Real Eiffel Engineering & Laboratory Services Geotechnical-Calibration-Laboratory Services www.realeiffel.com/
[email protected]
Confirmation Letter
Dear Engr Qahir Tahiryan
I hereby stated that this Letter will serve as confirmation of our quotation which was submitted on 1-Jan-2019 for engineering laboratory tests. For 12-Feb-2019 our quotation will be the same.
Name and status: E-mail:
[email protected]
Date and signature: Stamp:
Ahmad Khalid Ahmadi
12-Feb-2019
(Lab Manager)