LAPORAN TUGAS METODE PERBAIKAN DAN PERKUATAN STRUKTUR BAJA
Dosen Pengampu : Afif Navir Refani, ST. MT.
Disusun Oleh : Kelas A-2015 Basdian Kurniadi
10111510000048
DEPARTEMEN TEKNIK INFRASTRUKTUR SIPIL FAKULTAS VOKASI INSTITUT TEKNOLOGI SEPULUH NOPEMBER SURABAYA 2018
DAFTAR ISI DAFTAR ISI........................................................................................................... i DAFTAR GAMBAR .............................................................................................. i DAFTAR TABEL .................................................................................................. i BAB 1 RENCANA ANGGARAN BIAYA .................................................... 1 1.1. Rencana Anggaran Biaya ......................................................................... 1 BAB 2 DETAIL PERKUATAN STRUKTUR ............................................. 2 2.1. Perkuatan Kolom ...................................................................................... 2 2.2. Perkuatan Balok ....................................................................................... 2 LAMPIRAN ........................................................................................................... 3
DAFTAR GAMBAR Gambar 2.1 Perkuatan kolom baja terbungkus beton ............................................. 2 Gambar 2.2 Perkuatan balok dengan modifikasi profil .......................................... 2
DAFTAR TABEL Tabel 1.1 Rencana Anggaran Biaya Perkuatan Struktur......................................... 1
i
BAB 1 RENCANA ANGGARAN BIAYA 1.1.
Rencana Anggaran Biaya
Berikut merupakan rencana anggaran biaya mengenai pekerjaan pelaksanaan perkuatan bangunan : Tabel 1.1 Rencana Anggaran Biaya Perkuatan Struktur No A1
Uraian
Volume
Satuan
Harga Satuan (Rp)
Pekerjaan Persiapan
1
Administrasi dan Dokumentasi
2
Bouwplank / pagar pengaman lokasi
3
Gudang material
4 5
1
Rp5,000,000
Rp5,000,000
m' (titik)
Rp111,393
Rp2,784,825
6
m²
Rp352,350
Rp2,114,100
Listrik kerja dan air kerja
1
L³
Rp3,000,000
Rp3,000,000
Mobilisasi dan demobilisasi
1
L³
Rp5,000,000
Rp5,000,000
25
L³
Total A1 : A2
Jumlah
Rp17,898,925
Struktur Rangka Baja Perkuatan Balok
1
Balok T (½WF) 100x150x13x8
1301
kg
Rp15,000
Rp19,515,000
2
Pelat Baja 282x15
4250
kg
Rp15,000
Rp63,750,000
3
Pekerjaan Pengelasan Dengan Las Listrik
500
cm
Rp3,568
Rp1,784,000
4
Scaffolding Lebar 1,9 meter/set
15
buah/set
Rp535,000
Rp8,025,000
5
Finishing (pengecatan besi)
50
m²
Rp45,688
Rp2,284,400
Total A2 : A3 1
Struktur Kolom Komposit Beton K-300 untuk Concrete Jacketing Kolom (Jayamix)
2
Shear Connector D 19
3
Tulangan Longitudinal D16
4
Tulangan Sengkang Ø10
5 6
14.08 792
m³ buah
Rp95,358,400
Rp905,000
Rp12,742,400
Rp12,000
Rp9,504,000
833.36
kg
Rp9,800
Rp8,166,928
501
kg
Rp9,000
Rp4,509,000
Bekisting Kolom
20
m²
Rp407,630
Rp8,152,600
Finishing
20
m²
Rp525,000
Rp10,500,000
Total A3 :
Rp53,574,928
PPN 10%
Rp16,683,225
Jumlah Total :
Rp183,515,478
1
BAB 2 DETAIL PERKUATAN STRUKTUR 2.1.
Perkuatan Kolom
Perkuatan kolom dilakukan dengan membungkus baja profil dengan beton atau biasa disebut concrete encasement sehingga menjadi elemen komposit. Berikut adalah data spesifikasi beton yang akan digunakan sebagai perkuatan: 1. Dimensi kolom = 400/400 mm 2. Mutu beton, f’c = 25 MPa 3. Mutu baja tulangan longitudinal, fy = 400 MPa 4. Mutu baja tulangan sengkang, fy = 240 MPa 5. Tebal selimut = 40 mm 6. Tulangan longitudinal = 12 D 16 7. Tulangan sengkang = D10-150
Gambar 2.1 Perkuatan kolom baja terbungkus beton
Detail dan gambar perencanaan terlampir 2.2.
Perkuatan Balok
Perkuatan balok dilakukan dengan memodifikasi profil dengan memasang plat baja pada sayap kiri dan kanan profil, juga dengan menambahkan setengah profil WF di bawah penampang. 1. Plat baja : 282 mm x 15 mm 2. ½ WF : 150 x 150 x 12 x 15
Gambar 2.2 Perkuatan balok dengan modifikasi profil
Detail dan gambar perencanaan terlampir
2
LAMPIRAN
3