DAFTAR SUMBER DATA D A E R A H
: :
SEWA
P E R A L A T AN
PASARAN BEBAS KOTA SEMARANG & SEKITAR
HARGA NO.
PERALATAN
SATUAN
MINIMUM (Rp)
1
Dump Truck 3 ton
jam
140,000
2
Dump Truck 5 ton
jam
165,000
3
Truk Bak Terbuka
Jam
110,000
4
Truk Tanki Air
Jam
110,000
5
Bulldozer
Jam
180,000
6
Motor Grader
Jam
225,000
7
Wheel Loader
Jam
200,000
8
Excavator
Jam
200,000
9
Crane 30 ton
hari
6,500,000
10
Flat Bed Truck
jam
80,000
11
Baby Roller / Pedestrian
Jam
100,000
12
P.Tire Roller 8 - 10 ton
Jam
70,000
13
Baby Roller
jam
150,000
14
Vibrator Roller self 7 ton
Jam
50,000
15
Vibrator Roller Ped 1 ton
jam
87,500
16
Water Pump 30m3/hari
Jam
30,000
17
Asphalt Sprayer
Jam
30,000
18
Pick Up
hari
250,000
19
AM P
Jam
60,000
20
Asphalt Finisher
Jam
85,000
21
Concrete Vibrator
Jam
30,000
22
Compressor
Jam
30,000
23
Concrete Mixer 0,125m3
Jam
30,000
24
Concrete Mixer 0,5m3
jam
40,000
25
Stamper
Jam
25,000
26
Genset
Jam
30,000
27
Alat Pengecat Marka
Jam
45,000
28
Mesin Las
jam
45,000
29
Stone Crusher
jam
60,000
AFTAR
SEWA
P E R A L A T AN
KOTA SEMARANG & SEKITAR HARGA MAKSIMUM (Rp)
150,000 180,000 125,000 120,000 200,000 250,000 225,000 220,000 7,000,000 100,000 120,000 100,000 175,000 60,000 90,000 35,000 40,000 300,000 70,000 90,000 40,000 40,000 40,000 50,000 30,000 30,000 55,000 55,000 70,000
KET.
DAFTAR
UPAH PEKERJA
PEKERJAAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT
Lokasi : Jalan Estetika Raya No.1 Tembalang, Semarang HARGA NO.
URAIAN PEKERJA
SATUAN
(Rp)
1 Pekerja
Hr
57,000
2 Mandor
Hr
78,000
3 Tukang listrik
Hr
84,000
4 Tukang kayu
Hr
84,000
5 Kep. tk. kayu
Hr
87,000
6 Tukang batu
Hr
84,000
7 Kep. tk. batu
Hr
87,000
8 Tukang besi
Hr
78,000
9 Kep. tk. besi
Hr
87,000
10 T u k a n g c a t
Hr
82,000
11 K e p . t k . c a t
Hr
82,000
12 T u k a n g p l i t u r
Hr
82,000
13 T u k a n g j a l a n
Hr
61,000
14 T u k a n g g a l i
Hr
64,000
15 Tukang masak aspal
Hr
57,000
16 T k . l e i d e n g
Hr
76,000
17 M a s i n i s
Hr
162,000
18 P e m b . M a s i n i s
Hr
102,000
19 P e n j a g a a p i
Hr
57,000
20 P e n j a g a m a l a m
Hr
58,000
21 Sopir
Hr
162,000
22 Pembantu Sopir
Hr
102,000
414275883.xlsx
432
KET.
daftar upah tenaga kerja
DAFTAR
HARGA
SATUAN BAHAN
BANGUNAN
PEKERJAAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT Lokasi : Jalan Estetika Raya No.1 Tembalang, Semarang
HARGA NO.
I
J E N I S
BAHAN 1 BATU KALI
2 KERIKIL
B A H A N
SAT
(Rp)
DASAR Bulat Utuh
m3
167,000
Bulat Belah
m3
177,000
Pecah
10/15
m3
198,000
Pecah
5/7
m3
215,000
Pecah
3/5
m3
235,000
Timbun
m3
122,000
Sawur / Koral
m3
235,000
Beton
0,5/1
m3
252,000
Beton
,1/2
m3
280,000
Beton
,2/3
m3
270,000
Biasa
m3
127,000
Tras Giling
m3
220,000
3 BATU BATA
ex lokal
bh
520
4 PASIR
Urug
m3
130,000
Pasang
m3
210,000
Beton
m3
280,000
Padas
m3
105,000
Liat
m3
112,000
Pasang
m3
270,000
Semen Merah
m3
177,000
Holcim 40 kg
zak
53,000
Holcim 50 kg
zak
68,000
Cibinong 40 kg
zak
55,000
Cibinong 50 kg
zak
69,000
Semen Putih 40 kg
zak
67,000
5 TANAH
6 KAPUR
7 PORTLAND CEMENT
HARGA NO.
II
J E N I S
B A H A N
SAT
(Rp)
Semen Putih 50 kg
zak
92,000
Semen warna
kg
9,000
(100 lbr)
pak
187,000
2 GENTENG BETON Genteng Beton Warna standard
bh
6,000
Genteng Beton Warna Special
bh
9,500
Genteng Beton Warna Khusus
bh
14,500
Kerpus Beton Warna Standard
bh
9,000
Kerpus Beton Warna Special
bh
11,500
Kerpus Beton Warna Khusus
bh
13,000
BAHAN
1 SIRAP
PENUTUP ATAP
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
3 GENTENG TANAH LIAT Vlaam
bh
1,700
Kodok
bh
1,800
Kodok Glasur
bh
4,100
Nok kerpus Kodok
bh
6,600
Nok kerpus Kodok Glasur
bh
8,200
Plentong super besar 18 bh/m2
bh
5,200
Nok kerpus plentong super
bh
9,000
Vlaam tebal 2 mm
bh
11,000
Vlaam tebal 3 mm
bh
13,000
Kodok tebal 2 mm
bh
11,000
Kodok tebal 3 mm
bh
14,000
. 200 cm X 102 cm X 5 mm
bh
82,000
. 225 cm X 102 cm X 5 mm
bh
95,000
. 250 cm X 102 cm X 5 mm
bh
97,000
. 200 cm X 102 cm X 6 mm
bh
85,000
. 225 cm X 102 cm X 6 mm
bh
92,000
. 250 cm X 102 cm X 6 mm
bh
106,000
. 150 cm X 105 cm X 4 mm
bh
43,000
. 180 cm X 105 cm X 4 mm
bh
52,000
. 210 cm X 105 cm X 4 mm
bh
62,000
. 240 cm X 105 cm X 4 mm
bh
69,000
. 270 cm X 105 cm X 4 mm
bh
80,000
. 300 cm X 105 cm X 4 mm
bh
87,000
ONDULINE : 95 cm x 200cm x 0.3mm
lbr
140,000
ONDUVILLA : 40cm x 106 cm x 0,3mm
lbr
75,000
bh
30,000
4 GENTENG KACA
5 ASBES GELOMBANG BESAR
Asbes Gelombang Kecil
NOK
Jabes nok . Kerpus Genteng
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
. Stel Besar
bh
47,000
. Paten Besar
bh
44,000
. Stel Besar
bh
45,000
. Patent Besar
bh
28,000
. Plat besar
bh
52,000
lbr
100,000
. 100cm X 100 cm X 3 mm
bh
16,000
. 100cm X 100 cm X 4 mm
bh
18,000
. 50 cm X 200 cm X 3 mm
bh
14,000
. 40 cm X 200 cm X 3 mm
bh
13,000
Nokstel gelombang harflex
NOK UNT ONDULINE & ONDUVILLA Ukuran 50cm x 50 cm x 0,3mm 6 ASBES PLAT
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
FIBER PLAT
uk. 100cm x 100cm x 4mm
lbr
25,000
unt Plafond
uk. 120cm x 240cm x 4mm
lbr
66,000
uk. 122cm x 244cm x 4mm
lbr
68,000
uk.122cm x 244cm x 5mm
lbr
100,000
uk.122cm x 244cm x 6mm
lbr
125,000
uk.122cm x 244cm x 8mm
lbr
185,000
uk.122cm x 244cm x 10mm
lbr
245,000
180 X 92 cm
bh
50,000
200 X 92 cm
bh
60,000
250 X 92 cm
bh
65,000
180 X 105 cm
bh
75,000
210 X 105 cm
bh
75,000
250 X 105 cm
bh
100,000
BJLS 0,18 lebar 55 cm
m'
15,000
BJLS 0,20 lebar 55 cm
m'
26,000
BJLS 0,28 lebar 55 cm
m'
26,000
BJLS 0,30 lebar 55 cm
m'
28,000
BJLS 0,18 panjang 180 cm
lbr
47,000
BJLS 0,20 panjang 180 cm
lbr
50,000
BJLS 0,30 panjang 180 cm
lbr
55,000
BJLS 0,40 panjang 180 cm
lbr
73,000
Papan
m3
22,000,000
Balok/pesagen
m3
20,000,000
Papan
m3
7,600,000
Balok/pesagen
m3
7,000,000
Papan
m3
6,000,000
Balok/pesagen
m3
5,500,000
Papan
m3
4,900,000
GRC BOARD
7 FIBRE GLASS (JABES)
8 SENG PLAT
9 SENG GELOMBANG
III . B A H A N K A Y U 1 JATI
2 KAMPER
3 KRUING
4 MERANTI
HARGA NO.
J E N I S
5 LANAN
6 BENGKIRAI
7 DOLKEN
B A H A N
SAT
(Rp)
Balok/pesagen
m3
4,500,000
Papan
m3
2,100,000
Balok/pesagen
m3
2,000,000
Papan
m3
9,800,000
Balok/pesagen
m3
9,500,000
Sedang 8 x 10 x 400 cm
bt
18,000
Kecil 6 x 7 x 400 cm
bt
16,000
Besar 10 x 12 x 400 cm
bt
29,000
Kayu cetakan
m3
1,900,000
Kayu bakar
m3
155,000
Bambu
bt
10,000
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
IV . BAHAN PENUTUP DINDING / LANTAI 1 UBIN (TEGEL BIASA) PC polos
30 X 30 cm
m2
34,000
20 X 20 cm
m2
32,000
30 X 30 cm
m2
45,000
20 X 20 cm
m2
40,000
30 X 30 cm
m2
53,000
PC warna
10 X 20 cm
bh
5,300
PC abu-abu
15 x 20
bh
5,200
Lantai/badan
m'
Plint
m'
Trap
m'
11 X 11 putih
dos
42,500
11 X 11 warna
dos
46,000
15 X 15 putih
dos
47,000
15 X 15 warna
dos
49,000
10 X 20 cm
m2
49,000
15 X 15 cm
m2
50,000
20 X 20 cm
m2
50,000
20 X 25 cm
m2
53,000
30 X 30 cm
m2
53,000
20 X 20 cm
m2
54,000
33 x 33 cm
m2
53,000
25 x 25 cm
m2
52,000
15 x 20 cm
m2
53,000
PC warna
Teraso 2 TEGEL PLINT
3 POLIS UBIN
4 UBIN PORSELIN Lokal
Lokal
5 MOZAIK PORSELIN
6 Keramik
2,250
HARGA NO.
J E N I S
SAT
(Rp)
7 Parquet Jati
m2
200,000
8 Batu Paros
m2
95,000
9 Batu Tempel Hitam
m2
98,000
40 x 40 cm
m2
230,000
30 x 30 cm
m2
270,000
m2
475,000
10 cm - 100 cm
bh
30,000
Ø 20 cm - 100 cm
bh
35,000
Ø 30 cm - 100 cm
bh
42,500
Ø 50 cm - 100 cm
bh
80,000
Ø 60 cm - 100 cm
bh
105,000
Ø 70 cm - 100 cm
bh
130,000
10 GRANITO
11
B A H A N
Marmer
V.BAHAN CETAK 1 BUIS BETON
Ø
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
U 10 cm - 100 cm
bh
21,000
U 15 cm - 100 cm
bh
27,000
U 20 cm - 100 cm
bh
35,000
U 30 cm - 100 cm
bh
40,000
U 50 cm - 100 cm
bh
2 LUBANG ANGIN (ROSTER) PC + PASIR 10 X 20 cm
bh
5,700
20 X 20 cm
bh
6,500
25 X 25 cm
bh
7,000
30 X 30 cm
bh
7,500
15 X 25 cm
bh
7,500
15 X 30 cm
bh
7,700
besi beton polos
kg
10,000
besi beton prestress
kg
16,500
besi beton ulir
kg
12,500
2 BESI PLAT
Besi Strip
kg
12,500
3 BESI PROFIL
Besi Profil
kg
13,000
VI . B A H A N B E S I 1 BESI BETON
a
b
c
BAJA RINGAN GALVALUME
lebar : 7,5cm tebal : 1mm
btg
125,000
type CT 75
lebar : 7,5cm tebal : 0.75mm
btg
85,000
lebar : 7,5cm tebal : 0,65mm
btg
80,000
type RT 12
tinggi : 3,5 cm, tebal : 0,45mm
btg
45,000
type RT 10
tinggi : 3,0 cm, tebal : 0,45mm
btg
40,000
tinggi 2 cm; tebal : 0,4mm
btg
25,000
tinggi 4 cm; tebal : 0,4 mm
btg
30,000
HOLLOW GALVANIS LIPAT
4 JARING - JARING BAJA Diameter
4 - 15
kg
15,000
Diameter
6 - 15
kg
15,000
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
Kawat Bronjong
kg
9,500
40 X 40 X 4
btg
135,000
L 50 X 50 X 5
btg
210,000
L 60 X 60 X 6
btg
300,000
6 KAWAT - Ikat beton/bendrat
kg
15,000
- Harmonika 12 X 45 mm
m2
22,000
- Harmonika 12 X 24 mm
m2
22,000
- Harmonika 14 X 30 mm
m2
23,000
- Harmonika 14 X 35 mm
m2
20,000
- Kawat Nyamuk Nylon
m2
9,000
- Kawat Kasa
m2
14,000
- Saringan pasir
m2
14,000
- Kawat loket
m2
15,000
- Kawat duri
rol
115,000
- Kawat bronjong
kg
20,000
5 BESI SIKU
L
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
VII . B A H A N P I P A 1 Pipa PVC SII SCJ , S - 12,5 (10 bar) Pipa PVC DN 20 ( ½" ) AW JIS
btg
27,000
Pipa PVC DN 25 ( ¾" ) AW JIS
btg
33,000
Pipa PVC DN 32 ( 1" ) AW JIS
btg
45,000
Pipa PVC DN 40 ( 1½" )
btg
65,000
Pipa PVC DN 63 ( 2" )
btg
110,000
Pipa PVC DN 90 ( 3" )
btg
200,000
Pipa PVC DN 110 ( 4" )
btg
300,000
Pipa PVC DN 160 ( 6" )
btg
625,000
Pipa PVC DN 200 ( 8" )
btg
1,000,000
Pipa PVC DN 250 ( 10" )
btg
1,400,000
Pipa PVC DN 315 ( 12" )
btg
2,050,000
Pipa Medium B Galvanis DN ½"
btg
67,000
Pipa Medium B Galvanis DN 25 ( ¾" )
btg
80,000
Pipa Medium B Galvanis DN 32 ( 1" )
btg
97,000
Pipa Medium B Galvanis DN 50 ( 1½" )
btg
140,000
Pipa Medium B Galvanis DN 63 ( 2" )
btg
170,000
Pipa Medium B Galvanis DN 2½"
btg
250,000
Pipa Medium B Galvanis DN 90 ( 3" )
btg
470,000
Pipa Medium B Galvanis DN 110 ( 4" )
btg
560,000
Pipa Medium B Galvanis DN 160 ( 6" )
btg
-
Pipa Medium B Galvanis DN 200 ( 8" )
btg
-
Pipa Medium B Galvanis DN 250 ( 10")
btg
-
30 X 30
lbr
5,600
30 X 60
lbr
13,500
60 X 120
lbr
41,000
3 Pipa Medium B Galvanis - SII
VIII . B A H A N L A N G I T - L A N G I T 1 AKUSTIK-uk :
HARGA NO.
J E N I S
B A H A N
List Kayu Profil
SAT
(Rp)
m'
4,800
lbr
65,500
lbr
69,000
uk.120cmx240cmx9mm
lbr
57,500
90 X 210
X 3 mm
lbr
52,000
. 120 X 240
X 3 mm
lbr
87,000
. 90 X 210
X 4 mm
lbr
66,000
. 90 X 210
X 9 mm
lbr
117,000
. 90 X 210
X 12 mm
lbr
165,000
. 90 X 210
X 15 mm
lbr
230,000
. 90 X 210
X 18 mm
lbr
300,000
2 SOFT BOARD-uk:
4'X 8'
Gypsum tebal 9 mm 3 HARD BOARD-uk: 4'X 8' GYPROC 4 PLY WOOD Teak wood
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
Tripleks . 120 X 240
X 3 mm
lbr
53,000
. 120 X 240
X 4 mm
lbr
63,000
. 120 X 240
X 6 mm
lbr
76,000
. 120 X 240
X 9 mm
lbr
115,000
. 120 X 240
X 12 mm
lbr
147,000
. 120 X 240
X 15 mm
lbr
192,000
. 120 X 240
X 18 mm
lbr
215,000
lbr
70,000
Menie
kg
28,000
Dempul plamur
kg
28,000
Ambril/amplas
lbr
3,900
Batu Apung
kg
29,000
Cat dasar
kg
35,000
. Emco
kg
52,000
. Yunior 66 (nippon paint)
kg
52,000
- Koas
bh
7,600
. Deculux
kg
56,000
. Siralax
ons
16,000
. Spiritus
ltr
12,000
. Plitur jadi
ltr
39,000
Kalkarium
kg
4,300
Kapur sirih
kg
4,300
Plamur
kg
21,000
Cat Tembok
kg
20,000
Sintex
5 kg
100,000
Danabride
5 kg
102,000
Multipleks
Formika ukuran pintu IX . B A H A N F I N I S H I N G 1 KAYU
2 TEMBOK
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
Catylac
5 kg
110,000
Mowilex
5 kg
280,000
3 BESI
-
Menie
kg
21,000
Cat mengkilat
kg
56,000
Cat
kg
37,000
Thinner A
ltr
15,000
Minyak cat
ltr
14,000
Thinner Super
ltr
19,000
drum
56,000
kapasitas 550 liter.
bh
880,000
kapasitas 1100 liter.
bh
1,655,000
Lem Aica Aibon
kg
38,000
Residu (teer/aspal) Fibre glass (tanki air)
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
X.BAHAN KACA 1 POLOS
2 ES KABUR
3 RAY BAND
3 mm
m2
61,000
5 mm
m2
72,000
3 mm
m2
72,000
5 mm
m2
81,000
3 mm
m2
71,000
5 mm
m2
82,000
XI . BAHAN INSTALASI LISTRIK
1 KABEL LISTRIK N YA : .
1 X 1 1/2
mm2
m'
3,100
SPLN LMK
1 X 2 1/2
mm2
m'
3,700
1X4
mm2
m'
5,800
1X6
mm2
m'
8,600
NYY :.
2 X 1 1/2
mm2
m'
9,250
PRIMA
2 X 2 1/2
mm2
m'
15,000
2X4
mm2
m'
27,000
2X6
mm2
m'
35,500
3 X 1 1/2
mm2
m'
13,200
3 X 2 1/2
mm2
m'
20,000
3X4
mm2
m'
34,500
3X6
mm2
m'
51,000
NYM :.
2 X 1 1/2
mm2
m'
7,000
PRIMA
2 X 2 1/2
mm2
m'
11,000
2X4
mm2
m'
21,500
3 X 1 1/2
mm2
m'
12,700
3 X 2 1/2
mm2
m'
19,500
3X4
mm2
m'
31,000
3X6
mm2
m'
44,000
.
.
.
2 SKAKELAR
HARGA NO.
J E N I S
Out bauw .
B A H A N
SAT
(Rp)
Seri
bh
16,000
Engkel
bh
10,000
Seri
bh
14,000
Engkel
bh
11,000
1 group
bh
120,000
2 group
bh
225,000
3 group
bh
340,000
. In bauw . .
3 FUSE BOX (SEKERING KASA)
4 STEKER -
Biasa
bh
11,000
Arde
bh
15,500
T Biasa
bh
12,500
T dengan Arde
bh
17,000
HARGA NO.
J E N I S
5 FITING
B A H A N
SAT
(Rp)
Flaon
bh
9,000
Gantung
bh
17,000
Kap
bh
12,000
Kombinasi
bh
315,000
bh
13,500
Arde Outbow hitam
bh
5,500
Arde IB
bh
13,000
Arde Putar
bh
37,500
1 X slag
bh
58,000
2 X slag
bh
67,500
1 X slag
bh
88,000
2 X slag
bh
150,000
1 X slag
bh
58,000
2 X slag
bh
73,000
Engsel Angin
bh
15,500
Kupu-kupu biasa
bh
4,500
Nylon kupu-kupu
bh
8,000
bh
42,500
Grendel Tanam luar negeri
bh
9,000
Grendel biasa
bh
16,000
Kait Angin
bh
12,500
Door Stop
bh
300,000
1 KLOSET DUDUK
bh
1,250,000
2 KLOSET JONGKOK
bh
135,000
3 WASTAFEL PEDESTAL
bh
1,100,000
6 STOP KONTAK - Arde Outbow putih
XII . ALAT - ALAT PENGUNCI & PENGGANTUNG 1 KUNCI TANAM
Union :
Yale :
Kuda :
2 ENGSEL DAN GERENDEL
Espagnoled -
dalam negeri
XIII . BAHAN SANITAIR
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
4 WASTAFEL MEJA OVAL
bh
870,000
5 WASTAFEL GANTUNG BULAT
bh
380,000
6 WASTAFEL GANTUNG SUDUT
bh
260,000
7 WASTAFEL GANTUNG SUDUT KECIL
bh
285,000
8 WASTAFEL BAK CUCI
bh
165,000
9 TEMPAT SABUN GANTUNG
bh
34,000
bh
23,000
10 TEMPAT SABUN TANAM
11 SEPTIC TANK (ETERNIT GRESIK) 5 Pemakai 500 liter
unit
10 Pemakai 1.000 liter
unit
-
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
12 LAIN - LAIN Kran Air
bh
28,000
Seal tape
bh
4,000
Floor drain
bh
18,000
1 PAKU - ukuran 1" s/d 4"
kg
14,000
2 PAKU - payung
kg
26,000
3 PAKU - sekrup
kg
7,500
4 PAKU - beton
kg
28,000
5 MUR BAUT (kuda-kuda)
kg
13,500
6 ANGKUR BAUT
bh
13,500
7 LEM KAYU
bh
19,500
8 Tali Ijuk
kg
8,000
bh
295,000
XIV . ALAT PENGIKAT KAYU
XV . POMPA AIR. 1 POMPA AIR TANGAN Dragon buatan Indonesia 2 POMPA AIR LISTRIK Sanyo
100 watt
bh
995,000
Fuji
250 watt
bh
1,455,000
. 100 watt
bh
490,000
. 90 watt
bh
375,000
. 125 watt
bh
390,000
. 175 watt
bh
430,000
Abu-abu
m2
55,000
Merah/hitam
m2
63,000
Abu-abu
m2
58,000
Merah/hitam
m2
65,000
Abu-abu
m2
50,000
Shimizu
Dab
X VI . PAVING BLOCK 1 SQUARE
2 HOLLAND
3 UNIDECOR
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
Merah/hitam
m2
63,000
Abu-abu
m2
63,000
Merah/hitam
m2
67,000
Abu-abu
m2
63,500
Merah/hitam
m2
66,000
6 OLYMPIA HEXA
Abu-abu
m2
58,500
7 HEXAGONAL
Abu-abu
m2
65,000
Merah/hitam
m2
57,500
8 CASTLE
Abu-abu
m2
64,000
9 TRAPEZ
Abu-abu
m2
58,000
m2
62,000
11 STANDARD GRASS BLOCK ABU-ABU
BH
8,000
12 BATACO
BH
4,000
13 KANSTEEN
m'
24,000
4 UNI
5 TRIHEX
10 TRAPEZ GRASS BLOCK Abu-abu
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
XVII. L A I N - L A I N 1 KREI 25 MM
m2
48,000
2 Sliding Pintu J4
bh
210,000
3 Naco per Daun
bh
12,500
4 Rolling door Besi
m2
320,000
m2
260,000
5 Awning Almunium
m2
217,000
6 Kusen Almunium 4" Putih
m'
83,000
btg
1,548,000
drum
1,690,000
Rolling door Almunium
7 WIDE FLANGE BEAM 150 X 75 X 5 X 7 X 12
8 ASPAL. Aspal Ex Pertamina isi Net 160 kg
Hotmix Tebal = 4 Cm
m2
68,000
Hotmix Tebal = 5 Cm
m2
83,000
Hotmix Tebal = 6 Cm
m2
98,000
Hotmix Tebal = 7 Cm
m2
115,000
Binder Course
ton
1,325,000
Wearing Course
ton
1,425,000
Hot Roller Sheet
ton
1,200,000
Sand Sheet
ton
1,550,000
Sand Sheet Emulsi
ton
1,800,000
Cold Mix
ton
1,820,000
Prime / Tack Coard RC
liter
8,600
Prime Coat MC
liter
8,500
Prime / Tack Coat Emulsi
liter
8,600
m2
265,000
Pagar BRC 90 A2
/lb
185,000
Pagar BRC 120 A2
/lb
240,000
10 K A C A Cermin tebal 5 mm
11 PAGAR BRC.
HARGA NO.
J E N I S
B A H A N
SAT
(Rp)
12 LAIN-LAIN Minyak Beton & bekisting
ltr
9,700
Pintu Lipat Besi
m2
410,000
Sunscreen Allumunim
m2
335,000
Allumunium Foil
m2
7,700
Soda api
kg
12,500
Sabun
kg
12,500
Air
m3
18,000
Koas Alang-alang
ikat
1,700
Solar (Industri)
ltr
11,300
Premium (Industri)
ltr
10,700
Pelumas
ltr
42,500
Vynil 30x30 cm
bh
6,400
UNAN
NGKAT
KET
KET
KET
KET
KET
KET
KET
KET
KET
panj : 6 m panj : 6 m panj : 6 m panj : 6 m panj : 6 m
panj : 4 m panj : 4 m
KET
KET
panjang 4 m panjang 4 m panjang 4 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m
panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m
KET
KET
KET
KET
KET
KET
KET
KET
KET
KET
KET
Perhitungan Human Resources Mengambil Minggu ke 11 yang memiliki volume pekerjaan terbanyak dalam pelaksanaan proyek No.
Jenis Pekerjaan
1 Air kerja dan listrik 2 Administrasi dan Dokumentasi 3 Pemasangan Dinding Bata Merah Uk (5x11x22)cm T 1/2 Bata Camp. 1pc : 6pp 4 Pemasangan Plesteran 1Pc : 3pp t=15 mm 5 Pemasangan Plesteran 1Pc : 6pp t=15mm 6 Pembuatan dan Pemasangan Kusen Pintu dan Jendela kelas I 7 Pelaburan Bidang Kayu dg Politur 8 Pemasangan Dinding Bata Merah Uk (5x11x22)cm T 1/2 Bata Camp. 1pc : 6pp 9 Pemasangan Plesteran 1Pc : 6pp t=15mm 10 Pembuatan dan Pemasangan Kusen Pintu dan Jendela kelas I 11 Membuat Kolom Beton Bertulang 12 Pemasangan Pipa PVC tipe AW Ø ½"
ls ls
Volume Total 1.00 1.00
Volume/ Minggu 0.050 0.050
Bobot Total 0.124 20.000
Bobot/ Minggu 0.006 1.000
2
m2
280.00
140.000
1.675
0.838
1 2
m2 m2
27.00 344.00
27.000 172.000
0.175 2.058
0.175 1.029
2
m3
0.29
0.146
0.969
0.485
2
m2
16.65
8.326
0.084
0.042
2
m2
260.00
130.000
1.556
0.778
2
m2
290.25
145.125
1.273
0.636
3
m3
0.82
0.274
2.734
0.911
2 1
m3 m1
4.88 50
2.440 50
4.868 0.273
2.434 0.273396
Durasi
Satuan
20 20
RENCANA ANGGARAN BIAYA (RAB) KEGIATAN : PEMBANGUNAN BANGUNAN RUMAH TINGGAL PEKERJAAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT Lokasi : Jalan Estetika Raya No.1 Tembalang, Semarang JENIS PEKERJAAN
VOL.
SAT. HARGA SAT.PEK
JUMLAH
2 3 4 5 6 7 8
A. LANTAI 1 PEKERJAAN PERSIAPAN Pagar Sementara dari Seng Gelombang Tinggi 2,00 m Pengukuran dan Pemasangan Bouwplank Pembuatan Kantor Sementara dg Lantai Plesteran Pembuatan Gudang Semen dan Alat-alat Membersihkan Lapangan dan Perataan Air kerja dan listrik Papan Nama Proyek Administrasi dan Dokumentasi
1.000 ls 70.000 m' 9.000 m2 1.000 ls 200.000 m2 1.000 ls 1.000 ls 1.000 ls
II 1 2 3 4 5 6
PEKERJAAN TANAH Menggali Tanah Biasa Sedalam 1 m Pengurugan Kembali Menggali Tanah Biasa Sedalam 2 m Pengurugan Kembali Urugan Pasir Bawah Pondasi Urugan Pasir Bawah Lantai lt 1
122.097 40.699 44.064 14.688 6.750 11.355
III 1 2
PEKERJAAN PONDASI Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP Pemasang Batu Kosong/Anstamping
IV 1
PEKERJAAN DINDING Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
20.250
m2
Rp
52,338 Rp
1,059,853
2
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
280.000 m2
Rp
48,236 Rp
13,506,034
jumlah
Rp
14,565,887
V 1 2 3
PEKERJAAN PLESTERAN Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm Pemasangan Acian
Rp Rp Rp jumlah
52,338 Rp 48,236 Rp 28,457 Rp Rp
1,413,137 16,593,128 10,557,547 28,563,811
VI 1 2
PEKERJAAN KUSEN KAYU Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II
0.291 m3 Rp 26,851,000 Rp 708,373 Rp 16.360 m3 Rp jumlah Rp
7,814,285 11,588,974 19,403,260
VII 1 2 3 4 5 6 7
PEKERJAAN BETON Membuat Lantai Kerja Beton Mutu K(100) Membuat Beton Mutu K(250) Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting) Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) Membuat Balok Beton Bertulang (200 kg Besi + Bekisting) Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)
I
Rp 10,000,000 Rp 136,004 Rp 1,810,859 Rp 1,702,008 Rp 10,560 Rp 1,000,000 Rp 300,000 Rp 1,500,000 jumlah
Rp Rp Rp Rp Rp Rp Rp Rp Rp
10,000,000 9,520,280 16,297,727 1,702,008 2,112,000 1,000,000 300,000 1,500,000 42,432,015
m3 m3 m3 m3 m3 m3
Rp 49,170 Rp Rp 49,170 Rp Rp 60,291 Rp Rp 60,291 Rp Rp 191,268 Rp Rp 191,268 Rp jumlah Rp
6,003,509 2,001,170 2,656,663 885,554 1,291,059 2,171,848 15,009,803
42.590 m3 18.360 m3
Rp 686,890 Rp Rp 415,157 Rp jumlah Rp
29,254,624 7,622,273 36,876,897
27.000 m2 344.000 m2 371.000 m2
0.450 13.060 8.127 4.725 9.805 3.695 1.643
m3 m3 m3 m3 m3 m3 m3
Rp 866,589 Rp 4,659,540 Rp 3,769,209 Rp 4,608,610 Rp 8,040,786 Rp 6,321,926 Rp 5,815,112 jumlah
Rp Rp Rp Rp Rp Rp Rp Rp
389,965 60,851,722 30,632,836 21,775,680 78,839,902 23,359,515 9,551,321 225,400,940
VIII 1 2
PEKERJAAN LANGIT-LANGIT Langit-langit Gypsum Board & Rangka Allumunium (Concealed) List Gypsum
IX 1 2 3 4 5 6 7 8
PEKERJAAN SANITASI Memasang Closet Duduk / Mono Blok Memasang Wastafel + Kran Pemasangan Floor Drain Memasang Soap Holder Memasang Paper Holder Memasang Shower dan Kran Memasang Kran Air Memasang Pompa Air (Sanyo)
X 1 2 3
PEKERJAAN PLUMBING Pemasangan Pipa PVC tipe AW Ø ½" Pemasangan Pipa PVC tipe AW Ø 4" Septictank + peresapan
XI 1
PEKERJAAN BESI DAN ALUMUNIUM Memasang Railling Tangga
XII 1 2 3 4 5 6 7
PEKERJAAN KUNCI DAN KACA Memasang Kunci Tanam Memasang Engsel Pintu dan Jendela Pasang Kait Angin lt1 Pasang Grendel Pasang Pull Handle Pasang Handle Biasa Pasang Kaca tebal 5 mm lt1
XIII 1 2 3 4
PEKERJAAN PENUTUP LANTAI DAN DINDING Pemasangan lantai Ubin Granito Uk. 40 x 40 cm Pemasangan Lantai Keramik 20 x 20 cm Pemasangan Dinding Keramik 20 x 25cm Pemasangan dinding marmer 20x40
XIV 1 2 3
PEKERJAAN PENGECATAN Pelaburan Bidang Kayu dg Politur Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar Pengecatan Plafond
XV 1 2 3 4 5 6 7
PEKERJAAN INSTALASI LISTRIK Lampu Spiral Kuning ( Teras ) Lampu LED ( Dipasang Dalam Plafond ) Saklar Tunggal Saklar Ganda Stop Kontak Instalasi Titik Lampu Kabel NYA
51.100 m2 Rp 113.000 m' Rp jumlah
4,905,307 2,314,805 7,220,112
Rp 1,779,874 Rp 666,259 Rp 31,053 Rp 75,000 Rp 80,000 Rp 200,000 Rp 72,655 Rp 995,000 jumlah
Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,559,747 666,259 62,106 150,000 80,000 200,000 145,310 995,000 5,858,422
44,079 50.000 m' Rp m' Rp 44,079 50.000 1,200,000 1.000 Unit Rp jumlah
Rp Rp Rp Rp
2,203,942 2,203,942 1,200,000 5,607,883
29,758 Rp Rp
6,695,494 6,695,494
2.000 1.000 2.000 2.000 1.000 1.000 2.000 1.000
Unit Unit bh bh bh bh bh Unit
95,994 Rp 20,485 Rp Rp
225.000 m'
Rp jumlah
4.000 44.000 1.000 27.000 6.000 2.000 32.021
bh bh bh bh bh bh m2
Rp 176,152 Rp Rp 9,000 Rp Rp 30,672 Rp Rp 3,000 Rp Rp 87,000 Rp Rp 90,000 Rp Rp 90,110 Rp jumlah Rp
704,606 396,000 30,672 81,000 522,000 180,000 2,885,424 4,799,702
100.500 7.500 24.000 15.050
m2 m2 m2 m2
Rp 347,075 Rp Rp 57,815 Rp Rp 200,654 Rp Rp 350,000 Rp jumlah Rp
34,881,068 433,615 4,815,703 5,267,500 45,397,886
16.651 m2 Rp 371.000 m2 Rp 51.100 m2 Rp jumlah 3.000 15.000 1.000 7.000 4.000 12.000 50.000
bh bh bh bh bh bh m1
Rp Rp Rp Rp Rp Rp Rp jumlah
40,814 Rp 17,286 Rp 17,286 Rp Rp
679,602 6,412,924 883,290 7,975,815
34,000 98,000 10,000 16,000 13,500 13,500 3,700
102,000 1,470,000 10,000 112,000 54,000 162,000 185,000 2,095,000
Rp Rp Rp Rp Rp Rp Rp Rp
XVI 1
B. LANTAI 2 PEKERJAAN TANAH Urugan pasir bawah lantai 2
XVII
PEKERJAAN DINDING
10.883 m3
Rp 191,268 Rp jumlah Rp
2,081,570 2,081,570
1
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
20.250
m2
Rp
52,338 Rp
1,059,853
2
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
260.000 m2
Rp
48,236 Rp
12,541,317
jumlah
Rp
13,601,170
27.000 m2 Rp 196.000 m2 Rp 409.000 m2 Rp jumlah
48,236 Rp 52,338 Rp 28,457 Rp Rp
1,302,368 10,258,326 11,638,913 23,199,606
XVIII 1 2 3
PEKERJAAN PLESTERAN Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm Pemasangan Acian
XIX 1 2 3 4 5 6
PEKERJAAN KAYU Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I
XX 1 2
PEKERJAAN BETON Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) Membuat Ring Balok Beton Bertulang
XXI 1 2 3 4
PEKERJAAN PENUTUP ATAP Pemasangan Bubugan Genteng Beton Pemasangan Atap Genteng Beton Pemasangan Nok Genteng Beton Pasang Allumunium Foil / Sisalation
34.400 169.000 3.500 83.070
XXII 1 4
PEKERJAAN LANGIT-LANGIT Langit-langit Gypsum Board & Rangka Allumunium (Concealed) List Gypsum
51.350 m2 122.800 m1
XXIII 1 2 3 5
PEKERJAAN SANITASI Memasang Closet Duduk / Mono Blok Pemasangan Floor Drain Memasang Soap Holder Memasang Shower dan Kran
XXIV 1 2 3
PEKERJAAN PLUMBING Pemasangan Pipa PVC tipe AW Ø ½" Pemasangan Pipa PVC tipe AW Ø 4" Memasang rRoof Tank 1000 L
XXV 4 6
PEKERJAAN BESI DAN ALUMUNIUM Pemasangan Ralling Balkon 5 x 5 Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm
m3 m2 m1 m2 Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Klas I 0.87744 m3 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II 36.900 m1 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II Pemasangan konstruksi Gording, Kayu Klas II Pemasangan Rangka Atap Genteng Beton, Kayu Klas II
0.821 18.080 2.880 169.000
Rp Rp Rp Rp Rp Rp Rp
22,041,234 12,807,375 199,427 31,093,634 25,613,281 4,421,469 96,176,419
4.880 m3 2.160 m3
Rp 8,040,786 Rp Rp 6,321,926 Rp jumlah Rp
39,239,033 13,655,359 52,894,392
m1 m2 m1 m2
Rp 93,291 Rp Rp 104,606 Rp Rp 106,159 Rp Rp 24,083 Rp jumlah Rp
3,209,210 17,678,346 371,556 2,000,608 23,259,721
Rp Rp jumlah
95,994 Rp 20,485 Rp Rp
4,929,306 2,515,558 7,444,864
Rp 1,779,874 Rp 31,053 Rp 80,000 Rp 200,000 jumlah
Rp Rp Rp Rp Rp
3,559,747 62,106 160,000 400,000 4,181,853
50.000 m' Rp 44,079 60.000 m' Rp 44,079 Unit 1.000 Rp 1,600,000 jumlah
Rp Rp Rp Rp
2,203,942 2,644,730 1,600,000 6,448,672
Rp 112,641 Rp Rp 172,717 Rp jumlah Rp
1,126,410 4,697,889 5,824,299
2.000 2.000 2.000 2.000
Unit bh bh bh
Rp 26,851,000 Rp 708,373 Rp 69,245 Rp 183,986 Rp 29,190,920 Rp 119,823 jumlah
10.000 m' 27.200 m'
XXVI 1 2 3 4 5 6
PEKERJAAN KUNCI DAN KACA Memasang Kunci Tanam Memasang Engsel Pintu dan Jendela Pasang Grendel Pasang Pull Handle Pasang Handle Biasa Kaca tebal 3 mm
XXVII PEKERJAAN PENUTUP LANTAI DAN DINDING LT2 Pemasangan lantai Ubin Granito Uk. 40 x 40 cm 1 Pemasangan Lantai Keramik 20 x 20 cm 3 Pemasangan Dinding Keramik 20 x 25cm 4 Pemasangan dinding marmer 20x40 5 XXVIII PEKERJAAN PENGECATAN LT2 Pelaburan Bidang Kayu dg Politur 1 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Pengecatan Plafond 3 XXIX 1 2 3 4 5 6 7
PEKERJAAN INSTALASI LISTRIK LT2 Lampu LED ( Dipasang Dalam Plafond ) Lampu spiral kuning ( teras ) Saklar Tunggal Saklar Ganda Stop Kontak Instalasi Titik Lampu Kabel NYA
XXX 1 2 3
PEKERJAAN LAIN-LAIN Penangkal Petir Penyambungan daya ke PLN 2200 VA Landscape
TOTAL
4.000 27.000 13.000 2.000 5.000 19.686
bh bh bh bh bh m2
Rp 176,152 Rp Rp 9,000 Rp Rp 3,000 Rp Rp 87,000 Rp Rp 90,000 Rp Rp 90,110 Rp jumlah Rp
704,606 243,000 39,000 174,000 450,000 1,773,912 3,384,518
76.500 7.500 24.000 22.000
m2 m2 m2 m2
Rp 347,075 Rp Rp 57,815 Rp Rp 200,654 Rp Rp 350,000 Rp jumlah Rp
26,551,260 433,615 4,815,703 7,700,000 39,500,579
18.901 m2 409.000 m2 51.350 m2
Rp Rp Rp jumlah
40,814 Rp 17,286 Rp 17,286 Rp Rp
10.000 1.000 3.000 4.000 4.000 11.000 50.000
bh bh bh bh bh bh m'
Rp Rp Rp Rp Rp Rp Rp jumlah
34,000 98,000 10,000 16,000 13,500 13,500 3,700
Rp Rp Rp Rp Rp Rp Rp Rp
340,000 98,000 30,000 64,000 54,000 148,500 185,000 919,500
2.000 1.000 1.000
ls ls ls
Rp 250,000 Rp 1,000,000 Rp 50,000,000 jumlah
Rp Rp Rp Rp
500,000 1,000,000 50,000,000 51,500,000
771,428 7,069,774 887,611 8,728,812
Rp807,048,901
JUMLAH
Rp Rp Rp Rp Rp Rp Rp Rp Rp
10,000,000 9,520,280 16,297,727 1,702,008 2,112,000 1,000,000 300,000 1,500,000 42,432,015
Rp Rp Rp Rp Rp Rp Rp
6,003,509 2,001,170 2,656,663 885,554 1,291,059 2,171,848 15,009,803
Rp Rp Rp
29,254,624 7,622,273 36,876,897
Rp
1,059,853
Rp
13,506,034
Rp
14,565,887
Rp Rp Rp Rp
1,413,137 16,593,128 10,557,547 28,563,811
Rp Rp Rp
7,814,285 11,588,974 19,403,260
Rp Rp Rp Rp Rp Rp Rp Rp
389,965 60,851,722 30,632,836 21,775,680 78,839,902 23,359,515 9,551,321 225,400,940
Rp Rp Rp
4,905,307 2,314,805 7,220,112
Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,559,747 666,259 62,106 150,000 80,000 200,000 145,310 995,000 5,858,422
Rp Rp Rp Rp
2,203,942 2,203,942 1,200,000 5,607,883
Rp Rp
6,695,494 6,695,494
Rp Rp Rp Rp Rp Rp Rp Rp
704,606 396,000 30,672 81,000 522,000 180,000 2,885,424 4,799,702
Rp Rp Rp Rp Rp
34,881,068 433,615 4,815,703 5,267,500 45,397,886
Rp Rp Rp Rp
679,602 6,412,924 883,290 7,975,815
Rp Rp Rp Rp Rp Rp Rp Rp
102,000 1,470,000 10,000 112,000 54,000 162,000 185,000 2,095,000
Rp Rp
2,081,570 2,081,570
Rp
1,059,853
Rp
12,541,317
Rp
13,601,170
Rp Rp Rp Rp
1,302,368 10,258,326 11,638,913 23,199,606
Rp Rp Rp Rp Rp Rp Rp
22,041,234 12,807,375 199,427 31,093,634 25,613,281 4,421,469 96,176,419
Rp Rp Rp
39,239,033 13,655,359 52,894,392
Rp Rp Rp Rp Rp
3,209,210 17,678,346 371,556 2,000,608 23,259,721
Rp Rp Rp
4,929,306 2,515,558 7,444,864
Rp Rp Rp Rp Rp
3,559,747 62,106 160,000 400,000 4,181,853
Rp Rp Rp Rp
2,203,942 2,644,730 1,600,000 6,448,672
Rp Rp Rp
1,126,410 4,697,889 5,824,299
Rp Rp Rp Rp Rp Rp Rp
704,606 243,000 39,000 174,000 450,000 1,773,912 3,384,518
Rp Rp Rp Rp Rp
26,551,260 433,615 4,815,703 7,700,000 39,500,579
Rp Rp Rp Rp
771,428 7,069,774 887,611 8,728,812
Rp Rp Rp Rp Rp Rp Rp Rp
340,000 98,000 30,000 64,000 54,000 148,500 185,000 919,500
Rp Rp Rp Rp
500,000 1,000,000 50,000,000 51,500,000
Rp807,048,901
REKAPITULASI KEGIATAN : PEMBANGUNAN BANGUNAN RUMAH TINGGAL PEKERJAAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT Lokasi : Jalan Estetika Raya No.1 Tembalang, Semarang NO
JENIS PEKERJAAN
HARGA
A. LANTAI 1 I II III IV V VI VII VIII IX X XI XII XIII XIV XV
PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PONDASI PEKERJAAN DINDING PEKERJAAN PLESTERAN PEKERJAAN KUSEN KAYU PEKERJAAN BETON PEKERJAAN LANGIT-LANGIT PEKERJAAN SANITASI PEKERJAAN PLUMBING PEKERJAAN BESI DAN ALUMUNIUM PEKERJAAN KUNCI DAN KACA PEKERJAAN PENUTUP LANTAI DAN DINDING PEKERJAAN PENGECATAN PEKERJAAN INSTALASI LISTRIK JUMLAH
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
42,432,015 15,009,803 36,876,897 14,565,887 28,563,811 19,403,260 225,400,940 7,220,112 5,858,422 5,607,883 6,695,494 4,799,702 45,397,886 7,975,815 2,095,000
Rp
467,902,927
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
2,081,570 13,601,170 23,199,606 96,176,419 52,894,392 23,259,721 7,444,864 4,181,853 6,448,672 5,824,299 3,384,518 39,500,579 8,728,812 919,500 51,500,000
Rp Rp
339,145,974 807,048,901
B. LANTAI 2 XVI XVII XVIII XIX XX XXI XXII XXIII XXIV XXV XXV XXVII XXVIII
PEKERJAAN TANAH PEKERJAAN DINDING PEKERJAAN PLESTERAN PEKERJAAN KAYU PEKERJAAN BETON PEKERJAAN PENUTUP ATAP PEKERJAAN LANGIT-LANGIT PEKERJAAN SANITASI PEKERJAAN PLUMBING PEKERJAAN BESI DAN ALUMUNIUM PEKERJAAN KUNCI DAN KACA PEKERJAAN PENUTUP LANTAI DAN DINDING LT2
PEKERJAAN PENGECATAN LT2 XXIX PEKERJAAN INSTALASI LISTRIK LT2 XXX PEKERJAAN LAIN-LAIN JUMLAH JUMLAH TOTAL
TERBILANG:
+ PPN 10% Rp 80,704,890.14 JUMLAH TOTAL Rp 887,753,791.55 DIBULATKAN RP Rp 887,750,000.00 Delapan Ratus Delapan Puluh Tujuh Juta Tujuh Ratus Lima Puluh Ribu Rupiah
Semarang, Oktober 2015 Perencana
Muhammad Nur Azzam
BILL OF QUANTITY KEGIATAN : PEMBANGUNAN BANGUNAN RUMAH & TOKO PEKERJAAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT Lokasi : Jalan Estetika Raya No.1 Tembalang, Semarang NO
KODE
JENIS PEKERJAAN
SATUAN
VOLUME
A. LANTAI 1 PEKERJAAN PERSIAPAN
I A.2.2.1.2 A.2.2.1.4 A.2.2.1.5 A.2.2.1.7 A.2.2.1.9 Taksir Taksir
Pagar Sementara dari Seng Gelombang Tinggi 2,00 m Pengukuran dan Pemasangan Bouwplank Pembuatan Kantor Sementara dg Lantai Plesteran Pembuatan Gudang Semen dan Alat-alat Membersihkan Lapangan dan Perataan Air kerja dan listrik Papan Nama Proyek
m' m' m2 ls m2 ls ls
30.000 70.000 9.000 1.000 200.000 1.000 1.000
II 1 2 3 4 5 6
A.2.3.1.1 A.2.3.1.9 A.2.3.1.2 A.2.3.1.9 A.2.3.1.11 A.2.3.1.11
PEKERJAAN TANAH Menggali Tanah Biasa Sedalam 1 m Pengurugan Kembali Menggali Tanah Biasa Sedalam 2 m Pengurugan Kembali Urugan Pasir Bawah Pondasi Urugan Pasir Bawah Lantai lt 1
m3 m3 m3 m3 m3 m3
122.097 40.699 44.064 14.688 6.750 11.355
III 1 2
A.3.2.1.7 A.3.2.1.9
PEKERJAAN PONDASI Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP Pemasang Batu Kosong/Anstamping
m3 m3
42.590 18.360
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
m2
20.250
2
A.4.4.1.11 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
m2
280.000
V 1 2 3
PEKERJAAN PLESTERAN A,4,4,2.3 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm A,4,4,2.6 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm A,4,4,2.27 Pemasangan Acian
m2 m2 m2
27.000 344.000 371.000
VI 1 2
A.4.6.1.1 A.4.6.1.5
Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II
m3 m3
0.291 16.360
PEKERJAAN BETON Membuat Lantai Kerja Beton Mutu K(100) Membuat Beton Mutu K(250) Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting) Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) Membuat Balok Beton Bertulang (200 kg Besi + Bekisting) Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)
m3 m3 m3 m3 m3 m3 m3
0.450 13.060 8.127 4.725 9.805 3.695 1.643
1 2 3 4 5 6 7
IV 1
VII 1 2 3 4 5 6 7
PEKERJAAN DINDING A.4.4.1.8
PEKERJAAN KUSEN KAYU
A.4.1.1.4
A.4.1.1.6 A.4.1.1.28 A.4.1.1.29 A.4.1.1.30 A.4.1.1.31 A.4.1.1.34
VIII 1 2
Hitung Hitung
PEKERJAAN LANGIT-LANGIT Langit-langit Gypsum Board & Rangka Allumunium (Concealed) List Gypsum
m2 m'
51.100 113.000
IX 1 2 3 4 5 6 7 8
A.5.1.1.1 A.5.1.1.5 A.5.1.1.14 Hitung Hitung Hitung A.5.1.1.19 Hitung
PEKERJAAN SANITASI Memasang Closet Duduk / Mono Blok Memasang Wastafel + Kran Pemasangan Floor Drain Memasang Soap Holder Memasang Paper Holder Memasang Shower dan Kran Memasang Kran Air Memasang Pompa Air (Sanyo)
Unit Unit bh bh bh bh bh Unit
2 1 2 2 1 1 2 1
X 1 2 3
PEKERJAAN PLUMBING A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø ½" A.5.1.1.31 Pemasangan Pipa PVC tipe AW Ø 4" Hitung Septictank + peresapan
m' m' Unit
50.000 50.000 1
XI 1
Hitung
PEKERJAAN BESI DAN ALUMUNIUM Memasang Railling Tangga
m'
225.000
XII 1 2 3 4 5 6 7
A.4.6.2.2 A.4.6.2.5 A.4.6.2.9 Hitung Hitung Hitung A.4.6.2.16
PEKERJAAN KUNCI DAN KACA Memasang Kunci Tanam Memasang Engsel Pintu dan Jendela Pasang Kait Angin lt1 Pasang Grendel Pasang Pull Handle Pasang Handle Biasa Pasang Kaca tebal 5 mm lt1
bh bh bh bh bh bh m2
4 44 1 27 6 2 32.021
XIII 1 2 3 4
A.4.4.3.9 A.4.4.3.36 A.4.4.3.50 Hitung
PEKERJAAN PENUTUP LANTAI DAN DINDING Pemasangan lantai Ubin Granito Uk. 40 x 40 cm Pemasangan Lantai Keramik 20 x 20 cm Pemasangan Dinding Keramik 20 x 25cm Pemasangan dinding marmer 20x40
m2 m2 m2 m2
100.500 7.500 24.000 15.050
XIV 1 2 3
PEKERJAAN PENGECATAN A.4.7.1.7 Pelaburan Bidang Kayu dg Politur A.4.7.1.10 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar A.4.7.1.10 Pengecatan Plafond
m2 m2 m2
16.651 371.000 51.100
PEKERJAAN INSTALASI LISTRIK Lampu Spiral Kuning ( Teras ) Lampu LED ( Dipasang Dalam Plafond ) Saklar Tunggal Saklar Ganda Stop Kontak Instalasi Titik Lampu Kabel NYA
bh bh bh bh bh bh m1
3 15 1 7 4 12 50
XV 1 2 3 4 5 6 7
Hitung Hitung Hitung Hitung Hitung Hitung Hitung
XVI 1
B. LANTAI 2 PEKERJAAN TANAH A.2.3.1.11 Urugan pasir bawah lantai 2
XVII 1
A.4.4.1.8
m3
10.883
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
m2
20.250
A.4.4.1.11 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
m2
260.000
XVIII 1 2 3
PEKERJAAN PLESTERAN A,4,4,2.3 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm A,4,4,2.6 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm A,4,4,2.27 Pemasangan Acian
m2 m2 m2
27.000 196.000 409.000
XIX 1 2 3 4 5 6
A.4.6.1.1 A.4.6.1.5 A.4.6.1.15 A.4.6.1.17 A.4.6.1.14 A.4.6.1.22
m3 m2 m1 m2 m3 m1
0.821 18.080 2.880 169.000 0.877 36.900
XX 1 2
PEKERJAAN BETON A.4.1.1.30 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) A.4.1.1.31 Membuat Ring Balok Beton Bertulang
m3 m3
4.880 2.160
XXI 1 2 3 4
A.4.5.2.6 A.4.5.2.30 A.4.5.2.34 A.4.5.2.42
PEKERJAAN PENUTUP ATAP Pemasangan Bubugan Genteng Beton Pemasangan Atap Genteng Beton Pemasangan Nok Genteng Beton Pasang Allumunium Foil / Sisalation
m1 m2 m1 m2
34.400 169.000 3.500 83.070
XXII 1 4
Hitung Hitung
PEKERJAAN LANGIT-LANGIT Langit-langit Gypsum Board & Rangka Allumunium (Concealed) List Gypsum
m2 m1
51.350 122.800
XXIII 1 2 3 5
A.5.1.1.1 A.5.1.1.14 Hitung Hitung
PEKERJAAN SANITASI Memasang Closet Duduk / Mono Blok Pemasangan Floor Drain Memasang Soap Holder Memasang Shower dan Kran
Unit bh bh bh
2.000 2.000 2.000 2.000
XXIV 1 2 3
PEKERJAAN PLUMBING A.4.7.1.12 Pemasangan Pipa PVC tipe AW Ø ½" A.4.7.1.13 Pemasangan Pipa PVC tipe AW Ø 4" Hitung Memasang Roof Tank
m' m' Unit
50.000 60.000 1.000
XXV 4 6
PEKERJAAN BESI DAN ALUMUNIUM A.4.2.1.11 Pemasangan Ralling Balkon 5 x 5 A.4.2.1.18 Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm
m' m'
10.000 27.200
2
PEKERJAAN DINDING
PEKERJAAN KAYU Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II Pemasangan konstruksi Gording, Kayu Klas II Pemasangan Rangka Atap Genteng Beton, Kayu Klas II Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Klas I Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II
XXVI 1 2 3 4 5 6
A.4.6.2.2 A.4.6.2.5 Hitung Hitung Hitung A.4.6.2.16
PEKERJAAN KUNCI DAN KACA Memasang Kunci Tanam Memasang Engsel Pintu dan Jendela Pasang Grendel Pasang Pull Handle Pasang Handle Biasa Kaca tebal 3 mm
bh bh bh bh bh m2
4.000 27.000 13.000 2.000 5.000 19.686
A.4.4.3.9 A.4.4.3.36 A.4.4.3.36 A.4.4.3.50 Hitung
PEKERJAAN PENUTUP LANTAI DAN DINDING LT2 Pemasangan lantai Ubin Granito Uk. 40 x 40 cm Pemasangan lantai teras Uk. 40 x 40 cm Pemasangan Lantai Keramik 20 x 20 cm Pemasangan Dinding Keramik 20 x 25cm Pemasangan dinding marmer 20x40
m2 m2 m2 m2 m2
76.500 10.500 7.500 24.000 22.000
XXVIII PEKERJAAN PENGECATAN LT2 1 A.4.7.1.7 Pelaburan Bidang Kayu dg Politur 2 A.4.7.1.10 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 3 A.4.7.1.10 Pengecatan Plafond
m2 m2 m2
18.901 409.000 51.350
XXIX 1 2 3 4 5 6 7
Hitung Hitung Hitung Hitung Hitung Hitung Hitung
PEKERJAAN INSTALASI LISTRIK LT2 Lampu LED ( Dipasang Dalam Plafond ) Lampu spiral kuning ( teras ) Saklar Tunggal Saklar Ganda Stop Kontak Instalasi Titik Lampu Kabel NYA
bh bh bh bh bh bh m'
10.000 1.000 3.000 4.000 4.000 11.000 50.000
Taksir Taksir Taksir
PEKERJAAN LAIN-LAIN Penangkal Petir Penyambungan daya ke PLN 2200 VA Landscape
ls ls ls
2.000 1.000 1.000
XXVII 1 2 3 4 5
XXX 1 2 3
VOLUME
30.000 70.000 9.000 1.000 200.000 1.000 1.000
122.097 40.699 44.064 14.688 6.750 11.355
42.590 18.360
20.250 280.000
27.000 344.000 371.000
0.291 16.360
0.450 13.060 8.127 4.725 9.805 3.695 1.643
51.100 113.000
2 1 2 2 1 1 2 1
50.000 50.000 1
225.000
4 44 1 27 6 2 32.021
100.500 7.500 24.000 15.050
16.651 371.000 51.100
3 15 1 7 4 12 50
10.883
20.250 260.000
27.000 196.000 409.000
0.821 18.080 2.880 169.000 0.877 36.900
4.880 2.160
34.400 169.000 3.500 83.070
51.350 122.800
2.000 2.000 2.000 2.000
50.000 60.000 1.000
10.000 27.200
4.000 27.000 13.000 2.000 5.000 19.686
76.500 10.500 7.500 24.000 22.000
18.901 409.000 51.350
10.000 1.000 3.000 4.000 4.000 11.000 50.000
2.000 1.000 1.000
PERHITUNGAN VOLUME PEKERJAAN NO
GAMBAR
PERHITUNGAN
LANTAI 1 I PEKERJAAN PERSIAPAN 1 Pembersihan Lahan Volume
= = =
Luas area 10 x 20 200 m2
2 Pemasangan pagar sementara
Volume
= =
Keliling area 30 m1
3 Pemasangan Bouwplank
Volume
= =
35.000 70
x m1
2
Volume
=
1.44
+
1
II PEKERJAAN TANAH 1 Galian Tanah Untuk Pondasi
2
Volume
=
90.585
=
0.9
m3
+
1.12
2 =
Volume
= = =
Total
= =
2 Galian Tanah Untuk Footplat
m3
29.997
p
x 5.05
l x
122.097
0.6 m
3
1.515 90.585
x
+
29.997 m3
Volume
= =
p
x 1.2
l x
x 1.2
=
44.064
m
= =
122.097 40.699
/ m3
3
3 Urugan Tanah Kembali Untuk Pondasi Volume
4 Urugan Tanah Kembali Untuk footplat Volume
= =
Volume
= =
44.064 14.688
/ m3
5 Urugan Pasir Bawah Pondasi
Volume
Volume
Total
1
x
0.1
6.75
m
= =
0.9 x 2.43
m
= =
0.6 x 0.303
m3
=
6.75
+
2.43 m3
x m3
1.2
=
3
0.1 3
0.1
9.48
6 Urugan Pasir Bawah Footplat Volume
= =
1.2 0.45
Volume
= = =
Lbangunan
7 Urugan Pasir Bawah Lantai x x m3
113.55 11.355
8 Urugan Pasir Carport Volume
= = =
Volume
= =
1.0 x 13.5
=
0.9
Lcarport 92.0 9.2 m3
III PEKERJAAN PONDASI 1 Pekerjaan pondasi batu kosong ( Aanstamping)
Volume
x
0.2 m
3
0.2
x x
Total
=
4.86
m3
=
13.5
+
=
18.36
4.86 m3
2 Pekerjaan pondasi batu belah Volume
=
0.8
+
0.3
2 =
Volume
m3
29.7
=
0.8
+
0.3
2 =
m3
11.88
Volume
= =
0.4 1.01
x m3
0.5
Total
=
29.7
+
11.88 m3
+
1.2
=
42.59
IV PEKERJAAN BETON 1 Footplat Volume
=
0.25 2 1.2
x =
Volume
0.25 x
2 Pedestal
m3
3.77
=
=
x
+ 2 1.2
2.82
1 x m3
Volume
Total
= = = = =
p
x
0.25 1.541
l x m3
x 0.25
3.77
+
2.82 m3
8.1
3 Lantai Kerja Volume
= =
1 0.45
x m3
0.05
Volume
= =
1 0.4
x m3
0.05
Total
=
0.45
+
= 5 Sloof Sloof 20 x 25
6 Kolom Kolom 25 x 25
Volume
Volume
b
= =
p
Volume
= = =
x
h x m3
x 0.25
0.25
l x
x 0.25
4.25
m3
0.2 4.725
=
Kolom 15 x 15
m
0.85
= = =
0.4 3
x
p
x 0.15 0.54
l x m3
x 0.15
Kolom Pagar Volume
= =
0.15 0.135
x m3
0.15
Total
=
8.5
+
1.17 m3
=
9.805
7 Balok Balok 20 x 25
Balok 15 x 20 (anak)
8 Tangga
Volume
Volume
Volume anak tangga
= = =
b
= =
b
= =
x
0.2 3.695
x
0.2 3.375
a
x 2 x
0.3
h x m3
x 0.25
h x m3
x 0.25
o
x
0.25 2
Volume tebal tangga
Total
=
0.563
m3
=
l
h
x
= =
1.00 1.08
x m3
0.12
=
0.563
+
1.08 m3
x x m2
t 4.00
x x
t 1.50
= PEKERJAAN DINDING 1 Pas. Dinding batu bata 1 : 6 ( 1/2 bata ) uk.5x11x22
2 Pas. Dinding batu bata 1 : 3 ( 1/2 bata ) uk.5x11x22 (Trasram Kelliling)
Volume
Volume
x
1.643
= = =
Ptotal
= =
Ptotal
70 280
13.5
Total
=
20.25
m2
=
280
+
= 3 Plesteran dinding tebal 15 mm 1 : 6
4 Plesteran dinding tebal 15 mm 1 : 3
5 Acian
Volume
Volume
Volume
300.25
= =
2
= =
2
= =
20.25 m2
x
172 m2
x 27
13.5 m2
344 371
+ m2
344
27.00
PAGAR 1 Pas. Dinding batu bata 1 : 6 ( 1/2 bata ) uk.5x11x22
Volume
= =
8 16
x m2
2.00
2 Plesteran dinding tebal 15 mm 1 : 6
Volume
= =
8 16
x m2
2.00
3 Acian
Volume
=
8 16
x m2
2.00
Volume
= = =
PEKERJAAN KUSEN 1 Kusen Pintu dan Jendela a. Desain Pintu dan Jendela
=
( 0.060 x 0.077 x jumlah 0.077 x 2 m3 0.155
b. Desain Pintu Garasi (P1) Volume
= = = =
( 0.060 x 0.047 x jumlah 0.047 x 1 m3 0.047
c. Desain P2 Volume
= = = =
( 0.060 x 0.035 x jumlah 0.035 x 1 m3 0.035
=
(
d. Desain Jendela J1 Volume
0.060
x
Total
= =
0.055 0.055
=
0.055
x jumlah x 1 3 m
=
0.155
+
=
0.291
0.047 m3
PEKERJAAN DAUN KUSEN 1 Kusen Pintu a. Desain Pintu Jendela 1 Volume
= = =
0.75 1.080 1.080
- 0.390 x jumlah x 2 2 m
=
2.160
= = =
1.2 2.360 2.360
=
9.440
- 0.610 x jumlah x 4 3 m
Total
=
11.600
m3
Volume
= = =
1 1.960 1.960
=
1.960
- 0.510 x jumlah x 1 2 m
= = =
1.6 2.800 2.800
=
2.800
= =
11.600
b. Desain Pintu Garasi P1
c. Desain Pintu P2 Volume
TOTAL
16.360
- 0.900 x jumlah x 1 2 m
+ m2
1.960
PEKERJAAN PENUTUP LANTAI DAN DINDING 1 Keramik Lantai Toko (Platinum) 50x50 Volume
=
42.000
m2
2 Keramik Lantai Rumah (Platinum) 40x40
Volume
=
58.5
m2
3 Keramik km/wc (Asia Tile) 20x20
Volume
=
7.5
m2
4 Keramik Dinding km/wc (Asia Tile) 20x25
Volume
=
24
m2
5 Keramik Dinding Marmer ( 20 x 40 )
Volume
=
15.05
m2
PEKERJAAN LANGIT LANGIT 1 Plafond Gypsumboard Rangka Hollow Lantai 1
Volume
=
51.1
m2
2 List Plafond Lantai 1
1 2 3 4 5 6 7
PEKERJAAN ELEKTRIKAL LISTRIK Lampu Spiral Kuning ( Teras ) Lampu LED ( Dipasang Dalam Plafond ) Saklar Tunggal Saklar Ganda Stop Kontak Instalasi Titik Lampu Kabel NYA
Volume
= =
Volume Volume Volume Volume Volume Volume Volume
= = = = = = =
2
x 56.500 113.000 m' 3 15 1 7 4 12 50
bh bh bh bh bh bh m'
PEKERJAAN SANITASI Memasang Kloset Duduk Memasang Westafel + Kran Memasang Floor Drain Memasang Soap Holder Memasang Paper Holder Memasang Shower dan Kran Memasang Kran Air Mesin pompa sanyo
2 1 2 2 1 1 2 1
bh bh bh bh bh bh bh bh
Volume =
50
m'
- Pipa Air kotor PVC Ø 4'' kotor
Volume =
50
m'
3 Septictank + peresapan
Volume =
1
unit
1 2 3 4 5 6 7 8
Volume Volume Volume Volume Volume Volume Volume Volume
= = = = = = = =
PEKERJAAN PLUMBING 1 Pemipaan Air Bersih Pengadaan & pemasangan pemipaan air bersih dari tandon air ke titik pelayanan, bahan PVC AW klas 10 K lengkap terpasang termasuk fitting galian, hanger, gantungan, dan bobokan. - Pipa Air bersih PVC Ø 1/2'' bersih 2 Pemipaan Air kotor Pengadaan dan pemasangan pemipaan air bekas Bahan PVC AW klas 10 K, lengkap terpasang, termasuk fitting, galian, hanger, gantungan, bobokan.
PEKERJAAN KUNCI DAN KACA 1 Handle Pintu Pull Handle
3 Engsel Pintu dan Jendela
4 Kunci Tanam Pull Handle
Biasa
PJ P1 P2 Total
= = = =
2 2
PJ P1 P2 P3 J3 Total
= = = = = =
12 12 3 3 2
PJ P1 Total P2
x x 6
2 1
= =
buah x x x x x
44
2 1 1 1 1 buah
= = =
1 x 1 x 3
2 = 1 = buah
=
1
x
1
= = = = =
=
5 Kaca tebal 5 mm Lantai 1
PEKERJAAN BESI DAN ALUMINIUM 1 Memasang Railling Tangga Besi Stainless 5 x 5
P3 Total
= =
PJ
=
0.390
x 2
P1
=
0.510
x 5
J1
=
3.270
x 3
Total
=
Volume
= =
1 x 2
1 = buah
13.14
7.5
x 225.000
m2
30 m1
PEKERJAAN FINISHING 1 Cat Dinding " Mowileks "
Volume
=
476
m2
2 Cat Plafond " Mowileks " 3 Cat Kusen " Mowileks "
Volume
= =
108 2
m2 11.862
=
23.724
m2
Volume
=
90
m1
Volume
= = =
L x 108.83 10.88
= = =
L x 108.83 13.06
h x
= =
1
x
0.15
m
Volume
x
PEKERJAAN LAIN-LAIN 1 Pekerjaan Lanscaping
LANTAI 2 1 Pekerjaan Urugan Pasir Bawah Lantai
h x
0.1 m3
PEKERJAAN BETON 1 Pelat Lantai Volume
0.12 m3
2 Topi-Topi Volume
3 Kolom
3
1.5
Kolom 25 x 25
4 Kolom 15 x 15
Volume
Volume
= = =
p
= = =
p
x 0.25
l x
4.25
m3
x 0.15
l x
0.63
m3
x 0.25
x 0.15
5 Ring Balok Ring Balok 15 x 20
PEKERJAAN DINDING 1 Pas. Dinding batu bata 1 : 6 ( 1/2 bata ) uk.5x11x22
2 Pas. Dinding batu bata 1 : 3 ( 1/2 bata ) uk.5x11x22 kamar mandi
3 Plesteran dinding tebal 15 mm 1 : 6
4 Plesteran dinding tebal 15 mm 1 : 3
5 Acian
6 Sponengan
Volume
Volume
Volume
Volume
Volume
Volume
Volume
= =
b 0.15
h x
2.16
m3
= = =
Ptotal 65
x x
260
m2
= = =
Ptotal 13.5
x x
20.25
m2
= =
2
= =
2
x
x 196
x 0.2
t 4.00
t 1.50
98 m2
x
13.5
27
m2
= =
364
+
409
m
= =
2
x
286
m2
45.000
2
142.90
PEKERJAAN KUSEN 1 Kusen Pintu dan Jendela a. Desain Pintu dan Jendela Volume
= = =
( 0.060 x 0.071 x jumlah 0.071 x 1
=
0.071
m3
c. Desain P2 Volume
= = =
( 0.060 x 0.035 x jumlah 0.035 x 4
=
0.141
m3
c. Desain Jendela J2 Volume
= = =
( 0.060 x 0.057 x jumlah 0.057 x 2
=
0.115
= = =
( 0.060 x 0.156 x jumlah 0.156 x 3
=
0.468
= = =
( 0.060 x 0.026 x jumlah 0.026 x 1
=
0.026
m3
d. Desain Jendela J3 Volume
m3
e. Desain Bouven (BV) Volume
TOTAL
= =
PEKERJAAN DAUN KUSEN 1 Kusen Pintu dan Jendela a. Desain Pintu Jendela 1
Volume
m3
0.071 + + 0.026 0.821
0.141 m3
= = =
0.75 1.080 1.080
=
2.160
- 0.390 x jumlah x 2 m2
= =
1.2 2.360
x
0.610 jumlah
=
2.360
=
4.720
x m3
2
Total
=
6.880
m3
Volume
= = =
1.6 2.800 2.800
=
5.600
- 0.900 x jumlah x 2 2 m
b. Desain Pintu P2
b. Desain Jendela J2 Volume
TOTAL
= = =
1.6 2.800 2.800
=
5.600
- 0.900 x jumlah x 2 2 m
= =
6.880
+
5.600
18.080
m3
PEKERJAAN PENUTUP LANTAI DAN DINDING 1 Keramik Lantai (Platinum) 40x40 Volume
=
76.500
m2
2 Keramik Lantai Teras) 40x40
Volume
=
10.500
m2
3 Keramik Dinding marmer 20x40
Volume
=
22.000
m2
4 Keramik km/wc (Asia Tile)20x20
Volume
=
7.5
m2
5 Keramik Dinding km/wc (Asia Tile) 20x25
Volume
=
24
m2
PEKERJAAN LANGIT LANGIT 1 Plafond Gypsumboard Rangka Hollow Lantai 1 2 List Plafond Lantai 1
Volume Volume
= = =
1 2 3 4 5 6 7
PEKERJAAN ELEKTRIKAL LISTRIK Lampu LED ( Dipasang Dalam Plafond ) Lampu spiral kuning ( teras ) Saklar Tunggal Saklar Ganda Stop Kontak Instalasi Titik Lampu Kabel NYA
Volume Volume Volume Volume Volume Volume Volume
= = = = = = =
10 1 3 4 4 11 50
bh bh bh bh bh bh m'
1 2 3 5
PEKERJAAN SANITASI Memasang Kloset Duduk Memasang Floor Drain Memasang Soap Holder Memasang Shower dan Kran
Volume Volume Volume Volume
= = = =
2 2 2 2
bh bh bh bh
PEKERJAAN PLUMBING 1 Pemipaan Air Bersih Pengadaan & pemasangan pemipaan air bersih dari tandon air ke titik pelayanan, bahan PVC AW klas 10 K lengkap terpasang termasuk fitting galian, hanger, gantungan, dan bobokan.
51.1 m2 2 x 56.500 113.000 m'
Volume =
50
m'
- Pipa Air kotor PVC Ø 3'' kotor
Volume =
60
m'
3 Memasang Roof Tank
Volume =
1
unit
- Pipa Air bersih PVC Ø 2'' bersih 2 Pemipaan Air kotor Pengadaan dan pemasangan pemipaan air bekas Bahan PVC AW klas 10 K, lengkap terpasang, termasuk fitting, galian, hanger, gantungan, bobokan.
PEKERJAAN KUNCI DAN KACA 1 Handle Pintu Pull Handle Biasa
2 Engsel Pintu
3 Kunci Tanam Pull Handle Biasa
PJ
=
2
P2 P3 Total
= = =
1 x 1 x 5
4 = 1 = buah
PJ P2 P3 Total
= = = =
12 x 3 x 3 x 27
1 = 4 = 1 = buah
PJ
=
1
P2 P3 Total
= = =
1 x 1 x 5
PJ P2 P3 Total
= = = =
8 1 1
PJ1
=
4.968
x 1
P3
=
0.998
x 1
J2
=
7.193
x 1
J4
=
2.822
x 1
BV
=
0.264
x 2
x
x
1
=
1
=
4 = 1 = buah
4 Grendel
5 Kaca tebal 5 mm
x x x 13
1 4 1
Total
=
15.981
PEKERJAAN KAYU 1 Lisplank 3/30
Volume
=
36.900
m'
2 Rangka Atap
Volume
=
169.0
m2
3 Talang Datar Seng BJLS
Volume
=
24.000
m'
4 Nok 8/12
Volume
=
8.000
m'
5 Reuter 2/20
Volume
=
8.000
m'
= = = buah
m2
KONSTRUKSI KUDA-KUDA 1 kuda-kuda bentang 7 meter
balok tarik 8/12 kaki kuda2 8/12 makelar 8/12 balok sokong 8/1 balok 4/12gapit
Total
2 Gording
3 Kerpus 4 Mur Baut
= = =
= =
0.0096 0.0096 0.0096 0.0096 0.0096
= =
0.219 0.219 0.877
Panjang = Volume = =
30 30
Panjang = vol =
32.6 200
x x x x x
x x kg m' x
2.880
0.096 m3
m' bh
PEKERJAAN PENUTUP ATAP 1 Pasang Bubugan Genteng Beton 2 Pasang Atap Genteng Beton
Volume
=
34.400
m1
Volume
=
169.00
m2
3 Alumunium Foil
Volume
=
27.20
m2
Volume
=
10.0
m1
1 Cat Dinding " Mowileks "
Volume
=
336.000
2 Cat Plafond " Mowileks " 3 Cat Kusen " Mowileks "
Volume Volume
= =
94.500 m2 2 x 12.706
=
25.411
m2
=
2
titik
PEKERJAAN BESI DAN ALUMINIUM 1 Memasang Railling Balkon Besi Stainless 5 x 5 PEKERJAAN FINISHING
PEKERJAAN LAIN-LAIN 1 Pekerjaan Penangkal Petir
Volume
m2
KERJAAN PERHITUNGAN
2
1 2
1.12 2
x
1.1
x
67.5
x
1.1
x
27
t 0.6
x
0.5
29.997
+
1.515
t 1.2
3
x x
jml 1.8
x
17
3
x
67.5
x
27
x
5.05
2.43
+
0.303
1.2
x
0.1
t 0.1
t 0.1
x
67.5
x
27
x
17
4.86
0.3
x
0.8
x
67.5
x
0.8
x
27
0.5
x
5.05
11.88
+
1.01
2
0.3 2
1.2 2
x 0.15 + 1.2 x
0.2
x 0.15 + 1.0 x
0.2
9
1 2 8
t 0.25
x x
jml 1.45
2.82
+
1.541
x
17
0.05
x
1
x
9
0.05
x
1
x
8
p 0.25
x
94.5
t 0.25
x x
jml 4
x
17
t 0.15
x x
jml 4
x
6
0.4
0.15
x
1.5
1.17
+
0.135
x
4
p 0.25
x
73.9
p 0.25
x
67.5
p
x
jmlh
x
1
x
x
9
p 0.12
1.08
4.00
1.50
15
20.25
27.00
2.00
2.00
2.00
0.120 jumlah 2
)
x
10.760
0.120 jumlah 1
)
x
6.500
0.120 jumlah 1
)
x
4.800
0.120
)
x
7.600
jumlah 1
0.047
+
0.035
+
0.055
0.390 jumlah 2
x
3
0.610 jumlah 4
x
4
0.510 jumlah 1
x
4
0.900 jumlah 1
x
4
1.960
+
2.800
4 buah 2 buah
24 12 3 3 2
buah buah buah buah buah
2 buah 1 buah
1 buah
1 buah
=
0.78
m2
=
2.55
m2
=
9.81
m2
0.1
0.12
1.5
x
0.1
t 0.25
x x
jml 4
x
17
t 0.15
x x
jml 4
x
7
p 0.2
x
72
4.00
1.50
45.000
142.90
0.120 jumlah
)
x
10.760
0.120 jumlah
)
x
4.800
0.120 jumlah
)
x
7.970
0.120 jumlah
)
x
21.670
0.120 jumlah
)
x
3.560
0.141
+
0.115
0.390 jumlah 2
x
3
0.610 jumlah
x
4
+
0.468
2
0.900 jumlah 2
x
4
0.900 jumlah 2
x
4
5.600
+
5.600
2 buah 4 buah 1 buah
12 buah 12 buah 3 buah
1 buah 4 buah 1 buah
8 buah 4 buah 1 buah buah =
4.968
m2
=
0.998
m2
=
7.193
m2
=
2.822
m2
=
0.528
m2
7.03 7.50 2.00 3.12 3.20
jumlah 4
0.096
= = = = =
0.067 0.072 0.019 0.030 0.031
Contoh Perhitungan Human Resources Pemasangan Plesteran 1 Pc : 5 Pp Volume Durasi Volume/Minggu
Tebal 15 mm = 105.60 m2 = 2.000 minggu = 52.800 m2
Melihat tabel abk 5-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga 1 Pekerja = 0.20 x 2 Tukang Batu = 0.10 x 3 Kepala Tukang = 0.01 x 4 Mandor = 0.01 x Bahan 1 sak portland semen 40 kg 1 Portland Cement (PC)
=
3.25
x
Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga 1 Pekerja = 10.56 : 2 Tukang Batu = 5.28 : 3 Kepala Tukang = 0.53 : 4 Mandor = 0.53 :
52.80 52.80 52.80 52.80
= = = =
10.56 5.28 0.53 0.53
52.80
=
172
6 6 6 6
= = = =
1.76 0.88 0.09 0.09
3
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP Volume Durasi Volume/Minggu
= = =
280 m2 2 minggu 140 m2
Melihat tabel abk 4-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga 1 Pekerja = 0.30 x 2 Tukang Batu = 0.1 x 3 Kepala Tukang = 0.01 x 4 Mandor = 0.015 x
140.00 140.00 140.00 140.00
= = = =
42.00 14.00 1.40 2.10
Bahan 1 sak portland semen 40 kg Bata Merah 5 x 11 x 22 1 Portland Cement (PC) Pasir Pasang
140.00 140.00 140.00
= = =
9800 1,165 6.86
6 6 6 6
= = = =
7.00 2.33 0.23 0.35
27.00 27.00 27.00
= = =
8.10 4.05 0.41
= = =
70 8.32 0.049
x x x
Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga 1 Pekerja = 42.00 : 2 Tukang Batu = 14.00 : 3 Kepala Tukang = 1.40 : 4 Mandor = 2.10 :
4
Pemasangan Plesteran 1Pc : 3pp t=15 mm Volume Durasi Volume/Minggu
= = =
27.00 m2 1 minggu 27 m2
Melihat tabel abk 5-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga 1 Pekerja = 0.3 x 2 Tukang Batu = 0.15 x 3 Kepala Tukang = 0.015 x
4 Mandor
=
0.015
x
Bahan 1 sak portland semen 40 kg 1 Portland Cement (PC) Pasir Pasang
= =
7.776 0.023
x x
Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga 1 Pekerja = 8.10 : 2 Tukang Batu = 4.05 : 3 Kepala Tukang = 0.41 : 4 Mandor = 0.41 :
27.00
=
0.41
27.00 27.00
= =
210.0 0.62
6 6 6 6
= = = =
1.35 0.68 0.07 0.07
5
Pemasangan Plesteran 1Pc:6pp t=15mm Volume Durasi Volume/Minggu
= = =
344.0 m2 2 minggu 172 m2
Melihat tabel abk 5-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga 1 Pekerja = 0.3 x 2 Tukang Batu = 0.15 x 3 Kepala Tukang = 0.015 x 4 Mandor = 0.015 x Bahan 1 sak portland semen 40 kg 1 Portland Cement (PC) Pasir Pasang
= =
4.42 0.03
x x
Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga 1 Pekerja = 51.6 : 2 Tukang Batu = 25.80 : 3 Kepala Tukang = 2.58 : 4 Mandor = 2.58 :
6
172.00 172.00 172.00 172.00
172.00 172.00
6 6 6 6
= = = =
51.60 25.80 2.58 2.58
= =
759.6 4.6
= = = =
8.60 4.30 0.43 0.43
Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I Volume Durasi Volume/Minggu
= = =
0.29 m3 2 minggu 0.145512 m3
Melihat tabel abk 6-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga Pekerja = 7.00 x Tukang Kayu = 21.00 x Kepala Tukang = 2.10 x Mandor = 0.35 x
0.146 0.146 0.146 0.146
= = = =
1.02 3.06 0.31 0.05
Bahan Kayu Klas I (Jati) , Balok Paku Biasa 2" - 5 " Lem Kayu
= = =
1.1 1.25 1
x x x
Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga Pekerja = 1.02 : Tukang Kayu = 3.06 : Kepala Tukang = 0.31 : Mandor = 0.05 :
0.146 0.146 0.146
= = =
0.16 0.18 0.15
6 6 6 6
= = = =
0.17 0.51 0.05 0.01
7
Pelaburan Bidang Kayu dg Politur Volume Durasi Volume/Minggu
= = =
16.65 m2 2 minggu 8.33 m2
Melihat tabel abk 14-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga Pekerja = 0.04 x Tukang kayu = 0.06 x Kepala Tukang = 0.016 x Mandor = 0.003 x
8.33 8.33 8.33 8.33
= = = =
0.33 0.50 0.13 0.02
Bahan Politur Politur Jadi Ampelas
8.33 8.33 8.33
= = =
1 3 16.65
6 6 6 6
= = = =
0.06 0.08 0.02 0.00
= = =
0.15 0.37 2.00
x x x
Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga Pekerja = 0.33 : Tukang kayu = 0.50 : Kepala Tukang = 0.13 : Mandor = 0.02 :
8
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP Volume Durasi Volume/Minggu
= = =
260.00 2 minggu 130.00 m2
Melihat tabel abk 4-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga Pekerja = 0.3 x Tukang Batu = 0.1 x Kepala Tukang = 0.01 x
130.00 130.00 130.00
= = =
39.00 13.00 1.30
Mandor
=
0.015
x
Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang
= = =
70 8.32 0.049
x x x
Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga Pekerja = 39.00 : Tukang Batu = 13.00 : Kepala Tukang = 1.30 : Mandor = 1.95 :
130.00
130.00 130.00 130.00
6 6 6 6
=
1.95
= = =
9100 1,082 6.4
= = = =
6.50 2.17 0.22 0.33
9
Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm Volume Durasi Volume/Minggu
= = =
196.00 2 minggu 98.00 m2
Melihat tabel abk 5-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga Pekerja = x 0.3 Tukang batu = x 0.15 Kepala Tukang = x 0.015 Mandor = x 0.015
98.00 98.00 98.00 98.00
= = = =
29.40 14.70 1.47 1.47
Bahan Portland Semen Pasir Pasang
98.00 98.00
= =
762.0 2.25
6 6 6 6
= = = =
4.90 2.45 0.25 0.25
= =
7.78 0.023
x x
Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga Pekerja = 29.4 : Tukang batu = 14.70 : Kepala Tukang = 1.47 : Mandor = 1.47 :
10
Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I Volume Durasi Volume/Minggu
= = =
0.82 m3 3 minggu 0.274 m3
Melihat tabel abk 6-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga Pekerja = 7.00 x Tukang Kayu = 21.00 x Kepala Tukang = 2.10 x Mandor = 0.35 x
0.274 0.274 0.274 0.274
= = = =
1.92 5.75 0.57 0.10
Bahan Kayu Klas I (Jati) , Balok Paku Biasa 2" - 5 "
0.274 0.274
= =
0.30 0.34
= =
1.1 1.25
x x
Lem Kayu
=
1
x
Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga Pekerja = 1.92 : Tukang Kayu = 5.75 : Kepala Tukang = 0.57 : Mandor = 0.10 :
0.274
=
0.27
6 6 6 6
= = = =
0.32 0.96 0.10 0.02
11
Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) Volume Durasi Volume/Minggu
= = =
4.88 m3 2 minggu 2.44 m3
Melihat tabel abk 7-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga Pekerja = 7.05 x Tukang batu = 0.275 x Tukang Kayu = 1.65 x Tukang Besi = 2.1 x Kepala Tukang = 0.403 x Mandor = 0.353 x Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Kerikil Beton Kayu Klas II Balok Plywood 9 mm Dolken diameter 8 / 4rm
= = = = = = = = = = =
0.4 4 2 315 4.5 336 0.54 0.81 0.15 3.5 20
x x x x x x x x x x x
Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga Pekerja = 17.20 : Tukang batu = 0.67 : Tukang Kayu = 4.03 : Tukang Besi = 5.12 : Kepala Tukang = 0.98 : Mandor = 0.86 :
12
Pemasangan Pipa PVC tipe AW Ø ½" Volume Durasi Volume/Minggu
= = =
2.44 2.44 2.44 2.44 2.44 2.44
50.00 m1 1 minggu 50.00 m1
2.44 2.44 2.44 2.44 2.44 2.44 2.44 2.44 2.44 2.44 2.44
6 6 6 6 6 6
= = = = = =
17.20 0.67 4.03 5.12 0.98 0.86
= = = = = = = = = = =
0.976 9.760 4.880 768.6 10.980 819.84 1.318 1.976 0.366 8.540 48.800
= = = = = =
2.87 0.112 0.671 0.854 0.164 0.14355333
Melihat tabel abk 10-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga Pekerja = 0.81 x Tukang Batu = 0.140 x Kepala Tukang = 2.80 x Mandor = 16.0 x
50.00 50.00 50.00 50.00
= = = =
40.50 7.00 140.00 800.00
50.00 50.00
= =
60 17.5
6 6 6 6
= = = =
6.75
Bahan Pipa PVC Ø ½" Perlengkapan 35% x pipa
= =
1.2 0.35
x x
Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga = 40.50 : Pekerja = 7.00 : Tukang Batu = 140.00 : Kepala Tukang = 800.00 : Mandor
1.17 23.33 133.33
orang orang orang orang
kg
= = = =
2 1 1 1
orang orang orang orang
Bata Camp. 1SP : 6PP
orang orang orang orang
kg m3
= = = =
orang orang orang
7 3 1 1
orang orang orang orang
orang
kg m3
= = = =
2 1 1 1
orang orang orang orang
orang orang orang orang
kg m3
= = = =
orang orang orang orang
=
18.99 sak
9 5 1 1
orang orang orang orang
m3 kg kg
= = = =
1 1 1 1
orang orang orang orang
orang orang orang orang
Ltr Ltr Lbr
= = = =
1 1 1 1
orang orang orang orang
Bata Camp. 1SP : 6PP
orang orang orang
orang
Buah Kg m3
= = = =
7 3 1 1
orang orang orang orang
orang orang orang orang
kg kg
= = = =
orang orang orang orang
m3 kg
5 orang 3 orang 1 orang 1 orang
kg
= = = =
1 1 1 1
orang orang orang orang
orang orang orang orang orang orang
m3 Kg Ltr kg kg Kg m3 m3 m3 Lbr Btg
= = = = = =
3 1 1 1 1 1
orang orang orang orang orang orang
orang orang orang orang
m' Ls
orang orang orang orang
Tabel Kebutuhan Tenaga Kerja di Minggu ke 11 dengan 6 hari kerja No. 1 2 3 4 5 6
Tenaga Kerja
Jumlah
Pekerja 39 Tukang Batu 13.20 Tukang Kayu 1.55 Tukang Besi 0.85 Kepala Tukang 1.57 Mandor 1.57 Total ( 1 Hari Kerja )
Anggaran Tenaga Kerja Rp2,280,000 Rp1,176,000 Rp168,000 Rp78,000 Rp174,000 Rp156,000 Rp4,032,000
Jumlah Pekerja 40 orang 14 orang 2 orang 1 orang 2 orang 2 orang 61
Rp24,192,000
Maka total anggaran untuk tenaga kerja selama 1 minggu =
Tabel Kebutuhan Bahan Bangunan di Minggu ke 11 No.
Bahan
1
Portland Cement ( PC )
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Bata Merah 5 x 11 x 22 Pasir Pasang Pasir Beton Kerikil Beton Kayu Klas I (Jati) , Balok Kayu Klas III (Terentang) Pipa PVC Ø ½" Dolken diameter 8 / 4rm Plywood 9 mm Minyak Bekisting Besi Beton Polos Kawat Beton Politur Lem Kayu Paku Biasa 2" - 5 " Air kerja dan listrik
Anggaran Untuk Bahan Bangunan
Jumlah kg / sak buah m3 m3 kg m3 kg 60 m' 48.80 btg 8.540 lbr 4.88 ltr 768.60 kg 10.98 kg 4.35 ltr 0.42 kg 10.28 kg 0.006 ls
4,797.79 120 18,900 18.495 1.318 1.976 0.461 0.98
Total
Total Anggaran yang dikeluarkan di minggu ke 11
Rp
6,360,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
9,828,000 3,883,950 368,928 553,392 9,220,992 172,752 405,000 878,400 999,180 47,336 7,686,000 164,700 169,491 8,173 143,975 6,202 40,896,471
Rp Rp Rp
24,192,000 40,896,471 65,088,471
Anggaran Biaya Minggu ke-11
= = =
bobot x 7.62% x Rp 65,088,471
6 hari kerja Anggaran Tenaga Kerja Rp2,280,000 Rp1,176,000 Rp168,000 Rp78,000 Rp174,000 Rp156,000 Rp4,032,000 Rp24,192,000
Anggaran Untuk Bahan Bangunan Rp
6,360,000
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
9,828,000 3,883,950 368,928 553,392 9,220,992 172,752 405,000 878,400 999,180 47,336 7,686,000 164,700 169,491 8,173 143,975 6,202 40,896,471
Rp Rp Rp
24,192,000 40,896,471 65,088,471
Anggaran Biaya (+PPN) Rp887,750,000
KE
P
NO
JENIS PEKERJAAN
VOL.
HARGA SATUAN
SAT.
BOBOT (%)
HARGA
A. LANTAI 1
I
PEKERJAAN PERSIAPAN
1
Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
2
Pengukuran dan Pemasangan Bouwplank
3
Pembuatan Kantor Sementara dg Lantai Plesteran
9.000 m2 Rp
4
Pembuatan Gudang Semen dan Alat-alat
1.000
5
Membersihkan Lapangan dan Perataan
6 7 8
II
PEKERJAAN TANAH
1
Menggali Tanah Biasa Sedalam 1 m
2
Pengurugan Kembali
3
Menggali Tanah Biasa Sedalam 2 m
4
Pengurugan Kembali
5
Urugan Pasir Bawah Pondasi
6
Urugan Pasir Bawah Lantai lt 1
III
PEKERJAAN PONDASI
1
Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP
2
Pemasang Batu Kosong/Anstamping
IV
PEKERJAAN DINDING
1
1.000
ls
Rp
70.000 m'
Rp
ls
200.000 m2
Rp Rp
Air kerja dan listrik
1.000
ls
Rp
Papan Nama Proyek
1.000
ls
Administrasi dan Dokumentasi
1.000
ls
10,000,000 Rp 136,004 Rp
10,000,000
1,810,859 Rp 1,702,008 Rp
16,297,727
10,560
9,520,280 1,702,008 Rp1,198,560 1,000,000
Rp
1,000,000 Rp 300,000 Rp
Rp
1,500,000 Rp
1,500,000
122.097 m3 40.699 m3
Rp
49,170 Rp 49,170 Rp
6,003,509
44.064 m3 14.688 m3
Rp
60,291 Rp 60,291 Rp
2,656,663
6.750 m3 11.355 m3
Rp
191,268 Rp 191,268 Rp
1,291,059
42.590 m3 18.360 m3
Rp
686,890 Rp 415,157 Rp
29,254,624
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
20.250 m2
Rp
1,059,853
2
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
280.000 m2
Rp
52,338 Rp 48,236 Rp
V
PEKERJAAN PLESTERAN
1
Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm
Rp
2
Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm
27.000 m2 344.000 m2
3
Pemasangan Acian
371.000 m2
VI
PEKERJAAN KUSEN KAYU
1
Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I
2
Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II
VII
Rp Rp Rp
Rp
300,000
2,001,170 885,554 2,171,848
7,622,273
13,506,034
Rp
52,338 Rp 48,236 Rp
16,593,128
Rp
28,457 Rp
10,557,547
0.291 m3 Rp 16.360 m3 Rp
26,851,000 Rp 708,373 Rp
7,814,285 11,588,974
0.450 m3 Rp 13.060 m3 Rp 8.127 m3 Rp
866,589 Rp
389,965
4,659,540 Rp
60,851,722
1,413,137
100.000
1.240 1.181 2.022 0.211 0.149 0.124 0.037 0.186 0.745 0.248 0.330 0.110 0.160 0.269 3.629 0.946 0.131 1.675 0.175 2.058 1.310 0.969 1.438
PEKERJAAN BETON
1
Membuat Lantai Kerja Beton Mutu K(100)
2
Membuat Pelat Lantai K-250 (200 kg Besi + Bekisting)
3
Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)
4
Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)
5
Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)
6
Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)
7
Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)
3,769,209 Rp
30,632,836
4.725 m3 Rp 9.805 m3 Rp
4,608,610 Rp
21,775,680
8,040,786 Rp
78,839,902
3.695 m3 Rp 1.643 m3 Rp
6,321,926 Rp
23,359,515
5,815,112 Rp
9,551,321
51.100 m2 Rp 113.000 m' Rp
95,994 Rp 20,485 Rp
4,905,307
2.000 Unit Rp 1.000 Unit Rp
1,779,874 Rp 666,259 Rp
3,559,747
31,053 Rp 75,000 Rp
62,106
0.048 80.000 7.549 3.800 2.701 9.780 2.898 1.185
VIII PEKERJAAN LANGIT-LANGIT 1
Langit-langit Gypsum Board & Rangka Allumunium (Concealed)
2
List Gypsum
IX
PEKERJAAN SANITASI
1
Memasang Closet Duduk / Mono Blok
2
Memasang Wastafel + Kran
3
Pemasangan Floor Drain
4
Memasang Soap Holder
5
Memasang Paper Holder
6
Memasang Shower dan Kran
7
Memasang Kran Air
8
Memasang Pompa Air (Sanyo)
2.000 bh 2.000 bh
Rp
1.000 bh 1.000 bh
Rp
Rp
2,314,805
666,259 150,000
Rp
80,000 Rp 200,000 Rp
2.000 bh Rp 1.000 Unit Rp
72,655 Rp 995,000 Rp
145,310
2,203,942
80,000 200,000 995,000
0.608 0.287 0.442 0.083 0.008 0.019 0.010 0.025 0.018 0.123
X
PEKERJAAN PLUMBING
1
Pemasangan Pipa PVC tipe AW Ø ½"
50.000
m'
Rp
2
Pemasangan Pipa PVC tipe AW Ø 4"
50.000
m'
Rp
44,079 Rp 44,079 Rp
3
Septictank + peresapan
1.000
Unit Rp
1,200,000 Rp
1,200,000
0.273 0.273 0.149
XI
PEKERJAAN BESI DAN ALUMUNIUM
1
Memasang Railling Tangga
XII
2,203,942
225.000 m'
Rp
29,758 Rp
6,695,494
0.831
4.000 bh 44.000 bh
Rp
176,152 Rp 9,000 Rp
704,606
0.087 0.049
PEKERJAAN KUNCI DAN KACA
1
Memasang Kunci Tanam
2
Memasang Engsel Pintu dan Jendela
Rp
396,000
60.000
3
Pasang Kait Angin lt1
4
Pasang Grendel
5
Pasang Pull Handle
6
Pasang Handle Biasa
7
Pasang Kaca tebal 5 mm lt1
XIII
PEKERJAAN PENUTUP LANTAI DAN DINDING
1
Pemasangan lantai Ubin Granito Uk. 40 x 40 cm
2
Pemasangan Lantai Keramik 20 x 20 cm
3
Pemasangan Dinding Keramik 20 x 25cm
4
Pemasangan dinding marmer 20x40
1.000 bh 27.000 bh
Rp
30,672 Rp 3,000 Rp
30,672
6.000 bh 2.000 bh
Rp
522,000
Rp
87,000 Rp 90,000 Rp
32.021 m2 Rp
90,110 Rp
2,885,424
100.500 m2 Rp 7.500 m2 Rp
347,075 Rp 57,815 Rp
34,881,068
24.000 m2 Rp 15.050 m2 Rp
200,654 Rp 350,000 Rp
4,815,703
16.651 m2 Rp 371.000 m2 Rp
40,814 Rp 17,286 Rp
679,602 6,412,924
51.100 m2 Rp
17,286 Rp
883,290
3.000 bh 15.000 bh
Rp
34,000 Rp 98,000 Rp
102,000
1.000 bh 7.000 bh
Rp Rp
Rp
81,000 180,000
433,615 5,267,500
0.004 0.010 60.000 0.065 0.022 0.358 4.327 0.054 0.597 0.653
XIV PEKERJAAN PENGECATAN 1
Pelaburan Bidang Kayu dg Politur
2
Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar
3
Pengecatan Plafond
XV
0.084 0.796 0.110
PEKERJAAN INSTALASI LISTRIK
1
Lampu Spiral Kuning ( Teras )
2
Lampu LED ( Dipasang Dalam Plafond )
3
Saklar Tunggal
4
Saklar Ganda
5
Stop Kontak
6
Instalasi Titik Lampu
4.000 bh 12.000 bh
7
Kabel NYA
Rp
13,500 Rp 13,500 Rp
162,000
50.000 m1 Rp
3,700 Rp
185,000
0.013 0.182 0.001 0.014 0.007 0.020 0.023
Rp Rp
10,000 Rp 16,000 Rp
1,470,000 10,000 112,000 54,000
B. LANTAI 2 XVI PEKERJAAN TANAH 1
Urugan pasir bawah lantai 2
10.883 m3
Rp
191,268 Rp
2,081,570
0.258
1,059,853
0.131 1.556
XVII PEKERJAAN DINDING 1
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
20.250 m2
Rp
2
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
260.000 m2
Rp
52,338 Rp 48,236 Rp 48,236 Rp 52,338 Rp
10,258,326
28,457 Rp
11,638,913
Rp
26,851,000 Rp
22,041,234
12,541,317
XVIII PEKERJAAN PLESTERAN 1
Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm
2
Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm
27.000 m2 Rp 196.000 m2 Rp
3
Pemasangan Acian
409.000 m2 Rp
XIX
PEKERJAAN KAYU
1
Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I
2
Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II
3
Pemasangan konstruksi Gording, Kayu Klas II
4
Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Klas I
5
Pemasangan Rangka Atap Genteng Beton, Kayu Klas II
6
Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II
XX
Rp
708,373 Rp
12,807,375
2.880 m1 0.877 m3
Rp
69,245 Rp
199,427
Rp
29,190,920 Rp
25,613,281
169.000 m2 36.900 m1
Rp
183,986 Rp
31,093,634
Rp
119,823 Rp
4,421,469
4.880 m3 Rp 2.160 m3 Rp
8,040,786 Rp
39,239,033
6,321,926 Rp
13,655,359
Rp
93,291 Rp
3,209,210
Rp
104,606 Rp
17,678,346
3.500 m1 83.070 m2
Rp
106,159 Rp
371,556
Rp
24,083 Rp
2,000,608
51.350 m2 122.800 m1
Rp
95,994 Rp
4,929,306
Rp
20,485 Rp
2,515,558
2.000 Unit Rp 2.000 bh Rp
1,779,874 Rp 31,053 Rp
3,559,747 160,000
0.162 1.273 1.444 40.000 2.734 1.589 0.025 3.177 3.857 0.548
PEKERJAAN BETON
1
Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)
2
Membuat Ring Balok Beton Bertulang
XXI
0.821 m3 18.080 m3
1,302,368
4.868 1.694
PEKERJAAN PENUTUP ATAP
1
Pemasangan Bubugan Genteng Beton
2
Pemasangan Atap Genteng Beton
3
Pemasangan Nok Genteng Beton
4
Pasang Allumunium Foil / Sisalation
34.400 m1 169.000 m2
0.398 2.193 0.046 0.248
XXII PEKERJAAN LANGIT-LANGIT 1
Langit-langit Gypsum Board & Rangka Allumunium (Concealed)
2
List Gypsum
0.611 0.312
XXIII PEKERJAAN SANITASI 1
Memasang Closet Duduk / Mono Blok
2
Pemasangan Floor Drain
3
Memasang Soap Holder
4
Memasang Shower dan Kran
62,106
2.000 bh 2.000 bh
Rp Rp
80,000 Rp 200,000 Rp
50.000 m' 60.000 m'
Rp
44,079 Rp
2,203,942
Rp
44,079 Rp
2,644,730
1.000 Unit Rp
1,600,000 Rp
1,600,000
400,000
0.442 0.008 0.020 0.050
XXIV PEKERJAAN PLUMBING 1
Pemasangan Pipa PVC tipe AW Ø ½"
2
Pemasangan Pipa PVC tipe AW Ø 4"
3
Memasang Roof Tank 1000 L
0.273 0.328 0.198
XXV PEKERJAAN BESI DAN ALUMUNIUM 1
Pemasangan Ralling Balkon 5 x 5
2
Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm
10.000 m' 27.200 m'
Rp
112,641 Rp
1,126,410
Rp
172,717 Rp
4,697,889
4.000 bh 27.000 bh
Rp
176,152 Rp
704,606
Rp
9,000 Rp
243,000
13.000 bh 2.000 bh
Rp
3,000 Rp
39,000
Rp
87,000 Rp
174,000
0.140 20.000 0.583
XXVI PEKERJAAN KUNCI DAN KACA 1
Memasang Kunci Tanam
2
Memasang Engsel Pintu dan Jendela
3
Pasang Grendel
4
Pasang Pull Handle
0.087 0.030 0.005 0.022
5
Pasang Handle Biasa
6
Kaca tebal 3 mm
5.000 bh 19.686 m2
Rp
90,000 Rp
450,000
Rp
90,110 Rp
1,773,912
76.500 m2 7.500 m2
Rp
347,075 Rp
26,551,260
Rp
57,815 Rp
433,615
24.000 m2 22.000 m2
Rp
200,654 Rp
4,815,703
Rp
350,000 Rp
7,700,000
18.901 m2 409.000 m2
Rp
40,814 Rp
771,428
Rp
17,286 Rp
7,069,774
51.350 m2
Rp
17,286 Rp
887,611
10.000 bh 1.000 bh
Rp
34,000 Rp
340,000
Rp
98,000 Rp
98,000
3.000 bh 4.000 bh
Rp
10,000 Rp
30,000
Rp
16,000 Rp
64,000
Rp
13,500 Rp
54,000
0.056 0.220
XXVII PEKERJAAN PENUTUP LANTAI DAN DINDING LT2 1
Pemasangan lantai Ubin Granito Uk. 40 x 40 cm
2
Pemasangan Lantai Keramik 20 x 20 cm
3
Pemasangan Dinding Keramik 20 x 25cm
4
Pemasangan dinding marmer 20x40
3.294 0.054 0.597 0.955
XXVIII PEKERJAAN PENGECATAN LT2 1
Pelaburan Bidang Kayu dg Politur
2
Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar
3
Pengecatan Plafond
0.096 0.877 0.110
XXIX PEKERJAAN INSTALASI LISTRIK LT2 1
Lampu LED ( Dipasang Dalam Plafond )
2
Lampu spiral kuning ( teras )
3
Saklar Tunggal
4
Saklar Ganda
5
Stop Kontak
6
Instalasi Titik Lampu
4.000 bh 11.000 bh
Rp
13,500 Rp
148,500
7
Kabel NYA
50.000 m'
Rp
3,700 Rp
185,000
2.000
ls
Rp
250,000 Rp
500,000
1.000
ls
Rp
1,000,000 Rp
1,000,000
1.000
ls
Rp
50,000,000 Rp
50,000,000
0.042 0.012 0.004 0.008 0.007 0.018 0.023
XXX PEKERJAAN LAIN-LAIN 1
Penangkal Petir
2
Penyambungan daya ke PLN 2200 VA
3
Landscape
PROSENTASE JUMLAH KOMULATIF
Rp 806,135,461.41
0.062 0.124 6.202 1000.000 1
TIME SCHEDULE KEGIATAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT PEKERJAAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT Lokasi : Jalan Estetika Raya No.1 Tembalang, Semarang DURASI minggu minggu 1 100.000
1 2 3 2 1 20 1 20 2 1 2 1 1 1 2 1
BULAN 1 minggu 2 minggu 3
minggu 4
minggu 5
BULAN 2 minggu 6 minggu 7
minggu 8
minggu 9
BULAN 3 minggu 10 minggu 11
1.240
0.006
0.590 0.674 0.106 0.149 0.006
0.009
0.009
0.590 0.674 0.106
0.674
0.006 0.037 0.009
0.006
0.006
0.006
0.006
0.006
0.006
0.006
0.006
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.372
0.372 0.248
0.165
0.165 0.110
0.160 0.269 1.814
1.814
0.946
1 2
0.131 0.838
1 2 2
0.175 1.029
2 3 80.000
1 2 2 2 2 2 1
0.485 0.479
0.485
0.479
0.048 1.900
1.900 1.351
1.351 4.890
3.774
3.774
1.449
1.449
4.890 1.185
2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
60.000
0.838
0.123 0.273 0.273 0.149
60.000
1 1 1 1 1 2 1 1 2 2 2 2
0.042
0.042
1 1 1 1 1 1 1
1 1 2
40.000
0.131 0.778
1 2 2 3 3 1 3 2 1
0.778
0.636
0.530 1.059
2 2
0.911 0.530
0.911
2.434
2.434
1.059
1 2 1 1 2 1 1 1 1 1 1 1 1
20.000
2 1 1 1 1 1
0.273 0.328
1 1 2 1 1 2 2 3 1
0.048
1 1 1 1 1 1 1 1 1 5 0.000 1
1.256 1.256 2
1.534 2.790 3
3.066 5.856 4
4.989 10.8455
5.081 15.926 6
6.256 22.182 7
6.288 28.470
7.147 8 35.617
7.312 9 42.929
7.544 50.474 10
7.617 58.091 11
12
13
N3 minggu 12
minggu 13
BULAN 4 minggu 14 minggu 15
minggu 16
minggu 17
BULAN 5 minggu 18 minggu 19
minggu 20
BOBOT PRESENTASE
100%
0.006
0.006
0.006
0.006
0.006
0.006
0.006
0.006
0.006
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
1.029 0.655
0.655
0.479
0.304 0.287
0.304
0.442 0.083 0.008 0.019 0.010 0.025 0.018
0.831 0.087 0.049
Row 189
0.004 0.010 0.065 0.022 0.358
Row 189
2.163 0.054 0.597
2.163
0.327
0.398 0.055
0.327
50%
0.398 0.055
0.013 0.182 0.001 0.014 0.007 0.020 0.023
0.258
0.162 0.636 0.722
0.722
0.911 0.530 0.025 1.059 1.929
1.929 0.548
0.847
0.847
1.096
0.398 1.096
0.046 0.248 0.306
25%
0.306 0.312
0.442 0.008 0.020 0.050
0.198 0.070
0.087 0.030 0.005 0.022
0.070 0.583
0.056 0.220 1.647 0.054 0.597
1.647
0.478 0.048 0.292 0.110
0.292
0.478
0.292
0.042 0.012 0.004 0.008 0.007 0.018 0.023 0.062
11
7.196 65.287 12
6.661 71.948 13
6.493 78.441 14
5.935 84.37715
1.240 1.240 1.240 5.038 4.546 3.077 89.414 16 93.960 17 97.037
1.240 1.583 18 98.620
0.124 1.240 1.380 100.000 19
0% 20
DAF TAR HAR GA SAT UAN PE K E R JAAN PEKERJAAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT Lokasi : Jalan Estetika Raya No.1 Tembalang, Semarang
URAIAN PEKERJAAN
NO.
KODE
I
A. 2.2.1
HARGA SATUAN PEKERJAAN PERSIAPAN
1
A.2.2.1.2
Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
2
A.2.2.1.4
Pengukuran dan Pemasangan Bouwplank
3
A.2.2.1.5
Pembuatan Kantor Sementara dg Lantai Plesteran
4
A.2.2.1.7
Pembuatan Gudang Semen dan Peralatan
5
A.2.2.1.9
Membersihkan Lapangan dan Perataan
6
A.2.2.1.10 Pembuatan Steger/Perancah dari Bambu
7
A.2.2.1.11 Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm
8
A.2.2.1.13 Bongkaran Beton Bertulang
9
A.2.2.1.14 Bongkaran Dinding Tembok Bata Merah
II
A.2.3.1
1
A.2.3.1.1
Menggali Tanah Biasa Sedalam 1 m
2
A.2.3.1.2
Menggali Tanah Biasa Sedalam 2 m
3
A.2.3.1.3
Menggali Tanah Biasa Sedalam 3 m
4
A.2.3.1.4
Menggali Tanah Keras Sedalam 1 m
5
A.2.3.1.5
Menggali Tanah Cadas Sedalam 1 m
6
A.2.3.1.6
Menggali Tanah Lumpur Sedalam 1 m
7
A.2.3.1.7
Mengerjakan Striping Tebing Setinggi 1 m
8
A.2.3.1.8
MembuangTanah sejauh 30 m'
9
A.2.3.1.9
Pengurugan Kembali
10
A.2.3.1.10 Pemadatan Tanah (per 20 cm)
11
A.2.3.1.11 Urugan Pasir
12
A.2.3.1.12 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL
13
A.2.3.1.13 Pemasangan Lapisan Ijuk tebal 10 cm unt Bidang Resapan
14
A.2.3.1.14 Mengurug Sirtu Padat
414275883.xlsx
HARGA SATUAN PEKERJAAN TANAH
157/432
sat.pekerjaan
URAIAN PEKERJAAN
NO.
KODE
III
A.3.2.1.
HARGA SATUAN PEKERJAAN PONDASI
1
A.3.2.1.1
Pemasangan Pondasi Batu Belah 1SP : 3 PP
2
A.3.2.1.2
Pemasangan Pondasi Batu Belah 1SP : 4 PP
3
A.3.2.1.3
Pemasangan Pondasi Batu Belah 1SP : 5 PP
4
A.3.2.1.4
Pemasangan Pondasi Batu Belah 1SP : 6 PP
5
A.3.2.1.5
Pemasangan Pondasi Batu Belah 1SP : 8 PP
6
A.3.2.1.6
Pemasangan Pondasi Batu Belah 1SP : 1KP : 2PP
7
A.3.2.1.7
Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP
8
A.3.2.1.8
Pemasangan Pondasi Batu Belah, ¼ SP : 1KP : 4 PP
9
A.3.2.1.9
Pemasang Batu Kosong/Anstamping
10
A.3.2.1.10 Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah
11
A.3.2.1.11 Pasang Pondasi Sumuran diameter 100 cm
IV
A.4.4.1
1
A.4.4.1.1
Pemasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1SP: 2PP
2
A.4.4.1.2
Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP
3
A.4.4.1.3
Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP
4
A.4.4.1.4
Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP
5
A.4.4.1.5
Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP
414275883.xlsx
HARGA SATUAN PEKERJAAN PASANGAN DINDING
158/432
sat.pekerjaan
URAIAN PEKERJAAN
NO.
KODE
6
A.4.4.1.6
Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3 KP :10PP
7
A.4.4.1.7
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 2PP
8
A.4.4.1.8
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
9
A.4.4.1.9
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP
10
A.4.4.1.10 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP
11
A.4.4.1.11 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
12
A.4.4.1.12 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP
13
A.4.4.1.13 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3KP : 10PP
14
A.4.4.1.14 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 1SM : 1PP
15
A.4.4.1.15 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1KP : 1SM : 2PP
16
A.4.4.1.20 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP
17
A.4.4.1.21 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP
18
A.4.4.1.22 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 2PP
19
A.4.4.1.23 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP
V
A.4.4.2
HARGA SATUAN PEKERJAAN PLESTERAN
1
A,4,4,2.1 Pemasangan Plesteran 1 Pc : 1 Pp Tebal 15 mm
2
A,4,4,2.2 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 15 mm
3
A,4,4,2.3 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm
4
A,4,4,2.4 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm
5
A,4,4,2.5 Pemasangan Plesteran 1 Pc : 5 Pp Tebal 15 mm
6
A,4,4,2.6 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm
7
A,4,4,2.7 Pemasangan Plesteran 1 Pc : 7 Pp Tebal 15 mm
8
A,4,4,2.8 Pemasangan Plesteran 1 Pc : 8 Pp Tebal 15 mm
9
A.4.4.2.9 Pemasangan Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm
10
A,4,4,2.10 Pemasangan Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm
11
A,4,4,2.11 Pemasangan Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15 mm
12
A,4,4,2.12 Pemasangan Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15 mm
13
A,4,4,2.13 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 20 mm
14
A,4,4,2.14 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm
414275883.xlsx
159/432
sat.pekerjaan
NO.
URAIAN PEKERJAAN
KODE
15
A,4,4,2.15 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 20 mm
16
A,4,4,2.16 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm
17
A,4,4,2.17 Pemasangan Plesteran 1Pc : 6Pp Tebal 20 mm
0
A,4,4,2.18 Pemasangan Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20 mm
0
A,4,4,2.19 Pemasangan Berapen 1 Pc : 5Pp Tebal 15 mm
0
A,4,4,2.20 Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm
0
A,4,4,2.23 Pemasangan Plesteran Ciprat 1Pc : 2 Pp
0
A,4,4,2.24 Pemasangan Finishing Siar Pasangan Dinding Bata Merah (=20 m')
0
A,4,4,2.25 Pemasangan Finishing Siar Pasangan Dinding Conblock ekspose (=8 m')
0
A,4,4,2.26 Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp
0
A,4,4,2.27 Pemasangan Acian
VI
A.4.6.1
1
A.4.6.1.1
Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I
2
A.4.6.1.2
Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas II atau III
3
A.4.6.1.3
Pembuatan & Pemasangan Pintu KlampStandard Kayu Klas II (Kayu Kamfer)
4
A.4.6.1.4
Pembuatan & Pemasangan Daun Pintu Klamp Sederhana Kayu Klas III
5
A.4.6.1.5
Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II
6
A.4.6.1.6
Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Klas I atau II
7
A.4.6.1.7
Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Klas I atau II (jati)
414275883.xlsx
HARGA SATUAN PEKERJAAN
K A Y U
160/432
sat.pekerjaan
URAIAN PEKERJAAN
NO.
KODE
8
A.4.6.1.8
Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm)
9
A.4.6.1.9
Pembuatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu klas I atau II
10
A.4.6.1.10 Pembuatan & Pemasangan Jalusi mati Kosen Kayu Klas I atau II
11
A.4.6.1.11 Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I
12
A.4.6.1.12 Pembuatan&Pemasangan Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II
13
A.4.6.1.13 Pembuatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter
14
A.4.6.1.14 Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Klas I
15
A.4.6.1.15 Pemasangan konstruksi Gording, Kayu Klas II
16
A.4.6.1.16 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II
17
A.4.6.1.17 Pemasangan Rangka Atap Genteng Beton, Kayu Klas II
18
A.4.6.1.18 Pemasangan Rangka Atap Sirap, Kayu Klas II
19
A.4.6.1.19 Pemasangan Rangka Langit-langit (50x1,00) m, kayu Klas II atau III
20
A.4.6.1.20 Pemasangan Rangka Langit-langit (60x60) cm, kayu Klas II atau III
21
A.4.6.1.21 Pemasangan Listplank Uk. (3x20)cm Kayu klas I atau II
22
A.4.6.1.22 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II
23
A.4.6.1.23 Pemasangan Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III
24
A.4.6.1.24 Pemasangan Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II
25
A.4.6.1.25 Pemasangan Dinding Pemisah Plywood Rangkap Rangka Kayu Klas II
26
A.4.6.1.26 Pemasangan Dinding Lambriziring dari Papan klas I
27
A.4.6.1.27 Pemasangan Dinding Lambriziring dari Plywood ukuran (120x240) cm
28
A.4.6.1.28 Pemasangan Dinding Bilik, Rangka Kayu Klas III atau IV
VII
A.4.1.1
1
A.4.1.1.1
Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87
2
A.4.1.1.2
Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78
3
A.4.1.1.3
Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72
4
A.4.1.1.4
Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
5
A.4.1.1.5
Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
6
A.4.1.1.6
Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61
7
A.4.1.1.7
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
414275883.xlsx
HARGA SATUAN PEKERJAAN
BETON
161/432
sat.pekerjaan
URAIAN PEKERJAAN
NO.
KODE
8
A.4.1.1.8
Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
9
A.4.1.1.9
Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53
10
A.4.1.1.10 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52
11
A.4.1.1.11 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49
12
A.4.1.1.12 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48
13
A.4.1.1.17 Pembesian dg Besi Polos atau Besi Ulir
14
A.4.1.1.18 Kabel Presstresed Polos/strand
15
A.4.1.1.19 Jaring Kawat baja/Wire Mesh
16
A.4.1.1.20 Memasang Bekisting untuk Pondasi
17
A.4.1.1.21 Memasang Bekisting untuk Sloof
18
A.4.1.1.22 Memasang Bekisting untuk Kolom
19
A.4.1.1.23 Memasang Bekisting untuk Balok
20
A.4.1.1.24 Memasang Bekisting untuk Lantai
21
A.4.1.1.25 Memasang Bekisting untuk Dinding
22
A.4.1.1.26 Memasang Bekisting untuk Tangga
23
A.4.1.1.27 Memasang Jembatan Cor
24
A.4.1.1.28 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)
25
A.4.1.1.29 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)
26
A.4.1.1.30 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)
414275883.xlsx
162/432
sat.pekerjaan
NO.
URAIAN PEKERJAAN
KODE
27
A.4.1.1.31 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)
28
A.4.1.1.32 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)
29
A.4.1.1.33 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)
30
A.4.1.1.34 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)
31
A.4.1.1.35 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm
32
A.4.1.1.36 Membuat Ring Balok Beton Bertulang (10 x 15) cm
VIII
A.4.5.2
1
A.4.5.2.1
Pemasangan Atap Genteng Plentong Kecil
2
A.4.5.2.2
Pemasangan Atap Genteng Kodok / Glasur
3
A.4.5.2.3
Pemasangan Atap Genteng Plentong Super / Besar
4
A.4.5.2.4
Pemasangan Genteng Bubung Plentong
5
A.4.5.2.5
Pemasangan Genteng Bubung Kodok / Glasur
6
A.4.5.2.6
Pemasangan Bubugan Genteng Beton
7
A.4.5.2.9
Pemasangan Atap Asbes Gelombang (2,25x0,92 m) x 5 mm
8
A.4.5.2.10 Pemasangan Atap Asbes Gelombang (2,00x0,92 m) x 5 mm
9
A.4.5.2.12 Pemasangan Atap Asbes Gelombang (3,00x1,05 m) x 4 mm
10
A.4.5.2.15 Pemasangan Atap Asbes Gelombang (2,10x1,05 m) x 4 mm
11
A.4.5.2.30 Pemasangan Atap Genteng Beton
12
A.4.5.2.32 Pemasangan Atap Genteng Metal
13
A.4.5.2.33 Pemasangan Atap Sirap
14
A.4.5.2.34 Pemasangan Nok Genteng Beton
15 A.4.5.2.36
HARGA SATUAN PEKERJAAN PENUTUP ATAP
Pemasangan Nok Genteng Metal
16
A.4.5.2.37 Pemasangan Nok Sirap
17
A.4.5.2.38 Pemasangan Atap Seng Gelombang
18
A.4.5.2.39 Pemasangan Atap Nok Seng
19
A.4.5.2.42 Pasang Allumunium Foil / Sisalation
IX
A.4.5.1
1
A.4.5.1.1
414275883.xlsx
HARGA SATUAN PEKERJAAN LANGIT-LANGIT Pemasangan Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm
163/432
sat.pekerjaan
URAIAN PEKERJAAN
NO.
KODE
2
A.4.5.1.2
Pemasangan Langit-langit Akustik Ukuran (30x30) cm
3
A.4.5.1.3
Pemasangan Langit-langit Akustik Ukuran (30x60) cm
4
A.4.5.1.4
Pemasangan Langit-langit Akustik Ukuran (60x120) cm
5
A.4.5.1.5
Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm
6
A.4.5.1.6
Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm
7
A.4.5.1.7
Memasang Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm
8
A.4.5.1.9
Memasang Langit-langit Akuatik Uk (60x120) cm & Rangka Allumunium
9
A.4.5.1.10 List Langit-Langit Kayu Profil
X
A.5.1.1
1
A.5.1.1.1
Memasang Closet Duduk / Mono Blok
2
A.5.1.1.2
Memasang Closet Jongkok Porselen
3
A.5.1.1.4
Memasang Urinoir
4
A.5.1.1.5
Memasang Wastafel + Kran
5
A.5.1.1.6
Pemasangan Bathcuip porselen
6
A.5.1.1.7
Pemasangan Bak Fibreglass vol.1 m3
7
A.5.1.1.8
Memasang Bak Mandi Batu Bata Vol. 0,30 m3
8
A.5.1.1.12 Pemasangan Bak Cuci Piring Stainless stell
9
A.5.1.1.14 Pemasangan Floor Drain
10
A.5.1.1.15 Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm
414275883.xlsx
HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
164/432
sat.pekerjaan
NO.
URAIAN PEKERJAAN
KODE
11
A.5.1.1.16 Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm
12
A.5.1.1.17 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm
13
A.5.1.1.18 Pemasangan Pipa Galvanis Ø ½"
14
A.5.1.1.19 Pemasangan Kran Ø ½" atau Ø ¾"
15
A.5.1.1.20 Pemasangan Pipa Galvanis Ø ¾"
16
A.5.1.1.21 Pemasangan Pipa Galvanis Ø 1"
17
A.5.1.1.22 Pemasangan Pipa Galvanis Ø 1½ "
18
A.5.1.1.23 Pemasangan Pipa Galvanis Ø 3"
19
A.5.1.1.24 Pemasangan Pipa Galvanis Ø 4"
20
A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½"
21
A.5.1.1.26 Pemasangan Pipa PVC tipe AW Ø ¾"
22
A.5.1.1.27 Pemasangan Pipa PVC tipe AW Ø 1"
23
A.5.1.1.28 Pemasangan Pipa PVC tipe AW Ø 1½"
24
A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø 2"
25
A.5.1.1.31 Pemasangan Pipa PVC tipe AW Ø 3"
26
A.5.1.1.32 Pemasangan Pipa PVC tipe AW Ø 4"
27
A.5.1.1.33 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm
28
A.5.1.1.34 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm
29
A.5.1.1.35 Pemasangan Pipa Beton Ø 20 cm
30
A.5.1.1.36 Pemasangan Pipa Beton Ø 100 cm
XI
A.4.2.1
1
A.4.2.1.1
Pemasangan Besi Profil
2
A.4.2.1.2
Pemasangan Rangka Kuda-kuda Baja IWF
3
A.4.2.1.3
Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja)
4
A.4.2.1.4
Pembuatan Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku
5
A.4.2.1.5
Pengerjaan Pengelasan dengan Las Listrik
6
A.4.2.1.7
Pemasangan Pintu Rolling Door Besi
7
A.4.2.1.8
Pemasangan Pintu Lipat (Folding Door)
8
A.4.2.1.9
Pemasangan Sunscreen Allumunium
414275883.xlsx
HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM
165/432
sat.pekerjaan
NO.
URAIAN PEKERJAAN
KODE
9
A.4.2.1.10 Pemasangan Rolling Door Allumunium
10
A.4.2.1.11 Pemasangan Kusen Pintu Allumunium
11
A.4.2.1.12 Pemasangan Pintu Allumunium Strip Lebar 8 cm
12
A.4.2.1.13 Pemasangan Pintu Kaca Rangka Allumunium
13
A.4.2.1.14 Pemasangan Venetions Blinds & Vertical Blinds
14
A.4.2.1.15 Pemasangan Terali Besi Strip (2x3) cm
15
A.4.2.1.16 Pemasangan Kawat Nyamuk
16
A.4.2.1.17 Pemasangan Jendela Nako & Tralis
17
A.4.2.1.18 Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm
18
A.4.2.1.19 Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm
19
A.4.2.1.20 Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 60x120 cm dinding partisi
20
A.4.2.1.21 Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 60x60 cm dinding plafond
XII
A.4.6.2
1
A.4.6.2.2
Pemasangan Kunci Tanam Biasa
2
A.4.6.2.3
Pemasangan Kunci Kamar Mandi
3
A.4.6.2.4
Pemasangan Kunci Selinder
4
A.4.6.2.5
Pemasangan Engsel Pintu
5
A.4.6.2.6
Pemasangan Engsel Jendela Kupu-kupu
414275883.xlsx
HARGA SATUAN PEKERJAAN KUNCI dan KACA
166/432
sat.pekerjaan
URAIAN PEKERJAAN
NO.
KODE
6
A.4.6.2.7
Pemasangan Engsel Angin
7
A.4.6.2.9
Pemasangan Kait Angin
8
A.4.6.2.10 Pasang Door Closer
9
A.4.6.2.11 Pemasangan Kunci Selot
10
A.4.6.2.13 Pemasangan Door Stop
11
A.4.6.2.14 Pemasangan Rel Pintu Dorong
12
A.4.6.2.15 Pemasangan Kunci Lemari
13
A.4.6.2.16 Pemasangan Kaca tebal 3 mm
14
A.4.6.2.17 Pemasangan Kaca tebal 5 mm
15
A.4.6.2.18 Pemasangan Kaca Cermin tebal 5 mm
XIII
A.4.4.3
1
A.4.4.3.2
Pemasangan lantai Ubin PC Abu-abu Uk. 30 x 30 cm
2
A.4.4.3.3
Pemasangan lantai Ubin PC Abu-abu Uk. 20 x 20 cm
3
A.4.4.3.5
Pemasangan lantai Ubin PC Warna Uk. 30 x 30 cm
4
A.4.4.3.6
Pemasangan lantai Ubin PC Warna Uk. 20 x 20 cm
5
A.4.4.3.9
Pemasangan lantai Ubin Granito Uk. 40 x 40 cm
6
A.4.4.3.16 Pemasangan Ubin Plin Pc.Abu-abu Uk. 15 x 20 cm
7
A.4.4.3.19 Pemasangan Ubin Plin Pc.Warna Uk. 10 x 20 cm
8
A.4.4.3.32 Pemasangan Lantai Keramik 10x 20 cm
9
A.4.4.3.33 Pemasangan lantai Keramik Uk. 10 x 10 cm / 5 x 20 cm
10
A.4.4.3.34 Pemasangan Lantai Keramik 33 x 33 cm
11
A.4.4.3.35 Pemasangan Lantai Keramik 30 x 30 cm
12
A.4.4.3.36 Pemasangan Lantai Keramik 20 x 20 cm
13
A.4.4.3.37 Pemasangan Lantai Keramik uk.10 x 33 cm, untuk variasi / border
14
A.4.4.3.39 Pemasangan Plint Keramik Ukuran 10x20 cm
15
A.4.4.3.40 Pemasangan Plint Keramik Ukuran 10x10 cm
16
A.4.4.3.41 Pemasangan Plint Keramik Ukuran 5x20 cm
17
A.4.4.3.43 Pemasangan Lantai Marmer Ukuran 1.00x1.00 cm
18
A.4.4.3.44 Pemasangan Lantai Karpet
414275883.xlsx
HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING
167/432
sat.pekerjaan
NO.
URAIAN PEKERJAAN
KODE
19
A.4.4.3.46 Pemasangan Lantai Parquet Jati
20
A.4.4.3.48 Pemasangan Dinding Porselen 11 x 11 cm
21
A.4.4.3.49 Pemasangan Dinding Keramik 10x20 cm,
22
A.4.4.3.50 Pemasangan Dinding Keramik 20 x 25cm
23
A.4.4.3.53 Pemasangan Dinding Keramik 10x20 cm,
24
A.4.4.3.55 Pemasangan Dinding Marmer Ukuran 1.00x1.00 cm
25
A.4.4.3.58 Pemasangan Dinding Batu Paros / Batu Tempel Hitam
26
A.4.4.3.59 Pemasangan Lantai Vynil uk.30 x 30 cm
27
A.4.4.3.63 Pemasangan Plint Kayu Klas II Ukuran 2x10 cm
XIV
A.4.7.1
1
A.4.7.1.1
Pengikisan / pengerokan Permukaan Cat Tembok Lama
2
A.4.7.1.2
Pencucian Bidang Permukaan Tembok yang Pernah dicat
3
A.4.7.1.3
Pengerokan Karat Cat Lama permukaan Baja dg cara manual
4
A.4.7.1.4
Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)
5
A.4.7.1.5
Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup)
6
A.4.7.1.6
Pelaburan Bidang Kayu dg Teak Oil
7
A.4.7.1.7
Pelaburan Bidang Kayu dg Politur
414275883.xlsx
HARGA SATUAN PEKERJAAN PENGECATAN
168/432
sat.pekerjaan
URAIAN PEKERJAAN
NO.
KODE
8
A.4.7.1.8
Pelaburan Bidang Kayu dg Cat Residu & Ter
9
A.4.7.1.9
Pelaburan Bidang Kayu dg Vernis
10
A.4.7.1.10 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar
11
A.4.7.1.11 Pengecatan Tembok Lama (1lap.Plamir, 2lap Cat Penutup)
12
A.4.7.1.12 Pengecatan Tembok dengan Kalkarium
13
A.4.7.1.13 Pelaburan Tembok dengan Kapur Sirih
14
A.4.7.1.14 Pelaburan Tembok lama dengan Kapur Sirih (pemeliharaan)
15
A.4.7.1.15 Pemasangan Wallpaper
16
A.4.7.1.16 Pengecatan Permukaan Baja dg Meni Besi
17
A.4.7.1.17 Pengecatan Permukaan Baja dg Meni Besi & Perancah
414275883.xlsx
169/432
sat.pekerjaan
A SAT UAN PE K E R JAAN AN RUMAH DAN TOKO BERTINGKAT
aya No.1 Tembalang, Semarang
HARGA SATUAN PEKERJAAN SAT
m'
598,752.00
m'
136,004.00
m2
1,810,858.50
m2
1,702,008.00
m2
10,560.00
m2
286,316.80
bh
487,223.00
m3
893,184.60
m3
420,852.30
m3
49,170.00
m3
60,291.00
m3
71,583.60
m3
65,445.60
m3
99,198.00
m3
79,101.00
m2
3,564.00
m3
3,564.00
m3
414275883.xlsx
(Rp)
1/3 x Gal.tanah
m3
35,640.00
m3
191,268.00
m3
257,653.00
m2
63,492.00
m3
178,860.00
170/432
sat.pekerjaan
HARGA SATUAN PEKERJAAN SAT
414275883.xlsx
(Rp)
m3
852,549.50
m3
802,290.50
m3
767,442.50
m3
742,945.50
m3
709,362.50
m3
600,451.50
m3
686,889.50
m3
652,217.50
m3
415,156.50
m3
2,284,668.10
m3
791,975.80
m2
224,224.00
m2
210,982.20
m2
201,869.80
m2
197,441.20
m2
196,526.00
171/432
sat.pekerjaan
HARGA SATUAN PEKERJAAN SAT
414275883.xlsx
(Rp)
m2
185,282.68
m2
107,461.20
m2
101,071.52
m2
97,471.00
m2
95,210.28
m2
94,099.72
m2
91,608.00
m2
93,071.00
m2
83,342.60
m2
88,214.50
m2
195,137.36
m2
196,148.48
m2
246,730.00
m2
242,935.00
m2
62,282.48
m2
55,307.60
m2
52,338.40
m2
50,271.54
m2
49,153.76
m2
48,235.84
m2
47,748.76
m2
47,261.68
m2
48,863.76
m2
46,945.80
m2
42,857.10
m2
43,259.70
m2
73,992.07
m2
54,984.48
172/432
sat.pekerjaan
HARGA SATUAN PEKERJAAN SAT
414275883.xlsx
(Rp)
m2
67,200.32
m2
65,786.95
m2
64,486.05
m2
60,492.30
m2
31,548.26
m'
49,898.20
m2
38,142.72
m2
22,436.57
m2
10,742.60
m2
47,649.14
m2
28,457.00
m3
26,851,000.00
m3
11,518,100.00
m2
465,727.90
m2
465,727.90
m2
708,372.50
m2
505,395.00
m2
1,932,425.00
173/432
sat.pekerjaan
HARGA SATUAN PEKERJAAN SAT
414275883.xlsx
(Rp)
m2
553,817.00
m2
596,123.00
m2
1,729,002.00
m2
982,817.00
m2
639,285.90
m3
10,254,090.00
m3
29,190,920.00
m3
69,245.35
m2
156,266.00
m2
183,986.00
m2
131,155.20
m2
168,091.00
m2
173,349.00
m'
289,993.00
m'
119,823.00
m2
273,887.90
m2
348,335.90
m2
355,652.00
m2
395,917.50
m2
37,838.90
m2
120,458.14
m3
923,395.00
m3
960,619.00
m3
989,747.00
m3
866,588.80
m3
1,024,199.00
m3
1,057,155.00
m3
1,081,839.00
174/432
sat.pekerjaan
HARGA SATUAN PEKERJAAN SAT
414275883.xlsx
(Rp)
m3
1,098,207.00
m3
1,126,499.00
m3
1,135,211.00
m3
1,206,089.50
m3
1,217,573.50
10 kg
158,720.10
10 kg
125,640.90
10 kg
229,379.70
m2
155,034.00
m2
166,034.00
m2
348,782.50
m2
366,932.50
m2
427,982.50
m2
398,832.50
m2
326,249.00
m2
92,409.90
m3
3,769,209.40
m3
4,608,609.50
m3
8,040,785.50
175/432
sat.pekerjaan
HARGA SATUAN PEKERJAAN SAT
414275883.xlsx
(Rp)
m3
6,321,925.50
m3
5,786,280.50
m3
5,693,593.40
m3
5,815,111.50
m'
66,977.90
m'
92,801.50
m2
64,489.15
m2
130,537.00
m2
120,747.00
m'
114,505.60
m'
101,305.60
m'
104,605.60
m2
66,396.00
m2
60,472.50
m2
52,057.50
m2
53,344.50
m2
96,657.00
m2
82,775.00
m2
101,377.10
m'
106,158.80
m'
57,055.90
m'
46,978.80
m2
34,485.00
m'
26,253.70
m2
24,083.40
m2
28,876.10
176/432
sat.pekerjaan
HARGA SATUAN PEKERJAAN SAT
414275883.xlsx
(Rp)
m2
94,965.20
m2
103,796.00
m2
85,316.00
m2
43,345.50
m2
498,322.00
m2
39,838.70
m2
191,895.00
m1
14,188.90
Unit
1,779,873.70
Unit
518,364.00
Unit
685,036.00
Unit
666,259.00
Unit
1,071,437.40
Unit
1,024,705.00
Unit
1,283,947.90
buah
336,259.00
buah
31,053.00
bh
360,527.20
177/432
sat.pekerjaan
HARGA SATUAN PEKERJAAN SAT
414275883.xlsx
(Rp)
bh
542,701.50
bh
662,843.50
m'
33,918.87
bh
72,655.00
m'
37,613.03
m'
42,443.87
m'
65,338.53
m'
165,614.53
m'
270,756.20
m'
20,055.75
m'
22,613.25
m'
27,728.25
m'
31,291.33
m'
44,078.83
m'
76,021.18
m'
93,797.00
m'
84,634.00
m'
35,907.30
m'
92,681.82
m'
528,080.30
Kg
27,968.60
kg
26,582.60
kg
72,739.70
m2
845,725.10
cm
15,981.90
m2
550,118.80
m2
525,342.40
m2
455,435.20
178/432
sat.pekerjaan
HARGA SATUAN PEKERJAAN SAT
414275883.xlsx
(Rp)
m2
454,960.00
m'
112,640.99
m2
488,347.31
m2
455,793.80
m2
163,678.90
m2
338,220.56
m2
49,676.98
m2
64,204.80
m'
172,716.50
m'
65,036.40
m2
157,782.90
m2
191,178.90
Buah
213,213.00
Buah
144,006.50
Buah
212,206.50
Buah
25,679.50
Buah
16,203.00
179/432
sat.pekerjaan
HARGA SATUAN PEKERJAAN SAT
414275883.xlsx
(Rp)
Buah
43,756.90
Buah
30,672.40
Buah
384,334.50
Buah
39,333.80
Buah
340,866.90
Buah
296,201.40
Buah
32,671.54
m2
90,110.35
m2
103,420.35
m2
336,950.35
m2
95,297.50
m2
95,209.40
m2
124,293.50
m2
120,575.40
m2
347,075.30
m'
57,815.34
m'
34,087.24
m2
189,588.74
m2
194,043.74
m2
186,045.52
m2
185,698.50
m2
187,537.90
m2
372,238.90
m'
32,470.24
m'
78,774.74
m'
76,442.74
m2
665,514.74
m2
187,771.10
180/432
sat.pekerjaan
HARGA SATUAN PEKERJAAN SAT
414275883.xlsx
(Rp)
m2
338,662.50
m2
212,301.29
m2
208,607.30
m2
200,654.30
m2
208,607.30
m2
738,153.36
m2
223,195.50
m2
133,928.30
m'
40,900.20
m2
10,349.90
m2
10,349.90
m2
10,778.90
m2
39,652.80
m2
53,479.80
m2
30,851.70
m2
40,814.40
181/432
sat.pekerjaan
HARGA SATUAN PEKERJAAN SAT
414275883.xlsx
(Rp)
m2
7,862.80
m2
32,698.60
m2
17,285.51
m2
11,839.74
m2
6,768.74
m2
11,855.47
m2
5,976.85
m2
76,422.50
m2
22,867.90
m2
46,389.75
182/432
sat.pekerjaan
No.
SNI
I
A. 2.2.1
1
A.2.2.1.2
KODE
KOEF
URAIAN PAKERJAAN
SAT.
HARGA SATUAN PEKERJAAN PERSIAPAN 1
m' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m A
TENAGA
L.01
0.2
OH Pekerja
L.02
0.4
OH Tukang Kayu
L.03
0.02
OH Kepala Tukang
L.04
0.02
OH Mandor B
1.25
BAHAN
Btg Kayu Dolken diameter 8 - 10 / 400 cm
2.5
Kg Portalnd Semen
1.2
Lbr Seng Gelombang 3" - 5"
0.005
m3 Pasir Beton
0.009
m3 Koral Beton
0.072
m3 Kayu 5/7X4m Kayu Kruing
0.06
Kg Paku Biasa 2" - 5"
0.45
Kg Meni Besi C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
10%
F
2
A.2.2.1.4
1
Harga Satuan Pekerjaan (D+E) Overhead & Profit (contah 10%) m' Pengukuran dan Pemasangan Bouwplank A
L.01
0.1
OH Pekerja
L.02
0.1
OH Tukang Kayu
L.03
0.01
L.04
0.005
OH Kepala Tukang OH Mandor B
0.012 0.02 0.007
3
A.2.2.1.5
Tenaga
1
Bahan
m3 Kayu 5/7x 4m Kayu Kruing Kg Paku Biasa 2" - 5" m3 Kayu Papan 3/20 Kruing C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
10%
m2 Pembuatan Kantor Sementara dg Lantai Plesteran A
Tenaga
No.
SNI
KODE
KOEF
URAIAN PAKERJAAN
SAT.
L.01
2
OH Pekerja
L.02
2
OH Tukang Kayu
L.02
1
OH Tukang Batu
L.03
0.3
L.04
0.05
OH Kepala Tukang OH Mandor B
Bahan
1.25
Btg Kayu Dolken Ø 8 - 10 / 4 m
0.18
m3 Kayu
0.85
Kg Paku Biasa 2" - 5"
1.1
Kg Besi Strip
35
Kg Portland Sement
0.15
m3 Pasir pasang
0.1
m3 Pasir Beton
0.15
m3 Koral Beton
30 buah Batu bata Merah 0.25
Lbr Seng Plat
2 buah Jendela Naco 0.08
m2 Kaca Polos
0.15 buah Kunci Tanam 0.3 buah Engsel 0.06
Lbr Plywood 4 mm
No.
4
SNI
KODE
KOEF
1
A.2.2.1.7
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
1
OH Pekerja
L.02
2
OH Tukang Kayu
L.03
0.2
L.04
0.05
OH Kepala Tukang OH Mandor B
0.21 0.3
A.2.2.1.9
Bahan
Btg Kayu Dolken diameter 8 - 10 / 400 cm m3 Kayu Kg Paku Biasa 2" - 5"
10.5
Kg Portland Semen
0.03
m3 Pasir Beton
0.05
m3 Koral Beton
1.5
1
Lbr Seng Gelombang BJLS 32 C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
Tenaga
L.01
0.1
OH Pekerja
L.04
0.05
OH Mandor
A.2.2.1.10
1
B
Bahan
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
m2 Pembuatan Steger/Perancah dari Bambu A
Tenaga
L.01
1.00
OH Pekerja
L.02
2.00
OH Tukang Kayu
L.03
0.200
L.04
0.0500
OH Kepala Tukang OH Mandor B
1.250
10%
m2 Membersihkan Lapangan dan Perataan A
6
Tenaga
L.01
1.7
10%
m2 Pembuatan Gudang Semen dan Peralatan A
5
URAIAN PAKERJAAN
SAT.
Bahan
Btg Bambu diameter 6 - 8 / 600 cm
10%
No.
SNI
KODE
KOEF 0.186
7
A.2.2.1.11
Kg Tali Ijuk C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
10%
1 bh Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm A
Tenaga
L.02
0.300
OH Tukang Kayu
L.03
0.030
OH Kepala Tukang B
8
URAIAN PAKERJAAN
SAT.
A.2.2.1.13
Bahan
0.036
m3 Kayu Papan Kelas III
0.036
m3 Kayu Balok Kelas III
0.080
kg Paku Biasa
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
10%
m3 Bongkaran Beton Bertulang A
Tenaga
L.02
13.334
OH Pekerja
L.04
0.666
OH Mandor B
Bahan
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
10%
No.
SNI
9
A.2.2.1.14
KODE
KOEF
URAIAN PAKERJAAN
SAT.
1
m3 Bongkaran Dinding Tembok Bata Merah B
Tenaga
L.02
6.667
OH Pekerja
L.04
0.033
OH Mandor B
Bahan
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
10%
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
dari Seng Gelombang Tinggi 2,00 m
598,752.00 `
48,300.00 57,000.00
11,400.00
84,000.00
33,600.00
87,000.00
1,740.00
78,000.00
1,560.00 496,020.00
18,000.00
22,500.00
1,360.00
3,400.00
50,000.00
60,000.00
280,000.00
1,400.00
270,000.00
2,430.00
5,500,000.00
396,000.00
14,000.00
840.00
21,000.00
9,450.00 544,320.00 54,432.00 598,752.00 136,004.00 15,360.00
57,000.00
5,700.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
390.00 108,280.00
5,500,000.00
66,000.00
14,000.00
280.00
6,000,000.00
42,000.00 123,640.00 12,364.00 136,004.00 1,810,858.50 396,000.00
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
57,000.00
114,000.00
84,000.00
168,000.00
84,000.00
84,000.00
87,000.00
26,100.00
78,000.00
3,900.00 1,250,235.00
18,000.00
22,500.00
5,500,000.00
990,000.00
14,000.00
11,900.00
12,500.00
13,750.00
1,360.00
47,600.00
210,000.00
31,500.00
280,000.00
28,000.00
270,000.00
40,500.00
520.00
15,600.00
15,000.00
3,750.00
12,500.00
25,000.00
61,000.00
4,880.00
67,500.00
10,125.00
4,500.00
1,350.00
63,000.00
3,780.00
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
1,646,235.00 164,623.50 1,810,858.50 1,702,008.00 246,300.00 57,000.00
57,000.00
84,000.00
168,000.00
87,000.00
17,400.00
78,000.00
3,900.00 1,300,980.00
18,000.00
30,600.00
5,500,000.00
1,155,000.00
14,000.00
4,200.00
1,360.00
14,280.00
280,000.00
8,400.00
270,000.00
13,500.00
50,000.00
75,000.00 1,547,280.00 154,728.00 1,702,008.00 10,560.00 9,600.00
57,000.00
5,700.00
78,000.00
3,900.00
9,600.00 960.00 10,560.00 286,316.80 246,300.00 57,000.00
57,000.00
84,000.00
168,000.00
87,000.00
17,400.00
78,000.00
3,900.00 13,988.00
10,000.00
12,500.00
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
8,000.00
1,488.00 260,288.00 26,028.80 286,316.80 487,223.00 27,810.00
84,000.00
25,200.00
87,000.00
2,610.00 415,120.00
6,000,000.00
216,000.00
5,500,000.00
198,000.00
14,000.00
1,120.00 442,930.00 44,293.00 487,223.00 893,184.60 811,986.00
57,000.00
760,038.00
78,000.00
51,948.00
811,986.00 81,198.60 893,184.60
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
420,852.30 382,593.00 57,000.00
380,019.00
78,000.00
2,574.00
382,593.00 38,259.30 420,852.30
No.
SNI
II
A.2.3.1
1
A.2.3.1.1
KODE
KOEF
URAIAN PEKERJAAN
SAT.
HARGA SATUAN PEKERJAAN TANAH 1
m3 A
Menggali Tanah Biasa Sedalam 1 m TENAGA
L.01
0.75
OH
Pekerja
L.04
0.025
OH
Mandor
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E) Overhead & Profit (contah 10%)
2
A.2.3.1.2
1
m3 A
3
TENAGA
L.01
0.90
OH
Pekerja
L.04
0.045
OH
Mandor
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
A.2.3.1.3
1
m3 A
4
Menggali Tanah Biasa Sedalam 2 m
Menggali Tanah Biasa Sedalam 3 m TENAGA
L.01
1.05
OH
Pekerja
L.04
0.067
OH
Mandor
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
A.2.3.1.4
1
m3
Menggali Tanah Keras Sedalam 1 m TENAGA
5 414275883.xlsx
A.2.3.1.5
L.01
1.000
OH
Pekerja
L.04
0.032
OH
Mandor
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m3
Menggali Tanah Cadas Sedalam 1 m 432/193
abk 2-14
No.
SNI
KODE
KOEF
A
6
1.50
OH
Pekerja
L.04
0.060
OH
Mandor
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
A.2.3.1.6
1
m3
TENAGA
1.200
OH
Pekerja
L.04
0.045
OH
Mandor
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
A.2.3.1.7
1
m2
Mengerjakan Striping Tebing Setinggi 1 m TENAGA
L.01
0.05
OH
Pekerja
L.04
0.005
OH
Mandor
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
m3
MembuangTanah sejauh 30 m'
A.2.3.1.8
1
A
414275883.xlsx
Menggali Tanah Lumpur Sedalam 1 m
L.01
A
8
TENAGA
L.01
A
7
URAIAN PEKERJAAN
SAT.
TENAGA
L.01
0.330
OH
Pekerja
L.04
0.010
OH
Mandor
432/194
abk 2-14
No.
9
SNI
KODE
A.2.3.1.9
KOEF
1
URAIAN PEKERJAAN
SAT. B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
m3
Pengurugan Kembali
Pengurugan Kembali di hitung dari 1/3 kali koefisien Peke A
10
L.01
0.50
OH
Pekerja
L.04
0.050
OH
Mandor
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
m3
Pemadatan Tanah (per 20 cm)
A.2.3.1.10
1
A
11
0.5
OH
Pekerja
L.04
0.05
OH
Mandor
B
BAHAN
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
A.2.3.1.11
1
m3
Urugan Pasir TENAGA
L.01
0.30
OH
Pekerja
L.04
0.01
OH
Mandor
B
BAHAN
1.2
A.2.3.1.12
1
m3
Pasir Urug
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
m3 A
414275883.xlsx
TENAGA
L.01
A
12
TENAGA
Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL TENAGA
L.01
0.800
OH
Pekerja
L.02
0.400
OH
Tukang Batu
L.03
0.04
OH
Kepala Tukang 432/195
abk 2-14
No.
SNI
KODE L.04
13
A.2.3.1.13
KOEF 0.080
OH
Mandor
B
BAHAN
0.135
m3
Pasir Pasang
0.400
m3
Kapur Padam
0.080
m3
Tanah Liat
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
m2 A
A.2.3.1.14
TENAGA
OH
Pekerja
0.015
OH
Mandor
B
BAHAN
kg
Ijuk
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m3 A
Mengurug Sirtu Padat TENAGA
0.25
OH
Pekerja
0.025
OH
Mandor
B
BAHAN
1.2
414275883.xlsx
Pemasangan Lapisan Ijuk tebal 10 cm unt Bidang Resapa
0.15
6.00
14
URAIAN PEKERJAAN
SAT.
m3
Sirtu
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contah 10%)
F
Harga Satuan Pekerjaan (D+E)
432/196
abk 2-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
49,170.00 44,700.00 57,000.00
42,750.00
78,000.00
1,950.00
44,700.00 4,470.00
10%
49,170.00 60,291.00 54,810.00 57,000.00
51,300.00
78,000.00
3,510.00
54,810.00 5,481.00
10%
60,291.00 71,583.60 65,076.00 57,000.00
59,850.00
78,000.00
5,226.00
65,076.00 6,507.60
10%
71,583.60 65,445.60 59,496.00 57,000.00
57,000.00
78,000.00
2,496.00
59,496.00 5,949.60
10%
65,445.60 99,198.00 414275883.xlsx
432/197
abk 2-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 90,180.00
57,000.00
85,500.00
78,000.00
4,680.00
90,180.00 9,018.00
10%
99,198.00 79,101.00 71,910.00 57,000.00
68,400.00
78,000.00
3,510.00
71,910.00 7,191.00
10%
79,101.00 3,564.00 3,240.00 57,000.00
2,850.00
78,000.00
390.00
3,240.00 324.00
10%
3,564.00 21,549.00 19,590.00
414275883.xlsx
57,000.00
18,810.00
78,000.00
780.00
432/198
abk 2-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
19,590.00 1,959.00
10%
21,549.00 11,880.00
bali di hitung dari 1/3 kali koefisien Pekerjaan galian
32,400.00 57,000.00
28,500.00
78,000.00
3,900.00
32,400.00 3,240.00
10%
35,640.00 35,640.00 32,400.00 57,000.00
28,500.00
78,000.00
3,900.00
32,400.00 3,240.00
10%
35,640.00 191,268.00 17,880.00 57,000.00
17,100.00
78,000.00
780.00 156,000.00
130,000.00
156,000.00 173,880.00 17,388.00
10%
191,268.00 257,653.00 88,920.00
414275883.xlsx
57,000.00
45,600.00
84,000.00
33,600.00
87,000.00
3,480.00
432/199
abk 2-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
78,000.00
6,240.00 145,310.00
210,000.00
28,350.00
270,000.00
108,000.00
112,000.00
8,960.00 234,230.00 23,423.00
10%
257,653.00
san Ijuk tebal 10 cm unt Bidang Resapan
63,492.00 9,720.00 57,000.00
8,550.00
78,000.00
1,170.00 48,000.00
8,000.00
48,000.00 57,720.00 5,772.00
10%
63,492.00 178,860.00 16,200.00 57,000.00
14,250.00
78,000.00
1,950.00 146,400.00
122,000.00
146,400.00 162,600.00 16,260.00
10%
178,860.00
414275883.xlsx
432/200
abk 2-14
No.
SNI
III
A.3.2.1.
1
A.3.2.1.1
KODE
KOEF
HARGA SATUAN PEKERJAAN PONDASI 1
m3 A
2
414275883.xlsx
Pemasangan Pondasi Batu Belah 1SP : 3 PP TENAGA
L.01
1.5
OH
Pekerja
L.02
0.750
OH
Tukang Batu
L.03
0.075
OH
Kepala Tukang
L.04
0.075
OH
Mandor
B
BAHAN
1.2
m3
Batu Belah 15/20
202
Kg
Portland Sement
0.485
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%) Pemasangan Pondasi Batu Belah 1SP : 4 PP
1
A.3.2.1.2
m3 A
3
URAIAN PEKERJAAN
SAT.
TENAGA
L.01
1.5
OH
Pekerja
L.02
0.750
OH
Tukang Batu
L.03
0.075
OH
Kepala Tukang
L.04
0.075
OH
Mandor
B
BAHAN
1.2
m3
Batu Belah 15/20
163
Kg
Portland Sement
0.52
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
A.3.2.1.3
m3 A
Pemasangan Pondasi Batu Belah 1SP : 5 PP TENAGA
L.01
1.5
OH
Pekerja
L.02
0.750
OH
Tukang Batu
L.03
0.075
OH
Kepala Tukang
L.04
0.075
OH
Mandor
B
BAHAN
1.2
m3
Batu Belah 15/20
432/201
abk 3-14
No.
4
SNI
KODE
KOEF 136
Kg
Portland Sement
0.544
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
A.3.2.1.4
m3 A
5
414275883.xlsx
URAIAN PEKERJAAN
SAT.
Pemasangan Pondasi Batu Belah 1SP : 6 PP TENAGA
L.01
1.5
OH
Pekerja
L.02
0.750
OH
Tukang Batu
L.03
0.075
OH
Kepala Tukang
L.04
0.075
OH
Mandor
B
BAHAN
1.2
m3
Batu Belah 15/20
117
Kg
Portland Sement
0.561
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
A.3.2.1.5
m3
Pemasangan Pondasi Batu Belah 1SP : 8 PP
A
Tenaga
L.01
1.5
OH
Pekerja
L.02
0.750
OH
Tukang Batu
L.03
0.075
OH
Kepala Tukang
L.04
0.075
OH
Mandor
432/202
abk 3-14
No.
SNI
KODE
KOEF
B
6
7
414275883.xlsx
Bahan
1.2
m3
Batu Belah 15/20
91
Kg
Portland Sement
0.584
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
A.3.2.1.6
URAIAN PEKERJAAN
SAT.
m3
Pemasangan Pondasi Batu Belah 1SP : 1KP : 2PP
A
Tenaga
L.01
1.5
OH
Pekerja
L.02
0.750
OH
Tukang Batu
L.03
0.075
OH
Kepala Tukang
L.04
0.075
OH
Mandor
B
Bahan
1.2
m3
Batu Belah 15/20
0.17
m3
Kapur Pasang (KP)
0.17
Kg
Semen Merah (SM)
0.340
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
A.3.2.1.7
m3
Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP
A
Tenaga
L.01
1.5
OH
Pekerja
L.02
0.750
OH
Tukang Batu
L.03
0.075
OH
Kepala Tukang
L.04
0.075
OH
Mandor
B
Bahan
1.2
m3
Batu Belah 15/20
61
kg
Portland Sement
0.147
m3
Kapur Pasang
0.492
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
432/203
abk 3-14
No.
SNI
KODE
KOEF
F 8
9
414275883.xlsx
1
A.3.2.1.8
URAIAN PEKERJAAN
SAT.
m3
Harga Satuan Pekerjaan (D+E) Pemasangan Pondasi Batu Belah, ¼ SP : 1KP : 4 PP
A
Tenaga
L.01
1.5
OH
Pekerja
L.02
0.750
OH
Tukang Batu
L.03
0.075
OH
Kepala Tukang
L.04
0.075
OH
Mandor
B
Bahan
1.2
m3
Batu Belah 15/20
41
kg
Portland Sement
0.131
m3
Kapur Pasang
0.492
m3
Pasir
1
A.3.2.1.9
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m3
Pemasang Batu Kosong/Anstamping
A
Tenaga
L.01
0.78
OH
Pekerja
L.02
0.39
OH
Tukang Batu
L.03
0.039
OH
Kepala Tukang
L.04
0.039
OH
Mandor
B
Bahan
1.2
m3
Batu Belah 15/20
0.432
m3
Pasir Urug
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/204
abk 3-14
No.
SNI
10
A.3.2.1.10
11
414275883.xlsx
KODE
KOEF
URAIAN PEKERJAAN
SAT. 1
m3
Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR
A
Tenaga
L.01
3.4
OH
Pekerja
L.02
0.85
OH
Tukang Batu
L.03
0.085
OH
Kepala Tukang
L.04
0.15
OH
Mandor
B
Bahan
0.480
m3
Batu Belah 15/20 cm
126
Kg
Besi Beton
194
Kg
Portland Semen
0.312
m3
Pasir Beton
0.468
m3
Koral Beton
1.8
Kg
Kawat Beton
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
A.3.2.1.11
m3
Pasang Pondasi Sumuran diameter 100 cm
A
Tenaga
L.01
2.40
OH
Pekerja
L.02
0.8
OH
Tukang Batu
L.03
0.08
OH
Kepala Tukang
L.04
0.119
OH
Mandor
B
Bahan
0.45
m3
Batu Belah 15/20 cm
194
Kg
Portland Semen
0.312
m3
Pasir Beton
0.468
m3
Koral Beton
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/205
abk 3-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
N PEKERJAAN PONDASI
414275883.xlsx
852,549.50 160,875.00 57,000.00
85,500.00
84,000.00
63,000.00
87,000.00
6,525.00
78,000.00
5,850.00 614,170.00
198,000.00
237,600.00
1,360.00
274,720.00
210,000.00
101,850.00 775,045.00 77,504.50
10%
852,549.50 802,290.50 160,875.00 57,000.00
85,500.00
84,000.00
63,000.00
87,000.00
6,525.00
78,000.00
5,850.00 568,480.00
198,000.00
237,600.00
1,360.00
221,680.00
210,000.00
109,200.00 729,355.00 72,935.50
10%
802,290.50 767,442.50 160,875.00 57,000.00
85,500.00
84,000.00
63,000.00
87,000.00
6,525.00
78,000.00
5,850.00 536,800.00
198,000.00 432/206
237,600.00 abk 3-14
URAIAN PEKERJAAN
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
1,360.00
184,960.00
210,000.00
114,240.00 697,675.00 69,767.50
10%
767,442.50 742,945.50 160,875.00 57,000.00
85,500.00
84,000.00
63,000.00
87,000.00
6,525.00
78,000.00
5,850.00 514,530.00
198,000.00
237,600.00
1,360.00
159,120.00
210,000.00
117,810.00 675,405.00 67,540.50
10%
742,945.50 709,362.50 160,875.00 57,000.00
85,500.00
84,000.00
63,000.00
87,000.00
6,525.00
78,000.00
5,850.00
432/207
abk 3-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 484,000.00
198,000.00
237,600.00
1,360.00
123,760.00
210,000.00
122,640.00 644,875.00 64,487.50
10%
709,362.50
dasi Batu Belah 1SP : 1KP : 2PP
600,451.50 160,875.00 57,000.00
85,500.00
84,000.00
63,000.00
87,000.00
6,525.00
78,000.00
5,850.00 384,990.00
198,000.00
237,600.00
270,000.00
45,900.00
177,000.00
30,090.00
210,000.00
71,400.00 545,865.00 54,586.50
10%
600,451.50
dasi Batu Belah, 1 SP : 3 KP : 10 PP
414275883.xlsx
686,889.50 160,875.00 57,000.00
85,500.00
84,000.00
63,000.00
87,000.00
6,525.00
78,000.00
5,850.00 463,570.00
198,000.00
237,600.00
1,360.00
82,960.00
270,000.00
39,690.00
210,000.00
103,320.00 624,445.00 62,444.50
10% 432/208
abk 3-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 686,889.50
dasi Batu Belah, ¼ SP : 1KP : 4 PP
414275883.xlsx
652,217.50 160,875.00 57,000.00
85,500.00
84,000.00
63,000.00
87,000.00
6,525.00
78,000.00
5,850.00 432,050.00
198,000.00
237,600.00
1,360.00
55,760.00
270,000.00
35,370.00
210,000.00
103,320.00 592,925.00 59,292.50
10%
652,217.50 415,156.50 83,655.00 57,000.00
44,460.00
84,000.00
32,760.00
87,000.00
3,393.00
78,000.00
3,042.00 293,760.00
198,000.00
237,600.00
130,000.00
56,160.00 377,415.00 37,741.50
10%
415,156.50
432/209
abk 3-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah
414275883.xlsx
2,284,668.10 284,295.00 57,000.00
193,800.00
84,000.00
71,400.00
87,000.00
7,395.00
78,000.00
11,700.00 1,792,676.00
198,000.00
95,040.00
10,000.00
1,260,000.00
1,360.00
263,840.00
280,000.00
87,360.00
127,000.00
59,436.00
15,000.00
27,000.00 2,076,971.00 207,697.10
10%
2,284,668.10 791,975.80 220,242.00 57,000.00
136,800.00
84,000.00
67,200.00
87,000.00
6,960.00
78,000.00
9,282.00 499,736.00
198,000.00
89,100.00
1,360.00
263,840.00
280,000.00
87,360.00
127,000.00
59,436.00 719,978.00 71,997.80
10%
791,975.80
432/210
abk 3-14
No.
SNI
IV
A.4.4.1
414275883.xlsx
KODE
KOEF
URAIAN PEKERJAAN
SAT.
HARGA SATUAN PEKERJAAN PASANGAN DINDING
1 A.4.4.1.1
1
m2
Pemasangan Dinding Bata Merah ukuran (5x11x22) cm Teba
A
Tenaga
L.01
0.6
OH
Pekerja
L.02
0.2
OH
Tukang Batu
L.03
0.02
OH
Kepala Tukang Batu
L.04
0.03
OH
Mandor
B
Bahan
140
2 A.4.4.1.2
Buah Bata Merah
43.5
Kg
Portland Semen (PC)
0.08
m3
Pasir Pasang (PP)
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%) Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teba
m2 A
Tenaga
L.01
0.6
OH
Pekerja
L.02
0.2
OH
Tukang Batu
L.03
0.02
OH
Kepala Tukang Batu
L.04
0.03
OH
Mandor
B
Bahan
140
3 A.4.4.1.3
Buah Bata Merah
32.95
Kg
Portland Semen (PC)
0.091
m3
Pasir Pasang (PP)
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teba
A
Tenaga
L.01
0.6
OH
Pekerja
L.02
0.2
OH
Tukang Batu
432/211
abk 4-14
No.
414275883.xlsx
SNI
KODE
KOEF
URAIAN PEKERJAAN
SAT.
L.03
0.02
OH
Kepala Tukang Batu
L.04
0.03
OH
Mandor
B
Bahan
140
4 A.4.4.1.4
Buah Bata Merah
26.55
Kg
Portland Semen (PC)
0.093
m3
Pasir Pasang (PP)
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teba
A
Tenaga
L.01
0.6
OH
Pekerja
L.02
0.2
OH
Tukang Batu
L.03
0.02
OH
Kepala Tukang Batu
L.04
0.03
OH
Mandor
B
Bahan
140
Buah Bata Merah
22.2
Kg
Portland Semen (PC)
0.102
m3
Pasir Pasang (PP)
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/212
abk 4-14
No.
414275883.xlsx
SNI
KODE
5 A.4.4.1.5
KOEF
URAIAN PEKERJAAN
SAT. 1
m2
Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teba
A
Tenaga
L.01
0.6
OH
Pekerja
L.02
0.2
OH
Tukang Batu
L.03
0.02
OH
Kepala Tukang Batu
L.04
0.03
OH
Mandor
B
Bahan
140
6 A.4.4.1.6
Buah Bata Merah
18.5
Kg
Portland Semen (PC)
0.122
m3
Pasir Pasang (PP)
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teba
A
Tenaga
L.01
0.6
OH
Pekerja
L.02
0.2
OH
Tukang Batu
L.03
0.02
OH
Kepala Tukang Batu
L.04
0.03
OH
Mandor
B
Bahan
140
7 A.4.4.1.7
Buah Bata Merah
10.08
Kg
Portland Semen (PC)
0.0925
m3
Pasir Pasang (PP)
0.0275
m3
Kapur Pasang (KP)
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal
A
Tenaga
L.01
0.30
OH
Pekerja
L.02
0.1
OH
Tukang Batu
432/213
abk 4-14
No.
414275883.xlsx
SNI
KODE
KOEF
URAIAN PEKERJAAN
SAT.
L.03
0.01
OH
Kepala Tukang
L.04
0.015
OH
Mandor
B
Bahan
70
8 A.4.4.1.8
Buah Bata Merah 5 x 11 x 22
18.95
Kg
Portland Semen
0.038
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal
A
Tenaga
L.01
0.30
OH
Pekerja
L.02
0.1
OH
Tukang Batu
L.03
0.01
OH
Kepala Tukang
L.04
0.015
OH
Mandor
B
Bahan
70
Buah Bata Merah 5 x 11 x 22
14.37
Kg
Portland Semen
0.04
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/214
abk 4-14
No.
414275883.xlsx
SNI
KODE
9 A.4.4.1.9
KOEF
URAIAN PEKERJAAN
SAT. 1
m2
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal
A
Tenaga
L.01
0.30
OH
Pekerja
L.02
0.1
OH
Tukang Batu
L.03
0.01
OH
Kepala Tukang
L.04
0.015
OH
Mandor
B
Bahan
70
10 A.4.4.1.10
Buah Bata Merah 5 x 11 x 22
11.50
Kg
Portland Semen
0.043
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal
A
Tenaga
L.01
0.30
OH
Pekerja
L.02
0.1
OH
Tukang Batu
L.03
0.01
OH
Kepala Tukang
L.04
0.015
OH
Mandor
B
Bahan
70
11 A.4.4.1.11
Buah Bata Merah 5 x 11 x 22
9.68
Kg
Portland Semen
0.045
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal
A
Tenaga
L.01
0.30
OH
Pekerja
L.02
0.1
OH
Tukang Batu
L.03
0.01
OH
Kepala Tukang
432/215
abk 4-14
No.
414275883.xlsx
SNI
KODE L.04
KOEF 0.015
70
12 A.4.4.1.12
URAIAN PEKERJAAN
SAT. OH
Mandor
B
Bahan
Buah Bata Merah 5 x 11 x 22
8.32
Kg
Portland Semen
0.049
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal
A
Tenaga
L.01
0.30
OH
Pekerja
L.02
0.1
OH
Tukang Batu
L.03
0.01
OH
Kepala Tukang
L.04
0.015
OH
Mandor
B
Bahan
70
Buah Bata Merah 5 x 11 x 22
6.50
Kg
Portland Semen
0.05
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/216
abk 4-14
No.
414275883.xlsx
SNI
KODE
13 A.4.4.1.13
KOEF
URAIAN PEKERJAAN
SAT. 1
m2
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal
A
Tenaga
L.01
0.30
OH
Pekerja
L.02
0.1
OH
Tukang Batu
L.03
0.01
OH
Kepala Tukang
L.04
0.015
OH
Mandor
B
Bahan
70
14 A.4.4.1.14
Buah Bata Merah 5 x 11 x 22
4.5
Kg
Portland Semen
0.05
m3
Pasir Pasang
0.015
m3
Kapur Padam
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal
A
Tenaga
L.01
0.30
OH
Pekerja
L.02
0.1
OH
Tukang Batu
L.03
0.01
OH
Kepala Tukang
L.04
0.015
OH
Mandor
B
Bahan
70
15 A.4.4.1.15
0.018
m3
Semen Merah
0.018
m3
Pasir Pasang
0.018
m3
Kapur Padam
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
L.01
Buah Bata Merah 5 x 11 x 22
0.30
m2
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal
A
Tenaga
OH
Pekerja
432/217
abk 4-14
No.
414275883.xlsx
SNI
KODE
KOEF
URAIAN PEKERJAAN
SAT.
L.02
0.1
OH
Tukang Batu
L.03
0.01
OH
Kepala Tukang
L.04
0.015
OH
Mandor
B
Bahan
70
16 A.4.4.1.20
Buah Bata Merah 5 x 11 x 22
0.014
m3
Semen Merah
0.028
m3
Pasir Pasang
0.014
m3
Kapur Padam
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP
A
Tenaga
L.01
0.300
OH
Pekerja
L.02
0.100
OH
Tukang Batu
L.03
0.010
OH
Kepala Tukang
L.04
0.015
OH
Mandor
B
Bahan
12.500
buah
Batako
15.160
kg
PC
0.364
m3
Pasir Pasang
0.280
kg
Besi Angkur Ø 8 mm
432/218
abk 4-14
No.
414275883.xlsx
SNI
KODE
17 A.4.4.1.21
KOEF
URAIAN PEKERJAAN
SAT.
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP
A
Tenaga
L.01
0.300
OH
Pekerja
L.02
0.100
OH
Tukang Batu
L.03
0.010
OH
Kepala Tukang
L.04
0.015
OH
Mandor
B
Bahan
12.500
buah
Batako
12.130
kg
PC
0.388
m3
Pasir Pasang
0.280
kg
Besi Angkur Ø 8 mm
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
18 A.4.4.1.22
1
m2
Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm
A
Tenaga
L.01
0.30
OH
Pekerja
L.02
0.1
OH
Tukang Batu
L.03
0.01
OH
Kepala Tukang
L.04
0.015
OH
Mandor
B
Bahan
30
Buah Terawang / Roster
14
kg
Portland Semen
0.032
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
432/219
abk 4-14
No.
414275883.xlsx
SNI
KODE
KOEF
F
19 A.4.4.1.23
URAIAN PEKERJAAN
SAT.
1
m2
Harga Satuan Pekerjaan (D+E)
Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm
A
Tenaga
L.01
0.30
OH
Pekerja
L.02
0.1
OH
Tukang Batu
L.03
0.01
OH
Kepala Tukang
L.04
0.015
OH
Mandor
B
Bahan
30
Buah Terawang / Roster
11
kg
Portland Semen
0.035
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/220
abk 4-14
RAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
ERJAAN PASANGAN DINDING
ta Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1SP: 2PP
224,224.00 55,080.00 57,000.00
34,200.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
2,340.00 148,760.00
520.00
72,800.00
1,360.00
59,160.00
210,000.00
16,800.00
203,840.00 20,384.00
10%
224,224.00
ta Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP
210,982.20 55,080.00 57,000.00
34,200.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
2,340.00 136,722.00
520.00
72,800.00
1,360.00
44,812.00
210,000.00
19,110.00
191,802.00 19,180.20
10%
210,982.20
ta Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP
414275883.xlsx
201,869.80 55,080.00
432/221
57,000.00
34,200.00
84,000.00
16,800.00 abk 4-14
RAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 87,000.00
1,740.00
78,000.00
2,340.00 128,438.00
520.00
72,800.00
1,360.00
36,108.00
210,000.00
19,530.00
183,518.00 18,351.80
10%
201,869.80
ta Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP
414275883.xlsx
197,441.20 55,080.00 57,000.00
34,200.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
2,340.00 124,412.00
520.00
72,800.00
1,360.00
30,192.00
210,000.00
21,420.00
179,492.00 17,949.20
10%
197,441.20
432/222
abk 4-14
RAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
ta Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP
196,526.00 55,080.00 57,000.00
34,200.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
2,340.00 123,580.00
520.00
72,800.00
1,360.00
25,160.00
210,000.00
25,620.00
178,660.00 17,866.00
10%
196,526.00
ta Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3 KP :10PP
185,282.68 55,080.00
57,000.00
34,200.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
2,340.00 113,358.80
520.00
72,800.00
1,360.00
13,708.80
210,000.00
19,425.00
270,000.00
7,425.00
168,438.80 16,843.88
10%
185,282.68
ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 2PP
414275883.xlsx
107,461.20 27,540.00
432/223
57,000.00
17,100.00
84,000.00
8,400.00 abk 4-14
RAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 87,000.00
870.00
78,000.00
1,170.00 70,152.00
520.00
36,400.00
1,360.00
25,772.00
210,000.00
7,980.00
97,692.00 9,769.20
10%
107,461.20
ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
414275883.xlsx
101,071.52 27,540.00 57,000.00
17,100.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
1,170.00 64,343.20
520.00
36,400.00
1,360.00
19,543.20
210,000.00
8,400.00
91,883.20 9,188.32
10%
101,071.52
432/224
abk 4-14
RAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP
97,471.00 27,540.00 57,000.00
17,100.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
1,170.00 61,070.00
520.00
36,400.00
1,360.00
15,640.00
210,000.00
9,030.00
88,610.00 8,861.00
10%
97,471.00
ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP
95,210.28 27,540.00 57,000.00
17,100.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
1,170.00 59,014.80
520.00
36,400.00
1,360.00
13,164.80
210,000.00
9,450.00
86,554.80 8,655.48
10%
95,210.28
ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
414275883.xlsx
94,099.72 27,540.00
432/225
57,000.00
17,100.00
84,000.00
8,400.00
87,000.00
870.00 abk 4-14
RAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 78,000.00
58,005.20 520.00
36,400.00
1,360.00
11,315.20
210,000.00
10,290.00
85,545.20 8,554.52
10%
94,099.72
ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP
414275883.xlsx
1,170.00
91,608.00 27,540.00 57,000.00
17,100.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
1,170.00 55,740.00
520.00
36,400.00
1,360.00
8,840.00
210,000.00
10,500.00
83,280.00 8,328.00
10%
91,608.00
432/226
abk 4-14
RAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3KP : 10PP
93,071.00 27,540.00
57,000.00
17,100.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
1,170.00 57,070.00
520.00
36,400.00
1,360.00
6,120.00
210,000.00
10,500.00
270,000.00
4,050.00
84,610.00 8,461.00
10%
93,071.00
ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 1SM : 1PP
83,342.60 27,540.00
57,000.00
17,100.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
1,170.00 48,226.00
520.00
36,400.00
177,000.00
3,186.00
210,000.00
3,780.00
270,000.00
4,860.00
75,766.00 7,576.60
10%
83,342.60
ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1KP : 1SM : 2PP
414275883.xlsx
83,685.80 27,540.00
57,000.00 432/227
17,100.00 abk 4-14
RAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 84,000.00
8,400.00
87,000.00
870.00
78,000.00
1,170.00 48,538.00
520.00
36,400.00
177,000.00
2,478.00
210,000.00
5,880.00
270,000.00
3,780.00
76,078.00 7,607.80
10%
83,685.80
/CB 10, speci camp. 1SP : 3PP
414275883.xlsx
195,137.36 27,540.00 57,000.00
17,100.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
1,170.00 149,857.60
432/228
4,000.00
50,000.00
1,360.00
20,617.60
210,000.00
76,440.00
10,000.00
2,800.00
abk 4-14
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
RAIAN PEKERJAAN
177,397.60 17,739.76
10%
195,137.36
/CB 10, speci camp. 1SP : 4PP
196,148.48 27,540.00 57,000.00
17,100.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
1,170.00 150,776.80
4,000.00
50,000.00
1,360.00
16,496.80
210,000.00
81,480.00
10,000.00
2,800.00
178,316.80 17,831.68
10%
196,148.48
awang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 2PP
414275883.xlsx
246,730.00 27,540.00 57,000.00
17,100.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
1,170.00 196,760.00
5,700.00
171,000.00
1,360.00
19,040.00
210,000.00
6,720.00
224,300.00 22,430.00
10% 432/229
abk 4-14
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
RAIAN PEKERJAAN
246,730.00
awang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP
414275883.xlsx
242,935.00 27,540.00 57,000.00
17,100.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
1,170.00 193,310.00
5,700.00
171,000.00
1,360.00
14,960.00
210,000.00
7,350.00
220,850.00 22,085.00
10%
242,935.00
432/230
abk 4-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
V
A.4.4.2 1
KODE
KOEF
1
A,4,4,2.1 L.01 L.02 L.03 L.04
0.3 0.15 0.015 0.015 15.504 0.016
2
1
A,4,4,2.2 L.01 L.02 L.03 L.04
0.3 0.15 0.015 0.015 10.224 0.020
3
1
A,4,4,2.3 L.01 L.02 L.03 L.04
0.3 0.15 0.015 0.015 7.776 0.023
4
414275883.xlsx
1
A,4,4,2.4 L.01 L.02
URAIAN PEKERJAAN
SAT.
0.3 0.15
m2 A OH OH OH OH B Kg m3 C D E F
HARGA SATUAN PEKERJAAN PLESTERAN Pemasangan Plesteran 1 Pc : 1 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%) Pemasangan Plesteran 1 Pc : 2 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH OH OH B Kg m3 C D E F
Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH
Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm Tenaga Pekerja Tukang batu
m2 A OH OH OH OH B Kg m3 C D E F
432/231
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
KODE L.03 L.04
KOEF 0.015 0.015
OH OH B Kg m3 C D E F
Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH OH OH B Kg m3 C D E F
Pemasangan Plesteran 1 Pc : 5 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
1
m2
0.3 0.15 0.015 0.015
OH OH OH OH
4.416 0.027
Kg m3 C D E F
Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
6.240 0.024
5
1
A,4,4,2.5 L.01 L.02 L.03 L.04
0.3 0.15 0.015 0.015 5.184 0.026
6
414275883.xlsx
A,4,4,2.6 L.01 L.02 L.03 L.04
URAIAN PEKERJAAN
SAT.
432/232
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
No. 7
SNI
KODE
KOEF 1
A,4,4,2.7 L.01 L.02 L.03 L.04
0.3 0.15 0.015 0.015 3.936 0.028
8
1
A,4,4,2.8 L.01 L.02 L.03 L.04
0.30 0.15 0.015 0.015 3.456 0.029
9
1
A.4.4.2.9 L.01 L.02 L.03 L.04
0.36 0.12 0.012 0.018 5.760 0.003 0.013
1
10 A,4,4,2.10
414275883.xlsx
L.01 L.02
URAIAN PEKERJAAN
SAT.
0.36 0.12
m2 A OH OH OH OH B Kg m3 C D E F
Pemasangan Plesteran 1 Pc : 7 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH OH OH B Kg m3 C D E F
Pemasangan Plesteran 1 Pc : 8 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH OH OH B Kg m3 m3 C D E F
Pemasangan Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Kapur Pasang Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH
Pemasangan Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm Tenaga Pekerja Tukang batu 432/233
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
KODE L.03 L.04
KOEF 0.012 0.018 3 0.005 0.020
1
11 A,4,4,2.11 L.01 L.02 L.03 L.04
0.36 0.12 0.012 0.018 0.009 0.009 0.009
1
12 A,4,4,2.12
414275883.xlsx
L.01 L.02 L.03 L.04
URAIAN PEKERJAAN
SAT.
0.36 0.12 0.012 0.018 0.007 0.007 0.015
OH OH B kg m3 m3 C D E F
Kepala Tukang Mandor Bahan Portland Semen Kapur Padam Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH OH OH B m3 m3 m3 C D E F
Pemasangan Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Semen Merah Kapur Padam Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH OH OH B m3 m3 m3
Pemasangan Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Semen Merah Kapur Padam Pasir Pasang
432/234
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
KODE
KOEF
C D E F 1
13 A,4,4,2.13 L.01 L.02 L.03 L.04
0.40 0.20 0.020 0.022 13.632 0.027
1
14 A,4,4,2.14 L.01 L.02 L.03 L.04
0.26 0.2 0.02 0.013 10.368 0.031
1
15 A,4,4,2.15 L.01 L.02 L.03 L.04
0.40 0.20 0.020 0.022 8.320 0.032
16 A,4,4,2.16 414275883.xlsx
URAIAN PEKERJAAN
SAT.
1
PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH OH OH B kg m3 C D E F
Pemasangan Plesteran 1 Pc : 2 Pp Tebal 20 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH OH OH B Kg m3 C D E F
Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH OH OH B kg m3 C D E F
Pemasangan Plesteran 1 Pc : 4 Pp Tebal 20 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm 432/235
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
KODE
L.01 L.02 L.03 L.04
KOEF
0.400 0.200 0.020 0.022 6.912 0.035
1
17 A,4,4,2.17 L.01 L.02 L.03 L.04
0.40 0.2 0.02 0.022 5.888 0.036
1
18 A,4,4,2.18
414275883.xlsx
L.01 L.02 L.03 L.04
URAIAN PEKERJAAN
SAT.
0.440 0.22 0.022 0.022
A OH OH OH OH B Kg m3 C D E F
Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH OH OH B Kg m3 C D E F
Pemasangan Plesteran 1Pc : 6Pp Tebal 20 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH OH OH
Pemasangan Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor
432/236
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
KODE
KOEF
B m3 m3 m3 C D E F
Bahan Semen Merah Kapur Padam Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH OH OH B Kg m3 C D E F
Pemasangan Berapen 1 Pc : 5Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m' A OH OH OH OH B Kg m3 C D E F
Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
1
m2
0.30 0.1 0.01 0.015
OH OH OH OH
4.32 0.006
Kg m3 C
Pemasangan Plesteran Ciprat 1Pc : 2 Pp Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN
0.009 0.009 0.018
1
19 A,4,4,2.19 L.01 L.02 L.03 L.04
0.15 0.075 0.008 0.008 5.184 0.026
1
20 A,4,4,2.20 L.01 L.02 L.03 L.04
0.080 0.40 0.040 0.004 0.5 0.013
21 A,4,4,2.23
414275883.xlsx
L.01 L.02 L.03 L.04
URAIAN PEKERJAAN
SAT.
432/237
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
KODE
KOEF
D E F 1
22 A,4,4,2.24 L.01 L.02 L.03 L.04
Pemasangan Finishing Siar Pasangan Dinding Bata Merah ( Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH OH OH B Kg C D E F
Pemasangan Finishing Siar Pasangan Dinding Conblock ek Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
1
m2
0.3 0.15 0.015 0.015
OH OH OH OH
Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp Tenaga Pekerja Tukang batu Kepala Tukang Mandor
0.15 0.075 0.008 0.008
1 L.01 L.02 L.03 L.04
0.070 0.035 0.004 0.004 1.600
24 A,4,4,2.26
414275883.xlsx
L.01 L.02 L.03 L.04
Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
m2 A OH OH OH OH B Kg C D E F
3.108
23 A,4,4,2.25
URAIAN PEKERJAAN
SAT.
432/238
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
KODE
25 A,4,4,2.27
414275883.xlsx
KOEF
URAIAN PEKERJAAN
SAT.
6.34 0.012
Kg m3 C D E F
Bahan Pc PP PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Acian Tenaga
L.01
0.20
OH
Pekerja
L.02
0.10
OH
Tukang batu
L.03
0.010
OH
Kepala Tukang
L.04
0.010
OH
Mandor Bahan
3.25
Kg
Portland Semen
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/239
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
eran 1 Pc : 1 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
56,620.44 5,662.04 62,282.48
10%
eran 1 Pc : 2 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
55,307.60 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00 18,104.64 13,904.64 4,200.00 50,279.64 5,027.96 55,307.60
10%
eran 1 Pc : 3 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
52,338.40 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00 15,405.36 10,575.36 4,830.00 47,580.36 4,758.04 52,338.40
10%
eran 1 Pc : 4 Pp Tebal 15 mm
414275883.xlsx
62,282.48 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00 24,445.44 21,085.44 3,360.00
57,000.00 84,000.00 432/240
50,271.54 32,175.00 17,100.00 12,600.00 abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
87,000.00 78,000.00
1,305.00 1,170.00 13,526.40 8,486.40 5,040.00
1,360.00 210,000.00
45,701.40 4,570.14 50,271.54
10%
eran 1 Pc : 5 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
44,685.24 4,468.52 49,153.76
10%
eran 1 Pc : 6 Pp Tebal 15 mm
414275883.xlsx
49,153.76 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00 12,510.24 7,050.24 5,460.00
57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
48,235.84 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00 11,675.76 6,005.76 5,670.00 43,850.76 4,385.08 48,235.84
10%
432/241
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
eran 1 Pc : 7 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
43,407.96 4,340.80 47,748.76
10%
eran 1 Pc : 8 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
47,261.68 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00 10,790.16 4,700.16 6,090.00 42,965.16 4,296.52 47,261.68
10%
eran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 270,000.00 210,000.00
48,863.76 33,048.00 20,520.00 10,080.00 1,044.00 1,404.00 11,373.60 7,833.60 810.00 2,730.00 44,421.60 4,442.16 48,863.76
10%
eran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm
414275883.xlsx
47,748.76 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00 11,232.96 5,352.96 5,880.00
57,000.00 84,000.00 432/242
46,945.80 33,048.00 20,520.00 10,080.00 abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
87,000.00 78,000.00 1,360.00 270,000.00 210,000.00
42,678.00 4,267.80 46,945.80
10%
eran 1 SM : 1 Kp : 1 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 177,000.00 270,000.00 210,000.00
42,857.10 33,048.00 20,520.00 10,080.00 1,044.00 1,404.00 5,913.00 1,593.00 2,430.00 1,890.00 38,961.00 3,896.10 42,857.10
10%
eran 1 SM : 1 Kp : 2 Pp Tebal 15 mm
414275883.xlsx
1,044.00 1,404.00 9,630.00 4,080.00 1,350.00 4,200.00
57,000.00 84,000.00 87,000.00 78,000.00 177,000.00 270,000.00 210,000.00
432/243
43,259.70 33,048.00 20,520.00 10,080.00 1,044.00 1,404.00 6,279.00 1,239.00 1,890.00 3,150.00
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 39,327.00 3,932.70 43,259.70
10%
eran 1 Pc : 2 Pp Tebal 20 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
67,265.52 6,726.55 73,992.07
10%
eran 1Pc : 3Pp Tebal 20 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
54,984.48 34,374.00 14,820.00 16,800.00 1,740.00 1,014.00 20,610.48 14,100.48 6,510.00 55,998.48 5,599.85 61,598.33
10%
eran 1 Pc : 4 Pp Tebal 20 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
67,200.32 43,056.00 22,800.00 16,800.00 1,740.00 1,716.00 18,035.20 11,315.20 6,720.00 61,091.20 6,109.12 67,200.32
10%
eran 1Pc : 5Pp Tebal 20 mm 414275883.xlsx
73,992.07 43,056.00 22,800.00 16,800.00 1,740.00 1,716.00 24,209.52 18,539.52 5,670.00
65,786.95 432/244
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
59,806.32 5,980.63 65,786.95
10%
eran 1Pc : 6Pp Tebal 20 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
64,486.05 43,056.00 22,800.00 16,800.00 1,740.00 1,716.00 15,567.68 8,007.68 7,560.00 58,623.68 5,862.37 64,486.05
10%
eran 1 SM : 2 Kp : 2 Pp Tebal 20 mm
414275883.xlsx
43,056.00 22,800.00 16,800.00 1,740.00 1,716.00 16,750.32 9,400.32 7,350.00
57,000.00 84,000.00 87,000.00 78,000.00
432/245
60,492.30 47,190.00 25,080.00 18,480.00 1,914.00 1,716.00
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
177,000.00 270,000.00 210,000.00
54,993.00 5,499.30 60,492.30
10%
en 1 Pc : 5Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
31,548.26 16,170.00 8,550.00 6,300.00 696.00 624.00 12,510.24 7,050.24 5,460.00 28,680.24 2,868.02 31,548.26
10%
eran Skoning 1 Pc : 2Pp, lebar 10 mm
414275883.xlsx
7,803.00 1,593.00 2,430.00 3,780.00
57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
49,898.20 41,952.00 4,560.00 33,600.00 3,480.00 312.00 3,410.00 680.00 2,730.00 45,362.00 4,536.20 49,898.20
10%
57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00
432/246
38,142.72 27,540.00 17,100.00 8,400.00 870.00 1,170.00 7,135.20 5,875.20 1,260.00
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
URAIAN PEKERJAAN
34,675.20 3,467.52 38,142.72
10%
hing Siar Pasangan Dinding Bata Merah (=20 m') 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00
20,396.88 2,039.69 22,436.57
10%
hing Siar Pasangan Dinding Conblock ekspose (=8 m') 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00
10,742.60 7,590.00 3,990.00 2,940.00 348.00 312.00 2,176.00 2,176.00 9,766.00 976.60 10,742.60
10%
hing Siar Pas.Batu Kali Adukan 1Pc : 2Pp
414275883.xlsx
22,436.57 16,170.00 8,550.00 6,300.00 696.00 624.00 4,226.88 4,226.88
57,000.00 84,000.00 87,000.00 78,000.00
432/247
47,649.14 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
URAIAN PEKERJAAN
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
1,360.00 210,000.00
11,142.40 8,622.40 2,520.00 43,317.40 4,331.74 47,649.14
10%
28,457.00 21,450.00 57,000.00
11,400.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
780.00 4,420.00
1,360.00
4,420.00 25,870.00 2,587.00
10%
28,457.00
432/248
abk 5-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
VI
A.4.6.1
1
A.4.6.1.1
2
KODE
KOEF
URAIAN PEKERJAAN
SAT.
HARGA SATUAN PEKERJAAN 1
m3
Pembuatan & Pemasangan Kosen Pintu & Jendela Ka
A
Tenaga
L.01
7
OH
Pekerja
L.02
21
OH
Tukang Kayu
L.03
2.10
OH
Kepala Tukang
L.04
0.35
OH
Mandor
B
Bahan
A.4.6.1.2
1.1
m3
Kayu Klas I (Jati) , Balok
1.25
kg
Paku Biasa 2" - 5 "
1
kg
Lem Kayu
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m3
K A Y U
Pembuatan & Pemasangan Kosen Pintu & Jendela Ka Tenaga
L.01
6.00
OH
Pekerja
L.02
18.00
OH
Tukang Kayu
L.03
1.80
OH
Kepala Tukang
L.04
0.30
OH
Mandor Bahan
3
A.4.6.1.3
1.2
m3
Kayu Klas II (Kamfer) , Balok
1.25
kg
Paku Biasa 2" - 5 "
1
kg
Lem Kayu
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
Pembuatan & Pemasangan Pintu KlampStandard Kayu
A
Tenaga
L.01
0.35
OH
Pekerja
L.02
1.05
OH
Tukang Kayu
L.03
0.105
OH
Kepala Tukang
L.04
0.018
OH
Mandor
B
Bahan
0.040 414275883.xlsx
m2
m3
Kayu Klas II (Kamfer), papan
432/249
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
KODE
KOEF 0.05
4
A.4.6.1.4
URAIAN PEKERJAAN
SAT.
1
Kg
Paku Biasa 2" - 5 "
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pembuatan & Pemasangan Daun Pintu Klamp Sederha Tenaga
L.01
0.35
OH
Pekerja
L.02
1.05
OH
Tukang Kayu
L.03
0.105
OH
Kepala Tukang
L.04
0.018
OH
Mandor Bahan
5
A.4.6.1.5
414275883.xlsx
0.040
m3
Kayu Klas II (Kamfer), papan
0.05
Kg
Paku Biasa 2" - 5 "
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pembuatan & Pemasangan Daun Pintu Panel, Kayu Kl
A
Tenaga
L.01
1.00
OH
Pekerja
L.02
3.00
OH
Tukang Kayu
L.03
0.30
OH
Kepala Tukang
L.04
0.05
OH
Mandor
B
Bahan
0.04
m3
Kayu Klas II (Kamfer), papan
0.050
kg
Lem Kayu
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/250
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
6
A.4.6.1.6
7
8
KODE
URAIAN PEKERJAAN
SAT. 1
m2
Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu
A
Tenaga
L.01
0.800
OH
Pekerja
L.02
2.400
OH
Tukang Kayu
L.03
0.240
OH
Kepala Tukang
L.04
0.040
OH
Mandor
B
Bahan
A.4.6.1.7
0.024
m3
Kayu Klas II (Kamfer), papan
0.300
kg
Lem Kayu
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pembuatan & Pemasangan Pintu & Jendela Jalusi Kay
A
Tenaga
L.01
1
OH
Pekerja
L.02
3
OH
Tukang Kayu
L.03
0.3
OH
Kepala Tukang
L.04
0.05
OH
Mandor
B
Bahan
A.4.6.1.8
414275883.xlsx
KOEF
0.064
m3
Kayu Klas I (Jati), papan
0.5
kg
Lem Kayu
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangk
A
Tenaga
L.01
0.700
OH
Pekerja
L.02
2.100
OH
Tukang Kayu
L.03
0.210
OH
Kepala Tukang
L.04
0.035
OH
Mandor
B
Bahan
0.025
m3
Kayu Klas II (Kamfer), papan
0.030
Kg
Paku Biasa 1/2" - 1"
0.500
Ltr
Lem Kayu
1.000
Lbr
Plywood tebal 4 mm uk.90x220cm
432/251
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
9
10
SNI
KODE
A.4.6.1.9
URAIAN PEKERJAAN
SAT.
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pembuatan&Pemasangan Pintu Plywood rangkap, ran
A
Tenaga
L.01
0.800
OH
Pekerja
L.02
2.400
OH
Tukang Kayu
L.03
0.240
OH
Kepala Tukang
L.04
0.040
OH
Mandor
B
Bahan
A.4.6.1.10
414275883.xlsx
KOEF
0.0256
m3
Kayu Klas II (Kamfer), papan
0.03
Kg
Paku Biasa 1/2" - 1"
0.5
Ltr
Lem Kayu
1
Lbr
Plywood tebal 4 mm uk.90x220cm
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pembuatan & Pemasangan Jalusi mati Kosen Kayu Kl
A
Tenaga
L.01
0.670
OH
Pekerja
L.02
2.000
OH
Tukang Kayu
L.03
0.200
OH
Kepala Tukang
L.04
0.335
OH
Mandor
B
Bahan
0.06
m3
Kayu Klas I (Jati), papan
0.15
Kg
Paku Biasa 1/2" - 1"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/252
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
11
A.4.6.1.11
12
13
KODE
URAIAN PEKERJAAN
SAT. 1
m2
Pembuatan & Pemasangan Pintu Teakwood Rangkap,
A
Tenaga
L.01
0.80
OH
Pekerja
L.02
2.40
OH
Tukang Kayu
L.03
0.24
OH
Kepala Tukang
L.04
0.04
OH
Mandor
B
Bahan
A.4.6.1.12
0.025
m3
Kayu Klas I (Jati), papan
0.03
Kg
Paku Biasa 1/2" - 1"
0.3
kg
Lem Kayu
1
Lbr
Teakwood (90 x 220) cm x 4 mm
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pembuatan&Pemasangan Pintu Teakwood Rangkap Lapis F
A
Tenaga
L.01
0.850
OH
Pekerja
L.02
2.550
OH
Tukang Kayu
L.03
0.255
OH
Kepala Tukang
L.04
0.043
OH
Mandor
B
Bahan
A.4.6.1.13
414275883.xlsx
KOEF
0.025
m3
Kayu Klas II (Kamfer), papan
0.03
Kg
Paku Biasa 1/2" - 1"
0.08
kg
Lem Kayu
1
Lbr
Teakwood (90 x 220) cm x 4 mm
0.5
Lbr
Formika
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m3
Pembuatan&Memasang Konstruksi Kuda-kuda Konven
A
Tenaga
L.01
4
OH
Pekerja
L.02
12
OH
Tukang Kayu
L.03
1.2
OH
Kepala Tukang
L.04
0.2
OH
Mandor
432/253
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
KODE
KOEF
B
14
15
A.4.6.1.14
Bahan
1.1
m3
Kayu Kamfer, balok
15
Kg
Besi Strip
5.6
Kg
Paku Biasa 2" - 5"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m3
Pembuatan&Pemasangan Konstruksi Kuda-kuda Expo
A
Tenaga
L.01
6.7
OH
Pekerja
L.02
20.1
OH
Tukang Kayu
L.03
2.01
OH
Kepala Tukang
L.04
0.335
OH
Mandor
B
Bahan
A.4.6.1.15
414275883.xlsx
URAIAN PEKERJAAN
SAT.
1.2
m3
Kayu Klas I (jati), balok
15
Kg
Besi Strip
5.6
Kg
Paku Biasa 2" - 5"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m3
Pemasangan konstruksi Gording, Kayu Klas II
A
Tenaga
L.01
2.4
OH
Pekerja
L.02
7.2
OH
Tukang Kayu
L.03
0.72
OH
Kepala Tukang
L.04
0.12
OH
Mandor
B
Bahan
1.1
m3
Kayu Klas I (Kamfer), balok
15
Kg
Besi Strip
3
Kg
Paku Biasa 2" - 5"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/254
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
16
A.4.6.1.16
17
18
KODE
KOEF
1
m2
Pemasangan Rangka Atap Genteng Keramik, Kayu Kla
A
Tenaga
L.01
0.1
OH
Pekerja
L.02
0.1
OH
Tukang Kayu
L.03
0.01
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
A.4.6.1.17
0.014
m3
Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm
0.0036
m3
Reng (2x3) cm
0.25
Kg
Paku Biasa 2" - 5"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Rangka Atap Genteng Beton, Kayu Klas
A
Tenaga
L.01
0.1
OH
Pekerja
L.02
0.1
OH
Tukang Kayu
L.03
0.01
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
A.4.6.1.18
0.014
m3
Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm
0.0072
m3
Reng (2x3) cm
0.25
Kg
Paku Biasa 2" - 5"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Rangka Atap Sirap, Kayu Klas II
A
Tenaga
L.01
0.12
OH
Pekerja
L.02
0.12
OH
Tukang Kayu
L.03
0.012
OH
Kepala Tukang
L.04
0.006
OH
Mandor
B
Bahan
0.014 414275883.xlsx
URAIAN PEKERJAAN
SAT.
m3
Kayu Klas II (Kamfer), balok
432/255
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
KODE
KOEF 0.2
19
20
A.4.6.1.19
1
Kg
Paku Biasa 2" - 5"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Rangka Langit-langit (50x1,00) m, kayu K
A
Tenaga
L.01
0.15
OH
Pekerja
L.02
0.30
OH
Tukang Kayu
L.03
0.030
OH
Kepala Tukang
L.04
0.075
OH
Mandor
B
Bahan
A.4.6.1.20
414275883.xlsx
URAIAN PEKERJAAN
SAT.
0.0154
m3
Kayu Klas II (Kamfer), balok
0.2
Kg
Paku Biasa 2" - 5"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Rangka Langit-langit (60x60) cm, kayu K
A
Tenaga
L.01
0.2
OH
Pekerja
L.02
0.3
OH
Tukang Kayu
L.03
0.03
OH
Kepala Tukang
L.04
0.01
OH
Mandor
B
Bahan
0.0163
m3
Kayu Klas II (Kamfer), balok
0.25
Kg
Paku Biasa 2" - 5"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/256
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
21
A.4.6.1.21
22
23
KODE
URAIAN PEKERJAAN
SAT. 1
m'
Pemasangan Listplank Uk. (3x20)cm Kayu klas I atau I
A
Tenaga
L.01
0.1
OH
Pekerja
L.02
0.2
OH
Tukang Kayu
L.03
0.020
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
A.4.6.1.22
0.0108
m3
Kayu klas I (Jati), papan
0.10
Kg
Paku Biasa 2" - 5"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau k
A
Tenaga
1 L.01
0.1
OH
Pekerja
L.02
0.2
OH
Tukang Kayu
L.03
0.02
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
A.4.6.1.23
414275883.xlsx
KOEF
0.011
m3
Kayu klas II (Kamfer), papan
0.05
Kg
Paku Biasa 2" - 5"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Rangka Dinding Pemisah (60x120) cm K
A
Tenaga
L.01
0.15
OH
Pekerja
L.02
0.45
OH
Tukang Kayu
L.03
0.045
OH
Kepala Tukang
L.04
0.008
OH
Mandor
B
Bahan
0.028
m3
Kayu klas II (Kamfer), balok
0.15
Kg
Paku Biasa 2" - 5"
C
PERALATAN
D
Jumlah A + B + C
432/257
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
24
25
SNI
KODE
A.4.6.1.24
URAIAN PEKERJAAN
SAT.
1
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Dinding Pemisah Teakwood Rangkap Ra
A
Tenaga
L.01
0.15
OH
Pekerja
L.02
0.45
OH
Tukang Kayu
L.03
0.045
OH
Kepala Tukang
L.04
0.008
OH
Mandor
B
Bahan
A.4.6.1.25
414275883.xlsx
KOEF
0.028
m3
Kayu klas II (Kamfer), balok
0.15
Kg
Paku Biasa 2" - 5"
0.86
Lbr
Teakwood 120 x 240 cm tebal 4mm
0.56
Ltr
Lem
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding Pemisah Plywood Rangkap Ran
A
Tenaga
L.01
0.020
OH
Pekerja
L.02
0.600
OH
Tukang Kayu
L.03
0.060
OH
Kepala Tukang
L.04
0.010
OH
Mandor
B
Bahan
0.028
m3
Kayu klas II (Kamfer), balok
0.15
Kg
Paku Biasa 2" - 5"
0.86
Lbr
Plywood 120 x 240 cm tebal 4mm
0.56
Ltr
Lem
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/258
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
26
A.4.6.1.26
27
28
KODE
URAIAN PEKERJAAN
SAT. 1
m2
Pemasangan Dinding Lambriziring dari Papan klas I
A
Tenaga
L.01
0.6
OH
Pekerja
L.02
1.8
OH
Tukang Kayu
L.03
0.18
OH
Kepala Tukang
L.04
0.03
OH
Mandor
B
Bahan
A.4.6.1.27
0.007
m3
Kayu klas I (Jati), papan
0.1
Kg
Paku Biasa 2" - 5"
0.15
Kg
Paku Sekrup 3,5"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding Lambriziring dari Plywood ukur
A
Tenaga
L.01
0.025
OH
Pekerja
L.02
0.075
OH
Tukang Kayu
L.03
0.0080
OH
Kepala Tukang
L.04
0.0010
OH
Mandor
B
Bahan
A.4.6.1.28
414275883.xlsx
KOEF
0.4
Lbr
Plywood (120 X 240) cm x 4mm
0.05
Kg
Paku Biasa 1/2" - 1"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding Bilik, Rangka Kayu Klas III atau I
A
Tenaga
L.01
0.1
OH
Pekerja
L.02
0.05
OH
Tukang Kayu
L.03
0.005
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
1.500
m2
Bilik Bambu
0.014
m3
Kayu Klas III (Meranti)
0.012
Kg
Paku Biasa 1/2" - 1"
432/259
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
No.
SNI
KODE
KOEF 0.003
414275883.xlsx
URAIAN PEKERJAAN
SAT. m'
List Kayu 2/4
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/260
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
URAIAN PEKERJAAN
masangan Kosen Pintu & Jendela Kayu klas I
26,851,000.00 2,373,000.00 57,000.00
399,000.00
84,000.00
1,764,000.00
87,000.00
182,700.00
78,000.00
27,300.00 22,037,000.00
20,000,000.00
22,000,000.00
14,000.00
17,500.00
19,500.00
19,500.00 24,410,000.00 2,441,000.00
10%
26,851,000.00
masangan Kosen Pintu & Jendela Kayu klas II atau III
11,518,100.00 2,034,000.00 57,000.00
342,000.00
84,000.00
1,512,000.00
87,000.00
156,600.00
78,000.00
23,400.00 8,437,000.00
7,000,000.00
8,400,000.00
14,000.00
17,500.00
19,500.00
19,500.00 10,471,000.00 1,047,100.00
10%
11,518,100.00
masangan Pintu KlampStandard Kayu Klas II (Kayu Kamfer)
465,727.90 118,689.00 57,000.00
19,950.00
84,000.00
88,200.00
87,000.00
9,135.00
78,000.00
1,404.00 304,700.00
7,600,000.00 414275883.xlsx
432/261
304,000.00 abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
URAIAN PEKERJAAN
14,000.00
700.00 423,389.00 42,338.90
10%
465,727.90
masangan Daun Pintu Klamp Sederhana Kayu Klas III
465,727.90 118,689.00 57,000.00
19,950.00
84,000.00
88,200.00
87,000.00
9,135.00
78,000.00
1,404.00 304,700.00
7,600,000.00
304,000.00
14,000.00
700.00 423,389.00 42,338.90
10%
465,727.90
masangan Daun Pintu Panel, Kayu Klas I atau II
708,372.50 339,000.00 57,000.00
57,000.00
84,000.00
252,000.00
87,000.00
26,100.00
78,000.00
3,900.00 304,975.00
7,600,000.00
304,000.00
19,500.00
975.00 643,975.00 64,397.50
10%
708,372.50
414275883.xlsx
432/262
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
URAIAN PEKERJAAN
masangan Pintu & Jendela Kaca Kayu Klas I atau II
505,395.00 271,200.00 57,000.00
45,600.00
84,000.00
201,600.00
87,000.00
20,880.00
78,000.00
3,120.00 188,250.00
7,600,000.00
182,400.00
19,500.00
5,850.00 459,450.00 45,945.00
10%
505,395.00
masangan Pintu & Jendela Jalusi Kayu Klas I atau II (jati)
1,932,425.00 339,000.00 57,000.00
57,000.00
84,000.00
252,000.00
87,000.00
26,100.00
78,000.00
3,900.00 1,417,750.00
22,000,000.00
1,408,000.00
19,500.00
9,750.00 1,756,750.00 175,675.00
10%
1,932,425.00
angan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 c
553,817.00 237,300.00
57,000.00
39,900.00
84,000.00
176,400.00
87,000.00
18,270.00
78,000.00
2,730.00 266,170.00
414275883.xlsx
7,600,000.00
190,000.00
14,000.00
420.00
19,500.00
9,750.00
66,000.00
66,000.00
432/263
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
503,470.00 50,347.00
10%
553,817.00
asangan Pintu Plywood rangkap, rangka expose kayu klas I atau II
596,123.00 271,200.00
57,000.00
45,600.00
84,000.00
201,600.00
87,000.00
20,880.00
78,000.00
3,120.00 270,730.00
7,600,000.00
194,560.00
14,000.00
420.00
19,500.00
9,750.00
66,000.00
66,000.00 541,930.00 54,193.00
10%
596,123.00
masangan Jalusi mati Kosen Kayu Klas I atau II
1,729,002.00 249,720.00 57,000.00
38,190.00
84,000.00
168,000.00
87,000.00
17,400.00
78,000.00
26,130.00 1,322,100.00
22,000,000.00
1,320,000.00
14,000.00
2,100.00 1,571,820.00 157,182.00
10%
1,729,002.00
414275883.xlsx
432/264
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
masangan Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I
982,817.00 271,200.00
57,000.00
45,600.00
84,000.00
201,600.00
87,000.00
20,880.00
78,000.00
3,120.00 622,270.00
22,000,000.00
550,000.00
14,000.00
420.00
19,500.00
5,850.00
66,000.00
66,000.00 893,470.00 89,347.00
10%
982,817.00
angan Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II
639,285.90 288,189.00
57,000.00
48,450.00
84,000.00
214,200.00
87,000.00
22,185.00
78,000.00
3,354.00 292,980.00
7,600,000.00
190,000.00
14,000.00
420.00
19,500.00
1,560.00
66,000.00
66,000.00
70,000.00
35,000.00 581,169.00 58,116.90
10%
639,285.90
asang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6
10,254,090.00 1,356,000.00
414275883.xlsx
57,000.00
228,000.00
84,000.00
1,008,000.00
87,000.00
104,400.00
78,000.00
15,600.00
432/265
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 7,965,900.00
7,000,000.00
7,700,000.00
12,500.00
187,500.00
14,000.00
78,400.00 9,321,900.00 932,190.00
10%
10,254,090.00
asangan Konstruksi Kuda-kuda Expose, Kayu Klas I
29,190,920.00 2,271,300.00 57,000.00
381,900.00
84,000.00
1,688,400.00
87,000.00
174,870.00
78,000.00
26,130.00 24,265,900.00
20,000,000.00
24,000,000.00
12,500.00
187,500.00
14,000.00
78,400.00 26,537,200.00 2,653,720.00
10%
29,190,920.00
struksi Gording, Kayu Klas II
9,617,410.00 813,600.00 57,000.00
136,800.00
84,000.00
604,800.00
87,000.00
62,640.00
78,000.00
9,360.00 7,929,500.00
7,000,000.00
7,700,000.00
12,500.00
187,500.00
14,000.00
42,000.00 8,743,100.00 874,310.00
10%
9,617,410.00
414275883.xlsx
432/266
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
gka Atap Genteng Keramik, Kayu Klas II
156,266.00 15,360.00 57,000.00
5,700.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
390.00 126,700.00
7,000,000.00
98,000.00
7,000,000.00
25,200.00
14,000.00
3,500.00 142,060.00 14,206.00
10%
156,266.00
gka Atap Genteng Beton, Kayu Klas II
183,986.00 15,360.00 57,000.00
5,700.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
390.00 151,900.00
7,000,000.00
98,000.00
7,000,000.00
50,400.00
14,000.00
3,500.00 167,260.00 16,726.00
10%
183,986.00
gka Atap Sirap, Kayu Klas II
131,155.20 18,432.00 57,000.00
6,840.00
84,000.00
10,080.00
87,000.00
1,044.00
78,000.00
468.00 100,800.00
7,000,000.00 414275883.xlsx
432/267
98,000.00 abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
14,000.00
2,800.00 119,232.00 11,923.20
10%
131,155.20
gka Langit-langit (50x1,00) m, kayu Klas II atau III
168,091.00 42,210.00 57,000.00
8,550.00
84,000.00
25,200.00
87,000.00
2,610.00
78,000.00
5,850.00 110,600.00
7,000,000.00
107,800.00
14,000.00
2,800.00 152,810.00 15,281.00
10%
168,091.00
gka Langit-langit (60x60) cm, kayu Klas II atau III
173,349.00 39,990.00 57,000.00
11,400.00
84,000.00
25,200.00
87,000.00
2,610.00
78,000.00
780.00 117,600.00
7,000,000.00
114,100.00
14,000.00
3,500.00 157,590.00 15,759.00
10%
173,349.00
414275883.xlsx
432/268
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
URAIAN PEKERJAAN
plank Uk. (3x20)cm Kayu klas I atau II
289,993.00 24,630.00 57,000.00
5,700.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
390.00 239,000.00
22,000,000.00
237,600.00
14,000.00
1,400.00 263,630.00 26,363.00
10%
289,993.00
plank Uk. (3x30)cm Kayu klas I atau klas II
119,823.00 24,630.00 57,000.00
5,700.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
390.00 84,300.00
7,600,000.00
83,600.00
14,000.00
700.00 108,930.00 10,893.00
10%
119,823.00
gka Dinding Pemisah (60x120) cm Kayu klas II atau III
273,887.90 50,889.00 57,000.00
8,550.00
84,000.00
37,800.00
87,000.00
3,915.00
78,000.00
624.00 198,100.00
7,000,000.00
196,000.00
14,000.00
2,100.00 248,989.00
414275883.xlsx
432/269
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
URAIAN PEKERJAAN
24,898.90
10%
273,887.90
ding Pemisah Teakwood Rangkap Rangka Kayu Klas II
348,335.90 50,889.00 57,000.00
8,550.00
84,000.00
37,800.00
87,000.00
3,915.00
78,000.00
624.00 265,780.00
7,000,000.00
196,000.00
14,000.00
2,100.00
66,000.00
56,760.00
19,500.00
10,920.00 316,669.00 31,666.90
10%
348,335.90
ding Pemisah Plywood Rangkap Rangka Kayu Klas II
355,652.00 57,540.00 57,000.00
1,140.00
84,000.00
50,400.00
87,000.00
5,220.00
78,000.00
780.00 265,780.00
7,000,000.00
196,000.00
14,000.00
2,100.00
66,000.00
56,760.00
19,500.00
10,920.00 323,320.00 32,332.00
10%
355,652.00
414275883.xlsx
432/270
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
URAIAN PEKERJAAN
ding Lambriziring dari Papan klas I
395,917.50 203,400.00 57,000.00
34,200.00
84,000.00
151,200.00
87,000.00
15,660.00
78,000.00
2,340.00 156,525.00
22,000,000.00
154,000.00
14,000.00
1,400.00
7,500.00
1,125.00 359,925.00 35,992.50
10%
395,917.50
ding Lambriziring dari Plywood ukuran (120x240) cm
37,838.90 8,499.00 57,000.00
1,425.00
84,000.00
6,300.00
87,000.00
696.00
78,000.00
78.00 25,900.00
63,000.00
25,200.00
14,000.00
700.00 34,399.00 3,439.90
10%
37,838.90
ding Bilik, Rangka Kayu Klas III atau IV
120,458.14 10,725.00 57,000.00
5,700.00
84,000.00
4,200.00
87,000.00
435.00
78,000.00
390.00 98,782.40
414275883.xlsx
20,000.00
30,000.00
4,900,000.00
68,600.00
14,000.00
168.00
432/271
abk 6-14
file:///conversion/tmp/scratch/414275883.xlsx
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
4,800.00
14.40 109,507.40 10,950.74
10%
120,458.14
414275883.xlsx
432/272
abk 6-14
No.
SNI
VII
A.4.1.1
1
A.4.1.1.1
KODE
3
1
m3 A
Tenaga
1.65
OH
Pekerja
L.02
0.275
OH
Tukang Batu
L.03
0.028
OH
Kepala Tukang
L.04
0.083
OH
Mandor
B
Bahan
247
Kg
Portland Semen
869
Kg
Pasir Beton
999
Kg
Kerikil (maksimum 30 mm)
215
ltr
Air
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m3 A
Tenaga
1.65
OH
Pekerja
L.02
0.28
OH
Tukang Batu
L.03
0.03
OH
Kepala Tukang
L.04
0.08
OH
Mandor
B
Bahan
276
Kg
Portland Semen
828
kg
Pasir Beton
1,012
kg
Kerikil (maksimum 30 mm)
215
ltr
Air
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m3
10%
Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78
L.01
1.00
BETON
Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87
L.01
A.4.1.1.3
414275883.xlsx
URAIAN PEKERJAAN
SAT.
HARGA SATUAN PEKERJAAN
A.4.1.1.2
2
KOEF
10%
Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72
A
Tenaga
L.01
1.65
OH
Pekerja
L.02
0.28
OH
Tukang Batu
L.03
0.03
OH
Kepala Tukang
L.04
0.08
OH
Mandor
B
Bahan
299
Kg
Portland Semen
799
kg
Pasir Beton 432/273
abk 7-14
No.
4
5
SNI
KODE
A.4.1.1.4
URAIAN PEKERJAAN
SAT.
1,017
kg
Kerikil (maksimum 30 mm)
215
ltr
Air
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1.00
m3 A
Tenaga
1.200
OH
Pekerja
L.02
0.200
OH
Tukang Batu
L.03
0.020
OH
Kepala Tukang
L.04
0.006
OH
Mandor
B
Bahan
230
Kg
Portland Semen
893
kg
Pasir Beton
1,027
kg
Kerikil (maksimum 30 mm)
200
ltr
Air
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m3
10%
Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm,
L.01
A.4.1.1.5
414275883.xlsx
KOEF
10%
Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
A
Tenaga
L.01
1.65
OH
Pekerja
L.02
0.275
OH
Tukang Batu
L.03
0.028
OH
Kepala Tukang
L.04
0.083
OH
Mandor
B
Bahan
326
Kg
Portland Semen
760
Kg
Pasir Beton
1,029
Kg
Kerikil (maksimum 30 mm)
215
ltr
Air
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/274
10%
abk 7-14
No.
SNI
6
A.4.1.1.6
7
8
KODE
1
SAT.
URAIAN PEKERJAAN
m3
Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61
A
Tenaga
L.01
1.650
OH
Pekerja
L.02
0.275
OH
Tukang Batu
L.03
0.028
OH
Kepala Tukang
L.04
0.083
OH
Mandor
B
Bahan
352
Kg
Portland Semen
731
Kg
Pasir Beton
1,031
Kg
Kerikil (maksimum 30 mm)
215
ltr
Air
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.4.1.1.7
1
m3 A
Tenaga
1.650
OH
Pekerja
L.02
0.275
OH
Tukang Batu
L.03
0.028
OH
Kepala Tukang
L.04
0.083
OH
Mandor
B
Bahan
371
Kg
Portland Semen
698
Kg
Pasir Beton
1,047
Kg
Kerikil (maksimum 30 mm)
215
ltr
Air
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m3
10%
Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
A
Tenaga
L.01
1.650
OH
Pekerja
L.02
0.275
OH
Tukang Batu
L.03
0.028
OH
Kepala Tukang
L.04
0.083
OH
Mandor
B
Bahan
Kg
Portland Semen
384
10%
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
L.01
A.4.1.1.8
414275883.xlsx
KOEF
432/275
abk 7-14
No.
9
10
SNI
KODE
A.4.1.1.9
URAIAN PEKERJAAN
SAT.
692
Kg
Pasir Beton
1,039
Kg
Kerikil (maksimum 30 mm)
215
ltr
Air
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m3 A
Tenaga
1.650
OH
Pekerja
L.02
0.275
OH
Tukang Batu
L.03
0.028
OH
Kepala Tukang
L.04
0.083
OH
Mandor
B
Bahan
406
Kg
Portland Semen
684
kg
Pasir Beton
1,026
kg
Kerikil (maksimum 30 mm)
215
ltr
Air
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m3
10%
Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)c
L.01
A.4.1.1.10
414275883.xlsx
KOEF
10%
Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52
A
Tenaga
L.01
1.650
OH
Pekerja
L.02
0.275
OH
Tukang Batu
L.03
0.028
OH
Kepala Tukang
L.04
0.083
OH
Mandor
B
Bahan
413
Kg
Portland Semen
681
Kg
Pasir Beton
1,021
Kg
Kerikil (maksimum 30 mm)
215
ltr
Air
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/276
10%
abk 7-14
No.
SNI
11
A.4.1.1.11
12
13
KODE
1
SAT.
URAIAN PEKERJAAN
m3
Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49
A
Tenaga
L.01
2.1
OH
Pekerja
L.02
0.35
OH
Tukang Batu
L.03
0.035
OH
Kepala Tukang
L.04
0.105
OH
Mandor
B
Bahan
439
Kg
Portland Semen
670
Kg
Pasir Beton
1,006
Kg
Kerikil (maksimum 30 mm)
215
ltr
Air
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.4.1.1.12
1
m3 A
Tenaga
2.10
OH
Pekerja
L.02
0.350
OH
Tukang Batu
L.03
0.035
OH
Kepala Tukang
L.04
0.105
OH
Mandor
B
Bahan
448
Kg
Portland Semen
667
Kg
Pasir Beton
1,000
Kg
Kerikil (maksimum 30 mm)
215
ltr
Air
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
10
Kg
10%
Pembesian dg Besi Polos atau Besi Ulir
A
Tenaga
L.01
0.07
OH
Pekerja
L.02
0.07
OH
Tukang Besi
L.03
0.007
OH
Kepala Tukang
L.04
0.004
OH
Mandor
B
Bahan
Kg
Besi Beton (polos/ulir)
10.50
10%
Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48
L.01
A.4.1.1.17
414275883.xlsx
KOEF
432/277
abk 7-14
No.
SNI
KODE
KOEF 0.150
14
15
16
A.4.1.1.18
10
Kg
Kawat Beton
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
Kg A
Tenaga
0.05
OH
Pekerja
L.02
0.05
OH
Tukang Besi
L.03
0.005
OH
Kepala Tukang
L.04
0.003
OH
Mandor
B
Bahan
10.5
Kg
Besi presstred polos
0.1
Kg
Kawat Beton
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
Kg
Jaring Kawat baja/Wire Mesh
10
A
Tenaga
L.01
0.025
OH
Pekerja
L.02
0.025
OH
Tukang Besi
L.03
0.002
OH
Kepala Tukang
L.04
0.001
OH
Mandor
B
Bahan
10.20
Kg
Jaring Kawat Baja dilas
0.05
Kg
Kawat Beton
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.4.1.1.20
1
m2
10%
Kabel Presstresed Polos/strand
L.01
A.4.1.1.19
414275883.xlsx
URAIAN PEKERJAAN
SAT.
10%
10%
Memasang Bekisting untuk Pondasi
A
Tenaga
L.01
0.52
OH
Pekerja
L.02
0.26
OH
Tukang Kayu
432/278
abk 7-14
No.
17
18
SNI
KODE
URAIAN PEKERJAAN
SAT.
L.03
0.026
OH
Kepala Tukang
L.04
0.026
OH
Mandor
B
Bahan
A.4.1.1.21
0.04
m3
Kayu Klas III (Terentang)
0.3
Kg
Paku Biasa 2" - 5"
0.1
Ltr
Minyak Bekisting
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2 A
Tenaga
0.52
OH
Pekerja
L.02
0.26
OH
Tukang Kayu
L.03
0.026
OH
Kepala Tukang
L.04
0.026
OH
Mandor
B
Bahan
0.045
m3
Kayu Klas III (Terentang)
0.3
Kg
Paku Biasa 2" - 5"
0.1
Ltr
Minyak Bekisting
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
10%
Memasang Bekisting untuk Kolom
A
Tenaga
L.01
0.66
OH
Pekerja
L.02
0.33
OH
Tukang Kayu
L.03
0.033
OH
Kepala Tukang
L.04
0.033
OH
Mandor
B
Bahan
0.04
m3
Kayu Klas III (Terentang)
0.4
Kg
Paku Biasa 2" - 5"
0.2
Ltr
Minyak Bekisting
0.015
m3
Balok Kayu Klas II
0.35
Lbr
Plywood tebal 9mm
2
Btg
Dolken Kayu Galam diameter 8 - 10 cm / 4 m
C
10%
Memasang Bekisting untuk Sloof
L.01
A.4.1.1.22
414275883.xlsx
KOEF
PERALATAN 432/279
abk 7-14
No.
19
20
SNI
KODE
A.4.1.1.23
URAIAN PEKERJAAN
SAT.
1
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2 A
Tenaga
0.66
OH
Pekerja
L.02
0.33
OH
Tukang Kayu
L.03
0.033
OH
Kepala Tukang
L.04
0.033
OH
Mandor
B
Bahan
0.04
m3
Kayu Klas III (Terentang)
0.4
Kg
Paku Biasa 2" - 5"
0.2
Ltr
Minyak Bekisting
0.018
m3
Balok Kayu Klas II
0.35
Lbr
Plywood tebal 9mm
2
Btg
Dolken Kayu Galam diameter 8 - 10 cm / 4 m
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
10%
Memasang Bekisting untuk Balok
L.01
A.4.1.1.24
414275883.xlsx
KOEF
10%
Memasang Bekisting untuk Lantai
A
Tenaga
L.01
0.66
OH
Pekerja
L.02
0.33
OH
Tukang Kayu
L.03
0.033
OH
Kepala Tukang
L.04
0.033
OH
Mandor
B
Bahan
0.04
m3
Kayu Klas III (Terentang)
0.4
Kg
Paku Biasa 2" - 5"
0.2
Ltr
Minyak Bekisting
0.015
m3
Balok Kayu Klas II (Borneo)
0.35
Lbr
Plywood tebal 9mm
6
Btg
Dolken Kayu Galam diameter 8 - 10 cm / 4 m
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
432/280
10%
abk 7-14
No.
SNI
KODE
KOEF
F 21
A.4.1.1.25
URAIAN PEKERJAAN
SAT.
1
m2
Harga Satuan Pekerjaan (D+E) Memasang Bekisting untuk Dinding
A
Tenaga
L.01
0.66
OH
Pekerja
L.02
0.33
OH
Tukang Kayu
L.03
0.033
OH
Kepala Tukang
L.04
0.033
OH
Mandor
B
Bahan
0.03
m3
Kayu Klas III (Terentang)
0.4
Kg
Paku Biasa 2" - 5"
0.2
Ltr
Minyak Bekisting
0.02
m3
Balok Kayu Klas II
0.35
Lbr
Plywood tebal 9mm
3
Btg
Dolken Kayu Galam diameter 8 - 10 cm / 4 m
4 Buah Formite/Penjaga jarak / Spacer (alat bantu)
22
23
A.4.1.1.26
A.4.1.1.27
414275883.xlsx
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Memasang Bekisting untuk Tangga
A
Tenaga
L.01
0.66
OH
Pekerja
L.02
0.33
OH
Tukang Kayu
L.03
0.033
OH
Kepala Tukang
L.04
0.033
OH
Mandor
B
Bahan
0.03
m3
Kayu Klas III (Terentang)
0.4
Kg
Paku Biasa 2" - 5"
0.15
Ltr
Minyak Bekisting
0.015
m3
Balok Kayu Klas II
0.35
Lbr
Plywood tebal 9mm
2
Btg
Dolken Kayu Galam diameter 8 - 10 cm / 4 m
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
10%
10%
Memasang Jembatan Cor 432/281
abk 7-14
No.
24
25
SNI
KODE
414275883.xlsx
URAIAN PEKERJAAN
SAT. A
Tenaga
L.01
0.15
OH
Pekerja
L.02
0.05
OH
Tukang Kayu
L.03
0.005
OH
Kepala Tukang
L.04
0.008
OH
Mandor
B
Bahan
A.4.1.1.28
A.4.1.1.29
KOEF
0.0264
m3
Kayu Terentang
0.6
kg
Paku Biasa 2" - 5"
0.5
m3
Dolken Kayu Galam diameter 8 - 10 / 4 m
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m3
Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)
A
Tenaga
L.01
5.3
OH
Pekerja
L.02
0.275
OH
Tukang batu
L.02
1.30
OH
Tukang Kayu
L.02
1.05
OH
Tukang Besi
L.03
0.262
OH
Kepala Tukang
L.04
0.265
OH
Mandor
B
Bahan
0.2
m3
Kayu Klas III (Terentang)
1.5
Kg
Paku Biasa 2" - 5"
0.4
Ltr
Minyak Bekisting
157.5
Kg
Besi Beton Polos
2.25
Kg
Kawat Beton
336
Kg
Portland Semen
0.54
m3
Pasir Beton
0.81
m3
Kerikil Beton
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m3 A
10%
10%
Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) Tenaga
432/282
abk 7-14
No.
26
SNI
KODE
URAIAN PEKERJAAN
SAT.
L.01
5.65
OH
Pekerja
L.02
0.275
OH
Tukang batu
L.02
1.56
OH
Tukang Kayu
L.02
1.4
OH
Tukang Besi
L.03
0.323
OH
Kepala Tukang
L.04
0.283
OH
Mandor
B
Bahan
A.4.1.1.30
414275883.xlsx
KOEF
0.27
m3
Kayu Klas III (Terentang)
2
Kg
Paku Biasa 2" - 5"
0.6
Ltr
Minyak Bekisting
210
Kg
Besi Beton Polos
3
Kg
Kawat Beton
336
Kg
Portland Semen
0.54
m3
Pasir Beton
0.81
m3
Kerikil Beton
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m3
10%
Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)
A
Tenaga
L.01
7.05
OH
Pekerja
L.02
0.275
OH
Tukang batu
L.02
1.65
OH
Tukang Kayu
L.02
2.1
OH
Tukang Besi
L.03
0.403
OH
Kepala Tukang
L.04
0.353
OH
Mandor
B
Bahan
0.4
m3
Kayu Klas III (Terentang)
4
Kg
Paku Biasa 2" - 5"
2
Ltr
Minyak Bekisting
315
kg
Besi Beton Polos
4.5
kg
Kawat Beton
336
Kg
Portland Semen
0.54
m3
Pasir Beton
0.81
m3
Kerikil Beton
0.15
m3
Kayu Klas II Balok
3.5
Lbr
Plywood 9 mm
20
Btg
Dolken diameter 8 / 4rm 432/283
abk 7-14
No.
27
28
SNI
KODE
A.4.1.1.31
URAIAN PEKERJAAN
SAT.
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m3 A
Tenaga
6.35
OH
Pekerja
L.02
0.275
OH
Tukang batu
L.02
1.65
OH
Tukang Kayu
L.02
1.4
OH
Tukang Besi
L.03
0.333
OH
Kepala Tukang
L.04
0.318
OH
Mandor
B
Bahan
0.32
m3
Kayu Klas III (Terentang)
3.2
Kg
Paku Biasa 2" - 5"
1.6
Ltr
Minyak Bekisting
210
Kg
Besi Beton Polos
3
Kg
Kawat Beton
336
Kg
Portland Semen
0.54
m3
Pasir Beton
0.81
m3
Kerikil Beton
0.14
m3
Kayu Klas II Balok
2.8
Lbr
Plywood 9 mm
16
Btg
Dolken diameter 8 / 4rm
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m3
10%
Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)
L.01
A.4.1.1.32
414275883.xlsx
KOEF
10%
Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)
A
Tenaga
L.01
5.3
OH
Pekerja
L.02
0.275
OH
Tukang batu
L.02
1.3
OH
Tukang Kayu
L.02
1.05
OH
Tukang Besi
L.03
0.265
OH
Kepala Tukang
L.04
0.265
OH
Mandor
432/284
abk 7-14
No.
SNI
KODE
KOEF
B
29
A.4.1.1.33
414275883.xlsx
URAIAN PEKERJAAN
SAT. Bahan
0.32
m3
Kayu Klas III (Terentang)
3.2
Kg
Paku Biasa 2" - 5"
1.6
Ltr
Minyak Bekisting
157.5
Kg
Besi Beton Polos
2.25
Kg
Kawat Beton
336
Kg
Portland Semen
0.54
m3
Pasir Beton
0.81
m3
Kerikil Beton
0.12
m3
Kayu Klas II Balok
2.8
Lbr
Plywood 9 mm
32
Btg
Dolken diameter 8 / 4rm
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m3
10%
Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)
A
Tenaga
L.01
5.3
OH
Pekerja
L.02
0.275
OH
Tukang batu
L.02
1.3
OH
Tukang Kayu
L.02
1.05
OH
Tukang Besi
L.03
0.262
OH
Kepala Tukang
L.04
0.265
OH
Mandor
B
Bahan
0.24
m3
Kayu Klas III (Terentang)
3.2
Kg
Paku Biasa 2" - 5"
1.6
Ltr
Minyak Bekisting
157.5
Kg
Besi Beton Polos
2.25
Kg
Kawat Beton
336
Kg
Portland Semen
0.54
m3
Pasir Beton
0.81
m3
Kerikil Beton
0.16
m3
Kayu Klas II Balok
2.8
Lbr
Plywood 9 mm
24
Btg
Dolken diameter 8 / 4rm
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%) 432/285
10%
abk 7-14
No.
SNI
KODE
KOEF
F 30
31
A.4.1.1.34
1
m3
Harga Satuan Pekerjaan (D+E) Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)
A
Tenaga
L.01
5.65
OH
Pekerja
L.02
0.275
OH
Tukang batu
L.02
1.56
OH
Tukang Kayu
L.02
1.4
OH
Tukang Besi
L.03
0.323
OH
Kepala Tukang
L.04
0.283
OH
Mandor
B
Bahan
A.4.1.1.35
414275883.xlsx
URAIAN PEKERJAAN
SAT.
0.25
m3
Kayu Klas III (Terentang)
3
Kg
Paku Biasa 2" - 5"
1.2
Ltr
Minyak Bekisting
210
Kg
Besi Beton Polos
3
Kg
Kawat Beton
336
Kg
Portland Semen
0.54
m3
Pasir Beton
0.81
m3
Kerikil Beton
0.105
m3
Kayu Klas II Balok
2.5
Lbr
Plywood 9 mm
14
Btg
Dolken diameter 8 / 4rm
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Membuat Kolom Penguat Beton Bertulang (11 x 11) cm
A
Tenaga
L.01
0.18
OH
Pekerja
L.02
0.02
OH
Tukang batu
L.02
0.02
OH
Tukang Kayu
L.02
0.02
OH
Tukang Besi
L.03
0.006
OH
Kepala Tukang
L.04
0.009
OH
Mandor
B
Bahan
0.002
m3
Kayu Klas III (Terentang)
0.01
Kg
Paku Biasa 2" - 5"
3
Kg
Besi Beton Polos
0.045
Kg
Kawat Beton 432/286
10%
abk 7-14
No.
32
SNI
KODE
A.4.1.1.36
414275883.xlsx
KOEF
URAIAN PEKERJAAN
SAT. 4
Kg
Portland Semen
0.006
m3
Pasir Beton
0.009
m3
Kerikil Beton
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Membuat Ring Balok Beton Bertulang (10 x 15) cm
A
Tenaga
1 L.01
0.297
OH
Pekerja
L.02
0.033
OH
Tukang batu
L.02
0.033
OH
Tukang Kayu
L.02
0.033
OH
Tukang Besi
L.03
0.01
OH
Kepala Tukang
L.04
0.015
OH
Mandor
B
Bahan
0.003
m3
Kayu Klas III (Terentang)
0.02
Kg
Paku Biasa 2" - 5"
3.6
Kg
Besi Beton Polos
0.05
Kg
Kawat Beton
5.5
Kg
Portland Semen
0.009
m3
Pasir Beton
0.015
m3
Kerikil Beton
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/287
10%
10%
abk 7-14
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
923,395.00 126,060.00 57,000.00
94,050.00
84,000.00
23,100.00
87,000.00
2,436.00
78,000.00
6,474.00 713,390.00
1,360.00
335,920.00
200.00
173,800.00
200.00
199,800.00
18.00
3,870.00 839,450.00 83,945.00 923,395.00 960,619.00 126,060.00
57,000.00
94,050.00
84,000.00
23,100.00
87,000.00
2,436.00
78,000.00
6,474.00 747,230.00
1,360.00
375,360.00
200.00
165,600.00
200.00
202,400.00
18.00
3,870.00 873,290.00 87,329.00 960,619.00
2 Mpa (K150), slum (12±2)cm, w/c = 0,72
414275883.xlsx
989,747.00 126,060.00 57,000.00
94,050.00
84,000.00
23,100.00
87,000.00
2,436.00
78,000.00
6,474.00 773,710.00
1,360.00
406,640.00
200.00
159,800.00
432/288
abk 7-14
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 200.00
203,400.00
18.00
3,870.00 899,770.00 89,977.00 989,747.00
mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
866,588.80 87,408.00
57,000.00
68,400.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
468.00 700,400.00
1,360.00
312,800.00
200.00
178,600.00
200.00
205,400.00
18.00
3,600.00 787,808.00 78,780.80 866,588.80
5 MPa (K175), slum (12±2)cm, w/c = 0,66
414275883.xlsx
1,024,199.00 126,060.00 57,000.00
94,050.00
84,000.00
23,100.00
87,000.00
2,436.00
78,000.00
6,474.00 805,030.00
1,360.00
443,360.00
200.00
152,000.00
200.00
205,800.00
18.00
3,870.00 931,090.00 93,109.00 1,024,199.00
432/289
abk 7-14
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
9 MPa (K200), slum (12±2)cm, w/c = 0,61
1,057,155.00 126,060.00 57,000.00
94,050.00
84,000.00
23,100.00
87,000.00
2,436.00
78,000.00
6,474.00 834,990.00
1,360.00
478,720.00
200.00
146,200.00
200.00
206,200.00
18.00
3,870.00 961,050.00 96,105.00 1,057,155.00
3 MPa (K225), slum (12±2)cm, w/c = 0,58
1,081,839.00 126,060.00 57,000.00
94,050.00
84,000.00
23,100.00
87,000.00
2,436.00
78,000.00
6,474.00 857,430.00
1,360.00
504,560.00
200.00
139,600.00
200.00
209,400.00
18.00
3,870.00 983,490.00 98,349.00 1,081,839.00
7 MPa (K250), slum (12±2)cm, w/c = 0,56
414275883.xlsx
1,098,207.00 126,060.00 57,000.00
94,050.00
84,000.00
23,100.00
87,000.00
2,436.00
78,000.00
6,474.00 872,310.00
1,360.00 432/290
522,240.00
abk 7-14
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 200.00
138,400.00
200.00
207,800.00
18.00
3,870.00 998,370.00 99,837.00 1,098,207.00
mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53
1,126,499.00 126,060.00
57,000.00
94,050.00
84,000.00
23,100.00
87,000.00
2,436.00
78,000.00
6,474.00 898,030.00
1,360.00
552,160.00
200.00
136,800.00
200.00
205,200.00
18.00
3,870.00 1,024,090.00 102,409.00 1,126,499.00
4 MPa (K300), slum (12±2)cm, w/c = 0,52
414275883.xlsx
1,135,211.00 126,060.00 57,000.00
94,050.00
84,000.00
23,100.00
87,000.00
2,436.00
78,000.00
6,474.00 905,950.00
1,360.00
561,680.00
200.00
136,200.00
200.00
204,200.00
18.00
3,870.00 1,032,010.00 103,201.00 1,135,211.00
432/291
abk 7-14
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
8 MPa (K325), slum (12±2)cm, w/c = 0,49
1,206,089.50 160,335.00 57,000.00
119,700.00
84,000.00
29,400.00
87,000.00
3,045.00
78,000.00
8,190.00 936,110.00
1,360.00
597,040.00
200.00
134,000.00
200.00
201,200.00
18.00
3,870.00 1,096,445.00 109,644.50 1,206,089.50
2 MPa (K350), slum (12±2)cm, w/c = 0,48
414275883.xlsx
1,217,573.50 160,335.00 57,000.00
119,700.00
84,000.00
29,400.00
87,000.00
3,045.00
78,000.00
8,190.00 946,550.00
1,360.00
609,280.00
200.00
133,400.00
200.00
200,000.00
18.00
3,870.00 1,106,885.00 110,688.50 1,217,573.50 158,720.10 10,791.00
57,000.00
3,990.00
84,000.00
5,880.00
87,000.00
609.00
78,000.00
312.00 133,500.00
12,500.00 432/292
131,250.00
abk 7-14
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
15,000.00
2,250.00 144,291.00 14,429.10 158,720.10 125,640.90 7,719.00
57,000.00
2,850.00
84,000.00
4,200.00
87,000.00
435.00
78,000.00
234.00 106,500.00
10,000.00
105,000.00
15,000.00
1,500.00 114,219.00 11,421.90 125,640.90 229,379.70 3,777.00
57,000.00
1,425.00
84,000.00
2,100.00
87,000.00
174.00
78,000.00
78.00 204,750.00
20,000.00
204,000.00
15,000.00
750.00 208,527.00 20,852.70 229,379.70 155,034.00 55,770.00
57,000.00
29,640.00
84,000.00
21,840.00
432/293
abk 7-14
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
87,000.00
2,262.00
78,000.00
2,028.00 85,170.00
2,000,000.00
80,000.00
14,000.00
4,200.00
9,700.00
970.00 140,940.00 14,094.00 155,034.00 166,034.00 55,770.00
57,000.00
29,640.00
84,000.00
21,840.00
87,000.00
2,262.00
78,000.00
2,028.00 95,170.00
2,000,000.00
90,000.00
14,000.00
4,200.00
9,700.00
970.00 150,940.00 15,094.00 166,034.00 348,782.50 70,785.00
57,000.00
37,620.00
84,000.00
27,720.00
87,000.00
2,871.00
78,000.00
2,574.00 246,290.00
2,000,000.00
80,000.00
14,000.00
5,600.00
9,700.00
1,940.00
5,500,000.00
82,500.00
115,000.00
40,250.00
18,000.00
36,000.00
432/294
abk 7-14
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 317,075.00 31,707.50 348,782.50 366,932.50 70,785.00
57,000.00
37,620.00
84,000.00
27,720.00
87,000.00
2,871.00
78,000.00
2,574.00 262,790.00
2,000,000.00
80,000.00
14,000.00
5,600.00
9,700.00
1,940.00
5,500,000.00
99,000.00
115,000.00
40,250.00
18,000.00
36,000.00 333,575.00 33,357.50 366,932.50 427,982.50 70,785.00
57,000.00
37,620.00
84,000.00
27,720.00
87,000.00
2,871.00
78,000.00
2,574.00 318,290.00
2,000,000.00
80,000.00
14,000.00
5,600.00
9,700.00
1,940.00
5,500,000.00
82,500.00
115,000.00
40,250.00
18,000.00
108,000.00 389,075.00 38,907.50
432/295
abk 7-14
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 427,982.50 398,832.50 70,785.00
57,000.00
37,620.00
84,000.00
27,720.00
87,000.00
2,871.00
78,000.00
2,574.00 291,790.00
2,000,000.00
60,000.00
14,000.00
5,600.00
9,700.00
1,940.00
5,500,000.00
110,000.00
115,000.00
40,250.00
18,000.00
54,000.00
5,000.00
20,000.00 362,575.00 36,257.50 398,832.50 326,249.00 70,785.00
57,000.00
37,620.00
84,000.00
27,720.00
87,000.00
2,871.00
78,000.00
2,574.00 225,805.00
2,000,000.00
60,000.00
14,000.00
5,600.00
9,700.00
1,455.00
5,500,000.00
82,500.00
115,000.00
40,250.00
18,000.00
36,000.00 296,590.00 29,659.00 326,249.00 92,409.90
432/296
abk 7-14
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 13,809.00
57,000.00
8,550.00
84,000.00
4,200.00
87,000.00
435.00
78,000.00
624.00 70,200.00
2,000,000.00
52,800.00
14,000.00
8,400.00
18,000.00
9,000.00 84,009.00 8,400.90 92,409.90 3,769,209.40 566,064.00
57,000.00
302,100.00
84,000.00
23,100.00
84,000.00
109,200.00
84,000.00
88,200.00
87,000.00
22,794.00
78,000.00
20,670.00 2,860,490.00
2,000,000.00
400,000.00
14,000.00
21,000.00
9,700.00
3,880.00
10,000.00
1,575,000.00
15,000.00
33,750.00
1,360.00
456,960.00
280,000.00
151,200.00
270,000.00
218,700.00 3,426,554.00 342,655.40 3,769,209.40 4,608,609.50 643,965.00
432/297
abk 7-14
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
57,000.00
322,050.00
84,000.00
23,100.00
84,000.00
131,040.00
84,000.00
117,600.00
87,000.00
28,101.00
78,000.00
22,074.00 3,545,680.00
2,000,000.00
540,000.00
14,000.00
28,000.00
9,700.00
5,820.00
10,000.00
2,100,000.00
15,000.00
45,000.00
1,360.00
456,960.00
280,000.00
151,200.00
270,000.00
218,700.00 4,189,645.00 418,964.50 4,608,609.50 8,040,785.50 802,545.00
57,000.00
401,850.00
84,000.00
23,100.00
84,000.00
138,600.00
84,000.00
176,400.00
87,000.00
35,061.00
78,000.00
27,534.00 6,507,260.00
2,000,000.00
800,000.00
14,000.00
56,000.00
9,700.00
19,400.00
10,000.00
3,150,000.00
15,000.00
67,500.00
1,360.00
456,960.00
280,000.00
151,200.00
270,000.00
218,700.00
5,500,000.00
825,000.00
115,000.00
402,500.00
18,000.00
360,000.00
432/298
abk 7-14
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
7,309,805.00 730,980.50 8,040,785.50 6,321,925.50 695,025.00 57,000.00
361,950.00
84,000.00
23,100.00
84,000.00
138,600.00
84,000.00
117,600.00
87,000.00
28,971.00
78,000.00
24,804.00 5,052,180.00
2,000,000.00
640,000.00
14,000.00
44,800.00
9,700.00
15,520.00
10,000.00
2,100,000.00
15,000.00
45,000.00
1,360.00
456,960.00
280,000.00
151,200.00
270,000.00
218,700.00
5,500,000.00
770,000.00
115,000.00
322,000.00
18,000.00
288,000.00 5,747,205.00 574,720.50 6,321,925.50 5,786,280.50 566,325.00
57,000.00
302,100.00
84,000.00
23,100.00
84,000.00
109,200.00
84,000.00
88,200.00
87,000.00
23,055.00
78,000.00
20,670.00
432/299
abk 7-14
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 4,693,930.00
2,000,000.00
640,000.00
14,000.00
44,800.00
9,700.00
15,520.00
10,000.00
1,575,000.00
15,000.00
33,750.00
1,360.00
456,960.00
280,000.00
151,200.00
270,000.00
218,700.00
5,500,000.00
660,000.00
115,000.00
322,000.00
18,000.00
576,000.00 5,260,255.00 526,025.50 5,786,280.50 5,693,593.40 566,064.00
57,000.00
302,100.00
84,000.00
23,100.00
84,000.00
109,200.00
84,000.00
88,200.00
87,000.00
22,794.00
78,000.00
20,670.00 4,609,930.00
2,000,000.00
480,000.00
14,000.00
44,800.00
9,700.00
15,520.00
10,000.00
1,575,000.00
15,000.00
33,750.00
1,360.00
456,960.00
280,000.00
151,200.00
270,000.00
218,700.00
5,500,000.00
880,000.00
115,000.00
322,000.00
18,000.00
432,000.00 5,175,994.00 517,599.40
432/300
abk 7-14
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 5,693,593.40 5,815,111.50 643,965.00
57,000.00
322,050.00
84,000.00
23,100.00
84,000.00
131,040.00
84,000.00
117,600.00
87,000.00
28,101.00
78,000.00
22,074.00 4,642,500.00
2,000,000.00
500,000.00
14,000.00
42,000.00
9,700.00
11,640.00
10,000.00
2,100,000.00
15,000.00
45,000.00
1,360.00
456,960.00
280,000.00
151,200.00
270,000.00
218,700.00
5,500,000.00
577,500.00
115,000.00
287,500.00
18,000.00
252,000.00 5,286,465.00 528,646.50 5,815,111.50 66,977.90 16,524.00
57,000.00
10,260.00
84,000.00
1,680.00
84,000.00
1,680.00
84,000.00
1,680.00
87,000.00
522.00
78,000.00
702.00 44,365.00
2,000,000.00
4,000.00
14,000.00
140.00
10,000.00
30,000.00
15,000.00
675.00
432/301
abk 7-14
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
1,360.00
5,440.00
280,000.00
1,680.00
270,000.00
2,430.00 60,889.00 6,088.90 66,977.90 92,801.50 27,285.00
57,000.00
16,929.00
84,000.00
2,772.00
84,000.00
2,772.00
84,000.00
2,772.00
87,000.00
870.00
78,000.00
1,170.00 57,080.00
2,000,000.00
6,000.00
14,000.00
280.00
10,000.00
36,000.00
15,000.00
750.00
1,360.00
7,480.00
280,000.00
2,520.00
270,000.00
4,050.00 84,365.00 8,436.50 92,801.50
432/302
abk 7-14
No.
SNI
VIII
A.4.5.2
1
A.4.5.2.1
KODE
KOEF
URAIAN PEKERJAAN
SAT.
HARGA SATUAN PEKERJAAN PENUTUP ATAP 1
m2
Pemasangan Atap Genteng Plentong Kecil
A
Tenaga
L.01
0.15
OH
Pekerja
L.02
0.075
OH
Tukang Kayu
L.03
0.0075
OH
Kepala Tukang
L.04
0.008
OH
Mandor
B
Bahan
25
Buah
Genteng Plentong
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%)
2
A.4.5.2.2
1
414275883.xlsx
Pemasangan Atap Genteng Kodok / Glasur
A
Tenaga
L.01
0.15
OH
Pekerja
L.02
0.075
OH
Tukang Kayu
L.03
0.008
OH
Kepala Tukang
L.04
0.008
OH
Mandor
B
Bahan
25
3
m2
A.4.5.2.3
1
Buah
Genteng Kodok / Glasur
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Atap Genteng Plentong Super / Besar
A
Tenaga
L.01
0.15
OH
Pekerja
L.02
0.075
OH
Tukang Kayu
L.03
0.008
OH
Kepala Tukang
432/303
abk 8-14
No.
SNI
KODE L.04
KOEF 0.008
18
4
414275883.xlsx
A.4.5.2.4
URAIAN PEKERJAAN
SAT.
1
OH
Mandor
B
Bahan
Buah
Genteng Plentong Super / Besar
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Genteng Bubung Plentong
A
Tenaga
L.01
0.4
OH
Pekerja
L.02
0.2
OH
Tukang Kayu
L.03
0.02
OH
Kepala Tukang
L.04
0.002
OH
Mandor
B
Bahan
5
Buah
Genteng Bubung Plentong
8
Kg
Portland Semen
0.032
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/304
abk 8-14
No.
SNI
5
A.4.5.2.5
6
7
414275883.xlsx
KODE
KOEF
URAIAN PEKERJAAN
SAT. 1
m'
Pemasangan Genteng Bubung Kodok / Glasur
A
Tenaga
L.01
0.4
OH
Pekerja
L.02
0.2
OH
Tukang Kayu
L.03
0.02
OH
Kepala Tukang
L.04
0.002
OH
Mandor
B
Bahan
A.4.5.2.6
5
Buah
8
Kg
Portland Semen
0.032
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Genteng Bubung Plentong Besar
A
Tenaga
1
Genteng Bubung Kodok / Glasur
L.01
0.4
OH
Pekerja
L.02
0.2
OH
Tukang Kayu
L.03
0.02
OH
Kepala Tukang
L.04
0.002
OH
Mandor
B
Bahan
A.4.5.2.9
4
Buah
8
Kg
Portland Semen
0.032
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
L.01
0.14
m2
Genteng Bubung Plentong Besar
Pemasangan Atap Asbes Gelombang (2,25x0,92 m) x 5 m
A
Tenaga
OH
Pekerja
432/305
abk 8-14
No.
8
414275883.xlsx
SNI
KODE
KOEF
URAIAN PEKERJAAN
SAT.
L.02
0.075
OH
Tukang Kayu
L.03
0.008
OH
Kepala Tukang
L.04
0.008
OH
Mandor
B
Bahan
A.4.5.2.10
0.6
Lbr
Asbes Gelombang
0.12
Kg
Paku Pancing 60 x 230
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Atap Asbes Gelombang (2,00x0,92 m) x 5 m
A
Tenaga
L.01
0.14
OH
Pekerja
L.02
0.07
OH
Tukang Kayu
L.03
0.007
OH
Kepala Tukang
L.04
0.007
OH
Mandor
B
Bahan
0.6
Lbr
Asbes Gelombang
0.12
Kg
Paku Pancing 60 x 230
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/306
abk 8-14
No.
SNI
9
A.4.5.2.12
10
11
414275883.xlsx
KODE
KOEF
URAIAN PEKERJAAN
SAT. 1
m2
Pemasangan Atap Asbes Gelombang (3,00x1,05 m) x 4 m
A
Tenaga
L.01
0.14
OH
Pekerja
L.02
0.07
OH
Tukang Kayu
L.03
0.007
OH
Kepala Tukang
L.04
0.007
OH
Mandor
B
Bahan
A.4.5.2.15
0.35
Lbr
Asbes Gelombang
0.12
Kg
Paku Pancing 60 x 230
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Atap Asbes Gelombang (2,10x1,05 m) x 4 m
A
Tenaga
L.01
0.14
OH
Pekerja
L.02
0.070
OH
Tukang Kayu
L.03
0.007
OH
Kepala Tukang
L.04
0.007
OH
Mandor
B
Bahan
A.4.5.2.30
0.51
Lbr
Asbes Gelombang
0.12
Kg
Paku Pancing 60 x 230
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Atap Genteng Beton
A
Tenaga
L.01
0.2
OH
Pekerja
L.02
0.1
OH
Tukang Kayu
L.03
0.01
OH
Kepala Tukang
432/307
abk 8-14
No.
SNI
KODE L.04
12
13
414275883.xlsx
A.4.5.2.32
KOEF
URAIAN PEKERJAAN
SAT.
0.01
OH
Mandor
B
Bahan
11
Lbr
Genteng Beton Standrad
0.03
Kg
Paku Biasa 2" - 5"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Atap Genteng Metal
A
Tenaga
L.01
0.2
OH
Pekerja
L.02
0.1
OH
Tukang Kayu
L.03
0.01
OH
Kepala Tukang
L.04
0.01
OH
Mandor
B
Bahan
A.4.5.2.33
1.02
m2
Genteng Metal
0.20
Kg
Paku Biasa Ø ½" - 1"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Atap Sirap
A
Tenaga
L.01
0.166
OH
Pekerja
L.02
0.25
OH
Tukang Kayu
L.03
0.025
OH
Kepala Tukang
L.04
0.008
OH
Mandor
B
Bahan
30
Lbr
Genteng Sirap
0.2
Kg
Paku Biasa 1/2" - 1"
432/308
abk 8-14
No.
14
15
414275883.xlsx
SNI
KODE
A.4.5.2.34
KOEF
URAIAN PEKERJAAN
SAT.
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Nok Genteng Beton
A
Tenaga
L.01
0.4
OH
Pekerja
L.02
0.2
OH
Tukang Kayu
L.03
0.02
OH
Kepala Tukang
L.04
0.02
OH
Mandor
B
Bahan
A.4.5.2.36
3.5
Buah
0.05
Kg
Paku Biasa 2" - 5"
10.8
Kg
Portland Semen
0.032
m3
Pasir Pasang
1
Kg
Semen Warna
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Nok Genteng Metal
A
Tenaga
1
Nok Genteng Beton
L.01
0.250
OH
Pekerja
L.02
0.150
OH
Tukang Kayu
L.03
0.015
OH
Kepala Tukang
L.04
0.013
OH
Mandor
B
Bahan
1.1
Buah
Nok Genteng
0.05
Kg
Paku Biasa 1/2" - 1"
C
PERALATAN
432/309
abk 8-14
No.
16
17
414275883.xlsx
SNI
KODE
A.4.5.2.37
KOEF
URAIAN PEKERJAAN
SAT.
1
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Nok Sirap
A
Tenaga
L.01
0.125
OH
Pekerja
L.02
0.25
OH
Tukang Kayu
L.03
0.025
OH
Kepala Tukang
L.04
0.006
OH
Mandor
B
Bahan
A.4.5.2.38
0.4
Lbr
Seng Plaat 3" x 6" BJLS 28
0.06
Kg
Paku Biasa 1/2" - 1"
0.05
Kg
Paku Biasa 2" - 5"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Atap Seng Gelombang
A
Tenaga
L.01
0.12
OH
Pekerja
L.02
0.06
OH
Tukang Kayu
L.03
0.006
OH
Kepala Tukang
L.04
0.006
OH
Mandor
B
Bahan
0.7
Lbr
Seng Gelombang 3" x 6" BJLS 28
0.02
Kg
Paku Biasa 1/2" - 1"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/310
abk 8-14
No.
SNI
18
A.4.5.2.39
19
414275883.xlsx
KODE
KOEF
URAIAN PEKERJAAN
SAT.
1
m'
Pemasangan Atap Nok Seng
A
Tenaga
L.01
0.15
OH
Pekerja
L.02
0.07
OH
Tukang Kayu
L.03
0.007
OH
Kepala Tukang
L.04
0.006
OH
Mandor
B
Bahan
A.4.5.2.42
0.3
Lbr
Seng Plaat 3" x 6" BJLS 28
0.04
Kg
Paku Biasa 1/2" - 1"
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pasang Allumunium Foil / Sisalation
A
Tenaga
L.01
0.15
OH
Pekerja
L.02
0.05
OH
Tukang Kayu
L.03
0.005
OH
Kepala Tukang
L.04
0.008
OH
Mandor
B
Bahan
1.05
m2
Sisalation / Allumunium Foil
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/311
abk 8-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
PEKERJAAN PENUTUP ATAP 64,489.15 16,126.50 57,000.00
8,550.00
84,000.00
6,300.00
87,000.00
652.50
78,000.00
624.00 42,500.00
1,700.00
42,500.00
58,626.50 5,862.65
10%
64,489.15
130,537.00 16,170.00 57,000.00
8,550.00
84,000.00
6,300.00
87,000.00
696.00
78,000.00
624.00 102,500.00
4,100.00
102,500.00
118,670.00 11,867.00
10%
130,537.00
Genteng Plentong Super / Besar
414275883.xlsx
120,747.00 16,170.00 57,000.00
8,550.00
84,000.00
6,300.00
87,000.00
696.00
432/312
abk 8-14
URAIAN PEKERJAAN
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
78,000.00
624.00 93,600.00
5,200.00
93,600.00
109,770.00 10,977.00
10%
120,747.00
114,505.60 41,496.00 57,000.00
22,800.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
156.00 62,600.00
9,000.00
45,000.00
1,360.00
10,880.00
210,000.00
6,720.00
104,096.00 10,409.60
10%
114,505.60
432/313
abk 8-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
eng Bubung Kodok / Glasur
101,305.60 41,496.00 57,000.00
22,800.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
156.00 50,600.00
6,600.00
33,000.00
1,360.00
10,880.00
210,000.00
6,720.00
92,096.00 9,209.60
10%
101,305.60
eng Bubung Plentong Besar
104,605.60 41,496.00 57,000.00
22,800.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
156.00 53,600.00
9,000.00
36,000.00
1,360.00
10,880.00
210,000.00
6,720.00
95,096.00 9,509.60
10%
104,605.60
Asbes Gelombang (2,25x0,92 m) x 5 mm
414275883.xlsx
66,396.00 15,600.00 57,000.00 432/314
7,980.00
abk 8-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
84,000.00
6,300.00
87,000.00
696.00
78,000.00
624.00 44,760.00
71,500.00
42,900.00
15,500.00
1,860.00
60,360.00 6,036.00
10%
66,396.00
Asbes Gelombang (2,00x0,92 m) x 5 mm
414275883.xlsx
60,472.50 15,015.00 57,000.00
7,980.00
84,000.00
5,880.00
87,000.00
609.00
78,000.00
546.00 39,960.00
63,500.00
38,100.00
15,500.00
1,860.00
54,975.00 5,497.50
10%
60,472.50
432/315
abk 8-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
Asbes Gelombang (3,00x1,05 m) x 4 mm
52,057.50 15,015.00 57,000.00
7,980.00
84,000.00
5,880.00
87,000.00
609.00
78,000.00
546.00 32,310.00
87,000.00
30,450.00
15,500.00
1,860.00
47,325.00 4,732.50
10%
52,057.50
Asbes Gelombang (2,10x1,05 m) x 4 mm
414275883.xlsx
53,344.50 15,015.00 57,000.00
7,980.00
84,000.00
5,880.00
87,000.00
609.00
78,000.00
546.00 33,480.00
62,000.00
31,620.00
15,500.00
1,860.00
48,495.00 4,849.50
10%
53,344.50
96,657.00 21,450.00 57,000.00
11,400.00
84,000.00
8,400.00
87,000.00
870.00
432/316
abk 8-14
URAIAN PEKERJAAN
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
78,000.00
780.00 66,420.00
6,000.00
66,000.00
14,000.00
420.00
87,870.00 8,787.00
10%
96,657.00 82,775.00 21,450.00 57,000.00
11,400.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
780.00 53,800.00
50,000.00
51,000.00
14,000.00
2,800.00
75,250.00 7,525.00
10%
82,775.00 101,377.10 33,261.00 57,000.00
9,462.00
84,000.00
21,000.00
87,000.00
2,175.00
78,000.00
624.00 58,900.00
1,870.00
56,100.00
14,000.00
2,800.00
432/317
abk 8-14
URAIAN PEKERJAAN
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
92,161.00 9,216.10
10%
101,377.10
106,158.80 42,900.00 57,000.00
22,800.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
1,560.00 53,608.00
9,000.00
31,500.00
14,000.00
700.00
1,360.00
14,688.00
210,000.00
6,720.00
9,000.00
9,000.00
96,508.00 9,650.80
10%
106,158.80
57,055.90 29,169.00 57,000.00
14,250.00
84,000.00
12,600.00
87,000.00
1,305.00
78,000.00
1,014.00 22,700.00
20,000.00
22,000.00
14,000.00
700.00
432/318
abk 8-14
URAIAN PEKERJAAN
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 51,869.00 5,186.90
10%
57,055.90
46,978.80 30,768.00 57,000.00
7,125.00
84,000.00
21,000.00
87,000.00
2,175.00
78,000.00
468.00 11,940.00
26,000.00
10,400.00
14,000.00
840.00
14,000.00
700.00
42,708.00 4,270.80
10%
46,978.80
34,485.00 12,870.00 57,000.00
6,840.00
84,000.00
5,040.00
87,000.00
522.00
78,000.00
468.00 18,480.00
26,000.00
18,200.00
14,000.00
280.00
31,350.00 3,135.00
10%
34,485.00
432/319
abk 8-14
URAIAN PEKERJAAN
414275883.xlsx
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
26,253.70 15,507.00 57,000.00
8,550.00
84,000.00
5,880.00
87,000.00
609.00
78,000.00
468.00 8,360.00
26,000.00
7,800.00
14,000.00
560.00
23,867.00 2,386.70
10%
26,253.70
24,083.40 13,809.00 57,000.00
8,550.00
84,000.00
4,200.00
87,000.00
435.00
78,000.00
624.00 8,085.00
7,700.00
8,085.00
21,894.00 2,189.40
10%
24,083.40
432/320
abk 8-14
No.
SNI
IX
A.4.5.1 1
KODE
KOEF
URAIAN PEKERJAAN
SAT.
HARGA SATUAN PEKERJAAN LANGIT-LANGIT
A.4.5.1.1
1
m2
Pemasangan Langit-langit Asbes (1,00x1,00) m, teba
A
Tenaga
L.01
0.03
OH
Pekerja
L.02
0.07
OH
Tukang Kayu
L.03
0.007
OH
Kepala Tukang
L.04
0.004
OH
Mandor
B
Bahan
1.1
Lbr
Plat Asbes
0.01
Kg
Paku
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%)
2
3
A.4.5.1.2
1
Pemasangan Langit-langit Akustik Ukuran (30x30) cm
A
Tenaga
L.01
0.12
OH
Pekerja
L.02
0.12
OH
Tukang Kayu
L.03
0.012
OH
Kepala Tukang
L.04
0.006
OH
Mandor
B
Bahan
A.4.5.1.3
12.0
Lbr
Akustik Uk.30 x 30 cm
0.05
Kg
Paku
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
L.01 414275883.xlsx
m2
0.10
m2
Pemasangan Langit-langit Akustik Ukuran (30x60) c
A
Tenaga
OH
Pekerja
432/321
abk 9-14
No.
4
5
SNI
KODE
URAIAN PEKERJAAN
SAT.
L.02
0.10
OH
Tukang Kayu
L.03
0.01
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
5.80
Lbr
Akustik
0.05
Kg
Paku
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.4.5.1.4
1
m2
Pemasangan Langit-langit Akustik Ukuran (60x120)
A
Tenaga
L.01
0.10
OH
Pekerja
L.02
0.10
OH
Tukang Kayu
L.03
0.01
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
1.50
Lbr
Akustik
0.05
Kg
Paku
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.4.5.1.5
414275883.xlsx
KOEF
1
m2
Memasang Langit-langit Tripleks Uk (120x240) cm, T
A
Tenaga
L.01
0.10
OH
Pekerja
L.02
0.10
OH
Tukang Kayu
L.03
0.01
OH
Kepala Tukang
L.04
0.005
OH
Mandor
432/322
abk 9-14
No.
SNI
KODE
KOEF
B
6
7
A.4.5.1.6
Bahan
0.375
Lbr
Tripleks (4 mm)
0.03
Kg
Paku Tripleks
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Memasang Langit-langit Lambriziring Kayu Jati, teba
A
Tenaga
L.01
0.8
OH
Pekerja
L.02
0.8
OH
Tukang Kayu
L.03
0.08
OH
Kepala Tukang
L.04
0.04
OH
Mandor
B
Bahan
A.4.5.1.7
414275883.xlsx
URAIAN PEKERJAAN
SAT.
0.015
m3
Kayu Jati,Papan
0.01
Kg
Paku
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Memasang Langit-langit Gypsu Board, Uk (120x240)
A
Tenaga
L.01
0.1
OH
Pekerja
L.02
0.05
OH
Tukang Kayu
L.03
0.005
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
0.364
Lbr
Gypsum Board
0.11
Kg
Paku Sekrup
C
PERALATAN
D
Jumlah A + B + C
432/323
abk 9-14
No.
8
9
SNI
KODE
A.4.5.1.9
URAIAN PEKERJAAN
SAT.
1
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Memasang Langit-langit Akuatik Uk (60x120) cm & R
A
Tenaga
L.01
0.5
OH
Pekerja
L.02
0.5
OH
Tukang Kayu
L.03
0.05
OH
Kepala Tukang
L.04
0.025
OH
Mandor
B
Bahan
3.6
m'
Profil Allumunium "T"
0.15
kg
Kawat Ø 4 mm
1.05
bh
Ramset
1.5
lmb
Akuatik 60 x 120 cm
A.4.5.1.10
414275883.xlsx
KOEF
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m1
List Langit-Langit Kayu Profil
A
Tenaga
L.01
0.05
OH
Pekerja
L.02
0.05
OH
Tukang Kayu
L.03
0.005
OH
Kepala Tukang
L.04
0.003
OH
Mandor
B
Bahan
1.05
m1
List Kayu Profil
0.01
Kg
Paku
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/324
abk 9-14
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
URAIAN PEKERJAAN
PEKERJAAN LANGIT-LANGIT
ngit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm
28,876.10 8,511.00 57,000.00
1,710.00
84,000.00
5,880.00
87,000.00
609.00
78,000.00
312.00 17,740.00
16,000.00
17,600.00
14,000.00
140.00
26,251.00 2,625.10
10%
28,876.10
ngit-langit Akustik Ukuran (30x30) cm
94,965.20 18,432.00 57,000.00
6,840.00
84,000.00
10,080.00
87,000.00
1,044.00
78,000.00
468.00 67,900.00
5,600.00
67,200.00
14,000.00
700.00
86,332.00 8,633.20
10%
94,965.20
ngit-langit Akustik Ukuran (30x60) cm
103,796.00 15,360.00 57,000.00
414275883.xlsx
432/325
5,700.00 abk 9-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
84,000.00
8,400.00
87,000.00
870.00
78,000.00
390.00 79,000.00
13,500.00
78,300.00
14,000.00
700.00
94,360.00 9,436.00
10%
103,796.00
ngit-langit Akustik Ukuran (60x120) cm
85,316.00 15,360.00 57,000.00
5,700.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
390.00 62,200.00
41,000.00
61,500.00
14,000.00
700.00
77,560.00 7,756.00
10%
85,316.00
it-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm
43,345.50 15,360.00
414275883.xlsx
57,000.00
5,700.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
390.00
432/326
abk 9-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 24,045.00
63,000.00
23,625.00
14,000.00
420.00
39,405.00 3,940.50
10%
43,345.50
it-langit Lambriziring Kayu Jati, tebal 6 mm
498,322.00 122,880.00 57,000.00
45,600.00
84,000.00
67,200.00
87,000.00
6,960.00
78,000.00
3,120.00 330,140.00
22,000,000.00
330,000.00
14,000.00
140.00
453,020.00 45,302.00
10%
498,322.00
it-langit Gypsu Board, Uk (120x240) tebal 9 mm
39,838.70 10,725.00 57,000.00
5,700.00
84,000.00
4,200.00
87,000.00
435.00
78,000.00
390.00 25,492.00
65,500.00
23,842.00
15,000.00
1,650.00
36,217.00 414275883.xlsx
432/327
abk 9-14
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
URAIAN PEKERJAAN
3,621.70
10%
39,838.70
it-langit Akuatik Uk (60x120) cm & Rangka Allumunium
191,895.00 76,800.00 57,000.00
28,500.00
84,000.00
42,000.00
87,000.00
4,350.00
78,000.00
1,950.00 97,650.00
3,500.00
12,600.00
6,500.00
975.00
21,500.00
22,575.00
41,000.00
61,500.00
174,450.00 17,445.00
10%
191,895.00
14,188.90 7,719.00 57,000.00
2,850.00
84,000.00
4,200.00
87,000.00
435.00
78,000.00
234.00 5,180.00
4,800.00
5,040.00
14,000.00
140.00
12,899.00 1,289.90
10%
14,188.90
414275883.xlsx
432/328
abk 9-14
No.
SNI
X
A.5.1.1
1
KODE
KOEF
URAIAN PEKERJAAN
SAT.
HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUN 1 Unit Memasang Closet Duduk / Mono Blok
A.5.1.1.1
A
Tenaga
L.01
3.3
OH
Pekerja
L.02
1.1
OH
Tukang Batu
L.03
0.001
OH
Kepala Tukang
L.04
0.16
OH
Mandor
Buah 1 Buah 0.06
Bahan Kloset Duduk / Monoblok Kelengkapan 6% dari harga Kloset
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%)
2
1 Unit
A.5.1.1.2
Tenaga
1
OH
Pekerja
L.02
1.5
OH
Tukang Batu
L.03
1.5
OH
Kepala Tukang
L.04
0.16
OH
Mandor
B
Bahan
Buah Kloset Jongkok
6
Kg
Portland Semen
0.01
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1 Unit
A.5.1.1.4
414275883.xlsx432/329
A L.01
1
3
Memasang Closet Jongkok Porselen
Memasang Urinoir
A
Tenaga
L.01
1
OH
Pekerja
L.02
1
OH
Tukang Batu
L.03
0.1
OH
Kepala Tukang abk 10-14
No.
SNI
KODE L.04
KOEF 0.1
1 0.3
4
B
Bahan
Buah Urinoir -
Perlengkapan 30% Harga Urinoir
Kg
Portland Semen
0.01
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
Memasang Wastafel
A
Tenaga
L.01
1.2
OH
Pekerja
L.02
0.145
OH
Tukang Batu
L.03
0.15
OH
Kepala Tukang
L.04
0.1
OH
Mandor
B
Bahan
0.3
A.5.1.1.6
414275883.xlsx432/330
Mandor
6
1
5
OH
1 Unit
A.5.1.1.5
URAIAN PEKERJAAN
SAT.
Buah Wastafel -
Perlengkapan 30% Harga Wastafel
6
Kg
Portland Semen
0.01
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1 Unit Pemasangan Bathcuip porselen A
Tenaga
L.01
0.075
OH
Pekerja
L.02
0.75
OH
Tukang Batu
L.03
0.075
OH
Kepala Tukang
L.04
0.003
OH
Mandor
abk 10-14
No.
SNI
KODE
KOEF
B
1 0.2
6
A.5.1.1.7
-
Perlengkapan 20% Harga Bathcuip
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1 Unit Pemasangan Bak Fibreglass vol.1 m3 A
Tenaga
L.01
3
OH
Pekerja
L.02
4.5
OH
Tukang Batu
L.03
0.05
OH
Kepala Tukang
L.04
0.9
OH
Mandor
1 0.12
A.5.1.1.8
Tukang Batu
Buah Bak Fibreglass -
Perlengkapan 12% Bak Fibreglass
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1 Unit
Memasang Bak Mandi Batu Bata Vol. 0,30 m3
A
Tenaga
L.01
6.00
OH
Pekerja
L.02
3.00
OH
Tukang Batu
L.03
0.30
OH
Kepala Tukang
L.04
0.03
OH
Mandor
B
Bahan
150.0
bh
Batu Bata
120
Kg
Portland Semen
0.3
m3
Pasir Pasang
360 6
414275883.xlsx432/331
Bahan
Buah Batchuip
B
7
URAIAN PEKERJAAN
SAT.
buah Porselen 11 x 11 cm Kg
Semen Nat
C
PERALATAN
D
Jumlah A + B + C abk 10-14
No.
8
9
SNI
KODE
A.5.1.1.12
KOEF
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1 buah Pemasangan Bak Cuci Piring Stainless stell A
Tenaga
L.01
0.030
OH
Pekerja
L.02
0.300
OH
Tukang Batu
L.03
0.030
OH
Kepala Tukang
L.04
0.015
OH
Mandor
B
Bahan
A.5.1.1.14
1
unit
Bak Cuci Piring
1
bh
Water drain
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1 buah Pemasangan Floor Drain A
Tenaga
L.01
0.010
OH
Pekerja
L.02
0.100
OH
Tukang Batu
L.03
0.010
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
bh
Floor Drain
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
414275883.xlsx432/332
URAIAN PEKERJAAN
SAT.
abk 10-14
No.
SNI
10
A.5.1.1.15
11
KODE
URAIAN PEKERJAAN
SAT. 1
bh
Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 c
A
Tenaga
L.01
2.160
OH
Pekerja
L.02
0.720
OH
Tukang Batu
L.03
0.072
OH
Kepala Tukang
L.04
0.011
OH
Mandor
B
Bahan
40.00
bh
Batu Bata
44.00
kg
Semen Portland
0.07
m3
Pasir Pasang
0.06
m3
Pasir Beton
0.07
m3
Kerikil
1.60
kg
Baja Tulangan
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.5.1.1.16
414275883.xlsx432/333
KOEF
1
bh
Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50
A
Tenaga
L.01
3.200
OH
Pekerja
L.02
1.150
OH
Tukang Batu
L.03
0.011
OH
Kepala Tukang
L.04
0.016
OH
Mandor
B
Bahan
70.00
bh
Batu Bata
77.00
kg
Semen Portland
0.13
m3
Pasir Pasang
0.09
m3
Pasir Beton
0.02
m3
Kerikil
1.60
kg
Baja Tulangan
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
abk 10-14
No.
SNI
12
A.5.1.1.17
13
KODE
URAIAN PEKERJAAN
SAT. 1
bh
Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 c
A
Tenaga
L.01
3.200
OH
Pekerja
L.02
1.150
OH
Tukang Batu
L.03
0.011
OH
Kepala Tukang
L.04
0.016
OH
Mandor
B
Bahan
123.00
bh
Batu Bata
114.00
kg
Semen Portland
0.18
m3
Pasir Pasang
0.12
m3
Pasir Beton
4.85
kg
Baja Tulangan
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa Galvanis Ø ½"
A
Tenaga
A.5.1.1.18
414275883.xlsx432/334
KOEF
1 L.01
0.054
OH
Pekerja
L.02
0.090
OH
Tukang Batu
L.03
0.009
OH
Kepala Tukang
L.04
0.027
OH
Mandor
B
Bahan
1.20
m'
Pipa Galvanis Ø ½"
0.35
Ls
Perlengkapan 35% x pipa
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
abk 10-14
No. 14
15
16
SNI
KODE
A.5.1.1.19
KOEF 1
bh
Pemasangan Kran Ø ½" atau Ø ¾"
A
Tenaga
L.01
0.010
OH
Pekerja
L.02
0.400
OH
Tukang Batu
L.03
0.040
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
1.00
bh
Kran Air
0.0025
bh
Sealtape
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa Galvanis Ø ¾"
A
Tenaga
A.5.1.1.20
1 L.01
0.054
OH
Pekerja
L.02
0.090
OH
Tukang Batu
L.03
0.009
OH
Kepala Tukang
L.04
0.027
OH
Mandor
B
Bahan
1.20
m'
Pipa Galvanis Ø ¾"
0.35
Ls
Perlengkapan 35% x pipa
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa Galvanis Ø 1"
A
Tenaga
A.5.1.1.21
1 L.01
0.054
OH
Pekerja
L.02
0.090
OH
Tukang Batu
L.03
0.009
OH
Kepala Tukang
L.04
0.027
OH
Mandor
B
Bahan
m'
Pipa Galvanis Ø 1"
1.20 414275883.xlsx432/335
URAIAN PEKERJAAN
SAT.
abk 10-14
No.
SNI
KODE
KOEF 0.35
17
18
A.5.1.1.22
1
Ls
Perlengkapan 35% x pipa
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa Galvanis Ø 1½ "
A
Tenaga
L.01
0.108
OH
Pekerja
L.02
0.180
OH
Tukang Batu
L.03
0.018
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
1.20
m'
Pipa Galvanis Ø 1½"
0.35
Ls
Perlengkapan 35% x pipa
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa Galvanis Ø 3"
A
Tenaga
A.5.1.1.23
414275883.xlsx432/336
URAIAN PEKERJAAN
SAT.
1 L.01
0.135
OH
Pekerja
L.02
0.225
OH
Tukang Batu
L.03
0.023
OH
Kepala Tukang
L.04
0.007
OH
Mandor
B
Bahan
1.20
m'
Pipa Galvanis Ø 3"
0.35
Ls
Perlengkapan 35% x pipa
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
abk 10-14
No.
SNI
19
A.5.1.1.24
20
21
KODE
URAIAN PEKERJAAN
SAT.
1
m'
Pemasangan Pipa Galvanis Ø 4"
A
Tenaga
L.01
0.135
OH
Pekerja
L.02
0.225
OH
Tukang Batu
L.03
0.023
OH
Kepala Tukang
L.04
0.007
OH
Mandor
B
Bahan
1.20
m'
Pipa Galvanis Ø 4"
0.35
Ls
Perlengkapan 35% x pipa
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa PVC tipe AW Ø ½"
A
Tenaga
A.5.1.1.25
1 L.01
0.036
OH
Pekerja
L.02
0.060
OH
Tukang Batu
L.03
0.006
OH
Kepala Tukang
L.04
0.002
OH
Mandor
B
Bahan
1.20
m'
Pipa PVC Ø ½"
0.35
Ls
Perlengkapan 35% x pipa
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa PVC tipe AW Ø ¾"
A
Tenaga
A.5.1.1.26
414275883.xlsx432/337
KOEF
1 L.01
0.036
OH
Pekerja
L.02
0.060
OH
Tukang Batu
L.03
0.006
OH
Kepala Tukang
L.04
0.002
OH
Mandor
B
Bahan abk 10-14
No.
22
23
SNI
KODE
A.5.1.1.27
URAIAN PEKERJAAN
SAT.
1.20
m'
Pipa PVC Ø ¾"
0.35
Ls
Perlengkapan 35% x pipa
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa PVC tipe AW Ø 1"
A
Tenaga
1 L.01
0.036
OH
Pekerja
L.02
0.060
OH
Tukang Batu
L.03
0.006
OH
Kepala Tukang
L.04
0.002
OH
Mandor
B
Bahan
1.20
m'
Pipa PVC Ø 1"
0.35
Ls
Perlengkapan 35% x pipa
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa PVC tipe AW Ø 1½"
A
Tenaga
A.5.1.1.28
414275883.xlsx432/338
KOEF
1 L.01
0.054
OH
Pekerja
L.02
0.090
OH
Tukang Batu
L.03
0.009
OH
Kepala Tukang
L.04
0.003
OH
Mandor
B
Bahan
1.20
m'
Pipa PVC Ø 1½"
0.35
Ls
Perlengkapan 35% x pipa
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
abk 10-14
No.
SNI
24
A.5.1.1.29
25
26
KODE
URAIAN PEKERJAAN
SAT.
1
m'
Pemasangan Pipa PVC tipe AW Ø 2"
A
Tenaga
L.01
0.054
OH
Pekerja
L.02
0.090
OH
Tukang Batu
L.03
0.009
OH
Kepala Tukang
L.04
0.003
OH
Mandor
B
Bahan
1.20
m'
Pipa PVC Ø 2"
0.35
Ls
Perlengkapan 35% x pipa
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa PVC tipe AW Ø 3"
A
Tenaga
A.5.1.1.31
1 L.01
0.081
OH
Pekerja
L.02
0.135
OH
Tukang Batu
L.03
0.0135
OH
Kepala Tukang
L.04
0.004
OH
Mandor
B
Bahan
1.20
m'
Pipa PVC Ø 3"
0.35
Ls
Perlengkapan 35% x pipa
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa PVC tipe AW Ø 4"
A
Tenaga
A.5.1.1.32
414275883.xlsx432/339
KOEF
1 L.01
0.036
OH
Pekerja
L.02
0.060
OH
Tukang Batu
L.03
0.006
OH
Kepala Tukang
L.04
0.002
OH
Mandor
B
Bahan abk 10-14
No.
27
28
SNI
KODE
A.5.1.1.33
URAIAN PEKERJAAN
SAT.
1.20
m'
Pipa PVC Ø 4"
0.35
Ls
Perlengkapan 35% x pipa
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm
A
Tenaga
1 L.01
0.080
OH
Pekerja
L.02
0.040
OH
Tukang Batu
L.03
0.004
OH
Kepala Tukang
L.04
0.004
OH
Mandor
B
Bahan
1.60
bh
pipa tanah
35.00
kg
Semen Portlan
0.014
m3
Pasir Pasang
0.014
m3
Pasir Urug
A.5.1.1.34
414275883.xlsx432/340
KOEF
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm
A
Tenaga
L.01
0.060
OH
Pekerja
L.02
0.030
OH
Tukang Batu
L.03
0.003
OH
Kepala Tukang
L.04
0.003
OH
Mandor
abk 10-14
No.
29
30
SNI
KODE
A.5.1.1.35
KOEF
B
Bahan
1.60
bh
pipa tanah
6.80
kg
Semen Portlan
0.013
m3
Pasir Pasang
0.011
m3
Pasir Urug
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa Beton Ø 20 cm
A
Tenaga
L.01
0.140
OH
Pekerja
L.02
0.070
OH
Tukang Batu
L.03
0.007
OH
Kepala Tukang
L.04
0.007
OH
Mandor
B
Bahan
1.10
bh
pipa beton
0.03
m3
Batu Bata
3.920
kg
Semen Portlan
0.056
m3
Pasir Pasang
0.024
m3
Pasir Urug
A.5.1.1.36
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Pipa Beton Ø 100 cm
A
Tenaga
L.01
0.380
OH
Pekerja
L.02
0.190
OH
Tukang Batu
L.03
0.019
OH
Kepala Tukang
L.04
0.019
OH
Mandor
B
Bahan
bh
pipa beton
1.10 414275883.xlsx432/341
URAIAN PEKERJAAN
SAT.
abk 10-14
No.
SNI
414275883.xlsx432/342
KODE
KOEF
URAIAN PEKERJAAN
SAT.
0.55
m3
Batu Bata
10.300
kg
Semen Portlan
0.061
m3
Pasir Pasang
0.069
m3
Pasir Urug
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
abk 10-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
PEKERJAAN SANITASI DALAM GEDUNG 1,779,873.70 293,067.00 57,000.00
188,100.00
84,000.00
92,400.00
87,000.00
87.00
78,000.00
12,480.00 1,325,000.00
1,250,000.00
1,250,000.00
1,250,000.00
75,000.00
1,618,067.00 161,806.70
10%
1,779,873.70
518,364.00 325,980.00 57,000.00
57,000.00
84,000.00
126,000.00
87,000.00
130,500.00
78,000.00
12,480.00 145,260.00
135,000.00
135,000.00
1,360.00
8,160.00
210,000.00
2,100.00
471,240.00 47,124.00
10%
518,364.00
685,036.00 157,500.00
414275883.xlsx432/343
57,000.00
57,000.00
84,000.00
84,000.00
87,000.00
8,700.00 abk 10-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
78,000.00
7,800.00 465,260.00
350,000.00
350,000.00
350,000.00
105,000.00
1,360.00
8,160.00
210,000.00
2,100.00
622,760.00 62,276.00
10%
685,036.00
666,259.00 101,430.00 57,000.00
68,400.00
84,000.00
12,180.00
87,000.00
13,050.00
78,000.00
7,800.00 504,260.00
380,000.00
380,000.00
380,000.00
114,000.00
1,360.00
8,160.00
210,000.00
2,100.00
605,690.00 60,569.00
10%
666,259.00
1,071,437.40 74,034.00
414275883.xlsx432/344
57,000.00
4,275.00
84,000.00
63,000.00
87,000.00
6,525.00
78,000.00
234.00
abk 10-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 900,000.00
750,000.00
750,000.00
750,000.00
150,000.00
974,034.00 97,403.40
10%
1,071,437.40
1,024,705.00 623,550.00
57,000.00
171,000.00
84,000.00
378,000.00
87,000.00
4,350.00
78,000.00
70,200.00 308,000.00
275,000.00
275,000.00
275,000.00
33,000.00
931,550.00 93,155.00
10%
1,024,705.00
1,283,947.90 622,440.00 57,000.00
342,000.00
84,000.00
252,000.00
87,000.00
26,100.00
78,000.00
2,340.00 544,785.37
520.00
78,000.00
0.11
1,360.00
163,200.00
0.0121
210,000.00
63,000.00
82.6446280992
518.29
186,585.37
9,000.00
54,000.00
1,167,225.37 414275883.xlsx432/345
abk 10-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 116,722.54
10%
1,283,947.90
336,259.00 30,690.00 57,000.00
1,710.00
84,000.00
25,200.00
87,000.00
2,610.00
78,000.00
1,170.00 275,000.00
225,000.00
225,000.00
50,000.00
50,000.00
305,690.00 30,569.00
10%
336,259.00
31,053.00 10,230.00 57,000.00
570.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
390.00 18,000.00
18,000.00
18,000.00
28,230.00 10%
2,823.00 31,053.00
414275883.xlsx432/346
abk 10-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
Kontrol Pas.Batu Bata 30x30 tinggi 35 cm
360,527.20 190,722.00 57,000.00
123,120.00
84,000.00
60,480.00
87,000.00
6,264.00
78,000.00
858.00 137,030.00
520.00
20,800.00
1,360.00
59,840.00
210,000.00
14,700.00
280,000.00
16,800.00
127,000.00
8,890.00
10,000.00
16,000.00
327,752.00 32,775.20
10%
360,527.20
Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm
542,701.50 281,205.00 57,000.00
182,400.00
84,000.00
96,600.00
87,000.00
957.00
78,000.00
1,248.00 212,160.00
520.00
36,400.00
1,360.00
104,720.00
210,000.00
27,300.00
280,000.00
25,200.00
127,000.00
2,540.00
10,000.00
16,000.00
493,365.00 10%
49,336.50 542,701.50
414275883.xlsx432/347
abk 10-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
Kontrol Pas.Batu Bata 60x60 tinggi 60 cm
662,843.50 281,205.00 57,000.00
182,400.00
84,000.00
96,600.00
87,000.00
957.00
78,000.00
1,248.00 321,380.00
520.00
63,960.00
1,360.00
155,040.00
210,000.00
38,640.00
127,000.00
15,240.00
10,000.00
48,500.00
602,585.00 60,258.50
10%
662,843.50
33,918.87 13,527.00 57,000.00
3,078.00
84,000.00
7,560.00
87,000.00
783.00
78,000.00
2,106.00 17,308.33
11,166.67
13,400.00
11,166.67
3,908.33
30,835.33 10%
3,083.53 33,918.87
414275883.xlsx432/348
abk 10-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 72,655.00 38,040.00
57,000.00
570.00
84,000.00
33,600.00
87,000.00
3,480.00
78,000.00
390.00 28,010.00
28,000.00
28,000.00
4,000.00
10.00
66,050.00 6,605.00
10%
72,655.00
37,613.03 13,527.00 57,000.00
3,078.00
84,000.00
7,560.00
87,000.00
783.00
78,000.00
2,106.00 20,666.67
13,333.33
16,000.00
13,333.33
4,666.67
34,193.67 3,419.37
10%
37,613.03
42,443.87 13,527.00 57,000.00
3,078.00
84,000.00
7,560.00
87,000.00
783.00
78,000.00
2,106.00 25,058.33
16,166.67 414275883.xlsx432/349
19,400.00 abk 10-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
16,166.67
5,658.33
38,585.33 3,858.53
10%
42,443.87
65,338.53 23,232.00 57,000.00
6,156.00
84,000.00
15,120.00
87,000.00
1,566.00
78,000.00
390.00 36,166.67
23,333.33
28,000.00
23,333.33
8,166.67
59,398.67 5,939.87
10%
65,338.53
165,614.53 29,142.00 57,000.00
7,695.00
84,000.00
18,900.00
87,000.00
2,001.00
78,000.00
546.00 121,416.67
78,333.33
94,000.00
78,333.33
27,416.67
150,558.67 10%
15,055.87 165,614.53
414275883.xlsx432/350
abk 10-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
270,756.20 29,142.00 57,000.00
7,695.00
84,000.00
18,900.00
87,000.00
2,001.00
78,000.00
546.00 217,000.00
140,000.00
168,000.00
140,000.00
49,000.00
246,142.00 24,614.20
10%
270,756.20
20,055.75 7,770.00 57,000.00
2,052.00
84,000.00
5,040.00
87,000.00
522.00
78,000.00
156.00 10,462.50
6,750.00
8,100.00
6,750.00
2,362.50
18,232.50 1,823.25
10%
20,055.75
22,613.25 7,770.00 57,000.00
2,052.00
84,000.00
5,040.00
87,000.00
522.00
78,000.00
156.00 12,787.50
414275883.xlsx432/351
abk 10-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
8,250.00
9,900.00
8,250.00
2,887.50
20,557.50 2,055.75
10%
22,613.25
27,728.25 7,770.00 57,000.00
2,052.00
84,000.00
5,040.00
87,000.00
522.00
78,000.00
156.00 17,437.50
11,250.00
13,500.00
11,250.00
3,937.50
25,207.50 2,520.75
10%
27,728.25
31,291.33 11,655.00 57,000.00
3,078.00
84,000.00
7,560.00
87,000.00
783.00
78,000.00
234.00 16,791.67
10,833.33
13,000.00
10,833.33
3,791.67
28,446.67 10%
2,844.67 31,291.33
414275883.xlsx432/352
abk 10-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
44,078.83 11,655.00 57,000.00
3,078.00
84,000.00
7,560.00
87,000.00
783.00
78,000.00
234.00 28,416.67
18,333.33
22,000.00
18,333.33
6,416.67
40,071.67 4,007.17
10%
44,078.83
76,021.18 17,443.50 57,000.00
4,617.00
84,000.00
11,340.00
87,000.00
1,174.50
78,000.00
312.00 51,666.67
33,333.33
40,000.00
33,333.33
11,666.67
69,110.17 6,911.02
10%
76,021.18
93,797.00 7,770.00 57,000.00
2,052.00
84,000.00
5,040.00
87,000.00
522.00
78,000.00
156.00 77,500.00
414275883.xlsx432/353
abk 10-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
50,000.00
60,000.00
50,000.00
17,500.00
85,270.00 8,527.00
10%
93,797.00
84,634.00
a Air Limbah Jenis Pipa Tanah Ø 20 cm
8,580.00 57,000.00
4,560.00
84,000.00
3,360.00
87,000.00
348.00
78,000.00
312.00 68,360.00
10,000.00
16,000.00
1,360.00
47,600.00
210,000.00
2,940.00
130,000.00
1,820.00 -
76,940.00 7,694.00
10%
84,634.00
35,907.30
a Air Limbah Jenis Pipa Tanah Ø 15 cm
6,435.00
414275883.xlsx432/354
57,000.00
3,420.00
84,000.00
2,520.00
87,000.00
261.00
78,000.00
234.00
abk 10-14
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
URAIAN PEKERJAAN
26,208.00 8,000.00
12,800.00
1,360.00
9,248.00
210,000.00
2,730.00
130,000.00
1,430.00
,
32,643.00 3,264.30
10%
35,907.30
92,681.82 15,015.00 57,000.00
7,980.00
84,000.00
5,880.00
87,000.00
609.00
78,000.00
546.00 69,241.20
35,000.00
38,500.00
390,000.00
10,530.00
1,360.00
5,331.20
210,000.00
11,760.00
130,000.00
3,120.00
84,256.20 8,425.62
10%
92,681.82
528,080.30 40,755.00 57,000.00
21,660.00
84,000.00
15,960.00
87,000.00
1,653.00
78,000.00
1,482.00 439,318.00
180,000.00 414275883.xlsx432/355
198,000.00 abk 10-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
390,000.00
214,500.00
1,360.00
14,008.00
210,000.00
12,810.00
130,000.00
8,970.00
480,073.00 10%
48,007.30 528,080.30
414275883.xlsx432/356
abk 10-14
No.
SNI
XI
A.4.2.1 1
KODE
KOEF
URAIAN PEKERJAAN
SAT.
HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM
A.4.2.1.1
1
Kg
Pemasangan Besi Profil
A
Tenaga
L.01
0.06
OH
Pekerja
L.02
0.06
OH
Tukang Besi
L.03
0.006
OH
Kepala Tukang
L.04
0.003
OH
Mandor
B
Bahan
1.15
Kg
Besi Profil
0.06
Kg
Meni Besi
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%)
2
A.4.2.1.2
1
414275883.xlsx
Pemasangan Rangka Kuda-kuda Baja IWF
A
Tenaga
L.01
0.06
OH
Pekerja
L.02
0.06
OH
Tukang Besi
L.03
0.006
OH
Kepala Tukang
L.04
0.003
OH
Mandor
B
Bahan
kg
Besi Baja IWF
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
kg
Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja)
A
Tenaga
1.15
3
kg
A.4.2.1.3
100
L.01
0.100
OH
Pekerja
L.02
0.100
OH
Tukang Besi
432/357
abk 11-14
No.
SNI
KODE
KOEF
L.03
0.001
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
1
ltr
Solar
0.1
ltr
Minyak Pelumas
C
PERALATAN
0.800
4
414275883.xlsx
URAIAN PEKERJAAN
SAT.
A.4.2.1.4
1
jam
Sewa Alat
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pembuatan Pintu Besi Plat Baja tebal 2 mm rangkap, rang
A
Tenaga
L.01
1.05
OH
Pekerja
L.02
1.05
OH
Tukang Besi
L.03
0.105
OH
Kepala Tukang
L.04
0.052
OH
Mandor
B
Bahan
15
Kg
Besi Siku L.30.30.3
32.8
Kg
Besi Plat Baja
0.05
Kg
Kawat Las
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/358
abk 11-14
No. 5
SNI
KODE
A.4.2.1.5
KOEF 10
414275883.xlsx
Pengerjaan Pengelasan dengan Las Listrik
A
Tenaga
0.04
OH
Pekerja
L.02
0.02
OH
Tukang Besi
L.03
0.002
OH
Kepala Tukang
L.04
0.002
OH
Mandor
B
Bahan
0.04
kg
Kawat Las
0.03
ltr
Solar
0.004
ltr
Minyak Pelumas
C
PERALATAN
A.4.2.1.7
1
jam
Sewa Alat
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Pintu Rolling Door Besi
A
Tenaga
L.01
1.2
OH
Pekerja
L.02
1.2
OH
Tukang Besi
L.03
0.12
OH
Kepala Tukang
L.04
0.006
OH
Mandor
B
Bahan
1
7
cm
L.01
0.170
6
URAIAN PEKERJAAN
SAT.
A.4.2.1.8
1
m2
Pintu Gulung Besi
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Pintu Lipat (Folding Door)
A
Tenaga
L.01
0.44
OH
Pekerja
L.02
0.44
OH
Tukang Besi
432/359
abk 11-14
No.
SNI
KODE
KOEF
L.03
0.044
OH
Kepala Tukang
L.04
0.022
OH
Mandor
B
Bahan
1
8
A.4.2.1.9
1
414275883.xlsx
m2
Pintu Lipat
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Sunscreen Allumunium
A
Tenaga
L.01
0.08
OH
Pekerja
L.02
0.8
OH
Tukang Besi
L.03
0.08
OH
Kepala Tukang
L.04
0.004
OH
Mandor
B
Bahan
1
9
URAIAN PEKERJAAN
SAT.
A.4.2.1.10
1
m2
Sunscreen Allumunium
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Rolling Door Allumunium
A
Tenaga
L.01
1
OH
Pekerja
L.02
1
OH
Tukang Besi
L.03
0.1
OH
Kepala Tukang
L.04
0.05
OH
Mandor
432/360
abk 11-14
No.
SNI
KODE
KOEF
B 1
10
A.4.2.1.11
URAIAN PEKERJAAN
SAT.
1
Bahan
m2
Rolling Allumunium
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Kusen Pintu Allumunium
A
Tenaga
L.01
0.043
OH
Pekerja
L.02
0.043
OH
Tukang Besi
L.03
0.0043
OH
Kepala Tukang
L.04
0.0021
OH
Mandor
B
Bahan
m'
Profil Allumunium
1.1
2 buah Skrup Fixer 0.06 Tube Sealant
11
414275883.xlsx
A.4.2.1.12
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Pintu Allumunium Strip Lebar 8 cm
A
Tenaga
L.01
0.085
OH
Pekerja
L.02
0.085
OH
Tukang Besi
L.03
0.0085
OH
Kepala Tukang
L.04
0.0042
OH
Mandor
B
Bahan
4.4
m'
Profil Allumunium
14.6
m'
Allumunium Strip
C
PERALATAN
D
Jumlah A + B + C 432/361
abk 11-14
No.
12
SNI
KODE
A.4.2.1.13
KOEF
URAIAN PEKERJAAN
SAT.
1
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Pintu Kaca Rangka Allumunium
A
Tenaga
L.01
0.085
OH
Pekerja
L.02
0.085
OH
Tukang Besi
L.03
0.009
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
4.4
m'
Pintu Allumunium
4.5
m'
Profil Kaca
0.27 tube Sealant
13
414275883.xlsx
A.4.2.1.14
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Venetions Blinds & Vertical Blinds
A
Tenaga
L.01
0.35
OH
Pekerja
L.02
0.35
OH
Tukang Besi
L.03
0.035
OH
Kepala Tukang
L.04
0.018
OH
Mandor
432/362
abk 11-14
No.
SNI
KODE
KOEF
B 1
14
15
414275883.xlsx
A.4.2.1.15
URAIAN PEKERJAAN
SAT.
1
Bahan
m2
Venetions Blinds atau Vertical Blinds (tirai)
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Terali Besi Strip (2x3) cm
A
Tenaga
L.01
1.67
OH
Pekerja
L.02
1.67
OH
Tukang Las
L.03
0.167
OH
Kepala Tukang
L.04
0.083
OH
Mandor
B
Bahan
6.177
m'
Besi Strip 2x3
27.08
cm
Pengelasan
A.4.2.1.16
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Kawat Nyamuk
A
Tenaga
L.01
0.1
OH
Pekerja
L.02
0.1
OH
Tukang Kayu
L.03
0.01
OH
Kepala Tukang
L.04
0.0050
OH
Mandor
B
Bahan
1.1
m2
Kawat Nyamuk nylon
11.11
cm
Pengelasan
1.716
kg
Baja Strip (0,2x2) cm
C
PERALATAN
D
Jumlah A + B + C 432/363
abk 11-14
No.
16
SNI
KODE
A.4.2.1.17
KOEF
1
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Jendela Nako & Tralis
A
Tenaga
0.2
OH
Pekerja
L.02
0.2
OH
Tukang Kayu
L.03
0.02
OH
Kepala Tukang
L.04
0.001
OH
Mandor
B
Bahan
10 7
414275883.xlsx
E
L.01
1.1
17
URAIAN PEKERJAAN
SAT.
A.4.2.1.18
1
m2
Jendela Nako
buah Paku Skrup 1 - 2,5 cm m'
Besi Strip
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 c
A
Tenaga
L.01
0.20
OH
Pekerja
L.02
0.4
OH
Tukang Kayu
L.03
0.025
OH
Kepala Tukang
L.04
0.01
OH
Mandor
432/364
abk 11-14
No.
SNI
KODE
KOEF
B
18
19
A.4.2.1.19
Bahan
1.05
Lbr
Seng Plaat
0.015
Kg
Paku Biasa 1 - 2,5 cm
0.019
m3
Kayu Papan Klas II atau III
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJ
A
Tenaga
L.01
0.15
OH
Pekerja
L.02
0.3
OH
Tukang Kayu
L.03
0.03
OH
Kepala Tukang
L.04
0.008
OH
Mandor
B
Bahan
A.4.2.1.20
1.05
Lbr
Seng Plaat
0.01
Kg
Paku Biasa 1 - 2,5 cm
0.5
Kg
Besi strip
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 6
A
Tenaga
L.01
0.250
OH
Pekerja
L.02
0.250
OH
Tukang Besi
L.03
0.025
OH
Kepala Tukang
L.04
0.013
OH
Mandor
B
Bahan
m'
Rangka metal hollow 40.40.2 mm
3.50 1.00 414275883.xlsx
URAIAN PEKERJAAN
SAT.
Assesoris (perkuatan; las dll) 432/365
abk 11-14
No.
20
SNI
KODE
A.4.2.1.21
KOEF
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 6
A
Tenaga
L.01
0.350
OH
Pekerja
L.02
0.350
OH
Tukang Besi
L.03
0.035
OH
Kepala Tukang
L.04
0.018
OH
Mandor
B
Bahan
m'
Rangka metal hollow 40.40.2 mm
4.00 1.00
414275883.xlsx
URAIAN PEKERJAAN
SAT.
Assesoris (perkuatan; las dll)
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
432/366
abk 11-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
PEKERJAAN BESI & ALLUMUNIUM 27,968.60 9,216.00 57,000.00
3,420.00
84,000.00
5,040.00
87,000.00
522.00
78,000.00
234.00 16,210.00
13,000.00
14,950.00
21,000.00
1,260.00
25,426.00 2,542.60
10%
27,968.60
26,582.60 9,216.00 57,000.00
3,420.00
84,000.00
5,040.00
87,000.00
522.00
78,000.00
234.00 14,950.00
13,000.00
14,950.00
24,166.00 2,416.60
10%
26,582.60
aan Perakitan (Kuda-kuda Baja)
72,739.70 14,577.00
414275883.xlsx
57,000.00
5,700.00
84,000.00
8,400.00
432/367
abk 11-14
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
URAIAN PEKERJAAN
87,000.00
87.00
78,000.00
390.00 15,550.00
11,300.00
11,300.00
42,500.00
4,250.00 36,000
45,000
36,000 66,127.00 6,612.70
10%
72,739.70
Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku
845,725.10 161,241.00 57,000.00
59,850.00
84,000.00
88,200.00
87,000.00
9,135.00
78,000.00
4,056.00 607,600.00
13,000.00
195,000.00
12,500.00
410,000.00
52,000.00
2,600.00
768,841.00 76,884.10
10%
845,725.10
414275883.xlsx
432/368
abk 11-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 15,981.90 4,290.00
57,000.00
2,280.00
84,000.00
1,680.00
87,000.00
174.00
78,000.00
156.00 2,589.00
52,000.00
2,080.00
11,300.00
339.00
42,500.00
170.00 7,650
45,000
7,650 14,529.00 1,452.90
10%
15,981.90
550,118.80 180,108.00 57,000.00
68,400.00
84,000.00
100,800.00
87,000.00
10,440.00
78,000.00
468.00 320,000.00
320,000.00
320,000.00
500,108.00 50,010.80
10%
550,118.80
525,342.40 67,584.00
414275883.xlsx
57,000.00
25,080.00
84,000.00
36,960.00
432/369
abk 11-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
87,000.00
3,828.00
78,000.00
1,716.00 410,000.00
410,000.00
410,000.00
477,584.00 47,758.40
10%
525,342.40
455,435.20 79,032.00 57,000.00
4,560.00
84,000.00
67,200.00
87,000.00
6,960.00
78,000.00
312.00 335,000.00
335,000.00
335,000.00
414,032.00 41,403.20
10%
455,435.20
454,960.00 153,600.00
414275883.xlsx
57,000.00
57,000.00
84,000.00
84,000.00
87,000.00
8,700.00
78,000.00
3,900.00
432/370
abk 11-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 260,000.00
260,000.00
260,000.00
413,600.00 41,360.00
10%
454,960.00
112,640.99 6,600.90 57,000.00
2,451.00
84,000.00
3,612.00
87,000.00
374.10
78,000.00
163.80 95,800.00
83,000.00
91,300.00
750.00
1,500.00
50,000.00
3,000.00
102,400.90 10,240.09
10%
112,640.99
u Allumunium Strip Lebar 8 cm
488,347.31 13,052.10 57,000.00
4,845.00
84,000.00
7,140.00
87,000.00
739.50
78,000.00
327.60 430,900.00
83,000.00
365,200.00
4,500.00
65,700.00
443,952.10 414275883.xlsx
432/371
abk 11-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 44,395.21
10%
488,347.31
u Kaca Rangka Allumunium
455,793.80 13,158.00 57,000.00
4,845.00
84,000.00
7,140.00
87,000.00
783.00
78,000.00
390.00 401,200.00
83,000.00
365,200.00
5,000.00
22,500.00
50,000.00
13,500.00
414,358.00 41,435.80
10%
455,793.80
etions Blinds & Vertical Blinds
163,678.90 53,799.00
414275883.xlsx
57,000.00
19,950.00
84,000.00
29,400.00
87,000.00
3,045.00
78,000.00
1,404.00
432/372
abk 11-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 95,000.00
95,000.00
95,000.00
148,799.00 14,879.90
10%
163,678.90
338,220.56 256,473.00 57,000.00
95,190.00
84,000.00
140,280.00
87,000.00
14,529.00
78,000.00
6,474.00 51,000.24
1,250.00
7,721.25
1,598.19
43,278.99
307,473.24 30,747.32
10%
338,220.56
49,676.98 15,360.00 57,000.00
5,700.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
390.00 29,800.89
9,000.00
9,900.00
1,598.19
17,755.89
1,250.00
2,145.00
45,160.89 414275883.xlsx
432/373
abk 11-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 4,516.09
10%
49,676.98
64,204.80 30,018.00 57,000.00
11,400.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
78.00 28,350.00
12,500.00
13,750.00
200.00
2,000.00
1,800.00
12,600.00
58,368.00 5,836.80
10%
64,204.80
ng Datar/Jurai , Seng BJLS 28 Lebar 90 cm
172,716.50 47,955.00
414275883.xlsx
57,000.00
11,400.00
84,000.00
33,600.00
87,000.00
2,175.00
78,000.00
780.00
432/374
abk 11-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 109,060.00
15,000.00
15,750.00
14,000.00
210.00
4,900,000.00
93,100.00
157,015.00 15,701.50
10%
172,716.50
ng 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm
65,036.40 36,984.00 57,000.00
8,550.00
84,000.00
25,200.00
87,000.00
2,610.00
78,000.00
624.00 22,140.00
15,000.00
15,750.00
14,000.00
140.00
12,500.00
6,250.00
59,124.00 5,912.40
10%
65,036.40
gka Besi Hollow 1 x 40.40.2mm; Modul 60x120 cm dinding partisi
157,782.90 38,439.00
57,000.00
14,250.00
84,000.00
21,000.00
87,000.00
2,175.00
78,000.00
1,014.00 105,000.00
414275883.xlsx
15,000.00
52,500.00
52,500.00
52,500.00
432/375
abk 11-14
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
143,439.00 14,343.90
10%
157,782.90
gka Besi Hollow 1 x 40.40.2mm; Modul 60x60 cm dinding plafond
191,178.90 53,799.00
57,000.00
19,950.00
84,000.00
29,400.00
87,000.00
3,045.00
78,000.00
1,404.00 120,000.00
15,000.00
60,000.00
60,000.00
60,000.00
173,799.00 17,379.90
10%
191,178.90
414275883.xlsx
432/376
abk 11-14
No.
XII 1
SNI
KODE
KOEF
URAIAN PEKERJAAN
SAT.
A.4.6.2
HARGA SATUAN PEKERJAAN KUNCI dan KACA
A.4.6.2.2
1 Buah Pemasangan Kunci Tanam Biasa A
Tenaga
L.01
0.01
OH
Pekerja
L.02
0.5
OH
Tukang Kayu
L.03
0.01
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
1
Buah
Kunci Tanam Biasa
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%)
2
A.4.6.2.3
1 Buah A
Tenaga
L.01
0.005
OH
Pekerja
L.02
0.5
OH
Tukang Kayu
L.03
0.005
OH
Kepala Tukang
L.04
0.0025
OH
Mandor
B
Bahan
1 Buah
3
Pemasangan Kunci Kamar Mandi
A.4.6.2.4
Kunci Tanam Kamar Mandi
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1 Buah
Pemasangan Kunci Selinder
A
Tenaga
L.01
0.005
OH
Pekerja
L.02
0.5
OH
Tukang Kayu
L.03
0.005
OH
Kepala Tukang
L.04
0.0025
OH
Mandor
B
Bahan
1 Buah
Kunci Selinder
No.
4
SNI
KODE
A.4.6.2.5
KOEF
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1 Buah
Pemasangan Engsel Pintu
A
Tenaga
L.01
0.015
OH
Pekerja
L.02
0.15
OH
Tukang Kayu
L.03
0.015
OH
Kepala Tukang
L.04
0.0075
OH
Mandor
B
Bahan
1
5
URAIAN PEKERJAAN
SAT.
A.4.6.2.6
Buah
Engsel pintu
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1 Buah Pemasangan Engsel Jendela Kupu-kupu A
Tenaga
L.01
0.01
OH
Pekerja
L.02
0.1
OH
Tukang Kayu
L.03
0.01
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
1
Buah
Engsel Jendela
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
No.
SNI
6
A.4.6.2.7
KODE
KOEF
1 Buah Pemasangan Engsel Angin Tenaga
0.10
OH
Pekerja
L.02
0.20
OH
Tukang Kayu
L.03
0.02
OH
Kepala Tukang
L.04
0.0005
OH
Mandor
B
Bahan
A.4.6.2.9
Buah
Engsel Angin
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1 Buah Pemasangan Kait Angin A
Tenaga
L.01
0.015
OH
Pekerja
L.02
0.15
OH
Tukang Kayu
L.03
0.015
OH
Kepala Tukang
L.04
0.008
OH
Mandor
B
Bahan
1
8
A L.01
1
7
URAIAN PEKERJAAN
SAT.
A.4.6.2.10
Buah
Kait Angin
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1 Buah Pasang Door Closer A
Tenaga
L.01
0.05
OH
Pekerja
L.02
0.5
OH
Tukang Kayu
L.03
0.05
OH
Kepala Tukang
L.04
0.0025
OH
Mandor
B
Bahan
1
Buah C
Door Closer PERALATAN
No.
9
SNI
KODE
A.4.6.2.11
KOEF
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1 Buah Pemasangan Kunci Selot A
Tenaga
L.01
0.02
OH
Pekerja
L.02
0.2
OH
Tukang Kayu
L.03
0.02
OH
Kepala Tukang
L.04
0.001
OH
Mandor
B
Bahan
1
10
URAIAN PEKERJAAN
SAT.
A.4.6.2.13
Buah
Kunci Selot
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1 Buah Pemasangan Door Stop A
Tenaga
L.01
0.01
OH
Pekerja
L.02
0.1
OH
Tukang Kayu
L.03
0.01
OH
Kepala Tukang
L.04
0.0005
OH
Mandor
B
Bahan
1
Buah
Door Stop
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
No.
SNI
11
A.4.6.2.14
KODE
KOEF
1 Buah Pemasangan Rel Pintu Dorong Tenaga
0.06
OH
Pekerja
L.02
0.6
OH
Tukang Kayu
L.03
0.06
OH
Kepala Tukang
L.04
0.003
OH
Mandor
B
Bahan
A.4.6.2.15
Buah
Rel Pintu Dorong
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1 Buah Pemasangan Kunci Lemari A
Tenaga
L.01
0.025
OH
Pekerja
L.02
0.25
OH
Tukang Kayu
L.03
0.025
OH
Kepala Tukang
L.04
0.00130
OH
Mandor
B
Bahan
1
13
A L.01
1
12
URAIAN PEKERJAAN
SAT.
A.4.6.2.16
1
Buah
Kunci Lemari
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Kaca tebal 3 mm
A
Tenaga
L.01
0.015
OH
Pekerja
L.02
0.15
OH
Tukang Kayu
L.03
0.015
OH
Kepala Tukang
L.04
0.00075
OH
Mandor
B
Bahan
1.1
m2 C
Kaca tebal 3mm PERALATAN
No.
14
SNI
KODE
A.4.6.2.17
KOEF
1
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Kaca tebal 5 mm
A
Tenaga
L.01
0.015
OH
Pekerja
L.02
0.15
OH
Tukang Kayu
L.03
0.015
OH
Kepala Tukang
L.04
0.00075
OH
Mandor
B
Bahan
1.1
15
URAIAN PEKERJAAN
SAT.
A.4.6.2.18
1
m2
Kaca tebal 5mm
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Kaca Cermin tebal 5 mm
A
Tenaga
L.01
0.015
OH
Pekerja
L.02
0.15
OH
Tukang Kayu
L.03
0.015
OH
Kepala Tukang
L.04
0.00075
OH
Mandor
B
Bahan
1.1
m2
Kaca Cermin
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
N PEKERJAAN KUNCI dan KACA 213,213.00 43,830.00 57,000.00
570.00
84,000.00
42,000.00
87,000.00
870.00
78,000.00
390.00 150,000.00
150,000.00
150,000.00
193,830.00 19,383.00
10%
213,213.00
144,006.50 42,915.00 57,000.00
285.00
84,000.00
42,000.00
87,000.00
435.00
78,000.00
195.00 88,000.00
88,000.00
88,000.00
130,915.00 13,091.50
10%
144,006.50
212,206.50 42,915.00 57,000.00
285.00
84,000.00
42,000.00
87,000.00
435.00
78,000.00
195.00 150,000.00
150,000.00
150,000.00
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
192,915.00 19,291.50
10%
212,206.50
25,679.50 15,345.00 57,000.00
855.00
84,000.00
12,600.00
87,000.00
1,305.00
78,000.00
585.00 8,000.00
8,000.00
8,000.00
23,345.00 2,334.50
10%
25,679.50
16,203.00 10,230.00 57,000.00
570.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
390.00 4,500.00
4,500.00
4,500.00
14,730.00 10%
1,473.00 16,203.00
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 43,756.90 24,279.00
57,000.00
5,700.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
39.00 15,500.00
15,500.00
15,500.00
39,779.00 3,977.90
10%
43,756.90
30,672.40 15,384.00 57,000.00
855.00
84,000.00
12,600.00
87,000.00
1,305.00
78,000.00
624.00 12,500.00
12,500.00
12,500.00
27,884.00 2,788.40
10%
30,672.40
384,334.50 49,395.00 57,000.00
2,850.00
84,000.00
42,000.00
87,000.00
4,350.00
78,000.00
195.00 300,000.00
300,000.00
300,000.00
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 349,395.00 34,939.50
10%
384,334.50
39,333.80 19,758.00 57,000.00
1,140.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
78.00 16,000.00
16,000.00
16,000.00
35,758.00 3,575.80
10%
39,333.80
340,866.90 9,879.00 57,000.00
570.00
84,000.00
8,400.00
87,000.00
870.00
78,000.00
39.00 300,000.00
300,000.00
300,000.00
309,879.00 10%
30,987.90 340,866.90
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 296,201.40 59,274.00
57,000.00
3,420.00
84,000.00
50,400.00
87,000.00
5,220.00
78,000.00
234.00 210,000.00
210,000.00
210,000.00
269,274.00 26,927.40
10%
296,201.40
32,671.54 24,701.40 57,000.00
1,425.00
84,000.00
21,000.00
87,000.00
2,175.00
78,000.00
101.40 5,000.00
5,000.00
5,000.00
29,701.40 2,970.14
10%
32,671.54
90,110.35 14,818.50 57,000.00
855.00
84,000.00
12,600.00
87,000.00
1,305.00
78,000.00
58.50 67,100.00
61,000.00
67,100.00
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 81,918.50 8,191.85
10%
90,110.35
103,420.35 14,818.50 57,000.00
855.00
84,000.00
12,600.00
87,000.00
1,305.00
78,000.00
58.50 79,200.00
72,000.00
79,200.00
94,018.50 9,401.85
10%
103,420.35
336,950.35 14,818.50 57,000.00
855.00
84,000.00
12,600.00
87,000.00
1,305.00
78,000.00
58.50 291,500.00
265,000.00
291,500.00
306,318.50 10%
30,631.85 336,950.35
No. XIII 1
SNI
KODE
KOEF
A.4.4.3
HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan D
A.4.4.3.2
1
A
Tenaga
OH
Pekerja
L.02
0.125
OH
Tukang Batu
L.03
0.013
OH
Kepala Tukang
L.04
0.013
OH
Mandor
B
Bahan
A.4.4.3.3
A.4.4.3.5
Pemasangan lantai Ubin PC Abu-abu Uk. 30 x 30 cm
0.25
Buah Ubin Abu-abu 30x30 cm
10.0
Kg
Portland Semen
0.0450
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan lantai Ubin PC Abu-abu Uk. 20 x 20 cm
A
Tenaga
L.01
0.27
OH
Pekerja
L.02
0.135
OH
Tukang Batu
L.03
0.014
OH
Kepala Tukang
L.04
0.014
OH
Mandor
B
Bahan
26.5
3
m2
L.01
11.87
2
URAIAN PEKERJAAN
SAT.
Buah Ubin Abu-abu 20x20 cm
10.4
Kg
Portland Semen
0.0450
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2 A
Pemasangan lantai Ubin PC Warna Uk. 30 x 30 cm Tenaga
No.
SNI
KODE
KOEF
L.01
0.26
OH
Pekerja
L.02
0.130
OH
Tukang Batu
L.03
0.013
OH
Kepala Tukang
L.04
0.013
OH
Mandor
B
Bahan
11.87
4
URAIAN PEKERJAAN
SAT.
A.4.4.3.6
Buah Ubin Warna 30x30 cm
10.0
Kg
Portland Semen
1.50
Kg
Semen warna
0.0450
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan lantai Ubin PC Warna Uk. 20 x 20 cm
A
Tenaga
L.01
0.27
OH
Pekerja
L.02
0.135
OH
Tukang Batu
L.03
0.014
OH
Kepala Tukang
L.04
0.014
OH
Mandor
B
Bahan
26.5
Buah Ubin Warna 20x20 cm
10.4
Kg
Portland Semen
1.62
Kg
Semen warna
0.0450
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
No.
SNI
5
A.4.4.3.9
KODE
KOEF 1
Pemasangan lantai Ubin Granito Uk. 40 x 40 cm
A
Tenaga
0.250
OH
Pekerja
L.02
0.125
OH
Tukang Batu
L.03
0.013
OH
Kepala Tukang
L.04
0.013
OH
Mandor
B
Bahan
A.4.4.3.16
Buah Ubin Granito 40x40 cm
9.8
Kg
Portland Semen
1.300
Kg
Semen warna
0.045
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Ubin Plin Pc.Abu-abu Uk. 15 x 20 cm
A
Tenaga
1
L.01
0.090
OH
Pekerja
L.02
0.090
OH
Tukang Batu
L.03
0.009
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
5.30
7
m2
L.01
6.63
6
URAIAN PEKERJAAN
SAT.
A.4.4.3.19
1.2
Kg
Portland Semen
0.045
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Ubin Plin Pc.Warna Uk. 10 x 20 cm
A
Tenaga
OH
Pekerja
1
L.01
Buah Ubin Plin Pc Abu-abu 15x20 cm
0.090
No.
SNI
KODE
KOEF
L.02
0.090
OH
Tukang Batu
L.03
0.009
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
2.65
8
URAIAN PEKERJAAN
SAT.
A.4.4.3.32
Buah Ubin Plin Pc SWarna 15x20 cm
1.14
Kg
Portland Semen
0.100
Kg
Semen Warna
0.003
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Lantai Keramik 10x 20 cm
A
Tenaga
L.01
0.70
OH
Pekerja
L.02
0.350
OH
Tukang Batu
L.03
0.035
OH
Kepala Tukang
L.04
0.035
OH
Mandor
B
Bahan
53.00
Buah Keramik 10 x 20 cm
8.2
Kg
Portland Semen
2.75
Kg
Semen Warna
0.0450
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
No.
SNI
9
A.4.4.3.33
KODE
KOEF 1
A
Tenaga
OH
Pekerja
L.02
0.350
OH
Tukang Batu
L.03
0.035
OH
Kepala Tukang
L.04
0.035
OH
Mandor
B
Bahan
A.4.4.3.34
A.4.4.3.35
Pemasangan lantai Keramik Uk. 10 x 10 cm / 5 x 20 cm
0.70
Buah Keramik 10 x 10 cm / 5 x 20 cm
8.19
Kg
Portland Semen
3.20
Kg
Semen Warna
0.0450
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Lantai Keramik 33 x 33 cm
A
Tenaga
L.01
0.70
OH
Pekerja
L.02
0.35
OH
Tukang Batu
L.03
0.035
OH
Kepala Tukang
L.04
0.035
OH
Mandor
B
Bahan
10
11
m2
L.01
106.00
10
URAIAN PEKERJAAN
SAT.
Buah Ubin Keramik 33 x 33 cm
8.19
Kg
Portland Semen
0.045
m3
Pasir Pasang
1.62
Kg
Semen Warna
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2 A
Pemasangan Lantai Keramik 30 x 30 cm Tenaga
No.
SNI
KODE
KOEF
L.01
0.70
OH
Pekerja
L.02
0.35
OH
Tukang Batu
L.03
0.035
OH
Kepala Tukang
L.04
0.035
OH
Mandor
B
Bahan
11.87
12
URAIAN PEKERJAAN
SAT.
A.4.4.3.36
Buah Ubin Keramik 30 x 30 cm
10.00
Kg
Portland Semen
0.045
m3
Pasir Pasang
1.50
Kg
Semen Warna
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Lantai Keramik 20 x 20 cm
A
Tenaga
L.01
0.70
OH
Pekerja
L.02
0.35
OH
Tukang Batu
L.03
0.035
OH
Kepala Tukang
L.04
0.035
OH
Mandor
B
Bahan
26.5
Buah Ubin Keramik 20 x 20 cm
10.40
Kg
Portland Semen
1.62
Kg
Semen Warna
0.045
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
No.
SNI
13
A.4.4.3.37
KODE
KOEF 1
m2
Pemasangan Lantai Keramik uk.10 x 33 cm, untuk varias
A
Tenaga
L.01
1.05
OH
Pekerja
L.02
0.525
OH
Tukang Batu
L.03
0.053
OH
Kepala Tukang
L.04
0.035
OH
Mandor
B
Bahan
33.0
14
URAIAN PEKERJAAN
SAT.
A.4.4.3.39
Buah Ubin Keramik
9.80
Kg
Portland Semen
4.37
Kg
Semen Warna
0.045
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Plint Keramik Ukuran 10x20 cm
A
Tenaga
1
L.01
0.09
OH
Pekerja
L.02
0.09
OH
Tukang Batu
L.03
0.009
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
5.3 Buah Ubin Keramik
15
A.4.4.3.40
1.14
Kg
Portland Semen
0.003
m3
Pasir Pasang
0.025
Kg
Semen Warna
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Plint Keramik Ukuran 10x10 cm
A
Tenaga
OH
Pekerja
1
L.01
0.09
No.
SNI
KODE
KOEF
URAIAN PEKERJAAN
SAT.
L.02
0.09
OH
Tukang Batu
L.03
0.009
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
10.6 Buah Ubin Keramik
16
A.4.4.3.41
1.14
Kg
Portland Semen
0.003
m3
Pasir Pasang
0.05
Kg
Semen Warna
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Plint Keramik Ukuran 5x20 cm
A
Tenaga
1
L.01
0.09
OH
Pekerja
L.02
0.09
OH
Tukang Batu
L.03
0.009
OH
Kepala Tukang
L.04
0.005
OH
Mandor
B
Bahan
10.6 Buah Ubin Keramik 1.14
Kg
Portland Semen
0.003
m3
Pasir Pasang
0.05
Kg
Semen Warna
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
No.
SNI
17
A.4.4.3.43
KODE
KOEF
URAIAN PEKERJAAN
SAT. 1
m2
Pemasangan Lantai Marmer Ukuran 1.00x1.00 cm
A
Tenaga
L.01
0.7
OH
Pekerja
L.02
0.35
OH
Tukang Batu
L.03
0.035
OH
Kepala Tukang
L.04
0.035
OH
Mandor
B
Bahan
1.06 buah Marmer
18
19
A.4.4.3.44
8.19
kg
Portland Semen
0.045
m3
Pasir Pasang
0.65
kg
Semen Warna
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Lantai Karpet
A
Tenaga
L.01
0.17
OH
Pekerja
L.02
0.17
OH
Tukang Batu
L.03
0.017
OH
Kepala Tukang
L.04
0.009
OH
Mandor
B
Bahan
1.05
m2
Karpet
0.35
kg
Lem
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.4.4.3.46
1
m2
Pemasangan Lantai Parquet Jati
A
Tenaga
L.01
0.70
OH
Pekerja
L.02
0.35
OH
Tukang Batu
L.03
0.035
OH
Kepala Tukang
No.
SNI
KODE L.04
20
21
A.4.4.3.48
KOEF
URAIAN PEKERJAAN
SAT.
0.035
OH
Mandor
B
Bahan
1.05
m2
Parquet Jati
0.6
Kg
Lem Vynil
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding Porselen 11 x 11 cm
A
Tenaga
L.01
1.00
OH
Pekerja
L.02
0.50
OH
Tukang Batu
L.03
0.050
OH
Kepala Tukang
L.04
0.050
OH
Mandor
B
Bahan
86
bh
Porselen
9.30
Kg
Portland Semen
2.750
Kg
Semen Warna
0.018
m3
Pasir Pasang
A.4.4.3.49
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Dinding Keramik 10x20 cm,
A
Tenaga
L.01
0.9
OH
Pekerja
L.02
0.45
OH
Tukang Batu
L.03
0.045
OH
Kepala Tukang
L.04
0.045
OH
Mandor
No.
SNI
KODE
KOEF
B 53
22
A.4.4.3.50
Bahan
Buah Keramik
9.3
Kg
Portland Semen
0.018
m3
Pasir Pasang
2.75
Kg
Semen Warna
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding Keramik 20x20 cm,
A
Tenaga
L.01
0.9
OH
Pekerja
L.02
0.45
OH
Tukang Batu
L.03
0.045
OH
Kepala Tukang
L.04
0.045
OH
Mandor
B
Bahan
26.0
23
URAIAN PEKERJAAN
SAT.
A.4.4.3.53
Buah Keramik
9.3
Kg
Portland Semen
0.018
m3
Pasir Pasang
1.94
Kg
Semen Warna
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding Keramik 10x20 cm,
A
Tenaga
L.01
0.9
OH
Pekerja
L.02
0.45
OH
Tukang Batu
L.03
0.045
OH
Kepala Tukang
L.04
0.045
OH
Mandor
B
Bahan
53.0 9.3
Buah Keramik Kg
Portland Semen
No.
23
SNI
KODE
A.4.4.3.54
KOEF 0.018
m3
Pasir Pasang
2.75
Kg
Semen Warna
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding Keramik 20x20 cm,
A
Tenaga
L.01
0.9
OH
Pekerja
L.02
0.45
OH
Tukang Batu
L.03
0.045
OH
Kepala Tukang
L.04
0.045
OH
Mandor
B
Bahan
26.5
24
URAIAN PEKERJAAN
SAT.
A.4.4.3.55
Buah Keramik
9.3
Kg
Portland Semen
0.018
m3
Pasir Pasang
1.94
Kg
Semen Warna
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding Marmer Ukuran 1.00x1.00 cm
A
Tenaga
L.01
1.3
OH
Pekerja
L.02
0.65
OH
Tukang Batu
L.03
0.065
OH
Kepala Tukang
L.04
0.065
OH
Mandor
No.
SNI
KODE
KOEF
URAIAN PEKERJAAN
SAT. B
Bahan
1.06 buah Marmer 3.003 buah Paku 12 cm
25
26
A.4.4.3.58
12.44
kg
Portlan Semen
0.025
m3
Pasir Pasang
0.65
kg
Semen Warna
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Dinding Batu Paros / Batu Tempel Hitam
A
Tenaga
L.01
0.70
OH
Pekerja
L.02
0.35
OH
Tukang Batu
L.03
0.035
OH
Kepala Tukang
L.04
0.035
OH
Mandor
B
Bahan
A.4.4.3.59
1.10
m2
Batu Paros
11.75
Kg
Portland Semen
0.035
m3
Pasir Pasang
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2
Pemasangan Lantai Vynil uk.30 x 30 cm
A
Tenaga
L.01
0.35
OH
Pekerja
L.02
0.175
OH
Tukang Batu
L.03
0.017
OH
Kepala Tukang
L.04
0.002
OH
Mandor
B
Bahan
11.87
bh
Vynil 30x30cm
0.25
kg
Lem
No.
27
SNI
KODE
A.4.4.3.63
KOEF
URAIAN PEKERJAAN
SAT.
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m'
Pemasangan Plint Kayu Klas II Ukuran 2x10 cm Tenaga
L.01
0.12
OH
Pekerja
L.02
0.12
OH
Tukang Batu
L.03
0.012
OH
Kepala Tukang
L.04
0.006
OH
Mandor Bahan
0.003
m3
Papan Kayu Klas II
0.05
kg
Paku Sekrup 5 cm
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
N PEKERJAAN PENUTUP LANTAI dan DINDING
tai Ubin PC Abu-abu Uk. 30 x 30 cm
95,297.50 26,895.00 57,000.00
14,250.00
84,000.00
10,500.00
87,000.00
1,131.00
78,000.00
1,014.00 59,739.09
11.1111111111
3,090.91
36,689.09
0.3
1,360.00
13,600.00
0.09
210,000.00
9,450.00
86,634.09 8,663.41
10%
95,297.50
tai Ubin PC Abu-abu Uk. 20 x 20 cm
tai Ubin PC Warna Uk. 30 x 30 cm
95,209.40 29,040.00 57,000.00
15,390.00
84,000.00
11,340.00
87,000.00
1,218.00
78,000.00
1,092.00 57,514.00
1,280.00
33,920.00
1,360.00
14,144.00
210,000.00
9,450.00
86,554.00 10%
8,655.40 95,209.40
124,293.50 27,885.00
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
57,000.00
14,820.00
84,000.00
10,920.00
87,000.00
1,131.00
78,000.00
1,014.00 85,109.09
4,090.91
48,559.09
1,360.00
13,600.00
9,000
13,500.00
210,000.00
9,450.00
112,994.09 11,299.41
10%
124,293.50
tai Ubin PC Warna Uk. 20 x 20 cm
120,575.40 29,040.00 57,000.00
15,390.00
84,000.00
11,340.00
87,000.00
1,218.00
78,000.00
1,092.00 80,574.00
1,600.00
42,400.00
1,360.00
14,144.00
9,000.00
14,580.00
210,000.00
9,450.00
109,614.00 10%
10,961.40 120,575.40
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
tai Ubin Granito Uk. 40 x 40 cm
347,075.30 26,895.00 57,000.00
14,250.00
84,000.00
10,500.00
87,000.00
1,131.00
78,000.00
1,014.00 288,628.00
0.4
38,333.33
254,150.00
0.16
1,360.00
13,328.00
6.25
9,000.00
11,700.00
210,000.00
9,450.00
315,523.00 31,552.30
10%
347,075.30
n Plin Pc.Abu-abu Uk. 15 x 20 cm
57,815.34 13,863.00 57,000.00
5,130.00
84,000.00
7,560.00
87,000.00
783.00
78,000.00
390.00 38,696.40
5,200.00
27,560.00
1,360.00
1,686.40
210,000.00
9,450.00
52,559.40 5,255.94
10%
57,815.34
n Plin Pc.Warna Uk. 10 x 20 cm
34,087.24 13,863.00 57,000.00
5,130.00
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
84,000.00
7,560.00
87,000.00
783.00
78,000.00
390.00 17,125.40
5,300.00
14,045.00
1,360.00
1,550.40
9,000.00
900.00
210,000.00
630.00
30,988.40 3,098.84
10%
34,087.24
189,588.74 75,075.00 57,000.00
39,900.00
84,000.00
29,400.00
87,000.00
3,045.00
78,000.00
2,730.00 97,278.40
980.00
51,940.00
1,360.00
11,138.40
9,000.00
24,750.00
210,000.00
9,450.00
172,353.40 10%
17,235.34 189,588.74
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
tai Keramik Uk. 10 x 10 cm / 5 x 20 cm
194,043.74 75,075.00 57,000.00
39,900.00
84,000.00
29,400.00
87,000.00
3,045.00
78,000.00
2,730.00 101,328.40
490.00
51,940.00
1,360.00
11,138.40
9,000.00
28,800.00
210,000.00
9,450.00
176,403.40 17,640.34
10%
194,043.74
186,045.52 75,075.00 57,000.00
39,900.00
84,000.00
29,400.00
87,000.00
3,045.00
78,000.00
2,730.00 94,057.29
5,888.89
58,888.89
1,360.00
11,138.40
210,000.00
9,450.00
9,000.00
14,580.00
169,132.29 10%
16,913.23 186,045.52
185,698.50 75,075.00
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
57,000.00
39,900.00
84,000.00
29,400.00
87,000.00
3,045.00
78,000.00
2,730.00 93,741.82
4,818.18
57,191.82
1,360.00
13,600.00
210,000.00
9,450.00
9,000.00
13,500.00
168,816.82 16,881.68
10%
185,698.50
187,537.90 75,075.00 57,000.00
39,900.00
84,000.00
29,400.00
87,000.00
3,045.00
78,000.00
2,730.00 95,414.00
2,160.00
57,240.00
1,360.00
14,144.00
9,000.00
14,580.00
210,000.00
9,450.00
170,489.00 10%
17,048.90 187,537.90
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
ntai Keramik uk.10 x 33 cm, untuk variasi / border
372,238.90 111,291.00 57,000.00
59,850.00
84,000.00
44,100.00
87,000.00
4,611.00
78,000.00
2,730.00 227,108.00
5,000.00
165,000.00
1,360.00
13,328.00
9,000.00
39,330.00
210,000.00
9,450.00
338,399.00 33,839.90
10%
372,238.90
32,470.24 13,863.00 57,000.00
5,130.00
84,000.00
7,560.00
87,000.00
783.00
78,000.00
390.00 15,655.40
2,500.00
13,250.00
1,360.00
1,550.40
210,000.00
630.00
9,000.00
225.00
29,518.40 2,951.84
10%
32,470.24
78,774.74 13,863.00 57,000.00
5,130.00
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
84,000.00
7,560.00
87,000.00
783.00
78,000.00
390.00 57,750.40
5,200.00
55,120.00
1,360.00
1,550.40
210,000.00
630.00
9,000.00
450.00
71,613.40 7,161.34
10%
78,774.74
76,442.74 13,863.00 57,000.00
5,130.00
84,000.00
7,560.00
87,000.00
783.00
78,000.00
390.00 55,630.40
5,000.00
53,000.00
1,360.00
1,550.40
210,000.00
630.00
9,000.00
450.00
69,493.40 10%
6,949.34 76,442.74
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
ntai Marmer Ukuran 1.00x1.00 cm
665,514.74 75,075.00 57,000.00
39,900.00
84,000.00
29,400.00
87,000.00
3,045.00
78,000.00
2,730.00 529,938.40
475,000.00
503,500.00
1,360.00
11,138.40
210,000.00
9,450.00
9,000.00
5,850.00
605,013.40 60,501.34
10%
665,514.74
187,771.10 26,151.00 57,000.00
9,690.00
84,000.00
14,280.00
87,000.00
1,479.00
78,000.00
702.00 144,550.00
125,000.00
131,250.00
38,000.00
13,300.00
170,701.00 17,070.10
10%
187,771.10
338,662.50 75,075.00 57,000.00
39,900.00
84,000.00
29,400.00
87,000.00
3,045.00
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
78,000.00
2,730.00 232,800.00
200,000.00
210,000.00
38,000.00
22,800.00
307,875.00 30,787.50
10%
338,662.50
212,301.29 107,250.00 57,000.00
57,000.00
84,000.00
42,000.00
87,000.00
4,350.00
78,000.00
3,900.00 85,751.17
518.29
44,573.17
82.6446280992
1,360.00
12,648.00
0.0121
9,000.00
24,750.00
0.11
210,000.00
3,780.00
193,001.17 19,300.12
10%
212,301.29
208,607.30 96,525.00 57,000.00
51,300.00
84,000.00
37,800.00
87,000.00
3,915.00
78,000.00
3,510.00
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 93,118.00 980.00
51,940.00
1,360.00
12,648.00
210,000.00
3,780.00
9,000.00
24,750.00
189,643.00 18,964.30
10%
208,607.30
200,654.30 96,525.00 57,000.00
51,300.00
84,000.00
37,800.00
87,000.00
3,915.00
78,000.00
3,510.00 85,888.00
2,000.00
52,000.00
1,360.00
12,648.00
210,000.00
3,780.00
9,000.00
17,460.00
182,413.00 18,241.30
10%
200,654.30
208,607.30 96,525.00 57,000.00
51,300.00
84,000.00
37,800.00
87,000.00
3,915.00
78,000.00
3,510.00 93,118.00
980.00
51,940.00
1,360.00
12,648.00
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
210,000.00
3,780.00
9,000.00
24,750.00
189,643.00 18,964.30
10%
208,607.30
201,754.30 96,525.00 57,000.00
51,300.00
84,000.00
37,800.00
87,000.00
3,915.00
78,000.00
3,510.00 86,888.00
2,000.00
53,000.00
1,360.00
12,648.00
210,000.00
3,780.00
9,000.00
17,460.00
183,413.00 18,341.30
10%
201,754.30
ding Marmer Ukuran 1.00x1.00 cm
738,153.36 139,425.00 57,000.00
74,100.00
84,000.00
54,600.00
87,000.00
5,655.00
78,000.00
5,070.00
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 531,623.51
475,000.00
503,500.00
35.00
105.11
1,360.00
16,918.40
210,000.00
5,250.00
9,000.00
5,850.00
671,048.51 67,104.85
10%
738,153.36
ding Batu Paros / Batu Tempel Hitam
223,195.50 75,075.00 57,000.00
39,900.00
84,000.00
29,400.00
87,000.00
3,045.00
78,000.00
2,730.00 127,830.00
95,000.00
104,500.00
1,360.00
15,980.00
210,000.00
7,350.00
202,905.00 20,290.50
10%
223,195.50
133,928.30 36,285.00 57,000.00
19,950.00
84,000.00
14,700.00
87,000.00
1,479.00
78,000.00
156.00 85,468.00
6,400.00
75,968.00
38,000.00
9,500.00
URAIAN PEKERJAAN
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
121,753.00 12,175.30
10%
133,928.30
nt Kayu Klas II Ukuran 2x10 cm
40,900.20 18,432.00 57,000.00
6,840.00
84,000.00
10,080.00
87,000.00
1,044.00
78,000.00
468.00 18,750.00
6,000,000.00
18,000.00
15,000.00
750.00
37,182.00 10%
3,718.20 40,900.20
No.
SNI
XIV
A.4.7.1
1
A.4.7.1.1
KODE
KOEF
HARGA SATUAN PEKERJAAN PENGECATAN 1
Pengikisan / pengerokan Permukaan Cat Tembok Lama
A
Tenaga
0.15
OH
Pekerja
L.04
0.0030
OH
Mandor
B
Bahan
Kg
Soda Api
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.2
1
m2 A
Tenaga
0.15
OH
Pekerja
L.04
0.0030
OH
Mandor
B
Bahan
Kg
Sabun
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.3
1
m2
10%
Pengerokan Karat Cat Lama permukaan Baja dg cara man
A
Tenaga
L.01
0.15
OH
Pekerja
L.04
0.0080
OH
Mandor
B
Bahan
Kg
Sabun
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
0.05
10%
Pencucian Bidang Permukaan Tembok yang Pernah dicat
L.01
0.05
3
m2
L.01
0.05
2
URAIAN PEKERJAAN
SAT.
10%
No.
SNI
4
A.4.7.1.4
5
KODE
KOEF
URAIAN PEKERJAAN
SAT. 1
m2
Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat das
A
Tenaga
L.01
0.070
OH
Pekerja
L.02
0.009
OH
Tukang Cat
L.03
0.006
OH
Kepala Tukang
L.04
0.003
OH
Mandor
B
Bahan
0.2000
kg
Cat Menie
0.1500
kg
Plamuur
0.1700
kg
Cat Dasar
0.2600
kg
Cat Penutup
0.0100
bh
Kuas
0.0300
kg
Pengencer
0.2000
lbr
Amplas
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.5
1
m2
10%
Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat das
A
Tenaga
L.01
0.070
OH
Pekerja
L.02
0.105
OH
Tukang Cat
L.03
0.004
OH
Kepala Tukang
L.04
0.003
OH
Mandor
No.
6
SNI
KODE
A.4.7.1.6
KOEF
B
Bahan
0.2000
kg
Cat Menie
0.1500
kg
Plamuur
0.1700
kg
Cat Dasar
0.3500
kg
Cat Penutup
0.0100
bh
Kuas
0.0300
kg
Pengencer
0.2000
lbr
Amplas
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
1
m2 A
Tenaga
0.04
OH
Pekerja
L.02
0.063
OH
Tukang Cat
L.03
0.063
OH
Kepala Tukang
L.04
0.0030
OH
Mandor
B
Bahan
Ltr
Teak Oil
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.7
1
L.01
0.04
m2
10%
Pelaburan Bidang Kayu dg Teak Oil
L.01
0.36
7
URAIAN PEKERJAAN
SAT.
Pelaburan Bidang Kayu dg Politur
A
Tenaga
OH
Pekerja
L.02
0.06
OH
Tukang Cat
L.03
0.016
OH
Kepala Tukang
L.04
0.0030
OH
Mandor
B
Bahan
0.15
Ltr
Politur
0.372
Ltr
Politur Jadi
2
Lbr
Ampelas
10%
No.
8
SNI
KODE
A.4.7.1.8
KOEF
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2 A
Tenaga
0.1
OH
Pekerja
L.04
0.006
OH
Mandor
B
Bahan
Ltr
Residu atau Ter
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.9
1
m2
10%
Pelaburan Bidang Kayu dg Cat Residu & Ter
L.01
0.35
9
URAIAN PEKERJAAN
SAT.
10%
Pelaburan Bidang Kayu dg Vernis
A
Tenaga
L.01
0.16
OH
Pekerja
L.02
0.16
OH
Tukang Cat
L.03
0.016
OH
Kepala Tukang
L.04
0.0030
OH
Mandor
B
Bahan
0.15
Ltr
Vernis
0.05
Ltr
Dempul
0.1
Lbr
Ampelas
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
10%
No.
SNI
10
A.4.7.1.10
KODE
KOEF
URAIAN PEKERJAAN
SAT. 1
m2
Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup)
11
12
A
Tenaga
L.01
0.02
OH
Pekerja
L.02
0.063
OH
Tukang Cat
L.03
0.0063
OH
Kepala Tukang
L.04
0.0030
OH
Mandor
B
Bahan
0.1
Kg
Plamir
0.1
Kg
Cat Dasar
0.26
Kg
Cat Penutup 2 kali
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.11
1
m2
Pengecatan Tembok Lama (1lap.Plamir, 2lap Cat Penutup
A
Tenaga
L.01
0.028
OH
Pekerja
L.02
0.042
OH
Tukang Cat
L.03
0.0042
OH
Kepala Tukang
L.04
0.0030
OH
Mandor
B
Bahan
0.12
Kg
Cat Dasar
0.18
Kg
Cat Penutup 2 kali
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.12
1
m2
10%
Pengecatan Tembok dengan Kalkarium
A
Tenaga
L.01
0.028
OH
Pekerja
L.02
0.042
OH
Tukang Cat
L.03
0.0042
OH
Kepala Tukang
10%
No.
SNI
KODE L.04
KOEF 0.0030
0.1
13
14
A.4.7.1.13
URAIAN PEKERJAAN
SAT.
1
OH
Mandor
B
Bahan
Kg
Kalkarium
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pelaburan Tembok dengan Kapur Sirih
A
Tenaga
L.01
0.150
OH
Pekerja
L.02
0.001
OH
Tukang Cat
L.03
0.0001
OH
Kepala Tukang
L.04
0.0025
OH
Mandor
B
Bahan
0.15
Kg
Kapur Sirih
0.1
lbr
Amplas
0.25
ikat
Alang-alang
A.4.7.1.14
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
10%
10%
Pelaburan Tembok lama dengan Kapur Sirih (pemeliharaa
A
Tenaga
L.01
0.040
OH
Pekerja
L.02
0.005
OH
Tukang Cat
L.03
0.0005
OH
Kepala Tukang
L.04
0.0025
OH
Mandor
No.
15
16
SNI
KODE
A.4.7.1.15
KOEF
URAIAN PEKERJAAN
SAT. B
Bahan
0.30
Kg
Kapur Sirih
0.2
lbr
Amplas
0.25
ikat
Alang-alang
1
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
Pemasangan Wallpaper
A
Tenaga
L.01
0.020
OH
Pekerja
L.02
0.200
OH
Tukang Cat
L.03
0.0200
OH
Kepala Tukang
L.04
0.0025
OH
Mandor
B
Bahan
1.20
lbr
Wall Paper
0.2
kg
Lem
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
A.4.7.1.16
1
m2
10%
Pengecatan Permukaan Baja dg Meni Besi
A
Tenaga
L.01
0.02
OH
Pekerja
L.02
0.2
OH
Tukang Cat
L.03
0.002
OH
Kepala Tukang
L.04
0.0025
OH
Mandor
B
Bahan
0.1
Kg
Meni Besi
0.01
Kg
Perekat / Lem
C
PERALATAN
D
Jumlah A + B + C
10%
No.
17
SNI
KODE
A.4.7.1.17
KOEF
URAIAN PEKERJAAN
SAT.
1
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
m2
10%
Pengecatan Permukaan Baja dg Meni Besi & Perancah
A
Tenaga
L.01
0.25
OH
Pekerja
L.02
0.225
OH
Tukang Cat
L.03
0.0225
OH
Kepala Tukang
L.04
0.0075
OH
Mandor
B
Bahan
0.1
Kg
Meni Besi
0.01
Kg
Perekat / Lem
0.002
m3
Perancah Kayu
C
PERALATAN
D
Jumlah A + B + C
E
Overhead & Profit (contoh 10%)
F
Harga Satuan Pekerjaan (D+E)
10%
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
engerokan Permukaan Cat Tembok Lama
10,349.90 8,784.00 57,000.00
8,550.00
78,000.00
234.00 625.00
12,500.00
625.00
9,409.00 940.90 10,349.90
dang Permukaan Tembok yang Pernah dicat
10,349.90 8,784.00 57,000.00
8,550.00
78,000.00
234.00 625.00
12,500.00
625.00
9,409.00 940.90 10,349.90
arat Cat Lama permukaan Baja dg cara manual
10,778.90 9,174.00 57,000.00
8,550.00
78,000.00
624.00 625.00
12,500.00
625.00
9,799.00 979.90 10,778.90
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
idang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penut
39,652.80 5,502.00
57,000.00
3,990.00
84,000.00
756.00
87,000.00
522.00
78,000.00
234.00
30,546.00 28,000.00
5,600.00
28,000.00
4,200.00
35,000.00
5,950.00
52,000.00
13,520.00
7,600.00
76.00
14,000.00
420.00
3,900.00
780.00
36,048.00 3,604.80 39,652.80
idang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penut
53,479.80 13,392.00
57,000.00
3,990.00
84,000.00
8,820.00
87,000.00
348.00
78,000.00
234.00
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 35,226.00
28,000.00
5,600.00
28,000.00
4,200.00
35,000.00
5,950.00
52,000.00
18,200.00
7,600.00
76.00
14,000.00
420.00
3,900.00
780.00
48,618.00 4,861.80 53,479.80
30,851.70 13,287.00 57,000.00
2,280.00
84,000.00
5,292.00
87,000.00
5,481.00
78,000.00
234.00 14,760.00
41,000.00
14,760.00
28,047.00 2,804.70 30,851.70 40,814.40 8,946.00 57,000.00
2,280.00
84,000.00
5,040.00
87,000.00
1,392.00
78,000.00
234.00 28,158.00
39,000.00
5,850.00
39,000.00
14,508.00
3,900.00
7,800.00
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
37,104.00 3,710.40 40,814.40 7,862.80 6,168.00 57,000.00
5,700.00
78,000.00
468.00 980.00
2,800.00
980.00
7,148.00 714.80 7,862.80 32,698.60 24,186.00 57,000.00
9,120.00
84,000.00
13,440.00
87,000.00
1,392.00
78,000.00
234.00 5,540.00
25,000.00
3,750.00
28,000.00
1,400.00
3,900.00
390.00 -
29,726.00 2,972.60 32,698.60
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 17,285.51
7,214.10 57,000.00
1,140.00
84,000.00
5,292.00
87,000.00
548.10
78,000.00
234.00 8,500.00
21,000.00
2,100.00
12,000.00
1,200.00
20,000.00
5,200.00
15,714.10 1,571.41 17,285.51
embok Lama (1lap.Plamir, 2lap Cat Penutup)
11,839.74 5,723.40 57,000.00
1,596.00
84,000.00
3,528.00
87,000.00
365.40
78,000.00
234.00 5,040.00
12,000.00
1,440.00
20,000.00
3,600.00
10,763.40 1,076.34 11,839.74
6,768.74 5,723.40 57,000.00
1,596.00
84,000.00
3,528.00
87,000.00
365.40
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp
78,000.00
234.00 430.00
4,300.00
430.00 -
6,153.40 615.34 6,768.74
11,855.47 8,837.70 57,000.00
8,550.00
84,000.00
84.00
87,000.00
8.70
78,000.00
195.00 1,940.00
7,500.00
1,125.00
3,900.00
390.00
1,700.00
425.00
10,777.70 1,077.77 11,855.47
mbok lama dengan Kapur Sirih (pemeliharaan)
5,976.85 2,938.50 57,000.00
2,280.00
84,000.00
420.00
87,000.00
43.50
78,000.00
195.00
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 2,495.00 4,300.00
1,290.00
3,900.00
780.00
1,700.00
425.00
5,433.50 543.35 5,976.85
76,422.50 19,875.00 57,000.00
1,140.00
84,000.00
16,800.00
87,000.00
1,740.00
78,000.00
195.00 49,600.00
35,000.00
42,000.00
38,000.00
7,600.00
69,475.00 6,947.50 76,422.50
22,867.90 18,309.00 57,000.00
1,140.00
84,000.00
16,800.00
87,000.00
174.00
78,000.00
195.00 2,480.00
21,000.00
2,100.00
38,000.00
380.00
20,789.00
HARGA BAHAN/UPAH
JUMLAH
Rp
Rp 2,078.90 22,867.90
46,389.75 35,692.50 57,000.00
14,250.00
84,000.00
18,900.00
87,000.00
1,957.50
78,000.00
585.00 6,480.00
21,000.00
2,100.00
38,000.00
380.00
2,000,000.00
4,000.00
42,172.50 4,217.25 46,389.75