DAFTAR SUMBER DATA D A E R A H

: :

SEWA

P E R A L A T AN

PASARAN BEBAS KOTA SEMARANG & SEKITAR

HARGA NO.

PERALATAN

SATUAN

MINIMUM (Rp)

1

Dump Truck 3 ton

jam

140,000

2

Dump Truck 5 ton

jam

165,000

3

Truk Bak Terbuka

Jam

110,000

4

Truk Tanki Air

Jam

110,000

5

Bulldozer

Jam

180,000

6

Motor Grader

Jam

225,000

7

Wheel Loader

Jam

200,000

8

Excavator

Jam

200,000

9

Crane 30 ton

hari

6,500,000

10

Flat Bed Truck

jam

80,000

11

Baby Roller / Pedestrian

Jam

100,000

12

P.Tire Roller 8 - 10 ton

Jam

70,000

13

Baby Roller

jam

150,000

14

Vibrator Roller self 7 ton

Jam

50,000

15

Vibrator Roller Ped 1 ton

jam

87,500

16

Water Pump 30m3/hari

Jam

30,000

17

Asphalt Sprayer

Jam

30,000

18

Pick Up

hari

250,000

19

AM P

Jam

60,000

20

Asphalt Finisher

Jam

85,000

21

Concrete Vibrator

Jam

30,000

22

Compressor

Jam

30,000

23

Concrete Mixer 0,125m3

Jam

30,000

24

Concrete Mixer 0,5m3

jam

40,000

25

Stamper

Jam

25,000

26

Genset

Jam

30,000

27

Alat Pengecat Marka

Jam

45,000

28

Mesin Las

jam

45,000

29

Stone Crusher

jam

60,000

AFTAR

SEWA

P E R A L A T AN

KOTA SEMARANG & SEKITAR HARGA MAKSIMUM (Rp)

150,000 180,000 125,000 120,000 200,000 250,000 225,000 220,000 7,000,000 100,000 120,000 100,000 175,000 60,000 90,000 35,000 40,000 300,000 70,000 90,000 40,000 40,000 40,000 50,000 30,000 30,000 55,000 55,000 70,000

KET.

DAFTAR

UPAH PEKERJA

PEKERJAAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT

Lokasi : Jalan Estetika Raya No.1 Tembalang, Semarang HARGA NO.

URAIAN PEKERJA

SATUAN

(Rp)

1 Pekerja

Hr

57,000

2 Mandor

Hr

78,000

3 Tukang listrik

Hr

84,000

4 Tukang kayu

Hr

84,000

5 Kep. tk. kayu

Hr

87,000

6 Tukang batu

Hr

84,000

7 Kep. tk. batu

Hr

87,000

8 Tukang besi

Hr

78,000

9 Kep. tk. besi

Hr

87,000

10 T u k a n g c a t

Hr

82,000

11 K e p . t k . c a t

Hr

82,000

12 T u k a n g p l i t u r

Hr

82,000

13 T u k a n g j a l a n

Hr

61,000

14 T u k a n g g a l i

Hr

64,000

15 Tukang masak aspal

Hr

57,000

16 T k . l e i d e n g

Hr

76,000

17 M a s i n i s

Hr

162,000

18 P e m b . M a s i n i s

Hr

102,000

19 P e n j a g a a p i

Hr

57,000

20 P e n j a g a m a l a m

Hr

58,000

21 Sopir

Hr

162,000

22 Pembantu Sopir

Hr

102,000

414275883.xlsx

432

KET.

daftar upah tenaga kerja

DAFTAR

HARGA

SATUAN BAHAN

BANGUNAN

PEKERJAAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT Lokasi : Jalan Estetika Raya No.1 Tembalang, Semarang

HARGA NO.

I

J E N I S

BAHAN 1 BATU KALI

2 KERIKIL

B A H A N

SAT

(Rp)

DASAR Bulat Utuh

m3

167,000

Bulat Belah

m3

177,000

Pecah

10/15

m3

198,000

Pecah

5/7

m3

215,000

Pecah

3/5

m3

235,000

Timbun

m3

122,000

Sawur / Koral

m3

235,000

Beton

0,5/1

m3

252,000

Beton

,1/2

m3

280,000

Beton

,2/3

m3

270,000

Biasa

m3

127,000

Tras Giling

m3

220,000

3 BATU BATA

ex lokal

bh

520

4 PASIR

Urug

m3

130,000

Pasang

m3

210,000

Beton

m3

280,000

Padas

m3

105,000

Liat

m3

112,000

Pasang

m3

270,000

Semen Merah

m3

177,000

Holcim 40 kg

zak

53,000

Holcim 50 kg

zak

68,000

Cibinong 40 kg

zak

55,000

Cibinong 50 kg

zak

69,000

Semen Putih 40 kg

zak

67,000

5 TANAH

6 KAPUR

7 PORTLAND CEMENT

HARGA NO.

II

J E N I S

B A H A N

SAT

(Rp)

Semen Putih 50 kg

zak

92,000

Semen warna

kg

9,000

(100 lbr)

pak

187,000

2 GENTENG BETON Genteng Beton Warna standard

bh

6,000

Genteng Beton Warna Special

bh

9,500

Genteng Beton Warna Khusus

bh

14,500

Kerpus Beton Warna Standard

bh

9,000

Kerpus Beton Warna Special

bh

11,500

Kerpus Beton Warna Khusus

bh

13,000

BAHAN

1 SIRAP

PENUTUP ATAP

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

3 GENTENG TANAH LIAT Vlaam

bh

1,700

Kodok

bh

1,800

Kodok Glasur

bh

4,100

Nok kerpus Kodok

bh

6,600

Nok kerpus Kodok Glasur

bh

8,200

Plentong super besar 18 bh/m2

bh

5,200

Nok kerpus plentong super

bh

9,000

Vlaam tebal 2 mm

bh

11,000

Vlaam tebal 3 mm

bh

13,000

Kodok tebal 2 mm

bh

11,000

Kodok tebal 3 mm

bh

14,000

. 200 cm X 102 cm X 5 mm

bh

82,000

. 225 cm X 102 cm X 5 mm

bh

95,000

. 250 cm X 102 cm X 5 mm

bh

97,000

. 200 cm X 102 cm X 6 mm

bh

85,000

. 225 cm X 102 cm X 6 mm

bh

92,000

. 250 cm X 102 cm X 6 mm

bh

106,000

. 150 cm X 105 cm X 4 mm

bh

43,000

. 180 cm X 105 cm X 4 mm

bh

52,000

. 210 cm X 105 cm X 4 mm

bh

62,000

. 240 cm X 105 cm X 4 mm

bh

69,000

. 270 cm X 105 cm X 4 mm

bh

80,000

. 300 cm X 105 cm X 4 mm

bh

87,000

ONDULINE : 95 cm x 200cm x 0.3mm

lbr

140,000

ONDUVILLA : 40cm x 106 cm x 0,3mm

lbr

75,000

bh

30,000

4 GENTENG KACA

5 ASBES GELOMBANG BESAR

Asbes Gelombang Kecil

NOK

Jabes nok . Kerpus Genteng

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

. Stel Besar

bh

47,000

. Paten Besar

bh

44,000

. Stel Besar

bh

45,000

. Patent Besar

bh

28,000

. Plat besar

bh

52,000

lbr

100,000

. 100cm X 100 cm X 3 mm

bh

16,000

. 100cm X 100 cm X 4 mm

bh

18,000

. 50 cm X 200 cm X 3 mm

bh

14,000

. 40 cm X 200 cm X 3 mm

bh

13,000

Nokstel gelombang harflex

NOK UNT ONDULINE & ONDUVILLA Ukuran 50cm x 50 cm x 0,3mm 6 ASBES PLAT

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

FIBER PLAT

uk. 100cm x 100cm x 4mm

lbr

25,000

unt Plafond

uk. 120cm x 240cm x 4mm

lbr

66,000

uk. 122cm x 244cm x 4mm

lbr

68,000

uk.122cm x 244cm x 5mm

lbr

100,000

uk.122cm x 244cm x 6mm

lbr

125,000

uk.122cm x 244cm x 8mm

lbr

185,000

uk.122cm x 244cm x 10mm

lbr

245,000

180 X 92 cm

bh

50,000

200 X 92 cm

bh

60,000

250 X 92 cm

bh

65,000

180 X 105 cm

bh

75,000

210 X 105 cm

bh

75,000

250 X 105 cm

bh

100,000

BJLS 0,18 lebar 55 cm

m'

15,000

BJLS 0,20 lebar 55 cm

m'

26,000

BJLS 0,28 lebar 55 cm

m'

26,000

BJLS 0,30 lebar 55 cm

m'

28,000

BJLS 0,18 panjang 180 cm

lbr

47,000

BJLS 0,20 panjang 180 cm

lbr

50,000

BJLS 0,30 panjang 180 cm

lbr

55,000

BJLS 0,40 panjang 180 cm

lbr

73,000

Papan

m3

22,000,000

Balok/pesagen

m3

20,000,000

Papan

m3

7,600,000

Balok/pesagen

m3

7,000,000

Papan

m3

6,000,000

Balok/pesagen

m3

5,500,000

Papan

m3

4,900,000

GRC BOARD

7 FIBRE GLASS (JABES)

8 SENG PLAT

9 SENG GELOMBANG

III . B A H A N K A Y U 1 JATI

2 KAMPER

3 KRUING

4 MERANTI

HARGA NO.

J E N I S

5 LANAN

6 BENGKIRAI

7 DOLKEN

B A H A N

SAT

(Rp)

Balok/pesagen

m3

4,500,000

Papan

m3

2,100,000

Balok/pesagen

m3

2,000,000

Papan

m3

9,800,000

Balok/pesagen

m3

9,500,000

Sedang 8 x 10 x 400 cm

bt

18,000

Kecil 6 x 7 x 400 cm

bt

16,000

Besar 10 x 12 x 400 cm

bt

29,000

Kayu cetakan

m3

1,900,000

Kayu bakar

m3

155,000

Bambu

bt

10,000

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

IV . BAHAN PENUTUP DINDING / LANTAI 1 UBIN (TEGEL BIASA) PC polos

30 X 30 cm

m2

34,000

20 X 20 cm

m2

32,000

30 X 30 cm

m2

45,000

20 X 20 cm

m2

40,000

30 X 30 cm

m2

53,000

PC warna

10 X 20 cm

bh

5,300

PC abu-abu

15 x 20

bh

5,200

Lantai/badan

m'

Plint

m'

Trap

m'

11 X 11 putih

dos

42,500

11 X 11 warna

dos

46,000

15 X 15 putih

dos

47,000

15 X 15 warna

dos

49,000

10 X 20 cm

m2

49,000

15 X 15 cm

m2

50,000

20 X 20 cm

m2

50,000

20 X 25 cm

m2

53,000

30 X 30 cm

m2

53,000

20 X 20 cm

m2

54,000

33 x 33 cm

m2

53,000

25 x 25 cm

m2

52,000

15 x 20 cm

m2

53,000

PC warna

Teraso 2 TEGEL PLINT

3 POLIS UBIN

4 UBIN PORSELIN Lokal

Lokal

5 MOZAIK PORSELIN

6 Keramik

2,250

HARGA NO.

J E N I S

SAT

(Rp)

7 Parquet Jati

m2

200,000

8 Batu Paros

m2

95,000

9 Batu Tempel Hitam

m2

98,000

40 x 40 cm

m2

230,000

30 x 30 cm

m2

270,000

m2

475,000

10 cm - 100 cm

bh

30,000

Ø 20 cm - 100 cm

bh

35,000

Ø 30 cm - 100 cm

bh

42,500

Ø 50 cm - 100 cm

bh

80,000

Ø 60 cm - 100 cm

bh

105,000

Ø 70 cm - 100 cm

bh

130,000

10 GRANITO

11

B A H A N

Marmer

V.BAHAN CETAK 1 BUIS BETON

Ø

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

U 10 cm - 100 cm

bh

21,000

U 15 cm - 100 cm

bh

27,000

U 20 cm - 100 cm

bh

35,000

U 30 cm - 100 cm

bh

40,000

U 50 cm - 100 cm

bh

2 LUBANG ANGIN (ROSTER) PC + PASIR 10 X 20 cm

bh

5,700

20 X 20 cm

bh

6,500

25 X 25 cm

bh

7,000

30 X 30 cm

bh

7,500

15 X 25 cm

bh

7,500

15 X 30 cm

bh

7,700

besi beton polos

kg

10,000

besi beton prestress

kg

16,500

besi beton ulir

kg

12,500

2 BESI PLAT

Besi Strip

kg

12,500

3 BESI PROFIL

Besi Profil

kg

13,000

VI . B A H A N B E S I 1 BESI BETON

a

b

c

BAJA RINGAN GALVALUME

lebar : 7,5cm tebal : 1mm

btg

125,000

type CT 75

lebar : 7,5cm tebal : 0.75mm

btg

85,000

lebar : 7,5cm tebal : 0,65mm

btg

80,000

type RT 12

tinggi : 3,5 cm, tebal : 0,45mm

btg

45,000

type RT 10

tinggi : 3,0 cm, tebal : 0,45mm

btg

40,000

tinggi 2 cm; tebal : 0,4mm

btg

25,000

tinggi 4 cm; tebal : 0,4 mm

btg

30,000

HOLLOW GALVANIS LIPAT

4 JARING - JARING BAJA Diameter

4 - 15

kg

15,000

Diameter

6 - 15

kg

15,000

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

Kawat Bronjong

kg

9,500

40 X 40 X 4

btg

135,000

L 50 X 50 X 5

btg

210,000

L 60 X 60 X 6

btg

300,000

6 KAWAT - Ikat beton/bendrat

kg

15,000

- Harmonika 12 X 45 mm

m2

22,000

- Harmonika 12 X 24 mm

m2

22,000

- Harmonika 14 X 30 mm

m2

23,000

- Harmonika 14 X 35 mm

m2

20,000

- Kawat Nyamuk Nylon

m2

9,000

- Kawat Kasa

m2

14,000

- Saringan pasir

m2

14,000

- Kawat loket

m2

15,000

- Kawat duri

rol

115,000

- Kawat bronjong

kg

20,000

5 BESI SIKU

L

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

VII . B A H A N P I P A 1 Pipa PVC SII SCJ , S - 12,5 (10 bar) Pipa PVC DN 20 ( ½" ) AW JIS

btg

27,000

Pipa PVC DN 25 ( ¾" ) AW JIS

btg

33,000

Pipa PVC DN 32 ( 1" ) AW JIS

btg

45,000

Pipa PVC DN 40 ( 1½" )

btg

65,000

Pipa PVC DN 63 ( 2" )

btg

110,000

Pipa PVC DN 90 ( 3" )

btg

200,000

Pipa PVC DN 110 ( 4" )

btg

300,000

Pipa PVC DN 160 ( 6" )

btg

625,000

Pipa PVC DN 200 ( 8" )

btg

1,000,000

Pipa PVC DN 250 ( 10" )

btg

1,400,000

Pipa PVC DN 315 ( 12" )

btg

2,050,000

Pipa Medium B Galvanis DN ½"

btg

67,000

Pipa Medium B Galvanis DN 25 ( ¾" )

btg

80,000

Pipa Medium B Galvanis DN 32 ( 1" )

btg

97,000

Pipa Medium B Galvanis DN 50 ( 1½" )

btg

140,000

Pipa Medium B Galvanis DN 63 ( 2" )

btg

170,000

Pipa Medium B Galvanis DN 2½"

btg

250,000

Pipa Medium B Galvanis DN 90 ( 3" )

btg

470,000

Pipa Medium B Galvanis DN 110 ( 4" )

btg

560,000

Pipa Medium B Galvanis DN 160 ( 6" )

btg

-

Pipa Medium B Galvanis DN 200 ( 8" )

btg

-

Pipa Medium B Galvanis DN 250 ( 10")

btg

-

30 X 30

lbr

5,600

30 X 60

lbr

13,500

60 X 120

lbr

41,000

3 Pipa Medium B Galvanis - SII

VIII . B A H A N L A N G I T - L A N G I T 1 AKUSTIK-uk :

HARGA NO.

J E N I S

B A H A N

List Kayu Profil

SAT

(Rp)

m'

4,800

lbr

65,500

lbr

69,000

uk.120cmx240cmx9mm

lbr

57,500

90 X 210

X 3 mm

lbr

52,000

. 120 X 240

X 3 mm

lbr

87,000

. 90 X 210

X 4 mm

lbr

66,000

. 90 X 210

X 9 mm

lbr

117,000

. 90 X 210

X 12 mm

lbr

165,000

. 90 X 210

X 15 mm

lbr

230,000

. 90 X 210

X 18 mm

lbr

300,000

2 SOFT BOARD-uk:

4'X 8'

Gypsum tebal 9 mm 3 HARD BOARD-uk: 4'X 8' GYPROC 4 PLY WOOD Teak wood

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

Tripleks . 120 X 240

X 3 mm

lbr

53,000

. 120 X 240

X 4 mm

lbr

63,000

. 120 X 240

X 6 mm

lbr

76,000

. 120 X 240

X 9 mm

lbr

115,000

. 120 X 240

X 12 mm

lbr

147,000

. 120 X 240

X 15 mm

lbr

192,000

. 120 X 240

X 18 mm

lbr

215,000

lbr

70,000

Menie

kg

28,000

Dempul plamur

kg

28,000

Ambril/amplas

lbr

3,900

Batu Apung

kg

29,000

Cat dasar

kg

35,000

. Emco

kg

52,000

. Yunior 66 (nippon paint)

kg

52,000

- Koas

bh

7,600

. Deculux

kg

56,000

. Siralax

ons

16,000

. Spiritus

ltr

12,000

. Plitur jadi

ltr

39,000

Kalkarium

kg

4,300

Kapur sirih

kg

4,300

Plamur

kg

21,000

Cat Tembok

kg

20,000

Sintex

5 kg

100,000

Danabride

5 kg

102,000

Multipleks

Formika ukuran pintu IX . B A H A N F I N I S H I N G 1 KAYU

2 TEMBOK

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

Catylac

5 kg

110,000

Mowilex

5 kg

280,000

3 BESI

-

Menie

kg

21,000

Cat mengkilat

kg

56,000

Cat

kg

37,000

Thinner A

ltr

15,000

Minyak cat

ltr

14,000

Thinner Super

ltr

19,000

drum

56,000

kapasitas 550 liter.

bh

880,000

kapasitas 1100 liter.

bh

1,655,000

Lem Aica Aibon

kg

38,000

Residu (teer/aspal) Fibre glass (tanki air)

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

X.BAHAN KACA 1 POLOS

2 ES KABUR

3 RAY BAND

3 mm

m2

61,000

5 mm

m2

72,000

3 mm

m2

72,000

5 mm

m2

81,000

3 mm

m2

71,000

5 mm

m2

82,000

XI . BAHAN INSTALASI LISTRIK

1 KABEL LISTRIK N YA : .

1 X 1 1/2

mm2

m'

3,100

SPLN LMK

1 X 2 1/2

mm2

m'

3,700

1X4

mm2

m'

5,800

1X6

mm2

m'

8,600

NYY :.

2 X 1 1/2

mm2

m'

9,250

PRIMA

2 X 2 1/2

mm2

m'

15,000

2X4

mm2

m'

27,000

2X6

mm2

m'

35,500

3 X 1 1/2

mm2

m'

13,200

3 X 2 1/2

mm2

m'

20,000

3X4

mm2

m'

34,500

3X6

mm2

m'

51,000

NYM :.

2 X 1 1/2

mm2

m'

7,000

PRIMA

2 X 2 1/2

mm2

m'

11,000

2X4

mm2

m'

21,500

3 X 1 1/2

mm2

m'

12,700

3 X 2 1/2

mm2

m'

19,500

3X4

mm2

m'

31,000

3X6

mm2

m'

44,000

.

.

.

2 SKAKELAR

HARGA NO.

J E N I S

Out bauw .

B A H A N

SAT

(Rp)

Seri

bh

16,000

Engkel

bh

10,000

Seri

bh

14,000

Engkel

bh

11,000

1 group

bh

120,000

2 group

bh

225,000

3 group

bh

340,000

. In bauw . .

3 FUSE BOX (SEKERING KASA)

4 STEKER -

Biasa

bh

11,000

Arde

bh

15,500

T Biasa

bh

12,500

T dengan Arde

bh

17,000

HARGA NO.

J E N I S

5 FITING

B A H A N

SAT

(Rp)

Flaon

bh

9,000

Gantung

bh

17,000

Kap

bh

12,000

Kombinasi

bh

315,000

bh

13,500

Arde Outbow hitam

bh

5,500

Arde IB

bh

13,000

Arde Putar

bh

37,500

1 X slag

bh

58,000

2 X slag

bh

67,500

1 X slag

bh

88,000

2 X slag

bh

150,000

1 X slag

bh

58,000

2 X slag

bh

73,000

Engsel Angin

bh

15,500

Kupu-kupu biasa

bh

4,500

Nylon kupu-kupu

bh

8,000

bh

42,500

Grendel Tanam luar negeri

bh

9,000

Grendel biasa

bh

16,000

Kait Angin

bh

12,500

Door Stop

bh

300,000

1 KLOSET DUDUK

bh

1,250,000

2 KLOSET JONGKOK

bh

135,000

3 WASTAFEL PEDESTAL

bh

1,100,000

6 STOP KONTAK - Arde Outbow putih

XII . ALAT - ALAT PENGUNCI & PENGGANTUNG 1 KUNCI TANAM

Union :

Yale :

Kuda :

2 ENGSEL DAN GERENDEL

Espagnoled -

dalam negeri

XIII . BAHAN SANITAIR

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

4 WASTAFEL MEJA OVAL

bh

870,000

5 WASTAFEL GANTUNG BULAT

bh

380,000

6 WASTAFEL GANTUNG SUDUT

bh

260,000

7 WASTAFEL GANTUNG SUDUT KECIL

bh

285,000

8 WASTAFEL BAK CUCI

bh

165,000

9 TEMPAT SABUN GANTUNG

bh

34,000

bh

23,000

10 TEMPAT SABUN TANAM

11 SEPTIC TANK (ETERNIT GRESIK) 5 Pemakai 500 liter

unit

10 Pemakai 1.000 liter

unit

-

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

12 LAIN - LAIN Kran Air

bh

28,000

Seal tape

bh

4,000

Floor drain

bh

18,000

1 PAKU - ukuran 1" s/d 4"

kg

14,000

2 PAKU - payung

kg

26,000

3 PAKU - sekrup

kg

7,500

4 PAKU - beton

kg

28,000

5 MUR BAUT (kuda-kuda)

kg

13,500

6 ANGKUR BAUT

bh

13,500

7 LEM KAYU

bh

19,500

8 Tali Ijuk

kg

8,000

bh

295,000

XIV . ALAT PENGIKAT KAYU

XV . POMPA AIR. 1 POMPA AIR TANGAN Dragon buatan Indonesia 2 POMPA AIR LISTRIK Sanyo

100 watt

bh

995,000

Fuji

250 watt

bh

1,455,000

. 100 watt

bh

490,000

. 90 watt

bh

375,000

. 125 watt

bh

390,000

. 175 watt

bh

430,000

Abu-abu

m2

55,000

Merah/hitam

m2

63,000

Abu-abu

m2

58,000

Merah/hitam

m2

65,000

Abu-abu

m2

50,000

Shimizu

Dab

X VI . PAVING BLOCK 1 SQUARE

2 HOLLAND

3 UNIDECOR

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

Merah/hitam

m2

63,000

Abu-abu

m2

63,000

Merah/hitam

m2

67,000

Abu-abu

m2

63,500

Merah/hitam

m2

66,000

6 OLYMPIA HEXA

Abu-abu

m2

58,500

7 HEXAGONAL

Abu-abu

m2

65,000

Merah/hitam

m2

57,500

8 CASTLE

Abu-abu

m2

64,000

9 TRAPEZ

Abu-abu

m2

58,000

m2

62,000

11 STANDARD GRASS BLOCK ABU-ABU

BH

8,000

12 BATACO

BH

4,000

13 KANSTEEN

m'

24,000

4 UNI

5 TRIHEX

10 TRAPEZ GRASS BLOCK Abu-abu

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

XVII. L A I N - L A I N 1 KREI 25 MM

m2

48,000

2 Sliding Pintu J4

bh

210,000

3 Naco per Daun

bh

12,500

4 Rolling door Besi

m2

320,000

m2

260,000

5 Awning Almunium

m2

217,000

6 Kusen Almunium 4" Putih

m'

83,000

btg

1,548,000

drum

1,690,000

Rolling door Almunium

7 WIDE FLANGE BEAM 150 X 75 X 5 X 7 X 12

8 ASPAL. Aspal Ex Pertamina isi Net 160 kg

Hotmix Tebal = 4 Cm

m2

68,000

Hotmix Tebal = 5 Cm

m2

83,000

Hotmix Tebal = 6 Cm

m2

98,000

Hotmix Tebal = 7 Cm

m2

115,000

Binder Course

ton

1,325,000

Wearing Course

ton

1,425,000

Hot Roller Sheet

ton

1,200,000

Sand Sheet

ton

1,550,000

Sand Sheet Emulsi

ton

1,800,000

Cold Mix

ton

1,820,000

Prime / Tack Coard RC

liter

8,600

Prime Coat MC

liter

8,500

Prime / Tack Coat Emulsi

liter

8,600

m2

265,000

Pagar BRC 90 A2

/lb

185,000

Pagar BRC 120 A2

/lb

240,000

10 K A C A Cermin tebal 5 mm

11 PAGAR BRC.

HARGA NO.

J E N I S

B A H A N

SAT

(Rp)

12 LAIN-LAIN Minyak Beton & bekisting

ltr

9,700

Pintu Lipat Besi

m2

410,000

Sunscreen Allumunim

m2

335,000

Allumunium Foil

m2

7,700

Soda api

kg

12,500

Sabun

kg

12,500

Air

m3

18,000

Koas Alang-alang

ikat

1,700

Solar (Industri)

ltr

11,300

Premium (Industri)

ltr

10,700

Pelumas

ltr

42,500

Vynil 30x30 cm

bh

6,400

UNAN

NGKAT

KET

KET

KET

KET

KET

KET

KET

KET

KET

panj : 6 m panj : 6 m panj : 6 m panj : 6 m panj : 6 m

panj : 4 m panj : 4 m

KET

KET

panjang 4 m panjang 4 m panjang 4 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m

panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m panjang 6 m

KET

KET

KET

KET

KET

KET

KET

KET

KET

KET

KET

Perhitungan Human Resources Mengambil Minggu ke 11 yang memiliki volume pekerjaan terbanyak dalam pelaksanaan proyek No.

Jenis Pekerjaan

1 Air kerja dan listrik 2 Administrasi dan Dokumentasi 3 Pemasangan Dinding Bata Merah Uk (5x11x22)cm T 1/2 Bata Camp. 1pc : 6pp 4 Pemasangan Plesteran 1Pc : 3pp t=15 mm 5 Pemasangan Plesteran 1Pc : 6pp t=15mm 6 Pembuatan dan Pemasangan Kusen Pintu dan Jendela kelas I 7 Pelaburan Bidang Kayu dg Politur 8 Pemasangan Dinding Bata Merah Uk (5x11x22)cm T 1/2 Bata Camp. 1pc : 6pp 9 Pemasangan Plesteran 1Pc : 6pp t=15mm 10 Pembuatan dan Pemasangan Kusen Pintu dan Jendela kelas I 11 Membuat Kolom Beton Bertulang 12 Pemasangan Pipa PVC tipe AW Ø ½"

ls ls

Volume Total 1.00 1.00

Volume/ Minggu 0.050 0.050

Bobot Total 0.124 20.000

Bobot/ Minggu 0.006 1.000

2

m2

280.00

140.000

1.675

0.838

1 2

m2 m2

27.00 344.00

27.000 172.000

0.175 2.058

0.175 1.029

2

m3

0.29

0.146

0.969

0.485

2

m2

16.65

8.326

0.084

0.042

2

m2

260.00

130.000

1.556

0.778

2

m2

290.25

145.125

1.273

0.636

3

m3

0.82

0.274

2.734

0.911

2 1

m3 m1

4.88 50

2.440 50

4.868 0.273

2.434 0.273396

Durasi

Satuan

20 20

RENCANA ANGGARAN BIAYA (RAB) KEGIATAN : PEMBANGUNAN BANGUNAN RUMAH TINGGAL PEKERJAAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT Lokasi : Jalan Estetika Raya No.1 Tembalang, Semarang JENIS PEKERJAAN

VOL.

SAT. HARGA SAT.PEK

JUMLAH

2 3 4 5 6 7 8

A. LANTAI 1 PEKERJAAN PERSIAPAN Pagar Sementara dari Seng Gelombang Tinggi 2,00 m Pengukuran dan Pemasangan Bouwplank Pembuatan Kantor Sementara dg Lantai Plesteran Pembuatan Gudang Semen dan Alat-alat Membersihkan Lapangan dan Perataan Air kerja dan listrik Papan Nama Proyek Administrasi dan Dokumentasi

1.000 ls 70.000 m' 9.000 m2 1.000 ls 200.000 m2 1.000 ls 1.000 ls 1.000 ls

II 1 2 3 4 5 6

PEKERJAAN TANAH Menggali Tanah Biasa Sedalam 1 m Pengurugan Kembali Menggali Tanah Biasa Sedalam 2 m Pengurugan Kembali Urugan Pasir Bawah Pondasi Urugan Pasir Bawah Lantai lt 1

122.097 40.699 44.064 14.688 6.750 11.355

III 1 2

PEKERJAAN PONDASI Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP Pemasang Batu Kosong/Anstamping

IV 1

PEKERJAAN DINDING Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP

20.250

m2

Rp

52,338 Rp

1,059,853

2

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP

280.000 m2

Rp

48,236 Rp

13,506,034

jumlah

Rp

14,565,887

V 1 2 3

PEKERJAAN PLESTERAN Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm Pemasangan Acian

Rp Rp Rp jumlah

52,338 Rp 48,236 Rp 28,457 Rp Rp

1,413,137 16,593,128 10,557,547 28,563,811

VI 1 2

PEKERJAAN KUSEN KAYU Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II

0.291 m3 Rp 26,851,000 Rp 708,373 Rp 16.360 m3 Rp jumlah Rp

7,814,285 11,588,974 19,403,260

VII 1 2 3 4 5 6 7

PEKERJAAN BETON Membuat Lantai Kerja Beton Mutu K(100) Membuat Beton Mutu K(250) Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting) Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) Membuat Balok Beton Bertulang (200 kg Besi + Bekisting) Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)

I

Rp 10,000,000 Rp 136,004 Rp 1,810,859 Rp 1,702,008 Rp 10,560 Rp 1,000,000 Rp 300,000 Rp 1,500,000 jumlah

Rp Rp Rp Rp Rp Rp Rp Rp Rp

10,000,000 9,520,280 16,297,727 1,702,008 2,112,000 1,000,000 300,000 1,500,000 42,432,015

m3 m3 m3 m3 m3 m3

Rp 49,170 Rp Rp 49,170 Rp Rp 60,291 Rp Rp 60,291 Rp Rp 191,268 Rp Rp 191,268 Rp jumlah Rp

6,003,509 2,001,170 2,656,663 885,554 1,291,059 2,171,848 15,009,803

42.590 m3 18.360 m3

Rp 686,890 Rp Rp 415,157 Rp jumlah Rp

29,254,624 7,622,273 36,876,897

27.000 m2 344.000 m2 371.000 m2

0.450 13.060 8.127 4.725 9.805 3.695 1.643

m3 m3 m3 m3 m3 m3 m3

Rp 866,589 Rp 4,659,540 Rp 3,769,209 Rp 4,608,610 Rp 8,040,786 Rp 6,321,926 Rp 5,815,112 jumlah

Rp Rp Rp Rp Rp Rp Rp Rp

389,965 60,851,722 30,632,836 21,775,680 78,839,902 23,359,515 9,551,321 225,400,940

VIII 1 2

PEKERJAAN LANGIT-LANGIT Langit-langit Gypsum Board & Rangka Allumunium (Concealed) List Gypsum

IX 1 2 3 4 5 6 7 8

PEKERJAAN SANITASI Memasang Closet Duduk / Mono Blok Memasang Wastafel + Kran Pemasangan Floor Drain Memasang Soap Holder Memasang Paper Holder Memasang Shower dan Kran Memasang Kran Air Memasang Pompa Air (Sanyo)

X 1 2 3

PEKERJAAN PLUMBING Pemasangan Pipa PVC tipe AW Ø ½" Pemasangan Pipa PVC tipe AW Ø 4" Septictank + peresapan

XI 1

PEKERJAAN BESI DAN ALUMUNIUM Memasang Railling Tangga

XII 1 2 3 4 5 6 7

PEKERJAAN KUNCI DAN KACA Memasang Kunci Tanam Memasang Engsel Pintu dan Jendela Pasang Kait Angin lt1 Pasang Grendel Pasang Pull Handle Pasang Handle Biasa Pasang Kaca tebal 5 mm lt1

XIII 1 2 3 4

PEKERJAAN PENUTUP LANTAI DAN DINDING Pemasangan lantai Ubin Granito Uk. 40 x 40 cm Pemasangan Lantai Keramik 20 x 20 cm Pemasangan Dinding Keramik 20 x 25cm Pemasangan dinding marmer 20x40

XIV 1 2 3

PEKERJAAN PENGECATAN Pelaburan Bidang Kayu dg Politur Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar Pengecatan Plafond

XV 1 2 3 4 5 6 7

PEKERJAAN INSTALASI LISTRIK Lampu Spiral Kuning ( Teras ) Lampu LED ( Dipasang Dalam Plafond ) Saklar Tunggal Saklar Ganda Stop Kontak Instalasi Titik Lampu Kabel NYA

51.100 m2 Rp 113.000 m' Rp jumlah

4,905,307 2,314,805 7,220,112

Rp 1,779,874 Rp 666,259 Rp 31,053 Rp 75,000 Rp 80,000 Rp 200,000 Rp 72,655 Rp 995,000 jumlah

Rp Rp Rp Rp Rp Rp Rp Rp Rp

3,559,747 666,259 62,106 150,000 80,000 200,000 145,310 995,000 5,858,422

44,079 50.000 m' Rp m' Rp 44,079 50.000 1,200,000 1.000 Unit Rp jumlah

Rp Rp Rp Rp

2,203,942 2,203,942 1,200,000 5,607,883

29,758 Rp Rp

6,695,494 6,695,494

2.000 1.000 2.000 2.000 1.000 1.000 2.000 1.000

Unit Unit bh bh bh bh bh Unit

95,994 Rp 20,485 Rp Rp

225.000 m'

Rp jumlah

4.000 44.000 1.000 27.000 6.000 2.000 32.021

bh bh bh bh bh bh m2

Rp 176,152 Rp Rp 9,000 Rp Rp 30,672 Rp Rp 3,000 Rp Rp 87,000 Rp Rp 90,000 Rp Rp 90,110 Rp jumlah Rp

704,606 396,000 30,672 81,000 522,000 180,000 2,885,424 4,799,702

100.500 7.500 24.000 15.050

m2 m2 m2 m2

Rp 347,075 Rp Rp 57,815 Rp Rp 200,654 Rp Rp 350,000 Rp jumlah Rp

34,881,068 433,615 4,815,703 5,267,500 45,397,886

16.651 m2 Rp 371.000 m2 Rp 51.100 m2 Rp jumlah 3.000 15.000 1.000 7.000 4.000 12.000 50.000

bh bh bh bh bh bh m1

Rp Rp Rp Rp Rp Rp Rp jumlah

40,814 Rp 17,286 Rp 17,286 Rp Rp

679,602 6,412,924 883,290 7,975,815

34,000 98,000 10,000 16,000 13,500 13,500 3,700

102,000 1,470,000 10,000 112,000 54,000 162,000 185,000 2,095,000

Rp Rp Rp Rp Rp Rp Rp Rp

XVI 1

B. LANTAI 2 PEKERJAAN TANAH Urugan pasir bawah lantai 2

XVII

PEKERJAAN DINDING

10.883 m3

Rp 191,268 Rp jumlah Rp

2,081,570 2,081,570

1

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP

20.250

m2

Rp

52,338 Rp

1,059,853

2

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP

260.000 m2

Rp

48,236 Rp

12,541,317

jumlah

Rp

13,601,170

27.000 m2 Rp 196.000 m2 Rp 409.000 m2 Rp jumlah

48,236 Rp 52,338 Rp 28,457 Rp Rp

1,302,368 10,258,326 11,638,913 23,199,606

XVIII 1 2 3

PEKERJAAN PLESTERAN Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm Pemasangan Acian

XIX 1 2 3 4 5 6

PEKERJAAN KAYU Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I

XX 1 2

PEKERJAAN BETON Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) Membuat Ring Balok Beton Bertulang

XXI 1 2 3 4

PEKERJAAN PENUTUP ATAP Pemasangan Bubugan Genteng Beton Pemasangan Atap Genteng Beton Pemasangan Nok Genteng Beton Pasang Allumunium Foil / Sisalation

34.400 169.000 3.500 83.070

XXII 1 4

PEKERJAAN LANGIT-LANGIT Langit-langit Gypsum Board & Rangka Allumunium (Concealed) List Gypsum

51.350 m2 122.800 m1

XXIII 1 2 3 5

PEKERJAAN SANITASI Memasang Closet Duduk / Mono Blok Pemasangan Floor Drain Memasang Soap Holder Memasang Shower dan Kran

XXIV 1 2 3

PEKERJAAN PLUMBING Pemasangan Pipa PVC tipe AW Ø ½" Pemasangan Pipa PVC tipe AW Ø 4" Memasang rRoof Tank 1000 L

XXV 4 6

PEKERJAAN BESI DAN ALUMUNIUM Pemasangan Ralling Balkon 5 x 5 Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm

m3 m2 m1 m2 Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Klas I 0.87744 m3 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II 36.900 m1 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II Pemasangan konstruksi Gording, Kayu Klas II Pemasangan Rangka Atap Genteng Beton, Kayu Klas II

0.821 18.080 2.880 169.000

Rp Rp Rp Rp Rp Rp Rp

22,041,234 12,807,375 199,427 31,093,634 25,613,281 4,421,469 96,176,419

4.880 m3 2.160 m3

Rp 8,040,786 Rp Rp 6,321,926 Rp jumlah Rp

39,239,033 13,655,359 52,894,392

m1 m2 m1 m2

Rp 93,291 Rp Rp 104,606 Rp Rp 106,159 Rp Rp 24,083 Rp jumlah Rp

3,209,210 17,678,346 371,556 2,000,608 23,259,721

Rp Rp jumlah

95,994 Rp 20,485 Rp Rp

4,929,306 2,515,558 7,444,864

Rp 1,779,874 Rp 31,053 Rp 80,000 Rp 200,000 jumlah

Rp Rp Rp Rp Rp

3,559,747 62,106 160,000 400,000 4,181,853

50.000 m' Rp 44,079 60.000 m' Rp 44,079 Unit 1.000 Rp 1,600,000 jumlah

Rp Rp Rp Rp

2,203,942 2,644,730 1,600,000 6,448,672

Rp 112,641 Rp Rp 172,717 Rp jumlah Rp

1,126,410 4,697,889 5,824,299

2.000 2.000 2.000 2.000

Unit bh bh bh

Rp 26,851,000 Rp 708,373 Rp 69,245 Rp 183,986 Rp 29,190,920 Rp 119,823 jumlah

10.000 m' 27.200 m'

XXVI 1 2 3 4 5 6

PEKERJAAN KUNCI DAN KACA Memasang Kunci Tanam Memasang Engsel Pintu dan Jendela Pasang Grendel Pasang Pull Handle Pasang Handle Biasa Kaca tebal 3 mm

XXVII PEKERJAAN PENUTUP LANTAI DAN DINDING LT2 Pemasangan lantai Ubin Granito Uk. 40 x 40 cm 1 Pemasangan Lantai Keramik 20 x 20 cm 3 Pemasangan Dinding Keramik 20 x 25cm 4 Pemasangan dinding marmer 20x40 5 XXVIII PEKERJAAN PENGECATAN LT2 Pelaburan Bidang Kayu dg Politur 1 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Pengecatan Plafond 3 XXIX 1 2 3 4 5 6 7

PEKERJAAN INSTALASI LISTRIK LT2 Lampu LED ( Dipasang Dalam Plafond ) Lampu spiral kuning ( teras ) Saklar Tunggal Saklar Ganda Stop Kontak Instalasi Titik Lampu Kabel NYA

XXX 1 2 3

PEKERJAAN LAIN-LAIN Penangkal Petir Penyambungan daya ke PLN 2200 VA Landscape

TOTAL

4.000 27.000 13.000 2.000 5.000 19.686

bh bh bh bh bh m2

Rp 176,152 Rp Rp 9,000 Rp Rp 3,000 Rp Rp 87,000 Rp Rp 90,000 Rp Rp 90,110 Rp jumlah Rp

704,606 243,000 39,000 174,000 450,000 1,773,912 3,384,518

76.500 7.500 24.000 22.000

m2 m2 m2 m2

Rp 347,075 Rp Rp 57,815 Rp Rp 200,654 Rp Rp 350,000 Rp jumlah Rp

26,551,260 433,615 4,815,703 7,700,000 39,500,579

18.901 m2 409.000 m2 51.350 m2

Rp Rp Rp jumlah

40,814 Rp 17,286 Rp 17,286 Rp Rp

10.000 1.000 3.000 4.000 4.000 11.000 50.000

bh bh bh bh bh bh m'

Rp Rp Rp Rp Rp Rp Rp jumlah

34,000 98,000 10,000 16,000 13,500 13,500 3,700

Rp Rp Rp Rp Rp Rp Rp Rp

340,000 98,000 30,000 64,000 54,000 148,500 185,000 919,500

2.000 1.000 1.000

ls ls ls

Rp 250,000 Rp 1,000,000 Rp 50,000,000 jumlah

Rp Rp Rp Rp

500,000 1,000,000 50,000,000 51,500,000

771,428 7,069,774 887,611 8,728,812

Rp807,048,901

JUMLAH

Rp Rp Rp Rp Rp Rp Rp Rp Rp

10,000,000 9,520,280 16,297,727 1,702,008 2,112,000 1,000,000 300,000 1,500,000 42,432,015

Rp Rp Rp Rp Rp Rp Rp

6,003,509 2,001,170 2,656,663 885,554 1,291,059 2,171,848 15,009,803

Rp Rp Rp

29,254,624 7,622,273 36,876,897

Rp

1,059,853

Rp

13,506,034

Rp

14,565,887

Rp Rp Rp Rp

1,413,137 16,593,128 10,557,547 28,563,811

Rp Rp Rp

7,814,285 11,588,974 19,403,260

Rp Rp Rp Rp Rp Rp Rp Rp

389,965 60,851,722 30,632,836 21,775,680 78,839,902 23,359,515 9,551,321 225,400,940

Rp Rp Rp

4,905,307 2,314,805 7,220,112

Rp Rp Rp Rp Rp Rp Rp Rp Rp

3,559,747 666,259 62,106 150,000 80,000 200,000 145,310 995,000 5,858,422

Rp Rp Rp Rp

2,203,942 2,203,942 1,200,000 5,607,883

Rp Rp

6,695,494 6,695,494

Rp Rp Rp Rp Rp Rp Rp Rp

704,606 396,000 30,672 81,000 522,000 180,000 2,885,424 4,799,702

Rp Rp Rp Rp Rp

34,881,068 433,615 4,815,703 5,267,500 45,397,886

Rp Rp Rp Rp

679,602 6,412,924 883,290 7,975,815

Rp Rp Rp Rp Rp Rp Rp Rp

102,000 1,470,000 10,000 112,000 54,000 162,000 185,000 2,095,000

Rp Rp

2,081,570 2,081,570

Rp

1,059,853

Rp

12,541,317

Rp

13,601,170

Rp Rp Rp Rp

1,302,368 10,258,326 11,638,913 23,199,606

Rp Rp Rp Rp Rp Rp Rp

22,041,234 12,807,375 199,427 31,093,634 25,613,281 4,421,469 96,176,419

Rp Rp Rp

39,239,033 13,655,359 52,894,392

Rp Rp Rp Rp Rp

3,209,210 17,678,346 371,556 2,000,608 23,259,721

Rp Rp Rp

4,929,306 2,515,558 7,444,864

Rp Rp Rp Rp Rp

3,559,747 62,106 160,000 400,000 4,181,853

Rp Rp Rp Rp

2,203,942 2,644,730 1,600,000 6,448,672

Rp Rp Rp

1,126,410 4,697,889 5,824,299

Rp Rp Rp Rp Rp Rp Rp

704,606 243,000 39,000 174,000 450,000 1,773,912 3,384,518

Rp Rp Rp Rp Rp

26,551,260 433,615 4,815,703 7,700,000 39,500,579

Rp Rp Rp Rp

771,428 7,069,774 887,611 8,728,812

Rp Rp Rp Rp Rp Rp Rp Rp

340,000 98,000 30,000 64,000 54,000 148,500 185,000 919,500

Rp Rp Rp Rp

500,000 1,000,000 50,000,000 51,500,000

Rp807,048,901

REKAPITULASI KEGIATAN : PEMBANGUNAN BANGUNAN RUMAH TINGGAL PEKERJAAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT Lokasi : Jalan Estetika Raya No.1 Tembalang, Semarang NO

JENIS PEKERJAAN

HARGA

A. LANTAI 1 I II III IV V VI VII VIII IX X XI XII XIII XIV XV

PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PONDASI PEKERJAAN DINDING PEKERJAAN PLESTERAN PEKERJAAN KUSEN KAYU PEKERJAAN BETON PEKERJAAN LANGIT-LANGIT PEKERJAAN SANITASI PEKERJAAN PLUMBING PEKERJAAN BESI DAN ALUMUNIUM PEKERJAAN KUNCI DAN KACA PEKERJAAN PENUTUP LANTAI DAN DINDING PEKERJAAN PENGECATAN PEKERJAAN INSTALASI LISTRIK JUMLAH

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

42,432,015 15,009,803 36,876,897 14,565,887 28,563,811 19,403,260 225,400,940 7,220,112 5,858,422 5,607,883 6,695,494 4,799,702 45,397,886 7,975,815 2,095,000

Rp

467,902,927

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

2,081,570 13,601,170 23,199,606 96,176,419 52,894,392 23,259,721 7,444,864 4,181,853 6,448,672 5,824,299 3,384,518 39,500,579 8,728,812 919,500 51,500,000

Rp Rp

339,145,974 807,048,901

B. LANTAI 2 XVI XVII XVIII XIX XX XXI XXII XXIII XXIV XXV XXV XXVII XXVIII

PEKERJAAN TANAH PEKERJAAN DINDING PEKERJAAN PLESTERAN PEKERJAAN KAYU PEKERJAAN BETON PEKERJAAN PENUTUP ATAP PEKERJAAN LANGIT-LANGIT PEKERJAAN SANITASI PEKERJAAN PLUMBING PEKERJAAN BESI DAN ALUMUNIUM PEKERJAAN KUNCI DAN KACA PEKERJAAN PENUTUP LANTAI DAN DINDING LT2

PEKERJAAN PENGECATAN LT2 XXIX PEKERJAAN INSTALASI LISTRIK LT2 XXX PEKERJAAN LAIN-LAIN JUMLAH JUMLAH TOTAL

TERBILANG:

+ PPN 10% Rp 80,704,890.14 JUMLAH TOTAL Rp 887,753,791.55 DIBULATKAN RP Rp 887,750,000.00 Delapan Ratus Delapan Puluh Tujuh Juta Tujuh Ratus Lima Puluh Ribu Rupiah

Semarang, Oktober 2015 Perencana

Muhammad Nur Azzam

BILL OF QUANTITY KEGIATAN : PEMBANGUNAN BANGUNAN RUMAH & TOKO PEKERJAAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT Lokasi : Jalan Estetika Raya No.1 Tembalang, Semarang NO

KODE

JENIS PEKERJAAN

SATUAN

VOLUME

A. LANTAI 1 PEKERJAAN PERSIAPAN

I A.2.2.1.2 A.2.2.1.4 A.2.2.1.5 A.2.2.1.7 A.2.2.1.9 Taksir Taksir

Pagar Sementara dari Seng Gelombang Tinggi 2,00 m Pengukuran dan Pemasangan Bouwplank Pembuatan Kantor Sementara dg Lantai Plesteran Pembuatan Gudang Semen dan Alat-alat Membersihkan Lapangan dan Perataan Air kerja dan listrik Papan Nama Proyek

m' m' m2 ls m2 ls ls

30.000 70.000 9.000 1.000 200.000 1.000 1.000

II 1 2 3 4 5 6

A.2.3.1.1 A.2.3.1.9 A.2.3.1.2 A.2.3.1.9 A.2.3.1.11 A.2.3.1.11

PEKERJAAN TANAH Menggali Tanah Biasa Sedalam 1 m Pengurugan Kembali Menggali Tanah Biasa Sedalam 2 m Pengurugan Kembali Urugan Pasir Bawah Pondasi Urugan Pasir Bawah Lantai lt 1

m3 m3 m3 m3 m3 m3

122.097 40.699 44.064 14.688 6.750 11.355

III 1 2

A.3.2.1.7 A.3.2.1.9

PEKERJAAN PONDASI Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP Pemasang Batu Kosong/Anstamping

m3 m3

42.590 18.360

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP

m2

20.250

2

A.4.4.1.11 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP

m2

280.000

V 1 2 3

PEKERJAAN PLESTERAN A,4,4,2.3 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm A,4,4,2.6 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm A,4,4,2.27 Pemasangan Acian

m2 m2 m2

27.000 344.000 371.000

VI 1 2

A.4.6.1.1 A.4.6.1.5

Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II

m3 m3

0.291 16.360

PEKERJAAN BETON Membuat Lantai Kerja Beton Mutu K(100) Membuat Beton Mutu K(250) Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting) Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) Membuat Balok Beton Bertulang (200 kg Besi + Bekisting) Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)

m3 m3 m3 m3 m3 m3 m3

0.450 13.060 8.127 4.725 9.805 3.695 1.643

1 2 3 4 5 6 7

IV 1

VII 1 2 3 4 5 6 7

PEKERJAAN DINDING A.4.4.1.8

PEKERJAAN KUSEN KAYU

A.4.1.1.4

A.4.1.1.6 A.4.1.1.28 A.4.1.1.29 A.4.1.1.30 A.4.1.1.31 A.4.1.1.34

VIII 1 2

Hitung Hitung

PEKERJAAN LANGIT-LANGIT Langit-langit Gypsum Board & Rangka Allumunium (Concealed) List Gypsum

m2 m'

51.100 113.000

IX 1 2 3 4 5 6 7 8

A.5.1.1.1 A.5.1.1.5 A.5.1.1.14 Hitung Hitung Hitung A.5.1.1.19 Hitung

PEKERJAAN SANITASI Memasang Closet Duduk / Mono Blok Memasang Wastafel + Kran Pemasangan Floor Drain Memasang Soap Holder Memasang Paper Holder Memasang Shower dan Kran Memasang Kran Air Memasang Pompa Air (Sanyo)

Unit Unit bh bh bh bh bh Unit

2 1 2 2 1 1 2 1

X 1 2 3

PEKERJAAN PLUMBING A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø ½" A.5.1.1.31 Pemasangan Pipa PVC tipe AW Ø 4" Hitung Septictank + peresapan

m' m' Unit

50.000 50.000 1

XI 1

Hitung

PEKERJAAN BESI DAN ALUMUNIUM Memasang Railling Tangga

m'

225.000

XII 1 2 3 4 5 6 7

A.4.6.2.2 A.4.6.2.5 A.4.6.2.9 Hitung Hitung Hitung A.4.6.2.16

PEKERJAAN KUNCI DAN KACA Memasang Kunci Tanam Memasang Engsel Pintu dan Jendela Pasang Kait Angin lt1 Pasang Grendel Pasang Pull Handle Pasang Handle Biasa Pasang Kaca tebal 5 mm lt1

bh bh bh bh bh bh m2

4 44 1 27 6 2 32.021

XIII 1 2 3 4

A.4.4.3.9 A.4.4.3.36 A.4.4.3.50 Hitung

PEKERJAAN PENUTUP LANTAI DAN DINDING Pemasangan lantai Ubin Granito Uk. 40 x 40 cm Pemasangan Lantai Keramik 20 x 20 cm Pemasangan Dinding Keramik 20 x 25cm Pemasangan dinding marmer 20x40

m2 m2 m2 m2

100.500 7.500 24.000 15.050

XIV 1 2 3

PEKERJAAN PENGECATAN A.4.7.1.7 Pelaburan Bidang Kayu dg Politur A.4.7.1.10 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar A.4.7.1.10 Pengecatan Plafond

m2 m2 m2

16.651 371.000 51.100

PEKERJAAN INSTALASI LISTRIK Lampu Spiral Kuning ( Teras ) Lampu LED ( Dipasang Dalam Plafond ) Saklar Tunggal Saklar Ganda Stop Kontak Instalasi Titik Lampu Kabel NYA

bh bh bh bh bh bh m1

3 15 1 7 4 12 50

XV 1 2 3 4 5 6 7

Hitung Hitung Hitung Hitung Hitung Hitung Hitung

XVI 1

B. LANTAI 2 PEKERJAAN TANAH A.2.3.1.11 Urugan pasir bawah lantai 2

XVII 1

A.4.4.1.8

m3

10.883

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP

m2

20.250

A.4.4.1.11 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP

m2

260.000

XVIII 1 2 3

PEKERJAAN PLESTERAN A,4,4,2.3 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm A,4,4,2.6 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm A,4,4,2.27 Pemasangan Acian

m2 m2 m2

27.000 196.000 409.000

XIX 1 2 3 4 5 6

A.4.6.1.1 A.4.6.1.5 A.4.6.1.15 A.4.6.1.17 A.4.6.1.14 A.4.6.1.22

m3 m2 m1 m2 m3 m1

0.821 18.080 2.880 169.000 0.877 36.900

XX 1 2

PEKERJAAN BETON A.4.1.1.30 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) A.4.1.1.31 Membuat Ring Balok Beton Bertulang

m3 m3

4.880 2.160

XXI 1 2 3 4

A.4.5.2.6 A.4.5.2.30 A.4.5.2.34 A.4.5.2.42

PEKERJAAN PENUTUP ATAP Pemasangan Bubugan Genteng Beton Pemasangan Atap Genteng Beton Pemasangan Nok Genteng Beton Pasang Allumunium Foil / Sisalation

m1 m2 m1 m2

34.400 169.000 3.500 83.070

XXII 1 4

Hitung Hitung

PEKERJAAN LANGIT-LANGIT Langit-langit Gypsum Board & Rangka Allumunium (Concealed) List Gypsum

m2 m1

51.350 122.800

XXIII 1 2 3 5

A.5.1.1.1 A.5.1.1.14 Hitung Hitung

PEKERJAAN SANITASI Memasang Closet Duduk / Mono Blok Pemasangan Floor Drain Memasang Soap Holder Memasang Shower dan Kran

Unit bh bh bh

2.000 2.000 2.000 2.000

XXIV 1 2 3

PEKERJAAN PLUMBING A.4.7.1.12 Pemasangan Pipa PVC tipe AW Ø ½" A.4.7.1.13 Pemasangan Pipa PVC tipe AW Ø 4" Hitung Memasang Roof Tank

m' m' Unit

50.000 60.000 1.000

XXV 4 6

PEKERJAAN BESI DAN ALUMUNIUM A.4.2.1.11 Pemasangan Ralling Balkon 5 x 5 A.4.2.1.18 Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm

m' m'

10.000 27.200

2

PEKERJAAN DINDING

PEKERJAAN KAYU Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II Pemasangan konstruksi Gording, Kayu Klas II Pemasangan Rangka Atap Genteng Beton, Kayu Klas II Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Klas I Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II

XXVI 1 2 3 4 5 6

A.4.6.2.2 A.4.6.2.5 Hitung Hitung Hitung A.4.6.2.16

PEKERJAAN KUNCI DAN KACA Memasang Kunci Tanam Memasang Engsel Pintu dan Jendela Pasang Grendel Pasang Pull Handle Pasang Handle Biasa Kaca tebal 3 mm

bh bh bh bh bh m2

4.000 27.000 13.000 2.000 5.000 19.686

A.4.4.3.9 A.4.4.3.36 A.4.4.3.36 A.4.4.3.50 Hitung

PEKERJAAN PENUTUP LANTAI DAN DINDING LT2 Pemasangan lantai Ubin Granito Uk. 40 x 40 cm Pemasangan lantai teras Uk. 40 x 40 cm Pemasangan Lantai Keramik 20 x 20 cm Pemasangan Dinding Keramik 20 x 25cm Pemasangan dinding marmer 20x40

m2 m2 m2 m2 m2

76.500 10.500 7.500 24.000 22.000

XXVIII PEKERJAAN PENGECATAN LT2 1 A.4.7.1.7 Pelaburan Bidang Kayu dg Politur 2 A.4.7.1.10 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 3 A.4.7.1.10 Pengecatan Plafond

m2 m2 m2

18.901 409.000 51.350

XXIX 1 2 3 4 5 6 7

Hitung Hitung Hitung Hitung Hitung Hitung Hitung

PEKERJAAN INSTALASI LISTRIK LT2 Lampu LED ( Dipasang Dalam Plafond ) Lampu spiral kuning ( teras ) Saklar Tunggal Saklar Ganda Stop Kontak Instalasi Titik Lampu Kabel NYA

bh bh bh bh bh bh m'

10.000 1.000 3.000 4.000 4.000 11.000 50.000

Taksir Taksir Taksir

PEKERJAAN LAIN-LAIN Penangkal Petir Penyambungan daya ke PLN 2200 VA Landscape

ls ls ls

2.000 1.000 1.000

XXVII 1 2 3 4 5

XXX 1 2 3

VOLUME

30.000 70.000 9.000 1.000 200.000 1.000 1.000

122.097 40.699 44.064 14.688 6.750 11.355

42.590 18.360

20.250 280.000

27.000 344.000 371.000

0.291 16.360

0.450 13.060 8.127 4.725 9.805 3.695 1.643

51.100 113.000

2 1 2 2 1 1 2 1

50.000 50.000 1

225.000

4 44 1 27 6 2 32.021

100.500 7.500 24.000 15.050

16.651 371.000 51.100

3 15 1 7 4 12 50

10.883

20.250 260.000

27.000 196.000 409.000

0.821 18.080 2.880 169.000 0.877 36.900

4.880 2.160

34.400 169.000 3.500 83.070

51.350 122.800

2.000 2.000 2.000 2.000

50.000 60.000 1.000

10.000 27.200

4.000 27.000 13.000 2.000 5.000 19.686

76.500 10.500 7.500 24.000 22.000

18.901 409.000 51.350

10.000 1.000 3.000 4.000 4.000 11.000 50.000

2.000 1.000 1.000

PERHITUNGAN VOLUME PEKERJAAN NO

GAMBAR

PERHITUNGAN

LANTAI 1 I PEKERJAAN PERSIAPAN 1 Pembersihan Lahan Volume

= = =

Luas area 10 x 20 200 m2

2 Pemasangan pagar sementara

Volume

= =

Keliling area 30 m1

3 Pemasangan Bouwplank

Volume

= =

35.000 70

x m1

2

Volume

=

1.44

+

1

II PEKERJAAN TANAH 1 Galian Tanah Untuk Pondasi

2

Volume

=

90.585

=

0.9

m3

+

1.12

2 =

Volume

= = =

Total

= =

2 Galian Tanah Untuk Footplat

m3

29.997

p

x 5.05

l x

122.097

0.6 m

3

1.515 90.585

x

+

29.997 m3

Volume

= =

p

x 1.2

l x

x 1.2

=

44.064

m

= =

122.097 40.699

/ m3

3

3 Urugan Tanah Kembali Untuk Pondasi Volume

4 Urugan Tanah Kembali Untuk footplat Volume

= =

Volume

= =

44.064 14.688

/ m3

5 Urugan Pasir Bawah Pondasi

Volume

Volume

Total

1

x

0.1

6.75

m

= =

0.9 x 2.43

m

= =

0.6 x 0.303

m3

=

6.75

+

2.43 m3

x m3

1.2

=

3

0.1 3

0.1

9.48

6 Urugan Pasir Bawah Footplat Volume

= =

1.2 0.45

Volume

= = =

Lbangunan

7 Urugan Pasir Bawah Lantai x x m3

113.55 11.355

8 Urugan Pasir Carport Volume

= = =

Volume

= =

1.0 x 13.5

=

0.9

Lcarport 92.0 9.2 m3

III PEKERJAAN PONDASI 1 Pekerjaan pondasi batu kosong ( Aanstamping)

Volume

x

0.2 m

3

0.2

x x

Total

=

4.86

m3

=

13.5

+

=

18.36

4.86 m3

2 Pekerjaan pondasi batu belah Volume

=

0.8

+

0.3

2 =

Volume

m3

29.7

=

0.8

+

0.3

2 =

m3

11.88

Volume

= =

0.4 1.01

x m3

0.5

Total

=

29.7

+

11.88 m3

+

1.2

=

42.59

IV PEKERJAAN BETON 1 Footplat Volume

=

0.25 2 1.2

x =

Volume

0.25 x

2 Pedestal

m3

3.77

=

=

x

+ 2 1.2

2.82

1 x m3

Volume

Total

= = = = =

p

x

0.25 1.541

l x m3

x 0.25

3.77

+

2.82 m3

8.1

3 Lantai Kerja Volume

= =

1 0.45

x m3

0.05

Volume

= =

1 0.4

x m3

0.05

Total

=

0.45

+

= 5 Sloof Sloof 20 x 25

6 Kolom Kolom 25 x 25

Volume

Volume

b

= =

p

Volume

= = =

x

h x m3

x 0.25

0.25

l x

x 0.25

4.25

m3

0.2 4.725

=

Kolom 15 x 15

m

0.85

= = =

0.4 3

x

p

x 0.15 0.54

l x m3

x 0.15

Kolom Pagar Volume

= =

0.15 0.135

x m3

0.15

Total

=

8.5

+

1.17 m3

=

9.805

7 Balok Balok 20 x 25

Balok 15 x 20 (anak)

8 Tangga

Volume

Volume

Volume anak tangga

= = =

b

= =

b

= =

x

0.2 3.695

x

0.2 3.375

a

x 2 x

0.3

h x m3

x 0.25

h x m3

x 0.25

o

x

0.25 2

Volume tebal tangga

Total

=

0.563

m3

=

l

h

x

= =

1.00 1.08

x m3

0.12

=

0.563

+

1.08 m3

x x m2

t 4.00

x x

t 1.50

= PEKERJAAN DINDING 1 Pas. Dinding batu bata 1 : 6 ( 1/2 bata ) uk.5x11x22

2 Pas. Dinding batu bata 1 : 3 ( 1/2 bata ) uk.5x11x22 (Trasram Kelliling)

Volume

Volume

x

1.643

= = =

Ptotal

= =

Ptotal

70 280

13.5

Total

=

20.25

m2

=

280

+

= 3 Plesteran dinding tebal 15 mm 1 : 6

4 Plesteran dinding tebal 15 mm 1 : 3

5 Acian

Volume

Volume

Volume

300.25

= =

2

= =

2

= =

20.25 m2

x

172 m2

x 27

13.5 m2

344 371

+ m2

344

27.00

PAGAR 1 Pas. Dinding batu bata 1 : 6 ( 1/2 bata ) uk.5x11x22

Volume

= =

8 16

x m2

2.00

2 Plesteran dinding tebal 15 mm 1 : 6

Volume

= =

8 16

x m2

2.00

3 Acian

Volume

=

8 16

x m2

2.00

Volume

= = =

PEKERJAAN KUSEN 1 Kusen Pintu dan Jendela a. Desain Pintu dan Jendela

=

( 0.060 x 0.077 x jumlah 0.077 x 2 m3 0.155

b. Desain Pintu Garasi (P1) Volume

= = = =

( 0.060 x 0.047 x jumlah 0.047 x 1 m3 0.047

c. Desain P2 Volume

= = = =

( 0.060 x 0.035 x jumlah 0.035 x 1 m3 0.035

=

(

d. Desain Jendela J1 Volume

0.060

x

Total

= =

0.055 0.055

=

0.055

x jumlah x 1 3 m

=

0.155

+

=

0.291

0.047 m3

PEKERJAAN DAUN KUSEN 1 Kusen Pintu a. Desain Pintu Jendela 1 Volume

= = =

0.75 1.080 1.080

- 0.390 x jumlah x 2 2 m

=

2.160

= = =

1.2 2.360 2.360

=

9.440

- 0.610 x jumlah x 4 3 m

Total

=

11.600

m3

Volume

= = =

1 1.960 1.960

=

1.960

- 0.510 x jumlah x 1 2 m

= = =

1.6 2.800 2.800

=

2.800

= =

11.600

b. Desain Pintu Garasi P1

c. Desain Pintu P2 Volume

TOTAL

16.360

- 0.900 x jumlah x 1 2 m

+ m2

1.960

PEKERJAAN PENUTUP LANTAI DAN DINDING 1 Keramik Lantai Toko (Platinum) 50x50 Volume

=

42.000

m2

2 Keramik Lantai Rumah (Platinum) 40x40

Volume

=

58.5

m2

3 Keramik km/wc (Asia Tile) 20x20

Volume

=

7.5

m2

4 Keramik Dinding km/wc (Asia Tile) 20x25

Volume

=

24

m2

5 Keramik Dinding Marmer ( 20 x 40 )

Volume

=

15.05

m2

PEKERJAAN LANGIT LANGIT 1 Plafond Gypsumboard Rangka Hollow Lantai 1

Volume

=

51.1

m2

2 List Plafond Lantai 1

1 2 3 4 5 6 7

PEKERJAAN ELEKTRIKAL LISTRIK Lampu Spiral Kuning ( Teras ) Lampu LED ( Dipasang Dalam Plafond ) Saklar Tunggal Saklar Ganda Stop Kontak Instalasi Titik Lampu Kabel NYA

Volume

= =

Volume Volume Volume Volume Volume Volume Volume

= = = = = = =

2

x 56.500 113.000 m' 3 15 1 7 4 12 50

bh bh bh bh bh bh m'

PEKERJAAN SANITASI Memasang Kloset Duduk Memasang Westafel + Kran Memasang Floor Drain Memasang Soap Holder Memasang Paper Holder Memasang Shower dan Kran Memasang Kran Air Mesin pompa sanyo

2 1 2 2 1 1 2 1

bh bh bh bh bh bh bh bh

Volume =

50

m'

- Pipa Air kotor PVC Ø 4'' kotor

Volume =

50

m'

3 Septictank + peresapan

Volume =

1

unit

1 2 3 4 5 6 7 8

Volume Volume Volume Volume Volume Volume Volume Volume

= = = = = = = =

PEKERJAAN PLUMBING 1 Pemipaan Air Bersih Pengadaan & pemasangan pemipaan air bersih dari tandon air ke titik pelayanan, bahan PVC AW klas 10 K lengkap terpasang termasuk fitting galian, hanger, gantungan, dan bobokan. - Pipa Air bersih PVC Ø 1/2'' bersih 2 Pemipaan Air kotor Pengadaan dan pemasangan pemipaan air bekas Bahan PVC AW klas 10 K, lengkap terpasang, termasuk fitting, galian, hanger, gantungan, bobokan.

PEKERJAAN KUNCI DAN KACA 1 Handle Pintu Pull Handle

3 Engsel Pintu dan Jendela

4 Kunci Tanam Pull Handle

Biasa

PJ P1 P2 Total

= = = =

2 2

PJ P1 P2 P3 J3 Total

= = = = = =

12 12 3 3 2

PJ P1 Total P2

x x 6

2 1

= =

buah x x x x x

44

2 1 1 1 1 buah

= = =

1 x 1 x 3

2 = 1 = buah

=

1

x

1

= = = = =

=

5 Kaca tebal 5 mm Lantai 1

PEKERJAAN BESI DAN ALUMINIUM 1 Memasang Railling Tangga Besi Stainless 5 x 5

P3 Total

= =

PJ

=

0.390

x 2

P1

=

0.510

x 5

J1

=

3.270

x 3

Total

=

Volume

= =

1 x 2

1 = buah

13.14

7.5

x 225.000

m2

30 m1

PEKERJAAN FINISHING 1 Cat Dinding " Mowileks "

Volume

=

476

m2

2 Cat Plafond " Mowileks " 3 Cat Kusen " Mowileks "

Volume

= =

108 2

m2 11.862

=

23.724

m2

Volume

=

90

m1

Volume

= = =

L x 108.83 10.88

= = =

L x 108.83 13.06

h x

= =

1

x

0.15

m

Volume

x

PEKERJAAN LAIN-LAIN 1 Pekerjaan Lanscaping

LANTAI 2 1 Pekerjaan Urugan Pasir Bawah Lantai

h x

0.1 m3

PEKERJAAN BETON 1 Pelat Lantai Volume

0.12 m3

2 Topi-Topi Volume

3 Kolom

3

1.5

Kolom 25 x 25

4 Kolom 15 x 15

Volume

Volume

= = =

p

= = =

p

x 0.25

l x

4.25

m3

x 0.15

l x

0.63

m3

x 0.25

x 0.15

5 Ring Balok Ring Balok 15 x 20

PEKERJAAN DINDING 1 Pas. Dinding batu bata 1 : 6 ( 1/2 bata ) uk.5x11x22

2 Pas. Dinding batu bata 1 : 3 ( 1/2 bata ) uk.5x11x22 kamar mandi

3 Plesteran dinding tebal 15 mm 1 : 6

4 Plesteran dinding tebal 15 mm 1 : 3

5 Acian

6 Sponengan

Volume

Volume

Volume

Volume

Volume

Volume

Volume

= =

b 0.15

h x

2.16

m3

= = =

Ptotal 65

x x

260

m2

= = =

Ptotal 13.5

x x

20.25

m2

= =

2

= =

2

x

x 196

x 0.2

t 4.00

t 1.50

98 m2

x

13.5

27

m2

= =

364

+

409

m

= =

2

x

286

m2

45.000

2

142.90

PEKERJAAN KUSEN 1 Kusen Pintu dan Jendela a. Desain Pintu dan Jendela Volume

= = =

( 0.060 x 0.071 x jumlah 0.071 x 1

=

0.071

m3

c. Desain P2 Volume

= = =

( 0.060 x 0.035 x jumlah 0.035 x 4

=

0.141

m3

c. Desain Jendela J2 Volume

= = =

( 0.060 x 0.057 x jumlah 0.057 x 2

=

0.115

= = =

( 0.060 x 0.156 x jumlah 0.156 x 3

=

0.468

= = =

( 0.060 x 0.026 x jumlah 0.026 x 1

=

0.026

m3

d. Desain Jendela J3 Volume

m3

e. Desain Bouven (BV) Volume

TOTAL

= =

PEKERJAAN DAUN KUSEN 1 Kusen Pintu dan Jendela a. Desain Pintu Jendela 1

Volume

m3

0.071 + + 0.026 0.821

0.141 m3

= = =

0.75 1.080 1.080

=

2.160

- 0.390 x jumlah x 2 m2

= =

1.2 2.360

x

0.610 jumlah

=

2.360

=

4.720

x m3

2

Total

=

6.880

m3

Volume

= = =

1.6 2.800 2.800

=

5.600

- 0.900 x jumlah x 2 2 m

b. Desain Pintu P2

b. Desain Jendela J2 Volume

TOTAL

= = =

1.6 2.800 2.800

=

5.600

- 0.900 x jumlah x 2 2 m

= =

6.880

+

5.600

18.080

m3

PEKERJAAN PENUTUP LANTAI DAN DINDING 1 Keramik Lantai (Platinum) 40x40 Volume

=

76.500

m2

2 Keramik Lantai Teras) 40x40

Volume

=

10.500

m2

3 Keramik Dinding marmer 20x40

Volume

=

22.000

m2

4 Keramik km/wc (Asia Tile)20x20

Volume

=

7.5

m2

5 Keramik Dinding km/wc (Asia Tile) 20x25

Volume

=

24

m2

PEKERJAAN LANGIT LANGIT 1 Plafond Gypsumboard Rangka Hollow Lantai 1 2 List Plafond Lantai 1

Volume Volume

= = =

1 2 3 4 5 6 7

PEKERJAAN ELEKTRIKAL LISTRIK Lampu LED ( Dipasang Dalam Plafond ) Lampu spiral kuning ( teras ) Saklar Tunggal Saklar Ganda Stop Kontak Instalasi Titik Lampu Kabel NYA

Volume Volume Volume Volume Volume Volume Volume

= = = = = = =

10 1 3 4 4 11 50

bh bh bh bh bh bh m'

1 2 3 5

PEKERJAAN SANITASI Memasang Kloset Duduk Memasang Floor Drain Memasang Soap Holder Memasang Shower dan Kran

Volume Volume Volume Volume

= = = =

2 2 2 2

bh bh bh bh

PEKERJAAN PLUMBING 1 Pemipaan Air Bersih Pengadaan & pemasangan pemipaan air bersih dari tandon air ke titik pelayanan, bahan PVC AW klas 10 K lengkap terpasang termasuk fitting galian, hanger, gantungan, dan bobokan.

51.1 m2 2 x 56.500 113.000 m'

Volume =

50

m'

- Pipa Air kotor PVC Ø 3'' kotor

Volume =

60

m'

3 Memasang Roof Tank

Volume =

1

unit

- Pipa Air bersih PVC Ø 2'' bersih 2 Pemipaan Air kotor Pengadaan dan pemasangan pemipaan air bekas Bahan PVC AW klas 10 K, lengkap terpasang, termasuk fitting, galian, hanger, gantungan, bobokan.

PEKERJAAN KUNCI DAN KACA 1 Handle Pintu Pull Handle Biasa

2 Engsel Pintu

3 Kunci Tanam Pull Handle Biasa

PJ

=

2

P2 P3 Total

= = =

1 x 1 x 5

4 = 1 = buah

PJ P2 P3 Total

= = = =

12 x 3 x 3 x 27

1 = 4 = 1 = buah

PJ

=

1

P2 P3 Total

= = =

1 x 1 x 5

PJ P2 P3 Total

= = = =

8 1 1

PJ1

=

4.968

x 1

P3

=

0.998

x 1

J2

=

7.193

x 1

J4

=

2.822

x 1

BV

=

0.264

x 2

x

x

1

=

1

=

4 = 1 = buah

4 Grendel

5 Kaca tebal 5 mm

x x x 13

1 4 1

Total

=

15.981

PEKERJAAN KAYU 1 Lisplank 3/30

Volume

=

36.900

m'

2 Rangka Atap

Volume

=

169.0

m2

3 Talang Datar Seng BJLS

Volume

=

24.000

m'

4 Nok 8/12

Volume

=

8.000

m'

5 Reuter 2/20

Volume

=

8.000

m'

= = = buah

m2

KONSTRUKSI KUDA-KUDA 1 kuda-kuda bentang 7 meter

balok tarik 8/12 kaki kuda2 8/12 makelar 8/12 balok sokong 8/1 balok 4/12gapit

Total

2 Gording

3 Kerpus 4 Mur Baut

= = =

= =

0.0096 0.0096 0.0096 0.0096 0.0096

= =

0.219 0.219 0.877

Panjang = Volume = =

30 30

Panjang = vol =

32.6 200

x x x x x

x x kg m' x

2.880

0.096 m3

m' bh

PEKERJAAN PENUTUP ATAP 1 Pasang Bubugan Genteng Beton 2 Pasang Atap Genteng Beton

Volume

=

34.400

m1

Volume

=

169.00

m2

3 Alumunium Foil

Volume

=

27.20

m2

Volume

=

10.0

m1

1 Cat Dinding " Mowileks "

Volume

=

336.000

2 Cat Plafond " Mowileks " 3 Cat Kusen " Mowileks "

Volume Volume

= =

94.500 m2 2 x 12.706

=

25.411

m2

=

2

titik

PEKERJAAN BESI DAN ALUMINIUM 1 Memasang Railling Balkon Besi Stainless 5 x 5 PEKERJAAN FINISHING

PEKERJAAN LAIN-LAIN 1 Pekerjaan Penangkal Petir

Volume

m2

KERJAAN PERHITUNGAN

2

1 2

1.12 2

x

1.1

x

67.5

x

1.1

x

27

t 0.6

x

0.5

29.997

+

1.515

t 1.2

3

x x

jml 1.8

x

17

3

x

67.5

x

27

x

5.05

2.43

+

0.303

1.2

x

0.1

t 0.1

t 0.1

x

67.5

x

27

x

17

4.86

0.3

x

0.8

x

67.5

x

0.8

x

27

0.5

x

5.05

11.88

+

1.01

2

0.3 2

1.2 2

x 0.15 + 1.2 x

0.2

x 0.15 + 1.0 x

0.2

9

1 2 8

t 0.25

x x

jml 1.45

2.82

+

1.541

x

17

0.05

x

1

x

9

0.05

x

1

x

8

p 0.25

x

94.5

t 0.25

x x

jml 4

x

17

t 0.15

x x

jml 4

x

6

0.4

0.15

x

1.5

1.17

+

0.135

x

4

p 0.25

x

73.9

p 0.25

x

67.5

p

x

jmlh

x

1

x

x

9

p 0.12

1.08

4.00

1.50

15

20.25

27.00

2.00

2.00

2.00

0.120 jumlah 2

)

x

10.760

0.120 jumlah 1

)

x

6.500

0.120 jumlah 1

)

x

4.800

0.120

)

x

7.600

jumlah 1

0.047

+

0.035

+

0.055

0.390 jumlah 2

x

3

0.610 jumlah 4

x

4

0.510 jumlah 1

x

4

0.900 jumlah 1

x

4

1.960

+

2.800

4 buah 2 buah

24 12 3 3 2

buah buah buah buah buah

2 buah 1 buah

1 buah

1 buah

=

0.78

m2

=

2.55

m2

=

9.81

m2

0.1

0.12

1.5

x

0.1

t 0.25

x x

jml 4

x

17

t 0.15

x x

jml 4

x

7

p 0.2

x

72

4.00

1.50

45.000

142.90

0.120 jumlah

)

x

10.760

0.120 jumlah

)

x

4.800

0.120 jumlah

)

x

7.970

0.120 jumlah

)

x

21.670

0.120 jumlah

)

x

3.560

0.141

+

0.115

0.390 jumlah 2

x

3

0.610 jumlah

x

4

+

0.468

2

0.900 jumlah 2

x

4

0.900 jumlah 2

x

4

5.600

+

5.600

2 buah 4 buah 1 buah

12 buah 12 buah 3 buah

1 buah 4 buah 1 buah

8 buah 4 buah 1 buah buah =

4.968

m2

=

0.998

m2

=

7.193

m2

=

2.822

m2

=

0.528

m2

7.03 7.50 2.00 3.12 3.20

jumlah 4

0.096

= = = = =

0.067 0.072 0.019 0.030 0.031

Contoh Perhitungan Human Resources Pemasangan Plesteran 1 Pc : 5 Pp Volume Durasi Volume/Minggu

Tebal 15 mm = 105.60 m2 = 2.000 minggu = 52.800 m2

Melihat tabel abk 5-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga 1 Pekerja = 0.20 x 2 Tukang Batu = 0.10 x 3 Kepala Tukang = 0.01 x 4 Mandor = 0.01 x Bahan 1 sak portland semen 40 kg 1 Portland Cement (PC)

=

3.25

x

Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga 1 Pekerja = 10.56 : 2 Tukang Batu = 5.28 : 3 Kepala Tukang = 0.53 : 4 Mandor = 0.53 :

52.80 52.80 52.80 52.80

= = = =

10.56 5.28 0.53 0.53

52.80

=

172

6 6 6 6

= = = =

1.76 0.88 0.09 0.09

3

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP Volume Durasi Volume/Minggu

= = =

280 m2 2 minggu 140 m2

Melihat tabel abk 4-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga 1 Pekerja = 0.30 x 2 Tukang Batu = 0.1 x 3 Kepala Tukang = 0.01 x 4 Mandor = 0.015 x

140.00 140.00 140.00 140.00

= = = =

42.00 14.00 1.40 2.10

Bahan 1 sak portland semen 40 kg Bata Merah 5 x 11 x 22 1 Portland Cement (PC) Pasir Pasang

140.00 140.00 140.00

= = =

9800 1,165 6.86

6 6 6 6

= = = =

7.00 2.33 0.23 0.35

27.00 27.00 27.00

= = =

8.10 4.05 0.41

= = =

70 8.32 0.049

x x x

Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga 1 Pekerja = 42.00 : 2 Tukang Batu = 14.00 : 3 Kepala Tukang = 1.40 : 4 Mandor = 2.10 :

4

Pemasangan Plesteran 1Pc : 3pp t=15 mm Volume Durasi Volume/Minggu

= = =

27.00 m2 1 minggu 27 m2

Melihat tabel abk 5-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga 1 Pekerja = 0.3 x 2 Tukang Batu = 0.15 x 3 Kepala Tukang = 0.015 x

4 Mandor

=

0.015

x

Bahan 1 sak portland semen 40 kg 1 Portland Cement (PC) Pasir Pasang

= =

7.776 0.023

x x

Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga 1 Pekerja = 8.10 : 2 Tukang Batu = 4.05 : 3 Kepala Tukang = 0.41 : 4 Mandor = 0.41 :

27.00

=

0.41

27.00 27.00

= =

210.0 0.62

6 6 6 6

= = = =

1.35 0.68 0.07 0.07

5

Pemasangan Plesteran 1Pc:6pp t=15mm Volume Durasi Volume/Minggu

= = =

344.0 m2 2 minggu 172 m2

Melihat tabel abk 5-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga 1 Pekerja = 0.3 x 2 Tukang Batu = 0.15 x 3 Kepala Tukang = 0.015 x 4 Mandor = 0.015 x Bahan 1 sak portland semen 40 kg 1 Portland Cement (PC) Pasir Pasang

= =

4.42 0.03

x x

Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga 1 Pekerja = 51.6 : 2 Tukang Batu = 25.80 : 3 Kepala Tukang = 2.58 : 4 Mandor = 2.58 :

6

172.00 172.00 172.00 172.00

172.00 172.00

6 6 6 6

= = = =

51.60 25.80 2.58 2.58

= =

759.6 4.6

= = = =

8.60 4.30 0.43 0.43

Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I Volume Durasi Volume/Minggu

= = =

0.29 m3 2 minggu 0.145512 m3

Melihat tabel abk 6-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga Pekerja = 7.00 x Tukang Kayu = 21.00 x Kepala Tukang = 2.10 x Mandor = 0.35 x

0.146 0.146 0.146 0.146

= = = =

1.02 3.06 0.31 0.05

Bahan Kayu Klas I (Jati) , Balok Paku Biasa 2" - 5 " Lem Kayu

= = =

1.1 1.25 1

x x x

Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga Pekerja = 1.02 : Tukang Kayu = 3.06 : Kepala Tukang = 0.31 : Mandor = 0.05 :

0.146 0.146 0.146

= = =

0.16 0.18 0.15

6 6 6 6

= = = =

0.17 0.51 0.05 0.01

7

Pelaburan Bidang Kayu dg Politur Volume Durasi Volume/Minggu

= = =

16.65 m2 2 minggu 8.33 m2

Melihat tabel abk 14-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga Pekerja = 0.04 x Tukang kayu = 0.06 x Kepala Tukang = 0.016 x Mandor = 0.003 x

8.33 8.33 8.33 8.33

= = = =

0.33 0.50 0.13 0.02

Bahan Politur Politur Jadi Ampelas

8.33 8.33 8.33

= = =

1 3 16.65

6 6 6 6

= = = =

0.06 0.08 0.02 0.00

= = =

0.15 0.37 2.00

x x x

Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga Pekerja = 0.33 : Tukang kayu = 0.50 : Kepala Tukang = 0.13 : Mandor = 0.02 :

8

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP Volume Durasi Volume/Minggu

= = =

260.00 2 minggu 130.00 m2

Melihat tabel abk 4-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga Pekerja = 0.3 x Tukang Batu = 0.1 x Kepala Tukang = 0.01 x

130.00 130.00 130.00

= = =

39.00 13.00 1.30

Mandor

=

0.015

x

Bahan Bata Merah 5 x 11 x 22 Portland Semen Pasir Pasang

= = =

70 8.32 0.049

x x x

Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga Pekerja = 39.00 : Tukang Batu = 13.00 : Kepala Tukang = 1.30 : Mandor = 1.95 :

130.00

130.00 130.00 130.00

6 6 6 6

=

1.95

= = =

9100 1,082 6.4

= = = =

6.50 2.17 0.22 0.33

9

Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm Volume Durasi Volume/Minggu

= = =

196.00 2 minggu 98.00 m2

Melihat tabel abk 5-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga Pekerja = x 0.3 Tukang batu = x 0.15 Kepala Tukang = x 0.015 Mandor = x 0.015

98.00 98.00 98.00 98.00

= = = =

29.40 14.70 1.47 1.47

Bahan Portland Semen Pasir Pasang

98.00 98.00

= =

762.0 2.25

6 6 6 6

= = = =

4.90 2.45 0.25 0.25

= =

7.78 0.023

x x

Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga Pekerja = 29.4 : Tukang batu = 14.70 : Kepala Tukang = 1.47 : Mandor = 1.47 :

10

Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I Volume Durasi Volume/Minggu

= = =

0.82 m3 3 minggu 0.274 m3

Melihat tabel abk 6-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga Pekerja = 7.00 x Tukang Kayu = 21.00 x Kepala Tukang = 2.10 x Mandor = 0.35 x

0.274 0.274 0.274 0.274

= = = =

1.92 5.75 0.57 0.10

Bahan Kayu Klas I (Jati) , Balok Paku Biasa 2" - 5 "

0.274 0.274

= =

0.30 0.34

= =

1.1 1.25

x x

Lem Kayu

=

1

x

Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga Pekerja = 1.92 : Tukang Kayu = 5.75 : Kepala Tukang = 0.57 : Mandor = 0.10 :

0.274

=

0.27

6 6 6 6

= = = =

0.32 0.96 0.10 0.02

11

Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) Volume Durasi Volume/Minggu

= = =

4.88 m3 2 minggu 2.44 m3

Melihat tabel abk 7-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga Pekerja = 7.05 x Tukang batu = 0.275 x Tukang Kayu = 1.65 x Tukang Besi = 2.1 x Kepala Tukang = 0.403 x Mandor = 0.353 x Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Kerikil Beton Kayu Klas II Balok Plywood 9 mm Dolken diameter 8 / 4rm

= = = = = = = = = = =

0.4 4 2 315 4.5 336 0.54 0.81 0.15 3.5 20

x x x x x x x x x x x

Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga Pekerja = 17.20 : Tukang batu = 0.67 : Tukang Kayu = 4.03 : Tukang Besi = 5.12 : Kepala Tukang = 0.98 : Mandor = 0.86 :

12

Pemasangan Pipa PVC tipe AW Ø ½" Volume Durasi Volume/Minggu

= = =

2.44 2.44 2.44 2.44 2.44 2.44

50.00 m1 1 minggu 50.00 m1

2.44 2.44 2.44 2.44 2.44 2.44 2.44 2.44 2.44 2.44 2.44

6 6 6 6 6 6

= = = = = =

17.20 0.67 4.03 5.12 0.98 0.86

= = = = = = = = = = =

0.976 9.760 4.880 768.6 10.980 819.84 1.318 1.976 0.366 8.540 48.800

= = = = = =

2.87 0.112 0.671 0.854 0.164 0.14355333

Melihat tabel abk 10-14 Jumlah Kebutuhan Tenaga dan Bahan dalam 1 Minggu Tenaga Pekerja = 0.81 x Tukang Batu = 0.140 x Kepala Tukang = 2.80 x Mandor = 16.0 x

50.00 50.00 50.00 50.00

= = = =

40.50 7.00 140.00 800.00

50.00 50.00

= =

60 17.5

6 6 6 6

= = = =

6.75

Bahan Pipa PVC Ø ½" Perlengkapan 35% x pipa

= =

1.2 0.35

x x

Jumlah Kebutuhan Tenaga dan Bahan dalam 1 hari Tenaga = 40.50 : Pekerja = 7.00 : Tukang Batu = 140.00 : Kepala Tukang = 800.00 : Mandor

1.17 23.33 133.33

orang orang orang orang

kg

= = = =

2 1 1 1

orang orang orang orang

Bata Camp. 1SP : 6PP

orang orang orang orang

kg m3

= = = =

orang orang orang

7 3 1 1

orang orang orang orang

orang

kg m3

= = = =

2 1 1 1

orang orang orang orang

orang orang orang orang

kg m3

= = = =

orang orang orang orang

=

18.99 sak

9 5 1 1

orang orang orang orang

m3 kg kg

= = = =

1 1 1 1

orang orang orang orang

orang orang orang orang

Ltr Ltr Lbr

= = = =

1 1 1 1

orang orang orang orang

Bata Camp. 1SP : 6PP

orang orang orang

orang

Buah Kg m3

= = = =

7 3 1 1

orang orang orang orang

orang orang orang orang

kg kg

= = = =

orang orang orang orang

m3 kg

5 orang 3 orang 1 orang 1 orang

kg

= = = =

1 1 1 1

orang orang orang orang

orang orang orang orang orang orang

m3 Kg Ltr kg kg Kg m3 m3 m3 Lbr Btg

= = = = = =

3 1 1 1 1 1

orang orang orang orang orang orang

orang orang orang orang

m' Ls

orang orang orang orang

Tabel Kebutuhan Tenaga Kerja di Minggu ke 11 dengan 6 hari kerja No. 1 2 3 4 5 6

Tenaga Kerja

Jumlah

Pekerja 39 Tukang Batu 13.20 Tukang Kayu 1.55 Tukang Besi 0.85 Kepala Tukang 1.57 Mandor 1.57 Total ( 1 Hari Kerja )

Anggaran Tenaga Kerja Rp2,280,000 Rp1,176,000 Rp168,000 Rp78,000 Rp174,000 Rp156,000 Rp4,032,000

Jumlah Pekerja 40 orang 14 orang 2 orang 1 orang 2 orang 2 orang 61

Rp24,192,000

Maka total anggaran untuk tenaga kerja selama 1 minggu =

Tabel Kebutuhan Bahan Bangunan di Minggu ke 11 No.

Bahan

1

Portland Cement ( PC )

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Bata Merah 5 x 11 x 22 Pasir Pasang Pasir Beton Kerikil Beton Kayu Klas I (Jati) , Balok Kayu Klas III (Terentang) Pipa PVC Ø ½" Dolken diameter 8 / 4rm Plywood 9 mm Minyak Bekisting Besi Beton Polos Kawat Beton Politur Lem Kayu Paku Biasa 2" - 5 " Air kerja dan listrik

Anggaran Untuk Bahan Bangunan

Jumlah kg / sak buah m3 m3 kg m3 kg 60 m' 48.80 btg 8.540 lbr 4.88 ltr 768.60 kg 10.98 kg 4.35 ltr 0.42 kg 10.28 kg 0.006 ls

4,797.79 120 18,900 18.495 1.318 1.976 0.461 0.98

Total

Total Anggaran yang dikeluarkan di minggu ke 11

Rp

6,360,000

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

9,828,000 3,883,950 368,928 553,392 9,220,992 172,752 405,000 878,400 999,180 47,336 7,686,000 164,700 169,491 8,173 143,975 6,202 40,896,471

Rp Rp Rp

24,192,000 40,896,471 65,088,471

Anggaran Biaya Minggu ke-11

= = =

bobot x 7.62% x Rp 65,088,471

6 hari kerja Anggaran Tenaga Kerja Rp2,280,000 Rp1,176,000 Rp168,000 Rp78,000 Rp174,000 Rp156,000 Rp4,032,000 Rp24,192,000

Anggaran Untuk Bahan Bangunan Rp

6,360,000

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

9,828,000 3,883,950 368,928 553,392 9,220,992 172,752 405,000 878,400 999,180 47,336 7,686,000 164,700 169,491 8,173 143,975 6,202 40,896,471

Rp Rp Rp

24,192,000 40,896,471 65,088,471

Anggaran Biaya (+PPN) Rp887,750,000

KE

P

NO

JENIS PEKERJAAN

VOL.

HARGA SATUAN

SAT.

BOBOT (%)

HARGA

A. LANTAI 1

I

PEKERJAAN PERSIAPAN

1

Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

2

Pengukuran dan Pemasangan Bouwplank

3

Pembuatan Kantor Sementara dg Lantai Plesteran

9.000 m2 Rp

4

Pembuatan Gudang Semen dan Alat-alat

1.000

5

Membersihkan Lapangan dan Perataan

6 7 8

II

PEKERJAAN TANAH

1

Menggali Tanah Biasa Sedalam 1 m

2

Pengurugan Kembali

3

Menggali Tanah Biasa Sedalam 2 m

4

Pengurugan Kembali

5

Urugan Pasir Bawah Pondasi

6

Urugan Pasir Bawah Lantai lt 1

III

PEKERJAAN PONDASI

1

Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP

2

Pemasang Batu Kosong/Anstamping

IV

PEKERJAAN DINDING

1

1.000

ls

Rp

70.000 m'

Rp

ls

200.000 m2

Rp Rp

Air kerja dan listrik

1.000

ls

Rp

Papan Nama Proyek

1.000

ls

Administrasi dan Dokumentasi

1.000

ls

10,000,000 Rp 136,004 Rp

10,000,000

1,810,859 Rp 1,702,008 Rp

16,297,727

10,560

9,520,280 1,702,008 Rp1,198,560 1,000,000

Rp

1,000,000 Rp 300,000 Rp

Rp

1,500,000 Rp

1,500,000

122.097 m3 40.699 m3

Rp

49,170 Rp 49,170 Rp

6,003,509

44.064 m3 14.688 m3

Rp

60,291 Rp 60,291 Rp

2,656,663

6.750 m3 11.355 m3

Rp

191,268 Rp 191,268 Rp

1,291,059

42.590 m3 18.360 m3

Rp

686,890 Rp 415,157 Rp

29,254,624

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP

20.250 m2

Rp

1,059,853

2

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP

280.000 m2

Rp

52,338 Rp 48,236 Rp

V

PEKERJAAN PLESTERAN

1

Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm

Rp

2

Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm

27.000 m2 344.000 m2

3

Pemasangan Acian

371.000 m2

VI

PEKERJAAN KUSEN KAYU

1

Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I

2

Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II

VII

Rp Rp Rp

Rp

300,000

2,001,170 885,554 2,171,848

7,622,273

13,506,034

Rp

52,338 Rp 48,236 Rp

16,593,128

Rp

28,457 Rp

10,557,547

0.291 m3 Rp 16.360 m3 Rp

26,851,000 Rp 708,373 Rp

7,814,285 11,588,974

0.450 m3 Rp 13.060 m3 Rp 8.127 m3 Rp

866,589 Rp

389,965

4,659,540 Rp

60,851,722

1,413,137

100.000

1.240 1.181 2.022 0.211 0.149 0.124 0.037 0.186 0.745 0.248 0.330 0.110 0.160 0.269 3.629 0.946 0.131 1.675 0.175 2.058 1.310 0.969 1.438

PEKERJAAN BETON

1

Membuat Lantai Kerja Beton Mutu K(100)

2

Membuat Pelat Lantai K-250 (200 kg Besi + Bekisting)

3

Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)

4

Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)

5

Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)

6

Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)

7

Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)

3,769,209 Rp

30,632,836

4.725 m3 Rp 9.805 m3 Rp

4,608,610 Rp

21,775,680

8,040,786 Rp

78,839,902

3.695 m3 Rp 1.643 m3 Rp

6,321,926 Rp

23,359,515

5,815,112 Rp

9,551,321

51.100 m2 Rp 113.000 m' Rp

95,994 Rp 20,485 Rp

4,905,307

2.000 Unit Rp 1.000 Unit Rp

1,779,874 Rp 666,259 Rp

3,559,747

31,053 Rp 75,000 Rp

62,106

0.048 80.000 7.549 3.800 2.701 9.780 2.898 1.185

VIII PEKERJAAN LANGIT-LANGIT 1

Langit-langit Gypsum Board & Rangka Allumunium (Concealed)

2

List Gypsum

IX

PEKERJAAN SANITASI

1

Memasang Closet Duduk / Mono Blok

2

Memasang Wastafel + Kran

3

Pemasangan Floor Drain

4

Memasang Soap Holder

5

Memasang Paper Holder

6

Memasang Shower dan Kran

7

Memasang Kran Air

8

Memasang Pompa Air (Sanyo)

2.000 bh 2.000 bh

Rp

1.000 bh 1.000 bh

Rp

Rp

2,314,805

666,259 150,000

Rp

80,000 Rp 200,000 Rp

2.000 bh Rp 1.000 Unit Rp

72,655 Rp 995,000 Rp

145,310

2,203,942

80,000 200,000 995,000

0.608 0.287 0.442 0.083 0.008 0.019 0.010 0.025 0.018 0.123

X

PEKERJAAN PLUMBING

1

Pemasangan Pipa PVC tipe AW Ø ½"

50.000

m'

Rp

2

Pemasangan Pipa PVC tipe AW Ø 4"

50.000

m'

Rp

44,079 Rp 44,079 Rp

3

Septictank + peresapan

1.000

Unit Rp

1,200,000 Rp

1,200,000

0.273 0.273 0.149

XI

PEKERJAAN BESI DAN ALUMUNIUM

1

Memasang Railling Tangga

XII

2,203,942

225.000 m'

Rp

29,758 Rp

6,695,494

0.831

4.000 bh 44.000 bh

Rp

176,152 Rp 9,000 Rp

704,606

0.087 0.049

PEKERJAAN KUNCI DAN KACA

1

Memasang Kunci Tanam

2

Memasang Engsel Pintu dan Jendela

Rp

396,000

60.000

3

Pasang Kait Angin lt1

4

Pasang Grendel

5

Pasang Pull Handle

6

Pasang Handle Biasa

7

Pasang Kaca tebal 5 mm lt1

XIII

PEKERJAAN PENUTUP LANTAI DAN DINDING

1

Pemasangan lantai Ubin Granito Uk. 40 x 40 cm

2

Pemasangan Lantai Keramik 20 x 20 cm

3

Pemasangan Dinding Keramik 20 x 25cm

4

Pemasangan dinding marmer 20x40

1.000 bh 27.000 bh

Rp

30,672 Rp 3,000 Rp

30,672

6.000 bh 2.000 bh

Rp

522,000

Rp

87,000 Rp 90,000 Rp

32.021 m2 Rp

90,110 Rp

2,885,424

100.500 m2 Rp 7.500 m2 Rp

347,075 Rp 57,815 Rp

34,881,068

24.000 m2 Rp 15.050 m2 Rp

200,654 Rp 350,000 Rp

4,815,703

16.651 m2 Rp 371.000 m2 Rp

40,814 Rp 17,286 Rp

679,602 6,412,924

51.100 m2 Rp

17,286 Rp

883,290

3.000 bh 15.000 bh

Rp

34,000 Rp 98,000 Rp

102,000

1.000 bh 7.000 bh

Rp Rp

Rp

81,000 180,000

433,615 5,267,500

0.004 0.010 60.000 0.065 0.022 0.358 4.327 0.054 0.597 0.653

XIV PEKERJAAN PENGECATAN 1

Pelaburan Bidang Kayu dg Politur

2

Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar

3

Pengecatan Plafond

XV

0.084 0.796 0.110

PEKERJAAN INSTALASI LISTRIK

1

Lampu Spiral Kuning ( Teras )

2

Lampu LED ( Dipasang Dalam Plafond )

3

Saklar Tunggal

4

Saklar Ganda

5

Stop Kontak

6

Instalasi Titik Lampu

4.000 bh 12.000 bh

7

Kabel NYA

Rp

13,500 Rp 13,500 Rp

162,000

50.000 m1 Rp

3,700 Rp

185,000

0.013 0.182 0.001 0.014 0.007 0.020 0.023

Rp Rp

10,000 Rp 16,000 Rp

1,470,000 10,000 112,000 54,000

B. LANTAI 2 XVI PEKERJAAN TANAH 1

Urugan pasir bawah lantai 2

10.883 m3

Rp

191,268 Rp

2,081,570

0.258

1,059,853

0.131 1.556

XVII PEKERJAAN DINDING 1

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP

20.250 m2

Rp

2

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP

260.000 m2

Rp

52,338 Rp 48,236 Rp 48,236 Rp 52,338 Rp

10,258,326

28,457 Rp

11,638,913

Rp

26,851,000 Rp

22,041,234

12,541,317

XVIII PEKERJAAN PLESTERAN 1

Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm

2

Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm

27.000 m2 Rp 196.000 m2 Rp

3

Pemasangan Acian

409.000 m2 Rp

XIX

PEKERJAAN KAYU

1

Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I

2

Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II

3

Pemasangan konstruksi Gording, Kayu Klas II

4

Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Klas I

5

Pemasangan Rangka Atap Genteng Beton, Kayu Klas II

6

Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II

XX

Rp

708,373 Rp

12,807,375

2.880 m1 0.877 m3

Rp

69,245 Rp

199,427

Rp

29,190,920 Rp

25,613,281

169.000 m2 36.900 m1

Rp

183,986 Rp

31,093,634

Rp

119,823 Rp

4,421,469

4.880 m3 Rp 2.160 m3 Rp

8,040,786 Rp

39,239,033

6,321,926 Rp

13,655,359

Rp

93,291 Rp

3,209,210

Rp

104,606 Rp

17,678,346

3.500 m1 83.070 m2

Rp

106,159 Rp

371,556

Rp

24,083 Rp

2,000,608

51.350 m2 122.800 m1

Rp

95,994 Rp

4,929,306

Rp

20,485 Rp

2,515,558

2.000 Unit Rp 2.000 bh Rp

1,779,874 Rp 31,053 Rp

3,559,747 160,000

0.162 1.273 1.444 40.000 2.734 1.589 0.025 3.177 3.857 0.548

PEKERJAAN BETON

1

Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)

2

Membuat Ring Balok Beton Bertulang

XXI

0.821 m3 18.080 m3

1,302,368

4.868 1.694

PEKERJAAN PENUTUP ATAP

1

Pemasangan Bubugan Genteng Beton

2

Pemasangan Atap Genteng Beton

3

Pemasangan Nok Genteng Beton

4

Pasang Allumunium Foil / Sisalation

34.400 m1 169.000 m2

0.398 2.193 0.046 0.248

XXII PEKERJAAN LANGIT-LANGIT 1

Langit-langit Gypsum Board & Rangka Allumunium (Concealed)

2

List Gypsum

0.611 0.312

XXIII PEKERJAAN SANITASI 1

Memasang Closet Duduk / Mono Blok

2

Pemasangan Floor Drain

3

Memasang Soap Holder

4

Memasang Shower dan Kran

62,106

2.000 bh 2.000 bh

Rp Rp

80,000 Rp 200,000 Rp

50.000 m' 60.000 m'

Rp

44,079 Rp

2,203,942

Rp

44,079 Rp

2,644,730

1.000 Unit Rp

1,600,000 Rp

1,600,000

400,000

0.442 0.008 0.020 0.050

XXIV PEKERJAAN PLUMBING 1

Pemasangan Pipa PVC tipe AW Ø ½"

2

Pemasangan Pipa PVC tipe AW Ø 4"

3

Memasang Roof Tank 1000 L

0.273 0.328 0.198

XXV PEKERJAAN BESI DAN ALUMUNIUM 1

Pemasangan Ralling Balkon 5 x 5

2

Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm

10.000 m' 27.200 m'

Rp

112,641 Rp

1,126,410

Rp

172,717 Rp

4,697,889

4.000 bh 27.000 bh

Rp

176,152 Rp

704,606

Rp

9,000 Rp

243,000

13.000 bh 2.000 bh

Rp

3,000 Rp

39,000

Rp

87,000 Rp

174,000

0.140 20.000 0.583

XXVI PEKERJAAN KUNCI DAN KACA 1

Memasang Kunci Tanam

2

Memasang Engsel Pintu dan Jendela

3

Pasang Grendel

4

Pasang Pull Handle

0.087 0.030 0.005 0.022

5

Pasang Handle Biasa

6

Kaca tebal 3 mm

5.000 bh 19.686 m2

Rp

90,000 Rp

450,000

Rp

90,110 Rp

1,773,912

76.500 m2 7.500 m2

Rp

347,075 Rp

26,551,260

Rp

57,815 Rp

433,615

24.000 m2 22.000 m2

Rp

200,654 Rp

4,815,703

Rp

350,000 Rp

7,700,000

18.901 m2 409.000 m2

Rp

40,814 Rp

771,428

Rp

17,286 Rp

7,069,774

51.350 m2

Rp

17,286 Rp

887,611

10.000 bh 1.000 bh

Rp

34,000 Rp

340,000

Rp

98,000 Rp

98,000

3.000 bh 4.000 bh

Rp

10,000 Rp

30,000

Rp

16,000 Rp

64,000

Rp

13,500 Rp

54,000

0.056 0.220

XXVII PEKERJAAN PENUTUP LANTAI DAN DINDING LT2 1

Pemasangan lantai Ubin Granito Uk. 40 x 40 cm

2

Pemasangan Lantai Keramik 20 x 20 cm

3

Pemasangan Dinding Keramik 20 x 25cm

4

Pemasangan dinding marmer 20x40

3.294 0.054 0.597 0.955

XXVIII PEKERJAAN PENGECATAN LT2 1

Pelaburan Bidang Kayu dg Politur

2

Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar

3

Pengecatan Plafond

0.096 0.877 0.110

XXIX PEKERJAAN INSTALASI LISTRIK LT2 1

Lampu LED ( Dipasang Dalam Plafond )

2

Lampu spiral kuning ( teras )

3

Saklar Tunggal

4

Saklar Ganda

5

Stop Kontak

6

Instalasi Titik Lampu

4.000 bh 11.000 bh

Rp

13,500 Rp

148,500

7

Kabel NYA

50.000 m'

Rp

3,700 Rp

185,000

2.000

ls

Rp

250,000 Rp

500,000

1.000

ls

Rp

1,000,000 Rp

1,000,000

1.000

ls

Rp

50,000,000 Rp

50,000,000

0.042 0.012 0.004 0.008 0.007 0.018 0.023

XXX PEKERJAAN LAIN-LAIN 1

Penangkal Petir

2

Penyambungan daya ke PLN 2200 VA

3

Landscape

PROSENTASE JUMLAH KOMULATIF

Rp 806,135,461.41

0.062 0.124 6.202 1000.000 1

TIME SCHEDULE KEGIATAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT PEKERJAAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT Lokasi : Jalan Estetika Raya No.1 Tembalang, Semarang DURASI minggu minggu 1 100.000

1 2 3 2 1 20 1 20 2 1 2 1 1 1 2 1

BULAN 1 minggu 2 minggu 3

minggu 4

minggu 5

BULAN 2 minggu 6 minggu 7

minggu 8

minggu 9

BULAN 3 minggu 10 minggu 11

1.240

0.006

0.590 0.674 0.106 0.149 0.006

0.009

0.009

0.590 0.674 0.106

0.674

0.006 0.037 0.009

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.009

0.009

0.009

0.009

0.009

0.009

0.009

0.009

0.372

0.372 0.248

0.165

0.165 0.110

0.160 0.269 1.814

1.814

0.946

1 2

0.131 0.838

1 2 2

0.175 1.029

2 3 80.000

1 2 2 2 2 2 1

0.485 0.479

0.485

0.479

0.048 1.900

1.900 1.351

1.351 4.890

3.774

3.774

1.449

1.449

4.890 1.185

2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

60.000

0.838

0.123 0.273 0.273 0.149

60.000

1 1 1 1 1 2 1 1 2 2 2 2

0.042

0.042

1 1 1 1 1 1 1

1 1 2

40.000

0.131 0.778

1 2 2 3 3 1 3 2 1

0.778

0.636

0.530 1.059

2 2

0.911 0.530

0.911

2.434

2.434

1.059

1 2 1 1 2 1 1 1 1 1 1 1 1

20.000

2 1 1 1 1 1

0.273 0.328

1 1 2 1 1 2 2 3 1

0.048

1 1 1 1 1 1 1 1 1 5 0.000 1

1.256 1.256 2

1.534 2.790 3

3.066 5.856 4

4.989 10.8455

5.081 15.926 6

6.256 22.182 7

6.288 28.470

7.147 8 35.617

7.312 9 42.929

7.544 50.474 10

7.617 58.091 11

12

13

N3 minggu 12

minggu 13

BULAN 4 minggu 14 minggu 15

minggu 16

minggu 17

BULAN 5 minggu 18 minggu 19

minggu 20

BOBOT PRESENTASE

100%

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.009

0.009

0.009

0.009

0.009

0.009

0.009

0.009

0.009

1.029 0.655

0.655

0.479

0.304 0.287

0.304

0.442 0.083 0.008 0.019 0.010 0.025 0.018

0.831 0.087 0.049

Row 189

0.004 0.010 0.065 0.022 0.358

Row 189

2.163 0.054 0.597

2.163

0.327

0.398 0.055

0.327

50%

0.398 0.055

0.013 0.182 0.001 0.014 0.007 0.020 0.023

0.258

0.162 0.636 0.722

0.722

0.911 0.530 0.025 1.059 1.929

1.929 0.548

0.847

0.847

1.096

0.398 1.096

0.046 0.248 0.306

25%

0.306 0.312

0.442 0.008 0.020 0.050

0.198 0.070

0.087 0.030 0.005 0.022

0.070 0.583

0.056 0.220 1.647 0.054 0.597

1.647

0.478 0.048 0.292 0.110

0.292

0.478

0.292

0.042 0.012 0.004 0.008 0.007 0.018 0.023 0.062

11

7.196 65.287 12

6.661 71.948 13

6.493 78.441 14

5.935 84.37715

1.240 1.240 1.240 5.038 4.546 3.077 89.414 16 93.960 17 97.037

1.240 1.583 18 98.620

0.124 1.240 1.380 100.000 19

0% 20

DAF TAR HAR GA SAT UAN PE K E R JAAN PEKERJAAN : PEMBANGUNAN RUMAH DAN TOKO BERTINGKAT Lokasi : Jalan Estetika Raya No.1 Tembalang, Semarang

URAIAN PEKERJAAN

NO.

KODE

I

A. 2.2.1

HARGA SATUAN PEKERJAAN PERSIAPAN

1

A.2.2.1.2

Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

2

A.2.2.1.4

Pengukuran dan Pemasangan Bouwplank

3

A.2.2.1.5

Pembuatan Kantor Sementara dg Lantai Plesteran

4

A.2.2.1.7

Pembuatan Gudang Semen dan Peralatan

5

A.2.2.1.9

Membersihkan Lapangan dan Perataan

6

A.2.2.1.10 Pembuatan Steger/Perancah dari Bambu

7

A.2.2.1.11 Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm

8

A.2.2.1.13 Bongkaran Beton Bertulang

9

A.2.2.1.14 Bongkaran Dinding Tembok Bata Merah

II

A.2.3.1

1

A.2.3.1.1

Menggali Tanah Biasa Sedalam 1 m

2

A.2.3.1.2

Menggali Tanah Biasa Sedalam 2 m

3

A.2.3.1.3

Menggali Tanah Biasa Sedalam 3 m

4

A.2.3.1.4

Menggali Tanah Keras Sedalam 1 m

5

A.2.3.1.5

Menggali Tanah Cadas Sedalam 1 m

6

A.2.3.1.6

Menggali Tanah Lumpur Sedalam 1 m

7

A.2.3.1.7

Mengerjakan Striping Tebing Setinggi 1 m

8

A.2.3.1.8

MembuangTanah sejauh 30 m'

9

A.2.3.1.9

Pengurugan Kembali

10

A.2.3.1.10 Pemadatan Tanah (per 20 cm)

11

A.2.3.1.11 Urugan Pasir

12

A.2.3.1.12 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL

13

A.2.3.1.13 Pemasangan Lapisan Ijuk tebal 10 cm unt Bidang Resapan

14

A.2.3.1.14 Mengurug Sirtu Padat

414275883.xlsx

HARGA SATUAN PEKERJAAN TANAH

157/432

sat.pekerjaan

URAIAN PEKERJAAN

NO.

KODE

III

A.3.2.1.

HARGA SATUAN PEKERJAAN PONDASI

1

A.3.2.1.1

Pemasangan Pondasi Batu Belah 1SP : 3 PP

2

A.3.2.1.2

Pemasangan Pondasi Batu Belah 1SP : 4 PP

3

A.3.2.1.3

Pemasangan Pondasi Batu Belah 1SP : 5 PP

4

A.3.2.1.4

Pemasangan Pondasi Batu Belah 1SP : 6 PP

5

A.3.2.1.5

Pemasangan Pondasi Batu Belah 1SP : 8 PP

6

A.3.2.1.6

Pemasangan Pondasi Batu Belah 1SP : 1KP : 2PP

7

A.3.2.1.7

Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP

8

A.3.2.1.8

Pemasangan Pondasi Batu Belah, ¼ SP : 1KP : 4 PP

9

A.3.2.1.9

Pemasang Batu Kosong/Anstamping

10

A.3.2.1.10 Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah

11

A.3.2.1.11 Pasang Pondasi Sumuran diameter 100 cm

IV

A.4.4.1

1

A.4.4.1.1

Pemasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1SP: 2PP

2

A.4.4.1.2

Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP

3

A.4.4.1.3

Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP

4

A.4.4.1.4

Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP

5

A.4.4.1.5

Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP

414275883.xlsx

HARGA SATUAN PEKERJAAN PASANGAN DINDING

158/432

sat.pekerjaan

URAIAN PEKERJAAN

NO.

KODE

6

A.4.4.1.6

Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3 KP :10PP

7

A.4.4.1.7

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 2PP

8

A.4.4.1.8

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP

9

A.4.4.1.9

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP

10

A.4.4.1.10 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP

11

A.4.4.1.11 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP

12

A.4.4.1.12 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP

13

A.4.4.1.13 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3KP : 10PP

14

A.4.4.1.14 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 1SM : 1PP

15

A.4.4.1.15 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1KP : 1SM : 2PP

16

A.4.4.1.20 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP

17

A.4.4.1.21 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP

18

A.4.4.1.22 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 2PP

19

A.4.4.1.23 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP

V

A.4.4.2

HARGA SATUAN PEKERJAAN PLESTERAN

1

A,4,4,2.1 Pemasangan Plesteran 1 Pc : 1 Pp Tebal 15 mm

2

A,4,4,2.2 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 15 mm

3

A,4,4,2.3 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm

4

A,4,4,2.4 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm

5

A,4,4,2.5 Pemasangan Plesteran 1 Pc : 5 Pp Tebal 15 mm

6

A,4,4,2.6 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm

7

A,4,4,2.7 Pemasangan Plesteran 1 Pc : 7 Pp Tebal 15 mm

8

A,4,4,2.8 Pemasangan Plesteran 1 Pc : 8 Pp Tebal 15 mm

9

A.4.4.2.9 Pemasangan Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm

10

A,4,4,2.10 Pemasangan Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm

11

A,4,4,2.11 Pemasangan Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15 mm

12

A,4,4,2.12 Pemasangan Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15 mm

13

A,4,4,2.13 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 20 mm

14

A,4,4,2.14 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm

414275883.xlsx

159/432

sat.pekerjaan

NO.

URAIAN PEKERJAAN

KODE

15

A,4,4,2.15 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 20 mm

16

A,4,4,2.16 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm

17

A,4,4,2.17 Pemasangan Plesteran 1Pc : 6Pp Tebal 20 mm

0

A,4,4,2.18 Pemasangan Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20 mm

0

A,4,4,2.19 Pemasangan Berapen 1 Pc : 5Pp Tebal 15 mm

0

A,4,4,2.20 Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm

0

A,4,4,2.23 Pemasangan Plesteran Ciprat 1Pc : 2 Pp

0

A,4,4,2.24 Pemasangan Finishing Siar Pasangan Dinding Bata Merah (=20 m')

0

A,4,4,2.25 Pemasangan Finishing Siar Pasangan Dinding Conblock ekspose (=8 m')

0

A,4,4,2.26 Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp

0

A,4,4,2.27 Pemasangan Acian

VI

A.4.6.1

1

A.4.6.1.1

Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I

2

A.4.6.1.2

Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas II atau III

3

A.4.6.1.3

Pembuatan & Pemasangan Pintu KlampStandard Kayu Klas II (Kayu Kamfer)

4

A.4.6.1.4

Pembuatan & Pemasangan Daun Pintu Klamp Sederhana Kayu Klas III

5

A.4.6.1.5

Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II

6

A.4.6.1.6

Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Klas I atau II

7

A.4.6.1.7

Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Klas I atau II (jati)

414275883.xlsx

HARGA SATUAN PEKERJAAN

K A Y U

160/432

sat.pekerjaan

URAIAN PEKERJAAN

NO.

KODE

8

A.4.6.1.8

Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm)

9

A.4.6.1.9

Pembuatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu klas I atau II

10

A.4.6.1.10 Pembuatan & Pemasangan Jalusi mati Kosen Kayu Klas I atau II

11

A.4.6.1.11 Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I

12

A.4.6.1.12 Pembuatan&Pemasangan Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II

13

A.4.6.1.13 Pembuatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter

14

A.4.6.1.14 Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Klas I

15

A.4.6.1.15 Pemasangan konstruksi Gording, Kayu Klas II

16

A.4.6.1.16 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II

17

A.4.6.1.17 Pemasangan Rangka Atap Genteng Beton, Kayu Klas II

18

A.4.6.1.18 Pemasangan Rangka Atap Sirap, Kayu Klas II

19

A.4.6.1.19 Pemasangan Rangka Langit-langit (50x1,00) m, kayu Klas II atau III

20

A.4.6.1.20 Pemasangan Rangka Langit-langit (60x60) cm, kayu Klas II atau III

21

A.4.6.1.21 Pemasangan Listplank Uk. (3x20)cm Kayu klas I atau II

22

A.4.6.1.22 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II

23

A.4.6.1.23 Pemasangan Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III

24

A.4.6.1.24 Pemasangan Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II

25

A.4.6.1.25 Pemasangan Dinding Pemisah Plywood Rangkap Rangka Kayu Klas II

26

A.4.6.1.26 Pemasangan Dinding Lambriziring dari Papan klas I

27

A.4.6.1.27 Pemasangan Dinding Lambriziring dari Plywood ukuran (120x240) cm

28

A.4.6.1.28 Pemasangan Dinding Bilik, Rangka Kayu Klas III atau IV

VII

A.4.1.1

1

A.4.1.1.1

Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87

2

A.4.1.1.2

Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78

3

A.4.1.1.3

Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72

4

A.4.1.1.4

Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87

5

A.4.1.1.5

Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66

6

A.4.1.1.6

Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61

7

A.4.1.1.7

Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58

414275883.xlsx

HARGA SATUAN PEKERJAAN

BETON

161/432

sat.pekerjaan

URAIAN PEKERJAAN

NO.

KODE

8

A.4.1.1.8

Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56

9

A.4.1.1.9

Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53

10

A.4.1.1.10 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52

11

A.4.1.1.11 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49

12

A.4.1.1.12 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48

13

A.4.1.1.17 Pembesian dg Besi Polos atau Besi Ulir

14

A.4.1.1.18 Kabel Presstresed Polos/strand

15

A.4.1.1.19 Jaring Kawat baja/Wire Mesh

16

A.4.1.1.20 Memasang Bekisting untuk Pondasi

17

A.4.1.1.21 Memasang Bekisting untuk Sloof

18

A.4.1.1.22 Memasang Bekisting untuk Kolom

19

A.4.1.1.23 Memasang Bekisting untuk Balok

20

A.4.1.1.24 Memasang Bekisting untuk Lantai

21

A.4.1.1.25 Memasang Bekisting untuk Dinding

22

A.4.1.1.26 Memasang Bekisting untuk Tangga

23

A.4.1.1.27 Memasang Jembatan Cor

24

A.4.1.1.28 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)

25

A.4.1.1.29 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)

26

A.4.1.1.30 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)

414275883.xlsx

162/432

sat.pekerjaan

NO.

URAIAN PEKERJAAN

KODE

27

A.4.1.1.31 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)

28

A.4.1.1.32 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)

29

A.4.1.1.33 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)

30

A.4.1.1.34 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)

31

A.4.1.1.35 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm

32

A.4.1.1.36 Membuat Ring Balok Beton Bertulang (10 x 15) cm

VIII

A.4.5.2

1

A.4.5.2.1

Pemasangan Atap Genteng Plentong Kecil

2

A.4.5.2.2

Pemasangan Atap Genteng Kodok / Glasur

3

A.4.5.2.3

Pemasangan Atap Genteng Plentong Super / Besar

4

A.4.5.2.4

Pemasangan Genteng Bubung Plentong

5

A.4.5.2.5

Pemasangan Genteng Bubung Kodok / Glasur

6

A.4.5.2.6

Pemasangan Bubugan Genteng Beton

7

A.4.5.2.9

Pemasangan Atap Asbes Gelombang (2,25x0,92 m) x 5 mm

8

A.4.5.2.10 Pemasangan Atap Asbes Gelombang (2,00x0,92 m) x 5 mm

9

A.4.5.2.12 Pemasangan Atap Asbes Gelombang (3,00x1,05 m) x 4 mm

10

A.4.5.2.15 Pemasangan Atap Asbes Gelombang (2,10x1,05 m) x 4 mm

11

A.4.5.2.30 Pemasangan Atap Genteng Beton

12

A.4.5.2.32 Pemasangan Atap Genteng Metal

13

A.4.5.2.33 Pemasangan Atap Sirap

14

A.4.5.2.34 Pemasangan Nok Genteng Beton

15 A.4.5.2.36

HARGA SATUAN PEKERJAAN PENUTUP ATAP

Pemasangan Nok Genteng Metal

16

A.4.5.2.37 Pemasangan Nok Sirap

17

A.4.5.2.38 Pemasangan Atap Seng Gelombang

18

A.4.5.2.39 Pemasangan Atap Nok Seng

19

A.4.5.2.42 Pasang Allumunium Foil / Sisalation

IX

A.4.5.1

1

A.4.5.1.1

414275883.xlsx

HARGA SATUAN PEKERJAAN LANGIT-LANGIT Pemasangan Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm

163/432

sat.pekerjaan

URAIAN PEKERJAAN

NO.

KODE

2

A.4.5.1.2

Pemasangan Langit-langit Akustik Ukuran (30x30) cm

3

A.4.5.1.3

Pemasangan Langit-langit Akustik Ukuran (30x60) cm

4

A.4.5.1.4

Pemasangan Langit-langit Akustik Ukuran (60x120) cm

5

A.4.5.1.5

Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm

6

A.4.5.1.6

Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm

7

A.4.5.1.7

Memasang Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm

8

A.4.5.1.9

Memasang Langit-langit Akuatik Uk (60x120) cm & Rangka Allumunium

9

A.4.5.1.10 List Langit-Langit Kayu Profil

X

A.5.1.1

1

A.5.1.1.1

Memasang Closet Duduk / Mono Blok

2

A.5.1.1.2

Memasang Closet Jongkok Porselen

3

A.5.1.1.4

Memasang Urinoir

4

A.5.1.1.5

Memasang Wastafel + Kran

5

A.5.1.1.6

Pemasangan Bathcuip porselen

6

A.5.1.1.7

Pemasangan Bak Fibreglass vol.1 m3

7

A.5.1.1.8

Memasang Bak Mandi Batu Bata Vol. 0,30 m3

8

A.5.1.1.12 Pemasangan Bak Cuci Piring Stainless stell

9

A.5.1.1.14 Pemasangan Floor Drain

10

A.5.1.1.15 Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm

414275883.xlsx

HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

164/432

sat.pekerjaan

NO.

URAIAN PEKERJAAN

KODE

11

A.5.1.1.16 Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm

12

A.5.1.1.17 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm

13

A.5.1.1.18 Pemasangan Pipa Galvanis Ø ½"

14

A.5.1.1.19 Pemasangan Kran Ø ½" atau Ø ¾"

15

A.5.1.1.20 Pemasangan Pipa Galvanis Ø ¾"

16

A.5.1.1.21 Pemasangan Pipa Galvanis Ø 1"

17

A.5.1.1.22 Pemasangan Pipa Galvanis Ø 1½ "

18

A.5.1.1.23 Pemasangan Pipa Galvanis Ø 3"

19

A.5.1.1.24 Pemasangan Pipa Galvanis Ø 4"

20

A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½"

21

A.5.1.1.26 Pemasangan Pipa PVC tipe AW Ø ¾"

22

A.5.1.1.27 Pemasangan Pipa PVC tipe AW Ø 1"

23

A.5.1.1.28 Pemasangan Pipa PVC tipe AW Ø 1½"

24

A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø 2"

25

A.5.1.1.31 Pemasangan Pipa PVC tipe AW Ø 3"

26

A.5.1.1.32 Pemasangan Pipa PVC tipe AW Ø 4"

27

A.5.1.1.33 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm

28

A.5.1.1.34 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm

29

A.5.1.1.35 Pemasangan Pipa Beton Ø 20 cm

30

A.5.1.1.36 Pemasangan Pipa Beton Ø 100 cm

XI

A.4.2.1

1

A.4.2.1.1

Pemasangan Besi Profil

2

A.4.2.1.2

Pemasangan Rangka Kuda-kuda Baja IWF

3

A.4.2.1.3

Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja)

4

A.4.2.1.4

Pembuatan Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku

5

A.4.2.1.5

Pengerjaan Pengelasan dengan Las Listrik

6

A.4.2.1.7

Pemasangan Pintu Rolling Door Besi

7

A.4.2.1.8

Pemasangan Pintu Lipat (Folding Door)

8

A.4.2.1.9

Pemasangan Sunscreen Allumunium

414275883.xlsx

HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM

165/432

sat.pekerjaan

NO.

URAIAN PEKERJAAN

KODE

9

A.4.2.1.10 Pemasangan Rolling Door Allumunium

10

A.4.2.1.11 Pemasangan Kusen Pintu Allumunium

11

A.4.2.1.12 Pemasangan Pintu Allumunium Strip Lebar 8 cm

12

A.4.2.1.13 Pemasangan Pintu Kaca Rangka Allumunium

13

A.4.2.1.14 Pemasangan Venetions Blinds & Vertical Blinds

14

A.4.2.1.15 Pemasangan Terali Besi Strip (2x3) cm

15

A.4.2.1.16 Pemasangan Kawat Nyamuk

16

A.4.2.1.17 Pemasangan Jendela Nako & Tralis

17

A.4.2.1.18 Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm

18

A.4.2.1.19 Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm

19

A.4.2.1.20 Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 60x120 cm dinding partisi

20

A.4.2.1.21 Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 60x60 cm dinding plafond

XII

A.4.6.2

1

A.4.6.2.2

Pemasangan Kunci Tanam Biasa

2

A.4.6.2.3

Pemasangan Kunci Kamar Mandi

3

A.4.6.2.4

Pemasangan Kunci Selinder

4

A.4.6.2.5

Pemasangan Engsel Pintu

5

A.4.6.2.6

Pemasangan Engsel Jendela Kupu-kupu

414275883.xlsx

HARGA SATUAN PEKERJAAN KUNCI dan KACA

166/432

sat.pekerjaan

URAIAN PEKERJAAN

NO.

KODE

6

A.4.6.2.7

Pemasangan Engsel Angin

7

A.4.6.2.9

Pemasangan Kait Angin

8

A.4.6.2.10 Pasang Door Closer

9

A.4.6.2.11 Pemasangan Kunci Selot

10

A.4.6.2.13 Pemasangan Door Stop

11

A.4.6.2.14 Pemasangan Rel Pintu Dorong

12

A.4.6.2.15 Pemasangan Kunci Lemari

13

A.4.6.2.16 Pemasangan Kaca tebal 3 mm

14

A.4.6.2.17 Pemasangan Kaca tebal 5 mm

15

A.4.6.2.18 Pemasangan Kaca Cermin tebal 5 mm

XIII

A.4.4.3

1

A.4.4.3.2

Pemasangan lantai Ubin PC Abu-abu Uk. 30 x 30 cm

2

A.4.4.3.3

Pemasangan lantai Ubin PC Abu-abu Uk. 20 x 20 cm

3

A.4.4.3.5

Pemasangan lantai Ubin PC Warna Uk. 30 x 30 cm

4

A.4.4.3.6

Pemasangan lantai Ubin PC Warna Uk. 20 x 20 cm

5

A.4.4.3.9

Pemasangan lantai Ubin Granito Uk. 40 x 40 cm

6

A.4.4.3.16 Pemasangan Ubin Plin Pc.Abu-abu Uk. 15 x 20 cm

7

A.4.4.3.19 Pemasangan Ubin Plin Pc.Warna Uk. 10 x 20 cm

8

A.4.4.3.32 Pemasangan Lantai Keramik 10x 20 cm

9

A.4.4.3.33 Pemasangan lantai Keramik Uk. 10 x 10 cm / 5 x 20 cm

10

A.4.4.3.34 Pemasangan Lantai Keramik 33 x 33 cm

11

A.4.4.3.35 Pemasangan Lantai Keramik 30 x 30 cm

12

A.4.4.3.36 Pemasangan Lantai Keramik 20 x 20 cm

13

A.4.4.3.37 Pemasangan Lantai Keramik uk.10 x 33 cm, untuk variasi / border

14

A.4.4.3.39 Pemasangan Plint Keramik Ukuran 10x20 cm

15

A.4.4.3.40 Pemasangan Plint Keramik Ukuran 10x10 cm

16

A.4.4.3.41 Pemasangan Plint Keramik Ukuran 5x20 cm

17

A.4.4.3.43 Pemasangan Lantai Marmer Ukuran 1.00x1.00 cm

18

A.4.4.3.44 Pemasangan Lantai Karpet

414275883.xlsx

HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING

167/432

sat.pekerjaan

NO.

URAIAN PEKERJAAN

KODE

19

A.4.4.3.46 Pemasangan Lantai Parquet Jati

20

A.4.4.3.48 Pemasangan Dinding Porselen 11 x 11 cm

21

A.4.4.3.49 Pemasangan Dinding Keramik 10x20 cm,

22

A.4.4.3.50 Pemasangan Dinding Keramik 20 x 25cm

23

A.4.4.3.53 Pemasangan Dinding Keramik 10x20 cm,

24

A.4.4.3.55 Pemasangan Dinding Marmer Ukuran 1.00x1.00 cm

25

A.4.4.3.58 Pemasangan Dinding Batu Paros / Batu Tempel Hitam

26

A.4.4.3.59 Pemasangan Lantai Vynil uk.30 x 30 cm

27

A.4.4.3.63 Pemasangan Plint Kayu Klas II Ukuran 2x10 cm

XIV

A.4.7.1

1

A.4.7.1.1

Pengikisan / pengerokan Permukaan Cat Tembok Lama

2

A.4.7.1.2

Pencucian Bidang Permukaan Tembok yang Pernah dicat

3

A.4.7.1.3

Pengerokan Karat Cat Lama permukaan Baja dg cara manual

4

A.4.7.1.4

Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)

5

A.4.7.1.5

Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup)

6

A.4.7.1.6

Pelaburan Bidang Kayu dg Teak Oil

7

A.4.7.1.7

Pelaburan Bidang Kayu dg Politur

414275883.xlsx

HARGA SATUAN PEKERJAAN PENGECATAN

168/432

sat.pekerjaan

URAIAN PEKERJAAN

NO.

KODE

8

A.4.7.1.8

Pelaburan Bidang Kayu dg Cat Residu & Ter

9

A.4.7.1.9

Pelaburan Bidang Kayu dg Vernis

10

A.4.7.1.10 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar

11

A.4.7.1.11 Pengecatan Tembok Lama (1lap.Plamir, 2lap Cat Penutup)

12

A.4.7.1.12 Pengecatan Tembok dengan Kalkarium

13

A.4.7.1.13 Pelaburan Tembok dengan Kapur Sirih

14

A.4.7.1.14 Pelaburan Tembok lama dengan Kapur Sirih (pemeliharaan)

15

A.4.7.1.15 Pemasangan Wallpaper

16

A.4.7.1.16 Pengecatan Permukaan Baja dg Meni Besi

17

A.4.7.1.17 Pengecatan Permukaan Baja dg Meni Besi & Perancah

414275883.xlsx

169/432

sat.pekerjaan

A SAT UAN PE K E R JAAN AN RUMAH DAN TOKO BERTINGKAT

aya No.1 Tembalang, Semarang

HARGA SATUAN PEKERJAAN SAT

m'

598,752.00

m'

136,004.00

m2

1,810,858.50

m2

1,702,008.00

m2

10,560.00

m2

286,316.80

bh

487,223.00

m3

893,184.60

m3

420,852.30

m3

49,170.00

m3

60,291.00

m3

71,583.60

m3

65,445.60

m3

99,198.00

m3

79,101.00

m2

3,564.00

m3

3,564.00

m3

414275883.xlsx

(Rp)

1/3 x Gal.tanah

m3

35,640.00

m3

191,268.00

m3

257,653.00

m2

63,492.00

m3

178,860.00

170/432

sat.pekerjaan

HARGA SATUAN PEKERJAAN SAT

414275883.xlsx

(Rp)

m3

852,549.50

m3

802,290.50

m3

767,442.50

m3

742,945.50

m3

709,362.50

m3

600,451.50

m3

686,889.50

m3

652,217.50

m3

415,156.50

m3

2,284,668.10

m3

791,975.80

m2

224,224.00

m2

210,982.20

m2

201,869.80

m2

197,441.20

m2

196,526.00

171/432

sat.pekerjaan

HARGA SATUAN PEKERJAAN SAT

414275883.xlsx

(Rp)

m2

185,282.68

m2

107,461.20

m2

101,071.52

m2

97,471.00

m2

95,210.28

m2

94,099.72

m2

91,608.00

m2

93,071.00

m2

83,342.60

m2

88,214.50

m2

195,137.36

m2

196,148.48

m2

246,730.00

m2

242,935.00

m2

62,282.48

m2

55,307.60

m2

52,338.40

m2

50,271.54

m2

49,153.76

m2

48,235.84

m2

47,748.76

m2

47,261.68

m2

48,863.76

m2

46,945.80

m2

42,857.10

m2

43,259.70

m2

73,992.07

m2

54,984.48

172/432

sat.pekerjaan

HARGA SATUAN PEKERJAAN SAT

414275883.xlsx

(Rp)

m2

67,200.32

m2

65,786.95

m2

64,486.05

m2

60,492.30

m2

31,548.26

m'

49,898.20

m2

38,142.72

m2

22,436.57

m2

10,742.60

m2

47,649.14

m2

28,457.00

m3

26,851,000.00

m3

11,518,100.00

m2

465,727.90

m2

465,727.90

m2

708,372.50

m2

505,395.00

m2

1,932,425.00

173/432

sat.pekerjaan

HARGA SATUAN PEKERJAAN SAT

414275883.xlsx

(Rp)

m2

553,817.00

m2

596,123.00

m2

1,729,002.00

m2

982,817.00

m2

639,285.90

m3

10,254,090.00

m3

29,190,920.00

m3

69,245.35

m2

156,266.00

m2

183,986.00

m2

131,155.20

m2

168,091.00

m2

173,349.00

m'

289,993.00

m'

119,823.00

m2

273,887.90

m2

348,335.90

m2

355,652.00

m2

395,917.50

m2

37,838.90

m2

120,458.14

m3

923,395.00

m3

960,619.00

m3

989,747.00

m3

866,588.80

m3

1,024,199.00

m3

1,057,155.00

m3

1,081,839.00

174/432

sat.pekerjaan

HARGA SATUAN PEKERJAAN SAT

414275883.xlsx

(Rp)

m3

1,098,207.00

m3

1,126,499.00

m3

1,135,211.00

m3

1,206,089.50

m3

1,217,573.50

10 kg

158,720.10

10 kg

125,640.90

10 kg

229,379.70

m2

155,034.00

m2

166,034.00

m2

348,782.50

m2

366,932.50

m2

427,982.50

m2

398,832.50

m2

326,249.00

m2

92,409.90

m3

3,769,209.40

m3

4,608,609.50

m3

8,040,785.50

175/432

sat.pekerjaan

HARGA SATUAN PEKERJAAN SAT

414275883.xlsx

(Rp)

m3

6,321,925.50

m3

5,786,280.50

m3

5,693,593.40

m3

5,815,111.50

m'

66,977.90

m'

92,801.50

m2

64,489.15

m2

130,537.00

m2

120,747.00

m'

114,505.60

m'

101,305.60

m'

104,605.60

m2

66,396.00

m2

60,472.50

m2

52,057.50

m2

53,344.50

m2

96,657.00

m2

82,775.00

m2

101,377.10

m'

106,158.80

m'

57,055.90

m'

46,978.80

m2

34,485.00

m'

26,253.70

m2

24,083.40

m2

28,876.10

176/432

sat.pekerjaan

HARGA SATUAN PEKERJAAN SAT

414275883.xlsx

(Rp)

m2

94,965.20

m2

103,796.00

m2

85,316.00

m2

43,345.50

m2

498,322.00

m2

39,838.70

m2

191,895.00

m1

14,188.90

Unit

1,779,873.70

Unit

518,364.00

Unit

685,036.00

Unit

666,259.00

Unit

1,071,437.40

Unit

1,024,705.00

Unit

1,283,947.90

buah

336,259.00

buah

31,053.00

bh

360,527.20

177/432

sat.pekerjaan

HARGA SATUAN PEKERJAAN SAT

414275883.xlsx

(Rp)

bh

542,701.50

bh

662,843.50

m'

33,918.87

bh

72,655.00

m'

37,613.03

m'

42,443.87

m'

65,338.53

m'

165,614.53

m'

270,756.20

m'

20,055.75

m'

22,613.25

m'

27,728.25

m'

31,291.33

m'

44,078.83

m'

76,021.18

m'

93,797.00

m'

84,634.00

m'

35,907.30

m'

92,681.82

m'

528,080.30

Kg

27,968.60

kg

26,582.60

kg

72,739.70

m2

845,725.10

cm

15,981.90

m2

550,118.80

m2

525,342.40

m2

455,435.20

178/432

sat.pekerjaan

HARGA SATUAN PEKERJAAN SAT

414275883.xlsx

(Rp)

m2

454,960.00

m'

112,640.99

m2

488,347.31

m2

455,793.80

m2

163,678.90

m2

338,220.56

m2

49,676.98

m2

64,204.80

m'

172,716.50

m'

65,036.40

m2

157,782.90

m2

191,178.90

Buah

213,213.00

Buah

144,006.50

Buah

212,206.50

Buah

25,679.50

Buah

16,203.00

179/432

sat.pekerjaan

HARGA SATUAN PEKERJAAN SAT

414275883.xlsx

(Rp)

Buah

43,756.90

Buah

30,672.40

Buah

384,334.50

Buah

39,333.80

Buah

340,866.90

Buah

296,201.40

Buah

32,671.54

m2

90,110.35

m2

103,420.35

m2

336,950.35

m2

95,297.50

m2

95,209.40

m2

124,293.50

m2

120,575.40

m2

347,075.30

m'

57,815.34

m'

34,087.24

m2

189,588.74

m2

194,043.74

m2

186,045.52

m2

185,698.50

m2

187,537.90

m2

372,238.90

m'

32,470.24

m'

78,774.74

m'

76,442.74

m2

665,514.74

m2

187,771.10

180/432

sat.pekerjaan

HARGA SATUAN PEKERJAAN SAT

414275883.xlsx

(Rp)

m2

338,662.50

m2

212,301.29

m2

208,607.30

m2

200,654.30

m2

208,607.30

m2

738,153.36

m2

223,195.50

m2

133,928.30

m'

40,900.20

m2

10,349.90

m2

10,349.90

m2

10,778.90

m2

39,652.80

m2

53,479.80

m2

30,851.70

m2

40,814.40

181/432

sat.pekerjaan

HARGA SATUAN PEKERJAAN SAT

414275883.xlsx

(Rp)

m2

7,862.80

m2

32,698.60

m2

17,285.51

m2

11,839.74

m2

6,768.74

m2

11,855.47

m2

5,976.85

m2

76,422.50

m2

22,867.90

m2

46,389.75

182/432

sat.pekerjaan

No.

SNI

I

A. 2.2.1

1

A.2.2.1.2

KODE

KOEF

URAIAN PAKERJAAN

SAT.

HARGA SATUAN PEKERJAAN PERSIAPAN 1

m' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m A

TENAGA

L.01

0.2

OH Pekerja

L.02

0.4

OH Tukang Kayu

L.03

0.02

OH Kepala Tukang

L.04

0.02

OH Mandor B

1.25

BAHAN

Btg Kayu Dolken diameter 8 - 10 / 400 cm

2.5

Kg Portalnd Semen

1.2

Lbr Seng Gelombang 3" - 5"

0.005

m3 Pasir Beton

0.009

m3 Koral Beton

0.072

m3 Kayu 5/7X4m Kayu Kruing

0.06

Kg Paku Biasa 2" - 5"

0.45

Kg Meni Besi C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

10%

F

2

A.2.2.1.4

1

Harga Satuan Pekerjaan (D+E) Overhead & Profit (contah 10%) m' Pengukuran dan Pemasangan Bouwplank A

L.01

0.1

OH Pekerja

L.02

0.1

OH Tukang Kayu

L.03

0.01

L.04

0.005

OH Kepala Tukang OH Mandor B

0.012 0.02 0.007

3

A.2.2.1.5

Tenaga

1

Bahan

m3 Kayu 5/7x 4m Kayu Kruing Kg Paku Biasa 2" - 5" m3 Kayu Papan 3/20 Kruing C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

10%

m2 Pembuatan Kantor Sementara dg Lantai Plesteran A

Tenaga

No.

SNI

KODE

KOEF

URAIAN PAKERJAAN

SAT.

L.01

2

OH Pekerja

L.02

2

OH Tukang Kayu

L.02

1

OH Tukang Batu

L.03

0.3

L.04

0.05

OH Kepala Tukang OH Mandor B

Bahan

1.25

Btg Kayu Dolken Ø 8 - 10 / 4 m

0.18

m3 Kayu

0.85

Kg Paku Biasa 2" - 5"

1.1

Kg Besi Strip

35

Kg Portland Sement

0.15

m3 Pasir pasang

0.1

m3 Pasir Beton

0.15

m3 Koral Beton

30 buah Batu bata Merah 0.25

Lbr Seng Plat

2 buah Jendela Naco 0.08

m2 Kaca Polos

0.15 buah Kunci Tanam 0.3 buah Engsel 0.06

Lbr Plywood 4 mm

No.

4

SNI

KODE

KOEF

1

A.2.2.1.7

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

1

OH Pekerja

L.02

2

OH Tukang Kayu

L.03

0.2

L.04

0.05

OH Kepala Tukang OH Mandor B

0.21 0.3

A.2.2.1.9

Bahan

Btg Kayu Dolken diameter 8 - 10 / 400 cm m3 Kayu Kg Paku Biasa 2" - 5"

10.5

Kg Portland Semen

0.03

m3 Pasir Beton

0.05

m3 Koral Beton

1.5

1

Lbr Seng Gelombang BJLS 32 C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

Tenaga

L.01

0.1

OH Pekerja

L.04

0.05

OH Mandor

A.2.2.1.10

1

B

Bahan

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

m2 Pembuatan Steger/Perancah dari Bambu A

Tenaga

L.01

1.00

OH Pekerja

L.02

2.00

OH Tukang Kayu

L.03

0.200

L.04

0.0500

OH Kepala Tukang OH Mandor B

1.250

10%

m2 Membersihkan Lapangan dan Perataan A

6

Tenaga

L.01

1.7

10%

m2 Pembuatan Gudang Semen dan Peralatan A

5

URAIAN PAKERJAAN

SAT.

Bahan

Btg Bambu diameter 6 - 8 / 600 cm

10%

No.

SNI

KODE

KOEF 0.186

7

A.2.2.1.11

Kg Tali Ijuk C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

10%

1 bh Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm A

Tenaga

L.02

0.300

OH Tukang Kayu

L.03

0.030

OH Kepala Tukang B

8

URAIAN PAKERJAAN

SAT.

A.2.2.1.13

Bahan

0.036

m3 Kayu Papan Kelas III

0.036

m3 Kayu Balok Kelas III

0.080

kg Paku Biasa

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

10%

m3 Bongkaran Beton Bertulang A

Tenaga

L.02

13.334

OH Pekerja

L.04

0.666

OH Mandor B

Bahan

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

10%

No.

SNI

9

A.2.2.1.14

KODE

KOEF

URAIAN PAKERJAAN

SAT.

1

m3 Bongkaran Dinding Tembok Bata Merah B

Tenaga

L.02

6.667

OH Pekerja

L.04

0.033

OH Mandor B

Bahan

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

10%

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

dari Seng Gelombang Tinggi 2,00 m

598,752.00 `

48,300.00 57,000.00

11,400.00

84,000.00

33,600.00

87,000.00

1,740.00

78,000.00

1,560.00 496,020.00

18,000.00

22,500.00

1,360.00

3,400.00

50,000.00

60,000.00

280,000.00

1,400.00

270,000.00

2,430.00

5,500,000.00

396,000.00

14,000.00

840.00

21,000.00

9,450.00 544,320.00 54,432.00 598,752.00 136,004.00 15,360.00

57,000.00

5,700.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

390.00 108,280.00

5,500,000.00

66,000.00

14,000.00

280.00

6,000,000.00

42,000.00 123,640.00 12,364.00 136,004.00 1,810,858.50 396,000.00

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

57,000.00

114,000.00

84,000.00

168,000.00

84,000.00

84,000.00

87,000.00

26,100.00

78,000.00

3,900.00 1,250,235.00

18,000.00

22,500.00

5,500,000.00

990,000.00

14,000.00

11,900.00

12,500.00

13,750.00

1,360.00

47,600.00

210,000.00

31,500.00

280,000.00

28,000.00

270,000.00

40,500.00

520.00

15,600.00

15,000.00

3,750.00

12,500.00

25,000.00

61,000.00

4,880.00

67,500.00

10,125.00

4,500.00

1,350.00

63,000.00

3,780.00

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

1,646,235.00 164,623.50 1,810,858.50 1,702,008.00 246,300.00 57,000.00

57,000.00

84,000.00

168,000.00

87,000.00

17,400.00

78,000.00

3,900.00 1,300,980.00

18,000.00

30,600.00

5,500,000.00

1,155,000.00

14,000.00

4,200.00

1,360.00

14,280.00

280,000.00

8,400.00

270,000.00

13,500.00

50,000.00

75,000.00 1,547,280.00 154,728.00 1,702,008.00 10,560.00 9,600.00

57,000.00

5,700.00

78,000.00

3,900.00

9,600.00 960.00 10,560.00 286,316.80 246,300.00 57,000.00

57,000.00

84,000.00

168,000.00

87,000.00

17,400.00

78,000.00

3,900.00 13,988.00

10,000.00

12,500.00

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

8,000.00

1,488.00 260,288.00 26,028.80 286,316.80 487,223.00 27,810.00

84,000.00

25,200.00

87,000.00

2,610.00 415,120.00

6,000,000.00

216,000.00

5,500,000.00

198,000.00

14,000.00

1,120.00 442,930.00 44,293.00 487,223.00 893,184.60 811,986.00

57,000.00

760,038.00

78,000.00

51,948.00

811,986.00 81,198.60 893,184.60

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

420,852.30 382,593.00 57,000.00

380,019.00

78,000.00

2,574.00

382,593.00 38,259.30 420,852.30

No.

SNI

II

A.2.3.1

1

A.2.3.1.1

KODE

KOEF

URAIAN PEKERJAAN

SAT.

HARGA SATUAN PEKERJAAN TANAH 1

m3 A

Menggali Tanah Biasa Sedalam 1 m TENAGA

L.01

0.75

OH

Pekerja

L.04

0.025

OH

Mandor

B

BAHAN

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E) Overhead & Profit (contah 10%)

2

A.2.3.1.2

1

m3 A

3

TENAGA

L.01

0.90

OH

Pekerja

L.04

0.045

OH

Mandor

B

BAHAN

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

A.2.3.1.3

1

m3 A

4

Menggali Tanah Biasa Sedalam 2 m

Menggali Tanah Biasa Sedalam 3 m TENAGA

L.01

1.05

OH

Pekerja

L.04

0.067

OH

Mandor

B

BAHAN

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

A.2.3.1.4

1

m3

Menggali Tanah Keras Sedalam 1 m TENAGA

5 414275883.xlsx

A.2.3.1.5

L.01

1.000

OH

Pekerja

L.04

0.032

OH

Mandor

B

BAHAN

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m3

Menggali Tanah Cadas Sedalam 1 m 432/193

abk 2-14

No.

SNI

KODE

KOEF

A

6

1.50

OH

Pekerja

L.04

0.060

OH

Mandor

B

BAHAN

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

A.2.3.1.6

1

m3

TENAGA

1.200

OH

Pekerja

L.04

0.045

OH

Mandor

B

BAHAN

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

A.2.3.1.7

1

m2

Mengerjakan Striping Tebing Setinggi 1 m TENAGA

L.01

0.05

OH

Pekerja

L.04

0.005

OH

Mandor

B

BAHAN

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

m3

MembuangTanah sejauh 30 m'

A.2.3.1.8

1

A

414275883.xlsx

Menggali Tanah Lumpur Sedalam 1 m

L.01

A

8

TENAGA

L.01

A

7

URAIAN PEKERJAAN

SAT.

TENAGA

L.01

0.330

OH

Pekerja

L.04

0.010

OH

Mandor

432/194

abk 2-14

No.

9

SNI

KODE

A.2.3.1.9

KOEF

1

URAIAN PEKERJAAN

SAT. B

BAHAN

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

m3

Pengurugan Kembali

Pengurugan Kembali di hitung dari 1/3 kali koefisien Peke A

10

L.01

0.50

OH

Pekerja

L.04

0.050

OH

Mandor

B

BAHAN

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

m3

Pemadatan Tanah (per 20 cm)

A.2.3.1.10

1

A

11

0.5

OH

Pekerja

L.04

0.05

OH

Mandor

B

BAHAN

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

A.2.3.1.11

1

m3

Urugan Pasir TENAGA

L.01

0.30

OH

Pekerja

L.04

0.01

OH

Mandor

B

BAHAN

1.2

A.2.3.1.12

1

m3

Pasir Urug

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

m3 A

414275883.xlsx

TENAGA

L.01

A

12

TENAGA

Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL TENAGA

L.01

0.800

OH

Pekerja

L.02

0.400

OH

Tukang Batu

L.03

0.04

OH

Kepala Tukang 432/195

abk 2-14

No.

SNI

KODE L.04

13

A.2.3.1.13

KOEF 0.080

OH

Mandor

B

BAHAN

0.135

m3

Pasir Pasang

0.400

m3

Kapur Padam

0.080

m3

Tanah Liat

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

m2 A

A.2.3.1.14

TENAGA

OH

Pekerja

0.015

OH

Mandor

B

BAHAN

kg

Ijuk

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m3 A

Mengurug Sirtu Padat TENAGA

0.25

OH

Pekerja

0.025

OH

Mandor

B

BAHAN

1.2

414275883.xlsx

Pemasangan Lapisan Ijuk tebal 10 cm unt Bidang Resapa

0.15

6.00

14

URAIAN PEKERJAAN

SAT.

m3

Sirtu

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contah 10%)

F

Harga Satuan Pekerjaan (D+E)

432/196

abk 2-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

49,170.00 44,700.00 57,000.00

42,750.00

78,000.00

1,950.00

44,700.00 4,470.00

10%

49,170.00 60,291.00 54,810.00 57,000.00

51,300.00

78,000.00

3,510.00

54,810.00 5,481.00

10%

60,291.00 71,583.60 65,076.00 57,000.00

59,850.00

78,000.00

5,226.00

65,076.00 6,507.60

10%

71,583.60 65,445.60 59,496.00 57,000.00

57,000.00

78,000.00

2,496.00

59,496.00 5,949.60

10%

65,445.60 99,198.00 414275883.xlsx

432/197

abk 2-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 90,180.00

57,000.00

85,500.00

78,000.00

4,680.00

90,180.00 9,018.00

10%

99,198.00 79,101.00 71,910.00 57,000.00

68,400.00

78,000.00

3,510.00

71,910.00 7,191.00

10%

79,101.00 3,564.00 3,240.00 57,000.00

2,850.00

78,000.00

390.00

3,240.00 324.00

10%

3,564.00 21,549.00 19,590.00

414275883.xlsx

57,000.00

18,810.00

78,000.00

780.00

432/198

abk 2-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

19,590.00 1,959.00

10%

21,549.00 11,880.00

bali di hitung dari 1/3 kali koefisien Pekerjaan galian

32,400.00 57,000.00

28,500.00

78,000.00

3,900.00

32,400.00 3,240.00

10%

35,640.00 35,640.00 32,400.00 57,000.00

28,500.00

78,000.00

3,900.00

32,400.00 3,240.00

10%

35,640.00 191,268.00 17,880.00 57,000.00

17,100.00

78,000.00

780.00 156,000.00

130,000.00

156,000.00 173,880.00 17,388.00

10%

191,268.00 257,653.00 88,920.00

414275883.xlsx

57,000.00

45,600.00

84,000.00

33,600.00

87,000.00

3,480.00

432/199

abk 2-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

78,000.00

6,240.00 145,310.00

210,000.00

28,350.00

270,000.00

108,000.00

112,000.00

8,960.00 234,230.00 23,423.00

10%

257,653.00

san Ijuk tebal 10 cm unt Bidang Resapan

63,492.00 9,720.00 57,000.00

8,550.00

78,000.00

1,170.00 48,000.00

8,000.00

48,000.00 57,720.00 5,772.00

10%

63,492.00 178,860.00 16,200.00 57,000.00

14,250.00

78,000.00

1,950.00 146,400.00

122,000.00

146,400.00 162,600.00 16,260.00

10%

178,860.00

414275883.xlsx

432/200

abk 2-14

No.

SNI

III

A.3.2.1.

1

A.3.2.1.1

KODE

KOEF

HARGA SATUAN PEKERJAAN PONDASI 1

m3 A

2

414275883.xlsx

Pemasangan Pondasi Batu Belah 1SP : 3 PP TENAGA

L.01

1.5

OH

Pekerja

L.02

0.750

OH

Tukang Batu

L.03

0.075

OH

Kepala Tukang

L.04

0.075

OH

Mandor

B

BAHAN

1.2

m3

Batu Belah 15/20

202

Kg

Portland Sement

0.485

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%) Pemasangan Pondasi Batu Belah 1SP : 4 PP

1

A.3.2.1.2

m3 A

3

URAIAN PEKERJAAN

SAT.

TENAGA

L.01

1.5

OH

Pekerja

L.02

0.750

OH

Tukang Batu

L.03

0.075

OH

Kepala Tukang

L.04

0.075

OH

Mandor

B

BAHAN

1.2

m3

Batu Belah 15/20

163

Kg

Portland Sement

0.52

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

A.3.2.1.3

m3 A

Pemasangan Pondasi Batu Belah 1SP : 5 PP TENAGA

L.01

1.5

OH

Pekerja

L.02

0.750

OH

Tukang Batu

L.03

0.075

OH

Kepala Tukang

L.04

0.075

OH

Mandor

B

BAHAN

1.2

m3

Batu Belah 15/20

432/201

abk 3-14

No.

4

SNI

KODE

KOEF 136

Kg

Portland Sement

0.544

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

A.3.2.1.4

m3 A

5

414275883.xlsx

URAIAN PEKERJAAN

SAT.

Pemasangan Pondasi Batu Belah 1SP : 6 PP TENAGA

L.01

1.5

OH

Pekerja

L.02

0.750

OH

Tukang Batu

L.03

0.075

OH

Kepala Tukang

L.04

0.075

OH

Mandor

B

BAHAN

1.2

m3

Batu Belah 15/20

117

Kg

Portland Sement

0.561

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

A.3.2.1.5

m3

Pemasangan Pondasi Batu Belah 1SP : 8 PP

A

Tenaga

L.01

1.5

OH

Pekerja

L.02

0.750

OH

Tukang Batu

L.03

0.075

OH

Kepala Tukang

L.04

0.075

OH

Mandor

432/202

abk 3-14

No.

SNI

KODE

KOEF

B

6

7

414275883.xlsx

Bahan

1.2

m3

Batu Belah 15/20

91

Kg

Portland Sement

0.584

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

A.3.2.1.6

URAIAN PEKERJAAN

SAT.

m3

Pemasangan Pondasi Batu Belah 1SP : 1KP : 2PP

A

Tenaga

L.01

1.5

OH

Pekerja

L.02

0.750

OH

Tukang Batu

L.03

0.075

OH

Kepala Tukang

L.04

0.075

OH

Mandor

B

Bahan

1.2

m3

Batu Belah 15/20

0.17

m3

Kapur Pasang (KP)

0.17

Kg

Semen Merah (SM)

0.340

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

A.3.2.1.7

m3

Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP

A

Tenaga

L.01

1.5

OH

Pekerja

L.02

0.750

OH

Tukang Batu

L.03

0.075

OH

Kepala Tukang

L.04

0.075

OH

Mandor

B

Bahan

1.2

m3

Batu Belah 15/20

61

kg

Portland Sement

0.147

m3

Kapur Pasang

0.492

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

432/203

abk 3-14

No.

SNI

KODE

KOEF

F 8

9

414275883.xlsx

1

A.3.2.1.8

URAIAN PEKERJAAN

SAT.

m3

Harga Satuan Pekerjaan (D+E) Pemasangan Pondasi Batu Belah, ¼ SP : 1KP : 4 PP

A

Tenaga

L.01

1.5

OH

Pekerja

L.02

0.750

OH

Tukang Batu

L.03

0.075

OH

Kepala Tukang

L.04

0.075

OH

Mandor

B

Bahan

1.2

m3

Batu Belah 15/20

41

kg

Portland Sement

0.131

m3

Kapur Pasang

0.492

m3

Pasir

1

A.3.2.1.9

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m3

Pemasang Batu Kosong/Anstamping

A

Tenaga

L.01

0.78

OH

Pekerja

L.02

0.39

OH

Tukang Batu

L.03

0.039

OH

Kepala Tukang

L.04

0.039

OH

Mandor

B

Bahan

1.2

m3

Batu Belah 15/20

0.432

m3

Pasir Urug

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/204

abk 3-14

No.

SNI

10

A.3.2.1.10

11

414275883.xlsx

KODE

KOEF

URAIAN PEKERJAAN

SAT. 1

m3

Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR

A

Tenaga

L.01

3.4

OH

Pekerja

L.02

0.85

OH

Tukang Batu

L.03

0.085

OH

Kepala Tukang

L.04

0.15

OH

Mandor

B

Bahan

0.480

m3

Batu Belah 15/20 cm

126

Kg

Besi Beton

194

Kg

Portland Semen

0.312

m3

Pasir Beton

0.468

m3

Koral Beton

1.8

Kg

Kawat Beton

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

A.3.2.1.11

m3

Pasang Pondasi Sumuran diameter 100 cm

A

Tenaga

L.01

2.40

OH

Pekerja

L.02

0.8

OH

Tukang Batu

L.03

0.08

OH

Kepala Tukang

L.04

0.119

OH

Mandor

B

Bahan

0.45

m3

Batu Belah 15/20 cm

194

Kg

Portland Semen

0.312

m3

Pasir Beton

0.468

m3

Koral Beton

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/205

abk 3-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

N PEKERJAAN PONDASI

414275883.xlsx

852,549.50 160,875.00 57,000.00

85,500.00

84,000.00

63,000.00

87,000.00

6,525.00

78,000.00

5,850.00 614,170.00

198,000.00

237,600.00

1,360.00

274,720.00

210,000.00

101,850.00 775,045.00 77,504.50

10%

852,549.50 802,290.50 160,875.00 57,000.00

85,500.00

84,000.00

63,000.00

87,000.00

6,525.00

78,000.00

5,850.00 568,480.00

198,000.00

237,600.00

1,360.00

221,680.00

210,000.00

109,200.00 729,355.00 72,935.50

10%

802,290.50 767,442.50 160,875.00 57,000.00

85,500.00

84,000.00

63,000.00

87,000.00

6,525.00

78,000.00

5,850.00 536,800.00

198,000.00 432/206

237,600.00 abk 3-14

URAIAN PEKERJAAN

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

1,360.00

184,960.00

210,000.00

114,240.00 697,675.00 69,767.50

10%

767,442.50 742,945.50 160,875.00 57,000.00

85,500.00

84,000.00

63,000.00

87,000.00

6,525.00

78,000.00

5,850.00 514,530.00

198,000.00

237,600.00

1,360.00

159,120.00

210,000.00

117,810.00 675,405.00 67,540.50

10%

742,945.50 709,362.50 160,875.00 57,000.00

85,500.00

84,000.00

63,000.00

87,000.00

6,525.00

78,000.00

5,850.00

432/207

abk 3-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 484,000.00

198,000.00

237,600.00

1,360.00

123,760.00

210,000.00

122,640.00 644,875.00 64,487.50

10%

709,362.50

dasi Batu Belah 1SP : 1KP : 2PP

600,451.50 160,875.00 57,000.00

85,500.00

84,000.00

63,000.00

87,000.00

6,525.00

78,000.00

5,850.00 384,990.00

198,000.00

237,600.00

270,000.00

45,900.00

177,000.00

30,090.00

210,000.00

71,400.00 545,865.00 54,586.50

10%

600,451.50

dasi Batu Belah, 1 SP : 3 KP : 10 PP

414275883.xlsx

686,889.50 160,875.00 57,000.00

85,500.00

84,000.00

63,000.00

87,000.00

6,525.00

78,000.00

5,850.00 463,570.00

198,000.00

237,600.00

1,360.00

82,960.00

270,000.00

39,690.00

210,000.00

103,320.00 624,445.00 62,444.50

10% 432/208

abk 3-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 686,889.50

dasi Batu Belah, ¼ SP : 1KP : 4 PP

414275883.xlsx

652,217.50 160,875.00 57,000.00

85,500.00

84,000.00

63,000.00

87,000.00

6,525.00

78,000.00

5,850.00 432,050.00

198,000.00

237,600.00

1,360.00

55,760.00

270,000.00

35,370.00

210,000.00

103,320.00 592,925.00 59,292.50

10%

652,217.50 415,156.50 83,655.00 57,000.00

44,460.00

84,000.00

32,760.00

87,000.00

3,393.00

78,000.00

3,042.00 293,760.00

198,000.00

237,600.00

130,000.00

56,160.00 377,415.00 37,741.50

10%

415,156.50

432/209

abk 3-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah

414275883.xlsx

2,284,668.10 284,295.00 57,000.00

193,800.00

84,000.00

71,400.00

87,000.00

7,395.00

78,000.00

11,700.00 1,792,676.00

198,000.00

95,040.00

10,000.00

1,260,000.00

1,360.00

263,840.00

280,000.00

87,360.00

127,000.00

59,436.00

15,000.00

27,000.00 2,076,971.00 207,697.10

10%

2,284,668.10 791,975.80 220,242.00 57,000.00

136,800.00

84,000.00

67,200.00

87,000.00

6,960.00

78,000.00

9,282.00 499,736.00

198,000.00

89,100.00

1,360.00

263,840.00

280,000.00

87,360.00

127,000.00

59,436.00 719,978.00 71,997.80

10%

791,975.80

432/210

abk 3-14

No.

SNI

IV

A.4.4.1

414275883.xlsx

KODE

KOEF

URAIAN PEKERJAAN

SAT.

HARGA SATUAN PEKERJAAN PASANGAN DINDING

1 A.4.4.1.1

1

m2

Pemasangan Dinding Bata Merah ukuran (5x11x22) cm Teba

A

Tenaga

L.01

0.6

OH

Pekerja

L.02

0.2

OH

Tukang Batu

L.03

0.02

OH

Kepala Tukang Batu

L.04

0.03

OH

Mandor

B

Bahan

140

2 A.4.4.1.2

Buah Bata Merah

43.5

Kg

Portland Semen (PC)

0.08

m3

Pasir Pasang (PP)

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%) Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teba

m2 A

Tenaga

L.01

0.6

OH

Pekerja

L.02

0.2

OH

Tukang Batu

L.03

0.02

OH

Kepala Tukang Batu

L.04

0.03

OH

Mandor

B

Bahan

140

3 A.4.4.1.3

Buah Bata Merah

32.95

Kg

Portland Semen (PC)

0.091

m3

Pasir Pasang (PP)

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teba

A

Tenaga

L.01

0.6

OH

Pekerja

L.02

0.2

OH

Tukang Batu

432/211

abk 4-14

No.

414275883.xlsx

SNI

KODE

KOEF

URAIAN PEKERJAAN

SAT.

L.03

0.02

OH

Kepala Tukang Batu

L.04

0.03

OH

Mandor

B

Bahan

140

4 A.4.4.1.4

Buah Bata Merah

26.55

Kg

Portland Semen (PC)

0.093

m3

Pasir Pasang (PP)

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teba

A

Tenaga

L.01

0.6

OH

Pekerja

L.02

0.2

OH

Tukang Batu

L.03

0.02

OH

Kepala Tukang Batu

L.04

0.03

OH

Mandor

B

Bahan

140

Buah Bata Merah

22.2

Kg

Portland Semen (PC)

0.102

m3

Pasir Pasang (PP)

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/212

abk 4-14

No.

414275883.xlsx

SNI

KODE

5 A.4.4.1.5

KOEF

URAIAN PEKERJAAN

SAT. 1

m2

Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teba

A

Tenaga

L.01

0.6

OH

Pekerja

L.02

0.2

OH

Tukang Batu

L.03

0.02

OH

Kepala Tukang Batu

L.04

0.03

OH

Mandor

B

Bahan

140

6 A.4.4.1.6

Buah Bata Merah

18.5

Kg

Portland Semen (PC)

0.122

m3

Pasir Pasang (PP)

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Teba

A

Tenaga

L.01

0.6

OH

Pekerja

L.02

0.2

OH

Tukang Batu

L.03

0.02

OH

Kepala Tukang Batu

L.04

0.03

OH

Mandor

B

Bahan

140

7 A.4.4.1.7

Buah Bata Merah

10.08

Kg

Portland Semen (PC)

0.0925

m3

Pasir Pasang (PP)

0.0275

m3

Kapur Pasang (KP)

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal

A

Tenaga

L.01

0.30

OH

Pekerja

L.02

0.1

OH

Tukang Batu

432/213

abk 4-14

No.

414275883.xlsx

SNI

KODE

KOEF

URAIAN PEKERJAAN

SAT.

L.03

0.01

OH

Kepala Tukang

L.04

0.015

OH

Mandor

B

Bahan

70

8 A.4.4.1.8

Buah Bata Merah 5 x 11 x 22

18.95

Kg

Portland Semen

0.038

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal

A

Tenaga

L.01

0.30

OH

Pekerja

L.02

0.1

OH

Tukang Batu

L.03

0.01

OH

Kepala Tukang

L.04

0.015

OH

Mandor

B

Bahan

70

Buah Bata Merah 5 x 11 x 22

14.37

Kg

Portland Semen

0.04

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/214

abk 4-14

No.

414275883.xlsx

SNI

KODE

9 A.4.4.1.9

KOEF

URAIAN PEKERJAAN

SAT. 1

m2

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal

A

Tenaga

L.01

0.30

OH

Pekerja

L.02

0.1

OH

Tukang Batu

L.03

0.01

OH

Kepala Tukang

L.04

0.015

OH

Mandor

B

Bahan

70

10 A.4.4.1.10

Buah Bata Merah 5 x 11 x 22

11.50

Kg

Portland Semen

0.043

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal

A

Tenaga

L.01

0.30

OH

Pekerja

L.02

0.1

OH

Tukang Batu

L.03

0.01

OH

Kepala Tukang

L.04

0.015

OH

Mandor

B

Bahan

70

11 A.4.4.1.11

Buah Bata Merah 5 x 11 x 22

9.68

Kg

Portland Semen

0.045

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal

A

Tenaga

L.01

0.30

OH

Pekerja

L.02

0.1

OH

Tukang Batu

L.03

0.01

OH

Kepala Tukang

432/215

abk 4-14

No.

414275883.xlsx

SNI

KODE L.04

KOEF 0.015

70

12 A.4.4.1.12

URAIAN PEKERJAAN

SAT. OH

Mandor

B

Bahan

Buah Bata Merah 5 x 11 x 22

8.32

Kg

Portland Semen

0.049

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal

A

Tenaga

L.01

0.30

OH

Pekerja

L.02

0.1

OH

Tukang Batu

L.03

0.01

OH

Kepala Tukang

L.04

0.015

OH

Mandor

B

Bahan

70

Buah Bata Merah 5 x 11 x 22

6.50

Kg

Portland Semen

0.05

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/216

abk 4-14

No.

414275883.xlsx

SNI

KODE

13 A.4.4.1.13

KOEF

URAIAN PEKERJAAN

SAT. 1

m2

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal

A

Tenaga

L.01

0.30

OH

Pekerja

L.02

0.1

OH

Tukang Batu

L.03

0.01

OH

Kepala Tukang

L.04

0.015

OH

Mandor

B

Bahan

70

14 A.4.4.1.14

Buah Bata Merah 5 x 11 x 22

4.5

Kg

Portland Semen

0.05

m3

Pasir Pasang

0.015

m3

Kapur Padam

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal

A

Tenaga

L.01

0.30

OH

Pekerja

L.02

0.1

OH

Tukang Batu

L.03

0.01

OH

Kepala Tukang

L.04

0.015

OH

Mandor

B

Bahan

70

15 A.4.4.1.15

0.018

m3

Semen Merah

0.018

m3

Pasir Pasang

0.018

m3

Kapur Padam

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

L.01

Buah Bata Merah 5 x 11 x 22

0.30

m2

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal

A

Tenaga

OH

Pekerja

432/217

abk 4-14

No.

414275883.xlsx

SNI

KODE

KOEF

URAIAN PEKERJAAN

SAT.

L.02

0.1

OH

Tukang Batu

L.03

0.01

OH

Kepala Tukang

L.04

0.015

OH

Mandor

B

Bahan

70

16 A.4.4.1.20

Buah Bata Merah 5 x 11 x 22

0.014

m3

Semen Merah

0.028

m3

Pasir Pasang

0.014

m3

Kapur Padam

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP

A

Tenaga

L.01

0.300

OH

Pekerja

L.02

0.100

OH

Tukang Batu

L.03

0.010

OH

Kepala Tukang

L.04

0.015

OH

Mandor

B

Bahan

12.500

buah

Batako

15.160

kg

PC

0.364

m3

Pasir Pasang

0.280

kg

Besi Angkur Ø 8 mm

432/218

abk 4-14

No.

414275883.xlsx

SNI

KODE

17 A.4.4.1.21

KOEF

URAIAN PEKERJAAN

SAT.

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP

A

Tenaga

L.01

0.300

OH

Pekerja

L.02

0.100

OH

Tukang Batu

L.03

0.010

OH

Kepala Tukang

L.04

0.015

OH

Mandor

B

Bahan

12.500

buah

Batako

12.130

kg

PC

0.388

m3

Pasir Pasang

0.280

kg

Besi Angkur Ø 8 mm

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

18 A.4.4.1.22

1

m2

Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm

A

Tenaga

L.01

0.30

OH

Pekerja

L.02

0.1

OH

Tukang Batu

L.03

0.01

OH

Kepala Tukang

L.04

0.015

OH

Mandor

B

Bahan

30

Buah Terawang / Roster

14

kg

Portland Semen

0.032

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

432/219

abk 4-14

No.

414275883.xlsx

SNI

KODE

KOEF

F

19 A.4.4.1.23

URAIAN PEKERJAAN

SAT.

1

m2

Harga Satuan Pekerjaan (D+E)

Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm

A

Tenaga

L.01

0.30

OH

Pekerja

L.02

0.1

OH

Tukang Batu

L.03

0.01

OH

Kepala Tukang

L.04

0.015

OH

Mandor

B

Bahan

30

Buah Terawang / Roster

11

kg

Portland Semen

0.035

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/220

abk 4-14

RAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

ERJAAN PASANGAN DINDING

ta Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1SP: 2PP

224,224.00 55,080.00 57,000.00

34,200.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

2,340.00 148,760.00

520.00

72,800.00

1,360.00

59,160.00

210,000.00

16,800.00

203,840.00 20,384.00

10%

224,224.00

ta Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP

210,982.20 55,080.00 57,000.00

34,200.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

2,340.00 136,722.00

520.00

72,800.00

1,360.00

44,812.00

210,000.00

19,110.00

191,802.00 19,180.20

10%

210,982.20

ta Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP

414275883.xlsx

201,869.80 55,080.00

432/221

57,000.00

34,200.00

84,000.00

16,800.00 abk 4-14

RAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 87,000.00

1,740.00

78,000.00

2,340.00 128,438.00

520.00

72,800.00

1,360.00

36,108.00

210,000.00

19,530.00

183,518.00 18,351.80

10%

201,869.80

ta Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP

414275883.xlsx

197,441.20 55,080.00 57,000.00

34,200.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

2,340.00 124,412.00

520.00

72,800.00

1,360.00

30,192.00

210,000.00

21,420.00

179,492.00 17,949.20

10%

197,441.20

432/222

abk 4-14

RAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

ta Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP

196,526.00 55,080.00 57,000.00

34,200.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

2,340.00 123,580.00

520.00

72,800.00

1,360.00

25,160.00

210,000.00

25,620.00

178,660.00 17,866.00

10%

196,526.00

ta Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3 KP :10PP

185,282.68 55,080.00

57,000.00

34,200.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

2,340.00 113,358.80

520.00

72,800.00

1,360.00

13,708.80

210,000.00

19,425.00

270,000.00

7,425.00

168,438.80 16,843.88

10%

185,282.68

ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 2PP

414275883.xlsx

107,461.20 27,540.00

432/223

57,000.00

17,100.00

84,000.00

8,400.00 abk 4-14

RAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 87,000.00

870.00

78,000.00

1,170.00 70,152.00

520.00

36,400.00

1,360.00

25,772.00

210,000.00

7,980.00

97,692.00 9,769.20

10%

107,461.20

ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP

414275883.xlsx

101,071.52 27,540.00 57,000.00

17,100.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

1,170.00 64,343.20

520.00

36,400.00

1,360.00

19,543.20

210,000.00

8,400.00

91,883.20 9,188.32

10%

101,071.52

432/224

abk 4-14

RAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP

97,471.00 27,540.00 57,000.00

17,100.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

1,170.00 61,070.00

520.00

36,400.00

1,360.00

15,640.00

210,000.00

9,030.00

88,610.00 8,861.00

10%

97,471.00

ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP

95,210.28 27,540.00 57,000.00

17,100.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

1,170.00 59,014.80

520.00

36,400.00

1,360.00

13,164.80

210,000.00

9,450.00

86,554.80 8,655.48

10%

95,210.28

ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP

414275883.xlsx

94,099.72 27,540.00

432/225

57,000.00

17,100.00

84,000.00

8,400.00

87,000.00

870.00 abk 4-14

RAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 78,000.00

58,005.20 520.00

36,400.00

1,360.00

11,315.20

210,000.00

10,290.00

85,545.20 8,554.52

10%

94,099.72

ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP

414275883.xlsx

1,170.00

91,608.00 27,540.00 57,000.00

17,100.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

1,170.00 55,740.00

520.00

36,400.00

1,360.00

8,840.00

210,000.00

10,500.00

83,280.00 8,328.00

10%

91,608.00

432/226

abk 4-14

RAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3KP : 10PP

93,071.00 27,540.00

57,000.00

17,100.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

1,170.00 57,070.00

520.00

36,400.00

1,360.00

6,120.00

210,000.00

10,500.00

270,000.00

4,050.00

84,610.00 8,461.00

10%

93,071.00

ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 1SM : 1PP

83,342.60 27,540.00

57,000.00

17,100.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

1,170.00 48,226.00

520.00

36,400.00

177,000.00

3,186.00

210,000.00

3,780.00

270,000.00

4,860.00

75,766.00 7,576.60

10%

83,342.60

ta Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1KP : 1SM : 2PP

414275883.xlsx

83,685.80 27,540.00

57,000.00 432/227

17,100.00 abk 4-14

RAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 84,000.00

8,400.00

87,000.00

870.00

78,000.00

1,170.00 48,538.00

520.00

36,400.00

177,000.00

2,478.00

210,000.00

5,880.00

270,000.00

3,780.00

76,078.00 7,607.80

10%

83,685.80

/CB 10, speci camp. 1SP : 3PP

414275883.xlsx

195,137.36 27,540.00 57,000.00

17,100.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

1,170.00 149,857.60

432/228

4,000.00

50,000.00

1,360.00

20,617.60

210,000.00

76,440.00

10,000.00

2,800.00

abk 4-14

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

RAIAN PEKERJAAN

177,397.60 17,739.76

10%

195,137.36

/CB 10, speci camp. 1SP : 4PP

196,148.48 27,540.00 57,000.00

17,100.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

1,170.00 150,776.80

4,000.00

50,000.00

1,360.00

16,496.80

210,000.00

81,480.00

10,000.00

2,800.00

178,316.80 17,831.68

10%

196,148.48

awang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 2PP

414275883.xlsx

246,730.00 27,540.00 57,000.00

17,100.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

1,170.00 196,760.00

5,700.00

171,000.00

1,360.00

19,040.00

210,000.00

6,720.00

224,300.00 22,430.00

10% 432/229

abk 4-14

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

RAIAN PEKERJAAN

246,730.00

awang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP

414275883.xlsx

242,935.00 27,540.00 57,000.00

17,100.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

1,170.00 193,310.00

5,700.00

171,000.00

1,360.00

14,960.00

210,000.00

7,350.00

220,850.00 22,085.00

10%

242,935.00

432/230

abk 4-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

V

A.4.4.2 1

KODE

KOEF

1

A,4,4,2.1 L.01 L.02 L.03 L.04

0.3 0.15 0.015 0.015 15.504 0.016

2

1

A,4,4,2.2 L.01 L.02 L.03 L.04

0.3 0.15 0.015 0.015 10.224 0.020

3

1

A,4,4,2.3 L.01 L.02 L.03 L.04

0.3 0.15 0.015 0.015 7.776 0.023

4

414275883.xlsx

1

A,4,4,2.4 L.01 L.02

URAIAN PEKERJAAN

SAT.

0.3 0.15

m2 A OH OH OH OH B Kg m3 C D E F

HARGA SATUAN PEKERJAAN PLESTERAN Pemasangan Plesteran 1 Pc : 1 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%) Pemasangan Plesteran 1 Pc : 2 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH OH OH B Kg m3 C D E F

Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH

Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm Tenaga Pekerja Tukang batu

m2 A OH OH OH OH B Kg m3 C D E F

432/231

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

KODE L.03 L.04

KOEF 0.015 0.015

OH OH B Kg m3 C D E F

Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH OH OH B Kg m3 C D E F

Pemasangan Plesteran 1 Pc : 5 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

1

m2

0.3 0.15 0.015 0.015

OH OH OH OH

4.416 0.027

Kg m3 C D E F

Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

6.240 0.024

5

1

A,4,4,2.5 L.01 L.02 L.03 L.04

0.3 0.15 0.015 0.015 5.184 0.026

6

414275883.xlsx

A,4,4,2.6 L.01 L.02 L.03 L.04

URAIAN PEKERJAAN

SAT.

432/232

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

No. 7

SNI

KODE

KOEF 1

A,4,4,2.7 L.01 L.02 L.03 L.04

0.3 0.15 0.015 0.015 3.936 0.028

8

1

A,4,4,2.8 L.01 L.02 L.03 L.04

0.30 0.15 0.015 0.015 3.456 0.029

9

1

A.4.4.2.9 L.01 L.02 L.03 L.04

0.36 0.12 0.012 0.018 5.760 0.003 0.013

1

10 A,4,4,2.10

414275883.xlsx

L.01 L.02

URAIAN PEKERJAAN

SAT.

0.36 0.12

m2 A OH OH OH OH B Kg m3 C D E F

Pemasangan Plesteran 1 Pc : 7 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH OH OH B Kg m3 C D E F

Pemasangan Plesteran 1 Pc : 8 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH OH OH B Kg m3 m3 C D E F

Pemasangan Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Kapur Pasang Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH

Pemasangan Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm Tenaga Pekerja Tukang batu 432/233

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

KODE L.03 L.04

KOEF 0.012 0.018 3 0.005 0.020

1

11 A,4,4,2.11 L.01 L.02 L.03 L.04

0.36 0.12 0.012 0.018 0.009 0.009 0.009

1

12 A,4,4,2.12

414275883.xlsx

L.01 L.02 L.03 L.04

URAIAN PEKERJAAN

SAT.

0.36 0.12 0.012 0.018 0.007 0.007 0.015

OH OH B kg m3 m3 C D E F

Kepala Tukang Mandor Bahan Portland Semen Kapur Padam Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH OH OH B m3 m3 m3 C D E F

Pemasangan Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Semen Merah Kapur Padam Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH OH OH B m3 m3 m3

Pemasangan Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Semen Merah Kapur Padam Pasir Pasang

432/234

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

KODE

KOEF

C D E F 1

13 A,4,4,2.13 L.01 L.02 L.03 L.04

0.40 0.20 0.020 0.022 13.632 0.027

1

14 A,4,4,2.14 L.01 L.02 L.03 L.04

0.26 0.2 0.02 0.013 10.368 0.031

1

15 A,4,4,2.15 L.01 L.02 L.03 L.04

0.40 0.20 0.020 0.022 8.320 0.032

16 A,4,4,2.16 414275883.xlsx

URAIAN PEKERJAAN

SAT.

1

PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH OH OH B kg m3 C D E F

Pemasangan Plesteran 1 Pc : 2 Pp Tebal 20 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH OH OH B Kg m3 C D E F

Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH OH OH B kg m3 C D E F

Pemasangan Plesteran 1 Pc : 4 Pp Tebal 20 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm 432/235

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

KODE

L.01 L.02 L.03 L.04

KOEF

0.400 0.200 0.020 0.022 6.912 0.035

1

17 A,4,4,2.17 L.01 L.02 L.03 L.04

0.40 0.2 0.02 0.022 5.888 0.036

1

18 A,4,4,2.18

414275883.xlsx

L.01 L.02 L.03 L.04

URAIAN PEKERJAAN

SAT.

0.440 0.22 0.022 0.022

A OH OH OH OH B Kg m3 C D E F

Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH OH OH B Kg m3 C D E F

Pemasangan Plesteran 1Pc : 6Pp Tebal 20 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH OH OH

Pemasangan Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor

432/236

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

KODE

KOEF

B m3 m3 m3 C D E F

Bahan Semen Merah Kapur Padam Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH OH OH B Kg m3 C D E F

Pemasangan Berapen 1 Pc : 5Pp Tebal 15 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m' A OH OH OH OH B Kg m3 C D E F

Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

1

m2

0.30 0.1 0.01 0.015

OH OH OH OH

4.32 0.006

Kg m3 C

Pemasangan Plesteran Ciprat 1Pc : 2 Pp Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen Pasir Pasang PERALATAN

0.009 0.009 0.018

1

19 A,4,4,2.19 L.01 L.02 L.03 L.04

0.15 0.075 0.008 0.008 5.184 0.026

1

20 A,4,4,2.20 L.01 L.02 L.03 L.04

0.080 0.40 0.040 0.004 0.5 0.013

21 A,4,4,2.23

414275883.xlsx

L.01 L.02 L.03 L.04

URAIAN PEKERJAAN

SAT.

432/237

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

KODE

KOEF

D E F 1

22 A,4,4,2.24 L.01 L.02 L.03 L.04

Pemasangan Finishing Siar Pasangan Dinding Bata Merah ( Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH OH OH B Kg C D E F

Pemasangan Finishing Siar Pasangan Dinding Conblock ek Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Portland Semen PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

1

m2

0.3 0.15 0.015 0.015

OH OH OH OH

Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp Tenaga Pekerja Tukang batu Kepala Tukang Mandor

0.15 0.075 0.008 0.008

1 L.01 L.02 L.03 L.04

0.070 0.035 0.004 0.004 1.600

24 A,4,4,2.26

414275883.xlsx

L.01 L.02 L.03 L.04

Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

m2 A OH OH OH OH B Kg C D E F

3.108

23 A,4,4,2.25

URAIAN PEKERJAAN

SAT.

432/238

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

KODE

25 A,4,4,2.27

414275883.xlsx

KOEF

URAIAN PEKERJAAN

SAT.

6.34 0.012

Kg m3 C D E F

Bahan Pc PP PERALATAN Jumlah A + B + C Overhead & Profit (contoh 10%) Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Acian Tenaga

L.01

0.20

OH

Pekerja

L.02

0.10

OH

Tukang batu

L.03

0.010

OH

Kepala Tukang

L.04

0.010

OH

Mandor Bahan

3.25

Kg

Portland Semen

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/239

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

eran 1 Pc : 1 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

56,620.44 5,662.04 62,282.48

10%

eran 1 Pc : 2 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

55,307.60 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00 18,104.64 13,904.64 4,200.00 50,279.64 5,027.96 55,307.60

10%

eran 1 Pc : 3 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

52,338.40 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00 15,405.36 10,575.36 4,830.00 47,580.36 4,758.04 52,338.40

10%

eran 1 Pc : 4 Pp Tebal 15 mm

414275883.xlsx

62,282.48 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00 24,445.44 21,085.44 3,360.00

57,000.00 84,000.00 432/240

50,271.54 32,175.00 17,100.00 12,600.00 abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

87,000.00 78,000.00

1,305.00 1,170.00 13,526.40 8,486.40 5,040.00

1,360.00 210,000.00

45,701.40 4,570.14 50,271.54

10%

eran 1 Pc : 5 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

44,685.24 4,468.52 49,153.76

10%

eran 1 Pc : 6 Pp Tebal 15 mm

414275883.xlsx

49,153.76 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00 12,510.24 7,050.24 5,460.00

57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

48,235.84 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00 11,675.76 6,005.76 5,670.00 43,850.76 4,385.08 48,235.84

10%

432/241

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

eran 1 Pc : 7 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

43,407.96 4,340.80 47,748.76

10%

eran 1 Pc : 8 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

47,261.68 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00 10,790.16 4,700.16 6,090.00 42,965.16 4,296.52 47,261.68

10%

eran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 270,000.00 210,000.00

48,863.76 33,048.00 20,520.00 10,080.00 1,044.00 1,404.00 11,373.60 7,833.60 810.00 2,730.00 44,421.60 4,442.16 48,863.76

10%

eran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm

414275883.xlsx

47,748.76 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00 11,232.96 5,352.96 5,880.00

57,000.00 84,000.00 432/242

46,945.80 33,048.00 20,520.00 10,080.00 abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

87,000.00 78,000.00 1,360.00 270,000.00 210,000.00

42,678.00 4,267.80 46,945.80

10%

eran 1 SM : 1 Kp : 1 Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 177,000.00 270,000.00 210,000.00

42,857.10 33,048.00 20,520.00 10,080.00 1,044.00 1,404.00 5,913.00 1,593.00 2,430.00 1,890.00 38,961.00 3,896.10 42,857.10

10%

eran 1 SM : 1 Kp : 2 Pp Tebal 15 mm

414275883.xlsx

1,044.00 1,404.00 9,630.00 4,080.00 1,350.00 4,200.00

57,000.00 84,000.00 87,000.00 78,000.00 177,000.00 270,000.00 210,000.00

432/243

43,259.70 33,048.00 20,520.00 10,080.00 1,044.00 1,404.00 6,279.00 1,239.00 1,890.00 3,150.00

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 39,327.00 3,932.70 43,259.70

10%

eran 1 Pc : 2 Pp Tebal 20 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

67,265.52 6,726.55 73,992.07

10%

eran 1Pc : 3Pp Tebal 20 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

54,984.48 34,374.00 14,820.00 16,800.00 1,740.00 1,014.00 20,610.48 14,100.48 6,510.00 55,998.48 5,599.85 61,598.33

10%

eran 1 Pc : 4 Pp Tebal 20 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

67,200.32 43,056.00 22,800.00 16,800.00 1,740.00 1,716.00 18,035.20 11,315.20 6,720.00 61,091.20 6,109.12 67,200.32

10%

eran 1Pc : 5Pp Tebal 20 mm 414275883.xlsx

73,992.07 43,056.00 22,800.00 16,800.00 1,740.00 1,716.00 24,209.52 18,539.52 5,670.00

65,786.95 432/244

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

59,806.32 5,980.63 65,786.95

10%

eran 1Pc : 6Pp Tebal 20 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

64,486.05 43,056.00 22,800.00 16,800.00 1,740.00 1,716.00 15,567.68 8,007.68 7,560.00 58,623.68 5,862.37 64,486.05

10%

eran 1 SM : 2 Kp : 2 Pp Tebal 20 mm

414275883.xlsx

43,056.00 22,800.00 16,800.00 1,740.00 1,716.00 16,750.32 9,400.32 7,350.00

57,000.00 84,000.00 87,000.00 78,000.00

432/245

60,492.30 47,190.00 25,080.00 18,480.00 1,914.00 1,716.00

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

177,000.00 270,000.00 210,000.00

54,993.00 5,499.30 60,492.30

10%

en 1 Pc : 5Pp Tebal 15 mm 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

31,548.26 16,170.00 8,550.00 6,300.00 696.00 624.00 12,510.24 7,050.24 5,460.00 28,680.24 2,868.02 31,548.26

10%

eran Skoning 1 Pc : 2Pp, lebar 10 mm

414275883.xlsx

7,803.00 1,593.00 2,430.00 3,780.00

57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

49,898.20 41,952.00 4,560.00 33,600.00 3,480.00 312.00 3,410.00 680.00 2,730.00 45,362.00 4,536.20 49,898.20

10%

57,000.00 84,000.00 87,000.00 78,000.00 1,360.00 210,000.00

432/246

38,142.72 27,540.00 17,100.00 8,400.00 870.00 1,170.00 7,135.20 5,875.20 1,260.00

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

URAIAN PEKERJAAN

34,675.20 3,467.52 38,142.72

10%

hing Siar Pasangan Dinding Bata Merah (=20 m') 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00

20,396.88 2,039.69 22,436.57

10%

hing Siar Pasangan Dinding Conblock ekspose (=8 m') 57,000.00 84,000.00 87,000.00 78,000.00 1,360.00

10,742.60 7,590.00 3,990.00 2,940.00 348.00 312.00 2,176.00 2,176.00 9,766.00 976.60 10,742.60

10%

hing Siar Pas.Batu Kali Adukan 1Pc : 2Pp

414275883.xlsx

22,436.57 16,170.00 8,550.00 6,300.00 696.00 624.00 4,226.88 4,226.88

57,000.00 84,000.00 87,000.00 78,000.00

432/247

47,649.14 32,175.00 17,100.00 12,600.00 1,305.00 1,170.00

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

URAIAN PEKERJAAN

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

1,360.00 210,000.00

11,142.40 8,622.40 2,520.00 43,317.40 4,331.74 47,649.14

10%

28,457.00 21,450.00 57,000.00

11,400.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

780.00 4,420.00

1,360.00

4,420.00 25,870.00 2,587.00

10%

28,457.00

432/248

abk 5-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

VI

A.4.6.1

1

A.4.6.1.1

2

KODE

KOEF

URAIAN PEKERJAAN

SAT.

HARGA SATUAN PEKERJAAN 1

m3

Pembuatan & Pemasangan Kosen Pintu & Jendela Ka

A

Tenaga

L.01

7

OH

Pekerja

L.02

21

OH

Tukang Kayu

L.03

2.10

OH

Kepala Tukang

L.04

0.35

OH

Mandor

B

Bahan

A.4.6.1.2

1.1

m3

Kayu Klas I (Jati) , Balok

1.25

kg

Paku Biasa 2" - 5 "

1

kg

Lem Kayu

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m3

K A Y U

Pembuatan & Pemasangan Kosen Pintu & Jendela Ka Tenaga

L.01

6.00

OH

Pekerja

L.02

18.00

OH

Tukang Kayu

L.03

1.80

OH

Kepala Tukang

L.04

0.30

OH

Mandor Bahan

3

A.4.6.1.3

1.2

m3

Kayu Klas II (Kamfer) , Balok

1.25

kg

Paku Biasa 2" - 5 "

1

kg

Lem Kayu

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

Pembuatan & Pemasangan Pintu KlampStandard Kayu

A

Tenaga

L.01

0.35

OH

Pekerja

L.02

1.05

OH

Tukang Kayu

L.03

0.105

OH

Kepala Tukang

L.04

0.018

OH

Mandor

B

Bahan

0.040 414275883.xlsx

m2

m3

Kayu Klas II (Kamfer), papan

432/249

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

KODE

KOEF 0.05

4

A.4.6.1.4

URAIAN PEKERJAAN

SAT.

1

Kg

Paku Biasa 2" - 5 "

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pembuatan & Pemasangan Daun Pintu Klamp Sederha Tenaga

L.01

0.35

OH

Pekerja

L.02

1.05

OH

Tukang Kayu

L.03

0.105

OH

Kepala Tukang

L.04

0.018

OH

Mandor Bahan

5

A.4.6.1.5

414275883.xlsx

0.040

m3

Kayu Klas II (Kamfer), papan

0.05

Kg

Paku Biasa 2" - 5 "

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pembuatan & Pemasangan Daun Pintu Panel, Kayu Kl

A

Tenaga

L.01

1.00

OH

Pekerja

L.02

3.00

OH

Tukang Kayu

L.03

0.30

OH

Kepala Tukang

L.04

0.05

OH

Mandor

B

Bahan

0.04

m3

Kayu Klas II (Kamfer), papan

0.050

kg

Lem Kayu

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/250

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

6

A.4.6.1.6

7

8

KODE

URAIAN PEKERJAAN

SAT. 1

m2

Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu

A

Tenaga

L.01

0.800

OH

Pekerja

L.02

2.400

OH

Tukang Kayu

L.03

0.240

OH

Kepala Tukang

L.04

0.040

OH

Mandor

B

Bahan

A.4.6.1.7

0.024

m3

Kayu Klas II (Kamfer), papan

0.300

kg

Lem Kayu

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pembuatan & Pemasangan Pintu & Jendela Jalusi Kay

A

Tenaga

L.01

1

OH

Pekerja

L.02

3

OH

Tukang Kayu

L.03

0.3

OH

Kepala Tukang

L.04

0.05

OH

Mandor

B

Bahan

A.4.6.1.8

414275883.xlsx

KOEF

0.064

m3

Kayu Klas I (Jati), papan

0.5

kg

Lem Kayu

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangk

A

Tenaga

L.01

0.700

OH

Pekerja

L.02

2.100

OH

Tukang Kayu

L.03

0.210

OH

Kepala Tukang

L.04

0.035

OH

Mandor

B

Bahan

0.025

m3

Kayu Klas II (Kamfer), papan

0.030

Kg

Paku Biasa 1/2" - 1"

0.500

Ltr

Lem Kayu

1.000

Lbr

Plywood tebal 4 mm uk.90x220cm

432/251

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

9

10

SNI

KODE

A.4.6.1.9

URAIAN PEKERJAAN

SAT.

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pembuatan&Pemasangan Pintu Plywood rangkap, ran

A

Tenaga

L.01

0.800

OH

Pekerja

L.02

2.400

OH

Tukang Kayu

L.03

0.240

OH

Kepala Tukang

L.04

0.040

OH

Mandor

B

Bahan

A.4.6.1.10

414275883.xlsx

KOEF

0.0256

m3

Kayu Klas II (Kamfer), papan

0.03

Kg

Paku Biasa 1/2" - 1"

0.5

Ltr

Lem Kayu

1

Lbr

Plywood tebal 4 mm uk.90x220cm

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pembuatan & Pemasangan Jalusi mati Kosen Kayu Kl

A

Tenaga

L.01

0.670

OH

Pekerja

L.02

2.000

OH

Tukang Kayu

L.03

0.200

OH

Kepala Tukang

L.04

0.335

OH

Mandor

B

Bahan

0.06

m3

Kayu Klas I (Jati), papan

0.15

Kg

Paku Biasa 1/2" - 1"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/252

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

11

A.4.6.1.11

12

13

KODE

URAIAN PEKERJAAN

SAT. 1

m2

Pembuatan & Pemasangan Pintu Teakwood Rangkap,

A

Tenaga

L.01

0.80

OH

Pekerja

L.02

2.40

OH

Tukang Kayu

L.03

0.24

OH

Kepala Tukang

L.04

0.04

OH

Mandor

B

Bahan

A.4.6.1.12

0.025

m3

Kayu Klas I (Jati), papan

0.03

Kg

Paku Biasa 1/2" - 1"

0.3

kg

Lem Kayu

1

Lbr

Teakwood (90 x 220) cm x 4 mm

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pembuatan&Pemasangan Pintu Teakwood Rangkap Lapis F

A

Tenaga

L.01

0.850

OH

Pekerja

L.02

2.550

OH

Tukang Kayu

L.03

0.255

OH

Kepala Tukang

L.04

0.043

OH

Mandor

B

Bahan

A.4.6.1.13

414275883.xlsx

KOEF

0.025

m3

Kayu Klas II (Kamfer), papan

0.03

Kg

Paku Biasa 1/2" - 1"

0.08

kg

Lem Kayu

1

Lbr

Teakwood (90 x 220) cm x 4 mm

0.5

Lbr

Formika

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m3

Pembuatan&Memasang Konstruksi Kuda-kuda Konven

A

Tenaga

L.01

4

OH

Pekerja

L.02

12

OH

Tukang Kayu

L.03

1.2

OH

Kepala Tukang

L.04

0.2

OH

Mandor

432/253

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

KODE

KOEF

B

14

15

A.4.6.1.14

Bahan

1.1

m3

Kayu Kamfer, balok

15

Kg

Besi Strip

5.6

Kg

Paku Biasa 2" - 5"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m3

Pembuatan&Pemasangan Konstruksi Kuda-kuda Expo

A

Tenaga

L.01

6.7

OH

Pekerja

L.02

20.1

OH

Tukang Kayu

L.03

2.01

OH

Kepala Tukang

L.04

0.335

OH

Mandor

B

Bahan

A.4.6.1.15

414275883.xlsx

URAIAN PEKERJAAN

SAT.

1.2

m3

Kayu Klas I (jati), balok

15

Kg

Besi Strip

5.6

Kg

Paku Biasa 2" - 5"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m3

Pemasangan konstruksi Gording, Kayu Klas II

A

Tenaga

L.01

2.4

OH

Pekerja

L.02

7.2

OH

Tukang Kayu

L.03

0.72

OH

Kepala Tukang

L.04

0.12

OH

Mandor

B

Bahan

1.1

m3

Kayu Klas I (Kamfer), balok

15

Kg

Besi Strip

3

Kg

Paku Biasa 2" - 5"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/254

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

16

A.4.6.1.16

17

18

KODE

KOEF

1

m2

Pemasangan Rangka Atap Genteng Keramik, Kayu Kla

A

Tenaga

L.01

0.1

OH

Pekerja

L.02

0.1

OH

Tukang Kayu

L.03

0.01

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

A.4.6.1.17

0.014

m3

Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm

0.0036

m3

Reng (2x3) cm

0.25

Kg

Paku Biasa 2" - 5"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Rangka Atap Genteng Beton, Kayu Klas

A

Tenaga

L.01

0.1

OH

Pekerja

L.02

0.1

OH

Tukang Kayu

L.03

0.01

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

A.4.6.1.18

0.014

m3

Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm

0.0072

m3

Reng (2x3) cm

0.25

Kg

Paku Biasa 2" - 5"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Rangka Atap Sirap, Kayu Klas II

A

Tenaga

L.01

0.12

OH

Pekerja

L.02

0.12

OH

Tukang Kayu

L.03

0.012

OH

Kepala Tukang

L.04

0.006

OH

Mandor

B

Bahan

0.014 414275883.xlsx

URAIAN PEKERJAAN

SAT.

m3

Kayu Klas II (Kamfer), balok

432/255

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

KODE

KOEF 0.2

19

20

A.4.6.1.19

1

Kg

Paku Biasa 2" - 5"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Rangka Langit-langit (50x1,00) m, kayu K

A

Tenaga

L.01

0.15

OH

Pekerja

L.02

0.30

OH

Tukang Kayu

L.03

0.030

OH

Kepala Tukang

L.04

0.075

OH

Mandor

B

Bahan

A.4.6.1.20

414275883.xlsx

URAIAN PEKERJAAN

SAT.

0.0154

m3

Kayu Klas II (Kamfer), balok

0.2

Kg

Paku Biasa 2" - 5"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Rangka Langit-langit (60x60) cm, kayu K

A

Tenaga

L.01

0.2

OH

Pekerja

L.02

0.3

OH

Tukang Kayu

L.03

0.03

OH

Kepala Tukang

L.04

0.01

OH

Mandor

B

Bahan

0.0163

m3

Kayu Klas II (Kamfer), balok

0.25

Kg

Paku Biasa 2" - 5"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/256

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

21

A.4.6.1.21

22

23

KODE

URAIAN PEKERJAAN

SAT. 1

m'

Pemasangan Listplank Uk. (3x20)cm Kayu klas I atau I

A

Tenaga

L.01

0.1

OH

Pekerja

L.02

0.2

OH

Tukang Kayu

L.03

0.020

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

A.4.6.1.22

0.0108

m3

Kayu klas I (Jati), papan

0.10

Kg

Paku Biasa 2" - 5"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau k

A

Tenaga

1 L.01

0.1

OH

Pekerja

L.02

0.2

OH

Tukang Kayu

L.03

0.02

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

A.4.6.1.23

414275883.xlsx

KOEF

0.011

m3

Kayu klas II (Kamfer), papan

0.05

Kg

Paku Biasa 2" - 5"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Rangka Dinding Pemisah (60x120) cm K

A

Tenaga

L.01

0.15

OH

Pekerja

L.02

0.45

OH

Tukang Kayu

L.03

0.045

OH

Kepala Tukang

L.04

0.008

OH

Mandor

B

Bahan

0.028

m3

Kayu klas II (Kamfer), balok

0.15

Kg

Paku Biasa 2" - 5"

C

PERALATAN

D

Jumlah A + B + C

432/257

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

24

25

SNI

KODE

A.4.6.1.24

URAIAN PEKERJAAN

SAT.

1

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Dinding Pemisah Teakwood Rangkap Ra

A

Tenaga

L.01

0.15

OH

Pekerja

L.02

0.45

OH

Tukang Kayu

L.03

0.045

OH

Kepala Tukang

L.04

0.008

OH

Mandor

B

Bahan

A.4.6.1.25

414275883.xlsx

KOEF

0.028

m3

Kayu klas II (Kamfer), balok

0.15

Kg

Paku Biasa 2" - 5"

0.86

Lbr

Teakwood 120 x 240 cm tebal 4mm

0.56

Ltr

Lem

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding Pemisah Plywood Rangkap Ran

A

Tenaga

L.01

0.020

OH

Pekerja

L.02

0.600

OH

Tukang Kayu

L.03

0.060

OH

Kepala Tukang

L.04

0.010

OH

Mandor

B

Bahan

0.028

m3

Kayu klas II (Kamfer), balok

0.15

Kg

Paku Biasa 2" - 5"

0.86

Lbr

Plywood 120 x 240 cm tebal 4mm

0.56

Ltr

Lem

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/258

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

26

A.4.6.1.26

27

28

KODE

URAIAN PEKERJAAN

SAT. 1

m2

Pemasangan Dinding Lambriziring dari Papan klas I

A

Tenaga

L.01

0.6

OH

Pekerja

L.02

1.8

OH

Tukang Kayu

L.03

0.18

OH

Kepala Tukang

L.04

0.03

OH

Mandor

B

Bahan

A.4.6.1.27

0.007

m3

Kayu klas I (Jati), papan

0.1

Kg

Paku Biasa 2" - 5"

0.15

Kg

Paku Sekrup 3,5"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding Lambriziring dari Plywood ukur

A

Tenaga

L.01

0.025

OH

Pekerja

L.02

0.075

OH

Tukang Kayu

L.03

0.0080

OH

Kepala Tukang

L.04

0.0010

OH

Mandor

B

Bahan

A.4.6.1.28

414275883.xlsx

KOEF

0.4

Lbr

Plywood (120 X 240) cm x 4mm

0.05

Kg

Paku Biasa 1/2" - 1"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding Bilik, Rangka Kayu Klas III atau I

A

Tenaga

L.01

0.1

OH

Pekerja

L.02

0.05

OH

Tukang Kayu

L.03

0.005

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

1.500

m2

Bilik Bambu

0.014

m3

Kayu Klas III (Meranti)

0.012

Kg

Paku Biasa 1/2" - 1"

432/259

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

No.

SNI

KODE

KOEF 0.003

414275883.xlsx

URAIAN PEKERJAAN

SAT. m'

List Kayu 2/4

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/260

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

URAIAN PEKERJAAN

masangan Kosen Pintu & Jendela Kayu klas I

26,851,000.00 2,373,000.00 57,000.00

399,000.00

84,000.00

1,764,000.00

87,000.00

182,700.00

78,000.00

27,300.00 22,037,000.00

20,000,000.00

22,000,000.00

14,000.00

17,500.00

19,500.00

19,500.00 24,410,000.00 2,441,000.00

10%

26,851,000.00

masangan Kosen Pintu & Jendela Kayu klas II atau III

11,518,100.00 2,034,000.00 57,000.00

342,000.00

84,000.00

1,512,000.00

87,000.00

156,600.00

78,000.00

23,400.00 8,437,000.00

7,000,000.00

8,400,000.00

14,000.00

17,500.00

19,500.00

19,500.00 10,471,000.00 1,047,100.00

10%

11,518,100.00

masangan Pintu KlampStandard Kayu Klas II (Kayu Kamfer)

465,727.90 118,689.00 57,000.00

19,950.00

84,000.00

88,200.00

87,000.00

9,135.00

78,000.00

1,404.00 304,700.00

7,600,000.00 414275883.xlsx

432/261

304,000.00 abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

URAIAN PEKERJAAN

14,000.00

700.00 423,389.00 42,338.90

10%

465,727.90

masangan Daun Pintu Klamp Sederhana Kayu Klas III

465,727.90 118,689.00 57,000.00

19,950.00

84,000.00

88,200.00

87,000.00

9,135.00

78,000.00

1,404.00 304,700.00

7,600,000.00

304,000.00

14,000.00

700.00 423,389.00 42,338.90

10%

465,727.90

masangan Daun Pintu Panel, Kayu Klas I atau II

708,372.50 339,000.00 57,000.00

57,000.00

84,000.00

252,000.00

87,000.00

26,100.00

78,000.00

3,900.00 304,975.00

7,600,000.00

304,000.00

19,500.00

975.00 643,975.00 64,397.50

10%

708,372.50

414275883.xlsx

432/262

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

URAIAN PEKERJAAN

masangan Pintu & Jendela Kaca Kayu Klas I atau II

505,395.00 271,200.00 57,000.00

45,600.00

84,000.00

201,600.00

87,000.00

20,880.00

78,000.00

3,120.00 188,250.00

7,600,000.00

182,400.00

19,500.00

5,850.00 459,450.00 45,945.00

10%

505,395.00

masangan Pintu & Jendela Jalusi Kayu Klas I atau II (jati)

1,932,425.00 339,000.00 57,000.00

57,000.00

84,000.00

252,000.00

87,000.00

26,100.00

78,000.00

3,900.00 1,417,750.00

22,000,000.00

1,408,000.00

19,500.00

9,750.00 1,756,750.00 175,675.00

10%

1,932,425.00

angan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 c

553,817.00 237,300.00

57,000.00

39,900.00

84,000.00

176,400.00

87,000.00

18,270.00

78,000.00

2,730.00 266,170.00

414275883.xlsx

7,600,000.00

190,000.00

14,000.00

420.00

19,500.00

9,750.00

66,000.00

66,000.00

432/263

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

503,470.00 50,347.00

10%

553,817.00

asangan Pintu Plywood rangkap, rangka expose kayu klas I atau II

596,123.00 271,200.00

57,000.00

45,600.00

84,000.00

201,600.00

87,000.00

20,880.00

78,000.00

3,120.00 270,730.00

7,600,000.00

194,560.00

14,000.00

420.00

19,500.00

9,750.00

66,000.00

66,000.00 541,930.00 54,193.00

10%

596,123.00

masangan Jalusi mati Kosen Kayu Klas I atau II

1,729,002.00 249,720.00 57,000.00

38,190.00

84,000.00

168,000.00

87,000.00

17,400.00

78,000.00

26,130.00 1,322,100.00

22,000,000.00

1,320,000.00

14,000.00

2,100.00 1,571,820.00 157,182.00

10%

1,729,002.00

414275883.xlsx

432/264

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

masangan Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I

982,817.00 271,200.00

57,000.00

45,600.00

84,000.00

201,600.00

87,000.00

20,880.00

78,000.00

3,120.00 622,270.00

22,000,000.00

550,000.00

14,000.00

420.00

19,500.00

5,850.00

66,000.00

66,000.00 893,470.00 89,347.00

10%

982,817.00

angan Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II

639,285.90 288,189.00

57,000.00

48,450.00

84,000.00

214,200.00

87,000.00

22,185.00

78,000.00

3,354.00 292,980.00

7,600,000.00

190,000.00

14,000.00

420.00

19,500.00

1,560.00

66,000.00

66,000.00

70,000.00

35,000.00 581,169.00 58,116.90

10%

639,285.90

asang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6

10,254,090.00 1,356,000.00

414275883.xlsx

57,000.00

228,000.00

84,000.00

1,008,000.00

87,000.00

104,400.00

78,000.00

15,600.00

432/265

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 7,965,900.00

7,000,000.00

7,700,000.00

12,500.00

187,500.00

14,000.00

78,400.00 9,321,900.00 932,190.00

10%

10,254,090.00

asangan Konstruksi Kuda-kuda Expose, Kayu Klas I

29,190,920.00 2,271,300.00 57,000.00

381,900.00

84,000.00

1,688,400.00

87,000.00

174,870.00

78,000.00

26,130.00 24,265,900.00

20,000,000.00

24,000,000.00

12,500.00

187,500.00

14,000.00

78,400.00 26,537,200.00 2,653,720.00

10%

29,190,920.00

struksi Gording, Kayu Klas II

9,617,410.00 813,600.00 57,000.00

136,800.00

84,000.00

604,800.00

87,000.00

62,640.00

78,000.00

9,360.00 7,929,500.00

7,000,000.00

7,700,000.00

12,500.00

187,500.00

14,000.00

42,000.00 8,743,100.00 874,310.00

10%

9,617,410.00

414275883.xlsx

432/266

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

gka Atap Genteng Keramik, Kayu Klas II

156,266.00 15,360.00 57,000.00

5,700.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

390.00 126,700.00

7,000,000.00

98,000.00

7,000,000.00

25,200.00

14,000.00

3,500.00 142,060.00 14,206.00

10%

156,266.00

gka Atap Genteng Beton, Kayu Klas II

183,986.00 15,360.00 57,000.00

5,700.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

390.00 151,900.00

7,000,000.00

98,000.00

7,000,000.00

50,400.00

14,000.00

3,500.00 167,260.00 16,726.00

10%

183,986.00

gka Atap Sirap, Kayu Klas II

131,155.20 18,432.00 57,000.00

6,840.00

84,000.00

10,080.00

87,000.00

1,044.00

78,000.00

468.00 100,800.00

7,000,000.00 414275883.xlsx

432/267

98,000.00 abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

14,000.00

2,800.00 119,232.00 11,923.20

10%

131,155.20

gka Langit-langit (50x1,00) m, kayu Klas II atau III

168,091.00 42,210.00 57,000.00

8,550.00

84,000.00

25,200.00

87,000.00

2,610.00

78,000.00

5,850.00 110,600.00

7,000,000.00

107,800.00

14,000.00

2,800.00 152,810.00 15,281.00

10%

168,091.00

gka Langit-langit (60x60) cm, kayu Klas II atau III

173,349.00 39,990.00 57,000.00

11,400.00

84,000.00

25,200.00

87,000.00

2,610.00

78,000.00

780.00 117,600.00

7,000,000.00

114,100.00

14,000.00

3,500.00 157,590.00 15,759.00

10%

173,349.00

414275883.xlsx

432/268

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

URAIAN PEKERJAAN

plank Uk. (3x20)cm Kayu klas I atau II

289,993.00 24,630.00 57,000.00

5,700.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

390.00 239,000.00

22,000,000.00

237,600.00

14,000.00

1,400.00 263,630.00 26,363.00

10%

289,993.00

plank Uk. (3x30)cm Kayu klas I atau klas II

119,823.00 24,630.00 57,000.00

5,700.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

390.00 84,300.00

7,600,000.00

83,600.00

14,000.00

700.00 108,930.00 10,893.00

10%

119,823.00

gka Dinding Pemisah (60x120) cm Kayu klas II atau III

273,887.90 50,889.00 57,000.00

8,550.00

84,000.00

37,800.00

87,000.00

3,915.00

78,000.00

624.00 198,100.00

7,000,000.00

196,000.00

14,000.00

2,100.00 248,989.00

414275883.xlsx

432/269

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

URAIAN PEKERJAAN

24,898.90

10%

273,887.90

ding Pemisah Teakwood Rangkap Rangka Kayu Klas II

348,335.90 50,889.00 57,000.00

8,550.00

84,000.00

37,800.00

87,000.00

3,915.00

78,000.00

624.00 265,780.00

7,000,000.00

196,000.00

14,000.00

2,100.00

66,000.00

56,760.00

19,500.00

10,920.00 316,669.00 31,666.90

10%

348,335.90

ding Pemisah Plywood Rangkap Rangka Kayu Klas II

355,652.00 57,540.00 57,000.00

1,140.00

84,000.00

50,400.00

87,000.00

5,220.00

78,000.00

780.00 265,780.00

7,000,000.00

196,000.00

14,000.00

2,100.00

66,000.00

56,760.00

19,500.00

10,920.00 323,320.00 32,332.00

10%

355,652.00

414275883.xlsx

432/270

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

URAIAN PEKERJAAN

ding Lambriziring dari Papan klas I

395,917.50 203,400.00 57,000.00

34,200.00

84,000.00

151,200.00

87,000.00

15,660.00

78,000.00

2,340.00 156,525.00

22,000,000.00

154,000.00

14,000.00

1,400.00

7,500.00

1,125.00 359,925.00 35,992.50

10%

395,917.50

ding Lambriziring dari Plywood ukuran (120x240) cm

37,838.90 8,499.00 57,000.00

1,425.00

84,000.00

6,300.00

87,000.00

696.00

78,000.00

78.00 25,900.00

63,000.00

25,200.00

14,000.00

700.00 34,399.00 3,439.90

10%

37,838.90

ding Bilik, Rangka Kayu Klas III atau IV

120,458.14 10,725.00 57,000.00

5,700.00

84,000.00

4,200.00

87,000.00

435.00

78,000.00

390.00 98,782.40

414275883.xlsx

20,000.00

30,000.00

4,900,000.00

68,600.00

14,000.00

168.00

432/271

abk 6-14

file:///conversion/tmp/scratch/414275883.xlsx

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

4,800.00

14.40 109,507.40 10,950.74

10%

120,458.14

414275883.xlsx

432/272

abk 6-14

No.

SNI

VII

A.4.1.1

1

A.4.1.1.1

KODE

3

1

m3 A

Tenaga

1.65

OH

Pekerja

L.02

0.275

OH

Tukang Batu

L.03

0.028

OH

Kepala Tukang

L.04

0.083

OH

Mandor

B

Bahan

247

Kg

Portland Semen

869

Kg

Pasir Beton

999

Kg

Kerikil (maksimum 30 mm)

215

ltr

Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m3 A

Tenaga

1.65

OH

Pekerja

L.02

0.28

OH

Tukang Batu

L.03

0.03

OH

Kepala Tukang

L.04

0.08

OH

Mandor

B

Bahan

276

Kg

Portland Semen

828

kg

Pasir Beton

1,012

kg

Kerikil (maksimum 30 mm)

215

ltr

Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m3

10%

Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78

L.01

1.00

BETON

Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87

L.01

A.4.1.1.3

414275883.xlsx

URAIAN PEKERJAAN

SAT.

HARGA SATUAN PEKERJAAN

A.4.1.1.2

2

KOEF

10%

Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72

A

Tenaga

L.01

1.65

OH

Pekerja

L.02

0.28

OH

Tukang Batu

L.03

0.03

OH

Kepala Tukang

L.04

0.08

OH

Mandor

B

Bahan

299

Kg

Portland Semen

799

kg

Pasir Beton 432/273

abk 7-14

No.

4

5

SNI

KODE

A.4.1.1.4

URAIAN PEKERJAAN

SAT.

1,017

kg

Kerikil (maksimum 30 mm)

215

ltr

Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1.00

m3 A

Tenaga

1.200

OH

Pekerja

L.02

0.200

OH

Tukang Batu

L.03

0.020

OH

Kepala Tukang

L.04

0.006

OH

Mandor

B

Bahan

230

Kg

Portland Semen

893

kg

Pasir Beton

1,027

kg

Kerikil (maksimum 30 mm)

200

ltr

Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m3

10%

Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm,

L.01

A.4.1.1.5

414275883.xlsx

KOEF

10%

Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66

A

Tenaga

L.01

1.65

OH

Pekerja

L.02

0.275

OH

Tukang Batu

L.03

0.028

OH

Kepala Tukang

L.04

0.083

OH

Mandor

B

Bahan

326

Kg

Portland Semen

760

Kg

Pasir Beton

1,029

Kg

Kerikil (maksimum 30 mm)

215

ltr

Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/274

10%

abk 7-14

No.

SNI

6

A.4.1.1.6

7

8

KODE

1

SAT.

URAIAN PEKERJAAN

m3

Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61

A

Tenaga

L.01

1.650

OH

Pekerja

L.02

0.275

OH

Tukang Batu

L.03

0.028

OH

Kepala Tukang

L.04

0.083

OH

Mandor

B

Bahan

352

Kg

Portland Semen

731

Kg

Pasir Beton

1,031

Kg

Kerikil (maksimum 30 mm)

215

ltr

Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.1.1.7

1

m3 A

Tenaga

1.650

OH

Pekerja

L.02

0.275

OH

Tukang Batu

L.03

0.028

OH

Kepala Tukang

L.04

0.083

OH

Mandor

B

Bahan

371

Kg

Portland Semen

698

Kg

Pasir Beton

1,047

Kg

Kerikil (maksimum 30 mm)

215

ltr

Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m3

10%

Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56

A

Tenaga

L.01

1.650

OH

Pekerja

L.02

0.275

OH

Tukang Batu

L.03

0.028

OH

Kepala Tukang

L.04

0.083

OH

Mandor

B

Bahan

Kg

Portland Semen

384

10%

Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58

L.01

A.4.1.1.8

414275883.xlsx

KOEF

432/275

abk 7-14

No.

9

10

SNI

KODE

A.4.1.1.9

URAIAN PEKERJAAN

SAT.

692

Kg

Pasir Beton

1,039

Kg

Kerikil (maksimum 30 mm)

215

ltr

Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m3 A

Tenaga

1.650

OH

Pekerja

L.02

0.275

OH

Tukang Batu

L.03

0.028

OH

Kepala Tukang

L.04

0.083

OH

Mandor

B

Bahan

406

Kg

Portland Semen

684

kg

Pasir Beton

1,026

kg

Kerikil (maksimum 30 mm)

215

ltr

Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m3

10%

Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)c

L.01

A.4.1.1.10

414275883.xlsx

KOEF

10%

Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52

A

Tenaga

L.01

1.650

OH

Pekerja

L.02

0.275

OH

Tukang Batu

L.03

0.028

OH

Kepala Tukang

L.04

0.083

OH

Mandor

B

Bahan

413

Kg

Portland Semen

681

Kg

Pasir Beton

1,021

Kg

Kerikil (maksimum 30 mm)

215

ltr

Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/276

10%

abk 7-14

No.

SNI

11

A.4.1.1.11

12

13

KODE

1

SAT.

URAIAN PEKERJAAN

m3

Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49

A

Tenaga

L.01

2.1

OH

Pekerja

L.02

0.35

OH

Tukang Batu

L.03

0.035

OH

Kepala Tukang

L.04

0.105

OH

Mandor

B

Bahan

439

Kg

Portland Semen

670

Kg

Pasir Beton

1,006

Kg

Kerikil (maksimum 30 mm)

215

ltr

Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.1.1.12

1

m3 A

Tenaga

2.10

OH

Pekerja

L.02

0.350

OH

Tukang Batu

L.03

0.035

OH

Kepala Tukang

L.04

0.105

OH

Mandor

B

Bahan

448

Kg

Portland Semen

667

Kg

Pasir Beton

1,000

Kg

Kerikil (maksimum 30 mm)

215

ltr

Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

10

Kg

10%

Pembesian dg Besi Polos atau Besi Ulir

A

Tenaga

L.01

0.07

OH

Pekerja

L.02

0.07

OH

Tukang Besi

L.03

0.007

OH

Kepala Tukang

L.04

0.004

OH

Mandor

B

Bahan

Kg

Besi Beton (polos/ulir)

10.50

10%

Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48

L.01

A.4.1.1.17

414275883.xlsx

KOEF

432/277

abk 7-14

No.

SNI

KODE

KOEF 0.150

14

15

16

A.4.1.1.18

10

Kg

Kawat Beton

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

Kg A

Tenaga

0.05

OH

Pekerja

L.02

0.05

OH

Tukang Besi

L.03

0.005

OH

Kepala Tukang

L.04

0.003

OH

Mandor

B

Bahan

10.5

Kg

Besi presstred polos

0.1

Kg

Kawat Beton

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

Kg

Jaring Kawat baja/Wire Mesh

10

A

Tenaga

L.01

0.025

OH

Pekerja

L.02

0.025

OH

Tukang Besi

L.03

0.002

OH

Kepala Tukang

L.04

0.001

OH

Mandor

B

Bahan

10.20

Kg

Jaring Kawat Baja dilas

0.05

Kg

Kawat Beton

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.1.1.20

1

m2

10%

Kabel Presstresed Polos/strand

L.01

A.4.1.1.19

414275883.xlsx

URAIAN PEKERJAAN

SAT.

10%

10%

Memasang Bekisting untuk Pondasi

A

Tenaga

L.01

0.52

OH

Pekerja

L.02

0.26

OH

Tukang Kayu

432/278

abk 7-14

No.

17

18

SNI

KODE

URAIAN PEKERJAAN

SAT.

L.03

0.026

OH

Kepala Tukang

L.04

0.026

OH

Mandor

B

Bahan

A.4.1.1.21

0.04

m3

Kayu Klas III (Terentang)

0.3

Kg

Paku Biasa 2" - 5"

0.1

Ltr

Minyak Bekisting

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2 A

Tenaga

0.52

OH

Pekerja

L.02

0.26

OH

Tukang Kayu

L.03

0.026

OH

Kepala Tukang

L.04

0.026

OH

Mandor

B

Bahan

0.045

m3

Kayu Klas III (Terentang)

0.3

Kg

Paku Biasa 2" - 5"

0.1

Ltr

Minyak Bekisting

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

10%

Memasang Bekisting untuk Kolom

A

Tenaga

L.01

0.66

OH

Pekerja

L.02

0.33

OH

Tukang Kayu

L.03

0.033

OH

Kepala Tukang

L.04

0.033

OH

Mandor

B

Bahan

0.04

m3

Kayu Klas III (Terentang)

0.4

Kg

Paku Biasa 2" - 5"

0.2

Ltr

Minyak Bekisting

0.015

m3

Balok Kayu Klas II

0.35

Lbr

Plywood tebal 9mm

2

Btg

Dolken Kayu Galam diameter 8 - 10 cm / 4 m

C

10%

Memasang Bekisting untuk Sloof

L.01

A.4.1.1.22

414275883.xlsx

KOEF

PERALATAN 432/279

abk 7-14

No.

19

20

SNI

KODE

A.4.1.1.23

URAIAN PEKERJAAN

SAT.

1

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2 A

Tenaga

0.66

OH

Pekerja

L.02

0.33

OH

Tukang Kayu

L.03

0.033

OH

Kepala Tukang

L.04

0.033

OH

Mandor

B

Bahan

0.04

m3

Kayu Klas III (Terentang)

0.4

Kg

Paku Biasa 2" - 5"

0.2

Ltr

Minyak Bekisting

0.018

m3

Balok Kayu Klas II

0.35

Lbr

Plywood tebal 9mm

2

Btg

Dolken Kayu Galam diameter 8 - 10 cm / 4 m

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

10%

Memasang Bekisting untuk Balok

L.01

A.4.1.1.24

414275883.xlsx

KOEF

10%

Memasang Bekisting untuk Lantai

A

Tenaga

L.01

0.66

OH

Pekerja

L.02

0.33

OH

Tukang Kayu

L.03

0.033

OH

Kepala Tukang

L.04

0.033

OH

Mandor

B

Bahan

0.04

m3

Kayu Klas III (Terentang)

0.4

Kg

Paku Biasa 2" - 5"

0.2

Ltr

Minyak Bekisting

0.015

m3

Balok Kayu Klas II (Borneo)

0.35

Lbr

Plywood tebal 9mm

6

Btg

Dolken Kayu Galam diameter 8 - 10 cm / 4 m

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

432/280

10%

abk 7-14

No.

SNI

KODE

KOEF

F 21

A.4.1.1.25

URAIAN PEKERJAAN

SAT.

1

m2

Harga Satuan Pekerjaan (D+E) Memasang Bekisting untuk Dinding

A

Tenaga

L.01

0.66

OH

Pekerja

L.02

0.33

OH

Tukang Kayu

L.03

0.033

OH

Kepala Tukang

L.04

0.033

OH

Mandor

B

Bahan

0.03

m3

Kayu Klas III (Terentang)

0.4

Kg

Paku Biasa 2" - 5"

0.2

Ltr

Minyak Bekisting

0.02

m3

Balok Kayu Klas II

0.35

Lbr

Plywood tebal 9mm

3

Btg

Dolken Kayu Galam diameter 8 - 10 cm / 4 m

4 Buah Formite/Penjaga jarak / Spacer (alat bantu)

22

23

A.4.1.1.26

A.4.1.1.27

414275883.xlsx

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Memasang Bekisting untuk Tangga

A

Tenaga

L.01

0.66

OH

Pekerja

L.02

0.33

OH

Tukang Kayu

L.03

0.033

OH

Kepala Tukang

L.04

0.033

OH

Mandor

B

Bahan

0.03

m3

Kayu Klas III (Terentang)

0.4

Kg

Paku Biasa 2" - 5"

0.15

Ltr

Minyak Bekisting

0.015

m3

Balok Kayu Klas II

0.35

Lbr

Plywood tebal 9mm

2

Btg

Dolken Kayu Galam diameter 8 - 10 cm / 4 m

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

10%

10%

Memasang Jembatan Cor 432/281

abk 7-14

No.

24

25

SNI

KODE

414275883.xlsx

URAIAN PEKERJAAN

SAT. A

Tenaga

L.01

0.15

OH

Pekerja

L.02

0.05

OH

Tukang Kayu

L.03

0.005

OH

Kepala Tukang

L.04

0.008

OH

Mandor

B

Bahan

A.4.1.1.28

A.4.1.1.29

KOEF

0.0264

m3

Kayu Terentang

0.6

kg

Paku Biasa 2" - 5"

0.5

m3

Dolken Kayu Galam diameter 8 - 10 / 4 m

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m3

Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)

A

Tenaga

L.01

5.3

OH

Pekerja

L.02

0.275

OH

Tukang batu

L.02

1.30

OH

Tukang Kayu

L.02

1.05

OH

Tukang Besi

L.03

0.262

OH

Kepala Tukang

L.04

0.265

OH

Mandor

B

Bahan

0.2

m3

Kayu Klas III (Terentang)

1.5

Kg

Paku Biasa 2" - 5"

0.4

Ltr

Minyak Bekisting

157.5

Kg

Besi Beton Polos

2.25

Kg

Kawat Beton

336

Kg

Portland Semen

0.54

m3

Pasir Beton

0.81

m3

Kerikil Beton

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m3 A

10%

10%

Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) Tenaga

432/282

abk 7-14

No.

26

SNI

KODE

URAIAN PEKERJAAN

SAT.

L.01

5.65

OH

Pekerja

L.02

0.275

OH

Tukang batu

L.02

1.56

OH

Tukang Kayu

L.02

1.4

OH

Tukang Besi

L.03

0.323

OH

Kepala Tukang

L.04

0.283

OH

Mandor

B

Bahan

A.4.1.1.30

414275883.xlsx

KOEF

0.27

m3

Kayu Klas III (Terentang)

2

Kg

Paku Biasa 2" - 5"

0.6

Ltr

Minyak Bekisting

210

Kg

Besi Beton Polos

3

Kg

Kawat Beton

336

Kg

Portland Semen

0.54

m3

Pasir Beton

0.81

m3

Kerikil Beton

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m3

10%

Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)

A

Tenaga

L.01

7.05

OH

Pekerja

L.02

0.275

OH

Tukang batu

L.02

1.65

OH

Tukang Kayu

L.02

2.1

OH

Tukang Besi

L.03

0.403

OH

Kepala Tukang

L.04

0.353

OH

Mandor

B

Bahan

0.4

m3

Kayu Klas III (Terentang)

4

Kg

Paku Biasa 2" - 5"

2

Ltr

Minyak Bekisting

315

kg

Besi Beton Polos

4.5

kg

Kawat Beton

336

Kg

Portland Semen

0.54

m3

Pasir Beton

0.81

m3

Kerikil Beton

0.15

m3

Kayu Klas II Balok

3.5

Lbr

Plywood 9 mm

20

Btg

Dolken diameter 8 / 4rm 432/283

abk 7-14

No.

27

28

SNI

KODE

A.4.1.1.31

URAIAN PEKERJAAN

SAT.

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m3 A

Tenaga

6.35

OH

Pekerja

L.02

0.275

OH

Tukang batu

L.02

1.65

OH

Tukang Kayu

L.02

1.4

OH

Tukang Besi

L.03

0.333

OH

Kepala Tukang

L.04

0.318

OH

Mandor

B

Bahan

0.32

m3

Kayu Klas III (Terentang)

3.2

Kg

Paku Biasa 2" - 5"

1.6

Ltr

Minyak Bekisting

210

Kg

Besi Beton Polos

3

Kg

Kawat Beton

336

Kg

Portland Semen

0.54

m3

Pasir Beton

0.81

m3

Kerikil Beton

0.14

m3

Kayu Klas II Balok

2.8

Lbr

Plywood 9 mm

16

Btg

Dolken diameter 8 / 4rm

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m3

10%

Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)

L.01

A.4.1.1.32

414275883.xlsx

KOEF

10%

Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)

A

Tenaga

L.01

5.3

OH

Pekerja

L.02

0.275

OH

Tukang batu

L.02

1.3

OH

Tukang Kayu

L.02

1.05

OH

Tukang Besi

L.03

0.265

OH

Kepala Tukang

L.04

0.265

OH

Mandor

432/284

abk 7-14

No.

SNI

KODE

KOEF

B

29

A.4.1.1.33

414275883.xlsx

URAIAN PEKERJAAN

SAT. Bahan

0.32

m3

Kayu Klas III (Terentang)

3.2

Kg

Paku Biasa 2" - 5"

1.6

Ltr

Minyak Bekisting

157.5

Kg

Besi Beton Polos

2.25

Kg

Kawat Beton

336

Kg

Portland Semen

0.54

m3

Pasir Beton

0.81

m3

Kerikil Beton

0.12

m3

Kayu Klas II Balok

2.8

Lbr

Plywood 9 mm

32

Btg

Dolken diameter 8 / 4rm

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m3

10%

Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)

A

Tenaga

L.01

5.3

OH

Pekerja

L.02

0.275

OH

Tukang batu

L.02

1.3

OH

Tukang Kayu

L.02

1.05

OH

Tukang Besi

L.03

0.262

OH

Kepala Tukang

L.04

0.265

OH

Mandor

B

Bahan

0.24

m3

Kayu Klas III (Terentang)

3.2

Kg

Paku Biasa 2" - 5"

1.6

Ltr

Minyak Bekisting

157.5

Kg

Besi Beton Polos

2.25

Kg

Kawat Beton

336

Kg

Portland Semen

0.54

m3

Pasir Beton

0.81

m3

Kerikil Beton

0.16

m3

Kayu Klas II Balok

2.8

Lbr

Plywood 9 mm

24

Btg

Dolken diameter 8 / 4rm

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%) 432/285

10%

abk 7-14

No.

SNI

KODE

KOEF

F 30

31

A.4.1.1.34

1

m3

Harga Satuan Pekerjaan (D+E) Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)

A

Tenaga

L.01

5.65

OH

Pekerja

L.02

0.275

OH

Tukang batu

L.02

1.56

OH

Tukang Kayu

L.02

1.4

OH

Tukang Besi

L.03

0.323

OH

Kepala Tukang

L.04

0.283

OH

Mandor

B

Bahan

A.4.1.1.35

414275883.xlsx

URAIAN PEKERJAAN

SAT.

0.25

m3

Kayu Klas III (Terentang)

3

Kg

Paku Biasa 2" - 5"

1.2

Ltr

Minyak Bekisting

210

Kg

Besi Beton Polos

3

Kg

Kawat Beton

336

Kg

Portland Semen

0.54

m3

Pasir Beton

0.81

m3

Kerikil Beton

0.105

m3

Kayu Klas II Balok

2.5

Lbr

Plywood 9 mm

14

Btg

Dolken diameter 8 / 4rm

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Membuat Kolom Penguat Beton Bertulang (11 x 11) cm

A

Tenaga

L.01

0.18

OH

Pekerja

L.02

0.02

OH

Tukang batu

L.02

0.02

OH

Tukang Kayu

L.02

0.02

OH

Tukang Besi

L.03

0.006

OH

Kepala Tukang

L.04

0.009

OH

Mandor

B

Bahan

0.002

m3

Kayu Klas III (Terentang)

0.01

Kg

Paku Biasa 2" - 5"

3

Kg

Besi Beton Polos

0.045

Kg

Kawat Beton 432/286

10%

abk 7-14

No.

32

SNI

KODE

A.4.1.1.36

414275883.xlsx

KOEF

URAIAN PEKERJAAN

SAT. 4

Kg

Portland Semen

0.006

m3

Pasir Beton

0.009

m3

Kerikil Beton

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Membuat Ring Balok Beton Bertulang (10 x 15) cm

A

Tenaga

1 L.01

0.297

OH

Pekerja

L.02

0.033

OH

Tukang batu

L.02

0.033

OH

Tukang Kayu

L.02

0.033

OH

Tukang Besi

L.03

0.01

OH

Kepala Tukang

L.04

0.015

OH

Mandor

B

Bahan

0.003

m3

Kayu Klas III (Terentang)

0.02

Kg

Paku Biasa 2" - 5"

3.6

Kg

Besi Beton Polos

0.05

Kg

Kawat Beton

5.5

Kg

Portland Semen

0.009

m3

Pasir Beton

0.015

m3

Kerikil Beton

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/287

10%

10%

abk 7-14

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

923,395.00 126,060.00 57,000.00

94,050.00

84,000.00

23,100.00

87,000.00

2,436.00

78,000.00

6,474.00 713,390.00

1,360.00

335,920.00

200.00

173,800.00

200.00

199,800.00

18.00

3,870.00 839,450.00 83,945.00 923,395.00 960,619.00 126,060.00

57,000.00

94,050.00

84,000.00

23,100.00

87,000.00

2,436.00

78,000.00

6,474.00 747,230.00

1,360.00

375,360.00

200.00

165,600.00

200.00

202,400.00

18.00

3,870.00 873,290.00 87,329.00 960,619.00

2 Mpa (K150), slum (12±2)cm, w/c = 0,72

414275883.xlsx

989,747.00 126,060.00 57,000.00

94,050.00

84,000.00

23,100.00

87,000.00

2,436.00

78,000.00

6,474.00 773,710.00

1,360.00

406,640.00

200.00

159,800.00

432/288

abk 7-14

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 200.00

203,400.00

18.00

3,870.00 899,770.00 89,977.00 989,747.00

mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87

866,588.80 87,408.00

57,000.00

68,400.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

468.00 700,400.00

1,360.00

312,800.00

200.00

178,600.00

200.00

205,400.00

18.00

3,600.00 787,808.00 78,780.80 866,588.80

5 MPa (K175), slum (12±2)cm, w/c = 0,66

414275883.xlsx

1,024,199.00 126,060.00 57,000.00

94,050.00

84,000.00

23,100.00

87,000.00

2,436.00

78,000.00

6,474.00 805,030.00

1,360.00

443,360.00

200.00

152,000.00

200.00

205,800.00

18.00

3,870.00 931,090.00 93,109.00 1,024,199.00

432/289

abk 7-14

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

9 MPa (K200), slum (12±2)cm, w/c = 0,61

1,057,155.00 126,060.00 57,000.00

94,050.00

84,000.00

23,100.00

87,000.00

2,436.00

78,000.00

6,474.00 834,990.00

1,360.00

478,720.00

200.00

146,200.00

200.00

206,200.00

18.00

3,870.00 961,050.00 96,105.00 1,057,155.00

3 MPa (K225), slum (12±2)cm, w/c = 0,58

1,081,839.00 126,060.00 57,000.00

94,050.00

84,000.00

23,100.00

87,000.00

2,436.00

78,000.00

6,474.00 857,430.00

1,360.00

504,560.00

200.00

139,600.00

200.00

209,400.00

18.00

3,870.00 983,490.00 98,349.00 1,081,839.00

7 MPa (K250), slum (12±2)cm, w/c = 0,56

414275883.xlsx

1,098,207.00 126,060.00 57,000.00

94,050.00

84,000.00

23,100.00

87,000.00

2,436.00

78,000.00

6,474.00 872,310.00

1,360.00 432/290

522,240.00

abk 7-14

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 200.00

138,400.00

200.00

207,800.00

18.00

3,870.00 998,370.00 99,837.00 1,098,207.00

mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53

1,126,499.00 126,060.00

57,000.00

94,050.00

84,000.00

23,100.00

87,000.00

2,436.00

78,000.00

6,474.00 898,030.00

1,360.00

552,160.00

200.00

136,800.00

200.00

205,200.00

18.00

3,870.00 1,024,090.00 102,409.00 1,126,499.00

4 MPa (K300), slum (12±2)cm, w/c = 0,52

414275883.xlsx

1,135,211.00 126,060.00 57,000.00

94,050.00

84,000.00

23,100.00

87,000.00

2,436.00

78,000.00

6,474.00 905,950.00

1,360.00

561,680.00

200.00

136,200.00

200.00

204,200.00

18.00

3,870.00 1,032,010.00 103,201.00 1,135,211.00

432/291

abk 7-14

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

8 MPa (K325), slum (12±2)cm, w/c = 0,49

1,206,089.50 160,335.00 57,000.00

119,700.00

84,000.00

29,400.00

87,000.00

3,045.00

78,000.00

8,190.00 936,110.00

1,360.00

597,040.00

200.00

134,000.00

200.00

201,200.00

18.00

3,870.00 1,096,445.00 109,644.50 1,206,089.50

2 MPa (K350), slum (12±2)cm, w/c = 0,48

414275883.xlsx

1,217,573.50 160,335.00 57,000.00

119,700.00

84,000.00

29,400.00

87,000.00

3,045.00

78,000.00

8,190.00 946,550.00

1,360.00

609,280.00

200.00

133,400.00

200.00

200,000.00

18.00

3,870.00 1,106,885.00 110,688.50 1,217,573.50 158,720.10 10,791.00

57,000.00

3,990.00

84,000.00

5,880.00

87,000.00

609.00

78,000.00

312.00 133,500.00

12,500.00 432/292

131,250.00

abk 7-14

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

15,000.00

2,250.00 144,291.00 14,429.10 158,720.10 125,640.90 7,719.00

57,000.00

2,850.00

84,000.00

4,200.00

87,000.00

435.00

78,000.00

234.00 106,500.00

10,000.00

105,000.00

15,000.00

1,500.00 114,219.00 11,421.90 125,640.90 229,379.70 3,777.00

57,000.00

1,425.00

84,000.00

2,100.00

87,000.00

174.00

78,000.00

78.00 204,750.00

20,000.00

204,000.00

15,000.00

750.00 208,527.00 20,852.70 229,379.70 155,034.00 55,770.00

57,000.00

29,640.00

84,000.00

21,840.00

432/293

abk 7-14

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

87,000.00

2,262.00

78,000.00

2,028.00 85,170.00

2,000,000.00

80,000.00

14,000.00

4,200.00

9,700.00

970.00 140,940.00 14,094.00 155,034.00 166,034.00 55,770.00

57,000.00

29,640.00

84,000.00

21,840.00

87,000.00

2,262.00

78,000.00

2,028.00 95,170.00

2,000,000.00

90,000.00

14,000.00

4,200.00

9,700.00

970.00 150,940.00 15,094.00 166,034.00 348,782.50 70,785.00

57,000.00

37,620.00

84,000.00

27,720.00

87,000.00

2,871.00

78,000.00

2,574.00 246,290.00

2,000,000.00

80,000.00

14,000.00

5,600.00

9,700.00

1,940.00

5,500,000.00

82,500.00

115,000.00

40,250.00

18,000.00

36,000.00

432/294

abk 7-14

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 317,075.00 31,707.50 348,782.50 366,932.50 70,785.00

57,000.00

37,620.00

84,000.00

27,720.00

87,000.00

2,871.00

78,000.00

2,574.00 262,790.00

2,000,000.00

80,000.00

14,000.00

5,600.00

9,700.00

1,940.00

5,500,000.00

99,000.00

115,000.00

40,250.00

18,000.00

36,000.00 333,575.00 33,357.50 366,932.50 427,982.50 70,785.00

57,000.00

37,620.00

84,000.00

27,720.00

87,000.00

2,871.00

78,000.00

2,574.00 318,290.00

2,000,000.00

80,000.00

14,000.00

5,600.00

9,700.00

1,940.00

5,500,000.00

82,500.00

115,000.00

40,250.00

18,000.00

108,000.00 389,075.00 38,907.50

432/295

abk 7-14

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 427,982.50 398,832.50 70,785.00

57,000.00

37,620.00

84,000.00

27,720.00

87,000.00

2,871.00

78,000.00

2,574.00 291,790.00

2,000,000.00

60,000.00

14,000.00

5,600.00

9,700.00

1,940.00

5,500,000.00

110,000.00

115,000.00

40,250.00

18,000.00

54,000.00

5,000.00

20,000.00 362,575.00 36,257.50 398,832.50 326,249.00 70,785.00

57,000.00

37,620.00

84,000.00

27,720.00

87,000.00

2,871.00

78,000.00

2,574.00 225,805.00

2,000,000.00

60,000.00

14,000.00

5,600.00

9,700.00

1,455.00

5,500,000.00

82,500.00

115,000.00

40,250.00

18,000.00

36,000.00 296,590.00 29,659.00 326,249.00 92,409.90

432/296

abk 7-14

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 13,809.00

57,000.00

8,550.00

84,000.00

4,200.00

87,000.00

435.00

78,000.00

624.00 70,200.00

2,000,000.00

52,800.00

14,000.00

8,400.00

18,000.00

9,000.00 84,009.00 8,400.90 92,409.90 3,769,209.40 566,064.00

57,000.00

302,100.00

84,000.00

23,100.00

84,000.00

109,200.00

84,000.00

88,200.00

87,000.00

22,794.00

78,000.00

20,670.00 2,860,490.00

2,000,000.00

400,000.00

14,000.00

21,000.00

9,700.00

3,880.00

10,000.00

1,575,000.00

15,000.00

33,750.00

1,360.00

456,960.00

280,000.00

151,200.00

270,000.00

218,700.00 3,426,554.00 342,655.40 3,769,209.40 4,608,609.50 643,965.00

432/297

abk 7-14

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

57,000.00

322,050.00

84,000.00

23,100.00

84,000.00

131,040.00

84,000.00

117,600.00

87,000.00

28,101.00

78,000.00

22,074.00 3,545,680.00

2,000,000.00

540,000.00

14,000.00

28,000.00

9,700.00

5,820.00

10,000.00

2,100,000.00

15,000.00

45,000.00

1,360.00

456,960.00

280,000.00

151,200.00

270,000.00

218,700.00 4,189,645.00 418,964.50 4,608,609.50 8,040,785.50 802,545.00

57,000.00

401,850.00

84,000.00

23,100.00

84,000.00

138,600.00

84,000.00

176,400.00

87,000.00

35,061.00

78,000.00

27,534.00 6,507,260.00

2,000,000.00

800,000.00

14,000.00

56,000.00

9,700.00

19,400.00

10,000.00

3,150,000.00

15,000.00

67,500.00

1,360.00

456,960.00

280,000.00

151,200.00

270,000.00

218,700.00

5,500,000.00

825,000.00

115,000.00

402,500.00

18,000.00

360,000.00

432/298

abk 7-14

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

7,309,805.00 730,980.50 8,040,785.50 6,321,925.50 695,025.00 57,000.00

361,950.00

84,000.00

23,100.00

84,000.00

138,600.00

84,000.00

117,600.00

87,000.00

28,971.00

78,000.00

24,804.00 5,052,180.00

2,000,000.00

640,000.00

14,000.00

44,800.00

9,700.00

15,520.00

10,000.00

2,100,000.00

15,000.00

45,000.00

1,360.00

456,960.00

280,000.00

151,200.00

270,000.00

218,700.00

5,500,000.00

770,000.00

115,000.00

322,000.00

18,000.00

288,000.00 5,747,205.00 574,720.50 6,321,925.50 5,786,280.50 566,325.00

57,000.00

302,100.00

84,000.00

23,100.00

84,000.00

109,200.00

84,000.00

88,200.00

87,000.00

23,055.00

78,000.00

20,670.00

432/299

abk 7-14

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 4,693,930.00

2,000,000.00

640,000.00

14,000.00

44,800.00

9,700.00

15,520.00

10,000.00

1,575,000.00

15,000.00

33,750.00

1,360.00

456,960.00

280,000.00

151,200.00

270,000.00

218,700.00

5,500,000.00

660,000.00

115,000.00

322,000.00

18,000.00

576,000.00 5,260,255.00 526,025.50 5,786,280.50 5,693,593.40 566,064.00

57,000.00

302,100.00

84,000.00

23,100.00

84,000.00

109,200.00

84,000.00

88,200.00

87,000.00

22,794.00

78,000.00

20,670.00 4,609,930.00

2,000,000.00

480,000.00

14,000.00

44,800.00

9,700.00

15,520.00

10,000.00

1,575,000.00

15,000.00

33,750.00

1,360.00

456,960.00

280,000.00

151,200.00

270,000.00

218,700.00

5,500,000.00

880,000.00

115,000.00

322,000.00

18,000.00

432,000.00 5,175,994.00 517,599.40

432/300

abk 7-14

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 5,693,593.40 5,815,111.50 643,965.00

57,000.00

322,050.00

84,000.00

23,100.00

84,000.00

131,040.00

84,000.00

117,600.00

87,000.00

28,101.00

78,000.00

22,074.00 4,642,500.00

2,000,000.00

500,000.00

14,000.00

42,000.00

9,700.00

11,640.00

10,000.00

2,100,000.00

15,000.00

45,000.00

1,360.00

456,960.00

280,000.00

151,200.00

270,000.00

218,700.00

5,500,000.00

577,500.00

115,000.00

287,500.00

18,000.00

252,000.00 5,286,465.00 528,646.50 5,815,111.50 66,977.90 16,524.00

57,000.00

10,260.00

84,000.00

1,680.00

84,000.00

1,680.00

84,000.00

1,680.00

87,000.00

522.00

78,000.00

702.00 44,365.00

2,000,000.00

4,000.00

14,000.00

140.00

10,000.00

30,000.00

15,000.00

675.00

432/301

abk 7-14

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

1,360.00

5,440.00

280,000.00

1,680.00

270,000.00

2,430.00 60,889.00 6,088.90 66,977.90 92,801.50 27,285.00

57,000.00

16,929.00

84,000.00

2,772.00

84,000.00

2,772.00

84,000.00

2,772.00

87,000.00

870.00

78,000.00

1,170.00 57,080.00

2,000,000.00

6,000.00

14,000.00

280.00

10,000.00

36,000.00

15,000.00

750.00

1,360.00

7,480.00

280,000.00

2,520.00

270,000.00

4,050.00 84,365.00 8,436.50 92,801.50

432/302

abk 7-14

No.

SNI

VIII

A.4.5.2

1

A.4.5.2.1

KODE

KOEF

URAIAN PEKERJAAN

SAT.

HARGA SATUAN PEKERJAAN PENUTUP ATAP 1

m2

Pemasangan Atap Genteng Plentong Kecil

A

Tenaga

L.01

0.15

OH

Pekerja

L.02

0.075

OH

Tukang Kayu

L.03

0.0075

OH

Kepala Tukang

L.04

0.008

OH

Mandor

B

Bahan

25

Buah

Genteng Plentong

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%)

2

A.4.5.2.2

1

414275883.xlsx

Pemasangan Atap Genteng Kodok / Glasur

A

Tenaga

L.01

0.15

OH

Pekerja

L.02

0.075

OH

Tukang Kayu

L.03

0.008

OH

Kepala Tukang

L.04

0.008

OH

Mandor

B

Bahan

25

3

m2

A.4.5.2.3

1

Buah

Genteng Kodok / Glasur

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Atap Genteng Plentong Super / Besar

A

Tenaga

L.01

0.15

OH

Pekerja

L.02

0.075

OH

Tukang Kayu

L.03

0.008

OH

Kepala Tukang

432/303

abk 8-14

No.

SNI

KODE L.04

KOEF 0.008

18

4

414275883.xlsx

A.4.5.2.4

URAIAN PEKERJAAN

SAT.

1

OH

Mandor

B

Bahan

Buah

Genteng Plentong Super / Besar

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Genteng Bubung Plentong

A

Tenaga

L.01

0.4

OH

Pekerja

L.02

0.2

OH

Tukang Kayu

L.03

0.02

OH

Kepala Tukang

L.04

0.002

OH

Mandor

B

Bahan

5

Buah

Genteng Bubung Plentong

8

Kg

Portland Semen

0.032

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/304

abk 8-14

No.

SNI

5

A.4.5.2.5

6

7

414275883.xlsx

KODE

KOEF

URAIAN PEKERJAAN

SAT. 1

m'

Pemasangan Genteng Bubung Kodok / Glasur

A

Tenaga

L.01

0.4

OH

Pekerja

L.02

0.2

OH

Tukang Kayu

L.03

0.02

OH

Kepala Tukang

L.04

0.002

OH

Mandor

B

Bahan

A.4.5.2.6

5

Buah

8

Kg

Portland Semen

0.032

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Genteng Bubung Plentong Besar

A

Tenaga

1

Genteng Bubung Kodok / Glasur

L.01

0.4

OH

Pekerja

L.02

0.2

OH

Tukang Kayu

L.03

0.02

OH

Kepala Tukang

L.04

0.002

OH

Mandor

B

Bahan

A.4.5.2.9

4

Buah

8

Kg

Portland Semen

0.032

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

L.01

0.14

m2

Genteng Bubung Plentong Besar

Pemasangan Atap Asbes Gelombang (2,25x0,92 m) x 5 m

A

Tenaga

OH

Pekerja

432/305

abk 8-14

No.

8

414275883.xlsx

SNI

KODE

KOEF

URAIAN PEKERJAAN

SAT.

L.02

0.075

OH

Tukang Kayu

L.03

0.008

OH

Kepala Tukang

L.04

0.008

OH

Mandor

B

Bahan

A.4.5.2.10

0.6

Lbr

Asbes Gelombang

0.12

Kg

Paku Pancing 60 x 230

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Atap Asbes Gelombang (2,00x0,92 m) x 5 m

A

Tenaga

L.01

0.14

OH

Pekerja

L.02

0.07

OH

Tukang Kayu

L.03

0.007

OH

Kepala Tukang

L.04

0.007

OH

Mandor

B

Bahan

0.6

Lbr

Asbes Gelombang

0.12

Kg

Paku Pancing 60 x 230

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/306

abk 8-14

No.

SNI

9

A.4.5.2.12

10

11

414275883.xlsx

KODE

KOEF

URAIAN PEKERJAAN

SAT. 1

m2

Pemasangan Atap Asbes Gelombang (3,00x1,05 m) x 4 m

A

Tenaga

L.01

0.14

OH

Pekerja

L.02

0.07

OH

Tukang Kayu

L.03

0.007

OH

Kepala Tukang

L.04

0.007

OH

Mandor

B

Bahan

A.4.5.2.15

0.35

Lbr

Asbes Gelombang

0.12

Kg

Paku Pancing 60 x 230

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Atap Asbes Gelombang (2,10x1,05 m) x 4 m

A

Tenaga

L.01

0.14

OH

Pekerja

L.02

0.070

OH

Tukang Kayu

L.03

0.007

OH

Kepala Tukang

L.04

0.007

OH

Mandor

B

Bahan

A.4.5.2.30

0.51

Lbr

Asbes Gelombang

0.12

Kg

Paku Pancing 60 x 230

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Atap Genteng Beton

A

Tenaga

L.01

0.2

OH

Pekerja

L.02

0.1

OH

Tukang Kayu

L.03

0.01

OH

Kepala Tukang

432/307

abk 8-14

No.

SNI

KODE L.04

12

13

414275883.xlsx

A.4.5.2.32

KOEF

URAIAN PEKERJAAN

SAT.

0.01

OH

Mandor

B

Bahan

11

Lbr

Genteng Beton Standrad

0.03

Kg

Paku Biasa 2" - 5"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Atap Genteng Metal

A

Tenaga

L.01

0.2

OH

Pekerja

L.02

0.1

OH

Tukang Kayu

L.03

0.01

OH

Kepala Tukang

L.04

0.01

OH

Mandor

B

Bahan

A.4.5.2.33

1.02

m2

Genteng Metal

0.20

Kg

Paku Biasa Ø ½" - 1"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Atap Sirap

A

Tenaga

L.01

0.166

OH

Pekerja

L.02

0.25

OH

Tukang Kayu

L.03

0.025

OH

Kepala Tukang

L.04

0.008

OH

Mandor

B

Bahan

30

Lbr

Genteng Sirap

0.2

Kg

Paku Biasa 1/2" - 1"

432/308

abk 8-14

No.

14

15

414275883.xlsx

SNI

KODE

A.4.5.2.34

KOEF

URAIAN PEKERJAAN

SAT.

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Nok Genteng Beton

A

Tenaga

L.01

0.4

OH

Pekerja

L.02

0.2

OH

Tukang Kayu

L.03

0.02

OH

Kepala Tukang

L.04

0.02

OH

Mandor

B

Bahan

A.4.5.2.36

3.5

Buah

0.05

Kg

Paku Biasa 2" - 5"

10.8

Kg

Portland Semen

0.032

m3

Pasir Pasang

1

Kg

Semen Warna

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Nok Genteng Metal

A

Tenaga

1

Nok Genteng Beton

L.01

0.250

OH

Pekerja

L.02

0.150

OH

Tukang Kayu

L.03

0.015

OH

Kepala Tukang

L.04

0.013

OH

Mandor

B

Bahan

1.1

Buah

Nok Genteng

0.05

Kg

Paku Biasa 1/2" - 1"

C

PERALATAN

432/309

abk 8-14

No.

16

17

414275883.xlsx

SNI

KODE

A.4.5.2.37

KOEF

URAIAN PEKERJAAN

SAT.

1

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Nok Sirap

A

Tenaga

L.01

0.125

OH

Pekerja

L.02

0.25

OH

Tukang Kayu

L.03

0.025

OH

Kepala Tukang

L.04

0.006

OH

Mandor

B

Bahan

A.4.5.2.38

0.4

Lbr

Seng Plaat 3" x 6" BJLS 28

0.06

Kg

Paku Biasa 1/2" - 1"

0.05

Kg

Paku Biasa 2" - 5"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Atap Seng Gelombang

A

Tenaga

L.01

0.12

OH

Pekerja

L.02

0.06

OH

Tukang Kayu

L.03

0.006

OH

Kepala Tukang

L.04

0.006

OH

Mandor

B

Bahan

0.7

Lbr

Seng Gelombang 3" x 6" BJLS 28

0.02

Kg

Paku Biasa 1/2" - 1"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/310

abk 8-14

No.

SNI

18

A.4.5.2.39

19

414275883.xlsx

KODE

KOEF

URAIAN PEKERJAAN

SAT.

1

m'

Pemasangan Atap Nok Seng

A

Tenaga

L.01

0.15

OH

Pekerja

L.02

0.07

OH

Tukang Kayu

L.03

0.007

OH

Kepala Tukang

L.04

0.006

OH

Mandor

B

Bahan

A.4.5.2.42

0.3

Lbr

Seng Plaat 3" x 6" BJLS 28

0.04

Kg

Paku Biasa 1/2" - 1"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pasang Allumunium Foil / Sisalation

A

Tenaga

L.01

0.15

OH

Pekerja

L.02

0.05

OH

Tukang Kayu

L.03

0.005

OH

Kepala Tukang

L.04

0.008

OH

Mandor

B

Bahan

1.05

m2

Sisalation / Allumunium Foil

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/311

abk 8-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

PEKERJAAN PENUTUP ATAP 64,489.15 16,126.50 57,000.00

8,550.00

84,000.00

6,300.00

87,000.00

652.50

78,000.00

624.00 42,500.00

1,700.00

42,500.00

58,626.50 5,862.65

10%

64,489.15

130,537.00 16,170.00 57,000.00

8,550.00

84,000.00

6,300.00

87,000.00

696.00

78,000.00

624.00 102,500.00

4,100.00

102,500.00

118,670.00 11,867.00

10%

130,537.00

Genteng Plentong Super / Besar

414275883.xlsx

120,747.00 16,170.00 57,000.00

8,550.00

84,000.00

6,300.00

87,000.00

696.00

432/312

abk 8-14

URAIAN PEKERJAAN

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

78,000.00

624.00 93,600.00

5,200.00

93,600.00

109,770.00 10,977.00

10%

120,747.00

114,505.60 41,496.00 57,000.00

22,800.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

156.00 62,600.00

9,000.00

45,000.00

1,360.00

10,880.00

210,000.00

6,720.00

104,096.00 10,409.60

10%

114,505.60

432/313

abk 8-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

eng Bubung Kodok / Glasur

101,305.60 41,496.00 57,000.00

22,800.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

156.00 50,600.00

6,600.00

33,000.00

1,360.00

10,880.00

210,000.00

6,720.00

92,096.00 9,209.60

10%

101,305.60

eng Bubung Plentong Besar

104,605.60 41,496.00 57,000.00

22,800.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

156.00 53,600.00

9,000.00

36,000.00

1,360.00

10,880.00

210,000.00

6,720.00

95,096.00 9,509.60

10%

104,605.60

Asbes Gelombang (2,25x0,92 m) x 5 mm

414275883.xlsx

66,396.00 15,600.00 57,000.00 432/314

7,980.00

abk 8-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

84,000.00

6,300.00

87,000.00

696.00

78,000.00

624.00 44,760.00

71,500.00

42,900.00

15,500.00

1,860.00

60,360.00 6,036.00

10%

66,396.00

Asbes Gelombang (2,00x0,92 m) x 5 mm

414275883.xlsx

60,472.50 15,015.00 57,000.00

7,980.00

84,000.00

5,880.00

87,000.00

609.00

78,000.00

546.00 39,960.00

63,500.00

38,100.00

15,500.00

1,860.00

54,975.00 5,497.50

10%

60,472.50

432/315

abk 8-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

Asbes Gelombang (3,00x1,05 m) x 4 mm

52,057.50 15,015.00 57,000.00

7,980.00

84,000.00

5,880.00

87,000.00

609.00

78,000.00

546.00 32,310.00

87,000.00

30,450.00

15,500.00

1,860.00

47,325.00 4,732.50

10%

52,057.50

Asbes Gelombang (2,10x1,05 m) x 4 mm

414275883.xlsx

53,344.50 15,015.00 57,000.00

7,980.00

84,000.00

5,880.00

87,000.00

609.00

78,000.00

546.00 33,480.00

62,000.00

31,620.00

15,500.00

1,860.00

48,495.00 4,849.50

10%

53,344.50

96,657.00 21,450.00 57,000.00

11,400.00

84,000.00

8,400.00

87,000.00

870.00

432/316

abk 8-14

URAIAN PEKERJAAN

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

78,000.00

780.00 66,420.00

6,000.00

66,000.00

14,000.00

420.00

87,870.00 8,787.00

10%

96,657.00 82,775.00 21,450.00 57,000.00

11,400.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

780.00 53,800.00

50,000.00

51,000.00

14,000.00

2,800.00

75,250.00 7,525.00

10%

82,775.00 101,377.10 33,261.00 57,000.00

9,462.00

84,000.00

21,000.00

87,000.00

2,175.00

78,000.00

624.00 58,900.00

1,870.00

56,100.00

14,000.00

2,800.00

432/317

abk 8-14

URAIAN PEKERJAAN

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

92,161.00 9,216.10

10%

101,377.10

106,158.80 42,900.00 57,000.00

22,800.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

1,560.00 53,608.00

9,000.00

31,500.00

14,000.00

700.00

1,360.00

14,688.00

210,000.00

6,720.00

9,000.00

9,000.00

96,508.00 9,650.80

10%

106,158.80

57,055.90 29,169.00 57,000.00

14,250.00

84,000.00

12,600.00

87,000.00

1,305.00

78,000.00

1,014.00 22,700.00

20,000.00

22,000.00

14,000.00

700.00

432/318

abk 8-14

URAIAN PEKERJAAN

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 51,869.00 5,186.90

10%

57,055.90

46,978.80 30,768.00 57,000.00

7,125.00

84,000.00

21,000.00

87,000.00

2,175.00

78,000.00

468.00 11,940.00

26,000.00

10,400.00

14,000.00

840.00

14,000.00

700.00

42,708.00 4,270.80

10%

46,978.80

34,485.00 12,870.00 57,000.00

6,840.00

84,000.00

5,040.00

87,000.00

522.00

78,000.00

468.00 18,480.00

26,000.00

18,200.00

14,000.00

280.00

31,350.00 3,135.00

10%

34,485.00

432/319

abk 8-14

URAIAN PEKERJAAN

414275883.xlsx

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

26,253.70 15,507.00 57,000.00

8,550.00

84,000.00

5,880.00

87,000.00

609.00

78,000.00

468.00 8,360.00

26,000.00

7,800.00

14,000.00

560.00

23,867.00 2,386.70

10%

26,253.70

24,083.40 13,809.00 57,000.00

8,550.00

84,000.00

4,200.00

87,000.00

435.00

78,000.00

624.00 8,085.00

7,700.00

8,085.00

21,894.00 2,189.40

10%

24,083.40

432/320

abk 8-14

No.

SNI

IX

A.4.5.1 1

KODE

KOEF

URAIAN PEKERJAAN

SAT.

HARGA SATUAN PEKERJAAN LANGIT-LANGIT

A.4.5.1.1

1

m2

Pemasangan Langit-langit Asbes (1,00x1,00) m, teba

A

Tenaga

L.01

0.03

OH

Pekerja

L.02

0.07

OH

Tukang Kayu

L.03

0.007

OH

Kepala Tukang

L.04

0.004

OH

Mandor

B

Bahan

1.1

Lbr

Plat Asbes

0.01

Kg

Paku

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%)

2

3

A.4.5.1.2

1

Pemasangan Langit-langit Akustik Ukuran (30x30) cm

A

Tenaga

L.01

0.12

OH

Pekerja

L.02

0.12

OH

Tukang Kayu

L.03

0.012

OH

Kepala Tukang

L.04

0.006

OH

Mandor

B

Bahan

A.4.5.1.3

12.0

Lbr

Akustik Uk.30 x 30 cm

0.05

Kg

Paku

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

L.01 414275883.xlsx

m2

0.10

m2

Pemasangan Langit-langit Akustik Ukuran (30x60) c

A

Tenaga

OH

Pekerja

432/321

abk 9-14

No.

4

5

SNI

KODE

URAIAN PEKERJAAN

SAT.

L.02

0.10

OH

Tukang Kayu

L.03

0.01

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

5.80

Lbr

Akustik

0.05

Kg

Paku

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.5.1.4

1

m2

Pemasangan Langit-langit Akustik Ukuran (60x120)

A

Tenaga

L.01

0.10

OH

Pekerja

L.02

0.10

OH

Tukang Kayu

L.03

0.01

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

1.50

Lbr

Akustik

0.05

Kg

Paku

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.5.1.5

414275883.xlsx

KOEF

1

m2

Memasang Langit-langit Tripleks Uk (120x240) cm, T

A

Tenaga

L.01

0.10

OH

Pekerja

L.02

0.10

OH

Tukang Kayu

L.03

0.01

OH

Kepala Tukang

L.04

0.005

OH

Mandor

432/322

abk 9-14

No.

SNI

KODE

KOEF

B

6

7

A.4.5.1.6

Bahan

0.375

Lbr

Tripleks (4 mm)

0.03

Kg

Paku Tripleks

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Memasang Langit-langit Lambriziring Kayu Jati, teba

A

Tenaga

L.01

0.8

OH

Pekerja

L.02

0.8

OH

Tukang Kayu

L.03

0.08

OH

Kepala Tukang

L.04

0.04

OH

Mandor

B

Bahan

A.4.5.1.7

414275883.xlsx

URAIAN PEKERJAAN

SAT.

0.015

m3

Kayu Jati,Papan

0.01

Kg

Paku

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Memasang Langit-langit Gypsu Board, Uk (120x240)

A

Tenaga

L.01

0.1

OH

Pekerja

L.02

0.05

OH

Tukang Kayu

L.03

0.005

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

0.364

Lbr

Gypsum Board

0.11

Kg

Paku Sekrup

C

PERALATAN

D

Jumlah A + B + C

432/323

abk 9-14

No.

8

9

SNI

KODE

A.4.5.1.9

URAIAN PEKERJAAN

SAT.

1

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Memasang Langit-langit Akuatik Uk (60x120) cm & R

A

Tenaga

L.01

0.5

OH

Pekerja

L.02

0.5

OH

Tukang Kayu

L.03

0.05

OH

Kepala Tukang

L.04

0.025

OH

Mandor

B

Bahan

3.6

m'

Profil Allumunium "T"

0.15

kg

Kawat Ø 4 mm

1.05

bh

Ramset

1.5

lmb

Akuatik 60 x 120 cm

A.4.5.1.10

414275883.xlsx

KOEF

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m1

List Langit-Langit Kayu Profil

A

Tenaga

L.01

0.05

OH

Pekerja

L.02

0.05

OH

Tukang Kayu

L.03

0.005

OH

Kepala Tukang

L.04

0.003

OH

Mandor

B

Bahan

1.05

m1

List Kayu Profil

0.01

Kg

Paku

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/324

abk 9-14

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

URAIAN PEKERJAAN

PEKERJAAN LANGIT-LANGIT

ngit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm

28,876.10 8,511.00 57,000.00

1,710.00

84,000.00

5,880.00

87,000.00

609.00

78,000.00

312.00 17,740.00

16,000.00

17,600.00

14,000.00

140.00

26,251.00 2,625.10

10%

28,876.10

ngit-langit Akustik Ukuran (30x30) cm

94,965.20 18,432.00 57,000.00

6,840.00

84,000.00

10,080.00

87,000.00

1,044.00

78,000.00

468.00 67,900.00

5,600.00

67,200.00

14,000.00

700.00

86,332.00 8,633.20

10%

94,965.20

ngit-langit Akustik Ukuran (30x60) cm

103,796.00 15,360.00 57,000.00

414275883.xlsx

432/325

5,700.00 abk 9-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

84,000.00

8,400.00

87,000.00

870.00

78,000.00

390.00 79,000.00

13,500.00

78,300.00

14,000.00

700.00

94,360.00 9,436.00

10%

103,796.00

ngit-langit Akustik Ukuran (60x120) cm

85,316.00 15,360.00 57,000.00

5,700.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

390.00 62,200.00

41,000.00

61,500.00

14,000.00

700.00

77,560.00 7,756.00

10%

85,316.00

it-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm

43,345.50 15,360.00

414275883.xlsx

57,000.00

5,700.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

390.00

432/326

abk 9-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 24,045.00

63,000.00

23,625.00

14,000.00

420.00

39,405.00 3,940.50

10%

43,345.50

it-langit Lambriziring Kayu Jati, tebal 6 mm

498,322.00 122,880.00 57,000.00

45,600.00

84,000.00

67,200.00

87,000.00

6,960.00

78,000.00

3,120.00 330,140.00

22,000,000.00

330,000.00

14,000.00

140.00

453,020.00 45,302.00

10%

498,322.00

it-langit Gypsu Board, Uk (120x240) tebal 9 mm

39,838.70 10,725.00 57,000.00

5,700.00

84,000.00

4,200.00

87,000.00

435.00

78,000.00

390.00 25,492.00

65,500.00

23,842.00

15,000.00

1,650.00

36,217.00 414275883.xlsx

432/327

abk 9-14

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

URAIAN PEKERJAAN

3,621.70

10%

39,838.70

it-langit Akuatik Uk (60x120) cm & Rangka Allumunium

191,895.00 76,800.00 57,000.00

28,500.00

84,000.00

42,000.00

87,000.00

4,350.00

78,000.00

1,950.00 97,650.00

3,500.00

12,600.00

6,500.00

975.00

21,500.00

22,575.00

41,000.00

61,500.00

174,450.00 17,445.00

10%

191,895.00

14,188.90 7,719.00 57,000.00

2,850.00

84,000.00

4,200.00

87,000.00

435.00

78,000.00

234.00 5,180.00

4,800.00

5,040.00

14,000.00

140.00

12,899.00 1,289.90

10%

14,188.90

414275883.xlsx

432/328

abk 9-14

No.

SNI

X

A.5.1.1

1

KODE

KOEF

URAIAN PEKERJAAN

SAT.

HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUN 1 Unit Memasang Closet Duduk / Mono Blok

A.5.1.1.1

A

Tenaga

L.01

3.3

OH

Pekerja

L.02

1.1

OH

Tukang Batu

L.03

0.001

OH

Kepala Tukang

L.04

0.16

OH

Mandor

Buah 1 Buah 0.06

Bahan Kloset Duduk / Monoblok Kelengkapan 6% dari harga Kloset

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%)

2

1 Unit

A.5.1.1.2

Tenaga

1

OH

Pekerja

L.02

1.5

OH

Tukang Batu

L.03

1.5

OH

Kepala Tukang

L.04

0.16

OH

Mandor

B

Bahan

Buah Kloset Jongkok

6

Kg

Portland Semen

0.01

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1 Unit

A.5.1.1.4

414275883.xlsx432/329

A L.01

1

3

Memasang Closet Jongkok Porselen

Memasang Urinoir

A

Tenaga

L.01

1

OH

Pekerja

L.02

1

OH

Tukang Batu

L.03

0.1

OH

Kepala Tukang abk 10-14

No.

SNI

KODE L.04

KOEF 0.1

1 0.3

4

B

Bahan

Buah Urinoir -

Perlengkapan 30% Harga Urinoir

Kg

Portland Semen

0.01

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

Memasang Wastafel

A

Tenaga

L.01

1.2

OH

Pekerja

L.02

0.145

OH

Tukang Batu

L.03

0.15

OH

Kepala Tukang

L.04

0.1

OH

Mandor

B

Bahan

0.3

A.5.1.1.6

414275883.xlsx432/330

Mandor

6

1

5

OH

1 Unit

A.5.1.1.5

URAIAN PEKERJAAN

SAT.

Buah Wastafel -

Perlengkapan 30% Harga Wastafel

6

Kg

Portland Semen

0.01

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1 Unit Pemasangan Bathcuip porselen A

Tenaga

L.01

0.075

OH

Pekerja

L.02

0.75

OH

Tukang Batu

L.03

0.075

OH

Kepala Tukang

L.04

0.003

OH

Mandor

abk 10-14

No.

SNI

KODE

KOEF

B

1 0.2

6

A.5.1.1.7

-

Perlengkapan 20% Harga Bathcuip

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1 Unit Pemasangan Bak Fibreglass vol.1 m3 A

Tenaga

L.01

3

OH

Pekerja

L.02

4.5

OH

Tukang Batu

L.03

0.05

OH

Kepala Tukang

L.04

0.9

OH

Mandor

1 0.12

A.5.1.1.8

Tukang Batu

Buah Bak Fibreglass -

Perlengkapan 12% Bak Fibreglass

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1 Unit

Memasang Bak Mandi Batu Bata Vol. 0,30 m3

A

Tenaga

L.01

6.00

OH

Pekerja

L.02

3.00

OH

Tukang Batu

L.03

0.30

OH

Kepala Tukang

L.04

0.03

OH

Mandor

B

Bahan

150.0

bh

Batu Bata

120

Kg

Portland Semen

0.3

m3

Pasir Pasang

360 6

414275883.xlsx432/331

Bahan

Buah Batchuip

B

7

URAIAN PEKERJAAN

SAT.

buah Porselen 11 x 11 cm Kg

Semen Nat

C

PERALATAN

D

Jumlah A + B + C abk 10-14

No.

8

9

SNI

KODE

A.5.1.1.12

KOEF

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1 buah Pemasangan Bak Cuci Piring Stainless stell A

Tenaga

L.01

0.030

OH

Pekerja

L.02

0.300

OH

Tukang Batu

L.03

0.030

OH

Kepala Tukang

L.04

0.015

OH

Mandor

B

Bahan

A.5.1.1.14

1

unit

Bak Cuci Piring

1

bh

Water drain

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1 buah Pemasangan Floor Drain A

Tenaga

L.01

0.010

OH

Pekerja

L.02

0.100

OH

Tukang Batu

L.03

0.010

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

bh

Floor Drain

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

414275883.xlsx432/332

URAIAN PEKERJAAN

SAT.

abk 10-14

No.

SNI

10

A.5.1.1.15

11

KODE

URAIAN PEKERJAAN

SAT. 1

bh

Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 c

A

Tenaga

L.01

2.160

OH

Pekerja

L.02

0.720

OH

Tukang Batu

L.03

0.072

OH

Kepala Tukang

L.04

0.011

OH

Mandor

B

Bahan

40.00

bh

Batu Bata

44.00

kg

Semen Portland

0.07

m3

Pasir Pasang

0.06

m3

Pasir Beton

0.07

m3

Kerikil

1.60

kg

Baja Tulangan

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.5.1.1.16

414275883.xlsx432/333

KOEF

1

bh

Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50

A

Tenaga

L.01

3.200

OH

Pekerja

L.02

1.150

OH

Tukang Batu

L.03

0.011

OH

Kepala Tukang

L.04

0.016

OH

Mandor

B

Bahan

70.00

bh

Batu Bata

77.00

kg

Semen Portland

0.13

m3

Pasir Pasang

0.09

m3

Pasir Beton

0.02

m3

Kerikil

1.60

kg

Baja Tulangan

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

abk 10-14

No.

SNI

12

A.5.1.1.17

13

KODE

URAIAN PEKERJAAN

SAT. 1

bh

Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 c

A

Tenaga

L.01

3.200

OH

Pekerja

L.02

1.150

OH

Tukang Batu

L.03

0.011

OH

Kepala Tukang

L.04

0.016

OH

Mandor

B

Bahan

123.00

bh

Batu Bata

114.00

kg

Semen Portland

0.18

m3

Pasir Pasang

0.12

m3

Pasir Beton

4.85

kg

Baja Tulangan

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa Galvanis Ø ½"

A

Tenaga

A.5.1.1.18

414275883.xlsx432/334

KOEF

1 L.01

0.054

OH

Pekerja

L.02

0.090

OH

Tukang Batu

L.03

0.009

OH

Kepala Tukang

L.04

0.027

OH

Mandor

B

Bahan

1.20

m'

Pipa Galvanis Ø ½"

0.35

Ls

Perlengkapan 35% x pipa

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

abk 10-14

No. 14

15

16

SNI

KODE

A.5.1.1.19

KOEF 1

bh

Pemasangan Kran Ø ½" atau Ø ¾"

A

Tenaga

L.01

0.010

OH

Pekerja

L.02

0.400

OH

Tukang Batu

L.03

0.040

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

1.00

bh

Kran Air

0.0025

bh

Sealtape

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa Galvanis Ø ¾"

A

Tenaga

A.5.1.1.20

1 L.01

0.054

OH

Pekerja

L.02

0.090

OH

Tukang Batu

L.03

0.009

OH

Kepala Tukang

L.04

0.027

OH

Mandor

B

Bahan

1.20

m'

Pipa Galvanis Ø ¾"

0.35

Ls

Perlengkapan 35% x pipa

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa Galvanis Ø 1"

A

Tenaga

A.5.1.1.21

1 L.01

0.054

OH

Pekerja

L.02

0.090

OH

Tukang Batu

L.03

0.009

OH

Kepala Tukang

L.04

0.027

OH

Mandor

B

Bahan

m'

Pipa Galvanis Ø 1"

1.20 414275883.xlsx432/335

URAIAN PEKERJAAN

SAT.

abk 10-14

No.

SNI

KODE

KOEF 0.35

17

18

A.5.1.1.22

1

Ls

Perlengkapan 35% x pipa

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa Galvanis Ø 1½ "

A

Tenaga

L.01

0.108

OH

Pekerja

L.02

0.180

OH

Tukang Batu

L.03

0.018

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

1.20

m'

Pipa Galvanis Ø 1½"

0.35

Ls

Perlengkapan 35% x pipa

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa Galvanis Ø 3"

A

Tenaga

A.5.1.1.23

414275883.xlsx432/336

URAIAN PEKERJAAN

SAT.

1 L.01

0.135

OH

Pekerja

L.02

0.225

OH

Tukang Batu

L.03

0.023

OH

Kepala Tukang

L.04

0.007

OH

Mandor

B

Bahan

1.20

m'

Pipa Galvanis Ø 3"

0.35

Ls

Perlengkapan 35% x pipa

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

abk 10-14

No.

SNI

19

A.5.1.1.24

20

21

KODE

URAIAN PEKERJAAN

SAT.

1

m'

Pemasangan Pipa Galvanis Ø 4"

A

Tenaga

L.01

0.135

OH

Pekerja

L.02

0.225

OH

Tukang Batu

L.03

0.023

OH

Kepala Tukang

L.04

0.007

OH

Mandor

B

Bahan

1.20

m'

Pipa Galvanis Ø 4"

0.35

Ls

Perlengkapan 35% x pipa

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa PVC tipe AW Ø ½"

A

Tenaga

A.5.1.1.25

1 L.01

0.036

OH

Pekerja

L.02

0.060

OH

Tukang Batu

L.03

0.006

OH

Kepala Tukang

L.04

0.002

OH

Mandor

B

Bahan

1.20

m'

Pipa PVC Ø ½"

0.35

Ls

Perlengkapan 35% x pipa

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa PVC tipe AW Ø ¾"

A

Tenaga

A.5.1.1.26

414275883.xlsx432/337

KOEF

1 L.01

0.036

OH

Pekerja

L.02

0.060

OH

Tukang Batu

L.03

0.006

OH

Kepala Tukang

L.04

0.002

OH

Mandor

B

Bahan abk 10-14

No.

22

23

SNI

KODE

A.5.1.1.27

URAIAN PEKERJAAN

SAT.

1.20

m'

Pipa PVC Ø ¾"

0.35

Ls

Perlengkapan 35% x pipa

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa PVC tipe AW Ø 1"

A

Tenaga

1 L.01

0.036

OH

Pekerja

L.02

0.060

OH

Tukang Batu

L.03

0.006

OH

Kepala Tukang

L.04

0.002

OH

Mandor

B

Bahan

1.20

m'

Pipa PVC Ø 1"

0.35

Ls

Perlengkapan 35% x pipa

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa PVC tipe AW Ø 1½"

A

Tenaga

A.5.1.1.28

414275883.xlsx432/338

KOEF

1 L.01

0.054

OH

Pekerja

L.02

0.090

OH

Tukang Batu

L.03

0.009

OH

Kepala Tukang

L.04

0.003

OH

Mandor

B

Bahan

1.20

m'

Pipa PVC Ø 1½"

0.35

Ls

Perlengkapan 35% x pipa

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

abk 10-14

No.

SNI

24

A.5.1.1.29

25

26

KODE

URAIAN PEKERJAAN

SAT.

1

m'

Pemasangan Pipa PVC tipe AW Ø 2"

A

Tenaga

L.01

0.054

OH

Pekerja

L.02

0.090

OH

Tukang Batu

L.03

0.009

OH

Kepala Tukang

L.04

0.003

OH

Mandor

B

Bahan

1.20

m'

Pipa PVC Ø 2"

0.35

Ls

Perlengkapan 35% x pipa

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa PVC tipe AW Ø 3"

A

Tenaga

A.5.1.1.31

1 L.01

0.081

OH

Pekerja

L.02

0.135

OH

Tukang Batu

L.03

0.0135

OH

Kepala Tukang

L.04

0.004

OH

Mandor

B

Bahan

1.20

m'

Pipa PVC Ø 3"

0.35

Ls

Perlengkapan 35% x pipa

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa PVC tipe AW Ø 4"

A

Tenaga

A.5.1.1.32

414275883.xlsx432/339

KOEF

1 L.01

0.036

OH

Pekerja

L.02

0.060

OH

Tukang Batu

L.03

0.006

OH

Kepala Tukang

L.04

0.002

OH

Mandor

B

Bahan abk 10-14

No.

27

28

SNI

KODE

A.5.1.1.33

URAIAN PEKERJAAN

SAT.

1.20

m'

Pipa PVC Ø 4"

0.35

Ls

Perlengkapan 35% x pipa

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm

A

Tenaga

1 L.01

0.080

OH

Pekerja

L.02

0.040

OH

Tukang Batu

L.03

0.004

OH

Kepala Tukang

L.04

0.004

OH

Mandor

B

Bahan

1.60

bh

pipa tanah

35.00

kg

Semen Portlan

0.014

m3

Pasir Pasang

0.014

m3

Pasir Urug

A.5.1.1.34

414275883.xlsx432/340

KOEF

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm

A

Tenaga

L.01

0.060

OH

Pekerja

L.02

0.030

OH

Tukang Batu

L.03

0.003

OH

Kepala Tukang

L.04

0.003

OH

Mandor

abk 10-14

No.

29

30

SNI

KODE

A.5.1.1.35

KOEF

B

Bahan

1.60

bh

pipa tanah

6.80

kg

Semen Portlan

0.013

m3

Pasir Pasang

0.011

m3

Pasir Urug

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa Beton Ø 20 cm

A

Tenaga

L.01

0.140

OH

Pekerja

L.02

0.070

OH

Tukang Batu

L.03

0.007

OH

Kepala Tukang

L.04

0.007

OH

Mandor

B

Bahan

1.10

bh

pipa beton

0.03

m3

Batu Bata

3.920

kg

Semen Portlan

0.056

m3

Pasir Pasang

0.024

m3

Pasir Urug

A.5.1.1.36

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa Beton Ø 100 cm

A

Tenaga

L.01

0.380

OH

Pekerja

L.02

0.190

OH

Tukang Batu

L.03

0.019

OH

Kepala Tukang

L.04

0.019

OH

Mandor

B

Bahan

bh

pipa beton

1.10 414275883.xlsx432/341

URAIAN PEKERJAAN

SAT.

abk 10-14

No.

SNI

414275883.xlsx432/342

KODE

KOEF

URAIAN PEKERJAAN

SAT.

0.55

m3

Batu Bata

10.300

kg

Semen Portlan

0.061

m3

Pasir Pasang

0.069

m3

Pasir Urug

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

abk 10-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

PEKERJAAN SANITASI DALAM GEDUNG 1,779,873.70 293,067.00 57,000.00

188,100.00

84,000.00

92,400.00

87,000.00

87.00

78,000.00

12,480.00 1,325,000.00

1,250,000.00

1,250,000.00

1,250,000.00

75,000.00

1,618,067.00 161,806.70

10%

1,779,873.70

518,364.00 325,980.00 57,000.00

57,000.00

84,000.00

126,000.00

87,000.00

130,500.00

78,000.00

12,480.00 145,260.00

135,000.00

135,000.00

1,360.00

8,160.00

210,000.00

2,100.00

471,240.00 47,124.00

10%

518,364.00

685,036.00 157,500.00

414275883.xlsx432/343

57,000.00

57,000.00

84,000.00

84,000.00

87,000.00

8,700.00 abk 10-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

78,000.00

7,800.00 465,260.00

350,000.00

350,000.00

350,000.00

105,000.00

1,360.00

8,160.00

210,000.00

2,100.00

622,760.00 62,276.00

10%

685,036.00

666,259.00 101,430.00 57,000.00

68,400.00

84,000.00

12,180.00

87,000.00

13,050.00

78,000.00

7,800.00 504,260.00

380,000.00

380,000.00

380,000.00

114,000.00

1,360.00

8,160.00

210,000.00

2,100.00

605,690.00 60,569.00

10%

666,259.00

1,071,437.40 74,034.00

414275883.xlsx432/344

57,000.00

4,275.00

84,000.00

63,000.00

87,000.00

6,525.00

78,000.00

234.00

abk 10-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 900,000.00

750,000.00

750,000.00

750,000.00

150,000.00

974,034.00 97,403.40

10%

1,071,437.40

1,024,705.00 623,550.00

57,000.00

171,000.00

84,000.00

378,000.00

87,000.00

4,350.00

78,000.00

70,200.00 308,000.00

275,000.00

275,000.00

275,000.00

33,000.00

931,550.00 93,155.00

10%

1,024,705.00

1,283,947.90 622,440.00 57,000.00

342,000.00

84,000.00

252,000.00

87,000.00

26,100.00

78,000.00

2,340.00 544,785.37

520.00

78,000.00

0.11

1,360.00

163,200.00

0.0121

210,000.00

63,000.00

82.6446280992

518.29

186,585.37

9,000.00

54,000.00

1,167,225.37 414275883.xlsx432/345

abk 10-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 116,722.54

10%

1,283,947.90

336,259.00 30,690.00 57,000.00

1,710.00

84,000.00

25,200.00

87,000.00

2,610.00

78,000.00

1,170.00 275,000.00

225,000.00

225,000.00

50,000.00

50,000.00

305,690.00 30,569.00

10%

336,259.00

31,053.00 10,230.00 57,000.00

570.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

390.00 18,000.00

18,000.00

18,000.00

28,230.00 10%

2,823.00 31,053.00

414275883.xlsx432/346

abk 10-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

Kontrol Pas.Batu Bata 30x30 tinggi 35 cm

360,527.20 190,722.00 57,000.00

123,120.00

84,000.00

60,480.00

87,000.00

6,264.00

78,000.00

858.00 137,030.00

520.00

20,800.00

1,360.00

59,840.00

210,000.00

14,700.00

280,000.00

16,800.00

127,000.00

8,890.00

10,000.00

16,000.00

327,752.00 32,775.20

10%

360,527.20

Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm

542,701.50 281,205.00 57,000.00

182,400.00

84,000.00

96,600.00

87,000.00

957.00

78,000.00

1,248.00 212,160.00

520.00

36,400.00

1,360.00

104,720.00

210,000.00

27,300.00

280,000.00

25,200.00

127,000.00

2,540.00

10,000.00

16,000.00

493,365.00 10%

49,336.50 542,701.50

414275883.xlsx432/347

abk 10-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

Kontrol Pas.Batu Bata 60x60 tinggi 60 cm

662,843.50 281,205.00 57,000.00

182,400.00

84,000.00

96,600.00

87,000.00

957.00

78,000.00

1,248.00 321,380.00

520.00

63,960.00

1,360.00

155,040.00

210,000.00

38,640.00

127,000.00

15,240.00

10,000.00

48,500.00

602,585.00 60,258.50

10%

662,843.50

33,918.87 13,527.00 57,000.00

3,078.00

84,000.00

7,560.00

87,000.00

783.00

78,000.00

2,106.00 17,308.33

11,166.67

13,400.00

11,166.67

3,908.33

30,835.33 10%

3,083.53 33,918.87

414275883.xlsx432/348

abk 10-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 72,655.00 38,040.00

57,000.00

570.00

84,000.00

33,600.00

87,000.00

3,480.00

78,000.00

390.00 28,010.00

28,000.00

28,000.00

4,000.00

10.00

66,050.00 6,605.00

10%

72,655.00

37,613.03 13,527.00 57,000.00

3,078.00

84,000.00

7,560.00

87,000.00

783.00

78,000.00

2,106.00 20,666.67

13,333.33

16,000.00

13,333.33

4,666.67

34,193.67 3,419.37

10%

37,613.03

42,443.87 13,527.00 57,000.00

3,078.00

84,000.00

7,560.00

87,000.00

783.00

78,000.00

2,106.00 25,058.33

16,166.67 414275883.xlsx432/349

19,400.00 abk 10-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

16,166.67

5,658.33

38,585.33 3,858.53

10%

42,443.87

65,338.53 23,232.00 57,000.00

6,156.00

84,000.00

15,120.00

87,000.00

1,566.00

78,000.00

390.00 36,166.67

23,333.33

28,000.00

23,333.33

8,166.67

59,398.67 5,939.87

10%

65,338.53

165,614.53 29,142.00 57,000.00

7,695.00

84,000.00

18,900.00

87,000.00

2,001.00

78,000.00

546.00 121,416.67

78,333.33

94,000.00

78,333.33

27,416.67

150,558.67 10%

15,055.87 165,614.53

414275883.xlsx432/350

abk 10-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

270,756.20 29,142.00 57,000.00

7,695.00

84,000.00

18,900.00

87,000.00

2,001.00

78,000.00

546.00 217,000.00

140,000.00

168,000.00

140,000.00

49,000.00

246,142.00 24,614.20

10%

270,756.20

20,055.75 7,770.00 57,000.00

2,052.00

84,000.00

5,040.00

87,000.00

522.00

78,000.00

156.00 10,462.50

6,750.00

8,100.00

6,750.00

2,362.50

18,232.50 1,823.25

10%

20,055.75

22,613.25 7,770.00 57,000.00

2,052.00

84,000.00

5,040.00

87,000.00

522.00

78,000.00

156.00 12,787.50

414275883.xlsx432/351

abk 10-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

8,250.00

9,900.00

8,250.00

2,887.50

20,557.50 2,055.75

10%

22,613.25

27,728.25 7,770.00 57,000.00

2,052.00

84,000.00

5,040.00

87,000.00

522.00

78,000.00

156.00 17,437.50

11,250.00

13,500.00

11,250.00

3,937.50

25,207.50 2,520.75

10%

27,728.25

31,291.33 11,655.00 57,000.00

3,078.00

84,000.00

7,560.00

87,000.00

783.00

78,000.00

234.00 16,791.67

10,833.33

13,000.00

10,833.33

3,791.67

28,446.67 10%

2,844.67 31,291.33

414275883.xlsx432/352

abk 10-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

44,078.83 11,655.00 57,000.00

3,078.00

84,000.00

7,560.00

87,000.00

783.00

78,000.00

234.00 28,416.67

18,333.33

22,000.00

18,333.33

6,416.67

40,071.67 4,007.17

10%

44,078.83

76,021.18 17,443.50 57,000.00

4,617.00

84,000.00

11,340.00

87,000.00

1,174.50

78,000.00

312.00 51,666.67

33,333.33

40,000.00

33,333.33

11,666.67

69,110.17 6,911.02

10%

76,021.18

93,797.00 7,770.00 57,000.00

2,052.00

84,000.00

5,040.00

87,000.00

522.00

78,000.00

156.00 77,500.00

414275883.xlsx432/353

abk 10-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

50,000.00

60,000.00

50,000.00

17,500.00

85,270.00 8,527.00

10%

93,797.00

84,634.00

a Air Limbah Jenis Pipa Tanah Ø 20 cm

8,580.00 57,000.00

4,560.00

84,000.00

3,360.00

87,000.00

348.00

78,000.00

312.00 68,360.00

10,000.00

16,000.00

1,360.00

47,600.00

210,000.00

2,940.00

130,000.00

1,820.00 -

76,940.00 7,694.00

10%

84,634.00

35,907.30

a Air Limbah Jenis Pipa Tanah Ø 15 cm

6,435.00

414275883.xlsx432/354

57,000.00

3,420.00

84,000.00

2,520.00

87,000.00

261.00

78,000.00

234.00

abk 10-14

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

URAIAN PEKERJAAN

26,208.00 8,000.00

12,800.00

1,360.00

9,248.00

210,000.00

2,730.00

130,000.00

1,430.00

,

32,643.00 3,264.30

10%

35,907.30

92,681.82 15,015.00 57,000.00

7,980.00

84,000.00

5,880.00

87,000.00

609.00

78,000.00

546.00 69,241.20

35,000.00

38,500.00

390,000.00

10,530.00

1,360.00

5,331.20

210,000.00

11,760.00

130,000.00

3,120.00

84,256.20 8,425.62

10%

92,681.82

528,080.30 40,755.00 57,000.00

21,660.00

84,000.00

15,960.00

87,000.00

1,653.00

78,000.00

1,482.00 439,318.00

180,000.00 414275883.xlsx432/355

198,000.00 abk 10-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

390,000.00

214,500.00

1,360.00

14,008.00

210,000.00

12,810.00

130,000.00

8,970.00

480,073.00 10%

48,007.30 528,080.30

414275883.xlsx432/356

abk 10-14

No.

SNI

XI

A.4.2.1 1

KODE

KOEF

URAIAN PEKERJAAN

SAT.

HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM

A.4.2.1.1

1

Kg

Pemasangan Besi Profil

A

Tenaga

L.01

0.06

OH

Pekerja

L.02

0.06

OH

Tukang Besi

L.03

0.006

OH

Kepala Tukang

L.04

0.003

OH

Mandor

B

Bahan

1.15

Kg

Besi Profil

0.06

Kg

Meni Besi

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%)

2

A.4.2.1.2

1

414275883.xlsx

Pemasangan Rangka Kuda-kuda Baja IWF

A

Tenaga

L.01

0.06

OH

Pekerja

L.02

0.06

OH

Tukang Besi

L.03

0.006

OH

Kepala Tukang

L.04

0.003

OH

Mandor

B

Bahan

kg

Besi Baja IWF

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

kg

Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja)

A

Tenaga

1.15

3

kg

A.4.2.1.3

100

L.01

0.100

OH

Pekerja

L.02

0.100

OH

Tukang Besi

432/357

abk 11-14

No.

SNI

KODE

KOEF

L.03

0.001

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

1

ltr

Solar

0.1

ltr

Minyak Pelumas

C

PERALATAN

0.800

4

414275883.xlsx

URAIAN PEKERJAAN

SAT.

A.4.2.1.4

1

jam

Sewa Alat

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pembuatan Pintu Besi Plat Baja tebal 2 mm rangkap, rang

A

Tenaga

L.01

1.05

OH

Pekerja

L.02

1.05

OH

Tukang Besi

L.03

0.105

OH

Kepala Tukang

L.04

0.052

OH

Mandor

B

Bahan

15

Kg

Besi Siku L.30.30.3

32.8

Kg

Besi Plat Baja

0.05

Kg

Kawat Las

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/358

abk 11-14

No. 5

SNI

KODE

A.4.2.1.5

KOEF 10

414275883.xlsx

Pengerjaan Pengelasan dengan Las Listrik

A

Tenaga

0.04

OH

Pekerja

L.02

0.02

OH

Tukang Besi

L.03

0.002

OH

Kepala Tukang

L.04

0.002

OH

Mandor

B

Bahan

0.04

kg

Kawat Las

0.03

ltr

Solar

0.004

ltr

Minyak Pelumas

C

PERALATAN

A.4.2.1.7

1

jam

Sewa Alat

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Pintu Rolling Door Besi

A

Tenaga

L.01

1.2

OH

Pekerja

L.02

1.2

OH

Tukang Besi

L.03

0.12

OH

Kepala Tukang

L.04

0.006

OH

Mandor

B

Bahan

1

7

cm

L.01

0.170

6

URAIAN PEKERJAAN

SAT.

A.4.2.1.8

1

m2

Pintu Gulung Besi

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Pintu Lipat (Folding Door)

A

Tenaga

L.01

0.44

OH

Pekerja

L.02

0.44

OH

Tukang Besi

432/359

abk 11-14

No.

SNI

KODE

KOEF

L.03

0.044

OH

Kepala Tukang

L.04

0.022

OH

Mandor

B

Bahan

1

8

A.4.2.1.9

1

414275883.xlsx

m2

Pintu Lipat

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Sunscreen Allumunium

A

Tenaga

L.01

0.08

OH

Pekerja

L.02

0.8

OH

Tukang Besi

L.03

0.08

OH

Kepala Tukang

L.04

0.004

OH

Mandor

B

Bahan

1

9

URAIAN PEKERJAAN

SAT.

A.4.2.1.10

1

m2

Sunscreen Allumunium

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Rolling Door Allumunium

A

Tenaga

L.01

1

OH

Pekerja

L.02

1

OH

Tukang Besi

L.03

0.1

OH

Kepala Tukang

L.04

0.05

OH

Mandor

432/360

abk 11-14

No.

SNI

KODE

KOEF

B 1

10

A.4.2.1.11

URAIAN PEKERJAAN

SAT.

1

Bahan

m2

Rolling Allumunium

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Kusen Pintu Allumunium

A

Tenaga

L.01

0.043

OH

Pekerja

L.02

0.043

OH

Tukang Besi

L.03

0.0043

OH

Kepala Tukang

L.04

0.0021

OH

Mandor

B

Bahan

m'

Profil Allumunium

1.1

2 buah Skrup Fixer 0.06 Tube Sealant

11

414275883.xlsx

A.4.2.1.12

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Pintu Allumunium Strip Lebar 8 cm

A

Tenaga

L.01

0.085

OH

Pekerja

L.02

0.085

OH

Tukang Besi

L.03

0.0085

OH

Kepala Tukang

L.04

0.0042

OH

Mandor

B

Bahan

4.4

m'

Profil Allumunium

14.6

m'

Allumunium Strip

C

PERALATAN

D

Jumlah A + B + C 432/361

abk 11-14

No.

12

SNI

KODE

A.4.2.1.13

KOEF

URAIAN PEKERJAAN

SAT.

1

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Pintu Kaca Rangka Allumunium

A

Tenaga

L.01

0.085

OH

Pekerja

L.02

0.085

OH

Tukang Besi

L.03

0.009

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

4.4

m'

Pintu Allumunium

4.5

m'

Profil Kaca

0.27 tube Sealant

13

414275883.xlsx

A.4.2.1.14

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Venetions Blinds & Vertical Blinds

A

Tenaga

L.01

0.35

OH

Pekerja

L.02

0.35

OH

Tukang Besi

L.03

0.035

OH

Kepala Tukang

L.04

0.018

OH

Mandor

432/362

abk 11-14

No.

SNI

KODE

KOEF

B 1

14

15

414275883.xlsx

A.4.2.1.15

URAIAN PEKERJAAN

SAT.

1

Bahan

m2

Venetions Blinds atau Vertical Blinds (tirai)

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Terali Besi Strip (2x3) cm

A

Tenaga

L.01

1.67

OH

Pekerja

L.02

1.67

OH

Tukang Las

L.03

0.167

OH

Kepala Tukang

L.04

0.083

OH

Mandor

B

Bahan

6.177

m'

Besi Strip 2x3

27.08

cm

Pengelasan

A.4.2.1.16

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Kawat Nyamuk

A

Tenaga

L.01

0.1

OH

Pekerja

L.02

0.1

OH

Tukang Kayu

L.03

0.01

OH

Kepala Tukang

L.04

0.0050

OH

Mandor

B

Bahan

1.1

m2

Kawat Nyamuk nylon

11.11

cm

Pengelasan

1.716

kg

Baja Strip (0,2x2) cm

C

PERALATAN

D

Jumlah A + B + C 432/363

abk 11-14

No.

16

SNI

KODE

A.4.2.1.17

KOEF

1

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Jendela Nako & Tralis

A

Tenaga

0.2

OH

Pekerja

L.02

0.2

OH

Tukang Kayu

L.03

0.02

OH

Kepala Tukang

L.04

0.001

OH

Mandor

B

Bahan

10 7

414275883.xlsx

E

L.01

1.1

17

URAIAN PEKERJAAN

SAT.

A.4.2.1.18

1

m2

Jendela Nako

buah Paku Skrup 1 - 2,5 cm m'

Besi Strip

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 c

A

Tenaga

L.01

0.20

OH

Pekerja

L.02

0.4

OH

Tukang Kayu

L.03

0.025

OH

Kepala Tukang

L.04

0.01

OH

Mandor

432/364

abk 11-14

No.

SNI

KODE

KOEF

B

18

19

A.4.2.1.19

Bahan

1.05

Lbr

Seng Plaat

0.015

Kg

Paku Biasa 1 - 2,5 cm

0.019

m3

Kayu Papan Klas II atau III

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJ

A

Tenaga

L.01

0.15

OH

Pekerja

L.02

0.3

OH

Tukang Kayu

L.03

0.03

OH

Kepala Tukang

L.04

0.008

OH

Mandor

B

Bahan

A.4.2.1.20

1.05

Lbr

Seng Plaat

0.01

Kg

Paku Biasa 1 - 2,5 cm

0.5

Kg

Besi strip

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 6

A

Tenaga

L.01

0.250

OH

Pekerja

L.02

0.250

OH

Tukang Besi

L.03

0.025

OH

Kepala Tukang

L.04

0.013

OH

Mandor

B

Bahan

m'

Rangka metal hollow 40.40.2 mm

3.50 1.00 414275883.xlsx

URAIAN PEKERJAAN

SAT.

Assesoris (perkuatan; las dll) 432/365

abk 11-14

No.

20

SNI

KODE

A.4.2.1.21

KOEF

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 6

A

Tenaga

L.01

0.350

OH

Pekerja

L.02

0.350

OH

Tukang Besi

L.03

0.035

OH

Kepala Tukang

L.04

0.018

OH

Mandor

B

Bahan

m'

Rangka metal hollow 40.40.2 mm

4.00 1.00

414275883.xlsx

URAIAN PEKERJAAN

SAT.

Assesoris (perkuatan; las dll)

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

432/366

abk 11-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

PEKERJAAN BESI & ALLUMUNIUM 27,968.60 9,216.00 57,000.00

3,420.00

84,000.00

5,040.00

87,000.00

522.00

78,000.00

234.00 16,210.00

13,000.00

14,950.00

21,000.00

1,260.00

25,426.00 2,542.60

10%

27,968.60

26,582.60 9,216.00 57,000.00

3,420.00

84,000.00

5,040.00

87,000.00

522.00

78,000.00

234.00 14,950.00

13,000.00

14,950.00

24,166.00 2,416.60

10%

26,582.60

aan Perakitan (Kuda-kuda Baja)

72,739.70 14,577.00

414275883.xlsx

57,000.00

5,700.00

84,000.00

8,400.00

432/367

abk 11-14

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

URAIAN PEKERJAAN

87,000.00

87.00

78,000.00

390.00 15,550.00

11,300.00

11,300.00

42,500.00

4,250.00 36,000

45,000

36,000 66,127.00 6,612.70

10%

72,739.70

Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku

845,725.10 161,241.00 57,000.00

59,850.00

84,000.00

88,200.00

87,000.00

9,135.00

78,000.00

4,056.00 607,600.00

13,000.00

195,000.00

12,500.00

410,000.00

52,000.00

2,600.00

768,841.00 76,884.10

10%

845,725.10

414275883.xlsx

432/368

abk 11-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 15,981.90 4,290.00

57,000.00

2,280.00

84,000.00

1,680.00

87,000.00

174.00

78,000.00

156.00 2,589.00

52,000.00

2,080.00

11,300.00

339.00

42,500.00

170.00 7,650

45,000

7,650 14,529.00 1,452.90

10%

15,981.90

550,118.80 180,108.00 57,000.00

68,400.00

84,000.00

100,800.00

87,000.00

10,440.00

78,000.00

468.00 320,000.00

320,000.00

320,000.00

500,108.00 50,010.80

10%

550,118.80

525,342.40 67,584.00

414275883.xlsx

57,000.00

25,080.00

84,000.00

36,960.00

432/369

abk 11-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

87,000.00

3,828.00

78,000.00

1,716.00 410,000.00

410,000.00

410,000.00

477,584.00 47,758.40

10%

525,342.40

455,435.20 79,032.00 57,000.00

4,560.00

84,000.00

67,200.00

87,000.00

6,960.00

78,000.00

312.00 335,000.00

335,000.00

335,000.00

414,032.00 41,403.20

10%

455,435.20

454,960.00 153,600.00

414275883.xlsx

57,000.00

57,000.00

84,000.00

84,000.00

87,000.00

8,700.00

78,000.00

3,900.00

432/370

abk 11-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 260,000.00

260,000.00

260,000.00

413,600.00 41,360.00

10%

454,960.00

112,640.99 6,600.90 57,000.00

2,451.00

84,000.00

3,612.00

87,000.00

374.10

78,000.00

163.80 95,800.00

83,000.00

91,300.00

750.00

1,500.00

50,000.00

3,000.00

102,400.90 10,240.09

10%

112,640.99

u Allumunium Strip Lebar 8 cm

488,347.31 13,052.10 57,000.00

4,845.00

84,000.00

7,140.00

87,000.00

739.50

78,000.00

327.60 430,900.00

83,000.00

365,200.00

4,500.00

65,700.00

443,952.10 414275883.xlsx

432/371

abk 11-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 44,395.21

10%

488,347.31

u Kaca Rangka Allumunium

455,793.80 13,158.00 57,000.00

4,845.00

84,000.00

7,140.00

87,000.00

783.00

78,000.00

390.00 401,200.00

83,000.00

365,200.00

5,000.00

22,500.00

50,000.00

13,500.00

414,358.00 41,435.80

10%

455,793.80

etions Blinds & Vertical Blinds

163,678.90 53,799.00

414275883.xlsx

57,000.00

19,950.00

84,000.00

29,400.00

87,000.00

3,045.00

78,000.00

1,404.00

432/372

abk 11-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 95,000.00

95,000.00

95,000.00

148,799.00 14,879.90

10%

163,678.90

338,220.56 256,473.00 57,000.00

95,190.00

84,000.00

140,280.00

87,000.00

14,529.00

78,000.00

6,474.00 51,000.24

1,250.00

7,721.25

1,598.19

43,278.99

307,473.24 30,747.32

10%

338,220.56

49,676.98 15,360.00 57,000.00

5,700.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

390.00 29,800.89

9,000.00

9,900.00

1,598.19

17,755.89

1,250.00

2,145.00

45,160.89 414275883.xlsx

432/373

abk 11-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 4,516.09

10%

49,676.98

64,204.80 30,018.00 57,000.00

11,400.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

78.00 28,350.00

12,500.00

13,750.00

200.00

2,000.00

1,800.00

12,600.00

58,368.00 5,836.80

10%

64,204.80

ng Datar/Jurai , Seng BJLS 28 Lebar 90 cm

172,716.50 47,955.00

414275883.xlsx

57,000.00

11,400.00

84,000.00

33,600.00

87,000.00

2,175.00

78,000.00

780.00

432/374

abk 11-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 109,060.00

15,000.00

15,750.00

14,000.00

210.00

4,900,000.00

93,100.00

157,015.00 15,701.50

10%

172,716.50

ng 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm

65,036.40 36,984.00 57,000.00

8,550.00

84,000.00

25,200.00

87,000.00

2,610.00

78,000.00

624.00 22,140.00

15,000.00

15,750.00

14,000.00

140.00

12,500.00

6,250.00

59,124.00 5,912.40

10%

65,036.40

gka Besi Hollow 1 x 40.40.2mm; Modul 60x120 cm dinding partisi

157,782.90 38,439.00

57,000.00

14,250.00

84,000.00

21,000.00

87,000.00

2,175.00

78,000.00

1,014.00 105,000.00

414275883.xlsx

15,000.00

52,500.00

52,500.00

52,500.00

432/375

abk 11-14

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

143,439.00 14,343.90

10%

157,782.90

gka Besi Hollow 1 x 40.40.2mm; Modul 60x60 cm dinding plafond

191,178.90 53,799.00

57,000.00

19,950.00

84,000.00

29,400.00

87,000.00

3,045.00

78,000.00

1,404.00 120,000.00

15,000.00

60,000.00

60,000.00

60,000.00

173,799.00 17,379.90

10%

191,178.90

414275883.xlsx

432/376

abk 11-14

No.

XII 1

SNI

KODE

KOEF

URAIAN PEKERJAAN

SAT.

A.4.6.2

HARGA SATUAN PEKERJAAN KUNCI dan KACA

A.4.6.2.2

1 Buah Pemasangan Kunci Tanam Biasa A

Tenaga

L.01

0.01

OH

Pekerja

L.02

0.5

OH

Tukang Kayu

L.03

0.01

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

1

Buah

Kunci Tanam Biasa

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E) Overhead & Profit (contoh 10%)

2

A.4.6.2.3

1 Buah A

Tenaga

L.01

0.005

OH

Pekerja

L.02

0.5

OH

Tukang Kayu

L.03

0.005

OH

Kepala Tukang

L.04

0.0025

OH

Mandor

B

Bahan

1 Buah

3

Pemasangan Kunci Kamar Mandi

A.4.6.2.4

Kunci Tanam Kamar Mandi

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1 Buah

Pemasangan Kunci Selinder

A

Tenaga

L.01

0.005

OH

Pekerja

L.02

0.5

OH

Tukang Kayu

L.03

0.005

OH

Kepala Tukang

L.04

0.0025

OH

Mandor

B

Bahan

1 Buah

Kunci Selinder

No.

4

SNI

KODE

A.4.6.2.5

KOEF

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1 Buah

Pemasangan Engsel Pintu

A

Tenaga

L.01

0.015

OH

Pekerja

L.02

0.15

OH

Tukang Kayu

L.03

0.015

OH

Kepala Tukang

L.04

0.0075

OH

Mandor

B

Bahan

1

5

URAIAN PEKERJAAN

SAT.

A.4.6.2.6

Buah

Engsel pintu

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1 Buah Pemasangan Engsel Jendela Kupu-kupu A

Tenaga

L.01

0.01

OH

Pekerja

L.02

0.1

OH

Tukang Kayu

L.03

0.01

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

1

Buah

Engsel Jendela

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

No.

SNI

6

A.4.6.2.7

KODE

KOEF

1 Buah Pemasangan Engsel Angin Tenaga

0.10

OH

Pekerja

L.02

0.20

OH

Tukang Kayu

L.03

0.02

OH

Kepala Tukang

L.04

0.0005

OH

Mandor

B

Bahan

A.4.6.2.9

Buah

Engsel Angin

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1 Buah Pemasangan Kait Angin A

Tenaga

L.01

0.015

OH

Pekerja

L.02

0.15

OH

Tukang Kayu

L.03

0.015

OH

Kepala Tukang

L.04

0.008

OH

Mandor

B

Bahan

1

8

A L.01

1

7

URAIAN PEKERJAAN

SAT.

A.4.6.2.10

Buah

Kait Angin

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1 Buah Pasang Door Closer A

Tenaga

L.01

0.05

OH

Pekerja

L.02

0.5

OH

Tukang Kayu

L.03

0.05

OH

Kepala Tukang

L.04

0.0025

OH

Mandor

B

Bahan

1

Buah C

Door Closer PERALATAN

No.

9

SNI

KODE

A.4.6.2.11

KOEF

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1 Buah Pemasangan Kunci Selot A

Tenaga

L.01

0.02

OH

Pekerja

L.02

0.2

OH

Tukang Kayu

L.03

0.02

OH

Kepala Tukang

L.04

0.001

OH

Mandor

B

Bahan

1

10

URAIAN PEKERJAAN

SAT.

A.4.6.2.13

Buah

Kunci Selot

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1 Buah Pemasangan Door Stop A

Tenaga

L.01

0.01

OH

Pekerja

L.02

0.1

OH

Tukang Kayu

L.03

0.01

OH

Kepala Tukang

L.04

0.0005

OH

Mandor

B

Bahan

1

Buah

Door Stop

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

No.

SNI

11

A.4.6.2.14

KODE

KOEF

1 Buah Pemasangan Rel Pintu Dorong Tenaga

0.06

OH

Pekerja

L.02

0.6

OH

Tukang Kayu

L.03

0.06

OH

Kepala Tukang

L.04

0.003

OH

Mandor

B

Bahan

A.4.6.2.15

Buah

Rel Pintu Dorong

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1 Buah Pemasangan Kunci Lemari A

Tenaga

L.01

0.025

OH

Pekerja

L.02

0.25

OH

Tukang Kayu

L.03

0.025

OH

Kepala Tukang

L.04

0.00130

OH

Mandor

B

Bahan

1

13

A L.01

1

12

URAIAN PEKERJAAN

SAT.

A.4.6.2.16

1

Buah

Kunci Lemari

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Kaca tebal 3 mm

A

Tenaga

L.01

0.015

OH

Pekerja

L.02

0.15

OH

Tukang Kayu

L.03

0.015

OH

Kepala Tukang

L.04

0.00075

OH

Mandor

B

Bahan

1.1

m2 C

Kaca tebal 3mm PERALATAN

No.

14

SNI

KODE

A.4.6.2.17

KOEF

1

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Kaca tebal 5 mm

A

Tenaga

L.01

0.015

OH

Pekerja

L.02

0.15

OH

Tukang Kayu

L.03

0.015

OH

Kepala Tukang

L.04

0.00075

OH

Mandor

B

Bahan

1.1

15

URAIAN PEKERJAAN

SAT.

A.4.6.2.18

1

m2

Kaca tebal 5mm

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Kaca Cermin tebal 5 mm

A

Tenaga

L.01

0.015

OH

Pekerja

L.02

0.15

OH

Tukang Kayu

L.03

0.015

OH

Kepala Tukang

L.04

0.00075

OH

Mandor

B

Bahan

1.1

m2

Kaca Cermin

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

N PEKERJAAN KUNCI dan KACA 213,213.00 43,830.00 57,000.00

570.00

84,000.00

42,000.00

87,000.00

870.00

78,000.00

390.00 150,000.00

150,000.00

150,000.00

193,830.00 19,383.00

10%

213,213.00

144,006.50 42,915.00 57,000.00

285.00

84,000.00

42,000.00

87,000.00

435.00

78,000.00

195.00 88,000.00

88,000.00

88,000.00

130,915.00 13,091.50

10%

144,006.50

212,206.50 42,915.00 57,000.00

285.00

84,000.00

42,000.00

87,000.00

435.00

78,000.00

195.00 150,000.00

150,000.00

150,000.00

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

192,915.00 19,291.50

10%

212,206.50

25,679.50 15,345.00 57,000.00

855.00

84,000.00

12,600.00

87,000.00

1,305.00

78,000.00

585.00 8,000.00

8,000.00

8,000.00

23,345.00 2,334.50

10%

25,679.50

16,203.00 10,230.00 57,000.00

570.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

390.00 4,500.00

4,500.00

4,500.00

14,730.00 10%

1,473.00 16,203.00

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 43,756.90 24,279.00

57,000.00

5,700.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

39.00 15,500.00

15,500.00

15,500.00

39,779.00 3,977.90

10%

43,756.90

30,672.40 15,384.00 57,000.00

855.00

84,000.00

12,600.00

87,000.00

1,305.00

78,000.00

624.00 12,500.00

12,500.00

12,500.00

27,884.00 2,788.40

10%

30,672.40

384,334.50 49,395.00 57,000.00

2,850.00

84,000.00

42,000.00

87,000.00

4,350.00

78,000.00

195.00 300,000.00

300,000.00

300,000.00

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 349,395.00 34,939.50

10%

384,334.50

39,333.80 19,758.00 57,000.00

1,140.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

78.00 16,000.00

16,000.00

16,000.00

35,758.00 3,575.80

10%

39,333.80

340,866.90 9,879.00 57,000.00

570.00

84,000.00

8,400.00

87,000.00

870.00

78,000.00

39.00 300,000.00

300,000.00

300,000.00

309,879.00 10%

30,987.90 340,866.90

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 296,201.40 59,274.00

57,000.00

3,420.00

84,000.00

50,400.00

87,000.00

5,220.00

78,000.00

234.00 210,000.00

210,000.00

210,000.00

269,274.00 26,927.40

10%

296,201.40

32,671.54 24,701.40 57,000.00

1,425.00

84,000.00

21,000.00

87,000.00

2,175.00

78,000.00

101.40 5,000.00

5,000.00

5,000.00

29,701.40 2,970.14

10%

32,671.54

90,110.35 14,818.50 57,000.00

855.00

84,000.00

12,600.00

87,000.00

1,305.00

78,000.00

58.50 67,100.00

61,000.00

67,100.00

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 81,918.50 8,191.85

10%

90,110.35

103,420.35 14,818.50 57,000.00

855.00

84,000.00

12,600.00

87,000.00

1,305.00

78,000.00

58.50 79,200.00

72,000.00

79,200.00

94,018.50 9,401.85

10%

103,420.35

336,950.35 14,818.50 57,000.00

855.00

84,000.00

12,600.00

87,000.00

1,305.00

78,000.00

58.50 291,500.00

265,000.00

291,500.00

306,318.50 10%

30,631.85 336,950.35

No. XIII 1

SNI

KODE

KOEF

A.4.4.3

HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan D

A.4.4.3.2

1

A

Tenaga

OH

Pekerja

L.02

0.125

OH

Tukang Batu

L.03

0.013

OH

Kepala Tukang

L.04

0.013

OH

Mandor

B

Bahan

A.4.4.3.3

A.4.4.3.5

Pemasangan lantai Ubin PC Abu-abu Uk. 30 x 30 cm

0.25

Buah Ubin Abu-abu 30x30 cm

10.0

Kg

Portland Semen

0.0450

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan lantai Ubin PC Abu-abu Uk. 20 x 20 cm

A

Tenaga

L.01

0.27

OH

Pekerja

L.02

0.135

OH

Tukang Batu

L.03

0.014

OH

Kepala Tukang

L.04

0.014

OH

Mandor

B

Bahan

26.5

3

m2

L.01

11.87

2

URAIAN PEKERJAAN

SAT.

Buah Ubin Abu-abu 20x20 cm

10.4

Kg

Portland Semen

0.0450

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2 A

Pemasangan lantai Ubin PC Warna Uk. 30 x 30 cm Tenaga

No.

SNI

KODE

KOEF

L.01

0.26

OH

Pekerja

L.02

0.130

OH

Tukang Batu

L.03

0.013

OH

Kepala Tukang

L.04

0.013

OH

Mandor

B

Bahan

11.87

4

URAIAN PEKERJAAN

SAT.

A.4.4.3.6

Buah Ubin Warna 30x30 cm

10.0

Kg

Portland Semen

1.50

Kg

Semen warna

0.0450

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan lantai Ubin PC Warna Uk. 20 x 20 cm

A

Tenaga

L.01

0.27

OH

Pekerja

L.02

0.135

OH

Tukang Batu

L.03

0.014

OH

Kepala Tukang

L.04

0.014

OH

Mandor

B

Bahan

26.5

Buah Ubin Warna 20x20 cm

10.4

Kg

Portland Semen

1.62

Kg

Semen warna

0.0450

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

No.

SNI

5

A.4.4.3.9

KODE

KOEF 1

Pemasangan lantai Ubin Granito Uk. 40 x 40 cm

A

Tenaga

0.250

OH

Pekerja

L.02

0.125

OH

Tukang Batu

L.03

0.013

OH

Kepala Tukang

L.04

0.013

OH

Mandor

B

Bahan

A.4.4.3.16

Buah Ubin Granito 40x40 cm

9.8

Kg

Portland Semen

1.300

Kg

Semen warna

0.045

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Ubin Plin Pc.Abu-abu Uk. 15 x 20 cm

A

Tenaga

1

L.01

0.090

OH

Pekerja

L.02

0.090

OH

Tukang Batu

L.03

0.009

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

5.30

7

m2

L.01

6.63

6

URAIAN PEKERJAAN

SAT.

A.4.4.3.19

1.2

Kg

Portland Semen

0.045

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Ubin Plin Pc.Warna Uk. 10 x 20 cm

A

Tenaga

OH

Pekerja

1

L.01

Buah Ubin Plin Pc Abu-abu 15x20 cm

0.090

No.

SNI

KODE

KOEF

L.02

0.090

OH

Tukang Batu

L.03

0.009

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

2.65

8

URAIAN PEKERJAAN

SAT.

A.4.4.3.32

Buah Ubin Plin Pc SWarna 15x20 cm

1.14

Kg

Portland Semen

0.100

Kg

Semen Warna

0.003

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Lantai Keramik 10x 20 cm

A

Tenaga

L.01

0.70

OH

Pekerja

L.02

0.350

OH

Tukang Batu

L.03

0.035

OH

Kepala Tukang

L.04

0.035

OH

Mandor

B

Bahan

53.00

Buah Keramik 10 x 20 cm

8.2

Kg

Portland Semen

2.75

Kg

Semen Warna

0.0450

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

No.

SNI

9

A.4.4.3.33

KODE

KOEF 1

A

Tenaga

OH

Pekerja

L.02

0.350

OH

Tukang Batu

L.03

0.035

OH

Kepala Tukang

L.04

0.035

OH

Mandor

B

Bahan

A.4.4.3.34

A.4.4.3.35

Pemasangan lantai Keramik Uk. 10 x 10 cm / 5 x 20 cm

0.70

Buah Keramik 10 x 10 cm / 5 x 20 cm

8.19

Kg

Portland Semen

3.20

Kg

Semen Warna

0.0450

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Lantai Keramik 33 x 33 cm

A

Tenaga

L.01

0.70

OH

Pekerja

L.02

0.35

OH

Tukang Batu

L.03

0.035

OH

Kepala Tukang

L.04

0.035

OH

Mandor

B

Bahan

10

11

m2

L.01

106.00

10

URAIAN PEKERJAAN

SAT.

Buah Ubin Keramik 33 x 33 cm

8.19

Kg

Portland Semen

0.045

m3

Pasir Pasang

1.62

Kg

Semen Warna

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2 A

Pemasangan Lantai Keramik 30 x 30 cm Tenaga

No.

SNI

KODE

KOEF

L.01

0.70

OH

Pekerja

L.02

0.35

OH

Tukang Batu

L.03

0.035

OH

Kepala Tukang

L.04

0.035

OH

Mandor

B

Bahan

11.87

12

URAIAN PEKERJAAN

SAT.

A.4.4.3.36

Buah Ubin Keramik 30 x 30 cm

10.00

Kg

Portland Semen

0.045

m3

Pasir Pasang

1.50

Kg

Semen Warna

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Lantai Keramik 20 x 20 cm

A

Tenaga

L.01

0.70

OH

Pekerja

L.02

0.35

OH

Tukang Batu

L.03

0.035

OH

Kepala Tukang

L.04

0.035

OH

Mandor

B

Bahan

26.5

Buah Ubin Keramik 20 x 20 cm

10.40

Kg

Portland Semen

1.62

Kg

Semen Warna

0.045

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

No.

SNI

13

A.4.4.3.37

KODE

KOEF 1

m2

Pemasangan Lantai Keramik uk.10 x 33 cm, untuk varias

A

Tenaga

L.01

1.05

OH

Pekerja

L.02

0.525

OH

Tukang Batu

L.03

0.053

OH

Kepala Tukang

L.04

0.035

OH

Mandor

B

Bahan

33.0

14

URAIAN PEKERJAAN

SAT.

A.4.4.3.39

Buah Ubin Keramik

9.80

Kg

Portland Semen

4.37

Kg

Semen Warna

0.045

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Plint Keramik Ukuran 10x20 cm

A

Tenaga

1

L.01

0.09

OH

Pekerja

L.02

0.09

OH

Tukang Batu

L.03

0.009

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

5.3 Buah Ubin Keramik

15

A.4.4.3.40

1.14

Kg

Portland Semen

0.003

m3

Pasir Pasang

0.025

Kg

Semen Warna

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Plint Keramik Ukuran 10x10 cm

A

Tenaga

OH

Pekerja

1

L.01

0.09

No.

SNI

KODE

KOEF

URAIAN PEKERJAAN

SAT.

L.02

0.09

OH

Tukang Batu

L.03

0.009

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

10.6 Buah Ubin Keramik

16

A.4.4.3.41

1.14

Kg

Portland Semen

0.003

m3

Pasir Pasang

0.05

Kg

Semen Warna

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Plint Keramik Ukuran 5x20 cm

A

Tenaga

1

L.01

0.09

OH

Pekerja

L.02

0.09

OH

Tukang Batu

L.03

0.009

OH

Kepala Tukang

L.04

0.005

OH

Mandor

B

Bahan

10.6 Buah Ubin Keramik 1.14

Kg

Portland Semen

0.003

m3

Pasir Pasang

0.05

Kg

Semen Warna

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

No.

SNI

17

A.4.4.3.43

KODE

KOEF

URAIAN PEKERJAAN

SAT. 1

m2

Pemasangan Lantai Marmer Ukuran 1.00x1.00 cm

A

Tenaga

L.01

0.7

OH

Pekerja

L.02

0.35

OH

Tukang Batu

L.03

0.035

OH

Kepala Tukang

L.04

0.035

OH

Mandor

B

Bahan

1.06 buah Marmer

18

19

A.4.4.3.44

8.19

kg

Portland Semen

0.045

m3

Pasir Pasang

0.65

kg

Semen Warna

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Lantai Karpet

A

Tenaga

L.01

0.17

OH

Pekerja

L.02

0.17

OH

Tukang Batu

L.03

0.017

OH

Kepala Tukang

L.04

0.009

OH

Mandor

B

Bahan

1.05

m2

Karpet

0.35

kg

Lem

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.4.3.46

1

m2

Pemasangan Lantai Parquet Jati

A

Tenaga

L.01

0.70

OH

Pekerja

L.02

0.35

OH

Tukang Batu

L.03

0.035

OH

Kepala Tukang

No.

SNI

KODE L.04

20

21

A.4.4.3.48

KOEF

URAIAN PEKERJAAN

SAT.

0.035

OH

Mandor

B

Bahan

1.05

m2

Parquet Jati

0.6

Kg

Lem Vynil

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding Porselen 11 x 11 cm

A

Tenaga

L.01

1.00

OH

Pekerja

L.02

0.50

OH

Tukang Batu

L.03

0.050

OH

Kepala Tukang

L.04

0.050

OH

Mandor

B

Bahan

86

bh

Porselen

9.30

Kg

Portland Semen

2.750

Kg

Semen Warna

0.018

m3

Pasir Pasang

A.4.4.3.49

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Dinding Keramik 10x20 cm,

A

Tenaga

L.01

0.9

OH

Pekerja

L.02

0.45

OH

Tukang Batu

L.03

0.045

OH

Kepala Tukang

L.04

0.045

OH

Mandor

No.

SNI

KODE

KOEF

B 53

22

A.4.4.3.50

Bahan

Buah Keramik

9.3

Kg

Portland Semen

0.018

m3

Pasir Pasang

2.75

Kg

Semen Warna

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding Keramik 20x20 cm,

A

Tenaga

L.01

0.9

OH

Pekerja

L.02

0.45

OH

Tukang Batu

L.03

0.045

OH

Kepala Tukang

L.04

0.045

OH

Mandor

B

Bahan

26.0

23

URAIAN PEKERJAAN

SAT.

A.4.4.3.53

Buah Keramik

9.3

Kg

Portland Semen

0.018

m3

Pasir Pasang

1.94

Kg

Semen Warna

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding Keramik 10x20 cm,

A

Tenaga

L.01

0.9

OH

Pekerja

L.02

0.45

OH

Tukang Batu

L.03

0.045

OH

Kepala Tukang

L.04

0.045

OH

Mandor

B

Bahan

53.0 9.3

Buah Keramik Kg

Portland Semen

No.

23

SNI

KODE

A.4.4.3.54

KOEF 0.018

m3

Pasir Pasang

2.75

Kg

Semen Warna

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding Keramik 20x20 cm,

A

Tenaga

L.01

0.9

OH

Pekerja

L.02

0.45

OH

Tukang Batu

L.03

0.045

OH

Kepala Tukang

L.04

0.045

OH

Mandor

B

Bahan

26.5

24

URAIAN PEKERJAAN

SAT.

A.4.4.3.55

Buah Keramik

9.3

Kg

Portland Semen

0.018

m3

Pasir Pasang

1.94

Kg

Semen Warna

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding Marmer Ukuran 1.00x1.00 cm

A

Tenaga

L.01

1.3

OH

Pekerja

L.02

0.65

OH

Tukang Batu

L.03

0.065

OH

Kepala Tukang

L.04

0.065

OH

Mandor

No.

SNI

KODE

KOEF

URAIAN PEKERJAAN

SAT. B

Bahan

1.06 buah Marmer 3.003 buah Paku 12 cm

25

26

A.4.4.3.58

12.44

kg

Portlan Semen

0.025

m3

Pasir Pasang

0.65

kg

Semen Warna

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Dinding Batu Paros / Batu Tempel Hitam

A

Tenaga

L.01

0.70

OH

Pekerja

L.02

0.35

OH

Tukang Batu

L.03

0.035

OH

Kepala Tukang

L.04

0.035

OH

Mandor

B

Bahan

A.4.4.3.59

1.10

m2

Batu Paros

11.75

Kg

Portland Semen

0.035

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

Pemasangan Lantai Vynil uk.30 x 30 cm

A

Tenaga

L.01

0.35

OH

Pekerja

L.02

0.175

OH

Tukang Batu

L.03

0.017

OH

Kepala Tukang

L.04

0.002

OH

Mandor

B

Bahan

11.87

bh

Vynil 30x30cm

0.25

kg

Lem

No.

27

SNI

KODE

A.4.4.3.63

KOEF

URAIAN PEKERJAAN

SAT.

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Plint Kayu Klas II Ukuran 2x10 cm Tenaga

L.01

0.12

OH

Pekerja

L.02

0.12

OH

Tukang Batu

L.03

0.012

OH

Kepala Tukang

L.04

0.006

OH

Mandor Bahan

0.003

m3

Papan Kayu Klas II

0.05

kg

Paku Sekrup 5 cm

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

N PEKERJAAN PENUTUP LANTAI dan DINDING

tai Ubin PC Abu-abu Uk. 30 x 30 cm

95,297.50 26,895.00 57,000.00

14,250.00

84,000.00

10,500.00

87,000.00

1,131.00

78,000.00

1,014.00 59,739.09

11.1111111111

3,090.91

36,689.09

0.3

1,360.00

13,600.00

0.09

210,000.00

9,450.00

86,634.09 8,663.41

10%

95,297.50

tai Ubin PC Abu-abu Uk. 20 x 20 cm

tai Ubin PC Warna Uk. 30 x 30 cm

95,209.40 29,040.00 57,000.00

15,390.00

84,000.00

11,340.00

87,000.00

1,218.00

78,000.00

1,092.00 57,514.00

1,280.00

33,920.00

1,360.00

14,144.00

210,000.00

9,450.00

86,554.00 10%

8,655.40 95,209.40

124,293.50 27,885.00

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

57,000.00

14,820.00

84,000.00

10,920.00

87,000.00

1,131.00

78,000.00

1,014.00 85,109.09

4,090.91

48,559.09

1,360.00

13,600.00

9,000

13,500.00

210,000.00

9,450.00

112,994.09 11,299.41

10%

124,293.50

tai Ubin PC Warna Uk. 20 x 20 cm

120,575.40 29,040.00 57,000.00

15,390.00

84,000.00

11,340.00

87,000.00

1,218.00

78,000.00

1,092.00 80,574.00

1,600.00

42,400.00

1,360.00

14,144.00

9,000.00

14,580.00

210,000.00

9,450.00

109,614.00 10%

10,961.40 120,575.40

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

tai Ubin Granito Uk. 40 x 40 cm

347,075.30 26,895.00 57,000.00

14,250.00

84,000.00

10,500.00

87,000.00

1,131.00

78,000.00

1,014.00 288,628.00

0.4

38,333.33

254,150.00

0.16

1,360.00

13,328.00

6.25

9,000.00

11,700.00

210,000.00

9,450.00

315,523.00 31,552.30

10%

347,075.30

n Plin Pc.Abu-abu Uk. 15 x 20 cm

57,815.34 13,863.00 57,000.00

5,130.00

84,000.00

7,560.00

87,000.00

783.00

78,000.00

390.00 38,696.40

5,200.00

27,560.00

1,360.00

1,686.40

210,000.00

9,450.00

52,559.40 5,255.94

10%

57,815.34

n Plin Pc.Warna Uk. 10 x 20 cm

34,087.24 13,863.00 57,000.00

5,130.00

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

84,000.00

7,560.00

87,000.00

783.00

78,000.00

390.00 17,125.40

5,300.00

14,045.00

1,360.00

1,550.40

9,000.00

900.00

210,000.00

630.00

30,988.40 3,098.84

10%

34,087.24

189,588.74 75,075.00 57,000.00

39,900.00

84,000.00

29,400.00

87,000.00

3,045.00

78,000.00

2,730.00 97,278.40

980.00

51,940.00

1,360.00

11,138.40

9,000.00

24,750.00

210,000.00

9,450.00

172,353.40 10%

17,235.34 189,588.74

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

tai Keramik Uk. 10 x 10 cm / 5 x 20 cm

194,043.74 75,075.00 57,000.00

39,900.00

84,000.00

29,400.00

87,000.00

3,045.00

78,000.00

2,730.00 101,328.40

490.00

51,940.00

1,360.00

11,138.40

9,000.00

28,800.00

210,000.00

9,450.00

176,403.40 17,640.34

10%

194,043.74

186,045.52 75,075.00 57,000.00

39,900.00

84,000.00

29,400.00

87,000.00

3,045.00

78,000.00

2,730.00 94,057.29

5,888.89

58,888.89

1,360.00

11,138.40

210,000.00

9,450.00

9,000.00

14,580.00

169,132.29 10%

16,913.23 186,045.52

185,698.50 75,075.00

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

57,000.00

39,900.00

84,000.00

29,400.00

87,000.00

3,045.00

78,000.00

2,730.00 93,741.82

4,818.18

57,191.82

1,360.00

13,600.00

210,000.00

9,450.00

9,000.00

13,500.00

168,816.82 16,881.68

10%

185,698.50

187,537.90 75,075.00 57,000.00

39,900.00

84,000.00

29,400.00

87,000.00

3,045.00

78,000.00

2,730.00 95,414.00

2,160.00

57,240.00

1,360.00

14,144.00

9,000.00

14,580.00

210,000.00

9,450.00

170,489.00 10%

17,048.90 187,537.90

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

ntai Keramik uk.10 x 33 cm, untuk variasi / border

372,238.90 111,291.00 57,000.00

59,850.00

84,000.00

44,100.00

87,000.00

4,611.00

78,000.00

2,730.00 227,108.00

5,000.00

165,000.00

1,360.00

13,328.00

9,000.00

39,330.00

210,000.00

9,450.00

338,399.00 33,839.90

10%

372,238.90

32,470.24 13,863.00 57,000.00

5,130.00

84,000.00

7,560.00

87,000.00

783.00

78,000.00

390.00 15,655.40

2,500.00

13,250.00

1,360.00

1,550.40

210,000.00

630.00

9,000.00

225.00

29,518.40 2,951.84

10%

32,470.24

78,774.74 13,863.00 57,000.00

5,130.00

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

84,000.00

7,560.00

87,000.00

783.00

78,000.00

390.00 57,750.40

5,200.00

55,120.00

1,360.00

1,550.40

210,000.00

630.00

9,000.00

450.00

71,613.40 7,161.34

10%

78,774.74

76,442.74 13,863.00 57,000.00

5,130.00

84,000.00

7,560.00

87,000.00

783.00

78,000.00

390.00 55,630.40

5,000.00

53,000.00

1,360.00

1,550.40

210,000.00

630.00

9,000.00

450.00

69,493.40 10%

6,949.34 76,442.74

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

ntai Marmer Ukuran 1.00x1.00 cm

665,514.74 75,075.00 57,000.00

39,900.00

84,000.00

29,400.00

87,000.00

3,045.00

78,000.00

2,730.00 529,938.40

475,000.00

503,500.00

1,360.00

11,138.40

210,000.00

9,450.00

9,000.00

5,850.00

605,013.40 60,501.34

10%

665,514.74

187,771.10 26,151.00 57,000.00

9,690.00

84,000.00

14,280.00

87,000.00

1,479.00

78,000.00

702.00 144,550.00

125,000.00

131,250.00

38,000.00

13,300.00

170,701.00 17,070.10

10%

187,771.10

338,662.50 75,075.00 57,000.00

39,900.00

84,000.00

29,400.00

87,000.00

3,045.00

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

78,000.00

2,730.00 232,800.00

200,000.00

210,000.00

38,000.00

22,800.00

307,875.00 30,787.50

10%

338,662.50

212,301.29 107,250.00 57,000.00

57,000.00

84,000.00

42,000.00

87,000.00

4,350.00

78,000.00

3,900.00 85,751.17

518.29

44,573.17

82.6446280992

1,360.00

12,648.00

0.0121

9,000.00

24,750.00

0.11

210,000.00

3,780.00

193,001.17 19,300.12

10%

212,301.29

208,607.30 96,525.00 57,000.00

51,300.00

84,000.00

37,800.00

87,000.00

3,915.00

78,000.00

3,510.00

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 93,118.00 980.00

51,940.00

1,360.00

12,648.00

210,000.00

3,780.00

9,000.00

24,750.00

189,643.00 18,964.30

10%

208,607.30

200,654.30 96,525.00 57,000.00

51,300.00

84,000.00

37,800.00

87,000.00

3,915.00

78,000.00

3,510.00 85,888.00

2,000.00

52,000.00

1,360.00

12,648.00

210,000.00

3,780.00

9,000.00

17,460.00

182,413.00 18,241.30

10%

200,654.30

208,607.30 96,525.00 57,000.00

51,300.00

84,000.00

37,800.00

87,000.00

3,915.00

78,000.00

3,510.00 93,118.00

980.00

51,940.00

1,360.00

12,648.00

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

210,000.00

3,780.00

9,000.00

24,750.00

189,643.00 18,964.30

10%

208,607.30

201,754.30 96,525.00 57,000.00

51,300.00

84,000.00

37,800.00

87,000.00

3,915.00

78,000.00

3,510.00 86,888.00

2,000.00

53,000.00

1,360.00

12,648.00

210,000.00

3,780.00

9,000.00

17,460.00

183,413.00 18,341.30

10%

201,754.30

ding Marmer Ukuran 1.00x1.00 cm

738,153.36 139,425.00 57,000.00

74,100.00

84,000.00

54,600.00

87,000.00

5,655.00

78,000.00

5,070.00

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 531,623.51

475,000.00

503,500.00

35.00

105.11

1,360.00

16,918.40

210,000.00

5,250.00

9,000.00

5,850.00

671,048.51 67,104.85

10%

738,153.36

ding Batu Paros / Batu Tempel Hitam

223,195.50 75,075.00 57,000.00

39,900.00

84,000.00

29,400.00

87,000.00

3,045.00

78,000.00

2,730.00 127,830.00

95,000.00

104,500.00

1,360.00

15,980.00

210,000.00

7,350.00

202,905.00 20,290.50

10%

223,195.50

133,928.30 36,285.00 57,000.00

19,950.00

84,000.00

14,700.00

87,000.00

1,479.00

78,000.00

156.00 85,468.00

6,400.00

75,968.00

38,000.00

9,500.00

URAIAN PEKERJAAN

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

121,753.00 12,175.30

10%

133,928.30

nt Kayu Klas II Ukuran 2x10 cm

40,900.20 18,432.00 57,000.00

6,840.00

84,000.00

10,080.00

87,000.00

1,044.00

78,000.00

468.00 18,750.00

6,000,000.00

18,000.00

15,000.00

750.00

37,182.00 10%

3,718.20 40,900.20

No.

SNI

XIV

A.4.7.1

1

A.4.7.1.1

KODE

KOEF

HARGA SATUAN PEKERJAAN PENGECATAN 1

Pengikisan / pengerokan Permukaan Cat Tembok Lama

A

Tenaga

0.15

OH

Pekerja

L.04

0.0030

OH

Mandor

B

Bahan

Kg

Soda Api

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.7.1.2

1

m2 A

Tenaga

0.15

OH

Pekerja

L.04

0.0030

OH

Mandor

B

Bahan

Kg

Sabun

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.7.1.3

1

m2

10%

Pengerokan Karat Cat Lama permukaan Baja dg cara man

A

Tenaga

L.01

0.15

OH

Pekerja

L.04

0.0080

OH

Mandor

B

Bahan

Kg

Sabun

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

0.05

10%

Pencucian Bidang Permukaan Tembok yang Pernah dicat

L.01

0.05

3

m2

L.01

0.05

2

URAIAN PEKERJAAN

SAT.

10%

No.

SNI

4

A.4.7.1.4

5

KODE

KOEF

URAIAN PEKERJAAN

SAT. 1

m2

Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat das

A

Tenaga

L.01

0.070

OH

Pekerja

L.02

0.009

OH

Tukang Cat

L.03

0.006

OH

Kepala Tukang

L.04

0.003

OH

Mandor

B

Bahan

0.2000

kg

Cat Menie

0.1500

kg

Plamuur

0.1700

kg

Cat Dasar

0.2600

kg

Cat Penutup

0.0100

bh

Kuas

0.0300

kg

Pengencer

0.2000

lbr

Amplas

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.7.1.5

1

m2

10%

Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat das

A

Tenaga

L.01

0.070

OH

Pekerja

L.02

0.105

OH

Tukang Cat

L.03

0.004

OH

Kepala Tukang

L.04

0.003

OH

Mandor

No.

6

SNI

KODE

A.4.7.1.6

KOEF

B

Bahan

0.2000

kg

Cat Menie

0.1500

kg

Plamuur

0.1700

kg

Cat Dasar

0.3500

kg

Cat Penutup

0.0100

bh

Kuas

0.0300

kg

Pengencer

0.2000

lbr

Amplas

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2 A

Tenaga

0.04

OH

Pekerja

L.02

0.063

OH

Tukang Cat

L.03

0.063

OH

Kepala Tukang

L.04

0.0030

OH

Mandor

B

Bahan

Ltr

Teak Oil

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.7.1.7

1

L.01

0.04

m2

10%

Pelaburan Bidang Kayu dg Teak Oil

L.01

0.36

7

URAIAN PEKERJAAN

SAT.

Pelaburan Bidang Kayu dg Politur

A

Tenaga

OH

Pekerja

L.02

0.06

OH

Tukang Cat

L.03

0.016

OH

Kepala Tukang

L.04

0.0030

OH

Mandor

B

Bahan

0.15

Ltr

Politur

0.372

Ltr

Politur Jadi

2

Lbr

Ampelas

10%

No.

8

SNI

KODE

A.4.7.1.8

KOEF

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2 A

Tenaga

0.1

OH

Pekerja

L.04

0.006

OH

Mandor

B

Bahan

Ltr

Residu atau Ter

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.7.1.9

1

m2

10%

Pelaburan Bidang Kayu dg Cat Residu & Ter

L.01

0.35

9

URAIAN PEKERJAAN

SAT.

10%

Pelaburan Bidang Kayu dg Vernis

A

Tenaga

L.01

0.16

OH

Pekerja

L.02

0.16

OH

Tukang Cat

L.03

0.016

OH

Kepala Tukang

L.04

0.0030

OH

Mandor

B

Bahan

0.15

Ltr

Vernis

0.05

Ltr

Dempul

0.1

Lbr

Ampelas

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

10%

No.

SNI

10

A.4.7.1.10

KODE

KOEF

URAIAN PEKERJAAN

SAT. 1

m2

Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup)

11

12

A

Tenaga

L.01

0.02

OH

Pekerja

L.02

0.063

OH

Tukang Cat

L.03

0.0063

OH

Kepala Tukang

L.04

0.0030

OH

Mandor

B

Bahan

0.1

Kg

Plamir

0.1

Kg

Cat Dasar

0.26

Kg

Cat Penutup 2 kali

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.7.1.11

1

m2

Pengecatan Tembok Lama (1lap.Plamir, 2lap Cat Penutup

A

Tenaga

L.01

0.028

OH

Pekerja

L.02

0.042

OH

Tukang Cat

L.03

0.0042

OH

Kepala Tukang

L.04

0.0030

OH

Mandor

B

Bahan

0.12

Kg

Cat Dasar

0.18

Kg

Cat Penutup 2 kali

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.7.1.12

1

m2

10%

Pengecatan Tembok dengan Kalkarium

A

Tenaga

L.01

0.028

OH

Pekerja

L.02

0.042

OH

Tukang Cat

L.03

0.0042

OH

Kepala Tukang

10%

No.

SNI

KODE L.04

KOEF 0.0030

0.1

13

14

A.4.7.1.13

URAIAN PEKERJAAN

SAT.

1

OH

Mandor

B

Bahan

Kg

Kalkarium

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pelaburan Tembok dengan Kapur Sirih

A

Tenaga

L.01

0.150

OH

Pekerja

L.02

0.001

OH

Tukang Cat

L.03

0.0001

OH

Kepala Tukang

L.04

0.0025

OH

Mandor

B

Bahan

0.15

Kg

Kapur Sirih

0.1

lbr

Amplas

0.25

ikat

Alang-alang

A.4.7.1.14

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

10%

10%

Pelaburan Tembok lama dengan Kapur Sirih (pemeliharaa

A

Tenaga

L.01

0.040

OH

Pekerja

L.02

0.005

OH

Tukang Cat

L.03

0.0005

OH

Kepala Tukang

L.04

0.0025

OH

Mandor

No.

15

16

SNI

KODE

A.4.7.1.15

KOEF

URAIAN PEKERJAAN

SAT. B

Bahan

0.30

Kg

Kapur Sirih

0.2

lbr

Amplas

0.25

ikat

Alang-alang

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Wallpaper

A

Tenaga

L.01

0.020

OH

Pekerja

L.02

0.200

OH

Tukang Cat

L.03

0.0200

OH

Kepala Tukang

L.04

0.0025

OH

Mandor

B

Bahan

1.20

lbr

Wall Paper

0.2

kg

Lem

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.7.1.16

1

m2

10%

Pengecatan Permukaan Baja dg Meni Besi

A

Tenaga

L.01

0.02

OH

Pekerja

L.02

0.2

OH

Tukang Cat

L.03

0.002

OH

Kepala Tukang

L.04

0.0025

OH

Mandor

B

Bahan

0.1

Kg

Meni Besi

0.01

Kg

Perekat / Lem

C

PERALATAN

D

Jumlah A + B + C

10%

No.

17

SNI

KODE

A.4.7.1.17

KOEF

URAIAN PEKERJAAN

SAT.

1

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m2

10%

Pengecatan Permukaan Baja dg Meni Besi & Perancah

A

Tenaga

L.01

0.25

OH

Pekerja

L.02

0.225

OH

Tukang Cat

L.03

0.0225

OH

Kepala Tukang

L.04

0.0075

OH

Mandor

B

Bahan

0.1

Kg

Meni Besi

0.01

Kg

Perekat / Lem

0.002

m3

Perancah Kayu

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

10%

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

engerokan Permukaan Cat Tembok Lama

10,349.90 8,784.00 57,000.00

8,550.00

78,000.00

234.00 625.00

12,500.00

625.00

9,409.00 940.90 10,349.90

dang Permukaan Tembok yang Pernah dicat

10,349.90 8,784.00 57,000.00

8,550.00

78,000.00

234.00 625.00

12,500.00

625.00

9,409.00 940.90 10,349.90

arat Cat Lama permukaan Baja dg cara manual

10,778.90 9,174.00 57,000.00

8,550.00

78,000.00

624.00 625.00

12,500.00

625.00

9,799.00 979.90 10,778.90

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

idang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penut

39,652.80 5,502.00

57,000.00

3,990.00

84,000.00

756.00

87,000.00

522.00

78,000.00

234.00

30,546.00 28,000.00

5,600.00

28,000.00

4,200.00

35,000.00

5,950.00

52,000.00

13,520.00

7,600.00

76.00

14,000.00

420.00

3,900.00

780.00

36,048.00 3,604.80 39,652.80

idang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penut

53,479.80 13,392.00

57,000.00

3,990.00

84,000.00

8,820.00

87,000.00

348.00

78,000.00

234.00

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 35,226.00

28,000.00

5,600.00

28,000.00

4,200.00

35,000.00

5,950.00

52,000.00

18,200.00

7,600.00

76.00

14,000.00

420.00

3,900.00

780.00

48,618.00 4,861.80 53,479.80

30,851.70 13,287.00 57,000.00

2,280.00

84,000.00

5,292.00

87,000.00

5,481.00

78,000.00

234.00 14,760.00

41,000.00

14,760.00

28,047.00 2,804.70 30,851.70 40,814.40 8,946.00 57,000.00

2,280.00

84,000.00

5,040.00

87,000.00

1,392.00

78,000.00

234.00 28,158.00

39,000.00

5,850.00

39,000.00

14,508.00

3,900.00

7,800.00

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

37,104.00 3,710.40 40,814.40 7,862.80 6,168.00 57,000.00

5,700.00

78,000.00

468.00 980.00

2,800.00

980.00

7,148.00 714.80 7,862.80 32,698.60 24,186.00 57,000.00

9,120.00

84,000.00

13,440.00

87,000.00

1,392.00

78,000.00

234.00 5,540.00

25,000.00

3,750.00

28,000.00

1,400.00

3,900.00

390.00 -

29,726.00 2,972.60 32,698.60

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 17,285.51

7,214.10 57,000.00

1,140.00

84,000.00

5,292.00

87,000.00

548.10

78,000.00

234.00 8,500.00

21,000.00

2,100.00

12,000.00

1,200.00

20,000.00

5,200.00

15,714.10 1,571.41 17,285.51

embok Lama (1lap.Plamir, 2lap Cat Penutup)

11,839.74 5,723.40 57,000.00

1,596.00

84,000.00

3,528.00

87,000.00

365.40

78,000.00

234.00 5,040.00

12,000.00

1,440.00

20,000.00

3,600.00

10,763.40 1,076.34 11,839.74

6,768.74 5,723.40 57,000.00

1,596.00

84,000.00

3,528.00

87,000.00

365.40

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp

78,000.00

234.00 430.00

4,300.00

430.00 -

6,153.40 615.34 6,768.74

11,855.47 8,837.70 57,000.00

8,550.00

84,000.00

84.00

87,000.00

8.70

78,000.00

195.00 1,940.00

7,500.00

1,125.00

3,900.00

390.00

1,700.00

425.00

10,777.70 1,077.77 11,855.47

mbok lama dengan Kapur Sirih (pemeliharaan)

5,976.85 2,938.50 57,000.00

2,280.00

84,000.00

420.00

87,000.00

43.50

78,000.00

195.00

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 2,495.00 4,300.00

1,290.00

3,900.00

780.00

1,700.00

425.00

5,433.50 543.35 5,976.85

76,422.50 19,875.00 57,000.00

1,140.00

84,000.00

16,800.00

87,000.00

1,740.00

78,000.00

195.00 49,600.00

35,000.00

42,000.00

38,000.00

7,600.00

69,475.00 6,947.50 76,422.50

22,867.90 18,309.00 57,000.00

1,140.00

84,000.00

16,800.00

87,000.00

174.00

78,000.00

195.00 2,480.00

21,000.00

2,100.00

38,000.00

380.00

20,789.00

HARGA BAHAN/UPAH

JUMLAH

Rp

Rp 2,078.90 22,867.90

46,389.75 35,692.50 57,000.00

14,250.00

84,000.00

18,900.00

87,000.00

1,957.50

78,000.00

585.00 6,480.00

21,000.00

2,100.00

38,000.00

380.00

2,000,000.00

4,000.00

42,172.50 4,217.25 46,389.75

Related Documents

Rab
June 2020 33
Rab Mess.xlsx
November 2019 44
Rab Material.xlsx
October 2019 47
Contoh Rab
May 2020 30
Rab Gizi.doc
November 2019 30
Rab Gpura.docx
December 2019 24

More Documents from "Nanang Sulistiyanto"

Bab 2.docx
December 2019 12
Rab Complete.xlsx
December 2019 20
Jadual Kata
May 2020 27
Pengesahan Icim.docx
July 2020 21