Pip St Presentation April 09 Final

  • Uploaded by: ConcepSys Solutions LLC
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Pip St Presentation April 09 Final as PDF for free.

More details

  • Words: 309
  • Pages: 29
ConcepSys Solutions LLC Adnan Siddiqui, P.E., Principal



Founded in late 2008 to improve the frontend engineering process.



At PIP ST today to show how PIP practices fit into a new integrated tool, ConcepSys.



Offering PIP members early trial access and 25% subscription discount for sign up by June 31, 2009



Bernie



Ken, Rick, Nancy, and the rest of the PIP staff



Member companies (new and old!)



Overview of ConcepSys



Demonstration of how PIP Practices will be integrated into ConcepSys



Questions



More ideas than money or people



Poor or incomplete scope definition



Data and role silos increase project evaluation time and costs.



Sunk costs for non-approved projects can be significant even for factored estimates



ConcepSys § Quickly evaluate multiple flowsheet options § Relevant documents and drawings updated

instantaneously after any design changes. § Automated basic engineering calculations § Real-time factored estimates (+/- 25%) § Empower the process engineer to evaluate more

options in less time



Achievement of “critical mass” by PIP practices now allows creation of new engineering tools to help capture the 6% capital cost reduction



Electronic datasheets



Pipe specs



Engineering guidelines



Live demo available at www.concepsyssolutions.com



Screenshots on following slides



Contact Adnan at [email protected] or (832) 228 0327 for trial access



Select unit operation



Verify / enter critical design parameters



Evaluate cost options



Select lines



Verify pipe specification



Add inline objects



Overall plant dimensions



Equipment arrangement



Apply layout rules of thumb



Verify NPSH for pumps



Evaluate pipe length options



Equipment List



Line List



Tie Point List



3D Layout



Itemized Cost Report



Adjust factors



Evaluate what-if options to link equipment size, material of construction, and layout with cost estimate

Questions?

Related Documents

Pip - Final
November 2019 17
Pip Final Report
June 2020 4
April Presentation
April 2020 7
Pip
July 2020 8

More Documents from ""