PEKERJAAN DINDING (SNI 6897 : 2008) 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS NO.
A.
B.
C.
URAIAN
SATUAN
KOEFISIEN
TENAGA Pekerja Tukang Batu Kepala Tukang Mandor
OH OH OH OH
0.3000 0.1000 0.0100 0.0150 JUMLAH TENAGA KERJA
BAHAN Bata Merah 5 x 11 x 22 cm Semen Portland Pasir Pasang
bh kg m3
70.0000 14.3700 0.0400 JUMLAH HARGA BAHAN
PERALATAN JUMLAH HARGA ALAT
D. E. F.
Jumlah (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D+E)
0
%xD
PEKERJAAN KAYU (SNI 3434 : 2008) MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I NO.
A.
B.
C.
URAIAN
SATUAN
KOEFISIEN
TENAGA Pekerja Tukang kayu Kepala Tukang Mandor
OH OH OH OH
7.0000 21.0000 2.1000 0.3500 JUMLAH TENAGA KERJA
BAHAN Balok Kayu Jati Paku 10 Cm Lem Kayu
m3 Kg Kg
1.1000 1.2500 1.0000 JUMLAH HARGA BAHAN
PERALATAN JUMLAH HARGA ALAT
D.
Jumlah (A + B + C)
E. F.
Overhead & Profit Harga Satuan Pekerjaan (D+E)
0
%xD
MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS II NO. URAIAN SATUAN KOEFISIEN
A.
B.
C.
TENAGA Pekerja Tukang kayu Kepala Tukang Mandor
OH OH OH OH
0.8000 2.4000 0.2400 0.0400 JUMLAH TENAGA KERJA
BAHAN Papan Kayu Kamper Lem Kayu
m3 Kg
0.0240 0.3000 JUMLAH HARGA BAHAN
PERALATAN JUMLAH HARGA ALAT
D. E. F.
Jumlah (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D+E)
0
%xD
MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I NO. URAIAN SATUAN KOEFISIEN
A.
B.
C.
TENAGA Pekerja Tukang kayu Kepala Tukang Mandor
OH OH OH OH
0.8000 2.4000 0.2400 0.0400 JUMLAH TENAGA KERJA
BAHAN Papan Kayu Jati Paku 1-2,5 Cm Lem Kayu Teakwood 4 mm uk 90x220 c
m3 Kg Kg Lbr
0.0250 0.0300 0.3000 1.0000 JUMLAH HARGA BAHAN
PERALATAN JUMLAH HARGA ALAT
D. E.
Jumlah (A + B + C) Overhead & Profit
0
%xD
F.
Harga Satuan Pekerjaan (D+E)
HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
80,000.00 100,000.00 115,000.00 130,000.00
24,000.00 10,000.00 1,150.00 1,950.00 37,100.00
1,500.00 1,450.00 400,000.00
105,000.00 20,836.50 16,000.00 141,836.50
178,936.50 178,936.50
KELAS I HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
80,000.00 110,000.00 115,000.00 130,000.00
560,000.00 2,310,000.00 241,500.00 45,500.00 3,157,000.00
32,000,000.00 17,297.78 18,900.00
35,200,000.00 21,622.22 18,900.00 35,240,522.22
38,397,522.22
38,397,522.22
II HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
80,000.00 110,000.00 115,000.00 130,000.00
64,000.00 264,000.00 27,600.00 5,200.00 360,800.00
10,100,000.00 18,900.00
242,400.00 5,670.00 248,070.00
608,870.00 608,870.00
HARGA SATUAN (Rp.)
JUMLAH HARGA (Rp.)
80,000.00 110,000.00 115,000.00 130,000.00
64,000.00 264,000.00 27,600.00 5,200.00 360,800.00
37,500,000.00 17,297.78 18,900.00 84,700.00
937,500.00 518.93 5,670.00 84,700.00 1,028,388.93
1,389,188.93 -
1,389,188.93
NO 1 2 2 3
URAIAN PEKERJAAN 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS MBMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS II MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I
TOT
Rencana Anggaran Biaya
OTAL BIAYA
JUMLAH
SAT
220.020
m2
0.47500
m3
19.700
m2
2.580
m2
HARGA SATUAN (Rp) Rp
178,936.50
Rp
38,397,522.22
Rp
608,870.00
Rp
1,389,188.93
JUMLAH HARGA (Rp) Rp
39,369,608.73
Rp
18,238,823.06
Rp
11,994,739.00
Rp
3,584,107.45
Rp
73,187,278.23