NO. A.
B.
C.
MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS II KOEFISIEN HARGA SATUAN URAIAN SATUAN (Rp.) TENAGA Pekerja Tukang kayu Kepala Tukang Mandor
OH OH OH OH
4.0000 12.0000 1.2000 0.2000 JUMLAH TENAGA KERJA
80,000.00 110,000.00 115,000.00 130,000.00
BAHAN Balok Kayu Kamper Besi Strip Tebal 5 cm Paku 12 Cm
m3 Kg Kg
1.1000 15.0000 5.6000 JUMLAH HARGA BAHAN
9,100,000.00 11,960.00 17,297.78
PERALATAN JUMLAH HARGA ALAT
D. E. F.
NO. A.
B.
C.
Jumlah (A + B + C) Overhead & Profit 0 Harga Satuan Pekerjaan (D+E)
%xD
MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II KOEFISIEN HARGA SATUAN URAIAN SATUAN (Rp.) TENAGA Pekerja Tukang kayu Kepala Tukang Mandor
OH OH OH OH
2.4000 7.2000 0.7200 0.1200 JUMLAH TENAGA KERJA
80,000.00 110,000.00 115,000.00 130,000.00
BAHAN Balok Kayu Jati Besi Strip Tebal 5 cm Paku 12 Cm
m3 Kg Kg
1.1000 15.0000 3.0000 JUMLAH HARGA BAHAN
9,100,000.00 11,960.00 17,297.78
PERALATAN JUMLAH HARGA ALAT
D. E. F.
Jumlah (A + B + C) Overhead & Profit 0 Harga Satuan Pekerjaan (D+E)
%xD
NO. A.
B.
C.
MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II KOEFISIEN HARGA SATUAN URAIAN SATUAN (Rp.) TENAGA Pekerja Tukang kayu Kepala Tukang Mandor
OH OH OH OH
0.1000 0.1000 0.0100 0.0050 JUMLAH TENAGA KERJA
80,000.00 110,000.00 115,000.00 130,000.00
BAHAN Kaso-Kaso ( 5 x 7 ) C Reng ( 2 x 3 ) Cm Paku 5 Cm dan 10 C
m3 Kg Kg
0.0140 0.0036 0.2500 JUMLAH HARGA BAHAN
6,700,000.00 8,100,000.00 17,297.78
PERALATAN JUMLAH HARGA ALAT
D. E. F.
NO. A.
B.
C.
Jumlah (A + B + C) Overhead & Profit 0 Harga Satuan Pekerjaan (D+E)
%xD
MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS II KOEFISIEN HARGA SATUAN URAIAN SATUAN (Rp.) TENAGA Pekerja Tukang kayu Kepala Tukang Mandor
OH OH OH OH
0.1000 0.2000 0.0200 0.0050 JUMLAH TENAGA KERJA
80,000.00 110,000.00 115,000.00 130,000.00
BAHAN Papan Kayu Kamper Paku 7 Cm dan 10 C
m3 Kg
0.0108 0.1000 JUMLAH HARGA BAHAN
10,100,000.00 17,297.78
PERALATAN JUMLAH HARGA ALAT
D. E. F.
Jumlah (A + B + C) Overhead & Profit 0 Harga Satuan Pekerjaan (D+E)
%xD
AYU KELAS II JUMLAH HARGA (Rp.)
320,000.00 1,320,000.00 138,000.00 26,000.00 1,804,000.00 10,010,000.00 179,400.00 96,867.56 10,286,267.56
12,090,267.56 12,090,267.56
JUMLAH HARGA (Rp.)
192,000.00 792,000.00 82,800.00 15,600.00 1,082,400.00 10,010,000.00 179,400.00 51,893.33 10,241,293.33
11,323,693.33 11,323,693.33
JUMLAH HARGA (Rp.)
8,000.00 11,000.00 1,150.00 650.00 20,800.00 93,800.00 29,160.00 4,324.44 127,284.44
148,084.44 148,084.44
JUMLAH HARGA (Rp.)
8,000.00 22,000.00 2,300.00 650.00 32,950.00 109,080.00 1,729.78 110,809.78
143,759.78 143,759.78
REN NO 1 2 2 3
TOTAL
RENCANA AN URAIAN PEKERJAAN MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS II MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS II
TOTAL BIAYA
NA ANGGARAN BIAYA
YA
JUMLAH
SATUAN
HARGA SATUAN (Rp)
1.661
M3
Rp
12,090,267.556
0.204
M3
Rp
11,323,693.333
156.900
M2
Rp
148,084.444
46.604
M
Rp
143,759.78
JUMLAH HARGA (Rp) Rp
20,081,934.41
Rp
2,310,033.44
Rp
23,234,449.33
Rp
6,699,780.68
Rp
52,326,197.87