PRESUPUESTO CONTRATADO (INC. IGV)
INICIO 28-May
0.00%
4-Jun
3.00%
11-Jun
6.00%
18-Jun
9.00%
25-Jun
12.00%
2-Jul
16.00%
9-Jul
22.00%
16-Jul
32.00%
23-Jul
45.00%
30-Jul
57.00%
6-Aug 13-Aug 20-Aug 27-Aug 4-Oct
71.00% 85.00% 95.00% 98.00% 100.00%
CURVA S Avance P rogramado
% DE AVANCE ACUMULADO
AVANCE PROGRAMADO
Avance Ej ecutado
Avance Programado
Avance Ej ecutado
120.00%
100.00%
98.00%
100.00%
95.00%
85.00%
80.00% 71.00%
3.42%
19.30%
9-Jul
19.30%
16-Jul
22.56%
23-Jul
26.63%
30-Jul
32.07%
57.00%
45.00%
40.00% 32.07%
32.00%
6-Aug
26.63%
13-Aug
19.24%
20.00%
4-Oct
6.00% 6.48%
22.00% 19.30%
22.56%
7/16/2017
7/9/2017
7/2/2017
6/11/2017
3.42% 3.00%
6/4/2017
0.00%
5/28/2017
96.94
0.00% 0.00%
19.30% 16.00%
12.00% 12.28% 9.00%
6/18/2017
27-Aug
6/25/2017
20-Aug
PLAZO DE EJECUCION DE OBRA EN SEMANAS
10/4/2017
2-Jul
60.00%
8/27/2017
19.24%
8/20/2017
25-Jun
8/13/2017
6.48% 12.28%
8/6/2017
11-Jun 18-Jun
7/30/2017
4-Jun
0.00%
7/23/2017
28-May
INICIO
SUPERVISION SUPERVISION
"CONSTRUCCION DEL CENTRO DE INSTRUCCIÓN TECNICA COMUNIDAD CAMPESINA SEGUNDA ETAPA" VOLCAN COMPAÑÍA MINERA S.A.A. DISTRITO YAULI PROVINCIA LA OROYA DEPARTAMENTO JUNIN ING. RUBEN LARENAS ING. ROY CRUZ ARZAPALO S/.201,797.17+IGV
AVANCE EJECUTADO
OBRA PROP. UBICACIÓN
FICHA TÉCNICA DE LA OBRA 1.00
OBRA
"CONSTRUCCION DEL CENTRO DE INSTRUCCIÓN TECNICA COMUNIDAD CAMPESINA SEGUN
2.00
PROPIETARIO
VOLCAN COMPAÑÍA MINERA S.A.A.
3.00
EJECUTA
ECOSERMY
4.00
UBICACIÓN:
LUGAR
CENTRO DE INSTRUCCIÓN TECNICA
DISTRITO
YAULI
PROVINCIA
LA OROYA
DEPARTAMENTO
JUNIN S/.201,797.17+IGV
5.00
PRESUPUESTO INC. IGV
6.00
PLAZO DE EJECUCION
7.00
INICIO OFICIAL DEL PLAZO
8.00
SUPERVISION VOLCAN
ING. RUBEN LARENAS
9.00
SUPERVISION ECOSERMY
ING. ROY CRUZ ARZAPALO
COMUNIDAD CAMPESINA SEGUNDA ETAPA"
#VALUE!
OBRA : CLIENTE: UBICACIÓN: CONTRATISTA:
"CONSTRUCCION DEL CENTRO DE INSTRUCCIÓN TECNICA COMUNIDAD CAMPESINA SEGUNDA ETAPA" VOLCAN COMPAÑÍA MINERA S.A.A. CENTRO DE INSTRUCCIÓN TECNICA ECOSERMY
CALENDARIO DE AVANCE DE OBRA VALORIZADO A LA FECHA DE INI N°
01 02 03 04
DESCRIPCION
C. D. (S/.)
FEBRERO 2017
MARZO 2017
01/02 - 28/02
01/03 - 31/03
31
30
31
61
ESTRUCTURAS ARQUITECTURA INSTALACIONES SANITARIAS INSTALACIONES ELECTRICAS
117,280.98 283,116.79 23,329.37 37,187.43
16,240.13 14,561.52 0.00 0.00
22,112.73 20,258.79 0.00 0.00
CD
460,914.57
30,801.65
42,371.52
460,914.57 69,137.19 46,091.46 576,143.21 103,705.78 679,848.99
30,801.65 4,620.25 3,080.17 38,502.06 6,930.37 45,432.43
42,371.52 6,355.73 4,237.15 52,964.40 9,533.59 62,497.99
Feb-17 6.68% 6.68%
Mar-17 9.19% 15.88%
TOTAL COSTO DIRECTO GASTOS GENERALES UTILIDAD SUB TOTAL IGV (18.00%) TOTAL PRESUPUESTO
PORCENTAJE PARCIAL PORCENTAJE ACUMULADO
ESINA SEGUNDA ETAPA" PLAZO DE EJECUCION: INICIO DE OBRA:
120 2/1/2017
LA FECHA DE INICIO DE OBRA ABRIL 2017
MAYO 2017
01/04 - 30/04
01/05 - 31/05
31
30
92
122
27,985.28 248,296.48 3,161.80 25,794.19
50,942.84 0.00 20,167.57 11,393.24
117,280.98 283,116.79 23,329.37 37,187.43
305,237.75
82,503.65
460,914.57
305,237.75 45,785.66 30,523.78 381,547.19 68,678.49 450,225.68
82,503.65 12,375.55 8,250.37 103,129.56 18,563.32 121,692.88
460,914.57 69,137.19 46,091.46 576,143.21 103,705.77 679,848.98
Apr-17 66.22% 82.10%
May-17 17.90% 100.00%
TOTAL