RESUMEN DE VALORIZACION N° 03 - MES DE ENERO DEL 201 Obra:

MEJORAMIENTO DEL SERVICIO DE EDUCACIÓN PRIMARIA DE LA INSTITUCIÓN EDUCATIVA N° 1 CENTRO POBLADO CAPOTE - DISTRITO DE PICSI - CHICLAYO - LAMBAYEQU supervisor: ING RONY ANIBAL POQUIOMA GAMARRA CIP: 77643

DESCRIPCIÓN

MONTO CONTRATO

VAL. ACUM. ANTERIOR

VAL ACTUAL

PRESUPUESTO :

2,309,067.98

395,604.10

307,229.46

TOTAL CONTRATADO (S/IGV) % DE AVANCE DE OBRA A LA FECHA % DE AVANCE DE OBRA PROGRAMADO SITUACIÓN ACTUAL

2,309,067.98

395,604.10 17.13% 6.34%

307,229.46 13.31% 20.79%

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

39,560.40 83,553.55 123,113.95 272,490.15 0.00

30,722.95 111,642.82 142,365.76 164,863.70 0.00

272,490.15 49,048.23 321,538.38 0.00

164,863.70 29,675.47 194,539.17 0.00

REAJUSTES ( R ) PRESUPUESTO : DRNC POR ADELANTO DIRECTO (-) DRNC POR ADELANTO MATERIALES (-) TOTAL REAJUSTES (R) TOTAL REAJUSTES (R) EN LA PRESENTE VALORIZACIÓN AMORTIZACIONES (A) Amortización del Adelanto Directo Amortización del Adelanto para Materiales TOTAL AMORTIZACIONES (A) VALORIZACION NETA (VN=VA+R-A) MULTA POR ATRASO DE OBRA (M) MONTO A PAGAR AL CONTRATISTA En efectivo (VN-M) En IGV (VN x 18%) MONTO TOTAL CON IGV S/. RETENCIÓN GARANTÍA FIEL CUMPLIMIENTO. No procede porque cuenta con Carta Fianza TOTAL COMPROMISO S/.

230,906.80 461,813.59 692,720.39

194,539.17

S DE ENERO DEL 2019

NSTITUCIÓN EDUCATIVA N° 11134 - PRIMARIO DEL SI - CHICLAYO - LAMBAYEQUE

VAL. ACUM % DE AVANCE ACTUAL

SALDO POR VALORIZAR

702,833.56

30.44%

1,606,234.42

702,833.56 30.44% 27.13%

30.44%

1,606,234.42

69.56%

ADELANTADA

0.00 0.00 0.00 0.00

70,283.35 195,196.37 265,479.72 437,353.84 0.00 437,353.84 78,723.69 516,077.53 0.00

160,623.45 266,617.22 427,240.68

CURVA "S" - SUPERVISION

120.00 100.00

100.00

91.01

Porcentaje

80.00

66.95

60.00 40.00

46.45 37.38

30.44 27.13

20.00 7.98 1.71 0.00 1

17.13

MES

1

2

3

4

5

6

7

VALORIZ. PROGRAMADA %

1.71

4.63

20.79

19.32

20.50

24.06

8.99

VALORIZ. EJECUTADA %

7.98

9.16

13.31

6.95

VALORIZ. PROGRAMADA ACUMULADA %

1.71

6.34

27.13

46.45

66.95

91.01

100.00

VALORIZ. EJECUTADA ACUMULADA %

7.98

17.13

30.44

37.38

MES 1:

6.34 2

3 4 AVANCE PROGRAMADO Axis Title

19 DE NOVIEMBRE AL 30 DE NOVIEMBRE DEL 2018

AVANCE EJECUTADO 5

6

7

MES 2: MES 3: MES 4: MES 5: MES 6: MES 7:

01 DE DICIEMBRE AL 31 DE DICIEMBRE DEL 2018 01 DE ENERO AL 31 DE ENERO DEL 2019 01 DE FEBRERO AL 28 DE FEBRERO DEL 2019 01 DE MARZO AL 31 DE MARZO DEL 2019 01 DE ABRIL AL 30 DE ABRIL DEL 2019 01 DE MAYO AL 17 DE MAYO DEL 2019