Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
OPNAME BOWPLANK
NO
ITEM PEKERJAAN
ANALISA
VOLUME
SATUAN
5
Lembar
5
Batang
1 1. Papan 2/20 Panjang = = (8,5X2)+(11X2) = 39 m
Volume = 39
=
2π₯4
39 8
= 4,875β 5
2. Kayu 5/7 Panjang = 1 m Volume 1 = =(
11 4
β1 ) x 3
= 5,25β 6x2=12m
Volume 2 = =(
8,5 4
β1 ) x 3
= 3,375β4x2=8m
Total volume = (12m + 8 m )= 20m 20π 4π
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
= 5 btg
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
OPNAME SLOOF
NO
ITEM PEKERJAAN
ANALISA
VOLUME
SATUAN
1
Lembar
2
Batang
1 Sloof L
1. Papan 2/20 Panjang 1= = (100X2) = 200 cm Panjang 2= = (100X2) = 200 cm Total Panjang = 400 cm
Volume = 400 400
= 1
2. Kayu 5/7 Panjang bidang 1 = 100 cm Volume 1 = 1
=(2)x2 = 100 Panjang bidang 2 = 100 cm Volume 1 = 1
=(2)x2 =1
Total 1+1 = 2 KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
Volume
=
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
2.
Sloof T
1.Papan 2/20 Panjang bidang 1= = (100X2) = 200 cm Panjang bidang 2= = (100X2) = 200 cm Panjang bidang 3= = (100X2) = 200 cm Total Panjang = 200+200+200 =600 cm
Volume = 600 400
2
= 1,5 β 2
2. Kayu 5/7 Panjang bidang 1 = 200 cm Panjang bidang 2 = 200 cm Panjang bidang 3 = 200 cm Total Panjang = 600 cm
Volume Bidang 1 = 200 3
= 66,66
Volume Bidang 2 = 200 3
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
= 66,66
KHAIRINNISA ZAKWANI
1701022009
Lembar
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
Volume Bidang 3 = 200 4
= 50
Total Volume = 182 cm 400
V = 182 = 2,19 β 3
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
3
KHAIRINNISA ZAKWANI
1701022009
Batang
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
OPNAME DINDING
NO 1
ITEM PEKERJAAN
ANALISA
VOLUME
SATUAN
Dinding 1. Multiplek 1,8 cm - Luas dinding bagian luar P = 244 L = 488 =PxL = 244 x 488 = 119072 cm2 - Luas 1 lbr multiplek = 244 x 122 = 29768 cm2 Volume = 119072 29768
=4β5
- Luas dinding bagian dalam P = 244 L = 396 =PxL = 244 x 396 = 96624 cm2 Volume = 96624 29768
= 3,245 β 4
Total Multiplek = 4+4 = 8 KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
8
KHAIRINNISA ZAKWANI
1701022009
Lembar
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
2. Girder 13
-Girder 270
Buah
-Girder 360
5
Buah
3. RSS
6
Buah
4. Kickets
6 4
5. Fario
10
6. Baji Besar 7. Baji Kecil
6
Buah
Buah Buah Buah
8. Counter Pin =4x6 = 24
24
Buah
9. Steel Wale
8
Buah
10. Counter Plate
16
Buah
11. Wedged Head 12
Piece
Buah
12. Base Plate for RSS
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
6
KHAIRINNISA ZAKWANI
1701022009
Buah
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
OPNAME KOLOM
NO 1
ITEM PEKERJAAN
ANALISA
VOLUME
SATUAN
8
Lembar
3
Batang
Kolom Konvensional 1 1. Papan 2/20 Panjang = = (40X4) = 160 cm Volume = 160 20
= 8 πΏπππππ ο·
Keterangan:
-Tinggi Kolom =3m -Kelebihan setiap papan =1X8 =8m = 2 lembar ο·
Sisa
= 8 lbr β 2 lbr = 6 lbr
2.
Sabuk
Kolom
Kayu Ukuran 5/7 Panjang : = 70 x 4 = 280 = 280 x 3 = 840 Volume 840
= ( 400 ) = 2,1 β 3
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
3. Skor ο·
Papan 2/20
2
Lembar
ο·
Kayu 5/7
1
Batang
Total Papan 2/20
10
Lembar
Total kayu 5/7
4
Batang
8
Lembar
8
Batang
Jadi ;
2
Kolom Konvensional 2
1. Papan 2/20 Panjang = = (40X4) = 160 cm Volume = 160 20
= 8 πΏπππππ ο·
Keterangan:
-Tinggi Kolom =3m -Kelebihan setiap papan =1X8 =8m = 2 lembar
2.
Kayu
Vertikal
Ukuran 5/7 Panjang 4 m(1 btg) P = 2 x 4 sisi =8
Kelebihan =1mx8 =8m
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
= 8 btg β 2 btg = 6 btg
3. Tie Rod
8
Batang
4. Wing Nut & Plat
16
Buah
4
Batang
2
Batang
2
Lembar
8
Buah
8
Buah
2
Buah
16
Buah
5.
Sabuk
Kolom
Kayu 5/7 - Panjang = 76 cm P = (76 x 4) x 4 sisi = 1216 cm -Volume =
1216 400
= 3,54 β 4
6. Skor - Kayu 5/7 - Papan 2/20
3
Kolom Sistem ( Steel Wale ) Untuk 2 buah kolom sistem steel wale
1. Steel Wale =4x2 =8 2. Tie Rod =4x2 =8 3. RSS =1x2 =2 4. Hokstrap =8x2 = 16
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
5. Cotter Plate =8x2 = 16 6. Cotter Pin =4x2 =8 7. Wedge K =2x2 =4
16
Buah
8
Buah
4
Buah
2
Lembar
10
Buah
6
Buah
4
Buah
2
Buah
16
Buah
8. Multiplek ukuran (60 x 60 ) 4 SISI x 60 = 240 Volume 240 = 122 = 1,97 β 2 9. Girder 270 =6+4 = 10 10. Girder 360 =4+2 =6 11. Wedge Head Piece =2x2 =4 12. Kickers =1x2 =2 13. Wingnut =8x2 = 16
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
4
Kolom Sistem ( Plat Baja)
1.Gerder 360 (Untuk 1 sisi) =2
2
Buah
2.Gerder 270 (Untuk 3 sisi) =6
6
Buah
3.Plat baja =8
8
Buah
4.Wedge kz =4
4
Buah
2
Lembar
16
Buah
4
Buah
4
Buah
16
Buah
5.Multiplek a. 2 sisi = 62 x 2 = 124 b. 2 sisi = 60 x 2 =120 = 124 + 120 = 244 : 2 =2
5
Kolom Sistem ( Lico )
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
1.Cotter Pin Untuk 1 RSS = 4 Untuk 4 RSS =4x4 = 16 2. RSS =4 3. Krushale =4 4.Pin Untuk 1 RSS = 4 Untuk 4 RSS =4x4 = 16
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
OPNAME BALOK
NO 1
ITEM PEKERJAAN
ANALISA
VOLUME
SATUAN
5
Lembar
Balok Konvensional Untuk 2 balok konvensional
1. Papan 2/20 Panjang = = (193 x 5) = 965 cm = 9,65 m Untuk 2 balok : = 9,65 x 2 = 19,3 m Volume = 19,3 4
= 4,83 β 5
2. Kayu 5/7 -Tiang Penyangga Panjang = = 245 x 3 =735 cm = 7,35 m Untuk 2 balok : = 7,35 x 2 = 14,7 m Volume = =(
14,7 4
)
= 3,675
-Alas balok Panjang = = 100 x 3 = 300 cm = 3 m
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
Untuk 2 balok : =3x2 =6m Volume = 6
=(4) = 1,5
-Skor Perancah Panjang = = 75 x 6 = 450 cm = 4,5 m Untuk 2 balok : = 4,5 x 2 =9m Volume = 9
=(4) = 2,25
Total Kayu 5/7 = 3,675 +1,5+2,25 = 7,425 β 8
8
3. Skor Balok Panjang = = 35 x 6 = 210 cm = 2,1 m Untuk 2 balok : = 2,1 x 2 = 4,2 m Volume = =( KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
4,2 4
)
KHAIRINNISA ZAKWANI
1701022009
Batang
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
= 1,05 -Skor Tiang Penyangga Lurus, Panjang = = 128 x 2 = 256 cm = 2,56 m Miring, Panjang = 180
= ( 436 ππ/4,36 π ) Untuk 2 balok : = 4,36 x 2 = 8,72 m Volume = =(
8,72 4
)
=2,18
Total Kayu utk Skor = 1,05 + 2,18
4
= 3,23 β 4
4. Kayu ΒΎ -Lurus melintang di bagian luar cetakan balok, atas dan bawah Panjang = = 193 x 4 = 772 cm = 7,72 m Untuk 2 balok : = 7,72 x 2 = 15,4 m KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Batang
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
Volume = =(
15,4 4
)
= 3,85
-Vertikal untuk bantalan skor balok Panjang luar = = 32 x 5 = 160 cm Panjang dalam = = 22 x 5 = 110 cm Total Panjang = 160 + 110 = 270 cm = 2,7 m Untuk 2 balok : = 2,7 x 2 = 5,4 m Volume = =(
5,4 4
)
= 1,35
-Skor alas papan cetakan Panjang = = 30 x 4 = 120 cm = 1,2 m Untuk 2 balok : = 1,2 x 2 = 2,4 m KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
Volume = =(
2,4 4
)
= 0,6
Total kayu ΒΎ = 3,85+1,35+0,6 = 5,8 β 6 2
Balok Sistem ( Scafolding)
6
Batang
1
Lembar
1. Multiplek Tebal = 1,8 cm Panjang = 302 cm Lebar = 30 cm
-Luas Multiplek = 244 x 122 = 29768 cm2 -Luas
yang
dibutuhkan = 3 x (302 x 30) = 3 x 9060 = 27180 cm2 -Multiplek yang dibutuhkan 27180
= 29768 = 0,913 β 1 2. Kayu 4/6 Panjang = 30 cm Lebar = 4 cm Tinggi = 6 cm Banyak = 10 buah -30 x 10 = 300 cm KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
-Panjang Kayu = 400 cm = 4 m -Banyak Kayu 300
= 400 = 0,75β 1
1
Batang
2
Buah
5
Buah
4
Buah
10
Buah
2
Buah
4
Buah
4
Buah
2
Buah
3. Girder -Girder 270 -Girder 240
4. Besi Penyangga 5. Skor Siku Besi Hitam 6. Main Frame 7. Base Jack 8. Head Jack 9. Cross Brace
3
Balok Sistem ( Roset ) Untuk 2 balok roset
a.Alas Cetakan (1) -Multiplek 1,8 cm -Panjang = 326 cm -Lebar = 30 cm -Volume = 326 x 30 = 9780 b. Dinding Cetakan (1) -Panjang = 326 cm -Lebar bag. dalam = 30 cm -Lebar bag. Luar = 40 cm
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
-Volume cetakan Dalam = 326 x 30 = 9780 -Volume Cetakan Luar = 326 x 40 = 13040
Total Multiplek 1,8 cm = 9780+9780+13040 = 32600 cm
1 lbr multiplek = 122 x 244 = 29768 cm2
Volume Kebutuhan 32600
= 29768 = 1,1 a.Alas Cetakan (2) -Multiplek 1,8 cm -Panjang = 306 cm -Lebar = 30 cm -Volume = 306 x 30 = 9180 b. Dinding Cetakan (2) -Panjang = 306 cm
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
-Lebar bag. dalam = 30 cm -Lebar bag. Luar = 40 cm
-Volume cetakan Dalam = 306 x 30 = 9180 -Volume Cetakan Luar = 306 x 40 = 12240
Total Multiplek 1,8 cm = 9180+9180+13040 = 30600 cm
1 lbr multiplek = 122 x 244 = 29768 cm2
Volume Kebutuhan 30600
= 29768 = 1,03 Total Multiplek = 1,1 + 1,03 = 2,13 β 3
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
3
KHAIRINNISA ZAKWANI
1701022009
Lembar
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
c. Girder -Girder 120 = 10 x 2 = 20
20
Buah
4
Buah
10
Buah
10
Buah
8
Buah
2
Batang
6
Buah
56
Buah
-Girder 270 =2x2=4
d. Skor -Skor Siku Dalam Hitam =5x2 = 10 -Skor Siku Luar Merah =5x2 = 10
e. Besi Siku =4x2 =8
f. Balok 5/7 = 10 x 2 = 20 =20 x 40 =800 cm2 -Volume 800
= 400 = 2 g. Base Jok h. HNO = 28 x 2 = 56
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
i. Tie Rod Kecil =5x2 = 10
4
Balok Sistem ( Steel Proof) Untuk 2 balok steel proof
Buah
1,5
Lembar
6
Batang
1.Multriplek a.Alas P= 180 cm L= 30 cm Volume= p x l = 180 x 30 = 5400 x 2 = 10800 b. Dinding cetakan ο· p=180 L= 40 Volume= p x l = 180 x 40 = 7200 x 2 = 14400 ο· P= 180 L= 30 Volume= 180 x 30 = 5400 x 2 = 10800 Total multriplek = 10800 + 14400 + 10800 = 36000 -Kebutuhan Multiplek 36000 = 29768 = 1,2 β 1,5 2. Kayu ukuran 5/7 P= 180 x 2 x 2 = 720 P= 140 x 5 x 2 = 1400 Total kayu = 720+1400 = 2.120/400 = 5,3 β 6
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
10
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
3. Kayu Ukuran 5/10 P = 38 x 5 x 2 = 380 P = 28 x 5 x 2 = 280 Total kayu = 380 +280 = 660/400 = 1,65 β 2 4. Siku Besi Besar (40) 5 x 2 = 10 5. Siku Besi Kecil 5 x 2 = 10 6. Besi Siku 4x2=8 7. Steel prop 6 x 2 = 12
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
2
Batang
10
Buah
10
Buah
8
Buah
12
Buah
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
OPNAME PLAT LANTAI
NO 1
ITEM PEKERJAAN
ANALISA
VOLUME
SATUAN
3
Lembar
Plat Lantai Konvensional 1. Multiplek 1,8 cm Panjang = = ( 244 x 305 ) = 74420 cm Volume = 74420 29768
= 2,5 β 3
2. Kayu 4/6 - Memanjang Panjang = = 238 x 3 =714 cm Volume = =
714 400
= 1,785 - Melintang Panjang = = 241 x 5 = 1205 Volume = =
1205 400
= 3,0125 - Tiang Pancang Panjang = = 269 x 12 = 3228
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
Volume = =
3228 400
= 8,07
Total Kayu 4/6 =1,785 + 3,0125 + 8,07 = 12,86 β 13
13
Batang
3
Batang
2. Kayu 5/7 Panjang = = 191 x 6 = 1146 cm Volume = =
1146 400
= 2,86 β 3
2
Plat Lantai Sistem ( Steel Proof)
1. Steel Proof
9
Buah
2. Kayu 5/10 - Panjang = 330 x 30 = 990 cm -Volume = =
990 400
= 2,475 β 3
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
3
KHAIRINNISA ZAKWANI
1701022009
Batang
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
3. Kayu 4/6 - Panjang = = 210 x 7 = 1470 cm -Volume = =
1470 400
4
= 3,675 β 4
Batang
4. Multiplek 1,8 cm - Luas = 330 x 210 = 69300 cm2 - Luas Multiplek = 244 x 122 = 29768 cm2 -Volume =
69300 29768
= 2,328 β 3
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
3
KHAIRINNISA ZAKWANI
1701022009
Lembar
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
OPNAME TANGGA
NO 1
ITEM PEKERJAAN
ANALISA
VOLUME
Tangga Siku Pakai Bordes 1. Papan 2/20 - Bordes Dinding ( 2 sisi ) = (110 x 2) = 220 cm = 2,2 m Alas ( 1 x 1 m) 100 2
=5 =5x1m=5m
- Tangga Atas Alas Tangga Atas 100 2
=5 = 5 x 2,74 m = 13,7 m
Dinding = 2 x 2,8 m = 5,6 m ( 1 sisi ) = 2 x 5,6 m = 11,2 m ( 2 sisi ) Anak Tangga = 13 x 100 = 1300 cm = 13 m
Total Papan 2/20 =2,2+5+9,2+7,6+ 13,7+11,2+13 m = 61,9 m
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
SATUAN
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
61,9 4
= 15,47 β 16
16
Lembar
12
Batang
2. Kayu 5/7 - Tiang Perancah = (2,86 x 2) + (2,4 x 2) + (1,94 x 2) + (1,8 x 2) + (1,4 x 2) + (1 x 2) =5,72+4,8+3,88+ 3,6+2,8+2 = 22,8 m - Skor Bordes = (120x2)+(110x2) = 460 cm = 4,6 m - Skor Alas Papan =45+70+95+120+ 151+191+251 = 923 cm = 9,23 m -Penahan Papan (melintang) = 0,90 x 9 = 8,1 m
Total Kayu 5/7 =22,8+4,6+9,23+ 8,1 = 44,73 m =
44,73 4
= 11,18 β 12
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
2. Kayu 4/6 = 260 x 4 = 1040 cm = 10,4 m
Total Kayu 4/6 =
10,4 4
= 2,6 β 3
2
Tangga ΒΌ Lingkaran
3
Batang
4
Lembar
1. Papan 2/20 a. Papan Optride - Panjang Total =111+109+109+ 111+127+124+103 +99+99+100+100 =1301 cm b. Papan Skor Pengaku 1 skor = 6 cm 12 pasang skor = 12 x 2 = 24 skor = 24 x 6 = 144 cm - Jumlah Papan Optride + Papan Skor Pengaku = 1301 + 144 = 1445 cm - Volume 1445 400
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
= 3,61 β 4
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
2. Kayu 5/7 - Total Panjang Kayu Melintang =102+101+92+100 +101+109+139+ 112+92+88+88 = 1124 cm - Total Panjang Skor Tengah =233+213+189+ 172+159+127+110 +87,5+67+49+28 = 1434,5 cm - Jumlah = 1124+1434,5 = 2558,5 - Volume =
2558,5 400
= 6,59 β 7
X. Kayu 5/7 terdiri dari 2 yaitu : - Bagian Kanan Total Panjang =35,5+37,5+38+43 +57+42+26+47+42 +38,5+36,5+25 = 468 cm - Bagian Kiri =38,5+27,5+30+28 +27+24,5+22+25+ 28+39+36,5+24
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
=349,5 cm - Volume = =
468+349,5 400 817,5 400
= 2,044 β 3
3
Batang
1
Batang
X. Kayu 5/7 untuk Skor Tengah Total Panjang = = 34+31+20+30+ 45,5+33+29,5+ 39,5+ 29+31 = 334,5 cm - Volume =
334,5 400
= 0,836 β 1
2. Multiplek P = 244 cm L = 122 cm Luas Multiplek = = 244 x 122 = 29768 cm2
- Panjang yang dibutuhkan P = 244 cm L = 100 cm Luas = = 2 x (244 x 100) = 48800 cm2
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Workshop Kerja Acuan Dan Perancah
Jurusan Teknik Sipil
LAPORAN PRAKTIKUM
Politeknik Negeri Padang
- Volume 48800
= 29768 = 1,639 β 2 2
KELOMPOK BETA 2.A β D3 TEKNIK SIPIL T.A 2018/2019
KHAIRINNISA ZAKWANI
1701022009
Lembar