October 2 2003

  • Uploaded by: Harry Harshaw
  • 0
  • 0
  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View October 2 2003 as PDF for free.

More details

  • Words: 174
  • Pages: 1
Hope Center

Tuesday October 2, 2003

Thomas Watkins Harry Harshaw

Meeting Place: Hope Center Wood stock Georgia Meeting time: 3:00pm to 7:00pm Hours of meeting: 4 hours Goal: 1. 2. 3. 4. 5.

Meeting with entire Hope Center staff Issue user guides Present overview of network Answer individual questions Provide customer with Network Documentation.

Notes: Today was the last day technically for the project and all was completed we presented the customer with all technical documentation of the network. And provided answers to all questions. We received very positive feedback form the Hope Center personnel. The customer was very happy with the user manuals provided to them because they where a step by step walk through of configuring the most important devices on the network. There was a few minor things that the customer requested such as a password change. This was done very simply. The network documentation is set up so that any one either an IT professional or a everyday user can configure and trouble shoot it. Setbacks: No setbacks are apparent

Related Documents

October 2 2003
October 2019 24
October 2
June 2020 1

More Documents from ""

Hope3
October 2019 43
Server
October 2019 48
August 30 2003
October 2019 43
Hope7
October 2019 50
Project Hope Plan
October 2019 37
Hope6
October 2019 38