Minutes 4

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Minutes 4 as PDF for free.

More details

  • Words: 244
  • Pages: 1
Minutes of Meeting Group “WTFLOL” Held on Thursday 29th March 2007 at the Leaf Lab Mech Eng Undercroft Starting at 1510 Reasons for meeting: 1. To work on the ‘Robo Sumo’ project. Present: All members. Apologies: None. Absent: None. Agendas/ Issues: Other - Issued deadline for ‘Robo Sumo’ Thursday week. - Discuss in terms of physics strategy of ‘lifting’ opponent. - Preliminary plan to finish construction of robot by the weekend. - Programming still ‘under construction’. Building - Designing the final outcome of the Sumo Robot for next week’s competition. – Mike, Daniel, Alan - Commencement of building prototype Lego robot for ‘Robo Sumo’ - Assembly of wheels. Complete. Starting the construction of the body. - Location and function of light sensors on robot. - Proposal of “spring back” top in case it flips. - “Caged” the wheel to prevent case of entanglement with opponent in the ring. - Strategising ‘attacks’ and ‘defence’ tactics that could be deployed in relation to the design and construction of the robot.ie attacks from the side etc. Programming - Reprogramming to debugging the program to suit and manage the essential tasks necessary for the robot – Charles - Bug in the NQC ‘tasks’. - Bug fixed - New bug found. - Testing program on brick. - Motors failed at test attempt 3 - Motors operational but at slow speed. Date Of Next Meeting: Saturday 31st April 2007 at 1200 outside on the CSE lawn. Meeting Closed at …1604

Related Documents

Minutes 4
November 2019 16
Minutes 4
November 2019 20
Minutes 4-28-09
April 2020 4
Meeting Minutes 4
June 2020 7