STI KORONADAL CITY PROJMAN / PROMGMT PROJECT MANAGEMENT AND QUALITY SYSTEMS JOHN CEDRICK S. ALER, MIT
PROJECT Title
1-1
PROJMAN Project Management PROJMAN Project Management Professor: John Cedrick S. Aler, MIT
MIDTERM PROJECT Objective The midterm project aims to effectively apply the knowledge and skills in project management through the development of an IT solution and providing documentations to a business problem
Specifications for the First Set of Deliverables SECTION I 1. Introduction 1.1 Company Background 1.2 Statement of the Problem 1.3 Project Objectives 1.4 Project Scope Answers to the following questions could help determine the project scope:
Which organizational units (business functions and divisions) are affected by the proposed system?
Who will be using the proposed system?
What external application systems will it be interacting with? Which of those external systems need to be changed or revised as a result of implementing the new system?
Who inside and outside the requesting department/branch/section (or the organization as a whole) would care about the proposed system?
Title
What range of potential system capabilities are to be considered?
1-2
PROJMAN Project Management 1.5 Project Constraints
Aside from budget, specify other factors that could hinder, impact, or severely limit the implementation of this project
2. Feasibility Assessment – Evaluate project based on economic, technical, operational, and political feasibility. 3. Management Issues 3.1 Team Configuration Management
Provide a list of team members and a description of the team member roles and reporting relationships.
3.2 Communication Plan
Describe the communication procedures to be followed by management, team members, and the customer.
Explain how the user will be kept informed about the project progress (ie. Periodic review meetings) and which mechanisms will be used to facilitate sharing of ideas and information (ie.telephone conferencing, e-groups, Internet messaging software).
3.3 Project Standards and Procedures
Describe how artifacts/deliverables will be evaluated and accepted by the customer (eg. via formal sign-off document to finalize scope of requirements).
SECTION II Statement of Work (SOW) (Please see template) SECTION III 1. Description of the Current System
Give a half- or one-page narrative of current business processes and practices. Expound on manual or computerized components and the data they handle.
Title
Enumerate problems encountered with the existing system. 1-3
PROJMAN Project Management 2. Proposed Features of the New System 2.1 Functional and Non-Functional Requirements (Provide a high level view of the proposed system with the use of Use Case Diagrams, System Sequence Diagrams and Problem Domain Class Diagrams) 2.2 Envisioned Implementation Environment
Furistic Vision or detailed information of your project after the implementation process.
2.3 Interfaces with other Systems
Specify high-level information going to and coming from other external systems