METHODE OF IMPLEMENTATION OF DEWATERING CLOSING WORK

1. PREPARATION A. PROTECTION OF WELL AREA • Protecting the well area for dewatering work does not interfere with other work. • Provide marks and safety tapes for warnings of nearby workers. B. MATERIAL WORK • SIKA GROUT 215 C. ALAT KERJA • Hammer • Chisel • Injection Machine • Mixer Machine • Bucket • Cement spoon • Machine cutter 2. WORK IMPLEMENTATION A. Implementation of Dewatering Closure Works    

Make concrete balls ± 5 pieces with diameter size adjusted with pipe dewatering. Put all the concrete balls into the dewatering hole. Every 1 meter in the content of coral material. If the coral has reached the working floor (-25cm), it will be implemented closure using



grouting material sika grout 215. Grouting can be done 2 stages, if the source of water from ex well big enough.

Related Documents


More Documents from "mufialdo"

Log Book Kep Ger.docx
December 2019 62
Bab 1.docx
December 2019 43
Dasar Teori Reproduksi
August 2019 50
Agamakul.doc
November 2019 16