A. Pekerjaan Persiapan No

Uraian Pekerjaan

Vol

Sat.

I

PEKERJAAN PERSIAPAN :

1

Pembersihan lapangan

1

ls

2

Pengukuran dan bouwplank

1

ls

3

Penyediaan listrik & air kerja

1

ls

4

Papan nama proyek

1

ls

5

Administrasi proyek

1

ls

11286800 13680

1128.68 136.8

B. Pekerjaan Struktur dan Atap No

Uraian Pekerjaan

a.

PEK. TANAH :

1

Galian Tanah

2

Urugan kembali

b.

PEK. BETON BERTULANG 1:2:3 :

I

PEKERJAAN STRUKTUR LANTAI 1 :

1

Vol

Sat.

1236.52

m3

412.17

m3

Sirtu

207.76

m3

2

Lantai kerja 1:3:5 bwh poor/sloof t = 5 cm

30,802

m

3

Beton balok RIB

33.78

m3

4

Beton balok sloof

39,484

m3

5

Beton plat pondasi

109,285

m3

6

Beton kolom struktur

39,120

m3

7

Beton balok induk

64,250

m3

8

Beton balok anak

19,464

m3

9

Beton plat lantai

81,518

m3

10

Beton plat daak canopy

9,554

m3

11

Beton listplank

16,852

m3

12

Tangga beton

4,812

m3

13

Water proofing daak canopy

39.72

m2

II

PEK.BETON BERTULANG LANTAI 2 :

1

Beton kolom struktur

23,740

m3

2

Beton balok ring atas

22,481

m

3

Beton plat daak

2,172

m3

4

Water proofing daak

39.72

m2

III

PEK. RANGKA ATAP DAN ATAP :

1

Kuda kuda baja ringan ( lengkap )

1,088,623

m2

2

Atap genteng keramik glasur

1,088,623

m2

3

Bubungan genteng keramik glasur

117,464

m

4

Ornamen puncak atap

6

bh

5

Corong talang ø 3" PVC

204

m'

6

Listplank ky bengkirai 2X2/20

204

m'

7

Flashing atap

84,624

m'

C. Pekerjaan Finishing Arsitektur

3

3

1409.435 469.812

105.56 28.71 bekisting 34.08 35.26 352.72 48.29 401.42 36.69 437.25 64.13 524.53 19.46 210.19 82 407.75 2.05 56.75 0.51 5.28 7.96 77.86 11.98 11.15 9.7 3.97 39.72 1186.88 1,089 2.41 6 68 266.8 266.8

437.25 125.35 39.72

No

Uraian Pekerjaan

Vol

Sat.

a.

PEK. FINISHING ARSITEKTUR LT. 1 :

I

PEK. PONDASI BATU BELAH :

1

Pondasi batu belah 1:6

393,442

m3

2

Aanstamping

141,625

m3

3

Urug pasir bwh pondasi + urug pasir bwh rolag

135,689

m3

4

Urugan tanah peninggian bangunan t = 60 cm

521.52

m3

II

PEK. PAS. BT. BATA / PLESTERAN :

1

Pas. rollag 1:3

67.44

m2

2

Pas. bt. bata 1:3

937.78

m

3

Pas. bt. bata 1:6

1334.02

m2

4

Plesteran 1:3

1875.56

m2

5

Plesteran 1:6

2668.04

m2

6

Plesteran beton

466.4

m2

7

Beton praktis sloof

237.7

m'

8

Beton praktis kolom

408

m'

9

Beton praktis balok latei

186.22

m'

III

PEK. PAS. KOSEN :

1

Kosen aluminium 4"

811.9

m'

2

Kaca bening 5 mm

66.75

m2

3

Kaca raam jendela 5 mm

3.24

m2

4

Kunci tanam

59

bh

5

Floor hinges

12

unit

6

Kunci raam alluminium

6

unit

7

Engsel pintu

8

Daun pintu double teakwood

9

Pintu PVC lengkap kunci,engsel,kusen

10

Pintu raam alluminium

11

Sun screen hollow finish cat

12

Raam jendela alluminium

13

2

175.596 94.99 17.59 764.904 6.3 556.2 223997.6 1112.4 447995.2 99.6 21.174 816 274.6

1334.02 2668.04

928.6 74.192 10.01 194 4 2 156 89.4 162 2 177.4 920 86 109 344 2 225.63 41

59

186

bh

27.84

m2

27

unit

6

unit

69.16

m2

525.68

m'

Engsel jendela

218

bh

14

Grendel

109

bh

15

Raam skor

109

bh

16

Pintu shaft besi 40/60 ( lengkap )

53

bh

17

Railing tangga pipa hitam finish cat Lt. 1 ke Lt. 2

76,184

m'

18

Railing depan tralis besi finish cat lt. canopy

4.46

m'

IV

PEK. PLAFOND :

1

Plafond exspose aci

0

m

2

2

Plafond asbes plat

639.64

m

2

3

List tepi kayu profil

788.33

m'

V

PEK. PASANG LANTAI DAN DINDING :

1

Urug pasir bawah lantai

74,862

m3

2

Lantai rabat beton tritisan

18.09

m3

195.84

17.83

3

Lantai keramik 20x20 cm lavatory

106.24

m2

78.39

78.39

27.84 27

109

bag 3 135.65 614.24 1027.05 kel 2

730.48 909

mahawirya 79.68 82.2

4

Dinding keramik 20x25 cm Lavatory

182,115

m2

5

Lt. keramik warna 40/40 cm

519.5

m2

6

Lantai keramik warna u.tangga 40/40 cm

15.67

m2

7

Plint lantai jeglok finish cat minyak

481.09

m'

8

Batu tempel dinding canopy

39.2

m2

9

Nosing tangga

35.2

m'

VI

PEK. PENERANGAN :

1

Lampu SL 18 W

106

bh

2

Down light SL 18 W

67

bh

3

Lampu baret 40 W

2

bh

4

Ceiling fan

27

bh

5

Stop kontak 200 W

56

bh

6

Saklar tunggal

30

bh

7

Saklar ganda

53

bh

VIII

PEK.SANITAIR :

1

Closet jongkok warna tua

27

bh

2

Saringan air ( floor drain )

53

bh

3

Kran air

53

bh

4

Meja pantry + wash bak

2

bh

5

Bak mandi Fiber + keramik 20/25

27

bh

6

Kaca cermin 40x60 tepi dibevel

27

bh

IX

PEK. CAT-CATAN :

1

Cat tembok

3786.91

m2

2

Cat plafond

3

Pelituran Daun Pintu

b.

PEK.FINISHING ARSITEKTUR LT.2 :

I

PEK. PAS.BT.BATA/PLESTERAN,BETON PRAKTIS :

1

771

m

178.08

m2

Pas. bt. bata 1:3

237.9

m2

2

Pas. bt. bata 1:6

1511.53

m2

3

Plesteran 1:3

461,175

m2

4

Plesteran 1:6

3023.06

m2

5

Plesteran beton

283.2

m2

6

Beton praktis kolom

352

m'

7

Beton praktis balok latei

143.4

m'

II

PEK. PAS. KOSEN :

1

Kosen aluminium 4"

724.2

m'

2

Raam jendela alluminium

486.88

m'

3

Kaca bening 5 mm

619,478

m2

4

Kaca boven 5 mm

3.9

m2

5

Kunci tanam

52

bh

6

Engsel pintu

156

bh

7

Daun pintu double teakwood

87.36

m2

8

Pintu PVC lengkap kunci,engsel,kusen

26

unit

9

Sun screen hollow finish cat

69.16

m2

2

649600 679.2 286812.34 558.7 21.89 34.38

188.96 679.26 29.8 558.7 21.89 34.38

106 67 2 27 56 28 53 mahawirya Galuh 27 27 54 0 27 27 5652.45 831.08 24.56

208.68 1348.71 417.36 2697.42 225.6 344 259.3 710 517.2 101.882 3.9 52 104 87.36 26 25.48

27 53 53 4 27 27

8397.09 588.758 178.08

10

Engsel jendela

192

bh

11

Grendel

96

bh

12

Raam skor

96

bh

III

PEK. PLAFOND :

1

Plafond asbes plat

876,742

m2

2

List tepi kayu profil

930.8

m'

IV

PEK. PASANG LANTAI DAN DINDING :

1

LT keramik 20x20 cm lavatory

125.97

m2

2

Dinding keramik 20x25 cm lavatory

227,825

m

3

Lt. keramik 40/40 cm

979.8

m2

4

Plint lantai jeglok finish cat minyak

474

m'

5

Water proofing R lavatory

177.58

m2

V

PEK. PENERANGAN :

1

Lampu SL 18 W

104

bh

2

Down light SL 18 W

54

bh

3

Lampu Baret 40 w

4

Ceiling fan

26

bh

5

Stop kontak 200 W

54

bh

6

Saklar tunggal

24

bh

7

Saklar ganda

52

bh

VI

PEK.SANITAIR :

1

Closet jongkok warna tua

26

bh

2

Saringan air ( floor drain )

52

bh

3

Kran air

52

bh

5

Kaca cermin 40x60 tepi dibevel

26

bh

6

Bak mandi Fiber

26

bh

IX

PEK. CAT-CATAN :

1

Cat tembok

3029.16

m2

2

Cat plafond

876,742

m2

3

Pelituran Daun Pintu

174.72

m2

4

Cat listplank kayu

61.56

m2

2

384 96 18 bag 5 665.57 866.95 58.44 249.6 511.86 315 249.6 106 67 27 56 30 53 26 26 52 26 26 2987.4 706.38 87.36 67.68

D. Pekerjaan Halaman dan Bangunan Penunjang No

Uraian Pekerjaan

a.

PEK. SALURAN

1

Saluran terbuka U 20

2

Saluran buis beton ø 20

3

Bak kontrol 45x45

b.

SEPTICTANK + PERESAPAN (8 UNIT)

1

Galian tanah

2

Urugan tanah kembali

3

Pasir urug

4

Aanstamping

5

Beton bertulang (plat dasar,tutup)

6 7

Vol

Sat.

207

m'

40.74

m'

35

bh

110.58

m3

36.86

m3

6.34

m3

22.04

m3

7.83

m3

Dinding bata 1:3

131.76

m2

Plesteran 1:3

146.40

m2

171.45 2.073 33 36.682 10.14 2.208 15.064 12.64 117.395 234.79

104 54 0 26 54 24 52

8

Pipa hawa ø 1½" GIP

8

bh

9

Pipa PVC dia.4"

8

bt

10

Ijuk

14.47

m2

11

Kerikil+batu pecah

9.52

m3

12

Sirtu

4.8

m3

8 13 1.295 0.365 4.8

13750 15519350 135588.2 18548465.76

Beton tul ulir

tul polos 3292.78 2080.55 5182.58 2685.04 6805.6 5001.3 2348.77 3871.75 3294.59 1591 781.45 17610.55 55.7 3.01 365.1 1332.68

Bekisting

1,077,191.70 1,077,191.70

181,016.00

170,016.00 1,077,191.70 369,264.50 1,077,191.70 385,932.80 1,077,191.70 1,077,191.70 385,932.80 461,664.50 1,077,191.70 411,664.50 1,077,191.70 1,077,191.70 300,932.80 346,769.50 1,077,191.70

Tul ulir

Tul . Polos

13,037.20 13,037.20 13,037.20 13,037.20 13,037.20 13,037.20 13,037.20 13,037.20 13,037.20 13,037.20 13,037.20

13,037.20 13,037.20 13,037.20 13,037.20 13,037.20 13,037.20 13,037.20 13,037.20 13,037.20 13,037.20 13,037.20

13,037.20 13,037.20 13,037.20

13,037.20

25,910.50

2910.15 778.5 421.92

1,077,191.70

369,264.50

90,863.00 1,077,191.70 411,664.50 25,910.50 103,900.50

13,037.20

bag 5 104.48 17.84

660.625

20.39

Kelvin

3510 Kelvin 2047.948 706.38 90.72

27 27 53 4 27 27

HARGA

TOTAL HARGA

84,269,144 3,248,441,643.04 3057103518.61535 95486358.20475 6,485,300,664 648530066.38586 7,133,830,730 93,995.00 15583.333333

257,812.50 896,917.59

5796978.9656

132,479,842.83 7,321,237.00

27214687.5 25750504.0089 106763871.012 204401478.326 208991378.233 296807398.702 364942643.153 133011470.854 505646475.3356 26296375.4 2177534.923 57708216.618 310407.79 211411797.66 22546972.1 26128420.413 1029165.06

568,480.00 138935 112618 35475 58384.33 149380 64570.5

674717542.4 151247836.505 271409.38 212850 3970134.44 39854584 17227409.4 3,248,441,643.04

892,171.50 533,346.00 237,050.00

15583.333333 235,028.75 113,177.35 109,308.10 60,840.78 58,345.98 60,840.78 200,414.50 176,203.51 286,262.58

110,542.30 127,710.00 134,420.00 175,835.00 1,374,835.00 178,035.00 26,152.50 755,287.50 225,940.00 110,542.30 458,320.00 109,230.55 17,435.00 33,880.00 26,422.00 810,590.00 492,726.30 36,107.50

33,013.75 28,997.00 15,994.00

237,050.00 957,528.00 205,584.50

156661746.714 50662536.54 4169709.5 11919754 1480681.125 62949242.07 145819191.562 67679283.672 155669408.4792 6059741.688 4243576.623 143782064.16 78607704.468 102649579.78 9475060.32 1345544.2 34111990 5499340 356070 4079790 67522702.5 36602280 221084.6 81305968 100492106 1499410 3692920 9089168 1621180 111173835.069 1480407.5 4478315.1875 17811117.28 14538546 18888144 17072724.24 16115768.955

232,754.50 210,619.51 210,619.51 12,828.20 261,208.75 87,208.00

54252 156552 1273052 259100 46420 43120 46970

602,745.00 40,535.00 75,524.63 341,605.00 1,161,600.00 351,560.00

19,423.80 19,423.80 54,562.20

113,177.35 109,308.10 60,840.78 58,345.98 60,840.78 176,203.51 286,262.58

110,542.30

109230.55 127710 134420 175835 26152.5 755287.5 225940 458320

43981290.32 139140513.79375 6276461.398 7167115.34 5326046.4125 2998211.04 5750712 10488984 2546104 6995700 2599520 1207360 2489410

16274115 1094445 4002805.39 1366420 31363200 9492120 39778932.3624 13720583.844 4949882.784

23617849.398 147424927.551 25392507.9408 157383613.3716 13725679.968 60614007.44 74227886.994 78485033 56494040.46 13011350.22 524238 9143420 2719860 65981916 5874440 11677993.6

17435 33880 26422

6695040 3252480 475596

28,997.00

19299533.29 13865998.3

15,994.00

205584.5 232754.5 210619.51 12828.2 26,180.00

12014358.18 58095523.2 107807702.3886 4040883 6534528

46970

5750712 10488984 0 6995700 2599520 1293600 2489410

602745 40535 75524.63 351560 1161600

15671370 1053910 3927280.76 9140560 30201600

19,423.80

58026660.12 13720583.844 4766553.792 2759042.88 3057103518.61535

54252 156552 1273052 259100 46420 43120

19,423.80 54,562.20 40,766.00

628,781.47

18659280.69 215399.4183 20749788.51

93,995.00 15,583.33 237,050.00 533,346.00 1,077,191.70 113177.35 60840.78

3447924.59 158015 523406.4 8034324.144 13615703.088 13286455.00325 14284806.7362

108,832.20 103,907.10

22,121.00 61,336.00 60,225.00 606,650.00 257,812.50

176968 797368 77991.375 221427.25 1237500 95486358.20475

A

Pekerjaan Persiapan

Perhitungan

Pembersihan Lapangan L = PxL L= 406 x 278 1128.68 1

Pengukuran Bouwplank K = 2 x (406 + 278) 1368 2

3

Penyediaan Listrik Dan Kerja

4

Papan Nama Proyek

5

Administrasi Proyek

Volume

Satuan

1128.68

m2

1368

m'

1

Ls

1

Ls

1

Ls

B

Pekerjaan Struktur Dan Atap

I

Pekerjaan Tanah

1

Galian Tanah Galian Footplate P1-P2

Perhitungan

Luas Galian = (1.5+2.5)/2 x 2.5 = 5 m2 Volume Galian = 5 x 120,4 = 602 m3

Galian Footplate P3-P4

Luas Galian = (1.75+2.75)/2 x 2.5 = 5.63 m2 Volume Galian = 5.63 x 108.8 = 635.06 m3

Galian Footplate P5, P6 dan P7

Volume Galian P5 dan P6 = (1.5+2.5)/2 x 2.5x 2,5 x 8 = 100 m3 Volume Galian P7 = (1+2)/2 x 2x 2.5 x 8 = 60 m3

Galian Batu Kali Pot. 1

Luas Galian = ((0.6+0.9)/2 x 0.75) = 0.5625m2 Volume Galian = 0.5625 x 6 = 3,375m3

Luas Galian = ((0.6+0.9)/2 x 0.75) = 0.5625m2 Volume Galian = 0.5625 x 6 = 3,375m3

Galian Batu Kali Pot. 2

Galian Batu Kali Pot. 3

Volume Galian = 0.3 x 0.15 x 16 = 0.36 m3

Luas Galian = ((1+2)/2 x 1,5) = 2.25 m2 Volume Galian = 2.25 x 409,2 = 920,7m3

Luas Galian = ((1+1,5)/2 x 1,5) = 1,875 m2

Galian Batu Kali Pot. 4

Volume Galian = 1,875 x 193,4 = 734.85 m3

TOTAL 2

Urugan Kembali Volume Pengurugan Kembali

Volume Urugan Kembali = 1/3 * Volume Total Galian

TOTAL II

Pekerjaan Beton Bertulang

a

Pekerjaan Struktur Lt 1

1

Sirtu Sirtu P1 dan P2 Luas Sirtu P1 dan P2 = ((1.5+1.75)x0.5) / 2 =0.41 m2 Volume = 0.41 x 58.2 x 2 = 47.29 m3

= ((1.5+1.75)x0.5) / 2 =0.41 m2 Volume = 0.41 x 58.2 x 2 = 47.29 m3

Sirtu P3 dan P4 Luas Sirtu P3 dan P4 = ((1.75+2)x0.5) / 2 =0.47 m2 Volume = 0.47 x 54.4 x 2 = 51.14 m3

Sirtu P5, P6 dan P7

Luas Sirtu P5 dan P6 = ((1.5+1.75)x0.5) / 2 =0.41 m2 Volume = 0.41 x 12 = 4.88 m3 Luas Sirtu P7 = ((1+1.25)x0.5) / 2 =0.28 m2 Volume = 0.28 x 8 = 2.25 m3

TOTAL 2

Lantai Kerja 1:3:5 Lantai Kerja P1 dan P2

Volume = 1.5 x 0.07 x 118.1 = 12.4 m3

Volume = 1.75 x 0.07 x 108.8 = 13.33 m3

Lantai Kerja P3 dan P4

Lantai Kerja P5, P6 dan P7

Volume P5 dan P6 = 1.5 x 2.5 x 0.07 x 6 = 1.58 m3 Volume P7 = 1 x 2.5 x 0.07 x 8 = 1.4 m3

TOTAL 3

Beton Balok RIB Balok RIB P1

Volume Balok RIB P1 = 0.25 x 0.6 x 76.8 = 11.52 m3 Tulangan 10D19 = 76.8 x 10 x 192/162 = 1711.41 kg Tulangan Ø12-10 Keliling Sengkang = ((0.6-(0.02x2))x2) + ((0.25(0.02x2))x2) = 1.54 m Jumlah Tulangan = (7680/10) + 1 = 769 Volume = 1.54 x 769 x 122/162 = 1052.68 kg

= 1.54 x 769 x 122/162 = 1052.68 kg

Balok RIB P2

Volume Balok RIB P2 = 0.25 x 0.6 x 41.6 = 6.24 m3 Tulangan 6D19 = 41.6 x 6 x 192/162 = 556.21 kg Tulangan Ø10-15 Keliling Sengkang = ((0.6-(0.02x2))x2) + ((0.25(0.02x2))x2) = 1.54 m Jumlah Tulangan = (4160/15) + 1 = 279 Volume = 1.54 x 279 x 102/162 = 265.22 kg

Balok RIB P3

Volume Balok RIB P3 = 0.25 x 0.6 x 64 = 9.6 m3 Tulangan 10D19 = 64 x 10 x 192/162 = 1426.17 kg Tulangan Ø12-10 Keliling Sengkang = ((0.6-(0.02x2))x2) + ((0.25(0.02x2))x2) = 1.54 m Jumlah Tulangan = (6400/10) + 1 = 641 Volume = 1.54 x 641 x 122/162 = 877.46 kg

Balok RIB P4

Volume Balok RIB P4 = 0.25 x 0.6 x 44.8 = 6.72 m3 Tulangan 6D19 = 44.8 x 6 x 192/162 = 598.99 kg Tulangan Ø10-15 Keliling Sengkang = ((0.6-(0.02x2))x2) + ((0.25(0.02x2))x2) = 1.54 m Jumlah Tulangan = (4480/15) + 1 = 300 Volume

= 44.8 x 6 x 19 /162 = 598.99 kg Tulangan Ø10-15 Keliling Sengkang = ((0.6-(0.02x2))x2) + ((0.25(0.02x2))x2) = 1.54 m Jumlah Tulangan = (4480/15) + 1 = 300 Volume = 1.54 x 300 x 102/162 = 285.19 kg

TOTAL

4

Beton Balok Sloof Type Sloof S1

Luas Sloof S1 = 0.2 x 0.4 = 0.08 Volume Sloof S1 Bang. Sayap S1 = (0.08x3.25x27x2) = 14,04 m3 S1 1 = (0.08x0.825x2) = 0.132 m3 S1 2 = (0.08x1x2) = 0.16 m3 S1 3 = (0.08x1.8x2) = 0.288 m3 S1 4 = (0.08x1.725x2) = 0.275 m3 S1 5 = (0.08x1.625x2) = 0.26 m3 S1 6 = (0.08x1.225x2) = 0.196 m3 S1 7 = (0.08x1.85x2) = 0.296 m3 S1 8 = (0.08x4.15x2) = 0.664 m3 S1 9 = (0.08x1.45x2) = 0.232 m3 Volume Sloof S1 Bang. Utama S1 = (0.08x5.7) = 0.457 m3 S1 1 = (0.08x5.85) = 0.468 m3 S1 2 = (0.08x3.3x4) = 1.056 m3 S1 3 = (0.08x3.9x2) = 0.624 m3 S1 4 = (0.08x2.15x2) = 0.344 m3

Bang. Sayap Volume Tulangan 6D16 = (115.50x6x162/162) x 2 = 2190.22 kg Keliling Sengkang = ((0.4-0.02)+(0,2-0,02)x2) = 1,12 m Lapangan Ø10-15 = (1/2x115.50) = 57.75 m Jumlah sengkang = 385 + 1 = 386 Tumpuan Ø10-10 = (1/4x115.50) = 28.875 m Jumlah sengkang = 288.75 + 1 = 290 x 2 = 580

Keliling Sengkang = ((0.4-0.02)+(0,2-0,02)x2) = 1,12 m Lapangan Ø10-15 = (1/2x115.50) = 57.75 m Jumlah sengkang = 385 + 1 = 386 Tumpuan Ø10-10 = (1/4x115.50) = 28.875 m Jumlah sengkang = 288.75 + 1 = 290 x 2 = 580 Volume Ø10-10, Ø10-15 = 1.12 x 966 x 102/162 = 667.85 x 2 = 1335.70 kg

Bang. Utama Volume Tulangan 6D16 = (39.8x6x162/162) = 377.36 kg Keliling Sengkang = ((0.4-0.02)+(0,2-0,02)x2) = 1,12 m Lapangan Ø10-15 = (1/2x39.8) = 19.9 m Jumlah sengkang = 132.67 + 1 = 134 Tumpuan Ø10-10 = (1/4x39.8) = 9.95 m Jumlah sengkang = 99.5 + 1 = 101 x 2 = 202 Volume Ø10-10, Ø10-15 = 1.12 x 336 x 102/162 = 232.30 kg

Bekisting Volume Bekisting = (103.4x0.4x2x2) + (36.85x0.4x2) = 194.92 m2

Type Sloof S2

Luas Sloof S2 = 0.2 x 0.6 = 0.12 Volume Sloof S2 Bang. Sayap S2 = (0.12x5.65x7x2) = 9.49 m3 S2 1 = (0.12x1.45x3x2) = 1.04 m3 S2 2 = (0.12x7.45x2) = 1.78 m3 S2 3 = (0.12x5.8x2) = 1.40 m3 Volume Sloof S2 Bang. Utama S2 = (0.12x5.7x2) = 1.37 m3 S2 1 = (0.12x1.54x4) = 0.70 m3

Volume Sloof S2 Bang. Utama S2 = (0.12x5.7x2) = 1.37 m3 S2 1 = (0.12x1.54x4) = 0.70 m3

Bang. Sayap Volume Tulangan 12D16 = (59.45x12x162/162) x 2 = 2254.70 kg Keliling Sengkang = ((0.6-0.02)+(0,2-0,02)x2) = 1,56 m Lapangan Ø10-15 = (1/2x59.45) = 29.74 m Jumlah sengkang = 198.17 + 1 = 199 Tumpuan Ø10-10 = (1/4x59.45) = 14.86 m Jumlah sengkang = 148.63 + 1 = 150 x 2 = 300 Volume Ø10-10, Ø10-15 = 1.56 x 499 x 102/162 = 480.52 x 2 = 961.04 kg

Bang. Utama Volume Tulangan 12D16 = (19x12x162/162) x 2 = 360.3 kg Keliling Sengkang = ((0.6-0.02)+(0,2-0,02)x2) = 1,56 m Lapangan Ø10-15 = (1/2x19) = 9.5 m Jumlah sengkang = 63.3 + 1 = 64 Tumpuan Ø10-10 = (1/4x19) = 4.75 m Jumlah sengkang = 47.5 + 1 = 49 x 2 = 98 Volume Ø10-10, Ø10-15 = 1.56 x 162 x 102/162 = 156 kg

Bekisting Volume Bekisting = (57.15x0.6x2x2) + (17.2x0.6x2) = 157.8 m2

TOTAL

TOTAL

5 Beton Plat Pondasi Pondasi P1

Volume P1 = ((0.2+0.35)/2)x0.625) x 2 x 16 x 2 = 11 m3 Jumlah Tulangan Ø12-15 = (200/15) + 1 = 15 Keliling Ø12-15 = 0.2 + 1.5 + 0.2 + 0.65 + 0.65 = 3.4 m Volume Ø12-15 = 3.4 x 15 x 122/162 x 32 = 1450.67 kg Jumlah Tulangan Ø10-15 = (255/15) + 1 = 18 Volume Ø12-15 = 2 x 18 x 102/162 x 32 = 711.11 kg Bekisting = (((0.2x2) + (0.65x2)) x 32) + (8x((0.2+0.35)/2)x62.5)) = 191.9 m2

Pondasi P2

Volume P2 = ((0.2+0.35)/2)x0.625)x1.6x13x2 = 7.15 m3 Jumlah Tulangan Ø12-20 = (160/20) + 1 = 9 Keliling Ø12-20 = 0.2 + 1.5 + 0.2 + 0.65 + 0.65 = 3.4 m Volume Ø12-20 = 3.4 x 9 x 122/162 x 26 = 707.2 kg Jumlah Tulangan Ø10-15 = (255/15) + 1 = 18 Volume Ø12-15 = 1.6 x 18 x 102/162 x 26 = 462.22 kg Bekisting = ((0.2x1.6) + (0.65x1.6)) x 26 = 35.36 m2

Jumlah Tulangan Ø10-15 = (255/15) + 1 = 18 Volume Ø12-15 = 1.6 x 18 x 102/162 x 26 = 462.22 kg Bekisting = ((0.2x1.6) + (0.65x1.6)) x 26 = 35.36 m2

Pondasi P3

Volume P3 = ((0.2+0.35)/2)x0.75)x2x16x2 = 13.20 m3 Jumlah Tulangan Ø12-12.5 = (200/17.5) + 1 = 13 Keliling Ø12-17.5 = 0.2 + 1.75 + 0.2 + 0.75 + 0.75 = 3.65 m Volume Ø12-17.5 = 3.65 x 13 x 122/162 x 32 = 1349.69 kg Jumlah Tulangan Ø10-15 = (300/15) + 1 = 21 Volume Ø12-15 = 2 x 21 x 102/162 x 32 = 829.63 kg Bekisting = ((0.2x2) + (0.75x2)) x 32 = 60.80 m2

Pondasi P4

Volume P4 = ((0.2+0.35)/2)x0.75)x1.6x14x2 = 9.24 m3 Jumlah Tulangan Ø12-17.5 = (160/17.5) + 1 = 11 Keliling Ø12-17.5 = 0.2 + 1.75 + 0.2 + 0.75 + 0.75 = 3.65 m Volume Ø12-17.5 = 3.65 x 11 x 122/162 x 28 = 999.29 kg Jumlah Tulangan Ø10-15 = (300/15) + 1 = 21 Volume Ø12-15 = 1.6 x 21 x 102/162 x 28 = 580.74 kg Bekisting = ((0.2x1.6) + (0.75x2)) x 28 = 50.96 m2

Jumlah Tulangan Ø10-15 = (300/15) + 1 = 21 Volume Ø12-15 = 1.6 x 21 x 102/162 x 28 = 580.74 kg Bekisting = ((0.2x1.6) + (0.75x2)) x 28 = 50.96 m2

Pondasi P5

Volume P5, P6 dan P7 = (((0.25+0.15)/2) x 1.52 x 4) + (((0.2+0.15)/2) x 1.52 x 4) + (((0.15+0.15)/2) x 12 x 8) = 7.70 m3 Jumlah Tulangan Ø12-12.5 = (150/12.5) + 1 = 13 Keliling Ø12-12.5 = (0.15+1.5+0.15+0.75+0.75) + (0.15+1.5+0.15+0.65+0.65) = 6.4 m Volume Ø12-12.5 = 6.4 x 13 x 122/162 x 4 = 293.82 kg Jumlah Tulangan Ø10-12.5 = (150/12.5) + 1 = 13 Keliling Ø10-12.5 = (0.15+1.5+0.15+0.75+0.75) + (0.15+1.5+0.15+0.65+0.65) = 6.4 m Volume Ø10-12.5 = 6.4 x 13 x 102/162 x 4 = 205.43 kg Jumlah Tulangan Ø12-10 = (100/10) + 1 = 11 Keliling Ø12-10 = (0.15+1+0.15+1) = 2.3 m Volume Ø12-10 = 2.3 x 13 x 102/162 x 8 = 147.65 kg Jumlah Tulangan Ø12-20 = (100/20) + 1 = 6 Keliling Ø12-10 = (0.15+1+0.15+1) = 2.3 m Volume Ø12-10 = 2.3 x 6 x 102/162 x 8 = 68.15 kg Bekisting = ((0.15x4.5) + (0.75x1.5))x8 + ((1.5x1x4)x8) = 62.4 m2

= ((0.15x4.5) + (0.75x1.5))x8 + ((1.5x1x4)x8) = 62.4 m2

TOTAL

6 Beton Kolom Struktur Lt.1 Kolom K1

Volume K1 = (0.352x(4-0.25)) x 20 x 2 = 18.38 m3 Volume 12D19 = 4 x 12 x (192/162) x 20 x 2 = 4278.52 kg Keliling Sengkang = ((0.35-(0.02x2))x4) = 1.24 m Jumlah Ø10-10 = (((1/4x400)/10)+1) x 2 = 22 Jumlah Ø10-15 = ((1/2x400)/15) + 1 = 15 Volume Ø10-10 dan Ø10-15 = 1.24 x 37 x 102/162 x 20 x 2 = 1132.8 kg Bekisting = 0.35 x (4-0.25) x 4 x 20 x 2 = 210 m2

Kolom K1A

Volume K1A = (0.352x(4-0.25)) x 12 x 2 = 11.03 m3 Volume 8D19 = 4 x 8 x (192/162) x 12 x 2 = 1711.41 kg Keliling Sengkang = ((0.35-(0.02x2))x4) = 1.24 m Jumlah Ø10-10 = (((1/4x400)/10)+1) x 2 = 22 Jumlah Ø10-15 = ((1/2x400)/15) + 1 = 15

Volume 8D19 = 4 x 8 x (192/162) x 12 x 2 = 1711.41 kg Keliling Sengkang = ((0.35-(0.02x2))x4) = 1.24 m Jumlah Ø10-10 = (((1/4x400)/10)+1) x 2 = 22 Jumlah Ø10-15 = ((1/2x400)/15) + 1 = 15 Volume Ø10-10 dan Ø10-15 = 1.24 x 37 x 102/162 x 12 x 2 = 679.68 kg Bekisting = 0.35 x (4-0.25) x 4 x 12 x 2 = 126 m2

Kolom K2

Volume K2 = (0.32x(4-0.25)) x 10 = 3.38 m3 Volume 8D16 = 4 x 8 x (162/162) x 10 = 505.68 kg Keliling Sengkang = ((0.3-(0.02x2))x4) = 1.04 m Jumlah Ø10-10 = (((1/4x400)/10)+1) x 2 = 22 Jumlah Ø10-15 = ((1/2x400)/15) + 1 = 15 Volume Ø10-10 dan Ø10-15 = 1.04 x 37 x 102/162 x 10 = 237.53 kg Bekisting = 0.3 x (4-0.25) x 4 x 10 = 45 m2

Kolom K3

Volume K3 = (0.4x0.25x(4-0.25)) x 2 x 2 = 1.5 m3 Volume 8D16 = 4 x 8 x (162/162) x 2 x 2 = 202.27 kg Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.25-(0.02x2))x2) = 1.14 m Jumlah Ø10-10 = (((1/4x400)/10)+1) x 2 = 22 Jumlah Ø10-15 = ((1/2x400)/15) + 1 = 15 Volume Ø10-10 dan Ø10-15 = 1.14 x 37 x 102/162 x 2 x 2

Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.25-(0.02x2))x2) = 1.14 m Jumlah Ø10-10 = (((1/4x400)/10)+1) x 2 = 22 Jumlah Ø10-15 = ((1/2x400)/15) + 1 = 15 Volume Ø10-10 dan Ø10-15 = 1.14 x 37 x 102/162 x 2 x 2 = 104.15 kg Bekisting = (0.4+0.25) x 2 x (4-0.25) x 2 x 2 = 19.5 m2

Kolom K4

Volume K4 = (0.4x0.2x(4-0.25)) x 2 = 0.6 m3 Volume 8D16 = 4 x 8 x (162/162) x 2 = 101.14 kg Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.2-(0.02x2))x2) = 1.04 m Jumlah Ø10-10 = (((1/4x400)/10)+1) x 2 = 22 Jumlah Ø10-15 = ((1/2x400)/15) + 1 = 15 Volume Ø10-10 dan Ø10-15 = 1.04 x 37 x 102/162 x 2 = 47.51 kg Bekisting = (0.4+0.2) x 2 x (4-0.25) x 2 = 9 m2

Kolom K4A

Volume K4A = (0.4x0.2x(4-0.25)) x 2 = 0.6 m3 Volume 4D16 = 4 x 4 x (162/162) x 2 = 50.57 kg Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.2-(0.02x2))x2) = 1.04 m Jumlah Ø10-10 = (((1/4x400)/10)+1) x 2 = 22 Jumlah Ø10-15 = ((1/2x400)/15) + 1 = 15 Volume Ø10-10 dan Ø10-15 = 1.04 x 37 x 102/162 x 2

Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.2-(0.02x2))x2) = 1.04 m Jumlah Ø10-10 = (((1/4x400)/10)+1) x 2 = 22 Jumlah Ø10-15 = ((1/2x400)/15) + 1 = 15 Volume Ø10-10 dan Ø10-15 = 1.04 x 37 x 102/162 x 2 = 47.51 kg Bekisting = (0.4+0.2) x 2 x (4-0.25) x 2 = 9 m2

Kolom K5

Volume K5 = (0.5x0.2x(4-0.25)) x 2 = 0.75 m3 Volume 8D16 = 4 x 8 x (162/162) x 2 = 101.14 kg Keliling Sengkang = ((0.5-(0.02x2))x2) + ((0.2-(0.02x2))x2) = 1.24 m Jumlah Ø10-10 = (((1/4x400)/10)+1) x 2 = 22 Jumlah Ø10-15 = ((1/2x400)/15) + 1 = 15 Volume Ø10-10 dan Ø10-15 = 1.24 x 37 x 102/162 x 2 = 56.65 kg Bekisting = (0.5+0.2) x 2 x (4-0.25) x 2 = 10.5 m2

Kolom K6

Volume K5 = (0.4x0.15x(4-0.25)) x 2 = 0.45 m3 Volume 4D16 = 4 x 4 x (162/162) x 2 = 50.57 kg Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.15-(0.02x2))x2) = 0.94 m Jumlah Ø10-10 = (((1/4x400)/10)+1) x 2 = 22 Jumlah Ø10-15 = ((1/2x400)/15) + 1 = 15 Volume Ø10-10 dan Ø10-15 = 0.94 x 37 x 102/162 x 2

Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.15-(0.02x2))x2) = 0.94 m Jumlah Ø10-10 = (((1/4x400)/10)+1) x 2 = 22 Jumlah Ø10-15 = ((1/2x400)/15) + 1 = 15 Volume Ø10-10 dan Ø10-15 = 0.94 x 37 x 102/162 x 2 = 42.94 kg Bekisting = (0.4+0.15) x 2 x (4-0.25) x 2 = 8.25 m2

TOTAL

7 Beton Balok Induk Balok As.10

Volume As.10 = 0.25 x 0.4 x 6.3 x 2 = 1.26 m3 Volume 4D16 dan 5D16 = ((4.5x5) + (1.8x4)) x (162/162) x 2 = 93.87 kg Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.25-(0.02x2))x2) = 1.14 m Jumlah Ø10-10 = ((((1/4x450)/10)+1) x 2) + ((((1/4x180)/10)+1) x 2) = 36 Jumlah Ø10-15 = (((1/2x450)/15) + 1) + (((1/2x180)/15) + 1) = 23 Volume Ø10-10 dan Ø10-15 = 1.14 x 59 x 102/162 x 2 = 83.04 kg Bekisting = (0.4 + (0.25x2)) x 6.3 x 2 = 11.34 m2

Balok As.9

Volume As.9 = 0.25 x 0.6 x 13.8 x 2 = 4.14 m3 Volume 5D19, 6D19 dan 7D19 = ((6.8x5) + (3x6) + (4x7)) x (192/162) x 2 = 356.54 kg Keliling Sengkang = ((0.6-(0.02x2))x2) + ((0.25-(0.02x2))x2) = 1.54 m Jumlah Ø10-10 = ((((1/4x600)/10)+1) x 4) + ((((1/4x180)/10)+1) x 2) = 75 Jumlah Ø10-15 = ((((1/2x600)/15)+1)x2) + (((1/2x180)/15) + 1) = 49 Volume Ø10-10 dan Ø10-15 = 1.54 x 124 x 102/162 x 2 = 235.75 kg Bekisting = (0.6 + (0.25x2)) x 13.8 x 2 = 30.36 m2

Balok As.4-8

Volume As.4-8 = 0.25 x 0.6 x 13.8 x 10 = 20.7 m3 Volume 6D19, 7D19 dan 8D19 = ((3x6) + (0.8x7) + (10x8)) x (192/162) x 10 = 2308.62 kg Keliling Sengkang = ((0.6-(0.02x2))x2) + ((0.25-(0.02x2))x2) = 1.54 m Jumlah Ø10-10 = ((((1/4x600)/10)+1) x 4) + ((((1/4x180)/10)+1) x 2) = 75 Jumlah Ø10-15 = ((((1/2x600)/15)+1)x2) + (((1/2x180)/15) + 1) = 49 Volume Ø10-10 dan Ø10-15 = 1.54 x 124 x 102/162 x 10 = 1178.77 kg Bekisting = (0.6 + (0.25x2)) x 13.8 x 10

((((1/4x180)/10)+1) x 2) = 75 Jumlah Ø10-15 = ((((1/2x600)/15)+1)x2) + (((1/2x180)/15) + 1) = 49 Volume Ø10-10 dan Ø10-15 = 1.54 x 124 x 102/162 x 10 = 1178.77 kg

Bekisting = (0.6 + (0.25x2)) x 13.8 x 10 = 151.8 m2

Balok As.3

Volume As.3 = 0.25 x 0.6 x 13.8 x 2 = 4.14 m3 Volume 6D19, 7D19, 8D19, 10D19 dan 12D19 = ((1.5x6) + (0.8x7) + (7x8) + (3x10) + (1.5x12)) x (192/162) x 2 = 528.58 kg Keliling Sengkang = ((0.6-(0.02x2))x2) + ((0.25-(0.02x2))x2) = 1.54 m Jumlah Ø10-10 = ((((1/4x600)/10)+1) x 4) + ((((1/4x180)/10)+1) x 2) = 75 Jumlah Ø10-15 = ((((1/2x600)/15)+1)x2) + (((1/2x180)/15) + 1) = 49 Volume Ø10-10 dan Ø10-15 = 1.54 x 124 x 102/162 x 2 = 235.75 kg Bekisting = (0.6 + (0.25x2)) x 13.8 x 2 = 30.36 m2

Balok As.2

Volume As.2 = ((0.25x0.6x6)+(0.25x0.7x7.8)) x 2 = 4.53 m3 Volume 5D19, 6D19 dan 7D19 = ((6.8x5) + (3.5x6) + (3.5x7)) x

Volume As.2 = ((0.25x0.6x6)+(0.25x0.7x7.8)) x 2 = 4.53 m3 Volume 5D19, 6D19 dan 7D19 = ((6.8x5) + (3.5x6) + (3.5x7)) x (192/162) x 2 = 354.31 kg Keliling Sengkang 25x60 = ((0.6-(0.02x2))x2) + ((0.25-(0.02x2))x2) = 1.54 m Jumlah Ø10-10 = (((1/4x600)/10)+1) x 2 = 32 Jumlah Ø10-15 = ((1/2x600)/15) + 1 = 21 Volume Ø10-10 dan Ø10-15 = 1.54 x 53 x 102/162 x 2 = 100.77 kg Keliling Sengkang 25x70 = ((0.7-(0.02x2))x2) + ((0.25-(0.02x2))x2) = 1.74 m Jumlah Ø10-10 = (((1/4x780)/10)+1) x 2 = 41 Jumlah Ø10-15 = ((1/2x780)/15) + 1 = 27 Volume Ø10-10 dan Ø10-15 = 1.74 x 68 x 102/162 x 2 = 146.07 kg Bekisting = ((0.6+(0.25x2))x6) + ((0.7+ ((0.25x2))x7.8) x 2 = 31.99 m2

Balok As.A

Volume As.A = 0.25 x 0.4 x 25.2 x 2 = 5.04 m3 Volume 5D16 = 5 x 25.2 x (162/162) x 2 = 398.22 kg Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.25-(0.02x2))x2) = 1.14 m Jumlah Ø10-10 = (((1/4x360)/10)+1) x 2 = 20 Jumlah Ø10-15 = ((1/2x360)/15) + 1 = 13 Volume Ø10-10 dan Ø10-15 = 1.14 x 33 x 102/162 x 2 x 25.2 = 1170.4 kg Bekisting = (0.4 + (0.25x2)) x 25.2 x 2

Jumlah Ø10-10 = (((1/4x360)/10)+1) x 2 = 20 Jumlah Ø10-15 = ((1/2x360)/15) + 1 = 13 Volume Ø10-10 dan Ø10-15 = 1.14 x 33 x 102/162 x 2 x 25.2 = 1170.4 kg Bekisting = (0.4 + (0.25x2)) x 25.2 x 2 = 45.36 m2

Balok As.B

Volume As.B = 0.25 x 0.4 x 28.4 x 2 = 5.68 m3 Volume 4D16, 5D16 dan 7D16 = ((2.7x4) + (25.2x5) + (0.5x7)) x (162/162) x 2 = 443.42 kg Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.25-(0.02x2))x2) = 1.14 m Jumlah Ø10-10 = (1420/10) + 1 = 143 Jumlah Ø10-15 = (1420/15) + 1 = 96 Volume Ø10-10 dan Ø10-15 = 1.14 x 239 x 102/162 x 2 = 336.37 kg Bekisting = (0.4 + (0.25x2)) x 28.4 x 2 = 51.12 m2

Balok As.C

Volume As.C = 0.25 x 0.4 x 28.4 x 2 = 5.68 m3 Volume 4D16, 5D16 dan 7D16 = ((4.3x4) + (25.2x5) + (1.5x7)) x (162/162) x 2 = 485.77 kg

Volume As.C = 0.25 x 0.4 x 28.4 x 2 = 5.68 m3 Volume 4D16, 5D16 dan 7D16 = ((4.3x4) + (25.2x5) + (1.5x7)) x (162/162) x 2 = 485.77 kg Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.25-(0.02x2))x2) = 1.14 m Jumlah Ø10-10 = (1620/10) + 1 = 163 Jumlah Ø10-15 = (1580/15) + 1 = 107 Volume Ø10-10 dan Ø10-15 = 1.14 x 270 x 102/162 x 2 = 380 kg Bekisting = (0.4 + (0.25x2)) x 28.4 x 2 = 51.12 m2

Balok As.D

Volume As.D = 0.25 x 0.4 x 25.2 x 2 = 5.04 m3 Volume 5D16 dan 6D16 = ((23.4x5)+(1.8x6)) x (162/162) x 2 = 403.91 kg Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.25-(0.02x2))x2) = 1.14 m Jumlah Ø10-10 = ((180/10)+1) x 7 = 133 Jumlah Ø10-15 = ((180/15)+1) x 7 = 91 Volume Ø10-10 dan Ø10-15 = 1.14 x 224 x 102/162 x 2 = 315.26 kg Bekisting

((0.25-(0.02x2))x2) = 1.14 m Jumlah Ø10-10 = ((180/10)+1) x 7 = 133 Jumlah Ø10-15 = ((180/15)+1) x 7 = 91 Volume Ø10-10 dan Ø10-15 = 1.14 x 224 x 102/162 x 2 = 315.26 kg Bekisting = (0.4 + (0.25x2)) x 25.2 x 2 = 45.36 m2

Balok As.1'

Volume As.1' = 0.2 x 0.6 x 5.8 x 2 = 1.39 m3 Volume 5D16 = 5 x 5.8 x (162/162) x 2 = 91.65 kg Keliling Sengkang = ((0.6-(0.02x2))x2) + ((0.2-(0.02x2))x2) = 1.44 m Jumlah Ø10-10 = (300/10) + 1 = 31 Jumlah Ø10-15 = (280/15) + 1 = 20 Volume Ø10-10 dan Ø10-15 = 1.44 x 51 x 102/162 x 2 = 90.67 kg Bekisting = (0.6 + (0.2x2)) x 5.8 x 2 = 11.6 m2

Balok B3

Volume As.B3 = 0.25 x 0.4 x 4.5 x 2 = 0.9 m3 Volume 4D16 dan 5D16 = ((3.35x4) + (1.15x5)) x (162/162)

Volume As.B3 = 0.25 x 0.4 x 4.5 x 2 = 0.9 m3 Volume 4D16 dan 5D16 = ((3.35x4) + (1.15x5)) x (162/162) x2 = 30.26 kg Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.25-(0.02x2))x2) = 1.14 m Jumlah Ø10-10 = (230/10) + 1 = 24 Jumlah Ø10-15 = (220/15) + 1 = 16 Volume Ø10-10 dan Ø10-15 = 1.14 x 40 x 102/162 x 2 = 56.3 kg Bekisting = (0.4 + (0.25x2)) x 4.5 x 2 = 8.1 m2

Balok Typikal As.E, F

Volume As.E, F = 0.2 x 0.4 x 11.1 x 2 = 1.78 m3 Volume 5D12 dan 7D12 = ((2.6x5) + (8.5x7)) x (122/162) x 2 = 128.89 kg Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.2-(0.02x2))x2) = 1.04 m Jumlah Ø10-10 = (620/10) + 1 = 63 Jumlah Ø10-15 = (490/15) + 1 = 34 Volume Ø10-10 dan Ø10-15 = 1.04 x 97 x 102/162 x 2 = 124.54 kg Bekisting = (0.4 + (0.2x2)) x 11.1 x 2 = 17.76 m2

Balok Typikal As.D', F'

Volume As.D', F' = 0.15 x 0.4 x 4.4 x 2 = 0.53 m3 Volume 5D12 = 5 x 4.4 x (122/162) x 2 = 39.11 kg Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.15-(0.02x2))x2) = 0.94 m Jumlah Ø10-10 = (260/10) + 1 = 27 Jumlah Ø10-15 = (180/15) + 1 = 13 Volume Ø10-10 dan Ø10-15 = 0.94 x 40 x 102/162 x 2 = 46.42 kg Bekisting = (0.4 + (0.15x2)) x 4.4 x 2 = 6.16 m2

Balok As.1

Volume As.1 = 0.2 x 0.5 x 6 = 0.6 m3 Volume 5D16 dan 7D16 = ((3x5) + (3x7)) x (162/162) = 56.89 kg Keliling Sengkang = ((0.5-(0.02x2))x2) + ((0.2-(0.02x2))x2) = 1.24 m Jumlah Ø10-10 = (300/10) + 1 = 31 Jumlah Ø10-15 = (300/15) + 1 = 21 Volume Ø10-10 dan Ø10-15 = 1.24 x 52 x 102/162 = 39.8 kg Bekisting = (0.5 + (0.2x2)) x 6 = 5.4 m2

Jumlah Ø10-15 = (300/15) + 1 = 21 Volume Ø10-10 dan Ø10-15 = 1.24 x 52 x 102/162 = 39.8 kg Bekisting = (0.5 + (0.2x2)) x 6 = 5.4 m2

Balok As.3'

Volume As.3' = 0.2 x 0.5 x 7.6 = 0.76 m3 Volume 5D16 dan 7D16 = ((3x5) + (3x7)) x (162/162) = 56.89 kg Keliling Sengkang = ((0.5-(0.02x2))x2) + ((0.2-(0.02x2))x2) = 1.24 m Jumlah Ø10-10 = (460/10) + 1 = 47 Jumlah Ø10-15 = (300/15) + 1 = 21 Volume Ø10-10 dan Ø10-15 = 1.24 x 68 x 102/162 = 52.05 kg Bekisting = (0.5 + (0.2x2)) x 7.6 = 6.84 m2

Balok Typikal As.2, 3

Volume As.2, 3 = (0.15x0.4x6.4) + (0.2x0.5x6) x 2 = 1.96 m3 Volume 5D16 = 5 x 6 x (162/162) x 2 = 94.82 kg Volume 5Ø12 = 5 x 6.4 x (122/162) x 2 = 56.88 kg Keliling Sengkang = ((0.5-(0.02x2))x2) + ((0.2-(0.02x2))x2) = 1.24 m Jumlah Ø10-10 = (300/10) + 1 = 31 Jumlah Ø10-15 = (300/15) + 1 = 21 Volume Ø10-10 dan Ø10-15 = 1.24 x 52 x 102/162 x 2 = 79.6 kg

= ((0.5-(0.02x2))x2) + ((0.2-(0.02x2))x2) = 1.24 m Jumlah Ø10-10 = (300/10) + 1 = 31 Jumlah Ø10-15 = (300/15) + 1 = 21 Volume Ø10-10 dan Ø10-15 = 1.24 x 52 x 102/162 x 2 = 79.6 kg Keliling Sengkang = ((0.4-(0.02x2))x2) + ((0.15-(0.02x2))x2) = 0.94 m Jumlah Ø10-10 = (360/10) + 1 = 37 Jumlah Ø10-15 = (280/15) + 1 = 20 Volume Ø10-10 dan Ø10-15 = 0.94 x 57 x 102/162 x 2 = 66.15 kg Bekisting = (((0.4+(0.15x2))x6.4) + ((0.5+(0.2x2))x6)) x 2 = 19.86 m2

TOTAL

8 Beton Balok Anak BA1

Luas Penampang BA1 = 0.25 x 0.4 = 0.1 m2 Volume BA1 (26 balok) = (0.1 x 3.6) x 26 = 9.36 m3 Bekisting BA1 = ((2x0.4x3.35) + (0.25x3.35) x 26 = 91.46 m2 Luas Tulangan 5D16 = 5 x 0.25 x π x 0.0162 = 0.001006 m2 Volume Tulangan 5D16 = (0.001006 x 3.6) x 26 = 0.094 m3 Berat Tulangan 5D16 = 0.094 x 7850 = 737.9 kg Luas Tulangan Ø8-10 dan Ø8-15 = 0.25 x π x 0.0082 = 5.03 x 10-5 m2 Panjang Tulangan

= 5 x 0.25 x π x 0.016 = 0.001006 m2 Volume Tulangan 5D16 = (0.001006 x 3.6) x 26 = 0.094 m3 Berat Tulangan 5D16 = 0.094 x 7850 = 737.9 kg Luas Tulangan Ø8-10 dan Ø8-15 = 0.25 x π x 0.0082 = 5.03 x 10-5 m2 Panjang Tulangan = 2 x (0.17 + 0.32) = 0.98 m Jumlah Tulangan Tumpuan = (2 x 90/10) + 1 = 19 buah Jumlah Tulangan Lapangan = (180/15) + 1 = 13 buah Volume Ø8-10 dan Ø8-15 = (5.03x10-5x0.98) x 32 x 26 = 0.041013 m3 Berat Ø8-10 dan Ø8-15 = 0.041013 x 7850 = 321.95 kg

BA2

Luas Penampang BA2 = 0.2 x 0.4 = 0.08 m2 Volume BA2 (26 balok) = (0.08 x 3.6) x 26 = 7.49 m3 Bekisting BA2 = ((2x0.4x3.35) + (0.2x3.35)) x 26 = 87.1 m2 Luas Tulangan 7D12 = 7 x 0.25 x π x 0.0122 = 0.000792 m2 Volume Tulangan 7D12 = (0.000792 x 3.6) x 26 = 0.0741312 m3 Berat Tulangan 7D12 = 0.0741312 x 7850 = 581.93 kg Luas Tulangan Ø8-10 dan Ø8-15 = 0.25 x π x 0.0082 = 5.03x10-5 m2 Panjang Tulangan = 2 x (0.12 + 0.32) = 0.88 m Jumlah Tulangan Tumpuan = (180/10) + 1 = 19 buah Jumlah Tulangan Lapangan = (180/15) + 1 = 13 buah Volume Ø8-10 dan Ø8-15 = (5.03x10-5 x 0.88) x 32 x 26 = 0.036828 m3 Berat Ø8-10 dan Ø8-15 = 0.036828 x 7850 = 289.1 kg

= 0.036828 x 7850 = 289.1 kg

BA3

Luas Penampang BA3 = 0.15 x 0.2 = 0.03 m2 Volume BA3 (26 balok) = (0.03 x 1.5) x 26 = 1.17 m3 Bekisting BA3 = ((2x0.2x1.25) + (0.15x1.25) x 26 = 17.88 m2 Luas Tulangan 4D12 = 4 x 0.25 x π x 0.0122 = 0.000453 m2 Volume Tulangan 4D12 = (0.000453 x 1.5) x 26 = 0.01765 m3 Berat Tulangan 4D12 = 0.01765 x 7850 = 138.56 kg Luas Tulangan Ø8-10 = 0.25 x π x 0.0082 = 5.03x10-5 m2 Panjang Tulangan = 2 x (0.15 + 0.2) = 0.7 m Jumlah Tulangan = (150/10) + 1 = 16 buah Volume Ø8-10 = (5.03x10-5 x 0.7) x 16 x 26 = 0.01465 m3 Berat Ø8-10 = 0.01465 x 7850 = 114.98 kg

BA4

Luas Penampang BA4 = 0.25 x 0.4 = 0.1 m2 Volume BA4 (2 balok) = (0.1 x 1.2) x 2 = 0.24 m3 Bekisting BA4 = ((2 x 0.4 x 0.7) + (0.25 x 0.7) x 2 = 1.47 m2 Luas Tulangan 4D16 = 4 x 0.25 x π x 0.0162 = 0.000805 m2 Volume Tulangan 4D16 = (0.000805 x 0.9) x 2 = 0.00145 m3 Berat Tulangan 4D16 = 0.00145 x 7850 = 11.37 kg

Luas Tulangan 4D16 = 4 x 0.25 x π x 0.0162 = 0.000805 m2 Volume Tulangan 4D16 = (0.000805 x 0.9) x 2 = 0.00145 m3 Berat Tulangan 4D16 = 0.00145 x 7850 = 11.37 kg Luas Tulangan 8D16 = 8 x 0.25 x π x 0.0162 = 0.001609 m2 Volume Tulangan 8D16 = (0.001609 x 0.3) x 2 = 0.000966 m3 Berat Tulangan 8D16 = 0.000966 x 7850 = 7.58 kg

BA1'

Luas Tulangan Ø8-10 dan Ø8-15 = 0.25 x π x 0.0082 = 5.03x10-5 m2 Panjang Tulangan = 2 x (0.17 + 0.32) = 0.98 m Jumlah Tulangan Ø8-10 = (60/10) + 1 = 7 buah Jumlah Tulangan Ø8-15 = (60/15) + 1 = 5 buah Volume Ø8-10 dan Ø8-15 = (5.03x10-5 x 0.98) x 12 x 2 = 0.001183 m3 Luas Penampang BA1' Berat Ø8-10 dan Ø8-15 = 0.25 x 0.4 = 0.1 m2 = 0.001183 x 7850 = 9.29 kg Volume BA1' (2 balok) = (0.1 x 3.6) x 2 = 0.72 m3 Bekisting BA1' = ((2 x 0.4 x 3) + (0.25 x 3) x 2 = 6.3 m2 Luas Tulangan 7D16 = 7 x 0.25 x π x 0.0162 = 0.001408 m2 Volume Tulangan 7D16 = (0.001408 x 2.7) x 2 = 0.0076032 m3 Berat Tulangan 7D16 = 0.0076032 x 7850 = 59.69 kg Luas Tulangan 5D16 = 5 x 0.25 x π x 0.0162 = 0.001006 m2 Volume Tulangan 5D16 = (0.001006 x 0.9) x 2 = 0.0018103 m3 Berat Tulangan 5D16 = 0.0018103 x 7850 = 14.21 kg

BA As. E' (a)

Luas Tulangan Ø8-10 dan Ø8-15 = 0.25 x π x 0.0082 = 5.03x10-5 m2 Panjang Tulangan = 2 x (0.17 + 0.32) = 0.98 m Jumlah Tulangan Tumpuan = ((180/10) + 1) = 20 buah Jumlah Tulangan Lapangan = ((180/15) + 1) = 13 buah Volume Ø8-10 dan Ø8-15 -5 =Luas (5.03x10 x 0.98) 33 xE'2(a) Penampang BAxAs. 3 == 0.003253 m 2 0.2 x 0.4 = 0.08 m Berat Ø8-10 danE'Ø8-15 Volume BA As. (a) == 0.003253 x = 25.54 (0.08 x 4.2)7850 = 0.336 m3 kg Bekisting BA As. E' (a)

= ((180/10) + 1) = 20 buah Jumlah Tulangan Lapangan = ((180/15) + 1) = 13 buah Volume Ø8-10 dan Ø8-15 -5 =Luas (5.03x10 x 0.98) 33 xE'2(a) Penampang BAxAs. 3 == 0.003253 m 0.2 x 0.4 = 0.08 m2 Berat Ø8-10 danE'Ø8-15 Volume BA As. (a) == 0.003253 x = 25.54 (0.08 x 4.2)7850 = 0.336 m3 kg Bekisting BA As. E' (a) = ((2 x 0.4 x 4.2) + (0.2 x 3.6) = 4.08 m2 Luas Tulangan 7D12 = 7 x 0.25 x π x 0.0122 = 0.000792 m2 Volume Tulangan 7D12 = (0.000792 x 2.2) = 0.00174 m3 Berat Tulangan 7D12 = 0.00174 x 7850 = 13.21 kg Luas Tulangan 8D12 = 8 x 0.25 x π x 0.0162 = 0.000905 m2 Volume Tulangan 8D12 = (0.000905 x 2) = 0.00181 m3 Berat Tulangan 8D12 = 0.00181 x 7850 = 14.21 kg

BA As. E' (b)

Luas Tulangan Ø8-10 dan Ø8-15 = 0.25 x π x 0.0082 = 5.03x10-5 m2 Panjang Tulangan = 2 x (0.12 + 0.32) = 0.88 m Jumlah Tulangan Tumpuan = ((220/10) + 1) = 23 buah Jumlah Tulangan Lapangan = ((200/15)+1) = 15 buah Volume Ø8-10 dan Ø8-15 -5 = (5.03x10 x 0.88) 38 E' (b) Luas Penampang BAxAs. 3 = 0.00168 m 2 = 0.15 x 0.4 = 0.06 m Berat Ø8-10 danE'Ø8-15 Volume BA As. (b) = 0.00168 x 7850 = 13.2 = (0.06 x 2.5) = 0.15 m3 kg Bekisting BA As. E' (b) = ((2 x 0.4 x 2) + (0.15 x 2) = 1.9 m2 Luas Tulangan 7D12 = 7 x 0.25 x π x 0.0122 = 0.000792 m2 Volume Tulangan 7D12 = (0.000792 x 0.7) = 0.00055 m3 Berat Tulangan 7D12 = 0.00055 x 7850 = 4.35 kg Luas Tulangan 5D12 = 5 x 0.25 x π x 0.0122 = 0.000566 m2 Volume Tulangan 5D12 = (0.000566 x 1.8) = 0.00102 m3 Berat Tulangan 5D12 = 0.00102 x 7850 = 7.99 kg Luas Tulangan Ø8-10 dan Ø8-15 = 0.25 x π x 0.0082 = 5.03x10-5 m2 Panjang Tulangan = 2 x (0.07 + 0.32) = 0.78 m Jumlah Tulangan Tumpuan = (140/10) + 1 = 15 buah Jumlah Tulangan Lapangan = (110/15) + 1 = 9 buah

= 0.00102 x 7850 = 7.99 kg Luas Tulangan Ø8-10 dan Ø8-15 = 0.25 x π x 0.0082 = 5.03x10-5 m2 Panjang Tulangan = 2 x (0.07 + 0.32) = 0.78 m Jumlah Tulangan Tumpuan = (140/10) + 1 = 15 buah Jumlah Tulangan Lapangan = (110/15) + 1 = 9 buah Volume Ø8-10 dan Ø8-15 = (5.03x10-5 x 0.78) x 24 = 0.000942 m3 Berat Ø8-10 dan Ø8-15 = 0.000942 x 7850 = 7.39 kg

TOTAL

9 Beton Plat Lantai 2 Plat Bangunan Sayap

Luas Penampang Plat Sayap = (((21x3.6)-0.6) x (13.8-0.25)) + (6.05x1.2) + (6.3x2) - ((352x32) + (0.2x0.4x2) + (0.25x0.4x2) + (0.5x0.2) + (2x2.5 x4.5) + (8x1.2x0.1)) = 325.35 m2 Volume Plat (2 plat) = (325.35 x 0.12) x 2 = 78.08 m3 Bekisting Plat = 325.35 m2 Luas Tulangan Ø10-30 = 0.25 x π x 0.012 = 7.86 x 10-5 m2 Jumlah Tulangan Ø10-30 (arah x) = (1380/30) + 1= 47 buah Jumlah Tulangan Ø8-30 (arah y) = (7560/30) + 1 = 253 buah Volume Ø8-30 = ((7.86x10-5 x 13.8 x 47) + (7.86x10-5 x 75.6 x 253)) x 2 = 3.1087 m3 Berat Ø8-30 = 3.1087 x 7850 = 24403.24 kg

Plat Bangunan Utama

Luas Penampang Plat Bang. Utama = (6x4.2) + (3.6x13) + (2x3.5x0.6) + (0.6x13) + (2.5x8) - (6x3.6) = 82.4 m2 Volume Plat (2 plat) = ((78.2 x 0.1) + (4.2 x 0.15)) x 2 = 16.90 m3 Bekisting Plat = 82.4 m2

= (6x4.2) + (3.6x13) + (2x3.5x0.6) + (0.6x13) + (2.5x8) - (6x3.6) = 82.4 m2 Volume Plat (2 plat) = ((78.2 x 0.1) + (4.2 x 0.15)) x 2 = 16.90 m3 Bekisting Plat = 82.4 m2 Luas Tulangan Ø8-30 = 0.25 x π x 0.0082 = 5.03x10-5 m2 Panjang Tulangan Ø8-30 (arah x) = (((1300/30) + 1) x 4.2) + (((800/30) + 1) x 2.5) = 255.37 m Jumlah Tulangan Ø8-30 (arah y) = (((420/30) + 1) x 6) + (((420/30) + 1) x 7) + (((250/30) + 1) x 8) = 269.67 m Volume Ø8-30 = 5.03x10-5 x (255.37+269.67) = 0.02641 m3 Berat Ø8-30 = 0.02641 x 7850 = 207.31 kg

TOTAL

10 Beton Plat Daak Canopy Luas Penampang Plat Daak Canopy = (3.25x1) + (2x4.2x0.75) + (2x2.5x0.55) + (2x4.2x1) = 20.5 m2 Volume Plat Daak Canopy = 20.5 x 0.1 = 2.05 m3 Bekisting Daak Canopy = 20.5 + (3.25+1+1) + (2x(4.2+0.75+0.75)) + (2x(2.5+0.55+0.55)) + (2x(4.2+1+1)) = 56.75 m2 Volume Ø8-30 arah x = ((3.25x(100/30)) + (2x4.2x(75/30)) + (2x2.5x(55/30)) + (2x4.2x(100/30))) x 82/162 = 28.05 kg Volume Ø8-30 arah y = ((1x(325/30)) + (2x0.75x(420/30)) + (2x0.55x(250/30)) + (2x1x(420/30))) x 82/162 = 27.65 kg

Volume Ø8-30 arah y = ((1x(325/30)) + (2x0.75x(420/30)) + (2x0.55x(250/30)) + (2x1x(420/30))) x 82/162 = 27.65 kg

TOTAL

11 Beton Listplank Volume Beton Listplank = ((0.08x0.6) + (0.18x0.65) + ((10x10)/2)) x 3 = 0.51 m3 Bekisting Listplank = ((45x300)x2) + (33x300) + ((14x300)x2) + (15x300) + (10x300) = 52800 cm2 = 5.28 m2 Volume Ø8-15 Memanjang Jumlah: = ((630/15)+1) x 2 = 86 = ((200/15)+1) x 4 = 56 = ((150/15)+1) x 2 = 22 = ((600/15)+1) x 8 = 328 = ((360x7/15)+1) x 2 = 338 = ((360x6/15)+1) x 2 = 290 = ((120/15)+1) x 4 = 36 = ((380/15)+1) x 2 = 52 = ((420/15)+1) x 2 = 58 = ((350/15)+1) x 2 = 48 = ((180/15)+1) x 2 = 26 Total = 3 Panjang = 45 + 19.3 + 75 + (2x(4x0.8 + 6x0.8)) = 155.3 cm Volume = (0.25x π x0.0082x1.55) x 3 x 7850 = 1.83 kg Volume Ø8-15 Memanjang Panjang: = 630 x 2 = 1260 = 200 x 4 = 800 = 150 x 2 = 300 = 600 x 8 = 4800 = 360 x 7 x 2 = 5040 = 360 x 6 x 2 = 4320 = 120 x 4 = 480 = 380 x 2 = 760 = 420 x 2 = 840 = 350 x 2 = 700 = 180 x 2 = 360 Total = 3 m

TOTAL

= 200 x 4 = 800 = 150 x 2 = 300 = 600 x 8 = 4800 = 360 x 7 x 2 = 5040 = 360 x 6 x 2 = 4320 = 120 x 4 = 480 = 380 x 2 = 760 = 420 x 2 = 840 = 350 x 2 = 700 = 180 x 2 = 360 Total = 3 m Jumlah = ((155.3/15)+1) = 11 Volume = (0.25xπx0.0082x3) x 7850 = 1.18 kg

12 Tangga Beton Tangga Depan

Volume Beton Tangga - Anak Tangga = ((18,18x30)/2) x 80 x 20 = 0.44 m3 - Bordes = 147.5 x 200 x 18 = 0.53 m3 - Plat Tangga = 18 x 360.56 x 80 x 2 = 1.04 m3 - Balok Bordes = 40 x 20 x 200 = 0.16 m3 - Bordes Lantai 2 = (58.33x10x80) + (10x10x80/2) = 0.05 m3 Bekisting - Plat Tangga = (360.55x80x2) + ((18+15.55)x360.55x2x2) = 10.61 m2 - Anak Tangga = 18.18 x 80 x 22 = 3.20 m2 - Bordes = ((147.5x18)+(80x18)) + (147.5x200) = 3.36 m2 - Balok Bordes = (200x40)x2 + (20x200) = 2 m2 - Bordes Lantai 2 = (58.33x80x2) + (10x80) + (58.33x10x2) + (10x10x2/2) = 1.14 m2 Tulangan - Anak Tangga Melintang 1Ø10 = (0.25xπx0.12x0.8) x 7850 x 22 = 10.85 kg - Anak Tangga Memanjang Ø8-20 = (0.25xπx0.082x0.64) x 7850 x 110 = 27.84 kg - Plat Melintang Ø8-15 = (0.25xπx0.082x0.8) x 7850 x 100 = 31.55 kg - Plat Memanjang Bawah I D16-12.5 = (0.25xπx0.162x4.81) x 7850 x 7 = 53.19 kg - Plat Memanjang Atas I D16-12.5

- Anak Tangga Memanjang Ø8-20 = (0.25xπx0.082x0.64) x 7850 x 110 = 27.84 kg - Plat Melintang Ø8-15 = (0.25xπx0.082x0.8) x 7850 x 100 = 31.55 kg - Plat Memanjang Bawah I D16-12.5 = (0.25xπx0.162x4.81) x 7850 x 7 = 53.19 kg - Plat Memanjang Atas I D16-12.5 = (0.25xπx0.162x5.17) x 7850 x 7 = 56.83 kg - Plat Memanjang Bawah II D16-12.5 = (0.25xπx0.162x6.05) x 7850 x 7 = 66.86 kg - Plat Memanjang Atas II D16-12.5 = (0.25xπx0.162x6.18) x 7850 x 7 = 68.32 kg - Tulangan Bordes Memanjang ke Bawah D16-12.5 = (0.25xπx0.162x2.17) x 7850 x 7 = 24.07 kg - Tulangan Bordes Memanjang ke Atas D16-12.5 = (0.25xπx0.162x3.11) x 7850 x 7 = 34.35 kg - Tulangan Bordes Memanjang Lantai 2 D16-12.5 = (0.25xπx0.162x1.84) x 7850 x 7 = 20.37 kg - Tulangan Bordes Melintang Ø8-15 = (0.25xπx0.082x2) x 7850 x 20 = 15.78 kg - Tulangan Bordes Lantai 2 Melintang Ø8-10 = (0.25xπx0.082x0.8) x 7850 x 7 = 2.21 kg - Tulangan Bordes Lantai 2 Memanjang Ø8-10 = (0.25xπx0.082x0.76) x 7850 x 9 = 2.7 kg - Balok Bordes Memanjang 6D16 = (0.25xπx0.162x2) x 7850 x 6 = 18.93 kg - Balok Bordes Ø8-15 = (0.25xπx0.082x1.2) x 7850 x 14 = 6.63 kg Volume 2 Tangga Depan Beton = 2.22 x = 4.44 m3 Bekisting = 20.31 x 2 = 40.62 m2 Polos = 97.29 x 2 = 194.58 kg Ulir = 342.38 x 2 = 684.76 kg

Tangga Belakang

Volume Beton Tangga - Anak Tangga = ((18,18x30)/2) x 76.25 x 20 = 0.2 m3 - Bordes = 122.5 x 172.5 x 18 = 0.38 m3 - Plat Tangga = 18 x 360.56 x 76.25 x 2 = 0.99 m3 - Balok Bordes = 40 x 20 x 172.5 = 0.14 m3 - Bordes Lantai 2 = (58.33x10x76.25) + (10x10x76.25/2) = 0.05 m3 Bekisting - Plat Tangga = (360.55x76.25x2) + ((18+15.55)x360.55x2x2) = 10.28 m2 - Anak Tangga = 18.18 x 76.25 x 22 = 3.05 m2 - Bordes = ((122.5x18)+(76.25x18)) + (122.5x172.5) = 2.47 m2 - Balok Bordes = (172.5x40)x2 + (20x172.5) = 1.73 m2 - Bordes Lantai 2 = (58.33x76.25x2) + (10x76.25) + (58.33x10x2) + (10x10x2/2) = 1.09 m2 Tulangan - Anak Tangga Melintang 1Ø10 = (0.25xπx0.12x0.76) x 7850 x 22 = 10.34 kg - Anak Tangga Memanjang Ø8-20 = (0.25xπx0.082x0.64) x 7850 x 88 = 22.41 kg - Plat Melintang Ø8-15 = (0.25xπx0.082x0.76) x 7850 x 100 = 30.07 kg - Plat Memanjang Bawah I D16-12.5 = (0.25xπx0.162x4.72) x 7850 x 7 = 52.15 kg - Plat Memanjang Atas I D16-12.5 = (0.25xπx0.162x4.96) x 7850 x 7 = 54.77 kg - Plat Memanjang Bawah II D16-12.5 = (0.25xπx0.162x5.85) x 7850 x 7 = 64.55 kg - Plat Memanjang Atas II D16-12.5 = (0.25xπx0.162x5.8) x 7850 x 7 = 64.09 kg - Tulangan Bordes Memanjang ke Bawah D16-12.5

= 54.77 kg - Plat Memanjang Bawah II D16-12.5 = (0.25xπx0.162x5.85) x 7850 x 7 = 64.55 kg - Plat Memanjang Atas II D16-12.5 = (0.25xπx0.162x5.8) x 7850 x 7 = 64.09 kg - Tulangan Bordes Memanjang ke Bawah D16-12.5 = (0.25xπx0.162x1.98) x 7850 x 7 = 21.83 kg - Tulangan Bordes Memanjang ke Atas D16-12.5 = (0.25xπx0.162x2.81) x 7850 x 7 = 31.04 kg - Tulangan Bordes Memanjang Lantai 2 D16-12.5 = (0.25xπx0.162x1.74) x 7850 x 7 = 19.2 kg - Tulangan Bordes Melintang Ø8-15 = (0.25xπx0.082x1.73) x 7850 x 18 = 12.25 kg - Tulangan Bordes Lantai 2 Melintang Ø8-10 = (0.25xπx0.082x0.76) x 7850 x 7 = 2.11 kg - Tulangan Bordes Lantai 2 Memanjang Ø8-10 = (0.25xπx0.082x0.76) x 7850 x 8 = 2.4 kg - Balok Bordes Memanjang 6D16 = (0.25xπx0.162x1.73) x 7850 x 6 = 16.33 kg - Balok Bordes Ø8-15 = (0.25xπx0.082x1.2) x 7850 x 12 = 5.68 kg Volume 2 Tangga Belakang Beton = 1.76 x = 3.52 m3 Bekisting = 18.62 x 2 = 37.24 m2 Polos = 85.26 x 2 = 170.52 kg Ulir = 323.96 x 2 = 647.92 kg

TOTAL

TOTAL

13 Water Proofing Daak Canopy Luas Daak Canopy - Daak Canopy Gedung Sayap = 2 x ((4.2x1) + (2.5x0.55) + (4.2x0.75)) = 8.73 m2 - Daak Canopy Utama = 3.25 x 1 = 3.25 m2

TOTAL b

Pekerjaan Beton Bertulang Lt. 2

1

Beton Kolom Struktur Lt.2 Kolom K1

Kolom K3

Kolom K4

Kolom K4A

Kolom K5

TOTAL

2 Beton Balok Ring

TOTAL

TOTAL

3 Beton Plat Daak

TOTAL

4 Waterproof Plat Daak

III

Pekerjaan Rangka Dan Atap

1

Kuda-kuda Baja Ringan

2

Atap genteng keramik glasur Luas Sayap= [((3,6 x 7 + 2,4 + 3,6 x 3) x 9,353/2 x 2) + (2/2 x 16,2 x 9,614)] x 2 Luas B.Utama=((8,4 + 2) x 3,523/2 x 2) + (2/2 x 6 x 3,695) Volume= 1.029,811 + 58,812 = 1.088,623

3

Bubungan Genteng Keramik Glasur

4

Ornamen Puncak Atap VOLUME = 2 + 2 + 2 = 6 bh

5

Corong Talang VOLUME = 8,5 x 8 m = 68 m

6

Listplank Kayu Bengkirai 266.8 m'

7

Flashing Atap

266.8 m'

Volume

Satuan

Galian

5

602

m3

Galian

2.5

635.06

Galian

dan P6 x 2,5 x 8

169

x8

Galian = 0.5625m

m3

2

m3

= 0.5625m2

36 m3

5 m2

3.375

m3

Galian 0

m3

Galian 0

m3

1,875 m2

Galian 0

m3

.85 m3

Galian 1409.435

m3

Urugan 469.812

Urugan 469.812

m3

m3

Sirtu 47.29

m3

Sirtu 51.14

m3

Sirtu 7.13

m3

Sirtu 105.56

m3

Lantai K. 12.4

m3

1

Lantai K. 13.33

m3

Lantai K. 2.98

m3

Lantai K. 28.71

m3

Beton 11.52

m3

10D19 1711.41

kg

+ ((0.25-

2

Ø12-10 1052.68

kg

2

2

+ ((0.25-

Beton 6.24

m3

6D19 556.21

kg

Ø10-15 265.22

kg

2

3

+ ((0.25-

Beton 9.6

m3

10D19 1426.17

kg

Ø12-10 877.46

kg

2

4

+ ((0.25-

Beton 6.72

m3

6D19 598.99

kg

+ ((0.25-

Ø10-15 285.19

kg

2

Beton 34.08 Tul. Ulir 3292.78 Tul. Polos 2080.55 0.4 = 0.08

Beton

g. Sayap 2) = 14,04 m3 ) = 0.132 m3 .16 m3 0.288 m3 ) = 0.275 m3 ) = 0.26 m3 ) = 0.196 m3 = 0.296 m3 = 0.664 m3 = 0.232 m3

19.49

g. Utama 57 m3 0.468 m3 1.056 m3 0.624 m3 = 0.344 m3

16 x2

02)x2)

5m

75 m

2 = 580

m3 kg kg

m3

Bekisting 194.92

m2

6D16 2567.58

kg

Ø10-10 dan Ø10-15 1568

kg

02)x2)

5m

75 m

2 = 580 -15 2 70 kg

16 377.36 kg

02)x2)

m

m

= 202 -15 2

(36.85x0.4x2)

0.6 = 0.12

g. Sayap = 9.49 m3 2) = 1.04 m3 = 1.78 m3 1.40 m3

g. Utama .37 m3 = 0.70 m3

Beton 15.77

m3

Bekisting 157.8

m2

12D16 2615

kg

g. Utama .37 m3 = 0.70 m3

D16 x2

Ø10-10 dan Ø10-15 1117.04

02)x2) m

m

2 = 300 -15 2 4 kg

D16 2

2)x2)

98 -15 2

17.2x0.6x2)

Beton

kg

35.26 Bekisting 352.72 Tul. Ulir 5182.58 Tul. Polos 2685.04

5) x 2 x 16 x 2

m3 m2 kg kg

Beton 11

m3

-15

Bekisting

65 + 0.65

191.9

m2

32

Ø12-15 dan Ø10-15

-15

2161.78

kg

2

) x 32) + 5))

5)x1.6x13x2

Beton 7.15

m3

-20

Bekisting

65 + 0.65

35.36

m2

26

Ø12-15 dan Ø10-15

-15

1169.42 26

1.6)) x 26

kg

-15 26

1.6)) x 26

)x2x16x2

Beton 13.2

m3

-12.5

Bekisting

.75 + 0.75

60.8

m2

x 32

Ø12-12.5 dan Ø10-15

-15

2179.32

kg

2

x 32

)x1.6x14x2

Beton 9.24

m3

-17.5

.75 + 0.75

Bekisting 50.96

m2

x 28

Ø12-17.5 dan Ø10-15

-15

x 28

2)) x 28

1580.03

kg

-15

x 28

2)) x 28

7 .52 x 4) + x 4) + x 8)

-12.5

Beton 7.7

m3

Bekisting 62.4

m2

5+0.75) + +0.65)

Tulangan Polos

x4

-12.5

5+0.75) + +0.65)

x4

-10

2.3 m

x8

-20

2.3 m

8

x1.5))x8 +

715.05

kg

x1.5))x8 +

Beton 48.29 Bekisting 401.42 Tul. Polos 6805.6

m3 m2 kg

Beton

0x2

20 x 2

18.38

m3

Bekisting 210

m2

= 1.24 m

x 2 = 22

= 15 Ø10-15 x 20 x 2

x 20 x 2

2x2

12 x 2

= 1.24 m

x 2 = 22

= 15

12D19 4278.52

kg

Ø10-10 dan Ø10-15 1132.8

kg

Beton 11.03

m3

Bekisting 126

m2

12 x 2

= 1.24 m

x 2 = 22

= 15 Ø10-15 x 12 x 2

8D19 1711.41

kg

Ø10-10 dan Ø10-15

x 12 x 2

679.68

kg

Beton 3.38

10

m3

Bekisting 45

m2

= 1.04 m

x 2 = 22

= 15 Ø10-15 x 10

8D16 505.68

kg

Ø10-10 dan Ø10-15

10

237.53

kg

Beton x2x2

2x2

+ 1.14 m

x 2 = 22

= 15 Ø10-15 x2x2

1.5

m3

Bekisting 19.5 8D16

m2

+ 1.14 m

x 2 = 22

= 15 Ø10-15 x2x2

0.25) x 2 x 2

x2

2

+ .04 m

x 2 = 22

202.27

kg

Ø10-10 dan Ø10-15 104.15

kg

Beton 0.6

m3

Bekisting 9

m2

8D16 101.14

kg

= 15 Ø10-15 x2

.25) x 2

x2

2

+ 1.04 m

x 2 = 22

= 15 Ø10-15 x2

Ø10-10 dan Ø10-15 47.51

kg

Beton 0.6

m3

Bekisting 9 4D16

m2

+ 1.04 m

x 2 = 22

= 15 Ø10-15 x2

.25) x 2

x2

2

50.57

kg

Ø10-10 dan Ø10-15 47.51

kg

Beton 0.75

m3

Bekisting 10.5

+ .24 m

x 2 = 22

m2

8D16 101.14

kg

= 15 Ø10-15 x2

Ø10-10 dan Ø10-15

.25) x 2

x2

2

+ 0.94 m

x 2 = 22

= 15 Ø10-15 x2

56.65

kg

Beton 0.45

m3

Bekisting 8.25 8D16

m2

+ 0.94 m

x 2 = 22

50.57

kg

= 15 Ø10-15 x2

Ø10-10 dan Ø10-15 42.94

0.25) x 2

Beton 36.69 Bekisting 437.25 Tul. Ulir 5001.3 Tul. Polos 2348.77

kg

m3 m2 kg kg

Beton 1.26

16 x (162/162) x 2

m3

Bekisting 11.34

m2

+

= 1.14 m

x 2) + x 2) = 36

+ = 23 Ø10-15 x2

.3 x 2

4D16 dan 5D16 93.87

kg

Ø10-10 dan Ø10-15 83.04

kg

2

Beton 4.14

dan 7D19 4x7)) x

m3

Bekisting 30.36

m2

+

= 1.54 m

x 4) + x 2) = 75

x2) + = 49 Ø10-15 2x2

3.8 x 2

10

dan 8D19 10x8)) x

5D19, 6D19, dan 7D19 356.54

Ø10-10 dan Ø10-15 235.75

+

x 4) +

x 2) = 75

x2) + = 49 Ø10-15 2 x 10

3.8 x 10

kg

Beton 20.7

m3

Bekisting 151.8

= 1.54 m

kg

m2

6D19, 7D19, dan 8D19 2308.62

Ø10-10 dan Ø10-15

kg

x 2) = 75

x2) + = 49 Ø10-15 2 x 10

Ø10-10 dan Ø10-15 1178.77

kg

3.8 x 10

Beton

2

4.14

8D19, 10D19

Bekisting

(7x8) + 192/162) x 2

+

= 1.54 m

m3

30.36

m2

6D19, 7D19, 8D19, 10D19 dan 12D19

x 4) +

x 2) = 75

x2) + = 49 Ø10-15 2x2

528.58

Ø10-10 dan Ø10-15

3.8 x 2

5x0.7x7.8)) x 2

dan 7D19 (3.5x7)) x

kg

235.75

Beton

kg

5x0.7x7.8)) x 2

dan 7D19 (3.5x7)) x

4.53 Bekisting 31.99

x60 + 1.54 m

x 2 = 32

= 21 Ø10-15 x2

m3

m2

5D19, 6D19, dan 7D19 354.31

kg

Ø10-10 dan Ø10-15

x70 + 1.74 m

246.84

kg

x 2 = 41

= 27 Ø10-15 x2

+ ((0.7+

2

x2

Beton 5.04

m3

Bekisting 45.36

m2

+

= 1.14 m

x 2 = 20

= 13 Ø10-15 x 2 x 25.2

5.2 x 2

5D16 398.22

kg

x 2 = 20

= 13 Ø10-15 x 2 x 25.2

5.2 x 2

2

dan 7D16 + (0.5x7)) x

+

= 1.14 m

Ø10-10 dan Ø10-15 1170.4

kg

Beton 5.68

m3

Bekisting 51.12

m2

4D16, 5D16, dan 7D16 443.42

kg

Ø10-15 2x2

8.4 x 2

2

dan 7D16 + (1.5x7)) x

Ø10-10 dan Ø10-15 336.37

kg

Beton 5.68

m3

2

dan 7D16 + (1.5x7)) x

Bekisting 51.12

+

m2

4D16, 5D16, dan 7D16

= 1.14 m

485.77

7 Ø10-15 2x2

kg

Ø10-10 dan Ø10-15

8.4 x 2

2

16 x (162/162) x 2

380

kg

Beton 5.04

m3

Bekisting 45.36

m2

+ 1.14 m

133

91 Ø10-15 2x2

5D16, dan 6D16 403.91

kg

1.14 m

133

91 Ø10-15 2x2

Ø10-10 dan Ø10-15

5.2 x 2

x2

+ .44 m

315.26

kg

Beton 1.39

m3

Bekisting 11.6

m2

5D16 91.65

kg

Ø10-15 x2

8x2

16 )) x (162/162)

Ø10-10 dan Ø10-15 90.67

Beton

kg

0.9

16 )) x (162/162)

m3

Bekisting 8.1

+ 1.14 m

m2

4D16, dan 5D16 30.26

kg

Ø10-15 x2

Ø10-10 dan Ø10-15

.5 x 2

56.3

kg

Beton 1.78

12 x (122/162) x 2

m3

Bekisting 17.76

m2

+ .04 m

Ø10-15 x2

1x2

5D12, dan 7D12 128.89

kg

Ø10-10 dan Ø10-15 124.54

kg

Beton 0.53

2

Bekisting 6.16

.94 m

m3

m2

5D12 39.11

kg

10-15 2

Ø10-10 dan Ø10-15 x2

16 62/162)

46.42

kg

Beton 0.6

m3

Bekisting 5.4

m2

+ .24 m

Ø10-15

5D16, dan 7D16 56.89

kg

Ø10-15

16 62/162)

Ø10-10 dan Ø10-15 39.8

kg

Beton 0.76

m3

Bekisting 6.84

m2

+ .24 m

Ø10-15

6

.2x0.5x6) x 2

2

5D16, dan 7D16 56.89

kg

Ø10-10 dan Ø10-15 52.05

kg

Beton 1.96

m3

Bekisting 19.86

m2

x2

+ 1.24 m

Ø10-15 x2

5D16 94.82

5Ø12,Ø10-10 dan Ø10-15

kg

+ 1.24 m

Ø10-15 x2

5Ø12,Ø10-10 dan Ø10-15 202.63

kg

+ 0.94 m

Ø10-15 x2

4) + 2

k) 36 m3

5x3.35) x 26

6 6 = 0.094 m3

9 kg

dan Ø8-15 5.03 x 10-5 m2

Beton 64.13 Bekisting 524.53 Tul. Ulir 3871.75 Tul Polos 3294.59

m3 m2 kg kg

Beton 9.36

m3

Bekisting 91.46

m2

5D16 737.9

kg

6 6 = 0.094 m3

9 kg

dan Ø8-15 5.03 x 10-5 m2

.98 m puan buah ngan uah -15 2 x 26

Ø8-10 dan Ø8-15 321.95

kg

5 321.95 kg

2

k) 7.49 m3

2x3.35)) x 26

Beton 7.49 Bekisting 87.1

2

7D12

12 26

581.93

= 581.93 kg

dan Ø8-15 5.03x10-5 m2

0.88 m mpuan uah angan uah 8-15 32 x 26

15 289.1 kg

m3

m2

kg

Ø8-10 dan Ø8-15 289.10

kg

289.1 kg

k) .17 m3

5x1.25) x 26

2

2 6

38.56 kg

Beton 1.17

m3

Bekisting 17.88

m2

4D12 138.56

kg

Ø8-10 114.98

kg

5.03x10-5 m2

7m

uah

6 x 26

14.98 kg

4

Beton 0.24

m3

) 4 m3

.25 x 0.7) x 2

Bekisting 1.47

2

16 2

1.37 kg

4D16 dan 8D16

m2

2

16 2

18.95

kg

1.37 kg

Ø8-10 dan Ø8-15

2

16 2

9.29

kg

7.58 kg

dan Ø8-15 5.03x10-5 m2

0.98 m 10 h 15 h 8-15 12 x 2

1' 15 9.29 kg k) 2 m3

5 x 3) x 2

Beton 0.72

m3

Bekisting 6.30

m2

2

16 2

7D16 dan 5D16 73.9

kg

59.69 kg

2

Ø8-10 dan Ø8-15

16 2

25.54

14.21 kg

dan Ø8-15 5.03x10-5 m2

0.98 m mpuan buah angan buah 8-15 33 xE'2(a) As.

15 25.54 m3 kg

a)

Beton

kg

buah angan buah 8-15 33 xE'2(a) As.

15 25.54 m3 kg

0.336

a) .2 x 3.6)

Bekisting 4.08

m3

m2

2

12 0.00174 m3

3.21 kg

2

12 00181 m3

7D12 dan 8D12 27.42

kg

Ø8-10 dan Ø8-15 13.20

kg

4.21 kg

dan Ø8-15 5.03x10-5 m2

0.88 m mpuan buah angan uah 8-15 38 E' (b) As.

2

Beton

15 3.2 3 kg m

0.15

b) 5 x 2)

Bekisting 1.90

m3

m2

2

12 0.00055 m3

.35 kg

2

12 0.00102 m3

.99 kg

dan Ø8-15 5.03x10-5 m2

0.78 m mpuan uah angan ah

7D12 dan 5D12 12.34

kg

Ø8-10 dan Ø8-15 7.39

kg

.99 kg

dan Ø8-15 5.03x10-5 m2

0.78 m mpuan uah angan ah 8-15 24

15 7.39 kg

Beton 19.46 Bekisting 210.19 Tul. Ulir 1591 Tul. Polos 781.45

m2 kg kg

Beton

Sayap 3.8-0.25)) + ((352x32) + .4x2) + 5) + m2

Bekisting

= 78.08 m3

325.35

0 .86 x 10-5 m2 -30 (arah x) uah 30 (arah y) buah

m3

78.08

m3

m2

Ø10-30 24403.24

kg

47) + 3)) x 2

403.24 kg

Bang. Utama + (2x3.5x0.6) (6x3.6)

x 0.15)) x 2

Beton 16.90 Bekisting

m3

+ (2x3.5x0.6) (6x3.6)

x 0.15)) x 2

82.40

m2

Ø8-30

5.03x10 m -30 (arah x) .2) + = 255.37 m 30 (arah y) + (((420/30) + 1) x 8) -5

2

207.31

kg

+269.67)

07.31 kg

Daak Canopy 0.75) + x1) = 20.5 m2 nopy

Beton 84.98 Bekisting 407.75 Tul. Polos 17610.55

m3 m2 kg

Beton 2.05

m3

3

py + + + 5 m2

2.5x(55/30)) 82/162

162

Bekisting 56.75

m2

Ø8-30 55.70

kg

162

nk x0.65) + 1 m3

x300) + 00) +

2

Beton 2.05 Bekisting 56.75 Tul. Polos 55.70

0.51

5.28

86 56 22 328 = 338 = 290 36 52 58 48 26

3.01

njang

kg

m3

Bekisting

Ø8-15

55) x 3 x 7850

m2

Beton

njang

x(4x0.8 +

m3

m2

kg

x 7850 = 1.18

Beton 0.51 Bekisting 5.28 Tul. Polos 3.01

m3 m2 kg

Beton

a x 20

4.44

m3

Bekisting 40.62

m2

2

Polos 194.58

kg

0x10x80/2)

2x2)

8)) +

200)

x80) + 0x2/2)

ang 1Ø10 7850 x 22

njang Ø8-20 ) x 7850 x 110

5 x 7850 x 100

wah I

) x 7850 x 7

s I D16-12.5

Ulir 684.76

kg

njang Ø8-20 ) x 7850 x 110

5 x 7850 x 100

wah I

) x 7850 x 7

s I D16-12.5 ) x 7850 x 7

wah II

) x 7850 x 7

s II D16-12.5 ) x 7850 x 7

emanjang ke

) x 7850 x 7

emanjang ke

) x 7850 x 7

emanjang

) x 7850 x 7

elintang

7850 x 20

ntai 2

x 7850 x 7

ntai 2

) x 7850 x 9

anjang 6D16 7850 x 6

5 x 7850 x 14

pan m3 = 40.62 m2 94.58 kg 84.76 kg

Beton

a

.25 x 20

3.52

m3

Bekisting x2

2x2)

x18)) +

x172.5)

(10x76.25) + 0x2/2)

ang 1Ø10 x 7850 x 22

njang Ø8-20 ) x 7850 x 88

5 ) x 7850 x 100

wah I

) x 7850 x 7

s I D16-12.5 ) x 7850 x 7

wah II

) x 7850 x 7

s II D16-12.5 x 7850 x 7

emanjang ke

37.24

m2

Polos 170.52

kg

Ulir 647.92

kg

wah II

) x 7850 x 7

s II D16-12.5 x 7850 x 7

emanjang ke

) x 7850 x 7

emanjang ke

) x 7850 x 7

emanjang

) x 7850 x 7

elintang

) x 7850 x 18

ntai 2

) x 7850 x 7

ntai 2

) x 7850 x 8

anjang 6D16 ) x 7850 x 6

5 x 7850 x 12

akang m3 = 37.24 m2 70.52 kg 47.92 kg

Beton 7.96 Bekisting 77.86

m3 m2

ng Sayap 0.55) +

Tul. Ulir 365.10 Tul. Polos 1332.68

kg kg

Waterproof 11.98

m2

Waterproof 11.98

m2

a

Beton 11.15 Bekisting 437.25 Tulangan 2910.15

m3 m2 kg

Beton

9.7 Bekisting 125.35 Tulangan 778.5

m3 m2 kg

Beton 3.97 Bekisting 39.72 Tulangan 421.92

m3 m2 kg

1186.88

m2

1088.623

m2

2.41

m

6

bh

68

m

268.8

m'

268.8

m'

268.8

m'

C

Pekerjaan Finishing Arsitektur

a.

Pekerjaan Finishing Arsitektur Lantai 1

I.

Pekerjaan Pondasi

1

Pemasangan Pondasi Batu Belah 1SP: 6 PP

2

Aanstamping

3

Urug pasir bawah pondasi + urug pasir bawah rolag Urug pasir bawah pondasi

Urug pasir bawah rolag

4

Urugan tanah peninggian bangunan t= 60 cm

> Luas urug tanah peninggian bangunan t= 60 cm = 40,6 x 31,4 = 1274,84 m² > Volume urug tanah peninggian bangunan t= 60 cm = 1274,84 x 60 = 764,904 m³

II.

Pekerjaan Pasangan Bt Bata / Plesteran

1

Pas. rollag 1:3

2

Pas. bt. bata 1:3

3

Pas. bt. bata 1:6

4

Plesteran 1:3

5

Plesteran 1:6

6

Plesteran Beton

7

Beton Praktis Sloof

8

Beton Praktis Kolom

9

Beton Praktis Balok Latei

III

PEKERJAAN PASANGAN KOSEN

1

KOSEN ALUMINIUM 4" TYPE J2 (2 bh)

TYPE J3 (2 bh)

TYPE J4 (4 bh)

TYPE J5 (2 bh)

TYPE J6 (2 bh)

TYPE PJ2 (26 bh)

TYPE PJ3 (26 bh)

TYPE BV1 (29 bh)

TYPE J1 (2)

TYPE PJ1 (1 bh)

TYPE P1 (4 bh)

TYPE P2 (1 bh)

TYPE P3 (27 bh)

2

kaca bening 5mm TYPE J2 (2 bh)

TYPE J3 (2 bh)

TYPE J4 (4 bh)

TYPE J5 (2 bh)

TYPE J6 (2 bh)

TYPE PJ2 (26 bh)

TYPE PJ3 (26 bh)

TYPE BV1 (29 bh)

TYPE PJ1 ( 1 bh)

TYPE J1 ( 2 bh)

TYPE P1 ( 4bh)

3

kaca raam jendela 5mm TYPE J2 (2 bh)

TYPE J3 (2 bh)

TYPE J4 (4 bh)

TYPE J5 (2 bh)

TYPE J6 (2 bh)

TYPE PJ2 (26 bh)

TYPE PJ3 (26 bh)

TYPE BV1 (29 bh)

TYPE PJ1 ( 1 bh)

TYPE J1 ( 2 bh)

TYPE P1 ( 4bh)

4

Kunci Tanam

5

floor hinges

6

Kunci raam alluminium

7

Engsel pintu a. Type P1 (4bh)

b. Type PJ3 (62 bh)

c. Type PJ2 (62 bh)

d. Type PJ1 (4bh)

8

Daun pintu double teakwood TYPE PJ2

TYPE PJ3

TYPE P2 (1 bh)

9

Pintu PVC lengkap kunci,engsel,kusen

10

Pintu raam alluminium

11

suncreen Hellow finish cat Besar

kecil

12

Raam Jendela Aluminium TYPE J3 (4 bh)

TYPE J4 (4 bh)

TYPE J5 (2 bh)

TYPE PJ2 (26 bh)

TYPE PJ3 (26 bh)

TYPE BV1 (29bh)

TYPE PJ1 (1bh)

TYPE P1 (4bh)

TYPE P2 ( 1bh)

TYPE P3 ( 27 bh )

13

Engsel Jendela a.

Type J1 (6 bh)

d. Type J4 (4 bh)

e. Type J5 (12 bh)

f. Type j6 (2 bh)

14

Grendel

15

Raam Skor

16

Pintu Shaft Besi 40/60

17

railing tangga pipa hitam fin. Cat lt 1 ke lt.2

tangga depan

18

railing tralis besi fin. Cat lt canopy

IV

PEKERJAAN PLAFOND

1

Plafond Exose Aci

2

Plafond Asbess Plat

3

List Tepi Kayu Profil

V

Pekerjaan Pasang Lantai dan Dinding

1

Urug Pasir Bawah Lantai

Lantai Rabat Beton Tritisan Volume = t. Lantai Rabat * Luas Lantai Tebal Lantai Rabat = 8 cm

Lebar Lantai Rabat = 120 cm

2

3

Lantai Keramik 20x20 Lavatory

Dinding Keramik 20x25 cm Lavatory 4

Lantai keramik warna 40/40 cm

5

5

Lantai Keramik Warna untuk Tangga 40/40 cm

6

7

Plint Lantai Jeglok Finish Cat Minyak

Batu tempel dinding canopy

8

9

Nosing Tangga

VI

PEK. PENERANGAN :

1

Lampu SL 18 W

2

Down light SL 18 W

3

Lampu baret 40 W

4

Ceiling fan

5

Stop kontak 200 W

6

Saklar tunggal

7

Saklar ganda

VIII

PEK.SANITAIR :

1

Closet jongkok warna tua

2

Saringan air ( floor drain )

3

Kran air

4

Meja pantry + wash bak

5

Bak mandi Fiber + keramik 20/25

6

Kaca cermin 40x60 tepi dibevel

IX

Pekerjaan Cat-catan

Cat Tembok

1

Cat Plafon

2

Cat Pelituran Daun Pintu

3

3

b.

Pekerjaan Finishing Arsitektur Lantai 2

I.

Pekerjaan Pas. Batu Bata/ Plesteran, Beton praktis 1 Pas. Batu Bata 1 : 3

Denah Dua Unit(Ruangan) Hunian

Gambar Rooftank

Gambar letak kusen

2 pas. Batu Bata 1 : 6

Denah Dua Unit (Ruangan) Hunian

Gambar Letak Kusen di Ruangan

Gambar Letak Kusen di Luar Ruangan

Tipe Kusen

Tipe Kolom 3 Plesteran 1 : 3 Plesteran depan

Plesteran belakang

4 Plesteran 1 : 6

5 Plesteran Beton

Keyplan Lantai Kolom Lantai 2 (K1, K3, K4, K4A, dan K5)

Tipe Kolom di Lantai 2 6 Beton Praktis Kolom

7 Beton praktis Balok Latei

II.

Pekerjaan Pasangan Kosen 1 Kosen Aluminium 4'' TYPE J2 (2 bh)

TYPE J3 (2 bh)

TYPE J4 (4 bh)

TYPE J5 (2 bh)

TYPE J6 (2 bh)

TYPE PJ2 (26 bh)

TYPE PJ3 (26 bh)

TYPE BV1 (26 bh)

2 Raam Jendela Aluminium TYPE J3 (2 bh)

TYPE J4 (4 bh)

TYPE J5 (2 bh)

TYPE PJ2 (26 bh)

TYPE PJ3 (26 bh)

TYPE BV1 (26 bh)

3 Kaca Bening 5 mm TYPE J2 (2 bh)

TYPE J3 (2 bh)

TYPE J4 (4 bh)

TYPE J5 (2 bh)

TYPE J6 (2 bh)

TYPE PJ2 (26 bh)

TYPE PJ3 (26 bh)

TYPE BV1 (26 bh)

4 Kunci Tanam Type PJ2 Type PJ3 5 Engsel Pintu Type PJ2 Type PJ3 6 Daun Pintu Double Teakwood TYPE PJ2 (26 bh)

TYPE PJ3 (26 bh)

7 Pintu PVC lengkap kuci, engsel, kusen

8 Sun screen hollow finish cat 9 Engsel jendela Type PJ2 Type PJ3 Type J3 Type J4 Type J5 Type BV1 10 Raam skor III

Pekerjaan Plafond Plafond asbes plat

1

1

List tepi kayu profil

2

IV

Pekerjaan Pasangan Lantai & Dinding

Lantai Keramik 20x20 Lavatory

1

Dinding Keramik 20x25 Lavatory

2

Lantai Keramik 40/40 cm

3

Water Proofing R Lavatory

4

Plint Lantai Jeglok Finish Cat Minyak 5

Volume = 26 x (( 2x 3,45)+(2x 4,35)) + (26x3,60)+ 2 x ((2x1,05) + 5,8 ) = 205,6 + 93,6 + 15,8 = 315 m '

V

PEK. PENERANGAN :

1

Lampu SL 18 W

2

Down light SL 18 W

3

Lampu Baret 40 w

4

Ceiling fan

5

Stop kontak 200 W

6

Saklar tunggal

7

Saklar ganda

VI

PEK.SANITAIR :

1

Closet jongkok warna tua

2

Saringan air ( floor drain )

3

Kran air

5

Kaca cermin 40x60 tepi dibevel

6

Bak mandi Fiber

IX

PEK. CAT-CATAN :

Cat tembok

1

Cat Plafond

2

Pelituran Daun Pintu

3

Cat Listplank Kayu

4

Perhitungan

Volume

Satuan

175.596

m3

94.99



17.59938



L = 1/2(30+80)x80=4400 cm2 volume=4400x360x52=82.368.000 cm3 volume=4400x600x32=79.200.000 cm3 volume=4400x780x2=6.864.000 cm3 volume=4400x200x5=1.760.000 cm3 volume=4400x180x2=1.584.000 cm3 volume=4400x350x2=2.200.000 cm3 total=173.976.000 cm3

LUAS = 1/2(60+30)x60=2700 cm2 volume=2700x600x1=1.620.000 cm3

TOTAL VOLUME=175.596.000 cm3

LUAS=1/2(135+111,6)x20=2466 cm2 volume=2466x600x33=48.826.800 cm3 volume=2466x360x52=46.163.520 cm3

VOLUME TOTAL=94.990.320 cm3

Luas Urug Pasir Bawah Pondasi =1/2(115,5+100)x10=1077,5 cm2 volume=1077,5x

> Luas urug pasir bawah rolag = (0,36 + 0,3) x 0,05 / 2 = 0,0164 m² > Volume urug pasir bawah pondasi = 0,0164 x 144 = 2,368 m³

> Luas urug pasir bawah rolag = (0,36 + 0,3) x 0,05 / 2 = 0,0164 m² > Volume urug pasir bawah pondasi = 0,0164 x 144 = 2,368 m³

764.904



6.3

m2

556.2

m2

1334.02

m2

VOLUME = (luas pasangan rollag bata x jumlah) VOLUME = (30 x 30) x (35 x 2) = 63000 cm2 = 6,3 m2

VOLUME = (jumlah panjang tembok x tinggi tembok - jumlah kolom - jumlah kusen) VOLUME = (15795 x 400) - (648000) (108000) = 5562000 cm2 = 556,2 m2

Dinding Tanpa Trasram = 3,7 x 228,1 =843,97 m2 Keliling = (1,8 + 1,5) x 2 = 6,6 m Tinggi Dinding = 4 – 1,25 = 2,75 m Luas Dinding Kamar Mandi = 6,6 x 2,75 x 27 = 490,05 m2 843,97 + 490,05= 1334,02 m2

1112.4

m2

2668.04

m2

99.6

m2

VOLUME = 2 x jumlah volume ps batu bata 1:3 VOLUME = 2 x 556,2 =1112,4 m2

VOLUME = 2 x jumlah volume ps batu bata 1:6 VOLUME = 2 x 1334,02 m2 = 2668,04 m2

Volume = (b kolom x jumlah kolom x tinggi tembok) 1. Kolom K1 Volume = (35 x 39) = 1400 cm 2. Kolom K1A Volume = (35 x 12) = 420 cm 3. Kolom K2 Volume = (30 x 14) = 420 cm

4. Kolom K3 Volume = (25 x 4) = 100 cm 5. Kolom K4 Volume = (20 x 2) = 40 cm 6. Kolom K4A Volume = (20 x 2) = 40 cm 7. Kolom K5 Volume = (20 x 2) = 40 cm 8. Kolom K6 Volume = (15 x 2) = 30 cm Volume Total = (2490 x 400) = 996000 cm2 = 99,6 m2

21.174

Volume = ( Luas Penampang Sloof xPanjang Sloof ) Panjang sloof S1: Horizontal : 600 + 180 + 600 + 600 = 1980 cm Vertikal

: (2×200) + (31×360) + 220 + 140+ (2×120) + (2×250) + (2×420)

= 13500 cm

m'

Sloof S1 = 1980+13500=15480 cm Panjang sloof S2: = (9×600) + (3×180) + 780 + 605 = 7325 cm Volume = (20 × 40 × 15480) + (20 × 60 × 7325)

= 12384000 + 8790000 = 21174000 cm΄ = 21,174 m΄ 816

m'

274,6

m'

VOLUME = (jmlh kolom praktis x t. lantai) = 204 x 400 = 81600 cm' = 816 m'

Kusen Ruangan (PJ2, PJ3, P3, J5, BV1) [(1,55+1,65+0,8+0,8)x50] + [(1,55+1,65+1,5+0,8+0,8)x2] 252.6

Kusen di Luar Ruang Pengawas (P2, P3, BV1) 0,9+0,8+2,4 4.1

Kusen di Luar Ruangan (P1, J1, J2, J3, J4, PJ1) (0,9+4,8+1,4+5,4+1,6+5,6) 19.7

Volume Beton Praktis Balok Latei 252,6 + 4,1 + 19,7

274,6 m

928.6 VOLUME = (570 x 2)+(60 x 5) = 1440 cm = 14,4 m x 2 = 28,8 m

VOLUME = (170 x 3)+(60 x 4) = 750 cm = 7,5 m x 2 = 15 m

VOLUME = (170 x 2)+(70 x 2) = 480 cm = 4,8 m x 4 = 19,2 m

VOLUME = (170 x 2)+(40 x 2) = 420 cm = 4,2 m x 2 = 8,4 m

m'

VOLUME = (570 x 2)+(100 x 5) = 1640 cm = 16,4 m x 2 = 32,8 m

VOL= (260 x 2)+(80 x 2)+(160 x 1)+(60 x 3) = 1020 cm = 10,2 m x 26 = 265,2 m

VOL = (260 x 2)+(80 x 2)+(160 x 1)+(70 x 3) = 1050 cm = 10,5 m x 26 = 273 m

VOLUME = (60 x 2)+(70 x 2) = 260 cm = 2,6 m x 29 = 75,4 m

VOLUME = (170 x 2)+(50 x 2) = 440 cm = 4,4 m x 2 = 8,8 m

VOL= (270 x6)+(160 x 4)+(550x1)+(210x1) + (210x2)+(160x1) = 3600 cm = 36 m x 1 = 36 m

VOLUME = (210 x 2)+(50 x 2)+ (90 x 3) = 790 cm = 7,9 x 4 = 31,6 m

VOLUME = (205 x 2)+(70 x 1) = 480 cm = 4,8 x 1 = 4,8 m

VOLUME = (200 x 2)+(80 x 1) = 480 cm = 4,8 x 27 = 129,6 m

74.192 VOLUME = ((160 x 60)x2)+((113 x 60)x2)) = 32760 cm2 = 3,276 m2 x 2 = 6,552 m2

VOLUME = ((140 x 40)x2) = 11200 cm2 = 1,12 m2 x 2 = 2,24 m2

VOLUME = 140 x 50 = 7000 cm2 = 0,7 m2 x 4 = 2,8 m2

VOLUME = 140 x 20 = 2800 cm2 = 0,28 m2 x 2 = 0,56 m2

VOLUME = ((160 x 100)x2)+((113 x 100)x2)) = 54600 cm2

m2

= 5,46 m2 x 2 = 10,92 m2

VOLUME = (20 x 60)+(20 x 40)+(85 x 40) = 5400 cm2 = 0,54 m2 x 26 = 14,04 m2

VOLUME = (20 x 60)+(20 x 50)+(85 x 50) = 6450 cm2 = 0,645 m2 x 26 = 16,77 m2

VOLUME = 30 x 50 = 1500 cm2 = 0,15 m2 x 29 = 4,35 m2

VOLUME = (80 x 210) x 4 +(70x80)x4 + (160x40)+ (60x90) x 4 = 100800 cm2 = 10,08 m2 x 1 = 10,08 m2

VOLUME = 140 x 30 = 4200 cm2 = 0,42 m2 x 2 = 0,84 m2

VOLUME = (60 x 90) x 2+ (30 x 60 ) = 12600 cm2 = 1,26 m2 x 4 = 5,04 m2

10.01 VOLUME = ((160 x 5)x2)+((113 x 5)x2)) = 2730 cm2 = 0,2730 m2 x 2 = 0,546 m2

VOLUME = ((140 x 5)x2) = 1400 cm2 = 0,14m2 x 2 = 0,25 m2

VOLUME = 140 x 5 = 7000 cm2 = 0,7 m2 x 4 = 2,8 m2

VOLUME = 140 x 5 = 700 cm2 = 0,07m2 x 2 = 0,14 m2

m2

VOLUME = ((160 x 5)x2)+((113 x 5)x2)) = 2730 cm2 = 0,273 m2 x 2 = 0,546 m2

VOLUME = (20 x 5)+(20 x 5)+(85 x 5) = 625 cm2 = 0,0625 m2 x 26 = 1,625 m2

VOLUME = (20 x 5)+(20 x 5)+(85 x5) = 625 cm2 = 0,0625 m2 x 26 = 1,625 m2

VOLUME = 30 x 5 = 150 cm2 = 0,015 m2 x 29 = 0,435 m2

VOLUME = (80 x 5) x 4 +(70x5)x4 + (160x5)+ (60x5) x 4 = 16400 cm2

= 1,64 m2 x 1 = 1,6m2

VOLUME = 140 x5 = 700 cm2 = 0,07 m2 x 2 = 0,14 m2

VOLUME = (60 x 5) x 2+ (30 x 5 ) = 750 cm2 = 0,075m2 x 4 = 0,3 m2

Pintu = 3, Ventilasi = 2

Pintu = 3, Jendela = 2, Ventilasi = 4

59

bh

4

unit

2

unit

156

bh

Pintu = 3, Jendela = 2, Ventilasi = 4

89.04 VOLUME = (210 x 80) = 16800 cm2 = 1,68 m2 x 26 = 43,68 m2

VOLUME = (210 x 80) = 16800 cm2 = 1,68 m2 x 26 = 43,68 m2

m2

VOLUME = (210 x 80) = 16800 cm2 = 1,68 m2 x 1 = 1,68 m2

27

unit

2

unit

177.4

m2

920

m'

volume = (200*1650)*26 = 85,8 m2 volum3=(200*82,5)*56 = 92,4

VOLUME = (160 x 4)+(40 x 4) = 800 cm = 8,0 m x 2 = 16 m

VOLUME = (160 x 2)+(50 x 2) = 420 cm = 4,2 m x 4 = 16,8 m

VOLUME = (160 x 2)+(20 x 2) = 360 cm = 3,6 m x 2 = 7,2 m

VOLUME = (210 x 2)+(60 x 4)+(40 x 4)+ (40 x 4)+(105x2) = 1190 cm = 11,9 m x 26 = 309,4 m

VOLUME = (210 x 2)+(60 x 4)+(40 x 4)+ (50 x 4)+(105x2) = 1230 cm = 12,3 m x 26 = 319,8 m

VOLUME = (50 x 2)+(70 x 2) = 240 cm = 2,4 m x 29 = 69,6 m VOLUME = (160 x 2) + (30x2) = 380 cm = 3,8 m x 2 = 7,2 m

VOLUME = (120 x 3) + (210x4) = 1200 m = 12 m x 1 = 12 m

VOLUME = (210x 2) + (60x5) + (50 x 2) = 820 cm =8,2 m x 4 = 32,8 m

VOLUME = (210 x 2) + (60x2) = 540 cm = 5,4 x 1 = 5,4 m

VOLUME = (200x 2) + (50x2) = 500 cm = 5,0 x 27 = 135 m

86

bh

12

bh

8

24

bh

16

bh

109

bh

109

bh

2

bh

225.63

m'

41

m'

135.65

m2

614.24

m2

909

m'

Volume = t. urug pasir x Luas Lantai Tebal urug pasir = 10 cm

Volume 1 = (870*120)*2*8 = 1670400 cm³ Volume 2 = (80*120)*4*8 = 307200 cm³

79.68

m3

Volume 3 = (270*120)*2*8 = 518400 cm³ Volume 4 = (720*120)*2*8 = 1382400 cm³ Volume 5 = (1910*120)*2*8 = 3667200 cm³ Volume 6 = (2640*120)*2*8 = 5068800 cm³

17.83



78.39

m2

188.96



660.625



Volume 7 = (600*120)*2*8 = 1152000 cm³ Volume 8 = (835*120)*2*8 = 1603200 cm³ Volume 9 = (560*120*2*8 = 1075200 cm³ Volume 10 = (300*120)*2*8 = 576000 cm³ Volume 11 = (840*120)*8 = 806400 cm³ Total = 17827200 cm³ = 17,83 m³ Tipe A = 195*150*26 = 760500 cm² Tipe B = 180*130*1 = 23400 cm²

Tipe A = 160*440*26 = 1830400 cm² Tipe B = 160*370*1 = 59200 cm² Volume = 1830400+59200 = 1889600 cm²

660.625



29.8



558.7

m

Tipe A = 2*69057.5 = 138115 cm²

Tipe B = 2*79956.25 = 159912.5 cm² Volume = 29800 cm²

35100 Tipe B = 270*26 = 7020 cm Tipe C = 227.5*2 = 455 cm Tipe D = 1390*2 = 2780 cm Tipe E = 835*2 = 1670 cm Tipe F = 1530*1 = 1530 cm Tipe G = 690*1 = 690 cm Tipe H = 4285*1 = 4285 cm Volume = 55870 cm

Tipe B= 22*80 = 1760 cm

20.39



34.38

m

106

bh

67

bh

2

bh

27

bh

56

bh

28

bh

53

bh

27

bh

27

bh

53

bh

4

bh

27

bh

27

bh

Tipe A = (76.3*11)+(76.2*11)

= 1677.5 cm Volume = 3437.5 cm

a. Dinding Luar

Keliling = 18230 cm Luas = 18230 x tinggi gedung = 18230 x 400 = 7292000 cm2 b. Dinding Dalam Keliling = 100685 cm Luas = 100685 x 325 = 32722625 cm2 Total Cat luar dalam 7292000 + 32722625 = 38647375 cm2 Bagian tangga yang di cat = 300465 cm2 Bag dinding yg tidak terkena cat = 83848 cm2 Area Tangga = 300465 – 83848 = 216617 cm2 c. Bagian tidak terkena cat (luar & dalam) 1. Jendela BV1 = 80 x 60 x 29 = 139200 cm2 (29 buah) 2. Pintu+jendela = 260 x 90 x 26 = 609400 cm2

(PJ2) 31 buah

= 160 x 65 x 26 = 270400 cm2

3. Pintu+jendela = 260 x 90 x 26 = 609400 cm2 (PJ3) 26 buah

= 160 x 75 x 26 = 312000 cm2

4. pintu P3 = (80x205) x 27 (27 buah) = 442800 cm2 5. pintu P1 = 215 x 90 x 4 = 77400 = 60 x 90 x 4 = 21600 6. pintu P2 = (90 x 215) (1 buah) = 19350 cm2 Total luasan pintu = 2499550 cm2 7. PJ1 = ((175 x 5 x)x 2) + (160 x 5) = 2550 cm2 8. jendela J1 = (60x160) (6 buah) = 9600 x 6 = 57600 cm2 9. jendela J2 = (70x570) (2 buah) = 39900 x 2= 79800 cm2

2047.948

m2

10. jendela J3 = (135x170) (4 buah) = 22950 x 4 = 91800 cm2 11. jendela J4 = (80x170) (2 buah) = 13600 x 2 = 27200 cm2 12. jendela J5 = (50x170) (6 buah) = 8500 x 6 = 51000 cm2 13. jendela J6 = (110x273) (lt 1) = 30030 x 2 = 60060 cm2 14. Ventilasi Jemuran = (250 x 152,5) (26 buah) = 38125 x 26 = 991250 cm2 TOTAL (luar & dalam) = 4168260 cm2 x 2 = 8336520 cm2 TOTAL CAT TEMBOK = 28816000 - 8336520 = 20479480 cm2 = 2047.948 m2

1. Tiap Kamar = (600 - (2x15)) x (360 - (2x15)) (26 kamar) = 188100 x 26 = 4890600 cm2 2. Koridor = (180x360x7) + (600x360450x200)+(600x120) (kanan kiri) = 651600 x 2 = 1303200 cm2

706.38

m2

90.72

m2

3. Gedung Tengah = (350x360) x 2 = 252000 cm2 = (250x600) + (360x600) + (420x600) = 618000 cm2 TOTAL CAT PLAFOND = 4890600 + 1303200 + 252000 + 618000 = 7063800 cm2 = 706.38 m2

Luasan Daun Pintu : 210 cm x 80 cm = 16.800 cm2 Jumlah Daun Pintu : 27 buah

90.72

m2

208.68



Luasan Pelituran Daun Pintu : 2 x 27 x 16800 cm2 = 907200 cm2

Luas Bruto = (Panjang kotor (pas. batu bata 1:3)*tinggi ruangan *banyak ruangan) + (4*Sisi Rooftank*tinggi) = ([1,8*2+1,5*2]*1,5*26) + (4*3,6*2) = 257,4 + 28,8 = 286,2 m²

Detail Kusen dan Kolom

Luas Pengurangan = Luas Kusen Type P3 + Luas Kusen Type BV1 + Luas 1/2B kolom*tinggi*jumlah sisi kolom = (0,8*2,05) + (0,8*15,6) + (0,175*4*32) = 42,64 + 12,48 + 22,4 = 77,52 m² Jadi, Luas Pas. Batu Bata 1:3 = 286,2 - 77,52 = 208,68 m²

1348.71 Luas Bruto = (Panjang kotor (pas. batu bata 1:6)*tinggi ruangan = (Total Panjang dinding di ruangan*tinggi) + (Total Panjang dinding di luar ruangan) + (panjang ruangan kamar mandi*tinggi ruangan*banyak ruangan) = (249,6*4) + (39,6*4) + ([1,8*2+1,5*2]*2,5*26) = 1585,80 m²

Luas Pengurangan = Luas Kusen Type (PJ2,PJ3,J2,J3,J4,J5,&J6) + Luas 1/2B kolom*tinggi*jumlah sisi kolom (K1,K4,K4A,K5)

= ([1,35*1,7]+[1,65*2,6]+[0,7*2,26]+[1,35* 0,7]+[0,8*1,7]+[0,5*1,7]+[1,1*2,26]) + ([0,175*4*34]+[0,3*4*2]+[0,3*4*2]+ [0,35*4*2]) = 237,0908 m² Jadi, Luas Pas. Batu Bata 1 : 6 = 1585,8- 237,0908 = 1348,71 m²



pan

417.36



2697.42



225.6

m

Luas Plesteran 1 : 3 = 2*Luas Pas. Batu Bata 1 : 3 = 2*208,68 = 417,36 m²

ran belakang

Luas Plesteran 1 : 6 = 2*Luas Pas. Batu Bata 1 : 6 = 2*1348,71 = 2697,42 m²

Luas Bruto Selimut Kolom (K1, K3, K4, K4A, dan K5) = Luas( K1+ K3 + K4 + K4A + K5) = (0,35*4*4)*32 + (0,4*4+0,25*4)*2 + (0,4*4+0,2*4)*2 + (0,4*4+0,2*4)*2 + (0,5*4+0,2*4)*2

= 264 m²

Luas Pengurangan Akibat Ada Dinding = Lebar dinding*tinggi*n = 0,15*4*64 = 38,4 m² Jadi, Luas Plesteran Beton = 264 - 38,4 = 225,6 m²

344

m

259,3

m

Panjang Kolom Praktis = Jumlah Kolom praktis dilantai 2*tinggi = 88*4 = 344 m

Tipe Kusen yang Ada di Lantai 2 : PJ2, PJ3, J2, J3, J4, J5 ,J6, P3, BV1

Kusen Ruangan (PJ2, PJ3, P3, J5, BV1) [(1,55+1,65+0,8+0,8)x50] + [(1,55+1,65+1,5+0,8+0,8)x2] 252.6

Kusen di Luar Ruangan (J2,J3,J4,J6) (0,7+3,3+1,6+1,1) 6.7

Total Lebar Kusen = 252,6 + 6,7 = 259,3 m

710.00 VOLUME = (570 x 2)+(60 x 5) = 1440 cm = 14,40 m x 2 = 28,80 m

VOLUME = (170 x 3)+(60 x 4) = 750 cm = 7,5 m x 2 = 15 m

m'

VOLUME = (170 x 2)+(70 x 2) = 480 cm = 4,80 m x 4 = 19,2 m

VOLUME = (170 x 2)+(40 x 2) = 420 cm = 4,2 m x 2 = 8,4 m

VOLUME = (570 x 2)+(100 x 5) = 1640 cm = 16,4 m x 2 = 32,8 m

VOLUME = (260 x 2)+(80 x 2)+(160 x 1)+(60 x 3) = 1020 cm = 10,2 m x 26 = 265,2 m

VOLUME = (260 x 2)+(80 x 2)+(160 x 1)+(70 x 3) = 1050 cm = 10,5 m x 26 = 273 m

VOLUME = (60 x 2)+(70 x 2) = 260 cm = 2,6 m x 26 = 67,6 m

517.20 VOLUME = (160 x 4)+(60 x 4) = 880 cm = 8,8 m x 2 = 17,6 m

VOLUME = (160 x 2)+(70 x 2) = 460 cm = 4,6 m x 4 = 18,4 m

VOLUME = (160 x 2)+(40 x 2) = 400 cm =4mx2 =8m

VOLUME = (40 x 4)+(105 x 2)+(80 x 2)+(60 x 4) = 770 cm = 7,7 m x 26 = 200,2 m

VOLUME = (40 x 4)+(105 x 2)+(80 x 2)+(70 x 4) = 810 cm = 8,1 m x 26 = 210,6 m

m'

VOLUME = (50 x 2)+(70 x 2) = 240 cm = 2,4 m x 26 = 62,4 m

101.882 VOLUME = ((160 x 60)x2)+((113 x 60)x2)) = 32760 cm2 = 3,276 m2 x 2 = 6,552 m2

VOLUME = ((160 x 60)x2) = 19200 cm2 = 1,92 m2 x 2 = 3,84 m2

VOLUME = 160 x 70 = 11200 cm2 = 1,12 m2 x 4 = 4,48 m2

m2

VOLUME = 160 x 40 = 6400 cm2 = 0,64 m2 x 2 = 1,28 m2

VOLUME = ((160 x 100)x2)+((113 x 100)x2)) = 54600 cm2 = 5,46 m2 x 2 = 10,92 m2

VOLUME = (40 x 80)+(40 x 60)+(105 x 60) = 11900 cm2 = 1,19 m2 x 26 = 30,94 m2

VOLUME = (40 x 80)+(40 x 70)+(105 x 70) = 13350 cm2 = 1,335 m2 x 26 = 34,71 m2

`

VOLUME = 50 x 70 = 3500 cm2 = 0,35 m2 x 26 = 9,1 m2

52

bh

104

bh

27.84

m2

(1 X 26) = 26 (1 X 26) = 26

(2 X 26) = 52 (2 X 26) = 52

Daun Pintu Double Taekwood (Type P2, PJ2, PJ3)

Luas = 120 x 80 = 9600 cm2 Jumlah = 29 Total Luas = 29 x 9600 = 278400 cm 2

26

unit

25.48

m2

384

bh

18

bh

665.57

m2

(2 x 3) x 26 = 156 (2 x 3) x 26 = 156 (2 x 2) x 2 = 8 (2 x 1) x 4 = 8 (2 x 1) x 2 = 4 (2 x 1) x 26 = 52

Volume

665.57

m2

866.95

m'

58.44

m2

= 26 x (155 x 145 ) cm² = 26 x 22475 cm² = 584350 cm² = 58,435 m²

Volume

= 26 x (( 2x 1,6 x 1,45) +( 2 x 1,6 x1,55)) m² = 26 x( 4,640 + 4,96) m² = 249,6 m²

249.6

m2

511.86

m2

249.6

m2

= ( 26 x ( 3,60 x 4,45 )) + (14 x 1,65 x 3,60) + (2 x 1,05 x 5,8 ) m² = 359,125,195+75,075+12,18m² = 511,86 m²

= 26 x ((2 x 1,6m x 1,55 m) + (2 x1,6m x 1,45m)) = 26 x (3,565 + 3,335 )m² = 249,6 m²

26x3,60)+ 2 x ((2x1,05) + 5,8 )

315

m

104

bh

54

bh

0

bh

26

bh

54

bh

24

bh

52

bh

26

bh

26

bh

52

bh

26

bh

26

bh

2978.4

m2

a. Dinding Luar Keliling = 16480 cm Luas = 16480 x tinggi gedung = 16480 x 400 = 6592000 cm2 b. Dinding Dalam Keliling = 71360 cm Luas = 71360 x 325 = 23192000 cm2 Total Cat luar dalam 6592000 + 23192000 = 29784000 cm2

c. Bagian tidak terkena cat (luar & dalam)

1. Jendela BV1 = 80 x 60 x 26 = 124800 cm2

(26 buah) 2. Pintu+jendela = 260 x 90 x 26 = 609400 cm2 (PJ2) 31 buah

= 160 x 65 x 26 = 270400 cm2

3. Pintu+jendela = 260 x 90 x 26 = 609400 cm2 (PJ3) 26 buah

= 160 x 75 x 26 = 312000 cm2

4. pintu P3 = (80x205) x 27 (26 buah) = 426400 cm2

1. Tiap Kamar = (600 - (2x15)) x (360 - (2x15)) (26 kamar) = 188100 x 26 = 4890600 cm2 2. Koridor = (180x360x7) + (600x360)+(200x180)+((20015)x(450-30)

(kanan kiri) = 783300 x 2 = 1566600 cm2 3. Gedung Tengah = (350x360) x 2 = 252000 cm2

706.38

m2

87.36

m2

67.68

m2

= (250x600) + (360x600) + (420x600) = 618000 cm2 TOTAL CAT PLAFOND = 4890600 + 1303200 + 252000 + 618000 = 7063800 cm2 = 706.38 m2

Luasan Daun Pintu : 210 cm x 80 cm = 16.800 cm2 Jumlah Daun Pintu : 26 buah Luasan Pelituran Daun Pintu : 2 x 26 x 16800 cm2 = 873600 m2

Lebar Trekstang : 120 cm Lebar Listplank : 30 cm Keliling Listplank Kayu : 22560 cm Luasan Listplank Kayu : 0.3 m x 22560 cm = 676800 cm2

D

Pekerjaan Halaman Dan Bangunan Penunjang

I

Pekerjaan Saluran Saluran Terbuka U 20

1

Saluran buis beton φ 20

2

Bak kontrol 45x45

3

II

Septictank + Peresapan (8 unit) Galian Tanah

Perhitungan

> Luas Galian A. = (3.6x1.95) + (2.58x0.65) + (2.52x0.38) B. =(1.8x(2.06+0.08+0.2+0.1)) Resapan C. = 4x1,2 1

D. = 0.9x1.2 > Volume = (9.655x1.8) + (4.392x2.1) + (4.8x1.2) + (1.08x4)

Urugan Tanah Kembali > Luas Urugan Tanah A. =((3.6-0.4)x0.75) B. = 1.8X0.75 Resapan 2

C. = 4x0.1 D. = 1.2x0.1 > Volume (2.4x1.8)+(1.35x3.6)+(0.4x1.2)+(0.1 2x4)

Urugan Pasir

> Luas Urugan = 2.5x0.08 = 1.8x0.1 Resapan = 4x0.15

3 = 0.8x0.15 > Volume (0.2x1.8)+(0.18x3.6)+(0.6x1.2)+(0.1 2x4)

Volume Aanstamping Potongan A > Luas anstamping A. = 2x(0.75𝑥0.3/2) = 0.95x0.15 = 1.3x0.15 = 1.8x0.3 > Volume (2.25x30)+(1.425x90)+ (1.95x0.9)+(5.4x1.8)

4 Potongan B

>Luas anstamping = 0.2x1.8 >Volume = 0.36x1.5 >Total 1 unit = 1.343+0.54 >Total 8 unit = 1.883x8

Volume Beton Potongan A Pelat Penutup > Luas Beton = 2x(0.075+0.6+0.3+ 0.4)x0.1 + (2x0.75x0.1) + (0.4x0.1) >Volume = 0.465x1.8 Pelat Dasar > Luas Beton = 0.08x2.1 > Volume = (0.168x1.8) Potongan B 5

Pelat Penutup >Luas Beton = 1.5x0.1 >Volume = 0.15x1.5 Pelat Dasar >Luas Beton = 0.08x1.8 >Volume =0.144x1.5 >Total 1 unit = 0.837+0.302+0.225 +0.216 >Total 8 unit = 1.58x8 Dinding Bata 1:3 1. 2 x 60 x 30 2. 2 x 70 x 15

6

3. 2 x 94,87 x 21,21

6

4. 100 x 30 5. 65 x 30 Total Total 8 unit Plasteran 1:3 V = 2 x V.Dinding Bata

7 V = 2 x 117395,08

Pipa hawa Ø 1,5" GIP Untuk 8 buah

8 Jumlah = 1x8

Pipa PVC Ø4" 1 unit = 400 cm + 150 cm + 1 cm 8 unit = 8 x 650 cm

9

Ukuran dipasaran 4m Jumlah Total Pipa

Ijuk >Panjang Pipa = √(4²+0,5²) 10

>Lp Ijuk = π x 0,1016*4,031

10

+ ¹/₄π x 0,1016² Kerikil + Batu Pecah

>Volume = ¹/₂(0,45+0,775)x0,65 - ¹/₄π x0,1016²x4,031

11

0.365

12

Sirtu

Volume

Satuan

171.45

m'

2.073

m'

33

bh

9655

4,392 m2

4800

1080

36,682

m3

2.4 1.35 m2 0.4 0.12

10.14

m3

= 0.200 m2 = 0.18 m2 = 0.6 m2 m3 = 0.12 m2

2.208

= 2.25 = 1.425

m2

= 1.95 = 5.4

= 1.343

m3

= 0.36

m2

= 0.54

m3

= 1.883 = 15.064

m3

= 0.465

m2

0.837

m3

= 0.168

m2

0.302

m3

= 0.15

m2

0.225

m3

0.144

m2

0.216

m3

1.58

m3

12.64

m3 3600 2100 m2

4024.39 3000

m2

1950 14674.3854 117395.08

234790.1664

m2

8

bh

650 cm

5200 5200/400 13

4,031

Bh

m

1.295

m2

0.365

m3

4.8

m3

No.

SNI

KODE

KOEF

SAT.

A 1

HARGA BAHAN/UPAH Rp

HARGA SATUAN PEKERJAAN PERSIAPAN A.2.2.1.9

1

m2 A

2

URAIAN PAKERJAAN

Pembersihan Lapangan TENAGA

L.01

0.1

OH

Pekerja

75000

L.04

0.05

OH

Mandor

100000

B

BAHAN

C

PERALATAN

D

Jumlah A+B+C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m’

Pengukuran dan Bouwplank

A

TENAGA

A.2.2.1.4

1

L.01

0.1

OH

Pekerja

75000

L.02

0.1

OH

Tukang Kayu

95000

L.03

0.01

OH

Kepala Tukang

110000

L.04

0.005

OH

Mandor

100000

B

BAHAN

0.012

m3

Kayu 5/7x 4m Kayu Kruing

0.02

kg

Paku Biasa 2”-5”

0.007

m3

Kayu Papan 3/20 Kruing

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

5051000 15000 6250000

3

LS

1

ls

Penyediaan Listrik & Air Kerja

4

LS

1

ls

Papan Nama Proyek

1000000

5

LS

1

ls

Administrasi Proyek

2200000

B

13750000

HARGA SATUAN PEKERJAAN STRUKTUR DAN ATAP

I

PEKERJAAN TANAH

1

A.2.3.1.3

Menggali Tanah Biasa Sedalam 3 m

1

m3

L.01

1.05

OH

Pekerja

75000

L.04

0.067

OH

Mandor

100000

B

BAHAN

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A

TENAGA

2

A.2.3.1.9

1

m3

A

II 1

0.5

OH

Pekerja

75000

L.04

0.05

OH

Mandor

100000

B

BAHAN

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

PEKERJAAN BETON BERTULANG A.2.3.1.14

1

m3

0.25

OH

Pekerja

75000

0.025

OH

Mandor

100000

B

BAHAN

1.2

m3

A.4.1.1.4

1

TENAGA

Sirtu PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%) Harga Satuan Pekerjaan (D+E)

m3 A

A.4.1.1.17

Mengurug Sirtu Padat

C

F

3

TENAGA

L.01

A

2

Pengurugan Kembali dihitung dari 1/3 kali koefisien Pekerjaan galian

180000

Lantai Kerja 1:3:5 bwh Poor/Sloof t=5 cm TENAGA

L.01

1.2

OH

Pekerja

75000

L.02

0.2

OH

Tukang Batu

95000

L.03

0.02

OH

Kepala Tukang

110000

L.04

0.006

OH

Mandor

100000

B

BAHAN

230

kg

Portland Semen

1050

893

kg

250

1027

kg

200

ltr

Pasir Beton Kerikil (maksimum 30mm) Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

kg

Pembesian dg Besi Polos

A

TENAGA

10

229.63 15

3

L.01

0.07

OH

Pekerja

75000

L.02

0.07

OH

Tukang Besi

95000

L.03

0.007

OH

Kepala Tukang

110000

L.04

0.004

OH

Mandor

100000

B

BAHAN

10.5

Kg

Besi Beton polos

9800

0.15

Kg

Kawat Beton

17000

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

kg

Pembesian dg Besi Ulir

A

TENAGA

A.4.1.1.17

10

L.01

4

0.007

OH

Pekerja

L.02

0.07

OH

Tukang Besi

95000

L.03

0.007

OH

Kepala Tukang

110000

L.04

0.004

OH

Mandor

100000

B

BAHAN

1.5

Kg

Besi Beton ulir

9800

0.15

Kg

Kawat Beton

17000

C

PERALATAN

D

Jumlah A + B + C

F

Overhead & Profit (10%)

G

Harga Satuan Pekerjaan (D+E)

A.4.1.1.20

1

m2 A

75000

Memasang Bekisting untuk Pondasi TENAGA

L.01

0.52

OH

Pekerja

75000

L.02

0.26

OH

Tukang Kayu

95000

L.03

0.026

OH

Kepala Tukang

110000

L.04

0.026

OH

Mandor

100000

B

BAHAN

0.04

m3

Kayu Klas III (Terentang)

2000000

0.3

Kg

Paku Biasa 2" - 5"

15000

0.1

Ltr

Minyak Bekisting

9000

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

5

A.4.1.1.21

1

m2 A

L.01

6

TENAGA

0.52

OH

Pekerja

L.02

0.26

OH

Tukang Kayu

95000

L.03

0.026

OH

Kepala Tukang

110000

L.04

0.026

OH

Mandor

100000

B

BAHAN

A.4.1.1.22

75000

0.045

m3

Kayu Klas III (Terentang)

0.3

Kg

Paku Biasa 2" - 5"

15000

0.1

Ltr

Minyak Bekisting

9000

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2 A

7

Memasang Bekisting untuk Sloof

2000000

Memasang Bekisting untuk Kolom TENAGA

L.01

0.66

OH

Pekerja

75000

L.02

0.33

OH

Tukang Kayu

95000

L.03

0.033

OH

Kepala Tukang

110000

L.04

0.033

OH

Mandor

100000

B

BAHAN

A.4.1.1.23

0.04

m3

Kayu Klas III (Terentang)

0.4

Kg

Paku Biasa 2" - 5"

2000000 15000

0.2

Ltr

Minyak Bekisting

9000

0.015

m3

Balok Kayu Klas II

5051000

0.35

Lbr

Plywood tebal 9mm

121000

2

Btg

Dolken Kayu Galam diameter 8 - 10 cm / 4 m

21000

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m2 A

Memasang Bekisting untuk Balok TENAGA

L.01

0.66

OH

Pekerja

75000

L.02

0.33

OH

Tukang Kayu

95000

L.03

0.033

OH

Kepala Tukang

110000

L.04

8

A.4.1.1.24

0.033

OH

Mandor

B

BAHAN

0.04

m3

Kayu Klas III (Terentang)

0.4

Kg

Paku Biasa 2" - 5"

15000

0.2

Ltr

Minyak Bekisting

9000

0.018

m3

Balok Kayu Klas II

5051000

0.35

Lbr

Plywood tebal 9mm

121000

2

Btg

Dolken Kayu Galam diameter 8 - 10 cm / 4 m

21000

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m2 A

9

100000

2000000

Memasang Bekisting untuk Lantai TENAGA

L.01

0.66

OH

Pekerja

75000

L.02

0.33

OH

Tukang Kayu

95000

L.03

0.033

OH

Kepala Tukang

110000

L.04

0.033

OH

Mandor

100000

B

BAHAN

A.4.1.1.26

0.04

m3

Kayu Klas III (Terentang)

0.4

Kg

Paku Biasa 2" - 5"

15000

0.2

Ltr

Minyak Bekisting

9000

0.015

m3

Balok Kayu Klas II (Borneo)

5051000

0.35

Lbr

Plywood tebal 9mm

121000

6

Btg

Dolken Kayu Galam diameter 8 - 10 cm / 4 m

21000

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m2 A

2000000

Memasang Bekisting untuk Tangga TENAGA

L.01

0.66

OH

Pekerja

75000

L.02

0.33

OH

Tukang Kayu

95000

L.03

0.033

OH

Kepala Tukang

110000

L.04

0.033

OH

Mandor

100000

B

BAHAN

0.03

m3

Kayu Klas III (Terentang)

0.4

Kg

Paku Biasa 2" - 5"

15000

0.15

Ltr

Minyak Bekisting

9000

0.015

m3

Balok Kayu Klas II

5051000

0.35

Lbr

Plywood tebal 9mm

121000

2000000

2

10

A.4.1.1.8

1

Btg C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m3

A

11

Dolken Kayu Galam diameter 8 - 10 cm / 4 m

21000

Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 TENAGA

L.01

1.65

OH

Pekerja

75000

L.02

0.275

OH

Tukang Batu

95000

L.03

0.028

OH

Kepala Tukang

110000

L.04

0.083

OH

Mandor

100000

B

BAHAN

384

Kg

Portland Semen

1050

692

Kg

250

1039

Kg

215

ltr

Pasir Beton Kerikil (maksimum 30 mm) Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.1.1.29

1

m3 A

229,63 15.00

Beton Balok Ring Atas TENAGA

L.01

0.297

OH

Pekerja

75000

L.02

0.033

OH

Tukang Batu

95000

L.02

0.033

OH

Tukang Kayu

95000

L.02

0.033

OH

Tukang Besi

95000

L.03

0.01

OH

Kepala Tukang

110000

L.04

0.015

OH

Mandor

100000

B

BAHAN

0.003

m3

Kayu Klas III

0.02

kg

Paku Biasa 2"-5"

3290000 15000

3.6

kg

Besi Beton Polos

9800

0.05

kg

Kawat Beton

17000

5.5

kg

Portland Semen

1050

0.009

m3

Pasir Beton

350000

0.015

m3

Kerikil

330000

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

12

A.4.7.1.10

1

m2 A

TENAGA

L.01

0.02

OH

Pekerja

75000

L.04

0.003

OH

Mandor

100000

B

BAHAN

kg

Cat pelapis anti bocor

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

0.2

III

PEKERJAAN RANGKA ATAP DAN ATAP

1

A.4.6.1.13a

1

m2

(Bikinan)

2

Water Proofing Daak

A

110000

Pembuatan & Memasang K TENAGA

L.01

0.2

OH

Pekerja

75000

L.02

0.45

OH

Tukang Besi

95000

L.03

0.01

OH

Kepala Tukang

110000

L.04

0.05

OH

Mandor

100000

B

BAHAN

1,488

m’

C-75, 0.8

14500

2,232

m’

C-75, 0.6

12500

28

bh

Baut (Screw driver)

1.6

bh

Dynabolt

3500

5.4

m’

Reng

7000

0.124

m’

Talang Jurai

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.5.2.2

1

m2 A

350

48000

Pemasangan Atap Genteng Glasur TENAGA

L.01

0.15

OH

Pekerja

L.02

0.075

OH

Tukang Kayu

95000

L.03

0.008

OH

Kepala Tukang

110000

L.04

0.008

OH

Mandor

100000

B

BAHAN

25

Buah

Genteng Glasur

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

75000

4250

F

3

A.4.5.2.5

1

m2 A

4

Pemasangan Genteng Bubung Glasur TENAGA

L.01

0.4

OH

Pekerja

75000

L.02

0.2

OH

Tukang Kayu

95000

L.03

0.02

OH

Kepala Tukang

110000

L.04

0.002

OH

Mandor

100000

B

BAHAN

A.4.4.1.8a

5

Buah

8 0.032

1

Genteng Bubung Glasur

6500

kg

Portland Semen

1050

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m2

(Bikinan)

A

315000

Ornamen Puncak Atap TENAGA

L.01

0.3

OH

Pekerja

75000

L.04

0.015

OH

Mandor

100000

B

BAHAN

1

5

Harga Satuan Pekerjaan (D+E)

A.5.1.1.31

1

L.01

Buah

Ornamen Puncak Atap

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa PVC tipe AW Ø 3"

A

TENAGA

8250

0.081

OH

Pekerja

75000

L.02

0.135

OH

Tukang Batu

95000

L.03

0.0135

OH

Kepala Tukang

110000

L.04

0.004

OH

Mandor

100000

B

BAHAN

1.2

m'

Pipa PVC Ø 3"

20833,33

0.35

Ls

Perlengkapan 35% x pipa

20833,33

C

PERALATAN

6

7

A.4.5.2.37

1

1

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Nok Genteng Metal

A

TENAGA

L.01

0.25

OH

Pekerja

75000

L.02

0.15

OH

Tukang Kayu

95000

L.03

0.015

OH

Kepala Tukang

110000

L.04

0.013

OH

Mandor

100000

B

BAHAN

A.4.6.1.21

1.1

Buah

0.05

1

Nok Genteng

20000

Kg

Paku Biasa 1/2" - 1"

15000

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Listplank Kayu Bengkirai 2x2/20

A

TENAGA

L.01

0.1

OH

Pekerja

75000

L.02

0.2

OH

Tukang Kayu

95000

L.03

0.02

OH

Kepala Tukang

110000

L.04

0.005

OH

Mandor

100000

B

BAHAN

C I

D

0.0108

m3

Kayu bengkirai

0.10

Kg

Paku Biasa 2" - 5"

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

9750000 13000

HARGA SATUAN PEKERJAAN FINISHING ARSITEKTUR PEKERJAAN PONDASI BATU BELAH A.3.2.1.4

1

m3 A

Pemasangan Pondasi Batu Belah 1SP : 6PP TENAGA

L.01

1.5

OH

Pekerja

75000

L.02

0.75

OH

Tukang Batu

95000

L.03

0.075

OH

Kepala Tukang

110000

L.04

0.075

OH

Mandor

100000

B

BAHAN

1.2

m3

Batu Belah 15/20

260000

2

A.3.2.1.9

117

kg

Portland Semen

0.561

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

1

m3 A

3

Pemasangan Batu Kosong/Anstamping TENAGA

L.01

0.78

OH

Pekerja

75000

L.02

0.39

OH

Tukang Batu

95000

L.03

0.039

OH

Kepala Tukang

110000

L.04

0.039

OH

Mandor

100000

B

BAHAN

A.2.3.1.11

1.2

m3

Batu Belah 15/20

260000

0.432

m3

Pasir Urug

160000

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m3 A

II

1050 315000

Urugan Pasir TENAGA

L.01

0.3

OH

Pekerja

75000

L.04

0.01

OH

Mandor

100000

B

BAHAN

1.2

m3

Pasir Urug

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

PEKERJAAN PASANGAN BATU BATA/PLESTERAN

160000

1

A.4.4.1.2

1

m2 A 0.6

OH

Pekerja

75000

L.02

0.2

OH

Tukang Batu

95000

L.03

0.02

OH

Kepala Tukang Batu

110000

L.04

0.03

OH

Mandor

100000

B

BAHAN

A.4.4.1.8

Bata Merah

580

32.95

Kg

Portland Semen (PC)

1050

0.091

m3

Pasir Pasang (PP)

1

Buah

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m2

A

315000

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP TENAGA

L.01

0.3

OH

Pekerja

75000

L.02

0.1

OH

Tukang Batu

95000

L.03

0.01

OH

Kepala Tukang

110000

L.04

0.015

OH

Mandor

100000

B

BAHAN

70

3

TENAGA

L.01

140

2

Pasangan Rollag 1:3

A.4.4.1.11

Buah

580 1050

14.37

Kg

Portland Semen

0.04

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2

A L.01

Bata Merah 5 x 11 x 22

315000

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP TENAGA

0.3

OH

Pekerja

L.02

0.1

OH

Tukang Batu

95000

L.03

0.01

OH

Kepala Tukang

110000

L.04

0.015

OH

Mandor

100000

B

BAHAN

70

Buah

75000

Bata Merah 5 x 11 x 22

580 1050

8.32

Kg

Portland Semen

0.049

m3

Pasir Pasang

C

PERALATAN

315000

4

A.4.4.2.3

1

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m2

A

5

1

TENAGA

L.01

0.3

OH

Pekerja

75000

L.02

0.15

OH

Tukang Batu

95000

L.03

0.015

OH

Kepala Tukang

110000

L.04

0.015

OH

Mandor

100000

B

BAHAN

7,776

Kg

Portland Semen

0.023

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.4.2.6

1

m2

A

III

Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm

1050 315000

Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm

TENAGA

L.01

0.3

OH

Pekerja

75000

L.02

0.15

OH

Tukang Batu

95000

L.03

0.015

OH

Kepala Tukang

110000

L.04

0.015

OH

Mandor

100000

B

BAHAN

4,416

Kg

Portland Semen

0.027

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Kosen Aluminium 4"

A

TENAGA

1050 315000

PEKERJAAN PASANGAN KOSEN A.4.2.1.11

1

L.01

0.043

OH

Pekerja

75000

L.02

0.043

OH

Tukang Besi

95000

L.03

0.0043

OH

Kepala Tukang

110000

L.04

2

A.4.6.2.17

0.0021

OH

Mandor

B

BAHAN

1.1

m'

Profil Aluminium

2

Buah

Skrup Fixer

0.06

Tube

Sealent

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m2 A

750 50000

Pemasangan Kaca Tebal 5 mm TENAGA

0.015

OH

Pekerja

75000

L.02

0.15

OH

Tukang Kayu

95000

L.03

0.015

OH

Kepala Tukang

110000

L.04

0.00075

OH

Mandor

100000

B

BAHAN

A.4.6.2.2

1

m2

Kaca Tebal 5 mm

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

Buah A

90000

Pemasangan Kunci Tanam TENAGA

L.01

0.01

OH

Pekerja

75000

L.02

0.5

OH

Tukang Kayu

95000

L.03

0.01

OH

Kepala Tukang

110000

L.04

0.005

OH

Mandor

100000

B

BAHAN

1

5

80000

L.01

1.1

4

100000

A.4.6.2.2a

1

Buah

Kunci Tanam

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

Unit

(bikinan)

A

110000

Pemasangan Floor Hinges TENAGA

L.01

0.01

OH

Pekerja

75000

L.02

0.5

OH

Tukang Besi

95000

L.03

0.01

OH

Kepala Tukang

110000

L.04

0.005

OH

Mandor

100000

B

BAHAN

1

7

A.4.6.2.5

1

Buah

Floor Hinges

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

Buah A

9

Pemasangan Engsel Pintu TENAGA

L.01

0.015

OH

Pekerja

75000

L.02

0.15

OH

Tukang Kayu

95000

L.03

0.015

OH

Kepala Tukang

110000

L.04

0.0075

OH

Mandor

100000

B

BAHAN

1

8

1200000

A.4.6.1.5

1

Buah

Engsel Pintu

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Daun Pintu Double Teakwood

A

TENAGA

6000

L.01

1

OH

Pekerja

75000

L.02

3

OH

Tukang Kayu

95000

L.03

0.3

OH

Kepala Tukang

110000

L.04

0.05

OH

Mandor

100000

B

BAHAN

A.4.6.1.5a

0.04

m3

Kayu Klas II (Kamfer), pap

0.05

kg

Lem Kayu

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

Unit

Pemasangan Pintu PVC

1

(Bikinan)

A

7200000 12500

TENAGA

L.01

1

OH

Pekerja

75000

L.04

0.05

OH

Mandor

100000

B

BAHAN

0.04

m3

Pintu PVC

185000

11

A.4.2.1.9

1

Buah

Kunci Tanam

95000

1

Buah

Engsel Pintu

23000

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Sunscreen Allumunium

1

A L.01

0.08

OH

Pekerja

75000

L.02

0.8

OH

Tukang Besi

95000

L.03

0.08

OH

Kepala Tukang

110000

L.04

0.004

OH

Mandor

100000

B

BAHAN

1

13

A.4.6.2.6

1

m2

Sunscreen Allumunium

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

Buah A

350000

Pemasangan Engsel Jendela Kupu-Kupu TENAGA

L.01

0.01

OH

Pekerja

75000

L.02

0.1

OH

Tukang Besi

95000

L.03

0.01

OH

Kepala Tukang

110000

L.04

0.005

OH

Mandor

B

BAHAN

1

14

TENAGA

A.4.6.2.11

1

Buah

Engsel Jendela

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

Buah A

100.000.00

4000

Pemasangan Kunci Selot TENAGA

L.01

0.02

OH

Pekerja

75000

L.02

0.2

OH

Tukang Besi

95000

L.03

0.02

OH

Kepala Tukang

110000

L.04

0.001

OH

Mandor

100000

B

BAHAN

1

Buah C

Kunci Selot PERALATAN

8000

16

A.4.2.1.4

1

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

Buah A

17

TENAGA

L.01

1.05

OH

Pekerja

75000

L.02

1.05

OH

Tukang Besi

95000

L.03

0.105

OH

Kepala Tukang

110000

L.04

0.052

OH

Mandor

100000

B

BAHAN

15

Kg

Besi Siku L.30.30.3

7500

32.8

Kg

Besi Plat Baja

13000

0.05

Kg

Kawat Las

55000

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pengecatan Permukaan Baja dengan Meni Besi

A.4.7.1.16

1

A

18

Pemasangan Pintu Shaft Besi

TENAGA

L.01

0.02

OH

Pekerja

75000

L.02

0.2

OH

Tukang Cat

95000

L.03

0.002

OH

Kepala Tukang

110000

L.04

0.0025

OH

Mandor

100000

B

BAHAN

0.1

kg

Meni Besi

0.01

kg

Perekat/Lem

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.6.2.17a

1

m2

(Bikinan)

A

25000 55000

Pemasangan Kaca Boven Tebal 5 mm TENAGA

L.01

0.015

OH

Pekerja

75000

L.04

0.00075

OH

Mandor

100000

B

BAHAN

1.1

m2

Kaca Boven Tebal 5 mm

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

110000

F

19

1

Buah

Harga Satuan Pekerjaan (D+E)

Pemasangan Kunci Raam Alumunium

A

Tenaga

L.01

0.01

OH

Pekerja

75000

L.02

0.1

OH

Tukang Besi

95000

L.03

0.01

OH

Kepala Tukang

110000

L.04

0.005

OH

Mandor

100000

B

Bahan

1

20

1

Buah

Kunci Raam Alumunium

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

buah

15000

Pemasangan Pintu Raam

A

Tenaga

L.01

0.043

OH

Pekerja

75000

L.02

0.043

OH

Tukang Besi

95000

L.03

0.0043

OH

Kepala Tukang

110000

L.04

0.0021

OH

Mandor

100000

B

Bahan

m'

Profil Allumunium

1.1

21

2

buah

Skrup Fixer

0.06

Tube

Sealant

1

C

PERALATAN

D

Jumlah A + B + C (per m')

F

Overhead & Profit (contoh 10%)

G

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Raam Jendela Allumunium

A

Tenaga

80000 750 50000

L.01

0.043

OH

Pekerja

75000

L.02

0.043

OH

Tukang Besi

95000

L.03

0.0043

OH

Kepala Tukang

110000

L.04

0.0021

OH

Mandor

100000

B

Bahan

m'

Profil Allumu

buah

Skrup Fixer

1.1 2

80000 750

0.06

22

A.4.6.2.9

1

50000

C

PERALATAN

D

Jumlah A + B + C

D

Overhead & Profit (contoh 10%)

E

Harga Satuan Pekerjaan (D+E)

Buah

Pemasangan Kait Angin

A

Tenaga

0.015

OH

Pekerja

75000

L.02

0.15

OH

Tukang Besi

95000

L.03

0.015

OH

Kepala Tukang

110000

L.04

0.008

OH

Mandor

100000

B

Bahan

23

1

Buah

Kait Angin

15000

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Railing Tangga

A

Tenaga

L.01

0.043

OH

Pekerja

75000

L.02

0.043

OH

Tukang Besi

95000

L.03

0.0043

OH

Kepala Tukang

110000

L.04

0.0021

OH

Mandor

100000

B

Bahan

m'

Railing tangga

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (contoh 10%)

F

Harga Satuan Pekerjaan (D+E)

1.1

1

Sealant

L.01

1

IV

Tube

400000

PEKERJAAN PLAFOND A.4.4.2.27

1

m2 A

Plafond Expose Aci TENAGA

L.01

0.2

OH

Pekerja

75000

L.02

0.1

OH

Tukang batu

95000

L.03

0.01

OH

Kepala Tukang

110000

L.04

0.01

OH

Mandor

100000

B

BAHAN

Kg

Portland Semen

C

PERALATAN

3.25

1050

2

A.4.5.1.1

1

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m2 A

3

V 2

Pemasangan Plafond Asbes Plat TENAGA

L.01

0.03

OH

Pekerja

75000

L.02

0.07

OH

Tukang Kayu

95000

L.03

0.007

OH

Kepala Tukang

110000

L.04

0.004

OH

Mandor

100000

B

BAHAN

1.1

lbr

Plat Asbes

0.01

kg

Paku

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan List Tepi Kayu Profil

A

TENAGA

A.4.5.1.9

1

15500 15000

L.01

0.05

OH

Pekerja

75000

L.02

0.05

OH

Tukang Kayu

95000

L.03

0.005

OH

Kepala Tukang

110000

L.04

0.003

OH

Mandor

100000

B

BAHAN

1.05

lbr

List Kayu Profil

0.01

kg

Paku

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

4800 15000

PEKERJAAN PASANGAN LANTAI DAN DINDING A.4.4.3.36

1

m2 A

Pemasangan Lantai Keramik 20 x 20 cm TENAGA

L.01

0.7

OH

Pekerja

75000

L.02

0.35

OH

Tukang Batu

95000

L.03

0.035

OH

Kepala Tukang

110000

L.04

0.035

OH

Mandor

100000

B

BAHAN

26.5

Buah

10.4

Kg

Ubin Keramik 20 x 20 cm 1,920.00 Portland Semen

1050

3

A.4.1.1.1

1.62

Kg

Semen Warna

0.045

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2 A

4

Pembuatan Lantai Rabat Beton Tritisan TENAGA

L.01

1.65

OH

Pekerja

75000

L.02

0.275

OH

Tukang Batu

95000

L.03

0.028

OH

Kepala Tukang

110000

L.04

0.083

OH

Mandor

100000

B

BAHAN

247

Kg

Portland Semen

869

Kg

Pasir Beton

999

Kg

Kerikil (maksimum 30 mm)

215

ltr

Air

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.4.3.54

1

m2 A

5

11000 315000

1050 250 229,63 15

Pemasangan Dinding Keramik 20 x 20 cm TENAGA

L.01

0.9

OH

Pekerja

75000

L.02

0.45

OH

Tukang Batu

95000

L.03

0.045

OH

Kepala Tukang

110000

L.04

0.045

OH

Mandor

100000

B

BAHAN

26.5

Buah

Keramik

2080

9.3

Kg

Portland Semen

1050

1.94

Kg

Semen Warna

0.018

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.4.3.34

1

m2 A

11000 315000

Pemasangan Lantai Keramik 40 x 40 cm TENAGA

L.01

0.7

OH

Pekerja

75000

L.02

0.35

OH

Tukang Batu

95000

L.03

0.035

OH

Kepala Tukang

110000

L.04

0.035

OH

Mandor

100000

B

BAHAN

10

7

8

A.4.4.3.39

Buah

Ubin Keramik 33x33 cm

8.19

Kg

Portland Semen

1.62

Kg

Semen Warna

0.045

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Plint Keramik Ukuran 10x20 cm

A

TENAGA

1

5777,78 1050 11000 315000

L.01

0.09

OH

Pekerja

75000

L.02

0.09

OH

Tukang Batu

95000

L.03

0.009

OH

Kepala Tukang

110000

L.04

0.005

OH

Mandor

100000

B

BAHAN

A.4.4.3.58

5.3

Buah

Ubin Keramik

2500

1.14

Kg

Portland Semen

1050

0.003

m3

Pasir Pasang

0.025

Kg

Semen Warna

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m2

Pemasangan Batu Tempel Dinding Canopy

1

A

315000 11000

TENAGA

L.01

0.7

OH

Pekerja

75000

L.02

0.35

OH

Tukang Batu

95000

L.03

0.035

OH

Kepala Tukang

110000

L.04

0.035

OH

Mandor

100000

B

BAHAN

1.1

m2

Batu Tempel

11.75

Kg

Portland Semen

0.035

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

110000 1050 370000

9

A.4.5.1.9a

1

(Bikinan)

10

m'

Pemasangan Nosing Tangga

A

TENAGA

L.01

0.05

OH

Pekerja

75000

L.04

0.003

OH

Mandor

100000

B

BAHAN

1

lbr

Nosing Tangga

0.01

kg

Paku

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.7.1.10

1

m2 A

TENAGA

OH

Pekerja

75000

L.02

0.063

OH

Tukang Cat

95000

L.03

0.0063

OH

Kepala Tukang

110000

L.04

0.003

OH

Mandor

100000

B

BAHAN

kg

Cat Minyak

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.7.1.10

1

m2

Water Proofing R.Lavatory TENAGA

0.02

OH

Pekerja

75000

L.04

0.003

OH

Mandor

100000

B

BAHAN

kg

Cat pelapis anti bocor

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

Buah

Pemasangan Lampu SL 18 W

PEKERJAAN PENERANGAN A.4.5.2.1 (Bikinan)

45000

L.01

0.2

1

Plint Lantai Jeglok Cat Minyak

0.02

A

VI

13000

L.01

0.1

11

75000

1

A

TENAGA

110000

L.01

0.12

OH

Pekerja

75000

L.02

0.12

OH

Tukang Listrik

95000

L.03

0.012

OH

Kepala Tukang

110000

L.04

0.006

OH

Mandor

100000

B

BAHAN

1

2

A.4.5.2.2

1

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A

27000

Pemasangan Down Light SL 18 W TENAGA

L.01

0.12

OH

Pekerja

75000

L.02

0.12

OH

Tukang Listrik

95000

L.03

0.012

OH

Kepala Tukang

110000

L.04

0.006

OH

Mandor

100000

B

BAHAN

1

A.4.5.2.3

1

Buah

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A L.01

Down Light SL 18 W

C

Buah

(Bikinan)

120000

Pemasangan Lampu Baret 40 W TENAGA

0.12

OH

Pekerja

L.02

0.12

OH

Tukang Listrik

95000

L.03

0.012

OH

Kepala Tukang

110000

L.04

0.006

OH

Mandor

100000

B

BAHAN

1

4

Lampu SL 18 W

C

Buah

(Bikinan)

3

Buah

A.4.5.2.4

1

Buah C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

Buah

(Bikinan)

Lampu Baret 40 W

A

75000

1135000

Pemasangan Ceiling Fan TENAGA

L.01

0.15

OH

Pekerja

75000

L.02

0.3

OH

Tukang Listrik

95000

L.03

0.03

OH

Kepala Tukang

110000

L.04

0.075

OH

Mandor

100000

B 1

5

A.4.5.2.5

1

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A

185000

Pemasangan Stop Kontak 200 W TENAGA

L.01

0.1

OH

Pekerja

75000

L.02

0.2

OH

Tukang Listrik

95000

L.03

0.02

OH

Kepala Tukang

110000

L.04

0.005

OH

Mandor

100000

B

BAHAN

1

A.4.5.2.6

1

Buah

Stop Kontak 200 W

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

Buah

(Bikinan)

A

13000

Pemasangan Saklar Tunggal TENAGA

L.01

0.1

OH

Pekerja

75000

L.02

0.2

OH

Tukang Listrik

95000

L.03

0.02

OH

Kepala Tukang

110000

L.04

0.005

OH

Mandor

100000

B

BAHAN

1

7

Ceiling Fan

C

Buah

(Bikinan)

6

Buah

BAHAN

A.4.5.2.7

1

Buah C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

Buah

(Bikinan)

A L.01

Saklar Tunggal

10000

Pemasangan Saklar Ganda TENAGA

0.1

OH

Pekerja

L.02

0.2

OH

Tukang Listrik

95000

L.03

0.02

OH

Kepala Tukang

110000

L.04

0.005

OH

Mandor

100000

B

BAHAN

1

Buah

Saklar Ganda

C

PERALATAN

D

Jumlah A + B + C

75000

13500

VII 1

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

PEKERJAAN SANITAIR A.5.1.1.2

1

Buah A

2

TENAGA

L.01

1

OH

Pekerja

75000

L.02

1.5

OH

Tukang Batu

95000

L.03

1.5

OH

Kepala Tukang

110000

L.04

0.16

OH

Mandor

100000

B

BAHAN

A.5.1.1.14

1

Buah

Kloset Jongkok

6

kg

Portland Semen

0.01

m3

Pasir Pasang

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

1

Buah A

140000 1050 315000

Pemasangan Floor Drain TENAGA

L.01

0.01

OH

Pekerja

75000

L.02

0.1

OH

Tukang Batu

95000

L.03

0.01

OH

Kepala Tukang

110000

L.04

0.005

OH

Mandor

100000

B

BAHAN

1

3

Pemasangan Closet Jongkok Porselen

A.5.1.1.19

1

Buah

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

Buah A

L.01

Floor Drain

C

25000

Pemasangan Kran Air TENAGA

0.01

OH

Pekerja

L.02

0.4

OH

Tukang Batu

L.03

0.04

OH

Kepala Tukang

110000

L.04

0.005

OH

Mandor

100000

B

BAHAN

1

Buah

Kran Air

25,000.00

0.0025

Buah

Sealtape

3,500.00

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

75000 95000

4

A.5.1.1.12

1

Buah A

5

0.03

OH

Pekerja

75000

L.02

0.3

OH

Tukang Batu

95000

L.03

0.03

OH

Kepala Tukang

110000

L.04

0.015

OH

Mandor

100000

B

BAHAN

A.5.1.1.7

1

unit

Bak Cuci Piring

225000

1

bh

Water drain

50000

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

1

Buah

TENAGA

3

OH

Pekerja

75000

L.02

4.5

OH

Tukang Batu

95000

L.03

0.05

OH

Kepala Tukang

110000

L.04

0.9

OH

Mandor

100000

B

BAHAN

0.12

A.4.6.2.18

1

Buah

Bak Fiberglass

275000

-

Perlengkapan 12% Bak Fiberglass

275000

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m2 A

Pemasangan Kaca Cermin 40x60 cm TENAGA

L.01

0.015

OH

Pekerja

75000

L.02

0.15

OH

Tukang Kayu

95000

L.03

0.015

OH

Kepala Tukang

110000

L.04

0.00075

OH

Mandor

100000

B

BAHAN

1.1

1

Pemasangan Bak Mandi Fiberglass

L.01

1

IX

TENAGA

L.01

A

6

Pemasangan Meja Pantry + Wash Bak

m2

Kaca Cermin 40x60 cm

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

PEKERJAAN CAT-CATAN A.4.7.1.10

1

m2 A

Pengecatan Tembok TENAGA

275000

2

L.01

0.02

OH

Pekerja

75000

L.02

0.063

OH

Tukang Cat

95000

L.03

0.0063

OH

Kepala Tukang

110000

L.04

0.003

OH

Mandor

100000

B

BAHAN

0.1

kg

Plamir

0.1

kg

Cat Dasar

12000

0.26

kg

Cat Penutup 2 Kali

23000

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.7.1.7

1

m2 A

3

20000

Pelituran Daun Pintu TENAGA

L.01

0.04

OH

Pekerja

75000

L.02

0.06

OH

Tukang Cat

95000

L.03

0.016

OH

Kepala Tukang

110000

L.04

0.003

OH

Mandor

100000

B

BAHAN

0.15

ltr

Pelitur

0.372

ltr

Pelitur Jadi

2

lbr

Ampelas

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A.4.7.1.4

1

m2 A

61000 61000 3500

Pengecatan Listplank Kayu TENAGA

L.01

0.07

OH

Pekerja

75000

L.02

0.009

OH

Tukang Cat

95000

L.03

0.006

OH

Kepala Tukang

110000

L.04

0.003

OH

Mandor

100000

B

BAHAN

0.2

kg

Cat Menie

0.15

kg

Plamuur

25000

0.17

kg

Cat Dasar

36500

0.26

kg

Cat Penutup

55000

23000

4

A.4.7.1.10

0.01

buah

Kuas

14000

0.03

kg

Pengencer

10000

0.2

lbr

Ampelas

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

1

m2 A

L.01

Pengecatan Plafond TENAGA

0.02

OH

Pekerja

L.02

0.063

OH

Tukang Cat

L.03

0.0063

OH

Kepala Tukang

110000

L.04

0.003

OH

Mandor

100000

B

BAHAN

0.1

kg

Plamir

0.1

kg

Cat Dasar

12000

0.26

kg

Cat Penutup 2 Kali

23000

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

D

75000 95000

20000

HARGA SATUAN PEKERJAAN HALAMAN DAN BANGUNAN PENUNJANG

I

PEKERJAAN SALURAN

1

A.5.1.1.35a

1

(Bikinan) L.01

2

3500

A.5.1.1.35

m'

Pemasangan Saluran Terbuka U 20

A

TENAGA

0.14

OH

Pekerja

L.02

0.07

OH

Tukang Batu

L.03

0.007

OH

Kepala Tukang

110000

L.04

0.007

OH

Mandor

100000

B

BAHAN

1.2

bh

Saluran U 20

0.027

m3

Batu Bata

3.92

kg

Semen Portlan

0.056

m3

Pasir Pasang

315000

0.024

m3

Pasir Urug

160000

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Saluran Buis Beton ø 20

75000 95000

36000 435000 1050

A

3

L.01

0.14

OH

Pekerja

75000

L.02

0.07

OH

Tukang Batu

95000

L.03

0.007

OH

Kepala Tukang

110000

L.04

0.007

OH

Mandor

100000

B

BAHAN

A.5.1.1.16

1.1

bh

pipa beton

0.027

m3

Batu Bata

3.92

kg

Semen Portlan

0.056

m3

Pasir Pasang

315000

0.024

m3

Pasir Urug

160000

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

Buah A

II 1

TENAGA

35000 435000 1050

Pemasangan Bak Kontrol 45x45 TENAGA

L.01

3.2

OH

Pekerja

75000

L.02

1.15

OH

Tukang Batu

95000

L.03

0.011

OH

Kepala Tukang

110000

L.04

0.016

OH

Mandor

100000

B

BAHAN

70

buah

Batu Bata

580

77

kg

Portland Semen

0.13

m3

Pasir Pasang

315000

0.09

m3

Pasir Beton

350000

0.02

m3

Kerikil

240000

1.6

kg

Baja Tulangan

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa PVC tipe AW Ø ½"

A

TENAGA

1050

13037,20

SEPTICTANK+PERESAPAN A.5.1.1.25

1

L.01

0.036

OH

Pekerja

75000

L.02

0.06

OH

Tukang Batu

95000

L.03

0.006

OH

Kepala Tukang

110000

L.04

0.002

OH

Mandor

100000

B

BAHAN

1.2

m'

Pipa PVC Ø ½"

7,000.00

0.35

Ls

Perlengkapan 35% x pipa

7,000.00

2

3

A.5.1.1.32

1

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

m'

Pemasangan Pipa PVC tipe AW Ø 4"

A

TENAGA

L.01

0.036

OH

Pekerja

75000

L.02

0.06

OH

Tukang Batu

95000

L.03

0.006

OH

Kepala Tukang

110000

L.04

0.002

OH

Mandor

100000

B

BAHAN

1.2

m'

Pipa PVC Ø 4"

30000

0.35

Ls

Perlengkapan 35% x pipa

30000

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

A.2.3.1.13

1

m2 A

TENAGA

L.01

0.15

OH

Pekerja

75000

L.04

0.015

OH

Mandor

100000

B

BAHAN

kg

Ijuk

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

6

4

Pemasangan Lapisan Ijuk

A.2.3.1.11a

1

(Bikinan)

m3 A

7000

Urugan Kerikil+Batu Pecah TENAGA

L.01

0.3

OH

Pekerja

75000

L.04

0.01

OH

Mandor

100000

B

BAHAN

1.2

m3

Kerikil

180000

1.2

m3

Batu Pecah

260000

C

PERALATAN

D

Jumlah A + B + C

E

Overhead & Profit (10%)

F

Harga Satuan Pekerjaan (D+E)

JUMLAH Rp

12,000,000.000 12,500.000 7,500.000 5,000.000

12,500.000 1,250.000 13,750.000 135,588.200

7,500.000 9,500.000 1,100.000 500.000 104,662.000 60,612.000 300.000 43,750.000

123,262.000 12,326.200 135,588.200

13,750,000 1,000,000 2,200,000

AP

93995 85450 78750 6700

85450 8545 93995

15583

42500 37500 5000

42500 4250 46750

257812.5 21250 18750 2500

216000

237250 23725 260975

896917.59 111800 90000 19000 2200 600 703579.63 241500 223250 235829.63 3000

815379.63 81537.96 896917.59

130372 13070

5250 6650 770 400 105450 102900 2550

118520

118520 130372

130372 13070 5250 6650 770 400 105450 102900 2550

118520

11852 130372

170016 69160 39000 24700 2860 2600 85400 80000 4500 900

154560 15456 170016

181016 69160 39000 24700 2860 2600 95400 90000 4500 900

164560 16456 181016

369264,5 87780 49500 31350 3630 3300 24915 80000 6000 1800 75765 42350 42000

335695 33569,50 369264,50

385932,80 87,780.00 49,500.00 31,350.00 3,630.00

3,300.00 263,068.00 80000 60000 1800 90918 42350 42000

350848 35084,80 385932,80

461664,50 87780 49500 31,350.00 3,630.00 3,300.00 331915 80000 6000 1800 75765 42350 126000

419695 41969,50 461664,50

346769,50 87780 49500 31350 3630 3300 227465 60000 6000 1350 75765 42350

42000

315245 31524,50 346769,50

1077191,70

161255 123750 26125 3080 8300 818010,19 403200 173000 238585,19 3225

979625,19 97962,52 1077191,70

103900,50 34280 22275 3135 3135 3135 1100 1500 60175 9870 300 35280 850 5775 3150 4950

94455 9445,50 103900,50

25910,50 1800 1500 300 22000 22000

23800 2380 26180

189725,80 63850 15000 42750 1100 5000

108628 21576 27900 9800 5600 37800 5952

172478 17247,80 189725,80

138935 20055 11250 7125 880 800 106250 106250

126305 12630

138935

112618 51400 30000 19000 2200 200 50980 32500 8400 10080

102380 10238 112618

35475 24000 22500 1500 8250 8250

32250 3225 35475

58384,33 20785 6075 12825 1485 400 32291,67 25000 7291,67

53076,67 5307,67 58384,33

64570,50 35950 18750 14250 1650 1300 22750 22000 750

58700 5870,50 64570,50

149380 29200 7500 19000 2200 500 106600 105300 1300

135800 13580 149380

TUR

892171,50 199500 112500 71250 8250 7500 511565 312000

122850 176715

811065 81106 892171,50

533346 103740 58500 37050 4290 3900 381210 312000 69120

484860 48486,50 533346

237050 23500 22500 1000 192000 192000

215500 21550 237050

235028,75 69200 45000 19000 2200 3000 144462,50 81200 34597,50 28665

213662,50 21366,25 235028,75

113177,35

34600 22500 9500 1100 1500 68288,50 40600 15088,50 12600

102888,50 10288,85 113177,35

109308,10

34600 22500 9500 1100 1500 64771 40600 8736 15435

99371 9937 109308,10

60840,78 39900 22500 14250 1650 1500 15409,80 8164,80 7245

55309,80 5530,98 60840,78

58345,98 39900 22500 14250 1650 1500 13141,80 4636,80 8505

53041,80 5304,18 58345,98

110542,30 7993 3225 4085 473

210 92500 88000 1500 3000

100493 10049,30 110542,30

127710 17100 1125 14250 1650 75 99000 99000

116100 11610 127710

175835 49850 750 47500 1100 500 110000 110000

159850 15985 175835

1374835 49850 750 47500 1100 500 1200000

1200000

1249850 124985 1374835

26152,50 17775 1125 14250 1650 750 6000 6000

23775 2377,50 26152,50

755287,50 398000 75000 285000 33000 5000 288625 288000 625

686625 68662,50 755287,50

225940 80000 75000 5000 125400 7400

95000 23000

205400 20540 225940

458320 91200 6000 76000 8800 400 350000 350000

441200 44120 456320

17435 11850 750 9500 1100 500 4000 4000

15850 1585 17435

33880 22800 1500 19000 2200 100 8000 8000

30800 3080 33880

810590 195250 78750 99750 11550 5200 541650 112500 426400 2750

736900 73690 810590

26422 20970 1500 19000 220 250,50 3050 2500 550

24020 2402 26422

134420 1200 1125 75 121000 121000

12220 12220

134420

178035 11850 750 9500 1100 500 150000 150000

161850 16185 178035

110542,30 7993 3225 4085 473 210 92500 88000 1500 3000

100493

10049,30

110542,30

109230,55

7993 3225 4085 473 210 92500 88000 1500

3000

100492

10049,20

110542,20

36107,50 17825 1125 14250 1650 800 15000 15000

32825 3282,50 36107,50

492726,3 7933 3250 4085 473 210 440000 440000

447933 44793,30 492726,30

33013,75 26600 15000 9500 1100 1000 3412,50 3412,50

30012,50 2001,25 33013,75

28997 10070 2250 6650 770 400 17200 17050 150

27270 2727 28997

15994 9350 3750 4750 550 300 5190 5040 150

14540 1454 15994

205584,50 93100 52500 33250 3850 3500 93795 50880 10920

17820 14175

186895 18689,50 205584,50

957528 161255 123750 26125 3080 8300 709225 253175 217250 229400 3225

870480 87048,50 957528

232754,50 119700 67500 42750 4950 4500 91895 55120 9765 21340 5670

211595 21159,50 232754,50

210619,51 93100 52500 32250

3850 3500 86423,06 57777,78 8599,50 17820 14175

191472,28 19147,23 210619,51

35702,70 16790 6750 8550 990 500 15667 13250 1197 945 275

32457 3245,70 35702,70

261208,75 93100 52500 33250 3850 3500 144362,50 121000 12337,50 11025

237462,50 23746,25 261208,75

87208 4150 3750 300 75130 75000 130

79280 7928 87208

12828,20 8478 1500 5985 963 300 4500 4500

11662 1166,20 12828,20

26,180.00 1800 1500 300 22000 22000

23800 2380 26180

54252 22320

9000 11400 1320 600 27000 27000

49320 4932 54252

156552 22320 9000 11400 1320 600 120000 120000

142320 14232 156552

1273052 22320 9000 11400 1320 600 1135000 1135000

1157320 115732 1273052

259100 50550 11250 28500 3300 7500

185000 185000

235550 23550 259100

46420 29200 7500 19000 2200 500 13000 13000

42200 4220 46420

43120 29200 7500 19000 2200 500 10000 10000

39200 3920 43120

46970 29200 7500 19000 2200 500 13500 13500

42700

4270 46970

602745 398500 75000 142500 165000 16000 149450 140000 6300 3150

547950 54795 602745

40535 11850 750 9500 1100 500 25000 25000

36850 3685 40535

75524,63 43650 750 38000 4400 500 25008,75 25000 8,75

68658,75 6865,88 75524,63

341605 35550 2250 28500 3300 1500 275000 225000 50000

310550 31055 341605

1161600 748000 225000 427500 5500 90000 308000 275000 33000

1056000 105600 1161600

351560 17100 1125 14250 1650 75 302500 302500

319600 31960 351560

19423,80 8478

1500 5985 693 300 9180 2000 1200 5980

17658 1765,80 19423,80

54562,20 10760 3000 5700 1760 300 38842 9150 22692 7000

49602 4960,20 54562,20

40766 7065 5250 855 660 300 29995 4600 3750 6205 14300

140 300 700

37060 3706 40766

19423,80 8478 1500 5985 693 300 9180 2000 1200 5980

17658 1765,80 19423,80

PENUNJANG

108832,20 18620 10500 6650 770 700 80541 43200 11745,50 4116 17640 3840

99161 9161 108832,20

103907,10

18620 10500 6650 770 700 75841 38500 11745 4116 17640 3840

94461 9446,10 103907,10

628781,47 352060 240000 109250 1210 1600 219559,52 40600 80850 40950 31500 4800 20859,52

571619,52 57161,95 628781,47

22121 9260 2700 5700 660 200 10850 8400 2450

20110 2011 22121

61336 9260 2700 5700 660 200 46500 36000 10500

55760 5576 61336

60225 12750 11250 1500 42000 42000

54750 5475 60225

606650 23500 22500 1000 528000 216000 312000

551500 55150 606650

A. Pekerjaan Persiapan No

Uraian Pekerjaan

Vol

Sat.

1128.68

m2

I

PEKERJAAN PERSIAPAN :

1

Pembersihan lapangan

2

Pengukuran dan bouwplank

136.8

m

3

Penyediaan listrik & air kerja

1

ls

4

Papan nama proyek

1

ls

5

Administrasi proyek

1

ls

Vol

Sat.

B. Pekerjaan Struktur dan Atap No

Uraian Pekerjaan

a.

PEK. TANAH :

1

Galian Tanah

1409.435

m3

2

Urugan kembali

469.812

m3

b.

PEK. BETON BERTULANG 1:2:3 :

I

PEKERJAAN STRUKTUR LANTAI 1 :

1

Sirtu

105.56

m3

2

Lantai kerja 1:3:5 bwh poor/sloof t = 5 cm

28.71

m3

3

Beton balok RIB

34.08

m3

4

Beton balok sloof

35.26

m3

5

Beton plat pondasi

48.29

m3

6

Beton kolom struktur

36.69

m3

7

Beton balok induk

64.13

m3

8

Beton balok anak

19.46

m3

9

Beton plat lantai

81.518

m3

10

Beton plat daak canopy

2.05

m3

11

Beton listplank

0.51

m3

12

Tangga beton

7.96

m3

13

Water proofing daak canopy

11.98

m2

II

PEK.BETON BERTULANG LANTAI 2 :

1

Beton kolom struktur

11.15

m3

2

Beton balok ring atas

9.70

m3

3

Beton plat daak

3.97

m3

4

Water proofing daak

39.72

m2

c.

PEK. RANGKA ATAP DAN ATAP :

1

Kuda kuda baja ringan ( lengkap )

1,186.88

m2

2

Atap genteng keramik glasur

1,088.62

m2

3

Bubungan genteng keramik glasur

2.41

m

4

Ornamen puncak atap

6.00

bh

5

Corong talang ø 3" PVC

68.00

m'

6

Listplank ky bengkirai 2X2/20

266.80

m'

7

Flashing atap

266.80

m'

Vol

Sat.

C. Pekerjaan Finishing Arsitektur No

Uraian Pekerjaan

a.

PEK. FINISHING ARSITEKTUR LT. 1 :

I

PEK. PONDASI BATU BELAH :

1

Pondasi batu belah 1:6

175.60

m3

2

Aanstamping

94.99

m3

3

Urug pasir bwh pondasi + urug pasir bwh r

17.59

m3

4

Urugan tanah peninggian bangunan t = 6

764.90

m3

II

PEK. PAS. BT. BATA / PLESTERAN :

1

Pas. rollag 1:3

6.30

m2

2

Pas. bt. bata 1:3

556.20

m2

3

Pas. bt. bata 1:6

1334.02

m2

4

Plesteran 1:3

1112.40

m2

5

Plesteran 1:6

2668.04

m2

6

Plesteran beton

99.60

m2

7

Beton praktis sloof

21.17

m'

8

Beton praktis kolom

816.00

m'

9

Beton praktis balok latei

274.60

m'

III

PEK. PAS. KOSEN :

1

Kosen aluminium 4"

928.60

m'

2

Kaca bening 5 mm

74.19

m2

3

Kaca raam jendela 5 mm

10.01

m2

4

Kunci tanam

59.00

bh

5

Floor hinges

4.00

unit

6

Kunci raam alluminium

2.00

unit

7

Engsel pintu

156.00

bh

8

Daun pintu double teakwood

27.84

m2

9

Pintu PVC lengkap kunci,engsel,kusen

27.00

unit

10

Pintu raam alluminium

2.00

unit

11

Sun screen hollow finish cat

177.40

m2

12

Raam jendela alluminium

920.00

m'

13

Engsel jendela

86.00

bh

14

Grendel

109.00

bh

15

Raam skor

109.00

bh

16

Pintu shaft besi 40/60 ( lengkap )

2.00

bh

17

Railing tangga pipa hitam finish cat Lt. 1 ke

225.63

m'

18

Railing depan tralis besi finish cat lt. cano

41.00

m'

IV

PEK. PLAFOND :

1

Plafond exspose aci

135.65

m2

2

Plafond asbes plat

614.24

m2

3

List tepi kayu profil

909.00

m'

V

PEK. PASANG LANTAI DAN DINDING :

1

Urug pasir bawah lantai

79.68

m3

2

Lantai rabat beton tritisan

17.83

m3

3

Lantai keramik 20x20 cm lavatory

78.39

m2

4

Dinding keramik 20x25 cm Lavatory

188.96

m2

5

Lt. keramik warna 40/40 cm

660.63

m2

6

Lantai keramik warna u.tangga 40/40 cm

29.80

m2

7

Plint lantai jeglok finish cat minyak

558.70

m'

8

Batu tempel dinding canopy

20.39

m2

9

Nosing tangga

34.38

m'

VI

PEK. PENERANGAN :

1

Lampu SL 18 W

106

bh

2

Down light SL 18 W

67

bh

3

Lampu baret 40 W

2

bh

4

Ceiling fan

27

bh

5

Stop kontak 200 W

56

bh

6

Saklar tunggal

28

bh

7

Saklar ganda

53

bh

VIII

PEK.SANITAIR :

1

Closet jongkok warna tua

27

bh

2

Saringan air ( floor drain )

27

bh

3

Kran air

53

bh

4

Meja pantry + wash bak

4

bh

5

Bak mandi Fiber

27

bh

6

Kaca cermin 40x60 tepi dibevel

27

bh

IX

PEK. CAT-CATAN :

1

Cat tembok

2047.948

m2

2

Cat plafond

706.38

m2

3

Pelituran Daun Pintu

90.72

m2

b.

PEK.FINISHING ARSITEKTUR LT.2 :

I

PEK. PAS.BT.BATA/PLESTERAN,BETON PRAKTIS :

1

Pas. bt. bata 1:3

208.68

m2

2

Pas. bt. bata 1:6

1348.71

m2

3

Plesteran 1:3

417.36

m2

4

Plesteran 1:6

2697.42

m2

5

Plesteran beton

225.60

m2

6

Beton praktis kolom

344.00

m'

7

Beton praktis balok latei

259.30

m'

II

PEK. PAS. KOSEN :

1

Kosen aluminium 4"

710.00

m'

2

Raam jendela alluminium

517.20

m'

3

Kaca bening 5 mm

101.88

m2

4

Kaca boven 5 mm

3.90

m2

5

Kunci tanam

52.00

bh

6

Engsel pintu

104.00

bh

7

Daun pintu double teakwood

87.36

m2

8

Pintu PVC lengkap kunci,engsel,kusen

26.00

unit

9

Sun screen hollow finish cat

25.48

m2

10

Engsel jendela

384.00

bh

11

Grendel

96.00

bh

12

Raam skor

18.00

bh

III

PEK. PLAFOND :

1

Plafond asbes plat

665.57

m2

2

List tepi kayu profil

866.95

m'

IV

PEK. PASANG LANTAI DAN DINDING :

1

LT keramik 20x20 cm lavatory

58.44

m2

2

Dinding keramik 20x25 cm lavatory

249.60

m2

3

Lt. keramik 40/40 cm

511.86

m2

4

Plint lantai jeglok finish cat minyak

315.00

m'

5

Water proofing R lavatory

249.60

m2

V

PEK. PENERANGAN :

1

Lampu SL 18 W

104

bh

2

Down light SL 18 W

54

bh

4

Ceiling fan

0

bh

5

Stop kontak 200 W

26

bh

6

Saklar tunggal

54

bh

7

Saklar ganda

24

bh

VI

PEK.SANITAIR :

1

Closet jongkok warna tua

26

bh

2

Saringan air ( floor drain )

26

bh

3

Kran air

52

bh

5

Kaca cermin 40x60 tepi dibevel

0

bh

6

Bak mandi Fiber

26

bh

IX

PEK. CAT-CATAN :

1

Cat tembok

2987.40

m2

2

Cat plafond

706.38

m2

3

Pelituran Daun Pintu

87.36

m2

4

Cat listplank kayu

67.68

m2

Vol

Sat.

171.45

m'

D. Pekerjaan Halaman dan Bangunan Penunjang No

Uraian Pekerjaan

a.

PEK. SALURAN

1

Saluran terbuka U 20

2

Saluran buis beton ø 20

2.07

m'

3

Bak kontrol 45x45

33.00

bh

b.

SEPTICTANK + PERESAPAN (8 UNIT)

1

Galian tanah

36.682

m3

2

Urugan tanah kembali

10.14

m3

3

Pasir urug

2.208

m3

4

Aanstamping

15.064

m3

5

Beton bertulang (plat dasar,tutup)

12.64

m3

6

Dinding bata 1:3

117.395

m2

7

Plesteran 1:3

234.79

m2

8

Pipa hawa ø 1½" GIP

8

bh

9

Pipa PVC dia.4"

13

bt

10

Ijuk

1.295

m2

11

Kerikil+batu pecah

12

Sirtu

0.365

m3

4.8

m3

A. Pekerjaan Persiapan No

Uraian Pekerjaan

Sat.

Harga Satuan (Rp)

I

PEKERJAAN PERSIAPAN :

1

Pembersihan lapangan

m2

13,750.00

2

Pengukuran dan bouwplank

m2

135,588.20

3

Penyediaan listrik & air kerja

ls

13,750,000.00

4

Papan nama proyek

ls

1,000,000.00

5

Administrasi proyek

ls

2,200,000.00

B. Pekerjaan Struktur dan Atap No

Uraian Pekerjaan

Sat.

Harga Satuan (Rp)

a.

PEK. TANAH :

1

Galian Tanah

m3

93,995.00

2

Urugan kembali

m3

15,583.33

b.

PEK. BETON BERTULANG 1:2:3 :

I

PEKERJAAN STRUKTUR LANTAI 1 :

1

Sirtu

m3

257,812.50

2

Lantai kerja 1:3:5 bwh poor/sloof t = 5 cm

m3

896,917.59

3

Beton balok RIB

m3

3,132,742.69

4

Beton balok sloof

m3

5,796,978.97

5

Beton plat pondasi

m3

4,327,839.68

6

Beton kolom struktur

m

3

8,089,599.31

7

Beton balok induk

m

3

5,690,669.63

8

Beton balok anak

m

3

6,835,121.83

9

Beton plat lantai

m

3

6,202,881.27

10

Beton plat daak canopy

m

3

12,827,500.20

11

Beton listplank

m

3

4,269,676.32

12

Tangga beton

m

3

7,249,775.96

13

Water proofing daak canopy

m

2

25,910.50

II

PEK.BETON BERTULANG LANTAI 2 :

1

Beton kolom struktur

m3

18,960,699.34

2

Beton balok ring atas

m3

2,324,430.11

3

Beton plat daak

m3

6,581,466.10

4

Water proofing daak

m2

25,910.50

c.

PEK. RANGKA ATAP DAN ATAP :

1

Kuda kuda baja ringan ( lengkap )

m2

149,941.00

2

Atap genteng keramik glasur

m

2

138,935.00

3

Bubungan genteng keramik glasur

m

112,618.00

4

Ornamen puncak atap

bh

35,475.00

5

Corong talang ø 3" PVC

m'

58,384.33

6

Listplank ky bengkirai 2X2/20

m'

149,380.00

7

Flashing atap

m'

64,570.50

C. Pekerjaan Finishing Arsitektur No

Uraian Pekerjaan

Sat.

Harga Satuan (Rp)

a.

PEK. FINISHING ARSITEKTUR LT. 1 :

I

PEK. PONDASI BATU BELAH :

1

Pondasi batu belah 1:6

m3

892,171.50

2

Aanstamping

m

3

533,346.00

3

Urug pasir bwh pondasi + urug pasir bwh r

m

3

237,050.00

4

Urugan tanah peninggian bangunan t = 6

m

3

15,583.33

II

PEK. PAS. BT. BATA / PLESTERAN :

1

Pas. rollag 1:3

m2

235,028.75

2

Pas. bt. bata 1:3

m2

113,177.35

3

Pas. bt. bata 1:6

m2

109,308.10

4

Plesteran 1:3

m2

60,840.78

5

Plesteran 1:6

m

2

58,345.98

6

Plesteran beton

m

2

60,840.78

7

Beton praktis sloof

m'

200,414.50

8

Beton praktis kolom

m'

176,203.51

9

Beton praktis balok latei

m'

286,262.58

III

PEK. PAS. KOSEN :

1

Kosen aluminium 4"

m'

110,542.30

2

Kaca bening 5 mm

m

2

127,710.00

3

Kaca raam jendela 5 mm

m

2

134,420.00

4

Kunci tanam

bh

175,835.00

5

Floor hinges

unit

1,374,835.00

6

Kunci raam alluminium

unit

178,035.00

7

Engsel pintu

bh

26,152.50

8

Daun pintu double teakwood

m2

755,287.50

9

Pintu PVC lengkap kunci,engsel,kusen

unit

225,940.00

10

Pintu raam alluminium

unit

110,542.30

11

Sun screen hollow finish cat

m

2

458,320.00

12

Raam jendela alluminium

m'

109,230.55

13

Engsel jendela

bh

17,435.00

14

Grendel

bh

33,880.00

15

Raam skor

bh

26,422.00

16

Pintu shaft besi 40/60 ( lengkap )

bh

810,590.00

17

Railing tangga pipa hitam finish cat Lt. 1 ke

m'

492,726.30

18

Railing depan tralis besi finish cat lt. cano

m'

36,107.50

IV

PEK. PLAFOND :

1

Plafond exspose aci

m2

33,013.75

2

Plafond asbes plat

m2

28,997.00

3

List tepi kayu profil

m'

15,994.00

V

PEK. PASANG LANTAI DAN DINDING :

1

Urug pasir bawah lantai

m3

237,050.00

2

Lantai rabat beton tritisan

m3

957,528.00

3

Lantai keramik 20x20 cm lavatory

m2

205,584.50

4

Dinding keramik 20x25 cm Lavatory

m2

232,754.50

5

Lt. keramik warna 40/40 cm

m2

210,619.51

6

Lantai keramik warna u.tangga 40/40 cm

m

2

210,619.51

7

Plint lantai jeglok finish cat minyak

m'

12,828.20

8

Batu tempel dinding canopy

m

2

261,208.75

m'

87,208.00

9

Nosing tangga

VI

PEK. PENERANGAN :

1

Lampu SL 18 W

bh

54,252.00

2

Down light SL 18 W

bh

156,552.00

3

Lampu baret 40 W

bh

1,273,052.00

4

Ceiling fan

bh

259,100.00

5

Stop kontak 200 W

bh

46,420.00

6

Saklar tunggal

bh

43,120.00

7

Saklar ganda

bh

46,970.00

VIII

PEK.SANITAIR :

1

Closet jongkok warna tua

bh

602,745.00

2

Saringan air ( floor drain )

bh

40,535.00

3

Kran air

bh

75,524.63

4

Meja pantry + wash bak

bh

341,605.00

5

Bak mandi Fiber

bh

1,161,600.00

bh

351,560.00

6

Kaca cermin 40x60 tepi dibevel

IX

PEK. CAT-CATAN :

1

Cat tembok

m2

19,423.80

2

Cat plafond

m2

19,423.80

3

Pelituran Daun Pintu

m2

54,562.20

b.

PEK.FINISHING ARSITEKTUR LT.2 :

I

PEK. PAS.BT.BATA/PLESTERAN,BETON PRAKTIS :

1

Pas. bt. bata 1:3

m2

113,177.35

2

Pas. bt. bata 1:6

m

2

109,308.10

3

Plesteran 1:3

m

2

60,840.78

4

Plesteran 1:6

m

2

58,345.98

5

Plesteran beton

m

2

60,840.78

6

Beton praktis kolom

m'

176,203.51

7

Beton praktis balok latei

m'

286,262.58

II

PEK. PAS. KOSEN :

1

Kosen aluminium 4"

m'

110,542.30

2

Raam jendela alluminium

m'

109,230.55

3

Kaca bening 5 mm

m2

127,710.00

4

Kaca boven 5 mm

m2

134,420.00

5

Kunci tanam

bh

175,835.00

6

Engsel pintu

bh

26,152.50

7

Daun pintu double teakwood

m

755,287.50

8

Pintu PVC lengkap kunci,engsel,kusen

unit

225,940.00

9

Sun screen hollow finish cat

m

2

458,320.00

10

Engsel jendela

bh

17,435.00

11

Grendel

bh

33,880.00

12

Raam skor

bh

26,422.00

III

PEK. PLAFOND :

1

Plafond asbes plat

m2

28,997.00

2

List tepi kayu profil

m'

15,994.00

IV

PEK. PASANG LANTAI DAN DINDING :

1

LT keramik 20x20 cm lavatory

m2

205,584.50

2

Dinding keramik 20x25 cm lavatory

m2

232,754.50

3

Lt. keramik 40/40 cm

m

2

210,619.51

4

Plint lantai jeglok finish cat minyak

m'

12,828.20

5

Water proofing R lavatory

m

2

26,180.00

V

PEK. PENERANGAN :

1

Lampu SL 18 W

bh

54,252.00

2

Down light SL 18 W

bh

156,552.00

3

Lampu baret 40 W

bh

1,273,052.00

4

Ceiling fan

bh

259,100.00

5

Stop kontak 200 W

bh

46,420.00

6

Saklar tunggal

bh

43,120.00

7

Saklar ganda

bh

46,970.00

VI

PEK.SANITAIR :

1

Closet jongkok warna tua

bh

602,745.00

2

Saringan air ( floor drain )

bh

40,535.00

3

Kran air

bh

75,524.63

4

Meja pantry + wash bak

bh

341,605.00

5

Kaca cermin 40x60 tepi dibevel

bh

351,560.00

6

Bak mandi Fiber

bh

1,161,600.00

IX

PEK. CAT-CATAN :

1

Cat tembok

m2

19,423.80

2

Cat plafond

m

2

19,423.80

3

Pelituran Daun Pintu

m

2

54,562.20

4

Cat listplank kayu

m

2

40,766.00

2

D. Pekerjaan Halaman dan Bangunan Penunjang No a.

Uraian Pekerjaan PEK. SALURAN

Sat.

Harga Satuan (Rp)

1

Saluran terbuka U 20

m'

93,995.00

2

Saluran buis beton ø 20

m'

15,583.33

3

Bak kontrol 45x45

bh

237,050.00

b.

SEPTICTANK + PERESAPAN (8 UNIT)

1

Galian tanah

m3

93,995.00

2

Urugan tanah kembali

m

3

15,583.33

3

Pasir urug

m

3

237,050.00

4

Aanstamping

m

3

533,346.00

5

Beton bertulang (plat dasar,tutup)

m

3

1,077,191.70

6

Dinding bata 1:3

m

2

113,177.35

7

Plesteran 1:3

m

2

60,840.78

8

Pipa hawa ø 1½" GIP

bh

22,121.00

9

Pipa PVC dia.4"

bt

61,336.00

10

Ijuk

m

2

60,225.00

11

Kerikil+batu pecah

m

3

606,650.00

12

Sirtu

m3

257,812.50

A. Pekerjaan Persiapan No

Kode

I 1 2 3 4 5

A.2.2.1.9 A.2.2.1.4 LS LS LS

Uraian Pekerjaan PEKERJAAN PERSIAPAN : Pembersihan lapangan Pengukuran dan bouwplank Penyediaan listrik & air kerja Papan nama proyek Administrasi proyek

Vol

Sat.

1128.68 136.8 1 1 1

m2

Vol

Sat.

m' ls ls ls

A. Pekerjaan Persiapan B. Pekerjaan Struktur dan Atap No a.

Kode

Uraian Pekerjaan PEK. TANAH :

1

A.2.3.1.3 Galian Tanah

2

A.2.3.1.9 Urugan kembali

b. I

1409.435

m3

469.81

m3

PEK. BETON BERTULANG 1:2:3 : PEKERJAAN STRUKTUR LANTAI 1 :

1

A.2.3.1.14 Sirtu

105.56

m3

2

A.4.1.1.4 Lantai kerja 1:3:5 bwh poor/sloof t = 5 cm

28.71

m3

3

Beton balok RIB

34.08

m3

4

Beton balok sloof

35.26

m3

5

Beton plat pondasi

48.29

m3

6

Beton kolom struktur

36.69

m3

7

Beton balok induk

64.13

m3

8

Beton balok anak

19.46

m3

9

Beton plat lantai

81.518

m3

10

Beton plat daak canopy

2.05

m3

0.51

m3

7.96

m3

11.98

m2

11 12 13

A.4.1.1.8 Beton listplank Tangga beton A.4.7.1.10 Water proofing daak canopy

II

PEK.BETON BERTULANG LANTAI 2 :

1

Beton kolom struktur

11.150

m3

2

Beton balok ring atas

9.700

m3

3

Beton plat daak

3.970

m3

39.720

m2

4 c. 1

A.4.7.1.10 Water proofing daak PEK. RANGKA ATAP DAN ATAP : A.4.6.1.13 Kuda kuda baja ringan ( lengkap )

1186.88

m2

2

A.4.5.2.2 Atap genteng keramik glasur

3 4 5 6 7

A.4.5.2.5 A.4.4.1.8a A.5.1.1.31 A.4.6.1.21 A.4.5.2.37

Bubungan genteng keramik glasur Ornamen puncak atap Corong talang ø 3" PVC Listplank ky bengkirai 2X2/20 Flashing atap

1088.623

m2

2.41 6 68 266.8 266.8

m bh

Vol

Sat.

m' m' m'

B. Pekerjaan Struktur dan Atap C. Pekerjaan Finishing Arsitektur No a. I

Kode

Uraian Pekerjaan PEK. FINISHING ARSITEKTUR LT. 1 : PEK. PONDASI BATU BELAH :

175.596

m3

A.3.2.1.9 Aanstamping

94.99

m3

3

A.2.3.1.11 Urug pasir bwh pondasi + urug pasir bwh rolag

17.59

m3

4

A.2.3.1.9 Urugan tanah peninggian bangunan t = 60 cm

764.904

m3

6.3

m2

1

A.3.2.1.4 Pondasi batu belah 1:6

2

II

PEK. PAS. BT. BATA / PLESTERAN :

1

A.4.4.1.2 Pas. rollag 1:3

2

A.4.4.1.8 Pas. bt. bata 1:3

556.2

m2

3

A.4.4.1.11 Pas. bt. bata 1:6

1334.02

m2

4

A.4.4.2.3 Plesteran 1:3

1112.4

m2

5

A.4.4.2.6 Plesteran 1:6

2668.04

m2

6

A.4.4.2.3 Plesteran beton

99.6 21.174 816 274.6

m2

928.6

m'

74.192

m2

10.01 59 4 2 156

m2

7 8 9

Beton praktis sloof Beton praktis kolom Beton praktis balok latei

III 1

PEK. PAS. KOSEN : A.4.2.1.11 Kosen aluminium 4"

2

A.4.6.2.17 Kaca bening 5 mm

3

Kaca raam jendela 5 mm

4 5 6 7

A.4.6.2.2 Kunci tanam A.4.6.2.2 Floor hinges Kunci raam alluminium A.4.6.2.5 Engsel pintu

8

A.4.6.1.5 Daun pintu double teakwood

9 10

A.4.6.1.5a Pintu PVC lengkap kunci,engsel,kusen Pintu raam alluminium

11

A.4.2.1.9 Sun screen hollow finish cat

12 13 14 15

Raam jendela alluminium A.4.6.2.6 Engsel jendela A.4.6.2.11 Grendel Raam skor

27.84 27 2 177.4 920 86 109 109

m' m' m'

bh unit unit bh

m2 unit unit

m2 m' bh bh bh

16 17 18

A.4.2.1.4 Pintu shaft besi 40/60 ( lengkap ) A.4.7.1.16 Railing tangga pipa hitam finish cat Lt. 1 ke Lt. 2 A.4.7.1.16 Railing depan tralis besi finish cat lt. canopy

IV

2 225.63 41

bh m' m'

PEK. PLAFOND :

1

A.4.4.2.27 Plafond exspose aci

135.65

m2

2

A.4.5.1.1 Plafond asbes plat

614.24

m2

3

A.4.5.1.9 List tepi kayu profil

909

m'

V

PEK. PASANG LANTAI DAN DINDING :

m3

1

A.2.3.1.9 Urug pasir bawah lantai

79.68

2

A.4.1.1.1 Lantai rabat beton tritisan

17.83

m3

3

A.4.4.3.36 Lantai keramik 20x20 cm lavatory

78.39

m2

4

A.4.4.3.54 Dinding keramik 20x25 cm Lavatory

188.96

m2

5

A.4.4.3.34 Lt. keramik warna 40/40 cm

660.625

m2

6

A.4.4.3.34 Lantai keramik warna u.tangga 40/40 cm

m2

7

A.4.4.3.39 Plint lantai jeglok finish cat minyak

29.8 558.7

8

A.4.4.3.58 Batu tempel dinding canopy

m2

9

A.4.5.1.9a Nosing tangga

20.39 34.38

106 67 2 27 56 28 53

bh bh bh bh bh bh bh

27 27 53 4 27 27

bh bh bh bh bh bh

VI 1 2 3 4 5 6 7 VIII 1 2 3 4 5 6

IX

A.4.5.2.1 A.4.5.2.2 A.4.5.2.3 A.4.5.2.4 A.4.5.2.5 A.4.5.2.6 A.4.5.2.7

PEK. PENERANGAN : Lampu SL 18 W Down light SL 18 W Lampu baret 40 W Ceiling fan Stop kontak 200 W Saklar tunggal Saklar ganda

A.5.1.1.2 A.5.1.1.14 A.5.1.1.19 A.5.1.1.12 A.5.1.1.7 A.4.6.2.18

PEK.SANITAIR : Closet jongkok warna tua Saringan air ( floor drain ) Kran air Meja pantry + wash bak Bak mandi Fiber Kaca cermin 40x60 tepi dibevel

m' m'

PEK. CAT-CATAN :

1

A.4.7.1.10 Cat tembok

2047.948

m2

2

A.4.7.1.10 Cat plafond

706.38

m2

3

A.4.7.1.7 Pelituran Daun Pintu

90.72

m2

PEK. FINISHING ARSITEKTUR LT. 1 b.

PEK.FINISHING ARSITEKTUR LT.2 :

I

PEK. PAS.BT.BATA/PLESTERAN,BETON PRAKTIS :

1

A.4.4.1.8 Pas. bt. bata 1:3

208.68

m2

2

A.4.4.1.11 Pas. bt. bata 1:6

1348.71

m2

3

A.4.4.2.3 Plesteran 1:3

417.36

m2

4

A.4.4.2.6 Plesteran 1:6

2697.42

m2

5

A.4.4.2.3 Plesteran beton

225.6 344 259.3

m2

710 517.2

m' m'

6 7

Beton praktis kolom Beton praktis balok latei

m' m'

II 1 2

PEK. PAS. KOSEN : A.4.2.1.11 Kosen aluminium 4" Raam jendela alluminium

3

A.4.6.2.17 Kaca bening 5 mm

101.882

m2

4

A.4.6.2.17a Kaca boven 5 mm

3.9 52 104

m2

87.36 26

m2

5 6

A.4.6.2.2 Kunci tanam A.4.6.2.5 Engsel pintu

7

A.4.6.1.5 Daun pintu double teakwood

8

A.4.6.1.5a Pintu PVC lengkap kunci,engsel,kusen

9

A.4.2.1.9 Sun screen hollow finish cat

10 11 12

A.4.6.2.6 Engsel jendela A.4.6.2.11 Grendel Raam skor

III

PEK. PLAFOND :

1

A.4.5.1.1 Plafond asbes plat

2

A.4.5.1.9 List tepi kayu profil

IV

bh bh unit

25.48 384 96 18

m2

665.57 866.95

m2

bh bh bh

m'

PEK. PASANG LANTAI DAN DINDING :

1

A.4.4.3.36 LT keramik 20x20 cm lavatory

58.44

m2

2

A.4.4.3.54 Dinding keramik 20x25 cm lavatory

249.6

m2

3

A.4.4.3.34 Lt. keramik 40/40 cm

m2

4

A.4.4.3.39 Plint lantai jeglok finish cat minyak

511.86 315

5

A.4.7.1.10 Water proofing R lavatory

249.6

m2

104 54 0 26 54 24 52

bh bh bh bh bh bh bh

26

bh

V 1 2 3 4 5 6 7

PEK. PENERANGAN : Lampu SL 18 W Down light SL 18 W Lampu baret 40 W Ceiling fan Stop kontak 200 W Saklar tunggal Saklar ganda

A.4.5.2.1 A.4.5.2.2 A.4.5.2.3 A.4.5.2.4 A.4.5.2.5 A.4.5.2.6 A.4.5.2.7

VI 1

PEK.SANITAIR : A.5.1.1.2 Closet jongkok warna tua

m'

2 3 4 5 6

A.5.1.1.14 A.5.1.1.19 A.5.1.1.12 A.4.6.2.18 A.5.1.1.7

IX

26 52 0 26 26

Saringan air ( floor drain ) Kran air Meja pantry + wash bak Kaca cermin 40x60 tepi dibevel Bak mandi Fiber

bh bh bh bh bh

PEK. CAT-CATAN :

1

A.4.7.1.10 Cat tembok

2987.4

m2

2

A.4.7.1.10 Cat plafond

706.38

m2

3

A.4.7.1.7 Pelituran Daun Pintu

87.36

m2

4

A.4.7.1.4 Cat listplank kayu

67.68

m2

Vol

Sat.

PEK. FINISHING ARSITEKTUR LT. 2 C. Pekerjaan Finishing Arsitektur D. Pekerjaan Halaman dan Bangunan Penunjang No a. 1 2 3 b.

Kode

Uraian Pekerjaan

PEK. SALURAN A.5.1.1.35a Saluran terbuka U 20 A.5.1.1.35 Saluran buis beton ø 20 A.5.1.1.16 Bak kontrol 45x45

171.45 2.073 33

m' m' bh

36.682

m3

SEPTICTANK + PERESAPAN (8 UNIT)

1

A.2.3.1.3 Galian tanah

2

A.2.3.1.9 Urugan tanah kembali

10.14

m3

3

A.2.3.1.11 Pasir urug

2.208

m3

4

A.3.2.1.9 Aanstamping

15.064

m3

12.64

m3

117.395

m2

234.79 8 13

m2

5

Beton bertulang (plat dasar,tutup)

6

A.4.4.1.8 Dinding bata 1:3

7

A.4.4.2.3 Plesteran 1:3

8 9

A.5.1.1.25 Pipa hawa ø 1½" GIP A.5.1.1.32 Pipa PVC dia.4"

10

A.2.3.1.13 Ijuk

1.295

m2

11

A.2.3.1.11a Kerikil+batu pecah

0.365

m3

12

A.2.3.1.14 Sirtu

4.8

m3

bh bt

8 Septictank = D. Pekerjaan Halaman dan Bangunan Penunjang A. Pekerjaan Persiapan B. Pekerjaan Struktur dan Atap C. Pekerjaan Finishing Arsitektur D. Pekerjaan Halaman dan Bangunan Penunjang Jumlah Dibulatkan PPn 10%

Total

Harga Satuan (Rp) 13,750.00 135,588.20 13,750,000.00 1,000,000.00 2,200,000.00

Jumlah Harga (Rp)

Jumlah (Rp)

15,519,350.00 18,548,465.76 13,750,000.00 1,000,000.00 2,200,000.00

Bobot 0.19440 0.23234 0.17224 0.01253 0.02756

51,017,815.76 51,017,815.76

Harga Satuan (Rp)

Jumlah Harga (Rp)

Jumlah (Rp)

93,995.00

132,479,842.83

1.65948

15,583.33

7,321,237.00

0.09171 139,801,079.83

257,812.50

27,214,687.50

0.34090

896,917.59

25,750,504.01

0.32256

3,132,742.69

106,763,871.01

1.33735

5,796,978.97

204,401,478.33

2.56039

4,327,839.68

208,991,378.23

2.61788

8,089,599.31

296,807,398.70

3.71789

5,690,669.63

364,942,643.15

4.57137

6,835,121.83

133,011,470.85

1.66614

6,202,881.27

505,646,475.34

6.33386

12,827,500.20

26,296,375.40

0.32940

4,269,676.32

2,177,534.92

0.02728

7,249,775.96

57,708,216.62

0.72287

25,910.50

310,407.79

0.00389 1,960,022,441.86

18,960,699.34

211,411,797.66

2.64820

2,324,430.11

22,546,972.10

0.28243

6,581,466.10

26,128,420.41

0.32729

25,910.50

1,029,165.06

0.01289 261,116,355.23

149,941.00

177,961,974.08

2.22920

138,935.00

151,247,836.51

1.89457

112,618.00 35,475.00 58,384.33 149,380.00 64,570.50

271,409.38 212,850.00 3,970,134.44 39,854,584.00 17,227,409.40

0.00340 0.00267 0.04973 0.49923 0.21580 390,746,197.81 2,751,686,074.72

Harga Satuan (Rp)

Jumlah Harga (Rp)

Jumlah (Rp)

892,171.50

156,661,746.71

1.96239

533,346.00

50,662,536.54

0.63461

237,050.00

4,169,709.50

0.05223

15,583.33

11,919,754.00

0.14931 223,413,746.75

235,028.75

1,480,681.13

0.01855

113,177.35

62,949,242.07

0.78852

109,308.10

145,819,191.56

1.82657

60,840.78

67,679,283.67

0.84777

58,345.98

155,669,408.48

1.94996

60,840.78

6,059,741.69

0.07591

200,414.50 176,203.51 286,262.58

4,243,576.62 143,782,064.16 78,607,704.47

0.05316 1.80105 0.98466 666,290,893.85

110,542.30

102,649,579.78

1.28582

127,710.00

9,475,060.32

0.11869

134,420.00

1,345,544.20

0.01685

175,835.00 1,374,835.00 178,035.00 26,152.50

10,374,265.00 5,499,340.00 356,070.00 4,079,790.00

0.12995 0.06889 0.00446 0.05110

755,287.50

21,027,204.00

0.26339

225,940.00 110,542.30

6,100,380.00 221,084.60

0.07641 0.00277

458,320.00

81,305,968.00

1.01846

109,230.55 17,435.00 33,880.00 26,422.00

100,492,106.00 1,499,410.00 3,692,920.00 2,879,998.00

1.25879 0.01878 0.04626 0.03608

810,590.00 492,726.30 36,107.50

1,621,180.00 111,173,835.07 1,480,407.50

0.02031 1.39259 0.01854 465,274,142.47

33,013.75

4,478,315.19

0.05610

28,997.00

17,811,117.28

0.22311

15,994.00

14,538,546.00

0.18211 36,827,978.47

237,050.00

18,888,144.00

0.23660

957,528.00

17,072,724.24

0.21386

205,584.50

16,115,768.96

0.20187

232,754.50

43,981,290.32

0.55092

210,619.51

139,140,513.79

1.74291

210,619.51

6,276,461.40

0.07862

12,828.20

7,167,115.34

0.08978

261,208.75

5,326,046.41

0.06672

87,208.00

2,998,211.04

0.03756 256,966,275.50

54,252.00 156,552.00 1,273,052.00 259,100.00 46,420.00 43,120.00 46,970.00

5,750,712.00 10,488,984.00 2,546,104.00 6,995,700.00 2,599,520.00 1,207,360.00 2,489,410.00

0.07203 0.13139 0.03189 0.08763 0.03256 0.01512 0.03118 32,077,790.00

602,745.00 40,535.00 75,524.63 341,605.00 1,161,600.00 351,560.00

16,274,115.00 1,094,445.00 4,002,805.39 1,366,420.00 31,363,200.00 9,492,120.00

0.20385 0.01371 0.05014 0.01712 0.39286 0.11890 63,593,105.39

19,423.80

39,778,932.36

0.49828

19,423.80

13,720,583.84

0.17187

54,562.20

4,949,882.78

0.06200 58,449,398.99 1,802,893,331.42

113,177.35

23,617,849.40

0.29584

109,308.10

147,424,927.55

1.84668

60,840.78

25,392,507.94

0.31807

58,345.98

157,383,613.37

1.97143

60,840.78

13,725,679.97

0.17193

176,203.51 286,262.58

60,614,007.44 74,227,886.99

0.75927 0.92980 502,386,472.66

110,542.30 109,230.55

78,485,033.00 56,494,040.46

0.98312 0.70766

127,710.00

13,011,350.22

0.16298

134,420.00

524,238.00

0.00657

175,835.00 26,152.50

9,143,420.00 2,719,860.00

0.11453 0.03407

755,287.50

65,981,916.00

0.82651

225,940.00

5,874,440.00

0.07358

458,320.00

11,677,993.60

0.14628

17,435.00 33,880.00 26,422.00

6,695,040.00 3,252,480.00 475,596.00

0.08386 0.04074 0.00596 254,335,407.28

28,997.00

19,299,533.29

0.24175

15,994.00

13,865,998.30

0.17369 33,165,531.59

205,584.50

12,014,358.18

0.15049

232,754.50

58,095,523.20

0.72772

210,619.51

107,807,702.39

1.35043

12,828.20

4,040,883.00

0.05062

26,180.00

6,534,528.00

0.08185 188,492,994.77

54,252.00 156,552.00 1,273,052.00 259,100.00 46,420.00 43,120.00 46,970.00

5,642,208.00 8,453,808.00 6,736,600.00 2,506,680.00 1,034,880.00 2,442,440.00

0.07068 0.10589 0.00000 0.08438 0.03140 0.01296 0.03059 26,816,616.00

602,745.00

15,671,370.00

0.19630

40,535.00 75,524.63 341,605.00 351,560.00 1,161,600.00

1,053,910.00 3,927,280.76 9,140,560.00 30,201,600.00

0.01320 0.04919 0.00000 0.11450 0.37831 59,994,720.76

19,423.80

58,026,660.12

0.72686

19,423.80

13,720,583.84

0.17187

54,562.20

4,766,553.79

0.05971

40,766.00

2,759,042.88

0.03456 79,272,840.64 1,144,464,583.70 2,947,357,915.12

Harga Satuan (Rp) 93,995.00 15,583.33 237,050.00

Jumlah Harga (Rp)

Jumlah (Rp)

16,115,442.75 32,304.25 7,822,650.00

0.20187 0.00040 0.09799 23,970,397.00

93,995.00

3,447,924.59

0.04319

15,583.33

158,015.00

0.00198

237,050.00

523,406.40

0.00656

533,346.00

8,034,324.14

0.10064

1,077,191.70

13,615,703.09

0.17055

113,177.35

13,286,455.00

0.16643

60,840.78

14,284,806.74

0.17894

22,121.00 61,336.00

176,968.00 797,368.00

0.00222 0.00999

60,225.00

77,991.38

0.00098

606,650.00

221,427.25

0.00277

257,812.50

1,237,500.00

0.01550

Jumlah 8 Septictank =

ap ktur Penunjang

55,861,889.59 55,861,889.59 Rp Rp Rp Rp Rp Rp Rp

55,861,889.59 79,832,286.59 51,017,815.76 2,751,686,074.72 2,947,357,915.12 79,832,286.59 5,829,894,092.18 5,830,000,000.00 583,000,000.00

1% 47% 51% 1% 100%

Rp

6,413,000,000.00

A. Pekerjaan Persiapan B. Pekerjaan Struktur dan Atap C. Pekerjaan Finishing Arsitektur D. Pekerjaan Halaman dan Bangunan Penunjang Jumlah Dibulatkan PPn 10% Total

Rp 51,017,815.76 ### ### Rp 79,832,286.59 ### ### Rp583,000,000.00 ###

No I 1 2 II 1 2 III a 1 2 3

4

5

6

7

8

9

10

11

12

URAIAN PEKERJAAN PEKERJAAN PERSIAPAN Pembersihan lapangan Pengukuran dan bouwplank PEKERJAAN TANAH Galian Tanah Urugan Kembali PEKERJAAN BETON BERTULANG STRUKTUR LANTAI 1 Sirtu Lantai Kerja Beton Balok RIB Penulangan Ulir Penulangan Polos Beton Balok Sloof Penulangan Ulir Penulangan Polos Bekisting Beton Plat Pondasi Bekisting Penulangan Polos Beton Kolom Struktur Bekisting Penulangan Ulir Penulangan Polos Beton Balok Induk Bekisting Penulangan Ulir Penulangan Polos Beton Balok Anak Bekisting Penulangan Ulir Penulangan Polos Beton Plat Lantai Bekisting Penulangan Polos Beton Plat Daak Canopy Bekisting Penulangan Polos Beton Listplank Bekisting Penulangan Polos Tangga Beton Bekisting Penulangan Ulir Penulangan Polos

VOLUME

KOEFISIEN Pekerja

Mandor

Tk. Kayu

Tk. Besi

1128.68 136.8

0.1 0.1

0.05 0.05

0 0.1

0 0

1409.435 469.812

1.05 0.5

0.067 0.05

0 0

0 0

105.56 28.71 34.08 329.278 208.055 35.26 518.258 268.504 352.72 48.29 401.42 680.56 36.69 437.25 500.13 234.877 64.13 524.53 387.175 329.459 19.46 210.19 159.1 78.145 81.518 407.75 1761.055 2.05 56.75 5.57 0.51 5.28 0.301 7.96 77.86 36.51 133.268

0.25 1.65 1.65 0.007 0.007 1.65 0.007 0.007 0.52 1.65 0.52 0.007 1.65 0.66 0.007 0.007 1.65 0.66 0.007 0.007 1.65 0.66 0.007 0.007 1.65 0.66 0.007 1.65 0.66 0.007 1.65 0.66 0.007 1.65 0.66 0.007 0.007

0.025 0.083 0.083 0.004 0.004 0.083 0.004 0.004 0.026 0.083 0.026 0.004 0.083 0.033 0.004 0.004 0.083 0.033 0.004 0.004 0.083 0.033 0.004 0.004 0.083 0.033 0.004 0.083 0.033 0.004 0.083 0.033 0.004 0.083 0.033 0.004 0.004

0 0 0 0 0 0 0 0 0.26 0 0.26 0 0 0.33 0 0 0 0.33 0 0 0 0.33 0 0 0 0.33 0 0 0.33 0 0 0.33 0 0 0.33 0 0

0 0 0 0.07 0.07 0 0.07 0.07 0 0 0 0.07 0 0 0.07 0.07 0 0 0.07 0.07 0 0 0.07 0.07 0 0 0.07 0 0 0.07 0 0 0.07 0 0 0.07 0.07

13 b 1

4 IV 1 2 3 4 5 6 7

Water Proofing Daak Canopy STRUKTUR LANTAI 2 Beton Kolom Struktur Bekisting Penulangan Ulir Beton Balok Ring Atas Bekisting Penulangan Ulir Beton Plat Daak Bekisting Penulangan Ulir Water Proofing Daak PEKERJAAN RANGKA DAN ATAP Kuda - kuda Baja Ringan (lengkap) Atap Genteng Keramik Glasur Bubungan Genteng Keramik Glasur Ornamen Puncak Atap Corong Talang ø3" PVC Listplank Kayu Bengkirai 2x2/20 Flashing Atap

C

PEKERJAAN FINISHING ARSITEKTUR

2

3

No I a 1 2

URAIAN PEKERJAAN

11.98 11.15 437.25 291.015 9.7 125.35 77.85 3.97 39.72 42.192 39.72

0.02 0 1.65 0.66 0.007 1.65 0.297 0.007 1.65 0.007 0.007 0.02

0.003 0 0.083 0.033 0.004 0.083 0.015 0.004 0.083 0.001 0.004 0.003

0 0 0 0.33 0 0 0.033 0 0 0 0 0

0 0 0 0 0.07 0 0.033 0.07 0 0 0.07 0

1186.88 1088.623 2.41 6 68 266.8 266.8

0.2 0.15 0.4 0.3 0.081 0.1 0.25

0.05 0.008 0.002 0.015 0.004 0.005 0.013

0 0.075 0.2 0 0 0.02 0.15

0.45 0 0 0 0 0 0

VOLUME

KOEFISIEN Pekerja

Mandor

Tk. Kayu

Tk. Besi

1.5 0.78

0.075 0.039

0 0

0 0

764.904

0.3 0.3

0.01 0.01

0 0

0 0

6.3 556.2 1334.02 1112.4 2668.04 99.6 21.174 816 274.6

0.6 0.3 0.3 0.3 0.3 0.3 1.65 1.65 1.65

0.03 0.015 0.015 0.015 0.015 0.015 0.083 0.083 0.083

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

928.6 74.192 10.01 59 4

0.043 0.015 0.015 0.01 0.01

0.0021 0.00075 0.00075 0.005 0.005

0 0.15 0.15 0.5 0

0.043 0 0 0 0.5

3

PEKERJAAN FINISHING ARSITEKTUR LA Pekerjan Pondasi Batu Belah Pondasi Batu Belah 1:6 175.596 Aanstamping 94.99 Urug Pasir Bawah Pondasi + Urug 17.59 Pasir Bawah Rolag

4 b 1 2 3 4 5 6 7 8 9 c 1 2 3 4 5

Urugan Tanah Peninggian Bangunan Pekerjaan Pas. Bata / Plesteran Pas. Rollag 1:3 Pas. Batu Bata 1:3 Pas. Batu Bata 1:6 Plesteran 1:3 Plesteran 1:6 Plesteran Beton Beton Praktis Sloof Beton Praktis Kolom Beton Praktis Balok Latei Pekerjaan Pas. Kosen Kosen Aluminium 4" Kaca Bening 5mm Kaca Raam Jendela Kunci Tanam Floor Hinges

6 7 8 9 10 11 12 13 14 15 16 17 18 d 1 2 3 e 1 2 3 4 5 6 7 8 9 f 1 2 3 4 5 6 7 g 1 2 3 4 5 6 h 1 2 3 II a

Kunci Raam Aluminium 2 Engsel Pintu 156 Daun Pintu Double Teakwood 27.84 Pintu PVC lengkap, engsel, kunci, kuse 27 Pintu Raam Aluminium 2 Sun Screen Hollow Finish Cat 177.4 Raam Jendela Aluminium 920 Engsel Jendela 86 Gerendel 109 Raam Skor 109 Pintu Shaft Besi 40/60 (lengkap) 2 Ralling Tangga Pipa Hitam Finish Cat 225.63 Ralling Depan Tralis Besi Finish Cat 41 Pekerjaan Plafond Plafond Expose Aci 135.65 Plafond Asbes Plat 614.24 List Tepi Kayu Profil 909 Pek. Pasang Lantai Dan Dinding Urug Pasir Bawah Lantai 79.68 Lantai Rabat Beton Tritisan 17.83 Lantai Keramik 20x20 cm Lavatory 78.39 Dinding Keramik 20x25 cm Lavatory 188.96 Lt. Keramik Warna 40/40 cm 660.625 Lt. Keramik Warna U. Tangga 40/40cm 29.8 Plint Lantai Jeglok Finish Cat Minyak 558.7 Batu Tempel Dinding Canopy 20.39 Nosing Tangga 34.38 Pekerjan Penerangan Lampu SL 18W 106 Down Light SL 18W 67 Lampu Baret 40W 2 Ceiling Fan 27 Stop Kontak 200W 56 Saklar Tunggal 28 Saklar Ganda 53 Pekerjaan Sanitair Closet Jongkok Warna Tua 27 Saringan air (floor drain) 27 Kran air 53 Meja pantry + wash bak 4 Bak Mandi Fiber + Keramik 20/25 27 Kaca Cermin 40x60 Tepi Dibevel 27 Pekerjaan Cat - Catan Cat Tembok 2047.948 Cat Plafond 706.38 Pelituran Daun Pintu 90.72 PEKERJAAN FINISHING ARSITEKTUR LA Pek. Pas. Bata/Plesteran, Kolom Prakris

0.01 0.015 1 1 0.043 0.08 0.043 0.01 0.02 0.015 1.05 0.043 0.043

0.005 0.0075 0.05 0.05 0.0021 0.004 0.0021 0.005 0.001 0.008 0.052 0.0021 0.0021

0 0.15 3 0 0 0 0 0 0 0 0 0 0

0.1 0 0 0 0.043 0.8 0.043 0.1 0.2 0.15 1.05 0.043 0.043

0.2 0.03 0.05

0.01 0.004 0.003

0 0.07 0.05

0 0 0

0.25 1.65 0.7 0.9 0.7 0.7 0.02 0.7 0.05

0.025 0.083 0.035 0.045 0.035 0.035 0.003 0.035 0.003

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0.12 0.12 0.12 0.15 0.1 0.1 0.1

0.006 0.006 0.006 0.075 0.005 0.005 0.005

0 0 0 0 0 0 0

0 0 0 0 0 0 0

1 0.01 0.01 0.03 3 0.015

0.16 0.005 0.005 0.015 0.9 0.00075

0 0 0 0 0 0.15

0 0 0 0 0 0

0.02 0.02 0.04

0.003 0.003 0.003

0 0 0

0 0 0

1 2 3 4 5 6 7 b 1 2 3 4 5 6 7 8 9 10 11 12 c 1 2 d 1 2 3 4 5 e 1 2 3 4 5 6 7 f 1 2 3 4 5 6 g 1 2 3

Pas. Batu Bata 1:3 Pas, Batu Bata 1:6 Plesteran 1:3 Plesteran 1:6 Plesteran beton Beton Praktis Kolom Beton Praktis Balok Latei Pekerjaan Pasangan Kusen Kusen Aluminium 4' Raam Jendela Aluminium Kaca Bening 5mm Kaca Boven 5mm Kunci Tanam Engsel Pintu Daun Pintu Double Teakwood Pintu PVC lengkap kunci engsel, kusen Sun Screen Hollow Finish Cat Engsel Jendela Gerendel Raam Skor Pekerjaan Plafond Plafond Asbes Plat List Tepi Kayu Profil Pek. Pas. Lantai dan Dinding Lt. Keramik 20x20cm Lavatory Dinding Keramik 20cmx25cm Lavatory Lantai Keramik Warna 40/40cm Plint Lantai Jeglok Finish Cat Minyak Waterproofing R Lavatory Pekerjaan Peneragan Lampu SL 18W Down Light SL 18W Lampu Baret 40W Ceiling Fan Stop Kontak 200W Saklar Tunggal Saklar Ganda Pekeraan Sanitasi Closet Jongkok Warna Tua Saringan air (floor drain) Kran air Meja pantry + wash bak Kaca Cermin 40x60 Tepi Dibevel Bak Mandi Fiber + Keramik 20/25 Pekerjaan Cat-Catan Cat Tembok Cat Plafond Pelituran Daun Pintu

208.68 1348.71 417.36 2697.42 225.6 344 259.3

0.3 0.3 0.3 0.3 0.3 1.65 1.65

0.015 0.015 0.015 0.015 0.015 0.083 0.083

0 0 0 0 0 0 0

0 0 0 0 0 0 0

710 517.2 101.882 3.9 52 104 87.36 26 25.48 384 96 18

0.043 0.043 0.015 0.015 0.01 0.015 1 1 0.08 0.01 0.02 0.015

0.0021 0.0021 0.00075 0.00075 0.005 0.0075 0.05 0.05 0.004 0.005 0.001 0.008

0 0 0.15 0.15 0.5 0.15 3 0 0 0 0 0

0.043 0.043 0 0 0 0 0 0 0.8 0.1 0.2 0.15

665.57 866.95

0.03 0.05

0.004 0.003

0.07 0.05

0 0

58.44 249.6 511.86 315 249.6

0.7 0.9 0.7 0.02 0.02

0.035 0.045 0.035 0.003 0.003

0 0 0 0 0

0 0 0 0 0

104 54 0 26 54 24 52

0.12 0.12 0.12 0.15 0.1 0.1 0.1

0.006 0.006 0.006 0.075 0.005 0.005 0.005

0 0 0 0 0 0 0

0 0 0 0 0 0 0

26 26 52 0 26 26

1 0.01 0.01 0.03 0.015 3

0.16 0.005 0.005 0.015 0.00075 0.9

0 0 0 0 0.15 0

0 0 0 0 0 0

2987.4 706.38 87.36

0.02 0.02 0.04

0.003 0.003 0.003

0 0 0

0 0 0

4

Cat Listplank Kayu

67.68

0.07

0.003

0

0

C No I 1 2 3 II 1 2 3 4 5 6 7 8 9 10 11 12

URAIAN PEKERJAAN PEKERJAAN SALURAN Saluran terbuka U 20 Saluran buis beton ø 20 Bak kontrol 45x45 PEKERJAAN SALURAN Galian tanah Urugan tanah kembali Pasir urug Aanstamping Beton bertulang (plat dasar,tutup) Dinding bata 1:3 Plesteran 1:3 Pipa hawa ø 1½" GIP Pipa PVC dia.4" Ijuk Kerikil+batu pecah Sirtu

VOLUME

KOEFISIEN Pekerja

Mandor

Tk. Kayu

Tk. Besi

171.45 2.073 33

0.14 0.14 3.2

0.007 0.007 0.016

0 0 0

0 0 0

36.682 10.14 2.208 15.064 12.64 117.395 234.79 8 13 1.295 0.365 4.8

1.05 0.5 0.3 0.78 1.65 0.3 0.3 0.036 0.036 0.15 0.3 0.25

0.067 0.05 0.01 0.039 0.083 0.015 0.015 0.002 0.002 0.015 0.01 0.025

0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0

sloof kolom 1.650 1.650 0.007 0.660 0.520 0.007 2.177 2.317

sloof 1.650 0.007 0.520 2.177

0.083 0.004 0.026 0.113

kolom 1.650 0.660 0.000 0.007 2.317

0.083 0.033 0.000 0.004 0.120

1.650 0.007 0.070 1.727

KOEFISIEN Tk. Batu

Tk. Cat

Tk. Las

KOEFISIEN

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0.275 0.275 0 0 0.275 0 0 0 0.275 0 0 0.275 0 0 0 0.275 0 0 0 0.275 0 0 0 0.275 0 0 0.275 0 0 0.275 0 0 0.275 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Tk. Listrik K. Tukang

Pekerja

Mandor

Tk. Kayu

Tk. Besi

0 0.01

112.868 13.68

56.434 6.84

0 13.68

0 0

0 0

0 0

1479.907 234.906

94.432 23.491

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0.028 0.028 0.007 0.007 0.028 0.007 0.007 0.026 0.028 0.026 0.007 0.028 0.033 0.007 0.007 0.028 0.033 0.007 0.007 0.028 0.033 0.007 0.007 0.028 0.033 0.007 0.028 0.033 0.007 0.028 0.033 0.007 0.028 0.033 0.007 0.007

26.390 47.372 56.232 2.305 1.456 58.179 3.628 1.880 183.414 79.679 208.738 4.764 60.539 288.585 3.501 1.644 105.815 346.190 2.710 2.306 32.109 138.725 1.114 0.547 134.505 269.115 12.327 3.383 37.455 0.039 0.842 3.485 0.002 13.134 51.388 0.256 0.933

2.639 2.383 2.829 1.317 0.832 2.927 2.073 1.074 9.171 4.008 10.437 2.722 3.045 14.429 2.001 0.940 5.323 17.309 1.549 1.318 1.615 6.936 0.636 0.313 6.766 13.456 7.044 0.170 1.873 0.022 0.042 0.174 0.001 0.661 2.569 0.146 0.533

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 91.707 0.000 104.369 0.000 0.000 144.293 0.000 0.000 0.000 173.095 0.000 0.000 0.000 69.363 0.000 0.000 0.000 134.558 0.000 0.000 18.728 0.000 0.000 1.742 0.000 0.000 25.694 0.000 0.000

0.000 0.000 0.000 23.049 14.564 0.000 36.278 18.795 0.000 0.000 0.000 47.639 0.000 0.000 35.009 16.441 0.000 0.000 27.102 23.062 0.000 0.000 11.137 5.470 0.000 0.000 123.274 0.000 0.000 0.390 0.000 0.000 0.021 0.000 0.000 2.556 9.329

0 0 0.275 0 0 0.275 0.033 0 0.275 0.076 0 0

0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0

0 0 0.028 0.033 0.007 0.028 0.01 0.007 0.028 0.008 0.007 0

0.240

0.036

0.000

0.000

18.398 288.585 2.037 16.005 37.229 0.545 6.551 0.278 0.295 0.794

0.925 14.429 1.164 0.805 1.880 0.311 0.330 0.040 0.169 0.119

0.000 144.293 0.000 0.000 4.137 0.000 0.000 0.000 0.000 0.000

0.000 0.000 20.371 0.000 4.137 5.450 0.000 0.000 2.953 0.000

0 0 0 0 0.135 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0.01 0.008 0.02 0 0.0135 0.02 0.015

237.376 163.293 0.964 1.800 5.508 26.680 66.700

59.344 8.709 0.005 0.090 0.272 1.334 3.468

0.000 81.647 0.482 0.000 0.000 5.336 40.020

534.096 0.000 0.000 0.000 0.000 0.000 0.000

KOEFISIEN Tk. Batu

KOEFISIEN Tk. Cat

Tk. Las

0.75 0.39

0 0

0 0

0 0

0.075 0.039

0 0

0 0

0 0

0 0

0 0

0.2 0.1 0.1 0.15 0.15 0.15 0.275 0.275 0.275

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

Tk. Listrik K. Tukang

Pekerja

Mandor

Tk. Kayu

Tk. Besi

263.394 74.092

13.170 3.705

0.000 0.000

0.000 0.000

5.277

0.176

0.000

0.000

229.471

7.649

0.000

0.000

0.02 0.01 0.01 0.015 0.015 0.015 0.028 0.028 0.028

3.780 166.860 400.206 333.720 800.412 29.880 34.937 1346.400 453.090

0.189 8.343 20.010 16.686 40.021 1.494 1.757 67.728 22.792

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.0043 0.015 0.015 0.01 0.01

39.930 1.113 0.150 0.590 0.040

1.950 0.056 0.008 0.295 0.020

0.000 11.129 1.502 29.500 0.000

39.930 0.000 0.000 0.000 2.000

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0

0.01 0.015 0.3 0 0.0043 0.08 0.0043 0.01 0.02 0.015 0.105 0.0043 1.03

0.020 2.340 27.840 27.000 0.086 14.192 39.560 0.860 2.180 1.635 2.100 9.702 1.763

0.010 1.170 1.392 1.350 0.004 0.710 1.932 0.430 0.109 0.872 0.104 0.474 0.086

0.000 23.400 83.520 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.200 0.000 0.000 0.000 0.086 141.920 39.560 8.600 21.800 16.350 2.100 9.702 1.763

0.1 0 0

0 0 0

0 0 0

0 0 0

0.01 0.007 0.005

27.130 18.427 45.450

1.357 2.457 2.727

0.000 42.997 45.450

0.000 0.000 0.000

0 0.275 0.35 0.45 0.35 0.35 0 0.35 0

0 0 0 0 0 0 0.063 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0.028 0.035 0.045 0.035 0.035 0.0063 0.035 0

19.920 29.420 54.873 170.064 462.438 20.860 11.174 14.273 1.719

1.992 1.480 2.744 8.503 23.122 1.043 1.676 0.714 0.103

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0.12 0.12 0.12 0.3 0.2 0.2 0.2

0.012 0.012 0.012 0.03 0.02 0.02 0.02

12.720 8.040 0.240 4.050 5.600 2.800 5.300

0.636 0.402 0.012 2.025 0.280 0.140 0.265

0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000

1.5 0.1 0.4 0.3 4.5 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

1.5 0.01 0.04 0.03 0.05 0.015

27.000 0.270 0.530 0.120 81.000 0.405

4.320 0.135 0.265 0.060 24.300 0.020

0.000 0.000 0.000 0.000 0.000 4.050

0.000 0.000 0.000 0.000 0.000 0.000

0 0 0

0.063 0.063 0.06

0 0 0

0 0 0

0.0063 0.0063 0.016

40.959 14.128 3.629

6.144 2.119 0.272

0.000 0.000 0.000

0.000 0.000 0.000

0.1 0.1 0.15 0.15 0.15 0.275 0.275

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0.01 0.01 0.015 0.015 0.015 0.028 0.028

62.604 404.613 125.208 809.226 67.680 567.600 427.845

3.130 20.231 6.260 40.461 3.384 28.552 21.522

0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000

0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0

0.0043 0.0043 0.015 0.015 0.01 0.015 0.3 0 0.08 0.01 0.02 0.015

30.530 22.240 1.528 0.059 0.520 1.560 87.360 26.000 2.038 3.840 1.920 0.270

1.491 1.086 0.076 0.003 0.260 0.780 4.368 1.300 0.102 1.920 0.096 0.144

0.000 0.000 15.282 0.585 26.000 15.600 262.080 0.000 0.000 0.000 0.000 0.000

30.530 22.240 0.000 0.000 0.000 0.000 0.000 0.000 20.384 38.400 19.200 2.700

0 0

0 0

0 0

0 0

0.007 0.005

19.967 43.348

2.662 2.601

46.590 43.348

0.000 0.000

0.35 0.45 0.35 0 0

0 0 0 0.063 0

0 0 0 0 0

0 0 0 0 0

0.035 0.045 0.035 0.0063 0

40.908 224.640 358.302 6.300 4.992

2.045 11.232 17.915 0.945 0.749

0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0.12 0.12 0.12 0.3 0.2 0.2 0.2

0.012 0.012 0.012 0.03 0.02 0.02 0.02

12.480 6.480 0.000 3.900 5.400 2.400 5.200

0.624 0.324 0.000 1.950 0.270 0.120 0.260

0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000

1.5 0.1 0.4 0.3 0 4.5

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

1.5 0.01 0.04 0.03 0.015 0.05

26.000 0.260 0.520 0.000 0.390 78.000

4.160 0.130 0.260 0.000 0.020 23.400

0.000 0.000 0.000 0.000 3.900 0.000

0.000 0.000 0.000 0.000 0.000 0.000

0 0 0

0.063 0.063 0.06

0 0 0

0 0 0

0.0063 0.0063 0.016

59.748 14.128 3.494

8.962 2.119 0.262

0.000 0.000 0.000

0.000 0.000 0.000

0

0.009

0

0

0.006

4.738

0.203

0.000

0.000

PEKERJAAN HALAMAN DAN BANGUNAN PENUNJANG KOEFISIEN Tk. Batu

KOEFISIEN Tk. Cat

Tk. Las

0.07 0.07 1.15

0 0 0

0 0 0

0 0 0

0 0 0 0.39 0.275 0.1 0.15 0.06 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0

Tk. Listrik K. Tukang

Pekerja

Mandor

Tk. Kayu

Tk. Besi

0.007 0.007 0.011

24.003 0.290 105.600

1.200 0.015 0.528

0.000 0.000 0.000

0.000 0.000 0.000

0 0 0 0.039 0.028 0.01 0.015 0.006 0.006 0 0 0

38.516 5.070 0.662 11.750 20.856 35.219 70.437 0.288 0.468 0.194 0.110 1.200

2.458 0.507 0.022 0.587 1.049 1.761 3.522 0.016 0.026 0.019 0.004 0.120

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.007

0.004

0.000

0.028 0.007 0.026 0.061

0.000

0.028 0.033 0.000 0.007 0.068

0.275 0.070 0.260 0.260

0.070

0.275

0.000

0.000

0.275 0.330

0.330

0.000 0.070 0.070

0.275

0.000

0.000

KOEFISIEN Tk. Batu 0 0

0.000 7.895 9.372 0.000 0.000 9.697 0.000 0.000 0.000 13.280 0.000 0.000 10.090 0.000 0.000 0.000 17.636 0.000 0.000 0.000 5.352 0.000 0.000 0.000 22.417 0.000 0.000 0.564 0.000 0.000 0.140 0.000 0.000 2.189 0.000 0.000 0.000

Tk. Cat

Tk. Las

0 0

0 0

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Tk. Listrik K. Tukang 0 0

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0 1.368

0.000 0.804 0.954 2.305 1.456 0.987 3.628 1.880 9.171 1.352 10.437 4.764 1.027 14.429 3.501 1.644 1.796 17.309 2.710 2.306 0.545 6.936 1.114 0.547 2.283 13.456 12.327 0.057 1.873 0.039 0.014 0.174 0.002 0.223 2.569 0.256 0.933

DURASI

KINERJA SDM Total SDM Pembulatan SDM/Hari

8 2

169.302 35.568

170 36

21.250 18.000

20 7

1574.339 258.397

1575 259

78.750 37.000

2 2 4 3 3 3 3 3 6 9 11 3 5 8 3 3 8 8 3 3 8 4 3 3 8 10 3 5 3 1 2 1 1 3 5 3 2

29.029 58.454 69.387 28.976 18.309 71.789 45.607 23.628 293.463 98.318 333.981 59.889 74.701 461.736 44.011 20.669 130.569 553.904 34.071 28.992 39.621 221.961 14.001 6.877 165.971 430.584 154.973 4.174 59.928 0.490 1.038 5.576 0.026 16.207 82.220 3.213 11.728

30 59 70 29 19 72 46 24 294 99 334 60 75 462 45 21 131 554 35 29 40 222 15 7 166 431 155 5 60 1 2 6 1 17 83 4 12

15.000 29.500 17.500 9.667 6.333 24.000 15.333 8.000 49.000 11.000 30.364 20.000 15.000 57.750 15.000 7.000 16.375 69.250 11.667 9.667 5.000 55.500 5.000 2.333 20.750 43.100 51.667 1.000 20.000 1.000 1.000 6.000 1.000 5.667 16.600 1.333 6.000

0.000

0.000

0.000

0.000

0.000

1

0.276

1

1.000

3.066 0.000 0.000 2.668 4.137 0.000 1.092 3.019 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.312 14.429 2.037 0.272 1.254 0.545 0.111 0.318 0.295 0.000

8 6 3 8 4 3 1 4 3 1

22.701 461.736 25.609 19.749 52.772 6.851 8.083 3.654 3.713 0.914

23 462 26 20 53 7 9 4 4 1

2.875 77.000 8.667 2.500 13.250 2.333 9.000 1.000 1.333 1.000

0.000 0.000 0.000 0.000 9.180 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000

11.869 8.709 0.048 0.000 0.918 5.336 4.002

33 8 2 1 2 4 5

842.685 262.358 1.499 1.890 15.878 38.686 114.190

843 263 2 2 16 39 115

25.545 32.875 1.000 2.000 8.000 9.750 23.000

KOEFISIEN Tk. Batu

Tk. Cat

Tk. Las

131.697 37.046

0.000 0.000

0.000 0.000

0.000 0.000

13.170 3.705

17 4

421.430 118.548

422 119

24.824 29.750

0.000

0.000

0.000

0.000

0.000

3

5.453

6

2.000

0.000

0.000

0.000

0.000

0.000

5

237.120

238

47.600

1.260 55.620 133.402 166.860 400.206 14.940 5.823 224.400 75.515

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.126 5.562 13.340 16.686 40.021 1.494 0.593 22.848 7.689

3 11 12 17 17 3 5 32 13

5.355 236.385 566.959 533.952 1280.659 47.808 43.110 1661.376 559.086

6 237 567 534 1281 48 44 1662 560

2.000 21.545 47.250 31.412 75.353 16.000 8.800 51.938 43.077

0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000

3.993 1.113 0.150 0.590 0.040

2 1 1 1 1

85.803 13.410 1.809 30.975 2.100

86 14 2 31 3

43.000 14.000 2.000 31.000 3.000

Tk. Listrik K. Tukang

DURASI

KINERJA SDM Total SDM Pembulatan SDM/Hari

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.020 2.340 8.352 0.000 0.009 14.192 3.956 0.860 2.180 1.635 0.210 0.970 42.230

1 2 6 3 1 5 2 2 2 1 5 2 1

0.250 29.250 121.104 28.350 0.185 171.014 85.008 10.750 26.269 20.492 4.514 20.848 45.842

1 30 122 29 1 172 86 11 27 21 5 21 46

1.000 15.000 20.333 9.667 1.000 34.400 43.000 5.500 13.500 21.000 1.000 10.500 46.000

13.565 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

1.357 4.300 4.545

1 5 8

43.408 68.181 98.172

44 69 99

44.000 13.800 12.375

0.000 4.903 27.437 85.032 231.219 10.430 0.000 7.137 0.000

0.000 0.000 0.000 0.000 0.000 0.000 35.198 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.499 2.744 8.503 23.122 1.043 3.520 0.714 0.000

1 1 3 7 13 1 3 3 1

21.912 36.302 87.797 272.102 739.900 33.376 51.568 22.837 1.822

22 37 88 273 740 34 52 23 2

22.000 37.000 29.333 39.000 56.923 34.000 17.333 7.667 2.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000

12.720 8.040 0.240 8.100 11.200 5.600 10.600

1.272 0.804 0.024 0.810 1.120 0.560 1.060

2 2 1 2 2 1 2

27.348 17.286 0.516 14.985 18.200 9.100 17.225

28 18 1 15 19 10 18

14.000 9.000 1.000 7.500 9.500 10.000 9.000

40.500 2.700 21.200 1.200 121.500 0.000

0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000

40.500 0.270 2.120 0.120 1.350 0.405

4 1 1 1 4 3

112.320 3.375 24.115 1.500 228.150 4.880

113 4 25 2 229 5

28.250 4.000 25.000 2.000 57.250 1.667

0.000 0.000 0.000

129.021 44.502 5.443

0.000 0.000 0.000

0.000 0.000 0.000

12.902 4.450 1.452

15 7 2

189.026 65.199 10.796

190 66 11

12.667 9.429 5.500

20.868 134.871 62.604 404.613 33.840 94.600 71.308

0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000

2.087 13.487 6.260 40.461 3.384 9.632 7.260

15 20 17 28 6 18 17

88.689 573.202 200.333 1294.762 108.288 700.384 527.935

89 574 201 1295 109 701 528

5.933 28.700 11.824 46.250 18.167 38.944 31.059

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

3.053 2.224 1.528 0.059 0.520 1.560 26.208 0.000 2.038 3.840 1.920 0.270

4 2 1 1 9 9 9 2 4 2 6 3

65.604 47.789 18.415 0.705 27.300 19.500 380.016 27.300 24.563 48.000 23.136 3.384

66 48 19 1 28 20 381 28 25 48 24 4

16.500 24.000 19.000 1.000 3.111 2.222 42.333 14.000 6.250 24.000 4.000 1.333

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

4.659 4.335

7 3

73.878 93.631

74 94

10.571 31.333

20.454 112.320 179.151 0.000 0.000

0.000 0.000 0.000 19.845 0.000

0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000

2.045 11.232 17.915 1.985 0.000

4 10 12 3 1

65.453 359.424 573.283 29.075 5.741

66 360 574 30 6

16.500 36.000 47.833 10.000 6.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000

12.480 6.480 0.000 7.800 10.800 4.800 10.400

1.248 0.648 0.000 0.780 1.080 0.480 1.040

4 2 2 2 2 1 1

40.764 13.932 0.000 31.980 25.350 24.700 16.900

41 14 0 32 26 25 17

10.250 7.000 0.000 16.000 13.000 25.000 17.000

39.000 2.600 20.800 0.000 0.000 117.000

0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000

39.000 0.260 2.080 0.000 0.390 1.300

9 1 3 0 1 8

108.160 3.250 23.660 0.000 4.700 219.700

109 4 24 0 5 220

12.111 4.000 8.000 #DIV/0! 5.000 27.500

0.000 0.000 0.000

188.206 44.502 5.242

0.000 0.000 0.000

0.000 0.000 0.000

18.821 4.450 1.398

9 3 3

275.737 65.199 10.396

276 66 11

30.667 22.000 3.667

0.000

KOEFISIEN Tk. Batu

0.609

0.000

0.000

0.406

Tk. Listrik K. Tukang

1

DURASI

5.956

6

6.000

KINERJA SDM Total SDM Pembulatan SDM/Hari

Tk. Cat

Tk. Las

12.002 0.145 37.950

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

1.200 0.015 0.363

1 1 4

38.405 0.464 144.441

39 1 145

39.000 1.000 36.250

0.000 0.000 0.000 5.875 3.476 11.740 35.219 0.480 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.587 0.354 1.174 3.522 0.048 0.078 0.000 0.000 0.000

3 2 1 1 2 4 9 1 1 1 1 1

40.974 5.577 0.684 18.800 25.735 49.893 112.699 0.832 0.572 0.214 0.113 1.320

41 6 1 19 26 50 113 1 1 1 1 2

13.667 3.000 1.000 19.000 13.000 12.500 12.556 1.000 1.000 1.000 1.000 2.000

23030 127.94444 0.070

0.007

18000

22946.426 127.48014

RJA SDM Pembulatan 22 18 79 37

8 30 18 10 7 24 16 8 49 11 31 20 15 58 15 7 17 70 12 10 5 56 5 3 21 44 52 1 20 1 1 6 1 6 17 2 6

1 3 77 9 3 14 3 9 1 2 1 26 33 1 2 8 10 23

RJA SDM Pembulatan

25 30 2 48 2 22 48 32 76 16 9 52 44 43 14 2 31 3

1 15 21 10 1 35 43 6 14 21 1 11 46 44 14 13 22 37 30 39 57 34 18 8 2 14 9 1 8 10 10 9 29 4 25 2 58 2 13 10 6

6 29 12 47 19 39 32 17 24 19 1 4 3 43 14 7 24 4 2 11 32 17 36 48 10 6 11 7 0 16 13 25 17 13 4 8 #DIV/0! 5 28 31 22 4

6

RJA SDM Pembulatan 39 1 37 14 3 1 19 13 13 13 1 1 1 1 2

5030

No

Jenis Pekerjaan I 1 2 3

PEKERJAAN PERSIAPAN Pembersihan lapangan Pengukuran dan Bouwplank Penyediaan listrik & air kerja

4

Papan nama proyek

5

Administrasi proyek

II 1 2

PEKERJAAN TANAH Galian Tanah Urugan Kembali

III a 1 2 3

Sirtu Lantai Kerja Beton Balok RIB Penulangan Ulir Penulangan Polos

4

Beton Balok Sloof Penulangan Ulir Penulangan Polos Bekisting

5

Beton Plat Pondasi

6

Beton Kolom Struktur

7

Beton Balok Induk

Bekisting Penulangan Polos Bekisting Penulangan Ulir Penulangan Polos Bekisting Penulangan Ulir Penulangan Polos 8

Beton Balok Anak Bekisting Penulangan Ulir Penulangan Polos

9

Beton Plat Lantai Bekisting Penulangan Polos

10

Beton Plat Daak Canopy

11

Beton Listplank

Bekisting Penulangan Polos Bekisting Penulangan Polos 12

Tangga Beton Bekisting Penulangan Ulir Penulangan Polos

13

Water Proofing Daak Canopy

b

STRUKTUR LANTAI 2

1

Beton Kolom Struktur Bekisting Penulangan Ulir

2

Beton Balok Ring Atas Bekisting Penulangan Ulir

3

Beton Plat Daak

4

Water Proofing Daak

Bekisting Penulangan Ulir IV 1

PEKERJAAN RANGKA DAN ATAP Kuda - kuda Baja Ringan (lengkap)

2

Atap Genteng Keramik Glasur

3

Bubungan Genteng Keramik Glasur

4

Ornamen Puncak Atap

5

Corong Ta lang ø3" PVC

6

Listplank Kayu Bengkirai 2x2/20

7

Flashing Atap

I

PEKERJAAN FINISHING ARSITEKTUR LANTAI 1

a 1

Aanstamping Urug Pasir Bawah Pondasi + Urug Pasir Bawah Rolag

4

Urugan Tanah Peninggian Bangunan Pas. Rollag 1:3 Pas. Batu Bata 1:3

3

Pas. Batu Bata 1:6 Plesteran 1:3

5

Plesteran 1:6

6

Plesteran Beton

7 8 9

Beton Praktis Sloof Beton Praktis Kolom Beton Praktis Balok Latei

c

Pekerjaan Pas. Kosen

1

Kosen Aluminium 4"

2 3

Kaca Bening 5mm Kaca Raam Jendela

4

Kunci Tanam

5

Floor Hinges

6 7 8 9 10 11 12

Kunci Raam Aluminium Engsel Pintu Daun Pintu Double Teakwood Pintu PVC lengkap, engsel, kunci, kusen Pintu Raam Aluminium Sun Screen Hollow Finish Cat Raam Jendela Aluminium

13

Engsel Jendela

14

Gerendel

15 16 17 18 d 1 2

Raam Skor Pintu Shaft Besi 40/60 (lengkap) Ralling Tangga Pipa Hitam Finish Cat Ralling Depan Tralis Besi Finish Cat Plafond Expose Aci Plafond Asbes Plat List Tepi Kayu Profil Pek. Pasang Lantai Dan Dinding

1 2

Urug Pasir Bawah Lantai Lantai Rabat Beton Tritisan Lantai Keramik 20x20 cm Lavatory

4

Dinding Keramik 20x25 cm Lavatory

5

Lt. Keramik Warna 40/40 cm

6 7

Lt. Keramik Warna U. Tangga 40/40cm Plint Lantai Jeglok Finish Cat Minyak

8

Batu Tempel Dinding Canopy

9

Nosing Tangga

f 1

Down Light SL 18W Lampu Baret 40W

4 5

Ceiling Fan Stop Kontak 200W Saklar Tunggal

7

Saklar Ganda

g

Pekerjaan Sanitair

1 2

Closet Jongkok Warna Tua Saringan air (floor drain)

3

Kran air

4

Meja pantry + wash bak

5 6 h

Bak Mandi Fiber + Keramik 20/25 Kaca Cermin 40x60 Tepi Dibevel Cat Tembok Cat Plafond

3

Pelituran Daun Pintu Pek. Pas. Bata/Plesteran, Kolom Prakris

Pas. Batu Bata 1:3

5

Pas, Batu Bata 1:6 Plesteran 1:3 Plesteran 1:6 Plesteran beton

6

Beton Praktis Kolom

2 3

7

Beton Praktis Balok Latei

b

Pekerjaan Pasangan Kusen Kusen Aluminium 4' Raam Jendela Aluminium Kaca Bening 5mm

1 2 3 4 5 6 7 8 9 10 11 12 c 1 2 d 1 2 3 4 5 e 1 2 3 4 5 6 7 f 1 2 3 4 5 6

Kaca Boven 5mm Kunci Tanam Engsel Pintu Daun Pintu Double Teakwood Pintu PVC lengkap kunci engsel, kusen Sun Screen Hollow Finish Cat Engsel Jendela Gerendel Raam Skor Pekerjaan Plafond Plafond Asbes Plat List Tepi Kayu Profil Pek. Pas. Lantai dan Dinding Lt. Keramik 20x20cm Lavatory Dinding Keramik 20cmx25cm Lavatory Lantai Keramik Warna 40/40cm Plint Lantai Jeglok Finish Cat Minyak Waterproofing R Lavatory Pekerjaan Peneragan Lampu SL 18W Down Light SL 18W Lampu Baret 40W Ceiling Fan Stop Kontak 200W Saklar Tunggal Saklar Ganda Pekeraan Sanitasi Closet Jongkok Warna Tua Saringan air (floor drain) Kran air Meja pantry + wash bak Kaca Cermin 40x60 Tepi Dibevel Bak Mandi Fiber + Keramik 20/25

g

Pekerjaan Cat-Catan

1

Cat Tembok

4

Cat Plafond Pelituran Daun Pintu Cat Listplank Kayu

I

PEKERJAAN SALURAN

2 3

1 2 3

Saluran terbuka U 20 Saluran buis beton ø 20 Bak kontrol 45x45

II

PEKERJAAN SALURAN

1

Galian tanah

2 3

Urugan tanah kembali Pasir urug

4

Aanstamping

5

Beton bertulang (plat dasar,t utup)

6 7

Dinding bata 1:3 Plesteran 1:3

8

Pipa hawa ø 1½" GIP

9

Pipa PVC dia.4"

10

17 4 3 5 3 11 12 17 17 3 5 32 13 2 1 1 1 1 1 2 6 3 1 5 2 2 2 1 5 2 1 1 5 8 1 1 3 7 13 1 3 3 1 2 2 1 2 2 1 2 4 1 1 1 4 3 15 7 2

PEKERJAAN FINISHING ARSITEKTUR LANTAI 2

a 1

4

8 6 3 8 4 3 1 4 3 1 33 8 2 1 2 4 5

Pekerjaan Cat - Catan

1 2 II

3 6 9 11 3 5 8 3 3 8 8 3 3 8 4 3 3 8 10 3 5 3 1 2 1 1 3 5 3 2 1

Pekerjan Penerangan Lampu SL 18W

2 3

6

2 2 4 3 3 3 3

Pekerjaan Plafond

3 e

3

20 7

Pekerjaan Pas. Bata / Plesteran

1 2 4

8 2 180 1 180

Pekerjan Pondasi Batu Belah Pondasi Batu Belah 1:6

2 3

b

Durasi

PEKERJAAN BETON BERTULANG STRUKTUR LANTAI 1

Ijuk

11

Kerikil+batu pecah

12

Sirtu

15 20 17 28 6 18 17 4 2 1 1 9 9 9 2 4 2 6 3 7 3 4 10 12 3 1 4 2 2 2 2 1 1 9 1 3 0 1 8 9 3 3 1 1 1 4 3 2 1 1 2 4 9 1 1 1 1 1

1

2

Minggu 1 3 4

5

6

7

8

Minggu 2 9 10 11

12

13

14

Minggu 3 15 16 17

18

19

20

Minggu 4 21 22 23

24

25

26

Minggu 5 27 28 29

30

31

32

Minggu 6 33 34 35

36

37

38

Minggu 7 39 40 41

42

43

44

Minggu 8 45 46 47

48

49

50

Minggu 9 51 52 53

54

55

56

Minggu 10 57 58 59

60

61

62

Minggu 11 63 64 65

66

67

68

Minggu 12 69 70 71

72

73

74

Minggu 13 75 76 77

78

79

80

Minggu 14 81 82 83

84

85

86

Minggu 15 87 88 89

90

91

92

Minggu 16 93 94 95

96

97

98

Minggu 17 Minggu 18 Minggu 19 Minggu 20 Minggu 21 Minggu 22 Minggu 23 Minggu 24 Minggu 25 Minggu 26 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153

Minggu 26 Minggu 27 Minggu 28 Minggu 29 Minggu 30 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180

No

Jenis Pekerjaan I 1

PEKERJAAN PERSIAPAN Pembersihan lapangan

2

Pengukuran dan Bouwplank

3

Penyediaan listrik & air kerja

4

Papan nama proyek

5

Administrasi proyek

II Galian Tanah

2

Urugan Kembali

III

STRUKTUR LANTAI 1

1

Sirtu

2

Lantai Kerja

3

Beton Balok RIB Penulangan Ulir Penulangan Polos Beton Balok Sloof Penulangan Ulir Penulangan Polos Bekisting Beton Plat Pondasi Bekisting Penulangan Polos

6

Beton Kolom Struktur Bekisting Penulangan Ulir Penulangan Polos

7

Beton Balok Induk Bekisting Penulangan Ulir Penulangan Polos

8

Beton Balok Anak Bekisting Penulangan Ulir Penulangan Polos

9

Beton Plat Lantai Bekisting Penulangan Polos

10

Beton Plat Daak Canopy Bekisting Penulangan Polos

11

Beton Listplank Bekisting Penulangan Polos

12

Total SDM SDM/hari

8 2 180 1 180

170

36 180 1 180

21 18 1 1 1

20 7

1575 259

79 37

2 2 4 3 3 3 3

30 59 70 29 19 72 46

15 30 18 10 6 24 15

3 6 9 11 3 5 8 3 3 8 8 3 3 8 4 3 3 8 10 3 5 3 1 2 1 1 3 5

24 294 99 334 60 75 462 45 21 131 554 35 29 40 222 15 7 166 431 155 5 60 1 2 6 1 17 83

8 49 11 30 20 15 58 15 7 16 69 12 10 5 56 5 2 21 43 52 1 20 1 1 6 1 6 17

PEKERJAAN BETON BERTULANG

a

5

Durasi

PEKERJAAN TANAH

1

4

Volume

Tangga Beton Bekisting

Minggu 1 1 21 1 1

Penulangan Ulir Penulangan Polos 13

Water Proofing Daak Canopy

b

STRUKTUR LANTAI 2

1

Beton Kolom Struktur Bekisting Penulangan Ulir

2

Beton Balok Ring Atas Bekisting Penulangan Ulir

3

Beton Plat Daak Bekisting Penulangan Ulir

4

Water Proofing Daak

IV

PEKERJAAN RANGKA DAN ATAP

1

Kuda - kuda Baja Ringan (lengkap)

2

Atap Genteng Keramik Glasur

3

Bubungan Genteng Keramik Glasur

4

Ornamen Puncak Atap

5

Corong Talang ø3" PVC

6

Listplank Kayu Bengkirai 2x2/20

7 I

Flashing Atap PEKERJAAN FINISHING ARSITEKTUR LANTAI 1

a

Pekerjan Pondasi Batu Belah

1

Pondasi Batu Belah 1:6

2

Aanstamping

3

Urug Pasir Bawah Pondasi + Urug Pasir Bawah Rolag

4

Urugan Tanah Peninggian Bangunan

b

Pekerjaan Pas. Bata / Plesteran

1

Pas. Rollag 1:3

2

Pas. Batu Bata 1:3

3

Pas. Batu Bata 1:6

4

Plesteran 1:3

5

Plesteran 1:6

6

Plesteran Beton

7

Beton Praktis Sloof

8

Beton Praktis Kolom

9

Beton Praktis Balok Latei

c

Pekerjaan Pas. Kosen

1

Kosen Aluminium 4"

2

Kaca Bening 5mm

3

Kaca Raam Jendela

4

Kunci Tanam

5

Floor Hinges

6

Kunci Raam Aluminium

7

Engsel Pintu

8

Daun Pintu Double Teakwood

9

Pintu PVC lengkap, engsel, kunci, kusen

3 2 1

4 12 1

1 6 1

8 6 3 8 4 3 1 4 3 1

23 462 26 20 53 7 9 4 4 1

3 77 9 3 13 2 9 1 1 1

33 8 2 1 2 4 5

843 263 2 2 16 39 115

26 33 1 2 8 10 23

17 4 3 5

422 119 6 238

25 30 2 48

3 11 12 17 17 3 5 32 13

6 237 567 534 1281 48 44 1662 560

2 22 47 31 75 16 9 52 43

2 1 1 1 1 1 2 6 3

86 14 2 31 3 1 30 122 29

43 14 2 31 3 1 15 20 10

10

Pintu Raam Aluminium

11

Sun Screen Hollow Finish Cat

12

Raam Jendela Aluminium

13

Engsel Jendela

14

Gerendel

15

Raam Skor

16

Pintu Shaft Besi 40/60 (lengkap)

17

Ralling Tangga Pipa Hitam Finish Cat

18

Ralling Depan Tralis Besi Finish Cat

d

Pekerjaan Plafond

1

Plafond Expose Aci

2

Plafond Asbes Plat

3

List Tepi Kayu Profil

e

Pek. Pasang Lantai Dan Dinding

1

Urug Pasir Bawah Lantai

2

Lantai Rabat Beton Tritisan

3

Lantai Keramik 20x20 cm Lavatory

4

Dinding Keramik 20x25 cm Lavatory

5

Lt. Keramik Warna 40/40 cm

6

Lt. Keramik Warna U. Tangga 40/40cm

7

Plint Lantai Jeglok Finish Cat Minyak

8

Batu Tempel Dinding Canopy

9

Nosing Tangga

f

Pekerjan Penerangan

1

Lampu SL 18W

2

Down Light SL 18W

3

Lampu Baret 40W

4

Ceiling Fan

5

Stop Kontak 200W

6

Saklar Tunggal

7

Saklar Ganda

g

Pekerjaan Sanitair

1

Closet Jongkok Warna Tua

2

Saringan air (floor drain)

3

Kran air

4

Meja pantry + wash bak

5

Bak Mandi Fiber + Keramik 20/25

6

Kaca Cermin 40x60 Tepi Dibevel

h

Pekerjaan Cat - Catan

1

Cat Tembok

2

Cat Plafond

3

Pelituran Daun Pintu

II

PEKERJAAN FINISHING ARSITEKTUR LANTAI 2

a

Pek. Pas. Bata/Plesteran, Kolom Prakris

1

Pas. Batu Bata 1:3 Pas, Batu Bata 1:6 Plesteran 1:3 Plesteran 1:6

2 3 4

1 5 2 2 2 1 5 2 1

1 172 86 11 27 21 5 21 46

1 34 43 6 14 21 1 11 46

1 5 8

44 69 99

44 14 12

1 1 3 7 13 1 3 3 1

22 37 88 273 740 34 52 23 2

22 37 29 39 57 34 17 8 2

2 2 1 2 2 1 2

28 18 1 15 19 10 18

14 9 1 8 10 10 9

4 1 1 1 4 3

113 4 25 2 229 5

28 4 25 2 57 2

15 7 2

190 66 11

13 9 6

15 20 17 28

89 574 201 1295

6 29 12 46

5

Plesteran beton

6

Beton Praktis Kolom

7

Beton Praktis Balok Latei

b

6

Pekerjaan Pasangan Kusen Kusen Aluminium 4' Raam Jendela Aluminium Kaca Bening 5mm Kaca Boven 5mm Kunci Tanam Engsel Pintu Daun Pintu Double Teakwood Pintu PVC lengkap kunci engsel, kusen Sun Screen Hollow Finish Cat Engsel Jendela Gerendel Raam Skor Pekerjaan Plafond Plafond Asbes Plat List Tepi Kayu Profil Pek. Pas. Lantai dan Dinding Lt. Keramik 20x20cm Lavatory Dinding Keramik 20cmx25cm Lavatory Lantai Keramik Warna 40/40cm Plint Lantai Jeglok Finish Cat Minyak Waterproofing R Lavatory Pekerjaan Peneragan Lampu SL 18W Down Light SL 18W Lampu Baret 40W Ceiling Fan Stop Kontak 200W Saklar Tunggal Saklar Ganda Pekeraan Sanitasi Closet Jongkok Warna Tua Saringan air (floor drain) Kran air Meja pantry + wash bak Kaca Cermin 40x60 Tepi Dibevel Bak Mandi Fiber + Keramik 20/25

g

Pekerjaan Cat-Catan

1

4

Cat Tembok Cat Plafond Pelituran Daun Pintu Cat Listplank Kayu

I

PEKERJAAN SALURAN

1

Saluran terbuka U 20 Saluran buis beton ø 20

1 2 3 4 5 6 7 8 9 10 11 12 c 1 2 d 1 2 3 4 5 e 1 2 3 4 5 6 7 f 1 2 3 4 5

2 3

2

6 18 17

109 701 528

18 39 31

4 2 1 1 9 9 9 2 4 2 6 3

66 48 19 1 28 20 122 28 25 48 24 4

17 24 19 1 3 2 14 14 6 24 4 1

7 3

74 94

11 31

4 10 12 3 1

66 360 574 30 6

17 36 48 10 6

4 2 2 2 2 1 1

41 14 15 32 26 25 17

10 7 8 16 13 25 17

9 1 3 0 1 8

109 4 24 0 5 220

12 4 8 0 5 28

9 3 3 1

276 66 11 6

31 22 4 6

1 1

39 1

39 1

3

Bak kontrol 45x45

II

PEKERJAAN SALURAN

1

Galian tanah

2

Urugan tanah kembali

3

Pasir urug

4

Aanstamping

5

Beton bertulang (plat dasar,tutup)

6

Dinding bata 1:3

7

Plesteran 1:3

8

Pipa hawa ø 1½" GIP

9

Pipa PVC dia.4"

10

Ijuk

11

Kerikil+batu pecah

12

Sirtu

4

145

36

3 2 1 1 2 4 9 1 1 1 1 1

41 6 1 19 26 50 113 1 1 1 1 2

14 3 1 19 13 13 13 1 1 1 1 2 23 140

Minggu 1 2 3 4 21 21 21

5 22

1

1

1

1

1

1

1

1

Minggu 2 Minggu 3 Minggu 4 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 22 21 21 18 18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 55

55

60

70

70

70

70

70

70

75

75

75

23

23 23 140

24

24

42

41

57 57 259

62

72

72

72

72 72 432

72

77

77

77 462

350

300

250

200

150

100

50

0

1

2

3

2000 1800 1600 1400 1200

4

5

6

7

8

9

10

11

12

13

14

15

1

2000 1800 1600 1400 1200 1000 800 600 400 200 0

1

2

3

4

5

6

7

8

9

10

11

12

13

Minggu 4 21 22

23

24

25

Minggu 5 27 28

26

29

30

31

Minggu 6 33 34

32

35

36

37

Minggu 7 39

38

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

75

75

75

77

77

77

76

76

76

76

15

15 30

29

11 31

11 30

31 20

31 20

31 20

24 33 2

2

2

28

29

29

24

77 77 462

12

13

14

15

77

16

79

17

79

18

79

19

78 78 471

20

21

78

22

78

23

19

24

19

25

34 64 295

26

27

28

81

29

82

30

82

31

68

32

67 433

33

34

35

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

Minggu 7 40

41

42

43

Minggu 8 45 46

44

47

48

49

Minggu 9 51 52

50

53

54

55

Minggu 10 57 58

56

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

58

63

21

31

32

68

68

15 7

48 15 7

18 10 6

11 30

11 30

11 30

11 30

11 30

11 30

10 6

18

17

17

24

24

24

57

49

45

9 7

15

15

16

8

8 40

8 40

63

11

15 7

24

24

24

24

24

24

44

34

14

14

24

20

20

20

40

48

50

48

40

8

9

9

9

1

67

67

67

67

67

67 57 400

75

95

96 107 121 112 108 122 143 152 639

34

35

36

37

38

39

41

42

43

433

32

33

40

44

45

46

47

48

49

50

158 151 884

51

52

53

54

55

9

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

5

Minggu 10 59

60

61

Minggu 11 63 64 65

62

66

67

Minggu 12 69 70

68

71

72

73

Minggu 13 75 76

74

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

32

22

15 48

15 57

15 57

15 58

15 58

15 69

10 60

10 80

10

26

26

10

69

24 69

5

5

5

5

5

5

5

73

5 25

12 10

5 2

69 12 10

5 2

69 11 9 50 5 3

69

74

52 2

2

2 21 37

21 52

21 52

21 37

21 47

22 47

22 47

22 47

22 47

22 37

22 47

70 25 85

25 60

16

19

17 10

25 10

9 59 50

85 60

72 67

50 40

79 53

63 40

40 31

40 30

40 40

53 30

70 49

90 100 40 30

79 110

43

43

44 14

14

38 48

36 38

1

1

14

14

39 1

1

30

36

36

43 14

14

13 1 19 13

13 8

30

6

6 47

158 884

52

53

54

246 252 252 259 279 1578

55

56

57

58

59

60

290

61

292

62

296 294

296 292 1759

63

65

64

66

289 294 296 276 293 292 1746

67

68

69

70

71

72

73

74

75

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

Minggu 13 77

78

79

Minggu 14 81 82 83

80

84

85

Minggu 15 87 88 89

86

90

91

Minggu 16 93 94 95

92

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

15 43

15 43

20 43

20 43

29 43

29 43

29

43

9 44 1

1

1

1

1

1

6 16

6 16

62

43 52

43 41

20

20

1 20

1 6 1 17

17

17

6

1 6

1

2

1

25 56

15

25 42

25

36 51

35

36 47 85 115

50

39

30 30 45 45 85 110 110 105

39

46

14 2 31 3 1 15 15 9

16

24

25

15

50

48

27 70

40

26 46

40

26 70

65

9

77 9

77 8

26 70

30 60

30 61

65

20

20

77

3 77

3 77

16

16

16

3 77

28

45

6 14 21 1

5 13 1

1 25

1 11

10 46

13 5

10

10

10

15

10

16

23 22 37 20

53

15 30

14 9

20

50

10

9

52

51

40

9

9

14 9 1 8

7 10

17 19

11 14

27 14

68 14

31 19

17 24

57 39

47 39

31 39

35 39

1

3

10

5

10

10

3

8

10

3

10 1 1 1

1 2 295 299 299 293 298 299 298 297 290 295 294 290 283 292 287 270 269 251 228 1786 1749 1597

1746

MAN POWER

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

Man Power Mingguan

93

94

95

Man Power Mingguan

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

gu 16 96

97

Minggu 17 Minggu 18 Minggu 19 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114

98

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

5

3

3

3

3

2

2

13 2

13 3

3 13

3 14

3

3

2

2

2

2

1

1 1

1 2

25

25

25

30 57

35

35

59

59

52

52

52

52

67

67

67

86 34 18

13

5

17

17

20

20

5 2

28 4 25

28

27

30

2 65 2

60 2

60 1

44

10

19

21

18

5

5

7

7

7

7

12

12

20

9 6

5

6 57

6 31

6 21

6 36

6 35

6 11

6 40

6 25

6 20

6 25

6 30

31 39

27 39

51 39

42 39

52 39

55 34

47 39

55

234 237 228 210 175 173 173 130 138 115 106 121 119 119 1257 783

97

91

92

Mingguan

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

96

75 91 597

97

75

108

109

111

112

110

113

114

1

Mingguan

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

Minggu 20 Minggu 21 Minggu 22 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

Minggu

9 1

1 1

25

25

25

25

25

25

25

25

25

25

25

25

26

26

26

26

26

26

26

9

9

9

10

6 30

6 29

6 29

5 30

10

10

20 10 47

20 10 47

20 13 52

20 13 52

45 12 36

12 55

20 52

6 52

6 56

6 52

10 52

25 32

18 52

10 52

10 52

1

73

111

112

113

72

114

80 73 115 114 112 112 120 94 488 651

115

116

117

118

119

120

121

122

99

123

85

124

90

125

126

86

127

90 85 534

128

129

98

90

90 526

130

131

132

133

134

111

112

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

Minggu 23 Minggu 24 Minggu 25 Minggu 26 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

26

26

26

26

26

26

26

26

26

24

28 38

38

38

37

20

25

33

34

10 52

10 65

49

48

43

42

58

60

48

35

22

22

10

20

16

16

17

15

15

15

20

24

3 2 15

2 2 10

3 2 11

3 2 10

3 2 11

6 24

5 24 4 1

4 2

4 1

4

28

32

34

17 24

24 19

1 3 2 15 14 7

7

14

15

14

8

3 2 15 14 7

8

8

5

9 7 8 16

10 7 7 16

10

12

13

13

30

90 103 77 526

131

132

133

134

135

76

136

71

137

70

138

86

139

88 99 505

91

140

142

141

84

143

93 124 133 131 153 136 132 110 718

144

145

146

147

148

149

150

151

590

152

153

15

131

132

133

134

135

136

137

138

139

140

141

142

143

144

145

146

147

148

149

150

151

152

153

154

155

Minggu 26 153 154 155

Minggu 27 Minggu 28 Minggu 29 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1 2 10 9 23

6 10 23

10 23

10 23

23

4 3 10

4 3 25

4

4

5

30

26 25

35

38

37

37

37

37

38

38

38 46

46

52

46

46

48

9

9

7

9

9

15

27

32

32

31

25 17 24

5 19

19

27

35

36

28

28

14

28

7

2

2 6

71 69 590

150

151

152

153

72

154

155

90

156

89 100

157

158

97 75 585

159

160

67

67

68

71

56 59 405

161

162

163

164

165

166

63

88

89

167

168

169

89

170

96 554

171

172

173

1

1

152

153

154

155

156

157

158

159

160

161

162

163

164

165

166

167

168

169

170

171

172

173

174

175

17

Minggu 29 Minggu 30 172 173 174 175 176 177 178 179 180 170 36

1

1

1

1

1

1

1

1

1

180 1

1

1

1

1

1

1

1

1

1

180 0 1575 259 0 0 30 59 70 29 19 72 46 24 294 99 334 60 75 462 45 21 131 554 35 29 40 222 15 7 166 431 155 5 60 1 2 6 1 17 83

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

4 12 1 0 23 462 26 20 53 7 9 4 4 1 0 843 263 2 2 16 39 115 0 0 422 119 6 238 0 6 237 567 534 1281 48 44 1662 560 0 86 14 2 31 3 1 30 122 29

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 172 86 11 27 21 5 21 46 0 44 69 99 0 22 37 88 273 740 34 52 23 2 0 28 18 1 15 19 10 18 0 113 4 25 2 229 5 0 190 66 11 0 0 89 574 201 1295

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

110 701 528 0 66 48 19 1 28 20 122 28 25 48 24 4 0 74 94 0 66 360

50

50

48

48

47

47

574

10 6

10

10

30 6 0 41 14 15 32 26 25 17 0

13

109

4 8

4

8

8

24 0 5 220 0

31

31

31

31

30

276

22

22

22

66 11 6 0 39 1

-1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

145 0 41 6 1 19 26 50 113 1 1 1 1 2

96

95

89

89

79

554

170

171

172

173

174

175

176

71 40 325

177

178

34

179

12

180

23148

0 0 0 0 0 0 0 0 0 0 0 0 0 0 129

172

173

174

175

176

177

178

179

180

NO I 1 2 3 4 5 II 1 2 III a 1 2 3

4

5

6

7

8

9

10

11

12

Jenis Pekerjaan PEKERJAAN PERSIAPAN Pembersihan lapangan Pengukuran dan Bouwplank Penyediaan listrik & air kerja Papan nama proyek Administrasi proyek PEKERJAAN TANAH Galian Tanah Urugan Kembali PEKERJAAN BETON BERTULANG STRUKTUR LANTAI 1 Sirtu Lantai Kerja Beton Balok RIB Penulangan Ulir Penulangan Polos Beton Balok Sloof Penulangan Ulir Penulangan Polos Bekisting Beton Plat Pondasi Bekisting Penulangan Polos Beton Kolom Struktur Bekisting Penulangan Ulir Penulangan Polos Beton Balok Induk Bekisting Penulangan Ulir Penulangan Polos Beton Balok Anak Bekisting Penulangan Ulir Penulangan Polos Beton Plat Lantai Bekisting Penulangan Polos Beton Plat Daak Canopy Bekisting Penulangan Polos Beton Listplank Bekisting Penulangan Polos Tangga Beton Bekisting Penulangan Ulir

volume

Harga Satuan

Harga Total Pek.

Bobot

1128.68 136.8 1 1 1

13750 135588.2 13750000 1000000 2200000

15519350 18548465.76 13750000 1000000 2200000

0.26620 0.31816 0.23585 0.01715 0.03774

1409.435 93995 132479842.825 469.812 15583.3333333 7321237

2.27242 0.12558

105.56 28.71 34.08 3292.78 2080.55 35.26 5182.58 2685.04 352.72 48.29 401.42 6805.6 36.69 437.25 5001.3 2348.77 64.13 524.53 3871.75 3294.59 19.46 210.19 1591 781.45 81.518 407.75 17610.55 2.05 56.75 55.7 0.51 5.28 3.01 7.96 77.86 365.1

0.46681 0.44170 0.62970 0.73635 0.46527 0.65150 1.15896 0.60045 1.09518 0.89226 1.17065 1.52191 0.67792 2.76953 1.11842 0.52525 1.18493 3.47233 0.86583 0.73676 0.35956 1.39144 0.35579 0.17475 1.50621 3.22894 3.93819 0.03788 0.40073 0.01246 0.00942 0.02725 0.00067 0.14708 0.46312 0.08165

257812.5 896917.59 1,077,191.70 13,037.20 13,037.20 1,077,191.70 13,037.20 13,037.20 181,016.00 1,077,191.70 170,016.00 13,037.20 1,077,191.70 369,264.50 13,037.20 13,037.20 1,077,191.70 385,932.80 13,037.20 13,037.20 1,077,191.70 385,932.80 13,037.20 13,037.20 1,077,191.70 461,664.50 13,037.20 1,077,191.70 411,664.50 13,037.20 1,077,191.70 300,932.80 13,037.20 1,077,191.70 346,769.50 13,037.20

27214687.5 25750504.0089 36710693.136 42928631.416 27124546.46 37981779.342 67566331.976 35005403.488 63847963.52 52017587.193 68247822.72 88725968.32 39522163.473 161460902.625 65202948.36 30621384.244 69080303.721 202433331.584 50476779.1 42952228.748 20962150.482 81119215.232 20742185.2 10187919.94 87810513.0006 188243699.875 229592262.46 2208242.985 23361960.375 726172.04 549367.767 1588925.184 39241.972 8574445.932 26999473.27 4759881.72

13 b 1

2

3

4 IV 1 2 3 4 5 6 7 I a 1 2 3 4 b 1 2 3 4 5 6 7 8 9 c 1 2 3 4 5 6 7 8 9 10

Penulangan Polos 1332.68 13,037.20 17374415.696 Water Proofing Daak Canopy 11.98 25,910.50 310407.79 STRUKTUR LANTAI 2 Beton Kolom Struktur 11.15 1,077,191.70 12010687.455 Bekisting 437.25 369,264.50 161460902.625 Penulangan Ulir 2910.15 13,037.20 37940207.58 Beton Balok Ring Atas 9.7 103,900.50 1007834.85 Bekisting 125.35 90,863.00 11389677.05 Penulangan Ulir 778.5 13,037.20 10149460.2 Beton Plat Daak 3.97 1,077,191.70 4276451.049 Bekisting 39.72 411,664.50 16351313.94 Penulangan Ulir 421.92 13,037.20 5500655.424 Water Proofing Daak 39.72 25,910.50 1029165.06 PEKERJAAN RANGKA DAN ATAP Kuda - kuda Baja Ringan (lengkap) 1186.88 149941 177961974.08 Atap Genteng Keramik Glasur 1088.623 138935 151247836.505 Bubungan Genteng Keramik Glasur 2.41 112618 271409.38 Ornamen Puncak Atap 6 35475 212850 Corong Talang ø3" PVC 68 58384.33 3970134.44 Listplank Kayu Bengkirai 2x2/20 266.8 149380 39854584 Flashing Atap 266.8 64570.5 17227409.4 PEKERJAAN FINISHING ARSITEKTUR LAN Pekerjan Pondasi Batu Belah Pondasi Batu Belah 1:6 175.596 892171.5 156661746.714 Aanstamping 94.99 533346 50662536.54 Urug Pasir Bawah Pondasi + Urug Pasir 17.59 237050 4169709.5 Bawah Rolag Urugan Tanah Peninggian Bangunan 764.904 15583.3333333 11919754 Pekerjaan Pas. Bata / Plesteran Pas. Rollag 1:3 6.3 235028.75 1480681.125 Pas. Batu Bata 1:3 556.2 113177.35 62949242.07 Pas. Batu Bata 1:6 1334.02 109308.1 145819191.562 Plesteran 1:3 1112.4 60840.78 67679283.672 Plesteran 1:6 2668.04 58345.98 155669408.4792 Plesteran Beton 99.6 60840.78 6059741.688 Beton Praktis Sloof 21.174 200414.5 4243576.623 Beton Praktis Kolom 816 176203.51 143782064.16 Beton Praktis Balok Latei 274.6 286262.58 78607704.468 Pekerjaan Pas. Kosen Kosen Aluminium 4" 928.6 110542.3 102649579.78 Kaca Bening 5mm 74.192 127710 9475060.32 Kaca Raam Jendela 10.01 134420 1345544.2 Kunci Tanam 59 175835 10374265 Floor Hinges 4 1374835 5499340 Kunci Raam Aluminium 2 178035 356070 Engsel Pintu 156 26152.5 4079790 Daun Pintu Double Teakwood 27.84 755287.5 21027204 Pintu PVC lengkap, engsel, kunci, kusen 27 225940 6100380 Pintu Raam Aluminium 2 110542.3 221084.6

0.29802 0.00532 0.20602 2.76953 0.65079 0.01729 0.19537 0.17409 0.07335 0.28047 0.09435 0.01765 3.05258 2.59435 0.00466 0.00365 0.06810 0.68362 0.29550

2.68721 0.86901 0.07152 0.20446 0.02540 1.07977 2.50123 1.16090 2.67019 0.10394 0.07279 2.46629 1.34836 1.76075 0.16253 0.02308 0.17795 0.09433 0.00611 0.06998 0.36068 0.10464 0.00379

11 12 13 14 15 16 17 18 d 1 2 3 e 1 2 3 4 5 6 7 8 9 f 1 2 3 4 5 6 7 g 1 2 3 4 5 6 h 1 2 3 II a 1 2 3 4 5

Sun Screen Hollow Finish Cat 177.4 Raam Jendela Aluminium 920 Engsel Jendela 86 Gerendel 109 Raam Skor 109 Pintu Shaft Besi 40/60 (lengkap) 2 Ralling Tangga Pipa Hitam Finish Cat 225.63 Ralling Depan Tralis Besi Finish Cat 41 Pekerjaan Plafond Plafond Expose Aci 135.65 Plafond Asbes Plat 614.24 List Tepi Kayu Profil 909 Pek. Pasang Lantai Dan Dinding Urug Pasir Bawah Lantai 79.68 Lantai Rabat Beton Tritisan 17.83 Lantai Keramik 20x20 cm Lavatory 78.39 Dinding Keramik 20x25 cm Lavatory 188.96 Lt. Keramik Warna 40/40 cm 660.625 Lt. Keramik Warna U. Tangga 40/40cm 29.8 Plint Lantai Jeglok Finish Cat Minyak 558.7 Batu Tempel Dinding Canopy 20.39 Nosing Tangga 34.38 Pekerjan Penerangan Lampu SL 18W 106 Down Light SL 18W 67 Lampu Baret 40W 2 Ceiling Fan 27 Stop Kontak 200W 56 Saklar Tunggal 28 Saklar Ganda 53 Pekerjaan Sanitair Closet Jongkok Warna Tua 27 Saringan air (floor drain) 27 Kran air 53 Meja pantry + wash bak 4 Bak Mandi Fiber + Keramik 20/25 27 Kaca Cermin 40x60 Tepi Dibevel 27 Pekerjaan Cat - Catan Cat Tembok 2047.948 Cat Plafond 706.38 Pelituran Daun Pintu 90.72 PEKERJAAN FINISHING ARSITEKTUR LAN Pek. Pas. Bata/Plesteran, Kolom Prakris Pas. Batu Bata 1:3 208.68 Pas, Batu Bata 1:6 1348.71 Plesteran 1:3 417.36 Plesteran 1:6 2697.42 Plesteran beton 225.6

458320 109230.55 17435 33880 26422 810590 492726.3 36107.5

81305968 100492106 1499410 3692920 2879998 1621180 111173835.069 1480407.5

1.39464 1.72374 0.02572 0.06334 0.04940 0.02781 1.90696 0.02539

33013.75 28997 15994

4478315.1875 17811117.28 14538546

0.07682 0.30551 0.24938

237050 957528 205584.5 232754.5 210619.51 210619.51 12828.2 261208.75 87208

18888144 17072724.24 16115768.955 43981290.32 139140513.7938 6276461.398 7167115.34 5326046.4125 2998211.04

0.32399 0.29285 0.27643 0.75441 2.38667 0.10766 0.12294 0.09136 0.05143

54252 156552 1273052 259100 46420 43120 46970

5750712 10488984 2546104 6995700 2599520 1207360 2489410

0.09864 0.17992 0.04367 0.12000 0.04459 0.02071 0.04270

602745 40535 75524.63 341605 1161600 351560

16274115 1094445 4002805.39 1366420 31363200 9492120

0.27915 0.01877 0.06866 0.02344 0.53797 0.16282

19423.8 19423.8 54562.2

39778932.3624 13720583.844 4949882.784

0.68233 0.23535 0.08491

113177.35 109308.1 60840.78 58345.98 60840.78

23617849.398 147424927.551 25392507.9408 157383613.3716 13725679.968

0.40512 2.52878 0.43556 2.69960 0.23544

6 7 b 1 2 3 4 5 6 7 8 9 10 11 12 c 1 2 d 1 2 3 4 5 e 1 2 3 4 5 6 7 f 1 2 3 4 5 6 g 1 2 3 4 I 1 2 3

Beton Praktis Kolom Beton Praktis Balok Latei Pekerjaan Pasangan Kusen Kusen Aluminium 4' Raam Jendela Aluminium Kaca Bening 5mm Kaca Boven 5mm Kunci Tanam Engsel Pintu Daun Pintu Double Teakwood Pintu PVC lengkap kunci engsel, kusen Sun Screen Hollow Finish Cat Engsel Jendela Gerendel Raam Skor Pekerjaan Plafond Plafond Asbes Plat List Tepi Kayu Profil Pek. Pas. Lantai dan Dinding Lt. Keramik 20x20cm Lavatory Dinding Keramik 20cmx25cm Lavatory Lantai Keramik Warna 40/40cm Plint Lantai Jeglok Finish Cat Minyak Waterproofing R Lavatory Pekerjaan Peneragan Lampu SL 18W Down Light SL 18W Lampu Baret 40W Ceiling Fan Stop Kontak 200W Saklar Tunggal Saklar Ganda Pekeraan Sanitasi Closet Jongkok Warna Tua Saringan air (floor drain) Kran air Meja pantry + wash bak Kaca Cermin 40x60 Tepi Dibevel Bak Mandi Fiber + Keramik 20/25 Pekerjaan Cat-Catan Cat Tembok Cat Plafond Pelituran Daun Pintu Cat Listplank Kayu PEKERJAAN SALURAN Saluran terbuka U 20 Saluran buis beton ø 20 Bak kontrol 45x45

344 259.3

176203.51 286262.58

60614007.44 74227886.994

1.03971 1.27323

710 517.2 101.882 3.9 52 104 87.36 26 25.48 384 96 18

110542.3 109230.55 127710 134420 175835 26152.5 755287.5 225940 458320 17435 33880 26422

78485033 56494040.46 13011350.22 524238 9143420 2719860 65981916 5874440 11677993.6 6695040 3252480 475596

1.34625 0.96904 0.22318 0.00899 0.15684 0.04665 1.13179 0.10076 0.20031 0.11484 0.05579 0.00816

665.57 866.95

28997 15994

19299533.29 13865998.3

0.33104 0.23784

58.44 249.6 511.86 315 249.6

205584.5 232754.5 210619.51 12828.2 26180

12014358.18 58095523.2 107807702.3886 4040883 6534528

0.20608 0.99651 1.84922 0.06931 0.11209

104 54 0 26 54 24 52

54252 156552 1273052 259100 46420 43120 46970

5642208 8453808 0 6736600 2506680 1034880 2442440

0.09678 0.14501 0.00000 0.11555 0.04300 0.01775 0.04190

26 26 52 0 26 26

602745 40535 75524.63 341605 351560 1161600

15671370 1053910 3927280.76 0 9140560 30201600

0.26881 0.01808 0.06736 0.00000 0.15679 0.51805

2987.4 706.38 87.36 67.68

19423.8 19423.8 54562.2 40766

58026660.12 13720583.844 4766553.792 2759042.88

0.99533 0.23535 0.08176 0.04733

171.45 2.073 33

93995 15583.3333333 237050

16115442.75 32304.25 7822650

0.27643 0.00055 0.13418

II 1 2 3 4 5 6 7 8 9 10 11 12

PEKERJAAN SALURAN Galian tanah Urugan tanah kembali Pasir urug Aanstamping Beton bertulang (plat dasar,tutup) Dinding bata 1:3 Plesteran 1:3 Pipa hawa ø 1½" GIP Pipa PVC dia.4" Ijuk Kerikil+batu pecah Sirtu

36.682 93995 3447924.59 0.05914 10.14 15583.3333333 158015 0.00271 2.208 237050 523406.4 0.00898 15.064 533346 8034324.144 0.13781 12.64 1077191.7 13615703.088 0.23355 117.395 113177.35 13286455.00325 0.22790 234.79 60840.78 14284806.7362 0.24503 8 22121 176968 0.00304 13 61336 797368 0.01368 1.295 60225 77991.375 0.00134 0.365 606650 221427.25 0.00380 4.8 257812.5 1237500 0.02123 5829894092.18 100.00000

Durasi

B/hari

Total SDM

8 2 180 1 180

0.03328 0.15908 0.00131 0.01715 0.00021

170 36 180 1 180

20 7

0.11362 0.01794

1575 259

100

Minggu 1 1 2 3 4 5 6 Chart Title 0.0328839 0.0328839 0.0328839 0.0328839 0.0344498 0.0344498 100

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 90 80

0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 70 60 50 40 30

2 2 4 3 3 3 3 3 6 9 11 3 5 8 3 3 8 8 3 3 8 4 3 3 8 10 3 5 3 1 2 1 1 3 5 3

0.23341 0.22085 0.15742 0.24545 0.15509 0.21717 0.38632 0.20015 0.18253 0.09914 0.10642 0.50730 0.13558 0.34619 0.37281 0.17508 0.14812 0.43404 0.28861 0.24559 0.04495 0.34786 0.11860 0.05825 0.18828 0.32289 1.31273 0.00758 0.13358 0.01246 0.00471 0.02725 0.00067 0.04903 0.09262 0.02722

30 59 70 29 19 72 46 24 294 99 90 334 60 75 462 45 21 131 554 35 29 40 222 15 7 166 431 155 5 60 1 280 6 1 17 83 4

20 10 0

0

20

40

60

80

100

120

140

160

180

20

2 1

0.14901 0.00532

12 1

8 6 3 8 4 3 1 4 3 1

0.02575 0.46159 0.21693 0.00216 0.04884 0.05803 0.07335 0.07012 0.03145 0.01765

23 462 26 20 53 7 9 4 4 1

33 8 2 1 2 4 5

0.09250 0.32429 0.00233 0.00365 0.03405 0.17091 0.05910

843 70 263 2 2 16 39 115

17 4 3 5

0.15807 0.21725 0.02384 0.04089

422 119 6 238

3 11 12 17 17 3 5 32 13

0.00847 0.09816 0.20844 0.06829 0.15707 0.03465 0.01456 0.07707 0.10372

6 237 567 534 1281 48 44 60 1662 560

2 1 1 1 1 1 2 6 3 1

0.88037 0.16253 0.02308 0.17795 0.09433 0.00611 0.03499 0.06011 0.03488 0.00379

86 14 2 31 3 1 30 122 29 1

5 2 2 2 1 5 2 1

0.27893 0.86187 0.01286 0.03167 0.04940 0.00556 0.95348 0.02539

172 86 11 27 21 5 21 50 46

1 5 8

0.07682 0.06110 0.03117

44 69 99

1 1 3 7 13 1 3 3 1

0.32399 0.29285 0.09214 0.10777 0.18359 0.10766 0.04098 0.03045 0.05143

22 37 88 273 740 34 52 23 2

2 2 1 2 2 1 2

0.04932 0.08996 0.04367 0.06000 0.02229 0.02071 0.02135

28 18 1 15 19 40 10 18

4 1 1 1 4 3

0.06979 0.01877 0.06866 0.02344 0.13449 0.05427

113 4 25 2 229 5

15 7 2

0.04549 0.03362 0.04245

190 66 11

15 20 17 28 6

0.02701 0.12644 0.02562 0.09641 0.03924

89 574 201 1295 109 30

30

18 17

0.05776 0.07490

701 528

4 2 1 1 9 9 9 2 4 2 6 3

0.33656 0.48452 0.22318 0.00899 0.01743 0.00518 0.12575 0.05038 0.05008 0.05742 0.00930 0.00272

66 48 19 1 28 20 122 28 25 48 24 4

7 3

0.04729 0.07928

74 94

4 10 12 3 1

0.05152 0.09965 0.15410 0.02310 0.11209

66 20 360 574 30 6

4 2 2 2 2 1 1

0.02420 0.07250 0.00000 0.05778 0.02150 0.01775 0.04190

41 14 15 32 26 25 17

9 1 3 0 1 8

0.02987 0.01808 0.02245 0.15679 0.06476

109 4 24 0 5 220

9 3 3 1

0.11059 0.07845 0.02725 0.04733

10 276 66 11 6

1 1 4

0.27643 0.00055 0.03355

39 1 145

3 2 1 1 2 4 9 1 1 1 1 1

0.01971 0.00136 0.00898 0.13781 0.11677 0.05698 0.02723 0.00304 0.01368 0.00134 0.00380 0.02123

41 6 1 19 26 50 113 1 1 1 1 20

0

0.0344038 0.0344038 0.0344038 0.0344038 0.0359697 0.0359697 0.0344038 0.0688077 0.1032115 0.1376153 0.1735851 0.2095548 1 0.2095548242 0.2095548242

KU 120

100

80

60

40

20

0

0

5

10

140

Minggu 2 Minggu 3 7 8 9 10 11 12 13 14 15 0.0328839 0.0328839 0.1590806 0.1590806 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.017153 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0793544 0.0793544 0.0865685 0.1009966 0.1009966 0.1009966 0.1009966

160

180

200

0.2106374 0.1934845 0.0808744 0.0808744 0.0880884 0.1025165 0.1025165 0.1025165 0.1025165 0.4201923 0.6136768 0.6945511 0.7754255 0.863514 0.9660305 1.068547 1.1710635 1.27358 2 3 0.756475653 0.6223131177 0.9660304771 1.5883435948

KURVA S MINGGUAN

10

15

20

25

30

35

Minggu 3 16

17

18

19

20

Minggu 4 21 22

23

24

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.1009966 0.1009966 0.1082106 0.1082106 0.1082106 0.1082106 0.1082106 0.1082106 0.1110962

20

0.1025165 0.1025165 0.1097306 0.1097306 0.1097306 0.1097306 0.1097306 0.1097306 0.1126162 1.3760965 1.478613 1.5883436 1.6980741 1.8078047 1.9175353 2.0272658 2.1369964 2.2496125 3 4 0.6223131177 0.6612689372 1.5883435948 2.249612532

25

26

Minggu 5 27 28

Minggu 6 29

30

31

32

33

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.1110962 0.1110962 0.1096534 0.1096534 0.1096534 0.1096534

0.2334064 0.2334064 0.224592

0.023841 0.023841 0.023841

0.1126162 0.1126162 0.1111734 0.1111734 0.1111734 0.1111734 0.2587673 0.2587673 0.2499529 2.3622287 2.4748449 2.5860182 2.6971916 2.808365 2.9195383 3.1783056 3.4370729 3.6870258 5 6 0.669925786 2.8783057151 2.919538318 5.7978440331

Minggu 6 34

35

36

37

38

Minggu 7 39 40

41

42

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.00020965 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096

0.2171056

0.0991396 0.0991396 0.0991396 0.0991396 0.0991396 0.1086534 0.10865341 0.1086534 0.1086534 0.1051485 0.1051485 0.1051485 0.1051485 0.5073046 0.50730463 0.5073046

0.1528274 0.1528274 0.1528274 0.1528274 0.1528274 0.2409868 0.2044736 0.21177627 0.2117763

40

0.4596124 0.8219516 0.82925426 0.8292543 0.3621403 0.3586353 0.3586353 0.3586353 0.3586353 4.1466381 4.9685898 5.79784403 6.6270983 6.9892386 7.3478739 7.7065092 8.0651446 8.4237799 6 7 2.8783057151 2.6259358461 5.7978440331 8.4237798792

43

44

Minggu 8 45 46

47

48

49

50

Minggu 9 51

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096

0.1619222 0.1619222 0.253915 0.253915 0.2285235 0.1469263 0.1469263 0.171414 0.2171668 0.3779228 0.3779228 0.4031177 0.2001489 0.2001489 0.2001489 0.1490044 0.1490044 0.2346819 0.2123312 0.0991396 0.0991396 0.0991396 0.0991396 0.1051485 0.1051485 0.1051485

0.1528274 0.1528274 0.1528274 0.2801835 0.2165054 0.0891493 0.0891493 0.1528274 0.1273561

0.3586353 0.3586353 0.3586353 0.380843 1.1969383 1.2185866 1.2428777 0.5509514 0.7202963 8.7824152 9.1410505 9.4996859 9.8805289 11.077467 12.296054 13.538931 14.089883 14.810179 8 9 3.8722739122 4.6663472229 12.2960537914 16.9624010142

Minggu 9 52

53

54

55

56

Minggu 10 57 58

59

60

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.00020965 0.0002096 0.0002096 0.0002096

0.0281224 0.0305467 0.01018224 0.0150309 0.0155158 0.0155158

0.1529265 0.1529265

0.2171668 0.2171668

0.1825304 0.1676299

0.1355845 0.1355845 0.2877438 0.40763705 0.407637 0.2877438 0.3416958 0.3728081 0.3728081 0.3728081 0.1750826 0.1750826 0.1750826

0.1273561 0.1273561 0.2547123

0.0412355 0.0429536 0.04123547 0.0343629 0.0446718 0.008466

0.0132345 0.0148889 0.01488885 0.0148889 0.0148889 0.0875518 0.1203889

0.2764277

60

0.6814997 0.6665993 0.8041228 0.632003 0.9255436 0.47546355 0.4734397 0.4999246 0.9871504 15.491679 16.158278 16.962401 17.594404 18.519948 18.9954111 19.468851 19.968775 20.955926 9 10 4.6663472229 3.9935248043 16.9624010142 20.9559258186

61

62

Minggu 11 63 64

65

66

67

68

Minggu 12 69

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096

0.0106671

0.1355845 0.1355845 0.1355845 0.3416958 0.3476904 0.3476904

0.2968549 0.2540546

0.1185967 0.0499295

0.2170869 0.4324747 0.4324747 0.4324747 0.4324747 0.4324747 0.2968549 0.272117 0.2540546 0.2286491 0.0449454 0.3133864 0.4638118 0.4575441 0.1566932 0.1185967 0.1185967 0.0499295 0.0748942

0.008466 0.008466 0.0956755 0.0956755 0.0956755 0.0956755 0.0956755 0.1002315 0.1002315 0.1632197 0.2293899 0.2293899 0.1632197 0.2073332 0.2073332 0.2073332

0.1261339 0.1068429 0.0741964 0.1172304 0.0934875 0.0593571 0.0593571 0.0593571 0.0786482 0.1444667 0.1613211 0.0963111 0.1276122 0.0963111 0.0746411 0.0722333 0.0963111 0.0722333

0.0005541 0.0277617 0.0333141 0.0333141 0.0397918

0.0201949 0.0201949 0.0187524 0.008978 0.1378125

60

0.7968498 0.7947389 0.9475117 1.3306554 1.6884891 1.8547264 1.351158 1.3637496 1.4489788 21.752776 22.547515 23.495026 24.825682 26.514171 28.368897 29.720055 31.083805 32.532784 11 12 7.4129713403 7.7507686828 28.3688971588 36.1196658416

Minggu 12 70

71

72

73

74

Minggu 13 75 76

77

78

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096

0.1356793 0.0904529 0.0904529 0.0904529 0.2351774 0.2351774 0.0904529 0.4324747 0.3760649 0.5014199

0.0449454 0.0449454 0.0449454 0.0449454 0.0449454 0.0449454 0.0449454

0.3221447 1.5752757 1.321199 0.1335757 0.012456 0

0.1002315 0.1002315 0.1002315 0.1002315 0.2073332 0.2073332 0.1632197 0.2073332 0.3087941 0.0543493 0.0543493 0.0543493 0.0543493 0.1771791 0.1250676 0.1167297 0.0875473

0.103875 0.1335536 0.1483929 0.1172304 0.1632322 0.0237429 0.0281946 0.0222589 0.0370982 0.1179811 0.0963111 0.0722333 0 0.8803726 0.8803726 0.1625254 0.0230801

0.0061077 0.0502585 0.0739096 0.0443458 0.0473022 0.0360826 0.0360826 0.0324744

0.3081179 0.2919012 0.2270342 0.3648764 0.9620864 0.7616517 0.0140287 0.0116906 0.0328453 0.0304992 0.0494005 0.0055616 0.0055616 0.0055616 0.0055616

0.0768164 0.0619883 0.0619883 0.0619883 0.0619883 0.0575605 0.0125949

0.1167749 0.1167749 0.0364643 0.1367413 0.0273483 0.0273483 0.1019138 0.0216838 0.0108419

1.260815 1.1671874 1.1588799 1.7176318 1.7233781 1.9883576 1.6775385 2.4592377 2.4408009 33.793599 34.960786 36.119666 37.837298 39.560676 41.549033 43.226572 45.68581 48.12661 12 13 7.7507686828 12.0069446057 36.1196658416 48.1266104473

80

79

80

81

Minggu 14 82

0.0013103 0.0013103 0.0013103

83

84

85

86

Minggu 15 87

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103

0.0002096 0.0002096 0.0002096 0.00020965 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096

0.081662 0.13610341 0.1361034 0.1814712 0.1814712 0.2631333 0.2631333 0.3221447 0.3221447 0.3296364 0.32214468 0.3221447 0.3221447 0.3221447 0.3221447 0.3221447 1.0417146 0.0075756 0.0075756 0.00757559 0.0075756 0.0075756 0.1335757 0.1335757

C

0.0053244

0.078263 0.078263 0.1021767 0.06521914 0.0652191 0.0978287 0.0978287 0.0586972 0.0565233 0.1063074 0.1771791 0.2397129 0.17717907 0.2292906 0.2292906 0.2188683 0.1459122 0.0958851

0.0519375 0.0741964 0.0578732 0.05787322 0.0682607 0.0741964 0.0712286 0.0593571 0.0593571

0.1779495 0.09433 0.0349903 0.03499026 0.0709532 0.0739096 0.0037923

0.2027091

0.0055616 0.9988846 0.9080769 0.02539339

0.0251898 0.0251898 0.0251898 0.03778473 0.0251898 0.0403037 0.0579366 0.3239878 0.2928479 0.0628258

0.0493209 0.0493209 0.0899586 0.0899586

0.0252141 0.016315 0.0458169 0.0337599

0.0013552

0.0216838 0.0216838 0.0065051 0.01734703 0.0216838 0.0216838 0.0030355 0.0136772 0.0013378 0.0037981 0.0212268 80 2.0653527 1.9141222 1.8892489 0.88313047 1.0549371 0.9760146 0.9743729 1.4100877 1.3449467 50.191963 52.106085 53.995334 54.8784646 55.933402 56.909416 57.883789 59.293877 60.638824 14 15 8.7828059437 6.80716845 56.909416391 63.7165848409

Minggu 15 88

89

90

91

92

Minggu 16 93 94

95

96

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103

Chart Title

0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.00020965 0.0002096 0.0002096

0.2631333

0.00471164 0.0047116 0.0272548 0.0006731 0.05190961 0.0519096 0.043258 0.0948561 0.0948561 0.0948561 0.08927637 0.0892764 0.0204115 0.0204115 0.0408231

0.1490114 0.1490114

0.026872 0.02687204 0.026872 0.026872 0.461589 0.461589 0.461589 0.461589 0.46158901 0.461589 0.2252725 0.2252725 0.2002422

0.0565233 0.0565233 0.0652191 0.0652191 0.1459122 0.1459122 0.1250676 0.127152 0.0346475 0.0346475 0.03464752 0.0964554 0.0964554 0.0296786 0.0296786

0.1664882 0.0471193 0.0829022 0.0552681 0.1381703 0.1436971 0.14093369 0.1105362 0.0829022 0 0

0.0436732 0.0639984 0.0559986 0.0234682 0.0211213 0.0207098 0.02135039 0.0213504 0.0691698 0.018773 0.06866 0.1526995 0.0651272

0.0400459 0.1008563 0.0459786 0.0252141 0.0845413 0.0697095 0.04597863 0.0519114 0.0459786 0.0337599 0.0337599 0.0458169 0.057874 0.0940453 0.0940453 0.0940453 0.0940453 0.0940453

0.0013552

0.8488665 0.9204286 1.3084661 1.162493 0.9719871 0.9749012 0.97283415 0.9137219 0.6690055 61.48769 62.408119 63.716585 64.879078 65.851065 66.825966 67.7988002 68.712522 69.381528 15 16 6.80716845 5.6649428328 63.7165848409 69.3815276738

97

98

Minggu 17 99 100

101

102

103

104

Minggu 18 105

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.00131 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.00021 0.0002096

0.026872 0.026872 0.026872 0.0179147

0.002593 0.0025931 0.0479202 0.0479202 0.04792 0.0516063 0.049741 0.049741 0.0746115

0.1838383 0.1128832 0.1128832 0.1902888 0.1902888 0.1677122 0.1677122 0.167712 0.1677122

0.0516369 0.0198603 0.0198603

0.0691698 0.0666994 0.0741105

0.0234382 0.1409534 0.1409534 0.1033658 0.0651272 0.0325636 0.0359119 0.0682327 0.0754151 0.0646415 0.017956 0.017956 0.0251384 0.0463119 0.0385933

0 0

0 0.027311 0.0273112 0 0.251115 0.1365715

0.0400459 0.0756423 0.0622936 0.0771254 0.081575 0.0697095 0.081575 0.0940453 0.0940453 0.0940453 0.0940453 0.0819882 0.0940453

100

0.7195207 0.6096327 0.5308626 0.472565 0.480528 0.4952896 0.3912947 0.516128 0.4124526 70.101048 70.710681 71.241544 71.714109 72.194637 72.689926 73.081221 73.59735 74.009801 17 18 3.3083986014 2.5422795791 72.6899262752 75.2322058543

Minggu 18 106

107

108

109

110

Minggu 19 111 112

113

114

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096

0.0025931 0.0025931 0.0017287 0.0017287 0.0017287 0.0017287

0.0701184 0.0701184 0.0235881 0.0235881 0.0471763

0.0905272 0.0905272 0.0905272

0.2160907 0.2160907 0.2160907 0.2773701 0 0 0

0.10766 0 0 0.0425552 0.040191 0.040191

0

0.0514282

0.0251384 0.0251384 0.0251384 0.0430943 0.0430943 0.0718239 0.0718239 0.0718239 0.032093

0.0273112 0.0273112 0.0273112 0.0273112 0.0273112 0.0273112 0.0273112 0.0273112 0.0273112 0.0925162 0.1585992 0.1541936 0.0484609 0.1762213 0.1101383 0.0881106 0.1101383 0.132166

0.3651695 0.4312524 0.4259825 0.3994852 0.3575355 0.3065055 0.343072 0.4352181 0.400912 74.374971 74.806223 75.232206 75.631691 75.989226 76.295732 76.638804 77.074022 77.474934 18 19 2.5422795791 2.2427282958 75.2322058543 77.47493415

115

116

Minggu 20 117 118

119

120

121

122

Minggu 21 123

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096

0.0733538 0.0701184 0.0701184 0.0176532 0.0905272 0.0905272 0.0905272 0.0905272 0.0905272 0.0905272 0.0905272 0.0905272 0.0905272

0.032093 0.032093 0.032093 0.0356589 0.0356589 0.0356589

0.0273112 0.0273112 0.0273112 0.0227593 0 0.132166 0.1277604 0.1277604 0.132166 0.0881106 0.0881106 0.0881106 0.0881106 0.1982489 0 0 0.0216695 0.0216695 0.0281703 0.0281703 0.0260034 0 0 0.0979776 0.0979776 0.1084008 0.1084008 0.0750467

120

0.3537357 0.3493302 0.3525656 0.3002846 0.3354638 0.3354638 0.3167289 0.3167289 0.3913462 77.82867 78.178 78.530566 78.83085 79.166314 79.501778 79.818507 80.135236 80.526582 20 21 2.0268436549 1.7147456563 79.5017778049 81.2165234612

Minggu 21 124

125

126

127

128

Minggu 22 129 130

131

132

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096

0.0905272 0.0905272 0.0905272 0.0941483 0.0941483 0.0941483 0.0941483 0.0941483 0.0941483

0 0.0260034 0.043339 0.0130017 0.0130017 0.0130017 0.0216695 0.0541737 0.0390051 0.0216695 0.1146547 0.1084008 0.1084008 0.1167393 0.1084008 0.1084008 0.0667082 0.1084008 0.1084008

0.2327052 0.2437869 0.2134496 0.2254092 0.2170707 0.2257385 0.2165501 0.2430741 0.2257385 80.759287 81.003074 81.216523 81.441933 81.659003 81.884742 82.101292 82.344366 82.570105 21 22 1.7147456563 1.3535811133 81.2165234612 82.5701045746

133

134

Minggu 23 135 136

137

138

139

140

Minggu 24 141

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.00020965 0.0002096 0.0002096 0.0002096 0.0002096

0.0941483 0.0941483 0.0941483 0.0941483 0.09414827 0.0941483 0.0941483 0.0941483 0.0941483

0.0216695 0.0216695 0.0216695 0 0 0 0.1084008 0.1084008 0.135501 0.1021469 0.10006226 0.0896391 0.0875545 0.1209086 0.1250778

140

0.2257385 0.2257385 0.2528387 0.1978151 0.19573047 0.1853073 0.1832227 0.2165768 0.220746 82.795843 83.021582 83.27442 83.472235 83.6679658 83.853273 84.036496 84.253073 84.473819 23 24 1.2831685629 2.2869746171 83.8532731375 86.1402477545

Minggu 24 142

143

144

145

146

Minggu 25 147 148

149

150

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096

0.0941483 0.0869061 0.1013904 0.374849 0.374849 0.374849 0.3649846 0.1972889 0.2466112

0.1000623 0.0729621 0.0458619 0.0458619 0.0208463 0 0 0 0 0.0431993 0.0323995 0.0323995 0.0323995

0.326364 0.326364 0.3467617 0.3467617

0.031315

0.06263 0.0671036

0 0.4845203 0.4845203 0 0 0 0.2231833 0 0.0089922 0 0 0 0.0168039 0.0168039 0.0168039 0.0112026 0.0168039 0.0046654 0.0046654 0.0046654 0.0046654 0.0046654 0.139154 0.139154 0.139154 0.0927693 0.1020463 0.050382 0.050382 0 0 0.0560874 0.0560874 0.0480749 0.0400625 0 0.0574199 0.0574199 0.0092983 0.0092983 0.0020395 0.0040789

0.06263 0.0357886 0.0357886 0.0357886 0 0 0 0.0708469 0.0809678

0.0212445 0.023605 0.072504 0.072504 0 0 0.0577763 0.0577763

0.5534095 0.5503821 0.5626376 0.8316226 1.1936092 1.2069699 0.923994 0.6710375 0.6522766 85.027228 85.57761 86.140248 86.97187 88.165479 89.372449 90.296443 90.967481 91.619757 24 25 2.2869746171 5.4795097306 86.1402477545 91.6197574852

151

152

Minggu 26 153 154

155

156

157

158

Minggu 27 159

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.00020965 0.0002096 0.0002096 0.0002096 0.0002096

0.3255268 0.3353912 0.0023277 0.0023277 0.00365101 0.04256225 0.0255373 0.1577595 0.1752883 0.05910025 0.0591002 0.0591002

0.0431993 0.0518392

0

0.0168039 0.0168039 0.0224053 0.0224053 0.0046654 0.0046654 0.0069981 0.0069981 0.0927693 0.1020463 0.0927693 0.2319233

0.0092983 0.0092983 0.0092983 0.0092983 0.0020395 0

0.0860283

0 0.0156123 0.0156123 0.0936736 0.08118379 0.0692021 0.096883 0.1051872 0.1024192

0.023605 0.028326

0.0214985 0.0214985 0.0177513 0.0418951

0.1567878 0.0447404 0.0447404 0.0635785 0.0824166

160

0.6269543 0.587001 0.2105772 0.3681462 0.34577674 0.5321762 0.2022436 0.1702857 0.1863557 92.246712 92.833713 93.04429 93.412436 93.7582129 94.290389 94.492633 94.662918 94.849274 26 27 2.6706316386 1.0873402455 94.2903891237 95.3777293692

Minggu 27 160

161

162

163

164

Minggu 28 165 166

167

168

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096

0.1024192 0.1024192 0.1024192 0.1051872 0.1051872 0.1051872 0.1481955 0.1481955 0.1675254

0.0591876 0.0345261 0.0221954 0.0221954 0.0172631

0.0847714 0.0659333 0.0659333 0.0659333 0.0973692 0.0520294 0.0148656 0.0148656 0.0473258

160

0.1887105 0.1698724 0.1698724 0.1726405 0.2179243 0.1560989 0.1867764 0.2192366 0.2836776 95.037985 95.207857 95.377729 95.55037 95.768294 95.924393 96.111169 96.330406 96.614084 27 28 1.0873402455 1.2363541779 95.3777293692 96.6140835471

169

170

Minggu 29 171 172

173

174

175

176

Minggu 30 177

0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096 0.0002096

0.1481955 0.1481955 0.1546388 0.1610821 0.1610821 0.1546388 0.1546388 0.1514172 0.1514172

0.0221954 0.0221954 0.0369923

0.03206 0.0180777 0.0224548 0.0224548 0.0224548

0.1154005 0.1154005 0.1117943 0.1117943 0.1117943 0.1117943 0.1117943 0.108188 0.0784496

0.2873114 0.2873114 0.3049453 0.3064563 0.3149288 0.2904079 0.2904079 0.2611251 0.2313867 96.901395 97.188706 97.493652 97.800108 98.115037 98.405444 98.695852 98.956977 99.188364 29 30 1.7913609327 1.12577836 98.4054444798 99.5312228398

Minggu 30 178

179

180

0.0013103 0.0013103 0.0013103 0.0002096 0.0002096 0.0002096

0.0231044 0.0231044 0.0231044 0.1120866

0.0784496 0.0784496

180

0.2151605 0.1030739 0.0246243 99.403525 99.506599 99.531223 30 1.12577836 99.5312228398

Jenis Pekerjaan

Pekerjaan Persiapan

Pekerjaan Tanah

Pekerjaan Pondasi Batu Belah

Pekerjaan Struktur Lantai 1

Pekerjaan Beton Bertulang Lantai 2

Pekerjaan Rangka Atap dan Atap

Pekerjaan Batu Bata / Plesteran Lantai 1

Pekerjaan Pasangan Kusen Lantai 1

No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 42 43 44 45 46 47 48 49 50 51 52 53 54 55

Uraian Pekerjaan Pembersihan Lapangan Pengukuran dan Pemasangan Bouwplank Penyediaan Listrik dan Air Kerja Pemasangan Papan Nama Proyek Administrasi Proyek Galian Tanah Urugan Kembali Pemasangan pondasi batu belah 1:6 Pemasangan Aanstamping Urugan pasir bawah pondasi Urugan pasir bawah rolag Urugan tanah peninggian bangunan t = 60 cm Sirtu Pekerjaan lantai kerja 1:3:5 bwh poor/sloof t=5 cm Pekerjaan beton balok RIB Pekerjaan beton balok sloof Pekerjaan beton plat pondasi Pekerjaan beton kolom struktur Pekerjaan beton balok induk Pekerjaan beton balok anak Pekerjaan beton plat lantai Pekerjaan beton plat daak canopy Pekerjaan beton listplank Pekerjaan tangga beton Pekerjaan water proofing daak canopy Pekerjaan beton kolom struktur Pekerjaan beton balok ring atas Pekerjaan beton plat daak Pekerjaan water proofing daak Pemasangan kuda-kuda baja ringan Pemasangan atap genteng keramik glasur Pemasangan bubungan genteng keramik glasur Pemasangan ornament puncak atap Pemasangan corong talang Ø3” PVC Pemasangan Listplank ky bengkirai 2x2/20 Pemasangan flashing atap Pekerjaan pasangan rollag 1:3 Pekerjaan pasangan batu bata 1:3 Pekerjaan pasangan batu bata 1:6 Pekerjaan plesteran 1:3 Pekerjaan plesteran 1:6 Pekerjaan plesteran beton Pekerjaan beton praktis sloof Pekerjaan beton praktis kolom Pekerjaan beton praktis balok latei Pekerjaan kusen aluminium 4” Pemasangan kaca bening 5 mm Pemasangan kaca raam jendela 5mm Pemasangan kunci tanam Pemasangan floor hinges

Ket A1 A2 A3 A4 A5 B1 B2 F1 F2 F3 F4 F5 C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 D1 D2 D3 D4 E1 E2 E3 E4 E5 E6 E7 G1 G2 G3 G4 G5 G6 G7 G8 G9 H1 H2 H3 H4 H5

Pekerjaan Pasangan Kusen Lantai 1

Pekerjaan Plafond Lantai 1

Pekerjaan Lantai dan Dinding Lantai 1

Pekerjaan Penerangan Lantai 1

Pekerjaan Sanitair Lantai 1

Pekerjaan Cat-catan Lantai 1

Pekerjaan Batu Bata / Plesteran Lantai 2

Pekerjaan Pasangan Kusen Lantai 2

56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107

Pemasangan kunci raam alluminium Pemasangan engsel pintu Pemasangan daun pintu double teakwood Pemasangan pintu PVC lengkap kunci, engsel, kusen Pemasangan pintu raam alluminium Pemasangan sun screen hollow finish cat Pemasangan raam jendela alluminium Pemasangan engsel jendela Pemasangan Grendel Pemasangan raam skor Pemasangan pintu shaft besi 40/60 Pekerjaan railing tangga pipa hitam finish cat lantai 1railing ke lantai 2 besi finish cat lantai Pekerjaan tralis canopy Pekerjaan plafond exspose aci Pekerjaan plafond asbes plat Pekerjaan list tepi kayu profil Urugan pasir bawah lantai Pekerjaan lantai rabat beton tritisan Pekerjaan lantai keramik 20x20 cm lavatory Pekerjaan dinding keramik 20x25 cm lavatory Pekerjaan lantai keramik warna 40/40 cm Pekerjaan lantai keramik warna untuk tangga 40/40 cmlantai jeglok finish cat Pekerjaan plint minyak Pekerjaan batu tempel dinding canopy Pekerjaan nosing tangga Pemasangan lampu dan down light SL 18 W Pemasangan lampu baret 40 W Pemasangan ceiling fan Pemasangan stop kontak 200 W Pemasangan saklar tunggal Pemasangan saklar ganda Pemasangan closet jongkok Pemasangan saringan air Pemasangan kran air Pemasangan meja pantry + wash bak Pemasangan bak mandi fiber + keramik 20/25 Pemasangan kaca cermin 40x60 tepi dibevel Pekerjaan cat tembok Pekerjaan cat plafond Pekerjaan pelituran daun pintu Pekerjaan pasangan batu bata 1:3 Pekerjaan pasangan batu bata 1:6 Pekerjaan plesteran 1:3 Pekerjaan plesteran 1:6 Pekerjaan plesteran beton Pekerjaan beton praktis kolom Pekerjaan beton praktis balok latei Pekerjaan kusen aluminium 4” Pemasangan kaca raam jendela 5 mm Pemasangan kaca bening 5 mm Pemasangan kaca boven 5 mm Pemasangan kunci tanam

H6 H7 H8 H9 H10 H11 H12 H13 H14 H15 H16 H17 H18 I1 I2 I3 J1 J2 J3 J4 J5 J6 J7 J8 J9 K1 K2 K3 K4 K5 K6 L1 L2 L3 L4 L5 L6 M1 M2 M3 N1 N2 N3 N4 N5 N6 N7 O1 O2 O3 O4 O5

Pekerjaan Pasangan Kusen Lantai 2

Pekerjaan Plafond Lantai 2 Pekerjaan Lantai dan Dinding Lantai 2

Pekerjaan Penerangan Lantai 2

Pekerjaan Sanitair Lantai 2

Pekerjaan Cat-catan Lantai 2

Pekerjaan Saluran

Pekerjaan Septictank dan Peresapan

108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151

Pemasangan engsel pintu Pemasangan daun pintu double teakwood Pemasangan pintu PVC lengkap kunci, engsel, kusen Pemasangan sun screen hollow finish cat Pemasangan engsel jendela Pemasangan grendel Pemasangan raam skor Pekerjaan plafond asbes plat Pekerjaan list tepi kayu profil Pekerjaan lantai keramik 20x20 cm lavatory Pekerjaan dinding keramik 20x25 cm lavatory Pekerjaan lantai keramik warna 40/40 cm Pekerjaan plint lantai jeglok finish cat minyak Pekerjaan water proofing R lavatory Pemasangan lampu dan down light SL 18 W Pemasangan lampu baret Pemasangan ceiling fan Pemasangan stop kontak 200 W Pemasangan saklar tunggal Pemasangan saklar ganda Pemasangan closet jongkok Pemasangan saringan air Pemasangan kran air Pemasangan kaca cermin 40x60 tepi dibevel Pemasangan bak mandi fiber + keramik 20/25 Pekerjaan cat tembok Pekerjaan cat plafond Pekerjaan pelituran daun pintu Pekerjaan cat listplank kayu Pemasangan saluran terbuka U 20 Pemasangan saluran buis beton Ø20 Pemasangan bak control 45x45 Galian tanah (Septictank+Peresapan) Urugan tanah kembali (Septictank+Peresapan) Urugan pasir (Septictank+Peresapan) Pemasangan Aanstamping (Septictank+Peresapan) Pemasangan beton bertulang (plat dasar,tutup) (Septictank+Peresapan) Pemasangan dinding bata 1:3 (Septictank+Peresapan) Pemasangan plesteran 1:3 (Septictank+Peresapan) Pemasangan pipa hawa Ø11/2 “ GIP (Septictank+Peresapan) Pemasangan pipa PVC dia.4” (Septictank+Peresapan) Pemasangan ijuk (Septictank+Peresapan) Pemasangan kerikil dan batu pecah (Septictank+Peresapan) Pemasangan sirtu (Septictank+Peresapan)

O6 O7 O8 O9 O10 O11 O12 P1 P2 Q1 Q2 Q3 Q4 Q5 R1 R2 R3 R4 R5 R6 S1 S2 S3 S4 S5 T1 T2 T3 T4 U1 U2 U3 V1 V2 V3 V4 V5 V6 V7 V8 V9 V10 V11 V12

Durasi (hari) P. Sebelum P.Sesudah 8 B1 2 A1 B1 180 1 A1 180 20 A1;A2 C1 7 F1 17 F2 B2;G7 4 F4 F1 2 B1 2 B1 F2 5 F1 G1 2 B1 C2 2 C1 C5 7 C5 C6 7 C5 C6 12 C2 C3;C4 10 C3; C4 C7;C8 13 C6 C9 13 C6 C9 12 C7;C8 D1 8 C7;C8 C13 4 G3 8 C9 1 C10 12 C9 D2 11 D1 D3;E1 6 D2 D4 1 D3 33 D2 E2 8 E1 E3 E4;E5; 2 E2 E6;E7 1 E2 2 E2 4 E2 5 E2 3 F5 G2 11 G1 G4;G5 12 G1 G4;G5 17 G3 17 G3 G6 3 G5 5 F1 U1 32 F5 G2 13 F5 G2 2 G9 H8 1 H12 1 H12 1 H7 1 H9 H10

1 2 6 3 1 5 2 2 2 1 5 2 1 1 5 8 1 1 3 7 13 1 3 3 1 4 1 2 2 1 2 4 1 1 1 4 3 15 7 2 15 20 17 28 6 18 17 4 2 1 1 9

H12 H8 H1 H1 H5 H1 H1 H12 H12 H12 H1 H16 H16 G9 G9 I2 I3 J1 J1 J3 J4 J5 J6 J4 J6 I2 K1 K2 K3 K4 K5 K6 K6 K6 J3 K6 K6 M3 M3 G5 N6;N7 N6;N7 N1 N2 R6 I2 I2 N4 O1 O2 O1 O1

H4 H7 H5 H2;H13 H17 I3;K1 J1 J2 J4 L1 J8 J6 J9 K3 K3 K4 K5 K6 L4 L4 L4 M2 M1 N3 N4 P1 O1;P1 N2 N2 O2 O3 T3

9 9 2 4 2 6 3 7 3 4 10 12 3 1 4 0 2 2 1 1 9 1 3 1 8 9 3 3 1 1 1 4 3 2 1 1 2 4 9 1 1 1 1 1

O1 O1 O1 O1 O2 O10 O10 N4 P1 P2 Q1 Q2 Q3 Q3 P1 P1 P1 R3 R4 R5 S5 S1 S1 S1 Q1 T4 T1 O7 T3 G7 U1 U1 U3 V12 V1 V3 V4 V5 V6 V7 V7 V7 V10 V10

T3 T3 O11 P2 Q1 Q2 Q3 Q4 R4 R4 R4 R5 N5 N5 S1 S1 T2 T4 T1 U2 V1 V3 V4 V5 V6 V7 V8 V11 V11 V11 V2 V2

17

No

Uraian Pekerjaan

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Pembersihan Lapangan Pengukuran dan Pemasangan Bo Papan Nama Proyek Galian Tanah Sirtu Lantai Kerja Beton Plat Pondasi Balok RIB Urugan Kembali Beton Balok Sloof Beton Kolom Struktur Beton Balok Anak Beton Balok Induk Beton Plat Lantai Beton Plat Dask Canopy Beton Kolom Struktur Tangga Beton Water Proofing Daak Canopy Balok Ring Atas Beton Plat Daak Water Proofing Daak Canopy Pekerjaan Rangka Atap Urugan Pasir Bawah Pondasi + Pa Anstamping Pondasi Batu Belah 1:6 Beton Praktis Sloof Beton Praktis Kolom Saluran Terbuka U20 Bak Kontrol 45x45 Saluran Buis Beton Galian Tanah Pasir Urug Anstamping Beton Bertulang Dinding Bata 1:3 Plesteran 1:3 Pem. Pipa PVC, Pipa Hawa, Ijuk Pem. Batu Pecah+Kerikil, Dan Sir Urugan Tanah Kembali Beton Praktis Balok Latei

Durasi

Paling Awal

Paling Akhir

Float

(Hari) Mulai (Es) Akhir (Ef) Mulai (Ls) Akhir (Lf) Free Float 8 2 1 20 2 2 12 7 7 7 10 13 13 12 8 12 8 1 11 6 1 48 3 4 17 5 32 1 4 1 3 1 1 2 4 9 1 1 2 13

0 0 0 8 28 30 32 44 51 44 51 61 61 74 74 86 86 82 98 109 115 109 28 31 35 52 57 57 58 58 62 65 66 67 69 73 82 83 84 57

8 2 1 28 30 32 44 51 58 51 61 74 74 86 82 98 94 83 109 115 116 157 31 35 52 57 89 58 62 59 65 66 67 69 73 82 83 84 86 70

0 0 0 8 28 53 55 67 173 67 74 84 84 97 97 109 209 120 121 132 179 132 28 31 35 52 57 57 155 155 156 159 160 161 163 167 176 177 178 57

8 8 8 28 53 55 67 173 180 74 84 97 97 109 120 121 121 121 132 179 180 180 31 35 52 57 180 155 156 156 159 160 161 163 167 176 177 178 180 70

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77

Plafond Expose Aci Pekerjaan Kusen Plafond Asbes Plat List Tepi Kayu Profil Urug Pasir Bawah Lantai Lantai Rabat Beton Tritisan Lantai Keramik 20x20cm Lavator Dinding keramik 20x25 Lavatory Batu Tempel Dinding canopy Lantai Keramik Warna 40x40cm Lantai keramik Warna Untuk Tan Nosing Tangga Plint Lantai Jeglok Finish Cat M Pekerjaan Penerangan Pekerjaan Sanit Air Pekerjaan Cat-Cat an Beton Praktis Kolom Lt 2 Pasangan Batu 1:6 Beton Praktis Balok Latei Lt 2 Pasangan Bata 1:3 Plesteran 1:3 Plasteran 1:6 Pekerjaan Kusen Plesteran Beton Plafond Asbes Plat List Tepi Kayu Profil Pekerjaan Penerangan Pekerjaan Sanitasi Pekerjaan Cat-Cat an Pekerjaan Pasangan dan Dinding Urugan Tanah Peninggian Pasangan Rollag 1:3 Pasagan Batu Bata 1:3 Pasangan Batu Bata 1:6 Plesteran 1:3 Plestera 1:6 Plesteran Beton

1 11 5 8 1 1 3 7 3 13 1 1 3 10 5 24 18 20 17 17 17 28 8 6 2 3 5 20 4 29 5 3 11 12 17 17 3

70 70 70 75 83 84 84 87 94 94 107 108 108 83 93 98 83 101 83 101 118 118 146 146 146 148 148 153 173 151 52 57 60 60 72 72 89

71 81 75 83 84 85 87 94 97 107 108 109 111 93 98 122 101 121 100 118 135 146 154 152 148 151 153 173 177 180 57 60 71 72 89 89 92

70 70 70 75 83 153 153 156 163 163 176 177 177 83 117 122 83 101 83 101 118 118 146 146 146 148 148 156 176 151 52 145 148 148 160 160 177

118 118 75 83 153 156 156 163 176 176 177 180 180 117 122 146 101 146 101 118 146 146 180 180 148 151 156 176 180 180 145 148 180 160 180 177 180

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Float Total Float

0 2 1 0 23 23 23 122 122 23 23 23 23 23 38 23 27 38 23 64 64 23 0 0 0 0 91 97 94 97 94 94 94 94 94 94 94 94 94 0

47 37 0 0 69 71 69 69 79 69 69 71 69 24 24 24 0 25 101 0 11 0 26 28 0 0 3 3 3 0 88 88 109 88 91 88 88

No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Durasi (Hari) Pembersihan Lapangan 8 Pengukuran dan Pemasang 2 Papan Nama Proyek 1 Galian Tanah 20 Sirtu 2 Lantai Kerja 2 Beton Plat Pondasi 12 Balok RIB 7 Urugan Kembali 7 Beton Balok Sloof 7 Beton Kolom Struktur 10 Beton Balok Anak 13 Beton Balok Induk 13 Beton Plat Lantai 12 Beton Plat Dask Canopy 8 Beton Kolom Struktur 12 Tangga Beton 8 Water Proofing Daak Cano 1 Balok Ring Atas 11 Beton Plat Daak 6 Water Proofing Daak Cano 1 Pekerjaan Rangka Atap 48 Urugan Pasir Bawah Ponda 3 Anstamping 4 Pondasi Batu Belah 1:6 17 Beton Praktis Sloof 5 Beton Praktis Kolom 32 Saluran Terbuka U20 1 Bak Kontrol 45x45 4 Saluran Buis Beton 1 Galian Tanah 3 Pasir Urug 1 Anstamping 1 Beton Bertulang 2 Dinding Bata 1:3 4 Plesteran 1:3 9 Pem. Pipa PVC, Pipa Hawa, 1 Pem. Batu Pecah+Kerikil, 1 Urugan Tanah Kembali 2 Beton Praktis Balok Latei 13 Uraian Pekerjaan

Paling Awal Paling Akhir Mulai (Es) Akhir (Ef) Mulai (Ls) Akhir (Lf) 0 8 0 8 0 2 0 8 0 1 0 8 8 28 8 28 28 30 28 53 30 32 53 55 32 44 55 67 44 51 67 173 51 58 173 180 44 51 67 74 51 61 74 84 61 74 84 97 61 74 84 97 74 86 97 109 74 82 97 120 86 98 109 121 86 94 209 121 82 83 120 121 98 109 121 132 109 115 132 179 115 116 179 180 109 157 132 180 28 31 28 31 31 35 31 35 35 52 35 52 52 57 52 57 57 89 57 180 57 58 57 155 58 62 155 156 58 59 155 156 62 65 156 159 65 66 159 160 66 67 160 161 67 69 161 163 69 73 163 167 73 82 167 176 82 83 176 177 83 84 177 178 84 86 178 180 57 70 57 70

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77

Plafond Expose Aci Pekerjaan Kusen Plafond Asbes Plat List Tepi Kayu Profil Urug Pasir Bawah Lantai Lantai Rabat Beton Tritisa Lantai Keramik 20x20cm L Dinding keramik 20x25 La Batu Tempel Dinding cano Lantai Keramik Warna 40 Lantai keramik Warna Unt Nosing Tangga Plint Lantai Jeglok Finish Pekerjaan Penerangan Pekerjaan Sanit Air Pekerjaan Cat-Cat an Beton Praktis Kolom Lt 2 Pasangan Batu 1:6 Beton Praktis Balok Latei Pasangan Bata 1:3 Plesteran 1:3 Plasteran 1:6 Pekerjaan Kusen Plesteran Beton Plafond Asbes Plat List Tepi Kayu Profil Pekerjaan Penerangan Pekerjaan Sanitasi Pekerjaan Cat-Cat an Pekerjaan Pasangan dan Di Urugan Tanah Peninggian Pasangan Rollag 1:3 Pasagan Batu Bata 1:3 Pasangan Batu Bata 1:6 Plesteran 1:3 Plestera 1:6 Plesteran Beton

1 11 5 8 1 1 3 7 3 13 1 1 3 10 5 24 18 20 17 17 17 28 8 6 2 3 5 20 4 29 5 3 11 12 17 17 3

70 70 70 75 83 84 84 87 94 94 107 108 108 83 93 98 83 101 83 101 118 118 146 146 146 148 148 153 173 151 52 57 60 60 72 72 89

71 81 75 83 84 85 87 94 97 107 108 109 111 93 98 122 101 121 100 118 135 146 154 152 148 151 153 173 177 180 57 60 71 72 89 89 92

70 70 70 75 83 153 153 156 163 163 176 177 177 83 117 122 83 101 83 101 118 118 146 146 146 148 148 156 176 151 52 145 148 148 160 160 177

118 118 75 83 153 156 156 163 176 176 177 180 180 117 122 146 101 146 101 118 146 146 180 180 148 151 156 176 180 180 145 148 180 160 180 177 180

Float Free Float Total Float 0 0 0 2 0 1 0 0 0 23 0 23 0 23 0 122 0 122 0 23 0 23 0 23 0 23 0 23 0 38 0 23 0 27 0 38 0 23 0 64 0 64 0 23 0 0 0 0 0 0 0 0 0 91 0 97 0 94 0 97 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 94 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

47 37 0 0 69 71 69 69 79 69 69 71 69 24 24 24 0 25 101 0 11 0 26 28 0 0 3 3 3 0 88 88 109 88 91 88 88

Related Documents

Makon Terbaru Fix.xlsx
November 2019 8
Cv.ell Terbaru
July 2020 10
Cvku Terbaru
October 2019 28
Hosts Terbaru
October 2019 23
Terbaru Review
November 2019 17
Cvku Terbaru
October 2019 25

More Documents from ""