LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANADO Nomor Tanggal Tentang

: : : Penetapan Standarisasi Harga Satuan Jadi di lingkungan Dinas Pekerjaan Umum Kota Manado 2016

DAFTAR HARGA SATUAN UPAH

NO.

JENIS UPAH

HARGA per JAM Satuan (Rp.)

HARGA per HAR Satuan

1

Pekerja

Jam / Org

12,500.00

Hari / Org

2

Mandor

Jam / Org

15,000.00

Hari / Org

3

Tukang Batu

Jam / Org

15,625.00

Hari / Org

4

Tukang Besi

Jam / Org

15,625.00

Hari / Org

5

Tukang Cat

Jam / Org

15,625.00

Hari / Org

6

Tukang Las

Jam / Org

15,625.00

Hari / Org

7

Tukang

Jam / Org

15,625.00

Hari / Org

8

Tukang Kayu

Jam / Org

15,625.00

Hari / Org

9

Kepala Tukang

Jam / Org

18,750.00

Hari / Org

10

Instalatur

Jam / Org

18,750.00

Hari / Org

11

Mekanik/ Sopir

Jam / Org

18,750.00

Hari / Org

12

Operator/Masinis

Jam / Org

18,750.00

Hari / Org

13

Pembantu Operator / Mekanik

Jam / Org

15,625.00

Hari / Org

14

Pembantu Tukang / Penjaga

Jam / Org

15,625.00

Hari / Org

Catatan :

Satuan Jadi 2016

1 dari 1349

- Sesuai harga yang berlaku dipasaran. - Harga satuan belum termasuk pajak yang berlaku. - Harga sewaktu-waktu bisa berubah

Menyetujui, Plt. KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

Dibuat Oleh, CV. ELJIREH ABADI KONSULTAN

Ir. FERRY T. SIWI, M.Si

Ir. Gerell H. Tulungen, MMT

NIP. 19590626 199103 1 008

Direktur

Satuan Jadi 2016

2 dari 1349

MUM KOTA MANADO

HARGA per HARI (Rp.)

KET.

100,000.00 120,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 150,000.00 150,000.00 150,000.00 150,000.00 125,000.00 125,000.00

Satuan Jadi 2016

3 dari 1349

EH ABADI KONSULTAN

ell H. Tulungen, MMT

Satuan Jadi 2016

4 dari 1349

LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANADO Nomor Tanggal Tentang

: : : Penetapan Standarisasi Harga Satuan Jadi di lingkungan Dinas Pekerjaan Umum Kota Manado 2016

DAFTAR HARGA SATUAN UPAH (SWAKELOLA)

NO.

JENIS UPAH

HARGA per JAM Satuan (Rp.)

HARGA per HARI Satuan

1

Pekerja

Jam / Org

12,500.00

Hari / Org

2

Mandor

Jam / Org

15,000.00

Hari / Org

3

Tukang Batu

Jam / Org

15,625.00

Hari / Org

4

Tukang Besi

Jam / Org

15,625.00

Hari / Org

5

Tukang Cat

Jam / Org

15,625.00

Hari / Org

6

Tukang Las

Jam / Org

15,625.00

Hari / Org

7

Tukang

Jam / Org

15,625.00

Hari / Org

8

Tukang Kayu

Jam / Org

15,625.00

Hari / Org

9

Kepala Tukang

Jam / Org

18,750.00

Hari / Org

10

Instalatur

Jam / Org

18,750.00

Hari / Org

11

Mekanik/ Sopir

Jam / Org

18,750.00

Hari / Org

12

Operator/Masinis

Jam / Org

18,750.00

Hari / Org

13

Pembantu Operator / Mekanik

Jam / Org

15,625.00

Hari / Org

14

Pembantu Tukang / Penjaga

Jam / Org

15,625.00

Hari / Org

416470536.xlsx UPAH swakel

5 dari 1349

Catatan : - Sesuai harga yang berlaku dipasaran. - Harga satuan belum termasuk pajak yang berlaku. - Harga sewaktu-waktu bisa berubah

Menyetujui, Plt. KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

Dibuat Oleh, CV. ELJIREH ABADI KONSULTAN

Ir. FERRY T. SIWI, M.Si

Ir. Gerell H. Tulungen, MMT

NIP. 19590626 199103 1 008

Direktur

416470536.xlsx UPAH swakel

6 dari 1349

MUM KOTA MANADO

OLA) HARGA per HARI (Rp.)

KET.

100,000.00 120,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 150,000.00 150,000.00 150,000.00 150,000.00 125,000.00 125,000.00 416470536.xlsx UPAH swakel

7 dari 1349

EH ABADI KONSULTAN

ell H. Tulungen, MMT

416470536.xlsx UPAH swakel

8 dari 1349

DAFTAR HARGA DASAR SATUAN BAHAN No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

U RAIAN

Pasir Pasang (Sedang) Pasir Beton (Kasar) Pasir Halus (untuk HRS) Pasir Urug (ada unsur lempung) Batu Kali Agregat Pecah Kasar Agg. Halus LP A Agregat Lolos # 1 " Lolos screen1 ukuran ( 0 - 5) Lolos screen2 ukuran ( 0 - 5) Lolos screen2 ukuran ( 5 - 9,5) Lolos screen2 ukuran ( 9.5 - 19,0) Filler Batu Belah / Kerakal Gravel Bahan Tanah Timbunan Bahan Pilihan Aspal Kerosen / Minyak Tanah Semen / PC (50kg) Semen / PC (kg) Besi Beton Kawat Beton Kawat Bronjong Sirtu Cat Marka (Non Thermoplas) Cat Marka (Thermoplastic) Paku Kayu Perancah Bensin Solar Minyak Pelumas / Olie Plastik Filter Pipa Galvanis Dia. 1" Pipa Porus Agr.Base Kelas A Agr.Base Kelas B Agr.Base Kelas C Agr.Base Kelas C2 Geotextile Aspal Emulsi Gebalan Rumput Thinner

SATUAN

M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 Kg M3 M3 M3 M3 KG LITER Zak Kg Kg Kg Kg M3 Kg Kg Kg M3 LITER LITER LITER M2 M' M' M3 M3 M3 M3 M2 Kg M2 LITER

HARGA SATUAN ( Rp.) 213,000.00 260,700.00 234,300.00 205,000.00 260,700.00 337,983.91 337,983.91 308,439.30 215,365.96 420,978.60 308,439.30 228,054.09 1,500.00 262,400.00 290,600.00 60,000.00 75,000.00 12,000.00 8,383.00 63,498.75 1,269.98 11,440.00 23,100.00 20,790.00 195,900.00 95,060.00 126,710.00 20,220.00 2,200,000.00 8,599.00 7,775.00 35,000.00 15,000.00 100,000.00 40,000.00 485,646.60 420,682.37 319,316.63 110,000.00 12,000.00 30,000.00 23,100.00

KETERANGAN

Base Camp Base Camp Base Camp Base Camp Lokasi Pekerjaan Base Camp Base Camp Base Camp Base Camp Base Camp Base Camp Base Camp Proses/Base Camp Lokasi Pekerjaan Base Camp Borrow Pit/quarry Quarry Base Camp Base Camp Base Camp Base Camp Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Pertamina Pertamina Pertamina Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Base Camp Base Camp Base Camp Tidak tersedia Lokasi Pekerjaan Base Camp Lokasi Pekerjaan Lokasi Pekerjaan

44 45 46 47 48 49 50 51 52 53 54 55 56 57 58

Glass Bead Pelat Rambu (Eng. Grade) Pelat Rambu (High I. Grade) Rel Pengaman Beton K-250 Baja Tulangan (Polos) U24 Baja Tulangan (Ulir) D32 Kapur Chipping Chipping (kg) Cat tembok biasa Pemantul Cahaya (Reflector) Pasir Urug Arbocell Baja Bergelombang

Kg BH BH M' M3 Kg Kg M3 M3 Kg Kg Bh. M3 Kg. Kg

52,266.00 193,600.00 238,150.00 412,500.00 2,058,223.38 11,440.00 13,315.00 245,460.00 2,261,760.00 1,200.00 43,330.00 27,000.00 205,000.00 36,960.00 24,504.75

Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Hasil Proses Base Camp Base Camp Base Camp Base Camp Base Camp Base Camp Lokasi Pekerjaan

59

Beton K-125

M3

1,136,905.08 Lokasi Pekerjaan

60

Baja Struktur

Kg

11,000.00 Pelabuhan terdekat

61

Tiang Pancang Baja

M'

25,247.37 Lokasi Pekerjaan

62

Tiang Pancang Beton Pratekan

M'

423,957.93 Pelabuhan terdekat

63

Kawat Las

Dos

64

Pipa Baja

Kg

65

Minyak Fluks

Liter

2,394.00 Base Camp

66

Bunker Oil

Liter

2,630.00 Base Camp

67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94

Asbuton Halus Baja Prategang Baja Tulangan (Polos) U32 Baja Tulangan (Ulir) D39 Baja Tulangan (Ulir) D48 PCI Girder L=17m PCI Girder L=21m PCI Girder L=26m PCI Girder L=32m PCI Girder L=36m PCI Girder L=41m Beton K-300 Beton K-175 Cerucuk Elastomer Bahan pengawet: kreosot Mata Kucing Anchorage Anti strpping agent Bahan Modifikasi Beton K-500 Beton K-400 Ducting (Kabel prestress) Ducting (Strand prestress) Beton K-350 Multipleks 12 mm Elastomer jenis 1 Elastomer jenis 2

Ton Kg Kg Kg Kg Buah Buah Buah Buah Buah Buah M3 M3 M buah liter buah buah Kg Kg M3 M3 M' M' M3 Lbr buah buah

225,000.00 Lokasi Pekerjaan 19,060.00 Pelabuhan terdekat

6,861,860.00 13,860.00 12,815.00 13,315.00 13,815.00 148,995,000.00 168,052,500.00 214,830,000.00 272,002,500.00 291,060,000.00 332,640,000.00 2,200,182.74 2,023,647.67 17,330.00 825,830.00 5,780.00 86,630.00 1,538,460.00 57,750.00 1,160.00 2,806,574.63 2,663,454.70 173,250.00 57,750.00 2,596,348.33 209,640.00 489,780.00 825,830.00

Base Camp Base Camp Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Pelabuhan terdekat Pelabuhan terdekat Pelabuhan terdekat Pelabuhan terdekat Pelabuhan terdekat Pelabuhan terdekat Lokasi Pekerjaan Lokasi Pekerjaan

Base Camp Base Camp

95 96 97 98 99 100 101 102 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123

Elastomer jenis 3 Expansion Tipe Joint Asphaltic Plug Expansion Join Tipe Rubber Expansion Join Baja Siku Marmer Kerb Type A Paving Block Mini Timber Pile Matras Concrete Assetilline Oxygen Batu Bara Pipa Galvanis Dia 3" Pipa Galvanis Dia 1,5" Agregat Pecah Mesin 0-5 mm Agregat Pecah Mesin 5-10 & 10-20 mm Agregat Pecah Mesin 20-30 mm Joint Sealent Cat Anti Karat Expansion Cap Polytene 125 mikron Curing Compound Kayu Acuan Additive

buah M M M Buah Buah Buah Buah Buah Botol Botol Kg M M M3 M3 M3 Kg Kg M2 Kg Ltr M3 Ltr

1,064,680.00 1,188,260.00 1,386,000.00 317,630.00 346,500.00 51,980.00 5,200.00 27,000.00 467,780.00 265,080.00 132,540.00 690.00 460,000.00 75,000.00 420,978.60 308,439.30 228,054.09 39,390.00 42,390.00 6,050.00 19,250.00 38,500.00 2,200,000.00 38,500.00

Base Camp Base Camp Base Camp Base Camp Base Camp Base Camp Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan Lokasi Pekerjaan

124 125 126 128 129 130 131 132 133 134 135 136 183

Casing Pasir Tailing Polimer Kerb jenis 1 Kerb jenis 2 Kerb jenis 3 Bahan Modifikasi Aditif anti pengelupasan Bahan Pengisi (Filler) Tambahan Asbuton yang diproses Elastomer Alam Elastomer Sintesis

Menyetujui, Plt. KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

Ir. FERRY T. SIWI, M.Si NIP. 19590626 199103 1 008

M2 M3 KG Buah Buah Buah Kg Kg Kg Kg Kg Kg

9,000.00 259,000.00 Base Camp 45,000.00 Base Camp 45,000.00 50,000.00 55,000.00 75,000.00 30,000.00 1,269.98 8,100.00 53,200.00 53,200.00

Dibuat Oleh, CV. ELJIREH ABADI KONSULTA

Ir. Gerell H. Tulungen, MMT Direktur

CV. ELJIREH ABADI KONSULTAN

Ir. Gerell H. Tulungen, MMT

LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MA Nomor Tanggal Tentang

: : : Penetapan Standardisasi Harga Satuan Jadi di lingkungan Dinas Pekerjaan Umum Kota Manado 2016

DAFTAR HARGA SATUAN JADI

No. Mata Pembayaran

Uraian

Satuan

Perkiraan Kuantitas

a

b

c

d

1.2 1.8.(1) 1.8.(2) 1.17 1.20.(1) 1.20.(2) 1.21

DIVISI 1. UMUM Mobilisasi Manajemen dan Keselamatan Lalu Lintas Jembatan Sementara Pengamanan Lingkungan Hidup Pengeboran, termasuk SPT dan Laporan Sondir termasuk Laporan Manajemen Mutu

LS LS LS LS M1 M1 LS

1.00 1.00 24.00 24.00

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

2.1.(1) 2.2.(1)

DIVISI 2. DRAINASE Galian untuk Selokan Drainase dan Saluran Air Pasangan Batu dengan Mortar

M3 M3

1.00 1.00

2.3.(1)

Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 45 cm

M1

1.00

2.3.(2)

Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm

M1

1.00

2.3.(3)

Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 85 cm

M1

1.00

2.3.(4)

Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 105 cm

M1

1.00

2.3.(5)

Gorong2 Pipa Baja Bergelombang

Ton

1.00

2.3.(6)

Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm

M1

1.00

2.3.(7)

Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm

M1

1.00

Satuan Jadi 2016

Halaman 14 dari 1349 halaman

2.3.(8)

Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm

M1

1.00

2.3.(9) 2.3.(10) 2.3.(11)

Saluran berbentuk U Tipe DS 1 Saluran berbentuk U Tipe DS 2 Saluran berbentuk U Tipe DS 3

M1 M1 M1

1.00 1.00 1.00

2.3.(12)

Beton K250 (fc’ 20) untuk struktur drainase beton minor

M3

1.00

2.3.(13) 2.3.(14) 2.4.(1) 2.4.(2)

Baja Tulangan untuk struktur drainase beton minor Pasangan Batu tanpa Adukan (Aanstamping) Bahan Porous untuk Bahan Penyaring (Filter) Anyaman Filter Plastik

Kg M3 M3 M2

1.00 1.00 1.00 1.00

2.4.(3)

Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan

M1

1.00

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

3.1.(1a) 3.1.(1b) 3.1.(2) 3.1.(3) 3.1.(4) 3.1.(5)

DIVISI 3. PEKERJAAN TANAH Galian Biasa Galian Batu Lunak Galian Batu Galian Struktur dengan kedalaman 0 - 2 meter Galian Struktur dengan kedalaman 2 - 4 meter Galian Struktur dengan kedalaman 4 - 6 meter

M3 M3 M3 M3 M3 M3

1.00 1.00 1.00 1.00 1.00 1.00

3.1.(6)

Galian Perkerasan Beraspal dengan Cold Milling Machine

M3

1.00

3.1.(7)

Galian Perkerasan Beraspal tanpa Cold Milling Machine

M3

1.00

3.1.(8)

Galian Perkerasan berbutir

M3

1.00

Satuan Jadi 2016

Halaman 15 dari 1349 halaman

3.1.(9). 3.2.(1a) 3.2.(1b) 3.2.(2a) 3.2.(2b) 3.2.(3a) 3.2.(3b) 3.3.(1) 3.4.(1) 3.4.(2) 3.4.(3) 3.4.(4) 3.4.(5) 3.5.(1)

Galian Perkerasan Beton Timbunan Biasa dari sumber galian Timbunan Biasa dari galian Timbunan Pilihan dari sumber galian Timbunan Pilihan dari galian Timbunan Pilihan (diukur diatas bak truk) Timbunan Pilihan (diukur dengan rod & plate) Penyiapan Badan Jalan Pembersihan dan Pengupasan Lahan Pemotongan Pohon Pilihan diameter 15 – 30 cm Pemotongan Pohon Pilihan diameter 30 – 50 cm Pemotongan Pohon Pilihan diameter 50 – 75 cm Pemotongan Pohon Pilihan diameter > 75 cm Geotekstil Filter untuk Drainage Bawah Permukaan (Kelas 2)

3.5.(2a) 3.5.(2b) 3.5.(2c) 3.5.(3)

Geotekstil Separator Kelas 1 Geotekstil Separator Kelas 2 Geotekstil Separator Kelas 3 Geotekstil Stabilisator (Kelas 1)

M3 M3 M3 M3 M3 M3 M3 M2 M2 buah buah buah buah

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

M2

1.00

M2 M2 M2 M2

1.00 1.00 1.00 1.00

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN 4.2.(1) 4.2.(2a) 4.2.(2b) 4.2.(3) 4.2.(4) 4.2.(5) 4.2.(6) 4.2.(7) 4.2.(8) 4.2.(9) 4.2.(10) 4.2.(11) 4.2.(12) 4.2.(13) 4.2.(14) 4.2.(15) 4.2.(16)

Lapis Pondasi Agregat Kelas A Lapis Pondasi Agregat Kelas B Lapis Pondasi Agregat Kelas S Semen untuk Lapis Pondasi Semen Tanah Lapis Pondasi Semen Tanah Agregat Penutup BURTU Bahan Aspal untuk Pekerjaan Pelaburan Lapis Resap Pengikat Lapis Resap Perekat Laston Lapis Antara (AC-BC) Laston Lapis Antara Modifikasi (AC-BC Mod) Laston Lapis Pondasi (AC-Base) Laston Lapis Pondasi Modifikasi (AC-Base Mod) Bahan anti pengelupasan Perkerasan Beton Semen Perkerasan Beton Semen dengan anyaman Tulangan Tunggal Lapis Pondasi Bawah Beton Kurus

M3 M3 M3 Ton M3 M2 Liter Liter Liter Ton Ton Ton Ton Kg M3

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

M3

1.00

M3

1.00

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Satuan Jadi 2016

Halaman 16 dari 1349 halaman

5.1.(1) 5.1.(2) 5.2,(1) 5.2,(2) 5.3.(1)

DIVISI 5. PERKERASAN BERBUTIR Lapis Pondasi Agregat Kelas A Lapis Pondasi Agregat Kelas B Lapis Permukaan Agregat Tanpa Penutup Aspal Lapis Pondasi Agregat Tanpa Penutup Aspal Perkerasan Beton Semen

M3 M3 M3 M3 M3

1.00 1.00 1.00 1.00 1.00

5.3.(2)

Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal

M3

1.00

5.3.(3) 5.4.(1) 5.4.(2)

Lapis Pondasi bawah Beton Kurus Semen untuk Lapis Pondasi Semen Tanah Lapis Pondasi Semen Tanah

M3 Ton M3

1.00 1.00 1.00

5.5.(1)

Lapis Pondasi Agregat Semen Kelas A (Cement Treated Base) (CTB)

M3

1.00

5.5.(2)

Lapis Pondasi Agregat Semen Kelas B (Cement Treated Sub Base) (CTSB)

M3

1.00

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

6.1 (1)(a) 6.1 (1)(b) 6.1 (2)(a) 6.1 (2)(b) 6.1 (2)(c) 6.2 (1) 6.2 (2)

Satuan Jadi 2016

DIVISI 6. PERKERASAN ASPAL Lapis Resap Pengikat - Aspal Cair Lapis Resap Pengikat - Aspal Emulsi Lapis Perekat - Aspal Cair Lapis Perekat - Aspal Emulsi Lapis Perekat - Aspal Emulsi Modifikasi Agregat Penutup BURTU Agregat Penutup BURDA

Liter Liter Liter Liter Liter M2 M2

1.00 1.00 1.00 1.00 1.00 1.00 1.00

Halaman 17 dari 1349 halaman

6.2 (3a) 6.2 (3b) 6.2 (4a) 6.2 (4b) 6.2 (4c) 6.2 (4d) 6.3 (1) 6.3 (2)

Liter Liter Liter Liter Liter Kg Ton Ton

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

6.3(3a)

Bahan Aspal untuk Pekerjaan Pelaburan Bahan Aspal Modifikasi untuk Pekerjaan Pelaburan Aspal Cair Emulsi untuk Precoated Aspal Emulsi untuk Precoated Aspal Emulsi Modifikasi untuk Precoated Bahan anti pengelupasan Latasir Kelas A (SS-A) Latasir Kelas B (SS-B) Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang)

Ton

1.00

6.3(3b)

Lataston Lapis Aus Perata (HRS-WC(L)) (gradasi senjang/semi senjang)

Ton

1.00

6.3.(4a)

Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang)

Ton

1.00

6.3.(4b)

Ton

1.00

Ton Ton Ton Ton Ton Ton Ton

1.00 1.00 1.00 1.00 1.00 1.00 1.00

Ton

1.00

6.3(7a) 6.3(7b) 6.3(7c)

Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi senjang) Laston Lapis Aus (AC-WC) Laston Lapis Aus Modifikasi (AC-WC Mod) Laston Lapis Aus Perata (AC-WC(L)) Laston Lapis Aus Modifikasi Perata (AC-WC(L)Mod) Laston Lapis Antara (AC-BC) Laston Lapis Antara Modifikasi (AC-BC Mod) Laston Lapis Antara Perata (AC-BC(L) Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) Leveling Laston Lapis Pondasi (AC-Base) Laston Lapis Pondasi Modifikasi (AC-Base Mod) Laston Lapis Pondasi Perata (AC-Base(L))

Ton Ton Ton

1.00 1.00 1.00

6.3(7d)

Laston Lapis Pondasi Modifikasi Perata (AC-Base(L)Mod)

Ton

1.00

6.3.(8) 6.5.(1) 6.6.(1) 6.6.(2)

Bahan anti pengelupasan Campuran Aspal Dingin untuk Pelapisan Lapis Permukaan Penetrasi Macadam Lapis Pondasi/Perata Penetrasi Macadam

Kg M3 M3 M3

1.00 1.00 1.00 1.00

6.3(5a) 6.3(5b) 6.3(5c) 6.3(5d) 6.3(6a) 6.3(6b) 6.3(6c) 6.3(6d)

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

7.1 (2) 7.1 (4) 7.1 (5) a 7.1 (6) 7.1 (7) a 7.1 (8) 7.1 (9) 7.1 (10)

DIVISI 7. STRUKTUR Beton mutu tinggi fc’45 Mpa Beton mutu tinggi fc’35 Mpa Beton mutu sedang fc’30 MPa lantai jembatan Beton mutu sedang fc’25 Mpa Beton mutu sedang fc’20 MPa Beton mutu rendah fc’15 MPa Beton Siklop fc’15 Mpa Beton mutu rendah fc’10 Mpa

7.2 (1a)

Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter

Satuan Jadi 2016

M3 M3 M3 M3 M3 M3 M3 M3

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Buah

1.00

Halaman 18 dari 1349 halaman

7.2 (1b)

Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter

Buah

1.00

7.2 (2a)

Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter

Buah

1.00

7.2 (2b)

Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter

Buah

1.00

7.2 (2c)

Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang … meter

Buah

1.00

7.2 (3)a

Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter

Buah

1.00

7.2 (4)a

Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter

Buah

1.00

7.2 (4)b

Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter

Buah

1.00

7.2.(7)

Kg

1.00

7.2.(8)

Baja Prategang Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter

Buah

1.00

7.2.(9)

Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter

Buah

1.00

7.2.(10)

Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pengecoran (post tension) Baja Tulangan U 24 Polos Baja Tulangan U 32 Polos Baja Tulangan U 32 Ulir Baja Tulangan U 39 Ulir Baja Tulangan U 48 Ulir Anyaman Kawat Yang Dilas (Welded Wire Mesh) Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa)

m3

1.00

Kg Kg Kg Kg Kg Kg Kg Kg

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

7.3 (1) 7.3 (2) 7.3 (3) 7.3 (4) 7.3 (5) 7.3 (6) 7.4 (1) a 7.4 (1) b

Satuan Jadi 2016

Halaman 19 dari 1349 halaman

7.4 (1) c 7.4 (2) a 7.4 (2) b 7.4 (2) c 7.5 (1) 7.5 (2)

Penyediaan Baja Struktur BJ …. (Titik Leleh ….. MPa) Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Pemasangan Baja Struktur BJ …. (Titik Leleh ….. MPa) Pemasangan jembatan Rangka Baja Pengangkutan Bahan Jembatan

Kg Kg Kg Kg Kg Kg

1.00 1.00 1.00 1.00 1.00 1.00

7.6 (1)

Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk

M1

1.00

7.6 (2) 7.6 (3) 7.6 (4) 7.6 (5)

M2 M2 M2 M2

1.00 1.00 1.00 1.00

7.6 (6)

Dinding Turap Kayu Tanpa Pengawetan Dinding Turap Kayu Dengan Pengawetan Dinding Turap Baja Dinding Turap Beton Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm

M1

1.00

7.6 (7)

Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm

M1

1.00

7.6 (8) a

Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 10 mm

M1

1.00

7.6 (8) b

Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal … mm

M1

1.00

7.6 (8) c

Penyediaan Tiang Pancang Baja Diameter ….. mm dengan tebal ... mm

M1

1.00

Pemancangan Tiang Pancang Kayu Ukuran …. mm Pemancangan Tiang Pancang Baja Diameter 500 mm Pemancangan Tiang Pancang Baja Diameter ..… mm Tiang Bor Beton, diameter 800 mm Tiang Bor Beton, diameter ….. mm

M1 M1 M1 M1 M1

1.00 1.00 1.00 1.00 1.00

Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18) bila Tiang Pancang dikerjakan di Tempat Yang Berair. Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) bila Tiang Bor Beton dikerjakan di Tempat Yang Berair. Pasangan Batu Pasangan Batu Kosong yang Diisi Adukan Pasangan Batu Kosong Bronjong dengan kawat yang dilapisi galvanis Sandaran (Railing) Papan Nama Jembatan Pembongkaran Pasangan Batu Pembongkaran Beton Pembongkaran Beton Pratekan Pembongkaran Bangunan Gedung Pembongkaran Rangka Baja Pembongkaran Balok Baja (Steel Stringers) Pembongkaran Lantai Jembatan Kayu Pembongkaran Jembatan Kayu

M1

1.00

M1

1.00

M3 M3 M3 M3 M1 buah M3 M3 M3 M2 M2 M' M2 M2

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

7.6 (13) 7.6 (14) a 7.6 (14) b 7.6 (19) a 7.6 (19) b 7.6 (20)

7.6 (21) 7.9.(1) 7.10.(1) 7.10.(2) 7.10.(3) a. 7.13.(1) 7.14.(1) 7.15.(1) 7.15.(2) 7.15.(3) 7.15.(4) 7.15.(5) 7.15.(6) 7.15.(7) 7.15.(8)

Satuan Jadi 2016

Halaman 20 dari 1349 halaman

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.1 (1)

Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor

M3

1

8.1 (2)

Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor

M3

1

8.1 (3)

Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor

M3 (vol. gembur)

1

8.1 (4)

Waterbound Macadam untuk Pekerjaan Minor

M3

1

8.1 (5) 8.1 (6) 8.1 (7) 8.1 (8) 8.1 (9)

Campuran Aspal Panas untuk Pekerjaan Minor Lasbutag atau Latasbusir untuk Pekerjaan Minor Penetrasi Macadam untuk Pekerjaan Minor Campuran Aspal Dingin untuk Pekerjaan Minor Residu Bitumen untuk Pekerjaan Minor

M M3 M3 M3 Liter

1 1 1 1 1

Satuan Jadi 2016

3

Halaman 21 dari 1349 halaman

8.2.(1) 8.3.(1a) 8.3.(1b) 8.3.(2) 8.3.(3) 8.4.(1) 8.4.(2)

Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya Stabilisasi dengan Tanaman Stabilisasi dengan Tanaman VS Semak / Perdu…………………. Pohon Jenis ……………………. Marka Jalan Termoplastik Marka Jalan Bukan Termoplastik

M3 M2 M2 M2 Buah M2 M2

1 1 1 1 1 1 1

8.4.(3a)

Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade

Buah

1

8.4.(3b)

Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade

Buah

1

8.4.(4a)

Rambu Jalan Tunggal dengan Pemantul High Intensity Grade

Buah

1

8.4.(4b)

Rambu Jalan Ganda dengan Pemantul High Intensity Grade

Buah

1

8.4.(5) 8.4.(6a) 8.4.(6b) 8.4.(7) 8.4.(8) 8.4.(9) 8.4.(10a) 8.4.(10b) 8.4.(10c)

Patok Pengarah Patok Kilometer Patok Hektometer Rel Pengaman Paku Jalan Mata Kucing Kerb Pracetak Jenis 1 (Peninggi/Mountable) Kerb Pracetak Jenis 2 (Penghalang/Barrier) Kerb Pracetak Jenis 3 (Kerb Berparit/Gutter)

Buah Buah Buah M1 Buah Buah M1 M1 M1

1 1 1 1 1 1 1 1 1

8.4.(10d)

Kerb Pracetak Jenis 4 (Penghalang Berparit / Barrier Gutter) t = 20 cm

M1

1

8.4.(10e)

M1

1

8.4.(10f)

Kerb Pracetak Jenis 5 (Penghalang Berparit / Barrier Gutter) t = 30 cm Kerb Pracetak Jenis 6 (Kerb dengan Bukaan)

Buah

1

8.4.(10g)

Kerb Pracetak Jenis 7a (Kerb pada Pelandaian Trotoar)

Buah

1

8.4.(11) 8.4.(12) 8.5(1) 8.5(2)

Kerb yang digunakan kembali Perkerasan Blok Beton pada Trotoar dan Median Pengembalian Kondisi Lantai Jembatan Beton Pengembalian Kondisi Lantai Jembatan Kayu

M1 M2 M2 M2

1 1 1 1

8.5(3)

Pengembalian Kondisi Pelapisan Permukaan Baja Struktur

M2

1

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

9.1.(1) 9.1.(2) 9.1.(3) 9.1.(4) a 9.1.(4) b 9.1.(5) a

Satuan Jadi 2016

DIVISI 9. PEKERJAAN HARIAN Mandor Pekerja Biasa Tukang Kayu, Tukang Batu, dsb Dump Truck, kapasitas 3 - 4 m³ Dump Truck, kapasitas 6 - 8 m³ Truk Bak Datar 3 - 4 ton

Jam Jam Jam Jam Jam Jam

1 1 1 1 1 1

Halaman 22 dari 1349 halaman

9.1.(5) b 9.1.(6) 9.1.(7) 9.1.(8) 9.1.(9) 9.1.(10) 9.1.(11) 9.1.(12) 9.1.(13) 9.1.(14) 9.1.(15) 9.1.(16) 9.1.(17) 9.1.(18) 9.1.(19) 9.1.(20)

Truk Bak Datar 6 - 8 ton Truk Tangki 3000 - 4500 Liter Bulldozer 100 - 150 PK Motor Grader min 100 PK Loader Roda Karet 1.0 - 1.6 M3 Loader Roda Berantai 75 - 100 PK Alat Penggali (Excavator) 80 - 140 PK Crane 10 - 15 Ton Penggilas Roda Besi 6 - 9 Ton Penggilas Bervibrasi 5 - 8 Ton Pemadat Bervibrasi 1.5 - 3.0 PK Penggilas Roda Karet 8 - 10 Ton Kompresor 4000 - 6500 Ltr/mnt Mesin Pengaduk beton (Molen) 0.3 - 0.6 M3 Pompa Air 70 - 100 mm Jack Hammer

Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Satuan Jadi 2016

Halaman 23 dari 1349 halaman

10.1 (1)

10.1 (2) 10.1 (3) 10.1 (4)

10.1 (5)

DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN Pemeliharaan Rutin Perkerasan Galian Biasa Patching/Penambalan Lubang Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor Pemeliharaan Rutin Bahu Jalan Pemotongan Rumput Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan Pembersihan Sampah,Tanah/Pasir dari Saluran Pemeliharaan Rutin Perlengkapan Jalan Pengecatan Perawatan Rambu Lalu lintas Perawatan Patok Pengarah Pemeliharaan Rutin Jembatan Pengecatan

LS M3 M2 M3 LS M2

1 1 1 1 1 1

LS

1

M3 LS M2 Bh Bh LS M2

1 1 1 1 1 1 1

Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Menyetujui, Plt. KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

Ir. FERRY SIWI, M.Si NIP. 19590626 199103 1 008

Satuan Jadi 2016

CV. EL

Ir. G

Halaman 24 dari 1349 halaman

LA DINAS PEKERJAAN UMUM KOTA MANADO

GA SATUAN JADI

Harga Satuan (Rupiah) e

37,750,000.00 175,830,000.00 173,848,644.51 40,080,000.00 609,583.33 285,541.67 231,600,000.00

Jumlah Harga-Harga (Rupiah) f = (d x e)

37,750,000.00 173,848,644.51 14,630,000.00 6,853,000.00 -

233,081,644.51

Satuan Jadi 2016

86,285.46 838,815.58

86,285.46 838,815.58

776,482.37

776,482.37

1,096,098.76

1,096,098.76

2,284,884.85

2,284,884.85

2,872,013.36

2,872,013.36

34,799,371.42

34,799,371.42

247,688.19

247,688.19

279,119.76

279,119.76

Halaman 25 dari 1349 halaman

310,746.50

310,746.50

439,207.00 512,408.00 614,889.00

439,207.00 512,408.00 614,889.00

1,536,587.86

1,536,587.86

18,307.03 450,879.00 442,123.08 52,382.50

18,307.03 450,879.00 442,123.08 52,382.50

91,159.13

91,159.13

47,749,448.84

Satuan Jadi 2016

77,241.46 181,821.51 378,802.73 18,229.58 778,714.64 782,731.30

77,241.46 181,821.51 378,802.73 18,229.58 778,714.64 782,731.30

226,501.07

226,501.07

986,230.31

986,230.31

172,059.95

172,059.95

Halaman 26 dari 1349 halaman

202,496.33 134,978.28 160,335.06 221,950.61 75,693.09 240,171.61 240,171.61 8,591.78 85,370.89 13,971,561.27 234,415.48 332,303.18 673,192.87

202,496.33 134,978.28 160,335.06 221,950.61 75,693.09 240,171.61 240,171.61 8,591.78 85,370.89 13,971,561.27 234,415.48 332,303.18 673,192.87

6,585.14

6,585.14

6,585.14 6,585.14 6,585.14 6,585.14

6,585.14 6,585.14 6,585.14 6,585.14

20,216,490.29

1,124,302.99 1,021,364.10 626,681.24 1,907,674.19 197,665.40 50,673.52 15,571.77 16,809.00 20,852.76 1,752,055.64 1,370,982.05 1,408,881.32 1,268,893.48 57,750.00 1,644,423.60

1,124,302.99 1,021,364.10 626,681.24 1,907,674.19 197,665.40 50,673.52 15,571.77 16,809.00 20,852.76 1,752,055.64 1,370,982.05 1,408,881.32 1,268,893.48 57,750.00 1,644,423.60

2,196,976.12

2,196,976.12

1,079,452.76

1,079,452.76

4,960,742.21

Satuan Jadi 2016

Halaman 27 dari 1349 halaman

1,230,911.93 1,111,759.65 520,234.92 630,326.60 1,644,423.60

1,230,911.93 1,111,759.65 520,234.92 630,326.60 1,644,423.60

2,196,976.12

2,196,976.12

1,079,452.76 1,742,147.00 170,615.36

1,079,452.76 1,742,147.00 170,615.36

279,429.53

279,429.53

292,143.44

292,143.44

10,898,420.93

16,809.00 14,532.08 20,852.76 8,850.85 14,297.96 52,854.70 82,404.94

Satuan Jadi 2016

16,809.00 14,532.08 20,852.76 8,850.85 14,297.96 52,854.70 82,404.94

Halaman 28 dari 1349 halaman

14,280.63 652.57 35,198.33 55,436.47 54,781.27 57,750.00 76,061.31 1,362,749.63

14,280.63 652.57 35,198.33 55,436.47 54,781.27 57,750.00 76,061.31 1,362,749.63

1,671,189.76

1,671,189.76

1,671,189.76

1,671,189.76

1,462,596.80

1,462,596.80

1,462,596.80

1,462,596.80

1,881,401.39 1,241,514.20 1,521,355.37 1,334,073.47 1,752,055.64 1,370,982.05 1,541,886.77

1,881,401.39 1,241,514.20 1,521,355.37 1,334,073.47 1,752,055.64 1,370,982.05 1,541,886.77

1,370,982.05

1,370,982.05

1,408,881.32 1,268,893.48 1,408,881.32

1,408,881.32 1,268,893.48 1,408,881.32

1,268,893.48

1,268,893.48

57,750.00 3,161,615.01 2,314,833.05 2,418,056.06

57,750.00 3,161,615.01 2,314,833.05 2,418,056.06

33,457,140.28

Satuan Jadi 2016

3,227,560.83 3,062,972.90 2,985,800.58 2,530,210.15 2,366,956.88 2,327,194.82 1,352,262.08 1,307,440.85

3,227,560.83 3,062,972.90 2,985,800.58 2,530,210.15 2,366,956.88 2,327,194.82 1,352,262.08 1,307,440.85

17,250,000.00

17,250,000.00

Halaman 29 dari 1349 halaman

Satuan Jadi 2016

23,000,000.00

23,000,000.00

46,316,973.36

46,316,973.36

74,253,289.53

74,253,289.53

81,436,552.16

81,436,552.16

17,250,000.00

17,250,000.00

1,341,445.68

1,341,445.68

1,341,445.68

1,341,445.68

317,989.89

317,989.89

21,077,442.26

21,077,442.26

23,876,486.30

23,876,486.30

1,233,924.97

1,233,924.97

17,671.76 18,327.55 20,508.53 20,225.05 20,340.05 73,653.48 13,012.33 13,012.33

17,671.76 18,327.55 20,508.53 20,225.05 20,340.05 73,653.48 13,012.33 13,012.33

Halaman 30 dari 1349 halaman

Satuan Jadi 2016

362.33 1,028.42 1,028.42 1,028.42 1,161.82 636.78

362.33 1,028.42 1,028.42 1,028.42 1,161.82 636.78

76,197.36

76,197.36

94,953.31 93,387.94 38,937.20 521,665.05

94,953.31 93,387.94 38,937.20 521,665.05

94,953.31

94,953.31

85,976.19

85,976.19

200,263.09

200,263.09

200,263.09

200,263.09

235,112.50

235,112.50

233,468.66 77,822.89 77,822.89 2,349,951.45 3,662,662.18

233,468.66 77,822.89 77,822.89 2,349,951.45 3,662,662.18

4,572.30

4,572.30

27,202.04

27,202.04

757,698.20 921,702.10 471,373.50 659,691.75 44,620.00 368,000.00 413,192.53 689,234.81 340,880.87 125,567.47 443,548.18 291,420.63 138,710.89 299,233.13

757,698.20 921,702.10 471,373.50 659,691.75 44,620.00 368,000.00 413,192.53 689,234.81 340,880.87 125,567.47 443,548.18 291,420.63 138,710.89 299,233.13

Halaman 31 dari 1349 halaman

342,098,031.71

Satuan Jadi 2016

946,492.17

946,492.17

902,564.95

902,564.95

647,936.25

647,936.25

1,004,839.16

1,004,839.16

3,682,389.89 7,733,898.37 2,326,880.86 3,010,859.09 15,325.36

3,682,389.89 7,733,898.37 2,326,880.86 3,010,859.09 15,325.36

Halaman 32 dari 1349 halaman

130,315.70 46,805.00 14,970.15 46,230.00 42,780.00 394,761.99 323,786.86

130,315.70 46,805.00 14,970.15 46,230.00 42,780.00 394,761.99 323,786.86

436,360.27

436,360.27

661,042.89

661,042.89

487,592.77

487,592.77

761,465.27

761,465.27

190,179.33 676,506.12 302,429.98 841,459.74 219,891.27 296,262.77 166,967.24 187,501.56 196,135.91

190,179.33 676,506.12 302,429.98 841,459.74 219,891.27 296,262.77 166,967.24 187,501.56 196,135.91

230,770.24

230,770.24

275,934.49

275,934.49

91,026.74

91,026.74

874,808.47

874,808.47

76,901.64 116,189.73 144,490.32 406,329.17

76,901.64 116,189.73 144,490.32 406,329.17

86,201.48

86,201.48

28,997,283.19

Satuan Jadi 2016

19,714.29 16,428.57 20,535.71 331,054.38

19,714.29 16,428.57 20,535.71 331,054.38

526,185.84

526,185.84

Halaman 33 dari 1349 halaman

280,383.10 818,854.50 758,785.16 Err:511 331,562.73 647,671.39 718,768.98 526,307.38 465,651.27 67,390.34 488,005.60 198,514.37 201,514.58 59,310.93 54,273.42

280,383.10 818,854.50 758,785.16 Err:511 331,562.73 647,671.39 718,768.98 526,307.38 465,651.27 67,390.34 488,005.60 198,514.37 201,514.58 59,310.93 54,273.42

7,144,944.99

Satuan Jadi 2016

Halaman 34 dari 1349 halaman

63,877,709.20 77,241.46 273,795.20 902,564.95 55,912,660.88 1,045.95

63,877,709.20 77,241.46 273,795.20 902,564.95 55,912,660.88 1,045.95

48,004,444.53

48,004,444.53

165,474.44 8,930,945.33 53,371.50 189,563.13 208,737.78 61,304,881.55 53,371.50

165,474.44 8,930,945.33 53,371.50 189,563.13 208,737.78 61,304,881.55 53,371.50

239,955,807.41

Dibuat Oleh, CV. ELJIREH ABADI KONSULTAN

Ir. Gerell H. Tulungen, MMT Direktur

Satuan Jadi 2016

Halaman 35 dari 1349 halaman

DISCLAIMER Software ini merujuk pada Pedoman AHS Bidang Pekerjaan Umum dan Spesifikasi Umum 2010 Revisi 3 Software ini hanya sebagai

alat bantu perhitungan analisa harga satuan dan berisi cont

yang tidak bisa mewakili kebutuhan lapangan di seluruh Indonesia. Dalam penerapannya, perhitungan harga satuan harus disesuaikan dengan Spesifikasi Teknis yang digunakan peraturan-peraturan dan ketentuan-ketentuan yang berlaku, serta pertimbangan teknis terhadap

(Engineering Judgement

situasi dan kondisi lapangan setempat.

Terkait dengan hal tersebut, pemakai software ini harus benar-benar memahami keterbatasan software ini dan secara mandiri harus melakukan justifikasi teknik, serta bertanggung jawab penuh atas hasilnya.

Penyusun software maupun Pemrogram tidak bertanggung jawab atas segala akibat yang merugikan yang berkaitan dengan pemakaian software ini, serta terbebas dari segala tuntutan yang mungkin ada .

CATATAN : Sebelum menekan tombol SETUJU atau tombol TIDAK SETUJU , terleb

###

REKAPITULASI PERKIRAAN HARGA PEKERJAAN Proyek / Bagpro No. Paket Kontrak Nama Paket Prop / Kab / Kodya

No. Divisi

1 2 3 4 5 6 7 8 9 10

: : : :

Uraian

Umum Drainase Pekerjaan Tanah Pelebaran Perkerasan dan Bahu Jalan Pekerasan Non Aspal Perkerasan Aspal Struktur Pengembalian Kondisi dan Pekerjaan Minor Pekerjaan Harian Pekerjaan Pemeliharaan Rutin

Jumlah Harga Pekerjaan (Rupiah) 233,081,645 47,749,449 20,216,490 4,960,742 10,898,421 33,457,140 342,098,032 28,997,283 7,144,945 165,474

728,769,621 (A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) (B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 72,876,962 (C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 801,646,584 Terbilang : …………………………………………………………………………………….................................... ……………………………………………………………………………………....................................

..............., ................. 20... Disusun oleh Pejabat Pembuat Komitmen

( ............................. ) NIP

No. Mata Pembayaran

Perkiraan

Uraian

a 1.2

Satuan b

c

Kuantitas d

Mobilisasi

LS

1.8.(1)

Manajemen dan Keselamatan Lalu Lintas

LS

-

1.8.(2)

Jembatan Sementara

LS

1.0

1.17

1.0

Pengamanan Lingkungan Hidup

LS

-

1.20.(1)

Pengeboran, termasuk SPT dan Laporan

M1

24.0

1.20.(2)

Sondir termasuk Laporan

M1

24.0

Manajemen Mutu

LS

-

2.1.(1)

1.21

Galian untuk Selokan Drainase dan Saluran Air

M3

1.0

2.2.(1)

Pasangan Batu dengan Mortar

M3

1.0

2.3.(1)

Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm

M1

1.0

2.3.(2)

Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm

M1

1.0

2.3.(3)

Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm

M1

1.0

2.3.(4)

Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm

M1

1.0

2.3.(5)

Gorong2 Pipa Baja Bergelombang

Ton

1.0

2.3.(6)

Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm

M1

1.0

2.3.(7)

Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm

M1

1.0

2.3.(8)

Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm

M1

1.0

2.3.(9)

Saluran berbentuk U Tipe DS 1

M1

1.0

2.3.(10)

Saluran berbentuk U Tipe DS 2

M1

1.0

2.3.(11)

Saluran berbentuk U Tipe DS 3

M1

1.0

2.3.(12)

Beton K250 (fc’ 20) untuk struktur drainase beton minor

M3

1.0

2.3.(13)

Baja Tulangan untuk struktur drainase beton minor

Kg

1.0

2.3.(14)

Pasangan Batu tanpa Adukan (Aanstamping)

M3

1.0

2.4.(1)

Bahan Porous untuk Bahan Penyaring (Filter)

M3

1.0

2.4.(2)

Anyaman Filter Plastik

M2

1.0

2.4.(3)

Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan

M1

1.0

3.1.(1a)

Galian Biasa

M3

1.0

3.1.(1b)

Galian Batu Lunak

M3

1.0

3.1.(2)

Galian Batu

M3

1.0

3.1.(3)

Galian Struktur dengan kedalaman 0 - 2 meter

M3

1.0

3.1.(4)

Galian Struktur dengan kedalaman 2 - 4 meter

M3

1.0

3.1.(5)

Galian Struktur dengan kedalaman 4 - 6 meter

M3

1.0

3.1.(6)

Galian Perkerasan Beraspal dengan Cold Milling Machine

M3

1.0

3.1.(7)

Galian Perkerasan Beraspal tanpa Cold Milling Machine

M3

1.0

3.1.(8)

Galian Perkerasan berbutir

M3

1.0

3.1.(9).

Galian Perkerasan Beton

M3

1.0

3.2.(1a)

Timbunan Biasa dari sumber galian

M3

1.0

3.2.(2a)

Timbunan Pilihan dari sumber galian

M3

1.0

3.2.(3a)

Timbunan Pilihan (diukur diatas bak truk)

M3

1.0

3.3.(1)

Penyiapan Badan Jalan

M2

1.0

3.4.(1)

Pembersihan dan Pengupasan Lahan

M2

1.0

3.4.(2)

Pemotongan Pohon Pilihan diameter 15 – 30 cm

buah

1.0

3.4.(3)

Pemotongan Pohon Pilihan diameter 30 – 50 cm

buah

1.0

Pemotongan Pohon Pilihan diameter 50 – 75 cm

buah

1.0

Pemotongan Pohon Pilihan diameter > 75 cm

3.4.(4) 3.4.(5) 3.5.(1) 3.5.(2a) 3.5.(2b) 3.5.(2c) 3.5.(3)

buah

1.0

Geotekstil Filter untuk Drainage Bawah Permukaan (Kelas 2)

M2

1.0

Geotekstil Separator Kelas 1

M2

1.0

Geotekstil Separator Kelas 2

M2

1.0

Geotekstil Separator Kelas 3

M2

1.0

Geotekstil Stabilisator (Kelas 1)

M2

1.0

4.2.(1)

Lapis Pondasi Agregat Kelas A

M3

1.0

4.2.(2a)

Lapis Pondasi Agregat Kelas B

M3

1.0

4.2.(2b)

Lapis Pondasi Agregat Kelas S

M3

1.0

4.2.(3)

Semen untuk Lapis Pondasi Semen Tanah

Ton

1.0

4.2.(4)

Lapis Pondasi Semen Tanah

M3

1.0

4.2.(5)

Agregat Penutup BURTU

M2

1.0

4.2.(6)

Bahan Aspal untuk Pekerjaan Pelaburan

Liter

1.0

4.2.(7)

Lapis Resap Pengikat

Liter

1.0

4.2.(8)

Lapis Resap Perekat

Liter

1.0

4.2.(9)

Laston Lapis Antara (AC-BC)

Ton

1.0

4.2.(10)

Laston Lapis Antara Modifikasi (AC-BC Mod)

Ton

1.0

4.2.(11)

Laston Lapis Pondasi (AC-Base)

Ton

1.0

4.2.(12)

Laston Lapis Pondasi Modifikasi (AC-Base Mod)

Ton

1.0

4.2.(13)

Bahan anti pengelupasan

Kg

1.0

4.2.(14)

Perkerasan Beton Semen

M3

1.0

4.2.(15)

Perkerasan Beton Semen dengan anyaman Tulangan Tunggal

M3

1.0

4.2.(16)

Lapis Pondasi Bawah Beton Kurus

M3

1.0

5.1.(1)

Lapis Pondasi Agregat Kelas A

M3

1.0

5.1.(2)

Lapis Pondasi Agregat Kelas B

M3

1.0

5.2,(1)

Lapis Permukaan Agregat Tanpa Penutup Aspal

M3

1.0

5.2,(2)

Lapis Pondasi Agregat Tanpa Penutup Aspal

M3

1.0

5.3.(1)

Perkerasan Beton Semen

M3

1.0

5.3.(2)

Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal

M3

1.0

5.3.(3)

Lapis Pondasi bawah Beton Kurus

M3

1.0

5.4.(1)

Semen untuk Lapis Pondasi Semen Tanah

Ton

1.0

5.4.(2)

Lapis Pondasi Semen Tanah

M3

1.0

5.5.(1)

Lapis Pondasi Agregat Semen Kelas A (Cement Treated Base) (CTB)

M3

1.0

5.5.(2)

Lapis Pondasi Agregat Semen Kelas B (Cement Treated Sub Base) (CTSB)

M3

1.0

6.1 (1)(a)

Lapis Resap Pengikat - Aspal Cair

Liter

1.0

6.1 (1)(b)

Lapis Resap Pengikat - Aspal Emulsi

Liter

1.0

6.1 (2)(a)

Lapis Perekat - Aspal Cair

Liter

1.0

6.1 (2)(b)

Lapis Perekat - Aspal Emulsi

Liter

1.0

6.1 (2)(c)

Lapis Perekat - Aspal Emulsi Modifikasi

Liter

1.0

6.2 (1)

Agregat Penutup BURTU

M2

1.0

6.2 (2)

Agregat Penutup BURDA

M2

1.0

6.2 (3a)

Bahan Aspal untuk Pekerjaan Pelaburan

Liter

1.0

6.2 (3b)

Bahan Aspal Modifikasi untuk Pekerjaan Pelaburan

Liter

1.0

6.2 (4a)

Aspal Cair Emulsi untuk Precoated

Liter

1.0

6.2 (4b)

Aspal Emulsi untuk Precoated

Liter

1.0

6.2 (4c)

Aspal Emulsi Modifikasi untuk Precoated

Liter

1.0

6.2 (4d)

Bahan anti pengelupasan

Kg

1.0

6.3 (1)

Latasir Kelas A (SS-A)

Ton

1.0

6.3 (2)

Latasir Kelas B (SS-B)

Ton

1.0

6.3(3a)

Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang)

Ton

1.0

6.3(3b)

Lataston Lapis Aus Perata (HRS-WC(L)) (gradasi senjang/semi senjang)

Ton

1.0

6.3.(4a)

Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang)

Ton

1.0

6.3.(4b)

Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi senjang)

Ton

1.0

6.3(5a)

Laston Lapis Aus (AC-WC)

Ton

1.0

6.3(5b)

Laston Lapis Aus Modifikasi (AC-WC Mod)

Ton

1.0

6.3(5c)

Laston Lapis Aus Perata (AC-WC(L))

Ton

1.0

6.3(5d)

Laston Lapis Aus Modifikasi Perata (AC-WC(L)Mod)

Ton

1.0

6.3(6a)

Laston Lapis Antara (AC-BC)

Ton

1.0

6.3(6b)

Laston Lapis Antara Modifikasi (AC-BC Mod)

Ton

1.0

6.3(6c)

Laston Lapis Antara Perata (AC-BC(L)

Ton

1.0

6.3(6d)

Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) Leveling

Ton

1.0

6.3(7a)

Laston Lapis Pondasi (AC-Base)

Ton

1.0

6.3(7b)

Laston Lapis Pondasi Modifikasi (AC-Base Mod)

Ton

1.0

6.3(7c)

Laston Lapis Pondasi Perata (AC-Base(L))

Ton

1.0

6.3(7d)

Laston Lapis Pondasi Modifikasi Perata (AC-Base(L)Mod)

Ton

1.0

6.3.(8)

Bahan anti pengelupasan

Kg

1.0

6.5.(1)

Campuran Aspal Dingin untuk Pelapisan

M3

1.0

6.6.(1)

Lapis Permukaan Penetrasi Macadam

M3

1.0

6.6.(2)

Lapis Pondasi/Perata Penetrasi Macadam

M3

1.0

Err:509

Err:509

7.1 (2)

Beton mutu tinggi fc’45 Mpa

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7.1 (4)

Beton mutu tinggi fc’35 Mpa

M3

1.0

7.1 (5) a

Beton mutu sedang fc’30 MPa lantai jembatan

M3

1.0

Err:509

Err:509

7.1 (6)

Beton mutu sedang fc’25 Mpa

M3

7.1 (7) a

Beton mutu sedang fc’20 MPa

M3

Err:509

Err:509

7.1 (8)

Beton mutu rendah fc’15 MPa

M3

1.0

M3

Err:509

Err:509

Err:509 1.0

Err:509 1.0 1.0 Err:509

7.1 (9)

Beton Siklop fc’15 Mpa

M3

1.0

7.1 (10)

Beton mutu rendah fc’10 Mpa

M3

1.0

7.2 (1a)

Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter

Buah

1.0

7.2 (1b)

Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter

Buah

Err:509

Err:509

7.2 (2a)

Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter

Buah

1.0

7.2 (2b)

Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter

Buah

1.0

7.2 (2c)

Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang … meter

Buah

1.0

7.2 (3)a

Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter

Buah

Err:509

Err:509

7.2 (4)a

Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter

7.2 (4)b

Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7.2.(7)

Baja Prategang

7.2.(8)

Err:509

Err:509 Buah Buah

1.0 Err:509

1.0 Err:509 1.0 1.0

Kg

1.0

Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter

Buah

1.0

7.2.(9)

Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter

Buah

1.0

7.2.(10)

Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pengecoran (post tension)

m3

1.0

7.3 (1)

Baja Tulangan U 24 Polos

Kg

1.0

7.3 (2)

Baja Tulangan U 32 Polos

Kg

1.0

7.3 (3)

Baja Tulangan U 32 Ulir

Kg

1.0

7.3 (4)

Baja Tulangan U 39 Ulir

Kg

1.0

7.3 (5)

Baja Tulangan U 48 Ulir

Kg

1.0

7.3 (6)

Anyaman Kawat Yang Dilas (Welded Wire Mesh)

Kg

1.0

7.4 (1) a

Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa)

Kg

1.0

7.4 (1) b

Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa)

Kg

1.0

7.4 (1) c

Penyediaan Baja Struktur BJ …. (Titik Leleh ….. MPa)

Kg

1.0

7.4 (2) a

Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa)

Kg

1.0

7.4 (2) b

Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa)

Kg

1.0

7.4 (2) c

Pemasangan Baja Struktur BJ …. (Titik Leleh ….. MPa)

Kg

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7.5 (1)

Pemasangan jembatan Rangka Baja

7.5 (2) 7.6 (1)

1.0

Kg

1.0

Pengangkutan Bahan Jembatan

Kg

1.0

Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk

M1

1.0

7.6 (2)

Dinding Turap Kayu Tanpa Pengawetan

M2

1.0

7.6 (3)

Dinding Turap Kayu Dengan Pengawetan

M2

1.0

7.6 (4)

Dinding Turap Baja

M2

1.0

7.6 (5)

Dinding Turap Beton

M2

1.0

7.6 (6)

Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm

M1

1.0

7.6 (7)

Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm

M1

1.0

7.6 (8) a

Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 10 mm

M1

1.0

7.6 (8) b

Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal … mm

M1

1.0

7.6 (8) c

Penyediaan Tiang Pancang Baja Diameter ….. mm dengan tebal ... mm

Err:509

Err:509

Err:509

M1

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7.6 (13)

Pemancangan Tiang Pancang Kayu Ukuran …. mm

M1

1.0

7.6 (14) a

Pemancangan Tiang Pancang Baja Diameter 500 mm

M1

1.0

7.6 (14) b

Pemancangan Tiang Pancang Baja Diameter ..… mm

M1

1.0

1.0

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7.6 (19) a

Tiang Bor Beton, diameter 800 mm

M1

1.0

7.6 (19) b

Tiang Bor Beton, diameter ….. mm

M1

1.0

Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18) bila Tiang Pancang dikerjakan

M1

1.0

7.6 (20)

di Tempat Yang Berair. 7.6 (21)

Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) bila Tiang Bor Beton dikerjakan di Tempat Yang Berair.

0

-

M1

1.0

0

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7.9.(1)

Pasangan Batu

M3

1.0

7.10.(1)

Pasangan Batu Kosong yang Diisi Adukan

M3

1.0

7.10.(2)

Pasangan Batu Kosong

M3

1.0

Bronjong dengan kawat yang dilapisi galvanis

M3

7.10.(3) a.

1.0

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7.13.(1)

Sandaran (Railing)

M1

1.0

7.14.(1)

Papan Nama Jembatan

buah

1.0

7.15.(1)

Pembongkaran Pasangan Batu

M3

1.0

7.15.(2)

Pembongkaran Beton

M3

1.0

7.15.(3)

Pembongkaran Beton Pratekan

M3

1.0

7.15.(4)

Pembongkaran Bangunan Gedung

M2

1.0

7.15.(5)

Pembongkaran Rangka Baja

M2

1.0

7.15.(6)

Pembongkaran Balok Baja (Steel Stringers)

M'

1.0

7.15.(7)

Pembongkaran Lantai Jembatan Kayu

M2

1.0

7.15.(8)

Pembongkaran Jembatan Kayu

M2

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

0

0

8.1 (1)

Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor

8.1 (2)

Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor

8.1 (3)

Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor

8.1 (4)

1.0

0

-

M3

1.0

M3

1.0

M3 (vol. gembur)

1.0

Waterbound Macadam untuk Pekerjaan Minor

M3

1.0

8.1 (5)

Campuran Aspal Panas untuk Pekerjaan Minor

M3

1.0

8.1 (6)

Lasbutag atau Latasbusir untuk Pekerjaan Minor

M3

1.0

8.1 (7)

Penetrasi Macadam untuk Pekerjaan Minor

M3

1.0

8.1 (8)

Campuran Aspal Dingin untuk Pekerjaan Minor

M3

1.0

8.1 (9)

Residu Bitumen untuk Pekerjaan Minor

Liter

1.0

8.2.(1)

Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya

M3

1.0

8.3.(1a)

Stabilisasi dengan Tanaman

M2

1.0

8.3.(1b)

Stabilisasi dengan Tanaman VS

M2

1.0

8.3.(2)

Semak / Perdu………………….

M2

1.0

8.3.(3)

Pohon Jenis …………………….

Buah

1.0

8.4.(1)

Marka Jalan Termoplastik

M2

1.0

8.4.(2)

Marka Jalan Bukan Termoplastik

M2

1.0

8.4.(3a)

Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade

Buah

1.0

8.4.(3b)

Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade

Buah

1.0

8.4.(4a)

Rambu Jalan Tunggal dengan Pemantul High Intensity Grade

Buah

1.0

8.4.(4b)

Rambu Jalan Ganda dengan Pemantul High Intensity Grade

Buah

1.0

8.4.(5)

Patok Pengarah

Buah

1.0

8.4.(6a)

Patok Kilometer

Buah

1.0

8.4.(6b)

Patok Hektometer

Buah

1.0

8.4.(7)

Rel Pengaman

M1

1.0

8.4.(8)

Paku Jalan

Buah

1.0

8.4.(9)

Mata Kucing

Buah

1.0

8.4.(10a)

Kerb Pracetak Jenis 1 (Peninggi/Mountable)

M1

1.0

8.4.(10b)

Kerb Pracetak Jenis 2 (Penghalang/Barrier)

M1

1.0

8.4.(10c)

Kerb Pracetak Jenis 3 (Kerb Berparit/Gutter)

M1

1.0

8.4.(10d)

Kerb Pracetak Jenis 4 (Penghalang Berparit / Barrier Gutter) t = 20 cm

M1

1.0

8.4.(10e)

Kerb Pracetak Jenis 5 (Penghalang Berparit / Barrier Gutter) t = 30 cm

M1

1.0

8.4.(10f)

Kerb Pracetak Jenis 6 (Kerb dengan Bukaan)

Buah

1.0

8.4.(10g)

Kerb Pracetak Jenis 7a (Kerb pada Pelandaian Trotoar)

Buah

1.0

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

8.4.(11)

Kerb yang digunakan kembali

M1

8.4.(12)

Perkerasan Blok Beton pada Trotoar dan Median

M2

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

1.0 1.0

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

8.5(1)

Pengembalian Kondisi Lantai Jembatan Beton

M2

1.0

8.5(2)

Pengembalian Kondisi Lantai Jembatan Kayu

M2

1.0

8.5(3)

Pengembalian Kondisi Pelapisan Permukaan Baja Struktur

M2

1.0

9.1.(1)

Mandor

Jam

1.0

9.1.(2)

Pekerja Biasa

Jam

1.0

9.1.(3)

Tukang Kayu, Tukang Batu, dsb

Jam

1.0

9.1.(4) a

Dump Truck, kapasitas 3 - 4 m³

Jam

1.0

9.1.(4) b

Dump Truck, kapasitas 6 - 8 m³

Jam

1.0

9.1.(5) a

Truk Bak Datar 3 - 4 ton

Jam

1.0

9.1.(5) b

Truk Bak Datar 6 - 8 ton

Jam

1.0

9.1.(6)

Truk Tangki 3000 - 4500 Liter

Jam

1.0

9.1.(7)

Bulldozer 100 - 150 PK

Jam

1.0

9.1.(8)

Motor Grader min 100 PK

Jam

1.0

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Jam

1.0

9.1.(10)

Loader Roda Berantai 75 - 100 PK

Jam

1.0

9.1.(11)

Alat Penggali (Excavator) 80 - 140 PK

Jam

1.0

9.1.(12)

Crane 10 - 15 Ton

Jam

1.0

9.1.(13)

Penggilas Roda Besi 6 - 9 Ton

Jam

1.0

9.1.(14)

Penggilas Bervibrasi 5 - 8 Ton

Jam

1.0

9.1.(15)

Pemadat Bervibrasi 1.5 - 3.0 PK

Jam

1.0

9.1.(16)

Penggilas Roda Karet 8 - 10 Ton

Jam

1.0

9.1.(17)

Kompresor 4000 - 6500 Ltr/mnt

Jam

1.0

9.1.(18)

Mesin Pengaduk beton (Molen) 0.3 - 0.6 M3

Jam

1.0

9.1.(19)

Pompa Air 70 - 100 mm

Jam

1.0

9.1.(20)

Jack Hammer

Jam

1.0

10.1 (1)

Pemeliharaan Rutin Perkerasan

LS

1.0

0

Galian Biasa

M3

1.0

0

Patching/Penambalan Lubang

M2

1.0

0

Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor

M3

1.0

Pemeliharaan Rutin Bahu Jalan

LS

1.0

10.1 (2)

Harga

% Thd.

Satuan

Total Biaya

(Rupiah)

(%)

e

f

Jumlah Harga-Harga (Rupiah) g = (d x e)

37,750,000

5.1800

175,830,000

-

37,750,000 0

173,848,645

23.8551

173,848,645

40,080,000

-

0

609,583

2.0075

14,630,000

285,542

0.9404

6,853,000

231,600,000

-

0

86,285

0.0118

86,285

838,816

0.1151

838,816

776,482

0.1065

776,482

1,096,099

0.1504

1,096,099

2,284,885

0.3135

2,284,885

2,872,013

0.3941

2,872,013

34,799,371

4.7751

34,799,371

247,688

0.0340

247,688

279,120

0.0383

279,120

310,747

0.0426

310,747

439,207

0.0603

439,207

512,408

0.0703

512,408

614,889

0.0844

614,889

1,536,588

0.2108

1,536,588

18,307

0.0025

18,307

450,879

0.0619

450,879

442,123

0.0607

442,123

52,383

0.0072

52,383

91,159

0.0125

91,159

77,241

0.0106

77,241

181,822

0.0249

181,822

378,803

0.0520

378,803

18,230

0.0025

18,230

778,715

0.1069

778,715

782,731

0.1074

782,731

226,501

0.0311

226,501

986,230

0.1353

986,230

172,060

0.0236

172,060

202,496

0.0278

202,496

134,978

0.0185

134,978

221,951

0.0305

221,951

240,172

0.0330

240,172

8,592

0.0012

8,592

85,371

0.0117

85,371

13,971,561

1.9171

13,971,561

234,415

0.0322

234,415

332,303

0.0456

332,303

673,193

0.0924

673,193

6,585

0.0009

6,585

6,585

0.0009

6,585

6,585

0.0009

6,585

6,585

0.0009

6,585

6,585

0.0009

6,585

1,124,303

0.1543

1,124,303

1,021,364

0.1401

1,021,364

626,681

0.0860

626,681

1,907,674

0.2618

1,907,674

197,665

0.0271

197,665

50,674

0.0070

50,674

15,572

0.0021

15,572

16,809

0.0023

16,809

20,853

0.0029

20,853

1,752,056

0.2404

1,752,056

1,370,982

0.1881

1,370,982

1,408,881

0.1933

1,408,881

1,268,893

0.1741

1,268,893

57,750

0.0079

57,750

1,644,424

0.2256

1,644,424

2,196,976

0.3015

2,196,976

1,079,453

0.1481

1,079,453

1,230,912

0.1689

1,230,912

1,111,760

0.1526

1,111,760

520,235

0.0714

520,235

630,327

0.0865

630,327

1,644,424

0.2256

1,644,424

2,196,976

0.3015

2,196,976

1,079,453

0.1481

1,079,453

1,742,147

0.2391

1,742,147

170,615

0.0234

170,615

279,430

0.0383

279,430

292,143

0.0401

292,143

16,809

0.0023

16,809 ###

14,532

0.0020

14,532 ###

20,853

0.0029

20,853 ###

8,851

0.0012

8,851 ###

14,298

0.0020

14,298 ###

52,855

0.0073

52,855 ###

82,405

0.0113

82,405 ###

14,281

0.0020

14,281 ###

653

0.0001

653 ###

35,198

0.0048

35,198 ###

55,436

0.0076

55,436 ###

54,781

0.0075

54,781 ###

57,750

0.0079

57,750 ###

76,061

0.0104

76,061 ###

1,362,750

0.1870

1,362,750 ###

1,671,190

0.2293

1,671,190 ###

1,671,190

0.2293

1,671,190 ###

1,462,597

0.2007

1,462,597 ###

1,462,597

0.2007

1,462,597 ###

1,881,401

0.2582

1,881,401 ###

1,241,514

0.1704

1,241,514 ###

1,521,355

0.2088

1,521,355 ###

1,334,073

0.1831

1,334,073 ###

1,752,056

0.2404

1,752,056 ###

1,370,982

0.1881

1,370,982 ###

1,541,887

0.2116

1,541,887 ###

1,370,982

0.1881

1,370,982 ###

1,408,881

0.1933

1,408,881 ###

1,268,893

0.1741

1,268,893 ###

1,408,881

0.1933

1,408,881 ###

1,268,893

0.1741

1,268,893 ###

57,750

0.0079

57,750 ###

3,161,615

0.4338

3,161,615 ###

2,314,833

0.3176

2,314,833 ###

2,418,056

0.3318

2,418,056 ###

Err:509

Err:509

Err:509 ###

3,227,561

0.4429

3,227,561 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

3,062,973

0.4203

3,062,973 ###

2,985,801

0.4097

2,985,801 ###

Err:509

Err:509

Err:509 ###

2,530,210

0.3472

2,530,210 ###

2,366,957

0.3248

2,366,957 ###

Err:509

Err:509

Err:509 ###

2,327,195

0.3193

2,327,195 ###

1,352,262

0.1856

1,352,262 ###

1,307,441

0.1794

1,307,441 ###

17,250,000

2.3670

17,250,000 ###

23,000,000

3.1560

23,000,000 ###

Err:509

Err:509

Err:509 ###

46,316,973

6.3555

46,316,973 ###

74,253,290

10.1889

74,253,290 ###

81,436,552

11.1745

81,436,552 ###

17,250,000

2.3670

17,250,000 ###

Err:509

Err:509

Err:509 ###

1,341,446

0.1841

1,341,446 ###

1,341,446

0.1841

1,341,446 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

317,990

0.0436

317,990 ###

21,077,442

2.8922

21,077,442 ###

23,876,486

3.2763

23,876,486 ###

1,233,925

0.1693

1,233,925 ###

17,672

0.0024

17,672 ###

18,328

0.0025

18,328 ###

20,509

0.0028

20,509 ###

20,225

0.0028

20,225 ###

20,340

0.0028

20,340 ###

73,653

0.0101

73,653 ###

13,012

0.0018

13,012 ###

13,012

0.0018

13,012 ###

362

0.0000

362 ###

1,028

0.0001

1,028 ###

1,028

0.0001

1,028 ###

1,028

0.0001

1,028 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

1,162

0.0002

1,162 ###

637

0.0001

76,197

0.0105

76,197 ###

637Err:509

94,953

0.0130

94,953Err:509

93,388

0.0128

93,388Err:509

38,937

0.0053

38,937 ###

521,665

0.0716

521,665 ###

94,953

0.0130

85,976

0.0118

85,976 ###

200,263

0.0275

200,263 ###

200,263

0.0275

200,263Err:509

94,953Err:509

235,112

0.0323

235,112 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

233,469

0.0320

233,469 ###

77,823

0.0107

77,823

0.0107

77,823 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509Err:509

2,349,951

0.3225

2,349,951Err:509

3,662,662

0.5026

3,662,662Err:509

4,572

0.0006

4,572Err:509

-

-

0 ###

27,202

0.0037

27,202 ###

77,823Err:509

-

-

0 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

757,698

0.1040

757,698Err:509

921,702

0.1265

921,702Err:509

471,374

0.0647

471,374Err:509

659,692

0.0905

659,692 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

44,620

0.0061

44,620Err:509

368,000

0.0505

368,000Err:509

413,193

0.0567

413,193Err:509

689,235

0.0946

689,235 ###

340,881

0.0468

340,881 ###

125,567

0.0172

125,567 ###

443,548

0.0609

443,548Err:509

291,421

0.0400

291,421Err:509

138,711

0.0190

138,711Err:509

299,233

0.0411

299,233Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

-

-

946,492

0.1299

946,492Err:509

902,565

0.1238

902,565Err:509

647,936

0.0889

647,936Err:509

1,004,839

0.1379

1,004,839Err:509

3,682,390

0.5053

3,682,390Err:509

7,733,898

1.0612

7,733,898Err:509

2,326,881

0.3193

2,326,881Err:509

3,010,859

0.4131

3,010,859Err:509

15,325

0.0021

15,325Err:509

130,316

0.0179

130,316Err:509

46,805

0.0064

46,805 ###

14,970

0.0021

14,970 ###

46,230

0.0063

46,230 ###

42,780

0.0059

42,780 ###

394,762

0.0542

394,762Err:509

323,787

0.0444

323,787Err:509

436,360

0.0599

436,360Err:509

661,043

0.0907

661,043Err:509

487,593

0.0669

487,593Err:509

761,465

0.1045

761,465Err:509

190,179

0.0261

190,179Err:509

676,506

0.0928

676,506Err:509

302,430

0.0415

302,430Err:509

841,460

0.1155

841,460Err:509

219,891

0.0302

219,891Err:509

296,263

0.0407

296,263Err:509

166,967

0.0229

166,967Err:509

187,502

0.0257

187,502Err:509

196,136

0.0269

196,136Err:509

230,770

0.0317

230,770Err:509

275,934

0.0379

275,934 ###

91,027

0.0125

91,027 ###

874,808

0.1200

874,808 ###

Err:509

Err:509

Err:509 ### Err:509 ###

0 ###

Err:509

Err:509

76,902

0.0106

76,902 ###

116,190

0.0159

116,190 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509Err:509

Err:509

Err:509

Err:509 ###

Err:509

Err:509

Err:509 ###

144,490

0.0198

144,490 ###

406,329

0.0558

406,329 ###

86,201

0.0118

86,201 ###

19,714

0.0027

19,714 ###

16,429

0.0023

16,429 ###

20,536

0.0028

20,536 ###

331,054

0.0454

331,054 ###

-

-

0 ###

526,186

0.0722

526,186 ###

-

-

0 ###

280,383

0.0385

280,383 ###

818,855

0.1124

818,855 ###

758,785

0.1041

758,785 ###

614,032

0.0843

614,032 ###

331,563

0.0455

331,563 ###

647,671

0.0889

647,671 ###

718,769

0.0986

718,769 ###

526,307

0.0722

526,307 ###

465,651

0.0639

465,651 ###

67,390

0.0092

67,390 ###

488,006

0.0670

488,006 ###

198,514

0.0272

198,514 ###

201,515

0.0277

201,515 ###

59,311

0.0081

59,311 ###

54,273

0.0074

54,273 ###

63,877,709

8.7651

63,877,709 ###

77,241

0.0106

77,241Err:509

273,795

0.0376

273,795Err:509

902,565

0.1238

902,565 ###

55,912,661

7.6722

55,912,661 ###

% Thd.

No. Mata

Total

Pembayaran

Perkiraan

Uraian

Satuan

Kuantitas

Biaya a 5.1800 0.0000 23.8551 0.0000 2.0075 0.9404 0.0000 0.0118 0.1151 0.1065 0.1504 0.3135 0.3941 4.7751 0.0340 0.0383 0.0426 0.0603 0.0703 0.0844 0.2108 0.0025 0.0619 0.0607 0.0072 0.0125 0.0106 0.0249 0.0520 0.0025 0.1069 0.1074 0.0311 0.1353 0.0236 0.0278 0.0185 0.0305 0.0330 0.0012 0.0117 1.9171 0.0322 0.0456 0.0924 0.0009 0.0009 0.0009 0.0009 0.0009 0.1543 0.1401 0.0860

c

### 1.8.(1) ### 1.8.(2) ### 1.17 ### 1.20.(1) ### 1.20.(2) ### 1.21 ### 2.1.(1) ### 2.2.(1) ### 2.3.(1) ### 2.3.(2) ### 2.3.(3) ### 2.3.(4) ### 2.3.(5) ### 2.3.(6) ### 2.3.(7) ### 2.3.(8) ### 2.3.(9) ### 2.3.(10) ### 2.3.(11) ### 2.3.(12) ### 2.3.(13) ### 2.3.(14) ### 2.4.(1) ### 2.4.(2) ### 2.4.(3) ### 3.1.(1a) ### 3.1.(1b) ### 3.1.(2) ### 3.1.(3) ### 3.1.(4) ### 3.1.(5) ### 3.1.(6) ### 3.1.(7) ### 3.1.(8) ### 3.1.(9). ### 3.2.(1a) ### 3.2.(2a) ### 3.2.(3a) ### 3.3.(1) ### 3.4.(1) ### 3.4.(2) ### 3.4.(3) ### 3.4.(4) ### 3.4.(5) ### 3.5.(1) ### 3.5.(2a) ### 3.5.(2b) ### 3.5.(2c) ### 3.5.(3) ### 4.2.(1) ### 4.2.(2a) ### 4.2.(2b) ### 1.2

d

e

f

Mobilisasi

LS

1.0

Manajemen dan Keselamatan Lalu Lintas

LS

-

Jembatan Sementara

LS

1.0

Pengamanan Lingkungan Hidup

LS

-

Pengeboran, termasuk SPT dan Laporan

M1

24.0

Sondir termasuk Laporan

M1

24.0

Manajemen Mutu

LS

-

Galian untuk Selokan Drainase dan Saluran Air

M3

1.0

Pasangan Batu dengan Mortar

M3

1.0

Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm

M1

1.0

Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm

M1

1.0

Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm

M1

1.0

Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm

M1

1.0

Gorong2 Pipa Baja Bergelombang

Ton

1.0

Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm

M1

1.0

Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm

M1

1.0

Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm

M1

1.0

Saluran berbentuk U Tipe DS 1

M1

1.0

Saluran berbentuk U Tipe DS 2

M1

1.0

Saluran berbentuk U Tipe DS 3

M1

1.0

Beton K250 (fc’ 20) untuk struktur drainase beton minor

M3

1.0

Baja Tulangan untuk struktur drainase beton minor

Kg

1.0

Pasangan Batu tanpa Adukan (Aanstamping)

M3

1.0

Bahan Porous untuk Bahan Penyaring (Filter)

M3

1.0

Anyaman Filter Plastik

M2

1.0

Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Ba

M1

1.0

Galian Biasa

M3

1.0

Galian Batu Lunak

M3

1.0

Galian Batu

M3

1.0

Galian Struktur dengan kedalaman 0 - 2 meter

M3

1.0

Galian Struktur dengan kedalaman 2 - 4 meter

M3

1.0

Galian Struktur dengan kedalaman 4 - 6 meter

M3

1.0

Galian Perkerasan Beraspal dengan Cold Milling Machine

M3

1.0

Galian Perkerasan Beraspal tanpa Cold Milling Machine

M3

1.0

Galian Perkerasan berbutir

M3

1.0

Galian Perkerasan Beton

M3

1.0

Timbunan Biasa dari sumber galian

M3

1.0

Timbunan Pilihan dari sumber galian

M3

1.0

Timbunan Pilihan (diukur diatas bak truk)

M3

1.0

Penyiapan Badan Jalan

M2

1.0

Pembersihan dan Pengupasan Lahan

M2

1.0

Pemotongan Pohon Pilihan diameter 15 – 30 cm

buah

1.0

Pemotongan Pohon Pilihan diameter 30 – 50 cm

buah

1.0

Pemotongan Pohon Pilihan diameter 50 – 75 cm

buah

1.0

Pemotongan Pohon Pilihan diameter > 75 cm

buah

1.0

Geotekstil Filter untuk Drainage Bawah Permukaan (Kelas 2)

M2

1.0

Geotekstil Separator Kelas 1

M2

1.0

Geotekstil Separator Kelas 2

M2

1.0

Geotekstil Separator Kelas 3

M2

1.0

Geotekstil Stabilisator (Kelas 1)

M2

1.0

Lapis Pondasi Agregat Kelas A

M3

1.0

Lapis Pondasi Agregat Kelas B

M3

1.0

Lapis Pondasi Agregat Kelas S

M3

1.0

0.2618 0.0271 0.0070 0.0021 0.0023 0.0029 0.2404 0.1881 0.1933 0.1741 0.0079 0.2256 0.3015 0.1481 0.1689 0.1526 0.0714 0.0865 0.2256 0.3015 0.1481 0.2391 0.0234 0.0383 0.0401 0.0023 0.0020 0.0029 0.0012 0.0020 0.0073 0.0113 0.0020 0.0001 0.0048 0.0076 0.0075 0.0079 0.0104 0.1870 0.2293 0.2293 0.2007 0.2007 0.2582 0.1704 0.2088 0.1831 0.2404 0.1881 0.2116 0.1881 0.1933 0.1741 0.1933 0.1741 0.0079 0.4338 0.3176 0.3318

### 4.2.(4) ### 4.2.(5) ### 4.2.(6) ### 4.2.(7) ### 4.2.(8) ### 4.2.(9) ### 4.2.(10) ### 4.2.(11) ### 4.2.(12) ### 4.2.(13) ### 4.2.(14) ### 4.2.(15) ### 4.2.(16) ### 5.1.(1) ### 5.1.(2) ### 5.2,(1) ### 5.2,(2) ### 5.3.(1) ### 5.3.(2) ### 5.3.(3) ### 5.4.(1) ### 5.4.(2) ### 5.5.(1) ### 5.5.(2) ### 6.1 (1)(a)### 6.1 (1)(b)### 6.1 (2)(a)### 6.1 (2)(b)### 6.1 (2)(c)### 6.2 (1) ### 6.2 (2) ### 6.2 (3a) ### 6.2 (3b) ### 6.2 (4a) ### 6.2 (4b) ### 6.2 (4c) ### 6.2 (4d) ### 6.3 (1) ### 6.3 (2) ### 6.3(3a) ### 6.3(3b) ### 6.3.(4a) ### 6.3.(4b) ### 6.3(5a) ### 6.3(5b) ### 6.3(5c) ### 6.3(5d) ### 6.3(6a) ### 6.3(6b) ### 6.3(6c) ### 6.3(6d) ### 6.3(7a) ### 6.3(7b) ### 6.3(7c) ### 6.3(7d) ### 6.3.(8) ### 6.5.(1) ### 6.6.(1) ### 6.6.(2) ### 4.2.(3)

Semen untuk Lapis Pondasi Semen Tanah

Ton

1.0

Lapis Pondasi Semen Tanah

M3

1.0

Agregat Penutup BURTU

M2

1.0

Bahan Aspal untuk Pekerjaan Pelaburan

Liter

1.0

Lapis Resap Pengikat

Liter

1.0

Lapis Resap Perekat

Liter

1.0

Laston Lapis Antara (AC-BC)

Ton

1.0

Laston Lapis Antara Modifikasi (AC-BC Mod)

Ton

1.0

Laston Lapis Pondasi (AC-Base)

Ton

1.0

Laston Lapis Pondasi Modifikasi (AC-Base Mod)

Ton

1.0

Bahan anti pengelupasan

Kg

1.0

Perkerasan Beton Semen

M3

1.0

Perkerasan Beton Semen dengan anyaman Tulangan Tunggal

M3

1.0

Lapis Pondasi Bawah Beton Kurus

M3

1.0

Lapis Pondasi Agregat Kelas A

M3

1.0

Lapis Pondasi Agregat Kelas B

M3

1.0

Lapis Permukaan Agregat Tanpa Penutup Aspal

M3

1.0

Lapis Pondasi Agregat Tanpa Penutup Aspal

M3

1.0

Perkerasan Beton Semen

M3

1.0

Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal

M3

1.0

Lapis Pondasi bawah Beton Kurus

M3

1.0

Semen untuk Lapis Pondasi Semen Tanah

Ton

1.0

Lapis Pondasi Semen Tanah

M3

1.0

Lapis Pondasi Agregat Semen Kelas A (Cement Treated Base) (CTB)

M3

1.0

Lapis Pondasi Agregat Semen Kelas B (Cement Treated Sub Base) (CTS

M3

1.0

Lapis Resap Pengikat - Aspal Cair

Liter

1.0

Lapis Resap Pengikat - Aspal Emulsi

Liter

1.0

Lapis Perekat - Aspal Cair

Liter

1.0

Lapis Perekat - Aspal Emulsi

Liter

1.0

Lapis Perekat - Aspal Emulsi Modifikasi

Liter

1.0

Agregat Penutup BURTU

M2

1.0

Agregat Penutup BURDA

M2

1.0

Bahan Aspal untuk Pekerjaan Pelaburan

Liter

1.0

Bahan Aspal Modifikasi untuk Pekerjaan Pelaburan

Liter

1.0

Aspal Cair Emulsi untuk Precoated

Liter

1.0

Aspal Emulsi untuk Precoated

Liter

1.0

Aspal Emulsi Modifikasi untuk Precoated

Liter

1.0

Bahan anti pengelupasan

Kg

1.0

Latasir Kelas A (SS-A)

Ton

1.0

Latasir Kelas B (SS-B)

Ton

1.0

Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang)

Ton

1.0

Lataston Lapis Aus Perata (HRS-WC(L)) (gradasi senjang/semi senjang)

Ton

1.0

Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang)

Ton

1.0

Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi sen

Ton

1.0

Laston Lapis Aus (AC-WC)

Ton

1.0

Laston Lapis Aus Modifikasi (AC-WC Mod)

Ton

1.0

Laston Lapis Aus Perata (AC-WC(L))

Ton

1.0

Laston Lapis Aus Modifikasi Perata (AC-WC(L)Mod)

Ton

1.0

Laston Lapis Antara (AC-BC)

Ton

1.0

Laston Lapis Antara Modifikasi (AC-BC Mod)

Ton

1.0

Laston Lapis Antara Perata (AC-BC(L)

Ton

1.0

Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) Leveling

Ton

1.0

Laston Lapis Pondasi (AC-Base)

Ton

1.0

Laston Lapis Pondasi Modifikasi (AC-Base Mod)

Ton

1.0

Laston Lapis Pondasi Perata (AC-Base(L))

Ton

1.0

Laston Lapis Pondasi Modifikasi Perata (AC-Base(L)Mod)

Ton

1.0

Bahan anti pengelupasan

Kg

1.0

Campuran Aspal Dingin untuk Pelapisan

M3

1.0

Lapis Permukaan Penetrasi Macadam

M3

1.0

Lapis Pondasi/Perata Penetrasi Macadam

M3

1.0

Err:509 0.4429 Err:509 Err:509 0.4203 0.4097 Err:509 0.3472 0.3248 Err:509 0.3193 0.1856 0.1794 2.3670 3.1560 Err:509 6.3555 10.1889 11.1745 2.3670 Err:509 0.1841 0.1841 Err:509 Err:509 0.0436 2.8922 3.2763 0.1693 0.0024 0.0025 0.0028 0.0028 0.0028 0.0101 0.0018 0.0018 0.0000 0.0001 0.0001 0.0001 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.0002 0.0001 0.0105 0.0130 0.0128 0.0053 0.0716 0.0130 0.0118 0.0275 0.0275

### Err:509 7.1 (2) ### Beton mutu tinggi fc’45 Mpa Err:509 ### Err:509 Err:509 ### Err:509 7.1 (4) ### Beton mutu tinggi fc’35 Mpa 7.1 (5) a ### Beton mutu sedang fc’30 MPa lantai jembatan Err:509 ### Err:509 7.1 (6) ### Beton mutu sedang fc’25 Mpa 7.1 (7) a ### Beton mutu sedang fc’20 MPa Err:509 ### Err:509 7.1 (8) ### Beton mutu rendah fc’15 MPa 7.1 (9) ### Beton Siklop fc’15 Mpa 7.1 (10) ### Beton mutu rendah fc’10 Mpa 7.2 (1a) ### Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter 7.2 (1b) ### Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Err:509 ### Err:509 7.2 (2a) ### Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter 7.2 (2b) ### Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter 7.2 (2c) ### Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang … meter 7.2 (3)a ### Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Err:509 ### Err:509 7.2 (4)a ### Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter 7.2 (4)b ### Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Err:509 ### Err:509 Err:509 ### Err:509 7.2.(7) ### Baja Prategang 7.2.(8) ### Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter 7.2.(9) ### Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter 7.2.(10) ### Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pen 7.3 (1) ### Baja Tulangan U 24 Polos 7.3 (2) ### Baja Tulangan U 32 Polos 7.3 (3) ### Baja Tulangan U 32 Ulir 7.3 (4) ### Baja Tulangan U 39 Ulir 7.3 (5) ### Baja Tulangan U 48 Ulir 7.3 (6) ### Anyaman Kawat Yang Dilas (Welded Wire Mesh) 7.4 (1) a ### Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa) 7.4 (1) b ### Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa) 7.4 (1) c ### Penyediaan Baja Struktur BJ …. (Titik Leleh ….. MPa) 7.4 (2) a ### Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa) 7.4 (2) b ### Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa) 7.4 (2) c ### Pemasangan Baja Struktur BJ …. (Titik Leleh ….. MPa) Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 7.5 (1) ### Pemasangan jembatan Rangka Baja 7.5 (2) ### Pengangkutan Bahan Jembatan 7.6 (1) ### Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk 7.6 (2) ### Dinding Turap Kayu Tanpa Pengawetan 7.6 (3) ### Dinding Turap Kayu Dengan Pengawetan 7.6 (4) ### Dinding Turap Baja 7.6 (5) ### Dinding Turap Beton 7.6 (6) ### Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm 7.6 (7) ### Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm 7.6 (8) a ### Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 10 mm 7.6 (8) b ### Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal … mm Err:509

Err:509 M3

Err:509 1.0

Err:509

Err:509

Err:509

Err:509

M3

1.0

M3

1.0

Err:509 M3 M3 Err:509

Err:509 1.0 1.0 Err:509

M3

1.0

M3

1.0

M3

1.0

Buah

1.0

Buah Err:509

1.0 Err:509

Buah

1.0

Buah

1.0

Buah

1.0

Buah Err:509 Buah Buah

1.0 Err:509 1.0 1.0

Err:509

Err:509

Err:509

Err:509

Kg

1.0

Buah

1.0

Buah

1.0

m3

1.0

Kg

1.0

Kg

1.0

Kg

1.0

Kg

1.0

Kg

1.0

Kg

1.0

Kg

1.0

Kg

1.0

Kg

1.0

Kg

1.0

Kg

1.0

Kg

1.0

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Kg

1.0

Kg

1.0

M1

1.0

M2

1.0

M2

1.0

M2

1.0

M2

1.0

M1

1.0

M1

1.0

M1

1.0

M1

1.0

0.0323 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.0320 0.0107 0.0107 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.3225 0.5026 0.0006 0.0000 0.0037 0.0000 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.1040 0.1265 0.0647 0.0905 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.0061

7.6 (8) c ### Penyediaan Tiang Pancang Baja Diameter ….. mm dengan tebal ... mm

### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 7.6 (13) ### Pemancangan Tiang Pancang Kayu Ukuran …. mm 7.6 (14) a### Pemancangan Tiang Pancang Baja Diameter 500 mm 7.6 (14) b### Pemancangan Tiang Pancang Baja Diameter ..… mm Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 7.6 (19) a### Tiang Bor Beton, diameter 800 mm 7.6 (19) b### Tiang Bor Beton, diameter ….. mm 7.6 (20) ### Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18) bila ### di Tempat Yang Berair. 0 7.6 (21) ### Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) bila Tiang Bor B ### di Tempat Yang Berair. 0 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 ### Err:509 0 Err:509 ### Err:509 ### Err:509 0 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 7.9.(1) ### Pasangan Batu 7.10.(1) ### Pasangan Batu Kosong yang Diisi Adukan 7.10.(2) ### Pasangan Batu Kosong 7.10.(3) a.### Bronjong dengan kawat yang dilapisi galvanis Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 7.13.(1) ### Sandaran (Railing) Err:509

M1

1.0

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

M1

1.0

M1

1.0

M1

1.0

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

M1

1.0

M1

1.0

M1

1.0 -

M1

1.0

-

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

M3

1.0

M3

1.0

M3

1.0

M3

1.0

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

M1

1.0

0.0505

7.14.(1) ### Papan Nama Jembatan

buah

1.0

0.0567

7.15.(1) ### Pembongkaran Pasangan Batu

M3

1.0

0.0946

7.15.(2) ### Pembongkaran Beton

M3

1.0

0.0468

7.15.(3) ### Pembongkaran Beton Pratekan

M3

1.0

0.0172

7.15.(4) ### Pembongkaran Bangunan Gedung

M2

1.0

0.0609

7.15.(5) ### Pembongkaran Rangka Baja

M2

1.0

0.0400

7.15.(6) ### Pembongkaran Balok Baja (Steel Stringers)

M'

1.0

0.0190

7.15.(7) ### Pembongkaran Lantai Jembatan Kayu

M2

1.0

0.0411

7.15.(8) ### Pembongkaran Jembatan Kayu

M2

Err:509

### Err:509 Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 ### Err:509 Err:509 Err:509 ### Err:509 Err:509 Err:509 ### Err:509 Err:509 ### 0 8.1 (1) ### Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor M3 8.1 (2) ### Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor M3 8.1 (3) ### Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan MinorM3 (vol. gembur) 8.1 (4) ### Waterbound Macadam untuk Pekerjaan Minor M3 8.1 (5) ### Campuran Aspal Panas untuk Pekerjaan Minor M3 8.1 (6) ### Lasbutag atau Latasbusir untuk Pekerjaan Minor M3 ### 8.1 (7) Penetrasi Macadam untuk Pekerjaan Minor M3 8.1 (8) ### Campuran Aspal Dingin untuk Pekerjaan Minor M3 8.1 (9) ### Residu Bitumen untuk Pekerjaan Minor Liter 8.2.(1) ### Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya M3 8.3.(1a) ### Stabilisasi dengan Tanaman M2 8.3.(1b) ### Stabilisasi dengan Tanaman VS M2 8.3.(2) ### Semak / Perdu…………………. M2 8.3.(3) ### Pohon Jenis ……………………. Buah 8.4.(1) ### Marka Jalan Termoplastik M2 8.4.(2) ### Marka Jalan Bukan Termoplastik M2 8.4.(3a) ### Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah 8.4.(3b) ### Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade Buah 8.4.(4a) ### Rambu Jalan Tunggal dengan Pemantul High Intensity Grade Buah 8.4.(4b) ### Rambu Jalan Ganda dengan Pemantul High Intensity Grade Buah 8.4.(5) ### Patok Pengarah Buah 8.4.(6a) ### Patok Kilometer Buah 8.4.(6b) ### Patok Hektometer Buah 8.4.(7) ### Rel Pengaman M1 8.4.(8) ### Paku Jalan Buah 8.4.(9) ### Mata Kucing Buah 8.4.(10a)### Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 8.4.(10b)### Kerb Pracetak Jenis 2 (Penghalang/Barrier) M1 ### 8.4.(10c) Kerb Pracetak Jenis 3 (Kerb Berparit/Gutter) M1 8.4.(10d)### Kerb Pracetak Jenis 4 (Penghalang Berparit / Barrier Gutter) t = 20 cm M1 8.4.(10e)### Kerb Pracetak Jenis 5 (Penghalang Berparit / Barrier Gutter) t = 30 cm M1 8.4.(10f) ### Kerb Pracetak Jenis 6 (Kerb dengan Bukaan) Buah 8.4.(10g)### Kerb Pracetak Jenis 7a (Kerb pada Pelandaian Trotoar) Buah Err:509 ### Err:509 Err:509 Err:509 ### Err:509 Err:509 8.4.(11) ### Kerb yang digunakan kembali M1 8.4.(12) ### Perkerasan Blok Beton pada Trotoar dan Median M2 Err:509 ### Err:509 Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 ### Err:509 Err:509 Err:509 ### Err:509 Err:509 Err:509 ### Err:509 Err:509 Err:509 ### Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 0.0000 0.1299 0.1238 0.0889 0.1379 0.5053 1.0612 0.3193 0.4131 0.0021 0.0179 0.0064 0.0021 0.0063 0.0059 0.0542 0.0444 0.0599 0.0907 0.0669 0.1045 0.0261 0.0928 0.0415 0.1155 0.0302 0.0407 0.0229 0.0257 0.0269 0.0317 0.0379 0.0125 0.1200 Err:509 Err:509 0.0106 0.0159 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

1.0 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Err:509 Err:509 1.0 1.0 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 0.0198 0.0558 0.0118 0.0027 0.0023 0.0028 0.0454 0.0000 0.0722 0.0000 0.0385 0.1124 0.1041 0.0843 0.0455 0.0889 0.0986 0.0722 0.0639 0.0092 0.0670 0.0272 0.0277 0.0081 0.0074 8.7651 0.0106 0.0376 0.1238 7.6722

Err:509

### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 Err:509 ### Err:509 8.5(1) ### Pengembalian Kondisi Lantai Jembatan Beton 8.5(2) ### Pengembalian Kondisi Lantai Jembatan Kayu 8.5(3) ### Pengembalian Kondisi Pelapisan Permukaan Baja Struktur 9.1.(1) ### Mandor 9.1.(2) ### Pekerja Biasa 9.1.(3) ### Tukang Kayu, Tukang Batu, dsb 9.1.(4) a ### Dump Truck, kapasitas 3 - 4 m³ 9.1.(4) b ### Dump Truck, kapasitas 6 - 8 m³ 9.1.(5) a ### Truk Bak Datar 3 - 4 ton 9.1.(5) b ### Truk Bak Datar 6 - 8 ton 9.1.(6) ### Truk Tangki 3000 - 4500 Liter 9.1.(7) ### Bulldozer 100 - 150 PK 9.1.(8) ### Motor Grader min 100 PK 9.1.(9) ### Loader Roda Karet 1.0 - 1.6 M3 9.1.(10) ### Loader Roda Berantai 75 - 100 PK 9.1.(11) ### Alat Penggali (Excavator) 80 - 140 PK 9.1.(12) ### Crane 10 - 15 Ton 9.1.(13) ### Penggilas Roda Besi 6 - 9 Ton 9.1.(14) ### Penggilas Bervibrasi 5 - 8 Ton 9.1.(15) ### Pemadat Bervibrasi 1.5 - 3.0 PK 9.1.(16) ### Penggilas Roda Karet 8 - 10 Ton 9.1.(17) ### Kompresor 4000 - 6500 Ltr/mnt 9.1.(18) ### Mesin Pengaduk beton (Molen) 0.3 - 0.6 M3 9.1.(19) ### Pompa Air 70 - 100 mm 9.1.(20) ### Jack Hammer 10.1 (1) ### Pemeliharaan Rutin Perkerasan ### Galian Biasa 0 ### Patching/Penambalan Lubang 0 ### Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor 0 10.1 (2) ### Pemeliharaan Rutin Bahu Jalan Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

M2

1.0

M2

1.0

M2

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

Jam

1.0

LS

1.0

M3

1.0

M2

1.0

M3

1.0

LS

1.0

Cumm

Jumlah Harga-Harga (Rupiah) h

Harga Satuan (Rupiah) g 37,750,000

% for Major Items i

37,750,000

175,830,000

0

Err:509

173,848,645

173,848,645

Err:509

40,080,000

0

Err:509

609,583

14,630,000

Err:509

285,542

6,853,000

Err:509

231,600,000

0

Err:509

86,285

86,285

Err:509

838,816

838,816

Err:509

776,482

776,482

Err:509

1,096,099

1,096,099

Err:509

2,284,885

2,284,885

Err:509

2,872,013

2,872,013

Err:509

34,799,371

34,799,371

Err:509

247,688

247,688

Err:509

279,120

279,120

Err:509

310,747

310,747

Err:509

439,207

439,207

Err:509

512,408

512,408

Err:509

614,889

614,889

Err:509

1,536,588

1,536,588

Err:509

18,307

18,307

Err:509

450,879

450,879

Err:509

442,123

442,123

Err:509

52,383

52,383

Err:509

91,159

91,159

Err:509

77,241

77,241

Err:509

181,822

181,822

Err:509

378,803

378,803

Err:509

18,230

18,230

Err:509

778,715

778,715

Err:509

782,731

782,731

Err:509

226,501

226,501

Err:509

986,230

986,230

Err:509

172,060

172,060

Err:509

202,496

202,496

Err:509

134,978

134,978

Err:509

221,951

221,951

Err:509

240,172

240,172

Err:509

8,592

8,592

Err:509

85,371

85,371

Err:509

13,971,561

13,971,561

Err:509

234,415

234,415

Err:509

332,303

332,303

Err:509

673,193

673,193

Err:509

6,585

6,585

Err:509

6,585

6,585

Err:509

6,585

6,585

Err:509

6,585

6,585

Err:509

6,585

6,585

Err:509

1,124,303

1,124,303

Err:509

1,021,364

1,021,364

Err:509

626,681

626,681

Err:509

1,907,674

1,907,674

Err:509

197,665

197,665

Err:509

50,674

50,674

Err:509

15,572

15,572

Err:509

16,809

16,809

Err:509

20,853

20,853

Err:509

1,752,056

1,752,056

Err:509

1,370,982

1,370,982

Err:509

1,408,881

1,408,881

Err:509

1,268,893

1,268,893

Err:509

57,750

57,750

Err:509

1,644,424

1,644,424

Err:509

2,196,976

2,196,976

Err:509

1,079,453

1,079,453

Err:509

1,230,912

1,230,912

Err:509

1,111,760

1,111,760

Err:509

520,235

520,235

Err:509

630,327

630,327

Err:509

1,644,424

1,644,424

Err:509

2,196,976

2,196,976

Err:509

1,079,453

1,079,453

Err:509

1,742,147

1,742,147

Err:509

170,615

170,615

Err:509

279,430

279,430

Err:509

292,143

292,143

Err:509

16,809

16,809

Err:509

14,532

14,532

Err:509

20,853

20,853

Err:509

8,851

8,851

Err:509

14,298

14,298

Err:509

52,855

52,855

Err:509

82,405

82,405

Err:509

14,281

14,281

Err:509

653

653

Err:509

35,198

35,198

Err:509

55,436

55,436

Err:509

54,781

54,781

Err:509

57,750

57,750

Err:509

76,061

76,061

Err:509

1,362,750

1,362,750

Err:509

1,671,190

1,671,190

Err:509

1,671,190

1,671,190

Err:509

1,462,597

1,462,597

Err:509

1,462,597

1,462,597

Err:509

1,881,401

1,881,401

Err:509

1,241,514

1,241,514

Err:509

1,521,355

1,521,355

Err:509

1,334,073

1,334,073

Err:509

1,752,056

1,752,056

Err:509

1,370,982

1,370,982

Err:509

1,541,887

1,541,887

Err:509

1,370,982

1,370,982

Err:509

1,408,881

1,408,881

Err:509

1,268,893

1,268,893

Err:509

1,408,881

1,408,881

Err:509

1,268,893

1,268,893

Err:509

57,750

57,750

Err:509

3,161,615

3,161,615

Err:509

2,314,833

2,314,833

Err:509

2,418,056

2,418,056

Err:509

Err:509

Err:509

Err:509

3,227,561

3,227,561

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

3,062,973

3,062,973

Err:509

2,985,801

2,985,801

Err:509

Err:509

Err:509

Err:509

2,530,210

2,530,210

Err:509

2,366,957

2,366,957

Err:509

Err:509

Err:509

Err:509

2,327,195

2,327,195

Err:509

1,352,262

1,352,262

Err:509

1,307,441

1,307,441

Err:509

17,250,000

17,250,000

Err:509

23,000,000

23,000,000

Err:509

Err:509

Err:509

Err:509

46,316,973

46,316,973

Err:509

74,253,290

74,253,290

Err:509

81,436,552

81,436,552

Err:509

17,250,000

17,250,000

Err:509

Err:509

Err:509

Err:509

1,341,446

1,341,446

Err:509

1,341,446

1,341,446

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

317,990

317,990

Err:509

21,077,442

21,077,442

Err:509

23,876,486

23,876,486

Err:509

1,233,925

1,233,925

Err:509

17,672

17,672

Err:509

18,328

18,328

Err:509

20,509

20,509

Err:509

20,225

20,225

Err:509

20,340

20,340

Err:509

73,653

73,653

Err:509

13,012

13,012

Err:509

13,012

13,012

Err:509

362

362

Err:509

1,028

1,028

Err:509

1,028

1,028

Err:509

1,028

1,028

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

1,162

1,162

Err:509

637

637

Err:509

76,197

76,197

Err:509

94,953

94,953

Err:509

93,388

93,388

Err:509

38,937

38,937

Err:509

521,665

521,665

Err:509

94,953

94,953

Err:509

85,976

85,976

Err:509

200,263

200,263

Err:509

200,263

200,263

Err:509

235,112

235,112

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

233,469

233,469

Err:509

77,823

77,823

Err:509

77,823

77,823

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

2,349,951

2,349,951

Err:509

3,662,662

3,662,662

Err:509

4,572

4,572

Err:509

-

0

Err:509

27,202

27,202

Err:509

-

0

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

757,698

757,698

Err:509

921,702

921,702

Err:509

471,374

471,374

Err:509

659,692

659,692

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

44,620

44,620

Err:509

368,000

368,000

Err:509

413,193

413,193

Err:509

689,235

689,235

Err:509

340,881

340,881

Err:509

125,567

125,567

Err:509

443,548

443,548

Err:509

291,421

291,421

Err:509

138,711

138,711

Err:509

299,233

299,233

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

-

0

Err:509

946,492

946,492

Err:509

902,565

902,565

Err:509

647,936

647,936

Err:509

1,004,839

1,004,839

Err:509

3,682,390

3,682,390

Err:509

7,733,898

7,733,898

Err:509

2,326,881

2,326,881

Err:509

3,010,859

3,010,859

Err:509

15,325

15,325

Err:509

130,316

130,316

Err:509

46,805

46,805

Err:509

14,970

14,970

Err:509

46,230

46,230

Err:509

42,780

42,780

Err:509

394,762

394,762

Err:509

323,787

323,787

Err:509

436,360

436,360

Err:509

661,043

661,043

Err:509

487,593

487,593

Err:509

761,465

761,465

Err:509

190,179

190,179

Err:509

676,506

676,506

Err:509

302,430

302,430

Err:509

841,460

841,460

Err:509

219,891

219,891

Err:509

296,263

296,263

Err:509

166,967

166,967

Err:509

187,502

187,502

Err:509

196,136

196,136

Err:509

230,770

230,770

Err:509

275,934

275,934

Err:509

91,027

91,027

Err:509

874,808

874,808

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

76,902

76,902

Err:509

116,190

116,190

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

144,490

144,490

406,329

406,329

86,201

86,201

19,714

19,714

16,429

16,429

20,536

20,536

331,054

331,054

-

0

526,186

526,186

-

0

280,383

280,383

818,855

818,855

758,785

758,785

614,032

614,032

331,563

331,563

647,671

647,671

718,769

718,769

526,307

526,307

465,651

465,651

67,390

67,390

488,006

488,006

198,514

198,514

201,515

201,515

59,311

59,311

54,273

54,273

63,877,709

63,877,709

77,241

77,241

273,795

273,795

902,565

902,565

55,912,661

55,912,661

8.7651

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 1.2 : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK =

No.

U RAIAN

A.

Sewa Tanah

B.

PERALATAN Periksa lembar 1.2-2

C. 1 2 3 4 5 6

MOBILISASI FASILITAS KONTRAKTOR Base Camp Kantor Barak Bengkel Gudang, dan lain-lain ......................

1

MOBILISASI FASILITAS LABORATORIUM Ruang Laboratorium (sesuai Gambar)

D.

5.1800 %

2

Soil & Aggregate Testing Compaction Test CBR Test Specific Gravity Atterberg Limits Grain Size Analysis Field Density Test by Sand Cone Methode Moisture Content Abrasion of Aggregate by Los Angeles Machine

3

Bituminous Testing Marshall Asphalt Test Extraction Test, Centrifuge/Refflux Method Specific Gravity for Coarse Aggregate Specific Gravity for Fine Aggregate Mix Air Viod Content (Accurate Method) Core Drill Metal Thermometer Accessories and Tolls Penetration Test Softening Point Refusal Density Compactor

4

Concrete Testing

SATUAN

HARGA SATUAN (Rp.)

VOL.

M2

50,000

100 50

....

set

1

50,000 75,000 50,000 50,000 50,000

Slump Cone Cylinder/Cube Mould for Compressive Strength Beam Mould for Flexural Strength (RIGID) Crushing Machine 5

Pendukung

(Periksa Fasilitas Laboratorium)

6

Operasional

(Periksa Fasilitas Laboratorium)

E. E.I. 1 2 3 4 5 6

MOBILISASI LAINNYA PEKERJAAN DARURAT Perkuatan Jembatan Lama Pemeliharaan Jalan Kerja / Samping ...................... ...................... ...................... ......................

.... .... .... ....

E.II. 1 2 3 4 5 6

LAIN-LAIN Komunikasi Lapangan Lengkap ...................... ...................... ...................... ...................... ......................

Set .... .... .... .... .... ....

LS

F.

Manajemen dan Keselamatan lalu lintas

LS

G.

DEMOBILISASI

LS

1

5,000,000

1

2,000,000

1

10,000,000

Total Biaya Mobilisasi Catatan :Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

No.

B. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

: 1.2 : MOBILISASI

JENIS ALAT

KODE ALAT

SATUAN

E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35 E37 E36 E38 E39 E40 E41 E42

Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit

HARGA SATUAN (Rp.)

VOL.

PERALATAN ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3.5 TON DUMP TRUCK 10 TON EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER TRONTON COLD MILLING MACHINE ROCK DRILL BREAKER COLD RECYCLER HOT RECYCLER AGGREGAT (CHIP) SPREADER ASPHALT DISTRIBUTOR SLIP FORM PAVER

1 1 1 5 1 5 4 1 1 1 1 1 1 1 1 5 1 1 1 2

1 1 1 1

50,000,000 15,000,000 5,000,000 15,000,000 5,000,000 1,000,000 15,000,000 5,000,000 10,000,000 15,000,000 5,000,000 5,000,000 15,000,000 15,000,000 15,000,000 15,000,000 15,000,000 15,000,000 15,000,000 1,000,000 40,000,000 100,000 5,000,000 10,000,000 1,000,000 1,000,000 10,000,000 1,000,000 10,000,000 15,000,000 15,000,000 5,000,000 15,000,000 5,000,000

43 44 45 46 47 48 49 50 51 52 53

CONCRETE PAN MIXER CONCRETE BREAKER ASPAHLT TANKER CEMENT TANKER CONDRETE MIXER (350) VIBRATING RAMMER TRUK MIXER (AGITATOR) BORE PILE MACHINE CRANE ON TRACK 75-100 TON

Total untuk Item B pada Lembar 1

E43 E44 E45 E46 E47 E48 E49 E50 E51

Unit Unit Unit Unit Unit Unit Unit Unit Unit

Lembar 1.2-1 JUMLAH HARGA (Rp.)

0

10,000,000

5,000,000 3,750,000 0 0 0

0

5,000,000

2,000,000

2,000,000

10,000,000

37,750,000

asuk over-head dan laba

Lembar 1.2-2 JUMLAH HARGA (Rp.)

0 15,000,000 5,000,000 0 5,000,000 5,000,000 15,000,000 25,000,000 40,000,000 15,000,000 5,000,000 5,000,000 15,000,000 0 15,000,000 0 15,000,000 15,000,000 15,000,000 5,000,000 0 100,000 5,000,000 0 1,000,000 2,000,000 0 0 10,000,000 15,000,000 15,000,000 5,000,000 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

268,100,000

MOBILISASI FASILITAS LABORATORIUM SATUAN PENGUKURAN HARGA SATUAN

: :

Lump sum Rp.

NO.

SATUAN

VOLUME

URAIAN I. 1.

Laboratory Building Laboratory Building

1. 2. 3 4 5 6 7 8

Soil & Aggregate Testing Compaction Test CBR Test Specifc Gravity Atterberg Limits Grain Size Analysis Field Density Test by Sand Cone Methode Moisture Content Abrasion of Aggregate by Los Angeles Machine

III. 1. 2. 3 4 5 6 7 8 9 10 11

Bituminous Testing Marshall Asphalt Test Extraction Test, Centrifuge/Reflux Method Specific Gravity of Coarse Aggregate Specific Gravity of Fine Aggregate Mix Air Viod Content (Accurate Method) Core Drill Metal Thermometer Accessories and Tolls Penetration Test Softening Point Refusal Density Compactor

1 2 3 4

Concrete Testing Slump Cone Cylinder/Cube Mould for Compressive Strength Beam Mould for Flexural Strength Crushing Machine

1 2 3

Peralatan pendukung Mobil Pick Up Komputer + Printer Furniture

II.

IV.

V.

VI.

Operasional

m2

100.00

65,500,000.00 HARGA SATUAN

55,000.00

VII.

Test Luar Test Luar, sesuai kebutuhan atau atas perintah Direksi

TOTAL BIAYA MOBILISASI

Rp

1. 2.

Catatan : Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar kontrak) dan biaya lain-lainnya. Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Pengawas.

MANAJEMEN DAN KESELAMATAN LALU LINTAS SATUAN PENGUKURAN HARGA SATUAN

: :

Lump sum Rp.

NO.

RAMBU KONSTRUKSI DAN PENGALIHAN

SATUAN

ZONA 1

1 2 3 4 5 6 7 8

Rambu Tetap Rambu batas kecepatan Rambu perintah mengikuti lajur Rambu pengarah tikungan Rambu larangan berjalan terus (give away) Rambu larangan menyalip kendaraan lain Rambu peringatan jalan licin Rambu pengarah tikungan ganda Rambu APILL

buah buah buah buah buah buah buah buah

8 2

1 2 3 4

Rambu Peringatan Sementara Rambu Peringatan dengan kata kata Rambu Peringatan pekerjaan di jalan Rambu Peringatan lalu liontas dua arah Water barier

buah buah buah buah

8 4

0.00 VOLUME

5 6 7 8 9 10

Traffic Cone Police line Concrete Barier Lampu sementara APILL sementara Marka jalan sementara

buah buah buah buah buah buah

Catatan : Kolom volume adalah jumlah kebutuhan zona di lapangan dikalikan kolom ZONA 1, 2, dstnya contoh : misal di lapangan dibutuhkan dua ZONE 1 maka volume diisi dengan 2 dikali 8 = 16

TOTAL

5,500,000.00

10,000,000.00

10,000,000.00

20,000,000.00

10,000,000.00

KETERANGAN

10,000,000.00

65,500,000.00

pi tidak termasuk PPN

ZONA 2

8

1 2

8 4

VOLUME

ZONA 3

8

VOLUME

ZONA 4

VOLUME

4

ZONA 5

VOLUME

4 2

ZONA 6

VOLUME

8 2

ZONA 7

20 1

4

2 4

4

16 4

24 4

4

8 4

4 2

4 2

2

VOLUME

ZONA 8

VOLUME

12

ZONA 9

12 1

1

2

10 4 2

VOLUME

10 4 4

Biaya mobilisasiTOTAL

KETERANGAN

-

-

lihat spesifikasi

lihat spesifikasi

-

lihat spesifikasi lihat spesifikasi lihat spesifikasi lihat spesifikasi lihat spesifikasi

Perhitungan Kebutuhan Alat untuk Mobilisasi No

Nama Alat No Item Pekerjaan

1

Kode Jadwal Pekerjaan Alat bulan Hari Kerja Jam Kerja per hari

2

1 Asphalt Mixing Plant 6.3 (1) 6.3 (2) 6.3 (3) 6.3(3a) 6.3(4) 6.3(4a) 6.3(5a) 6.3(5b) 6.3(5c) 6.3(5d) 6.3(6a) 6.3(6b) 6.3(6c) 6.3(6d) 6.3(7a) 6.3(7b) 6.3(7c) 6.3(7d) 8.1 (5)

E01

2 Asphalt Finisher 6.3 (1) 6.3 (2) 6.3 (3) 6.3(3a) 6.3(4) 6.3(4a) 6.3(5a) 6.3(5b) 6.3(5c) 6.3(5d) 6.3(6a) 6.3(6b) 6.3(6c) 6.3(6d) 6.3(7a) 6.3(7b) 6.3(7c) 6.3(7d) 6.4 (1) 6.4 (2) 6.4 (3)

E02

3 Asphalt Sprayer 6.6.1 6.6.2 8.1 (7) 8.1 (9)

E03

4 Bulldozer 9.7

E04

Kuantitas Pekerjaan

Sat

total

Target Produksi Tiap Jam

3

4

5

6=4x5

7

8=7:6

3 9 9 9 9 9 9 9 9 2 9 9 9 9 9 9 9 9 9

75 225 225 225 225 225 225 225 225 50 225 225 225 225 225 225 225 225 225

7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7

525 1575 1575 1575 1575 1575 1575 1575 1575 350 1575 1575 1575 1575 1575 1575 1575 1575 1575

1 1 1 1 1 1 1 1 1 1 1 1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 1

M2 M2 M2 Ton M3 Ton M2 M2 Ton Ton M3 M3 Ton Ton M3 M3 Ton Ton M3

0.002 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.003 0.001 0.001 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.001

9 9 9 9 2 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9

225 225 225 225 50 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225

7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7

1575 1575 1575 1575 350 1575 1575 1575 1575 1575 1575 1575 1575 1575 1575 1575 1575 1575 1575 1575 1575

1 1 1 1 1 1 1 1 1 1 1 1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 1 1 1

M2 M2 M2 Ton M3 Ton M2 M2 Ton Ton M3 M3 Ton Ton M3 M3 Ton Ton M2 M2 M2

0.001 0.001 0.001 0.001 0.003 0.001 0.001 0.001 0.001 0.001 0.001 0.001 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.001 0.001 0.001

9 9 9 9

225 225 225 225

7 7 7 7

1575 1575 1575 1575

1 1 1 1

7

175

7

1225

M3 M3 M3 Liter

jam

0.001 0.001 0.001 0.001

0.000

5 Concrete Mixer 7.1(5) 7.1(6) 7.1(8) 7.9 9.18

E06

6 Concrete Vibrator 7.1(5) 7.1(6) 7.1(8) 7 Compressor 6.1(1) 9.17

E05

8 Crane 9.12

E07

9 Dump Truck 2.1

E08

4 4 4 4 7

100 100 100 100 175

7 7 7 7 7

700 700 700 700 1225

m3 m3 m3 m3 jam

0.000 0.000 0.000 0.000 0.000

4 4 4

100 100 100

7 7 7

700 700 700

m3 m3 m3

0.000 0.000 0.000

9 7

225 175

7 7

1575 1225

liter jam

0.000 0.000

7

175

7

1225

jam

0.000

7

175

7

1225

m3

0.000

3.1(1) 3.2(2) 4.2(1) 5.1(1) 5.1(2) 6.1(1) 6.1(2) 6.3(5) 6.3(6) 6.3(6)a 6.3(7) 8.1(1) 8.1(5) 8.4(4) 8.4(6) 9.4 10 Excavator 2.1 3.1(1) 9.11

E10

11 Flat Bed Truck 9.5

E11

12 Generator Set 6.3(5) 6.3(6) 6.3(6)a 6.3(7) 8.1(5)

E12

13 Motor Grader 3.2(2) 3.3(1) 4.2(1) 5.1(1) 5.1(2) 9.8

E13

14 Pneumatic Tyred Roller 5.1(1) 5.1(2) 6.3(5) 6.3(6) 6.3(6)a 6.3(7) 15 Tandem Roller 6.3(5) 6.3(6) 6.3(6)a 6.3(7) 8.1(5)

E17

16 Vibrator Roller 3.2(2) 5.1(1) 5.1(2) 9.14

E19

6 6 7 5 5 9 9 9 9 9 9 2 2 2 2 7

150 150 175 125 125 225 225 225 225 225 225 50 50 50 50 175

7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7

1050 1050 1225 875 875 1575 1575 1575 1575 1575 1575 350 350 350 350 1225

m3 m3 m3 m3 m3 liter liter m2 m3 m3 m3 m3 m3 bh bh jam

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

7 6 7

175 150 175

7 7 7

1225 1050 1225

m3 m3 jam

0.000 0.000 0.000

7

175

7

1225

jam

0.000

9 9 9 9 2

225 225 225 225 50

7 7 7 7 7

1575 1575 1575 1575 350

m2 m3 m3 m3 m3

0.000 0.000 0.000 0.000 0.000

6 6 7 5 5 7

150 150 175 125 125 175

7 7 7 7 7 7

1050 1050 1225 875 875 1225

m3 m2 m3 m3 m3 jam

0.000 0.000 0.000 0.000 0.000 0.000

7 5 5 9 9 9

175 125 125 225 225 225

7 7 7 7 7 7

1225 875 875 1575 1575 1575

m3 m3 m2 m3 m3 m3

0.000 0.000 0.000 0.000 0.000 0.000

9 9 9 9 2

225 225 225 225 50

7 7 7 7 7

1575 1575 1575 1575 350

m2 m3 m3 m3 m3

0.000 0.000 0.000 0.000 0.000

6 5 5 7

150 125 125 175

7 7 7 7

1050 875 875 1225

m3 m3 m3 jam

0.000 0.000 0.000 0.000

17 Water Tank 3.3(1) 4.2(1) 5.1(1) 7.1(5) 7.1(6) 7.1(8) 7.9 8.1(1) 9.6

E23

18 Wheel Loader 3.2(2) 4.2(1) 5.1(1) 5.1(2) 6.3(5) 6.3(6) 6.3(6)a 6.3(7) 8.1(1) 8.1(5) 9.9

E15

19 Pedestrian Roller 8.1(1)

E24

6 7 5 4 4 4 4 2 7

150 175 125 100 100 100 100 50 175

7 7 7 7 7 7 7 7 7

1050 1225 875 700 700 700 700 350 1225

m2 m3 m3 m3 m3 m3 m3 m3 jam

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

6 7 5 5 9 9 9 9 2 2 7

150 175 125 125 225 225 225 225 50 50 175

7 7 7 7 7 7 7 7 7 7 7

1050 1225 875 875 1575 1575 1575 1575 350 350 1225

m3 m3 m3 m3 m2 m3 m3 m3 m3 m3 jam

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

2

50

7

350

m3

0.000

Peralatan Yang Diperlukan koefisien alat jumlah alat per item per item

jumlah alat

minimal

kebut. di lapangan

9

10=8x9

11

12

13

0.0007 0.0009 Err:509 0.0201 Err:509 0.0201 Err:509 Err:509 0.0201 0.0201 0.0000 0.0000 0.0201 0.0201 0.0096 0.0000 0.0201 0.0201 0.0554

0.000001 0.000001 Err:509 0.000013 Err:509 0.000013 Err:509 Err:509 0.000013 0.000057 0.000000 0.000000 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0.000035

Err:509

1

1

0.0013 0.0013 Err:509 0.0191 Err:509 0.0041 Err:509 Err:509 0.0137 0.0137 0.0000 0.0000 0.0110 0.0110 0.8542 0.0000 0.0092 0.0092 #REF! #REF! #REF!

0.000001 0.000001 Err:509 0.000012 Err:509 0.000003 Err:509 Err:509 0.000009 0.000009 0.000000 0.000000 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF!

Err:509

1

1

0.3788 0.3788 0.0359 0.0003

0.000241 0.000241 0.000023 0.000000

0.00050

1

1

0.000

0.000

1

1

0.000 0.000 0.000 0.000 0.000

0.000

1

1

0.000 0.000 0.000

0.000

1

1

0.000 0.000

0.000

1

1

0.000

0.000

1

1

0.000

0.000

18

18

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000

0.000

3

3

0.000

0.000

1

1

0.000 0.000 0.000 0.000 0.000

0.000

1

1

0.000 0.000 0.000 0.000 0.000 0.000

0.000

1

1

0.000 0.000 0.000 0.000 0.000 0.000

0.000

1

1

0.000 0.000 0.000 0.000 0.000

0.000

1

1

0.000 0.000 0.000 0.000

0.000

1

1

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000

1

1

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000

3

3

0.000

0.000

1

1

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 1.8 (1) : Pemeliharaan & Perlindungan Lalu Lintas

% TERHADAP TOTAL BIAYA PROYEK =

No.

2.2994 %

U RAIAN

SATUAN

I.

Data & Asumsi

1 2 3 4 5

Jumlah lokasi pekerjaan Total Masa Pelaksanaan Proyek Masa Pemeliharaan & Perlindungan Lalin Sudah termasuk persiapan/pemasangan Pembongkaran termasuk Demobilisasi

II.

Pekerja Pengatur Lalu Lintas Jumlah lokasi pekerjaan Petugas Rambu "Stop-Jalan" Pengendali kecepatan kendaraan Pemimpin Regu (Mandor)

1 2 3 III. 1 2 3 4 5 6 7 8

2 2 1

Bahan & Perlengkapan Jumlah lokasi pekerjaan Rambu "Stop-Jalan" Rambu lain (Batas kec., hati2, dll) Bendera Kuning/Hijau/Merah Barikade Kayu 1/2 lebar jalan Traffic Cone, jumlah per lokasi = 5 Bahan Cat Pantul + Pengencer + Kuas Perlengkapan Keamanan Pekerja Perlengkapan lainnya

HARGA SATUAN (Rp.)

VOL.

JUMLAH HARGA (Rp.)

Lokasi Hari Hari

1 240 180

Lokasi Org/hari Org/hari Org/hari

1 360 360 180

16,429 16,429 19,714

5,914,286 5,914,286 3,548,571

1 2 3 6 2 5 1 5 1

25,000 25,000 15,000 100,000 35,000 40,000 50,000 500,000

50,000 75,000 90,000 200,000 175,000 40,000 250,000 500,000

Lokasi Buah Buah Buah Buah Buah Set Set LS

Total Biaya Pemeliharaan & Perlindungan Lalu Lintas

16,757,143

Catatan :Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba

serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 1.8 (2) : Pemasangan & Pemeliharaan Jembatan Sementara

% TERHADAP TOTAL BIAYA PROYEK =

No.

22 %

U RAIAN

SATUAN

I.

Data & Asumsi

1 2 3 4 5 6

Jembatan sementara jenis Bailley Jembatan sementara konstruksi kayu Sewa jembatan Bailley sudah termasuk angkut, pasang dan bongkar Detour diperlukan length (m) = 300 Total Masa Pelaksanaan Proyek Masa Pemeliharaan Jembatan Efektif

II.

Bahan & Perlengkapan

1 2 3 4 5 6

Biaya jembatan Bailley Biaya jembatan kayu Agg.Kls.B Detour tebal (cm) = 10 Agg.Kls.A Detour tebal (cm) = 10 Prime Coat Detour Sewa tanah

III.

Pekerja Untuk Pemeliharaan

1 2 3

Pekerja Tukang ( Batu/Cat/Las) Pemimpin Regu (Mandor)

9 3 1

VOL.

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

M2 M2

144

M2 Hari Hari

1,200 240 120

M2 M2 M3 M3 Liter M2

0 144 120 120 1,200 1,236

115,000 100,000 1,124,303 0 0 500

0 14,400,000 134,916,359 0 0 618,000

Org/hari Org/hari Org/hari

1,080 360 120

14,286 17,857 17,143

15,428,571 6,428,571 2,057,143

Total Biaya Pemeliharaan & Perlindungan Lalu Lintas

173,848,645

Catatan : Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba

serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

INFORMASI UMUM No.

U RAIAN

I N F O R MAS I

1.

Nomor Paket Kontrak

: ………………………………………………

2.

Nama Paket

3.

Propinsi / Kabupaten / Kotamadya

: Pembangunan Jalan /Jbt Kota Manado …………………………………………………… : SULUT/Kota Manado

4.

Lokasi pekerjaan

Periksa lampiran

5.

Kondisi jalan lama

Hot Mix (Asphalt Beton)

6.

Panjang efektif

( lihat sketsa di bawah )

7.

Lebar jalan lama

( bahu + perkerasan + bahu )

( 1.00

+ 4.50

+ 1.00

)

8.

Lebar Rencana

( bahu + perkerasan + bahu )

( 2.00

+ 7.00

+ 2.00

)

9.

Penampang jalan, jenis dan volume pekerjaan pokok

10.

Jangka waktu pelaksanaan pekerjaan

240 hari kalender Atau : 8.00 bulan (Periode Pelaksanaan)

11.

Jarak rata-rata Base Camp ke lokasi pekerjaan --->

L=

Perhitungan didasarkan pada sketsa di bawah ini :

L = { (c+a/2)*a + (c+b/2)*b } / (a+b)

2.00 Km = a

5.0 Kilometer ( Leff = a + b )

Lihat lampiran.

3.00 Kilometer

2.00 Km = b

C

A

B 2 Km = c Base Camp ---------> Kalkulasi Jarak Rata-Rata =

D 3

12. 13. 14. 15.

Jam kerja efektif dalam 1 hari Asuransi, Pajak, dsb. untuk Peralatan Tingkat Suku Bunga Investasi Alat Biaya Umum dan Keuntungan

16.

RINGKASAN METODE PELAKSANAAN

a.

Mobilisasi dilaksanakan sesuai ketentuan yang berlaku dalam Kontrak.

b.

Pekerjaan Tanah dilaksanakan untuk Timbunan Oprit ........................................................................... Pekerjaan Lapis Pondasi Agregat dilaksanakan untuk Oprit Jembatan ........................................................................... Pekerjaan Campuran Aspal Panas dilaksanakan untuk Oprit Jembatan

c. d.

7.0 0.002 10.00 15.00

jam x Harga Pokok Alat % % x Biaya Langsung

e. f. g.

........................................................................... Pekerjaan Pasangan Batu dilaksanakan untuk tembok penahan dan proteksi abutmen pada Oprit Jembata ........................................................................... Pekerjaan Pengembalian Kondisi dilaksanakan untuk jalan dalam kondisi mantap dan dapat melayani lalu ........................................................................... ........................................................................... ...........................................................................

17.

Lokasi Quarry

:

Periksa lampiran.

18

Jumlah Jembatan = 1 Buah

Periksa lampiran.

19

Total Bentang Jembatan = 31.0 m

Periksa lampiran.

20

....................................

21

....................................

22

....................................

FORMASI UMUM I N F O R MAS I

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado ………………………………………………………………….

Kilometer ( Leff = a + b ) meter meter

bulan (Periode Pelaksanaan)

L = { (c+a/2)*a + (c+b/2)*b } / (a+b)

kan untuk tembok penahan dan proteksi abutmen pada Oprit Jembatan

ksanakan untuk jalan dalam kondisi mantap dan dapat melayani lalu lintas

No

Jenis Peralatan

1 Helmet 2 Rompi 3 Sepatu 4 Dll

Satuan Buah Buah Buah Buah

Total

Harga 40,000.00 50,000.00 75,000.00 165,000.00

Periode Konstruksi Jam Pemakaian

Hari jam

180.00 7.00

Koefesian

jam

130.9523809524

HARGA & JARAK RATA-RATA DARI SUMBER BAHAN (QUARRY) No.

1.

U RAIAN

SATUAN

HARGA ROYALTY (Rp)

JARAK QUARRY ( Km )

KET.

2.

M01 - P a s i r Pasang M01 - P a s i r Beton M02 - Batu Kali

M3 M3 M3

60,000.00 60,000.00 70,000.00

25.00 Ke Base Camp 25.00 Ke Lokasi Pek. 25.00 Ke Lokasi Pek.

3.

M06 - Batu Belah/Batu Quarry Besar

M3

60,000.00

25.00 Ke Lokasi Pek.

4.

M07 - G r a v e l

M3

55,000.00

25.00 Ke Base Camp

5.

M10 - Aspal Cement (Pelabuhan)

KG

12,000.00

10.00 Ke Base Camp

6.

M16 - S i r t u

M3

35,000.00

25.00 Ke Lokasi Pek.

7.

M44 - Pasir Urug

M3

52,000.00

25.00 Ke Lokasi Pek.

8

M08 - Tanah Timbun

M3

60,000.00

5.00 Ke Lokasi Pek.

9

M09 - Material Pilihan

M3

75,000.00

5.00 Ke Lokasi Pek.

Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M01a - Pasir Pasang Lokasi : Quarry Tujuan : Base Camp

No.

URAIAN

I. 1 2 3 4 5 6 7 II. 1 2 3

III.

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi Base Camp Harga satuan pasir di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume pasir

KODE

L RpM01 RpE10 RpE09 Bil

KOEF.

SATUAN

25.00 1.00 1.00 1.00 1.42

Km M3 Jam Jam ton/m3

0.93 0.90 0.83

M3 -

0.50 0.50 1.00

menit menit menit

HARGA SATUAN (Rp.)

60,000.00 563,192.52 495,785.15

URUTAN KERJA Pasir digali dengan Excavator Excavator sekaligus memuat pasir hasil galian ke dalam Dump Truck Dump Truck mengangkut pasir ke lokasi Base Camp PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

41.6826 M3 / Jam

13,511.45

Rupiah

10.00 0.83 30.00 40.00

ton KM/Jam KM/Jam

10.14 50.00 37.50 1.00 98.64

menit menit menit menit menit Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M01a - Pasir Pasang Lokasi : Quarry Tujuan : Base Camp

No.

IV.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Rp2

139,441.56

Rupiah

M01

212,953.01

Rupiah

M01

213,000.00

Rupiah

3.56 M3 / Jam

HARGA SATUAN DASAR BAHAN DI LOKASI BASE CAMP Harga Satuan Dasar Pasir = ( RpM01 + Rp1 + Rp2 ) Dibulatkan :

Lanjutan HARGA SATUAN (Rp.)

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M02 - Batu Kali Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

URAIAN

I. 1 2 3 4 5 6 7 II. 1 2 3

III.

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke Lokasi Pekerjaan Harga satuan batu kali di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume batu kali

KODE

L RpM02 RpE10 RpE09 Bil

KOEF.

SATUAN

25.00 1.00 1.00 1.00 1.44

Km M3 Jam Jam ton/m3

0.93 0.75 0.83

M3 -

0.75 0.50 1.25

menit menit menit

HARGA SATUAN (Rp.)

70,000.00 563,192.52 495,785.15

URUTAN KERJA Batu kali digali dengan Excavator Excavator sekaligus memuat batu kali hasil galian ke dalam Dump Truck Dump Truck mengangkut batu kali ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

27.7884 M3 / Jam

20,267.18

Rupiah

10.00 0.83 25.00 35.00

ton KM/Jam KM/Jam

14.99 60.00 42.86 1.00 118.85

menit menit menit menit menit Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M02 - Batu Kali Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

IV.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Rp2

170,384.86

Rupiah

M02

260,652.04

Rupiah

M02

260,700.00

Rupiah

2.91 M3 / Jam

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar Batu kali = ( RpM02 + Rp1 + Rp2 ) Dibulatkan :

Lanjutan HARGA SATUAN (Rp.)

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M06 - Batu Belah Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

URAIAN

I. 1 2 3 4 5 6 7 8 9 II. 1 2 3

III. 3.a

3.b

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke Lokasi Pekerjaan Harga satuan batu kali di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Harga Satuan Dasar Wheel Loader Harga Satuan Upah Pekerja Berat volume batu belah

KODE

L RpM06 RpE10 RpE09 RpE15 RpL01 Bil

KOEF.

SATUAN

25.00 1.00 1.00 1.00 1.00 1.00 1.60

Km M3 Jam Jam Jam Jam ton/m3

0.93 0.75 0.83

M3 -

0.75 0.50 1.25

menit menit menit

HARGA SATUAN (Rp.)

60,000.00 563,192.52 495,785.15 533,941.26 14,285.71

URUTAN KERJA Batu kali digali dengan Excavator Batu kali dibelah oleh Pekerja Dengan Wheel Loader batu belah dimuat ke Dump Truck yang mengangkut batu belah ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

WHEEL LOADER Kapasitas Bucket Faktor Bucket Faktor Efisiensi Alat Waktu sklus - Muat - Lain-lain

(E15) V Fb Fa Ts1 T1 T2 Ts1

Kapasitas Produksi / Jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q2) x RpE15

Q2 Rp2

27.7884 M3 / Jam

20,267.18

Rupiah

1.50 0.75 0.83

M3 -

0.75 0.50 1.25

menit menit menit

44.82 M3 / Jam 11,913.01

Rupiah Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M06 - Batu Belah Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

3.c

3.d

IV.

URAIAN

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

KODE

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q3

Biaya Dump Truck / M3 = (1 : Q3) x RpE08

Rp3

KOEF.

SATUAN

10.00 0.83 30.00 40.00

ton KM/Jam KM/Jam

13.49 50.00 37.50 1.00 101.99

menit menit menit menit menit

3.05 M3 / Jam

162,465.95

Rupiah

PEKERJA Produksi menentukan : Excavator Hasil galian batu / hari = Q1 x 7 Jam Kebutuhan Pekerja

Q1 Qt P

27.7884 M3 / Jam 194.5188 M3 / 7 jam 15.00 Orang

Biaya Pekerja / M3 = { (7 Jam x P) : Qt } x RpL01

Rp4

7,711.34

Rupiah

M06

262,357.48

Rupiah

M06

262,400.00

Rupiah

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar Batu belah = ( RpM06 + Rp1 + Rp2 + Rp3 + Rp4 ) Dibulatkan :

Lanjutan HARGA SATUAN (Rp.)

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M07 - Gravel Lokasi : Quarry Tujuan : Base Camp

No.

URAIAN

I. 1 2 3 4 5 6 7 II. 1 2 3

III.

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke Lokasi Pekerjaan Harga satuan Gravel di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume gravel

KODE

L RpM07 RpE10 RpE09 Bil

KOEF.

SATUAN

25.00 1.00 1.00 1.00 2.20

Km M3 Jam Jam ton/m3

0.93 0.75 0.83

M3 -

0.75 0.50 1.25

menit menit menit

HARGA SATUAN (Rp.)

55,000.00 563,192.52 495,785.15

URUTAN KERJA Gravel digali dengan Excavator Excavator sekaligus memuat gravel hasil galian ke dalam Dump Truck Dump Truck mengangkut gravel ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

27.7884 M3 / Jam

20,267.18

Rupiah

10.00 0.83 30.00 40.00

ton KM/Jam KM/Jam

9.81 50.00 37.50 1.00 98.31

menit menit menit menit menit Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M07 - Gravel Lokasi : Quarry Tujuan : Base Camp

No.

IV.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Rp2

215,329.79

Rupiah

M07

290,596.97

Rupiah

M07

290,600.00

Rupiah

2.30 M3 / Jam

HARGA SATUAN DASAR BAHAN DI LOKASI BASE CAMP Harga Satuan Dasar Gravel = ( RpM07 + Rp1 + Rp2 ) Dibulatkan :

Lanjutan HARGA SATUAN (Rp.)

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M16 - Sirtu Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

URAIAN

I. 1 2 3 4 5 6 7 II. 1 2 3

III.

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi Base Camp Harga satuan Sirtu di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume sirtu

KODE

L RpM16 RpE10 RpE09 Bil

KOEF.

SATUAN

25.00 1.00 1.00 1.00 1.51

Km M3 Jam Jam ton/m3

0.93 0.90 0.83

M3 -

0.50 0.50 1.00

menit menit menit

HARGA SATUAN (Rp.)

35,000.00 563,192.52 495,785.15

URUTAN KERJA Sirtu digali dengan Excavator Excavator sekaligus memuat sirtu hasil galian ke dalam Dump Truck Dump Truck mengangkut sirtu ke lokasi Base Camp PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

41.6826 M3 / Jam

13,511.45

Rupiah

10.00 0.83 30.00 40.00

ton KM/Jam KM/Jam

9.53 50.00 37.50 1.00 98.03

menit menit menit menit menit Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M16 - Sirtu Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

IV.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Rp2

147,371.14

Rupiah

M16

195,882.59

Rupiah

M16

195,900.00

Rupiah

3.36 M3 / Jam

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar Sirtu = ( RpM16 + Rp1 + Rp2 ) Dibulatkan :

Lanjutan HARGA SATUAN (Rp.)

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M44 - Pasir Urug Lokasi : Quarry Tujuan : Lokasi Pekerjaan No.

URAIAN

I. 1 2 3 4 5 6 7 II. 1 2 3

III.

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi pekerjaan Harga satuan pasir urug di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume pasir urug

KODE

L RpM44 RpE10 RpE09 Bil

KOEF.

SATUAN

25.00 1.00 1.00 1.00 1.42

Km M3 Jam Jam ton/m3

0.93 0.90 0.83

M3 -

0.50 0.50 1.00

menit menit menit

HARGA SATUAN (Rp.)

52,000.00 563,192.52 495,785.15

URUTAN KERJA pasir urug digali dengan Excavator Excavator sekaligus memuat pasir urug hasil galian ke dalam Dump Truck Dump Truck mengangkut pasir urug ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

41.6826 M3 / Jam

13,511.45

Rupiah

10.00 0.83 30.00 40.00

ton KM/Jam KM/Jam

10.14 50.00 37.50 1.00 98.64

menit menit menit menit menit Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M44 - Pasir Urug Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

IV.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Rp2

139,441.56

Rupiah

M44

204,953.01

Rupiah

M44

205,000.00

Rupiah

3.56 M3 / Jam

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar pasir urug = ( RpM44 + Rp1 + Rp2 ) Dibulatkan :

Lanjutan HARGA SATUAN (Rp.)

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M1c- Pasir Beton Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

URAIAN

I. 1 2 3 4 5 6 7 II. 1 2 3

III.

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi pekerjaan Harga satuan pasir urug di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat isi volume pasir beton

KODE

L RpM44 RpE10 RpE09 Bil

KOEF.

SATUAN

25.00 1.00 1.00 1.00 1.69

Km M3 Jam Jam ton/m3

0.50 0.90 0.83

M3 -

0.50 0.50 1.00

menit menit menit

HARGA SATUAN (Rp.)

60,000.00 563,192.52 495,785.15

URUTAN KERJA pasir urug digali dengan Excavator Excavator sekaligus memuat pasir urug hasil galian ke dalam Dump Truck Dump Truck mengangkut pasir urug ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T1 T2 T4 Ts2

22.41 M3 / Jam

25,131.30

Rupiah

10.00 0.83 30.00 40.00

ton KM/Jam KM/Jam

15.84 50.00 37.50 1.00 104.34

menit menit menit menit menit Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M1c- Pasir Beton Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

IV.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Rp2

175,554.50

Rupiah

M44

260,685.80

Rupiah

M44

260,700.00

Rupiah

2.82 M3 / Jam

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar pasir urug = ( RpM44 + Rp1 + Rp2 ) Dibulatkan :

Lanjutan HARGA SATUAN (Rp.)

Formulir Penentuan Harga Bahan Bahan : Semen No

Uraian Kegiatan

Biaya Rp/satuan

Jumlah (Rp)

Jumlah Kombinasi (Rp)

1 Harga di Cibinong

Rp/ton

1,200,000.00

1,200,000.00

2 Handling

Rp/ton

2,500.00

2,500.00

3 Transport ke proyek

Rp/ton

3,500.00

3,500.00

4 Pembongkaran, gudang

Rp/ton

1,250.00

1,250.00

5 Waste 5%

Rp/ton

2,250.00

2,250.00

subtotal

Rp/ton

1,209,500.00

Rp/ton

60,475.00

total jumlah

Rp/ton Rp/zak

1,269,975.00 63,498.75

Harga Netto Harga setelah ditambah

Rp/zak Rp/zak

63,498.75 63,498.75

6 Keuntungan & Overhead 5 % (hanya utk pekerjaan harian)

7 8

Bahan : Aspal No

Uraian Kegiatan

Biaya Rp/satuan

Jumlah (Rp)

1 Harga di pelabuhan dari Jakarta

Rp/ton

12,000,000.00

12,000,000.00

2 Handling

Rp/ton

1,500.00

1,500.00

3 Transport ke proyek

Rp/ton

10,000.00

3,360.00

4 Pembongkaran, gudang

Rp/ton

5,000.00

1,500.00

5 Waste 2%

Rp/ton

4,300.00

4,300.00

subtotal

Rp/ton

12,010,660.00

Rp/ton

600,533.00

total jumlah

Rp/ton Rp/kg

12,611,193.00 12,611.19

Harga Netto

Rp/kg

12,611.19

6 Keuntungan & Overhead 5 % (hanya utk pekerjaan harian)

7

Jumlah Kombinasi (Rp)

8

Harga setelah ditambah

Rp/kg

12,611.19

DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

URAIAN

ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3.5 TON DUMP TRUCK 10 TON EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER TRONTON COLD MILLING ROCK DRILL BREAKER

KO DE

E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35 E36 E37

HP

294.0 72.4 4.0 155.0 60.0 20.0 138.0 100.0 190.0 133.0 190.0 180.0 135.0 70.0 96.0 55.0 82.0 100.5 82.0 5.5 220.0 6.0 100.0 8.8 4.7 0.0 345.0 100.0 175.0 25.0 125.0 40.0 150.0 5.0 150.0 248.0 3.0 -

KAP.

60.0 T/Jam 10.0 Ton 850.0 Liter 5,000.0 CPM/(L/m) 500.0 Liter 15.0 Ton 3.5 Ton 10.0 Ton 0.9 M3 10.0 ton 135.0 KVA 10,800.0 0.8 M3 1.5 M3 8.0 Ton 8.1 Ton 9.0 Ton 7.1 Ton 25.0 60.0 T/Jam 4,000.0 Liter 835.00 Ton 121.00 Ton 1,330.00 2,005.00 8.00 M3 20.00 Ton 2.50 Ton 35.0 Ton 250.0 Amp 2,000.0 Meter 1,000.0 Liter 15.0 Ton 1,000.0 m -

HARGA ALAT

3,300,000,000 2,205,000,000 87,000,000 1,911,000,000 110,000,000 175,500,000 1,488,000,000 300,000,000 500,000,000 1,254,400,000 330,800,000 207,000,000 1,666,000,000 542,000,000 1,421,000,000 350,000,000 1,195,425,000 900,000,000 962,000,000 4,000,000 1,010,989,671 5,000,000 105,000,000 150,000,000 17,000,000 35,000,000 900,000,000 112,500,000 600,000,000 875,000,000 850,000,000 17,500,000 2,250,000,000 15,000,000 450,000,000 4,945,000,000 900,000,000

38 39 40 41 42 43 44 45 46 47 48 49 50 51

COLD RECYCLER HOT RECYCLER AGGREGAT (CHIP) SPREADER ASPHALT DISTRIBUTOR SLIP FORM PAVER CONCRETE PAN MIXER CONCRETE BREAKER ASPAHLT TANKER CEMENT TANKER CONDRETE MIXER (350) VIBRATING RAMMER TRUK MIXER (AGITATOR) BORE PILE MACHINE CRANE ON TRACK 75-100 TON

E38 E39 E40 E41 E42 E43 E44 E45 E46 E47 E48 E49 E50 E51

900.0 400.0 115.0 115.0 105.0 134.0 290.0 190.0 190.0 20.0 4.2 220.0 125.0 200.0

2,200.0 3.0 3.5 4,000.0 2.5 600.0 20.0 4,000.0 4,000.0 350.0 80.0 5.0 60.0 75.0

M M M Liter M Liter m3/jam liter liter liter KG M3 CM Ton

19,500,000,000 29,250,000,000 395,000,000 450,000,000 1,337,142,857 1,000,000,000 900,000,000 500,000,000 500,000,000 35,000,000 20,000,000 950,000,000 1,170,000,000 900,000,000

52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67

BLENDING EQUIPMENT ASPHALT LIQUID MIXER BAR BENDER BAR CUTTER BREAKER GROUTING PUMP JACK HIDROLIC MESIN LAS PILE DRIVER LEADER, 75 kw PILE HAMMER PILE HAMMER, 2,5 Ton STRESSING JACK WELDING MACHINE, 300 A BABY ROLLER GRASS CUTTER PICK UP

E52 50.0 E34a 40.0 E53 3.0 E54 3.0 E55 80.0 E56 100.0 E57 3.0 E58 3.0 E59 70.0 E60 10.0 E61 1.0 E62 89.0 E63 5.0 E53 6.0 E54 1.0 E55 80.0

30.0 Ton 20,000.0 Liter

3.0 15.0 150.0 0.2 75.0

m3/jam Ton Ton Ton kw

2.5 Ton 15.0 Ton 1.0 Ton Ton 1.0 Ton

500,000,000 15,000,000 250,000,000 6,000,000 120,000,000

Menyetujui,

Dibuat Oleh,

Plt. KEPALA DINAS PEKERJAAN UMUM

CV DAYA ABADI GEMILANG

KOTA MANADO

Ir. FERRY SIWI, M.Si

ANNEKE I. UNTU, ST

NIP. 19590626 199103 1 008

Direktur

BIAYA SEWA PERALATAN PER JAM KERJA BIAYA SEWA ALAT/JAM (di luar PPN) 5,782,563.38 902,423.18 72,784.89 751,333.11 172,621.19 175,230.07 625,016.51 287,873.37 495,785.15 563,192.52 457,552.91 411,499.20 659,813.19 288,315.42 533,941.26 217,811.32 457,658.59 424,352.69 404,914.14 53,568.78 683,344.94 51,574.72 243,811.40 98,426.36 58,600.29 47,194.27 1,274,973.32 243,775.21 482,029.71 282,199.72 444,273.04 115,559.99 784,275.69 52,063.89 530,728.76 1,640,750.59 328,231.26

KET.

6,108,397.89 7,407,496.84 536,621.12 384,601.49 546,406.61 645,958.07 802,682.98 519,192.37 488,092.37 88,274.46 59,062.44 651,706.64 636,874.23 604,248.69

T x Te1 x Te2 x Fa

228,755.17 115,343.89 28,077.32 28,077.32 183,925.71 220,085.71 44,709.71 45,934.46 165,845.71 61,448.21 41,093.71 200,197.71 48,325.71 89,948.29 24,789.32 208,943.64

CV DAYA ABADI GEMILANG

URAIAN ANALISA ALAT No.

A. 1. 2. 3. 4.

U RAIAN

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

KODE

KOEF.

SATUAN

Pw Cp A W B

TRONTON 150.0 15.0 10.0 1,500.0 450,000,000

HP Ton Tahun Jam Rupiah

Rupiah

E35

5.

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

45,000,000

2.

Faktor Angsuran Modal

D

0.16275

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

43,941.26

Rupiah

b. Asuransi, dll

F

600.00

Rupiah

G

44,541.26

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

174,937.50

Rupiah

2.

Pelumas

I

157,500.00

Rupiah

J

26,250

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 3 Orang / Jam ) x U2

K

52,500.00

Rupiah

L M

21,428.57 53,571.43

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

486,187.50

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

530,728.76 Rupiah

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi

i U1 U2 Mb Ms Mp

4. 5.

KET.

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

494,500,000

2.

Faktor Angsuran Modal

D

0.26380

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

587,015.34

Rupiah

b. Asuransi, dll

F

4,945.00

Rupiah

G

591,960.34

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

COLD MILLING MACHINE Pw 248.0 HP Cp 1,000 m A 5.0 Tahun W 2,000.0 Jam B 4,945,000,000 Rupiah

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

231,384.00

Rupiah

2.

Pelumas

I

217,000.00

Rupiah

J

216,344

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 3 Orang / Jam ) x U2

K

309,062.50

Rupiah

L M

21,428.57 53,571.43

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

1,048,790.25

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

1,640,750.59 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E37

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

90,000,000

2.

Faktor Angsuran Modal

D

0.16275

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

87,882.51

Rupiah

b. Asuransi, dll

F

1,200.00

Rupiah

G

89,082.51

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

ROCK DRILL BREAKER Pw 3.0 HP Cp A 10.0 Tahun W 1,500.0 Jam B 900,000,000 Rupiah

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

3,498.75

Rupiah

2.

Pelumas

I

3,150.00

Rupiah

J

52,500

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 3 Orang / Jam ) x U2

K

105,000.00

Rupiah

L M

21,428.57 53,571.43

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

239,148.75

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

328,231.26 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E36

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

A. 1. 2. 3. 4.

U RAIAN

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

KODE

KOEF.

SATUAN

COLD RECYCLER Pw 900.0 HP Cp 2,200 M A 5.0 Tahun W 2,000.0 Jam B ### Rupiah

5.

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

1,950,000,000

2.

Faktor Angsuran Modal

D

0.26380

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

2,314,822.89

Rupiah

b. Asuransi, dll

F

19,500.00

Rupiah

G

2,334,322.89

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

839,700.00

Rupiah

2.

Pelumas

I

787,500.00

Rupiah

J

853,125

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 3 Orang / Jam ) x U2

K

1,218,750.00

Rupiah

L M

21,428.57 53,571.43

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

3,774,075.00

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

6,108,397.89 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E38

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

2,925,000,000

2.

Faktor Angsuran Modal

D

0.26380

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

3,472,234.34

Rupiah

b. Asuransi, dll

F

29,250.00

Rupiah

G

3,501,484.34

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

Pw Cp A W B

HOT RECYCLER 400.0 HP 3 M 5.0 Tahun 2,000.0 Jam ### Rupiah

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

373,200.00

Rupiah

2.

Pelumas

I

350,000.00

Rupiah

J

1,279,688

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 3 Orang / Jam ) x U2

K

1,828,125.00

Rupiah

L M

21,428.57 53,571.43

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

3,906,012.50

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

7,407,496.84 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E39

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

39,500,000

2.

Faktor Angsuran Modal

D

0.31547

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

112,149.87

Rupiah

b. Asuransi, dll

F

790.00

Rupiah

G

112,939.87

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

AGGREGAT (CHIP) SPREADER Pw 115.0 HP Cp 3.5 M A 4.0 Tahun W 1,000.0 Jam B 395,000,000.0 Rupiah

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

134,118.75

Rupiah

2.

Pelumas

I

120,750.00

Rupiah

J

24,688

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 13 Orang / Jam ) x U2

K

69,125.00

Rupiah

L M

21,428.57 53,571.43

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

423,681.25

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

536,621.12 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E40

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

45,000,000

2.

Faktor Angsuran Modal

D

0.26380

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

53,418.99

Rupiah

b. Asuransi, dll

F

450.00

Rupiah

G

53,868.99

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

ASPHALT DISTRIBUTOR Pw 115 HP Cp 4,000 Liter A 5.0 Tahun W 2,000.0 Jam B 450,000,000 Rupiah

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

107,295.00

Rupiah

2.

Pelumas

I

100,625.00

Rupiah

J

19,688

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 3 Orang / Jam ) x U2

K

28,125.00

Rupiah

L M

21,428.57 53,571.43

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

330,732.50

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

384,601.49 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E41

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

133,714,286

2.

Faktor Angsuran Modal

D

0.22961

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

138,158.04

Rupiah

b. Asuransi, dll

F

1,337.14

Rupiah

G

139,495.18

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

SLIP FORM PAVER Pw 105 HP Cp 2.50 M A 6.0 Tahun W 2,000.0 Jam B 1,337,142,857 Rupiah

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

97,965.00

Rupiah

2.

Pelumas

I

91,875.00

Rupiah

J

58,500

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 3 Orang / Jam ) x U2

K

83,571.43

Rupiah

L M

21,428.57 53,571.43

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

406,911.43

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

546,406.61 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E42

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

100,000,000

2.

Faktor Angsuran Modal

D

0.16275

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

97,647.24

Rupiah

b. Asuransi, dll

F

1,333.33

Rupiah

G

98,980.57

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

CONCRETE PAN MIXER Pw 134 HP Cp 600.00 Liter A 10.0 Tahun W 1,500.0 Jam B 1,000,000,000 Rupiah

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

156,277.50

Rupiah

2.

Pelumas

I

140,700.00

Rupiah

J

58,333

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

116,666.67

Rupiah

L M

21,428.57 53,571.43

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

546,977.50

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

645,958.07 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E43

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

90,000,000

2.

Faktor Angsuran Modal

D

0.26380

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

106,837.98

Rupiah

b. Asuransi, dll

F

900.00

Rupiah

G

107,737.98

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

CONCRETE BREAKER Pw 290 HP Cp 20.00 m3/jam A 5.0 Tahun W 2,000.0 Jam B 900,000,000 Rupiah

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

270,570.00

Rupiah

2.

Pelumas

I

253,750.00

Rupiah

J

39,375

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

56,250.00

Rupiah

L M

21,428.57 53,571.43

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

694,945.00

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

802,682.98 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E44

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

A. 1. 2. 3. 4.

U RAIAN

KODE

KOEF.

SATUAN

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

ASPAHLT TANKER Pw 190 HP Cp 4,000.00 liter A 6.0 Tahun W 2,000.0 Jam B 500,000,000 Rupiah

Kapasitas tangki air

Ca

4,000.00

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

50,000,000

2.

Faktor Angsuran Modal

D

0.22961

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

51,661.66

Rupiah

b. Asuransi, dll

F

500.00

Rupiah

G

52,161.66

Rupiah

H1 H2

177,270.00 31,100.00

Rupiah Rupiah

I

166,250.00

Rupiah

J

21,875

Rupiah

5.

B. 1.

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms Bahan Bakar Pemanas Aspal = 1/1000 x ca x Ms

2.

Pelumas Biaya bengkel

3.

liter

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

31,250.00

Rupiah

L M

21,428.57 17,857.14

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

467,030.71

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

519,192.37 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E45

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

50,000,000

2.

Faktor Angsuran Modal

D

0.22961

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

51,661.66

Rupiah

b. Asuransi, dll

F

500.00

Rupiah

G

52,161.66

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

CEMENT TANKER Pw 190 HP Cp 4,000.00 liter A 6.0 Tahun W 2,000.0 Jam B 500,000,000 Rupiah

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

177,270.00

Rupiah

2.

Pelumas

I

166,250.00

Rupiah

J

21,875

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

31,250.00

Rupiah

L M

21,428.57 17,857.14

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

435,930.71

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

488,092.37 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E46

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

3,500,000

2.

Faktor Angsuran Modal

D

0.57619

-

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

9,075.00

Rupiah

b. Asuransi, dll

F

35.00

Rupiah

G

9,110.00

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

CONDRETE MIXER (350) Pw 20 HP Cp 350.00 liter A 2.0 Tahun W 2,000.0 Jam B 35,000,000 Rupiah

Rupiah

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

18,660.00

Rupiah

2.

Pelumas

I

17,500.00

Rupiah

J

1,531

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

2,187.50

Rupiah

L M

21,428.57 17,857.14

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

79,164.46

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

88,274.46 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

4. 5.

KET.

E47

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

2,000,000

2.

Faktor Angsuran Modal

D

0.31547

-

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

5,678.47

Rupiah

b. Asuransi, dll

F

40.00

Rupiah

G

5,718.47

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

VIBRATING RAMMER Pw 4 HP Cp 80.00 KG A 4.0 Tahun W 1,000.0 Jam B 20,000,000 Rupiah

Rupiah

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

4,898.25

Rupiah

2.

Pelumas

I

4,410.00

Rupiah

J

1,250

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

3,500.00

Rupiah

L M

21,428.57 17,857.14

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

53,343.96

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

59,062.44 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

4. 5.

KET.

E48

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

95,000,000

2.

Faktor Angsuran Modal

D

0.26380

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

112,773.42

Rupiah

b. Asuransi, dll

F

950.00

Rupiah

G

113,723.42

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

TRUK MIXER (AGITATOR) Pw 220 HP Cp 5.00 M3 A 5.0 Tahun W 2,000.0 Jam B 950,000,000 Rupiah

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

205,260.00

Rupiah

2.

Pelumas

I

192,500.00

Rupiah

J

41,563

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

59,375.00

Rupiah

L M

21,428.57 17,857.14

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

537,983.21

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

651,706.64 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E49

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

117,000,000

2.

Faktor Angsuran Modal

D

0.16275

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

114,247.27

Rupiah

b. Asuransi, dll

F

1,560.00

Rupiah

G

115,807.27

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

BORE PILE MACHINE Pw 125 HP Cp 60.00 CM A 10.0 Tahun W 1,500.0 Jam B 1,170,000,000 Rupiah

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

145,781.25

Rupiah

2.

Pelumas

I

131,250.00

Rupiah

J

68,250

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

136,500.00

Rupiah

L M

21,428.57 17,857.14

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

521,066.96

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

636,874.23 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E50

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

90,000,000

2.

Faktor Angsuran Modal

D

0.26380

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

106,837.98

Rupiah

b. Asuransi, dll

F

900.00

Rupiah

G

107,737.98

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

CRANE ON TRACK 75-100 TON Pw 200 HP Cp 75.00 Ton A 5.0 Tahun W 2,000.0 Jam B 900,000,000 Rupiah

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

186,600.00

Rupiah

2.

Pelumas

I

175,000.00

Rupiah

J

39,375

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

56,250.00

Rupiah

L M

21,428.57 17,857.14

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

496,510.71

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

604,248.69 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E51

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT No.

U RAIAN

KODE

KOEF.

SATUAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

50,000,000

2.

Faktor Angsuran Modal

D

0.16275

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

48,823.62

Rupiah

b. Asuransi, dll

F

666.67

Rupiah

G

49,490.29

Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

BLENDING EQUIPMENT Pw 50 HP Cp 30.00 Ton A 10.0 Tahun W 1,500.0 Jam B 500,000,000 Rupiah

Rupiah -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

58,312.50

Rupiah

2.

Pelumas

I

52,500.00

Rupiah

J

29,167

Rupiah

Biaya bengkel

3.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

0.0000

Rupiah

L M

21,428.57 17,857.14

Rupiah Rupiah

Biaya Operasi per Jam (H+I+K+L+M)

P

179,264.88

Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

T

228,755.17 Rupiah

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

4. 5.

i U1 U2 Mb Ms Mp

10.00 % / Tahun 21,428.57 Rp./Jam 17,857.14 Rp./Jam 8,599.00 Liter 7,775.00 Liter 35,000.00 Liter

KET.

E52

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

URAIAN

KODE

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

BAR BENDER Pw Cp A W B

1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

2.

Faktor Angsuran Modal

D

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod ( B' - C ) x D W'

E

0 Rupiah

b. Asuransi, dll

F

0 Rupiah

G

0 Rupiah

3498.75 Rupiah

A. 1. 2. 3. 4.

B.

0.002 x B' W'

Biaya Pasti per Jam C.

= i x (1 + i)^A' (1 + i)^A' - 1

(E+F)

KOEF.

SATUAN KET.

3 HP 8 Tahun 1,250 Jam 0 Rupiah

0 Rupiah 0.1874440176 -

BIAYA OPERASI PER JAM KERJA 1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

H

2.

Pelumas

I

3150 Rupiah

(6.25% dan 8.75%) x B W

J

0 Rupiah

3.

Perawatan dan (12,5 % - 17,5 %) x B' perbaikan W'

K

0 Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

L M

21428.5714286 Rupiah 0 Rupiah

Biaya Operasi per Jam

P

28077.3214286 Rupiah

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

S

28077.3214286 Rupiah

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

i U1 U2 Mb Ms Mp

10 % / Tahun 21428.5714286 Rp./Jam 17857.1428571 Rp./Jam 8599 Liter 7775 Liter 35000 Liter

Biaya bengkel

D.

E. 1. 2. 3. 4. 5. 6.

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

(H+I+K+L+M)

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

URAIAN

KODE

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

BAR CUTTER Pw Cp A W B

1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

2.

Faktor Angsuran Modal

D

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod ( B' - C ) x D W'

E

0 Rupiah

b. Asuransi, dll

F

0 Rupiah

G

0 Rupiah

3498.75 Rupiah

A. 1. 2. 3. 4.

KOEF.

SATUAN KET.

3 HP 8 Tahun 1,250 Jam 0 Rupiah

5.

B.

0.002 x B' W'

Biaya Pasti per Jam C.

= i x (1 + i)^A' (1 + i)^A' - 1

(E+F)

0 Rupiah 0.1874440176 -

BIAYA OPERASI PER JAM KERJA 1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

H

2.

Pelumas

I

3150 Rupiah

(6.25% dan 8.75%) x B W

J

0 Rupiah

3.

Perawatan dan (12,5 % - 17,5 %) x B' perbaikan W'

K

0 Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

L M

21428.5714286 Rupiah 0 Rupiah

Biaya Operasi per Jam

P

28077.3214286 Rupiah

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

S

28077.3214286 Rupiah

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

i U1 U2 Mb Ms Mp

10 % / Tahun 21428.5714286 Rp./Jam 17857.1428571 Rp./Jam 8599 Liter 7775 Liter 35000 Liter

Biaya bengkel

D.

E. 1. 2. 3. 4. 5. 6.

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

(H+I+K+L+M)

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

URAIAN

KODE

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

BREAKER Pw Cp A W B

1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

2.

Faktor Angsuran Modal

D

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod ( B' - C ) x D W'

A. 1. 2. 3. 4.

B.

C.

= i x (1 + i)^A' (1 + i)^A' - 1

KOEF.

SATUAN KET.

80 HP 3 m3/jam 5 Tahun 2,000 Jam 0 Rupiah 1.8 3 1200 0 0 Rupiah 0.2637974808 -

E

0 Rupiah

b. Asuransi dan Lain-lain 0.002 x B W'

F

0 Rupiah

Biaya Pasti per Jam

G

0 Rupiah

(E+F)

BIAYA OPERASI PER JAM KERJA 1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

H

74640 Rupiah

2.

Pelumas

I

70000 Rupiah

3.

Workshop

= (6,25 % - 8,75 %) x B' W' Sparepart = (12,5 % - 17,5 %) x B' W' Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

J

0 Rupiah

K

0 Rupiah

L M

21428.5714286 Rupiah 17857.1428571 Rupiah

Biaya Operasi per Jam

P

183925.714286 Rupiah

S

183925.714286 Rupiah

i U1 U2 Mb Ms Mp

10 % / Tahun 21428.5714286 Rp./Jam 17857.1428571 Rp./Jam 8599 Liter 7775 Liter 35000 Liter

4. 5. 6.

= (0.0035-0.006 Ltr/HP/Jam) x Pw x Mp

(H+I+J+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

1. 2. 3. 4. 5. 6. 7.

URAIAN ANALISA ALAT

No.

A 1. 2. 3. 4.

B. 1.

URAIAN

KODE

KOEF.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

GROUTING PUMP Pw Cp A W B

SATUAN KETERANGA

100 15 5 2,000 0

HP Ton Tahun Jam Rupiah

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

2.

Faktor Angsuran Modal

D

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

0 Rupiah

b. Asuransi, dll

F

0 Rupiah

G

0.00 Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

0 Rupiah 0.2637974808 -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

93300 Rupiah

2.

Pelumas

I

87500 Rupiah

J

0 Rupiah

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

0 Rupiah

L M

21428.5714286 Rupiah 17857.1428571 Rupiah

Biaya Operasi per Jam

P

220,085.71 Rupiah

Biaya bengkel

3. 4. 5.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi

T

i U1 U2 Mb Ms Mp

220,085.71 Rupiah

10 % / Tahun 21428.5714286 Rp./Jam 17857.1428571 Rp./Jam 8599 Liter 7775 Liter 35000 Liter

Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

A 1. 2. 3. 4.

B. 1.

URAIAN

KODE

KOEF.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

JACK HIDROLIC Pw Cp A W B

SATUAN KETERANGA

3 150 5 2,000 0

HP Ton Tahun Jam Rupiah

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

2.

Faktor Angsuran Modal

D

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

0 Rupiah

b. Asuransi, dll

F

0 Rupiah

G

0.00 Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

0 Rupiah 0.2637974808 -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

2799 Rupiah

2.

Pelumas

I

2625 Rupiah

J

0 Rupiah

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

0 Rupiah

L M

21428.5714286 Rupiah 17857.1428571 Rupiah

Biaya Operasi per Jam

P

44,709.71 Rupiah

Biaya bengkel

3. 4. 5.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi

T

i U1 U2 Mb Ms Mp

44,709.71 Rupiah

10 % / Tahun 21428.5714286 Rp./Jam 17857.1428571 Rp./Jam 8599 Liter 7775 Liter 35000 Liter

Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

A 1. 2. 3. 4.

B. 1.

URAIAN

KODE

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

MESIN LAS Pw Cp A W B

KOEF.

SATUAN KETERANGA

3.0 0.17 3.0 900 0

Hp Ton Tahun Jam Rupiah

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

2.

Faktor Angsuran Modal

D

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

0 Rupiah

b. Asuransi, dll

F

0 Rupiah

G

0.00 Rupiah

3498.75 Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

0 Rupiah 0.4021148036 -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

2.

Pelumas

I

3150 Rupiah

J

0 Rupiah

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

0 Rupiah

L M

21428.5714286 Rupiah 17857.1428571 Rupiah

Biaya Operasi per Jam

P

45,934.46 Rupiah

Biaya bengkel

3. 4. 5.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi

T

i U1 U2 Mb Ms Mp

45,934.46 Rupiah

10 % / Tahun 21428.5714286 Rp./Jam 17857.1428571 Rp./Jam 8599 Liter 7775 Liter 35000 Liter

Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

A 1. 2. 3. 4.

B. 1.

URAIAN

KODE

KOEF.

SATUAN KETERANGA

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

PILE DRIVER LEADER, 75 kw Pw 70 HP Cp 75 kw A 5 Tahun W 9600 Jam B 0 Rupiah

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

2.

Faktor Angsuran Modal

D

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

0 Rupiah

b. Asuransi, dll

F

0 Rupiah

G

0.00 Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

0 Rupiah 0.2637974808 -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

65310 Rupiah

2.

Pelumas

I

61250 Rupiah

J

0 Rupiah

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

0 Rupiah

L M

21428.5714286 Rupiah 17857.1428571 Rupiah

Biaya Operasi per Jam

P

165,845.71 Rupiah

Biaya bengkel

3. 4. 5.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi

T

i U1 U2 Mb Ms Mp

165,845.71 Rupiah

10 % / Tahun 21428.5714286 Rp./Jam 17857.1428571 Rp./Jam 8599 Liter 7775 Liter 35000 Liter

Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

A 1. 2. 3. 4.

B. 1.

URAIAN

KODE

KOEF.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

PILE HAMMER Pw Cp A W B

SATUAN KETERANGA

10 Hp 0 0 3 Tahun 800 Jam 0 Rupiah

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

2.

Faktor Angsuran Modal

D

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

0 Rupiah

b. Asuransi, dll

F

0 Rupiah

G

0.00 Rupiah

11662.5 Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

0 Rupiah 0.4021148036 -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

2.

Pelumas

I

10500 Rupiah

J

0 Rupiah

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

0 Rupiah

L M

21428.5714286 Rupiah 17857.1428571 Rupiah

Biaya Operasi per Jam

P

61,448.21 Rupiah

Biaya bengkel

3. 4. 5.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi

T

i U1 U2 Mb Ms Mp

61,448.21 Rupiah

10 % / Tahun 21428.5714286 Rp./Jam 17857.1428571 Rp./Jam 8599 Liter 7775 Liter 35000 Liter

Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

A 1. 2. 3. 4.

B. 1.

URAIAN

KODE

KOEF.

SATUAN KETERANGA

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

PILE HAMMER, 2,5 Ton Pw 1 HP Cp 2.5 Ton A 5 Tahun W 8000 Jam B 0 Rupiah

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

2.

Faktor Angsuran Modal

D

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

0 Rupiah

b. Asuransi, dll

F

0 Rupiah

G

0.00 Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

0 Rupiah 0.2637974808 -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

933 Rupiah

2.

Pelumas

I

875 Rupiah

J

0 Rupiah

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

0 Rupiah

L M

21428.5714286 Rupiah 17857.1428571 Rupiah

Biaya Operasi per Jam

P

41,093.71 Rupiah

Biaya bengkel

3. 4. 5.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi

T

i U1 U2 Mb Ms Mp

41,093.71 Rupiah

10 % / Tahun 21428.5714286 Rp./Jam 17857.1428571 Rp./Jam 8599 Liter 7775 Liter 35000 Liter

Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

A 1. 2. 3. 4.

B. 1.

URAIAN

KODE

KOEF.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

STRESSING JACK Pw Cp A W B

SATUAN KETERANGA

89 Hp 15 Ton 5 Tahun 1800 Jam 0 Rupiah

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

2.

Faktor Angsuran Modal

D

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

0 Rupiah

b. Asuransi, dll

F

0 Rupiah

G

0.00 Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

0 Rupiah 0.2637974808 -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

83037 Rupiah

2.

Pelumas

I

77875 Rupiah

J

0 Rupiah

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

0 Rupiah

L M

21428.5714286 Rupiah 17857.1428571 Rupiah

Biaya Operasi per Jam

P

200,197.71 Rupiah

Biaya bengkel

3. 4. 5.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi

T

i U1 U2 Mb Ms Mp

200,197.71 Rupiah

10 % / Tahun 21428.5714286 Rp./Jam 17857.1428571 Rp./Jam 8599 Liter 7775 Liter 35000 Liter

Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

A 1. 2. 3. 4.

B. 1.

URAIAN

KODE

KOEF.

SATUAN KETERANGA

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

WELDING MACHINE, 300 A Pw 5 HP Cp A 5 Tahun W 10000 Jam B 0 Rupiah

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

2.

Faktor Angsuran Modal

D

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Mod (B-C)xD W

E

0 Rupiah

b. Asuransi, dll

F

0 Rupiah

G

0.00 Rupiah

0.002 x B W

Biaya Pasti per Jam C.

= i x (1 + i)^A (1 + i)^A - 1

(E+F)

0 Rupiah 0.2637974808 -

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

4665 Rupiah

2.

Pelumas

I

4375 Rupiah

J

0 Rupiah

Perawatan dan (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Opera= ( 1 Orang / Jam ) x U2

K

0 Rupiah

L M

21428.5714286 Rupiah 17857.1428571 Rupiah

Biaya Operasi per Jam

P

48,325.71 Rupiah

Biaya bengkel

3. 4. 5.

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi

T

i U1 U2 Mb Ms Mp

48,325.71 Rupiah

10 % / Tahun 21428.5714286 Rp./Jam 17857.1428571 Rp./Jam 8599 Liter 7775 Liter 35000 Liter

Biaya Pekerjaan

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

KETERANGAN

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

U RAIAN

I 1 2 4

5 6 7 8 9 II 1 2 3 4

6

7

8

9

III 1.a.

: AGREGAT KASAR & HALUS untuk bahan lapis Agregat dan lapis Aspal : PENGADAAN AGREGAT KASAR & HALUS : M3

ASUMSI Bahan dasar Sirtu (material Batu bercampur pasir) diterima di lokasi Alat Pemecah Batu (di Base Camp) Kegiatan dilakukan di dalam lokasi Base Camp Berat Isi Bahan : - Batu / Gravel - Pasir - Batu Pecah Harga Satuan Bahan Dasar : - Batu Kali - Sirtu Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Kapasitas Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Faktor Kehilangan Material

KODE

KOEFISIEN

D1 D2 D3 Rp1 Rp2 Rp3 Rp4 Cp1 Cp2 Fa1 Fa2 Fh

1.04 1.373 1.232 260700 195900 683344.937101 533941.26338 60 1.5 0.70 0.83 1.10

METHODE PELAKSANAAN Wheel Loader mengangkut Sirtu dari tumpukan dan menuangkannya ke Alat Pemecah Batu. Bahan dasar yang digunakan Sirtu (material Batu bercampur kerikil dan pasir) Dilokasi hooper/Feeder dipasang penyiram air (water sprayer) berfungsi sebagai pencucian bahan dari kotoran (lumpur) Setelah disemprot air Sirtu dimasukkan kedalam pemecah pertama (primary crusher) kapasitas 60 ton/jam (bukaan Jaw 10 cm s.d 20 cm tergantung ukuran boulder) Hasil Primary Crusher disaring memakai Scalping Screen(screen 1) dengan ukuran ayakan #1,5 inch (3,75 cm) atau #2,0 inch (5,00 cm) yg menghasilkan lolos ayakan agregat ukuran (0 - 50) dan tdk lolos agg.(50 - 200) Asumsi material yang lolos saringan (screen1) Asumsi keseluruhannya menghasilkan ukuran (0 - 50) Hasil yang lolos saringan(screen1) sebagai fraksi halus tidak boleh dipakai langsung untuk bahan campuran lapisan perkerasan aspal, tetapi dapat digunakan untuk bahan campuran Agregat kelas B dan S, khusus untuk Agregat A yang digunakan hanya ukuran (0 - 5) Hasil yang tidak lolos screen1 dimasukan ke pemecah kedua (Secondary Crusher) kemudian dipisahkan mempergunakan Screen2 yang menghasilkan ukuran (0 - 5), (5 - 3/8"=9,50mm) dan (3/8" - 3/4"=19mm atau 1"=2,54mm)) yang dapat langsung digunakan untuk kebutuhan Agregat Kasar Lapis pondasi Agregat A (ukuran 5 - 1") dan Agg.Kasar dan Agg.Halus lapisan perkerasan Aspal Asumsi proporsi hasil pemisahan saringan (screen2) - menghasilkan ukuran (0 - 5) - menghasilkan ukuran (5 - 3/8"=9,5mm) - menghasilkan ukuran (3/8" - 3/4"=19mm) Hasil yang tidak lolos dimasukan kedalam pemecah ketiga (Tertiary crusher) atau (secondary Crusher) dan hasilnya dimasukan kembali ke saringan screen2 ANALISA ALAT Kerja Stone Crusher memecah gravel : - Waktu kerja Stone Crusher - Produksi Stone Crusher 1 jam

= (Fa1 x Cp1) : D3

25 10.9249817917

75 36.525974026

10 20 70

Tst Qb

1.00 34.09

- Kebutuhan batu/gravel 1 jam 1.b.

1.c.

1.d.

= (Fa1 x Cp1) : D1

Qg

40.38

Kerja Wheel Loader melayani Stone Crusher : - Kap. Angkut / rit = (Fa2 x Cp2) - Waktu Siklus (Muat, Tuang, Tunggu, dll) - Waktu kerja W.Loader memasok gravel = {(Qg : Ka) x Ts} : 60 menit

Ka Ts

1.25 5.00

Tw

2.70

Biaya Produksi Batu Pecah stone crusher 1 set dgn wheel loader = {(Tst x Rp3) + (Tw x Rp4)}

Bp

2,126,652.34

HSb

2,466,364.49

Harga Satuan Batu Pecah Produksi St.Crusher / M3 = {(Qg : Qb) x Fh x Rp1} + Bp

IV 1

2

III.2.

PERHITUNGAN Primary Crusher Produksi Primary Crusher + scalping Screen 1 Lolos scalping screen (sreen1) Tidak lolos scalping screen(screen1) ( 100 - LSc 1 ) Asumsi % Biaya proses scalping screen ukuran # 2"=50 mm thdp biaya produksi Biaya Produksi scalping Screen Volume (0 - 50) = ((Prod x LSc 1) x LSc2))/D1

Prod LSc 1 TLSc1 LSc2 BPSc V1

60 25 75 20 425330.467468 10.9249817917

Secondary Crusher Produksi Secondary Crusher + scalping Screen 2 Asumsi % Biaya proses produksi Batu Pecah thdp BOP S.Crusher 1 set Biaya Produksi = LSc3 : 100 x BP + BPSc : 2 kapasitas yang diproduksi = Prod x TLSc1/100 : D3 Lolos screen2 ukuran ( 0 - 5) Volume ukuran ( 0 - 5) = (CpSC1 x LSc4/100) Lolos screen2 ukuran ( 5 - 9,5) Volume ukuran ( 5 - 9,5) = (CpSC1 x LSc5/100) Lolos screen2 ukuran ( 9.5 - 19,0) Volume ukuran ( 9,5 - 19.0) = (CpSC1 x LSc6/100)

Prod LSc3 Bprod CpSC1 LSc4 V2 LSc5 V3 LSc6 V4

45 80 1913987.10361 36.525974026 10 3.6525974026 20 7.3051948052 70 25.5681818182

HARGA SATUAN AGREGAT Primary Crusher Harga Satuan Agregat Halus+Kasar untuk Lapis Pondasi / M3 dengan asumsi memerlukan biaya setengah biaya proses scalping screen 1, setengah masuk ke screen1, setengahnya lagi masuk ke Secunder Crusher = ((BPSc : 2) : V1) + Rp2 Secondary Crusher Asumsi %Biaya produksi per fraksi (untuk tiap lengan conveyor 1/3 biaya produksi) Biaya Produksi per Fraksi = Hs 1 : 3 Agregat pecah mesin ( 0 - 5) = PF : V2 + Rp2 Agregat pecah mesin (5 - 9.5) = PF : V3 + Rp2 Agregat pecah mesin (9.5 - 19) = PF : V4 + Rp2 Agregat pecah kasar

= PF x 2/(V3 + V4) + Rp2

Hs1

215365.957728

LSc2 PF Hs2 Hs3 Hs4

33.3333333333 822121.497062 420978.596529 308439.298265 228054.085218 245917.465895

URAIAN ANALISA HARGA SATUAN

SATUAN

Ton/M3 Ton/M3 Ton/M3 Rp./M3 Rp./M3 Rp./Jam Rp./Jam Ton/Jam M3 -

KETERANGAN

Berongga Berongga Berongga

Kap. Bucket

% m3

% m3

% % %

Jam M3/Jam

Batu pecah

M3/Jam

M3 menit Jam

Rp./Jam

Rp.

Ton/Jam % % % Rp. m3

Ton/Jam % Rp. m3 % m3 % m3 % m3

Rp

% Rp. Rp./M3 Rp./M3 Rp./M3

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: AGREGAT KELAS A (kondisi lepas) : PENGADAAN AGREGAT KELAS A : M3

No.

I. 1 2 3 4 5 6 7 8 9 10

II. 1 2

U RAIAN

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal lapis agregat padat Berat isi padat Jam kerja efektif per-hari Proporsi Campuran : - Agregat Pecah Kasar - Aggregat Halus Lapis pondasi A Berat Isi Agregat (lepas) Faktor kehilangan - Agregat Pecah Kasar - Aggregat Halus Lapis pondasi A

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN Agregat Pecah Kasar = APK x 1 M3 x Fh1 Aggregat Halus Lapis pond A = PU x 1 M3 x Fh2 ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Waktu pemuatan alat blending

Kap. Prod. / jam = Koefisien Alat / M3 2.b.

KODE KOEFISIEN SATUAN

L t Bip Tk PU Bil Fh1 Fh2

20.00 0.15 1.81 7.00 70.00 30.00 1.51 1.05 1.05

KM M jam % % ton/m3

M92 M44

0.7350 0.3150

M3 M3

(E15) V Fb Fa

1.50 0.85 0.83

M3 -

T1

12.50

menit

Ts1

12.50

menit

Q1

5.08

M3

(E15)

0.1969

jam

(E52) V Fa

25.00 0.83

M3/jam

Q2

20.75

M3

0.0482

jam

APK

URUTAN KERJA Wheel Loader memuat material bahan campuran dari stockpile ke alat blending Blending equipment melakukan pencampuran (blending) proses pembuatan agregat kelas A

III.

2. 2.a.

URAIAN ANALISA HARGA SATU

V x Fb x Fa x 60 Ts1 = 1 : Q1

BLENDING EQIPMENT Kapasitas Faktor effesiensi alat Kap. Prod. / jam = Koefisien Alat / M3

V x Fa = 1 : Q2

3.

TENAGA Produksi menentukan : WHEEL LOADER Produksi Agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / M3 : - Pekerja = (Tk x P) : Qt - Mandor = (Tk x M) : Qt

Q1 Qt

5.08 35.56

M3/Jam M3

P M

4.00 1.00

orang orang

(L01) (L03)

0.7875 0.1969

Jam Jam

RAIAN ANALISA HARGA SATUAN

KETERANGAN

memenuhi Spec.

(lepas) kondisi sedang

jarak 50 meter

padat

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : AGREGAT KELAS A (kondisi lepas) : PENGADAAN AGREGAT KELAS A : M3

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

jam jam

0.7875 0.1969

: : :

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1 2

Agregat Pecah Kasar Agg. Halus Lapis Pondasi A

M3 M3

0.7350 337983.913239885 0.3150 337983.913239885

JUMLAH HARGA BAHAN C. 1. 2. 3

PERALATAN Wheel Loader Blending Equpment Alat Bantu

(E15) (E52)

jam jam Ls

0.1969 0.0482 1.0000

533,941.26 228,755.17 0.00

JUMLAH HARGA PERALATAN D.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

JUMLAH HARGA (Rp.)

TUAN

JUMLAH HARGA (Rp.)

11,249.48 3,374.84

14,624.32

0.00 248,418.18 106,464.93

354,883.11

105,114.82 11,024.35 0.00

116,139.17 485,646.60

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I 1 2 3 4 5 6 8 9

II

: AGREGAT KELAS B (kondisi lepas) : PENGADAAN AGREGAT KELAS B : M3

U RAIAN

KODE

ASUMSI Bahan Agregat Halus & Kasar diterima di lokasi Base Camp Jarak dari stockpile ke alat blending Jam kerja effektif perhari Kegiatan dilakukan di dalam lokasi Base Camp Berat isi padat Jam kerja efektif per-hari Proporsi Campuran : Fraksi lolos Scalping Screen 0 - 50 mm Fraksi lolos Scalping Screen 0 - 50 mm Berat volume agregat (lepas) - Agregat Pecah Mesin 20 - 30 mm - Agregat Pecah Mesin 5 - 10 & 10 - 20 Fraksi lolos Scalping Screen 0 - 50 mm

l Tk Bip Tk 20-30 St Bil Fh1 Fh2 Fh3

URUTAN PEKERJAAN 1 2

III. 1.

2. 2.a.

Wheel Loader memuat material bahan campuran dari stockpile ke alat blending Blending equipment melakukan pencampuran (blending) Aggregat kasar, aggregat halus dan pasir alam menjadi Aggregat B PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agregat Pecah Kasar Fraksi lolos Scalping Screen 0 - 50 mm

= "20-30" x 1 M3 x Fh1 = St x 1 M3 x Fh3

ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Waktu pemuatan alat belending

M93 M16

(E15) V Fb Fa T1 Ts1

Kap. Prod. / jam = Koefisien Alat / M3 2.b.

V x Fb x Fa x 60 (Bip/Bil) x Ts1 = 1 : Q1

BLENDING EQUIPMENT Kapasitas Faktor effesiensi alat

(E15) (E52) V Fa

Kap. Prod. / jam = Koefisien Alat / M3

Q1

V x Fa = 1 : Q2

Q2

3.

TENAGA Produksi menentukan : WHEEL LOADER Produksi Agregat / hari = Tk x Q1 Kebutuhan tenaga :

Q1 Qt - Pekerja - Mandor

Koefisien tenaga / M3

P M

: - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

(L01) (L03)

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I 1 2 3 4 5 6 8

9

II 1 2

III. 1.

2. 2.a.

: AGREGAT KELAS S : PENGADAAN AGREGAT KELAS S : M3

U RAIAN

ASUMSI Bahan Agregat Halus & Kasar diterima di lokasi Base Camp Jarak dari stockpile ke alat blending Jam kerja effektif perhari Kegiatan dilakukan di dalam lokasi Base Camp Berat isi padat Jam kerja efektif per-hari Proporsi Campuran : Agregat Pecah Kasar Agregat Lolos # 1 " - Fraksi lolos Scalping 0 - 37,5 mm Screen 0 - 37,5 mm Berat volume agregat (lepas) Agregat Pecah Kasar Agregat Lolos # 1 " - Fraksi lolos Scalping 0 - 37,5 mm Screen 0 - 37,5 mm URUTAN PEKERJAAN

KODE

l Tk Bip Tk 20-30 5-10&10-20

St Bil Fh1 Fh2 Fh3

Wheel Loader memuat material bahan campuran dari stockpile ke alat blending Blending equipment melakukan pencampuran (blending) Aggregat kasar, aggregat halus dan pasir alam menjadi Aggregat B PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agregat Pecah Kasar Agregat Lolos # 1 " - Fraksi lolos Scalping 0 - 37,5 mm Screen 0 - 37,5 mm ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Waktu pemuatan alat belending

= "20-30" x 1 M3 x Fh1 = "5-10 & 10-20" x 1 M3 x Fh2 = St x 1 M3 x Fh3

M93 M92 M16

(E15) V Fb Fa T1 Ts1

Kap. Prod. / jam = Koefisien Alat / M3 2.b.

BLENDING EQUIPMENT Kapasitas

V x Fb x Fa x 60 (Bip/Bil) x Ts1 = 1 : Q1

Q1 (E15) (E52) V

Faktor effesiensi alat

Fa

Kap. Prod. / jam =

V x Fa

Koefisien Alat / M3 3.

= 1 : Q2

TENAGA Produksi menentukan : WHEEL LOADER Produksi Agregat / hari = Tk x Q1 Kebutuhan tenaga :

Q1 Qt - Pekerja - Mandor

Koefisien tenaga / M3

Q2

P M

: - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

(L01) (L03)

URAIAN ANALISA HARGA SATUAN

KOEFISIEN SATUAN KETERANGAN

50.00 7.00 1.81 7.00 39.6 60.4 1.51 1.05 1.05 1.05

M jam

jam % % ton/m3

Gradasi harus memenuhi Spesifikasi

0.4158 0.6342

M3 M3

1.50 0.85 0.83

M3 -

(lepas) kondisi sedang

6.00

menit

jarak 50 meter

6.00

menit

10.58

M3

0.0945

jam

25.00 0.83

M3/jam

20.75

M3

0.0482

jam

padat

10.58 74.08

M3/Jam M3

2.00 1.00

orang orang

0.1890 0.0945

Jam Jam

URAIAN ANALISA HARGA SATUAN

KOEFISIEN SATUAN KETERANGAN

50.00 7.00

M jam

1.81 7.00 18 18.3 63.7

jam % % %

1.51 1.05 1.05 1.05

Gradasi harus memenuhi Spesifikasi

ton/m3

0.1890 0.1922 0.6689

M3 M3 M3

1.50 0.85 0.83

M3 -

(lepas) kondisi sedang

2.00

menit

jarak 50 meter

2.00

menit

31.75

M3

0.0315

jam

25.00

M3/jam

padat

0.83 20.75

M3

0.0482

jam

31.75 222.23

M3/Jam M3

2.00 1.00

0.0630 0.0315

orang orang

Jam Jam

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : AGREGAT KELAS B (kondisi lepas) : PENGADAAN AGREGAT KELAS B : M3

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

jam jam

0.1890 0.0945

: : :

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3

Agregat Pecah Kasar Fraksi lolos Scalping S

M93 M16

M3 M3

0.4158 337983.913239885 0.6342 337983.913239885

JUMLAH HARGA BAHAN C. 1. 2. 3

PERALATAN Wheel Loader Blending Equpment Alat Bantu

(E15) (E52)

jam jam Ls

0.0945 0.0482 1.0000

533,941.26 228,755.17 0.00

JUMLAH HARGA PERALATAN D.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

JUMLAH HARGA (Rp.)

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : AGREGAT KELAS S : PENGADAAN AGREGAT KELAS S : M3

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

jam jam

0.0630 0.0315

: : :

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3

Agregat Pecah Kasar Agregat Lolos # 1 " - Fraksi lolos Scalping 0 - 37,5 m Screen 0 - 37,5 mm

M3 M3 M3

0.1890 337983.913239885 0.1922 308439.298264516 0.6689 337983.913239885

JUMLAH HARGA BAHAN C. 1. 2. 3

PERALATAN Wheel Loader Blending Equpment Alat Bantu

(E15) (E52)

jam jam Ls

0.0315 0.0482 1.0000

533,941.26 228,755.17 0.00

JUMLAH HARGA PERALATAN D.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

JUMLAH HARGA (Rp.)

UAN

JUMLAH HARGA (Rp.)

2,699.88 1,619.93

4,319.80

140,533.71 214,349.40

354,883.11

50,455.12 11,024.35 0.00

61,479.46 420,682.37

UAN

JUMLAH HARGA (Rp.)

899.96 539.98

1,439.93

63,878.96 59,266.61 226,060.54

349,206.11

16,818.37 11,024.35 0.00

27,842.72 378,488.76

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I 1 2 3

: AGREGAT KELAS C : PENGADAAN AGREGAT KELAS C : M3

U RAIAN

ASUMSI Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi Base Camp Kegiatan dilakukan di dalam lokasi Base Camp Proporsi campuran : - Agregat Kasar - Pasir

4

Harga Satuan :

5 6 7

Biaya Operasi Alat : - Wheel Loader Faktor Efisiensi Alat : - Wheel Loader Kapasitas Alat : - Wheel Loader

II

- Agregat Kasar - Pasir

URAIAN ANALISA HARGA SATUAN

KODE KOEFISIEN SATUAN

Ak Ps

32.50 67.50

% %

HSAk HSPs

308,439.30 205,000.00

Rp./M3 Rp./M3

Rp1 Fa1 Cp2

533,941.26 0.83 1.50

Rp./Jam M3

METHODE PELAKSANAAN 1

III.1

Wheel Loader melakukan pencampuran (blending) Agregat Kasar, Pasir & Tanah menjadi Agregat Kelas C.

PROSES PENCAMPURAN AGREGAT KELAS C Untuk setiap 1 M3 Agregat Kelas C, diperlukan :

1.a.

1.b. III.2

- Agregat Kasar = Ak x 1 M3 - Pasir = Ps x 1 M3 - Tanah = Tn x 1 M3 - Total volume agregat = Vk + Vp + Vt Waktu pencampuran (blending) oleh Blending Equipmen

Vk Vp Vt Va

0.325 0.675 0.000 1.000

M3 M3 M3 M3

Tc

0.083

Jam/M3

HARGA SATUAN BAHAN AGREGAT KELAS C

2.a.

Agregat Kasar

= Vk x HSAk

Hs1

66,625.00

Rupiah

2.b.

Pasir

= Vh x HSPs

Hs2

208,196.53

Rupiah

2.c.

Tanah

= Vs x HSTn

Hs3

0.00

Rupiah

2.d.

Biaya Pencampuran

= Tc x Rp1

Hs4

44,495.11

Rupiah

2.e.

Harga Satuan Agregat Kelas C / M3 = Hs1 + Hs2 + Hs3 + Hs4

319,316.63

Rupiah

HSAB

AIAN ANALISA HARGA SATUAN

KETERANGAN

Kap. Bucket

Di luar PPN

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: LAPIS PONDASI AGREGAT (kondisi lepas) : PENGADAAN LAPIS PONDASI AGREGAT (CBR 60%) : M3

No.

I.

U RAIAN

1 2 3 4 5 6 7

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal lapis agregat padat Berat isi padat Jam kerja efektif per-hari

8

Proporsi Campuran :

9 10

II. 1 2

Agregat Pecah Kasar

Agregat Lolos # 1 " Fraksi lolos Scalping 0 - 37,5 mm Berat Isi Agregat (lepas) Faktor kehilangan Agregat Pecah Kasar Agregat Lolos # 1 " Fraksi lolos Scalping 0 - 37,5 mm

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN Agregat Pecah Kasar = "20-30" x 1 M3 x Fh1 Agregat Lolos # 1 " = "5-10 & 10-20" x 1 M3 x Fh2 Fraksi lolos Scalping 0 = St x 1 M3 x Fh3 ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Waktu pemuatan alat blending

Kap. Prod. / jam = Koefisien Alat / M3 2.b.

L t Bip Tk A20-30

KOEFISIEN SATUAN

8.73 0.20 1.81 7.00

KM M jam

24.00

%

St Bil Fh1 Fh2 Fh3

21.24 54.76 1.51 1.05 1.05 1.05

% % ton/m3

M93 M92 M16

0.2520 0.2230 0.5750

M3 M3 M3

(E15) V Fb Fa

1.50 0.85 0.83

M3 -

T1

2.00

menit

Ts1

2.00

menit

Q1

31.75

M3

(E15)

0.0315

jam

(E52) V Fa

25.00 0.83

M3/jam

A5-10&10-20

URUTAN KERJA Wheel Loader memuat material bahan campuran dari stockpile ke alat blending Blending equipment melakukan pencampuran (blending) Aggregat 20-30, 10-20, 5-10 dan Sirtu menjadi Lapis Pondasi Agregat (CBR 60%)

III.

2. 2.a.

KODE

URAIAN ANALISA HAR

V x Fb x Fa x 60 Ts1 = 1 : Q1

BLENDING EQIPMENT Kapasitas Faktor effesiensi alat

Kap. Prod. / jam = Koefisien Alat / M3 3.

V x Fa = 1 : Q2

TENAGA Produksi menentukan : WHEEL LOADER Produksi Agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / M3

Q2

: - Pekerja = (Tk x P) : Qt - Mandor = (Tk x M) : Qt

Q1 Qt P M

(L01) (L03)

20.75

M3

0.0482

jam

31.75 M3/Jam 222.23 M3 2.00 1.00

0.0630 0.0315

orang orang

Jam Jam

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I.

: LAPIS PERMUKAAN AGREGAT (kondisi lepas) : PENGADAAN LAPIS PERMUKAAN AGREGAT (CBR 60%) : M3

U RAIAN

1 2 3 4 5 6 7

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal lapis agregat padat Berat isi padat Jam kerja efektif per-hari

8

Proporsi Campuran :

9 10

II. 1 2

- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm - Pasir Urug Berat Isi Agregat (lepas) Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm - Pasir Urug

L t Bip Tk

KOEFISIEN SATUAN

8.73 0.10 1.81 7.00

KM M jam

PU Bil Fh1 Fh2

45.60 54.40 1.51 1.05 1.05

% % ton/m3

M92 M44

0.4788 0.5712

M3 M3

(E15) V Fb Fa

1.50 0.85 0.83

M3 -

T1

2.00

menit

Ts1

2.00

menit

Q1

31.75

M3

(E15)

0.0315

jam

5-10&10-20

URUTAN KERJA Wheel Loader memuat material bahan campuran dari stockpile ke alat blending Blending equipment melakukan pencampuran (blending) Aggregat 10-20, 5-10 dan Pasir Urug menjadi Lapis Permukaan Agregat (CBR 60%)

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN - Agr 5 - 10 & 10 - 20 = "5-10 & 10-20" x 1 M3 x Fh2 - Pasir Urug = PU x 1 M3 x Fh3

2. 2.a.

KODE

URAIAN ANALISA HAR

ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Waktu pemuatan alat blending

Kap. Prod. / jam = Koefisien Alat / M3

V x Fb x Fa x 60 Ts1 = 1 : Q1

2.b.

BLENDING EQIPMENT Kapasitas Faktor effesiensi alat Kap. Prod. / jam = Koefisien Alat / M3

3.

V x Fa

25.00 0.83

M3/jam

Q2

20.75

M3

0.0482

jam

= 1 : Q2

TENAGA Produksi menentukan : WHEEL LOADER Produksi Agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / M3

(E52) V Fa

: - Pekerja = (Tk x P) : Qt - Mandor = (Tk x M) : Qt

Q1 Qt P M

(L01) (L03)

31.75 M3/Jam 222.23 M3 2.00 1.00

0.0630 0.0315

orang orang

Jam Jam

URAIAN ANALISA HARGA SATUAN

KETERANGAN

Gradasi harus memenuhi Spec.

(lepas) kondisi sedang

jarak 50 meter

padat

URAIAN ANALISA HARGA SATUAN

KETERANGAN

Gradasi harus memenuhi Spec.

(lepas) kondisi sedang

jarak 50 meter

padat

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : ………………………………………………………………….. : ……………………………………………… : LAPIS PONDASI AGREGAT (kondisi lepas) : PENGADAAN LAPIS PONDASI AGREGAT (CBR 60%) : M3

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

PERKIRAAN

HARGA

JUMLAH

SATUAN KUANTITAS

SATUAN (Rp.)

HARGA (Rp.)

jam jam

0.0630 0.0315

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3

Agregat Pecah Kasar Agregat Lolos # 1 " Fraksi lolos Scalping 0 - 37,5 mm

M3 M3 M3

0.2520 0.2230 0.5750

337,983.91 308,439.30 228,054.09

JUMLAH HARGA BAHAN C. 1. 2. 3

PERALATAN Wheel Loader Blending Equpment Alat Bantu

(E15) (E52)

jam jam Ls

0.0315 0.0482 1.0000

533,941.26 228,755.17 0.00

JUMLAH HARGA PERALATAN D.

: : :

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

899.96 539.98

1,439.93

85,171.95 68,788.13 131,126.54

285,086.62

16,818.37 11,024.35 0.00

27,842.72 314,369.27

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : ………………………………………………………………….. : ……………………………………………… : LAPIS PERMUKAAN AGREGAT (kondisi lepas) : PENGADAAN LAPIS PERMUKAAN AGREGAT (CBR 60%) : M3

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

jam jam

0.0630 0.0315

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Agregat 5-10 & 10-20 Pasir Urug

(M92) (M44)

M3 M3

0.4788 0.5712

337,983.91 205,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3

PERALATAN Wheel Loader Blending Equpment Alat Bantu

(E15) (E52)

jam jam Ls

0.0315 0.0482 1.0000

533,941.26 228,755.17 0.00

JUMLAH HARGA PERALATAN D.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

: : :

JUMLAH HARGA (Rp.)

899.96 539.98

1,439.93

161,826.70 117,096.00

278,922.70

16,818.37 11,024.35 0.00

27,842.72 308,205.35

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 1.21. : Manajemen Mutu : Lump Sum

No.

URAIAN

A. 1 2 3 4

B. 1 2 3 4

C.

D

SATUAN

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

DATA DAN ASUMSI Tidak ada pengadaan peralatan pengujian mutu dan perlengkapan perangkat alat tulis dan kantor Hanya Jasa Pengendalian Mutu Pekerjaan dilapangan selama masa pelaksanaan pekerjaan Personil melakukan pengendalian mutu berdasarkan spesifikasi pekerjaan dan membuat laporan mutu pekerjaan Manajemen Mutu sesuai ketentuan Ditjen Bina Marga

URUTAN KERJA Penyedia setelah menerima SPMK mengusulkan personil Tenaga Ahli Mutu Pekerjaan sbg Manajer Kendali Mutu Tenaga Ahli dibantu oleh Asisten Kendali Mutu yang berpengalaman dibidangnya dan tenaga pendukung Membuat RMK dan laporan mutu yg disetujui PPK Melakukan pengendalian mutu semua pekerjaan dan membuat laporan secara berkala

TENAGA / PERSONIL

1

Masa Pelaksanaan Pekerjaan Ahli Kendali Mutu

Bulan OB

12.00 12.00

11,000,000.00

2

Asisten Ahli Kendali Mutu

OB

12.00

6,000,000.00

3

Staff Pendukung (supporting Staff)

OB

12.00

2,000,000.00

4

Laporan Kendali Mutu

Bulan

12.00

300,000.00

TOTAL BIAYA PENGENDALIAN MUTU

Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN), Asuransi Tenaga Kerja dan pengeluaran lainnya. 2. Biaya tersebut sudah termasuk biaya pembuatan laporan yang terkait dengan mutu pekerjaan 3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang diperlukan pembuatan laporan mutu seperti komputer, printer, kertas dan sebagainya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 1.8. : Manajemen dan Keselamatan Lalu Lintas : Lump Sum

No.

URAIAN

A. 1 2 3 4 5

B. 1 2 3 4 5

DATA DAN ASUMSI Panjang Lokasi Pekerjaan Total Masa Pelaksanaan Kegiatan Masa Mobilisasi Periode Pekerjaan Perkerasan Jalan Panjang zona kerja Perkerasan Jalan

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

KM Bulan Bulan Bulan M

5.00 8.00 2.00 6.00 400.00

Buah M' Buah Buah Buah Buah Buah Buah M' M2 Set Ls

2.00 400.00 4.00 8.00 12.00 4.00 8.00 8.00 400.00 300.00 2.00 1.00

125,000.00 125,000.00 345,000.00 95,000.00 75,000.00 450,000.00 140,000.00 140,000.00 12,000.00 9,000.00 1,500,000.00 0.00

URUTAN KERJA Penyedia menyiapkan perlengkapan keselamatan jalan selama periode konstruksi sesuai ketentuan Buat rencana kerja manajemen lalu-lintas sesuai schedule pekerjaan dan koordinasikan dengan seluruh personil yang terkait Kelompok kerja pengatur lalu-lintas selama konstruksi menggunakan tenaga pengatur dan flagman dengan 3 shift Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait Semua rambu harus jelas dan terbaca oleh Pengguna Jalan

C. 1 2 3 4 5 6 7 8 9 10 11 12

PERALATAN KESELAMATAN LALU LINTAS Rambu panah berkedip Rambu suar berkedip portabel Rambu tetap informasi pengalihan/pengaturan lalu lintas Rambu portabel informasi pengalihan/pengaturan lalu lintas Rambu penghalang lalu-lintas jenis plastik Rambu penghalang lalu-lintas jenis beton Rambu Peringatan Rambu Petunjuk Pagar jaring pengaman termasuk perlengkapannya Marka jalan sementara (jika diperlukan) Peralatan komunikasi dan Lainnya Alat Bantu

D.

TENAGA / PERSONIL

E

SATUAN

1

Pekerja (Flagman)

OB

36.00

2,000,000.00

2

Koordinator / Pengatur

OB

12.00

3,000,000.00

TOTAL BIAYA MANAJEMEN DAN KESELAMATAN LALU LINTAS

Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN), Asuransi Tenaga Kerja dan pengeluaran lainnya. 2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas 3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang diperlukan seperti material habis pakai baterai, lampu dan sebagainya

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 1.20.(1) : Pengeboran, termasuk SPT dan Laporan : M'

URAIAN

A. 1 2

3

B.

4

1 2 2 3 4 5 6 7

PERALATAN DAN PELAKSANAAN PENGEBORAN Estimasi kedalaman boring per titik Peralatan Pengeboran lengkap Mobilisasi dan Demobilisasi Peralatan Pengeboran lengkap Pelaksanaan Pekerjaan Pengeboran dilapangan Pengambilan SPT interval 2 meter Pengambilan benda uji tanah interval 2 meter Pengujian Laboratorium untuk benda uji lengkap Laporan hasil pengeboran dan pengujian Alat Bantu

1 2 3

TENAGA/PERSONIL Estimasi kedalaman boring per titik Tenaga Ahli Pengeboran Tenaga Pendukung Mobilisasi dan Demobilisasi Tenaga

2

3

C.

D.

HARGA SATUAN (Rp.)

DATA DAN ASUMSI Pengeboran untuk penyelidikan tanah dilokasi kegiatan termasuk pembuatan laporan hasil penyelidikan Jasa pengeboran termasuk sewa peralatan yg digunakan, personil yang melakukan pengeboran, biaya pengujian laboratorium dan pembuatan laporan Penentuan lokasi pengeboran harus seijin direksi

URUTAN KERJA Penyedia memobilisasi peralatan pengeboran kelokasi yang telah disetujui oleh PPK Pengeboran dilakukan dengan mengambil SPT dan sampel tanah terganggu (Disturb) dengan interval mak.2 meter atau setiap ada perubahan strata tanah Benda uji diambil dan dilakukan pengujian laboratorium Pengeboran dilakukan hingga mencapai tanah keras atau SPT hingga nilai >40 Dibuat laporan hasil pengujian

1

SATUAN

PERKIRAAN KUANTITAS

M Unit Ls M Sampel Sampel Sampel Ls Ls

24.00 1.00 1.00 24.00 12.00 12.00 12.00 1.00 1.00

2,000,000.00 1,000,000.00 125,000.00 75,000.00 75,000.00 200,000.00 500,000.00 0.00

M OH OH Ls

24.00 3.00 5.00 1.00

200,000.00 100,000.00 1,500,000.00

E TOTAL BIAYA PENGEBORAN TERMASUK LAPORAN F OVERHEAD & PROFIT ( 10% x E) G TOTAL HARGA PEKERJAAN ( E + F ) H HARGA SATUAN PENGEBORAN DAN LAPORAN PER METER Catatan : 1. Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba

serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya. 2. Biaya tersebut sudah termasuk biaya peralatan pengeboran, pengujian laboratorium dan pelaporan hasil pengeboran serta tenaga pengeboran 3. Biaya satuan tersebut sudah termasuk kebutuhan material pendukung dan peralatan yang diperlukan termasuk bahan bakar, bahan habis dipakai dan operator.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 1.20.(2) : Sondir, termasuk Laporan : M'

URAIAN

A. 1 2 3

B.

3

1 2 2 3 4 5

PERALATAN DAN PELAKSANAAN PENGEBORAN Estimasi kedalaman sondir per titik Peralatan Sondir lengkap Mobilisasi dan Demobilisasi Peralatan Sondir lengkap Pelaksanaan Pekerjaan Sondir dilapangan Pengambilan Tahanan Ujung interval 0,20 m Laporan hasil sondir Alat Bantu

1 2 3

TENAGA/PERSONIL Estimasi kedalaman boring per titik Tenaga Ahli Sondir Tenaga Pendukung Mobilisasi dan Demobilisasi Tenaga

2

C.

D.

HARGA SATUAN (Rp.)

DATA DAN ASUMSI Pekerjaan sondir untuk penyelidikan tanah dilokasi kegiatan termasuk pembuatan laporan hasil sondir Jasa pekerjaan sondir termasuk sewa peralatan yg digunakan, personil yang melakukan sondir dan pembuatan laporan Penentuan lokasi sondir harus seijin direksi

URUTAN KERJA Penyedia memobilisasi peralatan sondir kelokasi yang telah disetujui oleh PPK Sondir dilakukan untuk mengukur tahanan ujung dan hambatan akibat gesekan dengan interval 0,20m sampai tahanan ujung mak.sebesar 250 Kg/Cm2 Dibuat laporan hasil pengujian

1

SATUAN

PERKIRAAN KUANTITAS

M Unit Ls M Sampel Ls Ls

24.00 1.00 1.00 24.00 120.00 1.00 1.00

1,200,000.00 500,000.00 125,000.00 1,500.00 250,000.00 0.00

M OH OH Ls

24.00 1.00 4.00 1.00

200,000.00 100,000.00 500,000.00

E TOTAL BIAYA SONDIR TERMASUK LAPORAN F OVERHEAD & PROFIT ( 10% x E) G TOTAL HARGA PEKERJAAN ( E + F ) H HARGA SATUAN SONDIR DAN LAPORAN PER METER Catatan : 1. Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya. 2. Biaya tersebut sudah termasuk biaya peralatan pengeboran, pengujian laboratorium dan pelaporan hasil pengeboran serta tenaga pengeboran 3. Biaya satuan tersebut sudah termasuk kebutuhan material pendukung dan peralatan yang

diperlukan termasuk bahan bakar, bahan habis dipakai dan operator.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

URAIAN

A. 1 2 3

B. 1 2 3 4

C. 1

2

3

D

D

: 1.17 : Pengamanan Lingkungan : Lump Sum

DATA DAN ASUMSI Kegiatan yang dilakukan, pengukuran baku mutu air tanah dan air permukaan, baku mutu udara dan kebisingan Pengambilan sampel Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

SATUAN

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

Titik

3.00

PENGUJIAN PARAMETER KUALITAS LINGKUNGAN Uji Udara Emisi dan Ambien, parameter yang diambil meliputi - NOX Metode Phenol Disulonic Acid (PDS) - Sulfurdioksida (SOX) Metode Turbidimetrik - Karbondioksida (CO2) Metode Infra Merah - Hidro Carbon (HC)-CH4 Metode Gas Chromatography-Flame Ionized Detector - Particulate Matter10 (PM10) - Timah Hitam (Pb) Metode SSA

sampel sampel sampel sampel sampel sampel

4.00 4.00 4.00 4.00 4.00 4.00

197,000.00 210,000.00 250,000.00 230,000.00 213,000.00 192,000.00

Pengukuran Kebisingan , parameter yang diambil meliputi : - Vibrasi lingkungan untuk kenyamanan dan kesehatan - Emisi bising kendaraan bermotor secara statis

sampel sampel

4.00 4.00

480,000.00 750,000.00

Pengukuran Kualitas Air, parameter yang diambil meliputi : - pH Metode Elektrometik - Oksigen Terlarut (DO) Metode Winkler - Zat Padat Terlarut (TDS) Metode Gravimetrik - Zat Padat Tersuspensi (TSS) Metode Gravimetrik - Biological Oxygen Demand (BOD) Metode Inkubasi-Winkler - Chemical Oxygen Demand (COD) Metode Spektrofotometrik - Coliform Metode Petrifilm - E. Coli Metode Most Probably Number - Destruksi Pb, Cu, Cd, Zn, Mn, Ag, Co, Cr tot, Fe, Ni - Temperatur (Suhu) Metode Termometrik

sampel sampel sampel sampel sampel sampel sampel sampel sampel sampel

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00

10,000.00 40,000.00 55,000.00 55,000.00 150,000.00 80,000.00 200,000.00 128,000.00 90,000.00 10,000.00

URUTAN KERJA Penyedia menyiapkan perlengkapan pengujian lingkungan (air, udara dan kebisingan) Buat rencana kerja pengujian lingkungan sesuai schedule pekerjaan dan koordinasikan dengan seluruh personil yang terkait Pemilihan lokasi pengujian Melaksanakan pengujian

Biaya Operasional Biaya peralatan Personil Transportasi TOTAL BIAYA PENGAMANAN LINGKUNGAN

Ls Ls Ls

Catatan :

Analisa El - 121

JUMLAH HARGA (Rp.)

132,000,000.00 72,000,000.00 24,000,000.00 3,600,000.00

231,600,000.00

Analisa El - 18

JUMLAH HARGA (Rp.)

250,000.00 50,000,000.00 1,380,000.00 760,000.00 900,000.00 1,800,000.00 1,120,000.00 1,120,000.00 4,800,000.00 2,700,000.00 3,000,000.00 -

72,000,000.00 36,000,000.00

175,830,000.00

Analisa El - 1201

JUMLAH HARGA (Rp.)

2,000,000.00 1,000,000.00 3,000,000.00 900,000.00 900,000.00 2,400,000.00 500,000.00 -

600,000.00 500,000.00 1,500,000.00

13,300,000.00 1,330,000.00 14,630,000.00 609,583.33

Analisa El - 1202

JUMLAH HARGA (Rp.)

1,200,000.00 500,000.00 3,000,000.00 180,000.00 250,000.00 -

200,000.00 400,000.00 500,000.00

6,230,000.00 623,000.00 6,853,000.00 285,541.67

Analisa El - 117

JUMLAH HARGA (Rp.)

15,504,000.00 788,000.00 840,000.00 1,000,000.00 920,000.00 852,000.00 768,000.00 14,760,000.00 1,920,000.00 3,000,000.00 9,816,000.00 40,000.00 160,000.00 220,000.00 220,000.00 600,000.00 320,000.00 800,000.00 512,000.00 360,000.00 40,000.00

40,080,000.00

Analisa E FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 2.1.(1) PERKIRAAN VOL. PEK. : Galian untuk Selokan Drainase dan Saluran Air TOTAL HARGA (Rp.) : M3 0 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

jam jam

PERKIRAAN KUANTITAS

0.0302 0.0076

HARGA SATUAN (Rp.)

: : :

JUM HA (R

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Excavator Dump Truck Alat Bantu

(E10) (E08)

jam jam Ls

0.0076 0.2439 1.0000

563,192.52 287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa E FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 2.2.(1) PERKIRAAN VOL. PEK. : Pasangan Batu dengan Mortar TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Batu Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

3.6145 1.0843 0.3614

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Batu Semen (PC) Pasir

(M02) (M12) (M01)

M3 zak M3

1.0800 161.0000 0.4829

260,700.00 1,269.98 213,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Conc. Mixer Alat Bantu

(E06)

jam Ls

0.3614 1.0000

175,230.07 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa E FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 2.3.(1) PERKIRAAN VOL. PEK. : Gorong-gorong Pipa Beton Bertulang, diameter TOTAL HARGA (Rp.) : M1 0 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

2.3333 0.9333 0.4667

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4.

Beton K-300 Baja Tulangan Urugan Porus Mat. Pilihan

(M59) (M39a) (EI-241) (M09)

M3 Kg M3 M3

0.1052 11.5681 0.1239 0.8128

2,200,182.74 11,440.00 384,454.85 75,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Tamper Flat Bed Truck Alat Bantu

(E25) (E11)

jam jam Ls

1.0091 0.1874 1.0000

58,600.29 457,552.91 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa E FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 2.3.(2) PERKIRAAN VOL. PEK. : Gorong-gorong Pipa Beton Bertulang, diameteTOTAL HARGA (Rp.) : M1 0 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

4.9000 1.4000 0.7000

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4.

Beton K-300 Baja Tulangan Timbunan Porus Mat. Pilihan

(M59) (M39) (EI-241) (M09)

M3 Kg M3 M3

0.1460 16.0606 0.1449 1.0630

2,200,182.74 11,440.00 384,454.85 75,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Tamper Flat Bed Truck Alat Bantu

(E25) (E11)

Jam Jam Ls

1.3156 0.2811 1.0000

58,600.29 457,552.91 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa E FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 2.3.(3) PERKIRAAN VOL. PEK. : Gorong-gorong Pipa Beton Bertulang, diameter TOTAL HARGA (Rp.) : M1 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

Jam Jam Jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

14.0000 1.7500 1.7500

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4.

Beton K-300 Baja Tulangan Urugan Porus Mat. Pilihan

(M59) (M39) (EI-241) (M09)

M3 Kg M3 M3

0.2897 31.8707 0.3103 1.9114

2,200,182.74 11,440.00 384,454.85 75,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Tamper Flat Bed Truck Alat Bantu

(E25) (E11)

Jam Jam Ls

2.3776 0.7028 1.0000

58,600.29 457,552.91 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa E FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 2.3.(4) PERKIRAAN VOL. PEK. : Gorong-gorong Pipa Beton Bertulang, diameter TOTAL HARGA (Rp.) : M1 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

Jam Jam Jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

14.0000 1.7500 1.7500

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4.

Beton K-300 Baja Tulangan Urugan Porus Mat. Pilihan

(M59) (M39) (EI-241) (M09)

M3 Kg M3 M3

0.4084 44.9248 0.4158 2.3100

2,200,182.74 11,440.00 384,454.85 75,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Tamper Flat Bed Truck Alat Bantu

(E25) (E11)

Jam Jam Ls

2.8833 0.7028 1.0000

58,600.29 457,552.91 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 2.3.(5) PERKIRAAN VOL. PEK. : Gorong2 Pipa Baja Bergelombang TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

Jam Jam Jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

64.6154 5.3846 5.3846

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Pipa Baja Glb. Urugan Porus Mat. Pilihan

(M46) (EI-241) (M09)

Kg M3 M3

1,050.00 8.0351 2.5374

24,504.75 384,454.85 75,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Tamper Alat Bantu

(E25)

Jam Ls

2.3781 1.0000

58,600.29 0.00 ,

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 2.3.(6) PERKIRAAN VOL. PEK. : Gorong-gorong Pipa Beton Tanpa Tulangan dia TOTAL HARGA (Rp.) : 2.3.(6) 0 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

1.7500 0.0000 0.3500

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Beton K-175 Urugan Porus Mat. Pilihan

(EI-716) (EI-241) (M09)

M3 M3 M3

0.0541 0.0662 0.2277

2,023,647.67 384,454.85 75,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3 4

Tamper Tamper Flat Bed Truck Alat Bantu

(E25) (E25) (E11)

jam jam jam Ls

0.0036 0.2743 0.0351 1.0000

58,600.29 58,600.29 457,552.91 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 2.3.(7) PERKIRAAN VOL. PEK. : Gorong-gorong Pipa Beton Tanpa Tulangan dia TOTAL HARGA (Rp.) : M1 0 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

1.7500 0.0000 0.3500

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Beton K-175 Urugan Porus Mat. Pilihan

(EI-716) (EI-241) (M09)

M3 M3 M3

0.0643 0.0714 0.2593

2,023,647.67 384,454.85 75,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3 4

Tamper Tamper Flat Bed Truck Alat Bantu

(E25) (E25) (E11)

jam jam jam Ls

0.0045 0.3124 0.0351 1.0000

58,600.29 58,600.29 457,552.91 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 2.3.(8) PERKIRAAN VOL. PEK. : Gorong-gorong Pipa Beton Tanpa Tulangan dia TOTAL HARGA (Rp.) : M1 0 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

1.7500 0.0000 0.3500

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Beton K-175 Urugan Porus Mat. Pilihan

(EI-716) (EI-241) (M09)

M3 M3 M3

0.0745 0.0767 0.2920

2,023,647.67 384,454.85 75,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3 4

Tamper Tamper Flat Bed Truck Alat Bantu

(E25) (E25) (E11)

jam jam jam Ls

0.0054 0.3518 0.0351 1.0000

58,600.29 58,600.29 457,552.91 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO.

: 2.3.(9)

PERKIRAAN VOL. PEK.

:

JENIS PEKERJAAN

: Saluran berbentuk U Tipe DS 1

TOTAL HARGA (Rp.)

:

SATUAN PEMBAYARAN

: M1

% THD. BIAYA PROYEK

:

NO.

KOMPONEN

SATUAN

PERKIRAAN

HARGA

JUM

KUANTITAS

SATUAN

HA

(Rp.)

(R

A.

TENAGA

1.

Pekerja

(L01)

Jam

4.0161

14,285.71

2.

Tukang

(L02)

Jam

0.8032

17,857.14

3.

Mandor

(L03)

Jam

0.1147

17,142.86

Sub Total Tenaga B.

MATERIAL

1.

Semen

Kg

370.8000

1,269.98

2.

Pasir Beton

M3

0.5250

260,700.00

3.

Aggregat Kasar

M3

0.7425

0.00

5.

Formworks

Ls

0.2000

45,000.00

6

Paku

Kg

1.2000

20,220.00

7

Besi Beton

Kg

45.0000

12,815.00

8

Kawat beton

Kg

0.0250

23,100.00

Sub Total Material C.

PERALATAN

1.

Beton Mixer

(E06)

Jam

0.4016

175,230.07

2.

Water Tanker

(E23)

Jam

0.0558

243,811.40

3.

Concrete Vibrator

(E20)

Jam

0.4016

53,568.78

4.

Alat Bantu

Ls

1.0000

0.00

Sub Total Peralatan D.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E.

OVERHEAD & PROFIT

F.

TOTAL HARGA PEKERJAAN ( D + E )

G.

HARGA SATUAN ( D + E ) Per Meter

Note: 1

15.0 % x D

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan.

2

Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang 3

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: 2.3.(10) : Saluran berbentuk U Tipe DS 2 : M1

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

Jam Jam Jam

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

4.0161 0.8032 0.1147

HARGA SATUAN (Rp.)

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

Sub Total Tenaga B.

MATERIAL

1. 2. 3. 5. 6 7 8

Semen Pasir Beton Aggregat Kasar Formworks Paku Besi Beton Kawat beton

C.

PERALATAN

1. 2. 3. 4.

Beton Mixer Water Tanker Concrete Vibrator Alat Bantu

(E06) (E23) (E20)

Kg M3 M3 Ls Kg Kg Kg

370.8000 0.5250 0.7425 0.2000 1.2000 45.0000 0.0250 Sub Total Material

1,269.98 260,700.00 0.00 45,000.00 20,220.00 12,815.00 23,100.00

Jam Jam Jam Ls

0.4016 0.0558 0.4016 1.0000

175,230.07 243,811.40 53,568.78 0.00

Sub Total Peralatan D. E. F. G. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D TOTAL HARGA PEKERJAAN ( D + E ) HARGA SATUAN ( D + E ) Per Meter SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: 2.3.(11) : Saluran berbentuk U Tipe DS 3 : M1

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

Jam Jam Jam

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

4.0161 0.8032 0.1147

HARGA SATUAN (Rp.)

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

Sub Total Tenaga B.

MATERIAL

1. 2. 3. 5. 6 7 8

Semen Pasir Beton Aggregat Kasar Formworks Paku Besi Beton Kawat beton

C.

PERALATAN

1. 2. 3. 4.

Beton Mixer Water Tanker Concrete Vibrator Alat Bantu

(E06) (E23) (E20)

Kg M3 M3 Ls Kg Kg Kg

370.8000 0.5250 0.7425 0.2000 1.2000 45.0000 0.0250 Sub Total Material

1,269.98 260,700.00 0.00 45,000.00 20,220.00 12,815.00 23,100.00

Jam Jam Jam Ls

0.4016 0.0558 0.4016 1.0000

175,230.07 243,811.40 53,568.78 0.00

Sub Total Peralatan D. E. F. G. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D TOTAL HARGA PEKERJAAN ( D + E ) HARGA SATUAN ( D + E ) Per Meter SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan.

2

3 4

Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI FORMULIR STANDAR UNTUK

PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: 2.3.(12) PERKIRAAN VOL. PEK. : Beton K250 (fc’ 20) untuk struktur drainase TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

Jam Jam Jam

PERKIRAAN KUANTITAS

4.0161 0.8032 0.1147

HARGA SATUAN (Rp.)

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

Sub Total Tenaga B.

MATERIAL

1. 2. 3. 5. 6 7

Semen Pasir Beton Aggregat Kasar Formworks Paku Besi Beton

Kg M3 M3 Ls Kg Kg

370.8000 0.5250 0.7425 0.2000 1.2000 45.0000

1,269.98 260,700.00 0.00 45,000.00 20,220.00 12,815.00

Sub Total Material C.

PERALATAN

1. 2. 3. 4.

Beton Mixer Water Tanker Concrete Vibrator Alat Bantu

(E06) (E23) (E20)

Jam Jam Jam Ls

0.4016 0.0558 0.4016 1.0000

175,230.07 243,811.40 53,568.78 0.00

Sub Total Peralatan D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

0

Analisa LI

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 2.3.(13) PERKIRAAN VOL. PEK. : Baja Tulangan untuk struktur drainase beton minTOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.1050 0.0350 0.0350

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Baja Tulangan (Polos) U32 Kawat Beton

(M57a) (M14)

Kg Kg

1.0500 0.0200

12,815.00 23,100.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 2.3.(14) PERKIRAAN VOL. PEK. : Pasangan Batu tanpa Adukan (Aanstamping) TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

5.2500 1.7500 0.8750

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Batu Belah

(M06)

M3

1.1000

262,400.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 2.4.(1) PERKIRAAN VOL. PEK. : Bahan Porous untuk Bahan Penyaring (Filter) TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

Jam Jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

4.2000 0.7000

: : :

JUM HA (R

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Agregat Kasar Pasir

(M03) (M01)

M3 M3

0.5500 0.5500

337,983.91 213,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Tamper Alat Bantu

(E25)

Jam Ls

0.1606 1.0000

58,600.29 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: SULUT/Kota Manado : 2.4.(2) : Anyaman Filter Plastik : M2

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

Jam Jam Jam

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

1.4000 0.2800 0.2800

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Filter Plastik

(M23)

M2

1.0500

15,000.00

JUMLAH HARGA BAHAN

C. 1.

PERALATAN Alat Bantu

Ls

1.0000

0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI

wah Permukaan FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: SULUT/Kota Manado : 2.4.(3) PERKIRAAN VOL. PEK. : Pipa Berlubang Banyak (Perforated Pipe) untu TOTAL HARGA (Rp.) : M1 % THD. BIAYA PROYEK

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

Jam Jam Jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

1.1667 0.5833 0.5833

: : :

JUM HA (R

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4 5

Pipa Porous Semen (PC) Mortar Pasir Filter Stripe, dll

(M25) (M12) (M01)

M' Kg M3 M3 Ls

1.0500 0.0900 0.0003 0.0002 1.0000

40,000.00 1,587.47 0.00 213,000.00 0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan.

2

3 4

Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-211

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 86,285.46 0.01

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

431.83 129.55

561.39

0.00

4,256.11 70,213.34 0.00

74,469.45 75,030.84 11,254.63 86,285.46

Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-221

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 838,815.58 0.10

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan

51,635.11 19,363.17 6,196.21 77,194.49

281,556.00 204,465.98 102,852.22

588,874.19

63,336.17 0.00

63,336.17 729,404.85 109,410.73 838,815.58

atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-231

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 776,482.37 0.10

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

33,333.33 16,666.67 8,000.00 58,000.00

231,381.81 132,339.40 47,633.96 60,959.25

472,314.42

59,134.76 85,752.89 0.00

144,887.64 675,202.06 101,280.31 776,482.37

Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-232

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 1,096,098.76 0.14

JUMLAH HARGA (Rp.)

70,000.00 25,000.00 12,000.00 107,000.00

321,238.82 183,733.34 55,707.51 79,724.25

640,403.92

77,096.10 128,629.33 0.00

205,725.43 953,129.35 142,969.40 1,096,098.76

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-233

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 2,284,884.85 0.29

JUMLAH HARGA (Rp.)

200,000.00 31,250.00 30,000.00 261,250.00

637,466.39 364,600.49 119,286.73 143,351.44

1,264,705.04

139,328.02 321,573.33 0.00

460,901.35 1,986,856.39 298,028.46 2,284,884.85

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-234

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 2,872,013.36 0.36

JUMLAH HARGA (Rp.)

200,000.00 31,250.00 30,000.00 261,250.00

898,570.13 513,939.43 159,856.33 173,250.00

1,745,615.89

168,963.71 321,573.33 0.00

490,537.03 2,497,402.92 374,610.44 2,872,013.36

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-235

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 34,799,371.42 4.34

JUMLAH HARGA (Rp.)

923,076.92 96,153.85 92,307.69 1,111,538.46

25,729,987.50 3,089,133.20 190,303.81

29,009,424.51

139,360.01 0.00

139,360.01 30,260,322.98

4,539,048.45

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

34,799,371.42

Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-236

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 247,688.19 0.03

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

25,000.00 0.00 6,000.00 31,000.00

109,507.54 25,431.69 17,075.81

152,015.04

212.67 16,074.66 16,078.67 0.00

32,365.99 215,381.03 32,307.15 247,688.19

Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-237

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 279,119.76 0.03

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

25,000.00 0.00 6,000.00 31,000.00

130,169.33 27,450.08 19,446.75

177,066.16

261.42 18,306.59 16,078.67 0.00

34,646.67 242,712.84 36,406.93 279,119.76

Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-238

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 310,746.50 0.04

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

25,000.00 0.00 6,000.00 31,000.00

150,831.13 29,468.46 21,902.06

202,201.66

316.07 20,617.95 16,078.67 0.00

37,012.69 270,214.35 40,532.15 310,746.50

Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa LI - 239

FORMULIR STANDAR UNTUK

ANALISA MASING-MASING HARGA SATUAN

1.00 439,207.00 0.05

JUMLAH HARGA (Rp.)

57,372.35 14,343.09 1,967.05 73,682.49

470,906.73 136,867.50 0.00 9,000.00 24,264.00 576,675.00 577.50 1,218,290.73

70,373.52 13,615.25 21,513.57 0.00

105,502.34 1,397,475.56 139,747.56 1,537,223.11

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan

atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

439,207.00

Analisa LI - 2310

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 512,408.00 0.06

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

57,372.35 14,343.09 1,967.05 73,682.49

470,906.73 136,867.50 0.00 9,000.00 24,264.00 576,675.00 577.50 1,218,290.73

70,373.52 13,615.25 21,513.57 0.00

105,502.34 1,397,475.56 139,747.56 1,537,223.11 512,408.00

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa LI - 2311

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 614,889.00 0.08

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

57,372.35 14,343.09 1,967.05 73,682.49

470,906.73 136,867.50 0.00 9,000.00 24,264.00 576,675.00 577.50 1,218,290.73

70,373.52 13,615.25 21,513.57 0.00

105,502.34 1,397,475.56 139,747.56 1,537,223.11 614,889.00

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

FORMULIR STANDAR UNTUK

Analisa LI - 2312

ANALISA MASING-MASING HARGA SATUAN

1.00 1,536,587.86 0.19

JUMLAH HARGA (Rp.)

57,372.35 14,343.09 1,967.05 73,682.49

470,906.73 136,867.50 0.00 9,000.00 24,264.00 576,675.00 1,217,713.23

70,373.52 13,615.25 21,513.57 0.00

105,502.34 1,396,898.06 139,689.81 1,536,587.86

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa LI - 2313

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 18,307.03 0.00

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

1,500.00 625.00 600.00 2,725.00

13,455.75 462.00

13,917.75

0.00

0.00 16,642.75 1,664.28 18,307.03

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa LI - 2314

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 450,879.00 0.06

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

75,000.00 31,250.00 15,000.00 121,250.00

288,640.00

288,640.00

0.00

0.00 409,890.00 40,989.00 450,879.00

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-241

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 442,123.08 0.06

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan

60,000.00 12,000.00

72,000.00

185,891.15 117,150.00

303,041.15

9,413.70 0.00

9,413.70 384,454.85 57,668.23 442,123.08

atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa LI-242

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 52,382.50 0.00

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

20,000.00 5,000.00 4,800.00 29,800.00

15,750.00

15,750.00

0.00

0.00 45,550.00 6,832.50 52,382.50

Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa LI-243

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 91,159.13 0.01

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

16,666.67 10,416.67 10,000.00 37,083.33

42,000.00 142.87 0.00 42.60 0.00

42,185.47

0.00

0.00 79,268.81 11,890.32 91,159.13

aan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-311a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.1.(1a) PERKIRAAN VOL. PEK. : Galian Biasa TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0511 0.0256

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

: : :

1.00 77,241.46 0.01

JUMLAH HARGA (Rp.)

730.01 438.00

1,168.01

BAHAN

JUMLAH HARGA BAHAN

C.

PERALATAN

1. 2. 3.

Excavator Dump Truck Alat Bantu

(E10) (E08)

Jam Jam Ls

0.0256 0.1793 1.0000

563,192.52 287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

0.00

14,389.70 51,608.78 0.00

65,998.48

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 67,166.49 OVERHEAD & PROFIT 15.0 % x D 10,074.97 HARGA SATUAN PEKERJAAN ( D + E ) 77,241.46 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-311b FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.1.(1b) PERKIRAAN VOL. PEK. : Galian batu lunak TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.4462 0.0558

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

1.00 181,821.51 0.02

JUMLAH HARGA (Rp.)

6,374.71 956.21

7,330.91

BAHAN

JUMLAH HARGA BAHAN C.

: : :

PERALATAN

0.00

1. 2. 3. 4. 5

Compressor Jack Hammer Wheel Loader Excavator Dump Truck Alat bantu

(E05) (E26) (E15) (E10) (E08)

Jam Jam Jam Jam Jam Ls

0.0558 0.0558 0.0558 0.0558 0.2686 1.0000

172,621.19 47,194.27 533,941.26 563,192.52 287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

9,628.58 2,632.43 29,782.53 31,414.13 77,317.08 0.00

150,774.75

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 158,105.66 OVERHEAD & PROFIT 15.0 % x D 23,715.85 HARGA SATUAN PEKERJAAN ( D + E ) 181,821.51 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-312 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.1.(2) PERKIRAAN VOL. PEK. : Galian Batu TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

1.0000 0.1250

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

: : :

1.00 378,802.73 0.05

JUMLAH HARGA (Rp.)

14,285.71 2,142.86

16,428.57

BAHAN

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5

PERALATAN Compressor Jack Hammer Wheel Loader Excavator Dump Truck Alat bantu

(E05) (E26) (E15) (E10) (E08)

Jam Jam Jam Jam Jam Ls

0.1250 0.1250 0.1250 0.1250 0.5153 1.0000

172,621.19 47,194.27 533,941.26 563,192.52 287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

0.00

21,577.65 5,899.28 66,742.66 70,399.06 148,346.45 0.00

312,965.11

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 329,393.68 OVERHEAD & PROFIT 15.0 % x D 49,409.05 HARGA SATUAN PEKERJAAN ( D + E ) 378,802.73 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-313 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.1.(3) PERKIRAAN VOL. PEK. : Galian Struktur dengan kedalaman 0 - TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

0.0311 0.0078

HARGA SATUAN (Rp.)

BAHAN

1.

Urugan Pilihan

(EI-322)

M3

0.5000

14,285.71 17,142.86

PERALATAN Excavator Bulldozer Alat bantu

(E10) (E04)

Jam Jam Ls

0.0078 0.014502 1.0000

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

444.17 133.25

577.42

1.00

JUMLAH HARGA BAHAN C. 1. 2. 3.

1.00 18,229.58 0.00

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA B.

: : :

0.50

0.50

563,192.52 751,333.11 0.00

4,377.71 10,896.17 0.00

15,273.89

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 15,851.81 OVERHEAD & PROFIT 15.0 % x D 2,377.77 HARGA SATUAN PEKERJAAN ( D + E ) 18,229.58 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-314 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.1.(4) PERKIRAAN VOL. PEK. : Galian Struktur dengan kedalaman 2 - TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

0.0864 0.0086

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2

Urugan Pilihan (EI-322) Bahan pengaman tebing galian

M3 Ls

1.0000 1.0000

PERALATAN Excavator Bulldozer Alat bantu

(E10) (E04)

Jam Jam Ls

0.0086 0.014502 1.0000

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

1.00 778,714.64 0.10

JUMLAH HARGA (Rp.)

1,233.81 148.06

1,381.87

1.00 660,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3.

: : :

1.00 660,000.00

660,001.00

563,192.52 751,333.11 0.00

4,864.12 10,896.17 0.00

15,760.30

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 677,143.17 OVERHEAD & PROFIT 15.0 % x D 101,571.48 HARGA SATUAN PEKERJAAN ( D + E ) 778,714.64 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-315 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.1.(5) PERKIRAAN VOL. PEK. : Galian Struktur dengan kedalaman 4 - TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

0.1555 0.0130

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2

Urugan Pilihan (EI-322) Bahan pengaman tebing galian

M3 Ls

0.6000 1.0000

PERALATAN Excavator Bulldozer Alat bantu

(E10) (E04)

Jam Jam Ls

0.0130 0.014502 1.0000

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

1.00 782,731.30 0.10

JUMLAH HARGA (Rp.)

2,220.87 222.09

2,442.95

1.00 660,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3.

: : :

0.60 660,000.00

660,000.60

563,192.52 751,333.11 0.00

7,296.18 10,896.17 0.00

18,192.36

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 680,635.91 OVERHEAD & PROFIT 15.0 % x D 102,095.39 HARGA SATUAN PEKERJAAN ( D + E ) 782,731.30 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-316 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.1.(6) PERKIRAAN VOL. PEK. : Galian Perkerasan Beraspal dengan ColTOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0741 0.0370

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

: : :

1.00 226,501.07 0.03

JUMLAH HARGA (Rp.)

1,058.20 634.92

1,693.12

BAHAN

JUMLAH HARGA BAHAN C. 1. 2 3.

PERALATAN Cold Milling Dump Truck Alat bantu

(E36) (E08)

Jam Jam Ls

0.0370 0.4672 1.0000

1,640,750.59 287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3

0.00

60,768.54 134,495.79 0.00

195,264.33

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 196,957.45 OVERHEAD & PROFIT 15.0 % x D 29,543.62 HARGA SATUAN PEKERJAAN ( D + E ) 226,501.07 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-317 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.1.(7) PERKIRAAN VOL. PEK. : Galian Perkerasan Beraspal tanpa ColdTOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.3333 0.1667

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

: : :

1.00 986,230.31 0.12

JUMLAH HARGA (Rp.)

4,761.90 2,857.14

7,619.05

BAHAN

JUMLAH HARGA BAHAN C. 1. 2. 3. 4

PERALATAN Jack Hammer Compresor Dump Truck Motor Greder

E26 E05 E08 E15

Jam Jam Jam Jam

2.4096 2.4096 1.1126 0.0000

47,194.27 172,621.19 287,873.37 533,941.26

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

0.00

113,721.14 415,954.67 320,296.71 0.00

849,972.52

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 857,591.57 OVERHEAD & PROFIT 15.0 % x D 128,638.74 HARGA SATUAN PEKERJAAN ( D + E ) 986,230.31 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-321 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.2.(1a) PERKIRAAN VOL. PEK. : Timbunan Biasa Dari Sumber Galian TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L02)

Jam Jam

HARGA SATUAN (Rp.)

0.0403 0.0101

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Bahan timbunan (M08)

M3

1.2000

60,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4 5. 6

PERALATAN Excavator Dump Truck Motor Grader Vibro Roller Water tank truck Alat Bantu

(E15) (E08) (E13) (E19) (E23)

Jam Jam Jam Jam Jam Ls

0.0101 0.1159 0.0037 0.0042 0.0070 1.0000

533,941.26 287,873.37 659,813.19 404,914.14 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

: : :

1.00 134,978.28 0.02

JUMLAH HARGA (Rp.)

575.78 172.73

748.51

72,000.00

72,000.00

5,380.07 33,369.13 2,467.25 1,693.92 1,713.53 0.00

44,623.90

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 117,372.41 OVERHEAD & PROFIT 15.0 % x D 17,605.86 HARGA SATUAN PEKERJAAN ( D + E ) 134,978.28 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-321 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.2.(1b) PERKIRAAN VOL. PEK. : Timbunan Biasa Dari Galian TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L02)

Jam Jam

HARGA SATUAN (Rp.)

0.1056 0.0264

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

: Err:509 : 134,978.28 : 0.02

JUMLAH HARGA (Rp.)

1,507.99 452.40

1,960.39

BAHAN Retribusi

JUMLAH HARGA BAHAN C. 1. 2. 3. 4 5. 6

PERALATAN Excavator Dump Truck Motor Grader Vibro Roller Water tank truck Alat Bantu

(E15) (E08) (E13) (E19) (E23)

Jam Jam Jam Jam Jam Ls

0.0264 0.4082 0.0037 0.0042 0.0070 1.0000

533,941.26 287,873.37 659,813.19 404,914.14 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

0.00

14,090.66 117,496.03 2,467.25 1,693.92 1,713.53 0.00

137,461.40

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 139,421.79 OVERHEAD & PROFIT 15.0 % x D 20,913.27 HARGA SATUAN PEKERJAAN ( D + E ) 160,335.06 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-322 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.2.(2a) PERKIRAAN VOL. PEK. : Timbunan Pilihan Dari Sumber Galian TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

1.0328 0.2582

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Bahan pilihan (M09)

(M09)

M3

1.1100

75,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 3. 4. 5.

PERALATAN Wheel Loader Dump Truck Motor Grader Tandem Water Tanker Alat Bantu

(E15) (E08) (E13) (E17) (E23)

Jam Jam Jam Jam Jam Ls

0.0085 0.2582 0.0040 0.0161 0.0070 1.0000

533,941.26 287,873.37 659,813.19 457,658.59 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

: : :

1.00 221,950.61 0.03

JUMLAH HARGA (Rp.)

14,753.95 4,426.19

19,180.14

83,250.00

83,250.00

4,540.96 74,327.22 2,618.31 7,370.37 1,713.53 0.00

90,570.39

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 193,000.53 OVERHEAD & PROFIT 15.0 % x D 28,950.08 HARGA SATUAN PEKERJAAN ( D + E ) 221,950.61 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-322 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.2.(2) PERKIRAAN VOL. PEK. : Timbunan Pilihan dari galian TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.5476 0.1369

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Retribusi

Rp

1.0000

PERALATAN Wheel Loader Dump Truck Motor Grader Tandem Water Tanker Alat Bantu

(E15) (E08) (E13) (E17) (E23)

Jam Jam Jam Jam Jam Ls

0.0085 0.1369 0.0040 0.0161 0.0070 1.0000

533,941.26 287,873.37 659,813.19 457,658.59 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

1.00 221,950.61 0.03

JUMLAH HARGA (Rp.)

7,822.44 2,346.73

10,169.17

0.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 3. 4. 5.

: : :

0.00

4,540.96 39,407.74 2,618.31 7,370.37 1,713.53 0.00

55,650.91

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 65,820.08 OVERHEAD & PROFIT 15.0 % x D 9,873.01 HARGA SATUAN PEKERJAAN ( D + E ) 75,693.09 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-323 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.2.(3a) PERKIRAAN VOL. PEK. : Timbunan Pilihan (diukur diatas bak tru TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L02)

Jam Jam

HARGA SATUAN (Rp.)

0.0142 0.0071

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Bahan pilihan (M09)

(M09)

M3

1.0000

75,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3.

PERALATAN Dump Truck Whell Loader Alat Bantu

(E08) (E15)

Jam Jam Ls

0.4507 0.0071 1.0000

287,873.37 533,941.26 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

: : :

1.00 240,171.61 0.03

JUMLAH HARGA (Rp.)

202.49 121.49

323.99

75,000.00

75,000.00

129,736.76 3,784.13 0.00

133,520.89

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 208,844.88 OVERHEAD & PROFIT 15.0 % x D 31,326.73 HARGA SATUAN PEKERJAAN ( D + E ) 240,171.61 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-323

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.2.(3b) PERKIRAAN VOL. PEK. : Timbunan Pilihan (diukur dengan rod daTOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L02)

Jam Jam

HARGA SATUAN (Rp.)

0.0142 0.0071

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Bahan pilihan (M09) Plate

(M09)

M3

1.0000 0.0000

75,000.00 2.00

JUMLAH HARGA BAHAN C. 1. 2. 3.

PERALATAN Dump Truck Whell Loader Alat Bantu

(E08) (E15)

Jam Jam Ls

0.4507 0.0071 1.0000

287,873.37 533,941.26 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

: : :

1.00 240,171.61 0.03

JUMLAH HARGA (Rp.)

202.49 121.49

323.99

75,000.00 0.00

75,000.00

129,736.76 3,784.13 0.00

133,520.89

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 208,844.88 OVERHEAD & PROFIT 15.0 % x D 31,326.73 HARGA SATUAN PEKERJAAN ( D + E ) 240,171.61 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.3.(1) PERKIRAAN VOL. PEK. : Penyiapan Badan Jalan TOTAL HARGA (Rp.) : M2 0 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L02)

jam jam

HARGA SATUAN (Rp.)

0.0390 0.0098

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

: : :

1.00 8,591.78 0.00

JUMLAH HARGA (Rp.)

557.82 167.35

725.17

BAHAN

JUMLAH HARGA BAHAN C. 1. 2. 3

PERALATAN Motor Grader Vibro Roller Alat Bantu

(E13) (E19)

jam jam Ls

0.0098 0.0008 1.0000

659,813.19 404,914.14 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3

0.00

6,441.03 304.91 0.00

6,745.94

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 7,471.11 OVERHEAD & PROFIT 15.0 % x D 1,120.67 HARGA SATUAN PEKERJAAN ( D + E ) 8,591.78 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-341 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA MATA PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 3.4.(1) PERKIRAAN VOL. PEK. : Pembersihan dan Pengupasan Lahan TOTAL HARGA (Rp.) : M2 (diameter < 30 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

jam jam

HARGA SATUAN (Rp.)

0.0700 0.0140

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Bahan timbunan

(M08)

M3

1.2000

60,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1 2

Dump Truck Alat Bantu

E09

jam Ls

0.0020 1.0000

495,785.15 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

: : :

1.00 85,370.89 0.01

JUMLAH HARGA (Rp.)

1,000.00 240.00

1,240.00

72,000.00

72,000.00

995.55 0.00

995.55

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 74,235.55 OVERHEAD & PROFIT 15.0 % x D 11,135.33 HARGA SATUAN PEKERJAAN ( D + E ) 85,370.89 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-342 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 3.4.(2) PERKIRAAN VOL. PEK. : Pemotongan Pohon Pilihan diameter 15TOTAL HARGA (Rp.) : buah % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

Jam Jam

JUMLAH HARGA

(Rp.)

(Rp.)

3.5000 0.3500

14,285.71 17,142.86

50,000.00 6,000.00

56,000.00

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Dump Truck Chainsaw Alat Bantu

E09

Jam Jam Ls

0.1880 1.0000 1.0000

495,785.15 12,000,000.00 0.00

JUMLAH HARGA PERALATAN

D. E. F.

1.00 13,971,561.27 1.74

HARGA SATUAN

JUMLAH HARGA TENAGA B.

: : :

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

0.00

93,183.71 12,000,000.00 0.00

12,093,183.71

12,149,183.71 1,822,377.56 13,971,561.27

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-343 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 3.4.(3) PERKIRAAN VOL. PEK. : Pemotongan Pohon Pilihan diameter 30TOTAL HARGA (Rp.) : buah % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

Jam Jam

JUMLAH HARGA

(Rp.)

(Rp.)

3.5000 0.3500

14,285.71 17,142.86

50,000.00 6,000.00

56,000.00

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Dump Truck Chainsaw Alat Bantu

E09

Jam Jam Ls

0.2982 1.0000 1.0000

495,785.15 0.00 0.00

JUMLAH HARGA PERALATAN

D. E.

1.00 234,415.48 0.03

HARGA SATUAN

JUMLAH HARGA TENAGA B.

: : :

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D

0.00

147,839.55 0.00 0.00

147,839.55

203,839.55 30,575.93

F. Note: 1 2

3 4

HARGA SATUAN PEKERJAAN ( D + E ) 234,415.48 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-344 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 3.4.(4) PERKIRAAN VOL. PEK. : Pemotongan Pohon Pilihan diameter 50TOTAL HARGA (Rp.) : buah % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

Jam Jam

1.00 332,303.18 0.04

HARGA SATUAN

JUMLAH HARGA

(Rp.)

(Rp.)

3.5000 0.3500

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

: : :

50,000.00 6,000.00

56,000.00

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Dump Truck Chainsaw Alat Bantu

E09

Jam Jam Ls

0.4699 1.0000 1.0000

495,785.15 0.00 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

0.00

232,959.29 0.00 0.00

232,959.29

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 288,959.29 OVERHEAD & PROFIT 15.0 % x D 43,343.89 HARGA SATUAN PEKERJAAN ( D + E ) 332,303.18 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-345 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 3.4.(5) PERKIRAAN VOL. PEK. : Pemotongan Pohon Pilihan diameter > TOTAL HARGA (Rp.) : buah % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

Jam Jam

0.00 0.00 0.00

HARGA SATUAN

JUMLAH HARGA

(Rp.)

(Rp.)

4.6667 0.4667

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

: : :

66,666.67 8,000.00

74,666.67

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Dump Truck Chainsaw Alat Bantu

E09

Jam Jam Ls

1.0301 1.0301 1.0000

495,785.15 0.00 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

0.00

510,718.44 0.00 0.00

510,718.44

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 585,385.10 OVERHEAD & PROFIT 15.0 % x D 87,807.77 HARGA SATUAN PEKERJAAN ( D + E ) 673,192.87 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-318 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.1.(8) PERKIRAAN VOL. PEK. : Galian Perkerasan berbutir TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

1.5000 0.2500

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

: : :

1.00 172,059.95 0.02

JUMLAH HARGA (Rp.)

21,428.57 4,285.71

25,714.29

BAHAN

JUMLAH HARGA BAHAN C. 1. 2. 3.

PERALATAN Jack Hammer Compresor Dump Truck

E26 E05 E08

Jam Jam Jam

0.2677 0.2677 0.2260

47,194.27 172,621.19 287,873.37

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3

0.00

12,635.68 46,217.19 65,050.19

123,903.06

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 149,617.34 OVERHEAD & PROFIT 15.0 % x D 22,442.60 HARGA SATUAN PEKERJAAN ( D + E ) 172,059.95 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-319 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 3.1.(9). PERKIRAAN VOL. PEK. : Galian Perkerasan Beton TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

1.0000 0.1667

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

: : :

1.00 202,496.33 0.03

JUMLAH HARGA (Rp.)

14,285.71 2,857.14

17,142.86

BAHAN

JUMLAH HARGA BAHAN C. 1. 2. 3.

PERALATAN Jack Hammer Compresor Dump Truck

E26 E05 E08

Jam Jam Jam

0.4016 0.4016 0.2455

47,194.27 172,621.19 287,873.37

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3

0.00

18,953.52 69,325.78 70,661.60

158,940.91

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 176,083.76 OVERHEAD & PROFIT 15.0 % x D 26,412.56 HARGA SATUAN PEKERJAAN ( D + E ) 202,496.33 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-421 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 4.2.(1) PERKIRAAN VOL. PEK. : Lapis Pondasi Agregat Kelas A TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0661 0.0094

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Agregat A

(M26)

M3

1.2586

485,646.60

JUMLAH HARGA BAHAN C.

PERALATAN

1 2 3 4 5 6

Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker Alat Bantu

E15 E08 E13 E17 E23

Jam Jam Jam Jam Jam Ls

0.0094 1.1993 0.0094 0.0119 0.0141 1.0000

533,941.26 287,873.37 659,813.19 457,658.59 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

: : :

1.00 1,124,302.99 0.14

JUMLAH HARGA (Rp.)

943.91 161.81

1,105.73

611,239.32

611,239.32

5,039.94 345,235.63 6,182.99 5,424.10 3,427.07 0.00

365,309.73

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 977,654.78 OVERHEAD & PROFIT 15.0 % x D 146,648.22 HARGA SATUAN PEKERJAAN ( D + E ) 1,124,302.99 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-422a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 4.2.(2a) PERKIRAAN VOL. PEK. : Lapis Pondasi Agregat Kelas B TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0595 0.0085

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Agregat B

(M27)

M3

1.2586

420,682.37

JUMLAH HARGA BAHAN C.

PERALATAN

1 2 3 4 5 6

Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker Alat Bantu

E15 E08 E13 E17 E23

Jam Jam Jam Jam Jam Ls

0.0085 1.1763 0.0094 0.0107 0.0141 1.0000

533,941.26 287,873.37 659,813.19 457,658.59 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

: : :

1.00 1,021,364.10 0.13

JUMLAH HARGA (Rp.)

849.52 145.63

995.15

529,474.73

529,474.73

4,535.95 338,625.51 6,182.99 4,901.30 3,427.07 0.00

357,672.81

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 888,142.69 OVERHEAD & PROFIT 15.0 % x D 133,221.40 HARGA SATUAN PEKERJAAN ( D + E ) 1,021,364.10 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-423 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 4.2.(3) PERKIRAAN VOL. PEK. : Semen untuk Lapis Pondasi Semen Tan TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

2.4306 0.1620

14,285.71 17,142.86

JUMLAH HARGA TENAGA B. 1.

BAHAN Semen

(M12)

Kg

1,050.0000

PERALATAN Dump Truck

(E08)

Jam

1.0000

1,269.98

287,873.37

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

1.00 1,907,674.19 0.24

JUMLAH HARGA (Rp.)

34,722.22 2,777.78

37,500.00

JUMLAH HARGA BAHAN C. 1.

: : :

1,333,473.75

1,333,473.75

287,873.37

287,873.37

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,658,847.12 OVERHEAD & PROFIT 15.0 % x D 248,827.07 HARGA SATUAN PEKERJAAN ( D + E ) 1,907,674.19 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-424 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 4.2.(4) PERKIRAAN VOL. PEK. : Lapis Pondasi Semen Tanah TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0562 0.0080

14,285.71 17,142.86

JUMLAH HARGA TENAGA B. 1.

BAHAN Tanah Timbunan (M08)

M3

1.2000

60,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7. 8.

PERALATAN Wheel Loader Dump Truck Motor Grader Vibratory Roller P. Tyre Roller Water Tanker Cold Milling Alat Bantu

(E15) (E08) (E13) (E19) (E18) (E23) (E36)

Jam Jam Jam Jam Jam Jam Jam Ls

0.0080 0.1529 0.0094 0.0268 0.0065 0.0141 0.0167 1.0000

533,941.26 287,873.37 659,813.19 404,914.14 424,352.69 243,811.40 1,640,750.59 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

: : :

1.00 197,665.40 0.02

JUMLAH HARGA (Rp.)

802.33 137.54

939.87

72,000.00

72,000.00

4,283.95 44,011.87 6,182.99 10,841.07 2,740.47 3,427.07 27,455.67 0.00 98,943.09

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 171,882.96 OVERHEAD & PROFIT 15.0 % x D 25,782.44 HARGA SATUAN PEKERJAAN ( D + E ) 197,665.40 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-425 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 4.2.(5) PERKIRAAN VOL. PEK. : Agregat Penutup BURTU TOTAL HARGA (Rp.) : M2 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L02)

Jam Jam

HARGA SATUAN (Rp.)

0.0024 0.0001

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Chipping

(M41)

Kg

33.0000

PERALATAN

1. 2. 3. 4.

Wheel Loader Dump Truck P. Tyre Roller Alat Bantu

E15 E08 E18

Jam Jam Jam Ls

0.0001 0.0142 0.0006 1.0000

1,200.00

533,941.26 287,873.37 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

1.00 50,673.52 0.01

JUMLAH HARGA (Rp.)

34.93 2.10

37.03

JUMLAH HARGA BAHAN C.

: : :

39,600.00

39,600.00

65.28 4,087.58 274.05 0.00

4,426.91

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 44,063.93 OVERHEAD & PROFIT 15.0 % x D 6,609.59 HARGA SATUAN PEKERJAAN ( D + E ) 50,673.52 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-426 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 4.2.(6) PERKIRAAN VOL. PEK. : Bahan Aspal untuk Pekerjaan PelaburanTOTAL HARGA (Rp.) : Liter % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0021 0.0004

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Aspal Minyak Tanah

(M10) (M11)

Kg Liter

1.0790 0.0524

12,000.00 8,383.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Asphalt Distributor (E41) Air Compresor (E05)

Jam Jam

0.0002 0.0002

384,601.49 172,621.19

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

: : :

1.00 15,571.77 0.00

JUMLAH HARGA (Rp.)

29.76 7.14

36.90

12,948.57 439.11

13,387.68

80.13 35.96

116.09

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 13,540.67 OVERHEAD & PROFIT 15.0 % x D 2,031.10 HARGA SATUAN PEKERJAAN ( D + E ) 15,571.77 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-427 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 4.2.(7) PERKIRAAN VOL. PEK. : Lapis Resap Pengikat TOTAL HARGA (Rp.) : Liter % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0021 0.0004

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Aspal Kerosene

(M10) (M11)

Kg liter

0.6345 0.4840

12,000.00 8,383.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Asp. Distributor Air Compresor (E05)

E41

Jam Jam

0.0002 0.0002

384,601.49 172,621.19

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

: : :

1.00 16,809.00 0.00

JUMLAH HARGA (Rp.)

29.76 7.14

36.90

7,613.76 4,057.37

11,671.13

80.13 35.96

116.09

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 11,824.12 OVERHEAD & PROFIT 15.0 % x D 1,773.62 HARGA SATUAN PEKERJAAN ( D + E ) 13,597.74 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-512 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 4.2.(2b) PERKIRAAN VOL. PEK. : Lapis Pondasi Agregat Kelas S TOTAL HARGA : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

jam jam

HARGA SATUAN (Rp.)

0.0595 0.0085

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Aggregat S

M27

M3

1.2586

378,488.76

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6.

PERALATAN Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker Alat Bantu

(E15) (E08) (E13) (E17) (E23)

jam jam jam jam jam Ls

0.0085 0.1888 0.0043 0.0054 0.0141 1.0000

533,941.26 287,873.37 659,813.19 457,658.59 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

: : :

1.00 626,681.24 0.08

JUMLAH HARGA (Rp.)

849.52 145.63

995.15

476,369.46

476,369.46

4,535.95 54,351.47 2,810.45 2,450.65 3,427.07 0.00

67,575.59

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 544,940.20 OVERHEAD & PROFIT 15.0 % x D 81,741.03 HARGA SATUAN PEKERJAAN ( D + E ) 626,681.24 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 5.1.(1) PERKIRAAN VOL. PEK. : Lapis Pondasi Agregat Kelas A TOTAL HARGA : M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

jam jam

HARGA SATUAN (Rp.)

0.0661 0.0094

: : :

JUML HAR (Rp

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Aggrgat A

M26

M3

1.2586

485,646.60

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7.

PERALATAN Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker Alat Bantu

(E15) (E08) (E13) (E17) (E23)

jam jam jam jam jam Ls

0.0094 1.5225 0.0078 0.0134 0.0141 1.0000

533,941.26 287,873.37 659,813.19 457,658.59 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 5.1.(2) PERKIRAAN VOL. PEK. : Lapis Pondasi Agregat Kelas B TOTAL HARGA : M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

jam jam

HARGA SATUAN (Rp.)

0.0661 0.0094

: : :

JUML HAR (Rp

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Aggregat B

M27

M3

1.2586

420,682.37

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6.

PERALATAN Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker Alat Bantu

(E15) (E08) (E13) (E17) (E23)

jam jam jam jam jam Ls

0.0094 1.4674 0.0043 0.0054 0.0141 1.0000

533,941.26 287,873.37 659,813.19 457,658.59 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 5.2,(1) PERKIRAAN VOL. PEK. : Lapis Permukaan Agregat Tanpa PenutuTOTAL HARGA : M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0595 0.0085

: : :

JUML HAR (Rp

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Agregat Kelas C1 (M28)

M3

1.2586

319,316.63

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4. 5. 6. 7.

Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker Alat Bantu

(E15) (E08) (E13) (E17) (E23)

Jam Jam Jam Jam Jam Ls

0.0085 0.1175 0.0043 0.0107 0.0141 1.0000

533,941.26 287,873.37 659,813.19 457,658.59 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 5.4.(2) PERKIRAAN VOL. PEK. : Lapis Pondasi Semen Tanah TOTAL HARGA : M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.1784 0.0085

: : :

JUML HAR (Rp

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Tanah Timbunan Curing membran Chipping

(M08)

M3 liter M3

1.2000 1.3333 0.0057

60,000.00 12,006.39 0.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7. 8.

PERALATAN Wheel Loader Dump Truck Motor Grader Vibrator Roller P. Tyre Roller Water Tanker Pulvi Mixer Alat Bantu

(E15) (E08) (E13) (E19) (E18) (E23) (E27)

Jam Jam Jam Jam Jam Jam Jam Ls

0.0085 0.1685 0.0043 0.0107 0.0036 0.0141 0.0067 1.0000

533,941.26 287,873.37 659,813.19 404,914.14 424,352.69 243,811.40 1,274,973.32 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 5.4.(1) PERKIRAAN VOL. PEK. : Semen untuk Lapis Pondasi Semen Tan TOTAL HARGA : Ton % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

2.4306 0.1620

: : :

JUML HAR (Rp

14,285.71 17,142.86

JUMLAH HARGA TENAGA B. 1.

BAHAN Semen

(M12)

Kg

1,050.0000

1,269.98

JUMLAH HARGA BAHAN C. 1.

PERALATAN Dump Truck

(E08)

Jam

0.5000

287,873.37

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan.

2

3 4

Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

A. 1. 2. 3.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 5.3.(2) PERKIRAAN VOL. PEK. : Perkerasan Beton Semen dengan ATOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

TENAGA Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

HARGA SATUAN (Rp.)

1.4056 0.7028 0.1506

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B. 1. 2 3 4 5 6 7 8 9 10 11 12

BAHAN Semen Pasir Agregat Kasar Baja Tulangan Polos Joint Sealent Cat Anti Karat Expansion Cap Polytene 125 mikron Curing Compound Formwork Plate Paku

Additive

(M12) (M01a) (M03) (M39a) (M94) (M95) (M96) (M97) (M98) (M18) (M67a)

Kg M3 M3 Kg Kg Kg M2 Kg Ltr M2 Kg Ltr

410.0000 0.6237 0.7885 45.0000 0.9900 0.0200 0.1700 0.3281 0.6525 0.5700 0.3500 0.8568

1,269.98 260,700.00 0.00 11,440.00 39,390.00 42,390.00 6,050.00 19,250.00 38,500.00 750,000.00 20,220.00 38,500.00

JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8

D. E. F. G.

PERALATAN Wheel Loader Batching Plant Truck Mixer Con. Vibrator Water Tank Truck Conc. Paver Alat Bantu

E15 E43 E49 E20 E23 E42

jam jam jam jam jam jam Ls

0.0244 0.0502 0.1147 0.0502 0.0422 0.0074 1.0000

JUMLAH HARGA PERALATAN JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) HARGA SATUAN PEKERJAAN / M3

533,941.26 645,958.07 651,706.64 53,568.78 243,811.40 546,406.61 0.00

: : :

JUML HAR (Rp

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

A. 1. 2. 3.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 5.3.(3) PERKIRAAN VOL. PEK. : Lapis Pondasi bawah Beton Kurus TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

TENAGA Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

HARGA SATUAN (Rp.)

1.5060 0.4016 0.1004

: : :

JUML HAR (Rp

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B. 1. 2 3 4 5 6

BAHAN Semen Pasir Agregat Kasar Multiplex 12 mm Kayu Acuan

Paku

(M12) (M01a) (M03) (M73) (M99) (M18)

Kg M3 M3 Lbr M3 Kg

309.5500 0.4991 0.8837 0.1600 0.0960 0.2500

1,269.98 260,700.00 0.00 209,640.00 2,200,000.00 20,220.00

JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7

D. E. F. G. Note: 1

PERALATAN Wheel Loader Batching Plant Truck Mixer Con. Vibrator Water Tank Truck Conc. Paver Alat Bantu

E15 E43 E49 E20 E23 E42

jam jam jam jam jam jam Ls

0.0244 0.0502 0.1147 0.0502 0.0422 0.0037 1.0000

533,941.26 645,958.07 651,706.64 53,568.78 243,811.40 546,406.61 0.00

JUMLAH HARGA PERALATAN JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) HARGA SATUAN PEKERJAAN / M3 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

A. 1. 2. 3.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 5.5.(1) PERKIRAAN VOL. PEK. : Lapis Pondasi Atas Bersemen (CemTOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

TENAGA Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

HARGA SATUAN (Rp.)

1.0542 0.3012 0.1506

: : :

JUML HAR (Rp

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B. 1.

BAHAN Semen

(M12)

Kg

87.1250

1,269.98

2

Agregat Kasar

(M03)

M3

1.2586

0.00

JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8

D. E. F. G. Note: 1

PERALATAN Wheel Loader Batching Plant Dump Truck Vibrator Roller Water Tank Truck Screed Paver Alat Bantu

E15 E43 E08 E23

jam jam jam jam jam jam Ls

0.0244 0.0753 0.1682 0.0054 0.0422 0.0096 1.0000

533,941.26 645,958.07 287,873.37 0.00 243,811.40 0.00 0.00

JUMLAH HARGA PERALATAN JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) HARGA SATUAN PEKERJAAN / M3 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

A. 1. 2. 3.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 5.5.(2) PERKIRAAN VOL. PEK. : Lapis Pondasi Bawah (Cement TreaTOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

TENAGA Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

HARGA SATUAN (Rp.)

1.0542 0.3012 0.1506

JUML HAR (Rp

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B. 1.

BAHAN Semen

(M12)

Kg

112.7500

1,269.98

2

Agregat Kasar

(M03)

M3

1.2586

0.00

JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8

D. E. F. G.

PERALATAN Wheel Loader Batching Plant Dump Truck Vibrator Roller Water Tank Truck Screed Paver Alat Bantu

E15 E53 E08 E55 E23 E54

jam jam jam jam jam jam Ls

0.0244 0.0753 0.1682 0.0054 0.0422 0.0127 1.0000

JUMLAH HARGA PERALATAN JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) HARGA SATUAN PEKERJAAN / M3

: : :

533,941.26 45,934.46 287,873.37 183,925.71 243,811.40 45,934.46 0.00

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : ……………………… PERKIRAAN VOL. PEK. : Lapis Pondasi Agregat Tanpa Penutup ATOTAL HARGA : M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

jam jam

0.0595 0.0085

HARGA SATUAN (Rp.)

: : :

JUML HAR (Rp

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Lps Pondasi Agr

(M27a)

M3

1.2586

314,369.27

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6.

PERALATAN Wheel Loader Dump Truck Motor Grader Tandem Vibro Roller Water Tanker Alat Bantu

(E15) (E08) (E13) (E17) (E23)

jam jam jam jam jam Ls

0.0085 0.4863 0.0032 0.0030 0.0141 1.0000

533,941.26 287,873.37 659,813.19 457,658.59 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

A. 1. 2. 3.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 5.3.(1) PERKIRAAN VOL. PEK. : Perkerasan Jalan Beton TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

TENAGA Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

1.4056 0.7028 0.1506

HARGA SATUAN (Rp.)

: : :

JUML HAR (Rp

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B. 1. 2 3 4 5 6 7 8 9 10 11 12 13

BAHAN Semen Pasir Agregat Kasar Baja Tulangan Polos Joint Sealent Cat Anti Karat Expansion Cap Polytene 125 mikron Curing Compound

C. 1 2 3 4 5 6 7 8

PERALATAN Wheel Loader Batching Plant Truck Mixer Con. Vibrator Water Tank Truck Conc. Paver Alat Bantu

D. E. F. G. Note: 1

Multiplex 12 mm Kayu Acuan

Paku Additive

(M12) (M01a) (M03) (M39a) (M94) (M95) (M96) (M97) (M98) (M73) (M99) (M18) (M67a)

Kg M3 M3 Kg Kg Kg M2 Kg Ltr Lbr M3 Kg Ltr

E15 E43 E49 E20 E23 E42

jam jam jam jam jam jam Ls

410.0000 1,269.98 0.6237 260,700.00 0.7885 0.00 15.8750 11,440.00 0.9900 39,390.00 0.0200 42,390.00 0.1700 6,050.00 0.4375 19,250.00 0.8700 38,500.00 0.1600 209,640.00 0.0960 2,200,000.00 1.0240 20,220.00 0.9139 38,500.00 JUMLAH HARGA BAHAN

0.0244 0.0502 0.1288 0.0502 0.0422 0.0074 1.0000

533,941.26 645,958.07 651,706.64 53,568.78 243,811.40 546,406.61 0.00

JUMLAH HARGA PERALATAN JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) HARGA SATUAN PEKERJAAN / M3 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-511

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 1,230,911.93 0.15

JUMLAH HARGA (Rp.)

943.91 161.81

1,105.73

611,239.32

611,239.32

5,039.94 438,280.42 5,139.11 6,126.62 3,427.07 0.00

458,013.16

1,070,358.20 160,553.73 1,230,911.93 perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

raan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-512

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 1,111,759.65 0.14

JUMLAH HARGA (Rp.)

943.91 161.81

1,105.73

529,474.73

529,474.73

5,039.94 422,438.96 2,810.45 2,450.65 3,427.07 0.00

436,167.07 966,747.53 145,012.13 1,111,759.65

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

raan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-521

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 520,234.92 0.06

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

raan setiap komponen untuk menyelesaikan satu satuan pekerjaan

849.52 145.63

995.15

401,894.87

401,894.87

4,535.95 33,813.41 2,810.45 4,901.30 3,427.07 0.00

49,488.17 452,378.20 67,856.73 520,234.92

atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-542

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 170,615.36 0.02

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

raan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

2,548.57 145.63

2,694.20

72,000.00

72,000.00

4,535.95 48,499.80 2,810.45 4,336.43 1,523.33 3,427.07 8,533.96 0.00 73,666.99 148,361.19 22,254.18 170,615.36

Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-541

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 1,742,147.00 0.22

JUMLAH HARGA (Rp.)

34,722.22 2,777.78

37,500.00

1,333,473.75

1,333,473.75

143,936.69

143,936.69

1,514,910.44 227,236.57 1,742,147.00 perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

raan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-532

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 2,196,976.12 0.27

JUMLAH HARGA (Rp.)

20,080.32 12,550.20 2,581.76 35,212.28

520,689.75 162,591.57 0.00 514,800.00 38,996.10 847.80 1,028.50 6,316.41 25,121.25 427,500.00 7,077.00 32,986.80 1,737,955.18

13,034.24 32,427.61 74,750.60 2,689.20 10,281.20 4,063.71 0.00

137,246.56 1,910,414.01 286,562.10 2,196,976.12 2,196,976.12

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

raan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-533

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 1,079,452.76 0.13

JUMLAH HARGA (Rp.)

21,514.63 7,171.54 1,721.17 30,407.34

393,120.76 130,114.37 0.00 33,542.40 211,200.00 5,055.00

773,032.53

13,034.24 32,427.61 74,750.60 2,689.20 10,281.20 2,031.86 0.00

135,214.70 938,654.58 140,798.19 1,079,452.76 1,079,452.76 perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

raan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-551

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 279,429.53 0.03

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

15,060.24 5,378.66 2,581.76 23,020.65

110,646.57 0.00

110,646.57

13,034.24 48,641.42 48,413.68 0.00 10,281.20 0.00 0.00

120,370.55 254,037.77 38,105.67 292,143.44 292,143.44

raan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-552

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 292,143.44 0.04

JUMLAH HARGA (Rp.)

15,060.24 5,378.66 2,581.76 23,020.65

143,189.68 0.00

143,189.68

13,034.24 3,458.92 48,413.68 998.19 10,281.20 585.64 0.00

76,771.87 242,982.20 36,447.33 279,429.53 279,429.53

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

raan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-522

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 630,326.60 0.08

JUMLAH HARGA (Rp.)

perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

raan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

849.52 145.63

995.15

395,668.07

395,668.07

4,535.95 139,997.52 2,107.84 1,378.49 3,427.07 0.00

151,446.86 548,110.09 82,216.51 630,326.60

Analisa EI-531

FORMULIR STANDAR UNTUK ANALISA MASING-MASING HARGA SATUAN

1.00 1,644,423.60 0.21

JUMLAH HARGA (Rp.)

20,080.32 12,550.20 2,581.76 35,212.28

520,689.75 162,591.57 0.00 181,610.00 38,996.10 847.80 1,028.50 8,421.88 33,495.00 33,542.40 211,200.00 20,705.28 35,185.92 1,248,314.20

13,034.24 32,427.61 83,911.13 2,689.20 10,281.20 4,063.71 0.00

146,407.09 1,429,933.57 214,490.04 1,644,423.60 1,644,423.60 perasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

raan setiap komponen untuk menyelesaikan satu satuan pekerjaan atuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-611a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.1 (1)(a) PERKIRAAN VOL. PEK. : Lapis Resap Pengikat - Aspal Cair TOTAL HARGA (Rp.) : Liter % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0024 0.0004

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Aspal Kerosene

(M10) (M11)

Kg liter

0.9063 0.4284

12,000.00 8,383.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Asp. Distributor Compressor

E41 E05

Jam Jam

0.0002 0.0002

384,601.49 172,621.19

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-612a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.1 (2)(a) PERKIRAAN VOL. PEK. : Lapis Perekat - Aspal Cair TOTAL HARGA (Rp.) : Liter % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0400 0.0067

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Aspal Kerosene

(M10) (M11)

Kg liter

1.1329 0.2380

12,000.00 8,383.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Asp. Distributor Compressor

E41 E05

Jam Jam

0.0033 0.0033

384,601.49 172,621.19

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-621 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.2 (1) PERKIRAAN VOL. PEK. : Agregat Penutup BURTU TOTAL HARGA (Rp.) : M2 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L02)

Jam Jam

HARGA SATUAN (Rp.)

0.2126 0.0106

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Chipping

(M41)

Kg

23.0000

1,200.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4.

Wheel Loader Dump Truck P. Tyre Roller Alat Bantu

E15 E08 E18

Jam Jam Jam Ls

0.0106 0.0320 0.0005 1.0000

533,941.26 287,873.37 424,352.69 10.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-622 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.2 (2) PERKIRAAN VOL. PEK. : Agregat Penutup BURDA TOTAL HARGA (Rp.) : M2 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.3544 0.0177

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Chipping

(M41)

Kg

35.0000

1,200.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4.

Wheel Loader Dump Truck P. Tyre Roller Alat Bantu

E15 E08 E18

Jam Jam Jam Ls

0.0177 0.0499 0.0011 1.0000

533,941.26 287,873.37 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-631 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3 (1) PERKIRAAN VOL. PEK. : Latasir Kelas A (SS-A) TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0046 0.0007

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4

Pasir Kasar Pasir Halus Semen Aspal

M01a M01c (M05) (M10)

M3 M3 Kg Kg

0.0069 0.0138 1.0395 3.3990

260,700.00 234,300.00 1,500.00 12,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0003 0.0007 0.0007 0.0282 0.0013 0.0013 0.0109 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

: : :

JUMLAH HARGA (Rp.)

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-632 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3 (2) PERKIRAAN VOL. PEK. : Latasir Kelas B (SS-B) TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0062 0.0009

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4

Pasir Kasar Pasir Halus Semen Aspal

(M01a) (M01c) (M05) (M10)

M3 M3 Kg Kg

0.0139 0.0139 31.5000 92.7000

260,700.00 234,300.00 1,500.00 12,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0003 0.0009 0.0009 0.0376 0.0013 0.0013 0.0004 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-633a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3(3a) PERKIRAAN VOL. PEK. : Lataston Lapis Aus (HRS-WC) (gradasi TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.1334 0.0191

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4 5

Agr 5-10 & 10-15 Lolos screen2 ukuran ( 0 - 5) Pasir Halus (M01c) Semen (M05) Aspal (M10)

M3 M3 M3 Kg Kg

0.2440 0.1538 0.2481 23.1000 75.1900

308,439.30 420,978.60 234,300.00 1,500.00 12,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0201 0.5565 0.0191 0.0157 0.0043 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D

: : :

JUMLAH HARGA (Rp.)

F. Note: 1 2

3 4

HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-633a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3(3b) PERKIRAAN VOL. PEK. : Lataston Lapis Aus Perata (HRS-WC(L))TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.1334 0.0191

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4 5

Agr 5-10 & 10-15 Lolos screen2 ukuran ( 0 - 5) Pasir Halus (M01c) Semen (M05) Aspal (M10)

M3 M3 M3 Kg Kg

0.2440 0.1538 0.2481 23.1000 75.1900

308,439.30 420,978.60 234,300.00 1,500.00 12,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0201 0.5565 0.0191 0.0157 0.0043 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

: : :

JUMLAH HARGA (Rp.)

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-634a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3.(4a) PERKIRAAN VOL. PEK. : Lataston Lapis Pondasi (HRS-Base) (gr TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0286 0.0041

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4 5

Agr 5-10 & 10-15 (M92) Lolos screen2 ukuran ( 0 (M91) Pasir Halus (M01c) Semen (M05) Aspal (M10)

M3 M3 M3 Kg Kg

0.2958 0.1404 0.2265 15.7500 61.8000

308,439.30 420,978.60 234,300.00 1,500.00 12,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0201 0.5565 0.0041 0.0158 0.0049 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan.

2

3 4

Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-634b FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3.(4b) PERKIRAAN VOL. PEK. : Lataston Lapis Pondasi Perata (HRS-Bas TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0286 0.0041

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4 5

Agr 5-10 & 10-15 (M92) Lolos screen2 ukuran ( 0 (M91) Pasir Halus (M01c) Semen (M05) Aspal (M10)

M3 M3 M3 Kg Kg

0.2958 0.1404 0.2265 15.7500 61.8000

308,439.30 420,978.60 234,300.00 1,500.00 12,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0201 0.5565 0.0041 0.0158 0.0049 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-635a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3(5a) PERKIRAAN VOL. PEK. : Laston Lapis Aus (AC-WC) TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.2008 0.0201

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 0 - 5) Semen (filler) (M05) Aspal (M10)

M3 M3 Kg Kg

0.3268 0.3210 19.9500 70.2100

308,439.30 420,978.60 1,500.00 12,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asp. Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0117 0.0201 0.0201 1.2946 0.0137 0.0135 0.0058 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

: : :

JUMLAH HARGA (Rp.)

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-635b FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN polimer asbuton semi extraksi PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3(5b) PERKIRAAN VOL. PEK. : Laston Lapis Aus Modifikasi (AC-WC MoTOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN DASAR (Rp.)

0.2008 0.0201

14,285.71 17,142.86

JUMLAH HARGA TENAGA

B.

BAHAN

1. 2. 3 4

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 0 - 5) Semen (M05) Aspal Modifikasi (M10)

M3 M3 Kg Kg

0.2975 0.3519 9.8700 63.8600

308,439.30 420,978.60 1,500.00 8,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asp. Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0201 0.5565 0.0137 0.0135 0.0058 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN

: : :

JUMLAH HARGA (Rp.)

D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

: Laston Lapis Aus Modifikasi (AC-WC Mod) - modifikasi polimer

: Laston Lapis Aus Modifikasi (AC-WC Mod) - Asbuton semi ekstraksi

Analisa EI-635c

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3(5c) PERKIRAAN VOL. PEK. : Laston Lapis Aus Perata (AC-WC(L)) TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.2008 0.0201

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 0 - 5) Semen (M05) Aspal (M10)

M3 M3 Kg Kg

0.2978 0.3523 9.8700 62.8300

308,439.30 420,978.60 1,500.00 12,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asp. Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0201 0.5565 0.0137 0.0135 0.0058 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

: : :

JUMLAH HARGA (Rp.)

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-635d

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3(5d) PERKIRAAN VOL. PEK. : Laston Lapis Aus Modifikasi Perata (A TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN DASAR (Rp.)

0.2008 0.0201

14,285.71 17,142.86

JUMLAH HARGA TENAGA

B.

BAHAN

1. 2. 3 4

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 0 - 5) Filler Added Aspal modifikasi (M10)

M3 M3 Kg Kg

0.2943 0.3482 9.7650 74.2630

308,439.30 420,978.60 1,500.00 8,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asp. Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0201 0.5565 0.0137 0.0135 0.0058 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D

: : :

JUMLAH HARGA (Rp.)

F. Note: 1 2

3 4

HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-636a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3(6a) PERKIRAAN VOL. PEK. : Laston Lapis Antara (AC-BC) TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.2008 0.0201

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 0 - 5) Semen (M05) Aspal (M10)

M3 M3 Kg Kg

0.3481 0.3127 9.4500 66.6400

308,439.30 420,978.60 1,500.00 12,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0109 0.0201 0.0201 1.1131 0.0110 0.0108 0.0046 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-636b FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3(6b) PERKIRAAN VOL. PEK. : Laston Lapis Antara Modifikasi (AC-BC TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.2008 0.0201

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 0 - 5) Filler Added Aspal modifikasi (M10)

M3 M3 Kg Kg

0.3443 0.3092 9.3450 68.2890

308,439.30 420,978.60 1,500.00 8,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0201 0.8542 0.0110 0.0108 0.0046 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan.

2

3 4

Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-636c FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3(6c) PERKIRAAN VOL. PEK. : Laston Lapis Antara Perata (AC-BC(L)) TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.2008 0.0201

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 0 - 5) Semen (M05) Aspal (M10)

M3 M3 Kg Kg

0.3481 0.3127 9.4500 57.6800

308,439.30 420,978.60 1,500.00 12,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0201 0.8542 0.0110 0.0108 0.0046 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-636d FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3(6d) PERKIRAAN VOL. PEK. : Laston Lapis Antara Modifikasi Perata TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.2008 0.0201

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 0 - 5) Filler Added (M05) Aspal Modifikasi (M10)

M3 M3 Kg Kg

0.3443 0.3092 9.3450 68.2890

308,439.30 420,978.60 1,500.00 8,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0201 0.8542 0.0110 0.0108 0.0046 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan.

2

3 4

Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-637a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3(7a) PERKIRAAN VOL. PEK. : Laston Lapis Pondasi (AC-Base) TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.2008 0.0201

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1 2 3 3 4

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 5 - 9,5) Lolos screen2 ukuran ( 0 - 5) Semen (M05) Aspal (M10)

M3 M3 M3 Kg Kg

0.1316 0.2981 0.2416 9.9750 49.4400

228,054.09 308,439.30 420,978.60 1,500.00 12,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0201 0.8542 0.0092 0.0090 0.0052 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-637b FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3(7b) PERKIRAAN VOL. PEK. : Laston Lapis Pondasi Modifikasi (AC-B TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.2008 0.0201

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4 5

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 5 - 9,5) Lolos screen2 ukuran ( 0 - 5) Filler Added (M05) Aspal Modifikasi (M10)

M3 M3 M3 Kg Kg

0.1304 0.2953 0.2394 9.8700 58.7100

228,054.09 308,439.30 420,978.60 1,500.00 8,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

D. E.

JUMLAH HARGA PERALATAN JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0173 0.0201 0.0201 0.8542 0.0092 0.0090 0.0052 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

: : :

JUMLAH HARGA (Rp.)

F.

HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-637c FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3(7c) PERKIRAAN VOL. PEK. : Laston Lapis Pondasi Perata (AC-Base(LTOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.2008 0.0201

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1 2 3 4 5

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 5 - 9,5) Lolos screen2 ukuran ( 0 - 5) Semen (M05) Aspal (M10)

M3 M3 M3 Kg Kg

0.1316 0.2981 0.2416 9.9750 49.4400

228,054.09 308,439.30 420,978.60 1,500.00 12,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0201 0.8542 0.0092 0.0090 0.0052 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-637d FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.3(7d) PERKIRAAN VOL. PEK. : Laston Lapis Pondasi Modifikasi Perat TOTAL HARGA (Rp.) : Ton % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.2008 0.0201

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4 5

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 5 - 9,5) Lolos screen2 ukuran ( 0 - 5) Filler Added (M05) Aspal Modifikasi (M10)

M3 M3 M3 Kg Kg

0.1304 0.2953 0.2394 9.8700 58.7100

228,054.09 308,439.30 420,978.60 1,500.00 8,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E08 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0173 0.0201 0.0201 0.8542 0.0092 0.0090 0.0052 1.0000

533,941.26 5,782,563.38 411,499.20 287,873.37 902,423.18 457,658.59 424,352.69 0.00

JUMLAH HARGA PERALATAN D.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

: : :

JUMLAH HARGA (Rp.)

E. F. Note: 1 2

3 4

OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-65 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.5.(1) PERKIRAAN VOL. PEK. : Campuran Aspal Dingin untuk PelapisanTOTAL HARGA : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

jam jam

HARGA SATUAN (Rp.)

1.0000 0.0833

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Lolos screen2 ukuran ( 0 Aspal Emulsi

(M04) (M31)

M3 Kg

1.3488 153.3000

420,978.60 12,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4.

Conc. Mixer Tandem Roller Dump Truck Alat Bantu

E06 E17 E09

jam jam jam Ls

0.0833 0.0241 0.6060 1.0000

175,230.07 457,658.59 495,785.15 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-661 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.6.(1) PERKIRAAN VOL. PEK. : Lapis Permukaan Penetrasi Macadam TOTAL HARGA : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.1417 0.0142

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3

Agregat Kasar Agregat Halus Aspal

(M03) (M04) (M10)

M3 M3 Kg

1.6690 0.1479 98.5857

308,439.30 420,978.60 12,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4. 5.

Wheel Loader Dump Truck 3-Wheel Roller Asp. Sprayer Alat bantu

E15 E09 E16 E03

Jam Jam Jam Jam Ls

0.0071 0.4230 0.0435 0.3788 1.0000

533,941.26 495,785.15 217,811.32 72,784.89 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-662 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.6.(2) PERKIRAAN VOL. PEK. : Lapis Pondasi/Perata Penetrasi Macad TOTAL HARGA : M3 % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.1417 0.0142

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3

Agregat Kasar Agregat Halus Aspal

(M03) (M04) (M10)

M3 M3 Kg

1.7746 0.2465 103.0000

308,439.30 420,978.60 12,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4. 5.

Wheel Loader Dump Truck 3-Wheel Roller Asp. Sprayer Alat bantu

E15 E09 E16 E03

Jam Jam Jam Jam Ls

0.0071 0.3491 0.0406 0.3788 1.0000

533,941.26 495,785.15 217,811.32 72,784.89 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-611a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.1 (1)(b) PERKIRAAN VOL. PEK. : Lapis Resap Pengikat - Aspal Emulsi TOTAL HARGA (Rp.) : Liter % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0021 0.0004

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Aspal Emulsi

(M31)

Kg

1.0403

12,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Asp. Distributor Compressor

E41 E05

Jam Jam

0.0002 0.0002

384,601.49 172,621.19

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-611a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.1 (2)(b) PERKIRAAN VOL. PEK. : Lapis Perekat - Aspal Emulsi TOTAL HARGA (Rp.) : Liter % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0021 0.0004

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2

Aspal Emulsi Air

(M31)

Kg Liter

0.5202 1.0000

12,000.00 0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3

Asphalt Distributor Compressor Asphalt Liquid Mixer

E41 E05 E34

Jam Jam Jam

0.0002 0.0002 0.0250

384,601.49 172,621.19 52,063.89

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-611a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.1 (2)(c) PERKIRAAN VOL. PEK. : Lapis Perekat - Aspal Emulsi Modifikasi TOTAL HARGA (Rp.) : Liter % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0021 0.0004

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2

Aspal Emulsi Bahan Modifikasi

(M31) (M67)

Kg Kg

1.0216 0.0182

12,000.00 1,160.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Asp. Distributor Compressor

E41 E05

Jam Jam

0.0002 0.0002

384,601.49 172,621.19

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

: : :

JUMLAH HARGA (Rp.)

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-623a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.2 (3a) PERKIRAAN VOL. PEK. : Bahan Aspal untuk Pekerjaan PelaburanTOTAL HARGA (Rp.) : Liter % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0021 0.0004

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2

Aspal Kerosene

(M10) (M11)

Kg Ltr

0.9760 0.0659

12,000.00 8,383.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Asp. Distributor Compresor

E41 E05

Jam Jam

0.0002 0.0002

384,601.49 172,621.19

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-623a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.2 (3b) PERKIRAAN VOL. PEK. : Bahan Aspal Modifikasi untuk PekerjaanTOTAL HARGA (Rp.) : Liter % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

0.0021 0.0004

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Aspal Modifikasi

2

Kerosene

(M10a)

Kg

0.9876

0.00

(M11)

Ltr

0.0494

8,383.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Asp. Distributor Compresor

E41 E05

Jam Jam

0.0002 0.0002

384,601.49 172,621.19

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-612a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.2 (4a) PERKIRAAN VOL. PEK. : Aspal Cair Emulsi untuk Precoated TOTAL HARGA (Rp.) : Liter % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

1.0000 0.2000

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Aspal Kerosene

(M10) (M11)

Kg liter

0.9760 0.0659

12,000.00 8,383.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Pan Mixer

E41

Jam

0.0010

645,958.07

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

: : :

JUMLAH HARGA (Rp.)

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-611a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.2 (4b) PERKIRAAN VOL. PEK. : Aspal Emulsi untuk Precoated TOTAL HARGA (Rp.) : Liter % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

2.0000 0.4000

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2

Aspal Emulsi Kerosene

(M31) (M11)

Kg Liter

0.9779 0.0494

12,000.00 8,383.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Pan Mixer

E43

Jam

0.0010

645,958.07

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

: : :

JUMLAH HARGA (Rp.)

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-611a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 6.2 (4c) PERKIRAAN VOL. PEK. : Aspal Emulsi Modifikasi untuk PrecoatedTOTAL HARGA (Rp.) : Liter % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

HARGA SATUAN (Rp.)

2.0000 0.4000

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2 3

Aspal Emulsi Kerosene Bahan Modifikasi

(M31) (M11) (M67)

Kg Liter Kg

0.9571 0.0624 0.0190

12,000.00 1,160.00 1,160.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Pan Mixer

E43

Jam

0.0010

645,958.07

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-611a

AN

1.00 16,809.00 0.00

JUMLAH HARGA (Rp.)

33.61 6.72

40.34

10,875.65 3,591.28

14,466.93

75.41 33.85

109.26

14,616.52 2,192.48 16,809.00 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-612a

AN

1.00 20,852.76 0.00

JUMLAH HARGA (Rp.)

571.43 114.29

685.71

13,594.56 1,995.15

15,589.71

1,282.00 575.40

1,857.41

18,132.84 2,719.93 20,852.76 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-621

AN

1.00 52,854.70 0.01

JUMLAH HARGA (Rp.)

3,037.36 182.24

3,219.60

27,600.00

27,600.00

5,676.20 9,226.30 228.50 10.00

15,141.00

45,960.60 6,894.09 52,854.70 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-622

AN

1.00 82,404.94 0.01

JUMLAH HARGA (Rp.)

5,062.27 303.74

5,366.00

42,000.00

42,000.00

9,460.33 14,373.13 457.00 0.00

24,290.47

71,656.47 10,748.47 82,404.94 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-631

AN

1.00 76,061.31 0.01

JUMLAH HARGA (Rp.)

66.27 11.36

77.62

1,794.28 3,225.16 1,559.25 40,788.00

47,366.68

138.75 3,831.82 272.68 8,114.43 1,150.54 574.37 4,613.38 0.00 18,695.96 66,140.27 9,921.04 76,061.31

n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-632

AN

1.00 1,362,749.63 0.17

JUMLAH HARGA (Rp.)

88.35 15.15

103.50

3,629.80 3,262.23 47,250.00 1,112,400.00

1,166,542.03

185.00 5,109.09 363.57 10,819.24 1,150.54 574.37 152.33 0.00 18,354.15

1,184,999.68 177,749.95 1,362,749.63 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-633a

AN

1.00 1,671,189.76 0.21

JUMLAH HARGA (Rp.)

1,905.74 326.70

2,232.44

75,263.53 64,755.62 58,133.68 34,650.00 902,280.00

1,135,082.84

5,110.56 116,115.73 8,263.04 160,215.24 17,197.85 7,162.50 1,828.30 0.00 315,893.21 1,453,208.49 217,981.27

1,671,189.76 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-633a

AN

1.00 1,671,189.76 0.21

JUMLAH HARGA (Rp.)

1,905.74 326.70

2,232.44

75,263.53 64,755.62 58,133.68 34,650.00 902,280.00

1,135,082.84

5,110.56 116,115.73 8,263.04 160,215.24 17,197.85 7,162.50 1,828.30 0.00 315,893.21 1,453,208.49 217,981.27 1,671,189.76

n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-634a

AN

1.00 1,462,596.80

0.18

JUMLAH HARGA (Rp.)

408.37 70.01

478.38

91,228.52 59,124.70 53,078.58 23,625.00 741,600.00 968,656.80

5,110.56 116,115.73 8,263.04 160,215.24 3,685.25 7,208.83 2,089.48 0.00 302,688.12

1,271,823.31 190,773.50 1,462,596.80 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-634b

AN

1.00 1,462,596.80

0.18

JUMLAH HARGA (Rp.)

408.37 70.01

478.38

91,228.52 59,124.70 53,078.58 23,625.00 741,600.00 968,656.80

5,110.56 116,115.73 8,263.04 160,215.24 3,685.25 7,208.83 2,089.48 0.00 302,688.12

1,271,823.31 190,773.50 1,462,596.80 n, volume dan/atau ukuran

aikan satu satuan pekerjaan

tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-635a

AN

1.00 1,881,401.39 0.23

JUMLAH HARGA (Rp.)

2,868.62 344.23

3,212.85

100,807.52 135,142.17 29,925.00 842,520.00

1,108,394.69

6,272.04 116,115.73 8,263.04 372,693.21 12,398.02 6,189.34 2,462.28 0.00 524,393.66 1,636,001.21 245,400.18 1,881,401.39

n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-635b

AN

1.00 1,241,514.20 0.15

JUMLAH HARGA (Rp.)

2,868.62 344.23

3,212.85

91,775.90 148,149.61 14,805.00 510,880.00

765,610.50

5,110.56 116,115.73 8,263.04 160,215.24 12,398.02 6,189.34 2,462.28 0.00

310,754.21

1,079,577.56 161,936.63 1,241,514.20 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

odifikasi polimer

) - Asbuton semi ekstraksi

Analisa EI-635c

AN

1.00 1,521,355.37 0.19

JUMLAH HARGA (Rp.)

2,868.62 344.23

3,212.85

91,867.12 148,318.54 14,805.00 753,960.00

1,008,950.66

5,110.56 116,115.73 8,263.04 160,215.24 12,398.02 6,189.34 2,462.28 0.00 310,754.21 1,322,917.72 198,437.66 1,521,355.37

n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-635d

AN

1.00 1,334,073.47 0.17

JUMLAH HARGA (Rp.)

2,868.62 344.23

3,212.85

90,772.38 146,572.95 14,647.50 594,104.00

846,096.83

5,110.56 116,115.73 8,263.04 160,215.24 12,398.02 6,189.34 2,462.28 0.00

310,754.21 1,160,063.89 174,009.58

1,334,073.47 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

AN

Analisa EI-636a

1.00 1,752,055.64

0.22

JUMLAH HARGA (Rp.)

2,868.62 344.23

3,212.85

107,379.53 131,622.85 14,175.00 799,680.00

1,052,857.38

5,807.45 116,115.73 8,263.04 320,430.48 9,918.42 4,951.47 1,969.83 0.00 467,456.41

1,523,526.64 228,529.00 1,752,055.64 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang

ai dan operator. (tetapi tidak termasuk PPN

AN

Analisa EI-636b

1.00 1,370,982.05

0.17

JUMLAH HARGA (Rp.)

2,868.62 344.23

3,212.85

106,208.12 130,186.96 14,017.50 546,312.00

796,724.58

5,110.56 116,115.73 8,263.04 245,891.84 9,918.42 4,951.47 1,969.83 0.00

392,220.88

1,192,158.31 178,823.75 1,370,982.05 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

AN

Analisa EI-636c

1.00 1,541,886.77

0.19

JUMLAH HARGA (Rp.)

2,868.62 344.23

3,212.85

107,379.53 131,622.85 14,175.00 692,160.00

945,337.38

5,110.56 116,115.73 8,263.04 245,891.84 9,918.42 4,951.47 1,969.83 0.00 392,220.88

1,340,771.11 201,115.67 1,541,886.77 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator.

(tetapi tidak termasuk PPN

AN

Analisa EI-636d

1.00 1,370,982.05

0.17

JUMLAH HARGA (Rp.)

2,868.62 344.23

3,212.85

106,208.12 130,186.96 14,017.50 546,312.00

796,724.58

5,110.56 116,115.73 8,263.04 245,891.84 9,918.42 4,951.47 1,969.83 0.00

392,220.88

1,192,158.31 178,823.75 1,370,982.05 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

AN

Analisa EI-637a

1.00 1,408,881.32

0.18

JUMLAH HARGA (Rp.)

2,868.62 344.23

3,212.85

30,016.41 91,958.35 101,722.64 14,962.50 593,280.00 831,939.91

5,110.56 116,115.73 8,263.04 245,891.84 8,265.35 4,126.23 2,188.70 0.00 389,961.43

1,225,114.19 183,767.13 1,408,881.32 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang

ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-637b

AN

1.00 1,268,893.48

0.16

JUMLAH HARGA (Rp.)

2,868.62 344.23

3,212.85

29,729.74 91,091.68 100,765.38 14,805.00 469,680.00 706,071.81

9,250.10 116,115.73 8,263.04 245,891.84 8,265.35 4,126.23 2,188.70 0.00

394,100.98 1,103,385.64 165,507.85

1,268,893.48

n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-637c

AN

1.00 1,408,881.32

0.18

JUMLAH HARGA (Rp.)

2,868.62 344.23

3,212.85

30,016.41 91,958.35 101,722.64 14,962.50 593,280.00 831,939.91

5,110.56 116,115.73 8,263.04 245,891.84 8,265.35 4,126.23 2,188.70 0.00 389,961.43

1,225,114.19 183,767.13 1,408,881.32 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-637d

AN

1.00 1,268,893.48

0.16

JUMLAH HARGA (Rp.)

2,868.62 344.23

3,212.85

29,729.74 91,091.68 100,765.38 14,805.00 469,680.00 706,071.81

9,250.10 116,115.73 8,263.04 245,891.84 8,265.35 4,126.23 2,188.70 0.00

394,100.98 1,103,385.64

165,507.85 1,268,893.48 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

AN

Analisa EI-65

1.00 3,161,615.01

0.39

JUMLAH HARGA (Rp.)

14,285.71 1,428.57

15,714.29

567,819.28 1,839,600.00

2,407,419.28

14,602.51 11,027.92 300,466.46 0.00

326,096.88

2,749,230.44 412,384.57 3,161,615.01 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

AN

Analisa EI-661

1.00 2,314,833.05 0.29

JUMLAH HARGA (Rp.)

2,024.91 242.99

2,267.90

514,789.53 62,257.40 1,183,028.57

1,760,075.50

3,784.13 209,729.83 9,470.92 27,570.03 0.00

250,554.91

2,012,898.30 301,934.75 2,314,833.05 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-662

AN

1.00 2,418,056.06 0.30

JUMLAH HARGA (Rp.)

2,024.91 242.99

2,267.90

547,371.15 103,762.33 1,236,000.00

1,887,133.48

3,784.13 173,062.38 8,839.52 27,570.03 0.00

213,256.07

2,102,657.44 315,398.62 2,418,056.06 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-611a

AN

1.00 14,532.08 0.00

JUMLAH HARGA (Rp.)

29.76 7.14

36.90

12,483.60

12,483.60

80.13 35.96

116.09

12,636.59 1,895.49 14,532.08 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-611a

AN

1.00 8,850.85 0.00

JUMLAH HARGA (Rp.)

29.76 7.14

36.90

6,241.80 0.00

6,241.80

80.13 35.96 1,301.60

1,417.69

7,696.39 1,154.46 8,850.85 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-611a

AN

1.00 14,297.96 0.00

JUMLAH HARGA (Rp.)

29.76 7.14

36.90

12,258.90 21.12

12,280.01

80.13 35.96

116.09 12,433.01 1,864.95 14,297.96

n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-623a

AN

1.00 14,280.63 0.00

JUMLAH HARGA (Rp.)

29.76 7.14

36.90

11,712.34 552.61

12,264.94

80.13 35.96

116.09

12,417.94 1,862.69 14,280.63 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-623a

AN

1.00 652.57 0.00

JUMLAH HARGA (Rp.)

29.76 7.14

36.90

0.00 414.46

414.46

80.13 35.96

116.09

567.45 85.12 652.57 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-612a

AN

1.00 35,198.33 0.00

JUMLAH HARGA (Rp.)

14,285.71 3,428.57

17,714.29

11,712.34 552.61

12,264.94

628.01

628.01 30,607.24 4,591.09 35,198.33

n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-611a

AN

1.00 55,436.47 0.01

JUMLAH HARGA (Rp.)

28,571.43 6,857.14

35,428.57

11,734.58 414.46

12,149.04

628.01

628.01 48,205.63 7,230.84 55,436.47

n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa EI-611a

AN

1.00 54,781.27 0.01

JUMLAH HARGA (Rp.)

28,571.43 6,857.14

35,428.57

11,484.91 72.40 21.98

11,579.30

628.01

628.01

47,635.89 7,145.38 54,781.27 n, volume dan/atau ukuran

aikan satu satuan pekerjaan tidak dapat diubah kecuali uksi Kepada Peserta Lelang ai dan operator. (tetapi tidak termasuk PPN

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado :7.1 (2) PERKIRAAN VOL. PEK. :Beton mutu tinggi fc’=45 Mpa TOTAL HARGA (Rp.) :M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

: : :

HARGA SATUAN (Rp.)

0.8032 1.8072 0.1004

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4. 5.

Semen Pasir Beton Agregat Kasar Kayu Perancah

Paku

(M12) (M01a) (M03) (M19) (M18)

Kg M3 M3 M3 Kg

595.3400 0.4345 0.7440 0.4000 4.8000

1,269.98 260,700.00 337,983.91 2,200,000.00 20,220.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4

Con. Pan. Mixer Truck Mixer Water Tang Truck Alat Bantu

(E43) (E49) (E23)

jam jam jam Ls

0.1004 0.6431 0.0382 1.0000

645,958.07 651,706.64 243,811.40 170,000.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

JU H

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado :7.1 (4) PERKIRAAN VOL. PEK. :Beton mutu tinggi fc’=35 Mpa TOTAL HARGA (Rp.) :M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

: : :

HARGA SATUAN (Rp.)

0.8032 1.8072 0.1004

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4. 5.

Semen Pasir Beton Agregat Kasar Kayu Perancah

Paku

(M12) (M01a) (M03) (M19) (M18)

Kg M3 M3 M3 Kg

492.3400 0.5024 0.7440 0.4000 4.8000

1,269.98 260,700.00 337,983.91 2,200,000.00 20,220.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4

Con Pan Mixer Truck Mixer Water Tanker Alat Bantu

E43 E49 E23

jam jam jam Ls

0.1004 0.6431 0.0382 1.0000

645,958.07 651,706.64 243,811.40 140,000.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

JU H

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado :7.1 (5) a PERKIRAAN VOL. PEK. :Beton mutu sedang fc’=30 MPa lantai jembaTOTAL HARGA (Rp.) :M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

: : :

HARGA SATUAN (Rp.)

0.8032 1.8072 0.1004

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4. 5.

Semen Pasir Beton Agregat Kasar Kayu Perancah

Paku

(M12) (M01a) (M03) (M19) (M18)

Kg M3 M3 M3 Kg

469.6800 0.5145 0.7440 0.4000 3.2000

1,269.98 260,700.00 337,983.91 2,200,000.00 20,220.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4.

Pan. Mixer Truk Mixer Water Tanker Alat Bantu

E43 E49 E23

jam jam jam Ls

0.1004 0.8439 0.0382 1.0000

645,958.07 651,706.64 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

JU H

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado :7.1 (6) PERKIRAAN VOL. PEK. :Beton mutu sedang fc’= 25 Mpa TOTAL HARGA (Rp.) :M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

: : :

HARGA SATUAN (Rp.)

0.8032 1.1044 0.1004

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4. 5.

Semen Pasir beton Agregat Kasar Kayu Perancah

Paku

(M12) (M01a) (M03) (M19) (M18)

Kg M3 M3 M3 Kg

469.6800 0.5097 0.7440 0.2000 1.6000

1,269.98 260,700.00 337,983.91 2,200,000.00 20,220.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4.

Con Pan Mixer Truck Mixer Water Tanker Alat Bantu

(E43) (E49) (E23)

jam jam jam Ls

0.1004 0.8439 0.0382 1.0000

645,958.07 651,706.64 243,811.40 90,000.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

JU H

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado :7.1 (7) a PERKIRAAN VOL. PEK. :Beton mutu sedang fc’= 20 MPa TOTAL HARGA (Rp.) :M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

(L01) (L02) (L03)

jam jam jam

: : :

HARGA SATUAN (Rp.)

0.8032 1.1044 0.1004

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4. 5.

Semen Pasir beton Agregat Kasar Kayu Perancah

Paku

(M12) (M01a) (M03) (M19) (M18)

Kg M3 M3 M3 Kg

422.3000 0.5412 0.7440 0.2000 1.6000

1,269.98 260,700.00 337,983.91 2,200,000.00 20,220.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4.

Con Pan. Mixer Truck Mixer Water Tanker Alat Bantu

E43 E49 E23

jam jam jam Ls

0.1004 0.8439 0.0382 1.0000

645,958.07 651,706.64 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

JU H

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado :7.1 (8) PERKIRAAN VOL. PEK. :Beton mutu rendah fc’= 15 MPa TOTAL HARGA (Rp.) :M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

: : :

HARGA SATUAN (Rp.)

3.8956 3.8956 1.9478

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4. 5.

Semen Pasir beton Agregat Kasar Kayu Perancah

Paku

(M12) (M01a) (M03) (M19) (M18)

Kg M3 M3 M3 Kg

327.5400 0.5024 0.9053 0.2801 2.2408

1,269.98 260,700.00 337,983.91 2,200,000.00 20,220.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Conc. Mixer Water Tanker Alat Bantu

E06 E23

jam jam Ls

1.9478 0.0382 1.0000

175,230.07 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

JU H

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado :7.1 (9) PERKIRAAN VOL. PEK. :Beton Siklop fc’=15 Mpa TOTAL HARGA (Rp.) :M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

: : :

HARGA SATUAN (Rp.)

10.9880 0.9157 0.9157

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4.

Semen Pasir beton Agregat Kasar Batu Belah

(M12) (M01a) (M03) (M06)

Kg M3 M3 M3

229.2780 0.3517 0.6337 0.6518

1,269.98 260,700.00 337,983.91 262,400.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4.

Conc. Mixer Water Tanker Con. Vibrator Alat Bantu

E06 E23 E20

jam jam jam Ls

0.9157 0.0382 0.9157 1.0000

175,230.07 243,811.40 53,568.78 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

JU H

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado :7.1 (10) PERKIRAAN VOL. PEK. :Beton mutu rendah fc’= 10 Mpa TOTAL HARGA (Rp.) :M3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

: : :

HARGA SATUAN (Rp.)

1.3655 1.3655 0.6827

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4 5

Semen Pasir beton Agregat Kasar Kayu Perancah

Paku

(M12) (M01a) (M03) (M19) (M18)

Kg M3 M3 M3 Kg

311.0600 0.5113 0.9053 0.0500 0.4000

1,269.98 260,700.00 337,983.91 2,200,000.00 20,220.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Conc. Mixer Water Tanker Alat Bantu

E06 E23

jam jam Ls

0.6827 0.0382 1.0000

175,230.07 243,811.40 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

JU H

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.2 (1a) PERKIRAAN VOL. PEK. : Penyediaan Unit Pracetak Gelagar Tipe 1 BTOTAL HARGA (Rp.) : Buah % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

PERKIRAAN

HARGA

JU

SATUAN KUANTITAS

SATUAN

H

(Rp.)

A.

TENAGA

JUMLAH HARGA TENAGA

B.

BAHAN

1.

Pracetak Gelagar Tipe I bentang 16 meter

buah

1.0000

15,000,000.00

JUMLAH HARGA BAHAN C.

: : :

PERALATAN

JUMLAH HARGA PERALATAN

D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.2 (1b) PERKIRAAN VOL. PEK. : Penyediaan Unit Pracetak Gelagar Tipe 1 BTOTAL HARGA (Rp.) : Buah % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

PERKIRAAN

HARGA

JU

SATUAN KUANTITAS

SATUAN

H

(Rp.)

A.

TENAGA

JUMLAH HARGA TENAGA

B.

BAHAN

1.

Pracetak Gelagar Tipe I bentang 16 meter

buah

1.0000

20,000,000.00

JUMLAH HARGA BAHAN C.

: : :

PERALATAN

JUMLAH HARGA PERALATAN

D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.2 (1c) PERKIRAAN VOL. PEK. : Unit Pracetak Gelagar I Penyediaan Unit P TOTAL HARGA (Rp.) : Buah 00 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

PERKIRAAN

HARGA

JU

SATUAN KUANTITAS

SATUAN

H

(Rp.)

A.

TENAGA

JUMLAH HARGA TENAGA

B.

BAHAN

1.

Pracetak Gelagar Tipe I bentang 16 meter

buah

1.0000

JUMLAH HARGA BAHAN C.

: : :

PERALATAN

JUMLAH HARGA PERALATAN

0.00

D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.2 (1a) PERKIRAAN VOL. PEK. : Unit Pracetak Gelagar I Penyediaan Unit P TOTAL HARGA (Rp.) : Buah % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

PERKIRAAN

HARGA

JU

SATUAN KUANTITAS

SATUAN

H

(Rp.)

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

64.2857 17.8571 3.5714

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA

B.

BAHAN

1. 2 3 4 5

Beton K500 Kabel prategang Tulangan baja (M39b) Anchorage Ducting

M3 kg kg kg M

4.2500 283.9200 566.0100 6.0000 96.0000

2,806,574.63 13,860.00 13,315.00 1,538,460.00 57,750.00

JUMLAH HARGA BAHAN C. 1. 2 3

PERALATAN Crane 1 Crane 2 Alat Bantu

: : :

(E31) (E31) LS

0.9036 0.9036 1.0000

444,273.04 444,273.04 0.00

JUMLAH HARGA PERALATAN

D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.2 (1b) PERKIRAAN VOL. PEK. : Unit Pracetak Gelagar I Penyediaan Unit P TOTAL HARGA (Rp.) : Buah % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

PERKIRAAN

HARGA

JU

SATUAN KUANTITAS

SATUAN

H

(Rp.)

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

18.0000 5.0000 1.0000

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA

B.

BAHAN

1. 2 3 4 5

Beton K500 Kabel prategang Tulangan baja (M39b) Anchorage Ducting

M3 kg kg kg M

6.6406 443.6250 884.3906 9.0000 225.0000

2,806,574.63 13,860.00 13,315.00 1,538,460.00 57,750.00

JUMLAH HARGA BAHAN C. 1. 2 3

PERALATAN Crane 1 Crane 2 Alat Bantu

: : :

(E31) (E31) LS

0.9036 0.9036 1.0000

444,273.04 444,273.04 0.00

JUMLAH HARGA PERALATAN

D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.2 (1c) PERKIRAAN VOL. PEK. : Unit Pracetak Gelagar I Penyediaan Unit P TOTAL HARGA (Rp.) : Buah 00 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

PERKIRAAN

HARGA

JU

SATUAN KUANTITAS

SATUAN

H

(Rp.)

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

18.0000 5.0000 1.0000

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA

B.

BAHAN

1. 2 3 4 5

Beton K500 Kabel prategang Tulangan baja (M39b) Anchorage Ducting

M3 kg kg kg M

9.2969 621.0750 1,238.1469 12.0000 0.0000

2,806,574.63 13,860.00 13,315.00 1,538,460.00 57,750.00

JUMLAH HARGA BAHAN C. 1. 2 3

PERALATAN Crane 1 Crane 2 Alat Bantu

: : :

(E31) (E31) LS

0.9036 0.9036 1.0000

444,273.04 444,273.04 0.00

JUMLAH HARGA PERALATAN

D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.2 (3)a PERKIRAAN VOL. PEK. : Penyediaan Unit Pracetak Gelagar Tipe U TOTAL HARGA (Rp.) : Buah L (m) = 16 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

PERKIRAAN

HARGA

JU

SATUAN KUANTITAS

SATUAN

H

(Rp.)

A.

TENAGA

JUMLAH HARGA TENAGA

B.

BAHAN

1.

Pracetak Gelagar Tipe U bentang 16 meter

buah

1.0000

15,000,000.00

JUMLAH HARGA BAHAN C.

: : :

PERALATAN

JUMLAH HARGA PERALATAN

D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.2 (3)b PERKIRAAN VOL. PEK. : Penyediaan Unit Pracetak Gelagar Tipe U TOTAL HARGA (Rp.) : Buah L (m) = 0 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

PERKIRAAN

HARGA

JU

SATUAN KUANTITAS

SATUAN

H

(Rp.)

A.

TENAGA

JUMLAH HARGA TENAGA

B.

BAHAN

1.

Pracetak Gelagar Tipe U bentang 16 meter

buah

0.0000

JUMLAH HARGA BAHAN C.

: : :

PERALATAN

JUMLAH HARGA PERALATAN

0.00

D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.2 (4)a PERKIRAAN VOL. PEK. : Pemasangan Unit Pracetak Gelagar Tipe U TOTAL HARGA (Rp.) : Buah L (m) = 16 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

PERKIRAAN

HARGA

JU

SATUAN KUANTITAS

SATUAN

H

(Rp.)

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

18.0000 5.0000 1.0000

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA

B.

BAHAN

JUMLAH HARGA BAHAN C. 1. 2 3 3

PERALATAN Crane 1 Crane 2 Jack Hidraulik Alat Bantu

: : :

jam jam jam LS

0.9036 0.9036 1.0000 1.0000

444,273.04 444,273.04 0.00 0.00

JUMLAH HARGA PERALATAN

D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.2 (4)b PERKIRAAN VOL. PEK. : Pemasangan Unit Pracetak Gelagar Tipe U TOTAL HARGA (Rp.) : Buah 00 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

: : :

PERKIRAAN

HARGA

JU

SATUAN KUANTITAS

SATUAN

H

(Rp.)

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

18.0000 5.0000 1.0000

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA

B.

BAHAN

JUMLAH HARGA BAHAN C. 1. 2 3 3

PERALATAN Crane 1 Crane 2 Jack Hidraulik Alat Bantu

jam jam jam LS

0.9036 0.9036 1.0000 1.0000

444,273.04 444,273.04 0.00 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan.

2

3 4

Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.2.(7) PERKIRAAN VOL. PEK. : Baja Prategang TOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

HARGA SATUAN (Rp.)

3.0120 0.3012 0.3012

JU H

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Kabel Prategang

Kg

1.0000

0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Dump Truck Crane Alat Bantu

E08 E07

jam jam jam

0.1205 0.3012 1.0000

287,873.37 625,016.51 0.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

: : :

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

A. 1. 2. 3.

: : ……………………………………………… : ………………………………………………………………….. …………………………………………………………………. : ……………………………………………… : 7.2.(8) PERKIRAAN VOL. PEK. : Penyediaan Pelat Berongga (Voided SlTOTAL HARGA (Rp.) : Buah 5 % THD. BIAYA PROYEK

KOMPONEN

SATUAN

PERKIRAAN HARGA KUANTITAS SATUAN (Rp.)

JUMLAH HARGA (Rp.)

TENAGA Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

12 5 1

14285.7142857143 17857.1428571429 17142.8571428571

JUMLAH HARGA TENAGA B. 1. 2. 3. 4. 5. 6. 7. 8.

BAHAN Beton K400 Tulangan baja Selongsong Kabel baja prategang (strand) Perancah Angkur baut Bahan Grouting Bahan Curing

M3 kg m' kg m3 kg Kg m2

1.368965714 289 5.916 6.38 3.909142857 3 11.27892857 3.909142857

2,663,454.70 11,440.00 0.00 13,860.00 2,200,000.00 0.00 0 0

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6.

PERALATAN Crane Concrete Pump Penarik Kabel (jack) Alat Grouting Alat Bantu

jam Jam jam jam Ls

0.903614458 7.795248968 2.409638554 2.710843373 1

: : :

444,273.04 243,775.21 44,709.71 0 0

JUMLAH HARGA PERALATAN

D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 15 % x D OVERHEAD & PROFIT HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

A. 1. 2. 3.

: : ……………………………………………… : ………………………………………………………………….. …………………………………………………………………. : ……………………………………………… : 7.2.(9) PERKIRAAN VOL. PEK. : Pemasangan Pelat Berongga (Voided STOTAL HARGA (Rp.) : Buah 5 % THD. BIAYA PROYEK

KOMPONEN

SATUAN

PERKIRAAN HARGA KUANTITAS SATUAN (Rp.)

JUMLAH HARGA (Rp.)

TENAGA Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

12 5 1

14285.7142857143 17857.1428571429 17142.8571428571

JUMLAH HARGA TENAGA B. 1. 2. 3. 4. 5. 6. 7. 8.

BAHAN Beton K400 Tulangan baja Selongsong Kabel baja prategang (strand) Perancah Angkur baut Bahan Grouting Bahan Curing

M3 kg m' kg m2 buah Kg m2

2.27128 289 5.916 6.38 4.192 3 11.27892857 4.192

2663454.69991999 11440 0 13860 2200000 0 0 0

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6.

PERALATAN Crane Concrete Pump Penarik Kabel (jack) Alat Grouting Alat Bantu

jam Jam jam jam Ls

0.903614458 4.698420526 2.409638554 2.710843373 1

: : :

625,016.51 243,775.21 44,709.71 0 0

JUMLAH HARGA PERALATAN

D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 15 % x D OVERHEAD & PROFIT HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : Beton Diafragma fc’ 30 MPa termasuk pekePERKIRAAN VOL. PEK. : 7.2.(10) TOTAL HARGA (Rp.) : m3 % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

HARGA SATUAN (Rp.)

9.0361 0.9036 0.9036

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA

B.

BAHAN

1. 2.

- Pracetak K 350 - tulangan

m3 kg

0.1580 31.5900

JUMLAH HARGA BAHAN C.

PERALATAN

0.00 11,000.00

: : :

JU H

1. 2

Crane Alat Bantu

E07

jam jam

0.9036 1.0000

625,016.51 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.3 (1) PERKIRAAN VOL. PEK. :Baja Tulangan U 24 Polos TOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

: : :

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

(L01) (L02) (L03)

jam jam jam

HARGA SATUAN (Rp.)

0.1050 0.0350 0.0350

JU H

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Baja Tulangan (Polos) U24 Kawat Beton

(M39a) (M14)

Kg Kg

1.1000 0.0025

11,440.00 23,100.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.3 (2) PERKIRAAN VOL. PEK. :Baja Tulangan U 32 Polos TOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

(L01) (L02) (L03)

jam jam jam

: : :

HARGA SATUAN (Rp.)

0.1050 0.0350 0.0350

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Baja Tulangan (Polos) U32 Kawat Beton

(M57a) (M14)

Kg Kg

1.1000 0.0200

11,500.00 23,100.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

100.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

JU H

4

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.3 (3) PERKIRAAN VOL. PEK. :Baja Tulangan U 32 Ulir TOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

(L01) (L02) (L03)

jam jam jam

HARGA SATUAN (Rp.)

0.1050 0.0350 0.0350

JU H

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Baja Tulangan (Ulir) D32 Kawat Beton

(M39b) (M14)

Kg Kg

1.1000 0.0200

13,315.00 23,100.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

: : :

0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.3 (4) PERKIRAAN VOL. PEK. :Baja Tulangan U 39 Ulir TOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.1050 0.0350 0.0350

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Baja Tulangan (Ulir) D39 Kawat Beton

(M57b) (M14)

Kg Kg

1.1000 0.0200

13,000.00 23,100.00

: : :

JU H

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

100.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.3 (5) PERKIRAAN VOL. PEK. :Baja Tulangan U 48 Ulir TOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

: : :

JU H

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.1050 0.0350 0.0350

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Baja Tulangan (Ulir) D48 Kawat Beton

(M57c) (M14)

Kg Kg

1.1000 0.0200

13,000.00 23,100.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

200.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.3 (6) PERKIRAAN VOL. PEK. :Anyaman Kawat Yang Dilas (Welded Wire MTOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

(L01) (L02) (L03)

jam jam jam

: : :

HARGA SATUAN (Rp.)

0.2100 0.0700 0.0350

JU H

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Baja Tulangan Kawat Beton

(M57c) (M14)

Kg Kg

1.1000 0.0200

13,815.00 2,200,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.4 (1) a PERKIRAAN VOL. PEK. :Penyediaan Baja Struktur BJ 34 (Titik Leleh TOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

HARGA SATUAN (Rp.)

0.0010 0.0001 0.0001

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Baja Struktur BJ 34 (Titik Leleh 210 MPa)

Buah

1.0000

11,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Tronton Crane Alat Bantu

(E35) (E07)

jam jam Ls

0.0004 0.0001 1.0000

530,728.76 625,016.51 0.00

: : :

JU H

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.4 (2) a PERKIRAAN VOL. PEK. :Pemasangan Baja Struktur BJ 34 (Titik Lele TOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

A.

KOMPONEN

TENAGA

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

: : :

JU H

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.0010 0.0050 0.0201

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Sudah ada

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Tronton Crane Alat Bantu

(E35) (E31)

jam jam Ls

0.0000 0.0010 1.0000

530,728.76 444,273.04 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.4 (1) b PERKIRAAN VOL. PEK. :Penyediaan Baja Struktur BJ 37 (Titik Leleh TOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

: : :

HARGA SATUAN (Rp.)

0.0010 0.0001 0.0001

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Baja Struktur BJ 37 (Titik Leleh 240 MPa)

Buah

1.0000

11,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Tronton Crane Alat Bantu

(E35) (E07)

jam jam Ls

0.0004 0.0001 1.0000

530,728.76 625,016.51 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

JU H

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.4 (2) b PERKIRAAN VOL. PEK. :Pemasangan Baja Struktur BJ 37 (Titik Lele TOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.0010 0.0050 0.0201

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

: : :

JU H

1.

Sudah ada

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Tronton Crane Alat Bantu

(E35) (E31)

jam jam Ls

0.0000 0.0010 1.0000

530,728.76 444,273.04 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK

: : ………………………………………………

NAMA PAKET

: Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.4 (1) c PERKIRAAN VOL. PEK. :Penyediaan Baja Struktur BJ …. (Titik Leleh TOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

: : :

HARGA SATUAN (Rp.)

0.0010 0.0001 0.0001

JU H

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Baja Struktur BJ ……. (Titik Leleh …... MPa)

Buah

1.0000

0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Tronton Crane Alat Bantu

(E35) (E07)

jam jam Ls

0.0004 0.0001 1.0000

530,728.76 625,016.51 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.4 (2) c PERKIRAAN VOL. PEK. :Pemasangan Baja Struktur BJ …. (Titik Lel TOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.0010 0.0050 0.0201

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Sudah ada

: : :

JU H

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Tronton Crane Alat Bantu

(E35) (E31)

jam jam Ls

0.0000 0.0010 1.0000

0.00 444,273.04 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.5 (1) PERKIRAAN VOL. PEK. :Pemasangan jembatan Rangka Baja TOTAL HARGA (Rp.)

: :

Analisa EI-712

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 3,227,560.83 0.40

JUMLAH HARGA (Rp.)

11,474.47 32,271.94 1,721.17 45,467.58

756,066.92 113,284.18 251,460.03 880,000.00 97,056.00 2,097,867.12

64,855.23 419,082.65 9,302.04 170,000.00

663,239.92 2,806,574.63 420,986.19 3,227,560.83 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-714

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 3,062,972.90 0.38

JUMLAH HARGA (Rp.)

11,474.47 32,271.94 1,721.17 45,467.58

625,259.49 130,971.67 251,460.03 880,000.00 97,056.00 1,984,747.19

64,855.23 419,082.65 9,302.04 140,000.00

633,239.92 2,663,454.70 399,518.20 3,062,972.90 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-715a

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 2,985,800.58 0.37

JUMLAH HARGA (Rp.)

11,474.47 32,271.94 1,721.17 45,467.58

596,481.86 134,130.15 251,460.03 880,000.00 64,704.00 1,926,776.04

64,855.23 549,947.44 9,302.04 0.00

624,104.71 2,596,348.33 389,452.25 2,985,800.58 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-716

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 2,530,210.15 0.32

JUMLAH HARGA (Rp.)

11,474.47 19,721.74 1,721.17 32,917.38

596,481.86 132,866.76 251,460.03 440,000.00 32,352.00 1,453,160.65

64,855.23 549,947.44 9,302.04 90,000.00

714,104.71 2,200,182.74 330,027.41 2,530,210.15 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-717a

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 2,366,956.88 0.30

JUMLAH HARGA (Rp.)

11,474.47 19,721.74 1,721.17 32,917.38

536,310.44 141,078.81 251,460.03 440,000.00 32,352.00 1,401,201.28

64,855.23 549,947.44 9,302.04 0.00

624,104.71 2,058,223.38 308,733.51 2,366,956.88 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-718

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 2,327,194.82 0.29

JUMLAH HARGA (Rp.)

55,651.18 69,563.97 33,390.71 158,605.85

415,967.61 130,971.67 305,959.94 616,220.00 45,308.98 1,514,428.19

341,311.58 9,302.04 0.00

350,613.63 2,023,647.67 303,547.15 2,327,194.82 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-719

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 1,352,262.08 0.17

JUMLAH HARGA (Rp.)

156,970.74 16,351.12 15,697.07 189,018.93

291,177.33 91,680.17 214,171.96 171,027.07

768,056.52

160,451.63 9,302.04 49,050.93 0.00

218,804.61 1,175,880.07 176,382.01 1,352,262.08 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-7110

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 1,307,440.85 0.16

JUMLAH HARGA (Rp.)

19,506.60 24,383.25 11,703.96 55,593.80

395,038.42 133,287.89 305,959.94 110,000.00 8,088.00 952,374.25

119,634.99 9,302.04 0.00

128,937.03 1,136,905.08 170,535.76 1,307,440.85 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-721a

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 17,250,000.00

2.15

JUMLAH HARGA

(Rp.)

0.00

15,000,000.00

15,000,000.00

0.00

15,000,000.00 2,250,000.00 17,250,000.00

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-721b

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 23,000,000.00

2.87

JUMLAH HARGA

(Rp.)

0.00

20,000,000.00

20,000,000.00

0.00

20,000,000.00 3,000,000.00 23,000,000.00

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-721c

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

Err:509 Err:509

Err:509

JUMLAH HARGA

(Rp.)

0.00

0.00

0.00

0.00

0.00 0.00 0.00

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-721a

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 17,250,000.00

2.15

JUMLAH HARGA

(Rp.)

918,367.35 318,877.55 61,224.49 1,298,469.39

11,927,942.19 3,935,131.20 7,536,423.15 9,230,760.00 5,544,000.00

38,174,256.54

401,451.54 401,451.54 0.00

802,903.08

40,275,629.01 6,041,344.35 46,316,973.36

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-721b

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 23,000,000.00

2.87

JUMLAH HARGA

(Rp.)

257,142.86 89,285.71 17,142.86 363,571.43

18,637,409.67 6,148,642.50 11,775,661.17 13,846,140.00 12,993,750.00

63,401,603.34

401,451.54 401,451.54 0.00

802,903.08

64,568,077.85 9,685,211.68 74,253,289.53

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-721c

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

JUMLAH HARGA

(Rp.)

257,142.86 89,285.71 17,142.86 363,571.43

26,092,373.54 8,608,099.50 16,485,925.64 18,461,520.00 0.00

69,647,918.68

401,451.54 401,451.54 0.00

802,903.08

70,814,393.19 10,622,158.98 81,436,552.16

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-723a

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 17,250,000.00

2.15

JUMLAH HARGA

(Rp.)

0.00

15,000,000.00

15,000,000.00

0.00

15,000,000.00 2,250,000.00 17,250,000.00

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-723b

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

Err:509 Err:509

Err:509

JUMLAH HARGA

(Rp.)

0.00

0.00

0.00

0.00

0.00 0.00 0.00

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-724a

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 1,341,445.68

0.17

JUMLAH HARGA

(Rp.)

257,142.86 89,285.71 17,142.86 363,571.43

0.00

401,451.54 401,451.54 0.00 0.00

802,903.08

1,166,474.51 174,971.18 1,341,445.68

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

Analisa EI-724b

1.00 1,341,445.68

0.17

JUMLAH HARGA

(Rp.)

257,142.86 89,285.71 17,142.86 363,571.43

0.00

401,451.54 401,451.54 0.00 0.00

802,903.08 1,166,474.51 174,971.18 1,341,445.68

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-727

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 317,989.89

0.04

JUMLAH HARGA (Rp.)

43,029.26 5,378.66 5,163.51 53,571.43

0.00

0.00

34,683.54 188,257.98 0.00

222,941.52 276,512.95 41,476.94 317,989.89

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-728

1.00 21,077,442.26 2.63

JUMLAH HARGA

171428.57142857 89285.714285714 17142.857142857

277857.14285714

3646178.1657436 3306160 0 88426.8 8600114.2857143 0 0 0

15640879.251458

401451.53970582 1900288.4768969 107734.25129088 0 0

2409474.2678936

18328210.662209 2749231.5993313 21077442.26154 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-R327

1.00 23,876,486.30 2.98

JUMLAH HARGA

171428.57142857 89285.714285714 17142.857142857

277857.14285714

6049451.3908343 3306160 0 88426.8 9222400 0 0 0

18666438.190834

564773.95249326 1145358.4640045 107734.25129088 0 0

1817866.6677886

20762162.00148 3114324.300222 23876486.301702 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-7210

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 1,233,924.97

0.15

JUMLAH HARGA (Rp.)

129,087.78 16,135.97 15,490.53 160,714.29

0.00 347,490.00

347,490.00

564,773.95 0.00

564,773.95 1,072,978.24 160,946.74 1,233,924.97

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-731

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 17,671.76 0.00

JUMLAH HARGA (Rp.)

1,500.00 625.00 600.00 2,725.00

12,584.00 57.75

12,641.75

0.00

0.00 15,366.75 2,305.01 17,671.76 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-732

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 18,327.55 0.00

JUMLAH HARGA (Rp.)

1,500.00 625.00 600.00 2,725.00

12,650.00 462.00

13,112.00

100.00

100.00 15,937.00 2,390.55 18,327.55 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-733

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 20,508.53 0.00

JUMLAH HARGA (Rp.)

1,500.00 625.00 600.00 2,725.00

14,646.50 462.00

15,108.50

0.00

0.00 17,833.50 2,675.03 20,508.53 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-734

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 20,225.05 0.00

JUMLAH HARGA (Rp.)

1,500.00 625.00 600.00 2,725.00

14,300.00 462.00

14,762.00

100.00

100.00 17,587.00 2,638.05 20,225.05 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-735

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 20,340.05 0.00

JUMLAH HARGA (Rp.)

1,500.00 625.00 600.00 2,725.00

14,300.00 462.00

14,762.00

200.00

200.00 17,687.00 2,653.05 20,340.05 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

Analisa EI-736

1.00 73,653.48 0.01

JUMLAH HARGA (Rp.)

3,000.00 1,250.00 600.00 4,850.00

15,196.50 44,000.00

59,196.50

0.00

0.00 64,046.50 9,606.98 73,653.48 untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-741a

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 13,012.33

0.00

JUMLAH HARGA (Rp.)

14.34 1.79 1.72

17.86

11,000.00

11,000.00

234.46 62.75 0.00

297.21 11,315.07 1,697.26 13,012.33

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-742a

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 1,028.42

0.00

JUMLAH HARGA (Rp.)

14.34 89.64 344.23

448.22

0.00

0.00 446.06 0.00

446.06 894.28 134.14 1,028.42

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-741b

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 13,012.33

0.00

JUMLAH HARGA (Rp.)

14.34 1.79 1.72

17.86

11,000.00

11,000.00

234.46 62.75 0.00

297.21 11,315.07 1,697.26 13,012.33

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-742b

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 1,028.42

0.00

JUMLAH HARGA (Rp.)

14.34 89.64 344.23

448.22

0.00

0.00 446.06 0.00

446.06 894.28 134.14 1,028.42

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

Analisa EI-741c

1.00 362.33

0.00

JUMLAH HARGA (Rp.)

14.34 1.79 1.72

17.86

0.00

0.00

234.46 62.75 0.00

297.21 315.07 47.26 362.33

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-742c

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

0.00 1,028.42

0.00

JUMLAH HARGA (Rp.)

14.34 89.64 344.23

448.22

0.00

0.00 446.06 0.00

446.06 894.28 134.14 1,028.42

untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

etiap komponen untuk menyelesaikan satu satuan pekerjaan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-751

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

1.00 1,161.82

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (1) : Fondasi Cerucuk Penyedian dan Pema : M1

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

2.5000 0.5000 0.2500 JUMLAH HARGA TENAGA

B.

BAHAN

1.

Cerucuk

M61

M1

1.0000

JUMLAH HARGA BAHAN C.

PERALATAN

1

Alat Bantu

Ls

1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (2) :Dinding Turap Kayu Tanpa Pengawetan : M1

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

3.3333 0.6667 0.3333

JUMLAH HARGA TENAGA B.

BAHAN

1.

Cerucuk

M61

M1

1.0000

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (3) : Dinding Turap Kayu Dengan Pengaweta : M1

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

4.0000 0.6667 0.3333

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Bahan tiang pancang kayu Bahan pengawet: kreosot

M1 liter

1.0000 0.2500

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (4) : Dinding Turap Baja : M1

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.0037 0.0012 0.0003

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Turap baja Plat Baja Kawat Las

M52 M48 M51

Kg Kg Dos

1.0500 0.2100 0.0500

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4. 5.

Trailer Crane 1 Crane 2 Welding Set Alat Bantu

E29 E07 E07 E32

jam jam jam jam Ls

0.0001 0.0001 0.0001 0.0004 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (8) a :Penyediaan Tiang Pancang Baja Diamet : M1

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

7.0000 2.3333 0.5833

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Pipa baja Plat Baja

M52 M48

Kg Kg

1.0500 0.2111

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4

Trailer Crane Welding Set Alat Bantu

E29 E07 E32

jam jam jam Ls

0.0001 0.0001 0.0003 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (8) b : Penyediaan Tiang Pancang Baja Diame :M1

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

7.0000 2.3333 0.5833

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Pipa baja Plat Baja

M52 M48

Kg Kg

1.0500 0.2111

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4

Trailer Crane Welding Set Alat Bantu

E29 E07 E32

jam jam jam Ls

0.0001 0.0001 0.0003 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (8) c : Penyediaan Tiang Pancang Baja Diamet : M1

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

8.4000 2.8000 0.7000

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Pipa baja Plat Baja

M52 M48

Kg Kg

1.0500 0.2100

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4

Trailer Crane Welding Set Alat Bantu

E29 E07 E32

jam jam jam Ls

0.0001 0.0001 0.0002 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (13) : Pemancangan Tiang Pancang Kayu Uk :M1 0

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

3.6145 0.9036 0.4518

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Pile Driver Alat Bantu

E30

jam Ls

0.4518 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (14) a : Pemancangan Tiang Pancang Baja Dia :M1 (Dia 500 mm)

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

1.2048 0.3012 0.1506

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Pile Driver Alat Bantu

E30

jam Ls

0.1506 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (14) b : Pemancangan Tiang Pancang Baja Dia :M1 0

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

1.2048 0.3012 0.1506

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Pile Driver Alat Bantu

E30

jam Ls

0.1506 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (6) : Penyediaan Tiang Pancang Kayu Tanp : M1

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

3.3333 0.6667 0.3333

JUMLAH HARGA TENAGA B.

BAHAN

1.

Cerucuk

M61

M1

1.0000

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (7) : Penyediaan Tiang Pancang Kayu deng : M1

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

4.0000 0.6667 0.3333

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Bahan tiang pancang kayu Bahan pengawet: kreosot

M1 liter

1.0000 0.2500

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.9.(1) : Pasangan Batu : M3

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

(L01) (L02) (L03)

jam jam jam

1.0988 0.2747 0.1373 JUMLAH HARGA TENAGA

B.

BAHAN

1. 2. 3.

Batu Kali Semen (PC) Pasir

(M02) (M12) (M01)

M3 Kg M3

1.0725 176.0000 0.5088

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Conc. Mixer Water Tanker Alat Bantu

(E06) (E23)

jam jam Ls

0.1373 0.0014 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.10 (1) : Pasangan Batu Kosong Yang Diisi Aduk : M3

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

(L01) (L02) (L03)

jam jam jam

6.8273 2.0482 0.6827 JUMLAH HARGA TENAGA

B.

BAHAN

1. 2. 3. 4.

Semen (PC) Pasir Agregat Kasar Batu Belah

(M12) (M01) (M03) (M06)

Zak M3 M3 M3

2 0.2181 0.2829 1.3200

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Conc. Mixer Water Tanker Alat Bantu

(E06) (E23)

jam jam Ls

0.6827 0.0014 1.0000

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.10 (2) : Pasangan Batu Kosong : M3

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

(L01) (L02) (L03)

jam jam jam

5.2500 1.7500 0.8750 JUMLAH HARGA TENAGA

B.

BAHAN

1.

Batu Belah

(M06)

M3

1.1000

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.10.(3) a. : Bronjong dengan kawat yang dilapisi gal : M3

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

(L01) (L02) (L03)

jam jam jam

5.2500 2.6250 0.8750 JUMLAH HARGA TENAGA

B.

BAHAN

1. 2.

Bronjong dengan kawat dilapisi galvanis Batu

(M02)

Kg M3

15.0000 1.1000

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.13.(1) : Sandaran (Railing) : M1

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

1.68 0.56 0.28

JUMLAH HARGA TENAGA

B.

BAHAN

1. 2.

Pipa d = 8.91 cm Galvanised Dudukan, mur, baut dll

M

1.00 0.75

JUMLAH HARGA BAHAN

C.

PERALATAN

1.

Alat bantu

LS

1.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.14.(1) : Papan Nama Jembatan : buah

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

14.00 0.00 7.00

JUMLAH HARGA TENAGA

B.

BAHAN

1. 2.

Marmer Adukan Semen

m2 Ls

0.75 0.10

JUMLAH HARGA BAHAN

C.

PERALATAN

1.

Alat bantu

LS

1.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.15.(2) : Pembongkaran Beton : M3

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

12.5000 1.0417

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5

PERALATAN Compressor Jack Hammer Wheel Loader Dump Truck Alat bantu

E05 E26 E15 E08

Jam Jam Jam Jam Ls

1.0417 1.0417 0.0101 0.5854 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kot : 7.15.(5) : Pembongkaran Rangka Baja : M2

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

5.3333 0.6667

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5

PERALATAN Compressor Jack Hammer Wheel Loader Dump Truck Alat bantu

E05 E26 E15 E08

Jam Jam Jam Jam Ls

0.3333 0.3333 0.3333 0.1627 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.15.(6) : Pembongkaran Balok Baja (Steel Stringe : M'

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

2.0000 0.2000

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C. 1. 2. 3.

PERALATAN Crane Trailer 20 ton Alat bantu

E07 E29

Jam Jam Ls

0.2000 0.2000 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (16) : Pemancangan Tiang Pancang Beton . uku : M1 ( 40 x 40 ) cm

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

1.5060 0.3012 0.1506

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Pile Driver Alat Bantu

E30

jam Ls

0.1506 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (19) a :Tiang Bor Beton, diameter 800 mm : M1

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.0099 0.0050 0.0017

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Beton K-250 Baja Tulangan Casing

(EI-715) (EI-731)

M3 Kg M2

0.5027 75.3982 2.5133

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Bore Pile Concr. Pump Alat Bantu

E33 E28

jam jam Ls

0.0017 0.0757 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (19) b :Tiang Bor Beton, diameter ….. mm : M1

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.0099 0.0050 0.0017

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Beton K-250 Baja Tulangan Casing

(EI-715) (EI-731)

M3 Kg M2

0.7854 117.8097 3.1416

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Bore Pile Concr. Pump Alat Bantu

E33 E28

jam jam Ls

0.0017 0.1183 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 7.6 (5) :Dinding Turap Beton : M1

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.5069 0.5069 2.5346 JUMLAH HARGA TENAGA

B.

BAHAN

1. 2. 3.

Beton Pracetak K 350 Joint Sealent Plat Baja

(M72) (M94) M48

M3 Kg Kg

0.0700 0.3500 15.2681

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4.

Trailer Crane 1 Crane 2 Alat Bantu

E29 E07 E07

jam jam jam Ls

0.0487 0.0062 0.0049 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (20) : Tambahan Biaya untuk Nomor Mata Pemba : M1

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.0800 0.0267 0.0133

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Ponton + Tug Boat Crane Alat Bantu

E28

jam jam Ls

0.1594 0.0087 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.6 (21) : Tambahan Biaya untuk Nomor Mata Pemba : M1

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.9636 0.3212 0.1606

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Ponton + Tug Boat Crane Alat Bantu

E28

jam jam Ls

0.1606 0.0057 1.0000

JUMLAH HARGA PERALATAN D. E.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D

F. Note: 1 2

3 4

HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.15.(1) :Pembongkaran Pasangan Batu : M3

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

9.6386 1.2048

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1 2 3 4

Jack Hammer Wheel Loader Dump Truck Alat bantu

E26 E15 E08

Jam Jam Jam Ls

1.2048 0.0101 0.4817 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : Pembangun : SULUT/Kota Manado : 7.15.(3) :Pembongkaran Beton Pratekan : M3

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

2.4000 0.2000

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5

PERALATAN Compressor Jack Hammer Wheel Loader Dump Truck Alat bantu

E05 E26 E15 E08

Jam Jam Jam Jam Ls

0.2000 0.2000 0.2000 0.3750 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : Pembangun : SULUT/Kota Manado : 7.15 (4) : Pembongkaran Bangunan Gedung : M2

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

0.6000 0.0500

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5

PERALATAN Compressor Jack Hammer Wheel Loader Dump Truck Alat bantu

E05 E26 E15 E08

Jam Jam Jam Jam Ls

0.0500 0.0500 0.0500 0.2156 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.15 (7) : Pembongkaran Lantai Jembatan Kayu : M2

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

2.3013 0.2877

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1 2 3 4

Jack Hammer Wheel Loader Dump Truck Alat bantu

E26 E15 E08

Jam Jam Jam Ls

0.0000 0.0000 0.2877 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado : 7.15 (8) : Pembongkaran Jembatan Kayu : M2

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

2.1025 0.2628

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1 2 3 4

Chain Saw Crane Dump Truck Alat bantu

E07 E07 E08

Jam Jam Jam Ls

0.5000 0.2400 0.2628 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-761

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

: : :

1.00 76,197.36 0.01

JUMLAH HARGA (Rp.)

14,285.71 17,857.14 17,142.86

MLAH HARGA TENAGA

35,714.29 8,928.57 4,285.71 48,928.57

17,330.00

MLAH HARGA BAHAN

17,330.00

17,330.00

0.00

0.00

0.00 66,258.57 9,938.79 76,197.36

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-762

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

: : :

1.00 94,953.31 0.01

JUMLAH HARGA (Rp.)

14,285.71 17,857.14 17,142.86

47,619.05 11,904.76 5,714.29 65,238.10

17,330.00

17,330.00

17,330.00

0.00

0.00

0.00 82,568.10 12,385.21 94,953.31

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-763

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

: : :

1.00 93,387.94 0.01

JUMLAH HARGA (Rp.)

14,285.71 17,857.14 17,142.86

57,142.86 11,904.76 5,714.29 74,761.90

0.00 5,780.00

0.00 1,445.00

1,445.00

5000

5,000.00

5,000.00 81,206.90 12,181.04 93,387.94

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-764

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

MLAH HARGA TENAGA

19,060.00 11,000.00 225,000.00

MLAH HARGA BAHAN

482,029.71 625,016.51 625,016.51 115,559.99 0.00

MLAH HARGA PERALATAN

: : :

1.00 38,937.20 0.00

JUMLAH HARGA (Rp.)

53.48 22.28 5.35

81.11

20,013.00 2,309.99 11,250.00

33,572.99

40.98 55.93 55.93 51.50 0.00

204.33 33,858.43 5,078.76 38,937.20

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-768a

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

: : :

1.00 200,263.09 0.02

JUMLAH HARGA (Rp.)

100,000.00 41,666.67 10,000.00 151,666.67

19,060.00 11,000.00

20,013.00 2,322.41

22,335.41

482,029.71 625,016.51 115,559.99 0.00

41.20 67.48 31.06 0.00

139.74 174,141.82 26,121.27 200,263.09

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-768b

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

: : :

1.00 200,263.09 0.02

JUMLAH HARGA (Rp.)

100,000.00 41,666.67 10,000.00 151,666.67

19,060.00 11,000.00

20,013.00 2,322.41

22,335.41

482,029.71 625,016.51 115,559.99 0.00

41.20 67.48 31.06 0.00

139.74 174,141.82 26,121.27 200,263.09

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-768c

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

: : :

1.00 235,112.50 0.03

JUMLAH HARGA (Rp.)

120,000.00 50,000.00 12,000.00 182,000.00

19,060.00 11,000.00

20,013.00 2,309.99

22,322.99

482,029.71 625,016.51 115,559.99 0.00

40.98 55.93 25.75 0.00

122.66 204,445.65 30,666.85 235,112.50

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7613

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

: : :

1.00 233,468.66 0.03

JUMLAH HARGA (Rp.)

51,635.11 16,135.97 7,745.27 75,516.35

0.00

282,199.72 0.00

127,499.87 0.00

127,499.87 203,016.23 30,452.43 233,468.66

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7614a

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

: : :

1.00 77,822.89 0.01

JUMLAH HARGA (Rp.)

17,211.70 5,378.66 2,581.76 25,172.12

0.00

282,199.72 0.00

42,499.96 0.00

42,499.96 67,672.08 10,150.81 77,822.89

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7614b

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

: : :

1.00 77,822.89 0.01

JUMLAH HARGA (Rp.)

17,211.70 5,378.66 2,581.76 25,172.12

0.00

282,199.72 0.00

42,499.96 0.00

42,499.96 67,672.08 10,150.81 77,822.89

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-766

NTUK NG HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

: : :

1.00 94,953.31 0.01

JUMLAH HARGA (Rp.)

14,285.71 17,857.14 17,142.86

47,619.05 11,904.76 5,714.29 65,238.10

17,330.00

17,330.00

17,330.00

0.00

0.00

0.00 82,568.10 12,385.21 94,953.31

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-767

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

: : :

1.00 85,976.19 0.01

JUMLAH HARGA (Rp.)

14,285.71 17,857.14 17,142.86

57,142.86 11,904.76 5,714.29 74,761.90

0.00 0.00

0.00 0.00

0.00

0.00

0.00

0.00 74,761.90 11,214.29 85,976.19

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-791

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

MLAH HARGA TENAGA

260,700.00 1,269.98 213,000.00

MLAH HARGA BAHAN

175,230.07 243,811.40 0.00

MLAH HARGA PERALATAN

: : :

1.00 757,698.20 0.09

JUMLAH HARGA (Rp.)

15,697.07 4,905.34 2,354.56 22,956.97

279,600.75 223,515.60 108,384.23

611,500.58

24,067.74 342.71 0.00

24,410.45 658,868.00 98,830.20 757,698.20

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7101

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

MLAH HARGA TENAGA

63,498.75 213,000.00 0.00 262,400.00

MLAH HARGA BAHAN

175,230.07 243,811.40 0.00

MLAH HARGA PERALATAN

n Peralatan, volume dan/atau ukuran

: : :

1.00 921,702.10 0.11

JUMLAH HARGA (Rp.)

97,532.99 36,574.87 11,703.96 145,811.82

142,872.19 46,450.38 0.00 346,368.00

535,690.57

119,634.99 342.71 0.00

119,977.70 801,480.09 120,222.01 921,702.10

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa LI-7102

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

: : :

1.00 471,373.50 0.06

JUMLAH HARGA (Rp.)

14,285.71 17,857.14 17,142.86

MLAH HARGA TENAGA

75,000.00 31,250.00 15,000.00 121,250.00

262,400.00

MLAH HARGA BAHAN

288,640.00

288,640.00

0.00

MLAH HARGA PERALATAN

n Peralatan, volume dan/atau ukuran

0.00

0.00 409,890.00 61,483.50 471,373.50

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa LI-7103a

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

: : :

1.00 659,691.75 0.08

JUMLAH HARGA (Rp.)

14,285.71 17,857.14 17,142.86

MLAH HARGA TENAGA

75,000.00 46,875.00 15,000.00 136,875.00

10,000.00 260,700.00

MLAH HARGA BAHAN

150,000.00 286,770.00

436,770.00

0.00

MLAH HARGA PERALATAN

n Peralatan, volume dan/atau ukuran

0.00

0.00 573,645.00 86,046.75 659,691.75

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-713

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

: : :

1.00 44,620.00 0.01

JUMLAH HARGA (Rp.)

14,285.71 17,857.14 17,142.86

MLAH HARGA TENAGA

24,000.00 10,000.00 4,800.00

38,800.00

0.00 0.00

0.00 0.00 0.00

0.00

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan

0.00

0.00 38,800.00 5,820.00 44,620.00

edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7141

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

: : :

1.00 368,000.00 0.05

JUMLAH HARGA (Rp.)

14,285.71 17,857.14 17,142.86

MLAH HARGA TENAGA

200,000.00 0.00 120,000.00

320,000.00

0.00 0.00

0.00 0.00 0.00

0.00

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali

0.00

0.00 320,000.00 48,000.00 368,000.00

alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7152

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

1.00 689,234.81 0.09

HARGA SATUAN

JUMLAH HARGA

(Rp.)

(Rp.)

14,285.71 17,142.86

MLAH HARGA TENAGA

MLAH HARGA BAHAN

172,621.19 47,194.27 533,941.26 287,873.37 0.00

MLAH HARGA PERALATAN

178,571.43 17,857.14

196,428.57

0.00

179,813.74 49,160.70 5,409.21 168,522.40 0.00

402,906.05 599,334.62 89,900.19 689,234.81

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7155

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

1.00 443,548.18 0.06

HARGA SATUAN

JUMLAH HARGA

(Rp.)

(Rp.)

14,285.71 17,142.86

MLAH HARGA TENAGA

MLAH HARGA BAHAN

172,621.19 47,194.27 533,941.26 287,873.37 0.00

MLAH HARGA PERALATAN

76,190.48 11,428.57

87,619.05

0.00

57,540.40 15,731.42 177,980.42 46,822.78 0.00

298,075.02 385,694.07 57,854.11 443,548.18

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7156

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

1.00 291,420.63 0.04

HARGA SATUAN

JUMLAH HARGA

(Rp.)

(Rp.)

14,285.71 17,142.86

MLAH HARGA TENAGA

MLAH HARGA BAHAN

625,016.51 482,029.71 0.00

MLAH HARGA PERALATAN

28,571.43 3,428.57

32,000.00

0.00

125,003.30 96,405.94 0.00

221,409.24 253,409.24 38,011.39 291,420.63

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7616

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

: : :

JUMLAH HARGA (Rp.)

21,514.63 5,378.66 2,581.76 29,475.04

0.00

282,199.72 0.00

42,499.96 0.00

42,499.96 71,975.00 10,796.25 82,771.25

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7619a

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

: : :

1.00 2,349,951.45 0.29

JUMLAH HARGA (Rp.)

142.00 88.75 28.40 259.14

2,058,223.38 12,815.00 9,000.00

1,034,575.91 966,228.24 22,619.47

2,023,423.61

784,275.69 243,775.21 0.00

1,299.25 18,454.03 0.00

19,753.29 2,043,436.04 306,515.41 2,349,951.45

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7619b

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

: : :

1.00 3,662,662.18 0.46

JUMLAH HARGA (Rp.)

142.00 88.75 28.40 259.14

2,058,223.38 12,815.00 9,000.00

1,616,524.86 1,509,731.62 28,274.33

3,154,530.81

784,275.69 243,775.21 0.00

1,299.25 28,834.43 0.00

30,133.68 3,184,923.64 477,738.55 3,662,662.18

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-765

UNTUK ING HARGA SATUAN

………………

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

MLAH HARGA TENAGA

2,596,348.33 39,390.00 11,000.00

MLAH HARGA BAHAN

482,029.71 625,016.51 625,016.51 0.00

MLAH HARGA PERALATAN

: : :

1.00 521,665.05 0.07

JUMLAH HARGA (Rp.)

7,241.81 9,052.26 43,450.85 59,744.91

181,744.38 13,786.50 167,949.54

363,480.43

23,457.95 3,854.72 3,083.78 0.00

30,396.44 453,621.78 68,043.27 521,665.05

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7620

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

: : :

1.00 4,572.30 0.00

JUMLAH HARGA (Rp.)

1,142.86 476.19 228.57 1,847.62

0.00

0.00 243,775.21 0.00

0.00 2,128.30 0.00

2,128.30 3,975.92 596.39 4,572.30

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7624

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,857.14 17,142.86

: : :

1.00 27,202.04 0.00

JUMLAH HARGA (Rp.)

13,766.20 5,735.92 2,753.24 22,255.35

0.00

0.00 243,775.21 0.00

0.00 1,398.60 0.00

1,398.60 23,653.95 3,548.09

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

27,202.04

Analisa EI-7151

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

1.00 413,192.53 0.05

HARGA SATUAN

JUMLAH HARGA

(Rp.)

(Rp.)

14,285.71 17,142.86

MLAH HARGA TENAGA

MLAH HARGA BAHAN

47,194.27 533,941.26 287,873.37 0.00

MLAH HARGA PERALATAN

137,693.63 20,654.04

158,347.68

0.00

56,860.57 5,409.21 138,680.40 0.00

200,950.18 359,297.86 53,894.68 413,192.53

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7153

UNTUK ING HARGA SATUAN

………………

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

1.00 340,880.87 0.04

HARGA SATUAN

JUMLAH HARGA

(Rp.)

(Rp.)

14,285.71 17,142.86

MLAH HARGA TENAGA

MLAH HARGA BAHAN

172,621.19 47,194.27 533,941.26 287,873.37 0.00

MLAH HARGA PERALATAN

34,285.71 3,428.57

37,714.29

0.00

34,524.24 9,438.85 106,788.25 107,952.52 0.00

258,703.86 296,418.15 44,462.72 340,880.87

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7154

UNTUK ING HARGA SATUAN

………………

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

1.00 125,567.47 0.02

HARGA SATUAN

JUMLAH HARGA

(Rp.)

(Rp.)

14,285.71 17,142.86

MLAH HARGA TENAGA

MLAH HARGA BAHAN

172,621.19 47,194.27 533,941.26 287,873.37 0.00

MLAH HARGA PERALATAN

8,571.43 857.14

9,428.57

0.00

8,631.06 2,359.71 26,697.06 62,072.70 0.00

99,760.53 109,189.10 16,378.37 125,567.47

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7151

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

1.00 138,710.89 0.02

HARGA SATUAN

JUMLAH HARGA

(Rp.)

(Rp.)

14,285.71 17,142.86

MLAH HARGA TENAGA

MLAH HARGA BAHAN

47,194.27 533,941.26 287,873.37 0.00

MLAH HARGA PERALATAN

32,875.91 4,931.39

37,807.30

0.00

0.00 0.00 82,810.87 0.00

82,810.87 120,618.16 18,092.72 138,710.89

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

Analisa EI-7151

UNTUK ING HARGA SATUAN

………………

……………………………………. PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

1.00 299,233.13 0.04

HARGA SATUAN

JUMLAH HARGA

(Rp.)

(Rp.)

14,285.71 17,142.86

MLAH HARGA TENAGA

MLAH HARGA BAHAN

0.00 625,016.51 287,873.37 0.00

MLAH HARGA PERALATAN

30,035.98 4,505.40

34,541.38

0.00

0.00 150,003.96 75,657.39 0.00

225,661.35 260,202.72 39,030.41 299,233.13

n Peralatan, volume dan/atau ukuran

menyelesaikan satu satuan pekerjaan edia Jasa tidak dapat diubah kecuali alam Instruksi Kepada Peserta Lelang abis dipakai dan operator. berkaitan (tetapi tidak termasuk PPN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I. 1 2 3 4 5 6 7 8 9 10 II. 1 2 3 4

: 8.1 (1) : Pondasi Agregat Kls. A Untuk Pek. Minor : M3

U RAIAN

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : setempat2 di sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal lapis agregat padat Berat isi padat Jam kerja efektif per-hari Proporsi Campuran : - Agregat Pecah Kasar - Aggregat Halus Lapis pondasi A Berat Isi Agregat (lepas) Faktor kehilangan - Agregat Pecah Kasar - Aggregat Halus Lapis pondasi A URUTAN KERJA Wheel Loader mencampur & memuat Agregat ke dalam Dump Truck di Base Camp Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar secara manual Hamparan Agregat dibasahi dengan Water Tank Truck sebelum dipadatkan dengan Pedestrian Roller Sekelompok pekerja membuat galian lubang/patching, merapikan tepi hamparan dan level permukaan dengan menggunakan Alat Bantu

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN Agregat Pecah Kasar

2. 2.a.

Kap. Prod. / jam =

2.b.

KODE

L t Bip Tk APK

PU Bil Fh1 Fh2

= 1 M3 x (Bip/Bil) x Fh1

ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Memuat dan lain-lain

Koefisien Alat / M3

URAIAN ANALISA HARGA SAT

V x Fb x Fa x 60 Ts1 = 1 : Q1

DUMP TRUCK Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu Siklus : - Waktu memuat = V x 60/Q1 x Bil - Waktu tempuh isi = (L : v1) x 60 menit - Waktu tempuh kosong = (L : v2) x 60 menit - Lain-lain (termasuk dumping setempat-setempat)

KOEF.

SATUAN

25.0 0.15 1.81 7.00 69.85 30.15 1.51 1.05 1.05

KM M jam % % ton/m3

1.2586092715

M3

(E15) V Fb Fa

1.50 0.85 0.83

M3 -

Ts1

0.45

menit

Q1

141.10

M3

(E15)

0.0071

jam

(E08) V Fa v1 v2 T1 T2 T3 T4 Ts2

3.50 0.83 20.00 30.00 0.99 75.00 50.00 2.00 127.99

ton KM/jam KM/jam menit menit menit menit menit

Kap. Prod. / jam = Koefisien Alat / M3

V x Fa x 60 Ts2 x Bip = 1 : Q2

Q2 (E09)

0.75

M3

1.3291

jam

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1 (1) : Pondasi Agregat Kls. A Untuk Pek. Minor : M3

No.

2.c.

U RAIAN

PEDESTRIAN ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Faktor Efisiensi alat Kap. Prod. / jam = Koefisien Alat / M3

2.d.

(v x 1000) x b x t x Fa n = 1 : Q3

WATER TANK TRUCK Volume tanki air Kebutuhan air / M3 agregat padat Kapasitas pompa air Faktor Efisiensi alat Kap. Prod. / jam =

2.g.

pa x Fa x 60 1000 x Wc

Koefisien Alat / M3

= 1 : Q4

ALAT BANTU Diperlukan : - Kereta dorong - Sekop - Garpu

= 5 buah = 10 buah = 10 buah

TENAGA Produksi menentukan : WHEEL LOADER Produksi agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor 3.

Koefisien tenaga / M3 : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp. 946,492.17 / M3.

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

URAIAN ANALISA HARGA SAT

KODE

KOEF.

SATUAN

(E24) v b n Fa

1.50 0.61 6.00 0.83

KM/jam M lintasan -

Q3

18.99

M3

(E24)

0.0527

jam

(E23) V Wc pa Fa

4.00 M3 0.07 M3 100.00 liter/menit 0.83 -

Q4

71.14

M3

(E23)

0.0141

jam

Q1 Qt

141.10 987.70

M3/jam M3

P M

25.00 1.00

orang orang

(L01) (L03)

0.1772 0.0071

jam jam

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1.00 M3

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I. 1 2 3 4 5 6 7 8

9

II. 1 2 3 4

III. 1.

2. 2.a.

: 8.1 (2) : Pondasi Agregat Kls. B Untuk Pek. Minor : M3

U RAIAN

KODE

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : setempat2 di sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan L Tebal lapis agregat padat t Berat isi padat Bip Jam kerja efektif per-hari Tk Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 - Sirtu St Berat volume agregat (lepas) Bil - Agregat B Fh

KOEF.

SATUAN

25.0 0.15 1.81 7.00 18.00 22.00 60.00 1.51 1.05

KM M jam % % %

1.2586

M3

1.50 0.85 0.83

M3 -

0.45

menit

Ts1

0.45

menit

Q1

141.10

M3

(E15)

0.0071

jam

(E08) V Fa v1 v2 T1 T2

3.50 0.83 20.00 30.00 0.99 75.00

ton KM/jam KM/jam menit menit

URUTAN KERJA Wheel Loader mencampur & memuat Agregat ke dalam Dump Truck di Base Camp Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan pekerja Hamparan Agregat dibasahi dengan Water Tank Truck sebelum dipadatkan dengan Pedestrian Roller Sekelompok pekerja membuat galian lubang/patching, merapikan tepi hamparan dan level permukaan dengan menggunakan Alat Bantu PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agregat B = 1 M3 x (Bip/Bil) x Fh

(M27)

ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Memuat dan lain-lain

(E15) V Fb Fa Ts1 T1

Kap. Prod. / jam = Koefisien Alat / M3 2.b.

URAIAN ANALISA HARGA SAT

V x Fb x Fa x 60 Ts1 = 1 : Q1

DUMP TRUCK Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu Siklus : - Waktu memuat = V x 60/Q1 x Bil - Waktu tempuh isi = (L : v1) x 60 menit

- Waktu tempuh kosong = (L : v2) x 60 menit - Lain-lain (termasuk dumping setempat-setempat)

T3 T4 Ts2

50.00 2.00 127.99

Kap. Prod. / jam =

Q2

0.75

M3

1.3291

jam

Koefisien Alat / M3

V x Fa x 60 Bip x Ts2 = 1 : Q2

(E09)

menit menit menit

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1 (2) : Pondasi Agregat Kls. B Untuk Pek. Minor : M3

No.

2.c.

U RAIAN

PEDESTRIAN ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Faktor Efisiensi alat Kap. Prod. / jam = Koefisien Alat / M3

2.d.

(v x 1000) x b x t x Fa n = 1 : Q3

WATER TANK TRUCK Volume tanki air Kebutuhan air / M3 agregat padat Kapasitas pompa air Faktor Efisiensi alat Kap. Prod. / jam =

2.e.

3.

pa x Fa x 60 Wc x 1000

Koefisien Alat / M3

= 1 : Q4

ALAT BANTU Diperlukan : - Kereta dorong - Sekop - Garpu

= 5 buah = 10 buah = 10 buah

TENAGA Produksi menentukan : WHEEL LOADER Produksi agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / M3 : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp. 902,564.95 / M3.

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

URAIAN ANALISA HARGA SAT

KODE

KOEF.

SATUAN

(E24) v b n Fa

1.50 0.61 6.00 0.83

KM/jam M lintasan -

Q3

18.99

M3

(E24)

0.0527

jam

(E23) V Wc pa Fa

4.00 M3 0.07 M3 100.00 liter/menit 0.83 -

Q4

71.14

M3

(E23)

0.0141

jam

Q1 Qt

141.10 987.70

M3/jam M3

P M

15.00 1.00

orang orang

(L01) (L03)

0.1063 0.0071

jam jam

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1.00 M3

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN No.

I. 1 2 3 4 5 6 7 8 II. 1 2 3 4

III. 1.

2. 2.a.

: 8.1 (3) : Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup Aspal Utk. Pek. Minor URAIAN ANALISA HARGA SAT : M3 U RAIAN

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal lapis Agregat padat Berat isi padat Jam kerja efektif per-hari Berat volume agregat (lepas)

KOEF.

SATUAN

L t Bip Tk Bil

25.0 0.15 1.81 7.00 1.51

KM M Jam

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Material Agregat Kelas C hasil produksi di Base Camp Setiap 1 M3 Agregat padat diperlukan : 1 x Fk

(M28)

1.20

M3

ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu siklus - Muat

(E15) V Fb Fa Ts1 T1

1.50 0.85 0.83

M3 -

0.45

menit

Ts1

0.45

menit

Q1

117.71

M3

(E15)

0.0085

Jam

(E09) V Fa v1 v2 T1 T2 T3 T4 Ts2

10.00 ton 0.83 20.00 KM / Jam 30.00 KM / Jam 3.38 menit 75.00 menit 50.00 menit 10.00 menit 138.38 menit

URUTAN KERJA Wheel Loader memuat Agregat ke dalam Dump Tuck di Base Camp Dump Truck mengangkut Agregat ke lokasi pekerjaandan dihampar dengan pekerja Hamparaan Agregat dibasahi dengan Water Tank Truck sebelum dipadatkan dengan Pedestrian Roller. Sekelompok pekerja membuat galian lubang/patching, merapikan tepi hamparan dan level permukaan dengan menggunakan alat bantu

Kap. Prod. / jam = Koefisien Alat / M3 2.b.

KODE

V x Fb x Fa x 60 Bip/Bil x Ts1 = 1 : Q1

DUMP TRUCK Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu Siklus : - Waktu memuat = V x 60/Q1 x Bil - Waktu tempuh isi = (L : v1) x 60 menit - Waktu tempuh kosong = (L : v2) x 60 menit - Lain-lain (termasuk dumping setempat-setempat)

Kap. Prod./jam = Koefisien Alat / M3

V x Fa x 60 Bip/Bil x Ts2 = 1 : Q2

Q2 (E09)

3.00

M3

0.3331

Jam

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 8.1 (3) : Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup Aspal Utk. Pek. Minor URAIAN ANALISA HARGA SAT : M3

SATUAN PEMBAYARAN No.

2.c.

U RAIAN

PEDESTRIAN ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Faktor Efisiensi alat Kap. Prod. / jam = Koefisien Alat / M3

2.d.

(v x 1000) x b x t x Fa n = 1 : Q3

WATER TANK TRUCK Volume tanki air Kebutuhan air / M3 agregat padat Kapasitas pompa air Faktor Efisiensi alat Kap. Prod. / jam =

2.g.

3.

pa x Fa x 60 Wc x 1000

Koefisien Alat / M3

= 1 : Q4

ALAT BANTU diperlukan : - Kereta dorong - Sekop - Garpu

= 5 buah = 10 buah = 10 buah

TENAGA Produksi menentukan : WHEEL LOADER Produksi Agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / M3

: - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp. 647,936.25 / M3.

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

KODE

KOEF.

SATUAN

(E24) v b n Fa

1.50 0.61 6.00 0.83

KM/jam M lintasan -

Q3

18.99

M3

(E24)

0.0527

jam

(E23) V Wc pa Fa

0.84 M3 0.07 M3 100.00 liter/menit 0.83 -

Q4

71.14

M3

(E23)

0.0141

jam

Q1 Qt

117.71 M3 / Jam 823.99 M3

P M

15.00 1.00

orang orang

(L01) (L03)

0.1274 0.0085

Jam Jam

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1.00 M3

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1 (4) : Waterbound Macadam Utk. Pek. Minor : M3

No.

U RAIAN

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Jam kerja efektif per-hari Faktor kehilangan material Agregat Komposisi campuran (taksiran) : - Agregat Kasar - Agregat Halus 8 Berat jenis bahan : - Agregat 9 Berat isi padat 10 Berat volume agregat (lepas)

URAIAN ANALISA HARGA SAT

KODE

KOEF.

SATUAN

I.

1 2 3 4 5 6 7

II.

25.0 7 1.10

KM Jam -

Ak Ah

85.00 15

% %

D1 Bip Bil

1.80 1.81 1.51

ton / M3

URUTAN KERJA 1 Permukaan dasar dibersihkan dan diratakan 2 Agregat dimuat ke dalam Dump Truck dengan menggunakan Wheel Loader (di Base Camp) 3 Agregat Kasar ditebarkan (manual) sesuai tebal yang diperlukan dan dipadatkan dengan Three Wheel Roller (6-8 Ton) minimum 6 lintasan 4 Agregat Halus ditebarkan dan dipadatkan dengan disiram air agar mengisi rongga Agregat Kasar

III. 1. 1.a. 1.b. 2. 2.a.

L Tk Fh

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agregat Kasar = {(Ak x 1 M3) x Fh} Agregat Halus = {(Ah x 1 M3) x Fh}

(M03) (M04)

ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor efisiensi alat Waktu Siklus - Menunggu, dan lain lain

(E15) V Fb Fa Ts1 T1 Ts1

2.b.

Kap. Prod. / jam =

V x Fb x Fa x 60 Ts1 x (Bip/Bil)

Koefisien Alat/M3

= 1 : Q1

DUMP TRUCK (DT) Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong

Q1

(E15) (E09) V Fa v1 v2

0.9350 0.1650

M3 M3

1.5 0.85 0.83

M3 -

0.45

menit

0.45

menit

98.0943830571 M3

0.0102

Jam

10 ton 0.83 40.00 KM / Jam 50.00 KM / Jam

Waktu Siklus - Mengisi Bak = V : Q1 x 60 - Angkut = (L : v1) x 60 menit - Tunggu + dump + Putar - Kembali = (L : v2) x 60 menit

Ts2 T1 T2 T3 T4 Ts2

Kap.Prod. / jam =

V x Fa x 60 Ts2

Q2

Koefisien Alat / M3

= 1 : Q2

(E09)

6.1165581688 menit 37.5 menit 15.00 menit 30 menit 88.6165581688 menit 5.6197172435

M3

0.1779

Jam Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1 (4) : Waterbound Macadam Utk. Pek. Minor : M3

No.

2.c.

2.d.

3.

U RAIAN

KODE

THREE WHEEL ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Tebal Efektif Pemadatan Jumlah lintasan Lajur lintasan Lebar Overlap Faktor Efisiensi alat Apabila N <= 1 Kap. Prod. / jam = (v x 1000) x b x t x Fa n Apabila N > 1 Kap. Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 n

(E16) v b t n N bo Fa

Koefisien Alat / M3

= 1 : Q3

ALAT BANTU diperlukan : - Kereta dorong - Sekop - Sapu - Sikat

= = = =

3 5 5 3

: - Pekerja - Mandor

= (Tk x P) / Qt = (Tk x M) / Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

KOEF.

SATUAN

25.00 Km / Jam 1.20 M 0.10 M 8.00 lintasan 1.00 0.30 M 0.83 -

Q3

311.25

M3

Q3

0

M3

(E16)

0.0032

Jam

Q1 Qt

98.0943830571 M3/Jam 686.6606813996 M3

buah buah buah buah

TENAGA Produksi menentukan (Produksi Wheel Loader) Produksi Lapen / hari = Q1 x Tk Kebutuhan tenaga : - Pekerja - Mandor Koefisien Tenaga / M3

6.

URAIAN ANALISA HARGA SAT

483915.829 / M3.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

P M

16.00 1.00

orang orang

(L01) (L03)

0.1631 0.0102

Jam Jam

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1 M3

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I. 1 2 3 4 5 6 7 8

9

II. 1 2 3

4

III. 1.

: 8.1.(4) : Lapis Pondasi Agregat Kelas S untuk pekerjaan minor : M3 URAIAN ANALISA HARGA SAT

U RAIAN

KODE

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan L Tebal lapis agregat padat t Berat isi padat Bip Jam kerja efektif per-hari Tk Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 - Sirtu St Berat volume agregat (lepas) Bil Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1 Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2 - Sirtu Faktor kehilangan Fh3 URUTAN KERJA Wheel Loader mencampur dan memuat Agregat ke dalam Dump Truck di Base Camp Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan Motor Grader Hamparan Agregat dibasahi dengan Water Tank Truck sebelum dipadatkan dengan Tandem Roller Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparan dan level permukaan dengan menggunakan Alat Bantu PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agregat B = 1 M3 x (Bip/Bil) x Fh

(M27)

KOEF.

SATUAN

25.00 0.15 1.81 7.00 18.00 18.00 64.00 1.51 1.05 1.05 1.05

KM M jam % % % ton/m3

1.2586

M3

2. 2.a.

ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Memuat dan lain-lain

(E15) V Fb Fa Ts1 T1 Ts1

Kap. Prod. / jam = Koefisien Alat / M3 2.b.

V x Fb x Fa x 60 Ts1 x Bip/Bil = 1 : Q1

DUMP TRUCK Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu Siklus : - Waktu memuat = V x 60/Q1 x Bil - Waktu tempuh isi = (L : v1) x 60 menit - Waktu tempuh kosong = (L : v2) x 60 menit - dan lain-lain

Kap. Prod. / jam = Koefisien Alat / M3

V x Fa x 60 Ts2 x Bip = 1 : Q2

1.50 0.85 0.83

M3 -

0.45 0.45

menit menit

Q1

117.71

M3

(E15)

0.0085

jam

(E08) V Fa v1 v2

3.50 0.83 20.00 30.00

ton KM/jam KM/jam

T1 T2 T3 T4 Ts2

1.18 75.00 50.00 2.00 128.18

menit menit menit menit menit

Q2

0.75

M3

1.3311

jam

-

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1.(4) : Lapis Pondasi Agregat Kelas S untuk pekerjaan minor : M3

No.

2.c.

U RAIAN

MOTOR GRADER Panjang hamparan Lebar efektif kerja blade Faktor Efisiensi alat Kecepatan rata-rata alat Jumlah lintasan Lajur lintasan Lebar Overlap Waktu Siklus : - Perataan 1 lintasan = Lh : (v x 1000) x 60 - Lain-lain

Kap. Prod. / jam =

Lh x (N(b-bo)+bo) x t x Fa x 60 n x Ts3 = 1 : Q3

Koefisien Alat / M3 2.d.

TANDEM ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Jumlah lajur lintasan Lebar overlap Faktor Efisiensi alat Kap. Prod. / jam = Koefisien Alat / M3

2.e.

(v x 1000) x (N(b-bo)+bo) x t x Fa n = 1 : Q4

WATER TANK TRUCK Volume tanki air Kebutuhan air / M3 agregat padat Kapasitas pompa air Faktor Efisiensi alat Kap. Prod. / jam =

2.g.

3.

pa x Fa x 60 Wc x 1000

Koefisien Alat / M3

= 1 : Q6

ALAT BANTU Diperlukan : - Kereta dorong - Sekop - Garpu

= 2 buah. = 3 buah. = 2 buah.

TENAGA Produksi menentukan : WHEEL LOADER Produksi agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor

KODE

(E13) Lh b Fa v n N bo Ts3 T1 T2 Ts3

URAIAN ANALISA HARGA SAT

KOEF.

SATUAN

50.00 2.40 0.83 4.00 6.00 3.00 0.30

M M KM/jam lintasan

0.75 1.00 1.75

menit menit menit

M

Q3

234.77

M3

(E13)

0.0043

jam

(E17) v b n N bo Fa

3.00 1.20 6.00 3.00 0.30 0.83

KM/jam M lintasan m -

Q4

186.75

M3

(E17)

0.0054

jam

(E23) V Wc pa Fa

4.00 M3 0.07 M3 100.00 liter/menit 0.83 -

Q6

71.14

M3

(E23)

0.0141

jam

Q1 Qt

117.71 823.99

M3/jam M3

P M

7.00 1.00

orang orang

Koefisien tenaga / M3 : - Pekerja - Mandor 4.

= (Tk x P) : Qt = (Tk x M) : Qt

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

-

0.0595 0.0085

jam jam

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1.(4) : Lapis Pondasi Agregat Kelas S untuk pekerjaan minor : M3

No.

5.

U RAIAN

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

### / M3.

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1.00 M3

KODE

URAIAN ANALISA HARGA SAT

KOEF.

SATUAN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I. 1 2 3 4 5 6 7 8

9

10 11 II. 1 2

3 4

: 8.1 (5) : Camp. Aspal Panas Utk.Pek.Minor : M3

U RAIAN

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal Lapis Hotmix padat untuk patching Jam kerja efektif per-hari Faktor kehilangan material : - Agregat - Aspal Komposisi campuran ATB : - Coarse Agregat - Fine Agregat - Fraksi Filler - Asphalt minimum 6 % Berat jenis bahan : - ATB - Coarse Agregat & Fine Agregat - Fraksi Filler - Asphalt Jarak stock pile ke cold bin Faktor kembang

URAIAN ANALISA HARGA SAT

KODE

KOEF.

SATUAN

L t Tk Fh1 Fh2

25.0 0.04 7.00 1.10 1.05

KM M Jam -

CA FA FF As

55.00 37.50 1.00 6.50

% % % %

D1 D2 D3 D4 l Fk

2.30 1.80 2.00 1.03 100.00 1.20

ton / M3 ton / M3 ton / M3 ton / M3 m

URUTAN KERJA Wheel Loader memuat Agregat ke dalam Cold Bin AMP Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan Campuran panas ATB dihampar dengan manual dan dipadatkan dengan Pedestrian Roller Sekelompok pekerja membuat galian lubang/patching, merapikan tepi hamparaan dengan menggunakan Alat Bantu

III. 1. 1.a. 1.b. 1.c. 1.d.

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 Agregat Halus = (FA x (D1 x 1M3) x Fh1) : D2 Filler = (FF x (D1 x 1M3) x Fh1) x 1000 Aspal = (AS x (D1 x 1M3) x Fh2) x 1000

(M03) (M04) (M05) (M10)

0.7731 0.5271 25.300 157.0

M3 M3 Kg Kg

2. 2.a.

ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor efisiensi alat Kecepatan maju (ke bin) Kecepatan kembali (ke stock pile) Waktu Siklus

(E15) V Fb Fa Vf Vr Ts1

1.50 0.85 0.83 15.00 20.00

M3 km/jam km/jam

- Muat = - Lain lain

Kap. Prod. / jam =

Koefisien Alat/M3

l x 60 + l x 60 1000 x Vf 1000 x Vr

V x Fb x Fa x 60 Fh1 x Ts1xFk = 1 : Q1

T1 T2 Ts1

0.70 0.75 1.45

menit menit menit

Q1

33.17

M3

(E15)

0.0301

Jam

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1 (5) : Camp. Aspal Panas Utk.Pek.Minor : M3

No.

2.b.

U RAIAN

ASPHALT MIXING PLANT (AMP) Kapasitas produksi Faktor Efisiensi alat Kap.Prod. / jam =

2.d.

(E01) V Fa

V x Fa D1 x Fk = 1 : Q2

60.0 ton / Jam 0.83 -

(E01)

0.0554

Jam

GENERATORSET ( GENSET ) Kap.Prod. / Jam = SAMA DENGAN AMP Koefisien Alat/M3 = 1 : Q3

(E12) Q3 (E12)

18.04 0.0554

M3 Jam

DUMP TRUCK (DT) Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Kapasitas AMP / batch Waktu menyiapkan 1 batch AC Waktu Siklus - Mengisi Bak = (V : Q2b) x Tb - Angkut = (L : v1) x 60 menit - Tunggu + dump (setempat2) + Putar - Kembali = (L : v2) x 60 menit

(E09) V Fa v1 v2 Q2b Tb Ts2 T1 T2 T3 T4 Ts2

V x Fa x 60 D1 x Ts2 x Fk = 1 : Q4

Koefisien Alat/M3

Q4

(E09)

PEDESTRIAN ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Faktor Efisiensi alat

(E17) v b n Fa

Kap. Prod. / jam =

3.

SATUAN

M3

Koefisien Alat/M3

2.h.

KOEF.

18.04

Kap.Prod. / jam =

2.e.

KODE

Q2

Koefisien Alat/M3 2.c.

URAIAN ANALISA HARGA SAT

(v x 1000) x b x t x Fa n = 1 : Q5

Q5 (E17)

10.00 Ton 0.83 20.00 KM / Jam 30.00 KM / Jam 1.00 Ton 1.00 menit 10.00 75.00 25.00 50.00 160.00

menit menit menit menit menit

1.13

M3

0.8867

Jam

1.50 Km / Jam 0.61 M 6.00 lintasan 0.83 5.06

M3

0.1975

Jam

ALAT BANTU diperlukan : - Kereta dorong = 2 buah - Sekop, Garpu = 5 buah - Pacul, Linggis = 4 buah - Tongkat Kontrol ketebalan hanparan TENAGA Produksi menentukan : AMP Produksi ATB / hari = Tk x Q6 Kebutuhan tenaga :

Q6 Qt

18.04 M3 / Jam 126.30 M3

- Pekerja - Mandor Koefisien Tenaga / M3

4.

: - Pekerja - Mandor

= (Tk x P) / Qt = (Tk x M) / Qt

P M

20.00 2.00

orang orang

(L01) (L03)

1.1084 0.1108

Jam Jam

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1 (5) : Camp. Aspal Panas Utk.Pek.Minor : M3

No.

5.

U RAIAN

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

22,805.98 / M3.

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1.00 M3

URAIAN ANALISA HARGA SAT

KODE

KOEF.

SATUAN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1 (7) : Penetrasi Macadam Utk.Pek.Minor : M3

No.

I. 1 2 3 4 5 6 7 8

9

10 II.

U RAIAN

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal rata2 Lapen Jam kerja efektif per-hari Faktor kehilanganmaterial : - Agregat - Aspal Komposisi campuran Lapen (spesifikasi) : - Agregat Pokok - Agregat Pengunci - Aspal : - Paska Agregat Pokok

(Perata) URAIAN ANALISA HARGA SAT

KODE

KOEF.

SATUAN

L t Tk Fh1 Fh2

25.00 0.055 7.00 1.10 1.05

KM M Jam -

Ak Ap As1 As2

133.00 25.00 5.20 94.55

Kg/M2 Kg/M2 Kg/M2 Kg/M3

Berat jenis bahan : - Agregat - Aspal

D1 D2

1.80 1.01

Faktor kembang agregat

Fk

1.20

ton / M3 ton / M3

URUTAN KERJA Permukaan dasar dibersihkan dan disemprot aspal cair bilamana diperlukan 2 Agregat kasar dimuat ke dalam Dump Truck menggunakan Wheel Loader (di Base Camp) 3 Agregat Kasar ditebarkan (manual) sesuai tebal yang diperlukan dan dipadatkan dengan Three Wheel Roller (6-8 Ton) minimum 6 lintasan 4 Aspal disemprotkan di atas agregat kasar yang telah diratakan menggunakan Aspal Sprayer (merata) 5 Agregat Pengunci ditebarkan dan dipadatkan dengan cara yang sama dengan pemadatan agregat kasar 1

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. 1.a. 1.b. 1.c.

BAHAN Agregat Kasar Agregat Pengunci Aspal

2. 2.a.

ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor efisiensi alat Waktu Siklus - Memuat, menuang, kembali

= {(Ak/1000 : t M3) x Fh1} : D1 = {(Ap/1000 : t M3) x Fh1} : D1 = {(As : t M3) x Fh2}

(M03) (M04) (M10)

(E15) V Fb Fa Ts1 T1 Ts1

1.4778 0.2778 99.2727

M3 M3 Kg

1.50 0.85 0.83

M3 -

0.45

menit

0.45

menit

Kap. Prod. / jam =

Koefisien Alat/M3 2.b.

V x Fb x Fa x 60 Ts1 x Fk = 1 : Q1

DUMP TRUCK (DT) Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong

Q1

117.58

M3

(E15)

0.0085

Jam

(E09) V Fa v1 v2

10.00 ton 0.83 20.00 KM / Jam 30.00 KM / Jam

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1 (7) : Penetrasi Macadam Utk.Pek.Minor : M3

No.

2.c.

U RAIAN

SATUAN

2.36 75.00 2.00 50.00 129.36

Kap.Prod. / jam =

Q2

1.78

M3

0.5611

Jam

V x Fa x 60 Ts2 x D1 x Fk

Koefisien Alat / M3 = 1 = 1 : Q2

(E09)

THREE WHEEL ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Lajur lintasan Lebar Overlap Faktor Efisiensi alat Apabila N <= 1 Kap. Prod. / jam =

(E16) v b n N bo Fa

menit menit menit menit menit

2.00 Km / Jam 1.70 M 6.00 lintasan 2.00 0.30 M 0.83 -

(v x 1000) x b x t x Fa n

Q3

0

M3

(v x 1000) x (N(b-bo)+bo) x t x Fa x D1 n

Q3

84.909

M3

(E16)

0.0118

Jam

ASPHALT SPRAYER Kapasitas alat Faktor efisiensi alat Kapasitas pompa aspal

(E03) V Fa pas

850.00 0.83

liter liter/menit

Pemakaian aspal =

M10

99.2727

kg/m3

= 1 : Q3

Kap. Prod. / jam =

3.

KOEF.

Ts2 T1 T2 T3 T4 Ts2

Koefisien Alat / M3

2.e.

KODE

Waktu Siklus - Mengisi Bak = (V x 60)/(Q1 x D1 x Fk) - Angkut = (L : v1) x 60 menit - Tunggu + dump (setempat2) + Putar - Kembali = (L : v2) x 60 menit

Apabila N > 1 Kap. Prod. / jam =

2.d.

URAIAN ANALISA HARGA SAT

pas x Fa x 60 x D2 x 1000 1000 x M10

Koefisien Alat / M3

= 1 : Q4

ALAT BANTU diperlukan setiap : - Kereta dorong - Sekop - Sapu - Sikat - Karung - Cerek Aspal - Kaleng Aspal

= = = = = = =

75.00 3 buah 5 buah 5 buah 3 buah 5 buah 3 buah 3 buah

55

Q4

27.87

m3

(E03)

0.0359

Jam

Q1

117.58

M3/Jam

M3 pekerjaan

TENAGA Produksi menentukan (Produksi Wheel Loader)

Produksi Lapen / hari = Q1 x Tk Kebutuhan tenaga : - Pekerja - Mandor Koefisien Tenaga / M3

4.

: - Pekerja - Mandor

= (Tk x P) / Qt = (Tk x M) / Qt

Qt

823.08

M3

P M

20.00 2.00

orang orang

(L01) (L03)

0.1701 0.0170

Jam Jam

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

5.

: 8.1 (7) : Penetrasi Macadam Utk.Pek.Minor : M3

U RAIAN

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp. 2,326,880.86 / M3.

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1.00 M3

URAIAN ANALISA HARGA SAT

KODE

KOEF.

SATUAN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1 (8) : Camp. Aspal Dingin Utk.Pek.Minor : M3

No.

I. 1 2 3 4 5

6

7 II.

U RAIAN

ASUMSI Menggunakan buruh dan alat (semi mekanik) Lokasi pekerjaan : sepanjang jalan Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Batasan Spesifikasi : - Ukuran Agregat Nominal Maksimum - Kadar Aspal terhadap berat total campuran - Tebal nominal padat untuk patching Berat Jenis Bahan : - Campuran Aspal Dingin (diambil) - Aspal (diambil) - Agregat (diambil) Faktor kembang campuran

4 III.

URUTAN KERJA Agregat dan Aspal dicampur di dalam Pengaduk Beton Mekanis (Concrete Mixer) Campuran dibawa ke lokasi pekerjaan dengan menggunakan Dump Truck Pekerja membuat/merapikan lubang patching/galian, campuran dihampar manual dengan alat bantu Hamparan dipadatkan dengan Pedestrian Roller PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. 1.a. 1.b.

BAHAN Agregat Halus Aspal Emulsi

2. 2.a.

ALAT CONCRETE MIXER Kapasitas Alat Faktor Efisiensi Alat Waktu siklus : - Memuat - Mengaduk - Menuang - Tunggu, dll.

1 2 3

= {(100% - As) x 1M3 x D1} : D3 = {As x 1M3 x D1} x 1000

2.b.

PEDESTRIAN ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan

KODE

V x Fa x 60 1000 x Ts1x Fk = 1 : Q1

KOEF.

SATUAN

L Tk

25.0 7.00

KM jam

Sa As t

19.00 7.00 0.04

MM % M

D1 D2 D3 Fk

2.01 1.00 1.60 1.20

Ton/M3 Ton/M3 Ton/M3

(M04) (M31)

(E06) V Fa Ts1 T1 T2 T3 T4 Ts1

Kap. Prod. / jam =

Koefisien Alat / M3

URAIAN ANALISA HARGA SAT

1.1683 140.700

M3 Kg

500.00 0.83

liter -

0.50 1.00 0.30 0.20 2.00

menit menit menit menit menit

Q1

10.375

M3

(E06)

0.0964

jam

(E 24) v b n

1.50 0.61 6.00

KM/jam M lintasan

Faktor Efisiensi alat Kap. Prod. / jam = Koefisien Alat / M3

(v x 1000) x b x t x Fa n = 1 : Q2

Fa

0.83

-

Q2

5.06

M3

0.1975

jam

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1 (8) : Camp. Aspal Dingin Utk.Pek.Minor : M3

No.

2.c.

U RAIAN

DUMP TRUCK (DT) Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Kapasitas molen (Vmixer x Fa mixer)/(1000 x Fk) Waktu menyiapkan 1 molen campuran Waktu Siklus - Mengisi Bak = (V x Tb)/(D1 x Q1b x Fk) - Angkut = (L : v1) x 60 menit - Tunggu + dump (setempat2) + Putar - Kembali = (L : v2) x 60 menit

Kap.Prod. / jam =

V x Fa x 60 D1 x Ts2 x Fk

Koefisien Alat / M3

2.d.

3.

ALAT BANTU Diperlukan : - Sekop - Sapu - Alat Perata - Gerobak Dorong

= 1 : Q3

= = = =

3 4 3 2

KODE

(E09) V Fa v1 v2 Q1b Tb Ts2 T1 T2 T3 T4 Ts2 Q3

KOEF.

SATUAN

10.00 ton 0.83 20.00 KM / Jam 30.00 KM / Jam 0.35 M3 2.00 menit 23.98 75.00 10.00 50.00 158.98

menit menit menit menit menit

1.30

M3

(E09)

0.7700

Jam

Q1 Qt M P

10.375 72.63 2.00 12.00

M3/Jam M3 orang orang

(L03) (L01)

0.1928 1.1566

jam jam

buah buah buah buah

TENAGA Produksi menentukan (Produksi Concrete Mixer) Produksi Campuran dalam 1 hari = Tk x Q1 Kebutuhan tenaga : - Mandor - Pekerja

Koefisien Tenaga / M3 : - Mandor - Pekerja

= (Tk x M) : Qt = (Tk x P) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp. 3,010,859.09 / M3

6.

URAIAN ANALISA HARGA SAT

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1.00 M3

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I. 1 2 3 4 5 6

7

8

II. 1 2 3 4

: 8.1 (9) : Residu Bitumen Untuk Pek.Minor : LITER

U RAIAN

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Jarak rata-rata Base Camp ke lokasi pekerjaan Jam kerja efektif per-hari Faktor kehilangan bahan Komposisi campuran : - Aspal AC - 10 atau AC - 20 - Minyak Fluk / Pencair Berat jenis bahan : - Aspal AC - 10 atau AC - 20 - Minyak Fluk / Minyak Tanah (Kerosene) Bahan dasar (aspal & minyak pencair) semuanya diterima dilokasi pekerjaan

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN Untuk mendapatkan 1 liter Lapis resap Pengikat diperlukan : (1 liter x Fh) Aspal Kerosene

2.b.

KODE

KOEF.

SATUAN

L Tk Fh

3.0 7.00 1.10

KM Jam -

As K

87.00 13.00

% %

D1 D2

1.03 0.80

Kg / Ltr Kg / Ltr

Pc

1.10

liter

(M10) (M11)

0.99 0.14

Kg liter

URUTAN KERJA Aspal dan minyak tanah dicampur dan dipanaskan sehingga menjadi campuran aspal cair Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dengan Air Compresor Campuran aspal cair disemprotkan dengan Asphalt Sprayer ke atas permukaan yang akan dilapis Angkutan Aspal dan Minyak tanah menggunakan Dump Truck

III.

2. 2.a.

URAIAN ANALISA HARGA SAT

= As x Pc x D1 : 100 = K x Pc : 100

ALAT APHALT SPRAYER Kapasitas alat Faktor Efisiensi Alat Kapasitas pompa aspal

(E03) V Fa pas

Kap.Prod. / jam =

pas x fa x fh x 60

Koefisien Alat / Ltr

= 1 : Q1

AIR COMPRESOR

Q1 (E03)

850.00 liter 0.83 55.00 liter/menit 3,012.90

liter

0.0003

Jam

3,012.90

liter

0.0003

Jam

(E05)

Sama dengan pada asphalt sprayer Kap. Prod. / jam = Koefisien Alat / Ltr

Q2 = 1 : Q2

(E05)

2.c.

DUMP TRUCK (DT) Sebagai alat pengangkut bahan dilokasi pekerjaan Dump Truck melayani alat Asphalt Sprayer. Kap.Prod. / jam = sama dengan Asphalt Sprayer

(E09)

Koefisien Alat / Ltr

(E09)

= 1 : Q3

Q3

3,012.90

liter

0.0003

Jam

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1 (9) : Residu Bitumen Untuk Pek.Minor : LITER

No.

3.

U RAIAN

TENAGA Produksi menentukan : ASPHALT SPRAYER Produksi / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien Tenaga / Ltr

: - Pekerja - Mandor

= (Tk x P) / Qt = (Tk x M) / Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

15,325.36 / Liter

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1.00 Liter

URAIAN ANALISA HARGA SAT

KODE

KOEF.

SATUAN

Q1 Qt

3,012.90 21,090.30

liter liter

P M

10.00 1.00

orang orang

(L01) (L03)

0.0033 0.0003

Jam Jam

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.3.(1) : Stabilisasi Dengan Tanaman : M2

No.

I. 1 2 3 4 5 6 II. 1

U RAIAN

ASUMSI Menggunakan tenaga pekerja Lokasi pekerjaan : sepanjang jalan Bahan dasar (gebalan rumput) diterima seluruhnya di lokasi pekerjaan Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Faktor kehilangan bahan

KODE

L Tk Fh

KOEF.

SATUAN

0.00 7.00 1.10

KM jam -

(M32)

1.1000

M2

Qt M Tb P

100.00 1.00 2.00 4.00

M2 orang orang orang

(L03) (L02) (L01)

0.0700 0.1400 0.2800

jam jam jam

URUTAN KERJA Gebalan rumput dipasang di atas permukaan tanah yang telah siap ditanami

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. 1.a.

BAHAN Gebalan Rumput

= 1 M2 x Fh

2. 2.a.

ALAT ALAT BANTU - Gerobak Dorong - Tusuk Bambu - Pagar Tali

= 2 buah = 5 buah / M2 = sesuai kebutuhan

3.

URAIAN ANALISA HARGA SAT

TENAGA Produksi penanaman rumput dalam 1 hari Kebutuhan tenaga : - Mandor - Tukang - Pekerja Koefisien Tenaga / M2 : - Mandor = (Tk x M) : Qt - Tukang = (Tk x Tb) : Qt - Pekerja = (Tk x P) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

46,805.00 / M2

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan :

1.00 M2

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I. 1 2 3 4 5 6 II. 1 2 3 4 5 6

: 8.3.(1b) : Stabilisasi dengan Tanaman VS : M2

U RAIAN

ASUMSI Menggunakan tenaga pekerja Lokasi pekerjaan : di sepanjang jalan Bahan dasar diterima seluruhnya di lokasi pekerjaan Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Faktor kehilangan bahan

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN - Rumput - Tanah liat kepasiran 3 cm - Pupuk

2. 2.a

ALAT WATER TANK TRUCK Volume tanki air Kebutuhan air Kapasitas pompa air Faktor Efisiensi alat Kecepatan laju

3.

KODE

L Tk Fh

URUTAN KERJA Penggalian penggemburan tanah dan persiapan tempat Penanaman rumput, penimbunan dengan tanah liat kepasiran dan pemupukan Pemagaran (sesuai kebutuhan) Pemeliharaan (penyiraman) mempergunakan tangki air Kebutuhan rumput Penyiraman : Sehari sekali selama 2 minggu 2 hari sekali selama 2 minggu 2 kali seminggu selama 8 minggu

III. 1. 1.a. 1.b. 1.c.

2.b.

URAIAN ANALISA HARGA SAT

(M32)

(E23) V Wc pa Fa v

Koefisien Alat / M'

= (1 : v) x 90 x 1

ALAT BANTU - Pacul/sekop - Gerobak Dorong - Pagar Bambu/kayu

= 4 buah = 1 buah = sesuai kebutuhan

TENAGA Produksi penanaman rumput dalam 1 hari Kebutuhan tenaga : - Mandor - Tukang - Pekerja Koefisien Tenaga / M' : - Mandor = (Tk x M) : Qt - Tukang = (Tk x Tb) : Qt

KOEF.

SATUAN

3.00 7.00 1.10

km jam -

3 37

slip/m' hari

3.30 0.03 0.125

slip/m' m3 kg

4,000.00 liter 185.00 liter/meter 100.00 liter/menit 0.83 1,200.00 m/jam

(E23)

0.0308

jam

Qt M Tb P

200.00 1.00 0.00 6.00

M' orang orang orang

(L03) (L02)

0.0350 0.0000

jam jam

- Pekerja

= (Tk x P) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

14,970.15 / M'

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1.00 M'

(L01)

0.2100

jam

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.3.(2) : Semak/perdu : M2

No.

U RAIAN

I. 1 2 3

ASUMSI Menggunakan tenaga pekerja Lokasi pekerjaan : di sepanjang jalan Bahan dasar (semak/perdu) diterima seluruhnya di lokasi pekerjaan

5 6

Jam kerja efektif per-hari Faktor kehilangan bahan

1 2 3

URUTAN KERJA Penggalian lubang/ penggemburan tanah dan persiapan tempat Penanaman perdu, penimbunan dengan tanah humus Pemagaran (sesuai kebutuhan)

II.

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. 1.a. 1.b. 1.c.

BAHAN - Semak/perdu - Tanah humus setebal 20 cm - Pupuk

2. 2.a.

ALAT ALAT BANTU - Pacul/sekop - Gerobak Dorong - Pagar Bambu/kayu

3.

KODE

KOEF.

SATUAN

Tk Fh

7.00 1.10

jam -

(M32) mxx mxx

1.10 0.22 0.25

M2 m3 kg

= 4 buah = 1 buah = sesuai kebutuhan

TENAGA Produksi penanaman rumput dalam 1 hari Kebutuhan tenaga : - Mandor - Tukang - Pekerja Koefisien Tenaga / M2 : - Mandor = (Tk x M) : Qt - Tukang = (Tk x Tb) : Qt - Pekerja = (Tk x P) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

URAIAN ANALISA HARGA SAT

46,230.00 / M2

Qt M Tb P

100.00 1.00 0.00 6.00

M2 orang orang orang

(L03) (L02) (L01)

0.0700 0.0000 0.4200

jam jam jam

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1.00 M2

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.3.(3) : Pohon : Buah

No.

U RAIAN

I. 1 2 3 4

ASUMSI Menggunakan tenaga pekerja Lokasi pekerjaan : di sepanjang jalan Bahan dasar pohon dan bahan lainnya diterima di lokasi pekerjaan ukuran lubang 0,5 x 0,5 x 0,5 m

5 6

Jam kerja efektif per-hari Faktor kehilangan bahan

1 2 3

URUTAN KERJA Penggalian lubang Penanaman pohon dan penimbunan dengan tanah humus Pemagaran (sesuai kebutuhan)

II.

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. 1.a. 1.b. 1.c.

BAHAN - pohon - Tanah humus setebal 20 cm - Pupuk

2. 2.a.

ALAT ALAT BANTU - Pacul/sekop - Gerobak Dorong - Pagar Bambu/kayu

3.

KODE

KOEF.

SATUAN

Tk Fh

7.00 1.10

jam -

(M32) mxx mxx

1.00 0.22 0.50

bh m3 kg

= 4 buah = 1 buah = sesuai kebutuhan

TENAGA Produksi penanaman rumput dalam 1 hari Kebutuhan tenaga : - Mandor - Tukang - Pekerja Koefisien Tenaga / M2 : - Mandor = (Tk x M) : Qt - Tukang = (Tk x Tb) : Qt - Pekerja = (Tk x P) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

URAIAN ANALISA HARGA SAT

42,780.00 / bh

Qt M Tb P

100.00 1.00 0.00 6.00

M2 orang orang orang

(L03) (L02) (L01)

0.0700 0.0000 0.4200

jam jam jam

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1.00 bh

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I.

: 8.5.(1) : Pengembalian kondisi lantai jembatan beton : M2

U RAIAN

1 2 3 4 5 6

ASUMSI Pekerjaan dilakukan secara manual/mekanis Lokasi pekerjaan : di lokasi jembatan Kondisi Jalan : sedang / baik Jam kerja efektif per-hari Faktor kehilangan bahan Tebal plat jembatan

1 2 3 4

URUTAN KERJA Bidang yang akan dibongkar ditandai dengan cat/kapur Dilakukan pembongkaran menggunakan Jack hammer Pekerjaan pembesian (bila diperlukan) Pengecoran dan merapikan

II.

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN - Beton K300 - Baja tulangan (bila diperlukan)

2. 2.a.

SATUAN

7.00 1.10 0.20

Jam cm

0.22

m3 kg

COMPRESSOR, JACK HAMMER & LOADER

Koefisien Alat / m3

3.

Tk Fk

KOEF.

ALAT Produksi per jam

2.d.

KODE

URAIAN ANALISA HARGA SAT

Q1 = 1 : Q1

7.50 M3 / Jam 0.1333

Jam

Q1 Qt

7.50 52.50

M3/Jam M3

P M

12.00 1.00

orang orang

(L01) (L03)

1.6000 0.1333

Jam Jam

(E05/26)

ALAT BANTU Diperlukan alat-alat bantu kecil - Pahat / Tatah = 2 buah - Palu Besar = 1 buah - Alat2 pertukangan = 1 set TENAGA Produksi menentukan : JACK HAMMER Produksi Galian / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / M3 : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA

SATUAN. Didapat Harga Satuan Pekerjaan : Rp. 144,490.32 / M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1.00 M3

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.5.(2) : Pengembalian kondisi lantai jembatan kayu : M2

No.

I.

U RAIAN

1 2 3 4 5 6

ASUMSI Pekerjaan dilakukan secara manual/mekanis Lokasi pekerjaan : di lokasi jembatan Kondisi Jalan : sedang / baik Jam kerja efektif per-hari Faktor kehilangan bahan Tebal Lantai Jembatan Kayu

1 2 3 4

URUTAN KERJA Bidang yang akan dibongkar ditandai dengan cat/kapur Dilakukan pembongkaran menggunakan linggis atau ganco Lantai kayu yang rusak diganti dengan yang baru Ketinggian lantai kayu harus diperhatikan kerataannya

II.

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN - Kayu Klas I untuk 1 m2. - Paku dan material lainnya

2.

2.a.

3.

KODE

Tk Fk

URAIAN ANALISA HARGA SAT

KOEF.

SATUAN

7.00 1.10 0.10

Jam cm

0.10 0.20

m3 kg

Q1 Qt

1.00 7.00

M2/Jam M2/Hari

P M

4.00 1.00

orang orang

ALAT

ALAT BANTU Diperlukan alat-alat bantu kecil - Linggis / Ganco = 2 buah - Palu Besar = 1 buah - Alat2 pertukangan = 1 set TENAGA Produksi menentukan : Produksi Penggembalian kondisi / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / M3 : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK

(L01) (L03)

4.0000 1.0000

Jam Jam

PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp. 406,329.17 / M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1.00 M3

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I. 1 2 3 4 5 6 II. 1 2 3

: 8.5.(3) : Pengembalian kondisi pelapisan permukaan baja struktur : M2 URAIAN ANALISA HARGA SAT

U RAIAN

ASUMSI Pekerjaan dilakukan secara manual/mekanis Lokasi pekerjaan : di lokasi jembatan Kondisi Jalan : sedang / baik Jam kerja efektif per-hari Faktor kehilangan bahan Pelapisan permukaan dengan cat anti karat

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN - Cat anti karat per meter persegi - Ampelas dan material lainnya

2.a.

3.

Tk Fk

KOEF.

SATUAN

7.00 1.10 0.10

Jam cm

0.60 2.00

kg Lb

Q1 Qt

0.75 5.25

M2/Jam M2/Hari

P M

2.00 0.50

orang orang

URUTAN KERJA Bidang permukaan yang rusak dibersihkan Kemudian setelah bersih permukaan diampelas, sampai permukaan yang berkarat tidak ada Setelah bersih, dilakukan pelapisan dengan cat anti karat

III.

2.

KODE

ALAT

ALAT BANTU Diperlukan alat-alat bantu kecil - Pahat = 2 buah - Alat2 pertukangan = 1 set

TENAGA Produksi menentukan : Produksi Penggembalian kondisi / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / M3 : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN

(L01) (L03)

2.6667 0.6667

Jam Jam

Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

86,201.48 / M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1.00 M3

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I.

: 8.1 (6) : Lasbutag untuk pekerjaan minor : M3

U RAIAN

URAIAN ANALISA HARGA SAT

KODE

KOEF.

SATUAN

ASUMSI 1 2 3 4 5 6 7 8

9 10

II. 1 2

3 4 5 6

Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Jam kerja efektif per-hari Faktor kehilangan material Tebal Lapis Lasbutag padat untuk patching Lasbutag terdiri dari (spesifikasi) : - Agregat Kasar - Pasir - Asbuton - Peremaja, terdiri atas : - Bunker Oil (BO) - Aspal Semen - Minyak Tanah Penyiapan campuran dilaksanakan di Base Camp Berat Isi bahan : - Agregat Kasar - Pasir - Asbuton - Modifier - Bunker Oil (BO) - Aspal Semen - Minyak Tanah - Lasbutag URUTAN KERJA

L Tk Fp t

3.00 7.00 1.15 3.00

Km Jam Cm

CA Ps Asb Md Bo Asp Mt

30.00 49.50 16.00 4.50 47.00 38.00 15.00

% % % % % % %

D1 D2 D3 D4 D5 D6 D7 D8

1.80 1.80 1.05 0.99 0.97 1.03 0.80 2.20

T/m3 T/m3 T/m3 T/m3 T/m3 T/m3 T/m3 T/m3

Sekelompok pekerja membuat galian lubang/patching, dengan alat bantu Agregat kasar, pasir, bahan peremaja dan Asbuton dicampur merata menggunakan Concrete Mixer dan dilakukan pemeraman sesuai ketentuan Lasbutag dimuat ke Dump Truck dengan Loader dan diangkut ke lokasi pekerjaan Lasbutag dihampar dengan alat penghampar di atas permukaan yang telah disiapkan sebelumnya. Hamparan campuran dipadatkan dengan menggunakan Pemadat Roda Baja dilanjutkan Pemadat Roda Karet Selama pemadatan, sekelompok pekerja akan merapikan hamparan dengan menggunakan Alat Bantu

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN

1.a 1.b 1.c

Agregat Kasar Pasir Asbuton

= (CA x (D8 x 1M3) x 1.025) : D1 = (Ps x (D8 x 1M3) x 1.025) : D2 = (Asb x (D8 x 1M3) x 1.025) : D3

(M03) (M01) (M02)

0.3758 0.6201 0.3436

M3 M3 M3

1.d

Peremaja

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

2 2.a.

2.b.

2.c.

2.d.

: 8.1 (6) : Lasbutag untuk pekerjaan minor : M3

URAIAN

URAIAN ANALISA HARGA SAT

KODE

KOEF.

SATUAN

ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus :

Kap. Prod. / jam =

V x Fb x Fa x 60 Fp x Ts1

Koefisien Alat / M2

= 1 : Q1

DUMP TRUCK Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu Siklus - Waktu muat = ( V : D8 ) : ( Q1 x t/100 ) x 60 - Waktu tempuh isi = (L : v1) x 60 menit - Tuang ke penghampar dan lain-lain - Waktu tempuh kosong = (L : v2) x 60 menit

Kap. Prod./jam =

V x Fa x 60 D8 x Ts2

Koefisien Alat / M2

= 1 : Q2

PNEUMATIC TIRE ROLLER Kecepatan rata-rata Lebar efektif pemadatan Banyak Lintasan per lapis Lajur lintasan Lebar Overlap Faktor Efisiensi alat Kap.Prod. / jam =

(v x (N(b-bo)+bo) x Fa n

Koefisien Alat / M2

= 1 : Q3

TANDEM ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Faktor Efisiensi alat Kap. Prod./jam =

v x b x Fa

(E15) V Fb Fa Ts1

1.50 0.90 0.83 2.00

M3 menit

Ts1

2.00

menit

Q1

29.23

M3

(E15)

0.0342

Jam

(E08) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2 Q2

3.50 Ton 0.80 30.00 KM / Jam 40.00 KM / Jam 108.85 6.00 15.00 4.50 134.35

menit menit menit menit menit

0.57

M3

(E08)

1.7594

Jam

(E18) v b n N bo Fa

2.50 1.99 6.00 3.00 0.30 0.83

Km/Jam M lintasan

Q3

1.86

M3

0.53847

Jam

(E18) (E17) v b n Fa Q4

M

3.50 Km / Jam 1.68 M 4.00 lintasan 0.83 1.22

M3

Koefisien Alat / M2 2.e.

n = 1 : Q4

(E17)

0.8196

ASPHALT FINISHER Kecepatan menghampar Faktor efisiensi alat Lebar hamparan Kap.Prod. / jam = V x b x 60 x Fa

(E02) V Fa b Q5

20.00 0.85 3.15 3,213.00

Koefisien Alat / M2

(E02)

0.0003

= 1 : Q5

Jam

m/menit meter M2 Jam

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1 (6) : Lasbutag untuk pekerjaan minor : M3

No.

2.f.

U RAIAN

CONCRETE MIXER Kapasitas Alat Faktor Efisiensi Alat Waktu siklus : - Memuat - Mengaduk - Menuang - Menunggu, dll.

2.d.

V x Fa x 60 1000 x Ts1 x t

3.

ALAT BANTU diperlukan : - Kereta dorong - Sekop - Sapu lidi

KODE

(E06) V Fa Ts3 T1 T2 T3 T4 Ts1

Kap. Prod. / jam =

Koefisien Alat / M2

URAIAN ANALISA HARGA SAT

= 1 : Q6

KOEF.

SATUAN

500.00 0.85

liter -

0.50 1.00 0.30 0.20 2.00

menit menit menit menit menit

4.25

M3

0.2353

jam

Q5 Qt

3,213.00 22,491.00

M2 M2

P M

20.00 1.00

orang orang

(L01) (L02)

0.0062 0.0003

Jam Jam

Q6

(E06)

= 2 buah = 3 buah = 5 buah

TENAGA Produksi menentukan : ASPHALT FINISHER Produksi / hari = Tk x Q5 Kebutuhan tenaga : - Pekerja - Mandor

Koefisien Tenaga / M2

: - Pekerja - Mandor

= (Tk x P) / Qt = (Tk x M) / Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

### / M2.

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan :

1.00 M2

Analisa EI-811 URAIAN ANALISA HARGA SATUAN

KETERANGAN

memenuhi Spec.

panduan

Berlanjut ke halaman berikut

Analisa EI-811 URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Lump Sum

Analisa EI-812 URAIAN ANALISA HARGA SATUAN

KETERANGAN

Gradasi harus memenuhi Spesifikasi

Berlanjut ke halaman berikut

Analisa EI-812 URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Lump Sum

Analisa EI-813 URAIAN ANALISA HARGA SATUAN

KETERANGAN

Agregat lepas

Berlanjut ke halaman berikut

Analisa EI-813 URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Lump Sum

Analisa EI-814 URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK KETERANGAN

8.725 7 1.1 0 85 15 0 1.8 1.81 1.51

0.935 0.165

1.5 0.85 0.83 0 0.45 0 0.45 0 98.0943830571

0.0101942636

10 0.83 40 50

6.1165581688 13.0875 15 10.47 44.6740581688 11.1474090426

0.0897069441 Berlanjut ke halaman berikut

Analisa EI-814 URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Lump Sum

Analisa EI-512 URAIAN ANALISA HARGA SATUAN

KETERANGAN

Gradasi harus memenuhi Spesifikasi

lepas kondisi sedang panduan

Berlanjut ke hal. berikut

Analisa EI-512 URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

1 x pp

Lump Sum

Berlanjut ke hal. berikut

Analisa EI-512 URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Analisa EI-815 URAIAN ANALISA HARGA SATUAN

KETERANGAN

Rata-rata

Gradasi harus memenuhi Spesifikasi

Berlanjut ke halaman berikut

Analisa EI-815 URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Lump Sum

Berlanjut ke halaman berikut

Analisa EI-815 URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Analisa EI-817 URAIAN ANALISA HARGA SATUAN

KETERANGAN

(As1 : t)

Berlanjut ke halaman berikut

Analisa EI-817 URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Lump Sum

Berlanjut ke halaman berikut

Analisa EI-817 URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Analisa EI-818 URAIAN ANALISA HARGA SATUAN

KETERANGAN

Rata-rata

diambil

Berlanjut ke halaman berikut

Analisa EI-818 URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Melayani 1 buah molen

Analisa EI-819 URAIAN ANALISA HARGA SATUAN

KETERANGAN

100 bagian 15 bagian

campuran

Berlanjut ke halaman berikut

Analisa EI-819 URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Analisa LI-831 URAIAN ANALISA HARGA SATUAN

KETERANGAN

Analisa LI-831b URAIAN ANALISA HARGA SATUAN

KETERANGAN

Analisa LI-832 URAIAN ANALISA HARGA SATUAN

KETERANGAN

Analisa LI-833 URAIAN ANALISA HARGA SATUAN

KETERANGAN

Analisa EI-851 URAIAN ANALISA HARGA SATUAN

KETERANGAN

(E05/26/10/15)

Lump Sump

Analisa EI-851 URAIAN ANALISA HARGA SATUAN

KETERANGAN

Lump Sump

Analisa EI-851 URAIAN ANALISA HARGA SATUAN

KETERANGAN

Lump Sump

Analisa EI-811 URAIAN ANALISA HARGA SATUAN

KETERANGAN

Total Campuran Total Campuran Total Campuran Total Campuran Total Modifier Total Modifier Total Modifier

Berlanjut ke hal. berikut.

Analisa EI-811 URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

lihat tabel V - loading

Panduan

Berlanjut ke hal. berikut.

Analisa EI-811 URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Lump Sum

Analisa EI-811 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA MATA PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.1 (1) TOTAL HARGA (Rp.) : Pondasi Agregat Kls. A Untuk % THD. BIAYA PROYEK : M3 Pek. Minor

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN (Rp.)

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

jam jam

BAHAN

1.

Agregat Pecah Kasar

M3

0.1772 0.0071

1.258609272

14,285.71 17,142.86

337,983.91

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4. 5.

Wheel Loader Dump Truck Pedestrian Roller Water Tanker Alat Bantu

E15 E08 E24 E23

jam jam jam jam Ls

0.0071 1.3291 0.0527 0.0141 1.0000

533941.263379914 287873.374193005 98426.3635304272 243811.395253266 0

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3

1 946492.17046607 0.1180685092

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA B.

: : :

2531.1329351018 121.4943808849

2652.6273159866

425389.68682941

425389.68682941

3784.1336880221 382599.06776807 5184.0865642466 3427.0678047648 0

394994.3558251

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 823036.66997049 OVERHEAD & PROFIT 15.0 % x D 123455.50049557 HARGA SATUAN PEKERJAAN ( D + E ) 946492.17046607 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-812 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA MATA PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.1 (2) TOTAL HARGA (Rp.) : Pondasi Agregat Kls. B Untuk % THD. BIAYA PROYEK : M3 Pek. Minor

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN (Rp.)

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

jam jam

JUMLAH HARGA (Rp.)

0.1063 0.0071

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Agregat Kasar

(M03)

M3

1.2586

308,439.30

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4. 5.

Wheel Loader Dump Truck Pedestrian Roller Water Tanker Alat Bantu

E15 E08 E24 E23

jam jam jam jam Ls

0.0071 1.3291 0.0527 0.0141 1.0000

533941.263379914 287873.374193005 98426.3635304272 243811.395253266 0

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

1 902564.9540346 0.1125888855

: : :

1518.6797610611 121.4943808849

1640.1741419459

388204.56049782

388204.56049782

3784.1336880221 382599.06776807 5184.0865642466 3427.0678047648 0

394994.3558251

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 784839.09046487 OVERHEAD & PROFIT 15.0 % x D 117725.86356973 HARGA SATUAN PEKERJAAN ( D + E ) 902564.9540346 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-813 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.1 (3) : Agregat Utk. Lapis Pond. Jalan - Tanpa TOTAL HARGA (Rp.)

SATUAN PEMBAYARAN

: M3

% THD. BIAYA PROYEK

NO.

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN (Rp.)

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

Jam Jam

BAHAN

1.

Agregat Kelas C (M28)

M3

0.1274 0.0085

1.2000

14,285.71 17,142.86

319,316.63

JUMLAH HARGA BAHAN C.

PERALATAN

1 2 3 4 5

Wheel Loader Dump Truck Pedestrian Roller Water Tanker Alat Bantu

E15 E09 E24 E23

Jam Jam Jam Jam Ls

0.0085 0.3331 0.0527 0.0141 1.0000

533941.263379914 495785.147464532 98426.3635304272 243811.395253266 0

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

1 647936.24817563 0.0808256732

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA B.

: : :

1820.404216901 145.6323373521

1966.0365542531

383179.95793225

383179.95793225

4535.9483280265 165129.72731701 5184.0865642466 3427.0678047648 0

178276.83001405

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 563422.82450055 OVERHEAD & PROFIT 15.0 % x D 84513.423675083 HARGA SATUAN PEKERJAAN ( D + E ) 647936.24817563 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-814

ORMULIR STANDAR UNTUK NALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

A. 1. 2.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.1 (4) TOTAL HARGA (Rp.) : Waterbound Macadam Utk. Pek. Minor % THD. BIAYA PROYEK : M3

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN (Rp.)

KOMPONEN

JUMLAH HARGA (Rp.)

(L01) (L03)

Jam Jam

0.163108218 0.010194264

14,285.71 17,142.86

JUMLAH HARGA TENAGA

1. 2.

(M03) (M03) (M04) (M04)

M3 M3

0.935 0.165

308,439.30 215,365.96

JUMLAH HARGA BAHAN

1. 2. 3. 4.

E15 E09 E16

Jam Jam Jam Ls

0.010194264 0.177944896 0.003212851 1

533,941.26 495,785.15 217,811.32 0

JUMLAH HARGA PERALATAN

F. Note: 1

2,504.88

288,390.74 35,535.38

323,926.13

PERALATAN Wheel Loader Dump Truck 3-Wheel Roller Alat BAntu

D. E.

2,330.12 174.76

BAHAN Agregat Kasar Agregat Halus

C.

1 1004839.1646884 0.1253469029

TENAGA Pekerja Biasa Mandor

B.

: : :

5,443.14 88,222.44 699.80 -

94,365.37

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 420,796.37 OVERHEAD & PROFIT 15 % x D 63,119.46 HARGA SATUAN PEKERJAAN ( D + E ) 483,915.83 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan.

2

3 4

Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-512 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.1.(4) : Lapis Pondasi Agregat Kelas S untuk peTOTAL HARGA % THD. BIAYA PROYEK : M3

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN (Rp.)

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

jam jam

0.0595 0.0085

BAHAN

1.

Aggregat S

M27

M3

1.2586

1 626681.23512955 0.0781742538

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

: : :

378488.761837643

849.5219678871 145.6323373521

995.1543052392

476369.46481619

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6.

PERALATAN Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker Alat Bantu

(E15) (E08) (E13) (E17) (E23)

jam jam jam jam jam Ls

0.0085 1.3311 0.0043 0.0054 0.0141 1.0000

533,941.26 287,873.37 659,813.19 457,658.59 243811.395253266 0

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

476369.46481619

4535.9483280265 383184.45376188 2810.4492512248 2450.6484182131 3427.0678047648 0

396408.56756411

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 873773.18668553 OVERHEAD & PROFIT 15.0 % x D 131065.97800283 HARGA SATUAN PEKERJAAN ( D + E ) 1004839.1646884 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-815 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.1 (5) TOTAL HARGA (Rp.) : Camp. Aspal Panas Utk.Pek.Minor % THD. BIAYA PROYEK : M3

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN (Rp.)

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

Jam Jam

BAHAN

1. 2. 3 4

Agregat Kasar Agregat Halus Filler Aspal

(M03) (M04) (M05) (M10)

M3 M3 Kg Kg

1.1084 0.1108

14,285.71 17,142.86

0.7731 0.5271 25.3000 156.9750

308,439.30 420,978.60 1,500.00 12,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6.

PERALATAN Wheel Loader AMP Genset Dump Truck Pedestrian Roller Alat Bantu

E15 E01 E12 E09 E24

Jam Jam Jam Jam Jam Ls

0.0301 0.0554 0.0554 0.8867 0.1975 1.0000

533941.263379914 5782563.38186737 411499.199621745 495785.147464532 98426.3635304272 0

JUMLAH HARGA PERALATAN D. E.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D

1 3682389.8858842 0.4593532813

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA B.

: : :

15834.767641997 1900.1721170396

17734.939759036

238440.71307504 221890.80192051 37950 1883700

2381981.5149956

16095.181953054 320479.41634446 22805.979738073 439635.98618542 19440.324615925 0

802361.70688387 3202078.1616385 480311.72424577

F. Note: 1 2

3 4

HARGA SATUAN PEKERJAAN ( D + E ) 3682389.8858842 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-817 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.1 (7) TOTAL HARGA : Penetrasi Macadam Utk.Pek.Minor % THD. BIAYA PROYEK : M3 (Perata)

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN (Rp.)

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

Jam Jam

BAHAN

1. 2. 3

Agregat Kasar Agregat Halus Aspal

(M03) (M04) (M10)

M3 M3 Kg

0.1701 0.0170

14,285.71 17,142.86

1.7556 0.0000 99.2727

308,439.30 420,978.60 12,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4. 5.

Wheel Loader Dump Truck 3-Wheel Roller Asp. Sprayer Alat bantu

E15 E09 E16 E03

Jam Jam Jam Jam Ls

0.0085 0.5611 0.0118 0.0359 1.0000

533941.263379914 495785.147464532 217811.317510887 72784.8856588286 0

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

1 2326880.8563958 0.2902626799

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA B.

: : :

2429.8876176977 291.5865141237

2721.4741318214

541482.32361993 0 1191272.7272727

1732755.0508927

4540.9604256265 278180.03263711 2565.2323959873 2611.9072522622 0

287898.13271099 2023374.6577355 303506.19866032 2326880.8563958

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-818

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.1 (8) TOTAL HARGA : Camp. Aspal Dingin Utk.Pek.Minor % THD. BIAYA PROYEK : M3

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN (Rp.)

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

jam jam

BAHAN

1. 2.

Agregat Halus Aspal Emulsi

(M04) (M31)

M3 Kg

1.1566 0.1928

1.1683 140.7000

14,285.71 17,142.86

420,978.60 12,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4.

Conc. Mixer Pedestrian Roller Dump Truck Alat Bantu

E06 E24 E09

jam jam jam Ls

0.0964 0.1975 0.7700 1.0000

175230.071428571 98426.3635304272 495785.147464532 0

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3

1 3010859.0875525 0.3755843472

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA B.

: : :

16523.235800344 3304.6471600689

19827.882960413

491834.55655733 1688400

2180234.5565573

16889.645438899 19440.324615925 381745.92742958 0

418075.8974844

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2618138.3370021 OVERHEAD & PROFIT 15.0 % x D 392720.75055032 HARGA SATUAN PEKERJAAN ( D + E ) 3010859.0875525 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-819

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.1 (9) TOTAL HARGA : Residu Bitumen Untuk Pek.Minor % THD. BIAYA PROYEK : LITER

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN (Rp.)

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

Jam Jam

0.0033 0.0003

BAHAN

1. 2.

Aspal Kerosene

(M10) (M11)

Kg Liter

14,285.71 17,142.86

0.9857 0.1430

12,000.00 8,383.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Asphalt Sprayer Compresor Dump Truck

E03 E05 E09

Jam Jam Jam

0.0003 0.0003 0.0003

72784.8856588286 172621.189585054 495785.147464532

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3

1 15325.359881984 0.0019117352

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA B.

: : :

47.4151624206 5.6898194905

53.1049819111

11828.52 1198.769

13027.289

24.157750227 57.2940321899 164.5541330494

246.0059154663

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 13326.399897378 OVERHEAD & PROFIT 15.0 % x D 1998.9599846066 HARGA SATUAN PEKERJAAN ( D + E ) 15325.359881984 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI-831 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.3.(1) TOTAL HARGA (Rp.) : Stabilisasi Dengan Tanaman % THD. BIAYA PROYEK : M2

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN (Rp.)

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.2800 0.1400 0.0700

BAHAN

1.

Gebalan Rumput

M32

M2

1.1000

14,285.71 17,857.14 17,142.86

PERALATAN

1.

Alat Bantu

Ls

1.0000

4000 2500 1200 7700

30,000.00

JUMLAH HARGA BAHAN C.

1 46805 0.0058386078

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA B.

: : :

33000

33000

0

0

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3

0

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 40700 OVERHEAD & PROFIT 15.0 % x D 6105 HARGA SATUAN PEKERJAAN ( D + E ) 46805 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI-831b FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.3.(1b) TOTAL HARGA (Rp.) : Stabilisasi dengan Tanaman VS % THD. BIAYA PROYEK : M2

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN (Rp.)

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.2100 0.0000 0.0350

BAHAN

1. 2 3

Rumput Tanah Liat Pupuk

M32

M2 m3 kg

3.3000 0.0330 0.1250

JUMLAH HARGA BAHAN

1 14970.145723355 0.0018674246

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA

B.

: : :

3000 0 600

3600

300 20000 2000

990 660 250

1900

C.

PERALATAN

1. 2

Water Tank Truk Alat Bantu

jam Ls

0.0308 1.0000

243811.395253266 0

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

7517.518020309 0

7517.518020309

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 13017.518020309 OVERHEAD & PROFIT 15.0 % x D 1952.6277030464 HARGA SATUAN PEKERJAAN ( D + E ) 14970.145723355 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI-832 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.3.(2) TOTAL HARGA (Rp.) : Semak/perdu % THD. BIAYA PROYEK : M2

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN (Rp.)

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.4200 0.0000 0.0700

BAHAN

1.

Gebalan Rumput

M32

M2

1.1000

JUMLAH HARGA BAHAN C.

PERALATAN

1 46230 0.0057668804

JUMLAH HARGA (Rp.)

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA

B.

: : :

30,000.00

6000 0 1200

7200

33000

33000

1.

Alat Bantu

Ls

1.0000

JUMLAH HARGA PERALATAN D. E.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D

0

0

0 40200 6030

F. Note: 1 2

3 4

HARGA SATUAN PEKERJAAN ( D + E ) 46230 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI-833 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.3.(3) TOTAL HARGA (Rp.) : Pohon % THD. BIAYA PROYEK : Buah

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN (Rp.)

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

(L01) (L02) (L03)

jam jam jam

0.4200 0.0000 0.0700

BAHAN

1.

- pohon - Tanah humus setebal 20 cm - Pupuk

bh m3 kg

1.0000 0.2200 0.5000

JUMLAH HARGA BAHAN C.

PERALATAN

1 42780 0.0053365162

JUMLAH HARGA (Rp.)

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA

B.

: : :

30,000.00 5000 5000

6000 0 1200

7200

30000

30000

1.

Alat Bantu

Ls

1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

0

0

0 37200 5580 42780

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-851 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.5.(1) : Pengembalian kondisi lantai jembatan bTOTAL HARGA (Rp.) % THD. BIAYA PROYEK : M2

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN

KOMPONEN

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

1.6000 0.1333

(Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

22857.142857143 2285.7142857143

25142.857142857

BAHAN

JUMLAH HARGA BAHAN C. 1. 2. 3. 4.

1 144490.31727551 0.0180241917

JUMLAH HARGA

(Rp.)

A.

: : :

PERALATAN Compressor Jack Hammer Wheel Loader Alat bantu

E05 E26 E15

Jam Jam Jam Ls

0.1333 0.1333 0.1333 1.0000

172621.189585054 47194.2746082315 533941.263379914 0

0

23016.158611341 6292.5699477642 71192.168450655 0

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

100500.89700976

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 125643.75415262 OVERHEAD & PROFIT 15.0 % x D 18846.563122893 HARGA SATUAN PEKERJAAN ( D + E ) 144490.31727551 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-851 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.5.(2) : Pengembalian kondisi lantai jembatan TOTAL HARGA (Rp.) % THD. BIAYA PROYEK : M2

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN

KOMPONEN

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

4.0000 1.0000

(Rp.)

14285.7142857143 17142.8571428571

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Kayu Klas I Paku

M3 Kg

0.1000 0.2000

PERALATAN

1

Alat bantu

Ls

1.0000

57142.857142857 17142.857142857

74285.714285714

2750000 20220

JUMLAH HARGA BAHAN C.

1 406329.17142857 0.0506868213

JUMLAH HARGA

(Rp.)

A.

: : :

275000 4044

279044

0

0

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

0

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 353329.71428572 OVERHEAD & PROFIT 15.0 % x D 52999.457142857 HARGA SATUAN PEKERJAAN ( D + E ) 406329.17142857 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-851 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.5.(3) : Pengembalian kondisi pelapisan permukTOTAL HARGA (Rp.) % THD. BIAYA PROYEK : M2

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN

KOMPONEN

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

2.6667 0.6667

(Rp.)

14285.7142857143 17142.8571428571

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Cat anti karat Ampelas

M2 Lb

0.6000 2.0000

PERALATAN

1

Alat bantu

Ls

1.0000

38095.238095238 11428.571428572

49523.80952381

42390 0

JUMLAH HARGA BAHAN C.

1 86201.480952381 0.0107530529

JUMLAH HARGA

(Rp.)

A.

: : :

25434 0

25434

0

0

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

0

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 74957.80952381 OVERHEAD & PROFIT 15.0 % x D 11243.671428572 HARGA SATUAN PEKERJAAN ( D + E ) 86201.480952381 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-641 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado …………………………………………………………………. : SULUT/Kota Manado PERKIRAAN VOL. PEK. : 8.1 (6) TOTAL HARGA (Rp.) : Lasbutag untuk pekerjaan minor % THD. BIAYA PROYEK : M3

PERKIRAAN HARGA SATUAN KUANTITAS SATUAN (Rp.)

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L02)

Jam Jam

BAHAN

1. 2. 3

Agr. Kasar Pasir Asbuton

(M03) (M01) (M02)

M3 M3 M3

0.0062 0.0003

0.3758 0.6201 0.3436

14,285.71 17,142.86

213,000.00 15,782,278.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Wheel Loader Dump Truck

(E15) (E08)

Jam Jam

0.0342 1.7594

1 7733898.3728587 0.9647516164

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA B.

: : :

533,941.26 287,873.37

88.9244586724 5.3354675203

94.2599261927

0 132086.625 5423091.3356191

5555177.9606191

18266.620642181 506479.65815943

3. 4. 5. 6. 7.

P. Tyre Roller Tnd. Roller Asp. Finisher Conc. Mixer Alat Bantu

(E18) (E17) (E02) (E06)

Jam Jam Jam Jam Ls

0.5385 0.8196 0.0003 0.2353 1.0000

424,352.69 457658.592101291 902423.175949795 175230.071428571 0

JUMLAH HARGA PERALATAN D. E. F. Note: 1

228499.8015791 375099.24768567 280.8662234515 41230.605042017 0 1169856.7993319

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 6725129.0198771 OVERHEAD & PROFIT 15.0 % x D 1008769.3529816 HARGA SATUAN PEKERJAAN ( D + E ) 7733898.3728587 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-821 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

: : T.A. 2014 : PENYUSUNAN SISTIM INFORMASI / DATA BASE HARGA SATUAN : SULAWESI UTARA / 15 KABUPATEN / KOTA : 8.2 (1) PERKIRAAN VOL. PEK. : : Galian untuk Bahu Jalan & Pek. MinTOTAL HARGA (Rp.) : : M3 % THD. BIAYA PROYEK :

SATUAN

(L01) (L03)

Jam Jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

1 0.1

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

-

14,285.71 1,714.29

16,000.00

BAHAN

JUMLAH HARGA BAHAN C.

-

PERALATAN

1 2

Dump Truck Alat Bantu

E09

Jam Ls

0.181204819 1

537,060.75 -

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

97,318.00 -

97,318.00

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 113,318.00 OVERHEAD & PROFIT 15 % x D 16,997.70 HARGA SATUAN PEKERJAAN ( D + E ) 130,315.70 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(1) : Marka Jalan Termoplastik : M2

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

0.6000 0.2250 0.0750

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Cat Marka Thermoplastic M17b Minyak Pencair (Thinner) M33 Glass Bead M34

Kg Liter Kg

1.9500 1.0500 0.4500

126,710.00 23,100.00 52,266.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Compressor Dump Truck Alat Bantu

E05 E08

Jam Jam Ls

0.0750 0.0750 1.0000

172,621.19 287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(2) : Marka Jalan Bukan Termoplastic : M2

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

0.6000 0.2250 0.0750

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Cat Marka Thinner Blass Bit

(M17a) (M33) (M34)

Kg Liter Kg

1.9500 1.0500 0.4500

95,060.00 23,100.00 52,266.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Compressor Dump Truck Alat Bantu

E05 E08

Jam Jam Ls

0.0750 0.0750 1.0000

172,621.19 287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(3) .(a) PERKIRAAN VOL. PEK. : Rambu Jalan Tunggal dengan Permukaan Pema TOTAL HARGA (Rp.) : BH % THD. BIAYA PROYEK

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.6217 0.3730 0.1243

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4.

Pelat Rambu Pipa Galvanis Dia.1,6" Beton K-175 Cat, dan bahan lainnya

(M35a) (M24) (M60)

BH Batang M3 Ls

1.0000 1.0000 0.0160 1.0000

193,600.00 100,000.00 2,023,647.67 0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Dump Truck Alat Bantu

E08

Jam Ls

0.1243 1.0000

287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(3) .(b) PERKIRAAN VOL. PEK. : Rambu Jalan Ganda dengan Permukaan Peman TOTAL HARGA (Rp.) : BH % THD. BIAYA PROYEK

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.7460 0.3730 0.1243

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4.

Pelat Rambu Pipa Galvanis Dia.1,6" Beton K-175 Cat, dan bahan lainnya

(M35a) (M24) (M60)

BH Batang M3 Ls

2.0000 1.0000 0.0160 1.0000

193,600.00 100,000.00 2,023,647.67 0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Dump Truck Alat Bantu

E08

Jam Ls

0.1243 1.0000

287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(4) .(a) PERKIRAAN VOL. PEK. : Rambu Jalan Tunggal dengan Permukaan Peman TOTAL HARGA (Rp.) : BH % THD. BIAYA PROYEK

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.6217 0.3730 0.1243

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4.

Pelat Rambu Pipa Galvanis Dia.1,6" Beton K-175 Cat, dan bahan lainnya

(M35b) (M24) (M60)

BH Batang M3 Ls

1.0000 1.0000 0.0160 1.0000

238,150.00 100,000.00 2,023,647.67 0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Dump Truck Alat Bantu

E08

Jam Ls

0.1243 1.0000

287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(4) .(b) PERKIRAAN VOL. PEK. : Rambu Jalan Ganda dengan Permukaan Pemant TOTAL HARGA (Rp.) : BH % THD. BIAYA PROYEK

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.6217 0.3730 0.1243

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4.

Pelat Rambu Pipa Galvanis Dia.1,6" Beton K-175 Cat, dan bahan lainnya

(M35b) (M24) (M60)

BH Batang M3 Ls

2.0000 1.0000 0.0160 1.0000

238,150.00 100,000.00 2,023,647.67 0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Dump Truck Alat Bantu

E08

Jam Ls

0.1243 1.0000

287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(5) : Patok Pengarah : BH

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

0.5173 0.2586 0.0647

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Beton K-175 (M60) Baja Tulangan (M39) Cat, dan material lainnya

M3 Kg Ls

0.0354 4.6512 1.0000

2,023,647.67 13,315.00 0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Dump Truck Alat Bantu

E08

Jam Ls

0.0647 1.0000

287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(6) .(a) : Patok Kilometer : BH

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

0.3717 0.1487 0.0743

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Beton K-175 (M60) Baja Tulangan (M39) Cat, dan material lainnya

M3 Kg Ls

0.1512 18.9000 1.0000

2,023,647.67 13,315.00 0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Dump Truck Alat Bantu

E08

Jam Ls

0.0743 1.0000

287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(6) .(b) : Patok Hektometer : BH

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

0.3717 0.1487 0.0743

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Beton K-175 (M60) Baja Tulangan (M39) Cat, dan material lainnya

M3 Kg Ls

0.0630 7.8750 1.0000

2,023,647.67 13,315.00 0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Dump Truck Alat Bantu

E08

Jam Ls

0.0743 1.0000

287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(7) : Rel Pengaman : M'

KOMPONEN

A.

PEKERJA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

1.3724 0.3431 0.1716

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4.

Rel Pengaman Patok Beton K-175 Baja Tulangan Baut, dan material lain

(M36) (M38) (M39)a

M' buah buah buah

1.0000 0.0929 4.6452 1.0000

412,500.00 2,023,647.67 11,440.00 0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Dump Truck Alat Bantu

E08

Jam Ls

0.1716 1.0000

287,873.37 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(8) : Paku Jalan : BH

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

1.7500 0.7000 0.3500

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Beton K-175 (M60) Paku jalan Cat, dan material lainnya

M3 Ls

0.0630 1.0000 1.0000

2,023,647.67 20,220.00 0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1

Alat Bantu

Ls

1.0000

0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(9) : Mata Kucing : BH

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

1.7500 0.7000 0.3500

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Beton K-175 (M60) Mata kucing Cat, dan material lainnya

M3 Kg Ls

0.0630 1.0000 1.0000

2,023,647.67 86,630.00 0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(12) : Perkerasan Blok Beton pada Trotoar dan Medi : M2

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

0.40 1.61 2.41

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Paving Blok Pasir Angker

M2 M3 Kg

1.05 0.05 0.50

0.00 213,000.00 0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Tamper Alat Bantu

E25

Jam Ls

0.24 1.00

58,600.29 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(11) : Kerb Pracetak yang digunakan kembali : M

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

1.2048 0.4016 0.2008

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2

Mortar Material lainnya

M3 Ls

0.0165 1.0000

1,136,905.08 0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Concrete Mixer Alat Bantu

E06

Jam Ls

0.0778 1.0000

260,700.00 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa El-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(10).(a) : Kerb Pracetak Jenis 1 (Peninggi/Mountable) : M'

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

0.35 0.14 0.03

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Beton K-300

M3

0.0551

2,200,182.74

2

Mortar

M3

0.0079

0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Flat Bed Truck Alat Bantu

E11

Jam Ls

0.035 1.000

457,552.91 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa El-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(10).(b) : Kerb Pracetak Jenis 2 (Penghalang/Barrier) : M'

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

0.35 0.14 0.04

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Beton K-300

M3

0.0630

2,200,182.74

2

Mortar

M3

0.0158

0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Flat Bed Truck Alat Bantu

E11

Jam Ls

0.035 1.000

457,552.91 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa El-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(10).(c) : Kerb Pracetak Jenis 3 (Kerb Berparit/Gutter) : M'

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

0.35 0.14 0.04

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Beton K-300

M3

0.0664

2,200,182.74

2

Mortar

M3

0.0131

0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Flat Bed Truck Alat Bantu

E11

Jam Ls

0.035 1.000

457,552.91 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa El-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(10).(d) PERKIRAAN VOL. PEK. : Kerb Pracetak Jenis 4 (Penghalang Berparit) t= TOTAL HARGA (Rp.) : M' % THD. BIAYA PROYEK

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.36 0.15 0.04

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Beton K-300

M3

0.0798

2,200,182.74

2

Mortar

M3

0.0105

0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Flat Bed Truck Alat Bantu

E11

Jam Ls

0.036 1.000

457,552.91 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa El-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(10).(e) PERKIRAAN VOL. PEK. : Kerb Pracetak Jenis 5 (Penghalang Berparit) t= TOTAL HARGA (Rp.) : M' % THD. BIAYA PROYEK

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.36 0.15 0.04

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Beton K-300

M3

0.0977

2,200,182.74

2

Mortar

M3

0.0158

0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Flat Bed Truck Alat Bantu

E11

Jam Ls

0.036 1.000

457,552.91 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa El-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(10).(f) : Kerb Pracetak Jenis 6 (Kerb dengan bukaan) : Buah

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

0.36 0.15 0.04

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Beton K-300

M3

0.0246

2,200,182.74

2

Mortar

M3

0.0105

0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Flat Bed Truck Alat Bantu

E11

Jam Ls

0.036 1.000

457,552.91 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa El-8 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : Pembangunan Jalan /Jbt Kota Manado : SULUT/Kota Manado : 8.4.(10).(g) PERKIRAAN VOL. PEK. : Kerb Pracetak Jenis 7a (Kerb pd pelandaian trotTOTAL HARGA (Rp.) : Buah % THD. BIAYA PROYEK

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.45 0.18 0.05

: : :

JUMLA HARG (Rp.

14,285.71 17,857.14 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Beton K-300

M3

0.3316

2,200,182.74

2

Mortar

M3

0.0294

0.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Flat Bed Truck Alat Bantu

E11

Jam Ls

0.045 1.000

457,552.91 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

3 4

dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-841

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 394,761.99 0.05

JUMLAH HARGA (Rp.)

8,571.43 4,017.86 1,285.71 13,875.00

247,084.50 24,255.00 23,519.70

294,859.20

12,946.59 21,590.50 0.00

34,537.09

343,271.29 51,490.69 394,761.99 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-842

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 323,786.86 0.04

JUMLAH HARGA (Rp.)

8,571.43 4,017.86 1,285.71 13,875.00

185,367.00 24,255.00 23,519.70

233,141.70

12,946.59 21,590.50 0.00

34,537.09

281,553.79 42,233.07 323,786.86 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa LI-843a

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 436,360.27 0.05

JUMLAH HARGA (Rp.)

8,880.95 6,660.71 2,131.43 17,673.10

193,600.00 100,000.00 32,378.36 0.00

325,978.36

35,792.26 0.00

35,792.26

379,443.71 56,916.56 436,360.27 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa LI-843b

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 661,042.89 0.08

JUMLAH HARGA (Rp.)

10,657.14 6,660.71 2,131.43 19,449.29

387,200.00 100,000.00 32,378.36 0.00

519,578.36

35,792.26 0.00

35,792.26

574,819.90 86,222.99 661,042.89 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa LI-844a

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 487,592.77 0.06

JUMLAH HARGA (Rp.)

8,880.95 6,660.71 2,131.43 17,673.10

238,150.00 100,000.00 32,378.36 0.00

370,528.36

35,792.26 0.00

35,792.26

423,993.71 63,599.06 487,592.77 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa LI-844b

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 761,465.27 0.09

JUMLAH HARGA (Rp.)

8,880.95 6,660.71 2,131.43 17,673.10

476,300.00 100,000.00 32,378.36 0.00

608,678.36

35,792.26 0.00

35,792.26

662,143.71 99,321.56 761,465.27 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-845

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 190,179.33 0.02

JUMLAH HARGA (Rp.)

7,389.56 4,618.47 1,108.43 13,116.47

71,713.01 61,930.35 0.00

133,643.37

18,613.50 0.00

18,613.50

165,373.33 24,806.00 190,179.33 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-846a

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 676,506.12 0.08

JUMLAH HARGA (Rp.)

5,309.52 2,654.76 1,274.29 9,238.57

305,975.53 251,653.50 0.00

557,629.03

21,398.59 0.00

21,398.59

588,266.19 88,239.93 676,506.12 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-846b

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 302,429.98 0.04

JUMLAH HARGA (Rp.)

5,309.52 2,654.76 1,274.29 9,238.57

127,489.80 104,855.63 0.00

232,345.43

21,398.59 0.00

21,398.59

262,982.59 39,447.39 302,429.98 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-847

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 841,459.74 0.10

JUMLAH HARGA (Rp.)

19,606.35 6,126.98 2,940.95 28,674.29

412,500.00 188,003.02 53,140.54 0.00

653,643.56

49,386.28 0.00

49,386.28

731,704.12 109,755.62 841,459.74 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-848

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 219,891.27 0.03

JUMLAH HARGA (Rp.)

25,000.00 12,500.00 6,000.00 43,500.00

127,489.80 20,220.00 0.00

147,709.80

0.00

0.00

191,209.80 28,681.47 219,891.27 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-849

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 296,262.77 0.04

JUMLAH HARGA (Rp.)

25,000.00 12,500.00 6,000.00 43,500.00

127,489.80 86,630.00 0.00

214,119.80

0.00

0.00

257,619.80 38,642.97 296,262.77 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-8412

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 116,189.73 0.01

JUMLAH HARGA (Rp.)

5,737.23 28,686.17 41,308.09 75,731.50

0.00 11,182.50 0.00

11,182.50

14,120.55 0.00

14,120.55

101,034.55 15,155.18 116,189.73 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa EI-8411

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 76,901.64 0.01

JUMLAH HARGA (Rp.)

m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

17,211.70 7,171.54 3,442.34 27,825.59

18,758.93 0.00

18,758.93

20,286.47 0.00

20,286.47 66,870.99 10,030.65 76,901.64

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa El-8410a

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 166,967.24 0.02

JUMLAH HARGA (Rp.)

4,956.35 2,478.17 594.76 8,029.29

121,285.07 0.00

121,285.07

15,874.54 0.00

15,874.54

145,188.90 21,778.34 166,967.24 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa El-8410b

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 187,501.56 0.02

JUMLAH HARGA (Rp.)

5,066.14 2,533.07 607.94 8,207.14

138,611.51 0.00

138,611.51

16,226.18 0.00

16,226.18

163,044.84 24,456.73 187,501.56 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa El-8410c

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 196,135.91 0.02

JUMLAH HARGA (Rp.)

5,066.14 2,533.07 607.94 8,207.14

146,119.64 0.00

146,119.64

16,226.18 0.00

16,226.18

170,552.96 25,582.94 196,135.91 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa El-8410d

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 230,770.24 0.03

JUMLAH HARGA (Rp.)

5,203.37 2,601.69 624.40 8,429.46

175,574.58 0.00

175,574.58

16,665.73 0.00

16,665.73

200,669.78 30,100.47 230,770.24 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa El-8410e

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 275,934.49 0.03

JUMLAH HARGA (Rp.)

5,203.37 2,601.69 624.40 8,429.46

214,847.84 0.00

214,847.84

16,665.73 0.00

16,665.73

239,943.04 35,991.46 275,934.49 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa El-8410f

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 91,026.74 0.01

JUMLAH HARGA (Rp.)

5,203.37 2,601.69 624.40 8,429.46

54,058.49 0.00

54,058.49

16,665.73 0.00

16,665.73 79,153.68 11,873.05 91,026.74

m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

Analisa El-8410g

FORMULIR STANDAR UNTUK N ANALISA MASING-MASING HARGA SATUAN

1.00 874,808.47 0.11

JUMLAH HARGA (Rp.)

6,438.49 3,219.25 772.62 10,430.36

729,651.00 0.00

729,651.00

20,621.66 0.00

20,621.66

760,703.02 114,105.45 874,808.47 m operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

rkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan

Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali si/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

uaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: : : : : 9.4 : PEKERJAAN HARIAN DUMP TRUCK 3-4 M3 : JAM E08

SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

DUMP TRUCK 3-4 M3 -

D. E. F. Note: 1 2

3 4

SATUAN

PERKIRAAN KUANTITAS

-

-

jam jam

1.0000 -

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: : : : : 9.5 : PEKERJAAN HARIAN FLAT BED TRUCK 3-4 M3 : JAM (E11)

SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

FLAT BED TRUCK 3-4 M3

-

D. E. F. Note: 1 2

3

SATUAN

PERKIRAAN KUANTITAS

-

-

jam jam

1.0000 -

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

4

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 9.6 : PEKERJAAN HARIAN WATER TANKER 3000-4500 L. : JAM (E23)

KOMPONEN

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

WATER TANKER 3000-4500 L.

-

D. E. F. Note: 1 2

SATUAN

PERKIRAAN KUANTITAS

-

-

jam jam

1.0000 -

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: : : : : 9.7 : PEKERJAAN HARIAN BULLDOZER 100-150 HP : JAM (E04)

SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

BULLDOZER 100-150 HP

-

D. E. F. Note: 1 2

SATUAN

PERKIRAAN KUANTITAS

-

-

jam jam

1.0000 -

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: : : : : 9.8 : PEKERJAAN HARIAN MOTOR GRADER >100 HP : JAM (E13)

SATUAN PEMBAYARAN

NO.

KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

MOTOR GRADER >100 HP

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

-

-

-

jam jam

1.0000 -

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: : : : : 9.9 : PEKERJAAN HARIAN WHEEL LOADER 1.0-1.6 M3 : JAM (E15)

SATUAN PEMBAYARAN

NO.

KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

WHEEL LOADER 1.0-1.6 M3

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

-

-

-

jam jam

1.0000 -

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: : : : : 9.10 : PEKERJAAN HARIAN TRACK LOADER 75-100 HP : JAM (E14)

SATUAN PEMBAYARAN

NO.

KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

TRACK LOADER 75-100 HP

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

-

-

-

jam jam

1.0000 -

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: : : : : 9.11 : PEKERJAAN HARIAN EXCAVATOR 80-140 HP : JAM (E10)

SATUAN PEMBAYARAN

NO.

KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

EXCAVATOR 80-140 HP

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

-

-

-

jam jam

1.0000 -

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: : : : : 9.12 : PEKERJAAN HARIAN CRANE 10-15 TON : JAM (E07)

SATUAN PEMBAYARAN

NO.

KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

CRANE 10-15 TON -

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

-

-

jam jam

1.0000 -

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 9.13 : PEKERJAAN HARIAN STEEL WHEEL ROLLER 6-9 T. : JAM (E16)

KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

STEEL WHEEL ROLLER 6-9 T.

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

-

-

-

jam jam

1.0000 -

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: : : : : 9.14 : PEKERJAAN HARIAN VIBRATORY ROLLER 5-8 T. : JAM (E19)

SATUAN PEMBAYARAN

NO.

KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

VIBRATORY ROLLER 5-8 T.

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

-

-

-

jam jam

1.0000 -

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: : : : : 9.15 : PEKERJAAN HARIAN VIBRATORY COMPACTOR : JAM (E25)

SATUAN PEMBAYARAN

NO.

KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

VIBRATORY COMPACTOR

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

-

-

-

jam jam

1.0000 -

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: : : : : 9.16 : PEKERJAAN HARIAN TIRE ROLLER 8-10 T. : JAM (E18)

SATUAN PEMBAYARAN

NO.

KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

TIRE ROLLER 8-10 T. -

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

-

-

jam jam

1.0000 -

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 9.17 : PEKERJAAN HARIAN COMPRESSOR 4000-6500 L\M : JAM (E05)

KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

COMPRESSOR 4000-6500 L\M

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

-

-

-

jam jam

1.0000 -

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 9.18 : PEKERJAAN HARIAN CONCRETE MIXER 0.3-0.6 M3 : JAM (E06)

KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

CONCRETE MIXER 0.3-0.6 M3

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

-

-

-

jam jam

1.0000 -

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: : : : : 9.19 : PEKERJAAN HARIAN WATER PUMP 70-100 mm : JAM (E22)

SATUAN PEMBAYARAN

NO.

KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

WATER PUMP 70-100 mm

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

-

-

-

jam jam

1.0000 -

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 9.20 : PEKERJAAN HARIAN JACK HAMMER : JAM E26

KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

C.

ALAT

1. 2.

JACK HAMMER

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT 15.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

-

-

-

jam jam

1.0000 -

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-94

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

287,873.37 -

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

287,873.37 -

287,873.37 43,181.01 331,054.38

Analisa EI-95

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

457,552.91 -

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator.

457,552.91 -

457,552.91 68,632.94 526,185.84

kaitan (tetapi tidak termasuk PPN

Analisa EI-96

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

243,811.40 -

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali

243,811.40 -

243,811.40 36,571.71 280,383.10

m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-97

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

712,047.39 -

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang

712,047.39 -

712,047.39 106,807.11 818,854.50

dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-98

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

659,813.19 -

659,813.19 -

659,813.19 98,971.98 758,785.16

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-99

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

533,941.26 -

533,941.26 -

533,941.26 80,091.19 614,032.45

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-910

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

288,315.42 -

288,315.42 -

288,315.42 43,247.31 331,562.73

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-911

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

563,192.52 -

563,192.52 -

563,192.52 84,478.88 647,671.39

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-912

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

625,016.51 -

625,016.51 -

625,016.51 93,752.48 718,768.98

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-913

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

457,658.59 -

457,658.59 -

457,658.59 68,648.79 526,307.38

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-914

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

404,914.14 -

404,914.14 -

404,914.14 60,737.12 465,651.27

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-915

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

58,600.29 -

58,600.29 -

58,600.29 8,790.04 67,390.34

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-916

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

424,352.69 -

424,352.69 -

424,352.69 63,652.90 488,005.60

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-917

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

172,621.19 -

172,621.19 -

172,621.19 25,893.18 198,514.37

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-918

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

175,230.07 -

175,230.07 -

175,230.07 26,284.51 201,514.58

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-919

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

51,574.72 -

51,574.72 -

51,574.72 7,736.21 59,310.93

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-920

UNTUK ING HARGA SATUAN

PERKIRAAN VOL. PEK. : : TOTAL HARGA (Rp.) % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

0.00 0.00 0.00

JUMLAH HARGA (Rp.)

-

-

-

-

47,194.27 -

47,194.27 -

47,194.27 7,079.14 54,273.42

eralatan, volume dan/atau ukuran

yelesaikan satu satuan pekerjaan a Jasa tidak dapat diubah kecuali m Instruksi Kepada Peserta Lelang dipakai dan operator. kaitan (tetapi tidak termasuk PPN

Analisa EI-1011 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROPINSI ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 10.1 (1) : Pemeliharaan Rutin Perkerasan : Lump Sum / Bulan

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

252.0000 50.4000

% THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4.

Camp. Aspal Panas Camp. Aspal Dingin Aspal Pengisian Retak Bahan-bahan lainnya

M3 M3 Liter LS

3.6000 3.6000 338.0000 1.0000

1,638,004.11 2,677,784.97 15,861.56 8,512,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Motor Grader Flat Bed Truck (E11) Air Compressor (E05)

(E13)

Jam Jam Jam

16.8000 16.8000 16.8000

659,813.19 457,552.91 172,621.19

JUMLAH HARGA PERALATAN D. E. F. G. H.

Jumlah harga Tenaga, Bahan dan Peralatan : ( A + B + C ) Over Head and Profit : 15.0 % x D Harga Lump Sum : ( D + E ) Harga Lump Sum / bulan untuk 3 bulan pertama : F / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan = 5/8 x { F / (Periode Pelaksanaan - 3) }

:

JUMLAH HARGA (Rp.)

Note: 1 2 3

Perkiraan kuantitas yang dicantumkan harus diperkirakan mendekati kondisi sebenarnya. Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.

Analisa EI-1012 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROPINSI ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 10.1 (2) : Pemeliharaan Rutin Bahu Jalan : Lump Sum / Bulan

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

84.0000 16.8000

% THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Lap.Pond.Agg.Kelas B Bahan-bahan lainnya

M3 LS

30.0000 1.0000

1,088,373.83 3,265,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Motor Grader Flat Bed Truck (E11) Roller (E16)

(E13)

Jam Jam Jam

8.4000 8.4000 8.4000

659,813.19 457,552.91 217,811.32

JUMLAH HARGA PERALATAN D. E. F. G. H.

Jumlah harga Tenaga, Bahan dan Peralatan : ( A + B + C ) Over Head and Profit : 15.0 % x D Harga Lump Sum : ( D + E ) Harga Lump Sum / bulan untuk 3 bulan pertama : F / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan = 5/8 x { F / (Periode Pelaksanaan - 3) }

:

JUMLAH HARGA (Rp.)

Note: 1 2 3

Perkiraan kuantitas yang dicantumkan harus diperkirakan mendekati kondisi sebenarnya. Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.

Analisa EI-1013 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROPINSI ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 10.1 (3) : Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan : Lump Sum / Bulan % THD. BIAYA PROYEK :

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

168.0000 33.6000

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Umum

LS

1.0000

6,619,355.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Motor Grader Dump Truck

(E13) (E08)

Jam Jam

33.6000 33.6000

659,813.19 287,873.37

JUMLAH HARGA PERALATAN D. E. F. G. H.

Jumlah harga Tenaga, Bahan dan Peralatan : ( A + B + C ) Over Head and Profit : 15.0 % x D Harga Lump Sum : ( D + E ) Harga Lump Sum / bulan untuk 3 bulan pertama : F / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan = 5/8 x { F / (Periode Pelaksanaan - 3) }

JUMLAH HARGA (Rp.)

Note: 1 2 3

Perkiraan kuantitas yang dicantumkan harus diperkirakan mendekati kondisi sebenarnya. Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.

Analisa EI-1014 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROPINSI ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 10.1 (4) : Pemeliharaan Rutin Perlengkapan Jalan : Lump Sum / Bulan % THD. BIAYA PROYEK

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

42.0000 4.2000

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Umum

LS

1.0000

3,250,595.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Flat Bed Truck

(E11)

Jam

8.4000

457,552.91

JUMLAH HARGA PERALATAN D. E. F. G. H.

Jumlah harga Tenaga, Bahan dan Peralatan : ( A + B + C ) Over Head and Profit : 15.0 % x D Harga Lump Sum : ( D + E ) Harga Lump Sum / bulan untuk 3 bulan pertama : F / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan = 5/8 x { F / (Periode Pelaksanaan - 3) }

:

JUMLAH HARGA (Rp.)

Note: 1 2 3

Perkiraan kuantitas yang dicantumkan harus diperkirakan mendekati kondisi sebenarnya. Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.

Analisa EI-1015 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROPINSI ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 10.1 (5) : Pemeliharaan Rutin Jembatan : Lump Sum / Bulan

PERKIRAAN SATUAN KUANTITAS

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

Jam Jam

504.0000 100.8000

% THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1.

Umum

LS

1.0000

5,946,148.44

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Flat Bed Truck

(E11)

Jam

84.0000

457,552.91

JUMLAH HARGA PERALATAN D. E. F. G. H.

Jumlah harga Tenaga, Bahan dan Peralatan : ( A + B + C ) Over Head and Profit : 15.0 % x D Harga Lump Sum : ( D + E ) Harga Lump Sum / bulan untuk 3 bulan pertama : F / 8 Harga Lump Sum / bulan untuk sisanya selama Periode Pelaksanaan = 5/8 x { F / (Periode Pelaksanaan - 3) }

:

JUMLAH HARGA (Rp.)

Note: 1 2 3

Perkiraan kuantitas yang dicantumkan harus diperkirakan mendekati kondisi sebenarnya. Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.

Analisa EI-1011

6.93

JUMLAH HARGA (Rp.)

3,600,000.00 864,000.00

4,464,000.00

5,896,814.78 9,640,025.89 5,361,207.07 8,512,000.00

29,410,047.74

11,084,861.52 7,686,888.84 2,900,035.99

21,671,786.35 55,545,834.09 8,331,875.11 63,877,709.20 7,984,713.65 7,984,713.65

uk PPN yang dibayarkan

enjadi dasar penetapan Mata jalan dilakukan sesuai jukkan dalam Analisa ini.

Analisa EI-1012

6.67

JUMLAH HARGA (Rp.)

1,200,000.00 288,000.00

1,488,000.00

32,651,214.87 3,265,000.00

35,916,214.87

5,542,430.76 3,843,444.42 1,829,615.07

11,215,490.25 48,619,705.12 7,292,955.77 55,912,660.88 6,989,082.61 6,989,082.61

uk PPN yang dibayarkan

enjadi dasar penetapan Mata jalan dilakukan sesuai jukkan dalam Analisa ini.

Analisa EI-1013

5.69

JUMLAH HARGA (Rp.)

2,400,000.00 576,000.00

2,976,000.00

6,619,355.00

6,619,355.00

22,169,723.04 9,672,545.37

31,842,268.41 41,437,623.41 6,215,643.51 47,653,266.92 5,956,658.37 5,956,658.37

uk PPN yang dibayarkan

enjadi dasar penetapan Mata jalan dilakukan sesuai jukkan dalam Analisa ini.

Analisa EI-1014

1.07

JUMLAH HARGA (Rp.)

600,000.00 72,000.00

672,000.00

3,250,595.00

3,250,595.00

3,843,444.42

3,843,444.42 7,766,039.42 1,164,905.91 8,930,945.33 1,116,368.17 1,116,368.17

uk PPN yang dibayarkan

enjadi dasar penetapan Mata jalan dilakukan sesuai jukkan dalam Analisa ini.

Analisa EI-1015

7.31

JUMLAH HARGA (Rp.)

7,200,000.00 1,728,000.00

8,928,000.00

5,946,148.44

5,946,148.44

38,434,444.21

38,434,444.21 53,308,592.65 7,996,288.90 61,304,881.55 7,663,110.19 7,663,110.19

uk PPN yang dibayarkan

enjadi dasar penetapan Mata jalan dilakukan sesuai jukkan dalam Analisa ini.

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 10.1 (1) : Pemeliharaan Rutin Perkerasan : Lump Sum / Bulan

No.

U RAIAN

KODE

I.

DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Tebal Campuran Aspal Panas/Dingin Rata-rata Tebal Penetrasi Macadam Rata-rata Aplikasi Aspal Pengisian Retak Rata-rata Panjang Jalan Proyek Prosentase permukaan yang perlu dipelihara (Wr < 6m) Prosentase permukaan yang perlu dipelihara (Wr > 6m) Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemeliharaan permukaan Prosentase waktu mandor utk pemeliharaan permukaan Prosentase waktu alat berat untuk pemeliharaan Jumlah Pekerja 3.00 regu kerja @ 5orang Jumlah Mandor

Tk Wr Ws t h Ar Lp Ap1 Ap2 Tp Tpk Tmd Te Pk Md

7.00 4.50 2.00 0.04 0.055 1.50 5.00 1.00 2.00 240.00 1.00 1.00 1.00 15.00 3.00

jam Meter Meter Meter Meter Ltr/M2 Km % % Hari % % % orang orang

(L01) (L03)

252.00 50.40

Jam Jam

3.60 3.60 2.48 338 10.00

M3 M3 M3 Liter %

16.80 16.80 16.80

Jam Jam Jam

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

II.

KOEF.

SATUAN

KETERANGAN

Retak sedang Thd. Total Luas Thd. Total Luas Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu

PEKERJA 1 2

III.

Kebutuhan Pekerja Kebutuhan Mandor

= Pk x Tpk x Tp x Tk = Md x Tmd x Tp x Tk

BAHAN 1 2 3 4 5

IV.

Camp. Aspal Panas = (Ap x t x Wr x Lp x 1000) x % Camp. Aspal Dingin = (Ap x t x Wr x Lp x 1000) x % Penetrasi Macadam = (Ap x h x Wr x Lp x 1000) x % Aspal Pengisi Retak = Ar x Ap x Wr x Lp x 1000 Bahan-bahan lainnya (diasumsikan)

(EI-10B) (EI-10D) (EI-10C) (EI-10E)

ALAT 1 2 3

Motor Grader Flat Bed Truck Air Compressor

= Te x Tp x Tk = Te x Tp x Tk = Te x Tp x Tk

(E13) (E11) (E05)

40% 40% 20% Thd.Biaya Bahan

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 10.1 (2) : Pemeliharaan Rutin Bahu Jalan : Lump Sum / Bulan

No.

U RAIAN

KODE

I.

DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Tebal Agregat Base Kelas B untuk bahu jalan Aplikasi Aspal Pengisian Retak Panjang Jalan Proyek Prosentase permukaan bahu yang dipelihara (Ws < 3m) Prosentase permukaan bahu yang dipelihara (Ws > 3m) Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemeliharaan bahu jln Prosentase waktu mandor utk pemeliharaan bahu jln Prosentase waktu alat berat untuk pemeliharaan Jumlah Pekerja 2.00 regu kerja @ 5orang Jumlah Mandor

Tk Wr Ws t Ar Lp As1 As2 Tp Tpk Tmd Te Pk Md

7.00 4.50 2.00 0.15 0.50 5.00 2.00 4.00 240.00 0.50 0.50 0.50 10.00 2.00

jam Meter Meter Meter Ltr/M2 Km % % Hari % % % orang orang

(L01) (L03)

84.00 16.80

Jam Jam

(EI-10A)

30.00 10.00

M3 %

8.40 8.40 8.40

Jam Jam Jam

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

II.

KOEF.

SATUAN

KETERANGAN

Thd. Total Luas Thd. Total Luas Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu

PEKERJA 1 2

III.

Kebutuhan Pekerja Kebutuhan Mandor

= Pk x Tpk x Tp x Tk = Md x Tpk x Tp x Tk

BAHAN 1 2

IV.

Lap.Pond.Agr.Kls.B = As x t x Ws x Lp x 1000 Bahan-bahan lainnya (diasumsikan)

ALAT 1 2 3

Motor Grader Flat Bed Truck Roller

= Te x Tp x Tk = Te x Tp x Tk = Te x Tp x Tk

(E13) (E11) (E16)

Thd.Biaya Bahan

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 10.1 (3) : Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan : Lump Sum / Bulan

No.

U RAIAN

KODE

I.

DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Lebar Saluran/Selokan Rata-rata Timbunan Pilihan diperlukan untuk selokan/sal.air Pas.Bt.Dgn.Mortar diperlukan untuk selokan/sal.air Panjang Jalan Proyek Prosentase saluran yang dipelihara (Wsd < 1m) Prosentase saluran yang dipelihara (Wsd > 1m) Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemeliharaan saluran air Prosentase waktu mandor utk pemeliharaan saluran air Prosentase waktu alat berat untuk pemeliharaan Jumlah Pekerja 2.00 regu kerja @ 5orang Jumlah Mandor

Tk Wr Ws Wsd Vtp Vpb Lp Ad1 Ad2 Tp Tpk Tmd Te Pk Md

7.00 4.50 2.00 0.60 220.00 330.00 5.00 0.50 1.00 240.00 1.00 1.00 2.00 10.00 2.00

jam Meter Meter Meter M3/Km M3/Km Km % % Hari % % % orang orang

(L01) (L03)

168.00 33.60

Jam Jam

(EI-22)

8.25 5.50 10.00

M3 M3 %

33.60 33.60

Jam Jam

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

II.

KOEF.

SATUAN

KETERANGAN

Thd.Total Pjg.Jln Thd.Total Pjg.Jln Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu

PEKERJA 1 2

III.

Kebutuhan Pekerja Kebutuhan Mandor

= Pk x Tpk x Tp x Tk = Md x Tpk x Tp x Tk

BAHAN 1

IV.

Bahan Umum, antara lain : a. Pasangan Batu Dgn. Mortar = Ad x Lp x Vpb b. Bahan Timbunan Pilihan = Ad x Lp x Vtp c. Bahan-bahan lainnya (diasumsikan)

(EI-323)

ALAT 1 2

Motor Grader Dump Truck

= Te x Tp x Tk = Te x Tp x Tk

(E13) (E08)

Thd.Biaya Bahan

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 10.1 (4) : Pemeliharaan Rutin Perlengkapan Jalan : Lump Sum / Bulan

U RAIAN

I. 1 2 3 4 5 6 7 8 9 10 11

II.

DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Lebar Saluran/Selokan Rata-rata Panjang Jalan Proyek Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemel. perlengk. jalan Prosentase waktu mandor utk pemel. perlengk. Jalan Prosentase waktu alat berat untuk pemeliharaan Jumlah Pekerja 1.00 regu kerja @ 5orang Jumlah Mandor

KODE

KOEF.

SATUAN

Tk Wr Ws Wsd Lp Tp Tpk Tmd Te Pk Md

7.00 4.50 2.00 0.60 5.00 240.00 0.50 0.25 0.50 5.00 1.00

jam Meter Meter Meter Km Hari % % % orang orang

(L01) (L03)

42.00 4.20

Jam Jam

(M42) (M12) (M01) -

10.00 100.00 5.00 100.00

Kg Kg M3 %

(E11)

8.40

Jam

KETERANGAN

Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu

PEKERJA 1 2

III.

Kebutuhan Pekerja Kebutuhan Mandor

= Pk x Tpk x Tp x Tk = Md x Tpk x Tp x Tk

BAHAN 1

IV.

Bahan Umum, antara lain : a. Cat 2.00 kg per KM b. Semen 20.00 kg per KM b. Pasir 1.00 M3 per KM c. Bahan-bahan lainnya (diasumsikan) ALAT

1

Flat Bed Truck

= Te x Tp x Tk

433,300.00 126,997.50 1,065,000.00 Thd.Biaya Bahan

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 10.1 (5) : Pemeliharaan Rutin Jembatan : Lump Sum / Bulan

U RAIAN

I. 1 2 3 4 5 6 7 8 9 10 11 12 13

II.

DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Rata-rata Jumlah Jembatan per Km panjang jalan Rata-rata Bentang Jembatan Rata-rata Lebar Jembatan Panjang Jalan Proyek Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemeliharaan jembatan Prosentase waktu mandor utk pemeliharaan jembatan Prosentase waktu alat berat untuk pemel. jembatan Jumlah Pekerja 3.00 regu kerja @ 5orang Jumlah Mandor

KODE

KOEF.

SATUAN

Tk Wr Ws Kj Lj Wj Lp Tp Tpk Tmd Te Pk Md

7.00 4.50 2.00 3.00 15.00 6.50 5.00 240.00 2.00 2.00 5.00 15.00 3.00

jam Meter Meter Buah Meter Meter Km Hari % % % orang orang

(L01) (L03)

504.00 100.80

Jam Jam

(M42) (M12) (M01) -

75.00 750.00 2.60 25.00

Kg Kg M3 %

(E13) (E08)

84.00 84.00

Jam Jam

KETERANGAN

Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu

PEKERJA 1 2

III.

Kebutuhan Pekerja Kebutuhan Mandor

= Pk x Tpk x Tp x Tk = Md x Tpk x Tp x Tk

BAHAN 1

IV.

Bahan Umum, antara lain : a. Cat 0.33 kg per M' jembatan b. Semen 3.33 kg per M' jembatan b. Pasir 0.01157 M3 per M' jembatan c. Bahan-bahan lainnya (diasumsikan) ALAT

1 2

Motor Grader Dump Truck

= Te x Tp x Tk = Te x Tp x Tk

3,249,750.00 952,481.25 554,687.50 Thd.Biaya Bahan

1 JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I. 1 2 3 4 5 6 7 8

II. 1 2 3 4

III. 1.

2. 2.a.

: 10.A : Pondasi Agregat Kls. B Untuk Pek. Rutin : M3

U RAIAN

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : setempat2 di sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal lapis agregat padat Jam kerja efektif per-hari Berat isi padat Berat volume agregat (lepas)

KODE

KOEF.

SATUAN

L t Tk Bip Bil

25.0 0.15 7.00 1.81 1.51

KM M jam ton/m3 ton/m3

M27

1.0000

M3

1.50 0.85 0.83

M3 -

1.00 1.00 2.00

menit menit menit

URUTAN KERJA Wheel Loader mencampur & memuat Agregat ke dalam Dump Truck di Base Camp Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan pekerja Hamparan Agregat dibasahi dengan Water Tank Truck sebelum dipadatkan dengan Pedestrian Roller Sekelompok pekerja membuat galian lubang/patching, merapikan tepi hamparan dan level permukaan dengan menggunakan Alat Bantu PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agregat B

ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Mencampur - Memuat dan lain-lain

(E15) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = Koefisien Alat / M3 2.b.

URAIAN ANALISA HARG

V x Fb x Fa x 60 (Bip/Bil) x Ts1 = 1 : Q1

DUMP TRUCK Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu Siklus : - Waktu memuat = V x (60/Q1) x Bil - Waktu tempuh isi = (L : v1) x 60 menit - Waktu tempuh kosong = (L : v2) x 60 menit - Lain-lain (termasuk dumping setempat-setempat)

Q1

105.94

M3

(E15)

0.0094

jam

(E08) V Fa v1 v2 T1 T2 T3 T4

3.5 0.83 22.00 30.00 2.9931490669 68.18 50.00 2.00

ton KM/jam KM/jam menit menit menit menit

Ts2

123.17

menit

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 10.A : Pondasi Agregat Kls. B Untuk Pek. Rutin : M3

No.

U RAIAN

Kap. Prod. / jam = Koefisien Alat / M3 2.c.

URAIAN ANALISA HARG

KODE

V x Fa x 60 (Bip/Bil) x Ts2 = 1 : Q2

Q2

PEDESTRIAN ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Faktor Efisiensi alat Kap. Prod. / jam =

(v x 1000) x b x t x Fa

Koefisien Alat / M3

= 1 : Q3

KOEF.

SATUAN

0.52

M3

(E09)

1.9314

jam

(E24) v b n Fa

1.50 0.61 6.00 0.83

KM/jam M lintasan -

Q3

18.99

M3

(E24)

0.0527

jam

(E23) V Wc pa Fa

4.00 M3 0.07 M3 100.00 liter/menit 0.83 -

n

2.d.

WATER TANK TRUCK Volume tanki air Kebutuhan air / M3 agregat padat Kapasitas pompa air Faktor Efisiensi alat Kap. Prod. / jam =

pa x Fa x 60

Q4

71.14

M3

(E23)

0.0141

jam

Q1 Qt

105.94 741.59

M3/jam M3

P M

15.00 1.00

orang orang

(L01) (L03)

0.1416 0.0094

jam jam

Wc x 1000

2.e.

3.

Koefisien Alat / M3

= 1 : Q4

ALAT BANTU Diperlukan : - Kereta dorong - Sekop - Garpu

= 5 buah = 5 buah = 5 buah

TENAGA Produksi menentukan : WHEEL LOADER Produksi agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / M3 : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 10.A : Pondasi Agregat Kls. B Untuk Pek. Rutin : M3

U RAIAN

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

1,251,629.90 / M3.

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 120.00 M3

URAIAN ANALISA HARG

KODE

KOEF.

SATUAN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I. 1 2 3 4 5 6 7 8 9 10

11

11 II. 1 2

3

4

III. 1. 1.a. 1.b. 1.c. 1.d.

2. 2.a.

: 10.B : Camp. Aspal Panas Utk.Pek.Rutin : M3

U RAIAN

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal Lapis Hotmix padat Jam kerja efektif per-hari Faktor kehilanganmaterial : - Agregat - Aspal Berat isi padat Berat Isi Agregat (lepas) Komposisi campuran AC-WC : - Agr Pch Mesin 5 - 10 & 10 - 15 mm - Agregat Pecah Mesin 0 - 5 mm - Semen - Asphalt Berat Isi bahan : - AC-WC - Agr Pch Mesin 5 - 10 & 10 - 15 mm - Agr Pch Mesin 0 - 5 mm Jarak Stock pile ke Cold Bin

URAIAN ANALISA HARG

KODE

KOEF.

SATUAN

L t Tk Fh1 Fh2 Bip Bil

25.0 0.04 7.00 1.05 1.03 1.81 1.51

KM M Jam ton/m3 ton/m3

5-10&10-15

0-5 FF As

44.7 48.00 1.90 5.40

% % % %

D1 D2 D3 l

2.32 1.42 1.57 50.00

ton / M3 ton / M3 ton / M3 m

(M92) (M91) (M05) (M10)

0.0307 0.0298 1.8514 5.1615

M3 M3 Kg Kg

(E15) V Fb Fa Vf Vr

1.50 0.85 0.83 15.00 20.00

M3 km/jam km/jam

URUTAN KERJA Wheel Loader memuat Agregat dan Aspal ke dalam Cold Bin AMP Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan Penghamparan dilaksanakan manual oleh pekerja untuk keperluan penambalan/patching kecil2 dan dipadatkan dengan Pedestrian Roller Sekelompok pekerja membuat galian lubang/patching, merapikan tepi hamparaan dengan menggunakan Alat Bantu PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agr 5-10 & 10-15 Agr 0-5 Semen Aspal

ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor efisiensi alat Kecepatan maju Kecepatan kembali

= ("5-10 & 10-15" x (D1 x tM3) x Fh1) : D2 = ("0-5" x (D1 x tM3) x Fh1) : D3 = (FF x (D1 x tM3) x Fh1) x 1000 = (AS x (D1 x tM3) x Fh2) x 1000

Waktu siklus ((l x 60 : (Vf x 1000)) + (l x 60 : (Vr x 1000))) + 0.75

Ts1

1.10

menit

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 10.B : Camp. Aspal Panas Utk.Pek.Rutin : M3

No.

2.b.

U RAIAN

V x Fb x Fa x 60 Fh1 x (Bip/Bil) x Ts1

Koefisien Alat/M3

= 1 : Q1

2.d.

Q1

(E15)

ASPHALT MIXING PLANT (AMP) Kapasitas produksi Faktor Efisiensi alat

Koefisien Alat/M3 2.c.

KODE

Kap. Prod. / jam =

Kap.Prod. / jam =

URAIAN ANALISA HARG

(E01) V Fa

V x Fa D1 = 1 : Q2

GENERATORSET ( GENSET ) Kap.Prod. / Jam = SAMA DENGAN AMP Koefisien Alat/M3 = 1 : Q3 DUMP TRUCK (DT) Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Kapasitas AMP / batch Waktu menyiapkan 1 batch AC Waktu Siklus - Mengisi Bak = (V : Q2b) x Tb - Angkut = (L : v1) x 60 menit - Tunggu + dump + Putar - Kembali = (L : v2) x 60 menit

KOEF.

SATUAN

45.86 M3

0.0218

Jam

60.0 ton / Jam 0.83 -

Q2

21.47

M3

(E01)

0.0466

Jam

(E12) Q3 (E12)

21.47 0.0466

M3 Jam

(E08) V Fa v1 v2 Q2b Tb Ts2 T1 T2 T3 T4 Ts2

3.5 Ton 0.80 20.00 KM / Jam 30.00 KM / Jam 1.00 Ton 1.00 menit 3.50 75.00 30.00 50.00 158.5

menit menit menit menit menit

0.46

M3

(E09)

2.1888

Jam

ASPHALT FINISHER ( Tidak dipakai ) Kecepatan menghampar Faktor efisiensi alat Lebar hamparan Kap.Prod. / jam = V x Fa x b x t x 60

(E02) V Fa b Q5

0.00 0.00 0.00 0.00

Koefisien Alat/M3

(E02)

0.0000

Kap.Prod. / jam =

V x Fa x 60

Q4 D1 x Ts2

Koefisien Alat/M3 2.e.

2.f.

PEDESTRIAN ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Faktor Efisiensi alat

= 1 : Q4

= 1 : Q5

(E24) v b n Fa

km / jam M M3 Jam

1.50 Km / Jam 0.61 M 6.00 lintasan 0.83 -

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 10.B : Camp. Aspal Panas Utk.Pek.Rutin : M3

U RAIAN

Kap. Prod. / jam =

URAIAN ANALISA HARG

KODE

(v x 1000) x b x t x Fa

Q6

KOEF.

SATUAN

5.06

M3

(E17)

0.1975

Jam

(E18) v b n Fa

5.00 1.20 8.00 0.83

KM / jam M lintasan -

Q7

24.90

M3

(E18)

0.0000

Jam

n Koefisien Alat/M3 2.g.

= 1 : Q6

PNEUMATIC TIRE ROLLER ( tidak dipakai ) Kecepatan rata-rata Lebar efektif pemadatan Jumlah lintasan Faktor Efisiensi alat Kap.Prod./jam =

(v x 1000) x b x t x Fa

Koefisien Alat/M3

= 1 : Q7

n

2.h.

ALAT BANTU diperlukan : - Kereta dorong = 2 buah - Sekop = 4 buah - Garpu = 4 buah - Tongkat Kontrol ketebalan hanparan

3.

TENAGA Produksi menentukan : DUMP TRUCK Produksi ATB / hari = Tk x Q4 Kebutuhan tenaga : - Pekerja - Mandor Koefisien Tenaga / M3

: - Pekerja - Mandor

Q4 Qt P M

= (Tk x P) / Qt = (Tk x M) / Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

1,883,704.72 / M3.

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 16.00 M3

(L01) (L03)

0.46 M3 / Jam 3.20 M3 10.00 2.00

21.8881 4.3776

orang orang

Jam Jam

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 10.C : Penetrasi Macadam Utk.Pek.Rutin : M3

No.

I. 1 2 3 4 5 6 7 8

9

10 II.

U RAIAN

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal rata2 Lapen Jam kerja efektif per-hari Faktor kehilanganmaterial : - Agregat - Aspal Komposisi campuran Lapen (spesifikasi) : - Agregat Pokok - Agregat Pengunci - Aspal : - Paska Agregat Pokok

URAIAN ANALISA HARG

KODE

KOEF.

SATUAN

L t Tk Fh1 Fh2

25.00 0.055 7.00 1.10 1.05

KM M Jam -

Ak Ap As1 As2

133.00 25.00 5.20 94.55

Kg/M2 Kg/M2 Kg/M2 Kg/M3

Berat jenis bahan : - Agregat - Aspal

D1 D2

1.80 1.01

Faktor kembang Aggregat

Fk

1.20

ton / M3 ton / M3

URUTAN KERJA Permukaan dasar dibersihkan dan disemprot aspal cair bilamana diperlukan 2 Agregat kasar dimuat ke dalam Dump Truck menggunakan Wheel Loader (di Base Camp) 3 Agregat Kasar ditebarkan (manual) sesuai tebal yang diperlukan dan dipadatkan dengan Three Wheel Roller (6-8 Ton) minimum 6 lintasan 4 Aspal disemprotkan di atas agregat kasar yang telah diratakan menggunakan Aspal Sprayer (merata) 5 Agregat Pengunci ditebarkan dan dipadatkan dengan cara yang sama dengan pemadatan agregat kasar 1

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. 1.a. 1.b. 1.c.

BAHAN Agregat Kasar Agregat Pengunci Aspal

2. 2.a.

ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor efisiensi alat Waktu Siklus - Memuat, menuang, kembali

= {(Ak/1000 : t M3) x Fh1} : D1 = {(Ap/1000 : t M3) x Fh1} : D1 = {(As : t M3) x Fh2}

(M03) (M04) (M10)

(E15) V Fb Fa Ts1 T1 Ts1

1.4778 0.2778 99.2727

M3 M3 Kg

1.50 0.85 0.83

M3 -

0.45 0.45

menit menit

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 10.C : Penetrasi Macadam Utk.Pek.Rutin : M3

No.

U RAIAN

Kap. Prod. / jam =

URAIAN ANALISA HARG

KODE

V x Fb x Fa x 60

Q1

KOEF.

SATUAN

117.58 M3

Ts1 x Fk Koefisien Alat/M3 2.b.

= 1 : Q1

(E15)

0.0085

Jam

DUMP TRUCK (DT) Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong

(E08) V Fa v1 v2

Waktu Siklus - Mengisi Bak = (V x 60) : (Q1 x D1 X Fk) - Angkut = (L : v1) x 60 menit - Tunggu + dump + Putar - Kembali = (L : v2) x 60 menit

Ts2 T1 T2 T3 T4 Ts2

0.8268367588 50.00 0.75 37.50 89.076836759

Q2

0.91

M3

1.1039

Jam

Kap.Prod. / jam =

V x Fa x 60

3.5 ton 0.83 30.00 KM / Jam 40.00 KM / Jam

menit menit menit menit menit

Ts2 x D1 x Fk

2.c.

Koefisien Alat / M3 = 1 = 1 : Q2

(E09)

THREE WHEEL ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Faktor Efisiensi alat

(E16) v b n Fa

Kap. Prod. / jam =

(v x 1000) x b x t x Fa

3.00 Km / Jam 2.00 M 6.00 lintasan 0.83 -

Q3

45.65

M3

(E16)

0.0219

Jam

n Koefisien Alat / M3 2.d.

= 1 : Q3

ASPHALT SPRAYER Kapasitas alat Faktor efisiensi alat Kapasitas Pompa Aspal Pemakaian Aspal = As2 x Fh2 = M10 Kapasitas prod/jam = (pas x Fa x 60 x D2 x 1000) : (1000 x kas) Koefesien alat/jam = 1 : Q4

(E03) V Fa pas kas Q4

850.00 liter 0.83 55.00 liter/menit 99.2727 Kg/m3 27.87

M3

0.0359

jam

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 10.C : Penetrasi Macadam Utk.Pek.Rutin : M3

No.

2.e.

3.

U RAIAN

ALAT BANTU diperlukan setiap : - Kereta dorong - Sekop - Sapu - Sikat - Karung - Cerek Aspal - Kaleng Aspal

= = = = = = =

3 5 5 3 5 3 3

75.00 buah buah buah buah buah buah buah

: - Pekerja - Mandor

= (Tk x P) / Qt = (Tk x M) / Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

KODE

KOEF.

SATUAN

M3 pekerjaan

TENAGA Produksi menentukan (Produksi Wheel Loader) Produksi Lapen / hari = Q1 x Tk Kebutuhan tenaga : - Pekerja - Mandor Koefisien Tenaga / M3

URAIAN ANALISA HARG

2,712,927.94 / M3.

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 11.00 M3

Q1 Qt

117.58 M3/Jam 823.08 M3

P M

15.00 2.00

orang orang

(L01) (L03)

0.1276 0.0170

Jam Jam

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I. 1 2 3 4 5

6

7 II.

: 10.D : Camp. Aspal Dingin Utk.Pek.Rutin : M3

U RAIAN

KODE

ASUMSI Menggunakan buruh dan alat (semi mekanik) Lokasi pekerjaan : sepanjang jalan Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Batasan Spesifikasi : - Ukuran Agregat Nominal Maksimum - Kadar Aspal terhadap berat total campuran - Tebal nominal padat Berat Jenis Bahan : - Campuran Aspal Dingin (diambil) - Aspal (diambil) - Agregat (diambil) Faktor kembang campuran

4 III.

URUTAN KERJA Agregat dan Aspal dicampur di dalam Pengaduk Beton Mekanis (Concrete Mixer) Campuran dibawa ke lokasi pekerjaan dengan menggunakan Dump Truck Pekerja membuat/merapikan lubang patching/galian, campuran dihampar manual dengan alat bantu Hamparan dipadatkan dengan Pedestrian Roller PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. 1.a. 1.b.

BAHAN Agregat Halus Aspal Emulsi

2. 2.a.

ALAT CONCRETE MIXER Kapasitas Alat Faktor Efisiensi Alat Waktu siklus : (T1 + T2 + T3 + T4) - Memuat - Mengaduk - Menuang - Tunggu, dll.

1 2 3

Kap. Prod. / jam =

URAIAN ANALISA HARG

= {(100% - As) x 1M3 x D1} : D3 = {As x 1M3 x D1} x 1000

SATUAN

L Tk

25.0 7.00

KM jam

Sa As t

19.00 4.50 0.04

MM % M

D1 D2 D3 Fk

2.01 1.00 1.60 1.20

Ton/M3 Ton/M3 Ton/M3

(M04) (M31)

(E06) V Fa Ts1 T1 T2 T3 T4 Ts1

V x Fa x 60

KOEF.

Q1

1.1997 90.4500

M3 Kg

500.00 0.83

liter -

4.00 3.00 2.00 1.00 10.00

menit menit menit menit menit

2.49

M3

0.4016

jam

1000 x Ts1 Koefisien Alat / M3

= 1 : Q1

(E06)

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 10.D : Camp. Aspal Dingin Utk.Pek.Rutin : M3

No.

2.b.

U RAIAN

KODE

PEDESTRIAN ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Faktor Efisiensi alat Kap. Prod. / jam =

URAIAN ANALISA HARG

(v x 1000) x b x t x Fa

KOEF.

SATUAN

v b n Fa

2.50 0.65 12.00 0.83

KM/jam M lintasan -

Q2

4.50

M3

0.2224

jam

n Koefisien Alat / M3 2.c.

= 1 : Q2

DUMP TRUCK (DT) Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Kapasitas molen Waktu menyiapkan 1 molen campuran Waktu Siklus - Mengisi Bak = (V : Q1b) x Tb - Angkut = (L : v1) x 60 menit - Tunggu + dump + Putar - Kembali = (L : v2) x 60 menit

Kap.Prod. / jam =

V x Fa x 60

(E09) V Fa v1 v2 Q1b Tb Ts2 T1 T2 T3 T4 Ts2 Q3

6 M3 0.83 40.00 KM / Jam 50.00 KM / Jam 0.42 M3 10.00 menit 144.58 37.50 10.00 30 222.08

menit menit menit menit menit

0.67

M3

1.4939

Jam

D1 x Ts2 Koefisien Alat / M3

2.d.

3.

ALAT BANTU Diperlukan : - Sekop - Sapu - Alat Perata - Gerobak Dorong

= 1 : Q3

= = = =

3 4 3 2

(E09)

buah buah buah buah

TENAGA Produksi menentukan (Produksi Concrete Mixer) Produksi Campuran dalam 1 hari = Tk x Q1 Kebutuhan tenaga : - Mandor - Pekerja

Koefisien Tenaga / M3 : - Mandor - Pekerja

= (Tk x M) : Qt = (Tk x P) : Qt

Q1 Qt M P

(L03) (L01)

2.49 M3/Jam 17.43 M3 1.00 orang 12.00 orang

0.4016 4.8193

jam jam

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 10.D : Camp. Aspal Dingin Utk.Pek.Rutin : 10.D

U RAIAN

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

3,079,452.72 / M3

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 16.00 M3

URAIAN ANALISA HARG

KODE

KOEF.

SATUAN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 10.E : Aspal Pengisian Retak : LITER

No.

I. 1 2 3 4 5 6

7

8

II. 1 2 3 4

U RAIAN

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Jarak rata-rata Base Camp ke lokasi pekerjaan Jam kerja efektif per-hari Faktor kehilangan bahan Komposisi campuran : - Aspal AC - 10 atau AC - 20 - Minyak Fluk / Pencair Berat jenis bahan : - Aspal AC - 10 atau AC - 20 - Minyak Fluk / Pencair Bahan dasar (aspal & minyak pencair) semuanya diterima dilokasi pekerjaan

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN Untuk mendapatkan 1 liter Lapis resap Pengikat diperlukan : (1 liter x Fh) Aspal Kerosene

2.b.

KODE

KOEF.

SATUAN

L Tk Fh

25.0 7.00 1.10

KM Jam -

As K

87.00 13.00

% %

D1 D2

1.03 0.80

Kg / Ltr Kg / Ltr

Pc

1.10

liter

(M10) (M11)

0.99 0.14

Kg liter

(E03) V Fa Ts

850.00 0.83 2.00

liter Jam

Q1

352.75

liter

(E03)

0.0028

Jam

(E05) V Ap

400.00 M2 / Jam 0.80 liter / M2

URUTAN KERJA Aspal dan minyak tanah dicampur dan dipanaskan sehingga menjadi campuran aspal cair Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dengan Air Compresor Campuran aspal cair disemprotkan dengan Asphalt Sprayer ke atas permukaan yang akan dilapis Angkutan Aspal dan Minyak tanah menggunakan Dump Truck

III.

2. 2.a.

URAIAN ANALISA HARG

= As x Pc x D1 : 100 = K x Pc : 100

ALAT APHALT SPRAYER Kapasitas alat Faktor Efisiensi Alat Waktu Siklus (termasuk proses pemanasan) Kap.Prod. / jam =

V x Fa

Koefisien Alat / Ltr

Ts = 1 : Q1

AIR COMPRESOR Kapasitas Alat ------>> diambil Aplikasi Lapis Resap Pengikat rata-rata (Spesifikasi) Kap. Prod. / jam = Koefisien Alat / Ltr

(V x Ap) = 1 : Q2

Q2

320.00

liter

(E05)

0.0031

Jam

Berlanjut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

2.c.

3.

: 10.E : Aspal Pengisian Retak : LITER

U RAIAN

URAIAN ANALISA HARG

KODE

KOEF.

SATUAN

DUMP TRUCK (DT) Sebagai alat pengangkut bahan dilokasi pekerjaan Dump Truck melayani alat Asphalt Sprayer. Kap.Prod. / jam = sama dengan Asphalt Sprayer

(E08)

Q3

352.75

liter

Koefisien Alat / Ltr

(E08)

0.0028

Jam

Q1 Qt

352.75 2,469.25

liter liter

P M

10.00 1.00

orang orang

(L01) (L03)

0.0283 0.0028

Jam Jam

= 1 : Q3

TENAGA Produksi menentukan : ASPHALT SPRAYER Produksi / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien Tenaga / Ltr

: - Pekerja - Mandor

= (Tk x P) / Qt = (Tk x M) / Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

18,240.79 / Liter

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1,500.00 Liter

MATA PEMBAYARAN URAIAN SATUAN PEMBAYARAN

No.

I. 1 2 3 4 5 II.

:--: PEMELIHARAAN RUTIN UNTUK PEMOTONGAN RUMPUT : M2

URAIAN

ASUMSI Menggunakan buruh dan menggunakan alat manual Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jam kerja efektif per-hari Pemotongan rumput / tahun

7.00 4.00

SATUAN

jam -

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN Tidak ada bahan yang diperlukan

2.

ALAT ALAT BANTU Diperlukan : - Gunting Rumput - Sapu - Keranjang

= 1 buah = 1 buah = 1 buah

TENAGA Produksi pemotongan / orang Kebutuhan tenaga : - Mandor - Pekerja Koefisien Tenaga / M2 : - Mandor - Pekerja

Qt M P

= (Tk x M x Y) : Qt = (Tk x P x Y) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

6.

Tk Y

KOEF.

URUTAN KERJA 1 Rumput yang akan di potong berada di sisi luar jalan 2 Pemotongan/ pembersihan rumput/ tanaman dilakukan oleh tenaga manusia dengan menggunakan alat bantu

III.

3.

KODE

23,280.00 / M2

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

(L03) (L01)

400.00 M2/orang 1.00 orang 4.00 orang

0.0700 0.2800

jam jam

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M2

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 10.1 (1) b : Pembersihan Rumija

SATUAN PEMBAYARAN

: M2

No.

I. 1

2 3 4

2.c.

3.

URAIAN

URAIAN ANALISA HA

KODE

ASUMSI Memotong rumput/tanaman dengan ket8inggian pemotongan max 10 cm dari permukaan tanah Rumput/tanamam dipotong dibuang keluar lokasi yang dibersihkan dan tidak boleh dibakar Dilaksanakan sebanyak 3 kali selama periode pelaksanaan Jam kerja efektif per hari

KOEF.

SATUAN

Tk

7

jam

TENAGA Volume pemotongan rumput dalam 1 hari

Qt

600.00

M2

Kebutuhan tenaga :

- Mandor

M

0.10

orang

- Pekerja

P

1.00

orang

PERALATAN ALAT BANTU Diperlukan : - Parang

= 2 buah

Koefisien Tenaga / M3 : - Mandor

= (Tk x M) : Qt

(L03)

0.0003

jam

- Pekerja

= (Tk x P) : Qt

(L01)

0.0117

jam

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

172,697.61 / M3

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I.

: 10.1 (4) b. : Perawatan Patok Hektometer : Bh.

URAIAN

KODE

ASUMSI 1 Volume patok per-buah 2 Volume galian tanah per-buah patok Volume perbaikan patok per-buah 3 Bahan dasar (batu, pasir dan semen) diterima di lokasi 4 Jarak rata-rata Base camp ke lokasi pekerjaan 5 Jam kerja efektif per-hari 6 Kadar Semen (Spesifikasi) : - Minimum : - Maksimum 7 Perbandingan Air/Semen Maksimum (Spesifikasi) 1 : Semen 8 Perbandingan Camp. 2 : Pasir 3.5 : Agregat Kasar 9 Berat Jenis Material : - Beton - Semen - Pasir - Agregat Kasar

II.

URUTAN KERJA 1 Bagian patok yang rusak/patah/terkupas betonnya harus diperbaiki dan dibentuk seperti semula. 2 Bagian yang telah diperbaiki atau pada bagian yang telah pudar catnya, harus dicat kembali. 3 Menggunakan tenaga manusia (manual)

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. 1.a. 1.b. 1.c. 1.d.

BAHAN Semen (PC) Pasir Beton Agregat Kasar Cat

2. 2.a.

ALAT ALAT BANTU Diperlukan : - Sekop - Pacul - Sendok Semen - Ember Cor

3.

= = =

{Sm x D1 x 1000} x Vp {(Ps x D1) : D3} x Vp {(Kr x D1) : D4} x Vp

= = = =

1 1 1 1

URAIAN ANALISA HA

KOEF.

SATUAN

Vg Vt Vp

0.028 0.050 0.006

L Tk Ks1 Ks2 Wcr Sm Ps Kr

15.0 7.0 340 400 0.50 15.4 30.8 53.8

KM jam Kg/M3 Kg/M3 % % %

D1 D2 D3 D4

2.40 1.44 1.67 1.80

T/M3 T/M3 T/M3 T/M3

6.9231 0.4146 0.6731 0.2500

Zak M3 M3 Kg

(M12) (M01) (M03) (M42)

M3 M3 M3

buah buah buah buah

TENAGA Volume perawatan patok dalam 1 hari

Qt

60.00

buah

Kebutuhan tenaga :

- Mandor

M

0.05

orang

- Pekerja

P

4.00

orang

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 10.1 (4) b. : Perawatan Patok Hektometer : Bh.

URAIAN

URAIAN ANALISA HAR

KODE

KOEF.

SATUAN

Koefisien Tenaga / M3 : - Mandor

= (Tk x M) : Qt

(L03)

0.0058

jam

- Pekerja

= (Tk x P) : Qt

(L01)

0.4667

jam

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

1,101,204.72 / M3

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M3

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I.

: 10.1 (4) c. : Perawatan Patok Pengarah : Bh.

URAIAN

KODE

ASUMSI 1 Volume patok per-buah 2 Volume galian tanah per-buah patok Volume perbaikan patok per-buah 3 Bahan dasar (batu, pasir dan semen) diterima di lokasi 4 Jarak rata-rata Base camp ke lokasi pekerjaan 5 Jam kerja efektif per-hari 6 Kadar Semen (Spesifikasi) : - Minimum : - Maksimum 7 Perbandingan Air/Semen Maksimum (Spesifikasi) 0.75 : Semen 8 Perbandingan Camp. 2 : Pasir 3 : Agregat Kasar 9 Berat Jenis Material : - Beton - Semen - Pasir - Agregat Kasar

II.

URUTAN KERJA 1 Bagian patok yang rusak/patah/terkupas betonnya harus diperbaiki dan dibentuk seperti semula. 2 Bagian yang telah diperbaiki atau pada bagian yang telah pudar catnya, harus dicat kembali. 3 Menggunakan tenaga manusia (manual)

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. 1.a. 1.b. 1.c. 1.d. 1.e.

BAHAN Semen (PC) = Pasir Beton = Agregat Kasar = Cat Pemantul Cahaya

2. 2.a.

ALAT ALAT BANTU Diperlukan : - Sekop - Pacul - Sendok Semen - Ember Cor

3.

URAIAN ANALISA HA

{Sm x D1 x 1000} x Vp {(Ps x D1) : D3} x Vp {(Kr x D1) : D4} x Vp

= = = =

1 1 1 1

KOEF.

SATUAN

Vg Vt Vp

0.03 0.05 0.01

M3 M3 M3

L Tk Ks1 Ks2 Wcr Sm Ps Kr

15.0 7.0 340 400 0.50 13.0 34.8 52.2

KM jam Kg/M3 Kg/M3 % % %

D1 D2 D3 D4

2.40 1.44 1.67 1.80

T/M3 T/M3 T/M3 T/M3

0.0000 0.0000 0.0000 0.2500 1.0000

Zak M3 M3 Kg Bh

(M12) (M01) (M03) (M42) (M43)

buah buah buah buah

TENAGA Volume perawatan patok dalam 1 hari

Qt

90.00

buah

Kebutuhan tenaga :

M

0.05

orang

- Mandor

- Pekerja

ITEM PEMBAYARAN NO.

P

: 10.1 (4) c.

4.00

orang

JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: Perawatan Patok Pengarah : Bh.

URAIAN

URAIAN ANALISA HAR

KODE

KOEF.

SATUAN

Koefisien Tenaga / M3 : - Mandor

= (Tk x M) : Qt

(L03)

0.0039

jam

- Pekerja

= (Tk x P) : Qt

(L01)

0.3111

jam

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

208,737.78 / M3

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M3

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I.

: 10.1 (4) d. : Perawatan Rambu lalu lintas : BH

URAIAN

KODE

ASUMSI 1 Menggunakan cara manual 2 Lokasi pekerjaan : sepanjang jalan 3 Pekerjaan meliputi Pembetulan posisi rambu, pengencangan baut dan pengecatan. 4 Jarak rata-rata Base camp ke lokasi pekerjaan 5 Jam kerja efektif per-hari

II.

URUTAN KERJA 1 Bagian yang rusak atau bengkok, harus diluruskan kembali seperti bentuk semula. 2 Bagian yang telah diperbaiki atau pada bagian yang telah pudar catnya, harus dicat kembali.

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. 1.a.

BAHAN Cat

2. 2.a.

ALAT ALAT BANTU - Tang, Obeng, dll - Kwas, dll

3.

L Tk

(M42)

URAIAN ANALISA HA

KOEF.

SATUAN

15.0 7.00

KM jam

0.2500

Kg.

= 2 set = 2 buah

TENAGA Produksi perawatan rambu dalam 1 hari Kebutuhan tenaga : - Mandor - Pekerja Koefisien Tenaga / M3 : - Mandor - Pekerja

Qt M P

= (Tk x M) : Qt = (Tk x P) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

189,563.13 / Buah

(L03) (L01)

50.00 0.10 2.00

0.0140 0.2800

Buah orang orang

jam jam

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 10.1 (4) e. : Perawatan Marka Jalan : M2

URAIAN

URAIAN ANALISA HA

KODE

ASUMSI 1 Pekerjaan dilakukan secara manual 2 Volume perawatan per-M2 marka jalan 3 Bahan dasar diterima seluruhnya di lokasi pekerjaan 4 Jarak rata-rata Base camp ke lokasi pekerjaan 5 Jam kerja efektif per-hari 6 Faktor Kehilangan Material 7 Tebal lapisan cat secara manual 8 Berat Jenis Bahan Cat 9 Perbandingan pemakaian bahan : - Cat - Thinner II. URUTAN KERJA 1 Permukaan jalan dibersihkan dari debu/kotoran. 2 Pengecatan dilakukan dengan menggunakan alat bantu. 3 Jumlah cat cair = (1 M x 1 M) x t x 1000

KOEF.

SATUAN

I.

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. 1.a.

BAHAN Cat Marka Jalan

2.

ALAT

2.a.

ALAT BANTU Diperlukan : - Sapu Lidi - Sikat Ijuk - Alat semprot

3.

= C x R x (BJ.Cat) x Vp x Fh

15.00

%

L Tk Fh t BJ.Cat C T

15.0 7.00 1.05 0.00 0.85 60 40

KM jam M Kg/Liter % %

R

2.50

Ltr/M2

(M17)

0.2008

Kg

Qt M P

100.00 0.15 3.00

M2 orang orang

= 1 buah = 1 buah = 1 buah

TENAGA Produksi pekerjaan per hari dibutuhkan tenaga : - Mandor - Pekerja

Koefisien Tenaga / Kg : - Mandor - Pekerja

Vp

= ( M x Tk ) : Qt = ( P x Tk ) : Qt

(L03) (L01)

0.0105 0.2100

jam jam

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 10.1 (4) e. : Perawatan Marka Jalan : M2

URAIAN

URAIAN ANALISA HAR

KODE

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

71,609.62 / M2

6.

MASA PELAKSANAAN YANG DIPERLUKAN . . . . . . . . . . . bulan Masa Pelaksanaan :

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M2

KOEF.

SATUAN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 10.1 (3) a. : Pemeliharan Selokan Samping Diperkeras

SATUAN PEMBAYARAN

: M

No.

I.

II.

U RAIAN

ASUMSI 1 Panjang selokan per-1 M3 pasangan batu 2 Pembersihan/galian tanah per-M' selokan 3 - Volume perawatan pas. batu per-100 M' selokan - Volume perawatan plesteran per-100 M' selokan 4 Jarak rata-rata Base camp ke lokasi pekerjaan 5 Jam kerja efektif per-hari 6 Perbandingan Pasir & Semen : - Volume Semen : - Volume Pasir 7 Perbandingan Batu & Mortar : - Batu - Mortar (campuran semen & pasir) 8 Berat Jenis Bahan : - Pasangan Batu Dengan Mortar - Batu - Adukan (mortar) - Pasir - Semen Portland 9 Faktor kehilangan bahan : - Batu - Pasir / Semen

URAIAN ANALISA HARG

KODE

KOEF.

SATUAN

Ls Gt Pb Pl L Tk Sm Ps

2.27 0.20 0.40 4.00 25.000 7.00 25 75

Bt Mr

60 40

D1 D2 D3 D4 D5 Fh1 Fh2

2.40 1.60 1.80 1.67 1.44 1.20 1.05

M' M3 M3 M2 KM jam % % % % ton/M3 ton/M3 ton/M3 ton/M3 ton/M3 -

URUTAN KERJA 1 Tanah/material yang menutupi/menimbun selokan harus dibuang & dibersihkan 2 Bagian yang rusak pada pasangan atau beton plesteran harus dibuat kembali seperti kondisi semula. 3 Menggunakan buruh (cara manual)

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. 1.a. 1.b.

BAHAN Batu = Pb : 100 x {(Bt x D1 x 1 M3) : D2} x Fh1 : Ls Semen = Pb : 100 x Sm x {(Mr x D1 x 1 M3} : D3} x Fh2 x {D5 x (1000 : 40)} : Ls + Plesteran Pasir = Pb : 100 x Ps x{(Mr x D1 x 1M3):D4}xFh2 : Ls + Plesteran ALAT DUMP TRUCK ( 10 Ton ) Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu Siklus - Waktu tempuh isi = (L : v1) x 60 menit - Waktu tempuh kosong = (L : v2) x 60 menit - Lain-lain

1.c. 1.d. 2. 2.a.

(M02)

0.0019

M3

(M12)

0.0100

zak

(M01)

0.0010

M3

(E09) V Fa v1 v2 Ts2 T1 T2 T3 Ts2

5.00 M3 0.83 20.00 KM / Jam 30.00 KM / Jam 75.00 50.00 5.00 130.00

menit menit menit menit

Kap. Prod./jam = Koefisien Alat / M3

V x Fa x 60 Fk x Ts2 = 1 : Q2

Q2 (E08)

1.60

M3

0.6265

Jam

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

2.b.

: 10.1 (3) a. : Pemeliharan Selokan Samping Diperkeras : M

U RAIAN

KODE

KOEF.

SATUAN

ALAT BANTU Diperlukan : - Pacul - Sendok Semen - Ember Cor - Gerobak Dorong

3.

URAIAN ANALISA HA

= = = =

2 2 1 1

buah buah buah buah

TENAGA Panjang perawatan selokan dalam 1 hari Kebutuhan tenaga :

- Mandor - Pekerja

Qt

1.60

M'

M P

0.30 6.00

orang orang

Koefisien Tenaga / M3 : - Mandor

= (Tk x M) : Qt

(L03)

1.3157

jam

- Pekerja

= (Tk x P) : Qt

(L01)

26.3133

jam

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

987,927.31 / M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : M3

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I.

II.

: 10.1 (3)a : Pembersihan Selokan Samping Diperkeras : M' URAIAN ANALISA HARG

U RAIAN

KODE

ASUMSI 1 Panjang selokan per-1 M' = 0.28 M3 2 Pembersihan/galian tanah per-M3 selokan 3 Jam kerja efektif per-hari

URUTAN KERJA 1 Tanah/material yang menutupi/menimbun selokan harus dibuang & dibersihkan 2 Tanah di keluarkan menggunakan cangkul / sekop dan ditumpuk di samping saluran 3 Tanah yang sudah dikeluarkan di muat kedalam dump truck dan dibuang ke luar lokasi sejauh 4 Pekerjaan menggunakan buruh secara manual

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN

2. 2.a.

ALAT DUMP TRUCK Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu Siklus - Waktu tempuh isi = (L2 : v1) x 60 menit - Waktu tempuh kosong = (L2 : v2) x 60 menit - Lain-lain

Kap. Prod./jam =

Koefisien Alat / M3

2.b.

V x Fa x 60 x 3.57 Ts2 = 1 : Q2

ALAT BANTU Diperlukan : - Cangkul - Sekop - Gerobak Dorong

= 1 buah = 1 buah = 1 buah

KOEF.

SATUAN

M' Gt Tk

1.00 3.57 7.00

M' M' jam

L

1.50

KM

(E08) V Fa v1 v2 Ts2 T1 T2 T3 Ts2

6.00 M3 0.83 25.00 KM / Jam 30.00 KM / Jam 3.60 3.00 8.00 14.60

menit menit menit menit

Q1

73.06

M'

(E08)

0.0137

Jam

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

3.

: 10.1 (3)a : Pembersihan Selokan Samping Diperkeras : M'

U RAIAN

KODE

TENAGA Produksi menentukan : DUMP TRUCK Produksi Agregat / hari = Tk x Q1 Kebutuhan tenaga :

- Mandor - Pekerja

KOEF.

Q2 Qt

73.06 511.44

M P

0.40 4.00

SATUAN

M'/Jam M' orang orang

Koefisien Tenaga / M3 : - Mandor

= (Tk x M) : Qt

(L03)

0.0055

jam

- Pekerja

= (Tk x P) : Qt

(L01)

0.0547

jam

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

178,038.45 / M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : 5 bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M3

1

URAIAN ANALISA HA

JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I.

II.

: Pembersihan Selokan Samping Tidak Diperkeras : M' URAIAN ANALISA HARG

U RAIAN

ASUMSI 1 Panjang selokan per-1 M' = 0.28 M3 2 Pembersihan/galian tanah per-M3 selokan 3 Jam kerja efektif per-hari

URUTAN KERJA 1 Tanah/material yang menutupi/menimbun selokan harus dibuang & dibersihkan 2 Tanah di keluarkan menggunakan cangkul / sekop dan ditumpuk di samping saluran 3 Tanah yang sudah dikeluarkan di muat kedalam dump truck dan dibuang ke luar lokasi sejauh 4 Pekerjaan menggunakan buruh secara manual

KODE

KOEF.

SATUAN

M' Gt Tk

1.00 3.57 7.00

M' M' jam

L

1.50

KM

Analisa EI-10A

URAIAN ANALISA HARGA SATUAN

KETERANGAN

padat

Berlanjut ke halaman berikut

Analisa EI-10A

URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Lump Sum

Berlanjut ke halaman berikut

Analisa EI-10A

URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Analisa EI-10B

URAIAN ANALISA HARGA SATUAN

KETERANGAN

Gradasi harus memenuhi Spesifikasi

Berlanjut ke halaman berikut

Analisa EI-10B

URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Berlanjut ke halaman berikut

Analisa EI-10B

URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Lump Sum

Analisa EI-10C

URAIAN ANALISA HARGA SATUAN

KETERANGAN

Tabel 6.6.4. Tabel 6.6.4. Tabel 6.6.4. (As1 : t)

Lihat panduan

Berlanjut ke halaman berikut

Analisa EI-10C

URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Berlanjut ke halaman berikut

Analisa EI-10C

URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Lump Sum

Analisa EI-10D

URAIAN ANALISA HARGA SATUAN

KETERANGAN

Spec. 6.5.2 (2) Tabel 6.5.3 (1) Tabel 6.5.3 (1)

Berlanjut ke halaman berikut

Analisa EI-10D

URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Melayani 1 buah molen

Berlanjut ke halaman berikut

Analisa EI-10D

URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

Analisa EI-10E

URAIAN ANALISA HARGA SATUAN

KETERANGAN

100 bagian 15 bagian

campuran

Berlanjut ke halaman berikut

Analisa EI-10E

URAIAN ANALISA HARGA SATUAN Lanjutan

KETERANGAN

ELIHARAAN RUTIN UNTUK PEMOTONGAN RUMPUT

KETERANGAN

URAIAN ANALISA HARGA SATUAN

KETERANGAN

Analisa 1014b URAIAN ANALISA HARGA SATUAN

KETERANGAN

± 20 %

Tabel 7.1.3.(1) Tabel 7.1.3.(1) Tabel 7.1.3.(1)

Bersambung

Analisa 1014b URAIAN ANALISA HARGA SATUAN Lanjutan KETERANGAN

_x001E_4_ Analisa 1014c URAIAN ANALISA HARGA SATUAN

KETERANGAN

± 20 %

Tabel 7.1.3.(1) Tabel 7.1.3.(1) Tabel 7.1.3.(1)

Bersambung _x001E_4_ Analisa 1014c

URAIAN ANALISA HARGA SATUAN Lanjutan KETERANGAN

_x001E_4_ Analisa 1014d URAIAN ANALISA HARGA SATUAN

KETERANGAN

URAIAN ANALISA HARGA SATUAN

KETERANGAN

Bersambung

URAIAN ANALISA HARGA SATUAN Lanjutan KETERANGAN

URAIAN ANALISA HARGA SATUAN

KETERANGAN

A sal. ~ 0.44 M3

Spec. 7.3.2.(2) b Spec. 7.3.2.(2) b

Bersambung

URAIAN ANALISA HARGA SATUAN Lanjutan KETERANGAN

Lump sump

URAIAN ANALISA HARGA SATUAN

KETERANGAN

Lump sump

Bersambung

URAIAN ANALISA HARGA SATUAN Lanjutan KETERANGAN

URAIAN ANALISA HARGA SATUAN

KETERANGAN

Analisa EI-10A FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA MATA PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 10.A : Pondasi Agregat Kls. B Untuk : M3 Pek. Rutin

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

SATUAN

jam jam

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.1416 0.0094

14,416.67 17,273.81

JUMLAH HARGA TENAGA B.

BAHAN

1.

Agregat B

(M27)

M3

1.0000

PERALATAN

1. 2. 3. 4. 5.

Wheel Loader (E15) Dump Truck (E08) Pedestrian Roller (E24) Water Tanker (E23) Alat Bantu

jam jam jam jam Ls

0.0094 1.9314 0.0527 0.0141 1.0000

420,682.37

JUMLAH HARGA (Rp.)

2,041.21 163.05

420,682.37

420,682.37

580,851.49 336,727.28 102,964.36 292,665.30 100.00

JUMLAH HARGA PERALATAN D. E. F.

120.00 150,195,588.39 8.28

2,204.26

JUMLAH HARGA BAHAN C.

: : :

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15 % x D HARGA SATUAN PEKERJAAN ( D + E )

5,482.73 650,367.59 5,423.10 4,113.77 100.00

665,487.20 1088373.82893995 163256.074340993 1251629.90328095

Analisa EI-10B FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 10.B : Camp. Aspal Panas Utk.Pek.Rutin : M3

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

SATUAN

Jam Jam

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

21.8881 4.3776

14,416.67 17,273.81

JUMLAH HARGA TENAGA

B.

BAHAN

1. 2. 3 4

Agr 5-10 & 10-15 Agr 0-5 Semen Aspal

(M92) (M91) (M05) (M10)

M3 M3 M3 Kg

0.0307 350248.708600641 0.0298 246608.746031516 1.8514 1500 5.1615 12000

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asp. Finisher Pedestrian Roller P. Tyre Roller Alat Bantu

(E15) (E01) (E12) (E08) (E02) (E24) (E18)

Jam Jam Jam Jam Jam Jam Jam Ls

0.0218 0.0466 0.0466 2.1888 0.0000 0.1975 0.0000 1.0000

580,851.49 8,226,694.89 499,226.70 336,727.28 946,744.10 102,964.36 473,449.56 150.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15 % x D HARGA SATUAN PEKERJAAN ( D + E )

: : :

16.00 30,139,275.55 1.66

JUMLAH HARGA (Rp.)

315,553.37 75,618.16

391,171.53

10,743.18 7,346.62 2,777.04 61,938.43

82,805.27

12,665.12 383,251.65 23,257.15 737,031.88 0.00 20,336.63 0.00 150.00 1,164,027.30 1,638,004.11 245700.615860471 1883704.72159695

Analisa EI-10C FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 10.C : Penetrasi Macadam Utk.Pek.Rutin : M3

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

SATUAN

Jam Jam

PERKIRAAN VOL. PEK. TOTAL HARGA 0 % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.1276 0.0170

14,416.67 17,273.81

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3

Agregat Kasar Agregat Halus Aspal

(M03) (M04) (M10)

M3 M3 Kg

1.4778 0.2778 99.2727

PERALATAN

1. 2. 3. 4. 5.

Wheel Loader Dump Truck 3-Wheel Roller Asp. Sprayer Alat bantu

(E15) (E08) (E16) (E03)

Jam Jam Jam Jam Ls

0.0085 1.1039 0.0219 0.0359 1.0000

475,497.42 475,497.42 12,000.00

JUMLAH HARGA (Rp.)

1,839.12 293.81

702,679.52 132,082.62 1,191,272.73

2,026,034.86

580,851.49 287,873.37 244,798.82 78,595.32

JUMLAH HARGA PERALATAN D. E. F.

11.00 29,842,207.38 1.65

2,132.94

JUMLAH HARGA BAHAN C.

: : :

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15 % x D HARGA SATUAN PEKERJAAN ( D + E )

4,939.91 317,777.14 5,362.52 2,820.42 0.00

330,899.98 2,359,067.78 353860.166601274 2712927.9439431

Analisa EI-10D FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 10.D : Camp. Aspal Dingin Utk.Pek.Rutin : M3

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

SATUAN

jam jam

PERKIRAAN VOL. PEK. TOTAL HARGA % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

4.8193 0.4016

14,416.67 17,273.81

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Agregat Halus Aspal Emulsi

(M04) (M31)

M3 Kg

1.1997 90.4500

PERALATAN

1. 2. 3. 4.

Conc. Mixer (E06) Pedestrian Roller (E24) Dump Truck (E09) Alat Bantu

jam jam jam Ls

0.4016 0.2224 1.4939 1.0000

475,497.42 11,642.00

JUMLAH HARGA (Rp.)

69,477.91 6,937.27

570,463.17 1,053,018.90

1,623,482.07

187,662.98 102,964.36 588,371.85 650.00

JUMLAH HARGA PERALATAN D. E. F.

16.00 49,271,243.46 2.72

76,415.18

JUMLAH HARGA BAHAN C.

: : :

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15 % x D HARGA SATUAN PEKERJAAN ( D + E )

75,366.66 22,902.18 878,968.89 650.00

977,887.72 2,677,784.97 401667.745613386 3079452.71636929

Analisa EI-10E FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 10.E : Aspal Pengisian Retak : LITER

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

(L01) (L03)

SATUAN

Jam Jam

PERKIRAAN VOL. PEK. TOTAL HARGA % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.0283 0.0028

14,416.67 17,273.81

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Aspal Kerosene

(M10) (M11)

Kg Liter

PERALATAN

1. 2. 3.

Asphalt Sprayer Compresor Dump Truck

(E03) (E05) (E08)

Jam Jam Jam

0.9857 0.1430

0.0028 0.0031 0.0028

12,000.00 12,354.00

JUMLAH HARGA (Rp.)

408.69 48.97

11,828.52 1,766.62

13,595.14

78,595.32 202,038.29 336,727.28

JUMLAH HARGA PERALATAN D. E. F.

1,500.00 27,361,189.91 1.51

457.66

JUMLAH HARGA BAHAN C.

: : :

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15 % x D HARGA SATUAN PEKERJAAN ( D + E )

222.81 631.37 954.58

1,808.75 15,861.56 2379.2339052162 18240.7932733244

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA

PROPINSI MATA PEMBAYARAN URAIAN SATUAN PEMBAYARAN

NO.

: : : : : :

: PEMELIHARAAN RUTIN UNTUK PEMOTONGAN RUMPUT : M2

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

Jam Jam

PERKIRAAN KUANTITAS

0.2800 0.0700

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

4,000.00 1,200.00

5,200.00

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

-

150,000.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 15.00 % x D HARGA SATUAN PEKERJAAN ( D + E )

150,000.00

150,000.00 155,200.00 23,280.00 178,480.00

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

A SATUAN

PROYEK PAKET NAMA KONTRAK PROVINSI ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

B.

C.

: : : : : 10.1 (1) b : Pembersihan Rumija : M2

SATUAN

jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.0117 0.0003

14,285.71 17,142.86

166.67 5.17

JUMLAH HARGA TENAGA

171.84

JUMLAH HARGA BAHAN

0.00

BAHAN

PERALATAN

Alat Bantu

Ls

1.0000

150,000.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 15.0 % x D OVERHEAD & LABA HARGA SATUAN PEKERJAAN ( D + E )

150,000.00

150,000.00 150,171.84 22,525.78 172,697.61

Analisa 1014b

A SATUAN FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK PAKET NAMA KONTRAK PROVINSI ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : 10.1 (4) b. : Perawatan Patok Hektometer : Bh.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

jam jam

PERKIRAAN KUANTITAS

0.4667 0.0058

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4. 5.

Semen Pasir Agregat Kasar Cat Bahan lainnya

(M12) (M01) (M03) (M42)

Zak M3 M3 M3 Ls

6.9231 0.4146 0.6731 0.2500 1.0000

PERALATAN

1.

Alat Bantu

Ls

1.0000

JUMLAH HARGA PERALATAN D. E. F. Note : 1 2

6,666.67 100.00

6,766.67

63,498.75 296,400.00 337,983.91 43,330.00 150,000.00

JUMLAH HARGA BAHAN C.

JUMLAH HARGA (Rp.)

439,606.73 122,874.25 227,489.17 10,832.50 150,000.00 950,802.65

0.00

0.00

0.00

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 957,569.32 OVERHEAD & LABA 15 % x D 143,635.40 HARGA SATUAN PEKERJAAN ( D + E ) 1,101,204.72 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran.

3 4

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

yang dibayar dari kontrak) dan biaya-biaya lainnya.

4_ Analisa 1014c _x001E_4_ Analisa 1014c

A SATUAN FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK PAKET NAMA KONTRAK PROVINSI ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : : : : :

10.1 (4) b. 10.1 (4) c. Perawatan Patok Pengarah Bh.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

jam jam

PERKIRAAN KUANTITAS

0.3111 0.0039

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Cat Bahan lainnya Pematul Cahaya

(M42) (M43)

M3 Ls Bh

0.0000 1.0000 1.0000

PERALATAN

1.

Alat Bantu

Ls

1.0000

JUMLAH HARGA PERALATAN D. E. F. Note : 1

4,444.44 66.67

4,511.11

43,330.00 150,000.00 27,000.00

JUMLAH HARGA BAHAN C.

JUMLAH HARGA (Rp.)

0.00 150,000.00 27,000.00

177,000.00

0.00

0.00

0.00

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 181,511.11 15.0 % x D OVERHEAD & LABA 27,226.67 HARGA SATUAN PEKERJAAN ( D + E ) 208,737.78 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan.

4_ Analisa 1014c

2 3 4

Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

4_ Analisa 1014d _x001E_4_ Analisa 1014d

A SATUAN FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK PAKET NAMA KONTRAK PROVINSI ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: :

: Perawatan Rambu lalu lintas : BH

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.2800 0.0140

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Cat Bahan lainnya

(M42)

BH Ls

0.2500 1.0000

PERALATAN

1.

Alat Bantu

Ls

42,390.00 150,000.00

1.0000

JUMLAH HARGA PERALATAN D. E. F.

4,000.00 240.00

4,240.00

JUMLAH HARGA BAHAN C.

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 15.0 % x D OVERHEAD & LABA HARGA SATUAN PEKERJAAN ( D + E )

10,597.50 150,000.00

160,597.50

0.00

0.00

0.00 164,837.50 24,725.63 189,563.13

A SATUAN FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK PAKET NAMA KONTRAK PROVINSI ITEM PEMBAYARAN NO. JENIS PEKERJAAN : Perawatan Marka Jalan SATUAN PEMBAYARAN : M2

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Mandor

SATUAN

(L01) (L03)

jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.2100 0.0105

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Cat Marka Bahan lainnya

(M17)

Kg Ls

0.2008 1.0000

PERALATAN

1.

Alat Bantu

Ls

95,060.00 35,000.00

1.0000

JUMLAH HARGA PERALATAN D. E. F.

3,000.00 180.00

3,180.00

JUMLAH HARGA BAHAN C.

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 15.0 % x D OVERHEAD & LABA HARGA SATUAN PEKERJAAN ( D + E )

19,089.24 35,000.00

54,089.24

5,000.00

5,000.00

5,000.00 62,269.24 9,340.39 71,609.62

ANALISA HARGA SATUAN PROYEK PAKET NAMA KONTRAK PROVINSI ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : :

: 10.1 (3) a. PERKIRAAN VOL. PEK. : : Pemeliharan Selokan Samping Diperker TOTAL HARGA (Rp.) : : M % THD. BIAYA KEGIATAN :

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

(L01) (L03)

SATUAN

jam jam

PERKIRAAN KUANTITAS

26.3133 1.3157

HARGA SATUAN (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

JUMLAH HARGA (Rp.)

375,903.61 22,554.22

398,457.83

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2

Dump Truck ( 10 Ton ) Alat Bantu

Jam Ls

0.6265 1.0000

JUMLAH HARGA PERALATAN D. E. F. Note : 1

495,785.15 150,000.00

310,609.39 150,000.00

460,609.39

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 859,067.23 OVERHEAD & LABA 15 % x D 128,860.08 HARGA SATUAN PEKERJAAN ( D + E ) 987,927.31 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2 3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

ANALISA HARGA SATUAN PROGRAM PAKET KEGIATAN PROVINSI ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : : :

: 10.1 (3)a PERKIRAAN VOL. PEK. : : Pembersihan Selokan Samping DiperkerTOTAL HARGA (Rp.) : : M' % THD. BIAYA KEGIATAN :

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.0547 0.0055

14,285.71 17,142.86

JUMLAH HARGA TENAGA B.

JUMLAH HARGA (Rp.)

782.11 93.85

875.96

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2

Dump Truck Alat Bantu

Jam Ls

0.0137 1.0000

287,873.37 150,000.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & LABA 15 % x D HARGA SATUAN PEKERJAAN ( D + E )

3,940.08 150,000.00

153,940.08 154,816.04 23,222.41 178,038.45

ANALISA HARGA SATUAN PROGRAM PAKET KEGIATAN PROVINSI ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

A.

: : : :

0 PERKIRAAN VOL. PEK. : : Pembersihan Selokan Samping Tidak Di TOTAL HARGA (Rp.) : : M' % THD. BIAYA KEGIATAN :

KOMPONEN

TENAGA

SATUAN

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

ITEM PEMBAYARAN URAIAN SATUAN PEMBAYARAN

:--: PEMOTONGAN RUMPUT : M2

No.

URAIAN

I. 1 2 3 4 5 II. 1 2

III.

ASUMSI Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jam kerja efektif per-hari Kapasitas kerja per hari Jarak rata rata ke lokasi kerja

Tk Q L

URUTAN KERJA Rumput yang akan di potong berada di sisi luar jalan Pemotongan/ pembersihan rumput/ tanaman dilakukan oleh tenaga manusia dengan menggunakan alat bantu PEMAKAIAN BAHAN, ALAT DAN TENAGA

1

BAHAN Tidak ada bahan yang diperlukan

2

ALAT

2.1

Grass Cutter Kapasitas potong rumput Faktor Efisiensi alat Kap. Prod. / jam = Koefisien Alat / M2

2.2

= 1 : Q1

ALAT BANTU Diperlukan : Parang Gerobak roda tiga TENAGA

(Q3 x Fa) / 7 = 1 : Q2

Q2 (E23)

Pick Up Produksi menentukan diambil prod. Grass Cutter Faktor Efisiensi alat

Koefisien Alat / M2

2.3

(E54) Q1 Fa V x Fa

Kap. Prod. / jam =

3.

KODE

(E55) Q3 Fa Q4 (E08)

Produksi menentukan diambil prod. Grass Cutter Kebutuhan tenaga : - Mandor - Pekerja Koefisien Tenaga / M2 : - Mandor - Pekerja

= (Tk x M) : Q = (Tk x P) : Q

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : M2

:--: PEMBERSIHAN SALURAN : M

No.

URAIAN

I. 1 2 3 4 5 II. 1 2

III.

ASUMSI Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jam kerja efektif per-hari Kapasitas kerja per hari Jarak rata rata ke lokasi kerja URUTAN KERJA Saluran dibersihkan dari sampah, rumput dan endapan tanah. Rumput yang ada di sisi luar saluran dibersihkan dan dahan yang menghalangi jarak pandang dipotong. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1

BAHAN

(L03) (L01)

1045.9545882587 / M2

6.

MATA PEMBAYARAN URAIAN SATUAN PEMBAYARAN

Q M P

KODE

Tk Q L

Tidak ada bahan yang diperlukan 2 2.1

ALAT Pick Up Produksi menentukan (diambil) Faktor Efisiensi alat Kap. Prod. / jam = Koefisien Alat / M2

2.3

3.

(E55) Q1 Fa (Q3 x Fa) / 7

= 1 : Q2

Q2 (E08)

ALAT BANTU Diperlukan : Parang Sekop Gerobak roda tiga TENAGA Produksi menentukan (diambil) Kebutuhan tenaga : - Mandor - Pekerja Koefisien Tenaga / M2 : - Mandor - Pekerja

Q M P

= (Tk x M) : Q = (Tk x P) : Q

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

0 / M2

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : M2

MATA PEMBAYARAN URAIAN SATUAN PEMBAYARAN

(L03) (L01)

:--: PEMBERSIHAN SAMPAH, TANAH/PASIR DARI SALURAN TERTUTUP : M3

No.

URAIAN

I.

KODE

1 2 3 4 5 6

ASUMSI Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jam kerja efektif per-hari Kapasitas kerja per hari Berat volume tanah Faktor pengembangan bahan

Tk Q D Fk

1 2 3

URUTAN KERJA Saluran dibersihkan dari sampah, tanah/pasir Sampah, tanah/pasir dibuang Jarak buangan

L

II.

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA 1

BAHAN Tidak ada bahan yang diperlukan

2

ALAT

2.1

DUMP TRUCK Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu Siklus - Waktu tempuh isi = (L2 : v1) x 60 menit - Waktu tempuh kosong = (L2 : v2) x 60 menit - Lain-lain

Kap. Prod./jam =

Koefisien Alat / M3

(E08) V Fa v1 v2 Ts2 T1 T2 T3 Ts2

V x Fa x 60 x 3.57 Ts2

Q1

= 1 : Q2

(E08)

ALAT BANTU

2.2

3.

ALAT BANTU Diperlukan : Sekop Gerobak roda tiga TENAGA Kapasitas produksi

Q

Kebutuhan tenaga : - Mandor - Pekerja Koefisien Tenaga / M2 : - Mandor - Pekerja

M P

= (Tk x M) : Q = (Tk x P) : Q

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

0 / M3

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : M3

MATA PEMBAYARAN URAIAN SATUAN PEMBAYARAN

No.

:--: PENAMBALAN LOBANG : M2

URAIAN

I. 1 2 3 4 5 6 7 8

ASUMSI Lokasi pekerjaan : sepanjang jalan Jarak rata-rata base camp ke lokasi pekerjaan Jam kerja efektif per-hari Kapasitas kerja per hari Agregat Kelas A di beli Campuran aspal panas di beli (AC WC) Berat jenis campuran Tebal hamparan padat AC WC

1 2 3 4

URUTAN KERJA Bersihkan daerah yang akan di perbaiki Potong pinggiran lobang membentuk persegi Buang material hasil pemotongan Lobang diratakan dan dipadatkan dengan alat Vibrating Rammer

II.

(L03) (L01)

KODE

L Tk Q

D t

5 6 7

III.

Perbaiki lapisan pondasi dengan LPA dan di padatkan Di atas LPA diberi lapis resap pengikat Hampar campuran aspal panas (AC WC) di atas lobang, dan dipadatkan dengan alat Baby Roller

PEMAKAIAN BAHAN, ALAT DAN TENAGA 1

BAHAN Agregat Kelas A Lapis resap pengikat AC WC

2

ALAT

2.1

DUMP TRUCK Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu Siklus - Waktu tempuh isi = (L2 : v1) x 60 menit - Waktu tempuh kosong = (L2 : v2) x 60 menit - Lain-lain

Kap. Prod./jam =

Koefisien Alat / M3

2.2

2.3

V x Fa x 60 x 3.57 Ts2

Q1

= 1 : Q2

(E08)

VIBRATING RAMMER Kapasitas pemadatan alat Faktor Efisiensi alat Kap. Prod. / Jam =

V x Fa

Koefisien Alat /m2

= 1 : Q2

(E08) V Fa v1 v2 Ts2 T1 T2 T3 Ts2

BABY ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Lajur lintasan Faktor Efisiensi alat Lebar Overlap Apabila N <= 1 Kap. Prod. / jam = (v x 1000) x b x t x Fa x D

(E48) V Fa Q2 (E48)

(E53) v b n N Fa bo -

n Apabila N > 1 Kap. Prod. / jam =

Koefisien Alat/m2

2.3

3.

(v x 1000) x (N(b-bo)+bo) x t x Fa x D n = 1 : Q6

Q3

(E53)

ALAT BANTU Diperlukan : Sekop Perata Gerobak tiga roda TENAGA Kapasitas produksi = Q / t Kebutuhan tenaga : - Mandor - Pekerja Koefisien Tenaga / M2 : - Mandor - Pekerja

Q4 M P

= (Tk x M) : Q = (Tk x P) : Q

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

0 / M2

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : M2

(L03) (L01)

FORMULIR STA PEREKAMAN ANALISA MASIN

KOEF.

7.00 1,600.00 25.00

SATUAN

jam m2 km

KETERANGAN

4 Grass Cutter

PROYEK No. PAKET KONTRAK NAMA PAKET

: : :

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: :

NO.

: PEMOTONGAN RUMPUT : M2

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

B.

BAHAN

400.00 0.83

m2 -

332.00

M2

0.00

jam

400.00 1.00

M2 -

400.00

m2

C.

PERALATAN

0.00

jam

1. 2. 3.

Grass Cutter Pick Up Alat Bantu

(L01) (L03)

(E54) (E55)

400.00 1.00 3.00

0.00 0.01

M2 orang orang

D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN OVERHEAD & PROFIT HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tena berat untuk bahan-bahan. 2 Kuantitas satuan adalah kuantitas perkiraan setiap komp dari nomor mata pembayaran. Harga Satuan yang disam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesua 3 Biaya satuan untuk peralatan sudah termasuk bahan ba 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh yang dibayar dari kontrak) dan biaya-biaya lainnya.

jam jam

FORMULIR STA PEREKAMAN ANALISA MASIN

KOEF.

7.00 250.00 25.00

SATUAN

jam M km

KETERANGAN PROYEK No. PAKET KONTRAK NAMA PAKET

: : :

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: :

NO.

: PEMBERSIHAN SALURAN : M

KOMPONEN

A.

TENAGA

1.

Pekerja

(L01)

250.00 1.00

m -

35.71

m2

0.03

jam

250.00 1.00 5.00

0.03 0.14

TERTUTUP

2.

Mandor

B.

BAHAN

C.

PERALATAN

1. 2

Pick Up Alat Bantu

(L03)

(E55)

M2 orang orang

jam jam

D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN OVERHEAD & PROFIT HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tena berat untuk bahan-bahan. 2 Kuantitas satuan adalah kuantitas perkiraan setiap komp dari nomor mata pembayaran. Harga Satuan yang disam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesua 3 Biaya satuan untuk peralatan sudah termasuk bahan ba 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STA PEREKAMAN ANALISA MASIN

KOEF.

SATUAN

7.00 6.00 1.60 1.20

jam M3 ton/m3 km

5.00

km

KETERANGAN PROYEK

:

No. PAKET KONTRAK NAMA PAKET

: :

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: :

SATUAN PEMBAYARAN

NO.

6 M3 0.83 10.00 KM / Jam 15.00 KM / Jam 30.00 20.00 20.00 70.00

menit menit menit menit

15.24

M'

0.0656

Jam

6.00

m3

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

B.

BAHAN

C.

PERALATAN

1. 2

Dump Truck Alat Bantu

D. E. F. Note: 1

: PEMBERSIHAN SAMPAH, T DARI SALURAN : M3

(L01) (L03)

(E08)

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN OVERHEAD & PROFIT HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tena berat untuk bahan-bahan.

1.00 6.00

orang orang

1.17 7.00

jam jam

2 Kuantitas satuan adalah kuantitas perkiraan setiap komp dari nomor mata pembayaran. Harga Satuan yang disam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesua 3 Biaya satuan untuk peralatan sudah termasuk bahan ba 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh yang dibayar dari kontrak) dan biaya-biaya lainnya.

FORMULIR STA PEREKAMAN ANALISA MASIN

KOEF.

SATUAN

25.00 7.00 8.40

km jam ton

2.10 0.04

ton/m3 m

KETERANGAN PROYEK

:

No. PAKET KONTRAK NAMA PAKET

: :

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: :

NO.

: PENAMBALAN LOBANG : M2

KOMPONEN

A.

TENAGA

1.

Pekerja

(L01)

0.18 0.80 0.02

m3 m2 ton

6 M3 0.83 25.00 KM / Jam 30.00 KM / Jam 60.00 50.00 50.00 160.00 6.67

-

2.

Mandor

B.

BAHAN

1 2 3

Agregat Kelas A Lapis resap pengikat AC WC

C.

PERALATAN

1. 2 3

menit menit menit menit

Dump Truck Vibrating Rammer Baby Roller 4 Alat bantu

(L03)

(E08) (E48) (E53)

M'

0.1500

Jam

25.00 0.80

m2 -

20.00

m2/jam

0.05

jam

1.00 0.50 6.00 3.00 0.80 0.10

Km / Jam M lintasan M ton

D. E. F. Note: 1

diambil

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN OVERHEAD & PROFIT HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tena berat untuk bahan-bahan. 2 Kuantitas satuan adalah kuantitas perkiraan setiap komp dari nomor mata pembayaran. Harga Satuan yang disam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesua 3 Biaya satuan untuk peralatan sudah termasuk bahan ba 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh yang dibayar dari kontrak) dan biaya-biaya lainnya.

16.80

ton/jam

0.06

jam

210.00 1.00 5.00

0.12 0.60

m2 orang orang

jam jam

FORMULIR STA PEREKAMAN ANALISA MASIN

PROYEK

:

No. PAKET KONTRAK

:

NAMA PAKET

:

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: :

NO.

: PENGECATAN : M2

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

B.

BAHAN

1 2

Cat Minyak Pelarut

C.

PERALATAN

1.

Alat bantu

D. E. F. Note: 1

(L01) (L03)

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN OVERHEAD & PROFIT HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tena berat untuk bahan-bahan. 2 Kuantitas satuan adalah kuantitas perkiraan setiap komp dari nomor mata pembayaran. Harga Satuan yang disam terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesua 3 Biaya satuan untuk peralatan sudah termasuk bahan ba 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh

yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa

FORMULIR STANDAR UNTUK AMAN ANALISA MASING-MASING HARGA SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

MOTONGAN RUMPUT

SATUAN

jam jam

jam jam Ls

PERKIRAAN KUANTITAS

0.0131 0.0044

HARGA SATUAN (Rp.)

14,285.71 17,142.86

: : :

JUMLAH HARGA (Rp.)

187.50 75.00

JUMLAH HARGA TENAGA

262.50

JUMLAH HARGA BAHAN

0.00

0.0030 0.0025 1.0000

24,789.32 208,943.64 50.00

JUMLAH HARGA PERALATAN

74.67 522.36 50.00

647.03

HAN DAN PERALATAN ( A + B + C ) 15.0 % x D

909.53 136.43 1,045.95

s jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

as perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali skalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang dah termasuk bahan bakar, bahan habis dipakai dan operator. engeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN biaya-biaya lainnya.

Analisa

FORMULIR STANDAR UNTUK AMAN ANALISA MASING-MASING HARGA SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

MBERSIHAN SALURAN

SATUAN

jam

PERKIRAAN KUANTITAS

0.1400

HARGA SATUAN (Rp.)

14,285.71

: : :

JUMLAH HARGA (Rp.)

2,000.00

jam

0.0280

17,142.86

480.00

JUMLAH HARGA TENAGA

2,480.00

JUMLAH HARGA BAHAN

0.00

jam ls

0.0280 1.0000

208,943.64 100.00

JUMLAH HARGA PERALATAN

HAN DAN PERALATAN ( A + B + C ) 15.0 % x D

5,850.42 100.00

5,950.42 8,430.42 1,264.56 9,694.99

s jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

as perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali skalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang dah termasuk bahan bakar, bahan habis dipakai dan operator. engeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN biaya-biaya lainnya.

FORMULIR STANDAR UNTUK AMAN ANALISA MASING-MASING HARGA SATUAN

Analisa

MBERSIHAN SAMPAH, TANAH/PASIR RI SALURAN

SATUAN

PERKIRAAN KUANTITAS

jam jam

7.0000 1.1667

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.)

: :

% THD. BIAYA PROYEK

:

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

100,000.00 20,000.00

JUMLAH HARGA TENAGA

120,000.00

JUMLAH HARGA BAHAN

0.00

jam ls

0.0656 1.0000

287,873.37 5,000.00

JUMLAH HARGA PERALATAN

HAN DAN PERALATAN ( A + B + C ) 15.0 % x D

s jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

18,890.82 5,000.00

23,890.82 143,890.82 21,583.62 165,474.44

as perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali skalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang dah termasuk bahan bakar, bahan habis dipakai dan operator. engeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN biaya-biaya lainnya.

Analisa

FORMULIR STANDAR UNTUK AMAN ANALISA MASING-MASING HARGA SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

NAMBALAN LOBANG

SATUAN

jam

PERKIRAAN KUANTITAS

0.5952

HARGA SATUAN (Rp.)

14,285.71

: : :

JUMLAH HARGA (Rp.)

8,503.40

jam

0.1190

17,142.86

JUMLAH HARGA TENAGA

M3 Liter ton

0.1800 0.8000 0.0229

485,646.60 16,809.00 1,881,401.39

JUMLAH HARGA BAHAN

jam jam jam ls

0.1500 0.0500 0.0595238095 1.0000

495,785.15 59,062.44 89,948.29 1,000.00

JUMLAH HARGA PERALATAN

HAN DAN PERALATAN ( A + B + C ) 15.0 % x D

s jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

as perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali skalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang dah termasuk bahan bakar, bahan habis dipakai dan operator. engeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN biaya-biaya lainnya.

2,040.82

10,544.22

87,416.39 13,447.20 43,003.46

143,867.05

74,364.33 2,953.12 5,354.06 1,000.00

83,671.52 238,082.78 35,712.42 273,795.20

FORMULIR STANDAR UNTUK AMAN ANALISA MASING-MASING HARGA SATUAN

Analisa

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

SATUAN

PERKIRAAN KUANTITAS

jam jam

1.4000 0.7000

HARGA SATUAN (Rp.)

: : :

JUMLAH HARGA (Rp.)

14,285.71 17,142.86

JUMLAH HARGA TENAGA

Kg Liter

0.3000 0.0300

42,390.00 23,100.00

JUMLAH HARGA BAHAN

ls

1.0000

1,000.00

JUMLAH HARGA PERALATAN

HAN DAN PERALATAN ( A + B + C ) 15.0 % x D

s jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

as perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali skalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang dah termasuk bahan bakar, bahan habis dipakai dan operator. engeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

20,000.00 12,000.00

32,000.00

12,717.00 693.00

13,410.00

1,000.00

1,000.00 46,410.00 6,961.50 53,371.50

biaya-biaya lainnya.

Related Documents

Jalan Raya
October 2019 62
Teknik Jalan Raya Iii.pdf
November 2019 29
Soal Jalan Raya
October 2019 31
Live Jalan Raya
November 2019 20

More Documents from ""

Jalan Raya
October 2019 62
Desain Struktur
October 2019 39
Sbbk Hampangen 2019.docx
November 2019 32
Proposal Paskah.docx
November 2019 28