LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANADO Nomor Tanggal Tentang Penetapan Standardisasi Harga Satuan Jadi di lingkungan Dinas Pekerjaan Umum Kota Manado

DAFTAR HARGA SATUAN BAHAN NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

JENIS BAHAN Agregat Base Kelas A Agregat Base Kelas B Agregat Base Kelas C Agregat Halus Agregat Kasar Agregat Pecah Mesin 0-5 mm Agregat Pecah Mesin 20-30 mm Agregat Pecah Mesin 50-70 mm Agregat Pecah Mesin 5-10 & 10-20 mm Air Alang-alang Anchorage Anti strpping agent Arbocell Asbuton Halus Asbuton yang diproses Aspal Aspal Emulsi Aspal Hotmix (Ready Mix) Assetilline Bahan Modifikasi Bahan pengawet: kreosot Bahan Pengisi (Filler) Tambahan Bahan Pilihan Bahan Tanah Timbunan Baja Bergelombang Baja Prategang Bata merah Batako Uk. 20 x 40 x 10 Batu Alam 10 x 20

SATUAN

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Halaman 1 dari 266 halaman

NO. 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

JENIS BAHAN Batu apung Batu Bara Batu Bata Klinker Uk. 5 x 5 x 25 Batu Belah / Batu Kali / Batu Gunung Batu Belah / Kerakal Batu Belah Uk. 15 - 20 Batu Boulder Batu Bunga (Alam) Batu Candi 10 x 20 Batu Candi 30 x 30 Batu Green Bally 15 x 30 Batu Green Bally 20 x 40 Batu Palimanan 10 x 20 Batu Palimanan 15 x 30 Batu Palimanan 20 x 40 Batu Palimanan 30 x 30 Batu Sukabumi 10 x 20

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Halaman 2 dari 266 halaman

NO. 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88

JENIS BAHAN Batu Sukabumi 15 x 15 Bensin / Premium (HET) Bensin / Premium (Industri) Bunker Oil Butonite Patch Cansteen Casing Cerucuk Chipping Chipping Curing Compound Ducting (Kabel prestress) Ducting (Strand prestress) Elastomer Elastomer Alam Elastomer jenis 1 Elastomer jenis 2 Elastomer jenis 3 Elastomer Sintesis Expansion Cap Expansion Join Baja Siku Expansion Join Tipe Rubber Expansion Joint Tipe Torma Expansion Tipe Joint Asphaltic Plug Filler Filler Gravel Gebalan Rumput Geotextile Hollow Brick Ijuk Joint Sealent Joint Socket Pile 16x16x16 Joint Socket Pile 35x35 Kapur Kapur Padam Kapur sirih Karet Elastomer Kerb jenis 1 Kerb jenis 2 Kerb jenis 3

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Halaman 3 dari 266 halaman

NO. 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129

JENIS BAHAN Kerb Type A Kerikil Beton Kerikil Koral Uk. 1 - 3 cm Koral Sikat 2 - 3 cm Koral Sikat Panca Warna Mikro Pile 16x16x16 Mini Timber Pile Minyak Bekisting Minyak Fluks Minyak Pelumas / Oli (Pertamina) Minyak Pelumas / Oli (Shell) Minyak Pelumas / Olie Minyak Tanah / Kerosine (Industri) Oxygen Pasir Kasar/ Urug Pasir Pasang / Beton Paving Stone S o l a r (HET) S o l a r (Industri) Semen PC Semen Putih Semen Warna Sirtu Alam Storox-100 Tanah Biasa Tanah Liat Tanah Pilihan Trihex Paving Additive Bahan Agr.Base Kelas C2 Pasir Halus (untuk HRS) Pasir Tailing Pasir Urug Pasir Urug (ada unsur lempung) Besi Hollow 2 x 4 cm Besi Hollow 4 x 4 cm Besi Profil Besi Siku 3 x 3 x 2 Besi Siku 3 x 3 x 3 Besi Siku 4 x 4 x 3 Besi Siku 4 x 4 x 4

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Halaman 4 dari 266 halaman

NO. 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170

JENIS BAHAN Besi Siku 5 x 5 x 5 Besi Stainlessteel 1 1/2" Besi Stainlessteel 1 1/4" Besi Stainlessteel 1" Besi Stainlessteel 1/2" Besi Stainlessteel 2" Besi Stainlessteel 3" Besi Stainlessteel 3/4" Besi Stainlessteel 4" Besi strip Besi Warmesh θ 10 Besi Warmesh θ 6 Besi Warmesh θ 8 Bois Beton dia. 100 cm (pakai tulangan) Bois Beton dia. 100 cm (tanpa tulangan) Bois Beton dia. 150 cm (pakai tulangan) Bois Beton dia. 150 cm (tanpa tulangan) Bois Beton dia. 60 cm (pakai tulangan) Bois Beton dia. 60 cm (tanpa tulangan) Bois Beton dia. 80 cm (pakai tulangan) Bois Beton dia. 80 cm (tanpa tulangan) Kawat baja Kawat Beronjong Kawat Beronjong (Jadi) dia. 2,7 mm ( 2 x 1 x 0,5 ) Kawat Beronjong (Jadi) dia. 2,7 mm ( 3 x 1 x 0,5 ) Kawat Beronjong (Jadi) dia. 3,0 mm ( 2 x 1 x 0,5 ) Kawat Beronjong (Jadi) dia. 3,0 mm ( 3 x 1 x 0,5 ) Kawat Beton / Bendrat Kawat Duri Kawat jaring galvanis Kawat Las Pagar BRC (BRC Fence) ; tinggi = 120 cm Pagar BRC (BRC Fence) ; tinggi = 175 cm Pagar BRC (BRC Fence) ; tinggi = 90 cm Paku Asbes bh Paku Beton Paku Genteng Metal Paku Kayu 2" s/d 6" Paku pancing Paku Reng Paku Sekrup

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Halaman 5 dari 266 halaman

NO. 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211

JENIS BAHAN Paku Seng Paku Tripleks Pintu gulung besi Plat Rambu Profil alumunium "T" Rel Pengaman (Guard Rail) Rolling Door Sekrup fixer Sekrup Galbani Strip Bearing Besi Beton Polos Besi Beton Polos dia. 10 mm Besi Beton Polos dia. 12 mm Besi Beton Polos dia. 14 mm Besi Beton Polos dia. 16 mm Besi Beton Polos dia. 6 mm Besi Beton Ulir Besi Beton Ulir dia. 14 mm Besi Beton Ulir dia. 16 mm Besi Beton Ulir dia. 18 mm Besi Beton Ulir dia. 20 mm Besi Beton Ulir dia. 22 mm Besi Beton Ulir dia. 24 mm Semen tahan Asam Tiang Pancang Baja Beton Roster Uk. 20x20 cm Beton Roster Uk. 20x40 cm Ijuk Matras Concrete Residu Roster Kaca Uk. 20x20 cm Roster Uk. 20x20 cm (keramik) Roster Uk. 40x40 cm (keramik) Tali ijuk Ampelas Cat Dasar /Alkali (Dulux/ Setara) Cat Kayu/Besi Mengkilap (Glotex/ Seiv/ Setara) Cat Marka Cat Marka (Non Thermoplas) Cat Menie Kayu/Besi/Seng (Glotex Setara) Cat Multiguard

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Halaman 6 dari 266 halaman

NO. 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252

JENIS BAHAN Cat Tembok (Dulux/ICI setara) Cat Tembok (Metrolite/ Catylac/ Setara) Cat Tembok Biasa Cat Waterproofing (Setara Aquaproof) Compound Gypsum Dempul Besi Dempul Kayu/Wood Filler (Impra Setara) Kuas Lem Eha-Bond Minyak Cat / Thiner Paper Tape Plamir Plamur Tembok (Danapaint Setara) Polimer Politur Polytene 125 mikron Sherlak Soda api Spiritus Teak oil Kaca One Way 10 mm Kaca One Way 5 mm Rangka Aluminium 3" coklat Rangka Aluminium 3" Silver Rangka Aluminium 4" coklat Rangka Aluminium 4" Silver Kayu Acuan Kayu Bakar Kayu Kelas I (Kayu Besi, dll.) Kayu Kelas I (Kayu Linggua,dll.) Kayu Kelas II (Kayu Cempaka, dll.) Kayu Kelas III (Kayu Nantu, dll.) Kayu Kelas IV (Kayu Telon, dll.) Kayu Perancah Perancah kayu Aditif anti pengelupasan Cat Anti Karat Asbes Gelombang Besar Asbes Gelombang Kecil Atap alumunium gelombang tebal 0.55 mm Atap Genteng Metal (setara Multi Roof)

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Halaman 7 dari 266 halaman

NO. 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293

JENIS BAHAN Atap Genteng Metal (setara Sakura Roof:80 cmX 80 cm) Atap Onduline Gelombang 0.95 * 1.95 M Atap Spandek Bubungan Genteng Metal (setara Multi Roof) Bubungan Genteng Metal (setara Sakura Roof) Eternit (Asbes) Flashing Genteng Metal (setara Multi Roof) Flashing Genteng Metal (setara Sakura Roof) Genteng (setara Genteng Kodok) Genteng Aspal Genteng Beton Genteng Kaca Genteng Keramik Genteng Sirap Karpus Asbes Gelombang Besar Karpus Asbes Gelombang Kecil Karpus Genteng (setara Genteng Kodok) Karpus Genteng Beton Karpus Genteng Keramik Kaso 3/5 Nok alumunium standar 40 cm 18, swg 22 Nok genteng beton Nok Samping Genteng Metal (setara Multi Roof) Nok Samping Genteng Metal (setara Sakura Roof) Policarbonate Seng Fiberglass Seng Fiberglass Laserlite Plus (uk. 180 x 86 x 0,9 cm) Seng Gelombang Alluminium 0,25 mm Seng Gelombang Alluminium 0,30 mm Seng Gelombang BJLS 20 Seng Gelombang BJLS 24 Seng Gelombang BJLS 25 Seng Gelombang BJLS 30 (uk. 180 x 90 x 0,3 cm) Seng Plat BJLS 20 Seng Plat BJLS 25 Seng Plat BJLS 30 (uk. 91,4 x 182,9 cm) Seng Plat Alluminium 0,25 mm Seng Plat Alluminium 0,30 mm Internal cove artistik (5 x5x20) cm Marmer Plint keramik arttistik uk. 10 x 10 cm

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Halaman 8 dari 266 halaman

NO. 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334

JENIS BAHAN Plint keramik arttistik uk. 10 x 20 cm Shower Screen Aluminium Tegel Abu-Abu uk. 20x20 cm Tegel Abu-Abu uk. 30x30 cm Tegel Abu-Abu uk. 40x40 cm Tegel Berwarna uk. 20x20 cm Tegel Berwarna uk. 30x30 cm Tegel Berwarna uk. 40x40 cm Tegel Esenza uk. 40x40 cm Tegel granite dinding 20 x 20 Tegel granite dinding 25 x 50 Tegel granite dinding 25 x 60 Tegel granite dinding 30 x 30 Tegel granite dinding 30 x 60 Tegel granite lantai 20 x 20 Tegel granite lantai 30 x 30 Tegel granite lantai 40 x 40 Tegel granite lantai 50 x 50 Tegel granite lantai 60 x 60 Tegel granite lantai 80 x 80 Tegel Granito uk. 30x30 cm Tegel Granito uk. 40x40 cm Tegel Keramik uk. 10x20 cm Tegel Keramik uk. 10x33 cm Tegel Keramik uk. 11x11 cm Tegel Keramik uk. 15x15 cm Tegel Keramik uk. 15x20 cm Tegel Keramik uk. 20x20 cm Tegel Keramik uk. 20x25 cm Tegel Keramik uk. 25x25 cm Tegel Keramik uk. 30x30 cm Tegel Keramik uk. 30x30 cm antislip Tegel Keramik uk. 33x33 cm Tegel Keramik uk. 33x33 cm anti slip Tegel Keramik uk. 40x40 cm anti slip Tegel mosaik 30 x 30 cm, ex lokal Tegel Plint granito uk. 10x30 cm Tegel Plint granito uk. 10x40 cm Tegel Plint granito uk. 15x30 cm Tegel Plint pc abu-abu uk. 15x30 cm Tegel Plint pc abu-abu uk. 10x30 cm

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Halaman 9 dari 266 halaman

NO. 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375

JENIS BAHAN Tegel Plint pc abu-abu uk. 10x40 cm Tegel Plint pc warna uk. 10x40 cm Tegel Plint teralux kerang uk. 10x30 cm Tegel Plint teralux kerang uk. 10x40 cm Tegel Plint teralux kerang uk. 15x30 cm Tegel Plint teralux marmer uk. 10x30 cm Tegel Plint teralux marmer uk. 10x40 cm Tegel Plint teralux marmer uk. 10x60 cm Tegel Plint Teraso uk. 10x30 cm Tegel Plint Teraso uk. 10x40 cm Tegel Plint Teraso uk. 15x30 cm Tegel Plint warna uk. 10x20 cm Tegel Porselin putih uk. 11x11 cm Tegel Porselin putih uk. 15x15 cm Tegel Porselin putih uk. 20x20 cm Tegel Porselin warna uk. 10x20 cm Tegel Porselin warna uk. 11x11 cm Tegel Porselin warna uk. 15x15 cm Tegel Porselin warna uk. 20x20 cm Tegel teralux kerang uk. 30 x 30 cm Tegel teralux kerang uk. 40 x 40 cm Tegel teralux marmer uk. 40 x 40 cm Tegel teralux marmer uk. 60 x 60 cm Tegel Teraso uk. 30x30 cm Tegel Teraso uk. 40x40 cm Tegel Wafel uk. 20x20 cm Teraso cor Ubin keramik arttistik uk. 10 x 10 cm Ubin keramik arttistik uk. 10 x 20 cm Ubin keramik arttistik uk. 15 x 15 cm Ubin keramik arttistik uk. 5 x 20 cm Ubin tahan asam Bak Cuci Stainless Steel (1 Lobang) Bak Cuci Stainless Steel (2 Lobang) Bak Mandi Fiberglass Bathub Biofill BF 8 Floor Drain Jet Pump Grundfos; Head 50 m; kap. 72 l/dt Jet Pump; Head 30 m; kap. 30 l/dt Kitchen Set

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Halaman 10 dari 266 halaman

NO. 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416

JENIS BAHAN Kloset Duduk Keramik Standar Kloset Jongkok Keramik Standar Kloset Monoblok Lokal Mata Kran Standar 1/2" Mata Kran Standar 3/4" Mata Kucing PCI Girder L=17m PCI Girder L=21m PCI Girder L=26m PCI Girder L=32m PCI Girder L=36m PCI Girder L=41m Pelat Rambu (Eng. Grade) Pelat Rambu (High I. Grade) Pemantul Cahaya (Reflector) Pipa Baja Pipa Galvanis (medium A) dia. 1" Pipa Galvanis (medium A) dia. 1/2" Pipa Galvanis (medium A) dia. 2" Pipa Galvanis (medium A) dia. 3" Pipa Galvanis (medium A) dia. 3/4" Pipa Galvanis (medium B) dia. 1" Pipa Galvanis (medium B) dia. 1/2" Pipa Galvanis (medium B) dia. 2" Pipa Galvanis (medium B) dia. 3" Pipa Galvanis (medium B) dia. 3/4" Pipa Galvanis Light (biasa) dia. 1" Pipa Galvanis Light (biasa) dia. 1/2" Pipa Galvanis Light (biasa) dia. 2" Pipa Galvanis Light (biasa) dia. 3" Pipa Galvanis Light (biasa) dia. 3/4" Pipa Polyethylene (PE) dia. 1" Pipa Polyethylene (PE) dia. 3/4" Pipa Polyteline PE dia. 1 1/2" Pipa Porous Pipa PVC dia. 1" AW Pipa PVC dia. 1,5" AW Pipa PVC dia. 2" AW Pipa PVC (S-10) dia. 1" D Pipa PVC (S-10) dia. 1,5" D Pipa PVC (S-10) dia. 2" D

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Halaman 11 dari 266 halaman

NO. 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457

JENIS BAHAN Pipa PVC (S-10) dia. 3" D Pipa PVC (S-10) dia. 3/4" D Pipa PVC (S-10) dia. 4" D Pipa PVC (S-12,5) dia. 1/2" AW Pipa PVC (S-12,5) dia. 3/4" AW Pipa PVC dia. 1 1/4" AW Pipa PVC dia. 1/2" AW Pipa PVC dia. 3" AW Pipa PVC dia. 3/4" AW Pipa PVC dia. 4" AW Pompa Air Listrik; Suction 9 m; Head 40 m; kap. 35 l/min Pompa Centrifugal; Head 100 m; kap. 11 l/dt Pompa Tangan Dragon Profil Tank Fiberglass orange kap. 1100 ltr. Profil Tank Fiberglass orange kap. 650 ltr. Shower Screen Fiber Shower Screen Kaca Stop Kran 1" Stop Kran 1/2" Stop Kran 2" Stop Kran 3/4" Submersible Deep Well Pump; Head 100 m; kap.1 HP Submersible Deep Well Pump; Head 70 m; kap.2 HP Urinoir Keramik Standar Wastafel Gantung Keramik Box MCB Down Light Warna 3" Down Light Warna 4" Down Light Warna 5" Down Light Warna 6" Exhaust Fetting Genset 1300 W Genset 2000 W Genset 2500 W Genset 5000 W Genset 6000 W Genset 900 W Kabel Ravo 2x1,5 mm2 Kabel Ravo 2x2,5 mm2 Lampu Downlight 4'

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Halaman 12 dari 266 halaman

NO. 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498

JENIS BAHAN Lampu Neon SL 15 Wat Lampu Neon SL 18 Wat Lampu Pijar 100 Wat Lampu Pijar 25 Wat Lampu Pijar 40 Wat Lampu Pijar 60 Wat Lampu TL (Neon) 10 Wat (komplet) Lampu TL (Neon) 20 Wat (komplet) Lampu TL (Neon) 40 Wat (komplet) Main Distribusi Panel (PDM) Saklar Ganda Saklar Stopkontak Saklar Tunggal Sekring Automatik Stop Kontak Alumunium foil Carpet Carpet 80% wool, 20% nylon Feltex carpet 100% wool T-21 Floor hardener Gymfloor Lem vinyil Lt vinyl karet 30x30 kwl II Lt vinyl karet 30x30 kwl l Parquet jati Underlyer tebal 6 mm/rubber corrugated Vinyil Vinyil asbes Vinyil motif kembang Ex DN Vinyil wall covering lebar 50 cm Wallpaper Jendela besi Jendela besi tahan api Kaca Buram 12 mm Kaca Buram 5 mm Kaca cermin tebal 5 mm Kaca cermin tebal 8 mm Kaca patri Kaca Polos 3 mm Kaca Polos 5 mm Kaca Polos 8 mm

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Halaman 13 dari 266 halaman

NO. 499 500

JENIS BAHAN Kaca Ray-Band 5 mm Kaca wireglass

SATUAN #REF! #REF!

Halaman 14 dari 266 halaman

NO. 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541

JENIS BAHAN Kawat burung Kawat Harmonika Kawat Nyamuk/Kasa Logam Kawat Nyamuk/Kasa Plastik Naco (Kerangka dan Daun) Pintu besi baja Pintu lipat Plastik Filter Sunscreen alumunium Door closer Door holder Door Stop Engsel (setara solid) 3" Engsel (setara solid) 4" Engsel Biasa 2 1/2" Engsel Biasa 3" Engsel Lokal Besar Engsel Nylon Arch 3" Espagnolet Formica Grendel (setara solid) Grendel Lokal Besar Hak Angin Biasa Kait angin Kosen + Pintu PVC Kunci lemari Kunci Pintu Master (setara solid) Kunci Selot Kunci Silinder Putar Kunci Tanam 2 Slag Kunci Tanam 3 Slag Kunci Tanam Biasa Pegangan pintu biasa Pintu alumunium Rol pintu dorong Sealent Tarikan Pintu (setara solid) 10" Tarikan Pintu (setara solid) 15" Tarikan Pintu (setara solid) 20" Venetion blinds Bambu / Dolken

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Halaman 15 dari 266 halaman

NO. 542 543 544 545 546 547 548 549 550 551 552 553 554

JENIS BAHAN Gypsum 12 mm Gypsum 9 mm Kayu Profil 3/3 Kayu Profil 3/8 List Profil List Profil Gypsum Lumbressering Metal Furing (Rangka Plafond) Multipleks 12 mm Multipleks 4 mm Multipleks 6 mm Multipleks 9 mm Plywood 3 mm

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Halaman 16 dari 266 halaman

NO. 555 556 557 558 559 560 561 562 563 564 565 566

JENIS BAHAN Plywood 4 mm Plywood 6 mm Softboard Teakwood 3x7 Teakwood 4x8 Tripleks 3 mm Tripleks 4 mm Tripleks 6 mm Glass Bit Lem Kayu Sabun Perlengkapan

SATUAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Catatan : - Sesuai harga yang berlaku dipasaran. - Harga satuan belum termasuk pajak yang berlaku. - Harga sewaktu-waktu bisa berubah Menyetujui, a.n. KEPALA DINAS PEKERJAAN UMUM KOTA MANADO SEKRETARIS

ROYKE F. MAMAHIT, ST., MT. NIP. 19730630 200003 1 007

PT. MEDALION ESA PERKASIN

MEITA M. M. TUMEWU, ST

Halaman 17 dari 266 halaman

HAN HARGA (Rp.)

KET

417,410.00 332,780.00 357,430.00 362,240.00 362,240.00 803,910.00 639,850.00 574,230.00 672,660.00 160.00 32,810.00 1,748,250.00 65,630.00 42,000.00 7,797,560.00 77,980.00 12,000.00 7,230.00 1,706,250.00 301,230.00 1,310.00 6,560.00 1,580.00 89,340.00 71,480.00 14,240.00 15,750.00 990.00 2,630.00 150,940.00 Halaman 18 dari 266 halaman

HARGA (Rp.) 7,880.00 790.00 1,980.00 294,000.00 248,060.00 248,060.00 262,500.00 164,060.00 183,750.00 203,440.00 242,810.00 242,810.00 190,310.00 216,560.00 223,130.00 223,130.00 170,630.00

KET

Halaman 19 dari 266 halaman

HARGA (Rp.) 150,940.00 5,910.00 12,990.00 2,990.00 31,830.00 59,060.00 32,810.00 19,690.00 1,580.00 1,580.00 50,540.00 196,880.00 65,630.00 853,130.00 59,060.00 556,560.00 938,440.00 1,209,860.00 59,060.00 7,940.00 360,940.00 1,575,000.00 1,575,000.00 1,350,300.00 1,580.00 1,580.00 353,330.00 15,750.00 8,540.00 4,600.00 16,410.00 44,760.00 88,600.00 797,350.00 52,500.00 98,440.00 1,190.00 853,130.00 59,060.00 65,630.00 72,190.00

KET

Halaman 20 dari 266 halaman

HARGA (Rp.) 59,060.00 362,240.00 362,240.00 13,130.00 9,850.00 79,740.00 35,440.00 13,790.00 2,394.00 38,730.00 59,060.00 38,730.00 13,330.00 150,610.00 231,660.00 231,660.00 5,910.00 6,500.00 10,750.00 1,580.00 3,290.00 15,750.00 168,260.00 65,630.00 71,480.00 65,630.00 89,340.00 3,940.00 50,540.00 108,150.00 254,830.00 339,940.00 231,660.00 231,660.00 63,530.00 84,280.00 22,980.00 52,500.00 75,480.00 85,310.00 121,410.00

KET

Halaman 21 dari 266 halaman

HARGA (Rp.) 195,180.00 157,500.00 150,940.00 144,380.00 101,730.00 183,650.00 157,500.00 124,690.00 315,000.00 115,500.00 1,279,690.00 465,940.00 767,810.00 367,500.00 262,500.00 459,380.00 301,880.00 262,500.00 196,880.00 328,130.00 210,000.00 39,380.00 23,630.00 496,560.00 682,500.00 551,250.00 826,880.00 26,250.00 26,250.00 52,500.00 32,810.00 787,500.00 853,130.00 656,250.00 1,110.00 32,810.00 39,380.00 22,980.00 26,250.00 22,980.00 72,190.00

KET

Halaman 22 dari 266 halaman

HARGA (Rp.) 28,880.00 29,540.00 984,380.00 265,260.00 26,250.00 170,630.00 2,296,880.00 260.00 790.00 301,230.00 13,000.00 78,750.00 105,000.00 164,060.00 210,000.00 39,380.00 14,240.00 168,660.00 206,500.00 285,550.00 421,980.00 400,150.00 524,350.00 49,700.00 16,410.00 19,690.00 52,500.00 531,560.00 42,660.00 29,540.00 49,230.00 65,630.00 32,810.00 3,940.00 65,630.00 59,060.00 143,990.00 108,030.00 52,500.00 59,060.00

KET

Halaman 23 dari 266 halaman

HARGA (Rp.) 84,000.00 26,250.00 19,690.00 65,630.00 13,130.00 65,630.00 52,500.00 15,750.00 45,940.00 26,250.00 1,310.00 25,810.00 23,510.00 59,060.00 49,230.00 25,260.00 65,630.00 13,130.00 13,130.00 37,080.00 1,312,500.00 689,060.00 190,310.00 164,060.00 255,940.00 190,310.00 1,800,000.00 262,500.00 10,000,000.00 10,000,000.00 7,000,000.00 5,000,000.00 1,800,000.00 2,100,000.00 2,100,000.00 65,630.00 48,180.00 52,500.00 34,790.00 72,190.00 90,240.00

KET

Halaman 24 dari 266 halaman

HARGA (Rp.) 72,190.00 106,310.00 85,310.00 62,350.00 44,630.00 39,380.00 39,380.00 36,100.00 45,940.00 91,880.00 39,380.00 59,060.00 39,380.00 6,560.00 45,940.00 30,190.00 22,980.00 13,130.00 36,100.00 29,540.00 65,630.00 45,940.00 44,630.00 44,630.00 144,380.00 72,190.00 98,440.00 63,000.00 73,500.00 49,880.00 65,630.00 75,480.00 85,310.00 49,230.00 68,250.00 76,790.00 55,130.00 68,250.00 6,560.00 393,750.00 3,940.00

KET

Halaman 25 dari 266 halaman

HARGA (Rp.) 4,260.00 3,281,250.00 2,630.00 6,100.00 12,360.00 2,950.00 6,560.00 10,940.00 91,880.00 39,380.00 78,750.00 131,250.00 149,630.00 65,630.00 95,160.00 106,310.00 131,250.00 196,880.00 370,790.00 39,380.00 65,630.00 1,640.00 2,890.00 1,450.00 2,360.00 2,630.00 2,950.00 3,290.00 5,210.00 5,500.00 8,540.00 11,690.00 11,430.00 17,080.00 62,350.00 39,380.00 44,630.00 42,000.00 2,300.00 1,980.00

KET

Halaman 26 dari 266 halaman

HARGA (Rp.) 2,100.00 2,360.00 40,690.00 40,690.00 43,310.00 45,940.00 47,250.00 49,230.00 7,880.00 8,540.00 5,910.00 2,950.00 1,110.00 1,850.00 4,200.00 2,100.00 1,710.00 2,240.00 3,940.00 36,750.00 55,130.00 111,560.00 196,880.00 7,230.00 13,400.00 2,160.00 1,050,000.00 4,600.00 9,190.00 10,340.00 4,600.00 85,310.00 328,130.00 590,630.00 656,250.00 3,937,500.00 12,206,250.00 26,250.00 3,937,500.00 1,968,750.00 1,968,750.00

KET

Halaman 27 dari 266 halaman

HARGA (Rp.) 1,115,630.00 229,690.00 1,246,880.00 73,750.00 123,310.00 98,440.00 169,312,500.00 190,968,750.00 244,125,000.00 309,093,750.00 330,750,000.00 378,000,000.00 207,640.00 265,390.00 16,540.00 21,660.00 45,940.00 26,250.00 88,600.00 147,660.00 36,100.00 19,690.00 11,810.00 112,040.00 72,190.00 16,410.00 19,690.00 9,850.00 31,250.00 68,910.00 13,130.00 15,750.00 11,160.00 32,810.00 42,930.00 7,880.00 13,130.00 19,690.00 8,540.00 10,830.00 12,300.00

KET

Halaman 28 dari 266 halaman

HARGA (Rp.) 22,310.00 6,090.00 32,810.00 5,410.00 6,560.00 10,500.00 5,250.00 32,810.00 5,910.00 55,130.00 590,630.00 14,437,500.00 360,940.00 1,968,750.00 1,282,980.00 3,281,250.00 4,593,750.00 98,440.00 45,940.00 203,640.00 78,750.00 6,890,630.00 5,250,000.00 1,799,440.00 725,130.00 45,940.00 46,760.00 61,530.00 75,480.00 164,060.00 459,380.00 9,850.00 2,100,000.00 2,625,000.00 3,806,250.00 7,875,000.00 8,531,250.00 1,181,250.00 9,850.00 11,160.00 78,750.00

KET

Halaman 29 dari 266 halaman

HARGA (Rp.) 39,380.00 42,660.00 10,500.00 6,560.00 7,880.00 9,850.00 59,060.00 98,440.00 114,850.00 3,610.00 26,250.00 32,810.00 19,690.00 32,810.00 19,690.00 65,630.00 85,310.00 105,000.00 216,560.00 36,100.00 157,500.00 36,100.00 111,560.00 105,000.00 236,250.00 223,130.00 36,100.00 16,410.00 22,980.00 131,250.00 150,940.00 984,380.00 1,181,250.00 393,750.00 229,690.00 210,000.00 262,500.00 393,750.00 131,250.00 203,440.00 210,000.00

KET

Halaman 30 dari 266 halaman

HARGA (Rp.) 210,000.00 196,880.00

KET

Halaman 31 dari 266 halaman

HARGA (Rp.) 22,980.00 41,010.00 24,610.00 19,690.00 525,000.00 459,380.00 984,380.00 13,130.00 164,060.00 984,380.00 328,130.00 65,630.00 26,250.00 45,940.00 9,850.00 13,130.00 32,810.00 15,980.00 196,880.00 91,880.00 29,540.00 22,980.00 6,560.00 22,980.00 459,380.00 32,810.00 295,310.00 39,380.00 98,440.00 190,310.00 262,500.00 98,440.00 65,630.00 360,940.00 105,000.00 110,250.00 150,940.00 328,130.00 525,000.00 78,750.00 16,410.00

KET

Halaman 32 dari 266 halaman

HARGA (Rp.) 131,250.00 78,750.00 14,440.00 15,750.00 6,560.00 32,810.00 22,980.00 39,380.00 238,230.00 72,190.00 105,000.00 144,380.00 101,730.00

KET

Halaman 33 dari 266 halaman

HARGA (Rp.) 111,560.00 118,130.00 78,750.00 118,130.00 131,250.00 59,060.00 75,480.00 101,730.00 46,200.00 45,940.00 19,690.00

KET

KONSULTAN PT. MEDALION ESA PERKASINDO

MEITA M. M. TUMEWU, ST Direktur

Halaman 34 dari 266 halaman

code NO.

JENIS BAHAN

HARGA DOMINAN HARGA TERENDAH

SATUAN (Rp.)

1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57

2 Agregat Base Kelas A Agregat Base Kelas B Agregat Base Kelas C Agregat Halus Agregat Kasar Air Alang-alang Aspal Aspal Hotmix (Ready Mix) Bata merah Batako Uk. 20 x 40 x 10 Batu Alam 10 x 20 Batu apung Batu Bata Klinker Uk. 5 x 5 x 25 Batu Belah / Batu Kali / Batu Gunung Batu Belah Uk. 15 - 20 Batu Boulder Batu Bunga (Alam) Batu Candi 10 x 20 Batu Candi 30 x 30 Batu Green Bally 15 x 30 Batu Green Bally 20 x 40 Batu Palimanan 10 x 20 Batu Palimanan 15 x 30 Batu Palimanan 20 x 40 Batu Palimanan 30 x 30 Batu Pecah Uk. 0,5 - 1 Batu Pecah Uk. 1 - 3 Batu Pecah Uk. 3 - 5 Batu Pecah Uk. 5 - 7 Batu Sukabumi 10 x 20 Batu Sukabumi 15 x 15 Bensin / Premium (HET) Bensin / Premium (Industri) Butonite Patch Cansteen Gebalan Rumput Geotextile Hollow Brick Ijuk Kapur Padam Kapur sirih Karet Elastomer Kerikil Beton Kerikil Koral Uk. 1 - 3 cm Koral Sikat 2 - 3 cm Koral Sikat Panca Warna Minyak Bekisting Minyak Pelumas / Oli (Pertamina) Minyak Pelumas / Oli (Shell) Minyak Tanah / Kerosine (Industri) Pasir Kasar/ Urug Pasir Pasang / Beton Pasir Pasang (Sedang) Paving Stone t=6 cm Paving Stone t=8 cm S o l a r (HET)

a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a

3 M³ M³ M³ M³ M³ Ltr Ikat Kg Ton Bh Bh M² Kg Bh M³ M³ M³ M² M² M² M² M² M² M² M² M² M³ M³ M³ M³ M² M² Ltr Ltr Kg Bh M² M¹ Bh Kg M³ Kg Bh M³ M³ Kg Kg Ltr Ltr Ltr Ltr M³ M³ M³ Bh Bh Ltr

4 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 12,000.00 Tidak Ada 800.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada 137,500.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 15,750.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 500,000.00 475,000.00 Tidak Ada Tidak Ada Tidak Ada 6,500.00

Freq.

Jlh Data

5 2 3 2 2 3 2 2

6 3 3 2 2 2 2 2 3 2 8 4 4 2 2 7 3 2 2 4 3 2 2 4 4 4 3 0 0 0 0 3 2 3 3 2 3 2 2 7 2 2 2 2 8 5 3 2 2 3 2 2 9 7 0 3 0 3

(Rp.) 7 110,000.00 100,000.00 0.00 0.00 0.00 0.00 0.00 11,130.00 0.00 800.00 3,000.00 120,000.00 0.00 0.00 500.00 240,000.00 0.00 0.00 145,000.00 150,000.00 0.00 0.00 135,000.00 150,000.00 160,000.00 185,000.00 0.00 0.00 0.00 0.00 180,000.00 0.00 8,500.00 11,800.00 0.00 37,500.00 0.00 0.00 2,400.00 0.00 0.00 0.00 0.00 350,000.00 350,000.00 1,200,000.00 0.00 0.00 35,000.00 0.00 0.00 400,000.00 270,000.00 0.00 1,800.00 0.00 7,500.00

HARGA TERTINGGI

(Rp.) 8 110,000.00 100,000.00 0.00 0.00 0.00 0.00 0.00 11,130.00 0.00 1,000.00 3,800.00 150,000.00 0.00 0.00 143,750.00 240,000.00 0.00 0.00 150,000.00 150,000.00 0.00 0.00 145,000.00 155,000.00 175,000.00 185,000.00 0.00 0.00 0.00 0.00 180,000.00 0.00 8,500.00 11,800.00 0.00 37,500.00 0.00 0.00 3,800.00 0.00 0.00 0.00 0.00 1,300,000.00 1,200,000.00 1,200,000.00 0.00 0.00 35,000.00 0.00 0.00 550,000.00 550,000.00 0.00 18,000.00 0.00 7,500.00

HARGA RATA RATA

Harga Hasil Analisa

(Rp.) 9 110,000.00 100,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 11,130.00 Tdk Ada Data 883.33 3,400.00 135,000.00 Tdk Ada Data Tdk Ada Data 107,850.00 240,000.00 Tdk Ada Data Tdk Ada Data 147,500.00 150,000.00 Tdk Ada Data Tdk Ada Data 140,000.00 152,500.00 167,500.00 185,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 180,000.00 Tdk Ada Data 8,500.00 11,800.00 Tdk Ada Data 37,500.00 Tdk Ada Data Tdk Ada Data 3,060.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 941,666.67 883,333.33 1,200,000.00 Tdk Ada Data Tdk Ada Data 35,000.00 Tdk Ada Data Tdk Ada Data 478,571.43 454,000.00 Tdk Ada Data 7,300.00 Tdk Ada Data 7,500.00

(Rp.) 110,000.00 100,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 12,000.00 Tdk Ada Data 800.00 3,400.00 135,000.00 Tdk Ada Data Tdk Ada Data 137,500.00 240,000.00 Tdk Ada Data Tdk Ada Data 147,500.00 150,000.00 Tdk Ada Data Tdk Ada Data 140,000.00 152,500.00 167,500.00 185,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 180,000.00 Tdk Ada Data 8,500.00 11,800.00 Tdk Ada Data 37,500.00 15,750.00 Tdk Ada Data 3,060.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 941,666.67 883,333.33 1,200,000.00 Tdk Ada Data Tdk Ada Data 35,000.00 Tdk Ada Data Tdk Ada Data 500,000.00 475,000.00 Tdk Ada Data 7,300.00 Tdk Ada Data 6,500.00

Digunakan

Ket, Harga

% Deviasi

Harga Deviasi (+/-)

(Rp.) 10

(Rp.) 11

(Rp.) 12

(Rp.) 13

0.00 Penyesuaian H-Rata rata Penyesuaian Penyesuaian 0.00 H-Rata rata 0.00 0.00 H-14 H-Rata rata Penyesuaian 0.00 H-Rata rata Penyesuaian 0.00 0.00 Penyesuaian Penyesuaian Penyesuaian H-Rata rata Penyesuaian Penyesuaian Penyesuaian Penyesuaian 0.00 0.00 0.00 H-Rata rata 0.00 Penyesuaian Penyesuaian 0.00 Penyesuaian 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 H-Rata rata 0.00 Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian H-Dominan

0% 0% 0% 0% 0% 13% 13% -8% 9% 7% 11% 11% 11% 11% 0% 17% 40% 11% 0% 9% 11% 11% 9% 9% 9% 4% Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data 11% 11% 11% 12% 11% 9% 9% 11% 9% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 7% 10% 10% 100% Tidak Ada Data Tidak Ada Data 0%

333,930.00 266,220.00 285,940.00 289,790.00 289,790.00 150.00 30,000.00 11,130.00 1,500,000.00 850.00 2,365.00 135,000.00 7,090.00 1,780.00 235,200.00 240,000.00 350,000.00 147,655.00 147,500.00 179,025.00 218,530.00 218,530.00 167,475.00 190,575.00 196,350.00 185,000.00 375,000.00 337,500.00 312,500.00 287,500.00 153,565.00 135,845.00 5,320.00 11,800.00 28,645.00 51,975.00 17,325.00 7,685.00 4,048.00 14,770.00 88,595.00 1,070.00 767,815.00 326,015.00 326,015.00 11,815.00 8,865.00 12,410.00 35,000.00 53,155.00 11,416.00 205,000.00 205,000.00 205,000.00 3,500.00 4,000.00 6,500.00

H-14 H-14 H-14 H-14 H-14

0.00 0.00 0.00 0.00 0.00 20.00 3,750.00 -870.00 135,000.00 60.00 265.00 14,250.00 790.00 200.00 0.00 41,550.00 140,000.00 16,405.00 500.00 16,275.00 24,280.00 24,280.00 15,225.00 17,325.00 17,850.00 6,500.00 #VALUE! #VALUE! #VALUE! #VALUE! 17,065.00 15,095.00 590.00 1,410.00 3,185.00 4,725.00 1,575.00 855.00 368.00 1,640.00 9,845.00 120.00 85,315.00 36,225.00 36,225.00 1,315.00 985.00 1,380.00 4,020.00 5,905.00 756.00 19,670.00 19,670.00 205,000.00 #VALUE! #VALUE! 0.00

1 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84

S o l a r (Industri) Semen PC Semen Putih Semen Warna Sirtu Alam Storox-100 Tanah Biasa Tanah Liat Tanah Pilihan Trihex Paving Besi Hollow 2 x 4 cm Besi Hollow 4 x 4 cm Besi Profil Besi Siku 3 x 3 x 2 Besi Siku 3 x 3 x 3 Besi Siku 4 x 4 x 3 Besi Siku 4 x 4 x 4 Besi Siku 5 x 5 x 5 Besi Stainlessteel 1/2" Besi Stainlessteel 3/4" Besi Stainlessteel 1" Besi Stainlessteel 1 1/4" Besi Stainlessteel 1 1/2" Besi Stainlessteel 2" Besi Stainlessteel 3" Besi Stainlessteel 4" Besi strip

2 a a a a a a a a a a bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs

3 Ltr Kg Kg Kg M³ Kg M³ M³ M³ Bh M¹ M¹ Kg M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ Kg

4 10,750.00 1,700.00 5,000.00 12,000.00 Tidak Ada Tidak Ada 200,000.00 Tidak Ada Tidak Ada Tidak Ada 20,000.00 Tidak Ada Tidak Ada Tidak Ada 65,000.00 75,000.00 110,000.00 195,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada

5 2 4 5 3 2 2 2 2 2 2 -

6 3 14 19 15 3 2 5 4 4 2 14 15 3 6 10 9 10 10 2 2 2 2 2 2 2 2 3

7 11,450.00 1,180.00 1,700.00 10,000.00 450,000.00 0.00 150,000.00 150,000.00 150,000.00 0.00 18,000.00 24,000.00 12,000.00 30,500.00 45,000.00 40,000.00 40,000.00 97,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,750.00

8 11,450.00 3,000.00 5,000.00 45,000.00 450,000.00 0.00 200,000.00 200,000.00 200,000.00 0.00 102,000.00 150,000.00 12,000.00 60,000.00 70,000.00 110,000.00 120,000.00 195,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,750.00

9 11,450.00 1,765.00 3,131.76 16,769.23 450,000.00 Tdk Ada Data 183,333.33 175,000.00 175,000.00 Tdk Ada Data 52,416.67 78,615.38 12,000.00 44,375.00 59,000.00 68,285.71 90,875.00 167,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 9,750.00

10,750.00 1,700.00 5,000.00 12,000.00 450,000.00 Tdk Ada Data 200,000.00 175,000.00 175,000.00 Tdk Ada Data 20,000.00 78,615.38 12,000.00 44,375.00 65,000.00 75,000.00 110,000.00 195,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 9,750.00

10,838.00 1,700.00 2,960.00 13,860.00 151,435.00 59,065.00 64,330.00 59,065.00 80,405.00 3,545.00 20,000.00 78,615.38 20,218.00 44,375.00 65,000.00 75,000.00 110,000.00 195,000.00 91,555.00 112,220.00 129,940.00 135,845.00 141,750.00 165,285.00 141,750.00 283,500.00 92,400.00

11 Penyesuaian H-Dominan 0.00 Penyesuaian 0.00 0.00 0.00 0.00 0.00 0.00 H-Dominan H-Rata rata Penyesuaian H-Rata rata H-Dominan H-Dominan H-Dominan H-Dominan 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 H-14

85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121

Besi Warmesh θ 10 Besi Warmesh θ 6 Besi Warmesh θ 8 Bois Beton dia. 100 cm (pakai tulangan) Bois Beton dia. 100 cm (tanpa tulangan) Bois Beton dia. 150 cm (pakai tulangan) Bois Beton dia. 150 cm (tanpa tulangan) Bois Beton dia. 60 cm (pakai tulangan) Bois Beton dia. 60 cm (tanpa tulangan) Bois Beton dia. 80 cm (pakai tulangan) Bois Beton dia. 80 cm (tanpa tulangan) Kawat baja Kawat Beronjong Kawat Beronjong (Jadi) dia. 2,7 mm ( 2 x 1 x 0,5 ) Kawat Beronjong (Jadi) dia. 2,7 mm ( 3 x 1 x 0,5 ) Kawat Beronjong (Jadi) dia. 3,0 mm ( 2 x 1 x 0,5 ) Kawat Beronjong (Jadi) dia. 3,0 mm ( 3 x 1 x 0,5 ) Kawat Beton / Bendrat Kawat Duri Kawat jaring galvanis Kawat Las Pagar BRC (BRC Fence) ; tinggi = 120 cm Pagar BRC (BRC Fence) ; tinggi = 175 cm Pagar BRC (BRC Fence) ; tinggi = 90 cm Paku Asbes Bh Paku Beton Paku Genteng Metal Paku Kayu 2" s/d 6" Paku pancing Paku Reng Paku Sekrup Paku Seng Paku Tripleks Pintu gulung besi Plat Rambu Profil alumunium "T" Rel Pengaman (Guard Rail)

bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs bs

Unit Unit Unit Bh Bh Bh Bh Bh Bh Bh Bh Kg Kg M³ M³ M³ M³ Kg Kg M¹ Kg M¹ M¹ M¹ Bh Kg Kg Kg Kg Kg Kg Kg Kg M² Bh M¹ M¹

Tidak Ada

-

5

2 6 3 3 2 4 3 6 7 10 -

7 7 2 2 2 2 2 2 2 2 4 6 5 4 2 2 13 11 3 12 5 5 4 5 17 12 16 2 5 8 20 18 2 2 3 2

65,000.00 28,000.00 39,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,000.00 12,000.00 20,000.00 20,000.00 0.00 0.00 18,000.00 52,500.00 25,000.00 25,000.00 257,000.00 414,500.00 235,000.00 12,000.00 10,000.00 15,000.00 14,000.00 0.00 2,000.00 5,000.00 19,000.00 16,000.00 0.00 0.00 2,800,000.00 0.00

1,075,000.00 385,000.00 650,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25,000.00 27,500.00 320,000.00 310,000.00 0.00 0.00 170,000.00 70,000.00 25,000.00 145,000.00 300,000.00 500,000.00 250,000.00 25,000.00 40,000.00 37,000.00 17,500.00 0.00 15,000.00 20,000.00 30,000.00 310,000.00 0.00 0.00 2,800,000.00 0.00

711,666.67 294,600.00 514,800.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 22,500.00 21,125.00 186,666.67 165,000.00 Tdk Ada Data Tdk Ada Data 42,636.36 63,888.89 25,000.00 42,950.00 275,666.67 444,833.33 242,500.00 20,666.67 20,800.00 26,950.00 15,250.00 Tdk Ada Data 9,000.00 10,266.67 22,722.22 38,125.00 Tdk Ada Data Tdk Ada Data 2,800,000.00 Tdk Ada Data

711,666.67 294,600.00 650,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 22,500.00 21,125.00 186,666.67 165,000.00 Tdk Ada Data Tdk Ada Data 20,000.00 65,000.00 25,000.00 35,000.00 275,666.67 444,833.33 242,500.00 25,000.00 25,000.00 25,000.00 15,000.00 Tdk Ada Data 9,000.00 10,266.67 25,000.00 20,000.00 Tdk Ada Data Tdk Ada Data 2,800,000.00 Tdk Ada Data

1,126,125.00 410,025.00 650,000.00 330,750.00 236,250.00 413,440.00 271,690.00 236,250.00 177,190.00 295,315.00 189,000.00 34,650.00 21,125.00 436,975.00 600,600.00 496,125.00 744,190.00 23,100.00 23,625.00 46,200.00 29,530.00 693,000.00 750,750.00 577,500.00 1,000.00 25,000.00 25,000.00 20,000.00 20,000.00 20,000.00 50,000.00 25,000.00 25,000.00 885,940.00 238,735.00 23,625.00 153,565.00

Penyesuaian Penyesuaian H-Dominan 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Penyesuaian H-Rata rata Penyesuaian Penyesuaian 0.00 0.00 Penyesuaian 0.00 Penyesuaian 0.00 Penyesuaian Penyesuaian Penyesuaian 0.00 H-Dominan H-Dominan 0.00 0.00 0.00 0.00 H-Dominan 0.00 0.00 0.00 0.00 0.00

Tidak Ada 650,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 20,000.00 65,000.00 Tidak Ada 35,000.00 Tidak Ada Tidak Ada Tidak Ada 25,000.00 25,000.00 25,000.00 15,000.00 Tidak Ada Tidak Ada Tidak Ada 25,000.00 20,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada

10

12

13 1% 26% 11% 9% 11% 11% 11% 11% 11% 11% -154% 14% 9% 5% 7% 9% 12% 20% 11% 11% 11% 11% 11% 11% 11% 11% 0%

88.00 440.00 330.00 1,260.00 16,825.00 6,565.00 7,150.00 6,565.00 8,935.00 395.00 -30,820.00 11,195.38 1,838.00 2,375.00 4,620.00 6,750.00 12,870.00 38,860.00 10,175.00 12,470.00 14,440.00 15,095.00 15,750.00 18,365.00 15,750.00 31,500.00 0.00

9% 9% 6% 11% 11% 11% 11% 11% 11% 11% 11% 9% 11% 9% 9% 11% 11% 9% 11% 9% 11% 9% 9% 9% 11% -5% -26% 8% -5% 8% -16% 8% 5% 11% 11% 11% 11%

102,375.00 37,275.00 35,750.00 36,750.00 26,250.00 45,940.00 30,190.00 26,250.00 19,690.00 32,815.00 21,000.00 3,150.00 2,225.00 39,725.00 54,600.00 55,125.00 82,690.00 2,100.00 2,625.00 4,200.00 3,280.00 63,000.00 68,250.00 52,500.00 110.00 -1,250.00 -6,500.00 1,620.00 -1,000.00 1,620.00 -7,750.00 1,900.00 1,370.00 98,440.00 26,525.00 2,625.00 17,065.00

1 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185

2 Rolling Door Sekrup fixer Sekrup Galbani Besi Beton Polos Besi Beton Polos dia. 6 mm Besi Beton Polos dia. 10 mm Besi Beton Polos dia. 12 mm Besi Beton Polos dia. 14 mm Besi Beton Polos dia. 16 mm Besi Beton Ulir Besi Beton Ulir dia. 14 mm Besi Beton Ulir dia. 16 mm Besi Beton Ulir dia. 18 mm Besi Beton Ulir dia. 20 mm Besi Beton Ulir dia. 22 mm Besi Beton Ulir dia. 24 mm Beton Roster Uk. 20x20 cm Beton Roster Uk. 20x40 cm Ijuk Residu Roster Kaca Uk. 20x20 cm Roster Uk. 20x20 cm (keramik) Roster Uk. 40x40 cm (keramik) Tali ijuk Ampelas Cat Dasar /Alkali (Dulux/ Setara) Cat Kayu/Besi Mengkilap (Glotex/ Seiv/ Setara) Cat Marka Cat Menie Kayu/Besi/Seng (Glotex Setara) Cat Multiguard Cat Tembok (Dulux/ICI setara) Cat Tembok (Metrolite/ Catylac/ Setara) Cat Tembok Biasa Cat Waterproofing (Setara Aquaproof) Chipping Compound Gypsum Dempul Besi Dempul Kayu/Wood Filler (Impra Setara) Kuas Lem Eha-Bond Minyak Cat / Thiner Paper Tape Plamir Plamur Tembok (Danapaint Setara) Politur Sherlak Soda api Spiritus Teak oil Kaca One Way 10 mm Kaca One Way 5 mm Rangka Aluminium 3" coklat Rangka Aluminium 3" Silver Rangka Aluminium 4" coklat Rangka Aluminium 4" Silver Kayu Bakar Kayu Kelas I (Kayu Besi, dll.) Kayu Kelas I (Kayu Linggua,dll.) Kayu Kelas II (Kayu Cempaka, dll.) Kayu Kelas III (Kayu Nantu, dll.) Kayu Kelas IV (Kayu Telon, dll.) Perancah kayu Asbes Gelombang Besar Asbes Gelombang Kecil

bs bs bs bt bt bt bt bt bt bt bt bt bt bt bt bt btn btn btn btn btn btn btn btn cat cat cat cat cat cat cat cat cat cat cat cat cat cat cat cat cat cat cat cat cat cat cat cat cat jp jp jp jp jp jp k k k k k k k kp kp

3 M² Bh Bh Kg Ujung Ujung Ujung Ujung Ujung Kg Ujung Ujung Ujung Ujung Ujung Ujung Bh Bh M³ Lt Bh Bh Bh Kg Lbr Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Bh Ltr Ltr M¹ Kg Kg Ltr Kg Kg Ltr Ltr M² M2 Ujg Ujg Ujg Ujg M³ M³ M³ M³ M³ M³ M³ Lbr Lbr

4 Tidak Ada Tidak Ada Tidak Ada Tidak Ada 30,000.00 65,000.00 105,000.00 135,000.00 175,000.00 Tidak Ada 135,000.00 175,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 3,000.00 115,000.00 55,000.00 Tidak Ada 30,000.00 50,000.00 Tidak Ada 95,000.00 40,000.00 50,000.00 Tidak Ada 75,000.00 35,000.00 30,000.00 Tidak Ada 35,000.00 22,500.00 10,000.00 40,000.00 45,000.00 45,000.00 Tidak Ada 25,000.00 10,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 10,000,000.00 10,000,000.00 7,000,000.00 5,000,000.00 1,800,000.00 2,100,000.00 Tidak Ada 35,000.00

5 4 3 3 3 3 2 3 3 3 6 2 2 4 5 4 3 3 3 7 6 2 2 3 2 2 5 2 2 2 2 3 2 2

6 3 5 2 2 17 19 19 14 14 2 6 10 4 2 4 2 5 4 3 2 8 12 3 5 14 16 18 2 15 4 13 15 15 18 2 18 12 17 3 18 21 6 10 11 11 2 12 13 2 2 2 2 2 2 2 2 4 4 6 8 6 2 4 4

7 130,000.00 500.00 0.00 0.00 22,000.00 32,000.00 70,000.00 130,000.00 27,500.00 0.00 105,000.00 161,000.00 234,000.00 0.00 307,500.00 0.00 16,000.00 58,000.00 10,000.00 0.00 20,000.00 22,500.00 58,000.00 8,000.00 2,500.00 50,000.00 45,000.00 0.00 28,000.00 50,000.00 50,000.00 90,000.00 26,000.00 20,000.00 0.00 5,000.00 22,500.00 17,000.00 23,000.00 5,000.00 19,000.00 7,500.00 40,000.00 20,000.00 45,000.00 0.00 10,000.00 8,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,000,000.00 8,000,000.00 3,000,000.00 1,900,000.00 1,500,000.00 0.00 35,000.00 35,000.00

8 130,000.00 10,000.00 0.00 0.00 31,000.00 73,000.00 105,000.00 175,000.00 180,000.00 0.00 155,000.00 176,000.00 240,000.00 0.00 355,000.00 0.00 45,000.00 75,000.00 10,000.00 0.00 35,000.00 50,000.00 58,000.00 15,000.00 15,000.00 150,000.00 94,000.00 0.00 343,000.00 50,000.00 269,000.00 110,000.00 50,000.00 850,000.00 0.00 90,000.00 110,000.00 72,500.00 23,000.00 60,000.00 80,000.00 10,000.00 58,000.00 60,000.00 70,000.00 0.00 47,500.00 220,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,500,000.00 9,500,000.00 5,750,000.00 4,500,000.00 1,900,000.00 0.00 40,000.00 35,000.00

9 130,000.00 6,500.00 Tdk Ada Data Tdk Ada Data 26,966.67 61,970.59 91,705.88 140,500.00 157,083.33 Tdk Ada Data 132,500.00 170,750.00 237,000.00 Tdk Ada Data 331,250.00 Tdk Ada Data 33,666.67 66,500.00 10,000.00 Tdk Ada Data 23,916.67 37,100.00 58,000.00 11,000.00 5,791.67 116,285.71 56,875.00 Tdk Ada Data 70,500.00 50,000.00 163,681.82 100,307.69 41,846.15 140,906.25 Tdk Ada Data 65,968.75 44,300.00 40,000.00 23,000.00 30,062.50 28,052.63 8,875.00 45,937.50 46,055.56 55,888.89 Tdk Ada Data 30,250.00 30,681.82 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 8,750,000.00 8,750,000.00 4,812,500.00 2,883,333.33 1,687,500.00 Tdk Ada Data 37,500.00 35,000.00

10 130,000.00 6,500.00 Tdk Ada Data Tdk Ada Data 30,000.00 65,000.00 105,000.00 135,000.00 175,000.00 Tdk Ada Data 135,000.00 175,000.00 237,000.00 Tdk Ada Data 331,250.00 Tdk Ada Data 33,666.67 66,500.00 10,000.00 Tdk Ada Data 23,916.67 37,100.00 58,000.00 11,000.00 3,000.00 115,000.00 55,000.00 Tdk Ada Data 30,000.00 50,000.00 163,681.82 95,000.00 40,000.00 50,000.00 Tdk Ada Data 75,000.00 35,000.00 30,000.00 23,000.00 35,000.00 22,500.00 10,000.00 40,000.00 45,000.00 45,000.00 Tdk Ada Data 25,000.00 10,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 10,000,000.00 10,000,000.00 7,000,000.00 5,000,000.00 1,800,000.00 2,100,000.00 37,500.00 35,000.00

2,021,250.00 235.00 710.00 11,700.00 34,650.00 65,000.00 105,000.00 135,000.00 175,000.00 12,815.00 135,000.00 175,000.00 237,000.00 379,780.00 331,250.00 471,915.00 14,770.00 17,720.00 46,200.00 38,395.00 23,916.67 43,318.00 58,000.00 28,875.00 3,465.00 59,065.00 55,000.00 129,590.00 46,200.00 51,975.00 75,600.00 23,625.00 17,720.00 57,750.00 1,420.00 11,815.00 57,750.00 46,200.00 14,175.00 40,425.00 22,500.00 1,180.00 23,230.00 21,160.00 45,000.00 59,065.00 11,815.00 11,550.00 33,370.00 1,181,250.00 606,375.00 167,475.00 144,375.00 225,225.00 171,280.00 236,250.00 10,000,000.00 10,000,000.00 7,350,000.00 5,250,000.00 1,800,000.00 2,200,000.00 46,200.00 31,310.00

11 Penyesuaian 0.00 0.00 0.00 Penyesuaian H-Dominan H-Dominan H-Dominan H-Dominan 0.00 H-Dominan H-Dominan H-Rata rata 0.00 H-Rata rata 0.00 0.00 0.00 Penyesuaian 0.00 H-Rata rata Penyesuaian H-Rata rata Penyesuaian Penyesuaian 0.00 H-Dominan 0.00 Penyesuaian Penyesuaian 0.00 0.00 0.00 Penyesuaian 0.00 0.00 Penyesuaian Penyesuaian 0.00 Penyesuaian H-Dominan 0.00 0.00 0.00 H-Dominan 0.00 0.00 Penyesuaian 0.00 0.00 Penyesuaian Penyesuaian Penyesuaian Penyesuaian 0.00 0.00 H-Dominan H-Dominan Penyesuaian Penyesuaian H-Dominan Penyesuaian Penyesuaian 0.00

12 9% 11% 11% 11% 9% 3% 20% 3% 4% 11% 0% 6% 4% 11% 3% 11% 11% 11% 9% 11% 1% 9% 9% 9% 9% 11% 14% 11% 9% 9% 11% 11% 11% 9% 11% 11% 9% 9% 11% 9% 7% 11% 11% 11% 12% 11% 11% 9% 11% 11% 9% 9% 9% 9% 11% 11% 0% 0% 5% 5% 0% 5% 9% 11%

13 183,750.00 25.00 80.00 1,300.00 3,150.00 2,000.00 21,000.00 3,750.00 7,000.00 1,425.00 70.00 9,800.00 8,560.00 42,200.00 11,130.00 52,435.00 1,640.00 1,970.00 4,200.00 4,265.00 286.67 3,938.00 5,500.00 2,625.00 315.00 6,565.00 7,750.00 14,400.00 4,200.00 4,725.00 8,400.00 2,625.00 1,970.00 5,250.00 160.00 1,315.00 5,250.00 4,200.00 1,575.00 3,675.00 1,500.00 130.00 2,580.00 2,350.00 5,620.00 6,565.00 1,315.00 1,050.00 3,710.00 131,250.00 55,125.00 15,225.00 13,125.00 20,475.00 19,030.00 26,250.00 0.00 0.00 350,000.00 250,000.00 0.00 100,000.00 4,200.00 3,480.00

1 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249

2 Atap alumunium gelombang tebal 0.55 mm Atap Genteng Metal (setara Multi Roof) Atap Genteng Metal (setara Sakura Roof:80 cmX 80 cm) Atap Onduline Gelombang 0.95 * 1.95 M Atap Spandek Bubungan Genteng Metal (setara Multi Roof) Bubungan Genteng Metal (setara Sakura Roof) Eternit (Asbes) Flashing Genteng Metal (setara Multi Roof) Flashing Genteng Metal (setara Sakura Roof) Genteng (setara Genteng Kodok) Genteng Aspal Genteng Beton Genteng Kaca Genteng Keramik Genteng Sirap Karpus Asbes Gelombang Besar Karpus Asbes Gelombang Kecil Karpus Genteng (setara Genteng Kodok) Karpus Genteng Beton Karpus Genteng Keramik Kaso 3/5 Nok alumunium standar 40 cm 18, swg 22 Nok genteng beton Nok Samping Genteng Metal (setara Multi Roof) Nok Samping Genteng Metal (setara Sakura Roof) Policarbonate Seng Fiberglass Seng Gelombang Alluminium 0,25 mm Seng Gelombang Alluminium 0,30 mm Seng Plat Alluminium 0,25 mm Seng Plat Alluminium 0,30 mm Seng Fiberglass Laserlite Plus (uk. 180 x 86 x 0,9 cm) Seng Gelombang BJLS 20 Seng Gelombang BJLS 24 Seng Gelombang BJLS 25 Seng Gelombang BJLS 30 (uk. 180 x 90 x 0,3 cm) Seng Plat BJLS 20 Seng Plat BJLS 25 Seng Plat BJLS 30 (uk. 91,4 x 182,9 cm) Internal cove artistik (5 x5x20) cm Marmer Plint keramik arttistik uk. 10 x 10 cm Plint keramik arttistik uk. 10 x 20 cm Shower Screen Aluminium Tegel Abu-Abu uk. 20x20 cm Tegel Abu-Abu uk. 30x30 cm Tegel Abu-Abu uk. 40x40 cm Tegel Berwarna uk. 20x20 cm Tegel Berwarna uk. 30x30 cm Tegel Berwarna uk. 40x40 cm Tegel Esenza uk. 40x40 cm Tegel granite dinding 20 x 20 Tegel granite dinding 25 x 50 Tegel granite dinding 25 x 60 Tegel granite dinding 30 x 30 Tegel granite dinding 30 x 60 Tegel granite lantai 20 x 20 Tegel granite lantai 30 x 30 Tegel granite lantai 40 x 40 Tegel granite lantai 50 x 50 Tegel granite lantai 60 x 60 Tegel granite lantai 80 x 80 Tegel Granito uk. 30x30 cm

kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kp kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr

3 M² M² M² M² Ujg Bh Bh M² M¹ M¹ Bh Lbr Lbr Bh Bh Bh Lbr Lbr Bh Bh Bh Btg Lbr Bh Bh Bh M² Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

4 Tidak Ada 90,000.00 30,000.00 150,000.00 Tidak Ada Tidak Ada 30,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 75,000.00 53,000.00 Tidak Ada 50,000.00 Tidak Ada 80,000.00 42,000.00 Tidak Ada Tidak Ada Tidak Ada 45,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 65,000.00 65,000.00 70,000.00 65,000.00 65,000.00 60,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada

5 3 4 2 3 2 4 3 3 2 7 3 3 2 6 2 2 2 -

6 3 9 11 6 2 6 8 3 2 2 2 2 3 2 2 2 2 2 2 2 2 4 4 3 4 5 5 7 15 5 12 6 10 14 3 4 6 13 4 4 2 2 2 2 4 8 7 8 11 9 12 3 3 1 3 3 3 3 3 4 3 5 2 2

7 55,000.00 46,000.00 30,000.00 42,000.00 0.00 27,500.00 27,500.00 33,000.00 0.00 0.00 0.00 0.00 10,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,000.00 15,000.00 55,000.00 40,000.00 30,000.00 50,000.00 60,000.00 47,000.00 62,000.00 25,000.00 53,000.00 65,000.00 40,000.00 55,000.00 49,000.00 49,000.00 15,000.00 20,000.00 25,000.00 0.00 0.00 0.00 0.00 50,000.00 60,000.00 65,000.00 55,000.00 57,500.00 50,000.00 60,000.00 125,000.00 68,000.00 78,000.00 95,000.00 72,500.00 165,000.00 68,000.00 72,500.00 75,000.00 95,000.00 175,000.00 0.00 0.00

8 55,000.00 90,000.00 46,000.00 155,000.00 0.00 35,000.00 35,000.00 33,000.00 0.00 0.00 0.00 0.00 10,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,850,000.00 25,000.00 55,000.00 65,000.00 45,000.00 1,650,000.00 90,000.00 55,000.00 75,000.00 57,500.00 70,000.00 85,000.00 45,000.00 55,000.00 55,000.00 85,000.00 50,000.00 55,000.00 75,000.00 0.00 0.00 0.00 0.00 65,000.00 68,000.00 70,000.00 75,000.00 65,000.00 75,000.00 85,000.00 125,000.00 68,000.00 78,000.00 95,000.00 72,500.00 165,000.00 68,000.00 72,500.00 225,000.00 95,000.00 225,000.00 0.00 0.00

9 55,000.00 79,857.14 32,777.78 124,250.00 Tdk Ada Data 31,000.00 30,083.33 33,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 10,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 932,500.00 20,000.00 55,000.00 52,500.00 35,833.33 1,100,000.00 74,000.00 52,769.23 68,166.67 50,450.00 59,500.00 77,500.00 42,520.83 55,000.00 52,000.00 62,000.00 42,636.36 37,500.00 50,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 57,500.00 63,833.33 66,600.00 67,833.33 63,277.78 63,214.29 67,950.00 125,000.00 68,000.00 78,000.00 95,000.00 72,500.00 165,000.00 68,000.00 72,500.00 150,000.00 95,000.00 195,000.00 Tdk Ada Data Tdk Ada Data

10 55,000.00 90,000.00 30,000.00 150,000.00 Tdk Ada Data 31,000.00 30,000.00 33,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 10,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 932,500.00 20,000.00 55,000.00 52,500.00 35,833.33 1,100,000.00 75,000.00 53,000.00 68,166.67 50,000.00 59,500.00 80,000.00 42,000.00 55,000.00 52,000.00 62,000.00 45,000.00 37,500.00 50,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 57,500.00 65,000.00 65,000.00 70,000.00 65,000.00 65,000.00 60,000.00 125,000.00 68,000.00 78,000.00 95,000.00 72,500.00 165,000.00 68,000.00 72,500.00 150,000.00 95,000.00 195,000.00 Tdk Ada Data Tdk Ada Data

63,525.00 90,000.00 63,525.00 93,555.00 76,780.00 54,868.00 39,270.00 33,000.00 35,440.00 32,490.00 41,345.00 82,690.00 34,650.00 53,155.00 35,440.00 5,905.00 41,345.00 27,170.00 20,680.00 11,815.00 32,490.00 26,585.00 57,750.00 41,345.00 40,165.00 35,833.33 127,050.00 64,970.00 53,000.00 68,166.67 50,000.00 59,500.00 80,000.00 42,000.00 55,000.00 66,418.00 75,075.00 45,000.00 60,060.00 67,573.00 5,905.00 354,375.00 3,545.00 3,835.00 2,887,500.00 2,365.00 5,490.00 11,125.00 2,655.00 5,905.00 11,500.00 82,690.00 35,440.00 78,000.00 70,875.00 115,500.00 134,665.00 59,065.00 83,743.00 95,680.00 115,500.00 195,000.00 333,710.00 35,440.00

11 Penyesuaian H-Dominan Penyesuaian Penyesuaian 0.00 Penyesuaian Penyesuaian H-Rata rata 0.00 0.00 0.00 0.00 Penyesuaian 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Penyesuaian 0.00 0.00 H-Rata rata Penyesuaian 0.00 H-Dominan H-Rata rata H-Dominan H-Rata rata H-Dominan H-Dominan H-Rata rata Penyesuaian Penyesuaian H-Dominan Penyesuaian Penyesuaian 0.00 0.00 0.00 0.00 Penyesuaian 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 H-Rata rata 0.00 Penyesuaian 0.00 0.00 Penyesuaian 0.00 Penyesuaian H-Rata rata 0.00 0.00

12 9% 20% 9% 9% 11% 9% 9% 5% 11% 11% 11% 11% 9% 11% 11% 11% 11% 11% 11% 11% 11% 11% 9% 11% 11% 0% 9% 11% 5% 14% 12% 8% 2% 5% 5% 9% 9% 12% 9% 9% 11% 11% 11% 11% 9% 11% 11% 11% 11% 11% 24% 11% 11% 100% 11% 9% 11% 11% 9% 11% 9% 19% 11% 11%

13 5,775.00 17,810.00 5,775.00 8,505.00 8,530.00 4,988.00 3,570.00 1,500.00 3,940.00 3,610.00 4,595.00 9,190.00 3,150.00 5,905.00 3,940.00 655.00 4,595.00 3,020.00 2,300.00 1,315.00 3,610.00 2,955.00 5,250.00 4,595.00 4,465.00 133.33 11,550.00 7,220.00 2,600.00 9,366.67 5,900.00 4,900.00 1,250.00 2,100.00 2,500.00 6,038.00 6,825.00 5,620.00 5,460.00 6,143.00 655.00 39,375.00 395.00 425.00 262,500.00 265.00 610.00 1,235.00 295.00 655.00 2,750.00 9,190.00 3,940.00 78,000.00 7,875.00 10,500.00 14,965.00 6,565.00 7,613.00 10,630.00 10,500.00 37,500.00 37,080.00 3,940.00

1 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313

2 Tegel Granito uk. 40x40 cm Tegel Keramik uk. 10x20 cm Tegel Keramik uk. 10x33 cm Tegel Keramik uk. 11x11 cm Tegel Keramik uk. 15x15 cm Tegel Keramik uk. 15x20 cm Tegel Keramik uk. 20x20 cm Tegel Keramik uk. 20x25 cm Tegel Keramik uk. 25x25 cm Tegel Keramik uk. 30x30 cm Tegel Keramik uk. 30x30 cm antislip Tegel Keramik uk. 33x33 cm Tegel Keramik uk. 33x33 cm anti slip Tegel Keramik uk. 40x40 cm anti slip Tegel mosaik 30 x 30 cm, ex lokal Tegel Plint granito uk. 10x30 cm Tegel Plint granito uk. 10x40 cm Tegel Plint granito uk. 15x30 cm Tegel Plint pc abu-abu uk. 15x30 cm Tegel Plint pc abu-abu uk. 10x30 cm Tegel Plint pc abu-abu uk. 10x40 cm Tegel Plint pc warna uk. 10x40 cm Tegel Plint teralux kerang uk. 10x30 cm Tegel Plint teralux kerang uk. 10x40 cm Tegel Plint teralux kerang uk. 15x30 cm Tegel Plint teralux marmer uk. 10x30 cm Tegel Plint teralux marmer uk. 10x40 cm Tegel Plint teralux marmer uk. 10x60 cm Tegel Plint Teraso uk. 10x30 cm Tegel Plint Teraso uk. 10x40 cm Tegel Plint Teraso uk. 15x30 cm Tegel Plint warna uk. 10x20 cm Tegel Porselin putih uk. 11x11 cm Tegel teralux kerang uk. 30 x 30 cm Tegel teralux kerang uk. 40 x 40 cm Tegel teralux marmer uk. 40 x 40 cm Tegel teralux marmer uk. 60 x 60 cm Tegel Wafel uk. 20x20 cm Ubin keramik arttistik uk. 10 x 10 cm Ubin keramik arttistik uk. 10 x 20 cm Ubin keramik arttistik uk. 15 x 15 cm Ubin keramik arttistik uk. 5 x 20 cm Ubin tahan asam Bak Cuci Stainless Steel (1 Lobang) Bak Cuci Stainless Steel (2 Lobang) Bak Mandi Fiberglass Bathub Biofill BF 8 Floor Drain Jet Pump Grundfos; Head 50 m; kap. 72 l/dt Jet Pump; Head 30 m; kap. 30 l/dt Kitchen Set Kloset Duduk Keramik Standar Kloset Jongkok Keramik Standar Kloset Monoblok Lokal Mata Kran Standar 1/2" Mata Kran Standar 3/4" Pipa Galvanis (medium A) dia. 1" Pipa Galvanis (medium A) dia. 1/2" Pipa Galvanis (medium A) dia. 2" Pipa Galvanis (medium A) dia. 3" Pipa Galvanis (medium A) dia. 3/4" Pipa Galvanis (medium B) dia. 1" Pipa Galvanis (medium B) dia. 1/2"

kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr kr la la la la la la la la la la la la la la la la la la la la la

3 Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh M² Bh Bh Bh Bh Bh Bh Unit Unit M¹ Bh Bh Bh Bh Bh M¹ M¹ M¹ M¹ M¹ M¹ M¹

4 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 60,000.00 65,000.00 65,000.00 Tidak Ada 65,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 200,000.00 400,000.00 350,000.00 Tidak Ada Tidak Ada 17,500.00 Tidak Ada Tidak Ada Tidak Ada 650,000.00 130,000.00 Tidak Ada 15,000.00 25,000.00 135,000.00 Tidak Ada 350,000.00 Tidak Ada Tidak Ada Tidak Ada 55,000.00

5 3 4 2 2 2 2 2 2 2 3 6 4 2 2 2

6 2 3 2 2 2 2 8 7 5 7 6 2 2 4 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 2 2 2 2 2 15 15 9 4 2 9 5 5 4 18 17 5 16 14 10 11 10 10 11 7 8

7 0.00 65,000.00 0.00 0.00 0.00 0.00 60,000.00 63,500.00 65,000.00 50,000.00 65,000.00 0.00 0.00 75,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65,000.00 0.00 0.00 0.00 0.00 0.00 160,000.00 200,000.00 250,000.00 2,575,000.00 0.00 15,000.00 2,000,000.00 755,000.00 1,008,000.00 95,000.00 100,000.00 605,000.00 10,000.00 15,000.00 135,000.00 65,000.00 250,000.00 140,000.00 100,000.00 42,000.00 52,500.00

8 0.00 65,000.00 0.00 0.00 0.00 0.00 65,000.00 65,000.00 75,000.00 77,000.00 77,000.00 0.00 0.00 85,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65,000.00 0.00 0.00 0.00 0.00 0.00 638,000.00 960,000.00 430,000.00 2,800,000.00 0.00 50,000.00 2,920,000.00 2,300,000.00 2,500,000.00 1,800,000.00 2,500,000.00 1,100,000.00 175,000.00 35,000.00 200,000.00 135,000.00 475,000.00 1,025,000.00 155,000.00 100,000.00 170,000.00

9 Tdk Ada Data 65,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 62,250.00 64,700.00 68,333.33 62,800.00 70,500.00 Tdk Ada Data Tdk Ada Data 80,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 65,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 294,076.92 494,307.69 325,714.29 2,687,500.00 Tdk Ada Data 28,571.43 2,573,333.33 1,518,333.33 1,754,000.00 613,500.00 603,333.33 835,000.00 30,821.43 23,191.67 174,187.50 103,555.56 352,375.00 577,312.50 134,444.44 81,200.00 75,750.00

10 Tdk Ada Data 65,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 60,000.00 65,000.00 65,000.00 62,800.00 65,000.00 Tdk Ada Data Tdk Ada Data 80,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 65,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 200,000.00 400,000.00 350,000.00 2,687,500.00 Tdk Ada Data 17,500.00 2,573,333.33 1,518,333.33 1,754,000.00 650,000.00 130,000.00 835,000.00 15,000.00 25,000.00 135,000.00 103,555.56 350,000.00 577,312.50 134,444.44 81,200.00 55,000.00

59,065.00 1,500.00 2,275.00 1,305.00 2,125.00 2,365.00 3,000.00 3,750.00 4,700.00 6,800.00 6,850.00 10,520.00 10,285.00 13,700.00 56,115.00 35,440.00 40,165.00 37,800.00 2,070.00 1,780.00 1,890.00 2,079.00 36,620.00 36,620.00 38,980.00 41,345.00 42,525.00 44,305.00 7,090.00 7,685.00 5,320.00 2,655.00 1,000.00 33,075.00 49,615.00 100,405.00 177,190.00 1,945.00 4,140.00 8,270.00 9,305.00 4,140.00 76,780.00 200,000.00 519,750.00 577,500.00 3,465,000.00 10,741,500.00 23,100.00 3,465,000.00 1,732,500.00 1,754,000.00 981,750.00 202,125.00 1,097,250.00 64,900.00 108,515.00 41,345.00 23,625.00 79,740.00 132,895.00 32,490.00 17,720.00 10,630.00

11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Penyesuaian 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 H-Dominan Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian H-Rata rata Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian 0.00 0.00 0.00 0.00 0.00 0.00 0.00

12 11% 13% -2% 11% 11% 11% 21% 30% 11% 35% 0% 11% 11% 0% 11% 11% 11% 11% 11% 11% 11% 9% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% -31% 9% 9% 9% 9% 9% 9% 9% 10% 9% 9% 9% 9% 9% 11% 11% 11% 11% 11% 11% 11%

13 6,565.00 190.00 -35.00 145.00 235.00 265.00 640.00 1,120.00 530.00 2,400.00 20.00 1,170.00 1,145.00 40.00 6,235.00 3,940.00 4,465.00 4,200.00 230.00 200.00 210.00 189.00 4,070.00 4,070.00 4,330.00 4,595.00 4,725.00 4,925.00 790.00 855.00 590.00 295.00 110.00 3,675.00 5,515.00 11,155.00 19,690.00 215.00 460.00 920.00 1,035.00 460.00 8,530.00 -62,500.00 47,250.00 52,500.00 315,000.00 976,500.00 2,100.00 315,000.00 157,500.00 179,000.00 89,250.00 18,375.00 99,750.00 5,900.00 9,865.00 4,595.00 2,625.00 8,860.00 14,765.00 3,610.00 1,970.00 1,180.00

1 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377

2 Pipa Galvanis (medium B) dia. 2" Pipa Galvanis (medium B) dia. 3" Pipa Galvanis (medium B) dia. 3/4" Pipa Galvanis Light (biasa) dia. 1" Pipa Galvanis Light (biasa) dia. 1/2" Pipa Galvanis Light (biasa) dia. 2" Pipa Galvanis Light (biasa) dia. 3" Pipa Galvanis Light (biasa) dia. 3/4" Pipa Polyethylene (PE) dia. 1" Pipa Polyethylene (PE) dia. 3/4" Pipa Polyteline PE dia. 1 1/2" Pipa Porous Pipa PVC dia. 1" AW Pipa PVC dia. 1,5" AW Pipa PVC dia. 2" AW Pipa PVC (S-12,5) dia. 1/2" AW Pipa PVC (S-12,5) dia. 3/4" AW Pipa PVC dia. 1 1/4" AW Pipa PVC dia. 1/2" AW Pipa PVC dia. 3" AW Pipa PVC dia. 3/4" AW Pipa PVC dia. 4" AW Pipa GIP (Medium SII) Ø 12" Pipa GIP (Medium SII) Ø 10" Pipa GIP (Medium SII) Ø 8" Pipa GIP (Medium SII) Ø 6" Pipa GIP (Medium SII) Ø 4" Pipa GIP (Medium SII) Ø 3" Pipa GIP (Medium SII) Ø 2" Pipa PVC S-10 Ø 12" RR Pipa PVC S-10 Ø 10" RR Pipa PVC S-10 Ø 8" RR Pipa PVC S-10 Ø 6" RR Pipa PVC S-10 Ø 4" RR Pipa PVC S-10 Ø 3" RR Pipa PVC S-10 Ø 2" RR Pipa PVC S-10 Ø 1½" SC Pipa PVC S-10 Ø 1" SC Pipa PVC S-10 Ø 3/4" SC Pipa PVC S-10 Ø 1/2" SC Pipa PVC S-12,5 Ø 12" RR Pipa PVC S-12,5 Ø 10" RR Pipa PVC S-12,5 Ø 8" RR Pipa PVC S-12,5 Ø 6" RR Pipa PVC S-12,5 Ø 4" RR Pipa PVC S-12,5 Ø 3" RR Pipa PVC S-12,5 Ø 2" RR Pipa PVC S-12,5 Ø 1½" SC Pipa PVC S-12,5 Ø 1" SC Pipa PVC S-12,5 Ø 3/4" SC Pipa PVC S-12,5 Ø 1/2" SC Pipa PE S8-SDR17 (PN10) Ø 12" (315 mm) Pipa PE S8-SDR17 (PN10) Ø 10" (250 mm) Pipa PE S8-SDR17 (PN10) Ø 8" (200 mm) Pipa PE S8-SDR17 (PN10) Ø 6" (160 mm) Pipa PE S8-SDR17 (PN10) Ø 4" (110 mm) Pipa PE S8-SDR17 (PN10) Ø 3" (90 mm) Pipa PE S8-SDR17 (PN10) Ø 2" (63 mm) Pipa PE S8-SDR17 (PN10) Ø 1½" (50 mm) Pipa PE S8-SDR17 (PN10) Ø 11/4" (40 mm) Pipa PE S8-SDR17 (PN10) Ø 1" (32 mm) Pipa PE S8-SDR17 (PN10) Ø ¾" (25 mm) Pipa PE S8-SDR17 (PN10) Ø ½" (20 mm) Pipa PE S8-SDR17 (PN10) Ø 1½" (50 mm)

la la la la la la la la la la la la la la la la la la la la la la

3 M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹

4 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 12,500.00 Tidak Ada Tidak Ada Tidak Ada 35,000.00 60,000.00 75,000.00 20,000.00 Tidak Ada 52,000.00 20,000.00 155,000.00 27,000.00 240,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada

5 2 5 4 3 2 2 7 3 3 3 -

6 7 5 6 3 4 4 3 4 5 5 4 2 19 19 19 8 7 13 14 17 15 16 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

7 150,000.00 58,000.00 68,500.00 53,500.00 32,500.00 113,000.00 256,500.00 42,000.00 12,000.00 8,000.00 6,500.00 0.00 25,000.00 20,000.00 53,500.00 19,000.00 25,000.00 37,500.00 13,000.00 108,000.00 18,000.00 130,000.00 1,318,680.00 986,535.00 701,800.00 484,366.67 302,316.67 208,816.67 126,683.33 977,279.17 614,304.17 395,445.83 248,425.00 118,416.67 79,033.33 45,150.00 24,066.67 10,583.33 9,416.67 6,133.33 800,608.33 503,566.67 322,241.67 202,741.67 95,679.17 66,104.17 32,225.00 24,066.67 10,583.33 9,416.67 6,133.33 1,117,115.00 702,100.00 451,510.00 288,880.00 138,130.00 92,495.00 46,195.00 16,400.00 14,500.00 12,500.00 11,500.00 10,000.00 16,400.00

8 9 225,000.00 178,300.00 178,300.00 400,000.00 277,666.67 277,666.67 80,000.00 74,000.00 74,000.00 53,500.00 53,500.00 53,500.00 47,500.00 40,000.00 40,000.00 135,000.00 124,000.00 124,000.00 256,500.00 256,500.00 256,500.00 75,000.00 58,500.00 58,500.00 12,500.00 12,333.33 12,500.00 9,500.00 8,833.33 8,833.33 7,000.00 6,750.00 6,750.00 0.00 Tdk Ada Data Tdk Ada Data 40,000.00 35,588.24 35,000.00 115,000.00 60,694.12 60,000.00 151,000.00 78,882.35 75,000.00 27,500.00 21,516.67 20,000.00 28,200.00 26,840.00 26,840.00 60,000.00 52,636.36 52,000.00 65,000.00 22,966.67 20,000.00 167,000.00 149,333.33 155,000.00 29,000.00 26,130.77 27,000.00 270,000.00 233,785.71 240,000.00 1,318,680.00 1,318,680.00 1,318,680.00 986,535.00 986,535.00 986,535.00 701,800.00 701,800.00 701,800.00 484,366.67 484,366.67 484,366.67 302,316.67 302,316.67 302,316.67 208,816.67 208,816.67 208,816.67 126,683.33 126,683.33 126,683.33 977,279.17 977,279.17 977,279.17 614,304.17 614,304.17 614,304.17 395,445.83 395,445.83 395,445.83 248,425.00 248,425.00 248,425.00 118,416.67 118,416.67 118,416.67 79,033.33 79,033.33 79,033.33 45,150.00 45,150.00 45,150.00 24,066.67 24,066.67 24,066.67 10,583.33 10,583.33 10,583.33 9,416.67 9,416.67 9,416.67 6,133.33 6,133.33 6,133.33 800,608.33 800,608.33 800,608.33 503,566.67 503,566.67 503,566.67 322,241.67 322,241.67 322,241.67 202,741.67 202,741.67 202,741.67 95,679.17 95,679.17 95,679.17 66,104.17 66,104.17 66,104.17 32,225.00 32,225.00 32,225.00 24,066.67 24,066.67 24,066.67 10,583.33 10,583.33 10,583.33 9,416.67 9,416.67 9,416.67 6,133.33 6,133.33 6,133.33 1,117,115.00 1,117,115.00 1,117,115.00 702,100.00 702,100.00 702,100.00 451,510.00 451,510.00 451,510.00 288,880.00 288,880.00 288,880.00 138,130.00 138,130.00 138,130.00 92,495.00 92,495.00 92,495.00 46,195.00 46,195.00 46,195.00 16,400.00 16,400.00 16,400.00 14,500.00 14,500.00 14,500.00 12,500.00 12,500.00 12,500.00 11,500.00 11,500.00 11,500.00 10,000.00 10,000.00 10,000.00 16,400.00 16,400.00 16,400.00

10

100,835.00 64,970.00 14,770.00 17,720.00 8,865.00 28,125.00 62,020.00 11,815.00 13,860.00 9,823.00 28,875.00 38,635.00 6,930.00 11,550.00 17,325.00 4,870.00 5,905.00 9,240.00 4,620.00 28,875.00 5,203.00 48,510.00 1,318,680.00 986,535.00 701,800.00 484,366.67 302,316.67 208,816.67 126,683.33 977,279.17 614,304.17 395,445.83 248,425.00 118,416.67 79,033.33 45,150.00 24,066.67 10,583.33 9,416.67 6,133.33 800,608.33 503,566.67 322,241.67 202,741.67 95,679.17 66,104.17 32,225.00 24,066.67 10,583.33 9,416.67 6,133.33 1,117,115.00 702,100.00 451,510.00 288,880.00 138,130.00 92,495.00 46,195.00 16,400.00 14,500.00 12,500.00 11,500.00 10,000.00 16,400.00

11

12

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Penyesuaian Penyesuaian Penyesuaian 0.00 Penyesuaian Penyesuaian Penyesuaian 0.00 0.00 Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata

11% 11% 11% 11% 11% 11% 11% 11% 9% 9% 9% 11% 9% 9% 9% 11% 11% 9% 9% 9% 9% 9% Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data

13 11,205.00 7,220.00 1,640.00 1,970.00 985.00 3,125.00 6,890.00 1,315.00 1,260.00 893.00 2,625.00 4,295.00 630.00 1,050.00 1,575.00 540.00 655.00 840.00 420.00 2,625.00 473.00 4,410.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 288,880.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

1 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441

2 Pipa PE S8-SDR17 (PN10) Ø 1" (32 mm) Pipa PE S8-SDR17 (PN10) Ø 3/4" (25 mm) Pipa PE S8-SDR17 (PN10) Ø 1/2" (20 mm) Accessories Gate Valve Double Flanged CI Ø 2" Accessories Gate Valve Double Flanged CI Ø 3" Accessories Gate Valve Double Flanged CI Ø 4" Accessories Gate Valve Double Flanged CI Ø 6" Accessories Gate Valve Double Flanged CI Ø 8" Accessories Gate Valve Double Flanged CI Ø 10" Accessories Gate Valve Double Flanged CI Ø 12" Accessories Stop Kran Ø 100 mm Accessories Stop Kran Ø 75 mm Accessories Stop Kran Ø 50 mm Accessories Stop Kran Ø 25 mm Accessories Stop Kran Ø 20 mm Accessories Check Valve (Non Return Valve) Ø 4" Accessories Check Valve (Non Return Valve) Ø 6" Accessories Check Valve (Non Return Valve) Ø 8" Accessories Check Valve (Non Return Valve) Ø 10" Accessories Check Valve (Non Return Valve) Ø 12" Accessories DF. Water Meter Ø 1/2" Accessories DF. Water Meter Ø 2" Accessories DF. Water Meter Ø 3" Accessories DF. Water Meter Ø 4" Accessories DF. Water Meter Ø 6" Accessories DF. Water Meter Ø 8" Accessories DF. Water Meter Ø 10" Accessories DF. Water Meter Ø 12" Accessories Flanged Air Relief Valve Ø 50 mm Accessories Air Vent GIP Ø 3" Accessories All Flanged Tee PVC Ø 4" x 4" Accessories All Flanged Tee PVC Ø 3" x 3" Accessories All Flanged Tee PVC Ø 3" x 2" Accessories All Flanged Tee CI Ø 12" X 12" Accessories All Flanged Tee CI Ø 12" X 8" Accessories All Flanged Tee CI Ø 12" X 2" Accessories All Flanged Tee CI Ø 12" x 12" Accessories All Flanged Tee CI Ø 10" x 10" Accessories All Flanged Tee CI Ø 8" x 8" Accessories All Flanged Tee CI Ø 6" x 6" Accessories All Flanged Tee CI Ø 6" x 4" Accessories All Flanged Tee CI Ø 4" x 4" Accessories All Flanged Tee CI Ø 4" x 3" Accessories All Flanged Tee CI Ø 4" x 2" Accessories All Flanged Tee CI Ø 3" x 2" Accessories All Flanged Tee CI Ø 2" x 2" Accessories All Flanged Tee Y Cl Ø 12" X 12" Accessories Socket Tee PVC (All RR) Ø 6" x 6" Accessories Socket Tee PVC (All RR) Ø 6" x 4" Accessories Socket Tee PVC (All RR) Ø 4" x 4" Accessories Socket Tee PVC (All RR) Ø 4" x 3" Accessories Socket Tee PVC (All RR) Ø 4" x 2" Accessories Socket Tee PVC (All RR) Ø 3" X 3" Accessories Socket Tee PVC (All RR) Ø 3" X 2" Accessories Socket Tee PVC (All RR) Ø 2" X 2" Accessories Baut Moor 5/8" x 3" Accessories Baut Moor 5/8" x 4" Accessories Blind Flanged Ø 12" Accessories Blind Flanged Ø 8" Accessories Clem Besi Plat Ø 4" X 2 mm Accessories Dop PVC Ø 2" Accessories Dop PVC Ø 3" Accessories Dop PVC Ø 4" Accessories Dop PVC Ø 6"

3 m¹ m¹ m¹ Bh Bh Bh Bh Bh Bh Bh unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

4 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada

5 -

6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

7 12,500.00 10,400.00 7,900.00 715,000.00 1,372,800.00 1,960,200.00 3,630,000.00 5,544,000.00 6,652,800.00 9,196,000.00 935,000.00 550,000.00 277,200.00 154,000.00 57,600.00 3,520,000.00 4,400,000.00 5,280,000.00 6,336,000.00 7,603,200.00 269,900.00 2,640,000.00 3,564,000.00 4,488,000.00 6,336,000.00 8,448,000.00 13,200,000.00 31,680,000.00 880,000.00 473,000.00 586,850.00 522,720.00 496,584.00 3,960,000.00 3,432,000.00 2,864,400.00 4,455,000.00 2,970,000.00 1,980,000.00 1,320,000.00 1,225,400.00 1,135,200.00 786,500.00 757,900.00 605,000.00 275,000.00 3,916,000.00 1,107,900.00 1,095,300.00 416,100.00 409,300.00 404,300.00 237,600.00 231,100.00 174,800.00 8,800.00 13,200.00 891,000.00 715,000.00 49,500.00 32,560.00 58,850.00 105,600.00 130,130.00

8 12,500.00 10,400.00 7,900.00 715,000.00 1,372,800.00 1,960,200.00 3,630,000.00 5,544,000.00 6,652,800.00 9,196,000.00 935,000.00 550,000.00 277,200.00 154,000.00 57,600.00 3,520,000.00 4,400,000.00 5,280,000.00 6,336,000.00 7,603,200.00 269,900.00 2,640,000.00 3,564,000.00 4,488,000.00 6,336,000.00 8,448,000.00 13,200,000.00 31,680,000.00 880,000.00 473,000.00 586,850.00 522,720.00 496,584.00 3,960,000.00 3,432,000.00 2,864,400.00 4,455,000.00 2,970,000.00 1,980,000.00 1,320,000.00 1,225,400.00 1,135,200.00 786,500.00 757,900.00 605,000.00 275,000.00 3,916,000.00 1,107,900.00 1,095,300.00 416,100.00 409,300.00 404,300.00 237,600.00 231,100.00 174,800.00 8,800.00 13,200.00 891,000.00 715,000.00 49,500.00 32,560.00 58,850.00 105,600.00 130,130.00

9 12,500.00 10,400.00 7,900.00 715,000.00 1,372,800.00 1,960,200.00 3,630,000.00 5,544,000.00 6,652,800.00 9,196,000.00 935,000.00 550,000.00 277,200.00 154,000.00 57,600.00 3,520,000.00 4,400,000.00 5,280,000.00 6,336,000.00 7,603,200.00 269,900.00 2,640,000.00 3,564,000.00 4,488,000.00 6,336,000.00 8,448,000.00 13,200,000.00 31,680,000.00 880,000.00 473,000.00 586,850.00 522,720.00 496,584.00 3,960,000.00 3,432,000.00 2,864,400.00 4,455,000.00 2,970,000.00 1,980,000.00 1,320,000.00 1,225,400.00 1,135,200.00 786,500.00 757,900.00 605,000.00 275,000.00 3,916,000.00 1,107,900.00 1,095,300.00 416,100.00 409,300.00 404,300.00 237,600.00 231,100.00 174,800.00 8,800.00 13,200.00 891,000.00 715,000.00 49,500.00 32,560.00 58,850.00 105,600.00 130,130.00

10 12,500.00 10,400.00 7,900.00 715,000.00 1,372,800.00 1,960,200.00 3,630,000.00 5,544,000.00 6,652,800.00 9,196,000.00 935,000.00 550,000.00 277,200.00 154,000.00 57,600.00 3,520,000.00 4,400,000.00 5,280,000.00 6,336,000.00 7,603,200.00 269,900.00 2,640,000.00 3,564,000.00 4,488,000.00 6,336,000.00 8,448,000.00 13,200,000.00 31,680,000.00 880,000.00 473,000.00 586,850.00 522,720.00 496,584.00 3,960,000.00 3,432,000.00 2,864,400.00 4,455,000.00 2,970,000.00 1,980,000.00 1,320,000.00 1,225,400.00 1,135,200.00 786,500.00 757,900.00 605,000.00 275,000.00 3,916,000.00 1,107,900.00 1,095,300.00 416,100.00 409,300.00 404,300.00 237,600.00 231,100.00 174,800.00 8,800.00 13,200.00 891,000.00 715,000.00 49,500.00 32,560.00 58,850.00 105,600.00 130,130.00

12,500.00 10,400.00 7,900.00 715,000.00 1,372,800.00 1,960,200.00 3,630,000.00 5,544,000.00 6,652,800.00 9,196,000.00 935,000.00 550,000.00 277,200.00 154,000.00 57,600.00 3,520,000.00 4,400,000.00 5,280,000.00 6,336,000.00 7,603,200.00 269,900.00 2,640,000.00 3,564,000.00 4,488,000.00 6,336,000.00 8,448,000.00 13,200,000.00 31,680,000.00 880,000.00 473,000.00 586,850.00 522,720.00 496,584.00 3,960,000.00 3,432,000.00 2,864,400.00 4,455,000.00 2,970,000.00 1,980,000.00 1,320,000.00 1,225,400.00 1,135,200.00 786,500.00 757,900.00 605,000.00 275,000.00 3,916,000.00 1,107,900.00 1,095,300.00 416,100.00 409,300.00 404,300.00 237,600.00 231,100.00 174,800.00 8,800.00 13,200.00 891,000.00 715,000.00 49,500.00 32,560.00 58,850.00 105,600.00 130,130.00

11 H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata

12 Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data

13 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

1 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505

2 Accessories Double Flanged Bend CI Ø 12" X 11,25º Accessories Double Flanged Bend CI Ø 12" X 22,5º Accessories Double Flanged Bend CI Ø 12" X 45º Accessories Double Flanged Bend CI Ø 12" X 90º Accessories Double Flanged Bend CI Ø 8" x 22,5º Accessories Double Flanged Bend CI Ø 8" x 45º Accessories Double Flanged Bend CI Ø 8" x 90º Accessories Double Flanged Bend CI Ø 6" x 22,5º Accessories Double Flanged Bend CI Ø 6" x 45º Accessories Double Flanged Bend CI Ø 6" x 90º Accessories Double Flanged Bend CI Ø 4" x 11,5º Accessories Double Flanged Bend CI Ø 4" x 22,5º Accessories Double Flanged Bend CI Ø 4" x 45º Accessories Double Flanged Bend CI Ø 4" x 90º Accessories Double Flanged Bend CI Ø 3" x 22,5º Accessories Double Flanged Bend CI Ø 3" x 45º Accessories Double Flanged Bend CI Ø 3" x 90º Accessories Double Flanged Bend CI Ø 2" x 22,5º Accessories Double Flanged Bend CI Ø 2" x 45º Accessories Double Flanged Bend CI Ø 2" x 90º Accessories Double Flanged Pipe GIP Ø 3" x 60 cm. Accessories Double Flanged Pipe GIP Ø 3" x 80 cm. Accessories Double Flanged Pipe GIP Ø 3" x 100 cm. Accessories Double Flanged Pipe GIP Ø 3" x 120 cm. Accessories Double Flanged Pipe GIP Ø 3" x 200 cm. Accessories Double Flanged Pipe GIP Ø 4" x 60 cm. Accessories Double Flanged Pipe GIP Ø 4" x 80 cm. Accessories Double Flanged Pipe GIP Ø 4" x 100 cm. Accessories Double Flanged Pipe GIP Ø 4" x 120 cm. Accessories Double Flanged Pipe GIP Ø 4" x 180 cm. Accessories Flanged Pipe GIP Ø 3" x 60 cm. Accessories Flanged Pipe GIP Ø 3" x 100 cm. Accessories Flanged Pipe GIP Ø 3" x 200 cm. Accessories Flanged Pipe GIP Ø 4" x 60 cm. Accessories Flanged Pipe GIP Ø 4" x 100 cm. Accessories Flanged Pipe GIP Ø 4" x 200 cm. Accessories Flanged Pipe GIP Ø 6" x 60 cm. Accessories Flanged Pipe GIP Ø 6" x 80 cm. Accessories Flanged Pipe GIP Ø 6" x 100 cm. Accessories Flanged Pipe GIP Ø 6" x 200 cm. Accessories Double Socket Bend CI for PVC Ø 6" x 11,25º Accessories Double Socket Bend CI for PVC Ø 6" x 22,5º Accessories Double Socket Bend CI for PVC Ø 6" x 45º Accessories Double Socket Bend CI for PVC Ø 6" x 90º Accessories Flanged Air Relief Valve Ø 2" Accessories Bend Doble Socet PVC Ø 10" X 11,25º Accessories Bend Doble Socet PVC Ø 10" X 22,5º Accessories Bend Doble Socet PVC Ø 10" X 45º Accessories Bend Doble Socet PVC Ø 10" X 90º Accessories Bend Doble Socet PVC Ø 8" x 22,5º Accessories Bend Doble Socet PVC Ø 8" x 45º Accessories Bend Doble Socet PVC Ø 8" x 90º Accessories Bend Doble Socet PVC Ø 6" x 22,5º Accessories Bend Doble Socet PVC Ø 6" x 45º Accessories Bend Doble Socet PVC Ø 6" x 90º Accessories Bend Doble Socet PVC Ø 4" x 11,5º Accessories Bend Doble Socet PVC Ø 4" x 22,5º Accessories Bend Doble Socet PVC Ø 4" x 45º Accessories Bend Doble Socet PVC Ø 4" x 90º Accessories Bend Doble Socet PVC Ø 3" x 22,5º Accessories Bend Doble Socet PVC Ø 3" x 45º Accessories Bend Doble Socet PVC Ø 3" x 90º Accessories Bend Doble Socet PVC Ø 2" x 22,5º Accessories Bend Doble Socet PVC Ø 2" x 45º

3 Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

4 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada

5 -

6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

7 1,584,000.00 1,672,000.00 1,925,000.00 2,757,700.00 473,000.00 532,400.00 627,000.00 259,600.00 308,330.00 339,900.00 112,200.00 118,800.00 128,700.00 139,700.00 71,610.00 81,510.00 91,740.00 36,630.00 39,600.00 44,770.00 632,280.00 753,720.00 935,880.00 996,600.00 1,543,080.00 524,656.00 638,704.00 809,776.00 866,800.00 1,208,944.00 543,840.00 786,720.00 1,393,920.00 742,500.00 1,053,066.67 1,984,766.67 1,195,700.00 1,564,200.00 1,859,000.00 3,480,400.00 1,504,800.00 1,518,000.00 1,610,400.00 1,768,800.00 1,685,200.00 983,600.00 1,056,400.00 1,188,700.00 1,517,800.00 591,100.00 666,200.00 784,900.00 324,600.00 358,200.00 422,300.00 139,200.00 148,400.00 160,700.00 174,800.00 89,600.00 102,000.00 114,800.00 45,900.00 49,600.00

8 1,584,000.00 1,672,000.00 1,925,000.00 2,757,700.00 473,000.00 532,400.00 627,000.00 259,600.00 308,330.00 339,900.00 112,200.00 118,800.00 128,700.00 139,700.00 71,610.00 81,510.00 91,740.00 36,630.00 39,600.00 44,770.00 632,280.00 753,720.00 935,880.00 996,600.00 1,543,080.00 524,656.00 638,704.00 809,776.00 866,800.00 1,208,944.00 543,840.00 786,720.00 1,393,920.00 742,500.00 1,053,066.67 1,984,766.67 1,195,700.00 1,564,200.00 1,859,000.00 3,480,400.00 1,504,800.00 1,518,000.00 1,610,400.00 1,768,800.00 1,685,200.00 983,600.00 1,056,400.00 1,188,700.00 1,517,800.00 591,100.00 666,200.00 784,900.00 324,600.00 358,200.00 422,300.00 139,200.00 148,400.00 160,700.00 174,800.00 89,600.00 102,000.00 114,800.00 45,900.00 49,600.00

9 1,584,000.00 1,672,000.00 1,925,000.00 2,757,700.00 473,000.00 532,400.00 627,000.00 259,600.00 308,330.00 339,900.00 112,200.00 118,800.00 128,700.00 139,700.00 71,610.00 81,510.00 91,740.00 36,630.00 39,600.00 44,770.00 632,280.00 753,720.00 935,880.00 996,600.00 1,543,080.00 524,656.00 638,704.00 809,776.00 866,800.00 1,208,944.00 543,840.00 786,720.00 1,393,920.00 742,500.00 1,053,066.67 1,984,766.67 1,195,700.00 1,564,200.00 1,859,000.00 3,480,400.00 1,504,800.00 1,518,000.00 1,610,400.00 1,768,800.00 1,685,200.00 983,600.00 1,056,400.00 1,188,700.00 1,517,800.00 591,100.00 666,200.00 784,900.00 324,600.00 358,200.00 422,300.00 139,200.00 148,400.00 160,700.00 174,800.00 89,600.00 102,000.00 114,800.00 45,900.00 49,600.00

10 1,584,000.00 1,672,000.00 1,925,000.00 2,757,700.00 473,000.00 532,400.00 627,000.00 259,600.00 308,330.00 339,900.00 112,200.00 118,800.00 128,700.00 139,700.00 71,610.00 81,510.00 91,740.00 36,630.00 39,600.00 44,770.00 632,280.00 753,720.00 935,880.00 996,600.00 1,543,080.00 524,656.00 638,704.00 809,776.00 866,800.00 1,208,944.00 543,840.00 786,720.00 1,393,920.00 742,500.00 1,053,066.67 1,984,766.67 1,195,700.00 1,564,200.00 1,859,000.00 3,480,400.00 1,504,800.00 1,518,000.00 1,610,400.00 1,768,800.00 1,685,200.00 983,600.00 1,056,400.00 1,188,700.00 1,517,800.00 591,100.00 666,200.00 784,900.00 324,600.00 358,200.00 422,300.00 139,200.00 148,400.00 160,700.00 174,800.00 89,600.00 102,000.00 114,800.00 45,900.00 49,600.00

1,584,000.00 1,672,000.00 1,925,000.00 2,757,700.00 473,000.00 532,400.00 627,000.00 259,600.00 308,330.00 339,900.00 112,200.00 118,800.00 128,700.00 139,700.00 71,610.00 81,510.00 91,740.00 36,630.00 39,600.00 44,770.00 632,280.00 753,720.00 935,880.00 996,600.00 1,543,080.00 524,656.00 638,704.00 809,776.00 866,800.00 1,208,944.00 543,840.00 786,720.00 1,393,920.00 742,500.00 1,053,066.67 1,984,766.67 1,195,700.00 1,564,200.00 1,859,000.00 3,480,400.00 1,504,800.00 1,518,000.00 1,610,400.00 1,768,800.00 1,685,200.00 983,600.00 1,056,400.00 1,188,700.00 1,517,800.00 591,100.00 666,200.00 784,900.00 324,600.00 358,200.00 422,300.00 139,200.00 148,400.00 160,700.00 174,800.00 89,600.00 102,000.00 114,800.00 45,900.00 49,600.00

11 H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata

12 Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data

13 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

1 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569

2 Accessories Bend Doble Socet PVC Ø 2" x 90º Accessories Flanged Socket PVC RRJ Ø 2" Accessories Flanged Socket PVC RRJ Ø 3" Accessories Flanged Socket PVC RRJ Ø 4" Accessories Flanged Socket PVC RRJ Ø 6" Accessories Flanged Socket PVC RRJ Ø 8" Accessories Flanged Socket PVC RRJ Ø 10" Accessories Flanged Socket PVC RRJ Ø 12" Accessories Flanged Spigot PVC Ø 2" Accessories Flanged Spigot PVC Ø 3" Accessories Flanged Spigot PVC Ø 4" Accessories Flanged Spigot PVC Ø 6" Accessories Flanged Spigot PVC Ø 8" Accessories Flanged Spigot PVC Ø 12" Accessories Flanged Steel PN 10 Ø 2" Accessories Flanged Steel PN 10 Ø 3" Accessories Flanged Steel PN 10 Ø 4" Accessories Flanged Steel PN 10 Ø 6" Accessories Flanged Steel PN 10 Ø 8" Accessories Flanged Steel PN 10 Ø 10" Accessories Flanged Steel PN 10 Ø 12" Accessories Flanged Strainer CI Ø 3" Accessories Flanged Strainer CI Ø 4" Accessories Flanged Strainer CI Ø 6" Accessories Flanged Strainer CI Ø 8" Accessories Fleksible Joint "Tosen" Ø 4 Accessories Fleksible Joint "Tosen" Ø 6 Accessories Fleksible Joint "Tosen" Ø 8 Accessories Fleksible Joint "Tosen" Ø 10 Accessories Fleksible Joint "Tosen" Ø 12 Accessories Manhole 80 x 80 Cm. Accessories Paking Karet Ø 2" Accessories Paking Karet Ø 3" Accessories Paking Karet Ø 4" Accessories Paking Karet Ø 6" Accessories Paking Karet Ø 8" Accessories Paking Karet Ø 10" Accessories Paking Karet Ø 12" Accessories DF Pipa GIP Ø 3" x 60 cm. Accessories DF Pipa GIP Ø 3" x 100 cm. Accessories Pressure Reducing Valve Ø 6" Accessories Repair Socket PVC Ø 2" Accessories Socket Repair PVC Ø 6" Accessories Rubber Expansiont Joint Ø 6" Accessories Rubber Water Stop 30 Cm Accessories Socket GIP Ø 2" Accessories Socket GIP Ø 3" Accessories Socket GIP Ø 4" Accessories Socket GIP Ø 6" Accessories Socket Reducer PVC (All RR) Ø 3" x 2" Accessories Socket Reducer PVC (All RR) Ø 4" x 3" Accessories Socket Reducer PVC (All RR) Ø 4" x 2" Accessories Socket Reducer PVC (All RR) Ø 6" x 3" Accessories Socket Reducer PVC (All RR) Ø 6" x 4" Accessories Socket Reducer PVC (All RR) Ø 8" x 6" Accessories Socket Reducer PVC (All RR) Ø 10" x 8" Accessories Socket Spigot Bend PVC Ø 12" X 90º Accessories Socket Spigot Bend PVC Ø 12" X 45º Accessories Socket Spigot Bend PVC Ø 12" X 22,5º Accessories Socket Spigot Bend PVC Ø 12" X 11,25º Accessories Socket Spigot Bend PVC Ø 8" x 22,5º Accessories Socket Spigot Bend PVC Ø 8" x 45º Accessories Socket Spigot Bend PVC Ø 8" x 90º Accessories Socket Spigot Bend PVC Ø 6" x 22,5º

3 Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh unit Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

4 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada

5 -

6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

7 56,000.00 177,900.00 245,000.00 323,100.00 596,000.00 960,200.00 985,000.00 1,499,400.00 139,370.00 192,940.00 244,640.00 479,820.00 747,120.00 1,108,030.00 89,100.00 118,800.00 165,000.00 237,600.00 316,800.00 380,160.00 475,200.00 1,265,000.00 1,650,000.00 2,040,500.00 2,310,000.00 1,425,600.00 1,782,000.00 2,138,400.00 2,566,080.00 3,079,296.00 495,000.00 26,620.00 31,460.00 47,190.00 66,000.00 104,500.00 123,750.00 143,000.00 455,400.00 667,920.00 66,000,000.00 104,500.00 550,000.00 1,914,000.00 429,000.00 55,000.00 77,000.00 92,400.00 253,000.00 77,600.00 131,600.00 117,300.00 202,800.00 232,800.00 523,200.00 799,100.00 3,880,800.00 3,484,800.00 2,822,160.00 2,376,000.00 982,423.20 1,150,274.40 1,323,062.40 525,360.00

8 56,000.00 177,900.00 245,000.00 323,100.00 596,000.00 960,200.00 985,000.00 1,499,400.00 139,370.00 192,940.00 244,640.00 479,820.00 747,120.00 1,108,030.00 89,100.00 118,800.00 165,000.00 237,600.00 316,800.00 380,160.00 475,200.00 1,265,000.00 1,650,000.00 2,040,500.00 2,310,000.00 1,425,600.00 1,782,000.00 2,138,400.00 2,566,080.00 3,079,296.00 495,000.00 26,620.00 31,460.00 47,190.00 66,000.00 104,500.00 123,750.00 143,000.00 455,400.00 667,920.00 66,000,000.00 104,500.00 550,000.00 1,914,000.00 429,000.00 55,000.00 77,000.00 92,400.00 253,000.00 77,600.00 131,600.00 117,300.00 202,800.00 232,800.00 523,200.00 799,100.00 3,880,800.00 3,484,800.00 2,822,160.00 2,376,000.00 982,423.20 1,150,274.40 1,323,062.40 525,360.00

9 56,000.00 177,900.00 245,000.00 323,100.00 596,000.00 960,200.00 985,000.00 1,499,400.00 139,370.00 192,940.00 244,640.00 479,820.00 747,120.00 1,108,030.00 89,100.00 118,800.00 165,000.00 237,600.00 316,800.00 380,160.00 475,200.00 1,265,000.00 1,650,000.00 2,040,500.00 2,310,000.00 1,425,600.00 1,782,000.00 2,138,400.00 2,566,080.00 3,079,296.00 495,000.00 26,620.00 31,460.00 47,190.00 66,000.00 104,500.00 123,750.00 143,000.00 455,400.00 667,920.00 66,000,000.00 104,500.00 550,000.00 1,914,000.00 429,000.00 55,000.00 77,000.00 92,400.00 253,000.00 77,600.00 131,600.00 117,300.00 202,800.00 232,800.00 523,200.00 799,100.00 3,880,800.00 3,484,800.00 2,822,160.00 2,376,000.00 982,423.20 1,150,274.40 1,323,062.40 525,360.00

10 56,000.00 177,900.00 245,000.00 323,100.00 596,000.00 960,200.00 985,000.00 1,499,400.00 139,370.00 192,940.00 244,640.00 479,820.00 747,120.00 1,108,030.00 89,100.00 118,800.00 165,000.00 237,600.00 316,800.00 380,160.00 475,200.00 1,265,000.00 1,650,000.00 2,040,500.00 2,310,000.00 1,425,600.00 1,782,000.00 2,138,400.00 2,566,080.00 3,079,296.00 495,000.00 26,620.00 31,460.00 47,190.00 66,000.00 104,500.00 123,750.00 143,000.00 455,400.00 667,920.00 66,000,000.00 104,500.00 550,000.00 1,914,000.00 429,000.00 55,000.00 77,000.00 92,400.00 253,000.00 77,600.00 131,600.00 117,300.00 202,800.00 232,800.00 523,200.00 799,100.00 3,880,800.00 3,484,800.00 2,822,160.00 2,376,000.00 982,423.20 1,150,274.40 1,323,062.40 525,360.00

56,000.00 177,900.00 245,000.00 323,100.00 596,000.00 960,200.00 985,000.00 1,499,400.00 139,370.00 192,940.00 244,640.00 479,820.00 747,120.00 1,108,030.00 89,100.00 118,800.00 165,000.00 237,600.00 316,800.00 380,160.00 475,200.00 1,265,000.00 1,650,000.00 2,040,500.00 2,310,000.00 1,425,600.00 1,782,000.00 2,138,400.00 2,566,080.00 3,079,296.00 495,000.00 26,620.00 31,460.00 47,190.00 66,000.00 104,500.00 123,750.00 143,000.00 455,400.00 667,920.00 66,000,000.00 104,500.00 550,000.00 1,914,000.00 429,000.00 55,000.00 77,000.00 92,400.00 253,000.00 77,600.00 131,600.00 117,300.00 202,800.00 232,800.00 523,200.00 799,100.00 3,880,800.00 3,484,800.00 2,822,160.00 2,376,000.00 982,423.20 1,150,274.40 1,323,062.40 525,360.00

11 H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata

12 Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data

13 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

1 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633

2 Accessories Socket Spigot Bend PVC Ø 6" x 45º Accessories Socket Spigot Bend PVC Ø 6" x 90º Accessories Socket Spigot Bend PVC (S-10) Ø 4" x 22,5º Accessories Socket Spigot Bend PVC (S-10) Ø 4" x 45º Accessories Socket Spigot Bend PVC (S-10) Ø 4" x 90º Accessories Socket Spigot Bend PVC ( S-10) Ø 3" x 90º Accessories Socket Spigot Bend PVC ( S-10) Ø 3" x 45º Accessories Socket Spigot Bend PVC ( S-10) Ø 3" x 22,5º Accessories Socket Spigot Bend PVC ( S-10) Ø 2" x 90º Accessories Socket Spigot Bend PVC ( S-10) Ø 2" x 45º Accessories Socket Spigot Bend PVC ( S-10) Ø 2" x 22,5º Accessories Tangki Fiberglass 2 m³ Accessories Tutup Manhole 0,80 x 0,80 Accessories Tutup Manhole 1 x 0,80 Accessories Socket Reducer HDPE Ø 10" x 8" Accessories Socket Reducer HDPE Ø 8" x 6" Accessories Socket Reducer HDPE Ø 6" x 4" Accessories Socket Reducer HDPE Ø 4" x 3" Accessories Socket Reducer HDPE Ø 3" x 2" Accessories Elbow With Thread HDPE Ø 10" x 90º Accessories Elbow With Thread HDPE Ø 8" x 90º Accessories Elbow With Thread HDPE Ø 6" x 90º Accessories Elbow With Thread HDPE Ø 4" x 90º Accessories Elbow With Thread HDPE Ø 3" x 90º Accessories Elbow With Thread HDPE Ø 2" x 90º Accessories Elbow Pushon Sistem Male HDPE Ø 1" x 90º Accessories Elbow Pushon Sistem Male HDPE Ø 3/4" x 90º Accessories Elbow Pushon Sistem Male HDPE Ø 1/2" x 90º x 25 Accessories Elbow Pushon Sistem Male HDPE Ø 1" x 90º x 20 Accessories Elbow Pushon Sistem Female HDPE Ø 3/4" x 90º x 25 Accessories Elbow Pushon Sistem Female HDPE Ø 1/2" x 90º x 20 Accessories Fitting Compression Push Fit Accessories Tee HDPE 90º Ø 10" Accessories Tee HDPE 90º Ø 8" Accessories Tee HDPE 90º Ø 6" Accessories Tee HDPE 90º Ø 4" Accessories Tee HDPE 90º Ø 3" Accessories Tee HDPE 90º Ø 2" Accessories Bend HDPE 90º Ø 12" Accessories Bend HDPE 90º Ø 8" Accessories Bend HDPE 90º Ø 6" Accessories Bend HDPE 90º Ø 4" Accessories Bend HDPE 90º Ø 3" Accessories Bend HDPE 90º Ø 2" Accessories Bend HDPE 45º Ø 10" Accessories Bend HDPE 45º Ø 8" Accessories Bend HDPE 45º Ø 6" Accessories Bend HDPE 45º Ø 4" Accessories Bend HDPE 45º Ø 3" Accessories Bend HDPE 45º Ø 2" Accessories Stub End HDPE Ø 10" Accessories Stub End HDPE Ø 8" Accessories Stub End HDPE Ø 6" Accessories Stub End HDPE Ø 4" Accessories Stub End HDPE Ø 3" Accessories Stub End HDPE Ø 2" Accessories Flange HDPE Ø 12" Accessories Flange HDPE Ø 8" Accessories Flange HDPE Ø 6" Accessories Flange HDPE Ø 4" Accessories Flange HDPE Ø 3" Accessories Flange HDPE Ø 2" Accessories Cap/Dop HDPE Ø 8" Accessories Cap/Dop HDPE Ø 6"

3 Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh unit unit unit Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

4 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada

5 -

6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

7 615,120.00 707,520.00 241,560.00 260,040.00 289,080.00 231,000.00 204,600.00 180,840.00 136,950.00 125,796.00 112,200.00 4,400,000.00 495,000.00 935,000.00 990,200.00 527,000.00 361,300.00 135,800.00 102,600.00 1,482,900.00 931,400.00 764,000.00 375,900.00 305,900.00 183,000.00 49,400.00 36,800.00 29,400.00 27,200.00 23,600.00 20,000.00 20,000.00 1,199,300.00 833,400.00 653,600.00 424,800.00 362,900.00 263,400.00 1,710,720.00 829,950.00 680,680.00 334,950.00 272,580.00 163,020.00 1,146,420.00 645,260.00 521,400.00 272,250.00 189,310.00 112,090.00 1,088,600.00 744,800.00 475,300.00 269,600.00 218,100.00 149,300.00 2,444,475.00 901,395.00 565,290.00 366,685.00 239,910.00 146,685.00 374,385.00 191,510.00

8 615,120.00 707,520.00 241,560.00 260,040.00 289,080.00 231,000.00 204,600.00 180,840.00 136,950.00 125,796.00 112,200.00 4,400,000.00 495,000.00 935,000.00 990,200.00 527,000.00 361,300.00 135,800.00 102,600.00 1,482,900.00 931,400.00 764,000.00 375,900.00 305,900.00 183,000.00 49,400.00 36,800.00 29,400.00 27,200.00 23,600.00 20,000.00 20,000.00 1,199,300.00 833,400.00 653,600.00 424,800.00 362,900.00 263,400.00 1,710,720.00 829,950.00 680,680.00 334,950.00 272,580.00 163,020.00 1,146,420.00 645,260.00 521,400.00 272,250.00 189,310.00 112,090.00 1,088,600.00 744,800.00 475,300.00 269,600.00 218,100.00 149,300.00 2,444,475.00 901,395.00 565,290.00 366,685.00 239,910.00 146,685.00 374,385.00 191,510.00

9 615,120.00 707,520.00 241,560.00 260,040.00 289,080.00 231,000.00 204,600.00 180,840.00 136,950.00 125,796.00 112,200.00 4,400,000.00 495,000.00 935,000.00 990,200.00 527,000.00 361,300.00 135,800.00 102,600.00 1,482,900.00 931,400.00 764,000.00 375,900.00 305,900.00 183,000.00 49,400.00 36,800.00 29,400.00 27,200.00 23,600.00 20,000.00 20,000.00 1,199,300.00 833,400.00 653,600.00 424,800.00 362,900.00 263,400.00 1,710,720.00 829,950.00 680,680.00 334,950.00 272,580.00 163,020.00 1,146,420.00 645,260.00 521,400.00 272,250.00 189,310.00 112,090.00 1,088,600.00 744,800.00 475,300.00 269,600.00 218,100.00 149,300.00 2,444,475.00 901,395.00 565,290.00 366,685.00 239,910.00 146,685.00 374,385.00 191,510.00

10 615,120.00 707,520.00 241,560.00 260,040.00 289,080.00 231,000.00 204,600.00 180,840.00 136,950.00 125,796.00 112,200.00 4,400,000.00 495,000.00 935,000.00 990,200.00 527,000.00 361,300.00 135,800.00 102,600.00 1,482,900.00 931,400.00 764,000.00 375,900.00 305,900.00 183,000.00 49,400.00 36,800.00 29,400.00 27,200.00 23,600.00 20,000.00 20,000.00 1,199,300.00 833,400.00 653,600.00 424,800.00 362,900.00 263,400.00 1,710,720.00 829,950.00 680,680.00 334,950.00 272,580.00 163,020.00 1,146,420.00 645,260.00 521,400.00 272,250.00 189,310.00 112,090.00 1,088,600.00 744,800.00 475,300.00 269,600.00 218,100.00 149,300.00 2,444,475.00 901,395.00 565,290.00 366,685.00 239,910.00 146,685.00 374,385.00 191,510.00

615,120.00 707,520.00 241,560.00 260,040.00 289,080.00 231,000.00 204,600.00 180,840.00 136,950.00 125,796.00 112,200.00 4,400,000.00 495,000.00 935,000.00 990,200.00 527,000.00 361,300.00 135,800.00 102,600.00 1,482,900.00 931,400.00 764,000.00 375,900.00 305,900.00 183,000.00 49,400.00 36,800.00 29,400.00 27,200.00 23,600.00 20,000.00 20,000.00 1,199,300.00 833,400.00 653,600.00 424,800.00 362,900.00 263,400.00 1,710,720.00 829,950.00 680,680.00 334,950.00 272,580.00 163,020.00 1,146,420.00 645,260.00 521,400.00 272,250.00 189,310.00 112,090.00 1,088,600.00 744,800.00 475,300.00 269,600.00 218,100.00 149,300.00 2,444,475.00 901,395.00 565,290.00 366,685.00 239,910.00 146,685.00 374,385.00 191,510.00

11 H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata

12 Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data

13 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

1 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697

2 Accessories Cap/Dop HDPE Ø 4" Accessories Cap/Dop HDPE Ø 3" Accessories Cap/Dop HDPE Ø 2" Accessories Cap/Dop HDPE Ø 1" Accessories Cap/Dop HDPE Ø 3/4" Accessories Cap/Dop HDPE Ø 1/2" Accessories Clamp Saddle 6" (160 mm) Accessories Clamp Saddle 4" (110 mm) Accessories Clamp Saddle 3" (90 mm) Accessories Clamp Saddle 2" (63 mm) Accessories Clamp Saddle 1½" (50 mm) Accessories Male thread adaptor (MTA) 1" (32 mm) Accessories Male thread adaptor (MTA) 3/4" (25 mm) Accessories Male thread adaptor (MTA) 1/2" (20 mm) Accessories Tap Kran Accessories Box Merer Cover Pompa Air Listrik; Suction 9 m; Head 40 m; kap. 35 l/min Pompa Centrifugal; Head 100 m; kap. 11 l/dt Pompa Tangan Dragon Profil Tank Fiberglass orange kap. 1100 ltr. Profil Tank Fiberglass orange kap. 650 ltr. Shower Screen Fiber Shower Screen Kaca Stop Kran 1" Stop Kran 1/2" Stop Kran 2" Stop Kran 3/4" Submersible Deep Well Pump; Head 100 m; kap.1 HP Submersible Deep Well Pump; Head 70 m; kap.2 HP Urinoir Keramik Standar Wastafel Gantung Keramik Box MCB Down Light Warna 3" Setara Phillips Down Light Warna 4" Setara Phillips Down Light Warna 5" Setara Phillips Down Light Warna 6" Setara Phillips Exhaust Fetting Genset 1300 W Genset 2000 W Genset 2500 W Genset 5000 W Genset 6000 W Genset 900 W Kabel Ravo 2x1,5 mm2 Kabel Ravo 2x2,5 mm2 Lampu Downlight 4' Lampu Neon SL 15 Watt Setara Phillips Lampu Neon SL 18 Watt Setara Phillips Lampu Pijar 100 Watt Setara Phillips Lampu Pijar 25 Watt Setara Phillips Lampu Pijar 40 Watt Setara Phillips Lampu Pijar 60 Watt Setara Phillips Lampu TL (Neon) 10 Watt (komplet) Setara Phillips Lampu TL (Neon) 20 Watt (komplet) Setara Phillips Lampu TL (Neon) 40 Watt (komplet) Setara Phillips Main Distribusi Panel (PDM) Saklar Ganda Saklar Stopkontak Saklar Tunggal Sekring Automatik Stop Kontak Alumunium foil Carpet

la la la la la la la la la la la la la la la ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll ll lt lt

3 Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Unit Unit Unit Bh Bh Bh Bh Bh Bh Bh Bh Unit Unit Bh Bh Unit Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh M¹ M¹ Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Unit Bh Bh Bh Bh Bh M² M²

4 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 550,000.00 Tidak Ada Tidak Ada 1,250,000.00 850,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 5,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 15,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 8,000.00 10,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 17,000.00 20,000.00 12,500.00 Tidak Ada 15,000.00 Tidak Ada Tidak Ada

5 2 3 6 4 3 2 2 2 3 2 3 -

6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 4 2 13 14 5 3 2 2 2 2 3 3 3 4 8 2 2 2 1 3 7 5 4 3 4 4 4 9 9 3 1 2 0 0 0 0 0 1 1 3 14 14 13 3 11 3 2

7 79,475.00 27,170.00 18,095.00 17,160.00 13,860.00 9,570.00 172,100.00 103,600.00 93,200.00 57,600.00 45,300.00 44,990.00 34,650.00 28,050.00 18,000.00 40,000.00 140,000.00 2,013,000.00 0.00 1,100,000.00 445,000.00 50,000.00 250,000.00 0.00 0.00 0.00 0.00 1,625,000.00 2,280,000.00 1,350,000.00 350,000.00 4,000.00 31,000.00 47,000.00 68,000.00 575,000.00 350,000.00 12,000.00 15,000.00 4,450,000.00 4,700,000.00 8,275,000.00 9,100,000.00 2,070,000.00 7,000.00 9,000.00 43,000.00 30,000.00 19,500.00 0.00 0.00 0.00 0.00 0.00 79,000.00 96,000.00 17,500.00 6,300.00 6,300.00 5,000.00 9,800.00 13,000.00 28,000.00 0.00

8 79,475.00 27,170.00 18,095.00 17,160.00 13,860.00 9,570.00 172,100.00 103,600.00 93,200.00 57,600.00 45,300.00 44,990.00 34,650.00 28,050.00 18,000.00 40,000.00 965,000.00 3,150,000.00 0.00 1,600,000.00 1,100,000.00 158,000.00 250,000.00 0.00 0.00 0.00 0.00 1,625,000.00 2,280,000.00 1,350,000.00 650,000.00 10,000.00 114,000.00 189,000.00 297,000.00 575,000.00 350,000.00 15,000.00 3,100,000.00 5,950,000.00 4,700,000.00 12,850,000.00 16,927,000.00 2,375,000.00 325,000.00 445,000.00 43,000.00 30,000.00 21,000.00 0.00 0.00 0.00 0.00 0.00 79,000.00 96,000.00 17,500.00 25,000.00 25,000.00 25,000.00 9,800.00 25,000.00 28,000.00 0.00

9 79,475.00 27,170.00 18,095.00 17,160.00 13,860.00 9,570.00 172,100.00 103,600.00 93,200.00 57,600.00 45,300.00 44,990.00 34,650.00 28,050.00 18,000.00 40,000.00 544,444.44 2,581,500.00 Tdk Ada Data 1,299,090.91 877,083.33 94,333.33 250,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 1,625,000.00 2,280,000.00 1,350,000.00 500,000.00 5,666.67 72,500.00 118,000.00 182,500.00 575,000.00 350,000.00 13,900.00 1,488,333.33 5,200,000.00 4,700,000.00 10,562,500.00 13,013,500.00 2,222,500.00 93,971.43 128,471.43 43,000.00 30,000.00 20,250.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 79,000.00 96,000.00 17,500.00 17,691.67 17,775.00 13,500.00 9,800.00 17,555.56 28,000.00 Tdk Ada Data

10 79,475.00 27,170.00 18,095.00 17,160.00 13,860.00 9,570.00 172,100.00 103,600.00 93,200.00 57,600.00 45,300.00 44,990.00 34,650.00 28,050.00 18,000.00 40,000.00 550,000.00 2,581,500.00 Tdk Ada Data 1,250,000.00 850,000.00 94,333.33 250,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 1,625,000.00 2,280,000.00 1,350,000.00 500,000.00 5,000.00 72,500.00 118,000.00 182,500.00 575,000.00 350,000.00 15,000.00 1,488,333.33 5,200,000.00 4,700,000.00 10,562,500.00 13,013,500.00 2,222,500.00 8,000.00 10,000.00 43,000.00 30,000.00 20,250.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 79,000.00 96,000.00 17,500.00 17,000.00 20,000.00 12,500.00 9,800.00 15,000.00 28,000.00 Tdk Ada Data

79,475.00 27,170.00 18,095.00 17,160.00 13,860.00 9,570.00 172,100.00 103,600.00 93,200.00 57,600.00 45,300.00 44,990.00 34,650.00 28,050.00 18,000.00 40,000.00 550,000.00 12,705,000.00 324,845.00 1,732,500.00 1,129,018.00 2,887,500.00 4,042,500.00 88,595.00 41,345.00 183,275.00 70,875.00 6,063,750.00 4,620,000.00 1,583,505.00 638,110.00 40,425.00 41,151.00 118,000.00 182,500.00 575,000.00 404,250.00 8,865.00 1,848,000.00 2,310,000.00 3,349,500.00 6,930,000.00 7,507,500.00 1,039,500.00 8,000.00 10,000.00 69,300.00 34,650.00 37,543.00 37,500.00 27,500.00 33,750.00 65,000.00 51,975.00 86,625.00 101,068.00 3,250.00 17,000.00 28,875.00 17,325.00 28,875.00 17,325.00 57,750.00 76,780.00

11 H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Dominan Penyesuaian 0.00 Penyesuaian Penyesuaian Penyesuaian Penyesuaian 0.00 0.00 0.00 0.00 Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian H-Rata rata H-Rata rata H-Rata rata Penyesuaian 0.00 Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian H-Dominan H-Dominan Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian 0.00 H-Dominan Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian 0.00

12 Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data 14% 9% 11% 9% 9% 9% 9% 11% 11% 11% 11% 9% 9% 9% 9% 9% Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data 9% 11% 9% 9% 9% 9% 9% 9% 2% 11% 9% Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data 11% -24% 9% 9% 9% 9% 9% 11%

13 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 77,500.00 1,155,000.00 36,095.00 157,500.00 102,638.00 262,500.00 367,500.00 9,845.00 4,595.00 20,365.00 7,875.00 551,250.00 420,000.00 143,955.00 58,010.00 3,675.00 #VALUE! #VALUE! #VALUE! #VALUE! 36,750.00 985.00 168,000.00 210,000.00 304,500.00 630,000.00 682,500.00 94,500.00 120.00 1,070.00 6,300.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 360.00 -4,000.00 2,625.00 1,575.00 2,625.00 1,575.00 5,250.00 8,530.00

1 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761

2 Carpet 80% wool, 20% nylon Feltex carpet 100% wool T-21 Floor hardener Gymfloor Lem vinyil Lt vinyl karet 30x30 kwl II Lt vinyl karet 30x30 kwl l Parquet jati Underlyer tebal 6 mm/rubber corrugated Vinyil Vinyil asbes Vinyil motif kembang Ex DN Vinyil wall covering lebar 50 cm Wallpaper Jendela besi Jendela besi tahan api Kaca Buram 12 mm Kaca Buram 5 mm Kaca cermin tebal 5 mm Kaca cermin tebal 8 mm Kaca patri Kaca Polos 3 mm Kaca Polos 5 mm Kaca Polos 8 mm Kaca Ray-Band 5 mm Kaca wireglass Kawat burung Kawat Harmonika Kawat Nyamuk/Kasa Logam Kawat Nyamuk/Kasa Plastik Naco (Kerangka dan Daun) Pintu besi baja Pintu lipat Plastik Filter Sunscreen alumunium Door closer Door holder Door Stop Engsel (setara solid) 3" Engsel (setara solid) 4" Engsel Biasa 2 1/2" Engsel Biasa 3" Engsel Lokal Besar Engsel Nylon Arch 3" Espagnolet Formica Grendel (setara solid) Grendel Lokal Besar Hak Angin Biasa Kait angin Kosen + Pintu PVC Kunci lemari Kunci Pintu Master (setara solid) Kunci Selot Kunci Silinder Putar Kunci Tanam 2 Slag Kunci Tanam 3 Slag Kunci Tanam Biasa Pegangan pintu biasa Pintu alumunium Rol pintu dorong Sealent Tarikan Pintu (setara solid) 10" Tarikan Pintu (setara solid) 15"

lt lt lt lt lt lt lt lt lt lt lt lt lt lt pj pj pj pj pj pj pj pj pj pj pj pj pj pj pj pj pj pj pj pj pj pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja pja

3 M² M² Kg M² Kg M² M² M² M² Lbr Bh Bh M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² Bh Bh Bh Bh Bh Bh Bh Bh Bh Set Lbr Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh M² Bh Kg Psg Psg

4 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 150,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 20,000.00 25,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 15,000.00 20,000.00 10,000.00 10,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada 5,000.00 10,000.00 5,000.00 3,000.00 250,000.00 15,000.00 Tidak Ada 6,000.00 30,000.00 30,000.00 Tidak Ada Tidak Ada Tidak Ada 300,000.00 Tidak Ada 27,500.00 150,000.00 Tidak Ada

5 2 2 3 4 3 2 4 2 2 5 2 3 6 2 2 2 3 2 2 -

6 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 2 2 4 4 3 4 2 5 4 7 9 2 2 2 2 2 3 2 4 13 12 10 13 5 3 4 2 12 10 15 7 12 17 9 13 9 12 2 6 10 9 2 5 10 7

7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300,000.00 0.00 0.00 115,000.00 150,000.00 450,000.00 150,000.00 0.00 20,000.00 25,000.00 20,000.00 10,000.00 0.00 0.00 0.00 0.00 0.00 150,000.00 0.00 27,500.00 5,000.00 7,000.00 6,500.00 6,000.00 20,000.00 8,000.00 25,000.00 0.00 5,000.00 3,000.00 2,000.00 3,000.00 225,000.00 5,000.00 30,000.00 5,000.00 22,000.00 30,000.00 0.00 15,000.00 3,500.00 300,000.00 0.00 27,500.00 60,000.00 75,000.00

8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300,000.00 0.00 0.00 135,000.00 150,000.00 450,000.00 170,000.00 0.00 110,000.00 450,000.00 25,000.00 25,000.00 0.00 0.00 0.00 0.00 0.00 150,000.00 0.00 55,000.00 150,000.00 96,000.00 22,500.00 19,000.00 39,500.00 8,000.00 125,000.00 0.00 49,500.00 56,000.00 21,000.00 15,000.00 300,000.00 45,000.00 150,000.00 35,000.00 73,000.00 185,000.00 0.00 77,000.00 160,000.00 925,000.00 0.00 30,000.00 221,000.00 286,000.00

9 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 300,000.00 Tdk Ada Data Tdk Ada Data 125,000.00 150,000.00 450,000.00 160,000.00 Tdk Ada Data 50,833.33 237,500.00 22,500.00 20,357.14 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 150,000.00 Tdk Ada Data 41,250.00 31,109.09 29,030.00 11,625.00 10,972.73 31,833.33 8,000.00 75,000.00 Tdk Ada Data 15,750.00 21,250.00 7,538.46 7,000.00 248,500.00 15,800.00 101,000.00 18,045.45 45,000.00 99,000.00 Tdk Ada Data 46,750.00 58,000.00 407,142.86 Tdk Ada Data 28,333.33 132,550.00 159,400.00

10 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 300,000.00 Tdk Ada Data Tdk Ada Data 125,000.00 150,000.00 450,000.00 160,000.00 Tdk Ada Data 50,833.33 237,500.00 20,000.00 25,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 150,000.00 Tdk Ada Data 41,250.00 15,000.00 20,000.00 10,000.00 10,000.00 31,833.33 8,000.00 75,000.00 Tdk Ada Data 5,000.00 10,000.00 5,000.00 3,000.00 250,000.00 15,000.00 101,000.00 6,000.00 30,000.00 30,000.00 Tdk Ada Data 46,750.00 58,000.00 300,000.00 Tdk Ada Data 27,500.00 150,000.00 159,400.00

94,500.00 194,905.00 32,490.00 340,000.00 32,490.00 100,405.00 94,500.00 350,000.00 200,815.00 32,490.00 14,770.00 20,680.00 118,125.00 135,845.00 885,940.00 1,063,125.00 354,375.00 206,720.00 189,000.00 236,250.00 354,375.00 125,000.00 179,025.00 189,000.00 184,800.00 177,190.00 20,680.00 36,910.00 20,000.00 17,720.00 472,500.00 413,440.00 885,940.00 11,815.00 147,655.00 866,250.00 295,315.00 57,750.00 23,100.00 40,425.00 8,865.00 11,550.00 31,833.33 14,058.00 173,250.00 82,690.00 25,993.00 20,218.00 5,775.00 20,218.00 404,250.00 28,875.00 259,875.00 34,650.00 86,625.00 167,475.00 236,250.00 86,625.00 58,000.00 300,000.00 94,500.00 97,020.00 150,000.00 288,750.00

11

12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

H-Rata rata Penyesuaian 0.00 Penyesuaian 0.00 0.00 0.00 H-Dominan 0.00 0.00 0.00 0.00 0.00 0.00 Penyesuaian 0.00 Penyesuaian Penyesuaian Penyesuaian 0.00 Penyesuaian H-Rata rata Penyesuaian Penyesuaian 0.00 Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian Penyesuaian 0.00 Penyesuaian H-Rata rata H-Dominan 0.00 Penyesuaian H-Dominan Penyesuaian

11% 11% 11% 63% 11% 11% 11% 46% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 16% 9% 11% 9% 11% 11% 11% 2% 11% 11% 11% 11% 11% 11% 9% 11% 9% 9% 9% 11% 9% 18% 9% 9% 11% 9% 9% 9% 9% 9% 9% 9% 9% 9% 9% 11% 9% 9% 4% 11% 9% 20% 9%

13 10,500.00 21,655.00 3,610.00 214,000.00 3,610.00 11,155.00 10,500.00 161,000.00 22,315.00 3,610.00 1,640.00 2,300.00 13,125.00 15,095.00 98,440.00 118,125.00 39,375.00 22,970.00 21,000.00 26,250.00 39,375.00 20,000.00 16,275.00 21,000.00 16,800.00 19,690.00 2,300.00 4,100.00 310.00 1,970.00 52,500.00 45,940.00 98,440.00 1,315.00 16,405.00 78,750.00 32,815.00 5,250.00 2,100.00 3,675.00 985.00 1,050.00 5,583.33 1,278.00 15,750.00 9,190.00 2,363.00 1,838.00 525.00 1,838.00 36,750.00 2,625.00 23,625.00 3,150.00 7,875.00 15,225.00 26,250.00 7,875.00 5,500.00 11,250.00 10,500.00 8,820.00 29,250.00 26,250.00

1 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825

2 Tarikan Pintu (setara solid) 20" Venetion blinds Bambu / Dolken Gypsum 12 mm Gypsum 9 mm Kayu Profil 3/3 Kayu Profil 3/8 List Profil List Profil Gypsum Lumbressering Metal Furing (Rangka Plafond) Multipleks 4 mm Multipleks 6 mm Multipleks 9 mm Plywood 3 mm Plywood 4 mm Plywood 6 mm Softboard Teakwood 3x7 Teakwood 4x8 Tripleks 3 mm Tripleks 4 mm Tripleks 6 mm Lem Kayu Glass Bit Sabun Polimer Cat Anti Karat Genteng Onduline Stop Kran 1" PVC Stop Kran 1/2" Besi Stop Kran 2" PVC Stop Kran 3/4" Besi Lampu Taman Kecil Lampu Taman Sedang Lampu Taman Besar Poliurythane Agregat Pecah Mesin 0-5 mm Agregat Pecah Mesin 20-30 mm Agregat Pecah Mesin 50-70 mm Agregat Pecah Mesin 5-10 & 10-20 mm Anchorage Anti strpping agent Arbocell Asbuton Halus Asbuton yang diproses Aspal Emulsi Assetilline Bahan Modifikasi Bahan pengawet: kreosot Bahan Pengisi (Filler) Tambahan Baja Bergelombang Baja Prategang Batu Bara Batu Belah / Kerakal Bunker Oil Casing Cerucuk Curing Compound Ducting (Kabel prestress) Ducting (Strand prestress) Elastomer Alam Elastomer jenis 1 Elastomer jenis 2

pja pja pla pla pla pla pla pla pla pla pla pla pla pla pla pla pla pla pla pla pla pla pla z z z

3 Psg M² Btg Lbr Lbr Ujg Ujg M' M' Ujg Ujg Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Kg Kg Kg Kg Kg Lbr Bh Bh Bh Bh Bh Bh Bh M2 M3 M3 M3 M3 buah liter Kg. Ton Kg Kg Botol Kg liter Kg Kg Kg Kg M3 Liter M2 M Ltr M' M' Kg buah buah

4 Tidak Ada Tidak Ada Tidak Ada Tidak Ada 75,000.00 11,000.00 Tidak Ada 12,500.00 Tidak Ada 15,000.00 Tidak Ada 70,000.00 85,000.00 135,000.00 95,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada 80,000.00 52,000.00 70,000.00 85,000.00 15,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada

5 4 2 2 4 5 5 8 3 3 4 4 4 4 -

6 7 2 3 2 14 7 4 5 3 9 2 15 17 19 12 2 2 4 9 10 18 15 14 14 2 2 3 3 1 2 2 2 2 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

7 7,500.00 0.00 17,500.00 0.00 65,000.00 10,000.00 12,500.00 12,500.00 27,500.00 15,000.00 0.00 60,000.00 78,000.00 13,500.00 70,000.00 0.00 0.00 222,000.00 61,000.00 55,000.00 50,000.00 65,000.00 77,500.00 10,000.00 0.00 0.00 45,000.00 188,000.00 150,000.00 15,800.00 42,000.00 17,900.00 61,000.00 220,400.00 526,000.00 1,236,000.00 185,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8 310,000.00 0.00 17,500.00 0.00 85,000.00 15,000.00 14,000.00 15,000.00 27,500.00 130,000.00 0.00 73,000.00 90,000.00 142,000.00 95,000.00 0.00 0.00 247,000.00 115,000.00 125,000.00 56,000.00 74,000.00 90,000.00 28,500.00 0.00 0.00 45,000.00 188,000.00 150,000.00 95,000.00 43,000.00 112,000.00 63,600.00 220,400.00 526,000.00 1,236,000.00 197,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9 140,700.00 Tdk Ada Data 17,500.00 Tdk Ada Data 73,791.67 11,800.00 13,250.00 13,333.33 27,500.00 31,928.57 Tdk Ada Data 68,500.00 84,133.33 124,705.88 85,300.00 Tdk Ada Data Tdk Ada Data 234,500.00 77,071.43 84,625.00 53,031.25 69,192.31 83,250.00 18,083.33 Tdk Ada Data Tdk Ada Data 45,000.00 188,000.00 150,000.00 55,400.00 42,500.00 64,950.00 62,300.00 220,400.00 526,000.00 1,236,000.00 191,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data

10 140,700.00 Tdk Ada Data 17,500.00 Tdk Ada Data 75,000.00 11,000.00 13,250.00 12,500.00 27,500.00 15,000.00 Tdk Ada Data 70,000.00 85,000.00 135,000.00 95,000.00 Tdk Ada Data Tdk Ada Data 234,500.00 77,071.43 80,000.00 52,000.00 70,000.00 85,000.00 15,000.00 Tdk Ada Data Tdk Ada Data 45,000.00 188,000.00 150,000.00 55,400.00 42,500.00 64,950.00 62,300.00 220,400.00 526,000.00 1,236,000.00 191,000.00 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data

462,000.00 70,875.00 14,770.00 118,125.00 75,000.00 12,705.00 13,250.00 5,905.00 27,500.00 20,218.00 35,440.00 70,000.00 85,000.00 135,000.00 95,000.00 100,405.00 106,315.00 70,875.00 103,950.00 115,500.00 52,000.00 70,000.00 85,000.00 40,425.00 41,580.00 17,720.00 51,975.00 43,360.00 150,000.00 55,400.00 42,500.00 64,950.00 62,300.00 220,400.00 526,000.00 1,236,000.00 191,000.00 643,130.00 511,880.00 459,380.00 538,130.00 1,573,425.00 59,065.00 37,800.00 7,017,805.00 70,180.00 6,505.00 271,105.00 1,180.00 5,905.00 1,420.00 12,815.00 14,175.00 710.00 223,255.00 2,690.00 29,530.00 17,720.00 45,485.00 177,190.00 59,065.00 53,155.00 500,905.00 844,595.00

11 Penyesuaian 0.00 0.00 0.00 H-Dominan Penyesuaian H-Rata rata 0.00 H-Rata rata Penyesuaian 0.00 H-Dominan H-Dominan H-Dominan H-Dominan 0.00 0.00 0.00 Penyesuaian Penyesuaian H-Dominan H-Dominan H-Dominan Penyesuaian 0.00 0.00 Penyesuaian 0.00 H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-Rata rata H-14 H-14 H-14 H-14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

12 9% 11% 11% 11% 16% 9% 5% 11% 5% 9% 11% 18% 1% 14% 14% 11% 11% 11% 9% 9% 9% 14% 4% 9% 11% 11% 9% 11% Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data Tidak Ada Data 0% 0% 0% 0% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11% 11%

13 42,000.00 7,875.00 1,640.00 13,125.00 12,000.00 1,155.00 650.00 655.00 1,250.00 1,838.00 3,940.00 12,250.00 1,000.00 19,500.00 13,620.00 11,155.00 11,815.00 7,875.00 9,450.00 10,500.00 4,750.00 9,620.00 3,620.00 3,675.00 4,620.00 1,970.00 4,725.00 4,820.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 0.00 0.00 0.00 0.00 174,825.00 6,565.00 4,200.00 779,755.00 7,800.00 725.00 30,125.00 130.00 655.00 160.00 1,425.00 1,575.00 80.00 24,805.00 300.00 3,280.00 1,970.00 5,055.00 19,690.00 6,565.00 5,905.00 55,655.00 93,845.00

1 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889

2 Elastomer jenis 3 Elastomer Sintesis Expansion Cap Expansion Join Baja Siku Expansion Join Tipe Rubber Expansion Joint Tipe Torma Expansion Tipe Joint Asphaltic Plug Gravel Joint Sealent Joint Socket Pile 16x16x16 Joint Socket Pile 35x35 Kapur Kerb jenis 1 Kerb jenis 2 Kerb jenis 3 Kerb Type A Mikro Pile 16x16x16 Mini Timber Pile Minyak Fluks Oxygen Additive Bahan Agr.Base Kelas C2 Pasir Halus (untuk HRS) Pasir Tailing Pasir Urug (ada unsur lempung) Strip Bearing Tiang Pancang Baja Matras Concrete Cat Marka (Non Thermoplas) Polytene 125 mikron Kayu Acuan Aditif anti pengelupasan Mata Kucing PCI Girder L=17m PCI Girder L=21m PCI Girder L=26m PCI Girder L=32m PCI Girder L=36m PCI Girder L=41m Pelat Rambu (Eng. Grade) Pelat Rambu (High I. Grade) Pemantul Cahaya (Reflector) Pipa Baja Multipleks 12 mm Cansteen 15x28x40 Filler Cat Marka (Thermoplastic) Bahan Agr.Base Kelas A Bahan Agr.Base Kelas B Bahan Agr.Base Kelas C Baja Tulangan (Polos) U24 Baja Tulangan (Ulir) U32 Tiang Pancang Beton Pratekan Baja Tulangan (Polos) U32 Baja Tulangan (Ulir) U39 Baja Tulangan (Ulir) U48 Pipa Galvanis Dia 1,5" Profil Alumunium Swing Door 6 M Tiang Polos Profil Alumunium Swing Door 4,4 M Tiang Polos Profil Alumunium Swing Door 6 M Tiang Moher Profil Alumunium Swing Door 4,4 M Tiang Moher Profil Alumunium Swing Door Ambang Atas Profil Alumunium Swing Door Ambang Bawah Profil Alumunium Swing Door Tutup Ambang

3 buah Kg M2 M M M1 M M3 Kg Set Set M3 Buah Buah Buah Buah M1 Buah Liter Botol Ltr M3 M3 M3 M3 Buah M' Buah Kg Kg M3 Kg buah Buah Buah Buah Buah Buah Buah BH BH Bh. Kg Lbr Buah Kg Kg M³ M³ M³ Kg Kg M³ Kg Kg Kg M¹ Bh Bh Bh Bh Bh Bh Bh

4 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 2,394.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada 1,800,000.00 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada

5 2 2 -

6 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 0 2 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1

7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 230,000.00 170,000.00 240,000.00 180,000.00 210,000.00 315,000.00 50,000.00

8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 230,000.00 170,000.00 240,000.00 180,000.00 210,000.00 315,000.00 50,000.00

9 Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data Tdk Ada Data 230,000.00 170,000.00 240,000.00 180,000.00 210,000.00 315,000.00 50,000.00

10 11 12 1,088,875.00 Tdk Ada Data 0.00 11% 53,155.00 Tdk Ada Data 0.00 11% 7,145.00 Tdk Ada Data 0.00 11% 324,845.00 Tdk Ada Data 0.00 11% 1,417,500.00 Tdk Ada Data 0.00 11% 1,417,500.00 Tdk Ada Data 0.00 11% 1,215,270.00 Tdk Ada Data 0.00 11% 282,660.00 H-14 Tdk Ada Data 0% 40,285.00 Tdk Ada Data 0.00 11% 79,740.00 Tdk Ada Data 0.00 11% 717,615.00 Tdk Ada Data 0.00 11% 47,250.00 Tdk Ada Data 0.00 11% 53,155.00 Tdk Ada Data 0.00 11% 59,065.00 Tdk Ada Data 0.00 11% 64,970.00 Tdk Ada Data 0.00 11% 53,155.00 Tdk Ada Data 0.00 11% 71,765.00 Tdk Ada Data 0.00 11% 31,895.00 Tdk Ada Data 0.00 11% 2,394.00 H-Dominan 2,394.00 0% 135,550.00 Tdk Ada Data 0.00 11% 45,485.00 Tdk Ada Data 0.00 11% 97,335.00 Tdk Ada Data 0.00 11% 229,345.00 Tdk Ada Data 0.00 11% 305,945.00 Tdk Ada Data 0.00 11% 208,495.00 Tdk Ada Data 0.00 11% 271,105.00 Tdk Ada Data 0.00 11% 44,730.00 Tdk Ada Data 0.00 11% 478,405.00 Tdk Ada Data 0.00 11% 97,225.00 Tdk Ada Data 0.00 11% 22,735.00 Tdk Ada Data 0.00 11% 1,980,000.00 Penyesuaian 1,800,000.00 9% 59,065.00 Tdk Ada Data 0.00 11% 88,595.00 Tdk Ada Data 0.00 11% 148,995,000.00 Penyesuaian Tdk Ada Data 9% 168,052,500.00 Penyesuaian Tdk Ada Data 9% 214,830,000.00 Penyesuaian Tdk Ada Data 9% 272,002,500.00 Penyesuaian Tdk Ada Data 9% 291,060,000.00 Penyesuaian Tdk Ada Data 9% 332,640,000.00 Penyesuaian Tdk Ada Data 9% 186,875.00 Tdk Ada Data 0.00 11% 238,850.00 Tdk Ada Data 0.00 11% 14,885.00 Tdk Ada Data 0.00 11% 19,495.00 Tdk Ada Data 0.00 11% 214,405.00 Tdk Ada Data 0.00 11% #DIV/0! Tdk Ada Data #DIV/0! Tidak Ada Data 1,700.00 Penyesuaian Tdk Ada Data 26% #DIV/0! Tdk Ada Data #DIV/0! Tidak Ada Data Cek_Item Tdk Ada Data H-14 Tidak Ada Data Cek_Item Tdk Ada Data H-14 Tidak Ada Data Cek_Item Tdk Ada Data H-14 Tidak Ada Data 11,700.00 Penyesuaian Tdk Ada Data Tidak Ada Data 12,815.00 Penyesuaian Tdk Ada Data Tidak Ada Data #DIV/0! Tdk Ada Data #DIV/0! Tidak Ada Data #DIV/0! Tdk Ada Data #DIV/0! Tidak Ada Data #DIV/0! Tdk Ada Data #DIV/0! Tidak Ada Data #DIV/0! Tdk Ada Data #DIV/0! Tidak Ada Data #VALUE! Tdk Ada Data #VALUE! Tidak Ada Data #VALUE! 230,000.00 #VALUE! Tidak Ada Data #VALUE! 170,000.00 #VALUE! Tidak Ada Data #VALUE! 240,000.00 #VALUE! Tidak Ada Data #VALUE! 180,000.00 #VALUE! Tidak Ada Data #VALUE! 210,000.00 #VALUE! Tidak Ada Data #VALUE! 315,000.00 #VALUE! Tidak Ada Data #VALUE! 50,000.00 #VALUE! Tidak Ada Data

13 120,985.00 5,905.00 795.00 36,095.00 157,500.00 157,500.00 135,030.00 0.00 4,475.00 8,860.00 79,735.00 5,250.00 5,905.00 6,565.00 7,220.00 5,905.00 7,975.00 3,545.00 0.00 15,060.00 5,055.00 10,815.00 25,485.00 33,995.00 23,165.00 30,125.00 4,970.00 53,155.00 10,805.00 2,525.00 180,000.00 6,565.00 9,845.00 13,545,000.00 15,277,500.00 19,530,000.00 24,727,500.00 26,460,000.00 30,240,000.00 20,765.00 26,540.00 1,655.00 2,165.00 23,825.00 #DIV/0! 440.00 #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

1 890 891 892 893 894

2 Profil Alumunium Swing Door Skoneng (Besar) Profil Alumunium Swing Door 6 M Tiang Sliding Profil Alumunium Swing Door 4,4 M Tiang Sliding Profil Alumunium Swing Door 6 M Tiang Sliding Kait Profil Alumunium Swing Door 4,4 M Tiang Sliding Kait

3 Bh Bh Bh Bh Bh

4 Tidak Ada Tidak Ada Tidak Ada Tidak Ada Tidak Ada

5 -

6 1 1 1 1 1

7 60,000.00 120,000.00 82,000.00 120,000.00 88,000.00

8 60,000.00 120,000.00 82,000.00 120,000.00 88,000.00

9 60,000.00 120,000.00 82,000.00 120,000.00 88,000.00

60,000.00 120,000.00 82,000.00 120,000.00 88,000.00

895

Profil Alumunium Shop Front 1½ X 3 " (M) Profil Alumunium Shop Front 1½ X 3 " (Open Back) Profil Alumunium Shop Front 1½ X 3 " (Jip/Tangga) Profil Alumunium Shop Front 1½ X 3 " (Tutup Jip/Tangga) Profil Alumunium Shop Front 1½ X 3 " (Tutup Kaca Mati) Profil Alumunium Shop Front 1½ X 3 " (Tutup Kaca Polos) Profil Alumunium Shop Front 1⅞ X 4 " (M) Profil Alumunium Shop Front 1⅞ X 4 " (Open Back) Profil Alumunium Shop Front 1⅞ X 4 " (Jip/Tangga) Profil Alumunium Shop Front 1⅞ X 4 " (Tutup Kaca Mati) Profil Alumunium Casement (Frame) Profil Alumunium Casement (Skoneng)

Bh

Tidak Ada

-

2

130,000.00

150,000.00

140,000.00

140,000.00

Bh

Tidak Ada

-

2

130,000.00

138,000.00

134,000.00

134,000.00

Bh

Tidak Ada

-

1

140,000.00

140,000.00

140,000.00

140,000.00

Bh

Tidak Ada

-

1

55,000.00

55,000.00

55,000.00

55,000.00

Bh

Tidak Ada

-

1

75,000.00

75,000.00

75,000.00

75,000.00

Bh

Tidak Ada

-

1

50,000.00

50,000.00

50,000.00

50,000.00

Bh

Tidak Ada

-

2

196,000.00

215,000.00

205,500.00

205,500.00

Bh

Tidak Ada

-

2

185,000.00

197,000.00

191,000.00

191,000.00

Bh

Tidak Ada

-

1

200,000.00

200,000.00

200,000.00

200,000.00

Bh

Tidak Ada

-

1

105,000.00

105,000.00

105,000.00

105,000.00

Bh

Tidak Ada

-

1

195,000.00

195,000.00

195,000.00

195,000.00

Tidak Ada

-

1

A.A Sliding A.B Sliding R.A Sliding R.S Sliding 4,4 M R.S Sliding 6 M R.B Sliding

Bh Bh Bh Bh Bh Bh Bh

195,000.00 94,000.00 148,000.00 149,000.00 71,000.00 96,000.00 120,000.00

Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Kg Ls

-

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0

195,000.00 94,000.00 148,000.00 149,000.00 71,000.00 96,000.00 120,000.00

Tiang Sliding Ekon Tiang Sliding Kait Ekon A.A Sliding Ekonomi A.B Sliding Ekonomi R.A Sliding Door R.S Slid Ekonomi R.B Sliding Door Troling Full U. Roling Center Post 10 Center Post 11,4 M Skrup 3 M Skrup 4 Hollow 1/2 X 3/4 Down Roling Full Down Roling Kunci Cuartain Wall (5303) Cuartain Wall (5304) Cuartain Wall (5305) Baja Struktur Perlengkapan

2

195,000.00 94,000.00 148,000.00 149,000.00 71,000.00 96,000.00 120,000.00

913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933

Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak Tidak

195,000.00 94,000.00 148,000.00 149,000.00 71,000.00 96,000.00 120,000.00 73,000.00 87,000.00 70,000.00 98,000.00 120,000.00 66,000.00 94,000.00 127,000.00 86,000.00 200,000.00 241,000.00 175,000.00 230,000.00 32,000.00 55,000.00 47,000.00 174,000.00 77,000.00 159,000.00 0.00 0.00

73,000.00 73,000.00 73,000.00 87,000.00 87,000.00 87,000.00 70,000.00 70,000.00 70,000.00 98,000.00 98,000.00 98,000.00 120,000.00 120,000.00 120,000.00 66,000.00 66,000.00 66,000.00 94,000.00 94,000.00 94,000.00 127,000.00 127,000.00 127,000.00 86,000.00 86,000.00 86,000.00 200,000.00 200,000.00 200,000.00 241,000.00 241,000.00 241,000.00 175,000.00 175,000.00 175,000.00 230,000.00 230,000.00 230,000.00 32,000.00 32,000.00 32,000.00 55,000.00 55,000.00 55,000.00 47,000.00 47,000.00 47,000.00 174,000.00 174,000.00 174,000.00 77,000.00 77,000.00 77,000.00 159,000.00 159,000.00 159,000.00 0.00 Tdk Ada Data Tdk Ada Data 0.00 Tdk Ada Data Tdk Ada Data

934

Semen tahan Asam

Kg

-

2

0

896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912

Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada Ada

0.00

0.00 Tdk Ada Data

10

Tdk Ada Data

11

12

#VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data 86,000.00 H-Rata rata Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data #VALUE! #VALUE! Tidak Ada Data 20,000.00 Penyesuaian Tidak Ada Data 200.00 0.00 100% 2,000.00 Penyesuaian 100%

13 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 200.00 2,000.00

HARGA TAMBAHAN / PENYESUAIAN

(Rp.) 17 333,930.00 266,220.00 285,940.00 289,790.00 289,790.00 200.00 30,000.00 11,130.00 1,500,000.00 850.00

235,200.00 350,000.00

179,025.00

167,475.00 190,575.00 196,350.00 375,000.00 337,500.00 312,500.00 287,500.00

51,975.00 17,325.00 4,048.00

11,416.00

205,000.00 205,000.00 205,000.00 3,500.00 4,000.00

HARGA BAHAN 2014

(Rp.) 14 333,930.00 266,220.00 285,940.00 289,790.00 289,790.00 130.00 26,250.00 12,000.00 1,365,000.00 790.00 2,100.00 120,750.00 6,300.00 1,580.00 235,200.00 198,450.00 210,000.00 131,250.00 147,000.00 162,750.00 194,250.00 194,250.00 152,250.00 173,250.00 178,500.00 178,500.00 Cek_Item Cek_Item Cek_Item Cek_Item 136,500.00 120,750.00 4,730.00 10,390.00 25,460.00 47,250.00 15,750.00 6,830.00 3,680.00 13,130.00 78,750.00 950.00 682,500.00 289,790.00 289,790.00 10,500.00 7,880.00 11,030.00 30,980.00 47,250.00 10,660.00 185,330.00 185,330.00 Cek_Item Cek_Item Cek_Item 6,500.00

HARGA PROP USULAN UNTUK KOTA UNTUK 2015 MANADO 2015 KE ASET, MAX Triwulan 1

(Rp.) 15 417,410.00 332,780.00 357,430.00 362,240.00 362,240.00 160.00 32,810.00 12,000.00 1,706,250.00 990.00 2,630.00 150,940.00 7,880.00 1,980.00 294,000.00 248,060.00 262,500.00 164,060.00 183,750.00 203,440.00 242,810.00 242,810.00 190,310.00 216,560.00 223,130.00 223,130.00 Cek_Item Cek_Item Cek_Item Cek_Item 170,630.00 150,940.00 5,910.00 12,990.00 31,830.00 59,060.00 15,750.00 8,540.00 4,600.00 16,410.00 98,440.00 1,190.00 853,130.00 362,240.00 362,240.00 13,130.00 9,850.00 13,790.00 38,730.00 59,060.00 13,330.00 231,660.00 231,660.00 Cek_Item Cek_Item Cek_Item 6,500.00

(Rp.) 16

UD. PERINTIS

7 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

JEMBATAN LIMA

ANEKA JAYA

8 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

9

SUMBER KERAMIK JAYA

10 1,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 525,000.00 270,000.00 Cek_Item Cek_Item Cek_Item Cek_Item -

INTI MURNI

11 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

BERCAHAYA TIMUR

12 Cek_Item Cek_Item Cek_Item Cek_Item 500,000.00 Cek_Item Cek_Item -

MANGUNI JAYA

13 -

14 -

900.00 -

15 -

800.00 3,000.00 -

137,500.00

KARYA SEMIGA

KLABAT

500.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 3,000.00 1,100,000.00 1,100,000.00 550,000.00 425,000.00 550,000.00 Cek_Item Cek_Item 18,000.00 Cek_Item Cek_Item -

PELITA JAYA

16

17 800.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 350,000.00 350,000.00 500,000.00 Cek_Item Cek_Item Cek_Item Cek_Item -

1,000.00 3,800.00 137,500.00 240,000.00 Cek_Item Cek_Item Cek_Item Cek_Item 37,500.00 3,800.00 1,200,000.00 1,200,000.00 1,200,000.00 500,000.00 500,000.00 Cek_Item 2,100.00 Cek_Item -

SUMBER AGUNG

PINTU KOTA

18 Cek_Item Cek_Item Cek_Item Cek_Item 2,400.00 1,300,000.00 400,000.00 475,000.00 Cek_Item Cek_Item -

MURNI

19 800.00 143,750.00 Cek_Item Cek_Item Cek_Item Cek_Item 2,600.00 1,175,000.00 475,000.00 475,000.00 Cek_Item 1,800.00 Cek_Item -

17 10,838.00

13,860.00

20,218.00

92,400.00 1,126,125.00 410,025.00

34,650.00 436,975.00 600,600.00

23,100.00 46,200.00 693,000.00 750,750.00 577,500.00 28,875.00 34,650.00 20,218.00 20,218.00 63,525.00 25,993.00

14 10,750.00 1,260.00 2,630.00 12,600.00 134,610.00 52,500.00 57,180.00 52,500.00 71,470.00 3,150.00 50,820.00 67,420.00 18,380.00 42,000.00 60,380.00 68,250.00 97,130.00 156,140.00 81,380.00 99,750.00 115,500.00 120,750.00 126,000.00 146,920.00 126,000.00 252,000.00 92,400.00

15 10,750.00 1,580.00 3,290.00 15,750.00 168,260.00 65,630.00 71,480.00 65,630.00 89,340.00 3,940.00 63,530.00 84,280.00 22,980.00 52,500.00 75,480.00 85,310.00 121,410.00 195,180.00 101,730.00 124,690.00 144,380.00 150,940.00 157,500.00 183,650.00 157,500.00 315,000.00 115,500.00

1,023,750.00 372,750.00 614,250.00 294,000.00 210,000.00 367,500.00 241,500.00 210,000.00 157,500.00 262,500.00 168,000.00 31,500.00 18,900.00 397,250.00 546,000.00 441,000.00 661,500.00 21,000.00 21,000.00 42,000.00 26,250.00 630,000.00 682,500.00 525,000.00 890.00 26,250.00 31,500.00 18,380.00 21,000.00 18,380.00 57,750.00 23,100.00 23,630.00 787,500.00 212,210.00 21,000.00 136,500.00

1,279,690.00 465,940.00 767,810.00 367,500.00 262,500.00 459,380.00 301,880.00 262,500.00 196,880.00 328,130.00 210,000.00 39,380.00 23,630.00 496,560.00 682,500.00 551,250.00 826,880.00 26,250.00 26,250.00 52,500.00 32,810.00 787,500.00 853,130.00 656,250.00 1,110.00 32,810.00 39,380.00 22,980.00 26,250.00 22,980.00 72,190.00 28,880.00 29,540.00 984,380.00 265,260.00 26,250.00 170,630.00

16

7 -

-

-

8 -

2,340.00 12,500.00 102,000.00 138,000.00 -

9 -

2,500.00

4,000.00 15,000.00

90,000.00 140,000.00 47,000.00 -

65,000.00 105,000.00 195,000.00 -

1,075,000.00 380,000.00 645,000.00

25,000.00 27,500.00 20,000.00 65,000.00 28,500.00 270,000.00 420,000.00 235,000.00 25,000.00 13,500.00 25,000.00 16,000.00 5,000.00 30,000.00 20,000.00 -

-

40,000.00 40,000.00 175,000.00 -

5,000.00 12,000.00 -

-

25,000.00 20,000.00 70,000.00 25,000.00 25,000.00

22,500.00 65,000.00

-

32,500.00

-

15,000.00

-

-

-

15,000.00

-

16,000.00 -

25,000.00 20,000.00 -

11 -

45,000.00 65,000.00 97,500.00 -

65,000.00 28,000.00 39,000.00 -

19,000.00 19,000.00 -

10 -

-

2,000.00 12,000.00 25,000.00 20,000.00 -

12

1,600.00 2,400.00 35,000.00 105,000.00 50,000.00 72,500.00 90,000.00 155,000.00 -

60,000.00 145,000.00

37,500.00 27,500.00 14,000.00

13 -

1,700.00 1,700.00 12,500.00 -

2,000.00 -

-

20,000.00 45,000.00

-

-

-

-

20,000.00 60,000.00 30,000.00 -

-

15,000.00 30,000.00 15,000.00

15,000.00 -

25,000.00 20,000.00 -

14 -

-

10,000.00 20,000.00 20,000.00

25,000.00 -

-

15 -

16 -

1,700.00 2,500.00

1,500.00 2,400.00 45,000.00

450,000.00 150,000.00 150,000.00 150,000.00 65,000.00 85,000.00 -

200,000.00 200,000.00 200,000.00 -

25,000.00 20,000.00 35,000.00 15,000.00 15,000.00 8,000.00 25,000.00 20,000.00 -

-

17 -

2,100.00 2,300.00 13,000.00

350,000.00 650,000.00 320,000.00 170,000.00 65,000.00 37,000.00 300,000.00 500,000.00 250,000.00 15,000.00 37,000.00 15,000.00 25,000.00 20,000.00 -

-

40,000.00 70,000.00 75,000.00 110,000.00 195,000.00

-

-

25,000.00 25,000.00 15,000.00

6,600.00 20,000.00 16,000.00 2,800,000.00 -

19 -

1,500.00 5,000.00 15,000.00 -

-

-

1,180.00 1,900.00 13,000.00 -

18,000.00 25,000.00

-

18 -

-

-

13,000.00

1,600.00 1,800.00 12,000.00

200,000.00 30,000.00 37,500.00 70,000.00 -

90,000.00 150,000.00

75,000.00 20,000.00 35,000.00 12,000.00 20,000.00 -

14,000.00 22,000.00 20,000.00 -

15,000.00 16,000.00 -

25,000.00 25,000.00 -

10,000.00 20,000.00 20,000.00

17 2,021,250.00

34,650.00

46,200.00

43,318.00 28,875.00 3,465.00

46,200.00 51,975.00

57,750.00

57,750.00 46,200.00 40,425.00

11,550.00

606,375.00 167,475.00 144,375.00 225,225.00

10,000,000.00 10,000,000.00 7,350,000.00 5,250,000.00 1,800,000.00 2,200,000.00 46,200.00

14 1,837,500.00 210.00 630.00 10,400.00 31,500.00 63,000.00 84,000.00 131,250.00 168,000.00 11,390.00 134,930.00 165,200.00 228,440.00 337,580.00 320,120.00 419,480.00 13,130.00 15,750.00 42,000.00 34,130.00 23,630.00 39,380.00 52,500.00 26,250.00 3,150.00 52,500.00 47,250.00 115,190.00 42,000.00 47,250.00 67,200.00 21,000.00 15,750.00 52,500.00 1,260.00 10,500.00 52,500.00 42,000.00 12,600.00 36,750.00 21,000.00 1,050.00 20,650.00 18,810.00 39,380.00 52,500.00 10,500.00 10,500.00 29,660.00 1,050,000.00 551,250.00 152,250.00 131,250.00 204,750.00 152,250.00 210,000.00 10,000,000.00 10,000,000.00 7,000,000.00 5,000,000.00 1,800,000.00 2,100,000.00 42,000.00 27,830.00

15 2,296,880.00 260.00 790.00 13,000.00 39,380.00 78,750.00 105,000.00 164,060.00 210,000.00 14,240.00 168,660.00 206,500.00 285,550.00 421,980.00 400,150.00 524,350.00 16,410.00 19,690.00 52,500.00 42,660.00 29,540.00 49,230.00 65,630.00 32,810.00 3,940.00 65,630.00 59,060.00 143,990.00 52,500.00 59,060.00 84,000.00 26,250.00 19,690.00 65,630.00 1,580.00 13,130.00 65,630.00 52,500.00 15,750.00 45,940.00 26,250.00 1,310.00 25,810.00 23,510.00 49,230.00 65,630.00 13,130.00 13,130.00 37,080.00 1,312,500.00 689,060.00 190,310.00 164,060.00 255,940.00 190,310.00 262,500.00 10,000,000.00 10,000,000.00 7,000,000.00 5,000,000.00 1,800,000.00 2,100,000.00 52,500.00 34,790.00

16

7 8 130,000.00 30,000.00 61,000.00 91,000.00 142,500.00 175,000.00 Cek_Item Cek_Item 175,000.00 240,000.00 Cek_Item Cek_Item 355,000.00 Cek_Item Cek_Item 21,500.00 39,000.00 Cek_Item Cek_Item 2,500.00 125,000.00 52,000.00 28,500.00 225,000.00 110,000.00 40,000.00 50,000.00 75,000.00 28,500.00 65,000.00 Cek_Item Cek_Item 37,500.00 22,500.00 42,500.00 58,000.00 12,500.00 12,500.00 2,000,000.00 -

9 29,500.00 65,000.00 85,000.00 Cek_Item Cek_Item Cek_Item 32,500.00 Cek_Item 95,000.00 40,000.00 52,500.00 5,000.00 22,500.00 30,000.00 Cek_Item 35,000.00 22,500.00 17,500.00 -

10

11

12

-

-

-

30,000.00 67,000.00 98,000.00 145,000.00 165,000.00 Cek_Item 155,000.00 165,000.00 Cek_Item Cek_Item Cek_Item 15,000.00 5,000.00 125,000.00 51,000.00 125,000.00 45,000.00 5,000.00 Cek_Item 27,000.00 25,000.00 45,000.00 15,000.00 12,000.00 -

25,000.00 67,500.00 90,000.00 140,000.00 170,000.00 Cek_Item Cek_Item Cek_Item 24,000.00 42,500.00 Cek_Item 3,000.00 115,000.00 55,000.00 195,000.00 185,000.00 85,000.00 35,000.00 72,500.00 Cek_Item 35,000.00 25,000.00 8,000.00 40,000.00 10,000.00 220,000.00 -

27,500.00 65,000.00 95,000.00 130,000.00 162,500.00 Cek_Item Cek_Item Cek_Item Cek_Item 120,000.00 108,500.00 90,000.00 71,500.00 31,500.00 Cek_Item 22,500.00 42,000.00 47,500.00 -

13 -

14 -

30,000.00 32,000.00 92,000.00 135,000.00 Cek_Item Cek_Item Cek_Item 20,000.00 35,000.00 Cek_Item 4,000.00 45,000.00 35,000.00 95,000.00 45,000.00 50,000.00 45,000.00 35,000.00 35,000.00 Cek_Item 37,500.00 25,000.00 20,000.00 50,000.00 30,000.00 10,000.00

15

16 10,000.00 26,000.00 25,000.00 64,000.00 50,000.00 96,000.00 70,000.00 147,000.00 135,000.00 174,000.00 175,000.00 Cek_Item Cek_Item 135,000.00 174,000.00 175,000.00 Cek_Item Cek_Item Cek_Item Cek_Item 22,000.00 50,000.00 Cek_Item Cek_Item 8,000.00 12,000.00 3,500.00 115,000.00 150,000.00 55,000.00 55,000.00 30,000.00 210,000.00 110,000.00 90,000.00 50,000.00 45,000.00 850,000.00 50,000.00 90,000.00 85,000.00 110,000.00 36,000.00 40,000.00 Cek_Item Cek_Item 35,000.00 40,000.00 80,000.00 25,000.00 58,000.00 58,000.00 60,000.00 45,000.00 45,000.00 10,000.00 8,000.00 1,900,000.00 1,900,000.00 35,000.00 -

22,000.00 50,000.00 75,000.00

165,000.00 Cek_Item 165,000.00 Cek_Item Cek_Item 40,000.00 75,000.00 10,000.00 22,500.00 Cek_Item 10,000.00 15,000.00 55,000.00 40,000.00 90,000.00 50,000.00 55,000.00 85,000.00 60,000.00 57,500.00 Cek_Item 22,500.00 10,000.00 45,000.00 45,000.00 70,000.00 25,000.00 10,000.00 8,000,000.00 8,000,000.00 5,750,000.00 5,500,000.00 4,100,000.00 4,500,000.00 40,000.00 -

17 9,000.00 -

18 -

19

500.00 -

23,000.00 70,000.00 58,000.00 102,000.00 78,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 45,000.00 16,000.00 58,000.00 35,000.00 45,000.00 Cek_Item Cek_Item 10,000.00 3,000.00 50,000.00 55,000.00 68,000.00 28,000.00 108,000.00 50,000.00 108,000.00 40,000.00 20,000.00 68,000.00 80,000.00 75,000.00 30,000.00 Cek_Item Cek_Item 8,000.00 15,000.00 23,000.00 20,000.00 40,000.00 55,000.00 40,000.00 65,000.00 3,000,000.00 1,800,000.00 -

30,000.00 65,000.00 100,000.00 135,000.00 155,000.00 Cek_Item Cek_Item Cek_Item Cek_Item 3,000.00 110,000.00 45,000.00 35,000.00 110,000.00 95,000.00 45,000.00 50,000.00 70,000.00 35,000.00 30,000.00 Cek_Item 60,000.00 20,000.00 45,000.00 25,000.00 10,000.00 1,500,000.00 -

17 63,525.00 63,525.00 93,555.00 54,868.00 39,270.00

34,650.00

57,750.00

127,050.00

66,418.00 75,075.00 60,060.00 67,573.00

2,887,500.00

115,500.00

83,743.00 115,500.00

14 57,750.00 72,190.00 57,750.00 85,050.00 68,250.00 49,880.00 35,700.00 31,500.00 31,500.00 28,880.00 36,750.00 73,500.00 31,500.00 47,250.00 31,500.00 5,250.00 36,750.00 24,150.00 18,380.00 10,500.00 28,880.00 23,630.00 52,500.00 36,750.00 35,700.00 35,700.00 115,500.00 57,750.00 50,400.00 58,800.00 44,100.00 54,600.00 78,750.00 39,900.00 52,500.00 60,380.00 68,250.00 39,380.00 54,600.00 61,430.00 5,250.00 315,000.00 3,150.00 3,410.00 2,625,000.00 2,100.00 4,880.00 9,890.00 2,360.00 5,250.00 8,750.00 73,500.00 31,500.00 0.00 63,000.00 105,000.00 119,700.00 52,500.00 76,130.00 85,050.00 105,000.00 157,500.00 296,630.00 31,500.00

15 72,190.00 90,240.00 72,190.00 106,310.00 85,310.00 62,350.00 44,630.00 39,380.00 39,380.00 36,100.00 45,940.00 91,880.00 39,380.00 59,060.00 39,380.00 6,560.00 45,940.00 30,190.00 22,980.00 13,130.00 36,100.00 29,540.00 65,630.00 45,940.00 44,630.00 44,630.00 144,380.00 72,190.00 63,000.00 73,500.00 55,130.00 68,250.00 98,440.00 49,880.00 65,630.00 75,480.00 85,310.00 49,230.00 68,250.00 76,790.00 6,560.00 393,750.00 3,940.00 4,260.00 3,281,250.00 2,630.00 6,100.00 12,360.00 2,950.00 6,560.00 10,940.00 91,880.00 39,380.00 0.00 78,750.00 131,250.00 149,630.00 65,630.00 95,160.00 106,310.00 131,250.00 196,880.00 370,790.00 39,380.00

16

7 83,500.00 32,000.00 155,000.00 Cek_Item 35,000.00 35,000.00 53,000.00 54,000.00 53,000.00 80,000.00 45,000.00 46,000.00 65,000.00 65,000.00 75,000.00 62,000.00 60,000.00 65,000.00 225,000.00 225,000.00 -

8 Cek_Item -

9 Cek_Item 55,000.00 55,000.00 43,500.00 45,000.00 57,500.00 67,500.00 -

10 Cek_Item 50,000.00 80,000.00 55,000.00 50,000.00 65,000.00 50,000.00 65,000.00 -

11 30,000.00 Cek_Item 30,000.00 52,000.00 62,000.00 50,000.00 80,000.00 65,000.00 60,000.00 -

12 Cek_Item 15,000.00 60,000.00 42,000.00 43,000.00 -

13 150,000.00 Cek_Item 53,000.00 85,000.00 43,000.00 60,000.00 65,000.00 55,000.00 -

14 55,000.00 90,000.00 35,000.00 150,000.00 Cek_Item 27,500.00 27,500.00 10,000.00 1,850,000.00 25,000.00 65,000.00 45,000.00 1,650,000.00 55,000.00 55,000.00 55,000.00 85,000.00 42,500.00 55,000.00 55,000.00 85,000.00 45,000.00 55,000.00 75,000.00 65,000.00 65,000.00 65,000.00 75,000.00 65,000.00 65,000.00 75,000.00 125,000.00 -

15 -

16 -

46,000.00 46,000.00 Cek_Item 30,000.00 30,000.00 90,000.00 55,000.00 65,000.00 43,000.00 45,000.00 65,000.00 75,000.00 85,000.00 -

17

80,000.00 31,000.00 -

Cek_Item 52,500.00 50,000.00 60,000.00 41,000.00 45,000.00 65,000.00 65,000.00 70,000.00 175,000.00 -

42,000.00 Cek_Item 70,000.00 53,000.00 70,000.00 40,000.00 45,000.00 60,000.00 62,000.00 60,000.00 62,000.00 -

18 Cek_Item 15,000.00 50,000.00 49,000.00 50,000.00 68,000.00 68,000.00 70,000.00 -

19 30,000.00 Cek_Item 30,000.00 30,000.00 75,000.00 50,000.00 45,000.00 65,000.00 70,000.00 70,000.00 65,000.00 70,000.00 70,000.00 -

17

2,079.00

519,750.00 577,500.00 3,465,000.00 10,741,500.00 23,100.00 3,465,000.00 1,732,500.00 981,750.00 202,125.00 1,097,250.00 64,900.00 108,515.00

14 52,500.00 1,310.00 2,310.00 1,160.00 1,890.00 2,100.00 2,360.00 2,630.00 4,170.00 4,400.00 6,830.00 9,350.00 9,140.00 13,660.00 49,880.00 31,500.00 35,700.00 33,600.00 1,840.00 1,580.00 1,680.00 1,890.00 32,550.00 32,550.00 34,650.00 36,750.00 37,800.00 39,380.00 6,300.00 6,830.00 4,730.00 2,360.00 890.00 29,400.00 44,100.00 89,250.00 157,500.00 1,730.00 3,680.00 7,350.00 8,270.00 3,680.00 68,250.00 262,500.00 472,500.00 525,000.00 3,150,000.00 9,765,000.00 21,000.00 3,150,000.00 1,575,000.00 1,575,000.00 892,500.00 183,750.00 997,500.00 59,000.00 98,650.00 36,750.00 21,000.00 70,880.00 118,130.00 28,880.00 15,750.00 9,450.00

15 65,630.00 1,640.00 2,890.00 1,450.00 2,360.00 2,630.00 2,950.00 3,290.00 5,210.00 5,500.00 8,540.00 11,690.00 11,430.00 17,080.00 62,350.00 39,380.00 44,630.00 42,000.00 2,300.00 1,980.00 2,100.00 2,360.00 40,690.00 40,690.00 43,310.00 45,940.00 47,250.00 49,230.00 7,880.00 8,540.00 5,910.00 2,950.00 1,110.00 36,750.00 55,130.00 111,560.00 196,880.00 2,160.00 4,600.00 9,190.00 10,340.00 4,600.00 85,310.00 328,130.00 590,630.00 656,250.00 3,937,500.00 12,206,250.00 26,250.00 3,937,500.00 1,968,750.00 1,968,750.00 1,115,630.00 229,690.00 1,246,880.00 73,750.00 123,310.00 45,940.00 26,250.00 88,600.00 147,660.00 36,100.00 19,690.00 11,810.00

16

7 160,000.00 550,000.00 350,000.00 20,000.00 605,000.00 245,000.00 15,000.00 195,000.00 135,000.00 346,000.00 580,000.00 147,500.00 67,500.00

8 -

9 -

-

10 -

63,500.00 63,500.00 52,000.00 275,000.00 500,000.00 -

-

550,000.00 150,000.00

-

60,000.00

60,000.00 65,000.00

50,000.00 195,000.00 320,000.00 275,000.00 15,000.00 650,000.00 125,000.00

17,500.00 20,000.00

-

11 -

20,000.00 35,000.00 -

110,000.00 475,000.00 525,000.00 150,000.00 -

2,500,000.00 600,000.00 265,000.00 10,000.00 170,000.00 105,000.00 375,000.00 650,000.00 135,000.00 80,000.00 52,500.00

12 -

13 -

14 -

200,000.00 200,000.00 350,000.00

-

-

95,000.00

-

15,000.00

-

-

15 -

16 -

65,000.00 -

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 70,000.00 75,000.00 65,000.00 75,000.00 85,000.00 65,000.00 275,000.00 250,000.00 230,000.00 475,000.00 350,000.00 390,000.00 250,000.00 300,000.00 325,000.00 2,800,000.00 45,000.00 50,000.00 35,000.00 2,800,000.00 2,000,000.00 2,300,000.00 1,500,000.00 1,650,000.00 575,000.00 1,800,000.00 135,000.00 450,000.00 135,000.00 1,100,000.00 20,000.00 20,000.00 20,000.00 25,000.00 25,000.00 25,000.00 135,000.00 190,000.00 200,000.00 65,000.00 98,000.00 125,000.00 250,000.00 350,000.00 345,000.00 545,000.00 140,000.00 1,025,000.00 125,000.00 120,000.00 140,000.00 42,000.00 100,000.00 170,000.00 55,000.00 -

17

18

60,000.00 185,000.00 400,000.00 650,000.00 130,000.00 15,000.00 25,000.00 -

19 -

200,000.00 400,000.00

190,000.00 325,000.00 17,500.00 -

200,000.00 130,000.00 800,000.00 15,000.00 17,000.00 -

390,000.00 100,000.00 175,000.00 20,000.00

17

13,860.00 9,823.00 28,875.00 6,930.00 11,550.00 17,325.00

9,240.00 4,620.00 28,875.00 5,203.00 48,510.00

14 89,630.00 57,750.00 13,130.00 15,750.00 7,880.00 25,000.00 55,130.00 10,500.00 12,600.00 8,930.00 26,250.00 34,340.00 6,300.00 10,500.00 15,750.00 4,330.00 5,250.00 8,400.00 4,200.00 26,250.00 4,730.00 44,100.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item

15 112,040.00 72,190.00 16,410.00 19,690.00 9,850.00 31,250.00 68,910.00 13,130.00 15,750.00 11,160.00 32,810.00 42,930.00 7,880.00 13,130.00 19,690.00 5,410.00 6,560.00 10,500.00 5,250.00 32,810.00 5,910.00 55,130.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item

16 -

-

-

7 225,000.00 12,500.00 9,500.00 6,500.00 37,500.00 62,000.00 78,000.00

8

9 -

39,000.00 65,000.00 80,000.00 22,000.00 28,000.00 57,000.00

160,000.00 270,000.00

36,000.00 60,000.00 76,000.00 52,000.00 20,000.00 145,000.00 27,000.00 234,000.00

10 -

54,000.00 20,000.00 155,000.00 26,000.00 256,000.00

11 150,000.00 72,500.00 37,500.00 67,500.00 80,000.00 60,000.00 20,000.00 160,000.00 29,000.00 240,000.00

12

13 -

36,000.00 60,000.00 76,500.00

52,000.00 20,000.00 145,000.00 26,500.00 240,000.00

40,000.00 65,000.00 80,000.00

-

14 -

15 58,000.00

12,500.00 9,000.00 35,000.00 115,000.00 151,000.00 19,000.00 26,000.00 54,000.00 19,000.00 155,000.00 26,000.00 265,000.00

-

36,000.00 20,000.00 79,000.00 20,000.00 27,000.00 53,000.00 20,000.00 158,000.00 27,000.00 247,000.00

-

16 175,000.00 400,000.00 80,000.00 12,000.00 8,000.00 7,000.00 35,000.00 60,000.00 75,000.00 -

17

18 -

35,000.00 60,000.00 72,000.00 50,000.00 18,000.00 140,000.00 25,000.00 220,000.00

19 -

30,000.00 50,000.00 60,000.00

35,000.00 65,000.00 75,000.00 20,000.00 25,000.00 -

130,000.00 25,000.00 130,000.00

150,000.00 230,000.00

17

14 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item

15 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item

16

7

8

9

10

11

12

13

14

15

16

17

18

19

17

14 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item

15 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item

16

7

8

9

10

11

12

13

14

15

16

17

18

19

17

14 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item

15 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item

16

7

8

9

10

11

12

13

14

15

16

17

18

19

17

14 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item

15 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item

16

7

8

9

10

11

12

13

14

15

16

17

18

19

17

12,705,000.00 1,732,500.00 1,129,018.00 2,887,500.00 4,042,500.00

6,063,750.00 4,620,000.00 1,583,505.00 638,110.00 40,425.00 41,151.00

404,250.00 1,848,000.00 2,310,000.00 3,349,500.00 6,930,000.00 7,507,500.00 1,039,500.00

69,300.00 34,650.00 37,543.00 37,500.00 27,500.00 33,750.00 65,000.00 51,975.00 86,625.00 101,068.00

28,875.00 17,325.00 28,875.00 17,325.00 57,750.00

14 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 472,500.00 11,550,000.00 288,750.00 1,575,000.00 1,026,380.00 2,625,000.00 3,675,000.00 78,750.00 36,750.00 162,910.00 63,000.00 5,512,500.00 4,200,000.00 1,439,550.00 580,100.00 36,750.00 Cek_Item Cek_Item Cek_Item Cek_Item 367,500.00 7,880.00 1,680,000.00 2,100,000.00 3,045,000.00 6,300,000.00 6,825,000.00 945,000.00 7,880.00 8,930.00 63,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 2,890.00 21,000.00 26,250.00 15,750.00 26,250.00 15,750.00 52,500.00 68,250.00

15 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 590,630.00 14,437,500.00 360,940.00 1,968,750.00 1,282,980.00 3,281,250.00 4,593,750.00 98,440.00 45,940.00 203,640.00 78,750.00 6,890,630.00 5,250,000.00 1,799,440.00 725,130.00 45,940.00 Cek_Item Cek_Item Cek_Item Cek_Item 459,380.00 9,850.00 2,100,000.00 2,625,000.00 3,806,250.00 7,875,000.00 8,531,250.00 1,181,250.00 9,850.00 11,160.00 78,750.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 3,610.00 26,250.00 32,810.00 19,690.00 32,810.00 19,690.00 65,630.00 85,310.00

16

7

8

475,000.00 1,250,000.00 850,000.00 75,000.00 250,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 350,000.00 5,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 350,000.00 12,500.00 325,000.00 445,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 17,000.00 20,000.00 13,500.00 15,000.00 -

9

1,200,000.00 900,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 7,500.00 10,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 25,000.00 25,000.00 15,000.00 20,000.00 -

10

550,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 15,000.00 8,000.00 11,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 22,000.00 20,000.00 -

11

-

12

1,600,000.00 1,100,000.00

Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

13

1,300,000.00 850,000.00

Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 17,000.00 13,500.00 12,500.00 -

14

15

550,000.00 1,200,000.00 850,000.00

Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

450,000.00 -

1,250,000.00 850,000.00 Cek_Item Cek_Item Cek_Item Cek_Item 1,350,000.00 650,000.00 5,000.00 Cek_Item Cek_Item Cek_Item Cek_Item 15,000.00 1,350,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 25,000.00 25,000.00 25,000.00 25,000.00 -

16

17

575,000.00 -

140,000.00

1,100,000.00 850,000.00

1,400,000.00 1,050,000.00 158,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 5,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 15,000.00 7,000.00 9,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 18,000.00 21,000.00 20,000.00 13,000.00 17,000.00 15,000.00 21,000.00 -

830,000.00 50,000.00

Cek_Item Cek_Item Cek_Item Cek_Item 4,000.00 Cek_Item Cek_Item Cek_Item Cek_Item 12,000.00 7,300.00 9,300.00 43,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 14,000.00 14,000.00 8,000.00 14,000.00 -

18

250,000.00 Cek_Item Cek_Item Cek_Item Cek_Item 10,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 15,500.00 12,500.00 12,500.00 28,000.00 -

19

1,250,000.00 850,000.00 Cek_Item Cek_Item Cek_Item Cek_Item 5,000.00 Cek_Item Cek_Item Cek_Item Cek_Item 15,000.00 8,000.00 10,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 17,500.00 17,500.00 17,500.00 -

17

179,025.00 184,800.00

866,250.00 57,750.00 23,100.00 40,425.00 11,550.00 14,058.00 173,250.00 25,993.00 20,218.00 5,775.00 20,218.00 404,250.00 28,875.00 259,875.00 34,650.00 86,625.00 167,475.00 86,625.00

97,020.00 288,750.00

14 84,000.00 173,250.00 28,880.00 126,000.00 28,880.00 89,250.00 84,000.00 189,000.00 178,500.00 28,880.00 13,130.00 18,380.00 105,000.00 120,750.00 787,500.00 945,000.00 315,000.00 183,750.00 168,000.00 210,000.00 315,000.00 105,000.00 162,750.00 168,000.00 168,000.00 157,500.00 18,380.00 32,810.00 19,690.00 15,750.00 420,000.00 367,500.00 787,500.00 10,500.00 131,250.00 787,500.00 262,500.00 52,500.00 21,000.00 36,750.00 7,880.00 10,500.00 26,250.00 12,780.00 157,500.00 73,500.00 23,630.00 18,380.00 5,250.00 18,380.00 367,500.00 26,250.00 236,250.00 31,500.00 78,750.00 152,250.00 210,000.00 78,750.00 52,500.00 288,750.00 84,000.00 88,200.00 120,750.00 262,500.00

15 105,000.00 216,560.00 36,100.00 157,500.00 36,100.00 111,560.00 105,000.00 236,250.00 223,130.00 36,100.00 16,410.00 22,980.00 131,250.00 150,940.00 984,380.00 1,181,250.00 393,750.00 229,690.00 210,000.00 262,500.00 393,750.00 131,250.00 203,440.00 210,000.00 210,000.00 196,880.00 22,980.00 41,010.00 24,610.00 19,690.00 525,000.00 459,380.00 984,380.00 13,130.00 164,060.00 984,380.00 328,130.00 65,630.00 26,250.00 45,940.00 9,850.00 13,130.00 32,810.00 15,980.00 196,880.00 91,880.00 29,540.00 22,980.00 6,560.00 22,980.00 459,380.00 32,810.00 295,310.00 39,380.00 98,440.00 190,310.00 262,500.00 98,440.00 65,630.00 360,940.00 105,000.00 110,250.00 150,940.00 328,130.00

16

7 20,000.00 20,000.00 20,000.00 25,000.00 12,500.00 15,000.00 7,500.00 35,000.00 7,500.00 235,000.00 14,000.00 150,000.00 10,000.00 50,000.00 30,000.00 42,500.00 300,000.00 150,000.00 185,000.00

8 -

9 -

10

10,000.00 10,000.00 12,000.00

-

10,000.00 15,000.00 -

5,000.00 5,000.00 -

250,000.00 16,000.00

6,000.00 185,000.00

-

15,000.00 10,000.00 15,000.00 300,000.00 15,000.00

-

-

11

150,000.00 55,000.00 -

3,500.00 -

30,000.00 30,000.00 50,000.00 300,000.00 150,000.00 -

12 -

15,000.00 20,000.00 8,500.00 10,000.00 6,500.00 5,000.00 255,000.00 15,000.00 110,000.00 85,000.00 75,000.00 -

15,000.00 20,000.00 5,000.00 250,000.00 15,000.00 27,500.00 -

13

14 135,000.00 150,000.00 150,000.00 110,000.00 450,000.00 25,000.00 15,000.00 -

15 25,000.00 25,000.00

150,000.00 30,000.00 15,000.00 10,000.00

235,000.00

-

5,000.00 45,000.00 185,000.00 -

-

-

50,000.00 160,000.00 325,000.00 30,000.00 165,000.00

5,000.00 7,000.00 -

10,000.00 36,000.00 5,000.00 3,000.00 250,000.00 15,000.00 100,000.00 15,000.00 65,000.00 150,000.00

-

20,000.00 25,000.00 -

15,000.00 22,000.00 8,000.00 10,000.00 36,000.00 8,000.00

5,000.00 10,000.00 5,000.00 3,000.00 260,000.00 12,500.00

10,000.00

20,000.00 -

-

-

16 -

17 -

125,000.00 5,000.00 3,000.00 2,000.00

225,000.00 5,000.00 -

45,000.00 25,000.00 60,000.00 75,000.00 -

50,000.00 -

75,000.00 -

18 -

19 22,500.00 25,000.00 22,500.00 22,500.00

25,000.00 27,500.00 32,000.00 22,500.00 10,000.00 20,000.00 10,000.00 15,000.00 8,000.00 8,000.00 15,000.00 30,000.00 6,000.00 22,000.00 70,000.00 300,000.00 -

15,000.00

-

15,000.00

12,000.00 -

27,500.00 30,000.00 30,000.00 15,000.00 -

8,000.00

350,000.00 130,000.00 135,000.00 -

17 462,000.00

12,705.00

20,218.00

103,950.00 115,500.00

40,425.00

51,975.00

643,130.00 511,880.00 459,380.00 538,130.00

0.00

14 420,000.00 63,000.00 13,130.00 105,000.00 63,000.00 11,550.00 12,600.00 5,250.00 26,250.00 18,380.00 31,500.00 57,750.00 84,000.00 115,500.00 81,380.00 89,250.00 94,500.00 63,000.00 94,500.00 105,000.00 47,250.00 60,380.00 81,380.00 36,750.00 36,960.00 15,750.00 47,250.00 38,540.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 643,130.00 511,880.00 459,380.00 538,130.00 1,398,600.00 52,500.00 33,600.00 6,238,050.00 62,380.00 5,780.00 240,980.00 1,050.00 5,250.00 1,260.00 11,390.00 12,600.00 630.00 198,450.00 2,390.00 26,250.00 15,750.00 40,430.00 157,500.00 52,500.00 47,250.00 445,250.00 750,750.00

15 525,000.00 78,750.00 16,410.00 131,250.00 78,750.00 14,440.00 15,750.00 6,560.00 32,810.00 22,980.00 39,380.00 72,190.00 105,000.00 144,380.00 101,730.00 111,560.00 118,130.00 78,750.00 118,130.00 131,250.00 59,060.00 75,480.00 101,730.00 45,940.00 46,200.00 19,690.00 59,060.00 48,180.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 803,910.00 639,850.00 574,230.00 672,660.00 1,748,250.00 65,630.00 42,000.00 7,797,560.00 77,980.00 7,230.00 301,230.00 1,310.00 6,560.00 1,580.00 14,240.00 15,750.00 790.00 248,060.00 2,990.00 32,810.00 19,690.00 50,540.00 196,880.00 65,630.00 59,060.00 556,560.00 938,440.00

16 -

-

-

-

7 7,500.00 75,000.00 11,000.00 15,000.00 70,000.00 85,000.00 135,000.00 82,500.00 70,000.00 80,000.00 53,500.00 70,000.00 85,000.00 26,500.00 -

8

9 -

80,000.00 135,000.00 -

10 75,000.00 -

90,000.00 128,000.00 85,000.00 -

52,000.00 90,000.00 28,500.00 -

11 -

-

60,000.00 85,000.00 135,000.00 115,000.00 125,000.00 55,000.00 68,000.00 85,000.00 20,000.00 -

75,000.00 16,000.00 65,000.00 80,000.00 135,000.00 82,500.00 -

51,000.00 65,000.00 80,000.00 25,000.00 -

12

13 -

14 -

65,000.00 11,000.00 -

-

130,000.00 70,000.00 82,500.00 132,500.00

69,000.00 82,000.00 128,000.00 80,000.00

67,500.00 80,000.00 53,000.00 70,000.00 82,500.00 -

222,000.00 66,000.00 80,000.00 52,000.00 69,000.00 82,000.00 -

17,500.00 77,500.00 15,000.00 12,500.00 27,500.00 17,500.00 72,500.00 85,000.00 135,000.00 95,000.00 85,000.00 95,000.00 53,000.00 72,500.00 85,000.00 15,000.00 -

15 100,000.00 70,000.00 73,000.00 89,000.00 142,000.00 88,000.00 247,000.00 75,000.00 90,000.00 56,000.00 73,000.00 89,000.00 13,000.00 -

16

17

70,000.00 -

-

18 145,000.00 82,000.00

12,000.00 14,000.00 65,000.00 78,000.00 110,000.00 70,000.00 53,000.00 65,000.00 78,000.00 -

15,000.00 15,000.00 120,000.00 52,000.00 10,000.00 -

19

70,000.00 10,000.00 12,500.00 12,500.00

15,000.00 70,000.00 90,000.00 140,000.00 55,000.00 54,000.00 74,000.00 20,000.00

14,000.00 -

17

14 967,890.00 47,250.00 6,350.00 288,750.00 1,260,000.00 1,260,000.00 1,080,240.00 282,660.00 282,660.00 35,810.00 70,880.00 637,880.00 42,000.00 47,250.00 52,500.00 57,750.00 47,250.00 63,790.00 28,350.00 2,394.00 120,490.00 40,430.00 86,520.00 203,860.00 271,950.00 185,330.00 240,980.00 39,760.00 425,250.00 86,420.00 20,210.00 1,980,000.00 1,800,000.00 52,500.00 78,750.00 148,995,000.00 135,450,000.00 168,052,500.00 152,775,000.00 214,830,000.00 195,300,000.00 272,002,500.00 247,275,000.00 291,060,000.00 264,600,000.00 332,640,000.00 302,400,000.00 166,110.00 212,310.00 13,230.00 17,330.00 190,580.00 0.00 Cek_Item 1,700.00 1,260.00 0.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 11,700.00 Cek_Item 12,815.00 Cek_Item 0.00 Cek_Item 0.00 Cek_Item 0.00 Cek_Item 0.00 Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item

15 1,209,860.00 59,060.00 7,940.00 360,940.00 1,575,000.00 1,575,000.00 1,350,300.00 353,330.00 44,760.00 88,600.00 797,350.00 52,500.00 59,060.00 65,630.00 72,190.00 59,060.00 79,740.00 35,440.00 2,394.00 150,610.00 50,540.00 108,150.00 254,830.00 339,940.00 231,660.00 301,230.00 49,700.00 531,560.00 108,030.00 25,260.00 1,800,000.00 65,630.00 98,440.00 169,312,500.00 190,968,750.00 244,125,000.00 309,093,750.00 330,750,000.00 378,000,000.00 207,640.00 265,390.00 16,540.00 21,660.00 238,230.00 Cek_Item 1,580.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item

16

7

8

9

10

11

12

13

14

15

16

17

18

19

17 14 #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item

15 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item

#VALUE! Cek_Item

Cek_Item

#VALUE! Cek_Item

Cek_Item

#VALUE! Cek_Item

Cek_Item

#VALUE! Cek_Item

Cek_Item

#VALUE! Cek_Item

Cek_Item

#VALUE! Cek_Item

Cek_Item

#VALUE! Cek_Item

Cek_Item

#VALUE! Cek_Item

Cek_Item

#VALUE! Cek_Item

Cek_Item

#VALUE! Cek_Item

Cek_Item

#VALUE! Cek_Item

Cek_Item

#VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item

Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item

#VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item 0.00 Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item #VALUE! Cek_Item 20,000.00 Cek_Item 0.00

Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item

2,000.00

16

7

0.00

8

-

9

-

10

-

11

-

12

-

13

-

14

-

15

-

16

-

17

-

18

-

19

-

PAAL II

20 Cek_Item Cek_Item Cek_Item Cek_Item 8,500.00 11,800.00 35,000.00 Cek_Item Cek_Item 7,500.00

TOKO BANGUN UTAMA

21 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

MALALAYAN G INDAH

22 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

BANGUNAN JAYA

23 Cek_Item Cek_Item Cek_Item Cek_Item 3,500.00 Cek_Item Cek_Item -

PT. PPI CABANG MANADO

KALPATARE

24 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

25

WIJAYA KOMBOS INDAH

26 11,130.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

20 11,450.00 -

21

22 -

1,700.00 5,000.00 -

1,900.00 2,400.00 11,000.00 -

70,000.00 95,000.00 -

-

20,000.00 27,500.00

18,000.00

-

25,000.00 -

35,000.00

13,000.00

-

25,000.00

17,500.00

-

14,000.00 -

22,000.00 19,000.00

20,000.00 20,000.00

-

1,700.00 5,000.00 10,000.00 -

19,000.00 24,000.00

18,500.00 67,500.00

-

24 -

3,000.00 5,000.00 12,000.00

60,000.00 60,000.00 65,000.00 110,000.00 55,000.00 110,000.00 120,000.00 190,000.00 160,000.00 -

-

-

23 -

-

22,500.00 30,000.00 -

-

20,000.00 70,000.00 35,000.00 40,000.00 30,000.00 16,000.00 21,000.00 21,000.00 -

25 -

385,000.00 650,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 25,000.00 25,000.00 20,000.00 20,000.00 -

26 82,500.00 120,000.00 12,000.00 30,500.00 47,000.00 50,500.00 87,000.00 168,500.00 9,750.00 995,000.00 330,000.00 590,000.00 12,000.00 220,000.00 310,000.00 120,000.00 52,500.00 26,500.00 257,000.00 414,500.00 10,000.00 20,000.00 20,000.00 310,000.00 -

20 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

21

22

-

-

26,000.00 73,000.00 105,000.00 130,000.00 175,000.00 Cek_Item 175,000.00 Cek_Item Cek_Item Cek_Item 105,000.00 57,500.00 33,000.00 50,000.00 105,000.00 176,000.00 Cek_Item 35,000.00 20,000.00 60,000.00 2,300,000.00 35,000.00

25,000.00 70,000.00 105,000.00 140,000.00 180,000.00 Cek_Item Cek_Item Cek_Item 37,500.00 Cek_Item 3,500.00 130,000.00 55,000.00 32,500.00 250,000.00 110,000.00 40,000.00 180,000.00 75,000.00 32,500.00 32,500.00 Cek_Item 35,000.00 22,500.00 7,500.00 42,500.00 50,000.00 47,500.00 -

23 -

24

31,000.00 67,000.00 95,000.00

Cek_Item Cek_Item Cek_Item 21,000.00 37,000.00 Cek_Item 5,000.00 115,000.00 60,000.00 30,000.00 95,000.00 40,000.00 180,000.00 70,000.00 33,000.00 Cek_Item 35,000.00 21,000.00 10,000.00 45,000.00 45,000.00 17,500.00 -

67,500.00 92,500.00 175,000.00 27,500.00 Cek_Item 135,000.00 176,000.00 Cek_Item Cek_Item Cek_Item 129,000.00 57,500.00 32,500.00 50,000.00 240,000.00 110,000.00 176,000.00 32,500.00 35,000.00 Cek_Item 35,000.00 20,000.00 60,000.00 10,000.00 9,500,000.00 9,500,000.00 5,000,000.00 2,500,000.00 1,550,000.00 35,000.00

25 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

26 24,500.00 61,500.00 89,500.00 131,500.00 161,000.00 Cek_Item 105,000.00 161,000.00 234,000.00 Cek_Item 307,500.00 Cek_Item Cek_Item 66,000.00 Cek_Item 5,000.00 75,000.00 -

20 Cek_Item -

21 90,000.00 30,000.00 Cek_Item 55,000.00 47,000.00 75,000.00 25,000.00 15,000.00 20,000.00 25,000.00 -

22 Cek_Item 52,500.00 55,000.00 42,500.00 45,000.00 57,500.00 60,000.00 -

23 Cek_Item 53,000.00 53,000.00 -

24 90,000.00 31,000.00 Cek_Item 40,000.00 32,500.00 1,600,000.00 75,000.00 55,000.00 67,500.00 57,500.00 75,000.00 42,000.00 45,000.00 68,000.00 78,000.00 95,000.00 72,500.00 165,000.00 68,000.00 72,500.00 75,000.00 95,000.00 185,000.00 -

25 Cek_Item -

26 79,500.00 30,000.00 Cek_Item 31,500.00 28,000.00 33,000.00 70,000.00 40,750.00 49,000.00 59,000.00 -

20 -

21 -

22

65,000.00 270,000.00 2,500,000.00

-

-

-

17,500.00 400,000.00 130,000.00 15,000.00 22,500.00 135,000.00 80,000.00 100,000.00 95,000.00 55,000.00 -

23

24 65,000.00 75,000.00 77,000.00 77,000.00 500,000.00 800,000.00 265,000.00 2,400,000.00

15,000.00 32,000.00 185,000.00 115,000.00 350,000.00 600,000.00 155,000.00 -

25 -

26 183,500.00 99,000.00 328,000.00 553,500.00 137,500.00 89,000.00 54,500.00

20 -

21 -

37,500.00 64,500.00 82,500.00

-

20,000.00 162,000.00 27,000.00 268,000.00

22 170,000.00 75,000.00 35,000.00 50,000.00 65,000.00 20,000.00 150,000.00 27,500.00 240,000.00 -

23

24 47,500.00 135,000.00 75,000.00 37,000.00 65,000.00 75,000.00 27,500.00 52,500.00 65,000.00 155,000.00 27,500.00 255,000.00

25 -

26 171,500.00 375,000.00 68,500.00 53,500.00 32,500.00 113,000.00 256,500.00 42,000.00 25,000.00 42,500.00 53,500.00 37,500.00 13,000.00 108,000.00 18,000.00 178,000.00

20

21

22

23

24

25

26

20

21

22

23

24

25

26

20

21

22

23

24

25

26

20

21

22

23

24

25

26

20

Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

21

-

22

1,600,000.00 1,100,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 295,000.00 405,000.00 Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item 17,500.00 20,000.00 15,000.00 15,000.00 -

23

24

Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

25

Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

26

Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item Cek_Item -

20 -

21 -

22 -

-

23 -

15,000.00 20,000.00 6,500.00 7,500.00 25,000.00 6,000.00 3,500.00 6,000.00 -

12,500.00 -

25,000.00 30,000.00 6,000.00

6,000.00 225,000.00 12,000.00 135,000.00 35,000.00

60,000.00 350,000.00 27,500.00 -

24 -

25 -

26 -

20 -

21 -

22 -

85,000.00 -

70,000.00 83,000.00 135,000.00

-

-

-

55,000.00 70,000.00 85,000.00 15,000.00 -

23

75,000.00 15,000.00 70,000.00 85,000.00 135,000.00

68,000.00 85,000.00 135,000.00 95,000.00

54,000.00 70,000.00 -

24 68,000.00 82,500.00 13,500.00 80,000.00 -

53,000.00

52,000.00 68,000.00 80,000.00 15,000.00

15,000.00 -

-

25 -

26 66,000.00 126,000.00 95,000.00 61,000.00 72,000.00 50,000.00 65,000.00 77,500.00 -

20

21

22

23

24

25

26

20

-

21

-

22

-

23

-

24

-

25

-

26

-

LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANADO Nomor Tanggal Tentang

: : : Penetapan Standarisasi Harga Satuan Jadi di lingkungan Dinas Pekerjaan Umum Kota Manado 2016

DAFTAR HARGA SATUAN UPAH

NO.

JENIS UPAH

HARGA per JAM Satuan (Rp.)

HARGA per HAR Satuan

1

Pekerja

Jam / Org

12,500.00

Hari / Org

2

Mandor

Jam / Org

15,000.00

Hari / Org

3

Tukang Batu

Jam / Org

15,625.00

Hari / Org

4

Tukang Besi

Jam / Org

15,625.00

Hari / Org

5

Tukang Cat

Jam / Org

15,625.00

Hari / Org

6

Tukang Las

Jam / Org

15,625.00

Hari / Org

7

Tukang

Jam / Org

15,625.00

Hari / Org

8

Tukang Kayu

Jam / Org

15,625.00

Hari / Org

9

Kepala Tukang

Jam / Org

18,750.00

Hari / Org

10

Instalatur

Jam / Org

18,750.00

Hari / Org

11

Mekanik/ Sopir

Jam / Org

18,750.00

Hari / Org

12

Operator/Masinis

Jam / Org

18,750.00

Hari / Org

13

Pembantu Operator / Mekanik

Jam / Org

15,625.00

Hari / Org

14

Pembantu Tukang / Penjaga

Jam / Org

15,625.00

Hari / Org

Catatan :

Satuan Jadi 2016

80 dari 266

- Sesuai harga yang berlaku dipasaran. - Harga satuan belum termasuk pajak yang berlaku. - Harga sewaktu-waktu bisa berubah

Menyetujui, Plt. KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

Dibuat Oleh, CV. DAYA ABADI GEMILANG

Ir. FERRY T. SIWI, M.Si

ANNEKE I UNTU, ST

NIP. 19590626 199103 1 008

Direktur

Satuan Jadi 2016

81 dari 266

MUM KOTA MANADO

HARGA per HARI (Rp.)

KET.

100,000.00 120,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 150,000.00 150,000.00 150,000.00 150,000.00 125,000.00 125,000.00

Satuan Jadi 2016

82 dari 266

YA ABADI GEMILANG

NEKE I UNTU, ST

Satuan Jadi 2016

83 dari 266

LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANADO Nomor Tanggal Tentang

: : : Penetapan Standarisasi Harga Satuan Jadi di lingkungan Dinas Pekerjaan Umum Kota Manado 2016

DAFTAR HARGA SATUAN UPAH (SWAKELOLA)

NO.

JENIS UPAH

HARGA per JAM Satuan (Rp.)

HARGA per HARI Satuan

1

Pekerja

Jam / Org

12,500.00

Hari / Org

2

Mandor

Jam / Org

15,000.00

Hari / Org

3

Tukang Batu

Jam / Org

15,625.00

Hari / Org

4

Tukang Besi

Jam / Org

15,625.00

Hari / Org

5

Tukang Cat

Jam / Org

15,625.00

Hari / Org

6

Tukang Las

Jam / Org

15,625.00

Hari / Org

7

Tukang

Jam / Org

15,625.00

Hari / Org

8

Tukang Kayu

Jam / Org

15,625.00

Hari / Org

9

Kepala Tukang

Jam / Org

18,750.00

Hari / Org

10

Instalatur

Jam / Org

18,750.00

Hari / Org

11

Mekanik/ Sopir

Jam / Org

18,750.00

Hari / Org

12

Operator/Masinis

Jam / Org

18,750.00

Hari / Org

13

Pembantu Operator / Mekanik

Jam / Org

15,625.00

Hari / Org

14

Pembantu Tukang / Penjaga

Jam / Org

15,625.00

Hari / Org

416470983.xlsx UPAH swakel

84 dari 266

Catatan : - Sesuai harga yang berlaku dipasaran. - Harga satuan belum termasuk pajak yang berlaku. - Harga sewaktu-waktu bisa berubah

Menyetujui, Plt. KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

Dibuat Oleh, CV. DAYA ABADI GEMILANG

Ir. FERRY T. SIWI, M.Si

ANNEKE I UNTU, ST

NIP. 19590626 199103 1 008

Direktur

416470983.xlsx UPAH swakel

85 dari 266

MUM KOTA MANADO

OLA) HARGA per HARI (Rp.)

KET.

100,000.00 120,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 125,000.00 150,000.00 150,000.00 150,000.00 150,000.00 125,000.00 125,000.00 416470983.xlsx UPAH swakel

86 dari 266

YA ABADI GEMILANG

NEKE I UNTU, ST

416470983.xlsx UPAH swakel

87 dari 266

LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANADO Nomor Tanggal Tentang

: : : Penetapan Standardisasi Harga Satuan Jadi : di lingkungan Dinas Pekerjaan Umum Kota Manado T.A. 2016

DAFTAR HARGA SATUAN BAHAN NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Satuan Jadi 2016

JENIS BAHAN Agregat Base Kelas A Agregat Base Kelas B Agregat Base Kelas C Agregat Halus Agregat Kasar Air Alang-alang Aspal Aspal Hotmix (Ready Mix) Bata merah Batako Uk. 20 x 40 x 10 Batu Alam 10 x 20 Batu apung Batu Bata Klinker Uk. 5 x 5 x 25 Batu Belah / Batu Kali / Batu Gunung Batu Belah Uk. 15 - 20 Batu Boulder Batu Bunga (Alam) Batu Candi 10 x 20 Batu Candi 30 x 30 Batu Green Bally 15 x 30 Batu Green Bally 20 x 40 Batu Palimanan 10 x 20 Batu Palimanan 15 x 30 Batu Palimanan 20 x 40 Batu Palimanan 30 x 30 Batu Pecah Uk. 0,5 - 1 Batu Pecah Uk. 1 - 3 Batu Pecah Uk. 3 - 5 Batu Pecah Uk. 5 - 7 Batu Sukabumi 10 x 20 Batu Sukabumi 15 x 15

SATUAN M³ M³ M³ M³ M³ Ltr Ikat Kg Ton Bh Bh M² Kg Bh M³ M³ M³ M² M² M² M² M² M² M² M² M² M³ M³ M³ M³ M² M²

Halaman 88 dari 266 halaman

NO. 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75

Satuan Jadi 2016

JENIS BAHAN Bensin / Premium (HET) Bensin / Premium (Industri) Butonite Patch Cansteen Gebalan Rumput Geotextile Hollow Brick Ijuk Kapur Padam Kapur sirih Karet Elastomer Kerikil Beton Kerikil Koral Uk. 1 - 3 cm Koral Sikat 2 - 3 cm Koral Sikat Panca Warna Minyak Bekisting Minyak Pelumas / Oli (Pertamina) Minyak Pelumas / Oli (Shell) Minyak Tanah / Kerosine (Industri) Pasir Kasar/ Urug Pasir Pasang / Beton Pasir Pasang (Sedang) Paving Stone t=6 cm Paving Stone t=8 cm S o l a r (HET) S o l a r (Industri) Semen PC Semen Putih Semen Warna Sirtu Alam Storox-100 Tanah Biasa Tanah Liat Tanah Pilihan Trihex Paving Besi Hollow 2 x 4 cm Besi Hollow 4 x 4 cm Besi Profil Besi Siku 3 x 3 x 2 Besi Siku 3 x 3 x 3 Besi Siku 4 x 4 x 3 Besi Siku 4 x 4 x 4 Besi Siku 5 x 5 x 5

SATUAN Ltr Ltr Kg Bh M² M¹ Bh Kg M³ Kg Bh M³ M³ Kg Kg Ltr Ltr Ltr Ltr M³ M³ M³ Bh Bh Ltr Ltr Kg Kg Kg M³ Kg M³ M³ M³ Bh M¹ M¹ Kg M¹ M¹ M¹ M¹ M¹

Halaman 89 dari 266 halaman

NO. 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118

Satuan Jadi 2016

JENIS BAHAN Besi Stainlessteel 1/2" Besi Stainlessteel 3/4" Besi Stainlessteel 1" Besi Stainlessteel 1 1/4" Besi Stainlessteel 1 1/2" Besi Stainlessteel 2" Besi Stainlessteel 3" Besi Stainlessteel 4" Besi strip Besi Warmesh θ 10 Besi Warmesh θ 6 Besi Warmesh θ 8 Bois Beton dia. 100 cm (pakai tulangan) Bois Beton dia. 100 cm (tanpa tulangan) Bois Beton dia. 150 cm (pakai tulangan) Bois Beton dia. 150 cm (tanpa tulangan) Bois Beton dia. 60 cm (pakai tulangan) Bois Beton dia. 60 cm (tanpa tulangan) Bois Beton dia. 80 cm (pakai tulangan) Bois Beton dia. 80 cm (tanpa tulangan) Kawat baja Kawat Beronjong Kawat Beronjong (Jadi) dia. 2,7 mm ( 2 x 1 x 0,5 ) Kawat Beronjong (Jadi) dia. 2,7 mm ( 3 x 1 x 0,5 ) Kawat Beronjong (Jadi) dia. 3,0 mm ( 2 x 1 x 0,5 ) Kawat Beronjong (Jadi) dia. 3,0 mm ( 3 x 1 x 0,5 ) Kawat Beton / Bendrat Kawat Duri Kawat jaring galvanis Kawat Las Pagar BRC (BRC Fence) ; tinggi = 120 cm Pagar BRC (BRC Fence) ; tinggi = 175 cm Pagar BRC (BRC Fence) ; tinggi = 90 cm Paku Asbes Bh Paku Beton Paku Genteng Metal Paku Kayu 2" s/d 6" Paku pancing Paku Reng Paku Sekrup Paku Seng Paku Tripleks Pintu gulung besi

SATUAN M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ Kg Unit Unit Unit Bh Bh Bh Bh Bh Bh Bh Bh Kg Kg M³ M³ M³ M³ Kg Kg M¹ Kg M¹ M¹ M¹ Bh Kg Kg Kg Kg Kg Kg Kg Kg M²

Halaman 90 dari 266 halaman

NO. 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161

Satuan Jadi 2016

JENIS BAHAN Plat Rambu Profil alumunium "T" Rel Pengaman (Guard Rail) Rolling Door Sekrup fixer Sekrup Galbani Besi Beton Polos Besi Beton Polos dia. 6 mm Besi Beton Polos dia. 10 mm Besi Beton Polos dia. 12 mm Besi Beton Polos dia. 14 mm Besi Beton Polos dia. 16 mm Besi Beton Ulir Besi Beton Ulir dia. 14 mm Besi Beton Ulir dia. 16 mm Besi Beton Ulir dia. 18 mm Besi Beton Ulir dia. 20 mm Besi Beton Ulir dia. 22 mm Besi Beton Ulir dia. 24 mm Beton Roster Uk. 20x20 cm Beton Roster Uk. 20x40 cm Ijuk Residu Roster Kaca Uk. 20x20 cm Roster Uk. 20x20 cm (keramik) Roster Uk. 40x40 cm (keramik) Tali ijuk Ampelas Cat Dasar /Alkali (Dulux/ Setara) Cat Kayu/Besi Mengkilap (Glotex/ Seiv/ Setara) Cat Marka Cat Menie Kayu/Besi/Seng (Glotex Setara) Cat Multiguard Cat Tembok (Dulux/ICI setara) Cat Tembok (Metrolite/ Catylac/ Setara) Cat Tembok Biasa Cat Waterproofing (Setara Aquaproof) Chipping Compound Gypsum Dempul Besi Dempul Kayu/Wood Filler (Impra Setara) Kuas Lem Eha-Bond

SATUAN Bh M¹ M¹ M² Bh Bh Kg Ujung Ujung Ujung Ujung Ujung Kg Ujung Ujung Ujung Ujung Ujung Ujung Bh Bh M³ Lt Bh Bh Bh Kg Lbr Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Bh Ltr

Halaman 91 dari 266 halaman

NO. 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204

Satuan Jadi 2016

JENIS BAHAN Minyak Cat / Thiner Paper Tape Plamir Plamur Tembok (Danapaint Setara) Politur Sherlak Soda api Spiritus Teak oil Kaca One Way 10 mm Kaca One Way 5 mm Rangka Aluminium 3" coklat Rangka Aluminium 3" Silver Rangka Aluminium 4" coklat Rangka Aluminium 4" Silver Kayu Bakar Kayu Kelas I (Kayu Besi, dll.) Kayu Kelas I (Kayu Linggua,dll.) Kayu Kelas II (Kayu Cempaka, dll.) Kayu Kelas III (Kayu Nantu, dll.) Kayu Kelas IV (Kayu Telon, dll.) Perancah kayu Asbes Gelombang Besar Asbes Gelombang Kecil Atap alumunium gelombang tebal 0.55 mm Atap Genteng Metal (setara Multi Roof) Atap Genteng Metal (setara Sakura Roof:80 cmX 80 cm) Atap Onduline Gelombang 0.95 * 1.95 M Atap Spandek Bubungan Genteng Metal (setara Multi Roof) Bubungan Genteng Metal (setara Sakura Roof) Eternit (Asbes) Flashing Genteng Metal (setara Multi Roof) Flashing Genteng Metal (setara Sakura Roof) Genteng (setara Genteng Kodok) Genteng Aspal Genteng Beton Genteng Kaca Genteng Keramik Genteng Sirap Karpus Asbes Gelombang Besar Karpus Asbes Gelombang Kecil Karpus Genteng (setara Genteng Kodok)

SATUAN Ltr M¹ Kg Kg Ltr Kg Kg Ltr Ltr M² M2 Ujg Ujg Ujg Ujg M³ M³ M³ M³ M³ M³ M³ Lbr Lbr M² M² M² M² Ujg Bh Bh M² M¹ M¹ Bh Lbr Lbr Bh Bh Bh Lbr Lbr Bh

Halaman 92 dari 266 halaman

NO. 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247

Satuan Jadi 2016

JENIS BAHAN Karpus Genteng Beton Karpus Genteng Keramik Kaso 3/5 Nok alumunium standar 40 cm 18, swg 22 Nok genteng beton Nok Samping Genteng Metal (setara Multi Roof) Nok Samping Genteng Metal (setara Sakura Roof) Policarbonate Seng Fiberglass Seng Gelombang Alluminium 0,25 mm Seng Gelombang Alluminium 0,30 mm Seng Plat Alluminium 0,25 mm Seng Plat Alluminium 0,30 mm Seng Fiberglass Laserlite Plus (uk. 180 x 86 x 0,9 cm) Seng Gelombang BJLS 20 Seng Gelombang BJLS 24 Seng Gelombang BJLS 25 Seng Gelombang BJLS 30 (uk. 180 x 90 x 0,3 cm) Seng Plat BJLS 20 Seng Plat BJLS 25 Seng Plat BJLS 30 (uk. 91,4 x 182,9 cm) Internal cove artistik (5 x5x20) cm Marmer Plint keramik arttistik uk. 10 x 10 cm Plint keramik arttistik uk. 10 x 20 cm Shower Screen Aluminium Tegel Abu-Abu uk. 20x20 cm Tegel Abu-Abu uk. 30x30 cm Tegel Abu-Abu uk. 40x40 cm Tegel Berwarna uk. 20x20 cm Tegel Berwarna uk. 30x30 cm Tegel Berwarna uk. 40x40 cm Tegel Esenza uk. 40x40 cm Tegel granite dinding 20 x 20 Tegel granite dinding 25 x 50 Tegel granite dinding 25 x 60 Tegel granite dinding 30 x 30 Tegel granite dinding 30 x 60 Tegel granite lantai 20 x 20 Tegel granite lantai 30 x 30 Tegel granite lantai 40 x 40 Tegel granite lantai 50 x 50 Tegel granite lantai 60 x 60

SATUAN Bh Bh Btg Lbr Bh Bh Bh M² Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

Halaman 93 dari 266 halaman

NO. 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290

Satuan Jadi 2016

JENIS BAHAN Tegel granite lantai 80 x 80 Tegel Granito uk. 30x30 cm Tegel Granito uk. 40x40 cm Tegel Keramik uk. 10x20 cm Tegel Keramik uk. 10x33 cm Tegel Keramik uk. 11x11 cm Tegel Keramik uk. 15x15 cm Tegel Keramik uk. 15x20 cm Tegel Keramik uk. 20x20 cm Tegel Keramik uk. 20x25 cm Tegel Keramik uk. 25x25 cm Tegel Keramik uk. 30x30 cm Tegel Keramik uk. 30x30 cm antislip Tegel Keramik uk. 33x33 cm Tegel Keramik uk. 33x33 cm anti slip Tegel Keramik uk. 40x40 cm anti slip Tegel mosaik 30 x 30 cm, ex lokal Tegel Plint granito uk. 10x30 cm Tegel Plint granito uk. 10x40 cm Tegel Plint granito uk. 15x30 cm Tegel Plint pc abu-abu uk. 15x30 cm Tegel Plint pc abu-abu uk. 10x30 cm Tegel Plint pc abu-abu uk. 10x40 cm Tegel Plint pc warna uk. 10x40 cm Tegel Plint teralux kerang uk. 10x30 cm Tegel Plint teralux kerang uk. 10x40 cm Tegel Plint teralux kerang uk. 15x30 cm Tegel Plint teralux marmer uk. 10x30 cm Tegel Plint teralux marmer uk. 10x40 cm Tegel Plint teralux marmer uk. 10x60 cm Tegel Plint Teraso uk. 10x30 cm Tegel Plint Teraso uk. 10x40 cm Tegel Plint Teraso uk. 15x30 cm Tegel Plint warna uk. 10x20 cm Tegel Porselin putih uk. 11x11 cm Tegel teralux kerang uk. 30 x 30 cm Tegel teralux kerang uk. 40 x 40 cm Tegel teralux marmer uk. 40 x 40 cm Tegel teralux marmer uk. 60 x 60 cm Tegel Wafel uk. 20x20 cm Ubin keramik arttistik uk. 10 x 10 cm Ubin keramik arttistik uk. 10 x 20 cm Ubin keramik arttistik uk. 15 x 15 cm

SATUAN Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

Halaman 94 dari 266 halaman

NO. 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333

Satuan Jadi 2016

JENIS BAHAN Ubin keramik arttistik uk. 5 x 20 cm Ubin tahan asam Bak Cuci Stainless Steel (1 Lobang) Bak Cuci Stainless Steel (2 Lobang) Bak Mandi Fiberglass Bathub Biofill BF 8 Floor Drain Jet Pump Grundfos; Head 50 m; kap. 72 l/dt Jet Pump; Head 30 m; kap. 30 l/dt Kitchen Set Kloset Duduk Keramik Standar Kloset Jongkok Keramik Standar Kloset Monoblok Lokal Mata Kran Standar 1/2" Mata Kran Standar 3/4" Pipa Galvanis (medium A) dia. 1" Pipa Galvanis (medium A) dia. 1/2" Pipa Galvanis (medium A) dia. 2" Pipa Galvanis (medium A) dia. 3" Pipa Galvanis (medium A) dia. 3/4" Pipa Galvanis (medium B) dia. 1" Pipa Galvanis (medium B) dia. 1/2" Pipa Galvanis (medium B) dia. 2" Pipa Galvanis (medium B) dia. 3" Pipa Galvanis (medium B) dia. 3/4" Pipa Galvanis Light (biasa) dia. 1" Pipa Galvanis Light (biasa) dia. 1/2" Pipa Galvanis Light (biasa) dia. 2" Pipa Galvanis Light (biasa) dia. 3" Pipa Galvanis Light (biasa) dia. 3/4" Pipa Polyethylene (PE) dia. 1" Pipa Polyethylene (PE) dia. 3/4" Pipa Polyteline PE dia. 1 1/2" Pipa Porous Pipa PVC dia. 1" AW Pipa PVC dia. 1,5" AW Pipa PVC dia. 2" AW Pipa PVC (S-12,5) dia. 1/2" AW Pipa PVC (S-12,5) dia. 3/4" AW Pipa PVC dia. 1 1/4" AW Pipa PVC dia. 1/2" AW Pipa PVC dia. 3" AW

SATUAN Bh M² Bh Bh Bh Bh Bh Bh Unit Unit M¹ Bh Bh Bh Bh Bh M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹ M¹

Halaman 95 dari 266 halaman

NO. 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376

Satuan Jadi 2016

JENIS BAHAN Pipa PVC dia. 3/4" AW Pipa PVC dia. 4" AW Pipa GIP (Medium SII) Ø 12" Pipa GIP (Medium SII) Ø 10" Pipa GIP (Medium SII) Ø 8" Pipa GIP (Medium SII) Ø 6" Pipa GIP (Medium SII) Ø 4" Pipa GIP (Medium SII) Ø 3" Pipa GIP (Medium SII) Ø 2" Pipa PVC S-10 Ø 12" RR Pipa PVC S-10 Ø 10" RR Pipa PVC S-10 Ø 8" RR Pipa PVC S-10 Ø 6" RR Pipa PVC S-10 Ø 4" RR Pipa PVC S-10 Ø 3" RR Pipa PVC S-10 Ø 2" RR Pipa PVC S-10 Ø 1½" SC Pipa PVC S-10 Ø 1" SC Pipa PVC S-10 Ø 3/4" SC Pipa PVC S-10 Ø 1/2" SC Pipa PVC S-12,5 Ø 12" RR Pipa PVC S-12,5 Ø 10" RR Pipa PVC S-12,5 Ø 8" RR Pipa PVC S-12,5 Ø 6" RR Pipa PVC S-12,5 Ø 4" RR Pipa PVC S-12,5 Ø 3" RR Pipa PVC S-12,5 Ø 2" RR Pipa PVC S-12,5 Ø 1½" SC Pipa PVC S-12,5 Ø 1" SC Pipa PVC S-12,5 Ø 3/4" SC Pipa PVC S-12,5 Ø 1/2" SC Pipa PE S8-SDR17 (PN10) Ø 12" (315 mm) Pipa PE S8-SDR17 (PN10) Ø 10" (250 mm) Pipa PE S8-SDR17 (PN10) Ø 8" (200 mm) Pipa PE S8-SDR17 (PN10) Ø 6" (160 mm) Pipa PE S8-SDR17 (PN10) Ø 4" (110 mm) Pipa PE S8-SDR17 (PN10) Ø 3" (90 mm) Pipa PE S8-SDR17 (PN10) Ø 2" (63 mm) Pipa PE S8-SDR17 (PN10) Ø 1½" (50 mm) Pipa PE S8-SDR17 (PN10) Ø 11/4" (40 mm) Pipa PE S8-SDR17 (PN10) Ø 1" (32 mm) Pipa PE S8-SDR17 (PN10) Ø ¾" (25 mm) Pipa PE S8-SDR17 (PN10) Ø ½" (20 mm)

SATUAN M¹ M¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹ m¹

Halaman 96 dari 266 halaman

NO. 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419

Satuan Jadi 2016

JENIS BAHAN Pipa PE S8-SDR17 (PN10) Ø 1½" (50 mm) Pipa PE S8-SDR17 (PN10) Ø 1" (32 mm) Pipa PE S8-SDR17 (PN10) Ø 3/4" (25 mm) Pipa PE S8-SDR17 (PN10) Ø 1/2" (20 mm) Accessories Gate Valve Double Flanged CI Ø 2" Accessories Gate Valve Double Flanged CI Ø 3" Accessories Gate Valve Double Flanged CI Ø 4" Accessories Gate Valve Double Flanged CI Ø 6" Accessories Gate Valve Double Flanged CI Ø 8" Accessories Gate Valve Double Flanged CI Ø 10" Accessories Gate Valve Double Flanged CI Ø 12" Accessories Stop Kran Ø 100 mm Accessories Stop Kran Ø 75 mm Accessories Stop Kran Ø 50 mm Accessories Stop Kran Ø 25 mm Accessories Stop Kran Ø 20 mm Accessories Check Valve (Non Return Valve) Ø 4" Accessories Check Valve (Non Return Valve) Ø 6" Accessories Check Valve (Non Return Valve) Ø 8" Accessories Check Valve (Non Return Valve) Ø 10" Accessories Check Valve (Non Return Valve) Ø 12" Accessories DF. Water Meter Ø 1/2" Accessories DF. Water Meter Ø 2" Accessories DF. Water Meter Ø 3" Accessories DF. Water Meter Ø 4" Accessories DF. Water Meter Ø 6" Accessories DF. Water Meter Ø 8" Accessories DF. Water Meter Ø 10" Accessories DF. Water Meter Ø 12" Accessories Flanged Air Relief Valve Ø 50 mm Accessories Air Vent GIP Ø 3" Accessories All Flanged Tee PVC Ø 4" x 4" Accessories All Flanged Tee PVC Ø 3" x 3" Accessories All Flanged Tee PVC Ø 3" x 2" Accessories All Flanged Tee CI Ø 12" X 12" Accessories All Flanged Tee CI Ø 12" X 8" Accessories All Flanged Tee CI Ø 12" X 2" Accessories All Flanged Tee CI Ø 12" x 12" Accessories All Flanged Tee CI Ø 10" x 10" Accessories All Flanged Tee CI Ø 8" x 8" Accessories All Flanged Tee CI Ø 6" x 6" Accessories All Flanged Tee CI Ø 6" x 4" Accessories All Flanged Tee CI Ø 4" x 4"

SATUAN m¹ m¹ m¹ m¹ Bh Bh Bh Bh Bh Bh Bh unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit unit Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

Halaman 97 dari 266 halaman

NO. 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462

Satuan Jadi 2016

JENIS BAHAN Accessories All Flanged Tee CI Ø 4" x 3" Accessories All Flanged Tee CI Ø 4" x 2" Accessories All Flanged Tee CI Ø 3" x 2" Accessories All Flanged Tee CI Ø 2" x 2" Accessories All Flanged Tee Y Cl Ø 12" X 12" Accessories Socket Tee PVC (All RR) Ø 6" x 6" Accessories Socket Tee PVC (All RR) Ø 6" x 4" Accessories Socket Tee PVC (All RR) Ø 4" x 4" Accessories Socket Tee PVC (All RR) Ø 4" x 3" Accessories Socket Tee PVC (All RR) Ø 4" x 2" Accessories Socket Tee PVC (All RR) Ø 3" X 3" Accessories Socket Tee PVC (All RR) Ø 3" X 2" Accessories Socket Tee PVC (All RR) Ø 2" X 2" Accessories Baut Moor 5/8" x 3" Accessories Baut Moor 5/8" x 4" Accessories Blind Flanged Ø 12" Accessories Blind Flanged Ø 8" Accessories Clem Besi Plat Ø 4" X 2 mm Accessories Dop PVC Ø 2" Accessories Dop PVC Ø 3" Accessories Dop PVC Ø 4" Accessories Dop PVC Ø 6" Accessories Double Flanged Bend CI Ø 12" X 11,25º Accessories Double Flanged Bend CI Ø 12" X 22,5º Accessories Double Flanged Bend CI Ø 12" X 45º Accessories Double Flanged Bend CI Ø 12" X 90º Accessories Double Flanged Bend CI Ø 8" x 22,5º Accessories Double Flanged Bend CI Ø 8" x 45º Accessories Double Flanged Bend CI Ø 8" x 90º Accessories Double Flanged Bend CI Ø 6" x 22,5º Accessories Double Flanged Bend CI Ø 6" x 45º Accessories Double Flanged Bend CI Ø 6" x 90º Accessories Double Flanged Bend CI Ø 4" x 11,5º Accessories Double Flanged Bend CI Ø 4" x 22,5º Accessories Double Flanged Bend CI Ø 4" x 45º Accessories Double Flanged Bend CI Ø 4" x 90º Accessories Double Flanged Bend CI Ø 3" x 22,5º Accessories Double Flanged Bend CI Ø 3" x 45º Accessories Double Flanged Bend CI Ø 3" x 90º Accessories Double Flanged Bend CI Ø 2" x 22,5º Accessories Double Flanged Bend CI Ø 2" x 45º Accessories Double Flanged Bend CI Ø 2" x 90º Accessories Double Flanged Pipe GIP Ø 3" x 60 cm.

SATUAN Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

Halaman 98 dari 266 halaman

NO. 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505

Satuan Jadi 2016

JENIS BAHAN Accessories Double Flanged Pipe GIP Ø 3" x 80 cm. Accessories Double Flanged Pipe GIP Ø 3" x 100 cm. Accessories Double Flanged Pipe GIP Ø 3" x 120 cm. Accessories Double Flanged Pipe GIP Ø 3" x 200 cm. Accessories Double Flanged Pipe GIP Ø 4" x 60 cm. Accessories Double Flanged Pipe GIP Ø 4" x 80 cm. Accessories Double Flanged Pipe GIP Ø 4" x 100 cm. Accessories Double Flanged Pipe GIP Ø 4" x 120 cm. Accessories Double Flanged Pipe GIP Ø 4" x 180 cm. Accessories Flanged Pipe GIP Ø 3" x 60 cm. Accessories Flanged Pipe GIP Ø 3" x 100 cm. Accessories Flanged Pipe GIP Ø 3" x 200 cm. Accessories Flanged Pipe GIP Ø 4" x 60 cm. Accessories Flanged Pipe GIP Ø 4" x 100 cm. Accessories Flanged Pipe GIP Ø 4" x 200 cm. Accessories Flanged Pipe GIP Ø 6" x 60 cm. Accessories Flanged Pipe GIP Ø 6" x 80 cm. Accessories Flanged Pipe GIP Ø 6" x 100 cm. Accessories Flanged Pipe GIP Ø 6" x 200 cm. Accessories Double Socket Bend CI for PVC Ø 6" x 11,25º Accessories Double Socket Bend CI for PVC Ø 6" x 22,5º Accessories Double Socket Bend CI for PVC Ø 6" x 45º Accessories Double Socket Bend CI for PVC Ø 6" x 90º Accessories Flanged Air Relief Valve Ø 2" Accessories Bend Doble Socet PVC Ø 10" X 11,25º Accessories Bend Doble Socet PVC Ø 10" X 22,5º Accessories Bend Doble Socet PVC Ø 10" X 45º Accessories Bend Doble Socet PVC Ø 10" X 90º Accessories Bend Doble Socet PVC Ø 8" x 22,5º Accessories Bend Doble Socet PVC Ø 8" x 45º Accessories Bend Doble Socet PVC Ø 8" x 90º Accessories Bend Doble Socet PVC Ø 6" x 22,5º Accessories Bend Doble Socet PVC Ø 6" x 45º Accessories Bend Doble Socet PVC Ø 6" x 90º Accessories Bend Doble Socet PVC Ø 4" x 11,5º Accessories Bend Doble Socet PVC Ø 4" x 22,5º Accessories Bend Doble Socet PVC Ø 4" x 45º Accessories Bend Doble Socet PVC Ø 4" x 90º Accessories Bend Doble Socet PVC Ø 3" x 22,5º Accessories Bend Doble Socet PVC Ø 3" x 45º Accessories Bend Doble Socet PVC Ø 3" x 90º Accessories Bend Doble Socet PVC Ø 2" x 22,5º Accessories Bend Doble Socet PVC Ø 2" x 45º

SATUAN Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

Halaman 99 dari 266 halaman

NO. 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548

Satuan Jadi 2016

JENIS BAHAN Accessories Bend Doble Socet PVC Ø 2" x 90º Accessories Flanged Socket PVC RRJ Ø 2" Accessories Flanged Socket PVC RRJ Ø 3" Accessories Flanged Socket PVC RRJ Ø 4" Accessories Flanged Socket PVC RRJ Ø 6" Accessories Flanged Socket PVC RRJ Ø 8" Accessories Flanged Socket PVC RRJ Ø 10" Accessories Flanged Socket PVC RRJ Ø 12" Accessories Flanged Spigot PVC Ø 2" Accessories Flanged Spigot PVC Ø 3" Accessories Flanged Spigot PVC Ø 4" Accessories Flanged Spigot PVC Ø 6" Accessories Flanged Spigot PVC Ø 8" Accessories Flanged Spigot PVC Ø 12" Accessories Flanged Steel PN 10 Ø 2" Accessories Flanged Steel PN 10 Ø 3" Accessories Flanged Steel PN 10 Ø 4" Accessories Flanged Steel PN 10 Ø 6" Accessories Flanged Steel PN 10 Ø 8" Accessories Flanged Steel PN 10 Ø 10" Accessories Flanged Steel PN 10 Ø 12" Accessories Flanged Strainer CI Ø 3" Accessories Flanged Strainer CI Ø 4" Accessories Flanged Strainer CI Ø 6" Accessories Flanged Strainer CI Ø 8" Accessories Fleksible Joint "Tosen" Ø 4 Accessories Fleksible Joint "Tosen" Ø 6 Accessories Fleksible Joint "Tosen" Ø 8 Accessories Fleksible Joint "Tosen" Ø 10 Accessories Fleksible Joint "Tosen" Ø 12 Accessories Manhole 80 x 80 Cm. Accessories Paking Karet Ø 2" Accessories Paking Karet Ø 3" Accessories Paking Karet Ø 4" Accessories Paking Karet Ø 6" Accessories Paking Karet Ø 8" Accessories Paking Karet Ø 10" Accessories Paking Karet Ø 12" Accessories DF Pipa GIP Ø 3" x 60 cm. Accessories DF Pipa GIP Ø 3" x 100 cm. Accessories Pressure Reducing Valve Ø 6" Accessories Repair Socket PVC Ø 2" Accessories Socket Repair PVC Ø 6"

SATUAN Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh unit Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

Halaman 100 dari 266 halaman

NO. 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591

Satuan Jadi 2016

JENIS BAHAN Accessories Rubber Expansiont Joint Ø 6" Accessories Rubber Water Stop 30 Cm Accessories Socket GIP Ø 2" Accessories Socket GIP Ø 3" Accessories Socket GIP Ø 4" Accessories Socket GIP Ø 6" Accessories Socket Reducer PVC (All RR) Ø 3" x 2" Accessories Socket Reducer PVC (All RR) Ø 4" x 3" Accessories Socket Reducer PVC (All RR) Ø 4" x 2" Accessories Socket Reducer PVC (All RR) Ø 6" x 3" Accessories Socket Reducer PVC (All RR) Ø 6" x 4" Accessories Socket Reducer PVC (All RR) Ø 8" x 6" Accessories Socket Reducer PVC (All RR) Ø 10" x 8" Accessories Socket Spigot Bend PVC Ø 12" X 90º Accessories Socket Spigot Bend PVC Ø 12" X 45º Accessories Socket Spigot Bend PVC Ø 12" X 22,5º Accessories Socket Spigot Bend PVC Ø 12" X 11,25º Accessories Socket Spigot Bend PVC Ø 8" x 22,5º Accessories Socket Spigot Bend PVC Ø 8" x 45º Accessories Socket Spigot Bend PVC Ø 8" x 90º Accessories Socket Spigot Bend PVC Ø 6" x 22,5º Accessories Socket Spigot Bend PVC Ø 6" x 45º Accessories Socket Spigot Bend PVC Ø 6" x 90º Accessories Socket Spigot Bend PVC (S-10) Ø 4" x 22,5º Accessories Socket Spigot Bend PVC (S-10) Ø 4" x 45º Accessories Socket Spigot Bend PVC (S-10) Ø 4" x 90º Accessories Socket Spigot Bend PVC ( S-10) Ø 3" x 90º Accessories Socket Spigot Bend PVC ( S-10) Ø 3" x 45º Accessories Socket Spigot Bend PVC ( S-10) Ø 3" x 22,5º Accessories Socket Spigot Bend PVC ( S-10) Ø 2" x 90º Accessories Socket Spigot Bend PVC ( S-10) Ø 2" x 45º Accessories Socket Spigot Bend PVC ( S-10) Ø 2" x 22,5º Accessories Tangki Fiberglass 2 m³ Accessories Tutup Manhole 0,80 x 0,80 Accessories Tutup Manhole 1 x 0,80 Accessories Socket Reducer HDPE Ø 10" x 8" Accessories Socket Reducer HDPE Ø 8" x 6" Accessories Socket Reducer HDPE Ø 6" x 4" Accessories Socket Reducer HDPE Ø 4" x 3" Accessories Socket Reducer HDPE Ø 3" x 2" Accessories Elbow With Thread HDPE Ø 10" x 90º Accessories Elbow With Thread HDPE Ø 8" x 90º Accessories Elbow With Thread HDPE Ø 6" x 90º

SATUAN Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh unit unit unit Bh Bh Bh Bh Bh Bh Bh Bh

Halaman 101 dari 266 halaman

NO.

JENIS BAHAN

SATUAN

592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634

Accessories Elbow With Thread HDPE Ø 4" x 90º Accessories Elbow With Thread HDPE Ø 3" x 90º Accessories Elbow With Thread HDPE Ø 2" x 90º Accessories Elbow Pushon Sistem Male HDPE Ø 1" x 90º Accessories Elbow Pushon Sistem Male HDPE Ø 3/4" x 90º Accessories Elbow Pushon Sistem Male HDPE Ø 1/2" x 90º x 25 Accessories Elbow Pushon Sistem Male HDPE Ø 1" x 90º x 20 Accessories Elbow Pushon Sistem Female HDPE Ø 3/4" x 90º x 2 Accessories Elbow Pushon Sistem Female HDPE Ø 1/2" x 90º x 2 Accessories Fitting Compression Push Fit Accessories Tee HDPE 90º Ø 10" Accessories Tee HDPE 90º Ø 8" Accessories Tee HDPE 90º Ø 6" Accessories Tee HDPE 90º Ø 4" Accessories Tee HDPE 90º Ø 3" Accessories Tee HDPE 90º Ø 2" Accessories Bend HDPE 90º Ø 12" Accessories Bend HDPE 90º Ø 8" Accessories Bend HDPE 90º Ø 6" Accessories Bend HDPE 90º Ø 4" Accessories Bend HDPE 90º Ø 3" Accessories Bend HDPE 90º Ø 2" Accessories Bend HDPE 45º Ø 10" Accessories Bend HDPE 45º Ø 8" Accessories Bend HDPE 45º Ø 6" Accessories Bend HDPE 45º Ø 4" Accessories Bend HDPE 45º Ø 3" Accessories Bend HDPE 45º Ø 2" Accessories Stub End HDPE Ø 10" Accessories Stub End HDPE Ø 8" Accessories Stub End HDPE Ø 6" Accessories Stub End HDPE Ø 4" Accessories Stub End HDPE Ø 3" Accessories Stub End HDPE Ø 2" Accessories Flange HDPE Ø 12" Accessories Flange HDPE Ø 8" Accessories Flange HDPE Ø 6" Accessories Flange HDPE Ø 4" Accessories Flange HDPE Ø 3" Accessories Flange HDPE Ø 2" Accessories Cap/Dop HDPE Ø 8" Accessories Cap/Dop HDPE Ø 6" Accessories Cap/Dop HDPE Ø 4"

Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

Satuan Jadi 2016

Halaman 102 dari 266 halaman

NO. 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677

Satuan Jadi 2016

JENIS BAHAN Accessories Cap/Dop HDPE Ø 3" Accessories Cap/Dop HDPE Ø 2" Accessories Cap/Dop HDPE Ø 1" Accessories Cap/Dop HDPE Ø 3/4" Accessories Cap/Dop HDPE Ø 1/2" Accessories Clamp Saddle 6" (160 mm) Accessories Clamp Saddle 4" (110 mm) Accessories Clamp Saddle 3" (90 mm) Accessories Clamp Saddle 2" (63 mm) Accessories Clamp Saddle 1½" (50 mm) Accessories Male thread adaptor (MTA) 1" (32 mm) Accessories Male thread adaptor (MTA) 3/4" (25 mm) Accessories Male thread adaptor (MTA) 1/2" (20 mm) Accessories Tap Kran Accessories Box Merer Cover Pompa Air Listrik; Suction 9 m; Head 40 m; kap. 35 l/min Pompa Centrifugal; Head 100 m; kap. 11 l/dt Pompa Tangan Dragon Profil Tank Fiberglass orange kap. 1100 ltr. Profil Tank Fiberglass orange kap. 650 ltr. Shower Screen Fiber Shower Screen Kaca Stop Kran 1" Stop Kran 1/2" Stop Kran 2" Stop Kran 3/4" Submersible Deep Well Pump; Head 100 m; kap.1 HP Submersible Deep Well Pump; Head 70 m; kap.2 HP Urinoir Keramik Standar Wastafel Gantung Keramik Box MCB Down Light Warna 3" Setara Phillips Down Light Warna 4" Setara Phillips Down Light Warna 5" Setara Phillips Down Light Warna 6" Setara Phillips Exhaust Fetting Genset 1300 W Genset 2000 W Genset 2500 W Genset 5000 W Genset 6000 W Genset 900 W

SATUAN Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Unit Unit Unit Bh Bh Bh Bh Bh Bh Bh Bh Unit Unit Bh Bh Unit Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

Halaman 103 dari 266 halaman

NO. 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720

Satuan Jadi 2016

JENIS BAHAN Kabel Ravo 2x1,5 mm2 Kabel Ravo 2x2,5 mm2 Lampu Downlight 4' Lampu Neon SL 15 Wat Setara Phillips Lampu Neon SL 18 Wat Setara Phillips Lampu Pijar 100 Wat Setara Phillips Lampu Pijar 25 Wat Setara Phillips Lampu Pijar 40 Wat Setara Phillips Lampu Pijar 60 Wat Setara Phillips Lampu TL (Neon) 10 Wat (komplet) Setara Phillips Lampu TL (Neon) 20 Wat (komplet) Setara Phillips Lampu TL (Neon) 40 Wat (komplet) Setara Phillips Main Distribusi Panel (PDM) Saklar Ganda Saklar Stopkontak Saklar Tunggal Sekring Automatik Stop Kontak Alumunium foil Carpet Carpet 80% wool, 20% nylon Feltex carpet 100% wool T-21 Floor hardener Gymfloor Lem vinyil Lt vinyl karet 30x30 kwl II Lt vinyl karet 30x30 kwl l Parquet jati Underlyer tebal 6 mm/rubber corrugated Vinyil Vinyil asbes Vinyil motif kembang Ex DN Vinyil wall covering lebar 50 cm Wallpaper Jendela besi Jendela besi tahan api Kaca Buram 12 mm Kaca Buram 5 mm Kaca cermin tebal 5 mm Kaca cermin tebal 8 mm Kaca patri Kaca Polos 3 mm Kaca Polos 5 mm

SATUAN M¹ M¹ Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Unit Bh Bh Bh Bh Bh M² M² M² M² Kg M² Kg M² M² M² M² Lbr Bh Bh M² M² M² M² M² M² M² M² M² M² M²

Halaman 104 dari 266 halaman

NO. 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763

Satuan Jadi 2016

JENIS BAHAN Kaca Polos 8 mm Kaca Ray-Band 5 mm Kaca wireglass Kawat burung Kawat Harmonika Kawat Nyamuk/Kasa Logam Kawat Nyamuk/Kasa Plastik Naco (Kerangka dan Daun) Pintu besi baja Pintu lipat Plastik Filter Sunscreen alumunium Door closer Door holder Door Stop Engsel (setara solid) 3" Engsel (setara solid) 4" Engsel Biasa 2 1/2" Engsel Biasa 3" Engsel Lokal Besar Engsel Nylon Arch 3" Espagnolet Formica Grendel (setara solid) Grendel Lokal Besar Hak Angin Biasa Kait angin Kosen + Pintu PVC Kunci lemari Kunci Pintu Master (setara solid) Kunci Selot Kunci Silinder Putar Kunci Tanam 2 Slag Kunci Tanam 3 Slag Kunci Tanam Biasa Pegangan pintu biasa Pintu alumunium Rol pintu dorong Sealent Tarikan Pintu (setara solid) 10" Tarikan Pintu (setara solid) 15" Tarikan Pintu (setara solid) 20" Venetion blinds

SATUAN M² M² M² M² M² M² M² M² M² M² M² M² Bh Bh Bh Bh Bh Bh Bh Bh Bh Set Lbr Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh M² Bh Kg Psg Psg Psg M²

Halaman 105 dari 266 halaman

NO.

JENIS BAHAN

764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806

Bambu / Dolken Gypsum 12 mm Gypsum 9 mm Kayu Profil 3/3 Kayu Profil 3/8 List Profil List Profil Gypsum Lumbressering Metal Furing (Rangka Plafond) Multipleks 4 mm Multipleks 6 mm Multipleks 9 mm Plywood 3 mm Plywood 4 mm Plywood 6 mm Softboard Teakwood 3x7 Teakwood 4x8 Tripleks 3 mm Tripleks 4 mm Tripleks 6 mm Lem Kayu Glass Bit Sabun Polimer Cat Anti Karat Genteng Onduline Stop Kran 1" PVC Stop Kran 1/2" Besi Stop Kran 2" PVC Stop Kran 3/4" Besi Lampu Taman Kecil Lampu Taman Sedang Lampu Taman Besar Poliurythane Agregat Pecah Mesin 0-5 mm Agregat Pecah Mesin 20-30 mm Agregat Pecah Mesin 50-70 mm Agregat Pecah Mesin 5-10 & 10-20 mm Anchorage Anti strpping agent Arbocell Asbuton Halus

Satuan Jadi 2016

SATUAN Btg Lbr Lbr Ujg Ujg M' M' Ujg Ujg Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Kg Kg Kg Kg Kg Lbr Bh Bh Bh Bh Bh Bh Bh M2 M3 M3 M3 M3 buah liter Kg. Ton

Halaman 106 dari 266 halaman

NO. 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849

Satuan Jadi 2016

JENIS BAHAN Asbuton yang diproses Aspal Emulsi Assetilline Bahan Modifikasi Bahan pengawet: kreosot Bahan Pengisi (Filler) Tambahan Baja Bergelombang Baja Prategang Batu Bara Batu Belah / Kerakal Bunker Oil Casing Cerucuk Curing Compound Ducting (Kabel prestress) Ducting (Strand prestress) Elastomer Alam Elastomer jenis 1 Elastomer jenis 2 Elastomer jenis 3 Elastomer Sintesis Expansion Cap Expansion Join Baja Siku Expansion Join Tipe Rubber Expansion Joint Tipe Torma Expansion Tipe Joint Asphaltic Plug Gravel Joint Sealent Joint Socket Pile 16x16x16 Joint Socket Pile 35x35 Kapur Kerb jenis 1 Kerb jenis 2 Kerb jenis 3 Kerb Type A Mikro Pile 16x16x16 Mini Timber Pile Minyak Fluks Oxygen Additive Bahan Agr.Base Kelas C2 Pasir Halus (untuk HRS) Pasir Tailing

SATUAN Kg Kg Botol Kg liter Kg Kg Kg Kg M3 Liter M2 M Ltr M' M' Kg buah buah buah Kg M2 M M M1 M M3 Kg Set Set M3 Buah Buah Buah Buah M1 Buah Liter Botol Ltr M3 M3 M3

Halaman 107 dari 266 halaman

NO. 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888

Satuan Jadi 2016

JENIS BAHAN Pasir Urug (ada unsur lempung) Strip Bearing Tiang Pancang Baja Matras Concrete Cat Marka (Non Thermoplas) Polytene 125 mikron Kayu Acuan Aditif anti pengelupasan Mata Kucing PCI Girder L=17m PCI Girder L=21m PCI Girder L=26m PCI Girder L=32m PCI Girder L=36m PCI Girder L=41m Pelat Rambu (Eng. Grade) Pelat Rambu (High I. Grade) Pemantul Cahaya (Reflector) Pipa Baja Multipleks 12 mm Cansteen 15x28x40 Filler Cat Marka (Thermoplastic) Bahan Agr.Base Kelas A Bahan Agr.Base Kelas B Bahan Agr.Base Kelas C Baja Tulangan (Polos) U24 Baja Tulangan (Ulir) U32 Tiang Pancang Beton Pratekan Baja Tulangan (Polos) U32 Baja Tulangan (Ulir) U39 Baja Tulangan (Ulir) U48 Pipa Galvanis Dia 1,5" Profil Alumunium Swing Door 6 M Tiang Polos Profil Alumunium Swing Door 4,4 M Tiang Polos Profil Alumunium Swing Door 6 M Tiang Moher Profil Alumunium Swing Door 4,4 M Tiang Moher Profil Alumunium Swing Door Ambang Atas Profil Alumunium Swing Door Ambang Bawah

SATUAN M3 Buah M' Buah Kg Kg M3 Kg buah Buah Buah Buah Buah Buah Buah BH BH Bh. Kg Lbr Buah Kg Kg M³ M³ M³ Kg Kg M³ Kg Kg Kg M¹ Bh Bh Bh Bh Bh Bh

Halaman 108 dari 266 halaman

NO. 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928

Satuan Jadi 2016

JENIS BAHAN Profil Alumunium Swing Door Tutup Ambang Profil Alumunium Swing Door Skoneng (Besar) Profil Alumunium Swing Door 6 M Tiang Sliding Profil Alumunium Swing Door 4,4 M Tiang Sliding Profil Alumunium Swing Door 6 M Tiang Sliding Kait Profil Alumunium Swing Door 4,4 M Tiang Sliding Kait Profil Alumunium Shop Front 1½ X 3 " (M) Profil Alumunium Shop Front 1½ X 3 " (Open Back) Profil Alumunium Shop Front 1½ X 3 " (Jip/Tangga) Profil Alumunium Shop Front 1½ X 3 " (Tutup Jip/Tangga) Profil Alumunium Shop Front 1½ X 3 " (Tutup Kaca Mati) Profil Alumunium Shop Front 1½ X 3 " (Tutup Kaca Polos) Profil Alumunium Shop Front 1⅞ X 4 " (M) Profil Alumunium Shop Front 1⅞ X 4 " (Open Back) Profil Alumunium Shop Front 1⅞ X 4 " (Jip/Tangga) Profil Alumunium Shop Front 1⅞ X 4 " (Tutup Kaca Mati) Profil Alumunium Casement (Frame) Profil Alumunium Casement (Skoneng) A.A Sliding A.B Sliding R.A Sliding R.S Sliding 4,4 M R.S Sliding 6 M R.B Sliding Tiang Sliding Ekon Tiang Sliding Kait Ekon A.A Sliding Ekonomi A.B Sliding Ekonomi R.A Sliding Door R.S Slid Ekonomi R.B Sliding Door Troling Full U. Roling Center Post 10 Center Post 11,4 M Skrup 3 M Skrup 4 Hollow 1/2 X 3/4 Down Roling Full Down Roling Kunci

SATUAN Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh

Halaman 109 dari 266 halaman

NO. 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943

JENIS BAHAN Cuartain Wall (5303) Cuartain Wall (5304) Cuartain Wall (5305) Baja Struktur Perlengkapan Semen tahan Asam

SATUAN Bh Bh Bh Kg Ls Kg

Catatan : - Sesuai harga yang berlaku dipasaran. - Harga satuan belum termasuk pajak yang berlaku. - Harga sewaktu-waktu bisa berubah Menyetujui, Plt. KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

CV. DAYA ABADI

Ir. FERRY T. SIWI, M.Si NIP. 19590626 199103 1 008

Satuan Jadi 2016

Halaman 110 dari 266 halaman

TUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

DAFTAR HARGA SATUAN BAHAN HARGA (Rp.)

KET

485,145.42 420,407.22 317,357.23 337,983.91 337,983.91 150.00 30,000.00 12,000.00 1,600,000.00 850.00 2,400.00 135,000.00 7,090.00 1,780.00 260,800.00 240,000.00 350,000.00 147,655.00 147,500.00 210,000.00 218,530.00 218,530.00 167,475.00 190,575.00 196,350.00 350,000.00 375,000.00 337,500.00 312,500.00 287,500.00 153,565.00 135,845.00

Satuan Jadi 2016

Halaman 111 dari 266 halaman

HARGA (Rp.) 7,300.00 8,599.00 28,645.00 51,975.00 30,000.00 7,685.00 4,048.00 40,000.00 245,460.00 1,070.00 825,830.00 326,015.00 326,015.00 11,815.00 8,865.00 12,410.00 35,000.00 53,155.00 8,383.00 205,000.00 260,700.00 213,000.00 3,500.00 4,000.00 6,600.00 7,775.00 1,269.98 2,960.00 13,860.00 151,435.00 59,065.00 64,330.00 59,065.00 80,405.00 3,600.00 20,000.00 78,615.38 108,000.00 75,000.00 95,000.00 85,000.00 135,000.00 200,000.00

Satuan Jadi 2016

KET

Halaman 112 dari 266 halaman

HARGA (Rp.) 90,000.00 105,000.00 150,000.00 190,000.00 225,000.00 325,000.00 475,000.00 1,000,000.00 92,400.00 1,000,000.00 375,000.00 650,000.00 330,750.00 236,250.00 413,440.00 271,690.00 236,250.00 177,190.00 295,315.00 189,000.00 34,650.00 21,125.00 436,975.00 600,600.00 496,125.00 744,190.00 24,000.00 23,625.00 50,000.00 29,530.00 275,000.00 500,000.00 250,000.00 1,000.00 25,000.00 35,000.00 24,500.00 35,000.00 60,000.00 60,000.00 35,000.00 25,000.00 885,940.00

Satuan Jadi 2016

KET

Halaman 113 dari 266 halaman

HARGA (Rp.) 238,735.00 23,625.00 153,565.00 2,021,250.00 235.00 710.00 11,700.00 30,000.00 64,500.00 96,000.00 142,000.00 195,000.00 12,815.00 136,000.00 152,125.00 225,000.00 379,780.00 297,500.00 353,000.00 14,770.00 17,720.00 46,200.00 38,395.00 37,500.00 45,000.00 65,000.00 75,000.00 5,000.00 135,000.00 65,000.00 129,590.00 60,000.00 175,000.00 250,000.00 108,000.00 34,500.00 140,000.00 1,420.00 11,815.00 70,000.00 65,000.00 20,000.00 50,000.00

Satuan Jadi 2016

KET

Halaman 114 dari 266 halaman

HARGA (Rp.) 22,500.00 7,500.00 50,000.00 51,000.00 60,550.00 75,000.00 13,650.00 15,000.00 60,000.00 1,181,250.00 606,375.00 167,475.00 144,375.00 225,225.00 171,280.00 236,250.00 10,000,000.00 11,000,000.00 7,000,000.00 4,500,000.00 2,500,000.00 2,200,000.00 38,300.00 31,310.00 47,000.00 98,000.00 35,000.00 157,000.00 250,000.00 35,650.00 33,000.00 37,500.00 87,500.00 32,500.00 41,345.00 82,690.00 34,650.00 53,155.00 35,440.00 5,905.00 41,345.00 27,170.00 20,680.00

Satuan Jadi 2016

KET

Halaman 115 dari 266 halaman

HARGA (Rp.) 11,815.00 32,490.00 27,500.00 57,750.00 32,500.00 35,000.00 30,000.00 178,265.00 90,000.00 55,000.00 66,500.00 50,000.00 59,500.00 80,000.00 42,000.00 37,000.00 62,500.00 65,000.00 45,000.00 65,500.00 67,573.00 5,905.00 1,550,000.00 3,545.00 3,835.00 2,887,500.00 2,500.00 7,272.73 15,000.00 2,400.00 7,727.27 15,166.67 82,690.00 35,440.00 78,000.00 70,875.00 115,500.00 185,000.00 59,065.00 83,743.00 225,000.00 115,500.00 195,000.00

Satuan Jadi 2016

KET

Halaman 116 dari 266 halaman

HARGA (Rp.) 435,000.00 273,000.00 70,000.00 1,500.00 2,275.00 1,305.00 2,125.00 2,365.00 3,000.00 3,750.00 4,700.00 6,800.00 6,850.00 10,520.00 10,285.00 13,700.00 56,115.00 35,440.00 40,165.00 37,800.00 2,070.00 1,780.00 1,890.00 2,079.00 36,620.00 36,620.00 38,980.00 41,345.00 42,525.00 44,305.00 7,090.00 7,685.00 5,320.00 2,655.00 1,000.00 33,075.00 49,615.00 100,405.00 177,190.00 1,945.00 4,140.00 8,270.00 9,305.00

Satuan Jadi 2016

KET

Halaman 117 dari 266 halaman

HARGA (Rp.) 4,140.00 76,780.00 450,000.00 650,000.00 577,500.00 5,100,000.00 10,741,500.00 40,000.00 3,850,000.00 2,250,000.00 1,754,000.00 1,000,000.00 305,000.00 1,250,000.00 85,000.00 40,000.00 200,000.00 125,000.00 375,000.00 625,000.00 150,000.00 150,000.00 70,000.00 205,000.00 460,000.00 85,000.00 100,000.00 500,000.00 205,000.00 370,000.00 75,000.00 14,000.00 11,000.00 28,875.00 38,635.00 9,625.00 17,500.00 21,250.00 5,387.50 6,950.00 14,250.00 16,575.00 41,750.00

Satuan Jadi 2016

KET

Halaman 118 dari 266 halaman

HARGA (Rp.) 7,050.00 67,250.00 1,318,680.00 986,535.00 701,800.00 484,366.67 302,316.67 208,816.67 126,683.33 977,279.17 614,304.17 395,445.83 248,425.00 118,416.67 79,033.33 45,150.00 24,066.67 10,583.33 9,416.67 6,133.33 800,608.33 503,566.67 322,241.67 202,741.67 95,679.17 66,104.17 32,225.00 24,066.67 10,583.33 9,416.67 6,133.33 1,117,115.00 702,100.00 451,510.00 288,880.00 138,130.00 92,495.00 46,195.00 16,400.00 14,500.00 12,500.00 11,500.00 10,000.00

Satuan Jadi 2016

KET

Halaman 119 dari 266 halaman

HARGA (Rp.) 16,400.00 12,500.00 10,400.00 7,900.00 715,000.00 1,372,800.00 1,960,200.00 3,630,000.00 5,544,000.00 6,652,800.00 9,196,000.00 935,000.00 550,000.00 277,200.00 154,000.00 57,600.00 3,520,000.00 4,400,000.00 5,280,000.00 6,336,000.00 7,603,200.00 269,900.00 2,640,000.00 3,564,000.00 4,488,000.00 6,336,000.00 8,448,000.00 13,200,000.00 31,680,000.00 880,000.00 473,000.00 586,850.00 522,720.00 496,584.00 3,960,000.00 3,432,000.00 2,864,400.00 4,455,000.00 2,970,000.00 1,980,000.00 1,320,000.00 1,225,400.00 1,135,200.00

Satuan Jadi 2016

KET

Halaman 120 dari 266 halaman

HARGA (Rp.) 786,500.00 757,900.00 605,000.00 275,000.00 3,916,000.00 1,107,900.00 1,095,300.00 416,100.00 409,300.00 404,300.00 237,600.00 231,100.00 174,800.00 8,800.00 13,200.00 891,000.00 715,000.00 49,500.00 32,560.00 58,850.00 105,600.00 130,130.00 1,584,000.00 1,672,000.00 1,925,000.00 2,757,700.00 473,000.00 532,400.00 627,000.00 259,600.00 308,330.00 339,900.00 112,200.00 118,800.00 128,700.00 139,700.00 71,610.00 81,510.00 91,740.00 36,630.00 39,600.00 44,770.00 632,280.00

Satuan Jadi 2016

KET

Halaman 121 dari 266 halaman

HARGA (Rp.) 753,720.00 935,880.00 996,600.00 1,543,080.00 524,656.00 638,704.00 809,776.00 866,800.00 1,208,944.00 543,840.00 786,720.00 1,393,920.00 742,500.00 1,053,066.67 1,984,766.67 1,195,700.00 1,564,200.00 1,859,000.00 3,480,400.00 1,504,800.00 1,518,000.00 1,610,400.00 1,768,800.00 1,685,200.00 983,600.00 1,056,400.00 1,188,700.00 1,517,800.00 591,100.00 666,200.00 784,900.00 324,600.00 358,200.00 422,300.00 139,200.00 148,400.00 160,700.00 174,800.00 89,600.00 102,000.00 114,800.00 45,900.00 49,600.00

Satuan Jadi 2016

KET

Halaman 122 dari 266 halaman

HARGA (Rp.) 56,000.00 177,900.00 245,000.00 323,100.00 596,000.00 960,200.00 985,000.00 1,499,400.00 139,370.00 192,940.00 244,640.00 479,820.00 747,120.00 1,108,030.00 89,100.00 118,800.00 165,000.00 237,600.00 316,800.00 380,160.00 475,200.00 1,265,000.00 1,650,000.00 2,040,500.00 2,310,000.00 1,425,600.00 1,782,000.00 2,138,400.00 2,566,080.00 3,079,296.00 495,000.00 26,620.00 31,460.00 47,190.00 66,000.00 104,500.00 123,750.00 143,000.00 455,400.00 667,920.00 66,000,000.00 104,500.00 550,000.00

Satuan Jadi 2016

KET

Halaman 123 dari 266 halaman

HARGA (Rp.) 1,914,000.00 429,000.00 55,000.00 77,000.00 92,400.00 253,000.00 77,600.00 131,600.00 117,300.00 202,800.00 232,800.00 523,200.00 799,100.00 3,880,800.00 3,484,800.00 2,822,160.00 2,376,000.00 982,423.20 1,150,274.40 1,323,062.40 525,360.00 615,120.00 707,520.00 241,560.00 260,040.00 289,080.00 231,000.00 204,600.00 180,840.00 136,950.00 125,796.00 112,200.00 4,400,000.00 495,000.00 935,000.00 990,200.00 527,000.00 361,300.00 135,800.00 102,600.00 1,482,900.00 931,400.00 764,000.00

Satuan Jadi 2016

KET

Halaman 124 dari 266 halaman

HARGA (Rp.) 375,900.00 305,900.00 183,000.00 49,400.00 36,800.00 29,400.00 27,200.00 23,600.00 20,000.00 20,000.00 1,199,300.00 833,400.00 653,600.00 424,800.00 362,900.00 263,400.00 1,710,720.00 829,950.00 680,680.00 334,950.00 272,580.00 163,020.00 1,146,420.00 645,260.00 521,400.00 272,250.00 189,310.00 112,090.00 1,088,600.00 744,800.00 475,300.00 269,600.00 218,100.00 149,300.00 2,444,475.00 901,395.00 565,290.00 366,685.00 239,910.00 146,685.00 374,385.00 191,510.00 79,475.00

Satuan Jadi 2016

KET

Halaman 125 dari 266 halaman

HARGA (Rp.) 27,170.00 18,095.00 17,160.00 13,860.00 9,570.00 172,100.00 103,600.00 93,200.00 57,600.00 45,300.00 44,990.00 34,650.00 28,050.00 18,000.00 40,000.00 190,000.00 12,705,000.00 324,845.00 1,350,000.00 900,000.00 2,887,500.00 4,042,500.00 90,000.00 141,000.00 135,000.00 65,000.00 6,063,750.00 4,620,000.00 1,583,505.00 638,110.00 50,000.00 78,000.00 90,000.00 80,000.00 174,000.00 404,250.00 8,865.00 3,457,000.00 4,164,000.00 5,150,000.00 6,507,000.00 7,420,000.00 2,400,000.00

Satuan Jadi 2016

KET

Halaman 126 dari 266 halaman

HARGA (Rp.) 7,500.00 12,500.00 69,300.00 43,300.00 35,350.00 15,000.00 11,500.00 14,600.00 5,200.00 33,500.00 50,000.00 57,500.00 3,250.00 32,100.00 22,500.00 20,000.00 28,875.00 17,325.00 145,000.00 76,780.00 94,500.00 194,905.00 32,490.00 340,000.00 32,490.00 100,405.00 94,500.00 350,000.00 200,815.00 55,000.00 14,770.00 20,680.00 118,125.00 265,000.00 885,940.00 1,063,125.00 354,375.00 206,720.00 189,000.00 236,250.00 354,375.00 125,000.00 179,025.00

Satuan Jadi 2016

KET

Halaman 127 dari 266 halaman

HARGA (Rp.) 189,000.00 184,800.00 177,190.00 20,680.00 36,910.00 30,000.00 25,000.00 472,500.00 413,440.00 885,940.00 11,815.00 147,655.00 412,000.00 212,500.00 112,500.00 65,000.00 90,000.00 49,000.00 55,000.00 89,900.00 34,000.00 160,000.00 82,690.00 35,000.00 66,000.00 30,000.00 20,218.00 404,250.00 15,000.00 275,000.00 35,000.00 115,000.00 75,000.00 236,250.00 124,000.00 137,000.00 856,550.00 94,500.00 97,020.00 150,000.00 288,750.00 462,000.00 70,875.00

Satuan Jadi 2016

KET

Halaman 128 dari 266 halaman

HARGA (Rp.) 14,770.00 118,125.00 76,000.00 15,000.00 17,500.00 15,000.00 125,000.00 25,000.00 35,440.00 80,000.00 90,000.00 145,000.00 110,000.00 65,000.00 78,000.00 70,875.00 85,000.00 110,000.00 65,000.00 80,000.00 120,000.00 45,000.00 41,580.00 17,720.00 51,975.00 43,360.00 150,000.00 90,000.00 141,000.00 135,000.00 65,000.00 220,400.00 526,000.00 1,236,000.00 191,000.00 420,978.60 228,054.09 459,380.00 308,439.30 1,538,460.00 57,750.00 36,960.00 6,861,860.00

Satuan Jadi 2016

KET

Halaman 129 dari 266 halaman

HARGA (Rp.) 8,100.00 12,000.00 265,080.00 1,160.00 5,905.00 5,780.00 24,504.75 13,860.00 690.00 262,400.00 2,630.00 9,000.00 17,330.00 38,500.00 173,250.00 57,750.00 53,200.00 489,780.00 825,830.00 1,064,680.00 53,200.00 6,050.00 317,630.00 1,386,000.00 1,200,000.00 1,188,260.00 290,600.00 39,390.00 67,500.00 607,500.00 245,460.00 45,000.00 50,000.00 55,000.00 51,980.00 60,750.00 27,000.00 2,394.00 132,540.00 38,500.00 97,335.00 234,300.00 259,000.00

Satuan Jadi 2016

KET

Halaman 130 dari 266 halaman

HARGA (Rp.) 205,000.00 229,500.00 25,247.37 467,780.00 95,060.00 19,250.00 2,200,000.00 30,000.00 86,630.00 148,995,000.00 168,052,500.00 214,830,000.00 272,002,500.00 291,060,000.00 332,640,000.00 193,600.00 238,150.00 27,000.00 19,060.00 209,640.00

KET

1,500.00 126,710.00 485,646.60 420,682.37 319,316.63 11,440.00 12,815.00 423,957.93 12,815.00 13,315.00 13,815.00 75,000.00

Satuan Jadi 2016

Halaman 131 dari 266 halaman

HARGA (Rp.)

KET

86,000.00

Satuan Jadi 2016

Halaman 132 dari 266 halaman

HARGA (Rp.)

KET

20,000.00 200.00 2,000.00

Dibuat Oleh, CV. DAYA ABADI GEMILANG

ANNEKE I UNTU, ST Direktur

Satuan Jadi 2016

Halaman 133 dari 266 halaman

LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANADO Nomor

:

Tanggal

:

Tentang

: Penetapan Standardisasi Harga Satuan Jadi di lingkungan Pemerintah Kota Manado T.A. 2016

DAFTAR HARGA SATUAN ALAT NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Satuan Jadi 2016

JENIS ALAT Aggregat (Chip) Spreader Aspahlt Tanker Asphalt Distributor Asphalt Finisher Asphalt Liquid Mixer Asphalt Mixing Plant (AMP) Asphalt Sprayer Blending Equipment Bore Pile Machine Bulldozer 100-150 HP Cement Tanker Chainsaw Cold Milling Cold Recycler Compressor 4000-6500 L\M Concrete Breaker Concrete Mixer 0.3-0.6 M³ Concrete Pan Mixer Concrete Pump Concrete Vibrator Condrete Mixer (350) Crane 10-15 Ton Crane On Track 35 Ton Crane On Track 75-100 Ton Dump Truck 10 Ton Dump Truck 3.5 Ton Excavator 80-140 Hp Flat Bed Truck 3-4 M³ Fulvi Mixer Generator Set Hot Recycler

SATUAN Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja

Halaman134 dari 266

32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54

Jack Hammer Motor Grader >100 HP Pedestrian Roller Pile Driver + Hammer Rock Drill Breaker Slip Form Paver Stone Crusher

55

Alat Bantu

Tamper Tandem Roller 6-8 T. Three Wheel Roller 6-8 T Tire Roller 8-10 T. Track Loader 75-100 Hp Trailer 20 Ton Tronton Truk Mixer (Agitator) Vibrating Rammer Vibratory Roller 5-8 T. Water Pump 70-100 mm Water Tanker 3000-4500 L. Welding Set Wheel Loader 1.0-1.6 M³ Pick UP Excavator Mini PC 50

Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Jam Kerja Ls

Catatan : - Sesuai harga yang berlaku dipasaran. - Harga satuan belum termasuk pajak yang berlaku. - Harga sewaktu-waktu bisa berubah Menyetujui, Plt. KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

Ir. FERRY T. SIWI, M.Si NIP. 19590626 199103 1 008

Satuan Jadi 2016

Halaman135 dari 266

N KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

AFTAR HARGA SATUAN ALAT JUMLAH (Rp.) 619,248.62 650,919.37 437,643.25 954,442.58 54,910.39 9,093,855.59 80,068.59 264,680.17 869,670.69 839,574.61 596,259.37 43,775.00 330,386.76 6,620,767.89 206,779.19 967,779.98 99,660.46 189,600.07 742,237.07 300,705.21 57,520.53 703,579.91 515,435.54 718,108.69 572,317.91 304,130.78 638,909.42 565,719.91 1,522,855.82 513,973.20 7,635,216.84

Satuan Jadi 2016

Halaman136 dari 266

47,194.27 736,668.69 103,436.20 296,432.22 1,781,936.99 606,183.11 808,590.94 61,977.24 504,341.19 249,122.82 481,567.34 328,166.42 581,657.21 530,728.76 731,760.86 62,080.14 451,596.74 54,990.52 300,741.40 138,331.99 588,594.06 208,943.64 331,959.55 200.00

Dibuat Oleh, CV. DAYA ABADI GEMILANG

ANNEKE I UNTU, ST Direktur

Satuan Jadi 2016

Halaman137 dari 266

LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANADO Nomor Tanggal Tentang

: : : Penetapan Standardisasi Harga Satuan Jadi di lingkungan Dinas Pekerjaan Umum Kota Manado 2016 DAFTAR ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN Sesuai Standar Nasional Indonesia

NO

URAIAN PEKERJAAN

I.

PEKERJAAN PERSIAPAN RSNI T-12-2002

1

1 m¹

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Pagar sementara dari kayu tinggi 2 meter Bambu / Dolken Semen PC Pasir Pasang / Beton Kerikil Beton

1.250 2.500 0.005 0.009

Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Residu

0.072 0.060 0.400

Btg Kg M³ M³ M³ Kg Lt

Tukang Kayu Pekerja Kepala Tukang Mandor

0.200 0.400 0.020 0.020

Hari / Org Hari / Org Hari / Org Hari / Org

14,770.00 1,269.98 260,700.00 326,015.00

18,462.50 3,174.94 1,303.50 2,934.14

4,500,000.00 24,500.00 38,395.00

324,000.00 1,470.00 15,358.00

125,000.00 100,000.00 150,000.00 120,000.00

25,000.00 40,000.00 3,000.00 2,400.00 437,103.07 43,710.31

Over Head, Keuntungan, Dll Biaya untuk 1 M' 2

1 m¹

Jumlah

480,813.38

Pagar sementara dari seng gelombang tinggi 2 meter Bambu / Dolken Semen PC Seng Gelombang BJLS 30 (uk. 180 x 90 x 0,3 cm) Pasir Pasang / Beton Kerikil Beton Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Cat Menie Kayu/Besi/Seng (Glotex Setara)

1.250 2.500 1.200 0.005 0.009 0.072 0.060 0.450

Btg Kg Lbr M³ M³ M³ Kg Kg

Tukang Kayu Pekerja Kepala Tukang Mandor

0.200 0.400 0.020 0.020

Hari / Org Hari / Org Hari / Org Hari / Org

14,770.00 1,269.98 65,000.00 260,700.00 326,015.00 4,500,000.00 24,500.00 60,000.00

18,462.50 3,174.94 78,000.00 1,303.50 2,934.14 324,000.00 1,470.00 27,000.00

125,000.00 100,000.00 150,000.00 120,000.00

25,000.00 40,000.00 3,000.00 2,400.00 526,745.07 52,674.51

Over Head, Keuntungan, Dll Biaya untuk 1 M' 3

1 m¹

Jumlah

579,419.58

Pagar sementara dari kawat duri tinggi 1.8 meter Bambu / Dolken

Harga Satuan Dinas PU Manado 2016

1.000

Btg

14,770.00

14,770.00

Halaman 138 dari 266 halaman

NO

URAIAN PEKERJAAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 1,269.98 23,625.00 260,700.00 326,015.00 24,500.00

2,539.95 590,625.00 1,303.50 2,934.14 1,470.00

Hari / Org Hari / Org Hari / Org Hari / Org

125,000.00 100,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

25,000.00 30,000.00 3,000.00 2,400.00 674,042.59 67,404.26

Biaya untuk 1 M'

741,446.84

Tukang Kayu Pekerja Kepala Tukang Mandor

1 m¹

SATUAN Kg Kg M³ M³ Kg

Semen PC Kawat duri Pasir Pasang / Beton Kerikil Beton Paku Kayu 2" s/d 6"

4

KOEFISIEN 2.000 25.000 0.005 0.009 0.060

0.200 0.300 0.020 0.020

Pengukuran dan Pemasangan Bouwplank Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Kayu Kelas IV (Kayu Telon, dll.)

0.012 0.020 0.007

M³ Kg M³

Tukang Kayu Pekerja Kepala Tukang Mandor

0.100 0.100 0.010 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

4,500,000.00 24,500.00 2,500,000.00

54,000.00 490.00 17,500.00

125,000.00 100,000.00 150,000.00 120,000.00

12,500.00 10,000.00 1,500.00 600.00 96,590.00 9,659.00

Over Head, Keuntungan, Dll Biaya untuk 1 M' 5

1 m²

Pembuatan kantor sementara, dengan lantai plesteran Bambu / Dolken Kayu Kelas III (Kayu Nantu, dll.) Kayu Kelas IV (Kayu Telon, dll.) Besi strip Semen PC Pasir Pasang / Beton Pasir Pasang / Beton Kerikil Beton Bata merah Seng Plat BJLS 20 Naco (Kerangka dan Daun) Kaca Polos 3 mm Kunci Tanam 2 Slag Plywood 4 mm

1 m²

1.250 0.180 0.850 1.100 35.000 0.150 0.100 0.150 30.000 0.250 2.000 0.080 0.150 0.060

Btg M³ M³ Kg Kg M³ M³ M³ Bh Lbr M² M² Bh Lbr

14,770.00 4,500,000.00 2,500,000.00 92,400.00 1,269.98 260,700.00 260,700.00 326,015.00 850.00 45,000.00 472,500.00 125,000.00 75,000.00 65,000.00

18,462.50 810,000.00 2,125,000.00 101,640.00 44,449.13 39,105.00 26,070.00 48,902.25 25,500.00 11,250.00 945,000.00 10,000.00 11,250.00 3,900.00

125,000.00 125,000.00 100,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

250,000.00 125,000.00 200,000.00 45,000.00 6,000.00 4,846,528.88 484,652.89

Biaya Untuk 1 M2

5,331,181.76

Tukang Kayu Tukang batu Pekerja Kepala Tukang Mandor

6

106,249.00

2.000 1.000 2.000 0.300 0.050

Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org

Pembuatan gudang semen dan alat-alat

Harga Satuan Dinas PU Manado 2016

Halaman 139 dari 266 halaman

NO

URAIAN PEKERJAAN

Bambu / Dolken Kayu Kelas III (Kayu Nantu, dll.) Semen PC Pasir Pasang / Beton Kerikil Beton Paku Kayu 2" s/d 6" Seng Gelombang BJLS 20

8

1 m²

1 m²

1 m²

Btg M³ Kg M³ M³ Kg Lbr

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

25,109.00 945,000.00 13,334.74 7,821.00 16,300.75 7,350.00 63,000.00

125,000.00 100,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

250,000.00 100,000.00 30,000.00 6,000.00 1,463,915.49 146,391.55

Biaya Untuk 1 M2

1,610,307.04

2.000 1.000 0.200 0.050

Hari / Org Hari / Org Hari / Org Hari / Org

Pembuatan rumah jaga/konstruksi kayu Bambu / Dolken Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Seng Gelombang BJLS 20

3.000 0.276 0.700 1.500

Btg M³ Kg Lbr

Tukang Kayu Pekerja Kepala Tukang Mandor

1.500 1.000 0.150 0.050

Hari / Org Hari / Org Hari / Org Hari / Org

14,770.00 4,500,000.00 24,500.00 42,000.00

44,310.00 1,242,000.00 17,150.00 63,000.00

125,000.00 100,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

187,500.00 100,000.00 22,500.00 6,000.00 1,682,460.00 168,246.00

Biaya Untuk 1 M2

1,850,706.00

Membersihkan lapangan dan perataan Pekerja Mandor

9

1.700 0.210 10.500 0.030 0.050 0.300 1.500

SATUAN

14,770.00 4,500,000.00 1,269.98 260,700.00 326,015.00 24,500.00 42,000.00

Tukang Kayu Pekerja Kepala Tukang Mandor

7

KOEFISIEN

0.100 0.050

Hari / Org Hari / Org

100,000.00 120,000.00

Over Head, Keuntungan, Dll

10,000.00 6,000.00 16,000.00 1,600.00

Biaya Untuk 1 M2

17,600.00

Pembuatan bedeng buruh Bambu / Dolken Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Semen PC Pasir Pasang / Beton Kerikil Beton Seng Gelombang BJLS 20 Plywood 4 mm

Tukang Kayu Pekerja Kepala Tukang Mandor

Harga Satuan Dinas PU Manado 2016

1.250 0.186 0.300 18.000 0.030 0.050 1.500 1.350

2.000 1.000 0.200 0.050

Btg M³ Kg Kg M³ M³ Lbr Lbr

Hari / Org Hari / Org Hari / Org Hari / Org

14,770.00 4,500,000.00 24,500.00 1,269.98 260,700.00 326,015.00 42,000.00 65,000.00

18,462.50 837,000.00 7,350.00 22,859.55 7,821.00 16,300.75 63,000.00 87,750.00

125,000.00 100,000.00 150,000.00 120,000.00

250,000.00 100,000.00 30,000.00 6,000.00

Halaman 140 dari 266 halaman

NO

10

11

12

13

URAIAN PEKERJAAN

1 m²

1 m²

1 m²

1 m³

1 m³

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

1,446,543.80 144,654.38

Biaya Untuk 1 M2

1,591,198.18

Pembuatan bak adukan ukuran (40 x 50 x 20) cm Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Kaso 3/5

0.036 0.080 1.000

M³ Kg Btg

Tukang Kayu Mandor

0.300 0.002

Hari / Org Hari / Org

4,500,000.00 24,500.00 27,500.00

162,000.00 1,960.00 27,500.00

125,000.00 120,000.00

Over Head, Keuntungan, Dll

37,500.00 180.00 229,140.00 22,914.00

Biaya Untuk 1 M2

252,054.00

Pembuatan Stegger dari bambu, ukuran (40 x 50 x 20) cm Bambu / Dolken Tali ijuk

1.000 0.250

Btg Kg

14,770.00 75,000.00

14,770.00 18,750.00

Tukang Kayu Pekerja Kepala Tukang Mandor

0.017 0.250 0.002 0.013

Hari / Org Hari / Org Hari / Org Hari / Org

125,000.00 100,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

2,125.00 25,000.00 300.00 1,560.00 62,505.00 6,250.50

Biaya Untuk 1 M2

68,755.50

Pembuatan jalan sementara Batu Belah Uk. 15 - 20 Agregat Pecah Mesin 50-70 mm Pasir Pasang / Beton

0.150 0.090 0.010

M³ M3 M³

240,000.00 459,380.00 260,700.00

36,000.00 41,344.20 2,607.00

Pekerja Mandor

1.000 0.050

Hari / Org Hari / Org

100,000.00 120,000.00

Over Head, Keuntungan, Dll

100,000.00 6,000.00 185,951.20 18,595.12

Biaya Untuk 1 M2

204,546.32

Bongkaran beton bertulang Pekerja Mandor

14

KOEFISIEN

6.667 0.333

Hari / Org Hari / Org

100,000.00 120,000.00

Over Head, Keuntungan, Dll

666,700.00 39,960.00 706,660.00 70,666.00

Biaya Untuk 1 M3

777,326.00

Bongkaran dinding tembok bata merah Pekerja

Harga Satuan Dinas PU Manado 2016

6.667

Hari / Org

100,000.00

666,700.00

Halaman 141 dari 266 halaman

NO

URAIAN PEKERJAAN Mandor

15

1 m¹

II. 1

0.333

SATUAN Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

39,960.00 706,660.00 70,666.00

Biaya Untuk 1 M3

777,326.00

120,000.00

Pasang pagar kawat jaring galvanis, tinggi 1.00 m Kawat jaring galvanis

0.434



50,000.00

21,700.00

Tukang Pekerja Kepala Tukang Mandor

0.042 0.042 0.004 0.002

Hari / Org Hari / Org Hari / Org Hari / Org

125,000.00 100,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

5,250.00 4,200.00 600.00 240.00 31,990.00 3,199.00

Biaya Untuk 1 M'

35,189.00

PEKERJAAN TANAH SNI 2835:2008 1 m³

Galian tanah biasa sedalam 1 meter Pekerja Mandor

2

KOEFISIEN

1 m³

0.750 0.025

Hari / Org Hari / Org

100,000.00 120,000.00

Over Head, Keuntungan, Dll

75,000.00 3,000.00 78,000.00 7,800.00

Biaya Untuk 1 M3

85,800.00

Galian tanah biasa sedalam 2 meter Pekerja Mandor

0.900 0.045

Hari / Org Hari / Org

100,000.00 120,000.00

Over Head, Keuntungan, Dll Biaya Untuk 1 M3 3

1 m³

1 m³

1 m³

1.050 0.067

Hari / Org Hari / Org

Over Head, Keuntungan, Dll

105,000.00 8,040.00 113,040.00 11,304.00

Biaya Untuk 1 M3

124,344.00

100,000.00 120,000.00

Galian tanah keras sedalam 1 meter Pekerja Mandor

5

104,940.00

Galian tanah biasa sedalam 3 meter Pekerja Mandor

4

90,000.00 5,400.00 95,400.00 9,540.00

1.000 0.032

Hari / Org Hari / Org

100,000.00 120,000.00

Over Head, Keuntungan, Dll

100,000.00 3,840.00 103,840.00 10,384.00

Biaya Untuk 1 M3

114,224.00

Galian tanah cadas sedalam 1 meter

Harga Satuan Dinas PU Manado 2016

Halaman 142 dari 266 halaman

NO

URAIAN PEKERJAAN Pekerja Mandor

6

1 m³

1 m²

1 m³

Biaya Untuk 1 M3

172,920.00

1 m³

1 m³

Over Head, Keuntungan, Dll Biaya Untuk 1 M3

137,940.00

1 m³

100,000.00 120,000.00

Pekerjaan stripping setinggi 1 meter

Over Head, Keuntungan, Dll Biaya Untuk 1 M2

6,160.00

Pembuangan tanah sejauh 30 meter

0.050 0.005

Hari / Org Hari / Org

5,000.00 600.00 5,600.00 560.00

100,000.00 120,000.00

1 m3 Pembuangan 0.330 0.010

Hari / Org Hari / Org

Over Head, Keuntungan, Dll

33,000.00 1,200.00 34,200.00 3,420.00

Biaya Untuk 1 M3

37,620.00

100,000.00 120,000.00

Urugan kembali 0.250 0.008

Hari / Org Hari / Org

Over Head, Keuntungan, Dll

25,000.00 1,000.00 26,000.00 2,600.00

Biaya Untuk 1 M3

28,600.00

100,000.00 120,000.00

Pemadatan tanah (per 20 cm) Pekerja Mandor

11

1.200 0.045

Hari / Org Hari / Org

120,000.00 5,400.00 125,400.00 12,540.00

Pekerja Mandor

10

100,000.00 120,000.00

Galian tanah lumpur sedalam 1 meter

Pekerja Mandor

9

Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

Pekerja Mandor

8

1.500 0.060

SATUAN

150,000.00 7,200.00 157,200.00 15,720.00

Pekerja Mandor

7

KOEFISIEN

0.500 0.050

Hari / Org Hari / Org

100,000.00 120,000.00

Over Head, Keuntungan, Dll

50,000.00 6,000.00 56,000.00 5,600.00

Biaya Untuk 1 M3

61,600.00

Timbunan tanah dan pemadatan ( manual ) Tanah Biasa

1.200



64,330.00

77,196.00

Pekerja Mandor

0.420 0.014

Hari / Org Hari / Org

100,000.00 120,000.00

42,000.00 1,680.00 120,876.00 12,087.60

Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2016

Halaman 143 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Biaya Untuk 1 M3 12

13

14

15

16

1 m³

1 m³

1 m³

1 m³

1 m³

132,963.60

Urugan pasir Pasir Kasar/ Urug

1.200



205,000.00

246,000.00

Pekerja Mandor

0.300 0.010

Hari / Org Hari / Org

100,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 1,200.00 277,200.00 27,720.00

Biaya Untuk 1 M3

304,920.00

Lapisan pudel campuran 1 Kp : 3 Ps : 7 TL Pasir Kasar/ Urug Kapur padam Tanah liat

0.330 0.109 0.763

M³ M³ M³

205,000.00 245,460.00 59,065.00

67,650.00 26,755.14 45,066.60

Pekerja Tukang batu Kepala Tukang Mandor

0.833 0.416 0.040 0.083

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

83,300.00 52,000.00 6,000.00 9,960.00 290,731.74 29,073.17

Biaya Untuk 1 M3

319,804.91

Lapisan pudel campuran 1 Kp : 5 TL Kapur padam Tanah liat

0.200 1.000

M³ M³

245,460.00 59,065.00

49,092.00 59,065.00

Pekerja Tukang batu Kepala Tukang Mandor

0.833 0.416 0.041 0.081

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

83,300.00 52,000.00 6,150.00 9,720.00 259,327.00 25,932.70

Biaya Untuk 1 M3

285,259.70

Pemasangan lapisan ijuk Ijuk

6.000



46,200.00

277,200.00

Pekerja Mandor

0.150 0.015

Hari / Org Hari / Org

100,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 1,800.00 294,000.00 29,400.00

Biaya Untuk 1 M3

323,400.00

Urugan sirtu Sirtu Alam

Harga Satuan Dinas PU Manado 2016

1.200



151,435.00

181,722.00

Halaman 144 dari 266 halaman

NO

URAIAN PEKERJAAN

Pekerja Mandor

17

1 m²

III.

1

KOEFISIEN

0.250 0.025

SATUAN

Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

100,000.00 120,000.00

Over Head, Keuntungan, Dll

25,000.00 3,000.00 209,722.00 20,972.20

Biaya Untuk 1 M3

230,694.20

Pembuatan jalan sementara, tebal 25 cm Batu Belah Uk. 15 - 20 Kerikil Koral Uk. 1 - 3 cm Pasir Kasar/ Urug

0.275 0.030 0.050

M³ M³ M³

240,000.00 326,015.00 205,000.00

66,000.00 9,780.45 10,250.00

Pekerja Mandor

1.000 0.100

Hari / Org Hari / Org

100,000.00 120,000.00

Over Head, Keuntungan, Dll

100,000.00 12,000.00 198,030.45 19,803.05

Biaya Untuk 1 M2

217,833.50

PEKERJAAN PONDASI

1 m³

Pasang pondasi batu kali, 1 Pc : 3 Ps Batu Belah Uk. 15 - 20 Semen PC Pasir Pasang / Beton

Pekerja Tukang batu Kepala Tukang Mandor

1.200 202.000 0.485

1.500 0.750 0.075 0.075

M³ Kg M³

240,000.00 1,269.98 260,700.00

288,000.00 256,534.95 126,439.50

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

150,000.00 93,750.00 11,250.00 9,000.00 934,974.45 93,497.45

Over Head, Keuntungan, Dll Biaya Untuk 1 M3 2

1 m³

Pasang pondasi batu kali, 1 Pc : 4 Ps M³ Kg M³

240,000.00 1,269.98 260,700.00

288,000.00 207,005.93 135,564.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

150,000.00 93,750.00 11,250.00 9,000.00 894,569.93 89,456.99

Biaya Untuk 1 M3

984,026.92

Batu Belah Uk. 15 - 20 Semen PC Pasir Pasang / Beton

Pekerja Tukang batu Kepala Tukang Mandor

3

1 m³

1,028,471.90

1.200 163.000 0.520

1.500 0.750 0.075 0.075

Pasang pondasi batu kali, 1 Pc : 5 Ps Batu Belah Uk. 15 - 20

Harga Satuan Dinas PU Manado 2016

1.200



240,000.00

288,000.00

Halaman 145 dari 266 halaman

NO

URAIAN PEKERJAAN

172,716.60 141,820.80

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

150,000.00 93,750.00 11,250.00 9,000.00 866,537.40 86,653.74

Biaya Untuk 1 M3

953,191.14

240,000.00 1,269.98 260,700.00

264,000.00 148,587.08 146,252.70

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

150,000.00 75,000.00 9,000.00 9,000.00 801,839.78 80,183.98

Biaya Untuk 1 M3

882,023.75

1.500 0.600 0.060 0.075

M³ Kg M³

240,000.00 1,269.98 260,700.00

264,000.00 115,567.73 146,252.70

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

150,000.00 75,000.00 9,000.00 9,000.00 768,820.43 76,882.04

Biaya Untuk 1 M3

845,702.47

Pekerja Tukang batu Kepala Tukang Mandor

1 m³

1.100 117.000 0.561

Pasang pondasi batu kali, 1 Pc : 8 Ps Batu Belah Uk. 15 - 20 Semen PC Pasir Pasang / Beton

6

1.500 0.750 0.075 0.075

M³ Kg M³

Pekerja Tukang batu Kepala Tukang Mandor

1 m³

136.000 0.544

Pasang pondasi batu kali, 1 Pc : 6 Ps Batu Belah Uk. 15 - 20 Semen PC Pasir Pasang / Beton

5

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 1,269.98 260,700.00

Pekerja Tukang batu Kepala Tukang Mandor

1 m³

SATUAN Kg M³

Semen PC Pasir Pasang / Beton

4

KOEFISIEN

1.100 91.000 0.561

1.500 0.600 0.060 0.075

Pasang pondasi batu kali, 1 Kp : 1 Sm : 2 Ps Batu Belah Uk. 15 - 20 Kapur Semen Warna Pasir Pasang / Beton

1.100 0.170 0.170 0.340

M³ M3 Kg M³

240,000.00 245,460.00 13,860.00 260,700.00

264,000.00 41,728.20 2,356.20 88,638.00

Pekerja Tukang batu Kepala Tukang Mandor

1.500 0.600 0.060 0.075

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

150,000.00 75,000.00 9,000.00 9,000.00 639,722.40 63,972.24

Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2016

Halaman 146 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Biaya Untuk 1 M3 7

1 m³

Pasang pondasi batu kali, 1 Pc : 1/4 Kp : 4 Ps M³ Kg M3 M³

240,000.00 1,269.98 245,460.00 260,700.00

264,000.00 198,116.10 7,854.72 152,248.80

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

150,000.00 75,000.00 9,000.00 9,000.00 865,219.62 86,521.96

Biaya Untuk 1 M3

951,741.58

Batu Belah Uk. 15 - 20 Semen PC Kapur Pasir Pasang / Beton

Pekerja Tukang batu Kepala Tukang Mandor

8

1 m³

240,000.00 1,269.98 245,460.00 260,700.00

264,000.00 77,468.48 36,082.62 128,264.40

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

150,000.00 75,000.00 9,000.00 9,000.00 748,815.50 74,881.55

Biaya Untuk 1 M3

823,697.04

1.500 0.600 0.060 0.075

M³ Kg M3 M³

240,000.00 1,269.98 245,460.00 260,700.00

264,000.00 52,068.98 32,155.26 136,346.10

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

150,000.00 75,000.00 9,000.00 9,000.00 727,570.34 72,757.03

Biaya Untuk 1 M3

800,327.37

Pekerja Tukang batu Kepala Tukang Mandor

1 m³

1.100 61.000 0.147 0.492

Pasang pondasi batu kali, 1/4 Pc : 1 Kp : 4 Ps Batu Belah Uk. 15 - 20 Semen PC Kapur Pasir Pasang / Beton

10

1.500 0.600 0.060 0.075

M³ Kg M3 M³

Pekerja Tukang batu Kepala Tukang Mandor

1 m³

1.100 156.000 0.032 0.584

Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps Batu Belah Uk. 15 - 20 Semen PC Kapur Pasir Pasang / Beton

9

703,694.64

1.100 41.000 0.131 0.523

1.500 0.600 0.060 0.075

Pasang pondasi batu kosong Batu Belah Uk. 15 - 20 Pasir Pasang / Beton

1.200 0.432

M³ M³

240,000.00 260,700.00

288,000.00 112,622.40

Pekerja Tukang batu

0.780 0.390

Hari / Org Hari / Org

100,000.00 125,000.00

78,000.00 48,750.00

Harga Satuan Dinas PU Manado 2016

Halaman 147 dari 266 halaman

NO

URAIAN PEKERJAAN Kepala Tukang Mandor

11

1 m³

Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll Biaya Untuk 1 M3

591,692.64

150,000.00 120,000.00

Pasang pond. siklop, 60 % beton campuran 1PC : 2 PB : 3 Kr dan 40% batu belah Kg M³ M³ M³ Kg Kg

1,269.98 260,700.00 240,000.00 260,800.00 11,700.00 24,000.00

246,375.15 81,338.40 117,600.00 122,054.40 1,474,200.00 19,200.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

300,000.00 106,250.00 12,750.00 18,000.00 2,497,767.95 249,776.80

Biaya Untuk 1 M3

2,747,544.75

Pekerja Tukang batu Kepala Tukang Mandor

1 m³

0.039 0.039

SATUAN

5,850.00 4,680.00 537,902.40 53,790.24

Semen PC Pasir Pasang / Beton Batu Belah Uk. 15 - 20 Batu Belah / Batu Kali / Batu Gunung Besi beton polos Kawat Beton / Bendrat

12

KOEFISIEN

194.000 0.312 0.490 0.468 126.000 0.800

3.000 0.850 0.085 0.150

Pasang pondasi sumuran diameter 100 cm Batu Belah Uk. 15 - 20 Semen PC Pasir Pasang / Beton Kerikil Beton

Pekerja Tukang batu Kepala Tukang Mandor

0.450 194.000 0.312 0.468

2.400 0.800 0.080 0.119

M³ Kg M³ M³

240,000.00 1,269.98 260,700.00 326,015.00

108,000.00 246,375.15 81,338.40 152,575.02

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

240,000.00 100,000.00 12,000.00 14,280.00 954,568.57 95,456.86

Over Head, Keuntungan, Dll Biaya Untuk 1 M3 13

1 m¹

1,050,025.43

Pembuatan tiang pancang (40 x 40) cm, beton bertulang Pasir Kasar/ Urug Pasir Pasang / Beton Kerikil Beton Semen PC Besi beton polos Kawat Beton / Bendrat Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Minyak bekisting Plamur Tembok (Danapaint Setara)

Pekerja Tukang batu

Harga Satuan Dinas PU Manado 2016

0.019 0.094 0.150 60.500 45.000 0.900 0.032 0.120 0.090 0.240

1.000 0.670

M³ M³ M³ Kg Kg Kg M³ Kg Ltr Kg

Hari / Org Hari / Org

205,000.00 260,700.00 326,015.00 1,269.98 11,700.00 24,000.00 4,500,000.00 24,500.00 12,410.00 51,000.00

3,895.00 24,505.80 48,902.25 76,833.49 526,500.00 21,600.00 144,000.00 2,940.00 1,116.90 12,240.00

100,000.00 125,000.00

100,000.00 83,750.00

Halaman 148 dari 266 halaman

NO

URAIAN PEKERJAAN Kepala Tukang Mandor

14

1 m¹

Biaya Untuk 1 M'

1,168,566.78

150,000.00 120,000.00

Pembuatan tiang pancang (35 x 35) cm, beton bertulang 0.016 0.080 0.125 49.000 34.500 0.700 0.027 0.120 0.090 0.200

M³ M³ M³ Kg Kg Kg M³ Kg Ltr Kg

205,000.00 260,700.00 326,015.00 1,269.98 11,700.00 24,000.00 4,500,000.00 24,500.00 12,410.00 51,000.00

3,280.00 20,856.00 40,751.88 62,228.78 403,650.00 16,800.00 121,500.00 2,940.00 1,116.90 10,200.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

80,000.00 62,500.00 7,500.00 4,800.00 838,123.55 83,812.36

Biaya Untuk 1 M'

921,935.91

0.800 0.500 0.050 0.040

Hari / Org Hari / Org Hari / Org Hari / Org

PEKERJAAN DINDING SNI 6897:2008 1 m²

Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps Bh Kg M³

850.00 1,269.98 260,700.00

119,000.00 55,243.91 20,856.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

60,000.00 250,000.00 3,000.00 3,600.00 511,699.91 51,169.99

Biaya Untuk 1 M2

562,869.90

Bata merah Semen PC Pasir Pasang / Beton

Pekerja Tukang batu Kepala Tukang Mandor

2

Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

Pekerja Tukang batu Kepala Tukang Mandor

1

0.067 0.050

SATUAN

10,050.00 6,000.00 1,062,333.44 106,233.34

Pasir Kasar/ Urug Pasir Pasang / Beton Kerikil Beton Semen PC Besi beton polos Kawat Beton / Bendrat Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Minyak bekisting Plamur Tembok (Danapaint Setara)

IV.

KOEFISIEN

1 m²

140.000 43.500 0.080

0.600 2.000 0.020 0.030

Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps Bata merah Semen PC Pasir Pasang / Beton

Pekerja Tukang batu Kepala Tukang Mandor

Harga Satuan Dinas PU Manado 2016

140.000 32.950 0.091

0.600 2.000 0.020 0.030

Bh Kg M³

850.00 1,269.98 260,700.00

119,000.00 41,845.68 23,723.70

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

60,000.00 250,000.00 3,000.00 3,600.00

Halaman 149 dari 266 halaman

NO

3

URAIAN PEKERJAAN

1 m²

Biaya Untuk 1 M2

551,286.31

Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps Bh Kg M³

850.00 1,269.98 260,700.00

119,000.00 33,717.84 24,245.10

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

60,000.00 25,000.00 3,000.00 3,600.00 268,562.94 26,856.29

Biaya Untuk 1 M2

295,419.23

850.00 1,269.98 260,700.00

119,000.00 28,193.45 26,591.40

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

60,000.00 25,000.00 3,000.00 3,600.00 265,384.85 26,538.48

Biaya Untuk 1 M2

291,923.33

0.600 0.200 0.020 0.030

Bh Kg M³

850.00 1,269.98 260,700.00

119,000.00 23,494.54 26,643.54

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

60,000.00 25,000.00 3,000.00 3,600.00 260,738.08 26,073.81

Biaya Untuk 1 M2

286,811.89

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

140.000 22.200 0.102

Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps Bata merah Semen PC Pasir Pasang / Beton

6

0.600 0.200 0.020 0.030

Bh Kg M³

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

140.000 26.550 0.093

Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps Bata merah Semen PC Pasir Pasang / Beton

5

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 501,169.38 50,116.94

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

SATUAN

Over Head, Keuntungan, Dll

Bata merah Semen PC Pasir Pasang / Beton

4

KOEFISIEN

140.000 18.500 0.102

0.600 0.200 0.020 0.030

Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps Bata merah Semen PC Pasir Pasang / Beton Kapur

Harga Satuan Dinas PU Manado 2016

140.000 10.080 0.093 0.028

Bh Kg M³ M3

850.00 1,269.98 260,700.00 245,460.00

119,000.00 12,801.35 24,114.75 6,750.15

Halaman 150 dari 266 halaman

NO

URAIAN PEKERJAAN Pekerja Tukang batu Kepala Tukang Mandor

7

1 m²

Biaya Untuk 1 M2

279,692.87

Bh Kg M³

850.00 1,269.98 260,700.00

59,500.00 24,066.03 9,906.60

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 12,500.00 1,500.00 1,800.00 139,272.63 13,927.26

Biaya Untuk 1 M2

153,199.89

850.00 1,269.98 260,700.00

59,500.00 18,249.54 10,428.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 12,500.00 1,500.00 1,800.00 133,977.54 13,397.75

Biaya Untuk 1 M2

147,375.29

70.000 14.370 0.040

0.300 0.100 0.010 0.015

Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps Bh Kg M³

850.00 1,269.98 260,700.00

59,500.00 14,604.71 11,210.10

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 12,500.00 1,500.00 1,800.00 131,114.81 13,111.48

Biaya Untuk 1 M2

144,226.29

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

0.300 0.100 0.010 0.015

Bh Kg M³

Bata merah Semen PC Pasir Pasang / Beton

10

70.000 18.950 0.038

Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

100,000.00 125,000.00 150,000.00 120,000.00

Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps

Bata merah Semen PC Pasir Pasang / Beton

9

Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

0.600 0.200 0.020 0.030

SATUAN

60,000.00 25,000.00 3,000.00 3,600.00 254,266.25 25,426.62

Bata merah Semen PC Pasir Pasang / Beton

8

KOEFISIEN

70.000 11.500 0.043

0.300 0.100 0.010 0.015

Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps Bata merah

Harga Satuan Dinas PU Manado 2016

70.000

Bh

850.00

59,500.00

Halaman 151 dari 266 halaman

NO

11

URAIAN PEKERJAAN

1 m²

Kg M³

1,269.98 260,700.00

12,293.36 11,731.50

Pekerja Tukang batu Kepala Tukang Mandor

0.300 0.100 0.010 0.015

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 12,500.00 1,500.00 1,800.00 129,324.86 12,932.49

Biaya Untuk 1 M2

142,257.34

Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps Bh Kg M³

850.00 1,269.98 260,700.00

59,500.00 10,566.19 12,774.30

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 12,500.00 1,500.00 1,800.00 128,640.49 12,864.05

Biaya Untuk 1 M2

141,504.54

0.300 0.100 0.010 0.015

Bh Kg M³

850.00 1,269.98 260,700.00

59,500.00 8,254.84 13,035.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 12,500.00 1,500.00 1,800.00 126,589.84 12,658.98

Biaya Untuk 1 M2

139,248.82

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

70.000 8.320 0.049

Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps Bata merah Semen PC Pasir Pasang / Beton

13

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

9.680 0.045

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

SATUAN

Semen PC Pasir Pasang / Beton

Bata merah Semen PC Pasir Pasang / Beton

12

KOEFISIEN

70.000 6.500 0.050

0.300 0.100 0.010 0.015

Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps Bh Kg M³ M³

850.00 1,269.98 260,700.00 245,460.00

59,500.00 5,714.89 13,035.00 3,681.90

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 12,500.00 1,500.00 1,800.00 127,731.79 12,773.18

Biaya Untuk 1 M2

140,504.97

Bata merah Semen PC Pasir Pasang / Beton Kapur padam

Pekerja Tukang batu Kepala Tukang Mandor

Harga Satuan Dinas PU Manado 2016

70.000 4.500 0.050 0.015

0.300 0.100 0.010 0.015

Halaman 152 dari 266 halaman

NO

14

URAIAN PEKERJAAN

1 m²

850.00 13,860.00 260,700.00 245,460.00

59,500.00 249.48 4,692.60 4,418.28

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 12,500.00 1,500.00 1,800.00 114,660.36 11,466.04

Biaya Untuk 1 M2

126,126.40

850.00 13,860.00 260,700.00 245,460.00

59,500.00 194.04 7,299.60 3,436.44

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 12,500.00 1,500.00 1,800.00 116,230.08 11,623.01

Biaya Untuk 1 M2

127,853.09

70.000 0.014 0.028 0.014

0.300 0.100 0.010 0.015

PEKERJAAN PLESTERAN SNI 2837:2008 1 m²

Plesteran 1 Pc : 1 Ps, tebal 15 mm Kg M³

1,269.98 260,700.00

19,689.69 4,171.20

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 18,750.00 2,250.00 1,800.00 76,660.89 7,666.09

Biaya Untuk 1 M2

84,326.98

Semen PC Pasir Pasang / Beton

Pekerja Tukang batu Kepala Tukang Mandor

2

0.300 0.100 0.010 0.015

Bh Kg M³ M³

Pekerja Tukang batu Kepala Tukang Mandor

1

70.000 0.018 0.018 0.018

Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps Bata merah Semen warna Pasir Pasang / Beton Kapur padam

V.

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Bh Kg M³ M³

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

SATUAN

Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps Bata merah Semen warna Pasir Pasang / Beton Kapur padam

15

KOEFISIEN

1 m²

15.504 0.016

0.300 0.150 0.015 0.015

Plesteran 1 Pc : 2 Ps, tebal 15 mm Semen PC Pasir Pasang / Beton

Pekerja Tukang batu Kepala Tukang

Harga Satuan Dinas PU Manado 2016

10.224 0.020

0.300 0.150 0.015

Kg M³

1,269.98 260,700.00

12,984.22 5,214.00

Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00

30,000.00 18,750.00 2,250.00

Halaman 153 dari 266 halaman

NO

URAIAN PEKERJAAN Mandor

3

4

5

6

1 m²

1 m²

1 m²

1 m²

KOEFISIEN 0.015

SATUAN Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 120,000.00

Over Head, Keuntungan, Dll

1,800.00 70,998.22 7,099.82

Biaya Untuk 1 M2

78,098.05

Plesteran 1 Pc : 3 Ps, tebal 15 mm Semen PC Pasir Pasang / Beton

7.776 0.023

Kg M³

1,269.98 260,700.00

9,875.33 5,996.10

Pekerja Tukang batu Kepala Tukang Mandor

0.300 0.150 0.015 0.015

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 18,750.00 2,250.00 1,800.00 68,671.43 6,867.14

Biaya Untuk 1 M2

75,538.57

Plesteran 1 Pc : 4 Ps, tebal 15 mm Semen PC Pasir Pasang / Beton

6.240 0.024

Kg M³

1,269.98 260,700.00

7,924.64 6,256.80

Pekerja Tukang batu Kepala Tukang Mandor

0.300 0.150 0.015 0.015

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 18,750.00 2,250.00 1,800.00 66,981.44 6,698.14

Biaya Untuk 1 M2

73,679.59

Plesteran 1 Pc : 5 Ps, tebal 15 mm Semen PC Pasir Pasang / Beton

5.184 0.026

Kg M³

1,269.98 260,700.00

6,583.55 6,778.20

Pekerja Tukang batu Kepala Tukang Mandor

0.300 0.150 0.015 0.015

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 18,750.00 2,250.00 1,800.00 66,161.75 6,616.18

Biaya Untuk 1 M2

72,777.93

Plesteran 1 Pc : 6 Ps, tebal 15 mm Semen PC Pasir Pasang / Beton

4.416 0.027

Kg M³

1,269.98 260,700.00

5,608.21 7,038.90

Pekerja Tukang batu Kepala Tukang Mandor

0.300 0.150 0.015 0.015

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

30,000.00 18,750.00 2,250.00 1,800.00

Harga Satuan Dinas PU Manado 2016

Halaman 154 dari 266 halaman

NO

7

URAIAN PEKERJAAN

1 m²

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

65,447.11 6,544.71

Biaya Untuk 1 M2

71,991.82

Plesteran 1 Pc : 2 Ps ; tebal 20 mm Semen PC Pasir Pasang / Beton

Pekerja Tukang batu Kepala Tukang Mandor

13.632 0.027

Kg M³

1,269.98 260,700.00

17,312.30 7,038.90

0.400 0.200 0.020 0.022

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

40,000.00 25,000.00 3,000.00 2,640.00 94,991.20 9,499.12

Over Head, Keuntungan, Dll Biaya Untuk 1 M2

8

1 m²

Plesteran 1 Pc : 3 Ps ; tebal 20 mm 10.368 0.031

Kg M³

1,269.98 260,700.00

13,167.10 8,081.70

0.400 0.200 0.020 0.013

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

40,000.00 25,000.00 3,000.00 1,560.00 90,808.80 9,080.88

Biaya Untuk 1 M2

99,889.68

Semen PC Pasir Pasang / Beton

Pekerja Tukang batu Kepala Tukang Mandor

9

10

1 m²

1 m²

107,130.32

Plesteran 1 Pc : 4 Ps ; tebal 20 mm Semen PC Pasir Pasang / Beton

8.320 0.032

Kg M³

1,269.98 260,700.00

10,566.19 8,342.40

Pekerja Tukang batu Kepala Tukang Mandor

0.400 0.200 0.020 0.022

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

40,000.00 25,000.00 3,000.00 2,640.00 89,548.59 8,954.86

Biaya Untuk 1 M2

98,503.45

Plesteran 1 Pc : 5 Ps ; tebal 20 mm Semen PC Pasir Pasang / Beton

6.912 0.035

Kg M³

1,269.98 260,700.00

8,778.07 9,124.50

Pekerja

0.400

Hari / Org

100,000.00

40,000.00

Harga Satuan Dinas PU Manado 2016

Halaman 155 dari 266 halaman

NO

URAIAN PEKERJAAN Tukang batu Kepala Tukang Mandor

11

12

13

14

1 m²

1 m²

1 m²

1 m²

KOEFISIEN 0.200 0.020 0.022

SATUAN Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

25,000.00 3,000.00 2,640.00 88,542.57 8,854.26

Biaya Untuk 1 M2

97,396.82

Plesteran Skoning 1 PC : 2 PP, lebar 10 mm Semen PC Pasir Pasang / Beton

0.500 0.013

Kg M³

1,269.98 260,700.00

634.99 3,389.10

Pekerja Tukang batu Kepala Tukang Mandor

0.080 0.400 0.040 0.004

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

8,000.00 50,000.00 6,000.00 480.00 68,504.09 6,850.41

Biaya Untuk 1 M2

75,354.50

Plesteran siar timbul adukan 1 Pc : 2 Ps Semen PC Pasir Pasang / Beton

6.340 0.012

Kg M³

1,269.98 260,700.00

8,051.64 3,128.40

Pekerja Tukang batu Kepala Tukang Mandor

0.300 0.150 0.015 0.015

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

30,000.00 18,750.00 2,250.00 1,800.00 63,980.04 6,398.00

Biaya Untuk 1 M2

70,378.05

Acian Semen PC

3.250

Kg

Pekerja Tukang batu Kepala Tukang Mandor

0.200 0.100 0.010 0.010

Hari / Org Hari / Org Hari / Org Hari / Org

1,269.98

4,127.42

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

20,000.00 12,500.00 1,500.00 1,200.00 39,327.42 3,932.74

Biaya Untuk 1 M2

43,260.16

Acian Untuk Saluran Semen PC

1.500

Kg

Pekerja

0.100

Hari / Org

Harga Satuan Dinas PU Manado 2016

1,269.98

1,904.96

100,000.00

10,000.00

Halaman 156 dari 266 halaman

NO

URAIAN PEKERJAAN Tukang batu Kepala Tukang Mandor

V. 1

Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll Biaya Untuk 1 M2

22,346.46

125,000.00 150,000.00 120,000.00

PEKERJAAN PINTU DAN JENDELA SNI 3434:2008 1 m³

Membuat dan memasang kosen pintu, jendela, ventilasi, kayu Kls.I

1 m³

M³ Kg Kg

7.000 21.000 2.100 0.350

Hari / Org Hari / Org Hari / Org Hari / Org

11,000,000.00 30,625.00 45,000.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

700,000.00 2,625,000.00 315,000.00 42,000.00 14,757,625.00 1,475,762.50

Biaya Untuk 1 M3

16,233,387.50

Membuat dan memasang kosen pintu, jendela, ventilasi, kayu Kls.II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6" Lem kayu

1.200 1.250 1.000

M³ Kg Kg

6.000 18.000 1.800 0.300

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00 45,000.00

8,400,000.00 30,625.00 45,000.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

600,000.00 2,250,000.00 270,000.00 36,000.00 11,631,625.00 1,163,162.50

Biaya Untuk 1 M3

12,794,787.50

Pekerja Tukang kayu Kepala Tukang Mandor

1 m²

1.100 1.250 1.000

10,000,000.00 24,500.00 45,000.00

Pekerja Tukang kayu Kepala Tukang Mandor

3

0.050 0.008 0.008

SATUAN

6,250.00 1,200.00 960.00 20,314.96 2,031.50

Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6" Lem kayu

2

KOEFISIEN

Mermbuat dan memasang Pintu klamp standar, rangka kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6"

0.040 0.050

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.350 1.050 0.105 0.018

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00

280,000.00 1,225.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

35,000.00 131,250.00 15,750.00 2,160.00 465,385.00 46,538.50

Biaya Untuk 1 M2

511,923.50

Harga Satuan Dinas PU Manado 2016

Halaman 157 dari 266 halaman

NO

4

5

URAIAN PEKERJAAN

1 m²

1 m²

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Mermbuat dan memasang Pintu klamp sederhana, rangka kayu kelas III Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6"

0.040 0.050

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.350 1.050 0.105 0.018

Hari / Org Hari / Org Hari / Org Hari / Org

4,500,000.00 24,500.00

180,000.00 1,225.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

35,000.00 131,250.00 15,750.00 2,160.00 365,385.00 36,538.50

Biaya Untuk 1 M2

401,923.50

Membuat dan memasang pintu panel kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Lem kayu

0.040 0.500

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

1.000 3.000 0.300 0.050

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 45,000.00

400,000.00 22,500.00

100,000.00 125,000.00 150,000.00 120,000.00

100,000.00 375,000.00 45,000.00 6,000.00 948,500.00 94,850.00

Over Head, Keuntungan, Dll Biaya Untuk 1 M2

6

7

1 m²

1 m²

1,043,350.00

Membuat dan memasang pintu panel kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Lem kayu

0.040 0.500

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

1.000 3.000 0.300 0.050

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 45,000.00

280,000.00 22,500.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

100,000.00 375,000.00 45,000.00 6,000.00 828,500.00 82,850.00

Biaya Untuk 1 M2

911,350.00

Membuat dan memasang pintu dan jendela kaca kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Lem kayu

0.024 0.300

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.800 2.400 0.240 0.040

Hari / Org Hari / Org Hari / Org Hari / Org

Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2016

10,000,000.00 45,000.00

240,000.00 13,500.00

100,000.00 125,000.00 150,000.00 120,000.00

80,000.00 300,000.00 36,000.00 4,800.00 674,300.00 67,430.00

Halaman 158 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Biaya Untuk 1 M2

8

9

10

1 m²

1 m²

1 m²

741,730.00

Membuat dan memasang pintu dan jendela kaca kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Lem kayu

0.024 0.300

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.800 2.400 0.240 0.040

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 45,000.00

168,000.00 13,500.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

80,000.00 300,000.00 36,000.00 4,800.00 602,300.00 60,230.00

Biaya Untuk 1 M2

662,530.00

Membuat dan memasang pintu dan jendela jalusi kayu kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Lem kayu

0.064 0.500

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

1.000 3.000 0.300 0.050

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 45,000.00

640,000.00 22,500.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

100,000.00 375,000.00 45,000.00 6,000.00 1,188,500.00 118,850.00

Biaya Untuk 1 M2

1,307,350.00

Membuat dan memasang pintu dan jendela jalusi kayu kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Lem kayu

0.064 0.500

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

1.000 3.000 0.300 0.050

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 45,000.00

448,000.00 22,500.00

100,000.00 125,000.00 150,000.00 120,000.00

100,000.00 375,000.00 45,000.00 6,000.00 996,500.00 99,650.00

Over Head, Keuntungan, Dll Biaya Untuk 1 M2

11

1 m²

1,096,150.00

Pasang pintu plywood rangkap,rangka kayu kelas I (lebar sampai 90 cm) Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6" Lem kayu Plywood 4 mm

Harga Satuan Dinas PU Manado 2016

0.025 0.030 0.500 1.000

M³ Kg Kg Lbr

10,000,000.00 24,500.00 45,000.00 65,000.00

250,000.00 735.00 22,500.00 65,000.00

Halaman 159 dari 266 halaman

NO

URAIAN PEKERJAAN

Pekerja Tukang kayu Kepala Tukang Mandor

12

1 m²

KOEFISIEN

0.700 2.100 0.210 0.035

SATUAN

Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

70,000.00 262,500.00 31,500.00 4,200.00 706,435.00 70,643.50

Biaya Untuk 1 M2

777,078.50

Memasang jalusi kusen, kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6"

0.060 0.150

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.670 2.000 0.200 0.335

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00

600,000.00 3,675.00

100,000.00 125,000.00 150,000.00 120,000.00

67,000.00 250,000.00 30,000.00 40,200.00 990,875.00 99,087.50

Over Head, Keuntungan, Dll Biaya Untuk 1 M2

13

14

1 m²

1 m²

1,089,962.50

Memasang jalusi kusen, kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6"

0.060 0.150

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.670 2.000 0.200 0.335

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00

420,000.00 3,675.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

67,000.00 250,000.00 30,000.00 40,200.00 810,875.00 81,087.50

Biaya Untuk 1 M2

891,962.50

Pasang pintu plywood rangkap, rangka kayu kelas II (lebar sampai 90 cm) Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6" Lem kayu Plywood 4 mm

0.025 0.030 0.500 1.000

M³ Kg Kg Lbr

Pekerja Tukang kayu Kepala Tukang Mandor

0.700 2.100 0.210 0.035

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00 45,000.00 65,000.00

175,000.00 735.00 22,500.00 65,000.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

70,000.00 262,500.00 31,500.00 4,200.00 631,435.00 63,143.50

Biaya Untuk 1 M2

694,578.50

Harga Satuan Dinas PU Manado 2016

Halaman 160 dari 266 halaman

NO

15

16

17

18

URAIAN PEKERJAAN

1 m²

1 m²

1 m²

1 m²

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Pasang pintu plywood rangkap, rangka expose kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6" Lem kayu Plywood 4 mm

0.025 0.030 0.100 1.000

M³ Kg Kg Lbr

Pekerja Tukang kayu Kepala Tukang Mandor

0.800 2.400 0.240 0.040

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00 45,000.00 65,000.00

250,000.00 735.00 4,500.00 65,000.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

80,000.00 300,000.00 36,000.00 4,800.00 741,035.00 74,103.50

Biaya Untuk 1 M2

815,138.50

Pasang pintu plywood rangkap, rangka expose kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6" Lem kayu Plywood 4 mm

0.026 0.030 0.500 1.000

M³ Kg Kg Lbr

Pekerja Tukang kayu Kepala Tukang Mandor

0.800 2.400 0.240 0.040

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00 45,000.00 65,000.00

179,200.00 735.00 22,500.00 65,000.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

80,000.00 300,000.00 36,000.00 4,800.00 688,235.00 68,823.50

Biaya Untuk 1 M2

757,058.50

Pasang pintu teakwood rangkap, rangka kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6" Lem kayu Teakwood 4x8

0.025 0.030 0.500 1.000

M³ Kg Kg Lbr

Pekerja Tukang kayu Kepala Tukang Mandor

0.700 2.100 0.210 0.035

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00 45,000.00 110,000.00

250,000.00 735.00 22,500.00 110,000.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

70,000.00 262,500.00 31,500.00 4,200.00 751,435.00 75,143.50

Biaya Untuk 1 M2

826,578.50

Pasang pintu teakwood rangkap, rangka kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6" Lem kayu

Harga Satuan Dinas PU Manado 2016

0.025 0.030 0.500

M³ Kg Kg

7,000,000.00 24,500.00 45,000.00

175,000.00 735.00 22,500.00

Halaman 161 dari 266 halaman

NO

19

20

21

URAIAN PEKERJAAN

1 m²

1 m²

1 m²

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Teakwood 4x8

1.000

Lbr

110,000.00

110,000.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.700 2.100 0.210 0.035

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

70,000.00 262,500.00 31,500.00 4,200.00 676,435.00 67,643.50

Biaya Untuk 1 M2

744,078.50

Pasang pintu teakwood rangkap, rangka expose kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6" Lem kayu Teakwood 4x8

0.025 0.030 0.300 1.000

M³ Kg Kg Lbr

Pekerja Tukang kayu Kepala Tukang Mandor

0.800 2.400 0.240 0.040

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00 45,000.00 110,000.00

250,000.00 735.00 13,500.00 110,000.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

80,000.00 300,000.00 36,000.00 4,800.00 795,035.00 79,503.50

Biaya Untuk 1 M2

874,538.50

Pasang pintu teakwood rangkap, rangka expose kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6" Lem kayu Teakwood 4x8

0.025 0.030 0.300 1.000

M³ Kg Kg Lbr

Pekerja Tukang kayu Kepala Tukang Mandor

0.800 2.400 0.240 0.040

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00 45,000.00 110,000.00

175,000.00 735.00 13,500.00 110,000.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

80,000.00 300,000.00 36,000.00 4,800.00 720,035.00 72,003.50

Biaya Untuk 1 M2

792,038.50

Pasang pintu teakwood rangkap & formika rangka expose kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6" Lem kayu Teakwood 4x8 Formica

Harga Satuan Dinas PU Manado 2016

0.025 0.030 0.800 1.000 0.500

M³ Kg Kg Lbr Lbr

10,000,000.00 24,500.00 45,000.00 110,000.00 82,690.00

250,000.00 735.00 36,000.00 110,000.00 41,345.00

Halaman 162 dari 266 halaman

NO

URAIAN PEKERJAAN Pekerja Tukang kayu Kepala Tukang Mandor

22

23

24

1 m²

1 m³

1 m³

KOEFISIEN 0.800 2.400 0.240 0.040

SATUAN Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

80,000.00 300,000.00 36,000.00 4,800.00 858,880.00 85,888.00

Biaya Untuk 1 M2

944,768.00

Pasang pintu teakwood rangkap & formika rangka expose kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6" Lem kayu Teakwood 4x8 Formica

0.025 0.030 0.800 1.000 0.500

M³ Kg Kg Lbr Lbr

Pekerja Tukang kayu Kepala Tukang Mandor

0.800 2.400 0.240 0.040

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00 45,000.00 110,000.00 82,690.00

175,000.00 735.00 36,000.00 110,000.00 41,345.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

80,000.00 300,000.00 36,000.00 4,800.00 783,880.00 78,388.00

Biaya Untuk 1 M2

862,268.00

Pasang konstruksi kuda-kuda kayu jati Kayu Kelas I (Kayu Besi, dll.) Besi strip Paku Kayu 2" s/d 6"

1.100 15.000 5.600

M³ Kg Kg

Pekerja Tukang kayu Kepala Tukang Mandor

4.000 12.000 1.200 0.200

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 92,400.00 24,500.00

11,000,000.00 1,386,000.00 137,200.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

400,000.00 1,500,000.00 180,000.00 24,000.00 14,627,200.00 1,462,720.00

Biaya Untuk 1 M3

16,089,920.00

Pasang konstruksi kuda-kuda kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Besi strip Paku Kayu 2" s/d 6"

1.100 15.000 5.600

M³ Kg Kg

Pekerja Tukang kayu Kepala Tukang Mandor

4.000 12.000 1.200 0.200

Hari / Org Hari / Org Hari / Org Hari / Org

Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2016

10,000,000.00 92,400.00 24,500.00

11,000,000.00 1,386,000.00 137,200.00

100,000.00 125,000.00 150,000.00 120,000.00

400,000.00 1,500,000.00 180,000.00 24,000.00 14,627,200.00 1,462,720.00

Halaman 163 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Biaya Untuk 1 M3

25

26

27

28

1 m³

1 m³

1 m²

1 m²

16,089,920.00

Pasang konstruksi kuda-kuda kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Besi strip Paku Kayu 2" s/d 6"

1.100 15.000 5.600

M³ Kg Kg

Pekerja Tukang kayu Kepala Tukang Mandor

4.000 12.000 1.200 0.200

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 92,400.00 24,500.00

7,700,000.00 1,386,000.00 137,200.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

400,000.00 1,500,000.00 180,000.00 24,000.00 11,327,200.00 1,132,720.00

Biaya Untuk 1 M3

12,459,920.00

Pasang konstruksi kuda-kuda kayu kelas III Kayu Kelas III (Kayu Nantu, dll.) Besi strip Paku Kayu 2" s/d 6"

1.100 15.000 5.600

M³ Kg Kg

Pekerja Tukang kayu Kepala Tukang Mandor

4.000 12.000 1.200 0.200

Hari / Org Hari / Org Hari / Org Hari / Org

4,500,000.00 92,400.00 24,500.00

4,950,000.00 1,386,000.00 137,200.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

400,000.00 1,500,000.00 180,000.00 24,000.00 8,577,200.00 857,720.00

Biaya Untuk 1 M3

9,434,920.00

Pasang kaso + reng genteng kodok kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6"

0.012 0.150

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.100 0.100 0.010 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00

120,000.00 3,675.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

10,000.00 12,500.00 1,500.00 600.00 148,275.00 14,827.50

Biaya Untuk 1 M2

163,102.50

Pasang kaso + reng genteng kodok kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6"

Harga Satuan Dinas PU Manado 2016

0.012 0.150

M³ Kg

7,000,000.00 24,500.00

84,000.00 3,675.00

Halaman 164 dari 266 halaman

NO

URAIAN PEKERJAAN Pekerja Tukang kayu Kepala Tukang Mandor

29

30

31

32

1 m²

1 m²

1 m²

1 m²

KOEFISIEN 0.100 0.100 0.010 0.005

SATUAN Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

10,000.00 12,500.00 1,500.00 600.00 112,275.00 11,227.50

Biaya Untuk 1 M2

123,502.50

Pasang kaso + reng genteng monier kayu jati Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6"

0.014 0.150

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.100 0.100 0.010 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00

140,000.00 3,675.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

10,000.00 12,500.00 1,500.00 600.00 168,275.00 16,827.50

Biaya Untuk 1 M2

185,102.50

Pasang kaso + reng genteng monier kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6"

0.014 0.150

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.100 0.100 0.010 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00

140,000.00 3,675.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

10,000.00 12,500.00 1,500.00 600.00 168,275.00 16,827.50

Biaya Untuk 1 M2

185,102.50

Pasang kaso + reng genteng beton kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6"

0.014 0.150

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.100 0.100 0.010 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00

98,000.00 3,675.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

10,000.00 12,500.00 1,500.00 600.00 126,275.00 12,627.50

Biaya Untuk 1 M2

138,902.50

Pasang kaso + reng atap sirap kayu kelas I Kayu Kelas I (Kayu Besi, dll.)

Harga Satuan Dinas PU Manado 2016

0.165



10,000,000.00

1,650,000.00

Halaman 165 dari 266 halaman

NO

33

34

35

URAIAN PEKERJAAN

1 m²

1 m²

1 m²

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Paku Kayu 2" s/d 6"

0.200

Kg

24,500.00

4,900.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.120 0.120 0.012 0.006

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

12,000.00 15,000.00 1,800.00 720.00 1,684,420.00 168,442.00

Biaya Untuk 1 M2

1,852,862.00

Pasang kaso + reng atap sirap kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6"

0.165 0.200

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.120 0.120 0.012 0.006

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00

1,155,000.00 4,900.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

12,000.00 15,000.00 1,800.00 720.00 1,189,420.00 118,942.00

Biaya Untuk 1 M2

1,308,362.00

Pasang rangka langit-langit (1,00 x 1,00) m, kayu jati Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6"

0.012 0.100

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.150 0.250 0.025 0.075

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00

120,000.00 2,450.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 31,250.00 3,750.00 9,000.00 181,450.00 18,145.00

Biaya Untuk 1 M2

199,595.00

Pasang rangka langit-langit (1,00 x 1,00) m, kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6"

0.012 0.100

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.150 0.250 0.025 0.075

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00

120,000.00 2,450.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 31,250.00 3,750.00 9,000.00 181,450.00 18,145.00

Biaya Untuk 1 M2

199,595.00

Harga Satuan Dinas PU Manado 2016

Halaman 166 dari 266 halaman

NO 36

37

38

39

URAIAN PEKERJAAN 1 m²

1 m²

1 m²

1 m²

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Pasang rangka langit-langit (1,00 x 1,00) m, kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6"

0.012 0.100

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.150 0.250 0.025 0.075

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00

84,000.00 2,450.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 31,250.00 3,750.00 9,000.00 145,450.00 14,545.00

Biaya Untuk 1 M2

159,995.00

Pasang rangka langit-langit (30 x 60) cm, kayu jati Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6"

0.023 0.150

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.200 0.300 0.030 0.010

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00

230,000.00 3,675.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

20,000.00 37,500.00 4,500.00 1,200.00 296,875.00 29,687.50

Biaya Untuk 1 M2

326,562.50

Pasang Rangka langit-langit 50 x 100 cm, kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6"

0.015 0.200

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.150 0.300 0.030 0.075

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00

107,800.00 4,900.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 37,500.00 4,500.00 9,000.00 178,700.00 17,870.00

Biaya Untuk 1 M2

196,570.00

Pasang Rangka langit-langit 50 x 100 cm, kayu kelas III Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6"

0.015 0.200

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.150 0.300 0.030 0.075

Hari / Org Hari / Org Hari / Org Hari / Org

Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2016

4,500,000.00 24,500.00

69,300.00 4,900.00

100,000.00 125,000.00 150,000.00 120,000.00

15,000.00 37,500.00 4,500.00 9,000.00 140,200.00 14,020.00

Halaman 167 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Biaya Untuk 1 M2

40

41

42

43

1 m²

1 m²

1 m²

1 m¹

154,220.00

Pasang Rangka plafon 60 x 60 cm, kayu kls II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6"

0.016 0.250

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.200 0.300 0.030 0.010

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00

114,100.00 6,125.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

20,000.00 37,500.00 4,500.00 1,200.00 183,425.00 18,342.50

Biaya Untuk 1 M2

201,767.50

Pasang Rangka plafon 60 x 60 cm, kayu kls III Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6"

0.016 0.250

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.200 0.300 0.030 0.010

Hari / Org Hari / Org Hari / Org Hari / Org

4,500,000.00 24,500.00

73,350.00 6,125.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

20,000.00 37,500.00 4,500.00 1,200.00 142,675.00 14,267.50

Biaya Untuk 1 M2

156,942.50

Pasang rangka langit-langit (30 x 30) cm, kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6"

0.027 0.200

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.250 0.350 0.035 0.013

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00

189,000.00 4,900.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

25,000.00 43,750.00 5,250.00 1,500.00 269,400.00 26,940.00

Biaya Untuk 1 M2

296,340.00

Pasang lisplang ukuran (3 x 20) cm, kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6"

0.011 0.100

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.100 0.200 0.020 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

Harga Satuan Dinas PU Manado 2016

10,000,000.00 24,500.00

108,000.00 2,450.00

100,000.00 125,000.00 150,000.00 120,000.00

10,000.00 25,000.00 3,000.00 600.00

Halaman 168 dari 266 halaman

NO

44

45

46

47

URAIAN PEKERJAAN

1 m¹

1 m¹

1 m¹

1 m¹

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

149,050.00 14,905.00

Biaya Untuk 1 M'

163,955.00

Pasang lisplang ukuran (3 x 20) cm, kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6"

0.011 0.100

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.100 0.200 0.020 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00

75,600.00 2,450.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

10,000.00 25,000.00 3,000.00 600.00 116,650.00 11,665.00

Biaya Untuk 1 M'

128,315.00

Pasang lisplang ukuran (3 x 30) cm, kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6"

0.011 0.050

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.100 0.200 0.020 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00

110,000.00 1,225.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

10,000.00 25,000.00 3,000.00 600.00 149,825.00 14,982.50

Biaya Untuk 1 M'

164,807.50

Pasang lisplang ukuran (3 x 30) cm, kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6"

0.011 0.050

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.100 0.200 0.020 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00

77,000.00 1,225.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

10,000.00 25,000.00 3,000.00 600.00 116,825.00 11,682.50

Biaya Untuk 1 M'

128,507.50

Pasang lisplang ukuran 2 x (3 x 20) cm, kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6"

0.015 0.060

M³ Kg

Pekerja

0.150

Hari / Org

Harga Satuan Dinas PU Manado 2016

10,000,000.00 24,500.00

145,000.00 1,470.00

100,000.00

15,000.00

Halaman 169 dari 266 halaman

NO

URAIAN PEKERJAAN Tukang kayu Kepala Tukang Mandor

48

49

1 m¹

1 m¹

KOEFISIEN 0.250 0.025 0.075

SATUAN Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

31,250.00 3,750.00 9,000.00 205,470.00 20,547.00

Biaya Untuk 1 M'

226,017.00

Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6"

0.009 0.060

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.100 0.100 0.010 0.050

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00

86,000.00 1,470.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

10,000.00 12,500.00 1,500.00 6,000.00 117,470.00 11,747.00

Biaya Untuk 1 M'

129,217.00

Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6"

0.009 0.060

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.100 0.100 0.010 0.050

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00

61,600.00 1,470.00

100,000.00 125,000.00 150,000.00 120,000.00

10,000.00 12,500.00 1,500.00 6,000.00 93,070.00 9,307.00

Over Head, Keuntungan, Dll Biaya Untuk 1 M'

50

51

1 m²

1 m²

102,377.00

Pasang Rangka dinding pemisah (60x120) cm kayu kls. I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6"

0.028 0.150

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.150 0.450 0.045 0.008

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00

280,000.00 3,675.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 56,250.00 6,750.00 960.00 362,635.00 36,263.50

Biaya Untuk 1 M2

398,898.50

Pasang Rangka dinding pemisah (60x120) cm kayu kls. II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6"

Harga Satuan Dinas PU Manado 2016

0.028 0.150

M³ Kg

7,000,000.00 24,500.00

196,000.00 3,675.00

Halaman 170 dari 266 halaman

NO

URAIAN PEKERJAAN

Pekerja Tukang kayu Kepala Tukang Mandor

52

53

54

1 m²

1 m²

1 m²

KOEFISIEN

0.150 0.450 0.045 0.008

SATUAN

Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 56,250.00 6,750.00 960.00 278,635.00 27,863.50

Biaya Untuk 1 M2

306,498.50

Pasang Rangka dinding pemisah (60x120) cm kayu kls. III Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6"

0.028 0.150

M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.150 0.450 0.045 0.008

Hari / Org Hari / Org Hari / Org Hari / Org

4,500,000.00 24,500.00

126,000.00 3,675.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 56,250.00 6,750.00 960.00 208,635.00 20,863.50

Biaya Untuk 1 M2

229,498.50

Pasang dinding pemisah teakwood rangkap, rangka kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6" Teakwood 4x8 Lem kayu

0.028 0.150 0.860 0.560

M³ Kg Lbr Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.150 0.450 0.045 0.075

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00 110,000.00 45,000.00

280,000.00 3,675.00 94,600.00 25,200.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 56,250.00 6,750.00 9,000.00 490,475.00 49,047.50

Biaya Untuk 1 M2

539,522.50

Pasang dinding pemisah teakwood rangkap, rangka kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6" Teakwood 4x8 Lem kayu

0.028 0.150 0.860 0.560

M³ Kg Lbr Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.150 0.450 0.045 0.075

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00 110,000.00 45,000.00

196,000.00 3,675.00 94,600.00 25,200.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 56,250.00 6,750.00 9,000.00 406,475.00 40,647.50

Biaya Untuk 1 M2

447,122.50

Harga Satuan Dinas PU Manado 2016

Halaman 171 dari 266 halaman

NO

55

56

57

58

URAIAN PEKERJAAN

1 m²

1 m²

1 m²

1 m²

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Pasang dinding pemisah plywood rangkap, rangka kayu kelas I Kayu Kelas I (Kayu Besi, dll.) Paku Kayu 2" s/d 6" Plywood 4 mm Lem kayu

0.028 0.150 0.860 0.560

M³ Kg Lbr Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.200 0.600 0.060 0.010

Hari / Org Hari / Org Hari / Org Hari / Org

10,000,000.00 24,500.00 65,000.00 45,000.00

280,000.00 3,675.00 55,900.00 25,200.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

20,000.00 75,000.00 9,000.00 1,200.00 469,975.00 46,997.50

Biaya Untuk 1 M2

516,972.50

Pasang dinding pemisah plywood rangkap, rangka kayu kelas II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6" Plywood 4 mm Lem kayu

0.028 0.150 0.860 0.560

M³ Kg Lbr Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.200 0.600 0.060 0.010

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00 65,000.00 45,000.00

196,000.00 3,675.00 55,900.00 25,200.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

20,000.00 75,000.00 9,000.00 1,200.00 385,975.00 38,597.50

Biaya Untuk 1 M2

424,572.50

Pasang Dinding pemisah gypsum rangkap, rangka kayu kls. II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6" Gypsum 9 mm Lem kayu

0.028 0.150 0.860 0.560

M³ Kg Lbr Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.150 0.450 0.045 0.008

Hari / Org Hari / Org Hari / Org Hari / Org

7,000,000.00 24,500.00 76,000.00 45,000.00

196,000.00 3,675.00 65,360.00 25,200.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 56,250.00 6,750.00 960.00 369,195.00 36,919.50

Biaya Untuk 1 M2

406,114.50

Pasang Dinding lambrisering dari papan kayu kls. II Kayu Kelas II (Kayu Cempaka, dll.) Paku Kayu 2" s/d 6" Paku sekrup

Harga Satuan Dinas PU Manado 2016

0.007 0.100 0.150

M³ Kg Kg

7,000,000.00 24,500.00 60,000.00

49,000.00 2,450.00 9,000.00

Halaman 172 dari 266 halaman

NO

URAIAN PEKERJAAN

Pekerja Tukang kayu Kepala Tukang Mandor

59

1 m¹

VI. 1

KOEFISIEN

0.600 1.800 0.180 0.030

SATUAN

Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

60,000.00 225,000.00 27,000.00 3,600.00 376,050.00 37,605.00

Biaya Untuk 1 M2

413,655.00

Pasang list plafond kayu profil 3/8 Kayu Profil 3/8

1.050

Ujg

17,500.00

18,375.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.021 0.021 0.002 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

2,100.00 2,625.00 300.00 120.00 23,520.00 2,352.00

Biaya Untuk 1 M2

25,872.00

PEKERJAAN BETON 1 m³

Beton mutu f'c = 7,4 Mpa (K 100), slump (12 +/ 2) cm, w/c 0,87 Semen PC Pasir Pasang / Beton Kerikil Beton Air Pekerja Tukang batu Kepala Tukang Mandor

247.000 0.621 0.740 215.000 1.650 0.250 0.025 0.080

Kg M³ M³ Ltr

1,269.98 260,700.00 326,015.00 150.00

313,683.83 161,820.21 241,251.10 32,250.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

165,000.00 31,250.00 3,750.00 9,600.00 958,605.14 95,860.51

Over Head, Keuntungan, Dll Biaya Untuk 1 M3

2

1 m³

1,054,465.65

Beton mutu f'c = 9,8 Mpa (K 125), slump (12 +/ 2) cm, w/c 0,78 Semen PC Pasir Pasang / Beton Kerikil Beton Air Pekerja Tukang batu Kepala Tukang Mandor Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2016

276.000 0.591 0.750 215.000 1.650 0.275 0.028 0.083

Kg M³ M³ Ltr

1,269.98 260,700.00 326,015.00 150.00

350,513.10 154,185.43 244,390.50 32,250.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

165,000.00 34,375.00 4,200.00 9,960.00 994,874.03 99,487.40

Halaman 173 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Biaya Untuk 1 M3

3

1 m³

Beton mutu f'c = 12,2 Mpa (K 150), slump (12 +/ 2) cm, w/c 0,72 Kg M³ M³ Ltr

1,269.98 260,700.00 326,015.00 150.00

379,722.53 148,785.21 245,597.97 32,250.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

165,000.00 34,375.00 4,200.00 9,960.00 1,019,890.71 101,989.07

Biaya Untuk 1 M3

1,121,879.78

Semen PC Pasir Pasang / Beton Kerikil Beton Air Pekerja Tukang batu Kepala Tukang Mandor

4

1 m³

1,269.98 260,700.00 326,015.00 150.00

292,094.25 166,289.36 248,012.89 30,000.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

120,000.00 25,000.00 3,000.00 7,200.00 891,596.50 89,159.65

Biaya Untuk 1 M3

980,756.15

1.200 0.200 0.020 0.060

Kg M³ M³ Ltr

1,269.98 260,700.00 326,015.00 150.00

414,011.85 141,522.86 248,495.88 32,250.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

165,000.00 34,375.00 4,200.00 9,960.00 1,049,815.58 104,981.56

Biaya Untuk 1 M3

1,154,797.14

Pekerja Tukang batu Kepala Tukang Mandor

1 m³

230.000 0.638 0.761 200.000

Beton mutu f'c = 14,5 Mpa (K 175), slump (12 +/ 2) cm, w/c 0,66 Semen PC Pasir Pasang / Beton Kerikil Beton Air

6

1.650 0.275 0.028 0.083

Kg M³ M³ Ltr

Pekerja Tukang batu Kepala Tukang Mandor

1 m³

299.000 0.571 0.753 215.000

Lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,87 Semen PC Pasir Pasang / Beton Kerikil Beton Air

5

1,094,361.44

326.000 0.543 0.762 215.000 1.650 0.275 0.028 0.083

Beton mutu f'c = 16,9 Mpa (K 200), slump (12 +/ 2) cm, w/c 0,61r

Harga Satuan Dinas PU Manado 2016

Halaman 174 dari 266 halaman

NO

URAIAN PEKERJAAN

447,031.20 136,122.64 248,978.86 32,250.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

165,000.00 34,375.00 4,200.00 9,960.00 1,077,917.71 107,791.77

Biaya Untuk 1 M3

1,185,709.48

1,269.98 260,700.00 326,015.00 150.00

471,160.73 129,977.57 252,842.74 32,250.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

165,000.00 34,375.00 4,200.00 9,960.00 1,099,766.04 109,976.60

Biaya Untuk 1 M3

1,209,742.64

1.650 0.275 0.028 0.083

Kg M³ M³ Ltr

1,269.98 260,700.00 326,015.00 150.00

487,670.40 128,860.29 250,910.80 32,250.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

165,000.00 34,375.00 4,200.00 9,960.00 1,113,226.49 111,322.65

Biaya Untuk 1 M3

1,224,549.14

Pekerja Tukang batu Kepala Tukang Mandor

1 m³

371.000 0.499 0.776 215.000

Beton mutu f'c = 21,7 Mpa (K 250), slump (12 +/ 2) cm, w/c 0,56 Semen PC Pasir Pasang / Beton Kerikil Beton Air

9

1.650 0.275 0.028 0.083

Kg M³ M³ Ltr

Pekerja Tukang batu Kepala Tukang Mandor

1 m³

352.000 0.522 0.764 215.000

Beton mutu f'c = 19,3 Mpa (K 225), slump (12 +/ 2) cm, w/c 0,58 Semen PC Pasir Pasang / Beton Kerikil Beton Air

8

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 1,269.98 260,700.00 326,015.00 150.00

Pekerja Tukang batu Kepala Tukang Mandor

1 m³

SATUAN Kg M³ M³ Ltr

Semen PC Pasir Pasang / Beton Kerikil Beton Air

7

KOEFISIEN

384.000 0.494 0.770 215.000 1.650 0.275 0.028 0.083

Beton mutu f'c = 24 Mpa (K 275), slump (12 +/ 2) cm, w/c 0,53 Semen PC Pasir Pasang / Beton Kerikil Beton Air Pekerja Tukang batu

Harga Satuan Dinas PU Manado 2016

406.000 0.494 0.770 215.000 1.650 0.275

Kg M³ M³ Ltr

1,269.98 260,700.00 326,015.00 150.00

515,609.85 128,860.29 250,910.80 32,250.00

Hari / Org Hari / Org

100,000.00 125,000.00

165,000.00 34,375.00

Halaman 175 dari 266 halaman

NO

URAIAN PEKERJAAN Kepala Tukang Mandor

10

1 m³

Biaya Untuk 1 M3

1,255,282.53

Kg M³ M³ Ltr

1,269.98 260,700.00 326,015.00 150.00

524,499.68 126,811.93 246,563.94 32,250.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

165,000.00 34,375.00 4,200.00 9,960.00 1,143,660.54 114,366.05

Biaya Untuk 1 M3

1,258,026.59

413.000 0.486 0.756 215.000 1.650 0.275 0.028 0.083

Beton mutu f'c = 28,8 Mpa (K 325), slump (12 +/ 2) cm, w/c 0,49 Kg M³ M³ Ltr

1,269.98 260,700.00 326,015.00 150.00

557,519.03 124,763.57 242,941.55 32,250.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

210,000.00 43,750.00 5,250.00 12,600.00 1,229,074.14 122,907.41

Biaya Untuk 1 M3

1,351,981.56

Pekerja Tukang batu Kepala Tukang Mandor

1 m³

150,000.00 120,000.00

Beton mutu f'c = 26,4 Mpa (K 300), slump (12 +/ 2) cm, w/c 0,52

Semen PC Pasir Pasang / Beton Kerikil Beton Air

12

Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

Pekerja Tukang batu Kepala Tukang Mandor

1 m³

0.028 0.083

SATUAN

4,200.00 9,960.00 1,141,165.94 114,116.59

Semen PC Pasir Pasang / Beton Kerikil Beton Air

11

KOEFISIEN

439.000 0.479 0.745 215.000 2.100 0.350 0.035 0.105

Beton mutu f'c = 31,2 Mpa (K 350), slump (12 +/ 2) cm, w/c 0,48 Kg M³ M³ Ltr

1,269.98 260,700.00 326,015.00 150.00

568,948.80 124,204.93 241,492.59 32,250.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

210,000.00 43,750.00 5,250.00 12,600.00 1,238,496.32 123,849.63

Biaya Untuk 1 M3

1,362,345.95

Semen PC Pasir Pasang / Beton Kerikil Beton Air Pekerja Tukang batu Kepala Tukang Mandor

Harga Satuan Dinas PU Manado 2016

448.000 0.476 0.741 215.000 2.100 0.350 0.035 0.105

Halaman 176 dari 266 halaman

NO

13

URAIAN PEKERJAAN

1 m³

15

16

1 m²

1 m²

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Kg M³ M³ Kg

1,269.98 260,700.00 326,015.00 59,065.00

466,080.83 114,708.00 286,893.20 60,900.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

210,000.00 43,750.00 5,250.00 12,600.00 1,200,182.03 120,018.20

Biaya Untuk 1 M3

1,320,200.23

Pekerja Tukang batu Kepala Tukang Mandor

1 Kg

SATUAN

Beton kedap air dengan storox-100 Semen PC Pasir Pasang / Beton Kerikil Beton Storox-100

14

KOEFISIEN

367.000 0.440 0.880 1.200 2.100 0.350 0.035 0.105

Pembesian dengan besi polos atau besi ulir Besi Beton Polos Kawat Beton / Bendrat

1.050 0.015

Kg Kg

11,700.00 24,000.00

12,285.00 360.00

Pekerja Tukang batu Kepala tukang Mandor

0.007 0.007 0.001 0.000

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

700.00 875.00 105.00 48.00 14,373.00 1,437.30

Biaya Untuk 1 Kg

15,810.30

Memasang jaring kawat/wiremesh θ 6 Besi Warmesh θ 6 Kawat Beton / Bendrat

0.088 0.005

Unit Kg

375,000.00 24,000.00

33,000.00 120.00

Pekerja Tukang batu Kepala tukang Mandor

0.500 0.500 0.050 0.030

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

50,000.00 62,500.00 7,500.00 3,600.00 156,720.00 15,672.00

Biaya Untuk 1 Kg

172,392.00

Memasang jaring kawat/wiremesh θ 8 Besi Warmesh θ 8 Kawat Beton / Bendrat

0.088 0.005

Unit Kg

650,000.00 24,000.00

57,200.00 120.00

Pekerja Tukang batu Kepala tukang Mandor

0.500 0.500 0.050 0.030

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

50,000.00 62,500.00 7,500.00 3,600.00 180,920.00 18,092.00

Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2016

Halaman 177 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Biaya Untuk 1 Kg

17

18

19

20

1 m²

1 m²

1 m²

1 m²

199,012.00

Memasang jaring kawat/wiremesh θ 10 Besi Warmesh θ 10 Kawat Beton / Bendrat

0.088 0.005

Unit Kg

Pekerja Tukang batu Kepala tukang Mandor

0.500 0.500 0.050 0.030

Hari / Org Hari / Org Hari / Org Hari / Org

1,000,000.00 24,000.00

88,000.00 120.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

50,000.00 62,500.00 7,500.00 3,600.00 211,720.00 21,172.00

Biaya Untuk 1 Kg

232,892.00

Pasang bekisting untuk pondasi Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Minyak bekisting

0.040 0.300 0.100

M³ Kg Ltr

Pekerja Tukang batu Kepala tukang Mandor

0.520 0.260 0.026 0.026

Hari / Org Hari / Org Hari / Org Hari / Org

4,500,000.00 24,500.00 12,410.00

180,000.00 7,350.00 1,241.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

52,000.00 32,500.00 3,900.00 3,120.00 280,111.00 28,011.10

Biaya Untuk 1 M2

308,122.10

Pasang bekisting untuk sloof Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Minyak bekisting

0.045 0.300 0.100

M³ Kg Ltr

Pekerja Tukang batu Kepala tukang Mandor

0.520 0.260 0.026 0.026

Hari / Org Hari / Org Hari / Org Hari / Org

4,500,000.00 24,500.00 12,410.00

202,500.00 7,350.00 1,241.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

52,000.00 32,500.00 3,900.00 3,120.00 302,611.00 30,261.10

Biaya Untuk 1 M2

332,872.10

Pasang bekisting untuk kolom Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Minyak bekisting Kayu Kelas III (Kayu Nantu, dll.)

Harga Satuan Dinas PU Manado 2016

0.040 0.400 0.200 0.015

M³ Kg Ltr M³

4,500,000.00 24,500.00 12,410.00 4,500,000.00

180,000.00 9,800.00 2,482.00 67,500.00

Halaman 178 dari 266 halaman

NO

21

22

23

URAIAN PEKERJAAN

1 m²

1 m²

1 m²

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Multipleks 9 mm Bambu / Dolken

0.350 2.000

Lbr Btg

145,000.00 14,770.00

50,750.00 29,540.00

Pekerja Tukang batu Kepala tukang Mandor

0.660 0.330 0.033 0.033

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

66,000.00 41,250.00 4,950.00 3,960.00 456,232.00 45,623.20

Biaya Untuk 1 M2

501,855.20

Pasang bekisting untuk balok Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Minyak bekisting Kayu Kelas III (Kayu Nantu, dll.) Multipleks 9 mm Bambu / Dolken

0.040 0.400 0.200 0.018 0.350 2.000

M³ Kg Ltr M³ Lbr Btg

Pekerja Tukang batu Kepala tukang Mandor

0.660 0.330 0.033 0.033

Hari / Org Hari / Org Hari / Org Hari / Org

4,500,000.00 24,500.00 12,410.00 4,500,000.00 145,000.00 14,770.00

180,000.00 9,800.00 2,482.00 81,000.00 50,750.00 29,540.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

66,000.00 41,250.00 4,950.00 3,960.00 469,732.00 46,973.20

Biaya Untuk 1 M2

516,705.20

Pasang bekisting untuk lantai Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Minyak bekisting Kayu Kelas III (Kayu Nantu, dll.) Multipleks 9 mm Bambu / Dolken

0.040 0.400 0.200 0.015 0.350 6.000

M³ Kg Ltr M³ Lbr Btg

Pekerja Tukang batu Kepala tukang Mandor

0.660 0.330 0.033 0.033

Hari / Org Hari / Org Hari / Org Hari / Org

4,500,000.00 24,500.00 12,410.00 4,500,000.00 145,000.00 14,770.00

180,000.00 9,800.00 2,482.00 67,500.00 50,750.00 88,620.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

66,000.00 41,250.00 4,950.00 3,960.00 515,312.00 51,531.20

Biaya Untuk 1 M2

566,843.20

Pasang bekisting untuk tangga Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Minyak bekisting Kayu Kelas III (Kayu Nantu, dll.) Multipleks 9 mm

Harga Satuan Dinas PU Manado 2016

0.030 0.400 0.150 0.015 0.350

M³ Kg Ltr M³ Lbr

4,500,000.00 24,500.00 12,410.00 4,500,000.00 145,000.00

135,000.00 9,800.00 1,861.50 67,500.00 50,750.00

Halaman 179 dari 266 halaman

NO

24

25

URAIAN PEKERJAAN

1 m²

1 m³

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

2.000

Btg

14,770.00

29,540.00

Pekerja Tukang batu Kepala tukang Mandor

0.660 0.330 0.033 0.033

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

66,000.00 41,250.00 4,950.00 3,960.00 410,611.50 41,061.15

Biaya Untuk 1 M2

451,672.65

Jembatan untuk pengecoran beton Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Bambu / Dolken

0.026 0.600 0.500

M³ Kg Btg

Pekerja Tukang batu Kepala tukang Mandor

0.150 0.050 0.005 0.008

Hari / Org Hari / Org Hari / Org Hari / Org

4,500,000.00 24,500.00 14,770.00

118,800.00 14,700.00 7,385.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 6,250.00 750.00 960.00 163,845.00 16,384.50

Biaya Untuk 1 M2

180,229.50

Membuat pondasi beton bertulang (150 kg besi + bekisting) 0.200 1.500 0.400 157.500 2.250 336.000 0.540 0.810

M³ Kg Ltr Kg Kg Kg M³ M³

4,500,000.00 24,500.00 12,410.00 11,700.00 24,000.00 1,269.98 260,700.00 326,015.00

900,000.00 36,750.00 4,964.00 1,842,750.00 54,000.00 426,711.60 140,778.00 264,072.15

100,000.00 125,000.00 125,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

530,000.00 34,375.00 162,500.00 131,250.00 39,300.00 31,800.00 4,599,250.75 459,925.08

Biaya Untuk 1 M3

5,059,175.83

Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

1 m³

SATUAN

Bambu / Dolken

Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Minyak bekisting Besi beton polos Kawat Beton / Bendrat Semen PC Pasir Pasang / Beton Kerikil Beton

26

KOEFISIEN

5.300 0.275 1.300 1.050 0.262 0.265

Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org

Membuat sloof beton bertulang (200 kg besi + bekisting) Kayu Kelas III (Kayu Nantu, dll.)

Harga Satuan Dinas PU Manado 2016

0.270



4,500,000.00

1,215,000.00

Halaman 180 dari 266 halaman

NO

URAIAN PEKERJAAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 24,500.00 12,410.00 11,700.00 24,000.00 1,269.98 260,700.00 326,015.00

49,000.00 7,446.00 2,457,000.00 72,000.00 426,711.60 140,778.00 264,072.15

Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 125,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

565,000.00 34,375.00 195,000.00 175,000.00 48,450.00 33,960.00 5,683,792.75 568,379.28

Biaya Untuk 1 M3

6,252,172.03

Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

1 m³

SATUAN Kg Ltr Kg Kg Kg M³ M³

Paku Kayu 2" s/d 6" Minyak bekisting Besi beton polos Kawat Beton / Bendrat Semen PC Pasir Pasang / Beton Kerikil Beton

27

KOEFISIEN 2.000 0.600 210.000 3.000 336.000 0.540 0.810

5.650 0.275 1.560 1.400 0.323 0.283

Membuat kolom beton bertulang (300 kg besi + bekisting) Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Minyak bekisting Besi beton polos Kawat Beton / Bendrat Semen PC Pasir Pasang / Beton Kerikil Beton Kayu Kelas III (Kayu Nantu, dll.) Multipleks 9 mm Bambu / Dolken

Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

0.400 4.000 2.000 315.000 4.500 336.000 0.540 0.810 0.150 3.500 20.000

7.050 0.275 1.650 2.100 0.403 0.353

M³ Kg Ltr Kg Kg Kg M³ M³ M³ Lbr Btg

Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org

4,500,000.00 24,500.00 12,410.00 11,700.00 24,000.00 1,269.98 260,700.00 326,015.00 4,500,000.00 145,000.00 14,770.00

1,800,000.00 98,000.00 24,820.00 3,685,500.00 108,000.00 426,711.60 140,778.00 264,072.15 675,000.00 507,500.00 295,400.00

100,000.00 125,000.00 125,000.00 125,000.00 150,000.00 120,000.00

705,000.00 34,375.00 206,250.00 262,500.00 60,450.00 42,360.00 9,336,716.75 933,671.68

Over Head, Keuntungan, Dll Biaya Untuk 1 M3

28

1 m³

10,270,388.43

Membuat balok beton bertulang (200 kg besi + bekisting) Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Minyak bekisting Besi beton polos Kawat Beton / Bendrat Semen PC Pasir Pasang / Beton Kerikil Beton Kayu Kelas III (Kayu Nantu, dll.)

Harga Satuan Dinas PU Manado 2016

0.320 3.200 1.600 210.000 3.000 336.000 0.540 0.810 0.140

M³ Kg Ltr Kg Kg Kg M³ M³ M³

4,500,000.00 24,500.00 12,410.00 11,700.00 24,000.00 1,269.98 260,700.00 326,015.00 4,500,000.00

1,440,000.00 78,400.00 19,856.00 2,457,000.00 72,000.00 426,711.60 140,778.00 264,072.15 630,000.00

Halaman 181 dari 266 halaman

NO

URAIAN PEKERJAAN

406,000.00 236,320.00

Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 125,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

635,000.00 34,375.00 206,250.00 175,000.00 49,950.00 38,160.00 7,309,872.75 730,987.28

Biaya Untuk 1 M3

8,040,860.03

6.350 0.275 1.650 1.400 0.333 0.318

0.275 1.650 2.100 157.500 2.250 336.000 0.540 0.810 0.150 3.500 20.000

M³ Kg Ltr Kg Kg Kg M³ M³ M³ Lbr Btg

4,500,000.00 24,500.00 12,410.00 11,700.00 24,000.00 1,269.98 260,700.00 326,015.00 4,500,000.00 145,000.00 14,770.00

1,237,500.00 40,425.00 26,061.00 1,842,750.00 54,000.00 426,711.60 140,778.00 264,072.15 675,000.00 507,500.00 295,400.00

100,000.00 125,000.00 125,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

530,000.00 34,375.00 162,500.00 131,250.00 39,750.00 31,800.00 6,439,872.75 643,987.28

Biaya Untuk 1 M3

7,083,860.03

Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

1 m³

2.800 16.000

Membuat Kolom beton bertulang (150 kg besi+bekisting) Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Minyak bekisting Besi beton polos Kawat Beton / Bendrat Semen PC Pasir Pasang / Beton Kerikil Beton Kayu Kelas III (Kayu Nantu, dll.) Multipleks 9 mm Bambu / Dolken

30

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 145,000.00 14,770.00

Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

1 m³

SATUAN Lbr Btg

Multipleks 9 mm Bambu / Dolken

29

KOEFISIEN

5.300 0.275 1.300 1.050 0.265 0.265

Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org

Membuat dinding beton bertulang (150 kg besi + bekisting) Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Minyak bekisting Besi beton polos Kawat Beton / Bendrat Semen PC Pasir Pasang / Beton Kerikil Beton Kayu Kelas III (Kayu Nantu, dll.) Multipleks 9 mm Bambu / Dolken

Pekerja

Harga Satuan Dinas PU Manado 2016

0.240 1.650 1.400 157.500 2.250 336.000 0.540 0.810 0.160 2.800 24.000

5.300

M³ Kg Ltr Kg Kg Kg M³ M³ M³ Lbr Btg

Hari / Org

4,500,000.00 24,500.00 12,410.00 11,700.00 24,000.00 1,269.98 260,700.00 326,015.00 4,500,000.00 145,000.00 14,770.00

1,080,000.00 40,425.00 17,374.00 1,842,750.00 54,000.00 426,711.60 140,778.00 264,072.15 720,000.00 406,000.00 354,480.00

100,000.00

530,000.00

Halaman 182 dari 266 halaman

NO

URAIAN PEKERJAAN Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

31

1 m³

Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll Biaya Untuk 1 M3

6,903,892.33

125,000.00 125,000.00 125,000.00 150,000.00 120,000.00

Membuat tangga beton bertulang (200 kg besi + bekisting) 0.250 3.000 1.200 210.000 3.000 336.000 0.540 0.810 0.105 2.500 14.000

M³ Kg Ltr Kg Kg Kg M³ M³ M³ Lbr Btg

4,500,000.00 24,500.00 12,410.00 11,700.00 24,000.00 1,269.98 260,700.00 326,015.00 4,500,000.00 145,000.00 14,770.00

1,125,000.00 73,500.00 14,892.00 2,457,000.00 72,000.00 426,711.60 140,778.00 264,072.15 472,500.00 362,500.00 206,780.00

100,000.00 125,000.00 125,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

565,000.00 34,375.00 195,000.00 175,000.00 48,450.00 33,960.00 6,667,518.75 666,751.88

Biaya Untuk 1 M3

7,334,270.63

Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

1 m¹

0.275 1.300 1.050 0.265 0.265

SATUAN

34,375.00 162,500.00 131,250.00 39,750.00 31,800.00 6,276,265.75 627,626.58

Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Minyak bekisting Besi beton polos Kawat Beton / Bendrat Semen PC Pasir Pasang / Beton Kerikil Beton Kayu Kelas III (Kayu Nantu, dll.) Multipleks 9 mm Bambu / Dolken

32

KOEFISIEN

5.650 0.275 1.560 1.400 0.323 0.283

Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org

Membuat Kolom praktis beton bertulang (11x11) cm Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Besi beton polos Kawat Beton / Bendrat Semen PC Pasir Pasang / Beton Kerikil Beton

0.002 0.010 3.000 0.045 4.000 0.006 0.009

M³ Kg Kg Kg Kg M³ M³

Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

0.180 0.020 0.020 0.020 0.006 0.009

Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org

4,500,000.00 24,500.00 11,700.00 24,000.00 1,269.98 260,700.00 326,015.00

9,000.00 245.00 35,100.00 1,080.00 5,079.90 1,564.20 2,934.14

100,000.00 125,000.00 125,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

18,000.00 2,500.00 2,500.00 2,500.00 900.00 1,080.00 82,483.24 8,248.32

Biaya Untuk 1 M'

90,731.56

Harga Satuan Dinas PU Manado 2016

Halaman 183 dari 266 halaman

NO

33

URAIAN PEKERJAAN

1 m¹

VII.

1

Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Besi beton polos Kawat Beton / Bendrat Semen PC Pasir Pasang / Beton Kerikil Beton

0.003 0.020 3.600 0.050 5.500 0.009 0.015

M³ Kg Kg Kg Kg M³ M³

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

0.297 0.033 0.033 0.033 0.010 0.015

Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org Hari / Org

4,500,000.00 24,500.00 11,700.00 24,000.00 1,269.98 260,700.00 326,015.00

13,500.00 490.00 42,120.00 1,200.00 6,984.86 2,346.30 4,890.23

100,000.00 125,000.00 125,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

29,700.00 4,125.00 4,125.00 4,125.00 1,500.00 1,800.00 116,906.39 11,690.64

Biaya Untuk 1 M'

128,597.03

PENUTUP ATAP

1 m²

Pasang atap genteng kodok/glazzur Bh

41,345.00

1,033,625.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 9,375.00 1,200.00 960.00 1,060,160.00 106,016.00

Biaya Untuk 1 M2

1,166,176.00

Pekerja Tukang kayu Kepala Tukang Mandor

3

SATUAN

Membuat ring balok beton bertulang (10 x 15) cm

Genteng (setara Genteng Kodok)

2

KOEFISIEN

1 m²

1 m²

25.000

0.150 0.075 0.008 0.008

Pasang atap asbes gelombang Besar Asbes Gelombang Besar Paku pancing

0.500 0.120

Lbr Kg

38,300.00 35,000.00

19,150.00 4,200.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.140 0.075 0.008 0.008

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

14,000.00 9,375.00 1,200.00 960.00 48,885.00 4,888.50

Biaya Untuk 1 M2

53,773.50

Pasang atap asbes gelombang Kecil

Harga Satuan Dinas PU Manado 2016

Halaman 184 dari 266 halaman

NO

4

URAIAN PEKERJAAN

1 m²

6

1 m²

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

0.600 0.120

Lbr Kg

31,310.00 35,000.00

18,786.00 4,200.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.140 0.075 0.008 0.008

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

14,000.00 9,375.00 1,200.00 960.00 48,521.00 4,852.10

Biaya Untuk 1 M2

53,373.10

Pasang atap genteng beton Lbr Kg

34,650.00 24,500.00

381,150.00 735.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

20,000.00 12,500.00 1,500.00 1,200.00 417,085.00 41,708.50

Biaya Untuk 1 M2

458,793.50

Pekerja Tukang kayu Kepala Tukang Mandor

1 m²

SATUAN

Asbes Gelombang Kecil Paku pancing

Genteng beton Paku Kayu 2" s/d 6"

5

KOEFISIEN

11.000 0.030

0.200 0.100 0.010 0.010

Pasang atap genteng metal (setara multiroof) Atap Genteng Metal (setara Multi Roof) Paku Genteng Metal

2.083 0.200

M² Kg

98,000.00 35,000.00

204,163.40 7,000.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.200 0.100 0.010 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

20,000.00 12,500.00 1,500.00 120.00 245,283.40 24,528.34

Biaya Untuk 1 M2

269,811.74

Pasang atap sirap Bh Kg

5,905.00 24,500.00

354,300.00 4,900.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

16,600.00 31,250.00 3,750.00 960.00 411,760.00 41,176.00

Biaya Untuk 1 M2

452,936.00

Genteng sirap Paku Kayu 2" s/d 6"

Pekerja Tukang kayu Kepala Tukang Mandor

Harga Satuan Dinas PU Manado 2016

60.000 0.200

0.166 0.250 0.025 0.008

Halaman 185 dari 266 halaman

NO

7

URAIAN PEKERJAAN

1 m¹

9

10

1 m¹

1 m²

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Bh Kg Kg M³ Kg

32,500.00 24,500.00 13,860.00 260,700.00 13,860.00

113,750.00 1,225.00 149,688.00 8,342.40 13,860.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

40,000.00 25,000.00 3,000.00 2,400.00 357,265.40 35,726.54

Biaya Untuk 1 M'

392,991.94

Pekerja Tukang kayu Kepala Tukang Mandor

1 m¹

SATUAN

Pasang nok genteng beton Nok genteng beton Paku Kayu 2" s/d 6" Semen warna Pasir Pasang / Beton Semen warna

8

KOEFISIEN

3.500 0.050 10.800 0.032 1.000

0.400 0.200 0.020 0.020

Pasang atap genteng aspal Genteng aspal Paku Kayu 2" s/d 6" Kayu Kelas III (Kayu Nantu, dll.)

2.000 0.050 0.004

Lbr Kg M³

Pekerja Tukang kayu Kepala Tukang Mandor

0.125 0.250 0.025 0.006

Hari / Org Hari / Org Hari / Org Hari / Org

82,690.00 24,500.00 4,500,000.00

165,380.00 1,225.00 15,750.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

12,500.00 31,250.00 3,750.00 720.00 230,575.00 23,057.50

Biaya Untuk 1 M' pasang atap genteng aspal

253,632.50

Pasang nok sirap Genteng sirap Paku Kayu 2" s/d 6" Paku Tripleks Kayu Kelas III (Kayu Nantu, dll.)

0.400 0.060 0.050 0.004

Bh Kg Kg M³

Pekerja Tukang kayu Kepala Tukang Mandor

0.125 0.250 0.025 0.006

Hari / Org Hari / Org Hari / Org Hari / Org

5,905.00 24,500.00 25,000.00 4,500,000.00

2,362.00 1,470.00 1,250.00 18,000.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

12,500.00 31,250.00 3,750.00 720.00 67,470.00 6,747.00

Biaya Untuk 1 M'

74,217.00

Pasang atap seng gelombang Seng Gelombang BJLS 24 Paku Seng

Harga Satuan Dinas PU Manado 2016

0.700 0.020

Lbr Kg

37,000.00 35,000.00

25,900.00 700.00

Halaman 186 dari 266 halaman

NO

URAIAN PEKERJAAN

Pekerja Tukang kayu Kepala Tukang Mandor

11

12

1 m²

1 m²

VIII.

1

KOEFISIEN

0.120 0.060 0.006 0.006

SATUAN

Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

12,000.00 7,500.00 900.00 720.00 47,720.00 4,772.00

Biaya Untuk 1 M2

52,492.00

Pasang atap nok seng Seng Plat BJLS 25 Paku Seng

0.300 0.040

Lbr Kg

65,500.00 35,000.00

19,650.00 1,400.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.150 0.070 0.008 0.006

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 8,750.00 1,200.00 720.00 46,720.00 4,672.00

Biaya Untuk 1 M2

51,392.00

Pasang alumunium foil/sisalation Alumunium foil

1.050



145,000.00

152,250.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.150 0.050 0.005 0.008

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 6,250.00 750.00 960.00 175,210.00 17,521.00

Biaya Untuk 1 M2

192,731.00

PEKERJAAN LANGIT - LANGIT

1 m²

Langit-langit plywood (30 x 60) cm, tebal 4 mm Plywood 4 mm Paku Kayu 2" s/d 6"

0.360 0.030

Lbr Kg

65,000.00 24,500.00

23,400.00 735.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.070 0.100 0.010 0.004

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

7,000.00 12,500.00 1,500.00 420.00 45,555.00 4,555.50

Biaya Untuk 1 M2

50,110.50

Harga Satuan Dinas PU Manado 2016

Halaman 187 dari 266 halaman

NO 2

3

4

5

URAIAN PEKERJAAN 1 m²

1 m²

1 m²

1 m²

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Langit-langit plywood (30 x 60) cm, tebal 6 mm Plywood 6 mm Paku Kayu 2" s/d 6"

0.360 0.030

Lbr Kg

78,000.00 24,500.00

28,080.00 735.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.070 0.100 0.010 0.004

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

7,000.00 12,500.00 1,500.00 420.00 50,235.00 5,023.50

Biaya Untuk 1 M2

55,258.50

Langit-langit plywood (60 x 120) cm, tebal 4 mm Plywood 4 mm Paku Kayu 2" s/d 6"

0.375 0.030

Lbr Kg

65,000.00 24,500.00

24,375.00 735.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.070 0.100 0.010 0.004

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

7,000.00 12,500.00 1,500.00 420.00 46,530.00 4,653.00

Biaya Untuk 1 M2

51,183.00

Langit-langit plywood (60 x 120) cm, tebal 6 mm Plywood 6 mm Paku Kayu 2" s/d 6"

0.375 0.030

Lbr Kg

78,000.00 24,500.00

29,250.00 735.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.070 0.100 0.010 0.004

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

7,000.00 12,500.00 1,500.00 420.00 51,405.00 5,140.50

Biaya Untuk 1 M2

56,545.50

Langit-langit teakwood (30 x 60) cm, tebal 4 mm Plywood 4 mm Paku Kayu 2" s/d 6"

0.360 0.030

Lbr Kg

65,000.00 24,500.00

23,400.00 735.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.070 0.100 0.010 0.004

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

7,000.00 12,500.00 1,500.00 420.00 45,555.00 4,555.50

Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2016

Halaman 188 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Biaya Untuk 1 M2 6

7

8

1 m²

1 m²

1 m²

50,110.50

Langit-langit teakwood (60 x 120) cm, tebal 4 mm Plywood 4 mm Paku Kayu 2" s/d 6"

0.375 0.030

Lbr Kg

65,000.00 24,500.00

24,375.00 735.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.070 0.100 0.010 0.004

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

7,000.00 12,500.00 1,500.00 420.00 46,530.00 4,653.00

Biaya Untuk 1 M2

51,183.00

Langit-langit lat kayu jati Kayu Kelas I (Kayu Linggua,dll.) Paku Kayu 2" s/d 6" Paku sekrup

0.024 0.010 0.050

M³ Kg Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.200 0.600 0.060 0.010

Hari / Org Hari / Org Hari / Org Hari / Org

11,000,000.00 24,500.00 60,000.00

264,000.00 245.00 3,000.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

20,000.00 75,000.00 9,000.00 1,200.00 372,445.00 37,244.50

Biaya Untuk 1 M2

409,689.50

Langit-langit softboard Softboard Paku Kayu 2" s/d 6"

0.350 0.030

Lbr Kg

70,875.00 24,500.00

24,806.25 735.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.600 0.100 0.010 0.003

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

60,000.00 12,500.00 1,500.00 360.00 99,901.25 9,990.13

Over Head, Keuntungan, Dll Biaya Untuk 1 M2

9

1 m¹

109,891.38

List langit-langit kayu profil Kayu Profil 3/3 Paku Kayu 2" s/d 6"

1.100 0.010

Ujg Kg

15,000.00 24,500.00

16,500.00 245.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.050 0.050 0.005 0.003

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

5,000.00 6,250.00 750.00 360.00

Harga Satuan Dinas PU Manado 2016

Halaman 189 dari 266 halaman

NO

10

URAIAN PEKERJAAN

1 m²

IX. 1

2

3

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

29,105.00 2,910.50

Biaya Untuk 1 M'

32,015.50

Langit-langit asbes (1,00 x 1,00) m, tebal 3,2 mm rangka kayu kelas III Kayu Kelas III (Kayu Nantu, dll.) Paku Kayu 2" s/d 6" Eternit (Asbes)

0.012 0.060 1.100

M³ Kg M²

Pekerja Tukang kayu Kepala Tukang Mandor

0.180 0.320 0.032 0.009

Hari / Org Hari / Org Hari / Org Hari / Org

4,500,000.00 24,500.00 37,500.00

54,000.00 1,470.00 41,250.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

18,000.00 40,000.00 4,800.00 1,080.00 106,600.00 10,660.00

Biaya Untuk 1 M2

117,260.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI 1 Bh

1 Bh

1 Bh

Memasang kloset duduk/monoblok Kloset Monoblok Lokal Perlengkapan

1.000 0.060

Bh Ls

Pekerja Tukang batu Kepala Tukang Mandor

3.300 1.100 0.001 0.160

Hari / Org Hari / Org Hari / Org Hari / Org

1,250,000.00 200.00

1,250,000.00 200.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

330,000.00 137,500.00 150.00 19,200.00 1,737,050.00 173,705.00

Biaya Untuk 1 Buah kloset

1,910,755.00

Memasang kloset jongkok porselen Kloset Jongkok Keramik Standar Semen PC Pasir Pasang / Beton

1.000 6.000 0.010

Bh Kg M³

305,000.00 1,269.98 260,700.00

305,000.00 7,619.85 2,607.00

Pekerja Tukang batu Kepala Tukang Mandor

1.000 1.500 1.500 0.160

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

100,000.00 187,500.00 225,000.00 19,200.00 541,926.85 54,192.69

Biaya Untuk 1 Buah kloset

596,119.54

Memasang urinoir

Harga Satuan Dinas PU Manado 2016

Halaman 190 dari 266 halaman

NO

4

5

6

URAIAN PEKERJAAN

1 Bh

1 Bh

1 Bh

KOEFISIEN

SATUAN

Urinoir Keramik Standar Perlengkapan Semen PC Pasir Pasang / Beton

1.000 0.300 6.000 0.010

Bh Ls Kg M³

Pekerja Tukang batu Kepala Tukang Mandor

1.000 1.000 0.100 0.100

Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 1,583,505.00 200.00 1,269.98 260,700.00

1,583,505.00 200.00 7,619.85 2,607.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

100,000.00 125,000.00 15,000.00 12,000.00 1,845,931.85 184,593.19

Biaya Untuk 1 Buah Urinoir

2,030,525.04

Memasang wastafel Wastafel Gantung Keramik Perlengkapan Semen warna Pasir Pasang / Beton

1.000 0.120 6.000 0.010

Bh Ls Kg M³

638,110.00 200.00 13,860.00 260,700.00

638,110.00 200.00 83,160.00 2,607.00

Pekerja Tukang batu Kepala Tukang Mandor

1.200 1.450 0.150 0.100

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

120,000.00 181,250.00 22,500.00 12,000.00 1,059,827.00 105,982.70

Biaya Untuk 1 Buah Wastafel

1,165,809.70

Memasang bak mandi Fibreglass volume 0,30 M3 Bak Mandi Fiberglass Perlengkapan

1.000 0.180

Bh Ls

577,500.00 200.00

577,500.00 200.00

Pekerja Tukang batu Kepala Tukang Mandor

1.800 2.700 0.540 0.110

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

180,000.00 337,500.00 81,000.00 13,200.00 1,189,400.00 118,940.00

Biaya Untuk 1 buah bak mandi

1,308,340.00

Memasang bak mandi batu bata volume 0,30 M3 Bata merah Semen PC Pasir Pasang / Beton Tegel Keramik uk. 11x11 cm Semen Warna

Pekerja Tukang batu

Harga Satuan Dinas PU Manado 2016

0.400 120.000 0.300 360.000 6.000

6.000 3.000

Bh Kg M³ Bh Kg

850.00 1,269.98 260,700.00 1,305.00 13,860.00

340.00 152,397.00 78,210.00 469,800.00 83,160.00

Hari / Org Hari / Org

100,000.00 125,000.00

600,000.00 375,000.00

Halaman 191 dari 266 halaman

NO

URAIAN PEKERJAAN Kepala Tukang Mandor

7

8

1 Bh

1 Bh

Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll Biaya Untuk 1 buah bak mandi

2,023,897.70

150,000.00 120,000.00

Membuat bak fiberglass volume 1 M3 air Bak Mandi Fiberglass Perlengkapan

1.000 0.120

Bh Ls

577,500.00 200.00

577,500.00 200.00

Pekerja Tukang batu Kepala Tukang Mandor

3.000 4.500 0.900 0.900

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

300,000.00 562,500.00 135,000.00 108,000.00 1,683,200.00 168,320.00

Biaya Untuk 1 buah bak fibreglass

1,851,520.00

Memasang bak kontrol pasangan batu bata ukuran (30x30) cm, tinggi 35 cm Bh Kg M³ M³ Kg M³

850.00 1,269.98 260,700.00 326,015.00 11,700.00 260,700.00

123.25 55,878.90 18,249.00 22,821.05 18,720.00 15,642.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

320,000.00 126,875.00 225.00 1,920.00 580,454.20 58,045.42

Biaya Untuk 1 bak kontrol

638,499.62

Pekerja Tukang batu Kepala Tukang Mandor

1 Bh

0.300 0.300

SATUAN

45,000.00 36,000.00 1,839,907.00 183,990.70

Bata merah Semen PC Pasir Pasang / Beton Kerikil Beton Besi beton polos Pasir Pasang / Beton

9

KOEFISIEN

0.145 44.000 0.070 0.070 1.600 0.060

3.200 1.015 0.002 0.016

Memasang bak kontrol pasangan batu bata ukuran (45x45) cm, tinggi 50 cm Bata Merah Semen PC Pasir Pasang / Beton Kerikil Beton Besi beton polos Pasir Pasang / Beton

Pekerja Tukang batu Kepala Tukang Mandor

Harga Satuan Dinas PU Manado 2016

0.250 77.000 0.130 0.020 2.600 0.090

1.420 0.473 0.047 0.071

Bh Kg M³ M³ Kg M³

850.00 1,269.98 260,700.00 326,015.00 11,700.00 260,700.00

212.50 97,788.08 33,891.00 6,520.30 30,420.00 23,463.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

142,000.00 59,125.00 7,050.00 8,520.00 408,989.88

Halaman 192 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

40,898.99

Biaya Untuk 1 bak kontrol

10

11

12

13

1 M¹

1 M¹

1 M¹

1 M¹

449,888.86

Memasang pipa galvanis (Medium A), diameter 1/2" Pipa Galvanis (medium A) dia. 1/2" Perlengkapan

1.200 0.350

M¹ Ls

125,000.00 200.00

150,000.00 200.00

Pekerja Tukang batu Kepala Tukang Mandor

0.054 0.090 0.009 0.027

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

5,400.00 11,250.00 1,350.00 3,240.00 171,440.00 17,144.00

Biaya Untuk 1 m' pipa galvanis

188,584.00

Memasang pipa galvanis (Medium A), diameter 3/4" Pipa Galvanis (medium A) dia. 3/4" Perlengkapan

1.200 0.350

M¹ Ls

150,000.00 200.00

180,000.00 200.00

Pekerja Tukang batu Kepala Tukang Mandor

0.054 0.090 0.009 0.027

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

5,400.00 11,250.00 1,350.00 3,240.00 201,440.00 20,144.00

Biaya Untuk 1 m' pipa galvanis

221,584.00

Memasang pipa galvanis (Medium A), diameter 1" Pipa Galvanis (medium A) dia. 1" Perlengkapan

1.200 0.350

M¹ Ls

200,000.00 200.00

240,000.00 200.00

Pekerja Tukang batu Kepala Tukang Mandor

0.054 0.090 0.009 0.027

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

5,400.00 11,250.00 1,350.00 3,240.00 261,440.00 26,144.00

Biaya Untuk 1 m' pipa galvanis

287,584.00

Memasang pipa galvanis (Medium A), diameter 2" Pipa Galvanis (medium A) dia. 2" Perlengkapan

1.200 0.350

M¹ Ls

375,000.00 200.00

450,000.00 200.00

Pekerja Tukang batu

0.108 0.180

Hari / Org Hari / Org

100,000.00 125,000.00

10,800.00 22,500.00

Harga Satuan Dinas PU Manado 2016

Halaman 193 dari 266 halaman

NO

URAIAN PEKERJAAN Kepala Tukang Mandor

14

15

1 M¹

1 M¹

KOEFISIEN 0.018 0.005

SATUAN Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 150,000.00 120,000.00

Over Head, Keuntungan, Dll

2,700.00 648.00 486,848.00 48,684.80

Biaya Untuk 1 m' pipa galvanis

535,532.80

Memasang pipa galvanis (Medium A), diameter 3" Pipa Galvanis (medium A) dia. 3" Perlengkapan

1.200 0.350

M¹ Ls

625,000.00 200.00

750,000.00 200.00

Pekerja Tukang batu Kepala Tukang Mandor

0.108 0.180 0.018 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

10,800.00 22,500.00 2,700.00 648.00 786,848.00 78,684.80

Biaya Untuk 1 m' pipa galvanis

865,532.80

Memasang pipa PVC dia. 4" AW Pipa PVC dia. 4" AW Perlengkapan

1.200 0.350

M¹ Ls

67,250.00 200.00

80,700.00 200.00

Pekerja Tukang batu Kepala Tukang Mandor

0.036 0.060 0.006 0.002

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

3,600.00 7,500.00 900.00 216.00 93,116.00 9,311.60

Over Head, Keuntungan, Dll Biaya Untuk 1 m'

16

17

1 M¹

1 M¹

102,427.60

Memasang pipa PVC dia. 3" AW Pipa PVC dia. 3" AW Perlengkapan

1.200 0.350

M¹ Ls

41,750.00 200.00

50,100.00 200.00

Pekerja Tukang batu Kepala Tukang Mandor

0.036 0.060 0.006 0.002

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

3,600.00 7,500.00 900.00 216.00 62,516.00 6,251.60

Biaya Untuk 1 m'

68,767.60

Memasang pipa PVC dia.2" AW Pipa PVC dia. 2" AW Perlengkapan

Harga Satuan Dinas PU Manado 2016

1.200 0.350

M¹ Ls

21,250.00 200.00

25,500.00 200.00

Halaman 194 dari 266 halaman

NO

URAIAN PEKERJAAN

Pekerja Tukang batu Kepala Tukang Mandor

18

19

20

21

1 M¹

1 M¹

1 M¹

1 M¹

KOEFISIEN

0.036 0.060 0.006 0.002

SATUAN

Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

3,600.00 7,500.00 900.00 216.00 37,916.00 3,791.60

Biaya Untuk 1 m'

41,707.60

Memasang pipa PVC dia. 1.5" AW Pipa PVC dia. 1,5" AW Perlengkapan

1.200 0.350

M¹ Ls

17,500.00 200.00

21,000.00 200.00

Pekerja Tukang batu Kepala Tukang Mandor

0.036 0.060 0.006 0.002

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

3,600.00 7,500.00 900.00 216.00 33,416.00 3,341.60

Biaya Untuk 1 m'

36,757.60

Memasang pipa PVC dia. 1" AW Pipa PVC dia. 1" AW Perlengkapan

1.200 0.350

M¹ Ls

Pekerja Tukang batu Kepala Tukang Mandor

0.054 0.090 0.009 0.003

Hari / Org Hari / Org Hari / Org Hari / Org

9,625.00 200.00

11,550.00 200.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

5,400.00 11,250.00 1,350.00 324.00 30,074.00 3,007.40

Biaya Untuk 1 m'

33,081.40

Memasang pipa PVC dia. 3/4" AW Pipa PVC (S-12,5) dia. 3/4" AW Perlengkapan

1.200 0.350

M¹ Ls

Pekerja Tukang batu Kepala Tukang Mandor

0.036 0.060 0.006 0.002

Hari / Org Hari / Org Hari / Org Hari / Org

6,950.00 200.00

8,340.00 200.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

3,600.00 7,500.00 900.00 216.00 20,756.00 2,075.60

Biaya Untuk 1 m'

22,831.60

Memasang pipa PVC Dia. 1/2" AW Pipa PVC (S-12,5) dia. 1/2" AW

Harga Satuan Dinas PU Manado 2016

1.200



5,387.50

6,465.00

Halaman 195 dari 266 halaman

NO

22

23

URAIAN PEKERJAAN

1 Bh

1 Bh

X.

1

KOEFISIEN

SATUAN

Perlengkapan

0.350

Ls

Pekerja Tukang batu Kepala Tukang Mandor

0.036 0.060 0.006 0.002

Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 200.00

200.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

3,600.00 7,500.00 900.00 216.00 18,881.00 1,888.10

Biaya Untuk 1 m'

20,769.10

Memasang kran diameter 3/4" atau 1/2" Stop Kran 1/2" Paper Tape

1.000 0.000

Bh M¹

141,000.00 7,500.00

141,000.00 1.88

Pekerja Tukang batu Kepala Tukang Mandor

0.010 0.100 0.010 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

1,000.00 12,500.00 1,500.00 600.00 156,601.88 15,660.19

Biaya Untuk 1 bh kran

172,262.06

Memasang floor drain Floor drain

1.000

Bh

40,000.00

40,000.00

Pekerja Tukang batu Kepala Tukang Mandor

0.010 0.100 0.010 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

1,000.00 12,500.00 1,500.00 600.00 55,600.00 5,560.00

Biaya Untuk 1 floor drain

61,160.00

BESI DAN ALUMUNIUM

1 Kg

Besi profil

Kg

108,000.00

Besi profil

1.150

Kg

108,000.00

124,200.00

Pekerja Tukang las Kepala tukang Mandor

0.060 0.060 0.006 0.000

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

6,000.00 7,500.00 900.00 36.00

Harga Satuan Dinas PU Manado 2016

Halaman 196 dari 266 halaman

NO

2

3

URAIAN PEKERJAAN

1 Kg

100 Kg

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

138,636.00 13,863.60

Biaya Untuk 1 Kg Besi profil

152,499.60

Pasang rangka kuda-kuda baja IWF Besi Profil

1.150

Kg

108,000.00

124,200.00

Pekerja Tukang las Kepala tukang Mandor

0.060 0.060 0.006 0.000

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

6,000.00 7,500.00 900.00 36.00 138,636.00 13,863.60

Biaya Untuk 1 Kg pasang rangka atap baja

152,499.60

Pekerjaan perakitan S o l a r (HET) Minyak Pelumas / Oli (Pertamina)

1.000 0.100

Ltr Ltr

6,600.00 35,000.00

6,600.00 3,500.00

Pekerja Tukang las Kepala tukang Mandor Sewa alat Over Head, Keuntungan, Dll

0.100 0.100 0.001 0.005 0.800

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

10,000.00 12,500.00 150.00 600.00 33,350.00 3,335.00

Biaya Untuk 100 Kg Pekerjaan perakitan

4

1 m²

Pintu besi plat baja tebal 2mm rangkap, rangka baja siku 15.000 32.800 0.050

M¹ Kg Kg

95,000.00 92,400.00 29,530.00

1,425,000.00 3,030,720.00 1,476.50

1.050 1.050 0.105 0.052

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

105,000.00 131,250.00 15,750.00 6,240.00 4,715,436.50 471,543.65

Biaya Untuk 1 m2 pasang pintu besi baja

5,186,980.15

Besi Siku 3 x 3 x 3 Besi strip Kawat las

Pekerja Tukang las Kepala tukang Mandor

5

36,685.00

100 cm Pengelasan dengan las listrik Kawat Las S o l a r (HET) Minyak Pelumas / Oli (Pertamina)

0.400 0.300 0.040

Kg Ltr Ltr

29,530.00 6,600.00 35,000.00

11,812.00 1,980.00 1,400.00

Pekerja Tukang las Kepala tukang Mandor

0.040 0.020 0.002 0.002

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

4,000.00 2,500.00 300.00 240.00

Harga Satuan Dinas PU Manado 2016

Halaman 197 dari 266 halaman

NO

URAIAN PEKERJAAN Sewa alat Over Head, Keuntungan, Dll

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

0.170

22,232.00 2,223.20

Biaya Untuk 100 cm Pengelasan dengan las listrik

6

7

8

9

1 m²

1 m²

1 m²

1 m²

24,455.20

Pasang jendela besi Jendela besi

1.000



885,940.00

885,940.00

Tukang Las Pekerja Kepala Tukang Mandor

1.050 1.050 0.105 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

125,000.00 100,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

131,250.00 105,000.00 15,750.00 630.00 1,138,570.00 113,857.00

Biaya Untuk 1 m2 pasang jendela besi

1,252,427.00

Pasang jendela besi tahan api Jendela besi tahan api

1.000



Tukang Las Pekerja Kepala Tukang Mandor

1.200 1.022 0.120 0.006

Hari / Org Hari / Org Hari / Org Hari / Org

1,063,125.00

1,063,125.00

125,000.00 100,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

150,000.00 102,200.00 18,000.00 720.00 1,334,045.00 133,404.50

Biaya Untuk 1 m2 pasang jendela besi tahan api

1,467,449.50

Pasang pintu gulung besi Pintu gulung besi

1.000



885,940.00

885,940.00

Tukang Las Pekerja Kepala Tukang Mandor

1.200 1.200 0.120 0.006

Hari / Org Hari / Org Hari / Org Hari / Org

125,000.00 100,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

150,000.00 120,000.00 18,000.00 720.00 1,174,660.00 117,466.00

Biaya Untuk 1 m2 pasang pintu gulung besi

1,292,126.00

Pasang pintu lipat Pintu lipat

1.000



885,940.00

885,940.00

Tukang Las Pekerja Kepala Tukang Mandor

1.050 1.050 0.105 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

125,000.00 100,000.00 150,000.00 120,000.00

131,250.00 105,000.00 15,750.00 624.00 1,138,564.00

Harga Satuan Dinas PU Manado 2016

Halaman 198 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

113,856.40

Biaya Untuk 1 m2 pasang pintu lipat

10

11

12

13

1 m²

1 m²

1 m²

1 m²

1,252,420.40

Pasang pintu Sunscreen alumunium Sunscreen alumunium

1.000



147,655.00

147,655.00

Tukang Las Pekerja Kepala Tukang Mandor

0.800 0.080 0.080 0.004

Hari / Org Hari / Org Hari / Org Hari / Org

125,000.00 100,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

100,000.00 8,000.00 12,000.00 480.00 268,135.00 26,813.50

Biaya Untuk 1 m2 pasang pintu sunscreen alumunium

294,948.50

Pasang Rolling door Rolling Door

1.000



Pekerja Tukang las Kepala tukang Mandor

1.200 1.200 0.120 0.006

Hari / Org Hari / Org Hari / Org Hari / Org

2,021,250.00

2,021,250.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

120,000.00 150,000.00 18,000.00 720.00 2,309,970.00 230,997.00

Biaya Untuk 1 m2 pasang Rolling Door

2,540,967.00

Pasang pintu alumunium Pintu alumunium

1.000



856,550.00

856,550.00

Tukang Las Pekerja Kepala Tukang Mandor

1.050 1.050 0.105 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

125,000.00 100,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

131,250.00 105,000.00 15,750.00 624.00 1,109,174.00 110,917.40

Biaya Untuk 1 m2 pasang pintu alumunium

1,220,091.40

Pasang venetions blinds Venetion blinds

1.000



70,875.00

70,875.00

Tukang kayu Pekerja Kepala Tukang Mandor

0.350 0.350 0.035 0.002

Hari / Org Hari / Org Hari / Org Hari / Org

125,000.00 100,000.00 150,000.00 120,000.00

43,750.00 35,000.00 5,250.00 210.00 155,085.00 15,508.50

Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2016

Halaman 199 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Biaya Untuk 1 m2 pasang venetions blinds

14

15

1 m²

1 m²

Pasang Venetion blinds Venetion blinds

1.000



70,875.00

70,875.00

Tukang kayu Pekerja Kepala Tukang Mandor

0.350 0.350 0.035 0.002

Hari / Org Hari / Org Hari / Org Hari / Org

125,000.00 100,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

43,750.00 35,000.00 5,250.00 210.00 155,085.00 15,508.50

Biaya Untuk 1 m2 pasang vertikals blinds

170,593.50

Pasang trali besi Kg

92,400.00

1,062,600.00

Hari / Org Hari / Org Hari / Org Hari / Org

125,000.00 100,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

150,000.00 120,000.00 1,800.00 72.00 1,334,472.00 133,447.20

Biaya Untuk 1 m2 pasang trali besi

1,467,919.20

Besi strip

Tukang las Pekerja Kepala Tukang Mandor

16

17

1 m²

1 m²

170,593.50

11.500

1.200 1.200 0.012 0.001

Pasang kawat harmonika Kawat harmonika Paku Tripleks Kayu Kelas III (Kayu Nantu, dll.)

1.100 0.020 0.002

M² Kg M³

Pekerja Tukang kayu Kepala Tukang Mandor

0.100 0.100 0.010 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

36,910.00 25,000.00 4,500,000.00

40,601.00 500.00 8,100.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

10,000.00 12,500.00 1,500.00 60.00 73,261.00 7,326.10

Biaya Untuk 1 m2 pasang kawat harmonika

80,587.10

Pasang kawat nyamuk Kawat Harmonika Paku Tripleks Kayu Kelas III (Kayu Nantu, dll.)

1.100 0.020 0.002

M² Kg M³

Pekerja Tukang kayu Kepala Tukang

0.100 0.100 0.010

Hari / Org Hari / Org Hari / Org

Harga Satuan Dinas PU Manado 2016

36,910.00 25,000.00 4,500,000.00

40,601.00 500.00 8,100.00

100,000.00 125,000.00 150,000.00

10,000.00 12,500.00 1,500.00

Halaman 200 dari 266 halaman

NO

URAIAN PEKERJAAN Mandor

18

19

20

21

1 m²

1 m²

1 m²

1 m¹

KOEFISIEN 0.001

SATUAN Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 120,000.00

Over Head, Keuntungan, Dll

60.00 73,261.00 7,326.10

Biaya Untuk 1 m2 pasang kawat nyamuk

80,587.10

Pasang kawat kassa Kawat Nyamuk/Kasa Plastik Paku Tripleks Kayu Kelas III (Kayu Nantu, dll.)

1.100 0.020 0.002

M² Kg M³

Pekerja Tukang kayu Kepala Tukang Mandor

0.100 0.100 0.010 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

25,000.00 25,000.00 4,500,000.00

27,500.00 500.00 8,100.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

10,000.00 12,500.00 1,500.00 60.00 60,160.00 6,016.00

Biaya Untuk 1 m2 pasang kawat kassa

66,176.00

Pasang kawat burung Kawat burung Paku Tripleks Kayu Kelas III (Kayu Nantu, dll.)

1.100 0.020 0.002

M² Kg M³

Pekerja Tukang kayu Kepala Tukang Mandor

0.100 0.100 0.010 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

20,680.00 25,000.00 4,500,000.00

22,748.00 500.00 8,100.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

10,000.00 12,500.00 1,500.00 60.00 55,408.00 5,540.80

Biaya Untuk 1 m2 pasang kawat burung

60,948.80

Pasang jendela nako & tralis Naco (Kerangka dan Daun) Paku Sekrup Besi strip

1.100 0.020 0.025

M² Kg Kg

472,500.00 60,000.00 92,400.00

519,750.00 1,200.00 2,310.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.200 0.200 0.020 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

20,000.00 25,000.00 3,000.00 120.00 571,380.00 57,138.00

Biaya Untuk 1 m2 jendela nako & tralis

628,518.00

Pasang talang datar, seng bjls 25 Seng Plat BJLS 25

Harga Satuan Dinas PU Manado 2016

0.500

Lbr

65,500.00

32,750.00

Halaman 201 dari 266 halaman

NO

22

23

24

URAIAN PEKERJAAN

1 m¹

1 m¹

1 m¹

KOEFISIEN

SATUAN

Paku Kayu 2" s/d 6" Kayu Kelas III (Kayu Nantu, dll.) Cat Menie Kayu/Besi/Seng (Glotex Setara)

0.015 0.010 0.250

Kg M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.150 0.400 0.025 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 24,500.00 4,500,000.00 60,000.00

367.50 43,200.00 15,000.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 50,000.00 3,750.00 150.00 160,217.50 16,021.75

Biaya Untuk 1 m' pasang talang datar, seng bjls 25

176,239.25

Pasang talang miring, seng bjls 25 Seng Gelombang BJLS 25 Paku Kayu 2" s/d 6" Kayu Kelas III (Kayu Nantu, dll.) Cat Menie Kayu/Besi/Seng (Glotex Setara)

0.500 0.015 0.019 0.300

Lbr Kg M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.040 0.400 0.025 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

62,500.00 24,500.00 4,500,000.00 60,000.00

31,250.00 367.50 85,500.00 18,000.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

4,000.00 50,000.00 3,750.00 150.00 193,017.50 19,301.75

Biaya Untuk 1 m' pasang talang miring, seng bjls 25

212,319.25

Pasang talang 1/2 lingkaran D -10 cm, seng bjls 25 Seng Gelombang BJLS 25 Paku Kayu 2" s/d 6" Kayu Kelas III (Kayu Nantu, dll.) Cat Menie Kayu/Besi/Seng (Glotex Setara)

0.300 0.100 0.019 0.500

Lbr Kg M³ Kg

Pekerja Tukang kayu Kepala Tukang Mandor

0.150 0.250 0.025 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

62,500.00 24,500.00 4,500,000.00 60,000.00

18,750.00 2,450.00 85,500.00 30,000.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 31,250.00 3,750.00 150.00 186,850.00 18,685.00

Biaya Untuk 1 m' pasang talang 1/2 lingkaran Dia. 10 cm

205,535.00

Pasang talang 1/2 lingkaran D -10 cm, seng bjls 24 Seng Gelombang BJLS 25 Paku Kayu 2" s/d 6" Kayu Kelas III (Kayu Nantu, dll.) Besi strip

0.300 0.100 0.019 0.500

Lbr Kg M³ Kg

Pekerja

0.150

Hari / Org

Harga Satuan Dinas PU Manado 2016

62,500.00 24,500.00 4,500,000.00 92,400.00

18,750.00 2,450.00 85,500.00 46,200.00

100,000.00

15,000.00

Halaman 202 dari 266 halaman

NO

URAIAN PEKERJAAN Tukang kayu Kepala Tukang Mandor

XI. 1

2

3

4

KOEFISIEN 0.250 0.025 0.001

SATUAN Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

31,250.00 3,750.00 150.00 203,050.00 20,305.00

Biaya Untuk 1 m' pasang talang 1/2 lingkaran Dia. 10 cm

223,355.00

KUNCI DAN KACA 1 Bh

1 Bh

1 Bh

1 Bh

Pasang kunci tanam biasa Kunci tanam biasa

1.000

Bh

124,000.00

124,000.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.010 0.500 0.010 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

1,000.00 62,500.00 1,500.00 600.00 189,600.00 18,960.00

Biaya Untuk 1 buah pasang kunci tanam biasa

208,560.00

Pasang kunci tanam kamar mandi Kunci Tanam Biasa

1.000

Bh

124,000.00

124,000.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.005 0.500 0.005 0.003

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

500.00 62,500.00 750.00 300.00 188,050.00 18,805.00

Biaya Untuk 1 buah pasang kunci tanam kamar mandi

206,855.00

Pasang kunci silinder Kunci Silinder Putar

1.000

Bh

115,000.00

115,000.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.005 0.500 0.005 0.000

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

500.00 62,500.00 750.00 30.00 178,780.00 17,878.00

Biaya Untuk 1 buah pasang kunci silinder

196,658.00

Pasang engsel pintu Engsel Biasa 3"

Harga Satuan Dinas PU Manado 2016

1.000

Bh

55,000.00

55,000.00

Halaman 203 dari 266 halaman

NO

URAIAN PEKERJAAN Pekerja Tukang kayu Kepala Tukang Mandor

5

6

7

8

1 Bh

1 Bh

1 Bh

1 Bh

KOEFISIEN 0.015 0.150 0.015 0.001

SATUAN Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

1,500.00 18,750.00 2,250.00 90.00 77,590.00 7,759.00

Biaya Untuk 1 buah engsel pintu

85,349.00

Pasang engsel jendela kupu-kupu Engsel Biasa 2 1/2"

1.000

Bh

49,000.00

49,000.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.010 0.100 0.010 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

1,000.00 12,500.00 1,500.00 60.00 64,060.00 6,406.00

Biaya Untuk 1 buah engsel jendela kupu-kupu

70,466.00

Pasang engsel angin Hak Angin Biasa

1.000

Bh

30,000.00

30,000.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.020 0.200 0.020 0.010

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

2,000.00 25,000.00 3,000.00 1,200.00 61,200.00 6,120.00

Biaya Untuk 1 buah engsel angin

67,320.00

Pasang kait angin Kait angin

1.000

Bh

20,218.00

20,218.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.015 0.150 0.015 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

1,500.00 18,750.00 2,250.00 90.00 42,808.00 4,280.80

Biaya Untuk 1 buah pasang kait angin

47,088.80

Pasang door closer Door closer

1.000

Bh

412,000.00

412,000.00

Pekerja

0.050

Hari / Org

100,000.00

5,000.00

Harga Satuan Dinas PU Manado 2016

Halaman 204 dari 266 halaman

NO

URAIAN PEKERJAAN Tukang kayu Kepala Tukang Mandor

9

10

11

12

1 Bh

1 Bh

1 Bh

1 Bh

KOEFISIEN 0.500 0.050 0.003

SATUAN Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

62,500.00 7,500.00 300.00 487,300.00 48,730.00

Biaya Untuk 1 buah pasang door closer

536,030.00

Pasang kunci selot Kunci selot

1.000

Bh

35,000.00

35,000.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.020 0.200 0.020 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

2,000.00 25,000.00 3,000.00 120.00 65,120.00 6,512.00

Biaya Untuk 1 buah pasang kunci selot

71,632.00

Pasang pegangan pintu / door holder Door holder

1.000

Bh

212,500.00

212,500.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.050 0.500 0.050 0.003

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

5,000.00 62,500.00 7,500.00 300.00 287,800.00 28,780.00

Biaya Untuk 1 buah pasang pegangan pintu

316,580.00

Pasang door stop Door stop

1.000

Bh

112,500.00

112,500.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.010 0.100 0.010 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

1,000.00 12,500.00 1,500.00 60.00 127,560.00 12,756.00

Biaya Untuk 1 buah pasang door stop

140,316.00

Pasang rel pintu dorong Rel Pengaman (Guard Rail)

1.000



153,565.00

153,565.00

Pekerja Tukang kayu

0.060 0.600

Hari / Org Hari / Org

100,000.00 125,000.00

6,000.00 75,000.00

Harga Satuan Dinas PU Manado 2016

Halaman 205 dari 266 halaman

NO

URAIAN PEKERJAAN Kepala Tukang Mandor

13

14

15

16

1 Bh

1 m²

1 m²

1 m²

KOEFISIEN 0.060 0.003

SATUAN Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 150,000.00 120,000.00

Over Head, Keuntungan, Dll

9,000.00 360.00 243,925.00 24,392.50

Biaya Untuk 1 buah pasang rel pintu dorong

268,317.50

Pasang kunci lemari Kunci lemari

1.000

Bh

15,000.00

15,000.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.025 0.250 0.025 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

2,500.00 31,250.00 3,750.00 150.00 52,650.00 5,265.00

Biaya Untuk 1 buah pasang kunci lemari

57,915.00

Pasang kaca, tebal 3 mm Kaca Polos 3 mm

1.100



125,000.00

137,500.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.015 0.150 0.015 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

1,500.00 18,750.00 2,250.00 90.00 160,090.00 16,009.00

Biaya Untuk 1 m2 pasang kaca tebal 3 mm

176,099.00

Pasang kaca, tebal 5 mm Kaca Polos 5 mm

1.100



179,025.00

196,927.50

Pekerja Tukang kayu Kepala Tukang Mandor

0.015 0.150 0.015 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

1,500.00 18,750.00 2,250.00 90.00 219,517.50 21,951.75

Biaya Untuk 1 m2 pasang kaca tebal 5 mm

241,469.25

Pasang kaca, tebal 8 mm Kaca Polos 8 mm

1.100



189,000.00

207,900.00

Pekerja Tukang kayu Kepala Tukang

0.017 0.165 0.017

Hari / Org

100,000.00 125,000.00 150,000.00

1,650.00 20,625.00 2,475.00

Harga Satuan Dinas PU Manado 2016

Hari / Org Hari / Org

Halaman 206 dari 266 halaman

NO

URAIAN PEKERJAAN Mandor

17

18

19

20

1 m²

1 m²

1 m²

1 m²

KOEFISIEN 0.001

SATUAN Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 120,000.00

Over Head, Keuntungan, Dll

96.00 232,746.00 23,274.60

Biaya Untuk 1 m2 pasang kaca tebal 8 mm

256,020.60

Pasang kaca buram, tebal 12 mm Kaca Buram 12 mm Sealent

1.100 0.050

M² Kg

354,375.00 97,020.00

389,812.50 4,851.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.025 0.250 0.025 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

2,500.00 31,250.00 3,750.00 150.00 42,501.00 4,250.10

Biaya Untuk 1 m2 pasang kaca buram tebal 12 mm

46,751.10

Pasang kaca cermin, tebal 5 mm Kaca cermin tebal 5 mm

1.100



189,000.00

207,900.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.015 0.150 0.015 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

1,500.00 18,750.00 2,250.00 90.00 230,490.00 23,049.00

Biaya Untuk 1 m2 pasang kaca cermin tebal 5 mm

253,539.00

Pasang kaca cermin, tebal 8 mm Kaca cermin tebal 8 mm

1.100



236,250.00

259,875.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.015 0.150 0.015 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

1,500.00 18,750.00 2,250.00 90.00 282,465.00 28,246.50

Biaya Untuk 1 m2 pasang kaca cermin tebal 5 mm

310,711.50

Pasang kaca cermin, tebal 8 mm Kaca cermin tebal 8 mm

1.100



236,250.00

259,875.00

Pekerja Tukang kayu Kepala Tukang

0.017 0.165 0.017

Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00

1,650.00 20,625.00 2,475.00

Harga Satuan Dinas PU Manado 2016

Halaman 207 dari 266 halaman

NO

URAIAN PEKERJAAN Mandor

21

22

1 m²

1 m²

XII.

1

1

KOEFISIEN 0.001

SATUAN Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 120,000.00

Over Head, Keuntungan, Dll

96.00 284,721.00 28,472.10

Biaya Untuk 1 m2 pasang kaca cermin tebal 8 mm

313,193.10

Pasang kaca "wireglass, tebal 5 mm Kaca wireglass

1.100



177,190.00

194,909.00

Pekerja Tukang kayu Kepala Tukang Mandor

0.015 0.150 0.015 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

1,500.00 18,750.00 2,250.00 90.00 217,499.00 21,749.90

Biaya Untuk 1 m2 pasang kaca "wireglass tebal 5 mm

239,248.90

Pasang kaca patri, tebal 5 mm Kaca patri

1.100



354,375.00

389,812.50

Pekerja Tukang kayu Kepala Tukang Mandor

0.015 0.150 0.015 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

1,500.00 18,750.00 2,250.00 90.00 412,402.50 41,240.25

Biaya Untuk 1 m2 pasang kaca patri tebal 5 mm

453,642.75

PEKERJAAN PENUTUP LANTAI

1 m²

1 m²

Pasang lantai ubin pc abu-abu ukuran 40 x 40 cm Tegel Abu-Abu uk. 40x40 cm Semen PC Pasir Pasang / Beton

6.630 9.800 0.022

Bh Kg M³

15,000.00 1,269.98 260,700.00

99,450.00 12,445.76 5,605.05

Pekerja Tukang batu Kepala Tukang Mandor

0.250 0.120 0.012 0.013

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

25,000.00 15,000.00 1,800.00 1,500.00 160,800.81 16,080.08

Biaya Untuk 1 m2 pasang ubin pc abu-abu ukuran 40 x 40 cm

176,880.89

Pasang lantai ubin pc abu-abu ukuran 30 x 30 cm

Harga Satuan Dinas PU Manado 2016

Halaman 208 dari 266 halaman

NO

URAIAN PEKERJAAN

86,327.27 12,699.75 5,605.05

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

26,000.00 15,625.00 1,875.00 1,560.00 149,692.07 14,969.21

Biaya Untuk 1 m2 pasang ubin pc abu-abu ukuran 30 x 30 cm

164,661.28

4

1 m²

0.260 0.125 0.013 0.013

Bh Kg M³

2,500.00 1,269.98 260,700.00

66,250.00 13,207.74 3,519.45

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

27,000.00 16,250.00 1,950.00 1,620.00 129,797.19 12,979.72

Biaya Untuk 1 m2 pasang ubin pc abu-abu ukuran 20 x 20 cm

142,776.91

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

11.870 10.000 0.022

Pasang lantai ubin pc abu-abu ukuran 20 x 20 cm Tegel Abu-Abu uk. 20x20 cm Semen PC Pasir Pasang / Beton

3

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 7,272.73 1,269.98 260,700.00

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

SATUAN Bh Kg M³

Tegel Abu-Abu uk. 30x30 cm Semen PC Pasir Pasang / Beton

2

KOEFISIEN

26.500 10.400 0.014

0.270 0.130 0.013 0.014

Pasang lantai ubin warna ukuran 40 x 40 cm Tegel Berwarna uk. 40x40 cm Semen PC Pasir Pasang / Beton Semen warna

6.630 8.160 0.023 0.900

Bh Kg M³ Kg

15,166.67 1,269.98 260,700.00 13,860.00

100,555.00 10,363.00 5,996.10 12,474.00

Pekerja Tukang batu Kepala Tukang Mandor

0.250 0.120 0.012 0.013

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

25,000.00 15,000.00 1,800.00 1,500.00 172,688.10 17,268.81

Biaya Untuk 1 m2 pasang ubin warna ukuran 40 x 40 cm

189,956.91

Pasang lantai ubin warna ukuran 30 x 30 cm Tegel Berwarna uk. 30x30 cm Semen PC Pasir Pasang / Beton Semen warna

Harga Satuan Dinas PU Manado 2016

11.870 8.360 0.023 0.900

Bh Kg M³ Kg

7,727.27 1,269.98 260,700.00 13,860.00

91,722.73 10,616.99 5,996.10 12,474.00

Halaman 209 dari 266 halaman

NO

URAIAN PEKERJAAN Pekerja Tukang batu Kepala Tukang Mandor

5

1 m²

7

1 m²

Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

Biaya Untuk 1 m2 pasang ubin warna ukuran 30 x 30 cm

180,520.80

100,000.00 125,000.00 150,000.00 120,000.00

Pasang lantai ubin warna ukuran 20 x 20 cm Bh Kg M³ Kg

2,400.00 1,269.98 260,700.00 13,860.00

63,600.00 11,124.98 5,996.10 12,474.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

27,000.00 16,250.00 1,950.00 1,620.00 140,015.08 14,001.51

Biaya Untuk 1 m2 pasang ubin warna ukuran 20 x 20 cm

154,016.59

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

0.250 0.120 0.012 0.013

SATUAN

25,000.00 15,000.00 1,800.00 1,500.00 164,109.82 16,410.98

Tegel Berwarna uk. 20x20 cm Semen PC Pasir Pasang / Beton Semen warna

6

KOEFISIEN

26.500 8.760 0.023 0.900

0.270 0.130 0.013 0.014

Pasang lantai granito warna ukuran 40 x 40 cm Tegel Granito uk. 40x40 cm Semen PC Pasir Pasang / Beton Semen warna

6.930 9.800 0.022 1.300

Bh Kg M³ Kg

70,000.00 1,269.98 260,700.00 13,860.00

485,100.00 12,445.76 5,605.05 18,018.00

Pekerja Tukang batu Kepala Tukang Mandor

0.250 0.120 0.012 0.013

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

25,000.00 15,000.00 1,800.00 1,500.00 564,468.81 56,446.88

Biaya Untuk 1 m2 pasang lantai granito ukuran 40 x 40 cm

620,915.69

Pasang lantai granito warna ukuran 30 x 30 cm Tegel Granito uk. 30x30 cm Semen PC Pasir Pasang / Beton Semen warna

Pekerja Tukang batu Kepala Tukang Mandor

Harga Satuan Dinas PU Manado 2016

11.870 10.000 0.022 1.500

0.260 0.125 0.013 0.013

Bh Kg M³ Kg

273,000.00 1,269.98 260,700.00 13,860.00

3,240,510.00 12,699.75 5,605.05 20,790.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

26,000.00 15,625.00 1,875.00 1,560.00

Halaman 210 dari 266 halaman

NO

8

9

URAIAN PEKERJAAN

1 m²

1 m²

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 3,324,664.80 332,466.48

Biaya Untuk 1 m2 pasang lantai granito ukuran 30 x 30 cm

3,657,131.28

Pasang lantai teralus kerang ukuran 40 x 40 cm Tegel teralux marmer uk. 40 x 40 cm Semen PC Pasir Pasang / Beton Semen warna

6.250 8.800 0.022 1.300

Bh Kg M³ Kg

100,405.00 1,269.98 260,700.00 13,860.00

627,531.25 11,175.78 5,605.05 18,018.00

Pekerja Tukang batu Kepala Tukang Mandor

0.250 0.120 0.012 0.013

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

25,000.00 15,000.00 1,800.00 1,500.00 705,630.08 70,563.01

Biaya Untuk 1 m2 pasang lantai teralux kerang ukuran 40 x 40 cm

776,193.09

Pasang lantai ubin teralux kerang ukuran 30 x 30 cm Bh Kg M³ Kg

33,075.00 1,269.98 260,700.00 13,860.00

392,600.25 12,699.75 5,605.05 15,592.50

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

25,000.00 15,000.00 1,800.00 1,500.00 469,797.55 46,979.76

Biaya Untuk 1 m2 pasang lantai teralux kerang ukuran 30 x 30 cm

516,777.31

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

SATUAN

Over Head, Keuntungan, Dll

Tegel teralux kerang uk. 30 x 30 cm Semen PC Pasir Pasang / Beton Semen warna

10

KOEFISIEN

11.870 10.000 0.022 1.125

0.250 0.120 0.012 0.013

Pasang lantai ubin teralux marmer ukuran 60 x 60 cm Tegel teralux marmer uk. 60 x 60 cm Semen PC Pasir Pasang / Beton Semen warna

3.100 8.190 0.045 1.000

Bh Kg M³ Kg

177,190.00 1,269.98 260,700.00 13,860.00

549,289.00 10,401.10 11,731.50 13,860.00

Pekerja Tukang batu Kepala Tukang Mandor

0.250 0.120 0.012 0.013

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

25,000.00 15,000.00 1,800.00 1,500.00 628,581.60 62,858.16

Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2016

Halaman 211 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Biaya Untuk 1 m2 pasang lantai ubin teralux marmer ukuran 60 x 60 cm 11

12

13

14

1 m²

1 m¹

1 m¹

1 m¹

691,439.75

Pasang lantai ubin teralux marmer ukuran 40 x 40 cm Tegel teralux kerang uk. 40 x 40 cm Semen PC Pasir Pasang / Beton Semen warna

6.250 8.800 0.022 1.300

Bh Kg M³ Kg

49,615.00 1,269.98 260,700.00 13,860.00

310,093.75 11,175.78 5,605.05 18,018.00

Pekerja Tukang batu Kepala Tukang Mandor

0.672 0.224 0.220 0.034

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

67,200.00 28,000.00 33,000.00 4,080.00 477,172.58 47,717.26

Biaya Untuk 1 m2 pasang lantai teralux marmer ukuran 40 x 40 cm

524,889.84

Pasang plint ubin pc abuabu ukuran 15 x 30 cm Tegel Plint pc abu-abu uk. 15x30 cm Semen PC Pasir Pasang / Beton

3.300 1.560 0.004

Bh Kg M³

2,070.00 1,269.98 260,700.00

Pekerja Tukang batu Kepala Tukang Mandor

0.060 0.030 0.003 0.003

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

6,831.00 1,981.16 1,042.80

Over Head, Keuntungan, Dll

3,750.00 450.00 360.00 14,414.96 1,441.50

Biaya Untuk 1 m' pasang plint ubin pc abu-abu ukuran 15 x 30 cm

15,856.46

Pasang plint ubin pc abu-abu ukuran 10 x 30 cm Tegel Plint pc abu-abu uk. 10x30 cm Semen PC Pasir Pasang / Beton

3.300 1.560 0.003

Bh Kg M³

1,780.00 1,269.98 260,700.00

Pekerja Tukang batu Kepala Tukang Mandor

0.060 0.030 0.003 0.003

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

5,874.00 1,981.16 782.10

Over Head, Keuntungan, Dll

3,750.00 450.00 360.00 13,197.26 1,319.73

Biaya Untuk 1 m' pasang plint ubin pc abu-abu ukuran 10 x 30 cm

14,516.99

Pasang plint ubin pc abu-abu ukuran 10 x 40 cm Tegel Plint pc abu-abu uk. 10x40 cm

Harga Satuan Dinas PU Manado 2016

2.650

Bh

1,890.00

5,008.50

Halaman 212 dari 266 halaman

NO

15

16

17

URAIAN PEKERJAAN

1 m¹

1 m¹

1 m¹

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Semen PC Pasir Pasang / Beton

1.560 0.003

Kg M³

1,269.98 260,700.00

Pekerja Tukang batu Kepala Tukang Mandor

0.060 0.030 0.003 0.003

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

1,981.16 782.10

Over Head, Keuntungan, Dll

3,750.00 450.00 360.00 12,331.76 1,233.18

Biaya Untuk 1 m' pasang plint ubin pc abu-abu ukuran 10 x 40 cm

13,564.94

Pasang plint ubin pc warna ukuran 10 x 20 cm Tegel Plint warna uk. 10x20 cm Semen PC Pasir Pasang / Beton Semen warna

5.300 1.200 0.003 0.190

Bh Kg M³ Kg

2,655.00 1,269.98 260,700.00 13,860.00

14,071.50 1,523.97 782.10 2,633.40

Pekerja Tukang batu Kepala Tukang Mandor

0.060 0.030 0.003 0.003

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

6,000.00 3,750.00 450.00 360.00 29,570.97 2,957.10

Biaya Untuk 1 m' pasang plint ubin pc warna ukuran 10 x 20 cm

32,528.07

Pasang plint ubin pc warna ukuran 10 x 40 cm Tegel Plint pc warna uk. 10x40 cm Semen PC Pasir Pasang / Beton Semen warna

2.650 1.200 0.003 0.100

Bh Kg M³ Kg

2,079.00 1,269.98 260,700.00 13,860.00

5,509.35 1,523.97 782.10 1,386.00

Pekerja Tukang batu Kepala Tukang Mandor

0.080 0.040 0.004 0.004

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

8,000.00 5,000.00 600.00 480.00 23,281.42 2,328.14

Biaya Untuk 1 m' pasang plint ubin pc warna ukuran 10 x 40 cm

25,609.56

Pasang plint ubin granito ukuran 10 x 40 cm Tegel Plint granito uk. 10x40 cm Semen PC Pasir Pasang / Beton Semen warna

Harga Satuan Dinas PU Manado 2016

2.650 1.200 0.003 0.100

Bh Kg M³ Kg

40,165.00 1,269.98 260,700.00 13,860.00

106,437.25 1,523.97 782.10 1,386.00

Halaman 213 dari 266 halaman

NO

URAIAN PEKERJAAN

Pekerja Tukang batu Kepala Tukang Mandor

18

19

20

1 m¹

1 m¹

1 m¹

KOEFISIEN

0.060 0.030 0.003 0.003

SATUAN

Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

6,000.00 3,750.00 450.00 360.00 120,689.32 12,068.93

Biaya Untuk 1 m' pasang plint ubin granito warna ukuran 10 x 40 cm

132,758.25

Pasang plint ubin granito ukuran 10 x 30 cm Tegel Plint granito uk. 10x30 cm Semen PC Pasir Pasang / Beton Semen warna

3.330 1.650 0.003 0.100

Bh Kg M³ Kg

35,440.00 1,269.98 260,700.00 13,860.00

118,015.20 2,095.46 834.24 1,386.00

Pekerja Tukang batu Kepala Tukang Mandor

0.900 0.090 0.009 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

90,000.00 11,250.00 1,350.00 540.00 225,470.90 22,547.09

Biaya Untuk 1 m' pasang plint ubin granito warna ukuran 10 x 30 cm

248,017.99

Pasang plint ubin teralux kerang ukuran 10 x 40 cm Tegel Plint teralux kerang uk. 10x40 cm Semen PC Pasir Pasang / Beton Semen warna

2.500 1.650 0.003 0.100

Bh Kg M³ Kg

36,620.00 1,269.98 260,700.00 13,860.00

91,550.00 2,095.46 834.24 1,386.00

Pekerja Tukang batu Kepala Tukang Mandor

0.900 0.090 0.009 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

90,000.00 11,250.00 1,350.00 540.00 199,005.70 19,900.57

Biaya Untuk 1 m' pasang plint teralux kerang warna ukuran 10 x 40 cm

218,906.27

Pasang plint ubin teralux kerang ukuran 10 x 30 cm Tegel Plint teralux kerang uk. 10x30 cm Semen PC Pasir Pasang / Beton Semen warna

3.330 1.650 0.003 0.100

Bh Kg M³ Kg

36,620.00 1,269.98 260,700.00 13,860.00

121,944.60 2,095.46 834.24 1,386.00

Pekerja Tukang batu Kepala Tukang

0.900 0.090 0.009

Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00

90,000.00 11,250.00 1,350.00

Harga Satuan Dinas PU Manado 2016

Halaman 214 dari 266 halaman

NO

URAIAN PEKERJAAN Mandor

21

22

23

1 m¹

1 m¹

1 m¹

KOEFISIEN 0.005

SATUAN Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 120,000.00

Over Head, Keuntungan, Dll

540.00 229,400.30 22,940.03

Biaya Untuk 1 m' pasang plint ubin teralux kerang warna ukuran 10 x 30 cm

252,340.33

Pasang plint ubin teralux marmer ukuran 10 x 60 cm Tegel Plint teralux marmer uk. 10x60 cm Semen PC Pasir Pasang / Beton Semen warna

1.700 1.650 0.003 0.100

Bh Kg M³ Kg

44,305.00 1,269.98 260,700.00 13,860.00

75,318.50 2,095.46 834.24 1,386.00

Pekerja Tukang batu Kepala Tukang Mandor

0.900 0.090 0.009 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

90,000.00 11,250.00 1,350.00 540.00 182,774.20 18,277.42

Biaya Untuk 1 m' pasang plint ubin teralux marmer warna ukuran 10 x 60 cm

201,051.62

Pasang plint ubin teralux marmer ukuran 10 x 40 cm Tegel Plint teralux marmer uk. 10x40 cm Semen PC Pasir Pasang / Beton Semen warna

2.630 1.650 0.003 0.100

Bh Kg M³ Kg

42,525.00 1,269.98 260,700.00 13,860.00

111,840.75 2,095.46 834.24 1,386.00

Pekerja Tukang batu Kepala Tukang Mandor

0.900 0.090 0.009 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

90,000.00 11,250.00 1,350.00 540.00 219,296.45 21,929.64

Biaya Untuk 1 m' pasang plint ubin teralux marmer warna ukuran 10 x 40 cm

241,226.09

Pasang plint ubin teralux marmer ukuran 10 x 30 cm Tegel Plint teralux marmer uk. 10x30 cm Semen PC Pasir Pasang / Beton Semen warna

3.330 1.650 0.003 0.100

Bh Kg M³ Kg

41,345.00 1,269.98 260,700.00 13,860.00

137,678.85 2,095.46 834.24 1,386.00

Pekerja Tukang batu Kepala Tukang Mandor

0.900 0.090 0.009 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

90,000.00 11,250.00 1,350.00 540.00 245,134.55 24,513.45

Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2016

Halaman 215 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Biaya Untuk 1 m' pasang plint ubin teralux marmer warna ukuran 10 x 30 cm

24

1 m²

Pasang lantai keramik artistik 10 x 20 cm Bh Kg M³ Kg

8,270.00 1,269.98 260,700.00 13,860.00

413,500.00 14,452.32 10,949.40 20,790.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

62,000.00 43,750.00 5,250.00 3,600.00 574,291.72 57,429.17

Biaya Untuk 1 m2 pasang lantai keramik artistik 10 x 20 cm

631,720.89

Ubin keramik arttistik uk. 10 x 20 cm Semen PC Pasir Pasang / Beton Semen warna

Pekerja Tukang batu Kepala Tukang Mandor

25

1 m²

0.620 0.350 0.035 0.030

Bh Kg M³ Kg

4,140.00 1,269.98 260,700.00 13,860.00

414,000.00 14,452.32 10,949.40 27,720.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

62,000.00 43,750.00 5,250.00 3,600.00 581,721.72 58,172.17

Biaya Untuk 1 m2 pasang lantai keramik artistik 10 x 10 cm

639,893.89

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

50.000 11.380 0.042 1.500

Pasang lantai keramik artistik 10 x 10 cm Ubin keramik arttistik uk. 10 x 10 cm Semen PC Pasir Pasang / Beton Semen warna

26

269,648.00

100.000 11.380 0.042 2.000

0.620 0.350 0.035 0.030

Pasang lantai keramik artistik 5 x 20 cm Bh Kg M³ Kg

4,140.00 1,269.98 260,700.00 13,860.00

414,000.00 14,452.32 10,949.40 20,790.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

62,000.00 43,750.00 5,250.00 3,600.00 574,791.72 57,479.17

Biaya Untuk 1 m2 pasang lantai keramik artistik 5 x 20 cm

632,270.89

Ubin keramik arttistik uk. 5 x 20 cm Semen PC Pasir Pasang / Beton Semen warna

Pekerja Tukang batu Kepala Tukang Mandor

Harga Satuan Dinas PU Manado 2016

100.000 11.380 0.042 1.500

0.620 0.350 0.035 0.030

Halaman 216 dari 266 halaman

NO 27

28

URAIAN PEKERJAAN 1 m¹

1 m¹

30

1 m¹

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Ubin keramik arttistik uk. 10 x 20 cm Semen PC Pasir Pasang / Beton Semen warna

5.000 1.650 0.003 0.100

Bh Kg M³ Kg

8,270.00 1,269.98 260,700.00 13,860.00

41,350.00 2,095.46 834.24 1,386.00

Pekerja Tukang batu Kepala Tukang Mandor

0.090 0.090 0.009 0.005

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

9,000.00 11,250.00 1,350.00 540.00 67,805.70 6,780.57

Biaya Untuk 1 m' pasang plint keramik artistik 5 x 20 cm

74,586.27

Pasang plint keramik artistik 10 x 10 cm Bh Kg M³ Kg

4,140.00 1,269.98 260,700.00 13,860.00

41,400.00 2,095.46 834.24 1,663.20

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

9,000.00 11,250.00 1,350.00 540.00 68,132.90 6,813.29

Biaya Untuk 1 m' pasang plint keramik artistik 10 x 10 cm

74,946.19

Pekerja Tukang batu Kepala Tukang Mandor

1 m¹

SATUAN

Pasang plint keramik artistik 10 x 20 cm

Ubin keramik arttistik uk. 10 x 10 cm Semen PC Pasir Pasang / Beton Semen warna

29

KOEFISIEN

10.000 1.650 0.003 0.120

0.090 0.090 0.009 0.005

Internal cove artistik (5x5x 20) cm Internal cove artistik (5 x5x20) cm Semen PC Pasir Pasang / Beton Semen warna

5.300 1.415 0.039 1.200

Bh Kg M³ Kg

5,905.00 1,269.98 260,700.00 13,860.00

31,296.50 1,797.01 10,167.30 16,632.00

Pekerja Tukang batu Kepala Tukang Mandor

0.750 0.450 0.045 0.038

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

75,000.00 56,250.00 6,750.00 4,500.00 202,392.81 20,239.28

Biaya Untuk 1 m' pasang internal cove artistik 5 x 5 x 20 cm

222,632.10

Pasang plint vinyil tanpa adukan Lt vinyl karet 30x30 kwl l Lem vinyil

Harga Satuan Dinas PU Manado 2016

3.500 0.080

M² Kg

94,500.00 32,490.00

330,750.00 2,599.20

Halaman 217 dari 266 halaman

NO

URAIAN PEKERJAAN

Pekerja Tukang batu Kepala Tukang Mandor

31

1 m²

Biaya Untuk 1 m' pasang plint vinyil tanpa adukan

388,332.12

Bh Kg M³ Kg

2,125.00 1,269.98 260,700.00 13,860.00

93,500.00 14,452.32 10,949.40 20,790.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

62,000.00 43,750.00 5,250.00 3,600.00 254,291.72 25,429.17

Biaya Untuk 1 m2 pasang lantai keramik 15 x 15 cm

279,720.89

44.000 11.380 0.042 1.500

0.620 0.350 0.035 0.030

Pasang lantai keramik 20 x 20 cm Bh Kg M³ Kg

3,000.00 1,269.98 260,700.00 13,860.00

75,000.00 14,452.32 10,949.40 20,790.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

62,000.00 43,750.00 5,250.00 3,600.00 235,791.72 23,579.17

Biaya Untuk 1 m2 pasang lantai keramik 20x20 cm

259,370.89

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

100,000.00 125,000.00 150,000.00 120,000.00

Pasang lantai keramik 15 x 15 cm

Tegel Keramik uk. 20x20 cm Semen PC Pasir Pasang / Beton Semen warna

33

Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

0.080 0.080 0.008 0.004

SATUAN

8,000.00 10,000.00 1,200.00 480.00 353,029.20 35,302.92

Tegel Keramik uk. 15x15 cm Semen PC Pasir Pasang / Beton Semen warna

32

KOEFISIEN

25.000 11.380 0.042 1.500

0.620 0.350 0.035 0.030

Pasang lantai keramik 25 x 25 cm Tegel Keramik uk. 25x25 cm Semen PC Pasir Pasang / Beton Semen warna

Pekerja Tukang batu Kepala Tukang Mandor

Harga Satuan Dinas PU Manado 2016

16.000 11.380 0.042 1.500

0.620 0.350 0.035 0.030

Bh Kg M³ Kg

4,700.00 1,269.98 260,700.00 13,860.00

75,200.00 14,452.32 10,949.40 20,790.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

62,000.00 43,750.00 5,250.00 3,600.00 235,991.72

Halaman 218 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

23,599.17

Biaya Untuk 1 m2 pasang lantai keramik 25x25 cm

34

1 m²

Pasang lantai keramik 15 x 20 cm Bh Kg M³ Kg

2,365.00 1,269.98 260,700.00 13,860.00

78,872.75 14,452.32 10,949.40 20,790.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

62,000.00 43,750.00 5,250.00 3,600.00 239,664.47 23,966.45

Biaya Untuk 1 m2 pasang lantai keramik 15x20 cm

263,630.91

Tegel Keramik uk. 15x20 cm Semen PC Pasir Pasang / Beton Semen warna

Pekerja Tukang batu Kepala Tukang Mandor

35

1 m²

0.620 0.350 0.035 0.030

Bh Kg M³ Kg

56,115.00 1,269.98 260,700.00 13,860.00

666,085.05 17,970.15 10,167.30 27,720.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

62,000.00 43,750.00 5,250.00 3,600.00 836,542.50 83,654.25

Biaya Untuk 1 m2 pasang lantai keramik mosaik 30x30 cm, ex lokal

920,196.75

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

33.350 11.380 0.042 1.500

Pasang lantai mosaik 30 x 30 cm, ex lokal Tegel mosaik 30 x 30 cm, ex lokal Semen PC Pasir Pasang / Beton Semen warna

36

259,590.89

11.870 14.150 0.039 2.000

0.620 0.350 0.035 0.030

Pasang lantai marmer Marmer Semen PC Pasir Pasang / Beton Semen warna

Bh Kg M³ Kg

1,550,000.00 1,269.98 260,700.00 13,860.00

1,630,600.00 17,970.15 10,167.30 27,720.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

62,000.00 43,750.00 5,250.00 3,600.00 1,801,057.45 180,105.74

Biaya Untuk 1 m2 pasang lantai marmer

1,981,163.19

Pekerja Tukang batu Kepala Tukang Mandor

Harga Satuan Dinas PU Manado 2016

1.052 14.150 0.039 2.000

0.620 0.350 0.035 0.030

Hari / Org Hari / Org Hari / Org Hari / Org

Halaman 219 dari 266 halaman

NO

37

38

39

40

URAIAN PEKERJAAN

1 m²

1 m²

1 m²

1 m²

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Pasang lantai karpet 100% wool Feltex carpet 100% wool T-21 Lem vinyil

1.050 0.350

M² Kg

194,905.00 32,490.00

204,650.25 11,371.50

Pekerja Tukang batu Kepala Tukang Mandor

0.170 0.170 0.017 0.009

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

17,000.00 21,250.00 2,550.00 1,020.00 257,841.75 25,784.18

Biaya Untuk 1 m2 pasang lantai karpet 100% wool

283,625.93

Pasang lantai karpet 80% wool, 20% nylon Carpet 80% wool, 20% nylon Lem vinyil

1.050 0.350

M² Kg

94,500.00 32,490.00

99,225.00 11,371.50

Pekerja Tukang batu Kepala Tukang Mandor

0.170 0.170 0.017 0.009

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

17,000.00 21,250.00 2,550.00 1,020.00 152,416.50 15,241.65

Biaya Untuk 1 m2 pasang lantai karpet 80% wool, 20% nylon

167,658.15

Pasang underlyer, tebal 6 mm Underlyer tebal 6 mm/rubber corrugated

1.050



200,815.00

210,855.75

Pekerja Tukang batu Kepala Tukang Mandor

0.120 0.120 0.012 0.006

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

12,000.00 15,000.00 1,800.00 720.00 240,375.75 24,037.58

Biaya Untuk 1 m2 pasang underlyer, tebal 6 mm

264,413.33

Pasang lantai karpet Carpet Lem vinyil

1.050 0.350

M² Kg

76,780.00 32,490.00

80,619.00 11,371.50

Pekerja Tukang batu Kepala Tukang Mandor

0.170 0.170 0.017 0.009

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

17,000.00 21,250.00 2,550.00 1,020.00 133,810.50 13,381.05

Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2016

Halaman 220 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Biaya Untuk 1 m2 pasang lantai karpet

41

42

43

1 m²

1 m²

1 m²

Pasang lantai parquet jati Parquet jati Lem vinyil

1.050 0.600

M² Kg

350,000.00 32,490.00

367,500.00 19,494.00

Pekerja Tukang batu Kepala Tukang Mandor

0.650 0.350 0.035 0.033

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

65,000.00 43,750.00 5,250.00 3,900.00 504,894.00 50,489.40

Biaya Untuk 1 m2 pasang lantai parquet jati

555,383.40

Pasang gymfloor Gymfloor Lem vinyil

1.050 0.600

M² Kg

340,000.00 32,490.00

357,000.00 19,494.00

Pekerja Tukang batu Kepala Tukang Mandor

0.650 0.350 0.035 0.033

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

65,000.00 43,750.00 5,250.00 3,900.00 494,394.00 49,439.40

Biaya Untuk 1 m2 pasang gymfloor

543,833.40

Pasang dinding porselin 11 x 11 cm, putih Bh Kg M³

1,305.00 1,269.98 260,700.00

108,315.00 11,810.77 4,692.60

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

62,000.00 62,500.00 7,500.00 3,600.00 260,418.37 26,041.84

Biaya Untuk 1 m2 pasang dinding porselin 11 x 11 cm, putih

286,460.20

Tegel Keramik uk. 11x11 cm Semen pc Pasir Pasang / Beton

Pekerja Tukang batu Kepala Tukang Mandor

44

1 m²

147,191.55

83.000 9.300 0.018

0.620 0.500 0.050 0.030

Pasang dinding keramik artistik 10 x 20 cm Ubin keramik arttistik uk. 10 x 20 cm Semen pc Pasir Pasang / Beton Semen warna

Harga Satuan Dinas PU Manado 2016

50.000 9.300 0.018 1.500

Bh Kg M³ Kg

8,270.00 1,269.98 260,700.00 13,860.00

413,500.00 11,810.77 4,692.60 20,790.00

Halaman 221 dari 266 halaman

NO

URAIAN PEKERJAAN

Pekerja Tukang batu Kepala Tukang Mandor

45

1 m²

Biaya Untuk 1 m2 pasang dinding keramik artistik 10 x 20 cm, warna

635,132.70

Bh Kg M³ Kg

4,140.00 1,269.98 260,700.00 13,860.00

414,000.00 11,810.77 4,692.60 20,790.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

60,000.00 56,250.00 6,750.00 3,600.00 577,893.37 57,789.34

Biaya Untuk 1 m2 pasang dinding keramik artistik 5 x 20 cm

635,682.70

100.000 9.300 0.018 1.500

0.600 0.450 0.045 0.030

Pasang dinding keramik 10 x 20 cm Bh Kg M³ Kg

1,500.00 1,269.98 260,700.00 13,860.00

75,000.00 11,810.77 4,692.60 20,790.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

60,000.00 56,250.00 6,750.00 3,600.00 238,893.37 23,889.34

Biaya Untuk 1 m2 pasang dinding keramik 10 x 20 cm

262,782.70

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

100,000.00 125,000.00 150,000.00 120,000.00

Pasang dinding keramik artistik 5 x 20 cm

Tegel Keramik uk. 10x20 cm Semen pc Pasir Pasang / Beton Semen warna

47

Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

0.600 0.450 0.045 0.030

SATUAN

60,000.00 56,250.00 6,750.00 3,600.00 577,393.37 57,739.34

Ubin keramik arttistik uk. 5 x 20 cm Semen pc Pasir Pasang / Beton Semen warna

46

KOEFISIEN

50.000 9.300 0.018 1.500

0.600 0.450 0.045 0.030

Pasang dinding keramik 15 x 15 cm Tegel Keramik uk. 15x15 cm Semen pc Pasir Pasang / Beton Semen warna

Pekerja Tukang batu Kepala Tukang Mandor

Harga Satuan Dinas PU Manado 2016

45.000 9.300 0.018 1.500

0.600 0.450 0.045 0.030

Bh Kg M³ Kg

2,125.00 1,269.98 260,700.00 13,860.00

95,625.00 11,810.77 4,692.60 20,790.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

60,000.00 56,250.00 6,750.00 3,600.00

Halaman 222 dari 266 halaman

NO

48

URAIAN PEKERJAAN

1 m²

Biaya Untuk 1 m2 pasang dinding keramik artistik 15 x 15 cm

285,470.20

Pasang dinding keramik 20 x 20 cm Bh Kg M³ Kg

3,000.00 1,269.98 260,700.00 13,860.00

75,000.00 11,810.77 4,692.60 20,790.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

60,000.00 12,500.00 6,750.00 3,600.00 195,143.37 19,514.34

Biaya Untuk 1 m2 pasang dinding keramik 20 x 20 cm

214,657.70

0.600 0.100 0.045 0.030

Bh Kg M³ Kg

1,500.00 1,269.98 260,700.00 13,860.00

75,000.00 11,810.77 4,692.60 20,790.00

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

60,000.00 15,625.00 1,875.00 3,600.00 193,393.37 19,339.34

Biaya Untuk 1 m2 pasang dinding keramik 10 x 20 cm

212,732.70

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

25.000 9.300 0.018 1.500

Pasang dinding keramik 10 x 20 cm Tegel Keramik uk. 10x20 cm Semen pc Pasir Pasang / Beton Semen warna

50

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 259,518.37 25,951.84

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

SATUAN

Over Head, Keuntungan, Dll

Tegel Keramik uk. 20x20 cm Semen pc Pasir Pasang / Beton Semen warna

49

KOEFISIEN

50.000 9.300 0.018 1.500

0.600 0.125 0.013 0.030

Pasang dinding marmer Marmer Paku pancing Semen pc Pasir Pasang / Beton Semen warna

Bh Kg Kg M³ Kg

1,550,000.00 35,000.00 1,269.98 260,700.00 13,860.00

1,581,000.00 70,000.00 15,798.49 6,517.50 20,790.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

72,000.00 81,250.00 9,750.00 4,200.00 1,861,305.99 186,130.60

Biaya Untuk 1 m2 pasang dinding marmer

2,047,436.59

Pekerja Tukang batu Kepala Tukang Mandor

Harga Satuan Dinas PU Manado 2016

1.020 2.000 12.440 0.025 1.500

0.720 0.650 0.065 0.035

Hari / Org Hari / Org Hari / Org Hari / Org

Halaman 223 dari 266 halaman

NO

51

URAIAN PEKERJAAN

1 m²

850.00 1,269.98 260,700.00

51,000.00 15,798.49 6,517.50

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

65,000.00 62,500.00 7,500.00 3,600.00 211,915.99 21,191.60

Biaya Untuk 1 m2 pasang dinding bata pelapis 7x3x24 cm

233,107.59

1,780.00 1,269.98 260,700.00

142,400.00 15,798.49 6,517.50

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

62,000.00 43,750.00 52,500.00 3,600.00 326,565.99 32,656.60

Biaya Untuk 1 m2 pasang dinding bata klinker 5x5x25 cm

359,222.59

0.620 0.350 0.350 0.030

M² Kg

94,500.00 32,490.00

1,044,225.00 11,371.50

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 18,750.00 2,250.00 900.00 1,092,496.50 109,249.65

Biaya Untuk 1 m2 pasang lantai vinyl karet 30 x 30 cm KL I

1,201,746.15

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

80.000 12.440 0.025

Pasang lantai vinyl karet 30 x 30 cm KL I Lt vinyl karet 30x30 kwl l Lem vinyil

54

0.650 0.500 0.050 0.030

Bh Kg M³

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

60.000 12.440 0.025

Pasang dinding bata klinker 5x5x25 cm Batu Bata Klinker Uk. 5 x 5 x 25 Semen pc Pasir Pasang / Beton

53

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Bh Kg M³

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

SATUAN

Pasang dinding bata pelapis 7x3x24 cm Bata Merah Semen pc Pasir Pasang / Beton

52

KOEFISIEN

11.050 0.350

0.150 0.150 0.015 0.008

Pasang lantai vinyl karet 30 x 30 cm KL II Lt vinyl karet 30x30 kwl II Lem vinyil

Pekerja

Harga Satuan Dinas PU Manado 2016

11.050 0.350

0.150

M² Kg

100,405.00 32,490.00

1,109,475.25 11,371.50

Hari / Org

100,000.00

15,000.00

Halaman 224 dari 266 halaman

NO

URAIAN PEKERJAAN Tukang batu Kepala Tukang Mandor

55

1 m²

Biaya Untuk 1 m2 pasang lantai vinyl karet 30 x 30 cm KL II

1,273,521.43

Bh Kg

14,770.00 32,490.00

163,208.50 11,371.50

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 18,750.00 2,250.00 900.00 211,480.00 21,148.00

Biaya Untuk 1 m2 pasang lantai vinyl asbes 30 x 30 cm

232,628.00

58

1 m²

11.050 0.350

0.150 0.150 0.015 0.008

Pasang lantai vinyl motif kembang 30 x 30 cm Bh Kg

20,680.00 32,490.00

228,514.00 11,371.50

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 18,750.00 2,250.00 900.00 276,785.50 27,678.55

Biaya Untuk 1 m2 pasang lantai vinyl motif kembang 30 x 30 cm

304,464.05

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

125,000.00 150,000.00 120,000.00

Pasang lantai vinyl asbes 30 x 30 cm

Vinyil motif kembang Ex DN Lem vinyil

57

Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

Pekerja Tukang batu Kepala Tukang Mandor

1 m²

0.150 0.015 0.008

SATUAN

18,750.00 2,250.00 900.00 1,157,746.75 115,774.68

Vinyil asbes Lem vinyil

56

KOEFISIEN

11.050 0.350

0.150 0.150 0.015 0.008

Pasang wall covering lebar 50 cm Vinyil wall covering lebar 50 cm Lem vinyil

1.100 0.250

M² Kg

118,125.00 32,490.00

129,937.50 8,122.50

Pekerja Tukang batu Kepala Tukang Mandor

0.750 0.170 0.017 0.009

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

75,000.00 21,250.00 2,550.00 1,020.00 237,880.00 23,788.00

Biaya Untuk 1 m2 pasang lantai vinyl wall covering

261,668.00

Floor hardener ferrovax

Harga Satuan Dinas PU Manado 2016

Halaman 225 dari 266 halaman

NO

URAIAN PEKERJAAN

XIII.

1.

2

3

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Floor hardener

3.000

Kg

32,490.00

97,470.00

Pekerja Tukang batu Kepala Tukang Mandor

0.120 0.120 0.012 0.006

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

12,000.00 15,000.00 1,800.00 720.00 126,990.00 12,699.00

Biaya Untuk 1 m2 floor hardener ferrovax

139,689.00

PEKERJAAN PENGECATAN

1 m²

1 m²

1 m²

Mengikis/mengerok permukaan cat tembok lama Soda api

0.050

Kg

13,650.00

682.50

Pekerja Tukang cat Kepala Tukang Mandor

0.150

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 300.00 15,982.50 1,598.25

Biaya Untuk 1 m2 mengikis cat tembok lama

17,580.75

0.003

Mencuci bidang permukaan tembok yang pernah di cat Sabun

0.050

Kg

17,720.00

886.00

Pekerja Tukang cat Kepala Tukang Mandor

0.150

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 300.00 16,186.00 1,618.60

Biaya Untuk 1 m2 mencuci permukaan tembok yang pernah di cat

17,804.60

0.003

Mengerok karat cat lama permukaan baja dengan cara manual Sabun

0.050

Kg

17,720.00

886.00

Pekerja Tukang cat Kepala Tukang Mandor

0.150

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 300.00 16,186.00 1,618.60

Biaya Untuk 1 m2 mengerok cat lama permukaan baja

17,804.60

Harga Satuan Dinas PU Manado 2016

0.003

Halaman 226 dari 266 halaman

NO

4

5

6

7

URAIAN PEKERJAAN

1 m²

1 m²

1 m²

1 m²

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Menyabun permukaan tembok lama Sabun

0.050

Kg

17,720.00

886.00

Pekerja Tukang cat Kepala Tukang Mandor

0.150

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 300.00 16,186.00 1,618.60

Biaya Untuk 1 m2 menyabun permukaan tembok lama

17,804.60

0.003

Mendempul dan menggosok kayu Dempul Kayu/Wood Filler (Impra Setara) Minyak Cat / Thiner Batu apung

0.080 0.020 0.010

Kg Ltr Kg

65,000.00 22,500.00 7,090.00

5,200.00 450.00 70.90

Pekerja Tukang cat Kepala Tukang Mandor

0.040 0.040 0.004 0.003

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

4,000.00 5,000.00 600.00 300.00 15,620.90 1,562.09

Biaya Untuk 1 m2 mendempul dan menggosok kayu

17,182.99

Plamur Plamir Ampelas

0.200 0.100

Kg Lbr

50,000.00 5,000.00

10,000.00 500.00

Pekerja Tukang cat Kepala Tukang Mandor

0.002 0.015 0.030 0.002

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

150.00 1,875.00 4,500.00 180.00 17,205.00 1,720.50

Biaya Untuk 1 m2 Plamur

18,925.50

Plamur permukaan gypsum Paper tape Compound gypsum

1.100 0.100

M¹ Kg

7,500.00 11,815.00

8,250.00 1,181.50

Pekerja Tukang Kepala Tukang Mandor

0.005 0.050 0.025 0.001

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

500.00 6,250.00 3,750.00 150.00 20,081.50 2,008.15

Over Head, Keuntungan, Dll

Harga Satuan Dinas PU Manado 2016

Halaman 227 dari 266 halaman

NO

URAIAN PEKERJAAN

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Biaya Untuk 1 m2 Plamur permukaan gypsum 8

9

10

11

1 m²

1 m²

1 m²

1 m²

22,089.65

Cat dinding dalam & cat plafon (Cat Setara Dulux) Cat Tembok (Dulux/ICI setara) Ampelas Kuas

0.375 0.100 0.050

Kg Lbr Bh

250,000.00 5,000.00 20,000.00

93,750.00 500.00 1,000.00

Pekerja Tukang cat Kepala Tukang Mandor

0.080 0.120 0.012 0.012

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

8,000.00 15,000.00 1,800.00 1,440.00 121,490.00 12,149.00

Biaya Untuk 1 m2 Cat dinding dalam & cat plafon

133,639.00

Cat dinding luar & cat dinding / plafon KM (Cat Setara Dulux) Cat Tembok (Dulux/ICI setara) Cat Dasar /Alkali (Dulux/ Setara) Ampelas Kuas

0.375 0.150 0.100 0.050

Kg Kg Lbr Bh

250,000.00 135,000.00 5,000.00 20,000.00

93,750.00 20,250.00 500.00 1,000.00

Pekerja Tukang cat Kepala Tukang Mandor

0.080 0.120 0.012 0.012

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

8,000.00 15,000.00 1,800.00 1,440.00 141,740.00 14,174.00

Biaya Untuk 1 m2 Cat dinding luar & cat dinding / plafon KM

155,914.00

Cat dinding dalam & cat plafon (Cat Setara Metrolite/Catylac) Cat Tembok (Metrolite/ Catylac/ Setara) Ampelas Kuas

0.375 0.100 0.050

Kg Lbr Bh

108,000.00 5,000.00 20,000.00

40,500.00 500.00 1,000.00

Pekerja Tukang cat Kepala Tukang Mandor

0.080 0.120 0.012 0.012

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

8,000.00 15,000.00 1,800.00 1,440.00 68,240.00 6,824.00

Biaya Untuk 1 m2 Cat dinding dalam & cat plafon

75,064.00

Cat dinding luar & cat dinding / plafon KM (Cat Setara Metrolite/Catylac) Cat Tembok (Metrolite/ Catylac/ Setara) Cat Dasar /Alkali (Dulux/ Setara) Ampelas Kuas

0.375 0.150 0.100 0.050

Kg Kg Lbr Bh

108,000.00 135,000.00 5,000.00 20,000.00

40,500.00 20,250.00 500.00 1,000.00

Pekerja

0.080

Hari / Org

100,000.00

8,000.00

Harga Satuan Dinas PU Manado 2016

Halaman 228 dari 266 halaman

NO

URAIAN PEKERJAAN Tukang cat Kepala Tukang Mandor

12

13

14

1 m²

1 m²

1 m²

KOEFISIEN 0.120 0.012 0.012

SATUAN Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

15,000.00 1,800.00 1,440.00 88,490.00 8,849.00

Biaya Untuk 1 m2 Cat dinding luar & cat dinding / plafon KM

97,339.00

Cat tembok / plafon ( Rehab ) (Cat Setara Metrolite/Catylac) Cat Tembok (Metrolite/ Catylac/ Setara) Plamir Ampelas Kuas

0.273 0.025 0.100 0.050

Kg Kg Lbr Bh

108,000.00 50,000.00 5,000.00 20,000.00

29,520.00 1,250.00 500.00 1,000.00

Pekerja Tukang cat Kepala Tukang Mandor

0.080 0.120 0.012 0.080

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

8,000.00 15,000.00 1,800.00 9,600.00 66,670.00 6,667.00

Biaya Untuk 1 m2 Cat tembok / plafon ( Rehab )

73,337.00

Cat minyak ( Setara Glotex/ Seiv) Cat Kayu/Besi Mengkilap (Glotex/ Seiv/ Setara) Dempul Kayu/Wood Filler (Impra Setara) Ampelas Minyak Cat / Thiner Kuas

0.300 0.100 0.100 0.125 0.050

Kg Kg Lbr Ltr Bh

65,000.00 65,000.00 5,000.00 22,500.00 20,000.00

19,500.00 6,500.00 500.00 2,812.50 1,000.00

Pekerja Tukang cat Kepala Tukang Mandor

0.250 0.375 0.038 0.013

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

25,000.00 46,875.00 5,625.00 1,500.00 109,312.50 10,931.25

Biaya Untuk 1 m2 Cat minyak

120,243.75

Cat minyak (rehab) ( Setara Glotex/ Seiv) Cat Kayu/Besi Mengkilap (Glotex/ Seiv/ Setara) Dempul Kayu/Wood Filler (Impra Setara) Ampelas Minyak Cat / Thiner Kuas

0.200 0.040 0.100 0.070 0.050

Kg Kg Lbr Ltr Bh

65,000.00 65,000.00 5,000.00 22,500.00 20,000.00

13,000.00 2,600.00 500.00 1,575.00 1,000.00

Pekerja Tukang cat Kepala Tukang Mandor

0.110 0.180 0.018 0.009

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

11,000.00 22,500.00 2,700.00 1,080.00 55,955.00 5,595.50

Biaya Untuk 1 m2 Cat minyak

61,550.50

Harga Satuan Dinas PU Manado 2016

Halaman 229 dari 266 halaman

NO

15

URAIAN PEKERJAAN

1 m²

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Cat kayu woodstain Politur Dempul Kayu/Wood Filler (Impra Setara) Ampelas Minyak Cat / Thiner Kuas

0.250 0.100 0.100 0.125 0.050

Ltr Kg Lbr Ltr Bh

60,550.00 65,000.00 5,000.00 22,500.00 20,000.00

15,137.50 6,500.00 500.00 2,812.50 1,000.00

Kepala tukang Tukang Pekerja Mandor

0.035 0.350 0.175 0.009

Hari / Org Hari / Org Hari / Org Hari / Org

150,000.00 125,000.00 100,000.00 120,000.00

5,250.00 43,750.00 17,500.00 1,080.00 93,530.00 9,353.00

Over Head, Keuntungan, Dll Biaya Untuk 1 m2 kayu woodstain

16

17

18

1 m²

1 m²

1 m²

102,883.00

Pelaburan bidang kayu dengan politur Politur Minyak Cat / Thiner Kuas

0.250 0.125 0.050

Ltr Ltr Bh

60,550.00 22,500.00 20,000.00

15,137.50 2,812.50 1,000.00

Pekerja Tukang cat Kepala Tukang Mandor

0.060 0.120 0.035 0.009

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

6,000.00 15,000.00 5,250.00 1,080.00 46,280.00 4,628.00

Biaya Untuk 1 m2 pelaburan bidang kayu dengan politur

50,908.00

Pengecatan bidang kayu dengan cat residu dan ter Residu

0.350

Lt

38,395.00

13,438.25

Pekerja Tukang cat Kepala Tukang Mandor

0.100

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

10,000.00 720.00 24,158.25 2,415.83

Biaya Untuk 1 m2 pelaburan bidang kayu dengan cat residu

26,574.08

0.006

Pelaburan bidang kayu dengan vernis Teak oil Dempul Kayu/Wood Filler (Impra Setara) Ampelas Kuas

Harga Satuan Dinas PU Manado 2016

0.150 0.050 0.100 0.010

Ltr Kg Lbr Bh

60,000.00 65,000.00 5,000.00 20,000.00

9,000.00 3,250.00 500.00 200.00

Halaman 230 dari 266 halaman

NO

URAIAN PEKERJAAN

Pekerja Tukang cat Kepala Tukang Mandor

KOEFISIEN

Hari / Org Hari / Org Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

16,000.00 20,000.00 2,400.00 300.00 51,650.00 5,165.00

Biaya Untuk 1 m2 pelaburan bidang kayu dengan vernis

56,815.00

Harga Satuan Dinas PU Manado 2016

0.160 0.160 0.016 0.003

SATUAN

100,000.00 125,000.00 150,000.00 120,000.00

Halaman 231 dari 266 halaman

NO 19

20

21

22

URAIAN PEKERJAAN 1 m²

1 m²

1 m²

1 m²

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Pemasangan wall paper Wallpaper Lem vinyil

1.200 0.200

M² Kg

265,000.00 32,490.00

318,000.00 6,498.00

Pekerja Tukang cat Kepala Tukang Mandor

0.020 0.200 0.002 0.003

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

2,000.00 25,000.00 300.00 300.00 352,098.00 35,209.80

Biaya Untuk 1 m2 pemasangan wall paper

387,307.80

Pengecatan permukaan baja dengan meni besi Cat Menie Kayu/Besi/Seng (Glotex Setara) Kuas

0.100 0.010

Kg Bh

60,000.00 20,000.00

6,000.00 200.00

Pekerja Tukang cat Kepala Tukang Mandor

0.028 0.200 0.020 0.010

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

2,800.00 25,000.00 3,000.00 1,200.00 38,200.00 3,820.00

Biaya Untuk 1 m2pengecatan permukaan baja dengan meni besi

42,020.00

Pengecatan permukaan baja dengan meni besi dan perancah Cat Menie Kayu/Besi/Seng (Glotex Setara) Kuas Perancah kayu

0.100 0.010 0.002

Kg Bh M³

Pekerja Tukang cat Kepala Tukang Mandor

0.250 0.225 0.023 0.008

Hari / Org Hari / Org Hari / Org Hari / Org

60,000.00 20,000.00 2,200,000.00

6,000.00 200.00 4,400.00

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

25,000.00 28,125.00 3,375.00 900.00 62,000.00 6,200.00

Biaya Untuk 1 m2 pengecatan permukaan baja dengan meni besi dan perancah

68,200.00

Pengecatan permukaan baja lapis seng (galbani) secara manual sistem 4 lapis cat konvensional

Cat Menie Kayu/Besi/Seng (Glotex Setara)

0.300

Kg

60,000.00

18,000.00

Pekerja Tukang cat

0.006 0.060

Hari / Org Hari / Org

100,000.00 125,000.00

600.00 7,500.00

Harga Satuan Dinas PU Manado 2016

Halaman 232 dari 266 halaman

NO

URAIAN PEKERJAAN Kepala Tukang Mandor

KOEFISIEN

Hari / Org Hari / Org

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Over Head, Keuntungan, Dll

1,800.00 720.00 28,620.00 2,862.00

Biaya Untuk 1 m2

31,482.00

Harga Satuan Dinas PU Manado 2016

0.012 0.006

SATUAN

150,000.00 120,000.00

Halaman 233 dari 266 halaman

NO 23

24

URAIAN PEKERJAAN 1 m²

1 m²

KOEFISIEN

SATUAN

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

Pengecatan permukaan baja lapis seng (galbani) secara manual sistem 4 lapis cat mutakhir

Cat Menie Kayu/Besi/Seng (Glotex Setara)

0.300

Kg

60,000.00

18,000.00

Pekerja Tukang cat Kepala Tukang Mandor

0.006 0.060 0.012 0.006

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

600.00 7,500.00 1,800.00 720.00 28,620.00 2,862.00

Biaya Untuk 1 m2

31,482.00

Pengecatan permukaan baja lapis seng (galbani) secara semprot (airless spray) dengan sistem 1 lapis cat mutakhir dengan tebal 200 µm

Cat Menie Kayu/Besi/Seng (Glotex Setara)

0.300

Kg

60,000.00

18,000.00

Pekerja Tukang cat Kepala Tukang Mandor

0.012 0.120 0.024 0.012

Hari / Org Hari / Org Hari / Org Hari / Org

100,000.00 125,000.00 150,000.00 120,000.00

Over Head, Keuntungan, Dll

1,200.00 15,000.00 3,600.00 1,440.00 39,240.00 3,924.00

Biaya Untuk 1 m2

43,164.00

Catatan : - Sesuai harga yang berlaku dipasaran. - Harga satuan belum termasuk pajak yang berlaku. - Harga sewaktu-waktu bisa berubah

Menyetujui, Plt. KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

Dibuat Oleh, CV. DAYA ABADI GEMILANG

Ir. FERRY T. SIWI, M.Si NIP. 19590626 199103 1 008

ANNEKE I UNTU, ST Direktur

Harga Satuan Dinas PU Manado 2016

Halaman 234 dari 266 halaman

Daftar Besi (Baja) Polos Beton ( Hasil Survey Desember 2009 )

Diameter (mm)

Berat per m' **(kg/m')

Panjang di pasaran ( m' )

Berat Total (kg)

Harga di pasaran (Rp.)

Harga per Kg. (Rp.)

Ket.

BESI BETON POLOS 6

0.220

11.5

2.5300

SII

6

0.220

11.9

2.6180

8

0.393

11.5

4.5195

SII

8

0.393

12.0

4.7160

SNI

10

0.620

11.5

7.1300

SII

10

0.620

12.0

7.4400

12

0.887

11.5

10.2005

12

0.887

12.0

10.6440

14

1.209

11.5

13.9035

14

1.209

12.0

14.5080

16

1.580

12.0

18.9600

16

1.580

12.0

18.9600

30,000.00

65,000.00

11,459.13

8,736.56

SNI

SNI SII

105,000.00

9,864.71

SNI SII

135,000.00

9,305.21

SNI SII

175,000.00

Harga Tertinggi

9,229.96

SNI

11,459.13

BESI BETON ULIR 14

1.209

12.0

14.5080

14

1.209

12.0

14.5080

16

1.580

12.0

18.9600

16

1.580

12.0

18.9600

19

1.994

12.0

23.9280

19

1.994

12.0

23.9280

20

2.465

12.0

29.5800

SNI

20

2.465

12.0

29.5800 Tdk Ada Data

SNI

22

2.980

12.0

35.7600

SNI

22

2.980

12.0

35.7600

25

3.850

12.0

46.2000

SNI

25

3.850

12.0

46.2000 Tdk Ada Data

SNI

Harga Rata rata

SNI 135,000.00

9,305.21

SNI SNI

175,000.00

9,229.96

SNI SNI

237,000.00

331,250.00

9,904.71

9,263.14

9,904.71

SNI

SNI

** Sumber : Buku Teknik Sipil, hal. 352

TIM PENYUSUN BASIC PRICE DAN UNIT PRICE T.A. 2010

LAMPIRAN KEPUTU Nomor Tanggal Tentang

DAFTAR HARGA SATUAN JADI PRASARANA PERUMAHAN DAN PERMUKIMAN TAHUN ANGGARAN 2015

NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

SATUAN JADI 2016

Halaman 237 dari 266 halaman

NO. 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73

SATUAN JADI 2016

Halaman 238 dari 266 halaman

NO. 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117

SATUAN JADI 2016

Halaman 239 dari 266 halaman

NO. 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161

SATUAN JADI 2016

Halaman 240 dari 266 halaman

NO. 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205

SATUAN JADI 2016

Halaman 241 dari 266 halaman

NO. 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249

SATUAN JADI 2016

Halaman 242 dari 266 halaman

NO. 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293

SATUAN JADI 2016

Halaman 243 dari 266 halaman

NO. 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337

SATUAN JADI 2016

Halaman 244 dari 266 halaman

NO. 338 339 340 341

Catatan : - Sesuai harga yang berlaku dipasaran. - Harga satuan belum termasuk pajak yang berlaku. - Harga sewaktu-waktu bisa berubah

SATUAN JADI 2016

Halaman 245 dari 266 halaman

LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANAD : : : Penetapan Standardisasi Harga Satuan Jadi di lingkungan Dinas Pekerjaan Umum Kota Manado 2016 DAFTAR HARGA SATUAN JADI PRASARANA PERUMAHAN DAN PERMUKIMAN TAHUN ANGGARAN 2015

URAIAN PEKERJAAN Pagar sementara dari kayu tinggi 2 meter Pagar sementara dari seng gelombang tinggi 2 meter Pagar sementara dari kawat duri tinggi 1.8 meter Pengukuran dan Pemasangan Bouwplank Pembuatan kantor sementara, dengan lantai plesteran Pembuatan gudang semen dan alat-alat Pembuatan rumah jaga/konstruksi kayu Membersihkan lapangan dan perataan Pembuatan bedeng buruh Pembuatan bak adukan ukuran (40 x 50 x 20) cm Pembuatan Stegger dari bambu, ukuran (40 x 50 x 20) cm Pembuatan jalan sementara Bongkaran beton bertulang Bongkaran dinding tembok bata merah Pasang pagar kawat jaring galvanis, tinggi 1.00 m Galian tanah biasa sedalam 1 meter Galian tanah biasa sedalam 2 meter Galian tanah biasa sedalam 3 meter Galian tanah keras sedalam 1 meter Galian tanah cadas sedalam 1 meter Galian tanah lumpur sedalam 1 meter Pekerjaan stripping setinggi 1 meter Pembuangan tanah sejauh 30 meter Urugan kembali Pemadatan tanah (per 20 cm) Timbunan tanah dan pemadatan ( manual ) Urugan pasir Lapisan pudel campuran 1 Kp : 3 Ps : 7 TL Lapisan pudel campuran 1 Kp : 5 TL

SATUAN JADI 2016

Halaman 246 dari 266 halaman

URAIAN PEKERJAAN Pemasangan lapisan ijuk Urugan sirtu Pembuatan jalan sementara, tebal 25 cm Pasang pondasi batu kali, 1 Pc : 3 Ps Pasang pondasi batu kali, 1 Pc : 4 Ps Pasang pondasi batu kali, 1 Pc : 5 Ps Pasang pondasi batu kali, 1 Pc : 6 Ps Pasang pondasi batu kali, 1 Pc : 8 Ps Pasang pondasi batu kali, 1 Kp : 1 Sm : 2 Ps Pasang pondasi batu kali, 1 Pc : 1/4 Kp : 4 Ps Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps Pasang pondasi batu kali, 1/4 Pc : 1 Kp : 4 Ps Pasang pondasi batu kosong Pasang pond. siklop, 60 % beton campuran 1PC : 2 PB : 3 Kr dan 40% batu belah Pasang pondasi sumuran diameter 100 cm Pembuatan tiang pancang (40 x 40) cm, beton bertulang Pembuatan tiang pancang (35 x 35) cm, beton bertulang Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps Plesteran 1 Pc : 1 Ps, tebal 15 mm Plesteran 1 Pc : 2 Ps, tebal 15 mm Plesteran 1 Pc : 3 Ps, tebal 15 mm Plesteran 1 Pc : 4 Ps, tebal 15 mm Plesteran 1 Pc : 5 Ps, tebal 15 mm Plesteran 1 Pc : 6 Ps, tebal 15 mm Plesteran 1 Pc : 2 Ps ; tebal 20 mm Plesteran 1 Pc : 3 Ps ; tebal 20 mm Plesteran 1 Pc : 4 Ps ; tebal 20 mm Plesteran 1 Pc : 5 Ps ; tebal 20 mm Plesteran Skoning 1 PC : 2 PP, lebar 10 mm Plesteran siar timbul adukan 1 Pc : 2 Ps

SATUAN JADI 2016

Halaman 247 dari 266 halaman

URAIAN PEKERJAAN Acian Acian Untuk Saluran Membuat dan memasang kosen pintu, jendela, ventilasi, kayu Kls.I Membuat dan memasang kosen pintu, jendela, ventilasi, kayu Kls.II Mermbuat dan memasang Pintu klamp standar, rangka kayu kelas II Mermbuat dan memasang Pintu klamp sederhana, rangka kayu kelas III Membuat dan memasang pintu panel kayu kelas I Membuat dan memasang pintu panel kayu kelas II Membuat dan memasang pintu dan jendela kaca kayu kelas I Membuat dan memasang pintu dan jendela kaca kayu kelas II Membuat dan memasang pintu dan jendela jalusi kayu kayu kelas I Membuat dan memasang pintu dan jendela jalusi kayu kayu kelas II Pasang pintu plywood rangkap,rangka kayu kelas I (lebar sampai 90 cm) Memasang jalusi kusen, kayu kelas I Memasang jalusi kusen, kayu kelas II Pasang pintu plywood rangkap, rangka kayu kelas II (lebar sampai 90 cm) Pasang pintu plywood rangkap, rangka expose kayu kelas I Pasang pintu plywood rangkap, rangka expose kayu kelas II Pasang pintu teakwood rangkap, rangka kayu kelas I Pasang pintu teakwood rangkap, rangka kayu kelas II Pasang pintu teakwood rangkap, rangka expose kayu kelas I Pasang pintu teakwood rangkap, rangka expose kayu kelas II Pasang pintu teakwood rangkap & formika rangka expose kayu kelas I Pasang pintu teakwood rangkap & formika rangka expose kayu kelas II Pasang konstruksi kuda-kuda kayu jati Pasang konstruksi kuda-kuda kayu kelas I Pasang konstruksi kuda-kuda kayu kelas II Pasang konstruksi kuda-kuda kayu kelas III Pasang kaso + reng genteng kodok kayu kelas I Pasang kaso + reng genteng kodok kayu kelas II Pasang kaso + reng genteng monier kayu jati Pasang kaso + reng genteng monier kayu kelas I Pasang kaso + reng genteng beton kayu kelas II Pasang kaso + reng atap sirap kayu kelas I Pasang kaso + reng atap sirap kayu kelas II Pasang rangka langit-langit (1,00 x 1,00) m, kayu jati Pasang rangka langit-langit (1,00 x 1,00) m, kayu kelas I Pasang rangka langit-langit (1,00 x 1,00) m, kayu kelas II Pasang rangka langit-langit (30 x 60) cm, kayu jati Pasang Rangka langit-langit 50 x 100 cm, kayu kelas II Pasang Rangka langit-langit 50 x 100 cm, kayu kelas III Pasang Rangka plafon 60 x 60 cm, kayu kls II Pasang Rangka plafon 60 x 60 cm, kayu kls III Pasang rangka langit-langit (30 x 30) cm, kayu kelas II

SATUAN JADI 2016

Halaman 248 dari 266 halaman

URAIAN PEKERJAAN Pasang lisplang ukuran (3 x 20) cm, kayu kelas I Pasang lisplang ukuran (3 x 20) cm, kayu kelas II Pasang lisplang ukuran (3 x 30) cm, kayu kelas I Pasang lisplang ukuran (3 x 30) cm, kayu kelas II Pasang lisplang ukuran 2 x (3 x 20) cm, kayu kelas I Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kelas I Pasang lisplang ukuran 2 x (2 x 20) cm, kayu kelas II Pasang Rangka dinding pemisah (60x120) cm kayu kls. I Pasang Rangka dinding pemisah (60x120) cm kayu kls. II Pasang Rangka dinding pemisah (60x120) cm kayu kls. III Pasang dinding pemisah teakwood rangkap, rangka kayu kelas I Pasang dinding pemisah teakwood rangkap, rangka kayu kelas II Pasang dinding pemisah plywood rangkap, rangka kayu kelas I Pasang dinding pemisah plywood rangkap, rangka kayu kelas II Pasang Dinding pemisah gypsum rangkap, rangka kayu kls. II Pasang Dinding lambrisering dari papan kayu kls. II Pasang list plafond kayu profil 3/8 Beton mutu f'c = 7,4 Mpa (K 100), slump (12 +/ 2) cm, w/c 0,87 Beton mutu f'c = 9,8 Mpa (K 125), slump (12 +/ 2) cm, w/c 0,78 Beton mutu f'c = 12,2 Mpa (K 150), slump (12 +/ 2) cm, w/c 0,72 Lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,87 Beton mutu f'c = 14,5 Mpa (K 175), slump (12 +/ 2) cm, w/c 0,66 Beton mutu f'c = 16,9 Mpa (K 200), slump (12 +/ 2) cm, w/c 0,61r Beton mutu f'c = 19,3 Mpa (K 225), slump (12 +/ 2) cm, w/c 0,58 Beton mutu f'c = 21,7 Mpa (K 250), slump (12 +/ 2) cm, w/c 0,56 Beton mutu f'c = 24 Mpa (K 275), slump (12 +/ 2) cm, w/c 0,53 Beton mutu f'c = 26,4 Mpa (K 300), slump (12 +/ 2) cm, w/c 0,52 Beton mutu f'c = 28,8 Mpa (K 325), slump (12 +/ 2) cm, w/c 0,49 Beton mutu f'c = 31,2 Mpa (K 350), slump (12 +/ 2) cm, w/c 0,48 Beton kedap air dengan storox-100 Pembesian dengan besi polos atau besi ulir Memasang jaring kawat/wiremesh θ 6 Memasang jaring kawat/wiremesh θ 8 Memasang jaring kawat/wiremesh θ 10 Pasang bekisting untuk pondasi Pasang bekisting untuk sloof Pasang bekisting untuk kolom Pasang bekisting untuk balok Pasang bekisting untuk lantai Pasang bekisting untuk tangga Jembatan untuk pengecoran beton Membuat pondasi beton bertulang (150 kg besi + bekisting) Membuat sloof beton bertulang (200 kg besi + bekisting) Membuat kolom beton bertulang (300 kg besi + bekisting)

SATUAN JADI 2016

Halaman 249 dari 266 halaman

URAIAN PEKERJAAN Membuat balok beton bertulang (200 kg besi + bekisting) Membuat Kolom beton bertulang (150 kg besi+bekisting) Membuat dinding beton bertulang (150 kg besi + bekisting) Membuat tangga beton bertulang (200 kg besi + bekisting) Membuat Kolom praktis beton bertulang (11x11) cm Membuat ring balok beton bertulang (10 x 15) cm Pasang atap genteng kodok/glazzur Pasang atap asbes gelombang Besar Pasang atap asbes gelombang Kecil Pasang atap genteng beton Pasang atap genteng metal (setara multiroof) Pasang atap sirap Pasang nok genteng beton Pasang atap genteng aspal Pasang nok sirap Pasang atap seng gelombang Pasang atap nok seng Pasang alumunium foil/sisalation Langit-langit plywood (30 x 60) cm, tebal 4 mm Langit-langit plywood (30 x 60) cm, tebal 6 mm Langit-langit plywood (60 x 120) cm, tebal 4 mm Langit-langit plywood (60 x 120) cm, tebal 6 mm Langit-langit teakwood (30 x 60) cm, tebal 4 mm Langit-langit teakwood (60 x 120) cm, tebal 4 mm Langit-langit lat kayu jati Langit-langit softboard List langit-langit kayu profil Langit-langit asbes (1,00 x 1,00) m, tebal 3,2 mm rangka kayu kelas III Memasang kloset duduk/monoblok Memasang kloset jongkok porselen Memasang urinoir Memasang wastafel Memasang bak mandi Fibreglass volume 0,30 M3 Memasang bak mandi batu bata volume 0,30 M3 Membuat bak fiberglass volume 1 M3 air Memasang bak kontrol pasangan batu bata ukuran (30x30) cm, tinggi 35 cm Memasang bak kontrol pasangan batu bata ukuran (45x45) cm, tinggi 50 cm Memasang pipa galvanis (Medium A), diameter 1/2" Memasang pipa galvanis (Medium A), diameter 3/4" Memasang pipa galvanis (Medium A), diameter 1" Memasang pipa galvanis (Medium A), diameter 2" Memasang pipa galvanis (Medium A), diameter 3" Memasang pipa PVC dia. 4" AW Memasang pipa PVC dia. 3" AW

SATUAN JADI 2016

Halaman 250 dari 266 halaman

URAIAN PEKERJAAN Memasang pipa PVC dia.2" AW Memasang pipa PVC dia. 1.5" AW Memasang pipa PVC dia. 1" AW Memasang pipa PVC dia. 3/4" AW Memasang pipa PVC Dia. 1/2" AW Memasang kran diameter 3/4" atau 1/2" Memasang floor drain Besi profil Pasang rangka kuda-kuda baja IWF Pekerjaan perakitan Pintu besi plat baja tebal 2mm rangkap, rangka baja siku Pengelasan dengan las listrik Pasang jendela besi Pasang jendela besi tahan api Pasang pintu gulung besi Pasang pintu lipat Pasang pintu Sunscreen alumunium Pasang Rolling door Pasang pintu alumunium Pasang venetions blinds Pasang Venetion blinds Pasang trali besi Pasang kawat harmonika Pasang kawat nyamuk Pasang kawat kassa Pasang kawat burung Pasang jendela nako & tralis Pasang talang datar, seng bjls 25 Pasang talang miring, seng bjls 25 Pasang talang 1/2 lingkaran D -10 cm, seng bjls 25 Pasang talang 1/2 lingkaran D -10 cm, seng bjls 24 Pasang kunci tanam biasa Pasang kunci tanam kamar mandi Pasang kunci silinder Pasang engsel pintu Pasang engsel jendela kupu-kupu Pasang engsel angin Pasang kait angin Pasang door closer Pasang kunci selot Pasang pegangan pintu / door holder Pasang door stop Pasang rel pintu dorong Pasang kunci lemari

SATUAN JADI 2016

Halaman 251 dari 266 halaman

URAIAN PEKERJAAN Pasang kaca, tebal 3 mm Pasang kaca, tebal 5 mm Pasang kaca, tebal 8 mm Pasang kaca buram, tebal 12 mm Pasang kaca cermin, tebal 5 mm Pasang kaca cermin, tebal 8 mm Pasang kaca cermin, tebal 8 mm Pasang kaca "wireglass, tebal 5 mm Pasang kaca patri, tebal 5 mm Pasang lantai ubin pc abu-abu ukuran 40 x 40 cm Pasang lantai ubin pc abu-abu ukuran 30 x 30 cm Pasang lantai ubin pc abu-abu ukuran 20 x 20 cm Pasang lantai ubin warna ukuran 40 x 40 cm Pasang lantai ubin warna ukuran 30 x 30 cm Pasang lantai ubin warna ukuran 20 x 20 cm Pasang lantai granito warna ukuran 40 x 40 cm Pasang lantai granito warna ukuran 30 x 30 cm Pasang lantai teralus kerang ukuran 40 x 40 cm Pasang lantai ubin teralux kerang ukuran 30 x 30 cm Pasang lantai ubin teralux marmer ukuran 60 x 60 cm Pasang lantai ubin teralux marmer ukuran 40 x 40 cm Pasang plint ubin pc abuabu ukuran 15 x 30 cm Pasang plint ubin pc abu-abu ukuran 10 x 30 cm Pasang plint ubin pc abu-abu ukuran 10 x 40 cm Pasang plint ubin pc warna ukuran 10 x 20 cm Pasang plint ubin pc warna ukuran 10 x 40 cm Pasang plint ubin granito ukuran 10 x 40 cm Pasang plint ubin granito ukuran 10 x 30 cm Pasang plint ubin teralux kerang ukuran 10 x 40 cm Pasang plint ubin teralux kerang ukuran 10 x 30 cm Pasang plint ubin teralux marmer ukuran 10 x 60 cm Pasang plint ubin teralux marmer ukuran 10 x 40 cm Pasang plint ubin teralux marmer ukuran 10 x 30 cm Pasang lantai keramik artistik 10 x 20 cm Pasang lantai keramik artistik 10 x 10 cm Pasang lantai keramik artistik 5 x 20 cm Pasang plint keramik artistik 10 x 20 cm Pasang plint keramik artistik 10 x 10 cm Internal cove artistik (5x5x 20) cm Pasang plint vinyil tanpa adukan Pasang lantai keramik 15 x 15 cm Pasang lantai keramik 20 x 20 cm Pasang lantai keramik 25 x 25 cm Pasang lantai keramik 15 x 20 cm

SATUAN JADI 2016

Halaman 252 dari 266 halaman

URAIAN PEKERJAAN Pasang lantai mosaik 30 x 30 cm, ex lokal Pasang lantai marmer Pasang lantai karpet 100% wool Pasang lantai karpet 80% wool, 20% nylon Pasang underlyer, tebal 6 mm Pasang lantai karpet Pasang lantai parquet jati Pasang gymfloor Pasang dinding porselin 11 x 11 cm, putih Pasang dinding keramik artistik 10 x 20 cm Pasang dinding keramik artistik 5 x 20 cm Pasang dinding keramik 10 x 20 cm Pasang dinding keramik 15 x 15 cm Pasang dinding keramik 20 x 20 cm Pasang dinding keramik 10 x 20 cm Pasang dinding marmer Pasang dinding bata pelapis 7x3x24 cm Pasang dinding bata klinker 5x5x25 cm Pasang lantai vinyl karet 30 x 30 cm KL I Pasang lantai vinyl karet 30 x 30 cm KL II Pasang lantai vinyl asbes 30 x 30 cm Pasang lantai vinyl motif kembang 30 x 30 cm Pasang wall covering lebar 50 cm Floor hardener ferrovax Mengikis/mengerok permukaan cat tembok lama Mencuci bidang permukaan tembok yang pernah di cat Mengerok karat cat lama permukaan baja dengan cara manual Menyabun permukaan tembok lama Mendempul dan menggosok kayu Plamur Plamur permukaan gypsum Cat dinding dalam & cat plafon (Cat Setara Dulux) Cat dinding luar & cat dinding / plafon KM (Cat Setara Dulux) Cat dinding dalam & cat plafon (Cat Setara Metrolite/Catylac) Cat dinding luar & cat dinding / plafon KM (Cat Setara Metrolite/Catylac) Cat tembok / plafon ( Rehab ) (Cat Setara Metrolite/Catylac) Cat minyak ( Setara Glotex/ Seiv) Cat minyak (rehab) ( Setara Glotex/ Seiv) Cat kayu woodstain Pelaburan bidang kayu dengan politur Pengecatan bidang kayu dengan cat residu dan ter Pelaburan bidang kayu dengan vernis Pemasangan wall paper Pengecatan permukaan baja dengan meni besi

SATUAN JADI 2016

Halaman 253 dari 266 halaman

URAIAN PEKERJAAN Pengecatan permukaan baja dengan meni besi dan perancah Pengecatan permukaan baja lapis seng (galbani) secara manual sistem 4 lapis cat konvensional Pengecatan permukaan baja lapis seng (galbani) secara manual sistem 4 lapis cat mutakhir Pengecatan permukaan baja lapis seng (galbani) secara semprot (airless spray) dengan sistem 1 lapis cat mutakhir dengan tebal 200 µm

- Sesuai harga yang berlaku dipasaran. - Harga satuan belum termasuk pajak yang berlaku. - Harga sewaktu-waktu bisa berubah Menyetujui, Plt. KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

Ir. FERRY T. SIWI, M.Si NIP. 19590626 199103 1 008

SATUAN JADI 2016

Halaman 254 dari 266 halaman

A DINAS PEKERJAAN UMUM KOTA MANADO

SATUAN 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m³ 1 m³ 1 m¹ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m² 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³

SATUAN JADI 2016

HARGA (Rp.)

KETERANGAN

480,813.38 579,419.58 741,446.84 106,249.00 5,331,181.76 1,610,307.04 1,850,706.00 17,600.00 1,591,198.18 252,054.00 68,755.50 204,546.32 777,326.00 777,326.00 35,189.00 85,800.00 104,940.00 124,344.00 114,224.00 172,920.00 137,940.00 6,160.00 37,620.00 28,600.00 61,600.00 132,963.60 304,920.00 319,804.91 285,259.70

Halaman 255 dari 266 halaman

SATUAN 1 m³ 1 m³ 1 m² 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m¹ 1 m¹ 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m²

SATUAN JADI 2016

HARGA (Rp.)

KETERANGAN

323,400.00 230,694.20 217,833.50 1,028,471.90 984,026.92 953,191.14 882,023.75 845,702.47 703,694.64 951,741.58 823,697.04 800,327.37 591,692.64 2,747,544.75 1,050,025.43 1,168,566.78 921,935.91 562,869.90 551,286.31 295,419.23 291,923.33 286,811.89 279,692.87 153,199.89 147,375.29 144,226.29 142,257.34 141,504.54 139,248.82 140,504.97 126,126.40 127,853.09 84,326.98 78,098.05 75,538.57 73,679.59 72,777.93 71,991.82 107,130.32 99,889.68 98,503.45 97,396.82 75,354.50 70,378.05

Halaman 256 dari 266 halaman

SATUAN 1 m² 1 m² 1 m³ 1 m³ 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m³ 1 m³ 1 m³ 1 m³ 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m²

SATUAN JADI 2016

HARGA (Rp.)

KETERANGAN

43,260.16 22,346.46 16,233,387.50 12,794,787.50 511,923.50 401,923.50 1,043,350.00 911,350.00 741,730.00 662,530.00 1,307,350.00 1,096,150.00 777,078.50 1,089,962.50 891,962.50 694,578.50 815,138.50 757,058.50 826,578.50 744,078.50 874,538.50 792,038.50 944,768.00 862,268.00 16,089,920.00 16,089,920.00 12,459,920.00 9,434,920.00 163,102.50 123,502.50 185,102.50 185,102.50 138,902.50 1,852,862.00 1,308,362.00 199,595.00 199,595.00 159,995.00 326,562.50 196,570.00 154,220.00 201,767.50 156,942.50 296,340.00

Halaman 257 dari 266 halaman

SATUAN 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m¹ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 Kg 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m³ 1 m³ 1 m³

SATUAN JADI 2016

HARGA (Rp.)

KETERANGAN

163,955.00 128,315.00 164,807.50 128,507.50 226,017.00 129,217.00 102,377.00 398,898.50 306,498.50 229,498.50 539,522.50 447,122.50 516,972.50 424,572.50 406,114.50 413,655.00 25,872.00 1,054,465.65 1,094,361.44 1,121,879.78 980,756.15 1,154,797.14 1,185,709.48 1,209,742.64 1,224,549.14 1,255,282.53 1,258,026.59 1,351,981.56 1,362,345.95 1,320,200.23 15,810.30 172,392.00 199,012.00 232,892.00 308,122.10 332,872.10 501,855.20 516,705.20 566,843.20 451,672.65 180,229.50 5,059,175.83 6,252,172.03 10,270,388.43

Halaman 258 dari 266 halaman

SATUAN 1 m³ 1 m³ 1 m³ 1 m³ 1 m¹ 1 m¹ 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m¹ 1 m¹ 1 m¹ 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m¹ 1 m² 1 Bh 1 Bh 1 Bh 1 Bh 1 Bh 1 Bh 1 Bh 1 Bh 1 Bh 1 M¹ 1 M¹ 1 M¹ 1 M¹ 1 M¹ 1 M¹ 1 M¹

SATUAN JADI 2016

HARGA (Rp.)

KETERANGAN

8,040,860.03 7,083,860.03 6,903,892.33 7,334,270.63 90,731.56 128,597.03 1,166,176.00 53,773.50 53,373.10 458,793.50 269,811.74 452,936.00 392,991.94 253,632.50 74,217.00 52,492.00 51,392.00 192,731.00 50,110.50 55,258.50 51,183.00 56,545.50 50,110.50 51,183.00 409,689.50 109,891.38 32,015.50 117,260.00 1,910,755.00 596,119.54 2,030,525.04 1,165,809.70 1,308,340.00 2,023,897.70 1,851,520.00 638,499.62 449,888.86 188,584.00 221,584.00 287,584.00 535,532.80 865,532.80 102,427.60 68,767.60

Halaman 259 dari 266 halaman

SATUAN 1 M¹ 1 M¹ 1 M¹ 1 M¹ 1 M¹ 1 Bh 1 Bh 1 Kg 1 Kg 100 Kg 1 m² 100 cm 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 Bh 1 Bh 1 Bh 1 Bh 1 Bh 1 Bh 1 Bh 1 Bh 1 Bh 1 Bh 1 Bh 1 Bh 1 Bh

SATUAN JADI 2016

HARGA (Rp.)

KETERANGAN

41,707.60 36,757.60 33,081.40 22,831.60 20,769.10 172,262.06 61,160.00 152,499.60 152,499.60 36,685.00 5,186,980.15 24,455.20 1,252,427.00 1,467,449.50 1,292,126.00 1,252,420.40 294,948.50 2,540,967.00 1,220,091.40 170,593.50 170,593.50 1,467,919.20 80,587.10 80,587.10 66,176.00 60,948.80 628,518.00 176,239.25 212,319.25 205,535.00 223,355.00 208,560.00 206,855.00 196,658.00 85,349.00 70,466.00 67,320.00 47,088.80 536,030.00 71,632.00 316,580.00 140,316.00 268,317.50 57,915.00

Halaman 260 dari 266 halaman

SATUAN 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m² 1 m² 1 m² 1 m¹ 1 m¹ 1 m¹ 1 m¹ 1 m² 1 m² 1 m² 1 m²

SATUAN JADI 2016

HARGA (Rp.)

KETERANGAN

176,099.00 241,469.25 256,020.60 46,751.10 253,539.00 310,711.50 313,193.10 239,248.90 453,642.75 176,880.89 164,661.28 142,776.91 189,956.91 180,520.80 154,016.59 620,915.69 3,657,131.28 776,193.09 516,777.31 691,439.75 524,889.84 15,856.46 14,516.99 13,564.94 32,528.07 25,609.56 132,758.25 248,017.99 218,906.27 252,340.33 201,051.62 241,226.09 269,648.00 631,720.89 639,893.89 632,270.89 74,586.27 74,946.19 222,632.10 388,332.12 279,720.89 259,370.89 259,590.89 263,630.91

Halaman 261 dari 266 halaman

SATUAN 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m² 1 m²

SATUAN JADI 2016

HARGA (Rp.)

KETERANGAN

920,196.75 1,981,163.19 283,625.93 167,658.15 264,413.33 147,191.55 555,383.40 543,833.40 286,460.20 635,132.70 635,682.70 262,782.70 285,470.20 214,657.70 212,732.70 2,047,436.59 233,107.59 359,222.59 1,201,746.15 1,273,521.43 232,628.00 304,464.05 261,668.00 139,689.00 17,580.75 17,804.60 17,804.60 17,804.60 17,182.99 18,925.50 22,089.65 133,639.00 155,914.00 75,064.00 97,339.00 73,337.00 120,243.75 61,550.50 102,883.00 50,908.00 26,574.08 56,815.00 387,307.80 42,020.00

Halaman 262 dari 266 halaman

SATUAN

HARGA (Rp.)

1 m² 1 m²

68,200.00 31,482.00

1 m²

31,482.00

1 m²

43,164.00

KETERANGAN

Dibuat Oleh, CV. DAYA ABADI GEMILANG

ANNEKE I UNTU, ST Direktur

SATUAN JADI 2016

Halaman 263 dari 266 halaman

LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANADO Nomor : Tanggal : Tentang : Penetapan Standardisasi Harga Satuan Jadi di lingkungan Dinas Pekerjaan Umum Kota Manado 2014

DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA Asphalt Mixing Plant (AMP) URAIAN

No.

BIAYA KO DE

HP

KAP.

SEWA

KET.

ALAT/JAM (di luar PPN)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 52 54

ASPHALT MIXING PLANT (AMP) ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M³ CRANE 10-15 TON DUMP TRUCK 3.5 TON DUMP TRUCK 10 TON EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M³ GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M³ THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 MM WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER ASPHALT LIQUID MIXER TRONTON COLD MILLING ROCK DRILL BREAKER COLD RECYCLER HOT RECYCLER AGGREGAT (CHIP) SPREADER ASPHALT DISTRIBUTOR SLIP FORM PAVER CONCRETE PAN MIXER CONCRETE BREAKER ASPAHLT TANKER CEMENT TANKER CONDRETE MIXER (350) VIBRATING RAMMER TRUK MIXER (AGITATOR) BORE PILE MACHINE CRANE ON TRACK 75-100 TON BLENDING EQUIPMENT CHAINSAW

E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E34a E35 E36 E37 E38 E39 E40 E41 E42 E43 E44 E45 E46 E47 E48 E49 E50 E51 E52

294 72.4 4 155 60 20 138 100 190 133 190 180 135 70 96 55 82 100.5 82 5.5 220 6 100 8.8 4.7 0 345 100 175 25 125 40 150 5

40 150 248 3 900 400 115 115 105 134 290 190 190 20 4.2 220 125 200 50

60 T/Jam 10 Ton 850 Liter 100-150 HP 5000 CPM/(L/m) 500 Liter 15 Ton 3.5 Ton 10 Ton 0.93 M3 10 ton 135 KVA ˃100 HP 0.8 M3 1.5 M3 8 Ton 8.1 Ton 9 Ton 7.05 Ton 25 50 T/Jam 100 Mm 4000 Liter 835 Ton 121 Ton 1330 PSI 2005 M3 8 M3 20 Ton 2.5 Ton 35 Ton 250 Amp 2000 Meter 1000 Liter 20000 Liter 15 Ton -1000 m 2.2 M 3M 3.5 M 4000 Liter 2.5 M 600 Liter 20 m3/jam 4000 liter 4000 liter 350 liter 80 KG 5 M3 60 CM 75 Ton 30 Ton Jam

7,656,292.06 953,281.19 63,294.54 565,366.32 177,461.87 172,931.63 668,999.46 264,243.51 511,105.58 507,078.47 504,177.68 453,703.02 470,016.25 301,059.08 361,144.63 223,852.37 481,411.34 450,358.94 415,777.20 41,243.23 739,364.13 38,924.42 254,384.67 88,711.76 46,308.72 33,053.99 1,416,062.84 260,646.68 526,700.92 285,105.39 476,465.07 113,311.08 838,763.52 39,226.23 113,084.17 565,065.57 312,458.83 1,742,321.22 6,571,462.09 7,829,602.48 561,732.47 382,142.54 562,968.78 681,704.31 871,246.96 580,772.52 536,244.12 80,424.73 46,657.97 666,942.55 686,218.26 660,326.53 237,293.05

T x Te1 x Te2 x Fa

42500

E05

E06 Catatan : -

T x Te1 x Te2 x Fa BIAYA SEWA PERALATAN PER JAM dilakukan berdasarkan ANALISA BAYA PERALATAN PAHS Bina Marga menggunakan baberapa asumsi ( Jam kerja efektif 8 jam, Asuransi / pajak peralatan, Tingkat suku bunga ).

-

BIAYA SEWA PERALATAN PER JAM sudah termasuk biaya pengembalian modal, biaya asuransi, biaya operasional seperti bahan bakar pelumas, perbaikan dan perawatan.

-

BIAYA SEWA PERALATAN belum termasuk biaya K3

-

BIAYA SEWA PERALATAN belum termasuk pajak.

Menyetujui, KEPALA DINAS PEKERJAAN UMUM KOTA MANADO

KONSULTAN PT. MEDALION ESA PERKASINDO

Ir. FERRY T. SIWI, MT NIP. 19590626 199103 1 008

MEITA M. M. TUMEWU, ST Direktur

ukuran tegel s s 0.25 0.4 0.3 0.25 0.2 0.15 0.1

jlh 0.25 0.4 0.3 0.25 0.2 0.15 0.1

0.0625 16 0.16 6.25 0.09 11.111111 0.0625 16 0.04 25 0.0225 44.444444 0.01 100

harga dos 16 75000 6 75000 11 75000 16 75000 25 75000 44 75000 100 75000

harga buah 4,687.50 12,500.00 6,818.18 4,687.50 3,000.00 1,704.55 750.00

4,688.00 12,500.00 6,818.00 4,688.00 3,000.00 1,705.00 750.00

Related Documents

Sda
June 2020 21
Ahs
June 2020 30
Sda
May 2020 19
Ck
December 2019 53
Ck
November 2019 32

More Documents from ""

Jalan Raya
October 2019 62
Desain Struktur
October 2019 39
Sbbk Hampangen 2019.docx
November 2019 32
Proposal Paskah.docx
November 2019 28