Jadwal Lpse.xlsx

  • Uploaded by: NASRUL HADI
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Jadwal Lpse.xlsx as PDF for free.

More details

  • Words: 1,507
  • Pages: 16
No

PEKERJAAN

LPSE PROV KALTIM 1

Perencanaan Pembangunan Gedung Rektorat Universitas Nahdlotul Ulama Prov. Kaltim Seleksi spse 4.3

2

Pengawasan (supervisi) Lanjutan Pembangunan Pastoran Paroki St. Maria Katedral Pembantu Senantiasa Samarinda Seleksi spse 4.3

3

Review Design Pembangunan Gedung Pemerintah Jalan PM Noor di Samarinda Seleksi spse 4.3

4

Perencanaan Pembangunan Gedung Lamin Adat Dayak Seleksi spse 4.3

5

Perencanaan Teknis Asrama Mahasiswa Kaltim Seleksi spse 4.3

6

Perencanaan Pembangunan Gedung Pemerintah Jalan Kesuma Bangsa di Samarinda Seleksi spse 4.3

7

Perencanaan Pembangunan Gedung Kejaksaan Tinggi Prov. Kaltim Seleksi spse 4.3

HPS

No

PEKERJAAN

8

Pengawasan (Supervisi) Lanjutan Pembangunan Kantor Penghubung Kaltim di Jakarta Seleksi spse 4.3

9

Perencanaan Rumah Jabatan Gubernur dan Wakil Gubernur Seleksi spse 4.3

10

Penyusunan Rencana Induk Sistem Penyediaan Air Minum Prov. Kaltim Seleksi spse 4.3

11

Penyusunan DED Persampahan Kawasan Ekonomi Khusus Maloy Seleksi spse 4.3

12

Pengawasan (Supervisi) Pengadaan dan Pemasangan Pipa Distribusi diameter 600 mm Teritip Balikpapan Seleksi spse 4.3

HPS

No

PEKERJAAN

13

Pengawasan (supervisi) Pembangunan Gedung Pemerintah Jalan MT. Haryono Samarinda Seleksi spse 4.3

14

Penyusunan DED Air Limbah Kawasan Ekonomi Khusus Maloy Seleksi spse 4.3

15

Pengawasan (Supervisi) Lanjutan Pembangunan Mesjid Pemprov. Kaltim Seleksi spse 4.3

16

Perencanaan Revitalisasi Anjungan Kaltim Kawasan TMII di Jakarta

LPSE KUKAR 1 Pengawasan Teknis Peningkatan Jalan Bilatalang Kec. Tabang Seleksi Ulang Seleksi spse 4.3

2

Pengawasan Teknis Peningkatan Jalan Loa Sakoh - Hambau Seleksi Ulang Seleksi spse 4.3

3

Pengawasan teknis BOP Peningkatan Jalan sebelimbingan -tuana tuha Seleksi Ulang Seleksi spse 4.3

HPS

3 No

Pengawasan teknis BOP Peningkatan Jalan sebelimbingan -tuana tuha Seleksi Ulang Seleksi spse 4.3 PEKERJAAN

4

Pengawasan Teknis Peningkatan Jalan di Kecamatan Kenohan Seleksi spse 4.3

5

Perencanaan Teknis Pembangunan Jembatan Di Kecamatan Muara Jawa Seleksi spse 4.3

6

Pengawasan teknis peningkatan jalan di kecamatan tabang Seleksi spse 4.3

LPSE SAMARINDA 1

Belanja Modal Gedung dan Bangunan - Belanja Jasa Konsultansi Perencanaan

HPS

No

PEKERJAAN

LPSE KALTARA 1

Belanja Modal Gedung dan Bangunan - Belanja Jasa Konsultansi Perencanaan

LPSE MAHULU 1

Pengawasan Peningkatan Jalan Poros Batu Dinding Menuju RS Pratama Seleksi spse 4.3

2

Pengawasan Peningkatan Jalan Long Gelawang - Simpang Seroja (DAK Penugasan Bidang Jalan) Seleksi spse 4.3

2

Pengawasan Peningkatan Jalan Batas Kubar Simpang RTC (BANKEU) Seleksi spse 4.3

LPSE KUBAR 1

Pengawasan Peningkatan Jalan Sp. GBU - Besiq Seleksi spse 4.3

2

Pengawasan Peningkatan Jalan Poros - Mendika (DAK Fisik) Seleksi spse 4.3

3

Pengawasan Peningkatan Jalan Tebisaq - Gunung Bayan Seleksi spse 4.3

HPS

3 No

Pengawasan Peningkatan Jalan Tebisaq - Gunung Bayan Seleksi spse 4.3 PEKERJAAN

4

Pengawasan Pembangunan Jalan Muara Pahu - Penyinggahan (Bankeu Provinsi TA 2019) Seleksi Ulang Seleksi spse 4.3

5

Perencanaan Peningkatan Jalan Resak - Bukit Harapan-Sp. Pering Taliq-Lemper-Deraya-GerunggungTanjung Soke (Bankeu Provinsi TA 2019) Tender spse 4.3

6

Pengawasan Pembangunan Jembatan Sei Siat

7

Pengawasan Pembangunan Jembatan Sei Ohong Kampung Mancong

8

Penyusunan DED Jaringan Irigasi Kampung Sebelang Kecamatan Muara Pahu

HPS

No

PEKERJAAN

HPS

TANGGAL PRINT Thursday, April 04, 2019 TAHAP

MULAI

SAMPAI

KET

PQ

05/Mar/2019 - 10:01

15/Mar/2019 - 14:00

-

Pembuktian

25/Mar/2019 - 8:00

25/Mar/2019 - 15:00

-

Upload

04/Apr/2019 - 10:01

09/Apr/2019 - 14:00

SISA 5 HARI LAGI

PQ

06/Mar/2019 - 15:00

18/Mar/2019 - 14:00

-

Pembuktian

26/Mar/2019 - 9:00

27/Mar/2019 - 15:00

-

Upload

08/Apr/2019 - 15:00

11/Apr/2019 - 10:00

SISA 7 HARI LAGI

PQ

04/Mar/2019 - 15:00

14/Mar/2019 - 9:00

-

Pembuktian

25/Mar/2019 - 8:00

26/Mar/2019 - 15:00

-

Upload

04/Apr/2019 - 14:00

09/Apr/2019 - 9:00

SISA 5 HARI LAGI

PQ

04/Mar/2019 - 15:00

14/Mar/2019 - 9:00

-

Pembuktian

25/Mar/2019 - 8:00

26/Mar/2019 - 15:00

-

Upload

04/Apr/2019 - 14:00

09/Apr/2019 - 9:00

SISA 5 HARI LAGI

PQ

11/Mar/2019 - 11:05

18/Mar/2019 - 10:59

-

Pembuktian

25/Mar/2019 - 8:00

25/Mar/2019 - 15:00

-

Upload

04/Apr/2019 - 10:00

09/Apr/2019 - 14:00

SISA 5 HARI LAGI

PQ

05/Mar/2019 - 10:01

15/Mar/2019 - 14:00

-

Pembuktian

25/Mar/2019 - 8:00

25/Mar/2019 - 15:00

-

Upload

04/Apr/2019 - 10:01

09/Apr/2019 - 14:00

SISA 5 HARI LAGI

PQ

05/Mar/2019 - 10:01

15/Mar/2019 - 14:00

-

Pembuktian

25/Mar/2019 - 8:00

25/Mar/2019 - 15:00

-

Upload

04/Apr/2019 - 10:01

09/Apr/2019 - 14:00

SISA 5 HARI LAGI

TAHAP

MULAI

SAMPAI

KET

PQ

08/Mar/2019 - 15:00

20/Mar/2019 - 14:00

-

Pembuktian

26/Mar/2019 - 9:00

27/Mar/2019 - 15:00

-

Upload

08/Apr/2019 - 15:00

11/Apr/2019 - 10:00

SISA 7 HARI LAGI

PQ

08/Mar/2019 - 10:01

18/Mar/2019 - 14:00

-

Pembuktian

25/Mar/2019 - 8:00

25/Mar/2019 - 15:00

-

Upload

04/Apr/2019 - 10:01

09/Apr/2019 - 14:00

SISA 5 HARI LAGI

PQ

05/Mar/2019 - 11:01

15/Mar/2019 - 14:00

-

Pembuktian

25/Mar/2019 - 8:00

26/Mar/2019 - 15:00

-

Upload

04/Apr/2019 - 11:05

09/Apr/2019 - 14:00

SISA 5 HARI LAGI

PQ

05/Mar/2019 - 10:01

15/Mar/2019 - 14:00

-

Pembuktian

25/Mar/2019 - 8:00

25/Mar/2019 - 15:00

-

Upload

04/Apr/2019 - 10:01

09/Apr/2019 - 14:00

SISA 5 HARI LAGI

PQ

05/Mar/2019 - 10:01

15/Mar/2019 - 14:00

-

Pembuktian

25/Mar/2019 - 8:00

25/Mar/2019 - 15:00

-

Upload

04/Apr/2019 - 10:01

09/Apr/2019 - 14:00

SISA 5 HARI LAGI

TAHAP

MULAI

SAMPAI

KET

PQ

04/Mar/2019 - 10:01

14/Mar/2019 - 14:00

-

Pembuktian

25/Mar/2019 - 8:00

25/Mar/2019 - 15:00

-

Upload

04/Apr/2019 - 10:01

09/Apr/2019 - 14:00

SISA 5 HARI LAGI

PQ

05/Mar/2019 - 10:01

15/Mar/2019 - 14:00

-

Pembuktian

25/Mar/2019 - 8:00

25/Mar/2019 - 15:00

-

Upload

04/Apr/2019 - 10:01

09/Apr/2019 - 14:00

SISA 5 HARI LAGI

PQ

05/Mar/2019 - 10:01

15/Mar/2019 - 14:00

-

Pembuktian

25/Mar/2019 - 8:00

25/Mar/2019 - 15:00

-

Upload

04/Apr/2019 - 10:01

09/Apr/2019 - 14:00

SISA 5 HARI LAGI

PQ

19/Mar/2019 - 10:01

26/Mar/2019 - 10:00

-

Pembuktian

27/Mar/2019 - 8:00

27/Mar/2019 - 14:00

-

Upload

08/Apr/2019 - 10:01

11/Apr/2019 - 23:59

SISA 7 HARI LAGI

PQ

13/Mar/2019 - 10:01

21/Mar/2019 - 10:00

-

Pembuktian

25/Mar/2019 - 8:00

25/Mar/2019 - 15:00

-

Upload

05/Apr/2019 - 10:01

08/Apr/2019 - 10:00

SISA 4 HARI LAGI

PQ

13/Mar/2019 - 10:01

21/Mar/2019 - 10:00

-

Pembuktian

25/Mar/2019 - 8:00

25/Mar/2019 - 15:00

-

Upload

05/Apr/2019 - 10:01

08/Apr/2019 - 10:00

SISA 4 HARI LAGI

PQ

13/Mar/2019 - 10:01

21/Mar/2019 - 10:00

-

Pembuktian

25/Mar/2019 - 8:00

25/Mar/2019 - 15:00

-

TAHAP

MULAI

SAMPAI

KET

Upload

05/Apr/2019 - 10:01

08/Apr/2019 - 10:00

SISA 4 HARI LAGI

PQ

01/Mar/2019 - 8:00

11/Mar/2019 - 8:30

-

Pembuktian

15/Mar/2019 - 8:00

18/Mar/2019 - 15:00

-

Upload

29/Mar/2019 - 8:00

04/Apr/2019 - 9:00

-

PQ

01/Mar/2019 - 8:00

11/Mar/2019 - 8:30

-

Pembuktian

12/Mar/2019 - 8:00

13/Mar/2019 - 15:00

-

Upload

27/Mar/2019 - 8:00

01/Apr/2019 - 9:00

-

PQ

01/Mar/2019 - 8:00

11/Mar/2019 - 8:30

-

Pembuktian

15/Mar/2019 - 8:00

18/Mar/2019 - 15:00

-

Upload

29/Mar/2019 - 8:00

04/Apr/2019 - 9:00

-

PQ

04/Mar/2019 - 0:00

07/Mar/2019 - 12:00

-

Pembuktian

11/Mar/2019 - 9:00

11/Mar/2019 - 13:55

-

Upload

21/Mar/2019 - 13:00

25/Mar/2019 - 10:00

-

TAHAP

MULAI

SAMPAI

KET

PQ

13/Feb/2019 - 11:00

25/Feb/2019 - 15:00

-

Pembuktian

28/Feb/2019 - 8:00

28/Feb/2019 - 14:00

-

Upload

15/Mar/2019 - 0:00

18/Mar/2019 - 23:59

-

PQ

02/Mar/2019 - 8:00

08/Mar/2019 - 16:30

-

Pembuktian

11/Mar/2019 - 8:00

11/Mar/2019 - 16:30

-

Upload

22/Mar/2019 - 8:00

25/Mar/2019 - 16:30

-

PQ

02/Mar/2019 - 8:00

08/Mar/2019 - 16:30

-

Pembuktian

11/Mar/2019 - 8:00

11/Mar/2019 - 16:30

-

Upload

22/Mar/2019 - 8:00

25/Mar/2019 - 16:30

-

PQ

02/Mar/2019 - 8:00

08/Mar/2019 - 16:30

-

Pembuktian

11/Mar/2019 - 8:00

11/Mar/2019 - 16:30

-

Upload

22/Mar/2019 - 8:00

25/Mar/2019 - 16:30

-

PQ

13/Mar/2019 - 15:00

22/Mar/2019 - 13:00

-

Pembuktian

27/Mar/2019 - 9:00

27/Mar/2019 - 14:00

-

Upload

02/Apr/2019 - 9:00

10/Apr/2019 - 13:00

SISA 6 HARI LAGI

PQ

13/Mar/2019 - 15:00

22/Mar/2019 - 13:00

-

Pembuktian

27/Mar/2019 - 9:00

27/Mar/2019 - 14:00

-

Upload

02/Apr/2019 - 9:00

10/Apr/2019 - 13:00

SISA 6 HARI LAGI

PQ

13/Mar/2019 - 15:00

22/Mar/2019 - 13:00

-

Pembuktian

27/Mar/2019 - 9:00

27/Mar/2019 - 14:00

-

TAHAP

MULAI

SAMPAI

KET

Upload

02/Apr/2019 - 9:00

10/Apr/2019 - 13:00

SISA 6 HARI LAGI

PQ

04/Mar/2019 - 14:01

12/Mar/2019 - 13:00

-

Pembuktian

15/Mar/2019 - 9:00

15/Mar/2019 - 14:00

-

Upload

25/Mar/2019 - 14:01

28/Mar/2019 - 14:00

-

PQ

04/Mar/2019 - 13:01

14/Mar/2019 - 13:00

-

Pembuktian

19/Mar/2019 - 9:00

19/Mar/2019 - 14:00

-

Upload

01/Apr/2019 - 13:01

05/Apr/2019 - 11:00

SISA 1 HARI LAGI

PQ

13/Mar/2019 - 15:00

22/Mar/2019 - 13:00

-

Pembuktian

27/Mar/2019 - 9:00

27/Mar/2019 - 14:00

-

Upload

02/Apr/2019 - 9:00

10/Apr/2019 - 13:00

SISA 6 HARI LAGI

PQ

13/Mar/2019 - 15:00

22/Mar/2019 - 13:00

-

Pembuktian

27/Mar/2019 - 9:00

27/Mar/2019 - 14:00

-

Upload

02/Apr/2019 - 9:00

10/Apr/2019 - 13:00

SISA 6 HARI LAGI

PQ

19/Mar/2019 - 12:01

19/Mar/2019 - 12:00

-

Pembuktian

01/Apr/2019 - 9:00

01/Apr/2019 - 15:30

-

Upload

10/Apr/2019 - 12:01

12/Apr/2019 - 15:00

SISA 8 HARI LAGI

TAHAP

MULAI

SAMPAI

KET

Pengawasan Peningkatan Jalan Sp. GBU - Besiq Seleksi spse 4.3 Pengawasan Peningkatan Jalan Poros - Mendika (DAK Fisik) Seleksi spse 4.3 Pengawasan Peningkatan Jalan Tebisaq - Gunung Bayan Seleksi spse 4.3 Pengawasan Pembangunan Jalan Muara Pahu - Penyinggahan (Bankeu Provinsi TA 2019) Seleksi Ulang Seleksi spse 4.3 Perencanaan Peningkatan Jalan Resak - Bukit Harapan-Sp. Pering Taliq-Lemper-Deraya-Gerunggung-Tanjung Soke (Bankeu Provinsi TA 2019) Tender spse 4.3

i TA 2019) Tender spse 4.3

Related Documents

Jadwal
July 2020 42
Jadwal Kegiatan.docx
April 2020 21
Rancangan Jadwal
December 2019 22
Jadwal Juli.xlsx
November 2019 25
Jadwal Penelitian
October 2019 33

More Documents from "Dwi Purwaningsih"

Jadwal Lpse.xlsx
November 2019 28
Lotm V1.docx
November 2019 33
Bagian 2
October 2019 35
Doc1.docx
May 2020 17
Asp
October 2019 22