Improving Equipment Reliability using a CMMS/EAM Ben Stevens, OMDEC Inc IPAMC 2006

Ben Stevens OMDEC Inc – Improving Equipment Reliability using a CMMS/EAM

www.ipamc.org

Phase 0 – Manual operation, no CMMS

Phase 1: Automate Forms: Work Orders Purchase Orders Issue slips Time cards Specifications

Project led by IT; KPI’s are IT efficiency, database type

35%

CMMS/EAM Evolution Phase 2: Automate Processes: Work Request/Work Order Work Order/ Material Issue Work Order/ Purchasing

Phase 4: Analysis, Information, Knowledge Base, Integration with intelligent agents to improve the quality of the Maintenance Plan

Phase 3: Use of Workflow, Work Management Emergence of EAM Merge and eliminate tasks Streamline functions

Project led by IT; KPI’s are IT efficiency, database type, degree of integration

Project led by Business Unit; KPI’s are cost reduction, materials usage employee productivity

40%

20%

Project led by Maintenance; KPI’s are equipment reliability, number of failures, quality of maintenance, use of best practices

Ben Stevens OMDEC Inc – Improving Equipment Reliability using a CMMS/EAM

5% www.ipamc.org

Cost of Failure

Cost of Failure = Cost of Repair + Cost of Lost Revenue + Penalty Costs

Ben Stevens OMDEC Inc – Improving Equipment Reliability using a CMMS/EAM

www.ipamc.org

Failure Costs

Ben Stevens OMDEC Inc – Improving Equipment Reliability using a CMMS/EAM

www.ipamc.org

The Risks of Equipment Failure Unit

Repair Cost

Repair Time

Outage cost per Hour

Repair Risk

Failure Cost

Failure time

Failure Probab 30 days

Run Risk

Risk Ratio

Niigata Diesel

25,000

15 hours

1,000

40,000

100,000

28 days

25%

193,000

193:40 = 5:1

Yuko Turbine

120,000

1 week

2,000

361,000

250,000

60 days

15%

470,000

470:361 = 1.3:1

Ben Stevens OMDEC Inc – Improving Equipment Reliability using a CMMS/EAM

www.ipamc.org

Ben Stevens OMDEC Inc – Improving Equipment Reliability using a CMMS/EAM

www.ipamc.org

Ben Stevens OMDEC Inc – Improving Equipment Reliability using a CMMS/EAM

www.ipamc.org

Risk versus Time in Equipment Failure

Cost

Run Risk

Next Scheduled Outage Run Risk Repair Risk Repair Risk

Time

Ben Stevens OMDEC Inc – Improving Equipment Reliability using a CMMS/EAM

www.ipamc.org

Equipment Failure Risk Ratio Risk Ratio Maximum Acceptable Level of risk

Predicted Risk Ratio level

20 15

Next Planned shutdown date

10 5

Aug 1

Sep 1

Oct 1

Nov 1

Ben Stevens OMDEC Inc – Improving Equipment Reliability using a CMMS/EAM

www.ipamc.org