Oee Equipment Reliability-1 Machine

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Oee Equipment Reliability-1 Machine as PDF for free.

More details

  • Words: 219
  • Pages: 1
Overall Equipment Effectiveness Calculator Enter your data into the white boxes and click the page to calculate the OEE figure. Place the cursor over the boxes for more information. Print out the report for easy reference.

Period/Equipment

Time

Availability Rate =

Performance Rate =

Date / Time Period / Equipment

A

Total Time Available

480

minutes

B

Scheduled Downtime

48

minutes

C

Unscheduled Downtime

35

minutes

D

Operating Time (A-B-C)

397

minutes

D/(A-B)

E

Total Production

11993

F

Ideal Run/Cycle Time

34

(E/D)/F

G Quality Rate =

OEE 79.00%

91.90%

pieces per minute

88.85%

Reject/Scrap Produced

389

(E-G)/E

pieces

96.76%

Availability Rate

Performance Rate

Quality Rate

91.90%

88.85%

96.76%

Prodigy industrial automation software can fully automate data collection and OEE calculation saving time and freeing your staff to do more value added work. Further information can be found at our website

HMI SCADA DCS

pieces

www.tascomp.com

Tascomp Limited

Industrial Computer Software Newburgh Court Belasis Hall Technology Park Billingham TS23 4EE UK Tel: +44 (0) 1642 370666 Fax: +44 (0) 1642 370012

If you have found this spreadhseet useful, have any comments or would like to be sent further information on Prodigy industrial automation software please click here to email [email protected] E & OE. This spreadsheet is provided for demonstration purposes only. Tascomp accepts no liability for errors or ommissions.

Related Documents