Hitungan Jembatan.xlsx

  • Uploaded by: Ilham Fauzi
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Hitungan Jembatan.xlsx as PDF for free.

More details

  • Words: 58,995
  • Pages: 424
NO

Kode Rek.

Uraian

Pagu

Desa

Kecamatan

Bagian

KPA

PPK

PPTK

PPHP1

PPHP2

PENGAWAS

1.03.1.03.01.30.

1

2

3

4

5

6

7

8

9

10

1212

PEMBANGUNAN JEMBATAN DUKUH SOKO RW.11 BRAMBANG KEC. KARANGAWEN

1190 BETONISASI JALAN DK. DELIK RT 03/14 DESA JRAGUNG KEC. KARANGAWEN

150,000,000.00 BRAMBANG

KARANGAWEN UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

75,000,000.00 JRAGUNG

KARANGAWEN UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1438 BETONISASI JALAN RT 06 RW II DESA BANDUNGREJO KEC. MRANGGEN

200,000,000.00 BANDUNGREJO

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1488 BETONISASI JALAN RW 03 DESA BANDUNGREJO, MRANGGEN

100,000,000.00 BANDUNGREJO

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1489 BETONISASI JALAN RW 06 DESA BANDUNGREJO, MRANGGEN

100,000,000.00 BANDUNGREJO

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

50,000,000.00 BANDUNGREJO

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1509 PEMBANGUNAN SUMUR ARTETIS 1 PAKET RT 7 RW 6 DESA BANDUNGREJO KECAMATAN MRANGGEN

100,000,000.00 BANDUNGREJO

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1173 PEMBANGUNAN JEMBATAN KARANGLO BANYUMENENG KEC. MRANGGEN

150,000,000.00 BANYUMENENG MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1265 BETONISASI JL. KIDUL RELL KEDUNG DOLOK BANYUMENENG MRANGGEN DEMAK

150,000,000.00 BANYUMENENG MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1491 PERBAIKAN JEMBATAN DESA BANDUNGREJO, MRANGGEN

1029 PENGERASAN JALAN DUKUH DALEMAN KE DUKUH GEBANGSARI DESA BATURSARI KECAMATAN MRANGGEN

50,000,000.00 BATURSARI

MRANGGEN

PENGERASAN JALAN DUKUH DALEMAN KE DUKUH GEBANGSARI DESA BATURSARI KECAMATAN MRANGGEN

11

12

13

14

15

16

17

18

19

1145 BETONISASI JALAN RW 32 DESA BATURSARI KEC. MRANGGEN

75,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1150 PAVINGISASI JALAN PUCANG PENI ,PUCANGGADING BATURSARI KEC. MRANGGEN

100,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1151 PAVINGISAI JALAN RW 11 DESA BATURSARI KEC. MRANGGEN

100,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1152 PAVINGISASI JALAN ARGO SANTOSO BATURSARI KEC.MRANGGEN

100,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1183 PAVINGISASI JALAN PUCANG TAMA BATURSARI KEC.MRANGGEN

150,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1184 PAVINGISASI JALAN PUCANG ANOM BATURSARI KEC.MRANGGEN

150,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1185 PENINGKATAN JALAN PUCANG JAJAR TIMUR BATURSARI KEC.MRANGGEN

100,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1186 PENINGKATAN JALAN PUCANG KARYA BATURSARI KEC.MRANGGEN

100,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1188 PAVINGISASI JALAN DK.KAYON RW.02 BATURSARI KEC.MRANGGEN

75,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

20

21

22

23

24

25

26

27

28

29

1192 PEMBUATAN TOWER SUMUR ARTETIS DK.KAYON RW.02 DESA BATURSARI KEC.MRANGGEN

50,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1210 PEMBANGUNAN SUMUR ARTETIS RT.05 RW.10 PUCANGGADING BATURSARI KEC.MRANGGEN

75,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1220 BETONISASI JALAN KAYON RW.01 BATURSARI KEC.MRANGGEN DEMAK

75,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1352 REHAB GEDUNG SDN 6 BATURSARI KECAMATAN MRANGGEN

200,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1487 BETONISASI JALAN RW 03 DESA BATURSARI, MRANGGEN

200,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

75,000,000.00 BATURSARI

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1158 PAVINGISASI JALAN PUCANGSARI RW 17 DESA BATURSARI KEC. MRANGGEN 1642 PEMBANGUNAN TALUD JAMUS GREJAN RT. 05/02 DS. JAMUS KEC. MRANGGEN

100,000,000.00 JAMUS

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1106 PEMBANGUNAN JALAN RT. 05 RW. 02 DK. DONGKO DESA KEBONBATUR KEC. MRANGGEN

150,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1108 PEMBANGUNAN JALAN MENUJU MAKAM DESA KEBONBATUR KEC. MRANGGEN

100,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1170 BETONISASI JALAN DK. KADILANGON RT. 04 RW. 07 KEBONBATUR KEC. MRANGGEN

30

31

32

33

34

35

36

37

38

BETONISASI JALAN DK. KADILANGON RT. 04 RW. 07 KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1194 PEMBANGUNAN JALAN DI RW. 10 KEBON ARUM UTARA KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1195 PEMBANGUNAN JALAN DI RW. 11 KEBON ARUM SELATAN KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1197 PEMBANGUNAN JALAN DI RW. 13 KEBON REJO TIMUR KEBONBATUR KEC. MRANGGEN

100,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1198 PEMBANGUNAN JALAN DI RW. 14 KEBON REJO BARAT KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1199 PEMBANGUNAN JALAN DI RW. 15 KEBON AGUNG SELATAN KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1200 PEMBANGUNAN JALAN DI RW. 16 KEBON AGUNG BARAT KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1201 PEMBANGUNAN JALAN DI RW. 17 KEBON AGUNG UTARA KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1202 PEMBANGUNAN JALAN DI RW. 18 KEBON REJO TENGAH KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1204 PEMBANGUNAN JALAN DI RW. 20 KEBON SAWIT KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

PEMBANGUNAN JALAN DI RW. 20 KEBON SAWIT KEBONBATUR KEC. MRANGGEN 39

40

41

42

43

44

45

46

47

1205 PEMBANGUNAN JALAN DI RW. 21 KEBON PENI DAN KEBON ADI KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1206 PEMBANGUNAN JALAN DI RW. 22 KEBON INDAH KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1207 PEMBANGUNAN JALAN DI RW. 23 KEBON SUBUR KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1208 PEMBANGUNAN JALAN DI RW. 24 KEBON PERMAI KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1209 PEMBANGUNAN JALAN DI RW. 25 KEBON ARUM PERMAI KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1645 PEMBUATAN SUMUR ARTETIS DAN TOWER RT. 06/05 DS. KEBONBATUR KEC. MRANGGEN

200,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN NUR SALIM

MOH FAUZI, SE

1009 PEMBUATAN SUMUR ARTETIS RT. 06/02 DK. TEGUHAN DS. WRINGINJAJAR KEC.MRANGGEN

150,000,000.00 WRINGINJAJAR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1162 BETONISASI JALAN RT.02 RW.02 WRINGINJAJAR KEC.MRANGGEN

75,000,000.00 WRINGINJAJAR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

1425 BETONISASI JALAN RW 04 DESA WRINGINJAJAR KEC.MRANGGEN

100,000,000.00 WRINGINJAJAR

MRANGGEN

UPTD IV BUDIHARJO, ST

SLAMET PRIYADI, SE

ARIFIN IMAM SOFI'I

MOH FAUZI, SE

NO

Kode Rek.

Uraian

Pagu

Desa

Kecamatan

Bagian

TGL SURVEY

TGL UITZET

KETERANGAN

1.03.1.03.01.30.

1

2

1212 PEMBANGUNAN JEMBATAN DUKUH SOKO RW.11 BRAMBANG KEC. KARANGAWEN 1190 BETONISASI JALAN DK. DELIK RT 03/14 DESA JRAGUNG KEC. KARANGAWEN

150,000,000.00 BRAMBANG

KARANGAWEN UPTD IV

CV. SUBUR JAYA

BETONISASI JALAN DK. DELIK RT 03/14 DESA JRAGUNG KEC. KARANGAWEN 3

4

5

6

7

8

9

10

11

75,000,000.00 JRAGUNG

KARANGAWEN UPTD IV

CV. IKMAL JAYA

1438 BETONISASI JALAN RT 06 RW II DESA BANDUNGREJO KEC. MRANGGEN

200,000,000.00 BANDUNGREJO

MRANGGEN

UPTD IV

CV. RAHMAT PUTRA

1488 BETONISASI JALAN RW 03 DESA BANDUNGREJO, MRANGGEN

100,000,000.00 BANDUNGREJO

MRANGGEN

UPTD IV

CV. SUBUR JAYA

1489 BETONISASI JALAN RW 06 DESA BANDUNGREJO, MRANGGEN

100,000,000.00 BANDUNGREJO

MRANGGEN

UPTD IV

CV. SUBUR JAYA

50,000,000.00 BANDUNGREJO

MRANGGEN

UPTD IV

CV. SALSA INDAH

1509 PEMBANGUNAN SUMUR ARTETIS 1 PAKET RT 7 RW 6 DESA BANDUNGREJO KECAMATAN MRANGGEN

100,000,000.00 BANDUNGREJO

MRANGGEN

UPTD IV

CV. TIRTO TOWO TEHNIK

1173 PEMBANGUNAN JEMBATAN KARANGLO BANYUMENENG KEC. MRANGGEN

150,000,000.00 BANYUMENENG MRANGGEN

UPTD IV

CV. MITRA USAHA

1265 BETONISASI JL. KIDUL RELL KEDUNG DOLOK BANYUMENENG MRANGGEN DEMAK

150,000,000.00 BANYUMENENG MRANGGEN

UPTD IV

1491 PERBAIKAN JEMBATAN DESA BANDUNGREJO, MRANGGEN

1029 PENGERASAN JALAN DUKUH DALEMAN KE DUKUH GEBANGSARI DESA BATURSARI KECAMATAN MRANGGEN

1145 BETONISASI JALAN RW 32 DESA BATURSARI KEC. MRANGGEN

50,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. ANEKA KARYA DEMAK

75,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. EKA KARYA

BETONISASI JALAN RW 32 DESA BATURSARI KEC. MRANGGEN 12

13

14

15

16

17

18

19

20

21

1150 PAVINGISASI JALAN PUCANG PENI ,PUCANGGADING BATURSARI KEC. MRANGGEN

100,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. EVA CAHAYA HATI

1151 PAVINGISAI JALAN RW 11 DESA BATURSARI KEC. MRANGGEN

100,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. EVA CAHAYA HATI

1152 PAVINGISASI JALAN ARGO SANTOSO BATURSARI KEC.MRANGGEN

100,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. EVA CAHAYA HATI

1183 PAVINGISASI JALAN PUCANG TAMA BATURSARI KEC.MRANGGEN

150,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. MITRA USAHA

1184 PAVINGISASI JALAN PUCANG ANOM BATURSARI KEC.MRANGGEN

150,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. MITRA USAHA

1185 PENINGKATAN JALAN PUCANG JAJAR TIMUR BATURSARI KEC.MRANGGEN

100,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. MITRA USAHA

1186 PENINGKATAN JALAN PUCANG KARYA BATURSARI KEC.MRANGGEN

100,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. MITRA USAHA

1188 PAVINGISASI JALAN DK.KAYON RW.02 BATURSARI KEC.MRANGGEN

75,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. DWI PERKASA

1192 PEMBUATAN TOWER SUMUR ARTETIS DK.KAYON RW.02 DESA BATURSARI KEC.MRANGGEN

50,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. EKA KARYA

UPTD IV

PAK MUDI CV. NAIRA JAYA

1210 PEMBANGUNAN SUMUR ARTETIS RT.05 RW.10 PUCANGGADING BATURSARI KEC.MRANGGEN

75,000,000.00 BATURSARI

MRANGGEN

85786995174

22

23

24

25

26

27

28

29

30

31

1220 BETONISASI JALAN KAYON RW.01 BATURSARI KEC.MRANGGEN DEMAK

75,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. MULYA DWI PUTRA

1352 REHAB GEDUNG SDN 6 BATURSARI KECAMATAN MRANGGEN

200,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. ANEKA KARYA

1487 BETONISASI JALAN RW 03 DESA BATURSARI, MRANGGEN

200,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. SUBUR JAYA

75,000,000.00 BATURSARI

MRANGGEN

UPTD IV

CV. EVA CAHAYA HATI

1158 PAVINGISASI JALAN PUCANGSARI RW 17 DESA BATURSARI KEC. MRANGGEN 1642 PEMBANGUNAN TALUD JAMUS GREJAN RT. 5/02 DS. JAMUS KEC. MRANGGEN

100,000,000.00 JAMUS

MRANGGEN

UPTD IV

CV. ANEKA KARYA

1106 PEMBANGUNAN JALAN RT. 05 RW. 02 DK. DONGKO DESA KEBONBATUR KEC. MRANGGEN

150,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. EKA KARYA

1108 PEMBANGUNAN JALAN MENUJU MAKAM DESA KEBONBATUR KEC. MRANGGEN

100,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. EKA KARYA

1170 BETONISASI JALAN DK. KADILANGON RT. 04 RW. 07 KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. BINTORO KALOKO

1194 PEMBANGUNAN JALAN DI RW. 10 KEBON ARUM UTARA KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. SINAR UTAMA

1195 PEMBANGUNAN JALAN DI RW. 11 KEBON ARUM SELATAN KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. ARGOMULYO

32

33

34

35

36

37

38

39

40

41

1197 PEMBANGUNAN JALAN DI RW. 13 KEBON REJO TIMUR KEBONBATUR KEC. MRANGGEN

100,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. DWI PERKASA

1198 PEMBANGUNAN JALAN DI RW. 14 KEBON REJO BARAT KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. FAZA

1199 PEMBANGUNAN JALAN DI RW. 15 KEBON AGUNG SELATAN KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. MULYA DWI PUTRA

1200 PEMBANGUNAN JALAN DI RW. 16 KEBON AGUNG BARAT KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. BINTORO KALOKO

1201 PEMBANGUNAN JALAN DI RW. 17 KEBON AGUNG UTARA KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. WISNU KARYA

1202 PEMBANGUNAN JALAN DI RW. 18 KEBON REJO TENGAH KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. WISNU KARYA

1204 PEMBANGUNAN JALAN DI RW. 20 KEBON SAWIT KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. SINAR UTAMA

1205 PEMBANGUNAN JALAN DI RW. 21 KEBON PENI DAN KEBON ADI KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. EKA KARYA

1206 PEMBANGUNAN JALAN DI RW. 22 KEBON INDAH KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. BINTORO KALOKO

1207 PEMBANGUNAN JALAN DI RW. 23 KEBON SUBUR KEBONBATUR KEC. MRANGGEN

42

43

44

45

46

47

PEMBANGUNAN JALAN DI RW. 23 KEBON SUBUR KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. BINTORO KALOKO

1208 PEMBANGUNAN JALAN DI RW. 24 KEBON PERMAI KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. FAZA

1209 PEMBANGUNAN JALAN DI RW. 25 KEBON ARUM PERMAI KEBONBATUR KEC. MRANGGEN

75,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

CV. MULYA DWI PUTRA

1645 PEMBUATAN SUMUR ARTETIS DAN TOWER RT. 06/05 DS. KEBONBATUR KEC. MRANGGEN

200,000,000.00 KEBONBATUR

MRANGGEN

UPTD IV

1009 PEMBUATAN SUMUR ARTETIS RT. 06/02 DK. TEGUHAN DS. WRINGINJAJAR KEC.MRANGGEN

150,000,000.00 WRINGINJAJAR

MRANGGEN

UPTD IV

CV. TIRTO TOWO

1162 BETONISASI JALAN RT.02 RW.02 WRINGINJAJAR KEC.MRANGGEN

75,000,000.00 WRINGINJAJAR

MRANGGEN

UPTD IV

CV. GARUDA KARYA

1425 BETONISASI JALAN RW 04 DESA WRINGINJAJAR KEC.MRANGGEN

100,000,000.00 WRINGINJAJAR

MRANGGEN

UPTD IV

CV. IKMAL JAYA

SUBHAN CV. TIRTO TOWO TEHNIK 081 325 751 732

PK CARIK

PK CARIK

PK CARIK

PK CARIK

PK CARIK

PK CARIK

PK CARIK

SALSA INDAH

PROPINSI KABUPATEN

JAWA TENGAH DEMAK

HARGA SATUAN DASAR (HSD) TENAGA KERJA NO

TENAGA KERJA

KODE

SATUAN

HSD(Rp)

KET.

1

2

3

4

5

6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Catatan :

Mandor lapangan Mekanik Mekanik Pembantu Kepala Tukang Tukang Operator Telatih *) Operator Semi Telatih **) Pembantu Operator Sopir Material / Truk Sopir Personil Pembantu Sopir / Kenek Buruh Lapangan Tak Terlatih Buruh Lapangan Agak Terlatih Buruh Lapangan Terlatih Pekerja

OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH

85,800.00 80,000.00 71,600.00 75,000.00 70,000.00 74,000.00 67,000.00 73,000.00 73,000.00 73,000.00 67,000.00 59,000.00 65,000.00 67,000.00 57,400.00

a. Operator yang sudah biasa dan trampil mengoperasikan jenis peralatan untuk melayani pekerjaan berat. Misal : Bulldozer, Motor Grader, Wheel Loader, Aspalt Finisher dan lain-lain.

b. Operator yang mengoperasikan peralatan untuk melayani pekerjaan berat yang agak ringan.Misal : Steel Wheel Roller, Stamper, Mechanical Hammer, Concrete Mixer / Mesin Pengaduk Beton dan lain-lain.

NO. 1

HARGA SATUAN DASAR (HSD) BAHAN BAHAN KODE SATUAN 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Batu Gunung atau Quarry Agregat Kasar Untuk Hotmix Kerikil sungai ( dengan pasir ) Batu kali bulat Batu belah 15 - 20 cm Batu belah 10 - 15 cm Batu pecah 5 - 7 cm Batu pecah 4 - 6 cm Batu pecah 3 - 5 cm Batu pecah 2 - 3 cm Batu pecah 1 - 2 cm, 1 - 1 cm Batu pecah 0,5 - 0,5 cm Pasir urug / timbunan Batu putih Batu bata Pasir ayak untuk beton Sirtu ( tak ayak ) Timbunan pilihan ( tanah padas ) Aspal Curah Aspal

3

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 bj m3 m3 m3 kg kg

4

HSD(Rp)

KET.

5

6

192,500.00 300,000.00 250,000.00 225,000.00 251,300.00 251,300.00 251,300.00 263,000.00 288,000.00 288,000.00 275,100.00 275,100.00 117,000.00 130,000.00 700.00 352,500.00 166,600.00 115,000.00 13,500.00 10,750.00

-

21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

49

50 51 52 53 54 55 56

Minyak tanah Kayu bakar Semen ( PC ) Paku jembatan Baja tulangan beton Baja Konstruksi Kawat baja ( bindrat ) Paku Alat bantu/untuk Pek. Jalan Kayu untuk perancah/Kruing Solar ( Non subsidi ) Premium ( Non subsidi ) Pelumas Kayu Kalimantan Bengkirei Kayu Tahun Bambu Apus Bambu Ori Bambu Petung Plastik Tebal 0,08 mm Triplex tebal 12 mm Cat anti karat Cat Meny cat aluminium Cat tembok Cat kayu minyak cat Kanstein uk. 10 x 20 x 50 cm Paving Block tipe Holland 6 cm - K.225 - K.300 Paving Block Tipe Holland 8 cm - K.225 - K.300 Pipa Galvanis Ø 2,5" x 6 meter Kayu pengarah Retak Multiflex 18 mm Paku 5 & 7 cm myk bekisting

Buis beton D 20 cm Buis beton D 30 cm

L m3 50 kg/zak kg kg kg kg kg set m3 lt lt lt m3 m3 btg-4 m' btg-4 m' btg-4 m' m2 lbr kg kg kg kg kg ltr bj

10,300.00 187,000.00 71,900.00 20,000.00 10,700.00 15,400.00 17,800.00 15,500.00 68,300.00 6,000,000.00 13,700.00 7,400.00 40,000.00 7,000,000.00 2,000,000.00 13,000.00 15,000.00 18,000.00 5,200.00 160,000.00 47,500.00 30,900.00 53,700.00 25,400.00 51,400.00 17,800.00 15,000.00

m2 m2

75,000.00 85,000.00

m2 m2 btg m' lbr kg Ltr

100,000.00 115,000.00 785,000.00 5,100.00 160,000.00 15,500.00 10,300.00

Bj. Bj.

3,000.00 35,000.00

Catatan: *) Alat bantu yang diperlukan untuk menyelesaikan pekerjaan-pekerjaan tanah, pembersihan dan lain-lain dengan menggunakan tenaga manusia ( labour intensive ) **) Jarak dari pelabuhan terdekat tempat pengiriman aspaldan besi ( kelipatan 5 km )

Misal : 1 Cangkul atau sekop .. Rp. 1 Parang ...................... Rp. 1 Pikulan dan 2 Bakul .. Rp. Jumlah unt. 3 alat-alat . Rp.

26,400 23,700 18,200 68,300

-

-

PROPINSI

JAWA TENGAH

KABUPATEN

DEMAK

HARGA SATUAN DASAR (HSD) TENAGA KERJA NO

TENAGA KERJA

KODE

SATUAN

HSD(Rp)

KET.

1

2

3

4

5

6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Catatan :

Mandor lapangan Mekanik Mekanik Pembantu Kepala Tukang Tukang Operator Telatih *) Operator Semi Telatih **) Pembantu Operator Sopir Material / Truk Sopir Personil Pembantu Sopir / Kenek Buruh Lapangan Tak Terlatih Buruh Lapangan Agak Terlatih Buruh Lapangan Terlatih Pekerja

OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH

-

a. Operator yang sudah biasa dan trampil mengoperasikan jenis peralatan untuk melayani pekerjaan berat. Misal : Bulldozer, Grader, Loader, Aspalt Finisher danmelayani lain-lain. pekerjaan berat yang agak ringan.Misal : Steel Wheel Roller, Operator yang Wheel mengoperasikan peralatan untuk b. Motor Stamper, Mechanical Hammer, Concrete Mixer / Mesin Pengaduk Beton dan lain-lain. HARGA SATUAN DASAR (HSD) BAHAN BAHAN KODE SATUAN HSD(Rp) KET.

NO. 1

2

1 2 3 4

Batu Gunung atau Quarry Agregat Kasar Untuk Hotmix Kerikil sungai ( dengan pasir ) Batu kali bulat

3

m3 m3 m3 m3

4

5

6

-

-

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

49

50 51 52

Batu belah 15 - 20 cm Batu belah 10 - 15 cm Batu pecah 5 - 7 cm Batu pecah 4 - 6 cm Batu pecah 3 - 5 cm Batu pecah 2 - 3 cm Batu pecah 1 - 2 cm, 1 - 1 cm Batu pecah 0,5 - 0,5 cm Pasir urug / timbunan Batu putih Batu bata Pasir ayak untuk beton Sirtu ( tak ayak ) Timbunan pilihan ( tanah padas ) Aspal Curah Aspal Minyak tanah Kayu bakar Semen ( PC ) Paku jembatan Baja tulangan beton Baja Konstruksi Kawat baja ( bindrat ) Paku Alat bantu/untuk Pek. Jalan Kayu untuk perancah/Kruing Solar ( Non subsidi ) Premium ( Non subsidi ) Pelumas Kayu Kalimantan Bengkirei Kayu Tahun Bambu Apus Bambu Ori Bambu Petung Plastik Tebal 0,08 mm Triplex tebal 12 mm Cat anti karat Cat Meny cat aluminium Cat tembok Cat kayu minyak cat Kanstein uk. 10 x 20 x 50 cm Paving Block tipe Holland 6 cm - K.225 - K.300 Paving Block Tipe Holland 8 cm - K.225 - K.300 Pipa Galvanis Ø 2,5" x 6 meter Kayu pengarah Retak Multiflex 18 mm

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 bj m3 m3 m3 kg kg L m3 50 kg/zak kg kg kg kg kg set m3 lt lt lt m3 m3 btg-4 m' btg-4 m' btg-4 m' m2 lbr kg kg kg kg kg ltr bj m2 m2 m2 m2 btg m' lbr

-

-

-

53 54 55 56

Paku 5 & 7 cm myk bekisting

Buis beton D 20 cm Buis beton D 30 cm

kg Ltr

-

Bj. Bj.

-

Catatan: *) Alat bantu yang diperlukan untuk menyelesaikan pekerjaan-pekerjaan tanah, pembersihan dan lain-lain dengan menggunakan tenaga manusia ( labour intensive ) **) Jarak dari pelabuhan terdekat tempat pengiriman aspaldan besi ( kelipatan 5 km )

Misal : 1 Cangkul atau sekop .. Rp. 1 Parang ...................... Rp. 1 Pikulan dan 2 Bakul .. Rp. Jumlah unt. 3 alat-alat . Rp.

-

80,000.00 80,000.00 68,000.00 72,000.00 70,000.00 74,000.00 67,000.00 73,000.00 73,000.00 73,000.00 67,000.00 53,000.00 65,000.00 67,000.00 53,000.00

192,500.00 300,000.00 250,000.00 225,000.00 251,300.00 251,300.00 251,300.00 263,000.00 263,000.00 288,000.00 275,100.00 262,500.00 117,000.00 130,000.00 700.00 267,600.00 166,600.00 115,000.00 10,545.45 10,750.00

1,438.00

10,300.00 187,000.00 71,900.00 20,000.00 10,700.00 15,400.00 17,800.00 15,500.00 68,300.00 6,000,000.00 12,000.00 8,600.00 40,000.00 7,000,000.00 2,000,000.00 13,000.00 15,000.00 18,000.00 5,200.00 160,000.00 47,500.00 25,900.00 53,700.00 25,400.00 50,800.00 17,800.00 15,000.00 75,000.00 85,000.00 100,000.00 115,000.00 18,000.00 6,500.00 160,000.00 15,500.00 10,300.00

30,000.00 25,000.00

71900

DAFTAR SEWA PERALATAN (RAB) NO

NAMA ALAT

1 Dump Truck 3.5 Ton 2 Tree Wheel Roller 6-8 T 3 Vibratory Roller 5-8 T 4 Concrete Vibrator 5 Water Pump 70-100 Mm 6 Water tanker 3000-4500 L 7 Stamper 8 Jack Hammer 9 Concrete Pump 10 Concrete Mixer (350)

KODE

HP

KAPASITAS

SATUAN

HARGA ALAT (Rp)

-

100

3.5

Ton

55 82 5.5 8 100 4.7 0 100 20

8 7.1 25 4000 121 1330 8 350

Ton Ton Liter Ton m3 Liter

247,312,000.00 85,500,000.00 8,151,000.00 8,259,000.00 165,106,000.00 13,031,000.00 9,784,000.00 950,000,000.00 12,000,000.00

DAFTAR SEWA PERALATAN (HPS) NO

NAMA ALAT

1 Dump Truck 3.5 Ton 2 Tree Wheel Roller 6-8 T 3 Vibratory Roller 5-8 T 4 Concrete Vibrator 5 Water Pump 70-100 Mm 6 Water tanker 3000-4500 L 7 Stamper 8 Jack Hammer 9 Concrete Pump 10 Concrete Mixer (350)

KODE

HP

KAPASITAS

SATUAN

HARGA ALAT (Rp)

-

100

3.5

Ton

55 82 5.5 8 100 4.7 0 100 20

8 7.1 25 4000 121 1330 8 350

Ton Ton Liter Ton m3 Liter

247,312,000.00 85,500,000.00 8,151,000.00 8,259,000.00 165,106,000.00 13,031,000.00 9,784,000.00 950,000,000.00 12,000,000.00

SEWA ALAT (Rp)

357,870.13 231,102.34 270,382.48 38,016.29 39,445.19 338,932.16 36,871.77 22,935.78 516,285.92 79,616.51

357,870.13 231,102.34 270,382.48 38,016.29 39,445.19 338,932.16 36,871.77 22,935.78 516,285.92 79,616.51

SEWA ALAT (Rp)

338,467.63 219,677.34 18,375.00 34,758.79 36,105.19 320,082.16 33,746.27 20,585.78 497,435.92 73,966.51

D.2 Analisis HSD alat EXCAVATOR 90 HP Data yang diperlukan meliputi: 1) Upah pekerja, lihat CONTOH C.2, Tabel C.2 2) Harga perolehan alat, lihat CONTOH D.1, Tabel D.1 3) Harga bahan bakar/pelumas dan lainnya, lihat CONTOH E.6, Tabel E.2 I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II.

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

90.0 0.93 8.0 1,500.0 815,351,000

LAIN-LAIN Uraian

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 815,351,000.00

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

III.

Faktor Angsuran Modal =

C

81,535,100.00

D

0.26380

E

129,052.52

F

1,087.13

G

130,139.66

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (815351000-81535100) x 0,26380 = 2000

b. Asuransi, dll = Ins x B = 0,002 x 815351000 W 2000 BIAYA PASTI PER JAM = ( E + F ) = 110.874,08 + 934,00 IV. BIAYA OPERASI PER JAM KERJA Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms Jika W<1500 ambil 12%

H

147,960.00

Pelumas

= (2.5%-3%) x Pw x Mp Ambil 2,5%

I

90,000.00

Biaya bengkel

= (6.25% dan 8.75%) x B / W Bila W <1500 ambil 6,25% Perawatan dan = (12,5 % - 17,5 %) x B / W perbaikan Bila W = 0, ambil 12,5% Operator = (1 Orang / Jam ) x U1 Pembantu Operator = (1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H + I + J + K + L + M) TOTAL BIAYA SEWA ALAT EXCAVATOR 90 HP (E10)/ JAM = ( G + P )

J

47,562

K

67,945.917

L M P S

9,250.00 9,125.00 371,843.058 501,982.717

D.3 Analisis HSD DUMP TRUCK, 3,5 TON I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 135,103,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

106.0 5.00 6.0 1,500.0 135,103,000

10.00 9,125.00 8,375.00 7,400.00 13,700.00 40,000.00 0.2

C

13,510,300

D

0.26380

E

21,383.90

F

180.14

G

21,564.04

i x (l + i)ᴬ (l + i)ᴬ - 1 =

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

(B - C ) x D W (135103000-13510300)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*420000000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =49.857,72 + 420 IV. BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 190 x 6.548,35

H

174,264.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 190 x 18000

I

106,000

J

7881.008

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 420.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 420.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 11,258.6 perbaikan Operator L 9,125.00 Pembantu Operator M 8,375.00 Biaya Operasi per Jam P 316,903.59 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan TOTAL BIAYA SEWA DUMP TRUCK, 3,5 TON diambil nilai tertinggi. S 338,467.63 HP (E08)/ JAM = ( G + P ) D.3 Analisis HSD DUMP TRUCK, 5 TON I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 188,328,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

145.0 10.00 6.0 1,500.0 188,328,000

10.00 9,125.00 8,375.00 7,400.00 13,700.00 40,000.00 0.2

C

18,832,800

D

0.26380

E

29,808.27

i x (l + i)ᴬ (l + i)ᴬ - 1 =

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

(B - C ) x D W (420000000-42000000)*0,2638

2000 b. Asuransi, dll = Ins x B = 0,002*420000000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =49.857,72 + 420 IV. BIAYA OPERASI PER JAM KERJA Uraian

F

251.10

G

30,059.38

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 190 x 6.548,35

H

238,380.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 190 x 18000

I

145,000

J

10985.800

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 420.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 420.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 15,694.0 perbaikan Operator L 9,125.00 Pembantu Operator M 8,375.00 Biaya Operasi per Jam P 427,559.80 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan TOTAL BIAYA SEWA DUMP TRUCK, 5 TON diambil nilai tertinggi. S 457,619.18 HP (E09)/ JAM = ( G + P ) D.3 Analisis HSD FLAT BED TRUCK 4,0 TON I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 1,637,640,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

C i x (l + i)ᴬ (l + i)ᴬ - 1

80.0 4.00 6.0 1,500.0 1,637,640,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

163,764,000

=

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (420000000-42000000)*0,2638 2000

D

0.26380

E

259,203.18

F

2,183.52

G

261,386.70

b. Asuransi, dll = Ins x B = 0,002*420000000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =49.857,72 + 420 IV. BIAYA OPERASI PER JAM KERJA Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 190 x 6.548,35

H

131,520.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 190 x 18000

I

80,000

J

95529.000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 420.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 420.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 136,470.0 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 461,894.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA FLAT BEDberat TRUCK 4,0 TON S 723,280.70 HP (E11)/ JAM = ( G + P ) D.3 Analisis HSD GENERATOR SET I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

10.0 8.0 600.0 14,840,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 14,840,000 Faktor Angsuran Modal =

Kode

Harga

C

1,484,000

D

0.26380

E

5,872.13

F

49.47

G

5,921.60

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (420000000-42000000)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*420000000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =49.857,72 + 420 IV. BIAYA OPERASI PER JAM KERJA Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 190 x 6.548,35

H

16,440.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 190 x 18000

I

10,000

J

2164.167

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 420.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 420.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 3,091.7 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 50,070.83 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin beratSET pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA GENERATOR S 55,992.43 HP (E12)/ JAM = ( G + P ) D.3 Analisis HSD MOTOR GRADER I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Kode Pw Cp A W B

Harga

II. LAIN-LAIN Uraian Tingkat Suku Bunga

Kode i

Harga

115.0 8.0 1,500.0 619,667,000

10.00

Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 619,667,000 Faktor Angsuran Modal =

U1 U2 Mb Ms Mp Ins

Kode

9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

Harga

C

61,966,700

D

0.26380

E

98,079.96

F

826.22

G

98,906.18

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (420000000-42000000)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*420000000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =49.857,72 + 420 IV. BIAYA OPERASI PER JAM KERJA Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 190 x 6.548,35

H

189,060.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 190 x 18000

I

115,000

J

36147.242

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 420.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 420.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 51,638.9 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 410,221.16 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. MakinGRADER berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA MOTOR S 509,127.34 HP (E13)/ JAM = ( G + P ) D.3 Analisis HSD TRACK LOADER I. Uraian Tenaga

URAIAN PERALATAN Kode Pw

Harga 115.0

Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Cp A W B

II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 619,667,000 Faktor Angsuran Modal =

8.0 1,500.0 619,667,000

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

61,966,700

D

0.26380

E

98,079.96

F

826.22

G

98,906.18

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (420000000-42000000)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*420000000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =49.857,72 + 420 IV. BIAYA OPERASI PER JAM KERJA Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 190 x 6.548,35

H

189,060.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 190 x 18000

I

115,000

J

36147.242

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 420.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 420.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 51,638.9 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 410,221.16 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi.

TOTAL BIAYA SEWA TRACK LOADER HP (E14)/ JAM = ( G + P )

S

509,127.34

Asphalt Mixing Plant I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II.

Kode Pw Cp A W B

Harga 125.0 30.00 10.0 1,200.0 1,855,126,000.00

LAIN-LAIN Uraian

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 1,855,126,000.00

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

III.

Faktor Angsuran Modal =

C

185,512,600.00

D

0.26380

E

367,033.17

F

3,091.88

G

370,125.05

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = =

(B - C ) x D W = (1.855.126.966-185.512.696) x 0,26380 = 2000

b. Asuransi, dll = Ins x B = 0,002 x 1.855.126.966 W 2000 BIAYA PASTI PER JAM = ( E + F ) = 367.033,37 + 3.091,88 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms Jika W<1500 ambil 12%

H

205,500.00

Pelumas

= (2.5%-3%) x Pw x Mp Ambil 2,5%

I

125,000.00

Biaya bengkel

= (6.25% dan 8.75%) x B / W Bila W <1500 ambil 6,25% Perawatan dan = (12,5 % - 17,5 %) x B / W perbaikan Bila W = 0, ambil 12,5% Operator = (1 Orang / Jam ) x U1 Pembantu Operator = (1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H + I + J + K + L + M) TOTAL BIAYA SEWA Asphalt Mixing Plant HP (E01)/ JAM = ( G + P )

J

135,270

K

193,242.292

L M P S

9,250.00 9,125.00 677,386.896 1,047,511.947

Asphalt Finisher I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II.

Kode Pw Cp A W B

Harga 30.0 7.0 8,400.0 222,370,000.00

LAIN-LAIN Uraian

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 222,370,000.00

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

III.

Faktor Angsuran Modal =

C

22,237,000.00

D

0.26380

E

6,285.07

F

52.95

G

6,338.01

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = =

(B - C ) x D W = (222.370.786-22.237.078) x 0,26380 = 2000

b. Asuransi, dll = Ins x B = 0,002 x 222.370.786 W 2000 BIAYA PASTI PER JAM = ( E + F ) = 6.285,09 + 52,95 IV. Uraian

BIAYA OPERASI PER JAM KERJA Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms Jika W<1500 ambil 12%

H

49,320.00

Pelumas

= (2.5%-3%) x Pw x Mp Ambil 2,5%

I

30,000.00

J

2,316

K

3,309.077

L M P S

9,250.00 9,125.00 103,320.432 109,658.446

Biaya bengkel

= (6.25% dan 8.75%) x B / W Bila W <1500 ambil 6,25% Perawatan dan = (12,5 % - 17,5 %) x B / W perbaikan Bila W = 0, ambil 12,5% Operator = (1 Orang / Jam ) x U1 Pembantu Operator = (1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H + I + J + K + L + M) TOTAL BIAYA SEWA Asphalt Finisher HP (E02)/ JAM = ( G + P ) Asphalt Sprayer I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II.

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

100.0 8.0 9,600.0 36,089,000.00

LAIN-LAIN Uraian

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 36,089,000.00

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

III.

Faktor Angsuran Modal =

C

3,608,900.00

D

0.26380

E

892.52

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = =

(B - C ) x D W = (36.089.887,64-3.608.988,76) x 0,26380 = 2000

b. Asuransi, dll = Ins x B =

0,002 x 36.089.887,64

W 2000 BIAYA PASTI PER JAM = ( E + F ) = 15.581,68 + 131,26 IV.

F

7.52

G

900.04

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms Jika W<1500 ambil 12%

H

164,400.00

Pelumas

= (2.5%-3%) x Pw x Mp Ambil 2,5%

I

100,000.00

J

329

K

469.909

L M P S

9,250.00 9,125.00 283,573.845 284,473.881

Biaya bengkel

= (6.25% dan 8.75%) x B / W Bila W <1500 ambil 6,25% Perawatan dan = (12,5 % - 17,5 %) x B / W perbaikan Bila W = 0, ambil 12,5% Operator = (1 Orang / Jam ) x U1 Pembantu Operator = (1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H + I + J + K + L + M) TOTAL BIAYA SEWA Asphalt Sprayer HP (E03)/ JAM = ( G + P ) Bulldozer100-150 Hp I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II.

Kode Pw Cp A W B

Harga 7.0 8.0 1,200.0 630,046,000.00

LAIN-LAIN Uraian

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 630,046,000.00

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

III.

Faktor Angsuran Modal =

i x (l + i)ᴬ (l + i)ᴬ - 1 =

Biaya Pasti per Jam :

63,004,600.00

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

D

0.26380

a. Biaya Pengembalian Modal = =

(B - C ) x D W =(630.046.067,42-63.004.606,74) x 0,26380 = 2000

E

124,653.41

F

1,050.08

G

125,703.49

b. Asuransi, dll = Ins x B = 0,002 x 630.046.067,42 W 2000 BIAYA PASTI PER JAM = ( E + F ) = 1.904,08 + 16,04 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms Jika W<1500 ambil 12%

H

11,508.00

Pelumas

= (2.5%-3%) x Pw x Mp Ambil 2,5%

I

7,000.00

J

45,941

K

65,629.792

L M P S

9,250.00 9,125.00 148,453.646 274,157.133

Biaya bengkel

= (6.25% dan 8.75%) x B / W Bila W <1500 ambil 6,25% Perawatan dan = (12,5 % - 17,5 %) x B / W perbaikan Bila W = 0, ambil 12,5% Operator = (1 Orang / Jam ) x U1 Pembantu Operator = (1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H + I + J + K + L + M) TOTAL BIAYA SEWA Bulldozer100-150 Hp HP (E04)/ JAM = ( G + P ) Compressor 4000-6500 L\M I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II.

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

20.0 8.0 6,000.0 74,465,000.00

LAIN-LAIN Uraian

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 74,465,000.00

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

III.

7,446,500.00

Faktor Angsuran Modal =

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (744.65.168-7.446.516) x 0,26380 = 2000

D

0.26380

E

2,946.55

F

24.82

G

2,971.37

b. Asuransi, dll = Ins x B = 0,002 x 744.65.168 W 2000 BIAYA PASTI PER JAM = ( E + F ) = 2.946,56 + 24,82 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms Jika W<1500 ambil 12%

H

32,880.00

Pelumas

= (2.5%-3%) x Pw x Mp Ambil 2,5%

I

20,000.00

J

1,086

K

1,551.354

L M P S

9,250.00 9,125.00 73,892.302 76,863.676

Biaya bengkel

= (6.25% dan 8.75%) x B / W Bila W <1500 ambil 6,25% Perawatan dan = (12,5 % - 17,5 %) x B / W perbaikan Bila W = 0, ambil 12,5% Operator = (1 Orang / Jam ) x U1 Pembantu Operator = (1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H + I + J + K + L + M) TOTAL BIAYA SEWA Compressor 4000-6500 L\M HP (E05)/ JAM = ( G + P ) Concrete Mixer 0.3-0.6 M³ I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II.

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

5.0 7,500.0 12,708,000.00

LAIN-LAIN Uraian

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III.

BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 12,708,000.00 Faktor Angsuran Modal =

Kode

Harga 1,270,800.00

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (12.708.988-1.270.898) x 0,26380 = 2000

D

0.26380

E

402.28

F

3.39

G

405.67

b. Asuransi, dll = Ins x B = 0,002 x12.708.988 W 2000 BIAYA PASTI PER JAM = ( E + F ) = 402,31 + 3,39 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms Jika W<1500 ambil 12%

H

-

Pelumas

= (2.5%-3%) x Pw x Mp Ambil 2,5%

I

-

J

148

K

211.800

L M P S

9,250.00 9,125.00 18,735.060 19,140.729

Biaya bengkel

= (6.25% dan 8.75%) x B / W Bila W <1500 ambil 6,25% Perawatan dan = (12,5 % - 17,5 %) x B / W perbaikan Bila W = 0, ambil 12,5% Operator = (1 Orang / Jam ) x U1 Pembantu Operator = (1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H + I + J + K + L + M) TOTAL BIAYA SEWA Concrete Mixer 0.3-0.6 M³ HP (E06)/ JAM = ( G + P ) D.2 Analisis HSD alat EXCAVATOR 80-140 HP I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II.

Kode Pw Cp A W B

Harga 133.0 0.93 5.0 2,000.0 934000000.000

Kode

Harga

LAIN-LAIN Uraian

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 934,000,000.00

i U1 U2 Mb Ms Mp Ins

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

III.

Faktor Angsuran Modal =

Kode

Harga

C

93,400,000.00

D

0.26380

E

110,874.08

F

934.00

G

111,808.08

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (934000000-93400000) x 0,26380 = 2000

b. Asuransi, dll = Ins x B = 0,002 x 934.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) = 110.874,08 + 934,00 IV. BIAYA OPERASI PER JAM KERJA Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms Jika W<1500 ambil 12%

H

218,652.00

Pelumas

= (2.5%-3%) x Pw x Mp Ambil 2,5%

I

133,000.00

J

40,863

K

58,375.000

L M P S

9,250.00 9,125.00 469,264.500 581,072.581

Biaya bengkel

= (6.25% dan 8.75%) x B / W Bila W <1500 ambil 6,25% Perawatan dan = (12,5 % - 17,5 %) x B / W perbaikan Bila W = 0, ambil 12,5% Operator = (1 Orang / Jam ) x U1 Pembantu Operator = (1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H + I + J + K + L + M) TOTAL BIAYA SEWA ALAT EXCAVATOR 80-140 HP (E10.a)/ JAM = ( G + P ) D.3 Analisis HSD DUMP TRUCK, 10 TON I. Uraian Tenaga Kapasitas

URAIAN PERALATAN Kode Pw Cp

Harga 190.0 10.00

Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

A W B

II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 420,000,000 Faktor Angsuran Modal =

5.0 2,000.0 420,000,000

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

10.00 9,125.00 8,375.00 7,400.00 13,700.00 40,000.00 0.2

C

42,000,000

D

0.26380

E

49,857.72

F

420.00

G

50,277.72

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (420000000-42000000)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*420000000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =49.857,72 + 420 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 190 x 6.548,35

H

312,360.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 190 x 18000

I

190,000

J

18375.000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 420.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 420.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 26,250.0 perbaikan Operator L 9,125.00 Pembantu Operator M 8,375.00 Biaya Operasi per Jam P 564,485.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi.

TOTAL BIAYA SEWA ALAT DUMP TRUCK, 10 TON HP (E09.a)/ JAM = ( G + P )

S

614,762.72

Crane 10-15 Ton I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 262,020,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

138.0 15.00 5.0 2,000.0 262,020,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

26,202,000

D

0.26380

E

31,104.10

F

262.02

G

31,366.12

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (262.020.225-26.202.022,5)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*262.020.225 W 2000 BIAYA PASTI PER JAM = ( E + F ) =31.104,12 + 262,02 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 138 x 6.548,35

H

226,872.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 138 x 18000

I

138,000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 262.020.225 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 262.020.225 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

J

11463.375

Perawatan dan K 16,376.3 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 411,086.63 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 442,452.74 HP (E07)/ JAM = ( G + P ) Stamper I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 13,031,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

4.7 121.00 5.0 2,000.0 13,031,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

1,303,100

D

0.26380

E

1,546.90

F

13.03

G

1,559.93

i x (l + i)ᴬ (l + i)ᴬ - 1 =

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

(B - C ) x D W (13.031.461-1.303.146,1)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*13.031.461 W 2000 BIAYA PASTI PER JAM = ( E + F ) =1.546,95 + 1559,98 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 4,7 x 6.548,35

H

7,726.80

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 4,7 x 18000

I

4,700

J

570.106

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 13.031.461 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 13.031.461 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 814.4 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 32,186.34 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 33,746.27 HP (E25)/ JAM = ( G + P ) Track Loader 75-100 Hp I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 856,120,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

70.0 0.80 5.0 2,000.0 856,120,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

85,612,000

D

0.26380

i x (l + i)ᴬ (l + i)ᴬ - 1 =

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

(B - C ) x D W

=

(856.120.225-85.612.022,5)*0,2638 2000

E

101,629.03

F

856.12

G

102,485.15

b. Asuransi, dll = Ins x B = 0,002*13.031.461 W 2000 BIAYA PASTI PER JAM = ( E + F ) =1.546,95 + 1559,98 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 70 x 6.548,35

H

115,080.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 70 x 18000

I

70,000

J

37455.250

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 856.120.225 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 856.120.225 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 53,507.5 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 294,417.75 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 396,902.90 HP (E14.a)/ JAM = ( G + P ) Wheel Loader 1.0-1.6 M³ I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 448,443,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

C i x (l + i)ᴬ

96.0 1.50 5.0 2,000.0 448,443,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

44,844,300

(l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (448.443.820-44.844.382,0)*0,2638 2000

D

0.26380

E

53,234.16

F

448.44

G

53,682.60

b. Asuransi, dll = Ins x B = 0,002*13.031.461 W 2000 BIAYA PASTI PER JAM = ( E + F ) =1.546,95 + 1559,98 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 96 x 6.548,35

H

157,824.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 96 x 18000

I

96,000

J

19619.381

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 448.443.820 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 448.443.820 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 28,027.7 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 319,846.07 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 373,528.67 HP (E15)/ JAM = ( G + P ) Concrete Mixer (350) I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Kode Pw Cp A W B

Harga

II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

Kode i U1 U2 Mb Ms Mp

Harga

20.0 350.00 5.0 2,000.0 12,000,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00

Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 12,000,000 Faktor Angsuran Modal =

Ins

Kode

0.2

Harga

C

1,200,000

D

0.26380

E

1,424.51

F

12.00

G

1,436.51

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (4.957.191-495.719,1)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*13.031.461 W 2000 BIAYA PASTI PER JAM = ( E + F ) =1.546,95 + 1559,98 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 20 x 6.548,35

H

32,880.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 20 x 18000

I

20,000

J

525.000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 4.957.191 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 4.957.191 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 750.0 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 72,530.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 73,966.51 HP (E47)/ JAM = ( G + P ) Three Wheel Roller 6-8 T I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Kode Pw Cp A W B

Harga 55.0 8.00 5.0 2,000.0 247,312,000

II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 247,312,000 Faktor Angsuran Modal =

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

24,731,200

D

0.26380

E

29,358.13

F

247.31

G

29,605.44

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (247.312.360-24.731.236.0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*13.031.461 W 2000 BIAYA PASTI PER JAM = ( E + F ) =1.546,95 + 1559,98 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 55 x 6.548,35

H

90,420.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 55 x 18000

I

55,000

J

10819.900

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 247.312.360 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 247.312.360 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 15,457.0 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 190,071.90 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 219,677.34 HP (E16)/ JAM = ( G + P )

Jack Hammer I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 9,784,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

1,330.00 5.0 2,000.0 9,784,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

978,400

D

0.26380

E

1,161.45

F

9.78

G

1,171.23

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (9.784.270-978.427.0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*13.031.461 W 2000 BIAYA PASTI PER JAM = ( E + F ) =1.546,95 + 1559,98 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 55 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 55 x 18000

I

-

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 9.784.270 : 2.000 = (12,5 % - 17,5 %) x B / W

J

428.050

K

611.5

Perawatan dan

perbaikan = 12,5 % x 9.784.270 : 2.000 Operator = (1 Orang / Jam ) x U1 L 9,250.00 Pembantu Operator = (1 Orang / Jam ) x U2 M 9,125.00 Biaya Operasi per Jam = (H + I + J + K + L + M) P 19,414.55 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 20,585.78 HP (E26)/ JAM = ( G + P )

VIBRO ROLLER I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 85,500,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

82.0 7.10 5.0 2,000.0 85,500,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

8,550,000

D

0.26380

E

10,149.61

F

85.50

G

10,235.11

i x (l + i)ᴬ (l + i)ᴬ - 1 =

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

(B - C ) x D W (85.500.000-8.550.000.0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*85.500.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =10.149,61 + 85,50 IV. Uraian

BIAYA OPERASI PER JAM KERJA Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 82 x 6.548,35

H

134,808.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x82 x 18000

I

82,000

J

3740.625

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 85.500.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 85.500.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 5,343.8 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 244,267.38 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 254,502.48 HP (E194)/ JAM = ( G + P ) Water tanker3000-4500 L. I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 165,106,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

100.0 4,000.00 5.0 2,000.0 165,106,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

16,510,600

D

0.26380

E

19,599.55

i x (l + i)ᴬ (l + i)ᴬ - 1 =

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

(B - C ) x D W (165.106.300-16.510.630,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*165.106.300 W 2000 BIAYA PASTI PER JAM = ( E + F ) =10.149,61 + 85,50 IV.

F

165.11

G

19,764.65

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 100 x 6.548,35

H

164,400.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x100 x 18000

I

100,000

J

7223.388

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 165.106.300 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 165.106.300 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 10,319.1 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 300,317.51 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 320,082.16 HP (E23)/ JAM = ( G + P ) Tandem Roller 6-8 T. I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 370,940,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

C i x (l + i)ᴬ (l + i)ᴬ - 1

82.0 8.10 5.0 2,000.0 370,940,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

37,094,000

=

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (370.940.449-37.094.044,9)*0,2638 2000

D

0.26380

E

44,033.87

F

370.94

G

44,404.81

b. Asuransi, dll = Ins x B = 0,002*370.940.449 W 2000 BIAYA PASTI PER JAM = ( E + F ) =10.149,61 + 85,50 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 82 x 6.548,35

H

134,808.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x82 x 18000

I

82,000

J

16228.625

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 370.940.449 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 370.940.449 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 23,183.8 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 274,595.38 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 319,000.18 HP (E17)/ JAM = ( G + P ) Truk Mixer ( agiator ) I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

100.5 9.00 5.0 2,000.0 257,876,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 257,876,000 Faktor Angsuran Modal =

Kode

Harga

C

25,787,600

D

0.26380

E

30,612.17

F

257.88

G

30,870.04

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (257.876.000-25.787.600,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =30.612,17 + 257,88 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 100,5 x 6.548,35

H

165,222.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x100,5 x 18000

I

100,500

J

11282.075

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 257.876.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 257.876.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 16,117.3 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 311,496.33 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 342,366.37 HP (E49)/ JAM = ( G + P ) Concrete Vibrator I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II.

LAIN-LAIN

Kode Pw Cp A W B

Harga 5.5 25.00 5.0 2,000.0 8,151,000

Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 8,151,000 Faktor Angsuran Modal =

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

815,100

D

0.26380

E

967.60

F

8.15

G

975.75

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (8.151.685-815.168,5)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*370.940.449 W 2000 BIAYA PASTI PER JAM = ( E + F ) =10.149,61 + 85,50 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 5,5 x 6.548,35

H

9,042.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x5,5 x 18000

I

5,500

J

356.606

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 8.151.685 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 8.151.685 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 509.4 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 33,783.04 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 34,758.79 HP (E20)/ JAM = ( G + P )

Stone Crusher

I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 908,803,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

220.0 50.00 5.0 2,000.0 908,803,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

90,880,300

D

0.26380

E

107,882.97

F

908.80

G

108,791.78

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (908.803.371-90.880.337,1)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*908.803.371 W 2000 BIAYA PASTI PER JAM = ( E + F ) =107.883,02 + 908,8 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

361,680.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 220 x 18000

I

220,000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 908.803.371 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 908.803.371 : 2.000

J

39760.131

K

56,800.2

Perawatan dan perbaikan

Operator = (1 Orang / Jam ) x U1 L 9,250.00 Pembantu Operator = (1 Orang / Jam ) x U2 M 9,125.00 Biaya Operasi per Jam = (H + I + J + K + L + M) P 696,615.32 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 805,407.10 HP (E21)/ JAM = ( G + P )

Water Pump 70-100 Mm I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 8,259,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

6.0 5.0 2,000.0 8,259,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

825,900

D

0.26380

E

980.42

F

8.26

G

988.68

i x (l + i)ᴬ (l + i)ᴬ - 1 =

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

(B - C ) x D W (8.259.551-825.955,1)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*8.259.551 W 2000 BIAYA PASTI PER JAM = ( E + F ) =980,48 + 8,26 IV. Uraian

BIAYA OPERASI PER JAM KERJA Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 6 x 6.548,35

H

9,864.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 6 x 18000

I

6,000

J

361.331

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 8.259.551 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 8.259.551 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 516.2 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 35,116.52 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 36,105.19 HP (E22)/ JAM = ( G + P )

Concrete pump I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 950,000,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

100.0 8.00 5.0 2,000.0 950,000,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

95,000,000

D

0.26380

E

112,773.42

i x (l + i)ᴬ (l + i)ᴬ - 1 =

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

(B - C ) x D W (950.000.000-95.000.000,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*950.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =112.773,42 + 950 IV.

F

950.00

G

113,723.42

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 100 x 6.548,35

H

164,400.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x 100 x 18000)

I

100,000

J

41562.500

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 950.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 950.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 59,375.0 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 383,712.50 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 497,435.92 HP (E28)/ JAM = ( G + P )

Truk Mixer ( agiator ) I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 305,000,000 Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

C i x (l + i)ᴬ (l + i)ᴬ - 1

220.0 5.00 5.0 2,000.0 305,000,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

30,500,000

=

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

D

0.26380

E

36,206.20

F

305.00

G

36,511.20

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

361,680.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

220,000

J

13343.750

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 19,062.5 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 632,461.25 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 668,972.45 HP (E49.a)/ JAM = ( G + P )

Aggregat (chip) Spreader I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

115.0 3.50 5.0 2,000.0 294,950,000

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 294,950,000 Faktor Angsuran Modal =

Kode

Harga

C

29,495,000

D

0.26380

E

35,013.18

F

294.95

G

35,308.13

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

189,060.00

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

115,000

J

12904.063

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 18,434.4 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 353,773.44 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 389,081.57 HP (E40)/ JAM = ( G + P ) Tire Roller 8-10 T. I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Kode Pw Cp A W B

Harga

II. Uraian

Kode

Harga

5.0 2,000.0 257,876,000

LAIN-LAIN

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x 257,876,000 Faktor Angsuran Modal =

i U1 U2 Mb Ms Mp Ins

Kode

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

Harga

C

25,787,600

D

0.26380

E

30,612.17

F

257.88

G

30,870.04

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

J

11282.075

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K 16,117.3 perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 45,774.33 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 76,644.37 HP (E18)/ JAM = ( G + P ) Vibratory Roller 5-8 T. I. URAIAN PERALATAN Uraian

Kode

Harga

Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x Faktor Angsuran Modal =

5.0 2,000.0 -

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

-

D

0.26380

E

-

F

-

G

-

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

J

.000

K

-

L M P

9,250.00 9,125.00 18,375.00

Biaya bengkel Perawatan dan perbaikan Operator Pembantu Operator Biaya Operasi per Jam

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 18,375.00 HP (E19)/ JAM = ( G + P ) Fulvi Mixer I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

5.0 2,000.0 -

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

-

D

0.26380

E

-

F

-

G

-

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

J

.000

Perawatan dan K perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 18,375.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 18,375.00 HP (E27)/ JAM = ( G + P ) Trailer 20 Ton I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

5.0 2,000.0 -

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

-

D

0.26380

E

-

F

-

G

-

i x (l + i)ᴬ (l + i)ᴬ - 1 =

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

J

.000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 18,375.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 18,375.00 HP (E29)/ JAM = ( G + P ) Pile Driver + Hammer I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

5.0 2,000.0 -

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

-

D

0.26380

E

-

i x (l + i)ᴬ (l + i)ᴬ - 1 =

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638

2000 b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

F

-

G

-

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

J

.000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K perbaikan Operator L 7,400.00 Pembantu Operator M 13,700.00 Biaya Operasi per Jam P 21,100.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 21,100.00 HP (E30)/ JAM = ( G + P ) Crane On Track 35 Ton I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

C i x (l + i)ᴬ (l + i)ᴬ - 1

5.0 2,000.0 -

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

-

=

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

D

0.26380

E

-

F

-

G

-

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

J

.000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 18,375.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 18,375.00 HP (E31)/ JAM = ( G + P ) Welding Set I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

5.0 2,000.0 -

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x Faktor Angsuran Modal =

Kode

Harga

C

-

D

0.26380

E

-

F

-

G

-

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

J

.000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 18,375.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 18,375.00 HP (E32)/ JAM = ( G + P ) Bore Pile Machine I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Kode Pw Cp A W B

Harga

II. LAIN-LAIN Uraian Tingkat Suku Bunga

Kode i

Harga

5.0 2,000.0 -

10.00

Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x Faktor Angsuran Modal =

U1 U2 Mb Ms Mp Ins

Kode

9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

Harga

C

-

D

0.26380

E

-

F

-

G

-

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

J

.000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 18,375.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 18,375.00 HP (E33)/ JAM = ( G + P ) Asphalt Liquid Mixer I. URAIAN PERALATAN Uraian Tenaga

Kode Pw

Harga -

Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Cp A W B

II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x Faktor Angsuran Modal =

5.0 2,000.0 -

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

-

D

0.26380

E

-

F

-

G

-

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

J

.000

K

-

L M P

9,250.00 9,125.00 18,375.00

Biaya bengkel Perawatan dan perbaikan Operator Pembantu Operator Biaya Operasi per Jam Catatan :

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 18,375.00 HP (E34)/ JAM = ( G + P ) Tronton I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

5.0 2,000.0 -

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

-

D

0.26380

E

-

F

-

G

-

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

J

.000

Perawatan dan K perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 18,375.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 18,375.00 HP (E35)/ JAM = ( G + P ) Cold Milling I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

5.0 2,000.0 -

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

-

D

0.26380

E

-

F

-

G

-

i x (l + i)ᴬ (l + i)ᴬ - 1 =

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

J

.000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 18,375.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 18,375.00 HP (E36)/ JAM = ( G + P ) Rock Drill Breaker I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

5.0 2,000.0 -

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

-

D

0.26380

E

-

i x (l + i)ᴬ (l + i)ᴬ - 1 =

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

F

-

G

-

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

J

.000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 18,375.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 18,375.00 HP (E37)/ JAM = ( G + P ) Cold Recycler I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x Faktor Angsuran Modal =

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

Kode

Harga

5.0 2,000.0 -

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

C

-

D

0.26380

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵

(1+0,1)⁵ -1 Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

E

-

F

-

G

-

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

J

.000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 18,375.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 18,375.00 HP (E38)/ JAM = ( G + P ) Hot Recycler I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III.

BIAYA PASTI PER JAM KERJA

Kode Pw Cp A W B

Harga

Kode i U1 U2 Mb Ms Mp Ins

Harga

5.0 2,000.0 -

10.00 9,250.00 9,125.00 7,400.00 13,700.00 40,000.00 0.2

Uraian Nilai Sisa Alat = 10 % x B = 0,1 x -

Kode

Faktor Angsuran Modal =

Harga

C

-

D

0.26380

E

-

F

-

G

-

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

J

.000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 18,375.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 18,375.00 HP (E39)/ JAM = ( G + P ) Hot Recycler I. URAIAN PERALATAN Uraian Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Kode Pw Cp A W B

Harga

II. LAIN-LAIN Uraian Tingkat Suku Bunga Upah Operator / Sopir

Kode i U1

Harga

5.0 2,000.0 -

10.00 9,250.00

Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas Asuransi dan lain-lain PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan III. BIAYA PASTI PER JAM KERJA Uraian Nilai Sisa Alat = 10 % x B = 0,1 x Faktor Angsuran Modal =

U2 Mb Ms Mp Ins

Kode

9,125.00 7,400.00 13,700.00 40,000.00 0.2

Harga

C

-

D

0.26380

E

-

F

-

G

-

i x (l + i)ᴬ (l + i)ᴬ - 1 =

0,1 x (1+0,1)⁵ (1+0,1)⁵ -1

Biaya Pasti per Jam : a. Biaya Pengembalian Modal = = =

(B - C ) x D W (305.000.000-30.500.000,0)*0,2638 2000

b. Asuransi, dll = Ins x B = 0,002*305.000.000 W 2000 BIAYA PASTI PER JAM = ( E + F ) =36.206,20 +305,00 IV.

BIAYA OPERASI PER JAM KERJA

Uraian

Kode

Harga

Bahan Bakar

= (12%-15%) x Pw x Ms = 12% x 220 x 6.548,35

H

-

Pelumas

= (2.5%-3%) x Pw x Mp =( 2,5% x220 x 18000

I

-

J

.000

Biaya bengkel

= (6.25% dan 8.75%) x B / W = 8,75% x 305.000.000 : 2.000 = (12,5 % - 17,5 %) x B / W = 12,5 % x 305.000.000 : 2.000 = (1 Orang / Jam ) x U1 = (1 Orang / Jam ) x U2 = (H + I + J + K + L + M)

Perawatan dan K perbaikan Operator L 9,250.00 Pembantu Operator M 9,125.00 Biaya Operasi per Jam P 18,375.00 Catatan : Rentang persentase penggunaan bahan bakar/pelumas, biaya bengkel, dan perawatan tergantung pada jumlah jam kerja dalam berat ringannya pekerjaan. Makin berat pekerjaan diambil nilai tertinggi. TOTAL BIAYA SEWA ALAT S 18,375.00 HP (E39)/ JAM = ( G + P )

*

Satuan HP m³ Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah Rupiah

Rupiah

Rupiah

Operator Telatih *) Pembantu Operator Sopir Material / Truk Pembantu Sopir / Kenek Solar ( Non subsidi ) Premium ( Non subsidi ) Pelumas

Rupiah

Satuan

1 hari

Keterangan

Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah

Satuan HP m³ Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m³ Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m³ Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m³ Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m³ Tahun Jam Rupiah

Keterangan

Satuan % / Tahun

Keterangan

./Jam ./Jam Liter Liter Liter %

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP

Keterangan

m³ Tahun Jam Rupiah

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada

Rupiah

Satuan HP T/jam Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan Rupiah

Rupiah

Keterangan

Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah

Satuan HP T/jam Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah

Satuan HP Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah

Satuan HP Liter Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah

Satuan HP Liter Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah

Satuan HP Liter Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah

Satuan HP m³ Tahun Jam Rupiah

Keterangan

Satuan

Keterangan

% / Tahun ./Jam ./Jam Liter Liter Liter %

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah

Satuan HP m³

Keterangan

Tahun Jam Rupiah

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada

Rupiah

Satuan HP ton Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan Rupiah

Rupiah

Keterangan

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP ton Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP ltr Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter

Keterangan

%

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP ton Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP ton Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan Rupiah

Rupiah

Rupiah Rupiah

Keterangan

Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP ton Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP liter Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP ton Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP ton Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP ton/jam Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan Rupiah

Rupiah

Rupiah Rupiah

Keterangan

Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan

Keterangan

% / Tahun ./Jam ./Jam Liter Liter Liter %

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan

Keterangan

HP m3 Tahun Jam Rupiah

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

Keterangan

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan Rupiah

Rupiah

Keterangan

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun

Keterangan

./Jam ./Jam Liter Liter Liter %

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP

Keterangan

m3 Tahun Jam Rupiah

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

Keterangan

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan Rupiah

Rupiah

Keterangan

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam ./Jam Liter Liter Liter %

Keterangan

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

Satuan HP m3 Tahun Jam Rupiah

Keterangan

Satuan % / Tahun ./Jam

Keterangan

./Jam Liter Liter Liter %

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah

Satuan

Keterangan

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

a jumlah jam kerja dalam satu tahun, dan tergantung pada Rupiah

8

jam

74,000.00 73,000.00 73,000.00 67,000.00

hari

13,700.00 7,400.00 40,000.00

9,250.00 9,125.00 9,125.00 8,375.00

jam jam jam jam

T.06b No A

1 m3 galian tanah biasa sedalam s.d 2 m Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan

Koefisien

OH OH

Harga Satuan

0.6750 Rp 0.0675 Rp

57,400.00 Rp 85,800.00 Rp

Jumlah harga 38,745.00 5,791.50

Jumlah Harga Tenaga Kerja B

Bahan

C

Peralatn

Jumlah Harga Bahan Jumlah Harga Peralatan D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

T.14a No A

13 X D

1 m3 urugan tanah kembali (1 m3) Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan

Koefisien

OH OH

Harga Satuan

0.3300 Rp 0.0330 Rp

57,400.00 Rp 85,800.00 Rp

Jumlah harga 18,942.00 2,831.40

Jumlah Harga Tenaga Kerja B

Bahan Jumlah Harga Bahan

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

P.07b

1 m panjang cerucuk bambu diameter 8 cm - 10 cm

Jumlah Harga Peralatan

No A

B

Uraian Tenaga Pekerja Mandor Operator Tripod *)

Kode

Bahan bambu dia. 8 cm -10 cm

C

13 X D

Satuan

Koefisien

Harga Satuan

Jumlah harga

OH OH OH

0.036 Rp 57,400.00 Rp 0.004 Rp 85,800.00 Rp 0.006 Rp - Rp Jumlah Harga Tenaga Kerja

2,066.40 343.20 -

m'

3,250.00 Rp 1.05 Rp Jumlah Harga Bahan

3,412.50

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

T.14c

1 m3 Timbunan pasir sebagai bahan pengisi (1 m3)

No

B

Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Bahan pasir Urug

M.14.b

13 X D

Satuan OH OH

Koefisien

Harga Satuan

0.4000 Rp 57,400.00 Rp 0.0400 Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

117,000.00 Rp 1.2 Rp Jumlah Harga Bahan

Jumlah harga 22,960.00 3,432.00

140,400.00

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.03 b) molen No A

1 m3 beton mutu, f'c = 9,8 Mpac(K125), slump (12 ± 2) cm, w/c = 0,78

Jumlah Harga Peralatan

B

C

Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

Peralatan Molen

E.28.b

sewa hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

A.3.2.1.9

1 m3 batu kosong (anstamping)

No A

B

Uraian Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

Kode L.01 L.02 L.03 L.04

Bahan Batu Belah Pasir urug

Koefisien 1.323 0.189 0.019 0.132

Jumlah harga

Harga Satuan Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja Rp Rp Rp Rp

396,888.00 208,478.57 154,667.33 10,750.00

73,966.51 Rp 0.250 Rp Jumlah Harga Peralatan

18,491.63

276 828 1012 215

Rp 1,438.00 Rp 251.79 Rp 152.83 Rp 50.00 Jumlah Harga Bahan

75,940.20 13,230.00 1,425.00 11,325.60

13 X D

Satuan OH OH OH OH

m3 m3

Koefisien 0.7800 0.3900 0.0390 0.0390

Harga Satuan Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

1.200 Rp 0.432 Rp

251,300.00 Rp 117,000.00 Rp

Jumlah Harga Bahan C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Jumlah Harga Peralatan

13 X D

Jumlah harga 44,772.00 27,300.00 2,925.00 3,346.20

301,560.00 50,544.00

B.051 b) molen No A

B

C

1 m3 beton mutu, f'c = 14,5 Mpac(K175), slump (12 ± 2) cm, w/c = 0,66 Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

Peralatan Molen

E.28.b

sewa hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.17

Pembesian 100 kg dengan besi polos atau ulir No

A

B

Uraian Tenaga Pekerja Tukang besi Kepala Tukang Mandor Bahan Besi beton/ulir Kawat ikat

C

Koefisien

Jumlah harga

Harga Satuan

1.323 0.189 0.019 0.132

Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja Rp Rp Rp Rp

468,788.00 191,357.14 157,265.50 10,750.00

73,966.51 Rp 0.250 Rp Jumlah Harga Peralatan

18,491.63

326 760 1029 215

Rp 1,438.00 Rp 251.79 Rp 152.83 Rp 50.00 Jumlah Harga Bahan

75,940.20 13,230.00 1,425.00 11,325.60

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

M.55.d M.60

kg kg

Koefisien

Harga Satuan

0.700 0.700 0.070 0.070

Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

10,700.00 Rp 105 Rp 17,800.00 Rp 1.5 Rp Jumlah Harga Bahan

Jumlah harga 40,180.00 49,000.00 5,250.00 6,006.00

1,123,500.00 26,700.00

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-100 kg (D+E)

P.01c

1 m3 Pasangan Batu Campuran 1 PC : 4 PP No

A

Uraian Tenaga Pekerja Tukang

Kode

13 X D

Satuan OH OH

Koefisien 2.7000 Rp 0.9000 Rp

Harga Satuan 57,400.00 Rp 70,000.00 Rp

Jumlah harga 154,980.00 63,000.00

B

C

Kepala Tukang Mandor

OH OH

0.0900 Rp 75,000.00 Rp 0.2700 Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

6,750.00 23,166.00

Bahan Batu Belah 15/20 Pasir Beton Semen

m3 m3 kg

251,300.00 Rp 1.200 Rp 352,500.00 Rp 0.520 Rp 1,438.00 Rp 163 Rp Jumlah Harga Bahan

301,560.00 183,300.00 234,394.00

73,966.51 Rp 0.167 Rp Jumlah Harga Peralatan

12,352.41

Peralatan Molen (sewa-hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

13 X D

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm No Uraian Kode Satuan Koefisien A

B

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

L.01 L.03 L.03 L.04

Bahan PC PP

OH OH OH OH

Kg m3

C

Peralatan

D E F

Jumlah (A+B+C) Overhead & Profit ( 13 %) Harga Satuan Pekerjaan (D+E)

Harga Satuan

Jumlah Harga

0.3 0.15 0.015 0.015

57,400.00 70,000.00 75,000.00 85,800.00 Jumlah Harga Tenaga Kerja

5.184 0.026

1,438.00 352,500.00 Jumlah Harga Bahan

17,220.00 10,500.00 1,125.00 1,287.00

7,454.59 9,165.00

Jumlah Harga Peralatan

B.21

13% x D

D

1 m2 bekisting u/ permukaan beton biasa dgn multiflex 12 mm atau 18 mm (tanpa perancah) Uraian Kode Jumlah harga Satuan Koefisien Harga Satuan Tenaga Pekerja L.01 OH 0.200 Rp 57,400.00 Rp 11,480.00 Tukang kayu L.02 OH 0.600 Rp 70,000.00 Rp 42,000.00 Kepala Tukang L.03 OH 0.060 Rp 75,000.00 Rp 4,500.00 Mandor L.04 OH 0.020 Rp 85,800.00 Rp 1,716.00 Jumlah Harga Tenaga Kerja Bahan lbr 160,000.00 Rp 56,000.00 Multiflex 18 mm M.38.d 0.35 Rp m3 2,000,000.00 Rp 40,000.00 Kaso 5/7 kelas III M.33.d 0.02 Rp kg 15,500.00 Rp 3,875.00 Paku 5 & 7 cm M.65.b 0.25 Rp L 10,300.00 Rp 2,060.00 myk bekisting M.129 0.20 Rp Jumlah Harga Bahan Peralatan Jumlah Harga Peralatan Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m 2 (D+E)

No A

B

C

13 X D

Dihit. Pekerjaan Pengurugan 1 m3 dengan PADAS No A. 1

Uraian TENAGA Pekerja

Kode

Satuan OH

Koefisien 0.3000

Harga Satuan (Rp) 57,400.00

Jumlah Harga (Rp) 17,220.00

2

Mandor

OH

0.0100

85,800.00 Jumlah Harga Tenaga Kerja

B. 1

BAHAN Bahan timbunan ( PADAS )

m3

1.2000

115,000.00 Jumlah Harga Bahan

C.

PERALATAN

858.00

138,000.00

Jumlah Harga Peralatan D. E. F. B.07 b) molen No A

B

C

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E ) 1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

Peralatan Molen

E.28.b

sewa hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E) A.3.2.1.4 No A

B

C

B

Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja Rp Rp Rp Rp

533,498.00 175,746.43 160,016.50 10,750.00

73,966.51 Rp 0.250 Rp Jumlah Harga Peralatan

18,491.63

371 698 1047 215

Rp 1,438.00 Rp 251.79 Rp 152.83 Rp 50.00 Jumlah Harga Bahan

75,940.20 13,230.00 1,425.00 11,325.60

1 m3 Pasangan Batu Campuran 1 PC : 6 PS Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Kode

Satuan OH OH OH OH

Bahan Batu Belah 15/20 Pasir Beton Semen

m3 m3 kg

Peralatan Molen (sewa-hari Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

No A

1.323 0.189 0.019 0.132

Jumlah harga

Harga Satuan

13 X D

D

1.6,14

Koefisien

Koefisien 1.5000 0.7500 0.0750 0.0750

Harga Satuan Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

Jumlah harga 86,100.00 52,500.00 5,625.00 6,435.00

251,300.00 Rp 1.200 Rp 352,500.00 Rp 0.561 Rp 1,438.00 Rp 117 Rp Jumlah Harga Bahan

301,560.00 197,752.50 168,246.00

69,886.51 Rp 0.167 Rp Jumlah Harga Peralatan

11,671.05

13 X D

1,0000 m2 pengecat tembok baru ( 1 lap. Plamir, 1 lap cat dasar 2 lap. Cat penutup Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor Bahan

Kode

Satuan OH OH OH OH

Koefisien 0.0200 0.0630 0.0063 0.0025

Harga Hatuan Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

Jumlah harga 1,148.00 4,410.00 472.50 214.50

kg kg kg

Plamir cat dasar cat penutup 2 kali C

Peralatan

D

Jumlah A+B+C

1.6,23

1,0000 m1 memasang 1 m pipa galvanis Ø 2 1/2"

13,300.00 Rp 0.1000 Rp 25,400.00 Rp 0.1000 Rp 25,400.00 Rp 0.2600 Rp Jumlah Harga Bahan

1,330.00 2,540.00 6,604.00

Jumlah Harga Peralatan

No A

B

Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Kode

Bahan pipa galvanis perlengkapan 35 % harga pipa

Satuan OH OH OH OH

m'

Koefisien 0.1080 0.1800 0.0180 0.0054

Harga Hatuan Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

1.2000 Rp 0.3500 Rp

130,833.33 Rp 45,791.67 Rp

Jumlah Harga Bahan C

Peralatan

D

Jumlah A+B+C

Jumlah Harga Peralatan

Jumlah harga 6,199.20 12,600.00 1,350.00 463.32

157,000.00 16,027.08

T.06b No A

1 m3 galian tanah biasa sedalam s.d 2 m Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan OH OH

Koefisien

Jumlah harga

Harga Satuan

0.6750 0.0675

-

-

Jumlah Harga Tenaga Kerja B

Bahan

C

Peralatn

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Jumlah Harga Bahan Jumlah Harga Peralatan

T.14a No A

13 X D

1 m3 urugan tanah kembali (1 m3) Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan OH OH

Koefisien 0.3300 0.0330

Jumlah harga

Harga Satuan Jumlah Harga Tenaga Kerja

B

Bahan

C

Peralatan

Jumlah Harga Bahan Jumlah Harga Peralatan

-

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

P.07b

1 m panjang cerucuk bambu diameter 8 cm - 10 cm

No A

B

Uraian Tenaga Pekerja Mandor Operator Tripod *)

13 X D

Kode

Bahan bambu dia. 8 cm -10 cm

Satuan

Koefisien

OH OH OH

0.036 0.004 0.006

m'

1.05

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

T.14c

1 m3 Timbunan pasir sebagai bahan pengisi (1 m3)

Jumlah harga

Harga Satuan Jumlah Harga Tenaga Kerja

-

Jumlah Harga Bahan

-

Jumlah Harga Peralatan

No

B

13 X D

Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Bahan pasir Urug

M.14.b

Satuan OH OH

Koefisien

Jumlah harga

Harga Satuan

0.4000 0.0400

1.2

Jumlah Harga Tenaga Kerja

-

Jumlah Harga Bahan

-

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.03 b) molen No A

1 m3 beton mutu, f'c = 9,8 Mpac(K125), slump (12 ± 2) cm, w/c = 0,78

Jumlah Harga Peralatan

B

Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Semen Pasir beton/PB

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

M.15 M.14.a

kg kg

Koefisien

Jumlah harga

Harga Satuan

1.323 0.189 0.019 0.132

276 828

Jumlah Harga Tenaga Kerja -

-

-

C

Krikil/Kr Air

M.12 M.02

kg L

1012 215

Jumlah Harga Bahan

-

Peralatan Molen

E.28.b

sewa hari

0.250

Jumlah Harga Peralatan

-

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

A.3.2.1.9

1 m3 batu kosong (anstamping)

No A

B

Uraian Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

13 X D

Kode L.01 L.02 L.03 L.04

Satuan OH OH OH OH

Bahan Batu Belah Pasir urug

m3 m3

Koefisien 0.7800 0.3900 0.0390 0.0390

Jumlah harga

Harga Satuan Jumlah Harga Tenaga Kerja

-

-

1.200 0.432

-

Jumlah Harga Bahan C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.051 b) molen No A

1 m3 beton mutu, f'c = 14,5 Mpac(K175), slump (12 ± 2) cm, w/c = 0,66

Jumlah Harga Peralatan

B

C

Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

Peralatan Molen

E.28.b

sewa hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Koefisien 1.323 0.189 0.019 0.132

Harga Satuan

Jumlah harga

Jumlah Harga Tenaga Kerja

-

326 760 1029 215

Jumlah Harga Bahan

-

0.250

Jumlah Harga Peralatan

-

13 X D

B.17

Pembesian 100 kg dengan besi polos atau ulir No

A

B

Uraian Tenaga Pekerja Tukang besi Kepala Tukang Mandor Bahan Besi beton/ulir Kawat ikat

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

M.55.d M.60

kg kg

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-100 kg (D+E)

P.01c

1 m3 Pasangan Batu Campuran 1 PC : 4 PP

Koefisien

Harga Satuan

0.700 0.700 0.070 0.070

105 1.5

Jumlah harga

Jumlah Harga Tenaga Kerja

-

Jumlah Harga Bahan

-

Jumlah Harga Peralatan

No A

B

Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Kode

13 X D

Satuan OH OH OH OH

Bahan Batu Belah 15/20 Pasir Beton Semen

C

m3 m3 kg

Peralatan Molen (sewa-hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Koefisien 2.7000 0.9000 0.0900 0.2700

B

C

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Bahan PC PP

L.01 L.03 L.03 L.04

Jumlah harga

Jumlah Harga Tenaga Kerja

-

1.200 0.520 163

Jumlah Harga Bahan

-

0.167

Jumlah Harga Peralatan

-

13 X D

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm No Uraian Kode Satuan Koefisien A

Harga Satuan

OH OH OH OH

Kg m3

Harga Satuan

Jumlah Harga

0.3 0.15 0.015 0.015

Jumlah Harga Tenaga Kerja

-

5.184 0.026

Jumlah Harga Bahan

-

Peralatan Jumlah Harga Peralatan

D E F B.21

Jumlah (A+B+C) Overhead & Profit ( 13 %) Harga Satuan Pekerjaan (D+E)

13% x D

D

1 m2 bekisting u/ permukaan beton biasa dgn multiflex 12 mm atau 18 mm (tanpa perancah) Uraian Kode Jumlah harga Satuan Koefisien Harga Satuan Tenaga Pekerja L.01 OH 0.200 Tukang kayu L.02 OH 0.600 Kepala Tukang L.03 OH 0.060 Mandor L.04 OH 0.020 Jumlah Harga Tenaga Kerja Bahan lbr Multiflex 18 mm M.38.d 0.35 m3 Kaso 5/7 kelas III M.33.d 0.02 kg Paku 5 & 7 cm M.65.b 0.25 L myk bekisting M.129 0.20 Jumlah Harga Bahan Peralatan Jumlah Harga Peralatan Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m 2 (D+E)

No A

B

C

-

-

13 X D

Dihit. Pekerjaan Pengurugan 1 m3 dengan PADAS No A. 1 2

Uraian TENAGA Pekerja Mandor

Kode

B. 1

BAHAN Bahan timbunan ( PADAS )

C.

PERALATAN

Satuan

Koefisien

Harga Satuan (Rp)

Jumlah Harga (Rp)

OH OH

0.3000 0.0100

Jumlah Harga Tenaga Kerja

-

m3

1.2000

Jumlah Harga Bahan

-

Jumlah Harga Peralatan D. E. F. B.07 b) molen No A

B

C

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E ) 1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

Peralatan Molen

E.28.b

sewa hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

Koefisien 1.323 0.189 0.019 0.132

Harga Satuan

Jumlah harga

Jumlah Harga Tenaga Kerja

-

371 698 1047 215

Jumlah Harga Bahan

-

0.250

Jumlah Harga Peralatan

-

13 X D

F

Harga Satuan Pekerjaan per-m3 (D+E) A.3.2.1.4 No A

B

C

1 m3 Pasangan Batu Campuran 1 PC : 6 PS Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Kode

Satuan OH OH OH OH

Bahan Batu Belah 15/20 Pasir Beton Semen

m3 m3 kg

Peralatan Molen (sewa-hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

1.6,14 No A

B

Koefisien 1.5000 0.7500 0.0750 0.0750

Jumlah harga

Harga Satuan Jumlah Harga Tenaga Kerja

-

1.200 0.561 117

Jumlah Harga Bahan

-

0.167

Jumlah Harga Peralatan

-

13 X D

1,0000 m2 pengecat tembok baru ( 1 lap. Plamir, 1 lap cat dasar 2 lap. Cat penutup Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Kode

Satuan OH OH OH OH

Bahan Plamir cat dasar cat penutup 2 kali

kg kg kg

C

Peralatan

D

Jumlah A+B+C

1.6,23

1,0000 m1 memasang 1 m pipa galvanis Ø 2 1/2"

Koefisien 0.0200 0.0630 0.0063 0.0025

0.1000 0.1000 0.2600

Jumlah harga

Harga Hatuan Jumlah Harga Tenaga Kerja

-

Jumlah Harga Bahan

-

Jumlah Harga Peralatan

No A

B

Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Kode

Bahan pipa galvanis perlengkapan 35 % harga pipa

Satuan OH OH OH OH

m'

Koefisien 0.1080 0.1800 0.0180 0.0054

1.2000 0.3500

Jumlah harga

Harga Hatuan Jumlah Harga Tenaga Kerja Jumlah Harga Bahan

C

Peralatan

D

Jumlah A+B+C

Jumlah Harga Peralatan

-

-

Jumlah Total

Rp

44,536.50

Rp

44,536.50

Rp

5,789.75

Rp

50,326.25

Jumlah Total

Rp

21,773.40

Rp

21,773.40

Rp

2,830.54

Rp

24,603.94

Jumlah Total

Rp

2,409.60

Rp

3,412.50

Rp Rp

5,822.10

Rp

756.87

Rp

6,578.97

Jumlah Total

Rp

26,392.00

Rp

140,400.00

Rp Rp

166,792.00

Rp

21,682.96

Rp

188,474.96

Jumlah Total

Rp

101,920.80

Rp

770,783.90

Rp Rp

18,491.63 891,196.33

Rp

115,855.52

Rp

1,007,051.85

Jumlah Total

Rp

78,343.20

Rp

352,104.00

Rp Rp

430,447.20

Rp

55,958.14

Rp

486,405.34

Jumlah Total

Rp

101,920.80

Rp

828,160.64

Rp Rp

18,491.63 948,573.07

Rp

123,314.50

Rp

1,071,887.57

Jumlah Total

Rp

100,436.00

Rp

1,150,200.00

Rp Rp

1,250,636.00

Rp

162,582.68

Rp

1,413,218.68

Jumlah Total

Rp

247,896.00

Rp

719,254.00

Rp Rp

12,352.41 979,502.41

Rp

127,335.31

Rp

1,106,837.72

Jumlah Total

30,132.00

16,619.59

46,751.59 6,077.71 52,829.30

Jumlah Total

Rp

59,696.00

Rp

101,935.00

Rp Rp

161,631.00

Rp

21,012.03

Rp

182,643.03

Jumlah Total (Rp)

18,078.00

138,000.00

156,078.00 20,290.14 176,368.14

Jumlah Total

Rp

101,920.80

Rp

880,010.93

Rp Rp

18,491.63 1,000,423.36

Rp

130,055.04

Rp

1,130,478.39

Jumlah Total

Rp

150,660.00

Rp

667,558.50

Rp Rp

11,671.05 829,889.55

Rp

107,885.64

Rp

937,775.19

Jumlah Total

Rp

6,245.00

Rp

10,474.00

Rp

16,719.00

Jumlah Total

Rp

20,612.52

Rp

173,027.08

Rp

193,639.60

Jumlah Total

-

-

Jumlah Total

-

-

Jumlah Total

-

-

Jumlah Total

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

Jumlah Total (Rp)

-

-

-

Jumlah Total

-

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak TEMPAT PEKERJAAN 1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten No 1 I

II

: : Brambang : Karangawen : Demak Uraian Pekerjaan

2 PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan

Kegiatan APBD Perubahan Kabupaten Demak Tahun 2015 Volume

Analis

3

4

Harga Satuan ( Rp. ) 5

Jumlah Harga ( Rp. ) 6

1.00 Ls 1.00 Ls 1.00 Ls

Taksir Taksir Taksir

600,000.00 700,000.00 250,000.00

600,000.00 700,000.00 250,000.00

59.28 m3 9.88 m3

T. 06b T. 14a

50,326.25 24,603.94

2,983,339.80 243,086.95

34.40 m' 1.14 m3 1.14 m3 6.84 m3 4.56 m3 38.15 m3 80.00 btg 62.46 m2

P. 07b T. 14c B. 03b A.3.2.1.9 B.051b P. 01c B.21

6,578.97 188,474.96 1,007,051.85 486,405.34 1,071,887.57 1,106,837.72 13,000.00 182,643.03

226,316.67 214,861.45 1,148,039.11 3,327,012.50 4,887,807.31 42,228,072.67 1,040,000.00 11,407,883.65

1137.98 kg 687.37 kg 78.78 kg 598.37 kg 11.63 kg 13.17 m3 2.57 m3 19.56 Kg 36.00 m' 8.00 buah 1.92 m3 21.12 m2 17.40 m3 21.12 m2

B.17 B.17 B.17 B.17 B.17 B. 07b B.051b 1,6,23 A.3.2.1.4 A.4.4.2.5 Dihit. 1.6,14

14,132.19 14,132.19 14,132.19 14,132.19 14,132.19 1,130,478.39 1,071,887.57 17,800.00 193,639.60 35,000.00 937,775.19 52,829.30 176,368.14 16,719.00

16,082,121.06 9,714,053.39 1,113,313.33 8,456,317.03 164,396.90 14,888,400.41 2,752,607.28 348,103.85 6,971,025.72 280,000.00 1,800,528.36 1,115,754.79 3,068,191.87 353,105.28

PEKERJAAN TANAH 1 Pekj. Galian Tanah 2 Pekj. Urugan kembali

II

Harga Perkiraan Sendiri (HPS) untuk : PEMBANGUNAN JEMBATAN DUKUH SOKO RW. 11 BRAMBANG KARANGAWEN

PEKERJAAN JEMBATAN 9 X 4 x 20 cm 1 Pekj. Pancang Cerucuk Bambu 2 Pekj. Urugan pasir Dasar 3 Pekj. Beton Nol (Non struktur K. 125) 4 Pekj. Anstamping 5 Pekj. Beton Plat Meja K. 175 6 Pekj. Pas. Batu belah 1Pc : 4Ps 7 Bambu Perancah 8 Pekj. Begisting Kayu 9 Pekj. Penulangan Beton - Pembesian Ø 22 mm - Pembesian Ø 12 mm - Pembesian Ø 10 mm - Pembesian Ø 8 mm - Pembesian Ø 6 mm 10 Pekj. Beton K.225 (Molen) 11 Pekj. Beton K.175 (molen) 12 Kawat Bendrat 13 Pekj. Pipa Galvanis Ø 2,5" x 6 m 14 Dop Tutup Pipa leuning 15 Pekj. Book Batu Belah 1Pc : 6 Ps 16 Pekj. Plesteran 1Pc : 5Ps tbl 15 mm 17 Pekj. Opritan Padas 18 Pekj Pengecatan

Jumlah PPN 10 % Jumlah Total Dibulatkan Terbilang :

: : : :

(Seratus Lima Puluh Juta Rupiah)

Demak,

2015

KASI PERTAMANAN DAN PEMAKAMA PADA BIDANG KEBERSIHAN DAN PJ DPU PPE KABUPATEN DEMAK SELAKU PEJABAT PEMBUAT KOMITMEN

ANDI ERWIN PRASETYO, ST NIP. 19720914 200312 1 002

KOP PERUSAHAAN BILL OF QUANTITY (BQ) TEMPAT PEKERJAAN 1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten No 1 I

II

: : Brambang : Karangawen : Demak Uraian Pekerjaan

2 PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan

Harga Perkiraan Sendiri (HPS) untuk : PEMBANGUNAN JEMBATAN DUKUH SOKO RW. 11 BRAMBANG KARANGAWEN Kegiatan APBD Perubahan Kabupaten Demak Tahun 2015 Volume

Analis

3

4

Harga Satuan ( Rp. ) 5

Jumlah Harga ( Rp. ) 6

1.00 Ls 1.00 Ls 1.00 Ls

Taksir Taksir Taksir

-

-

59.28 m3 9.88 m3

T. 06b T. 14a

-

-

PEKERJAAN TANAH 1 Pekj. Galian Tanah 2 Pekj. Urugan kembali

II

PEKERJAAN JEMBATAN 9 X 4 1 Pekj. Pancang Cerucuk Bambu 2 Pekj. Urugan pasir Dasar 3 Pekj. Beton Nol (Non struktur K. 125) 4 Pekj. Anstamping 5 Pekj. Beton Plat Meja K. 175 6 Pekj. Pas. Batu belah 1Pc : 4Ps 7 Bambu Perancah 8 Pekj. Begisting Kayu 9 Pekj. Penulangan Beton - Pembesian Ø 22 mm - Pembesian Ø 12 mm - Pembesian Ø 10 mm - Pembesian Ø 8 mm - Pembesian Ø 6 mm 10 Pekj. Beton K.225 (Molen) 11 Pekj. Beton K.175 (molen) 12 Kawat Bendrat 13 Pekj. Pipa Galvanis Ø 2,5" x 6 m 14 Dop Tutup Pipa leuning 15 Pekj. Book Batu Belah 1Pc : 6 Ps 16 Pekj. Plesteran 1Pc : 5Ps tbl 15 mm 17 Pekj. Opritan Padas 18 Pekj Pengecatan

34.40 m' 1.14 m3 1.14 m3 6.84 m3 4.56 m3 38.15 m3 80.00 btg 62.46 m2

P. 07b T. 14c B. 03b A.3.2.1.9 B.051b P. 01c B.21

-

-

1137.98 kg 687.37 kg 78.78 kg 598.37 kg 11.63 kg 13.17 m3 2.57 m3 19.56 Kg 36.00 m' 8.00 buah 1.92 m3 21.12 m2 17.40 m3 21.12 m2

B.17 B.17 B.17 B.17 B.17 B. 07b B.051b 1,6,23 A.3.2.1.4 A.4.4.2.5 Dihit. 1.6,14

-

-

Jumlah PPN 10 % Jumlah Total Dibulatkan Terbilang :

: : : :

( .................................................................... )

Demak,

2015

dibuat oleh PT. / CV ………………………………

…………………………….. DIREKTUR

DAN ENERGI ak

O RW. 11 BRAMBANG KEC.

PERHITUNGAN VOLUME PEKERJAAN JEMBATAN BETON : PEMBANGUNAN JEMBATAN DUKUH SOKO RW. 11 BRAMBANG KEC. KARANGAWEN Uk. 9,00 m x 4,00 m x 0,20 m I PEKERJAAN TANAH No Pekerjaan P L 1 Pekj. Galian Tanah 7.60 1.5 2 Pekj. Urugan kembali 7.60

T 2.6

mak Tahun 2015 Harga Total ( Rp. ) 7

1,550,000.00

II No

PEKERJAAN JEMBATAN 9 X 4 x 20 cm Pekerjaan 1 Pekj. Pancang Cerucuk Bambu

No

Hit =7,60/1+1

J1 8.60

Hit =1+1

Pekerjaan 2 Pekj. Urugan pasir Dasar

P 7.60

L 1.50

T 0.05

No

Pekerjaan 3 Pekj. Beton nol (beton non Struktur K.125)

P 7.60

L 1.50

T 0.05

No

Pekerjaan 4 Pekj. Anstamping

P 7.60

L 1.50

T 0.30

No

Pekerjaan 5 Pekj. Beton Plat Meja K.175 Penulangan Melintang 1 Ø 8 mm Melintang 2 Ø 8 mm Memanjang Ø 8 mm

P 7.60 Hit =0,07+0,14+1,44+0,14+1,44+0,07 =0,07+0,14+1,44+0,14+1,44+0,07+0,51 =0,07+4,94+0,07

L 1.50 p 1.86 2.37 5.08

Berat Besi Plat meja 138.40

Per 10

3,226,426.75

Kawat Bendrat

No

Uraian Pekerjaan 6 Pekj. Pas. Batu belah 1Pc : 4Ps Balok Tumpu balok Gelagar Uraian Pekerjaan Total Volume pas Batu Belah

B No

131,587,912.66 136,364,339.41 13,636,433.94 150,000,773.35 150,000,000.00

P 7.60 8 0.4 Volume Pa.s bt belah 40.43

PEKJ. BALOK TUMPU Pekerjaan 1 BALOK TUMPU Beton K. 225 2 PEKJ. PENULANGAN Ø 10 mm a Tul. balok Tumpu Ø 10 mm

P 8 Hit =0,05+1.44+0,5+4+0,5+1.44+0,05

b Beugel Blk Tumpu Ø 8 mm

Hit =0,05+0,24+0,34+0,24+0,34+0,05

Kawat Bendrat

Berat Besi balok tumpu 40.81

T 0.20 Hit 21 21 17 Berat Besi P Berat Besi P Koef kawat 0.1500

T 2.80

L 0.95 Pas. Batu bela 0.4 0.3 0.5 0.3 Vol. Balok Tumpu Dan B Vol blk Tumpu dan Gelagar 2.28

T L 0.4 0.3 P 7.98 Berat besi Tul.per 1 Berat besi Tul. per 2 P Hit 1.26 =8/0,2+1 Berat Besi begel Per 1 Berat Besi begel Per 2 Per Koef kawat 10 0.1500

2015

AN DAN PEMAKAMAN EBERSIHAN DAN PJU ABUPATEN DEMAK

MBUAT KOMITMEN

A No

PEKJ. BETON GELAGAR (3 Buah) Pekerjaan P 1 BETON GELAGAR Beton Struktur K.225 9 PEKJ. PENULANGAN Ø 22 mm 2 Hit. Tul balok Gelagar =0,07+8,94+0,07

T L 0.3 0.5 P jlh 9.08 14 Berat Besi Tul. Gelagar Per 1 Berat Besi Tul. Gelagar Per 3

3 PEKJ. PENULANGAN Beugel Ø 10 mm Hit. a Beugel balok Gelagar =0,7+0,24+0.64+0,24+0,64+0,7

N PRASETYO, ST 914 200312 1 002

Kawat Bendrat

C No

D No

Berat Besi balok gelagar 269.06

PEKJ. BEGESTING Pekerjaan 1 BEGESTING Kayu Tahun a Begesting Plat jembatan b Begesting Gelagar

=((0,22+0,50)*2)+0,8+0,8 =0,5+0,3+0,5

c bambu perancah

=4,4/0,5+1

hit.

PEKJ. LANTAI JEMBATAN BETON Pekerjaan P 1 Beton Lantai jembatan Struktur k.225 9.00 2 PEKERJAAN PENULANGAN Hit. Tulangan melintang 1. Ø12 mm =0.05+0.15+4.94+0.15+0.05 Tulangan melintang 2. Ø12 mm =0.05+3.94+0.05

Tulangan memanjang 1. Ø12 mm Tulangan memanjang 2. Ø12 mm

=0.05+0.15+8.94+0.15+0.05 =0.05+8.94+0.05

Kawat Bendrat

Berat Besi lantai jembatan 687.37 hit 9

Uraian Pekerjaan Plesteran + acian book beton

PEKJ. TIANG LEUNNING Uraian Pekerjaan P 1 TIANG LEUNNING Beton Struktur K. 17 1.00 No PEKJ. PENULANGAN Ø 8 mm hit =(0,05+0,13)x2)+0,18+0,85+0,12,56+ 2 Tul Tiang Leunning Ø 8 mm 0,90+0,31 F No

Beugel Tiang Leunning Ø 6 mm

Kawat Bendrat Plesteran + acian G

PEKJ. BALOK SANDUNG

hit =0,05+0,12+0,08+0,12+0,08+0,05

Berat Besi tiang leunning 148.16 1.00

P

Hit 3.16 =9,00/0,20+1

Berat Besi Beugel Per 1 B Berat Besi Beugel Per 3 B Per Koef kawat 10 0.1500

L

P

3.04 9 1.3 9 Begesting Gelagar + Plat la pj(Titik) 10 =3,5/0,5+1

T L 4.00 0.20 P Hit. 4.34 =9,00/0.20+1 4.04 =9,00/0.20+1 Berat besi lanta

9.34 =4,00/0,20+1 9.04 =4,00/0,20+1 Berat besi lantai t Jumlah berat besi la Per Koef kawat 10 0.1500 p 0.3

L 0.14 p 15.16

T 0.10 hit

total Berat Bes hit 0.5 =1,00/0,2 Berat Besi begel. Per 1 Berat Besi begel. Per 12 T Total berat Per Koef kawat 10 0.1500 0.6 p

No

Pekerjaan 1 BALOK SANDUNG Beton Struktur K. 175

P 4

2 PENULANGAN Ø 8 mm Tul B. Sandung Ø 8 mm

hit

Beugel B. Sandung Ø 6 mm

Kawat Bendrat

=0,05+3,94+0,05

hit =0,05+0,24+0,16+0,24+0,16+0,05

Berat Besi balok sandung 19.96

PEK. BOOK PAS. BT BELAH 1PC : 6PS Uraian Pekerjaan Pekj. Book Pas. Bt belah 1Pc : 6Ps

No

T L 0.20 0.3 Volume B. sandung p P 4.04 Berat besi Tul. Per 1 B Berat besi Tul. Per 2 B P 0.90 =4,00/0,2+1 Berat Besi begel Per 1 b Berat Besi begel Per 2 B Total berat besi b Per Koef kawat 10 0.1500

P

L 1.50

T 0.80

Uraian Pekerjaan Plesteran + acian book beton

hit =1,5 x (0,8+0,3+0,8) =0,8 x 0,3

p

Uraian Pekerjaan Pek Opritan Urugan Padas

P 8.7

L 4

2.85 0.24

PERHITUNGAN VOLUME PEKERJAAN JEMBATAN BETON : PEMBANGUNAN JEMBATAN DUKUH SOKO RW. 11 BRAMBANG KEC. KARANGAWEN Uk. 9,00 m x 4,00 m x 0,20 m I PEKERJAAN TANAH No Pekerjaan P L 1 Pekj. Galian Tanah 7.60 1.5 2 Pekj. Urugan kembali 7.60

O RW. 11 BRAMBANG KEC.

0.4

T 0.50

T 2.6

mak Tahun 2015 Harga Total ( Rp. ) 7

-

II No

PEKERJAAN JEMBATAN 9 X 4 Pekerjaan 1 Pekj. Pancang Cerucuk Bambu

No

Hit =8/1+1

J1 8.60

Hit =1+1

Pekerjaan 2 Pekj. Urugan pasir Dasar

P 7.60

L 1.50

T 0.05

No

Pekerjaan 3 Pekj. Beton nol (beton non Struktur K.125)

P 7.60

L 1.50

T 0.05

No

Pekerjaan 4 Pekj. Anstamping

P 7.60

L 1.50

T 0.30

No

Pekerjaan

P

L

T

-

5 Pekj. Beton Plat Meja K.175 Penulangan Melintang 1 Ø 8 mm Melintang 2 Ø 8 mm Memanjang Ø 8 mm

Kawat Bendrat

No

Uraian Pekerjaan 6 Pekj. Pas. Batu belah 1Pc : 4Ps Balok Tumpu balok Gelagar Uraian Pekerjaan Total Volume pas Batu Belah

B No

-

7.60 Hit =0,07+0,14+1,44+0,14+1,44+0,07 =0,07+0,14+1,44+0,14+1,44+0,07+0,51 =0,07+4,94+0,07

1.50 p 1.86 2.37 5.08

Berat Besi Plat meja 138.40

Per 10

P 7.60 8 0.4 Volume Pa.s bt belah 40.43

PEKJ. BALOK TUMPU Pekerjaan 1 BALOK TUMPU Beton K. 225 2 PEKJ. PENULANGAN Ø 10 mm a Tul. balok Tumpu Ø 10 mm

P 8 Hit =0,05+1.44+0,5+4+0,5+1.44+0,05

b Beugel Blk Tumpu Ø 8 mm

Hit =0,05+0,24+0,34+0,24+0,34+0,05

Kawat Bendrat

Berat Besi balok tumpu 40.81

0.20 Hit 21 21 17 Berat Besi P Berat Besi P Koef kawat 0.1500

T 2.80

L 0.95 Pas. Batu bela 0.4 0.3 0.5 0.3 Vol. Balok Tumpu Dan B Vol blk Tumpu dan Gelagar 2.28

T L 0.4 0.3 P 7.98 Berat besi Tul.per 1 Berat besi Tul. per 2 P Hit 1.26 =8/0,2+1 Berat Besi begel Per 1 Berat Besi begel Per 2 Per Koef kawat 10 0.1500

2015 A No

…………………………..

PEKJ. BETON GELAGAR (3 Buah) Pekerjaan P 1 BETON GELAGAR Beton Struktur K.225 9 PEKJ. PENULANGAN Ø 22 mm 2 Hit. Tul balok Gelagar =0,07+8,94+0,07

………………….. 3 PEKJ. PENULANGAN Beugel Ø 10 mm Hit. a Beugel balok Gelagar =0,7+0,24+0.64+0,24+0,64+0,7

Kawat Bendrat

C No

PEKJ. BEGESTING Pekerjaan

Berat Besi balok gelagar 269.06

hit.

T L 0.3 0.5 P jlh 9.08 14 Berat Besi Tul. Gelagar Per 1 Berat Besi Tul. Gelagar Per 3 P

Hit 3.16 =9,00/0,20+1

Berat Besi Beugel Per 1 B Berat Besi Beugel Per 3 B Per Koef kawat 10 0.1500

L

P

D No

1 BEGESTING Kayu Tahun a Begesting Plat jembatan b Begesting Gelagar

=((0,22+0,50)*2)+0,8+0,8 =0,5+0,3+0,5

c bambu perancah

=4,4/0,5+1

3.04 9 1.3 9 Begesting Gelagar + Plat la pj(Titik) 10 =3,5/0,5+1

PEKJ. LANTAI JEMBATAN BETON Pekerjaan P 1 Beton Lantai jembatan Struktur k.225 9.00 2 PEKERJAAN PENULANGAN Hit. Tulangan melintang 1. Ø12 mm =0.05+0.15+4.94+0.15+0.05 Tulangan melintang 2. Ø12 mm =0.05+3.94+0.05

Tulangan memanjang 1. Ø12 mm Tulangan memanjang 2. Ø12 mm

=0.05+0.15+8.94+0.15+0.05 =0.05+8.94+0.05

Kawat Bendrat

Berat Besi lantai jembatan 687.37 hit 9

Uraian Pekerjaan Plesteran + acian book beton

T L 4.00 0.20 P Hit. 4.34 =9,00/0.20+1 4.04 =9,00/0.20+1 Berat besi lanta

9.34 =4,00/0,20+1 9.04 =4,00/0,20+1 Berat besi lantai t Jumlah berat besi la Per Koef kawat 10 0.1500 p 0.3

PEKJ. TIANG LEUNNING Uraian Pekerjaan P 1 TIANG LEUNNING Beton Struktur K. 17 1.00 No PEKJ. PENULANGAN Ø 8 mm hit =(0,05+0,13)x2)+0,18+0,85+0,12,56+ 2 Tul Tiang Leunning Ø 8 mm 0,90+0,31 F No

Beugel Tiang Leunning Ø 6 mm

Kawat Bendrat Plesteran + acian G No

hit =0,05+0,12+0,08+0,12+0,08+0,05

2 PENULANGAN Ø 8 mm Tul B. Sandung Ø 8 mm

Beugel B. Sandung Ø 6 mm

Kawat Bendrat

P 4

Uraian Pekerjaan Plesteran + acian book beton

=0,05+3,94+0,05

hit =0,05+0,24+0,16+0,24+0,16+0,05

Berat Besi balok sandung 19.96

P

hit =1,5 x (0,8+0,3+0,8) =0,8 x 0,3

total Berat Bes hit 0.5 =1,00/0,2 Berat Besi begel. Per 1 Berat Besi begel. Per 12 T Total berat Per Koef kawat 10 0.1500 0.6

T L 0.20 0.3 Volume B. sandung p P 4.04 Berat besi Tul. Per 1 B Berat besi Tul. Per 2 B P 0.90 =4,00/0,2+1 Berat Besi begel Per 1 b Berat Besi begel Per 2 B Total berat besi b Per Koef kawat 10 0.1500

hit

PEK. BOOK PAS. BT BELAH 1PC : 6PS Uraian Pekerjaan Pekj. Book Pas. Bt belah 1Pc : 6Ps

T 0.10 hit

p

Berat Besi tiang leunning 148.16 1.00

PEKJ. BALOK SANDUNG Pekerjaan 1 BALOK SANDUNG Beton Struktur K. 175

L 0.14 p 15.16

L 1.50

T 0.80

p 2.85 0.24

0.4

No

Uraian Pekerjaan Pek Opritan Urugan Padas

P 8.7

L 4

T 0.50

q 2 3

n

Volume Sat. Ket. 59.28 m3 V= p*l*t*q 9.88 m3 V= p*n*/q

3.9

J2 2

q

q 2

n

Volume Sat. Ket. 1.14 m3 V= p*l*t*q

q 2

n

Volume Sat. 1.14 m3

q 2

n

Volume Sat. Ket. 6.84 m3 V= p*l*t*q

2

Volume Sat. Ket. V= j1*j2*q 34.40 m'

q n Volume Sat. 2 4.56 m3 Koef Volume Sat. 0.395 15.43 Kg 0.395 19.66 Kg 0.395 34.11 Kg Berat Besi Per 1 Plat Meja 69.20 Kg Berat Besi Per 2 Plat Meja 138.40 Kg Volume Sat. 2.08 Kg

Ket.

Ket. Ket.

Ket.

q

Volume Sat. Ket. 20.22 m3 V= p*t*l Pas. Batu belah 2 Abutment 40.43 m3 2 1.92 m3 6 0.36 m3 ok Tumpu Dan Balok Gelagar 2.28 m3 u dan Gelagar 38.15 m3

q n Volume Sat. Ket. 2 1.92 m3 V= p*l*t*q Ket. jlh Koef Volume Sat. V= p*j*K 8 0.617 39.39 Kg at besi Tul.per 1 Balok Tumpu 39.39 Kg at besi Tul. per 2 Balok Tumpu 78.78 kg Ket. jlh Koef Volume Sat. V= p*j*K 41.00 0.395 20.41 Kg Besi begel Per 1 Balok Tumpu 20.41 kg Besi begel Per 2 Balok Tumpu 40.81 kg Volume Sat. Ket. 0.61 Kg

q 3

n

Volume Sat. Ket. V= p*l*t*q 4.05 Ket. q Koef Volume Sat. V= p*j*K 2.984 379.33 kg . Gelagar Per 1 balok Gelagar 379.33 kg . Gelagar Per 3 balok Gelagar 1137.98 kg

5.44

5.04 3.11 6.26 6.08 6.40 6.46 3.28 6.12 8.58 -0.5 -0.5 #REF! #REF! #REF! -0.5 #REF!

0.64 1.91 5.01 3.9 3.34 3.54 2.94 2.14 1.34 4.94

1.5 1.5 5

j Koef Volume Sat. Ket. V= p*j*K 46.00 0.617 89.69 kg

si Beugel Per 1 Balok Gelagar si Beugel Per 3 Balok Gelagar

q

n

89.69 kg 269.06 kg Volume Sat. 4.04 Kg

Volume

Sat.

27.36 m2 3 35.1 m2 Gelagar + Plat lantai Jembatan 62.46 m2 L (Titik) Volume 8 80 btg

q

Ket.

Ket. V=l*p V=l*p*q

V= p*l

n

Volume Sat. Ket. 7.20 m3 V= p*l*t jlh Koef Volume Sat. Ket. V= p*j*k 46.00 0.891 177.88 kg V=p*j*k 46.00 0.891 165.58 kg Berat besi lantai tul melintang 343.46

21 0.891 21 0.891 erat besi lantai tul memanjang mlah berat besi lantai jembatan

q 2

q 12 jlh

n

Koef 2 0.395 total Berat Besi Tul Leunning jlh Koef 5 0.222 esi begel. Per 1 Tiang leuning si begel. Per 12 Tiang Leuning Total berat besi leunning

12

V=p*j*k 174.76 kg V=p*j*k 169.15 kg 343.91 kg 687.37 kg Volume Sat. Ket. 10.31 Kg Volume Sat. Ket. 0.60 m2 v=p*q

Volume Sat. 0.17 m3 Volume Sat. 11.98 kg 143.72 kg Volume Sat. 0.56 kg 0.56 kg 4.44 kg 148.16 kg Volume Sat. 2.22 Kg 7.20 m2

Ket. V= p*l*t*q Ket. V=p*j*k Ket. V=p*j*k

Ket. v=p*l*j

4 5.5 6

q

n

me B. sandung per 2 Abutment jlh Koef 4 0.395 besi Tul. Per 1 Balok Sandung besi Tul. Per 2 Balok Sandung jlh Koef 18.00 0.222 esi begel Per 1 balok sandung esi begel Per 2 Balok sandung Total berat besi balok sandung

q

Volume Sat. Ket. v=p*l*t*q 1.92 m3

4 q

Volume Sat. Ket. 11.4 m2 v=p*q 1.92 m2 v=p*q 13.32 m2 v=p*q

4 8

q

q 2 3

Volume Sat. Ket. 0.24 m3 V=p*t*l 0.48 m3 Ket. Volume Sat. V=p*j*k 6.38 kg 6.38 kg 12.77 kg Ket. Volume Sat. V=p*j*k 3.60 kg 3.60 kg 7.19 kg 19.96 kg Volume Sat. Ket. 0.30 Kg

Volume Sat. Ket. 17.40 m3 V=p* l*t/2

n

Volume Sat. Ket. 59.28 m3 V= p*l*t*q 9.88 m3 V= p*n*/q

3.9

J2 2

q

q 2

n

Volume Sat. Ket. 1.14 m3 V= p*l*t*q

q 2

n

Volume Sat. 1.14 m3

q 2

n

Volume Sat. Ket. 6.84 m3 V= p*l*t*q

q

n

Volume

2

Volume Sat. Ket. V= j1*j2*q 34.40 m'

Sat.

Ket.

Ket.

2 4.56 m3 Koef Volume Sat. 0.395 15.43 Kg 0.395 19.66 Kg 0.395 34.11 Kg Berat Besi Per 1 Plat Meja 69.20 Kg Berat Besi Per 2 Plat Meja 138.40 Kg Volume Sat. 2.08 Kg

Ket.

Ket.

q

Volume Sat. Ket. 20.22 m3 V= p*t*l Pas. Batu belah 2 Abutment 40.43 m3 2 1.92 m3 6 0.36 m3 ok Tumpu Dan Balok Gelagar 2.28 m3 u dan Gelagar 38.15 m3

q n Volume Sat. Ket. 2 1.92 m3 V= p*l*t*q Ket. jlh Koef Volume Sat. V= p*j*K 8 0.617 39.39 Kg at besi Tul.per 1 Balok Tumpu 39.39 Kg at besi Tul. per 2 Balok Tumpu 78.78 kg Ket. jlh Koef Volume Sat. V= p*j*K 41.00 0.395 20.41 Kg Besi begel Per 1 Balok Tumpu 20.41 kg Besi begel Per 2 Balok Tumpu 40.81 kg Volume Sat. Ket. 0.61 Kg

q 3

5.44

5.04 3.11 6.26 6.08 6.40 6.46 3.28 6.12 8.58 -0.5 -0.5 #REF! #REF! #REF! -0.5 #REF!

n

Volume Sat. Ket. V= p*l*t*q 4.05 Ket. q Koef Volume Sat. V= p*j*K 2.984 379.33 kg . Gelagar Per 1 balok Gelagar 379.33 kg . Gelagar Per 3 balok Gelagar 1137.98 kg j Koef Volume Sat. Ket. V= p*j*K 46.00 0.617 89.69 kg

si Beugel Per 1 Balok Gelagar si Beugel Per 3 Balok Gelagar

q

n

89.69 kg 269.06 kg Volume Sat. 4.04 Kg

Volume

Sat.

Ket.

Ket.

4 5.5 6

0.64 1.91 5.01 3.9 3.34 3.54 2.94 2.14 1.34 4.94

1.5 1.5 5

27.36 m2 3 35.1 m2 Gelagar + Plat lantai Jembatan 62.46 m2 L (Titik) Volume 8 80 btg

q

V=l*p V=l*p*q

V= p*l

n

Volume Sat. Ket. 7.20 m3 V= p*l*t jlh Koef Volume Sat. Ket. V= p*j*k 46.00 0.891 177.88 kg V=p*j*k 46.00 0.891 165.58 kg Berat besi lantai tul melintang 343.46

21 0.891 21 0.891 erat besi lantai tul memanjang mlah berat besi lantai jembatan

q 2

q 12 jlh

n

Koef 2 0.395 total Berat Besi Tul Leunning jlh Koef 5 0.222 esi begel. Per 1 Tiang leuning si begel. Per 12 Tiang Leuning Total berat besi leunning

12

q

n

me B. sandung per 2 Abutment jlh Koef 4 0.395 besi Tul. Per 1 Balok Sandung besi Tul. Per 2 Balok Sandung jlh Koef 18.00 0.222 esi begel Per 1 balok sandung esi begel Per 2 Balok sandung Total berat besi balok sandung

q 4 q 4 8

V=p*j*k 174.76 kg V=p*j*k 169.15 kg 343.91 kg 687.37 kg Volume Sat. Ket. 10.31 Kg Volume Sat. Ket. 0.60 m2 v=p*q

Volume Sat. 0.17 m3 Volume Sat. 11.98 kg 143.72 kg Volume Sat. 0.56 kg 0.56 kg 4.44 kg 148.16 kg Volume Sat. 2.22 Kg 7.20 m2

Ket. V= p*l*t*q Ket. V=p*j*k Ket. V=p*j*k

Ket. v=p*l*j

Volume Sat. Ket. 0.24 m3 V=p*t*l 0.48 m3 Ket. Volume Sat. V=p*j*k 6.38 kg 6.38 kg 12.77 kg Ket. Volume Sat. V=p*j*k 3.60 kg 3.60 kg 7.19 kg 19.96 kg Volume Sat. Ket. 0.30 Kg

Volume Sat. Ket. 1.92 m3 v=p*l*t*q Volume Sat. Ket. 11.4 m2 v=p*q 1.92 m2 v=p*q 13.32 m2 v=p*q

q

Volume Sat. Ket. 17.40 m3 V=p* l*t/2

P.01e

Bongkar Pasangan 1 m3 Batu No

A

Uraian

Kode

Satuan

Tenaga Pekerja Mandor

OH OH

B

Bahan

C

Peralatan Palu Pahat/ Betel

Koefisien

Harga Satuan

1.8500 Rp 57,400.00 Rp 0.1850 Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

Jumlah harga 106,190.00 15,873.00

Jumlah Harga Bahan 0.050 Rp 30,000.00 Rp 0.150 Rp 15,000.00 Rp Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

P.01f

1 m3 persiapan pemanfaatan kembali material batu dari bekas Bongkaran Pas No

A

Uraian

13 X D

Kode

Satuan

Tenaga Pekerja Mandor

OH OH

B

Bahan

C

Peralatan Palu Pahat/ Betel

1,500.00 2,250.00

Koefisien

Harga Satuan

0.2000 Rp 57,400.00 Rp 0.0200 Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

Jumlah harga 11,480.00 1,716.00

Jumlah Harga Bahan 0.010 Rp 30,000.00 Rp 0.030 Rp 15,000.00 Rp Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

T.06a No A

300.00 450.00

13 X D

1 m3 galian tanah biasa sedalam s.d 1 m Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan OH OH

Koefisien

Harga Satuan

0.6750 Rp 0.0675 Rp

57,400.00 Rp 85,800.00 Rp

Jumlah harga 38,745.00 5,791.50

Jumlah Harga Tenaga Kerja B

Bahan Jumlah Harga Bahan

C

Peralatn

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Jumlah Harga Peralatan

T.14a No A

13 X D

1 m3 urugan tanah kembali (1 m3) Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan OH OH

Koefisien

Harga Satuan

0.3300 Rp 0.0330 Rp

57,400.00 Rp 85,800.00 Rp

Jumlah Harga Tenaga Kerja

Jumlah harga 18,942.00 2,831.40

B

Bahan

C

Peralatan

Jumlah Harga Bahan Jumlah Harga Peralatan D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

P.07b

1 m panjang cerucuk bambu diameter 8 cm - 10 cm No

A

B

Uraian Tenaga Pekerja Mandor Operator Tripod *)

13 X D

Kode

Bahan bambu dia. 8 cm -10 cm

Satuan

Koefisien

Harga Satuan

Jumlah harga

OH OH OH

0.036 Rp 57,400.00 Rp 0.004 Rp 85,800.00 Rp 0.006 Rp - Rp Jumlah Harga Tenaga Kerja

2,066.40 343.20 -

m'

1.05 Rp 3,250.00 Rp Jumlah Harga Bahan

3,412.50

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

T.14c

1 m3 Timbunan pasir sebagai bahan pengisi (1 m3)

Jumlah Harga Peralatan

No

B

Uraian

13 X D

Kode

Tenaga Pekerja Mandor

L.01 L.04

Bahan pasir Urug

M.14.b

Satuan OH OH

Koefisien

Harga Satuan

Jumlah harga

0.4000 Rp 57,400.00 Rp 0.0400 Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

22,960.00 3,432.00

1.2 Rp 117,000.00 Rp Jumlah Harga Bahan

140,400.00

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.03 b) molen No A

1 m3 beton mutu, f'c = 9,8 Mpac(K125), slump (12 ± 2) cm, w/c = 0,78

Jumlah Harga Peralatan

Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 1.323 0.189 0.019 0.132

Harga Satuan Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

Jumlah harga 75,940.20 13,230.00 1,425.00 11,325.60

B

C

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

Peralatan Molen

E.28.b

sewa hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

A.3.2.1.9

1 m3 batu kosong (anstamping)

No A

B

Uraian Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

276 828 1012 215

Rp 1,438.00 Rp 251.79 Rp 152.83 Rp 50.00 Jumlah Harga Bahan

Rp Rp Rp Rp

396,888.00 208,478.57 154,667.33 10,750.00

0.250 Rp 73,966.51 Rp Jumlah Harga Peralatan

18,491.63

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Batu Belah Pasir urug

m3 m3

Koefisien 0.7800 0.3900 0.0390 0.0390

Harga Satuan

Jumlah harga

Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

1.200 Rp 0.432 Rp

251,300.00 Rp 117,000.00 Rp

44,772.00 27,300.00 2,925.00 3,346.20

301,560.00 50,544.00

Jumlah Harga Bahan C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.051 b) molen No A

1 m3 beton mutu, f'c = 14,5 Mpac(K175), slump (12 ± 2) cm, w/c = 0,66

Jumlah Harga Peralatan

B

C

Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

Peralatan Molen

E.28.b

sewa hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

P.01c

1 m3 Pasangan Batu Campuran 1 PC : 4 PP

Koefisien 1.323 0.189 0.019 0.132

326 760 1029 215

Harga Satuan

Jumlah harga

Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja Rp 1,438.00 Rp 251.79 Rp 152.83 Rp 50.00 Jumlah Harga Bahan

75,940.20 13,230.00 1,425.00 11,325.60

Rp Rp Rp Rp

468,788.00 191,357.14 157,265.50 10,750.00

0.250 Rp 73,966.51 Rp Jumlah Harga Peralatan

18,491.63

13 X D

No A

B

C

Uraian

Kode

Satuan

Tenaga Pekerja Tukang Kepala Tukang Mandor

OH OH OH OH

Bahan Batu Belah 15/20 Pasir Beton Semen

m3 m3 kg

Peralatan Molen (sewa-hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.17

Pembesian 100 kg dengan besi polos atau ulir No

A

B

Uraian Tenaga Pekerja Tukang besi Kepala Tukang Mandor Bahan Besi beton/ulir Kawat ikat

Koefisien

Harga Satuan

2.7000 0.9000 0.0900 0.2700

Jumlah harga

Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

154,980.00 63,000.00 6,750.00 23,166.00

1.200 Rp 251,300.00 Rp 0.520 Rp 352,500.00 Rp 163 Rp 1,438.00 Rp Jumlah Harga Bahan

301,560.00 183,300.00 234,394.00

0.167 Rp 73,966.51 Rp Jumlah Harga Peralatan

12,352.41

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

M.55.d M.60

kg kg

Koefisien

Harga Satuan

0.700 0.700 0.070 0.070

Jumlah harga

Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

40,180.00 49,000.00 5,250.00 6,006.00

105 Rp 10,700.00 Rp 1.5 Rp 17,800.00 Rp Jumlah Harga Bahan

1,123,500.00 26,700.00

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-100 kg (D+E)

B.07 b) molen No A

1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58

Jumlah Harga Peralatan

Uraian Tenaga Pekerja

13 X D

Kode

Satuan

L.01

OH

Koefisien 1.323 Rp

Harga Satuan 57,400.00 Rp

Jumlah harga 75,940.20

B

C

Tukang batu Kepala Tukang Mandor

L.02 L.03 L.04

OH OH OH

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

Peralatan Molen

E.28.b

sewa hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.21

0.189 Rp 70,000.00 Rp 0.019 Rp 75,000.00 Rp 0.132 Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja 371 698 1047 215

Rp 1,438.00 Rp 251.79 Rp 152.83 Rp 50.00 Jumlah Harga Bahan

Rp Rp Rp Rp

533,498.00 175,746.43 160,016.50 10,750.00

0.250 Rp 73,966.51 Rp Jumlah Harga Peralatan

18,491.63

13 X D

D

1 m2 bekisting u/ permukaan beton biasa dgn multiflex 12 mm atau 18 mm (tanpa perancah) Uraian Kode Satuan Koefisien Harga Satuan Tenaga Pekerja L.01 OH 0.200 Rp 57,400.00 Rp Tukang kayu L.02 OH 0.600 Rp 70,000.00 Rp Kepala Tukang L.03 OH 0.060 Rp 75,000.00 Rp Mandor L.04 OH 0.020 Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja Bahan Multiflex 18 mm M.38.d lbr 0.35 Rp 160,000.00 Rp Kaso 5/7 kelas III M.33.d m3 0.02 Rp 2,000,000.00 Rp Paku 5 & 7 cm M.65.b kg 0.25 Rp 15,500.00 Rp myk bekisting M.129 L 0.20 Rp 10,300.00 Rp Jumlah Harga Bahan Peralatan Jumlah Harga Peralatan Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m 2 (D+E)

1.6,23

1,0000 m1 memasang 1 m pipa galvanis Ø 2 1/2"

No A

B

C

No A

Uraian

Jumlah harga 11,480.00 42,000.00 4,500.00 1,716.00

56,000.00 40,000.00 3,875.00 2,060.00

13 X D

Kode

Tenaga Pekerja Tukang Kepala Tukang Mandor

B

13,230.00 1,425.00 11,325.60

Satuan OH OH OH OH

Bahan pipa galvanis perlengkapan 35 % harga pipa

m'

Koefisien 0.1080 0.1800 0.0180 0.0054

Harga Hatuan Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

1.2000 Rp 0.3500 Rp

130,833.33 Rp 45,791.67 Rp

Jumlah harga 6,199.20 12,600.00 1,350.00 463.32

157,000.00 16,027.08

Jumlah Harga Bahan C

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C A.3.2.1.4 No A

B

1 m3 Pasangan Batu Campuran 1 PC : 6 PS Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor Bahan

Kode

Satuan OH OH OH OH

Koefisien 1.5000 0.7500 0.0750 0.0750

Harga Satuan Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

Jumlah harga 86,100.00 52,500.00 5,625.00 6,435.00

Batu Belah 15/20 Pasir Beton Semen C

m3 m3 kg

Peralatan Molen (sewa-hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

C

Satuan

Koefisien

Harga Satuan

Bahan cuka bibit

M.118

L

1.200 Rp 3,075.00 Rp Jumlah Harga Bahan

3,690.00

Peralatan Palu/godam gergaji besi pahat beton (baja keras)

E.30 E.29

bh Ls bh

0.1 Rp 62,500.00 Rp 0.2 Rp - Rp 0.5 Rp - Rp Jumlah Harga Peralatan

6,250.00 -

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m 2 (D+E)

P.01d

1 m3 Pasangan Batu Campuran 1 PC : 5 PS Uraian

13 X D

Kode

Satuan

Tenaga Pekerja Tukang Kepala Tukang Mandor

OH OH OH OH

Bahan Batu Belah 15/20 Pasir Beton Semen

m3 m3 kg

Peralatan Molen (sewa-hari

Koefisien 2.7000 0.9000 0.0900 0.2700

Harga Satuan

154,980.00 63,000.00 6,750.00 23,166.00

1.200 Rp 192,500.00 Rp 0.544 Rp 352,500.00 Rp 135 Rp 1,438.00 Rp Jumlah Harga Bahan

231,000.00 191,760.00 194,130.00

0.167 Rp 73,966.51 Rp Jumlah Harga Peralatan

12,352.41

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

1.6,14

1,0000 m2 pengecat tembok baru ( 1 lap. Plamir, 1 lap cat dasar 2 lap. Cat penutup No

Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Jumlah harga

Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

D

A

Jumlah harga 152,110.00 22,737.00

E

C

12,352.41

2.650 Rp 57,400.00 Rp 0.265 Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

Jumlah A+B+C

B

0.167 Rp 73,966.51 Rp Jumlah Harga Peralatan

OH OH

D

No

301,560.00 197,752.50 168,246.00

13 X D

B.39 bongkar 1 m3 beton secara konvensional No Uraian Kode A Tenaga Pekerja L.01 Mandor L.04 B

1.200 Rp 251,300.00 Rp 0.561 Rp 352,500.00 Rp 117 Rp 1,438.00 Rp Jumlah Harga Bahan

13 X D

Kode

Satuan OH OH OH OH

Koefisien 0.0200 0.0630 0.0063 0.0025

Harga Hatuan Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

Jumlah harga 1,148.00 4,410.00 472.50 214.50

B

Bahan Plamir cat dasar cat penutup 2 kali

C

Peralatan

D

Jumlah A+B+C

kg kg kg

0.1000 Rp 13,300.00 Rp 0.1000 Rp 25,400.00 Rp 0.2600 Rp 25,400.00 Rp Jumlah Harga Bahan

1,330.00 2,540.00 6,604.00

Jumlah Harga Peralatan

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm No Uraian Kode Satuan Koefisien A

B

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

L.01 L.03 L.03 L.04

Bahan PC PP

OH OH OH OH

Kg m3

C

Peralatan

D E F

Jumlah (A+B+C) Overhead & Profit ( 13 %) Harga Satuan Pekerjaan (D+E)

Harga Satuan

Jumlah Harga

0.3 0.15 0.015 0.015

57,400.00 70,000.00 75,000.00 85,800.00 Jumlah Harga Tenaga Kerja

5.184 0.026

1,438.00 352,500.00 Jumlah Harga Bahan

17,220.00 10,500.00 1,125.00 1,287.00

7,454.59 9,165.00

Jumlah Harga Peralatan 13% x D

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU No A. 1 2

Uraian TENAGA Pekerja Mandor

B. 1

BAHAN Bahan timbunan ( SIRTU )

C.

PERALATAN

Kode

Satuan

Koefisien

Harga Satuan (Rp)

OH OH

0.3000 0.0100

57,400.00 85,800.00 Jumlah Harga Tenaga Kerja

m3

1.2000

166,600.00 Jumlah Harga Bahan Jumlah Harga Peralatan

D. E. F.

Jumlah Harga (Rp)

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E )

17,220.00 858.00

199,920.00

P.01e

Bongkar Pasangan 1 m3 Batu No

A

Uraian Tenaga Pekerja Mandor

B

Bahan

C

Peralatan Palu

Kode

Satuan OH OH

Koefisien 1.8500 0.1850

Harga Satuan

Jumlah harga

Jumlah Harga Tenaga Kerja

-

Jumlah Harga Bahan 0.050

-

-

Pahat/ Betel

0.150

Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

P.01f

1 m3 persiapan pemanfaatan kembali material batu dari bekas Bongkaran Pas No

A

Uraian

13 X D

Kode

Satuan

Tenaga Pekerja Mandor

B

-

OH OH

Koefisien 0.2000 0.0200

Harga Satuan

Jumlah harga

Jumlah Harga Tenaga Kerja

-

Bahan Jumlah Harga Bahan

C

Peralatan Palu Pahat/ Betel

0.010 0.030

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

T.06b No A

Jumlah Harga Peralatan

-

13 X D

1 m3 galian tanah biasa sedalam s.d 1 m Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan OH OH

Koefisien

Harga Satuan

0.6750 0.0675

Jumlah harga -

-

Jumlah Harga Tenaga Kerja B

Bahan

C

Peralatn

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Jumlah Harga Bahan Jumlah Harga Peralatan

T.14a No A

13 X D

1 m3 urugan tanah kembali (1 m3) Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan OH OH

Koefisien

Harga Satuan

0.3300 0.0330

Jumlah harga -

Jumlah Harga Tenaga Kerja B

Bahan

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Jumlah Harga Bahan Jumlah Harga Peralatan

13 X D

-

P.07b

1 m panjang cerucuk bambu diameter 8 cm - 10 cm No

A

B

Uraian Tenaga Pekerja Mandor Operator Tripod *)

Kode

Satuan

Bahan bambu dia. 8 cm -10 cm

Koefisien

Harga Satuan

OH OH OH

0.036 0.004 0.006

m'

1.05

Jumlah harga

Jumlah Harga Tenaga Kerja

-

-

-

Jumlah Harga Bahan C

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

T.14c

1 m3 Timbunan pasir sebagai bahan pengisi (1 m3) No

B

13 X D

Uraian

Kode

Tenaga Pekerja Mandor

L.01 L.04

Bahan pasir Urug

M.14.b

Satuan OH OH

Koefisien

Harga Satuan

0.4000 0.0400

Jumlah harga

Jumlah Harga Tenaga Kerja

1.2

-

-

-

Jumlah Harga Bahan C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.03 b) molen No A

1 m3 beton mutu, f'c = 9,8 Mpac(K125), slump (12 ± 2) cm, w/c = 0,78

Jumlah Harga Peralatan

B

Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Semen Pasir beton/PB Krikil/Kr Air

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

M.15 M.14.a M.12 M.02

kg kg kg L

Koefisien 1.323 0.189 0.019 0.132

Harga Satuan

Jumlah harga

Jumlah Harga Tenaga Kerja

276 828 1012 215

-

-

-

Jumlah Harga Peralatan

-

Jumlah Harga Bahan C

Peralatan Molen

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

E.28.b

sewa hari

0.250

13 X D

F

Harga Satuan Pekerjaan per-m3 (D+E)

A.3.2.1.9

1 m3 batu kosong (anstamping)

No A

B

Uraian Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Batu Belah Pasir urug

m3 m3

Koefisien 0.7800 0.3900 0.0390 0.0390

Harga Satuan

Jumlah harga

Jumlah Harga Tenaga Kerja

1.200 0.432

-

-

-

Jumlah Harga Bahan C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.051 b) molen No A

1 m3 beton mutu, f'c = 14,5 Mpac(K175), slump (12 ± 2) cm, w/c = 0,66

Jumlah Harga Peralatan

B

Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Semen Pasir beton/PB Krikil/Kr Air

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

M.15 M.14.a M.12 M.02

kg kg kg L

Koefisien 1.323 0.189 0.019 0.132

Harga Satuan

Jumlah harga

Jumlah Harga Tenaga Kerja

326 760 1029 215

-

-

-

Jumlah Harga Peralatan

-

Jumlah Harga Bahan C

Peralatan Molen

E.28.b

sewa hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

P.01c

1 m3 Pasangan Batu Campuran 1 PC : 4 PP No

A

B

Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor Bahan Batu Belah 15/20 Pasir Beton Semen

0.250

13 X D

Kode

Satuan OH OH OH OH

m3 m3 kg

Koefisien 2.7000 0.9000 0.0900 0.2700

Harga Satuan

Jumlah harga

Jumlah Harga Tenaga Kerja

1.200 0.520 163

Jumlah Harga Bahan

-

-

C

Peralatan Molen (sewa-hari

0.167

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.17

Pembesian 100 kg dengan besi polos atau ulir No

A

B

Uraian Tenaga Pekerja Tukang besi Kepala Tukang Mandor Bahan Besi beton/ulir Kawat ikat

Jumlah Harga Peralatan

-

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

M.55.d M.60

kg kg

Koefisien

Harga Satuan

0.700 0.700 0.070 0.070

Jumlah harga

Jumlah Harga Tenaga Kerja

105 1.5

-

-

-

Jumlah Harga Bahan C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-100 kg (D+E)

B.07 b) molen No A

1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58

Jumlah Harga Peralatan

B

Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor Bahan Semen Pasir beton/PB Krikil/Kr Air

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

M.15 M.14.a M.12 M.02

kg kg kg L

Koefisien 1.323 0.189 0.019 0.132

Harga Satuan

Jumlah harga

Jumlah Harga Tenaga Kerja

371 698 1047 215

-

-

-

-

-

Jumlah Harga Bahan C

Peralatan Molen

E.28.b

sewa hari

0.250

Jumlah Harga Peralatan D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.21

13 X D

D

1 m2 bekisting u/ permukaan beton biasa dgn multiflex 12 mm atau 18 mm (tanpa perancah) Uraian Kode Satuan Koefisien Harga Satuan Tenaga Pekerja L.01 OH 0.200 Tukang kayu L.02 OH 0.600 Kepala Tukang L.03 OH 0.060 Mandor L.04 OH 0.020 Jumlah Harga Tenaga Kerja Bahan Multiflex 18 mm M.38.d lbr 0.35 Kaso 5/7 kelas III M.33.d m3 0.02 Paku 5 & 7 cm M.65.b kg 0.25 myk bekisting M.129 L 0.20 Jumlah Harga Bahan Peralatan Jumlah Harga Peralatan Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m 2 (D+E)

1.6,23

1,0000 m1 memasang 1 m pipa galvanis Ø 2 1/2"

No A

B

C

No A

B

Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Jumlah harga -

-

13 X D

Kode

Satuan OH OH OH OH

Bahan pipa galvanis perlengkapan 35 % harga pipa

m'

Koefisien 0.1080 0.1800 0.0180 0.0054

Harga Hatuan

Jumlah harga

Jumlah Harga Tenaga Kerja

1.2000 0.3500

-

-

-

Jumlah Harga Bahan C

Peralatan

D

Jumlah A+B+C

Jumlah Harga Peralatan

A.3.2.1.4 No A

B

1 m3 Pasangan Batu Campuran 1 PC : 6 PS Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Kode

Bahan Batu Belah 15/20 Pasir Beton Semen

Satuan OH OH OH OH

m3 m3 kg

Koefisien 1.5000 0.7500 0.0750 0.0750

Harga Satuan

Jumlah harga

Jumlah Harga Tenaga Kerja

1.200 0.561 117

-

-

-

Jumlah Harga Peralatan

-

Jumlah Harga Bahan C

Peralatan Molen (sewa-hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

0.167

13 X D

B.39 bongkar 1 m3 beton secara konvensional No Uraian Kode A Tenaga Pekerja L.01 Mandor L.04 B

Bahan cuka bibit

M.118

Satuan OH OH

L

Koefisien

Harga Satuan

2.650 0.265

Jumlah harga

Jumlah Harga Tenaga Kerja

1.200

-

-

-

Jumlah Harga Peralatan

-

Jumlah Harga Bahan C

Peralatan Palu/godam gergaji besi pahat beton (baja keras)

E.30 E.29

bh Ls bh

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m 2 (D+E)

P.01d

1 m3 Pasangan Batu Campuran 1 PC : 5 PS No

B

Uraian

0.1 0.2 0.5

13 X D

Kode

Satuan

Tenaga Pekerja Tukang Kepala Tukang Mandor

OH OH OH OH

Bahan Batu Belah 15/20 Pasir Beton Semen

m3 m3 kg

Koefisien 2.7000 0.9000 0.0900 0.2700

Harga Satuan

Jumlah harga

Jumlah Harga Tenaga Kerja

1.200 0.544 135

-

-

-

Jumlah Harga Peralatan

-

Jumlah Harga Bahan C

Peralatan Molen (sewa-hari

0.167

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

1.6,14

1,0000 m2 pengecat tembok baru ( 1 lap. Plamir, 1 lap cat dasar 2 lap. Cat penutup No

A

B

Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor Bahan Plamir cat dasar cat penutup 2 kali

13 X D

Kode

Satuan OH OH OH OH

kg kg kg

Koefisien 0.0200 0.0630 0.0063 0.0025

Harga Hatuan

Jumlah harga

Jumlah Harga Tenaga Kerja

0.1000 0.1000 0.2600

-

-

-

Jumlah Harga Bahan C

Peralatan

D

Jumlah A+B+C

Jumlah Harga Peralatan

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm No Uraian Kode Satuan Koefisien A

Tenaga

Harga Satuan

Jumlah Harga

Pekerja Tukang Batu Kepala Tukang Mandor B

L.01 L.03 L.03 L.04

Bahan PC PP

C

Peralatan

D E F

Jumlah (A+B+C) Overhead & Profit ( 13 %) Harga Satuan Pekerjaan (D+E)

OH OH OH OH

Kg m3

0.3 0.15 0.015 0.015

Jumlah Harga Tenaga Kerja

-

5.184 0.026

Jumlah Harga Bahan

-

Jumlah Harga Peralatan 13% x D

Jumlah Total

Rp

122,063.00 -

Rp Rp

3,750.00 125,813.00

Rp

16,355.69

Rp

142,168.69

Jumlah Total

Rp

13,196.00 -

Rp Rp

750.00 13,946.00

Rp

1,812.98

Rp

15,758.98

Jumlah Total

Rp

44,536.50

Rp

44,536.50

Rp

5,789.75

Rp

50,326.25

Jumlah Total

Rp

21,773.40

Rp

21,773.40

Rp

2,830.54

Rp

24,603.94

Jumlah Total

Rp

2,409.60

Rp

3,412.50

Rp Rp

5,822.10

Rp

756.87

Rp

6,578.97

Jumlah Total

Rp

26,392.00

Rp

140,400.00

Rp Rp

166,792.00

Rp

21,682.96

Rp

188,474.96

Jumlah Total

Rp

101,920.80

Rp

770,783.90

Rp Rp

18,491.63 891,196.33

Rp

115,855.52

Rp

1,007,051.85

Jumlah Total

Rp

78,343.20

Rp

352,104.00

Rp Rp

430,447.20

Rp

55,958.14

Rp

486,405.34

Jumlah Total

Rp

101,920.80

Rp

828,160.64

Rp Rp

18,491.63 948,573.07

Rp

123,314.50

Rp

1,071,887.57

Jumlah Total

Rp

247,896.00

Rp

719,254.00

Rp Rp

12,352.41 979,502.41

Rp

127,335.31

Rp

1,106,837.72

Jumlah Total

Rp

100,436.00

Rp

1,150,200.00

Rp Rp

1,250,636.00

Rp

162,582.68

Rp

1,413,218.68

Jumlah Total

Rp

101,920.80

Rp

880,010.93

Rp Rp

18,491.63 1,000,423.36

Rp

130,055.04

Rp

1,130,478.39

Jumlah Total

Rp

59,696.00

Rp

101,935.00

Rp Rp

161,631.00

Rp

21,012.03

Rp

182,643.03

Jumlah Total

Rp

20,612.52

Rp

173,027.08

Rp

193,639.60

Jumlah Total

Rp

150,660.00

Rp

667,558.50

Rp Rp

12,352.41 830,570.91

Rp

107,974.22

Rp

938,545.12

Jumlah Total

Rp

174,847.00

Rp

3,690.00

Rp Rp

6,250.00 184,787.00

Rp

24,022.31

Rp

208,809.31

Jumlah Total

Rp

247,896.00

Rp

616,890.00

Rp Rp

12,352.41 877,138.41

Rp

114,027.99

Rp

991,166.40

Jumlah Total

Rp

6,245.00

Rp

10,474.00

Rp

16,719.00

Jumlah Total

30,132.00

16,619.59

46,751.59 6,077.71 52,829.30

Jumlah Total (Rp)

18,078.00

199,920.00

217,998.00 28,339.74 246,337.74

Jumlah Total

-

-

Jumlah Total

-

-

Jumlah Total

-

-

Jumlah Total

-

-

Jumlah Total

-

-

Jumlah Total

-

-

Jumlah Total

-

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak TEMPAT PEKERJAAN 1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten No

: : Banyumeneng : Mranggen : Demak Uraian Pekerjaan

1 I

2 PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan 4 Pembongkaran beton jembatan 5 Pembongkaran Abutment Jembatan 6 Persiapan Pemanfaatan Kembali bongkaran Bt Belah II PEKERJAAN TANAH 1 Pekj. Galian Tanah 2 Pekj. Urugan kembali II PEKERJAAN JEMBATAN 6 m X 3 m 1 Pekj. Pancang Cerucuk Bambu 2 Pekj. Urugan pasir Dasar 3 Pekj. Beton Nol (Non struktur K. 125) 4 Pekj. Anstamping 5 Pekj. Beton Plat Meja K. 175 6 Pekj. Pas. Batu belah 1Pc : 4Ps 7 Bambu Perancah 8 Pekj. Begisting Kayu 9 Pekj. Penulangan Beton - Pembesian Ø 19 mm - Pembesian Ø 12 mm - Pembesian Ø 10 mm - Pembesian Ø 8 mm - Pembesian Ø 6 mm 10 Pekj. Beton K.225 (Molen) 11 Pekj. Beton K.175 (molen) 12 Kawat Bendrat 13 Pekj. Pipa Galvanis Ø 2,5" x 6 m 14 Dop Tutup Pipa leuning 15 Pekj. Book Batu Belah 1Pc : 6 Ps 16 Pekj. Plesteran 1Pc : 5Ps tbl 15 mm 17 Perkuatan Jalan 18 Pas. Batu Belah 1Pc : 5Ps 19 Pekerjaan Opritan - Urugan Sirtu - Beton K. 175 20 Pekj. Pengecatan

Harga Perkiraan Sendiri (HPS) untuk : PEMBANGUNAN JEMBATAN KARANGLO BANYUMENENG KEC. MRANGGEN Kegiatan APBD Perubahan Kabupaten Demak Tahun 2015 Volume

Analis

3

4

Harga Satuan ( Rp. ) 5

Jumlah Harga ( Rp. ) 6

1.00 Ls 1.00 Ls 1.00 Ls 2.22 m3 25.35 m3 10.82 m3

Taksir Taksir Taksir B.39 P.01e P.01f

600,000.00 700,000.00 250,000.00 208,809.31 142,168.69 15,758.98

600,000.00 700,000.00 250,000.00 463,556.67 3,603,976.29 170,575.20

31.68 m3 5.28 m3

T. 06a T. 14a

50,326.25 24,603.94

1,594,335.44 129,908.81

30.40 m' 0.99 m3 0.99 m3 5.94 m3 3.96 m3 38.55 m3 91.00 btg 33.84 m2

P. 07b T. 14c B. 03b A.3.2.1.9 B.051b P. 01c Taksir B.21

6,578.97 188,474.96 1,007,051.85 486,405.34 1,071,887.57 1,106,837.72 18,000.00 182,643.03

200,000.78 186,590.21 996,981.34 2,889,247.70 4,244,674.77 42,668,594.08 1,638,000.00 6,180,640.14

568.18 kg 352.71 kg 68.91 kg 365.68 kg 11.94 kg 7.08 m3 2.46 m3 12.42 Kg 36.00 m' 8.00 buah 1.92 m3 66.13 m2

B.17 B.17 B.17 B.17 B.17 B. 07b B.051b 1,6,23 A.3.2.1.4 A.4.4.2.5

14,132.19 14,132.19 14,132.19 14,132.19 14,132.19 1,130,478.39 1,071,887.57 17,800.00 193,639.60 35,000.00 938,545.12 52,829.30

8,029,569.37 4,984,581.41 973,800.38 5,167,834.89 168,789.19 8,003,787.01 2,636,843.42 221,003.47 6,971,025.72 280,000.00 1,802,006.64 3,493,601.54

23.35 m3

P. 01d

991,166.40

23,142,803.73

2.69 m3 2.70 m3 24.76 m2

Dihit B. 051b 1.6,14

246,337.74 1,071,887.57 16,719.00 : Jumlah PPN 10 % : Jumlah Total : : Dibulatkan

662894.85834 2,894,096.43 413,962.44

Terbilang : (Seratus Lima Puluh Juta Rupiah)

Demak,

2015

KASI PERTAMANAN DAN PEMAKAMAN PADA BIDANG KEBERSIHAN DAN PJU

DPU PPE KABUPATEN DEMAK SELAKU PEJABAT PEMBUAT KOMITMEN

ANDI ERWIN PRASETYO, ST NIP. 19720914 200312 1 002

KOP PERUSAHAAN

BILL OF QUANTITY (BQ) TEMPAT PEKERJAAN 1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten No

: : Banyumeneng : Mranggen : Demak Uraian Pekerjaan

1 I

2 PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan 4 Pembongkaran beton jembatan 5 Pembongkaran Abutment Jembatan 6 Persiapan Pemanfaatan Kembali bongkaran Bt Belah II PEKERJAAN TANAH 1 Pekj. Galian Tanah 2 Pekj. Urugan kembali II PEKERJAAN JEMBATAN 6 m X 3 m 1 Pekj. Pancang Cerucuk Bambu 2 Pekj. Urugan pasir Dasar 3 Pekj. Beton Nol (Non struktur K. 125) 4 Pekj. Anstamping 5 Pekj. Beton Plat Meja K. 175 6 Pekj. Pas. Batu belah 1Pc : 4Ps 7 Bambu Perancah 8 Pekj. Begisting Kayu 9 Pekj. Penulangan Beton - Pembesian Ø 19 mm - Pembesian Ø 12 mm - Pembesian Ø 10 mm - Pembesian Ø 8 mm - Pembesian Ø 6 mm 10 Pekj. Beton K.225 (Molen) 11 Pekj. Beton K.175 (molen) 12 Kawat Bendrat 13 Pekj. Pipa Galvanis Ø 2,5" x 6 m 14 Dop Tutup Pipa leuning 15 Pekj. Book Batu Belah 1Pc : 6 Ps 16 Pekj. Plesteran 1Pc : 5Ps tbl 15 mm 17 Perkuatan Jalan 18 Pas. Batu Belah 1Pc : 5Ps 19 Pekerjaan Opritan - Urugan Sirtu - Beton K. 175 20 Pekj. Pengecatan

Harga Perkiraan Sendiri (HPS) untuk : PEMBANGUNAN JEMBATAN KARANGLO BANYUMENENG KEC. MRANGGEN Kegiatan APBD Perubahan Kabupaten Demak Tahun 2015 Volume

Analis

3

4

Harga Satuan ( Rp. ) 5

1.00 Ls 1.00 Ls 1.00 Ls 2.22 m3 25.35 m3 10.82 m3

Taksir Taksir Taksir B.39 P.01e P.01f

-

-

31.68 m3 5.28 m3

T. 06a T. 14a

-

-

30.40 m' 0.99 m3 0.99 m3 5.94 m3 3.96 m3 38.55 m3 91.00 btg 33.84 m2

P. 07b T. 14c B. 03b A.3.2.1.9 B.051b P. 01c Taksir B.21

-

-

568.18 kg 352.71 kg 68.91 kg 365.68 kg 11.94 kg 7.08 m3 2.46 m3 12.42 Kg 36.00 m' 8.00 buah 1.92 m3 66.13 m2

B.17 B.17 B.17 B.17 B.17 B. 07b B.051b 1,6,23 A.3.2.1.4 A.4.4.2.5

-

-

23.35 m3

P. 01d

-

-

2.69 m3 2.70 m3 24.76 m2

Dihit B. 051b 1.6,14

-

-

Jumlah PPN 10 % Jumlah Total Dibulatkan Terbilang :

Jumlah Harga ( Rp. ) 6

: : : :

( .................................................................... )

Demak,

2015

dibuat oleh PT. / CV ………………………………….

…………………………….. DIREKTUR

N DAN ENERGI mak

O BANYUMENENG KEC.

PERHITUNGAN VOLUME PEKERJAAN JEMBATAN BETON : PEMBANGUNAN JEMBATAN KARANGLO BANYUMENENG KEC. MRANGGEN Uk. 6,00 m x 3,00 m x 0,20 m I PEKERJAAN TANAH No Pekerjaan P 1 Pekj. Galian Tanah 6.60 2 Pekj. Urugan kembali 6.60

L 1.50

T 1.60

Hit =6,60/1+1

J1 7.60

Hit =1+1

Demak Tahun 2015 II No

PEKERJAAN JEMBATAN 6 m X 3 m Pekerjaan 1 Pekj. Pancang Cerucuk Bambu

No

Pekerjaan 2 Pekj. Urugan pasir Dasar

P 6.60

L 1.50

T 0.05

No

Pekerjaan 3 Pekj. Beton nol (beton non Struktur K.125)

P 6.60

L 1.50

T 0.05

5,788,108.16

No

Pekerjaan 4 Pekj. Anstamping

P 6.60

L 1.50

T 0.30

1,724,244.26

No

Pekerjaan 5 Pekj. Beton Plat Meja K.175 Penulangan Melintang 1 Ø 8 mm Melintang 2 Ø 8 mm Memanjang Ø 8 mm

P 6.60 Hit =0,07+0,14+1,44+0,14+1,44+0,07 =0,07+0,14+1,44+0,14+1,44+0,07+0,51 =0,07+4,94+0,07

L 1.50 p 1.86 2.37 5.08

Berat Besi Plat meja 92.59

Per 10

P 6.60

T 4.10

Harga Total ( Rp. ) 7

Kawat Bendrat

No

Uraian Pekerjaan 6 Pekj. Pas. Batu belah 1Pc : 4Ps Balok Tumpu balok Gelagar

B No 128,851,329.51 136,363,681.93 13,636,368.19 150,000,050.12 150,000,000.00

Uraian Pekerjaan Total Volume pas Batu Belah

Volume Pa.s bt belah 40.59

Uraian Pekerjaan Plesteran + acian Abutment

=1,5+3,6+1,5

PEKJ. BALOK TUMPU Pekerjaan 1 BALOK TUMPU Beton K. 225 2 PEKJ. PENULANGAN Ø 10 mm a Tul. balok Tumpu Ø 10 mm

b Beugel Blk Tumpu Ø 8 mm

2015

AN DAN PEMAKAMAN EBERSIHAN DAN PJU

Kawat Bendrat

A

7 0.4

PEKJ. BETON GELAGAR (2 Buah)

hit

P 7 Hit =0,05+1.44+0,5+3+0,5+1.44+0,05

Hit =0,05+0,24+0,34+0,24+0,34+0,05

Berat Besi balok tumpu 35.83

T 0.20 Hit 17.5 17.5 8.5 Berat Besi P Berat Besi P Koef kawat 0.1500

L 1.00 Pas. Batu bela 0.40 0.30 0.50 0.30 Vol. Balok Tumpu Dan B Vol blk Tumpu dan Gelagar 2.04 p 6.6

L 0.40 P 6.98

2.6

T 0.30

Berat besi Tul.per 1 Berat besi Tul. per 2 P Hit 1.26 =7/0,2+1 Berat Besi begel Per 1 Berat Besi begel Per 2 Per Koef kawat 10 0.1500

ABUPATEN DEMAK

No

MBUAT KOMITMEN

N PRASETYO, ST 914 200312 1 002

Pekerjaan P 1 BETON GELAGAR Beton Struktur K.225 6 2 PEKJ. PENULANGAN Ø 19 mm Hit. Tul balok Gelagar =0,07+5,94+0,07

3 PEKJ. PENULANGAN Beugel Ø 10 mm Hit. a Beugel balok Gelagar =0,7+0,24+0.64+0,24+0,64+0,7

Kawat Bendrat

C No

D No

Berat Besi balok gelagar 181.32

PEKJ. BEGESTING Pekerjaan 1 BEGESTING Kayu Tahun a Begesting Plat jembatan b Begesting Gelagar

=((0,22+0,50)*2)+0,8+0,8 =0,5+0,3+0,5

c bambu perancah

=6/0,5+1

hit.

PEKJ. LANTAI JEMBATAN BETON Pekerjaan P 1 Beton Lantai jembatan Struktur k.225 6.00 2 PEKERJAAN PENULANGAN Hit. Tulangan melintang 1. Ø12 mm =0.05+0.15+2.94+0.15+0.05 Tulangan melintang 2. Ø12 mm =0.05+2.94+0.05

Tulangan memanjang 1. Ø12 mm Tulangan memanjang 2. Ø12 mm

=0.05+0.15+5.94+0.15+0.05 =0.05+5.94+0.05

Kawat Bendrat

Berat Besi lantai jembatan 352.71 hit 6.00

Uraian Pekerjaan Plesteran + acian

PEKJ. TIANG LEUNNING Uraian Pekerjaan P 1 TIANG LEUNNING Beton Struktur K. 17 1.00 No PEKJ. PENULANGAN Ø 8 mm hit =(0,05+0,13)x2)+0,18+0,85+0,12,56+ 2 Tul Tiang Leunning Ø 8 mm 0,90+0,31 F No

Beugel Tiang Leunning Ø 6 mm

Kawat Bendrat Plesteran + acian

hit =0,05+0,12+0,08+0,12+0,08+0,05

Berat Besi tiang leunning 149.27 1.00

T L 0.30 0.50 P jlh 6.08 14 Berat Besi Tul. Gelagar Per 1 Berat Besi Tul. Gelagar Per 3 P 3.16

Hit =6,00/0,20+1

Berat Besi Beugel Per 1 B Berat Besi Beugel Per 3 B Per Koef kawat 10 0.1500

L

P

3.04 6 1.3 6 Begesting Gelagar + Plat la pj(Titik) 13 =3/0,5+1

T L 3.00 0.20 P Hit. 3.34 =6,00/0.20+1 3.04 =6,00/0.20+1 Berat besi lanta

6.34 =3,00/0,20+1 6.04 =3,00/0,20+1 Berat besi lantai t Jumlah berat besi la Per Koef kawat 10 0.1500 p 0.3

L 0.15 p 15.16

T 0.12 hit

total Berat Bes hit 0.5 =1,00/0,2 Berat Besi begel. Per 1 Berat Besi begel. Per 10 T Total berat Per Koef kawat 10 0.1500 0.66 p

G No

PEKJ. BALOK SANDUNG Pekerjaan 1 BALOK SANDUNG Beton Struktur K. 175 2 PENULANGAN Ø 8 mm Tul B. Sandung Ø 8 mm

Beugel B. Sandung Ø 6 mm

Kawat Bendrat

P 3 hit =0,05+2,94+0,05

hit =0,05+0,24+0,16+0,24+0,16+0,05

Berat Besi balok sandung 16.00

PEK. BOOK PAS. BT BELAH 1PC : 6PS Uraian Pekerjaan Pekj. Book Pas. Bt belah 1Pc : 6Ps Uraian Pekerjaan Plesteran + acian book beton

No

No

Pek. Bongkaran Beton Uraian Pekerjaan lantai Jembatan Gelagar

Uraian Pekerjaan Pek. Bongkar Pas batu belah pemanfaatan kembali bt belah

6 Pek. Perkuatan Jalan 1

Uraian Pekerjaan Plesteran + Acian perkuatan Jl 1

T L 0.20 0.3 Volume B. sandung p P 3.04 Berat besi Tul. Per 1 B Berat besi Tul. Per 2 B P 0.90 =3,00/0,2+1 Berat Besi begel Per 1 b Berat Besi begel Per 2 B Total berat besi b Per Koef kawat 10 0.1500

P

L 1.50

hit =1,5 x (0,8+0,4+0,8) =0,8 x 0,4

T 0.80

0.4

p 3.00 0.32

P 3 3

L 2.5 0.4

P 6.5

L 1.30

6.60 54.12

4.10 20%

T 0.20 0.3

T 3.00

Vol Pas bt belah(abutment)

9.00

p 9

1.00

1.50 0.40 Pas. Batu belah u/ Pe l 0.43

6 Pek. Perkuatan Jalan 2

6.00

4.30 0.70 Pas. Batu belah u/ Pe

Uraian Pekerjaan Plesteran + Acian perkuatan Jl 2

p 6.00

l 0.53

Opritan Urugan Sirtu Beton K.225

P 6.00 6.00

L

PERHITUNGAN VOLUME PEKERJAAN JEMBATAN BETON : PEMBANGUNAN JEMBATAN KARANGLO BANYUMENENG KEC. MRANGGEN

T 3.00 3.00

0.15 0.15

Uk. 6,00 m x 3,00 m x 0,20 m I PEKERJAAN TANAH No Pekerjaan 1 Pekj. Galian Tanah 2 Pekj. Urugan kembali

O BANYUMENENG KEC.

P 6.60 6.60

L 1.50

T 1.60

Hit =6,60/1+1

J1 7.60

Hit =1+1

Demak Tahun 2015 II No

PEKERJAAN JEMBATAN 6 m X 3 m Pekerjaan 1 Pekj. Pancang Cerucuk Bambu

No

Pekerjaan 2 Pekj. Urugan pasir Dasar

P 6.60

L 1.50

T 0.05

No

Pekerjaan 3 Pekj. Beton nol (beton non Struktur K.125)

P 6.60

L 1.50

T 0.05

-

No

Pekerjaan 4 Pekj. Anstamping

P 6.60

L 1.50

T 0.30

-

No

Pekerjaan 5 Pekj. Beton Plat Meja K.175 Penulangan Melintang 1 Ø 8 mm Melintang 2 Ø 8 mm Memanjang Ø 8 mm

P 6.60 Hit =0,07+0,14+1,44+0,14+1,44+0,07 =0,07+0,14+1,44+0,14+1,44+0,07+0,51 =0,07+4,94+0,07

L 1.50 p 1.86 2.37 5.08

Berat Besi Plat meja 92.59

Per 10

P 6.60

T 4.10

Harga Total ( Rp. ) 7

Kawat Bendrat

No

Uraian Pekerjaan 6 Pekj. Pas. Batu belah 1Pc : 4Ps Balok Tumpu balok Gelagar Uraian Pekerjaan Total Volume pas Batu Belah Uraian Pekerjaan Plesteran + acian Abutment

B No -

PEKJ. BALOK TUMPU Pekerjaan 1 BALOK TUMPU Beton K. 225 2 PEKJ. PENULANGAN Ø 10 mm a Tul. balok Tumpu Ø 10 mm

b Beugel Blk Tumpu Ø 8 mm

2015

…………………………..

Kawat Bendrat

A No

PEKJ. BETON GELAGAR (2 Buah) Pekerjaan 1 BETON GELAGAR Beton Struktur K.225 2 PEKJ. PENULANGAN Ø 19 mm

7 0.4 Volume Pa.s bt belah 40.59 hit

T 0.20 Hit 17.5 17.5 8.5 Berat Besi P Berat Besi P Koef kawat 0.1500

L 1.00 Pas. Batu bela 0.40 0.30 0.50 0.30 Vol. Balok Tumpu Dan B Vol blk Tumpu dan Gelagar 2.04 p

=1,5+3,6+1,5

6.6

P 7 Hit =0,05+1.44+0,5+3+0,5+1.44+0,05

Hit =0,05+0,24+0,34+0,24+0,34+0,05

Berat Besi balok tumpu 35.83

P 6 Hit.

L 0.40 P 6.98

2.6

T 0.30

Berat besi Tul.per 1 Berat besi Tul. per 2 P Hit 1.26 =7/0,2+1 Berat Besi begel Per 1 Berat Besi begel Per 2 Per Koef kawat 10 0.1500

L 0.30 P

T 0.50 jlh

…………………..

Tul balok Gelagar

=0,07+5,94+0,07

6.08 14 Berat Besi Tul. Gelagar Per 1 Berat Besi Tul. Gelagar Per 3

3 PEKJ. PENULANGAN Beugel Ø 10 mm Hit. a Beugel balok Gelagar =0,7+0,24+0.64+0,24+0,64+0,7

Kawat Bendrat

C No

D No

Berat Besi balok gelagar 181.32

PEKJ. BEGESTING Pekerjaan 1 BEGESTING Kayu Tahun a Begesting Plat jembatan b Begesting Gelagar

=((0,22+0,50)*2)+0,8+0,8 =0,5+0,3+0,5

c bambu perancah

=6/0,5+1

hit.

PEKJ. LANTAI JEMBATAN BETON Pekerjaan P 1 Beton Lantai jembatan Struktur k.225 6.00 2 PEKERJAAN PENULANGAN Hit. Tulangan melintang 1. Ø12 mm =0.05+0.15+2.94+0.15+0.05 Tulangan melintang 2. Ø12 mm =0.05+2.94+0.05

Tulangan memanjang 1. Ø12 mm Tulangan memanjang 2. Ø12 mm

=0.05+0.15+5.94+0.15+0.05 =0.05+5.94+0.05

Kawat Bendrat

Berat Besi lantai jembatan 352.71 hit 6.00

Uraian Pekerjaan Plesteran + acian

PEKJ. TIANG LEUNNING Uraian Pekerjaan P 1 TIANG LEUNNING Beton Struktur K. 17 1.00 No PEKJ. PENULANGAN Ø 8 mm hit =(0,05+0,13)x2)+0,18+0,85+0,12,56+ 2 Tul Tiang Leunning Ø 8 mm 0,90+0,31 F No

Beugel Tiang Leunning Ø 6 mm

Kawat Bendrat Plesteran + acian G No

PEKJ. BALOK SANDUNG Pekerjaan

hit =0,05+0,12+0,08+0,12+0,08+0,05

Berat Besi tiang leunning 149.27 1.00

P

P 3.16

Hit =6,00/0,20+1

Berat Besi Beugel Per 1 B Berat Besi Beugel Per 3 B Per Koef kawat 10 0.1500

L

P

3.04 6 1.3 6 Begesting Gelagar + Plat la pj(Titik) 13 =3/0,5+1

T L 3.00 0.20 P Hit. 3.34 =6,00/0.20+1 3.04 =6,00/0.20+1 Berat besi lanta

6.34 =3,00/0,20+1 6.04 =3,00/0,20+1 Berat besi lantai t Jumlah berat besi la Per Koef kawat 10 0.1500 p 0.3

L 0.15 p 15.16

T 0.12 hit

total Berat Bes p hit 0.5 =1,00/0,2 Berat Besi begel. Per 1 Berat Besi begel. Per 10 T Total berat Per Koef kawat 10 0.1500 0.66

T

L

1 BALOK SANDUNG Beton Struktur K. 175 2 PENULANGAN Ø 8 mm Tul B. Sandung Ø 8 mm

Beugel B. Sandung Ø 6 mm

Kawat Bendrat

3 hit =0,05+2,94+0,05

hit =0,05+0,24+0,16+0,24+0,16+0,05

Berat Besi balok sandung 16.00

PEK. BOOK PAS. BT BELAH 1PC : 6PS Uraian Pekerjaan Pekj. Book Pas. Bt belah 1Pc : 6Ps Uraian Pekerjaan Plesteran + acian book beton

No

No

Pek. Bongkaran Beton Uraian Pekerjaan lantai Jembatan Gelagar

Uraian Pekerjaan Pek. Bongkar Pas batu belah pemanfaatan kembali bt belah

6 Pek. Perkuatan Jalan 1

Uraian Pekerjaan Plesteran + Acian perkuatan Jl 1

6 Pek. Perkuatan Jalan 2

0.20 0.3 Volume B. sandung p P 3.04 Berat besi Tul. Per 1 B Berat besi Tul. Per 2 B P 0.90 =3,00/0,2+1 Berat Besi begel Per 1 b Berat Besi begel Per 2 B Total berat besi b Per Koef kawat 10 0.1500

P

L 1.50

hit =1,5 x (0,8+0,4+0,8) =0,8 x 0,4

T 0.80

0.4

p 3.00 0.32

P 3 3

L 2.5 0.4

P 6.5

L 1.30

6.60 54.12

4.10 20%

T 0.20 0.3

T 3.00

Vol Pas bt belah(abutment)

9.00

p 9

6.00

1.00

1.50 0.40 Pas. Batu belah u/ Pe l 0.43

4.30 0.70 Pas. Batu belah u/ Pe

Uraian Pekerjaan Plesteran + Acian perkuatan Jl 2

p 6.00

l 0.53

Opritan Urugan Sirtu Beton K.225

P 6.00 6.00

L

T 3.00 3.00

0.15 0.15

q 2 3

n 2.4

Volume Sat. Ket. 31.68 m3 V= p*l*t*q 5.28 m3 V= p*n*/q

J2 2

q 2

Volume Sat. Ket. V= j1*j2*q 30.40 m'

q 2

n

Volume Sat. Ket. 0.99 m3 V= p*l*t*q

q 2

n

Volume Sat. 0.99 m3

q 2

n

Volume Sat. Ket. 5.94 m3 V= p*l*t*q

q n 2 Koef 0.395 0.395 0.395 Berat Besi Per 1 Plat Meja Berat Besi Per 2 Plat Meja

q 75% Pas. Batu belah 2 Abutment 2 6 ok Tumpu Dan Balok Gelagar u dan Gelagar

Volume Sat. 3.96 m3 Volume Sat. 12.86 Kg 16.38 Kg 17.06 Kg 46.30 Kg 92.59 Kg Volume Sat. 1.39 Kg

Ket.

Ket. Ket.

Ket.

Volume Sat. Ket. 20.30 m3 V= p*t*l 40.59 m3 1.68 m3 0.36 m3 2.04 m3 38.55 m3

q 2

q n 2 jlh Koef 8 0.617 at besi Tul.per 1 Balok Tumpu at besi Tul. per 2 Balok Tumpu jlh Koef 36.00 0.395 Besi begel Per 1 Balok Tumpu Besi begel Per 2 Balok Tumpu

Volume Sat. Ket. 34.32 m2 v=p*q 34.32 m2 v=p*q

Volume Sat. Ket. 1.68 m3 V= p*l*t*q Ket. Volume Sat. V= p*j*K 34.45 Kg 34.45 Kg 68.91 kg Ket. Volume Sat. V= p*j*K 17.92 Kg 17.92 kg 35.83 kg Volume Sat. Ket. 0.54 Kg

5.44

q 2

n

q

Koef 2.225 . Gelagar Per 1 balok Gelagar . Gelagar Per 3 balok Gelagar j Koef 31.00 0.617

si Beugel Per 1 Balok Gelagar si Beugel Per 3 Balok Gelagar

q

n

Volume Sat. Ket. V= p*l*t*q 1.80 Ket. Volume Sat. V= p*j*K 189.39 kg 189.39 kg 568.18 kg Volume Sat. Ket. V= p*j*K 60.44 kg 60.44 kg 181.32 kg Volume Sat. 2.72 Kg

Volume

Sat.

18.24 m2 2 15.6 m2 Gelagar + Plat lantai Jembatan 33.84 m2 L (Titik) Volume 7 91.00 btg

q

n

jlh Koef 31.00 0.891 31.00 0.891 Berat besi lantai tul melintang

16 0.891 16 0.891 erat besi lantai tul memanjang mlah berat besi lantai jembatan

q 2

q 10 jlh

n

Koef 2 0.395 total Berat Besi Tul Leunning jlh Koef 5 0.222 esi begel. Per 1 Tiang leuning si begel. Per 10 Tiang Leuning Total berat besi leunning

10

Ket.

Ket. V=l*p V=l*p*q

V= p*l

Volume Sat. Ket. 3.60 m3 V= p*l*t Volume Sat. Ket. V= p*j*k 92.25 kg V=p*j*k 83.97 kg 176.22 V=p*j*k 90.38 kg V=p*j*k 86.11 kg 176.49 kg 352.71 kg Volume Sat. Ket. 5.29 Kg Volume Sat. Ket. 3.60 m2 v=p*l*j

Volume Sat. 0.18 m3 Volume Sat. 11.98 kg 143.72 kg Volume Sat. 0.56 kg 0.56 kg 5.55 kg 149.27 kg Volume Sat. 2.24 Kg 6.60 m2

Ket. V= p*l*t*q Ket. V=p*j*k Ket. V=p*j*k

Ket. v=p*l*j

q

n

me B. sandung per 2 Abutment jlh Koef 4 0.395 besi Tul. Per 1 Balok Sandung besi Tul. Per 2 Balok Sandung jlh Koef 16.00 0.222 esi begel Per 1 balok sandung esi begel Per 2 Balok sandung Total berat besi balok sandung

q 4 q

Volume Sat. Ket. 1.92 m3 v=p*l*t*q Volume

4 8

q

Sat. Ket. 12 m2 v=p*q 2.56 m2 v=p*q 14.56 m2 v=p*q

2

Volume Sat. Ket. 1.50 m3 V=p* l*t/2 0.72

1

Volume Sat. 25.35

q

2.00

Batu belah u/ Perkuatan Jalan q

Volume Sat. Ket. 0.18 m3 V=p*t*l 0.36 m3 Ket. Volume Sat. V=p*j*k 4.80 kg 4.80 kg 9.61 kg Ket. Volume Sat. V=p*j*k 3.20 kg 3.20 kg 6.39 kg 16.00 kg Volume Sat. Ket. 0.24 Kg

Ket.

54.12 10.82

5.40 m3 5.40 m3

V= p*t*l

Volume Sat. Ket. 3.87 m2 v=p*q 3.87 m2 v=p*q

Batu belah u/ Perkuatan Jalan q

17.95 m3 V= p*t*l 17.95 m3 23.35 Volume Sat. Ket. 3.18 m2 v=p*q 3.18 m2 v=p*q Volume Sat. 2.69 m3 2.70 m3

Ket.

q 2 3

n 2.4

Volume Sat. Ket. 31.68 m3 V= p*l*t*q 5.28 m3 V= p*n*/q

J2 2

q 2

Volume Sat. Ket. V= j1*j2*q 30.40 m'

q 2

n

Volume Sat. Ket. 0.99 m3 V= p*l*t*q

q 2

n

Volume Sat. 0.99 m3

q 2

n

Volume Sat. Ket. V= p*l*t*q 5.94 m3

q n 2 Koef 0.395 0.395 0.395 Berat Besi Per 1 Plat Meja Berat Besi Per 2 Plat Meja

q 75% Pas. Batu belah 2 Abutment 2 6 ok Tumpu Dan Balok Gelagar u dan Gelagar

Volume Sat. 3.96 m3 Volume Sat. 12.86 Kg 16.38 Kg 17.06 Kg 46.30 Kg 92.59 Kg Volume Sat. 1.39 Kg

Ket.

Ket. Ket.

Ket.

Volume Sat. Ket. 20.30 m3 V= p*t*l 40.59 m3 1.68 m3 0.36 m3 2.04 m3 38.55 m3

q

Volume Sat. Ket. 34.32 m2 v=p*q 34.32 m2 v=p*q

2

q n 2 jlh Koef 8 0.617 at besi Tul.per 1 Balok Tumpu at besi Tul. per 2 Balok Tumpu jlh Koef 36.00 0.395 Besi begel Per 1 Balok Tumpu Besi begel Per 2 Balok Tumpu

q 2 q

n Koef

Volume Sat. Ket. 1.68 m3 V= p*l*t*q Ket. Volume Sat. V= p*j*K 34.45 Kg 34.45 Kg 68.91 kg Ket. Volume Sat. V= p*j*K 17.92 Kg 17.92 kg 35.83 kg Volume Sat. Ket. 0.54 Kg

Volume Sat. Ket. V= p*l*t*q 1.80 Ket. Volume Sat.

5.44

2.225 . Gelagar Per 1 balok Gelagar . Gelagar Per 3 balok Gelagar j Koef 31.00 0.617

si Beugel Per 1 Balok Gelagar si Beugel Per 3 Balok Gelagar

q

n

189.39 kg 189.39 kg 568.18 kg

Volume Sat. Ket. V= p*j*K 60.44 kg 60.44 kg 181.32 kg Volume Sat. 2.72 Kg

Volume

Sat.

18.24 m2 2 15.6 m2 Gelagar + Plat lantai Jembatan 33.84 m2 L (Titik) Volume 7 91.00 btg

q

n

jlh Koef 31.00 0.891 31.00 0.891 Berat besi lantai tul melintang

16 0.891 16 0.891 erat besi lantai tul memanjang mlah berat besi lantai jembatan

q 2

q 10 jlh

n

Koef 2 0.395 total Berat Besi Tul Leunning jlh Koef 5 0.222 esi begel. Per 1 Tiang leuning si begel. Per 10 Tiang Leuning Total berat besi leunning

10

q

n

V= p*j*K

Ket.

Ket. V=l*p V=l*p*q

V= p*l

Volume Sat. Ket. 3.60 m3 V= p*l*t Volume Sat. Ket. V= p*j*k 92.25 kg V=p*j*k 83.97 kg 176.22 V=p*j*k 90.38 kg V=p*j*k 86.11 kg 176.49 kg 352.71 kg Volume Sat. Ket. 5.29 Kg Volume Sat. Ket. 3.60 m2 v=p*l*j

Volume Sat. 0.18 m3 Volume Sat. 11.98 kg 143.72 kg Volume Sat. 0.56 kg 0.56 kg 5.55 kg 149.27 kg Volume Sat. 2.24 Kg 6.60 m2

Volume

Sat.

Ket. V= p*l*t*q Ket. V=p*j*k Ket. V=p*j*k

Ket. v=p*l*j

Ket.

me B. sandung per 2 Abutment jlh Koef 4 0.395 besi Tul. Per 1 Balok Sandung besi Tul. Per 2 Balok Sandung jlh Koef 16.00 0.222 esi begel Per 1 balok sandung esi begel Per 2 Balok sandung Total berat besi balok sandung

q 4 q

0.18 m3 V=p*t*l 0.36 m3 Ket. Volume Sat. V=p*j*k 4.80 kg 4.80 kg 9.61 kg Ket. Volume Sat. V=p*j*k 3.20 kg 3.20 kg 6.39 kg 16.00 kg Volume Sat. Ket. 0.24 Kg

Volume Sat. Ket. 1.92 m3 v=p*l*t*q Volume

4 8

q

Sat. Ket. 12 m2 v=p*q 2.56 m2 v=p*q 14.56 m2 v=p*q

2

Volume Sat. Ket. 1.50 m3 V=p* l*t/2 0.72

1

Volume Sat. 25.35

q

2.00

Batu belah u/ Perkuatan Jalan q

Batu belah u/ Perkuatan Jalan

Ket.

54.12 10.82

5.40 m3 5.40 m3

V= p*t*l

Volume Sat. Ket. 3.87 m2 v=p*q 3.87 m2 v=p*q

17.95 m3 17.95 m3

V= p*t*l

q

23.35 Volume Sat. Ket. 3.18 m2 v=p*q 3.18 m2 v=p*q Volume Sat. 2.69 m3 2.70 m3

Ket.

T.06a No A

1 m3 galian tanah biasa sedalam s.d 1 m Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan

Koefisien

OH OH

Harga Satuan

0.5630 Rp 0.0563 Rp

57,400.00 Rp 85,800.00 Rp

Jumlah harga 32,316.20 4,830.54

Jumlah Harga Tenaga Kerja B

Bahan

C

Peralatn

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Jumlah Harga Bahan Jumlah Harga Peralatan

T.14a No A

13 X D

1 m3 urugan tanah kembali (1 m3) Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan

Koefisien

OH OH

Harga Satuan

0.3300 Rp 0.0330 Rp

57,400.00 Rp 85,800.00 Rp

Jumlah harga 18,942.00 2,831.40

Jumlah Harga Tenaga Kerja B

Bahan Jumlah Harga Bahan

C

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

P.07b

1 m panjang cerucuk bambu diameter 8 cm - 10 cm

No A

B

Uraian Tenaga Pekerja Mandor Operator Tripod *)

Kode

Bahan bambu dia. 8 cm -10 cm

C

13 X D

Satuan

Koefisien

Harga Satuan

Jumlah harga

OH OH OH

0.036 Rp 57,400.00 Rp 0.004 Rp 85,800.00 Rp 0.006 Rp - Rp Jumlah Harga Tenaga Kerja

2,066.40 343.20 -

m'

1.05 Rp 3,250.00 Rp Jumlah Harga Bahan

3,412.50

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

P.01c

1 m3 Pasangan Batu Campuran 1 PC : 4 PP No

A

Uraian Tenaga Pekerja

Kode

13 X D

Satuan OH

Koefisien 2.7000 Rp

Harga Satuan 57,400.00 Rp

Jumlah harga 154,980.00

B

C

Tukang Kepala Tukang Mandor

OH OH OH

0.9000 Rp 70,000.00 Rp 0.0900 Rp 75,000.00 Rp 0.2700 Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

63,000.00 6,750.00 23,166.00

Bahan Batu Belah 15/20 Pasir Beton Semen

m3 m3 kg

1.200 Rp 251,300.00 Rp 0.520 Rp 352,500.00 Rp 163 Rp 1,438.00 Rp Jumlah Harga Bahan

301,560.00 183,300.00 234,394.00

0.167 Rp 73,966.51 Rp Jumlah Harga Peralatan

12,352.41

Peralatan Molen (sewa-hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.21

13 X D

D

1 m2 bekisting u/ permukaan beton biasa dgn multiflex 12 mm atau 18 mm (tanpa perancah) Satuan Koefisien Harga Satuan Uraian Kode Jumlah harga Tenaga Pekerja L.01 OH 0.200 Rp 57,400.00 Rp 11,480.00 Tukang kayu L.02 OH 0.600 Rp 70,000.00 Rp 42,000.00 Kepala Tukang L.03 OH 0.060 Rp 75,000.00 Rp 4,500.00 Mandor L.04 OH 0.020 Rp 85,800.00 Rp 1,716.00 Jumlah Harga Tenaga Kerja Bahan Multiflex 18 mm M.38.d 0.35 Rp lbr 160,000.00 Rp 56,000.00 Kaso 5/7 kelas III M.33.d 0.02 Rp m3 2,000,000.00 Rp 40,000.00 Paku 5 & 7 cm M.65.b 0.25 Rp kg 15,500.00 Rp 3,875.00 myk bekisting M.129 0.20 Rp L 10,300.00 Rp 2,060.00 Jumlah Harga Bahan Peralatan Jumlah Harga Peralatan Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m 2 (D+E)

B.17

Pembesian 100 kg dengan besi polos atau ulir

No A

B

C

No A

B

C

Uraian Tenaga Pekerja Tukang besi Kepala Tukang Mandor Bahan Besi beton/ulir Kawat ikat

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

M.55.d M.60

kg kg

Koefisien

Harga Satuan

0.700 0.700 0.070 0.070

Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

105 Rp 10,700.00 Rp 1.5 Rp 17,800.00 Rp Jumlah Harga Bahan

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-100 kg (D+E)

13 X D

Jumlah harga 40,180.00 49,000.00 5,250.00 6,006.00

1,123,500.00 26,700.00

B.07 b) molen No A

B

C

1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

Peralatan Molen

E.28.b

sewa hari

Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor

Koefisien 1.323 0.189 0.019 0.132

371 698 1047 215

Harga Satuan Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja Rp 1,438.00 Rp 251.79 Rp 152.83 Rp 50.00 Jumlah Harga Bahan

533,498.00 175,746.43 160,016.50 10,750.00

0.250 Rp 73,966.51 Rp Jumlah Harga Peralatan

18,491.63

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.051 b) molen No A

1 m3 beton mutu, f'c = 14,5 Mpac(K175), slump (12 ± 2) cm, w/c = 0,66

B

C

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

Peralatan Molen

E.28.b

sewa hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

75,940.20 13,230.00 1,425.00 11,325.60

Rp Rp Rp Rp

D

Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor

Jumlah harga

Koefisien 1.323 0.189 0.019 0.132

326 760 1029 215

Harga Satuan

Jumlah harga

Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja Rp 1,438.00 Rp 251.79 Rp 152.83 Rp 50.00 Jumlah Harga Bahan

75,940.20 13,230.00 1,425.00 11,325.60

Rp Rp Rp Rp

468,788.00 191,357.14 157,265.50 10,750.00

0.250 Rp 73,966.51 Rp Jumlah Harga Peralatan

18,491.63

13 X D

F

Harga Satuan Pekerjaan per-m3 (D+E)

1.6,23

1,0000 m1 memasang 1 m pipa galvanis Ø 2 "

No A

B

Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Kode

Satuan OH OH OH OH

Bahan pipa galvanis perlengkapan 35 % harga pipa

Koefisien 0.1080 0.1800 0.0180 0.0054

Harga Hatuan Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

1.2000 Rp 0.3500 Rp

m'

Jumlah harga

102,500.00 Rp 35,875.00 Rp

6,199.20 12,600.00 1,350.00 463.32

123,000.00 12,556.25

Jumlah Harga Bahan C

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm No Uraian Kode Satuan Koefisien A

B

C

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

L.01 L.03 L.03 L.04

Bahan PC PP

OH OH OH OH

Kg m3

Harga Satuan

Jumlah Harga

0.3 0.15 0.015 0.015

57,400.00 70,000.00 75,000.00 85,800.00 Jumlah Harga Tenaga Kerja

5.184 0.026

1,438.00 352,500.00 Jumlah Harga Bahan

17,220.00 10,500.00 1,125.00 1,287.00

7,454.59 9,165.00

Peralatan Jumlah Harga Peralatan

D E F 1.6,14

Jumlah (A+B+C) Overhead & Profit ( 13 %) Harga Satuan Pekerjaan (D+E)

13% x D

1,0000 m2 pengecat tembok baru ( 1 lap. Plamir, 1 lap cat dasar 2 lap. Cat penutup

No A

B

Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Kode

OH OH OH OH

Bahan Plamir cat dasar cat penutup 2 kali

C

Satuan

kg kg kg

Koefisien 0.0200 0.0630 0.0063 0.0025

Harga Hatuan

Jumlah harga

Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

0.1000 Rp 13,300.00 Rp 0.1000 Rp 25,400.00 Rp 0.2600 Rp 25,400.00 Rp Jumlah Harga Bahan

1,148.00 4,410.00 472.50 214.50

1,330.00 2,540.00 6,604.00

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU No

Uraian

Kode

Satuan

Koefisien

Harga Satuan (Rp)

Jumlah Harga (Rp)

A. 1 2

TENAGA Pekerja Mandor

OH OH

0.3000 0.0100

57,400.00 85,800.00 Jumlah Harga Tenaga Kerja

B. 1

BAHAN Bahan timbunan ( SIRTU )

m3

1.2000

166,600.00 Jumlah Harga Bahan

C.

PERALATAN

17,220.00 858.00

199,920.00

Jumlah Harga Peralatan D. E. F. P.01e No A

B

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E ) Bongkar Pasangan 1 m3 Batu Uraian Tenaga Pekerja Mandor

Kode

Satuan OH OH

Koefisien

Harga Satuan

1.8500 Rp 57,400.00 Rp 0.1850 Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

Jumlah harga 106,190.00 15,873.00

Bahan Jumlah Harga Bahan

C

Peralatan Palu Pahat/ Betel

0.050 Rp 30,000.00 Rp 0.150 Rp 15,000.00 Rp Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

13 X D

B.39 bongkar 1 m3 beton secara konvensional No Uraian Kode A Tenaga Pekerja L.01 Mandor L.04 B

C

Bahan cuka bibit

1,500.00 2,250.00

Satuan

Koefisien

Harga Satuan

Jumlah harga

OH OH

2.650 Rp 57,400.00 Rp 0.265 Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

M.118

L

1.200 Rp 3,075.00 Rp Jumlah Harga Bahan

3,690.00

E.30 E.29

bh Ls bh

0.1 Rp 62,500.00 Rp 0.2 Rp - Rp 0.5 Rp - Rp Jumlah Harga Peralatan

6,250.00 -

Peralatan Palu/godam gergaji besi pahat beton (baja keras)

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m 2 (D+E)

13 X D

152,110.00 22,737.00

T.06a No A

1 m3 galian tanah biasa sedalam s.d 1 m Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan

Koefisien

OH OH

Harga Satuan

0.5630 0.0563

Jumlah harga -

-

Jumlah Harga Tenaga Kerja B

Bahan Jumlah Harga Bahan

C

Peralatn Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

T.14a No A

13 X D

1 m3 urugan tanah kembali (1 m3) Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan

Koefisien

OH OH

Harga Satuan

0.3300 0.0330

Jumlah harga -

-

Jumlah Harga Tenaga Kerja B

Bahan

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

P.07b

1 m panjang cerucuk bambu diameter 8 cm - 10 cm

Jumlah Harga Bahan Jumlah Harga Peralatan

No A

Uraian Tenaga Pekerja Mandor Operator Tripod *)

Kode

13 X D

Satuan OH OH OH

Koefisien 0.036 0.004 0.006

Harga Satuan Jumlah Harga Tenaga Kerja

Jumlah harga -

B

Bahan bambu dia. 8 cm -10 cm

m'

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

P.01c

1 m3 Pasangan Batu Campuran 1 PC : 4 PP

1.05

Jumlah Harga Bahan

-

Jumlah Harga Peralatan

No A

B

Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Kode

Satuan OH OH OH OH

Bahan Batu Belah 15/20 Pasir Beton Semen

C

13 X D

m3 m3 kg

Peralatan Molen (sewa-hari

Koefisien 2.7000 0.9000 0.0900 0.2700

Harga Satuan

Jumlah harga

Jumlah Harga Tenaga Kerja

-

1.200 0.520 163

Jumlah Harga Bahan

-

0.167

Jumlah Harga Peralatan

-

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.21

D

1 m2 bekisting u/ permukaan beton biasa dgn multiflex 12 mm atau 18 mm (tanpa perancah) Satuan Koefisien Harga Satuan Uraian Kode Jumlah harga Tenaga Pekerja L.01 OH 0.200 Tukang kayu L.02 OH 0.600 Kepala Tukang L.03 OH 0.060 Mandor L.04 OH 0.020 Jumlah Harga Tenaga Kerja Bahan Multiflex 18 mm M.38.d 0.35 lbr Kaso 5/7 kelas III M.33.d 0.02 m3 Paku 5 & 7 cm M.65.b 0.25 kg myk bekisting M.129 0.20 L Jumlah Harga Bahan Peralatan Jumlah Harga Peralatan Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m 2 (D+E)

B.17

Pembesian 100 kg dengan besi polos atau ulir

No A

B

C

No A

Uraian Tenaga

Kode

13 X D

13 X D

Satuan

Koefisien

Harga Satuan

Jumlah harga

-

-

B

Pekerja Tukang besi Kepala Tukang Mandor

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Besi beton/ulir Kawat ikat

M.55.d M.60

kg kg

0.700 0.700 0.070 0.070

105 1.5

Jumlah Harga Tenaga Kerja

-

Jumlah Harga Bahan

-

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-100 kg (D+E)

B.07 b) molen No A

1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58

Jumlah Harga Peralatan

B

C

13 X D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

Peralatan Molen

E.28.b

sewa hari

Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor

Koefisien 1.323 0.189 0.019 0.132

Harga Satuan Jumlah Harga Tenaga Kerja

-

371 698 1047 215

Jumlah Harga Bahan

-

0.250

Jumlah Harga Peralatan

-

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.051 b) molen No A

1 m3 beton mutu, f'c = 14,5 Mpac(K175), slump (12 ± 2) cm, w/c = 0,66 Uraian Tenaga Pekerja Tukang batu

Jumlah harga

13 X D

Kode

Satuan

L.01 L.02

OH OH

Koefisien 1.323 0.189

Harga Satuan

Jumlah harga -

-

B

C

Kepala Tukang Mandor

L.03 L.04

OH OH

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

Peralatan Molen

E.28.b

sewa hari

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

1.6,23

1,0000 m1 memasang 1 m pipa galvanis Ø 2 "

No A

B

Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Kode

0.019 0.132

Jumlah Harga Tenaga Kerja

-

326 760 1029 215

Jumlah Harga Bahan

-

0.250

Jumlah Harga Peralatan

-

13 X D

Satuan OH OH OH OH

Bahan pipa galvanis perlengkapan 35 % harga pipa

Koefisien 0.1080 0.1800 0.0180 0.0054

Harga Hatuan Jumlah Harga Tenaga Kerja

1.2000 0.3500

m'

Jumlah harga -

-

-

Jumlah Harga Bahan C

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm No Uraian Kode Satuan Koefisien A

B

C

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

L.01 L.03 L.03 L.04

Bahan PC PP

Harga Satuan

Jumlah Harga

OH OH OH OH

0.3 0.15 0.015 0.015

Jumlah Harga Tenaga Kerja

-

Kg

5.184 0.026

Jumlah Harga Bahan

-

m3

Peralatan Jumlah Harga Peralatan

D E F 1.6,14 No A

Jumlah (A+B+C) Overhead & Profit ( 13 %) Harga Satuan Pekerjaan (D+E)

13% x D

1,0000 m2 pengecat tembok baru ( 1 lap. Plamir, 1 lap cat dasar 2 lap. Cat penutup Uraian Tenaga Pekerja Tukang Kepala Tukang

Kode

Satuan OH OH OH

Koefisien 0.0200 0.0630 0.0063

Harga Hatuan

Jumlah harga -

-

B

Mandor

OH

Bahan Plamir cat dasar cat penutup 2 kali

kg kg kg

C

Peralatan

D

Jumlah A+B+C

0.0025

0.1000 0.1000 0.2600

Jumlah Harga Tenaga Kerja

-

Jumlah Harga Bahan

-

Jumlah Harga Peralatan

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU No A. 1 2

Uraian TENAGA Pekerja Mandor

B. 1

BAHAN Bahan timbunan ( SIRTU )

C.

PERALATAN

Kode

Satuan

Koefisien

Harga Satuan (Rp)

Jumlah Harga (Rp)

OH OH

0.3000 0.0100

Jumlah Harga Tenaga Kerja

-

m3

1.2000

Jumlah Harga Bahan

-

Jumlah Harga Peralatan D. E. F. P.01e No A

B

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E ) Bongkar Pasangan 1 m3 Batu Uraian Tenaga Pekerja Mandor

Kode

Satuan OH OH

Koefisien

Harga Satuan

1.8500 0.1850

Jumlah harga

Jumlah Harga Tenaga Kerja

-

Bahan Jumlah Harga Bahan

C

Peralatan Palu Pahat/ Betel

0.050 0.150

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Jumlah Harga Peralatan

-

13 X D

B.39 bongkar 1 m3 beton secara konvensional No A

B

C

Kode

Satuan

L.01 L.04

OH OH

Bahan cuka bibit

M.118

L

Peralatan Palu/godam gergaji besi

E.30 -

bh Ls

Uraian Tenaga Pekerja Mandor

Koefisien

Harga Satuan

2.650 0.265

Jumlah harga

Jumlah Harga Tenaga Kerja

-

1.200

Jumlah Harga Bahan

-

0.1 0.2

-

-

pahat beton (baja keras)

E.29

bh

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m 2 (D+E)

0.5

Jumlah Harga Peralatan

13 X D

-

Jumlah Total

Rp

37,146.74

Rp

37,146.74

Rp

4,829.08

Rp

41,975.82

Jumlah Total

Rp

21,773.40

Rp

21,773.40

Rp

2,830.54

Rp

24,603.94

Jumlah Total

Rp

2,409.60

Rp

3,412.50

Rp Rp

5,822.10

Rp

756.87

Rp

6,578.97

Jumlah Total

Rp

247,896.00

Rp

719,254.00

Rp Rp

12,352.41 979,502.41

Rp

127,335.31

Rp

1,106,837.72

Jumlah Total

Rp

59,696.00

Rp

101,935.00

Rp Rp

161,631.00

Rp

21,012.03

Rp

182,643.03

Jumlah Total

Rp

100,436.00

Rp

1,150,200.00

Rp Rp

1,250,636.00

Rp

162,582.68

Rp

1,413,218.68

Jumlah Total

Rp

101,920.80

Rp

880,010.93

Rp Rp

18,491.63 1,000,423.36

Rp

130,055.04

Rp

1,130,478.39

Jumlah Total

Rp

101,920.80

Rp

828,160.64

Rp Rp

18,491.63 948,573.07

Rp

123,314.50

Rp

1,071,887.57

Jumlah Total

Rp

20,612.52

Rp

135,556.25

Rp

156,168.77

Jumlah Total

30,132.00

16,619.59

46,751.59 6,077.71 52,829.30

Jumlah Total

Rp

6,245.00

Rp

10,474.00

Rp

16,719.00

Jumlah Total (Rp)

18,078.00

199,920.00

217,998.00 28,339.74 246,337.74

Jumlah Total

Rp

122,063.00 -

Rp Rp

3,750.00 125,813.00

Rp

16,355.69

Rp

142,168.69

Jumlah Total

Rp

174,847.00

Rp

3,690.00

Rp Rp

6,250.00 184,787.00

Rp

24,022.31

Rp

208,809.31

Jumlah Total

-

-

Jumlah Total

-

-

Jumlah Total

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

Jumlah Total

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total (Rp)

-

-

-

Jumlah Total

-

-

Jumlah Total

-

-

-

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak TEMPAT PEKERJAAN 1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten No 1 I

II

II

: : Bandungrejo : Mranggen : Demak Uraian Pekerjaan

Harga Perkiraan Sendiri (HPS) untuk : PERBAIKAN JEMBATAN DESA BANDUNGREJO, MRANGGEN Kegiatan APBD Perubahan Kabupaten Demak Tahun 2015 Volume

Analis

3

4

Harga Satuan ( Rp. ) 5

Jumlah Harga ( Rp. ) 6

2 PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan 4 Pembongkaran beton 5 Pembongkaran Abutmen lama

1.00 Ls 1.00 Ls 1.00 Ls 1.74 m3 4.52 m3

Taksir Taksir Taksir B.39 P.01e

500,000.00 600,000.00 250,000.00 208,809.31 142,168.69

500,000.00 600,000.00 250,000.00 363,328.20 643,171.15

PEKERJAAN TANAH 1 Pekj. Galian Tanah 2 Pekj. Urugan kembali

6.40 m3 1.07 m3

T. 06b T. 14a

41,975.82 24,603.94

268,645.22 26,244.20

PEKERJAAN JEMBATAN 2,80 X 4,00 x 0,25 1 Pekj. Pancang Cerucuk Bambu 2 Pekj. Pas. Batu belah 1Pc : 4Ps (80%) 3 Bambu Perancah 4 Pekj. Begisting Kayu 5 Pekj. Penulangan Beton - Pembesian Ø 12 mm - Pembesian Ø 10 mm - Pembesian Ø 8 mm - Pembesian Ø 6 mm Pekj. Beton K.225 (Molen) 6 7 Pekj. Beton K.175 (molen) 8 Kawat Bendrat 9 Pekj. Pipa Galvanis Ø 2" x 6 m 10 Dop Tutup Pipa leuning 11 Pekj. Plesteran 1Pc : 5Ps tbl 15 mm 12 Pekj. Urugan Sirtu

29.60 14.44 22.50 8.80

m' m3 btg m2

P. 07b P. 01c B.21

6,578.97 1,106,837.72 13,000.00 182,643.03

194,737.60 15,980,965.73 292,500.00 1,607,258.66

283.75 70.09 171.00 11.32 3.94 8.68 7.09 9.60 8.00 3.60 5.27

kg kg kg kg m3 m3 Kg m' buah m2

B.17 B.17 B.17 B.17 B. 07b B.051b 1,6,23 A.4.4.2.5

14,132.19 14,132.19 14,132.19 14,132.19 1,130,478.39 1,071,887.57 17,800.00 156,168.77 35,000.00 52,829.30 246,337.74

4,009,977.76 990,541.93 2,416,651.99 160,004.62 4,449,562.95 9,308,271.64 126,145.87 1,499,220.19 280,000.00 190,185.48 1,297,608.68

Jumlah PPN 10 % Jumlah Total Dibulatkan Terbilang :

: : : :

(Lima Puluh Juta Rupiah)

Demak,

2015

KASI PERTAMANAN DAN PEMAKAM PADA BIDANG KEBERSIHAN DAN P DPU PPE KABUPATEN DEMAK SELAKU PEJABAT PEMBUAT KOMITMEN

ANDI ERWIN PRASETYO, ST NIP. 19720914 200312 1 002

KOP PERUSAHAAN BILL OF QUANTITY (BQ) TEMPAT PEKERJAAN 1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten No 1 I

II

II

: : Bandungrejo : Mranggen : Demak Uraian Pekerjaan

Harga Perkiraan Sendiri (HPS) untuk : PERBAIKAN JEMBATAN DESA BANDUNGREJO, MRANGGEN Kegiatan APBD Perubahan Kabupaten Demak Tahun 2015 Volume

Analis

3

4

Harga Satuan ( Rp. ) 5

Jumlah Harga ( Rp. ) 6

2 PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan 4 Pembongkaran beton 5 Pembongkaran Abutmen lama

1.00 Ls 1.00 Ls 1.00 Ls 1.74 m3 4.52 m3

Taksir Taksir Taksir B.39 P.01e

-

-

PEKERJAAN TANAH 1 Pekj. Galian Tanah 2 Pekj. Urugan kembali

6.40 m3 1.07 m3

T. 06b T. 14a

-

-

PEKERJAAN JEMBATAN 2,80 X 4,00 x 0,25

1 Pekj. Pancang Cerucuk Bambu 2 Pekj. Pas. Batu belah 1Pc : 4Ps (80%) 3 Bambu Perancah 4 Pekj. Begisting Kayu

29.60 14.44 22.50 8.80

m' m3 btg m2

P. 07b P. 01c B.21

-

-

283.75 70.09 171.00 11.32 3.94 8.68 7.09 9.60 8.00 3.60 5.27

kg kg kg kg m3 m3 Kg m' buah m2

B.17 B.17 B.17 B.17 B. 07b B.051b 1,6,23 A.4.4.2.5

-

-

5 Pekj. Penulangan Beton

- Pembesian Ø 12 mm - Pembesian Ø 10 mm - Pembesian Ø 8 mm - Pembesian Ø 6 mm 6 Pekj. Beton K.225 (Molen) 7 Pekj. Beton K.175 (molen) 8 Kawat Bendrat 9 Pekj. Pipa Galvanis Ø 2" x 6 m 10 Dop Tutup Pipa leuning 11 Pekj. Plesteran 1Pc : 5Ps tbl 15 mm 12 Pekj. Urugan Sirtu

Jumlah PPN 10 % Jumlah Total Dibulatkan Terbilang :

: : : :

( ..................................................................... )

Demak,

2015

dibuat oleh PT. / CV ……………………………

…………………………….. DIREKTUR

PERHITUNGAN VOLUME PEKERJAAN JEMBATAN BETON : PERBAIKAN JEMBATAN DESA BANDUNGREJO, MRANGGEN Uk. 2,80 m x 4,00 m x 0,25 m I PEKERJAAN TANAH No Pekerjaan P 1 Pekj. Galian Tanah 6.40 2 Pekj. Urugan kembali 6.40

DAN ENERGI k

MRANGGEN

Harga Total ( Rp. ) 7

II PEKERJAAN JEMBATAN 2,80 X 4,00 x 0,25 No Pekerjaan 1 Pekj. Pancang Cerucuk Bambu No

L 1.00

T 0.5

Hit =6,40/1+1

J1 7.40

Hit =1+1

P 6.40

T 1.80

6.4

0.4

L 0.85 Pas. Batu belah 2 0.3

Uraian Pekerjaan 6 Pekj. Pas. Batu belah 1Pc : 4Ps (80%) Balok Tumpu

2,356,499.35 Uraian Pekerjaan Total Volume pas Batu Belah 294,889.43

B PEKJ. BALOK TUMPU No Pekerjaan 1 BALOK TUMPU Beton K. 225 2 PEKJ. PENULANGAN Ø 10 mm a Tul. balok Tumpu Ø 10 mm

b Beugel Blk Tumpu Ø 8 mm

Kawat Bendrat

C PEKJ. BEGESTING No Pekerjaan 1 BEGESTING Kayu Tahun a Begesting Plat jembatan 42,803,633.11 45,455,021.89 4,545,502.19 50,000,524.08 50,000,000.00

2015

AN DAN PEMAKAMAN EBERSIHAN DAN PJU BUPATEN DEMAK

Volume Pa.s bt belah 19.58

P 6.4 Hit =0,05+1.44+0,5+4+0,5+1.44+0,05

P 1.26

Berat Besi balok tumpu 20.90

Per 10

hit.

T 0.3

L 0.4 P 7.10

Hit =0,05+0,24+0,34+0,24+0,34+0,05

Berat besi Tul.per 1 Ba Berat besi Tul. per 2 Ba Hit =4/0,2+1 Berat Besi begel Per 1 Ba Berat Besi begel Per 2 Ba Koef kawat 0.1500

P

L

=0,20+4+0,20

4.4

2.00

Begesting Plat lanta c bambu perancah

pj(Titik) 9

=4,00/0,5+1

D PEKJ. LANTAI JEMBATAN BETON No Pekerjaan 1 Beton Lantai jembatan Struktur k.225 2 PEKERJAAN PENULANGAN Tulangan melintang 1. Ø12 mm Tulangan melintang 2. Ø12 mm

P 2.40 Hit. =0.05+0.20+3.94+0.20+0.05 =0.05+3.94+0.05

Tulangan memanjang 1. Ø12 mm Tulangan memanjang 2. Ø12 mm

=0.05+0.20+2.35+0.20+0.05 =0.05+2.35+0.05

Kawat Bendrat

Berat Besi lantai jembatan 283.75

MBUAT KOMITMEN

PRASETYO, ST 14 200312 1 002

Vol. Balok Tumpu Dan Bal Vol blk Tumpu dan Gelagar 1.54

F PEKJ. TIANG LEUNNING Uraian Pekerjaan No 1 TIANG LEUNNING Beton Struktur K. 175

P 1.00

=2/0,5+1

T L 4.00 0.25 P Hit. 4.44 =2,40/0.15+1 4.04 =2,40/0.15+1 Berat besi lantai tu

3.85 =4,00/0,15+1 2.45 =4,00/0,15+1 Berat besi lantai tul m Jumlah berat besi lanta Per Koef kawat 10 0.1500

L 0.14

T 0.10

No PEKJ. PENULANGAN Ø 8 mm 2

Tul Tiang Leunning Ø 8 mm

Beugel Tiang Leunning Ø 6 mm

Kawat Bendrat No

Uraian Pekerjaan Plesteran + acian

G PEKJ. BALOK SANDUNG No Pekerjaan 1 BALOK SANDUNG Beton Struktur K. 175 2 PENULANGAN Ø 8 mm Tul B. Sandung Ø 8 mm

hit =(0,05+0,13)x2)+0,18+0,85+0,12,56+ 0,90+0,31

hit =0,05+0,12+0,08+0,12+0,08+0,05

Berat Besi tiang leunning 147.05 P 1.00

p 15.16

hit

total Berat Besi Tu p hit 0.5 =1,00/0,2 Berat Besi begel. Per 1 Tia

Per 10 L 0.6

P 4

T 0.25

hit =0,05+3,94+0,05

P 4.04

Berat Besi begel. Per 6 Tia Total berat be Koef kawat 0.1500

L 0.3 Volume B. sandung per 2

Berat besi Tul. Per 1 Balo Berat besi Tul. Per 2 Balo Beugel B. Sandung Ø 6 mm

Kawat Bendrat

No

Berat Besi balok sandung 20.76 Pekerjaan

Beton opritan No

Pekerjaan Urugan Sirtu

hit =0,05+0,24+0,21+0,24+0,21+0,05

P

1.00 =4,00/0,2+1 Berat Besi begel Per 1 balo Berat Besi begel Per 2 Balo Total berat besi balo Per Koef kawat 10 0.1500

P 10

T 4

L

P 6.5

T 4

L

0.20

0.20

PERHITUNGAN VOLUME PEKERJAAN JEMBATAN BETON : PERBAIKAN JEMBATAN DESA BANDUNGREJO, MRANGGEN Uk. 2,80 m x 4,00 m x 0,25 m I PEKERJAAN TANAH No Pekerjaan P 1 Pekj. Galian Tanah 6.40 2 Pekj. Urugan kembali 6.40

MRANGGEN

II PEKERJAAN JEMBATAN 2,80 X 4,00 x 0,25 No Pekerjaan 1 Pekj. Pancang Cerucuk Bambu

Harga Total ( Rp. ) 7

No

Uraian Pekerjaan 6 Pekj. Pas. Batu belah 1Pc : 4Ps (80%) Balok Tumpu

L 1.00

T 0.5

Hit =6,40/1+1

J1 7.40

Hit =1+1

P 6.40

T 1.80

6.4

0.4

L 0.85 Pas. Batu belah 2 0.3

Uraian Pekerjaan Total Volume pas Batu Belah -

B PEKJ. BALOK TUMPU No Pekerjaan 1 BALOK TUMPU Beton K. 225

Volume Pa.s bt belah 19.58

P 6.4

Vol. Balok Tumpu Dan Bal Vol blk Tumpu dan Gelagar 1.54

L 0.4

T 0.3

2 PEKJ. PENULANGAN Ø 10 mm a Tul. balok Tumpu Ø 10 mm

b Beugel Blk Tumpu Ø 8 mm

Kawat Bendrat

C PEKJ. BEGESTING No Pekerjaan 1 BEGESTING Kayu Tahun a Begesting Plat jembatan -

2015

Hit =0,05+1.44+0,5+4+0,5+1.44+0,05

P 7.10

Hit =0,05+0,24+0,34+0,24+0,34+0,05

P 1.26

Berat Besi balok tumpu 20.90

Per 10

hit.

Berat besi Tul.per 1 Ba Berat besi Tul. per 2 Ba Hit =4/0,2+1 Berat Besi begel Per 1 Ba Berat Besi begel Per 2 Ba Koef kawat 0.1500

P

L

=0,20+4+0,20

4.4

2.00

Begesting Plat lanta c bambu perancah

pj(Titik) 9

=4,00/0,5+1

D PEKJ. LANTAI JEMBATAN BETON No Pekerjaan 1 Beton Lantai jembatan Struktur k.225 2 PEKERJAAN PENULANGAN Tulangan melintang 1. Ø12 mm Tulangan melintang 2. Ø12 mm

P 2.40 Hit. =0.05+0.20+3.94+0.20+0.05 =0.05+3.94+0.05

Tulangan memanjang 1. Ø12 mm Tulangan memanjang 2. Ø12 mm

=0.05+0.20+2.35+0.20+0.05 =0.05+2.35+0.05

Kawat Bendrat

Berat Besi lantai jembatan 283.75

=2/0,5+1

T L 4.00 0.25 P Hit. 4.44 =2,40/0.15+1 4.04 =2,40/0.15+1 Berat besi lantai tu

………………………..

………………..

F PEKJ. TIANG LEUNNING Uraian Pekerjaan No 1 TIANG LEUNNING Beton Struktur K. 175 No PEKJ. PENULANGAN Ø 8 mm 2

Tul Tiang Leunning Ø 8 mm

Beugel Tiang Leunning Ø 6 mm

Kawat Bendrat No

Uraian Pekerjaan Plesteran + acian

G PEKJ. BALOK SANDUNG No Pekerjaan 1 BALOK SANDUNG Beton Struktur K. 175 2 PENULANGAN Ø 8 mm

P 1.00 hit =(0,05+0,13)x2)+0,18+0,85+0,12,56+ 0,90+0,31

hit =0,05+0,12+0,08+0,12+0,08+0,05

Berat Besi tiang leunning 147.05 P 1.00

3.85 =4,00/0,15+1 2.45 =4,00/0,15+1 Berat besi lantai tul m Jumlah berat besi lanta Per Koef kawat 10 0.1500

L 0.14 p 15.16

T 0.10 hit

total Berat Besi Tu p hit 0.5 =1,00/0,2 Berat Besi begel. Per 1 Tia

Per 10 L 0.6

P 4

T 0.25

hit

P

Berat Besi begel. Per 6 Tia Total berat be Koef kawat 0.1500

L 0.3 Volume B. sandung per 2

Tul B. Sandung Ø 8 mm

=0,05+3,94+0,05

4.04

Berat besi Tul. Per 1 Balo Berat besi Tul. Per 2 Balo Beugel B. Sandung Ø 6 mm

Kawat Bendrat

No

Berat Besi balok sandung 20.76 Pekerjaan

Beton opritan No

Pekerjaan Urugan Sirtu

hit =0,05+0,24+0,21+0,24+0,21+0,05

P

1.00 =4,00/0,2+1 Berat Besi begel Per 1 balo Berat Besi begel Per 2 Balo Total berat besi balo Per Koef kawat 10 0.1500

P 10

T 4

L

P 6.5

T 4

L

0.20

0.20

q 2 3

J2 2

n 0.50

q 2

Volume Sat. 6.40 m3 1.07 m3

Ket. V= p*l*t*q V= p*n*/q

Volume Sat. 29.60 m'

Ket. V= j1*j2*q

q

Volume Sat. 9.79 m3 Pas. Batu belah 2 Abutment 19.58 m3 2 1.54 m3

ol. Balok Tumpu Dan Balok Gelagar % 80%

n

V= p*t*l*2

1.54 m3 14.44 m3

q n Volume Sat. 2 1.54 m3 jlh Koef Volume Sat. 8 0.617 35.05 Kg Berat besi Tul.per 1 Balok Tumpu 35.05 Kg Berat besi Tul. per 2 Balok Tumpu 70.09 kg jlh Koef Volume Sat. 21.00 0.395 10.45 Kg Berat Besi begel Per 1 Balok Tumpu 10.45 kg Berat Besi begel Per 2 Balok Tumpu 20.90 kg Volume Sat. 0.31 Kg

q

Ket. V= p*t*l

Volume

Sat.

8.8 m2

Ket. V= p*l*t*q Ket. V= p*j*K

Ket. V= p*j*K

Ket.

Ket. V=l*p 5.44

Begesting Plat lantai Jembatan 8.8 m2 L (Titik) Volume 5 2 22.5 btg

q

n

Volume Sat. 2.40 m3 jlh Koef Volume Sat. 17.00 0.891 67.25 kg 17.00 0.891 61.19 kg Berat besi lantai tul melintang 128.45 28 0.891 28 0.891 Berat besi lantai tul memanjang Jumlah berat besi lantai jembatan

q 6

n

V= p*l

Ket. V= p*l*t Ket. V= p*j*k V=p*j*k

94.91 kg 60.39 kg 155.30 kg 283.75 kg Volume Sat. 4.26 Kg

V=p*j*k V=p*j*k

Volume Sat. 0.08 m3

Ket. V= p*l*t*q

Ket.

5.04 3.11 6.26 6.08 6.40 6.46 3.28 6.12 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

0.64 1.91 5.01 3.9 3.34 3.54 2.94 2.14 1.34 4.94

1.5 1.5 5

jlh

Koef 2

0.395

Volume

Sat.

11.98 kg

total Berat Besi Tul Leunning 143.72 kg jlh Koef Volume Sat. 5 0.222 0.56 kg erat Besi begel. Per 1 Tiang leuning 0.56 kg

erat Besi begel. Per 6 Tiang Leuning Total berat besi leunning

jlh 6

q

n

Volume B. sandung per 2 Abutment jlh Koef 4 0.395 Berat besi Tul. Per 1 Balok Sandung Berat besi Tul. Per 2 Balok Sandung jlh Koef 18.00 0.222 erat Besi begel Per 1 balok sandung erat Besi begel Per 2 Balok sandung Total berat besi balok sandung

3.33 kg 147.05 kg Volume Sat. 2.21 Kg Volume Sat. 3.60 m2

Ket. V=p*j*k Ket. V=p*j*k

Ket. Ket. v=p*l*j

Volume Sat. 0.30 m3 0.60 m3 Volume Sat. 6.38 kg 6.38 kg 12.77 kg Volume Sat. 4.00 kg 4.00 kg 7.99 kg 20.76 kg Volume Sat. 0.31 Kg

Ket. V=p*t*l Ket. V=p*j*k

Ket. V=p*j*k

Ket.

q

n

Volume Sat. 8.00 m3

Ket. V = P*L*T

q

n

Volume Sat. 5.27 m3

Ket. V = P*L*T

4 5.5 6

q 2 3

J2 2

n

Volume Sat. 6.40 m3 1.07 m3

Ket. V= p*l*t*q V= p*n*/q

Volume Sat. 2 29.60 m'

Ket. V= j1*j2*q

0.50

q

q

Volume Sat. 9.79 m3 Pas. Batu belah 2 Abutment 19.58 m3 2 1.54 m3

ol. Balok Tumpu Dan Balok Gelagar % 80%

q 2

n

Ket. V= p*t*l V= p*t*l*2

1.54 m3 14.44 m3

Volume Sat. 1.54 m3

Ket. V= p*l*t*q

jlh Koef Volume Sat. 8 0.617 35.05 Kg Berat besi Tul.per 1 Balok Tumpu 35.05 Kg Berat besi Tul. per 2 Balok Tumpu 70.09 kg jlh Koef Volume Sat. 21.00 0.395 10.45 Kg Berat Besi begel Per 1 Balok Tumpu 10.45 kg Berat Besi begel Per 2 Balok Tumpu 20.90 kg Volume Sat. 0.31 Kg

q

n

Volume

Sat.

8.8 m2

Ket. V= p*j*K

Ket. V= p*j*K

Ket.

Ket. V=l*p 5.44

Begesting Plat lantai Jembatan 8.8 m2 L (Titik) Volume 5 2 22.5 btg

q

n

Volume Sat. 2.40 m3 jlh Koef Volume Sat. 17.00 0.891 67.25 kg 17.00 0.891 61.19 kg Berat besi lantai tul melintang 128.45 28 0.891 28 0.891 Berat besi lantai tul memanjang Jumlah berat besi lantai jembatan

q 6 jlh

n Koef 2

0.395

jlh 6

q

n

Ket. V= p*l*t Ket. V= p*j*k V=p*j*k

94.91 kg 60.39 kg 155.30 kg 283.75 kg Volume Sat. 4.26 Kg

V=p*j*k V=p*j*k

Volume Sat. 0.08 m3 Volume Sat.

Ket. V= p*l*t*q Ket.

11.98 kg

total Berat Besi Tul Leunning 143.72 kg jlh Koef Volume Sat. 5 0.222 0.56 kg erat Besi begel. Per 1 Tiang leuning 0.56 kg

erat Besi begel. Per 6 Tiang Leuning Total berat besi leunning

V= p*l

3.33 kg 147.05 kg Volume Sat. 2.21 Kg Volume Sat. 3.60 m2

Volume Sat. 0.30 m3 Volume B. sandung per 2 Abutment 0.60 m3 jlh Koef Volume Sat.

5.04 3.11 6.26 6.08 6.40 6.46 3.28 6.12 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Ket.

V=p*j*k Ket. V=p*j*k

Ket. Ket. v=p*l*j

Ket. V=p*t*l Ket.

4 5.5 6

0.64 1.91 5.01 3.9 3.34 3.54 2.94 2.14 1.34 4.94

1.5 1.5 5

4 0.395 6.38 kg Berat besi Tul. Per 1 Balok Sandung 6.38 kg Berat besi Tul. Per 2 Balok Sandung 12.77 kg jlh Koef Volume Sat. 18.00 0.222 4.00 kg erat Besi begel Per 1 balok sandung 4.00 kg erat Besi begel Per 2 Balok sandung 7.99 kg Total berat besi balok sandung 20.76 kg Volume Sat. 0.31 Kg

V=p*j*k

Ket. V=p*j*k

Ket.

q

n

Volume Sat. 8.00 m3

Ket. V = P*L*T

q

n

Volume Sat. 5.27 m3

Ket. V = P*L*T

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO 1 1 2 3

4 5 6 7 8 9 10 11 12 13 14

URAIAN 2

1 m3 galian tanah biasa sedalam < 1 m 1 m3 Urugan tanah kembali (1m3 ) 1m Panjang cerucuk bambu diameter 8 cm - 10 cm 1m3 Pas. Batu Campuran 1Pc : 4 Ps 1m2 begesting u/ permukaan beton biasa dgn multiflex 12 mm atau 18 mm (tanpa Perancah) Pembesian 100 kg dengan besi polos atau ulir 1 m3 Beton mutu, Fc = 19,3 Mpa (K 225), Slump (12± 2) cm, w/c + 0,58 b) molen 1 m3 Beton mutu, Fc = 14,5 Mpac (K 175), Slump (12± 2) cm, w/c + 0,66 b) molen 1,0000 m1 memqsqng 1 m' Pipa Galvanis Ø 2" Pemasangan 1m2 Plesteran 1Pc : 5Ps tebal 15 mm 1,0000 m2 pengecata tembpk baru(1 lap, 1 Lap Cat dasar 2 lap. Cat Penutup ) Pekerjaan Pengurugan 1 m3 dengan SIRTU Bongkar pas 1m3 batu Bongkar 1m3 beton secara Konvensional

SATUAN 3

KODE 4

Harga Satuan 5

m3 m3 m1 m3 m2

T. 06a T. 14a P.07b P.01c B. 21

Rp

41,975.82

Rp

24,603.94

Rp

6,578.97

Rp Rp

1,106,837.72 182,643.03

kg m3

B. 17 B. 07b

Rp Rp

1,413,218.68 1,130,478.39

m3

B. 051b

Rp

1,071,887.57

m' m2 m2

1.6.23 A. 4.4.2.5 1.6,14

Rp Rp Rp

156,168.77 52,829.30 16,719.00

m3 m3 m3

Dihit P.01e B. 39

Rp Rp Rp

246,338 142,169 208,809

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO 1 1 2 3

4 5 6 7 8 9 10 11 12 13 14

URAIAN 2

1 m3 galian tanah biasa sedalam < 1 m 1 m3 Urugan tanah kembali (1m3 ) 1m Panjang cerucuk bambu diameter 8 cm - 10 cm 1m3 Pas. Batu Campuran 1Pc : 4 Ps 1m2 begesting u/ permukaan beton biasa dgn multiflex 12 mm atau 18 mm (tanpa Perancah) Pembesian 100 kg dengan besi polos atau ulir 1 m3 Beton mutu, Fc = 19,3 Mpa (K 225), Slump (12± 2) cm, w/c + 0,58 b) molen 1 m3 Beton mutu, Fc = 14,5 Mpac (K 175), Slump (12± 2) cm, w/c + 0,66 b) molen 1,0000 m1 memqsqng 1 m' Pipa Galvanis Ø 2" Pemasangan 1m2 Plesteran 1Pc : 5Ps tebal 15 mm 1,0000 m2 pengecata tembpk baru(1 lap, 1 Lap Cat dasar 2 lap. Cat Penutup ) Pekerjaan Pengurugan 1 m3 dengan SIRTU Bongkar pas 1m3 batu Bongkar 1m3 beton secara Konvensional

SATUAN 3

KODE 4

Harga Satuan 5

m3 m3 m1 m3 m2

T. 06a T. 14a P.07b P.01c B. 21

kg m3

B. 17 B. 07b

-

m3

B. 051b

-

m' m2 m2

1.6.23 A. 4.4.2.5 1.6,14

-

m3 m3 m3

Dihit P.01e B. 39

-

-

-

-

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO 1 1 2 3 4 5 6 7 8 9

URAIAN 2

SATUAN 3

KODE 4

m3 m3 m3 m3 m1 m3 m2

P.01e B. 39 T. 06a T. 14a P.07b P.01c B. 21

Rp Rp Rp

142,169 208,809 50,326.25

Rp Rp

24,603.94 6,578.97

Rp Rp

1,106,837.72 182,643.03

kg m3

B. 17 B. 07b

Rp Rp

1,413,218.68 1,130,478.39

1 m3 Beton mutu, Fc = 14,5 Mpac (K 175), Slump (12± 2) cm, w/c + 0,66 b) molen 1,0000 m1 memasang 1 m' Pipa Galvanis Ø 2 1/2" Pemasangan 1m2 Plesteran 1Pc : 5Ps tebal 15 mm 1,0000 m2 pengecatan tembok baru(1 lap, 1 Lap Cat dasar 2 lap. Cat Penutup )

m3

B. 051b

Rp

1,071,887.57

m' m2 m2

1.6.23 A. 4.4.2.5 1.6,14

Rp Rp Rp

193,639.60 52,829.30 16,719.00

Pekerjaan Pengurugan 1 m3 dengan SIRTU Persiapan Pemanfaatan kembali bongkaran bt belah

m3 m3 m3 m3 m3 m3 m3

Dihit P. 01f B. 03b P.01d A. 3.2.1.4 T. 14c

Rp Rp Rp Rp Rp Rp Rp

246,338 15,758.98 1,007,051.85 991,166.40 938,545.12 188,474.96 486,405.34

KAPASITAS

SATUAN

Bongkar pas 1m3 batu Bongkar 1m3 beton secara Konvensional 1 m3 galian tanah biasa sedalam < 1 m 1 m3 Urugan tanah kembali (1m3 ) 1m Panjang cerucuk bambu diameter 8 cm - 10 cm 1m3 Pas. Batu Campuran 1Pc : 4 Ps 1m2 begesting u/ permukaan beton biasa dgn multiflex 12 mm atau 18 mm (tanpa Perancah) Pembesian 100 kg dengan besi polos atau ulir

Harga Satuan 5

1 m3 Beton mutu, Fc = 19,3 Mpa (K 225), Slump (12± 2) cm, w/c + 0,58 b) molen 10 11 12 13 14 15 16 17 18 19 20

1 m3 beton mutu, f'c = 9,8 Mpac(K125), slump (12 ± 2) cm, w/c = 0,78 1m3 Pas. Batu Campuran 1Pc : 5 Ps 1m3 Pas. Batu Campuran 1Pc : 6 Ps 1 m3 Timbunan pasir sebagai bahan pengisi (1 m3) 1 m3 batu kosong (anstamping)

A.3.2.1.9

DAFTAR SEWA PERALATAN

NO

NAMA ALAT

KODE

HP

SEWA ALAT (Rp)

NO

1 2

NAMA ALAT

KODE

Concrete Mixer (350) Dump Truck 3.5 Ton

HP

KAPASITAS

SATUAN

20 100

350 3.5

Liter Ton

SEWA ALAT (Rp)

73,966.51 338,467.63

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO 1 1 2 3 4 5 6 7 8 9

URAIAN 2

SATUAN 3

KODE 4

m3 m3 m3 m3 m1 m3 m2

P.01e B. 39 T. 06a T. 14a P.07b P.01c B. 21

-

kg m3

B. 17 B. 07b

-

1 m3 Beton mutu, Fc = 14,5 Mpac (K 175), Slump (12± 2) cm, w/c + 0,66 b) molen 1,0000 m1 memasang 1 m' Pipa Galvanis Ø 2 1/2" Pemasangan 1m2 Plesteran 1Pc : 5Ps tebal 15 mm 1,0000 m2 pengecatan tembok baru(1 lap, 1 Lap Cat dasar 2 lap. Cat Penutup )

m3

B. 051b

-

m' m2 m2

1.6.23 A. 4.4.2.5 1.6,14

-

Pekerjaan Pengurugan 1 m3 dengan SIRTU Persiapan Pemanfaatan kembali bongkaran bt belah

m3 m3 m3 m3 m3 m3

Dihit P. 01f B. 03b P.01d A. 3.2.1.4 T. 14c

-

Bongkar pas 1m3 batu Bongkar 1m3 beton secara Konvensional 1 m3 galian tanah biasa sedalam < 1 m 1 m3 Urugan tanah kembali (1m3 ) 1m Panjang cerucuk bambu diameter 8 cm - 10 cm 1m3 Pas. Batu Campuran 1Pc : 4 Ps 1m2 begesting u/ permukaan beton biasa dgn multiflex 12 mm atau 18 mm (tanpa Perancah) Pembesian 100 kg dengan besi polos atau ulir

Harga Satuan 5

-

1 m3 Beton mutu, Fc = 19,3 Mpa (K 225), Slump (12± 2) cm, w/c + 0,58 b) molen 10 11 12 13 14 15 16 17 18 19

1 m3 beton mutu, f'c = 9,8 Mpac(K125), slump (12 ± 2) cm, w/c = 0,78 1m3 Pas. Batu Campuran 1Pc : 5 Ps 1m3 Pas. Batu Campuran 1Pc : 6 Ps 1 m3 Timbunan pasir sebagai bahan pengisi (1 m3)

20

m3

A.3.2.1.9

HP

KAPASITAS

SATUAN

20 100

350 3.5

Liter Ton

1 m3 batu kosong (anstamping)

-

DAFTAR SEWA PERALATAN

NO

1 2

NAMA ALAT

KODE

Concrete Mixer (350) Dump Truck 3.5 Ton

SEWA ALAT (Rp)

-

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO 1 1 2 3 4 5 6 7

URAIAN 2 1 m3 galian tanah biasa sedalam < 2 m 1 m3 Urugan tanah kembali (1m3 ) 1m Panjang cerucuk bambu diameter 8 cm - 10 cm 1m3 Pas. Batu Campuran 1Pc : 4 Ps 1m2 begesting u/ permukaan beton biasa dgn multiflex 12 mm atau 18 mm (tanpa Perancah) Pembesian 100 kg dengan besi polos atau ulir

SATUAN 3

KODE 4

Harga Satuan 5

m3 m3 m1 m3 m2

T. 06b T. 14a P.07b P.01c B. 21

Rp

50,326.25

Rp Rp

24,603.94 6,578.97

Rp Rp

1,106,837.72 182,643.03

kg m3

B. 17 B. 07b

Rp Rp

1,413,218.68 1,130,478.39

m3

B. 051b

Rp

1,071,887.57

m' m2 m2

1.6.23 A. 4.4.2.5 1.6,14

Rp Rp Rp

193,639.60 52,829.30 16,719.00

1 m3 Beton mutu, Fc = 19,3 Mpa (K 225), Slump (12± 2) cm, w/c + 0,58 b) molen 8 9 10 11

1 m3 Beton mutu, Fc = 14,5 Mpac (K 175), Slump (12± 2) cm, w/c + 0,66 b) molen 1,0000 m1 memasang 1 m' Pipa Galvanis Ø 21/2" Pemasangan 1m2 Plesteran 1Pc : 5Ps tebal 15 mm 1,0000 m2 pengecatan tembok baru(1 lap, 1 Lap Cat dasar 2 lap. Cat Penutup )

1,0000 m2 pengecatan tembok baru(1 lap, 1 Lap Cat dasar 2 lap. Cat Penutup ) 12 13 14 15

1 m3 beton mutu, f'c = 9,8 Mpac(K125), slump (12 ± 2) cm, w/c = 0,78

B. 03b A. 3.2.1.4 T. 14c

1 m3 batu kosong (anstamping)

m3 m3 m3 m3

16

Pekerjaan Pengurugan 1 m3 dengan PADAS

m3

Dihit

HP

KAPASITAS

SATUAN

20 100

350 3.5

Liter Ton

1m3 Pas. Batu Campuran 1Pc : 6 Ps 1 m3 Timbunan pasir sebagai bahan pengisi (1 m3)

A.3.2.1.9

Rp Rp Rp Rp

1,007,051.85 937,775.19 188,474.96 486,405.34

Rp

176,368

DAFTAR SEWA PERALATAN

NO

1 2

NAMA ALAT

KODE

Concrete Mixer (350) Dump Truck 3.5 Ton

SEWA ALAT (Rp)

73,966.51 338,467.63

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO 1 1 2 3 4 5

URAIAN 2 1 m3 galian tanah biasa sedalam < 2 m 1 m3 Urugan tanah kembali (1m3 ) 1m Panjang cerucuk bambu diameter 8 cm - 10 cm 1m3 Pas. Batu Campuran 1Pc : 4 Ps 1m2 begesting u/ permukaan beton biasa dgn multiflex 12 mm atau 18 mm (tanpa Perancah)

SATUAN 3

KODE 4

m3 m3 m1 m3 m2

T. 06b T. 14a P.07b P.01c B. 21

Harga Satuan 5 -

6 7

Pembesian 100 kg dengan besi polos atau ulir

kg m3

B. 17 B. 07b

-

1 m3 Beton mutu, Fc = 14,5 Mpac (K 175), Slump (12± 2) cm, w/c + 0,66 b) molen 1,0000 m1 memasang 1 m' Pipa Galvanis Ø 2" Pemasangan 1m2 Plesteran 1Pc : 5Ps tebal 15 mm 1,0000 m2 pengecatan tembok baru(1 lap, 1 Lap Cat dasar 2 lap. Cat Penutup )

m3

B. 051b

-

m' m2 m2

1.6.23 A. 4.4.2.5 1.6,14

-

12 13 14 15

1 m3 beton mutu, f'c = 9,8 Mpac(K125), slump (12 ± 2) cm, w/c = 0,78

B. 03b A. 3.2.1.4 T. 14c

1 m3 batu kosong (anstamping)

m3 m3 m3 m3

-

16

Pekerjaan Pengurugan 1 m3 dengan PADAS

m3

Dihit

HP

KAPASITAS

SATUAN

20 100

350 3.5

Liter Ton

1 m3 Beton mutu, Fc = 19,3 Mpa (K 225), Slump (12± 2) cm, w/c + 0,58 b) molen 8 9 10 11

1m3 Pas. Batu Campuran 1Pc : 6 Ps 1 m3 Timbunan pasir sebagai bahan pengisi (1 m3)

A.3.2.1.9

DAFTAR SEWA PERALATAN

NO

1 2

NAMA ALAT

Concrete Mixer (350) Dump Truck 3.5 Ton

KODE

SEWA ALAT (Rp)

-

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak TEMPAT PEKERJAAN

1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten

: : Kebonbatur : Mranggen : Demak

Harga Perkiraan Sendiri (HPS) Untuk : Pembangunan Jalan Menuju Makam Desa Kebonbatur Kec. M

Kegiatan APBD Perubahan Kabupaten Demak Tahun Anggar

No

Uraian Pekerjaan

Volume

Analis

1

2

3

4

I

II

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan

1.00 Ls 1.00 Ls 1.00 Ls

PEK. KONSTRUKSI JALAN BETON BERTULANG Volume Jalan Beton = 110,00 m x 3,00 m x 0,15 m 1 Pek Urugan Padas 12.36 m3 2 Pek. Leveling Sirtu 16.50 m3 3 Pek. Begesting Kayu 33.00 m2 4 Pek. Lapis Plastik Kedap Air 363.00 m2 5 Pek. Penulangan beton Ø 10 mm 1,405.83 Kg 6 Pek. Beton Struktur K.225 (molen) 49.50 m3 7 Penggunaan Vibrator 49.50 m3

Terbilang :

Taksir Taksir Taksir

Dihit Dihit 1/2 B.21 Taksir B. 17 B.07b B. 15

Harga Satuan ( Rp. ) 5

Jumlah Harga ( Rp. ) 6

550,000.00 650,000.00 250,000.00

550,000.00 650,000.00 250,000.00

176,368.14 246,337.74 136,521.52 5,200.00 14,132.19 1,130,478.39 20,143.24 Jumlah PPN 10 % Jumlah Total Dibulatkan

2,179,381.11 4,064,572.71 4,505,210.00 1,887,600.00 19,867,463.47 55,958,680.37 997,090.55 : : : :

(Seratus Juta Rupiah)

Demak,

2015

KASI PERTAMANAN DAN PEMAKAMAN PADA BIDANG KEBERSIHAN DAN PJU DPU PPE KABUPATEN DEMAK SELAKU PEJABAT PEMBUAT KOMITMEN

ANDI ERWIN PRASETYO, ST NIP. 19720914 200312 1 002

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak TEMPAT PEKERJAAN

1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten

: : Bandungrejo : Mranggen : Demak

Harga Perkiraan Sendiri (HPS) Untuk : Betonisasi Jalan RT 06 RW II Desa Bandungrejo Kec. Mrangg

Kegiatan APBD Perubahan Kabupaten Demak Tahun Anggar

No

Uraian Pekerjaan

Volume

Analis

1

2

3

4

I

II

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan

1.00 Ls 1.00 Ls 1.00 Ls

PEK. KONSTRUKSI JALAN BETON BERTULANG Volume Jalan Beton A = 34,30 m x 4,25 m x 0,15 m Volume Jalan Beton B = 76 m x 4,50 m x 0,15 m Volume Jalan Beton C = 19 m x 3,50 m x 0,15 m Volume Jalan Beton D = 43 m x 4,00 m x 0,15 m 1 Pek. Leveling Sirtu 34.74 m3 2 Pek. Begesting Kayu 51.69 m2 3 Pek. Lapis Plastik Kedap Air 777.97 m2 Pek. Penulangan Beton Ø 10 mm 4 2,362.33 Kg 5 Pek. Beton Struktur K.225 (molen) 110.55 m3 6 Penggunaan Vibrator 108.94 m3

Terbilang :

Taksir Taksir Taksir

Dihit 1/2 B.21 Taksir B. 17 B.07b B. 15

Harga Satuan ( Rp. ) 5

Jumlah Harga ( Rp. ) 6

600,000.00 700,000.00 300,000.00

600,000.00 700,000.00 300,000.00

246,337.74 136,521.52 5,200.00 14,132.19 1,130,478.39 20,143.24 Jumlah PPN 10 % Jumlah Total Dibulatkan

8,557,970.16 7,056,797.11 4,045,418.00 33,384,956.11 124,978,625.46 2,194,430.11 : : : :

(Dua Ratus Juta Rupiah)

Demak,

2015

KASI PERTAMANAN DAN PEMAKAMAN PADA BIDANG KEBERSIHAN DAN PJU

DPU PPE KABUPATEN DEMAK SELAKU PEJABAT PEMBUAT KOMITMEN

ANDI ERWIN PRASETYO, ST NIP. 19720914 200312 1 002

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak TEMPAT PEKERJAAN

1. Kelurahan/Desa 2. Kecamatan

: : Wringinjajar : Mranggen

Harga Perkiraan Sendiri (HPS) Untuk : Betonisasi Jalan RT. 02 RW. 02 Wringinjajar Kec. Mranggen

3. Kabupaten

: Demak

Kegiatan APBD Perubahan Kabupaten Demak Tahun Anggar

No

Uraian Pekerjaan

Volume

Analis

1

2

3

4

I

II

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan PEK. KONSTRUKSI JALAN BETON Volume Jalan Beton = 109 m x 2,50 m x 0,15 m 1 Pek. Leveling Sirtu 2 Pek. Begesting Kayu 3 Pek. Lapis Plastik Kedap Air 4 Pek. Penulangan Beton Ø 8 mm 5 Pek. Beton Struktur K.225 (molen) 6 Penggunaan Vibrator

Terbilang :

1.00 Ls 1.00 Ls 1.00 Ls

13.72 32.70 305.20 726.68 40.88 40.88

m3 m2 m2 Kg m3 m3

Taksir Taksir Taksir

Dihit 1/2 B.21 Taksir B. 17 B.07b B. 15

Harga Satuan ( Rp. ) 5

Jumlah Harga ( Rp. ) 6

550,000.00 650,000.00 250,000.00

550,000.00 650,000.00 250,000.00

246,337.74 136,521.52 5,200.00 14,132.19 1,130,478.39 20,143.24 Jumlah PPN 10 % Jumlah Total Dibulatkan

3,379,846.17 4,464,253.54 1,587,040.00 10,269,556.28 46,208,304.25 823,355.07 : : : :

(Tujuh Puluh Lima Juta Rupiah)

Demak,

2015

KASI PERTAMANAN DAN PEMAKAM PADA BIDANG KEBERSIHAN DAN P DPU PPE KABUPATEN DEMAK SELAKU PEJABAT PEMBUAT KOMITMEN

ANDI ERWIN PRASETYO, ST NIP. 19720914 200312 1 002

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak TEMPAT PEKERJAAN 1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten

: : Wringinjajar : Mranggen : Demak

Harga Perkiraan Sendiri (HPS) Untuk : Betonisasi Jalan RW 32 Desa Batursari Kec. Mranggen

Kegiatan APBD Perubahan Kabupaten Demak Tahun Anggar

No

Uraian Pekerjaan

Volume

Analis

1

2

3

4

I

II

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan PEK. KONSTRUKSI JALAN BETON Volume Jalan Beton A = 43 m x 3,00 m x 0,15 m Volume Jalan Beton B = 80 m x 2,50 m x 0,15 m 1 Pek. Leveling Sirtu 2 Pek. Begesting Kayu 3 Pek. Lapis Plastik Kedap Air 4 Pek. Beton Struktur K.225 (molen)

Terbilang :

1.00 Ls 1.00 Ls 1.00 Ls

16.45 36.90 365.90 49.35

m3 m2 m2 m3

Taksir Taksir Taksir

Dihit 1/2 B.21 Taksir B.07b

Harga Satuan ( Rp. ) 5

Jumlah Harga ( Rp. ) 6

550,000.00 600,000.00 250,000.00

550,000.00 600,000.00 250,000.00

246,337.74 136,521.52 5,200.00 1,130,478.39 Jumlah PPN 10 % Jumlah Total Dibulatkan

4,052,430.72 5,037,643.90 1,902,680.00 55,789,108.61 : : : :

(Tujuh Puluh Lima Juta Rupiah)

Demak,

2015

KASI PERTAMANAN DAN PEMAKAM PADA BIDANG KEBERSIHAN DAN P DPU PPE KABUPATEN DEMAK SELAKU PEJABAT PEMBUAT KOMITMEN

ANDI ERWIN PRASETYO, ST NIP. 19720914 200312 1 002

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak TEMPAT PEKERJAAN

1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten

: : Batursari : Mranggen : Demak

Harga Perkiraan Sendiri (HPS) Untuk : Betonisasi Jalan RW. 03 Desa Batursari, Mranggen

Kegiatan APBD Perubahan Kabupaten Demak Tahun Anggar

No

Uraian Pekerjaan

Volume

Analis

1

2

3

4

I

II

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan

1.00 Ls 1.00 Ls 1.00 Ls

Taksir Taksir Taksir

Harga Satuan ( Rp. ) 5

Jumlah Harga ( Rp. ) 6

600,000.00 800,000.00 300,000.00

600,000.00 800,000.00 300,000.00

246,337.74 136,521.52 5,200.00 14,132.19 1,249,539.11 20,143.24 Jumlah PPN 10 % Jumlah Total Dibulatkan

8,204,623.30 6,962,597.27 3,801,200.00 31,642,761.35 127,452,989.14 2,054,610.82

PEK. KONSTRUKSI JALAN BETON BERTULANG Volume Jalan Beton = 110,00 m x 3,00 m x 0,15 m 1 Pek. Leveling Sirtu 2 Pek. Begesting Kayu 3 Pek. Lapis Plastik Kedap Air 4 Pek. Penulangan beton Ø 10 mm 5 Pek. Beton Struktur K.225 (Readymixed) 6 Penggunaan Vibrator

33.31 51.00 731.00 2,239.06 102.00 102.00

m3 m2 m2 Kg m3 m3

Dihit 1/2 B.21 Taksir B. 17 B.07b B. 15

: : : :

Terbilang :

(Duaratus Juta Rupiah)

Demak,

2015

KASI PERTAMANAN DAN PEMAKAMAN PADA BIDANG KEBERSIHAN DAN PJU DPU PPE KABUPATEN DEMAK SELAKU PEJABAT PEMBUAT KOMITMEN

ANDI ERWIN PRASETYO, ST NIP. 19720914 200312 1 002

PERHITUNGAN VOLUME PEKERJAAN JALAN BETON BERTULANG : Pembangunan Jalan Menuju Makam Desa Kebonbatur Kec. Mranggen Uk. 0,15 m' x 3,00 m'

RGI

a Kebonbatur Kec. Mranggen

No

emak Tahun Anggaran 2015

Harga Total ( Rp. ) 7

5

Extra Penyangga

No

2015

AN DAN PEMAKAMAN EBERSIHAN DAN PJU BUPATEN DEMAK

MBUAT KOMITMEN

PRASETYO, ST 14 200312 1 002

Uraian Pekerjaan Jumlah Segment Penulangan Melintang Memanjang

1,450,000.00

89,459,998.20 90,909,998.20 9,090,999.82 100,000,998.02 100,000,000.00

Uraian Pekerjaan 1 Pek. Urugan Padas 2 Pek. Leveling Sirtu 3 Pek. Begesting 4 Pek. Plastik

Uraian Pekerjaan 6 Pek Beton K. 225 7 Penggunaan Vibrator

T 0.14 0.05 0.15

L 3.00 3.00

P 30.00 110.00 110.00 110.00

3.30 Panjang

Q

2

Per segment 110.00

5.50

Hit =0,05+0,12+2,94+0,12+0,05 =0,05+5,44+0,05 =0,55+0,12+0,55 =0,01+0,12+0,1+0,12+0,1

P 3.28 5.54 1.12 0.45

T

L 3.00 3.00

0.15 0.15

Hit =5,5/0,5+1 =3/0,5+3 =(5,5/0,5-1)*2 =(5/1-1)*2

Q 12.00 9.00 20.00 8.00 Berat Besi Per Seg Berat Besi Per 20 Seg

P

Q 110.00 110.00

PERHITUNGAN VOLUME PEKERJAAN JALAN BETON : Betonisasi Jalan RT 06 RW II Desa Bandungrejo Kec. Mranggen Uk. 0,15 m' x 4,25 m' ; 0,15 m x 4,50 m; 0,15 m x 3,50 m; 0,15 m x 4,00 m

RGI

No

ungrejo Kec. Mranggen

emak Tahun Anggaran 2015

Uraian Pekerjaan 1 Pek. Leveling Sirtu A 2 Pek. Leveling Sirtu B 3 Pek. Leveling Sirtu C

4 Pek. Leveling Sirtu D Harga Total ( Rp. ) 7

No

No

1,600,000.00

No

No

180,218,196.94 181,818,196.94 18,181,819.69 200,000,016.64 200,000,000.00

2015

AN DAN PEMAKAMAN EBERSIHAN DAN PJU

P

l

T

34.30

4.25

76.00 19.00

4.50 3.50

43.00

4.00

0.05 0.05 0.05 0.05

P

Uraian Pekerjaan 2 Pek. Begesting A Pek. Begesting B Pek. Begesting C Pek. Begesting D

L

34.30 76.00 19.00 43.00 P 34.30

Uraian Pekerjaan 3 Pek. Plastik A Pek. Plastik B Pek. Plastik C Pek. Plastik D

L 4.55 4.80 3.80 4.30

76.00 19.00 43.00

Uraian Pekerjaan 4 Pek Beton K. 225 A Pek Beton K. 225 B Pek Beton K. 225 C Pek Beton K. 225 D

P 34.30

Uraian Pekerjaan 5 Penggunaan Vibrator A Penggunaan Vibrator B Penggunaan Vibrator C Penggunaan Vibrator D

Q

Total Leveling q 2

T 0.15 0.15 2 0.15 2 0.15 2 Jumlah Total Volume Bege T Q

76.00 19.00 43.00

l 4.25 4.50 3.50 4.00

T 0.15 0.15 0.15 0.15

P 34.30

l 4.25

T 0.15

76.00 19.00 43.00

4.50 3.50 4.00

0.15 0.15 0.15

Jumlah Total Volume P Q

Jumlah Total Volume B Q

Jumlah Total Volume Vib 6 Type A 1 Jumlah Segment Penulangan Melintang Memanjang Penyangga

Panjang

Per segment 34.30

Hit =0,05+0,12+4,19+0,12+0,05 =0,05+5,44+0,05 =0,01+0,12+0,1+0,12+0,1

5.50 P Hit 4.53 =5,5/0,5+1 5.54 =4,25/0,5+3

Q 12.00 11.50

0.45 =(5,5/1-1)*3

13.50

Berat Besi Per Seg Berat Besi Per 6 Seg

BUPATEN DEMAK

MBUAT KOMITMEN

PRASETYO, ST 14 200312 1 002

2 Sisa Segment =5,50*0,24

Panjang

Per segment 0.24

Penulangan Melintang Memanjang

Hit =0,05+0,12+4,19+0,12+0,05 =0,05+5,44+0,05

Penyangga

=0,01+0,12+0,1+0,12+0,1

Type B

Panjang

1 Jumlah Segment Penulangan Melintang Memanjang Penyangga

2 Sisa Segment =5,50*0,82 Penulangan Melintang Memanjang

Hit =0,05+0,12+4,44+0,12+0,05 =0,05+5,44+0,05 =0,01+0,12+0,1+0,12+0,1

P Hit 4.78 =5,5/0,5+1 5.54 =4,50/0,5+3 0.45 =(5/1-1)*3

Q 12.00 12.00

12.00 Berat Besi Per Seg Berat Besi Per 13 Seg

Per segment 0.82

Panjang

5.50 P 4.78 5.54 1.12 0.45

Hit =5,5/0,5+1 =4,50/0,5+3 =(5,5/0,5-1)*2 =(5/1-1)*3

Q 12.00 12.00 20.00 12.00 Berat Besi Per Seg Berat Besi Per 0,82 Seg

Per segment 19.00

Hit =0,05+0,12+3,44+0,12+0,05 =0,05+5,44+0,05 =0,01+0,12+0,1+0,12+0,1

5.50 P Hit 3.78 =5,5/0,5+1 5.54 =3,5/0,5+3

Q 12.00 10.00

0.45 =(5,5/1-1)*2

Panjang

9.00 Berat Besi Per Seg Berat Besi Per 3 Seg

Per segment 0.45

Penulangan Melintang Memanjang

Hit =0,05+0,12+2,94+0,12+0,05 =0,05+5,44+0,05

Penyangga

=0,01+0,12+0,1+0,12+0,1

Type D

Panjang

1 Jumlah Segment Penulangan

12.00 Berat Besi Per Seg Berat Besi Per 0,24 Seg

5.50

Panjang

Type C

2 Sisa Segment =5,50*0,45

0.45 =(5/1-1)*2

Q 12.00 11.50

Per segment

Extra Penyangga

Penyangga

P Hit 3.28 =5,5/0,5+1 5.54 =4,25/0,5+3

76.00

Hit =0,05+0,12+4,44+0,12+0,05 =0,05+5,44+0,05 =0,55+0,12+0,55 =0,01+0,12+0,1+0,12+0,1

1 Jumlah Segment Penulangan Melintang Memanjang

5.50

5.50 P Hit 3.78 =5,5/0,5+1 5.54 =3,5/0,5+3

Q 12.00 10.00

0.45 =(5,5/1-1)*2

9.00 Berat Besi Per Seg Berat Besi Per 0,45 Seg

Per segment 43.00 Hit

5.50 P

Hit

Q

RGI

ar Kec. Mranggen

Melintang Memanjang

=0,05+0,12+3,94+0,12+0,05 =0,05+5,44+0,05

4.28 =5,5/0,5+1 5.54 =4,5/0,5+3

Penyangga

=0,01+0,12+0,1+0,12+0,1

0.45 =(5,5/1-1)*2

2 Sisa Segment =5,50*0,82 Penulangan Melintang Memanjang Penyangga

Panjang

12.00 12.00

9.00 Berat Besi Per Seg Berat Besi Per 7 Seg

Per segment 0.82

Hit =0,05+0,12+3,94+0,12+0,05 =0,05+5,44+0,05 =0,01+0,12+0,1+0,12+0,1

5.50 P Hit 4.28 =5,5/0,5+1 5.54 =4/0,5+3

Q 12.00 11.00

0.45 =(5,5/1-1)*2

9.00 Berat Besi Per Seg Berat Besi Per 0,82 Seg

Total A+B+ Opritan Beton K. 225 Uraian Pekerjaan 1 Opritan Beton 1

P 1.00

2 Opritan Beton 2 3 Opritan Beton 3 4 Opritan Beton 4 5 Opritan Beton 4

1.00 1.00 1.00 1.00

No

l 5.50 4.00 2.00 5.00 5.00

T Q 0.15 2 0.15 2 0.15 2 0.15 2 0.15 2 Jumlah Volume Opritan b

PERHITUNGAN VOLUME PEKERJAAN JALAN BETON : Betonisasi Jalan RT. 02 RW. 02 Wringinjajar Kec. Mranggen Uk. 0,15 m' x 2,50 m'

No

Uraian Pekerjaan 1 Pek. Leveling Sirtu

T 0.05

L 2.50

P

Q 109.00

emak Tahun Anggaran 2015

2 Pek. Begesting 3 Pek. Plastik

Harga Total ( Rp. ) 7

0.15

109.00 109.00

2.80

Jumlah Segment

Panjang

Per segment 5.50

109.00 Penulangan Melintang Memanjang Penyangga

Hit =0,05+0,12+2,94+0,12+0,05 =0,05+5,44+0,05 =0,01+0,12+0,1+0,12+0,1

Sisa Segment

Panjang

P Hit 3.28 =5,5/0,5+1 5.54 =3/0,5+3 0.45 =(5/1-1)*2

1,450,000.00

66,732,355.31 68,182,355.31 6,818,235.53 75,000,590.84 75,000,000.00

No

Uraian Pekerjaan 4 Pek Beton K. 225 5 Penggunaan Vibrator

Q 12.00 9.00 8.00 Berat Besi Per Seg Berat Besi Per 26 Seg

Per segment 0.82

=5,50*0,82 Penulangan Melintang Memanjang Penyangga

2

Hit =0,05+0,12+2,94+0,12+0,05 =0,05+5,44+0,05 =0,01+0,12+0,1+0,12+0,1

5.50 P Hit 3.28 =5,5/0,5+1 5.54 =3/0,5+3 0.45 =(5/1-1)*2

T

Q 12.00 9.00 8.00 Berat Besi Per Seg Berat Besi Per 0,55 Seg

0.15 0.15

L 2.50 2.50

P

Q

69

11

759

63

4

139

556

46.33 110

109.00 109.00

2015

AN DAN PEMAKAMAN EBERSIHAN DAN PJU BUPATEN DEMAK

MBUAT KOMITMEN

PRASETYO, ST 14 200312 1 002

846.89 KG 814.44

1,372.59 114.38

PERHITUNGAN VOLUME PEKERJAAN JALAN BETON : Betonisasi Jalan RW 32 Desa Batursari Kec. Mranggen Uk. 0,15 m' x 3,00 m' ; 0,15 m x 2,50 m

RGI

No

ec. Mranggen

emak Tahun Anggaran 2015

Harga Total ( Rp. ) 7

1,400,000.00

66,781,863.24 68,181,863.24 6,818,186.32 75,000,049.56 75,000,000.00

2015

AN DAN PEMAKAMAN EBERSIHAN DAN PJU BUPATEN DEMAK

MBUAT KOMITMEN

PRASETYO, ST 14 200312 1 002

No

Uraian Pekerjaan 1 Pek. Leveling Sirtu 2 Pek. Begesting 3 Pek. Plastik 4 Pek Beton K. 225

T

Uraian Pekerjaan 1 Pek. Leveling Sirtu 2 Pek. Begesting 3 Pek. Plastik 4 Pek Beton K. 225

T

0.05 0.15 0.15

0.05 0.15 0.15

L 3.00

P 43.00 43.00 43.00 43.00

3.30 3.00

L 2.50 2.80 2.50

Q

P

2

Q 80.00 80.00 80.00 80.00

2

PERHITUNGAN VOLUME PEKERJAAN JALAN BETON BERTULANG : Betonisasi Jalan RW. 03 Desa Batursari, Mranggen

RGI

Uk. 0,15 m' x 3,00 m'

Mranggen

No

emak Tahun Anggaran 2015

Uraian Pekerjaan 1 Pek. Leveling Sirtu 2 Pek. Begesting 3 Pek. Plastik

Harga Total ( Rp. ) 7

4

Uraian Pekerjaan Jumlah Segment Penulangan Melintang Memanjang Extra Penyangga

1,700,000.00

No

Uraian Pekerjaan 5 Pek Beton K. 225 6 Penggunaan Vibrator 4

180,118,781.87 181,818,781.87 18,181,878.19 200,000,660.06 200,000,000.00

T

Uraian Pekerjaan =5,50*0,91 Penulangan Melintang Memanjang Extra Penyangga

L 0.05 0.15

P

4.00

170.00 170.00 170.00

4.30 Panjang

Q

2

Per segment 170.00

Hit =0,05+0,125+3,95+0,125+0,05 =0,05+5,45+0,05 =0,55+0,12+0,55 =0,01+0,125+0,1+0,125+0,1

T 0.15 0.15

5.50 P 4.30 5.55 1.12 0.55

L 4.00 4.00

Panjang

Hit =5,5/0,5+1 =3/0,5+3 =(5,5/0,5-1)*2 =(5,5/1-1)*3

Q 12.00 11.00 20.00 13.50 Berat Besi Per Seg Berat Besi Per 20 Seg

P

Q 170.00 170.00

Per segment 5.01

Hit =0,05+0,12+3,95+0,12+0,05 =0,05+5,45+0,05 =0,55+0,12+0,55 =0,1+0,125+0,1+0,125+0,1

5.50 P 4.30 5.55 1.12 0.55

Hit =5,5/0,5+1 =4/0,5+3 =(5,5/0,5-1)*2 =(5,5/1-1)*2

Q 12.00 11.00 20.00 13.50 Berat Besi Per Seg Berat Besi Per 0,91 Seg

2015

AN DAN PEMAKAMAN EBERSIHAN DAN PJU BUPATEN DEMAK

MBUAT KOMITMEN

PRASETYO, ST 14 200312 1 002

h

Koef 0.617 0.617

0.617 0.395 Berat Besi Per Segmen rat Besi Per 20 Segmen

Volume 12.36 16.50 33.00 363.00

Sat m3 m3 m2 m2

Keterangan V= T*L*P V= T*L*P V = T*P*Q V = L*P

Sat Volume 20.00 Sgmt Volume Sat 24.29 Kg 30.76 Kg 13.82 Kg 1.42 Kg 70.29 Kg 1,405.83 Kg

Keterangan

Volume 49.50 49.50

Sat m3 m3

V= P/Per Sgment Keterangan V = P*Q*K V = P*Q*K V = P*Q*K V = P*Q*K

Keterangan V= T*L*P V= T*L*P

Ø 13 Ø 10 Ø8 Ø6

= = = =

1.042 0.616 0.395 0.222

Volume

Sat

7.00 16.42 3.19 m3 8.14 Total Leveling Sirtu

h Total Volume Begesting

mlah Total Volume Plastik

mlah Total Volume Beton

ah Total Volume Vibrator

Koef 0.617 0.617 0.395

34.74 Volume 10.29 22.80 5.70 12.90 51.69 Volume 156.07 364.80 72.20 184.90 777.97 Volume 21.87 51.30 9.98 25.80 108.94 Volume 21.87 51.30 9.98 25.80 108.94

m3 Sat m2 m2 m2 m2 m2 Sat m2 m2 m2 m2 m2 Sat m3 m3 m3 m3 m3 Sat m3 m3 m3 m3 m3

Sat Volume 6.24 Sgmt Volume Sat 33.54 Kg 39.31 Kg 2.40

Kg

Keterangan V = P*L*T V= P*L*T V= P*L*T V= P*L*T Keterangan V= P*T*Q V= P*T*Q V= P*T*Q V= P*T*Q Keterangan V= P*L V= P*L V= P*L V= P*L Keterangan V= P*L*T V= P*L*T V= P*L*T V= P*L*T Keterangan V= P*L*T V= P*L*T V= P*L*T V= P*L*T

Keterangan V= P/Per Sgment Keterangan V= P*Q*K V = P*Q*K V = P*Q*K

Ø 13 Ø 10 Ø8 Ø6

= = = =

1.042 0.616 0.395 0.222

Berat Besi Per Segmen erat Besi Per 6 Segmen

75.25 451.49 Volume 1.32

Koef 0.617 0.617

0.395 Berat Besi Per Segmen t Besi Per 0,24 Segmen Total 1+2

Koef 0.617 0.617

0.395 Berat Besi Per Segmen rat Besi Per 13 Segmen

Koef 0.617 0.617

Kg Kg Sat m

V= P*P Segment

Volume 24.29 39.31

Sat Kg Kg

Keterangan V = P*Q*K V = P*Q*K

2.13 65.73 15.77

Kg Kg Kg

V = P*Q*K

467.27 Kg Sat Volume 13.82 Sgmt Volume Sat 35.39 Kg 41.02 Kg 2.13 78.54 1,021.05

Kg Kg Kg Sat Volume 4.51 m Volume 35.39 41.02 13.82 2.13

Sat Kg Kg

Berat Besi Per Segmen t Besi Per 0,82 Segmen

92.36 75.74

Kg Kg

Total 1+2

1,096.79

Kg

0.617 0.395

Koef 0.617 0.617

0.395 Berat Besi Per Segmen erat Besi Per 3 Segmen

Keterangan

Kg Kg

Sat Volume 3.45 Sgmt Volume Sat 27.99 Kg 34.18 Kg

V= P/Per Sgment Keterangan V = P*Q*K V = P*Q*K V = P*Q*K

Keterangan V= P*P Segment Keterangan V = P*Q*K V = P*Q*K V = P*Q*K V = P*Q*K

Keterangan V= P/Per Sgment Keterangan V = P*Q*K V = P*Q*K

Kg Kg Kg Sat Volume 2.48 m

V= P*P Segment

Volume 27.99 34.18

Sat Kg Kg

Keterangan V = P*Q*K V = P*Q*K

0.395 Berat Besi Per Segmen t Besi Per 0,45 Segmen

1.60 63.77 28.70

Kg Kg Kg

V = P*Q*K

Total 1+2

220.00

Kg

Koef 0.617 0.617

Koef

1.60 63.77 191.31

Keterangan

Sat Volume 7.82 Sgmt Volume Sat

V = P*Q*K

Keterangan

Keterangan V= P/Per Sgment Keterangan

0.617 0.617

0.395 Berat Besi Per Segmen erat Besi Per 7 Segmen

Koef 0.617 0.617

31.69 41.02

Kg Kg

V = P*Q*K V = P*Q*K

Kg Kg Kg Sat Volume 4.51 m

V = P*Q*K

1.60 74.31 520.15

Volume 31.69 37.60

Sat Kg Kg

0.395 Berat Besi Per Segmen t Besi Per 0,82 Segmen

1.60 70.89 58.13

Kg Kg Kg

Total 1+2 Total A+B+C+D

578.28 2,362.33

Kg Kg

Volume 0.41 0.30 0.15 0.38 0.38

Sat m3

h Volume Opritan beton

1.61

Volume 13.72

m3 m3 m3 m3 m3

Sat

Keterangan V= P*P Segment Keterangan V = P*Q*K V = P*Q*K V = P*Q*K

Keterangan V= P*L*T V = P*L*T V = P*L*T V = P*L*T V = P*L*T

Keterangan V= T*L*P

32.70 305.20

V = T*P*Q V = L*P

Sat Keterangan Volume 19.82 Sgmen V= P/Per Sgment

Koef 0.395 0.395 0.395 Berat Besi Per Segmen rat Besi Per 26 Segmen

Koef 0.395 0.395 0.395 Berat Besi Per Segmen t Besi Per 0,55 Segmen

1,315

Volume 15.55 19.69 1.42 36.66 696.61

Sat Kg Kg Kg Kg Kg

Keterangan V = P*Q*K V = P*Q*K V = P*Q*K

Volume Sat 4.51 m

Keterangan V= P*P Segment

Volume 15.55 19.69 1.42 36.66 30.06

Sat Kg Kg Kg Kg Kg

Keterangan V = P*Q*K V = P*Q*K V = P*Q*K

Volume Sat 40.88 m3 40.88 m3

Keterangan V= T*L*P V= T*L*P

Ø 13 Ø 10 Ø8 Ø6

= = = =

1.042 0.616 0.395 0.222

Volume 6.45 12.90 141.90 19.35

Sat

Volume 10.00 24.00 224.00 30.00

Sat

m3

m3

Keterangan V = T*L*P V = T*P*Q V = L*P V = T*L*P

Keterangan V = T*L*P V = T*P*Q V = L*P V = T*L*P

Ø 13 Ø 10 Ø8 Ø6

= = = =

1.042 0.616 0.395 0.222

h

Volume 33.31 51.00 731.00

Koef 0.617 0.617

0.617 0.395 Berat Besi Per Segmen rat Besi Per 20 Segmen

0.617 0.395 Berat Besi Per Segmen t Besi Per 0,91 Segmen

m3 m2 m2

Sat Volume 30.91 Sgmt Volume Sat 31.84 Kg 37.67 Kg Kg 2.93 Kg 72.44 Kg 2,173.14 Kg Volume 102.00 102.00

Koef 0.617 0.617

Sat

Keterangan V= T*L*P V = T*P*Q V = L*P Keterangan V= P/Per Sgment Keterangan V = P*Q*K V = P*Q*K V = P*Q*K V = P*Q*K

Sat m3 m3

Keterangan V= T*L*P V= T*L*P

Sat Volume 0.91 Sgmt Volume Sat 31.84 Kg 37.67 Kg Kg 2.93 Kg 72.44 Kg 65.92 Kg

Keterangan V= P/Per Sgment Keterangan V = P*Q*K V = P*Q*K V = P*Q*K V = P*Q*K

Ø 13 Ø 10 Ø8 Ø6

= = = =

1.042 0.616 0.395 0.222

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU No A. 1 2

TENAGA Pekerja Mandor

Uraian

Kode

Satuan

Koefisien

Harga Satuan (Rp)

Jumlah Harga (Rp)

OH OH

0.3000 0.0100

57,400.00 85,800.00 Jumlah Harga Tenaga Kerja

B. 1

BAHAN Bahan timbunan ( SIRTU )

m3

1.2000

166,600.00 Jumlah Harga Bahan

C.

PERALATAN

17,220.00 858.00

199,920.00

Jumlah Harga Peralatan D. E. F. B.21

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E ) 1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)

No A

B

Uraian

Kode

Satuan

Tenaga Pekerja Tukang kayu Kepala Tukang Mandor

OH OH OH OH

Bahan Multiflex 18 mm Kaso 5/7 kelas III Paku 5 & 7 cm myk bekisting

lbr m3 kg L

C

Peralatan

D E F

Jumlah A+B+C Overhead + Profit ( 13 %) Harga Satuan Pekerjaan per-m 2 (D+E)

Koefisien 0.200 0.600 0.060 0.020

0.35 0.02 0.25 0.20

Harga Satuan (Rp)

Jumlah Harga (Rp)

57,400.00 70,000.00 75,000.00 85,800.00 Jumlah Harga Tenaga Kerja 160,000.00 6,000,000.00 15,500.00 10,300.00 Jumlah Harga Bahan

11,480.00 42,000.00 4,500.00 1,716.00

56,000.00 120,000.00 3,875.00 2,060.00

Jumlah Harga Peralatan

B.07b No A

B

C

D E F

13 X D

1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 b) molen Jumlah Harga (Rp) Uraian Kode Satuan Koefisien Harga Satuan (Rp) Tenaga Pekerja OH 1.323 57,400.00 75,940.20 Tukang batu OH 0.189 70,000.00 13,230.00 Kepala Tukang OH 0.019 75,000.00 1,425.00 Mandor OH 0.132 85,800.00 11,325.60 Jumlah Harga Tenaga Kerja Bahan kg 1,438.00 533,498.00 Semen 371 kg 251.79 175,746.43 Pasir beton/PB 698 kg 152.83 160,016.50 Krikil/Kr 1047 L 50.00 10,750.00 Air 215 Jumlah Harga Bahan Peralatan sewa hari 73,966.51 18,491.63 Molen 0.250 Jumlah Harga Peralatan Jumlah A+B+C Overheat + Profit ( 13 %) 13 X D Harga Satuan Pekerjaan per-m3 (D+E)

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU No A. 1 2

TENAGA Pekerja Mandor

Uraian

Kode

Satuan

Koefisien

Harga Satuan (Rp)

Jumlah Harga (Rp)

OH OH

0.3000 0.0100

57,400.00 85,800.00 Jumlah Harga Tenaga Kerja

B. 1

BAHAN Bahan timbunan ( SIRTU )

m3

1.2000

166,600.00 Jumlah Harga Bahan

C.

PERALATAN

17,220.00 858.00

199,920.00

Jumlah Harga Peralatan D. E. F. B.21

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E ) 1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)

No A

B

Uraian

Kode

Satuan

Tenaga Pekerja Tukang kayu Kepala Tukang Mandor

OH OH OH OH

Bahan Multiflex 18 mm Kaso 5/7 kelas III Paku 5 & 7 cm myk bekisting

lbr m3 kg L

C

Peralatan

D E F

Jumlah A+B+C Overhead + Profit ( 13 %) Harga Satuan Pekerjaan per-m 2 (D+E)

Koefisien 0.200 0.600 0.060 0.020

0.35 0.02 0.25 0.20

Harga Satuan (Rp)

Jumlah Harga (Rp)

57,400.00 70,000.00 75,000.00 85,800.00 Jumlah Harga Tenaga Kerja 160,000.00 6,000,000.00 15,500.00 10,300.00 Jumlah Harga Bahan

11,480.00 42,000.00 4,500.00 1,716.00

56,000.00 120,000.00 3,875.00 2,060.00

Jumlah Harga Peralatan

B.07b No A

B

13 X D

1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 b) molen Jumlah Harga (Rp) Uraian Kode Satuan Koefisien Harga Satuan (Rp) Tenaga Pekerja OH 1.323 57,400.00 75,940.20 Tukang batu OH 0.189 70,000.00 13,230.00 Kepala Tukang OH 0.019 75,000.00 1,425.00 Mandor OH 0.132 85,800.00 11,325.60 Jumlah Harga Tenaga Kerja Bahan kg 1,438.00 533,498.00 Semen 371 kg 251.79 175,746.43 Pasir beton/PB 698 kg 152.83 160,016.50 Krikil/Kr 1047 L 50.00 10,750.00 Air 215 Jumlah Harga Bahan

C

Peralatan Molen

D E F

sewa hari

0.250

Jumlah A+B+C Overheat + Profit ( 13 %) Harga Satuan Pekerjaan per-m3 (D+E)

B.17

73,966.51 Jumlah Harga Peralatan

18,491.63

13 X D

Pembesian 100 kg dengan besi polos atau ulir

No A

B

C

Kode

Satuan

Tenaga Pekerja Tukang besi Kepala Tukang Mandor

Uraian

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Besi beton/ulir Kawat ikat

M.55.d M.60

kg kg

Koefisien 0.700 0.700 0.070 0.070

Jumlah harga

Harga Satuan

Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

10,700.00 Rp 105 Rp 17,800.00 Rp 1.5 Rp Jumlah Harga Bahan

40,180.00 49,000.00 5,250.00 6,006.00

1,123,500.00 26,700.00

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-100 kg (D+E)

B.15.

Penggunaan vibrator 1) manual Uraian Tenaga Pekerja

No A

B

Bahan

C

Peralatan Vibrator

13 X D

Kode

Satuan OH

Koefisien 0.250

Harga Satuan (Rp)

Jumlah Harga (Rp)

57,400.00 Jumlah Harga Tenaga Kerja

14,350.00

Jumlah Harga Bahan sewa hari

D

Jumlah A+B+C

E

Overhead + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

0.10

34,758.79 Jumlah Harga Peralatan

3,475.88

13 X D

Dihit. Pekerjaan Pengurugan 1 m3 dengan PADAS Uraian

Kode

Satuan

Koefisien

Harga Satuan (Rp)

Jumlah Harga (Rp)

No A. 1 2

TENAGA Pekerja Mandor

OH OH

0.3000 0.0100

57,400.00 85,800.00 Jumlah Harga Tenaga Kerja

B. 1

BAHAN Bahan timbunan ( PADAS )

m3

1.2000

115,000.00 Jumlah Harga Bahan

C.

PERALATAN Jumlah Harga Peralatan

D. E. F.

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E )

17,220.00 858.00

138,000.00

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU No A. 1 2

TENAGA Pekerja Mandor

Uraian

Kode

Satuan

Koefisien

Harga Satuan (Rp)

Jumlah Harga (Rp)

OH OH

0.3000 0.0100

Jumlah Harga Tenaga Kerja

-

B. 1

BAHAN Bahan timbunan ( SIRTU )

m3

1.2000

Jumlah Harga Bahan

-

C.

PERALATAN Jumlah Harga Peralatan

D. E. F. B.21 No A

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E ) 1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) Uraian Tenaga

Kode

Satuan

Koefisien

Harga Satuan (Rp)

Jumlah Harga (Rp)

B

C

Pekerja Tukang kayu Kepala Tukang Mandor

OH OH OH OH

0.2000 0.6000 0.0600 0.0200

Jumlah Harga Tenaga Kerja

-

Bahan Multiflex 18 mm Kaso 5/7 kelas III Paku 5 & 7 cm myk bekisting

lbr m3 kg L

0.3500 0.0200 0.2500 0.2000

Jumlah Harga Bahan

-

Peralatan Jumlah Harga Peralatan

D E F

Jumlah A+B+C Overhead + Profit ( 13 %) Harga Satuan Pekerjaan per-m 2 (D+E)

B.07b No A

B

C

D E F

13 X D

1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 b) molen Jumlah Harga (Rp) Uraian Kode Satuan Koefisien Harga Satuan (Rp) Tenaga Pekerja OH 1.3230 Tukang batu OH 0.1890 Kepala Tukang OH 0.0190 Mandor OH 0.1320 Jumlah Harga Tenaga Kerja Bahan kg Semen 371 kg Pasir beton/PB 698 kg Krikil/Kr 1047 L Air 215 Jumlah Harga Bahan Peralatan sewa hari Molen 0.2500 Jumlah Harga Peralatan Jumlah A+B+C Overheat + Profit ( 13 %) 13 X D Harga Satuan Pekerjaan per-m3 (D+E)

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU No A. 1

Uraian TENAGA Pekerja

Kode

Satuan OH

Koefisien 0.3000

Harga Satuan (Rp)

Jumlah Harga (Rp)

-

-

2

Mandor

OH

0.0100

Jumlah Harga Tenaga Kerja

-

B. 1

BAHAN Bahan timbunan ( SIRTU )

m3

1.2000

Jumlah Harga Bahan

-

C.

PERALATAN Jumlah Harga Peralatan

D. E. F. B.21

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E ) 1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)

No A

B

Uraian

Kode

Satuan

Tenaga Pekerja Tukang kayu Kepala Tukang Mandor

OH OH OH OH

Bahan Multiflex 18 mm Kaso 5/7 kelas III Paku 5 & 7 cm myk bekisting

lbr m3 kg L

C

Peralatan

D E F

Jumlah A+B+C Overhead + Profit ( 13 %) Harga Satuan Pekerjaan per-m 2 (D+E)

Koefisien 0.2000 0.6000 0.0600 0.0200

0.3500 0.0200 0.2500 0.2000

Harga Satuan (Rp)

Jumlah Harga (Rp)

Jumlah Harga Tenaga Kerja

-

Jumlah Harga Bahan

-

Jumlah Harga Peralatan

B.07b No A

B

C

D E F B.17

1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 b) molen Jumlah Harga (Rp) Uraian Kode Satuan Koefisien Harga Satuan (Rp) Tenaga Pekerja OH 1.3230 Tukang batu OH 0.1890 Kepala Tukang OH 0.0190 Mandor OH 0.1320 Jumlah Harga Tenaga Kerja Bahan kg Semen 371 kg Pasir beton/PB 698 kg Krikil/Kr 1047 L Air 215 Jumlah Harga Bahan Peralatan sewa hari Molen 0.250 Jumlah Harga Peralatan Jumlah A+B+C Overheat + Profit ( 13 %) 13 X D Harga Satuan Pekerjaan per-m3 (D+E) Pembesian 100 kg dengan besi polos atau ulir

No A

B

C

13 X D

Kode

Satuan

Tenaga Pekerja Tukang besi Kepala Tukang Mandor

Uraian

L.01 L.02 L.03 L.04

OH OH OH OH

0.7000 0.7000 0.0700 0.0700

Jumlah Harga Tenaga Kerja

-

Bahan Besi beton/ulir Kawat ikat

M.55.d M.60

kg kg

105 1.5000

Jumlah Harga Bahan

-

Peralatan

Koefisien

Harga Satuan

Jumlah harga

Jumlah Harga Peralatan D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-100 kg (D+E)

B.15.

Penggunaan vibrator 1) manual Uraian Tenaga Pekerja

No A

B

Bahan

C

Peralatan Vibrator

13 X D

Kode

Satuan OH

Koefisien 0.2500

Harga Satuan (Rp)

Jumlah Harga (Rp)

Jumlah Harga Tenaga Kerja

-

Jumlah Harga Bahan sewa hari

D

Jumlah A+B+C

E

Overhead + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

0.1000

Jumlah Harga Peralatan

-

13 X D

Dihit. Pekerjaan Pengurugan 1 m3 dengan PADAS Uraian

Kode

Satuan

Koefisien

Harga Satuan (Rp)

Jumlah Harga (Rp)

No A. 1 2

TENAGA Pekerja Mandor

OH OH

0.3000 0.0100

Jumlah Harga Tenaga Kerja

-

B. 1

BAHAN Bahan timbunan ( PADAS )

m3

1.2000

Jumlah Harga Bahan

-

C.

PERALATAN Jumlah Harga Peralatan

D. E. F.

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E )

B.13 B.13.a No

A

1 m3 beton menggunakan ready mixed dan bahan aditif 1 m3 beton menggunakan ready mixed dan pompa beton Satuan Koefisien Uraian Kode Tenaga Pekerja Tukang batu Kepala Tukang Mandor

L.01

OH

L.02

OH

L.03

OH

L.04

OH

1.000 0.250 0.025 0.100

Harga Hatuan Rp Rp Rp Rp

Jumlah harga

57,400.00 70,000.00 75,000.00 85,800.00

Rp Rp Rp Rp

57,400.00 17,500.00 1,875.00 8,580.00

Jumlah Harga Tenaga Kerja B

Bahan campuran beton ready mixed

M.09.x

m3

1.02 Rp 1,000,423.36 Rp

1,020,431.82

Jumlah Harga Bahan C

Peralatan pompa & conveyor beton

E.35

sewa hari

0.12 Rp

- Rp

Jumlah Harga Peralatan D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

13 X D

-

hps Jumlah Total (Rp)

18,078.00

199,920.00

217,998.00 28,339.74 246,337.74

Jumlah Total (Rp)

59,696.00

181,935.00

241,631.00 31,412.03 273,043.03

Jumlah Total (Rp)

101,920.80

880,010.93

18,491.63 1,000,423.36 130,055.04 1,130,478.39

Jumlah Total (Rp)

18,078.00

199,920.00

217,998.00 28,339.74 246,337.74

Jumlah Total (Rp)

59,696.00

181,935.00

241,631.00 31,412.03 273,043.03

Jumlah Total (Rp)

101,920.80

880,010.93

136521.52

18,491.63 1,000,423.36 130,055.04 1,130,478.39

Jumlah Total

Rp

100,436.00

Rp

1,150,200.00

Rp Rp

1,250,636.00

Rp

162,582.68

Rp 1,413,218.68

14,132.19

Jumlah Total (Rp)

14,350.00 0.00

3,475.88 17,825.88 2,317.36 20,143.24

Jumlah Total (Rp)

40.00 7,054,725.60

18,078.00

138,000.00

156,078.00 20,290.14 176,368.14

Bq Jumlah Total (Rp)

-

-

-

Jumlah Total (Rp)

-

-

-

Jumlah Total (Rp)

-

-

-

Jumlah Total (Rp)

-

-

-

Jumlah Total (Rp)

-

-

-

Jumlah Total (Rp)

-

-

-

Jumlah Total

-

-

-

Jumlah Total (Rp)

-

-

Jumlah Total (Rp)

-

-

-

Jumlah Total

Rp

85,355.00

Rp 1,020,431.82

Rp Rp 1,105,786.82

Rp 143,752.29 ###

KOP PERUSAHAAN BILL OF QUANTITY (BQ) TEMPAT PEKERJAAN

1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten

: : Kebonbatur : Mranggen : Demak

Harga Perkiraan Sendiri (HPS) Untuk : Pembangunan Jalan Menuju Makam Desa Kebonbatur Kec. M

Kegiatan APBD Perubahan Kabupaten Demak Tahun Anggara

No

Uraian Pekerjaan

Volume

Analis

1

2

3

4

I

II

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan

1.00 Ls 1.00 Ls 1.00 Ls

PEK. KONSTRUKSI JALAN BETON BERTULANG Volume Jalan Beton = 110,00 m x 3,00 m x 0,15 m 1 Pek Urugan Padas 12.39 2 Pek. Leveling Sirtu 16.50 3 Pek. Begesting Kayu 33.00 4 Pek. Lapis Plastik Kedap Air 363.00 5 Pek. Penulangan beton Ø 10 mm 1,405.83 6 Pek. Beton Struktur K.225 (molen) 49.50 7 Penggunaan Vibrator 49.50

m3 m3 m2 m2 Kg m3 m3

Harga Satuan ( Rp. ) 5

Taksir Taksir Taksir

-

-

Dihit Dihit 1/2 B.21 Taksir B. 17 B.07b B. 15

-

-

Jumlah PPN 10 % Jumlah Total Dibulatkan

Terbilang :

Jumlah Harga ( Rp. ) 6

: : : :

(..................................................................)

Demak,

2015

dibuat oleh PT. / CV …………………………………

…………………………….. DIREKTUR

KOP PERUSAHAAN BILL OF QUANTITY (BQ) TEMPAT PEKERJAAN

1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten

: : Bandungrejo : Mranggen : Demak

Harga Perkiraan Sendiri (HPS) Untuk : Betonisasi Jalan RT 06 RW II Desa Bandungrejo Kec. Mrangge

Kegiatan APBD Perubahan Kabupaten Demak Tahun Anggara

No

Uraian Pekerjaan

Volume

Analis

1

2

3

4

I

II

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan

1.00 Ls 1.00 Ls 1.00 Ls

PEK. KONSTRUKSI JALAN BETON BERTULANG Volume Jalan Beton A = 34,30 m x 4,25 m x 0,15 m Volume Jalan Beton B = 76 m x 4,50 m x 0,15 m Volume Jalan Beton C = 19 m x 3,50 m x 0,15 m Volume Jalan Beton D = 43 m x 4,00 m x 0,15 m 1 Pek. Leveling Sirtu 34.74 2 Pek. Begesting Kayu 51.69 3 Pek. Lapis Plastik Kedap Air 777.97 Pek. Penulangan Beton Ø 10 mm 4 2,362.33 5 Pek. Beton Struktur K.225 (molen) 110.55 6 Penggunaan Vibrator 108.94

m3 m2 m2 Kg m3 m3

Harga Satuan ( Rp. ) 5

Taksir Taksir Taksir

-

-

Dihit 1/2 B.21 Taksir B. 17 B.07b B. 15

-

-

Jumlah PPN 10 % Jumlah Total Dibulatkan

Terbilang :

Jumlah Harga ( Rp. ) 6

: : : :

( ............................................................ )

Demak,

2015

dibuat oleh PT. / CV …………………………………

…………………………….. DIREKTUR

KOP PERUSAHAAN BILL OF QUANTITY (BQ) TEMPAT PEKERJAAN

1. Kelurahan/Desa 2. Kecamatan

: : Wringinjajar : Mranggen

Harga Perkiraan Sendiri (HPS) Untuk : Betonisasi Jalan RT. 02 RW. 02 Wringinjajar Kec. Mranggen

3. Kabupaten

: Demak

Kegiatan APBD Perubahan Kabupaten Demak Tahun Anggara

No

Uraian Pekerjaan

Volume

Analis

1

2

3

4

I

II

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan

1.00 Ls 1.00 Ls 1.00 Ls

PEK. KONSTRUKSI JALAN BETON BERTULANG Volume Jalan Beton = 109 m x 2,50 m x 0,15 m 1 Pek. Leveling Sirtu 13.74 2 Pek. Begesting Kayu 32.70 3 Pek. Lapis Plastik Kedap Air 305.20 4 Pek. Penulangan Beton Ø 8 mm 726.68 5 Pek. Beton Struktur K.225 (molen) 40.88 6 Penggunaan Vibrator 40.88

m3 m2 m2 Kg m3 m3

Harga Satuan ( Rp. ) 5

Taksir Taksir Taksir

-

Dihit 1/2 B.21 Taksir B. 17 B.07b B. 15

-

-

Jumlah PPN 10 % Jumlah Total Dibulatkan

Terbilang :

Jumlah Harga ( Rp. ) 6

: : : :

(...................................................................)

Demak,

2015

dibuat oleh PT. / CV …………………………………

…………………………….. DIREKTUR

KOP PERUSAHAAN BILL OF QUANTITY (BQ) TEMPAT PEKERJAAN 1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten

: : Wringinjajar : Mranggen : Demak

Harga Perkiraan Sendiri (HPS) Untuk : Betonisasi Jalan RW 32 Desa Batursari Kec. Mranggen

Kegiatan APBD Perubahan Kabupaten Demak Tahun Anggara

No

Uraian Pekerjaan

Volume

Analis

1

2

3

4

I

II

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan PEK. KONSTRUKSI JALAN BETON Volume Jalan Beton A = 43 m x 3,00 m x 0,15 m Volume Jalan Beton B = 80 m x 2,50 m x 0,15 m 1 Pek. Leveling Sirtu 2 Pek. Begesting Kayu 3 Pek. Lapis Plastik Kedap Air 4 Pek. Beton Struktur K.225 (molen)

1.00 Ls 1.00 Ls 1.00 Ls

16.45 36.90 365.90 49.35

m3 m2 m2 m3

Harga Satuan ( Rp. ) 5

Taksir Taksir Taksir

-

Dihit 1/2 B.21 Taksir B.07b

-

-

Jumlah PPN 10 % Jumlah Total Dibulatkan

Terbilang :

Jumlah Harga ( Rp. ) 6

: : : :

( ............................................................. )

Demak,

2015

dibuat oleh PT. / CV …………………………………

…………………………….. DIREKTUR

PERHITUNGAN VOLUME PEKERJAAN JALAN BETON : Pembangunan Jalan Menuju Makam Desa Kebonbatur Kec. Mranggen Uk. 0,15 m' x 3,00 m'

a Kebonbatur Kec. Mranggen

No

emak Tahun Anggaran 2015

Harga Total ( Rp. ) 7

t

Uraian Pekerjaan 1 Pek. Urugan Padas 2 Pek. Leveling Sirtu 3 Pek. Begesting 4 Pek. Plastik Jumlah Segment

l 0.14 0.05 0.15

p 3.00 3.00

-

Extra Penyangga

Hit =0,05+0,12+2,94+0,12+0,05 =0,05+5,44+0,05 =0,55+0,12+0,55 =0,01+0,12+0,1+0,12+0,1

Sisa Segment

Panjang

-

P 3.28 5.54 1.12 0.45

Hit =0,05+0,12+2,94+0,12+0,05

Memanjang

=0,05+5,44+0,05 =0,55+0,12+0,55 =0,01+0,12+0,1+0,12+0,1

………………………..

………………..

q 12.00 9.00 20.00 8.00 Berat Besi Per Se Berat Besi Per 20 Se

5.50 P Hit 3.28 =5,5/0,5+1

0.15 0.15

q 12.00

5.54 =3/0,5+3 1.12 =(5,5/0,5-1)*2 0.45 =(5/1-1)*2

9.00 20.00 8.00 Berat Besi Per Se Berat Besi Per 0,55 Se

-

4 Pek Beton K. 225 5 Penggunaan Vibrator

Hit =5,5/0,5+1 =3/0,5+3 =(5,5/0,5-1)*2 =(5/1-1)*2

-

Penulangan Melintang

Extra Penyangga

5.50

Per segment

=5,50*0,18

-

2

Per segment 110.00

Penulangan Melintang Memanjang

2015

30.00 110.00 110.00 110.00

3.30 Panjang

q

3.00 3.00

110.00 110.00

PERHITUNGAN VOLUME PEKERJAAN JALAN BETON : Betonisasi Jalan RT 06 RW II Desa Bandungrejo Kec. Mranggen Uk. 0,15 m' x 4,25 m' ; 0,15 m x 4,50 m; 0,15 m x 3,50 m; 0,15 m x 4,00 m No

Uraian Pekerjaan 1 Pek. Leveling Sirtu A 2 Pek. Leveling Sirtu B 3 Pek. Leveling Sirtu C

ungrejo Kec. Mranggen

emak Tahun Anggaran 2015

4 Pek. Leveling Sirtu D Harga Total ( Rp. ) 7

No

No

-

No

No

-

2015

………………………..

P

l

T

34.30

4.25

76.00 19.00

4.50 3.50

43.00

4.00

0.05 0.05 0.05 0.05

P

Uraian Pekerjaan 2 Pek. Begesting A Pek. Begesting B Pek. Begesting C Pek. Begesting D

L

34.30 76.00 19.00 43.00 P 34.30

Uraian Pekerjaan 3 Pek. Plastik A Pek. Plastik B Pek. Plastik C Pek. Plastik D

L 4.55 4.80 3.80 4.30

76.00 19.00 43.00

Uraian Pekerjaan 4 Pek Beton K. 225 A Pek Beton K. 225 B Pek Beton K. 225 C Pek Beton K. 225 D

P 34.30

Uraian Pekerjaan 5 Penggunaan Vibrator A Penggunaan Vibrator B Penggunaan Vibrator C Penggunaan Vibrator D

Q

Total Levelin q 2

T 0.15 0.15 2 0.15 2 0.15 2 Jumlah Total Volume Beg T Q

76.00 19.00 43.00

l 4.25 4.50 3.50 4.00

T 0.15 0.15 0.15 0.15

P 34.30

l 4.25

T 0.15

76.00 19.00 43.00

4.50 3.50 4.00

0.15 0.15 0.15

Jumlah Total Volume Q

Jumlah Total Volume Q

Jumlah Total Volume V 6 Type A 1 Jumlah Segment Penulangan Melintang Memanjang Penyangga

Panjang

Per segment 34.30

Hit =0,05+0,12+4,19+0,12+0,05 =0,05+5,44+0,05 =0,01+0,12+0,1+0,12+0,1

5.50 P Hit 4.53 =5,5/0,5+1 5.54 =4,25/0,5+3

Q 12.00 11.50

0.45 =(5,5/1-1)*3

13.50

………………..

Berat Besi Per Se Berat Besi Per 6 Se 2 Sisa Segment =5,50*0,24

Panjang

Per segment 0.24

Penulangan Melintang Memanjang

Hit =0,05+0,12+4,19+0,12+0,05 =0,05+5,44+0,05

Penyangga

=0,01+0,12+0,1+0,12+0,1

Type B

Panjang

1 Jumlah Segment Penulangan Melintang Memanjang Penyangga

2 Sisa Segment =5,50*0,82 Penulangan Melintang Memanjang

Hit =0,05+0,12+4,44+0,12+0,05 =0,05+5,44+0,05 =0,01+0,12+0,1+0,12+0,1

P Hit 4.78 =5,5/0,5+1 5.54 =4,50/0,5+3

Q 12.00 12.00

0.45 =(5/1-1)*3

12.00 Berat Besi Per Se Berat Besi Per 13 Se

Per segment 0.82

Panjang

5.50 P 4.78 5.54 1.12 0.45

Hit =5,5/0,5+1 =4,50/0,5+3 =(5,5/0,5-1)*2 =(5/1-1)*3

Q 12.00 12.00 20.00 12.00 Berat Besi Per Se Berat Besi Per 0,82 Se

Per segment 19.00

Hit =0,05+0,12+3,44+0,12+0,05 =0,05+5,44+0,05 =0,01+0,12+0,1+0,12+0,1

5.50 P Hit 3.78 =5,5/0,5+1 5.54 =3,5/0,5+3

Q 12.00 10.00

0.45 =(5,5/1-1)*2

Panjang

9.00 Berat Besi Per Se Berat Besi Per 3 Se

Per segment 0.45

Penulangan Melintang Memanjang

Hit =0,05+0,12+2,94+0,12+0,05 =0,05+5,44+0,05

Penyangga

=0,01+0,12+0,1+0,12+0,1

Type D

Panjang

1 Jumlah Segment Penulangan

12.00 Berat Besi Per Se Berat Besi Per 0,24 Se

5.50

Panjang

Type C

2 Sisa Segment =5,50*0,45

0.45 =(5/1-1)*2

Q 12.00 11.50

Per segment

Extra Penyangga

Penyangga

P Hit 3.28 =5,5/0,5+1 5.54 =4,25/0,5+3

76.00

Hit =0,05+0,12+4,44+0,12+0,05 =0,05+5,44+0,05 =0,55+0,12+0,55 =0,01+0,12+0,1+0,12+0,1

1 Jumlah Segment Penulangan Melintang Memanjang

5.50

5.50 P Hit 3.78 =5,5/0,5+1 5.54 =3,5/0,5+3 0.45 =(5,5/1-1)*2

Q 12.00 10.00

9.00 Berat Besi Per Se Berat Besi Per 0,45 Se

Per segment 43.00 Hit

5.50 P

Hit

Q

ar Kec. Mranggen

Melintang Memanjang

=0,05+0,12+3,94+0,12+0,05 =0,05+5,44+0,05

4.28 =5,5/0,5+1 5.54 =4,5/0,5+3

Penyangga

=0,01+0,12+0,1+0,12+0,1

0.45 =(5,5/1-1)*2

2 Sisa Segment =5,50*0,82 Penulangan Melintang Memanjang Penyangga

Panjang

12.00 12.00

9.00 Berat Besi Per Se Berat Besi Per 7 Se

Per segment 0.82

Hit =0,05+0,12+3,94+0,12+0,05 =0,05+5,44+0,05 =0,01+0,12+0,1+0,12+0,1

5.50 P Hit 4.28 =5,5/0,5+1 5.54 =4/0,5+3

Q 12.00 11.00

0.45 =(5,5/1-1)*2

9.00 Berat Besi Per Se Berat Besi Per 0,82 Se

Total A+B Opritan Beton K. 225 Uraian Pekerjaan 1 Opritan Beton 1

P 1.00

2 Opritan Beton 2 3 Opritan Beton 3 4 Opritan Beton 4 5 Opritan Beton 4

1.00 1.00 1.00 1.00

No

l 5.50 4.00 2.00 5.00 5.00

T 0.15 0.15 0.15 0.15 0.15

l

p

Q 2 2 2 2 2 Jumlah Volume Opritan

PERHITUNGAN VOLUME PEKERJAAN JALAN BETON : Betonisasi Jalan RT. 02 RW. 02 Wringinjajar Kec. Mranggen Uk. 0,15 m' x 2,50 m'

No

Uraian Pekerjaan 1 Pek. Leveling Sirtu

t 0.05

2.50

q 109.00

emak Tahun Anggaran 2015

2 Pek. Begesting 3 Pek. Plastik

Harga Total ( Rp. ) 7

Jumlah Segment

0.15

109.00 109.00

2.80 Panjang

Per segment 109.00

Penulangan Melintang Memanjang Penyangga

Hit =0,05+0,12+2,94+0,12+0,05 =0,05+5,44+0,05 =0,01+0,12+0,1+0,12+0,1

Sisa Segment

Panjang

5.50 P Hit 3.28 =5,5/0,5+1 5.54 =3/0,5+3 0.45 =(5/1-1)*2

q 12.00 9.00 8.00 Berat Besi Per Se Berat Besi Per 26 Se

-

=5,50*0,82

-

Penulangan Melintang Memanjang Penyangga

Per segment 0.82

Hit =0,05+0,12+2,94+0,12+0,05 =0,05+5,44+0,05 =0,01+0,12+0,1+0,12+0,1

5.50 P Hit 3.28 =5,5/0,5+1 5.54 =3/0,5+3 0.45 =(5/1-1)*2

-

q 12.00 9.00 8.00 Berat Besi Per Se Berat Besi Per 0,55 Se

4 Pek Beton K. 225 5 Penggunaan Vibrator

2015

………………………..

………………..

2

0.15 0.15

2.50 2.50

109.00 109.00

PERHITUNGAN VOLUME PEKERJAAN JALAN BETON : Betonisasi Jalan RW 32 Desa Batursari Kec. Mranggen Uk. 0,15 m' x 3,00 m' No

ec. Mranggen

emak Tahun Anggaran 2015

Harga Total ( Rp. ) 7

No

-

-

2015

………………………..

………………..

Uraian Pekerjaan 1 Pek. Leveling Sirtu 2 Pek. Begesting 3 Pek. Plastik 4 Pek Beton K. 225

t

Uraian Pekerjaan 1 Pek. Leveling Sirtu 2 Pek. Begesting 3 Pek. Plastik 4 Pek Beton K. 225

t

l 0.05 0.15

p 3.00

l 0.05 0.15 0.15

43.00 43.00 43.00 43.00

3.30 3.00

0.15

q

p 2.50 2.80 2.50

2

q 80.00 80.00 80.00 80.00

2

h

Volume Sat Keterangan 12.39 16.50 v = t*l*p 33.00 v = t*p*q 363.00 v = l*p

20.00 Koef 0.617 0.617

0.617 0.395 Berat Besi Per Segmen rat Besi Per 20 Segmen

Volume 24.29 30.76 13.82 1.42 70.29 1,405.83

Sat Kg Kg

Keterangan

Kg Kg Kg Kg

- m Koef 0.617

Volume 24.29

Sat Kg

0.617

30.76 13.82 1.42 70.29 -

Kg

0.617 0.395 Berat Besi Per Segmen t Besi Per 0,55 Segmen

Keterangan

Kg Kg Kg Kg

49.50 m3 49.50 m3

v = t*l*p

Volume

Sat

7.00 16.42 3.19 m3 8.14 Total Leveling Sirtu

h Total Volume Begesting

mlah Total Volume Plastik

mlah Total Volume Beton

ah Total Volume Vibrator

Koef 0.617 0.617 0.395

Keterangan V = P*L*T V= P*L*T V= P*L*T V= P*L*T

34.74 m3 Volume Sat Keterangan 10.29 m2 V= P*T*Q 22.80 m2 V= P*T*Q 5.70 m2 V= P*T*Q 12.90 m2 V= P*T*Q 51.69 m2 Volume Sat Keterangan 156.07 m2 V= P*L 364.80 m2 V= P*L 72.20 m2 V= P*L 184.90 m2 V= P*L 777.97 m2 Volume Sat Keterangan 21.87 m3 V= P*L*T 51.30 m3 V= P*L*T 9.98 m3 V= P*L*T 25.80 m3 V= P*L*T 108.94 m3 Volume Sat Keterangan 21.87 m3 V= P*L*T 51.30 m3 V= P*L*T 9.98 m3 V= P*L*T 25.80 m3 V= P*L*T 108.94 m3 Sat Keterangan Volume 6.24 Sgmt V= P/Per Sgment Volume Sat Keterangan 33.54 Kg V= P*Q*K 39.31 Kg V = P*Q*K 2.40

Kg

V = P*Q*K

Berat Besi Per Segmen erat Besi Per 6 Segmen

75.25 451.49 Volume 1.32

Koef 0.617 0.617

0.395 Berat Besi Per Segmen t Besi Per 0,24 Segmen Total 1+2

Koef 0.617 0.617

0.395 Berat Besi Per Segmen rat Besi Per 13 Segmen

Koef 0.617 0.617 0.617 0.395

Volume 24.29 39.31 2.13 65.73 15.77

Kg Kg Sat m

Kg Kg Kg

2.13 78.54 1,021.05

Kg V = P*Q*K Kg Kg Sat Keterangan Volume 4.51 m V= P*P Segment Volume Sat Keterangan 35.39 Kg V = P*Q*K 41.02 Kg V = P*Q*K 13.82 Kg V = P*Q*K 2.13 Kg V = P*Q*K Kg Kg

Total 1+2

1,096.79

Kg

Koef 0.617 0.617

Sat Keterangan Volume 3.45 Sgmt V= P/Per Sgment Volume Sat Keterangan 27.99 Kg V = P*Q*K 34.18 Kg V = P*Q*K 1.60 63.77 191.31

Kg V = P*Q*K Kg Kg Sat Keterangan Volume 2.48 m V= P*P Segment Volume 27.99 34.18

Sat Keterangan Kg V = P*Q*K Kg V = P*Q*K

0.395 Berat Besi Per Segmen t Besi Per 0,45 Segmen

1.60 63.77 28.70

Kg Kg Kg

Total 1+2

220.00

Kg

Koef

V = P*Q*K

467.27 Kg Sat Keterangan Volume 13.82 Sgmt V= P/Per Sgment Volume Sat Keterangan 35.39 Kg V = P*Q*K 41.02 Kg V = P*Q*K

92.36 75.74

0.395 Berat Besi Per Segmen erat Besi Per 3 Segmen

V= P*P Segment

Sat Keterangan Kg V = P*Q*K Kg V = P*Q*K

Berat Besi Per Segmen t Besi Per 0,82 Segmen

Koef 0.617 0.617

Keterangan

V = P*Q*K

Sat Keterangan Volume 7.82 Sgmt V= P/Per Sgment Volume Sat Keterangan

0.617 0.617

0.395 Berat Besi Per Segmen erat Besi Per 7 Segmen

Koef 0.617 0.617

31.69 41.02

Kg Kg

1.60 74.31 520.15

Kg V = P*Q*K Kg Kg Sat Keterangan Volume 4.51 m V= P*P Segment Volume Sat Keterangan 31.69 Kg V = P*Q*K 37.60 Kg V = P*Q*K

0.395 Berat Besi Per Segmen t Besi Per 0,82 Segmen

1.60 70.89 58.13

Kg Kg Kg

Total 1+2 Total A+B+C+D

578.28 2,362.33

Kg Kg

Volume 0.41 0.30 0.15 0.38 0.38

h Volume Opritan beton

h

V = P*Q*K V = P*Q*K

1.61

Volume 13.74

V = P*Q*K

Sat Keterangan m3 V= P*L*T m3 V = P*L*T m3 V = P*L*T m3 V = P*L*T m3 V = P*L*T m3

Sat

Keterangan v = t*l*p

Koef 0.395 0.395 0.395 Berat Besi Per Segmen rat Besi Per 26 Segmen

Koef 0.395 0.395 0.395 Berat Besi Per Segmen t Besi Per 0,55 Segmen

32.70 305.20

v = t*p*q v = l*p

19.82 Volume 15.55 19.69 1.42 36.66 696.61

Sat Kg Kg Kg Kg Kg

Keterangan

4.51 m Volume 15.55 19.69 1.42 36.66 30.06

Sat Kg Kg Kg Kg Kg

40.88 m3 40.88 m3

Keterangan

v = t*l*p

h

h

Volume 6.45 12.90 141.90 19.35

Sat

Volume 10.00 24.00 224.00 30.00

Sat

m3

m3

Keterangan v = t*l*p v = t*p*q v = l*p v = t*l*p

Keterangan v = t*l*p v = t*p*q v = l*p v = t*l*p

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO

URAIAN

SATUAN

KODE

1

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU 1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) 1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 b) molen

m3

Dihit

246,337.74

m2

1/2 B.21

136,521.52

m3

B.07b

2 3

Harga Satuan

1,130,478.39

DAFTAR SEWA PERALATAN

NO

1 2 3 4 5

NAMA ALAT

Concrete Mixer (350) Dump Truck 3.5 Ton Concrete Vibrator Stamper Vibratory Roller 5-8 T

KODE

HP

20 100 5.5 4.7 82

KAPASITAS SATUAN

350 3.5 25 121 7.1

Liter Ton Ton Ton

SEWA ALAT (Rp)

73,966.51 338,467.63 34,758.79 33,746.27 18,375.00

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO

URAIAN

SATUAN

KODE

1

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU 1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) 1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 b) molen Pembesian 100 kg dengan besi polos atau ulir 1 m3 Penggunaan Vibrator

m3

Dihit

246,337.74

m2

1/2 B.21

136,521.52

kg

B.07b

1,130,478.39

m3 m3

B.17 B.15

1,413,218.68 20,143.24

2 3 4 5

Harga Satuan

DAFTAR SEWA PERALATAN

NO

1 2 3 4 5

NAMA ALAT

Concrete Mixer (350) Dump Truck 3.5 Ton Concrete Vibrator Stamper Vibratory Roller 5-8 T

KODE

HP

20 100 5.5 4.7 82

KAPASITAS SATUAN

350 3.5 25 121 7.1

Liter Ton Ton Ton

SEWA ALAT (Rp)

73,966.51 338,467.63 34,758.79 33,746.27 18,375.00

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO

URAIAN

SATUAN

KODE

1

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU 1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) 1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 b) molen Pembesian 100 kg dengan besi polos atau ulir 1 m3 Penggunaan Vibrator

m3

Dihit

246,337.74

m2

1/2 B.21

136,521.52

kg

B.07b

1,130,478.39

m3 m3

B.17 B.15

1,413,218.68 20,143.24

m3

Dihit

176,368.14

2 3 4 5

6 Dihit. Pekerjaan Pengurugan 1 m3 dengan PADAS

Harga Satuan

DAFTAR SEWA PERALATAN

NO

1 2 3 4 5

NAMA ALAT

Concrete Mixer (350) Dump Truck 3.5 Ton Concrete Vibrator Stamper Vibratory Roller 5-8 T

KODE

HP

20 100 5.5 4.7 82

KAPASITAS SATUAN

350 3.5 25 121 7.1

Liter Ton Ton Ton

SEWA ALAT (Rp)

73,966.51 338,467.63 34,758.79 33,746.27 18,375.00

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO

URAIAN

SATUAN

KODE

1

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU 1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) 1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 b) molen

m3

Dihit

-

m2

1/2 B.21

-

m3

B.07b

-

2 3

Harga Satuan

DAFTAR SEWA PERALATAN

NO

1 2 3 4 5

NAMA ALAT

Concrete Mixer (350) Dump Truck 3.5 Ton Concrete Vibrator Stamper Vibratory Roller 5-8 T

KODE

HP

20 100 5.5 4.7 82

KAPASITAS SATUAN

350 3.5 25 121 7.1

Liter Ton Ton Ton

SEWA ALAT (Rp)

-

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO

URAIAN

SATUAN

KODE

1

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU 1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) 1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 b) molen Pembesian 100 kg dengan besi polos atau ulir 1 m3 Penggunaan Vibrator

m3

Dihit

-

m2

1/2 B.21

-

kg

B.07b

-

m3 m3

B.17 B.15

-

2 3 4 5

Harga Satuan

DAFTAR SEWA PERALATAN

NO

NAMA ALAT

KODE

HP

KAPASITAS SATUAN

SEWA ALAT (Rp)

1 2 3 4 5

Concrete Mixer (350) Dump Truck 3.5 Ton Concrete Vibrator Stamper Vibratory Roller 5-8 T

20 100 5.5 4.7 82

350 3.5 25 121 7.1

Liter Ton Ton Ton

-

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO

URAIAN

SATUAN

KODE

1

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU 1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) 1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 b) molen Pembesian 100 kg dengan besi polos atau ulir

m3

Dihit

-

m2

1/2 B.21

-

kg

B.07b

-

m3

B.17

-

2 3 4

Harga Satuan

5 6

1 m3 Penggunaan Vibrator

m3

B.15

-

Dihit. Pekerjaan Pengurugan 1 m3 dengan PADAS

m3

Dihit

-

DAFTAR SEWA PERALATAN

NO

1 2 3 4 5

NAMA ALAT

Concrete Mixer (350) Dump Truck 3.5 Ton Concrete Vibrator Stamper Vibratory Roller 5-8 T

KODE

HP

20 100 5.5 4.7 82

KAPASITAS SATUAN

350 3.5 25 121 7.1

SEWA ALAT (Rp)

Liter Ton Ton Ton

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

-

NO

1

URAIAN

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU

SATUAN

KODE

m3

Dihit

Harga Satuan

246,266.28

DAFTAR SEWA PERALATAN

NO

1

NAMA ALAT

Tree Wheel Roller 6-8 T

KODE

HP

55

KAPASITAS SATUAN

8

Ton

SEWA ALAT (Rp)

219,677.34

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO

1

URAIAN

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU

SATUAN

KODE

m3

Dihit

Harga Satuan

-

DAFTAR SEWA PERALATAN

NO

1

NAMA ALAT

Tree Wheel Roller 6-8 T

KODE

HP

55

KAPASITAS SATUAN

8

Ton

SEWA ALAT (Rp)

-

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak TEMPAT PEKERJAAN 1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten

: : Batursari : Mranggen : Demak

Harga Perkiraan sendiri (HPS) Untuk : Pavingisasi Jalan Argo Santoso Batursari Kec. Mranggen Kegiatan APBD Perubahan Kabupaten Demak Tahun 2015

No

Uraian Pekerjaan

Volume

Analis

Harga Satuan ( Rp. )

Jumlah Harga ( Rp. )

1

2

3

4

5

6

I

II

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan

1.00 Ls 1.00 Ls 1.00 Ls

Taksir Taksir Taksir

550,000.00 650,000.00 250,000.00

550,000.00 650,000.00 250,000.00

PEK. JALAN PAVING BLOK NATURAL 6 CM K.300 Volume Jalan Paving = 130,00 m x 3,00 m 1 Pek. Perataan sirtu 11.15 m3 2 Pek. Paving Blok Natural 6 cm K.300 390.00 m2 3 Pek. Kanstein Beton K. 225 (manual) 260.00 m'

Dihit. A.121 B.07a

246,337.74 202,998.85 22,191.66 136,521.52

2,745,729.72 79,169,551.50 5,769,830.84 1,774,779.70

4 Pek. Begesting Kayu

13.00 m2

1/2 B. 21 Jumlah

:

PPN 10 % Jumlah Total Dibulatkan

: : :

Terbilang : (Seratus Juta Rupiah)

Demak,

2015

KASI PERTAMANAN DAN PEMAKAMA PADA BIDANG KEBERSIHAN DAN PJ DPU PPE KABUPATEN DEMAK SELAKU PEJABAT PEMBUAT KOMITMEN

ANDI ERWIN PRASETYO, ST NIP. 19720914 200312 1 002

KOP PERUSAHAAN BILL OF QUANTITY (BQ) TEMPAT PEKERJAAN 1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten

: : Batursari : Mranggen : Demak

Harga Perkiraan sendiri (HPS) Untuk : Pavingisasi Jalan Argo Santoso Batursari Kec. Mranggen Kegiatan APBD Perubahan Kabupaten Demak Tahun 2015

No

Uraian Pekerjaan

Volume

Analis

Harga Satuan ( Rp. )

Jumlah Harga ( Rp. )

1

2

3

4

5

6

I

II

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan

1.00 Ls 1.00 Ls 1.00 Ls

Taksir Taksir Taksir

-

-

PEK. JALAN PAVING BLOK NATURAL 6 CM K.300 Volume Jalan Paving = 130,00 m x 3,00 m 1 Pek. Perataan sirtu 11.15 m3 2 Pek. Paving Blok Natural 6 cm K.300 390.00 m2 3 Pek. Kanstein Beton K. 225 (manual) 260.00 m'

Dihit. A.121 Dihit.

-

-

4 Pek. Begesting Kayu

Terbilang :

13.00 m2

1/2 B. 21 Jumlah

:

PPN 10 % Jumlah Total Dibulatkan

: : :

( .................................................................. )

Demak,

2015

dibuat oleh PT. / CV ………………………………

…………………………….. DIREKTUR

PERHITUNGAN VOLUME PEKERJAAN JALAN PAVING :

AN ENERGI

Pavingisasi Jalan Argo Santoso Batursari Kec. Mranggen Uk. No

i Kec. Mranggen

3,00 m Uraian Pekerjaan

1 Pek. Perataan sirtu 2 Pek. Paving Blok Natural 6 cm K.300

p

l

130.00

3.00

130.00

3.00

t 0.03

q

n

Demak Tahun 2015 3 Pek. beton K. 225

Harga Total ( Rp. )

Pek. Kanstein Beton K. 225 (manual)

7

1.00 1.00

1.00 0.2

1.00 0.1

130.00

2

4 Pek. Begesting Kayu 130.00

1,450,000.00

89,459,891.75 90,909,891.75 9,090,989.17 100,000,880.92 100,000,000.00

2015

NAN DAN PEMAKAMAN KEBERSIHAN DAN PJU KABUPATEN DEMAK

EMBUAT KOMITMEN

WIN PRASETYO, ST 0914 200312 1 002

1

0.2

2

PERHITUNGAN VOLUME PEKERJAAN JALAN PAVING : Pavingisasi Jalan Argo Santoso Batursari Kec. Mranggen Uk. No

i Kec. Mranggen

3,00 m Uraian Pekerjaan

1 Pek. Perataan sirtu 2 Pek. Paving Blok Natural 6 cm K.300

p

l

130.00

3.00

130.00

3.00

t 0.03

q

n

Demak Tahun 2015 3 Pek. beton K. 225

Harga Total ( Rp. )

Pek. Kanstein Beton K. 225 (manual)

7

1.00 1.00

1.00 0.2

1.00 0.1

130.00

2

4 Pek. Begesting Kayu 130.00

-

-

2015

……………………………..

1

0.2

2

……………………..

h

Volume

Keterangan

11.15 V = p*l*t 390.00 V = p*l 1.00 V = p*l*t 1,109,582.85 0.02 V = p*l*t*q 22,191.66 260.00 V = p*q 13 V = p*l*t

h

Volume

Keterangan

11.15 V = p*l*t 390.00 V = p*l 1.00 V = p*l*t 0.02 V = p*q 260.00 V = p*l*t*q 13

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU No

Uraian

Kode

Satuan

Koefisien

Harga Satuan (Rp)

Jumlah Harga (Rp)

A. 1 2

TENAGA Pekerja Mandor

OH OH

0.3000 0.0100

57,400.00 85,800.00 Jumlah Harga Tenaga Kerja

B. 1

BAHAN Bahan timbunan ( SIRTU )

m3

1.2000

166,600.00 Jumlah Harga Bahan

C.

PERALATAN

17,220.00 858.00

199,920.00

Jumlah Harga Peralatan D. E.

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D

F.

Harga satuan pekerjaan ( D + E )

A.121

Pekerjaan Pasang Paving Blok natural 6 cm K. 300 (per m2)

No

Uraian

Koefisien

Harga Satuan (Rp)

Jumlah Harga (Rp)

TENAGA Pekerja Tukang batu

OH OH

0.2500 0.5000

Kepala Tukang Mandor

OH OH

0.0500 0.0250

75,000.00 85,800.00 Jumlah Harga Tenaga Kerja

B. 1 2

BAHAN Paving Blok Natural 6 cm Pasir Beton

m2 m3

1.0100 0.1000

85,000.00 352,500.00 Jumlah Harga Bahan

85,850.00 35,250.00

C.

PERALATAN

Lot

1.0000

3,300.00 Jumlah Harga Peralatan

3,300.00

D. E.

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D

F.

Harga satuan pekerjaan ( D + E )

57,400.00 70,000.00

14,350.00 35,000.00 3,750.00 2,145.00

1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 Kode

Satuan

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

No

B

Satuan

A. 1 2 3 4

B.07 a) manual A

Kode

Uraian

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Koefisien 1.3230 0.1890 0.0190 0.1320

371 698 1047 215

Harga Hatuan

Jumlah harga

57,400.00 70,000.00 75,000.00 85,800.00 Jumlah Harga Tenaga Kerja 1,438.00 251.79 152.83 50.00 Jumlah Harga Bahan Jumlah Harga Peralatan

13 X D

75,940.20 13,230.00 1,425.00 11,325.60

533,498.00 175,746.43 160,016.50 10,750.00

B.21

1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) No A

B

C

Uraian

Kode

Satuan

Tenaga Pekerja Tukang kayu Kepala Tukang Mandor

OH OH OH OH

Bahan Multiflex 18 mm Kaso 5/7 kelas III Paku 5 & 7 cm myk bekisting

lbr m3 kg L

Koefisien 0.200 0.600 0.060 0.020

0.35 0.02 0.25 0.20

Harga Satuan (Rp)

Jumlah Harga (Rp)

57,400.00 70,000.00 75,000.00 85,800.00 Jumlah Harga Tenaga Kerja 160,000.00 6,000,000.00 15,500.00 10,300.00 Jumlah Harga Bahan

Peralatan Jumlah Harga Peralatan

D E F

Jumlah A+B+C Overhead + Profit ( 13 %) Harga Satuan Pekerjaan per-m 2 (D+E)

13 X D

11,480.00 42,000.00 4,500.00 1,716.00

56,000.00 120,000.00 3,875.00 2,060.00

Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU No A. 1 2

Uraian

Kode

Satuan

Koefisien

Harga Satuan (Rp)

Jumlah Harga (Rp)

TENAGA Pekerja Mandor

OH OH

0.3000 0.0100

Jumlah Harga Tenaga Kerja

-

B. 1

BAHAN Bahan timbunan ( SIRTU )

m3

1.2000

Jumlah Harga Bahan

-

C.

PERALATAN Jumlah Harga Peralatan

D. E.

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D

F.

Harga satuan pekerjaan ( D + E )

A.121

Pekerjaan Pasang Paving Blok natural 6 cm K. 300 (per m2)

No

Uraian

Kode

Satuan

Koefisien

Harga Satuan (Rp)

Jumlah Harga (Rp)

A. 1 2 3 4

TENAGA Pekerja Tukang batu

OH OH

0.2500 0.5000

Kepala Tukang Mandor

OH OH

0.0500 0.0250

Jumlah Harga Tenaga Kerja

B. 1 2

BAHAN Paving Blok Natural 6 cm Pasir Beton

m2 m3

1.0100 0.1000

Jumlah Harga Bahan

-

C.

PERALATAN

Lot

1.0000

Jumlah Harga Peralatan

-

D.

Jumlah harga tenaga, bahan dan peralatan ( A + B + C )

-

-

E.

Overhead & profit, contoh 13% x D

F.

Harga satuan pekerjaan ( D + E )

B.07 a) manual

1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 Kode

Satuan

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

L.01 L.02 L.03 L.04

OH OH OH OH

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

No A

B

C

Uraian

Koefisien 1.3230 0.1890 0.0190 0.1320

371 698 1047 215

Harga Hatuan

Jumlah harga

Jumlah Harga Tenaga Kerja

-

Jumlah Harga Bahan

-

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.21

1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) No A

B

C

Uraian

13 X D

Kode

Satuan

Tenaga Pekerja Tukang kayu Kepala Tukang Mandor

OH OH OH OH

Bahan Multiflex 18 mm Kaso 5/7 kelas III Paku 5 & 7 cm myk bekisting

lbr m3 kg L

Koefisien 0.200 0.600 0.060 0.020

0.35 0.02 0.25 0.20

Harga Satuan (Rp)

Jumlah Harga (Rp)

Jumlah Harga Tenaga Kerja

-

Jumlah Harga Bahan

-

Peralatan Jumlah Harga Peralatan

D E F

Jumlah A+B+C Overhead + Profit ( 13 %) Harga Satuan Pekerjaan per-m 2 (D+E)

13 X D

Jumlah Total (Rp)

18,078.00

199,920.00

217,998.00 28,339.74 246,337.74

Jumlah Total (Rp)

55,245.00

121,100.00 3,300.00 179,645.00 23,353.85 202,998.85

Jumlah Total

101,920.80

880,010.93 981,931.73 127,651.12 1,109,582.85

Jumlah Total (Rp)

59,696.00

181,935.00

241,631.00 31,412.03 273,043.03

Jumlah Total (Rp)

-

-

-

Jumlah Total (Rp)

-

-

-

Jumlah Total

-

-

Jumlah Total (Rp)

-

-

-

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO

URAIAN

SATUAN

KODE

1 1

2 Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU

3 m3

4 Dihit

2

1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)

m2

1/2 B.21

3

1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 a) manual

m3

B.07a

4

Pekerjaan Pasang Paving Blok natural 6 cm K. 300 (per m2)

m2

A. 121

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO 1 1

URAIAN 2 Dihit. Pekerjaan Pengurugan 1 m3 dengan SIRTU

SATUAN 3 m3

KODE 4 Dihit

2

1 m2 bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)

m2

1/2 B.21

3

1 m3 beton mutu, f'c = 19,3 Mpa(K225), slump (12 ± 2) cm, w/c = 0,58 a) manual

m3

B.07a

4

Pekerjaan Pasang Paving Blok natural 6 cm K. 300 (per m2)

m2

A. 121

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO 1 1 2 3

4 5 6 7 8

URAIAN 2

1 m3 galian tanah biasa sedalam < 1 m 1m Panjang cerucuk bambu diameter 8 cm - 10 cm 1m3 timbunan pasir sebagai bahan pengisi (1m3) 1 m3 batu kosong ( anstamping ) 1m3 Pas. Batu Campuran 1Pc : 5 Ps Pas. Pipa suling - suling 1m' 1m2 Plesteran 1Pc : 5Ps tebal 15 mm 1 m3 Urugan tanah kembali (1m3 )

SATUAN 3

KODE 4

m3 m1 m3 m3 m3 m' m2 m3

T. 06a P.07b T. 14c A. 3.2.1 .8 P.01d P. 16a A. 4.4.2.5 T. 14a

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

NO

URAIAN

SATUAN

KODE

1 1 2 3

4 5 6 7 8

2

1 m3 galian tanah biasa sedalam < 1 m 1m Panjang cerucuk bambu diameter 8 cm - 10 cm 1m3 timbunan pasir sebagai bahan pengisi (1m3) 1 m3 batu kosong ( anstamping ) 1m3 Pas. Batu Campuran 1Pc : 5 Ps Pas. Pipa suling - suling 1m' 1m2 Plesteran 1Pc : 5Ps tebal 15 mm 1 m3 Urugan tanah kembali (1m3 )

3

4

m3 m1 m3 m3 m3 m' m2 m3

T. 06a P.07b T. 14c A. 3.2.1 .8 P.01d P. 16a A. 4.4.2.5 T. 14a

AN ENERGI

Harga Satuan 5 246,337.74 273,043.03 1,109,582.85 202,998.85

AN ENERGI

Harga Satuan 5 -

AN ENERGI

Harga Satuan 5 Rp Rp Rp

41,975.82 6,578.97 188,474.96

Rp Rp Rp Rp Rp

406,672.54 1,070,899.20 5,359.03 40,270.49 22,746.90

AN ENERGI

Harga Satuan

5 -

-

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

TEMPAT PEKERJAAN 1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten

: : Batursari : Mranggen : Demak

Harga Perkiraan Sendiri (HPS) Untuk :

Pengerasan Jalan Dukuh Daleman Ke Dukuh Gebangsa Batursari Kecamatan Mranggen

Kegiatan APBD Perubahan Kabupaten Demak Tahun Anggar

No

Uraian Pekerjaan

Volume

Analis

Harga Satuan ( Rp. )

Jumlah Harga ( Rp. )

1

2

3

4

5

6

I

II

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan PEK. PENGERASAN JALAN Volume Pemadatan = 179 m x 4,00 m x 0,25 m 1 Pek. Leveling Sirtu

1.00 Ls 1.00 Ls 1.00 Ls

Taksir Taksir Taksir

500,000.00 600,000.00 250,000.00

500,000.00 600,000.00 250,000.00

179.13 m3

Dihit

246,266.28

44,114,285.31

Jumlah PPN 10 % Jumlah Total Dibulatkan

Terbilang :

: : : :

(Lima Puluh Juta Rupiah)

Demak,

2015

KASI PERTAMANAN DAN PEMAKAMAN PADA BIDANG KEBERSIHAN DAN PJU DPU PPE KABUPATEN DEMAK SELAKU PEJABAT PEMBUAT KOMITMEN

ANDI ERWIN PRASETYO, ST NIP. 19720914 200312 1 002

KOP PERUSAHAAN BILL OF QUANTITY (BQ)

TEMPAT PEKERJAAN 1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten

: : Batursari : Mranggen : Demak

Harga Perkiraan Sendiri (HPS) Untuk :

Pengerasan Jalan Dukuh Daleman Ke Dukuh Gebangsa Batursari Kecamatan Mranggen

Kegiatan APBD Perubahan Kabupaten Demak Tahun Anggar

No

Uraian Pekerjaan

Volume

Analis

Harga Satuan ( Rp. )

Jumlah Harga ( Rp. )

1

2

3

4

5

6

I

II

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan PEK. PENGERASAN JALAN Volume Pemadatan = 179 m x 4,00 m x 0,25 m 1 Pek. Leveling Sirtu

1.00 Ls 1.00 Ls 1.00 Ls

Taksir Taksir Taksir

179.13 m3

Dihit

-

-

Jumlah PPN 10 % Jumlah Total Dibulatkan

Terbilang :

-

: : : :

( .......................................................... )

Demak,

2015

dibuat oleh PT. / CV ………………………………

…………………………….. DIREKTUR

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

TEMPAT PEKERJAAN 1. Kelurahan/Desa 2. Kecamatan 3. Kabupaten

: : Batursari : Mranggen : Demak

Harga Perkiraan Sendiri (HPS) Untuk :

Pengerasan Jalan Dukuh Daleman Ke Dukuh Gebangsa Batursari Kecamatan Mranggen

Kegiatan APBD Perubahan Kabupaten Demak Tahun Anggar

No

Uraian Pekerjaan

Volume

Analis

Harga Satuan ( Rp. )

Jumlah Harga ( Rp. )

1

2

3

4

5

6

I

II

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan PEK. PENGERASAN JALAN Volume Pemadatan = 179 m x 4,00 m x 0,25 m 1 Pek. Leveling Padas

1.00 Ls 1.00 Ls 1.00 Ls

Taksir Taksir Taksir

500,000.00 600,000.00 250,000.00

500,000.00 600,000.00 250,000.00

250.18 m3

Dihit

176,296.68

44,105,022.98

Jumlah PPN 10 % Jumlah Total

: : :

Dibulatkan

Terbilang :

:

(Lima Puluh Juta Rupiah)

Demak,

2015

KASI PERTAMANAN DAN PEMAKAMAN PADA BIDANG KEBERSIHAN DAN PJU DPU PPE KABUPATEN DEMAK SELAKU PEJABAT PEMBUAT KOMITMEN

ANDI ERWIN PRASETYO, ST NIP. 19720914 200312 1 002

PERHITUNGAN VOLUME PEKERJAAN PENGERASAN JALAN : Pengerasan Jalan Dukuh Daleman Ke Dukuh Gebangsari Desa Batursari Kecamatan Mranggen Uk. 0,15 m' x 3,00 m'

N ENERGI

Dukuh Gebangsari Desa

emak Tahun Anggaran 2015

Harga Total ( Rp. ) 7

1,350,000.00

44,114,285.31 45,464,285.31 4,546,428.53 50,010,713.84 50,010,000.00

2015

AN DAN PEMAKAMAN EBERSIHAN DAN PJU BUPATEN DEMAK

MBUAT KOMITMEN

PRASETYO, ST 14 200312 1 002

No

Uraian Pekerjaan 1 Pek. Leveling Sirtu

t

l 0.25

p 4.00

q 179.00

h

PERHITUNGAN VOLUME PEKERJAAN JALAN BETON : Pengerasan Jalan Dukuh Daleman Ke Dukuh Gebangsari Desa Batursari Kecamatan Mranggen Uk. 0,15 m' x 3,00 m'

Dukuh Gebangsari Desa

No

emak Tahun Anggaran 2015

Harga Total ( Rp. ) 7

-

-

2015

………………………..

………………..

Uraian Pekerjaan 1 Pek. Leveling Sirtu

t

l 0.25

p 4.00

q 179.00

h

PERHITUNGAN VOLUME PEKERJAAN PENGERASAN JALAN : Pengerasan Jalan Dukuh Daleman Ke Dukuh Gebangsari Desa Batursari Kecamatan Mranggen Uk. 0,15 m' x 3,00 m'

N ENERGI

Dukuh Gebangsari Desa

emak Tahun Anggaran 2015

Harga Total ( Rp. ) 7

1,350,000.00

44,105,022.98 45,455,022.98 4,545,502.30 50,000,525.28

No

Uraian Pekerjaan Pek. Leveling Sirtu 1

t

l 0.25

p 4.00

q 250.00

h

50,000,000.00

2015

AN DAN PEMAKAMAN EBERSIHAN DAN PJU BUPATEN DEMAK

MBUAT KOMITMEN

PRASETYO, ST 14 200312 1 002

Volume 179.13

Sat

Keterangan v = t*l*p

Volume 179.13

Sat

Keterangan v = t*l*p

Volume 250.18

Sat

Keterangan v = t*l*p

Pekerjaan Timbunan SIRTU (Per m3) Nomor

Uraian

Kode

Satuan

Koefisien

A. 1 2

TENAGA Pekerja Mandor

L01 L04

Jam Jam

B. 1

BAHAN Bahan timbunan ( SIRTU )

M08

m3

C. 1 2 3 4 5 6

PERALATAN Excavator Dump Truck Motor Grader Vibro Roller Water Tank Truck Alat Bantu

D. E. F.

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E )

E15 E08 E13 E19 E23

Harga Satuan (Rp) Jumlah Harga (Rp)

0.0435 0.0109

57,400.00 85,800.00

2,496.90 935.22 3,432.12

1.2000 166,600.00 JUMLAH HARGA BAHAN

199,920.00 199,920.00

Jam 0.0109 Jam 0.5143 Jam 0.0037 Jam 0.0042 Jam 0.0070 Ls 0.2000 JUMLAH HARGA PERALATAN

219,677.34

922.64

68,300.00

13,660.00 14,582.64 217,934.76 28,331.52 246,266.28

Pekerjaan Timbunan SIRTU (Per m3) Nomor

Uraian

Kode

Satuan

Koefisien

A. 1 2

TENAGA Pekerja Mandor

L01 L04

Jam Jam

B. 1

BAHAN Bahan timbunan ( SIRTU )

M08

m3

C. 1 2 3 4 5 6

PERALATAN Excavator Dump Truck Motor Grader Vibro Roller Water Tank Truck Alat Bantu

D. E. F.

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E )

E15 E08 E13 E19 E23

Harga Satuan (Rp) Jumlah Harga (Rp)

0.0435 0.0109

1.2000 JUMLAH HARGA BAHAN

Jam 0.0109 Jam 0.5143 Jam 0.0037 Jam 0.0042 Jam 0.0070 Ls 0.2000 JUMLAH HARGA PERALATAN

-

-

-

-

-

-

-

-

Pekerjaan Timbunan Padas (Per m3) Nomor

Uraian

Kode

Satuan

Koefisien

A. 1 2

TENAGA Pekerja Mandor

L01 L04

Jam Jam

B. 1

BAHAN Bahan timbunan ( Padas )

M08

m3

C. 1 2 3 4 5 6

PERALATAN Excavator Dump Truck Motor Grader Vibro Roller Water Tank Truck Alat Bantu

D. E. F.

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E )

E15 E08 E13 E19 E23

Harga Satuan (Rp) Jumlah Harga (Rp)

0.0435 0.0109

57,400.00 85,800.00

2,496.90 935.22 3,432.12

1.2000 115,000.00 JUMLAH HARGA BAHAN

138,000.00 138,000.00

Jam 0.0109 Jam 0.5143 Jam 0.0037 Jam 0.0042 Jam 0.0070 Ls 0.2000 JUMLAH HARGA PERALATAN

219,677.34

922.64

68,300.00

13,660.00 14,582.64 156,014.76 20,281.92 176,296.68

Pekerjaan Timbunan Padas (Per m3) Nomor

Uraian

Kode

Satuan

Koefisien

A. 1 2

TENAGA Pekerja Mandor

L01 L04

Jam Jam

B. 1

BAHAN Bahan timbunan ( Padas )

M08

m3

C. 1 2 3 4 5 6

PERALATAN Excavator Dump Truck Motor Grader Vibro Roller Water Tank Truck Alat Bantu

D. E. F.

Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) Overhead & profit, contoh 13% x D Harga satuan pekerjaan ( D + E )

E15 E08 E13 E19 E23

Harga Satuan (Rp) Jumlah Harga (Rp)

0.0435 0.0109

1.2000 JUMLAH HARGA BAHAN

Jam 0.0109 Jam 0.5143 Jam 0.0037 Jam 0.0042 Jam 0.0070 Ls 0.2000 JUMLAH HARGA PERALATAN

-

-

-

-

-

-

-

-

PEMERINTAH KABUPATEN DEMAK DINAS PEKERJAAN UMUM, PERUMAHAN, PERTAMBANGAN DAN ENERGI Jalan Kyai Jebat No. 35 Telpon ( 0291 ) 685123 Demak

TEMPAT PEKERJAAN

:

1. Kelurahan/Desa

: Jamus

2. Kecamatan

: Mranggen

3. Kabupaten

: Demak

Harga Perkiraan Sendiri (HPS) Untuk :

Pembangunan Talud Jamus Grejan RT. 5/02 Ds. Jamus Kec. Mran Kegiatan APBD Perubahan Kabupaten Demak Tahun 2015

No

Uraian Pekerjaan

Volume

Analis

Harga Satuan ( Rp. )

Jumlah Harga ( Rp. )

1

2

3

4

5

6

I.

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan

II.

1.00 Ls 1.00 Ls 1.00 Ls

Taksir Taksir Taksir

550,000.00 650,000.00 250,000.00

550,000.00 650,000.00 250,000.00

46.44 m3

T.06a

135.80 m1 3.61 m3

P.07b T.14c

41,975.82 6,578.97 188,474.96

1,949,356.90 893,424.53

4 Pek. Pasang Batu Belah 1pc : 5 Ps

76.91 m3

P.01d

82,357,502.93

5 Pek. Pasang Bambu Peresapan Air 6 Pek. Plesteran + Acian

67.90 m1 71.12 m2

P.16a P.04c

7 Pek. Urugan tanah Kembali

15.48 m3

T.14a

1,070,899.20 5,359.03 40,270.49 22,746.90

PEK. KONSTRUKSI TALUD Volume A ; tinggi = 0.50 ; Panjang Talud = 82,80 m' Volume B ; tinggi = 1,50 m ; Panjang Talud = 24,50 m' Volume C ; tinggi = 2,00 ; Panjang Talud = 28,50 m'

1 Pek. Galian Tanah 2 Pek. Pasang Trucuk Bambu t = 1 m' 3 Pek. Urugan Pasir Dasar

679,584.16 363,877.80 2,863,996.84 352,122.01 Jumlah total Rp. PPN 10% Rp. Jumlah total Rp. Dibulatkan Rp.

Terbilang : (Seratus Juta Rupiah)

Demak,

2015

KASI PERTAMANAN DAN PEMAKAMAN

PADA BIDANG KEBERSIHAN DAN PJU DPU PPE KABUPATEN DEMAK SELAKU PEJABAT PEMBUAT KOMITMEN

ANDI ERWIN PRASETYO, ST NIP. 19720914 200312 1 002

KOP PERUSAHAAN BILL OF QUANTITY (BQ) TEMPAT PEKERJAAN

:

Harga Perkiraan Sendiri (HPS) Untuk :

1. Kelurahan/Desa

: Jamus

2. Kecamatan

: Mranggen

3. Kabupaten

: Demak

Pembangunan Talud Jamus Grejan RT. 5/02 Ds. Jamus Kec. Mran Kegiatan APBD Perubahan Kabupaten Demak Tahun 2015

No

Uraian Pekerjaan

Volume

Analis

Harga Satuan ( Rp. )

Jumlah Harga ( Rp. )

1

2

3

4

5

6

I.

PEKERJAAN PERSIAPAN 1 Pengukuran dan Pembersihan Lapangan 2 Administrasi dan Dokumentasi 3 Papan Nama Kegiatan

II.

1.00 Ls 1.00 Ls 1.00 Ls

Taksir Taksir Taksir

-

-

46.44 m3

T.06a

135.80 m1 3.61 m3

P.07b T.14c

-

-

4 Pek. Pasang Batu Belah 1pc : 5 Ps

76.91 m3

P.01d

-

5 Pek. Pasang Bambu Peresapan Air 6 Pek. Plesteran + Acian

67.90 m1 71.12 m2

P.16a P.04c

7 Pek. Urugan tanah Kembali

15.48 m3

T.14a

-

PEK. KONSTRUKSI TALUD Volume A ; tinggi = 0.50 ; Panjang Talud = 82,80 m' Volume B ; tinggi = 1,50 m ; Panjang Talud = 24,50 m' Volume C ; tinggi = 2,00 ; Panjang Talud = 28,50 m'

1 Pek. Galian Tanah 2 Pek. Pasang Trucuk Bambu t = 1 m' 3 Pek. Urugan Pasir Dasar

Jumlah total Rp. PPN 10% Rp. Jumlah total Rp. Dibulatkan Rp.

Terbilang :

( ............................................................ )

Demak,

2015

dibuat oleh PT. / CV …………………………………..

…………………………….. DIREKTUR

PERHITUNGAN VOLUME PEKERJAAN TALUD Pembangunan Talud Jamus Grejan RT. 5/02 Ds. Jamus Kec. Mranggen Uk. Panjang = 82,80 m' ; tinggi = 0,50 m'

ENERGI

Talud Type A No

5/02 Ds. Jamus Kec. Mranggen

emak Tahun 2015

Harga Total ( Rp. ) 7

Uk.

Uraian

panjang

lebar

tbl/tggi

n

1 Pek. Galian Tanah

82.80

0.60

0.50

2 Pek. Pasang Trucuk Bambu t = 1 m'

82.80

1.00

3 Pek. Urugan Pasir Dasar

82.80

0.50

0.05

4 Pek. Pasang Batu Belah 1pc : 5 Ps

82.80

0.45

0.50

5 Pek. Pasang Bambu Peresapan Air

82.80

0.50

6 Pek. Plesteran + Acian

82.80

0.53

7 Pek. Urugan tanah Kembali

82.80

3

Panjang = 24,50 m' ; tinggi = 1,50 m'

1,450,000.00

Talud Type B No

Uk.

Uraian

panjang

lebar

tbl/tggi

n

1 Pek. Galian Tanah

24.50

0.60

0.50

2 Pek. Pasang Trucuk Bambu t = 1 m'

24.50

1.00

3 Pek. Urugan Pasir Dasar

24.50

0.60

0.04

4 Pek. Pasang Batu Belah 1pc : 5 Ps

24.50

0.50

1.50

5 Pek. Pasang Bambu Peresapan Air

24.50

0.50

6 Pek. Plesteran + Acian

24.50

0.53

7 Pek. Urugan tanah Kembali

24.50

3

Panjang = 28.50 m' ; tinggi = 2,00 m' Talud Type C

89,459,865.18 90,909,865.18 9,090,986.52 100,000,851.70 100,000,000.00

2015

AN DAN PEMAKAMAN

EBERSIHAN DAN PJU

BUPATEN DEMAK

MBUAT KOMITMEN

PRASETYO, ST 14 200312 1 002

No

Uraian

panjang

lebar

tbl/tggi

n

1 Pek. Galian Tanah

28.50

1.00

0.5

2 Pek. Pasang Trucuk Bambu t = 1 m'

28.50

1.00

3 Pek. Urugan Pasir Dasar

28.50

1.00

0.04

4 Pek. Pasang Batu Belah 1pc : 5 Ps

28.50

0.70

2.00

5 Pek. Pasang Bambu Peresapan Air

28.50

0.50

6 Pek. Plesteran + Acian

28.50

0.53

7 Pek. Urugan tanah Kembali

28.50

3

PERHITUNGAN VOLUME PEKERJAAN TALUD Pembangunan Talud Jamus Grejan RT. 5/02 Ds. Jamus Kec. Mranggen Uk. Panjang = 82,80 m' ; tinggi = 0,50 m' Talud Type A No

5/02 Ds. Jamus Kec. Mranggen

emak Tahun 2015

Harga Total ( Rp. ) 7

Uk.

Uraian

panjang

lebar

tbl/tggi

n

1 Pek. Galian Tanah

82.80

0.60

0.50

2 Pek. Pasang Trucuk Bambu t = 1 m'

82.80

1.00

3 Pek. Urugan Pasir Dasar

82.80

0.50

0.05

4 Pek. Pasang Batu Belah 1pc : 5 Ps

82.80

0.45

0.50

5 Pek. Pasang Bambu Peresapan Air

82.80

0.50

6 Pek. Plesteran + Acian

82.80

0.53

7 Pek. Urugan tanah Kembali

82.80

3

Panjang = 24,50 m' ; tinggi = 1,50 m'

-

Talud Type B No

Uk.

Uraian

panjang

lebar

tbl/tggi

n

1 Pek. Galian Tanah

24.50

0.60

0.50

2 Pek. Pasang Trucuk Bambu t = 1 m'

24.50

1.00

3 Pek. Urugan Pasir Dasar

24.50

0.60

0.04

4 Pek. Pasang Batu Belah 1pc : 5 Ps

24.50

0.50

1.50

5 Pek. Pasang Bambu Peresapan Air

24.50

0.50

6 Pek. Plesteran + Acian

24.50

0.53

7 Pek. Urugan tanah Kembali

24.50

3

Panjang = 28.50 m' ; tinggi = 2,00 m' Talud Type C

-

2015

No

Uraian

panjang

lebar

tbl/tggi

n

1 Pek. Galian Tanah

28.50

1.00

0.5

2 Pek. Pasang Trucuk Bambu t = 1 m'

28.50

1.00

3 Pek. Urugan Pasir Dasar

28.50

1.00

0.04

4 Pek. Pasang Batu Belah 1pc : 5 Ps

28.50

0.70

2.00

5 Pek. Pasang Bambu Peresapan Air

28.50

0.50

6 Pek. Plesteran + Acian

28.50

0.53

7 Pek. Urugan tanah Kembali

28.50

3

…………………………..

…………………..

v gln

ket

vol 24.84 v =p*l*t 82.80 v =p*l 1.86 v = p*l*t 18.63 v =p*l*t 41.40 v =p*l 43.88 v =p*l

0.30

v gln

8.28 v =p*vol. galian/n

ket

vol 7.35 v =p*l*t 24.50 v =p*l 0.60 v = p*l*t 18.38 v =p*l*t 12.25 v =p*l 12.99 v =p*l 0.3

v gln

2.45 v =p*vol. galian/n

ket

vol 14.25 v =p*l*t 28.50 v =p*l 1.14 v = p*l*t 39.90 v =p*l 14.25 v =p*l

15.11 v =p*vol. galian/n 0.5

4.75

v gln

ket

vol 24.84 v =p*l*t 82.80 v =p*l 1.86 v = p*l*t 18.63 v =p*l*t 41.40 v =p*l 43.88 v =p*l

0.30

v gln

8.28 v =p*vol. galian/n

ket

vol 7.35 v =p*l*t 24.50 v =p*l 0.60 v = p*l*t 18.38 v =p*l*t 12.25 v =p*l 12.99 v =p*l 0.3

v gln

2.45 v =p*vol. galian/n

ket

vol 14.25 v =p*l*t 28.50 v =p*l 1.14 v = p*l*t 39.90 v =p*l 14.25 v =p*l

15.11 v =p*vol. galian/n 0.5

4.75

T.06a No A

1.00 m3 galian tanah biasa sedalam < 1 m Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan OH OH

Koefisien

Harga Satuan

0.5630 Rp 0.0563 Rp

Jumlah harga

57,400.00 Rp 85,800.00 Rp

32,316.20 4,830.54

Jumlah Harga Tenaga Kerja B

Bahan

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Jumlah Harga Bahan Jumlah Harga Peralatan

P.07b No A

B

13 X D

1 m panjang cerucuk bambu diameter 8 cm - 10 cm Uraian Tenaga Pekerja Mandor Operator Tripod *)

Kode

Satuan OH OH OH

Bahan bambu dia. 8 cm -10 cm

m'

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Koefisien

Harga Hatuan

Jumlah harga

0.036 Rp 57,400.00 Rp 2,066.40 0.004 Rp 85,800.00 Rp 343.20 0.006 Rp - Rp Jumlah Harga Tenaga Kerja 1.05 Rp 3,250.00 Rp Jumlah Harga Bahan

3,412.50

Jumlah Harga Peralatan

T.14c No A

B

13 X D

1 m3 Timbunan pasir sebagai bahan pengisi (1 m3) Uraian

Kode

Tenaga Pekerja Mandor

L.01 L.04

Bahan pasir Urug

M.14.b

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Satuan OH OH

Koefisien

Harga Satuan

Jumlah harga

0.4000 Rp 57,400.00 Rp 22,960.00 0.0400 Rp 85,800.00 Rp 3,432.00 Jumlah Harga Tenaga Kerja

1.2 Rp 117,000.00 Rp Jumlah Harga Bahan

140,400.00

Jumlah Harga Peralatan

13 X D

A.3.2.1.8 1 m3 batu kosong (anstamping) No A

Uraian Tenaga Pekerja Tukang Batu

Kode L.01 L.02

Satuan OH OH

Koefisien

Harga Hatuan

0.7800 Rp 0.3900 Rp

Jumlah harga

57,400.00 Rp 70,000.00 Rp

44,772.00 27,300.00

Kepala Tukang Mandor B

L.03 L.04

Bahan Batu Belah Pasir urug

OH OH

0.0390 Rp 75,000.00 Rp 2,925.00 0.0390 Rp 85,800.00 Rp 3,346.20 Jumlah Harga Tenaga Kerja 1.200 Rp 0.432 Rp

m3 m3

192,500.00 Rp 117,000.00 Rp

231,000.00 50,544.00

Jumlah Harga Bahan C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Jumlah Harga Peralatan

P.01d No A

B

C

13 X D

1 m3 Pasangan Batu Campuran 1 PC : 5 PS Uraian

Kode

Tenaga Pekerja Tukang Kepala Tukang Mandor

OH OH OH OH

Bahan Batu Belah 15/20 Pasir Beton Semen

m3 m3 kg

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

No A

B

Koefisien 2.7000 0.9000 0.0900 0.2700

Peralatan Molen (sewa-hari

D

P. 16.a

Satuan

Harga Satuan

Jumlah harga

Rp 57,400.00 Rp Rp 70,000.00 Rp Rp 75,000.00 Rp Rp 85,800.00 Rp Jumlah Harga Tenaga Kerja

154,980.00 63,000.00 6,750.00 23,166.00

1.200 Rp 251,300.00 Rp 0.544 Rp 352,500.00 Rp 135 Rp 1,438.00 Rp Jumlah Harga Bahan

301,560.00 191,760.00 194,130.00

0.167 Rp 73,966.51 Rp Jumlah Harga Peralatan

12,352.41

13 X D

Pasangan pipa suling-suling 1 m' Uraian

Kode

Satuan

Tenaga Pekerja Mandor

OH OH

Bahan Bambu

m

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Koefisien

Harga Hatuan

Jumlah harga

0.01 Rp 53,000.00 Rp 530.00 0.01 Rp 80,000.00 Rp 800.00 Jumlah Harga Tenaga Kerja 1.050 Rp 3,250.00 Rp Jumlah Harga Bahan Jumlah Harga Peralatan

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm

13 X D

3,412.50

No A

B

Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Kode

Satuan OH OH OH OH

Bahan Pasir beton Semen

m3 kg

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m2 (D+E)

Koefisien 0.300 0.150 0.015 0.015

Harga Hatuan

Jumlah harga

Rp 53,000.00 Rp 15,900.00 Rp 70,000.00 Rp 10,500.00 Rp 72,000.00 Rp 1,080.00 Rp 80,000.00 Rp 1,200.00 Jumlah Harga Tenaga Kerja

0.026 Rp 267,600.00 Rp 5.184 Rp - Rp Jumlah Harga Bahan

6,957.60 -

Jumlah Harga Peralatan

T.14a No A

13 X D

1 m3 urugan tanah kembali (1 m3) Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan OH OH

Koefisien

Harga Hatuan

0.3300 Rp 0.0330 Rp

Jumlah harga

53,000.00 Rp 80,000.00 Rp

17,490.00 2,640.00

Jumlah Harga Tenaga Kerja B

Bahan

C

Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

Jumlah Harga Bahan Jumlah Harga Peralatan

13 X D

T.06a No

1.00 m3 galian tanah biasa sedalam < 1 m Uraian

Kode

Satuan

Koefisien

Harga Satuan

Jumlah harga

A

Tenaga Pekerja Mandor

L.01 L.04

OH OH

0.5630 0.0563

-

-

Jumlah Harga Tenaga Kerja B

Bahan Jumlah Harga Bahan

C

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

P.07b No A

B

C

13 X D

1 m panjang cerucuk bambu diameter 8 cm - 10 cm Uraian

Kode

Satuan

Koefisien

Tenaga Pekerja Mandor Operator Tripod *)

OH OH OH

0.036 0.004 0.006

Bahan bambu dia. 8 cm -10 cm

m'

1.05

Harga Hatuan

Jumlah harga

Jumlah Harga Tenaga Kerja

-

Jumlah Harga Bahan

-

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

T.14c No A

B

C

13 X D

1 m3 Timbunan pasir sebagai bahan pengisi (1 m3) Uraian

Kode

Tenaga Pekerja Mandor

L.01 L.04

Bahan pasir Urug

M.14.b

Satuan OH OH

Koefisien 0.4000 0.0400

1.2

Harga Satuan

Jumlah harga

Jumlah Harga Tenaga Kerja

-

Jumlah Harga Bahan

-

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

13 X D

A.3.2.1.8 1 m3 batu kosong (anstamping) No A

Uraian Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

Kode L.01 L.02 L.03 L.04

Satuan OH OH OH OH

Koefisien 0.7800 0.3900 0.0390 0.0390

Harga Hatuan

Jumlah harga

Jumlah Harga Tenaga Kerja

-

B

Bahan Batu Belah Pasir urug

1.200 0.432

m3 m3

-

-

Jumlah Harga Bahan C

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

P.01d No A

B

C

13 X D

1 m3 Pasangan Batu Campuran 1 PC : 5 PS Uraian Tenaga Pekerja Tukang Kepala Tukang Mandor

Kode

Bahan Batu Belah 15/20 Pasir Beton Semen Peralatan Molen (sewa-hari

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B

C

2.7000 0.9000 0.0900 0.2700

m3 m3 kg

Jumlah A+B+C

No A

Koefisien

OH OH OH OH

D

P. 16.a

Satuan

Harga Satuan

Jumlah harga

Jumlah Harga Tenaga Kerja

-

1.200 0.544 135

Jumlah Harga Bahan

-

0.167

Jumlah Harga Peralatan

-

13 X D

Pasangan pipa suling-suling 1 m' Uraian

Kode

Satuan

Koefisien

Harga Hatuan

Jumlah harga

Tenaga Pekerja Mandor

OH OH

0.01 0.01

Jumlah Harga Tenaga Kerja

-

Bahan Bambu

m

1.050

Jumlah Harga Bahan

-

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

13 X D

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm No A

Uraian Tenaga Pekerja

Kode

Satuan OH

Koefisien 0.300

Harga Hatuan

Jumlah harga -

-

B

C

Tukang Kepala Tukang Mandor

OH OH OH

Bahan Pasir beton Semen

m3 kg

0.150 0.015 0.015

0.026 5.184

Jumlah Harga Tenaga Kerja

-

Jumlah Harga Bahan

-

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m2 (D+E)

T.14a No A

13 X D

1 m3 urugan tanah kembali (1 m3) Uraian Tenaga Pekerja Mandor

Kode L.01 L.04

Satuan OH OH

Koefisien

Harga Hatuan

0.3300 0.0330

Jumlah harga -

Jumlah Harga Tenaga Kerja B

Bahan Jumlah Harga Bahan

C

Peralatan Jumlah Harga Peralatan

D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

13 X D

-

Jumlah Total

Rp

37,146.74

Rp

37,146.74

Rp

4,829.08

Rp

41,975.82

Jumlah Total

Rp

2,409.60

Rp

3,412.50

Rp Rp

5,822.10

Rp

756.87

Rp

6,578.97

gal tnh

trucuk bmbu

PSR URUG Jumlah Total

Rp

26,392.00

Rp

140,400.00

Rp Rp

166,792.00

Rp

21,682.96

Rp

188,474.96

Jumlah Total

bt ksong

Rp

78,343.20

Rp

281,544.00

Rp Rp

359,887.20

Rp

46,785.34

Rp

406,672.54

Jumlah Total

Rp

247,896.00

Rp

687,450.00

Rp Rp

12,352.41 947,698.41

Rp

123,200.79

Rp

1,070,899.20

Jumlah Total

Rp

1,330.00

Rp

3,412.50

Rp Rp

4,742.50

Rp

616.53

Rp

5,359.03

pas bt blh

resapan

Plesteran

Jumlah Total

Rp

28,680.00

Rp

6,957.60

Rp

35,637.60

Rp

4,632.89

Rp

40,270.49

urkembali Jumlah Total

Rp

20,130.00

Rp

20,130.00

Rp

2,616.90

Rp

22,746.90

Jumlah Total

-

-

Jumlah Total

-

-

Jumlah Total

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

Jumlah Total

-

-

-

Jumlah Total

-

-

b) molen No

A

K. 175 Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor

Kode

Satuan Koefisien Harga Hatuan

L.01

OH

L.02

OH

L.03

OH

L.04

OH

1.323 0.189 0.019 0.132

Rp Rp Rp Rp

57,400.00 70,000.00 75,000.00 85,800.00

Jumlah harga Rp Rp Rp Rp

75,940.20 13,230.00 1,425.00 11,325.60

Jumlah Harga Tenaga Kerja B

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

326 760 1029 215

Rp Rp Rp Rp

1,438.00 251.79 152.83 50.00

Rp Rp Rp Rp

468,788.00 191,357.14 157,265.50 10,750.00

Jumlah Harga Bahan C

Peralatan Molen

E.28.b

sewa hari

0.250 Rp

73,966.51 Rp

18,491.63

Jumlah Harga Peralatan D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

b) molen

K. 225

No

A

Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor

Kode

13 X D

Satuan Koefisien Harga Hatuan

L.01

OH

L.02

OH

L.03

OH

L.04

OH

1.323 0.189 0.019 0.132

Rp Rp Rp Rp

57,400.00 70,000.00 75,000.00 85,800.00

Jumlah harga Rp Rp Rp Rp

75,940.20 13,230.00 1,425.00 11,325.60

Jumlah Harga Tenaga Kerja B

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

371 698 1047 215

Rp Rp Rp Rp

1,438.00 251.79 152.83 50.00

Rp Rp Rp Rp

533,498.00 175,746.43 160,016.50 10,750.00

Jumlah Harga Bahan C

Peralatan Molen

E.28.b

sewa hari

0.250 Rp

73,966.51 Rp

18,491.63

Jumlah Harga Peralatan D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

13 X D

K. 300

b) molen No

A

Uraian Tenaga Pekerja Tukang batu Kepala Tukang Mandor

Kode

Satuan Koefisien Harga Hatuan

L.01

OH

L.02

OH

L.03

OH

L.04

OH

1.323 0.189 0.019 0.132

Rp Rp Rp Rp

57,400.00 70,000.00 75,000.00 85,800.00

Jumlah harga Rp Rp Rp Rp

75,940.20 13,230.00 1,425.00 11,325.60

Jumlah Harga Tenaga Kerja

B

Bahan Semen Pasir beton/PB Krikil/Kr Air

M.15 M.14.a M.12 M.02

kg kg kg L

413 681 1021 215

Rp Rp Rp Rp

1,438.00 251.79 152.83 50.00

Rp Rp Rp Rp

593,894.00 171,466.07 156,042.83 10,750.00

Jumlah Harga Bahan C

Peralatan Molen

E.28.b

sewa hari

0.250 Rp

73,966.51 Rp

18,491.63

Jumlah Harga Peralatan D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.13 B.13.a

1 m3 beton menggunakan ready mixed dan bahan aditif 1 m3 beton menggunakan ready mixed dan pompa beton Uraian Kode Satuan Koefisien Harga Hatuan

No

A

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

13 X D

L.01

OH

L.02

OH

L.03

OH

L.04

OH

1.000 0.250 0.025 0.100

Rp Rp Rp Rp

(K. 175) Jumlah harga

57,400.00 70,000.00 75,000.00 85,800.00

Rp Rp Rp Rp

57,400.00 17,500.00 1,875.00 8,580.00

Jumlah Harga Tenaga Kerja B

Bahan campuran beton ready mixed

M.09.x

m3

1.02 Rp

948,573.07 Rp

967,544.53

Jumlah Harga Bahan C

Peralatan pompa & conveyor beton

E.35

sewa hari

0.12 Rp

-

Rp

-

Jumlah Harga Peralatan D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.13 B.13.a

1 m3 beton menggunakan ready mixed dan bahan aditif 1 m3 beton menggunakan ready mixed dan pompa beton Uraian Kode Satuan Koefisien Harga Hatuan

No

A

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

13 X D

L.01

OH

L.02

OH

L.03

OH

L.04

OH

1.000 0.250 0.025 0.100

Rp Rp Rp Rp

(K. 225) Jumlah harga

57,400.00 70,000.00 75,000.00 85,800.00

Rp Rp Rp Rp

57,400.00 17,500.00 1,875.00 8,580.00

Jumlah Harga Tenaga Kerja B

Bahan campuran beton ready mixed

M.09.x

m3

1.02 Rp 1,000,423.36 Rp 1,020,431.82

Jumlah Harga Bahan C

Peralatan pompa & conveyor beton

E.35

sewa hari

0.12 Rp

-

Rp

Jumlah Harga Peralatan D

Jumlah A+B+C

-

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

B.13 B.13.a

1 m3 beton menggunakan ready mixed dan bahan aditif 1 m3 beton menggunakan ready mixed dan pompa beton Uraian Kode Satuan Koefisien Harga Hatuan

No

A

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

13 X D

L.01

OH

L.02

OH

L.03

OH

L.04

OH

1.000 0.250 0.025 0.100

Rp Rp Rp Rp

(K. 300) Jumlah harga

57,400.00 70,000.00 75,000.00 85,800.00

Rp Rp Rp Rp

57,400.00 17,500.00 1,875.00 8,580.00

Jumlah Harga Tenaga Kerja B

Bahan campuran beton ready mixed

M.09.x

m3

1.02 Rp 1,052,565.33 Rp 1,073,616.64

Jumlah Harga Bahan C

Peralatan pompa & conveyor beton

E.35

sewa hari

0.12 Rp

-

Rp

Jumlah Harga Peralatan D

Jumlah A+B+C

E

Overheat + Profit ( 13 %)

F

Harga Satuan Pekerjaan per-m3 (D+E)

13 X D

-

Jumlah Total

Rp

101,920.80

Rp

828,160.64

Rp Rp

18,491.63 948,573.07

Rp

123,314.50

Rp 1,071,887.57

Jumlah Total

Rp

101,920.80

Rp

880,010.93

Rp Rp

18,491.63 1,000,423.36

Rp

130,055.04

Rp 1,130,478.39

Jumlah Total

Rp

101,920.80

Rp

932,152.90

Rp Rp

18,491.63 1,052,565.33

Rp

136,833.49

Rp 1,189,398.82

Jumlah Total

Rp

85,355.00

Rp

967,544.53

Rp Rp

1,052,899.53

Rp

136,876.94

Rp 1,189,776.47

Jumlah Total

Rp

85,355.00

Rp

1,020,431.82

Rp Rp

1,105,786.82

Rp

143,752.29

Rp 1,249,539.11

Jumlah Total

Rp

85,355.00

Rp

1,073,616.64

Rp Rp

1,158,971.64

Rp

150,666.31

Rp 1,309,637.95

Related Documents

Geopro Hitungan
May 2020 14
Hitungan Cawan.docx
November 2019 20
Hitungan Jembatan.xlsx
November 2019 18
Hitungan Ratio
November 2019 14
Sample Hitungan Rab
November 2019 4
Hitungan Konka 1.xlsx
May 2020 17

More Documents from "amanul ihsan"

Hitungan Jembatan.xlsx
November 2019 18
Topik_8
April 2020 15
Hongkong
November 2019 38