DAFTAR HARGA SATUAN BAHAN BANGUNAN SAMPLE NO
JENIS BAHAN BANGUNAN 1 2 1 Semen PPC (Gresik)
SATUAN 3 /zak 3
2 Pasir pasang
/m 3
3 Pasir urug
/m 3
4 Tanah urug 5 Kapur 6 Mill
/m /zak /zak 3
7 Batu kali 8 Batu bata 9 Besi beton Polos U.24 (SNI) 10 Besi beton Ulir U.39 (SNI)
/m /bh /kg /kg 3
11 Batu split 2-3 cm (pecah manual) /m 3
12 Batu split 3-4 cm (pecah manual) /m 3
13 Koral 3-4 cm /m 14 Bendrat /kg 15 Taek wood 3 mm (90 x 210) cm /lembar Papan sengon (Bekesting) 2/20 x 200 16 cm /lembar 17 Bambu /batang 18 Dolken /batang 19 Minyak bekesting /liter 20 Paku (rata-rata) /kg 21 Paku Plepet /kg 22 Paku Zeng /bh 23 Lem Kayu /kg 3
24 Balok kayu Meranti
/m 3
25 Papan kayu Meranti
/m
3
26 Balok kayu Jati kelas Politur
/m 3
27 Papan kayu Jati kelas Politur
/m 3
28 Balok kayu Bengkirai
/m 3
29 Papan kayu Bengkirai
/m 3
30 Balok kayu Kamper
/m 3
31 Papan kayu Kamper
/m 3
32 Balok kayu Kruing
/m 3
33 Papan kayu Kruing 34 Genteng Beton eks Mutiara 35 Nok genteng Beton Eks Mutiara 36 Zeng Datar 90 cm
/m /buah /buah /m' 2
37 Kaca bening 5 mm (ASAHI MAS) /m
HARGA (Rp.)
KETERANGAN 4 5 22000 1 zak = 40 Kg 50,000 27,000 22,500 4,500 1 zak = 21,5 kg 4,500 1 zak = 22 kg 35,000 180 4,500 5,000 90,000 67,000 50,000 8,000 45,000 3,000 4,500 4,000 8,000 7,000 8,000 150 13,000
1,200,000 1,400,000
6,000,000 8,000,000 2,800,000 3,000,000 3,200,000 3,450,000 1,800,000 2,000,000 2,100 4,000 24,000 60,000
2
38 Kaca Es untuk Boven t = 5 mm Kaca Rayband 50 %, t = 5 mm (ASAHI
/m
70,000
2
39 MAS)
/m
85,000
HARGA No.
JENIS BAHAN BANGUNAN
SATUAN (Rp) 2
40 Keramik Lantai setara Hercules 30x30
/m
30,000
2
41 Keramik dinding Setara Asia 20x25 Keramik Serit (KM/WC) setara Asia
/m
33,000
2
42 20x20 43 Keramik assesoris 10x20 44 Semen grouting 45 Kanstin Abu-abu ukr. 25.25.40
/m /buah /kg /m'
35,000 4,000 7,500 27,400
2
46 Conblock kelas biasa 47 Tripleks 3 mm (120x240) 48 Eternit Harflex 1x1 m, biasa (Kerang) Eternit Harflex 1x1 m, biasa 49 (Djubesment) 50 Gypsium Board (120x240) cm 51 Calsiboard (120x240) cm 52 List Plafon Gypsium L = 10 Cm 53 Cat kayu eks EMCO (bintang) 54 Cat Catylac 55 Plamur tembok 56 Plamur kayu 57 Thiner 58 Meni besi 59 Meni kayu 60 Amplas
/m /lembar /lembar
14,000 45,000 3,500
/lembar /lembar /lembar /m' /kg /5 Kg /kg /kg /liter /liter /liter /lembar
6,000 35,000 30,000 8,000 33,000 50,000 5,800 9,700 4,500 9,000 6,000 1,250
61 Slot dan Handle Pintu (SES) 62 Slot Pintu Kupu tarung (SES)
/bh /bh
125,000 90,000
63 Kunci KM/Wc ex. Alpha 64 Engsel pintu kuningan ukr. 3\"x4\" (aiwa) 65 Engsel H untuk Daun Jendela (Lokal) 66 Grendel ukuran 8\" (RRT) 67 Grendel Jalu untuk Jendela
/bh /ps /ps /bh /bh
20,000 16,900 5,000 3,200 3,000
KETERANGAN
68 Hak angin kuningan ukr. 21 - 30 cm 69 Handle Pintu (u/ pintu Kupu tarung)
/bh /ps
10900 50000
70 Closet duduk TOTO Monoblok 71 Closet jongkok Standart 72 Washtafel body standart INA 73 Wallshower 74 Floordrain 75 Avor (kurasan Bak) 76 Bathup Standart INA 77 Keran Air Standart (Rata-rata)
/set /set /set /set /bh /bh /set /bh
1000000 74500 200000 50000 10000 5000 1250000 15000
78 79 80 81 82 83 84 85 86
/bh /bh /bh /bh /bh /bh /bh /bh /bh
25000 25000 1000 14000 85000 2500 2000 3000 7800 HARGA
No.
Keran Dapur Soap Holder Isolasi Pipa PVC 3/4\" eks Wavin Pipa PVC 3\" eks Wavin Knee 3/4\" Sock 3/4\" Tee 3/4\" Knee 3\" JENIS BAHAN BANGUNAN
SATUAN (Rp)
87 88 89
Sock 3\" Tee 3\" Lem PVC (tube)
90
Batu Candi ( Andesit)
/bh /bh /bh
5000 8200 3500
2
/m
65,000
2
91 92 93 94 95 96 97 98 99 100
Batu Belah Baut Plate Begel Solar Lis Kayu Roster Kayu 30x 30 Sirlak Spirtus Batu Apung
/m /bh /bh /bh /ltr /m' /bh /kg /ltr /kg
65,000 1,500 1,000 7,500 2,300 3,000 45,000 60,000 6,000 4,000
KETERANGAN
NO.
DAFTAR PEKERJA
SATUAN
1
TUKANG BATU
Hari
22000
2
TUKANG KAYU
Hari
22000
3
TUKANG BESI
Hari
25000
4
TUKANG LISTRIK
Hari
25000
5
TUKANG PLAMBING
Hari
21000
6
TUKANG KERAMIK
Hari
25000
7 TUKANG BIKIN KUSEN
Hari
30000
8 TUKANG PAVING BLOK
Hari
20000
9
TENAGA
Hari
18000
TUKANG CAT
Hari
22000
10
UPAH (Rp.)
KET. per Hari per Hari per Hari per Hari per Hari per Hari per Hari per Hari per Hari per Hari
DAFTAR UPAH BORONGAN/ BA
DI KABUPATEN SLEMAN BULAN
No
A.
JENIS PEKERJAAN
Sat. Pekj
PEKERJAAN PERSIAPAN 1 Uitzet & Bouwplank
M`
2 Pembuatan Direksikit (Tripleks, Zeng, Lt. Rabat Beton) M2 3 Pembuatan Gudang (Tripleks, Zeng, Lt. Rabat Beton) M2 4 Pembuatan Brak (Tripleks, Zeng, Lt. Rabat Beton)
M2
5 Pembuatan Pagar Proyek (Balok Kayu & Zeng)
M`
6 Pembuatan Pagar Proyek (Bambu & Gedek/Anyaman M`Bambu) 7 Pembersihan Lokasi Proyek B.
M2
PEKERJAAN TANAH DAN PASIR 1 Galian Tanah (untuk Pondasi Batu Kali)
M3
2 Galian Tanah (untuk Pondasi Foot Plat)
M3
3 Urugan Tanah Kembali (termasuk Pemadatan)
M3
4 Urugan Tanah (termasuk Pemadatan).
M3
5 Urugan Pasir
M3
6 Urugan Pasir Di Bawah Pondasi ( t = 10 Cm)
M2
7 Urugan Pasir Di Bawah Lantai ( t = 10 Cm)
M2
8 Urugan Sirtu
M2
9 Urugan Splite/Koral Untuk Jalan Lingkungan
M2
AH BORONGAN/ BAS BORONG
TEN SLEMAN BULAN MARET 2005
Faktor Upah Borongan Alat (Rp) (%)
Upah Langsung (Rp)
3000 0 3,000.00
Over Head (%)
Upah Total (Rp)
32.9
3986.95
36000 0 36,000.00
32.9 47843.36
36000 0 36,000.00
32.9 47843.36
30000 0 30,000.00
32.9 39869.46
5000 0 5,000.00
32.9
6644.91
5000 0 5,000.00
32.9
6644.91
2400 0 2,400.00
32.9
3189.56
8500 0 8,500.00
32.9 11296.35
10000 0 10,000.00
32.9 13289.82
4500 0 4,500.00
32.9
5980.42
6500 0 6,500.00
32.9
8638.38
4950 0 4,950.00
32.9
6578.46
1100 0 1,100.00
32.9
1461.88
1100 0 1,100.00
32.9
1461.88
1000 0 1,000.00
32.9
1328.98
1375 0 1,375.00
32.9
1827.35
No
C.
JENIS PEKERJAAN
PEKERJAAN PASANGAN DAN PLESTERAN 1 Pasangan Batu Kali Kosong untuk Pondasi 2 Pekerjaan Pondasi Batu Kali Pecah 3 Pasangan Bata 1/2 Batu (Trasram) 4 Pasangan Bata 1/2 Batu 5 Pasangan Rolag Bata (Diatas Pondasi & Kusen) 6 Plesteran Trasram 7 Plesteran 8 Sponengan Sudut (Tembok) 9 Sponengan Beton (pada Kolom. Balok dll.) 10 Penebalan Plesteran Sederhana 11 Penebalan Plesteran Rumit (Lengkung atau sudut > 4sudut) 12 Lantai Kerja (dengan spesi tebal + 3 Cm) 13 Lantai Kerja (dengan Rabat Beton tebal > 4 Cm) 14 Pasang Glass Blok (20/20 atau setara) 15 Pasang Roster Kayu
Sat. Pekj
Faktor Upah Borongan Alat (Rp) (%)
Upah Langsung (Rp)
Over Head (%)
Upah Total (Rp)
M3
24000
0
24000
32.9 31895.57
M3
35000
7.5
37625
32.9 50002.95
M2
7200
12.5
8100
32.9 10764.76
M2
6500
12.5
7312.5
32.9
9718.18
M`
3500
12.5
3937.5
32.9
5232.87
M2
8300
10
9130
32.9 12133.61
M2
8300
10
9130
32.9 12133.61
M`
2750
0
2750
32.9
3654.7
M`
3250
0
3250
32.9
4319.19
M`
7500
10
8250
32.9
10964.1
M`
11250
10
12375
M2
3300
0
3300
32.9
4385.64
M2
5200
10
5720
32.9
7601.78
bh.
1900
0
1900
32.9
2525.07
bh.
1000
0
1000
32.9
1328.98
32.9 16446.15
D
PEKERJAAN ATAP & PLAFOND 1 KudaKuda Kayu ( Bentang < 9 M ) 2 Gording, Jurai, Murplate, Nog. 3 Usuk & Reng 4 Papan Ruiter 5 Lisjplank ( Tunggal ) 6 Lisjplank ( Double ) 7 Wenvir (Kayu Lapis Zeng) 8 Talang (Papan, Zeng, Cat Zeng & Meni Papan) 9 Plafond (Rangka Saja): 100 x 100
No
JENIS PEKERJAAN
10 Plafond (Rangka Saja): 80 x 60 11 Plafond (Rangka Saja): 60 x 60 12 Plepet ( antar penutup plafond ) 13 Profil Kayu ( Untuk Pertemuan Tembok & Plafond ) 14 Pasang Penutup Plafond saja (Dengan Asbes/Ternit) 15 Pasang Penutup Plafond saja (Dengan Kayu Lapis) E
PEKERJAAN PENUTUP ATAP 1 Genteng Keramik 2 Genteng \"Plentong\" Kampung (Standar) 3 Genteng \"Kodok\"
M3
450000
35
607500
32.9
###
M3
430000
0
430000
32.9
###
M2
4000
0
4000
32.9
5315.93
M`
1500
0
1500
32.9
1993.47
M`
7250
0
7250
32.9
9635.12
M`
14500
0
14500
M`
5000
0
5000
32.9
M`
7750
0
7750
32.9 10299.61
M2
7200
0
7200
32.9
Sat. Pekj
Faktor Upah Borongan Alat (Rp) (%)
Upah Langsung (Rp)
32.9 19270.24
Over Head (%)
6644.91
9568.67
Upah Total (Rp)
M2
11500
0
11500
32.9 15283.29
M2
13000
0
13000
32.9 17276.77
M`
1000
0
1000
32.9
1328.98
M`
1900
0
1900
32.9
2525.07
M2
1300
0
1300
32.9
1727.68
M2
1300
0
1300
32.9
1727.68
M2
6000
17.5
7050
32.9
9369.32
M2 M2
7300 10000
17.5 17.5
8577.5 11750
32.9 11399.34 32.9 15615.54
4 Kerpus Genteng Keramik 5 Kerpus Genteng Kampung F
PEKERJAAN PENUTUP LANTAI & DINDING 1 Keramik Lantai 2 Keramik Tangga 3 Keramik Dinding 4 Keramik Plin 5 Keramik Assesories 6 Pasang Dinding Batu Alam (Jenis Bt Alam Rata) 7 Pasang Dinding Batu Alam (Jenis Bt Alam Tidak Rata)
No
G
JENIS PEKERJAAN
PEKERJAAN KUSEN & DAUN PINTUJENDELA 1 Bikin Kusen Pintu & Jendela (Kayu < Klas 2) 2 Bikin Kusen Pintu & Jendela ( Jati, Ulin, & Setara ) 3 Bikin Krepyak untuk Kusen Pintu dan Jendela 4 Bikin Daun Pintu Panil 5 Bikin Daun Pintu Double Teakwood (Setara) 6 Bikin Daun Jendela ( Tidak Ber Regel/Teler ) 7 Bikin Daun Jendela ( Termasuk Regel/Teler ) 8 Stel Kusen Di Proyek 9 Stel Daun Pintu Panil
M`
14500
17.5
17037.5
32.9 22642.53
M`
14500
17.5
17037.5
32.9 22642.53
M2
7400
25
9250
32.9 12293.08
M2
13800
100
27600
32.9 36679.91
M2
15000
100
30000
32.9 39869.46
M`
3400
100
6800
32.9
9037.08
bh
500
100
1000
32.9
1328.98
M2
15000
200
45000
32.9 59804.19
M2
20000
50
30000
32.9 39869.46
Sat. Pekj
Faktor Upah Borongan Alat (Rp) (%)
Upah Langsung (Rp)
Over Head (%)
Upah Total (Rp)
M3
575000
50
862500
32.9 1,146,247.07
M3
700000
75 1,730,000.00
32.9 2,299,139.05
M3
800000
75 1,620,000.00
32.9 2,152,951.02
bh.
48750
100
128500
32.9 170774.2
bh.
26000
25
32500
32.9 43191.92
bh.
30000
50
45000
32.9 59804.19
bh.
32500
50
48750
32.9 64787.88
M3
340000
0
340000
bh.
31000
0
31000
32.9
###
32.9 41198.45
10 Stel Daun Pintu Double Teakwood (atau setara) 11 Stel Daun Jendela 12 Stel Daun Jendela BV H
PEKERJAAN SANITASI & DRAINASI 1 Pasang Closet Jongkok 2 Pasang Closet Duduk Monoblok 3 Pasang Washtafel 4 Pasang Washtafel & Penyangga 5 Pasang Washbak (Tempat Cuci Piring) 6 Pasang WallShower 7 Pasang Double Hug 8 Pasang Tempat Sabun (di Dinding) 9 Pasang Kran 10 Pasang Stop Kran 11 Pasang Floor Drain 12 Pasang Avor
No
JENIS PEKERJAAN
13 Bikin Bak Mandi (Standar) 14 Instalasi (PVC) Water Torn) 15 Saluran Air Bersih (PVC diameter: 1' ; 3/4' ; 1/2') 16 Saluran Air Sabun & Air Kotor dengan PVC
bh.
27000
0
27000
32.9 35882.52
bh.
25000
0
25000
32.9 33224.55
bh.
18000
0
18000
32.9 23921.68
Unit
36300
0
36300
32.9 48242.05
Unit
72600
0
72600
32.9
96484.1
Unit
72600
0
72600
32.9
96484.1
Unit
90750
0
90750
32.9
###
Unit
42350
0
42350
32.9 56282.39
Unit
15125
0
15125
32.9 20100.85
bh.
15125
0
15125
32.9 20100.85
bh.
15125
0
15125
32.9 20100.85
bh.
3600
0
3600
32.9
4784.34
bh.
6000
0
6000
32.9
7973.89
bh.
9000
0
9000
32.9 11960.84
bh.
9000
0
9000
32.9 11960.84
Sat.
Faktor Upah Borongan Alat
Upah Langsung
Over Head
Upah Total
Pekj
(Rp)
(Rp)
(%)
(Rp)
(%)
Unit
93750
0
93750
32.9
###
Unit
30000
0
30000
32.9 39869.46
M'
2500
0
2500
32.9
3322.46
M'
5000
0
5000
32.9
6644.91
17 Bak Kontrol Tertutup (Air Sabun & Air Bersih) Stndar 18 Bikin Sumur Resapan 19 Bikin Septictank I
PEKERJAAN STRUKTUR BETON & BAJA 1 Besi Untuk Struktur Beton Bertulang Dia < 12 mm 2 Besi Untuk Struktur Beton Bertulang Dia > 12 mm 3 Bekesting Kolom Praktis, Sloof, Ring Balok, dll. 4 Cort Beton Kolom Praktis, Sloof, Ring Balok dll. 5 Perancah Bambu
J
PEKERJAAN CAT ; MELAMIN ; POLITUR 1 Cat Tembok ( 3 Sapuan ) 2 Meni Bidang Kayu Baru 3 Cat Kayu ( 3 Kali Sapuan ) 4 Politur 5 Melamin 6 Cat Genteng, Asbes Gelombang.
K
PERKERASAN JALAN LINGKUNGAN 1 Pasang Makadam / Bt. Kali Pecah (tebal < 28 Cm) 2 Batu Pecah 5/7 (tebal < 15 Cm) 3 Batu Pecah 2/3 (tebal < 6 Cm)
No
JENIS PEKERJAAN
Unit
52000
0
52000
Unit
100000
0
100000
32.9
###
Unit
350000
0
350000
32.9
###
Kg.
400
17.5
470
32.9
624.62
Kg.
330
17.5
387.75
32.9
515.31
M2
1750
0
1750
32.9
2325.72
M3
35000
35
47250
32.9
62794.4
M2
3000
0
3000
32.9
3986.95
M2
4125
17.5
4846.88
32.9
6441.41
M2
2900
10
3190
32.9
4239.45
M2
9600
35
12960
32.9 17223.61
M2
13750
35
18562.5
32.9 24669.23
M2
25000
35
33750
32.9 44853.15
M2
2400
15
2760
32.9
3667.99
M2
3300
25
4125
32.9
5482.05
M2
2000
25
2500
32.9
3322.46
M2
2000
25
2500
32.9
3322.46
Sat. Pekj
Faktor Upah Borongan Alat (Rp) (%)
Upah Langsung (Rp)
32.9 69107.07
Over Head (%)
Upah Total (Rp)
L
4 Sirtu (tebal < 10 Cm)
M2
5 Pasang Conblok
M2
6 Pengasphalan
M2
7 Pasang Kansten
M'
LISTRIK DAN PENANGKAL PETIR 1 Lampu (piting & Saklar)
ttk.
2 Stop Kontak.
ttk.
3 NCB
Unit
4 Penangkal Petir 1 speed dgn 2 Arde (Arde maks 5,0M) Unit
Besarnya Over Head (OH)
1600
25
2000
32.9
2657.96
4600
0
4600
32.9
6113.32
2500
25
3125
32.9
4153.07
1900
0
1900
32.9
2525.07
24200
0
24200
32.9 32161.37
24200
0
24200
32.9 32161.37
82500
0
82500
32.9
###
310000
0
310000
32.9
###
32.90
%
DAFTAR ANALISIS HARGA SATUAN PEKERJAAN (HSP) - TANPA OVER HEAD PROYEK : SAMPLE LOKASI : SAMPLE A 1.
PEKERJAAN PERSIAPAN MOBILISASI Upah :
1 ls.
@
1M2 PEMBERSIHAN LOKASI 2. PROYEK Upah :
1.00
M2
@
1 M' PEKERJAAN UITZET & 3. BOUWPLANK Bahan : Papan Sengon 0.5500
Lbr
@
Balok Kayu 0.0060
M3
@
Paku 0.0200
Kg.
@
Upah :
1 M' PEMAGARAN LOKASI PROYEK
1 M`
@
Rp. 200,000.00
. = Rp.
200,000.00
Rp. 2,800.00
. = Rp.
2,800.00
Rp. 3,000.00
. = Rp.
1,650.00
Rp. 1,200,000.00
. = Rp.
7,200.00
Rp. 7,000.00
. = Rp. . = Rp.
140.00 8,990.00
Rp. 3,000.00 Total
. = Rp. . = Rp.
3,000.00 11,990.00
4 Bahan : Zeng 1.2500
Lbr
@
Balok Kayu 0.0300
M3
@
Paku Zeng 12.5000
bh.
@
Paku 0.0200
Kg.
@
Upah :
1 M`
@
M2
@
1 M2 PEKERJAAN 5. DIREKSIKIT Bahan & Upah :
6.
1 M2 PEKERJAAN MEMBUAT BRAK UNTUK GUDANG Bahan & Upah :
7.
1.00
m2
@
ADMINISTRASI DAN DOKUMENTASI Bahan & Upah :
B
1.00
PEKERJAAN TANAH DAN PASIR
1 ls.
@
Rp. 8,000.00 Rp. 1,200,000.00
. = Rp. . = Rp.
10,000.00 36,000.00
Rp. 150.00
. = Rp.
1,875.00
Rp. 7,000.00
. = Rp. . = Rp.
140.00 48,015.00
Rp. 5,000.00 Total
. = Rp. . = Rp.
5,000.00 53,015.00
Rp. 100,000.00
. = Rp.
100,000.00
Rp. 100,000.00
. = Rp.
100,000.00
Rp. 150,000.00
. = Rp.
150,000.00
1 M3 PEKERJAAN GALIAN TANAH 1. BIASA Untuk Pondasi Batu Kali Upah :
2.
1 m3
@
Rp. 8,500.00
1 m3
@
Rp. 10,000.00
1 m3
@
Rp. 4,500.00
m3
@
Rp. 22,500.00
1 m3
@
Rp. 6,500.00
m3
@
Rp. 27,000.00
1 M3 PEKERJAAN GALIAN TANAH s.d. -2 M Untuk Foot Plate Upah :
1 M3 PEKERJAAN URUGAN TANAH 3. KEMBALI Upah : *) *). Termasuk Pemadatan 4. 1 M3 PEKERJAAN URUGAN TANAH Dengan Mendatangkan Tanah dari Luar Bahan : Tanah Urug 1.2000 Upah : *) *). Termasuk Pemadatan
5.
1 M3 PEKERJAAN URUGAN PASIR Bahan : Pasir 1.2000
Rp. 8,500.00 Total
. = Rp. . = Rp.
8,500.00 8,500.00
Rp. 10,000.00 Total
. = Rp. . = Rp.
10,000.00 10,000.00
Rp. 4,500.00 Total
. = Rp. . = Rp.
4,500.00 4,500.00
Rp. 22,500.00
. = Rp.
27,000.00
Rp. 6,500.00
. = Rp.
6,500.00
. = Rp.
33,500.00
. = Rp.
32,400.00
Total
Rp. 27,000.00
Upah :
1
m3
@
Rp. 4,950.00
m3
@
Rp. 27,000.00
m3
@
Rp. 1,243.13
6. 1 M2 PEKERJAAN URUGAN PASIR TEBAL = 10 CM` Bahan : Pasir 0.1200 Upah :
1
C
PEKERJAAN PASANGAN & PLESTERAN
1.
1 M3 PEKERJAAN PASANGAN PONDASI BATU KALI PECAH ( 1 PC : 6 PS ) Bahan : Batu Kali 1.2000
m3 @ Rp. 35,000.00
Semen (pc) 3.0698
zak @ Rp. 22,000.00
Kapur
-
zak @ Rp. 4,500.00
Pasir Pasang 0.6175
m3 @ Rp. 50,000.00
Upah :
m3 @ Rp. 37,625.00
1
1 M3 PEKERJAAN PASANGAN BATU KALI 2. KOSONG Bahan : Batu Kali 1.2000 Pasir Pasang 0.4500
m3 m3
@ Rp. 35,000.00 @
Rp. 4,950.00 Total
. = Rp. . = Rp.
4,950.00 37,350.00
Rp. 27,000.00
. = Rp.
3,240.00
Rp. 1,243.13 Total
. = Rp. . = Rp.
1,243.13 4,483.13
. 35,000.00
. = Rp.
42000
. 22,000.00
. = Rp.
67535.08
1 PC : 6 PS )
. = Rp.
. 50,000.00
. 37,625.00 Total :
p. 35,000.00
-
. = Rp.
30873.18
. = Rp.
140408.26
. = Rp.
37625
. = Rp.
178033.26
. = Rp. . = Rp.
42000
Rp. 27,000.00
Upah :
1
m3
@ Rp. 24,000.00
1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU TRASRAM (1 PC : 3. 3 PS) Bahan : Batu Bata
Pasir Pasang (Ayak)
77.0000
@ Rp. 180.00
Semen (pc)
0.6077
zak
@ Rp. 22,000.00
Kapur
-
zak
@ Rp. 4,500.00
m3
@ Rp. 50,000.00
m2
@ Rp. 8,100.00
0.0611
Upah :
4.
bh
1
1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU (1 PC : 5 PS) Bahan : Batu Bata Semen (pc) Kapur
70.0000
bh
@ Rp. 180.00
0.4093 zak @ Rp. 22,000.00 - zak @
12150 . = Rp.
54150
. = Rp.
24000
. = Rp.
78150
. 180.00
. = Rp.
13860
p. 22,000.00
. = Rp.
13369.32
p. 4,500.00
. = Rp.
p. 50,000.00
. = Rp.
p. 24,000.00 Total :
. = Rp.
p. 8,100.00 Total
. = Rp.
3,055.84
30285.16 8,100.00
. = Rp.
38385.16
. = Rp.
12600
. = Rp. . = Rp.
9,004.49
-
Rp. 4,500.00 Pasir Pasang (Ayak)
0.0686
m3
@ Rp. 50,000.00
Upah :
1.0000
m2
@ Rp.
1 M' PEKERJAAN ROLLAG BATA (1 PC : 5. 3 PS) Bahan : Batu Bata
14 bh
@ Rp.
Semen (pc)
0.2263
zak
@ Rp.
Pasir Pasang (Ayak)
0.0122
m3
@ Rp.
Upah :
1 m'
@ Rp.
1 M2 PEKERJAAN PLESTERAN (1PC : 5 PS), T = 20 6. MM Bahan : Semen (pc)
0.1428
Kapur
-
zak zak
@ Rp. @ Rp.
Pasir Pasang (Ayak)
0.0239
m3
@ Rp.
Upah :
1.0000
m2
@ Rp.
1 M2 PEKERJAAN PLESTERAN TRASRAM (1 PC : 3 PS) T = 20 7. MM Bahan : Semen (pc)
0.2121
zak
@
Rp. 4,500.00 . = Rp.
3,430.28
. = Rp. 7312.5
25034.77 . = Rp.
7,312.50
. = Rp.
32347.27
180
. = Rp.
2,520.00
22000
. = Rp.
4,978.82
50000
. = Rp. . = Rp.
611.68 8,110.51
3937.5
. = Rp.
3,937.50
. = Rp.
12048.01
22000
. = Rp.
3,142.38
4500
. = Rp.
-
50000
. = Rp. . = Rp.
1,197.10 4,339.48
9130
. = Rp.
9,130.00
. = Rp.
13469.48
Total
Total
Total
. = Rp.
4,665.62
Rp. 22,000.00 Kapur
-
Pasir Pasang (Ayak) Upah :
0.0213 1
zak
@ Rp. 4,500.00
m3
@ Rp. 50,000.00
m2
@ Rp. 9,130.00
1 M2 PEKERJAAN PLESTERAN UNTUK BETON (1 PC : 3 PS) T = 6 8. MM Bahan : Semen (pc)
0.0943
zak
@ Rp. 22,000.00
Kapur
-
zak
@ Rp. 4,500.00
m3
@ Rp. 50,000.00
m2
@ Rp. 9,130.00
zak
@ Rp. 22,000.00
zak
@ Rp. 4,500.00
m3
@ Rp. 50,000.00
m2
@
Pasir Pasang (Ayak) Upah :
0.0095 1
1 M' PEKERJAAN SPONENGAN SUDUT ( 1 PC : 2 9. PS ) Bahan : Semen (pc)
0.0249
Kapur (Mill)
-
Pasir Pasang (Ayak) Upah :
0.0017 1
Rp. 22,000.00
p. 4,500.00
. = Rp.
p. 50,000.00
. = Rp. . = Rp.
1,066.43 5,732.05
p. 9,130.00
. = Rp.
9,130.00
Total
. = Rp.
-
14862.05
p. 22,000.00
. = Rp.
p. 4,500.00
. = Rp.
p. 50,000.00
. = Rp. . = Rp.
473.97 2,547.58
p. 9,130.00
. = Rp.
9,130.00
Total
. = Rp.
p. 22,000.00
. = Rp.
p. 4,500.00
. = Rp.
p. 50,000.00
. = Rp. . = Rp. . = Rp.
2,073.61
-
11677.58
547.39
83.41 630.81 2,750.00
1 M2 PEKERJAAN PENEBALAN PLESTERAN 10. TYPE A Bahan : Semen (pc)
0.0071
Pasir Pasang (Ayak)
0.0012
Upah :
zak
@ Rp. 22,000.00
m3
@ Rp. 50,000.00
1 m2
@ Rp. 8,250.00
1 M2 PEKERJAAN PENEBALAN PLESTERAN 11. TYPE B Bahan : Semen (pc)
0.0114
Pasir Pasang (Ayak)
0.0019
Upah :
zak
@ Rp. 22,000.00
m3
@ Rp. 50,000.00
1 m2
@ Rp. 8,250.00
12. 1 M2 PEKERJAAN LANTAI KERJA ( 1PC : 4 PS) TEBAL 30 MM Bahan : Semen (pc) 0.3414
zak @
Rp.
22,000.00
Pasir Pasang (Ayak) 0.0458
m3 @
Rp.
50,000.00
Upah :
m2 @
Rp.
3,300.00
1
Rp. 2,750.00 Total
Total
Total
Total
. = Rp.
3,380.81
. = Rp.
157.12
. = Rp. . = Rp.
59.85 216.97
. = Rp. . = Rp.
8,250.00 8,466.97
. = Rp.
251.39
. = Rp. . = Rp.
95.77 347.16
. = Rp. . = Rp.
8,250.00 8,597.16
. = Rp.
7510.84
. = Rp.
2289.02
. = Rp.
9799.86
. = Rp.
3300
. = Rp.
13099.86
1 M2 PEKERJAAN LANTAI KERJA ( 1 PC : 3 PS : 5 KR) TEBAL 13. 50 MM Bahan : Semen (pc) 0.3047
zak @
Rp.
22,000.00
Pasir 0.0292
m3 @
Rp.
50,000.00
m3 @
Rp.
50,000.00
m2 @
Rp.
5,720.00
Krikil 0.0266
Upah :
E 1.
1
PEKERJAAN PENUTUP LANTAI DAN DINDING 1M2 PEKERJAAN PASANGAN KERAMIK LANTAI 30/30 Bahan : Keramik Lantai Semen (pc)
1.1000 0.1730
m2
@
Rp. 30,000.00
zak
@
Rp. 22,000.00
Pasir
0.0206
m3
@
Rp. 50,000.00
Semen Grouting
0.1833
m3
@
Rp. 7,500.00
Total
. = Rp.
6702.65
. = Rp.
1462.4
. = Rp.
1327.76
. = Rp.
9492.8
. = Rp.
5720
. = Rp.
15212.8
Rp. 30,000.00
. = Rp.
33000
Rp. 22,000.00
. = Rp.
3805.49
Rp. 50,000.00
. = Rp.
1030.06
Rp. 7,500.00
. = Rp.
1375
Upah :
2.
1
m2
@
1M2 PEKERJAAN PASANGAN KERAMIK KM/WC 20/20 Bahan : Keramik Serit Semen (pc) Pasir
3.
1.1000 0.1730
0.0206
m2
@
zak
@
m3
@
Semen Grouting
0.1833
m3
@
Upah :
1
m2
@
m2
@
zak
@
m3
@
1M2 PEKERJAAN PASANGAN KERAMIK DINDING Bahan : Keramik Dinding Semen (pc) Pasir
1.1000 0.1297
0.0155
Semen Grouting
0.1833
m3
@
Upah :
1
m2
@
. = Rp.
39210.55
. = Rp.
9250
. = Rp.
48460.55
Rp. 35,000.00
. = Rp.
38500
Rp. 22,000.00
. = Rp.
3805.49
Rp. 50,000.00
. = Rp.
1030.06
Rp. 7,500.00
. = Rp.
1375
. = Rp.
44710.55
. = Rp.
9250
. = Rp.
53960.55
Rp. 33,000.00
. = Rp.
36300
Rp. 22,000.00
. = Rp.
2854.12
Rp. 50,000.00
. = Rp.
772.54
Rp. 7,500.00
. = Rp.
1375
. = Rp.
41301.66
. = Rp.
30000
. = Rp.
71301.66
Rp. 9,250.00 Total
Rp. 9,250.00 Total
Rp. 30,000.00 Total
4.
1M' PEKERJAAN PASANGAN KERAMIK PLINT T = 12 CM Bahan : Keramik Dinding Semen (pc) Pasir
5.
0.1667 0.0156
0.0019
m2
@
zak
@
m3
@
Semen Grouting
0.0220
m3
@
Upah :
1
m2
@
1 BH PEKERJAAN PASANGAN KERAMIK ASSESORIES (8 X 20) CM Bahan :
Keramik Assesories
1.1000
Semen (pc) Pasir
6.
0.0021
0.0002
bh
@
zak
@
m3
@
Semen Grouting
0.0029
m3
@
Upah :
1
m2
@
1M2 PEKERJAAN BATU ALAM PADA
Rp. 30,000.00
. = Rp.
5001
Rp. 22,000.00
. = Rp.
342.49
Rp. 50,000.00
. = Rp.
92.71
Rp. 7,500.00
. = Rp.
165
. = Rp.
5601.2
. = Rp.
6800
. = Rp.
12401.2
Rp. 4,000.00
. = Rp.
4400
Rp. 22,000.00
. = Rp.
45.67
Rp. 50,000.00
. = Rp.
12.36
Rp. 7,500.00
. = Rp.
22
. = Rp.
4480.03
. = Rp.
1000
. = Rp.
5480.03
Rp. 6,800.00 Total
Rp. 1,000.00 Total
DINDING Bahan : Batu Alam Semen (pc) Pasir
1.1200 0.1297
0.0155
Upah :
7.
m2 zak m3
1
m2
1M2 PEKERJAAN BATU ALAM SUSUN SIRIH PADA PILAR Bahan : Batu Belah
275.0000
Semen (pc)
0.1297
Pasir
Upah : G 1.
0.0155
bh zak m3
1
m2
PEKERJAAN RANGKA ATAP & PLAFOND 1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. KRUING
@
Rp. 65,000.00 . = Rp.
72800
@
Rp. 22,000.00 . = Rp.
2854.12
@
Rp. 50,000.00 . = Rp.
772.54
. = Rp.
76426.66
Rp. 45,000.00 . = Rp.
45000
@
Total
. = Rp.
121426.66
@
Rp. 500.00 . = Rp.
137500
@
Rp. 22,000.00 . = Rp.
2854.12
@
Rp. 50,000.00 . = Rp.
772.54
. = Rp.
141126.66
Rp. 30,000.00 . = Rp.
30000
@
Total
. = Rp.
171126.66
(Jarak Usuk 40; Jarak Reng 36 cm) Bahan : Balok Kayu 0.0092
m3
@ Rp. 2,800,000.00
Reng Kayu 0.0045
Kg
@ Rp. 1,800,000.00
Paku 0.2000
Kg
@ Rp. 7,000.00
M2
@ Rp. 4,000.00 Total :
Upah :
1
2. 1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. KRUING (Jarak Usuk 45 cm; Jarak Reng 35 cm) Bahan : Balok Kayu 0.0092
m3
@ Rp. 2,800,000.00
Reng Kayu 0.0064
Kg
@ Rp. 1,800,000.00
Paku 0.2000
Kg
@ Rp. 7,000.00
M2
@ Rp. 4,000.00 Total :
Upah :
3.
1
1 M3 PEKERJAAN GORDING, NOG, JURAI, MURPLATE. KAYU BANGKIRAI 8/12 Bahan : Balok Kayu
m3
@
@ Rp. 2,800,000.00
. = Rp.
25,872.00
@ Rp. 1,800,000.00
. = Rp.
8,188.71
. = Rp. . = Rp.
1,400.00 35,460.71
. = Rp. . = Rp.
4,000.00 39,460.71
@ Rp. 2,800,000.00
. = Rp.
25,872.00
@ Rp. 1,800,000.00
. = Rp.
11,583.00
. = Rp. . = Rp.
1,400.00 38,855.00
. = Rp. . = Rp.
4,000.00 42,855.00
BANGKIRAI 8/12 . = Rp.
3,080,000.00
1.1 Baut 50.0833
Rp. 2,800,000.00 bh
@ Rp. 1,500.00
m3
@ Rp. 430,000.00
Papan Kayu 0.0044
m3
@ Rp. 3,000,000.00
Paku 0.0200
bh
@ Rp. 7,000.00
m`
@ Rp. 1,500.00
Upah :
1
1 M` PEKERJAAN PAPAN RUITER KAYU BANGKIRAI 4. 2/20 Bahan :
Upah :
1
1 M` PEKERJAAN PAPAN LISJPLANK TUNGGAL KAYU BANGKIRAI 5. 2/25 Bahan : Papan Kayu 0.0055
m3
@ Rp. 3,000,000.00
Paku 0.0200
bh
@ Rp. 7,000.00
m`
@ Rp. 7,250.00
Upah : 6.
1
1 M` PEKERJAAN PAPAN LISJPLANK DOUBLE KAYU BANGKIRAI 2/20; 2/25 Bahan : Papan Kayu 0.0110
m3
@ Rp. 3,000,000.00
Paku 0.0400
bh
@ Rp. 7,000.00
m`
@ Rp. 14,500.00
Upah :
1
Rp. 2,800,000.00
@ Rp. 1,500.00
. = Rp. . = Rp.
75,125.00 3,155,125.00
@ Rp. 430,000.00 Total :
. = Rp. . = Rp.
430,000.00 3,585,125.00
@ Rp. 3,000,000.00
. = Rp.
13,200.00
@ Rp. 7,000.00
. = Rp. . = Rp.
140.00 13,340.00
@ Rp. 1,500.00 Total :
. = Rp. . = Rp.
1,500.00 14,840.00
@ Rp. 3,000,000.00
. = Rp.
16,500.00
@ Rp. 7,000.00
. = Rp. . = Rp.
140.00 16,640.00
@ Rp. 7,250.00 Total :
. = Rp. . = Rp.
7,250.00 23,890.00
IRAI 2/20; 2/25
@ Rp. 3,000,000.00
. = Rp.
33,000.00
@ Rp. 7,000.00
. = Rp. . = Rp.
280.00 33,280.00
@ Rp. 14,500.00 Total :
. = Rp. . = Rp.
14,500.00 47,780.00
1M' PEKERJAAN TALANG ZENG; PAPAN KAYU 7. MERANTI Bahan : Seng BJLS 30 1.1000
m'
Papan Kayu Meranti 0.0176
m3
Paku Seng (Payung) 10.0000
buah
Paku 0.2000 Upah :
kg 1 m'
1 M' PEKERJAAN WENVIR 8 DENGAN SENG Bahan : Seng Papan Kayu Meranti
1.1 m' 0 m3
Paku
Upah :
0.02 kg
1 m'
1 M2 PEKERJAAN RANGKA PLAFOND KY KRUING - PENUTUP 9. GYPSUM Rangka = 60 x 60 CM Bahan : Gypsum 0.3819 Balok Kayu 0.0136
m3 Paku 0.2000
Paku Plepet 0.0200
m3
Kg Kg
@ Rp. 24,000.00 @ Rp. 1,400,000.00
. = Rp. . = Rp.
26,400.00 24,640.00
@ Rp. 150.00
. = Rp.
1,500.00
@ Rp. 7,000.00
. = Rp. . = Rp.
1,400.00 53,940.00
@ Rp. 7,750.00
. = Rp. Total . = Rp.
7,750.00 61,690.00
@ Rp. 8,000.00
. = Rp.
8,800.00
@ Rp. 1,400,000.00
. = Rp.
3,640.00
@ Rp. 7,000.00
. = Rp. . = Rp.
140.00 12,580.00
@ Rp. 5,000.00
. = Rp. Total . = Rp.
5,000.00 17,580.00
@ Rp. 35,000.00
. = Rp.
13,368.06
@ Rp. 1,800,000.00
. = Rp.
24,552.00
@ Rp. 7,000.00
. = Rp.
1,400.00
@ Rp. 8,000.00
. = Rp. . = Rp.
160.00 39,480.06
Upah :
1 m2
10. 1 M2 PEKERJAAN RANGKA PLAFOND - PENUTUP CALSIBOARD Rangka = 100 x 100 CM Bahan : Calsiboard 0.3819
m3
Balok Kayu 0.0092
m3 Paku 0.2000
Kg
Paku Plepet 0.0200
Kg Upah :
1 m2
Lis Gypsium L=10 cm 1.0000
m3
1 M' PEKERJAAN LIS GYPSIUM LEBAR : 10 11. CM Bahan dan Upah :
H
PEKERJAAN PENUTUP ATAP & PLAFOND.
1.
1 M2 PEKERJAAN PENUTUP ATAP GENTENG KERAMIK SOKKA TYPE MORANDO Bahan :
Genteng Keramik
9.9000
Upah :
2.
bh
@
Rp.
1.0000 m2
@
Rp.
1 M' PEKERJAAN KERPUS GENTENG KERAMIK SOKKA TYPE MORANDO SE, BES Bahan :
@ Rp. 13,000.00 Total :
. = Rp. . = Rp.
13,000.00 52,480.06
@ Rp. 30,000.00
. = Rp.
11,458.33
@ Rp. 1,800,000.00
. = Rp.
16,632.00
@ Rp. 7,000.00
. = Rp.
1,400.00
@ Rp. 8,000.00
. = Rp. . = Rp.
160.00 29,650.33
@ Rp. 7,200.00 Total :
. = Rp. . = Rp.
7,200.00 36,850.33
m' Rp. 8,000.00
. = Rp.
8,000.00
Total :
. = Rp.
8,000.00
. = Rp.
20790
. = Rp.
20790
. = Rp.
7050
. = Rp.
27840
KA TYPE MORANDO SE, BESAR
2,100.00
7,050.00
Total : MORANDO SE, BESAR
Genteng Kerpus Semen Pasir
Upah : F 1.
2.
3.
3.3000 m3
@
0.2601 m3 0.0366 Kg
Rp. @
@
1.0000 m2
Rp. Rp.
@
Rp.
PEKERJAAN KUSEN DAN DAUN PINTU JENDELA 1 M3 PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12 Bahan : Balok Kayu 1.1000 Paku 5.0000
m3 Kg
@ @
Upah :
m3
@
1
1 M' PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12 Bahan : Balok Kayu 0.0087 Paku 0.0360
m3 Kg
@ @
Upah :
m'
@
1
1 M3 PEKERJAAN KREPYAK KAYU JATI UNTUK KUSEN Bahan : Papan Kayu 1.1000 Paku 5.0000
m3 Kg
@ @
Upah :
m3
@
m3 Kg
@ @
1
1 BH DAUN PINTU PANIL 3,5 X 82 X 200 4. CM Bahan : Papan Kayu 0.0631 Lem 0.1500
4,000.00
. = Rp.
13200
22,000.00
. = Rp.
5722.54
50,000.00
. = Rp.
1831.21
. = Rp.
20753.76
. = Rp.
17037.5
. = Rp.
37791.26
17,037.50
Total :
Rp. Rp. Rp.
6,000,000.00 7,000.00
. = Rp. . = Rp.
6,600,000.00 35,000.00
1,730,000.00 Total :
. = Rp. . = Rp. . = Rp.
6,635,000.00 1,730,000.00 8,365,000.00
Total :
. = Rp. . = Rp. . = Rp. . = Rp. . = Rp.
52,272.00 252.00 52,524.00 12,456.00 64,980.00
Total :
. = Rp. . = Rp. . = Rp. . = Rp. . = Rp.
8,800,000.00 35,000.00 8,835,000.00 1,620,000.00 10,455,000.00
. = Rp. . = Rp.
504,800.00 1,200.00
Rp. Rp.
6,000,000.00 7,000.00
Rp.
12,456.00
Rp. Rp.
8,000,000.00 7,000.00
Rp.
1,620,000.00
Rp. Rp.
8,000,000.00 8,000.00
Upah :
1
bh
@
m3 Kg
@ @
bh
@
m3 Kg
@ @
bh
@
1 BH DAUN PINTU PANIL 3 X 74 5. X 200 CM Papan Kayu
Bahan : 0.0488 Lem 0.1500 Upah :
1
1 BH DAUN PINTU PANIL 3 X 61 6. X 200 CM Papan Kayu
Bahan : 0.0403 Lem 0.1500 Upah :
1
1 BH DAUN JENDELA 52 X 150 CM; KAYU JATI 7. POLITUR Bahan : Ram Kayu 3,5 cm Kaca Bening 5 mm
0.0156 0.4725 Upah :
1
m3
@
m2
@
bh
@
m3
@
m2
@
bh
@
1 BH DAUN JENDELA 62 X 116 CM; KAYU JATI 8. POLITUR Bahan : Ram Kayu 3,5 cm Kaca Bening 5 mm
0.0137 0.4500 Upah :
1
. = Rp. . = Rp. . = Rp.
506,000.00 184,740.00 690,740.00
. = Rp. . = Rp. . = Rp. . = Rp. . = Rp.
390,400.00 1,200.00 391,600.00 179,020.00 570,620.00
322,400.00 1,200.00 323,600.00 175,620.00 499,220.00
Rp.
184,740.00 Total :
Rp. Rp.
8,000,000.00 8,000.00
Rp.
179,020.00 Total :
Rp. Rp.
8,000,000.00 8,000.00
Rp.
175,620.00
. = Rp. . = Rp. . = Rp. . = Rp.
Total :
. = Rp.
Rp. 8,000,000.00
. = Rp.
124,800.00
Rp. 60,000.00 . = Rp. . = Rp.
28,350.00 153,150.00
Rp. 70,000.00 . = Rp. Total : . = Rp.
70,000.00 223,150.00
Rp. 8,000,000.00
. = Rp.
109,600.00
Rp. 60,000.00 . = Rp. . = Rp.
27,000.00 136,600.00
Rp. 70,000.00 . = Rp.
70,000.00
Total : 1 BH DAUN JENDELA 62 X 166 CM; KAYU JATI 9. POLITUR Bahan : Ram Kayu 3,5 cm Kaca Bening 5 mm
0.0176 0.6750
Upah :
10.
1
m3
@
Rp. 8,000,000.00
m2
@
Rp. 60,000.00
bh
@
Rp. 70,000.00 Total :
bh
@
Rp. 45,000.00
bh
@
Rp. 1,000.00 Total :
m2
@
Rp. 70,000.00
1 BH ROSTER KAYU 30 X 40 CM Bahan : Roster Kayu
1.0000
Upah :
1
1 M2 PEKERJAAN KACA ES UNTUK 11. BOVEN Bahan dan Upah : Kaca Es 5mm Lis Kayu J 1.
1.0000
4.0000
m'
@
Rp. 3,000.00 Total :
Cat Kayu 0.2750
Kg
@ Rp. 33,000.00
Plamur Kayu 0.1375
Kg
@ Rp. 9,700.00
Dempul Jadi 0.5000 Thiner
bh @ Rp. 1,000.00 ltr @
PEKERJAAN CAT DAN POLITUR 1 M2 PENGECATAN KAYU BARU Bahan :
.
Rp. 8,000,000.00
. = Rp.
. = Rp.
206,600.00
140,800.00
Rp. 60,000.00
. = Rp. . = Rp.
40,500.00 181,300.00
Rp. 70,000.00
. = Rp. . = Rp.
70,000.00 251,300.00
Rp. 45,000.00
. = Rp. . = Rp.
45,000.00 45,000.00
Rp. 1,000.00
. = Rp. . = Rp.
1,000.00 46,000.00
Rp. 70,000.00
. = Rp.
70,000.00
Rp. 3,000.00
. = Rp. . = Rp.
12,000.00 82,000.00
. 33,000.00
. = Rp.
9,075.00
. 9,700.00
. = Rp.
1,333.75
. 1,000.00
. = Rp. . = Rp.
500.00 1,125.00
0.25 Amplas 1.0000
Rp. 4,500.00 lbr
Upah :
1 bh
@ Rp. 1,250.00 @ Rp. 12,960.00
1M2 PEKERJAAN MENI BIDANG KAYU 2 BARU Bahan : Menie Jadi Upah :
0.28 kg
@ Rp. 6,000.00
1.0000 m2 @ Rp. 3,190.00
1M2 PEKERJAAN PENGECATAN KAYU 3 BARU Bahan dan Upah: Cat-catan
1.0000 m2 @ Rp. 26,243.75
Menie
1.0000 m2 @ Rp. 4,840.00
4 1M2 PEKERJAAN PENGECATAN TEMBOK DGN CAT CATYLAC (Untuk Eksterior dan Plafon) Bahan : Cat Tembok Catylac
0.18 kg
@ Rp. 10,000.00
Plamur Jadi
0.05 kg
@ Rp. 5,800.00
Amplas
0.25 lbr
@ Rp. 1,250.00
Upah :
1.0000 m2 @ Rp. 4,846.88
5 1M2 PEKERJAAN POLITUR UNTUK KUSEN DAN DAUN PINTU DAN JENDEL Bahan :
Rp. 4,500.00
. 1,250.00
. = Rp. . = Rp.
1,250.00 13,283.75
. 12,960.00 Total :
. = Rp. . = Rp.
12,960.00 26,243.75
@ Rp. 6,000.00
. = Rp. . = Rp.
1,650.00 1,650.00
. = Rp. . = Rp.
3,190.00 4,840.00
. = Rp.
26,243.75
. = Rp.
4,840.00
. = Rp.
31,083.75
@ Rp. 10,000.00
. = Rp.
1,830.00
@ Rp. 5,800.00
. = Rp.
266.80
@ Rp. 1,250.00
. = Rp. . = Rp.
312.50 2,409.30
. = Rp. . = Rp.
4,846.88 7,256.18
Total
Total
Total
PINTU DAN JENDELA
Sirlak
0.03 kg
@ Rp. 60,000.00
Spirtus
0.55 kg
@ Rp. 6,000.00
Batu Apung
0.37 kg
@ Rp. 4,000.00
Upah :
1.0000 m2 @ Rp. 18,562.50 Total
D
PEKERJAAN BETON BERTULANG
1.
1M3 PEKERJAAN COR BETON UNTUK SLOOF, SKELET DAN RING BALOK; DGN M Bahan : Semen (pc) 8.5150
zak @ Rp. 22,000.00
Pasir Beton 0.5450
m3 @ Rp. 50,000.00
Kerikil 0.8174
m3 @ Rp. 50,000.00
Upah :
1 m3 @ Rp. 47,250.00 Total
2 1Kg. PEMBESIAN U-24 (Alat Gunting) Bahan : Besi Beton 1.1000 kg @ Rp. 4,500.00 Bendrat (kawat beton) 0.0200 kg @ Rp. 8,000.00
Upah :
1.0000 m3 @ Rp. 428.88 Total
3 1M2 PEKERJAAN BEKESTING UNTUK SKELET, SLOOF DAN RING BALOK DENGAN PAPAN SENGON Bahan :
. = Rp.
1,650.00
. = Rp.
3,300.00
. = Rp. . = Rp.
1,466.80 6,416.80
. = Rp. . = Rp.
18,562.50 24,979.30
RING BALOK; DGN MOLEN
F DAN RING BALOK
. = Rp.
187329.7
. = Rp.
27247.96
. = Rp.
40871.93
. = Rp.
255449.59
. = Rp.
47250
. = Rp.
302699.59
. = Rp.
4950
. = Rp.
160
. = Rp.
5110
. = Rp.
428.88
. = Rp.
5538.88
Papan sengon Paku
Upah :
2.7500 lbr @ Rp. 3,000.00 0.2000 kg @ Rp. 7,000.00
1.0000 m2 @ Rp. 1,750.00
1 LS PERANCAH BETON DARI BAMBU UNTUK 1M3 PLAT TEBAL 4 12 CM Rangka (0,6 x 0,6) m. Bahan : Balok Kayu/ Bambu 55.0000 btg @ Rp. 4,500.00 Paku
Upah :
1.6600 kg @ Rp. 7,000.00
1
ls
@ Rp. 24,990.00
1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK 5 SLOOF 15/20 (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton
1.0000 m3 @ Rp. 302,699.59
Besi Beton U-24 100.0000 kg @ Rp. 5,538.88 Bekesting
5.0000 m2 @ Rp. 11,400.00
6 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SKELET 15/15 (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton 1.0000 m3 @ Rp. 302,699.59 Besi Beton U-24 120.0000 kg
Total
. = Rp.
8250
. = Rp.
1400
. = Rp.
9650
. = Rp.
1750
. = Rp.
11400
. = Rp.
247500
. = Rp.
11620
. = Rp.
259120
. = Rp.
24990
. = Rp.
284110
. = Rp.
302699.59
. = Rp.
553887.5
. = Rp.
57000
. = Rp.
913587.09
. = Rp. . = Rp.
302699.59
AT TEBAL
@ Rp. 24,990.00 Total
Total
NTUK SKELET 15/15
@ Rp. 5,538.88 Bekesting 5.0000 m2 @ Rp. 11,400.00
7 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK BALOK RING 1 (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton
1.0000 m3 @ Rp. 302,699.59
Besi Beton U-24 120.0000 kg @ Rp. 5,538.88 Bekesting 5.0000 m2 @ Rp. 11,400.00
1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK 8 CANOPY (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton
1.0000 m3 @ Rp. 302,699.59
Besi Beton U-24 125.0000 kg @ Rp. 5,538.88 Bekesting 5.0000 m2 @ Rp. 11,400.00 Perancah Bambu M
0.5000 ls @ Rp. 284,110.00
PEKERJAAN SANITASI DAN DRAINASI 1 1 M' PEKERJAAN INSTALASI AIR BERSIH Bahan : Pipa PVC 3/4\"
0.28
Sock
0.28
Knee
0.19
Lem PC
0.1
664665
Total
. = Rp.
57000
. = Rp.
1,024,364.59
. = Rp.
302699.59
. = Rp.
664665
. = Rp.
57000
. = Rp.
1,024,364.59
. = Rp.
302699.59
. = Rp.
692359.38
. = Rp.
57000
. = Rp.
142055
. = Rp.
1,194,113.97
NTUK BALOK RING 15/15
Total
Total
btg
@ Rp.
14,000.00
. = Rp.
3,850.00
bh
@ Rp.
2,000.00
. = Rp.
550.00
bh
@ Rp.
2,500.00
. = Rp.
468.75
tube
@ Rp.
3,500.00
. = Rp. . = Rp.
350.00 5,218.75
3,850.00 550.00 468.75 350.00 5,218.75
Upah :
1
m'
2 1 M' PEKERJAAN INSTALASI AIR KOTOR DAN AIR BEKAS Bahan : Pipa PVC 3\"
0.28
btg
Sock
0.28
bh
Knee
0.19
bh
Lem PVC Upah :
0.2 1
tube m'
3 1 UNIT PEKERJAAN PASANG CLOSET DUDUK Bahan : Closet Duduk Monoblok Upah :
1
set
1
unit
4 1 UNIT PEKERJAAN PASANG CLOSET JONGKOK Bahan : Closet Jongkok
1
bh
Dudukan closet
1
ls
Upah :
1
unit
5 1 UNIT PEKERJAAN PASANG WASHTAFEL Bahan : Washtafel
1
set
@ Rp.
2,500.00 Total
. = Rp. . = Rp.
2,500.00 7,718.75
@ Rp.
85,000.00
. = Rp.
23,375.00
@ Rp.
5,000.00
. = Rp.
1,375.00
@ Rp.
7,800.00
. = Rp.
1,462.50
@ Rp.
3,500.00
. = Rp. . = Rp.
700.00 26,912.50
@ Rp.
5,000.00
. = Rp. . = Rp.
5,000.00 31,912.50
Total
@ Rp.
1,000,000.00
. = Rp. . = Rp.
1,000,000.00 1,000,000.00
@ Rp.
72,600.00
. = Rp.
72,600.00
. = Rp.
1,072,600.00
Total
@ Rp.
74,500.00
. = Rp.
74,500.00
@ Rp.
25,000.00
. = Rp. . = Rp.
25,000.00 99,500.00
@ Rp.
36,300.00
. = Rp. . = Rp.
36,300.00 135,800.00
. = Rp.
200,000.00
Total
@ Rp.
200,000.00
Upah :
1
unit
6 1 UNIT PEKERJAAN PASANG WALL SHOWER Bahan : Wallshower Upah :
1
set
1
unit
7 1 BH PEKERJAAN PASANG FLOOR DRAIN Bahan : Floordrain 1.0000
Upah :
bh
@ Rp. 10,000.00
1 unit
@ Rp. 9,000.00
1 BH PEKERJAAN PASANG AVOR (KURASAN 8 BAK) Bahan : Avor 1.0000
Upah :
bh
@ Rp. 5,000.00
1 unit
@ Rp. 9,000.00
bh
@ Rp. 15,000.00
bh
@ Rp. 2,500.00
1 BH PEKERJAAN KERAN 9 AIR Bahan : Keran Air (rata-rata) 1.0000 Knee 1.0000
@ Rp.
72,600.00 Total
. = Rp.
200,000.00
. = Rp. . = Rp.
72,600.00 272,600.00
@ Rp.
50,000.00
. = Rp. . = Rp.
50,000.00 50,000.00
@ Rp.
15,125.00
. = Rp. . = Rp.
15,125.00 65,125.00
Total
@ Rp. 10,000.00
. = Rp.
10000
. = Rp.
10000
. = Rp.
9000
. = Rp.
19000
. = Rp.
5000
. = Rp.
5000
. = Rp.
9000
. = Rp.
14000
@ Rp. 15,000.00
. = Rp.
15000
@ Rp. 2,500.00
. = Rp.
2500
@ Rp. 9,000.00 Total
@ Rp. 5,000.00
@ Rp. 9,000.00 Total
Isolasi 1.0000
Upah :
bh
@ Rp. 1,000.00
1 m'
@ Rp. 3,600.00
1 BH PEKERJAAN KERAN AIR UNTUK 10 DAPUR Bahan : Keran Air (rata-rata) 1.0000
bh
@ Rp. 25,000.00
Knee 1.0000
bh
@ Rp. 2,500.00
Isolasi 1.0000
bh
@ Rp. 1,000.00
1 m'
@ Rp. 3,600.00
Upah :
1 BH PEKERJAAN PASANG SOAP HOLDER 11 TANAM Bahan : Soap Holder 1.0000
Upah :
bh
@ Rp. 25,000.00
1 unit
@ Rp. 15,125.00
1 UNIT PEKERJAAN PASANG BATH 12 UP Bahan : Bath Up 1.0000
set
@ Rp. 1,250,000.00
@ Rp. 1,000.00
. = Rp.
1000
. = Rp.
18500
. = Rp.
3600
. = Rp.
22100
@ Rp. 25,000.00
. = Rp.
25000
@ Rp. 2,500.00
. = Rp.
2500
@ Rp. 1,000.00
. = Rp.
1000
. = Rp.
28500
. = Rp.
3600
. = Rp.
32100
. = Rp.
25000
. = Rp.
25000
. = Rp.
15125
. = Rp.
40125
@ Rp. 3,600.00 Total
@ Rp. 3,600.00 Total
@ Rp. 25,000.00
@ Rp. 15,125.00
@ Rp. 1,250,000.00
Total
. = Rp.
1,250,000.00
. = Rp.
1,250,000.00
Upah :
1 unit
@ Rp. 93,750.00 Total
1 UNIT PEKERJAAN BIKIN BAK 13 KONTROL Bahan : Bak Kontrol 1.0000
Upah :
unit
1 ls
@ Rp. 200,000.00
@ Rp. 52,000.00 Total
14 1 UNIT PEKERJAAN SUMUR RESAPAN DENGAN BUIS BETON Bahan : Sumur Resapan 1.0000
Upah :
unit
1 ls
@ Rp. 750,000.00
@ Rp. 100,000.00 Total
15 1 UNIT PEKERJAAN SEPTIC TANK Bahan : Septictank 1.0000
Upah :
unit
1 ls
@ Rp. 1,500,000.00
@ Rp. 350,000.00 Total
16 1 UNIT PEKERJAAN INSTALASI SUMUR AIR BERSIH + POMPA Bahan + Upah
@ Rp. 93,750.00
@ Rp. 200,000.00
@ Rp. 52,000.00
@ Rp. 750,000.00
@ Rp. 100,000.00
@ Rp. 1,500,000.00
@ Rp. 350,000.00
. = Rp.
93750
. = Rp.
1,343,750.00
. = Rp.
200000
. = Rp.
200000
. = Rp.
52000
. = Rp.
252000
. = Rp.
750000
. = Rp.
750000
. = Rp.
100000
. = Rp.
850000
. = Rp.
1,500,000.00
. = Rp.
1,500,000.00
. = Rp.
350000
. = Rp.
1,850,000.00
Instalasi sumur air bersih + pompa 1.0000 unit
@ Rp. 1,000,000.00
. = Rp.
@ Rp. 1,000,000.00
. = Rp.
1 UNIT PEKERJAAN INSTALASI WATER 17 TORN Bahan + Upah Instalasi water torn 1.0000 unit M
PEKERJAAN PERKERASAN JALAN 1 1M2 PEKERJAAN PERKERASAN JALAN DENGAN PAVING BLOK (Dengan 2 lapis pondasi) Bahan : Paving Blok1.1000 m2 @
Rp.
14,000.00
Pasir Beton0.1200 m3 @
Rp.
50,000.00
Sirtu
0.1200 m3 @
Rp.
30,000.00
Pasir urug 0.1350 m3 @
Rp.
27,000.00
Batu Belah 0.3000 m3 @
Rp.
35,000.00
Upah :
Rp.
10,725.00
1.0000 m2 @
1M' PEKERJAAN KANSTEN 2 (25x25x40) CM Bahan : Kansten
1.1000 m' @
Rp.
27,400.00
Pasir Beton0.0300 m3 @
Rp.
50,000.00
Sirtu
0.0300 m3 @
Rp.
30,000.00
Pasir urug 0.0297 m3 @
Rp.
27,000.00
000,000.00
000,000.00
. = Rp. Total
1,000,000.00
. = Rp.
1,000,000.00
. = Rp.
1,000,000.00
Total
. = Rp.
Total
.= Rp. .= Rp. .= Rp. .= Rp. .= Rp. .= Rp. .= Rp. .= Rp.
1,000,000.00
ING BLOK
.= Rp. .= Rp. .= Rp. .= Rp.
15,400.00 6,000.00 3,600.00 3,645.00 10,500.00 39,145.00 10,725.00 49,870.00
30,140.00 1,500.00 900.00 801.90
O
Batu Belah 0.0660 m3 @
Rp.
35,000.00
Upah :
Rp.
3,431.25
1.0000 m2 @
PEKERJAAN PEMBERSIHAN AKHIR PROYEK 1 LS PEMBERSIHAN AKHIR 1 PROYEK Upah :
1.00
DAFTAR ANALISIS
ls.
@
Rp.
200,000.00
Total
.= Rp. .= Rp. .= Rp. .= Rp.
.= Rp.
2,310.00 35,651.90 3,431.25 39,083.15
200,000.00
HARGA SATUAN PEKERJAAN (HSP) - DENGAN OVER HEAD PROYEK : SAMPLE LOKASI : SAMPLE
A 1.
PEKERJAAN PERSIAPAN MOBILISASI Upah :
1
ls.
@ Rp. 200,000.00
1
m2
@ Rp. 3,189.56
Papan Sengon 0.5500
Lbr
@ Rp. 3,000.00
Balok Kayu 0.0060
m3
@ Rp. 1,200,000.00
Paku 0.0200
Kg.
@ Rp. 7,000.00
1M2 PEMBERSIHAN LOKASI 2. PROYEK Upah : 1 M' PEKERJAAN UITZET & 3. BOUWPLANK Bahan :
Upah :
4.
1
M`
@ Rp. 3,986.95
Zeng 1.2500
Lbr
@ Rp. 8,000.00
Balok Kayu 0.0300
m3
@ Rp. 1,200,000.00
.=
1 M' PEMAGARAN LOKASI PROYEK Bahan :
Paku Zeng 12.5000 Paku 0.0200
bh.
@ Rp. 150.00 Kg.
@ Rp. 7,000.00
.=
. = Rp.
200,000.00
. = Rp.
3,189.56
. = Rp.
1,650.00
p. 1,200,000.00
. = Rp.
7,200.00
. = Rp. . = Rp.
140.00 8,990.00
. = Rp. Total . = Rp.
3,986.95 12,976.95
. = Rp.
10,000.00
p. 1,200,000.00
. = Rp.
36,000.00
. = Rp.
1,875.00
. = Rp. . = Rp.
140.00 48,015.00
Upah :
1 M`
@ Rp. 6,644.91
1 M2
@ Rp. 100,000.00
1 M2 PEKERJAAN DIREKSI 5. KIT Bahan & Upah :
1 M2 PEKERJAAN PEMBUATAN BRAK UNTUK 6. GUDANG Bahan & Upah :
7.
1 m2
@ Rp. 100,000.00
ADMINISTRASI DAN DOKUMENTASI Bahan & Upah : PEKERJAAN TANAH DAN PASIR
B
1 ls.
@ Rp. 150,000.00
1 M3 PEKERJAAN GALIAN 1. TANAH BIASA Untuk Pondasi Batu Kali Upah :
1
m3 @ Rp. 11,296.35
1 M3 PEKERJAAN GALIAN TANAH s.d. 2. -2 M Untuk Foot Plate Upah :
1
m3 @ Rp. 13,289.82
1 M3 PEKERJAAN URUGAN TANAH 3. KEMBALI Upah : *) *). Termasuk Pemadatan 4.
1 M3 PEKERJAAN URUGAN
1
m3 @ Rp. 5,980.42
. = Rp. Total . = Rp.
6,644.91 54,659.91
. = Rp.
100,000.00
. = Rp.
100,000.00
. = Rp.
150,000.00
. = Rp. Total
11296.35 . = Rp.
. = Rp. Total
13289.82 . = Rp.
. = Rp. Total
11296.35
13289.82
5980.42 . = Rp.
5980.42
TANAH Dengan Mendatangkan Tanah dari Luar Bahan : Tanah Urug 1.2000 Upah : *)
m3 @ Rp. 22,500.00 1
m3 @ Rp. 8,638.38
*). Termasuk Pemadatan 1 M3 PEKERJAAN URUGAN 5. PASIR Bahan : Pasir 1.2000
m3 @ Rp. 27,000.00
Upah :
1
m3 @ Rp. 6,578.46
1 M2 PEKERJAAN URUGAN 6. PASIR TEBAL = 10 CM` Bahan : Pasir 0.1200
m3 @ Rp. 27,000.00
Upah : C 1.
1
m3 @ Rp. 1,461.88
PEKERJAAN PASANGAN & PLESTERAN 1 M3 PEKERJAAN PASANGAN PONDASI BATU KALI PECAH ( 1 PC : 6 PS ) Bahan : Batu Kali
1.2000 m3 @ Rp. 35,000.00
Semen (pc)
3.0698 zak @ Rp. 22,000.00
Kapur Pasir Pasang
-
zak @ Rp. 4,500.00 0.6175
. = Rp.
27000
. = Rp.
8638.38
Total
. = Rp.
35638.38
. = Rp.
32400
. = Rp.
6578.46
Total
. = Rp.
38978.46
. = Rp.
3240
. = Rp.
1461.88
Total
. = Rp.
4701.88
1 PC : 6 PS )
. = Rp.
42000
. = Rp.
67535.08
. = Rp. . = Rp.
-
m3 @ Rp. 50,000.00
Upah :
1.0000 m3 @ Rp. 50,002.95 Total :
1 M3 PEKERJAAN PASANGAN BATU KALI 2. KOSONG Bahan : Batu Kali
1.2000 m3 @ Rp. 35,000.00
Pasir Pasang
Upah :
0.4500 m3 @ Rp. 27,000.00
1.0000 m3 @ Rp. 31,895.57 Total :
1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU TRASRAM (1 3. PC : 3 PS) Bahan : Batu Bata
77.0000
Semen (pc) Kapur Pasir Pasang (Ayak)
bh @ Rp. 180.00
0.6077 zak @ Rp. 22,000.00
zak -@ Rp. 4,500.00
0.0611 m3 @ Rp. 50,000.00
Upah :
1.0000 m2 @ Rp. 10,764.76 Total
4.
1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU (1 PC : 5 PS) Bahan : Batu Bata
70.0000
bh @ Rp. 180.00
30873.18 . = Rp.
140408.26
. = Rp.
50002.95
. = Rp.
190411.22
. = Rp.
42000
. = Rp.
12150
. = Rp.
54150
. = Rp.
31895.57
. = Rp.
86045.57
. = Rp.
13860
. = Rp.
13369.32
. = Rp.
-
. = Rp.
3055.84
. = Rp.
30285.16
. = Rp.
10764.76
. = Rp.
41049.92
. = Rp.
12600
Semen (pc)
0.4093 zak @ Rp. 22,000.00
Kapur
-
zak @ Rp. 4,500.00
Pasir Pasang (Ayak)
Upah :
0.0686 m3 @ Rp. 50,000.00
1.0000 m2 @ Rp. 9,718.18
1 M' PEKERJAAN ROLLAG BATA (1 PC 5. : 3 PS) Bahan : Batu Bata Semen (pc)
14.0000
0.2263 zak @ Rp. 22,000.00
Pasir Pasang (Ayak)
Upah :
6.
bh @ Rp. 180.00
0.0122 m3 @ Rp. 50,000.00
1.0000
m' @ Rp. 5,232.87
1 M2 PEKERJAAN PLESTERAN (1PC : 5 PS) T = 20 MM
Bahan : Semen (pc)
zak @ Rp. 22,000.00 . = Rp. 0.14 Kapur - zak @ Rp. 4,500.00 . = Rp. Pasir Pasang (Ayak) m3 @ Rp. 50,000.00 . = Rp. 0.02 Upah :
m2
@ Rp.
12,133.61 . = Rp.
1 7. 1 M2 PEKERJAAN PLESTERAN TRASRAM (1 PC : 3 PS) T = 20 MM Bahan : Semen (pc) 0.21
. = Rp.
9004.49
. = Rp.
Total
Total
-
. = Rp.
3430.28
. = Rp.
25034.77
. = Rp.
9718.18
. = Rp.
34752.95
. = Rp.
2520
. = Rp.
4978.82
. = Rp.
611.68
. = Rp.
8110.51
. = Rp.
5232.87
. = Rp.
13343.37
3,142.38
1,197.10
. = Rp.
Total
4,339.48 12,133.61
. = Rp.
16,473.09
zak @ Rp.
. = Rp. 22000
4665.62
Kapur
- zak @ Rp.
4,500.00 . = Rp.
Pasir Pasang (Ayak) 0.02
Upah : 1
8. 1 M2 PEKERJAAN PLESTERAN UNTUK BETON (1 Bahan : Semen (pc) Kapur
- zak @ Rp.
0.09 4,500.00 . = Rp.
Pasir Pasang (Ayak) 0.01
Upah : 1
9. 1 M' PEKERJAAN SPONENGAN SUDUT ( 1 PC : 2 PS ) Bahan : Semen (pc) Kapur (Mill)
- zak @ Rp.
0.02 4,500.00 . = R
Pasir Pasang (Ayak) 0
Upah : 1
10. 1 M2 PEKERJAAN PENEBALAN PLESTERAN TYP
4,500.00 . = Rp. m3 @ Rp. . = Rp. 50000 . = Rp.
1066.43 5732.05
m2 @ Rp. . = Rp. 12133.61 Total . = Rp.
12133.61 17865.65
N UNTUK BETON (1 PC : 3 PS) T = 6 MM zak @ Rp. . = Rp. 22000 4,500.00 . = Rp.
2073.61 -
m3 @ Rp. . = Rp. 50000
473.97
. = Rp. 2547.58 m2 @ Rp. . = Rp. 12133.61 Total . = Rp.
12133.61 14681.18
N SUDUT ( 1 PC :
zak @ Rp. . = Rp. 22000 4,500.00 . = Rp.
547.39 -
m3 @ Rp. . = Rp. 50000 . = Rp.
83.41 630.81
m2 @ Rp.
3,654.70 . = Rp. 3654.7
Total
AN PLESTERAN TYPE A
. = Rp. 4285.51
Bahan : Semen (pc) 0.01 Pasir Pasang (Ayak) 0
Upah : 1
11. 1 M2 PEKERJAAN PENEBALAN PLESTERAN TYP Bahan : Semen (pc) 0.01 Pasir Pasang (Ayak) 0
Upah : 1
12. 1 M2 PEKERJAAN LANTAI KERJA ( 1PC : 4 PS) T Bahan : Semen (pc) 0.34 Pasir Pasang (Ayak) 0.05
Upah : 1
13. 1 M2 PEKERJAAN LANTAI KERJA ( 1 PC : 3 PS : Bahan : Semen (pc) 0.3 Pasir 0.03
zak @ Rp. . = Rp. 22000 m3 @ Rp. . = Rp. 50000 . = Rp.
157.12 59.85 216.97
m2 @ Rp. . = Rp. 10964.1 Total . = Rp.
10964.1 11181.08
AN PLESTERAN TYPE B zak @ Rp. . = Rp. 22000 m3 @ Rp. . = Rp. 50000
251.39 95.77
. = Rp. 347.16 m2 @ Rp. . = Rp. 10964.1 Total . = Rp.
10964.1 11311.26
ERJA ( 1PC : 4 PS) TEBAL 30 MM zak @ Rp. . = Rp. 22000 m3 @ Rp. . = Rp. 50000 . = Rp.
7510.84 2289.02 9799.86
m2 @ Rp.
4,385.64 . = Rp. 4385.64
Total
. = Rp. 14185.5
ERJA ( 1 PC : 3 PS : 5 KR) TEBAL 50 MM zak @ Rp. . = Rp. 22000 m3 @ Rp. . = Rp. 50000
6702.65 1462.4
Krikil 0.03
Upah : 1
E
PEKERJAAN PENUTUP LANTAI DAN DINDING
1. 1M2 PEKERJAAN PASANGAN KERAMIK LANTAI 3 Bahan : Keramik Lantai 1.1 Semen (pc) 0.17 Pasir 0.02 Semen Grouting 0.18
Upah : 1
2. 1M2 PEKERJAAN PASANGAN KERAMIK KM/ WC Bahan : Keramik Serit 1.1 Semen (pc) 0.17 Pasir 0.02 Semen Grouting 0.18
Upah : 1
m3 @ Rp. . = Rp. 50000 . = Rp.
1327.76 9492.8
m2 @ Rp.
7,601.78 . = Rp. 7601.78
Total
. = Rp. 17094.58
I DAN DINDING
N KERAMIK LANTAI 30/30
m2 @ Rp. 30000 zak @ Rp. 22000 m3 @ Rp. 50000 m3 @ Rp.
. = Rp. 33000 . = Rp. 3805.49 . = Rp. 1030.06 7,500.00 . = Rp. 1375 . = Rp. 39210.55
m2 @ Rp. . = Rp. 12293.08 Total . = Rp.
12293.08 51503.63
N KERAMIK KM/ WC 20X20 CM m2 @ Rp. . = Rp. 35000 zak @ Rp. . = Rp. 22000 m3 @ Rp. . = Rp. 50000 m3 @ Rp. 7,500.00 . = Rp.
38500 3805.49 1030.06 1375
. = Rp. 44710.55 m2 @ Rp. . = Rp. 12293.08 Total . = Rp.
12293.08 57003.63
3. 1M2 PEKERJAAN PASANGAN KERAMIK DINDING Bahan : Keramik Dinding 1.1 Semen (pc) 0.13 Pasir 0.02 Semen Grouting 0.18
Upah : 1
4. 1M' PEKERJAAN PASANGAN KERAMIK PLINT T = 12 CM Bahan : Keramik Dinding 0.17 Semen (pc) 0.02 Pasir 0 Semen Grouting 0.02
Upah : 1
5. 1 BH PEKERJAAN PASANGAN KERAMIK ASSESO Bahan : Keramik Assesories 1.1 Semen (pc) 0 Pasir 0
N KERAMIK DINDING ASIA 20X25 m2 @ Rp. 33000 zak @ Rp. 22000 m3 @ Rp. 50000 m3 @ Rp.
. = Rp. 36300 . = Rp. 2854.12 . = Rp. 772.54 7,500.00 . = Rp. 1375 . = Rp. 41301.66
m2 @ Rp. . = Rp. 39869.46 Total . = Rp.
39869.46 81171.13
KERAMIK
m2 @ Rp. 30000 zak @ Rp. 22000 m3 @ Rp. 50000 m3 @ Rp.
. = Rp. 5001 . = Rp. 342.49 . = Rp. 92.71 7,500.00 . = Rp. 165 . = Rp. 5601.2
m2 @ Rp.
9,037.08 . = Rp. 9037.08
Total . = Rp. 14638.28
N KERAMIK ASSESORIES (8 X 20) CM bh
@ Rp.
4,000.00 . = Rp. 4400
zak @ Rp. . = Rp. 22000 m3 @ Rp. . = Rp. 50000
45.67 12.36
Semen Grouting
Upah :
1M2 PEKERJAAN BATU ALAM PADA 6. DINDING Bahan : Batu Alam Semen (pc) Pasir
1.1200 0.1297
0.0155
Upah :
7.
1
1M2 PEKERJAAN BATU ALAM SUSUN SIRIH PAD Bahan : Batu Belah
275.0000
Semen (pc)
0.1297
Pasir
Upah : G
0.0155
1
PEKERJAAN RANGKA ATAP & PLAFOND
1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2 1. KRUING (Jarak Usuk 40; Jarak Reng 36 cm) Bahan :
m3 @ Rp.
7,500.00 . = Rp.
0
22 . = Rp. 4480.03 m2 @ Rp.
1,328.98 . = Rp.
1
1328.98 Total . = Rp. 5809.01
1.1200 0.1297
m2
@ Rp. 65,000.00 . = Rp.
72800
zak @ Rp. 22,000.00 . = Rp. m3
m2
2,854.12
@ Rp. 50,000.00 . = Rp.
772.54
. = Rp.
76426.66
@ Rp. 59,804.19 . = Rp.
59804.19
Total
. = Rp.
136230.86
M SUSUN SIRIH PADA PILAR
275.0000 0.1297
bh
@ Rp. 500.00 . = Rp.
137500
zak @ Rp. 22,000.00 . = Rp. m3
m2
@ Rp. 50,000.00 . = Rp.
BANGKIRAI RENG 2/3 KY.
772.54
. = Rp.
141126.66
@ Rp. 39,869.46 . = Rp.
39869.46
Total PLAFOND
2,854.12
. = Rp.
180996.13
Balok Kayu 0.0092 Reng Kayu 0.0045 Paku 0.2000
Upah :
1
1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. 2. KRUING (Jarak Usuk 45 cm; Jarak Reng 35 cm) Bahan : Balok Kayu 0.0092 Reng Kayu 0.0064 Paku 0.2000
Upah :
1
1 M3 PEKERJAAN GORDING, NOG, JURAI, MURPLATE. KAYU B 3. 8/12 Bahan : Balok Kayu 1.1000 Baut 50.0833
Upah :
bh @ Rp. 1,500.00
1
m3 @ Rp. 2,800,000.00
. = Rp.
25872
Kg @ Rp. 1,800,000.00
. = Rp.
8188.71
Kg @ Rp. 7,000.00
M2 @ Rp. 5,315.93 Total :
. = Rp.
1400
. = Rp.
35460.71
. = Rp.
5315.93
. = Rp.
40776.64
I RENG 2/3 KY.
m3 @ Rp. 2,800,000.00
. = Rp.
25872
Kg @ Rp. 1,800,000.00
. = Rp.
11583
Kg @ Rp. 7,000.00
M2 @ Rp. 5,315.93 Total :
. = Rp.
1400
. = Rp.
38855
. = Rp.
5315.93
. = Rp.
44170.93
MURPLATE. KAYU BANGKIRAI
m3 @ Rp. 2,800,000.00
. = Rp.
Rp. 1,500.00
m3 @ Rp. 571,462.31 Total :
3,080,000.00
. = Rp.
75125
. = Rp.
3,155,125.00
. = Rp.
571462.31
. = Rp.
3,726,587.31
1 M` PEKERJAAN PAPAN RUITER KAYU 4. BANGKIRAI 2/20 Bahan : Papan Kayu 0.0044 Paku 0.0200
Upah :
1
1 M` PEKERJAAN PAPAN LISJPLANK TUNGGAL KAY 5. BANGKIRAI 2/25 Bahan : Papan Kayu 0.0055 Paku 0.0200
Upah :
1
1 M` PEKERJAAN PAPAN LISJPLANK DOUBLE KAYU 6. 2/25 Bahan : Papan Kayu 0.0110 Paku 0.0400
Upah :
7.
1
1M' PEKERJAAN TALANG ZENG; PAPAN KAYU
m3 @ Rp. 3,000,000.00
. = Rp.
bh @ Rp.. =7,000.00 Rp.
140
. = Rp.
13340
m` @ Rp.. =1,993.47 Rp. Total :
13200
1993.47
. = Rp.
15333.47
ANK TUNGGAL KAYU
m3 @ Rp. 3,000,000.00
. = Rp.
bh @ Rp.. =7,000.00 Rp.
140
. = Rp.
16640
m` @ Rp.. =9,635.12 Rp. Total :
16500
9635.12
. = Rp.
26275.12
ANK DOUBLE KAYU BANGKIRAI 2/20;
m3 @ Rp. 3,000,000.00 bh @ Rp.. =7,000.00 Rp. . = Rp.
. = Rp.
33000 280 33280
m` @ Rp.. =19,270.24 Rp.
19270.24
Total :
52550.24
NG; PAPAN KAYU
. = Rp.
MERANTI Bahan : Seng BJLS 30 1.1000 Papan Kayu Meranti 0.0176
Paku Seng (Payung) 10.0000 b Paku 0.0200
Upah :
1 M' PEKERJAAN WENVIR 8. DENGAN SENG Bahan : Seng Papan Kayu Meranti Paku
Upah :
1 M2 PEKERJAAN RANGKA PLAFOND KY KRUING - P 9. GYPSUM Rangka = 60 x 60 CM Bahan : Gypsum 0.3819 Balok Kayu 0.0136 Paku 0.2000 Paku Plepet
30 1.1000 Meranti 0.0176
m' @ Rp. 24,000.00. = Rp.
26400
m3 @ Rp. 1,400,000.00
24640
Payung) 10.0000 buah @ Rp. 150.00
Paku 0.0200
. = Rp.
. = Rp.
1500
kg @ Rp. 7,000.00 . = Rp.
140
. = Rp.
52680
@ Rp. 10,299.61 . = Rp.
10299.61
1 m'
Total
1.1 m' 0 m3 0.02 kg
1 m'
. = Rp.
@ Rp. 8,000.00 . = Rp.
62979.61
8800
@ Rp. 1,400,000.00
. = Rp.
3640
@ Rp. 7,000.00 . = Rp.
140
. = Rp.
12580
@ Rp. 6,644.91 . = Rp.
6644.91
Total
. = Rp.
19224.91
FOND KY KRUING - PENUTUP
Gypsum 0.3819
Paku 0.2000
m3 @ Rp. 35,000.00. = Rp. m3 @ Rp. 1,800,000.00
. = Rp.
Kg @ Rp. 7,000.00 . = Rp. Kg . = Rp.
13368.06 24552 1400
Upah :
1 M2 PEKERJAAN RANGKA PLAFOND - PE 10. CALSIBOARD Rangka = 100 x 100 CM Bahan : Calsiboard 0.3819 Balok Kayu 0.0092 Paku 0.2000 Paku Plepet 0.0200
Upah :
11 1 M' PEKERJAAN LIS GYPSIUM LEBAR : 10 CM Bahan dan Upah : Lis Gypsium L=10 cm 1.0000 H 1.
PEKERJAAN PENUTUP ATAP
1 M2 PEKERJAAN PENUTUP ATAP GENTENG KERAMIK SO Bahan : Genteng Keramik
9.9000
0.02 @ Rp. 8,000.00
160 . = Rp.
39480.06
. = Rp.
17276.77
Total :
. = Rp.
56756.82
Calsiboard 0.3819
m3 @ Rp. 30,000.00
. = Rp.
11458.33
Balok Kayu 0.0092
m3 @ Rp. 1,800,000.00
Paku 0.2000
Kg @ Rp. 7,000.00
. = Rp.
1400
Paku Plepet 0.0200
Kg @ Rp. 8,000.00
. = Rp.
160
. = Rp.
29650.33
. = Rp.
9568.67
Total :
. = Rp.
39219
m3 m' Rp. 8,000.00
. = Rp.
8000
Total :
. = Rp.
8000
. = Rp.
20790
. = Rp.
20790
1 m2 @ Rp. 17,276.77
NGKA PLAFOND - PENUTUP
1 m2 @ Rp. 9,568.67
. = Rp.
16632
UM LEBAR : 10 CM
L=10 cm 1.0000
TENG KERAMIK SOKKA TYPE MORANDO SE
ramik
9.9000
bh @ Rp.
2,100.00
Upah :
1
1 M' PEKERJAAN KERPUS GENTENG KERAMIK 2. SOKKA Bahan : Genteng Kerpus Semen Pasir
3.3000
0.2601 0.0366
Upah :
F
1
PEKERJAAN KUSEN DAN DAUN PINTU JENDELA
1 1 M3 PEKERJAAN KUSEN KAYU JATI KELAS POLITU Bahan : Balok Kayu Paku
1.1000
5.0000
Upah : 2.
1
1 M' PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12 Bahan : Balok Kayu Paku Upah :
0.0087
0.0360 1
m2 @ Rp.
9,369.32
Total :
. = Rp.
9369.32
. = Rp.
30159.32
ENG KERAMIK
m3 @ Rp.
4,000.00
. = Rp.
13200
m3 @ Rp.
22,000.00
. = Rp.
5722.54
Kg @ Rp.
50,000.00
. = Rp.
1831.21
. = Rp.
20753.76
. = Rp.
22642.53
. = Rp.
43396.29
m2 @ Rp.
22,642.53
Total :
PINTU JENDELA
JATI KELAS POLITUR 6/12
m3 @
Rp.
Kg @
Rp.
m3 @
Rp.
6,000,000.00 7,000.00 2,299,139.05 Total :
. = Rp.
6,600,000.00
. = Rp. . = Rp.
35,000.00 6,635,000.00
. = Rp. . = Rp.
2,299,139.05 8,934,139.05
. = Rp.
52,272.00
ELAS POLITUR 6/12
m3 @
Rp.
6,000,000.00
Kg @
Rp.
7,000.00
. = Rp. . = Rp.
252.00 52,524.00
m' @
Rp.
16,553.80
. = Rp. . = Rp.
16,553.80 69,077.80
Total :
6,600,000.00 35,000.00 6,635,000.00 2,299,139.05 8,934,139.05
52,272.00 252.00 52,524.00 16,553.80 69,077.80
1 M3 PEKERJAAN KREPYAK KAYU JATI UNTUK 3. KUSEN Bahan : Papan Kayu Paku
1.1000
5.0000
Upah :
1
1 BH DAUN PINTU PANIL 3,5 X 82 X 200 4. CM Bahan : Papan Kayu Lem
0.0631
0.1500
Upah :
1
1 BH DAUN PINTU PANIL 3 X 74 X 5. 200 CM Bahan : Papan Kayu Lem
0.0488
0.1500
Upah :
1
1 BH DAUN PINTU PANIL 3 X 61 X 6. 200 CM Bahan : Papan Kayu Lem
0.1500
0.0403
m3 @
Rp.
Kg @
Rp.
m3 @
Rp.
8,000,000.00 7,000.00 2,152,951.02 Total :
8,000,000.00
. = Rp.
8,800,000.00
. = Rp. . = Rp.
35,000.00 8,835,000.00
. = Rp. . = Rp.
2,152,951.02 10,987,951.02
. = Rp.
504,800.00
m3 @
Rp.
Kg @
Rp.
8,000.00
. = Rp. . = Rp.
1,200.00 506,000.00
bh @
Rp.
245,516.15
. = Rp. . = Rp.
245,516.15 751,516.15
. = Rp.
390,400.00
Total :
m3 @
Rp.
8,000,000.00
Kg @
Rp.
8,000.00
. = Rp. . = Rp.
1,200.00 391,600.00
bh @
Rp.
237,914.38
. = Rp. . = Rp.
237,914.38 629,514.38
. = Rp.
322,400.00
. = Rp.
1,200.00
Total :
m3 @
Rp.
Kg @
Rp.
8,000,000.00 8,000.00
Upah :
1
7 1 BH DAUN JENDELA 52 X 150 CM; KAYU JATI POLITUR Bahan : Ram Kayu 3,5 cm
0.0156
Kaca Bening 5 mm
Upah :
8.
0.4725
1
1 BH DAUN JENDELA 62 X 116 CM; KAYU JATI POLITUR Bahan : Ram Kayu 3,5 cm
0.0137
Kaca Bening 5 mm
Upah :
9.
0.4500
1
1 BH DAUN JENDELA 62 X 166 CM; KAYU JATI POLITUR Bahan : Ram Kayu 3,5 cm
0.0176
Kaca Bening 5 mm
Upah :
10.
0.6750
1
1 BH ROSTER KAYU 30 X 40 CM
bh @
Rp.
233,395.84 Total :
. = Rp.
323,600.00
. = Rp. . = Rp.
233,395.84 556,995.84
m3
@
Rp.
8,000,000.00
m2
@
Rp.
60,000.00
bh
@
Rp.
93,028.75
Total :
m3
@
Rp.
8,000,000.00
m2
@
Rp.
60,000.00
bh
@
Rp.
93,028.75
Total :
m3
@
Rp.
8,000,000.00
m2
@
Rp.
60,000.00
bh
@
Rp.
93,028.75
Total :
323,600.00 233,395.84 556,995.84
.= Rp. .= Rp. .= Rp. .= Rp. .= Rp.
.= Rp. .= Rp. .= Rp. .= Rp. .= Rp.
.= Rp. .= Rp. .= Rp. .= Rp. .= Rp.
124,800.00 28,350.00 153,150.00 93,028.75 246,178.75
109,600.00 27,000.00
136,600.00 93,028.75 229,628.75
140,800.00 40,500.00 181,300.00 93,028.75 274,328.75
Bahan : Roster Kayu
1.0000
Upah :
11.
1
bh
@
bh
@
m2
@
1 M2 PEKERJAAN KACA ES UNTUK BOVEN Bahan dan Upah : Kaca Es 5mm Lis Kayu
J 1.
1.0000
4.0000
m'
@
Kg
@
Rp. 33,000.00
PEKERJAAN CAT DAN POLITUR 1 M2 PENGECATAN KAYU BARU Bahan : Cat Kayu Plamur Kayu
0.1375
Kg
@
Rp. 9,700.00
Dempul Jadi
0.5000
bh
@
Rp. 1,000.00
ltr
@
Rp. 4,500.00
lbr
@
Rp. 1,250.00
bh
@
Rp. 17,223.61
kg
@
Rp. 6,000.00
m2
@
Rp.
Thiner Amplas Upah : 2.
0.2750
0.2500 1.0000 1
1M2 PEKERJAAN MENI BIDANG KAYU BARU Bahan : Menie Jadi Upah :
0.28 1
Rp.
Rp.
45,000.00
1,328.98
Total :
Rp.
70,000.00
Rp.
3,000.00
Total :
@
Rp. 33,000.00
. = Rp.
9,075.00
@
Rp. 9,700.00
. = Rp.
1,333.75
@
Rp. 1,000.00
. = Rp.
500.00
@
Rp. 4,500.00
. = Rp.
1,125.00
@
Rp. 1,250.00
. = Rp. . = Rp.
1,250.00 13,283.75
@
Rp. 17,223.61 Total :
. = Rp. . = Rp.
17,223.61 30,507.36
@
Rp. 6,000.00
@
Rp.
. = Rp. . = Rp. . = Rp.
1,650.00 1,650.00 4,239.45
.= Rp. .= Rp. .= Rp. .= Rp.
.= Rp. .= Rp. .= Rp.
45,000.00 45,000.00 1,328.98 46,328.98
70,000.00 12,000.00 82,000.00
45,000.00 45,000.00 1,328.98 46,328.98
70,000.00 12,000.00 82,000.00
4239.45 1M2 PEKERJAAN PENGECATAN KAYU 3. BARU Bahan dan Upah: Cat-catan Menie
1 m2
@
Rp. 30,507.36
1 m2
@
Rp. 5,889.45
4. 1M2 PEKERJAAN PENGECATAN TEMBOK DGN CAT CATYLAC (Untuk Dinding dan Plafon) Bahan :
5.
Cat Tembok Catylac
0.18 kg
@
Rp. 10,000.00
Plamur Jadi
0.05 kg
@
Rp. 5,800.00
Amplas
0.25 lbr
@
Rp. 1,250.00
Upah :
1 m2
@
Rp. 6,441.41
1M2 PEKERJAAN POLITUR UNTUK KUSEN DAN DAUN PINTU DAN JENDELA Bahan : Sirlak
0.03 kg
@
Rp. 60,000.00
Spirtus
0.55 kg
@
Rp. 6,000.00
0.37 kg
@
Rp. 4,000.00
@
Rp. 24,669.23
Batu Apung Upah :
1 m2
D
PEKERJAAN BETON BERTULANG
1.
1M3 PEKERJAAN COR BETON UNTUK SLOOF, SKELET DAN RING BALOK; DGN M Bahan : Semen (pc) 8.5150
zak
Rp.
Total
. = Rp.
5,889.45
@
Rp. 30,507.36
. = Rp.
30,507.36
@
Rp. 5,889.45
. = Rp. . = Rp.
5,889.45 36,396.81
Total
@
Rp. 10,000.00
. = Rp.
1,830.00
@
Rp. 5,800.00
. = Rp.
266.80
@
Rp. 1,250.00
. = Rp. . = Rp.
312.50 2,409.30
@
Rp. 6,441.41
. = Rp. . = Rp.
6,441.41 8,850.71
Total DAN JENDELA
@
Rp. 60,000.00
. = Rp.
1,650.00
@
Rp. 6,000.00
. = Rp.
3,300.00
@
Rp. 4,000.00
. = Rp. . = Rp.
1,466.80 6,416.80
@
Rp. 24,669.23
. = Rp. . = Rp.
24,669.23 31,086.03
Total
RING BALOK; DGN MOLEN . = Rp.
187,329.70
@ Pasir Beton
0.5450 Kerikil Upah :
0.8174
m3
@
Rp. 50,000.00
m3
@
Rp. 50,000.00
1 m3
@
Rp. 62,794.40
1.1 kg
@
Rp. 4,500.00
0.02 kg
@
Rp. 8,000.00
@
Rp. 569.97
2. 1Kg. PEMBESIAN U-24 (Alat Gunting) Bahan : Besi Beton Bendrat (kawat beton) Upah :
1 m3
3. 1M2 PEKERJAAN BEKESTING UNTUK SKELET, SLOOF DAN RING BALOK DENGAN PAPAN SENGON Bahan : Papan sengon Paku Upah :
2.75 lbr
@
Rp. 3,000.00
0.2 kg
@
Rp. 7,000.00
@
Rp. 2,325.72
1 m2
4. 1 LS PERANCAH BETON DARI BAMBU UNTUK 1M3 PLAT TEBAL 12 CM Rangka (0,6 x 0,6) m. Bahan : Balok Kayu/ Bambu Paku Upah :
55 btg 1.66 kg 1 ls
@
Rp. 4,500.00
@
Rp. 7,000.00
@
Rp. 33,211.26
22000
@
Rp. 50,000.00
. = Rp.
27,247.96
@
Rp. 50,000.00
. = Rp. . = Rp.
40,871.93 255,449.59
@
Rp. 62,794.40
. = Rp. . = Rp.
62,794.40 318,244.00
Total
@
Rp. 4,500.00
. = Rp.
4,950.00
@
Rp. 8,000.00
. = Rp. . = Rp.
160.00 5,110.00
@
Rp. 569.97
. = Rp. . = Rp.
569.97 5,679.97
Total
RING BALOK
@
Rp. 3,000.00
. = Rp.
8,250.00
@
Rp. 7,000.00
. = Rp. . = Rp.
1,400.00 9,650.00
@
Rp. 2,325.72
. = Rp. . = Rp.
2,325.72 11,975.72
Total
AL 12 CM
@
Rp. 4,500.00
. = Rp.
247,500.00
@
Rp. 7,000.00
. = Rp. . = Rp.
11,620.00 259,120.00
@
Rp. 33,211.26
. = Rp.
33,211.26
1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SLOOF 5. 15/20 (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton Besi Beton U-24
1 m3 100 kg
Bekesting
5 m2
@
Rp. 318,244.00
@
Rp. 5,679.97
@
Rp. 11,975.72
6. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SKELET 15/15 (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton Besi Beton U-24
1 m3 120 kg
Bekesting
5 m2
@
Rp. 318,244.00
@
Rp. 5,679.97
@
Rp. 11,975.72
7. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK BALOK RING 15/15 (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton Besi Beton U-24
1 m3 120 kg
Bekesting
5 m2
@
Rp. 318,244.00
@
Rp. 5,679.97
@
Rp. 11,975.72
8. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK CANOPY (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton Besi Beton U-24 Bekesting
1 m3 125 kg 5 m2
@
Rp. 318,244.00
@ Rp. 5,679.97 Rp.
Total
. = Rp.
292,331.26
@
Rp. 318,244.00
. = Rp.
318,244.00
@
Rp. 5,679.97
. = Rp.
567,996.72
@
Rp. 11,975.72 Total
. = Rp. . = Rp.
59,878.59 946,119.31
KELET 15/15
@
Rp. 318,244.00
. = Rp.
318,244.00
@
Rp. 5,679.97
. = Rp.
681,596.06
@
Rp. 11,975.72 Total
. = Rp. . = Rp.
59,878.59 1,059,718.65
ALOK RING 15/15
@
Rp. 318,244.00
. = Rp.
318,244.00
@
Rp. 5,679.97
. = Rp.
681,596.06
@
Rp. 11,975.72 Total
. = Rp. . = Rp.
59,878.59 1,059,718.65
@
Rp. 318,244.00
. = Rp.
318,244.00
@
Rp. 5,679.97
. = Rp. . = Rp.
709,995.90 59,878.59
@ Perancah Bambu M
0.5000 ls
@
Rp. 292,331.26
PEKERJAAN SANITASI DAN DRAINASI 1 M' PEKERJAAN INSTALASI AIR 1 BERSIH Bahan : Pipa PVC 3/4\"
0.28
btg
@
Rp.
14,000.
Sock
0.28
bh
@
Rp.
2,000.0
Knee
0.19
bh
@
Rp.
2,000.0
tube
@
Rp.
3,500.0
m'
@
Rp.
3,322.4
Lem PC
Upah :
0.2
1
1 M' PEKERJAAN INSTALASI AIR 2 KOTOR Bahan : Pipa PVC 3\"
0.28
btg
@
Rp.
85,000.
Sock
0.28
bh
@
Rp.
5,000.0
Knee
0.19
bh
@
Rp.
7,800.0
tube
@
Rp.
3,500.0
m'
@
Rp.
6,644.9
set
@
Rp.
1,000,000.
Lem PC Upah :
0.2 1
1 UNIT PEKERJAAN PASANG CLOSET 3 DUDUK Bahan : Closet Duduk
1
11975.72
@
Rp. 292,331.26 Total
. = Rp. . = Rp.
@
Rp.
14,000.00
. = Rp.
3,850.00
@
Rp.
2,000.00
. = Rp.
550.00
@
Rp.
2,000.00
. = Rp.
375.00
@
Rp.
3,500.00
. = Rp. . = Rp.
700.00 5,475.00
@
Rp.
3,322.46 Total
. = Rp. . = Rp.
3,322.46 8,797.46
@
Rp.
85,000.00
. = Rp.
23,375.00
@
Rp.
5,000.00
. = Rp.
1,375.00
@
Rp.
7,800.00
. = Rp.
1,462.50
@
Rp.
3,500.00
. = Rp. . = Rp.
700.00 26,912.50
@
Rp.
6,644.91 Total
. = Rp. . = Rp.
6,644.91 33,557.41
@
Rp.
. = Rp. . = Rp.
1,000,000.00 1,000,000.00
1,000,000.00
146,165.63 1,234,284.12
Upah :
1
unit
@
Rp.
96,484.
4 1 UNIT PEKERJAAN PASANG CLOSET JONGKOK Bahan : Closet Jongkok
1
bh
@
Rp.
74,500.
Dudukan closet
1
ls
@
Rp.
25,000.
1
unit
@
Rp.
48,242.
Upah :
5 1 UNIT PEKERJAAN PASANG WASHTAFEL Bahan : Washtafel
1
set
@
Rp.
200,000.
Upah :
1
unit
@
Rp.
96,484.
1 UNIT PEKERJAAN PASANG WALL 6 SHOWER Bahan : Wallshower
1
set
@
Rp.
50,000.
Upah :
1
unit
@
Rp.
21,125.
bh
@ Rp. 10,000.00
1 unit
@ Rp. 11,960.84 Total
7 1 BH PEKERJAAN PASANG FLOOR DRAIN Bahan : Floordrain 1.0000 Upah :
8 1 BH PEKERJAAN PASANG AVOR (KURASAN
@
Rp.
96,484.10 Total
. = Rp. . = Rp.
96,484.10 1,096,484.10
@
Rp.
74,500.00
. = Rp.
74,500.00
@
Rp.
25,000.00
. = Rp. . = Rp.
25,000.00 99,500.00
@
Rp.
48,242.05
. = Rp. . = Rp.
48,242.05 147,742.05
. = Rp. . = Rp.
200,000.00 200,000.00
. = Rp. . = Rp.
96,484.10 296,484.10
. = Rp. . = Rp.
50,000.00 50,000.00
. = Rp. . = Rp.
21,125.00 71,125.00
Total
@
Rp.
200,000.00
@
Rp.
96,484.10 Total
@
Rp.
50,000.00
@
Rp.
21,125.00 Total
@ Rp. 10,000.00
. = Rp. . = Rp.
10,000.00 10,000.00
@ Rp. 11,960.84
. = Rp. . = Rp.
11,960.84 21,960.84
BAK) Bahan : Avor 1.0000
bh
@ Rp. 5,000.00
1 unit
@ Rp. 11,960.84 Total
bh
@ Rp. 15,000.00
Knee 1.0000
bh
@ Rp. 2,500.00
Isolasi 1.0000
bh
@ Rp. 1,000.00
1 m'
@ Rp. 4,784.34 Total
Upah : 1 BH PEKERJAAN KERAN 9 AIR Bahan : Keran Air (rata-rata) 1.0000
Upah : 1 BH PEKERJAAN KERAN AIR UNTUK 10. DAPUR Bahan : Keran Air (rata-rata) 1.0000
bh
@ Rp. 25,000.00
Knee 1.0000
bh
@ Rp. 2,500.00
Isolasi 1.0000
bh
@ Rp. 1,000.00
1 m'
@ Rp. 4,784.34 Total
Upah :
1 BH PEKERJAAN PASANG SOAP HOLDER 11. TANAM Bahan : Soap Holder 1.0000
bh
@ Rp. 25,000.00
@ Rp. 5,000.00
. = Rp. . = Rp.
5,000.00 5,000.00
@ Rp. 11,960.84
. = Rp. . = Rp.
11,960.84 16,960.84
@ Rp. 15,000.00
. = Rp.
15,000.00
@ Rp. 2,500.00
. = Rp.
2,500.00
@ Rp. 1,000.00
. = Rp. . = Rp.
1,000.00 18,500.00
@ Rp. 4,784.34
. = Rp. . = Rp.
4,784.34 23,284.34
@ Rp. 25,000.00
. = Rp.
25,000.00
@ Rp. 2,500.00
. = Rp.
2,500.00
@ Rp. 1,000.00
. = Rp. . = Rp.
1,000.00 28,500.00
@ Rp. 4,784.34
. = Rp. . = Rp.
4,784.34 33,284.34
@ Rp. 25,000.00
. = Rp. . = Rp.
25,000.00 25,000.00
Upah :
1 bh
@ Rp. 20,100.85 Total
1 UNIT PEKERJAAN PASANG BATH 12. UP Bahan : Bath Up 1.0000 Upah :
set
@ Rp. 1,250,000.00
1 unit
@ Rp. 124,592.07 Total
unit
@ Rp. 200,000.00
1 UNIT PEKERJAAN BIKIN BAK 13. KONTROL Bahan : Bak Kontrol 1.0000 Upah :
1 ls
@ Rp. 73,125.00 Total
14. 1 UNIT PEKERJAAN SUMUR RESAPAN DENGAN BUIS BETON Bahan : Sumur Resapan 1.0000 Upah :
unit 1 ls
@ Rp. 750,000.00 @ Rp. 132,898.21 Total
15. 1 UNIT PEKERJAAN SEPTIC TANK Bahan : Septic tank 1.0000 Upah :
unit 1 ls
@ Rp. 1,500,000.00 @ Rp. 465,143.74 Total
@ Rp. 20,100.85
. = Rp. . = Rp.
@ Rp. 1,250,000.00
. = Rp. . = Rp.
1,250,000.00 1,250,000.00
@ Rp. 124,592.07
. = Rp. . = Rp.
124,592.07 1,374,592.07
@ Rp. 200,000.00
. = Rp. . = Rp.
200,000.00 200,000.00
@ Rp. 73,125.00
. = Rp. . = Rp.
73,125.00 273,125.00
@ Rp. 750,000.00
. = Rp. . = Rp.
750,000.00 750,000.00
@ Rp. 132,898.21
. = Rp. . = Rp.
132,898.21 882,898.21
@ Rp. 1,500,000.00
. = Rp. . = Rp.
@ Rp. 465,143.74
. = Rp.
465,143.74
. = Rp.
1,965,143.74
20,100.85 45,100.85
1,500,000.00 1,500,000.00
16. 1 UNIT PEKERJAAN INSTALASI SUMUR AIR BERSIH + POMPA Bahan + Upah Instalasi sumur air bersih + pompa 1.0000 unit
@ Rp. 1,000,000.00
. = Rp.
@ Rp. 1,000,000.00
. = Rp.
1 UNIT PEKERJAAN INSTALASI WATER 17. TORN Bahan + Upah Instalasi water torn 1.0000 unit M
PEKERJAAN PERKERASAN JALAN 1 1M2 PEKERJAAN PERKERASAN JALAN DENGAN PAVING BLOCK (Dengan 2 lapis pondasi) Bahan : Paving Blok1.1000 m2 @
Rp.
14,000.00
Pasir Beton0.1200 m3 @
Rp.
50,000.00
Sirtu
0.1200 m3 @
Rp.
30,000.00
Pasir urug 0.1350 m3 @
Rp.
27,000.00
Batu Belah 0.3000 m3 @
Rp.
35,000.00
Upah :
Rp.
14,253.33
1.0000 m2 @
1M' PEKERJAAN KANSTEN 2 (25x25x40) CM Bahan : Kansten
1.1000 m' @
Rp.
27,400.00
Pasir Beton0.0300 m3 @
Rp.
50,000.00
Sirtu
Rp.
30,000.00
0.0300 m3 @
00,000.00
00,000.00
. = Rp. Total
. = Rp. Total
. = Rp.
1,000,000.00 1,000,000.00
. = Rp.
1,000,000.00 1,000,000.00
ING BLOCK
Total
. = Rp.
15400
. = Rp.
6000
. = Rp.
3600
. = Rp.
3645
. = Rp.
10500
. = Rp.
39145
. = Rp.
14253.33
. = Rp.
53398.33
. = Rp.
30140
. = Rp.
1500
. = Rp.
900
O
Pasir urug 0.0297 m3 @
Rp.
27,000.00
Batu Belah 0.0660 m3 @
Rp.
35,000.00
Upah :
Rp.
4,560.07
1.0000 m2 @
PEKERJAAN PEMBERSIHAN AKHIR PROYEK 1 LS PEMBERSIHAN AKHIR 1 PROYEK Upah :
1 ls. @
Rp.
200,000.00
Analisa Harga satuan pekerjaan menggunakan metode Modern Yang Dikembangkan oleh dunia)
. = Rp.
801.9
. = Rp.
2310
. = Rp.
35651.9
. = Rp.
4560.07
Total
. = Rp.
embangkan oleh
. = Rp.
40211.97
200000
Pelatihan Jasa Konstruksi Sensa Yogyakarta (metode modern merupakan standar yang berla
kan standar yang berlaku untuk seluruh
RENCANA ANGGARAN BIAYA (RAB) TANPA OVER HEAD PROYEK : sample LOKASI : sample
SAT.
URAIAN PEKERJAAN
No.
A
B
C
PEKJ.
Pekerjaan Persiapan 1 Mobilisasi
ls.
2 Direksikit (2,5x2,5) m
m
3 Gudang (4x3) m 4 Pemagaran Proyek 5 Unizet & Bouwplank 6 Dokumentasi
m m' m' ls.
Pekerjaan Tanah dan Pasir 1 Galian Tanah u/ Pondasi
m
2 Urugan Tanah Kembali
m
3 Urugan Tanah untuk Leveling Lantai
m
4 Urugan Pasir Bawah Pondasi dan Lantai
m
Pekerjaan Pasangan & Plesteran 1 Pasangan Batu Kali Pecah (1 pc. : 6 ps.)
m
2 Pasangan Batu Kali kosong
m
3 Pasangan Bata 1/2 Batu Tasram (1 pc. : 3 ps.)
m
4 Pasangan Bata 1/2 Batu (1 pc. : 5 ps.) 5 Rolaag Bata (1 pc. : 3 ps.)
m m'
6 Plesteran Dinding (1pc : 5ps) t = 20 mm
m
7 Plesteran Trasram (1pc : 3ps) t = 20 mm
m
8 Plesteran Trasram (1pc : 3ps) t = 6 mm 9 Sponengan sudut ( 1pc. : 2 ps.)
m m'
Harga Satuan Pekerjaan Bahan
VOLUME
(Rp)
JUMLAH
Upah
Bahan
(Rp)
1
(Rp)
Upah
TOTAL
BOBOT
( Rp)
(%)
(Rp)
200000
-
200000
0.19
625,000
.5951
1,200,000.00 130,000 1,378,390.00 122,400 489,192 150,000
1.1426 1.3125 .4658 .1428
4,042,582.00
3.8493
200,000.00
2 6.25
100,000
625,000
12 26 40.8 1
100,000 48,015 8,990 150,000
1,200,000.00 5,000 1,248,390.00 3,000 366,792 150,000
-
2
3 52.4711
8,500
-
446,004.35
446,004.35
.4247
27.5767
4,500
-
124,095.15
124,095.15
.1182
3 3 1.9256
27,000
6,500
51,991.2
12,516.4
64,507.6
.0614
2.349
32,400
4,950
76,107.6
11,627.55
87,735.15 722,342.25
.0835 .6878
22.1193
140,408.26
832,238.66 3,937,971.18
3.7496
10.409
54,150
40.4513
30,285.16
196.3907 10
3
3 37,625 3,105,732.51
3 813,463.35
.7746
327,655.53 1,552,729.74
1.4785
25,034.77 8,110.51
7,312.5 4,916,595.49 1,436,106.99 6,352,702.49 3,937.5 81,105.07 39,375 120,480.07
6.0489 .1147
404.0258
4,339.48
9,130 1,753,261.90 3,688,755.55 5,442,017.45
5.1818
73.3026
5,732.05
9,130
420,173.92
669,252.74 1,089,426.66
1.0373
47.6 433.28
2,547.58 630.81
9,130 2,750
121,264.63 434,588 555,852.63 273,315.49 1,191,520.00 1,464,835.49
.5293 1.3948
24,000
563,647.35
249,816
2 8,100 1,225,074.21
2
2 2 2
10 Penebalan Plesteran type A
m'
11 Penebalan Plesteran type B
m' 2 m
12 Lantai Kerja untuk Lantai
SAT. No.
URAIAN PEKERJAAN
D
Pekerjaan Beton Bertulang ( 1pc. : 2ps. : 3kr.) 1 Beton Bertulang untuk Sloof 1 Beton Bertulang untuk Kolom Praktis (Skelet) 2 Beton Bertulang untuk Ring Balok 3 Beton Bertulang untuk Ring Balok Gunung-gunung 4 Beton Bertulang untuk Luifel/ Canopy
E
3 m 3 m 3 m 3 m 3 m
Pekerjaan Penutup Lantai dan Dinding 1 Keramik Lantai 30/ 30 Eks IKAD 2 Keramik Lantai Km/Wc Eks Asia 3 Keramik Dinding Dapur dan Km/Wc Eks Asia 3 Keramik Plint t = 12 cm 4 Batu Belah Susun Sirih untuk pilar teras 5 Batu Alam penutup dinding 6 Keramik Assesoris Km/Wc
F
PEKJ.
2 m 2 m 2 m m' 2 m 2 m pcs.
Pekerjaan Kusen & Daun Pintu Jendela 1 Pekj. Kusen Pintu & Jendela kayu Jati 2 Pekj. Krepyak untuk Jendela kayu Jati 3 Daun Pintu Type P1 (3x61x200) cm 4 Daun Pintu Type P2 (3,5x82x200)cm 5 Daun Pintu Type P3 (KM/WC) (3x74x200)cm 6 Daun Jendela J1 (52x150) cm 7 Daun Jendela J2 (62x116) cm
3 m 3 m bh. bh. bh. bh. bh.
31.5
216.97
8250
6834.68
259875
266709.68
0.25
10.6
347.16
8250
3679.88
87450
91129.88
0.09
74.5
9,492.8
5,720
707,213.9
Harga Satuan Pekerjaan Bahan
VOLUME
(Rp)
Upah
JUMLAH Bahan
(Rp)
426,140 1,133,353.90 22,820,672.53
(Rp)
Upah
1.0792 21.7293
TOTAL
BOBOT
( Rp)
(%)
(Rp)
2.283
814,699.59
98,887.5 1,859,959.17
225,760.16 2,085,719.33
1.986
1.9125
916,899.59
107,465 1,753,570.47
205,526.81 1,959,097.28
1.8654
1.494
916,899.59
107,465 1,369,847.99
160,552.71 1,530,400.70
1.4572
1.7387
916,899.59
107,465 1,594,213.32
186,849.4 1,781,062.71
1.6959
.4992 1,072,009.59
122,104.38
535,147.19
68.5
39,210.55
9,250 2,685,922.62
6
44,710.55
9,250
31.808 39.7
41,301.66 5,601.2
16
141,126.66
12.5565 56
76,426.66 4,480.03
596,101.69 7,952,381.72
.5676 7.5721
633,625 3,319,547.62
3.1608
60,954.5
323,763.29
.3083
30,000 1,313,723.26 6,800 222,367.62
954,240 2,267,963.26 269,960 492,327.62
2.1595 .4688
30,000 2,258,026.59
480,000 2,738,026.59
2.6071
565,042.5 1,524,693.88 56,000 306,881.49 10,973,203.75
1.4518 .2922 10.4484
45,000 1,000
268,263.29
959,651.38 250,881.49
55,500
.7013 6,635,000.00 1,730,000.00 4,653,125.50 .0498 8,835,000.00 1,620,000.00 439,983.00 2 323,600 175,620 647,200 5 506,000 184,740 2,530,000.00 2 391,600 179,020 783,200 2 153,150 70,000 306,300
1,213,249.00 5,866,374.50
5.5858
80,676 520,659 351,240 998,440 923,700 3,453,700.00 358,040 1,141,240.00 140,000 446,300
.4958 .9507 3.2885 1.0867 .425
8 Daun Jendela PJ2 (62x166) cm
SAT. No.
URAIAN PEKERJAAN
G
Pekerjaan Kayu, Rangka Atap & Rangka Plafon
PEKJ.
3 1 Nog, Gording, Murplate dengan kayu Bangkirai.
m 2
m 2 Pekj. Usuk: 5/7, Reng: 3/5 dengan Kayu Bangkirai & Kruing m' 3 Pekj. Lisjplank Kayu Bangkirai 2/25 m' 4 Pekj. Ruiter dengan Kayu Bangkirai 2/20 5 Pekj. Papan Wenvir 2/12
m' 2
6 Pekj. Plafon (60 x 60) Cm dgn Kayu 4/6 & 5/7 Ky Merantim 2 m 7 Pekj. Plafon (100 x 100) Cm dgn Kayu 4/6 & 5/7 Ky Meranti m' 8 Pekerjaan Talang *) Semua Rangka Atap: Gording, Nog,Usuk & Reng dll. dianti Rayap
H
Pekerjaan Penutup Atap & Lis Plafond 2
I
1 Pekj. Atap Genteng Sokka Morando SE Glazur 2 Kerpus Genteng Sokka Morando SE Glazur
m m'
5 Lis sudut - Gypsum
m'
Pekerjaan Kaca & Rilling Kayu 2 1 Kaca Es untuk Boven tebal 5 mm.
J
m
Pekerjaan Cat & Melamin 2 1 Cat Tembok untuk Dinding Merk Catylac
m
2 Cat Tembok untuk Plafond Merk Catylac
m
2 2 2 Cat Kayu untuk lisjplank Standart EMCO
m
3 Politur untuk Kusen Pintu Jendela & BV
m
4 Politur untuk Daun Pintu dan Jendela
m
2 2
bh.
7
136600
70000
956200
490000 1,446,200.00
1.38
2
181300
70000
362600
140000
0.48
502600 14,375,513.50
VOLUME
Harga Satuan Pekerjaan
JUMLAH
Bahan (Rp)
Bahan (Rp)
Upah (Rp)
1.0952 3,155,125.00
Upah (Rp)
13.69
TOTAL
BOBOT
( Rp)
(%)
430,000 3,455,492.90
470,936 3,926,428.90
3.7387
4,000 4,861,362.51 7,250 575,802.24 1,500 377,920.87
548,366 5,409,728.51 250,875.38 826,677.62 42,494.85 420,415.72
5.151 .7871 .4003
137.0915 34.6035 28.3299
35,460.71 16,640 13,340
12.3035
12,580
68.5
39,480.06
13,000 2,704,383.81
37.9052 22.5165
29,650.33 53,940
7,200 1,123,901.82 7,750 1,214,540.01
5,000
154,778.03
216,295.53
.206
890,500 3,594,883.81
3.423
61,517.5
272,917.44 1,396,819.26 174,502.88 1,389,042.89 17,180,292.22
1.33 1.3226 16.3587
137.0915 28.3299
20,790 20,753.76
7,050 2,850,132.29 17,037.5 587,951.87
72
8,000
576,000
966,495.08 3,816,627.36 482,670.67 1,070,622.54
3.6341 1.0194
-
576,000
.5485
5,463,249.90
5.202
-
63,960 63,960
.0609 .0609
3.4761
.78
82,000
63,960
503.1195
2,409.3
4,846.88 1,212,165.81 2,438,557.33 3,650,723.14
106.4052
2,409.3
4,846.88
256,362.05
515,732.7
772,094.75
.7352
8.6509
14,933.75
16,150
129,190.38
139,712.04
268,902.41
.256
27.7159
6,416.8
18,562.5
177,847.39
514,476.39
692,323.78
.6592
K
Pekerjaan Instalasi Listrik 1 Stop kontak
titik
2 Piting Lampu & Sakelar 3 Penangkal Petir (1speed 2 Arde)
titik unit.
SAT. No.
URAIAN PEKERJAAN
L
Pekerjaan Penggantung & Pengunci
M
PEKJ.
1 Slot & Handel Pintu ex. SES 2 Slot Pintu Kupu Tarung ex. SES
bh. bh.
3 Slot Pintu Km/Wc 4 Handle Pintu Kupu Tarung
bh. ps.
5 Engsel Pintu
ps.
6 Engsel Jendela 7 Grendel Jalu untuk Jendela
ps. bh.
8 Grendel Pintu 9 Hag Angin ( Win Hag )
bh. bh.
Pekerjaan Drainasi & Sanitasi 1 Closet Duduk 'Monoblok' ex. Toto 2 Closest Jongkok
unit bh.
3 Wall Shower 4 Wastafel ( Komplit ) ex. INA
unit unit
5 Floor Drain 6 Avor (Kurasan Bak)
bh. bh.
7 Kran Air
bh.
37.41
6416.8
18562.5
240048.64
694411.99
934460.63
0.89
6,318,504.71
6.02
5
75000
375000
-
375000
0.36
16 1
75000 125000
1,200,000.00 125000
-
1,200,000.00 125000
1.14 0.12
1,700,000.00
1.62
Harga Satuan Pekerjaan Bahan
VOLUME
JUMLAH
Upah
(Rp)
Bahan
(Rp)
Upah
(Rp)
TOTAL
BOBOT
( Rp)
(%)
(Rp)
6 1
125000 90000
750000 90000
-
750000 90000
0.71 0.09
2 2
20000 50000
40000 100000
-
40000 100000
0.04 0.1
9
16900
152100
-
152100
0.14
11 22
5000 3000
55000 66000
-
55000 66000
0.05 0.06
16 22
3200 10900
51200 239800
-
51200 239800
0.05 0.23
1,544,100.00
1.47
1 1,000,000.00 1 99500
72600 1,000,000.00 36300 99500
72600 36300
1,072,600.00 135800
1.02 0.13
1 1
50000 200000
15125 72600
50000 200000
15125 72600
65125 272600
0.06 0.26
2 1
10000 5000
9000 9000
20000 5000
18000 9000
38000 14000
0.04 0.01
5
18500
3600
92500
18000
110500
0.11
bh.
8 Kran Air untuk Dapur 9 Soap Holder Tanam 10 Bath Up (Komplit) ex INA
bh. bh.
11 Instalasi Sumur Air Bersih + Pompa 12 Instalasi & Water Torn Stainleesteel
bh. bh.
13 Pemipaan Air bersih
m'
14 Pemipaan Air kotor 15 Pemipaan Air bekas
m' m'
16 Bak Kontrol 17 Bak Lemak
unit unit
18 Sumur Resapan 19 Septictank
unit unit
SAT. No.
URAIAN PEKERJAAN
N
Pekerjaan Perkerasan Jalan
PEKJ.
2 m m'
1 Perkerasan Jalan dengan Conblock 2 Pekj. Kansten 25x25x40
O
Pekerjaan Pembersihan Lokasi ls
1 Pembersihan Lokasi Akhir Proyek
TOTAL
1
28500
3600
28500
3600
32100
0.03
2 25000 1 1,250,000.00
15125 50000 93750 1,250,000.00
30250 80250 93750 1,343,750.00
0.08 1.28
1 1,000,000.00 1 1,000,000.00
1,000,000.00 1,000,000.00
1,000,000.00 1,000,000.00
0.95 0.95
18.2
5218.75
2500
94981.25
45500
140481.25
0.13
20.2 14.7
26912.5 26912.5
5000 5000
543632.5 395613.75
101000 73500
644632.5 469113.75
0.61 0.45
1 1
200000 200000
52000 52000
200000 200000
52000 52000
252000 252000
0.24 0.24
200000 1,700,000.00 350000 1,850,000.00
1.62 1.76
100000 1,500,000.00 350000 1,500,000.00
2 750000 1 1,500,000.00
10,472,952.50
Harga Satuan Pekerjaan Bahan
VOLUME
(Rp)
20 5
1
JUMLAH
Upah (Rp)
39,145 35,651.9
Bahan (Rp)
10,725 3,431.25
200,000
Upah
9.97
TOTAL
BOBOT
( Rp)
(%)
(Rp)
782,900 178,259.5
214,500 17,156.25
-
200,000.00
997,400 195,415.75
.9497 .1861
1,192,815.75
1.1358
200,000 200,000
.1904 .1904
76,643,190.3228,379,380.50105,022,570.81
100
REKAPITULASI RENCANA ANGGARAN BIAYA (SEMENTARA) PROYEK : sample LOKASI : sample NO
MACAM PEKERJAAN
BOBOT (%)
A Pekerjaan Persiapan 3.85
B Pekerjaan Tanah dan Pasir 0.69
C Pekerjaan Pasangan & Plesteran 21.73
D Pekerjaan Beton Bertulang ( 1pc. : 2ps. : 3kr.) 7.57
E Pekerjaan Penutup Lantai dan Dinding 10.45
F
Pekerjaan Kusen & Daun Pintu Jendela 13.69
G Pekerjaan Kayu, Rangka Atap & Rangka Plafon 16.36
H Pekerjaan Penutup Atap & Lis Plafond 5.2
I
Pekerjaan Kaca & Rilling Kayu 0.06
J
Pekerjaan Cat & Melamin 6.02
K Pekerjaan Instalasi Listrik 1.62
L
Pekerjaan Penggantung & Pengunci 1.47
M Pekerjaan Drainasi & Sanitasi 9.97
N
Pekerjaan Perkerasan Jalan 1.14
O Pekerjaan Pembersihan Lokasi 0.19 100
JUMLAH
TOTAL
(Rp) 4,042,582.00 722342.25 22,820,672.53 7,952,381.72 10,973,203.75 14,375,513.50 17,180,292.22 5,463,249.90 63960 6,318,504.71 1,700,000.00 1,544,100.00 10,472,952.50 1,192,815.75 200000 Jumlah Nominal Jasa Konstruksi Jumlah PPN Jumlah Dibulatkan
105,022,570.81 Rp 10.% Rp Rp 10.% Rp Rp Rp
105,022,570.81 10,502,257.08 115,524,827.90 11,552,482.79 127,077,310.68
RENCANA ANGGARAN BIAYA (RAB) DENGAN OVER HEAD PROYEK : sample LOKASI : sample
SAT 0 No.
URAIAN PEKERJAAN
PEK J.
A
B
C
Pekerjaan Persiapan 1 Mobilisasi
ls.
2 Direksikit (2,5 x 2,5) m
m
3 Gudang (4 x 3) m 4 Pemagaran Proyek 5 Unizet & Bouwplank
m m' m'
6 Dokumentasi
ls.
Pekerjaan Tanah dan Pasir 1 Galian Tanah u/ Pondasi
m
2 Urugan Tanah Kembali
m
3 Urugan Tanah untuk Leveling Lantai
m
4 Urugan Pasir Bawah Pondasi dan Lantai
m
Pekerjaan Pasangan & Plesteran 1 Pasangan Batu Kali Pecah (1 pc : 6 ps)
m
2 Pasangan Batu Kali kosong
m
3 Pasangan Bata 1/2 Batu Tasram (1 pc : 3 ps)
m
4 Pasangan Bata 1/2 Batu (1 pc : 5 ps) 5 Rolaag Bata (1 pc : 3 ps)
m m'
6 Plesteran Dinding (1pc : 5ps) t = 20 mm
m
7 Plesteran Trasram (1pc : 3ps) t = 20 mm
m
8 Plesteran Trasram (1pc : 3ps) t = 6 mm
m
R HEAD
Harga Satuan Pekerjaan VOLUM E
Bahan (Rp.)
JUMLAH
Upah
Bahan
(Rp.
1
(Rp.)
200000
-
TOTAL
BOBOT
Upah (Rp.) (Rp.)
(%)
200,000.00
200000
0.1751
625,000
0.5472
2 6.25
100,000
625,000
-
12 26 40.8
100,000 48,015 8,990
1,200,000.00 6,644.91 1,248,390.00 3,986.95 366,792
1,200,000.00 172,767.67 1,421,157.67 162,667.41 529,459.41
1.0507 1.2443 0.4636
1
150,000
150,000
150,000 4,125,617.08
0.1313 3.6122
2
3 52.4711
11,296.35
-
592,731.80
592,731.8
0.5190
27.5767
5,980.42
-
164,920.23
164,920.23
0.1444
3 3 1.9256
27,000
8,638.38
51,991.2
16,634.07
68,625.27
0.0601
2.349
32,400
6,578.46
76,107.6
15,452.81
91,560.41 917,837.71
0.0802 0.8036
22.1193
140,408.26
50,002.95 3,105,732.51 1,106,030.29 4,211,762.81
3.6877
10.409
54,150
31,895.57
895,648.34
0.7842
40.4513
30,285.16
435,448.34 1,660,522.55
1.4539
196.3907 10
25,034.77 8,110.51
9,718.18 4,916,595.49 1,908,560.50 6,825,155.99 5,232.87 81,105.07 52,328.67 133,433.74
5.9758 0.1168
404.0258
4,339.48
12,133.61 1,753,261.90 4,902,290.13 6,655,552.03
5.8273
73.3026
5,732.05
12,133.61
420,173.92
889,424.91 1,309,598.84
1.1466
47.6
2,547.58
12,133.61
121,264.63
577,559.68
0.6119
3
3 3 563,647.35
332,000.99
2 10,764.76 1,225,074.21
2
2 2 2 698,824.31
9 Sponengan sudut ( 1pc : 2 ps)
m'
10 Penebalan Plesteran type A 11 Penebalan Plesteran type B
m' m'
12 Lantai Kerja Rabat Beton untuk Lantai Keramik
m
SAT 0.0 No.
URAIAN PEKERJAAN
PEK J.
D
E
F
Pekerjaan Beton Bertulang ( 1pc : 2ps : 3kr) 1 Beton Bertulang untuk Sloof
m
1 Beton Bertulang untuk Kolom Praktis (Skelet)
m
2 Beton Bertulang untuk Ring Balok
m
3 Beton Bertulang untuk Ring Balok Gunung-gunung
m
4 Beton Bertulang untuk Luifel/Canopy
m
Pekerjaan Penutup Lantai dan Dinding 1 Keramik Lantai 30/ 30 Eks IKAD
m
2 Keramik Lantai Km/Wc Eks Asia
m
3 Keramik Dinding Dapur dan Km/Wc Eks Asia 3 Keramik Plint t = 12 cm
m m'
4 Batu Belah Susun Sirih untuk pilar teras
m
5 Batu Alam penutup dinding 6 Keramik Assesoris Km/Wc
m pcs.
Pekerjaan Kusen & Daun Pintu Jendela 1 Pekj. Kusen Pintu & Jendela kayu Jati
m
2 Pekj. Krepyak Jendela kayu Jati 3 Daun Pintu Type P1 (3x61x200) cm 4 Daun Pintu Type P2 (3,5x82x200)cm 5 Daun Pintu Type P3 (KM/WC) (3x74x200)cm
m bh. bh. bh.
433.28
630.81
3654.7
273315.49
31.5 10.6
216.97 347.16
10964.1 10964.1
6834.68 3679.88
74.5
9,492.8
7,601.78
707,213.9
1,583,508.76 1,856,824.25 345369.23 116219.49
1.6258 0.3084 0.1050
352203.91 119899.36
2
Harga Satuan Pekerjaan VOLUM E
Bahan (Rp)
Upah (Rp)
566,332.44 1,273,546.34 25,992,972.47
1.1151 22.7584
JUMLAH
Bahan (Rp)
TOTAL
BOBOT
( Rp)
(%)
Upah (Rp)
3 2.283
814,699.59
131,419.72 1,859,959.17
300,031.22 2,159,990.38
1.8912
1.9125
916,899.59
142,819.06 1,753,570.47
273,141.46 2,026,711.92
1.7745
1.494
916,899.59
142,819.06 1,369,847.99
213,371.68 1,583,219.67
1.3862
1.7387
916,899.59
142,819.06 1,594,213.32
248,319.5 1,842,532.82
1.6132
162,274.53
81,007.45
616,154.63 8,228,609.43
0.5395 7.2046
842,076.29 3,527,998.90
3.0890
3 3 3 3 .4992 1,072,009.59
535,147.19
2 68.5
39,210.55
12,293.08 2,685,922.62
6
44,710.55
12,293.08
31.808 39.7
41,301.66 5,601.2
16
141,126.66
12.5565 56
76,426.66 4,480.03
2 342,021.8
0.2995
39,869.46 1,313,723.26 9,037.08 222,367.62
1,268,167.89 2,581,891.15 358,772.01 581,139.63
2.2606 0.5088
39,869.46 2,258,026.59
637,911.41 2,895,938.00
2.5356
59,804.19 1,328.98
750,931.37 1,710,582.75 74,423 325,304.49 11,964,876.72
1.4977 0.2848 10.476 -
268,263.29
73,758.51
2
2 2 959,651.38 250,881.49
3 .7013 6,635,000.00 2,299,139.05 4,653,125.50
1,612,386.21 6,265,511.71
5.4858
.0498 8,835,000.00 2,152,951.02 439,983.00 2 323,600 233,395.84 647,200 5 506,000 245,516.15 2,530,000.00 2 391,600 237,914.38 783,200
107,216.96 547,199.96 466,791.68 1,113,991.68 1,227,580.77 3,757,580.77 475,828.75 1,259,028.75
0.4791 0.9754 3.2900 1.1024
3
6 Daun Jendela J1 (52x150) cm
bh.
2
7 Daun Jendela J2 (62x116) cm 8 Daun Jendela PJ2 (62x166) cm
bh. bh.
7 2
153150
93028.75
306300
136600 181300
93028.75 93028.75
956200 362600
492357.5
0.4311
651201.23 1,607,401.23 186057.5 548657.5
1.4074 0.4804
186057.5
15,591,729.10
13.65
SAT 0 No.
URAIAN PEKERJAAN
PEK J.
G
Pekerjaan Kayu, Rangka Atap & Rangka Plafon 3 m 1 Nog, Gording, Murplate dengan kayu Bangkirai. 2 m 2 Pekj. Usuk: 5/7, Reng: 3/5 dengan Kayu Bangkirai & Kruing m' 3 Pekj. Lisjplank Kayu Bangkirai 2/25 4 Pekj. Ruiter dengan Kayu Bangkirai 2/20 m' 5 Pekj. Papan Wenvir 2/12
m' 2
6 Pekj. Plafon Gypsium Rangka (60x60) Cmm Ky Meranti 2 7 Pekj. Plafon Calsiboard Rangka (100x100)m Cm Ky Meranti m' 8 Pekerjaan Talang *) Semua Rangka Atap: Gording, Nog,Usuk & Reng dll. dianti Rayap
H
Pekerjaan Penutup Atap & Lis Plafond 2 m 1 Pekj. Atap Genteng Sokka Morando SE Glazur m' 2 Kerpus Genteng Sokka Morando SE Glazur m' 3 Lis sudut - Gypsum
I
Pekerjaan Kaca & Rilling Kayu 2 1 Kaca Es untuk Boven tebal 5 mm.
J
m
Pekerjaan Cat & Melamin 2 1 Cat Tembok untuk Dinding Merk Catylac m 2 2 Cat Tembok untuk Plafond Merk Catylac m 2 3 Cat Kayu untuk lisjplank Standart EMCO m 2 4 Politur untuk Kusen Pintu Jendela & BV
m
5 Politur untuk Daun Pintu dan Jendela
m
2
K
Pekerjaan Instalasi Listrik
JUMLAH
Harga Satuan Pekerjaan VOLUM E
Bahan (Rp)
Upah (Rp)
1.0952 3,155,125.00 137.0915 34.6035 28.3299
35,460.71 16,640 13,340
12.3035
12,580
68.5 37.9052 22.5165
Bahan (Rp)
TOTAL
BOBOT
( Rp)
(%)
Upah (Rp)
571,462.31 3,455,492.90
625,865.52 4,081,358.42
3.5735
5,315.93 4,861,362.51 9,635.12 575,802.24 1,993.47 377,920.87
728,768.6 5,590,131.12 333,408.88 909,211.12 56,474.9 434,395.76
4.8945 0.7961 0.3803
236,533.69
0.2071
39,480.06
17,276.77 2,704,383.81 1,183,458.57 3,887,842.37
3.4040
29,650.33 52,680
9,568.67 1,123,901.82 10,299.61 1,186,169.22
1.3016 1.2416
6,644.91
154,778.03
81,755.66
362,702.39 1,486,604.21 231,911.2 1,418,080.42 18,044,157.11
137.0915 28.3299 72
20,790 20,753.76 8,000
15.7987
9,369.32 2,850,132.29 1,284,454.66 4,134,586.95 22,642.53 587,951.87 641,460.69 1,229,412.55 576,000 576,000
3.6201 1.0764 0.5043
5,939,999.50
5.2008
-
63,960 63,960
0.0560 0.0560
.78
82,000
63,960
503.1195
2,409.3
6,441.41 1,212,165.81 3,240,799.06 4,452,964.87
3.8988
106.4052
2,409.3
6,441.41
256,362.05
685,399.54
941,761.58
0.8246
8.6509
14,933.75
21,463.06
129,190.38
185,674.79
314,865.17
0.2757
27.7159
6,416.8
24,669.23
177,847.39
683,729.92
861,577.31
0.7544
37.4094
6,416.8
24,669.23
240,048.64
922,861.11 1,162,909.75 7,734,078.68
1.0182 6.7716
1 Stop kontak
titik
2 Piting Lampu & Sakelar 3 Penangkal Petir (1speed 2 Arde)
titik unit.
SAT 0 No.
URAIAN PEKERJAAN
PEK J.
L
M
Pekerjaan Penggantung & Pengunci 1 Slot & Handel Pintu ex. SES
bh.
2 Slot Pintu Kupu Tarung ex. SES 3 Slot Pintu Km/Wc
bh. bh.
4 Handle Pintu Kupu Tarung 5 Engsel Pintu
ps. ps.
6 Engsel Jendela 7 Grendel Jalu untuk Jendela
ps. bh.
8 Grendel Pintu
bh.
9 Hag Angin ( Win Hag )
bh.
Pekerjaan Drainasi & Sanitasi 1 Closet Duduk 'Monoblok' ex. Toto
unit
2 Closest Jongkok 3 Wall Shower
bh. unit
4 Wastafel (komplit) ex. INA 5 Floor Drain
unit bh.
6 Avor (kurasan bak) 7 Kran Air
bh. bh.
8 Kran Air untuk Dapur 9 Soap Holder Tanam
bh. bh.
5
75000
375000
16 1
75000 125000
1,200,000.00 125000
Harga Satuan Pekerjaan VOLUM E
Bahan
0.3283
1,200,000.00 125000
1.0507 0.1094
1,700,000.00
1.4885
JUMLAH
Upah
(Rp)
375000
-
(Rp)
Bahan (Rp)
TOTAL
BOBOT
Upah ( Rp) (Rp)
(%)
6
125000
750000
-
750000
0.6567
1 2
90000 20000
90000 40000
-
90000 40000
0.0788 0.0350
2 9
50000 16900
100000 152100
-
100000 152100
0.0876 0.1332
11 22
5000 3000
55000 66000
-
55000 66000
0.0482 0.0578
16
3200
51200
-
51200
0.0448
22
10900
239800
239800 1,544,100.00
0.2100 1.3520
1 1,000,000.00
96484.1 1,000,000.00
96484.1 1,096,484.10
0.9600
1 1
99500 50000
48242.05 21125
99500 50000
48242.05 21125
147742.05 71125
0.1294 0.0623
1 2
200000 10000
96484.1 11960.84
200000 20000
96484.1 23921.68
296484.1 43921.68
0.2596 0.0385
1 5
5000 18500
11960.84 4784.34
5000 92500
11960.84 23921.68
16960.84 116421.68
0.0149 0.1019
1
28500
4784.34
28500
4784.34
33284.34
0.0291 0.0790
10 Bath Up (komplit) ex INA
bh.
11 Instalasi Sumur Air Bersih 12 Instalasi & Water Torn Stainleesteel
bh. bh.
13 Pemipaan Air bersih 14 Pemipaan Air kotor
m' m'
15 Pemipaan Air bekas
m'
16 Bak Kontrol 17 Bak Lemak
unit unit
18 Sumur Resapan 19 Septictank
unit unit
SAT 0 No.
URAIAN PEKERJAAN
PEK J.
N
Pekerjaan Perkerasan Jalan 2 m m'
1 Perkerasan Jalan dengan Conblock 2 Pekj. Kansten 25x25x40
O
Pekerjaan Pembersihan Lokasi ls
1 Pembersihan Lokasi Akhir Proyek
TOTAL
2
25000
20100.85
50000
40201.71
90201.71
1 1,250,000.00
124592.07 1,250,000.00
124592.07 1,374,592.07
1.2035
1 1,000,000.00 1 1,000,000.00
1,000,000.00 1,000,000.00
1,000,000.00 1,000,000.00
0.8756 0.8756
18.2 20.2
5475 26912.5
3322.46 6644.91
99645 543632.5
60468.69 134227.19
160113.69 677859.69
0.1402 0.5935
14.7
26912.5
6644.91
395613.75
97680.18
493293.93
0.4319
1 1
200000 200000
73125 73125
200000 200000
73125 73125
273125 273125
0.2391 0.2391
265796.42 1,765,796.42 465143.74 1,965,143.74
1.5461 1.7206
132898.21 1,500,000.00 465143.74 1,500,000.00
2 750000 1 1,500,000.00
10,895,675.04
Harga Satuan Pekerjaan VOLUM E
Bahan (Rp)
20 5
1
JUMLAH
Upah (Rp)
39,145 35,651.9
9.5398
Bahan (Rp)
14,253.33 4,560.07
200,000
782,900 178,259.5
-
TOTAL
BOBOT
Upah ( Rp) (Rp)
(%)
285,066.66 1,067,966.66 22,800.35 201,059.85
0.9351 0.1760
1,269,026.51
1.1111
200,000 200,000
0.1751 0.1751
200,000.00
76,619,483.2837,593,156.09114,212,639.36 100.00
REKAPITULASI RENCANA ANGGARAN BIAYA (FINAL/REA PROYEK : sample LOKASI : sample NO
MACAM PEKERJAAN
A
Pekerjaan Persiapan
B
Pekerjaan Tanah dan Pasir
C D
Pekerjaan Pasangan & Plesteran Pekerjaan Beton Bertulang ( 1pc : 2ps : 3kr)
E
Pekerjaan Penutup Lantai dan Dinding
F G
Pekerjaan Kusen & Daun Pintu Jendela Pekerjaan Kayu, Rangka Atap & Rangka Plafon
H
Pekerjaan Penutup Atap & Lis Plafond
I J
Pekerjaan Kaca & Rilling Kayu Pekerjaan Cat & Melamin
K L
Pekerjaan Instalasi Listrik Pekerjaan Penggantung & Pengunci
M
Pekerjaan Drainasi & Sanitasi
N O
Pekerjaan Perkerasan Jalan Pekerjaan Pembersihan Lokasi
A (FINAL/REAL)
BOBOT
JUMLAH TOTAL
(%)
(Rp) 3.61
4,125,617.08
0.8
917,837.71
22.76 25,992,972.47 7.2
8,228,609.43
10.48 11,964,876.72 13.65 15,591,729.10 15.8 18,044,157.11 5.2
5,939,999.50
0.06 6.77
63,960.00 7,734,078.68
1.49 1.35
1,700,000.00 1,544,100.00
9.54 10,895,675.04 1.11 0.18
1,269,026.51 200,000.00
100
114,212,639.36
Jumlah Nominal Jasa Konstruksi 10.%
Rp Rp
114,212,639.36 11,421,263.94
Jumlah PPN
Rp Rp
125,633,903.30 12,563,390.33
Rp Rp
138,197,293.63 138,190,000.00
Jumlah Dibulatkan
10.%
14,212,639.36 11,421,263.94
25,633,903.30 12,563,390.33
38,197,293.63 38,190,000.00