DAFTAR HARGA SATUAN BAHAN BANGUNAN SAMPLE NO

JENIS BAHAN BANGUNAN 1 2 1 Semen PPC (Gresik)

SATUAN 3 /zak 3

2 Pasir pasang

/m 3

3 Pasir urug

/m 3

4 Tanah urug 5 Kapur 6 Mill

/m /zak /zak 3

7 Batu kali 8 Batu bata 9 Besi beton Polos U.24 (SNI) 10 Besi beton Ulir U.39 (SNI)

/m /bh /kg /kg 3

11 Batu split 2-3 cm (pecah manual) /m 3

12 Batu split 3-4 cm (pecah manual) /m 3

13 Koral 3-4 cm /m 14 Bendrat /kg 15 Taek wood 3 mm (90 x 210) cm /lembar Papan sengon (Bekesting) 2/20 x 200 16 cm /lembar 17 Bambu /batang 18 Dolken /batang 19 Minyak bekesting /liter 20 Paku (rata-rata) /kg 21 Paku Plepet /kg 22 Paku Zeng /bh 23 Lem Kayu /kg 3

24 Balok kayu Meranti

/m 3

25 Papan kayu Meranti

/m

3

26 Balok kayu Jati kelas Politur

/m 3

27 Papan kayu Jati kelas Politur

/m 3

28 Balok kayu Bengkirai

/m 3

29 Papan kayu Bengkirai

/m 3

30 Balok kayu Kamper

/m 3

31 Papan kayu Kamper

/m 3

32 Balok kayu Kruing

/m 3

33 Papan kayu Kruing 34 Genteng Beton eks Mutiara 35 Nok genteng Beton Eks Mutiara 36 Zeng Datar 90 cm

/m /buah /buah /m' 2

37 Kaca bening 5 mm (ASAHI MAS) /m

HARGA (Rp.)

KETERANGAN 4 5 22000 1 zak = 40 Kg 50,000 27,000 22,500 4,500 1 zak = 21,5 kg 4,500 1 zak = 22 kg 35,000 180 4,500 5,000 90,000 67,000 50,000 8,000 45,000 3,000 4,500 4,000 8,000 7,000 8,000 150 13,000

1,200,000 1,400,000

6,000,000 8,000,000 2,800,000 3,000,000 3,200,000 3,450,000 1,800,000 2,000,000 2,100 4,000 24,000 60,000

2

38 Kaca Es untuk Boven t = 5 mm Kaca Rayband 50 %, t = 5 mm (ASAHI

/m

70,000

2

39 MAS)

/m

85,000

HARGA No.

JENIS BAHAN BANGUNAN

SATUAN (Rp) 2

40 Keramik Lantai setara Hercules 30x30

/m

30,000

2

41 Keramik dinding Setara Asia 20x25 Keramik Serit (KM/WC) setara Asia

/m

33,000

2

42 20x20 43 Keramik assesoris 10x20 44 Semen grouting 45 Kanstin Abu-abu ukr. 25.25.40

/m /buah /kg /m'

35,000 4,000 7,500 27,400

2

46 Conblock kelas biasa 47 Tripleks 3 mm (120x240) 48 Eternit Harflex 1x1 m, biasa (Kerang) Eternit Harflex 1x1 m, biasa 49 (Djubesment) 50 Gypsium Board (120x240) cm 51 Calsiboard (120x240) cm 52 List Plafon Gypsium L = 10 Cm 53 Cat kayu eks EMCO (bintang) 54 Cat Catylac 55 Plamur tembok 56 Plamur kayu 57 Thiner 58 Meni besi 59 Meni kayu 60 Amplas

/m /lembar /lembar

14,000 45,000 3,500

/lembar /lembar /lembar /m' /kg /5 Kg /kg /kg /liter /liter /liter /lembar

6,000 35,000 30,000 8,000 33,000 50,000 5,800 9,700 4,500 9,000 6,000 1,250

61 Slot dan Handle Pintu (SES) 62 Slot Pintu Kupu tarung (SES)

/bh /bh

125,000 90,000

63 Kunci KM/Wc ex. Alpha 64 Engsel pintu kuningan ukr. 3\"x4\" (aiwa) 65 Engsel H untuk Daun Jendela (Lokal) 66 Grendel ukuran 8\" (RRT) 67 Grendel Jalu untuk Jendela

/bh /ps /ps /bh /bh

20,000 16,900 5,000 3,200 3,000

KETERANGAN

68 Hak angin kuningan ukr. 21 - 30 cm 69 Handle Pintu (u/ pintu Kupu tarung)

/bh /ps

10900 50000

70 Closet duduk TOTO Monoblok 71 Closet jongkok Standart 72 Washtafel body standart INA 73 Wallshower 74 Floordrain 75 Avor (kurasan Bak) 76 Bathup Standart INA 77 Keran Air Standart (Rata-rata)

/set /set /set /set /bh /bh /set /bh

1000000 74500 200000 50000 10000 5000 1250000 15000

78 79 80 81 82 83 84 85 86

/bh /bh /bh /bh /bh /bh /bh /bh /bh

25000 25000 1000 14000 85000 2500 2000 3000 7800 HARGA

No.

Keran Dapur Soap Holder Isolasi Pipa PVC 3/4\" eks Wavin Pipa PVC 3\" eks Wavin Knee 3/4\" Sock 3/4\" Tee 3/4\" Knee 3\" JENIS BAHAN BANGUNAN

SATUAN (Rp)

87 88 89

Sock 3\" Tee 3\" Lem PVC (tube)

90

Batu Candi ( Andesit)

/bh /bh /bh

5000 8200 3500

2

/m

65,000

2

91 92 93 94 95 96 97 98 99 100

Batu Belah Baut Plate Begel Solar Lis Kayu Roster Kayu 30x 30 Sirlak Spirtus Batu Apung

/m /bh /bh /bh /ltr /m' /bh /kg /ltr /kg

65,000 1,500 1,000 7,500 2,300 3,000 45,000 60,000 6,000 4,000

KETERANGAN

NO.

DAFTAR PEKERJA

SATUAN

1

TUKANG BATU

Hari

22000

2

TUKANG KAYU

Hari

22000

3

TUKANG BESI

Hari

25000

4

TUKANG LISTRIK

Hari

25000

5

TUKANG PLAMBING

Hari

21000

6

TUKANG KERAMIK

Hari

25000

7 TUKANG BIKIN KUSEN

Hari

30000

8 TUKANG PAVING BLOK

Hari

20000

9

TENAGA

Hari

18000

TUKANG CAT

Hari

22000

10

UPAH (Rp.)

KET. per Hari per Hari per Hari per Hari per Hari per Hari per Hari per Hari per Hari per Hari

DAFTAR UPAH BORONGAN/ BA

DI KABUPATEN SLEMAN BULAN

No

A.

JENIS PEKERJAAN

Sat. Pekj

PEKERJAAN PERSIAPAN 1 Uitzet & Bouwplank

M`

2 Pembuatan Direksikit (Tripleks, Zeng, Lt. Rabat Beton) M2 3 Pembuatan Gudang (Tripleks, Zeng, Lt. Rabat Beton) M2 4 Pembuatan Brak (Tripleks, Zeng, Lt. Rabat Beton)

M2

5 Pembuatan Pagar Proyek (Balok Kayu & Zeng)

M`

6 Pembuatan Pagar Proyek (Bambu & Gedek/Anyaman M`Bambu) 7 Pembersihan Lokasi Proyek B.

M2

PEKERJAAN TANAH DAN PASIR 1 Galian Tanah (untuk Pondasi Batu Kali)

M3

2 Galian Tanah (untuk Pondasi Foot Plat)

M3

3 Urugan Tanah Kembali (termasuk Pemadatan)

M3

4 Urugan Tanah (termasuk Pemadatan).

M3

5 Urugan Pasir

M3

6 Urugan Pasir Di Bawah Pondasi ( t = 10 Cm)

M2

7 Urugan Pasir Di Bawah Lantai ( t = 10 Cm)

M2

8 Urugan Sirtu

M2

9 Urugan Splite/Koral Untuk Jalan Lingkungan

M2

AH BORONGAN/ BAS BORONG

TEN SLEMAN BULAN MARET 2005

Faktor Upah Borongan Alat (Rp) (%)

Upah Langsung (Rp)

3000 0 3,000.00

Over Head (%)

Upah Total (Rp)

32.9

3986.95

36000 0 36,000.00

32.9 47843.36

36000 0 36,000.00

32.9 47843.36

30000 0 30,000.00

32.9 39869.46

5000 0 5,000.00

32.9

6644.91

5000 0 5,000.00

32.9

6644.91

2400 0 2,400.00

32.9

3189.56

8500 0 8,500.00

32.9 11296.35

10000 0 10,000.00

32.9 13289.82

4500 0 4,500.00

32.9

5980.42

6500 0 6,500.00

32.9

8638.38

4950 0 4,950.00

32.9

6578.46

1100 0 1,100.00

32.9

1461.88

1100 0 1,100.00

32.9

1461.88

1000 0 1,000.00

32.9

1328.98

1375 0 1,375.00

32.9

1827.35

No

C.

JENIS PEKERJAAN

PEKERJAAN PASANGAN DAN PLESTERAN 1 Pasangan Batu Kali Kosong untuk Pondasi 2 Pekerjaan Pondasi Batu Kali Pecah 3 Pasangan Bata 1/2 Batu (Trasram) 4 Pasangan Bata 1/2 Batu 5 Pasangan Rolag Bata (Diatas Pondasi & Kusen) 6 Plesteran Trasram 7 Plesteran 8 Sponengan Sudut (Tembok) 9 Sponengan Beton (pada Kolom. Balok dll.) 10 Penebalan Plesteran Sederhana 11 Penebalan Plesteran Rumit (Lengkung atau sudut > 4sudut) 12 Lantai Kerja (dengan spesi tebal + 3 Cm) 13 Lantai Kerja (dengan Rabat Beton tebal > 4 Cm) 14 Pasang Glass Blok (20/20 atau setara) 15 Pasang Roster Kayu

Sat. Pekj

Faktor Upah Borongan Alat (Rp) (%)

Upah Langsung (Rp)

Over Head (%)

Upah Total (Rp)

M3

24000

0

24000

32.9 31895.57

M3

35000

7.5

37625

32.9 50002.95

M2

7200

12.5

8100

32.9 10764.76

M2

6500

12.5

7312.5

32.9

9718.18

M`

3500

12.5

3937.5

32.9

5232.87

M2

8300

10

9130

32.9 12133.61

M2

8300

10

9130

32.9 12133.61

M`

2750

0

2750

32.9

3654.7

M`

3250

0

3250

32.9

4319.19

M`

7500

10

8250

32.9

10964.1

M`

11250

10

12375

M2

3300

0

3300

32.9

4385.64

M2

5200

10

5720

32.9

7601.78

bh.

1900

0

1900

32.9

2525.07

bh.

1000

0

1000

32.9

1328.98

32.9 16446.15

D

PEKERJAAN ATAP & PLAFOND 1 Kuda­Kuda Kayu ( Bentang < 9 M ) 2 Gording, Jurai, Murplate, Nog. 3 Usuk & Reng 4 Papan Ruiter 5 Lisjplank ( Tunggal ) 6 Lisjplank ( Double ) 7 Wenvir (Kayu Lapis Zeng) 8 Talang (Papan, Zeng, Cat Zeng & Meni Papan) 9 Plafond (Rangka Saja): 100 x 100

No

JENIS PEKERJAAN

10 Plafond (Rangka Saja): 80 x 60 11 Plafond (Rangka Saja): 60 x 60 12 Plepet ( antar penutup plafond ) 13 Profil Kayu ( Untuk Pertemuan Tembok & Plafond ) 14 Pasang Penutup Plafond saja (Dengan Asbes/Ternit) 15 Pasang Penutup Plafond saja (Dengan Kayu Lapis) E

PEKERJAAN PENUTUP ATAP 1 Genteng Keramik 2 Genteng \"Plentong\" Kampung (Standar) 3 Genteng \"Kodok\"

M3

450000

35

607500

32.9

###

M3

430000

0

430000

32.9

###

M2

4000

0

4000

32.9

5315.93

M`

1500

0

1500

32.9

1993.47

M`

7250

0

7250

32.9

9635.12

M`

14500

0

14500

M`

5000

0

5000

32.9

M`

7750

0

7750

32.9 10299.61

M2

7200

0

7200

32.9

Sat. Pekj

Faktor Upah Borongan Alat (Rp) (%)

Upah Langsung (Rp)

32.9 19270.24

Over Head (%)

6644.91

9568.67

Upah Total (Rp)

M2

11500

0

11500

32.9 15283.29

M2

13000

0

13000

32.9 17276.77

M`

1000

0

1000

32.9

1328.98

M`

1900

0

1900

32.9

2525.07

M2

1300

0

1300

32.9

1727.68

M2

1300

0

1300

32.9

1727.68

M2

6000

17.5

7050

32.9

9369.32

M2 M2

7300 10000

17.5 17.5

8577.5 11750

32.9 11399.34 32.9 15615.54

4 Kerpus Genteng Keramik 5 Kerpus Genteng Kampung F

PEKERJAAN PENUTUP LANTAI & DINDING 1 Keramik Lantai 2 Keramik Tangga 3 Keramik Dinding 4 Keramik Plin 5 Keramik Assesories 6 Pasang Dinding Batu Alam (Jenis Bt Alam Rata) 7 Pasang Dinding Batu Alam (Jenis Bt Alam Tidak Rata)

No

G

JENIS PEKERJAAN

PEKERJAAN KUSEN & DAUN PINTU­JENDELA 1 Bikin Kusen Pintu & Jendela (Kayu < Klas 2) 2 Bikin Kusen Pintu & Jendela ( Jati, Ulin, & Setara ) 3 Bikin Krepyak untuk Kusen Pintu dan Jendela 4 Bikin Daun Pintu Panil 5 Bikin Daun Pintu Double Teakwood (Setara) 6 Bikin Daun Jendela ( Tidak Ber Regel/Teler ) 7 Bikin Daun Jendela ( Termasuk Regel/Teler ) 8 Stel Kusen Di Proyek 9 Stel Daun Pintu Panil

M`

14500

17.5

17037.5

32.9 22642.53

M`

14500

17.5

17037.5

32.9 22642.53

M2

7400

25

9250

32.9 12293.08

M2

13800

100

27600

32.9 36679.91

M2

15000

100

30000

32.9 39869.46

M`

3400

100

6800

32.9

9037.08

bh

500

100

1000

32.9

1328.98

M2

15000

200

45000

32.9 59804.19

M2

20000

50

30000

32.9 39869.46

Sat. Pekj

Faktor Upah Borongan Alat (Rp) (%)

Upah Langsung (Rp)

Over Head (%)

Upah Total (Rp)

M3

575000

50

862500

32.9 1,146,247.07

M3

700000

75 1,730,000.00

32.9 2,299,139.05

M3

800000

75 1,620,000.00

32.9 2,152,951.02

bh.

48750

100

128500

32.9 170774.2

bh.

26000

25

32500

32.9 43191.92

bh.

30000

50

45000

32.9 59804.19

bh.

32500

50

48750

32.9 64787.88

M3

340000

0

340000

bh.

31000

0

31000

32.9

###

32.9 41198.45

10 Stel Daun Pintu Double Teakwood (atau setara) 11 Stel Daun Jendela 12 Stel Daun Jendela BV H

PEKERJAAN SANITASI & DRAINASI 1 Pasang Closet Jongkok 2 Pasang Closet Duduk ­ Monoblok 3 Pasang Washtafel 4 Pasang Washtafel & Penyangga 5 Pasang Washbak (Tempat Cuci Piring) 6 Pasang WallShower 7 Pasang Double Hug 8 Pasang Tempat Sabun (di Dinding) 9 Pasang Kran 10 Pasang Stop Kran 11 Pasang Floor Drain 12 Pasang Avor

No

JENIS PEKERJAAN

13 Bikin Bak Mandi (Standar) 14 Instalasi (PVC) Water Torn) 15 Saluran Air Bersih (PVC diameter: 1' ; 3/4' ; 1/2') 16 Saluran Air Sabun & Air Kotor dengan PVC

bh.

27000

0

27000

32.9 35882.52

bh.

25000

0

25000

32.9 33224.55

bh.

18000

0

18000

32.9 23921.68

Unit

36300

0

36300

32.9 48242.05

Unit

72600

0

72600

32.9

96484.1

Unit

72600

0

72600

32.9

96484.1

Unit

90750

0

90750

32.9

###

Unit

42350

0

42350

32.9 56282.39

Unit

15125

0

15125

32.9 20100.85

bh.

15125

0

15125

32.9 20100.85

bh.

15125

0

15125

32.9 20100.85

bh.

3600

0

3600

32.9

4784.34

bh.

6000

0

6000

32.9

7973.89

bh.

9000

0

9000

32.9 11960.84

bh.

9000

0

9000

32.9 11960.84

Sat.

Faktor Upah Borongan Alat

Upah Langsung

Over Head

Upah Total

Pekj

(Rp)

(Rp)

(%)

(Rp)

(%)

Unit

93750

0

93750

32.9

###

Unit

30000

0

30000

32.9 39869.46

M'

2500

0

2500

32.9

3322.46

M'

5000

0

5000

32.9

6644.91

17 Bak Kontrol Tertutup (Air Sabun & Air Bersih) Stndar 18 Bikin Sumur Resapan 19 Bikin Septictank I

PEKERJAAN STRUKTUR BETON & BAJA 1 Besi Untuk Struktur Beton Bertulang Dia < 12 mm 2 Besi Untuk Struktur Beton Bertulang Dia > 12 mm 3 Bekesting Kolom Praktis, Sloof, Ring Balok, dll. 4 Cort Beton Kolom Praktis, Sloof, Ring Balok dll. 5 Perancah Bambu

J

PEKERJAAN CAT ; MELAMIN ; POLITUR 1 Cat Tembok ( 3 Sapuan ) 2 Meni Bidang Kayu Baru 3 Cat Kayu ( 3 Kali Sapuan ) 4 Politur 5 Melamin 6 Cat Genteng, Asbes Gelombang.

K

PERKERASAN JALAN LINGKUNGAN 1 Pasang Makadam / Bt. Kali Pecah (tebal < 28 Cm) 2 Batu Pecah 5/7 (tebal < 15 Cm) 3 Batu Pecah 2/3 (tebal < 6 Cm)

No

JENIS PEKERJAAN

Unit

52000

0

52000

Unit

100000

0

100000

32.9

###

Unit

350000

0

350000

32.9

###

Kg.

400

17.5

470

32.9

624.62

Kg.

330

17.5

387.75

32.9

515.31

M2

1750

0

1750

32.9

2325.72

M3

35000

35

47250

32.9

62794.4

M2

3000

0

3000

32.9

3986.95

M2

4125

17.5

4846.88

32.9

6441.41

M2

2900

10

3190

32.9

4239.45

M2

9600

35

12960

32.9 17223.61

M2

13750

35

18562.5

32.9 24669.23

M2

25000

35

33750

32.9 44853.15

M2

2400

15

2760

32.9

3667.99

M2

3300

25

4125

32.9

5482.05

M2

2000

25

2500

32.9

3322.46

M2

2000

25

2500

32.9

3322.46

Sat. Pekj

Faktor Upah Borongan Alat (Rp) (%)

Upah Langsung (Rp)

32.9 69107.07

Over Head (%)

Upah Total (Rp)

L

4 Sirtu (tebal < 10 Cm)

M2

5 Pasang Conblok

M2

6 Pengasphalan

M2

7 Pasang Kansten

M'

LISTRIK DAN PENANGKAL PETIR 1 Lampu (piting & Saklar)

ttk.

2 Stop Kontak.

ttk.

3 NCB

Unit

4 Penangkal Petir 1 speed dgn 2 Arde (Arde maks ­5,0M) Unit

Besarnya Over Head (OH)

1600

25

2000

32.9

2657.96

4600

0

4600

32.9

6113.32

2500

25

3125

32.9

4153.07

1900

0

1900

32.9

2525.07

24200

0

24200

32.9 32161.37

24200

0

24200

32.9 32161.37

82500

0

82500

32.9

###

310000

0

310000

32.9

###

32.90

%

DAFTAR ANALISIS HARGA SATUAN PEKERJAAN (HSP) - TANPA OVER HEAD PROYEK : SAMPLE LOKASI : SAMPLE A 1.

PEKERJAAN PERSIAPAN MOBILISASI Upah :

1 ls.

@

1M2 PEMBERSIHAN LOKASI 2. PROYEK Upah :

1.00

M2

@

1 M' PEKERJAAN UITZET & 3. BOUWPLANK Bahan : Papan Sengon 0.5500

Lbr

@

Balok Kayu 0.0060

M3

@

Paku 0.0200

Kg.

@

Upah :

1 M' PEMAGARAN LOKASI PROYEK

1 M`

@

Rp. 200,000.00

. = Rp.

200,000.00

Rp. 2,800.00

. = Rp.

2,800.00

Rp. 3,000.00

. = Rp.

1,650.00

Rp. 1,200,000.00

. = Rp.

7,200.00

Rp. 7,000.00

. = Rp. . = Rp.

140.00 8,990.00

Rp. 3,000.00 Total

. = Rp. . = Rp.

3,000.00 11,990.00

4 Bahan : Zeng 1.2500

Lbr

@

Balok Kayu 0.0300

M3

@

Paku Zeng 12.5000

bh.

@

Paku 0.0200

Kg.

@

Upah :

1 M`

@

M2

@

1 M2 PEKERJAAN 5. DIREKSIKIT Bahan & Upah :

6.

1 M2 PEKERJAAN MEMBUAT BRAK UNTUK GUDANG Bahan & Upah :

7.

1.00

m2

@

ADMINISTRASI DAN DOKUMENTASI Bahan & Upah :

B

1.00

PEKERJAAN TANAH DAN PASIR

1 ls.

@

Rp. 8,000.00 Rp. 1,200,000.00

. = Rp. . = Rp.

10,000.00 36,000.00

Rp. 150.00

. = Rp.

1,875.00

Rp. 7,000.00

. = Rp. . = Rp.

140.00 48,015.00

Rp. 5,000.00 Total

. = Rp. . = Rp.

5,000.00 53,015.00

Rp. 100,000.00

. = Rp.

100,000.00

Rp. 100,000.00

. = Rp.

100,000.00

Rp. 150,000.00

. = Rp.

150,000.00

1 M3 PEKERJAAN GALIAN TANAH 1. BIASA Untuk Pondasi Batu Kali Upah :

2.

1 m3

@

Rp. 8,500.00

1 m3

@

Rp. 10,000.00

1 m3

@

Rp. 4,500.00

m3

@

Rp. 22,500.00

1 m3

@

Rp. 6,500.00

m3

@

Rp. 27,000.00

1 M3 PEKERJAAN GALIAN TANAH s.d. -2 M Untuk Foot Plate Upah :

1 M3 PEKERJAAN URUGAN TANAH 3. KEMBALI Upah : *) *). Termasuk Pemadatan 4. 1 M3 PEKERJAAN URUGAN TANAH Dengan Mendatangkan Tanah dari Luar Bahan : Tanah Urug 1.2000 Upah : *) *). Termasuk Pemadatan

5.

1 M3 PEKERJAAN URUGAN PASIR Bahan : Pasir 1.2000

Rp. 8,500.00 Total

. = Rp. . = Rp.

8,500.00 8,500.00

Rp. 10,000.00 Total

. = Rp. . = Rp.

10,000.00 10,000.00

Rp. 4,500.00 Total

. = Rp. . = Rp.

4,500.00 4,500.00

Rp. 22,500.00

. = Rp.

27,000.00

Rp. 6,500.00

. = Rp.

6,500.00

. = Rp.

33,500.00

. = Rp.

32,400.00

Total

Rp. 27,000.00

Upah :

1

m3

@

Rp. 4,950.00

m3

@

Rp. 27,000.00

m3

@

Rp. 1,243.13

6. 1 M2 PEKERJAAN URUGAN PASIR TEBAL = 10 CM` Bahan : Pasir 0.1200 Upah :

1

C

PEKERJAAN PASANGAN & PLESTERAN

1.

1 M3 PEKERJAAN PASANGAN PONDASI BATU KALI PECAH ( 1 PC : 6 PS ) Bahan : Batu Kali 1.2000

m3 @ Rp. 35,000.00

Semen (pc) 3.0698

zak @ Rp. 22,000.00

Kapur

-

zak @ Rp. 4,500.00

Pasir Pasang 0.6175

m3 @ Rp. 50,000.00

Upah :

m3 @ Rp. 37,625.00

1

1 M3 PEKERJAAN PASANGAN BATU KALI 2. KOSONG Bahan : Batu Kali 1.2000 Pasir Pasang 0.4500

m3 m3

@ Rp. 35,000.00 @

Rp. 4,950.00 Total

. = Rp. . = Rp.

4,950.00 37,350.00

Rp. 27,000.00

. = Rp.

3,240.00

Rp. 1,243.13 Total

. = Rp. . = Rp.

1,243.13 4,483.13

. 35,000.00

. = Rp.

42000

. 22,000.00

. = Rp.

67535.08

1 PC : 6 PS )

. = Rp.

. 50,000.00

. 37,625.00 Total :

p. 35,000.00

-

. = Rp.

30873.18

. = Rp.

140408.26

. = Rp.

37625

. = Rp.

178033.26

. = Rp. . = Rp.

42000

Rp. 27,000.00

Upah :

1

m3

@ Rp. 24,000.00

1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU TRASRAM (1 PC : 3. 3 PS) Bahan : Batu Bata

Pasir Pasang (Ayak)

77.0000

@ Rp. 180.00

Semen (pc)

0.6077

zak

@ Rp. 22,000.00

Kapur

-

zak

@ Rp. 4,500.00

m3

@ Rp. 50,000.00

m2

@ Rp. 8,100.00

0.0611

Upah :

4.

bh

1

1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU (1 PC : 5 PS) Bahan : Batu Bata Semen (pc) Kapur

70.0000

bh

@ Rp. 180.00

0.4093 zak @ Rp. 22,000.00 - zak @

12150 . = Rp.

54150

. = Rp.

24000

. = Rp.

78150

. 180.00

. = Rp.

13860

p. 22,000.00

. = Rp.

13369.32

p. 4,500.00

. = Rp.

p. 50,000.00

. = Rp.

p. 24,000.00 Total :

. = Rp.

p. 8,100.00 Total

. = Rp.

3,055.84

30285.16 8,100.00

. = Rp.

38385.16

. = Rp.

12600

. = Rp. . = Rp.

9,004.49

-

Rp. 4,500.00 Pasir Pasang (Ayak)

0.0686

m3

@ Rp. 50,000.00

Upah :

1.0000

m2

@ Rp.

1 M' PEKERJAAN ROLLAG BATA (1 PC : 5. 3 PS) Bahan : Batu Bata

14 bh

@ Rp.

Semen (pc)

0.2263

zak

@ Rp.

Pasir Pasang (Ayak)

0.0122

m3

@ Rp.

Upah :

1 m'

@ Rp.

1 M2 PEKERJAAN PLESTERAN (1PC : 5 PS), T = 20 6. MM Bahan : Semen (pc)

0.1428

Kapur

-

zak zak

@ Rp. @ Rp.

Pasir Pasang (Ayak)

0.0239

m3

@ Rp.

Upah :

1.0000

m2

@ Rp.

1 M2 PEKERJAAN PLESTERAN TRASRAM (1 PC : 3 PS) T = 20 7. MM Bahan : Semen (pc)

0.2121

zak

@

Rp. 4,500.00 . = Rp.

3,430.28

. = Rp. 7312.5

25034.77 . = Rp.

7,312.50

. = Rp.

32347.27

180

. = Rp.

2,520.00

22000

. = Rp.

4,978.82

50000

. = Rp. . = Rp.

611.68 8,110.51

3937.5

. = Rp.

3,937.50

. = Rp.

12048.01

22000

. = Rp.

3,142.38

4500

. = Rp.

-

50000

. = Rp. . = Rp.

1,197.10 4,339.48

9130

. = Rp.

9,130.00

. = Rp.

13469.48

Total

Total

Total

. = Rp.

4,665.62

Rp. 22,000.00 Kapur

-

Pasir Pasang (Ayak) Upah :

0.0213 1

zak

@ Rp. 4,500.00

m3

@ Rp. 50,000.00

m2

@ Rp. 9,130.00

1 M2 PEKERJAAN PLESTERAN UNTUK BETON (1 PC : 3 PS) T = 6 8. MM Bahan : Semen (pc)

0.0943

zak

@ Rp. 22,000.00

Kapur

-

zak

@ Rp. 4,500.00

m3

@ Rp. 50,000.00

m2

@ Rp. 9,130.00

zak

@ Rp. 22,000.00

zak

@ Rp. 4,500.00

m3

@ Rp. 50,000.00

m2

@

Pasir Pasang (Ayak) Upah :

0.0095 1

1 M' PEKERJAAN SPONENGAN SUDUT ( 1 PC : 2 9. PS ) Bahan : Semen (pc)

0.0249

Kapur (Mill)

-

Pasir Pasang (Ayak) Upah :

0.0017 1

Rp. 22,000.00

p. 4,500.00

. = Rp.

p. 50,000.00

. = Rp. . = Rp.

1,066.43 5,732.05

p. 9,130.00

. = Rp.

9,130.00

Total

. = Rp.

-

14862.05

p. 22,000.00

. = Rp.

p. 4,500.00

. = Rp.

p. 50,000.00

. = Rp. . = Rp.

473.97 2,547.58

p. 9,130.00

. = Rp.

9,130.00

Total

. = Rp.

p. 22,000.00

. = Rp.

p. 4,500.00

. = Rp.

p. 50,000.00

. = Rp. . = Rp. . = Rp.

2,073.61

-

11677.58

547.39

83.41 630.81 2,750.00

1 M2 PEKERJAAN PENEBALAN PLESTERAN 10. TYPE A Bahan : Semen (pc)

0.0071

Pasir Pasang (Ayak)

0.0012

Upah :

zak

@ Rp. 22,000.00

m3

@ Rp. 50,000.00

1 m2

@ Rp. 8,250.00

1 M2 PEKERJAAN PENEBALAN PLESTERAN 11. TYPE B Bahan : Semen (pc)

0.0114

Pasir Pasang (Ayak)

0.0019

Upah :

zak

@ Rp. 22,000.00

m3

@ Rp. 50,000.00

1 m2

@ Rp. 8,250.00

12. 1 M2 PEKERJAAN LANTAI KERJA ( 1PC : 4 PS) TEBAL 30 MM Bahan : Semen (pc) 0.3414

zak @

Rp.

22,000.00

Pasir Pasang (Ayak) 0.0458

m3 @

Rp.

50,000.00

Upah :

m2 @

Rp.

3,300.00

1

Rp. 2,750.00 Total

Total

Total

Total

. = Rp.

3,380.81

. = Rp.

157.12

. = Rp. . = Rp.

59.85 216.97

. = Rp. . = Rp.

8,250.00 8,466.97

. = Rp.

251.39

. = Rp. . = Rp.

95.77 347.16

. = Rp. . = Rp.

8,250.00 8,597.16

. = Rp.

7510.84

. = Rp.

2289.02

. = Rp.

9799.86

. = Rp.

3300

. = Rp.

13099.86

1 M2 PEKERJAAN LANTAI KERJA ( 1 PC : 3 PS : 5 KR) TEBAL 13. 50 MM Bahan : Semen (pc) 0.3047

zak @

Rp.

22,000.00

Pasir 0.0292

m3 @

Rp.

50,000.00

m3 @

Rp.

50,000.00

m2 @

Rp.

5,720.00

Krikil 0.0266

Upah :

E 1.

1

PEKERJAAN PENUTUP LANTAI DAN DINDING 1M2 PEKERJAAN PASANGAN KERAMIK LANTAI 30/30 Bahan : Keramik Lantai Semen (pc)

1.1000 0.1730

m2

@

Rp. 30,000.00

zak

@

Rp. 22,000.00

Pasir

0.0206

m3

@

Rp. 50,000.00

Semen Grouting

0.1833

m3

@

Rp. 7,500.00

Total

. = Rp.

6702.65

. = Rp.

1462.4

. = Rp.

1327.76

. = Rp.

9492.8

. = Rp.

5720

. = Rp.

15212.8

Rp. 30,000.00

. = Rp.

33000

Rp. 22,000.00

. = Rp.

3805.49

Rp. 50,000.00

. = Rp.

1030.06

Rp. 7,500.00

. = Rp.

1375

Upah :

2.

1

m2

@

1M2 PEKERJAAN PASANGAN KERAMIK KM/WC 20/20 Bahan : Keramik Serit Semen (pc) Pasir

3.

1.1000 0.1730

0.0206

m2

@

zak

@

m3

@

Semen Grouting

0.1833

m3

@

Upah :

1

m2

@

m2

@

zak

@

m3

@

1M2 PEKERJAAN PASANGAN KERAMIK DINDING Bahan : Keramik Dinding Semen (pc) Pasir

1.1000 0.1297

0.0155

Semen Grouting

0.1833

m3

@

Upah :

1

m2

@

. = Rp.

39210.55

. = Rp.

9250

. = Rp.

48460.55

Rp. 35,000.00

. = Rp.

38500

Rp. 22,000.00

. = Rp.

3805.49

Rp. 50,000.00

. = Rp.

1030.06

Rp. 7,500.00

. = Rp.

1375

. = Rp.

44710.55

. = Rp.

9250

. = Rp.

53960.55

Rp. 33,000.00

. = Rp.

36300

Rp. 22,000.00

. = Rp.

2854.12

Rp. 50,000.00

. = Rp.

772.54

Rp. 7,500.00

. = Rp.

1375

. = Rp.

41301.66

. = Rp.

30000

. = Rp.

71301.66

Rp. 9,250.00 Total

Rp. 9,250.00 Total

Rp. 30,000.00 Total

4.

1M' PEKERJAAN PASANGAN KERAMIK PLINT T = 12 CM Bahan : Keramik Dinding Semen (pc) Pasir

5.

0.1667 0.0156

0.0019

m2

@

zak

@

m3

@

Semen Grouting

0.0220

m3

@

Upah :

1

m2

@

1 BH PEKERJAAN PASANGAN KERAMIK ASSESORIES (8 X 20) CM Bahan :

Keramik Assesories

1.1000

Semen (pc) Pasir

6.

0.0021

0.0002

bh

@

zak

@

m3

@

Semen Grouting

0.0029

m3

@

Upah :

1

m2

@

1M2 PEKERJAAN BATU ALAM PADA

Rp. 30,000.00

. = Rp.

5001

Rp. 22,000.00

. = Rp.

342.49

Rp. 50,000.00

. = Rp.

92.71

Rp. 7,500.00

. = Rp.

165

. = Rp.

5601.2

. = Rp.

6800

. = Rp.

12401.2

Rp. 4,000.00

. = Rp.

4400

Rp. 22,000.00

. = Rp.

45.67

Rp. 50,000.00

. = Rp.

12.36

Rp. 7,500.00

. = Rp.

22

. = Rp.

4480.03

. = Rp.

1000

. = Rp.

5480.03

Rp. 6,800.00 Total

Rp. 1,000.00 Total

DINDING Bahan : Batu Alam Semen (pc) Pasir

1.1200 0.1297

0.0155

Upah :

7.

m2 zak m3

1

m2

1M2 PEKERJAAN BATU ALAM SUSUN SIRIH PADA PILAR Bahan : Batu Belah

275.0000

Semen (pc)

0.1297

Pasir

Upah : G 1.

0.0155

bh zak m3

1

m2

PEKERJAAN RANGKA ATAP & PLAFOND 1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. KRUING

@

Rp. 65,000.00 . = Rp.

72800

@

Rp. 22,000.00 . = Rp.

2854.12

@

Rp. 50,000.00 . = Rp.

772.54

. = Rp.

76426.66

Rp. 45,000.00 . = Rp.

45000

@

Total

. = Rp.

121426.66

@

Rp. 500.00 . = Rp.

137500

@

Rp. 22,000.00 . = Rp.

2854.12

@

Rp. 50,000.00 . = Rp.

772.54

. = Rp.

141126.66

Rp. 30,000.00 . = Rp.

30000

@

Total

. = Rp.

171126.66

(Jarak Usuk 40; Jarak Reng 36 cm) Bahan : Balok Kayu 0.0092

m3

@ Rp. 2,800,000.00

Reng Kayu 0.0045

Kg

@ Rp. 1,800,000.00

Paku 0.2000

Kg

@ Rp. 7,000.00

M2

@ Rp. 4,000.00 Total :

Upah :

1

2. 1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. KRUING (Jarak Usuk 45 cm; Jarak Reng 35 cm) Bahan : Balok Kayu 0.0092

m3

@ Rp. 2,800,000.00

Reng Kayu 0.0064

Kg

@ Rp. 1,800,000.00

Paku 0.2000

Kg

@ Rp. 7,000.00

M2

@ Rp. 4,000.00 Total :

Upah :

3.

1

1 M3 PEKERJAAN GORDING, NOG, JURAI, MURPLATE. KAYU BANGKIRAI 8/12 Bahan : Balok Kayu

m3

@

@ Rp. 2,800,000.00

. = Rp.

25,872.00

@ Rp. 1,800,000.00

. = Rp.

8,188.71

. = Rp. . = Rp.

1,400.00 35,460.71

. = Rp. . = Rp.

4,000.00 39,460.71

@ Rp. 2,800,000.00

. = Rp.

25,872.00

@ Rp. 1,800,000.00

. = Rp.

11,583.00

. = Rp. . = Rp.

1,400.00 38,855.00

. = Rp. . = Rp.

4,000.00 42,855.00

BANGKIRAI 8/12 . = Rp.

3,080,000.00

1.1 Baut 50.0833

Rp. 2,800,000.00 bh

@ Rp. 1,500.00

m3

@ Rp. 430,000.00

Papan Kayu 0.0044

m3

@ Rp. 3,000,000.00

Paku 0.0200

bh

@ Rp. 7,000.00

m`

@ Rp. 1,500.00

Upah :

1

1 M` PEKERJAAN PAPAN RUITER KAYU BANGKIRAI 4. 2/20 Bahan :

Upah :

1

1 M` PEKERJAAN PAPAN LISJPLANK TUNGGAL KAYU BANGKIRAI 5. 2/25 Bahan : Papan Kayu 0.0055

m3

@ Rp. 3,000,000.00

Paku 0.0200

bh

@ Rp. 7,000.00

m`

@ Rp. 7,250.00

Upah : 6.

1

1 M` PEKERJAAN PAPAN LISJPLANK DOUBLE KAYU BANGKIRAI 2/20; 2/25 Bahan : Papan Kayu 0.0110

m3

@ Rp. 3,000,000.00

Paku 0.0400

bh

@ Rp. 7,000.00

m`

@ Rp. 14,500.00

Upah :

1

Rp. 2,800,000.00

@ Rp. 1,500.00

. = Rp. . = Rp.

75,125.00 3,155,125.00

@ Rp. 430,000.00 Total :

. = Rp. . = Rp.

430,000.00 3,585,125.00

@ Rp. 3,000,000.00

. = Rp.

13,200.00

@ Rp. 7,000.00

. = Rp. . = Rp.

140.00 13,340.00

@ Rp. 1,500.00 Total :

. = Rp. . = Rp.

1,500.00 14,840.00

@ Rp. 3,000,000.00

. = Rp.

16,500.00

@ Rp. 7,000.00

. = Rp. . = Rp.

140.00 16,640.00

@ Rp. 7,250.00 Total :

. = Rp. . = Rp.

7,250.00 23,890.00

IRAI 2/20; 2/25

@ Rp. 3,000,000.00

. = Rp.

33,000.00

@ Rp. 7,000.00

. = Rp. . = Rp.

280.00 33,280.00

@ Rp. 14,500.00 Total :

. = Rp. . = Rp.

14,500.00 47,780.00

1M' PEKERJAAN TALANG ZENG; PAPAN KAYU 7. MERANTI Bahan : Seng BJLS 30 1.1000

m'

Papan Kayu Meranti 0.0176

m3

Paku Seng (Payung) 10.0000

buah

Paku 0.2000 Upah :

kg 1 m'

1 M' PEKERJAAN WENVIR 8 DENGAN SENG Bahan : Seng Papan Kayu Meranti

1.1 m' 0 m3

Paku

Upah :

0.02 kg

1 m'

1 M2 PEKERJAAN RANGKA PLAFOND KY KRUING - PENUTUP 9. GYPSUM Rangka = 60 x 60 CM Bahan : Gypsum 0.3819 Balok Kayu 0.0136

m3 Paku 0.2000

Paku Plepet 0.0200

m3

Kg Kg

@ Rp. 24,000.00 @ Rp. 1,400,000.00

. = Rp. . = Rp.

26,400.00 24,640.00

@ Rp. 150.00

. = Rp.

1,500.00

@ Rp. 7,000.00

. = Rp. . = Rp.

1,400.00 53,940.00

@ Rp. 7,750.00

. = Rp. Total . = Rp.

7,750.00 61,690.00

@ Rp. 8,000.00

. = Rp.

8,800.00

@ Rp. 1,400,000.00

. = Rp.

3,640.00

@ Rp. 7,000.00

. = Rp. . = Rp.

140.00 12,580.00

@ Rp. 5,000.00

. = Rp. Total . = Rp.

5,000.00 17,580.00

@ Rp. 35,000.00

. = Rp.

13,368.06

@ Rp. 1,800,000.00

. = Rp.

24,552.00

@ Rp. 7,000.00

. = Rp.

1,400.00

@ Rp. 8,000.00

. = Rp. . = Rp.

160.00 39,480.06

Upah :

1 m2

10. 1 M2 PEKERJAAN RANGKA PLAFOND - PENUTUP CALSIBOARD Rangka = 100 x 100 CM Bahan : Calsiboard 0.3819

m3

Balok Kayu 0.0092

m3 Paku 0.2000

Kg

Paku Plepet 0.0200

Kg Upah :

1 m2

Lis Gypsium L=10 cm 1.0000

m3

1 M' PEKERJAAN LIS GYPSIUM LEBAR : 10 11. CM Bahan dan Upah :

H

PEKERJAAN PENUTUP ATAP & PLAFOND.

1.

1 M2 PEKERJAAN PENUTUP ATAP GENTENG KERAMIK SOKKA TYPE MORANDO Bahan :

Genteng Keramik

9.9000

Upah :

2.

bh

@

Rp.

1.0000 m2

@

Rp.

1 M' PEKERJAAN KERPUS GENTENG KERAMIK SOKKA TYPE MORANDO SE, BES Bahan :

@ Rp. 13,000.00 Total :

. = Rp. . = Rp.

13,000.00 52,480.06

@ Rp. 30,000.00

. = Rp.

11,458.33

@ Rp. 1,800,000.00

. = Rp.

16,632.00

@ Rp. 7,000.00

. = Rp.

1,400.00

@ Rp. 8,000.00

. = Rp. . = Rp.

160.00 29,650.33

@ Rp. 7,200.00 Total :

. = Rp. . = Rp.

7,200.00 36,850.33

m' Rp. 8,000.00

. = Rp.

8,000.00

Total :

. = Rp.

8,000.00

. = Rp.

20790

. = Rp.

20790

. = Rp.

7050

. = Rp.

27840

KA TYPE MORANDO SE, BESAR

2,100.00

7,050.00

Total : MORANDO SE, BESAR

Genteng Kerpus Semen Pasir

Upah : F 1.

2.

3.

3.3000 m3

@

0.2601 m3 0.0366 Kg

Rp. @

@

1.0000 m2

Rp. Rp.

@

Rp.

PEKERJAAN KUSEN DAN DAUN PINTU JENDELA 1 M3 PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12 Bahan : Balok Kayu 1.1000 Paku 5.0000

m3 Kg

@ @

Upah :

m3

@

1

1 M' PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12 Bahan : Balok Kayu 0.0087 Paku 0.0360

m3 Kg

@ @

Upah :

m'

@

1

1 M3 PEKERJAAN KREPYAK KAYU JATI UNTUK KUSEN Bahan : Papan Kayu 1.1000 Paku 5.0000

m3 Kg

@ @

Upah :

m3

@

m3 Kg

@ @

1

1 BH DAUN PINTU PANIL 3,5 X 82 X 200 4. CM Bahan : Papan Kayu 0.0631 Lem 0.1500

4,000.00

. = Rp.

13200

22,000.00

. = Rp.

5722.54

50,000.00

. = Rp.

1831.21

. = Rp.

20753.76

. = Rp.

17037.5

. = Rp.

37791.26

17,037.50

Total :

Rp. Rp. Rp.

6,000,000.00 7,000.00

. = Rp. . = Rp.

6,600,000.00 35,000.00

1,730,000.00 Total :

. = Rp. . = Rp. . = Rp.

6,635,000.00 1,730,000.00 8,365,000.00

Total :

. = Rp. . = Rp. . = Rp. . = Rp. . = Rp.

52,272.00 252.00 52,524.00 12,456.00 64,980.00

Total :

. = Rp. . = Rp. . = Rp. . = Rp. . = Rp.

8,800,000.00 35,000.00 8,835,000.00 1,620,000.00 10,455,000.00

. = Rp. . = Rp.

504,800.00 1,200.00

Rp. Rp.

6,000,000.00 7,000.00

Rp.

12,456.00

Rp. Rp.

8,000,000.00 7,000.00

Rp.

1,620,000.00

Rp. Rp.

8,000,000.00 8,000.00

Upah :

1

bh

@

m3 Kg

@ @

bh

@

m3 Kg

@ @

bh

@

1 BH DAUN PINTU PANIL 3 X 74 5. X 200 CM Papan Kayu

Bahan : 0.0488 Lem 0.1500 Upah :

1

1 BH DAUN PINTU PANIL 3 X 61 6. X 200 CM Papan Kayu

Bahan : 0.0403 Lem 0.1500 Upah :

1

1 BH DAUN JENDELA 52 X 150 CM; KAYU JATI 7. POLITUR Bahan : Ram Kayu 3,5 cm Kaca Bening 5 mm

0.0156 0.4725 Upah :

1

m3

@

m2

@

bh

@

m3

@

m2

@

bh

@

1 BH DAUN JENDELA 62 X 116 CM; KAYU JATI 8. POLITUR Bahan : Ram Kayu 3,5 cm Kaca Bening 5 mm

0.0137 0.4500 Upah :

1

. = Rp. . = Rp. . = Rp.

506,000.00 184,740.00 690,740.00

. = Rp. . = Rp. . = Rp. . = Rp. . = Rp.

390,400.00 1,200.00 391,600.00 179,020.00 570,620.00

322,400.00 1,200.00 323,600.00 175,620.00 499,220.00

Rp.

184,740.00 Total :

Rp. Rp.

8,000,000.00 8,000.00

Rp.

179,020.00 Total :

Rp. Rp.

8,000,000.00 8,000.00

Rp.

175,620.00

. = Rp. . = Rp. . = Rp. . = Rp.

Total :

. = Rp.

Rp. 8,000,000.00

. = Rp.

124,800.00

Rp. 60,000.00 . = Rp. . = Rp.

28,350.00 153,150.00

Rp. 70,000.00 . = Rp. Total : . = Rp.

70,000.00 223,150.00

Rp. 8,000,000.00

. = Rp.

109,600.00

Rp. 60,000.00 . = Rp. . = Rp.

27,000.00 136,600.00

Rp. 70,000.00 . = Rp.

70,000.00

Total : 1 BH DAUN JENDELA 62 X 166 CM; KAYU JATI 9. POLITUR Bahan : Ram Kayu 3,5 cm Kaca Bening 5 mm

0.0176 0.6750

Upah :

10.

1

m3

@

Rp. 8,000,000.00

m2

@

Rp. 60,000.00

bh

@

Rp. 70,000.00 Total :

bh

@

Rp. 45,000.00

bh

@

Rp. 1,000.00 Total :

m2

@

Rp. 70,000.00

1 BH ROSTER KAYU 30 X 40 CM Bahan : Roster Kayu

1.0000

Upah :

1

1 M2 PEKERJAAN KACA ES UNTUK 11. BOVEN Bahan dan Upah : Kaca Es 5mm Lis Kayu J 1.

1.0000

4.0000

m'

@

Rp. 3,000.00 Total :

Cat Kayu 0.2750

Kg

@ Rp. 33,000.00

Plamur Kayu 0.1375

Kg

@ Rp. 9,700.00

Dempul Jadi 0.5000 Thiner

bh @ Rp. 1,000.00 ltr @

PEKERJAAN CAT DAN POLITUR 1 M2 PENGECATAN KAYU BARU Bahan :

.

Rp. 8,000,000.00

. = Rp.

. = Rp.

206,600.00

140,800.00

Rp. 60,000.00

. = Rp. . = Rp.

40,500.00 181,300.00

Rp. 70,000.00

. = Rp. . = Rp.

70,000.00 251,300.00

Rp. 45,000.00

. = Rp. . = Rp.

45,000.00 45,000.00

Rp. 1,000.00

. = Rp. . = Rp.

1,000.00 46,000.00

Rp. 70,000.00

. = Rp.

70,000.00

Rp. 3,000.00

. = Rp. . = Rp.

12,000.00 82,000.00

. 33,000.00

. = Rp.

9,075.00

. 9,700.00

. = Rp.

1,333.75

. 1,000.00

. = Rp. . = Rp.

500.00 1,125.00

0.25 Amplas 1.0000

Rp. 4,500.00 lbr

Upah :

1 bh

@ Rp. 1,250.00 @ Rp. 12,960.00

1M2 PEKERJAAN MENI BIDANG KAYU 2 BARU Bahan : Menie Jadi Upah :

0.28 kg

@ Rp. 6,000.00

1.0000 m2 @ Rp. 3,190.00

1M2 PEKERJAAN PENGECATAN KAYU 3 BARU Bahan dan Upah: Cat-catan

1.0000 m2 @ Rp. 26,243.75

Menie

1.0000 m2 @ Rp. 4,840.00

4 1M2 PEKERJAAN PENGECATAN TEMBOK DGN CAT CATYLAC (Untuk Eksterior dan Plafon) Bahan : Cat Tembok Catylac

0.18 kg

@ Rp. 10,000.00

Plamur Jadi

0.05 kg

@ Rp. 5,800.00

Amplas

0.25 lbr

@ Rp. 1,250.00

Upah :

1.0000 m2 @ Rp. 4,846.88

5 1M2 PEKERJAAN POLITUR UNTUK KUSEN DAN DAUN PINTU DAN JENDEL Bahan :

Rp. 4,500.00

. 1,250.00

. = Rp. . = Rp.

1,250.00 13,283.75

. 12,960.00 Total :

. = Rp. . = Rp.

12,960.00 26,243.75

@ Rp. 6,000.00

. = Rp. . = Rp.

1,650.00 1,650.00

. = Rp. . = Rp.

3,190.00 4,840.00

. = Rp.

26,243.75

. = Rp.

4,840.00

. = Rp.

31,083.75

@ Rp. 10,000.00

. = Rp.

1,830.00

@ Rp. 5,800.00

. = Rp.

266.80

@ Rp. 1,250.00

. = Rp. . = Rp.

312.50 2,409.30

. = Rp. . = Rp.

4,846.88 7,256.18

Total

Total

Total

PINTU DAN JENDELA

Sirlak

0.03 kg

@ Rp. 60,000.00

Spirtus

0.55 kg

@ Rp. 6,000.00

Batu Apung

0.37 kg

@ Rp. 4,000.00

Upah :

1.0000 m2 @ Rp. 18,562.50 Total

D

PEKERJAAN BETON BERTULANG

1.

1M3 PEKERJAAN COR BETON UNTUK SLOOF, SKELET DAN RING BALOK; DGN M Bahan : Semen (pc) 8.5150

zak @ Rp. 22,000.00

Pasir Beton 0.5450

m3 @ Rp. 50,000.00

Kerikil 0.8174

m3 @ Rp. 50,000.00

Upah :

1 m3 @ Rp. 47,250.00 Total

2 1Kg. PEMBESIAN U-24 (Alat Gunting) Bahan : Besi Beton 1.1000 kg @ Rp. 4,500.00 Bendrat (kawat beton) 0.0200 kg @ Rp. 8,000.00

Upah :

1.0000 m3 @ Rp. 428.88 Total

3 1M2 PEKERJAAN BEKESTING UNTUK SKELET, SLOOF DAN RING BALOK DENGAN PAPAN SENGON Bahan :

. = Rp.

1,650.00

. = Rp.

3,300.00

. = Rp. . = Rp.

1,466.80 6,416.80

. = Rp. . = Rp.

18,562.50 24,979.30

RING BALOK; DGN MOLEN

F DAN RING BALOK

. = Rp.

187329.7

. = Rp.

27247.96

. = Rp.

40871.93

. = Rp.

255449.59

. = Rp.

47250

. = Rp.

302699.59

. = Rp.

4950

. = Rp.

160

. = Rp.

5110

. = Rp.

428.88

. = Rp.

5538.88

Papan sengon Paku

Upah :

2.7500 lbr @ Rp. 3,000.00 0.2000 kg @ Rp. 7,000.00

1.0000 m2 @ Rp. 1,750.00

1 LS PERANCAH BETON DARI BAMBU UNTUK 1M3 PLAT TEBAL 4 12 CM Rangka (0,6 x 0,6) m. Bahan : Balok Kayu/ Bambu 55.0000 btg @ Rp. 4,500.00 Paku

Upah :

1.6600 kg @ Rp. 7,000.00

1

ls

@ Rp. 24,990.00

1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK 5 SLOOF 15/20 (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton

1.0000 m3 @ Rp. 302,699.59

Besi Beton U-24 100.0000 kg @ Rp. 5,538.88 Bekesting

5.0000 m2 @ Rp. 11,400.00

6 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SKELET 15/15 (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton 1.0000 m3 @ Rp. 302,699.59 Besi Beton U-24 120.0000 kg

Total

. = Rp.

8250

. = Rp.

1400

. = Rp.

9650

. = Rp.

1750

. = Rp.

11400

. = Rp.

247500

. = Rp.

11620

. = Rp.

259120

. = Rp.

24990

. = Rp.

284110

. = Rp.

302699.59

. = Rp.

553887.5

. = Rp.

57000

. = Rp.

913587.09

. = Rp. . = Rp.

302699.59

AT TEBAL

@ Rp. 24,990.00 Total

Total

NTUK SKELET 15/15

@ Rp. 5,538.88 Bekesting 5.0000 m2 @ Rp. 11,400.00

7 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK BALOK RING 1 (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton

1.0000 m3 @ Rp. 302,699.59

Besi Beton U-24 120.0000 kg @ Rp. 5,538.88 Bekesting 5.0000 m2 @ Rp. 11,400.00

1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK 8 CANOPY (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton

1.0000 m3 @ Rp. 302,699.59

Besi Beton U-24 125.0000 kg @ Rp. 5,538.88 Bekesting 5.0000 m2 @ Rp. 11,400.00 Perancah Bambu M

0.5000 ls @ Rp. 284,110.00

PEKERJAAN SANITASI DAN DRAINASI 1 1 M' PEKERJAAN INSTALASI AIR BERSIH Bahan : Pipa PVC 3/4\"

0.28

Sock

0.28

Knee

0.19

Lem PC

0.1

664665

Total

. = Rp.

57000

. = Rp.

1,024,364.59

. = Rp.

302699.59

. = Rp.

664665

. = Rp.

57000

. = Rp.

1,024,364.59

. = Rp.

302699.59

. = Rp.

692359.38

. = Rp.

57000

. = Rp.

142055

. = Rp.

1,194,113.97

NTUK BALOK RING 15/15

Total

Total

btg

@ Rp.

14,000.00

. = Rp.

3,850.00

bh

@ Rp.

2,000.00

. = Rp.

550.00

bh

@ Rp.

2,500.00

. = Rp.

468.75

tube

@ Rp.

3,500.00

. = Rp. . = Rp.

350.00 5,218.75

3,850.00 550.00 468.75 350.00 5,218.75

Upah :

1

m'

2 1 M' PEKERJAAN INSTALASI AIR KOTOR DAN AIR BEKAS Bahan : Pipa PVC 3\"

0.28

btg

Sock

0.28

bh

Knee

0.19

bh

Lem PVC Upah :

0.2 1

tube m'

3 1 UNIT PEKERJAAN PASANG CLOSET DUDUK Bahan : Closet Duduk Monoblok Upah :

1

set

1

unit

4 1 UNIT PEKERJAAN PASANG CLOSET JONGKOK Bahan : Closet Jongkok

1

bh

Dudukan closet

1

ls

Upah :

1

unit

5 1 UNIT PEKERJAAN PASANG WASHTAFEL Bahan : Washtafel

1

set

@ Rp.

2,500.00 Total

. = Rp. . = Rp.

2,500.00 7,718.75

@ Rp.

85,000.00

. = Rp.

23,375.00

@ Rp.

5,000.00

. = Rp.

1,375.00

@ Rp.

7,800.00

. = Rp.

1,462.50

@ Rp.

3,500.00

. = Rp. . = Rp.

700.00 26,912.50

@ Rp.

5,000.00

. = Rp. . = Rp.

5,000.00 31,912.50

Total

@ Rp.

1,000,000.00

. = Rp. . = Rp.

1,000,000.00 1,000,000.00

@ Rp.

72,600.00

. = Rp.

72,600.00

. = Rp.

1,072,600.00

Total

@ Rp.

74,500.00

. = Rp.

74,500.00

@ Rp.

25,000.00

. = Rp. . = Rp.

25,000.00 99,500.00

@ Rp.

36,300.00

. = Rp. . = Rp.

36,300.00 135,800.00

. = Rp.

200,000.00

Total

@ Rp.

200,000.00

Upah :

1

unit

6 1 UNIT PEKERJAAN PASANG WALL SHOWER Bahan : Wallshower Upah :

1

set

1

unit

7 1 BH PEKERJAAN PASANG FLOOR DRAIN Bahan : Floordrain 1.0000

Upah :

bh

@ Rp. 10,000.00

1 unit

@ Rp. 9,000.00

1 BH PEKERJAAN PASANG AVOR (KURASAN 8 BAK) Bahan : Avor 1.0000

Upah :

bh

@ Rp. 5,000.00

1 unit

@ Rp. 9,000.00

bh

@ Rp. 15,000.00

bh

@ Rp. 2,500.00

1 BH PEKERJAAN KERAN 9 AIR Bahan : Keran Air (rata-rata) 1.0000 Knee 1.0000

@ Rp.

72,600.00 Total

. = Rp.

200,000.00

. = Rp. . = Rp.

72,600.00 272,600.00

@ Rp.

50,000.00

. = Rp. . = Rp.

50,000.00 50,000.00

@ Rp.

15,125.00

. = Rp. . = Rp.

15,125.00 65,125.00

Total

@ Rp. 10,000.00

. = Rp.

10000

. = Rp.

10000

. = Rp.

9000

. = Rp.

19000

. = Rp.

5000

. = Rp.

5000

. = Rp.

9000

. = Rp.

14000

@ Rp. 15,000.00

. = Rp.

15000

@ Rp. 2,500.00

. = Rp.

2500

@ Rp. 9,000.00 Total

@ Rp. 5,000.00

@ Rp. 9,000.00 Total

Isolasi 1.0000

Upah :

bh

@ Rp. 1,000.00

1 m'

@ Rp. 3,600.00

1 BH PEKERJAAN KERAN AIR UNTUK 10 DAPUR Bahan : Keran Air (rata-rata) 1.0000

bh

@ Rp. 25,000.00

Knee 1.0000

bh

@ Rp. 2,500.00

Isolasi 1.0000

bh

@ Rp. 1,000.00

1 m'

@ Rp. 3,600.00

Upah :

1 BH PEKERJAAN PASANG SOAP HOLDER 11 TANAM Bahan : Soap Holder 1.0000

Upah :

bh

@ Rp. 25,000.00

1 unit

@ Rp. 15,125.00

1 UNIT PEKERJAAN PASANG BATH 12 UP Bahan : Bath Up 1.0000

set

@ Rp. 1,250,000.00

@ Rp. 1,000.00

. = Rp.

1000

. = Rp.

18500

. = Rp.

3600

. = Rp.

22100

@ Rp. 25,000.00

. = Rp.

25000

@ Rp. 2,500.00

. = Rp.

2500

@ Rp. 1,000.00

. = Rp.

1000

. = Rp.

28500

. = Rp.

3600

. = Rp.

32100

. = Rp.

25000

. = Rp.

25000

. = Rp.

15125

. = Rp.

40125

@ Rp. 3,600.00 Total

@ Rp. 3,600.00 Total

@ Rp. 25,000.00

@ Rp. 15,125.00

@ Rp. 1,250,000.00

Total

. = Rp.

1,250,000.00

. = Rp.

1,250,000.00

Upah :

1 unit

@ Rp. 93,750.00 Total

1 UNIT PEKERJAAN BIKIN BAK 13 KONTROL Bahan : Bak Kontrol 1.0000

Upah :

unit

1 ls

@ Rp. 200,000.00

@ Rp. 52,000.00 Total

14 1 UNIT PEKERJAAN SUMUR RESAPAN DENGAN BUIS BETON Bahan : Sumur Resapan 1.0000

Upah :

unit

1 ls

@ Rp. 750,000.00

@ Rp. 100,000.00 Total

15 1 UNIT PEKERJAAN SEPTIC TANK Bahan : Septictank 1.0000

Upah :

unit

1 ls

@ Rp. 1,500,000.00

@ Rp. 350,000.00 Total

16 1 UNIT PEKERJAAN INSTALASI SUMUR AIR BERSIH + POMPA Bahan + Upah

@ Rp. 93,750.00

@ Rp. 200,000.00

@ Rp. 52,000.00

@ Rp. 750,000.00

@ Rp. 100,000.00

@ Rp. 1,500,000.00

@ Rp. 350,000.00

. = Rp.

93750

. = Rp.

1,343,750.00

. = Rp.

200000

. = Rp.

200000

. = Rp.

52000

. = Rp.

252000

. = Rp.

750000

. = Rp.

750000

. = Rp.

100000

. = Rp.

850000

. = Rp.

1,500,000.00

. = Rp.

1,500,000.00

. = Rp.

350000

. = Rp.

1,850,000.00

Instalasi sumur air bersih + pompa 1.0000 unit

@ Rp. 1,000,000.00

. = Rp.

@ Rp. 1,000,000.00

. = Rp.

1 UNIT PEKERJAAN INSTALASI WATER 17 TORN Bahan + Upah Instalasi water torn 1.0000 unit M

PEKERJAAN PERKERASAN JALAN 1 1M2 PEKERJAAN PERKERASAN JALAN DENGAN PAVING BLOK (Dengan 2 lapis pondasi) Bahan : Paving Blok1.1000 m2 @

Rp.

14,000.00

Pasir Beton0.1200 m3 @

Rp.

50,000.00

Sirtu

0.1200 m3 @

Rp.

30,000.00

Pasir urug 0.1350 m3 @

Rp.

27,000.00

Batu Belah 0.3000 m3 @

Rp.

35,000.00

Upah :

Rp.

10,725.00

1.0000 m2 @

1M' PEKERJAAN KANSTEN 2 (25x25x40) CM Bahan : Kansten

1.1000 m' @

Rp.

27,400.00

Pasir Beton0.0300 m3 @

Rp.

50,000.00

Sirtu

0.0300 m3 @

Rp.

30,000.00

Pasir urug 0.0297 m3 @

Rp.

27,000.00

000,000.00

000,000.00

. = Rp. Total

1,000,000.00

. = Rp.

1,000,000.00

. = Rp.

1,000,000.00

Total

. = Rp.

Total

.= Rp. .= Rp. .= Rp. .= Rp. .= Rp. .= Rp. .= Rp. .= Rp.

1,000,000.00

ING BLOK

.= Rp. .= Rp. .= Rp. .= Rp.

15,400.00 6,000.00 3,600.00 3,645.00 10,500.00 39,145.00 10,725.00 49,870.00

30,140.00 1,500.00 900.00 801.90

O

Batu Belah 0.0660 m3 @

Rp.

35,000.00

Upah :

Rp.

3,431.25

1.0000 m2 @

PEKERJAAN PEMBERSIHAN AKHIR PROYEK 1 LS PEMBERSIHAN AKHIR 1 PROYEK Upah :

1.00

DAFTAR ANALISIS

ls.

@

Rp.

200,000.00

Total

.= Rp. .= Rp. .= Rp. .= Rp.

.= Rp.

2,310.00 35,651.90 3,431.25 39,083.15

200,000.00

HARGA SATUAN PEKERJAAN (HSP) - DENGAN OVER HEAD PROYEK : SAMPLE LOKASI : SAMPLE

A 1.

PEKERJAAN PERSIAPAN MOBILISASI Upah :

1

ls.

@ Rp. 200,000.00

1

m2

@ Rp. 3,189.56

Papan Sengon 0.5500

Lbr

@ Rp. 3,000.00

Balok Kayu 0.0060

m3

@ Rp. 1,200,000.00

Paku 0.0200

Kg.

@ Rp. 7,000.00

1M2 PEMBERSIHAN LOKASI 2. PROYEK Upah : 1 M' PEKERJAAN UITZET & 3. BOUWPLANK Bahan :

Upah :

4.

1

M`

@ Rp. 3,986.95

Zeng 1.2500

Lbr

@ Rp. 8,000.00

Balok Kayu 0.0300

m3

@ Rp. 1,200,000.00

.=

1 M' PEMAGARAN LOKASI PROYEK Bahan :

Paku Zeng 12.5000 Paku 0.0200

bh.

@ Rp. 150.00 Kg.

@ Rp. 7,000.00

.=

. = Rp.

200,000.00

. = Rp.

3,189.56

. = Rp.

1,650.00

p. 1,200,000.00

. = Rp.

7,200.00

. = Rp. . = Rp.

140.00 8,990.00

. = Rp. Total . = Rp.

3,986.95 12,976.95

. = Rp.

10,000.00

p. 1,200,000.00

. = Rp.

36,000.00

. = Rp.

1,875.00

. = Rp. . = Rp.

140.00 48,015.00

Upah :

1 M`

@ Rp. 6,644.91

1 M2

@ Rp. 100,000.00

1 M2 PEKERJAAN DIREKSI 5. KIT Bahan & Upah :

1 M2 PEKERJAAN PEMBUATAN BRAK UNTUK 6. GUDANG Bahan & Upah :

7.

1 m2

@ Rp. 100,000.00

ADMINISTRASI DAN DOKUMENTASI Bahan & Upah : PEKERJAAN TANAH DAN PASIR

B

1 ls.

@ Rp. 150,000.00

1 M3 PEKERJAAN GALIAN 1. TANAH BIASA Untuk Pondasi Batu Kali Upah :

1

m3 @ Rp. 11,296.35

1 M3 PEKERJAAN GALIAN TANAH s.d. 2. -2 M Untuk Foot Plate Upah :

1

m3 @ Rp. 13,289.82

1 M3 PEKERJAAN URUGAN TANAH 3. KEMBALI Upah : *) *). Termasuk Pemadatan 4.

1 M3 PEKERJAAN URUGAN

1

m3 @ Rp. 5,980.42

. = Rp. Total . = Rp.

6,644.91 54,659.91

. = Rp.

100,000.00

. = Rp.

100,000.00

. = Rp.

150,000.00

. = Rp. Total

11296.35 . = Rp.

. = Rp. Total

13289.82 . = Rp.

. = Rp. Total

11296.35

13289.82

5980.42 . = Rp.

5980.42

TANAH Dengan Mendatangkan Tanah dari Luar Bahan : Tanah Urug 1.2000 Upah : *)

m3 @ Rp. 22,500.00 1

m3 @ Rp. 8,638.38

*). Termasuk Pemadatan 1 M3 PEKERJAAN URUGAN 5. PASIR Bahan : Pasir 1.2000

m3 @ Rp. 27,000.00

Upah :

1

m3 @ Rp. 6,578.46

1 M2 PEKERJAAN URUGAN 6. PASIR TEBAL = 10 CM` Bahan : Pasir 0.1200

m3 @ Rp. 27,000.00

Upah : C 1.

1

m3 @ Rp. 1,461.88

PEKERJAAN PASANGAN & PLESTERAN 1 M3 PEKERJAAN PASANGAN PONDASI BATU KALI PECAH ( 1 PC : 6 PS ) Bahan : Batu Kali

1.2000 m3 @ Rp. 35,000.00

Semen (pc)

3.0698 zak @ Rp. 22,000.00

Kapur Pasir Pasang

-

zak @ Rp. 4,500.00 0.6175

. = Rp.

27000

. = Rp.

8638.38

Total

. = Rp.

35638.38

. = Rp.

32400

. = Rp.

6578.46

Total

. = Rp.

38978.46

. = Rp.

3240

. = Rp.

1461.88

Total

. = Rp.

4701.88

1 PC : 6 PS )

. = Rp.

42000

. = Rp.

67535.08

. = Rp. . = Rp.

-

m3 @ Rp. 50,000.00

Upah :

1.0000 m3 @ Rp. 50,002.95 Total :

1 M3 PEKERJAAN PASANGAN BATU KALI 2. KOSONG Bahan : Batu Kali

1.2000 m3 @ Rp. 35,000.00

Pasir Pasang

Upah :

0.4500 m3 @ Rp. 27,000.00

1.0000 m3 @ Rp. 31,895.57 Total :

1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU TRASRAM (1 3. PC : 3 PS) Bahan : Batu Bata

77.0000

Semen (pc) Kapur Pasir Pasang (Ayak)

bh @ Rp. 180.00

0.6077 zak @ Rp. 22,000.00

zak -@ Rp. 4,500.00

0.0611 m3 @ Rp. 50,000.00

Upah :

1.0000 m2 @ Rp. 10,764.76 Total

4.

1 M2 PEKERJAAN PASANGAN BATA 1/2 BATU (1 PC : 5 PS) Bahan : Batu Bata

70.0000

bh @ Rp. 180.00

30873.18 . = Rp.

140408.26

. = Rp.

50002.95

. = Rp.

190411.22

. = Rp.

42000

. = Rp.

12150

. = Rp.

54150

. = Rp.

31895.57

. = Rp.

86045.57

. = Rp.

13860

. = Rp.

13369.32

. = Rp.

-

. = Rp.

3055.84

. = Rp.

30285.16

. = Rp.

10764.76

. = Rp.

41049.92

. = Rp.

12600

Semen (pc)

0.4093 zak @ Rp. 22,000.00

Kapur

-

zak @ Rp. 4,500.00

Pasir Pasang (Ayak)

Upah :

0.0686 m3 @ Rp. 50,000.00

1.0000 m2 @ Rp. 9,718.18

1 M' PEKERJAAN ROLLAG BATA (1 PC 5. : 3 PS) Bahan : Batu Bata Semen (pc)

14.0000

0.2263 zak @ Rp. 22,000.00

Pasir Pasang (Ayak)

Upah :

6.

bh @ Rp. 180.00

0.0122 m3 @ Rp. 50,000.00

1.0000

m' @ Rp. 5,232.87

1 M2 PEKERJAAN PLESTERAN (1PC : 5 PS) T = 20 MM

Bahan : Semen (pc)

zak @ Rp. 22,000.00 . = Rp. 0.14 Kapur - zak @ Rp. 4,500.00 . = Rp. Pasir Pasang (Ayak) m3 @ Rp. 50,000.00 . = Rp. 0.02 Upah :

m2

@ Rp.

12,133.61 . = Rp.

1 7. 1 M2 PEKERJAAN PLESTERAN TRASRAM (1 PC : 3 PS) T = 20 MM Bahan : Semen (pc) 0.21

. = Rp.

9004.49

. = Rp.

Total

Total

-

. = Rp.

3430.28

. = Rp.

25034.77

. = Rp.

9718.18

. = Rp.

34752.95

. = Rp.

2520

. = Rp.

4978.82

. = Rp.

611.68

. = Rp.

8110.51

. = Rp.

5232.87

. = Rp.

13343.37

3,142.38

1,197.10

. = Rp.

Total

4,339.48 12,133.61

. = Rp.

16,473.09

zak @ Rp.

. = Rp. 22000

4665.62

Kapur

- zak @ Rp.

4,500.00 . = Rp.

Pasir Pasang (Ayak) 0.02

Upah : 1

8. 1 M2 PEKERJAAN PLESTERAN UNTUK BETON (1 Bahan : Semen (pc) Kapur

- zak @ Rp.

0.09 4,500.00 . = Rp.

Pasir Pasang (Ayak) 0.01

Upah : 1

9. 1 M' PEKERJAAN SPONENGAN SUDUT ( 1 PC : 2 PS ) Bahan : Semen (pc) Kapur (Mill)

- zak @ Rp.

0.02 4,500.00 . = R

Pasir Pasang (Ayak) 0

Upah : 1

10. 1 M2 PEKERJAAN PENEBALAN PLESTERAN TYP

4,500.00 . = Rp. m3 @ Rp. . = Rp. 50000 . = Rp.

1066.43 5732.05

m2 @ Rp. . = Rp. 12133.61 Total . = Rp.

12133.61 17865.65

N UNTUK BETON (1 PC : 3 PS) T = 6 MM zak @ Rp. . = Rp. 22000 4,500.00 . = Rp.

2073.61 -

m3 @ Rp. . = Rp. 50000

473.97

. = Rp. 2547.58 m2 @ Rp. . = Rp. 12133.61 Total . = Rp.

12133.61 14681.18

N SUDUT ( 1 PC :

zak @ Rp. . = Rp. 22000 4,500.00 . = Rp.

547.39 -

m3 @ Rp. . = Rp. 50000 . = Rp.

83.41 630.81

m2 @ Rp.

3,654.70 . = Rp. 3654.7

Total

AN PLESTERAN TYPE A

. = Rp. 4285.51

Bahan : Semen (pc) 0.01 Pasir Pasang (Ayak) 0

Upah : 1

11. 1 M2 PEKERJAAN PENEBALAN PLESTERAN TYP Bahan : Semen (pc) 0.01 Pasir Pasang (Ayak) 0

Upah : 1

12. 1 M2 PEKERJAAN LANTAI KERJA ( 1PC : 4 PS) T Bahan : Semen (pc) 0.34 Pasir Pasang (Ayak) 0.05

Upah : 1

13. 1 M2 PEKERJAAN LANTAI KERJA ( 1 PC : 3 PS : Bahan : Semen (pc) 0.3 Pasir 0.03

zak @ Rp. . = Rp. 22000 m3 @ Rp. . = Rp. 50000 . = Rp.

157.12 59.85 216.97

m2 @ Rp. . = Rp. 10964.1 Total . = Rp.

10964.1 11181.08

AN PLESTERAN TYPE B zak @ Rp. . = Rp. 22000 m3 @ Rp. . = Rp. 50000

251.39 95.77

. = Rp. 347.16 m2 @ Rp. . = Rp. 10964.1 Total . = Rp.

10964.1 11311.26

ERJA ( 1PC : 4 PS) TEBAL 30 MM zak @ Rp. . = Rp. 22000 m3 @ Rp. . = Rp. 50000 . = Rp.

7510.84 2289.02 9799.86

m2 @ Rp.

4,385.64 . = Rp. 4385.64

Total

. = Rp. 14185.5

ERJA ( 1 PC : 3 PS : 5 KR) TEBAL 50 MM zak @ Rp. . = Rp. 22000 m3 @ Rp. . = Rp. 50000

6702.65 1462.4

Krikil 0.03

Upah : 1

E

PEKERJAAN PENUTUP LANTAI DAN DINDING

1. 1M2 PEKERJAAN PASANGAN KERAMIK LANTAI 3 Bahan : Keramik Lantai 1.1 Semen (pc) 0.17 Pasir 0.02 Semen Grouting 0.18

Upah : 1

2. 1M2 PEKERJAAN PASANGAN KERAMIK KM/ WC Bahan : Keramik Serit 1.1 Semen (pc) 0.17 Pasir 0.02 Semen Grouting 0.18

Upah : 1

m3 @ Rp. . = Rp. 50000 . = Rp.

1327.76 9492.8

m2 @ Rp.

7,601.78 . = Rp. 7601.78

Total

. = Rp. 17094.58

I DAN DINDING

N KERAMIK LANTAI 30/30

m2 @ Rp. 30000 zak @ Rp. 22000 m3 @ Rp. 50000 m3 @ Rp.

. = Rp. 33000 . = Rp. 3805.49 . = Rp. 1030.06 7,500.00 . = Rp. 1375 . = Rp. 39210.55

m2 @ Rp. . = Rp. 12293.08 Total . = Rp.

12293.08 51503.63

N KERAMIK KM/ WC 20X20 CM m2 @ Rp. . = Rp. 35000 zak @ Rp. . = Rp. 22000 m3 @ Rp. . = Rp. 50000 m3 @ Rp. 7,500.00 . = Rp.

38500 3805.49 1030.06 1375

. = Rp. 44710.55 m2 @ Rp. . = Rp. 12293.08 Total . = Rp.

12293.08 57003.63

3. 1M2 PEKERJAAN PASANGAN KERAMIK DINDING Bahan : Keramik Dinding 1.1 Semen (pc) 0.13 Pasir 0.02 Semen Grouting 0.18

Upah : 1

4. 1M' PEKERJAAN PASANGAN KERAMIK PLINT T = 12 CM Bahan : Keramik Dinding 0.17 Semen (pc) 0.02 Pasir 0 Semen Grouting 0.02

Upah : 1

5. 1 BH PEKERJAAN PASANGAN KERAMIK ASSESO Bahan : Keramik Assesories 1.1 Semen (pc) 0 Pasir 0

N KERAMIK DINDING ASIA 20X25 m2 @ Rp. 33000 zak @ Rp. 22000 m3 @ Rp. 50000 m3 @ Rp.

. = Rp. 36300 . = Rp. 2854.12 . = Rp. 772.54 7,500.00 . = Rp. 1375 . = Rp. 41301.66

m2 @ Rp. . = Rp. 39869.46 Total . = Rp.

39869.46 81171.13

KERAMIK

m2 @ Rp. 30000 zak @ Rp. 22000 m3 @ Rp. 50000 m3 @ Rp.

. = Rp. 5001 . = Rp. 342.49 . = Rp. 92.71 7,500.00 . = Rp. 165 . = Rp. 5601.2

m2 @ Rp.

9,037.08 . = Rp. 9037.08

Total . = Rp. 14638.28

N KERAMIK ASSESORIES (8 X 20) CM bh

@ Rp.

4,000.00 . = Rp. 4400

zak @ Rp. . = Rp. 22000 m3 @ Rp. . = Rp. 50000

45.67 12.36

Semen Grouting

Upah :

1M2 PEKERJAAN BATU ALAM PADA 6. DINDING Bahan : Batu Alam Semen (pc) Pasir

1.1200 0.1297

0.0155

Upah :

7.

1

1M2 PEKERJAAN BATU ALAM SUSUN SIRIH PAD Bahan : Batu Belah

275.0000

Semen (pc)

0.1297

Pasir

Upah : G

0.0155

1

PEKERJAAN RANGKA ATAP & PLAFOND

1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2 1. KRUING (Jarak Usuk 40; Jarak Reng 36 cm) Bahan :

m3 @ Rp.

7,500.00 . = Rp.

0

22 . = Rp. 4480.03 m2 @ Rp.

1,328.98 . = Rp.

1

1328.98 Total . = Rp. 5809.01

1.1200 0.1297

m2

@ Rp. 65,000.00 . = Rp.

72800

zak @ Rp. 22,000.00 . = Rp. m3

m2

2,854.12

@ Rp. 50,000.00 . = Rp.

772.54

. = Rp.

76426.66

@ Rp. 59,804.19 . = Rp.

59804.19

Total

. = Rp.

136230.86

M SUSUN SIRIH PADA PILAR

275.0000 0.1297

bh

@ Rp. 500.00 . = Rp.

137500

zak @ Rp. 22,000.00 . = Rp. m3

m2

@ Rp. 50,000.00 . = Rp.

BANGKIRAI RENG 2/3 KY.

772.54

. = Rp.

141126.66

@ Rp. 39,869.46 . = Rp.

39869.46

Total PLAFOND

2,854.12

. = Rp.

180996.13

Balok Kayu 0.0092 Reng Kayu 0.0045 Paku 0.2000

Upah :

1

1 M2 PEKERJAAN USUK 5/7 KY. BANGKIRAI RENG 2/3 KY. 2. KRUING (Jarak Usuk 45 cm; Jarak Reng 35 cm) Bahan : Balok Kayu 0.0092 Reng Kayu 0.0064 Paku 0.2000

Upah :

1

1 M3 PEKERJAAN GORDING, NOG, JURAI, MURPLATE. KAYU B 3. 8/12 Bahan : Balok Kayu 1.1000 Baut 50.0833

Upah :

bh @ Rp. 1,500.00

1

m3 @ Rp. 2,800,000.00

. = Rp.

25872

Kg @ Rp. 1,800,000.00

. = Rp.

8188.71

Kg @ Rp. 7,000.00

M2 @ Rp. 5,315.93 Total :

. = Rp.

1400

. = Rp.

35460.71

. = Rp.

5315.93

. = Rp.

40776.64

I RENG 2/3 KY.

m3 @ Rp. 2,800,000.00

. = Rp.

25872

Kg @ Rp. 1,800,000.00

. = Rp.

11583

Kg @ Rp. 7,000.00

M2 @ Rp. 5,315.93 Total :

. = Rp.

1400

. = Rp.

38855

. = Rp.

5315.93

. = Rp.

44170.93

MURPLATE. KAYU BANGKIRAI

m3 @ Rp. 2,800,000.00

. = Rp.

Rp. 1,500.00

m3 @ Rp. 571,462.31 Total :

3,080,000.00

. = Rp.

75125

. = Rp.

3,155,125.00

. = Rp.

571462.31

. = Rp.

3,726,587.31

1 M` PEKERJAAN PAPAN RUITER KAYU 4. BANGKIRAI 2/20 Bahan : Papan Kayu 0.0044 Paku 0.0200

Upah :

1

1 M` PEKERJAAN PAPAN LISJPLANK TUNGGAL KAY 5. BANGKIRAI 2/25 Bahan : Papan Kayu 0.0055 Paku 0.0200

Upah :

1

1 M` PEKERJAAN PAPAN LISJPLANK DOUBLE KAYU 6. 2/25 Bahan : Papan Kayu 0.0110 Paku 0.0400

Upah :

7.

1

1M' PEKERJAAN TALANG ZENG; PAPAN KAYU

m3 @ Rp. 3,000,000.00

. = Rp.

bh @ Rp.. =7,000.00 Rp.

140

. = Rp.

13340

m` @ Rp.. =1,993.47 Rp. Total :

13200

1993.47

. = Rp.

15333.47

ANK TUNGGAL KAYU

m3 @ Rp. 3,000,000.00

. = Rp.

bh @ Rp.. =7,000.00 Rp.

140

. = Rp.

16640

m` @ Rp.. =9,635.12 Rp. Total :

16500

9635.12

. = Rp.

26275.12

ANK DOUBLE KAYU BANGKIRAI 2/20;

m3 @ Rp. 3,000,000.00 bh @ Rp.. =7,000.00 Rp. . = Rp.

. = Rp.

33000 280 33280

m` @ Rp.. =19,270.24 Rp.

19270.24

Total :

52550.24

NG; PAPAN KAYU

. = Rp.

MERANTI Bahan : Seng BJLS 30 1.1000 Papan Kayu Meranti 0.0176

Paku Seng (Payung) 10.0000 b Paku 0.0200

Upah :

1 M' PEKERJAAN WENVIR 8. DENGAN SENG Bahan : Seng Papan Kayu Meranti Paku

Upah :

1 M2 PEKERJAAN RANGKA PLAFOND KY KRUING - P 9. GYPSUM Rangka = 60 x 60 CM Bahan : Gypsum 0.3819 Balok Kayu 0.0136 Paku 0.2000 Paku Plepet

30 1.1000 Meranti 0.0176

m' @ Rp. 24,000.00. = Rp.

26400

m3 @ Rp. 1,400,000.00

24640

Payung) 10.0000 buah @ Rp. 150.00

Paku 0.0200

. = Rp.

. = Rp.

1500

kg @ Rp. 7,000.00 . = Rp.

140

. = Rp.

52680

@ Rp. 10,299.61 . = Rp.

10299.61

1 m'

Total

1.1 m' 0 m3 0.02 kg

1 m'

. = Rp.

@ Rp. 8,000.00 . = Rp.

62979.61

8800

@ Rp. 1,400,000.00

. = Rp.

3640

@ Rp. 7,000.00 . = Rp.

140

. = Rp.

12580

@ Rp. 6,644.91 . = Rp.

6644.91

Total

. = Rp.

19224.91

FOND KY KRUING - PENUTUP

Gypsum 0.3819

Paku 0.2000

m3 @ Rp. 35,000.00. = Rp. m3 @ Rp. 1,800,000.00

. = Rp.

Kg @ Rp. 7,000.00 . = Rp. Kg . = Rp.

13368.06 24552 1400

Upah :

1 M2 PEKERJAAN RANGKA PLAFOND - PE 10. CALSIBOARD Rangka = 100 x 100 CM Bahan : Calsiboard 0.3819 Balok Kayu 0.0092 Paku 0.2000 Paku Plepet 0.0200

Upah :

11 1 M' PEKERJAAN LIS GYPSIUM LEBAR : 10 CM Bahan dan Upah : Lis Gypsium L=10 cm 1.0000 H 1.

PEKERJAAN PENUTUP ATAP

1 M2 PEKERJAAN PENUTUP ATAP GENTENG KERAMIK SO Bahan : Genteng Keramik

9.9000

0.02 @ Rp. 8,000.00

160 . = Rp.

39480.06

. = Rp.

17276.77

Total :

. = Rp.

56756.82

Calsiboard 0.3819

m3 @ Rp. 30,000.00

. = Rp.

11458.33

Balok Kayu 0.0092

m3 @ Rp. 1,800,000.00

Paku 0.2000

Kg @ Rp. 7,000.00

. = Rp.

1400

Paku Plepet 0.0200

Kg @ Rp. 8,000.00

. = Rp.

160

. = Rp.

29650.33

. = Rp.

9568.67

Total :

. = Rp.

39219

m3 m' Rp. 8,000.00

. = Rp.

8000

Total :

. = Rp.

8000

. = Rp.

20790

. = Rp.

20790

1 m2 @ Rp. 17,276.77

NGKA PLAFOND - PENUTUP

1 m2 @ Rp. 9,568.67

. = Rp.

16632

UM LEBAR : 10 CM

L=10 cm 1.0000

TENG KERAMIK SOKKA TYPE MORANDO SE

ramik

9.9000

bh @ Rp.

2,100.00

Upah :

1

1 M' PEKERJAAN KERPUS GENTENG KERAMIK 2. SOKKA Bahan : Genteng Kerpus Semen Pasir

3.3000

0.2601 0.0366

Upah :

F

1

PEKERJAAN KUSEN DAN DAUN PINTU JENDELA

1 1 M3 PEKERJAAN KUSEN KAYU JATI KELAS POLITU Bahan : Balok Kayu Paku

1.1000

5.0000

Upah : 2.

1

1 M' PEKERJAAN KUSEN KAYU JATI KELAS POLITUR 6/12 Bahan : Balok Kayu Paku Upah :

0.0087

0.0360 1

m2 @ Rp.

9,369.32

Total :

. = Rp.

9369.32

. = Rp.

30159.32

ENG KERAMIK

m3 @ Rp.

4,000.00

. = Rp.

13200

m3 @ Rp.

22,000.00

. = Rp.

5722.54

Kg @ Rp.

50,000.00

. = Rp.

1831.21

. = Rp.

20753.76

. = Rp.

22642.53

. = Rp.

43396.29

m2 @ Rp.

22,642.53

Total :

PINTU JENDELA

JATI KELAS POLITUR 6/12

m3 @

Rp.

Kg @

Rp.

m3 @

Rp.

6,000,000.00 7,000.00 2,299,139.05 Total :

. = Rp.

6,600,000.00

. = Rp. . = Rp.

35,000.00 6,635,000.00

. = Rp. . = Rp.

2,299,139.05 8,934,139.05

. = Rp.

52,272.00

ELAS POLITUR 6/12

m3 @

Rp.

6,000,000.00

Kg @

Rp.

7,000.00

. = Rp. . = Rp.

252.00 52,524.00

m' @

Rp.

16,553.80

. = Rp. . = Rp.

16,553.80 69,077.80

Total :

6,600,000.00 35,000.00 6,635,000.00 2,299,139.05 8,934,139.05

52,272.00 252.00 52,524.00 16,553.80 69,077.80

1 M3 PEKERJAAN KREPYAK KAYU JATI UNTUK 3. KUSEN Bahan : Papan Kayu Paku

1.1000

5.0000

Upah :

1

1 BH DAUN PINTU PANIL 3,5 X 82 X 200 4. CM Bahan : Papan Kayu Lem

0.0631

0.1500

Upah :

1

1 BH DAUN PINTU PANIL 3 X 74 X 5. 200 CM Bahan : Papan Kayu Lem

0.0488

0.1500

Upah :

1

1 BH DAUN PINTU PANIL 3 X 61 X 6. 200 CM Bahan : Papan Kayu Lem

0.1500

0.0403

m3 @

Rp.

Kg @

Rp.

m3 @

Rp.

8,000,000.00 7,000.00 2,152,951.02 Total :

8,000,000.00

. = Rp.

8,800,000.00

. = Rp. . = Rp.

35,000.00 8,835,000.00

. = Rp. . = Rp.

2,152,951.02 10,987,951.02

. = Rp.

504,800.00

m3 @

Rp.

Kg @

Rp.

8,000.00

. = Rp. . = Rp.

1,200.00 506,000.00

bh @

Rp.

245,516.15

. = Rp. . = Rp.

245,516.15 751,516.15

. = Rp.

390,400.00

Total :

m3 @

Rp.

8,000,000.00

Kg @

Rp.

8,000.00

. = Rp. . = Rp.

1,200.00 391,600.00

bh @

Rp.

237,914.38

. = Rp. . = Rp.

237,914.38 629,514.38

. = Rp.

322,400.00

. = Rp.

1,200.00

Total :

m3 @

Rp.

Kg @

Rp.

8,000,000.00 8,000.00

Upah :

1

7 1 BH DAUN JENDELA 52 X 150 CM; KAYU JATI POLITUR Bahan : Ram Kayu 3,5 cm

0.0156

Kaca Bening 5 mm

Upah :

8.

0.4725

1

1 BH DAUN JENDELA 62 X 116 CM; KAYU JATI POLITUR Bahan : Ram Kayu 3,5 cm

0.0137

Kaca Bening 5 mm

Upah :

9.

0.4500

1

1 BH DAUN JENDELA 62 X 166 CM; KAYU JATI POLITUR Bahan : Ram Kayu 3,5 cm

0.0176

Kaca Bening 5 mm

Upah :

10.

0.6750

1

1 BH ROSTER KAYU 30 X 40 CM

bh @

Rp.

233,395.84 Total :

. = Rp.

323,600.00

. = Rp. . = Rp.

233,395.84 556,995.84

m3

@

Rp.

8,000,000.00

m2

@

Rp.

60,000.00

bh

@

Rp.

93,028.75

Total :

m3

@

Rp.

8,000,000.00

m2

@

Rp.

60,000.00

bh

@

Rp.

93,028.75

Total :

m3

@

Rp.

8,000,000.00

m2

@

Rp.

60,000.00

bh

@

Rp.

93,028.75

Total :

323,600.00 233,395.84 556,995.84

.= Rp. .= Rp. .= Rp. .= Rp. .= Rp.

.= Rp. .= Rp. .= Rp. .= Rp. .= Rp.

.= Rp. .= Rp. .= Rp. .= Rp. .= Rp.

124,800.00 28,350.00 153,150.00 93,028.75 246,178.75

109,600.00 27,000.00

136,600.00 93,028.75 229,628.75

140,800.00 40,500.00 181,300.00 93,028.75 274,328.75

Bahan : Roster Kayu

1.0000

Upah :

11.

1

bh

@

bh

@

m2

@

1 M2 PEKERJAAN KACA ES UNTUK BOVEN Bahan dan Upah : Kaca Es 5mm Lis Kayu

J 1.

1.0000

4.0000

m'

@

Kg

@

Rp. 33,000.00

PEKERJAAN CAT DAN POLITUR 1 M2 PENGECATAN KAYU BARU Bahan : Cat Kayu Plamur Kayu

0.1375

Kg

@

Rp. 9,700.00

Dempul Jadi

0.5000

bh

@

Rp. 1,000.00

ltr

@

Rp. 4,500.00

lbr

@

Rp. 1,250.00

bh

@

Rp. 17,223.61

kg

@

Rp. 6,000.00

m2

@

Rp.

Thiner Amplas Upah : 2.

0.2750

0.2500 1.0000 1

1M2 PEKERJAAN MENI BIDANG KAYU BARU Bahan : Menie Jadi Upah :

0.28 1

Rp.

Rp.

45,000.00

1,328.98

Total :

Rp.

70,000.00

Rp.

3,000.00

Total :

@

Rp. 33,000.00

. = Rp.

9,075.00

@

Rp. 9,700.00

. = Rp.

1,333.75

@

Rp. 1,000.00

. = Rp.

500.00

@

Rp. 4,500.00

. = Rp.

1,125.00

@

Rp. 1,250.00

. = Rp. . = Rp.

1,250.00 13,283.75

@

Rp. 17,223.61 Total :

. = Rp. . = Rp.

17,223.61 30,507.36

@

Rp. 6,000.00

@

Rp.

. = Rp. . = Rp. . = Rp.

1,650.00 1,650.00 4,239.45

.= Rp. .= Rp. .= Rp. .= Rp.

.= Rp. .= Rp. .= Rp.

45,000.00 45,000.00 1,328.98 46,328.98

70,000.00 12,000.00 82,000.00

45,000.00 45,000.00 1,328.98 46,328.98

70,000.00 12,000.00 82,000.00

4239.45 1M2 PEKERJAAN PENGECATAN KAYU 3. BARU Bahan dan Upah: Cat-catan Menie

1 m2

@

Rp. 30,507.36

1 m2

@

Rp. 5,889.45

4. 1M2 PEKERJAAN PENGECATAN TEMBOK DGN CAT CATYLAC (Untuk Dinding dan Plafon) Bahan :

5.

Cat Tembok Catylac

0.18 kg

@

Rp. 10,000.00

Plamur Jadi

0.05 kg

@

Rp. 5,800.00

Amplas

0.25 lbr

@

Rp. 1,250.00

Upah :

1 m2

@

Rp. 6,441.41

1M2 PEKERJAAN POLITUR UNTUK KUSEN DAN DAUN PINTU DAN JENDELA Bahan : Sirlak

0.03 kg

@

Rp. 60,000.00

Spirtus

0.55 kg

@

Rp. 6,000.00

0.37 kg

@

Rp. 4,000.00

@

Rp. 24,669.23

Batu Apung Upah :

1 m2

D

PEKERJAAN BETON BERTULANG

1.

1M3 PEKERJAAN COR BETON UNTUK SLOOF, SKELET DAN RING BALOK; DGN M Bahan : Semen (pc) 8.5150

zak

Rp.

Total

. = Rp.

5,889.45

@

Rp. 30,507.36

. = Rp.

30,507.36

@

Rp. 5,889.45

. = Rp. . = Rp.

5,889.45 36,396.81

Total

@

Rp. 10,000.00

. = Rp.

1,830.00

@

Rp. 5,800.00

. = Rp.

266.80

@

Rp. 1,250.00

. = Rp. . = Rp.

312.50 2,409.30

@

Rp. 6,441.41

. = Rp. . = Rp.

6,441.41 8,850.71

Total DAN JENDELA

@

Rp. 60,000.00

. = Rp.

1,650.00

@

Rp. 6,000.00

. = Rp.

3,300.00

@

Rp. 4,000.00

. = Rp. . = Rp.

1,466.80 6,416.80

@

Rp. 24,669.23

. = Rp. . = Rp.

24,669.23 31,086.03

Total

RING BALOK; DGN MOLEN . = Rp.

187,329.70

@ Pasir Beton

0.5450 Kerikil Upah :

0.8174

m3

@

Rp. 50,000.00

m3

@

Rp. 50,000.00

1 m3

@

Rp. 62,794.40

1.1 kg

@

Rp. 4,500.00

0.02 kg

@

Rp. 8,000.00

@

Rp. 569.97

2. 1Kg. PEMBESIAN U-24 (Alat Gunting) Bahan : Besi Beton Bendrat (kawat beton) Upah :

1 m3

3. 1M2 PEKERJAAN BEKESTING UNTUK SKELET, SLOOF DAN RING BALOK DENGAN PAPAN SENGON Bahan : Papan sengon Paku Upah :

2.75 lbr

@

Rp. 3,000.00

0.2 kg

@

Rp. 7,000.00

@

Rp. 2,325.72

1 m2

4. 1 LS PERANCAH BETON DARI BAMBU UNTUK 1M3 PLAT TEBAL 12 CM Rangka (0,6 x 0,6) m. Bahan : Balok Kayu/ Bambu Paku Upah :

55 btg 1.66 kg 1 ls

@

Rp. 4,500.00

@

Rp. 7,000.00

@

Rp. 33,211.26

22000

@

Rp. 50,000.00

. = Rp.

27,247.96

@

Rp. 50,000.00

. = Rp. . = Rp.

40,871.93 255,449.59

@

Rp. 62,794.40

. = Rp. . = Rp.

62,794.40 318,244.00

Total

@

Rp. 4,500.00

. = Rp.

4,950.00

@

Rp. 8,000.00

. = Rp. . = Rp.

160.00 5,110.00

@

Rp. 569.97

. = Rp. . = Rp.

569.97 5,679.97

Total

RING BALOK

@

Rp. 3,000.00

. = Rp.

8,250.00

@

Rp. 7,000.00

. = Rp. . = Rp.

1,400.00 9,650.00

@

Rp. 2,325.72

. = Rp. . = Rp.

2,325.72 11,975.72

Total

AL 12 CM

@

Rp. 4,500.00

. = Rp.

247,500.00

@

Rp. 7,000.00

. = Rp. . = Rp.

11,620.00 259,120.00

@

Rp. 33,211.26

. = Rp.

33,211.26

1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SLOOF 5. 15/20 (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton Besi Beton U-24

1 m3 100 kg

Bekesting

5 m2

@

Rp. 318,244.00

@

Rp. 5,679.97

@

Rp. 11,975.72

6. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK SKELET 15/15 (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton Besi Beton U-24

1 m3 120 kg

Bekesting

5 m2

@

Rp. 318,244.00

@

Rp. 5,679.97

@

Rp. 11,975.72

7. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK BALOK RING 15/15 (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton Besi Beton U-24

1 m3 120 kg

Bekesting

5 m2

@

Rp. 318,244.00

@

Rp. 5,679.97

@

Rp. 11,975.72

8. 1 M3 PEKERJAAN STRUKTUR BETON BERTULANG UNTUK CANOPY (1pc : 2ps : 3 Kr) Bahan dan Upah : Beton Besi Beton U-24 Bekesting

1 m3 125 kg 5 m2

@

Rp. 318,244.00

@ Rp. 5,679.97 Rp.

Total

. = Rp.

292,331.26

@

Rp. 318,244.00

. = Rp.

318,244.00

@

Rp. 5,679.97

. = Rp.

567,996.72

@

Rp. 11,975.72 Total

. = Rp. . = Rp.

59,878.59 946,119.31

KELET 15/15

@

Rp. 318,244.00

. = Rp.

318,244.00

@

Rp. 5,679.97

. = Rp.

681,596.06

@

Rp. 11,975.72 Total

. = Rp. . = Rp.

59,878.59 1,059,718.65

ALOK RING 15/15

@

Rp. 318,244.00

. = Rp.

318,244.00

@

Rp. 5,679.97

. = Rp.

681,596.06

@

Rp. 11,975.72 Total

. = Rp. . = Rp.

59,878.59 1,059,718.65

@

Rp. 318,244.00

. = Rp.

318,244.00

@

Rp. 5,679.97

. = Rp. . = Rp.

709,995.90 59,878.59

@ Perancah Bambu M

0.5000 ls

@

Rp. 292,331.26

PEKERJAAN SANITASI DAN DRAINASI 1 M' PEKERJAAN INSTALASI AIR 1 BERSIH Bahan : Pipa PVC 3/4\"

0.28

btg

@

Rp.

14,000.

Sock

0.28

bh

@

Rp.

2,000.0

Knee

0.19

bh

@

Rp.

2,000.0

tube

@

Rp.

3,500.0

m'

@

Rp.

3,322.4

Lem PC

Upah :

0.2

1

1 M' PEKERJAAN INSTALASI AIR 2 KOTOR Bahan : Pipa PVC 3\"

0.28

btg

@

Rp.

85,000.

Sock

0.28

bh

@

Rp.

5,000.0

Knee

0.19

bh

@

Rp.

7,800.0

tube

@

Rp.

3,500.0

m'

@

Rp.

6,644.9

set

@

Rp.

1,000,000.

Lem PC Upah :

0.2 1

1 UNIT PEKERJAAN PASANG CLOSET 3 DUDUK Bahan : Closet Duduk

1

11975.72

@

Rp. 292,331.26 Total

. = Rp. . = Rp.

@

Rp.

14,000.00

. = Rp.

3,850.00

@

Rp.

2,000.00

. = Rp.

550.00

@

Rp.

2,000.00

. = Rp.

375.00

@

Rp.

3,500.00

. = Rp. . = Rp.

700.00 5,475.00

@

Rp.

3,322.46 Total

. = Rp. . = Rp.

3,322.46 8,797.46

@

Rp.

85,000.00

. = Rp.

23,375.00

@

Rp.

5,000.00

. = Rp.

1,375.00

@

Rp.

7,800.00

. = Rp.

1,462.50

@

Rp.

3,500.00

. = Rp. . = Rp.

700.00 26,912.50

@

Rp.

6,644.91 Total

. = Rp. . = Rp.

6,644.91 33,557.41

@

Rp.

. = Rp. . = Rp.

1,000,000.00 1,000,000.00

1,000,000.00

146,165.63 1,234,284.12

Upah :

1

unit

@

Rp.

96,484.

4 1 UNIT PEKERJAAN PASANG CLOSET JONGKOK Bahan : Closet Jongkok

1

bh

@

Rp.

74,500.

Dudukan closet

1

ls

@

Rp.

25,000.

1

unit

@

Rp.

48,242.

Upah :

5 1 UNIT PEKERJAAN PASANG WASHTAFEL Bahan : Washtafel

1

set

@

Rp.

200,000.

Upah :

1

unit

@

Rp.

96,484.

1 UNIT PEKERJAAN PASANG WALL 6 SHOWER Bahan : Wallshower

1

set

@

Rp.

50,000.

Upah :

1

unit

@

Rp.

21,125.

bh

@ Rp. 10,000.00

1 unit

@ Rp. 11,960.84 Total

7 1 BH PEKERJAAN PASANG FLOOR DRAIN Bahan : Floordrain 1.0000 Upah :

8 1 BH PEKERJAAN PASANG AVOR (KURASAN

@

Rp.

96,484.10 Total

. = Rp. . = Rp.

96,484.10 1,096,484.10

@

Rp.

74,500.00

. = Rp.

74,500.00

@

Rp.

25,000.00

. = Rp. . = Rp.

25,000.00 99,500.00

@

Rp.

48,242.05

. = Rp. . = Rp.

48,242.05 147,742.05

. = Rp. . = Rp.

200,000.00 200,000.00

. = Rp. . = Rp.

96,484.10 296,484.10

. = Rp. . = Rp.

50,000.00 50,000.00

. = Rp. . = Rp.

21,125.00 71,125.00

Total

@

Rp.

200,000.00

@

Rp.

96,484.10 Total

@

Rp.

50,000.00

@

Rp.

21,125.00 Total

@ Rp. 10,000.00

. = Rp. . = Rp.

10,000.00 10,000.00

@ Rp. 11,960.84

. = Rp. . = Rp.

11,960.84 21,960.84

BAK) Bahan : Avor 1.0000

bh

@ Rp. 5,000.00

1 unit

@ Rp. 11,960.84 Total

bh

@ Rp. 15,000.00

Knee 1.0000

bh

@ Rp. 2,500.00

Isolasi 1.0000

bh

@ Rp. 1,000.00

1 m'

@ Rp. 4,784.34 Total

Upah : 1 BH PEKERJAAN KERAN 9 AIR Bahan : Keran Air (rata-rata) 1.0000

Upah : 1 BH PEKERJAAN KERAN AIR UNTUK 10. DAPUR Bahan : Keran Air (rata-rata) 1.0000

bh

@ Rp. 25,000.00

Knee 1.0000

bh

@ Rp. 2,500.00

Isolasi 1.0000

bh

@ Rp. 1,000.00

1 m'

@ Rp. 4,784.34 Total

Upah :

1 BH PEKERJAAN PASANG SOAP HOLDER 11. TANAM Bahan : Soap Holder 1.0000

bh

@ Rp. 25,000.00

@ Rp. 5,000.00

. = Rp. . = Rp.

5,000.00 5,000.00

@ Rp. 11,960.84

. = Rp. . = Rp.

11,960.84 16,960.84

@ Rp. 15,000.00

. = Rp.

15,000.00

@ Rp. 2,500.00

. = Rp.

2,500.00

@ Rp. 1,000.00

. = Rp. . = Rp.

1,000.00 18,500.00

@ Rp. 4,784.34

. = Rp. . = Rp.

4,784.34 23,284.34

@ Rp. 25,000.00

. = Rp.

25,000.00

@ Rp. 2,500.00

. = Rp.

2,500.00

@ Rp. 1,000.00

. = Rp. . = Rp.

1,000.00 28,500.00

@ Rp. 4,784.34

. = Rp. . = Rp.

4,784.34 33,284.34

@ Rp. 25,000.00

. = Rp. . = Rp.

25,000.00 25,000.00

Upah :

1 bh

@ Rp. 20,100.85 Total

1 UNIT PEKERJAAN PASANG BATH 12. UP Bahan : Bath Up 1.0000 Upah :

set

@ Rp. 1,250,000.00

1 unit

@ Rp. 124,592.07 Total

unit

@ Rp. 200,000.00

1 UNIT PEKERJAAN BIKIN BAK 13. KONTROL Bahan : Bak Kontrol 1.0000 Upah :

1 ls

@ Rp. 73,125.00 Total

14. 1 UNIT PEKERJAAN SUMUR RESAPAN DENGAN BUIS BETON Bahan : Sumur Resapan 1.0000 Upah :

unit 1 ls

@ Rp. 750,000.00 @ Rp. 132,898.21 Total

15. 1 UNIT PEKERJAAN SEPTIC TANK Bahan : Septic tank 1.0000 Upah :

unit 1 ls

@ Rp. 1,500,000.00 @ Rp. 465,143.74 Total

@ Rp. 20,100.85

. = Rp. . = Rp.

@ Rp. 1,250,000.00

. = Rp. . = Rp.

1,250,000.00 1,250,000.00

@ Rp. 124,592.07

. = Rp. . = Rp.

124,592.07 1,374,592.07

@ Rp. 200,000.00

. = Rp. . = Rp.

200,000.00 200,000.00

@ Rp. 73,125.00

. = Rp. . = Rp.

73,125.00 273,125.00

@ Rp. 750,000.00

. = Rp. . = Rp.

750,000.00 750,000.00

@ Rp. 132,898.21

. = Rp. . = Rp.

132,898.21 882,898.21

@ Rp. 1,500,000.00

. = Rp. . = Rp.

@ Rp. 465,143.74

. = Rp.

465,143.74

. = Rp.

1,965,143.74

20,100.85 45,100.85

1,500,000.00 1,500,000.00

16. 1 UNIT PEKERJAAN INSTALASI SUMUR AIR BERSIH + POMPA Bahan + Upah Instalasi sumur air bersih + pompa 1.0000 unit

@ Rp. 1,000,000.00

. = Rp.

@ Rp. 1,000,000.00

. = Rp.

1 UNIT PEKERJAAN INSTALASI WATER 17. TORN Bahan + Upah Instalasi water torn 1.0000 unit M

PEKERJAAN PERKERASAN JALAN 1 1M2 PEKERJAAN PERKERASAN JALAN DENGAN PAVING BLOCK (Dengan 2 lapis pondasi) Bahan : Paving Blok1.1000 m2 @

Rp.

14,000.00

Pasir Beton0.1200 m3 @

Rp.

50,000.00

Sirtu

0.1200 m3 @

Rp.

30,000.00

Pasir urug 0.1350 m3 @

Rp.

27,000.00

Batu Belah 0.3000 m3 @

Rp.

35,000.00

Upah :

Rp.

14,253.33

1.0000 m2 @

1M' PEKERJAAN KANSTEN 2 (25x25x40) CM Bahan : Kansten

1.1000 m' @

Rp.

27,400.00

Pasir Beton0.0300 m3 @

Rp.

50,000.00

Sirtu

Rp.

30,000.00

0.0300 m3 @

00,000.00

00,000.00

. = Rp. Total

. = Rp. Total

. = Rp.

1,000,000.00 1,000,000.00

. = Rp.

1,000,000.00 1,000,000.00

ING BLOCK

Total

. = Rp.

15400

. = Rp.

6000

. = Rp.

3600

. = Rp.

3645

. = Rp.

10500

. = Rp.

39145

. = Rp.

14253.33

. = Rp.

53398.33

. = Rp.

30140

. = Rp.

1500

. = Rp.

900

O

Pasir urug 0.0297 m3 @

Rp.

27,000.00

Batu Belah 0.0660 m3 @

Rp.

35,000.00

Upah :

Rp.

4,560.07

1.0000 m2 @

PEKERJAAN PEMBERSIHAN AKHIR PROYEK 1 LS PEMBERSIHAN AKHIR 1 PROYEK Upah :

1 ls. @

Rp.

200,000.00

Analisa Harga satuan pekerjaan menggunakan metode Modern Yang Dikembangkan oleh dunia)

. = Rp.

801.9

. = Rp.

2310

. = Rp.

35651.9

. = Rp.

4560.07

Total

. = Rp.

embangkan oleh

. = Rp.

40211.97

200000

Pelatihan Jasa Konstruksi Sensa Yogyakarta (metode modern merupakan standar yang berla

kan standar yang berlaku untuk seluruh

RENCANA ANGGARAN BIAYA (RAB) ­ TANPA OVER HEAD PROYEK : sample LOKASI : sample

SAT.

URAIAN PEKERJAAN

No.

A

B

C

PEKJ.

Pekerjaan Persiapan 1 Mobilisasi

ls.

2 Direksikit (2,5x2,5) m

m

3 Gudang (4x3) m 4 Pemagaran Proyek 5 Unizet & Bouwplank 6 Dokumentasi

m m' m' ls.

Pekerjaan Tanah dan Pasir 1 Galian Tanah u/ Pondasi

m

2 Urugan Tanah Kembali

m

3 Urugan Tanah untuk Leveling Lantai

m

4 Urugan Pasir Bawah Pondasi dan Lantai

m

Pekerjaan Pasangan & Plesteran 1 Pasangan Batu Kali Pecah (1 pc. : 6 ps.)

m

2 Pasangan Batu Kali kosong

m

3 Pasangan Bata 1/2 Batu Tasram (1 pc. : 3 ps.)

m

4 Pasangan Bata 1/2 Batu (1 pc. : 5 ps.) 5 Rolaag Bata (1 pc. : 3 ps.)

m m'

6 Plesteran Dinding (1pc : 5ps) t = 20 mm

m

7 Plesteran Trasram (1pc : 3ps) t = 20 mm

m

8 Plesteran Trasram (1pc : 3ps) t = 6 mm 9 Sponengan sudut ( 1pc. : 2 ps.)

m m'

Harga Satuan Pekerjaan Bahan

VOLUME

(Rp)

JUMLAH

Upah

Bahan

(Rp)

1

(Rp)

Upah

TOTAL

BOBOT

( Rp)

(%)

(Rp)

200000

-

200000

0.19

625,000

.5951

1,200,000.00 130,000 1,378,390.00 122,400 489,192 150,000

1.1426 1.3125 .4658 .1428

4,042,582.00

3.8493

200,000.00

2 6.25

100,000

625,000

12 26 40.8 1

100,000 48,015 8,990 150,000

1,200,000.00 5,000 1,248,390.00 3,000 366,792 150,000

-

2

3 52.4711

8,500

-

446,004.35

446,004.35

.4247

27.5767

4,500

-

124,095.15

124,095.15

.1182

3 3 1.9256

27,000

6,500

51,991.2

12,516.4

64,507.6

.0614

2.349

32,400

4,950

76,107.6

11,627.55

87,735.15 722,342.25

.0835 .6878

22.1193

140,408.26

832,238.66 3,937,971.18

3.7496

10.409

54,150

40.4513

30,285.16

196.3907 10

3

3 37,625 3,105,732.51

3 813,463.35

.7746

327,655.53 1,552,729.74

1.4785

25,034.77 8,110.51

7,312.5 4,916,595.49 1,436,106.99 6,352,702.49 3,937.5 81,105.07 39,375 120,480.07

6.0489 .1147

404.0258

4,339.48

9,130 1,753,261.90 3,688,755.55 5,442,017.45

5.1818

73.3026

5,732.05

9,130

420,173.92

669,252.74 1,089,426.66

1.0373

47.6 433.28

2,547.58 630.81

9,130 2,750

121,264.63 434,588 555,852.63 273,315.49 1,191,520.00 1,464,835.49

.5293 1.3948

24,000

563,647.35

249,816

2 8,100 1,225,074.21

2

2 2 2

10 Penebalan Plesteran type A

m'

11 Penebalan Plesteran type B

m' 2 m

12 Lantai Kerja untuk Lantai

SAT. No.

URAIAN PEKERJAAN

D

Pekerjaan Beton Bertulang ( 1pc. : 2ps. : 3kr.) 1 Beton Bertulang untuk Sloof 1 Beton Bertulang untuk Kolom Praktis (Skelet) 2 Beton Bertulang untuk Ring Balok 3 Beton Bertulang untuk Ring Balok Gunung-gunung 4 Beton Bertulang untuk Luifel/ Canopy

E

3 m 3 m 3 m 3 m 3 m

Pekerjaan Penutup Lantai dan Dinding 1 Keramik Lantai 30/ 30 Eks IKAD 2 Keramik Lantai Km/Wc Eks Asia 3 Keramik Dinding Dapur dan Km/Wc Eks Asia 3 Keramik Plint t = 12 cm 4 Batu Belah Susun Sirih untuk pilar teras 5 Batu Alam penutup dinding 6 Keramik Assesoris Km/Wc

F

PEKJ.

2 m 2 m 2 m m' 2 m 2 m pcs.

Pekerjaan Kusen & Daun Pintu Jendela 1 Pekj. Kusen Pintu & Jendela kayu Jati 2 Pekj. Krepyak untuk Jendela kayu Jati 3 Daun Pintu Type P1 (3x61x200) cm 4 Daun Pintu Type P2 (3,5x82x200)cm 5 Daun Pintu Type P3 (KM/WC) (3x74x200)cm 6 Daun Jendela J1 (52x150) cm 7 Daun Jendela J2 (62x116) cm

3 m 3 m bh. bh. bh. bh. bh.

31.5

216.97

8250

6834.68

259875

266709.68

0.25

10.6

347.16

8250

3679.88

87450

91129.88

0.09

74.5

9,492.8

5,720

707,213.9

Harga Satuan Pekerjaan Bahan

VOLUME

(Rp)

Upah

JUMLAH Bahan

(Rp)

426,140 1,133,353.90 22,820,672.53

(Rp)

Upah

1.0792 21.7293

TOTAL

BOBOT

( Rp)

(%)

(Rp)

2.283

814,699.59

98,887.5 1,859,959.17

225,760.16 2,085,719.33

1.986

1.9125

916,899.59

107,465 1,753,570.47

205,526.81 1,959,097.28

1.8654

1.494

916,899.59

107,465 1,369,847.99

160,552.71 1,530,400.70

1.4572

1.7387

916,899.59

107,465 1,594,213.32

186,849.4 1,781,062.71

1.6959

.4992 1,072,009.59

122,104.38

535,147.19

68.5

39,210.55

9,250 2,685,922.62

6

44,710.55

9,250

31.808 39.7

41,301.66 5,601.2

16

141,126.66

12.5565 56

76,426.66 4,480.03

596,101.69 7,952,381.72

.5676 7.5721

633,625 3,319,547.62

3.1608

60,954.5

323,763.29

.3083

30,000 1,313,723.26 6,800 222,367.62

954,240 2,267,963.26 269,960 492,327.62

2.1595 .4688

30,000 2,258,026.59

480,000 2,738,026.59

2.6071

565,042.5 1,524,693.88 56,000 306,881.49 10,973,203.75

1.4518 .2922 10.4484

45,000 1,000

268,263.29

959,651.38 250,881.49

55,500

.7013 6,635,000.00 1,730,000.00 4,653,125.50 .0498 8,835,000.00 1,620,000.00 439,983.00 2 323,600 175,620 647,200 5 506,000 184,740 2,530,000.00 2 391,600 179,020 783,200 2 153,150 70,000 306,300

1,213,249.00 5,866,374.50

5.5858

80,676 520,659 351,240 998,440 923,700 3,453,700.00 358,040 1,141,240.00 140,000 446,300

.4958 .9507 3.2885 1.0867 .425

8 Daun Jendela PJ2 (62x166) cm

SAT. No.

URAIAN PEKERJAAN

G

Pekerjaan Kayu, Rangka Atap & Rangka Plafon

PEKJ.

3 1 Nog, Gording, Murplate dengan kayu Bangkirai.

m 2

m 2 Pekj. Usuk: 5/7, Reng: 3/5 dengan Kayu Bangkirai & Kruing m' 3 Pekj. Lisjplank Kayu Bangkirai 2/25 m' 4 Pekj. Ruiter dengan Kayu Bangkirai 2/20 5 Pekj. Papan Wenvir 2/12

m' 2

6 Pekj. Plafon (60 x 60) Cm dgn Kayu 4/6 & 5/7 Ky Merantim 2 m 7 Pekj. Plafon (100 x 100) Cm dgn Kayu 4/6 & 5/7 Ky Meranti m' 8 Pekerjaan Talang *) Semua Rangka Atap: Gording, Nog,Usuk & Reng dll. dianti Rayap

H

Pekerjaan Penutup Atap & Lis Plafond 2

I

1 Pekj. Atap Genteng Sokka Morando SE Glazur 2 Kerpus Genteng Sokka Morando SE Glazur

m m'

5 Lis sudut - Gypsum

m'

Pekerjaan Kaca & Rilling Kayu 2 1 Kaca Es untuk Boven tebal 5 mm.

J

m

Pekerjaan Cat & Melamin 2 1 Cat Tembok untuk Dinding Merk Catylac

m

2 Cat Tembok untuk Plafond Merk Catylac

m

2 2 2 Cat Kayu untuk lisjplank Standart EMCO

m

3 Politur untuk Kusen Pintu Jendela & BV

m

4 Politur untuk Daun Pintu dan Jendela

m

2 2

bh.

7

136600

70000

956200

490000 1,446,200.00

1.38

2

181300

70000

362600

140000

0.48

502600 14,375,513.50

VOLUME

Harga Satuan Pekerjaan

JUMLAH

Bahan (Rp)

Bahan (Rp)

Upah (Rp)

1.0952 3,155,125.00

Upah (Rp)

13.69

TOTAL

BOBOT

( Rp)

(%)

430,000 3,455,492.90

470,936 3,926,428.90

3.7387

4,000 4,861,362.51 7,250 575,802.24 1,500 377,920.87

548,366 5,409,728.51 250,875.38 826,677.62 42,494.85 420,415.72

5.151 .7871 .4003

137.0915 34.6035 28.3299

35,460.71 16,640 13,340

12.3035

12,580

68.5

39,480.06

13,000 2,704,383.81

37.9052 22.5165

29,650.33 53,940

7,200 1,123,901.82 7,750 1,214,540.01

5,000

154,778.03

216,295.53

.206

890,500 3,594,883.81

3.423

61,517.5

272,917.44 1,396,819.26 174,502.88 1,389,042.89 17,180,292.22

1.33 1.3226 16.3587

137.0915 28.3299

20,790 20,753.76

7,050 2,850,132.29 17,037.5 587,951.87

72

8,000

576,000

966,495.08 3,816,627.36 482,670.67 1,070,622.54

3.6341 1.0194

-

576,000

.5485

5,463,249.90

5.202

-

63,960 63,960

.0609 .0609

3.4761

.78

82,000

63,960

503.1195

2,409.3

4,846.88 1,212,165.81 2,438,557.33 3,650,723.14

106.4052

2,409.3

4,846.88

256,362.05

515,732.7

772,094.75

.7352

8.6509

14,933.75

16,150

129,190.38

139,712.04

268,902.41

.256

27.7159

6,416.8

18,562.5

177,847.39

514,476.39

692,323.78

.6592

K

Pekerjaan Instalasi Listrik 1 Stop kontak

titik

2 Piting Lampu & Sakelar 3 Penangkal Petir (1speed 2 Arde)

titik unit.

SAT. No.

URAIAN PEKERJAAN

L

Pekerjaan Penggantung & Pengunci

M

PEKJ.

1 Slot & Handel Pintu ex. SES 2 Slot Pintu Kupu Tarung ex. SES

bh. bh.

3 Slot Pintu Km/Wc 4 Handle Pintu Kupu Tarung

bh. ps.

5 Engsel Pintu

ps.

6 Engsel Jendela 7 Grendel Jalu untuk Jendela

ps. bh.

8 Grendel Pintu 9 Hag Angin ( Win Hag )

bh. bh.

Pekerjaan Drainasi & Sanitasi 1 Closet Duduk 'Monoblok' ex. Toto 2 Closest Jongkok

unit bh.

3 Wall Shower 4 Wastafel ( Komplit ) ex. INA

unit unit

5 Floor Drain 6 Avor (Kurasan Bak)

bh. bh.

7 Kran Air

bh.

37.41

6416.8

18562.5

240048.64

694411.99

934460.63

0.89

6,318,504.71

6.02

5

75000

375000

-

375000

0.36

16 1

75000 125000

1,200,000.00 125000

-

1,200,000.00 125000

1.14 0.12

1,700,000.00

1.62

Harga Satuan Pekerjaan Bahan

VOLUME

JUMLAH

Upah

(Rp)

Bahan

(Rp)

Upah

(Rp)

TOTAL

BOBOT

( Rp)

(%)

(Rp)

6 1

125000 90000

750000 90000

-

750000 90000

0.71 0.09

2 2

20000 50000

40000 100000

-

40000 100000

0.04 0.1

9

16900

152100

-

152100

0.14

11 22

5000 3000

55000 66000

-

55000 66000

0.05 0.06

16 22

3200 10900

51200 239800

-

51200 239800

0.05 0.23

1,544,100.00

1.47

1 1,000,000.00 1 99500

72600 1,000,000.00 36300 99500

72600 36300

1,072,600.00 135800

1.02 0.13

1 1

50000 200000

15125 72600

50000 200000

15125 72600

65125 272600

0.06 0.26

2 1

10000 5000

9000 9000

20000 5000

18000 9000

38000 14000

0.04 0.01

5

18500

3600

92500

18000

110500

0.11

bh.

8 Kran Air untuk Dapur 9 Soap Holder Tanam 10 Bath Up (Komplit) ex INA

bh. bh.

11 Instalasi Sumur Air Bersih + Pompa 12 Instalasi & Water Torn Stainleesteel

bh. bh.

13 Pemipaan Air bersih

m'

14 Pemipaan Air kotor 15 Pemipaan Air bekas

m' m'

16 Bak Kontrol 17 Bak Lemak

unit unit

18 Sumur Resapan 19 Septictank

unit unit

SAT. No.

URAIAN PEKERJAAN

N

Pekerjaan Perkerasan Jalan

PEKJ.

2 m m'

1 Perkerasan Jalan dengan Conblock 2 Pekj. Kansten 25x25x40

O

Pekerjaan Pembersihan Lokasi ls

1 Pembersihan Lokasi Akhir Proyek

TOTAL

1

28500

3600

28500

3600

32100

0.03

2 25000 1 1,250,000.00

15125 50000 93750 1,250,000.00

30250 80250 93750 1,343,750.00

0.08 1.28

1 1,000,000.00 1 1,000,000.00

1,000,000.00 1,000,000.00

1,000,000.00 1,000,000.00

0.95 0.95

18.2

5218.75

2500

94981.25

45500

140481.25

0.13

20.2 14.7

26912.5 26912.5

5000 5000

543632.5 395613.75

101000 73500

644632.5 469113.75

0.61 0.45

1 1

200000 200000

52000 52000

200000 200000

52000 52000

252000 252000

0.24 0.24

200000 1,700,000.00 350000 1,850,000.00

1.62 1.76

100000 1,500,000.00 350000 1,500,000.00

2 750000 1 1,500,000.00

10,472,952.50

Harga Satuan Pekerjaan Bahan

VOLUME

(Rp)

20 5

1

JUMLAH

Upah (Rp)

39,145 35,651.9

Bahan (Rp)

10,725 3,431.25

200,000

Upah

9.97

TOTAL

BOBOT

( Rp)

(%)

(Rp)

782,900 178,259.5

214,500 17,156.25

-

200,000.00

997,400 195,415.75

.9497 .1861

1,192,815.75

1.1358

200,000 200,000

.1904 .1904

76,643,190.3228,379,380.50105,022,570.81

100

REKAPITULASI RENCANA ANGGARAN BIAYA (SEMENTARA) PROYEK : sample LOKASI : sample NO

MACAM PEKERJAAN

BOBOT (%)

A Pekerjaan Persiapan 3.85

B Pekerjaan Tanah dan Pasir 0.69

C Pekerjaan Pasangan & Plesteran 21.73

D Pekerjaan Beton Bertulang ( 1pc. : 2ps. : 3kr.) 7.57

E Pekerjaan Penutup Lantai dan Dinding 10.45

F

Pekerjaan Kusen & Daun Pintu Jendela 13.69

G Pekerjaan Kayu, Rangka Atap & Rangka Plafon 16.36

H Pekerjaan Penutup Atap & Lis Plafond 5.2

I

Pekerjaan Kaca & Rilling Kayu 0.06

J

Pekerjaan Cat & Melamin 6.02

K Pekerjaan Instalasi Listrik 1.62

L

Pekerjaan Penggantung & Pengunci 1.47

M Pekerjaan Drainasi & Sanitasi 9.97

N

Pekerjaan Perkerasan Jalan 1.14

O Pekerjaan Pembersihan Lokasi 0.19 100

JUMLAH

TOTAL

(Rp) 4,042,582.00 722342.25 22,820,672.53 7,952,381.72 10,973,203.75 14,375,513.50 17,180,292.22 5,463,249.90 63960 6,318,504.71 1,700,000.00 1,544,100.00 10,472,952.50 1,192,815.75 200000 Jumlah Nominal Jasa Konstruksi Jumlah PPN Jumlah Dibulatkan

105,022,570.81 Rp 10.% Rp Rp 10.% Rp Rp Rp

105,022,570.81 10,502,257.08 115,524,827.90 11,552,482.79 127,077,310.68 ­

RENCANA ANGGARAN BIAYA (RAB) ­ DENGAN OVER HEAD PROYEK : sample LOKASI : sample

SAT 0 No.

URAIAN PEKERJAAN

PEK J.

A

B

C

Pekerjaan Persiapan 1 Mobilisasi

ls.

2 Direksikit (2,5 x 2,5) m

m

3 Gudang (4 x 3) m 4 Pemagaran Proyek 5 Unizet & Bouwplank

m m' m'

6 Dokumentasi

ls.

Pekerjaan Tanah dan Pasir 1 Galian Tanah u/ Pondasi

m

2 Urugan Tanah Kembali

m

3 Urugan Tanah untuk Leveling Lantai

m

4 Urugan Pasir Bawah Pondasi dan Lantai

m

Pekerjaan Pasangan & Plesteran 1 Pasangan Batu Kali Pecah (1 pc : 6 ps)

m

2 Pasangan Batu Kali kosong

m

3 Pasangan Bata 1/2 Batu Tasram (1 pc : 3 ps)

m

4 Pasangan Bata 1/2 Batu (1 pc : 5 ps) 5 Rolaag Bata (1 pc : 3 ps)

m m'

6 Plesteran Dinding (1pc : 5ps) t = 20 mm

m

7 Plesteran Trasram (1pc : 3ps) t = 20 mm

m

8 Plesteran Trasram (1pc : 3ps) t = 6 mm

m

R HEAD

Harga Satuan Pekerjaan VOLUM E

Bahan (Rp.)

JUMLAH

Upah

Bahan

(Rp.

1

(Rp.)

200000

-

TOTAL

BOBOT

Upah (Rp.) (Rp.)

(%)

200,000.00

200000

0.1751

625,000

0.5472

2 6.25

100,000

625,000

-

12 26 40.8

100,000 48,015 8,990

1,200,000.00 6,644.91 1,248,390.00 3,986.95 366,792

1,200,000.00 172,767.67 1,421,157.67 162,667.41 529,459.41

1.0507 1.2443 0.4636

1

150,000

150,000

150,000 4,125,617.08

0.1313 3.6122

2

3 52.4711

11,296.35

-

592,731.80

592,731.8

0.5190

27.5767

5,980.42

-

164,920.23

164,920.23

0.1444

3 3 1.9256

27,000

8,638.38

51,991.2

16,634.07

68,625.27

0.0601

2.349

32,400

6,578.46

76,107.6

15,452.81

91,560.41 917,837.71

0.0802 0.8036

22.1193

140,408.26

50,002.95 3,105,732.51 1,106,030.29 4,211,762.81

3.6877

10.409

54,150

31,895.57

895,648.34

0.7842

40.4513

30,285.16

435,448.34 1,660,522.55

1.4539

196.3907 10

25,034.77 8,110.51

9,718.18 4,916,595.49 1,908,560.50 6,825,155.99 5,232.87 81,105.07 52,328.67 133,433.74

5.9758 0.1168

404.0258

4,339.48

12,133.61 1,753,261.90 4,902,290.13 6,655,552.03

5.8273

73.3026

5,732.05

12,133.61

420,173.92

889,424.91 1,309,598.84

1.1466

47.6

2,547.58

12,133.61

121,264.63

577,559.68

0.6119

3

3 3 563,647.35

332,000.99

2 10,764.76 1,225,074.21

2

2 2 2 698,824.31

9 Sponengan sudut ( 1pc : 2 ps)

m'

10 Penebalan Plesteran type A 11 Penebalan Plesteran type B

m' m'

12 Lantai Kerja Rabat Beton untuk Lantai Keramik

m

SAT 0.0 No.

URAIAN PEKERJAAN

PEK J.

D

E

F

Pekerjaan Beton Bertulang ( 1pc : 2ps : 3kr) 1 Beton Bertulang untuk Sloof

m

1 Beton Bertulang untuk Kolom Praktis (Skelet)

m

2 Beton Bertulang untuk Ring Balok

m

3 Beton Bertulang untuk Ring Balok Gunung-gunung

m

4 Beton Bertulang untuk Luifel/Canopy

m

Pekerjaan Penutup Lantai dan Dinding 1 Keramik Lantai 30/ 30 Eks IKAD

m

2 Keramik Lantai Km/Wc Eks Asia

m

3 Keramik Dinding Dapur dan Km/Wc Eks Asia 3 Keramik Plint t = 12 cm

m m'

4 Batu Belah Susun Sirih untuk pilar teras

m

5 Batu Alam penutup dinding 6 Keramik Assesoris Km/Wc

m pcs.

Pekerjaan Kusen & Daun Pintu Jendela 1 Pekj. Kusen Pintu & Jendela kayu Jati

m

2 Pekj. Krepyak Jendela kayu Jati 3 Daun Pintu Type P1 (3x61x200) cm 4 Daun Pintu Type P2 (3,5x82x200)cm 5 Daun Pintu Type P3 (KM/WC) (3x74x200)cm

m bh. bh. bh.

433.28

630.81

3654.7

273315.49

31.5 10.6

216.97 347.16

10964.1 10964.1

6834.68 3679.88

74.5

9,492.8

7,601.78

707,213.9

1,583,508.76 1,856,824.25 345369.23 116219.49

1.6258 0.3084 0.1050

352203.91 119899.36

2

Harga Satuan Pekerjaan VOLUM E

Bahan (Rp)

Upah (Rp)

566,332.44 1,273,546.34 25,992,972.47

1.1151 22.7584

JUMLAH

Bahan (Rp)

TOTAL

BOBOT

( Rp)

(%)

Upah (Rp)

3 2.283

814,699.59

131,419.72 1,859,959.17

300,031.22 2,159,990.38

1.8912

1.9125

916,899.59

142,819.06 1,753,570.47

273,141.46 2,026,711.92

1.7745

1.494

916,899.59

142,819.06 1,369,847.99

213,371.68 1,583,219.67

1.3862

1.7387

916,899.59

142,819.06 1,594,213.32

248,319.5 1,842,532.82

1.6132

162,274.53

81,007.45

616,154.63 8,228,609.43

0.5395 7.2046

842,076.29 3,527,998.90

3.0890

3 3 3 3 .4992 1,072,009.59

535,147.19

2 68.5

39,210.55

12,293.08 2,685,922.62

6

44,710.55

12,293.08

31.808 39.7

41,301.66 5,601.2

16

141,126.66

12.5565 56

76,426.66 4,480.03

2 342,021.8

0.2995

39,869.46 1,313,723.26 9,037.08 222,367.62

1,268,167.89 2,581,891.15 358,772.01 581,139.63

2.2606 0.5088

39,869.46 2,258,026.59

637,911.41 2,895,938.00

2.5356

59,804.19 1,328.98

750,931.37 1,710,582.75 74,423 325,304.49 11,964,876.72

1.4977 0.2848 10.476 -

268,263.29

73,758.51

2

2 2 959,651.38 250,881.49

3 .7013 6,635,000.00 2,299,139.05 4,653,125.50

1,612,386.21 6,265,511.71

5.4858

.0498 8,835,000.00 2,152,951.02 439,983.00 2 323,600 233,395.84 647,200 5 506,000 245,516.15 2,530,000.00 2 391,600 237,914.38 783,200

107,216.96 547,199.96 466,791.68 1,113,991.68 1,227,580.77 3,757,580.77 475,828.75 1,259,028.75

0.4791 0.9754 3.2900 1.1024

3

6 Daun Jendela J1 (52x150) cm

bh.

2

7 Daun Jendela J2 (62x116) cm 8 Daun Jendela PJ2 (62x166) cm

bh. bh.

7 2

153150

93028.75

306300

136600 181300

93028.75 93028.75

956200 362600

492357.5

0.4311

651201.23 1,607,401.23 186057.5 548657.5

1.4074 0.4804

186057.5

15,591,729.10

13.65

SAT 0 No.

URAIAN PEKERJAAN

PEK J.

G

Pekerjaan Kayu, Rangka Atap & Rangka Plafon 3 m 1 Nog, Gording, Murplate dengan kayu Bangkirai. 2 m 2 Pekj. Usuk: 5/7, Reng: 3/5 dengan Kayu Bangkirai & Kruing m' 3 Pekj. Lisjplank Kayu Bangkirai 2/25 4 Pekj. Ruiter dengan Kayu Bangkirai 2/20 m' 5 Pekj. Papan Wenvir 2/12

m' 2

6 Pekj. Plafon Gypsium Rangka (60x60) Cmm Ky Meranti 2 7 Pekj. Plafon Calsiboard Rangka (100x100)m Cm Ky Meranti m' 8 Pekerjaan Talang *) Semua Rangka Atap: Gording, Nog,Usuk & Reng dll. dianti Rayap

H

Pekerjaan Penutup Atap & Lis Plafond 2 m 1 Pekj. Atap Genteng Sokka Morando SE Glazur m' 2 Kerpus Genteng Sokka Morando SE Glazur m' 3 Lis sudut - Gypsum

I

Pekerjaan Kaca & Rilling Kayu 2 1 Kaca Es untuk Boven tebal 5 mm.

J

m

Pekerjaan Cat & Melamin 2 1 Cat Tembok untuk Dinding Merk Catylac m 2 2 Cat Tembok untuk Plafond Merk Catylac m 2 3 Cat Kayu untuk lisjplank Standart EMCO m 2 4 Politur untuk Kusen Pintu Jendela & BV

m

5 Politur untuk Daun Pintu dan Jendela

m

2

K

Pekerjaan Instalasi Listrik

JUMLAH

Harga Satuan Pekerjaan VOLUM E

Bahan (Rp)

Upah (Rp)

1.0952 3,155,125.00 137.0915 34.6035 28.3299

35,460.71 16,640 13,340

12.3035

12,580

68.5 37.9052 22.5165

Bahan (Rp)

TOTAL

BOBOT

( Rp)

(%)

Upah (Rp)

571,462.31 3,455,492.90

625,865.52 4,081,358.42

3.5735

5,315.93 4,861,362.51 9,635.12 575,802.24 1,993.47 377,920.87

728,768.6 5,590,131.12 333,408.88 909,211.12 56,474.9 434,395.76

4.8945 0.7961 0.3803

236,533.69

0.2071

39,480.06

17,276.77 2,704,383.81 1,183,458.57 3,887,842.37

3.4040

29,650.33 52,680

9,568.67 1,123,901.82 10,299.61 1,186,169.22

1.3016 1.2416

6,644.91

154,778.03

81,755.66

362,702.39 1,486,604.21 231,911.2 1,418,080.42 18,044,157.11

137.0915 28.3299 72

20,790 20,753.76 8,000

15.7987

9,369.32 2,850,132.29 1,284,454.66 4,134,586.95 22,642.53 587,951.87 641,460.69 1,229,412.55 576,000 576,000

3.6201 1.0764 0.5043

5,939,999.50

5.2008

-

63,960 63,960

0.0560 0.0560

.78

82,000

63,960

503.1195

2,409.3

6,441.41 1,212,165.81 3,240,799.06 4,452,964.87

3.8988

106.4052

2,409.3

6,441.41

256,362.05

685,399.54

941,761.58

0.8246

8.6509

14,933.75

21,463.06

129,190.38

185,674.79

314,865.17

0.2757

27.7159

6,416.8

24,669.23

177,847.39

683,729.92

861,577.31

0.7544

37.4094

6,416.8

24,669.23

240,048.64

922,861.11 1,162,909.75 7,734,078.68

1.0182 6.7716

1 Stop kontak

titik

2 Piting Lampu & Sakelar 3 Penangkal Petir (1speed 2 Arde)

titik unit.

SAT 0 No.

URAIAN PEKERJAAN

PEK J.

L

M

Pekerjaan Penggantung & Pengunci 1 Slot & Handel Pintu ex. SES

bh.

2 Slot Pintu Kupu Tarung ex. SES 3 Slot Pintu Km/Wc

bh. bh.

4 Handle Pintu Kupu Tarung 5 Engsel Pintu

ps. ps.

6 Engsel Jendela 7 Grendel Jalu untuk Jendela

ps. bh.

8 Grendel Pintu

bh.

9 Hag Angin ( Win Hag )

bh.

Pekerjaan Drainasi & Sanitasi 1 Closet Duduk 'Monoblok' ex. Toto

unit

2 Closest Jongkok 3 Wall Shower

bh. unit

4 Wastafel (komplit) ex. INA 5 Floor Drain

unit bh.

6 Avor (kurasan bak) 7 Kran Air

bh. bh.

8 Kran Air untuk Dapur 9 Soap Holder Tanam

bh. bh.

5

75000

375000

16 1

75000 125000

1,200,000.00 125000

Harga Satuan Pekerjaan VOLUM E

Bahan

0.3283

1,200,000.00 125000

1.0507 0.1094

1,700,000.00

1.4885

JUMLAH

Upah

(Rp)

375000

-

(Rp)

Bahan (Rp)

TOTAL

BOBOT

Upah ( Rp) (Rp)

(%)

6

125000

750000

-

750000

0.6567

1 2

90000 20000

90000 40000

-

90000 40000

0.0788 0.0350

2 9

50000 16900

100000 152100

-

100000 152100

0.0876 0.1332

11 22

5000 3000

55000 66000

-

55000 66000

0.0482 0.0578

16

3200

51200

-

51200

0.0448

22

10900

239800

239800 1,544,100.00

0.2100 1.3520

1 1,000,000.00

96484.1 1,000,000.00

96484.1 1,096,484.10

0.9600

1 1

99500 50000

48242.05 21125

99500 50000

48242.05 21125

147742.05 71125

0.1294 0.0623

1 2

200000 10000

96484.1 11960.84

200000 20000

96484.1 23921.68

296484.1 43921.68

0.2596 0.0385

1 5

5000 18500

11960.84 4784.34

5000 92500

11960.84 23921.68

16960.84 116421.68

0.0149 0.1019

1

28500

4784.34

28500

4784.34

33284.34

0.0291 0.0790

10 Bath Up (komplit) ex INA

bh.

11 Instalasi Sumur Air Bersih 12 Instalasi & Water Torn Stainleesteel

bh. bh.

13 Pemipaan Air bersih 14 Pemipaan Air kotor

m' m'

15 Pemipaan Air bekas

m'

16 Bak Kontrol 17 Bak Lemak

unit unit

18 Sumur Resapan 19 Septictank

unit unit

SAT 0 No.

URAIAN PEKERJAAN

PEK J.

N

Pekerjaan Perkerasan Jalan 2 m m'

1 Perkerasan Jalan dengan Conblock 2 Pekj. Kansten 25x25x40

O

Pekerjaan Pembersihan Lokasi ls

1 Pembersihan Lokasi Akhir Proyek

TOTAL

2

25000

20100.85

50000

40201.71

90201.71

1 1,250,000.00

124592.07 1,250,000.00

124592.07 1,374,592.07

1.2035

1 1,000,000.00 1 1,000,000.00

1,000,000.00 1,000,000.00

1,000,000.00 1,000,000.00

0.8756 0.8756

18.2 20.2

5475 26912.5

3322.46 6644.91

99645 543632.5

60468.69 134227.19

160113.69 677859.69

0.1402 0.5935

14.7

26912.5

6644.91

395613.75

97680.18

493293.93

0.4319

1 1

200000 200000

73125 73125

200000 200000

73125 73125

273125 273125

0.2391 0.2391

265796.42 1,765,796.42 465143.74 1,965,143.74

1.5461 1.7206

132898.21 1,500,000.00 465143.74 1,500,000.00

2 750000 1 1,500,000.00

10,895,675.04

Harga Satuan Pekerjaan VOLUM E

Bahan (Rp)

20 5

1

JUMLAH

Upah (Rp)

39,145 35,651.9

9.5398

Bahan (Rp)

14,253.33 4,560.07

200,000

782,900 178,259.5

-

TOTAL

BOBOT

Upah ( Rp) (Rp)

(%)

285,066.66 1,067,966.66 22,800.35 201,059.85

0.9351 0.1760

1,269,026.51

1.1111

200,000 200,000

0.1751 0.1751

200,000.00

76,619,483.2837,593,156.09114,212,639.36 100.00

REKAPITULASI RENCANA ANGGARAN BIAYA (FINAL/REA PROYEK : sample LOKASI : sample NO

MACAM PEKERJAAN

A

Pekerjaan Persiapan

B

Pekerjaan Tanah dan Pasir

C D

Pekerjaan Pasangan & Plesteran Pekerjaan Beton Bertulang ( 1pc : 2ps : 3kr)

E

Pekerjaan Penutup Lantai dan Dinding

F G

Pekerjaan Kusen & Daun Pintu Jendela Pekerjaan Kayu, Rangka Atap & Rangka Plafon

H

Pekerjaan Penutup Atap & Lis Plafond

I J

Pekerjaan Kaca & Rilling Kayu Pekerjaan Cat & Melamin

K L

Pekerjaan Instalasi Listrik Pekerjaan Penggantung & Pengunci

M

Pekerjaan Drainasi & Sanitasi

N O

Pekerjaan Perkerasan Jalan Pekerjaan Pembersihan Lokasi

A (FINAL/REAL)

BOBOT

JUMLAH TOTAL

(%)

(Rp) 3.61

4,125,617.08

0.8

917,837.71

22.76 25,992,972.47 7.2

8,228,609.43

10.48 11,964,876.72 13.65 15,591,729.10 15.8 18,044,157.11 5.2

5,939,999.50

0.06 6.77

63,960.00 7,734,078.68

1.49 1.35

1,700,000.00 1,544,100.00

9.54 10,895,675.04 1.11 0.18

1,269,026.51 200,000.00

100

114,212,639.36

Jumlah Nominal Jasa Konstruksi 10.%

Rp Rp

114,212,639.36 11,421,263.94

Jumlah PPN

Rp Rp

125,633,903.30 12,563,390.33

Rp Rp

138,197,293.63 138,190,000.00

Jumlah Dibulatkan

10.%

14,212,639.36 11,421,263.94

25,633,903.30 12,563,390.33

38,197,293.63 38,190,000.00

Copyright @2008 http://kontraktorrumah.blogspot.com e-mail :

contact: [email protected]

mobile : 6281804298940,622747848678

Related Documents

Sample Hitungan Rab
November 2019 4
Rab
June 2020 33
Geopro Hitungan
May 2020 14
Hitungan Cawan.docx
November 2019 20
Hitungan Jembatan.xlsx
November 2019 18
Hitungan Ratio
November 2019 14