TUGAS HIDROLOGI TERAPAN Aplikasi Data Curah Hujan Untuk Perhitungan Debit Banjir dan Debit Saluran Samping 1. Data Diketahui : Data Curah Hujan harian maximum tahunan pada stasiun curah hujan sebagai berikut : No.

Tahun

Stasiun A (mm)

Stasiun B (mm)

Stasiun C (mm)

1 2 3 4 5 6 7 8 9 10 11 12

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

97 86 88 78 105 110 98 97 75 63 71 97

99 87 87 75 101 115 97 95 76 67 72 95

101 89 83 71 109 117 93 92 78 65 77 93

Gunakan data curah hujan tersebut untuk menghitung Debit banjir sungai dengan data sebagai berikut : a) Debit Banjir Sungai A dengan data - data Sebagai Berikut : * A = 15 km2 L= 5 km * Perbedaan tinggi pada hulu dan lokasi pengukuran = 20 m * Lebar sungai pada lokasi pengukuran bagian dasarnya = 50 m dan antara puncak Tebing = 65 m, kemiringan dasar sungai di sekitar lokasi pengukuran = 0.00025 Lengkapi dengan Lengkung Debit b) Debit Saluran samping suatu jalan raya dengan data sebagai berikut : Lokasi : Sta 11 + 580 Sta 15 + 570 * Area tepi luar saluran terdiri dari Sungai kecil di daerah dataran dengan kemiringan rata -rata 7.5 % * Kecepatan rata - rata aliran dalam saluran = 2 m/det * Lebar perkerasan jalan L1 = 5.5 m ; Lebar bahu jalan L2 = 1.5 m ; Lebar area tepi luar saluran : L3 = 100 m

2. Perhitungan Curah Hujan Harian Kawasan Dengan Cara Aritmetik

No.

Tahun

Stasiun A (mm)

Stasiun B (mm)

Stasiun C (mm)

xi (mm)

1 2 3 4 5 6 7 8 9 10 11 12

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

97 86 88 78 105 110 98 97 75 63 71 97

99 87 87 75 101 115 97 95 76 67 72 95

101 89 83 71 109 117 93 92 78 65 77 93

99.00 87.33 86.00 74.67 105.00 114.00 96.00 94.67 76.33 65.00 73.33 95.00

Jumlah

1066.33

TABEL Sn Tabel Angka Reduksi Standar Deviasi (Sn) m

0

1

2

3

4

5

6

7

8

10 20 30 40 50 60 70 80 90 100

0.9496 1.0628 1.1124 1.1413 1.1607 1.1747 1.1854 1.1938 1.2007 1.2065

0.9676 1.0696 1.1158 1.1436 1.1623 1.1759 1.1863 1.1945 1.2013

0.9833 1.0754 1.1193 1.1458 1.1634 1.177 1.1873 1.1953 1.2020

0.9971 1.0611 1.1126 1.1480 1.1658 1.1782 1.1881 1.1959 1.2026

1.0095 1.0864 1.1255 1.1499 1.1667 1.1793 1.1890 1.1967 1.2032

1.0206 1.0915 1.1285 1.1519 1.1681 1.1803 1.1896 1.1973 1.2038

1.0316 1.0961 1.1313 1.1538 1.1696 1.1814 1.1906 1.198 1.2044

1.0411 1.1004 1.1339 1.1557 1.1708 1.1824 1.1915 1.1987 1.2049

1.0493 1.1047 1.1363 1.1674 1.1721 1.1834 1.1923 1.1994 1.2065

Pengamatan untuk 12 tahun

Engineering Hydrology by J. Nem

TABEL "Yn" Tabel Angka Reduksi Rata-Rata (Yn) m 10 20 30 40 50 60 70 80 90 100

0

1

2

0.4952 0.4996 0.5035 0.5236 0.5252 0.5268 0.5362 0.5371 0.5360 0.5436 0.5442 0.5448 0.5435 0.5480 0.5493 0.5521 0.5524 0.5527 0.5548 0.5550 0.5552 0.5569 0.5570 0.5572 0.5586 0.5587 0.5589 0.5600 Pengamatan untuk 12 tahun

3

4

5

6

7

8

0.5070 0.5283 0.5388 0.5453 0.5497 0.553 0.5555 0.5574 0.5591

0.5100 0.5296 0.5396 0.5458 0.5501 0.5533 0.5557 0.5576 0.5592

0.5128 0.5309 0.5402 0.5463 0.5504 0.5536 0.5558 0.5578 0.5593

0.5157 0.5320 0.5410 0.5468 0.5508 0.5538 0.5561 0.5580 0.5595

0.5181 0.5332 0.5418 0.5473 0.5511 0.5540 0.5563 0.5581 0.5596

0.5202 0.5343 0.5424 0.5477 0.5515 0.5543 0.5565 0.5583 0.5598

Nilai K Lama pengamatan (tahun) T 2 5 10 20 25 50

Yt 0.3665 1.4999 2.2502 2.9702 3.1985 3.9019

10

15

20

25

30

-0.1355 1.0580 1.8482 2.6064 2.8468 3.5875

-0.1434 0.9672 1.7023 2.4078 2.6315 3.3207

-0.1478 0.9186 1.6248 2.3020 2.5168 3.1787

-0.1506 0.8878 1.5752 2.2348 2.444 3.0884

-0.1526 0.8663 1.5408 2.1881 2.3933 3.0258

100

4.6001

4.3228

4.0048

3.8565

3.7281

3.6533

9 1.0665 1.1086 1.1388 1.1500 1.1734 1.1844 1.193 1.2001 1.2060 Engineering Hydrology by J. Nemec

9 0.5220 0.5353 0.5430 0.5481 0.5518 0.5546 0.5567 0.5585 0.5599

3. Menghitung Analisi Frekuensi Curah Hujan Harian Maximum, dengan Metode Gumbel Dari Curah Hujan di urut dari terbesar ke terkecil Metode Gumbel Perhitungan Hujan Rencana

No.

Tahun

Stasiun A (mm)

Stasiun B (mm)

Stasiun C (mm)

xi (mm)

x (mm)

xi - x

( x - xi )2

1 2 3 4 5 6 7 8 9 10 11 12

2006 2005 2001 2007 2012 2008 2002 2003 2009 2004 2011 2010

110 105 97 98 97 97 86 88 75 78 71 63

115 101 99 97 95 95 87 87 76 75 72 67

117 109 101 93 93 92 89 83 78 71 77 65

114.00 105.00 99.00 96.00 95.00 94.67 87.33 86.00 76.33 74.67 73.33 65.00

88.86 88.86 88.86 88.86 88.86 88.86 88.86 88.86 88.86 88.86 88.86 88.86

25.14 16.14 10.14 7.14 6.14 5.81 -1.53 -2.86 -12.53 -14.19 -15.53 -23.86

631.96 260.46 102.80 50.96 37.69 33.70 2.33 8.19 156.95 201.48 241.11 569.35

Jumlah

1066.33

Dari hasil perhitungan diperoleh n = 12 x rata -rata = 88.86 Sx = 14.4505135 Sn = 0.9833 yn = 0.5035

2296.99

 ( Xi  X ) 2 Sx  n 1

Perhitungan Koefisien K P. Ulang

Yt

Yn

Sn

2 5 10 20 25 50 100

0.3665 1.4999 2.2502 2.9702 3.1985 3.9019 4.6001

0.5035 0.5035 0.5035 0.5035 0.5035 0.5035 0.5035

0.983 0.983 0.983 0.983 0.983 0.983 0.983

K



Yt

 Yn Sn

R max = Xi (rata - rata) + K x Sx P. Ulang

Yt

K

Rmax (mm)

2 5

0.3665 1.4999 2.2502 2.9702 3.1985 3.9019 4.6001

-0.1393 1.0133

86.848 103.504

1.7764 2.5086 2.7408 3.4561 4.1662

114.531 125.112 128.467 138.804 149.064

10 20 25 50 100

Pengamatan 50 Tahun (Rt)

138.804

4. Menghitung Data Curah Hujan Periode Ulang 50 Tahun menjadi Intensif Curah Hujan, dengan menggunakan rumus Momonoce I

=

Rt 24

24 T

=

138.804 24

=

5.783

=

31.289

.

.

2/3

24 1.907

2/3

12.584

2/3

mm/Jam

5. Menghitung Debit Banjir pada Daerah Aliran Sungai a. Kecepatan Aliran H = 20 m L = 5 km = 5000 m V

S

=

72

x

H L

=

72.000

x

=

72.000

x

=

2.622

=

H L

=

20 5000

=

0.00400

b. Waktu Konsentrasi L T = V =

5

0.60

20 5000

0.60

0.00400 0.60

= =

2.62161 1.907

km/jam

c. Koefisien Aliran Koefisien Pengaliran ( c ) ( Untuk perencanaan MAB - Perencanaan Jembatan) Daerah Pegunungan Berlereng Terjal 0.75 0.90 Dearah Perbukitan 0.70 0.80 Daerah Bergelombang dan semak semak 0.50 0.75 Daerah datar yg di garap 0.45 0.60 Daerah persawahan irigasi 0.70 0.80 Sungai di daerah Pegunungan 0.75 0.85 Sungai kecil didaerah dataran 0.45 0.75 Sungai yang besar dengan daerah pengaliran yg lebih 0.50 0.75 dari seperduanya terdiri dari dataran Koefisien yang diambil d. Debit Banjir Sungai pada Daerah Aliran Sungai Q = 0.278 x c x I x A = 0.278 x 0.45 x 31.289 = 58.714

x

15

6. Perhitungan Debit Banjir Berdasarkan Penampang Sungai a. Lebar Sungai 65 m

MAB MAN

50 Lebar rata - rata (B)

= =

m 50 57.5

+ m

65

/

2

b. Koefisien Manning = 0.30 c. Kemiringan Aliran Rata-rata (i) Contoh Hitungan Untuk Elevasi Q = A x V a) Keliling Basah

=

b) Luas Basah

=

c) Jari-jari Hidrolis =

=

0.00025 di sekitar Lokasi Pengukuran

(ΔH)

=

B

+

P

=

P

=

57.5

=

58.5

ΔH

+

2

A

=

57.5

.

=

28.75

m2

R

*

A

0.50

m

=

=

m

2

A

R

B

0.5

ΔH

/

P

=

28.75

/

=

0.491

0.50

58.50

m

d) Kecepatan aliran pada lokasi jembatan V

=

1

/ n

=

1 /

=

0.033

e) Debit Q (m3/detik)

R

i

2/3

0.30

1/2

0.491

0.00025

2/3

m/det =

A

x

V

=

28.750

x

=

0.944

0.033 m3/det

1/2

Perhitungan selanjutnya untuk setiap elevasi dapat di lihat pada tabel berikut : No.

Elevasi

ΔH (m)

Kel. Basah = p (m)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00 10.50 11.00 11.50

0.00 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50

0.00 58.50 59.50 60.50 61.50 62.50 63.50 64.50 65.50 66.500 67.500 68.50 69.50 70.50 71.50 72.50 73.50 74.50 75.50 76.50 77.50 78.50 79.50 80.50

7. Lengkungan Debit

Luas Basah = A R. Hidrolis (m) Kecepatan = V (m/det) (m2) 0.000 28.750 57.500 86.250 115.000 143.750 172.500 201.250 230.000 258.750 287.500 316.250 345.000 373.750 402.500 431.250 460.000 488.750 517.500 546.250 575.000 603.750 632.500 661.250

0.000 0.491 0.966 1.426 1.870 2.300 2.717 3.120 3.511 3.891 4.259 4.617 4.964 5.301 5.629 5.948 6.259 6.560 6.854 7.141 7.419 7.691 7.956 8.214

Debit = Q (m2/det)

0.000 0.033 0.052 0.067 0.080 0.092 0.103 0.113 0.122 0.130 0.138 0.146 0.153 0.160 0.167 0.173 0.179 0.185 0.190 0.195 0.200 0.205 0.210 0.215

0.000 0.944 2.962 5.758 9.199 13.201 17.700 22.648 28.005 33.737 39.815 46.214 52.912 59.891 67.131 74.617 82.335 90.273 98.417 106.756 115.282 123.984 132.853 141.882

GRAFIK LENGKUNG DEBIT

160.00

DEBIT (m³/det)

150.00 141.882

140.00

132.853

130.00

123.984

120.00 110.00 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00

115.282 106.756 98.417 90.273 82.335 74.617 67.131 59.891 52.912 46.214 39.815 33.737 28.005 22.648

115.282

110.00

106.756

100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00

98.417 90.273 82.335 74.617 67.131 59.891 52.912 46.214 Q = 58.71m3/det 39.815 33.737 28.005 22.648 17.700 13.201 9.199 5.758 2.962 0.944 0.000

Δh = 6.40 m

DEBIT (

123.984

120.00

12.00

11.50

11.00

10.50

10.00

9.50

9.00

8.50

8.00

7.50

7.00

6.50

6.00

5.50

5.00

4.50

4.00

3.50

3.00

2.50

2.00

1.50

1.00

0.50

0.00

ELEVASI (m)

Debit = Q (m2/det) 0.000 0.944 2.962 5.758 9.199 13.201 17.700 22.648 28.005 33.737 39.815 46.214 52.912 59.891 67.131 74.617 82.335 90.273 98.417 106.756 115.282 123.984 132.853 141.882

141.882 132.853 123.984 115.282 106.756

417

123.984 115.282

417

106.756

12.00 11.50 11.00 10.50 10.00

PERHITUNGAN DEBIT SALURAN SAMPING

L1 = 5.5 m

L2 = 1.5 m

L3

Lokasi : Sta 11 + 580 Sta * Curah Hujan Maksimum pada periode 10 tahun P. Ulang

Yt

K

Rmax (mm)

2 5 10 20 25 50 100

0.3665 1.4999 2.2502 2.9702 3.1985 3.9019 4.6001

-0.1393 1.0133 1.7764 2.5086 2.7408 3.4561 4.1662

86.848 103.504 114.531 125.112 128.467 138.804 149.064

Pengamatan 10 Tahun (Rt) * * * *

15 =

=

100

+ 570 114.531 mm

114.531

Panjang Saluran (L) = 3990 m Area tepi luar saluran terdiri dari Semak dan pepohonan dengan kemiringan rata -rata 7.5 % Kecepatan rata - rata aliran dalam saluran = 2 m/det Lebar perkerasan jalan L1 = 5.5 m ; Lebar bahu jalan L2 = 1.5 m ; Lebar area tepi luar saluran : L3 = 100 m

Rumus Debit Saluran Cw . It . Qr = 3.6 1. Waktu Konsentrasi

A

atau

Qr

=

0.278

Cw

.

It

.

A

a. Waktu yang diperlukan air untuk mencapai lokasi No.

Kondisi permukaan yg dilalui aliran

nd

1 Lapisan semen dan aspal beton 2 Permukaan halus dan kedap air 3 Permukaan halus dan padat

0.013 0.02 0.10

Lapangan dengan rumput jarang,ladang,dan 4 tanah lapang kosong dengan permukaan cukup besar

0.20

5 Ladang dan lapangan rumput 6 Hutan 7 Hutan dan rimba Koefisien yang diambil

0.40 0.60 0.80

nd k Lt

= = =

koefisien Kelandaian Panjang Total terjauh

t1

t2

=

2 3

.

3.28

.

=

2 3

.

3.28

.

=

63.8766 0.167

=

2.0021

Detik

=

2 3

.

3.28

.

L1/2

.

nd k

=

2 3

.

3.28

.

2.75

.

0.013 2

=

0.0553

0.17

+

=

0.6166

+

=

0.6166

Detik

Lt

.

100

0.0293

nd √k

0.167

.

0.80 7.5

0.167

0.17 +

2 3

.

3.28

.

L2

.

0.17

2 3

.

3.28

.

1.5

.

3.28

0.0000

b. Waktu pengaliran dalam saluran L t3 = 60 . V =

3990 60 .

=

33.2500 Detik

2

c. Waktu konsentrasi Tc = t1 + t2 = 2.0021 + = 35.8687 detik

+ t3 0.6166

+

33.2500

2. Intensitas hujan selama waktu konsentrasi dengan periode ulang 10 tahun Rt It = Tc

=

114.531 35.869

=

3.193

3. Luas daerah pengaliran A = Lt . =

2.8

+

mm/detik

L 1.5

=

104.3

.

=

415958

m2

=

0.4160

Km 2

+

100

3990

.

3990

4. Koefisien pengaliran Tabel : Standar koefisien Limpasan ( C ) berdasarkan kondisi permukaan tanah Kondisi Permukaaan Tanah Jalur lalu lintas

Bahu jalan dan lereng

1. 2. 1. 2. 3. 4.

Koefisien

Jalan Aspal Jalan Kerikil Tanah berbutir halus Tanah berbutir kasar Lapisan batuan keras Lapisan batuan lunak

Tanah Pasiran tertutup rumput

Kelandaian

0 2

Tanah Kohesif tertutup rumput

Kelandaian

0 2

> >

2 7 7 2 7 7

% % % % % %

Atap Tanah Lapangan Taman dipenuhi rumput dan pepohonan Daerah pegunungan datar Daerah pegunungan curam Sawah Ladang / Huma Koefisien yang diambil

0.30 0.50 0.70 0.10

Koefisien Limpasan terhadap permukaaan tanah C1 = 0.70 ( Tabel ) C1 = Jalan aspal C2 = 0.50 ( Tabel ) C2 = Lapisan batuan lunak C3 = 0.70 ( Tabel ) C3 = Sawah (Saluran melewati jalur jalan aspal,batuan lunak,dan sawah) Cw

=

=

= =

C1

.

L1

+ L1

0.70

.

5.5

+ 0.50 . 5.5 + 1.5

3.85

0.6972

+

C2 +

0.75 107.0

0.70 0.30 0.40 0.10 0.70 0.50 0.05 0.10 0.15 0.13 0.18 0.25 0.75 0.20 0.10

. L2

+

L2 +

+ L3

C3

1.5 + 0.70 + 100 70

.

L3

.

100

5. Perhitungan Debit Saluran Cw . It QSal = 3.6 = =

0.697

0.2572

.

.

A

3.193 3.6 m 3/ detik

.

0.4160

m

Panjang Total terjauh

nd k

0.17

0.02 5

0.17

mukaan tanah Koefisien ( C ) 0.30 0.50 -

0.95 0.70 0.65 0.30 0.85 0.75 0.10 0.15 0.20 0.17 0.22 0.35 0.55 0.40 0.25

0.80 0.30

Tabel : Koefisien Kekasaran Manning Jenis Sarana drainase Tak diperkeras

Dibuat ditempat

1. 2. 3. 1. 2.

Tanah Pasir dan kerikil Dasar saluran batuan Semen mortar Beton

3.

Batu belah

1. Pipa beton sentrifugal 2. Pipa beton 3. Pipa bergelombang Koefisien yang diambil

Dipasang ditempat

Koefisien

Pasangan batu adukan basah Pasangan batu adukan kering

0.020 0.025 0.025 0.010 0.013 0.015 0.025 0.011 0.012 0.016

Koefisien (n) -

0.025 0.040 0.035 0.013 0.018 0.030 0.035 0.014 0.016 0.025

PERHITUNGAN DEBIT SALURAN SISI

:

KANAN L

NO

Muara

L1

L2

L3

A

Periode T

nd

k

t1

KM Km2

Awal Proyek

1

2

3



Pelat Deck

Pelat Deck

Pelat Deck

Panjang Saluran

11+580 11+580

-

17+260

5680.0

5.5

1.5

100

0.6078

114.531

0.80

7.5

2.0021

17+260

-

17+335

75.0

5.5

1.5

100

0.0080

114.531

0.80

7.5

2.0021

17+335

-

17+385

50.0

5.5

1.5

100

0.0054

114.531

0.80

7.5

2.0021

17+385

-

17+410

25.0

5.5

1.5

100

0.0027

114.531

0.80

7.5

2.0021

17+410

-

17+465

55.0

5.5

1.5

100

0.0059

114.531

0.80

7.5

2.0021

17+465

-

17+485

20.0

5.5

1.5

100

0.0021

114.531

0.80

7.5

2.0021

17+485

-

17+505

20.0

5.5

1.5

100

0.0021

114.531

0.80

7.5

2.0021

17+505

-

17+555

50.0

5.5

1.5

100

0.0054

114.531

0.80

7.5

2.0021

17+555

-

15+570

-1985.0

5.5

1.5

100

-0.2124

114.531

0.80

7.5

2.0021

15+570

3990.0

5.5

1.5

100

0.4269

114.531

0.80

7.5

2.0021

17+335

17+410

17+485

11+580 -

koefisien limpasan berdasarkan kondisi permukaan tanah c1 = Jalan aspal

c2 = Lapisan batuan lunak c3 = Sawah

DEBIT SALURAN t2

Tc

It

c1

c2

c3

Cw

Qi

Qr KET

mm/jam

m3/dt

m3/dt

37.8667

39.8688

2.873

0.70

0.50

0.70

0.6972

0.3381

0.4093

0.5000

2.5021

45.773

0.70

0.50

0.70

0.6972

0.0711

0.0711

0.3333

2.3355

49.040

0.70

0.50

0.70

0.6972

0.0508

0.0782

0.1667

2.1688

52.808

0.70

0.50

0.70

0.6972

0.0274

0.0274

0.3667

2.3688

48.350

0.70

0.50

0.70

0.6972

0.0551

0.0773

0.1333

2.1355

53.633

0.70

0.50

0.70

0.6972

0.0222

0.0222

0.1333

2.1355

53.633

0.70

0.50

0.70

0.6972

0.0222

0.4925

0.3333

2.3355

49.040

0.70

0.50

0.70

0.6972

0.0508

0.4703

-10.198

0.70

0.50

0.70

0.6972

0.4195

0.4195

3.249

0.70

0.50

0.70

0.6972

0.2686

0.2686

-13.2333 -11.2312

33.2500

35.2521

Related Documents

Hidrologi
April 2020 29
F4
October 2019 25
F4
May 2020 13
F4
November 2019 27
F4
April 2020 15

More Documents from ""