Batas Pembebasan Lahan
0+660
502
CL Batas Tepi Sungai
500
Muka Tanah Asli 0.50
17.28
EL.495.61
0.50
16.00
16.01
EL.495.61
3.50
.0
1.50
15.00
1:1
EL.491.11
Timbunan ( Backfill)
1.00
490
1.00
.0
1:1
1:0.25
5.50
Sungai 1:0.25
4.00
River Bed
4.00
1.50
EL.495.61
495
3.50
Beton Bertulang K.300 Lantai Kerja t = 10 cm
bidang persamaan reference level
JARAK (m) DISTANCE (m)
38.73
2.29
3.50
15.00
3.50
495.689
494.454
495.658
0.52
9.28
8.14
494.064
12.67
494.774 0.89 493.878 1.10 493.818 0.30 494.559 1.96 494.544
492.910 1.09 493.906
11.57
489.000
8.63
489.000
13.08 489.000
9.42
491.989
492.211
492.722
7.41
492.393
13.48
ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL
489.000
JARAK (m) DISTANCE (m)
499.375
501.604
501.424
485.00
ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL
32.56
3.96
KEMENTRIAN PEKERJAAN UMUM AIR SUMBER DAYA JENDERAL DIREKTORAT BALAI BESAR WILAYAH SUNGAI CILIWUNG CISADANE
SNVT PEMBANGUNAN BENDUNGAN BBWS CILIWUNG CISADANE PPK BENDUNGAN CIAWI Gedung SDA CAWANG Lt.4 Jalan D.I Panjaitan Kavling 12 Cawang - Jakarta Timur
Pekerjaan :
SHOP DRAWING PEMBANGUNAN BENDUNGAN CIAWI (CIPAYUNG)
Tahun 2019 Tanda Tangan
KONTRAKTOR
KONSULTAN SUPERVISI
PPK BENDUNGAN CIAWI
Engineering Manager
Tenaga Ahli
Direksi Lapangan
Bottom Outlet
Diperiksa
Gambar :
Nama
0
5
15
20
25
30 m
NO.REV : REV. NO :
TANGGAL : DATE :
DESKRIPSI : DESCRIPTION :
Tanda Tangan
Syafaruddin, ST
Siswanto, ST
Project Manager
Team Leader
Cross Section STA 0+660
Dallyh Sagesti, A.md Nip. 19700927 200701 1 003 PPK Pembangunan Bendungan Ciawi
Skala :
1 : 300
Disetujui No :
Nama Whima Regianto.P,ST,M.APM
SKALA 1 : 300
MC-1 Lokasi :
Ir.Prasdiyanto
KONSULTAN SUPERVISI :
Geri Ramdhan Dazali, ST, MPSDA Nip. 19820627 201012 1 007 KONTRAKTOR PELAKSANA :
ABIPRAYA - SACNA KERJA SAMA OPERASI
INDRA KARYA
YODYA KARYA - INDRA KARYA - INDAH KARYA (KSO)
ABIPRAYA
08-BOT-CS.30