Hanin 8

  • Uploaded by: nizar
  • 0
  • 0
  • August 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Hanin 8 as PDF for free.

More details

  • Words: 290
  • Pages: 1
Batas Pembebasan Lahan

0+660

502

CL Batas Tepi Sungai

500

Muka Tanah Asli 0.50

17.28

EL.495.61

0.50

16.00

16.01

EL.495.61

3.50

.0

1.50

15.00

1:1

EL.491.11

Timbunan ( Backfill)

1.00

490

1.00

.0

1:1

1:0.25

5.50

Sungai 1:0.25

4.00

River Bed

4.00

1.50

EL.495.61

495

3.50

Beton Bertulang K.300 Lantai Kerja t = 10 cm

bidang persamaan reference level

JARAK (m) DISTANCE (m)

38.73

2.29

3.50

15.00

3.50

495.689

494.454

495.658

0.52

9.28

8.14

494.064

12.67

494.774 0.89 493.878 1.10 493.818 0.30 494.559 1.96 494.544

492.910 1.09 493.906

11.57

489.000

8.63

489.000

13.08 489.000

9.42

491.989

492.211

492.722

7.41

492.393

13.48

ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL

489.000

JARAK (m) DISTANCE (m)

499.375

501.604

501.424

485.00

ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL

32.56

3.96

KEMENTRIAN PEKERJAAN UMUM AIR SUMBER DAYA JENDERAL DIREKTORAT BALAI BESAR WILAYAH SUNGAI CILIWUNG CISADANE

SNVT PEMBANGUNAN BENDUNGAN BBWS CILIWUNG CISADANE PPK BENDUNGAN CIAWI Gedung SDA CAWANG Lt.4 Jalan D.I Panjaitan Kavling 12 Cawang - Jakarta Timur

Pekerjaan :

SHOP DRAWING PEMBANGUNAN BENDUNGAN CIAWI (CIPAYUNG)

Tahun 2019 Tanda Tangan

KONTRAKTOR

KONSULTAN SUPERVISI

PPK BENDUNGAN CIAWI

Engineering Manager

Tenaga Ahli

Direksi Lapangan

Bottom Outlet

Diperiksa

Gambar :

Nama

0

5

15

20

25

30 m

NO.REV : REV. NO :

TANGGAL : DATE :

DESKRIPSI : DESCRIPTION :

Tanda Tangan

Syafaruddin, ST

Siswanto, ST

Project Manager

Team Leader

Cross Section STA 0+660

Dallyh Sagesti, A.md Nip. 19700927 200701 1 003 PPK Pembangunan Bendungan Ciawi

Skala :

1 : 300

Disetujui No :

Nama Whima Regianto.P,ST,M.APM

SKALA 1 : 300

MC-1 Lokasi :

Ir.Prasdiyanto

KONSULTAN SUPERVISI :

Geri Ramdhan Dazali, ST, MPSDA Nip. 19820627 201012 1 007 KONTRAKTOR PELAKSANA :

ABIPRAYA - SACNA KERJA SAMA OPERASI

INDRA KARYA

YODYA KARYA - INDRA KARYA - INDAH KARYA (KSO)

ABIPRAYA

08-BOT-CS.30

Related Documents

Hanin 8
August 2019 26
Hanin
December 2019 4
8-8
October 2019 85
8 8
August 2019 108
8
October 2019 33
8
June 2020 17

More Documents from ""