Khulna University
Urban and Rural Planning Discipline
URP 3264 GIS for Planning Applications Monday 14:30-17:00 Content and schedule of the course
Week
Lab Task
1
Exercise 1 : Introduction to ArcCatalog
2
Exercise 2: Introduction to ArcMap Exercise 3: Geographic information and spatial data types
3
Exercise 4: Data Entry and Management
4 5
Evaluation 1(Lab Exam. and Quiz) Assignment 1 Developing Spatial Database: On screen digitizing from toposheet, Feature segregation, storing attributes. Evaluation: completeness, quality, accuracy.
6-7
Assignment 2: Toposheet: Editing finalizing and re-production Transforming topo to real world coordinates and joining with adjoins, Printing Evaluation: quality, accuracy.
8
Exercise 5: Tabular data and basic queries
9
Exercise 6: Spatial queries
10
Exercise 7: Measurement Operations
11 12
Evaluation 2 (Written and Lab. Exam) Assignment 3: Final Project
Final Evaluation
Assessments Evaluation 1
10%
Lab. based exam and quiz
Assignment 1
10%
Assignment 2
15%
Assessment on digital version of map(s) Digital version[5], printing (single and composite)[5], presentation[5]
Evaluation 2
15%
Lab based exam. and quiz
Assignment 3
10%
Report and presentation
Attendance
10%
Class attendance
Final Assessment
30%
(may not be formal viva-voce only, rather a presentation on final project)
Notes • • • • • • • •
Every weekly class will have a lecture and corresponding practical with computers Since class schedule is provided earlier, it is expected to have minimum preparation by all students For digital submission students are responsible to put their ‘work’ in right place (pc, folder etc) by right time. Data format must be identical to ‘project brief’. Report is to submit to the discipline office in time. If any student remain absent in any assessment ‘ceremony’, s/he will get ‘0’ as grade. There will be deduction on the achieved grade for any delayed submission. For ‘hartal’ or ‘strike’ on any ‘evaluation’ day, the evaluation will shift to the next day NOT next week If any student is found to adopt any unlawful means in lab-test or quiz or projects, the only minimum possible punishment is ‘F’ grade in this course.
Good Luck,
Ahsanul Kabir - -2 /var/www/apps/pdfcoke/pdfcoke/tmp/scratch1/9650027.doc
Muslay Uddin Ahmed
URP 3264: Geographical Information System for Planning Applications (Lab./Project) Monday 14:30-17:00 Content and schedule of the course
Week
Lab Task
1
Exercise 1 : Exercise 7 (route) and Exercise 8 (allocation) of PC Network Analysis (take away exercise)
2
Project 1:
3
Exercise 2: ArcGIS Exercise : Spatial queries
4 5
Project 1 submission Quiz 1 Lab test 1
6
Linear Referencing and Location Model
7
Exercise 4: Accessibility Analysis
8
Individual Final Assessment (individual project using the tools and techniques learned in this term)
9
Exercise 3: ArcGIS Exercise : Spatial Analysis with Raster Data
10 11 12-13
Application of Network Analysis (group project, submission on small poster)
(1 August 2005) (8 August 2005) (8 August 2005)
(accessibility, node distance, OD matrix)
Quiz 2 Lab test 2 IFA Presentation IFA submission - -3 /var/www/apps/pdfcoke/pdfcoke/tmp/scratch1/9650027.doc
Assessments Project 1
10%
Group Project. Poster Submission (a3 or 2 A4)
Quiz 1
5%
PC Network Analysis (route, allocation) and spatial queries
Lab test 1
10%
PC Network Analysis (route, allocation) and spatial queries
Quiz 2
5%
Linear referencing and location model, spatial analysis with raster data
Lab test 2
10%
Linear referencing and location model, spatial analysis with raster data
IFA
20%
Work on individual Report (and poster) and presentation.
Attendance
10%
Class Attendance.
Final Assessment
30%
(may not be formal viva-voce only, rather a presentation on final project)
Notes • • • • • • • •
Every weekly class will have a lecture and corresponding practical with computers Since class schedule is provided earlier, it is expected to have preparation by all students For digital submission students are responsible to put their ‘work’ in right place (pc, folder etc) by right time. Data format must be identical to ‘project brief’. Report is to submit to the discipline office in time. If any student remain absent in any assessment ‘ceremony’, s/he will get ‘0’ as grade. There will be deduction on the achieved grade for any delayed submission (5% for each day). For ‘hartal’ or ‘strike’ on any ‘evaluation’ day, the evaluation will shift to the next day (lunch time) NOT next week If any student is found to adopt any unlawful means in lab-test or quiz or projects, the only possible punishment is ‘F’ grade in this course.
Good Luck, - -4 /var/www/apps/pdfcoke/pdfcoke/tmp/scratch1/9650027.doc
Ahsanul Kabir
- -5 /var/www/apps/pdfcoke/pdfcoke/tmp/scratch1/9650027.doc