Generic Skill

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Generic Skill as PDF for free.

More details

  • Words: 3,945
  • Pages: 39
PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

UNIVERSITI TEKNOLOGI MALAYSIA FACULTY OF CIVIL ENGINEERING

HIGHWAY ENGINEERING - SAB 2832 SEMESTER I - SESSION 2008/2009

NAME SECTION / GROUP IC NO. MATRIX CARD LECTURER DATE OF SUBMISSION

: : : : : :

MARDHIYAH SYAHIDA BT BERHANUDDIN 2 SAW (SECTION 3) / GROUP 2 870723035290 BA 080032 HAJI CHE ROS BIN HAJI ISMAIL 29 / 08 / 2008

1

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

T

his assignment is designed to evaluate our generic skill on problem solving or ability to think critically, identify, formulate, and solve the civil engineering related problems.

As a potential highway engineer in my country, I am instructed by Works Ministry to give a report on a highway construction problem in my country. This report is provided based on a real problem on highway construction (Highway Engineering). The problem was occurred in a real project in Selangor. This project is known as PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN. In this report, consist that a lot of problem occured during the construction and possible suggestions which is can overcome the whole problems.

2

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

KERAJAAN MALAYSIA JABATAN KERJA RAYA

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

No. Kontrak : KKR/JKR/UB/63/2003

HIGHWAY CONSTRUCTION PROBLEMS REPORT Provided by:

MARDHIYAH SYAHIDA BT BERHANUDDIN HIGHWAY ENGINEER

JABATAN RIRA BINA JV

KERJA RAYA MALAYSIA

PERKIM (DAMANSARA UTAMA) –

CAWANGAN JALAN Cawangan Jalan ( Tingkat 15 ),

Letter Box No. 78

Ibu Pejabat JKR Malaysia,

Level 18, UBN Tower

Jalan Sultan Salahuddin,

No. 10, Jalan P. Ramlee

50582 Kuala Lumpur.

50250 Kuala Lumpur.

3

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

Tel : 603 – 2691 9011 Fax : 603 – 2693 6662

Tel : 603 – 2023 2088 Fax : 603 - 2023 1688

TABLE OF CONTENTS

1)

No

Title

Page

1.0

Description of The Project

2.0

Project Information

3.0

Location & Layout Plan

4.0

Related Photo

5.0

Description of The Problems & Possible Solutions

6.0

Recommendations

7.0

Appendixes

8.0

References

Description of The Project

The project is a part of the Government of Malaysia plan to upgrade the existing Federal route FT015 and B9 from Terminal 3 of Subang Airport to Sungai Buloh Hospital. 4

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

The original contract sum of the project for Phase 1 is RM 130,000,000.00 which will be constructed over a period of twenty four (24) months. The site possession on 15th September 2003 and the original completion date shall be on 11th September 2005. The Supplementary Agreementb No. 1 for Phase 2 has been approved by JKR dated 02/08/2006. The Phase 2 contract sum is RM 139,500,000.00 which will be constructed for a period of 24 months. The date of possession of site for Phase 2 on 17th July 2006 and the original date of completion shall be on 16th July 2008. The Extension of Time No. 3 has been approved by JKR until 9th October 2008 due to delay on site possession caused by land matters. The new completion date is 9th October 2008. Meanwhile, the remaining works under Phase 1 contract still pending due to water mains relocation work along MCAO alignment by others and at this stage salvaging of the existing main pipe in progress.

2)

Project Information

2.1)

Intoduction

The Government of Malaysia intends to upgrade the existing Federal Route FT015 and B9 from Terminal 3 of Subang Airport to Sungai Buloh Hospital with approximately 12.0 km in length. The previous access to the Sungai Buloh Hospital is via the state road B9, a 2-lane single carriageway linked to the FT054 through a diamond interchange. It is also necessary to upgrade the state road B9 from Subang Airport FT015 to linkup FT002 with FT054 in order to improve traffic flow as heavy vehicles and other commercial vehicles heavily traverse the state road B9. In order to ease the traffic flow, as well as to cater for the future development, the contract “Cadangan Projek Menaiktaraf Laluan B9/FT015 dari Lapangan Terbang Subang ke Hospital Sungai Buloh” has been awarded to Perkim (Damansara Utama)-Rira Bina Sdn. Bhd. JV by the Government via Design and Build Contract comprise of Phase 1 and Phase 2. 2.2)

Project Description

Phase 1 The combination of half-diamond interchange and the trumpet interchange implemented at the existing Sungai Buloh Junction to provide a mainline link to the new Sungai Buloh Hospital.

5

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

A new half-diamond interchange at the existing intersection between B9 and Route 54 will accommodate for the right turning movement from Route 54 or Jalan Hospital to Subang and from B9 to Route 54, Kepong direction. This allow for free flow movement at the existing Route 54. The works also involve upgrading Jalan Hospital from two (2) lane single carriageway to two (2) dual carriageway. The work components of the Phase 1 project shall comprise the following :(a) Upgrading of existing Jalan Hospital from Hospital Sungai Buloh to the Sungai Buloh interchange. (b) Construction of new Sungai Buloh Interchange inclusive of new half diamond and modified trumpet interchange. (c) Vehicular underpass at KTM access road. (d) Pedestrian bridges. (e) Pedestrian box culvert. (f) Sungai Gasi river bridge inclusive river protection work. (g) Relocation of Water Mains. (h) Works include relocation, replacement and construction of services including TNB, SYABAS, Telekom and all other associated works. Phase 2 The proposed works involve the upgrading of certain stretches of existing State road B9, Federal Route 15 and construction of new alignment of Federal Route 15 between Terminal 3 Airport to existing T-Junction Batu Tiga – Sg. Buloh. The total length of works involved covers a distance of approximately 9 km. The geometric of the upgrading road shall be design to JKR U5 Standard. The road shall be 4-lane dual carriageway and paved shoulder on both side of carriageway. It comprises of the following major component. (a) Upgrading of five (5) at-grade signalized junction along State Road B9 as follows:i.

Pinggiran Subang incorporation Batu Tiga – Sungai Buloh Junction.

ii.

Rubber Research Institute (RRI) Junction.

iii.

Sg. Buloh Industrial Park Junction.

iv.

Kota Damansara Junction.

v.

Sri Sg. Buloh Junction.

6

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

(b) Construction of two (2) new at-grade signalized junction along new alignment of Federal Route 15 as follows:-

2.3)

i.

Kg. Muhibbah Junction.

ii.

Airod Junction.

Scope Of Works

1. Roadwork (a) Site Clearance and earthworks. (b) Construction of approach and slip road as well as ramps including earthworks, flexible pavement, shoulder and associated works. (c) Provide and install street lightings, furniture, guardrails and necessary road markings as well as landscaping works. (d) Traffic Management. 2. Drainage (a) Construction of R. C. pipe culverts and R. C. box culverts including diversions, excavation of unsuitable materials for foundation. (b) Construction of ancillary drainage works including catchpits, diversions and scour protection works. (c) Construction of roadside drain, berm and toe interceptor drains.

3. Structures Phase 1 (a) New Sg. Buloh Interchange inclusive of new half diamond and modified existing to trumpet interchange. (b) Sg. Gasi River Bridge. (c) Vehicular Underpass at KTM access road. (d) Retaining walls of rubble type, reinforced concrete or reinforced earth wall. (e) Pedestrian Bridges. 7

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

(f) Pedestrian Box Culvert. Phase 2 (a) Sg. Damansara (2 nos bridges). (b) Pedestrian Bridge. (c) Retaining wall. (d) River diversion at Sg. Damansara.

4. Services Works include recolation, replacement of services including TNB, Telekom, Maxis, Celcom and all other associated works by others whereas SYABAS water pipe recolation for Phase 2 will be carried out by the main contractor. Meanwhile, SYABAS water pipe recolation on Phase 1 is in progress by others.

Project Summary NAME OF PROJECT CADANGAN PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN.

EMPLOYER CONTACT PERSON: JABATAN KERJA RAYA MALAYSIA, CAWANGAN JALAN, JLN SULTAN SALAHUDDIN, 50582 KUALA

1)

Ir. Abd. Rahman Abd. Aziz

LUMPUR.

2)

Ir. Sheikh Ismail Sheikh Salleh

3)

En. Shukri Ishak

8

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

DESIGN & BUILT CONTRACTOR

PERKIM (DAMANSARA UTAMA) – RIRA BINA JV LETTER BOX NO. 78, LEVEL 18, UBN TOWER,

CONTACT PERSON: 1)

En. Md. Ismail Abd. Kader

2)

Ir. Rofie Sarbini

3)

En. Ahmad Ismail Nik Aman

NO. 10, JALAN P. RAMLEE, 50250 KUALA LUMPUR.

SITE OFFICE: NO. 3-1, 1st FLOOR, JLN DINAR E, U3/E, SEKSYEN 3, TMN SUBANG PERDANA, 40150 SHAH ALAM, SELANGOR DARUL EHSAN. CONSULTING ENGINEERINGS

PERUNDING SSE

CONTACT PERSON:

2-2, JLN IMPIAN PERDANA 1 SAUJANA IMPIAN

1)

Ir. Shahbudin Anuar

2)

Ir. Ilyas Ibrahim

3)

En. Zaini Ibrahim

43000 KAJANG SELNGOR. 1)

Ir. Teh Ming Hu

SEPAKAT SETIA PERUNDING SDN BHD

2)

Ir. Izam Razali

WISMA SSP LEVEL 8-18

3)

Ir. Shuhaimi Mohd

NO. 1 JLN SR 8/3 SERDANG RAYA SEKSYEN 8 43300 SERI KEMBANGAN SELANGOR. INDEPENDENT CHECKER (STRUCTURE)

T-CROP ENGINEERING SDN. BHD. NO. 80-B, JALAN SS21/39,

CONTACT PERSON:

1)

Ir. Tham Kum Weng

DAMANSARA UTAMA, 47400 PETALING JAYA, SELANGOR. TEL : 03-7710 1382 FAX : 03-7710 1398 GEOTECHNICAL

PERUNDING ZMS SDN. BHD.

CONTACT PERSON:

NO. 50/3, LORONG 6C/91,

1)

TAMAN SHAMELIN PERKASA,

9

Ir. Saidin Abu Bakar

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

BATU 3 ½, JALAN CHERAS, 56100 KUALA LUMPUR. TEL : 03-9200 3734

ROAD SAFETY AUDITOR

PB-TRSS CONSULTING,

CONTACT PERSON:

NO. 9, JALAN SS 15/4C,

1)

Ir. Che Ali b. Che Hitam

SUBANG JAYA, 47000 PETALING JAYA, SELANGOR. TEL : 03-5633 6899

ORIGINAL CONTRACT DETAILS

Phase

Phase 1

Phase 2

RM 130,000,000.00

RM 139,500,000.00

Commencement Date (Original)

15 th September 2003

17 th July 2006

Completion Date (Original)

11 th September 2005

16 th July 2008

Contract Sum

9 th October 2008

Completion Date (Revised)

Construction Period (Original)

104 Weeks (24 Months)

27 Months

Construction Period (Revised)

Defect Liability Period

Road Length (km)

24 Months

24 Months

24 Months

4.5 km

9.0 km

10

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

11

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

JABATAN KERJA RAYA PROJECT DIRECTOR’S ORGANISATION CHART

12

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

Line of Communication Government of Malaysia Jabatan Kerja Raya

Government

Reporting to

Reporting to

Auditing Consultants

Structure Auditor T-Corp

Geotechnic Auditor Perunding ZMS

Safety Auditor Perunding TRSS

Utilities Companies TNB, Telekom, Maxis,Time, PUAS

Appointed

Appointed

Landscaping ANZ Landscape S/B

Design Consultant Sepakat Setia Perunding

arde w A

Design Consultants

arde w A

Design and Build Contractor Perkim(Damansara Utama)-Rira Bina JV

Specification & Construction Drawings Specification & Construction Drawings

pointed A

Traffic Management T&D Consult S/B

Supervising

Supervising Consultant Sepakat Setia Perunding

arde w A

Supervision Consultants

Contractor

Contractors Utilities Relocation

Landscape Contractor TBA

Sub-Contractor Subcontractors To Be Awarded

13

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

3)

Location & Layout Plan

UPGRADING OF ROAD ALIGNMENTS

4)

Related Photo

14

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

Signboard Of The Project

Road Location

15

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

16

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

17

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

5)

Description of The Problems & Possible Solutions

There are several problems that caused the extended period in project constructions:

Structure Component: DAMAGED OF L-SHAPE DRAIN AT SG. DAMANSARA RIVER TRAINING WORK The construction of L-shape structure for river training works were begin on February 2007 between Ch. 0m to Ch. 250m (LHS). The affected location by the major flood is on the down stream (LHS) of the river alignment.

The affected portion is between Ch. 80m to Ch. 125m (WB017 to WB026) which completed with the capping beam structure on March 2007. However, during heavy down pour dated 14/04/2007, sudden increase of water levels was happen due to accumulate volume from the up 18

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

stream section. The up stream section was widened by JPS’s project. The accumulate volume were flowing through the L-shape section at that time is under construction.

At the same time, it was created overflow condition on top of L-shape section. The problem arises when the existing river at down stream side yet to be widened by JPS’s project during incident. Hence, this situation was created the bottleneck and scouring action and damaged the portion of completed L-shape at down stream side especially at the bend with drain outlet discharge points.

19

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

General View RE Wall (MCDO) towards Sungai Buloh

CAST IN-SITU DECK RIB BEAMS AND SLAB CRACKINGS – (PROPOSED SG. BULOH EXPRESSWAY UPGRADING WORKS – MCAO) Issue Date : July 2005 The content of this problem deals with the cracking of cast in-situ rib beams and deck slab top cracking incidence observed on the Span 1 Left Hand Side deck slab from Abutment A to Pier 1. On the morning of 18 July 2005, the side formworks of the outer faces of the deck’s rib beams and cantilever flanges were stripped.

Several vertical crack lines were seen on both of the exposed surfaces. The finishing on the concrete surfaces were considered very good without obvious blemishes. Concreting of the said sections was done on the evening of 27th of June from approximately 6pm until 2am the following day. The total concrete volume in this single pour was 314m 3. The method of placing of concrete was by means of concrete pump. Thus, the average speed of concreting is almost 40 m3 per hour. The weather report during the whole concreting operation was reported as fine. The 20

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

concrete supply to site was considered consistent and supply trucks were delivering and discharging the loads in an orderly manner. The proposed concrete mix was of Grade 50 nominal strength with cement content of 460Kg/m3 and the water cement ratio is 0.37. The cube samples taken for this batch of concrete pour were sent for testing and the results for 7-days strength and 28-day strength were considered within the expected range. The average cube test results show that the 7-days strength was of average 44MPa while the 28-days strengths is not available as of this date.

The top surface of deck slab was sprayed with proprietary curing compound before the anticipated 2-hour setting time. However, some isolated crack lines were observed on the following day. The cracking patterns were in random and appeared to be fan-out shape. The surface cracks observed on the vertical faces of the exposed rib beams after formwork stripping is presented in Appendix A of this report. There were about 8-10 crack lines on each of the vertical surface. The crack lines are almost vertical, and the maximum crack width when measured on site is approximately 0.35mm measured by inspection with a transparent plastic marked with varying line thicknesses and superimposed over the crack locations. Most of the crack line extend from soffit to the underside of the cantilever flange, but some are discontinuous and less than 750mm long either near the soffit of the rib or near to the underside of the flanges. It is also observed that the first crack line started approximately at 5-7m from the either end of the stop ends.

Slope Component: SLOPE FAILURE. Issue Date : May 2008

21

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

22

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

23

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

Traffic and Safety Management: Issue Date : DURING CONSTRUCTION

24

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

6)

Recommendations 25

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

Structure Component: Rapid drying of the concrete will significantly increases the possibility of cracking. The chemical reaction which causes concrete to go from the viscous or plastic state to a solid state requires water and heat is generated in the process. Shrinkage is a primary cause of cracking in freshly set concrete. As concrete hardens and dries, it shrinks. This is due to the loss of water through evaporation before the complete hydration has taken place. Rapid cooling of external surfaces and fast building up of hydration heat within the inner core creates a drastic thermal gradient across the concrete section. These two extreme phenomenon poses the greatest threat to undermine the weak tensile strength within the concrete. The effects of prestressing forces will tend to substantially close, if not complete, the cracks present on the rib surfaces. The recommendations are suggested as following below: 1. For the isolated cracks observed on the top of deck slab, it is required that liquid curing compound will still be applied after completion of concreting work but not more than 2 hours after pouring on any part of the surface. In addition, covering with plastic sheets or wet Hessian are proposed to lower the possibility of top surface cracking. It is recommended that these additional measures be carry out for at least 5 days continuously after concreting works. 2. It is proposed to control the speed of concrete placement carefully in order to minimize the amount of heat trapped inside of the rib core by allowing heat to escape freely over a reasonable larger open area. Timing of subsequent layer pour must not exceed the anticipated setting time of the previous poured and vibrated load in order to avoid the forming of cold joint across separately laid layers. 3. To limit the length of each pour operation to a smaller distance to reduce the possibility or quantum of cracking, if any, but on the other hand, also achieve reasonable work progress. 4. To carry out through inspection on the line and levels of formwork and falsework in order to reduce the external factors to it minimum.

26

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

5. After prestressing, majority of the crack lines will be closed due to the compression introduced to the rib. If cracks were not fully closed, it is proposed that high strength epoxy grout be injected into the cracks to seal it off completely.

Slope Component: Failure of slope stability such as landslides cause property damage, injury, and death and adversely affect a variety of resources. For example, water supplies, fisheries, sewage disposal systems, forests, dams, and roadways can be affected for years after a slide event. The negative economic effects of landslides include the cost to repair structures, loss of property value, disruption of transportation routes, medical costs in the event of injury, and indirect costs, such as lost timber and fish stocks. Water availability, quantity, and quality can be affected by landslides. Geotechnical studies and engineering projects to assess and stabilize potentially dangerous sites can be costly. RC Retaining Wall:

27

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

28

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

Traffic and Safety Management:

The control of vehicular traffic movement at the worksite and at public areas requires an organized traffic management system, as some of the work will be performed at public roads.

i)

At Worksite 

Proper traffic signages shall be erected at the worksite to guide worker and drivers of vehicles on speed limit and other traffic requirement.



An orderly traffic flow system shall be established for the smooth flow of vehicular traffic in the worksite



When access roads are partially obstructed, proper traffic management signages shall be posted (i.e detour signs shall be properly posted)



During nights hours proper flashing amber lamps and reflectorized signages (if required flagmen) shall be posted to guide vehicular traffic.

ii)

Public road 29

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN



Prior to commencement of work, flagmen shall be deployed and traffic signages shall be placed at the work area to direct and caution motorist of the impending works. (ie traffic signages – safety cones, reflectorized traffic signs, flashing ambler lamps)



Flagmen shall be deployed at areas where vehicular traffic need to be guided and at locations where trucks and heavy equipment enter and exit. Wash troughs shall be installed at the entrance to public roads.



During the night, work areas shall be properly posted with reflectorized traffic signages and flashing amber lamps.



All workers engaged in traffic management shall wear safety reflective vest.

Note : Traffic management method statement shall be developed. 

No unauthorized usage of transport shall be tolerated. All drivers must comply with the following basic rules.

iii)



Valid driving licences



Follow traffic rules especially load and speed limit



Never drive when tired



Make sure the vehicle is in good condition and properly maintained.

Emergency Response Team (ERT)  

The ERT works round the clock

Each team consists of 1 foreman cum driver and 2-traffic controller equipped with 1 no of vehicle and equipment for arranging emergency road closure.



ERT is to assist the public in case of any accident occur along the work area. 



ERT is to ensure there are no potholes left unattended

ERT to control traffic flow in case of traffic light black out or malfunction until police traffic arrived to take over or the light rectified and repaired.



ERT is also trained to intercept any incomings or emergencies at any time, place or situation and condition. 30

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

7)

Appendixes

Appendix A

31

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

32

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

Appendix B (SCENERY)

33

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

34

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

8)

References

a) Project Report - PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

35

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

b)

PERUNDING SSE

c)

d)

e)

36

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

37

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

38

PROJEK MENAIKTARAF LALUAN B9/FT015 DARI LAPANGAN TERBANG SUBANG KE HOSPITAL SUNGAI BULOH, SELANGOR DARUL EHSAN

39

Related Documents

Generic Skill
May 2020 15
Skill
June 2020 27
Selling Skill
May 2020 16
Skill Table
November 2019 39
Skill Set
July 2020 9
Language Skill
November 2019 42