Phase III
The same old TOPS with a brand new face…..
OPR: TCJ6-P-DPS
UNCLASSIFIED
1
Why Phase III… • NTS and DPM not yet available in DPS • Same TOPS functionality, eliminating impact to work flow • Reduces need for local TOPS System Administrator • Integrated into DPS environment • Robust Failover/Data Archiving
OPR: TCJ6-P-DPS
UNCLASSIFIED
2
How it works…
• User credentials are authenticated via ETA • User selects “TOPS” from the DPS menu • User selects a GBLOC from the pick list and clicks on the GO button • User is automatically directed into the Citrix Web Interface • User Logs in to TOPS as normal
OPR: TCJ6-P-DPS
UNCLASSIFIED
3
PHASE III Implementation At each TOPS site: • Each user must register for ETA DPS Role • Install the DOD CA-13 certificate on client workstations • Install Citrix Client if needed
OPR: TCJ6-P-DPS
UNCLASSIFIED
4
Phase III Rollout •
Retrieval of database dump from current TOPS sites
•
JPMO installs TOPS data dumps into new production environment
•
Users access TOPS via DPS
•
All applications on TOPS servers are sunset
OPR: TCJ6-P-DPS
UNCLASSIFIED
5
Reference Guides •
“How to” Guide for Phase III
•
User Access Guide
•
How to Load DOD CA-13 certificate
OPR: TCJ6-P-DPS
UNCLASSIFIED
6