DAILY LESSON LOG November 19-23 , 2018 SECTOR: Construction Industry LESSON: Learning competency
the Content/Topic Content standard
MPONDAY/TUESDAY/WEDNESDAY PERFORM ROUGHING-IN ACTIVITIES FOR COMMUNICATION AND DISTRIBUTION SYSTEM (RC) Install 3 way switches circuit using PVC
The use of PVC pipe in electrical installation The learner demonstrates an understanding of the principles in performing roughing-in activities.
Code TLE_IAEI9- 12RC-IIIa-j-1 Materials 3 way switches, wire, LH, Bulb and male plug and PVC Reference/s: 1. Azares, Efren F and Recana, Cirilo B. Practical Electricity III 2. Fajardo,Module Max B.and title: Fajardo, Leo R. Electrical Layouts and Estimates. 2. Lay-out and estimate LM pp____ TG pp____ Learning Procedure: Preliminaries: a. Prayer Activities b. Greetings Drill/Review Methodology: Demonstration/Discussion Strategy: Group work/Reporting Assessment: Use PVC in the 3 way switches circuit installation Assignment: Bring one CPC (corrugated plastic conduit). Remarks: No. of Learners with a. Mastery b. Needing enrichment Refinement lessons: Teachers Reflection Prepared by: ______________ EIM Trainer
COURSE: Electrical Inastallation and maintenance NC-II THURSDAY/FRIDAY PERFORM ROUGHING-IN ACTIVITIES FOR COMMUNICATION AND DISTRIBUTION SYSTEM (RC) Install 4 way switches circuit using CPC/Compute the load consumption for 4 way switches circuit/Discover the elements present in an insulator. The use of CPC in electrical installation The learner demonstrates an understanding of the principles in performing roughing-in activities.
TLE_IAEI9- 12RC-IIIa-j-1 3 way switches, 4 way switch, wire, LH, Bulb and male plug, CPC. TG pp—14
Preliminaries: a. Prayer b. Greetings Drill/Review Demonstration/Discussion Group work/Reporting Use CPC in the 4 way switches circuit installation. Bring your own tools for the next activity. No. of Learners with a. Mastery b. Needing enrichment Refinement lessons
Checked by:
______________________ TLE Coordinator/MT-I