September 10-14 , 2018 SECTOR: Construction Industry LESSON: Learning competency Content/Topic Content standard
MPONDAY/TUESDAY/WEDNESDAY PERFORM ROUGHING-IN ACTIVITIES FOR COMMUNICATION AND DISTRIBUTION SYSTEM (RC) LO 2.2 Install wire ways and cable trays according to the job requirements following PEC and NEC PEC/NEC provisions on wire ways and cable trays The learner demonstrates an understanding of the principles in performing roughing-in activities.
Code TLE_IAEI9- 12RC-IIa-j-1 Materials PEC/NEC chart Reference/s: 1. Azares, Efren F and Recana, Cirilo B. Practical Electricity III 2. Fajardo,Module Max B.and title: Fajardo, Leo R. Electrical Layouts and Estimates. 2. Lay-out and estimate LM pp____ TG pp____ Learning Procedure: Preliminaries: a. Prayer Activities b. Greetings Drill/Review Methodology: Demonstration/Discussion Strategy: Group work/Reporting Assessment: Recite the PEC/NEC provisions in the class Assignment: Bring written safety procedures and OHS guidelines. Remarks: No. of Learners with a. Mastery b. Needing enrichment Refinement lessons: Teachers Reflection Prepared by : ________________ EIM Trainer
COURSE: Electrical Inastallation and maintenance NC-II THURSDAY/FRIDAY PERFORM ROUGHING-IN ACTIVITIES FOR COMMUNICATION AND DISTRIBUTION SYSTEM (RC) LO 2.3 Observe safety procedure in installing wire ways and cable trays according to OHS guidelines and procedures Procedure in installing wire ways and cable trays The learner demonstrates an understanding of the principles in performing roughing-in activities.
TLE_IAEI9- 12RC-IIa-j-1 Procedures of wire ways and cable tray installation. TG pp—13
Preliminaries: a. Prayer b. Greetings Drill/Review Demonstration/Discussion Group work/Reporting Explain why we have to follow OHS guidelines and observe safety?. Bring panel board and 30A circuit breakers.
Checked by: _________________ TLE Coordinator/MT-I