Dll 16.docx

  • Uploaded by: Abigail Montes
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Dll 16.docx as PDF for free.

More details

  • Words: 247
  • Pages: 1
DAILY LESSON LOG October 8-12 , 2018 SECTOR: Construction Industry LESSON: Learning competency

the Content/Topic Content standard

MPONDAY/TUESDAY/WEDNESDAY PERFORM ROUGHING-IN ACTIVITIES FOR COMMUNICATION AND DISTRIBUTION SYSTEM (RC) LO 4. Install cable bridge

PEC provisions on cable bridge The learner demonstrates an understanding of the principles in performing roughing-in activities.

Code TLE_IAEI9- 12RC-IIa-j-1 Materials PEC chart on cable bridge Reference/s: 1. Azares, Efren F and Recana, Cirilo B. Practical Electricity III 2. Fajardo,Module Max B.and title: Fajardo, Leo R. Electrical Layouts and Estimates. 2. Lay-out and estimate LM pp____ TG pp____ Learning Procedure: Preliminaries: a. Prayer Activities b. Greetings Drill/Review Methodology: Demonstration/Discussion Strategy: Group work/Reporting Assessment: Demonstrate to the class pec provision on cable bridge Assignment: Bring tools needed in the installation of cable bridge. Remarks: No. of Learners with a. Mastery b. Needing enrichment Refinement lessons: Teachers Reflection Prepared by: _______________ EIM Trainer

COURSE: Electrical Inastallation and maintenance NC-II THURSDAY/FRIDAY PERFORM ROUGHING-IN ACTIVITIES FOR COMMUNICATION AND DISTRIBUTION SYSTEM (RC) LO 4.1 Prepare tools/equipment and materials needed for the installation of cable bridge in line with job requirements/Determine the mass of the bridge/calculate the length of wire needed. Procedure in installing cable bridge The learner demonstrates an understanding of the principles in performing roughing-in activities.

TLE_IAEI9- 12RC-IIa-j-1 Procedures of wire ways and cable tray installation. TG pp—13

Preliminaries: a. Prayer b. Greetings Drill/Review Demonstration/Discussion Group work/Reporting Label all the needed tools for cable bridge installation. Bring your own tools for the next activity.

Checked by:

_____________________ TLE Coordinator/MT-I

Related Documents

Dll
November 2019 55
Dll
November 2019 53
Dll
December 2019 46
Dll Cookery.docx
December 2019 41
Karp Dll
December 2019 40
Dll Tle
October 2019 52

More Documents from ""