Daftar Isi.docx

  • Uploaded by: Ahmad Yani
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Daftar Isi.docx as PDF for free.

More details

  • Words: 975
  • Pages: 6
LAPORAN KERJA PRAKTEK PT.VALE SOROWAKO PT. VALE INDONESIA

POLITEKNIK NEGERI UJUNG PANDANG ---------------------------------------------------------------------------------------------------------------------------

LEMBAR PENGESAHAN LAPORAN KERJA PRAKTEK Periode 16 Juli 2018 – 18 Agustus 2018

Setelah membaca isi Laporan Kerja Praktek yang disusun oleh : Nama

: M. Aqram Aditya U. D. / Ahmad Yani / Putri Ulfa Y.

Universitas

: Politeknik Negeri Ujung Pandang

N.I.M.

: 342 16 018 / 342 16 020 / 342 16 050

Badge Number (B/N)

: 213 – 07 – 2018 / 214 – 07 – 2018 / 215 – 07 – 2018

Judul Laporan

: Efisiensi Boiler pada Thermal Power Plant PT. Vale Indonesia, Tbk.

Maka dengan ini mengesahkan isi Laporan ini. Sorowako, 16 Agustus 2018

Mengetahui,

( Amirullah ) Thermal Instructor Utillities Departement

(Ardi ) Thermal Electrical Supervisor Utillities Departement

-----------------------------------------------------------------------------------------------------------------------------------------------------Jurusan Teknik Mesin Politeknik Negeri Ujung Pandang Page i

LAPORAN KERJA PRAKTEK PT.VALE SOROWAKO PT. VALE INDONESIA

POLITEKNIK NEGERI UJUNG PANDANG ---------------------------------------------------------------------------------------------------------------------------

KATA PENGANTAR

Puji syukur kami panjatkan ke hadirat Tuhan Yang maha kuasa atas berkat dan HikmatNya, sehingga kami dapat menyelesaikan laporan kami Laporan ini kami susun berdasarkan kegiatan kerja praktek (KP) selama 1 bulan di Utilities Departement, PT. VALE Sorowako khususnya pada Bioler yang mensuplay Steam (uap) ke pabrik. Pelaksanaan KP ini dimaksudkan untuk memperluas wawasan Mahasiswa pada dunia industri, selain itu mengikuti kurikulum yang telah ditetapkan dari perguruan tinggi bagi setiap Mahasiswa. Adapun judul laporan yang kami kemukakan yaitu tentang EFISIENSI BOILER PADA THERMAL POWER PLANT PT.VALE INDONESIA TBK yang menerangkan bagian-bagian Bioler, dan menganalisa kinerja bioler sebagai pemanasan air mengubah fasa cair menjadi fasa uap untuk disalurkan ke pabrik. Package Boiler 2 merupakan salah satu suplay steam utama untuk kebutuhan pabrik. Laporan yang kami susun berdasarkan data yang kami peroleh , baik dari pihak operator, mekanik maupun analisa perhitungan yang kami kerjakan berdasarkan buku pegangan yang ada. Oleh karena itu, kami mengharapkan masukan saran dan pertimbangan yang dapat kami jadikan bahan koreksi dan referensi untuk penyusunan laporan di masa yang akan datang. Penghargaan dan terima kasih kami haturkan kepada semua pihak atas segala dukungannya selama ini, baik yang berupa materi dan non materi sehingga laporan kami dapat terselesaikan dan satu yang pasti kami mendapatkan banyak ilmu dari beliau – beliau. Pihak pihak tersebut antara lain: 1. Bapak, Ibu dan Keluarga tersayang yang senantiasa memberikan semangat dan doa. 2. Bapak Andi Suntoro, selaku Director Departemen Maintenance & Utilities PT VALE Indonesia, Tbk. 3. Bapak Pamrih Pammu, selaku General Manager of Utilties

Thermal Maintenance

Departemen Maintenance & Utilities PT VALE Indonesia, Tbk. 4. Bapak Wisnu Haryoko, selaku Manager of Utilties Thermal Maintenance Departemen Maintenance & Utilities PT VALE Indonesia, Tbk. 5. Bapak Revly Tampi, selaku Senior Coordinator Training Departemen Maintenance & Utilities PT VALE Indonesia, Tbk. -----------------------------------------------------------------------------------------------------------------------------------------------------Jurusan Teknik Mesin Politeknik Negeri Ujung Pandang Page ii

LAPORAN KERJA PRAKTEK PT.VALE SOROWAKO PT. VALE INDONESIA

POLITEKNIK NEGERI UJUNG PANDANG ---------------------------------------------------------------------------------------------------------------------------

6. Bapak Nashir Muhammad, selaku Thermal Instrument Supervisor Departemen Maintenance & Utilities PT VALE Indonesia, Tbk. 7. Bapak Ardi/Anhar, selaku Thermal Electrical Supervisor Departemen Maintenance & Utilities PT VALE Indonesia, Tbk dan selaku pembimbing. 8. Bapak Amirullah, selaku Thermal Instructor of Thermal Power Plant Departemen Maintenance & Utilities PT VALE Indonesia, Tbk dan selaku pembimbing. 9. Bapak Daud Batara, selaku Thermal Shift Supervisor of Thermal Power Plant Departemen Maintenance & Utilities PT VALE Indonesia, Tbk. 10. Segenap karyawan Operation & Maintenance Thermal Power Plant Departemen Maintenance & Utilities PT VALE Indonesia, Tbk. 11. Teman-teman mahasiswa PNUP Fakultas Teknik Mesin yang telah memberikan dukungan.

Semoga laporan ini dapat bermanfaat bagi kami dan para pembaca untuk memperluas wawasan berpikir dan khasanah ilmu pengetahuan kita semua. Salam sejahtera.

Sorowako 16 Agustus 2018

Penyusun

-----------------------------------------------------------------------------------------------------------------------------------------------------Jurusan Teknik Mesin Politeknik Negeri Ujung Pandang Page iii

LAPORAN KERJA PRAKTEK PT.VALE SOROWAKO PT. VALE INDONESIA

POLITEKNIK NEGERI UJUNG PANDANG ---------------------------------------------------------------------------------------------------------------------------

DAFTAR ISI LEMBAR PENGESAHAN ...........................................................................................................i KATA PENGANTAR ...................................................................................................................ii DAFTAR ISI..................................................................................................................................iv BAB I PENDAHULUAN ..............................................................................................................1 1.1 Latar Belakang ..................................................................................................................1 1.2 Tujuan penulisan ...............................................................................................................1 1.3 Ruang Lingkup atau Batasan ..........................................................................................1 1.4 Waktu dan Tempat Kerja Praktek .................................................................................1 1.5 Teknik Pengumpulan data ...............................................................................................1 1.6 Sistematika penulisan........................................................................................................2 BAB II AKTIVITAS KERJA PRAKTEK ..................................................................................3 BAB III GAMBARAN UMUM PT. VALE INDONESIA, Tbk ................................................7 3.1 Gambaran Umum PT. Vale Indonesia, Tbk ...................................................................7 3.2 Sejarah Perkembangan PT. Vale Indonesia, Tbk ..........................................................8 3.3 Kontrak Area ................................................................................................................. 12 3.4 Ruang Lingkup Usaha ................................................................................................... 12 3.4.1 Proses Penambangan ......................................................................................... 12 3.4.2 Proses Pengolahan .............................................................................................. 14 3.5 Penjelasan Umum Tiap Departemen ............................................................................ 18 3.5.1 Departemen Tambang (Mining) ....................................................................... 18 3.5.2 Departemen technical Service ........................................................................... 19 3.5.3 Departemen Utilities........................................................................................... 19 3.5.4 Departemen Process Plant ................................................................................. 23 -----------------------------------------------------------------------------------------------------------------------------------------------------Jurusan Teknik Mesin Politeknik Negeri Ujung Pandang Page iv

LAPORAN KERJA PRAKTEK PT.VALE SOROWAKO PT. VALE INDONESIA

POLITEKNIK NEGERI UJUNG PANDANG ---------------------------------------------------------------------------------------------------------------------------

3.5.5 Departemen Logistik ......................................................................................... 24 3.5.6 Departemen Keselamatan Kerja, Lingkungan, Pemerintahan dan Masyarakat .............................................................................................................................. 25 3.5.7 Departement Personalia..................................................................................... 25 BAB IV LANDASAN TEORI ................................................................................................... 27 4.1.Pengertian Boiler ............................................................................................................ 27 4.2. Jenis-jenis boiler ............................................................................................................ 27 4.2.1 Jenis Boiler Berdasarkan Type Tube (Pipa) .................................................... 27 4.2.2 Berdasarkan Jenis Bahan Bakar ...................................................................... 29 4.3.Bagian Utama Boiler ...................................................................................................... 30 4.4.Efisiensi Boiler dan Faktor yang Mempengaruhi Efisiensi ........................................ 31 4.4.1 Rumus Efisiensi .................................................................................................. 31 4.4.2 Ratio Udara Pembakaran .................................................................................. 32 4.4.3 Jelaga (Boiler Soot) ............................................................................................ 33 4.4.4 Manajemen Air Umpan ..................................................................................... 34 BAB V PEMELIHARAAN BOILER ...................................................................................... 35 5.1 Data Peralatan Boiler ..................................................................................................... 35 5.2 Pemeliharaan Package Boiler 2 ..................................................................................... 38 5.3 Proses Pengoprasian Package Boiler 2 ........................................................................ 39 5.4 Sistem Kelistrikan Package Boiler 2 ............................................................................ 40 5.5 K3 dalam Pengoprasian Boiler ...................................................................................... 41 5.6 Menghitung Efisiensi ...................................................................................................... 42 5.6.1 Menghitung Efisiensi Secara Teoritis ............................................................... 42 5.6.2 Menghitung Efisiensi Secara Aktual................................................................. 42 -----------------------------------------------------------------------------------------------------------------------------------------------------Jurusan Teknik Mesin Politeknik Negeri Ujung Pandang Page v

LAPORAN KERJA PRAKTEK PT.VALE SOROWAKO PT. VALE INDONESIA

POLITEKNIK NEGERI UJUNG PANDANG ---------------------------------------------------------------------------------------------------------------------------

5.6.3 Tabel dan Grafik ................................................................................................ 43

BAB VI PENUTUP .................................................................................................................... 45 6.1. Kesimpulan........................................................................................................................ 45 6.2. Saran ................................................................................................................................. 45

DAFTAR PUSTAKA ................................................................................................................ 46 SURAT KETERANGAN ........................................................................................................... 47 LEMBAR PENILAIAN ............................................................................................................. 48

-----------------------------------------------------------------------------------------------------------------------------------------------------Jurusan Teknik Mesin Politeknik Negeri Ujung Pandang Page vi

Related Documents


More Documents from "oliviafabita"