DAFTAR GAMBAR
Gambar 2.1 Sejarah PT Surya borneo industri………………………………...5 Gambar 2.2 Profil PT Surya borneo industri…………………………………..5 Gambar 2.3 visi PT surya borneo industri……………………………………..6 Gambar 2.4 Lokasi PT surya borneo industri………………………………….7 Gambar 3 1 Weight Bridge (Jembatan Timbang) PT SBI………………………9 Gambar 3 2 Indikator Jembatan Timbang………………...……………………10 Gambar 3 3 Sensor Strain Gauge. ……………………………………………..11 Gambar 3 4 Loadcell Jembatan Timbang ……………………………………...11 Gambar 3 5 konstruksi twin module pitlles weight bridge …………………….12 Gambar 3 6 Sistem Software pada Jembatan Timbang………………………...13 Gambar 3 7 Kamera Jembatan Timbang ………………………………………13 Gambar 3 8 Skema Alur Pada Jembatan Timbang ……………………………14 Gambar 3 9 Unloading CPO sementara dan Storage Tank…………………....15 Gambar 3 10 Rifinery Plant PT SBI …………………………………………..16 Gambar 3 11 Bleaching Earth ………………………………………………...17 Gambar 3 12 Phosphoric Acid ………………………………………...……....17 Gambar 3 13 Pompa Diafragma PT SBI……………………………………....18 Gambar 3 14 Pompa Diafragma Udara………………………………………..19 Gambar 3 15 Pompa Diafragma Udara ……………………………………….20 Gambar 3 16 Pompa Diafragma Penggerak Motor……………………………20 Gambar 3 17 Pompa Diafragma Selenoid……………………………………..21 Gambar 3 18 Cara Kerja Pompa Diafragma…………………………………...21 Gambar 3 19 Pompa PU 301…………………………………………………..23 Gambar 3 20 Heat Exchanger 311 dan 312…………………………………....23 Gambar 3 21 Mixer 312………………………………………………………..24
VII
Gambar 3 22 Bleaching Vessel…………………………………………………24 Gambar 3 23 Niagara Filter…………………………………………………….25 Gambar 3 24 HE 722…………………………………………………………...25 Gambar 3 25 Pre Stripper……………………………………………………...26 Gambar 3 26 Deodorizer………………………………………………………26 Gambar 3 27 Hasil RBDPO……………………………………………………27 Gambar 3 28 Pompa Sentrifugal……………………………………………….27 Gambar 3 29 Bagian Rumah Pompa Sentrifugal………………………………29 Gambar 3 30 Stuffing Box Pada Pompa Sentrifugal……………………………29 Gambar 3 31 packing Pada Pompa Sentrifugal………………………………...30 Gambar 3 32 Shaft Sleeve Pada Pompa Sentrifugal…………………………....30 Gambar 3 33 Shaft Pada Pompa Sentrifugal…………………………………....30 Gambar 3 34 Vane Pada Pompa Sentrifugal……………………………………31 Gambar 3 35 Casing Pompa Sentrifugal………………………………………..31 Gambar 3 36 eye of impeller……………………………………………………32 Gambar 3 37 impller pada pompa sentrifugal…………………………………..32 Gambar 3 38 wearing ring pompa sentrifugal…………………………………..33 Gambar 3 39 Bearing pada pompa sentrifugal………………………………….33 Gambar 3 40 Perpindahan Kalor Heat Exhanger……………………………….34 Gambar 3 41 Shell and tube heat exchanger……………………………………37 Gambar 3 42 Fixed Tube Sheet atau Fixed Head (Type L, M, atau N)………...38 Gambar 3 43 U-Tube Heat Exchanger (Shely Dian, 2010)…………………….38 Gambar 3 44 Packed-Lantern-Ring Exchanger (Shely Dian, 2010)……………39 Gambar 3 45 Outside-Packed-Floating Heat Exchanger (Shely Dian, 2010)….40 Gambar 3 46 Alat penukar kalor jenis Double Pipa (Ike Yulia, 2011)………….41 Gambar 3 47 Pipa Coil Heat Exchanger (Anonim, 2012)………………………42 Gambar 3 48 Alat penukar kalor jenis open tube section (Anonim, 2010)……...43
VIII
Gambar 3 49 Penukar panas jenis pelat and Frame (Stevano Viktor, 2011)……44 Gambar 3 50 Plate Heat Exchanger (Stevano Viktor, 2011)……………………45 Gambar 3 51 Tipe pelat (Stevano Viktor, 2011)………………………………...45 Gambar 3 52 Pelat penyangga tetap (fixed frame) (Stevano Viktor, 2011………46 Gambar 3 53 Compression Bolt…………………………………………………..46 Gambar 3 54 Guide Bars…………………………………………………………46 Gambar 3 55 pillow plate heat exchanger………………………………………..47 Gambar 3 56 Dynamic scraped surface heat exchanger (Anonim, 2010)………48 Gambar 3 57 Phase-change heat exchanger (Zuhrina, 2006)…………………...49 Gambar 3 58 Boiler………………………………………………………………50 Gambar 3 59 Genset 200kVa…………………………………………………….50
IX
DAFTAR SINGKATAN DAN NAMA
Singkatan
Nama
SBI
Surya Borneo Industri
CPO
Crude Palm Oi
PA
Phosphoric Acid
BE
Bleaching Earth
PHE
Plate Heat Exchanger
DBPO
Degummed Bleached Palm Oil
RBDPO
Refined Bleached Deodorized Palm Oil
PFAD
Palm Fatty Acid Distillate
FFA
Free Fatty Acid
PK
Palm Kernel
CPKO
Crude Palm Kernel Oil
WB
Weight Bridge
BOD
Biochemical Oxygen Demand
COD
Chemical Oxygen Demand
HRD
Human Resource Division
SOP
Standard Operational Procedure
HE
Heat Exchanger
PKL
Praktek Kerja Lapangan
X
XI