INFORMASI UMUM No.

U RAIAN

1.

I N F O R MAS I

No. Paket Kontrak

: 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah

Satker / PPK

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

2.

Nama Paket

: PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

3.

Prop / Kab / Kodya

: Sumatera Barat

Lokasi

:

4.

Lokasi pekerjaan

Periksa lampiran

5.

Kondisi jalan lama

..............................

6.

Panjang efektif

( lihat sketsa di bawah )

7.

Lebar jalan lama

( bahu + perkerasan + bahu )

( 1.50

+ 7.00

+ 1.50

)

8.

Lebar Rencana

( bahu + perkerasan + bahu )

( 1.50

+ 7.00

+ 1.50

)

9.

Penampang jalan, jenis dan volume pekerjaan pokok

10.

Jangka waktu pelaksanaan pekerjaan

270 hari kalender Atau : 9.00 bulan (Periode Pelaksanaan)

11.

Jarak rata-rata Base Camp ke lokasi pekerjaan --->

L=

Perhitungan didasarkan pada sketsa di bawah ini :

L = { (c+a/2)*a + (c+b/2)*b } / (a+b)

30.00 Km = a A

60.00 Kilometer ( Leff = a + b )

Lihat lampiran.

70.00 Kilometer

30.00 Km = b 3.0 Km = c

B

Base Camp ---------> Kalkulasi Jarak Rata-Rata =

12. 13. 14. 15.

Jam kerja efektif dalam 1 hari Asuransi, Pajak, dsb. untuk Peralatan Tingkat Suku Bunga Investasi Alat Biaya Umum dan Keuntungan C

7.0 0.002 10.00 10.00

jam x Harga Pokok Alat % % x Biaya Langsung

C 16.

RINGKASAN METODE PELAKSANAAN

a.

Mobilisasi dilaksanakan sesuai ketentuan yang berlaku dalam Kontrak. D Pekerjaan Tanah dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................................................................... Pekerjaan Lapis Pondasi Agregat dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................................................................... Pekerjaan Campuran Aspal Panas dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................................................................... Pekerjaan Pasangan Batu dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................................................................... Pekerjaan Pengembalian Kondisi dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................................................................... ........................................................................... ...........................................................................

b. c. d. e. f. g.

17.

Lokasi Quarry

Periksa lampiran.

18

Jumlah Jembatan = ...................... Buah

Periksa lampiran.

19

Total Bentang Jembatan = .................. Buah

Periksa lampiran.

20

....................................

21

....................................

22

....................................

UM

SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAY I N F O R MAS I

awah - Bts. Sumut (Padang Sawah)

ah - Bts. Sumut (Padang Sawah) PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT PADANG SAWAH – BTS. SUMUT

............... ( Leff = a + b ) meter meter

riode Pelaksanaan)

)*b } / (a+b)

........... ............ ............. ............

.............

ALAN NASIONAL WILAYAH I PROVINSI SUMATERA BARAT

###

REKAPITULASI PERKIRAAN HARGA PEKERJAAN Satker / PPK No. Paket Kontrak

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

Nama Paket

: PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

Prop / Kab / Kodya

Lingkup Pekerjaan ( Rp ) No. Divisi

Uraian

Pemeliharaan Rutin Harga per - Divisi

1 2 3 4 5 6 7 8 8a 9 10 10.a 10.b

Umum Drainase Pekerjaan Tanah Pelebaran Perkerasan dan Bahu Jalan Pekerasan Berbutir Perkerasan Aspal Struktur Pengembalian Kondisi dan Pekerjaan Minor Pengembalian Kondisi dan Pekerjaan Minor untuk Pekerjaan Penunjang Pekerjaan Harian Pekerjaan Pemeliharaan Rutin Spesifikasi Khusus Pemeliharaan Rutin Jalan Spesifikasi Khusus Pemeliharaan Rutin Jembatan

a

Harga Konstruksi

b

Total Harga Konstruksi ( T = A + B + C + D )

c

Bobot Tertimbang = ( a/b) x 100 %

d

Pajak Pertambahan Nilai (Ppn) = 10% x T

e

Total Harga + PPN = b + d

DIBULATKAN

Terbilang :

Err:509

Bobot %

Pemeliharaan Rutin Kondisi Harga per - Divisi

Err:509 Err:509 10,001,427.40 Err:509 13,535,064.60 Err:509 Err:509 Err:509 Err:509 229,549,953.29 Err:509 Err:509

Err:509

Err:509

46,399,953.58 Err:509 Err:509 4,309,429,247.68 Err:509

Bobot %

Rekonstruksi Jalan Harga per - Divisi

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 31,211,841.00 Err:509 Err:509 Err:509 Err:509 Err:509 -

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

REKAPITULASI

RAAN HARGA PEKERJAAN

Lingkup Pekerjaan ( Rp ) Rekonstruksi Jalan Bobot %

Pemel. Rutin Jembatan Harga per - Divisi

Bobot %

Jumlah

Bobot

Harga (Rupiah)

Harga (%)

Err:509 443,429,040.00 Err:509 510,576,960.34 Err:509 41,841,390.99 Err:509 14,676,486.11 Err:509 Err:509 3,821,898,371.81 Err:509 270,714,353.66 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509

Err:509

Err:509 252,831,461.52 . Err:509 Err:509 Err:509 Err:509 Err:509 5,236,406,529.09

Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509

Err:509 Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509

Padang, 19 Januari 2017 Penawar, NABIL - SURYADO KSO

ALI AZWAR Representative KSO

###

REKAPITULASI PERKIRAAN HARGA PEKERJAAN Satker / PPK No. Paket Kontrak

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

Nama Paket

: PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

Prop / Kab / Kodya

Uraian

No. Divisi

1

Umum

2

Drainase

3

Pekerjaan Tanah

4

Pelebaran Perkerasan dan Bahu Jalan

5

Pekerasan Berbutir

6

Perkerasan Aspal

7

Struktur

8

Pengembalian Kondisi dan Pekerjaan Minor

9

Pekerjaan Harian

10

Pekerjaan Pemeliharaan Rutin

(A)

Jumlah Harga Pekerjaan (termasuk Biaya Umum dan Keuntungan)

(B)

Pajak Pertambahan Nilai (PPN) = 10% x (A)

(C)

Jumlah Total Harga Pekerjaan = (A) + (B)

(D)

Dibulatkan

Terbilang :

.

#NAME?

Padang, 06 Februari 2019 Pelaksana,

PT. PRIMA MARINDO NUSANTAR

DESRIANTO, ST Direktur Utama

REKAPITULASI

PERKIRAAN HARGA PEKERJAAN

ADANG SAWAH – BTS. SUMUT

Jumlah Harga (Rupiah) 443,429,040.00 500,575,532.93 28,306,326.39 310,986,884.75 3,821,898,371.81 41,164,400.37 Err:509 175,219,666.93 215,142,735.97 Err:509 Err:509 Err:509

Err:509

Padang, 06 Februari 2019 PT. PRIMA MARINDO NUSANTARA

DESRIANTO, ST Direktur Utama

PT. CITRA PERMATA SULUNG General Contractor and Supply

Email : [email protected]

JL. Tamiang Saroha Nagari Ujung Gading Lembah Melintang Kab. Pasaman Barat

Nomor : 02/SPH-CPS/II/2019 Lampiran : 1 Berkas Penawaran

Padang, 11 Februari 2019

Kepada Yth: Kelompok Kerja (POKJA) Pemilihan 7 Bina Marga di Jalan Khatib Sulaiman No. 9 Padang Perihal

: Penawaran PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

Sehubungan dengan pengumuman tender Pascakualifikasi dan Dokumen Pemilihan/Addendum nomor: ADD-2-POKJA-PJN-ISUMBAR/02.01 tanggal 6 Februari 2019 dan Setelah kami pelajari dengan saksama Dokumen Pemilihan dan Berita Acara Pemberian Penjelasan [serta adendum Dokumen Pemilihan], dengan ini kami mengajukan penawaran untuk pekerjaan Preservasi Jalan Padang Sawah - Bts. Sumut sebesar (termasuk Ppn ) : Rp.

Dua Belas Milyar Dua Ratus Tujuh Belas Juta Lima Ratus Enam Puluh Sembilan Ribu 12,217,569,900.00 : Sembilan Ratus Rupiah

Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen Pemilihan untuk melaksanakan pekerjaan tersebut. Penawaran ini berlaku selama 90 (Sembilan Puluh) hari kalender sejak batas akhir pemasukan penawaran , yaitu dari tanggal 11 Februari 2019 s.d 12 Mei 2019 Sesuai dengan persyaratan, bersama Surat Penawaran ini kami lampirkan : 1. Jaminan Penawaran 2. Dokumen Penawaran teknis, terdiri atas: a. Metoda Pelaksanaan; b. Jangka waktu pelaksanaan pekerjaan; c. Daftar isian Peralatan utama; d. Daftar isian Personel manajerial beserta surat pernyataan kepemilikan sertifikat kompetensi kerja e. Rencana Keselamatan Konstruksi (RKK) f. Daftar isian bagian pekerjaan yang akan disubkontrakkan (apabila disyaratkan); dan g Dokumen lain yang disyaratkan (apabila ada). 4. Dokumen Penawaran Harga terdiri atas a. Daftar Kuantitas dan Harga; 5. Dokumen Kualifikasi. a. Formulir rekapitulasi perhitungan Tingkat Komponen Dalam Negeri (TKDN), (apabila memenuhi syarat untuk diberikan preferensi harga); dan b. Daftar barang yang diimpor (apabila ada) Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada semua ketentuan yang tercantum dalam Dokumen Pemilihan serta Pokja Pemilihan tidak terikat untuk menetapkan penawaran terendah sebagai pemenang. Apabila dana dalam dokumen anggaran yang telah disahkan tidak tersedia atau tidak cukup tersedia dalam DIPA/DPA Tahun Anggaran, maka Pengadaan Barang/Jasa dapat dibatalkan dan kami tidak akan menuntut ganti rugi dalam bentuk apapun Penawar PT. CITRA PERMATA SULUNG

FARDI MUBAROK Direktur Utama

RINGKASAN TARGET PANJANG DAN TOTAL HARGA Paket Pekerjaan

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

No. Paket

: 02

Ruas Jalan

: Padang Sawah - Bts. Sumut (Bedeng Rapat)

Nama Penyedia

: PT. CITRA PERMATA SULUNG

NO. PAKET

LINGKUP PEKERJAAN

1

PRESERVASI REKONSTRUKSI / REHABILITASI JALAN

2

PRESERVASI PEMELIHARAAN RUTIN JALAN

3 4

PANJANG (M¹)

TOTAL HARGA

BOBOT

2,800.00

6,106,539,389.80

49.98

132,500.00

4,791,412,121.38

39.22

PRESERVASI JEMBATAN

147.40

536,600,396.74

4.39

PRESERVASI RUTIN JEMBATAN

954.90

783,017,999.98

6.41

12,217,569,907.90

100.00

JUMLAH AHRGA PEKERJAAN DIBULATKAN

12,217,569,900.00

Dua Belas Milyar Dua Ratus Tujuh Belas Juta Lima Ratus Enam Puluh Sembilan Ribu Sembilan Ratus Rupiah

Padang , 11 Februari 2019 Penawar, PT. CITRA PERMATA SULUNG

ttd

FARDI MUBAROK Direktur Utama

KET

REKAPITULASI DAFTAR KUANTITAS DAN HARGA Paket Pekerjaan

PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

No. Paket

02

Ruas Jalan

Padang Sawah - Bts. Sumut (Bedeng Rapat)

Nama Penyedia

PT. CITRA PERMATA SULUNG LINGKUP PEKERJAAN

NO. DIVISI

URAIAN PEKERJAAN

(a)

(b)

PRESERVASI REKONSTRUKSI /REHABILITASI JALAN

PRESERVASI PEMELIHARAAN RUTIN JALAN

Harga Per - Divisi (Rp)

Bobot (%)

Harga Per - Divisi (Rp)

Bobot (%)

(c)

(d)

(e)

(f)

PRESERVASI JEMBATAN

Harga Per - Divisi Harga Per - Divisi Bobot (%) (Rupiah) (Rupiah) (g)

(h)

I

UMUM

443,429,040.00

7.99

500,575,532.93

9.02

10,001,427.40

28,306,326.39

0.51

13,535,064.60

II

DRAINASE

III

PEKERJAAN TANAH DAN GEOSINTETIK

IV

PEKERJAAN PREVENTIF

V

PERK. BERBUTIR DAN PERKERASAN BETON SEMEN

VI

PERKERASAN ASPAL

VII

STRUKTUR

VIII

REHABILITASI JEMBATAN

IX

PEKERJAAN HARIAN DAN DAN PEKERJAAN LAIN - LAIN

X

PEKERJAAN PEMELIHARAAN KINERJA

a

Harga Konstruksi

b

Total Haraga Konstruksi ( T =C + E + G + I )

c

Bobot Tertimbang (a/b) x 100%

PRESERVASI RUTIN JEMBATAN

(i)

JUMLAH HARGA (Rupiah)

BOBOT HARGA (%)

(k)

(m)

Bobot (%) (j)

443,429,040.00

3.99

2.05

510,576,960.34

4.60

2.77

41,841,390.99

0.38

14,676,486.11

0.26

14,676,486.11

0.13

310,986,884.75

5.60

310,986,884.75

2.80

3,821,898,371.81

68.85

41,164,400.37

0.74

175,219,666.93

3.16

46,399,953.58

215,142,735.97

3.88

4,309,429,247.68

98.93

5,551,399,445.28

100.00

4,355,829,201.26

100.00

1.07

3,821,898,371.81

34.41

229,549,953.29

47.06

270,714,353.66

2.44

203,520,256.19

41.72

203,520,256.19

1.83

31,211,841.00

6.40

252,831,461.52

2.28

487,818,542.49

100.00

711,834,545.44

100.0

5,236,406,529.09

47.15

711,834,545.44

100.0

11,106,881,734.46

100.00

11,106,881,734.46 50%

39%

4%

6%

100%

d

Pajak Pertambahan Nilai (PPN) = 10% x T

555,139,944.53

435,582,920.13

48,781,854.25

71,183,454.54

1,110,688,173.45

e

Total Harga + PPN = b + d

6,106,539,389.80

4,791,412,121.38

536,600,396.74

783,017,999.98

12,217,569,907.90

f

Dibulatkan

6,106,539,300.00

4,791,412,100.00

536,600,300.00

783,017,900.00

12,217,569,900.00

Padang , 11 Februari 2019 Penawar, PT. CITRA PERMATA SULUNG

FARDI MUBAROK Direktur Utama

TIME SCHEDULE Satker / PPK No. Paket Kontrak Nama Paket Prop / Kab / Kodya MATA PEMBA YARAN UTAMA

1.2 1.8.(1) 1.19 2.1.(1) 2.2.(1) 3.1.(1a) 3.2.(2a) 4.4.(2) 5.1.(3) 6.1 (2)(a) 6.3(5a) 6.3(6a) 6.3.(8) 7.1 (7) a 7.3 (1) 7.9.(1) 9.1.(1) 9.1.(2) 9.1.(3) 9.1.(4) a 9.1.(9) 9.1.(11) 9.2(1) 10.1(1) 10.1(4) 10.1(9) 10.1(20) 10.1(21) 10.1(22)

URAIAN

STN

DIVISI 1. UMUM Mobilisasi LS Manajemen dan Keselamatan Lalu Lintas LS Keselamatan dan Kesehatan Kerja LS DIVISI 2. DRAINASE Galian untuk Selokan Drainase dan Saluran Air M3 Pasangan Batu dengan Mortar M3 DIVISI 3. PEKERJAAN TANAH Galian Biasa M3 Timbunan Pilihan dari sumber galian M3 DIVISI 4. PEKERJAAN PREVENTIF Penghamparan lapis penutup bubur aspal emulsi, tipe 1, CQS-1h M² DIVISI 5. PEK. BERBUTIR DAN PERKERASAN BETON SEMEN Lapis Pondasi Agregat Kelas S DIVISI 6. PERKERASAN ASPAL Lapis Perekat - Aspal Cair Liter Laston Lapis Aus (AC-WC) Ton Laston Lapis Antara (AC-BC) Ton Bahan anti pengelupasan Kg DIVISI 7. STRUKTUR Beton mutu sedang fc’20 MPa M3 Baja Tulangan Polos BjTP 280 Kg Pasangan Batu M3 DIVISI 9. PEKERJAAN HARIAN Mandor Jam Pekerja Biasa Jam Tukang Kayu, Tukang Batu, dsb Jam Dump Truck, kapasitas 3 - 4 m³ Jam Loader Roda Karet 1.0 - 1.6 M3 Jam Alat Penggali (Excavator) 80 - 140 PK Jam Marka Jalan Termoplastik M2 DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA Galian Tanah untuk saluran air dan lereng M3 Lapis Pondasi Aggregat Klas A M3 Campuran Aspal Panas M3 Pembersihan Rambu Bh M¹ Pembersihan Drainase M² Pengendalian Tanaman pada Rumija

HARGA SATUAN (RUPIAH)

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

VOLUME

JUMLAH HARGA

WAKTU PELAKSANAAN MINGGU KE

BOBOT 1

233,949,040.00 30,980,000.00 178,500,000.00

1.00 1.00 1.00

233,949,040.00 30,980,000.00 178,500,000.00

4.21 0.56 3.22

41,080.75 632,042.91

1,200.00 714.00

49,296,894.39 451,278,638.55

0.89 8.13

37,671.06 137,571.67 20,700.26

588.24 44.68

22,159,624.33 6,146,702.06

0.40 0.11

709.00

14,676,486.11

0.26

364,251.36

853.77

310,986,884.75

5.60

12,696.37 1,282,164.67 1,230,164.84 65,000.00 1,495,768.69 15,453.26 688,665.98 19,040.48 13,860.00 15,897.62 304,898.21 340,919.51 573,619.51 175,253.43 37,671.06 561,605.73 2,832,808.30 59,992.54 1,741.49 651.81

5,715.00 1,471.30 1,495.53 356.02

72,559,773.66 1,886,448,880.10 1,839,748,418.06 23,141,300.00

1.31 33.98 33.14 0.42

6.16 677.59 31.19

9,213,935.13 10,470,973.31 21,479,491.93

0.17 0.19 0.39

28.00 112.00 56.00 28.00 28.00 28.00 788.00

533,133.44 1,552,320.00 890,266.72 8,537,149.94 9,545,746.36 16,061,346.40 138,099,704.07

0.01 0.03 0.02 0.15 0.17 0.29 2.49

381.87 74.85 43.65 5.00 1,700.00 48,800.00

14,385,448.71 42,036,188.82 123,652,082.08 299,962.71 2,960,530.45 31,808,523.20

0.26 0.76 2.23 0.01 0.05 0.57

JUMLAH 5,551,399,445.28 RENCANA BOBOT / MINGGU AKUMULATIF BOBOT / MIMGGU REALISASI BOBOT / MINGGU AKUMULATIF BOBOT / MIMGGU DEVIACE +/ -

100.00

0.5268

7 0.53 0.53

2

3

4

5

6

8

-

9

10

11

12

14

15

16

17

18

19

20

0.527

0.527

1.580

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.0871

0.0871

0.0871

0.0871

0.0871

0.0871

0.0871

0.0871

0.0871

0.0871

2.2654

2.2654

2.2654

2.2654

2.2654

2.2654

2.2654

2.2654

2.2654

2.2654

2.2094

2.2094

2.2094

2.2094

2.2094

2.2094

2.2094

2.2094

2.2094

2.2094

0.0278

0.0278

0.0278

0.0278

0.0278

0.0278

0.0278

0.0278

0.0278

0.0278

0.1110

0.1110

0.1110

0.1110

0.1110

0.1110

0.1110

0.1110

1.0161

1.0161

1.0161

1.0161

1.0161

1.0161

1.0161

1.0161

0.0499

0.0499

0.0499

0.0499

0.0499

0.0499

0.0499

0.0499

0.0138

0.0138

0.0138

0.0138

0.0138

0.0138

0.0138

0.0138

0.1322

0.1322

21 1.85 3.04

0.08

0.08

0.09

0.09

0.19

0.19

28 1.70 4.74

35 1.70 6.43

-

13

0.527

14 0.66 1.19

-

7

-

0.0005

0.0005

0.0005

0.0005

0.0005

0.0005

0.0005

0.0005

0.0005

0.0005

0.0005

0.0005

0.0005

0.0014

0.0014

0.0014

0.0014

0.0014

0.0014

0.0014

0.0014

0.0014

0.0014

0.0014

0.0014

0.0014

0.0008

0.0008

0.0008

0.0008

0.0008

0.0008

0.0008

0.0008

0.0008

0.0008

0.0008

0.0008

0.0008

0.0077

0.0077

0.0077

0.0077

0.0077

0.0077

0.0077

0.0077

0.0077

0.0077

0.0077

0.0077

0.0077

0.0086

0.0086

0.0086

0.0086

0.0086

0.0086

0.0086

0.0086

0.0086

0.0086

0.0086

0.0086

0.0086

0.0145

0.0145

0.0145

0.0145

0.0145

0.0145

0.0145

0.0145

0.0145

0.0145

0.0145

0.0145

0.0145

0.1244

0.1244

0.1244

0.1244

0.1244

0.1244

0.1244

0.1244

0.1244

0.1244

0.1244

0.1244

0.1244

70 3.06 19.78

77 4.88 24.66

84 4.88 29.55

91 4.88 34.43

98 4.88 39.31

105 4.88 44.19

112 4.88 49.08

119 4.88 53.96

126 4.88 58.84

133 4.88 63.72

140 4.88 68.61

0.06

0.06

0.06

0.06

0.19

0.19

0.19

0.19

0.56

0.56

0.56

0.56

0.00

0.00

0.00

0.00

0.01

0.01

0.01

0.01

0.14

0.14

0.14

0.14

42 2.29 8.73

49 2.29 11.02

56 2.58 13.61

63 3.11 16.72

CHEDULE

WAKTU PELAKSANAAN MINGGU KE

KET 21

22

23

24

25

26

27

28

29

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.020

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.115

0.700

0.700

0.700

0.700

0.700

0.700

0.700

0.700

0.0871

0.0871

0.0871

0.0871

0.0871

2.2654

2.2654

2.2654

2.2654

2.2654

2.2094

2.2094

2.2094

2.2094

2.2094

0.0278

0.0278

0.0278

0.0278

0.0278

0.0005

0.0005

0.0005

0.0005

0.0005

0.0005

0.0005

0.0014

0.0014

0.0014

0.0014

0.0014

0.0014

0.0014

0.0008

0.0008

0.0008

0.0008

0.0008

0.0008

0.0008

0.0077

0.0077

0.0077

0.0077

0.0077

0.0077

0.0077

0.0086

0.0086

0.0086

0.0086

0.0086

0.0086

0.0086

0.0145

0.0145

0.0145

0.0145

0.0145

0.0145

0.0145

0.1244

0.1244

0.1244

0.1244

0.1244

0.1244

0.1244

147 4.88 73.49

154 5.58 79.07

161 5.58 84.65

168 5.58 90.24

175 5.58 95.82

182 0.99 96.81

189 0.99 97.80

196 0.84 98.64

203 0.84 99.47

30

0.527

210 0.53 100.0

Padang , 11 Februari 2019 Penawar, PT. CITRA PERMATA SULUNG

FARDI MUBARA Direktur Utama

TIME SCHEDULE PRESERVASI PEMELIHARAAN RUTIN JALAN Paket Pekerjaan

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

No. Paket

: 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

Ruas Jalan

: PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

Prop / Kab / Kodya

: Sumatera Barat

WAKTU PELAKSANAAN = 300 HARI KELENDER

MATA PEMBA

URAIAN

YARAN UTAMA

STN

HARGA SATUAN (RUPIAH)

VOLUME

JUMLAH

MINGGU KE

BOBOT 1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

DIVISI 9. PEKERJAAN HARIAN 9.1.(1)

Mandor

Jam

19,040.48

35.00

666,416.80

0.02

0.003

0.003

0.003

9.1.(2)

Pekerja Biasa

Jam

13,860.00

140.00

1,940,400.00

0.04

0.009

0.009

0.009

9.1.(3)

Tukang Kayu, Tukang Batu, dsb

Jam

15,897.62

70.00

1,112,833.40

0.03

0.005

0.005

0.005

9.1.(4) a

Dump Truck, kapasitas 3 - 4 m³

Jam

304,898.21

35.00

10,671,437.42

0.24

0.049

0.049

0.049

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Jam

340,919.51

35.00

11,932,182.95

0.27

0.055

0.055

0.055

9.1.(11)

Alat Penggali (Excavator) 80 - 140 PK

Jam

573,619.51

35.00

20,076,683.01

0.46

0.092

0.092

0.092

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA

-

10.1(1)

Galian Tanah untuk saluran air dan lereng

M3

37,671.06

2,816.04

106,083,219.37

2.44

10.1(2)

Timbunan Pilihan untuk lereng tepi saluran

M3

137,571.67

238.30

32,783,328.11

0.75

10.1(3)

Pasangan Batu dengan Mortar

M3

632,042.91

120.72

76,300,220.23

1.75

10.1(4)

Lapis Pondasi Aggregat Klas A

M3

561,605.73

756.68

424,955,823.09

9.76

10.1(6)

Lapis Pondasi Aggregat Klas S

M3

364,251.36

514.49

187,403,682.88

4.30

10.1(9)

Campuran Aspal Panas

M3

2,832,808.30

527.70

1,494,872,937.36

34.32

10.1(16)

Pasangan Batu

M3

688,665.98

87.20

60,051,673.48

1.38

10.1(18)

Perbaikan Rel Pengaman



76,435.51

1,000.00

76,435,510.50

1.75

0.44

0.44

0.44

0.44

10.1(19)

Pembersihan Patok

Bh

41,331.88

131.00

5,414,476.15

0.12

0.03

0.03

0.03

0.03

10.1(20)

Pembersihan Rambu

Bh

59,992.54

157.00

9,418,828.94

0.22

0.05

0.05

0.05

0.05

10.1(21)

Pembersihan Drainase



1,741.49

80,325.00

139,885,063.76

3.21

0.40

0.40

0.40

0.40

0.40

0.40

0.40

10.1(22)

Pengendalian Tanaman pada Rumija



651.81

2,601,700.00

1,695,824,483.80

38.93

1.62

1.62

1.62

1.62

1.62

1.62

1.62

0.41

0.41

0.41

0.41

0.41

0.41 0.75

0.44

0.44

0.44

0.44

3.43 0.69

0.98

0.98

0.98

0.98

0.98

0.98

0.98

0.98

0.98

3.43

3.43

3.43

3.43

3.43

3.43

3.43

3.43

3.43

0.98

0.69

JUMLAH

4,355,829,201.26

100.00

7

14

21

28

35

42

49

56

63

70

77

84

91

98

105

112

119

126

133

140

147

154

161

168

175

RENCANA BOBOT / MINGGU

0.21

0.41

0.41

0.84

0.84

0.84

1.53

1.66

3.43

4.41

4.41

4.41

4.41

4.41

4.41

4.41

4.41

4.41

3.52

2.55

2.55

2.76

2.02

2.02

2.02

AKUMULATIF BOBOT / MIMGGU

0.21

0.62

1.02

1.87

2.71

3.56

5.09

6.74

10.18

14.58

18.99

23.40

27.81

32.21

36.62

41.03

45.44

49.84

53.37

55.91

58.46

61.22

63.25

65.27

67.29

REALISASI BOBOT / MINGGU AKUMULATIF BOBOT / MIMGGU DEVIACE +/ -

SCHEDULE

ELIHARAAN RUTIN JALAN

WAKTU PELAKSANAAN = 300 HARI KELENDER MINGGU KE

KET 26

27

28

29

30

31

32

33

34

35

36

37

38

1.08

1.08

1.08

1.08

39

40

41

42

43

0.006 0.018 0.010 0.098 0.110 0.184

-

-

-

-

-

-

-

-

-

-

-

0.40

-

-

-

-

1.62

1.62

1.62

1.62

1.62

1.62

1.62

1.62

1.62

1.62

1.62

1.62

1.62

1.62

1.62

1.62

1.62

182

189

196

203

210

217

224

231

238

245

252

259

266

273

280

287

294

300

2.02

1.62

1.62

1.62

1.62

1.62

1.62

1.62

2.05

2.70

2.70

2.70

2.70

1.62

1.62

1.62

1.62

-

69.32

70.94

72.56

74.18

75.81

77.43

79.05

80.67

82.72

85.42

88.12

90.81

93.51

95.13

96.76

98.38

100.0

Padang , 11 Februari 2019 Penawar,

100.0

PT. CITRA PERMATA SULUNG

ttd

FARDI MUBAROK Direktur Utama

TIME SCHEDULE PRESERVASI JEMBATAN Paket Pekerjaan

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

No. Paket

: 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

Ruas Jalan

: PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

Prop / Kab / Kodya

: Sumatera Barat

WAKTU PELAKSANAAN 210 HARI KELENDER

MATA PEMBA

URAIAN

YARAN UTAMA

HARGA SATUAN (RUPIAH)

STN

VOLUME

DIVISI 2. DRAINASE

-

2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M

3

2.2.(1)

Pasangan Batu dengan Mortar

M

3

JUMLAH HARGA

MINGGU KE

BOBOT 1

2

3

4

5

6

7

0.01

0.01

0.01

0.01

0.01

0.01

0.01 0.32

9.60

394,375.16

0.08

632,042.91

15.20

9,607,052.25

1.92

0.32

0.32

0.32

0.32

0.32

0.00

0.00

0.00

0.00

0.00

-

10

11

12

13

14

15

16

Galian Biasa

M3

37,671.06

2.88

108,492.65

0.02

3.1.(9).

Galian Perkerasan Berbutir

M

3

205,544.20

59.28

12,184,660.20

2.43

0.61

0.61

0.61

0.61

3.2.(1a)

Timbunan Biasa dari sumber galian

M

3

71,374.24

17.40

1,241,911.75

0.25

0.06

0.06

0.06

0.06

Beton mutu sedang fc’20 MPa

M3

1,495,768.69

9.79

14,643,575.48

2.93

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

0.29

7.1 (8)

Beton mutu rendah fc’15 MPa

M

3

1,031,827.52

62.07

64,045,534.18

12.80

1.28

1.28

1.28

1.28

1.28

1.28

1.28

1.28

1.28

1.28

7.4 (1) a

Penyediaan Baja Struktur Grade 250 (Kuat Leleh 250 MPa)

Kg

16,848.84

59.97

1,010,425.07

0.20

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

7.4 (2) a

Pemasangan Baja Struktur

Kg

956.84

59.97

57,381.65

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Pasangan Batu

M3

688,665.98

59.86

41,223,545.58

8.24

0.82

0.82

0.82

0.82

0.82

0.82

0.82

0.82

0.82

0.82

M

3

594,916.67

155.17

92,313,219.17

18.44

1.84

1.84

1.84

1.84

1.84

1.84

1.84

1.84

1.84

1.84

1

619,359.42

18.00

11,148,469.61

2.23

0.22

0.22

0.22

0.22

0.22

0.22

0.22

0.22

0.22

0.22

354,708.51

14.40

5,107,802.56

1.02

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

7.10.(3) a. Bronjong dengan kawat yang dilapisi galvanis

18

19

-

7.1 (7) a

7.9.(1)

17

-

3.1.(1a)

DIVISI 7. STRUKTUR

9

-

41,080.75

DIVISI 3. PEKERJAAN TANAH

8

7.13.(1)

Sandaran (Railing)

M

7.15.(1)

Pembongkaran Pasangan Batu

M3

DIVISI 8. REHABILITASI JEMBATAN

-

-

8.1.(1)

Cairan Perekat (Epoksi Resin)

Kg

211,815.47

66.00

13,979,820.99

2.79

0.21

0.21

0.21

8.1.(2)

Bahan Penutup (Sealant)

Kg

198,692.60

54.00

10,729,400.40

2.14

0.16

0.16

0.16

8.1.(3a)

Tabung Penyuntik, penyediaan

Bh

51,000.00

46.00

2,346,000.00

0.47

0.04

0.04

0.04

8.1.(3b)

Tabung Penyuntik, penggunaan

Bh

63,051.49

46.00

2,900,368.40

0.58

0.04

0.04

0.04

8.3.(1b)

Pengecatan protektif pada elemen struktur beton, tebal : …. Μm



48,917.66

423.57

20,720,053.88

4.14

0.32

0.32

0.32

8.4.(1)

Perkuatan Struktur dengan bahan FRP jenis e-glass per lapis pada daera M²

2,201,036.50

33.72

74,218,950.61

14.83

1.14

1.14

1.14

8.5.(1a)

Penggantian Baut Mutu Tinggi A325 Tipe 1 diameter M25

Bh

49,894.92

16.00

798,318.64

0.16

0.01

0.01

0.01

8.5.(6a)

Pengencangan Baut Biasa Grade A diameter M25

Bh

12,494.92

16.00

199,918.64

0.04

0.00

0.00

0.00

8.7.(1c)

Pengecatan struktur baja pada daerah kering tebal ……... Mikron



85,101.35

147.59

12,560,108.84

2.51

0.19

0.19

0.19

8.11.(1)

Penggantian dan Perbaikan Sambungan siar muai Tipe Asphaltic Plug



1,555,746.64

50.00

77,787,331.80

15.54

1.20

1.20

1.20

DIVISI 9. PEKERJAAN HARIAN

-

-

9.1.(1)

Mandor

Jam

19,040.48

171.00

3,255,922.08

0.65

0.08

0.08

0.08

0.08

0.08

9.1.(2)

Pekerja Biasa

Jam

13,860.00

171.00

2,370,060.00

0.47

0.06

0.06

0.06

0.06

0.06

9.1.(3)

Tukang Kayu, Tukang Batu, dsb

Jam

15,897.62

171.00

2,718,493.02

0.54

0.07

0.07

0.07

0.07

0.07

9.1.(4) a

Dump Truck, kapasitas 3 - 4 m³

Jam

304,898.21

75.00

22,867,365.90

4.57

0.57

0.57

0.57

0.57

0.57

500,538,558.50

100.00

JUMLAH

7

14

21

28

35

42

49

56

63

70

77

84

91

98

105

112

119

126

133

RENCANA BOBOT / MINGGU

0.01

1.11

1.01

1.01

1.01

1.78

4.92

5.37

4.59

4.59

4.59

4.59

4.59

5.37

4.59

4.59

3.32

4.10

3.32

AKUMULATIF BOBOT / MIMGGU

0.01

1.13

2.13

3.14

4.14

5.93

10.84

16.21

20.80

25.38

29.97

34.55

39.14

44.50

49.09

53.68

57.00

61.10

64.43

REALISASI BOBOT / MINGGU AKUMULATIF BOBOT / MIMGGU DEVIACE +/ -

SCHEDULE

RVASI JEMBATAN

WAKTU PELAKSANAAN 210 HARI KELENDER MINGGU KE

KET 20

21

22

23

24

25

26

27

28

29

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.16

0.16

0.16

0.16

0.16

0.16

0.16

0.16

0.16

0.16

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.32

0.32

0.32

0.32

0.32

0.32

0.32

0.32

0.32

0.32

1.14

1.14

1.14

1.14

1.14

1.14

1.14

1.14

1.14

1.14

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.19

0.19

0.19

0.19

0.19

0.19

0.19

0.19

0.19

0.19

1.20

1.20

1.20

1.20

1.20

1.20

1.20

1.20

1.20

1.20

140

147

30

0.08

0.08

0.08

0.06

0.06

0.06

0.07

0.07

0.07

0.57

0.57

0.57

154

161

168

175

182

189

196

203

210

3.32

3.32

4.10

3.32

3.32

3.32

4.10

3.32

3.32

3.32

0.78

67.75

71.07

75.18

78.50

81.82

85.14

89.25

92.57

95.89

99.22

100.0

Padang , 11 Februari 2019 Penawar, PT. CITRA PERMATA SULUNG

ttd

FARDI MUBAROK Direktur Utama

TIME SCHEDULE PRESERVASI RUTIN JEMBATAN Paket Pekerjaan

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

No. Paket

: 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

Ruas Jalan

: PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

Prop / Kab / Kodya

: Sumatera Barat

WAKTU PELAKSANAAN = 300 HARI KEL NO MATA PEMBAYAR AN

ITEM PEKERJAAN

STN

HARGA SATUAN

VOLU ME

JUMLAH HARGA

MINGGU KE

BOBOT 1

2

3

4

5

6

7

8

9

0.65

0.65

0.65

0.65

0.65

0.65

0.65

0.65

0.65

0.53

0.53 0.71

0.71

0.71

0.71

0.33

0.33 0.33

0.33

0.33

0.92

0.92

10.2(1)

Pemeliharaan Kinerja Jembatan Batang Air Desa Baru Bentan

Ls

4,646,635.27

1.00

4,646,635.27

0.65

10.2(2)

Pemeliharaan Kinerja Jembatan Batahan bentang73,60 m

Ls

55,160,057.43

1.00

55,160,057.43

7.75

10.2(3)

Pemeliharaan Kinerja Jembatan Batang Napal bentang 10,00

Ls

7,494,573.02

1.00

7,494,573.02

1.05

10.2(4)

Pemeliharaan Kinerja Jembatan Batang Taming bentang 40,4

Ls

30,278,075.00

1.00

30,278,075.00

4.25

0.71

0.71

10.2(5)

Pemeliharaan Kinerja Jembatan Batang Tarok 1 bentang 6,30

Ls

4,721,581.00

1.00

4,721,581.00

0.66

0.33

0.33

10.2(6)

Pemeliharaan Kinerja Jembatan Batang Tarok 2 bentang 6,30

Ls

4,721,581.00

1.00

4,721,581.00

0.66

10.2(7)

Pemeliharaan Kinerja Jembatan Batang Tian bentang 9,40 m

Ls

7,044,898.64

1.00

7,044,898.64

0.99

10.2(8)

Pemeliharaan Kinerja Jembatan Sei Air Gadang A bentang 10

Ls

78,168,396.60

1.00

78,168,396.60

10.98

10.2(9)

Pemeliharaan Kinerja Jembatan Air Geringging Sirah bentang

Ls

4,571,689.54

1.00

4,571,689.54

0.64

10.2(10)

Pemeliharaan Kinerja Jembatan Sungai Kampung Alang bent

Ls

4,946,418.19

1.00

4,946,418.19

0.69

10.2(11)

Pemeliharaan Kinerja Jembatan Sungai Kasik Putih bentang

Ls

8,244,030.32

1.00

8,244,030.32

1.16

10.2(12)

Pemeliharaan Kinerja Jembatan Tambang Cubadak bentang 7 Ls

5,920,712.68

1.00

5,920,712.68

0.83

10.2(13)

Pemeliharaan Kinerja Jembatan Batang Tanah Periuk bentang Ls

11,241,859.53

1.00

11,241,859.53

1.58

10.2(14)

Pemeliharaan Kinerja Jembatan Air Haji bentang 62,00 m

Ls

46,466,352.72

1.00

46,466,352.72

6.53

10.2(15)

Pemeliharaan Kinerja Jembatan Sungai Paraman Udang bent

Ls

11,991,316.83

1.00

11,991,316.83

1.68

10.2(16)

Pemeliharaan Kinerja Jembatan Batang Bayang bentang 41,0

Ls

30,727,749.38

1.00

30,727,749.38

4.32

10.2(17)

Pemeliharaan Kinerja Jembatan Batang Sikabau bentang 83,

Ls

62,579,684.72

1.00

62,579,684.72

8.79

10.2(18)

Pemeliharaan Kinerja Jembatan Batang Air Kalam bentang 25

Ls

19,261,052.66

1.00

19,261,052.66

2.71

10.2(19)

Pemeliharaan Kinerja Jembatan Batang Timah A bentang 103

Ls

77,793,667.95

1.00

77,793,667.95

10.93

10.2(20)

Pemeliharaan Kinerja Jembatan Batang Timah B bentang 104

Ls

78,543,125.25

1.00

78,543,125.25

11.03

10.2(21)

Pemeliharaan Kinerja Jembatan Tingkok bentang 40,40 m

Ls

30,278,075.00

1.00

30,278,075.00

4.25

10.2(22)

Pemeliharaan Kinerja Jembatan Batang Pertumpangan benta

Ls

19,485,889.85

1.00

19,485,889.85

2.74

10.2(23)

Pemeliharaan Kinerja Jembatan Kinali bentang 31,90 m

Ls

23,907,687.93

1.00

23,907,687.93

3.36

10.2(24)

Pemeliharaan Kinerja Jembatan Paku bentang 16,00 m

Ls

11,991,316.83

1.00

11,991,316.83

1.68

10.2(25)

Pemeliharaan Kinerja Jembatan Pinagar bentang 26,60 m

Ls

19,935,564.23

1.00

19,935,564.23

2.80

10.2(26)

Pemeliharaan Kinerja Jembatan Tareh bentang 16,00 m

Ls

11,991,316.83

1.00

11,991,316.83

1.68

10.2(27)

Pemeliharaan Kinerja Jembatan Sungai Sarik bentang 26,80

Ls

20,085,455.69

1.00

20,085,455.69

2.82

10.2(28)

Pemeliharaan Kinerja JembatanSungai Ampu bentang 26,20

Ls

19,635,781.31

1.00

19,635,781.31

2.76

711,834,545.44

100.00

JUMLAH

10

11

12

13

14

15

16

17

18

19

20

21

22

23

0.65 0.65

0.65

0.65

0.92

0.92

0.32

0.32

0.92

0.92

0.35

0.35

0.92

0.92

0.92

0.39

0.39

0.39

0.73

0.73

0.92

0.92

0.42

0.42

0.92

0.39

0.39

0.39

0.73

0.73

0.73

0.73

0.73

0.73

0.71

0.71

0.71

0.71

0.71

0.71

0.91

0.91

0.91 0.67

0.67 0.42

0.71

0.71

77

0.69

0.69

0.69

0.69

84

91

98

105

14

21

28

35

42

49

0.65

0.65

1.17

1.17

1.69

1.69

1.69

2.39

2.39

3.31

2.60

2.57

2.57

2.51

2.51

2.59

2.03

2.74

3.68

3.68

3.66

2.50

2.92

AKUMULATIF BOBOT / MIMGGU

0.65

1.30

2.47

3.64

5.33

7.02

8.70

11.09

13.48

16.79

19.38

21.96

24.53

27.04

29.56

32.14

34.17

36.91

40.58

44.26

47.92

50.42

53.34

DEVIACE +/ -

70

0.56

7

REALISASI BOBOT / MINGGU

63

0.71

0.56

RENCANA BOBOT / MINGGU

AKUMULATIF BOBOT / MIMGGU

56

0.71

0.56

112

119

126

133

140

147

154

161

SCHEDULE

I RUTIN JEMBATAN

WAKTU PELAKSANAAN = 300 HARI KELENDER MINGGU KE

KET 24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

0.39 0.73 0.42

0.42

0.42

0.42

0.54

0.54

0.54

0.54

0.54

0.54

0.54

0.54

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.88

0.54

0.54

0.54

0.54

0.54

1.09

1.09

1.09

1.09

1.09

0.67

0.67

0.67

0.42

0.42

0.42

168

175

182

0.93

0.93

0.93

189

196

203

210

217

224

231

0.88

1.09

1.09

1.09

1.09

1.09

1.23

1.23

1.23

1.23

1.23

1.23

1.23

1.23

0.61

0.61

238

245

252

259

266

273

280

287

294

300

2.21

2.93

2.93

2.77

2.77

3.99

3.05

3.05

3.05

2.51

3.20

2.32

2.32

2.32

2.32

1.23

1.23

1.23

0.61

0.61

55.55

58.49

61.42

64.19

66.96

70.95

74.00

77.06

80.11

82.62

85.82

88.14

90.46

92.78

95.10

96.32

97.55

98.77

99.4

100.0

Padang , 11 Februari 2019

Penawar, PT. CITRA PERMATA SULUNG ttd

FARDI MUBARAK Direktur Utama

DAFTAR KUANTITAS DAN HARGA PENAWARAN Satker / PPK : PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) No. Paket Kontrak : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) Nama Paket : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT 0 Prov/Kab/Kodya : Sumatera Barat

No. Mata Pembayaran

Uraian

Satuan

a

b

c

1.2 1.8.(1)

DIVISI 1. UMUM Mobilisasi Manajemen dan Keselamatan Lalu Lintas

LS LS

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 2. DRAINASE 2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M3

2.2.(1)

Pasangan Batu dengan Mortar

M3

2.3.(5)

Gorong2 Pipa Baja Bergelombang

Ton

2.3.(12)

Beton K250 (fc’ 20) untuk struktur drainase beton minor

M3

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 3. PEKERJAAN TANAH 3.1.(1a)

Galian Biasa

M3

3.1.(6)

Galian Perkerasan Beraspal dengan Cold Milling Machine

M3

3.1.(7)

Galian Perkerasan Beraspal tanpa Cold Milling Machine

M3

3.2.(1a)

Timbunan Biasa dari sumber galian

M3

3.2.(2a)

Timbunan Pilihan dari sumber galian

M3

3.3.(1)

Penyiapan Badan Jalan

M2

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

No. Mata Pembayaran

Uraian

Satuan

a

b

c

DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN 4.2.(1)

Lapis Pondasi Agregat Kelas A

M3

4.2.(2a)

Lapis Pondasi Agregat Kelas B

M3

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 5. PERKERASAN BERBUTIR 5.1.(1)

Lapis Pondasi Agregat Kelas A

M3

5.3.(2)

Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal

M3

5.3.(3)

Lapis Pondasi bawah Beton Kurus

M3

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

No. Mata Pembayaran

Uraian

Satuan

a

b

c

6.1 (1)(a) 6.1 (2)(a) 6.3(5a) 6.3(6a) 6.3(6c) 6.3(7a) 6.3.(8)

DIVISI 6. PERKERASAN ASPAL Lapis Resap Pengikat - Aspal Cair Lapis Perekat - Aspal Cair Laston Lapis Aus (AC-WC) Laston Lapis Antara (AC-BC) Laston Lapis Antara Perata (AC-BC(L) Laston Lapis Pondasi (AC-Base) Bahan anti pengelupasan

Liter Liter Ton Ton Ton Ton Kg

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 7. STRUKTUR 7.1 (8)

Beton mutu rendah fc’15 MPa

M3

7.1 (10) 7.9.(1)

Beton mutu rendah fc’10 Mpa

M3

Pasangan Batu

M3

Bronjong dengan kawat yang dilapisi galvanis

M3

7.10.(3) a.

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.1 (1)

Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor

M3

8.1 (2)

Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor

M3

8.1.(5)

Campuran Aspal Panas untuk Pekerjaan Minor

M3

8.3.(1a)

Stabilisasi dengan Tanaman

M2

8.4.(1)

Marka Jalan Termoplastik

M2

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

9.1.(1) 9.1.(2)

DIVISI 9. PEKERJAAN HARIAN Mandor Pekerja Biasa

Jam Jam

No. Mata Pembayaran

Uraian

Satuan

a

b

c

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN

Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

HARGA

Perkiraan Kuantitas

Harga Satuan (Rupiah)

Jumlah Harga-Harga (Rupiah)

d

e

f = (d x e)

233,949,040.00 101,100,000.00

-

-

41,080.75 -

-

45,408,619.44

-

1,251,889.90

-

-

37,671.06

-

802,367.08

-

630,317.07

-

71,374.24

-

137,571.67

-

2,206.04

-

-

Perkiraan Kuantitas

Harga Satuan (Rupiah)

Jumlah Harga-Harga (Rupiah)

d

e

f = (d x e)

652,421.63

-

433,651.24

-

-

652,421.63

-

#N/A

#N/A

#N/A

#N/A

#N/A

Perkiraan Kuantitas

Harga Satuan (Rupiah)

Jumlah Harga-Harga (Rupiah)

d

e

f = (d x e)

12,455.27 12,696.37 1,282,164.67

-

1,230,164.84

-

1,268,527.98 1,101,265.55 65,000.00

-

-

1,031,827.52

-

944,527.99

-

688,665.98

-

594,916.67

-

-

582,379.81

-

1,161,470.40

-

2,832,808.30

-

37,689.30

-

175,253.43

-

-

19,040.48 13,860.00

-

Perkiraan Kuantitas

Harga Satuan (Rupiah)

Jumlah Harga-Harga (Rupiah)

d

e

f = (d x e) -

-

Satker / PPK No. Paket Kontrak Nama Paket Prop / Kab / Kodya

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

No. Mata Pembayaran

URAIAN PEKERJAAN

SATUAN

DIVISI 1. UMUM 1.2

Mobilisasi

LS

1.8.(1)

Manajemen dan Keselamatan Lalu Lintas

LS

Err:509

Err:509

Err:509

DIVISI 2. DRAINASE 2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M3

2.2.(1)

Pasangan Batu dengan Mortar

M3

Err:509

Err:509

Err:509

DIVISI 3. PEKERJAAN TANAH 3.1.(1a)

Galian Biasa

M3

Err:509

Err:509

3.2.(1a)

Timbunan Biasa dari sumber galian

M3

3.2.(2a)

Timbunan Pilihan dari sumber galian

M3

Err:509

DIVISI 5. PPERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN Err:509

Err:509

Err:509

DIVISI 6. PERKERASAN ASPAL Err:509

Err:509

Err:509

6.1 (2)(a)

Lapis Perekat - Aspal Cair

Liter

6.3(5a)

Laston Lapis Aus (AC-WC)

Ton

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

6.3(6a)

Laston Lapis Antara (AC-BC)

Ton

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

DIVISI 7. STRUKTUR 7.1 (7) a

Beton mutu sedang fc’20 MPa

M3

7.3 (1)

Baja Tulangan Polos BjTP 280

Kg

7.9.(1)

Pasangan Batu

M3

Bronjong dengan kawat yang dilapisi galvanis

M3

7.15.(1)

Pembongkaran Pasangan Batu

M3

Err:509

Err:509

7.10.(3) a.

Err:509

DIVISI 8. REHABILITASI JEMBATAN Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

DIVISI 9. PEKERJAAN HARIAN 9.1.(1)

Mandor

Jam

9.1.(2)

Pekerja Biasa

Jam

9.1.(4) a

Dump Truck, kapasitas 3 - 4 m³

Jam

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Jam

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA Err:509 10.1(1)

Galian Tanah untuk saluran air dan lereng

M3

10.1(3)

Pasangan Batu dengan Mortar

M3

10.1(6)

Lapis Pondasi Aggregat Klas S

M3

10.1(9)

Campuran Aspal Panas

M3

10.1(16)

Pasangan Batu

M3

10.1(22)

Pengendalian Tanaman pada Rumija



Err:509 Err:509

Err:509

Err:509

Err:509

Err:509 JUMLAH RENCANA REALISASI DEVIASI +/-

Catatan : Minggu ke 42 terpakai/dihitung 1 (Satu) Hari Kalender

Err:509

T

SEMU

KUANTITAS BOBOT

1

2

3

4

10 Maret 13 Maret 20 Maret 27 Maret s/d 12 s/d 19 s/d 26 s/d 2 Maret Maret Maret April

5 3 April s/d 9 April

6

7

8

10 April 17 April 24 April s/d 16 s/d 23 s/d 30 April April April

9

10

1 Mei s/d 7 Mei

8 Mei s/d 14 Mei

1.00

Err:509 Err:509 Err:509 Err:509 Err:509

1.00

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

1.00

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

1,200.00

Err:509

Err:509 Err:509

714.00

Err:509

Err:509

16.00

Err:509

Err:509 Err:509

588.24

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

56.00

Err:509

11.20

Err:509

57.80

Err:509

Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509

20,287.50

Err:509

Err:509

5.40

Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 200.00

Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

1.28 Err:509 600.00 Err:509

Err:509

Err:509 Err:509 Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

200.00

Err:509

19,500.00

Err:509

Err:509 Err:509 Err:509 Err:509

6.16

Err:509

Err:509 Err:509

677.59

Err:509

Err:509 Err:509 Err:509

31.19

Err:509

Err:509 Err:509 Err:509

-

Err:509

-

Err:509

Err:509 Err:509

Err:509

Err:509

Err:509 Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 Err:509

Err:509 Err:509

28.00

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

245.00

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

245.00

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

210.00

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

381.87

Err:509

-

Err:509

-

Err:509

43.65 -

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Diketahui,

Pejabat Pembuat Komitmen S 01

Satuan Kerja Dinas Prasarana Ja Provinsi Sumatera Barat

( Ir. DEWI KARNIDA, MT) Nip. 19641110 199403 2 003

TIME SCHEDULE

MUA LINGKUP (GABUNGAN)

WAKTU PELAKSANAAN = 284 (DUA RATUS DELAPAN PULUH 11

12

13

14

15

15 Mei s/d 21 Mei

22 Mei s/d 28 Mei

29 Mei s/d 4 Juni

5 Juni s/d 11 Juni

12 Juni s/d 18 Juni

16

17

18

19 Juni 26 Juni 3 Juli s/d s/d 25 s/d 2 Juli 9 Juli Juni

19 10 Juli s/d 16 Juli

MINGGU KE 20 21 22 17 Juli s/d 23 Juli

24 Juli s/d 30 Juli

31 Juli s/d 6 Agust

23

24

7 Agust 14 Agust s/d 13 s/d 20 Agust Agust

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509

Err:509 Err:509

Err:509 Err:509

Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

en S 01

ana Jalan

Diperiksa,

Konsultan Supe

PT. ANUGERAH KRID

rat

MT)

( Ir. EDRIZAL JAM

003

Supervision Eng

LUH EMPAT) HARI KALENDER 25

26

21 Agust 28 Agust s/d 27 s/d 3 Agust Sept

27

28

4 Sept s/d 10 Sept

11 Sept s/d 17 Sept

29

30

31

32

33

18 Sept 16 Okt 25 Sept 2 Okt s/d 9 Okt s/d s/d 24 s/d 22 s/d 1 Okt 8 Okt 15 Okt Sept Okt

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

34

35

36

37

38

23 Okt s/d 29 Okt

30 Okt s/d 5 Nov

6 Nov s/d 12 Nov

13 Nov s/d 19 Nov

20 Nov s/d 26 Nov

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

0.433

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

iksa,

Supervisi

RIDAPRADANA

JAMAL, MT )

n Engineer

Padang, 06 Februa

Pelaksana,

PT. PRIMA MARINDO N

Ir. RHEMON KA

General Superinte

39

40

41

42

27 Nov s/d 3 Des

4 Des s/d 10 Des

11 Des s/d 17 Des

18 Des

%

PHO 100

90

80

70

60

50

40

30

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

20

Err:509 Err:509

10

Err:509

Err:509

0

Err:509 Err:509

0.000

0.000

Err:509 Err:509 Err:509 Err:509

Padang, 06 Februari 2019 Pelaksana, PT. PRIMA MARINDO NUSANTARA

Ir. RHEMON KAMIL General Superintendent

TI

PE Satker / PPK No. Paket Kontrak Nama Paket Prop / Kab / Kodya

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

No. Mata PembaURAIAN PEKERJAAN

SATUAN KUANTITAS BOBOT

yaran

Mobilisasi

LS

-

Err:509

1.8.(1)

Manajemen dan Keselamatan Lalu Lintas

LS

-

Err:509

Err:509

Err:509

Err:509

-

Err:509

DIVISI 2. DRAINASE 2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M3

-

Err:509

2.2.(1)

Pasangan Batu dengan Mortar

M3

-

Err:509

Err:509

Err:509

Err:509

-

Err:509

DIVISI 3. PEKERJAAN TANAH 3.1.(1a)

Galian Biasa

Err:509

Err:509

3.2.(1a) 3.2.(2a)

M3

Err:509

Err:509

Err:509

Timbunan Biasa dari sumber galian

M3

Err:509

Timbunan Pilihan dari sumber galian

M3

Err:509

DIVISI 5. PPERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

DIVISI 6. PERKERASAN ASPAL Err:509

2

3

4

10 Maret 13 Maret 20 Maret 27 Maret s/d 12 s/d 19 s/d 26 s/d 2 Maret Maret Maret April

DIVISI 1. UMUM 1.2

1

Err:509

6.1 (2)(a)

Lapis Perekat - Aspal Cair

Liter

Err:509

6.3(5a)

Laston Lapis Aus (AC-WC)

Ton

Err:509

Err:509

Err:509

Err:509

Err:509

5 3 April s/d 9 April

6

7

8

10 April 17 April 24 April s/d 16 s/d 23 s/d 30 April April April

9

10

1 Mei s/d 7 Mei

8 Mei s/d 14 Mei

Err:509

Err:509

Err:509

Err:509

6.3(6a)

Laston Lapis Antara (AC-BC)

Ton

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

DIVISI 7. STRUKTUR 7.1 (7) a

Beton mutu sedang fc’20 MPa

M3

Err:509

7.3 (1)

Baja Tulangan Polos BjTP 280

Kg

Err:509

7.9.(1)

Pasangan Batu

M3

Err:509

Bronjong dengan kawat yang dilapisi galvanis

M3

Err:509

7.15.(1)

Pembongkaran Pasangan Batu

M3

Err:509

Err:509

Err:509

Err:509

Err:509

7.10.(3) a.

DIVISI 8. REHABILITASI JEMBATAN Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

DIVISI 9. PEKERJAAN HARIAN 9.1.(1)

Mandor

Jam

35.00

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

9.1.(2)

Pekerja Biasa

Jam

56.00

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

9.1.(4) a

Dump Truck, kapasitas 3 - 4 m³

Jam

84.00

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Jam

84.00

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA Err:509 10.1(1)

Galian Tanah untuk saluran air dan lereng

M3

2,816.04

Err:509

10.1(3)

Pasangan Batu dengan Mortar

M3

120.72

Err:509

10.1(6)

Lapis Pondasi Aggregat Klas S

M3

10.1(9)

Campuran Aspal Panas

M3

527.70

Err:509

10.1(16)

Pasangan Batu

M3

87.20

Err:509

10.1(22)

Pengendalian Tanaman pada Rumija



Err:509

Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

JUMLAH RENCANA REALISASI DEVIASI +/-

Err:509 0.000

0.000

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

-

0.000

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

0.000

Catatan : Minggu ke 42 terpakai/dihitung 1 (Satu) Hari Kalender Diketahui, Pejabat Pembuat Komitmen S 01

Satuan Kerja Dinas Prasarana Jala Provinsi Sumatera Barat

( Ir. DEWI KARNIDA, MT) Nip. 19641110 199403 2 003

TIME SCHEDULE PEMELIHARAAN RUTIN

WAKTU PELAKSANAAN = 284 (DUA RATUS DELAPAN PULUH EMPAT) HARI KALENDER 11

12

13

14

15

15 Mei s/d 21 Mei

22 Mei s/d 28 Mei

29 Mei s/d 4 Juni

5 Juni s/d 11 Juni

12 Juni s/d 18 Juni

16

17

18

19 Juni 26 Juni 3 Juli s/d s/d 25 s/d 2 Juli 9 Juli Juni

19 10 Juli s/d 16 Juli

MINGGU KE 20 21 22 17 Juli s/d 23 Juli

24 Juli s/d 30 Juli

31 Juli s/d 6 Agust

23

24

25

26

7 Agust 14 Agust 21 Agust 28 Agust s/d 13 s/d 20 s/d 27 s/d 3 Agust Agust Agust Sept

27

28

4 Sept s/d 10 Sept

11 Sept s/d 17 Sept

29

30

31

32

33

18 Sept 16 Okt 25 Sept 2 Okt s/d 9 Okt s/d s/d 24 s/d 22 s/d 1 Okt 8 Okt 15 Okt Sept Okt

34

35

36

37

38

23 Okt s/d 29 Okt

30 Okt s/d 5 Nov

6 Nov s/d 12 Nov

13 Nov s/d 19 Nov

20 Nov s/d 26 Nov

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

0.000

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Diperiksa,

men S 01

arana Jalan

Konsultan Supervisi PT. ANUGERAH KRIDAPRADANA

Padang, 06 Februari Pelaksana,

PT. PRIMA MARINDO NU

Barat

A, MT)

( Ir. EDRIZAL JAMAL, MT )

2 003

Supervision Engineer

Ir. RHEMON KAM

General Superinten

KALENDER 39

40

41

42

27 Nov s/d 3 Des

4 Des s/d 10 Des

11 Des s/d 17 Des

18 Des

%

PHO 100

90

80

70

60

50

40

30

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

20

Err:509 Err:509

10

Err:509

0

Err:509 Err:509

0.000

0.000

Err:509 Err:509 Err:509 Err:509

Padang, 06 Februari 2019 Pelaksana, PT. PRIMA MARINDO NUSANTARA

Ir. RHEMON KAMIL General Superintendent

TI

PEMELI Satker / PPK No. Paket Kontrak Nama Paket Prop / Kab / Kodya

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

No. Mata PembaURAIAN PEKERJAAN

SATUAN KUANTITAS

BOBOT

yaran

1

2

3

4

10 Maret 13 Maret 20 Maret 27 Maret s/d 12 s/d 19 s/d 26 s/d 2 Maret Maret Maret April

5 3 April s/d 9 April

6

7

8

10 April 17 April 24 April s/d 16 s/d 23 s/d 30 April April April

9

10

1 Mei s/d 7 Mei

8 Mei s/d 14 Mei

DIVISI 1. UMUM 1.2

Mobilisasi

LS

-

Err:509

1.8.(1)

Manajemen dan Keselamatan Lalu Lintas

LS

-

Err:509

Err:509

Err:509

Err:509

-

Err:509

DIVISI 2. DRAINASE 2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M3

-

Err:509

2.2.(1)

Pasangan Batu dengan Mortar

M3

-

Err:509

Err:509

Err:509

Err:509

-

Err:509

M3

2.88

Err:509

DIVISI 3. PEKERJAAN TANAH 3.1.(1a)

Galian Biasa

Err:509

Err:509

3.2.(1a) 3.2.(2a)

Err:509

Err:509

Timbunan Biasa dari sumber galian

M3

Err:509

Timbunan Pilihan dari sumber galian

M3

-

Err:509

Err:509 Err:509

Err:509

DIVISI 5. PPERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN Err:509

Err:509

Err:509

Err:509

DIVISI 6. PERKERASAN ASPAL Err:509

Err:509

Err:509

6.1 (2)(a)

Lapis Perekat - Aspal Cair

Liter

6.3(5a)

Laston Lapis Aus (AC-WC)

Ton

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 -

Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509

Err:509 Err:509 Err:509 Err:509

6.3(6a)

Laston Lapis Antara (AC-BC)

Ton

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 Err:509 Err:509

Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

DIVISI 7. STRUKTUR 7.1 (7) a

Beton mutu sedang fc’20 MPa

M3

9.79

Err:509

7.3 (1)

Baja Tulangan Polos BjTP 280

Kg

-

Err:509

7.9.(1)

Pasangan Batu

M3

Bronjong dengan kawat yang dilapisi galvanis

M3

7.15.(1)

Pembongkaran Pasangan Batu

M3

Err:509

Err:509

Err:509

Err:509

Err:509

7.10.(3) a.

Err:509

Err:509

Err:509 155.17

Err:509

DIVISI 8. REHABILITASI JEMBATAN Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 Err:509

Err:509

DIVISI 9. PEKERJAAN HARIAN 9.1.(1)

Mandor

Jam

171.00

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

9.1.(2)

Pekerja Biasa

Jam

171.00

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

9.1.(4) a

Dump Truck, kapasitas 3 - 4 m³

Jam

75.00

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Jam

-

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA Err:509 10.1(1)

Galian Tanah untuk saluran air dan lereng

M3

-

Err:509

10.1(3)

Pasangan Batu dengan Mortar

M3

-

Err:509

10.1(6)

Lapis Pondasi Aggregat Klas S

M3

-

Err:509

10.1(9)

Campuran Aspal Panas

M3

-

Err:509

10.1(16)

Pasangan Batu

M3

-

Err:509

10.1(22)

Pengendalian Tanaman pada Rumija



Err:509

Err:509

Err:509

Err:509 Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509 JUMLAH RENCANA REALISASI DEVIASI +/-

Err:509

Err:509 Err:509 0.000

0.000

0.000

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

-

0.000

0.000

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

0.000

Catatan : Minggu ke 42 terpakai/dihitung 1 (Satu) Hari Kalender Diketahui,

Pejabat Pembuat Komitmen S 01

Satuan Kerja Dinas Prasarana Jal Provinsi Sumatera Barat

( Ir. DEWI KARNIDA, MT) Nip. 19641110 199403 2 003

TIME SCHEDULE

ELIHARAAN RUTIN KONDISI

WAKTU PELAKSANAAN = 284 (DUA RATUS DELAPAN PULUH EMPAT) HARI KALENDER 11

12

13

14

15

15 Mei s/d 21 Mei

22 Mei s/d 28 Mei

29 Mei s/d 4 Juni

5 Juni s/d 11 Juni

12 Juni s/d 18 Juni

Err:509

Err:509

Err:509

16

17

18

19 Juni 26 Juni 3 Juli s/d s/d 25 s/d 2 Juli 9 Juli Juni

19 10 Juli s/d 16 Juli

MINGGU KE 20 21 22 17 Juli s/d 23 Juli

24 Juli s/d 30 Juli

31 Juli s/d 6 Agust

23

24

25

26

7 Agust 14 Agust 21 Agust 28 Agust s/d 13 s/d 20 s/d 27 s/d 3 Agust Agust Agust Sept

27

28

4 Sept s/d 10 Sept

11 Sept s/d 17 Sept

29

30

31

32

33

18 Sept 16 Okt 25 Sept 2 Okt s/d 9 Okt s/d s/d 24 s/d 22 s/d 1 Okt 8 Okt 15 Okt Sept Okt

34

35

36

37

38

23 Okt s/d 29 Okt

30 Okt s/d 5 Nov

6 Nov s/d 12 Nov

13 Nov s/d 19 Nov

20 Nov s/d 26 Nov

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

0.000

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Diperiksa,

men S 01

arana Jalan

Konsultan Supervisi PT. ANUGERAH KRIDAPRADANA

Padang, 06 Februari Pelaksana,

PT. PRIMA MARINDO NU

Barat

A, MT)

( Ir. EDRIZAL JAMAL, MT )

2 003

Supervision Engineer

Ir. RHEMON KAM

General Superinten

KALENDER 39

40

41

42

27 Nov s/d 3 Des

4 Des s/d 10 Des

11 Des s/d 17 Des

18 Des

%

PHO 100

90

80

70

60

50

40

30

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

20

Err:509 Err:509

10

0

Err:509 Err:509

0.000

0.000

Err:509 Err:509 Err:509 Err:509

Padang, 06 Februari 2019 Pelaksana, PT. PRIMA MARINDO NUSANTARA

Ir. RHEMON KAMIL General Superintendent

TIME SC

REHABILIT Satker / PPK No. Paket Kontrak Nama Paket Prop / Kab / Kodya

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

No. Mata PembaURAIAN PEKERJAAN

SATUAN KUANTITAS

BOBOT

yaran

Mobilisasi

LS

-

Err:509

1.8.(1)

Manajemen dan Keselamatan Lalu Lintas

LS

-

Err:509

Err:509

Err:509

Err:509

-

Err:509

DIVISI 2. DRAINASE 2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M3

-

Err:509

2.2.(1)

Pasangan Batu dengan Mortar

M3

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

DIVISI 3. PEKERJAAN TANAH 3.1.(1a)

Galian Biasa

Err:509

Err:509

3.2.(1a)

Timbunan Biasa dari sumber galian

M3

3.2.(2a)

Timbunan Pilihan dari sumber galian

M3

M3 Err:509

Err:509

Err:509 Err:509

-

Err:509 Err:509

DIVISI 5. PPERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

DIVISI 6. PERKERASAN ASPAL Err:509

2

3

4

10 Maret 13 Maret 20 Maret 27 Maret s/d 12 s/d 19 s/d 26 s/d 2 Maret Maret Maret April

DIVISI 1. UMUM 1.2

1

Err:509

6.1 (2)(a)

Lapis Perekat - Aspal Cair

Liter

6.3(5a)

Laston Lapis Aus (AC-WC)

Ton

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

-

Err:509 Err:509

Err:509

Err:509 Err:509

6.3(6a)

Laston Lapis Antara (AC-BC)

Ton

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

DIVISI 7. STRUKTUR 7.1 (7) a

Beton mutu sedang fc’20 MPa

M3

-

Err:509

7.3 (1)

Baja Tulangan Polos BjTP 280

Kg

-

Err:509

7.9.(1)

Pasangan Batu

M3

-

Err:509

Bronjong dengan kawat yang dilapisi galvanis

M3

7.15.(1)

Pembongkaran Pasangan Batu

M3

Err:509

Err:509

7.10.(3) a.

Err:509 -

Err:509

Err:509

Err:509

Err:509

DIVISI 8. REHABILITASI JEMBATAN Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 Err:509

Err:509 Err:509

Err:509

Err:509

DIVISI 9. PEKERJAAN HARIAN 9.1.(1)

Mandor

Jam

-

Err:509

9.1.(2)

Pekerja Biasa

Jam

-

Err:509

9.1.(4) a

Dump Truck, kapasitas 3 - 4 m³

Jam

-

Err:509

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Jam

-

Err:509

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA Err:509 10.1(1)

Galian Tanah untuk saluran air dan lereng

M3

Err:509

10.1(3)

Pasangan Batu dengan Mortar

M3

Err:509

10.1(6)

Lapis Pondasi Aggregat Klas S

M3

Err:509

10.1(9)

Campuran Aspal Panas

M3

Err:509

10.1(16)

Pasangan Batu

M3

Err:509

10.1(22)

Pengendalian Tanaman pada Rumija



Err:509

Err:509

Err:509

Err:509 Err:509

Err:509

Err:509

Err:509 JUMLAH RENCANA REALISASI DEVIASI +/-

Err:509

Err:509 Err:509 0.000

0.000

0.000

0.000

-

0.000

0.000

0.000

0.000

Diketahui,

Pejabat Pembuat Komitm

Satuan Kerja Dinas Prasar

Provinsi Sumatera Ba

( Ir. DEWI KARNIDA,

Nip. 19641110 199403 2

SCHEDULE

LITASI MINOR

WAKTU PELAKSANAAN = 210 (DUA RATUS SEPULUH) HARI KALENDER 5 3 April s/d 9 April

6

7

8

10 April 17 April 24 April s/d 16 s/d 23 s/d 30 April April April

9

10

11

12

13

14

1 Mei s/d 7 Mei

8 Mei s/d 14 Mei

15 Mei s/d 21 Mei

22 Mei s/d 28 Mei

29 Mei s/d 4 Juni

5 Juni s/d 11 Juni

MINGGU KE 15 16 17 12 Juni s/d 18 Juni

18

19 Juni 26 Juni 3 Juli s/d s/d 25 s/d 2 Juli 9 Juli Juni

19

20

21

22

10 Juli s/d 16 Juli

17 Juli s/d 23 Juli

24 Juli s/d 30 Juli

31 Juli s/d 6 Agust

23

24

25

26

7 Agust 14 Agust 21 Agust 28 Agust s/d 13 s/d 20 s/d 27 s/d 3 Agust Agust Agust Sept

27

28

4 Sept s/d 10 Sept

11 Sept s/d 17 Sept

29

30

31

%

18 Sept 25 Sept 2 Okt s/d s/d 24 s/d 1 Okt 5 Okt Sept 100

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

90

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

80

Err:509 Err:509 Err:509 Err:509

Err:509 70

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509

Err:509

Err:509 Err:509

60

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

50

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 40

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 30

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

20

10

0

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

0.000

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

0.000

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

ahui,

Diperiksa,

Padang, 06 Februari 2019

Konsultan Supervisi

Pelaksana,

PT. ANUGERAH KRIDAPRADANA

PT. PRIMA MARINDO NUSANTARA

RNIDA, MT)

( Ir. EDRIZAL JAMAL, MT )

Ir. RHEMON KAMIL

199403 2 003

Supervision Engineer

General Superintendent

Komitmen S 01

as Prasarana Jalan

matera Barat

%

100

90

80

70

60

50

40

30

20

10

0

TIME SCHED

REKONSRUK Satker / PPK No. Paket Kontrak Nama Paket Prop / Kab / Kodya

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

No. Mata PembaURAIAN PEKERJAAN

SATUAN KUANTITAS

BOBOT

yaran

1

2

3

4

10 Maret 13 Maret 20 Maret 27 Maret s/d 12 s/d 19 s/d 26 s/d 2 Maret Maret Maret April

5 3 April s/d 9 April

6

7

10 April 17 April s/d 16 s/d 23 April April

DIVISI 1. UMUM 1.2

Mobilisasi

LS

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

1.8.(1)

Manajemen dan Keselamatan Lalu Lintas

LS

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

DIVISI 2. DRAINASE 2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M3

Err:509

Err:509

2.2.(1)

Pasangan Batu dengan Mortar

M3

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

M3

Err:509

Err:509

Err:509

Err:509

Err:509

DIVISI 3. PEKERJAAN TANAH 3.1.(1a)

Galian Biasa

Err:509

Err:509

3.2.(1a)

Timbunan Biasa dari sumber galian

M3

3.2.(2a)

Timbunan Pilihan dari sumber galian

M3

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

DIVISI 5. PPERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN Err:509

Err:509 DIVISI 6. PERKERASAN ASPAL

Err:509

Err:509

6.1 (2)(a)

Lapis Perekat - Aspal Cair

Liter

6.3(5a)

Laston Lapis Aus (AC-WC)

Ton

Err:509

Err:509

Err:509

Err:509 Err:509

Err:509

Err:509 Err:509

Err:509

Err:509

Err:509

Err:509

6.3(6a)

Laston Lapis Antara (AC-BC)

Ton

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

DIVISI 7. STRUKTUR 7.1 (7) a

Beton mutu sedang fc’20 MPa

M3

Err:509

Err:509

7.3 (1)

Baja Tulangan Polos BjTP 280

Kg

Err:509

Err:509

7.9.(1)

Pasangan Batu

M3

Err:509

Err:509

Bronjong dengan kawat yang dilapisi galvanis

M3

7.15.(1)

Pembongkaran Pasangan Batu

M3

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7.10.(3) a.

Err:509

DIVISI 8. REHABILITASI JEMBATAN Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 Err:509

Err:509 Err:509

DIVISI 9. PEKERJAAN HARIAN 9.1.(1)

Mandor

Jam

Err:509

Err:509

9.1.(2)

Pekerja Biasa

Jam

Err:509

Err:509

9.1.(4) a

Dump Truck, kapasitas 3 - 4 m³

Jam

Err:509

Err:509

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Jam

Err:509

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA Err:509 10.1(1)

Galian Tanah untuk saluran air dan lereng

M3

Err:509

10.1(3)

Pasangan Batu dengan Mortar

M3

Err:509

10.1(6)

Lapis Pondasi Aggregat Klas S

M3

Err:509

10.1(9)

Campuran Aspal Panas

M3

Err:509

10.1(16)

Pasangan Batu

M3

Err:509

10.1(22)

Pengendalian Tanaman pada Rumija



Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

JUMLAH RENCANA REALISASI DEVIASI +/-

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Diketahui, Pejabat Pembuat Komitmen S 01

Satuan Kerja Dinas Prasarana Jalan Provinsi Sumatera Barat

( Ir. DEWI KARNIDA, MT) Nip. 19641110 199403 2 003

CHEDULE

NSRUKSI

WAKTU PELAKSANAAN = 210 (DUA RATUS SEPULUH) HARI KALENDER 8

9

10

11

12

13

14

24 April s/d 30 April

1 Mei s/d 7 Mei

8 Mei s/d 14 Mei

15 Mei s/d 21 Mei

22 Mei s/d 28 Mei

29 Mei s/d 4 Juni

5 Juni s/d 11 Juni

MINGGU KE 15 16 17 12 Juni s/d 18 Juni

18

19 Juni 26 Juni 3 Juli s/d s/d 25 s/d 2 Juli 9 Juli Juni

19

20

21

22

10 Juli s/d 16 Juli

17 Juli s/d 23 Juli

24 Juli s/d 30 Juli

31 Juli s/d 6 Agust

23

24

25

26

7 Agust 14 Agust 21 Agust 28 Agust s/d 13 s/d 20 s/d 27 s/d 3 Agust Agust Agust Sept

27

28

4 Sept s/d 10 Sept

11 Sept s/d 17 Sept

29

30

31

%

18 Sept 25 Sept 2 Okt s/d s/d 24 s/d 1 Okt 5 Okt Sept 100

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

90

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 80

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

70

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

60

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

50

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 40

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

30

20

10

0

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Diperiksa,

Padang, 06 Februari 2019

Konsultan Supervisi

Pelaksana,

PT. ANUGERAH KRIDAPRADANA

PT. PRIMA MARINDO NUSANTARA

( Ir. EDRIZAL JAMAL, MT )

Ir. RHEMON KAMIL

Supervision Engineer

General Superintendent

TI

PEMELIH Satker / PPK No. Paket Kontrak Nama Paket Prop / Kab / Kodya

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

No. Mata PembaURAIAN PEKERJAAN

SATUAN KUANTITAS BOBOT

yaran

Mobilisasi

LS

-

Err:509

1.8.(1)

Manajemen dan Keselamatan Lalu Lintas

LS

-

Err:509

Err:509

Err:509

Err:509

-

Err:509

DIVISI 2. DRAINASE 2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M3

-

Err:509

2.2.(1)

Pasangan Batu dengan Mortar

M3

-

Err:509

Err:509

Err:509

Err:509

-

Err:509

DIVISI 3. PEKERJAAN TANAH 3.1.(1a)

Galian Biasa

Err:509

Err:509

3.2.(1a) 3.2.(2a)

M3

Err:509

Err:509

Err:509

Timbunan Biasa dari sumber galian

M3

Err:509

Timbunan Pilihan dari sumber galian

M3

Err:509

DIVISI 5. PPERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

DIVISI 6. PERKERASAN ASPAL Err:509

2

3

4

10 Maret 13 Maret 20 Maret 27 Maret s/d 12 s/d 19 s/d 26 s/d 2 Maret Maret Maret April

DIVISI 1. UMUM 1.2

1

Err:509

6.1 (2)(a)

Lapis Perekat - Aspal Cair

Liter

Err:509

6.3(5a)

Laston Lapis Aus (AC-WC)

Ton

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

5 3 April s/d 9 April

6

7

8

10 April 17 April 24 April s/d 16 s/d 23 s/d 30 April April April

9

10

1 Mei s/d 7 Mei

8 Mei s/d 14 Mei

6.3(6a)

Laston Lapis Antara (AC-BC)

Ton

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

DIVISI 7. STRUKTUR 7.1 (7) a

Beton mutu sedang fc’20 MPa

M3

Err:509

7.3 (1)

Baja Tulangan Polos BjTP 280

Kg

Err:509

7.9.(1)

Pasangan Batu

M3

Err:509

Bronjong dengan kawat yang dilapisi galvanis

M3

Err:509

7.15.(1)

Pembongkaran Pasangan Batu

M3

Err:509

Err:509

Err:509

Err:509

Err:509

7.10.(3) a.

DIVISI 8. REHABILITASI JEMBATAN Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

DIVISI 9. PEKERJAAN HARIAN 9.1.(1)

Mandor

Jam

Err:509

9.1.(2)

Pekerja Biasa

Jam

Err:509

9.1.(4) a

Dump Truck, kapasitas 3 - 4 m³

Jam

Err:509

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Jam

Err:509

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA Err:509 10.1(1)

Galian Tanah untuk saluran air dan lereng

M3

Err:509

10.1(3)

Pasangan Batu dengan Mortar

M3

Err:509

10.1(6)

Lapis Pondasi Aggregat Klas S

M3

Err:509

10.1(9)

Campuran Aspal Panas

M3

10.1(16)

Pasangan Batu

M3

Err:509

10.1(22)

Pengendalian Tanaman pada Rumija



Err:509

571.35

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509 JUMLAH RENCANA REALISASI DEVIASI +/-

Err:509

Err:509

Err:509 Err:509 0.000

0.000

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

-

0.000

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

0.000

Catatan : Minggu ke 42 terpakai/dihitung 1 (Satu) Hari Kalender Diketahui, Pejabat Pembuat Komitmen S 01

Satuan Kerja Dinas Prasarana Jala Provinsi Sumatera Barat

( Ir. DEWI KARNIDA, MT) Nip. 19641110 199403 2 003

TIME SCHEDULE

ELIHARAAN RUTIN JEMBATAN

WAKTU PELAKSANAAN = 284 (DUA RATUS DELAPAN PULUH EMPAT) HARI KALENDER 11

12

13

14

15

15 Mei s/d 21 Mei

22 Mei s/d 28 Mei

29 Mei s/d 4 Juni

5 Juni s/d 11 Juni

12 Juni s/d 18 Juni

16

17

18

19 Juni 26 Juni 3 Juli s/d s/d 25 s/d 2 Juli 9 Juli Juni

19 10 Juli s/d 16 Juli

MINGGU KE 20 21 22 17 Juli s/d 23 Juli

24 Juli s/d 30 Juli

31 Juli s/d 6 Agust

23

24

25

26

7 Agust 14 Agust 21 Agust 28 Agust s/d 13 s/d 20 s/d 27 s/d 3 Agust Agust Agust Sept

27

28

4 Sept s/d 10 Sept

11 Sept s/d 17 Sept

29

30

31

32

33

18 Sept 16 Okt 25 Sept 2 Okt s/d 9 Okt s/d s/d 24 s/d 22 s/d 1 Okt 8 Okt 15 Okt Sept Okt

34

35

36

37

38

23 Okt s/d 29 Okt

30 Okt s/d 5 Nov

6 Nov s/d 12 Nov

13 Nov s/d 19 Nov

20 Nov s/d 26 Nov

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

0.000

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Diperiksa,

men S 01

arana Jalan

Konsultan Supervisi PT. ANUGERAH KRIDAPRADANA

Padang, 06 Februari Pelaksana,

PT. PRIMA MARINDO NU

Barat

A, MT)

( Ir. EDRIZAL JAMAL, MT )

2 003

Supervision Engineer

Ir. RHEMON KAM

General Superinten

KALENDER 39

40

41

42

27 Nov s/d 3 Des

4 Des s/d 10 Des

11 Des s/d 17 Des

18 Des

%

PHO 100

90

80

70

60

50

40

30

20

10

Err:509

0

Err:509

0.000

0.000

0.000

Err:509 Err:509 Err:509 Err:509

Padang, 06 Februari 2019 Pelaksana, PT. PRIMA MARINDO NUSANTARA

Ir. RHEMON KAMIL General Superintendent

DAFTAR KUANTITAS DAN HARGA Satker / PPK

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

No. Paket Kontrak

: 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

Nama Paket

: PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

Prop / Kab / Kodya

: Sumatera Barat PRESERVASI REKONSTRUKSI /REHABILITASI JALAN

MATA PEMBA YARAN UTAMA

URAIAN

STN

HARGA SATUAN (RUPIAH)

PRESERVASI PEMELIHARAAN RUTIN JALAN

PRESERVASI JEMBATAN

PRESERVASI RUTIN JEMBATAN TOTAL VOLUME

VOLUME

JUMLAH HARGA (RUPIAH)

VOLUME

JUMLAH HARGA (RUPIAH)

JUMLAH HARGA (RUPIAH)

VOLUME

VOLUME

JUMLAH HARGA (RUPIAH)

JUMLAH HARGA SATUAN (RUPIAH)

DIVISI 1. UMUM 1.2 1.8.(1) 1.19

Mobilisasi

LS

233,949,040.00

1.00

233,949,040.00

-

1.00

233,949,040.00

Manajemen dan Keselamatan Lalu Lintas

LS

30,980,000.00

1.00

30,980,000.00

-

1.00

30,980,000.00

Keselamatan dan Kesehatan Kerja

LS

178,500,000.00

1.00

178,500,000.00

1.00

178,500,000.00

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

443,429,040.00

-

443,429,040.00

DIVISI 2. DRAINASE 2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M3

41,080.75

1,200.00

49,296,894.39

9.60

394,375.16

-

1,209.60

49,691,269.54

2.2.(1)

Pasangan Batu dengan Mortar

M

632,042.91

714.00

451,278,638.55

15.20

9,607,052.25

-

729.20

460,885,690.79

3

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

500,575,532.93

10,001,427.40

-

510,576,960.34

DIVISI 3. PEKERJAAN TANAH 3.1.(1a)

Galian Biasa

M3

37,671.06

3

588.24

22,159,624.33

-

2.88

108,492.65

-

591.12

22,268,116.99

3.1.(9).

Galian Perkerasan Berbutir

M

205,544.20

-

59.28

12,184,660.20

59.28

12,184,660.20

3.2.(1a)

Timbunan Biasa dari sumber galian

M3

71,374.24

-

17.40

1,241,911.75

17.40

1,241,911.75

3.2.(2a)

Timbunan Pilihan dari sumber galian

M

137,571.67

6,146,702.06

-

-

44.68

6,146,702.06

3

44.68

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

28,306,326.39

-

13,535,064.60

-

41,841,390.99

DIVISI 4. PEKERJAAN PREVENTIF 4.4.(2)

Penghamparan lapis penutup bubur aspal emulsi, tipe 1, CQS-1h / QS-1



20,700.26

709.00

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

14,676,486.11 14,676,486.11

-

-

-

709.00

-

14,676,486.11 14,676,486.11

DIVISI 5. PPERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 5.1.(3)

Lapis Pondasi Agregat Kelas S

364,251.36

853.77

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

310,986,884.75 310,986,884.75

-

-

-

-

853.77

-

310,986,884.75 310,986,884.75

DIVISI 6. PERKERASAN ASPAL 6.1 (2)(a)

Lapis Perekat - Aspal Cair

Liter

12,696.37

5,715.00

72,559,773.66

-

-

5,715.00

72,559,773.66

6.3(5a)

Laston Lapis Aus (AC-WC)

Ton

1,282,164.67

1,471.30

1,886,448,880.10

-

-

1,471.30

1,886,448,880.10

6.3(6a)

Laston Lapis Antara (AC-BC)

Ton

1,230,164.84

1,495.53

1,839,748,418.06

-

-

1,495.53

1,839,748,418.06

6.3.(8)

Bahan anti pengelupasan

Kg

65,000.00

356.02

23,141,300.00

-

-

356.02

23,141,300.00

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

3,821,898,371.81

-

-

3,821,898,371.81

DIVISI 7. STRUKTUR 7.1 (7) a

Beton mutu sedang fc’20 MPa

M3

1,495,768.69

6.16

9,213,935.13

9.79

14,643,575.48

-

15.95

23,857,510.61

PRESERVASI REKONSTRUKSI /REHABILITASI JALAN

MATA PEMBA YARAN UTAMA

URAIAN

STN

HARGA SATUAN (RUPIAH)

PRESERVASI PEMELIHARAAN RUTIN JALAN

PRESERVASI JEMBATAN

TOTAL VOLUME JUMLAH HARGA (RUPIAH)

VOLUME

JUMLAH HARGA (RUPIAH)

VOLUME

9,213,935.13 1,031,827.52

JUMLAH HARGA (RUPIAH)

VOLUME -

-

23,857,510.61

64,045,534.18

-

62.07

64,045,534.18

-

-

677.59

10,470,973.31

Beton mutu rendah fc’15 MPa

M

Baja Tulangan Polos BjTP 280

Kg

15,453.26

7.4 (1) a

Penyediaan Baja Struktur Grade 250 (Kuat Leleh 250 MPa)

Kg

16,848.84

-

59.97

1,010,425.07

-

59.97

1,010,425.07

7.4 (2) a

Pemasangan Baja Struktur

Kg

956.84

-

59.97

57,381.65

-

59.97

57,381.65

-

91.05

62,703,037.51

155.17

92,313,219.17

Pasangan Batu

M

7.10.(3) a.

Bronjong dengan kawat yang dilapisi galvanis

M3

688,665.98 594,916.67

7.11.(1) a.

1

Expansion Joint Tipe Asphaltic Plug, Fixed

M

7.13.(1)

Sandaran (Railing)

M1

2,103,466.27 619,359.42

7.15.(1)

Pembongkaran Pasangan Batu

M3

354,708.51

677.59

31.19

62.07

14,643,575.48

7.3 (1)

3

-

JUMLAH HARGA (RUPIAH)

VOLUME

JUMLAH HARGA SATUAN (RUPIAH)

7.1 (8)

7.9.(1)

3

PRESERVASI RUTIN JEMBATAN

10,470,973.31

21,479,491.93

59.86

41,223,545.58

155.17

92,313,219.17 -

-

-

18.00

11,148,469.61

18.00

11,148,469.61

14.40

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

41,164,400.37

-

5,107,802.56

14.40

229,549,953.29

-

5,107,802.56 270,714,353.66

DIVISI 8. REHABILITASI JEMBATAN 8.1.(1)

Cairan Perekat (Epoksi Resin)

Kg

199,355.74

66.00

13,157,478.58

66.00

13,157,478.58

8.1.(2)

Bahan Penutup (Sealant)

Kg

187,004.80

54.00

10,098,259.20

54.00

10,098,259.20

8.1.(3a)

Tabung Penyuntik, penyediaan

Bh

48,000.00

46.00

2,208,000.00

46.00

2,208,000.00

8.1.(3b)

Tabung Penyuntik, penggunaan

Bh

59,342.58

46.00

2,729,758.50

46.00

2,729,758.50

8.3.(1b)

Pengecatan protektif pada elemen struktur beton, tebal : …. Μm



46,040.15

423.57

19,501,227.18

423.57

19,501,227.18

2,071,563.76

33.72

69,853,129.99

33.72

69,853,129.99

46,959.92

16.00

751,358.72

16.00

751,358.72

8.4.(1)

Perkuatan Struktur dengan bahan FRP jenis e-glass per lapis pada daera M²

8.5.(1a)

Penggantian Baut Mutu Tinggi A325 Tipe 1 diameter M25

Bh

8.5.(6a)

Pengencangan Baut Biasa Grade A diameter M25

Bh

11,759.92

16.00

188,158.72

16.00

188,158.72

8.7.(1c)

Pengecatan struktur baja pada daerah kering tebal ……... Mikron



80,095.39

147.59

11,821,278.91

147.59

11,821,278.91

8.11.(1)

Penggantian dan Perbaikan Sambungan siar muai Tipe Asphaltic Plug



1,464,232.13

50.00

73,211,606.40

50.00

73,211,606.40

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

-

-

203,520,256.19

DIVISI 9. PEKERJAAN HARIAN

-

-

-

9.1.(1)

Mandor

Jam

19,040.48

28.00

533,133.44

35.00

666,416.80

171.00

3,255,922.08

-

234.00

4,455,472.32

9.1.(2)

Pekerja Biasa

Jam

13,860.00

112.00

1,552,320.00

140.00

1,940,400.00

171.00

2,370,060.00

-

423.00

5,862,780.00

9.1.(3)

Tukang Kayu, Tukang Batu, dsb

Jam

15,897.62

56.00

890,266.72

70.00

1,112,833.40

171.00

2,718,493.02

-

297.00

4,721,593.14

9.1.(4) a

Dump Truck, kapasitas 3 - 4 m³

Jam

304,898.21

28.00

8,537,149.94

35.00

10,671,437.42

75.00

22,867,365.90

-

138.00

42,075,953.26

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Jam

340,919.51

28.00

9,545,746.36

35.00

11,932,182.95

-

-

63.00

21,477,929.31

9.1.(11)

Alat Penggali (Excavator) 80 - 140 PK

Jam

573,619.51

28.00

16,061,346.40

35.00

20,076,683.01

-

-

63.00

36,138,029.41

Marka Jalan Termoplastik

M2

175,253.43

788.00

138,099,704.07

-

-

788.00

138,099,704.07

9.2(1)

-

203,520,256.19

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

-

175,219,666.93

-

-

46,399,953.58

31,211,841.00

-

-

252,831,461.52

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 10.1(1)

Galian Tanah untuk saluran air dan lereng

M3

37,671.06

381.87

14,385,448.71

2,816.04

106,083,219.37

-

3,197.91

120,468,668.08

10.1(2)

Timbunan Pilihan untuk lereng tepi saluran

M3

137,571.67

-

-

238.30

32,783,328.11

-

238.30

32,783,328.11

10.1(3)

Pasangan Batu dengan Mortar

M

3

632,042.91

-

-

120.72

76,300,220.23

-

120.72

76,300,220.23

10.1(4)

Lapis Pondasi Aggregat Klas A

M

3

561,605.73

74.85

42,036,188.82

756.68

424,955,823.09

-

831.53

466,992,011.91

10.1(6)

Lapis Pondasi Aggregat Klas S

M3

364,251.36

-

514.49

187,403,682.88

-

514.49

187,403,682.88

10.1(9)

Campuran Aspal Panas

M3

2,832,808.30

123,652,082.08

527.70

1,494,872,937.36

-

-

571.35

1,618,525,019.44

10.1(16)

Pasangan Batu

M3

688,665.98

-

-

87.20

60,051,673.48

-

-

87.20

60,051,673.48

10.1(18)

Perbaikan Rel Pengaman



76,435.51

-

-

1,000.00

76,435,510.50

-

-

1,000.00

76,435,510.50

43.65

PRESERVASI REKONSTRUKSI /REHABILITASI JALAN

MATA PEMBA YARAN UTAMA

URAIAN

STN

HARGA SATUAN (RUPIAH)

PRESERVASI PEMELIHARAAN RUTIN JALAN

PRESERVASI JEMBATAN

PRESERVASI RUTIN JEMBATAN TOTAL VOLUME

VOLUME

JUMLAH HARGA (RUPIAH)

VOLUME

180,073,719.62

JUMLAH HARGA (RUPIAH)

VOLUME

JUMLAH HARGA (RUPIAH)

VOLUME

JUMLAH HARGA (RUPIAH)

JUMLAH HARGA SATUAN (RUPIAH)

2,458,886,395.03

-

-

5,414,476.15

-

-

157.00

9,418,828.94

-

-

162.00

9,718,791.64

80,325.00

139,885,063.76

-

-

82,025.00

142,845,594.21

1,695,824,483.80

-

-

2,650,500.00

1,727,633,007.00

-

-

1.00

4,646,635.27

1.00

4,646,635.27

-

-

-

1.00

55,160,057.43

1.00

55,160,057.43

-

-

-

1.00

7,494,573.02

1.00

7,494,573.02

30,278,075.00

-

-

-

1.00

30,278,075.00

1.00

30,278,075.00

4,721,581.00

-

-

-

1.00

4,721,581.00

1.00

4,721,581.00

Ls

4,721,581.00

-

-

-

1.00

4,721,581.00

1.00

4,721,581.00

Ls

7,044,898.64

-

-

-

1.00

7,044,898.64

1.00

7,044,898.64

Pemeliharaan Kinerja Jembatan Sei Air Gadang A bentang 104,30 m

Ls

78,168,396.60

-

-

-

1.00

78,168,396.60

1.00

78,168,396.60

Pemeliharaan Kinerja Jembatan Air Geringging Sirah bentang 6,10 m

Ls

4,571,689.54

-

-

-

1.00

4,571,689.54

1.00

4,571,689.54

10.2(10)

Pemeliharaan Kinerja Jembatan Sungai Kampung Alang bentang 6,60 m

Ls

4,946,418.19

-

-

-

1.00

4,946,418.19

1.00

4,946,418.19

10.2(11)

Pemeliharaan Kinerja Jembatan Sungai Kasik Putih bentang 11,00 m

Ls

8,244,030.32

-

-

-

1.00

8,244,030.32

1.00

8,244,030.32

10.2(12)

Pemeliharaan Kinerja Jembatan Tambang Cubadak bentang 7,90 m

Ls

5,920,712.68

-

-

-

1.00

5,920,712.68

1.00

5,920,712.68

10.2(13)

Pemeliharaan Kinerja Jembatan Batang Tanah Periuk bentang 15,00 m

Ls

11,241,859.53

-

-

-

1.00

11,241,859.53

1.00

11,241,859.53

10.2(14)

Pemeliharaan Kinerja Jembatan Air Haji bentang 62,00 m

Ls

46,466,352.72

-

-

-

1.00

46,466,352.72

1.00

46,466,352.72

10.2(15)

Pemeliharaan Kinerja Jembatan Sungai Paraman Udang bentang 16,00

Ls

11,991,316.83

-

-

-

1.00

11,991,316.83

1.00

11,991,316.83

10.2(16)

Pemeliharaan Kinerja Jembatan Batang Bayang bentang 41,00 m

Ls

30,727,749.38

-

-

-

1.00

30,727,749.38

1.00

30,727,749.38

10.2(17)

Pemeliharaan Kinerja Jembatan Batang Sikabau bentang 83,50 m

Ls

62,579,684.72

-

-

-

1.00

62,579,684.72

1.00

62,579,684.72

10.2(18)

Pemeliharaan Kinerja Jembatan Batang Air Kalam bentang 25,70 m

Ls

19,261,052.66

-

-

-

1.00

19,261,052.66

1.00

19,261,052.66

10.2(19)

Pemeliharaan Kinerja Jembatan Batang Timah A bentang 103,80 m

Ls

77,793,667.95

-

-

-

1.00

77,793,667.95

1.00

77,793,667.95

10.2(20)

Pemeliharaan Kinerja Jembatan Batang Timah B bentang 104,80 m

Ls

78,543,125.25

-

-

-

1.00

78,543,125.25

1.00

78,543,125.25

10.2(21)

Pemeliharaan Kinerja Jembatan Tingkok bentang 40,40 m

Ls

30,278,075.00

-

-

-

1.00

30,278,075.00

1.00

30,278,075.00

10.2(22)

Pemeliharaan Kinerja Jembatan Batang Pertumpangan bentang 26,00 m

Ls

19,485,889.85

-

-

-

1.00

19,485,889.85

1.00

19,485,889.85

10.2(23)

Pemeliharaan Kinerja Jembatan Kinali bentang 31,90 m

Ls

23,907,687.93

-

-

-

1.00

23,907,687.93

1.00

23,907,687.93

10.2(24)

Pemeliharaan Kinerja Jembatan Paku bentang 16,00 m

Ls

11,991,316.83

-

-

-

1.00

11,991,316.83

1.00

11,991,316.83

10.2(25)

Pemeliharaan Kinerja Jembatan Pinagar bentang 26,60 m

Ls

19,935,564.23

-

-

-

1.00

19,935,564.23

1.00

19,935,564.23

10.2(26)

Pemeliharaan Kinerja Jembatan Tareh bentang 16,00 m

Ls

11,991,316.83

-

-

-

1.00

11,991,316.83

1.00

11,991,316.83

10.2(27)

Pemeliharaan Kinerja Jembatan Sungai Sarik bentang 26,80 m

Ls

20,085,455.69

-

-

-

1.00

20,085,455.69

1.00

20,085,455.69

10.2(28)

Pemeliharaan Kinerja JembatanSungai Ampu bentang 26,20 m

Ls

19,635,781.31

-

-

-

1.00

19,635,781.31

1.00

19,635,781.31

215,142,735.97

4,309,429,247.68

-

711,834,545.44

5,236,406,529.09

5,551,399,445.28

4,355,829,201.26

487,818,542.49

711,834,545.44

11,106,881,734.46

555,139,944.53

435,582,920.13

48,781,854.25

71,183,454.54

1,110,688,173.45

10.1(19)

Pembersihan Patok

Bh

41,331.88

-

10.1(20)

Pembersihan Rambu

Bh

59,992.54

5.00

299,962.71

10.1(21)

Pembersihan Drainase



1,741.49

1,700.00

2,960,530.45

10.1(22)

Pengendalian Tanaman pada Rumija



651.81

48,800.00

31,808,523.20

2,601,700.00

10.2(1)

Pemeliharaan Kinerja Jembatan Batang Air Desa Baru Bentang 6,20 m

Ls

4,646,635.27

-

10.2(2)

Pemeliharaan Kinerja Jembatan Batahan bentang73,60 m

Ls

55,160,057.43

10.2(3)

Pemeliharaan Kinerja Jembatan Batang Napal bentang 10,00 m

Ls

7,494,573.02

10.2(4)

Pemeliharaan Kinerja Jembatan Batang Taming bentang 40,40m

Ls

10.2(5)

Pemeliharaan Kinerja Jembatan Batang Tarok 1 bentang 6,30 m

Ls

10.2(6)

Pemeliharaan Kinerja Jembatan Batang Tarok 2 bentang 6,30 m

10.2(7)

Pemeliharaan Kinerja Jembatan Batang Tian bentang 9,40 m

10.2(8) 10.2(9)

Jumlah Harga Pekerjaan SPESIFIKASI KHUSUS 10.b (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

-

131.00

2,638,960,114.65 131.00

5,414,476.15

(A)

Jumlah Harga Pekerjaan (termasuk Biaya Umum dan Keuntungan)

(B)

Pajak Pertambahan Nilai (PPN) = 10% x (A)

(C)

Jumlah Total Harga Pekerjaan = (A) + (B)

6,106,539,389.80

4,791,412,121.38

536,600,396.74

783,017,999.98

12,217,569,907.90

(D)

Dibulatkan

6,106,539,300.00

4,791,412,100.00

536,600,300.00

783,017,900.00

12,217,569,900.00

Padang, 11 Februari 2019 Penawar , PT. CITRA PERMATA SULUNG

FARDI MUABAROK Direktur Utama

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 1.2 : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK =

No.

URAIAN

A.

Sewa Tanah

B.

PERALATAN Periksa lembar 1.2-2

C.

2.11 %

SATUAN

M2

1 2 3 4 5 6

MOBILISASI FASILITAS KONTRAKTOR Base Camp Kantor Barak Bengkel Gudang, dan lain-lain ......................

Ls Ls Ls Ls Ls ....

1

MOBILISASI FASILITAS LABORATORIUM Ruang Laboratorium

Set

2

Soil & Aggregate Testing

3

Bituminous Testing

4

Conccrete Testing

5

Pendukung

(Periksa Fasilitas Laboratorium)

6

Operasional

(Periksa Fasilitas Laboratorium)

D.

E. E.I. 1 2 3 4 5 6 E.II. 1 2 3 4 5 6

VOL.

Lembar 1.2-1 JUMLAH HARGA (Rp.)

0.00

-

1.00

107,799,360.00

107,799,360.00

1.00 1.00 1.00 1.00 1.00

21,250,000.00 17,000,000.00 12,750,000.00 12,750,000.00 8,500,000.00

21,250,000.00 17,000,000.00 12,750,000.00 12,750,000.00 8,500,000.00

-

-

-

MOBILISASI LAINNYA PEKERJAAN DARURAT Perkuatan Jembatan Lama Pemeliharaan Jalan Kerja / samping Papan Nama Proyek Mobilisasi Staf dan lain lain

Set

-

Bh Ls

-

......................

....

LAIN-LAIN Komunikasi Lapangan Lengkap Perabotan dan Pelayanan Papan Nama Proyek Mobilisasi Staf dan lain lain Sewa Kendaraan (roda empat) Double Cabin 4x4 Kendaraan Operasional lapangan (sepeda motor)

Set Ls Bh Ls Unit Unit

F.

Perhitungan Biaya SMK 3

Ls

G.

DEMOBILISASI

LS

Total Biaya Mobilisasi

HARGA SATUAN (Rp.)

16,000,000.00 12,000,000.00 1,200,000.00 6,000,000.00 36,000,000.00 4,800,000.00

-

-

1.00

53,899,680.00

53,899,680.00

233,949,040.00

Catatan :

Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

No.

B. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39

: 1.2 : MOBILISASI

JENIS ALAT

PERALATAN ASPHAL MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3.5 TON DUMP TRUCK 10 TON EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUISER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER WELDING SET TRONTON COLD MILLING MACHINE SLIP FORM PAVER CONCRETE PAN MIXER TRUK MIXER (AGITATOR) PAN MIXER ON TRUCK + SPADER BOX PICK UP GRASS CUTTER MOBIL PIK UP GRASS CUTTER WATER JET FLAT BED TRUCK WITH CRANE ASPHALT CUTTER

Total untuk Item B pada Lembar 1

KODE ALAT

E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E32 E35 E37 E42 E43 E49

E66 E67 E70 E71

SATUAN

Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit

VOL.

1.00 1.00 1.00 1.00 2.00 5.00 10.00 2.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00

1.00

1.00 4.00 1.00 1.00 2.00

HARGA SATUAN (Rp.)

44,767,200.00 2,508,800.00 408,800.00 360,000.00 360,000.00 260,000.00 310,240.00 2,508,800.00 408,800.00 2,508,800.00 2,508,800.00 2,508,800.00 2,508,800.00 2,508,800.00 2,508,800.00 80,000.00 27,590,400.00 80,000.00 408,800.00 408,800.00 80,000.00 80,000.00 1,656,000.00 236,960.00 40,000.00 80,000.00 463,200.00 120,000.00

Lembar 1.2-2 JUMLAH HARGA (Rp.)

44,767,200.00 2,508,800.00 408,800.00 360,000.00 720,000.00 1,300,000.00 3,102,400.00 5,017,600.00 408,800.00 2,508,800.00 2,508,800.00 2,508,800.00 2,508,800.00 5,017,600.00 2,508,800.00 160,000.00 27,590,400.00 80,000.00 408,800.00 408,800.00 80,000.00 80,000.00 1,656,000.00 236,960.00 160,000.00 80,000.00 463,200.00 240,000.00 107,799,360.00

Analisa El - 18.1

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 1.8.(1) : Manajemen dan Keselamatan Lalu Lintas : Lump Sum

No.

URAIAN

SATUAN

A. 1 2 3 4 5

DATA DAN ASUMSI Panjang Lokasi Pekerjaan Total Masa Pelaksanaan Kegiatan Masa Mobilisasi Periode Pemeliharaan dan Perlindungan Lalin Panjang zona pekerjaan jalan

B. 1

4 5

URUTAN KERJA Penyedia menyiapkan perlengkapan keselamatan jalan selama periode konstruksi sesuai ketentuan Buat rencana kerja manajemen lalu-lintas sesuai schedule pekerjaan dan koordinasikan dengan seluruh personil yang terkait Kelompok kerja pengatur lalu-lintas selama konstruksi menggunakan tenaga pengatur dan flagman dengan 3 shift Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait Semua rambu harus jelas dan terbaca oleh Pengguna Jalan

C. 1 2 3 4 5 6 7 8 9 10 11 12

PERALATAN KESELAMATAN LALU LINTAS Rambu panah berkedip Rambu suar berkedip portabel Rambu tetap informasi pengalihan/pengaturan lalu lintas Rambu portabel informasi pengalihan/pengaturan lalu lintas Rambu penghalang lalu-lintas jenis plastik Rambu penghalang lalu-lintas jenis beton Rambu Peringatan Rambu Petunjuk Barikade Kayu 1/2 lebar jalan Marka jalan sementara (jika diperlukan)/Police Line Peralatan komunikasi dan Lainnya Alat Bantu

D.

TENAGA / PERSONIL

1

Pekerja (Flagman)

OB

2

Koordinator / Pengatur

OB

E

TOTAL BIAYA MANAJEMEN DAN KESELAMATAN LALU LINTAS

2 3

KM Hari Bulan Bulan M

Buah Buah Buah Buah Buah Buah Buah Buah M' Rol Set Ls

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

: : :

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

67.65 11.00 2.00 6.00 2,000.00

-

-

-

12.00

85,000.00

1,020,000.00

20.00 8.00 2.00 4.00

140,000.00 140,000.00 200,000.00 110,000.00

2,800,000.00 1,120,000.00 400,000.00 440,000.00

2,100,000.00

25,200,000.00

1.00

12.00

Catatan :1Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN), Asuransi Tenaga Kerja dan pengeluaran lainnya. 2Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas 3Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang

30,980,000.00

diperlukan seperti material habis pakai baterai, lampu dan sebagainya

Analisa El - 1.19

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 1.19 : Keselamatan dan Kesehatan Kerja : Lump Sum

No.

A. 1

URAIAN

DATA DAN ASUMSI Pengadaan peralatan Keselamatan dan Kesehatan Kerja sederhana dan perlengkapan perangkat alat tulis dan kantor Jasa Pengendalian Keselamatan dan Kesehatan Kerja berada di lapangan selama masa pelaksanaan pekerjaan Personil melakukan pengendalian Keselamatan dan Kesehatan Kerja berdasarkan spesifikasi pekerjaan dan membuat laporan Manajemen Keselamatan dan Kesehatan Kerja sesuai ketentuan Ditjen Bina Marga

SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

Ls

1.00

Masa Pelaksanaan Pekerjaan

Bln

11.00

1

Ahli Keselamatan dan Kesehatan Kerja

OB

2

Asisten Ahli Keselamatan dan Kesehatan Kerja

OB

3

Staff Pendukung (supporting Staff)

OB

4

Laporan Keselamatan dan Kesehatan Kerja

E

TOTAL BIAYA MANAJEMEN DAN KESELAMATAN LALU LINTAS

2 3 4

B. 1

4 5

URUTAN KERJA Penyedia setelah menerima SPMK mengusulkan personil Tenaga Ahli K3 sebagai Manajer Keselamatan dan Kesehatan Kerja Tenaga Ahli dibantu oleh Asisten Keselamatan dan Kesehatan Kerja berpengalaman dibidangnya dan tenaga pendukung Membuat RMK dan laporan Keselamatan dan Kesehatan Kerja yang disetujui PPK Melakukan pengendalian Keselamatan dan Kesehatan Kerja semua pekerjaan dan membuat laporan secara berkala

C.

TENAGA / PERSONIL

2 3

Bulan

HARGA SATUAN (Rp.)

: : : JUMLAH HARGA (Rp.)

30,000,000.00

30,000,000.00

11.00

7,500,000.00

82,500,000.00

11.00

5,000,000.00

55,000,000.00

1,000,000.00

11,000,000.00

11.00

Catatan :1Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN), Asuransi Tenaga Kerja dan pengeluaran lainnya. 2Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas 3Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang diperlukan seperti material habis pakai baterai, lampu dan sebagainya

178,500,000.00

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

URAIAN

I. 1 2 3 4 5 6 II. 1 2 3 4 III.

: 2.1.(1) : Galian untuk Selokan Drainase dan Saluran Air : M3

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi Jalan : baik Jam kerja efektif per-hari Faktor pengembangan bahan Berat volume bahan URUTAN KERJA Penggalian dilakukan dengan menggunakan Excavator Selanjutnya Excavator menuangkan material hasil galian kedalam Dump Truck Dump Truck membuang material hasil galian keluar lokasi jalan sejauh Sekelompok pekerja akan merapikan hasil galian

URAIAN ANALISA HARGA SATUAN

KOEF.

SATUAN

Tk Fk D

7.00 jam 1.20 1.60 Ton/M3

L

0.50

Km

(E10) V Fb Fa

0.93 0.80 0.83

M3 -

Ts1 T1 T2 Q1

1.25 0.50 0.75 35.57

menit menit menit M3

-

0.0281

Jam

3.50 0.83 30.00 50.00

ton Km/Jam Km/Jam

3.69 1.00 0.60 1.50 6.79

menit menit menit menit menit

Q2

13.37

M3

-

0.0748

Jam

KETERANGAN

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN Tidak ada bahan yang diperlukan

2. 2.a.

ALAT EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus = T1 + T2 - Menggali, memuat dan berputar - Lain lain Kap. Prod. / jam =

Koefisien Alat / M3 2.b.

KODE

Analisa EI-211

DUMP TRUCK Kaasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus : - Muat - Waktu tempuh isi - Waktu tempuh kosong - Lain-lain

V x Fb x Fa x 60 x Fk Ts1 = 1 : Q1

= (V x 60)/ D x Q1 = (L : v1) x 60 = (L : v2) x 60

Kapasitas Produksi / Jam =

Koefisien Alat / M3

V x Fa x 60 D x Fk x Ts2 = 1 : Q2

(E08) V Fa v1 v2 Ts2 T1 T2 T3 T4

Faktor Konversi masuk dalam waktu siklus disesuaikan dgn lapangan

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

2.d.

3.

: 2.1.(1) : Galian untuk Selokan Drainase dan Saluran Air : M3

URAIAN

KODE

Analisa EI-211 URAIAN ANALISA HARGA SATUAN Lanjutan KOEF.

SATUAN

ALAT BANTU Diperlukan alat-alat bantu kecil - Sekop - Keranjang + Sapu TENAGA Produksi menentukan : EXCAVATOR Produksi Galian / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor

Q1 Qt

35.57 248.98

M3/Jam M3

P M

4.00 1.00

orang orang

0.1125 0.0281

Jam Jam

Koefisien tenaga / M3 : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

41,080.75 / M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M3

(L01) (L03)

KETERANGAN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 2.1.(1) : Galian untuk Selokan Drainase dan Saluran Air : M3

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

jam jam

0.1125 0.0281

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp. )

12,600.00 17,309.52

1,416.96 486.64

JUMLAH HARGA TENAGA B.

: : :

1,903.60

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Excavator Dump Truck Alat Bantu

(E10) (E08)

jam jam Ls

0.0281 0.0748 1.0000

521,472.29 277,180.19 50.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

-

14,660.80 20,731.73 50.00

35,442.53 37,346.13 3,734.61 41,080.75

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

URAIAN

I. 1 2 3 4 5 6 7

8

II. 1 2 3 III. 1. 1.a. 1.b. 1.c. 2. 2.a.

ASUMSI Menggunakan alat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Bahan dasar (batu, pasir dan semen) diterima seluruhnya di lokasi pekerjaan Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Perbandingan Pasir & Semen

Analisa EI-221 URAIAN ANALISA HARGA SATUAN

KODE

: - Volume Semen : - Volume Pasir

Perbandingan Batu & Mortar : - Batu - Mortar (campuran semen & pasir) Berat Jenis Bahan : - Pasangan Batu Dengan Mortar - Batu - Adukan (mortar) - Pasir - Semen Portland

KOEF.

L Tk Sm Ps

70.0 7.00 20 80

Bt Mr

60 40

D1 D2 D3 D4 D5

2.40 1.60 1.80 1.67 1.44

SATUAN

KETERANGAN

KM jam % %

Kuat Tekan min. 50 kg/cm2

% % ton/M3 ton/M3 ton/M3 ton/M3 ton/M3

URUTAN KERJA Semen, pasir dan air dicampur dan diaduk menjadi mortar dengan menggunakan alat bantu Batu dibersihkan dan dibasahi seluruh permukaannya sebelum dipasang Penyelesaian dan perapihan setelah pemasangan PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 x {D5 x (1000)} Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 ALAT CONCRETE MIXER Kapasitas Alat Faktor Efisiensi Alat Waktu siklus : (T1 + T2 + T3 + T4) - Memuat - Mengaduk - Menuang - Menunggu, dll. Kap. Prod. / jam = Koefisien Alat / M3

2.a.

: 2.2.(1) : Pasangan Batu dengan Mortar : M3

ALAT BANTU Diperlukan : - Sekop - Pacul - Sendok Semen - Ember Cor - Gerobak Dorong

V x Fa x 60 1000 x Ts1 = 1 : Q1

(M02)

M3

(M12) (M01)

1.1 0.1120 176 0.4829

(E06) V Fa

500.00 0.83

Liter -

T1 T2 T3 T4 Ts1 Q1

5.00 3.00 1.00 1.00 10.00 2.490

menit menit menit menit menit M3

(E06)

0.4016

jam

Kg M3

Lump Sum = = = = =

4 4 4 8 3

buah buah buah buah buah

Lepas

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

3.

: 2.2.(1) : Pasangan Batu dengan Mortar : M3

URAIAN

URAIAN ANALISA HARGA SATUAN Lanjutan KODE

TENAGA Produksi Pas. Batu yang menentukan Produksi Pasangan Batu dalam 1 hari = Tk x Q1 Kebutuhan tenaga :

Analisa EI-221

( Prod. C. Mixer )

- Mandor - Tukang Batu - Pekerja

KOEF.

SATUAN

Q1 Qt

2.49 17.43

M3/Jam M3

M Tb P

1.00 4.00 12.00

orang orang orang

(L03) (L02) (L01)

0.4016 1.6064 4.8193

jam jam jam

Koefisien Tenaga / M3 : - Mandor - Tukang - Pekerja

= (Tk x M) : Qt = (Tk x Tb) : Qt = (Tk x P) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

0.00 / M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M3

KETERANGAN

Analisa EI-221 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 2.2.(1) : Pasangan Batu dengan Mortar : M3

NO

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Batu Mandor

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

4.8193 1.6064 0.4016

: : :

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp. )

12,600.00 14,452.38 17,309.52

60,722.89 23,216.68 6,951.62

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Batu Semen (PC) Pasir

(M02) (M12) (M01)

M3 zak M3

1.0800 176.0000 0.4829

90,891.18

165,000.00 1,240.00 110,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Conc. Mixer Alat Bantu

(E06)

jam Ls

0.4016 1.0000

449,556.17

84,752.41 100.00

UMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

178,200.00 218,240.00 53,116.17

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

34,037.11 100.00

34,137.11 574,584.46 57,458.45 632,042.91

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

1 2 3 4 5 6 II. 1 2 3 4

KODE

KOEF.

SATUAN

Tk Fk D

7.00 1.20 1.60

Jam ton/m3

URUTAN KERJA Tanah yang dipotong umumnya berada disisi jalan Penggalian dilakukan dengan menggunakan Excavator Selanjutnya Excavator menuangkan material hasil galian kedalam Dump Truck Dump Truck membuang material hasil galian keluar lokasi jalan sejauh

L

1.50

Km

0.93 1.00 0.83 0.90

M3 -

KETERANGAN

1.40 - 1.80

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Tidak ada bahan yang diperlukan

2. 2.a.

ALAT EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Faktor konversi , kedalaman < 40 % Waktu siklus - Menggali , memuat - Lain lain Waktu siklus = T1 x Fv Kap. Prod. / jam =

Koefisien Alat / M3 DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat - Waktu tempuh isi - Waktu tempuh kosong - Lain-lain

V x Fb x Fa x 60 x Fk Ts1 = 1 : Q1

= (V x 60)/(D x Q1 ) = (L : v1) x 60 = (L : v2) x 60

Kapasitas Produksi / Jam = Koefisien Alat / M3 2.d.

URAIAN ANALISA HARGA SATUAN

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi Jalan : baik Jam kerja efektif per-hari Faktor pengembangan bahan Berat volume tanah (lepas)

1.

2.b.

Analisa EI-311a

URAIAN

I.

III.

: 3.1.(1a) : Galian Biasa : M3

ALAT BANTU Diperlukan alat-alat bantu kecil - Sekop

V x Fa x 60 D x Fk x Ts2 = 1 : Q2

(E10) V Fb Fa Fv Ts1 T1 T2 Ts1

0.500 0.400 0.90

menit menit menit menit

Q1

61.75

M3/Jam

(E10)

0.0162

Jam

3.50 0.83 30.00 35.00 2.13 3.00 2.57 1.00 8.70

ton KM/Jam KM/Jam menit menit menit menit menit menit

Q2

10.44

M3/Jam

(E08)

0.0958

Jam

(E08) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

Faktor konversi dihapus, masuk dalam waktu siklus disesuaikam

Lump Sump

- Keranjang

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 3.1.(1a) : Galian Biasa : M3

No.

3.

Analisa EI-311a URAIAN ANALISA HARGA SATUAN Lanjutan

URAIAN

KODE

TENAGA Produksi menentukan : EXCAVATOR Produksi Galian / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor

KOEF.

Q1 Qt

61.75 432.26

P M

4.00 1.00

SATUAN

M3/Jam M3 orang orang

Koefisien tenaga / M3 : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

37,671.06 / M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M3

(L01) (L03)

0.0648 0.0162

Jam Jam

KETERANGAN

Analisa EI-311a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 3.1.(1a) : Galian Biasa : M3

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

B.

SATUAN

(L01) (L03)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN HARGA SATUAN KUANTITAS (Rp.)

Jam Jam

0.0648 0.0162

12,600.00 17,309.52

: : :

JUMLAH HARGA (Rp. )

816.17 280.31

JUMLAH HARGA TENAGA

1,096.47

JUMLAH HARGA BAHAN

0.00

BAHAN

C.

PERALATAN

1. 2. 3.

Excavator Dump Truck Alat Bantu

(E10) (E08)

Jam Jam Ls

0.0162 0.0890 1.0000

521,472.29 277,180.19 50.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

2

3 4

8,444.62 24,655.32 50.00

33,149.95 34,246.42 3,424.64 37,671.06

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

URAIAN

I. 1 2 3 4 5 6 7 8 II. 1 2 3

III.

: 3.1.(9). : Galian Perkerasan Berbutir : M3

URUTAN KERJA Perkerasan beton yg dibongkar umumnya adalah perkerasan jalan Pembongkaran dilakukan dengan Jack Hammer dan ganco kemudian dimuat ke dalam truck secara manual. Dump Truck membuang material hasil galian keluar diluar lokasi pekerjaan atau sesuai perintah Direksi

KOEF.

SATUAN

Tk Fk t D

7.00 Jam 1.20 0.30 M 2.40 Ton/M3 0

L

3.00

Km

bk Fa Q1

6.50 0.83 2.298

menit/m2

(E05/260

0.4351

Jam

3.50 0.83 25.00 30.00

M3 KM/Jam KM/Jam

31.72 7.20 6.00 3.00 47.92

menit menit menit menit menit

3.64

M3 / Jam

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Tidak ada bahan yang diperlukan

2. 2.a.

ALAT JACK HAMMER + AIR COMPRESSOR Kapasitas bongkar Effesiensi kerja Kapa. Prod/jam = Fa x t x 60 bk Koefisien Alat / m3 = 1 : Q1 DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat - Waktu tempuh isi - Waktu tempuh kosong - Lain-lain

= (V x 60)/(D x Q1 x Fk) = (L : v1) x 60 = (L : v2) x 60

Kapasitas Produksi / Jam = Koefisien Alat / m3 3.

URAIAN ANALISA HARGA SATUAN

KODE

ASUMSI Pekerjaan dilakukan secara mekanik/manual Lokasi pekerjaan : sepanjang jalan Kondisi Jalan : sedang/rusak Jam kerja efektif per-hari Faktor pengembangan bahan Tebal perkerasan beton Berat volume perkerasan beton Memakai Drill Breaker ( yes = 1 , No = 0 )

1.

2.b.

Analisa EI-319

V x Fa x 60 Ts1 = 1 : Q2

TENAGA Produksi menentukan : JACK HAMMER Produksi Galian / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor

(E08) V Fa v1 v2 Ts1 T1 T2 T3 T4 Ts1 Q2

M3

(E08)

0.2750

Jam

Q1 Qt

6.50 45.50

M3/Jam M3

P M

8.00 1.00

orang orang

Koefisien tenaga / M3 : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

(L01) (L03)

1.2308 0.1538

Jam Jam

KETERANGAN

Berlanjut ke halaman berikut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 3.1.(9). : Galian Perkerasan Berbutir : M3

No.

URAIAN

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

205,544.20 / M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M3

Analisa EI-319 URAIAN ANALISA HARGA SATUAN Lanjutan KODE

KOEF.

SATUAN

KETERANGAN

Analisa EI-319 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 3.1.(9). : Galian Perkerasan Berbutir : M3

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

B.

SATUAN

(L01) (L03)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN HARGA SATUAN KUANTITAS (Rp.)

Jam Jam

1.2308 0.1538

12,600.00 17,309.52

: : :

59.28 12,184,660.20 0.00

JUMLAH HARGA (Rp. )

15,507.69 2,663.00

JUMLAH HARGA TENAGA

18,170.70

JUMLAH HARGA BAHAN

0.00

BAHAN

C. 1. 2. 3.

PERALATAN Jack Hammer Compresor Dump Truck

E26 E05 E08

Jam Jam Jam

0.4351 0.4351 0.2750

36,099.04 176,454.51 277,180.19

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

2

3 4

15,705.74 76,770.70 76,211.22

168,687.67 186,858.36 18,685.84 205,544.20

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 3.2.(1a) : Timbunan Biasa Dari Sumber Galian : M3

URAIAN

I. 1 2 3 4 5 6 7 II. 1 2 3 4 5

Analisa EI-321 URAIAN ANALISA HARGA SATUAN

KODE

ASUMSI Pekerjaan dilakukan secara mekanis Lokasi pekerjaan : sepanjang jalan Kondisi Jalan : baik Jam kerja efektif per-hari Faktor pengembangan bahan (padat ke asli) Tebal hamparan padat Berat volume bahan (lepas) URUTAN KERJA Excavator menggali dan memuat ke dalam dump truck Dump Truck mengangkut ke lapangan dengan jarak dari sumber galian ke lapangan Material diratakan dengan menggunakan Motor Grader Material dipadatkan menggunakan Vibratory Roller Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level permukaan dengan menggunakan alat bantu

7.00 1.11 0.15 1.60

Jam M Ton/M3

L

2.00

Km

1.11

M3

0.93 1.00 0.83 0.90

M3 -

1.00 0.50 1.50

menit menit menit

Q1

27.79

M3

(E10)

0.0360

Jam

3.50 0.83 1.25 20.00 30.00

Ton KM/Jam KM/Jam

4.26 6.00 4.00 0.50 14.76

menit menit menit menit menit

5.91

M3

0.1693

Jam

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Bahan timbunan = 1 x Fv

(M08)

2. 2.a.

ALAT WHEEL LOADER Kapasitas Bucket Faktor Bucket Faktor Efisiensi Alat Faktor Konversi asli ke padat Waktu sklus - Menggali, memuat - Lain lain Waktu Siklus = T1 x Fv

(E15) V Fb Fa Fv1 Ts1 T1 T2 Ts1

Koefisien alat / M3 2.b.

V x Fb x Fa xFv1x 60 Ts1 = 1 : Q1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Faktor Konversi asli ke lepas Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktusiklus : - Waktu muat = = (V x 60)/(D x Fk x Q1) - Waktu tempuh isi = (L : v1) x 60 - Waktu tempuh kosong = (L : v2) x 60 - Lain-lain

Kapasitas Produksi / Jam =

Koefisien Alat / M3

V x Fa x 60 D x Fv2 x Ts2 = 1 : Q2

SATUAN

Tk Fv t D

III. 1. 1.a.

Kapasitas Produksi / Jam =

KOEF.

(E08) V Fa Fv2 v1 v2 Ts2 T1 T2 T3 T4 Ts2 Q2

(E08)

KETERANGAN

kondisi padat

Berlanjut ke halaman berikut ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 3.2.(1a) : Timbunan Biasa Dari Sumber Galian : M3

No.

2.c.

2.d.

MOTOR GRADER Panjang hamparan Lebar Overlap Faktor Efisiensi kerja Kecepatan rata-rata alat Jumlah lintasan Jumlah lajur lintasan Lebar pisau effektif Waktu siklus - Perataan 1 kali lintasan - Lain-lain

3.

KODE

(E13) Lh bo Fa v n N b Ts3 T1 T2 Ts3

Lh x 60 v x 1000

Kapasitas Prod / Jam =

x (N(b-bo)+bo) x t x Fa x 60 Ts3 x n

Koefisien Alat / M3

= 1 : Q3

VIBRATOR ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Lajur lintasan Lebar Overlap Faktor efisiensi alat (v x 1000) x (N(b-bo)+bo) x t x Fa n

Koefisien Alat / M3

2.e.

URAIAN ANALISA HARGA SATUAN Lanjutan

URAIAN

Kapasitas Prod./Jam =

2.e.

Analisa EI-321

= 1 : Q4

WATER TANK TRUCK Volume tangki air Kebutuhan air/M3 material padat Kapasitas pompa air Faktor efisiensi alat Kapasitas Prod./Jam =

pa x Fa x 60 1000 x Wc

Koefisien Alat / M3

= 1 : Q5

KOEF.

SATUAN

50.00 0.30 0.83 4.00 1 1.00 2.6

M M Km / Jam lintasan

0.75 2.00 2.75

menit menit menit

KETERANGAN

M

Q3

353.13

M3

(E13)

0.0028

Jam

(E19) v b n N bo Fa

4.00 1.48 8.00 3.00 0.30 0.83

Km / Jam M lintasan M -

Q4

239.04

M3

(E19)

0.0042

Jam

(E32) V Wc pa Fa

5.00 M3 0.07 M3 200.00 liter/menit 0.83

Q5

142.29

M3

0.0070

jam

ALAT BANTU Diperlukan alat-alat bantu kecil - Sekop = 3 buah

Lump Sump

TENAGA Produksi menentukan : EXCAVATOR Produksi Timbunan / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor

Q1 Qt

27.79 194.52

P M

3.00 1.00

M3/Jam M3 orang orang

Berlanjut ke halaman berikut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 3.2.(1a) : Timbunan Biasa Dari Sumber Galian : M3

No.

URAIAN

Analisa EI-321 URAIAN ANALISA HARGA SATUAN Lanjutan KODE

KOEF.

SATUAN

Koefisien tenaga / M3 : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

71,374.24 / M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 17.40 M3

(L01) (L02)

0.1080 0.0360

Jam Jam

KETERANGAN

Analisa EI-321 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 3.2.(1a) : Timbunan Biasa Dari Sumber Galian : M3

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L02)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN HARGA SATUAN KUANTITAS (Rp.)

Jam Jam

0.1080 0.0360

12,600.00 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1.

Bahan timbunan (M08)

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6.

PERALATAN Wheel Loader Dump Truck Motor Grader Vibro Roller Water tank truck Alat Bantu

(E15) (E08) (E13) (E19) (E23)

Jam Jam Jam Jam Jam Ls

0.0360 0.1693 0.0028 0.0042 0.0070 1.0000

309,926.83 277,180.19 440,813.67 408,609.96 257,973.69 50.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

2

3 4

: : :

17.40 1,241,911.75 0.01

JUMLAH HARGA (Rp. )

1,360.28 622.90

1,983.18

-

11,153.10 46,928.62 1,248.31 1,709.38 1,813.07 50.00

62,902.49 64,885.67 6,488.57 71,374.24

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 3.2.(2a) : Timbunan Pilihan Dari Sumber Galian : M3

URAIAN

I. 1 2 3 4 5 6 7 8 II. 1 2 3 4

5

Analisa EI-322 URAIAN ANALISA HARGA SATUAN

KODE

ASUMSI Pekerjaan dilakukan secara mekanis Lokasi pekerjaan : sepanjang jalan Kondisi Jalan : baik Jam kerja efektif per-hari Faktor pengembangan bahan Faktor pengembangan bahan (padat ke asli) Tebal hamparan padat Berat volume bahan (lepas) URUTAN KERJA Whell Loader memuat ke dalam Dump Truck Dump Truck mengangkut ke lapangan dengan jarak sumber galian ke lapangan Material dihampar dengan menggunakan Motor Grader Hamparan material disiram air dengan Watertank Truck (sebelum pelaksanaan pemadatan) dan dipadatkan dengan menggunakan Tandem Roller Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level permukaan dengan menggunakan alat bantu

KOEF.

SATUAN

Tk Fk Fv t D

7.00 1.20 1.11 0.15 1.60

Jam M Ton/M3

L

3.00

Km

1.11

M3

III. 1. 1.a.

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Bahan pilihan = 1 x Fv

(M09)

2. 2.a.

ALAT WHEEL LOADER Kapasitas Bucket Faktor Bucket Faktor Efisiensi Alat Faktor Konversi asli ke padat Waktu sklus - Menggali, memuat - Lain lain Waktu Siklus = T1 x Fv Kapasitas Produksi / Jam =

(E15) V Fb Fa Fv1 Ts1 T1 T2 Ts1 Q1

0.93 1.00 0.83 0.90

M3 -

1.00 0.50 1.50 27.79

menit menit menit M3

(E10)

0.0360

Jam

3.50 0.83 1.25 20.00 30.00

Ton KM/Jam KM/Jam

3.94 9.00 6.00 0.50 19.44 4.48

menit menit menit menit menit M3

0.2230

Jam

Koefisien alat / M3 2.b.

V x Fb x Fa xFv1x 60 Ts1 = 1 : Q1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Faktor Konversi asli ke lepas Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktusiklus : - Waktu muat = = (V x 60)/(D x Fk x Q1) - Waktu tempuh isi = (L : v1) x 60 - Waktu tempuh kosong = (L : v2) x 60 - Lain-lain Kapasitas Produksi / Jam =

Koefisien Alat / M3

V x Fa x 60 D x Fv2 x Ts2 = 1 : Q2

(E08) V Fa Fv2 v1 v2 Ts2 T1 T2 T3 T4 Ts2 Q2

(E08)

KETERANGAN

Berlanjut ke halaman berikut ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 3.2.(2a) : Timbunan Pilihan Dari Sumber Galian : M3

No.

2.c.

2.d.

URAIAN

MOTOR GRADER Panjang hamparan Lebar Efektif kerja Blade Lebar overlap Faktor Efisiensi Alat Kecepatan rata-rata alat Jumlah lintasan Jumlah lajur lintasan Waktu siklus - Perataan 1 kali lintasan - Lain-lain

2.e.

x (N(b-bo)+bo) x t x Fa x 60 Ts3 x n

Koefisien Alat / m3

= 1 : Q3

(v x 1000) x (N(b-bo)+bo) x t x Fa n = 1 : Q4

WATER TANK TRUCK Volume tangki air Kebutuhan air / M3 material padat Kapasitas pompa air Faktor efisiensi alat Kapasitas Produksi / Jam =

Koefisien Alat / m3 2.f.

3.

(E13) Lh b bo Fa v n N Ts3 T1 T2 Ts3

Kapasitas Produksi/Jam =

Koefisien Alat / m3

pa x Fa x 60 1000 x Wc = 1 : Q5

URAIAN ANALISA HARGA SATUAN Lanjutan KODE

= Lh : (v x 1000) x 60

TANDEM Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Jumlah lajur lintasan Lebar overlap Waktu siklus Faktor efisiensi alat Kapasitas Prod./Jam =

Analisa EI-322

KOEF.

SATUAN

50.00 2.60 0.30 0.80 4.00 4.00 2.00

m m m Km / Jam lintasan

0.75 2.00 2.75

menit menit menit

Q3

160.36

M3

(E13)

0.0062

Jam

(E17) v b n N bo Ts3 Fa Q4

1.50 1.48 8.00 2.00 0.30

Km / jam M lintasan

0.83 62.09

M3

(E17)

0.0161

Jam

(E23) V Wc pa Fa

4.00 0.07 200.00 0.83

M3 M3 liter/menit -

Q5

142.29

M3

(E23)

0.0070

Jam

Panduan

m

ALAT BANTU Diperlukan alat-alat bantu kecil - Sekop = 3 buah TENAGA Produksi menentukan : DUMP TRUCK Produksi Timbunan / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor

KETERANGAN

Lump Sump

Q1 Qt

4.48 31.39

M3/Jam M3

P M

4.00 1.00

orang orang

Berlanjut ke halaman berikut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 3.2.(2a) : Timbunan Pilihan Dari Sumber Galian : M3

No.

URAIAN

Analisa EI-322 URAIAN ANALISA HARGA SATUAN Lanjutan KODE

KOEF.

SATUAN

Koefisien tenaga / M3 : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

137,571.67 / M3.

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : . . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 44.68 M3

(L01) (L03)

0.8921 0.2230

Jam Jam

KETERANGAN

Analisa EI-322 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 3.2.(2a) : Timbunan Pilihan Dari Sumber Galian : M3

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN HARGA SATUAN KUANTITAS (Rp.)

Jam Jam

0.8921 0.2230

12,600.00 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1.

Bahan pilihan

(M09)

M3

1.1100

25,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 3. 4. 5.

PERALATAN Wheel Loader Dump Truck Motor Grader Tandem Water Tanker Alat Bantu

(E15) (E08) (E13) (E17) (E23)

Jam Jam Jam Jam Jam Ls

0.0360 0.2230 0.0062 0.0161 0.0070 1.0000

309,926.83 277,180.19 440,813.67 287,721.97 257,973.69 50.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

2

3 4

: : :

44.68 6,146,702.06 0.06

JUMLAH HARGA (Rp. )

11,240.09 3,860.33

15,100.42

27,750.00

27,750.00

11,153.10 61,816.10 2,748.84 4,633.62 1,813.07 50.00

82,214.73 125,065.15 12,506.52 137,571.67

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

URAIAN

I. 1 2 3 4 5 6 7 8

9

II. 1 2 3 4

III. 1.

2. 2.a.

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal lapis agregat padat Berat isi padat Jam kerja efektif per-hari Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm - Fraksi lolos Scalping Screen 0 - 5 mm Berat Isi Agregat (lepas) Faktor kehilangan - Agregat A

Analisa EI-511 URAIAN ANALISA HARGA SATUAN

KODE

L t Bip Tk 20-30 5-10&10-20 PU Bil Fh1

KOEF.

70.00 0.15 1.81 7.00 28.00 42.00 30.00 1.51 1.05

SATUAN

KM M jam % % % ton/m3

KETERANGAN

Gradasi harus memenuhi Spec.

URUTAN KERJA Wheel Loader memuat Agregat campuran ke dalam Dump Truck di Base Camp Dump Truck mengangkut Agregat kelas A ke lokasi pekerjaan dan dihampar dengan Motor Grader Hamparan Agregat dibasahi dengan Water Tank Truck sebelum dipadatkan dengan Tandem Roller Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparan dan level permukaan dengan menggunakan Alat Bantu PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN - Agregat A = 1 M3 x (Bip/Bil) x Fh ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Memuat dan lain-lain Kap. Prod. / jam =

Koefisien Alat / M3 2.b.

: 5.1.(1) : Lapis Pondasi Agregat Kelas A : M3

V x Fb x Fa x 60 Ts1 x Bip/Bil = 1 : Q1

DUMP TRUCK Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu Siklus : - Waktu memuat = V x 60/Q1 x Bil - Waktu tempuh isi = (L : v1) x 60 menit - Waktu tempuh kosong = (L : v2) x 60 menit - lain-lain Kap. Prod. / jam =

Koefisien Alat / M3

V x Fa x 60 Ts2 x Bip = 1 : Q2

(M26)

###

M3

(E15) V Fb Fa

1.50 0.85 0.83

M3 -

Ts1 Q1

0.45 117.71

menit M3

(E15)

0.0085

jam

(E09) V Fa v1 v2

25.00 0.80 30.00 45.00

ton KM/jam KM/jam

T1 T2 T3 T4 Ts2 Q2

8.44 140.00 93.33 2.00 243.77 2.72

menit menit menit menit menit M3

(E08)

0.3677

jam

(lepas) kondisi sedang

panduan

Berlanjut ke hal. berikut ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 5.1.(1) : Lapis Pondasi Agregat Kelas A : M3

No.

2.c.

2.d.

URAIAN

MOTOR GRADER Panjang hamparan Lebar efektif kerja blade Faktor Efisiensi alat Kecepatan rata-rata alat Jumlah lintasan Lajur lintasan Lebar Overlap Waktu Siklus : - Perataan 1 lintasan = Lh : (v x 1000) x 60 - Lain-lain

Kap. Prod. / jam =

Lh x (N(b-bo)+bo) x t x Fa x 60 n x Ts3

Koefisien Alat / M3

= 1 : Q3

TANDEM ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Jumlah lajur lintasan Lebar overlap Faktor Efisiensi alat Kap. Prod. / jam = Koefisien Alat / M3

2.e.

WATER TANK TRUCK Volume tanki air Kebutuhan air / M3 agregat padat Kapasitas pompa air Faktor Efisiensi alat Kap. Prod. / jam = Koefisien Alat / M3

2.g.

3.

(v x 1000) x (N(b-bo)+bo) x t x Fa n = 1 : Q4

ALAT BANTU Diperlukan : - Kereta dorong - Sekop - Garpu

pa x Fa x 60 1000 x Wc = 1 : Q5

Analisa EI-511 URAIAN ANALISA HARGA SATUAN Lanjutan KODE

(E13) Lh b Fa v n N bo Ts3 T1 T2 Ts3

KOEF.

SATUAN

50.00 2.40 0.83 4.00 6.00 3.00 0.30

M M KM/jam lintasan

0.75 1.00 1.75

menit menit menit

KETERANGAN

1 x pp

M

Q3

234.77

M3

(E13)

0.0043

jam

(E17) v b n N bo Fa

1.50 1.20 6.00 3.00 0.30 0.83

KM/jam M lintasan

Q4

74.70

M3

(E19)

0.0134

jam

(E23) V Wc pa Fa

4.00 0.07 100.00 0.83

M3 M3 liter/menit -

Q5

71.14

M3

(E23)

0.0141

jam

m -

Lump Sum = 2 buah. = 3 buah. = 2 buah.

TENAGA Produksi menentukan : WHEEL LOADER Produksi agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor

Q1 Qt

117.71 823.99

P M

7.00 1.00

M3/jam M3 orang orang

Berlanjut ke hal. berikut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 5.1.(1) : Lapis Pondasi Agregat Kelas A : M3

No.

URAIAN

Analisa EI-511 URAIAN ANALISA HARGA SATUAN Lanjutan KODE

KOEF.

SATUAN

Koefisien tenaga / M3 : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

6.

7.

561,605.73 / M3.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............

bulan

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M3

(L01) (L03)

0.0595 0.0085

jam jam

KETERANGAN

Analisa EI-511 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 5.1.(1) : Lapis Pondasi Agregat Kelas A : M3

NO

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

PERKIRAAN VOL. PEK. TOTAL HARGA % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

jam jam

0.0595 0.0085

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp. )

12,600.00 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1.

Aggrgat A

M26

M3

1.2586

247,159.04

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7.

PERALATAN Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker Alat Bantu

(E15) (E09) (E13) (E17) (E23)

jam jam jam jam jam Ls

0.0085 0.3677 0.0043 0.0134 0.0141 1.0000

309,926.83 506,919.91 440,813.67 287,721.97 257,973.69 200.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

: : :

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

749.28 147.05

896.33

311,076.66

311,076.66

2,632.90 186,389.32 1,877.63 3,851.70 3,626.14 200.00

198,577.68 510,550.66 51,055.07 561,605.73

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

URAIAN

I. 1 2 3 4 5 6 7 8

9

II. 1 2 3 4

III. 1.

2. 2.a.

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal lapis agregat padat Berat isi padat Jam kerja efektif per-hari Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm - Fraksi lolos Scalping Screen 0 - 5 mm Berat volume agregat (lepas) Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Faktor kehilangan - Fraksi lolos Scalping Screen 0 - 5 mm URUTAN KERJA Wheel Loader mencampur dan memuat Agregat ke dalam Dump Truck di Base Camp Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan Motor Grader Hamparan Agregat dibasahi dengan Water Tank Truck sebelum dipadatkan dengan Tandem Roller Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparan dan level permukaan dengan menggunakan Alat Bantu PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agregat S = 1 M3 x (Bip/Bil) x Fh ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Memuat dan lain-lain Kap. Prod. / jam = Koefisien Alat / M3

2.b.

: 4.2.(2b) : Lapis Pondasi Agregat Kelas S : M3

V x Fb x Fa x 60 Ts1 x Bip/Bil = 1 : Q1

DUMP TRUCK Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu Siklus : - Waktu memuat = V x 60/Q1 x Bil - Waktu tempuh isi = (L : v1) x 60 menit - Waktu tempuh kosong = (L : v2) x 60 menit - dan lain-lain Kap. Prod. / jam = Koefisien Alat / M3

V x Fa x 60 Ts2 x Bip = 1 : Q2

Analisa EI-422b URAIAN ANALISA HARGA SATUAN

KODE

KOEF.

SATUAN

L t Bip Tk 20-30 5-10&10-20 St Bil Fh1 Fh2 Fh3

70.00 0.20 1.81 7.00 18.00 18.00 64.00 1.75 1.04 1.04 1.04

jam % % % ton/m3

(M27)

1.0757

M3

1.50 0.85 0.83

M3 -

KETERANGAN

KM M

(E15) V Fb Fa Ts1 T1 Ts1 Q1

0.45 0.45 136.42

menit menit M3

(E15)

0.0073

jam

(E09) V Fa v1 v2

10.00 0.83 30.00 45.00

ton KM/jam KM/jam

T1 T2 T3 T4 Ts2 Q2

2.51 140.00 93.33 3.00 238.85 1.15

menit menit menit menit menit M3

-

0.8681

jam

Gradasi harus memenuhi Spesifikasi

lepas kondisi sedang panduan

Berlanjut ke hal. berikut ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 4.2.(2b) : Lapis Pondasi Agregat Kelas S : M3

No.

2.c.

URAIAN

Lh x (N(b-bo)+bo) x t x Fa x 60 n x Ts3 = 1 : Q3

Koefisien Alat / M3 2.d.

TANDEM ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Jumlah lajur lintasan Lebar overlap Faktor Efisiensi alat Kap. Prod. / jam = Koefisien Alat / M3

2.e.

Koefisien Alat / M3 2.g.

3.

(v x 1000) x (N(b-bo)+bo) x t x Fa n = 1 : Q4

WATER TANK TRUCK Volume tanki air Kebutuhan air / M3 agregat padat Kapasitas pompa air Faktor Efisiensi alat Kap. Prod. / jam =

ALAT BANTU Diperlukan : - Kereta dorong - Sekop - Garpu

URAIAN ANALISA HARGA SATUAN Lanjutan KODE

MOTOR GRADER Panjang hamparan Lebar efektif kerja blade Faktor Efisiensi alat Kecepatan rata-rata alat Jumlah lintasan Lajur lintasan Lebar Overlap Waktu Siklus : - Perataan 1 lintasan = Lh : (v x 1000) x 60 - Lain-lain Kap. Prod. / jam =

Analisa EI-422b

pa x Fa x 60 Wc x 1000 = 1 : Q6

KOEF.

SATUAN

(E13) Lh b Fa v n N bo Ts3 T1 T2 Ts3 Q3

50.00 2.40 0.83 4.00 6.00 3.00 0.30

M M KM/jam lintasan

0.75 1.00 1.75 313.03

menit menit menit M3

(E13)

0.0032

jam

(E17) v b n N bo Fa Q4

1.00 1.20 6.00 3.00 0.30 0.83 83.00

KM/jam M lintasan

(E17)

0.0120

jam

(E23) V Wc pa Fa Q6

4.00 0.07 100.00 0.83 71.14

M3 M3 liter/menit M3

(E23)

0.0141

jam

KETERANGAN

1 x pp

M

m M3

Lump Sum = 2 buah. = 3 buah. = 2 buah.

TENAGA Produksi menentukan : WHEEL LOADER Produksi agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor

Q1 Qt

136.42 954.96

P M

7.00 1.00

-

0.0513 0.0073

M3/jam M3 orang orang

Koefisien tenaga / M3 : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

jam jam

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran. Berlanjut ke hal. berikut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 4.2.(2b) : Lapis Pondasi Agregat Kelas S : M3

No.

5.

URAIAN

6.

7.

364,251.36 / M3.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............ VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan :

URAIAN ANALISA HARGA SATUAN Lanjutan KODE

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

Analisa EI-422b

bulan

KOEF.

SATUAN

KETERANGAN

Analisa EI-422b FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 4.2.(2b) : Lapis Pondasi Agregat Kelas S : M3

NO

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

PERKIRAAN VOL. PEK. TOTAL HARGA % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

jam jam

0.0513 0.0073

HARGA SATUAN (Rp.)

BAHAN

1.

Aggregat S

M27

M3

1.0757

12,600.00 17,309.52

174,288.65

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6.

PERALATAN Wheel Loader Dump Truck Motor Grader Tandem Roller Water Tanker Alat Bantu

(E15) (E09) (E13) (E17) (E23)

jam jam jam jam jam Ls

0.0073 0.2604 0.0032 0.0120 0.0141 1.0000

309,926.83 506,919.91 440,813.67 287,721.97 257,973.69 100.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

853.77 310,986,884.75 2.80

JUMLAH HARGA (Rp. )

JUMLAH HARGA TENAGA B.

: : :

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

646.52 126.88

773.40

187,474.83

187,474.83

2,271.81 132,016.67 1,408.22 3,466.53 3,626.14 100.00

142,889.37 331,137.60 33,113.76 364,251.36

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

URAIAN

I. 1 2 3 4 5 6

7

8

II. 1 2 3

III. 1.

URAIAN ANALISA HARGA SATUAN

KOEF.

SATUAN

L Tk Fh

70.00 7.00 1.03

As K

80 20

D1 D2

1.03 0.80

Kg / liter Kg / liter

PC

1.03

liter

(M10) (M11)

0.8487 0.2060

Kg liter

(E41) b v pas Fa

6.00 30.00 100 0.80

M M/menit liter/menit

= 1 : Q1

Q1 (E41)

4,800.00 0.0002

liter Jam

AIR COMPRESSOR Kap. Prod. / jam = Asphalt Distributor Koefisien Alat / Ltr = 1 : Q2

(E05) Q1 (E05)

4,800.00 0.0002

liter Jam

Q4 Qt

4,800.00 33,600.00

liter liter

P M

10.00 2.00

orang orang

(L01) (L03)

0.0021 0.0004

Jam Jam

KETERANGAN

KM Jam % %

terhadap volume terhadap volume

URUTAN KERJA Aspal dan Minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal cair Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dengan Air Compressor Campuran aspal cair disemprotkan dengan Asphalt Distributor ke atas permukaan yang akan dilapis. PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Untuk mendapatkan 1 liter Lapis Resap Pengikat diperlukan : ( 1 liter x Fh ) Aspal Kerosene

2. 2.a.

ALAT ASPHALT DISTRIBUTOR Lebar penyemprotan Kecepatan penyemprotan Kapasitas pompa aspal Faktor effesiensi kerja Kap. Prod. / jam = Koefisien Alat / Ltr

3.

Analisa EI-612a

KODE

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Jarak rata-rata Base Camp ke lokasi pekerjaan Jam kerja efektif per-hari Faktor kehilangan bahan Komposisi campuran (Spesifikasi) : - Aspal Pen 60 atau Pen 80 - Kerosene Berat isi bahan : - Aspal Pen 60 atau Pen 80 - Kerosene Bahan dasar (aspal & minyak pencair) semuanya diterima di lokasi pekerjaan

1.a. 1.b.

2.b.

: 6.1 (2)(a) : Lapis Perekat - Aspal Cair : Liter

= As x PC x D1 = K x PC

pas x Fa x 60

TENAGA Produksi menentukan : ASPHALT SPRAYER Produksi Lapis Resap Pengikat / hari = Tk x Q4 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / liter : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

asumsi Panduan sedang

Berlanjut ke hal. berikut. ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 6.1 (2)(a) : Lapis Perekat - Aspal Cair : Liter

No.

URAIAN

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan :

6.

7.

12,696.37 / liter.

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............

URAIAN ANALISA HARGA SATUAN Lanjutan KODE

4.

Rp.

Analisa EI-612a

bulan

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 5,715.00 Liter

KOEF.

SATUAN

KETERANGAN

Analisa EI-612a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 6.1 (2)(a) : Lapis Perekat - Aspal Cair : Liter

NO.

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

PERKIRAAN KUANTITAS

Jam Jam

0.0021 0.0004

HARGA SATUAN (Rp.)

12,600.00 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Aspal Kerosene

(M10) (M11)

Kg liter

0.8487 0.2060

11,000.00 10,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Asp. Distributor Compressor

E41 E05

Jam Jam

0.0002 0.0002

364,866.85 176,454.51

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

2

3 4

: : :

5,715.00 72,559,773.66 0.65

JUMLAH HARGA (Rp.)

26.25 7.21

33.46

9,335.92 2,060.00

11,395.92

76.01 36.76

112.78 11,542.16 1,154.22 12,696.37

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

URAIAN

I. 1 2 3 4 5 6 7 8 9 10

11

12 II. 1 2

3 4

III. 1. 1.a. 1.b. 1.c. 1.d. 2. 2.a.

: 6.3(5a) : Laston Lapis Aus (AC-WC) : Ton

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal Lapis (AC-WC L) padat Jam kerja efektif per-hari Faktor kehilanganmaterial :

Analisa EI-635a URAIAN ANALISA HARGA SATUAN

KODE

- Agregat - Aspal

Berat isi Agregat (padat) Berat Isi Agregat (lepas) Komposisi campuran AC-WC : - Agr Pch Mesin 5 - 10 & 10 - 15 mm - Agregat Pecah Mesin 0 - 5 mm - Semen - Asphalt - Anti Stripping Agent Berat isi bahan : - AC-WC - Agr Pch Mesin 5 - 10 & 10 - 15 mm - Agr Pch Mesin 0 - 5 mm Jarak Stock pile ke Cold Bin URUTAN KERJA Wheel Loader memuat Agregat ke dalam Cold Bin AMP. Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan. Campuran panas AC dihampar dengan Finisher dan dipadatkan dengan Tandem & Pneumatic Tire Roller. Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan dengan menggunakan Alat Bantu.

KOEF.

SATUAN

L t Tk Fh1 Fh2 Bip Bil

70.00 0.04 7.00 1.05 1.03 1.81 1.51

KM M Jam ton/m3 ton/m3

5-10&10-15 0-5 FF As Asa

40.28 52.68 0.94 6.10 0.30

% % % % %As

D1 D2 D3 l

2.32 1.42 1.57 0.05

ton / M3 ton / M3 ton / M3 km

KETERANGAN

Gradasi harus memenuhi Spesifikasi

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 Agr 0-5 = ("0-5" x Fh1) : D3 Semen = (FF x Fh1) x 1000 Aspal = (As x Fh2) x 1000 ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor efisiensi alat Waktu Siklus T1 + T2 + T3 - Kecepatan maju rata rata - Kecepatan kembali rata rata - Muat ke Bin = (l x 60) / Vf - Kembali ke Stock pile = (l x 60) / Vr - Lain - lain (waktu pasti) Kap. Prod. / jam = Koefisien Alat/ton

V x Fb x Fa x 60 x Bip Ts1 = 1 : Q1

(M92) (M91) (M05) (M10)

0.2978 0.3523 9.8700 62.8300

M3 M3 Kg Kg

(E15) V Fb Fa Ts1 Vf Vr T1 T2 T3 Ts1 Q1

1.50 0.85 0.83

M3 -

panduan

15.00 20.00 0.20 0.15 1.00 1.35 85.13

km/jam km/jam menit menit menit menit ton

panduan panduan

(E15)

0.0117

Jam

Berlanjut ke hal. berikut. ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 6.3(5a) : Laston Lapis Aus (AC-WC) : Ton

No.

2.b.

URAIAN

ASPHALT MIXING PLANT (AMP) Kapasitas produksi Faktor Efisiensi alat

SATUAN

Q2

49.80

ton

(E01)

0.0201

Jam

GENERATORSET ( GENSET ) Kap.Prod. / Jam = SAMA DENGAN AMP Koefisien Alat/ton = 1 : Q3

(E12) Q3 (E12)

49.80 0.0201

ton Jam

DUMP TRUCK (DT) Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Kapasitas AMP / batch Waktu menyiapkan 1 batch AC-BC Waktu Siklus - Mengisi Bak = (V : Q2b) x Tb - Angkut = (L : v1) x 60 menit - Tunggu + dump + Putar - Kembali = (L : v2) x 60 menit

(E09) V Fa v1 v2 Q2b Tb Ts2 T1 T2 T3 T4 Ts2

10.00 0.80 35.00 45.00 1.00 1.00

Ton KM / Jam KM / Jam ton menit

10.00 120.00 20.00 93.33 243.33

menit menit menit menit menit

Koefisien Alat/ton ASPHALT FINISHER Kecepatan menghampar Faktor efisiensi alat Lebar hamparan Kap.Prod. / jam = Koefisien Alat/ton 2.f.

KOEF.

ton / Jam -

V x Fa = 1 : Q2

Kap.Prod. / jam =

2.e.

KODE

60.00 0.83

Koefisien Alat/ton

2.d.

URAIAN ANALISA HARGA SATUAN Lanjutan

(E01) V Fa

Kap.Prod. / jam =

2.c.

Analisa EI-635a

TANDEM ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Lajur lintasan Faktor Efisiensi alat Lebar Overlap Apabila N <= 1 Kap. Prod. / jam = Apabila N > 1 Kap. Prod. / jam =

V x Fa x 60 Ts2 = 1 : Q4

V x b x 60 x Fa x t x D1 = 1 : Q5

(v x 1000) x b x t x Fa x D1 n (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 n

Q4

1.97

ton

(E09)

0.5069

Jam

(E02) V Fa b Q5

5.00 0.83 3.15 72.79

m/menit meter ton

(E02)

0.0137

Jam

(E17) v b n N Fa bo

1.50 1.48 6.00 3.00 0.83 0.30

Q6

0.0000

73.94

Km / Jam M lintasan M ton

KETERANGAN

2 Awal & 4 Akhir

Koefisien Alat/ton

= 1 : Q6

(E17)

0.0135

Jam Berlanjut ke hal. berikut.

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 6.3(5a) : Laston Lapis Aus (AC-WC) : Ton

No.

2.g.

URAIAN

2.h.

3.

(E18) v b n N bo Fa (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 n = 1 : Q7

Koefisien Alat/ton

Koefisien Tenaga / ton

2.50 1.99 6.00 3.00 0.30 0.83

SATUAN

KM / jam M lintasan M -

Q7

172.34

ton

(E18)

0.0058

Jam

Q2 Qt

49.80 348.60

M2 / Jam M2

P M

10.00 1.00

orang orang

(L01) (L03)

0.2008 0.0201

Jam Jam

: = (Tk x P) / Qt = (Tk x M) / Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

KETERANGAN

Lump Sum

- Pekerja - Mandor

7.

KOEF.

ALAT BANTU - Rambu = 2 buah - Kereta dorong = 2 buah - Sekop = 3 buah - Garpu = 2 buah - Tongkat Kontrol ketebalan hanparan TENAGA Produksi menentukan : A M P Produksi AC-WC / hari = Tk x Q2 Kebutuhan tenaga : - Pekerja - Mandor

6.

URAIAN ANALISA HARGA SATUAN Lanjutan KODE

PNEUMATIC TIRE ROLLER Kecepatan rata-rata Lebar efektif pemadatan Jumlah lintasan Lajur lintasan Lebar Overlap Faktor Efisiensi alat Kap.Prod./jam =

Analisa EI-635a

1,282,164.67 / ton

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............

bulan

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1,471.30 ton

Analisa EI-635a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 6.3(5a) : Laston Lapis Aus (AC-WC) : Ton

NO

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.2008 0.0201

12,600.00 17,309.52

Jam Jam

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4.

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 0 - 5) Semen Aspal

C. 1. 2. 3. 4. 5. 6. 7. 8.

PERALATAN Wheel Loader AMP Genset Dump Truck Asp. Finisher Tandem Roller P. Tyre Roller Alat Bantu

(M05) (M10)

E15 E01 E12 E09 E02 E17 E18

M3 M3 Kg Kg

0.2978 0.3523 9.8700 62.8300

Jam Jam Jam Jam Jam Jam Jam Ls

121,145.22 152,863.04 900.00 11,000.00

JUMLAH HARGA (Rp. )

2,530.12 347.58

2,877.70

36,082.51 53,856.47 8,883.00 691,130.00

789,951.98

0.0117 0.0201 0.0161 0.4056 0.0137 0.0135 0.0058 1.0000

3,640.62 138,814.45 7,108.08 205,584.19 6,269.97 3,891.13 2,466.13 5,000.00

309,926.83 6,912,959.81 442,478.14 506,919.91 456,376.53 287,721.97 425,015.96 5,000.00

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

3 4

1,471.30 1,886,448,880.10 16.98

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

2

: : :

372,774.57 1,165,604.25 116,560.42 1,282,164.67

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 6.3(6a) : Laston Lapis Antara (AC-BC) : Ton

URAIAN

I. 1 2 3 4 5 6 7 8 9 10

11

12 II. 1 2

3

4

III. 1. 1.a. 1.b. 1.c. 1.d. 2. 2.a.

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : rusak Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal Lapis (AC) padat Jam kerja efektif per-hari Faktor kehilanganmaterial :

Analisa EI-636a URAIAN ANALISA HARGA SATUAN

KODE

- Agregat - Aspal

Berat isi Agregat (padat) Berat Isi Agregat (lepas) Komposisi campuran AC-BC : - Agr Pch Mesin 5 - 10 & 10 - 20 mm - Agregat Pecah Mesin 0 - 5 mm - Semen - Asphalt - Anti Stripping Agent Berat Isi bahan : - AC-BC - Agr Pch Mesin 5 - 10 & 10 - 20 mm - Agr Pch Mesin 0 - 5 mm Jarak Stock file ke cold bin

KOEF.

SATUAN

L t Tk Fh1 Fh2 Bip Bil

70.00 0.05 7.00 1.07 1.05 1.81 1.51

KM M Jam ton/m3 ton/m3

5-10&10-20 0-5 FF As Asa

46.75 46.75 0.90 5.60 0.30

% % % % %As

D1 D2 D3 l

2.32 1.41 1.57 0.05

ton / M3 ton / M3 ton / M3 km

KETERANGAN

Gradasi harus memenuhi Spesifikasi

URUTAN KERJA / METODE PELAKSANAAN Wheel Loader memuat Agregat dan Asphalt ke dalam Cold Bin AMP Agregat dan aspal dicampur dan dipanaskan dengan dengan AMP untuk dimuat langsung ke dalam Dump Truck dan diangkut ke lokasi pekerjaan Campuran panas AC dihampar dengan Finisher dan dipadatkan dengan Tandem & Pneumatic Tire Roller Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan dengan menggunakan Alat Bantu PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 Agr 0-5 = ("0-5" x Fh1) : D3 Semen = (FF x Fh1) x 1000 Aspal = (As x Fh2) x 1000 ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor efisiensi alat Waktu Siklus T1 + T2 + T3 - Kecepatan maju rata rata - Kecepatan kembali rata rata - Muat ke Bin = (l x 60) / Vf - Kembali ke Stock pile = (l x 60) / Vr - Lain - lain (waktu pasti) Kap. Prod. / jam = Koefisien Alat/ton

V x Fb x Fa x 60 x Bip Ts1 = 1 : Q1

(M92) (M91) (M05) (M10)

0.3548 0.3186 9.6300 58.8000

M3 M3 Kg Kg

(E15) V Fb Fa Ts1 Vf Vr T1 T2 T3 Ts1 Q1

1.50 0.85 0.83 1.10 15.00 20.00 0.20 0.15 0.75 1.10 104.48

M3 menit km/jam km/jam menit menit menit menit ton

(E15)

0.0096

Jam

panduan panduan

Berlanjut ke hal. berikut. ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

2.b.

2.c.

2.d.

URAIAN

2.f.

2.g.

Analisa EI-636a URAIAN ANALISA HARGA SATUAN Lanjutan KODE

KOEF.

SATUAN

ASPHALT MIXING PLANT (AMP) Kapasitas produksi Faktor Efisiensi alat Kap.Prod. / jam = V x Fa Koefisien Alat / ton = 1 : Q2

(E01) V Fa Q2 (E01)

60.00 0.83 49.80 0.0201

ton / Jam ton Jam

GENERATORSET ( GENSET ) Kap.Prod. / Jam = SAMA DENGAN AMP Koefisien Alat / ton = 1 : Q3

(E12) Q3 (E12)

49.80 0.0201

ton Jam

DUMP TRUCK (DT) Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Kapasitas AMP / batch Waktu menyiapkan 1 batch AC-BC Waktu Siklus - Mengisi Bak = (V : Q2b) x Tb - Angkut = (L : v1) x 60 menit - Tunggu + dump + Putar - Kembali = (L : v2) x 60 menit

(E09) V Fa v1 v2 Q2b Tb Ts2 T1 T2 T3 T4 Ts2 Q4

10.00 0.80 35.00 45.00 1.00 1.00

ton Km / Jam Km / Jam ton menit

10.00 120.00 20.00 93.33 243.33 1.97

menit menit menit menit menit ton

0.5069

Jam

5.00 0.83 3.15 90.98 0.0110

m/menit meter ton Jam

1.50 1.48 6.00 3.00 0.30 0.83 92.43

Km / Jam M lintasan

0.0108

Jam

2.50 1.99 6.00 3.00 0.30 0.83 215.43

KM / Jam M lintasan

Kap.Prod. / jam =

2.e.

: 6.3(6a) : Laston Lapis Antara (AC-BC) : Ton

Koefisien Alat / ton ASPHALT FINISHER Kecepatan menghampar Faktor efisiensi alat Lebar hamparan Kap.Prod. / jam = Koefisien Alat / ton TANDEM ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Jumlah lajur lintasan Lebar overlap Faktor Efisiensi alat Kap. Prod./jam =

V x Fa x 60 Ts2 = 1 : Q4

V x b x 60 x Fa x t x D1 = 1 : Q5

(v x 1000) x (N(b-bo)+bo) x t x Fa x D1 n = 1 : Q6

Koefisien Alat / ton PNEUMATIC TIRE ROLLER Kecepatan rata-rata Lebar efektif pemadatan Jumlah lintasan Lajur lintasan Lebar Overlap Faktor Efisiensi alat Kap.Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 n

(E09) (E02) V Fa b Q5 (E02) (E17) v b n N bo Fa Q6 (E17) (E18) v b n N bo Fa Q7

m ton

M ton

KETERANGAN

Normal

2 awal & 4 Akhir

Normal

Koefisien Alat / ton

= 1 : Q7

(E18)

0.0046

Jam Berlanjut ke hal. berikut.

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 6.3(6a) : Laston Lapis Antara (AC-BC) : Ton

No.

2.h.

3.

URAIAN

KOEF.

SATUAN

ALAT BANTU diperlukan : - Kereta dorong = 2 buah - Sekop = 3 buah - Garpu = 2 buah - Tongkat Kontrol ketebalan hanparan

Koefisien Tenaga / ton

Q2 Qt

49.80 348.60

ton ton

P M

12.00 1.00

orang orang

(L01) (L03)

0.2410 0.0201

Jam Jam

: = (Tk x P) / Qt = (Tk x M) / Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

KETERANGAN

Lump Sum

- Pekerja - Mandor

7.

URAIAN ANALISA HARGA SATUAN Lanjutan KODE

TENAGA Produksi menentukan : AMP Produksi AC-BC / hari = Tk x Q5 Kebutuhan tenaga : - Pekerja - Mandor

6.

Analisa EI-636c

1,230,164.84 / TON

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............

bulan

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 1,495.53 ton

Analisa EI-636a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 6.3(6a) : Laston Lapis Antara (AC-BC) : Ton

NO

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0.2410 0.0201

12,600.00 17,309.52

Jam Jam

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4.

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 0 - 5) Semen Aspal

(M05) (M10)

M3 M3 Kg Kg

0.3548 0.3186 9.6300 58.8000

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E09 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0120 0.4056 0.0110 0.0108 0.0046 1.0000

121,145.22 152,863.04 900.00 11,000.00

309,926.83 6,912,959.81 442,478.14 506,919.91 456,376.53 287,721.97 425,015.96 5,000.00

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

3 4

JUMLAH HARGA (Rp. )

3,036.14 347.58

42,978.63 48,704.40 8,667.00 646,800.00

747,150.03

JUMLAH HARGA PERALATAN

2

1,495.53 1,839,748,418.06 16.564

3,383.73

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6. 7. 8.

: : :

2,966.43 138,814.45 5,331.06 205,584.19 5,015.98 3,112.90 1,972.90 5,000.00 367,797.91 1,118,331.67 111,833.17 1,230,164.84

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 7.1 (7) a : Beton mutu sedang fc’= 20 MPa : M3

URAIAN

I. 1 2 3 4 5 6 7 8 9

10

II. 1 2 3

ASUMSI Menggunakan alat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Bahan dasar (batu, pasir dan semen) diterima seluruhnya di lokasi pekerjaan Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Kadar Semen Minimum Ukuran Agregat Maksimum Perbandingan Air/Semen Maksimum Perbandingan Camp.

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Semen (PC) = Sm x 1.03 Pasir Beton = (Ps/1000 : D3) x 1.05 Agregat Kasar = (Kr/1000 : D4) x 1.05 Kayu Perancah dan/atau Bekisting Paku

2. 2.a.

ALAT CONCRETE PAN MIXER (BATCHING PLANT) Kapasitas Alat Faktor Efisiensi Alat Waktu siklus : (T1 + T2 + T3 + T4) - Memuat - Mengaduk - Menuang - Tunggu, dll. Kap. Prod. / jam = Koefisien Alat / M3

2.b.

V x Fa x 60 1000 x Ts = 1 : Q1

TRUK MIXER Kapasitas drum Faktor efisiensi alat Kecepatan rata rata bermuatan Kecepatan rata rata kosong Waktu siklus : (T1 + T2 + T3 + T4) - memuat V : Q1 x 60 - tempuh isi L x 60 : v1 - tempuh kosong L x 60 : v2 - menumpahkan

URAIAN ANALISA HARGA SATUAN

KODE

: Semen : Pasir : Agregat Kasar

Berat Isi : - Beton - Semen - Pasir - Agregat Kasar URUTAN KERJA Semen, pasir, batu kerikil dan air dicampur dan diaduk menjadi beton dengan menggunakan Concrete Mixer Beton di-cor ke dalam bekisting yang telah disiapkan Penyelesaian dan perapihan setelah pemasangan

III. 1. 1.a. 1.b. 1.c. 1.d. 1.e.

Analisa EI-717a

KOEF.

SATUAN

L Tk Ks Ag Wcr Sm Ps Kr

40.00 7.00 340 19 0.50 410.0 670.0 992.0

KM jam Kg/M3 mm Kg/M3 Kg/M3 Kg/M3

D1 D2 D3 D4

2.40 1.25 1.30 1.40

T/M3 T/M3 T/M3 T/M3

(M12) (M01a) (M03) (M19) (M18)

(E43) V Fa Ts T1 T2 T3 T4 Ts Q1 (E43) (E49) V Fa v1 v2 Ts2 T1 T2 T3 T4

422.300 0.5412 0.7440 0.1000 0.8000

Kg M3 M3 M3 Kg

600.00 0.83

liter -

1.00 1.00 0.50 0.50 3.00 9.960

menit menit menit menit menit M3

0.1004

jam

5.00 0.83 35.00 50.00

M3 km/jam km/jam

30.12 68.57 48.00 10.00

menit menit menit menit

KETERANGAN

Berdasarkan JMF dari EE

Ts

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.1 (7) a : Beton mutu sedang fc’= 20 MPa : M3

No.

Q2

WATER TANK TRUCK Volume Tanki Air Kebutuhan air / M3 beton Faktor Efiesiensi Alat Kapasitas pompa air pa x Fa x 60 1000 x Wc

Koefisien Alat / M3

3.

KODE

= 1 : Q2

Kap. Prod. / jam =

2.c.

URAIAN ANALISA HARGA SATUAN Lanjutan

V x Fa x 60 Ts2

Koefisien Alat / M3

= 1 : Q3

TENAGA Produksi Beton dalam 1 hari

= Tk x Q1

- Mandor - Tukang

SATUAN

1.59

M3

(E49)

0.6293

jam

(E23) V Wc Fa Pa

4.00 0.19 0.83 100.00

M3 M3 liter/menit

Q3

26.21

M3

(E23)

0.0382

jam

Qt

69.72

M3

M Tb

1.00 8.00

orang orang

4 4

- Tk Batu = - Tk Kayu = - Pekerja

KETERANGAN

= (Tk x M) : Qt = (Tk x Tb) : Qt = (Tk x P) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

1 Tk = 20 m3 btn 1 Tk = 2 m3 kayu P

Koefisien Tenaga / M3 : - Mandor - Tukang - Pekerja

7.

KOEF.

ALAT BANTU Alat bantu

Kebutuhan tenaga :

6.

menit

Analisa EI-717a

URAIAN

Kap. Prod. / jam =

2.c.

156.69

1,495,768.69 / M3

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............

bulan

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M3

(L03) (L02) (L01)

8.00

0.1004 0.8032 0.8032

orang

jam jam jam

Analisa EI-717a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 7.1 (7) a PERKIRAAN VOL. PEK. : Beton mutu sedang fc’= 20 MPa TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

NO

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

PERKIRAAN KUANTITAS

jam jam jam

0.8032 0.8032 0.1004

HARGA SATUAN (Rp.)

: : :

JUMLAH HARGA (Rp. )

12,600.00 14,452.38 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4. 5.

Semen Pasir beton Agregat Kasar Kayu Perancah Paku

(M12) (M01a) (M03) (M19) (M18)

Kg M3 M3 M3 Kg

422.3000 0.5412 0.7440 0.1000 0.8000

1,240.00 110,000.00 126,431.52 2,000,000.00 17,300.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4.

Con Pan. Mixer Truck Mixer Water Tanker Alat Bantu

E43 E49 E23

jam jam jam Ls

0.1004 0.6293 0.0382 1.0000

645,798.67 587,265.80 257,973.69 1,000.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

2

3 4

0.00 0.00 0.00

10,120.48 11,608.34 1,737.90 23,466.72

523,652.00 59,526.92 94,065.05 200,000.00 13,840.00 891,083.97

64,839.22 369,557.43 9,842.37 1,000.00

445,239.02 1,359,789.72 135,978.97 1,495,768.69

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.1 (8) : Beton mutu rendah fc’= 15 MPa : M3

No.

URAIAN

I. 1 2 3 4 5 6 7 8

9

II. 1 2 3 III. 1. 1.a. 1.b. 1.c. 1.d. 1.e. 2. 2.a.

ASUMSI Menggunakan alat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Bahan dasar (batu, pasir dan semen) diterima seluruhnya di lokasi pekerjaan Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Kadar Semen Minimum Perbandingan Air/Semen Maksimum Perbandingan Camp.

URAIAN ANALISA HARGA SATUAN

KODE

: Semen : Pasir : Agregat Kasar

Berat Isi : - Beton - Semen - Pasir - Agregat Kasar

KOEF.

SATUAN

L Tk Ks Wcr Sm Ps Kr

70.00 7.00 300 0.57 318.0 622.0 1,207.0

KM jam Kg/M3 Kg/M3 Kg/M3 Kg/M3

D1 D2 D3 D4

2.40 1.25 1.30 1.40

T/M3 T/M3 T/M3 T/M3

KETERANGAN

Berdasarkan JMF dari EE

URUTAN KERJA Semen, pasir, batu kerikil dan air dicampur dan diaduk menjadi beton dengan menggunakan Concrete Mixer Beton di-cor ke dalam bekisting yang telah disiapkan Penyelesaian dan perapihan setelah pemasangan PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Semen (PC) = Sm x 1.03 Pasir Beton = (Ps/1000 : D3) x 1.05 Agregat Kasar = (Kr/1000 : D4) x 1.05 Kayu Perancah dan/atau Bekisting Paku ALAT CONCRETE MIXER Kapasitas Alat Faktor Efisiensi Alat Waktu siklus : - Memuat - Mengaduk - Menuang - Tunggu, dll.

(T1 + T2 + T3 + T4)

Kap. Prod. / jam = Koefisien Alat / M3 2.b.

Analisa EI-718

V x Fa x 60 1000 x Ts = 1 : Q1

WATER TANK TRUCK Volume Tanki Air Kebutuhan air / M3 beton Faktor Efiesiensi Alat Kapasitas pompa air Kap. Prod. / jam =

Koefisien Alat / M3

pa x Fa x 60 1000 x Wc = 1 : Q2

(M12) (M01a) (M03) (M19) (M18)

327.540 0.5024 0.9053 0.1000 0.8000

Kg M3 M3 M3 Kg

500.00 0.83

liter -

10.00 5.00 2.00 5.00 22.00 1.132

menit menit menit menit menit M3/jam

(E06)

0.8835

jam

(E23) V Wc Fa Pa Q2

4.00 0.19 0.83 100.00 26.21

M3 M3 liter/menit M3

(E23)

0.0382

jam

(E06) V Fa Ts T1 T2 T3 T4 Ts Q1

653.10 1,267.35

Berlanjut ke hal. berikut. ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.1 (8) : Beton mutu rendah fc’= 15 MPa : M3

No.

2.c.

3.

Analisa EI-718 URAIAN ANALISA HARGA SATUAN Lanjutan

URAIAN

KODE

TENAGA Produksi Beton dalam 1 hari

= Tk x Q1

- Mandor - Tukang

- Pekerja

7.92

M3

M Tb

1.00 2.00

orang orang

KETERANGAN

1 Tk = 20 m3 btn 1 Tk = 2 m3 kayu P

Koefisien Tenaga / M3 : - Mandor - Tukang - Pekerja

= (Tk x M) : Qt = (Tk x Tb) : Qt = (Tk x P) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

Qt

1 1

- Tk Batu = - Tk Kayu =

7.

SATUAN

ALAT BANTU Alat bantu

Kebutuhan tenaga :

6.

KOEF.

1,031,827.5 / M3

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............

bulan

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M3

(L03) (L02) (L01)

2.00

0.8835 1.7671 1.7671

orang

jam jam jam

Analisa EI-718 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

Satker / PPK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 7.1 (8) : Beton mutu rendah fc’= 15 MPa : M3

NO

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

PERKIRAAN VOL. PE: TOTAL HARGA (Rp.) : % THD. BIAYA PROY :

PERKIRAAN KUANTITAS

jam jam jam

1.7671 1.7671 0.8835

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp. )

12,600.00 14,452.38 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3. 4. 5.

Semen Pasir beton Agregat Kasar Kayu Perancah Paku

(M12) (M01a) (M03) (M19) (M18)

Kg M3 M3 M3 Kg

327.5400 0.5024 0.9053 0.1000 0.8000

1,240.00 110,000.00 126,431.52 2,000,000.00 17,300.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Conc. Mixer Water Tanker Alat Bantu

E06 E23

jam jam Ls

0.8835 0.0382 1.0000

84,752.41 257,973.69 500.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

2

3 4

22,265.06 25,538.34 15,293.56 63,096.96

406,149.60 55,262.31 114,452.13 200,000.00 13,840.00 789,704.04

74,881.65 9,842.37 500.00

85,224.02 938,025.02 93,802.50 1,031,827.52

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.3 (1) : Baja Tulangan U 24 Polos : Kg

No.

1 2 3 4 5 6 II. 1 2

1. 1.a. 1.b. 2. 2.a.

3.

URAIAN ANALISA HARGA SATUAN

URAIAN

I.

III.

Analisa EI-731

KODE

ASUMSI Pekerjaan dilakukan secara manual Lokasi pekerjaan : sepanjang jalan Bahan dasar (besi dan kawat) diterima seluruhnya di lokasi pekerjaan Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Faktor Kehilangan Besi Tulangan

L Tk Fh

70.00 7.00 1.10

KM jam -

(M39a) (M14)

1.1000 0.0025

Kg Kg

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Baja Tulangan (Polos) U24 Kawat beton ALAT ALAT BANTU Diperlukan : - Gunting Potong Baja - Kunci Pembengkok Tulangan - Alat lainnya

Ls = 2 buah = 2 buah

TENAGA Produksi kerja satu hari dibutuhkan tenaga : - Mandor - Tukang - Pekerja

= ( M x Tk ) : Qt = ( Tb x Tk ) : Qt = ( P x Tk ) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

7.

SATUAN

URUTAN KERJA Besi tulangan dipotong dan dibengkokkan sesuai dengan yang diperlukan Batang tulangan dipasang / disusun sesuai dengan Gambar Pelaksanaan dan persilangannya diikat kawat

Koefisien Tenaga / Kg : - Mandor - Tukang - Pekerja

6.

KOEF.

15,453.26 / Kg

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............

bulan

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 Kg.

Qt M Tb P

200.00 1.00 1.00 3.00

Kg orang orang orang

(L03) (L02) (L01)

0.0350 0.0350 0.1050

jam jam jam

KETERANGAN

Analisa EI-731

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 7.3 (1) : Baja Tulangan Polos BjTP 280 : Kg

NO

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

SATUAN

(L01) (L02) (L03)

PERKIRAAN KUANTITAS

jam jam jam

0.1050 0.0350 0.0350

: : :

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp. )

12,600.00 14,452.38 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Baja Tulangan Kawat Beton

(M39a) (M14)

Kg Kg

1.1000 0.0025

10,500.00 17,500.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

20.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

2

3 4

0.00 0.00 0.00

1,323.00 505.83 605.83 2,434.67

11,550.00 43.75

11,593.75

20.00

20.00 14,048.42 1,404.84 15,453.26

Analisa EI-741a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 7.4 (1) a PERKIRAAN VOL. PEK. : Penyediaan Baja Struktur Grade 250 (Kuat Leleh 2 TOTAL HARGA (Rp.) : Kg % THD. BIAYA PROYEK

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

PERKIRAAN KUANTITAS

jam jam jam

0.0010 0.0001 0.0001

HARGA SATUAN (Rp.)

: : :

JUMLAH HARGA (Rp. )

12,600.00 14,452.38 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1.

Baja Struktur Grade 250 (Kuat Leleh 250 MPa)

Kg

1.0000

15,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Tronton Crane Alat Bantu

(E35) (E07)

jam jam Ls

0.0004 0.0001 1.0000

485,356.73 367,277.11 50.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

2

3 4

59.97 1,010,425.07 0.01

12.65 1.45 1.74

15.84

15,000.00

15,000.00

214.41 36.88 50.00

301.29 15,317.13 1,531.71 16,848.84

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.4 (1) a : Penyediaan Baja Struktur Grade 250 (Kuat Leleh 250 MPa) : Kg

No.

URAIAN

I. 1 2 3 4 5 6

II. 1 2 3

III.

1.

2. 2.a

ASUMSI Membeli Komponen Baja Struktur dari Pabrik (telah di coating) Lokasi pekerjaan : di setiap jembatan Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Jarak pabrik ke Lokasi Jembatan Berat Rangka Baja per komponen

KOEF.

SATUAN

70.00 7.00 30.00 1,200.00

KM jam KM Kg

1.0000

kg

15,000.00 0.83 20.00 30.00

Kg Km/Jam Km/Jam

90.00 60.00 180.00 330.00 2,263.64

menit menit menit menit kg

(E35)

0.0004

Jam

(E07) V2 Fa

1.00 0.83

Buah -

KETERANGAN

PEMAKAIAN BAHAN, ALAT DAN TENAGA A. PENGADAAN BAHAN Baja Struktur BJ 34 (Titik Leleh 210 MPa) ALAT TRONTON Kapasitas bak sekali muat Faktor efisiensi alat Kecepatanrata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus : - Waktu tempuh isi = (Ld2 : v1 ) x 60 - Waktu tempuh kosong = (Ld2 : v2) x 60 - Lain-lain (bongkar dan muat)

Koefisien Alat / kg

V x Fa x 60 Ts1

= 1 : Q1

CRANE Kapasitas Faktor Efisiensi alat Waktu siklus - Waktu membongkar - dan lain-lain ( termasuk mengatur dan menggeser) Kap. Prod. / jam = Koefisien Alat / kg

2.c.

Lp Tk Ld2 Bg

URAIAN ANALISA HARGA SATUAN

URUTAN KERJA Baja disiapkan oleh pabrik dan dimuat ke Tronton dengan biaya atas tanggungan pabrik Mengangkut ke lokasi Jembatan dengan biaya atas tanggungan Kontraktor Menurunkan dari tronton menggunakan Crane dengan biaya atas tanggungan Kontraktor

Kapasitas Produksi / Jam =

2.b

KODE

Analisa EI-741a

V x Fa x Bg x 60 Ts2 = 1 : Q2

ALAT BANTU Diperlukan alat bantu untuk transportasi - Tackle - Tambang - Alat kecil lainnya

(E35) V Fa v1 v2 Ts1 T1 T2 T3 Ts1 Q1

T1 T2 Ts2 Q2 (E07)

1.00 5.00 6.00 9,960.00 0.0001

menit menit menit Kg/jam

Lumpsum

jam

Lumpsum

Berlanjut ke hal. berikut. ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.4 (1) a : Penyediaan Baja Struktur Grade 250 (Kuat Leleh 250 MPa) : Kg

No. 3.

URAIAN

= (Tk x M) : Qt = (Tk x Tb) : Qt = (Tk x P) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

URAIAN ANALISA HARGA SATUAN Lanjutan KODE

TENAGA Produksi per hari (unloading) = Q2 x Tk Kebutuhan tenaga (di lokasi pekerjaan) : - Mandor - Tukang - Pekerja Koefisien Tenaga / kg : - Mandor - Tukang - Pekerja

Analisa EI-741a

16,848.8 / Kg

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 59.97 M3

KOEF.

SATUAN

Qt

69,720.00

kg

M Tb P

1.00 1.00 10.00

orang orang orang

(L03) (L02) (L01)

0.0001 0.0001 0.0010

jam jam jam

KETERANGAN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.4 (2) a : Pemasangan Baja Struktur Grade 250 (Kuat Leleh 250 MPa) : Kg

No.

URAIAN

I. 1 2 3 4 5 6 II. 1 2 3

III.

KODE

ASUMSI Membeli Komponen Baja Struktur dari Pabrik (telah di coating) Lokasi pekerjaan : di setiap jembatan Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Jarak pabrik ke Lokasi Jembatan Berat Rangka Baja per komponen

Lp Tk Ld2 Bg

Analisa EI-742a URAIAN ANALISA HARGA SATUAN

KOEF.

70.00 7.00 30.00 1,200.00

SATUAN

KETERANGAN

KM jam KM Kg

URUTAN KERJA Baja disiapkan oleh pabrik dan dimuat ke Tronton dengan biaya atas tanggungan pabrik Mengangkut ke lokasi Jembatan dengan biaya atas tanggungan Kontraktor Menurunkan dari tronton menggunakan Crane dengan biaya atas tanggungan Kontraktor PEMAKAIAN BAHAN, ALAT DAN TENAGA A. PENGADAAN BAHAN Sudah ada

1.

2. 2.b.

ALAT Crane on Track 35 Ton Kapasitas Faktor Efisiensi alat Waktu siklus - Waktu penggeseran - Waktu Erection - Waktu lain-lain ( perkuatan rangka ) Kap. Prod. / jam = Koefisien Alat / Kg

2.b.

3.

4.

(E31) V2 Fa

V2 x Fa x Bg x 60 Ts2 = 1 : Q1

1.00 0.83

buah -

T1 T2 T3 Ts1 Q1

20.00 30.00 10.00 60.00 996.00

menit menit menit menit Kg/jam

(E31)

0.0010

Jam

ALAT BANTU Diperlukan alat bantu kecil - Kunci dan perlengkapannya - Takel, tambang, Sling dan lain-lainnya. TENAGA Produksi Rangka baja (Prod. Crane menentukan) Kebutuhan tenaga tambahan di lokasi : - Mandor - Tukang - Pekerja Koefisien Tenaga / Kg : - Mandor - Tukang - Pekerja

Lumpsum

= ( M x Tk ) : Qt = ( Tb x Tk ) : Qt = ( P x Tk ) : Qt

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

Qt

6,972.0

kg

M T P

1.00 4.00 16.00

orang orang orang

(L03) (L02) (L01)

0.0010 0.0040 0.0161

jam jam jam

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.4 (2) a : Pemasangan Baja Struktur Grade 250 (Kuat Leleh 250 MPa) : Kg

No.

5.

URAIAN

KODE

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

956.8 / Kg

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M3

0 URAIAN ANALISA HARGA SATUAN

KOEF.

SATUAN

KETERANGAN

Analisa EI-742a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 7.4 (2) a : Pemasangan Baja Struktur Grade 250 (Kuat Leleh 250 MPa) : Kg

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

0.0161 0.0040 0.0010

PERKIRAAN VOL. PE: TOTAL HARGA (Rp.) : % THD. BIAYA PROY :

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp. )

12,600.00 14,452.38 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1.

Sudah ada

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Tronton Crane Alat Bantu

(E35) (E31)

jam jam Ls

0.0000 0.0010 1.0000

485,356.73 584,675.46 5.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

202.41 58.04 17.38

277.83

-

0.00 587.02 5.00

592.02 869.85 86.99 956.84

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.9.(1) : Pasangan Batu : M3

No.

1 2 3 4 5 6 7

8

II. 1 2 3

1. 1.a. 1.b.

ASUMSI Menggunakan alat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Bahan dasar (batu, pasir dan semen) diterima seluruhnya di lokasi pekerjaan Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Perbandingan Pasir & Semen

KODE

: - Volume Semen : - Volume Pasir

Perbandingan Batu & Mortar : - Batu - Mortar (campuran semen & pasir) Berat Jenis Bahan : - Pasangan Batu Dengan Mortar - Batu - Adukan (mortar) - Pasir - Semen Portland

KOEF.

SATUAN

L Tk Sm Ps

70.00 7.00 25 75

Bt Mr

65 35

D1 D2 D3 D4 D5

2.40 1.60 1.80 1.30 1.44

KM jam % %

KETERANGAN

Spec. Spec.

% % ton/M3 ton/M3 ton/M3 ton/M3 ton/M3

URUTAN KERJA Semen, pasir dan air dicampur dan diaduk menjadi mortar dengan menggunakan Concrete Mixer Batu dibersihkan dan dibasahi seluruh permukaannya sebelum dipasang Penyelesaian dan perapihan setelah pemasangan PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Batu -----> Semen ---->

1.c.

Pasir

2. 2.a.

ALAT CONCRETE MIXER Kapasitas Alat Faktor Efisiensi Alat Waktu siklus : - Memuat - Mengaduk - Menuang - Tunggu, dll.

----->

{(Bt x D1 x 1 M3) : D2} x 1.20 Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 x {D5 x (1000)} Ps x {(Mr x D1 x 1 M3) : D4} x 1.05

(T1 + T2 + T3 + T4)

Kap. Prod. / jam = Koefisien Alat / M3 2.b.

URAIAN ANALISA HARGA SATUAN

URAIAN

I.

III.

Analisa EI-791

V x Fa x 60 1000 x Ts = 1 : Q1

WATER TANK TRUCK Volume Tanki Air Kebutuhan air / M3 beton Faktor Efiesiensi Alat Kapasitas pompa air Kap. Prod. / jam = Koefisien Alat / M3

pa x Fa x 60 1000 x Wc = 1 : Q2

(M02) (M12) (M12) (M01)

1.1700 0.1225 176.00 0.5088

M3 M3 Kg M3

500.00 0.83

liter -

8.00 4.00 3.00 2.00 17.00 1.465

menit menit menit menit menit M3

(E06)

0.6827

jam

(E23) V Wc Fa Pa Q2

4.00 0.007 0.83 100.00 711.43

M3 M3 liter/menit M3

(E23)

0.0014

jam

(E06) V Fa Ts T1 T2 T3 T4 Ts Q1

Lepas

Berlanjut ke hal. berikut. PROYEK JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.9.(1) : Pasangan Batu : M3

No.

2.c.

3.

Analisa EI-791 URAIAN ANALISA HARGA SATUAN Lanjutan

URAIAN

ALAT BANTU Diperlukan : - Sekop - Pacul - Sendok Semen - Ember Cor - Gerobak Dorong

= = = = =

2 2 2 2 1

KODE

Koefisien Tenaga / M3 : - Mandor - Tukang - Pekerja

= (Tk x M) : Qt = (Tk x Tb) : Qt = (Tk x P) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan :

6.

7.

SATUAN

buah buah buah buah buah

TENAGA Produksi menetukan : Produksi Concrete Mxer Produksi Pasangan Batu dengan Mortar / hari = Tk x Q1 Kebutuhan tenaga : - Mandor - Tukang Batu - Pekerja

Rp.

KOEF.

688,665.98 / M3

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............

bulan

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 31.19 M3

Q1 Qt M Tb P

1.465 10.25 1.00 2.00 8.00

M3/Jam M3 orang orang orang

(L03) (L02) (L01)

0.6827 1.3655 5.4618

jam jam jam

KETERANGAN

Analisa EI-791 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 7.9 (1) : Pasangan Batu : M3

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

PERKIRAAN VOL. PE: TOTAL HARGA (Rp.) : % THD. BIAYA PROY :

PERKIRAAN KUANTITAS

jam jam jam

5.4618 1.3655 0.6827

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp. )

12,600.00 14,452.38 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Batu Kali Semen (PC) Pasir

(M02) (M12) (M01)

M3 Kg M3

1.1700 176.0000 0.5088

165,000.00 1,240.00 110,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Conc. Mixer Water Tanker Alat Bantu

(E06) (E23)

jam jam Ls

0.6827 0.0014 1.0000

84,752.41 257,973.69 200.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

2

3 4

31.19 21,479,491.93

68,819.28 19,734.17 11,817.75 100,371.20

193,050.00 218,240.00 55,973.08

467,263.08

57,863.09 362.61 200.00

58,425.71 626,059.98 62,606.00 688,665.98

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.10.(3) a. : Bronjong dengan kawat yang dilapisi galvanis : M3

No.

URAIAN

I. 1 2 3 4 5 6 II. 1 2 3 III. 1. 1.a. 1.b. 2. 2.a.

3.

KOEF.

SATUAN

L Tk Fh

70.00 7.00 1.10

KM jam -

(M15) (M02)

15.00 1.1000

Kg M3

URUTAN KERJA Keranjang kawat bronjong direntangkana dan dibentuk sesuai dengan konstruksi yang diinginkan Batu ditempatkan satu demi satu sehingga rongga sesedikit mungkin Anyaman kawat ditutup dan diikat PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Bronjong dengan kawat dilapisi galvanis Batu ALAT ALAT BANTU Diperlukan : - Tang - Pemotong kawat - Palu pemecah batu

= 2 buah = 2 buah = 2 buah

TENAGA Produksi pekerjaan per hari dibutuhkan tenaga : - Mandor - Tukang - Pekerja

Qt M Tb P

= ( M x Tk ) : Qt = ( Tb x Tk ) : Qt = ( P x Tk ) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

7.

URAIAN ANALISA HARGA SATUAN

KODE

ASUMSI Pekerjaan dilakukan secara manual Lokasi pekerjaan : sepanjang jalan Bronjong dengan kawat dilapisi galvanis diterima seluruhnya di lokasi pekerjaan Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Faktor Kehilangan Material

Koefisien Tenaga / Kg : - Mandor - Tukang - Pekerja

6.

Analisa LI-7103a

594,916.67 / M3

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............ VOLUME PEKERJAAN YANG DIPERLUKAN

bulan

(L03) (L02) (L01)

8.00 1.00 3.00 6.00

0.8750 2.6250 5.2500

M3 orang orang orang

jam jam jam

KETERANGAN

Volume pekerjaan :

155.17 M3

Analisa LI-7103a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 7.10.(3) a. PERKIRAAN VOL. PEK. : Bronjong dengan kawat yang dilapisi galvanis TOTAL HARGA (Rp.) : M3 % THD. BIAYA PROYEK

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

PERKIRAAN KUANTITAS

jam jam jam

5.2500 2.6250 0.8750

: : :

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp. )

12,600.00 14,452.38 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1. 2.

Bronjong dengan kawat dilapisi galvanis Batu

(M02)

Kg M3

15.0000 1.1000

16,000.00 165,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

100.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

2

3 4

155.17 92,313,219.17 0.83

66,150.00 37,937.50 15,145.83 119,233.33

240,000.00 181,500.00

421,500.00

100.00

100.00 540,833.33 54,083.33 594,916.67

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.11 (1a) : Expansion Joint Tipe Asphaltic Plug : M1

No.

URAIAN

I.

III. 1. 1.a. 1.b. 1.c. 1.d. 2. 2.a.

2.b.

2 c. 3

4. 5.

6. 7.

URAIAN ANALISA HARGA SATUAN

KODE

1 2 3 4 5 6

ASUMSI Menggunakan alat (cara mekanik) Lokasi pekerjaan : jembatan Bahan / material diterima seluruhnya di lokasi pekerjaan proyek Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Faktor kehilangan bahan

1 2 3

URUTAN KERJA Material dan peralatan disiapkan Expansion Joint type baja bersudut dipasang dengan seksama Penyelesaian dan perapihan setelah pemasangan

II.

Analisa EI-7111a

L Tk Fb

KOEF.

SATUAN

70.00 7.00 1.20

KM jam

7.020 1.0000 1.0000 1.0000

kg ls ls ls

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Bridging Plate PL 125 x 6 Backer Road Sealed Exp. Gap Asphaltic Plug

(0,125x0,006x1)7800*Fb

ALAT Welding Set Welding Set 1 grup kerja menghasilkan ( Out Put )

Mi Qt

1.00 2.25

Koefisien Mesin Las

= ( Mi : Qt ) x Tk

Kl

3.1111

Tamper Tamper 1 grup kerja menghasilkan ( Out Put ) Koefisien Mesin Las = ( Mi : Qt ) x Tk

S Qt Kl

1.00 2.25 3.1111

buah m/hari

Qt M Tb P

2.25 1.00 2.00 5.00

m orang orang orang

Alat Bantu Alat Pertukangan dan lain lain TENAGA Produksi Pasang Ekspansion Join dalam 1 hari Kebutuhan Tenaga : Mandor Tukang Pekerja Koefisien Tenaga / M3 : - Mandor = (Tk x M) : Qt - Tukang = (Tk x Tb) : Qt - Pekerja = (Tk x P) : Qt HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran. ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKEMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp. 2,103,466 / M MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............ bulan VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : M1

(L03) (L02) (L01)

3.1111 6.2222 15.5556

buah m/hari

jam jam jam

KETERANGAN

Analisa EI-7111a FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

Satker / PPK No. PAKET KONTRAK NAMA PAKET ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : 7.11 (1a) : Expansion Joint Tipe Asphaltic Plug : M1

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN VOL. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

15.5556 6.2222 3.1111

HARGA SATUAN (Rp.)

: : :

JUMLAH HARGA (Rp. )

12,600.00 14,452.38 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1 2 3 4

Bridging Plate PL 125 x 6 Backer Road Sealed Exp. Gap Asphaltic Plug

kg ls ls ls

7.0200 1.0000 1.0000 1.0000

16,000.00 150,000.00 300,000.00 500,000.00

JUMLAH HARGA TENAGA C.

ALAT

1 2 3

Welding Set Tamper Alat Bantu

D. E. F.

JUMLAH HARGA PERALATAN JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

jam jam Ls

3.1111 3.1111 1.0000

-

109,144.76 54,508.76 1,000.00

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

196,000.00 89,925.93 53,851.85 339,777.78

112,320.00 150,000.00 300,000.00 500,000.00 1,062,320.00

339,561.46 169,582.82 1,000.00

510,144.29 1,912,242.06 191,224.21 2,103,466.27

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.13.(1) : Sandaran (Railing) : M1

No.

4 5

ASUMSI Menggunakan alat (cara mekanik) Lokasi pekerjaan : sepanjang jembatan Bahan / material diterima seluruhnya di lokasi pekerjaan proyek Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari

1 2 3

URUTAN KERJA Material dan peralatan disiapkan Railing dipasang dengan seksama Penyelesaian dan perapihan setelah pemasangan

1 2 3

II.

1. 1.a. 1.b. 1.c.

2. 2.a.

3.

5.

6.

7.

KODE

L Tk

KOEF.

0.1 7.00

SATUAN

KM jam

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Pipa Gip. Steve dia = 2,5 " Beton K-350/2m'

(1x2) {(0,16x0,1)x0,55+(0,16+0,25)/2x0,1x0,45}/2

Baja Tulangan ( per 2m' ) dia 13 = ( 3 x 2,53 x 1,043 ) dia 10 = {( 8 x 0,38 ) + ( 4 x 0,46 )} x 0,618

(MXX)

7.91637 3.01584 10.93221

2.000 0.0180 0.0090

M M3/2m' M3/m'

10.9322 5.4661

kg/2m' kg/m'

ALAT Welding Set Welding Set 1 group kerja menghasilkan ( Out Put )

Mi Qt

1.00 15.00

buah M'/hari

Koefisien Welding Set = ( M / Qt ) x Tk

Kl

0.4667

jam

Qt

15.00

M'

M Tb P

1.00 1.00 4.00

orang orang orang

TENAGA Produksi pasang Railling dalam satu hari Kebutuhan Tenaga - Mandor - Tukang - Pekerja Koefisien Tenaga / M3 : - Mandor - Tukang - Pekerja

4.

URAIAN ANALISA HARGA SATUAN

URAIAN

I.

III.

Analisa EI-7131

= (Tk x M) : Qt = (Tk x Tb) : Qt = (Tk x P) : Qt

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran. ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp. 619,359 / M1 MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............ bulan VOLUME PEKERJAAN YANG DIPERLUKAN

(L03) (L02) (L01)

0.4667 0.4667 1.8667

jam jam jam

KETERANGAN

Volume pekerjaan :

0.00 M1

Analisa EI-7131 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

Satker / PPK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 7.13.(1) : Sandaran (Railing) : M1

NO

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

1.8667 0.4667 0.4667

HARGA SATUAN (Rp.)

: : :

JUMLAH HARGA (Rp. )

12,600.00 14,452.38 17,309.52

JUMLAH HARGA TENAGA

B.

BAHAN

1. 2. 3.

Pipa Gip. Steve dia = 2,5 " Beton K-350/2m' Baja Tulangan

M M3 kg

2.0000 0.0090 5.4661

198,900.00 2,053,725.40 10,500.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Welding Set Alat bantu

D. E. F.

JUMLAH HARGA PERALATAN JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

LS LS

0.4667 1.0000

23,520.00 6,744.44 8,077.78

38,342.22

397,800.00 18,483.53 57,394.05 473,677.58

109,144.76 100.00

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

50,934.22 100.00

51,034.22 563,054.02 56,305.40 619,359.42

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.15.(1) : Pembongkaran Pasangan Batu : M3

No.

URAIAN

I. 1 2 3 4 5 6 II. 1 2 3

III.

URUTAN KERJA Bidang yang akan dibongkar ditandai dengan cat/kapur Penggalian dilakukan dengan, Compresor dan Jack Hammer, dimuat ke dlm Truk dengan Loader. Dump Truck membuang material hasil galian keluar lokasi jalan sejauh :

KOEF.

SATUAN

Tk Fk D1

7.0 1.24 2.40

Jam Ton/M3

L

5.00

Km

bk Fa Q1

60.00 0.83 0.830

Menit/M3

1.2048

jam

1.50 0.85 0.80 0.50 98.71

M3

Menit M3

0.0101

jam

3.50 0.83 30.00 40.00 0.71 10.00 7.50 10.00 28.21

M3 KM/Jam KM/Jam menit menit menit menit menit menit

2.08

M3

0.4817

Jam

KETERANGAN

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Tidak ada bahan yang diperlukan

2. 2.a.

ALAT JACK HAMMER ( E26) Kapasitas bongkar Faktor efesiensi Kapasitas prod/jam = Fa x 60 bk Koefesien alat/M3 = 1 : Q1 WHEEL LOADER Kapasitas bucket Faktor bucket Faktor efesiensi alat Waktu muat.siklus Kapasitas prod/jam = Koefesien alat/M3 =

2.c.

URAIAN ANALISA HARGA SATUAN

KODE

ASUMSI Pekerjaan dilakukan secara manual Lokasi pekerjaan : sepanjang jalan Kondisi Jalan : sedang / baik Jam kerja efektif per-hari Faktor pengembangan bahan Berat volume beton lepas

1.

2.b.

Analisa EI-7151

(E15) V1 Fb Fa1 Ts1 Q2

V1 x Fb x Fa1 x 60 Fk x Ts1 1 : Q3

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = V : D1 : (V1 x Fb x Fa1) x Ts1 - Waktu tempuh isi = (L : v1) x 60 - Waktu tempuh kosong = (L : v2) x 60 - Lain-lain

Kapasitas Produksi / Jam =

Koefisien Alat / m3

= 1 : Q3

V x Fa x 60 D1 x Fk x Ts2

(E08) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

Q3

(E08)

(padat)

M3

(padat)

padat

Berlanjut ke halaman berikut ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 7.15.(1) : Pembongkaran Pasangan Batu : M3

No.

2.d.

3.

URAIAN

KOEF.

SATUAN

ALAT BANTU Diperlukan alat-alat bantu kecil - Pahat / Tatah = 2 buah - Palu Besar = 2 buah

= (Tk x P) : Qt = (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

KETERANGAN

Lump Sump

Koefisien tenaga / M3 : - Pekerja - Mandor

7.

URAIAN ANALISA HARGA SATUAN Lanjutan KODE

TENAGA Produksi menentukan : JACK HAMMER Produksi Galian / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor

6.

Analisa EI-7151

354,708.51 / M3

WAKTU PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan : ............

bulan

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan : 0.00 M3

Q1 Qt

0.83 5.81

M3/Jam M3

P M

8.00 1.00

orang orang

(L01) (L03)

9.6386 1.2048

Jam Jam

Analisa EI-7151 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 7.15.(1) : Pembongkaran Pasangan Batu : M3

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

B.

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

SATUAN

(L01) (L03)

PERKIRAAN KUANTITAS

Jam Jam

9.6386 1.2048

: : :

HARGA SATUAN (Rp.)

12,600.00 17,309.52

JUMLAH HARGA (Rp.)

121,445.78 20,854.85

JUMLAH HARGA TENAGA

142,300.63

JUMLAH HARGA BAHAN

0.00

BAHAN

C.

PERALATAN

1 2 3 4

Jack Hammer Wheel Loader Dump Truck Alat bantu

E26 E15 E08

Jam Jam Jam Ls

1.2048 0.0101 0.4817 1.0000

36,099.04 309,926.83 277,180.19 0.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

2

3 4

43,492.82 3,139.78 133,529.05 0.00

180,161.65 322,462.28 32,246.23 354,708.51

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

URAIAN

I. 1 2 3 4 5 6 7 8

9

10 11 II. 1 2

3 4

III. 1. 1.a. 1.b. 1.c. 1.d. 2. 2.a.

: 8.1 (5) : Camp. Aspal Panas Utk.Pek.Minor : M3

Analisa EI-815 URAIAN ANALISA HARGA SATUAN

KODE

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal Lapis Hotmix padat untuk patching Jam kerja efektif per-hari Faktor kehilangan material : - Agregat - Aspal Komposisi campuran ATB : - Coarse Agregat - Fine Agregat - Fraksi Filler - Asphalt minimum 6 % Berat jenis bahan : - ATB - Coarse Agregat & Fine Agregat - Fraksi Filler - Asphalt Jarak stock pile ke cold bin Faktor kembang

KOEF.

SATUAN

L t Tk Fh1 Fh2

70.0 0.04 7.00 1.10 1.05

KM M Jam -

CA FA FF As

55.00 37.50 1.00 6.50

% % % %

D1 D2 D3 D4 l Fk

2.30 1.80 2.00 1.03 100.00 1.20

ton / M3 ton / M3 ton / M3 ton / M3 m

(M03) (M04) (M05) (M10)

0.7731 0.5271 25.300 157.0

M3 M3 Kg Kg

1.50 0.85 0.83 15.00 20.00

M3 km/jam km/jam

0.70 0.75 1.45 33.17

menit menit menit M3

0.0301

Jam

URUTAN KERJA Wheel Loader memuat Agregat ke dalam Cold Bin AMP Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung kedalam Dump Truck dan diangkut ke lokasi pekerjaan Campuran panas ATB dihampar dengan manual dan dipadatkan dengan Pedestrian Roller Sekelompok pekerja membuat galian lubang/patching, merapikan tepi hamparaan dengan menggunakan Alat Bantu PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 Agregat Halus = (FA x (D1 x 1M3) x Fh1) : D2 Filler = (FF x (D1 x 1M3) x Fh1) x 1000 Aspal = (AS x (D1 x 1M3) x Fh2) x 1000 ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor efisiensi alat Kecepatan maju (ke bin) Kecepatan kembali (ke stock pile) Waktu Siklus - Muat = l x 60 - Lain lain 1000 x Vf Kap. Prod. / jam =

+ l x 60 1000 x Vr

V x Fb x Fa x 60 Fh1 x Ts1xFk Koefisien Alat/M3 = 1 : Q1

(E15) V Fb Fa Vf Vr Ts1 T1 T2 Ts1 Q1 (E15)

KETERANGAN

Rata-rata

Gradasi harus memenuhi Spesifikasi

Berlanjut ke halaman berikut ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 8.1 (5) : Camp. Aspal Panas Utk.Pek.Minor : M3

No.

2.b.

2.c.

2.d.

URAIAN

3.

KODE

KOEF.

SATUAN

(E01) V Fa Q2

60.0 0.83 18.04

ton / Jam M3

(E01)

0.0554

Jam

GENERATORSET ( GENSET ) Kap.Prod. / Jam = SAMA DENGAN AMP Koefisien Alat/M3 = 1 : Q3

(E12) Q3 (E12)

18.04 0.0554

M3 Jam

DUMP TRUCK (DT) Kapasitas bak Faktor Efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Kapasitas AMP / batch Waktu menyiapkan 1 batch AC Waktu Siklus - Mengisi Bak = (V : Q2b) x Tb - Angkut = (L : v1) x 60 menit - Tunggu + dump (setempat2) + Putar - Kembali = (L : v2) x 60 menit

(E09) V Fa v1 v2 Q2b Tb Ts2 T1 T2 T3 T4 Ts2 Q4

10.00 0.83 20.00 30.00 1.00 1.00

Ton KM / Jam KM / Jam Ton menit

10.00 210.00 25.00 140.00 385.00 0.47

menit menit menit menit menit M3

Koefisien Alat/M3 = 1 : Q4

(E09)

2.1337

Jam

PEDESTRIAN ROLLER Kecepatan rata-rata alat Lebar efektif pemadatan Jumlah lintasan Faktor Efisiensi alat Kap. Prod. / jam =

(E17) v b n Fa Q5

1.50 0.61 6.00 0.83 5.06

(E17)

0.1975

V x Fa x 60 D1 x Ts2 x Fk

(v x 1000) x b x t x Fa n

Koefisien Alat/M3 = 1 : Q5 2.h.

URAIAN ANALISA HARGA SATUAN Lanjutan

ASPHALT MIXING PLANT (AMP) Kapasitas produksi Faktor Efisiensi alat Kap.Prod. / jam = V x Fa D1 x Fk Koefisien Alat/M3 = 1 : Q2

Kap.Prod. / jam =

2.e.

Analisa EI-815

Km / Jam M lintasan M3 Jam

ALAT BANTU diperlukan : - Kereta dorong = 2 buah - Sekop, Garpu = 5 buah - Pacul, Linggis = 4 buah - Tongkat Kontrol ketebalan hanparan TENAGA Produksi menentukan : AMP Produksi ATB / hari = Tk x Q6 Kebutuhan tenaga : - Pekerja - Mandor Koefisien Tenaga / M3 :

KETERANGAN

Lump Sum

Q6 Qt

18.04 126.30

M3 / Jam M3

P M

20.00 2.00

orang orang

- Pekerja - Mandor

= (Tk x P) / Qt = (Tk x M) / Qt

(L01) (L03)

1.1084 0.1108

Jam Jam Berlanjut ke halaman berikut

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 8.1 (5) : Camp. Aspal Panas Utk.Pek.Minor : M3

URAIAN

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

2,832,808.30 / M3.

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksanaan. . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerjaan 0.00 M3

Analisa EI-815 URAIAN ANALISA HARGA SATUAN Lanjutan KODE

KOEF.

SATUAN

KETERANGAN

Analisa EI-815 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 8.1 (5) : Camp. Aspal Panas Utk.Pek.Minor : M3

NO

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

SATUAN

(L01) (L03)

Jam Jam

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

1.1084 0.1108

HARGA SATUAN (Rp.)

: : :

JUMLAH HARGA (Rp. )

12,600.00 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3 4

Agregat Kasar Agregat Halus Filler Aspal

(M03) (M04) (M05) (M10)

M3 M3 Kg Kg

0.7731 0.5271 25.3000 156.9750

135,242.03 152,863.04 900.00 11,000.00

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5. 6.

PERALATAN Wheel Loader AMP Genset Dump Truck Pedestrian Roller Alat Bantu

E15 E01 E12 E09 E24

Jam Jam Jam Jam Jam Ls

0.0301 0.0554 0.0471 0.4010 0.1975 1.0000

309,926.83 6,912,959.81 442,478.14 506,919.91 88,360.73 100.00

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

13,966.27 1,918.65

15,884.91

104,549.60 80,571.56 22,770.00 1,726,725.00

1,934,616.16

9,342.47 383,127.89 20,844.45 203,254.61 17,452.25 100.00

624,779.20 2,575,280.27 257,528.03 2,832,808.30

ITEM PEMBAYARAN NO. : 8.4.(1) JENIS PEKERJAAN : Marka Jalan Termoplastik SATUAN PEMBAYARAN : M2

No.

1 2 3 4 5 6 7 8 9 II. 1 2 3

1. 1.a. 1.b. 1.c. 2. 2.a.

2.c.

3.

KODE

ASUMSI Pekerjaan dilakukan secara manual Lokasi pekerjaan : sepanjang jalan Bahan dasar (besi dan kawat) diterima seluruhnya di lokasi pekerjaan Jarak rata-rata Base camp ke lokasi pekerjaan Jam kerja efektif per-hari Faktor Kehilangan Material Tebal lapisan cat secara manual Berat Jenis Bahan Cat Perbandingan pemakaian bahan : - Cat - Thinner URUTAN KERJA Permukaan jalan dibersihkan dari debu/kotoran Cat disemprotkan dengan Compressor di atas maal tripleks yang dipasang di permukaan jalan Glass Beat ditaburkan segera setelah cat marka selesai disemprotkan

KOEF.

SATUAN

KETERANGAN

Spec.10.4.3(2)(d)

L Tk Fh t BJ.Cat C T

70.00 7.00 1.05 0.02 1.00 65.00 35.00

KM jam M Kg/Liter % %

(M17b) (M33) (M34)

1.9500 1.0500 0.4500

Kg Liter Kg

(E05) V R

40.00 3.00

Ltr/Jam Ltr/M2

Q1

13.333

M2/Jam

Koef. Alat / = 1 : Q1

(E05)

0.0750

Jam

DUMP TRUCK Pada dasarnya alat ini digunakan bersama-sama dengan Compressor Koef. Alat / = 1 : Q3

(E08) 13.333 0.0750

M2/Jam Jam

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Cat Marka Thermoplastic Minyak Pencair (Thinner) Glass Bead ALAT COMPRESSOR Kapasitas penyemprotan Jumlah cat ca(1 M x 1 M) x t x 1000 Kap. Prod. /

2.b.

URAIAN ANALISA HARGA SATUAN

URAIAN

I.

III.

Analisa EI-841

= C x R x (BJ.Cat) = TxR

V:R

ALAT BANTU Diperlukan : - Sapu Lidi - Sikat Ijuk - Rambu-rambu pengaman - Maal Tripleks

Ls = = = =

3 3 2 4

buah buah buah lembar

TENAGA Produksi pekerjaan per hari = Q1 x Tk dibutuhkan te- Mandor - Tukang Cat - Pekerja Koefisien Tenaga / M2 : - Mandor - Tukang - Pekerja

Q3 (E08)

= ( M x Tk ) : Qt = ( Tb x Tk ) : Qt = ( P x Tk ) : Qt

Qt M Tb P

93.33 1.00 3.00 8.00

M2 orang orang orang

(L03) (L02) (L01)

0.0750 0.2250 0.6000

jam jam jam

Berlanjut ke hal. berikut. ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 8.4.(1) : Marka Jalan Termoplastik : M2

URAIAN

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN Lihat perhitungan dalam FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN. Didapat Harga Satuan Pekerjaan : Rp.

175,253.43 / M2

6.

MASA PELAKSANAAN YANG DIPERLUKAN Masa Pelaksa. . . . . . . . . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN Volume pekerj 0.00 M2

Analisa EI-841 URAIAN ANALISA HARGA SATUAN Lanjutan KODE

KOEF.

SATUAN

KETERANGAN

Analisa EI-841 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 8.4.(1) : Marka Jalan Termoplastik : M2

NO.

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

PERKIRAAN KUANTITAS

jam jam jam

0.6000 0.2250 0.0750

HARGA SATUAN (Rp.)

12,600.00 14,452.38 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3.

Cat Marka Thermoplastic Minyak Pencair (Thinner) Glass Bead

M17b M33 M34

Kg Liter Kg

1.9500 1.0500 0.4500

45,000.00 19,000.00 50,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3.

Compressor Dump Truck Alat Bantu

E05 E08

Jam Jam Ls

0.0375 0.0375 1.0000

176,454.51 277,180.19 0.00

UMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

10.0 % x D

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

: : :

JUMLAH HARGA (Rp.)

7,560.00 3,251.79 1,298.21 12,110.00

87,750.00 19,950.00 22,500.00

130,200.00

6,617.04 10,394.26 0.00

17,011.30 159,321.30 15,932.13 175,253.43

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.1.(4) a : PEKERJAAN HARIAN : JAM

No.

URAIAN ANALISA HARGA SATUAN

URAIAN

A.

KODE

KOEF.

SATUAN

Pw Cp A W B

DUMP TRUCK 3-4 M3 100.0 3.5 5.0 2,000 250,000,000

HP Ton Tahun Jam Rupiah

KET.

URAIAN PERALATAN 1. 2. 3. 4. 5. 6.

B.

Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat

E08

BIAYA PASTI PER JAM KERJA 1.

Nilai Sisa Ala= 10 % x Harga Alat Baru

C

25,000,000

2.

Faktor Angsuran Modal

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

(B-C)xD W

E

29,677.22

Rupiah

F

250.00

Rupiah

G

29,927.22

Rupiah

=

b. Asuransi, d

0.002 x B W

Biaya Pasti per Jam C.

=

(E+F)

Rupiah -

BIAYA OPERASI PER JAM KERJA 1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

120,000.00

Rupiah

2.

Pelumas

I

72,500.00

Rupiah

Biaya bengke(6.25% dan 8.75%) x B W

J

10,938

Rupiah

3.

Perawatan dan perbaik

K

15,625.00

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Op= ( 1 Orang / Jam ) x U2

L M

15,166.67 13,023.81

Rupiah Rupiah

Biaya Operasi per Jam

P

247,252.98

Rupiah

S

277,180.19

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

(12,5 % - 17,5 %) x B W

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.

LAIN - LAIN 1. 2. 3. 4. 5. 6.

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

Analisa EI-94 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 9.1.(4) a : PEKERJAAN HARIAN DUMP TRUCK 3-4 M3 : JAM E08

NO.

KOMPONEN

A.

PEKERJA

1. 2.

-

B.

BAHAN

1. 2.

-

SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

ALAT

1.

DUMP TRUCK 3-4 M3

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

jam

1.0000

-

-

JUMLAH HARGA BAHAN C.

28.00 8,537,149.94

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA

-

: : :

-

277,180.19

277,180.19

JUMLAH HARGA ALAT

277,180.19

10.0 % x D

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

277,180.19 27,718.02 304,898.21

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.1.(9) : PEKERJAAN HARIAN : JAM

No.

URAIAN ANALISA HARGA SATUAN

URAIAN

A.

KODE

KOEF.

SATUAN

KETERANGAN

URAIAN PERALATAN 1. 2. 3. 4. 5. 6.

B.

Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat

Pw Cp A W B

WHEEL LOADER 1.0-1.6 M3 96.0 HP 1.5 M3 5.0 Tahun 2,000 Jam 429,000,000 Rupiah

BIAYA PASTI PER JAM KERJA 1.

Nilai Sisa Ala= 10 % x Harga Alat Baru

C

42,900,000

2.

Faktor Angsuran Modal

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

(B-C)xD W

E

50,926.10

Rupiah

F

429.00

Rupiah

G

51,355.10

Rupiah

=

b. Asuransi, d

0.002 x B W

Biaya Pasti per Jam C.

=

(E+F)

Rupiah -

BIAYA OPERASI PER JAM KERJA 1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

115,200.00

Rupiah

2.

Pelumas

I

69,600.00

Rupiah

3.

Biaya bengke(6.25% dan 8.75%) x B W

J

18,769

4.

Perawatan dan perbaik

K

26,812.50

Rupiah

5. 6.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Op= ( 1 Orang / Jam ) x U2

L M

15,166.67 13,023.81

Rupiah Rupiah

Biaya Operasi per Jam

P

258,571.73

Rupiah

S

309,926.83

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

(12,5 % - 17,5 %) x B W

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.

LAIN - LAIN 1. 2. 3. 4. 5. 6.

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

(E15)

Analisa EI-99 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 9.1.(9) : PEKERJAAN HARIAN WHEEL LOADER 1.0-1.6 M3 : JAM (E15)

KOMPONEN

A.

SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

: : :

28.00 9,545,746.36

JUMLAH HARGA (Rp.)

PEKERJA

B.

JUMLAH HARGA TENAGA

-

JUMLAH HARGA BAHAN

-

BAHAN

C.

ALAT

1.

WHEEL LOADER 1.0-1.6 M3

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

jam

1.0000

309,926.83

309,926.83

JUMLAH HARGA ALAT

309,926.83

10.0 % x D

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

309,926.83 30,992.68 340,919.51

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.1.(11) : PEKERJAAN HARIAN : JAM

No.

URAIAN ANALISA HARGA SATUAN

URAIAN

A.

KODE

KOEF.

SATUAN

KETERANGAN

URAIAN PERALATAN 1. 2. 3. 4. 5. 6.

B.

Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat

Pw Cp A W B

EXCAVATOR 80-140 HP 133.0 HP 0.9 M3 5.0 Tahun 2,000 Jam 1,050,000,000 Rupiah

BIAYA PASTI PER JAM KERJA 1.

Nilai Sisa Ala= 10 % x Harga Alat Baru

C

105,000,000

2.

Faktor Angsuran Modal

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

(B-C)xD W

E

124,644.31

Rupiah

F

1,050.00

Rupiah

G

125,694.31

Rupiah

=

b. Asuransi, d

0.002 x B W

Biaya Pasti per Jam C.

=

(E+F)

Rupiah -

BIAYA OPERASI PER JAM KERJA 1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

159,600.00

Rupiah

2.

Pelumas

I

96,425.00

Rupiah

Biaya bengke(6.25% dan 8.75%) x B W

J

45,938

Rupiah

3.

Perawatan dan perbaik

K

65,625.00

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Op= ( 1 Orang / Jam ) x U2

L M

15,166.67 13,023.81

Rupiah Rupiah

Biaya Operasi per Jam

P

395,777.98

Rupiah

S

521,472.29

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

(12,5 % - 17,5 %) x B W

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.

LAIN - LAIN 1. 2. 3. 4. 5. 6.

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

(E10)

Analisa EI-911 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 9.1.(11) : PEKERJAAN HARIAN EXCAVATOR 80-140 HP : JAM (E10)

NO.

KOMPONEN

A.

PEKERJA

1. 2.

-

SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

-

BAHAN

1. 2.

-

-

-

ALAT

1.

EXCAVATOR 80-140 HP

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) OVERHEAD & PROFIT HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

jam

1.0000

-

-

-

JUMLAH HARGA BAHAN C.

28.00 16,061,346.40

JUMLAH HARGA (Rp.)

JUMLAH HARGA TENAGA B.

: : :

-

-

521,472.29

521,472.29

JUMLAH HARGA BAHAN

521,472.29

10.0 % x D

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

521,472.29 52,147.23 573,619.51

HARGA DASAR SATUAN UPAH HARGA No.

URAIAN

KODE

SATUAN

SATUAN

KETERANGAN

( Rp.) 1.

Pekerja

(L01)

Jam

12,600.00

80,000.00 / hari

2.

Tukang

(L02)

Jam

14,452.38

100,000.00 / hari

3.

Mandor

(L03)

Jam

17,309.52

120,000.00 / hari

4.

Operator

(L04)

Jam

15,166.67

105,000.00 / hari

5.

Pembantu Operator

(L05)

Jam

13,023.81

90,000.00 / hari

6.

Sopir / Driver

(L06)

Jam

14,452.38

100,000.00 / hari

7.

Pembantu Sopir / Driver

(L07)

Jam

13,023.81

90,000.00 / hari

8.

Mekanik

(L08)

Jam

18,023.81

125,000.00 / hari

9.

Pembantu Mekanik

(L09)

Jam

13,023.81

90,000.00 / hari

10.

Kepala Tukang

(L10)

Jam

15,880.95

110,000.00 / hari

Padang , 11 Februari 2019 Penawar, PT. CITRA PERMATA SULUNG

FARDI MUBAROK Direktur Utama

DAFTAR HARGA DASAR SATUAN BAHAN HARGA No.

URAIAN

KODE

SATUAN

SATUAN

KETERANGAN

( Rp.) 1

Pasir Pasang (Sedang)

M01b

M3

110,000.00 Lokasi Pekerjaan

2

Pasir Beton (Kasar)

M01a

M3

110,000.00 Quarry

3

Pasir Halus (untuk HRS)

M01c

M3

110,000.00 Quarry

4

Pasir Urug (ada unsur lempung)

M01d

M3

100,300.00 Base Camp

5

Batu Kali

M02

M3

165,000.00 Lokasi Pekerjaan

6

Batu Kali

M3

120,000.00 Base Camp

7

Agregat Pecah Kasar

M3

126,431.52 Base Camp

8

Aggregat Kasar

M3

126,431.52 Base Camp

9

Aggregat Halus

M3

112,518.09 Base Camp

10

Lolos screen1 ukuran ( 0 - 5)

M3

152,863.04 Base Camp

11

Lolos screen2 ukuran ( 0 - 5)

M3

152,863.04 Base Camp

12

Lolos screen2 ukuran ( 5 - 9,5)

M3

135,242.03 Base Camp

13

Lolos screen2 ukuran ( 9.5 - 19,0)

M3

121,145.22 Base Camp

14

Filler

M05

Kg

15

Batu Belah / Kerikil

M06

M3

187,200.00 Lokasi Pekerjaan

16

Gravel

M07

M3

218,900.00 Base Camp

17

Bahan Tanah Timbunan

M08

M3

45,000.00 Lokasi Pekerjaan

18

Bahan Pilihan

M09

M3

25,000.00 Lokasi Pekerjaan

19

Aspal

M10

KG

11,000.00 Base Camp

20

Kerosen / Minyak Tanah

M11

LITER

21

Semen / PC (50kg)

M12

Zak

62,000.00 Base Camp

22

Semen / PC (kg)

M12

Kg

1,240.00 Base Camp

23

Besi Beton Polos

M13

Kg

10,500.00 Lokasi Pekerjaan

24

Kawat Beton

M14

Kg

17,500.00 Lokasi Pekerjaan

25

Kawat Bronjong Ukuran SNI

M15

Kg

26

Sirtu

M16

M3

27

Cat Marka (Non Thermoplas)

M17a

Kg

40,000.00 Lokasi Pekerjaan

28

Cat Marka (Thermoplastic)

M17b

Kg

45,000.00 Lokasi Pekerjaan

29

Paku

M18

Kg

17,300.00 Lokasi Pekerjaan

30

Kayu Perancah

M19

M3

2,000,000.00 Lokasi Pekerjaan

31

Bensin

M20

LITER

8,500.00 Base Camp

32

Solar

M21

LITER

10,000.00 Base Camp

33

Minyak Pelumas / Olie

M22

LITER

29,000.00 Base Camp

34

Plastik Filter

M23

M2

15,000.00 Lokasi Pekerjaan

35

Pipa Galvanis Dia. 1.5"

M24

Batang

202,000.00 Lokasi Pekerjaan

36

Pipa Porus

M25

M'

104,184.00 Lokasi Pekerjaan

37

Agr.Base Kelas A

M26

M3

247,159.04 Base Camp/Analisa

38

Agr.Base Kelas B

M27

M3

Base Camp/Analisa

39

Agr.Base Kelas C

M28

M3

Base Camp/Analisa

40

Agr.Base Kelas S

M29

M3

174,288.65 Base Camp/Analisa

41

Geotextile type woven

M30

M2

35,000.00 Lokasi Pekerjaan

42

Aspal Emulsi

M31

Kg

43

Gebalan Rumput

M32

M2

900.00 Base Camp/Analisa

10,000.00 Pertamina

18,500.00 Lokasi Pekerjaan 100,000.00 Base Camp

8,850.00 Base Camp 25,000.00 Lokasi Pekerjaan

44

Glass Bead

M34

Kg

50,000.00 Lokasi Pekerjaan

45

Pelat Rambu (Eng. Grade)

M35a

BH

875,000.00 Lokasi Pekerjaan

HARGA No.

URAIAN

KODE

SATUAN

SATUAN

KETERANGAN

( Rp.) 46

Pelat Rambu (High I. Grade)

M35b

BH

940,000.00 Lokasi Pekerjaan

47

Rel Pengaman (W Beam)

M36

M'

985,000.00 Lokasi Pekerjaan

48

Beton K-250

M37

M3

1,359,789.72 Lokasi Pekerjaan

49

Baja Tulangan

M39a

Kg

10,500.00 Lokasi Pekerjaan

50

Baja Tulangan (Ulir) U32

M39b

Kg

51

Kapur

M40

M3

52

Chipping

M41

M3

287,000.00 Base Camp

53

Chipping (kg)

M41kg

Kg

152.27 Base Camp

54

Cat Minyak

M42

Kg

45,000.00 Base Camp

55

Pemantul Cahaya (Reflector)

M43

Bh.

17,755.00 Base Camp

56

Pasir Urug

M44

M3

100,300.00 Base Camp/Analisa

57

Arbocell

M45

Kg.

104,073.00 Base Camp

58

Baja Bergelombang

M46

Kg

59

Beton K-125

M47

M3

60

Baja Struktur

M48

Kg

15,000.00

61

Baja Struktur BJ 50

Kg

16,000.00

62

Tiang Pancang Baja

M49

Kg

63

Tiang Pancang Beton Pratekan 400

M50

M3

290,000.00 Lokasi Pekerjaan

64

Kawat Las

M51

Dos

330,000.00 Lokasi Pekerjaan

65

Pipa Baja 3"

M52

M

66

Minyak Fluks

M53

Liter

67

Bunker Oil

M54

Liter

10,000.00 Base Camp

68

Asbuton Halus

M55

Ton

9,100,000.00 Base Camp

69

Baja Prategang

M56

Kg

55,000.00 Base Camp

70

Baja Tulangan (Polos) U32

M57a

Kg

71

Baja Tulangan (Ulir) U39

M39c

Kg

11,000.00 Lokasi Pekerjaan

72

Baja Tulangan (Ulir) U48

M39d

Kg

12,500.00 Lokasi Pekerjaan

73

PCI Girder L=17m

M58a

Buah

74

PCI Girder L=20m

M58b

Buah

198,939,168.00 Lokasi Pekerjaan

75

PCI Girder L=25m

M58c

Buah

230,000,000.00 Lokasi Pekerjaan

76

PCI Girder L=30,9m

M58d

Buah

320,000,000.00 Lokasi Pekerjaan

77

PCI Girder L=35m

M58e

Buah

335,800,000.00 Lokasi Pekerjaan

78

PCI Girder L=40m

M58f

Buah

355,900,000.00 Lokasi Pekerjaan

79

PCI Girder L=40,8m

M58f

Buah

369,000,000.00 Lokasi Pekerjaan

80

Beton K-300

M59

M3

1,331,617.27 Analisa

81

Beton K-175

M60

M3

938,025.02 Analisa

82

Cerucuk

M61

M

83

Elastomer

M62

buah

84

Bahan pengawet: kreosot

M63

liter

85

Mata Kucing

M64

buah

280,000

86

Anchorage

M65

buah

3,300,000

87

Anti strpping agent

M66

Kg

88

Bahan Modifikasi

M67

Kg

1,000.00

89

Beton K-500

M68

M3

2,784,090.19

8,200.00 Lokasi Pekerjaan 40,000.00 Hasil Proses

37,300.00 Lokasi Pekerjaan 858,661.81 Analisa

11,700.00 Base Camp

77,500.00 Pelabuhan terdekat 6,237.00 Base Camp

8,100.00 Lokasi Pekerjaan

-

Lokasi Pekerjaan

25,000 Lokasi Pekerjaan 3,651,250 8,067

90

Beton K-400

M69

M3

KODE

SATUAN

2,663,833.27

HARGA No.

URAIAN

SATUAN

KETERANGAN

( Rp.) 91

Ducting (Kabel prestress)

M70

M'

161,610

92

Ducting (Strand prestress)

M71

M'

50,000

93

Beton K-350

M72

M3

2,053,725.40

94

Multipleks 12 mm

M73

Lbr

161,000.00

95

Elastomer jenis 1 (300x350x36)

M74a

buah

862,500.00 Base Camp

96

Elastomer jenis 2 (350x400x39)

M74b

buah

915,224.00 Base Camp

97

Elastomer jenis 3 (300x300x60)

M74c

buah

1,500,000.00 Base Camp

98

Expansion Tipe Joint Asphaltic Plug

M75d

M

2,103,466.27 Base Camp

99

Expansion Join Tipe Rubber

M75e

M

1,200,000.00 Base Camp

100

Expansion Join Baja Siku

M75f

M

366,534.00 Base Camp

101

Marmer

M76

Buah

422,069.00 Base Camp

102

Kerb Type A

M77

Buah

250,000.00 Base Camp

103

Paving Block

M78

Buah

77,000.00 Lokasi Pekerjaan

104

Mini Timber Pile

M79

Buah

29,090.00 Lokasi Pekerjaan

105

Expansion Joint Tipe Torma

M80

M1

106

Strip Bearing

M81

Buah

303,223.00 Lokasi Pekerjaan

107

Joint Socket Pile 35x35

M82

Set

786,382.00 Lokasi Pekerjaan

108

Joint Socket Pile 16x16x16

M83

Set

72,725.00 Lokasi Pekerjaan

109

Mikro Pile 16x16x16

M84

M1

65,452.00 Lokasi Pekerjaan

110

Matras Concrete

M85

Buah

405,000.00 Lokasi Pekerjaan

111

Assetilline

M86

Botol

229,500.00 Lokasi Pekerjaan

112

Oxygen

M87

Botol

114,750.00 Lokasi Pekerjaan

113

Batu Bara (Kalori min 5800 kkal/gr)

M88

Kg

722.00 Lokasi Pekerjaan

114

Pipa Galvanis Dia 2,5"

M24a

M

198,900.00 Lokasi Pekerjaan

115

Pipa Galvanis Dia 75 mm

M24b

M

260,000.00 Lokasi Pekerjaan

116

Agregat Pecah Mesin 0-5 mm

M91

M3

318,176.83 Base Camp

117

Agregat Pecah Mesin 5-10 & 10-20 mm

M92

M3

318,176.83 Base Camp

118

Agregat Pecah Mesin 20-30 mm

M93

M3

318,176.83 Base Camp

119

Joint Sealent

M94

Kg

84,100.00 Lokasi Pekerjaan

120

Cat Dasar Anti Karat

M95

Kg

115,000.00 Lokasi Pekerjaan

121

Expansion Cap

M96

M2

45,000.00 Lokasi Pekerjaan

122

Polytene 125 mikron

M97

Kg

55,231.00 Lokasi Pekerjaan

123

Curing Compound

M98

Ltr

75,210.00 Lokasi Pekerjaan

124

Kayu Kelas 1

M3

4,000,000.00 Lokasi Pekerjaan

125

Additive Beton

M67a

Kg

65,000.00 Lokasi Pekerjaan

126

Casing

M100

M2

210,000.00

127

Pasir Tailing

M3

287,674.00 Base Camp

128

Polimer

129

Kerb jenis 1

Buah

45,000.00

130

Kerb jenis 2

Buah

50,000.00

131

Kerb jenis 3

Buah

59,257.00

132

Bahan Modifikasi

1,554,992.00 Lokasi Pekerjaan

45,000.00 Base Camp

Kg

75,000.00 Lokasi Pekerjaan

133

Aditif anti pengelupasan

Kg

65,000.00 Lokasi Pekerjaan

134

Bahan Pengisi (Filler) Tambahan

Kg

1,240.00 Lokasi Pekerjaan

135

Asbuton yang diproses

Kg

9,100.00 Lokasi Pekerjaan

HARGA No.

URAIAN

KODE

SATUAN

SATUAN

KETERANGAN

( Rp.) 136

Elastomer Alam

Kg

137

Elastomer Sintesis

Kg

30,000.00 30,000.00

138

- hidup

bh

750,000.00

139

- mati

bh

400,000.00

140

- Baja Prategang

Kg

55,000.00

141

- Grouting

M2

142

Angkur Kabel Prategang, Tipe...............

143

Angkur Kabel Prategang, Tipe............

144

Baja Profil

Kg

145

Baja Tulangan BJTP 24 (epoxy coated)

Kg

146

Epoxy coated

Kg

147

Cairan Perekat (Epoxy Resin)

Kg

148

Epoxy Bahan Penutup (sealant)

Kg

149

Alat Penyuntik Anti Gravitasi

Kg

-

150

Polymer Mortar

Kg

-

151

Anti Korosif Baja

Kg

-

152

Acuan/multipleks

M3

-

153

Concrete Grouting

Kg

-

154

Pelat Baja

Kg

-

155

Baut Angkur

Kg

-

156

Pipa Aluminium

M'

-

157

Cat Galvanis

158

Baut Mutu Tinggi

159 160

M2 buah

84,100.00

Kg

-

Buah

-

Baja Struktur Titik leleh 2500 kg/cm2

Kg

-

Baja Struktur Titik leleh 2800 kg/cm2

Kg

-

161

Baja Struktur Titik leleh 3500 kg/cm2

Kg

-

162

Bahan Grouting

Kg

-

163

Kayu Kelas 1

Kg

-

164

Pelat Baja (Klem)

Kg

-

165

Timbunan Porous

M3

-

166

Bahan pengaman tebing galian (kayu)

M3

-

167

Bahan Curing

M2

-

168

Gelagar baja

Kg

-

169

Fibre jenis e-glass

M2

-

170

Bahan Geosynthetic

M2

-

171

Bahan Baja Profil

Kg

-

172

Bahan Baja Profil, Mutu BJ 32

Kg

-

173

Bahan Baja Profil, Mutu BJ 41

Kg

-

174

Bahan Baja Profil, Mutu BJ 52

Kg

-

175

Petrolium jelly

Kg

-

176

Bahan anti rayap

Kg

-

177

Pelat Baja Galvanis

Kg

-

178

Baja Struktur Lantai Ortotropik

Kg

179

Aspal Modifikasi

kg

7,800.00

HARGA No.

URAIAN

KODE

SATUAN

SATUAN

KETERANGAN

( Rp.) 180

PCI Girder L=45m

181

Multiplek/Venolite 22 mm

Buah Lbr

182

Ampelas

Lbr

2,500.00 Lokasi Pekerjaan

183

Ampelas Besi

Lbr

6,000.00 Lokasi Pekerjaan

184

Alumunium Epoxymastic

Ltr

198,000.00 Lokasi Pekerjaan

185

Polyurethane Alkyd Copoymer

Ltr

265,000.00 Lokasi Pekerjaan

186

Pohon Pelindung

M2

135,000.00 Lokasi Pekerjaan

187

Tanah Humus

M3

85,000.00 Lokasi Pekerjaan

188

Pupuk

Kg

25,000.00 Lokasi Pekerjaan

189

Strand ground Anchore

Kg

88,000.00 Lokasi Pekerjaan

190

Up Lift Anchores 11 Strand

191

Corruqeted Polythylene

192 193

Buah

337,530,141.67 Lokasi Pekerjaan 205,000.00

3,150,000.00 Lokasi Pekerjaan

M`

175,000.00 Lokasi Pekerjaan

HDPE 14/16 mm

M`

68,000.00 Lokasi Pekerjaan

Spesial Grase Anti Korosi

Kg

45,000.00 Lokasi Pekerjaan

194

Anfo

Kg

175,000.00 Base Camp

195

Dinamit

Kg

200,000.00 Base Camp

196

Detonator

Unit

27,500.00 Base Camp

197

Couting Finish Beton

Ltr

250,000.00 Lokasi Pekerjaan

198

Kawat Terames

Unit

458,500.00 Lokasi Pekerjaan

199

Wiremesh Spasi 15 x 15 cm Type M4 Dia. 4 mm

Lbr

157,800.00 Lokasi Pekerjaan

200

Wiremesh Spasi 15 x 15 cm Type M5 Dia. 5 mm

Lbr

246,500.00 Lokasi Pekerjaan

201

Wiremesh Spasi 15 x 15 cm Type M6 Dia. 6 mm

Lbr

355,000.00 Lokasi Pekerjaan

202

Wiremesh Spasi 15 x 15 cm Type M7 Dia. 7 mm

Lbr

483,500.00 Lokasi Pekerjaan

203

Wiremesh Spasi 15 x 15 cm Type M8 Dia. 8 mm

Lbr

630,750.00 Lokasi Pekerjaan

204

Wiremesh Spasi 15 x 15 cm Type M9 Dia. 9 mm

Lbr

801,800.00 Lokasi Pekerjaan

205

Wiremesh Spasi 15 x 15 cm Type M10 Dia. 10 mm

Lbr

985,000.00 Lokasi Pekerjaan

206

Wiremesh Spasi 15 x 15 cm Type M11 Dia. 11 mm

Lbr

1,193,000.00 Lokasi Pekerjaan

207

Wiremesh Spasi 15 x 15 cm Type M12 Dia. 12 mm

Lbr

1,420,000.00 Lokasi Pekerjaan

208

Baja T 12 mm

Kg

209

Deck Drain + Aksesoris

Bh

1,150,000.00

210

Dinding Modular

M2

1,250,000.00

11,000.00 Pabrik

211

Electrode

Kg

212

Rel Pengaman (Three Beam)

M`

1,250,000.00 Lokasi Pekerjaan

213

Cat Tembok

Kg

20,000.00 Lokasi Pekerjaan

214

Thinner Galvanis

Ltr

66,000.00 Lokasi Pekerjaan

215

Besi Beton Ulir

216

Elastomer Type 3 (450x500x60)

Buah

2,990,000.00 Base Camp

217

Elastomer Type 3 (500x500x67)

Buah

3,651,250.00 Base Camp

Kg

75,000.00

14,000.00 Lokasi Pekerjaan

218

Kawat Beronjong yang dilapisi Galvanis

Kg

16,000.00 Lokasi Pekerjaan

219

Backer Road

Ls

150,000.00 Lokasi Pekerjaan

220

Sealed Exp. Gap

Ls

300,000.00 Lokasi Pekerjaan

221

Asphaltic Plug

Ls

500,000.00 Lokasi Pekerjaan

222

Floor Deck t = 1,2 mm H = 75 mm

Kg

22,000.00 Lokasi Pekerjaan

HARGA No.

URAIAN

KODE

SATUAN

SATUAN

KETERANGAN

( Rp.) 223

Cat Epoxy

Kg

210,000.00 Lokasi Pekerjaan

224

Deck Drain + Aksesoris

Unit

1,600,000.00 Lokasi Pekerjaan

142

Lampu Jalan Lengan Tunggal Type LED

Buah

32,500,000.00 Lokasi Pekerjaan

143

Aspal Emulsi (AE CQS-1P)

Kg

20,000.00 Lokasi Pekerjaan

144

Asbuton Matic Emulsi

Kg

7,000.00 Lokasi Pekerjaan

145

Air

Kg

1,000.00 Lokasi Pekerjaan

146

Tack Coat - Asphalt Emulsi (AE CSS -1R)

Kg

11,000.00 Lokasi Pekerjaan

147

Amplas

Lbr

2,000.00 Lokasi Pekerjaan

148

Additif (Bahan Tambahan Untuk Seal Coat)

Ltr

95,000.00 Lokasi Pekerjaan

Padang , 11 Februari 2019 Penawar, PT. CITRA PERMATA SULUNG

FARDI MUBAROK Direktur Utama

ANALISA K3 Satker / PPK No. Paket Kontrak Nama Paket Prop / Kab / Kodya

NO

1 2 3 4

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

JENIS PERALATAN

Helmet Rompi Sepatu Dll

SATUAN

Buah Buah Buah Buah

Total

HARGA

KET

25,000.00 50,000.00 250,000.00 25,000.00 350,000.00

Periode Konstruksi Jam Pemakaian

Hari jam

300.00 7.00

Koefesian

Jam

166.67

Padang, 11 Februari 2019 Penawar , PT. CITRA PERMATA SULUNG

FARDI MUABAROK Direktur Utama

HARGA & JARAK RATA-RATA DARI SUMBER BAHAN (QUARRY) No.

1.

URAIAN

SATUAN

HARGA ROYALTY

JARAK QUARRY

(Rp)

( Km )

2.

M01 - P a s i r Pasang M01 - P a s i r Beton M02 - Batu Kali

M3 M3 M3

45,000.00 40,000.00 55,000.00

10.00 10.00 10.00

3.

M06 - Batu Belah/Batu Quarry Besar

M3

9,000.00

15.00

4.

M07 - G r a v e l

M3

8,000.00

15.00

5.

M10 - Aspal Cement (Pelabuhan)

KG

6.

M16 - S i r t u

M3

17,500.00

10.00

7.

M44 - Pasir Urug

M3

18,000.00

10.00

8

M08 - Tanah Timbun

M3

10,000.00

5.00

9

M09 - Material Pilihan

M3

18,000.00

10.00

190.00

ATA RRY) KET.

Ke Base Camp Ke Lokasi Pek. Ke Lokasi Pek. Ke Lokasi Pek. Ke Base Camp Ke Base Camp Ke Lokasi Pek. Ke Lokasi Pek. Ke Lokasi Pek. Ke Lokasi Pek.

Lokasi Quarry Patumbak

Medan -- Gravel Batu Kali km 000+000- Batu Belah

Tanah Timbun = 10.00 km Tanah Pasir = 30.00 km

Jawa /Kisaran Pematangsiantar - Sp. Kawat

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M01a - Pasir Pasang Lokasi : Quarry Tujuan : Base Camp

No.

URAIAN

I. 1 2 3 4 5 6 7 II. 1 2 3

III.

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi Base Camp Harga satuan pasir di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume pasir

KODE

L RpM01 RpE10 RpE09 Bil

KOEF.

SATUAN

10.00 1.00 1.00 1.00 1.40

Km M3 Jam Jam ton/m3

0.93 0.90 0.83

M3 -

0.50 0.50 1.00

menit menit menit

URUTAN KERJA Pasir digali dengan Excavator Excavator sekaligus memuat pasir hasil galian ke dalam Dump Truck Dump Truck mengangkut pasir ke lokasi Base Camp PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

41.6826 M3 / Jam

12,510.55

Rupiah

10.00 0.83 20.00 30.00

ton KM/Jam KM/Jam

10.28 30.00 20.00 1.00 61.28

menit menit menit menit menit

Kisaran Pematangsiantar - Sp. Kawat

BAHAN

ke Tanjung Balai

HARGA SATUAN (Rp.)

45,000.00 521,472.29 506,919.91

Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M01a - Pasir Pasang Lokasi : Quarry Tujuan : Base Camp

No.

IV.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Rp2

87,331.20

Rupiah

M01

144,841.75

Rupiah

M01

144,800.00

Rupiah

5.80 M3 / Jam

HARGA SATUAN DASAR BAHAN DI LOKASI BASE CAMP Harga Satuan Dasar Pasir = ( RpM01 + Rp1 + Rp2 ) Dibulatkan :

BAHAN

Lanjutan HARGA SATUAN (Rp.)

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M02 - Batu Kali Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

URAIAN

I. 1 2 3 4 5 6 7 II. 1 2 3

III.

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke Lokasi Pekerjaan Harga satuan batu kali di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume batu kali

KODE

L RpM02 RpE10 RpE09 Bil

KOEF.

SATUAN

10.00 1.00 1.00 1.00 1.44

Km M3 Jam Jam ton/m3

0.93 0.75 0.83

M3 -

0.75 0.50 1.25

menit menit menit

URUTAN KERJA Batu kali digali dengan Excavator Excavator sekaligus memuat batu kali hasil galian ke dalam Dump Truck Dump Truck mengangkut batu kali ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4

27.7884 M3 / Jam

18,765.83

Rupiah

10.00 0.83 20.00 30.00

ton KM/Jam KM/Jam

14.99 30.00 20.00 1.00

menit menit menit menit

Ts2

65.99

menit

BAHAN

HARGA SATUAN (Rp.)

55,000.00 521,472.29 506,919.91

Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M02 - Batu Kali Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

IV.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Rp2

96,733.90

Rupiah

M02

170,499.73

Rupiah

M02

170,500.00

Rupiah

5.24 M3 / Jam

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar Batu kali = ( RpM02 + Rp1 + Rp2 ) Dibulatkan :

BAHAN

Lanjutan HARGA SATUAN (Rp.)

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M06 - Batu Belah Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

URAIAN

I. 1 2 3 4 5 6 7 8 9 II. 1 2 3

III. 3.a

3.b

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke Lokasi Pekerjaan Harga satuan batu kali di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Harga Satuan Dasar Wheel Loader Harga Satuan Upah Pekerja Berat volume batu belah

KODE

L RpM06 RpE10 RpE09 RpE15 RpL01 Bil

KOEF.

SATUAN

15.00 1.00 1.00 1.00 1.00 1.00 1.60

Km M3 Jam Jam Jam Jam ton/m3

0.93 0.75 0.83

M3 -

0.75 0.50 1.25

menit menit menit

URUTAN KERJA Batu kali digali dengan Excavator Batu kali dibelah oleh Pekerja Dengan Wheel Loader batu belah dimuat ke Dump Truck yang mengangkut batu belah ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

WHEEL LOADER Kapasitas Bucket Faktor Bucket Faktor Efisiensi Alat Waktu sklus - Muat - Lain-lain

(E15) V Fb Fa Ts1 T1 T2 Ts1

Kapasitas Produksi / Jam = V x Fb x Fa x 60

Q2

27.7884 M3 / Jam

18,765.83

Rupiah

1.50 0.75 0.83

M3 -

0.75 0.50 1.25

menit menit menit

44.82 M3 / Jam

Ts1 Biaya Excavator / M3 = (1 : Q2) x RpE15

Rp2

6,914.92

Rupiah

BAHAN

HARGA SATUAN (Rp.)

9,000.00 521,472.29 506,919.91 309,926.83 12,600.00

Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M06 - Batu Belah Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

3.c

3.d

IV.

URAIAN

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

KODE

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q3

Biaya Dump Truck / M3 = (1 : Q3) x RpE08

Rp3

KOEF.

SATUAN

10.00 0.83 20.00 30.00

ton KM/Jam KM/Jam

13.49 45.00 30.00 1.00 89.49

menit menit menit menit menit

3.48 M3 / Jam

145,756.52

Rupiah

PEKERJA Produksi menentukan : Excavator Hasil galian batu / hari = Q1 x 7 Jam Kebutuhan Pekerja

Q1 Qt P

27.7884 M3 / Jam 194.5188 M3 / 7 jam 15.00 Orang

Biaya Pekerja / M3 = { (7 Jam x P) : Qt } x RpL01

Rp4

6,801.40

Rupiah

M06

187,238.67

Rupiah

M06

187,200.00

Rupiah

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar Batu belah = ( RpM06 + Rp1 + Rp2 + Rp3 + Rp4 ) Dibulatkan :

BAHAN

Lanjutan HARGA SATUAN (Rp.)

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M07 - Gravel Lokasi : Quarry Tujuan : Base Camp

No.

URAIAN

I. 1 2 3 4 5 6 7 II. 1 2 3

III.

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke Lokasi Pekerjaan Harga satuan Gravel di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume gravel

KODE

L RpM07 RpE10 RpE09 Bil

KOEF.

SATUAN

15.00 1.00 1.00 1.00 2.20

Km M3 Jam Jam ton/m3

0.93 0.75 0.83

M3 -

0.75 0.50 1.25

menit menit menit

URUTAN KERJA Gravel digali dengan Excavator Excavator sekaligus memuat gravel hasil galian ke dalam Dump Truck Dump Truck mengangkut gravel ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60

(E09) V Fa v1 v2 Ts2 T1 T2 T3

27.7884 M3 / Jam

18,765.83

Rupiah

10.00 0.83 20.00 30.00

ton KM/Jam KM/Jam

9.81 45.00 30.00

menit menit menit

- Lain-lain

T4 Ts2

1.00 85.81

menit menit

BAHAN

HARGA SATUAN (Rp.)

8,000.00 521,472.29 506,919.91

Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M07 - Gravel Lokasi : Quarry Tujuan : Base Camp

No.

IV.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Rp2

192,173.28

Rupiah

M07

218,939.11

Rupiah

M07

218,900.00

Rupiah

2.64 M3 / Jam

HARGA SATUAN DASAR BAHAN DI LOKASI BASE CAMP Harga Satuan Dasar Gravel = ( RpM07 + Rp1 + Rp2 ) Dibulatkan :

BAHAN

Lanjutan HARGA SATUAN (Rp.)

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M16 - Sirtu Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

URAIAN

I. 1 2 3 4 5 6 7 II. 1 2 3

III.

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi Base Camp Harga satuan Sirtu di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume sirtu

KODE

L RpM16 RpE10 RpE09 Bil

KOEF.

SATUAN

10.00 1.00 1.00 1.00 1.51

Km M3 Jam Jam ton/m3

0.93 0.90 0.83

M3 -

0.50 0.50 1.00

menit menit menit

URUTAN KERJA Sirtu digali dengan Excavator Excavator sekaligus memuat sirtu hasil galian ke dalam Dump Truck Dump Truck mengangkut sirtu ke lokasi Base Camp PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

41.6826 M3 / Jam

12,510.55

Rupiah

10.00 0.83 20.00 30.00

ton KM/Jam KM/Jam

9.53 30.00 20.00 1.00 60.53

menit menit menit menit menit

BAHAN

HARGA SATUAN (Rp.)

17,500.00 521,472.29 506,919.91

Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M16 - Sirtu Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

IV.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Rp2

93,041.68

Rupiah

M16

123,052.23

Rupiah

M16

123,100.00

Rupiah

5.45 M3 / Jam

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar Sirtu = ( RpM16 + Rp1 + Rp2 ) Dibulatkan :

BAHAN

Lanjutan HARGA SATUAN (Rp.)

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M44 - Pasir Urug Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

URAIAN

I. 1 2 3 4 5 6 7 II. 1 2 3

III.

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi pekerjaan Harga satuan pasir urug di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume pasir urug

KODE

L RpM44 RpE10 RpE09 Bil

KOEF.

SATUAN

10.00 1.00 1.00 1.00 1.42

Km M3 Jam Jam ton/m3

0.93 0.90 0.83

M3 -

0.50 0.50 1.00

menit menit menit

URUTAN KERJA pasir urug digali dengan Excavator Excavator sekaligus memuat pasir urug hasil galian ke dalam Dump Truck Dump Truck mengangkut pasir urug ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

41.6826 M3 / Jam

12,510.55

Rupiah

10.00 0.83 30.00 35.00

ton KM/Jam KM/Jam

10.14 20.00 17.14 1.00 48.28

menit menit menit menit menit

BAHAN

HARGA SATUAN (Rp.)

18,000.00 521,472.29 506,919.91

Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M44 - Pasir Urug Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

IV.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Rp2

69,785.32

Rupiah

M44

100,295.87

Rupiah

M44

100,300.00

Rupiah

7.26 M3 / Jam

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar pasir urug = ( RpM44 + Rp1 + Rp2 ) Dibulatkan :

BAHAN

Lanjutan HARGA SATUAN (Rp.)

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M1c- Pasir Beton Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

URAIAN

I. 1 2 3 4 5 6 7 II. 1 2 3

III.

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi pekerjaan Harga satuan pasir urug di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat isi volume pasir beton

KODE

L RpM44 RpE10 RpE09 Bil

KOEF.

SATUAN

10.00 1.00 1.00 1.00 1.69

Km M3 Jam Jam ton/m3

0.50 0.90 0.83

M3 -

0.50 0.50 1.00

menit menit menit

URUTAN KERJA pasir urug digali dengan Excavator Excavator sekaligus memuat pasir urug hasil galian ke dalam Dump Truck Dump Truck mengangkut pasir urug ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T1 T2 T4 Ts2

22.41 M3 / Jam

23,269.62

Rupiah

10.00 0.83 20.00 30.00

ton KM/Jam KM/Jam

15.84 30.00 20.00 1.00 66.84

menit menit menit menit menit

BAHAN

HARGA SATUAN (Rp.)

40,000.00 521,472.29 506,919.91

Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M1c- Pasir Beton Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

IV.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Rp2

114,987.11

Rupiah

M44

178,256.73

Rupiah

M44

178,300.00

Rupiah

4.41 M3 / Jam

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar pasir urug = ( RpM44 + Rp1 + Rp2 ) Dibulatkan :

BAHAN

Lanjutan HARGA SATUAN (Rp.)

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M09- Material Pilihan Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

URAIAN

I. 1 2 3 4 5 6 7 II. 1 2 3

III.

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi pekerjaan Harga satuan pasir urug di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat isi volume pasir beton

KODE

L RpM08 RpE10 RpE09 Bil

KOEF.

SATUAN

10.00 1.00 1.00 1.00 2.65

Km M3 Jam Jam ton/m3

0.50 0.90 0.83

M3 -

0.50 0.00 0.50

menit menit menit

URUTAN KERJA pasir urug digali dengan Excavator Excavator sekaligus memuat pasir urug hasil galian ke dalam Dump Truck Dump Truck mengangkut pasir urug ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain

(E10) V Fb Fa Ts1 T1 T2 Ts1

Kap. Prod. / jam = V x Fb x Fa x 60 Ts1

Q1

Biaya Excavator / M3 = (1 : Q1) x RpE10

Rp1

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60

(E09) V Fa v1 v2 Ts2 T1 T1 T2

44.82 M3 / Jam

11,634.81

Rupiah

10.00 0.83 30.00 35.00

ton KM/Jam KM/Jam

5.05 20.00 17.14

menit menit menit

- Lain-lain

T4 Ts2

0.50 42.69

menit menit

BAHAN

HARGA SATUAN (Rp.)

18,000.00 521,472.29 506,919.91

Bersambung

ANALISA HARGA DASAR SATUAN BAHAN Jenis : M09- Material Pilihan Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

IV.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil

Q2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Rp2

115,166.96

Rupiah

M44

144,801.78

Rupiah

M44

144,800.00

Rupiah

4.40 M3 / Jam

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar pasir urug = ( RpM44 + Rp1 + Rp2 ) Dibulatkan :

BAHAN

Lanjutan HARGA SATUAN (Rp.)

Bahan : Aspal No

Uraian Kegiatan

Biaya Rp/satuan Jumlah (Rp)

Jumlah Kombinasi (Rp)

1 Harga di pelabuhan di Pelabuhan Teluk Bayur

Rp/ton

11,700,000.00

11,700,000.00

2 Handling

Rp/ton

0.00

0.00

3 Transport ke proyek

Rp/ton

1,087,500.00

1,087,500.00

4 Pembongkaran, gudang

Rp/ton

0.00

0.00

5 Waste 2%

Rp/ton

234,000.00

234,000.00

subtotal 6 Keuntungan & Overhead 5 % (hanya utk pekerjaan harian)

7 8

Rp/ton

13,021,500.00

Rp/ton

total jumlah

Rp/ton Rp/kg

13,021,500.00 13,021.50

Harga Netto Harga Pembulatan

Rp/kg Rp/kg

13,000.00

Harga distributor di Padang termasuk PPN Harga setelah dikeluarkan PPn Asumsi jarak ke AMP 70-75 km Biaya transport Rp.15 /Km / Kg

13,000.00 1,300.00 11,700.00

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: AGREGAT KASAR & HALUS untuk bahan lapis Agregat dan lapis Aspal : PENGADAAN AGREGAT KASAR & HALUS : M3 URAIAN ANALISA HARGA SATUAN

URAIAN

I 1 2 4

5 6 7 8 9 II 1 2 3 4

6

7

8

9

III 1.a.

KODE

ASUMSI Bahan dasar Sirtu (material Batu bercampur pasir) diterima di lokasi Alat Pemecah Batu (di Base Camp) Kegiatan dilakukan di dalam lokasi Base Camp Berat Isi Bahan : - Batu / Gravel - Pasir - Batu Pecah Harga Satuan Bahan Dasar : - Batu Kali - Sirtu Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Kapasitas Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Faktor Kehilangan Material

D1 D2 D3 Rp1 Rp2 Rp3 Rp4 Cp1 Cp2 Fa1 Fa2 Fh

METHODE PELAKSANAAN Wheel Loader mengangkut Sirtu dari tumpukan dan menuangkannya ke Alat Pemecah Batu. Bahan dasar yang digunakan Sirtu (material Batu bercampur kerikil dan pasir) Dilokasi hooper/Feeder dipasang penyiram air (water sprayer) berfungsi sebagai pencucian bahan dari kotoran (lumpur) Setelah disemprot air Sirtu dimasukkan kedalam pemecah pertama (primary crusher) kapasitas 60 ton/jam (bukaan Jaw 10 cm s.d 20 cm tergantung ukuran boulder) Hasil Primary Crusher disaring memakai Scalping Screen(screen 1) dengan ukuran ayakan #1,5 inch (3,75 cm) atau #2,0 inch (5,00 cm) yg menghasilkan lolos ayakan agregat ukuran (0 - 50) dan tdk lolos agg.(50 - 200) Asumsi material yang lolos saringan (screen1) Asumsi keseluruhannya menghasilkan ukuran (0 - 50) Hasil yang lolos saringan(screen1) sebagai fraksi halus tidak boleh dipakai langsung untuk bahan campuran lapisan perkerasan aspal, tetapi dapat digunakan untuk bahan campuran Agregat kelas B dan S, khusus untuk Agregat A yang digunakan hanya ukuran (0 - 5) Hasil yang tidak lolos screen1 dimasukan ke pemecah kedua (Secondary Crusher) kemudian dipisahkan mempergunakan Screen2 yang menghasilkan ukuran (0 - 5), (5 - 3/8"=9,50mm) dan (3/8" - 3/4"=19mm atau 1"=2,54mm)) yang dapat langsung digunakan untuk kebutuhan Agregat Kasar Lapis pondasi Agregat A (ukuran 5 - 1") dan Agg.Kasar dan Agg.Halus lapisan perkerasan Aspal Asumsi proporsi hasil pemisahan saringan (screen2) - menghasilkan ukuran (0 - 5) - menghasilkan ukuran (5 - 3/8"=9,5mm) - menghasilkan ukuran (3/8" - 3/4"=19mm) Hasil yang tidak lolos dimasukan kedalam pemecah ketiga (Tertiary crusher) atau (secondary Crusher) dan hasilnya dimasukan kembali ke saringan screen2 ANALISA ALAT Kerja Stone Crusher memecah gravel : - Waktu kerja Stone Crusher - Produksi Stone Crusher 1 jam - Kebutuhan batu/gravel 1 jam

= (Fa1 x Cp1) : D3 = (Fa1 x Cp1) : D1

Tst Qb Qg

KOEFISIEN

1.200 1.373 1.232 120,000.00 100,000.00 803,652.59 309,926.83 60.00 1.50 0.70 0.83 1.15

SATUAN

KETERANGAN

Ton/M3 Ton/M3 Ton/M3 Rp./M3 Rp./M3 Rp./Jam Rp./Jam Ton/Jam M3 -

Berongga Berongga Berongga

20.0 8.7

% m3

80.0 39.0

% m3

20.0 30.0 50.0

% % %

1.00 34.09 35.00

Jam M3/Jam M3/Jam

Kap. Bucket

Batu pecah

No.

URAIAN

KODE

KOEFISIEN

SATUAN

KETERANGAN

No.

URAIAN

KODE

KOEFISIEN

SATUAN

KETERANGAN

1.b.

1.c.

1.d.

IV 1

2

III.2.

Kerja Wheel Loader melayani Stone Crusher : - Kap. Angkut / rit = (Fa2 x Cp2) - Waktu Siklus (Muat, Tuang, Tunggu, dll) - Waktu kerja W.Loader memasok gravel = {(Qg : Ka) x Ts} : 60 menit

Ka Ts

1.25 2.00

M3 menit

Tw

0.94

Jam

Biaya Produksi Batu Pecah stone crusher 1 set dgn wheel loader = {(Tst x Rp3) + (Tw x Rp4)}

Bp

1,094,079.33

Rp./Jam

HSb

1,235,759.33

Rp.

Harga Satuan Batu Pecah Produksi St.Crusher / M3 = {(Qg : Qb) x Fh x Rp1} + Bp PERHITUNGAN Primary Crusher Produksi Primary Crusher + scalping Screen 1 Lolos scalping screen (sreen1) Tidak lolos scalping screen(screen1) ( 100 - LSc 1 ) Asumsi % Biaya proses scalping screen ukuran # 2"=50 mm thdp biaya produksi Biaya Produksi scalping Screen Volume (0 - 50) = ((Prod x LSc 1) x LSc2))/D1

Prod LSc 1 TLSc1 LSc2 BPSc V1

60.00 20.00 80.00 20.00 218,815.87 8.74

Ton/Jam % % % Rp. m3

Secondary Crusher Produksi Secondary Crusher + scalping Screen 2 Asumsi % Biaya proses produksi Batu Pecah thdp BOP S.Crusher 1 set Biaya Produksi = LSc3 : 100 x BP + BPSc : 2 kapasitas yang diproduksi = Prod x TLSc1/100 : D3 Lolos screen2 ukuran ( 0 - 5) Volume ukuran ( 0 - 5) = (CpSC1 x LSc4/100) Lolos screen2 ukuran ( 5 - 9,5) Volume ukuran ( 5 - 9,5) = (CpSC1 x LSc5/100) Lolos screen2 ukuran ( 9.5 - 19,0) Volume ukuran ( 9,5 - 19.0) = (CpSC1 x LSc6/100)

Prod LSc3 Bprod CpSC1 LSc4 V2 LSc5 V3 LSc6 V4

48.00 80.00 984,671.40 38.96 20.00 7.79 30.00 11.69 50.00 19.48

Ton/Jam % Rp. m3 % m3 % m3 % m3

HARGA SATUAN AGREGAT Primary Crusher Harga Satuan Agregat Halus+Kasar untuk Lapis Pondasi / M3 dengan asumsi memerlukan biaya setengah biaya proses scalping screen 1, setengah masuk ke screen1, setengahnya lagi masuk ke Secunder Crusher = ((BPSc : 2) : V1) + Rp2

Hs1

112,518.09

Rp

Secondary Crusher Asumsi %Biaya produksi per fraksi (untuk tiap lengan conveyor 1/3 biaya produksi) Biaya Produksi per Fraksi = Hs 1 : 3 Agregat pecah mesin ( 0 - 5) = PF : V2 + Rp2 Agregat pecah mesin (5 - 9.5) = PF : V3 + Rp2 Agregat pecah mesin (9.5 - 19) = PF : V4 + Rp2

LSc2 PF Hs2 Hs3 Hs4

33.33 411,919.78 152,863.04 135,242.03 121,145.22 409,250.28 126,431.52

% Rp. Rp./M3 Rp./M3 Rp./M3

Agregat pecah kasar

= PF x 2/(V3 + V4) + Rp2

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: AGREGAT KELAS A (kondisi lepas) : PENGADAAN AGREGAT KELAS A : M3

No.

URAIAN

I. 1 2 3 4 5 6 7 8 9 10

II. 1 2

III. 1.

2. 2.a.

KOEFISIEN

SATUAN

KETERANGAN

L t Bip Tk APK PU Bil Fh1 Fh2

8.73 0.15 1.81 7.00 69.85 30.15 1.51 1.05 1.05

KM M jam % % ton/m3

M92 M44

0.7334 0.3166

M3 M3

(E15) V Fb Fa

1.50 0.85 0.83

M3 -

(lepas) kondisi sedang

T1

2.00

menit

jarak 50 meter

Ts1

2.00

menit

Q1

31.75

M3

(E15)

0.0315

jam

(E52) V Fa

25.00 0.83

M3/jam

Q2

20.75 0.0482

M3 jam

Q1 Qt

31.75 222.23

M3/Jam M3

P M

2.00 1.00

memenuhi Spec.

URUTAN KERJA Wheel Loader memuat material bahan campuran dari stockpile ke alat blending Blending equipment melakukan pencampuran (blending) proses pembuatan agregat kelas A

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agregat Pecah Kasar = APK x 1 M3 x Fh1 Aggregat Halus Lapis pond A = PU x 1 M3 x Fh2 ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Waktu pemuatan alat blending

V x Fb x Fa x 60 Ts1 = 1 : Q1

Koefisien Alat / M3 BLENDING EQIPMENT Kapasitas Faktor effesiensi alat Kap. Prod. / jam = Koefisien Alat / M3 3.

KODE

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal lapis agregat padat Berat isi padat Jam kerja efektif per-hari Proporsi Campuran : - Agregat Pecah Kasar - Aggregat Halus Lapis pondasi A Berat Isi Agregat (lepas) Faktor kehilangan - Agregat Pecah Kasar - Aggregat Halus Lapis pondasi A

Kap. Prod. / jam =

2.b.

URAIAN ANALISA HARGA SATUAN

V x Fa = 1 : Q2

TENAGA Produksi menentukan : WHEEL LOADER Produksi Agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / M3

orang orang

: - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

(L01) (L03)

0.0630 0.0315

Jam Jam

padat

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : AGREGAT KELAS A (kondisi lepas) : PENGADAAN AGREGAT KELAS A : M3

NO

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

jam jam

: : :

PERKIRAAN KUANTITAS

0.0630 0.0315

HARGA SATUAN (Rp.)

12,600.00 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1 2

Agregat Pecah Kasar Agg. Halus Lapis Pondasi A

M3 M3

0.7334 0.3166

126,431.52 409,250.28

JUMLAH HARGA BAHAN C. 1. 2. 3

PERALATAN Wheel Loader Blending Equpment Alat Bantu

(E15) (E52)

jam jam Ls

0.0315 0.0482 1.0000

309,926.83 283,680.76 100.00

JUMLAH HARGA PERALATAN D.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

JUMLAH HARGA (Rp. )

793.76 545.22

1,338.99

92,728.04 129,558.41

222,286.44

9,762.24 13,671.36 100.00

23,533.61 247,159.04

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

URAIAN

I 1 2 3 4 5 6 8

9

II 1 2

III. 1.

2. 2.a.

KOEFISIEN

SATUAN

KETERANGAN

l Tk

50.00 7.00

M jam

Bip Tk 20-30 5-10&10-20 St

1.81 7.00 18.00 18.30 63.70

jam % % %

Bil Fh1 Fh2 Fh3

1.51 1.05 1.05 1.05

M93 M92 M16

0.1890 0.1922 0.6689

M3 M3 M3

(E15) V Fb Fa

1.50 0.85 0.83

M3 -

(lepas) kondisi sedang

T1

2.00

menit

jarak 50 meter

Ts1 Q1

2.00 31.75

menit M3

padat

(E15)

0.0315

jam

25.00 0.83 20.75 0.0482

M3/jam

Q1 Qt

31.75 222.23

M3/Jam M3

P M

2.00 1.00

Gradasi harus memenuhi Spesifikasi

ton/m3

Wheel Loader memuat material bahan campuran dari stockpile ke alat blending Blending equipment melakukan pencampuran (blending) Aggregat kasar, aggregat halus dan pasir alam menjadi Aggregat B PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agregat Pecah Kasar = "20-30" x 1 M3 x Fh1 Agregat Lolos # 1 " = "5-10 & 10-20" x 1 M3 x Fh2 - Fraksi lolos Scalping 0 - 37, = St x 1 M3 x Fh3 Screen 0 - 37,5 mm ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Waktu pemuatan alat belending

Koefisien Alat / M3

3.

URAIAN ANALISA HARGA SATUAN

KODE

ASUMSI Bahan Agregat Halus & Kasar diterima di lokasi Base Camp Jarak dari stockpile ke alat blending Jam kerja effektif perhari Kegiatan dilakukan di dalam lokasi Base Camp Berat isi padat Jam kerja efektif per-hari Proporsi Campuran : Agregat Pecah Kasar Agregat Lolos # 1 " - Fraksi lolos Scalping 0 - 37,5 mm Screen 0 - 37,5 mm Berat volume agregat (lepas) Agregat Pecah Kasar Agregat Lolos # 1 " - Fraksi lolos Scalping 0 - 37,5 mm Screen 0 - 37,5 mm URUTAN PEKERJAAN

Kap. Prod. / jam =

2.b.

: AGREGAT KELAS S : PENGADAAN AGREGAT KELAS S : M3

BLENDING EQUIPMENT Kapasitas Faktor effesiensi alat Kap. Prod. / jam = Koefisien Alat / M3

V x Fb x Fa x 60 (Bip/Bil) x Ts1 = 1 : Q1

V x Fa

(E52) V Fa Q2

= 1 : Q2

TENAGA Produksi menentukan : WHEEL LOADER Produksi Agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / M3 : - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

(L01) (L03)

0.0630 0.0315

M3 jam

orang orang Jam Jam

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : AGREGAT KELAS S : PENGADAAN AGREGAT KELAS S : M3

NO

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

jam jam

: : :

PERKIRAAN KUANTITAS

0.0630 0.0315

HARGA SATUAN (Rp.)

12,600.00 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3

Agregat Pecah Kasar Agregat Lolos # 1 " - Fraksi lolos Scalping 0 - 37,5 mm Screen 0 - 37,5 mm

M3 M3 M3

0.1890 0.1922 0.6689

126,431.52 121,145.22 152,863.04

JUMLAH HARGA BAHAN C. 1. 2. 3

PERALATAN Wheel Loader Blending Equpment Alat Bantu

(E15) (E52)

jam jam Ls

0.0315 0.0482 1.0000

309,926.83 283,680.76 100.00

JUMLAH HARGA PERALATAN D.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

JUMLAH HARGA (Rp. )

793.76 545.22

1,338.99

23,895.56 23,278.05 102,242.44

149,416.05

9,762.24 13,671.36 100.00

23,533.61 174,288.65

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: AGREGAT KELAS B (kondisi lepas) : PENGADAAN AGREGAT KELAS B : M3

No.

URAIAN

I 1 2 3 4 5 6 8 9

II

2

2. 2.a.

ASUMSI Bahan Agregat Halus & Kasar diterima di lokasi Base Camp Jarak dari stockpile ke alat blending Jam kerja effektif perhari Kegiatan dilakukan di dalam lokasi Base Camp Berat isi padat Jam kerja efektif per-hari Proporsi Campuran : Fraksi lolos Scalping Screen 0 - 50 mm Fraksi lolos Scalping Screen 0 - 50 mm Berat volume agregat (lepas) - Agregat Pecah Mesin 20 - 30 mm - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fraksi lolos Scalping Screen 0 - 50 mm

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agregat Pecah Kasar = "20-30" x 1 M3 x Fh1 Fraksi lolos Scalping Screen = St x 1 M3 x Fh3 ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Waktu pemuatan alat belending

V x Fb x Fa x 60 (Bip/Bil) x Ts1

Koefisien Alat / M3

= 1 : Q1

BLENDING EQUIPMENT Kapasitas Faktor effesiensi alat Kap. Prod. / jam =

V x Fa

Koefisien Alat / M3 3.

KOEFISIEN

SATUAN

KETERANGAN

l Tk

50.00 7.00

M jam

Bip Tk 20-30 St Bil Fh1 Fh2 Fh3

1.81 7.00 39.60 60.40 1.51 1.05 1.05 1.05

M93 M16

0.4158 0.6342

M3 M3

(E15) V Fb Fa

1.50 0.85 0.83

M3 -

(lepas) kondisi sedang

T1

2.00

menit

jarak 50 meter

Ts1

2.00

menit

Q1

31.75

M3

(E15)

0.0315

jam

(E52) V Fa Q2

25.00 0.83 20.75

M3/jam

0.0482

jam

Q1 Qt

31.75 222.23

M3/Jam M3

P M

2.00 1.00

jam % % ton/m3

Gradasi harus memenuhi Spesifikasi

Wheel Loader memuat material bahan campuran dari stockpile ke alat blending Blending equipment melakukan pencampuran (blending) Aggregat kasar, aggregat halus dan pasir alam menjadi Aggregat B

Kap. Prod. / jam =

2.b.

KODE

URUTAN PEKERJAAN 1

III. 1.

URAIAN ANALISA HARGA SATUAN

= 1 : Q2

TENAGA Produksi menentukan : WHEEL LOADER Produksi Agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / M3

M3

orang orang

: - Pekerja

= (Tk x P) : Qt

(L01)

0.0630

Jam

padat

- Mandor

= (Tk x M) : Qt

(L03)

0.0315

Jam

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : AGREGAT KELAS B (kondisi lepas) : PENGADAAN AGREGAT KELAS B : M3

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

PERKIRAAN KUANTITAS

jam jam

: : :

HARGA SATUAN (Rp.)

0.0630 0.0315

12,600.00 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3

Agregat Pecah Kasar Fraksi lolos Scalping Screen

M93 M16

M3 M3

0.4158 0.6342

126,431.52 126,431.52

JUMLAH HARGA BAHAN C. 1. 2. 3

PERALATAN Wheel Loader Blending Equpment Alat Bantu

(E15) (E52)

jam jam Ls

0.0315 0.0482 1.0000

309,926.83 283,680.76 0.00

JUMLAH HARGA PERALATAN D.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

JUMLAH HARGA (Rp.)

793.76 545.22

1,338.99

52,570.23 80,182.87

132,753.10

9,762.24 13,671.36 0.00

23,433.61 157,525.69

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

URAIAN

I 1 2 3 4 5 6 8

9

II 1 2

III. 1.

2. 2.a.

: AGREGAT KELAS S : PENGADAAN AGREGAT KELAS S : M3

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agregat Pecah Kasar = "20-30" x 1 M3 x Fh1 Agregat Lolos # 1 " = "5-10 & 10-20" x 1 M3 x Fh2 - Fraksi lolos Scalping 0 - 37, = St x 1 M3 x Fh3 Screen 0 - 37,5 mm ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Waktu pemuatan alat belending

Koefisien Alat / M3 2.b.

3.

KODE

ASUMSI Bahan Agregat Halus & Kasar diterima di lokasi Base Camp Jarak dari stockpile ke alat blending Jam kerja effektif perhari Kegiatan dilakukan di dalam lokasi Base Camp Berat isi padat Jam kerja efektif per-hari Proporsi Campuran : Agregat Pecah Kasar Agregat Lolos # 1 " - Fraksi lolos Scalping 0 - 37,5 mm Screen 0 - 37,5 mm Berat volume agregat (lepas) Agregat Pecah Kasar Agregat Lolos # 1 " - Fraksi lolos Scalping 0 - 37,5 mm Screen 0 - 37,5 mm URUTAN PEKERJAAN Wheel Loader memuat material bahan campuran dari stockpile ke alat blending Blending equipment melakukan pencampuran (blending) Aggregat kasar, aggregat halus dan pasir alam menjadi Aggregat B

Kap. Prod. / jam =

BLENDING EQUIPMENT Kapasitas Faktor effesiensi alat Kap. Prod. / jam = Koefisien Alat / M3

URAIAN ANALISA HARGA SATUAN

V x Fb x Fa x 60 (Bip/Bil) x Ts1 = 1 : Q1

V x Fa

= (Tk x P) : Qt = (Tk x M) : Qt

SATUAN

KETERANGAN

l Tk

50.00 7.00

M jam

Bip Tk 20-30 5-10&10-20 St

1.81 7.00 18.00 18.30 63.70

jam % % %

Bil Fh1 Fh2 Fh3

1.51 1.05 1.05 1.05

M93 M92 M16

0.1890 0.1922 0.6689

M3 M3 M3

(E15) V Fb Fa

1.50 0.85 0.83

M3 -

(lepas) kondisi sedang

T1

2.00

menit

jarak 50 meter

Ts1 Q1

2.00 31.75

menit M3

padat

(E15)

0.0315

jam

25.00 0.83 20.75 0.0482

M3/jam

Q1 Qt

31.75 222.23

M3/Jam M3

P M

2.00 1.00

(E52) V Fa Q2

= 1 : Q2

TENAGA Produksi menentukan : WHEEL LOADER Produksi Agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / M3 : - Pekerja - Mandor

KOEFISIEN

(L01) (L03)

0.0630 0.0315

Gradasi harus memenuhi Spesifikasi

ton/m3

M3 jam

orang orang Jam Jam

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : AGREGAT KELAS S : PENGADAAN AGREGAT KELAS S : M3

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

PERKIRAAN KUANTITAS

jam jam

: : :

HARGA SATUAN (Rp.)

0.0630 0.0315

12,600.00 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1. 2. 3

Agregat Pecah Kasar Agregat Lolos # 1 " - Fraksi lolos Scalping 0 - 37,5 mm Screen 0 - 37,5 mm

M3 M3 M3

0.1890 0.1922 0.6689

126,431.52 112,518.09 126,431.52

JUMLAH HARGA BAHAN C. 1. 2. 3

PERALATAN Wheel Loader Blending Equpment Alat Bantu

(E15) (E52)

jam jam Ls

0.0315 0.0482 1.0000

309,926.83 283,680.76 100.00

JUMLAH HARGA PERALATAN D.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

JUMLAH HARGA (Rp.)

793.76 545.22

1,338.99

23,895.56 21,620.35 84,563.72

130,079.63

9,762.24 13,671.36 100.00

23,533.61 154,952.22

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: AGREGAT KELAS A (kondisi lepas) : PENGADAAN AGREGAT KELAS A : M3

No.

URAIAN

I. 1 2 3 4 5 6 7 8 9 10

II. 1 2

III. 1.

2. 2.a.

ASUMSI Menggunakan alat berat (cara mekanik) Lokasi pekerjaan : sepanjang jalan Kondisi existing jalan : sedang Jarak rata-rata Base Camp ke lokasi pekerjaan Tebal lapis agregat padat Berat isi padat Jam kerja efektif per-hari Proporsi Campuran : - Agregat Pecah Kasar - Aggregat Halus Lapis pondasi A Berat Isi Agregat (lepas) Faktor kehilangan - Agregat Pecah Kasar - Aggregat Halus Lapis pondasi A

KOEFISIEN

SATUAN

KETERANGAN

L t Bip Tk APK PU Bil Fh1 Fh2

70.00 0.15 1.81 7.00 69.85 30.15 1.51 1.05 1.05

KM M jam % % ton/m3

M92 M44

0.7334 0.3166

M3 M3

(E15) V Fb Fa

1.50 0.85 0.83

M3 -

(lepas) kondisi sedang

T1

2.00

menit

jarak 50 meter

Ts1

2.00

menit

Q1

31.75

M3

(E15)

0.0315

jam

(E52) V Fa

25.00 0.83

M3/jam

Q2

20.75

M3

0.0482

jam

Q1 Qt

31.75 222.23

M3/Jam M3

P M

2.00 1.00

memenuhi Spec.

PEMAKAIAN BAHAN, ALAT DAN TENAGA BAHAN Agregat Pecah Kasar = APK x 1 M3 x Fh1 Aggregat Halus Lapis pond A = PU x 1 M3 x Fh2 ALAT WHEEL LOADER Kapasitas bucket Faktor bucket Faktor Efisiensi alat Waktu Siklus : - Waktu pemuatan alat blending

V x Fb x Fa x 60 Ts1

Koefisien Alat / M3

= 1 : Q1

BLENDING EQIPMENT Kapasitas Faktor effesiensi alat Kap. Prod. / jam =

V x Fa

Koefisien Alat / M3 3.

KODE

URUTAN KERJA Wheel Loader memuat material bahan campuran dari stockpile ke alat blending Blending equipment melakukan pencampuran (blending) proses pembuatan agregat kelas A

Kap. Prod. / jam =

2.b.

URAIAN ANALISA HARGA SATUAN

= 1 : Q2

TENAGA Produksi menentukan : WHEEL LOADER Produksi Agregat / hari = Tk x Q1 Kebutuhan tenaga : - Pekerja - Mandor Koefisien tenaga / M3

orang orang

: - Pekerja - Mandor

= (Tk x P) : Qt = (Tk x M) : Qt

(L01) (L03)

0.0630 0.0315

Jam Jam

padat

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : AGREGAT KELAS A (kondisi lepas) : PENGADAAN AGREGAT KELAS A : M3

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

PERKIRAAN KUANTITAS

jam jam

: : :

HARGA SATUAN (Rp.)

0.0630 0.0315

12,600.00 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1 2

Agregat Pecah Kasar Agg. Halus Lapis Pondasi A

M3 M3

0.7334 0.3166

126,431.52 126,431.52

JUMLAH HARGA BAHAN C. 1. 2. 3

PERALATAN Wheel Loader Blending Equpment Alat Bantu

(E15) (E52)

jam jam Ls

0.0315 0.0482 1.0000

309,926.83 283,680.76 100.00

JUMLAH HARGA PERALATAN D.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

JUMLAH HARGA (Rp.)

793.76 545.22

1,338.99

92,728.04 40,025.06

132,753.10

9,762.24 13,671.36 100.00

23,533.61 157,625.69

SPESIFIKASI TEKNIS Satker / PPK No. Paket Kontrak Nama Paket Prov/Kab/Kodya

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

SPESIFIKASI TEKNIS SAMA DENGAN SPESIFIKASI TEKNIS YANG TERDAPAT PADA DOKUMEN LELANG

Padang, 11 Februari 2019 Pelaksana, PT. CITRA PERMATA SULUNG

FARDI MUABAROK Direktur Utama

SIFIKASI TEKNIS

MA DENGAN SPESIFIKASI TEKNIS PADA DOKUMEN LELANG

Padang, 11 Februari 2019 PT. CITRA PERMATA SULUNG

FARDI MUABAROK Direktur Utama

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat

5

KODE

Pw Cp A W B

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

KOEF.

SATUAN

ASPHALT MIXING PLANT 294.0 HP 60.0 T/Jam 10.0 Tahun 1,500.0 Jam 3,000,000,000.0 Rupiah

Kapastas tangki aspal

Ca

30,000.00

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

300,000,000

2.

Faktor Angsuran Modal

i x (1 + i)^A (1 + i)^A - 1

D

0.16275

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

(B-C)xD W

E

292,941.71

Rupiah

F

4,000.00

Rupiah

G

296,941.71

Rupiah

= 12 ltr x Ms

H1 H2

441,000.00 5,040,000.00

Rupiah Rupiah

=1/1000 *Ca*Ms

H3

300,000.00

I

255,780.00

J

175,000

K

350,000.00

Rupiah

L M

15,166.67 39,071.43

Rupiah Rupiah

P

6,616,018.10

Rupiah

T

6,912,959.81

Rupiah

=

b. Asuransi, dll =

Biaya Pasti per Jam C. 1.

0.002 x B W =

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Bahan Bakar Pemanasan Material dan aspal (Oil Heater) Bahan Bakar Pemanas Aspal

2.

Pelumas

3.

Biaya bengkel

4.

Biaya perbaikan 5 6

(E+F)

= (2.5%-3%) x Pw x Mp

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 3 Orang / Jam ) x U2 =

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan Bahan bakar Batubara

7 8

(H+I+J+K+L+M)

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

Err:509

URAIAN ANALISA ALAT

liter

Rupiah -

Rupiah

% / Tahun Rp./Jam Rp./Jam Rp./liter Rp./liter Rp./liter

Rp/kg

No.

A. 1. 2. 3. 4.

URAIAN

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

KODE

KOEF.

SATUAN

ASPHALT FINISHER 72.4 10.0 6.0 1,400.0 805,200,000

HP Ton Tahun Jam Rupiah

C

80,520,000

Rupiah

i x (1 + i)^A (1 + i)^A - 1

D

0.22961

(B-C)xD W

E

118,851.34

Rupiah

F

1,150.29

Rupiah

G

120,001.63

Rupiah

Pw Cp A W B

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

5.

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

=

b. Asuransi, dll =

Biaya Pasti per Jam

0.002 x B W =

(E+F)

-

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

108,600.00

Rupiah

2.

Pelumas

I

62,988.00

Rupiah

J

35,946

K

100,650.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

336,374.90

Rupiah

S

456,376.53

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

A.

URAIAN

URAIAN PERALATAN

KODE

KOEF.

SATUAN

1. 2. 3. 4.

Jenis Peralatan Tenaga Kapasitas Alat Baru

Pw Cp A W B

ASPHALT SPRAYER 4.0 850.0 5.0 2,000.0 125,000,000

Kapastas tangki aspal

Ca

850

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

C

12,500,000

2.

Faktor Angsuran Modal

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

(B-C)xD W

E

14,838.61

Rupiah

F

125.00

Rupiah

G

14,963.61

Rupiah

H H3

4,800.00 8,500.00

Rupiah Rupiah

I

2,900.00

Rupiah

J

5,469

Rupiah

K

7,812.50

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

57,671.73

Rupiah

S

72,635.33

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

5

:

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

0.002 x B W =

(E+F)

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms Bahan Bakar Pemanas Aspal

2.

Pelumas

= 1/1000 *Ca*Ms

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

HP Liter Tahun Jam Rupiah

Liter

Rupiah -

URAIAN ANALISA ALAT

No.

A. 1. 2. 3. 4.

URAIAN

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

a. Umur Ekonomis

KODE

Pw Cp A

KOEF.

BULLDOZER 100-150 HP 155.0 5.0

SATUAN

HP Tahun

b. Jam Kerja Dalam 1 Tahun c. Harga Alat

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

=

b. Asuransi, dll =

Biaya Pasti per Jam

W B

2,000.0 1,800,000,000

Jam Rupiah

C

180,000,000

Rupiah

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

213,675.96

Rupiah

F

1,800.00

Rupiah

G

215,475.96

Rupiah

0.002 x B W =

(E+F)

-

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

186,000.00

Rupiah

2.

Pelumas

I

112,375.00

Rupiah

J

78,750

K

112,500.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

517,815.48

Rupiah

S

733,291.44

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

A. 1. 2. 3. 4.

URAIAN

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

KODE

Pw Cp A W B

KOEF.

SATUAN

COMPRESSOR 4000-6500 L\M 60.0 HP 5,000.0 CPM/(L/m) 5.0 Tahun 2,000.0 Jam 145,000,000 Rupiah

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

=

b. Asuransi, dll =

C

14,500,000

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

17,212.79

Rupiah

F

145.00

Rupiah

G

17,357.79

Rupiah

0.002 x B W

Biaya Pasti per Jam

=

(E+F)

Rupiah -

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

72,000.00

Rupiah

2.

Pelumas

I

43,500.00

Rupiah

J

6,344

K

9,062.50

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

159,096.73

Rupiah

S

176,454.51

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :

KODE

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

i x (1 + i)^A (1 + i)^A - 1

Pw Cp A W B

KOEF.

SATUAN

CONCRETE MIXER 0.3-0.6 M3 20.0 HP 500.0 Liter 2.0 Tahun 1,500.0 Jam 17,550,000 Rupiah

C

1,755,000

D

0.57619

Rupiah -

a. Biaya Pengembalian Modal =

(B-C)xD W

b. Asuransi, dll =

0.002 x B W

Biaya Pasti per Jam

=

(E+F)

E

6,067.29

Rupiah

F

23.40

Rupiah

G

6,090.69

Rupiah

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

30,000.00

Rupiah

2.

Pelumas

I

17,400.00

Rupiah

J

1,024

Rupiah

K

2,047.50

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

78,661.73

Rupiah

S

84,752.41

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

A. 1. 2. 3. 4.

URAIAN

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

KODE

KOEF.

SATUAN

CRANE 10-15 TON 138.0 15.0 5.0 2,000.0 325,000,000

HP Ton Tahun Jam Rupiah

C

32,500,000

Rupiah

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

38,580.38

Rupiah

F

325.00

Rupiah

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

5.

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

b. Asuransi, dll =

=

0.002 x B W

-

Biaya Pasti per Jam

=

(E+F)

G

38,905.38

Rupiah

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

165,600.00

Rupiah

2.

Pelumas

I

100,050.00

Rupiah

J

14,219

Rupiah

K

20,312.50

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

328,371.73

Rupiah

S

367,277.11

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

SATUAN

DUMP TRUCK 3.5 TON 100.0 3.5 5.0 2,000.0 250,000,000

HP Ton Tahun Jam Rupiah

C

25,000,000

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

29,677.22

Rupiah

F

250.00

Rupiah

G

29,927.22

Rupiah

H

120,000.00

Rupiah

0.002 x B W =

Pw Cp A W B

KOEF.

(E+F)

Rupiah -

2.

Pelumas

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B W

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator

(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir / Mekanik Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

I

72,500.00

Rupiah

J

10,938

K

15,625.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

247,252.98

Rupiah

S

277,180.19

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

=

KOEF.

SATUAN

DUMP TRUCK 10 TON 190.0 10.0 5.0 2,000.0 500,000,000

HP Ton Tahun Jam Rupiah

C

50,000,000

Rupiah

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

59,354.43

Rupiah

F

500.00

Rupiah

G

59,854.43

Rupiah

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

0.002 x B W =

(E+F)

Pw Cp A W B

-

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

228,000.00

Rupiah

2.

Pelumas

I

137,750.00

Rupiah

J

21,875

Rupiah

K

31,250.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B

perbaikan 4. 5.

=

Operator Pembantu Operator

W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir / Mekanik Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

L M

15,166.67 13,023.81

Rupiah Rupiah

P

447,065.48

Rupiah

S

506,919.91

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

Pw Cp A W B

KOEF.

SATUAN

EXCAVATOR 80-140 HP 133.0 0.93 5.0 2,000.0 1,050,000,000

HP M3 Tahun Jam Rupiah

C

105,000,000

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

124,644.31

Rupiah

F

1,050.00

Rupiah

G

125,694.31

Rupiah

0.002 x B W =

(E+F)

Rupiah -

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

159,600.00

Rupiah

2.

Pelumas

I

96,425.00

Rupiah

J

45,938

Rupiah

K

65,625.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

395,777.98

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

S

521,472.29

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

Pw Cp A W B

KOEF.

SATUAN

FLAT BED TRUCK 3-4 M3 190.0 10.0 5.0 2,000.0 165,000,000

HP M3 Tahun Jam Rupiah

C

16,500,000

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

19,586.96

Rupiah

F

165.00

Rupiah

G

19,751.96

Rupiah

0.002 x B W =

(E+F)

Rupiah -

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

228,000.00

Rupiah

2.

Pelumas

I

137,750.00

Rupiah

J

7,219

Rupiah

K

10,312.50

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

411,471.73

Rupiah Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

S

431,223.69

E. 1.

LAIN - LAIN Tingkat Suku Bunga

i

10.00

% / Tahun

2. 3. 4. 5. 6. 7.

Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

U1 U2 Mb Ms Mp

15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

=

KOEF.

SATUAN

GENERATOR SET 180.0 135.0 5.0 2,000.0 300,000,000

HP KVA Tahun Jam Rupiah

C

30,000,000

Rupiah

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

35,612.66

Rupiah

F

300.00

Rupiah

G

35,912.66

Rupiah

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

0.002 x B W =

(E+F)

Pw Cp A W B

-

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

216,000.00

Rupiah

2.

Pelumas

I

130,500.00

Rupiah

J

13,125

Rupiah

K

18,750.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

406,565.48

Rupiah

S

442,478.14

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi

(H+I+K+L+M)

Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

Pw Cp A W B

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

KOEF.

SATUAN

MOTOR GRADER >100 HP 135.0 HP 10,800.0 5.0 Tahun 2,000.0 Jam 676,000,000 Rupiah

C

67,600,000

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

80,247.19

Rupiah

F

676.00

Rupiah

G

80,923.19

Rupiah

0.002 x B W =

(E+F)

Rupiah -

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

162,000.00

Rupiah

2.

Pelumas

I

97,875.00

Rupiah

J

29,575

Rupiah

K

42,250.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

359,890.48

Rupiah

S

440,813.67

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

(H+I+K+L+M)

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

Pw Cp A W B

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

KOEF.

SATUAN

TRACK LOADER 75-100 HP 70.0 HP 0.8 M3 5.0 Tahun 2,000.0 Jam 498,960,000 Rupiah

C

49,896,000

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

59,230.98

Rupiah

F

498.96

Rupiah

G

59,729.94

Rupiah

0.002 x B W =

(E+F)

Rupiah -

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

84,000.00

Rupiah

2.

Pelumas

I

50,750.00

Rupiah

J

21,830

Rupiah

K

31,185.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

215,954.98

Rupiah

S

275,684.91

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

A.

URAIAN

URAIAN PERALATAN

KODE

KOEF.

SATUAN

1. 2. 3. 4.

Jenis Peralatan Tenaga Kapasitas Alat Baru

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

:

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

Pw Cp A W B

WHEEL LOADER 1.0-1.6 M3 96.0 HP 1.5 M3 5.0 Tahun 2,000.0 Jam 429,000,000 Rupiah

C

42,900,000

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

50,926.10

Rupiah

F

429.00

Rupiah

G

51,355.10

Rupiah

0.002 x B W =

(E+F)

Rupiah -

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

115,200.00

Rupiah

2.

Pelumas

I

69,600.00

Rupiah

J

18,769

Rupiah

K

26,812.50

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

258,571.73

Rupiah

S

309,926.83

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

A. 1. 2. 3. 4.

URAIAN

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

KODE

Pw Cp A W B

KOEF.

SATUAN

THREE WHEEL ROLLER 6-8 T 55.0 HP 8.0 Ton 5.0 Tahun 2,000.0 Jam 350,000,000 Rupiah

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

=

b. Asuransi, dll =

Biaya Pasti per Jam

C

35,000,000

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

41,548.10

Rupiah

F

350.00

Rupiah

G

41,898.10

Rupiah

0.002 x B W =

(E+F)

Rupiah -

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

66,000.00

Rupiah

2.

Pelumas

I

39,875.00

Rupiah

J

15,313

Rupiah

K

21,875.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

171,252.98

Rupiah

S

213,151.08

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

KODE

Pw Cp A W B

C

KOEF.

TANDEM ROLLER 6-8 T. 82.0 8.1 5.0 2,000.0 450,000,000

45,000,000

SATUAN

HP Ton Tahun Jam Rupiah

Rupiah

2.

Faktor Angsuran Modal

=

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

b. Asuransi, dll =

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

53,418.99

Rupiah

F

450.00

Rupiah

G

53,868.99

Rupiah

0.002 x B W

Biaya Pasti per Jam

=

(E+F)

-

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

98,400.00

Rupiah

2.

Pelumas

I

59,450.00

Rupiah

J

19,688

Rupiah

K

28,125.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

233,852.98

Rupiah

S

287,721.97

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

KODE

SATUAN

TIRE ROLLER 8-10 T. 100.5 9.0 5.0 2,000.0 900,000,000

HP Ton Tahun Jam Rupiah

C

90,000,000

Rupiah

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

106,837.98

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

KOEF.

Pw Cp A W B

-

Rupiah

b. Asuransi, dll =

0.002 x B W

Biaya Pasti per Jam

=

(E+F)

F

900.00

Rupiah

G

107,737.98

Rupiah

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

120,600.00

Rupiah

2.

Pelumas

I

72,862.50

Rupiah

J

39,375

Rupiah

K

56,250.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

317,277.98

Rupiah

S

425,015.96

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

C

SATUAN

VIBRATORY ROLLER 5-8 T. 82.0 HP 7.050 Ton 5.0 Tahun 2,000.0 Jam 985,000,000 Rupiah

BIAYA PASTI PER JAM KERJA 98,500,000 Rupiah

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

116,928.23

Rupiah

F

985.00

Rupiah

G

117,913.23

Rupiah

0.002 x B W =

Pw Cp A W B

KOEF.

(E+F)

-

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

98,400.00

Rupiah

2.

Pelumas

I

59,450.00

Rupiah

J

43,094

Rupiah

K

61,562.50

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

290,696.73

Rupiah

S

408,609.96

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B W

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator

(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

SATUAN

CONCRETE VIBRATOR 5.5 25.0 4.0 1,000.0 14,784,000

HP Tahun Jam Rupiah

C

1,478,400

i x (1 + i)^A (1 + i)^A - 1

D

0.31547

-

(B-C)xD W

E

4,197.53

Rupiah

F

29.57

Rupiah

G

4,227.10

Rupiah

0.002 x B W =

Pw Cp A W B

KOEF.

(E+F)

Rupiah

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

8,250.00

Rupiah

2.

Pelumas

I

4,785.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B W

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator

(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

J

924

Rupiah

K

2,587.20

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

44,736.68

Rupiah

S

48,963.77

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

=

KOEF.

SATUAN

STONE CRUSHER 220.0 60.0 5.0 2,000.0 1,500,000,000

HP T/Jam Tahun Jam Rupiah

C

150,000,000

Rupiah

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

178,063.30

Rupiah

F

1,500.00

Rupiah

G

179,563.30

Rupiah

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

0.002 x B W =

(E+F)

Pw Cp A W B

-

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

264,000.00

Rupiah

2.

Pelumas

I

159,500.00

Rupiah

J

65,625

Rupiah

K

93,750.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W

4. 5.

Operator Pembantu Operator

= ( 1 Orang / Jam ) x U1 = ( 2 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

L M

15,166.67 26,047.62

Rupiah Rupiah

P

624,089.29

Rupiah

S

803,652.59

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

Pw Cp A W B

KOEF.

SATUAN

WATER PUMP 70-100 mm 6.0 HP 3.0 Tahun 2,000.0 Jam 19,800,000 Rupiah

C

1,980,000

i x (1 + i)^A (1 + i)^A - 1

D

0.40211

-

(B-C)xD W

E

3,582.84

Rupiah

F

19.80

Rupiah

G

3,602.64

Rupiah

0.002 x B W =

(E+F)

Rupiah

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

7,200.00

Rupiah

2.

Pelumas

I

4,350.00

Rupiah

J

866

Rupiah

K

1,237.50

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

41,844.23

Rupiah

S

45,446.87

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

D.

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

(H+I+K+L+M)

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

Pw Cp A W B

KOEF.

SATUAN

WATER TANKER 3000-4500 L. 100.0 HP 4,000.0 Liter 5.0 Tahun 2,000.0 Jam 165,000,000 Rupiah

C

16,500,000

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

19,586.96

Rupiah

F

165.00

Rupiah

G

19,751.96

Rupiah

0.002 x B W =

(E+F)

Rupiah -

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

120,000.00

Rupiah

2.

Pelumas

I

72,500.00

Rupiah

J

7,219

Rupiah

K

10,312.50

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

238,221.73

Rupiah

S

257,973.69

Rupiah

i U1 U2

10.00 15,166.67 13,023.81

% / Tahun Rp./Jam Rp./Jam

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir

(H+I+K+L+M)

4. 5. 6. 7.

Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Mb Ms Mp

8,500.00 10,000.00 29,000.00

Liter Liter Liter

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

Pw Cp A W B

KOEF.

SATUAN

PEDESTRIAN ROLLER 8.8 835.000 3.0 2,000.0 150,000,000

HP Ton Tahun Jam Rupiah

C

15,000,000

i x (1 + i)^A (1 + i)^A - 1

D

0.40211

(B-C)xD W

E

27,142.75

Rupiah

F

150.00

Rupiah

G

27,292.75

Rupiah

0.002 x B W =

(E+F)

Rupiah -

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

10,560.00

Rupiah

2.

Pelumas

I

6,380.00

Rupiah

J

6,563

Rupiah

K

9,375.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

61,067.98

Rupiah

S

88,360.73

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

(H+I+K+L+M)

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

KOEF.

SATUAN

TAMPER Pw Cp A W B

4.7 121.000 4.0 1,000.0 29,000,000

HP Ton Tahun Jam Rupiah

C

2,900,000

Rupiah

i x (1 + i)^A (1 + i)^A - 1

D

0.31547

-

(B-C)xD W

E

8,233.79

Rupiah

F

58.00

Rupiah

G

8,291.79

Rupiah

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

0.002 x B W =

(E+F)

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

7,050.00

Rupiah

2.

Pelumas

I

4,089.00

Rupiah

J

1,813

Rupiah

K

5,075.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

46,216.98

Rupiah

S

54,508.76

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

(H+I+K+L+M)

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

=

KOEF.

SATUAN

JACK HAMMER 0.0 1,330.000 5.0 2,000.0 35,000,000

HP Tahun Jam Rupiah

C

3,500,000

Rupiah

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

-

(B-C)xD W

E

4,154.81

Rupiah

F

35.00

Rupiah

G

4,189.81

Rupiah

Pw Cp A W B

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

0.002 x B W =

(E+F)

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

0.00

Rupiah

2.

Pelumas

I

0.00

Rupiah

J

1,531

Rupiah

K

2,187.50

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

31,909.23

Rupiah

S

36,099.04

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

A. 1.

URAIAN

URAIAN PERALATAN Jenis Peralatan

KODE

KOEF.

FULVI MIXER

SATUAN

2. 3. 4.

Tenaga Kapasitas Alat Baru

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

:

345.0 2,005 4.0 1,000.0 159,500,000

HP Tahun Jam Rupiah

C

15,950,000

Rupiah

i x (1 + i)^A (1 + i)^A - 1

D

0.31547

(B-C)xD W

E

45,285.83

Rupiah

F

319.00

Rupiah

G

45,604.83

Rupiah

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

Pw Cp A W B

0.002 x B W =

(E+F)

-

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

517,500.00

Rupiah

2.

Pelumas

I

300,150.00

Rupiah

J

9,969

Rupiah

K

27,912.50

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

883,721.73

Rupiah

S

929,326.56

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

A. 1. 2. 3. 4.

URAIAN

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

KODE

Pw Cp A W B

KOEF.

CONCRETE PUMP 100.0 8.00 6.0 2,000.0 750,000,000

SATUAN

HP M3 Tahun Jam Rupiah

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

=

b. Asuransi, dll =

Biaya Pasti per Jam

C

75,000,000

i x (1 + i)^A (1 + i)^A - 1

D

0.22961

(B-C)xD W

E

77,492.49

Rupiah

F

750.00

Rupiah

G

78,242.49

Rupiah

0.002 x B W =

(E+F)

Rupiah -

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

120,000.00

Rupiah

2.

Pelumas

I

72,500.00

Rupiah

J

32,813

Rupiah

K

46,875.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

300,377.98

Rupiah

S

378,620.47

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

KODE

Pw Cp A W B

C

KOEF.

SATUAN

TRAILER 20 TON 175.0 20.00 6.0 2,000.0 372,900,000

HP Ton Tahun Jam Rupiah

37,290,000

Rupiah

2.

Faktor Angsuran Modal

=

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

b. Asuransi, dll =

i x (1 + i)^A (1 + i)^A - 1

D

0.22961

(B-C)xD W

E

38,529.27

Rupiah

F

372.90

Rupiah

G

38,902.17

Rupiah

0.002 x B W

Biaya Pasti per Jam

=

(E+F)

-

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

210,000.00

Rupiah

2.

Pelumas

I

126,875.00

Rupiah

J

16,314

Rupiah

K

23,306.25

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

404,686.10

Rupiah

S

443,588.27

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

KODE

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

Pw Cp A W B

KOEF.

SATUAN

PILE DRIVER + HAMMER 25.0 2.50 5.0 2,000.0 1,750,000,000

C

175,000,000

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

(B-C)xD W

E

207,740.52

HP Ton Tahun Jam Rupiah

Rupiah -

Rupiah

b. Asuransi, dll =

0.002 x B W

Biaya Pasti per Jam

=

(E+F)

F

1,750.00

Rupiah

G

209,490.52

Rupiah

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

30,000.00

Rupiah

2.

Pelumas

I

18,125.00

Rupiah

J

76,563

Rupiah

K

109,375.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

262,252.98

Rupiah

S

471,743.49

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

=

C.

BIAYA OPERASI PER JAM KERJA

SATUAN

CRANE ON TRACK 35 TON 125.0 HP 35.00 Ton 6.0 Tahun 2,000.0 Jam 1,500,000,000 Rupiah

C

150,000,000

i x (1 + i)^A (1 + i)^A - 1

D

0.22961

(B-C)xD W

E

154,984.98

Rupiah

F

1,500.00

Rupiah

G

156,484.98

Rupiah

0.002 x B W =

KOEF.

Pw Cp A W B

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

(E+F)

Rupiah -

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

150,000.00

Rupiah

2.

Pelumas

I

90,625.00

Rupiah

J

65,625

Rupiah

K

93,750.00

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

428,190.48

Rupiah

S

584,675.46

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B W

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator

(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

=

KOEF.

SATUAN

WELDING SET 40.0 250.00 5.0 2,000.0 17,500,000

HP Amp Tahun Jam Rupiah

C

1,750,000

Rupiah

i x (1 + i)^A (1 + i)^A - 1

D

0.26380

-

(B-C)xD W

E

2,077.41

Rupiah

F

17.50

Rupiah

G

2,094.91

Rupiah

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

0.002 x B W =

(E+F)

Pw Cp A W B

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

48,000.00

Rupiah

2.

Pelumas

I

29,000.00

Rupiah

J

766

Rupiah

Biaya bengkel

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B

W 3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator

(12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

K

1,093.75

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

107,049.85

Rupiah

S

109,144.76

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

=

KOEF.

SATUAN

BORE PILE MACHINE 150.0 2,000.00 6.0 2,000.0 2,250,000,000

HP Meter Tahun Jam Rupiah

C

225,000,000

Rupiah

i x (1 + i)^A (1 + i)^A - 1

D

0.22961

(B-C)xD W

E

232,477.47

Rupiah

F

2,250.00

Rupiah

G

234,727.47

Rupiah

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

0.002 x B W =

(E+F)

Pw Cp A W B

-

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

180,000.00

Rupiah

2.

Pelumas

I

108,750.00

Rupiah

J

98,438

Rupiah

K

140,625.00

Rupiah

L

15,166.67

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4.

Operator

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1

5.

Pembantu Operator

= ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

M

13,023.81

Rupiah

P

556,002.98

Rupiah

S

790,730.45

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

KODE

Pw Cp A W B

KOEF.

SATUAN

ASPHALT LIQUID MIXER 5.0 1,000.0 4.0 2,000.0 15,000,000

HP Liter Tahun Jam Rupiah

C

1,500,000

i x (1 + i)^A (1 + i)^A - 1

D

0.31547

-

(B-C)xD W

E

2,129.43

Rupiah

F

15.00

Rupiah

G

2,144.43

Rupiah

0.002 x B W =

(E+F)

Rupiah

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

6,000.00

Rupiah

2.

Pelumas

I

3,625.00

Rupiah

J

656

Rupiah

K

937.50

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

39,409.23

Rupiah

S

41,553.65

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

D.

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

(H+I+K+L+M)

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

No.

URAIAN

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru :

B. 1.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

KODE

a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

=

b. Asuransi, dll =

Biaya Pasti per Jam

i U1 U2 Mb Ms Mp

Pw Cp A W B

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

KOEF.

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

ASPHALT LIQUID MIXER 40.0 20,000.0 4.0 2,000.0 15,000,000

HP Liter Tahun Jam Rupiah

C

1,500,000

i x (1 + i)^A (1 + i)^A - 1

D

0.31547

-

(B-C)xD W

E

2,129.43

Rupiah

F

15.00

Rupiah

G

2,144.43

Rupiah

0.002 x B W =

(E+F)

Rupiah

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

H

48,000.00

Rupiah

2.

Pelumas

I

29,000.00

Rupiah

J

656

Rupiah

K

937.50

Rupiah

L M

15,166.67 13,023.81

Rupiah Rupiah

P

106,784.23

Rupiah

S

108,928.65

Rupiah

i U1 U2 Mb Ms Mp

10.00 15,166.67 13,023.81 8,500.00 10,000.00 29,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan perbaikan =

4. 5.

Operator Pembantu Operator Biaya Operasi per Jam

(6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 =

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

(H+I+K+L+M)

7.

PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

RAIAN ANALISA ALAT

RAIAN ANALISA ALAT

KET.

E01

Khusus AMP

KET.

E02

RAIAN ANALISA ALAT

KET.

E03

RAIAN ANALISA ALAT

KET.

E04

RAIAN ANALISA ALAT

KET.

E05

RAIAN ANALISA ALAT

KET.

E06

RAIAN ANALISA ALAT

KET.

E07

RAIAN ANALISA ALAT

KET.

E08

RAIAN ANALISA ALAT

KET.

E09

RAIAN ANALISA ALAT

KET.

E10

RAIAN ANALISA ALAT

KET.

E11

RAIAN ANALISA ALAT

KET.

E12

RAIAN ANALISA ALAT

RAIAN ANALISA ALAT

KET.

E13

KET.

E14

RAIAN ANALISA ALAT

KET.

E15

RAIAN ANALISA ALAT

KET.

E16

RAIAN ANALISA ALAT

KET.

E17

RAIAN ANALISA ALAT

KET.

E18

RAIAN ANALISA ALAT

KET.

E19

RAIAN ANALISA ALAT

KET.

E20

RAIAN ANALISA ALAT

KET.

E21

RAIAN ANALISA ALAT

KET.

E22

RAIAN ANALISA ALAT

KET.

E23

RAIAN ANALISA ALAT

KET.

E24

RAIAN ANALISA ALAT

RAIAN ANALISA ALAT

KET.

E25

KET.

E26

RAIAN ANALISA ALAT

KET.

E27

RAIAN ANALISA ALAT

KET.

E28

RAIAN ANALISA ALAT

KET.

E29

RAIAN ANALISA ALAT

KET.

E30

RAIAN ANALISA ALAT

KET.

E31

RAIAN ANALISA ALAT

KET.

E32

RAIAN ANALISA ALAT

KET.

E33

RAIAN ANALISA ALAT

KET.

E34

KET.

E34a Kapasitas 20.000 Khusus digunakan untuk Asphalt Modifikasi

TENAGA ALAT

No.

JENIS PERALATAN

KODE ALAT

1

2

2a

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30 31. 32. 33. 34.

ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3.5 TON DUMP TRUCK 10 TON EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER KETERANGAN :

E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 1 2 3 4 5 6 7 8

KAPASITAS ALAT

HARGA ALAT

ALAT YANG DIPAK JAM UMUR

KERJA

ALAT

1 TAHUN

(HP)

-

(Tahun)

(Tahun)

(Jam)

HP 3

Cp 4

B 5

A 6

W 7

294.0 60.0 T/Jam 3,000,000,000 10.0 1,500.0 72.4 10.0 Ton 805,200,000 6.0 1,400.0 4.0 850.0 Liter 125,000,000 5.0 2,000.0 155.0 1,800,000,000 5.0 2,000.0 60.0 5,000.0 CPM/(L/m) 145,000,000 5.0 2,000.0 20.0 500.0 Liter 17,550,000 2.0 1,500.0 138.0 15.0 Ton 325,000,000 5.0 2,000.0 100.0 3.5 Ton 250,000,000 5.0 2,000.0 190.0 10.0 Ton 500,000,000 5.0 2,000.0 133.0 0.9 M3 1,050,000,000 5.0 2,000.0 190.0 10.0 ton 165,000,000 5.0 2,000.0 180.0 135.0 KVA 300,000,000 5.0 2,000.0 135.0 10,800.0 676,000,000 5.0 2,000.0 70.0 0.8 M3 498,960,000 5.0 2,000.0 96.0 1.5 M3 429,000,000 5.0 2,000.0 55.0 8.0 Ton 350,000,000 5.0 2,000.0 82.0 8.1 Ton 450,000,000 5.0 2,000.0 100.5 9.0 Ton 900,000,000 5.0 2,000.0 82.0 7.1 Ton 985,000,000 5.0 2,000.0 5.5 25.0 14,784,000 4.0 1,000.0 220.0 60.0 T/Jam 1,500,000,000 5.0 2,000.0 6.0 19,800,000 3.0 2,000.0 100.0 4,000.0 Liter 165,000,000 5.0 2,000.0 8.8 835.0 Ton 150,000,000 3.0 2,000.0 4.7 121.0 Ton 29,000,000 4.0 1,000.0 0.0 1,330.0 35,000,000 5.0 2,000.0 345.0 2,005.0 159,500,000 4.0 1,000.0 100.0 8.00 M3 750,000,000 6.0 2,000.0 175.0 20.00 Ton 372,900,000 6.0 2,000.0 25.0 2.50 Ton 1,750,000,000 5.0 2,000.0 125.0 35.00 Ton 1,500,000,000 6.0 2,000.0 40.0 250.00 Amp 17,500,000 5.0 2,000.0 150.0 2,000.0 Meter 2,250,000,000 6.0 2,000.0 5.0 1,000.0 Liter 15,000,000 4.0 2,000.0 Tingkat Suku Bunga = Upah Operator / Sopir / Mekanik = Upah Pembantu Operator/Sopir/Mekanik = Harga Bahan Bakar Bensin = Harga Bahan Bakar Solar = Minyak Pelumas = Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (

TENAGA ALAT

KAPASITAS ALAT

HARGA ALAT

ALAT YANG DIPAK JAM UMUR KERJA ALAT

1 TAHUN

No.

JENIS PERALATAN

KODE ALAT

1

2

2a

35. 36. 37. 38. 39. 40. 41. 42. 43. 44. 45. 46. 47. 48. 49. 50. 51. 52. 53. 54. 55. 56. 57. 58. 59. 60. 61. 62. 63. 64. 65. 66. 67. 68.

TRONTON COLD MILLING MACHINE ROCK DRILL BREAKER COLD RECYCLER HOT RECYCLER AGGREGAT (CHIP) SPREADER ASPHALT DISTRIBUTOR SLIP FORM PAVER CONCRETE PAN MIXER CONCRETE BREAKER ASPAHLT TANKER CEMENT TANKER CONDRETE MIXER (350) VIBRATING RAMMER TRUK MIXER (AGITATOR) BORE PILE MACHINE CRANE ON TRACK 75-100 TON BLENDING EQUIPMENT ASPHALT LIQUID MIXER BAR BENDER BAR CUTTER BREAKER GROUTING PUMP JACK HIDROLIC MESIN LAS PILE DRIVER LEADER, 75 kw PILE HAMMER PILE HAMMER, 2,5 Ton STRESSING JACK WELDING MACHINE, 300 A Chain Saw

KETERANGAN :

E35 E37 E36 E38 E39 E40 E41 E42 E43 E44 E45 E46 E47 E48 E49 E50 E51 E52 E34a E53 E54 E55 E56 E57 E58 E59 E60 E61 E62 E63 E64

1 2 3 4 5 6 7 8 9

(HP)

-

(Tahun)

(Tahun)

(Jam)

HP 3

Cp 4

B 5

A 6

W 7

150.0 248.0 3.0 900.0 400.0 115.0 115.0 105.0 134.0 290.0 190.0 190.0 20.0 4.2 220.0 125.0 200.0 50.0 40.0 3.0 3.0 80.0 100.0 3.0 3.0 70.0 10.0 1.0 89.0 5.0 0.5

15.0 Ton 1,000.0 m 2,200.0 M 3.0 M 3.5 M 4,000.0 Liter 3.0 M 600.0 Liter 20.0 m3/jam 4,000.0 liter 4,000.0 liter 350.0 liter 80.0 KG 5.0 M3 60.0 CM 75.0 Ton 30.0 Ton 20,000.0 Liter 5.0 ton 5.0 ton 3.0 m3/jam 15.0 Ton 150.0 Ton 0.2 Ton 75.0 kw 0.0 2.50 Ton 15.00 Ton 0.00 5.00 Tahun

0.0

0

276,000,000 3,400,000,000 770,000,000 19,500,000,000 29,250,000,000 395,000,000 395,000,000 1,430,742,857 1,000,000,000 900,000,000 500,000,000 500,000,000 35,000,000 20,000,000 600,000,000 1,350,000,000 1,800,000,000 500,000,000 15,000,000 15,000,000 17,500,000 1,250,000,000 100 100 100 100 100 100 100 100 10,000,000

10.0 5.0 10.0 5.0 5.0 4.0 5.0 2.0 10.0 5.0 6.0 6.0 2.0 4.0 5.0 10.0 5.0 10.0 4.0 8.0 8.0 5.0 5.0 5.0 3.0 5.0 3.0 5.0 5.0 5.0 5.0

1,500.0 2,000.0 1,500.0 2,000.0 2,000.0 1,000.0 2,000.0 1,680.0 1,500.0 2,000.0 2,000.0 2,000.0 2,000.0 1,000.0 2,000.0 1,500.0 2,000.0 1,500.0 2,000.0 1,250.0 1,250.0 2,000.0 2,000.0 2,000.0 900.0 9,600.0 800.0 8,000.0 1,800.0 10,000.0 100.0

Tingkat Suku Bunga = Upah Operator / Sopir / Mekanik = Upah Pembantu Operator/Sopir/Mekanik = Harga Bahan Bakar Bensin = Harga Bahan Bakar Solar = Minyak Pelumas = Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x ( AMP , Aspal Sprayer, Aspal Distribusi ditambah bahan bakar untuk pemanasan Aspal = 1/10

#REF!

ANALISA BIAYA SEWA PERALATAN PER JAM KERJA (I)

ALAT YANG DIPAKAI HARGA

NILAI SISA

FAKTOR PENGEM-

BIAYA

ALAT

BALIAN

PENGEM-

DAN

BIAYA

BAHAN

MINYAK

MODAL

LAIN-LAIN

PASTI / JAM

BAKAR

PELUMAS

(Rp.)

(Rp.)

%

%

ALAT (Rp.)

B 8

BIAYA PASTI PER JAM ASURANSI TOTAL

BAHAN BAKAR & PELUMAS

(Rp.)

-

BALIAN MODAL (Rp.)

(10% X B)

i(1+i)^A ----------(1+i)^A-1

(B - C) x D ----------W

0.002 x B ----------W

(e1 + e2)

12 s/d 15

2.5 s/d 3

C 9

D 10

e1 11

e2 12

E 13

f1 14

f2 15

3,000,000,000 300,000,000 0.16275 292,941.71 4,000.00 296,941.71 0.1500 805,200,000 80,520,000 0.22961 118,851.34 1,150.29 120,001.63 0.1500 125,000,000 12,500,000 0.26380 14,838.61 125.00 14,963.61 0.1200 1,800,000,000 180,000,000 0.26380 213,675.96 1,800.00 215,475.96 0.1200 145,000,000 14,500,000 0.26380 17,212.79 145.00 17,357.79 0.1200 17,550,000 1,755,000 0.57619 6,067.29 23.40 6,090.69 0.1500 325,000,000 32,500,000 0.26380 38,580.38 325.00 38,905.38 0.1200 250,000,000 25,000,000 0.26380 29,677.22 250.00 29,927.22 0.1200 500,000,000 50,000,000 0.26380 59,354.43 500.00 59,854.43 0.1200 1,050,000,000 105,000,000 0.26380 124,644.31 1,050.00 125,694.31 0.1200 165,000,000 16,500,000 0.26380 19,586.96 165.00 19,751.96 0.1200 300,000,000 30,000,000 0.26380 35,612.66 300.00 35,912.66 0.1200 676,000,000 67,600,000 0.26380 80,247.19 676.00 80,923.19 0.1200 498,960,000 49,896,000 0.26380 59,230.98 498.96 59,729.94 0.1200 429,000,000 42,900,000 0.26380 50,926.10 429.00 51,355.10 0.1200 350,000,000 35,000,000 0.26380 41,548.10 350.00 41,898.10 0.1200 450,000,000 45,000,000 0.26380 53,418.99 450.00 53,868.99 0.1200 900,000,000 90,000,000 0.26380 106,837.98 900.00 107,737.98 0.1200 985,000,000 98,500,000 0.26380 116,928.23 985.00 117,913.23 0.1200 14,784,000 1,478,400 0.31547 4,197.53 29.57 4,227.10 0.1500 1,500,000,000 150,000,000 0.26380 178,063.30 1,500.00 179,563.30 0.1200 19,800,000 1,980,000 0.40211 3,582.84 19.80 3,602.64 0.1200 165,000,000 16,500,000 0.26380 19,586.96 165.00 19,751.96 0.1200 150,000,000 15,000,000 0.40211 27,142.75 150.00 27,292.75 0.1200 29,000,000 2,900,000 0.31547 8,233.79 58.00 8,291.79 0.1500 35,000,000 3,500,000 0.26380 4,154.81 35.00 4,189.81 0.1200 159,500,000 15,950,000 0.31547 45,285.83 319.00 45,604.83 0.1500 750,000,000 75,000,000 0.22961 77,492.49 750.00 78,242.49 0.1200 372,900,000 37,290,000 0.22961 38,529.27 372.90 38,902.17 0.1200 1,750,000,000 175,000,000 0.26380 207,740.52 1,750.00 209,490.52 0.1200 1,500,000,000 150,000,000 0.22961 154,984.98 1,500.00 156,484.98 0.1200 17,500,000 1,750,000 0.26380 2,077.41 17.50 2,094.91 0.1200 2,250,000,000 225,000,000 0.22961 232,477.47 2,250.00 234,727.47 0.1200 15,000,000 1,500,000 0.31547 2,129.43 15.00 2,144.43 0.1200 10.00 % per-tahun 15,167 Rupiah per-orang/jam 13,024 Rupiah per-orang/jam 8,500 Rupiah per-liter 10,000 Rupiah per-liter 29,000 Rupiah per-liter si Biaya Pekerjaan ebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16) ANALISA BIAYA SEWA PERALATAN PER JAM KERJA (II)

ALAT YANG DIPAKAI HARGA ALAT

NILAI SISA ALAT

FAKTOR PENGEMBALIAN

BIAYA PENGEM-

MODAL

BALIAN

BIAYA PASTI PER JAM ASURANSI TOTAL DAN BIAYA LAIN-LAIN

PASTI / JAM

0.0300 0.0300 0.0250 0.0250 0.0250 0.0300 0.0250 0.0250 0.0250 0.0250 0.0250 0.0250 0.0250 0.0250 0.0250 0.0250 0.0250 0.0250 0.0250 0.0300 0.0250 0.0250 0.0250 0.0250 0.0300 0.0250 0.0300 0.0250 0.0250 0.0250 0.0250 0.0250 0.0250 0.0250

BAHAN BAKAR & PELUMAS BAHAN MINYAK BAKAR

PELUMAS

(Rp.)

B 8 276,000,000 3,400,000,000 770,000,000 19,500,000,000 29,250,000,000 395,000,000 395,000,000 1,430,742,857 1,000,000,000 900,000,000 500,000,000 500,000,000 35,000,000 20,000,000 600,000,000 1,350,000,000 1,800,000,000 500,000,000 15,000,000 15,000,000 17,500,000 1,250,000,000 100 100 100 100 100 100 100 100 10,000,000

10.00 15,167 13,024 8,500 10,000 29,000

(Rp.)

-

MODAL (Rp.)

(Rp.)

(Rp.)

Lt/HP/Jam

Ltr/HP/Jam

(10% X B)

i(1+i)^A ----------(1+i)^A-1

(B - C) x D ----------W

0.002 x B ----------W

(e1 + e2)

0.125 s/d 0.175

0.01 s/d 0.02

C 9

D 10

e1 11

e2 12

E 13

f1 14

f2 15

0.1500 0.1200 0.1500 0.1200 0.1200 0.1500 0.1200 0.1200 0.1500 0.1200 0.1200 0.1200 0.1200 0.1500 0.1200 0.1500 0.1200 0.1500 0.1200 0.1500 0.1500 0.1200 0.1200 0.1200 0.1500 0.1200 0.1500 0.1200 0.1200 0.1200 0.1500

0.0300 0.0250 0.0300 0.0250 0.0250 0.0300 0.0250 0.0250 0.0300 0.0250 0.0250 0.0250 0.0250 0.0300 0.0250 0.0300 0.0250 0.0300 0.0250 0.0300 0.0300 0.0250 0.0250 0.0250 0.0300 0.0250 0.0300 0.0250 0.0250 0.0250 0.0300

27,600,000 340,000,000 77,000,000 1,950,000,000 2,925,000,000 39,500,000 39,500,000 143,074,286 100,000,000 90,000,000 50,000,000 50,000,000 3,500,000 2,000,000 60,000,000 135,000,000 180,000,000 50,000,000 1,500,000 1,500,000 1,750,000 125,000,000 10 10 10 10 10 10 10 10 1,000,000

0.16275 0.26380 0.16275 0.26380 0.26380 0.31547 0.26380 0.57619 0.16275 0.26380 0.22961 0.22961 0.57619 0.31547 0.26380 0.16275 0.26380 0.16275 0.31547 0.18744 0.18744 0.26380 0.26380 0.26380 0.40211 0.26380 0.40211 0.26380 0.26380 0.26380 0.26380

26,950.64 403,610.15 75,188.37 2,314,822.89 3,472,234.34 112,149.87 46,890.00 441,632.36 97,647.24 106,837.98 51,661.66 51,661.66 9,075.00 5,678.47 71,225.32 131,823.77 213,675.96 48,823.62 2,129.43 2,024.40 2,361.79 148,386.08 0.01 0.01 0.04 0.00 0.05 0.00 0.01 0.00 23,741.77

368.00 3,400.00 1,026.67 19,500.00 29,250.00 790.00 395.00 1,703.27 1,333.33 900.00 500.00 500.00 35.00 40.00 600.00 1,800.00 1,800.00 666.67 15.00 24.00 28.00 1,250.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 200.00

% per-tahun Rupiah per-orang/jam Rupiah per-orang/jam Rupiah per-liter Rupiah per-liter Rupiah per-liter

si Biaya Pekerjaan ebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16) nasan Aspal = 1/1000 x Kapasitas tangki aspal x harga bahan bakar solar ( lihat E 01 , E 03, E 41)

27,318.64 407,010.15 76,215.04 2,334,322.89 3,501,484.34 112,939.87 47,285.00 443,335.63 98,980.57 107,737.98 52,161.66 52,161.66 9,110.00 5,718.47 71,825.32 133,623.77 215,475.96 49,490.29 2,144.43 2,048.40 2,389.79 149,636.08 0.01 0.01 0.04 0.00 0.05 0.00 0.01 0.00 23,941.77

BIAYA OPERASI PER JAM KERJA WORKSHOP PERBAIKAN dan PERAWATAN

BAKAR & PELUMAS

UPAH PEMBANTU

BIAYA

OPERATOR / SOPIR (Rp.) 1 Orang Per Jam Kerja = Rp13,023.8 I 20

OPERASI / JAM (Rp.)

BIAYA

KOEF.

BIAYA

KOEF.

BIAYA

/ SOPIR

(Rp.) f1 x HP x Harga BBM + f2 x HP x Harga Olie F 16

-

(Rp.)

-

(Rp.)

0.0625 s/d 0.0875

(g1 x B') ----W

0.125 s/d 0.175

(g1 x B') ----------W

g1 17

G 18

g1 17

G 18

(Rp.) 1 Orang Per Jam Kerja = Rp15,166.7 H 19

0.1750 0.1750 0.1250 0.1250 0.1250 0.1750 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1750 0.1250 0.1250 0.1250 0.1250 0.1750 0.1250 0.1750 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250

350,000.00 100,650.00 7,812.50 112,500.00 9,062.50 2,047.50 20,312.50 15,625.00 31,250.00 65,625.00 10,312.50 18,750.00 42,250.00 31,185.00 26,812.50 21,875.00 28,125.00 56,250.00 61,562.50 2,587.20 93,750.00 1,237.50 10,312.50 9,375.00 5,075.00 2,187.50 27,912.50 46,875.00 23,306.25 109,375.00 93,750.00 1,093.75 140,625.00 937.50

5,736,780.00 171,588.00 7,700.00 298,375.00 115,500.00 47,400.00 265,650.00 192,500.00 365,750.00 256,025.00 365,750.00 346,500.00 259,875.00 134,750.00 184,800.00 105,875.00 157,850.00 193,462.50 157,850.00 13,035.00 423,500.00 11,550.00 192,500.00 16,940.00 11,139.00 0.00 817,650.00 192,500.00 336,875.00 48,125.00 240,625.00 77,000.00 288,750.00 9,625.00

BAKAR & PELUMAS

BIAYA

0.0875 0.0625 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0625 0.0875 0.0875 0.0875 0.0875 0.0625 0.0875 0.0625 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875

175,000 35,946.43 5,468.75 78,750.00 6,343.75 1,023.75 14,218.75 10,937.50 21,875.00 45,937.50 7,218.75 13,125.00 29,575.00 21,829.50 18,768.75 15,312.50 19,687.50 39,375.00 43,093.75 924.00 65,625.00 866.25 7,218.75 6,562.50 1,812.50 1,531.25 9,968.75 32,812.50 16,314.38 76,562.50 65,625.00 765.63 98,437.50 656.25

BIAYA OPERASI PER JAM KERJA WORKSHOP PERBAIKAN & PERAWATAN

KOEF.

BIAYA

KOEF.

BIAYA

TOTAL

OPERATOR

15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67

39,071.43 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 26,047.62 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81

UPAH OPERATOR PEMBANTU / SOPIR

OPERATOR

F+G+H+I

J 21 6,616,018.10 336,374.90 57,671.73 517,815.48 159,096.73 78,661.73 328,371.73 247,252.98 447,065.48 395,777.98 411,471.73 406,565.48 359,890.48 215,954.98 258,571.73 171,252.98 233,852.98 317,277.98 290,696.73 44,736.68 624,089.29 41,844.23 238,221.73 61,067.98 46,216.98 31,909.23 883,721.73 300,377.98 404,686.10 262,252.98 428,190.48 107,049.85 556,002.98 39,409.23

TOTAL BIAYA OPERASI

(Rp.) f1 x HP x Harga BBM + f2 x HP x Harga Olie F 16 355,500.00 477,400.00 7,110.00 1,732,500.00 770,000.00 272,550.00 221,375.00 202,125.00 317,580.00 558,250.00 405,750.00 365,750.00 38,500.00 9,954.00 423,500.00 296,250.00 385,000.00 118,500.00 77,000.00 7,110.00 7,110.00 154,000.00 192,500.00 5,775.00 7,110.00 134,750.00 23,700.00 1,925.00 171,325.00 9,625.00 1,185.00

-

(Rp.)

-

(Rp.)

0.0625 s/d 0.0875

(g1 x B') ----W

0.125 s/d 0.175

(g1 x B') ----------W

g1 17

G 18

g1 17

G 18

0.0875 0.0875 0.0875 0.0875 0.0875 0.0625 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0625 0.0875 0.0875 0.0875 0.0875 0.0875 0.0625 0.0625 0.0875 0.0875 0.0875 0.0625 0.0875 0.0625 0.0875 0.0875 0.0875 0.0625

16,100.00 148,750.00 44,916.67 853,125.00 1,279,687.50 24,687.50 17,281.25 74,517.86 58,333.33 39,375.00 21,875.00 21,875.00 1,531.25 1,250.00 26,250.00 78,750.00 78,750.00 29,166.67 656.25 750.00 875.00 54,687.50 0.00 0.00 0.01 0.00 0.01 0.00 0.00 0.00 6,250.00

0.1750 0.1250 0.1750 0.1250 0.1250 0.1750 0.1250 0.1250 0.1750 0.1250 0.1250 0.1250 0.1250 0.1750 0.1250 0.1750 0.1250 0.1750 0.1250 0.1750 0.1750 0.1250 0.1250 0.1250 0.1750 0.1250 0.1750 0.1250 0.1250 0.1250 0.1750

32,200.00 212,500.00 89,833.33 1,218,750.00 1,828,125.00 69,125.00 24,687.50 106,454.08 116,666.67 56,250.00 31,250.00 31,250.00 2,187.50 3,500.00 37,500.00 157,500.00 112,500.00 58,333.33 937.50 2,100.00 2,450.00 78,125.00 0.01 0.01 0.02 0.00 0.02 0.00 0.01 0.00 17,500.00

(Rp.) 1 Orang Per Jam Kerja = Rp15,166.7 H 19 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67 15,166.67

/ SOPIR (Rp.) 1 Orang Per Jam Kerja = Rp13,023.8 I 20 39,071.43 39,071.43 39,071.43 39,071.43 39,071.43 39,071.43 39,071.43 39,071.43 39,071.43 39,071.43 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81 13,023.81

/ JAM (Rp.)

F+G+H+I

J 21 458,038.10 892,888.10 196,098.10 3,858,613.10 3,932,050.60 420,600.60 317,581.85 437,335.03 546,818.10 708,113.10 487,065.48 447,065.48 70,409.23 42,894.48 515,440.48 560,690.48 604,440.48 234,190.48 106,784.23 38,150.48 38,625.48 315,002.98 220,690.49 33,965.49 35,300.50 162,940.48 51,890.51 30,115.48 199,515.49 37,815.48 53,125.48

TOTAL BIAYA SEWA ALAT PER JAM KERJA (Rp.)

KET.

E+J

K 22

L 23 6,912,959.81 456,376.53 72,635.33 733,291.44 176,454.51 84,752.41 367,277.11 277,180.19 506,919.91 521,472.29 431,223.69 442,478.14 440,813.67 275,684.91 309,926.83 213,151.08 287,721.97 425,015.96 408,609.96 48,963.77 803,652.59 45,446.87 257,973.69 88,360.73 54,508.76 36,099.04 929,326.56 378,620.47 443,588.27 471,743.49 584,675.46 109,144.76 790,730.45 41,553.65

TOTAL BIAYA SEWA ALAT PER

Pek. Ringan Pek. Ringan Pek. Berat Pek. Berat Pek. Berat Pek. Ringan Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Ringan Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Ringan Pek. Berat Pek. Ringan Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Berat

JAM KERJA (Rp.)

KET.

E+J

K 22

L 23 485,356.73 1,299,898.24 272,313.13 6,192,935.99 7,433,534.94 533,540.47 364,866.85 880,670.66 645,798.67 815,851.07 539,227.14 499,227.14 79,519.23 48,612.95 587,265.80 694,314.25 819,916.44 283,680.76 108,928.65 40,198.87 41,015.27 464,639.06 220,690.50 33,965.50 35,300.54 162,940.48 51,890.55 30,115.48 199,515.50 37,815.48 77,067.25

Pek. Ringan Pek. Berat Pek. Ringan Pek. Berat Pek. Berat Pek. Ringan Pek. Berat Pek. Berat Pek. Ringan Pek. Berat Pek. Berat Pek. Berat Pek. Berat Pek. Ringan Pek. Berat Pek. Ringan Pek. Berat Pek. Ringan Pek. Berat Pek. Ringan Pek. Ringan Pek. Berat Pek. Berat Pek. Berat Pek. Ringan Pek. Berat Pek. Ringan Pek. Berat Pek. Berat Pek. Berat Pek. Ringan

61 62 63 64 64

PILE HAMMER PILE HAMMER, 2,5 Ton STRESSING JACK WELDING MACHINE, 300 A Chain Saw

E60 E61 E62 E63 E64

10.0 1.0 89.0 5.0 0.5

0.0 2.5 15.0 0.0 5.0

0 Ton Ton 0 Tahun

100 100 100 100 10,000,000

51,890.55 30,115.48 199,515.50 37,815.48 77,067.25

T x Te1 x Te2 x Fa

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

I 1 2 3

: AGREGAT KELAS C : PENGADAAN AGREGAT KELAS C : M3

U RAIAN

ASUMSI Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi Base Camp Kegiatan dilakukan di dalam lokasi Base Camp Proporsi campuran : - Agregat Kasar - Pasir

4

Harga Satuan :

5 6 7

Biaya Operasi Alat : - Wheel Loader Faktor Efisiensi Alat : - Wheel Loader Kapasitas Alat : - Wheel Loader

II

- Agregat Kasar - Pasir

URAIAN ANALISA HARGA SAT

KODE KOEFISIEN SATUAN

Ak Ps

32.50 67.50

% %

HSAk HSPs

135,242.03 100,300.00

Rp./M3 Rp./M3

Rp1 Fa1 Cp2

309,926.83 0.83 1.50

Rp./Jam M3

METHODE PELAKSANAAN 1

III.1

Wheel Loader melakukan pencampuran (blending) Agregat Kasar, Pasir & Tanah menjadi Agregat Kelas C.

PROSES PENCAMPURAN AGREGAT KELAS C Untuk setiap 1 M3 Agregat Kelas C, diperlukan :

1.a.

1.b. III.2

- Agregat Kasar = Ak x 1 M3 - Pasir = Ps x 1 M3 - Tanah = Tn x 1 M3 - Total volume agregat = Vk + Vp + Vt Waktu pencampuran (blending) oleh Blending Equipmen

Vk Vp Vt Va

0.325 0.675 0.000 1.000

M3 M3 M3 M3

Tc

0.083

Jam/M3

HARGA SATUAN BAHAN AGREGAT KELAS C

2.a.

Agregat Kasar

= Vk x HSAk

Hs1

32,597.50

Rupiah

2.b.

Pasir

= Vh x HSPs

Hs2

91,288.37

Rupiah

2.c.

Tanah

= Vs x HSTn

Hs3

0.00

Rupiah

2.d.

Biaya Pencampuran

= Tc x Rp1

Hs4

25,827.24

Rupiah

2.e.

Harga Satuan Agregat Kelas C / M3 = Hs1 + Hs2 + Hs3 + Hs4

HSAB

149,713.10

Rupiah

URAIAN ANALISA HARGA SATUAN

KETERANGAN

Kap. Bucket

Di luar PPN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 3.1.(6) : Galian Perkerasan Beraspal dengan Cold Milling Machine : M3

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

Jam Jam

PERKIRAAN KUANTITAS

0.6693 0.1673

JUMLAH HARG B.

BAHAN

JUMLAH HAR C. 1. 2. 3.

PERALATAN Cold Milling Dump Truck Alat bantu

(E36) (E08)

Jam Jam Ls

0.3179 1.0672 1.0000

JUMLAH HARGA P D. E. F. Note: 1 2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali

3 4

terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-316

UK HARGA SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

12,600.00 17,309.52

: Err:509 : Err:509 :

Err:509

JUMLAH HARGA (Rp.)

8,433.73 2,896.51

JUMLAH HARGA TENAGA

11,330.24

JUMLAH HARGA BAHAN

0.00

1,299,898.24 277,180.19 9,000.00

JUMLAH HARGA PERALATAN

volume dan/atau ukuran

an satu satuan pekerjaan ak dapat diubah kecuali

413,287.59 295,806.78 9,000.00

718,094.38 729,424.62 72,942.46 802,367.08

si Kepada Peserta Lelang

tapi tidak termasuk PPN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 6.1 (1)(a) : Lapis Resap Pengikat - Aspal Cair : Liter

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

Jam Jam

PERKIRAAN KUANTITAS

0.0021 0.0004

JUMLAH HARGA T B.

BAHAN

1. 2.

Aspal Kerosene

(M10) (M11)

Kg liter

0.6790 0.3708

JUMLAH HARGA B C.

PERALATAN

1. 2.

Asp. Distributor Compressor

E41 E05

Jam Jam

0.0002 0.0002

JUMLAH HARGA PERA D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-611a

K ARGA SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

12,600.00 17,309.52

JUMLAH HARGA TENAGA

11,000.00 10,000.00

JUMLAH HARGA BAHAN

364,866.85 176,454.51

JUMLAH HARGA PERALATAN

olume dan/atau ukuran

: Err:509 : Err:509 :

Err:509

JUMLAH HARGA (Rp.)

26.25 7.21

33.46

7,468.74 3,708.00

11,176.74

76.01 36.76

112.78 11,322.97 1,132.30 12,455.27

satu satuan pekerjaan k dapat diubah kecuali Kepada Peserta Lelang

api tidak termasuk PPN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN polimer asbuton semi extraksi PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 6.3(5b) : Laston Lapis Aus Modifikasi (AC-WC Mod) : Ton

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

Jam Jam

PERKIRAAN KUANTITAS

0.2008 0.0201

JUMLAH HARGA T

B.

BAHAN

1. 2. 3 4

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 0 - 5) Semen Aspal Modifikasi

(M05) (M10)

M3 M3 Kg Kg

0.2975 0.3519 9.8700 63.8600

JUMLAH HARGA B C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asp. Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E09 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0120 0.0120 0.4688 0.0137 0.0135 0.0058 1.0000

JUMLAH HARGA PERA D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-635b

K ARGA SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN DASAR (Rp.)

12,600.00 17,309.52

JUMLAH HARGA TENAGA

121,145.22 152,863.04 900.00 7,800.00

JUMLAH HARGA BAHAN

309,926.83 6,912,959.81 442,478.14 506,919.91 456,376.53 287,721.97 425,015.96 0.00

: Err:509 : Err:509 :

Err:509

JUMLAH HARGA (Rp.)

2,530.12 347.58

2,877.70

36,046.67 53,795.13 8,883.00 498,108.00

596,832.81

2,966.43 83,288.67 5,331.06 237,618.71 6,269.97 3,891.13 2,466.13 0.00

JUMLAH HARGA PERALATAN

olume dan/atau ukuran

satu satuan pekerjaan k dapat diubah kecuali Kepada Peserta Lelang

api tidak termasuk PPN

341,832.10 941,542.61 94,154.26 1,035,696.87

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 6.3(5c) : Laston Lapis Aus Perata (AC-WC(L)) : Ton

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

PERKIRAAN KUANTITAS

Jam Jam

0.2008 0.0201

JUMLAH HARGA T B.

BAHAN

1. 2. 3. 4.

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 0 - 5) Semen Aspal

(M05) (M10)

M3 M3 Kg Kg

0.2978 0.3523 9.8700 62.8300

JUMLAH HARGA B C. 1. 2. 3. 4. 5. 6. 7. 8.

PERALATAN Wheel Loader AMP Genset Dump Truck Asp. Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E09 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0201 0.7813 0.0137 0.0135 0.0058 1.0000

JUMLAH HARGA PERA D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT HARGA SATUAN PEKERJAAN ( D + E )

10.0 % x D

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-635c

K ARGA SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

12,600.00 17,309.52

JUMLAH HARGA TENAGA

121,145.22 152,863.04 900.00 11,000.00

JUMLAH HARGA BAHAN

309,926.83 6,912,959.81 442,478.14 506,919.91 456,376.53 287,721.97 425,015.96 0.00 JUMLAH HARGA PERALATAN

: Err:509 : Err:509 :

Err:509

JUMLAH HARGA (Rp.)

2,530.12 347.58

2,877.70

36,082.51 53,856.47 8,883.00 691,130.00

789,951.98

2,966.43 138,814.45 8,885.10 396,031.18 6,269.97 3,891.13 2,466.13 0.00 559,324.39 1,352,154.07 135,215.41 1,487,369.48

olume dan/atau ukuran

satu satuan pekerjaan k dapat diubah kecuali Kepada Peserta Lelang

api tidak termasuk PPN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 6.3(6b) : Laston Lapis Antara Modifikasi (AC-BC Mod) : Ton

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

Jam Jam

PERKIRAAN KUANTITAS

0.2008 0.0201

JUMLAH HARGA T B.

BAHAN

1. 2. 3 4

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 0 - 5) Filler Added Aspal modifikasi

(M10)

M3 M3 Kg Kg

0.3443 0.3092 9.3450 62.1090

JUMLAH HARGA B C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E09 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0070 0.0070 0.2734 0.0110 0.0108 0.0046 1.0000

JUMLAH HARGA PERA D.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. F. Note: 1 2

3 4

OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-636b

K ARGA SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

12,600.00 17,309.52

JUMLAH HARGA TENAGA

121,145.22 152,863.04 900.00 7,800.00

JUMLAH HARGA BAHAN

309,926.83 6,912,959.81 442,478.14 506,919.91 456,376.53 287,721.97 425,015.96 0.00

JUMLAH HARGA PERALATAN

: Err:509 : Err:509 :

Err:509

JUMLAH HARGA (Rp.)

2,530.12 347.58

2,877.70

41,715.19 47,272.65 8,410.50 484,450.20

581,848.55

2,966.43 48,585.06 3,109.79 138,610.91 5,015.98 3,112.90 1,972.90 0.00

203,373.97 788,100.22

olume dan/atau ukuran

satu satuan pekerjaan k dapat diubah kecuali Kepada Peserta Lelang

api tidak termasuk PPN

78,810.02 866,910.24

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 6.3(6d) : Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) Leveling : Ton

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

Jam Jam

PERKIRAAN KUANTITAS

0.2008 0.0201

JUMLAH HARGA T B.

BAHAN

1. 2. 3 4

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 0 - 5) Filler Added Aspal Modifikasi

(M05) (M10)

M3 M3 Kg Kg

0.3443 0.3092 9.3450 62.1090

JUMLAH HARGA B C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E09 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0120 0.0120 0.4688 0.0110 0.0108 0.0046 1.0000

JUMLAH HARGA PERA

D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-636d

K ARGA SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

12,600.00 17,309.52

JUMLAH HARGA TENAGA

121,145.22 152,863.04 900.00 7,800.00

JUMLAH HARGA BAHAN

309,926.83 6,912,959.81 442,478.14 506,919.91 456,376.53 287,721.97 425,015.96 0.00

JUMLAH HARGA PERALATAN

: Err:509 : Err:509 :

Err:509

JUMLAH HARGA (Rp.)

2,530.12 347.58

2,877.70

41,715.19 47,272.65 8,410.50 484,450.20

581,848.55

2,966.43 83,288.67 5,331.06 237,618.71 5,015.98 3,112.90 1,972.90 0.00

339,306.65

olume dan/atau ukuran

satu satuan pekerjaan k dapat diubah kecuali Kepada Peserta Lelang

api tidak termasuk PPN

924,032.90 92,403.29 1,016,436.19

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 6.3(7b) : Laston Lapis Pondasi Modifikasi (AC-Base Mod) : Ton

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

PERKIRAAN KUANTITAS

Jam Jam

0.2008 0.0201

JUMLAH HARGA T B.

BAHAN

1. 2. 3 4 5

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 5 - 9,5) Lolos screen2 ukuran ( 0 - 5) Filler Added Aspal Modifikasi

(M05) (M10)

M3 M3 M3 Kg Kg

0.1304 0.2953 0.2394 9.8700 58.7100

JUMLAH HARGA B C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

D. E.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT

E15 E01 E12 E09 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0173 0.0070 0.0070 0.2734 0.0092 0.0090 0.0052 1.0000

JUMLAH HARGA PERA 10.0 % x D

F.

HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-612b

K ARGA SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

12,600.00 17,309.52

JUMLAH HARGA TENAGA

121,145.22 135,242.03 152,863.04 900.00 7,800.00 JUMLAH HARGA BAHAN

309,926.83 6,912,959.81 442,478.14 506,919.91 456,376.53 287,721.97 425,015.96 0.00

JUMLAH HARGA PERALATAN

: Err:509 : Err:509 :

Err:509

JUMLAH HARGA (Rp.)

2,530.12 347.58

2,877.70

15,792.81 39,941.16 36,589.28 8,883.00 457,938.00 559,144.25

5,369.23 48,585.06 3,109.79 138,610.91 4,179.98 2,594.09 2,192.12 0.00

204,641.17 766,663.13 76,666.31

olume dan/atau ukuran

satu satuan pekerjaan k dapat diubah kecuali Kepada Peserta Lelang

api tidak termasuk PPN

843,329.44

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : Skh 1.6.8 : Asphalt Sealcoat dengan Bahan Asbuton Mastik Emulsi : M2

NO.

KOMPONEN

A.

TENAGA

1. 2. 3 4

Pekerja Mandor Operator Sopir

SATUAN

(L01) (L03) (L04) (L06)

Jam Jam Jam Jam

PERKIRAAN KUANTITAS

0.0897 0.0120 0.0419 0.0838

JUMLAH HARGA T B.

BAHAN

1. 2. 3 4 5 6 7

Aggregat Halus Bahan Pengisi (Semen) Aspal Emulsi (AE CQS-1P) Asbuton Matic Emulsi Additive (Bahan Tambah) Air Tack Coat - Asphalt Emulsi (AE CSS -1R)

M3 Kg Kg Kg Ltr Kg Kg

0.0009 0.0787 0.5906 1.3781 0.0197 0.4730 0.1100

JUMLAH HARGA B C. 1. 2. 3. 4. 5.

PERALATAN Asphalt Sprayer Compressor Mobile Mixer Dump Truck Alat Bantu

E03 E05 E06 E08

Jam Jam Jam Jam Ls

0.0032 0.0002 0.0060 0.0060 1.0000

JUMLAH HARGA PERA

D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

10.0 % x D

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-612b

K ARGA SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

12,600.00 17,309.52 15,166.67 14,452.38 JUMLAH HARGA TENAGA

152,863.04 1,240.00 20,000.00 7,000.00 95,000.00 1,000.00 11,000.00 JUMLAH HARGA BAHAN

72,635.33 176,454.51 84,752.41 277,180.19 1,000.00

JUMLAH HARGA PERALATAN

: Err:509 : Err:509 :

Err:509

JUMLAH HARGA (Rp.)

1,130.22 207.71 635.48 1,211.11 3,184.53

137.58 97.59 11,812.00 9,646.70 1,871.50 473.00 1,210.00 25,248.36

232.43 35.29 508.51 1,663.08 1,000.00

3,439.32

olume dan/atau ukuran

satu satuan pekerjaan k dapat diubah kecuali Kepada Peserta Lelang

api tidak termasuk PPN

31,872.21 3,187.22 35,059.43

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 6.3(7c) : Laston Lapis Pondasi Perata (AC-Base(L)) : Ton

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

Jam Jam

PERKIRAAN KUANTITAS

0.2008 0.0201

JUMLAH HARGA T B.

BAHAN

1 2 3 4 5

Lolos screen2 ukuran ( 9.5 - 19,0) Lolos screen2 ukuran ( 5 - 9,5) Lolos screen2 ukuran ( 0 - 5) Semen Aspal

(M05) (M10)

M3 M3 M3 Kg Kg

0.1316 0.2981 0.2416 9.9750 49.4400

JUMLAH HARGA B C. 1. 2. 3. 4. 5. 6. 7 8

PERALATAN Wheel Loader AMP Genset Dump Truck Asphalt Finisher Tandem Roller P. Tyre Roller Alat Bantu

E15 E01 E12 E09 E02 E17 E18

Jam Jam Jam Jam Jam Jam Jam Ls

0.0096 0.0201 0.0201 0.3982 0.0092 0.0090 0.0052 1.0000

JUMLAH HARGA PERA D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-637c

K ARGA SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

HARGA SATUAN (Rp.)

12,600.00 17,309.52

JUMLAH HARGA TENAGA

121,145.22 135,242.03 152,863.04 900.00 11,000.00 JUMLAH HARGA BAHAN

309,926.83 6,912,959.81 442,478.14 506,919.91 456,376.53 287,721.97 425,015.96 0.00 JUMLAH HARGA PERALATAN

olume dan/atau ukuran

: Err:509 : Err:509 :

Err:509

JUMLAH HARGA (Rp.)

2,530.12 347.58

2,877.70

15,945.10 40,321.17 36,936.87 8,977.50 543,840.00 646,020.64

2,966.43 138,814.45 8,885.10 201,857.09 4,179.98 2,594.09 2,192.12 0.00 361,489.26 1,010,387.60 101,038.76 1,111,426.36

satu satuan pekerjaan k dapat diubah kecuali Kepada Peserta Lelang

api tidak termasuk PPN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 1.8 : Manajemen dan Keselamatan Lalu Lintas : Lump Sum

No.

U RAIAN

A. 1 2 3 4 5

B. 1 2 3 4 5

DATA DAN ASUMSI Panjang Lokasi Pekerjaan Total Masa Pelaksanaan Kegiatan Masa Mobilisasi Periode Pekerjaan Perkerasan Jalan Panjang zona kerja Perkerasan Jalan

SATUAN

PERKIRAAN KUANTITAS

KM Bulan Bulan Bulan M

112.36 9.00 2.00 7.00 7,500.00

Buah M' Buah Buah Buah Buah Buah Buah Buah Rol Set Set

6.00 112.00 10.00 10.00 3.00 4.00

36.00

URUTAN KERJA Penyedia menyiapkan perlengkapan keselamatan jalan selama periode konstruksi sesuai ketentuan Buat rencana kerja manajemen lalu-lintas sesuai schedule pekerjaan dan koordinasikan dengan seluruh personil yang terkait Kelompok kerja pengatur lalu-lintas selama konstruksi menggunakan tenaga pengatur dan flagman dengan 3 shift Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait Semua rambu harus jelas dan terbaca oleh Pengguna Jalan

C. 1 2 3 4 5 6 7 8 9 10 11 12

PERALATAN KESELAMATAN LALU LINTAS Rambu panah berkedip Rambu suar berkedip portabel Rambu tetap informasi pengalihan/pengaturan lalu lintas Rambu portabel informasi pengalihan/pengaturan lalu lintas Rambu penghalang lalu-lintas jenis plastik (traffic Cone) Rambu penghalang lalu-lintas jenis beton Rambu Peringatan Rambu Petunjuk Berikade kayu 1/2 lebar jalan Police line Peralatan komunikasi dan Lainnya Perlengkapan pengatur lalu-lintas (safety boots, helm rompi dll)

D.

TENAGA / PERSONIL 1

Pekerja (Flagman)

OB

2

Koordinator / Pengatur

OB

-

E

TOTAL BIAYA MANAJEMEN DAN KESELAMATAN LALU LINTAS

Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN), Asuransi Tenaga Kerja dan pengeluaran lainnya. 2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan biaya perijinan y diperlukan dengan pihak terkait dengan manajemen lalu-lintas 3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang diperlukan seperti material habis pakai baterai, lampu dan sebagainya

Analisa El - 18

A SATUAN

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

1,000,000.00 175,000.00 100,000.00 300,000.00 150,000.00 150,000.00 200,000.00 1,000,000.00 5,000,000.00 1,000,000.00

1,800,000.00 16,800,000.00 1,500,000.00 2,000,000.00 3,000,000.00 4,000,000.00

2,000,000.00

72,000,000.00

2,500,000.00

-

PPN), Asuransi Tenaga Kerja

u-lintas dan biaya perijinan yang

endukung yang diperlukan

101,100,000.00

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 1.21. : Manajemen Mutu : Lump Sum

No.

U RAIAN

A. 1 2 3 4

B. 1 2 3 4

C.

D

SATUAN

PERKIRAAN KUANTITAS

DATA DAN ASUMSI Tidak ada pengadaan peralatan pengujian mutu dan perlengkapan perangkat alat tulis dan kantor Hanya Jasa Pengendalian Mutu Pekerjaan dilapangan selama masa pelaksanaan pekerjaan Personil melakukan pengendalian mutu berdasarkan spesifikasi pekerjaan dan membuat laporan mutu pekerjaan Manajemen Mutu sesuai ketentuan Ditjen Bina Marga

URUTAN KERJA Penyedia setelah menerima SPMK mengusulkan personil Tenaga Ahli Mutu Pekerjaan sbg Manajer Kendali Mutu Tenaga Ahli dibantu oleh Asisten Kendali Mutu yang berpengalaman dibidangnya dan tenaga pendukung Membuat RMK dan laporan mutu yg disetujui PPK Melakukan pengendalian mutu semua pekerjaan dan membuat laporan secara berkala

TENAGA / PERSONIL

1

Masa Pelaksanaan Pekerjaan Ahli Kendali Mutu

Bulan OB

9.00 9.00

2

Asisten Ahli Kendali Mutu

OB

9.00

3

Staff Pendukung (supporting Staff)

OB

-

4

Laporan Kendali Mutu

Bulan

9.00

TOTAL BIAYA PENGENDALIAN MUTU

Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN), Asuransi Tenaga Kerja dan pengeluaran lainnya.

2. Biaya tersebut sudah termasuk biaya pembuatan laporan yang terkait dengan mutu pekerjaan 3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang diperlukan pembuatan laporan mutu seperti komputer, printer, kertas dan sebagainya.

Analisa El - 121

A SATUAN

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

3,500,000.00

31,500,000.00

2,500,000.00

22,500,000.00

2,000,000.00 400,000.00

3,600,000.00

57,600,000.00

utu pekerjaan endukung yang

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 7.15.(2) : Pembongkaran Beton : M3

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

PERKIRAAN KUANTITAS

Jam Jam

12.5000 1.0417

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C. 1. 2. 3. 4. 5

PERALATAN Compressor Jack Hammer Wheel Loader Dump Truck Alat bantu

E05 E26 E15 E08

Jam Jam Jam Jam Ls

1.0417 1.0417 0.0101 0.6098 1.0000

JUMLAH HARGA PERALATAN D. E. F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E )

Note: 1 2

3 4

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelan Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-7152

UNTUK NG HARGA SATUAN

PERKIRAAN VOL. PEK. : Err:509 TOTAL HARGA (Rp.) : Err:509 % THD. BIAYA PROYEK :

Err:509

HARGA SATUAN

JUMLAH HARGA

(Rp.)

(Rp.)

12,600.00 17,309.52

157,500.00 18,030.75

JUMLAH HARGA TENAGA

175,530.75

JUMLAH HARGA BAHAN

0.00

176,454.51 36,099.04 309,926.83 277,180.19 0.00

JUMLAH HARGA PERALATAN

183,806.78 37,603.16 3,139.78 169,023.39 0.00

393,573.11 569,103.87 56,910.39 626,014.25

dan Peralatan, volume dan/atau ukuran

k menyelesaikan satu satuan pekerjaan nyedia Jasa tidak dapat diubah kecuali n dalam Instruksi Kepada Peserta Lelang habis dipakai dan operator. ng berkaitan (tetapi tidak termasuk PPN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : Skh - 1.10.1(13) : Pengecatan Sederhana : M2

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

1.5000 0.5000 0.0550 JUMLAH HARGA TENAGA

B.

BAHAN

1. 2. 3

Cat Minyak Thinner Amplas

Kg M3 lbr

0.5000 0.3000 0.3000

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelan Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa Skh-110113

UNTUK NG HARGA SATUAN

PERKIRAAN VOL. PEK. : Err:509 TOTAL HARGA (Rp.) : Err:509 % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

12,600.00 14,452.38 17,309.52 JUMLAH HARGA TENAGA

45,000.00 Err:509 2,000.00

JUMLAH HARGA BAHAN

65.00

JUMLAH HARGA PERALATAN

dan Peralatan, volume dan/atau ukuran

Err:509

JUMLAH HARGA (Rp.)

18,900.00 7,226.19 952.02 27,078.21

22,500.00 Err:509 600.00

Err:509

65.00

65.00 Err:509 Err:509 Err:509

k menyelesaikan satu satuan pekerjaan nyedia Jasa tidak dapat diubah kecuali n dalam Instruksi Kepada Peserta Lelang habis dipakai dan operator. ng berkaitan (tetapi tidak termasuk PPN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : Skh - 1.10.1(1) : Pembersihan Jembatan : M2

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

1.2000 0.5000 0.0500 JUMLAH HARGA TENAGA

B.

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelan Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa Skh-11011

UNTUK NG HARGA SATUAN

PERKIRAAN VOL. PEK. : Err:509 TOTAL HARGA (Rp.) : Err:509 % THD. BIAYA PROYEK :

HARGA SATUAN (Rp.)

12,600.00 14,452.38 17,309.52

Err:509

JUMLAH HARGA (Rp.)

15,120.00 7,226.19 865.48

JUMLAH HARGA TENAGA

23,211.67

JUMLAH HARGA BAHAN

0.00

150.00

JUMLAH HARGA PERALATAN

dan Peralatan, volume dan/atau ukuran

150.00

150.00 23,361.67 2,336.17 25,697.83

k menyelesaikan satu satuan pekerjaan nyedia Jasa tidak dapat diubah kecuali n dalam Instruksi Kepada Peserta Lelang habis dipakai dan operator. ng berkaitan (tetapi tidak termasuk PPN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA MATA PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 8.1 (1) : Pondasi Agregat Kls. A Untuk : M3 Pek. Minor

NO.

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Biasa Mandor

SATUAN

(L01) (L03)

jam jam

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

0.1134 0.0076

HARGA SATUAN (Rp.)

12,600.00 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1.

Agregat Pecah Kasar

M3

1.2586

126,431.52

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2. 3. 4. 5.

Wheel Loader Dump Truck Pedestrian Roller Water Tanker Alat Bantu

E15 E08 E24 E23

jam jam jam jam Ls

0.0076 1.2920 0.0527 0.0141 1.0000

309,926.83 277,180.19 88,360.73 257,973.69 0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan.

JU HA (

2

3 4

Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-811

: Err:509 : Err:509 :

dan/atau ukuran

Err:509

JUMLAH HARGA (Rp.)

1,428.77 130.85

1,559.63

159,127.88

159,127.88

2,342.94 358,125.67 4,653.93 3,626.14 0.00

368,748.68 529,436.19 52,943.62 582,379.81

satuan pekerjaan at diubah kecuali da Peserta Lelang

ak termasuk PPN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: Sumatera Barat : 8.3.(1a) : Stabilisasi Dengan Tanaman : M2

NO.

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

PERKIRAAN KUANTITAS

0.2800 0.1400 0.0700

HARGA SATUAN (Rp.)

JU HA (

12,600.00 14,452.38 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

1.

Gebalan Rumput

M32

M2

1.1000

25,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

0.00

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

2

3 4

berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI-831

: Err:509 : Err:509 :

dan/atau ukuran

Err:509

JUMLAH HARGA (Rp.)

3,528.00 2,023.33 1,211.67 6,763.00

27,500.00

27,500.00

0.00

0.00 34,263.00 3,426.30 37,689.30

satuan pekerjaan at diubah kecuali da Peserta Lelang

ak termasuk PPN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 8.3.(3) PERKIRAAN VOL. PEK. : Pohon TOTAL HARGA (Rp.) : Buah % THD. BIAYA PROYEK

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

0.4200 0.0000 0.0700

HARGA SATUAN (Rp.)

JU HA (

12,600.00 14,452.38 17,309.52

JUMLAH HARGA TENAGA

B.

BAHAN

1.

- pohon - Tanah humus setebal 20 cm - Pupuk

bh m3 kg

1.0000 0.2200 0.5000

135,000.00 7,800.00 12,000.00

JUMLAH HARGA BAHAN C.

PERALATAN

1.

Alat Bantu

Ls

1.0000

0.00

JUMLAH HARGA PERALATAN

D. E. F. Note: 1 2

3 4

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa LI-833

: Err:509 : Err:509 :

Err:509

JUMLAH HARGA (Rp.)

5,292.00 0.00 1,211.67

6,503.67

135,000.00 1,716.00 6,000.00

142,716.00

0.00

0.00

dan/atau ukuran

satuan pekerjaan at diubah kecuali da Peserta Lelang

ak termasuk PPN

149,219.67 14,921.97 164,141.63

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 8.4.(6) .(a) : Patok Kilometer : BH

KOMPONEN

A.

TENAGA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

5.2250 2.0900 1.0450 JUMLAH HARGA TENAGA

B.

BAHAN

1. 2. 3.

Beton K-175 Baja Tulangan Cat, dan material lainnya

(M60) (M39)

M3 Kg Ls

0.1512 22.6800 1.0000

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Dump Truck Alat Bantu

E08

Jam Ls

1.0450 1.0000

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelan 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-846a

UNTUK SING HARGA SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: Err:509 : Err:509 :

HARGA SATUAN (Rp.)

12,600.00 14,452.38 17,309.52 JUMLAH HARGA TENAGA

938,025.02 10,500.00 50,000.00

JUMLAH HARGA BAHAN

277,180.19 9,000.00

JUMLAH HARGA PERALATAN

ja dan Peralatan, volume dan/atau ukuran

Err:509

JUMLAH HARGA (Rp.)

65,835.00 30,205.48 18,088.45 114,128.93

141,829.38 238,140.00 50,000.00

429,969.38

289,653.30 9,000.00

298,653.30 842,751.61 84,275.16 927,026.77

ntuk menyelesaikan satu satuan pekerjaan Penyedia Jasa tidak dapat diubah kecuali uan dalam Instruksi Kepada Peserta Lelang an habis dipakai dan operator. yang berkaitan (tetapi tidak termasuk PPN

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : 8.4.(7) : Rel Pengaman : M'

KOMPONEN

A.

PEKERJA

1. 2. 3.

Pekerja Biasa Tukang Mandor

SATUAN

(L01) (L02) (L03)

jam jam jam

PERKIRAAN KUANTITAS

4.2311 1.0578 0.5289 JUMLAH HARGA TENAGA

B.

BAHAN

1. 2. 3. 4.

Rel Pengaman Patok Beton K-175 Baja Tulangan Baut, dan material lain

(M36) (M38) (M39)a

M' buah buah buah

1.0000 0.0929 4.6452 1.0000

JUMLAH HARGA BAHAN C.

PERALATAN

1. 2.

Dump Truck Alat Bantu

E08

Jam Ls

0.5289 1.0000

JUMLAH HARGA PERALATAN D. E. F. Note: 1

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10.0 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelan 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-847

UNTUK SING HARGA SATUAN

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: Err:509 : Err:509 :

HARGA SATUAN (Rp.)

12,600.00 14,452.38 17,309.52 JUMLAH HARGA TENAGA

985,000.00 938,025.02 10,500.00 0.00

JUMLAH HARGA BAHAN

277,180.19 0.00

JUMLAH HARGA PERALATAN

ja dan Peralatan, volume dan/atau ukuran

Err:509

JUMLAH HARGA (Rp.)

53,312.00 15,287.41 9,154.81 77,754.22

985,000.00 87,145.38 48,774.10 0.00

1,120,919.47

146,597.52 0.00

146,597.52 1,345,271.22 134,527.12 1,479,798.34

ntuk menyelesaikan satu satuan pekerjaan Penyedia Jasa tidak dapat diubah kecuali uan dalam Instruksi Kepada Peserta Lelang an habis dipakai dan operator. yang berkaitan (tetapi tidak termasuk PPN

Analisa FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROPINSI ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat : Skh 1.10.1 (17) PERKIRAAN VOL. PEK. : : : Pengendalian Tanaman Pada Rumija TOTAL HARGA (Rp.) : Ls % THD. BIAYA PROYEK :

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

(L01) (L03)

Jam Jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

9.0000 4.0000

12,600.00 17,309.52

JUMLAH HARGA TENAGA B.

BAHAN

JUMLAH HARGA BAHAN C.

PERALATAN

1 2 3

Pick Up Alat Potong Rumput 2 unit Alat Bantu

Jam Jam Ls

9.0000 4.0000 1.0000

50,000.00 35,000.00 5,000.00

JUMLAH HARGA PERALATAN D. E. F. G. H.

Jumlah harga Tenaga, Bahan dan Peralatan : ( A + B + C ) Over Head and Profit : 10.0 % x D Harga Satuan Pekerjaan : ( D + E ) APABILA SELAMA PERIODE KONTRAK 9 PEMOTONGAN MAKA TOTAL HARGA Panjang Penanganan adalah 90,446 km maka Total Harga

JUM HA (R

Note: 1 2 3

Perkiraan kuantitas yang dicantumkan harus diperkirakan mendekati kondisi sebenarnya. Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan. Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan M Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini

Analisa Skh-110117

N

Err:509 Err:509 Err:509

JUMLAH HARGA (Rp.)

113,400.00 69,238.10

182,638.10

0.00

450,000.00 140,000.00 5,000.00

595,000.00 777,638.10 77,763.81 855,401.90 7,698,617.14 696,309,126.10

PPN yang dibayarkan

njadi dasar penetapan Mata alan dilakukan sesuai kkan dalam Analisa ini.

ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

No.

: 10.1 (1) : Pemeliharaan Rutin Perkerasan : Lump Sum / Bulan

U RAIAN

I. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

II.

DATA & ASUMSI Jam kerja efektif per-hari Lebar Jalan Existing Lebar Total Bahu Jalan Existing (Kiri + Kanan) Tebal Campuran Aspal Panas/Dingin Rata-rata Tebal Penetrasi Macadam Rata-rata Aplikasi Aspal Pengisian Retak Rata-rata Panjang Jalan Proyek Prosentase permukaan yang perlu dipelihara (Wr < 6m) Prosentase permukaan yang perlu dipelihara (Wr > 6m) Total waktu penyelesaian proyek Prosentase waktu pekerja utk pemeliharaan permukaan Prosentase waktu mandor utk pemeliharaan permukaan Prosentase waktu alat berat untuk pemeliharaan Jumlah Pekerja 3.00 regu kerja @ 5orang Jumlah Mandor

KODE

KOEF.

SATUAN

Tk Wr Ws t h Ar Lp Ap1 Ap2 Tp Tpk Tmd Te Pk Md

7.00 7.00 3.00 0.04 0.055 1.50 5.00 1.00 2.00 270.00 1.00 1.00 1.00 15.00 3.00

jam Meter Meter Meter Meter Ltr/M2 Km % % Hari % % % orang orang

(L01) (L03)

283.50 56.70

Jam Jam

11.20 11.20 7.70 1,050 10.00

M3 M3 M3 Liter %

18.90 18.90 18.90

Jam Jam Jam

PEKERJA 1 2

III.

Kebutuhan Pekerja Kebutuhan Mandor

= Pk x Tpk x Tp x Tk = Md x Tmd x Tp x Tk

BAHAN 1 2 3 4 5

IV.

Camp. Aspal Panas = (Ap x t x Wr x Lp x 1000) x % Camp. Aspal Dingin = (Ap x t x Wr x Lp x 1000) x % Penetrasi Macadam = (Ap x h x Wr x Lp x 1000) x % Aspal Pengisi Retak = Ar x Ap x Wr x Lp x 1000 Bahan-bahan lainnya (diasumsikan)

(EI-10B) (EI-10D) (EI-10C) (EI-10E)

ALAT 1 2 3

Motor Grader Flat Bed Truck Air Compressor

= Te x Tp x Tk = Te x Tp x Tk = Te x Tp x Tk

(E13) (E11) (E05)

KETERANGAN

Retak sedang Thd. Total Luas Thd. Total Luas Thd. Total Waktu Thd. Total Waktu Thd. Total Waktu

40% 40% 20% Thd.Biaya Bahan

BAGIAN PEKERJAAN YANG DI SUB KONTRAKKAN Satker / PPK

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

No. Paket Kontrak : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) Nama Paket

: PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

Pro/Kab/Kodya

: Sumatera Barat

No. Mata No

Pembaya ran

URAIAN PEKERJAAN

SAT

VOLUME

JUMLAH HARGA (Rp.)

BOBOT (%)

KETERANGAN

N I H I L

JUMLAH

-

-

Padang, 11 Februari 2019 Pelaksana, PT. CITRA PERMATA SULUNG

FARDI MUABAROK Direktur Utama

DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA BIAYA No.

URAIAN

KO

HP

KAP.

DE

HARGA

SEWA

ALAT

ALAT/JAM (di luar PPN)

1

ASPHALT MIXING PLANT

E01

294.0

3,000,000,000

6,912,959.81

2

ASPHALT FINISHER

E02

72.4

10.0 Ton

805,200,000

456,376.53

3

ASPHALT SPRAYER

E03

4.0

850.0 Liter

125,000,000

72,635.33

4

BULLDOZER 100-150 HP

E04

155.0 -

1,800,000,000

733,291.44

5

COMPRESSOR 4000-6500 L\M

E05

60.0

145,000,000

176,454.51

6

CONCRETE MIXER 0.3-0.6 M3

E06

20.0

500.0 Liter

17,550,000

84,752.41

7

CRANE 10-15 TON

E07

138.0

15.0 Ton

325,000,000

367,277.11

8

DUMP TRUCK 3.5 TON

E08

100.0

3.5 Ton

250,000,000

277,180.19

9

DUMP TRUCK 10 TON

E09

190.0

10.0 Ton

500,000,000

506,919.91

10

EXCAVATOR 80-140 HP

E10

133.0

0.9 M3

1,050,000,000

521,472.29

11

FLAT BED TRUCK 3-4 M3

E11

190.0

10.0 ton

165,000,000

431,223.69

12

GENERATOR SET

E12

180.0

135.0 KVA

300,000,000

442,478.14

13

MOTOR GRADER >100 HP

E13

135.0

676,000,000

440,813.67

14

TRACK LOADER 75-100 HP

E14

70.0

0.8 M3

498,960,000

275,684.91

15

WHEEL LOADER 1.0-1.6 M3

E15

96.0

1.5 M3

429,000,000

309,926.83

16

THREE WHEEL ROLLER 6-8 T

E16

55.0

8.0 Ton

350,000,000

213,151.08

17

TANDEM ROLLER 6-8 T.

E17

82.0

8.1 Ton

450,000,000

287,721.97

18

TIRE ROLLER 8-10 T.

E18

100.5

9.0 Ton

900,000,000

425,015.96

19

VIBRATORY ROLLER 5-8 T.

E19

82.0

7.1 Ton

985,000,000

408,609.96

20

CONCRETE VIBRATOR

E20

5.5

21

STONE CRUSHER

E21

220.0

22

WATER PUMP 70-100 mm

E22

23

WATER TANKER 3000-4500 L.

E23

100.0

24

PEDESTRIAN ROLLER

E24

8.8

25

TAMPER

E25

4.7

26

JACK HAMMER

E26

0.0

1,330.00 -

35,000,000

36,099.04

27

FULVI MIXER

E27

345.0

2,005.00 -

159,500,000

929,326.56

28

CONCRETE PUMP

E28

100.0

8.00 M3

750,000,000

378,620.47

29

TRAILER 20 TON

E29

175.0

20.00 Ton

372,900,000

443,588.27

30

PILE DRIVER + HAMMER

E30

25.0

2.50 Ton

1,750,000,000

471,743.49

31

CRANE ON TRACK 35 TON

E31

125.0

35.0 Ton

1,500,000,000

584,675.46

32

WELDING SET

E32

40.0

250.0 Amp

17,500,000

109,144.76

33

BORE PILE MACHINE

E33

150.0

2,000.0 Meter

2,250,000,000

790,730.45

34

ASPHALT LIQUID MIXER

E34

5.0

35

TRONTON

E35

150.0

36

COLD MILLING

E36

248.0

37

ROCK DRILL BREAKER

E37

39

HOT RECYCLER

E39

400.0

40

AGGREGAT (CHIP) SPREADER

E40

115.0

41

ASPHALT DISTRIBUTOR

E41

115.0

42

SLIP FORM PAVER

E42

105.0

43

CONCRETE PAN MIXER

E43

134.0

44

CONCRETE BREAKER

E44

290.0

45

ASPAHLT TANKER

E45

190.0

46

CEMENT TANKER

E46

47

CONDRETE MIXER (350)

E47

48

VIBRATING RAMMER

49

6.0 -

3.0 -

60.0 T/Jam

5,000.0 CPM/(L/m)

10,800.0 -

25.0 -

14,784,000

48,963.77

1,500,000,000

803,652.59

19,800,000

45,446.87

4,000.0 Liter

165,000,000

257,973.69

835.00 Ton

150,000,000

88,360.73

121.00 Ton

29,000,000

54,508.76

60.0 T/Jam -

1,000.0 Liter 15.0 Ton 1,000.0 m -

15,000,000

41,553.65

276,000,000

485,356.73

3,400,000,000

1,299,898.24

770,000,000

272,313.13

3.0 M

29,250,000,000

7,433,534.94

3.5 M

395,000,000

533,540.47

395,000,000

364,866.85

3.0 M

1,430,742,857

880,670.66

600.0 Liter

1,000,000,000

645,798.67

900,000,000

815,851.07

4,000.0 liter

500,000,000

539,227.14

190.0

4,000.0 liter

500,000,000

499,227.14

20.0

350.0 liter

35,000,000

79,519.23

E48

4.2

80.0 KG

20,000,000

48,612.95

TRUK MIXER (AGITATOR)

E49

220.0

5.0 M3

600,000,000

587,265.80

50

BORE PILE MACHINE

E50

125.0

60.0 CM

1,350,000,000

694,314.25

51

CRANE ON TRACK 75-100 TON

E51

200.0

75.0 Ton

1,800,000,000

819,916.44

52

BLENDING EQUIPMENT

E52

50.0

30.0 Ton

500,000,000

283,680.76

53

ASPHALT LIQUID MIXER

E34a

40.0

15,000,000

108,928.65

54

BAR BENDER

E53

3.0

5.0 ton

15,000,000

40,198.87

55

BAR CUTTER

E54

3.0

5.0 ton

17,500,000

41,015.27

4,000.0 Liter

20.0 m3/jam

20,000.0 Liter

KET.

60

PILE DRIVER LEADER, 75 kw

E59

70.0

75.0 kw

100

162,940.48

DAFTAR BARANG YANG DIIMPOR Satker / PPK No. Paket Kontrak Nama Paket Pro/Kab/Kodya

NO

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

NAMA BARANG

SATUAN

VOLUME

HARGA

N I H I L Jumlah

-

Padang, 11 Februari 2019 Penawar, PT. CITRA PERMATA SULUNG

FARDI MUABAROK Direktur Utama

REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN) Pekerjaan

: Padang Sawah - Bts. Sumut (Bedeng Rapat)

Nilai Kontrak + PPn

:

Rp

Ppn 10 %

:

Rp

1,221,756,990.79

Nilai Fisik

:

Rp

10,995,812,917.11

Pph 3%

:

Rp

329,874,387.51

Biaya Pelaksanaanan

:

Rp

10,665,938,529.60

12,217,569,907.90

Nilai Gabungan Barang/Jasa (Rp)

TKDN Total

URAIAN PEKERJAAN

DN

1

LN

2

3

Barang/

Ribu

%

Rp

KDN

4

5

Jasa

Gabungan

6

7

Barang I. Material Langsung (Bahan Baku)

9,599,344,676.64

II. Peralatan (Barang jadi)

9,599,344.68

-

A. Sub Total Barang

-

9,599,344,676.64

-

9,599,344.68

100.00%

100.00%

90.00%

100.00%

90.00%

100.00%

Jasa III. Manajemen Proyek dan Perekayasaan

-

-

-

-

-

-

IV. Alat Kerja/Fasilitas Kerja

-

-

-

-

-

-

V. Konstruksi dan Fabrikasi

-

-

-

-

-

VI. Jasa Umum

1,066,593,852.96

B. Sub Total Jasa

1,066,593,852.96 10,665,938,529.60

C. Total Biaya (A+B)

100.00%

100.00%

10.00%

-

1,066,593.85

100.00%

100.00%

10.00%

-

10,665,938.53

100.00%

100.00%

100.00%

Padang, 11 Februari 2019 % TKDN Gabungan

=

Barang & Jasa

Biaya Gabungan (9C) – Biaya Gabungan LN (9B)

X 100%

Biaya Gabungan (9C) =

10,665,938.53 10,665,938.53

=

-

1,066,593.85

Penawar PT. CITRA PERMATA SULUNG

X 100% TTD

100% FARDI MUBAROK Direktur Utama

REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM Satker / PPK No. Paket Kontrak Nama Paket Prov/Kab/Kodya

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

Nilai Gabungan Barang/Jasa ( Rp ) Uraian Pekerjaan

1

KDN

KLN

2

3

BARANG I. Barang langsung ( Bahan Baku )

-

II. Peralatan ( Barang Jadi ) A. Sub Total Barang

-

-

JASA III. Manajemen Proyek dan Perekayasaan

-

IV. Alat Kerja / Fasilitas Kerja

-

V. Konstruksi dan Fabrikasi

Err:509

VI. Jasa Umum

-

B. Sub Total Jasa

Err:509

-

C. Total Biaya ( A + B )

Err:509

-

% TKDN Gabungan Barang & Jasa (9E)

=

=

=

KOMPONEN DALAM NEGERI ( TKDN )

Padang Sawah)

t (Padang Sawah)

AH – BTS. SUMUT

Err:509 Total Ribu

TKDN Barang/Jasa

( Rp ) 4

Gabungan

6

7

-

-

-

-

-

-

-

-

-

-

-

-

Err:509

Err:509

Err:509

-

-

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Biaya Gabungan - Biaya Gabungan LN Biaya Gabungan Err:509 Err:509

Err:509 %

X 100 %

-

X 100%

Padang, 06 Februari 2019 Pelaksana, PT. PRIMA MARINDO NUSANTARA

DESRIANTO, ST Direktur Utama

DAFTAR HARGA SATUAN PEKERJAAN Satker/PPK Nama Paket Pro/Kab/Kodya

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

No. Mata Pembayaran

Uraian

a

b

1.2 1.8.(1) Err:509

DIVISI 1. UMUM Mobilisasi Manajemen dan Keselamatan Lalu Lintas Err:509 DIVISI 2. DRAINASE

2.1.(1) 2.2.(1) Err:509 3.1.(1a) Err:509 3.2.(1a) 3.2.(2a)

Err:509 Err:509 6.1 (2)(a) 6.3(5a) Err:509 Err:509 6.3(6a) Err:509 Err:509 Err:509 Err:509 Err:509 7.1 (7) a 7.3 (1) 7.9.(1) 7.10.(3) a. 7.15.(1) Err:509 Err:509 Err:509 Err:509

Galian untuk Selokan Drainase dan Saluran Air Pasangan Batu dengan Mortar Err:509 DIVISI 3. PEKERJAAN TANAH Galian Biasa Err:509 Timbunan Biasa dari sumber galian Timbunan Pilihan dari sumber galian DIVISI 4. PEKERJAAN PREVENTIF DIVISI 5. PPERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN Err:509 DIVISI 6. PERKERASAN ASPAL Err:509 Lapis Perekat - Aspal Cair Laston Lapis Aus (AC-WC) Err:509 Err:509 Laston Lapis Antara (AC-BC) Err:509 Err:509 Err:509 Err:509 Err:509 DIVISI 7. STRUKTUR Beton mutu sedang fc’20 MPa Baja Tulangan Polos BjTP 280 Pasangan Batu Bronjong dengan kawat yang dilapisi galvanis Pembongkaran Pasangan Batu Err:509 DIVISI 8. REHABILITASI JEMBATAN Err:509 Err:509 Err:509

No. Mata Pembayaran

Uraian

a

b

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Uraian

No. Mata Pembayaran a 9.1.(1) 9.1.(2) 9.1.(4) a 9.1.(9)

b DIVISI 9. PEKERJAAN HARIAN Mandor Pekerja Biasa Dump Truck, kapasitas 3 - 4 m³ Loader Roda Karet 1.0 - 1.6 M3 Err:509

10.1(1) 10.1(3) 10.1(6) 10.1(9) 10.1(16) 10.1(22) Err:509 Err:509

Galian Tanah untuk saluran air dan lereng Pasangan Batu dengan Mortar Lapis Pondasi Aggregat Klas S Campuran Aspal Panas Pasangan Batu Pengendalian Tanaman pada Rumija Err:509 Err:509 Err:509

Padang, 06 Fe

PT. PRIMA MARIND

DESRIAN

KERJAAN

Satuan

c

Harga Satuan (Rupiah) e

LS LS Err:509

233,949,040.00 30,980,000.00 Err:509

M3 M3 Err:509

41,080.75 632,042.91 Err:509

M3 Err:509 M3 M3

37,671.06 Err:509 71,374.24 137,571.67

Err:509

Err:509

Err:509 Liter Ton Err:509 Err:509 Ton Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 12,696.37 1,282,164.67 Err:509 Err:509 1,230,164.84 Err:509 Err:509 Err:509 Err:509 Err:509

M3 Kg M3 M3 M3 Err:509

1,495,768.69 15,453.26 688,665.98 594,916.67 354,708.51 Err:509

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Satuan

c Err:509 Err:509 Err:509

Harga Satuan (Rupiah) e Err:509 Err:509 Err:509

Satuan

c

Harga Satuan (Rupiah) e

Jam Jam Jam Jam

19,040.48 13,860.00 304,898.21 340,919.51

M3 M3 M3 M3 M3 M²

37,671.06 632,042.91 364,251.36 2,832,808.30 688,665.98 651.81

Err:509 Err:509

Padang, 06 Februari 2019 Pelaksana, PT. PRIMA MARINDO NUSANTARA

DESRIANTO, ST Direktur Utama

Err:509 Err:509

DAFTAR PERSONIL INTI Satker / PPK

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

No. Paket Kontrak

: 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

Nama Paket

: PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

Prop / Kab / Kodya

: Sumatera Barat

NO

NAMA

1

MUSTIKA CANDRA. ST. MT

2

MASTAR. ST

3

AHMAD SARDON. ST

4

LIZA FITRI. ST

5

MANGAPPU NAINGGOLAN. ST

6

FIRDAUS. ST

7 8

JABATAN

PENDIDIKAN

KEAHLIAN

PENGALAMAN

KETERANGAN

General Superintendet

S2 Teknik Sipil

Teknik Jalan

8

SKA Ahli Teknik Jalan ( Madya )

Site Manager

S1 Teknik Sipil

Teknik Jalan

8

SKA Ahli Teknik Jalan ( Madya )

Manager Kendali Mutu

S1 Teknik Sipil

Managemen Mutu

10

SKA Ahli Teknik Jalan ( Madya )

Quality Engineer

S1 Teknik Sipil

Quality Engineer

8

SKA Ahli Teknik Jalan ( Madya )

Quantity Engineer

S1 Teknik Sipil

Quantity Engineer

8

SKA Ahli Teknik Jalan ( Madya )

Ahli K3

S1 Teknik Sipil

K3 Kontruksi

10

SKA Ahli K3 Konstruksi ( Madya )

HARRY SAPUTRO ,ST

Pelaksana

S1 Teknik Sipil

Pelasana Jalan

6

SKA Ahli Teknik Jalan ( Muda )

HARMEN FADLI. ST

Pelaksana

S1 Teknik Sipil

Pelasana Jalan

10

SKA Ahli Teknik Jalan ( Muda )

9

DIANATA. ST

Pelaksana

S1 Teknik Sipil

Pelaksana Jembatan

8

SKA Ahli Teknik Jembatan ( Madya )

10

ARDI AFNAL. ST

Pelaksana

S1 Teknik Sipil

Pelaksana Jembatan

6

SKA Ahli Teknik Jembatan ( Madya )

11

MERIA SAFITRI. A.Md

ADM Keungan

D3 Akutansu

ADM Keuangan

4

Ijajah + KTP

Padang, 11 Februari 2019 Penawar, PT. CITRA PERMATA SULUNG

FARDI MUBAROK Direktur Utama

DAFTAR PERALATAN Program Kegiatan Pekejaan Lokasi

No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 18 16 19 20 21 22 23 24 25 26 27

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

Jenis Alat Asphal Mixing Plant Asphal Finisher (Sensored ) Asphal Sprayer Tandem Roller 6-8 Ton Motor Greader Tyre Roller 8-10 Ton Pedestrian Roller Generator Set Stone Cruieser Vibrator Roller 5-8 Ton Wheal Loeder Water Tangker 3000-4500 lt Compresor Concrette Mixer Jack Hammer Dump Truck Dump Truck Concrette Van Mixer Excavator Concrette Vibrator Water Pump Concrette Cutter Crass Cutter Asphal Cutter Plate Tamper Water Jet Flad Bes truck With Crane

Kapasitas

Merk / Type

Tahun Pembua tan

Jumlah

Kondisi Alat

Lokasi Sekarang

60 Ton/Jam

LB-100

2015

1.00

Unit

Baik

Bawan

10 Ton /Jam 850 Liter 6-8 Ton > 100 HP 8-10 Ton 835 135 KVA 60 Ton/Jam 5-8 Ton 1,0-1,6 M3 3000-4500 Ltr 4000-6500 L/M 0,3-0,6 M3 1330 3,5 Ton 10 Ton 800 L 80-140 HP 25 70-100 mm

Mitshubishi Mitshubishi Sakai komatshu sakai junna Caterpilar 3406 B Haiyan Tonghuin Mc Bomag changlin izuzu PDS185 Hercules Bosch 16-30 Mitshubishi Mitshubishi Bona JW500 Hitachi Honda /GX 160 Kubota Mikasa MCD-214 Krisbow FCC-300EC Mikasa MT -80F Krisbow Izuzu

2015 2016 2016 2017 2017 2018 2016 2015 2016 2017 1996 2015 2016 2017 2012 2012 2017 2010-2012 2017 2017 2018 2017 2017 2017 2017 2009

1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 2.00 6.00 10.00 1.00 2.00 2.00 1.00 1.00 4.00 2.00 1.00 1.00 1.00

Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit

Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik

Bawan Bawan Bawan Bawan Bawan Bawan Bawan Bawan Bawan Bawan Bawan Bawan Bawan Bawan Lb Alung Lb Alung Bawan Bawan Bawan Bawan Bawan Bawan Bawan Bawan Bawan Bawan

-

Sewa / Milik

Keterangan

Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa Sewa

Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa SINAR MUTIARA Surat Perjanjian Sewa SINAR MUTIARA Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Surat Perjanjian Sewa AKBP Padang, 11 Februari 2019 Penawar, PT. CITRA PERMATA SULUNG

FARDI MUBAROK Direktur Utama

UJI MUTU / TEKNIS / FUNGSI Satker / PPK

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

No. Paket Kontrak

: 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah)

Nama Paket

: PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT

Pro/Kab/Kodya

: Sumatera Barat Spesifikasi Uji Mutu

No. Mata Pembayaran

Uraian Pekerjaan

Bahan

Alat

Mobilisasi

Tidak ada

Tidak ada

Manajemen dan Keselamatan Lalu Lintas

Tidak ada

Tidak ada

Keselamatan dan Kesehatan Kerja

Tidak ada

Tidak ada

DIVISI 1. UMUM 1.2 1.8.(1) 1.19

DIVISI 2. DRAINASE 2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

Tidak ada

Tidak ada

2.2.(1)

Pasangan Batu dengan Mortar

Ada

Tidak ada

Err:509

Err:509

Ada

Tidak ada Tidak ada

DIVISI 3. PEKERJAAN TANAH 3.1.(1a)

Galian Biasa

Tidak ada

Err:509

Err:509

Tidak ada

3.2.(1a)

Timbunan Biasa dari sumber galian

Ada

Tidak ada

3.2.(2a)

Timbunan Pilihan dari sumber galian

Ada

Tidak ada

Ada

Tidak ada

DIVISI 4. PEKERJAAN PREVENTIF DIVISI 5. PPERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN Err:509

Err:509

Err:509

Err:509

Ada

Tidak ada

6.1 (2)(a)

Lapis Perekat - Aspal Cair

Ada

Tidak ada

6.3(5a)

Laston Lapis Aus (AC-WC)

Ada

Tidak ada

Err:509

Err:509

Ada

Tidak ada

Err:509

Err:509

Ada

Tidak ada

6.3(6a)

Laston Lapis Antara (AC-BC)

Ada

Tidak ada

Err:509

Err:509

Ada

Tidak ada

Err:509

Err:509

Ada

Tidak ada

Err:509

Err:509

Ada

Tidak ada

Err:509

Err:509

Ada

Tidak ada

Err:509

Err:509

Ada

Tidak ada

DIVISI 6. PERKERASAN ASPAL

DIVISI 7. STRUKTUR 7.1 (7) a

Beton mutu sedang fc’20 MPa

Ada

Tidak ada

7.3 (1)

Baja Tulangan Polos BjTP 280

Ada

Tidak ada

7.9.(1)

Pasangan Batu

Ada

Tidak ada

Bronjong dengan kawat yang dilapisi galvanis

Ada

Tidak ada

7.10.(3) a. 7.15.(1)

Pembongkaran Pasangan Batu

Tidak ada

Tidak ada

Err:509

Err:509

Tidak ada

Tidak ada

DIVISI 8. REHABILITASI JEMBATAN Err:509

Err:509

Ada

Tidak ada

Err:509

Err:509

Ada

Tidak ada

Err:509

Err:509

Tidak ada

Tidak ada

Err:509

Err:509

Tidak ada

Tidak ada

Err:509

Err:509

Ada

Tidak ada

Err:509

Err:509

Ada

Tidak ada

DIVISI 9. PEKERJAAN HARIAN 9.1.(1)

Mandor

Tidak ada

Tidak ada

9.1.(2)

Pekerja Biasa

Tidak ada

Tidak ada

9.1.(4) a

Dump Truck, kapasitas 3 - 4 m³

Tidak ada

Tidak ada

9.1.(9)

Loader Roda Karet 1.0 - 1.6 M3

Tidak ada

Tidak ada

Tidak ada

Tidak ada

### 10.1(1)

Galian Tanah untuk saluran air dan lereng

Spesifikasi Uji Mutu

No. Mata Pembayaran

Uraian Pekerjaan

Bahan

Alat

10.1(3)

Pasangan Batu dengan Mortar

Ada

Tidak ada

10.1(6)

Lapis Pondasi Aggregat Klas S

Ada

Tidak ada

10.1(9)

Campuran Aspal Panas

Ada

Tidak ada

10.1(16)

Pasangan Batu

10.1(22)

Pengendalian Tanaman pada Rumija

Ada

Tidak ada

Tidak ada

Tidak ada

### Err:509

Err:509

Tidak ada

Tidak ada

Err:509

Err:509

Tidak ada

Tidak ada

Padang, 11 Februari 2019 Pelaksana, PT. CITRA PERMATA SULUNG

FARDI MUABAROK Direktur Utama

DAFTAR PEKERJAAN UTAMA Satker / PPK No. Paket Kontrak Nama Paket Pro/Kab/Kodya

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

URAIAN

NO.

PEMELIHARAAN RUTIN 1 2 3

Pengendalian Tanaman pada Rumija Err:509 Err:509 PEMELIHARAAN RUTIN KONDISI

1 2 3

Err:509 Beton mutu sedang fc’20 MPa Pasangan Batu dengan Mortar REHABILITASI MINOR

1 2 3

Err:509 Beton mutu sedang fc’20 MPa Err:509 REKONSTRUKSI

1 2 3 4 5

Err:509 Err:509 Err:509 Beton mutu sedang fc’20 MPa Err:509 PEMELIHARAAN RUTIN JEMBATAN

1 2

Err:509 Err:509

Padang, 06 Februari

PT. PRIMA MARINDO NU

MA

SATUAN

KET

M² Err:509 Err:509

Err:509 M3 M3

Ton M3 Ton

Err:509 Err:509 Err:509 M3 Err:509

Err:509 Err:509

Padang, 06 Februari 2019 Pelaksana, PT. PRIMA MARINDO NUSANTARA

DESRIANTO, ST Direktur Utama

DAFTAR PEKERJAAN PENUNJANG Satker / PPK No. Paket Kontrak Nama Paket Pro/Kab/Kodya

NO.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

URAIAN

Mobilisasi Manajemen dan Keselamatan Lalu Lintas Err:509 Galian untuk Selokan Drainase dan Saluran Air Err:509 Galian Biasa Err:509 Timbunan Biasa dari sumber galian Timbunan Pilihan dari sumber galian Err:509 Lapis Perekat - Aspal Cair Laston Lapis Aus (AC-WC) Err:509 Laston Lapis Antara (AC-BC) Err:509 Baja Tulangan Polos BjTP 280 Pasangan Batu Bronjong dengan kawat yang dilapisi galvanis Pembongkaran Pasangan Batu Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Mandor Pekerja Biasa Dump Truck, kapasitas 3 - 4 m³ Loader Roda Karet 1.0 - 1.6 M3 Galian Tanah untuk saluran air dan lereng Lapis Pondasi Aggregat Klas S Pasangan Batu

Padang, 06 Februari

PT. PRIMA MARINDO NU

NJANG

SATUAN

LS LS Err:509 M3 Err:509 M3 Err:509 M3 M3 Err:509 Liter Ton Err:509 Ton Err:509 Kg M3 M3 M3 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Jam Jam Jam Jam M3 M3 M3

Padang, 06 Februari 2019

KET

Pelaksana, PT. PRIMA MARINDO NUSANTARA

DESRIANTO, ST Direktur Utama

DAFTAR MATA PEMBAYARAN UTAMA Satker / PPK No. Paket Kontrak Nama Paket Pro/Kab/Kodya

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

URAIAN

NO. ITEM

6.3(5a)

Laston Lapis Aus (AC-WC)

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

JUMLAH MATA PEMBAYARAN UTAMA

ARAN UTAMA

SATUAN

BOBOT ( % )

Ton

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 Padang, 11 Februari 2019 Padang, 19 Januari 2017 Padang, 19 Januari 2017 Penawar, NABIL - SURYADO KSO

ALI AZWAR Representative KSO

DAFTAR MATA PEMBAYARAN PENUNJANG/LAINNYA Satker / PPK No. Paket Kontrak Nama Paket Pro/Kab/Kodya

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

URAIAN PEKERJAAN

NO.

1.2

Mobilisasi

1.8.(1)

Manajemen dan Keselamatan Lalu Lintas

Err:509

Err:509

6.1 (2)(a) 7.15.(1)

Lapis Perekat - Aspal Cair Pembongkaran Pasangan Batu

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

9.1.(1)

Mandor

9.1.(2)

Pekerja Biasa

Err:509

Err:509

9.1.(4) a

Dump Truck, kapasitas 3 - 4 m³

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

10.1(1)

Galian Tanah untuk saluran air dan lereng

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

JUMLAH MATA PEMBAYARAN PENUNJANG/LAINNYA

ENUNJANG/LAINNYA

SATUAN

BOBOT

LS

Err:509

LS

Err:509

Err:509

Err:509

Liter

Err:509

M3

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Jam

Err:509

Jam

Err:509

Err:509

Err:509

Jam

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

M3

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Padang, 19 Januari 2017 Penawar, NABIL - SURYADO KSO

ALI AZWAR Representative KSO

REKAPITULASI MATA PEMBAYARAN Satker / PPK No. Paket Kontrak Nama Paket Pro/Kab/Kodya

: PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : 02 PPK 1.4 Padang Sawah - Bts. Sumut (Padang Sawah) : PRESERVASI JALAN PADANG SAWAH – BTS. SUMUT : Sumatera Barat

No

JENIS MATA PEMBAYARAN

1

MATA PEMBAYARAN UTAMA

2

MATA PEMBAYARAN PENUNJANG

JUMLAH

EMBAYARAN

AYARAN

BOBOT

Err:509 Err:509

Err:509

Padang, 19 Januari 2017 Penawar, NABIL - SURYADO KSO

ALI AZWAR Representative KSO

Related Documents

Tanah Sawah
June 2020 13
Batas Pelajaran.docx
December 2019 40
Batas Ketaatan
November 2019 36
Kaninong Batas
November 2019 32

More Documents from ""