Cleaning In Place Lampiran.docx

  • Uploaded by: Wilianto Kurniawan
  • 0
  • 0
  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Cleaning In Place Lampiran.docx as PDF for free.

More details

  • Words: 2,386
  • Pages: 14
LAMPIRAN TUGAS KHUSUS KERJA PRAKTEK

EVALUASI KEBUTUHAN AIR UNTUK PROSES CLEANING IN PLACE PADA YOGHURT SECTION

DI PT GREENFIELDS INDONESIA MANUFACTURING UNIT (PALAAN) MALANG PERIODE 18 FEBRUARI – 15 MARET 2019

Disusun oleh : WILIANTO KURNIAWAN 15/385193/TK/43855

DEPARTEMEN TEKNIK KIMIA FAKULTAS TEKNIK UNIVERSITAS GADJAH MADA MARET 2019

LAMPIRAN

A. Lampiran Data Tabel I. Data CIP T11 pada 26 Februari 2019

Acid Rinse

Acid

Caustic Rinse

Caustic

Initial Rinse

Date Eq. Type

26 February 2019 T11 Dissolution Tank Timer No. Sample Set Point 1 2 639 s 3 4 5 Set Point 1 2 637s 3 4 5 Set Point 1 2 652 s 3 4 5 Set Point 1 2 661s 3 4 5 Set Point 1 2 327 s 3 4

Time (s) 600 0 120 240 360 480 600 0 120 240 360 480 600 0 120 240 360 480 600 0 120 240 360 480 300 0 120 240 290

Flowrate (L/h) 10000 10034 9970 10041 10123 9991 10000 10085 10047 10030 10213 10012 10000 9982 10031 10021 9983 10089 10000 10002 10002 10007 10010 10042 10000 9929 9981 10019 9948

Temperature Conductivity (C) (mS/cm) 40 2 42,2 0,3 43,8 0,4 43,9 0,4 42,4 0,3 41,3 0,4 80 5 82 50,4 81,1 48,7 81,5 44,9 80,2 47,2 81,3 48,8 30 2 30,8 1,5 31,2 0,5 31,3 0,4 30,9 0,3 30,1 0,3 65 4 66,4 43 66,2 40,9 66,8 40,2 66,9 38,4 66,4 38 30 2 30,1 1,9 29,7 0,5 30,1 0,3 30,1 0,3

Tabel II. Data CIP Discharge T103-T104-T105 pada 28 Februari 2019

Acid Rinse

Date Eq. Type

28 February 2019 Discharge T103-T104-T105 Fermentation Tank Timer No. Time (s) Flowrate Sample (L/h) Set Point 600 10000 1 175 9975 08:11:47 2 318 9874 3 416 10068 08:23:21 4 535 9910 5 592 10983

Temperature Conductivity (C) (mS/cm) 30 2 30,1 0,2 30 0,3 30,1 0,2 30 0,2 30,2 0,2

Tabel III. Data CIP T101 pada 28 Februari 2019

Caustic Rinse

Caustic

Initial Rinse

Date Eq. Type

28 February 2019 T101 Preparation Tank Timer No. Sample Set Point 1 08:25:54 2 08:31:21 3 4 Set Point 1 08:33:26 2 3 08:47:06 4 5 Set Point 1 08:49:02 2 3 08:55:34 4 5

Time (s) 300 0 120 179 242 600 20 77 117 188 278 300 20 53 149 232 278

Flowrate (L/h) 10000 9838 8333 9999 10013 10000 10016 9873 10648 10456 10231 10000 10903 9031 9992 11235 10341

Temperature Conductivity (C) (mS/cm) 35 2 36,8 0,3 37,9 0,3 39,4 0,3 41 0,4 75 5 77,1 48,1 76 56,1 75,2 54,2 75 52,6 76,5 49,1 30 2 40,1 1,2 39,2 0,9 35,2 0,4 32,4 0,3 31,4 0,3

Tabel IV. Data CIP T60 pada 28 Februari 2019

Caustic Rinse

Caustic

Initial Rinse

Date Eq. Type

28 February 2019 T60 Yogurt Storage Tank Timer No. Time (s) Sample Set Point 400 1 50 09:05:01 2 100 – 09:12:40 3 150 4 236 Set Point 600 1 116 09:14:23 2 154 – 3 216 09:25:25 4 313 5 507 Set Point 600 1 9 2 23 3 35 09:27:15 4 64 – 09:38:30 5 132 6 262 7 378 8 555

Flowrate (L/h) 10000 10636 10961 10231 10312 10000 9467 9850 9507 10016 9931 10000 9787 9903 10012 8423 12735 10039 9827 10010

Temperature Conductivity (C) (mS/cm) 40 2 40,9 0,4 40,2 0,3 40,3 0,3 40,1 0,3 75 5 76,5 43,8 75,9 46,3 76,7 52,8 75,8 50,3 76 58 30 2 31,4 1,7 31,3 0,6 31,3 0,2 31,1 0,5 30,3 0,2 29,9 0,3 29,9 0,3 30,2 0,2

Tabel V. Data CIP Serac Filler 60 pada 28 Februari 2019

Caust Initial Rinse ic

Date Eq. Type

28 February 2019 Serac Filler 60 Timer No. Sample Set Point 1 09:49:40 2 – 3 09:56:18 4 Set Point 1

Time (s) 300 23 47 65 120 600 32

Flowrate (L/h) 10000 7686 9133 10100 10532 10000 9403

Temperature Conductivity (C) (mS/cm) 40 2 40,5 1,2 40,1 0,4 39,8 0,3 40,3 0,4 75 5 77,2 62,7

Caustic Rinse

09:57:54 10:12:33

10:14:34 – 10:28:17

2 3 4 5 Set Point 1 2 3 4 5 6

73 106 413 503 600 8 15 28 26 118 143

9223 10575 872,6 11921 10000 10027 10001 10085 10010 10172 8373

77,4 76 76,4 76,5 30 30,1 30 30,1 29,6 30 29,7

57,8 55,2 56,9 54,2 2 1,1 0,8 0,4 0,3 0,5 0,3

Date Eq. Type

28 February 2019 T11 Dissolution Tank Timer No. Sample

Initial Rinse

11:08:01 – 11:17:22

Hot Water

Tabel VI. Data CIP T11 pada 28 Februari 2019

931 s

Set point 1 2 3 Set Point 1 2 3 4

Time (s) 500 19 182 376 900 100 300 500 700

Flowrate (L/h) 10000 9932 10024 10050 10000 9935 10086 10062 10529

Temperature Conductivity (C) (mS/cm) 40 2 36,8 0,2 37,6 0,3 38,4 0,2 90 2 99,7 0,2 98,9 0,2 98 0,2 99,1 0,2

Tabel VII. Data CIP Discharge T101-T111+PHE01 pada 28 Februari 2019

Caustic

Date Eq. Type

28 February 2019 Discharge T101-T111+PHE01 Timer No. Sample Time (s)

15:35:21 – 15:46:45

Set Point 1 2 3 4

600 89 123 359 512

Flowrate (L/h) 17000 17210 17103 17013 17034

Temperature Conductivity (C) (mS/cm) 75 5 76,9 60,2 77,3 60,4 77 60,5 77,2 60,4

Caustic Rinse

15:48:43 15:56:19

5 Set Point 1 2 3 4 5 6 7 8

568 300 10 16 20 48 91 110 173 218

17002 17000 17251 17453 16949 16784 16913 17000 16984 17451

77,1 30 49,9 48,3 47,9 44,7 44,6 37,5 33,5 31,2

60,5 2 1,5 1,3 1,1 0,4 0,3 0,3 0,3 0,3

Tabel VIII. Data CIP Discharge T101-T111+PHE01 pada 28 Februari 2019

Acid

Caustic Rinse

Date Eq. Type

1 March 2019 Discharge T103-T104-T105 Thermizer Timer No. Sample Time (s) Flowrate (L/h) Set Point 300 10000 1 20 10038 2 25 10070 3 34 10054 4 44 9989 5 60 9969 08:23:28 6 71 10014 08:28:31 7 76 10006 8 87 9960 9 240 9937 10 255 10074 11 262 10013 12 280 9864 Set Point 1200 10000 1 104 10352 2 190 10239 09:01:51 3 351 10340 – 4 447 10485 09:24:07 5 811 10378 6 941 10411 7 1060 10411

Temperature Conductivity (C) (mS/cm) 30 2 32,5 0,7 32,3 0,6 32,2 0,5 32,3 0,4 32,4 0,3 32,3 1 32,5 0,7 32,4 0,3 30,7 0,8 30,4 0,6 31 0,3 30,4 0,5 65 4 59,4 19,6 61 18,3 65,7 17,2 65,5 17,4 66 17,1 66 17,1 65,6 17

Acid Rinse

09:27:00 – 09:37:48

Set Point 1 2 3 4 5

600 80 121 228 321 412

10000 10012 10007 9949 9958 10654

30 30,6 30,6 30,5 30,4 30,6

2 0,2 0,5 0,3 0,3 0,4

Tabel VIII. Data CIP T60 pada 1 Maret 2019

Acid

1 March 2019 T60 Yogurt Storage Tank Timer No. Sample Time (s)

10:40:34 – 10:51:58

Acid Rinse

Date Eq. Type

10:53:01 – 11:04:09

Set Point 1 2 3 4 5 Set Point 1 2 3 4 5

600 20 70 130 165 354 600 20 40 71 106 232

Flowrate (L/h) 10000 10728 12310 10321 10468 9879 10000 9931 10999 8875 9987 10362

Temperature Conductivity (C) (mS/cm) 65 4 65,7 15,7 67,5 16 65,8 15,1 66,1 13,8 65,5 12,8 30 2 33,3 0,2 32,9 0,2 31,9 0,2 30,6 0,3 30,2 0,3

Tabel IX. Data CIP Serac Filler 60 pada 1 Maret 2019

Caust Initial Rinse ic

Date Eq. Type

1 March 2019 Serac Filler 60 Timer No. Sample Set Point 1 15:37:20 2 – 15:43:57 3 4 Set Point 1

Time (s) 300 23 42 133 179 600 25

Flowrate (L/h) 10000 8009 13074 9137 10155 10000 10031

Temperature Conductivity (C) (mS/cm) 40 2 40,3 0,5 36,8 0,4 39,8 0,4 38,4 0,3 75 5 78,7 61,2

Caustic Rinse

16:01:13 – 16:15:56

Acid

16:25:38 – 16:37:47

Acid Rinse

15:45:52 – 15:59:08

16:39:33 – 16:52:24

2 3 4 5 Set Point 1 2 3 4 5 Set Point 1 2 3 4 5 Set Point 1 2 3 4 5 6

37 42 55 557 600 13 25 43 69 309 600 94 138 227 334 478 600 10 32 63 124 200 369

10028 7595 9471 9983 10000 14259 10277 10025 9825 10681 10000 10137 9754 10006 8940 10648 10000 14367 10016 8124 9970 11422 14015

78,8 81,2 79 75 30 29,1 29,3 29,5 29,5 29,7 65 66,3 66,2 66 65,9 65,4 30 28,7 28,4 29 29,2 29,3 29,7

55,6 54,8 52,9 49,7 2 3,4 0,3 0,4 0,2 0,3 4 12 12,1 12,3 12,3 12,1 2 0,4 0,3 0,2 0,2 0,3 0,2

Tabel X. Data CIP T102 pada 4 Maret 2019

Caust ic

Initial Rinse

Date Eq. Type

4 March 2019 T102 Buffer Tank Timer No. Sample Set Point 1 2 09:05:20 3 09:11:26 4 5 6 09:23:24 Set Point 1

Time (s) 300 73 62 83 121 182 215 600 33

Flowrate (L/h) 8000 7768 9633 6337 8008 7974 8079 8000 8020

Temperature Conductivity (C) (mS/cm) 40 2 42 0,3 41,8 0,4 41,9 0,5 42,1 0,6 42,2 0,5 42,3 0,4 75 5 77,7 62,8

Caustic Rinse

09:34:26

09:42:17 09:58:50

2 3 4 5 6 Set Point 1 2 3 4 5 6 7 8 9 10

74 97 216 261 337 900 10 23 27 40 53 69 84 153 586 782

7700 7372 8020 9403 8839 8000 8003 8071 8020 12136 8902 8797 7068 7991 8020 7982

74,2 76,1 75,2 75 74,6 30 30,6 30,3 30,3 30,2 29,9 30 30,2 29,7 29,6 30

62,4 60,8 50,9 60 60,1 2 1,2 0,8 0,7 1,2 0,5 0,4 0,4 0,4 0,4 0,3

Tabel XI. Data CIP Filler T102 pada 4 Maret 2019

Caustic

Initial Rinse

Date Eq. Type

4 March 2019 Filler T102 Timer No. Sample Set Point 1 2 3 10:51:30 4 11:01:28 5 6 7 8 Set Point 1 2 11:04:27 3 11:14:27 4 5 6

Time (s) 600 55 76 105 143 182 232 311 380 600 5 15 22 25 50 64

Flowrate (L/h) 10000 11576 10149 10314 10230 9848 10627 10198 10468 10000 11399 9845 10116 10730 10596 10537

Temperature Conductivity (C) (mS/cm) 30 2 29,5 0,3 29,4 0,2 29,7 0,4 30 0,3 30 0,3 29,7 0,3 29,8 0,3 29,6 0,3 80 5 78,8 36,9 79 29,6 79 18,9 79 16,6 79,1 49,7 79,6 52,9

Caustic Rinse

11:19:10 11:30:40

Hot Water

11:32:14 11:48:49

7 8 9 Set Point 1 2 3 4 5 6 7 Set Point 1 2 3 4 5 6 7 8 9

103 123 575 600 5 27 83 94 157 179 546 900 50 63 108 200 239 277 441 579 775

11188 10808 10923 10000 10427 10715 10565 10535 9903 9622 10385 10000 11107 10048 10132 10047 10115 9851 9861 10049 10015

79,6 79,8 81,3 30 32,4 32,5 31,1 30,8 30,8 30,5 30,3 90 93,4 95,8 89,6 93,3 95,1 96,5 99,1 96,6 95,6

54,4 53,9 48,9 2 9,5 1,9 1,5 0,6 0,4 0,3 0,3 2 0,2 0,2 0,3 0,2 0,2 0,2 0,2 0,2 0,2

Tabel XI. Data CIP T105 pada 5 Maret 2019

Caustic

Initial Rinse

Date Eq. Type

5 March 2019 T105 Fermentation Tank Timer No. Time (s) Sample Set Point 300 1 70 2 136 08:23:20 3 150 08:30:25 4 175 5 234 6 282 Set Point 600 08:32:53 1 21 2 67 08:44:04 3 163

Flowrate (L/h) 10000 9789 8235 11899 9650 8275 10033 10000 9984 11257 8692

Temperature Conductivity (C) (mS/cm) 40 2 38,2 0,4 39 0,4 39,1 0,4 32,4 0,4 49,5 0,3 39,7 0,4 75 5 76,8 48,6 76,5 44,1 75,1 46,3

Caustic Rinse

08:46:33 08:53:21

4 5 6 7 Set Point 1 2 3 4 5 6 7 8

244 347 480 570 300 12 23 34 48 85 99 144 295

10396 9993 9906 10013 10000 9977 9960 9914 10772 9932 9966 10062 12172

74,6 75 75,2 75 30 59,6 59,7 59,6 59,5 51,4 51,4 45,3 37,6

50,4 44,8 50 38,5 2 0,8 0,7 0,6 0,5 0,3 0,2 0,2 0,3

Tabel XII. Data CIP T105 pada 5 Maret 2019

Initial Rinse

Date Eq. Type

5 March 2019 T105 Fermentation Tank Timer No. Time (s) Sample Set Point 300 1 41 09:51:03 2 99 3 139 09:57:35 4 177 5 258

Flowrate (L/h) 10000 10132 12314 11371 10473 11914

Temperature Conductivity (C) (mS/cm) 40 2 45,2 0,3 45,1 0,3 41 0,2 41,5 0,2 41,4 0,3

Tabel XIII. Data CIP T102 pada 6 Maret 2019

Caustic Rinse

Date Eq. Type

6 March 2019 T102 Buffer Tank Timer No. Sample Set Point 1 13:06:01 2 3 13:22:22 4 5

Time (s) 900 103 301 580 803 857

Flowrate (L/h) 8000 7840 8310 7974 8000 8025

Temperature Conductivity (C) (mS/cm) 30 2 29,3 0,3 29,9 0,4 29,7 0,3 29,6 0,3 29,5 0,3

Acid

13:37:41 13:48:50

Acid Rinse

13:56:17 14:07:21

Set Point 1 2 3 4 5 6 Set Point 1 2 3 4 5

600 15 31 51 114 218 230 600 10 30 146 231 452

8000 8029 7994 8727 7865 8000 7979 8000 7981 7996 7967 8021 7931

B. Lampiran Perhitungan 1. Kebutuhan Air Proses Cleaning in Place Kebutuhan air dihitung dengan persamaan; 𝐹𝑥𝑡

V = 3600 Dengan; V

= volume air yang dibutuhkan, L

F

= flowrate air yang terbaca pada flowmeter, L/h

t

= waktu pembersihan, s

65 70,3 69,4 67,7 66,3 66 66,2 30 30 30,1 29,9 30 30,1

4 9,9 11,3 10,8 10 7,6 9,6 2 0,3 0,2 0,3 0,3 0,3

Tabel XIV. Kebutuhan Air untuk Proses Cleaning in Place Date

Equipment/Line

26/02/2019 28/02/2019 28/02/2019 28/02/2019 28/02/2019 28/02/2019 28/02/2019 01/03/2019 01/03/2019 01/03/2019 04/03/2019 04/03/2019 05/03/2019 05/03/2019 06/03/2019

T11 Discharge T103-T104-T105 T101 T60 Serac Filler 60 T11 Discharge T101-T111+PHE01 Discharge T103-T104-T105 T60 Serac Filler 60 T102 Filler T102 T105 T105 T102

Note : n/a data not applicable

Initial Rinse

Caustic

1780 0 867 1343 1035 1309 0 0 0 906 810 1810 1139 1201 0

1783 0 2334 1794 2051 n/a 3244 0 0 2083 1513 1810 1870 n/a 0

Kebutuhan Air (Liter) Caustic Acid Rinse 1815 1838 0 0 1122 n/a 1892 n/a 2235 n/a n/a n/a 2166 n/a 842 3850 0 2041 2484 2004 2344 n/a 1976 n/a 1172 n/a n/a n/a 2188 1505

Acid Rinse

Hot Water

906 1959 n/a n/a n/a n/a n/a 1821 1861 2424 n/a n/a n/a n/a 1472

n/a n/a n/a n/a n/a 2626 n/a n/a n/a n/a n/a 2802 n/a n/a n/a

C. P&ID Yoghurt Section

Related Documents


More Documents from "Angel"