CALIBRATION OPENING GATE OF COLD BIN
WATER CONTENT: 3,71 DURATION : 1 Minit
Material No. Cold
No
OPENING GATE ( Cm )
WEIGHT OF WET MATERIALS ( Kg )
WEIGHT OF DRY MATERIALS ( Kg )
DEBIT MATERIALS ( Kg / mnt )
1 2 3 4
5 10 15 20
63,0 98,5 114,2 138,0
59,29 94,79 110,49 134,29
59,29 94,79 110,49 134,29
Debit Materials
: :
0 - 5 mm Cold Bin III
REMARKS
: 107,3 DEBIT MATERIAL CURVE COLD BIN
250 200 Debit Mtr (Kg/ Mnt )
150 100 50 0 5
Opening Gate
10
15 20 25 OPENING GATE ( Cm )
30
35
: 15 Cm Kontraktor
Konsultan
Bina Marga/PU
40
N OPENING GATE OF COLD BIN
Konsultan
PEMERINTAH PROP. SUMATERA BARAT
Pembangunan Jalan Pantai Purus Cs
DINAS PRASARAN JALAN Jln. Arau No. 86 Telp. ( 0751 ) 21108 Padang
Kalibrasi Opening Gate Of Cold Bin
Kontraktor
PT. L M K P - MRM KSO
Water Content Duration
Tanggal Test
:
Jns Pekerjaan
:
Jns Material
: Hot Mix AC - BC
Lokasi
:
3.7 1 menit
Material : 5 - 0 mm No. Cold Bin : Cold Bin I
Open Gate ( mm )
Weigth of Wet Materials ( kg )
Weigth Of Dry Materials ( kg )
Debit Material ( kg / mnt )
1 2 3
5 10 15
256.1 296.4 381.3
252.40 292.70 377.60
252.4 292.7 377.6
4
20
462.4
458.70
458.7
D e b i t M a t e r i a l ( k g /m n t )
No.
Debit Material
Des 2008
: 377.6
Remarks
kg/mnt
DEBIT MATERIAL CURVE COLD BIN 500 400 300 200 100 0
4
5
6
Approved By, Bina Marga
7
8
9
10
11 12 13 14 15 Opening Gate ( cm )
Checked By, Konsultan
16
17
18
19
Tested By, Kontraktor
20
21
Tgl
Tgl
Tgl
: 5 - 0 mm : Cold Bin I
Konsultan
PEMERINTAH PROP. SUMATERA BARAT
Pembangunan Jalan Pantai Purus Cs
DINAS PRASARAN JALAN Jln. Arau No. 86 Telp. ( 0751 ) 21108 Padang
Kalibrasi Opening Gate Of Cold Bin
Kontraktor
PT. L M K P - MRM KSO
Water Content Duration
Tanggal Test
:
Jns Pekerjaan
:
Jns Material
: Hot Mix AC - BC
Lokasi
:
2.5 1 menit
Material : 13 - 5 mm No. Cold Bin : Cold Bin II
Open Gate ( mm )
Weigth of Wet Materials ( kg )
Weigth Of Dry Materials ( kg )
Debit Material ( kg / mnt )
1 2 3
5 10 15
174.2 224.9 256.7
171.70 222.40 254.20
171.7 222.4 254.2
4
20
289.4
286.90
286.9
D e b i t M a t e r i a l ( k g /m n t )
No.
Debit Material
Des 2008
: 241.6
Remarks
kg/mnt
DEBIT MATERIAL CURVE COLD BIN 350 300 250 200 150 100 50 0
4
5
6
Approved By, Bina Marga
7
8
9
10
11 12 13 14 15 Opening Gate ( cm )
Checked By, Konsultan
16
17
18
19
Tested By, Kontraktor
20
21
Tgl
Tgl
Tgl
: 13 - 5 mm : Cold Bin II
Konsultan
PEMERINTAH PROP. SUMATERA BARAT
Pembangunan Jalan Pantai Purus Cs
DINAS PRASARAN JALAN Jln. Arau No. 86 Telp. ( 0751 ) 21108 Padang
Kalibrasi Opening Gate Of Cold Bin
Kontraktor
PT. L M K P - MRM KSO
Water Content Duration
Tanggal Test
:
Jns Pekerjaan
:
Jns Material
: Hot Mix AC - BC
Lokasi
:
1.18 1 menit
Material : 19 - 13 mm No. Cold Bin : Cold Bin III
Open Gate ( mm )
Weigth of Wet Materials ( kg )
Weigth Of Dry Materials ( kg )
Debit Material ( kg / mnt )
1 2 3
5 10 15
106.8 148.7 164.8
105.62 147.52 163.62
105.62 147.52 163.62
4
20
172.4
171.22
171.22
D e b it M a t e r ia l ( k g /m n t )
No.
Debit Material
Des 2008
: 136.8
Remarks
kg/mnt
DEBIT MATERIAL CURVE COLD BIN
200 150 100 50 0
4
5
6
Approved By, Bina Marga
7
8
9
10
11 12 13 14 15 Opening Gate ( cm )
Checked By, Konsultan
16
17
18
19
Tested By, Kontraktor
20
21
Tgl
Tgl
Tgl
: 19 - 13 mm : Cold Bin III