Cisterbna Ceba (1).docx

  • Uploaded by: Milu Millones
  • 0
  • 0
  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Cisterbna Ceba (1).docx as PDF for free.

More details

  • Words: 100
  • Pages: 1
ESTRUCTURAS METALICAS MILLONES TEC. DAVID MILLONES CHIROQUE

PRESUPUESTO

1- PRESUPUESTO CERCO DE MALLA DE SISTERNA CEBA: MATERIALES: -

Tubo galvanizado de 3´x 2.5 mm Malla Galvanizada de 2´ x 2´ Angulos de 1 1/2 ´ x 1/8´ Platina de 1/8´ x ¾´ Cerradura chapa travex 333 Acabado pintura Epóxica

PRECIO A TODO COSTO : s/ 1550.00

2- PRESUPUESTO TAPA METÁLICA DE CISTERNA: MATERIALES: -

Plancha Negra de 3/16´ Angulos 1/8´ x 1´ Tee 1/8´ x 1¨ Tubo cuadrado 1 ½´ x 1.5 mm Bisagras de 4´ x ½´ Platinas 1/8´ x 1´

PRECIO A TODO COSTO s/ 400.00

RPM #972832432

Related Documents

Cisterbna Ceba (1).docx
December 2019 32
Ceba 1173 Jct
November 2019 46
Ceba - Lista 8 - Ma 2008
November 2019 25

More Documents from ""