LABORATORIUM PENGUJIAN TANAH JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI UJUNG PANDANG

KESIMPULAN HASIL PEMERIKSAAN LABORATORIUM Dari pemeriksaan yang telah dilakukan di laboratorium pada sampel tanah yang dibawa oleh PT. Swaka Karya (Persero) dari Quarry Pakatto, diperoleh hasil pengujian Laboratorium sebagai berikut : No 1 2 3 4

5

6

Nama Pengujian Kadar Air Berat Jenis Batas Cair Batas Plastis Indeks Plastis Analisa Saringan: Lolos # no. 200 Pemadatan Lab: ɣd max W opt CBR lab: 0,1 " 0,2"

Hasil Pengujian 35.17 2.31 54.45 27.73 26.72

Satuan %

36.70

%

1.29 23.30 26.062 21.02

gr/cm3 % % %

% % %

Makassar, 10 maret 2019 Kepala Lab Pengujian Tanah,

Zulkifli, S.ST., M.T. Nip. 412 16 011

LABORATORIUM PENGUJIAN TANAH JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI UJUNG PANDANG

PENGUJIAN KADAR AIR (W)

Proyek

: Pembangunan Bendung Bakaru

Pelaksana

: PT. Swaka Karya (Persero) Tbk.

Quarry

: Pakatto Nomor Cawan Berat cawan + tanah basah Berat cawan + tanah kering Berat air Berat cawan kosong Berat tanah kering Kadar air kadar air rata-rata

(gram) (gram) (gram) (gram) (gram) (%) (%)

I II 101.522 99.729 78.598 77.767 22.924 21.962 13.545 15.183 65.053 62.584 35.239 35.092 35.17

LABORATORIUM PENGUJIAN TANAH JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI UJUNG PANDANG

PENGUJIAN BERAT JENIS (Gs)

Proyek

: Pembangunan Bendung Bakaru

Pelaksana

: PT. Swaka Karya (Persero) Tbk.

Quarry

: Pakatto Nomor Piknometer Berat piknometer kosong Berat piknometer + tanah Berat piknometer + tanah+air Berat piknometer + air Faktor koreksi suhu Berat Jenis

(gram) (gram) (gram) (gram) (T=28o C)

I 48.310 70.988 162.048 149.162 0.999 2.31

LABORATORIUM PENGUJIAN TANAH JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI UJUNG PANDANG

PENGUJIAN BATAS CAIR & BATAS PLASTIS Proyek

: Pembangunan Bendung Bakaru

Pelaksana

: PT. Swaka Karya (Persero) Tbk.

Quarry

: Pakatto

Banyaknya Ketukan Nomor Cawan Berat cawan + tanah basah Berat cawan + tanah kering Berat air Berat cawan kosong Berat tanah kering Kadar air

11 41 gr 37.669 gr 28.844 gr 8.825 gr 13.586 gr 15.258 % 57.84 rata - rata

Batas Cair 28 35 23 15 54.995 47.805 40.233 36 14.762 11.896 13.47 13.396 26.763 22.513 55.16 52.84

45 35 37.067 28.979 8.088 13.185 15.794 51.21

Batas Plastis I 27.487 23.924 3.563 9.845 14.079 25.31 27.73

IV 30.793 25.835 4.958 9.387 16.448 30.14 %

LABORATORIUM PENGUJIAN TANAH JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI UJUNG PANDANG

ANALISA SARINGAN Proyek

: Pembangunan Bendung Bakaru

Pelaksana

: PT. Swaka Karya (Persero) Tbk.

Quarry

: Pakatto

Diameter No. Saringan 1/2 " 3/4" 4 10 40 200 Pan

(mm) 25.4 19.1 4.75 2 0.425 0.075 0 Total

Berat % Komulatif tanah % Tertahan Tertahan Lolos tertahan 10.8 2.94872495 2.9487249 97.0513 12.9 3.522 6.471 93.529 16.53 4.513 10.984 89.016 30.22 8.251 19.235 80.765 60.76 16.589 35.824 64.176 100.65 27.480 63.305 36.695 134.4 36.695 100.000 0.000 366.26 100.00

100 90 80

PERSEN LOLOS

70 60 50 40 30 20 10 0 0.001

0.01

0.1

1

UKURAN SARINGAN (mm)

10

100

LABORATORIUM PENGUJIAN TANAH JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI UJUNG PANDANG

PERCOBAAN PEMADATAN (COMPACTION TEST) Proyek

: Pembangunan Bendung Bakaru

Pelaksana

: PT. Swaka Karya (Persero) Tbk.

Quarry

: Pakatto

Berat tanah + mold Berat mold Berat tanah basah

gram

Volume mold

cm3

Berat isi tanah basah Berat isi tanag kering (ɣd)

5280 3940 1420

5360 3940 1550 1550

5490 3940

938.33 938.33 938.33 938.33

5490 3940 1560 938.33

gr/cm3

1.43

1.51

1.65

1.65

1.66

gr/cm3

1.19

1.25

1.32

1.31

1.30

1

2

3

4

5

Nomor cawan Berat tanah basah + cawan gram Berat tanah kering + cawan gram Berat air gram Berat cawan kosong gram Berat tanah kering gram Kadar Air % Diameter mold = 10,10 cm Tinggi Mold

gram gram 1340

= 11,70 cm

39.262 43.636 52.011 61.521

42.343

35.02 38.336 44.73 51.52 35.901 4.242 5.3 7.281 10.001 6.442 13.319 13.183 15.434 13.395 13.148 21.701 25.153 29.296 38.125 22.753 19.55 21.07 24.85 26.23 28.31 ɣd max = 1,292 gr/cm3 w opt

= 23,30 %

5500 3940

LABORATORIUM PENGUJIAN TANAH JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI UJUNG PANDANG

PEMERIKSAAN CBR LAB. Proyek

: Pembangunan Bendung Bakaru

Pelaksana

: PT. Swaka Karya (Persero) Tbk.

Quarry

: Pakatto

Berat Mold + Tanah basah Berat Mold Berat tanah basah

9600 6000 3600

gram gram gram

2134.604

cm3

Berat isi basah

1.69

gram/cm3

Berat isi kering Penetrasi :

1.34

gram/cm3

Isi mold

WAKTU PENURUNAN (menit) (Inchi) 0 0

Pembacaan Arloji 0

Beban (lb) 0

0.25

0.0125

111

283.85

0.5

0.025

173

443.83

1 1.5 2 3 4 5 8 10 Kadar Air:

0.05 0.075 0.1 0.15 0.2 0.3 0.4 0.5

243 279 304 340.5 367.5 401.5 425.5

624.46 717.35 781.86 876.05 945.72 1033.45 1095.38

Tanah basah + cawan Tanah kering + cawan Berat cawan

85.886 71.558 15.374

gram gram gram

Kadar Air

25.50 CBR %

0,1" (781.86/3000)*100 = 26,062

0,2" (945,72/4500)*100 = 21,02

LABORATORIUM PENGUJIAN TANAH JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI UJUNG PANDANG

LABORATORIUM PENGUJIAN TANAH JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI UJUNG PANDANG