1 No. Lokasi
Sampel
2
3
Berat Sampel
Bikar (g)
Berat Bikar + Berat Sampel (g)
Berat Bersih Sampel (g)
4
5
Sampel Pipet
Berat Sampel Sebelum diayak
C
6
7 2
(g)
Berat Sampel Selepas Diayak (g)
mm
14.66
14.92
0.29
13.77
13.65
0.01
12.62
12.66
0.19
1.81
1.8
0.02
16.6
15.94
0.02
ZC (3) C – 2-Jan
0.02 (3) ZC – (3) C
STESEN 1
O
STESEN 1
A
STESEN 1
B
STESEN 2
S
STESEN 3
M
C
32.38
32.47
0.09
0.07
ZC
33.6
33.76
0.16
0.08
C
31.74
31.84
0.1
0.08
ZC
32.35
32.56
0.22
0.11
C
33.18
33.32
0.14
0.12
ZC
31.89
32.15
0.26
0.12
C
33.04
33.27
0.23
0.21
ZC
32.58
32.96
0.39
0.15
C
30.03
30.1
0.07
0.05
ZC
32.22
32.35
0.13
0.06
8
9
10
11
12
13
14
15
1
0.5
0.25
0.13
0.06
ZC
C
Jumlah
mm
mm
mm
mm
mm
(Lodak)
(Lempung)
8 – 14
16
17
Lodak (%)
Lempung (%)
7 – 14 8 – 14 (4) ZC X 50
(4) C X 50
0.19
2.66
5.37
3.52
2.88
3.85
3.35
21.93
18.2
15.3
0.08
1.49
4.31
3.87
3.9
5.65
4.2
23.49
24.1
17.9
0.06
1.32
4.03
3.64
3.44
6.2
6
21.4
29
28
0.02
0.07
0.12
0.15
1.42
7.7
10.6
20.09
38.3
52.8
0.22
1.07
3.76
8.46
2.41
3.05
2.45
23.87
10.3
12.8
18
19
Pasir (%)
Pengelasan Tekstur Tanah
66.5
Lom Berpasir
58
Lom Berpasir
43
Lom Lempung
8.9
Lom Lempung
76.9
Lom Berpasir