DAFTAR ANALISA KECAMATAN NGANJUK

ANALISA 1

A1

JENIS ANALISA SATUAN 2

ORANG/BAHAN 3

HARGA SATUAN ( RP ) 4

1 m3 Galian Tanah Biasa 0.75 Pekerja 0.025 Mandor

20,000.00 33,000.00 Jumlah

A2

1 m3 Galian Tanah Keras 1 Pekerja 0.033 Mandor

20,000.00 33,000.00 Jumlah

A9

1 m3 Mengangkut tanah dari lubang galian yang dalamnya lebih dari 1 m 0.15 0.8075

Pekerja Mandor

20,000.00 33,000.00 Jumlah

A14

1 m3 Urugan tanah dengan membilas Bahan 1.2 m3 Tanah urug

31,500.00

Upah 0.25 0.01

Pekerja Mandor

20,000.00 33,000.00 Jumlah

DPUTL-7

Biaya menggilas Upah 30 30 30 150

satu bulan Masinis Kernet Penjaga Pekerja

32,000.00 20,000.00 20,000.00 20,000.00

Bahan 1000 ltr Solar 20 ltr Minyak pelumas 5 Kg gemuk Biaya pemeliharaan satu bulan

1,650.00 13,000.00 1,300.00 2,100,000.00

Jumlah DPUTL-7

100 m2 Mengaspal secara penetrasi tebal 6 cm Bahan 700 kg aspal AC 6 m3 Batu pecah 2/3-3/5 2 m3 batu pecah 1/2 2 m3 grosok sawur 0.69 m3 kayu bakar

3,000.00 57,700.00 68,200.00 48,300.00 300,000.00

Upah 9 18 0.9 Penggilasan 2/75

DPUTL-7

Tukang masak aspal 30,000.00 Pekerja 20,000.00 Mandor 33,000.00 dari biaya menggilas satu bulan(DPUTL-7) Jumlah Biaya 1 m2

100 m2 Mengaspal secara penetrasi tebal 4 cm Bahan 500 kg aspal AC 4 m3 Batu pecah 3/5 1.4 m3 batu pecah 1/2 1.4 m3 grosok sawur 0.5 m3 kayu bakar

3,000.00 57,700.00 68,200.00 48,300.00 300,000.00

Upah 6 12 0.6 Penggilasan 2/75

W1

Tukang masak aspal 30,000.00 Pekerja 20,000.00 Mandor 33,000.00 dari biaya menggilas satu bulan(DPUTL-7) Jumlah Biaya 1 m2

1 m3 Urugan Sirtu dibawah alas jalan Bahan 1.2 m3 Sirtu

40,900.00

Upah 0.375 0.0199

Pekerja Mandor

20,000.00 33,000.00 Jumlah

W2.a

W2.b

W3

W7

1 m2 Pasang onderlaag tebal padat 15 cm Bahan 0.2 m3 Batu belah 0.05 m3 Pasir urug Upah 0.375 Pekerja 0.019 Mandor Penggilasan 1/7500 dari biaya menggilas satu bulan (DPUTL-7) Jumlah 1 m2 Pasang onderlaag tebal padat 20 cm Bahan 0.25 m3 Batu belah 15/20 0.05 m3 Pasir urug Upah 0.375 Pekerja 0.019 Mandor Penggilasan 1/7500 dari biaya menggilas satu bulan (DPUTL-7) Jumlah 100 m2 Pasang slytlaag tebal 6 cm padat Bahan 8 m3 Batu pecah 5/7 2 m3 Pasir Upah 7.5 Pekerja 0.375 Mandor Penggilasan 2/75 dari biaya menggilas satu bulan (DPUTL-7) Jumlah Biaya 1

100 m2 Mengaspal secara overpaint Bahan 150 kg aspal AC 1.2 m3 Split/grosok 0.25 m3 kayu bakar Upah

47,600.00 32,500.00 20,000.00 33,000.00

47,600.00 32,500.00 20,000.00 33,000.00

54,600.00 45,100.00 20,000.00 33,000.00

m2

3,000.00 48,300.00 300,000.00

0.3 Tukang masak aspal 8 Pekerja 0.4 Mandor Penggilasan 1/750 dari biaya menggilas satu bulan(DPUTL-7)

30,000.00 20,000.00 33,000.00

Jumlah Biaya 1 m2 A1+G2

1 m' Pasang batu tepi Bahan 0.036 m3 Batu belah

47,600.00

Upah 0.75 0.025 1.5 0.075

Pekerja Mandor Pekerja Mandor

pasang per m'

G32.h

20,000.00 33,000.00 20,000.00 33,000.00 Jumlah 1 Upah = 1/30 * Jumlah 1 bahan Jumlah

1 m3 Pasangan Batu Kali camp. 1 PC : 4 Psr Bahan 1.2 m3 batu kali 3.26 zak PC 0.522 m3 pasir

47,600.00 30,500.00 45,100.00

Upah 1.2 0.12 3.6 0.18

Tukang batu Kepala tukang Pekerja Mandor

30,000.00 32,000.00 20,000.00 33,000.00 Jumlah

G2

1 m3 Pasangan batu kosongan Bahan 1.2 m3 batu

47,600.00

Upah 1.5 0.075

Pekerja Mandor

20,000.00 33,000.00 Jumlah

G51 c

1 m2 Siaran 1 PC : 2 Psr Bahan 0.105 zak PC 0.0085 m3 pasir

30,500.00 45,100.00

Upah 0.12 0.012 0.36 0.018

Tukang batu Kepala tukang Pekerja Mandor

30,000.00 32,000.00 20,000.00 33,000.00 Jumlah

G51h

1 m2 Plesteran camp. 1 PC : 2 Psr tebal 10 mm Bahan 0.14 zak PC 0.0114 m3 pasir

30,500.00 45,100.00

Upah 0.15 0.015 0.4 0.02

Tukang batu Kepala tukang Pekerja Mandor

30,000.00 32,000.00 20,000.00 33,000.00 Jumlah

G43

1 m3 Cyclopen beton camp. 1 : 2 1/2 : 5 ( untuk lantaikerja pondasi langsung, khususnya dibawah air) Bahan 1 m3 Batu pecah 63,000.00 5 zak PC 30,500.00 0.5 m3 pasir 45,100.00 Upah 0.5 0.05 6 0.3

Tukang batu Kepala tukang Pekerja Mandor

30,000.00 32,000.00 20,000.00 33,000.00 Jumlah

G44

1 m3 Cyclopen beton camp. 1 : 3 : 6 ( untuk lantaikerja pondasi langsung, khususnya diatas air) Bahan 1 m3 Batu pecah 63,000.00 4.24 zak PC 30,500.00 0.5 m3 pasir 45,100.00 Upah 0.5 0.05 6 0.3

Tukang batu Kepala tukang Pekerja Mandor

30,000.00 32,000.00 20,000.00 33,000.00 Jumlah

Supl.V

1 m3 Pekerjaan beton bertulang camp. 1PC : 2 Psr : 3 Krl 1. Beton cor camp 1 PC : 2 Psr : 3 Krl Bahan 0.82 m3 Batu pecah 63,000.00 6.8 zak PC 30,500.00 0.54 m3 pasir 45,100.00

Upah 1 0.1 6 0.3

Tukang batu Kepala tukang Pekerja Mandor

30,000.00 32,000.00 20,000.00 33,000.00 Jumlah

2. 100 Kg Memasang + memotong besi beton Bahan 110 Kg Besi beton 2 Kg Kawat ikat

5,500.00 7,000.00 Jumlah bahan

Upah 9 3 9

Tukang besi Kepala tukang Pekerja

30,000.00 32,000.00 20,000.00 Jumlah upah

diambil 3/4 x upah Jumlah Untuk beton tulangan praktis diperlukan 125 kg besi/m3 beton 1.25 x 1,028,500.00 Untuk beton konstruksi diperlukan 160 kg besi/m3 beton 1.6 x 1,028,500.00 3. Bekisting Bahan / m3 beton 0.4 m3 kayu 4 kg paku

900,000.00 7,500.00 Jumlah bahan

Upah 0.5 0.05 0.2 0.01

Tukang kayu Kepala tukang Pekerja Mandor

Diperlukan 10 m 2 bekisting = 10 x

4. Membongkar cetakan + menyiram beton 4 pekerja 1 2 3 4 5 SPL II

Beton Beton Beton Beton Beton

30,000.00 32,000.00 20,000.00 33,000.00 Jumlah upah 20,930.00 Jumlah

20,000.00

tidak bertulang tanpa cetakan bertulang praktis dengan cetakan bertulang konstruksi dengan cetakan bertulang kontruksi tanpa cetakan bertulang praktis tanpa cetakan

Pasang Batu Muka 1 m 3 batu muka Bahan 1.2 m3 batu kali 3.26 zak PC 0.522 m3 pasir

47,600.00 30,500.00 45,100.00 Jumlah bahan

Upah 1.2 0.12 3.6 0.18

Tukang batu Kepala tukang Pekerja Mandor

30,000.00 32,000.00 20,000.00 33,000.00 Jumlah upah Upah 1 1/4 1 m3 Batu muka 1 m2 Batu muka (10 cm)

F9

1 m2 Pasang Deckplank Tahun Upah 0.75 Tukang Kayu 0.075 Kepala Tk. Kayu 0.25 Pekerja 0.012 Mandor 1.2 Upah Gergaji

30,000.00 32,000.00 20,000.00 33,000.00 6,875.00 Jumlah upah

Bahan 0.08 m3 Kayu Kamper 8 stel Dek Baut

2,750,000.00 13,000.00 Jumlah bahan Jumlah

H8

1 m2 Pasang seng Penutup Celah Upah 0.2 Tukang Kayu 0.02 Kepala Tukang Kayu 0.1 Pekerja 0.005 Mandor

30,000.00 32,000.00 20,000.00 33,000.00 Jumlah upah

Bahan 1 m2 Seng 0.05 kg Paku

28,750.00 7,500.00 Jumlah bahan Jumlah

G5b

3 m3 Membuat bronjong diisi dengan batu belah Membuat Bronjong 45 Kg Kawat ( 4mm ) Upah

7,500.00

2.2 Penganyam 1.8 Pekerja 0.08 Mandor

20,000.00 20,000.00 33,000.00 Jumlah upah

Memasang dan Mengisi Bahan 3.6 m3 batu belah 0.75 m3 Batu Pecah 5/7 Upah 4.5 Pekerja 0.075 Mandor

Jadi 1 m3

47,600.00 54,600.00 20,000.00 33,000.00

membuat dan memasang bronjong :

Memotong dan memasang besi tiap 100 kg Upah 9 Tukang besi 3 Kep. Tukang besi 9 Pekerja

30,000.00 32,000.00 20,000.00 Jumlah Upah Upah per kg = 1/100 x Jumlah

Bahan 110 Kg Besi

6,000.00 Bahan per kg

Mengelas 0.5 Tukang besi 2 Pekerja

30,000.00 20,000.00 Jumlah Upah diambil 3/4 x jumlah Upah per kg = 1/100 x upah mengelas Jumlah

K210

900 m 2 Pengupasan dan pembersihan semak pada damija

Upah 1 36

Mandor Pekerja

33,000.00 20,000.00

Alat bantu

40,000.00

Material 1.5

Jumlah Biaya Pembersihan 1 m2 L3

1 m3 Membongkar pasangan batu kali Upah 0.2 Mandor 2 Pekerja

33,000.00 20,000.00 Jumlah

1 m3 Membongkar pasangan beton bertulang Upah 0.2 Mandor 4 Pekerja

33,000.00 20,000.00 Jumlah

L11

10 m2 membongkar lantai jembatan kayu/dekplank Upah 0.6 Tukang Kayu 30,000.00 0.06 Kepala Tukang 32,000.00 Jumlah 1 m2 diperlukan upah

F1

1 m3 Pasang kayu perancah Upah 15 Tukang Kayu 1.5 Kepala Tukang 0.25 Mandor 5 Pekerja

30,000.00 32,000.00 33,000.00 20,000.00 Jumlah

Bahan 1.00 m3 kayu tahun perancah

a. Rp.

1,450,000.00

E13

1 m' Tiang kayu dipancangkan dalam didalam tanah yang lunak Upah 0.04 Tukang Kayu 30,000.00 0.004 Kepala Tukang 32,000.00 0.045 Mandor 33,000.00 1.8 Pekerja 20,000.00 Jumlah Bahan 1.00 m' kayu kruing 55,000.00

K9

1 m2 Mengecat 3 kali Upah 0.075 Tukang cat 0.0075 Kepala Tukang 0.0025 Mandor 0.05 Pekerja

30,000.00 32,000.00 33,000.00 20,000.00 Jumlah Upah 3 x

Bahan 0.425 kg Cat Emco 0.174 ltr Minyak cat

27,500.00 6,000.00 Jumlah Jml. upah dan baha

K18a

1 m2 memeni Upah 0.075 0.0075 0.0025 0.05

Tukang cat Kepala Tukang Mandor Pekerja

30,000.00 32,000.00 33,000.00 20,000.00 Jumlah

Bahan 0.12 kg Meni 0.044 ltr Minyak cat

8,500.00 6,000.00 Jumlah Jml. upah dan baha

K18b

1 m2 Mengecat tembok Upah 0.075 Tukang cat 0.0075 Kepala Tukang 0.0025 Mandor

30,000.00 32,000.00 33,000.00

0.05

Pekerja

20,000.00 Jumlah

Bahan 0.25 kg Cat tembok

40,000.00 Jumlah Jml. upah dan baha

K36

1 m2 Mengeter 3 Upah 0.005 0.1 . Bahan 0.35 ltr

kali Mandor Pekerja

33,000.00 20,000.00 Jumlah

Ter

3,000.00 Jumlah Jml. upah dan baha

DAFTAR ANALISA KECAMATAN NGANJUK

JUMLAH HARGA ( RP ) 5

15,000.00 825.00 15,825.00

20,000.00 1,089.00 21,089.00

dari lubang galian yang dalamnya lebih dari 1 m 3,000.00 26,647.50 29,647.50

37,800.00

5,000.00 330.00 43,130.00

960,000.00 600,000.00 600,000.00 3,000,000.00

1,650,000.00 260,000.00 6,500.00 2,100,000.00

9,176,500.00

2,100,000.00 346,200.00 136,400.00 96,600.00 207,000.00

270,000.00 360,000.00 29,700.00 244,706.67 3,790,606.67 37,906.07

1,500,000.00 230,800.00 95,480.00 67,620.00 150,000.00

180,000.00 240,000.00 19,800.00 244,706.67 2,728,406.67 27,284.07

49,080.00

7,500.00 656.70 57,236.70

9,520.00 1,625.00 7,500.00 627.00 1,223.53 20,495.53

11,900.00 1,625.00 7,500.00 627.00 1,223.53 22,875.53

436,800.00 90,200.00 150,000.00 12,375.00 244,706.67 934,081.67 9,340.82

450,000.00 57,960.00 75,000.00

9,000.00 160,000.00 13,200.00 12,235.33 777,395.33 7,773.95

1,713.60

15,000.00 825.00 30,000.00 2,475.00 48,300.00 1,610.00 1,713.60 3,323.60

57,120.00 99,430.00 23,542.20

36,000.00 3,840.00 72,000.00 5,940.00 297,872.20

57,120.00

30,000.00 2,475.00 89,595.00

3,202.50 383.35

3,600.00 384.00 7,200.00 594.00 15,363.85

4,270.00 514.14

4,500.00 480.00 8,000.00 660.00 18,424.14

mp. 1 : 2 1/2 : 5 ( untuk lantaikerja pondasi

63,000.00 152,500.00 22,550.00

15,000.00 1,600.00 120,000.00 9,900.00 384,550.00

63,000.00 129,320.00 22,550.00

15,000.00 1,600.00 120,000.00 9,900.00 361,370.00

51,660.00 207,400.00 24,354.00

30,000.00 3,200.00 120,000.00 9,900.00 446,514.00

605,000.00 14,000.00 619,000.00 270,000.00 96,000.00 180,000.00 546,000.00

409,500.00 1,028,500.00

1,285,625.00

1,645,600.00

360,000.00 30,000.00 390,000.00

15,000.00 1,600.00 4,000.00 330.00 20,930.00 209,300.00 599,300.00

80,000.00 446,514.00 2,411,439.00 2,771,414.00 2,092,114.00 1,732,139.00

57,120.00 99,430.00 23,542.20 180,092.20

36,000.00 3,840.00 72,000.00 5,940.00 117,780.00 147,225.00 327,317.20 32,731.72

22,500.00 2,400.00 5,000.00 396.00 8,250.00 38,546.00 220,000.00 104,000.00 324,000.00 362,546.00

6,000.00 640.00 2,000.00 165.00 8,805.00 28,750.00 375.00 29,125.00 37,930.00

337,500.00

44,000.00 36,000.00 2,640.00 420,140.00

171,360.00 40,950.00 90,000.00 2,475.00 304,785.00 241,641.67

270,000.00 96,000.00 180,000.00 546,000.00 5,460.00

660,000.00 6,600.00

15,000.00 40,000.00 55,000.00 41,250.00 412.50 12,472.50

33,000.00 720,000.00

60,000.00 813,000.00 903.33

6,600.00 40,000.00 46,600.00

6,600.00 80,000.00 86,600.00

18,000.00 1,920.00 19,920.00 1,992.00

450,000.00 48,000.00 8,250.00 100,000.00 606,250.00 1,450,000.00 2,056,250.00

1,200.00 128.00 1,485.00 36,000.00 38,813.00 55,000.00 93,813.00

2,250.00 240.00 82.50 1,000.00 3,572.50 10,717.50 11,687.50 1,044.00 12,731.50 23,449.00

2,250.00 240.00 82.50 1,000.00 3,572.50 1,020.00 264.00 1,284.00 4,856.50

2,250.00 240.00 82.50

1,000.00 3,572.50

10,000.00 10,000.00 13,572.50

165.00 2,000.00 2,165.00 1,050.00 1,050.00 3,215.00

DAFTAR ANALISA KECAMATAN KERTOSONO

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.2.2.1

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

HARGA SATUAN PEKERJAAN PERSIAPAN

A.2.2.1.1 (K3) Pembuatan 1 m² pagar sementara dari kayu tinggi 2 meter A TENAGA Pekerja L.01 OH Tukang Kayu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Dolken Kayu Ø 8 - 10 / 400 cm Semen portland Pasir beton Koral beton Kayu 5/7 Paku biasa 2"-5" Residu

Batang Kg M³ M³ M³ Kg Liter

0.400 0.200 0.020 0.020 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

32,000.00 18,000.00 2,000.00 2,200.00 54,200.00

1.250 5.000 0.005 0.009 0.072 0.060 0.400 Jumlah Harga Bahan

25,000.00 45,800.00 265,000.00 306,000.00 5,500,000.00 16,400.00 18,000.00

31,250.00 229,000.00 1,325.00 2,754.00 396,000.00 984.00 7,200.00 668,513.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.2.2.1.2 (K3) Pembuatan 1 m² pagar sementara dari seng gelombang tinggi 2 meter A TENAGA Pekerja L.01 OH 0.200 Tukang Kayu L.02 OH 0.400 Kepala Tukang L.03 OH 0.020 Mandor L.04 OH 0.020 Jumlah Tenaga Kerja B BAHAN Dolken Kayu Ø 8 - 10 / 400 cm Batang 1.250 Semen portland Kg 2.500 Minyak Cat ( Thinner A ) Lbr 1.200 M³ Pasir beton 0.005 M³ Koral beton 0.009 M³ Kayu 5/7 0.072 Paku biasa 2"-5" Kg 0.060 Meni besi Liter 0.450 Jumlah Harga Bahan C PERALATAN

0.00

722,713.00

80,000.00 90,000.00 100,000.00 110,000.00

16,000.00 36,000.00 2,000.00 2,200.00 56,200.00

25,000.00 45,800.00 27,600.00 265,000.00 306,000.00 5,500,000.00 16,400.00 36,000.00

31,250.00 114,500.00 33,120.00 1,325.00 2,754.00 396,000.00 984.00 16,200.00 596,133.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit

15%

722,713.00 108,406.95 831,119.95

0.00

652,333.00

652,333.00 97,849.95

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7 750,182.95

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.2.2.1.3 (K3) Pembuatan 1 m² pagar sementara dari kawat duri tinggi 1,8 meter A TENAGA Pekerja L.01 OH 0.200 Tukang Kayu L.02 OH 0.300 Kepala Tukang L.03 OH 0.020 Mandor L.04 OH 0.020 Jumlah Tenaga Kerja B BAHAN Dolken Kayu Ø 8 - 10 / 400 cm Batang 1.000 Semen portland Kg 2.000 Kawat duri M' 25.000 M³ Pasir beton 0.005 M³ Koral beton 0.009 Paku biasa 2"-5" Kg 0.060 Jumlah Harga Bahan C PERALATAN

15%

7

80,000.00 90,000.00 100,000.00 110,000.00

16,000.00 27,000.00 2,000.00 2,200.00 47,200.00

25,000.00 45,800.00 19,800.00 265,000.00 306,000.00 16,400.00

25,000.00 91,600.00 495,000.00 1,325.00 2,754.00 984.00 616,663.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

663,863.00

0.00 663,863.00 99,579.45 763,442.45

A.2.2.1.4 Pengukuran dan Pemasangan 1 M' Bouwplank A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor B BAHAN Kayu 5/7 Paku 2"- 3" Kayu papan 3/20

L.01 L.02 L.03 L.04

OH OH OH OH

0.100 0.100 0.010 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

8,000.00 9,000.00 1,000.00 550.00 18,550.00



0.120 0.120 0.007 Jumlah Harga Bahan

5,500,000.00 16,400.00 5,583,300.00

660,000.00 1,968.00 39,083.10 701,051.10

Kg M³

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.2.2.1.5 (K3) Pembuatan 1M² kantor sementara lantai plesteran A TENAGA Pekerja L.01 OH Tukang Kayu L.02 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH

15%

2.000 2.000 1.000 0.300 0.050 Jumlah Tenaga Kerja

719,601.10

80,000.00 90,000.00 90,000.00 100,000.00 110,000.00

0.00 719,601.10 107,940.17 827,541.27

160,000.00 180,000.00 90,000.00 30,000.00 5,500.00 465,500.00

NO

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

1

B BAHAN Dolken Kayu Ø 8 - 10 / 400 cm

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

Batang M³

1.250 0.180

25,000.00 5,500,000.00

31,250.00 990,000.00

Paku biasa Besi Strip

Kg Kg

0.080 1.100

16,400.00 48,800.00

1,312.00 53,680.00

Semen portland

Kg M³

35.000

1,145.00

40,075.00

0.150 0.100

265,000.00 265,000.00

39,750.00 26,500.00

Bh

0.150 30.000

306,000.00 650.00

45,900.00 19,500.00

Seng Talang BJLS 30 x 90 cm

Lbr

0.250

32,800.00

8,200.00

Jendela naco Kaca polos

Bh M²

0.200 0.080

18,000.00

#VALUE! 1,440.00

Kunci tanam Plywood 4 mm

Bh Lbr

0.150 0.060

16,400.00 65,000.00

2,460.00 3,900.00

Kayu

Pasir Pasang Pasir beton Koral beton Bata merah

M³ M³

Jumlah Harga Bahan

#VALUE!

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.2.2.1.6 (K3) Pembuatan 1M² rumah jaga (Konstruksi kayu) A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Dolken Kayu Ø 8 - 10 / 400 cm Kayu Paku biasa Seng gelombang

15%

0.00

#VALUE!

#VALUE! #VALUE! #VALUE!

OH OH OH OH

1.000 1.500 0.150 0.050 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

80,000.00 135,000.00 15,000.00 5,500.00 235,500.00

Batang M³

3.000 0.276 0.700 1.500 Jumlah Harga Bahan

25,000.00 5,500,000.00 16,400.00 27,600.00

75,000.00 1,518,000.00 11,480.00 41,400.00 1,645,880.00

Kg Kg

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

1,881,380.00

1,881,380.00 282,207.00 2,163,587.00

NO

URAIAN

KODE

1 2 3 A.2.2.1.7 (K3) Pembuatan 1M² gudang semen dan peralatan A TENAGA Pekerja

SAT

KOEFISIEN

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

L.01

OH

1.000

80,000.00

80,000.00

Tukang Kayu Kepala Tukang

L.02 L.03

OH OH

2.000 0.200

90,000.00 100,000.00

180,000.00 20,000.00

Mandor

L.04

OH

0.050

110,000.00

Jumlah Tenaga Kerja B BAHAN Dolken Kayu Ø 8 - 10 / 400 cm

Batang M³

Kayu

5,500.00 285,500.00

1.700 0.210

25,000.00 5,500,000.00

42,500.00 1,155,000.00

Paku biasa

Kg

0.300

16,400.00

4,920.00

Semen portland Pasir beton

Kg M³ M³

10.500 0.030

45,800.00 265,000.00

480,900.00 7,950.00

0.050 1.500

306,000.00 27,600.00

15,300.00 41,400.00

32,800.00

8,200.00 1,756,170.00

Koral beton Seng gelombang

Lbr

Seng plat

Lbr

0.250 Jumlah Harga Bahan

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit

15%

0.00

2,041,670.00

F Harga Satuan Pekerjaaan (D+E)

2,041,670.00 306,250.50 2,347,920.50

A.2.2.1.8 (K3) Pembuatan 1M² bedeng pekerja A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

B BAHAN Dolken Kayu Ø 8 - 10 / 400 cm Kayu Paku biasa Semen portland Pasir beton Koral beton Seng gelombang Plywood 4mm

L.01 L.02 L.03 L.04

OH OH OH OH

1.000 2.000 0.200 0.050 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

80,000.00 180,000.00 20,000.00 5,500.00 285,500.00

Batang M³

1.250 0.186 0.300 18.000 0.030 0.050 1.500 1.350 Jumlah Harga Bahan

25,000.00 5,500,000.00 16,400.00 45,800.00 265,000.00 306,000.00 27,600.00 65,000.00

31,250.00 1,023,000.00 4,920.00 824,400.00 7,950.00 15,300.00 41,400.00 87,750.00 2,035,970.00

Kg Kg M³ M³ Lbr Lbr

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

2,321,470.00

2,321,470.00 348,220.50 2,669,690.50

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.2.2.1.9 (K3) Pembuatan 1M² lapangan dan perataan A TENAGA Pekerja

L.01

OH

Mandor

L.04

OH

0.100

80,000.00

0.050

110,000.00

8,000.00 5,500.00

Jumlah Tenaga Kerja

13,500.00

Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

B BAHAN

C PERALATAN

D Jumlah (A+B+C)

13,500.00

E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.2.2.1.10 (K3) Pembuatan 1M² steger/perancah dari bambu A TENAGA Pekerja L.01 OH Tukang Kayu L.02 OH Kepala Tukang Mandor B BAHAN Bambu Ø 6 - 8 / 600 cm Tali ijuk

L.03 L.04

OH OH

Batang M³

1.000 2.000 0.200 0.050 Jumlah Tenaga Kerja 1.250

13,500.00

2,025.00 15,525.00

80,000.00 90,000.00

80,000.00 180,000.00

100,000.00 110,000.00

20,000.00 5,500.00 285,500.00

79,100.00

98,875.00

-

#VALUE! #VALUE!

0.186 Jumlah Harga Bahan

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

#VALUE!

#VALUE! #VALUE! #VALUE!

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.2.2.1.11 Pembuatan 1 buah kotak adukan ukuran 40cm x 50cm x 25cm A TENAGA Tukang Kayu Kepala Tukang

L.02

OH

L.03

OH

0.300

90,000.00

0.030

100,000.00

Jumlah Tenaga Kerja

27,000.00 3,000.00 30,000.00

B BAHAN Kayu papan kelas III Kayu balok 5/7 kelas III



Paku biasa

Kg



0.036 0.014

5,583,300.00 5,419,400.00

0.080

1,800.00

Jumlah Harga Bahan

200,998.80 75,871.60 144.00 277,014.40

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit

15%

0.00

307,014.40

F Harga Satuan Pekerjaaan (D+E)

307,014.40 46,052.16 353,066.56

A.2.2.1.12 Pembuatan 1 M² jalan sementara A TENAGA Pekerja Mandor

L.01 L.04

B BAHAN Batu belah Batu pecah Pasir Pasang

OH OH

M³ M³ M³

1.000 0.005 Jumlah Tenaga Kerja 0.150 0.090 0.010 Jumlah Harga Bahan

80,000.00 110,000.00

80,000.00 550.00 80,550.00

182,000.00

27,300.00

306,000.00 265,000.00

27,540.00 2,650.00 57,490.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.2.2.1.13 Pembongkaran 1 M³ beton bertulang A TENAGA Pekerja L.01 Mandor L.04

15%

OH OH

13.334 0.666 Jumlah Tenaga Kerja

0.00

138,040.00

80,000.00 110,000.00

138,040.00 20,706.00 158,746.00

1,066,720.00 73,260.00 1,139,980.00

B BAHAN Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

HARGA SATUAN (Rp.) 6

1,139,980.00

JUMLAH HARGA (Rp.) 7 1,139,980.00 170,997.00 1,310,977.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.2.2.1.14 Pembongkaran 1 M³ dinding tembok bata A TENAGA Pekerja

L.01

OH

Mandor

L.04

OH

6.667

80,000.00

0.333

110,000.00

533,360.00 36,630.00

Jumlah Tenaga Kerja

569,990.00

Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

B BAHAN

C PERALATAN

D Jumlah (A+B+C)

569,990.00

E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.2.2.1.15 Pemasangan 1 M² pagar kawat jaring galvanis panjang 240 cm A TENAGA Pekerja L.01 OH Tukang pipa L.02 OH Kepala Tukang Mandor B BAHAN Kawat jaring

L.03 L.04

OH OH

Lbr

0.042 0.004 0.002 0.042 Jumlah Tenaga Kerja 0.1434

569,990.00

85,498.50 655,488.50

80,000.00 90,000.00

3,360.00 360.00

100,000.00 110,000.00

200.00 4,620.00 8,540.00

29,400.00

4,215.96

Jumlah Harga Bahan

4,215.96

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.2.2.1.16 Pemasangan 1 M² panel beton pracetak 5x50x213 cm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Panel beton pracetak Kolom beton pracetak Semen PC Pasir beton Koral beton

lembar batang Kg M³ M³

0.375 0.125 0.012 0.019 Jumlah Tenaga Kerja 0.986 0.525 45.000 0.074 0.146

0.00

12,755.96

12,755.96 1,913.39 14,669.35

80,000.00 90,000.00 100,000.00 110,000.00

30,000.00 11,250.00 1,200.00 2,090.00 44,540.00

9,800.00 265,000.00 306,000.00

#VALUE! #VALUE! 441,000.00 19,610.00 44,676.00

NO

URAIAN

KODE

SAT

1

2

3

4

KOEFISIEN 5

HARGA SATUAN (Rp.) 6

Jumlah Harga Bahan

JUMLAH HARGA (Rp.) 7 #VALUE!

C PERALATAN Jumlah Harga Alat

0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

#VALUE! 15%

#VALUE!

#VALUE! #VALUE!

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 meter A TENAGA Pekerja

L.01

OH

Mandor

L.04

OH

0.750

80,000.00

0.025

110,000.00

60,000.00 2,750.00

Jumlah Tenaga Kerja

62,750.00

Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

B BAHAN

C PERALATAN

D Jumlah (A+B+C)

62,750.00

E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.2.3.1.2 Penggalian 1 m³ tanah biasa sedalam 2 meter A TENAGA Pekerja L.01 Mandor L.04

15%

OH OH

0.900 0.045 Jumlah Tenaga Kerja

62,750.00

9,412.50 72,162.50

80,000.00 110,000.00

72,000.00 4,950.00 76,950.00

B BAHAN Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.2.3.1.3 Penggalian 1 m³ tanah biasa sedalam 3 meter A TENAGA Pekerja L.01 Mandor L.04

15%

OH OH

1.050 0.067 Jumlah Tenaga Kerja

76,950.00

80,000.00 110,000.00

76,950.00 11,542.50 88,492.50

84,000.00 7,370.00 91,370.00

B BAHAN Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

91,370.00

91,370.00 13,705.50 105,075.50

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.2.3.1.4 Penggalian 1 m³ tanah keras sedalam 1 meter A TENAGA Pekerja

L.01

OH

Mandor

L.04

OH

1.000

80,000.00

0.032

110,000.00

80,000.00 3,520.00

Jumlah Tenaga Kerja

83,520.00

Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

B BAHAN

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit

15%

83,520.00

F Harga Satuan Pekerjaaan (D+E)

96,048.00

A.2.3.1.5 Penggalian 1 m³ tanah cadas sedalam 1 meter A TENAGA Pekerja L.01 Mandor

83,520.00 12,528.00

L.04

OH OH

1.500 0.060 Jumlah Tenaga Kerja

80,000.00

120,000.00

110,000.00

6,600.00 126,600.00

B BAHAN Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.2.3.1.6 Penggalian 1 m³ tanah Lumpur sedalam 1 meter A TENAGA Pekerja L.01 Mandor L.04

15%

OH OH

1.200 0.045 Jumlah Tenaga Kerja

126,600.00

80,000.00 110,000.00

126,600.00 18,990.00 145,590.00

96,000.00 4,950.00 100,950.00

B BAHAN Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

100,950.00

100,950.00 15,142.50 116,092.50

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.2.3.1.7 Pengerjaan Stripping 1 m² tanah tebing setinggi 1 meter A TENAGA Pekerja Mandor

L.01 L.04

OH OH

0.050 0.005

80,000.00 110,000.00

4,000.00 550.00

Jumlah Tenaga Kerja

4,550.00

Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

B BAHAN

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit

15%

4,550.00

F Harga Satuan Pekerjaaan (D+E)

4,550.00 682.50 5,232.50

A.2.3.1.8 Pembuangan 1 m³ tanah sejauh 30 meter A TENAGA Pekerja Mandor

L.01 L.04

OH OH

0.330 0.010 Jumlah Tenaga Kerja

80,000.00 110,000.00

26,400.00 1,100.00 27,500.00

B BAHAN Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

27,500.00

27,500.00 4,125.00 31,625.00

A.2.3.1.9 Pengurugan kembali 1 m³ galian tanah Pengurugan kembali 1M³ galian dihitung dari 1/3 kali dari koefisien pekerjaan galian A TENAGA Pekerja Mandor

L.01 L.04

OH OH

0.500 0.050 Jumlah Tenaga Kerja

80,000.00 110,000.00

40,000.00 5,500.00 45,500.00

B BAHAN Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

45,500.00

45,500.00 6,825.00 52,325.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.2.3.1.10 (K3) Pemadatan tanah 1 m³ tanah (per 20cm) A TENAGA Pekerja Mandor

L.01 L.04

OH OH

0.500 0.050

80,000.00 110,000.00

40,000.00 5,500.00

Jumlah Tenaga Kerja

45,500.00

Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

B BAHAN

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit

15%

45,500.00

F Harga Satuan Pekerjaaan (D+E)

45,500.00 6,825.00 52,325.00

A.2.3.1.11 Pengurugan 1 m³ dengan pasir urug A TENAGA Pekerja Mandor

B BAHAN Pasir Urug

L.01 L.04

OH OH

0.300 0.010 Jumlah Tenaga Kerja

80,000.00 110,000.00

24,000.00 1,100.00 25,100.00



1.200 Jumlah Harga Bahan

166,000.00

199,200.00 199,200.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.2.3.1.12 Pemasangan 1 m³ lapisan pudel campuran 1KP:3PP:7TL A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Kapur Pasang padam Pasir Pasang Tanah liat

Batang M³ Kg

0.800 0.400 0.040 0.080 Jumlah Tenaga Kerja 0.135 0.400 0.948 Jumlah Harga Bahan

0.00

224,300.00

80,000.00 90,000.00 100,000.00 110,000.00

265,000.00 160,000.00

224,300.00 33,645.00 257,945.00

64,000.00 36,000.00 4,000.00 8,800.00 112,800.00 0.00 106,000.00 151,680.00 257,680.00

C PERALATAN Jumlah Harga Alat

0.00

NO 1

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

HARGA SATUAN (Rp.) 6

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.) 7 370,480.00

15%

370,480.00

55,572.00 426,052.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.2.3.1.13 Pemasangan 1 M² lapisan ijuk tebal 10cm untuk bidang resapan A TENAGA Pekerja Mandor

L.01 L.04

OH OH

0.150 0.015

80,000.00 110,000.00

Jumlah Tenaga Kerja B BAHAN Ijuk



12,000.00 1,650.00 13,650.00

6.000

0.00

Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit

15%

13,650.00

F Harga Satuan Pekerjaaan (D+E)

13,650.00 2,047.50 15,697.50

A.2.3.1.14 Pengurugan 1 M² sirtu padat A TENAGA Pekerja Mandor

L.01 L.04

OH OH

0.250 0.025 Jumlah Tenaga Kerja

80,000.00 110,000.00

20,000.00 2,750.00 22,750.00



1.200 Jumlah Harga Bahan

188,000.00

225,600.00 225,600.00

B BAHAN Sirtu C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI A.3.2.1.1 Pemasangan 1 m³ pondasi batu belah campuran 1SP : 3 PP A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Batu belah Semen Portland Pasir Pasang

M³ Kg M³

0.00

248,350.00

248,350.00 37,252.50 285,602.50

1.500 0.750 0.075 0.075 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

120,000.00 67,500.00 7,500.00 8,250.00 203,250.00

1.200 202.000 0.485 Jumlah Harga Bahan

182,000.00 1,145.00 265,000.00

218,400.00 231,290.00 128,525.00 578,215.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C)

0.00 781,465.00

NO 1

URAIAN

KODE

SAT

2

3

4

E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KOEFISIEN 5 15%

HARGA SATUAN (Rp.) 6 781,465.00

JUMLAH HARGA (Rp.) 7 117,219.75 898,684.75

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.3.2.1.2 Pemasangan 1 m³ pondasi batu belah campuran 1SP : 4 PP A TENAGA Pekerja Tukang Batu

L.01 L.02

OH OH

1.500 0.750

80,000.00 90,000.00

120,000.00 67,500.00

Kepala Tukang

L.03

OH

0.075

100,000.00

7,500.00

Mandor

L.04

OH

110,000.00

8,250.00 203,250.00

B BAHAN Batu belah Semen Portland Pasir Pasang

0.075 Jumlah Tenaga Kerja



1.200

182,000.00

218,400.00

Kg M³

163.000

1,145.00

186,635.00

265,000.00

137,800.00 542,835.00

0.520 Jumlah Harga Bahan

C PERALATAN Jumlah Harga Alat

0.00

D Jumlah (A+B+C)

746,085.00

E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

746,085.00

111,912.75 857,997.75

A.3.2.1.3 Pemasangan 1 m³ pondasi batu belah campuran 1SP : 5 PP A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor B BAHAN Batu belah Semen Portland Pasir Pasang

L.01 L.02 L.03 L.04

OH OH OH OH

1.500 0.750 0.075 0.075 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

120,000.00 67,500.00 7,500.00 8,250.00 203,250.00



1.200 136.000 0.544 Jumlah Harga Bahan

182,000.00 1,145.00 265,000.00

218,400.00 155,720.00 144,160.00 518,280.00

Kg M³

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.3.2.1.4 Pemasangan 1 m³ pondasi batu belah campuran 1SP : 6 PP A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Batu belah Semen Portland

M³ Kg

1.500 0.750 0.075 0.075 Jumlah Tenaga Kerja 1.200 117.000

0.00

721,530.00

721,530.00 108,229.50 829,759.50

80,000.00 90,000.00 100,000.00 110,000.00

120,000.00 67,500.00 7,500.00 8,250.00 203,250.00

182,000.00 1,145.00

218,400.00 133,965.00

NO 1

URAIAN

KODE

SAT

KOEFISIEN

2

3

4 M³

5

Pasir Pasang

HARGA SATUAN (Rp.) 6

0.561

265,000.00

Jumlah Harga Bahan

JUMLAH HARGA (Rp.) 7 148,665.00 501,030.00

C PERALATAN Jumlah Harga Alat

0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

704,280.00 15%

704,280.00

105,642.00 809,922.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.3.2.1.5 Pemasangan 1 m³ pondasi batu belah campuran 1SP : 8 PP A TENAGA Pekerja Tukang Batu

L.01 L.02

OH OH

1.500 0.750

80,000.00 90,000.00

120,000.00 67,500.00

Kepala Tukang

L.03

OH

0.075

100,000.00

7,500.00

Mandor

L.04

OH

110,000.00

8,250.00 203,250.00

B BAHAN Batu belah Semen Portland Pasir Pasang

0.075 Jumlah Tenaga Kerja



1.200

182,000.00

218,400.00

Kg M³

91.000

1,145.00

104,195.00

265,000.00

154,760.00 477,355.00

0.584 Jumlah Harga Bahan

C PERALATAN Jumlah Harga Alat

0.00

D Jumlah (A+B+C)

680,605.00

E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

680,605.00

102,090.75 782,695.75

A.3.2.1.6 Pemasangan 1 m³ pondasi batu belah campuran 1SP : 1 KP : 2 PP A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor B BAHAN Batu belah Kapur Pasang Semen Portland Pasir Pasang

L.01 L.02 L.03 L.04

OH OH OH OH

1.500 0.750 0.075 0.075 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

120,000.00 67,500.00 7,500.00 8,250.00 203,250.00

M³ M³

1.200 0.170 0.170 0.340 Jumlah Harga Bahan

182,000.00 0.00 1,145.00 265,000.00

218,400.00 0.00 194.65 90,100.00 308,694.65

Kg M³

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.3.2.1.7 Pemasangan 1 m³ pondasi batu belah campuran 1SP : 3 KP : 10 PP A TENAGA Pekerja L.01 OH 1.500 Tukang Batu L.02 OH 0.750 Kepala Tukang L.03 OH 0.075 Mandor L.04 OH 0.075 Jumlah Tenaga Kerja B BAHAN M³ Batu belah 1.200

0.00

511,944.65

511,944.65 76,791.70 588,736.35

80,000.00 90,000.00 100,000.00 110,000.00

120,000.00 67,500.00 7,500.00 8,250.00 203,250.00

182,000.00

218,400.00

NO

URAIAN

KODE

SAT

KOEFISIEN

2

3

4 M³

5

Semen Portland Kapur Pasang Pasir Pasang

Kg M³

1

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

61.000

1,145.00

69,845.00

0.147 0.492

0.00 265,000.00

0.00 130,380.00

Jumlah Harga Bahan

418,625.00

Jumlah Harga Alat

0.00 621,875.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

621,875.00

93,281.25 715,156.25

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.3.2.1.8 Pemasangan 1 m³ pondasi batu belah campuran ¼SP : 1 KP : 4 PP A TENAGA Pekerja Tukang Batu

L.01 L.02

OH OH

1.500 0.750

80,000.00 90,000.00

120,000.00 67,500.00

Kepala Tukang

L.03

OH

0.075

100,000.00

7,500.00

Mandor

L.04

OH

110,000.00

8,250.00 203,250.00

B BAHAN Batu belah

0.075 Jumlah Tenaga Kerja

M³ M³

1.200

182,000.00

218,400.00

Semen Portland

41.000

1,145.00

46,945.00

Kapur Pasang Pasir Pasang

Kg M³

0.131 0.523

0.00 265,000.00

0.00 138,595.00

Jumlah Harga Bahan

403,940.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

607,190.00

607,190.00 91,078.50 698,268.50

80,000.00 90,000.00 100,000.00 110,000.00

62,400.00 35,100.00 3,900.00 4,290.00

A.3.2.1.9 (K3) Pemasangan 1 m³ batu kosong ( anstamping ) A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

L.01 L.02 L.03 L.04

OH OH OH OH

0.780 0.390 0.039 0.039 Jumlah Tenaga Kerja

B BAHAN Batu belah Pasir urug

M³ M³

1.200 0.432 Jumlah Harga Bahan

105,690.00 182,000.00 166,000.00

218,400.00 71,712.00 290,112.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

395,802.00

395,802.00 59,370.30 455,172.30

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.3.2.1.10 Pemasangan 1 m³ pondasi siklop, 60% beton campuran 1SP : 2 PB : 3Kr dan 40% batu belah A TENAGA Pekerja Tukang Batu

L.01 L.02

OH OH

3.400 0.850

80,000.00 90,000.00

Kepala Tukang

L.03

OH

0.085

100,000.00

8,500.00

Mandor

L.04

OH

110,000.00

18,700.00 375,700.00

B BAHAN Batu belah Semen Portland Pasir beton Kerikil Besi beton Kawat beton

0.170 Jumlah Tenaga Kerja

272,000.00 76,500.00



0.480

182,000.00

87,360.00

Kg M³

194.000

1,145.00

222,130.00



0.312 0.468

265,000.00 306,000.00

82,680.00 143,208.00

Kg Kg

126.000 1.800

9,200.00 20,000.00

1,159,200.00 36,000.00

Jumlah Harga Bahan

1,730,578.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.3.2.1.11 Pemasangan 1 m³ pondasi sumuran, diameter 100 cm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang Mandor B BAHAN Batu belah Semen Portland Pasir beton Kerikil

L.03 L.04

OH OH

2.400 0.800 0.080 0.119 Jumlah Tenaga Kerja

M³ Kg M³ M³

0.450 194.000 0.312 0.468 Jumlah Harga Bahan

0.00

2,106,278.00

2,106,278.00 315,941.70 2,422,219.70

80,000.00 90,000.00

192,000.00 72,000.00

100,000.00 110,000.00

8,000.00 13,090.00 285,090.00

182,000.00 1,145.00 265,000.00 306,000.00

81,900.00 222,130.00 82,680.00 143,208.00 529,918.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

815,008.00

815,008.00 122,251.20 937,259.20

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.4.1.1 HARGA SATUAN PEKERJAAN BETON A.4.1.1.1 Membuat 1 M³ beton mutu f'с = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c =0,87 A TENAGA Pekerja

L.01

OH

1.650

80,000.00

132,000.00

Tukang Batu

L.02

OH

Kepala Tukang Mandor

L.03 L.04

OH OH

0.275

90,000.00

24,750.00

0.028 0.083

100,000.00 110,000.00

2,800.00 9,130.00

Jumlah Tenaga Kerja

168,680.00

B BAHAN Semen Portland

Kg

247.000

1,145.00

282,815.00

Pasir beton Koral beton

Kg Kg

869.000 999.000

189.29 170.00

164,489.28 169,830.00

Air

Liter

50.00

10,750.00 627,884.28

215.000 Jumlah Harga Bahan

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.1.1.2 Membuat 1 M³ beton mutu f'с = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c =0,78 A TENAGA Pekerja L.01 OH 1.650 Tukang Batu L.02 OH 0.275 Kepala Tukang L.03 OH 0.028 Mandor B BAHAN Semen Portland Pasir beton Koral beton Air

L.04

0.00

796,564.28

796,564.28 119,484.64 916,048.92

80,000.00 90,000.00 100,000.00

132,000.00 24,750.00 2,800.00

OH

0.083 Jumlah Tenaga Kerja

110,000.00

9,130.00 168,680.00

Kg Kg Kg Liter

276.000 828.000 1012.000 215.000 Jumlah Harga Bahan

1,145.00 189.29 170.00 50.00

316,020.00 156,728.57 172,040.00 10,750.00 655,538.57

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

824,218.57

824,218.57 123,632.79 947,851.36

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.1.1.3 Membuat 1 M³ beton mutu f'с = 12,2 Mpa (K150), slump (12 ± 2) cm, w/c =0,72 A TENAGA Pekerja L.01 OH 1.650 Tukang Batu L.02 OH 0.275 Kepala Tukang L.03 OH 0.028 Mandor L.04 OH 0.083 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 299.000 Pasir beton Kg 799.000 Koral beton Kg 1017.000 Air Liter 215.000 Jumlah Harga Bahan C PERALATAN

15%

A.4.1.1.4 Membuat 1 M³ lantai kerja beton mutu f'с = 7,4 Mpa (K100), slump (3-6) cm, w/c =0,87 A TENAGA Pekerja L.01 OH 1.200 Tukang Batu Kepala Tukang Mandor B BAHAN Semen Portland Pasir beton Koral beton Air

L.02 L.03 L.04

7

80,000.00 90,000.00 100,000.00 110,000.00

132,000.00 24,750.00 2,800.00 9,130.00 168,680.00

1,145.00 189.29 170.00 50.00

342,355.00 151,239.28 172,890.00 10,750.00 677,234.28

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

845,914.28

845,914.28 126,887.14 972,801.42

80,000.00

96,000.00

OH OH OH

0.200 0.020 0.060 Jumlah Tenaga Kerja

90,000.00 100,000.00 110,000.00

18,000.00 2,000.00 6,600.00 122,600.00

Kg Kg Kg Liter

230.000 893.000 1027.000 200.000 Jumlah Harga Bahan

1,145.00 189.29 170.00 50.00

263,350.00 169,032.14 174,590.00 10,000.00 616,972.14

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.1.1.5 Membuat 1 M³ beton mutu f'с = 14,5 Mpa (K175), slump (12±2) cm, w/c =0,66 A TENAGA Pekerja L.01 OH 1.650 Tukang Batu L.02 OH 0.275 Kepala Tukang L.03 OH 0.028 Mandor L.04 OH 0.083 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 326.000 Pasir beton Kg 760.000 Koral beton Kg 1029.000 Air Liter 215.000 Jumlah Harga Bahan C PERALATAN

0.00

739,572.14

739,572.14 110,935.82 850,507.96

80,000.00 90,000.00 100,000.00 110,000.00

132,000.00 24,750.00 2,800.00 9,130.00 168,680.00

1,145.00 189.29 170.00 50.00

373,270.00 143,857.14 174,930.00 10,750.00 702,807.14

NO

URAIAN

KODE

SAT

1

2

3

4

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KOEFISIEN 5 Jumlah Harga Alat

15%

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7 0.00

871,487.14

871,487.14 130,723.07 1,002,210.21

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.1.1.6 Membuat 1 M³ beton mutu f'с = 16,9 Mpa (K200), slump (12±2) cm, w/c =0,61 A TENAGA Pekerja L.01 OH 1.650 Tukang Batu L.02 OH 0.275 Kepala Tukang L.03 OH 0.028 Mandor L.04 OH 0.083 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 352.000 Pasir beton Kg 731.000 Koral beton Kg 1031.000 Air Liter 215.000 Jumlah Harga Bahan C PERALATAN

15%

A.4.1.1.7 Membuat 1 M³ beton mutu f'с = 19,3 Mpa (K225), slump (12±2) cm, w/c =0,58 A TENAGA Pekerja L.01 OH 1.650 Tukang Batu L.02 OH 0.275 Kepala Tukang L.03 OH 0.028 Mandor L.04 OH 0.083 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 371.000 Pasir beton Kg 698.000 Koral beton Kg 1047.000 Air Liter 215.000 Jumlah Harga Bahan C PERALATAN

132,000.00 24,750.00 2,800.00 9,130.00 168,680.00

1,145.00 189.29 170.00 50.00

403,040.00 138,367.85 175,270.00 10,750.00 727,427.85

0.00

896,107.85

15%

A.4.1.1.8 Membuat 1 M³ beton mutu f'с = 21,7 Mpa (K250), slump (12±2) cm, w/c =0,56 A TENAGA Pekerja L.01 OH 1.650 Tukang Batu L.02 OH 0.275 Kepala Tukang L.03 OH 0.028 Mandor L.04 OH 0.083 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 384.000 Pasir beton Kg 692.000 Koral beton Kg 1039.000 Air Liter 215.000 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat

896,107.85 134,416.18 1,030,524.03

80,000.00 90,000.00 100,000.00 110,000.00

132,000.00 24,750.00 2,800.00 9,130.00 168,680.00

1,145.00 189.29 170.00 50.00

424,795.00 132,121.42 177,990.00 10,750.00 745,656.42

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

80,000.00 90,000.00 100,000.00 110,000.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

914,336.42

914,336.42 137,150.46 1,051,486.88

80,000.00 90,000.00 100,000.00 110,000.00

132,000.00 24,750.00 2,800.00 9,130.00 168,680.00

1,145.00 189.29 170.00 50.00

439,680.00 130,985.71 176,630.00 10,750.00 758,045.71

0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

HARGA SATUAN (Rp.) 6

926,725.71

JUMLAH HARGA (Rp.) 7 926,725.71 139,008.86 1,065,734.57

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.1.1.9 Membuat 1 M³ beton mutu f'с = 24,0 Mpa (K275), slump (12±2) cm, w/c =0,53 A TENAGA Pekerja L.01 OH 1.650 Tukang Batu L.02 OH 0.275 Kepala Tukang L.03 OH 0.028 Mandor L.04 OH 0.083 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 406.000 Pasir beton Kg 684.000 Koral beton Kg 1026.000 Air Liter 215.000 Jumlah Harga Bahan C PERALATAN

15%

A.4.1.1.10 Membuat 1 M³ beton mutu f'с = 26,4 Mpa (K300), slump (12±2) cm, w/c =0,52 A TENAGA Pekerja L.01 OH 1.650 Tukang Batu L.02 OH 0.275 Kepala Tukang L.03 OH 0.028 Mandor L.04 OH 0.083 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 413.000 Pasir beton Kg 681.000 Koral beton Kg 1021.000 Air Liter 215.000 Jumlah Harga Bahan C PERALATAN

132,000.00 24,750.00 2,800.00 9,130.00 168,680.00

1,145.00 189.29 170.00 50.00

464,870.00 129,471.42 174,420.00 10,750.00 779,511.42

0.00

948,191.42

15%

A.4.1.1.11 Membuat 1 M³ beton mutu f'с = 28,8 Mpa (K325), slump (12±2) cm, w/c =0,49 A TENAGA Pekerja L.01 OH 2.100 Tukang Batu L.02 OH 0.350 Kepala Tukang L.03 OH 0.035 Mandor L.04 OH 0.105 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 439.000 Pasir beton Kg 670.000 Koral beton Kg 1006.000 Air Liter 215.000 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat

948,191.42 142,228.71 1,090,420.13

80,000.00 90,000.00 100,000.00 110,000.00

132,000.00 24,750.00 2,800.00 9,130.00 168,680.00

1,145.00 189.29 170.00 50.00

472,885.00 128,903.57 173,570.00 10,750.00 786,108.57

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

80,000.00 90,000.00 100,000.00 110,000.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

954,788.57

954,788.57 143,218.29 1,098,006.86

80,000.00 90,000.00 100,000.00 110,000.00

168,000.00 31,500.00 3,500.00 11,550.00 214,550.00

1,145.00 189.29 170.00 50.00

502,655.00 126,821.42 171,020.00 10,750.00 811,246.42

0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

HARGA SATUAN (Rp.) 6

1,025,796.42

JUMLAH HARGA (Rp.) 7 1,025,796.42 153,869.46 1,179,665.88

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.1.1.12 Membuat 1 M³ beton mutu f'с = 31,2 Mpa (K350), slump (12±2) cm, w/c =0,48 A TENAGA Pekerja L.01 OH 2.100 Tukang Batu L.02 OH 0.350 Kepala Tukang L.03 OH 0.035 Mandor L.04 OH 0.105 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 448.000 Pasir beton Kg 667.000 Koral beton Kg 1000.000 Air Liter 215.000 Jumlah Harga Bahan C PERALATAN

JUMLAH HARGA (Rp.) 7

80,000.00 90,000.00 100,000.00 110,000.00

168,000.00 31,500.00 3,500.00 11,550.00 214,550.00

1,145.00 189.29 170.00 50.00

512,960.00 126,253.57 170,000.00 10,750.00 819,963.57

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.1.1.13 Membuat 1 M³ beton kedap air dengan strorox -100 A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Semen Portland Pasir beton Koral beton Strorox - 100

Kg M³ M³ Kg

0.00

1,034,513.57

1,034,513.57 155,177.04 1,189,690.61

2.100 0.350 0.035 0.105 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

168,000.00 31,500.00 3,500.00 11,550.00 214,550.00

400.000 0.480 0.800 1.200 Jumlah Harga Bahan

1,145.00 265,000.00 306,000.00

458,000.00 127,200.00 244,800.00 0.00 830,000.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.1.1.14 Pemasangan 1 m' PVC Waterstop lebar 150 mm A TENAGA Pekerja L.01 Tukang batu / Pipa L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Waterstop lebar 150 mm

15%

0.00

1,044,550.00

1,044,550.00 156,682.50 1,201,232.50

OH OH OH OH

0.060 0.030 0.003 0.003 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

4,800.00 2,700.00 300.00 330.00 8,130.00

M

1.050 Jumlah Harga Bahan

-

#VALUE! #VALUE!

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C)

0.00 #VALUE!

NO 1

URAIAN 2 E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

HARGA SATUAN (Rp.) 6 #VALUE!

JUMLAH HARGA (Rp.) 7 #VALUE! #VALUE!

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.1.1.15 Pemasangan 1 m' PVC Waterstop lebar 200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Waterstop lebar 200 mm

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.070 0.035 0.004 0.007 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

5,600.00 3,150.00 400.00 770.00 9,920.00

M

1.050 Jumlah Harga Bahan

-

#VALUE! #VALUE!

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.1.1.16 Pemasangan 1 m' PVC Waterstop lebar 230 mm - 320 mm A TENAGA Pekerja L.01 OH Tukang pipa L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Waterstop lebar 230 mm - 320 mm

M

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

0.080 0.040 0.004 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,400.00 3,600.00 400.00 440.00 10,840.00

1.050 Jumlah Harga Bahan

-

#VALUE! #VALUE!

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.1.1.17 Pembesian 10 Kg dengan besi polos atau besi ulir A TENAGA Pekerja L.01 Tukang Besi L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Besi beton (polos/ulir) Kawat beton

15%

0.00

#VALUE!

#VALUE! #VALUE! #VALUE!

OH OH OH OH

0.070 0.070 0.007 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

5,600.00 6,300.00 700.00 440.00 13,040.00

Kg Kg

10.500 0.150 Jumlah Harga Bahan

9,200.00 20,000.00

96,600.00 3,000.00 99,600.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

112,640.00 Pembesian 1 kg

A.4.1.1.18 Pemasangan 10 Kg kabel prategang ( prestressed ) polos/ strands A TENAGA

112,640.00 16,896.00 129,536.00 12,953.60

NO

URAIAN

KODE

SAT

2

3 L.01 L.02 L.03 L.04

4 OH OH OH OH

1 Pekerja Tukang Besi Kepala Tukang Mandor

B BAHAN Besi beton (polos/ulir) Kawat beton

Kg Kg

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.050 80,000.00 4,000.00 0.050 90,000.00 4,500.00 0.005 100,000.00 500.00 0.003 110,000.00 330.00 Jumlah Tenaga Kerja 9,330.00 KOEFISIEN

10.500 0.100 Jumlah Harga Bahan

9,200.00 20,000.00

96,600.00 2,000.00 98,600.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.1.1.19 Pemasangan 10 Kg jaring kawat baja (wiremesh) A TENAGA Pekerja L.01 Tukang Besi L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Jaring kawat baja dilas Kawat beton

15%

0.00

107,930.00

107,930.00 16,189.50 124,119.50

OH OH OH OH

0.025 0.025 0.025 0.001 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

2,000.00 2,250.00 2,500.00 110.00 6,860.00

Kg Kg

10.200 0.050 Jumlah Harga Bahan

20,000.00

#VALUE! 1,000.00 #VALUE!

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

#VALUE!

#VALUE! #VALUE! #VALUE!

NO

URAIAN

KODE

1 2 3 A.4.1.1.20 Pemasangan 1 M² bekisting untuk pondasi A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kayu kelas III Paku 5-10 cm Minyak bekisting

SAT

KOEFISIEN

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.520 0.260 0.026 0.026 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

41,600.00 23,400.00 2,600.00 2,860.00 70,460.00

M³ Kg Liter

0.040 0.300 0.100 Jumlah Harga Bahan

5,583,300.00 16,400.00 24,000.00

223,332.00 4,920.00 2,400.00 230,652.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.1.1.21 (K3) Pemasangan 1 M² bekisting untuk sloof A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kayu kelas III Paku 5-10 cm Minyak bekisting

15%

0.00

301,112.00

301,112.00 45,166.80 346,278.80

OH OH OH OH

0.520 0.260 0.026 0.026 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

41,600.00 23,400.00 2,600.00 2,860.00 70,460.00

M³ Kg Liter

0.045 0.300 0.100 Jumlah Harga Bahan

5,583,300.00 16,400.00 24,000.00

251,248.50 4,920.00 2,400.00 258,568.50

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.1.1.22 (K3) Pemasangan 1 M² bekisting untuk kolom A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kayu kelas III Paku 5-10 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu Ø 8-10cm panjang 4 m

15%

0.00

329,028.50

329,028.50 49,354.28 378,382.78

OH OH OH OH

0.660 0.330 0.033 0.033 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

52,800.00 29,700.00 3,300.00 3,630.00 89,430.00

M³ Kg Liter M³ Lbr Batang

0.040 0.400 0.200 0.015 0.350 2.000 Jumlah Harga Bahan

5,583,300.00 16,400.00 24,000.00 5,500,000.00 93,300.00 25,000.00

223,332.00 6,560.00 4,800.00 82,500.00 32,655.00 50,000.00 399,847.00

C PERALATAN Jumlah Harga Alat

0.00

NO 1

URAIAN 2 D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

HARGA SATUAN (Rp.) 6 489,277.00

JUMLAH HARGA (Rp.) 7 489,277.00 73,391.55 562,668.55

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.1.1.23 (K3) Pemasangan 1 M² bekisting untuk balok A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kayu kelas III Paku 5-10 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu Ø 8-10cm panjang 4 m

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.660 0.330 0.033 0.033 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

52,800.00 29,700.00 3,300.00 3,630.00 89,430.00

M³ Kg Liter M³ Lbr Batang

0.040 0.400 0.200 0.018 0.350 2.000 Jumlah Harga Bahan

5,583,300.00 16,400.00 24,000.00 5,500,000.00 93,300.00 25,000.00

223,332.00 6,560.00 4,800.00 99,000.00 32,655.00 50,000.00 416,347.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

505,777.00

505,777.00 75,866.55 581,643.55

A.4.1.1.24 (K3) Pemasangan 1 M² bekisting untuk lantai A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04

OH OH OH OH

0.660 0.330 0.033 0.033 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

52,800.00 29,700.00 3,300.00 3,630.00 89,430.00

B BAHAN Kayu kelas III Paku 5-10 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu galam Ø 8-10cm panj 4 m

M³ Kg Liter M³ Lbr Batang

0.040 0.400 0.200 0.015 0.350 6.000 Jumlah Harga Bahan

5,583,300.00 16,400.00 24,000.00 5,500,000.00 93,300.00 25,000.00

223,332.00 6,560.00 4,800.00 82,500.00 32,655.00 150,000.00 499,847.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.1.1.25 (K3) Pemasangan 1 M² bekisting untuk dinding A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kayu kelas III Paku 5-12 cm Minyak bekisting Balok kayu kelas II

15%

OH OH OH OH

M³ Kg Liter M³

0.00

589,277.00

0.660 0.330 0.033 0.033 Jumlah Tenaga Kerja 0.030 0.400 0.200 0.020

589,277.00 88,391.55 677,668.55

80,000.00 90,000.00 100,000.00 110,000.00

52,800.00 29,700.00 3,300.00 3,630.00 89,430.00

5,583,300.00 16,400.00 24,000.00 5,500,000.00

167,499.00 6,560.00 4,800.00 110,000.00

NO 1

URAIAN 2 Plywood tebal 9 mm Dolken kayu Ø 8-10cm panj 4 m Penjaga jarak bekisting / spacer

KODE

SAT

3

4 Lbr Batang Buah

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.350 93,300.00 32,655.00 3.000 25,000.00 75,000.00 4.000 #VALUE! Jumlah Harga Bahan #VALUE! KOEFISIEN

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

#VALUE!

#VALUE! #VALUE! #VALUE!

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.1.1.26 Pemasangan 1 M² bekisting untuk tangga A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kayu kelas III Paku 5-12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu Ø 8-10cm panj 4 m

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.660 0.330 0.033 0.033 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

52,800.00 29,700.00 3,300.00 3,630.00 89,430.00

M³ Kg Liter M³ Lbr Batang

0.030 0.400 0.150 0.015 0.350 2.000 Jumlah Harga Bahan

5,583,300.00 16,400.00 24,000.00 5,500,000.00 93,300.00 25,000.00

167,499.00 6,560.00 3,600.00 82,500.00 32,655.00 50,000.00 342,814.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.1.1.27 Pemasangan 1 M² jembatan untuk pengecoran beton A TENAGA Pekerja L.01 OH Tukang Kayu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Kayu kelas III (papan) Paku 5-12 cm Dolken kayu Ø 8-10cm panj 4 m

M³ Kg Batang

0.00

432,244.00

432,244.00 64,836.60 497,080.60

0.150 0.050 0.005 0.008 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

12,000.00 4,500.00 500.00 880.00 17,880.00

0.0264 0.600 0.500 Jumlah Harga Bahan

5,583,300.00 16,400.00 25,000.00

147,399.12 9,840.00 12,500.00 169,739.12

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.1.1.28 Membuat 1 M³ pondasi beton bertulang (150 Kg besi + Bekisting) A TENAGA Pekerja L.01 OH 5.300 Tukang Batu L.02 OH 0.275 Tukang Kayu L.02 OH 1.300 Tukang Besi L.02 OH 1.050 Kepala Tukang L.03 OH 0.262 Mandor L.04 OH 0.265 Jumlah Tenaga Kerja B BAHAN M³ Kayu kelas III 0.200 Paku 5-12 cm Kg 1.500 Minyak bekisting Liter 0.400 Besi beton Kg 157.500 Kawat beton Kg 2.250

0.00

187,619.12

187,619.12 28,142.87 215,761.99

80,000.00 90,000.00 90,000.00 90,000.00 100,000.00 110,000.00

424,000.00 24,750.00 117,000.00 94,500.00 26,200.00 29,150.00 715,600.00

5,583,300.00 16,400.00 24,000.00 9,200.00 20,000.00

1,116,660.00 24,600.00 9,600.00 1,449,000.00 45,000.00

NO

URAIAN

KODE

SAT

2

3

4 Kg M³ M³

1 Semen Portland Pasir beton Kerikil

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 336.000 1,145.00 384,720.00 0.540 265,000.00 143,100.00 0.810 306,000.00 247,860.00 Jumlah Harga Bahan 3,420,540.00 KOEFISIEN

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

4,136,140.00

4,136,140.00 620,421.00 4,756,561.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.1.1.29 Membuat 1 M³ sloof beton bertulang (200 Kg besi + Bekisting) A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Tukang Kayu L.02 OH Tukang Besi L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Kayu kelas III Paku 5-12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir beton Kerikil

M³ Kg Liter Kg Kg Kg M³ M³

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

5.650 0.275 1.560 1.400 0.323 0.283 Jumlah Tenaga Kerja

80,000.00 90,000.00 90,000.00 90,000.00 100,000.00 110,000.00

452,000.00 24,750.00 140,400.00 126,000.00 32,300.00 31,130.00 806,580.00

0.270 2.000 0.600 210.000 3.000 336.000 0.540 0.810 Jumlah Harga Bahan

5,583,300.00 16,400.00 24,000.00 9,200.00 20,000.00 1,145.00 265,000.00 306,000.00

1,507,491.00 32,800.00 14,400.00 1,932,000.00 60,000.00 384,720.00 143,100.00 247,860.00 4,322,371.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.1.1.30 Membuat 1 M³ sloof kolom beton bertulang (300 Kg besi + Bekisting) A TENAGA Pekerja L.01 OH 7.050 Tukang Batu L.02 OH 0.275 Tukang Kayu L.02 OH 1.650 Tukang Besi L.02 OH 2.100 Kepala Tukang L.03 OH 0.403 Mandor L.04 OH 0.353 Jumlah Tenaga Kerja B BAHAN Kayu kelas III M³ 0.400 Paku 5-12 cm Kg 4.000 Minyak bekisting Liter 2.000 Besi beton polos Kg 315.000 Kawat beton Kg 4.500 Semen Portland Kg 336.000 Pasir beton M³ 0.540 M³ Kerikil 0.810 Kayu kelas II balok M³ 0.150 Plywood 9 mm Lbr 3.500 Dolken kayu Ø (8-10) cm, Panj 4 m Batang 20.000 Jumlah Harga Bahan C PERALATAN

0.00

5,128,951.00

80,000.00 90,000.00 90,000.00 90,000.00 100,000.00 110,000.00

564,000.00 24,750.00 148,500.00 189,000.00 40,300.00 38,830.00 1,005,380.00

5,583,300.00 16,400.00 24,000.00 9,200.00 20,000.00 1,145.00 265,000.00 306,000.00 5,500,000.00 93,300.00 25,000.00

2,233,320.00 65,600.00 48,000.00 2,898,000.00 90,000.00 384,720.00 143,100.00 247,860.00 825,000.00 326,550.00 500,000.00 7,762,150.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

5,128,951.00 769,342.65 5,898,293.65

0.00

8,767,530.00

8,767,530.00 1,315,129.50 10,082,659.50

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.1.1.31 Membuat 1 M³ balok beton bertulang (200 Kg besi + Bekisting) A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Tukang Kayu L.02 OH Tukang Besi L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Kayu kelas III Paku 5-12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir beton Kerikil Kayu kelas II balok Plywood 9 mm Dolken kayu Ø (8-10) cm, Panj 4 m

M³ Kg Liter Kg Kg Kg M³ M³ M³ Lbr Batang

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

6.350 0.275 1.650 1.400 0.333 0.318 Jumlah Tenaga Kerja

80,000.00 90,000.00 90,000.00 90,000.00 100,000.00 110,000.00

508,000.00 24,750.00 148,500.00 126,000.00 33,300.00 34,980.00 875,530.00

0.320 3.200 1.600 210.000 3.000 336.000 0.540 0.810 0.140 2.800 16.000 Jumlah Harga Bahan

5,583,300.00 16,400.00 24,000.00 9,200.00 20,000.00 1,145.00 265,000.00 306,000.00 5,500,000.00 93,300.00 25,000.00

1,786,656.00 52,480.00 38,400.00 1,932,000.00 60,000.00 384,720.00 143,100.00 247,860.00 770,000.00 261,240.00 400,000.00 6,076,456.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.1.1.32 Membuat 1 M³ kolom, beton bertulang (150 Kg besi + Bekisting) A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Tukang Kayu L.02 OH Tukang Besi L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Kayu kelas III Paku 5-12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir beton Kerikil Kayu kelas II balok Plywood 9 mm Dolken kayu Ø (8-10) cm, Panj 4 m

M³ Kg Liter Kg Kg Kg M³ M³ M³ Lbr Batang

0.00

6,951,986.00

6,951,986.00 1,042,797.90 7,994,783.90

5.300 0.275 1.300 1.050 0.265 0.265 Jumlah Tenaga Kerja

80,000.00 90,000.00 90,000.00 90,000.00 100,000.00 110,000.00

424,000.00 24,750.00 117,000.00 94,500.00 26,500.00 29,150.00 715,900.00

0.320 3.200 1.600 157.500 2.250 336.000 0.540 0.810 0.120 2.800 32.000 Jumlah Harga Bahan

5,583,300.00 16,400.00 24,000.00 9,200.00 20,000.00 1,145.00 265,000.00 306,000.00 5,500,000.00 93,300.00 25,000.00

1,786,656.00 52,480.00 38,400.00 1,449,000.00 45,000.00 384,720.00 143,100.00 247,860.00 660,000.00 261,240.00 800,000.00 5,868,456.00

C PERALATAN Jumlah Harga Alat

0.00

NO 1

URAIAN 2 D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

HARGA SATUAN (Rp.) 6 6,584,356.00

JUMLAH HARGA (Rp.) 7 6,584,356.00 987,653.40 7,572,009.40

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.1.1.33 Membuat 1 M³ dinding beton bertulang (150 Kg besi + Bekisting) A TENAGA Pekerja L.01 OH 5.300 Tukang Batu L.02 OH 0.275 Tukang Kayu L.02 OH 1.300 Tukang Besi L.02 OH 1.050 Kepala Tukang L.03 OH 0.262 Mandor L.04 OH 0.265 Jumlah Tenaga Kerja B BAHAN Kayu kelas III M³ 0.240 Paku 5-12 cm Kg 3.200 Minyak bekisting Liter 1.600 Besi beton polos Kg 157.500 Kawat beton Kg 2.250 Semen Portland Kg 336.000 Pasir beton M³ 0.540 Kerikil M³ 0.810 Kayu kelas II balok M³ 0.160 Plywood 9 mm Lbr 2.800 Dolken kayu Ø (8-10) cm, Panj 4 m Batang 24.000 Jumlah Harga Bahan C PERALATAN

15%

A.4.1.1.34 Membuat 1 M³ dinding beton bertulang (200 Kg besi + Bekisting) A TENAGA Pekerja L.01 OH 5.650 Tukang Batu L.02 OH 0.275 Tukang Kayu L.02 OH 1.560 Tukang Besi L.02 OH 1.400 Kepala Tukang L.03 OH 0.323 Mandor L.04 OH 0.283 Jumlah Tenaga Kerja B BAHAN Kayu kelas III M³ 0.250 Paku 5-12 cm Kg 3.000 Minyak bekisting Liter 1.200 Besi beton polos Kg 210.000 Kawat beton Kg 3.000 Semen Portland Kg 336.000 M³ Pasir beton 0.540 Kerikil M³ 0.810 Kayu kelas II balok M³ 0.105 Plywood 9 mm Lbr 2.500 Dolken kayu Ø (8-10) cm, Panj 4 m Batang 14.000 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat

7

80,000.00 90,000.00 90,000.00 90,000.00 100,000.00 110,000.00

424,000.00 24,750.00 117,000.00 94,500.00 26,200.00 29,150.00 715,600.00

5,583,300.00 16,400.00 24,000.00 9,200.00 20,000.00 1,145.00 265,000.00 306,000.00 5,500,000.00 93,300.00 25,000.00

1,339,992.00 52,480.00 38,400.00 1,449,000.00 45,000.00 384,720.00 143,100.00 247,860.00 880,000.00 261,240.00 600,000.00 5,441,792.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

6,157,392.00

6,157,392.00 923,608.80 7,081,000.80

80,000.00 90,000.00 90,000.00 90,000.00 100,000.00 110,000.00

452,000.00 24,750.00 140,400.00 126,000.00 32,300.00 31,130.00 806,580.00

5,583,300.00 16,400.00 24,000.00 9,200.00 20,000.00 1,145.00 265,000.00 306,000.00 5,500,000.00 93,300.00 25,000.00

1,395,825.00 49,200.00 28,800.00 1,932,000.00 60,000.00 384,720.00 143,100.00 247,860.00 577,500.00 233,250.00 350,000.00 5,402,255.00

0.00

NO 1

URAIAN 2 D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

HARGA SATUAN (Rp.) 6 6,208,835.00

JUMLAH HARGA (Rp.) 7 6,208,835.00 931,325.25 7,140,160.25

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.1.1.35 Membuat 1 M' kolom praktis beton bertulang (11 X 11) cm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Tukang Kayu L.02 OH Tukang Besi L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Kayu kelas III Paku 5-12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir beton Kerikil

M³ Kg Liter Kg Kg Kg M³ M³

HARGA SATUAN (Rp.) 6

0.180 0.020 0.020 0.020 0.006 0.009 Jumlah Tenaga Kerja 0.020 0.010 3.000 0.450 4.000 0.006 0.009 Jumlah Harga Bahan

JUMLAH HARGA (Rp.) 7

80,000.00 90,000.00 90,000.00 90,000.00 100,000.00 110,000.00

14,400.00 1,800.00 1,800.00 1,800.00 600.00 990.00 21,390.00

5,583,300.00 16,400.00 24,000.00 9,200.00 20,000.00 1,145.00 265,000.00 306,000.00

111,666.00 164.00 0.00 27,600.00 9,000.00 4,580.00 1,590.00 2,754.00 157,354.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.1.1.36 Membuat 1 M' ring balok beton bertulang (10 X 15) cm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Tukang Kayu L.02 OH Tukang Besi L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Kayu kelas III Paku 5-12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir beton Kerikil

M³ Kg Liter Kg Kg Kg M³ M³

0.00

178,744.00

0.297 0.033 0.033 0.033 0.010 0.015 Jumlah Tenaga Kerja 0.003 0.020 3.600 0.050 5.500 0.009 0.015 Jumlah Harga Bahan

178,744.00 26,811.60 205,555.60

80,000.00 90,000.00 90,000.00 90,000.00 100,000.00 110,000.00

23,760.00 2,970.00 2,970.00 2,970.00 1,000.00 1,650.00 35,320.00

5,583,300.00 16,400.00 24,000.00 9,200.00 20,000.00 1,145.00 265,000.00 306,000.00

16,749.90 328.00 0.00 33,120.00 1,000.00 6,297.50 2,385.00 4,590.00 64,470.40

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

99,790.40

99,790.40 14,968.56 114,758.96

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.1.2

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

HARGA SATUAN BETON PRACETAK

A.4.1.2.1 (K3) Membuat 1 M² lahan produksi 8 cm beton mutu f'с = 14,5 Mpa (K175), slump (12 ± 2) cm A TENAGA Pekerja L.01 OH 0.132 80,000.00 Tukang Batu L.02 OH 0.022 90,000.00 Kepala Tukang L.03 OH 0.002 100,000.00 Mandor L.04 OH 0.007 110,000.00 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 26.080 1,145.00 Pasir beton Kg 60.800 189.29 Koral beton Kg 82.320 170.00 Air Liter 17.200 50.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

69,734.57

Jumlah Harga Alat

15%

29,861.60 11,508.57 13,994.40 860.00 56,224.57

0.00

A.4.1.2.2 (K3) Membuat 1 M² lahan produksi tebal 10 cm beton mutu f'с = 14,5 Mpa (K175), slump (12 ± 2) cm A TENAGA Pekerja L.01 OH 0.165 80,000.00 Tukang Batu L.02 OH 0.028 90,000.00 Kepala Tukang L.03 OH 0.003 100,000.00 Mandor L.04 OH 0.008 110,000.00 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 32.600 1,145.00 Pasir beton Kg 76.000 189.29 Koral beton Kg 102.900 170.00 Air Liter 21.500 50.00 Jumlah Harga Bahan C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

10,560.00 1,980.00 200.00 770.00 13,510.00

69,734.57 10,460.19 80,194.76

13,200.00 2,520.00 300.00 880.00 16,900.00 37,327.00 14,385.71 17,493.00 1,075.00 70,280.71

0.00

87,180.71

A.4.1.2.3 (K3) Membuat 1 M² lahan produksi tebal 12 cm beton mutu f'с = 14,5 Mpa (K175), slump (12 ± 2) cm A TENAGA Pekerja L.01 OH 0.198 80,000.00 Tukang Batu L.02 OH 0.033 90,000.00 Kepala Tukang L.03 OH 0.003 100,000.00 Mandor L.04 OH 0.010 110,000.00 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 32.120 1,145.00 Pasir beton Kg 91.200 189.29 Koral beton Kg 123.480 170.00 Air Liter 25.800 50.00 Jumlah Harga Bahan

87,180.71 13,077.11 100,257.82

15,840.00 2,970.00 300.00 1,100.00 20,210.00 36,777.40 17,262.85 20,991.60 1,290.00 76,321.85

NO 1

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

96,531.85

96,531.85 14,479.78 111,011.63

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.1.2.4 (K3) Membuat 1 M² lahan produksi tebal 15 cm beton mutu f'с = 14,5 Mpa (K175), slump (12 ± 2) cm A TENAGA Pekerja L.01 OH 0.248 80,000.00 Tukang Batu L.02 OH 0.041 90,000.00 Kepala Tukang L.03 OH 0.004 100,000.00 Mandor L.04 OH 0.013 110,000.00 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 48.900 1,145.00 Pasir beton Kg 114.000 189.29 Koral beton Kg 154.350 170.00 Air Liter 32.250 50.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.1.2.5 (K3) Pembuatan 1 M² bekesting untuk plat beton pracetak (5 kali pakai) A TENAGA Pekerja L.01 OH 0.007 Tukang Batu L.02 OH 0.076 Kepala Tukang L.03 OH 0.008 Mandor L.04 OH 0.001 Jumlah Tenaga Kerja B BAHAN Lantai kerja tebal 10 cm M³ 0.080 Besi hollow 50.50.3 Kg 9.394 Kayu kaso 5/7 M³ 0.005 Phenol film 12 mm Lembar 0.080 Minyak bekisting Liter 0.200 Dinabolt dia 12 mm (10-15cm) Buah 3.882 Jumlah Harga Bahan C PERALATAN

15%

A.4.1.2.6 Pembuatan 1 M² bekesting untuk balok beton pracetak (10-12 kali pakai) A TENAGA Pekerja L.01 OH 0.004 Tukang Batu L.02 OH 0.038 Kepala Tukang L.03 OH 0.004 Mandor L.04 OH 0.001 Jumlah Tenaga Kerja B BAHAN Kayu kaso 5/7 M³ 0.005 Phenol film 12 mm Lembar 0.043 Minyak bekisting Liter 0.200 Dinabolt dia 12 mm (10-15cm) Buah 0.693 Jumlah Harga Bahan C PERALATAN

7

19,840.00 3,690.00 400.00 1,430.00 25,360.00 55,990.50 21,578.57 26,239.50 1,612.50 105,421.07

0.00

130,781.07

130,781.07 19,617.16 150,398.23

80,000.00 90,000.00 100,000.00 110,000.00

560.00 6,840.00 800.00 110.00 8,310.00

850,507.96 15,000.00 24,000.00 -

68,040.63 #VALUE! 75.00 #VALUE! 4,800.00 #VALUE! #VALUE!

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

#VALUE!

#VALUE! #VALUE! #VALUE!

80,000.00 90,000.00 100,000.00 110,000.00

320.00 3,420.00 400.00 110.00 4,250.00

15,000.00 24,000.00 -

75.00 #VALUE! 4,800.00 #VALUE! #VALUE!

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

JUMLAH HARGA (Rp.) 7 0.00

#VALUE!

#VALUE! #VALUE! #VALUE!

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.1.2.7 Pembuatan 1 M² bekesting untuk kolom beton pracetak (10-12 kali pakai) A TENAGA Pekerja L.01 OH 0.004 Tukang Batu L.02 OH 0.038 Kepala Tukang L.03 OH 0.004 Mandor L.04 OH 0.001 Jumlah Tenaga Kerja B BAHAN M³ Kayu kaso 5/7 0.004 Phenol film 12 mm Lembar 0.048 Minyak bekisting Liter 0.200 Paku 5-7 cm Kg 0.046 Dinabolt dia 12 mm (10-15cm) Buah 0.693 Jumlah Harga Bahan C PERALATAN

15%

A.4.1.2.8 Pemasangan dan membuka bekesting 1 buah komponen plat beton pracetak A TENAGA Pekerja L.01 OH 0.053 Tukang Kayu L.02 OH 0.018 Mandor L.04 OH 0.005 Jumlah Tenaga Kerja B BAHAN

7

80,000.00 90,000.00 100,000.00 110,000.00

320.00 3,420.00 400.00 110.00 4,250.00

15,000.00 24,000.00 16,400.00 -

60.00 #VALUE! 4,800.00 754.40 #VALUE! #VALUE!

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

#VALUE!

80,000.00 90,000.00 110,000.00

#VALUE! #VALUE! #VALUE!

4,240.00 1,620.00 550.00 6,410.00

Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.1.2.9 Pemasangan dan membuka bekesting 1 buah komponen balok beton pracetak A TENAGA Pekerja L.01 OH 0.089 Tukang Kayu L.02 OH 0.030 Mandor L.04 OH 0.005 Jumlah Tenaga Kerja B BAHAN

6,410.00

80,000.00 90,000.00 110,000.00

6,410.00 961.50 7,371.50

7,120.00 2,700.00 550.00 10,370.00

Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

10,370.00

10,370.00 1,555.50 11,925.50

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.1.2.10 Pemasangan dan membuka bekesting 1 buah komponen kolom beton pracetak A TENAGA Pekerja L.01 OH 0.071 Tukang Kayu L.02 OH 0.024 Mandor L.04 OH 0.005 Jumlah Tenaga Kerja B BAHAN

80,000.00 90,000.00 110,000.00

JUMLAH HARGA (Rp.) 7

5,680.00 2,160.00 550.00 8,390.00

Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.1.2.11 Penuangan / menebar untuk 1 buah komponen plat pracetak A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Tukang vibrator L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH

15%

0.064 0.244 0.128 0.034 0.073 Jumlah Tenaga Kerja

8,390.00

80,000.00 90,000.00 90,000.00 100,000.00 110,000.00

8,390.00 1,258.50 9,648.50

5,120.00 21,960.00 11,520.00 3,400.00 8,030.00 50,030.00

B BAHAN Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.1.2.12 Penuangan / menebar beton untuk 1 buah komponen balok pracetak A TENAGA Pekerja L.01 OH 0.069 Tukang Batu L.02 OH 0.242 Tukang vibrator L.02 OH 0.138 Kepala Tukang L.03 OH 0.037 Mandor L.04 OH 0.073 Jumlah Tenaga Kerja B BAHAN

50,030.00

80,000.00 90,000.00 90,000.00 100,000.00 110,000.00

50,030.00 7,504.50 57,534.50

5,520.00 21,780.00 12,420.00 3,700.00 8,030.00 51,450.00

Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

51,450.00

51,450.00 7,717.50 59,167.50

NO

URAIAN

KODE

SAT

KOEFISIEN

HARGA SATUAN (Rp.) 6

1 2 3 4 5 A.4.1.2.13 Penuangan / menebar beton untuk 1 buah komponen kolom pracetak A TENAGA Pekerja L.01 OH 0.061 Tukang Batu L.02 OH 0.213 Tukang vibrator L.02 OH 0.122 Kepala Tukang L.03 OH 0.033 Mandor L.04 OH 0.073 Jumlah Tenaga Kerja B BAHAN

80,000.00 90,000.00 90,000.00 100,000.00 110,000.00

JUMLAH HARGA (Rp.) 7

4,880.00 19,170.00 10,980.00 3,300.00 8,030.00 46,360.00

Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.1.2.14 Mendirikan 1 buah komponen plat pracetak A TENAGA Pekerja L.01 Tukang Batu L.02 Tukang erection L.02 Kepala Tukang L.03 Mandor L.04

15%

46,360.00

46,360.00 6,954.00 53,314.00

OH OH OH OH OH

0.067 0.067 0.134 0.067 0.067 Jumlah Tenaga Kerja

80,000.00 90,000.00 90,000.00 100,000.00 110,000.00

5,360.00 6,030.00 12,060.00 6,700.00 7,370.00 37,520.00

B BAHAN Solar

Liter

6.676 Jumlah Harga Bahan

5,700.00

38,053.20 38,053.20

C PERALATAN Sewa Crane Sewa Pipe support

UH UH

0.067 1.100 Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.1.2.15 Mendirikan 1 buah komponen balok pracetak A TENAGA Pekerja L.01 Tukang Batu L.02 Tukang erection L.02 Operator Crane Pembantu operator Crane Kepala Tukang L.03 Mandor L.04

15%

0.00

75,573.20

75,573.20 11,335.98 86,909.18

OH OH OH OH OH OH OH

0.061 0.061 0.122 0.061 0.061 0.061 0.061 Jumlah Tenaga Kerja

80,000.00 90,000.00 90,000.00 150,000.00 100,000.00 100,000.00 110,000.00

4,880.00 5,490.00 10,980.00 9,150.00 6,100.00 6,100.00 6,710.00 49,410.00

B BAHAN Solar

Liter

6.110 Jumlah Harga Bahan

5,700.00

34,827.00 34,827.00

C PERALATAN Sewa Crane Sewa Pipe support

UH UH

0.061 1.100 Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit

15%

0.00

84,237.00

84,237.00 12,635.55

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7 96,872.55

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.1.2.16 Mendirikan 1 buah komponen kolom pracetak A TENAGA Pekerja L.01 Tukang Batu L.02 Tukang erection L.02 Operator Crane Pembantu operator Crane Kepala Tukang L.03 Mandor L.04

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH OH OH OH

0.083 0.083 0.166 0.083 0.083 0.083 0.083 Jumlah Tenaga Kerja

80,000.00 90,000.00 90,000.00 150,000.00 100,000.00 100,000.00 110,000.00

6,640.00 7,470.00 14,940.00 12,450.00 8,300.00 8,300.00 9,130.00 67,230.00

B BAHAN Solar

Liter

8.277 Jumlah Harga Bahan

5,700.00

47,178.90 47,178.90

C PERALATAN Sewa Crane Sewa Pipe support

UH UH

0.083 2.200 Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.1.2.17 Mendirikan 1 buah komponen plat pracetak (± 20 m) A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Operator Crane OH Pembantu operator Crane OH

80,000.00 90,000.00 150,000.00 100,000.00

1,520.00 3,420.00 2,850.00 1,900.00 9,690.00

5,700.00

10,812.90 10,812.90

Liter

1.897 Jumlah Harga Bahan

C PERALATAN Sewa Crane

UH

0.019 Jumlah Harga Alat

15%

A.4.1.2.18 Melangsir 1 buah komponen balok pracetak (± 20 m) A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Operator Crane OH Pembantu operator Crane OH

0.00

20,502.90

20,502.90 3,075.44 23,578.34

0.019 0.038 0.019 0.019 Jumlah Tenaga Kerja

80,000.00 90,000.00 150,000.00 100,000.00

1,520.00 3,420.00 2,850.00 1,900.00 9,690.00

5,700.00

10,812.90 10,812.90

B BAHAN Solar

Liter

1.897 Jumlah Harga Bahan

C PERALATAN Sewa Crane

UH

0.019 Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

114,408.90 17,161.34 131,570.24

114,408.90

0.019 0.038 0.019 0.019 Jumlah Tenaga Kerja

B BAHAN Solar

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

0.00

15%

0.00

20,502.90

20,502.90 3,075.44 23,578.34

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.1.2.19 Melangsir 1 buah komponen kolom pracetak (± 20 m) A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Operator Crane OH Pembantu operator Crane OH

HARGA SATUAN (Rp.) 6

7

0.019 0.038 0.019 0.019 Jumlah Tenaga Kerja

80,000.00 90,000.00 150,000.00 100,000.00

1,520.00 3,420.00 2,850.00 1,900.00 9,690.00

5,700.00

10,812.90 10,812.90

B BAHAN Solar

Liter

1.897 Jumlah Harga Bahan

C PERALATAN Sewa Crane

UH

0.019 Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

15%

0.00

20,502.90

20,502.90 3,075.44 23,578.34

A.4.1.2.20 Bahan 1 M³ grouting campuran A TENAGA 0.00 0.00

Jumlah Tenaga Kerja B BAHAN Semen grout Screening Air

Kg Kg Liter

1200.000 650.000 350.000 Jumlah Harga Bahan

50.00

#VALUE! #VALUE! 17,500.00 #VALUE!

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

A.4.1.2.21 Bahan 1 M³ grouting tidak campuran A TENAGA 0.00 0.00

Jumlah Tenaga Kerja B BAHAN Semen grout Air

Kg Liter

1850.000 400.000 Jumlah Harga Bahan

50.00

#VALUE! 20,000.00 #VALUE!

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.1.2.22 Upah melakukan 1 titik grouting pada join pracetak A TENAGA Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN

15%

0.367 0.074 0.037 Jumlah Tenaga Kerja

0.00

#VALUE!

90,000.00 100,000.00 110,000.00

#VALUE! #VALUE! #VALUE!

33,030.00 7,400.00 4,070.00 44,500.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

44,500.00

44,500.00 6,675.00 51,175.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.1.2.23 Pemasangan 1 titik bekesting join pracetak A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kayu kaso Papan cor Paku 5-7 cm

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.147 0.147 0.015 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

11,760.00 13,230.00 1,500.00 550.00 27,040.00

M³ M³ Kg

0.012 0.004 0.264 Jumlah Harga Bahan

5,500,000.00 860,100.00 16,400.00

66,000.00 3,440.40 4,329.60 73,770.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.1.2.24 Upah 1 titik Join dengan Sling A TENAGA Pekerja Tukang Kayu Tukang Besi Mandor

15%

L.01 L.02 L.03 L.04

OH OH OH OH

0.220 0.220 0.220 0.011 Jumlah Tenaga Kerja

0.00

100,810.00

80,000.00 90,000.00 90,000.00 110,000.00

100,810.00 15,121.50 115,931.50

17,600.00 19,800.00 19,800.00 1,210.00 40,810.00

B BAHAN Jumlah Harga Bahan

0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.2.1

15%

40,810.00

40,810.00 6,121.50 46,931.50

HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

A.4.2.1.1 Pemasangan 1 Kg besi profil A TENAGA Pekerja Tukang las konstruksi Kepala Tukang Mandor B BAHAN Besi profil

L.01 L.02 L.03 L.04

OH OH OH OH

0.060 0.060 0.006 0.003 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

4,800.00 5,400.00 600.00 330.00 11,130.00

Kg

1.150 Jumlah Harga Bahan

13,420.00

15,433.00 15,433.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

26,563.00

26,563.00 3,984.45 30,547.45

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.2.1.2 Pemasangan 1 Kg rangka kuda-kuda baja IWF A TENAGA Pekerja L.01 Tukang las konstruksi L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Besi baja IWF

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.060 0.060 0.006 0.003 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

4,800.00 5,400.00 600.00 330.00 11,130.00

Kg

1.150 Jumlah Harga Bahan

13,420.00

15,433.00 15,433.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.3 Mengerjakan 100 Kg pekerjaan perakitan A TENAGA Pekerja L.01 Tukang Besi L.02 Kepala Tukang L.03 Mandor L.04

15%

0.00

26,563.00

26,563.00 3,984.45 30,547.45

OH OH OH OH

0.100 0.100 0.001 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

8,000.00 9,000.00 100.00 550.00 17,650.00

B BAHAN Solar Minyak pelumas

Liter Liter

1.000 0.100 Jumlah Harga Bahan

5,700.00 24,000.00

5,700.00 2,400.00 8,100.00

C PERALATAN Sewa alat

Jam

0.800 Jumlah Harga Alat

-

#VALUE! #VALUE!

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.2.1.4 Pembuatan 1 M² pintu besi plat baja tebal 2 mm rangkap, rangka baja siku A TENAGA Pekerja L.01 OH 1.050 Tukang las biasa L.02 OH 1.050 Kepala Tukang L.03 OH 0.105 Mandor L.04 OH 0.052 Jumlah Tenaga Kerja B BAHAN Besi siku L 30.30.3 Kg 15.000 Besi plat baja Kg 32.800 Kawat las Kg 0.050 Jumlah Harga Bahan C PERALATAN Sewa alat Jam 0.800 Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

#VALUE! #VALUE! #VALUE!

#VALUE!

80,000.00 90,000.00 100,000.00 110,000.00

84,000.00 94,500.00 10,500.00 5,720.00 194,720.00

13,420.00 13,420.00 31,800.00

201,300.00 440,176.00 1,590.00 643,066.00

-

#VALUE! #VALUE!

#VALUE!

#VALUE! #VALUE! #VALUE!

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik A TENAGA Pekerja L.01 Tukang Besi L.02 Kepala Tukang L.03 Mandor L.04

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.040 0.020 0.002 0.002 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

3,200.00 1,800.00 200.00 220.00 5,420.00

B BAHAN Kawat las listrik Solar Minyak pelumas

Kg Liter Liter

0.400 0.300 0.400 Jumlah Harga Bahan

30,600.00 5,700.00 24,000.00

12,240.00 1,710.00 9,600.00 23,550.00

C PERALATAN Sewa alat

Jam

0.170 Jumlah Harga Alat

-

#VALUE! #VALUE!

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

#VALUE! Las 1 cm

A.4.2.1.6 Pembuatan 1 M² rangka jendela besi scuare tube (25 X 5) cm A TENAGA Pekerja L.01 OH Tukang las L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Besi scuare tube Besi lis kaca (1 x 1) cm Pengelasan

M M cm

#VALUE! #VALUE! #VALUE! #VALUE!

0.650 0.650 0.065 0.032 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

52,000.00 58,500.00 6,500.00 3,520.00 120,520.00

4.760 4.522 20.000 Jumlah Harga Bahan

#VALUE!

#VALUE! #VALUE! #VALUE! #VALUE!

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.7 Pemasangan 1 M² rangka pintu rolling door besi A TENAGA Pekerja L.01 Tukang las L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Pintu gulung besi

15%

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

OH OH OH OH

1.200 1.200 0.120 0.006 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

96,000.00 108,000.00 12,000.00 660.00 216,660.00



1.000 Jumlah Harga Bahan

-

#VALUE! #VALUE!

C PERALATAN 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

#VALUE!

#VALUE! #VALUE! #VALUE!

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.2.1.8 Pemasangan 1 M² pintu lipat ( folding door ) bahan plastik/ PVC A TENAGA Pekerja L.01 OH Tukang L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Pintu lipat



HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

0.440 0.440 0.040 0.020 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

35,200.00 39,600.00 4,000.00 2,200.00 81,000.00

1.000 Jumlah Harga Bahan

-

#VALUE! #VALUE!

C PERALATAN 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.9 Pemasangan 1 M² Sunscreen alluminium A TENAGA Pekerja L.01 Tukang Besi L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Pintu lipat

15%

#VALUE! #VALUE! #VALUE!

#VALUE!

OH OH OH OH

0.080 0.800 0.080 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,400.00 72,000.00 8,000.00 440.00 86,840.00



1.000 Jumlah Harga Bahan

-

#VALUE! #VALUE!

C PERALATAN 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.10 Pemasangan 1 M² rolling door aluminium A TENAGA Pekerja L.01 Tukang khusus aluminium L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Rolling door aluminium

15%

#VALUE!

#VALUE! #VALUE! #VALUE!

OH OH OH OH

1.000 1.000 0.100 0.050 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

80,000.00 90,000.00 10,000.00 5,500.00 185,500.00



1.000 Jumlah Harga Bahan

350,000.00

350,000.00 350,000.00

C PERALATAN 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

535,500.00

535,500.00 80,325.00 615,825.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.2.1.11 Pemasangan 1 M Kusen pintu aluminium A TENAGA Pekerja L.01 Tukang khusus aluminium L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Profil Aluminium Skrup fixer Sealant

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.043 0.043 0.0043 0.0021 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

3,440.00 3,870.00 430.00 231.00 7,971.00

M Buah Tube

1.100 2.000 0.060 Jumlah Harga Bahan

77,000.00 1,000.00 23,100.00

84,700.00 2,000.00 1,386.00 88,086.00

C PERALATAN 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.2.1.12 Pemasangan 1 M² pintu aluminium strip lebar 8 cm A TENAGA Pekerja L.01 OH Tukang khusus aluminium L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Profil Aluminium Aluminium strip

M Buah

96,057.00

96,057.00 14,408.55 110,465.55

0.085 0.085 0.0085 0.0042 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,800.00 7,650.00 850.00 462.00 15,762.00

4.400 14.600 Jumlah Harga Bahan

77,000.00 -

338,800.00 #VALUE! #VALUE!

C PERALATAN 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.13 Pemasangan 1 M² kaca rangka aluminium A TENAGA Pekerja L.01 Tukang khusus aluminium L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Pintu Aluminium Profil kaca Sealant

15%

#VALUE!

#VALUE! #VALUE! #VALUE!

OH OH OH OH

0.085 0.085 0.0090 0.0050 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,800.00 7,650.00 900.00 550.00 15,900.00

M M Tube

4.400 4.500 0.270 Jumlah Harga Bahan

77,000.00 25,000.00 23,100.00

338,800.00 112,500.00 6,237.00 457,537.00

C PERALATAN 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

473,437.00

473,437.00 71,015.55 544,452.55

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.2.1.14 Pemasangan 1 M² venetions dan Vertical blinde A TENAGA Pekerja L.01 Tukang Besi L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN venetion blinds dan vertical blinds (tirai)

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.350 0.350 0.0350 0.0180 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

28,000.00 31,500.00 3,500.00 1,980.00 64,980.00



1.000 Jumlah Harga Bahan

150,000.00

150,000.00 150,000.00

C PERALATAN 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.2.1.15 Pemasangan 1 M² terali besi strip (2x3) mm A TENAGA Pekerja L.01 Tukang las L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Besi strip Pengelasan

214,980.00

214,980.00 32,247.00 247,227.00

OH OH OH OH

1.670 1.670 0.1670 0.0830 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

133,600.00 150,300.00 16,700.00 9,130.00 309,730.00

Kg cm

6.177 27.080 Jumlah Harga Bahan

13,420.00 #VALUE!

82,895.34 #VALUE! #VALUE!

C PERALATAN 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.16 Pemasangan 1 M² kawat nyamuk A TENAGA Pekerja Tukang Besi Kepala Tukang Mandor B BAHAN Kawat nyamuk Pengelasan Baja strip (0,2X2) cm

15%

L.01 L.02 L.03 L.04

#VALUE!

#VALUE! #VALUE! #VALUE!

OH OH OH OH

1.100 0.100 0.0100 0.0050 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

88,000.00 9,000.00 1,000.00 550.00 98,550.00

M² Cm Kg

1.100 11.110 1.716 Jumlah Harga Bahan

18,100.00 #VALUE! 13,420.00

19,910.00 #VALUE! 23,028.72 #VALUE!

C PERALATAN 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

#VALUE!

#VALUE! #VALUE! #VALUE!

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.2.1.17 Pemasangan 1 M² jendela nako & tralis A TENAGA Pekerja L.01 Tukang L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kawat nyamuk Pengelasan Baja strip (0,2X2) cm

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.200 0.200 0.0200 0.0010 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

16,000.00 18,000.00 2,000.00 110.00 36,110.00

M² Cm Kg

1.100 10.000 7.000 Jumlah Harga Bahan

18,100.00 #VALUE! 13,420.00

19,910.00 #VALUE! 93,940.00 #VALUE!

C PERALATAN 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.2.1.18 Pemasangan 1 M' talang datar / jurai bjls 28 lebar 90 cm A TENAGA Pekerja L.01 OH Tukang L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Seng plat Paku 1 cm - 2,5 cm Papan kayu kelas II atau III

M Kg M³

#VALUE!

#VALUE! #VALUE! #VALUE!

0.200 0.200 0.0200 0.0010 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

16,000.00 18,000.00 2,000.00 110.00 36,110.00

1.050 0.015 0.019 Jumlah Harga Bahan

32,800.00 16,400.00 5,583,300.00

34,440.00 246.00 106,082.70 140,768.70

C PERALATAN 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.2.1.19 Pemasangan 1 M talang ½ lingkaran D-15 cm seng plat bjls 30 lebar 45 cm A TENAGA Pekerja L.01 OH 0.150 Tukang L.02 OH 0.300 Kepala Tukang L.03 OH 0.0300 Mandor L.04 OH 0.0080 Jumlah Tenaga Kerja B BAHAN Seng plat M 1.050 Paku 1 cm - 2,5 cm Kg 0.010 Besi strip Kg 0.500 Jumlah Harga Bahan C PERALATAN

176,878.70

80,000.00 90,000.00 100,000.00 110,000.00

12,000.00 27,000.00 3,000.00 880.00 42,880.00

23,700.00 16,400.00 13,420.00

24,885.00 164.00 6,710.00 31,759.00 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit

15%

176,878.70 26,531.80 203,410.50

74,639.00

74,639.00 11,195.85

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7 85,834.85

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.2.1.20 Pemasangan 1 M² rangka besi hollow 1x40.40.2mm, modul 60x120 cm, dinding partisi A TENAGA Pekerja L.01 OH 0.250 Tukang Besi L.02 OH 0.250 Kepala Tukang L.03 OH 0.0250 Mandor L.04 OH 0.0130 Jumlah Tenaga Kerja B BAHAN Rangka metal hollow 40.40.2 mm M' 3.500 Assesoris (perkuatan,las dll) Ls 100% x rangka Jumlah Harga Bahan C PERALATAN

JUMLAH HARGA (Rp.) 7

80,000.00 90,000.00 100,000.00 110,000.00

20,000.00 22,500.00 2,500.00 1,430.00 46,430.00

-

#VALUE! #VALUE! #VALUE! 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.2.1.21 Pemasangan 1 M² rangka besi hollow 1x40.40.2mm, modul 60x60 cm, plafon A TENAGA Pekerja L.01 OH 0.350 Tukang Besi L.02 OH 0.350 Kepala Tukang L.03 OH 0.0350 Mandor L.04 OH 0.0180 Jumlah Tenaga Kerja B BAHAN Rangka metal hollow 40.40.2 mm M' 4.000 Assesoris (perkuatan,las dll) Ls 100% x rangka Jumlah Harga Bahan C PERALATAN

#VALUE! #VALUE! #VALUE!

#VALUE!

80,000.00 90,000.00 100,000.00 110,000.00

28,000.00 31,500.00 3,500.00 1,980.00 64,980.00

-

#VALUE! #VALUE! #VALUE! 0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.2.1.22 (K3) Pemasangan 1 M² atap pelana rangka atap baja canai dingin profil C75 A TENAGA Pekerja L.01 OH 0.734 Tukang Besi L.02 OH 0.734 Kepala Tukang L.03 OH 0.0734 Mandor L.04 OH 0.0370 Jumlah Tenaga Kerja B BAHAN Baja ringan canai dingin C75 M' 3.065 Jumlah Harga Bahan C PERALATAN Peralatan % 10.000 Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.2.1.23 (K3) Pemasangan 1 M² atap jurai rangka atap baja canai dingin profil C75 A TENAGA

#VALUE! #VALUE! #VALUE!

#VALUE!

80,000.00 90,000.00 100,000.00 110,000.00

58,720.00 66,060.00 7,340.00 4,070.00 136,190.00

-

#VALUE! #VALUE!

#VALUE!

#VALUE! #VALUE!

#VALUE!

#VALUE! #VALUE! #VALUE!

NO

URAIAN

KODE

SAT

2

3 L.01 L.02 L.03 L.04

4 OH OH OH OH

1 Pekerja Tukang Besi Kepala Tukang Mandor

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.760 80,000.00 60,832.00 0.760 90,000.00 68,436.00 0.0760 100,000.00 7,600.00 0.0380 110,000.00 4,180.00 Jumlah Tenaga Kerja 141,048.00 KOEFISIEN

B BAHAN Baja ringan canai dingin C75

M'

4.050 Jumlah Harga Bahan

0.00

0.00 0.00

C PERALATAN Peralatan

%

10.000 Jumlah Harga Alat

0.00

0.00 0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

141,048.00

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING A.4.4.1.1 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP A TENAGA Pekerja L.01 OH 0.600 80,000.00 Tukang Batu L.02 OH 0.200 90,000.00 Kepala Tukang L.03 OH 0.020 100,000.00 Mandor L.04 OH 0.030 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 140.000 650.00 Semen portland Kg 43.500 1,145.00 M³ Pasir Pasang 0.080 265,000.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

141,048.00 21,157.20 162,205.20

48,000.00 18,000.00 2,000.00 3,300.00 71,300.00 91,000.00 49,807.50 21,200.00 162,007.50

0.00

233,307.50

233,307.50 34,996.12 268,303.62

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.4.1.2 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP A TENAGA Pekerja L.01 OH 0.600 80,000.00 Tukang Batu L.02 OH 0.200 90,000.00 Kepala Tukang L.03 OH 0.020 100,000.00 Mandor L.04 OH 0.030 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 140.000 650.00 Semen portland Kg 32.950 1,145.00 Pasir Pasang M³ 0.091 265,000.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

224,142.75

Jumlah Harga Alat

15%

217,344.75

Jumlah Harga Alat

15%

48,000.00 18,000.00 2,000.00 3,300.00 71,300.00 91,000.00 37,727.75 24,115.00 152,842.75

224,142.75 33,621.41 257,764.16

48,000.00 18,000.00 2,000.00 3,300.00 71,300.00 91,000.00 30,399.75 24,645.00 146,044.75

0.00

A.4.4.1.4 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP A TENAGA Pekerja L.01 OH 0.600 80,000.00 Tukang Batu L.02 OH 0.200 90,000.00 Kepala Tukang L.03 OH 0.020 100,000.00 Mandor L.04 OH 0.030 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 140.000 650.00 Semen portland Kg 22.200 1,145.00 Pasir Pasang M³ 0.102 265,000.00 Jumlah Harga Bahan C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit

7

0.00

A.4.4.1.3 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP A TENAGA Pekerja L.01 OH 0.600 80,000.00 Tukang Batu L.02 OH 0.200 90,000.00 Kepala Tukang L.03 OH 0.020 100,000.00 Mandor L.04 OH 0.030 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 140.000 650.00 Semen portland Kg 26.550 1,145.00 Pasir Pasang M³ 0.093 265,000.00 Jumlah Harga Bahan C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

217,344.75 32,601.71 249,946.46

48,000.00 18,000.00 2,000.00 3,300.00 71,300.00 91,000.00 25,419.00 27,030.00 143,449.00

0.00

214,749.00

214,749.00 32,212.35

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7 246,961.35

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.4.1.5 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP A TENAGA Pekerja L.01 OH 0.600 80,000.00 Tukang Batu L.02 OH 0.200 90,000.00 Kepala Tukang L.03 OH 0.020 100,000.00 Mandor L.04 OH 0.030 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 140.000 650.00 Semen portland Kg 18.500 1,145.00 Pasir Pasang M³ 0.122 265,000.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

215,812.50

Jumlah Harga Alat

15%

D Jumlah (A+B+C)

48,000.00 18,000.00 2,000.00 3,300.00 71,300.00 91,000.00 21,182.50 32,330.00 144,512.50

215,812.50 32,371.87 248,184.37

48,000.00 18,000.00 2,000.00 3,300.00 71,300.00 91,000.00 11,541.60 0.00 24,512.50 127,054.10

0.00

198,354.10

A.4.4.1.7 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 2 PP A TENAGA Pekerja L.01 OH 0.300 80,000.00 Tukang Batu L.02 OH 0.100 90,000.00 Kepala Tukang L.03 OH 0.010 100,000.00 Mandor L.04 OH 0.015 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 70.000 650.00 Semen portland Kg 18.950 1,145.00 Pasir Pasang M³ 0.0380 265,000.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat

7

0.00

A.4.4.1.6 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 KP : 10 PP A TENAGA Pekerja L.01 OH 0.600 80,000.00 Tukang Batu L.02 OH 0.200 90,000.00 Kepala Tukang L.03 OH 0.020 100,000.00 Mandor L.04 OH 0.030 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 140.000 650.00 Semen portland Kg 10.080 1,145.00 Kapur Pasang padam M³ 0.0275 Pasir Pasang M³ 0.0925 265,000.00 Jumlah Harga Bahan C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

198,354.10 29,753.11 228,107.21

24,000.00 9,000.00 1,000.00 1,650.00 35,650.00 45,500.00 21,697.75 10,070.00 77,267.75

0.00 112,917.75

NO 1

URAIAN 2 E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

HARGA SATUAN (Rp.) 6 112,917.75

JUMLAH HARGA (Rp.) 7 16,937.66 129,855.41

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.4.1.8 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 3 PP A TENAGA Pekerja L.01 OH 0.300 80,000.00 Tukang Batu L.02 OH 0.100 90,000.00 Kepala Tukang L.03 OH 0.010 100,000.00 Mandor L.04 OH 0.015 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 70.000 650.00 Semen portland Kg 14.370 1,145.00 Pasir Pasang M³ 0.0400 265,000.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

108,203.65

Jumlah Harga Alat

15%

105,712.50

Jumlah Harga Alat

15%

24,000.00 9,000.00 1,000.00 1,650.00 35,650.00 45,500.00 16,453.65 10,600.00 72,553.65

108,203.65 16,230.54 124,434.19

24,000.00 9,000.00 1,000.00 1,650.00 35,650.00 45,500.00 13,167.50 11,395.00 70,062.50

0.00

A.4.4.1.10 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 5 PP A TENAGA Pekerja L.01 OH 0.300 80,000.00 Tukang Batu L.02 OH 0.100 90,000.00 Kepala Tukang L.03 OH 0.010 100,000.00 Mandor L.04 OH 0.015 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 70.000 650.00 Semen portland Kg 9.680 1,145.00 Pasir Pasang M³ 0.0450 265,000.00 Jumlah Harga Bahan C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit

7

0.00

A.4.4.1.9 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 4 PP A TENAGA Pekerja L.01 OH 0.300 80,000.00 Tukang Batu L.02 OH 0.100 90,000.00 Kepala Tukang L.03 OH 0.010 100,000.00 Mandor L.04 OH 0.015 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 70.000 650.00 Semen portland Kg 11.500 1,145.00 Pasir Pasang M³ 0.0430 265,000.00 Jumlah Harga Bahan C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

105,712.50 15,856.87 121,569.37

24,000.00 9,000.00 1,000.00 1,650.00 35,650.00 45,500.00 11,083.60 11,925.00 68,508.60

0.00

104,158.60

104,158.60 15,623.79

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7 119,782.39

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.4.1.11 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 6 PP A TENAGA Pekerja L.01 OH 0.300 80,000.00 Tukang Batu L.02 OH 0.100 90,000.00 Kepala Tukang L.03 OH 0.010 100,000.00 Mandor L.04 OH 0.015 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 70.000 650.00 Semen portland Kg 8.320 1,145.00 Pasir Pasang M³ 0.0490 265,000.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

103,661.40

Jumlah Harga Alat

15%

D Jumlah (A+B+C)

24,000.00 9,000.00 1,000.00 1,650.00 35,650.00 45,500.00 9,526.40 12,985.00 68,011.40

103,661.40 15,549.21 119,210.61

24,000.00 9,000.00 1,000.00 1,650.00 35,650.00 45,500.00 7,442.50 13,250.00 66,192.50

0.00

101,842.50

A.4.4.1.13 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 3 KP : 10 PP A TENAGA Pekerja L.01 OH 0.300 80,000.00 Tukang Batu L.02 OH 0.100 90,000.00 Kepala Tukang L.03 OH 0.010 100,000.00 Mandor L.04 OH 0.015 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 70.000 650.00 Semen portland Kg 4.500 1,145.00 Kapur Pasang padam M³ 0.015 Pasir Pasang M³ 0.0500 265,000.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat

7

0.00

A.4.4.1.12 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 8 PP A TENAGA Pekerja L.01 OH 0.300 80,000.00 Tukang Batu L.02 OH 0.100 90,000.00 Kepala Tukang L.03 OH 0.010 100,000.00 Mandor L.04 OH 0.015 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 70.000 650.00 Semen portland Kg 6.500 1,145.00 Pasir Pasang M³ 0.0500 265,000.00 Jumlah Harga Bahan C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

101,842.50 15,276.37 117,118.87

24,000.00 9,000.00 1,000.00 1,650.00 35,650.00 45,500.00 5,152.50 0.00 13,250.00 63,902.50

0.00 99,552.50

NO 1

URAIAN 2 E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

HARGA SATUAN (Rp.) 6 99,552.50

JUMLAH HARGA (Rp.) 7 14,932.87 114,485.37

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.4.1.14 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SM : 1 KP : 1 PP A TENAGA Pekerja L.01 OH 0.300 80,000.00 Tukang Batu L.02 OH 0.100 90,000.00 Kepala Tukang L.03 OH 0.010 100,000.00 Mandor L.04 OH 0.015 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 70.000 650.00 Semen merah Kg 0.018 31,200.00 Kapur Pasang padam M³ 0.018 Pasir Pasang M³ 0.0180 265,000.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

86,481.60

Jumlah Harga Alat

15%

A.4.4.1.16 Pemasangan 1M² dinding conblock HB20 campuran 1 SP : 3 PP A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN HB-20 Semen Porltand Pasir Pasang Besi angker diameter 8

Bh Kg M³ Kg

7

24,000.00 9,000.00 1,000.00 1,650.00 35,650.00 45,500.00 561.60 0.00 4,770.00 50,831.60

0.00

A.4.4.1.15 Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SM : 1 KP : 2 PP A TENAGA Pekerja L.01 OH 0.300 80,000.00 Tukang Batu L.02 OH 0.100 90,000.00 Kepala Tukang L.03 OH 0.010 100,000.00 Mandor L.04 OH 0.015 110,000.00 Jumlah Tenaga Kerja B BAHAN Bata merah Bh 70.000 650.00 Semen merah Kg 0.014 31,200.00 Kapur Pasang padam M³ 0.014 Pasir Pasang M³ 0.0280 265,000.00 Jumlah Harga Bahan C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

86,481.60 12,972.24 99,453.84

24,000.00 9,000.00 1,000.00 1,650.00 35,650.00 45,500.00 436.80 0.00 7,420.00 53,356.80

0.00

89,006.80

89,006.80 13,351.02 102,357.82

0.350 0.150 0.015 0.018 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

28,000.00 13,500.00 1,500.00 1,980.00 44,980.00

12.500 30.320 0.728 0.2800 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 9,200.00

0.00 34,716.40 192,920.00 2,576.00 230,212.40

C PERALATAN Jumlah Harga Alat

0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

HARGA SATUAN (Rp.) 6

275,192.40

JUMLAH HARGA (Rp.) 7 275,192.40 41,278.86 316,471.26

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.1.17 Pemasangan 1M² dinding conblock HB20 campuran 1 SP : 4 PP A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN HB-20 Semen Porltand Pasir Pasang Besi angker diameter 8

Bh Kg M³ Kg

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

0.350 0.150 0.015 0.018 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

28,000.00 13,500.00 1,500.00 1,980.00 44,980.00

12.500 24.260 0.772 0.2800 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 9,200.00

0.00 27,777.70 204,580.00 2,576.00 234,933.70

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.1.18 Pemasangan 1M² dinding conblock HB15 campuran 1 SP : 3 PP A TENAGA Pekerja L.01 OH 0.320 Tukang Batu L.02 OH 0.120 Kepala Tukang L.03 OH 0.012 Mandor L.04 OH 0.016 Jumlah Tenaga Kerja B BAHAN HB-15 Bh 12.500 Semen Porltand Kg 22.740 Pasir Pasang M³ 0.550 Besi angker diameter 8 Kg 0.280 Jumlah Harga Bahan C PERALATAN

0.00

279,913.70

80,000.00 90,000.00 100,000.00 110,000.00

25,600.00 10,800.00 1,200.00 1,760.00 39,360.00

0.00 1,145.00 265,000.00 9,200.00

0.00 26,037.30 145,750.00 2,576.00 174,363.30

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.1.19 Pemasangan 1M² dinding conblock HB15 campuran 1 SP : 4 PP A TENAGA Pekerja L.01 OH 0.320 Tukang Batu L.02 OH 0.120 Kepala Tukang L.03 OH 0.012 Mandor L.04 OH 0.016 Jumlah Tenaga Kerja B BAHAN HB-15 Bh 12.500 Semen Porltand Kg 18.200 Pasir Pasang M³ 0.582 Besi angker diameter 8 Kg 0.280 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat

279,913.70 41,987.05 321,900.75

0.00

213,723.30

213,723.30 32,058.49 245,781.79

80,000.00 90,000.00 100,000.00 110,000.00

25,600.00 10,800.00 1,200.00 1,760.00 39,360.00

0.00 1,145.00 265,000.00 9,200.00

0.00 20,839.00 154,230.00 2,576.00 177,645.00

0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

HARGA SATUAN (Rp.) 6

217,005.00

JUMLAH HARGA (Rp.) 7 217,005.00 32,550.75 249,555.75

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.4.1.20 Pemasangan 1M² dinding conblock HB10 campuran 1 SP : 3 PP A TENAGA Pekerja L.01 OH 0.300 Tukang Batu L.02 OH 0.100 Kepala Tukang L.03 OH 0.010 Mandor L.04 OH 0.015 Jumlah Tenaga Kerja B BAHAN HB-10 Bh 12.500 Semen Porltand Kg 15.160 Pasir Pasang M³ 0.364 Besi angker diameter 8 Kg 0.280 Jumlah Harga Bahan C PERALATAN

15%

A.4.4.1.21 Pemasangan 1M² dinding conblock HB10 campuran 1 SP : 4 PP A TENAGA Pekerja L.01 OH 0.300 Tukang Batu L.02 OH 0.100 Kepala Tukang L.03 OH 0.010 Mandor L.04 OH 0.015 Jumlah Tenaga Kerja B BAHAN HB-10 Bh 12.500 Semen Porltand Kg 12.130 Pasir Pasang M³ 0.388 Besi angker diameter 8 Kg 0.280 Jumlah Harga Bahan C PERALATAN

24,000.00 9,000.00 1,000.00 1,650.00 35,650.00

0.00 1,145.00 265,000.00 9,200.00

0.00 17,358.20 96,460.00 2,576.00 116,394.20

0.00

152,044.20

15%

A.4.4.1.22 Pemasangan 1M² dinding terawang(rooster) 12x11x24 campuran 1 SP : 3 PP A TENAGA Pekerja L.01 OH 0.300 Tukang Batu L.02 OH 0.100 Kepala Tukang L.03 OH 0.010 Mandor L.04 OH 0.015 Jumlah Tenaga Kerja B BAHAN Bata rooster Bh 30.000 Semen Porltand Kg 11.000 Pasir Pasang M³ 0.035 Jumlah Harga Bahan C PERALATAN

152,044.20 22,806.63 174,850.83

80,000.00 90,000.00 100,000.00 110,000.00

24,000.00 9,000.00 1,000.00 1,650.00 35,650.00

0.00 1,145.00 265,000.00 9,200.00

0.00 13,888.85 102,820.00 2,576.00 119,284.85

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

80,000.00 90,000.00 100,000.00 110,000.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

154,934.85

154,934.85 23,240.22 178,175.07

80,000.00 90,000.00 100,000.00 110,000.00

24,000.00 9,000.00 1,000.00 1,650.00 35,650.00

0.00 1,145.00 265,000.00

0.00 12,595.00 9,275.00 21,870.00

NO

URAIAN

KODE

SAT

1

2

3

4

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KOEFISIEN 5 Jumlah Harga Alat

15%

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7 0.00

57,520.00

57,520.00 8,628.00 66,148.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.4.1.23 Pemasangan 1M² dinding terawang(rooster) 12x11x24 campuran 1 SP : 4 PP A TENAGA Pekerja L.01 OH 0.300 Tukang Batu L.02 OH 0.100 Kepala Tukang L.03 OH 0.010 Mandor L.04 OH 0.015 Jumlah Tenaga Kerja B BAHAN Bata berongga Bh 30.000 Semen Porltand Kg 11.000 Pasir Pasang M³ 0.035 Jumlah Harga Bahan C PERALATAN

15%

A.4.4.1.24 Pemasangan 1M² dinding bata berongga ekspose 12x11x24 campuran 1 SP : 3 PP A TENAGA Pekerja L.01 OH 0.300 Tukang Batu L.02 OH 0.150 Kepala Tukang L.03 OH 0.015 Mandor L.04 OH 0.015 Jumlah Tenaga Kerja B BAHAN Bata rooster Bh 70.000 Semen Porltand Kg 14.000 Pasir Pasang M³ 0.032 Jumlah Harga Bahan C PERALATAN

24,000.00 9,000.00 1,000.00 1,650.00 35,650.00

0.00 1,145.00 265,000.00

0.00 12,595.00 9,275.00 21,870.00

0.00

57,520.00

15%

A.4.4.1.25 Pemasangan 1M² dinding bata ringan tebal 7.5 cm dengan mortar siap pakai A TENAGA Pekerja L.01 OH 0.670 Tukang Batu L.02 OH 1.300 Kepala Tukang L.03 OH 0.130 Mandor L.04 OH 0.003 Jumlah Tenaga Kerja B BAHAN Bata ringan tebal 7.5 cm Bh 8.400 Mortar siap pakai Kg 0.473 Jumlah Harga Bahan C PERALATAN Peralatan % 10.000 Jumlah Harga Alat D Jumlah (A+B+C)

57,520.00 8,628.00 66,148.00

80,000.00 90,000.00 100,000.00 110,000.00

24,000.00 13,500.00 1,500.00 1,650.00 40,650.00

0.00 1,145.00 265,000.00

0.00 16,030.00 8,480.00 24,510.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

80,000.00 90,000.00 100,000.00 110,000.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

65,160.00

65,160.00 9,774.00 74,934.00

80,000.00 90,000.00 100,000.00 110,000.00

53,600.00 117,000.00 13,000.00 330.00 183,930.00

8,900.00 0.00

74,760.00 0.00 74,760.00 890.00 890.00 259,580.00

NO 1

URAIAN 2 E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

HARGA SATUAN (Rp.) 6 259,580.00

A.4.4.1.26 Pemasangan 1M² dinding bata ringan tebal 10 cm dengan mortar siap pakai A TENAGA Pekerja L.01 OH 0.670 Tukang Batu L.02 OH 1.300 Kepala Tukang L.03 OH 0.130 Mandor L.04 OH 0.003 Jumlah Tenaga Kerja B BAHAN Bata ringan tebal 10 cm Bh 8.400 Mortar siap pakai Kg 0.063 Jumlah Harga Bahan C PERALATAN Peralatan % 10.000 Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN A.4.4.2.1 Pemasangan 1M² plesteran campuran 1 SP : 1 PP : A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Semen portland Pasir Pasang

15%

JUMLAH HARGA (Rp.) 7 38,937.00 298,517.00

80,000.00 90,000.00 100,000.00 110,000.00

53,600.00 117,000.00 13,000.00 330.00 183,930.00

8,900.00 0.00

74,760.00 0.00 74,760.00 890.00 890.00

259,580.00

259,580.00 38,937.00 298,517.00

tebal 15 mm OH OH OH OH

0.300 0.150 0.015 0.015 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

24,000.00 13,500.00 1,500.00 1,650.00 40,650.00

Kg M³

15.504 0.016 Jumlah Harga Bahan

1,145.00 265,000.00

17,752.08 4,240.00 21,992.08

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

62,642.08

62,642.08 9,396.31 72,038.39

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.2.2 Pemasangan 1M² plesteran campuran 1 SP : 2 PP : A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Semen portland Pasir Pasang

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

tebal 15 mm OH OH OH OH

0.300 0.150 0.015 0.015 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

24,000.00 13,500.00 1,500.00 1,650.00 40,650.00

Kg M³

10.224 0.020 Jumlah Harga Bahan

1,145.00 265,000.00

11,706.48 5,300.00 17,006.48

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.4.2.3 Pemasangan 1M² plesteran campuran 1 SP : 3 PP : A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Semen portland Pasir Pasang

15%

0.00

57,656.48

57,656.48 8,648.47 66,304.95

tebal 15 mm OH OH OH OH

0.300 0.150 0.015 0.015 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

24,000.00 13,500.00 1,500.00 1,650.00 40,650.00

Kg M³

7.776 0.023 Jumlah Harga Bahan

1,145.00 265,000.00

8,903.52 6,095.00 14,998.52

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.4.2.4 Pemasangan 1M² plesteran campuran 1 SP : 4 PP : A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Semen portland Pasir Pasang

15%

0.00

55,648.52

55,648.52 8,347.27 63,995.79

tebal 15 mm OH OH OH OH

0.300 0.150 0.015 0.015 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

24,000.00 13,500.00 1,500.00 1,650.00 40,650.00

Kg M³

6.240 0.024 Jumlah Harga Bahan

1,145.00 265,000.00

7,144.80 6,360.00 13,504.80

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

54,154.80

54,154.80 8,123.22 62,278.02

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.2.5 Pemasangan 1M² plesteran campuran 1 SP : 5 PP : A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Semen portland Pasir Pasang

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

tebal 15 mm OH OH OH OH

0.300 0.150 0.015 0.015 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

24,000.00 13,500.00 1,500.00 1,650.00 40,650.00

Kg M³

5.184 0.026 Jumlah Harga Bahan

1,145.00 265,000.00

5,935.68 6,890.00 12,825.68

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.4.2.6 Pemasangan 1M² plesteran campuran 1 SP : 6 PP : A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Semen portland Pasir Pasang

15%

0.00

53,475.68

53,475.68 8,021.35 61,497.03

tebal 15 mm OH OH OH OH

0.300 0.150 0.015 0.015 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

24,000.00 13,500.00 1,500.00 1,650.00 40,650.00

Kg M³

4.416 0.027 Jumlah Harga Bahan

1,145.00 265,000.00

5,056.32 7,155.00 12,211.32

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.4.2.7 Pemasangan 1M² plesteran campuran 1 SP : 7 PP : A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Semen portland Pasir Pasang

15%

0.00

52,861.32

52,861.32 7,929.19 60,790.51

tebal 15 mm OH OH OH OH

0.300 0.150 0.015 0.015 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

24,000.00 13,500.00 1,500.00 1,650.00 40,650.00

Kg M³

3.936 0.028 Jumlah Harga Bahan

1,145.00 265,000.00

4,506.72 7,420.00 11,926.72

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

52,576.72

52,576.72 7,886.50 60,463.22

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.2.8 Pemasangan 1M² plesteran campuran 1 SP : 7 PP : A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Semen portland Pasir Pasang

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

tebal 15 mm OH OH OH OH

0.300 0.150 0.015 0.015 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

24,000.00 13,500.00 1,500.00 1,650.00 40,650.00

Kg M³

3.456 0.029 Jumlah Harga Bahan

1,145.00 265,000.00

3,957.12 7,685.00 11,642.12

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.2.9 Pemasangan 1M² plesteran campuran 1 SP : ½ KP : 3 PP : tebal 15 mm A TENAGA Pekerja L.01 OH 0.360 Tukang Batu L.02 OH 0.120 Kepala Tukang L.03 OH 0.012 Mandor L.04 OH 0.018 Jumlah Tenaga Kerja B BAHAN Semen portland Kg 5.760 M³ Kapur Pasang 0.003 Pasir Pasang M³ 0.013 Jumlah Harga Bahan C PERALATAN

0.00

52,292.12

80,000.00 90,000.00 100,000.00 110,000.00

28,800.00 10,800.00 1,200.00 1,980.00 42,780.00

1,145.00 0.00 265,000.00

6,595.20 0.00 3,445.00 10,040.20

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.4.2.10 Pemasangan 1M² plesteran campuran 1 SP : 2 KP : A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Semen portland Kapur Pasang Pasir Pasang

15%

52,292.12 7,843.81 60,135.93

0.00

52,820.20

52,820.20 7,923.03 60,743.23

8 PP : tebal 15 mm OH OH OH OH

0.360 0.120 0.012 0.018 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

28,800.00 10,800.00 1,200.00 1,980.00 42,780.00

Kg M³ M³

3.000 0.005 0.020 Jumlah Harga Bahan

1,145.00 0.00 265,000.00

3,435.00 0.00 5,300.00 8,735.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit

15%

0.00

51,515.00

51,515.00 7,727.25

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7 59,242.25

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.4.2.11 Pemasangan 1M² plesteran campuran 1 SM : 1 KP : 1 PP : tebal 15 mm A TENAGA Pekerja L.01 OH 0.360 Tukang Batu L.02 OH 0.120 Kepala Tukang L.03 OH 0.012 Mandor L.04 OH 0.018 Jumlah Tenaga Kerja B BAHAN M³ Semen merah 0.009 Kapur Pasang M³ 0.009 Pasir Pasang M³ 0.009 Jumlah Harga Bahan C PERALATAN

15%

A.4.4.2.12 Pemasangan 1M² plesteran campuran 1 SM : 1 KP : 2 PP : tebal 15 mm A TENAGA Pekerja L.01 OH 0.360 Tukang Batu L.02 OH 0.120 Kepala Tukang L.03 OH 0.012 Mandor L.04 OH 0.018 Jumlah Tenaga Kerja B BAHAN Semen merah M³ 0.007 M³ Kapur Pasang 0.007 Pasir Pasang M³ 0.015 Jumlah Harga Bahan C PERALATAN

28,800.00 10,800.00 1,200.00 1,980.00 42,780.00

31,200.00 0.00 265,000.00

280.80 0.00 2,385.00 2,665.80

0.00

45,445.80

15%

45,445.80 6,816.87 52,262.67

80,000.00 90,000.00 100,000.00 110,000.00

28,800.00 10,800.00 1,200.00 1,980.00 42,780.00

31,200.00 0.00 265,000.00

218.40 0.00 3,975.00 4,193.40

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

80,000.00 90,000.00 100,000.00 110,000.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

46,973.40

46,973.40 7,046.01 54,019.41

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.2.13 Pemasangan 1M² plesteran campuran 1 SP : 1 PP : tebal 20 mm A TENAGA Pekerja L.01 OH Tukang Batu Kepala Tukang Mandor

L.02 L.03 L.04

B BAHAN Semen Portland Pasir Pasang

HARGA SATUAN (Rp.) 6

0.400

JUMLAH HARGA (Rp.) 7

80,000.00

32,000.00

OH OH OH

0.200 0.020 0.022 Jumlah Tenaga Kerja

90,000.00 100,000.00 110,000.00

18,000.00 2,000.00 2,420.00 54,420.00

kg M³

13.632 0.027 Jumlah Harga Bahan

1,145.00 265,000.00

15,608.64 7,155.00 22,763.64

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

77,183.64

77,183.64 11,577.54 88,761.18

A.4.4.2.14 Pemasangan 1M² plesteran campuran 1 SP : 3 PP : tebal 20 mm A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

L.01 L.02 L.03 L.04

B BAHAN Semen Portland Pasir Pasang

OH OH OH OH

0.400 0.200 0.020 0.022 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

32,000.00 18,000.00 2,000.00 2,420.00 54,420.00

kg M³

10.368 0.031 Jumlah Harga Bahan

1,145.00 265,000.00

11,871.36 8,215.00 20,086.36

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.4.2.15 Pemasangan 1M² plesteran campuran 1 SP : 4 PP : A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Semen Portland Pasir Pasang

15%

0.00

74,506.36

74,506.36 11,175.95 85,682.31

tebal 20 mm OH OH OH OH

0.400 0.200 0.020 0.022 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

32,000.00 18,000.00 2,000.00 2,420.00 54,420.00

kg M³

8.320 0.032 Jumlah Harga Bahan

1,145.00 265,000.00

9,526.40 8,480.00 18,006.40

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

72,426.40

72,426.40 10,863.96 83,290.36

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.2.16 Pemasangan 1M² plesteran campuran 1 SP : 5 PP : A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Semen Portland Pasir Pasang

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

tebal 20 mm OH OH OH OH

0.400 0.200 0.020 0.022 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

32,000.00 18,000.00 2,000.00 2,420.00 54,420.00

kg M³

6.912 0.035 Jumlah Harga Bahan

1,145.00 265,000.00

7,914.24 9,275.00 17,189.24

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.4.2.17 Pemasangan 1M² plesteran campuran 1 SP : 6 PP : A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Semen Portland Pasir Pasang

15%

0.00

71,609.24

71,609.24 10,741.38 82,350.62

tebal 20 mm OH OH OH OH

0.400 0.200 0.020 0.022 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

32,000.00 18,000.00 2,000.00 2,420.00 54,420.00

kg M³

5.888 0.036 Jumlah Harga Bahan

1,145.00 265,000.00

6,741.76 9,540.00 16,281.76

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.2.18 Pemasangan 1M² plesteran campuran 1 SM : 1 KP : 2 PP tebal 20 mm A TENAGA Pekerja L.01 OH 0.440 Tukang Batu L.02 OH 0.220 Kepala Tukang L.03 OH 0.022 Mandor L.04 OH 0.022 Jumlah Tenaga Kerja B BAHAN Semen merah M³ 0.009 Kapur Pasang M³ 0.009 Pasir Pasang M³ 0.018 Jumlah Harga Bahan C PERALATAN

0.00

70,701.76

80,000.00 90,000.00 100,000.00 110,000.00

35,200.00 19,800.00 2,200.00 2,420.00 59,620.00

31,200.00 0.00 265,000.00

280.80 0.00 4,770.00 5,050.80

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

70,701.76 10,605.26 81,307.02

0.00

64,670.80

64,670.80 9,700.62 74,371.42

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.2.19 Pemasangan 1M² berapen campuran 1 SP : 5 PP tebal 15 mm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Semen Portland Pasir Pasang

Kg M³

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

0.150 0.075 0.008 0.008 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

12,000.00 6,750.00 800.00 880.00 20,430.00

5.184 0.026 Jumlah Harga Bahan

1,145.00 265,000.00

5,935.68 6,890.00 12,825.68

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.2.20 Pemasangan 1M² plesteran skoning campuran 1 SP : 3 PP lebar 10 cm A TENAGA Pekerja L.01 OH 0.080 Tukang Batu L.02 OH 0.400 Kepala Tukang L.03 OH 0.040 Mandor L.04 OH 0.004 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 0.500 M³ Pasir Pasang 0.013 Jumlah Harga Bahan C PERALATAN

0.00

33,255.68

80,000.00 90,000.00 100,000.00 110,000.00

6,400.00 36,000.00 4,000.00 440.00 46,840.00

1,145.00 265,000.00

572.50 3,445.00 4,017.50

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.2.21 Pemasangan 1M² plesteran granit campuran 1 SP : 2 granit tebal 1 cm A TENAGA Pekerja L.01 OH 0.450 Tukang Batu L.02 OH 0.225 Kepala Tukang L.03 OH 0.023 Mandor L.04 OH 0.023 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 10.000 Batu granit Kg 15.000 Jumlah Harga Bahan C PERALATAN

0.00

50,857.50

15%

50,857.50 7,628.62 58,486.12

80,000.00 90,000.00 100,000.00 110,000.00

36,000.00 20,250.00 2,300.00 2,530.00 61,080.00

1,145.00 0.00

11,450.00 0.00 11,450.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

33,255.68 4,988.35 38,244.03

0.00

72,530.00

72,530.00 10,879.50 83,409.50

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.2.22 Pemasangan 1M² plesteran traso 1 SP : 2 traso tebal 1 cm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Semen Portland Batu traso

Kg Kg

HARGA SATUAN (Rp.) 6

0.450 0.225 0.023 0.023 Jumlah Tenaga Kerja 10.000 15.000

JUMLAH HARGA (Rp.) 7

80,000.00 90,000.00 100,000.00 110,000.00

36,000.00 20,250.00 2,300.00 2,530.00 61,080.00

1,145.00 0.00

11,450.00 0.00

Jumlah Harga Bahan

11,450.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.4.2.23 Pemasangan 1M² plesteran ciprat 1 SP : 2 PP A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Semen Portland Pasir Pasang

15%

0.00

72,530.00

72,530.00 10,879.50 83,409.50

OH OH OH OH

0.300 0.100 0.010 0.015 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

24,000.00 9,000.00 1,000.00 1,650.00 35,650.00

Kg M³

4.320 0.006 Jumlah Harga Bahan

1,145.00 265,000.00

4,946.40 1,590.00 6,536.40

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.2.24 Pemasangan 1M² finishing siar pasangan bata merah A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Semen Portland

Kg

0.00

42,186.40

42,186.40 6,327.96 48,514.36

0.150 0.075 0.008 0.008 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

12,000.00 6,750.00 800.00 880.00 20,430.00

3.108 Jumlah Harga Bahan

1,145.00

3,558.66 3,558.66

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

23,988.66

23,988.66 3,598.29 27,586.95

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.2.25 Pemasangan 1M² finishing siar pasangan conblock ekspose A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Semen Portland

Kg

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

0.070 0.035 0.004 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

5,600.00 3,150.00 400.00 440.00 9,590.00

1.600 Jumlah Harga Bahan

1,145.00

1,832.00 1,832.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.2.26 Pemasangan 1M² finishing siar pasangan batu kali, campuran 1 SP : 2 PP A TENAGA Pekerja L.01 OH 0.300 Tukang Batu L.02 OH 0.150 Kepala Tukang L.03 OH 0.015 Mandor L.04 OH 0.015 Jumlah Tenaga Kerja B BAHAN Semen Portland Kg 6.340 M³ Pasir Pasang 0.012 Jumlah Harga Bahan C PERALATAN

0.00

11,422.00

80,000.00 90,000.00 100,000.00 110,000.00

24,000.00 13,500.00 1,500.00 1,650.00 40,650.00

1,145.00 265,000.00

7,259.30 3,180.00 10,439.30

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.4.2.27 Pemasangan 1M² acian. A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor B BAHAN Semen Portland

15%

L.01 L.02 L.03 L.04

11,422.00 1,713.30 13,135.30

0.00

51,089.30

51,089.30 7,663.39 58,752.69

OH OH OH OH

0.200 0.100 0.010 0.010 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

16,000.00 9,000.00 1,000.00 1,100.00 27,100.00

Kg

3.250 Jumlah Harga Bahan

1,145.00

3,721.25 3,721.25

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.4.2.28 Pemasangan 1M² plesteran dengan mortar siap pakai (MSP) A TENAGA

15%

0.00

30,821.25

30,821.25 4,623.18 35,444.43

NO

URAIAN

KODE

SAT

2

3 L.01 L.02 L.03 L.04

4 OH OH OH OH

1 Pekerja Tukang Batu Kepala Tukang Mandor B BAHAN MSP

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 80,000.00 0.00 90,000.00 0.00 100,000.00 0.00 110,000.00 0.00 Jumlah Tenaga Kerja 0.00 KOEFISIEN

Kg Jumlah Harga Bahan

0.00

0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.2.29 Pemasangan 1M² plesteran dengan acian mortar siap pakai (MSP) A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH Jumlah Tenaga Kerja B BAHAN MSP Kg Jumlah Harga Bahan C PERALATAN

-

80,000.00 90,000.00 100,000.00 110,000.00

0.00 0.00 0.00 0.00 0.00

0.00

0.00 0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00 0.00 0.00

0.00

-

0.00 0.00 0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

HARGA SATUAN (Rp.) 6

1 2 3 4 5 A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING A.4.4.3.1 Pemasangan 1M² lantai ubin PC abu-abu ukuran 40cm x 40cm. A TENAGA Pekerja L.01 OH 0.250 Tukang Batu L.02 OH 0.125 Kepala Tukang L.03 OH 0.013 Mandor L.04 OH 0.013 Jumlah Tenaga Kerja B BAHAN Ubin abu-abu Buah 6.630 Semen Portland Kg 9.800 Pasir Pasang M³ 0.045 Jumlah Harga Bahan C PERALATAN

15%

A.4.4.3.2 Pemasangan 1M² lantai ubin PC abu-abu ukuran 30cm x 30cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Ubin abu-abu Semen Portland Pasir Pasang

Buah Kg M³

7

80,000.00 90,000.00 100,000.00 110,000.00

20,000.00 11,250.00 1,300.00 1,430.00 33,980.00

0.00 1,145.00 265,000.00

0.00 11,221.00 11,925.00 23,146.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

57,126.00

57,126.00 8,568.90 65,694.90

0.250 0.125 0.013 0.013 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

20,000.00 11,250.00 1,300.00 1,430.00 33,980.00

11.870 10.000 0.045 Jumlah Harga Bahan

0.00 1,145.00 265,000.00

0.00 11,450.00 11,925.00 23,375.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.3 Pemasangan 1M² lantai ubin PC abu-abu ukuran 20cm x 20cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Ubin abu-abu Semen Portland Pasir Pasang

Buah Kg M³

0.00

57,355.00

57,355.00 8,603.25 65,958.25

0.270 0.135 0.014 0.014 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

21,600.00 12,150.00 1,400.00 1,540.00 36,690.00

26.500 10.400 0.045 Jumlah Harga Bahan

0.00 1,145.00 265,000.00

0.00 11,908.00 11,925.00 23,833.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C)

0.00 60,523.00

NO 1

URAIAN 2 E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

HARGA SATUAN (Rp.) 6 60,523.00

JUMLAH HARGA (Rp.) 7 9,078.45 69,601.45

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.3.4 Pemasangan 1M² lantai ubin warna ukuran 40cm x 40cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Ubin warna Semen Portland Semen warna Pasir Pasang

Buah Kg Kg M³

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

0.250 0.125 0.013 0.013 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

20,000.00 11,250.00 1,300.00 1,430.00 33,980.00

6.630 9.800 1.300 0.045 Jumlah Harga Bahan

8,733.03 1,145.00 8,000.00 265,000.00

57,900.00 11,221.00 10,400.00 11,925.00 91,446.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.5 Pemasangan 1M² lantai ubin warna ukuran 30cm x 30cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Ubin warna Semen Portland Semen warna Pasir Pasang

Buah Kg Kg M³

0.00

125,426.00

125,426.00 18,813.90 144,239.90

0.260 0.130 0.013 0.013 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

20,800.00 11,700.00 1,300.00 1,430.00 35,230.00

11.870 10.000 1.500 0.045 Jumlah Harga Bahan

4,001.68 1,145.00 8,000.00 265,000.00

47,500.00 11,450.00 12,000.00 11,925.00 82,875.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.6 Pemasangan 1M² lantai ubin warna ukuran 20cm x 20 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Ubin warna Semen Portland Semen warna Pasir Pasang C PERALATAN

Buah Kg Kg M³

0.00

118,105.00

118,105.00 17,715.75 135,820.75

0.270 0.135 0.014 0.014 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

21,600.00 12,150.00 1,400.00 1,540.00 36,690.00

26.500 10.400 1.620 0.045 Jumlah Harga Bahan

1,796.23 1,145.00 8,000.00 265,000.00

47,600.00 11,908.00 12,960.00 11,925.00 84,393.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

JUMLAH HARGA (Rp.) 7 0.00

121,083.00

121,083.00 18,162.45 139,245.45

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.3.7 Pemasangan 1M² lantai ubin teraso ukuran 40 cm x 40 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang Mandor B BAHAN Ubin teraso Semen Portland Semen warna Pasir Pasang

L.03 L.04

HARGA SATUAN (Rp.) 6

0.250 0.125

JUMLAH HARGA (Rp.) 7

80,000.00 90,000.00

20,000.00 11,250.00

OH OH

0.013 0.013 Jumlah Tenaga Kerja

100,000.00 110,000.00

1,300.00 1,430.00 33,980.00

Buah Kg Kg M³

6.630 9.800 1.300 0.045 Jumlah Harga Bahan

0.00 1,145.00 8,000.00 265,000.00

0.00 11,221.00 10,400.00 11,925.00 33,546.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.8 Pemasangan 1M² lantai ubin teraso ukuran 30 cm x 30 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Ubin teraso Semen Portland Semen warna Pasir Pasang

Buah Kg Kg M³

0.00

67,526.00

67,526.00 10,128.90 77,654.90

0.260 0.130 0.013 0.013 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

20,800.00 11,700.00 1,300.00 1,430.00 35,230.00

11.870 10.000 1.500 0.045 Jumlah Harga Bahan

0.00 1,145.00 8,000.00 265,000.00

0.00 11,450.00 12,000.00 11,925.00 35,375.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.9 Pemasangan 1M² lantai ubin granit ukuran 40 cm x 40 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Ubin Granit Semen Portland Semen warna Pasir Pasang C PERALATAN

Buah Kg Kg M³

0.00

70,605.00

70,605.00 10,590.75 81,195.75

0.250 0.125 0.013 0.013 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

20,000.00 11,250.00 1,300.00 1,430.00 33,980.00

6.630 9.800 1.300 0.045 Jumlah Harga Bahan

19,984.92 1,145.00 8,000.00 265,000.00

132,500.00 11,221.00 10,400.00 11,925.00 166,046.00

NO

URAIAN

KODE

SAT

1

2

3

4

KOEFISIEN 5 Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

HARGA SATUAN (Rp.) 6

15%

A.4.4.3.10 Pemasangan 1M² lantai ubin granit ukuran 30 cm x 30 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Ubin Granit Semen Portland

Buah Kg

Semen warna Pasir Pasang

Kg M³

11.870 10.000 1.500 0.045 Jumlah Harga Bahan

7 0.00

200,026.00

0.260 0.130 0.013 0.013 Jumlah Tenaga Kerja

JUMLAH HARGA (Rp.)

200,026.00 30,003.90 230,029.90

80,000.00 90,000.00 100,000.00 110,000.00

20,800.00 11,700.00 1,300.00 1,430.00 35,230.00

0.00 1,145.00

0.00 11,450.00

8,000.00 265,000.00

12,000.00 11,925.00 35,375.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.11 Pemasangan 1M² lantai ubin teralux marmer ukuran 40 cm x 40 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH

0.250 0.125 0.013 0.013

0.00

70,605.00

70,605.00 10,590.75 81,195.75

80,000.00 90,000.00 100,000.00 110,000.00

20,000.00 11,250.00 1,300.00 1,430.00

Jumlah Tenaga Kerja B BAHAN Ubin teralux Semen Portland Semen warna Pasir Pasang

Buah Kg Kg M³

6.630 9.800 1.300 0.045 Jumlah Harga Bahan

33,980.00 0.00 1,145.00 8,000.00 265,000.00

0.00 11,221.00 10,400.00 11,925.00 33,546.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.12 Pemasangan 1M² lantai ubin teralux marmer ukuran 30 cm x 30 cm. A TENAGA Pekerja L.01 OH 0.260 Tukang Batu L.02 OH 0.130 Kepala Tukang L.03 OH 0.013 Mandor L.04 OH 0.013 Jumlah Tenaga Kerja B BAHAN Ubin teralux Buah 11.870 Semen Portland Kg 10.000

0.00

67,526.00

67,526.00 10,128.90 77,654.90

80,000.00 90,000.00 100,000.00 110,000.00

20,800.00 11,700.00 1,300.00 1,430.00 35,230.00

0.00 1,145.00

0.00 11,450.00

NO 1

URAIAN

KODE

SAT

2

3

4 Kg M³

Semen warna Pasir Pasang

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 1.500 8,000.00 12,000.00 0.045 265,000.00 11,925.00 Jumlah Harga Bahan 35,375.00 KOEFISIEN

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

70,605.00

A.4.4.3.13 Pemasangan 1M² lantai ubin teralux marmer ukuran 60 cm x 60 cm. A TENAGA Pekerja L.01 OH 0.240 Tukang Batu L.02 OH 0.120 Kepala Tukang L.03 OH 0.012 Mandor L.04 OH 0.012 Jumlah Tenaga Kerja B BAHAN Ubin teralux Buah 3.100 Semen Portland Kg 9.600 Semen warna Kg 1.500 Pasir Pasang M³ 0.045 Jumlah Harga Bahan C PERALATAN

80,000.00 90,000.00 100,000.00 110,000.00

19,200.00 10,800.00 1,200.00 1,320.00 32,520.00

0.00 1,145.00 8,000.00 265,000.00

0.00 10,992.00 12,000.00 11,925.00 34,917.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

67,437.00

A.4.4.3.14 Pemasangan 1M² lantai ubin teralux marmer ukuran 40 cm x 40 cm. A TENAGA Pekerja L.01 OH 0.250 Tukang Batu L.02 OH 0.125 Kepala Tukang L.03 OH 0.013 Mandor L.04 OH 0.013 Jumlah Tenaga Kerja B BAHAN Ubin teralux Buah 6.630 Semen Portland Kg 9.800 Semen warna Kg 1.300 M³ Pasir Pasang 0.045 Jumlah Harga Bahan C PERALATAN

A.4.4.3.15 Pemasangan 1M² lantai ubin teralux marmer ukuran 30 cm x 30 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH

15%

0.260 0.130 0.013

67,437.00 10,115.55 77,552.55

80,000.00 90,000.00 100,000.00 110,000.00

20,000.00 11,250.00 1,300.00 1,430.00 33,980.00

0.00 1,145.00 8,000.00 265,000.00

0.00 11,221.00 10,400.00 11,925.00 33,546.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

70,605.00 10,590.75 81,195.75

0.00

67,526.00

67,526.00 10,128.90 77,654.90

80,000.00 90,000.00 100,000.00

20,800.00 11,700.00 1,300.00

NO

URAIAN

KODE

SAT

2

3 L.04

4 OH

1 Mandor B BAHAN Ubin teralux Semen Portland Semen warna Pasir Pasang

Buah Kg Kg M³

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.013 110,000.00 1,430.00 Jumlah Tenaga Kerja 35,230.00 KOEFISIEN

11.870 10.000 1.500 0.045 Jumlah Harga Bahan

0.00 1,145.00 8,000.00 265,000.00

0.00 11,450.00 12,000.00 11,925.00 35,375.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.16 Pemasangan 1M' plint ubin Pc abu abu ukuran 15 cm x 20 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Plint ubin PC Semen Portland Pasir Pasang

Buah Kg M³

0.00

70,605.00

70,605.00 10,590.75 81,195.75

0.090 0.090 0.009 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 900.00 550.00 16,750.00

5.300 1.650 0.004 Jumlah Harga Bahan

0.00 1,145.00 265,000.00

0.00 1,889.25 1,060.00 2,949.25

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.17 Pemasangan 1M' plint ubin Pc abu abu ukuran 10 cm x 30 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Plint ubin PC Semen Portland Pasir Pasang

Buah Kg M³

0.00

19,699.25

19,699.25 2,954.88 22,654.13

0.090 0.090 0.009 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 900.00 550.00 16,750.00

3.530 1.240 0.003 Jumlah Harga Bahan

0.00 1,145.00 265,000.00

0.00 1,419.80 795.00 2,214.80

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

18,964.80

18,964.80 2,844.72 21,809.52

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.3.18 Pemasangan 1M' plint ubin Pc abu abu ukuran 10 cm x 40 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Plint ubin PC Semen Portland Pasir Pasang

Buah Kg M³

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

0.090 0.090 0.009 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 900.00 550.00 16,750.00

2.650 1.240 0.003 Jumlah Harga Bahan

0.00 1,145.00 265,000.00

0.00 1,419.80 795.00 2,214.80

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.19 Pemasangan 1M' plint ubin warna ukuran 10 cm x 20 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Plint ubin warna Semen Portland Semen warna Pasir Pasang

Buah Kg Kg M³

0.00

18,964.80

18,964.80 2,844.72 21,809.52

0.090 0.090 0.009 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 900.00 550.00 16,750.00

2.650 1.140 0.100 0.003 Jumlah Harga Bahan

0.00 1,145.00 8,000.00 265,000.00

0.00 1,305.30 800.00 795.00 2,900.30

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.20 Pemasangan 1M' plint ubin warna ukuran 10 cm x 30 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Plint ubin warna Semen Portland Semen warna Pasir Pasang

Buah Kg Kg M³

0.00

19,650.30

19,650.30 2,947.54 22,597.84

0.090 0.090 0.009 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 900.00 550.00 16,750.00

3.530 1.140 0.100 0.003 Jumlah Harga Bahan

0.00 1,145.00 8,000.00 265,000.00

0.00 1,305.30 800.00 795.00 2,900.30

C PERALATAN Jumlah Harga Alat

0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

HARGA SATUAN (Rp.) 6

19,650.30

JUMLAH HARGA (Rp.) 7 19,650.30 2,947.54 22,597.84

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.3.21 Pemasangan 1M' plint ubin warna ukuran 10 cm x 40 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Plint ubin warna Semen Portland Semen warna Pasir Pasang

Buah Kg Kg M³

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

0.090 0.090 0.009 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 900.00 550.00 16,750.00

2.650 1.140 0.100 0.003 Jumlah Harga Bahan

0.00 1,145.00 8,000.00 265,000.00

0.00 1,305.30 800.00 795.00 2,900.30

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.22 Pemasangan 1M' plint ubin teraso ukuran 10 cm x 30 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Plint ubin teraso Semen Portland Semen warna Pasir Pasang

Buah Kg Kg M³

0.00

19,650.30

19,650.30 2,947.54 22,597.84

0.090 0.090 0.009 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 900.00 550.00 16,750.00

3.530 1.140 0.100 0.003 Jumlah Harga Bahan

0.00 1,145.00 8,000.00 265,000.00

0.00 1,305.30 800.00 795.00 2,900.30

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.23 Pemasangan 1M' plint ubin teraso ukuran 10 cm x 40 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Plint ubin teraso Semen Portland Semen warna Pasir Pasang

Buah Kg Kg M³

0.00

19,650.30

19,650.30 2,947.54 22,597.84

0.090 0.090 0.009 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 900.00 550.00 16,750.00

2.650 1.140 0.100 0.003 Jumlah Harga Bahan

0.00 1,145.00 8,000.00 265,000.00

0.00 1,305.30 800.00 795.00 2,900.30

NO 1

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

19,650.30

19,650.30 2,947.54 22,597.84

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.4.4.3.24 Pemasangan 1M' plint ubin granit ukuran 10 cm x 40 cm. A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor B BAHAN Plint ubin granit Semen Portland Semen warna Pasir Pasang

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.009 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 900.00 550.00 16,750.00

Buah Kg Kg M³

2.650 1.140 0.100 0.003 Jumlah Harga Bahan

2,264.15 1,145.00 8,000.00 265,000.00

6,000.00 1,305.30 800.00 795.00 8,900.30

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit

15%

0.00

25,650.30

F Harga Satuan Pekerjaaan (D+E)

29,497.84

A.4.4.3.25 Pemasangan 1M' plint ubin granit ukuran 10 cm x 30 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Plint ubin granit Semen Portland Semen warna Pasir Pasang

25,650.30 3,847.54

Buah Kg Kg M³

0.090 0.090 0.009 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 900.00 550.00 16,750.00

3.530 1.140 0.100 0.003 Jumlah Harga Bahan

0.00 1,145.00 8,000.00 265,000.00

0.00 1,305.30 800.00 795.00 2,900.30

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.26 Pemasangan 1M' plint ubin teralux kerang ukuran 10 cm x 40 cm. A TENAGA Pekerja L.01 OH 0.090 Tukang Batu L.02 OH 0.090 Kepala Tukang L.03 OH 0.009 Mandor L.04 OH 0.005 Jumlah Tenaga Kerja B BAHAN Plint teralux kerang Buah 2.630 Semen Portland Kg 1.140 Semen warna Kg 0.100 Pasir Pasang M³ 0.003

0.00

19,650.30

19,650.30 2,947.54 22,597.84

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 900.00 550.00 16,750.00

0.00 1,145.00 8,000.00 265,000.00

0.00 1,305.30 800.00 795.00

NO

URAIAN

KODE

SAT

1

2

3

4

HARGA SATUAN (Rp.) 5 6 Jumlah Harga Bahan KOEFISIEN

JUMLAH HARGA (Rp.) 7 2,900.30

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

19,650.30

19,650.30 2,947.54 22,597.84

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.4.3.27 Pemasangan 1M' plint ubin teralux kerang ukuran 10 cm x 30 cm. A TENAGA Pekerja L.01 OH 0.090 Tukang Batu L.02 OH 0.090 Kepala Tukang L.03 OH 0.009 Mandor L.04 OH 0.005 Jumlah Tenaga Kerja B BAHAN Plint teralux kerang Buah 3.530 Semen Portland Kg 1.140 Semen warna Kg 0.100 Pasir Pasang M³ 0.003 Jumlah Harga Bahan C PERALATAN

15%

A.4.4.3.28 Pemasangan 1M' plint ubin teralux marmer ukuran 10 cm x 60 cm. A TENAGA Pekerja L.01 OH 0.090 Tukang Batu L.02 OH 0.090 Kepala Tukang L.03 OH 0.009 Mandor L.04 OH 0.005 Jumlah Tenaga Kerja B BAHAN Plint teralux marmer Buah 1.700 Semen Portland Kg 1.140 Semen warna Kg 0.100 M³ Pasir Pasang 0.003 Jumlah Harga Bahan C PERALATAN

7,200.00 8,100.00 900.00 550.00 16,750.00

0.00 1,145.00 8,000.00 265,000.00

0.00 1,305.30 800.00 795.00 2,900.30

0.00

19,650.30

15%

A.4.4.3.29 Pemasangan 1M' plint ubin teralux marmer ukuran 10 cm x 40 cm. A TENAGA Pekerja L.01 OH 0.090 Tukang Batu L.02 OH 0.090 Kepala Tukang L.03 OH 0.009 Mandor L.04 OH 0.005 Jumlah Tenaga Kerja B BAHAN Plint teralux marmer Buah 2.650 Semen Portland Kg 1.140 Semen warna Kg 0.100 M³ Pasir Pasang 0.003

19,650.30 2,947.54 22,597.84

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 900.00 550.00 16,750.00

0.00 1,145.00 8,000.00 265,000.00

0.00 1,305.30 800.00 795.00 2,900.30

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

80,000.00 90,000.00 100,000.00 110,000.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

19,650.30

19,650.30 2,947.54 22,597.84

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 900.00 550.00 16,750.00

0.00 1,145.00 8,000.00 265,000.00

0.00 1,305.30 800.00 795.00

NO

URAIAN

KODE

SAT

1

2

3

4

HARGA SATUAN (Rp.) 5 6 Jumlah Harga Bahan KOEFISIEN

JUMLAH HARGA (Rp.) 7 2,900.30

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

19,650.30

19,650.30 2,947.54 22,597.84

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.4.3.30 Pemasangan 1M' plint ubin teralux marmer ukuran 10 cm x 30 cm. A TENAGA Pekerja L.01 OH 0.090 Tukang Batu L.02 OH 0.090 Kepala Tukang L.03 OH 0.009 Mandor L.04 OH 0.005 Jumlah Tenaga Kerja B BAHAN Plint teralux marmer Buah 3.530 Semen Portland Kg 1.140 Semen warna Kg 0.100 Pasir Pasang M³ 0.003 Jumlah Harga Bahan

JUMLAH HARGA (Rp.) 7

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 900.00 550.00 16,750.00

0.00 1,145.00 8,000.00 265,000.00

0.00 1,305.30 800.00 795.00 2,900.30

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.31 Pemasangan 1M² lantai teraso cor di tempat, tebal 3 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Teraso cor Semen warna

Kg

19,650.30

0.360 0.180 0.018 0.018 Jumlah Tenaga Kerja



0.00

0.036 0.100 Jumlah Harga Bahan

19,650.30 2,947.54 22,597.84

80,000.00 90,000.00 100,000.00 110,000.00

28,800.00 16,200.00 1,800.00 1,980.00 48,780.00

0.00

0.00

8,000.00

800.00 800.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.32 Pemasangan 1M² lantai keramik artistik 10 cm x 20 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Ubin keramik Semen Portland Pasir Pasang Semen warna C PERALATAN

Buah Kg M³ Kg

0.00

49,580.00

49,580.00 7,437.00 57,017.00

0.700 0.350 0.035 0.035 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

56,000.00 31,500.00 3,500.00 3,850.00 94,850.00

53.000 8.190 0.045 2.750 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 8,000.00

0.00 9,377.55 11,925.00 22,000.00 43,302.55

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

JUMLAH HARGA (Rp.) 7 0.00

138,152.55

138,152.55 20,722.88 158,875.43

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.4.3.33 Pemasangan 1M² lantai keramik artistik 10 cm x 10 cm. atau 5 cm x 20 cm A TENAGA Pekerja L.01 OH 0.700 Tukang Batu Kepala Tukang Mandor B BAHAN Ubin keramik Semen Portland Pasir Pasang Semen warna

L.02 L.03 L.04

JUMLAH HARGA (Rp.) 7

80,000.00

56,000.00

OH OH OH

0.350 0.035 0.035 Jumlah Tenaga Kerja

90,000.00 100,000.00 110,000.00

31,500.00 3,500.00 3,850.00 94,850.00

Buah Kg M³ Kg

106.000 8.190 0.045 3.200 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 8,000.00

0.00 9,377.55 11,925.00 25,600.00 46,902.55

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.34 Pemasangan 1M² lantai keramik ukuran 33 cm x 33 cm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Ubin keramik Semen Portland Pasir Pasang Semen warna

Buah Kg M³ Kg

0.00

141,752.55

141,752.55 21,262.88 163,015.43

0.700 0.350 0.035 0.035 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

56,000.00 31,500.00 3,500.00 3,850.00 94,850.00

10.000 8.190 0.045 1.620 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 8,000.00

0.00 9,377.55 11,925.00 12,960.00 34,262.55

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.35 Pemasangan 1M² lantai keramik ukuran 30 cm x 30 cm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Ubin keramik Semen Portland Pasir Pasang Semen warna

Buah Kg M³ Kg

0.700 0.350 0.035 0.035 Jumlah Tenaga Kerja 11.870 10.000 0.045 1.500

0.00

129,112.55

129,112.55 19,366.88 148,479.43

80,000.00 90,000.00 100,000.00 110,000.00

56,000.00 31,500.00 3,500.00 3,850.00 94,850.00

3,513.06 1,145.00 265,000.00 8,000.00

41,700.00 11,450.00 11,925.00 12,000.00

NO

URAIAN

KODE

SAT

1

2

3

4

HARGA SATUAN (Rp.) 5 6 Jumlah Harga Bahan KOEFISIEN

JUMLAH HARGA (Rp.) 7 77,075.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

171,925.00

171,925.00 25,788.75 197,713.75

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.3.36 Pemasangan 1M² lantai keramik ukuran 20 cm x 20 cm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Ubin keramik Semen Portland Pasir Pasang Semen warna

Buah Kg M³ Kg

HARGA SATUAN (Rp.) 6

0.700 0.350 0.035 0.035 Jumlah Tenaga Kerja 26.500 10.400 0.045 1.620 Jumlah Harga Bahan

JUMLAH HARGA (Rp.) 7

80,000.00 90,000.00 100,000.00 110,000.00

56,000.00 31,500.00 3,500.00 3,850.00 94,850.00

1,924.53

51,000.00

1,145.00 265,000.00 8,000.00

11,908.00 11,925.00 12,960.00 87,793.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.37 Pemasangan 1M² lantai keramik ukuran 10 cm x 33 cm untuk variasi/border A TENAGA Pekerja L.01 OH 1.050 Tukang Batu L.02 OH 0.525 Kepala Tukang L.03 OH 0.053 Mandor L.04 OH 0.053 Jumlah Tenaga Kerja B BAHAN Ubin keramik Buah 33.000 Semen Portland Kg 9.800 Pasir Pasang M³ 0.045 Semen warna Kg 4.370 Jumlah Harga Bahan C PERALATAN

0.00

182,643.00

80,000.00 90,000.00 100,000.00 110,000.00

84,000.00 47,250.00 5,300.00 5,830.00 142,380.00

0.00 1,145.00 265,000.00 8,000.00

0.00 11,221.00 11,925.00 34,960.00 58,106.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.38 Pemasangan 1M² lantai keramik mozaik ukuran 30 cm x 30 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Ubin keramik Semen Portland Pasir Pasang Semen warna

Buah Kg M³ Kg

0.700 0.350 0.035 0.035 Jumlah Tenaga Kerja 11.870 14.150 0.039 2.000

182,643.00 27,396.45 210,039.45

0.00

200,486.00

200,486.00 30,072.90 230,558.90

80,000.00 90,000.00 100,000.00 110,000.00

56,000.00 31,500.00 3,500.00 3,850.00 94,850.00

0.00 1,145.00 265,000.00 8,000.00

0.00 16,201.75 10,335.00 16,000.00

NO

URAIAN

KODE

SAT

1

2

3

4

HARGA SATUAN (Rp.) 5 6 Jumlah Harga Bahan KOEFISIEN

JUMLAH HARGA (Rp.) 7 42,536.75

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

137,386.75

137,386.75 20,608.01 157,994.76

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.3.39 Pemasangan 1M' plint keramik ukuran 10 cm x 20 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Plint keramik Semen Portland Pasir Pasang Semen warna

Buah Kg M³ Kg

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

0.090 0.090 0.035 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 3,500.00 550.00 19,350.00

5.300 1.140 0.003 0.025 Jumlah Harga Bahan

113.21 1,145.00 265,000.00 8,000.00

600.00 1,305.30 795.00 200.00 2,900.30

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.40 Pemasangan 1M' plint keramik ukuran 10 cm x 10 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Plint keramik Semen Portland

Buah Kg

Pasir Pasang Semen warna

M³ Kg

0.090 0.090 0.035 0.005 Jumlah Tenaga Kerja 10.600 1.140 0.003 0.050 Jumlah Harga Bahan

0.00

22,250.30

22,250.30 3,337.54 25,587.84

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 3,500.00 550.00 19,350.00

0.00 1,145.00

0.00 1,305.30

265,000.00 8,000.00

795.00 400.00 2,500.30

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.41 Pemasangan 1M' plint keramik ukuran 5 cm x 20 cm. A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Plint keramik Semen Portland Pasir Pasang Semen warna

Buah Kg M³ Kg

0.090 0.090 0.035 0.005 Jumlah Tenaga Kerja 5.300 0.570 0.0015 0.013

0.00

21,850.30

21,850.30 3,277.54 25,127.84

80,000.00 90,000.00 100,000.00 110,000.00

7,200.00 8,100.00 3,500.00 550.00 19,350.00

0.00 1,145.00 265,000.00 8,000.00

0.00 652.65 397.50 104.00

NO

URAIAN

KODE

SAT

1

2

3

4

HARGA SATUAN (Rp.) 5 6 Jumlah Harga Bahan KOEFISIEN

JUMLAH HARGA (Rp.) 7 1,154.15

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

20,504.15

20,504.15 3,075.62 23,579.77

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

A.4.4.3.42 Pemasangan 1M' plint internal cove artistik 5 cm x 5 cm x 20 cm. A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

L.01 L.02 L.03 L.04

B BAHAN Internal cove Semen Portland Pasir Pasang Semen warna

OH OH OH OH

0.750 0.750 0.075 0.038 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

60,000.00 67,500.00 7,500.00 4,180.00 139,180.00

Buah Kg M³ Kg

5.300 1.140 0.0030 0.100 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 8,000.00

0.00 1,305.30 795.00 800.00 2,900.30

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.43 Pemasangan 1M² lantai marmer ukuran 100 cm x 100 cm . A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Marmer Semen Portland Pasir Pasang Semen warna

Buah Kg M³ Kg

0.00

142,080.30

142,080.30 21,312.04 163,392.34

0.700 0.350 0.035 0.035 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

56,000.00 31,500.00 3,500.00 3,850.00 94,850.00

1.060 8.190 0.0450 0.650 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 8,000.00

0.00 9,377.55 11,925.00 5,200.00 26,502.55

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.4.3.44 Pemasangan 1M² lantai karpet A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor B BAHAN Karpet Lem C PERALATAN

15%

L.01 L.02 L.03 L.04

0.00

121,352.55

121,352.55 18,202.88 139,555.43

OH OH OH OH

0.170 0.170 0.017 0.009 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

13,600.00 15,300.00 1,700.00 990.00 31,590.00

M² Kg

1.050 0.350 Jumlah Harga Bahan

0.00 0.00

0.00 0.00 0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

JUMLAH HARGA (Rp.) 7 0.00

31,590.00

31,590.00 4,738.50 36,328.50

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.3.45 Pemasangan 1M² lantai underlayer (pelapis bawah karpet) A TENAGA Pekerja L.01 OH Tukang Kayu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Underlayer Lem

M² Kg

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

0.120 0.120 0.012 0.006 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

9,600.00 10,800.00 1,200.00 660.00 22,260.00

1.050 0.350 Jumlah Harga Bahan

0.00 0.00

0.00 0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.4.3.46 Pemasangan 1M² lantai parquet kayu A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Parquet Lem

15%

0.00

22,260.00

22,260.00 3,339.00 25,599.00

OH OH OH OH

0.700 0.350 0.035 0.035 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

56,000.00 31,500.00 3,500.00 3,850.00 94,850.00

M² Kg

1.050 0.600 Jumlah Harga Bahan

0.00 0.00

0.00 0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.4.3.47 Pemasangan 1M² lantai kayu gymfloor A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kayu Gymfloor Lem

15%

0.00

94,850.00

94,850.00 14,227.50 109,077.50

OH OH OH OH

0.700 0.350 0.035 0.035 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

56,000.00 31,500.00 3,500.00 3,850.00 94,850.00

M² Kg

1.050 0.600 Jumlah Harga Bahan

0.00 0.00

0.00 0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit

15%

0.00

94,850.00

94,850.00 14,227.50

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7 109,077.50

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.3.48 Pemasangan 1M² dinding porslen 11 cm x 11 cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Porslen Semen Portland Pasir Pasang Semen warna

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

1.000 0.500 0.050 0.050 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

80,000.00 45,000.00 5,000.00 5,500.00 135,500.00

Buah Kg M³ Kg

86.000 9.300 0.018 1.500 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 8,000.00

0.00 10,648.50 4,770.00 12,000.00 27,418.50

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.4.3.49 Pemasangan 1M² dinding porslen 10 cm x 20 cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Porslen Semen Portland Pasir Pasang Semen warna

15%

0.00

162,918.50

162,918.50 24,437.77 187,356.27

OH OH OH OH

0.900 0.450 0.045 0.045 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

72,000.00 40,500.00 4,500.00 4,950.00 121,950.00

Buah Kg M³ Kg

53.000 9.300 0.018 2.750 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 8,000.00

0.00 10,648.50 4,770.00 22,000.00 37,418.50

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.4.3.50 Pemasangan 1M² dinding porslen 20 cm x 20 cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Porslen Semen Portland Pasir Pasang Semen warna

15%

0.00

159,368.50

159,368.50 23,905.27 183,273.77

OH OH OH OH

0.900 0.450 0.045 0.045 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

72,000.00 40,500.00 4,500.00 4,950.00 121,950.00

Buah Kg M³ Kg

26.000 9.300 0.018 1.940 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 8,000.00

0.00 10,648.50 4,770.00 15,520.00 30,938.50

NO 1

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

152,888.50

152,888.50 22,933.27 175,821.77

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.3.51 Pemasangan 1M² dinding keramik artistik 10 cm x 20 cm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Keramik artistik Semen Portland Pasir Pasang Semen warna

Bh Kg M³ Kg

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

0.900 0.450 0.045 0.045 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

72,000.00 40,500.00 4,500.00 4,950.00 121,950.00

53.000 9.300 0.018 2.750 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 8,000.00

0.00 10,648.50 4,770.00 22,000.00 37,418.50

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.52 Pemasangan 1M² dinding keramik artistik 5 cm x 20 cm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Keramik artistik Semen Portland Pasir Pasang Semen warna

Bh Kg M³ Kg

0.00

159,368.50

159,368.50 23,905.27 183,273.77

0.900 0.450 0.045 0.045 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

72,000.00 40,500.00 4,500.00 4,950.00 121,950.00

106.000 9.300 0.018 2.900 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 8,000.00

0.00 10,648.50 4,770.00 23,200.00 38,618.50

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.4.3.53 Pemasangan 1M² dinding keramik 10 cm x 20 cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Keramik Semen Portland Pasir Pasang Semen warna

15%

0.00

160,568.50

160,568.50 24,085.27 184,653.77

OH OH OH OH

0.900 0.450 0.045 0.045 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

72,000.00 40,500.00 4,500.00 4,950.00 121,950.00

Bh Kg M³ Kg

53.000 9.300 0.018 2.750 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 8,000.00

0.00 10,648.50 4,770.00 22,000.00 37,418.50

NO 1

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

159,368.50

159,368.50 23,905.27 183,273.77

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.3.54 Pemasangan 1M² dinding keramik 20 cm x 20 cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Keramik Semen Portland Pasir Pasang Semen warna

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.900 0.450 0.045 0.045 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

72,000.00 40,500.00 4,500.00 4,950.00 121,950.00

Bh Kg M³ Kg

26.500 9.300 0.018 1.940 Jumlah Harga Bahan

2,290.57 1,145.00 265,000.00 8,000.00

60,700.00 10,648.50 4,770.00 15,520.00 91,638.50

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.55 Pemasangan 1M² dinding keramik marmer 100 cm x 100 cm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Marmer Semen Portland Pasir Pasang Semen warna Paku 12 cm

Bh Kg M³ Kg Bh

0.00

213,588.50

213,588.50 32,038.27 245,626.77

1.300 0.650 0.065 0.065 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

104,000.00 58,500.00 6,500.00 7,150.00 176,150.00

1.060 12.440 0.025 0.650 3.030 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 8,000.00 1,500.00

0.00 14,243.80 6,625.00 5,200.00 4,545.00 30,613.80

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.4.3.56 Pemasangan 1M² dinding bata pelapis 3cm x 7cm x 24cm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Bata pelapis Semen Portland Pasir Pasang Semen warna

Bh Kg M³ Kg

1.000 0.500 0.050 0.050 Jumlah Tenaga Kerja 63.000 12.440 0.025 2.750

0.00

206,763.80

206,763.80 31,014.57 237,778.37

80,000.00 90,000.00 100,000.00 110,000.00

80,000.00 45,000.00 5,000.00 5,500.00 135,500.00

0.00 1,145.00 265,000.00 8,000.00

0.00 14,243.80 6,625.00 22,000.00

NO

URAIAN

KODE

SAT

1

2

3

4

HARGA SATUAN (Rp.) 5 6 Jumlah Harga Bahan KOEFISIEN

JUMLAH HARGA (Rp.) 7 42,868.80

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

178,368.80

178,368.80 26,755.32 205,124.12

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.3.57 Pemasangan 1M² dinding bata paras A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Bata paras Semen Portland Pasir Pasang

OH OH OH OH

Bh Kg M³

HARGA SATUAN (Rp.) 6

0.700 0.350 0.035 0.035 Jumlah Tenaga Kerja 1.100 11.750 0.035

JUMLAH HARGA (Rp.) 7

80,000.00 90,000.00 100,000.00 110,000.00

56,000.00 31,500.00 3,500.00 3,850.00 94,850.00

0.00 1,145.00 265,000.00

0.00 13,453.75 9,275.00

Jumlah Harga Bahan

22,728.75

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.4.3.58 Pemasangan 1M² dinding batu tempel hitam A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Batu tempel hitam Semen Portland Pasir Pasang

15%

OH OH OH OH

Bh Kg M³

0.700 0.350 0.035 0.035 Jumlah Tenaga Kerja 1.100 11.750 0.035

0.00

117,578.75

117,578.75 17,636.81 135,215.56

80,000.00 90,000.00 100,000.00 110,000.00

56,000.00 31,500.00 3,500.00 3,850.00 94,850.00

120,000.00 1,145.00 265,000.00

132,000.00 13,453.75 9,275.00

Jumlah Harga Bahan

154,728.75

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.4.3.59 Pemasangan 1M² lantai vynil ukuran 30cm x 30cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN vynil lem

15%

OH OH OH OH

Bh Kg

0.150 0.150 0.015 0.008 Jumlah Tenaga Kerja 11.870 0.350

Jumlah Harga Bahan

0.00

249,578.75

249,578.75 37,436.81 287,015.56

80,000.00 90,000.00 100,000.00 110,000.00

12,000.00 13,500.00 1,500.00 880.00 27,880.00

0.00 0.00

0.00 0.00

0.00

NO 1

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

27,880.00

27,880.00 4,182.00 32,062.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.3.60 Pemasangan 1M² walpaper lebar 50cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN walpaper lem

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.350 0.175 0.017 0.002 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

28,000.00 15,750.00 1,700.00 220.00 45,670.00

Bh Kg

2.200 0.250 Jumlah Harga Bahan

0.00 0.00

0.00 0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.4.3.61 Pemasangan 1M² floor hardener A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

15%

L.01 L.02 L.03 L.04

B BAHAN floor hardener

0.00

45,670.00

45,670.00 6,850.50 52,520.50

OH OH OH OH

0.120 0.120 0.012 0.006 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

9,600.00 10,800.00 1,200.00 660.00 22,260.00

Kg

5.000 Jumlah Harga Bahan

0.00

0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.4.3.62 Pemasangan 1M' plint vynil 15cm x 30cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN vynil lem

15%

0.00

22,260.00

22,260.00 3,339.00 25,599.00

OH OH OH OH

0.080 0.080 0.008 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,400.00 7,200.00 800.00 440.00 14,840.00

Bh Kg

1.760 0.080 Jumlah Harga Bahan

0.00 0.00

0.00 0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

14,840.00

14,840.00 2,226.00 17,066.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.4.3.63 Pemasangan 1M' plint kayu tebal 2cm lebar 10cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN papan kayu kelas 1 paku / skrup 5cm

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.120 0.120 0.012 0.006 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

9,600.00 10,800.00 1,200.00 660.00 22,260.00

M3 Kg

0.003 0.050 Jumlah Harga Bahan

25,000,000.00 16,400.00

75,000.00 820.00 75,820.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.4.3.64 Pemasangan 1M 2 paving block natural tebal 6 cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04

15%

0.00

98,080.00

98,080.00 14,712.00 112,792.00

OH OH OH OH

0.250 0.500 0.050 0.0013 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

20,000.00 45,000.00 5,000.00 143.00 70,143.00

B BAHAN Paving block 6 cm Pasir beton

M2 M3

1.010 0.050 Jumlah Harga Bahan

57,500.00 265,000.00

58,075.00 13,250.00 71,325.00

C PERALATAN Peralatan

%

10.000 Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.4.3.65 Pemasangan 1M 2 paving block natural tebal 8 cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04

15%

5,750.00 5,750.00

147,218.00

147,218.00 22,082.70 169,300.70

OH OH OH OH

0.250 0.500 0.050 0.0013 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

20,000.00 45,000.00 5,000.00 143.00 70,143.00

B BAHAN Paving block 8 cm Pasir beton

M2 M3

1.010 0.050 Jumlah Harga Bahan

76,000.00 265,000.00

76,760.00 13,250.00 90,010.00

C PERALATAN Peralatan

%

10.000 Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

7,600.00 7,600.00

167,753.00

167,753.00 25,162.95 192,915.95

NO

URAIAN

KODE

1 2 3 A.4.4.3.66 Pemasangan 1M 2 paving block bewarna tebal 6 cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04

SAT

KOEFISIEN

4

5

HARGA SATUAN (Rp.) 6

OH OH OH OH

0.250 0.500 0.050 0.0013 Jumlah Tenaga Kerja

B BAHAN Paving block 6 cm bewarna Pasir beton

M2 M3

1.010 0.050 Jumlah Harga Bahan

C PERALATAN Peralatan

%

10.000 Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.4.3.67 Pemasangan 1M 2 paving block bewarna tebal 8 cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04

15%

OH OH OH OH

0.500 0.500 0.050 0.0013 Jumlah Tenaga Kerja

B BAHAN Paving block 8 cm bewarna Pasir beton

M2 M3

1.010 0.050 Jumlah Harga Bahan

C PERALATAN Peralatan

%

10.000 Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND) A.4.5.1.1 Pemasangan 1M2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm A TENAGA Pekerja L.01 OH 0.030 Tukang Batu L.02 OH 0.070 Kepala Tukang L.03 OH 0.007 Mandor L.04 OH 0.004 Jumlah Tenaga Kerja B BAHAN asbes semen M2 1.100 paku triplek Kg 0.010

80,000.00 90,000.00 100,000.00 110,000.00

265,000.00

JUMLAH HARGA (Rp.) 7

20,000.00 45,000.00 5,000.00 143.00 70,143.00 0.00 13,250.00 13,250.00 0.00 0.00

83,393.00

80,000.00 90,000.00 100,000.00 110,000.00

265,000.00

83,393.00 12,508.95 95,901.95

40,000.00 45,000.00 5,000.00 143.00 90,143.00 0.00 13,250.00 13,250.00 0.00 0.00

103,393.00

103,393.00 15,508.95 118,901.95

80,000.00 90,000.00 100,000.00 110,000.00

2,400.00 6,300.00 700.00 440.00 9,840.00

24,200.00 33,900.00

26,620.00 339.00

Jumlah Harga Bahan

26,959.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit

15%

0.00

36,799.00

36,799.00 5,519.85

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

JUMLAH HARGA (Rp.) 7 42,318.85

A.4.5.1.2 Pemasangan 1M² langit-langit akustik ukuran (30cm x 30cm) A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN akustik paku triplek

HARGA SATUAN (Rp.) 6

lembar Kg

0.120 0.120 0.012 0.006 Jumlah Tenaga Kerja 12.000 0.050

80,000.00 90,000.00 100,000.00 110,000.00

9,600.00 10,800.00 1,200.00 660.00 22,260.00

0.00 33,900.00

0.00 1,695.00

Jumlah Harga Bahan

1,695.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

23,955.00

23,955.00 3,593.25 27,548.25

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.5.1.3 Pemasangan 1M² langit-langit akustik ukuran (30cm x 60cm) A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN akustik paku triplek

HARGA SATUAN (Rp.) 6

0.120 0.120 0.012 0.006 Jumlah Tenaga Kerja

lembar Kg

5.800 0.050

JUMLAH HARGA (Rp.) 7

80,000.00 90,000.00 100,000.00 110,000.00

9,600.00 10,800.00 1,200.00 660.00 22,260.00

0.00 33,900.00

0.00 1,695.00

Jumlah Harga Bahan

1,695.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.5.1.4 Pemasangan 1M² langit-langit akustik ukuran (60cm x 120cm) A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN akustik paku triplek

23,955.00

0.100 0.100 0.010 0.005 Jumlah Tenaga Kerja

lembar Kg

0.00

1.500 0.050

23,955.00 3,593.25 27,548.25

80,000.00 90,000.00 100,000.00 110,000.00

8,000.00 9,000.00 1,000.00 550.00 18,550.00

0.00 33,900.00

0.00 1,695.00

Jumlah Harga Bahan

1,695.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.5.1.5 Pemasangan 1M² langit-langit triplek ukuran (120cm x 240cm) tebal 3mm, 4mm & 6mm A TENAGA Pekerja L.01 OH 0.100 Tukang Batu L.02 OH 0.100 Kepala Tukang L.03 OH 0.010 Mandor L.04 OH 0.005 Jumlah Tenaga Kerja B BAHAN triplek lembar 0.375 paku triplek Kg 0.030

0.00

20,245.00

20,245.00 3,036.75 23,281.75

80,000.00 90,000.00 100,000.00 110,000.00

8,000.00 9,000.00 1,000.00 550.00 18,550.00

65,000.00 33,900.00

24,375.00 1,017.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

Jumlah Harga Bahan

JUMLAH HARGA (Rp.) 7 25,392.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

43,942.00

43,942.00 6,591.30 50,533.30

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.5.1.6 Pemasangan 1M² langit-langit lambrisering kayu, tebal 9mm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN kayu papan paku triplek

HARGA SATUAN (Rp.) 6

0.800 0.800 0.080 0.040 Jumlah Tenaga Kerja

M3 Kg

0.015 0.010

JUMLAH HARGA (Rp.) 7

80,000.00 90,000.00 100,000.00 110,000.00

64,000.00 72,000.00 8,000.00 4,400.00 148,400.00

5,583,300.00 33,900.00

83,749.50 339.00

Jumlah Harga Bahan

84,088.50

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

232,488.50

A.4.5.1.7 Pemasangan 1M² langit-langit gypsum board ukuran ( 120 x 240 x 9) mm, tebal 9mm A TENAGA Pekerja L.01 OH 0.100 Tukang Batu L.02 OH 0.050 Kepala Tukang L.03 OH 0.005 Mandor L.04 OH 0.005 Jumlah Tenaga Kerja B BAHAN gypsum board lembar 0.364 paku skrup

Kg

0.00

0.110

232,488.50 34,873.27 267,361.77

80,000.00 90,000.00 100,000.00 110,000.00

8,000.00 4,500.00 500.00 550.00 13,550.00

61,000.00

22,204.00

300.00

33.00

Jumlah Harga Bahan

22,237.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.5.1.8 Pemasangan 1M² langit-langit akustik ukuran (60 x 120) cm berikut kerangka aluminium A TENAGA Pekerja L.01 OH 0.500 Tukang Besi L.02 OH 0.500 Kepala Tukang L.03 OH 0.050 Mandor L.04 OH 0.025 Jumlah Tenaga Kerja B BAHAN Profil allum "T" M 3.600 Kawat dia 4mm Kg 0.150 Ramset Buah 1.050 Akustik 60 x 120 Lembar 1.500

0.00

35,787.00

35,787.00 5,368.05 41,155.05

80,000.00 90,000.00 100,000.00 110,000.00

40,000.00 45,000.00 5,000.00 2,750.00 92,750.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

NO

URAIAN

KODE

SAT

1

2

3

4

HARGA SATUAN (Rp.) 5 6 Jumlah Harga Bahan KOEFISIEN

JUMLAH HARGA (Rp.) 7 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

92,750.00

92,750.00 13,912.50 106,662.50

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.5.1.9 Pemasangan 1M' list langit-langit kayu profil A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN list profil kayu paku

OH OH OH OH

HARGA SATUAN (Rp.) 6

0.050 0.050 0.005 0.003 Jumlah Tenaga Kerja

M Kg

1.050 0.010

JUMLAH HARGA (Rp.) 7

80,000.00 90,000.00 100,000.00 110,000.00

4,000.00 4,500.00 500.00 330.00 9,330.00

0.00 16,400.00

0.00 164.00

Jumlah Harga Bahan

164.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

9,494.00

9,494.00 1,424.10 10,918.10

A.4.5.1.10 Pemasangan 1M² Rangka langit-langit besi hollow 40.40 Lihat pada kelompok pekerjaan besi dan aluminium (A.9.21)

A.4.5.2 A.4.5.2.1

HARGA SATUAN PEKERJAAN PENUTUP ATAP Pemasangan 1M' atap genteng palentong kecil A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15

OH OH OH OH

0.150 0.075 0.0075 0.008 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

12,000.00 6,750.00 750.00 880.00 20,380.00

B BAHAN Genteng palentong

Bh

25.000 Jumlah Harga Bahan

1,800.00

45,000.00 45,000.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.5.2.2 Pemasangan 1M2 Atap genteng kodok galzuur A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN genteng kodok

15%

OH OH OH OH

Bh

0.150 0.075 0.008 0.008 Jumlah Tenaga Kerja 25.000

0.00

65,380.00

65,380.00 9,807.00 75,187.00

80,000.00 90,000.00 100,000.00 110,000.00

12,000.00 6,750.00 800.00 880.00 20,430.00

11,000.00

275,000.00

NO

URAIAN

KODE

SAT

1

2

3

4

HARGA SATUAN (Rp.) 5 6 Jumlah Harga Bahan KOEFISIEN

JUMLAH HARGA (Rp.) 7 275,000.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

295,430.00

295,430.00 44,314.50 339,744.50

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.5.2.3 Pemasangan 1M2 atap genteng palentong besar / super A TENAGA Pekerja L.01 OH Tukang Kayu L.03 OH Kepala Tukang L.11 OH Mandor L.15 OH B BAHAN genteng kodok

Bh

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

0.150 0.075 0.008 0.008 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

12,000.00 6,750.00 800.00 880.00 20,430.00

12.000 Jumlah Harga Bahan

2,000.00

24,000.00 24,000.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.5.2.4 Pemasangan 1M' bubung genteng palentong A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Genteng bubung Semen portland Pasir Pasang

15%

0.00

44,430.00

44,430.00 6,664.50 51,094.50

OH OH OH OH

0.400 0.200 0.020 0.002 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

32,000.00 18,000.00 2,000.00 220.00 52,220.00

Bh Kg M3

5.000 8.000 0.032 Jumlah Harga Bahan

3,400.00 1,145.00 265,000.00

17,000.00 9,160.00 8,480.00 34,640.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.5.2.5 Pemasangan 1M' bubung genteng kodok glazuur A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Genteng bubung Semen portland Pasir Pasang

15%

OH OH OH OH

Bh Kg M3

0.00

86,860.00

0.400 0.200 0.020 0.002 Jumlah Tenaga Kerja 5.000 8.000 0.032 Jumlah Harga Bahan

86,860.00 13,029.00 99,889.00

80,000.00 90,000.00 100,000.00 110,000.00

32,000.00 18,000.00 2,000.00 220.00 52,220.00

20,000.00 1,145.00 265,000.00

100,000.00 9,160.00 8,480.00 117,640.00

C PERALATAN Jumlah Harga Alat

0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

HARGA SATUAN (Rp.) 6

169,860.00

JUMLAH HARGA (Rp.) 7 169,860.00 25,479.00 195,339.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.4.5.2.6 Pemasangan 1M' bubung palentong besar A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Genteng bubung Semen portland Pasir Pasang

OH OH OH OH

HARGA SATUAN (Rp.) 6

0.400 0.200 0.020 0.002 Jumlah Tenaga Kerja

Bh Kg M3

4.000 8.000 0.032

JUMLAH HARGA (Rp.) 7

80,000.00 90,000.00 100,000.00 110,000.00

32,000.00 18,000.00 2,000.00 220.00 52,220.00

20,000.00 1,145.00 265,000.00

80,000.00 9,160.00 8,480.00

Jumlah Harga Bahan

97,640.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.5.2.7 Pemasangan 1M2 roof light fibreglass 90x180 A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Roof light 90x180 paku biasa

15%

0.00

149,860.00

149,860.00 22,479.00 172,339.00

OH OH OH OH

0.140 0.067 0.007 0.007 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

11,200.00 6,030.00 700.00 770.00 18,700.00

Lembar Kg

0.600 0.050 Jumlah Harga Bahan

0.00 16,400.00

0.00 820.00 820.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.5.2.8 Pemasangan 1M2 atap asbes gelombang 0.92m x 2.5m x 5mm A TENAGA Pekerja L.01 OH Tukang Kayu L.03 OH Kepala Tukang L.11 OH Mandor L.15 OH B BAHAN Asbes gel 92x250 paku pancing 6x23

Lembar Kg

0.00

19,520.00

19,520.00 2,928.00 22,448.00

0.140 0.075 0.008 0.008 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

11,200.00 6,750.00 800.00 880.00 19,630.00

0.500 0.120 Jumlah Harga Bahan

0.00 49,000.00

0.00 5,880.00 5,880.00

C PERALATAN Jumlah Harga Alat

0.00

NO 1

URAIAN 2 D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

HARGA SATUAN (Rp.) 6 25,510.00

JUMLAH HARGA (Rp.) 7 25,510.00 3,826.50 29,336.50

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.5.2.9 Pemasangan 1M2 atap asbes gelombang 0.92m x 2.25m x 5mm A TENAGA Pekerja L.01 OH 0.140 Tukang Kayu L.03 OH 0.075 Kepala Tukang L.11 OH 0.008 Mandor L.15 OH 0.008 Jumlah Tenaga Kerja B BAHAN Asbes gel 92x250 Lembar 0.600 paku pancing 6x23 Kg 0.120 Jumlah Harga Bahan C PERALATAN

15%

A.4.5.2.10 Pemasangan 1M2 atap asbes gelombang 0.92m x 2.00m x 5mm A TENAGA Pekerja L.01 OH 0.140 Tukang Kayu L.03 OH 0.070 Kepala Tukang L.11 OH 0.007 Mandor L.15 OH 0.007 Jumlah Tenaga Kerja B BAHAN Asbes gel 92x250 Lembar 0.600 paku pancing 6x23 Kg 0.120 Jumlah Harga Bahan C PERALATAN

11,200.00 6,750.00 800.00 880.00 19,630.00

0.00 49,000.00

0.00 5,880.00 5,880.00

0.00

25,510.00

15%

A.4.5.2.11 Pemasangan 1M2 atap asbes gelombang 0.92m x 1.80m x 5mm A TENAGA Pekerja L.01 OH 0.140 Tukang Kayu L.03 OH 0.070 Kepala Tukang L.11 OH 0.007 Mandor L.15 OH 0.007 Jumlah Tenaga Kerja B BAHAN Asbes gel 92x250 Lembar 0.750 paku pancing 6x23 Kg 0.120 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C)

25,510.00 3,826.50 29,336.50

80,000.00 90,000.00 100,000.00 110,000.00

11,200.00 6,300.00 700.00 770.00 18,970.00

79,100.00 49,000.00

47,460.00 5,880.00 53,340.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

80,000.00 90,000.00 100,000.00 110,000.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

72,310.00

72,310.00 10,846.50 83,156.50

80,000.00 90,000.00 100,000.00 110,000.00

11,200.00 6,300.00 700.00 770.00 18,970.00

79,100.00 49,000.00

59,325.00 5,880.00 65,205.00

0.00 84,175.00

NO 1

URAIAN 2 E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

HARGA SATUAN (Rp.) 6 84,175.00

JUMLAH HARGA (Rp.) 7 12,626.25 96,801.25

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.5.2.12 Pemasangan 1M2 atap asbes gelombang 1.05m x 3.00m x 4mm A TENAGA Pekerja L.01 OH 0.140 Tukang Kayu L.03 OH 0.070 Kepala Tukang L.11 OH 0.007 Mandor L.15 OH 0.007 Jumlah Tenaga Kerja B BAHAN Asbes gel 92x250 Lembar 0.350 paku pancing 6x23 Kg 0.120 Jumlah Harga Bahan C PERALATAN

15%

A.4.5.2.13 Pemasangan 1M2 atap asbes gelombang 1.05m x 2.70m x 4mm A TENAGA Pekerja L.01 OH 0.140 Tukang Kayu L.03 OH 0.070 Kepala Tukang L.11 OH 0.007 Mandor L.15 OH 0.007 Jumlah Tenaga Kerja B BAHAN Asbes gel 92x250 Lembar 0.420 paku pancing 6x23 Kg 0.120 Jumlah Harga Bahan C PERALATAN

11,200.00 6,300.00 700.00 770.00 18,970.00

75,100.00 49,000.00

26,285.00 5,880.00 32,165.00

0.00

51,135.00

15%

A.4.5.2.14 Pemasangan 1M2 atap asbes gelombang 1.05m x 2.40m x 4mm A TENAGA Pekerja L.01 OH 0.140 Tukang Kayu L.03 OH 0.070 Kepala Tukang L.11 OH 0.007 Mandor L.15 OH 0.007 Jumlah Tenaga Kerja B BAHAN Asbes gel 92x250 Lebar 0.440 paku pancing 6x23 Kg 0.120 Jumlah Harga Bahan C PERALATAN

11,200.00 6,300.00 700.00 770.00 18,970.00

0.00 49,000.00

0.00 5,880.00 5,880.00

0.00

24,850.00

15%

24,850.00 3,727.50 28,577.50

80,000.00 90,000.00 100,000.00 110,000.00

11,200.00 6,300.00 700.00 770.00 18,970.00

0.00 21,600.00

0.00 2,592.00 2,592.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit

51,135.00 7,670.25 58,805.25

80,000.00 90,000.00 100,000.00 110,000.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

80,000.00 90,000.00 100,000.00 110,000.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

21,562.00

21,562.00 3,234.30

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

80,000.00 90,000.00 100,000.00 110,000.00

11,200.00 6,300.00 700.00 770.00 18,970.00

0.00 21,600.00

0.00 2,592.00 2,592.00

Jumlah Harga Alat

15%

A.4.5.2.16 Pemasangan 1M2 atap asbes gelombang 1.05m x 1.50m x 4mm A TENAGA Pekerja L.01 OH 0.140 Tukang Kayu L.03 OH 0.070 Kepala Tukang L.11 OH 0.007 Mandor L.15 OH 0.007 Jumlah Tenaga Kerja B BAHAN Asbes gel 92x250 Lebar 0.800 paku pancing 6x23 Kg 0.120 Jumlah Harga Bahan C PERALATAN

0.00

21,562.00

15%

A.4.5.2.17 Pemasangan 1M2 atap asbes gelombang 1.08m x 3.00m x 6mm A TENAGA Pekerja L.01 OH 0.140 Tukang Kayu L.03 OH 0.070 Kepala Tukang L.11 OH 0.007 Mandor L.15 OH 0.007 Jumlah Tenaga Kerja B BAHAN Asbes gel 92x250 Lebar 0.370 paku pancing 6x23 Kg 0.120 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C)

21,562.00 3,234.30 24,796.30

80,000.00 90,000.00 100,000.00 110,000.00

11,200.00 6,300.00 700.00 770.00 18,970.00

0.00 21,600.00

0.00 2,592.00 2,592.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7 24,796.30

A.4.5.2.15 Pemasangan 1M2 atap asbes gelombang 1.05m x 2.10m x 4mm A TENAGA Pekerja L.01 OH 0.140 Tukang Kayu L.03 OH 0.070 Kepala Tukang L.11 OH 0.007 Mandor L.15 OH 0.007 Jumlah Tenaga Kerja B BAHAN Asbes gel 92x250 Lebar 0.051 paku pancing 6x23 Kg 0.120 Jumlah Harga Bahan C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

21,562.00

21,562.00 3,234.30 24,796.30

80,000.00 90,000.00 100,000.00 110,000.00

11,200.00 6,300.00 700.00 770.00 18,970.00

0.00 21,600.00

0.00 2,592.00 2,592.00

0.00 21,562.00

NO 1

URAIAN 2 E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

HARGA SATUAN (Rp.) 6 21,562.00

A.4.5.2.18 Pemasangan 1M2 atap asbes gelombang 1.08m x 2.70m x 6mm A TENAGA Pekerja L.01 OH 0.140 Tukang Kayu L.03 OH 0.070 Kepala Tukang L.11 OH 0.007 Mandor L.15 OH 0.007 Jumlah Tenaga Kerja B BAHAN Asbes gel 92x250 Lebar 0.380 paku pancing 6x23 Kg 0.120 Jumlah Harga Bahan C PERALATAN

15%

A.4.5.2.19 Pemasangan 1M2 atap asbes gelombang 1.08m x 2.40m x 6mm A TENAGA Pekerja L.01 OH 0.140 Tukang Kayu L.03 OH 0.070 Kepala Tukang L.11 OH 0.007 Mandor L.15 OH 0.007 Jumlah Tenaga Kerja B BAHAN Asbes gel 92x250 Lebar 0.460 paku pancing 6x23 Kg 0.120 Jumlah Harga Bahan C PERALATAN

15%

A.4.5.2.20 Pemasangan 1M2 atap asbes gelombang 1.08m x 2.10m x 6mm A TENAGA Pekerja L.01 OH 0.140 Tukang Kayu L.03 OH 0.070 Kepala Tukang L.11 OH 0.007 Mandor L.15 OH 0.007 Jumlah Tenaga Kerja B BAHAN Asbes gel 92x250 Lebar 0.490 paku pancing 6x23 Kg 0.120 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat

3,234.30 24,796.30

11,200.00 6,300.00 700.00 770.00 18,970.00

0.00 21,600.00

0.00 2,592.00 2,592.00

0.00

21,562.00

21,562.00 3,234.30 24,796.30

80,000.00 90,000.00 100,000.00 110,000.00

11,200.00 6,300.00 700.00 770.00 18,970.00

0.00 21,600.00

0.00 2,592.00 2,592.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

80,000.00 90,000.00 100,000.00 110,000.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

21,562.00

21,562.00 3,234.30 24,796.30

80,000.00 90,000.00 100,000.00 110,000.00

11,200.00 6,300.00 700.00 770.00 18,970.00

0.00 21,600.00

0.00 2,592.00 2,592.00

0.00

NO 1

URAIAN 2 D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

15%

A.4.5.2.21 Pemasangan 1M2 atap asbes gelombang 1.08m x 1.80m x 6mm A TENAGA Pekerja L.01 OH 0.140 Tukang Kayu L.03 OH 0.070 Kepala Tukang L.11 OH 0.007 Mandor L.15 OH 0.007 Jumlah Tenaga Kerja B BAHAN Asbes gel 92x250 Lebar 0.570 paku pancing 6x23 Kg 0.120 Jumlah Harga Bahan C PERALATAN

21,562.00

A.4.5.2.22 Pemasangan 1M' bubung stel gelombang 0.92m A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN bubung stel gel paku skrup 3,5"

15%

7 21,562.00 3,234.30 24,796.30

80,000.00 90,000.00 100,000.00 110,000.00

11,200.00 6,300.00 700.00 770.00 18,970.00

0.00 21,600.00

0.00 2,592.00 2,592.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

21,562.00

21,562.00 3,234.30 24,796.30

OH OH OH OH

0.084 0.125 0.013 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,720.00 11,250.00 1,300.00 440.00 19,710.00

Lembar Bh

2.400 6.000 Jumlah Harga Bahan

0.00 0.00

0.00 0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.5.2.23 Pemasangan 1M' bubung stel gelombang 1.05m A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN bubung stel gel paku skrup 3,5"

15%

0.00

19,710.00

19,710.00 2,956.50 22,666.50

OH OH OH OH

0.084 0.125 0.013 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,720.00 11,250.00 1,300.00 440.00 19,710.00

Lembar Bh

2.100 6.000 Jumlah Harga Bahan

0.00 0.00

0.00 0.00 0.00

C PERALATAN Jumlah Harga Alat

0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.5.2.24 Pemasangan 1M' bubung stel gelombang 1.08m A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN bubung stel gel paku skrup 3,5"

HARGA SATUAN (Rp.) 6

15%

19,710.00

JUMLAH HARGA (Rp.) 7 19,710.00 2,956.50 22,666.50

OH OH OH OH

0.084 0.125 0.013 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,720.00 11,250.00 1,300.00 440.00 19,710.00

Lembar Bh

2.050 6.000 Jumlah Harga Bahan

0.00 0.00

0.00 0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.5.2.25 Pemasangan 1M' Nok paten 0.92m A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Nok paten 92 cm paku skrup 3,5"

15%

0.00

19,710.00

19,710.00 2,956.50 22,666.50

OH OH OH OH

0.084 0.125 0.013 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,720.00 11,250.00 1,300.00 440.00 19,710.00

Lembar Bh

1.200 6.000 Jumlah Harga Bahan

0.00 0.00

0.00 0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.5.2.26 Pemasangan 1M' Nok paten 1,05 m A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Nok paten 1,05 cm Paku skrup 3,5"

15%

0.00

19,710.00

19,710.00 2,956.50 22,666.50

OH OH OH OH

0.084 0.125 0.013 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,720.00 11,250.00 1,300.00 440.00 19,710.00

Lembar Bh

1.200 6.000 Jumlah Harga Bahan

0.00 0.00

0.00 0.00 0.00

C PERALATAN Jumlah Harga Alat

0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.5.2.27 Pemasangan 1M' Nok paten 1,08 m A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Nok paten 1,08 cm Paku skrup 3,5"

HARGA SATUAN (Rp.) 6

15%

19,710.00

JUMLAH HARGA (Rp.) 7 19,710.00 2,956.50 22,666.50

OH OH OH OH

0.084 0.125 0.013 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,720.00 11,250.00 1,300.00 440.00 19,710.00

Lembar Bh

1.200 6.000 Jumlah Harga Bahan

0.00 0.00

0.00 0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.5.2.28 Pemasangan 1M' Nok paten 0,92 m A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Nok paten 92 cm Paku skrup 3,5"

15%

0.00

19,710.00

19,710.00 2,956.50 22,666.50

OH OH OH OH

0.100 0.150 0.013 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

8,000.00 13,500.00 1,300.00 440.00 23,240.00

Lembar Bh

1.100 6.000 Jumlah Harga Bahan

0.00 0.00

0.00 0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.5.2.29 Pemasangan 1M' Nok stel rata 1,05 m A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Nok stel rata 1,05 m Paku skrup 3,5"

15%

0.00

23,240.00

23,240.00 3,486.00 26,726.00

OH OH OH OH

0.084 0.125 0.013 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,720.00 11,250.00 1,300.00 440.00 19,710.00

Lembar Bh

1.100 6.000 Jumlah Harga Bahan

0.00 0.00

0.00 0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C)

0.00 19,710.00

NO 1

URAIAN 2 E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

A.4.5.2.30 Pemasangan 1 M2 genteng beton A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Genteng beton Paku biasa 2"-5"

HARGA SATUAN (Rp.) 6 19,710.00

JUMLAH HARGA (Rp.) 7 2,956.50 22,666.50

OH OH OH OH

0.200 0.100 0.010 0.010 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

16,000.00 9,000.00 1,000.00 1,100.00 27,100.00

Bh Kg

11.000 0.030 Jumlah Harga Bahan

5,500.00 16,400.00

60,500.00 492.00 60,992.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.5.2.31 Pemasangan 1 M2 genteng aspal A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Genteng aspal Plywood 6 mm Paku biasa 1/2"-1" Plastic aerator

15%

0.00

88,092.00

80,000.00 90,000.00 100,000.00 110,000.00

88,092.00 13,213.80 101,305.80

OH OH OH OH

0.200 0.300 0.003 0.010 Jumlah Tenaga Kerja

16,000.00 27,000.00 300.00 1,100.00 44,400.00

Bh Lembar Kg Bh

6.900 0.350 0.030 0.050 Jumlah Harga Bahan

0.00 0.00 0.00 0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.5.2.32 Pemasangan 1 M2 genteng metal ukuran 80x100 atap pelana A TENAGA Pekerja L.01 OH Tukang Kayu L.03 OH Kepala Tukang L.11 OH Mandor L.15 OH B BAHAN Genteng metal Paku biasa 1/2"-1"

Bh Kg

0.200 0.100 0.010 0.001 Jumlah Tenaga Kerja

44,400.00

80,000.00 90,000.00 100,000.00 110,000.00

44,400.00 6,660.00 51,060.00

16,000.00 9,000.00 1,000.00 110.00 26,110.00

1.300 0.200 Jumlah Harga Bahan

0.00 0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C)

26,110.00

NO 1

URAIAN 2 E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

A.4.5.2.33 Pemasangan 1 M2 genteng metal ukuran 80x100 atap jurai A TENAGA Pekerja L.01 OH Tukang Kayu L.03 OH Kepala Tukang L.11 OH Mandor L.15 OH B BAHAN Genteng metal Paku biasa 1/2"-1"

Bh Kg

HARGA SATUAN (Rp.) 6 26,110.00

0.200 0.100 0.010 0.001 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

JUMLAH HARGA (Rp.) 7 3,916.50 30,026.50

16,000.00 9,000.00 1,000.00 110.00 26,110.00

2.000 0.200 Jumlah Harga Bahan

0.00 0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.5.2.34 Pemasangan 1 M2 atap sirap kayu A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Sirap kayu Paku biasa 1/2"-1"

15%

26,110.00

80,000.00 90,000.00 100,000.00 110,000.00

26,110.00 3,916.50 30,026.50

OH OH OH OH

0.166 0.250 0.025 0.008 Jumlah Tenaga Kerja

13,280.00 22,500.00 2,500.00 880.00 39,160.00

Bh Kg

30.000 0.200 Jumlah Harga Bahan

0.00 0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.5.2.35 Pemasangan 1 M' nok genteng beton A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Nok genteng beton Paku biasa 1/2"-1" Semen PC Pasir pasang Semen warna

15%

OH OH OH OH

0.400 0.200 0.020 0.020 Jumlah Tenaga Kerja

Bh Kg Kg M3 Kg

3.5 0.05 10.8 0.032 1.000 Jumlah Harga Bahan

39,160.00

80,000.00 90,000.00 100,000.00 110,000.00

2,300.00 9,800.00 53,900.00 21,600.00

39,160.00 5,874.00 45,034.00

32,000.00 18,000.00 2,000.00 2,200.00 54,200.00 0.00 115.00 105,840.00 1,724.80 21,600.00 129,279.80

C PERALATAN Jumlah Harga Alat

0.00

NO 1

URAIAN 2 D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

15%

A.4.5.2.36 Pemasangan 1 M' nok genteng aspal A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Nok genteng aspal Paku biasa 1/2"-1" Kayu balok borneo

OH OH OH OH

0.125 0.250 0.025 0.006 Jumlah Tenaga Kerja

Bh Kg Kg

3.5 0.05 10.8 Jumlah Harga Bahan

183,479.80

80,000.00 90,000.00 100,000.00 110,000.00

16,400.00

JUMLAH HARGA (Rp.) 7 183,479.80 27,521.97 211,001.77

10,000.00 22,500.00 2,500.00 660.00 35,660.00 0.00 820.00 0.00 820.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.5.2.37 Pemasangan 1 M' nok genteng metal A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Nok genteng metal Paku biasa 1/2"-1"

OH OH OH OH

0.250 0.150 0.015 0.013 Jumlah Tenaga Kerja

Bh Kg

1.1 0.05 Jumlah Harga Bahan

0.00

36,480.00

80,000.00 90,000.00 100,000.00 110,000.00

16,400.00

36,480.00 5,472.00 41,952.00

20,000.00 13,500.00 1,500.00 1,430.00 36,430.00 0.00 820.00 820.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.5.2.38 Pemasangan 1 M' nok sirap A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor B BAHAN Seng plat Paku biasa 1/2"-1" Paku biasa 2"-5"

15%

L.01 L.03 L.11 L.15

0.00

37,250.00

37,250.00 5,587.50 42,837.50

OH OH OH OH

0.125 0.250 0.025 0.006 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

10,000.00 22,500.00 2,500.00 660.00 35,660.00

Lbr Kg Kg

0.4 0.05 0.05 Jumlah Harga Bahan

23,700.00 16,400.00 16,400.00

9,480.00 820.00 820.00 11,120.00

C PERALATAN Jumlah Harga Alat

0.00

NO 1

URAIAN 2 D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

15%

A.4.5.2.39 Pemasangan 1 M' atap seng gelombang A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Seng gel 3x6" Paku biasa 1/2"-1"

46,780.00

JUMLAH HARGA (Rp.) 7 46,780.00 7,017.00 53,797.00

OH OH OH OH

0.120 0.060 0.006 0.006 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

9,600.00 5,400.00 600.00 660.00 16,260.00

Lbr Kg

0.7 0.02 Jumlah Harga Bahan

91,300.00 16,400.00

63,910.00 328.00 64,238.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.5.2.40 Pemasangan 1 M' nok atap seng A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

15%

L.01 L.03 L.11 L.15

B BAHAN Seng plat gel 3"x6" bjls 28 Paku biasa 1/2"-1"

0.00

80,498.00

80,498.00 12,074.70 92,572.70

OH OH OH OH

0.150 0.070 0.007 0.006 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

12,000.00 6,300.00 700.00 660.00 19,660.00

Lbr Kg

0.3 0.04 Jumlah Harga Bahan

23,700.00 16,400.00

7,110.00 656.00 7,766.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.5.2.41 Pemasangan 1 M' atap alumunium A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Almn gel tbl 0,55 Paku hak panjang 15 cm

15%

0.00

27,426.00

80,000.00 90,000.00 100,000.00 110,000.00

27,426.00 4,113.90 31,539.90

OH OH OH OH

0.150 0.750 0.080 0.006 Jumlah Tenaga Kerja

12,000.00 67,500.00 8,000.00 660.00 88,160.00

Lbr Kg

1.05 0.02 Jumlah Harga Bahan

0.00 0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit

15%

88,160.00

88,160.00 13,224.00

NO 1

URAIAN

HARGA SATUAN (Rp.) 6

KODE

SAT

KOEFISIEN

3

4

5

L.01 L.03 L.11 L.15

OH OH OH OH

0.100 1.000 0.100 0.050 Jumlah Tenaga Kerja

Lbr Kg

1.2 0.04 Jumlah Harga Bahan

0.00 0.00 0.00

Jumlah Harga Alat

0.00

2 F Harga Satuan Pekerjaaan (D+E)

A.4.5.2.42 Pemasangan 1 M' nok alumunium A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor B BAHAN Nok standar 40x18 Paku hak panjang 15 cm

80,000.00 90,000.00 100,000.00 110,000.00

JUMLAH HARGA (Rp.) 7 101,384.00

8,000.00 90,000.00 10,000.00 5,500.00 113,500.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.5.2.43 Pemasangan 1 M2 alumunium foil/sisalation A TENAGA Pekerja L.01 Tukang Kayu L.03 Kepala Tukang L.11 Mandor L.15 B BAHAN Aluminum foil

15%

113,500.00

80,000.00 90,000.00 100,000.00 110,000.00

113,500.00 17,025.00 130,525.00

OH OH OH OH

0.150 0.050 0.005 0.008 Jumlah Tenaga Kerja

12,000.00 4,500.00 500.00 880.00 17,880.00

M2

1.05 Jumlah Harga Bahan

0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

17,880.00

17,880.00 2,682.00 20,562.00

A.4.6.1.1 HARGA SATUAN PEKERJAAN KAYU A.4.6.1.1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I A TENAGA Pekerja L.01 OH 7.000 80,000.00 Tukang Kayu L.02 OH 21.000 90,000.00 Kepala Tukang L.03 OH 2.100 100,000.00 Mandor L.04 OH 0.350 110,000.00 Jumlah Tenaga Kerja B BAHAN Balok kayu M3 1.1 18,000,000.00 Paku 10 cm Kg 1.25 16,400.00 Lem kayu Kg 1.000 12,800.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit

15%

560,000.00 1,890,000.00 210,000.00 38,500.00 2,698,500.00 19,800,000.00 20,500.00 12,800.00 19,833,300.00

0.00

22,531,800.00

22,531,800.00 3,379,770.00

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

A.4.6.1.2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau kelas III A TENAGA Pekerja L.01 OH 6.000 80,000.00 Tukang Kayu L.02 OH 18.000 90,000.00 Kepala Tukang L.03 OH 1.800 100,000.00 Mandor L.04 OH 0.300 110,000.00 Jumlah Tenaga Kerja B BAHAN Balok kayu M3 1.2 5,720,000.00 Paku 10 cm Kg 1.25 16,400.00 Lem kayu Kg 1.000 12,800.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.6.1.3 Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II A TENAGA Pekerja L.01 OH 0.350 Tukang Kayu L.02 OH 1.050 Kepala Tukang L.03 OH 0.105 Mandor L.04 OH 0.018 Jumlah Tenaga Kerja B BAHAN Papan kayu M3 0.04 Paku 5-7 cm Kg 0.05 Jumlah Harga Bahan C PERALATAN

15%

A.4.6.1.4 Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas III A TENAGA Pekerja L.01 OH 0.350 Tukang Kayu L.02 OH 1.050 Kepala Tukang L.03 OH 0.105 Mandor L.04 OH 0.018 Jumlah Tenaga Kerja B BAHAN Papan kayu M3 0.04 Paku 5-7 cm Kg 0.05 Jumlah Harga Bahan C PERALATAN

9,210,300.00

15%

480,000.00 1,620,000.00 180,000.00 33,000.00 2,313,000.00 6,864,000.00 20,500.00 12,800.00 6,897,300.00

9,210,300.00 1,381,545.00 10,591,845.00

80,000.00 90,000.00 100,000.00 110,000.00

28,000.00 94,500.00 10,500.00 1,980.00 134,980.00

8,312,500.00 16,400.00

332,500.00 820.00 333,320.00

0.00

468,300.00

468,300.00 70,245.00 538,545.00

80,000.00 90,000.00 100,000.00 110,000.00

28,000.00 94,500.00 10,500.00 1,980.00 134,980.00

5,583,300.00 16,400.00

223,332.00 820.00 224,152.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7 25,911,570.00

0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

359,132.00

359,132.00 53,869.80 413,001.80

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.6.1.5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau kelas II A TENAGA Pekerja L.01 OH 1.000 80,000.00 Tukang Kayu L.02 OH 3.000 90,000.00 Kepala Tukang L.03 OH 0.300 100,000.00 Mandor L.04 OH 0.050 110,000.00 Jumlah Tenaga Kerja B BAHAN Papan kayu M3 0.04 25,000,000.00 Paku 5-7 cm Kg 0.05 16,400.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

1,386,320.00

Jumlah Harga Alat

15%

913,320.00

Jumlah Harga Alat

15%

80,000.00 270,000.00 30,000.00 5,500.00 385,500.00 1,000,000.00 820.00 1,000,820.00

1,386,320.00 207,948.00 1,594,268.00

64,000.00 216,000.00 24,000.00 4,400.00 308,400.00 600,000.00 4,920.00 604,920.00

0.00

A.4.6.1.7 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II A TENAGA Pekerja L.01 OH 1.000 80,000.00 Tukang Kayu L.02 OH 3.000 90,000.00 Kepala Tukang L.03 OH 0.300 100,000.00 Mandor L.04 OH 0.050 110,000.00 Jumlah Tenaga Kerja B BAHAN Papan kayu M3 0.064 25,000,000.00 Paku 5-7 cm Kg 0.5 16,400.00 Jumlah Harga Bahan C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

0.00

A.4.6.1.6 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II A TENAGA Pekerja L.01 OH 0.800 80,000.00 Tukang Kayu L.02 OH 2.400 90,000.00 Kepala Tukang L.03 OH 0.240 100,000.00 Mandor L.04 OH 0.040 110,000.00 Jumlah Tenaga Kerja B BAHAN Papan kayu M3 0.024 25,000,000.00 Paku 5-7 cm Kg 0.3 16,400.00 Jumlah Harga Bahan C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

913,320.00 136,998.00 1,050,318.00

80,000.00 270,000.00 30,000.00 5,500.00 385,500.00 1,600,000.00 8,200.00 1,608,200.00

0.00

1,993,700.00

A.4.6.1.8 Pembuatan 1 m2 daun pintu plywood rangkap rangka kayu kelas II tertutup (lebar sampai 90 cm)

1,993,700.00 299,055.00 2,292,755.00

NO

HARGA SATUAN (Rp.) 6

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

L.01 L.02 L.03 L.04

OH OH OH OH

0.700 2.100 0.210 0.035 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

56,000.00 189,000.00 21,000.00 3,850.00 269,850.00

M3 Kg Kg Lembar

0.025 0.03 0.5 1 Jumlah Harga Bahan

9,516,600.00 16,400.00 12,800.00

237,915.00 492.00 6,400.00 0.00 244,807.00

1 A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

B BAHAN Papan kayu Paku 1 cm - 2, 5 cm Lem kayu Plywood tebal 4 mm ukuran (90x220) cm

JUMLAH HARGA (Rp.) 7

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

514,657.00

A.4.6.1.9 Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II A TENAGA Pekerja L.01 OH 0.800 80,000.00 Tukang Kayu L.02 OH 2.400 90,000.00 Kepala Tukang L.03 OH 0.240 100,000.00 Mandor L.04 OH 0.040 110,000.00 Jumlah Tenaga Kerja B BAHAN Papan kayu M3 0.0256 25,000,000.00 Paku 1 cm - 2, 5 cm Kg 0.03 16,400.00 Lem kayu Kg 0.5 12,800.00 Plywood tebal 4 mm ukuran (90x220) cm Lembar 1 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.6.1.10 Pembuatan 1 m2 jalusi kusen , kayu kelas I atau II A TENAGA Pekerja L.01 OH Tukang Kayu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Papan kayu Paku 1 cm - 2, 5 cm

M3 Kg

0.670 2.000 0.200 0.335 Jumlah Tenaga Kerja

514,657.00 77,198.55 591,855.55

64,000.00 216,000.00 24,000.00 4,400.00 308,400.00 640,000.00 492.00 6,400.00 0.00 646,892.00

0.00

955,292.00

955,292.00 143,293.80 1,098,585.80

80,000.00 90,000.00 100,000.00 110,000.00

53,600.00 180,000.00 20,000.00 36,850.00 290,450.00

0.0256 25,000,000.00 0.03 16,400.00 Jumlah Harga Bahan

640,000.00 492.00 640,492.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

930,942.00

930,942.00 139,641.30 1,070,583.30

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

A.4.6.1.11 Pemasangan 1 m2 teakwood rangkap , rangka expose kayu kelas I A TENAGA Pekerja L.01 OH 0.800 80,000.00 Tukang Kayu L.02 OH 2.400 90,000.00 Kepala Tukang L.03 OH 0.240 100,000.00 Mandor L.04 OH 0.040 110,000.00 Jumlah Tenaga Kerja B BAHAN Papan kayu M3 0.025 25,000,000.00 Paku 1 cm - 2, 5 cm Kg 0.03 16,400.00 Lem kayu Kg 0.3 12,800.00 Teakwood tebal 4 mm ukuran (90x220) cm Lembar 1 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.6.1.12 Pemasangan 1 m2 teakwood rangkap lapis formika , rangka expose kayu kelas II A TENAGA Pekerja L.01 OH 0.850 Tukang Kayu L.02 OH 2.550 Kepala Tukang L.03 OH 0.255 Mandor L.04 OH 0.043 Jumlah Tenaga Kerja B BAHAN Papan kayu M3 0.025 Paku 1 cm - 2, 5 cm Kg 0.03 Lem kayu Kg 0.8 Teakwood tebal 4 mm ukuran (90x220) cm Lembar 1 Formika Lembar 0.5 Jumlah Harga Bahan C PERALATAN

15%

937,732.00

64,000.00 216,000.00 24,000.00 4,400.00 308,400.00 625,000.00 492.00 3,840.00 0.00 629,332.00

937,732.00 140,659.80 1,078,391.80

80,000.00 90,000.00 100,000.00 110,000.00

68,000.00 229,500.00 25,500.00 4,730.00 327,730.00

9,516,600.00 16,400.00 12,800.00

237,915.00 492.00 10,240.00 0.00 0.00 248,647.00

0.00

576,377.00

A.4.6.1.13 Pemasangan 1 m3 konstruksi kuda-kuda konvensional kayu kelas I, II dan III bentang 6 m A TENAGA Pekerja L.01 OH 4.000 80,000.00 Tukang Kayu L.02 OH 12.000 90,000.00 Kepala Tukang L.03 OH 1.200 100,000.00 Mandor L.04 OH 0.200 110,000.00 Jumlah Tenaga Kerja B BAHAN Balok Kayu jati M3 1.1 18,000,000.00 Besi strip tebal 5 mm Kg 15 13,420.00 Paku 12 cm Kg 5.6 16,400.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat

7

0.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

576,377.00 86,456.55 662,833.55

320,000.00 1,080,000.00 120,000.00 22,000.00 1,542,000.00 19,800,000.00 201,300.00 91,840.00 20,093,140.00

0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.6.1.14 Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I A TENAGA Pekerja L.01 OH Tukang Kayu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Balok kayu jati Besi strip tebal 5 mm Paku 12 cm

HARGA SATUAN (Rp.) 6

M3 Kg Kg

6.700 20.100 2.010 0.335 Jumlah Tenaga Kerja

21,635,140.00

JUMLAH HARGA (Rp.) 7 21,635,140.00 3,245,271.00 24,880,411.00

80,000.00 90,000.00 100,000.00 110,000.00

536,000.00 1,809,000.00 201,000.00 36,850.00 2,582,850.00

1.2 18,000,000.00 15 13,420.00 5.6 16,400.00 Jumlah Harga Bahan

21,600,000.00 201,300.00 91,840.00 21,893,140.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.6.1.15 Pemasangan 1 m3 konstruksi gording, kayu kelas II A TENAGA Pekerja L.01 OH Tukang Kayu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Balok kayu meranti Besi strip tebal 5 mm Paku 12 cm

M3 Kg Kg

0.00

24,475,990.00

24,475,990.00 3,671,398.50 28,147,388.50

6.700 20.100 2.010 0.335 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

536,000.00 1,809,000.00 201,000.00 36,850.00 2,582,850.00

1.1 15 3 Jumlah Harga Bahan

5,419,400.00 13,420.00 16,400.00

5,961,340.00 201,300.00 49,200.00 6,211,840.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.6.1.16 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II A TENAGA Pekerja L.01 OH Tukang Kayu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Kaso-kaso 5 x 7 cm Reng 2 x 3 cm Paku 5 dan 10 cm C PERALATAN

M3 M3 Kg

0.00

8,794,690.00

8,794,690.00 1,319,203.50 10,113,893.50

0.100 0.100 0.010 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

8,000.00 9,000.00 1,000.00 550.00 18,550.00

0.014 0.036 0.25 Jumlah Harga Bahan

5,419,400.00 5,419,400.00 16,400.00

75,871.60 195,098.40 4,100.00 275,070.00

NO

URAIAN

KODE

SAT

1

2

3

4

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

5 Jumlah Harga Alat

HARGA SATUAN (Rp.) 6

15%

A.4.6.1.17 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II A TENAGA Pekerja L.01 OH Tukang Kayu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Kaso-kaso 5 x 7 cm Reng 2 x 3 cm Paku 5 dan 10 cm

KOEFISIEN

M3 M3 Kg

JUMLAH HARGA (Rp.) 7 0.00

293,620.00

293,620.00 44,043.00 337,663.00

0.100 0.100 0.010 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

8,000.00 9,000.00 1,000.00 550.00 18,550.00

0.014 0.057 0.25 Jumlah Harga Bahan

5,419,400.00 5,419,400.00 16,400.00

75,871.60 308,905.80 4,100.00 388,877.40

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.6.1.18 Pemasangan 1 m2 rangka atap sirap, kayu kelas II A TENAGA Pekerja L.01 OH Tukang Kayu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Kayu kelas II Paku 5-10 cm

M3 Kg

0.00

407,427.40

407,427.40 61,114.11 468,541.51

0.120 0.120 0.012 0.006 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

9,600.00 10,800.00 1,200.00 660.00 22,260.00

0.014 0.057 Jumlah Harga Bahan

6,877,000.00 16,400.00

96,278.00 934.80 97,212.80

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.6.1.19 Pemasangan 1 m2 rangka langit-langit (50x100) cm, kayu kelas II atau III A TENAGA Pekerja L.01 OH 0.150 Tukang Kayu L.02 OH 0.300 Kepala Tukang L.03 OH 0.030 Mandor L.04 OH 0.075 Jumlah Tenaga Kerja B BAHAN Kaso-kaso 5 x 7 cm M3 0.0154 Paku 7-10 cm Kg 0.2 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat

0.00

119,472.80

119,472.80 17,920.92 137,393.72

80,000.00 90,000.00 100,000.00 110,000.00

12,000.00 27,000.00 3,000.00 8,250.00 50,250.00

6,877,000.00 16,400.00

105,905.80 3,280.00 109,185.80

0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

HARGA SATUAN (Rp.) 6

15%

A.4.6.1.20 Pemasangan 1 m2 rangka langit-langit (60x60) cm, kayu kelas II atau III A TENAGA Pekerja L.01 OH 0.200 Tukang Kayu L.02 OH 0.300 Kepala Tukang L.03 OH 0.030 Mandor L.04 OH 0.010 Jumlah Tenaga Kerja B BAHAN Kaso-kaso 5 x 7 cm kelas II M3 0.0163 Paku 7-10 cm Kg 0.25 Jumlah Harga Bahan C PERALATAN

159,435.80

15%

6,877,000.00 16,400.00

112,095.10 4,100.00 116,195.10

0.00

163,295.10

Jumlah Harga Alat

15%

D Jumlah (A+B+C)

163,295.10 24,494.27 187,789.37

8,000.00 18,000.00 2,000.00 550.00 28,550.00 270,000.00 1,640.00 271,640.00

0.00

300,190.00

A.4.6.1.22 Pemasangan 1 m' lisplank ukuran (3x30) cm, kayu kelas I atau II A TENAGA Pekerja L.01 OH 0.100 80,000.00 Tukang Kayu L.02 OH 0.200 90,000.00 Kepala Tukang L.03 OH 0.020 100,000.00 Mandor L.04 OH 0.005 110,000.00 Jumlah Tenaga Kerja B BAHAN Papan kayu kelas I M3 0.011 25,000,000.00 Paku 5 dan 7 cm Kg 0.05 16,400.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat

159,435.80 23,915.37 183,351.17

16,000.00 27,000.00 3,000.00 1,100.00 47,100.00

A.4.6.1.21 Pemasangan 1 m' lisplank ukuran (3x20) cm, kayu kelas I atau II A TENAGA Pekerja L.01 OH 0.100 80,000.00 Tukang Kayu L.02 OH 0.200 90,000.00 Kepala Tukang L.03 OH 0.020 100,000.00 Mandor L.04 OH 0.005 110,000.00 Jumlah Tenaga Kerja B BAHAN Papan kayu kelas I M3 0.0108 25,000,000.00 Paku 5 dan 7 cm Kg 0.1 16,400.00 Jumlah Harga Bahan C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

80,000.00 90,000.00 100,000.00 110,000.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

300,190.00 45,028.50 345,218.50

8,000.00 18,000.00 2,000.00 550.00 28,550.00 275,000.00 820.00 275,820.00

0.00 304,370.00

NO 1

URAIAN 2 E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

HARGA SATUAN (Rp.) 6 304,370.00

A.4.6.1.23 Pemasangan 1 m2 rangka dinding pemisah (60x120) cm, kayu kelas II atau III A TENAGA Pekerja L.01 OH 0.150 Tukang Kayu L.02 OH 0.450 Kepala Tukang L.03 OH 0.045 Mandor L.04 OH 0.008 Jumlah Tenaga Kerja B BAHAN Balok kayu M3 0.028 Paku 5 dan 7 cm Kg 0.15 Jumlah Harga Bahan C PERALATAN

15%

A.4.6.1.24 Pemasangan 1 m2 rangka dinding pemisah teakwood rangkap, rangka kayu kelas II A TENAGA Pekerja L.01 OH 0.150 Tukang Kayu L.02 OH 0.450 Kepala Tukang L.03 OH 0.045 Mandor L.04 OH 0.008 Jumlah Tenaga Kerja B BAHAN Balok kayu 6 x 12 M3 0.028 Paku 5 dan 10 cm Kg 0.15 Teakwood 4 mm, 120 x 240 Lembar 0.86 Lem kayu Kg 0.56 Jumlah Harga Bahan C PERALATAN

15%

A.4.6.1.25 Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II A TENAGA Pekerja L.01 OH 0.200 Tukang Kayu L.02 OH 0.600 Kepala Tukang L.03 OH 0.060 Mandor L.04 OH 0.010 Jumlah Tenaga Kerja B BAHAN Balok kayu 6 x 12 M3 0.028 Paku 5 dan 10 cm Kg 0.15 Plywood 4 mm, 120 x 240 Lembar 0.86 Lem kayu Kg 0.56 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat

45,655.50 350,025.50

12,000.00 40,500.00 4,500.00 880.00 57,880.00

6,877,000.00 16,400.00

192,556.00 2,460.00 195,016.00

0.00

252,896.00

252,896.00 37,934.40 290,830.40

80,000.00 90,000.00 100,000.00 110,000.00

12,000.00 40,500.00 4,500.00 880.00 57,880.00

6,877,000.00 16,400.00

192,556.00 2,460.00 0.00 7,168.00 202,184.00

12,800.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

80,000.00 90,000.00 100,000.00 110,000.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

JUMLAH HARGA (Rp.)

0.00

260,064.00

260,064.00 39,009.60 299,073.60

80,000.00 90,000.00 100,000.00 110,000.00

16,000.00 54,000.00 6,000.00 1,100.00 77,100.00

6,877,000.00 16,400.00

192,556.00 2,460.00 0.00 7,168.00 202,184.00

12,800.00

0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.6.1.26 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I A TENAGA Pekerja L.01 OH Tukang Kayu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Papan kayu Paku 5 dan 10 cm Paku skrup 10 cm

HARGA SATUAN (Rp.) 6

M3 Kg Kg

0.600 1.800 0.180 0.030 Jumlah Tenaga Kerja

279,284.00

JUMLAH HARGA (Rp.) 7 279,284.00 41,892.60 321,176.60

80,000.00 90,000.00 100,000.00 110,000.00

48,000.00 162,000.00 18,000.00 3,300.00 231,300.00

0.007 25,000,000.00 0.1 16,400.00 0.15 300.00 Jumlah Harga Bahan

175,000.00 1,640.00 45.00 176,685.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.6.1.27 Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120x240) cm A TENAGA Pekerja L.01 OH 0.025 Tukang Kayu L.02 OH 0.075 Kepala Tukang L.03 OH 0.008 Mandor L.04 OH 0.001 Jumlah Tenaga Kerja B BAHAN Plywood 4 mm M3 0.4 Paku 1 dan 2,5 Kg 0.05 Jumlah Harga Bahan C PERALATAN

0.00

407,985.00

80,000.00 90,000.00 100,000.00 110,000.00

16,400.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.6.1.28 Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV A TENAGA Pekerja L.01 OH Tukang Kayu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Bilik bambu Kaso-kaso 5 x 7 Paku List kayu 2/4 C PERALATAN

M2 M3 Kg M3

0.100 0.050 0.005 0.005 Jumlah Tenaga Kerja 1.5 0.014 0.012 0.003 Jumlah Harga Bahan

407,985.00 61,197.75 469,182.75

2,000.00 6,750.00 800.00 110.00 9,660.00 0.00 820.00 820.00

0.00

10,480.00

80,000.00 90,000.00 100,000.00 110,000.00

5,500,000.00 16,400.00

10,480.00 1,572.00 12,052.00

8,000.00 4,500.00 500.00 550.00 13,550.00 0.00 77,000.00 196.80 0.00 77,196.80

NO

URAIAN

KODE

SAT

1

2

3

4

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA A.4.6.2.1 Pemasangan 1 buah kunci tanam antik A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kunci tanam antik

KOEFISIEN 5 Jumlah Harga Alat

HARGA SATUAN (Rp.) 6

15%

JUMLAH HARGA (Rp.) 7 0.00

90,746.80

80,000.00 90,000.00 100,000.00 110,000.00

90,746.80 13,612.02 104,358.82

OH OH OH OH

0.060 0.600 0.060 0.003 Jumlah Tenaga Kerja

4,800.00 54,000.00 6,000.00 330.00 65,130.00

Bh

1.000 Jumlah Harga Bahan

0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.2 Pemasangan 1 buah kunci tanam biasa A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kunci tanam biasa

15%

65,130.00

80,000.00 90,000.00 100,000.00 110,000.00

65,130.00 9,769.50 74,899.50

OH OH OH OH

0.010 0.500 0.050 0.005 Jumlah Tenaga Kerja

800.00 45,000.00 5,000.00 550.00 51,350.00

Bh

1.000 Jumlah Harga Bahan

0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.3 Pemasangan 1 buah kunci kamar mandi A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kunci tanam KM

15%

51,350.00

80,000.00 90,000.00 100,000.00 110,000.00

51,350.00 7,702.50 59,052.50

OH OH OH OH

0.005 0.500 0.050 0.003 Jumlah Tenaga Kerja

400.00 45,000.00 5,000.00 330.00 50,730.00

Bh

1.000 Jumlah Harga Bahan

0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit

15%

50,730.00

50,730.00 7,609.50

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

A.4.6.2.4 Pemasangan 1 buah kunci silinder A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7 58,339.50

L.01 L.02 L.03 L.04

B BAHAN Kunci Silinder

OH OH OH OH

0.005 0.500 0.050 0.003 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

400.00 45,000.00 5,000.00 330.00 50,730.00

Bh

1.000 Jumlah Harga Bahan

0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.5 Pemasangan 1 buah engsel pintu A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

15%

L.01 L.02 L.03 L.04

B BAHAN Engsel pintu

50,730.00

50,730.00 7,609.50 58,339.50

OH OH OH OH

0.015 0.150 0.015 0.0008 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

1,200.00 13,500.00 1,500.00 88.00 16,288.00

Bh

1.000 Jumlah Harga Bahan

31,200.00

31,200.00 31,200.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Engsel kupu-kupu

15%

0.00

47,488.00

47,488.00 7,123.20 54,611.20

OH OH OH OH

0.010 0.100 0.010 0.0005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

800.00 9,000.00 1,000.00 55.00 10,855.00

Bh

1.000 Jumlah Harga Bahan

15,200.00

15,200.00 15,200.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.7 Pemasangan 1 buah engsel angin A TENAGA

15%

0.00

26,055.00

26,055.00 3,908.25 29,963.25

NO

URAIAN

KODE

SAT

2

3 L.01 L.02 L.03 L.04

4 OH OH OH OH

1 Pekerja Tukang Kayu Kepala Tukang Mandor

B BAHAN Engsel kupu-kupu

Bh

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.100 80,000.00 8,000.00 0.200 90,000.00 18,000.00 0.020 100,000.00 2,000.00 0.0005 110,000.00 55.00 Jumlah Tenaga Kerja 28,055.00 KOEFISIEN

1.000 Jumlah Harga Bahan

15,200.00

15,200.00 15,200.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.8 Pemasangan 1 buah spring knip A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

15%

L.01 L.02 L.03 L.04

B BAHAN Spring knip

0.00

43,255.00

43,255.00 6,488.25 49,743.25

OH OH OH OH

0.015 0.150 0.015 0.0080 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

1,200.00 13,500.00 1,500.00 880.00 17,080.00

Bh

1.000 Jumlah Harga Bahan

0.00

0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.9 Pemasangan 1 buah kait angin A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

15%

L.01 L.02 L.03 L.04

B BAHAN Kait angin

0.00

17,080.00

17,080.00 2,562.00 19,642.00

OH OH OH OH

0.015 0.150 0.015 0.0080 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

1,200.00 13,500.00 1,500.00 880.00 17,080.00

Bh

1.000 Jumlah Harga Bahan

15,100.00

15,100.00 15,100.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.10 Pemasangan 1 buah door closer A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

15%

L.01 L.02 L.03 L.04

OH OH OH OH

0.050 0.500 0.050 0.0030 Jumlah Tenaga Kerja

0.00

32,180.00

80,000.00 90,000.00 100,000.00 110,000.00

32,180.00 4,827.00 37,007.00

4,000.00 45,000.00 5,000.00 330.00 54,330.00

NO 1

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

B BAHAN Door closer

Set

HARGA SATUAN (Rp.) 6

1.000 Jumlah Harga Bahan

198,700.00

JUMLAH HARGA (Rp.) 7 198,700.00 198,700.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.11 Pemasangan 1 buah kunci slot A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

15%

L.01 L.02 L.03 L.04

B BAHAN Kunci slot

0.00

253,030.00

253,030.00 37,954.50 290,984.50

OH OH OH OH

0.020 0.200 0.020 0.0010 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

1,600.00 18,000.00 2,000.00 110.00 21,710.00

Bh

1.000 Jumlah Harga Bahan

90,900.00

90,900.00 90,900.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.12 Pemasangan 1 buah Door holder A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

15%

L.01 L.02 L.03 L.04

B BAHAN Door holder

0.00

112,610.00

112,610.00 16,891.50 129,501.50

OH OH OH OH

0.050 0.500 0.050 0.0030 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

4,000.00 45,000.00 5,000.00 330.00 54,330.00

Bh

1.000 Jumlah Harga Bahan

160,000.00

160,000.00 160,000.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.13 Pemasangan 1 buah Door stop A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor B BAHAN Door stop

15%

L.01 L.02 L.03 L.04

214,330.00

0.00 214,330.00 32,149.50 246,479.50

OH OH OH OH

0.010 0.100 0.010 0.0050 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

800.00 9,000.00 1,000.00 550.00 11,350.00

Bh

1.000 Jumlah Harga Bahan

30,900.00

30,900.00 30,900.00

C PERALATAN Jumlah Harga Alat

0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

HARGA SATUAN (Rp.) 6

15%

A.4.6.2.14 Pemasangan 1 buah rel pintu sorong A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Rel pintu sorong

42,250.00

JUMLAH HARGA (Rp.) 7 42,250.00 6,337.50 48,587.50

OH OH OH OH

0.060 0.600 0.060 0.0030 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

4,800.00 54,000.00 6,000.00 330.00 65,130.00

Set

1.000 Jumlah Harga Bahan

0.00

0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.15 Pemasangan 1 buah kunci lemari A TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

15%

L.01 L.02 L.03 L.04

B BAHAN Kunci lemari

0.00

65,130.00

80,000.00 90,000.00 100,000.00 110,000.00

65,130.00 9,769.50 74,899.50

OH OH OH OH

0.025 0.250 0.025 0.0013 Jumlah Tenaga Kerja

2,000.00 22,500.00 2,500.00 143.00 27,143.00

set

1.000 Jumlah Harga Bahan

0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.16 Pemasangan 1 m 2 kaca tebal 3 mm A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kaca tebal 3 mm Sealent

15%

27,143.00

27,143.00 4,071.45 31,214.45

OH OH OH OH

0.015 0.150 0.015 0.0008 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

1,200.00 13,500.00 1,500.00 88.00 16,288.00

M2 Kg

1.100 0.050 Jumlah Harga Bahan

97,500.00 6,930.00

107,250.00 346.50 107,596.50

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit

15%

0.00

123,884.50

123,884.50 18,582.68

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

A.4.6.2.17 Pemasangan 1 m 2 kaca tebal 5 mm A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kaca tebal 5 mm Sealent

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7 142,467.18

OH OH OH OH

0.015 0.150 0.015 0.0008 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

1,200.00 13,500.00 1,500.00 88.00 16,288.00

M2 Kg

1.100 0.050 Jumlah Harga Bahan

95,000.00 6,930.00

104,500.00 346.50 104,846.50

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.18 Pemasangan 1 m 2 kaca tebal 8 mm A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kaca tebal 8 mm Sealent

15%

OH OH OH OH

0.017 0.170 0.017 0.0009 Jumlah Tenaga Kerja

M2 Kg

1.100 0.070 Jumlah Harga Bahan

0.00

121,134.50

80,000.00 90,000.00 100,000.00 110,000.00

6,930.00

121,134.50 18,170.18 139,304.68

1,360.00 15,300.00 1,700.00 99.00 18,459.00 0.00 485.10 485.10

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.19 Pemasangan 1 m 2 kaca buram tebal 12 mm A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kaca buram 12 mm Sealent

15%

OH OH OH OH

0.025 0.250 0.025 0.0013 Jumlah Tenaga Kerja

M2 Kg

1.100 0.070 Jumlah Harga Bahan

0.00

18,944.10

80,000.00 90,000.00 100,000.00 110,000.00

6,930.00

18,944.10 2,841.62 21,785.72

2,000.00 22,500.00 2,500.00 143.00 27,143.00 0.00 485.10 485.10

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

27,628.10

27,628.10 4,144.22 31,772.32

NO

URAIAN

KODE

1 2 3 A.4.6.2.20 Pemasangan 1 m 2 kaca cermin tebal 5 mm A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kaca cermin 5 mm

SAT

KOEFISIEN

4

5

HARGA SATUAN (Rp.) 6

80,000.00 90,000.00 100,000.00 110,000.00

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.015 0.150 0.015 0.0080 Jumlah Tenaga Kerja

1,200.00 13,500.00 1,500.00 880.00 17,080.00

M2

1.100 Jumlah Harga Bahan

0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.21 Pemasangan 1 m 2 kaca cermin tebal 8 mm A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kaca cermin 8 mm

15%

17,080.00

80,000.00 90,000.00 100,000.00 110,000.00

17,080.00 2,562.00 19,642.00

OH OH OH OH

0.017 0.170 0.017 0.0090 Jumlah Tenaga Kerja

1,360.00 15,300.00 1,700.00 990.00 19,350.00

M2

1.100 Jumlah Harga Bahan

0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.22 Pemasangan 1 m 2 kaca wireglassed tebal 5 mm A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kaca wireglassed 5 mm

15%

OH OH OH OH

0.015 0.150 0.015 0.0080 Jumlah Tenaga Kerja

M2

1.100 Jumlah Harga Bahan

19,350.00

80,000.00 90,000.00 100,000.00 110,000.00

19,350.00 2,902.50 22,252.50

1,200.00 13,500.00 1,500.00 880.00 17,080.00 0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.6.2.23 Pemasangan 1 m 2 kaca patri tebal 5 mm A TENAGA Pekerja L.01 Tukang Kayu L.02 Kepala Tukang L.03 Mandor L.04

15%

OH OH OH OH

0.075 0.150 0.015 0.0040

17,080.00

80,000.00 90,000.00 100,000.00 110,000.00

0.00 17,080.00 2,562.00 19,642.00

6,000.00 13,500.00 1,500.00 440.00

NO

URAIAN

KODE

SAT

1

2

3

4

B BAHAN Kaca patri 5 mm Sealent

M2 Kg

HARGA SATUAN (Rp.) 5 6 Jumlah Tenaga Kerja KOEFISIEN

1.100 0.050 Jumlah Harga Bahan

6,930.00

JUMLAH HARGA (Rp.) 7 21,440.00 0.00 346.50 346.50

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN A.4.7.1.1 1 m 2 Pengikisan/pengerokan permukaan cat lama A TENAGA Pekerja L.01 Mandor L.04 B BAHAN Soda api

15%

0.00

21,786.50

80,000.00 110,000.00

21,786.50 3,267.98 25,054.48

OH OH

0.150 0.0030 Jumlah Tenaga Kerja

12,000.00 330.00 12,330.00

Kg

0.050 Jumlah Harga Bahan

0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.7.1.2 1 m 2 Pencucian bidang permukaan tembok yang pernah dicat A TENAGA Pekerja L.01 OH Mandor L.04 OH B BAHAN Sabun

Kg

12,330.00

12,330.00 1,849.50 14,179.50

0.150 0.0030 Jumlah Tenaga Kerja

80,000.00 110,000.00

12,000.00 330.00 12,330.00

0.050 Jumlah Harga Bahan

15,000.00

750.00 750.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.7.1.3 1 m 2 Pengerokan karat pada permukaan baja secara manual A TENAGA Pekerja L.01 OH Mandor L.04 OH B BAHAN Sabun

Kg

0.00

13,080.00

13,080.00 1,962.00 15,042.00

0.150 0.0080 Jumlah Tenaga Kerja

80,000.00 110,000.00

12,000.00 880.00 12,880.00

0.050 Jumlah Harga Bahan

15,000.00

750.00 750.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C)

0.00 13,630.00

NO 1

URAIAN 2 E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

HARGA SATUAN (Rp.) 6 13,630.00

A.4.7.1.4 1 m 2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) A TENAGA Pekerja L.01 OH 0.070 80,000.00 Tukang Cat L.02 OH 0.009 90,000.00 Kepala Tukang L.03 OH 0.006 100,000.00 Mandor L.04 OH 0.0030 110,000.00 Jumlah Tenaga Kerja B BAHAN Cat meny kg 0.200 30,600.00 Plamuur Kg 0.150 27,500.00 Cat dasar Kg 0.170 54,000.00 Cat penutup Kg 0.260 54,000.00 Kuas Bh 0.010 12,700.00 Pengencer Kg 0.030 27,600.00 Ampelas Lbr 0.200 4,100.00 Jumlah Harga Bahan

JUMLAH HARGA (Rp.) 7 2,044.50 15,674.50

5,600.00 810.00 600.00 330.00 7,340.00 6,120.00 4,125.00 9,180.00 14,040.00 127.00 828.00 820.00 35,240.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

42,580.00

A.4.7.1.5 1 m 2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) A TENAGA Pekerja L.01 OH 0.070 80,000.00 Tukang Cat L.02 OH 0.105 90,000.00 Kepala Tukang L.03 OH 0.004 100,000.00 Mandor L.04 OH 0.0030 110,000.00 Jumlah Tenaga Kerja B BAHAN Cat meny 0.200 30,600.00 M2 Plamuur Kg 0.150 27,500.00 Cat dasar Kg 0.170 54,000.00 Cat penutup Kg 0.350 54,000.00 Kuas Bh 0.010 12,700.00 Pengencer Kg 0.030 27,600.00 Ampelas Lbr 0.200 4,100.00 Jumlah Harga Bahan C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.4.7.1.6 Pelaburan 1 m 2 bidang kayu dengan teak oil A TENAGA Pekerja L.01 Tukang Cat L.02 Kepala Tukang L.03

15%

OH OH OH

0.040 0.063 0.063

42,580.00 6,387.00 48,967.00

5,600.00 9,450.00 400.00 330.00 15,780.00 6,120.00 4,125.00 9,180.00 18,900.00 127.00 828.00 820.00 40,100.00

0.00

55,880.00

55,880.00 8,382.00 64,262.00

80,000.00 90,000.00 100,000.00

3,200.00 5,670.00 6,300.00

NO

URAIAN

KODE

SAT

2

3 L.04

4 OH

1 Mandor B BAHAN Teak oil

L

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.0030 110,000.00 330.00 Jumlah Tenaga Kerja 15,500.00 KOEFISIEN

0.360 Jumlah Harga Bahan

0.00

0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.7.1.7 Pelaburan 1 m 2 bidang kayu dengan politur A TENAGA Pekerja L.01 Tukang Cat L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Politur Politur jadi Ampelas

15%

0.00

15,500.00

15,500.00 2,325.00 17,825.00

OH OH OH OH

0.040 0.060 0.160 0.0030 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

3,200.00 5,400.00 16,000.00 330.00 24,930.00

L L Lbr

0.150 0.372 2.000 Jumlah Harga Bahan

56,700.00 53,500.00 4,100.00

8,505.00 19,902.00 8,200.00 36,607.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.7.1.8 Pelaburan 1 m 2 bidang kayu dengan cat residu dan ter A TENAGA Pekerja L.01 OH Mandor L.04 OH B BAHAN Residu atau ter

L

0.00

61,537.00

61,537.00 9,230.55 70,767.55

0.100 0.0060 Jumlah Tenaga Kerja

80,000.00 110,000.00

8,000.00 660.00 8,660.00

0.350 Jumlah Harga Bahan

18,000.00

6,300.00 6,300.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.7.1.9 Pelaburan 1 m 2 bidang kayu dengan vernis A TENAGA Pekerja L.01 Tukang Cat L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Vernis Dempul

15%

OH OH OH OH

L Kg

0.00

14,960.00

0.160 0.160 0.016 0.0030 Jumlah Tenaga Kerja 0.150 0.050

14,960.00 2,244.00 17,204.00

80,000.00 90,000.00 100,000.00 110,000.00

12,800.00 14,400.00 1,600.00 330.00 29,130.00

42,000.00 30,100.00

6,300.00 1,505.00

NO 1

URAIAN

KODE

SAT

2

3

4 Lbr

Ampelas

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.100 4,100.00 410.00 Jumlah Harga Bahan 8,215.00 KOEFISIEN

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.7.1.10 Pengecatan 1 m 2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) A TENAGA Pekerja L.01 OH 0.020 Tukang Cat L.02 OH 0.063 Kepala Tukang L.03 OH 0.0063 Mandor L.04 OH 0.0030 Jumlah Tenaga Kerja B BAHAN Plamuur Kg 0.100 Cat dasar Kg 0.100 Cat penutup Kg 0.260 Jumlah Harga Bahan C PERALATAN

0.00

37,345.00

80,000.00 90,000.00 100,000.00 110,000.00

1,600.00 5,670.00 630.00 330.00 8,230.00

11,600.00 21,700.00 21,700.00

1,160.00 2,170.00 5,642.00 8,972.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.7.1.11 Pengecatan 1 m 2 tembok lama (1 lapis cat dasar, 2 A TENAGA Pekerja L.01 Tukang Cat L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Cat dasar Cat penutup

15%

37,345.00 5,601.75 42,946.75

0.00

17,202.00

17,202.00 2,580.30 19,782.30

lapis cat penutup) OH OH OH OH

0.028 0.042 0.0042 0.0030 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

2,240.00 3,780.00 420.00 330.00 6,770.00

Kg Kg

0.120 0.180 Jumlah Harga Bahan

21,700.00 21,700.00

2,604.00 3,906.00 6,510.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.7.1.12 Pelaburan 1 m 2 tembok dengan kalkarium A TENAGA Pekerja L.01 Tukang Cat L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Kalkarium

15%

0.00

13,280.00

13,280.00 1,992.00 15,272.00

OH OH OH OH

0.028 0.042 0.0042 0.0030 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

2,240.00 3,780.00 420.00 330.00 6,770.00

Kg

0.100 Jumlah Harga Bahan

0.00

0.00 0.00

NO 1

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.7.1.13 Pelaburan 1 m2 tembok dengan Kapur Pasang sirih A TENAGA Pekerja L.01 OH Tukang Cat L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Kapur Pasang sirih Ampelas Alang-alang

Kg Lbr Ikat

0.00

6,770.00

6,770.00 1,015.50 7,785.50

0.150 0.001 0.0001 0.0025 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

12,000.00 90.00 10.00 275.00 12,375.00

0.150 0.100 0.250 Jumlah Harga Bahan

0.00 4,100.00 0.00

0.00 410.00 0.00 410.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.7.1.14 Pelaburan 1 m2 tembok lama dengan Kapur Pasang sirih (pemeliharaan) A TENAGA Pekerja L.01 OH 0.040 Tukang Cat L.02 OH 0.005 Kepala Tukang L.03 OH 0.0005 Mandor L.04 OH 0.0025 Jumlah Tenaga Kerja B BAHAN Kapur Pasang sirih Kg 0.300 Ampelas Lbr 0.200 Alang-alang Ikat 0.250 Jumlah Harga Bahan C PERALATAN

0.00

12,785.00

80,000.00 90,000.00 100,000.00 110,000.00

3,200.00 450.00 50.00 275.00 3,975.00

0.00 4,100.00 0.00

0.00 820.00 0.00 820.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.7.1.15 Pemasangan 1 m 2 wallpaper A TENAGA Pekerja Tukang Cat Kepala Tukang Mandor B BAHAN Wallpaper Lem

15%

L.01 L.02 L.03 L.04

12,785.00 1,917.75 14,702.75

0.00

4,795.00

4,795.00 719.25 5,514.25

OH OH OH OH

0.020 0.200 0.020 0.0025 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

1,600.00 18,000.00 2,000.00 275.00 21,875.00

M2 Kg

1.200 0.200 Jumlah Harga Bahan

0.00 12,800.00

0.00 2,560.00 2,560.00

NO 1

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.7.1.16 Pengecatan 1 m 2 permukaan baja dengan meny besi A TENAGA Pekerja L.01 OH Tukang Cat L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Meny besi Kuas

Kg Bh

0.00

24,435.00

24,435.00 3,665.25 28,100.25

0.020 0.200 0.020 0.0025 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

1,600.00 18,000.00 2,000.00 275.00 21,875.00

0.100 0.010 Jumlah Harga Bahan

36,000.00 12,700.00

3,600.00 127.00 3,727.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

25,602.00

A.4.7.1.17 Pengecatan 1 m 2 permukaan baja dengan meny besi dengan perancah A TENAGA Pekerja L.01 OH 0.250 Tukang Cat L.02 OH 0.225 Kepala Tukang L.03 OH 0.023 Mandor L.04 OH 0.0075 Jumlah Tenaga Kerja B BAHAN Meny besi Kg 0.100 Pengencer L 0.010 Kuas Bh 0.010 Perancah kayu M3 0.002 Jumlah Harga Bahan C PERALATAN

80,000.00 90,000.00 100,000.00 110,000.00

20,000.00 20,250.00 2,250.00 825.00 43,325.00

36,000.00 27,600.00 12,700.00 860,100.00

3,600.00 276.00 127.00 1,720.20 5,723.20

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

B BAHAN Meny A

Kg

0.00

49,048.20

A.4.7.1.18 Pengecatan 1 m 2 permukaan baja galvanis secara manual 4 lapis A TENAGA Pekerja L.01 OH 0.250 Tukang Cat L.02 OH 0.250 Kepala Tukang L.03 OH 0.025 Mandor L.04 OH 0.0013 Jumlah Tenaga Kerja

0.100

25,602.00 3,840.30 29,442.30

49,048.20 7,357.23 56,405.43

80,000.00 90,000.00 100,000.00 110,000.00

20,000.00 22,500.00 2,500.00 143.00 45,143.00

27,600.00

2,760.00

NO 1

URAIAN

KODE

SAT

2

3

4 Kg Kg Bh L

Menie B Cat Kuas Pengencer

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.100 18,300.00 1,830.00 0.080 54,000.00 4,320.00 0.010 12,700.00 127.00 0.010 27,600.00 276.00 Jumlah Harga Bahan 9,313.00 KOEFISIEN

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.7.1.19 Pengecatan 1 m 2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir A TENAGA Pekerja L.01 OH 0.060 Tukang Cat L.02 OH 0.060 Kepala Tukang L.03 OH 0.012 Mandor L.04 OH 0.0030 Jumlah Tenaga Kerja B BAHAN Cat 3.25 Kg 0.300 Kuas Bh 0.010 Pengencer L 0.010 Jumlah Harga Bahan C PERALATAN

0.00

54,456.00

80,000.00 90,000.00 100,000.00 110,000.00

4,800.00 5,400.00 1,200.00 330.00 11,730.00

54,000.00 12,700.00 27,600.00

16,200.00 127.00 276.00 16,603.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.4.7.1.20 Pengecatan 1 m 2 permukaan baja galvanis secara manual sistem 3 lapis cat A TENAGA Pekerja L.01 OH 0.400 Tukang Cat L.02 OH 0.800 Kepala Tukang L.03 OH 0.080 Mandor L.04 OH 0.0200 Jumlah Tenaga Kerja B BAHAN Cat dasar Kg 0.110 Cat antara Kg 0.170 Cat penutup Kg 0.080 Kuas Bh 0.010 Pengencer L 0.010 Jumlah Harga Bahan C PERALATAN

0.00

28,333.00

15%

A.4.7.1.21 Pengecatan 1 m 2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir A TENAGA Pekerja L.01 OH 0.400

28,333.00 4,249.95 32,582.95

80,000.00 90,000.00 100,000.00 110,000.00

32,000.00 72,000.00 8,000.00 2,200.00 114,200.00

13,420.00 13,420.00 54,600.00 12,700.00 3,400.00

1,476.20 2,281.40 4,368.00 127.00 34.00 8,286.60

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

54,456.00 8,168.40 62,624.40

0.00

122,486.60

122,486.60 18,372.99 140,859.59

80,000.00

32,000.00

NO

URAIAN

KODE

SAT

2

3 L.02 L.03 L.04

4 OH OH OH

1 Tukang Cat Kepala Tukang Mandor B BAHAN Cat dasar Pengencer

Kg L

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.700 90,000.00 63,000.00 0.070 100,000.00 7,000.00 0.0200 110,000.00 2,200.00 Jumlah Tenaga Kerja 104,200.00 KOEFISIEN

0.300 0.010 Jumlah Harga Bahan

13,420.00 3,400.00

4,026.00 34.00 4,060.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.7.1.22 Plituran 10 m 2 dengan plitur melamic A TENAGA Pekerja L.01 Tukang Cat L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Wood filler Woodstain Sanding Melamic Thinner Ampelas

15%

OH OH OH OH

2.000 12.000 1.200 0.1000 Jumlah Tenaga Kerja

kg kg kg kg Kg L

1.5 1.5 1.5 2.4 2.000 6.000 Jumlah Harga Bahan

0.00

108,260.00

108,260.00 16,239.00 124,499.00

80,000.00 90,000.00 100,000.00 110,000.00

160,000.00 1,080,000.00 120,000.00 11,000.00 1,371,000.00

27,600.00 4,100.00

55,200.00 24,600.00 79,800.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG A.5.1.1.1 (K3) Pemasangan 1 buah closet duduk/ monoblock A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Closet duduk Perlengkapan

Unit Ls

0.00

1,450,800.00

1,450,800.00 217,620.00 1,668,420.00

3.300 1.100 0.010 0.1600 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

264,000.00 99,000.00 1,000.00 17,600.00 381,600.00

1.000 6% x closet Jumlah Harga Bahan

1,505,800.00

1,505,800.00 90,348.00 1,596,148.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

1,977,748.00

1,977,748.00 296,662.20 2,274,410.20

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.5.1.1.2 Pemasangan 1 buah closet jongkok porselen A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Closet jongkok Semen abu-abu/PC Pasir Pasang Bata merah

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

1.000 1.500 0.150 0.1600 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

80,000.00 135,000.00 15,000.00 17,600.00 247,600.00

Unit Kg M3 Bh

1.000 6.00 0.010 7.000 Jumlah Harga Bahan

160,000.00 1,145.00 265,000.00 650.00

160,000.00 6,870.00 2,650.00 4,550.00 174,070.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.5.1.1.3 Pemasangan 1 buah closet jongkok teraso A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Closet jongkok Semen abu-abu/PC Pasir Pasang Bata merah

0.00

421,670.00

421,670.00 63,250.50 484,920.50

OH OH OH OH

1.000 1.500 0.150 0.0500 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

80,000.00 135,000.00 15,000.00 5,500.00 235,500.00

Unit Kg M3 Bh

1.000 6.00 0.010 7.000 Jumlah Harga Bahan

0.00 1,145.00 265,000.00 650.00

0.00 6,870.00 2,650.00 4,550.00 14,070.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.4 (K3) Pemasangan 1 buah urinoir A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor B BAHAN Urinoir Semen abu-abu/PC Pasir Pasang Perlengkapan

15%

L.01 L.02 L.03 L.04

249,570.00

0.00 249,570.00 37,435.50 287,005.50

OH OH OH OH

1.000 1.000 0.100 0.0500 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

80,000.00 90,000.00 10,000.00 5,500.00 185,500.00

Unit Kg M3 %

1.000 6.00 0.010 30.00 Jumlah Harga Bahan

0.00 1,145.00 265,000.00

0.00 6,870.00 2,650.00 0.00 9,520.00

C PERALATAN Jumlah Harga Alat

0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.5 (K3) Pemasangan 1 buah wastafel A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

HARGA SATUAN (Rp.) 6

15%

L.01 L.02 L.03 L.04

B BAHAN Wastafel Semen abu-abu/PC Pasir Pasang Perlengkapan

195,020.00

JUMLAH HARGA (Rp.) 7 195,020.00 29,253.00 224,273.00

OH OH OH OH

1.200 1.450 0.150 0.0600 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

96,000.00 130,500.00 15,000.00 6,600.00 248,100.00

Unit Kg M3 %

1.200 6.00 0.010 12.00 Jumlah Harga Bahan

257,800.00 1,145.00 265,000.00

309,360.00 6,870.00 2,650.00 30,936.00 349,816.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.6 (K3) Pemasangan 1 buah bathcuip porselen A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Bathcuip Perlengkapan

15%

0.00

597,916.00

597,916.00 89,687.40 687,603.40

OH OH OH OH

0.075 0.75 0.075 0.003 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,000.00 67,500.00 7,500.00 330.00 81,330.00

Unit %

1.000 20 Jumlah Harga Bahan

0.00

0.00 0.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.7 (K3) Pemasangan 1 buah bak fibreglass vol 1 m3 A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Bak fibreglass Perlengkapan

15%

0.00

81,330.00

81,330.00 12,199.50 93,529.50

OH OH OH OH

3.00 4.50 0.05 0.90 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

240,000.00 405,000.00 5,000.00 99,000.00 749,000.00

Unit Ls

1.000 12%xbak Jumlah Harga Bahan

306,900.00

306,900.00 36,828.00 343,728.00

C PERALATAN Jumlah Harga Alat

0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.5.1.1.8 (K3) Pemasangan 1 buah bak mandi batu bata vol 0.30 m3 A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Bata merah Semen abu-abu/PC Pasir Pasang Porselen 11 x 11 Semen warna

HARGA SATUAN (Rp.) 6

M3 Kg M3 Bh Kg

1,092,728.00

JUMLAH HARGA (Rp.) 7 1,092,728.00 163,909.20 1,256,637.20

6.00 3.00 0.30 0.03 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

480,000.00 270,000.00 30,000.00 3,300.00 783,300.00

150.00 120 0.300 360.00 6.00 Jumlah Harga Bahan

650.00 1,145.00 265,000.00 54,500.00 8,000.00

97,500.00 137,400.00 79,500.00 196,200.00 480.00 511,080.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.5.1.1.9 Pemasangan 1 buah bak mandi teraso vol 0.30 m3 A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Bak fibreglass Perlengkapan

Unit Ls

0.00

1,294,380.00

1,294,380.00 194,157.00 1,488,537.00

3.00 4.50 0.05 0.90 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

240,000.00 405,000.00 5,000.00 99,000.00 749,000.00

1.000 12%xbak Jumlah Harga Bahan

265,000.00

265,000.00 31,800.00 296,800.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.10 Pemasangan 1 buah bak fibreglass vol 1 m3 A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Bak fibreglass Perlengkapan C PERALATAN

15%

0.00

1,045,800.00

1,045,800.00 156,870.00 1,202,670.00

OH OH OH OH

0.30 0.45 0.045 0.015 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

24,000.00 40,500.00 4,500.00 1,650.00 70,650.00

Unit Ls

1.000 12%xbak Jumlah Harga Bahan

306,900.00

306,900.00 36,828.00 343,728.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.11 (K3) Pemasangan 1 buah bak beton volume 1 m3 A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04

B BAHAN Beton 1:2:3 Baja tulangan Kayu bekisting Ubin porselen Perlengkapan

15%

JUMLAH HARGA (Rp.) 7 0.00

414,378.00

414,378.00 62,156.70 476,534.70

OH OH OH OH

3.50 4.50 0.05 0.018 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

280,000.00 405,000.00 5,000.00 1,980.00 691,980.00

M3 Kg M2 Bh %

0.900 180.00 8.00 500.00 10.00 Jumlah Harga Bahan

947,851.36 9,200.00 860,100.00 102.00

853,066.21 1,656,000.00 6,880,800.00 51,000.00 9,440,866.21

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.12 Pemasangan 1 buah bak cuci piring stainlessteel A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Bak cuci piring Waterdrain

15%

0.00

10,132,846.21

10,132,846.21 1,519,926.93 11,652,773.14

OH OH OH OH

0.03 0.30 0.03 0.015 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

2,400.00 27,000.00 3,000.00 1,650.00 34,050.00

Unit Bh

1.000 1.000 Jumlah Harga Bahan

173,300.00 13,800.00

173,300.00 13,800.00 187,100.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.13 Pemasangan 1 buah bak cuci piring teraso A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Bak cuci piring Waterdrain

15%

OH OH OH OH

Unit Bh

0.00

221,150.00

0.05 0.50 0.05 0.025 Jumlah Tenaga Kerja 1.000 1.000

221,150.00 33,172.50 254,322.50

80,000.00 90,000.00 100,000.00 110,000.00

4,000.00 45,000.00 5,000.00 2,750.00 56,750.00

0.00 13,800.00

0.00 13,800.00

NO 1

URAIAN 2 Semen abu-abu/PC Pasir Pasang

KODE

SAT

3

4 Kg M3

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 20.000 1,145.00 22,900.00 0.050 265,000.00 13,250.00 Jumlah Harga Bahan 49,950.00 KOEFISIEN

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.14 Pemasangan 1 buah floor drain A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor B BAHAN Floor drain

15%

L.01 L.02 L.03 L.04

0.00

106,700.00

106,700.00 16,005.00 122,705.00

OH OH OH OH

0.01 0.10 0.01 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

800.00 9,000.00 1,000.00 550.00 11,350.00

Unit

1.000 Jumlah Harga Bahan

124,000.00

124,000.00 124,000.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.5.1.1.15 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm A TENAGA Pekerja L.01 OH 2.16 Tukang Batu L.02 OH 0.72 Kepala Tukang L.03 OH 0.07 Mandor L.04 OH 0.011 Jumlah Tenaga Kerja B BAHAN Bata merah buah 40.000 Semen abu-abu/PC Kg 44.000 Pasir Pasang M3 0.07 Pasir Pasang M3 0.06 Kerikil M3 0.07 Baja tulangan Kg 1.60 Jumlah Harga Bahan C PERALATAN

135,350.00

80,000.00 90,000.00 100,000.00 110,000.00

172,800.00 64,800.00 7,200.00 1,210.00 246,010.00

650.00 1,145.00 265,000.00 265,000.00 306,000.00 9,200.00

26,000.00 50,380.00 18,550.00 15,900.00 21,420.00 14,720.00 146,970.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.5.1.1.16 Pemasangan 1 buah bak kontrol pasangan bata 45 cm x 45 cm tinggi 50 cm A TENAGA Pekerja L.01 OH 3.20 Tukang Batu L.02 OH 1.15 Kepala Tukang L.03 OH 0.011 Mandor L.04 OH 0.016 Jumlah Tenaga Kerja

0.00 135,350.00 20,302.50 155,652.50

0.00

392,980.00

80,000.00 90,000.00 100,000.00 110,000.00

392,980.00 58,947.00 451,927.00

256,000.00 103,500.00 1,100.00 1,760.00 362,360.00

NO 1

URAIAN 2 B BAHAN Bata merah Semen abu-abu/PC Pasir Pasang Pasir beton Kerikil Baja tulangan

KODE

SAT

KOEFISIEN

3

4

5

buah Kg M3 M3 M3 Kg

HARGA SATUAN (Rp.) 6

70.000 77.000 0.13 0.09 0.02 2.60 Jumlah Harga Bahan

650.00 1,145.00 265,000.00 265,000.00 306,000.00 9,200.00

JUMLAH HARGA (Rp.) 7 45,500.00 88,165.00 34,450.00 23,850.00 6,120.00 23,920.00 222,005.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.5.1.1.17 Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm A TENAGA Pekerja L.01 OH 3.20 Tukang Batu L.02 OH 1.15 Kepala Tukang L.03 OH 0.011 Mandor L.04 OH 0.016 Jumlah Tenaga Kerja B BAHAN Bata merah Unit 123.000 Semen abu-abu/PC Kg 114.000 Pasir Pasang M3 0.184 Pasir Pasang M3 0.120 Kerikil M3 0.033 Baja tulangan Kg 4.850 Jumlah Harga Bahan C PERALATAN

0.00

584,365.00

80,000.00 90,000.00 100,000.00 110,000.00

256,000.00 103,500.00 1,100.00 1,760.00 362,360.00

650.00 1,145.00 265,000.00 265,000.00 306,000.00 9,200.00

79,950.00 130,530.00 48,760.00 31,800.00 10,098.00 44,620.00 345,758.00

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.18 Pemasangan 1 m' pipa galvanis diameter 1/2" A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Pipa galvanis 1/2" Perlengkapan

15%

584,365.00 87,654.75 672,019.75

0.00

708,118.00

708,118.00 106,217.70 814,335.70

OH OH OH OH

0.054 0.09 0.009 0.027 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

4,320.00 8,100.00 900.00 2,970.00 16,290.00

M Ls

1.200 35% x pipa Jumlah Harga Bahan

12,000.00

14,400.00 4,200.00 18,600.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.19 Pemasangan 1 buah kran diameter 1/2" atau 3/4"

15%

0.00

34,890.00

34,890.00 5,233.50 40,123.50

NO

HARGA SATUAN (Rp.) 6

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

L.01 L.02 L.03 L.04

OH OH OH OH

0.01 0.40 0.040 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

800.00 36,000.00 4,000.00 550.00 41,350.00

Bh Bh

1.000 0.025 Jumlah Harga Bahan

27,400.00 3,000.00

27,400.00 75.00 27,475.00

1 A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor B BAHAN Kran air Sealtape

JUMLAH HARGA (Rp.) 7

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.20 Pemasangan 1 m' pipa galvanis diameter 3/4" A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Pipa galvanis 3/4" Perlengkapan

15%

0.00

68,825.00

68,825.00 10,323.75 79,148.75

OH OH OH OH

0.054 0.09 0.009 0.027 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

4,320.00 8,100.00 900.00 2,970.00 16,290.00

M %

1.200 35.000 Jumlah Harga Bahan

16,100.00

19,320.00 5,635.00 24,955.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.21 Pemasangan 1 m' pipa galvanis diameter 1" A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04

B BAHAN Pipa galvanis 1" Perlengkapan

15%

0.00

41,245.00

41,245.00 6,186.75 47,431.75

OH OH OH OH

0.054 0.09 0.009 0.027 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

4,320.00 8,100.00 900.00 2,970.00 16,290.00

M %

1.200 35.000 Jumlah Harga Bahan

15,000.00

18,000.00 5,250.00 23,250.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.22 Pemasangan 1 m' pipa galvanis diameter 1 1/2"

15%

0.00

39,540.00

39,540.00 5,931.00 45,471.00

NO

HARGA SATUAN (Rp.) 6

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

L.01 L.02 L.03 L.04

OH OH OH OH

0.108 0.18 0.018 0.005 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

8,640.00 16,200.00 1,800.00 550.00 27,190.00

M %

1.200 35.000 Jumlah Harga Bahan

12,000.00

14,400.00 4,200.00 18,600.00

1 A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

B BAHAN Pipa galvanis 1 1/2" Perlengkapan

JUMLAH HARGA (Rp.) 7

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.23 Pemasangan 1 m' pipa galvanis diameter 3" A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Pipa galvanis 3" Perlengkapan

15%

0.00

45,790.00

80,000.00 90,000.00 100,000.00 110,000.00

45,790.00 6,868.50 52,658.50

OH OH OH OH

0.135 0.225 0.023 0.007 Jumlah Tenaga Kerja

10,800.00 20,250.00 2,300.00 770.00 34,120.00

M %

1.200 35.000 Jumlah Harga Bahan

0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.24 Pemasangan 1 m' pipa galvanis diameter 4" A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Pipa galvanis 4" Perlengkapan

15%

34,120.00

80,000.00 90,000.00 100,000.00 110,000.00

34,120.00 5,118.00 39,238.00

OH OH OH OH

0.135 0.225 0.023 0.007 Jumlah Tenaga Kerja

10,800.00 20,250.00 2,300.00 770.00 34,120.00

M %

1.200 35.000 Jumlah Harga Bahan

0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.25 Pemasangan 1 m' pipa PVC tipe AW diameter 1/2" A TENAGA Pekerja L.01

15%

OH

0.036

34,120.00

34,120.00 5,118.00 39,238.00

80,000.00

2,880.00

NO

URAIAN

KODE

SAT

2

3 L.02 L.03 L.04

4 OH OH OH

1 Tukang Batu Kepala Tukang Mandor

B BAHAN Pipa PVC AW 1/2" Perlengkapan

M %

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.060 90,000.00 5,400.00 0.006 100,000.00 600.00 0.002 110,000.00 220.00 Jumlah Tenaga Kerja 9,100.00 KOEFISIEN

1.200 35.000 Jumlah Harga Bahan

6,900.00

8,280.00 2,415.00 10,695.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.26 Pemasangan 1 m' pipa PVC tipe AW A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

15%

0.00

19,795.00

19,795.00 2,969.25 22,764.25

diameter 3/4" L.01 L.02 L.03 L.04

B BAHAN Pipa PVC AW 3/4" Perlengkapan

OH OH OH OH

0.036 0.060 0.006 0.002 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

2,880.00 5,400.00 600.00 220.00 9,100.00

M %

1.200 35.000 Jumlah Harga Bahan

6,800.00

8,160.00 2,380.00 10,540.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.27 Pemasangan 1 m' pipa PVC tipe AW A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

15%

0.00

19,640.00

19,640.00 2,946.00 22,586.00

diameter 1" L.01 L.02 L.03 L.04

B BAHAN Pipa PVC AW 1" Perlengkapan

OH OH OH OH

0.036 0.060 0.006 0.002 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

2,880.00 5,400.00 600.00 220.00 9,100.00

M %

1.200 35.000 Jumlah Harga Bahan

8,300.00

9,960.00 2,905.00 12,865.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.28 Pemasangan 1 m' pipa PVC tipe AW A TENAGA Pekerja Tukang Batu Kepala Tukang

15%

0.00

21,965.00

21,965.00 3,294.75 25,259.75

80,000.00 90,000.00 100,000.00

4,320.00 8,100.00 900.00

diameter 1 1/2" L.01 L.02 L.03

OH OH OH

0.054 0.090 0.009

NO

URAIAN

KODE

SAT

2

3 L.04

4 OH

1 Mandor

B BAHAN Pipa PVC AW 1 1/2" Perlengkapan

M %

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.003 110,000.00 330.00 Jumlah Tenaga Kerja 13,650.00 KOEFISIEN

1.200 35.000 Jumlah Harga Bahan

0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.29 Pemasangan 1 m' pipa PVC tipe AW A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

15%

13,650.00

13,650.00 2,047.50 15,697.50

diameter 2" L.01 L.02 L.03 L.04

B BAHAN Pipa PVC AW 2" Perlengkapan

OH OH OH OH

0.054 0.090 0.009 0.003 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

4,320.00 8,100.00 900.00 330.00 13,650.00

M %

1.200 35.000 Jumlah Harga Bahan

20,200.00

24,240.00 7,070.00 31,310.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.30 Pemasangan 1 m' pipa PVC tipe AW A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

15%

0.00

44,960.00

44,960.00 6,744.00 51,704.00

diameter 2 1/2" L.01 L.02 L.03 L.04

B BAHAN Pipa PVC AW 2 1/2" Perlengkapan

OH OH OH OH

0.081 0.135 0.0135 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,480.00 12,150.00 1,350.00 440.00 20,420.00

M %

1.200 35.000 Jumlah Harga Bahan

0.00 0.00

Jumlah Harga Alat

0.00

C PERALATAN

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.31 Pemasangan 1 m' pipa PVC tipe AW A TENAGA Pekerja Tukang Batu Kepala Tukang

15%

20,420.00

20,420.00 3,063.00 23,483.00

80,000.00 90,000.00 100,000.00

6,480.00 12,150.00 1,350.00

diameter 3" L.01 L.02 L.03

OH OH OH

0.081 0.135 0.0135

NO

URAIAN

KODE

SAT

2

3 L.04

4 OH

1 Mandor B BAHAN Pipa PVC AW 3" Perlengkapan

M %

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.004 110,000.00 440.00 Jumlah Tenaga Kerja 20,420.00 KOEFISIEN

1.200 35.000 Jumlah Harga Bahan

32,300.00

38,760.00 11,305.00 50,065.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.32 Pemasangan 1 m' pipa PVC tipe AW A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor B BAHAN Pipa PVC AW 4" Perlengkapan

15%

0.00

70,485.00

70,485.00 10,572.75 81,057.75

diameter 4" L.01 L.02 L.03 L.04

OH OH OH OH

0.081 0.135 0.0135 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

6,480.00 12,150.00 1,350.00 440.00 20,420.00

M %

1.200 35.000 Jumlah Harga Bahan

49,200.00

59,040.00 17,220.00 76,260.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.5.1.1.33 Pemasangan 1 m' pipa air limbah jenis pipa tanah Ø 20 cm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH B BAHAN Pipa tanah Semen abu-abu/PC Pasir Pasang Pasir urug

M Kg M3 M3

0.080 0.040 0.0040 0.004 Jumlah Tenaga Kerja 1.600 35.000 0.014 0.014 Jumlah Harga Bahan

0.00

96,680.00

80,000.00 90,000.00 100,000.00 110,000.00

1,145.00 265,000.00 166,000.00

96,680.00 14,502.00 111,182.00

6,400.00 3,600.00 400.00 440.00 10,840.00 0.00 40,075.00 3,710.00 2,324.00 46,109.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.34 Pemasangan 1 m' pipa air limbah jenis pipa tanah Ø 15 cm A TENAGA Pekerja L.01 OH Tukang Batu L.02 OH Kepala Tukang L.03 OH

15%

0.060 0.030 0.0030

0.00

56,949.00

56,949.00 8,542.35 65,491.35

80,000.00 90,000.00 100,000.00

4,800.00 2,700.00 300.00

NO 1

URAIAN

KODE

SAT

2

3 L.04

4 OH

Mandor B BAHAN Pipa tanah dia 15 Semen abu-abu/PC Pasir Pasang Pasir urug

M Kg M3 M3

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.003 110,000.00 330.00 Jumlah Tenaga Kerja 8,130.00 KOEFISIEN

1.600 0.680 0.013 0.011 Jumlah Harga Bahan

1,145.00 265,000.00 166,000.00

0.00 778.60 3,445.00 1,826.00 6,049.60

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

0.00

14,179.60

14,179.60 2,126.94 16,306.54

NO

URAIAN

KODE

1 2 3 A.5.1.1.35 Pemasangan 1 m' pipa beton Ø 15 - 20 cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Pipa beton dia 15 Bata merah Semen abu-abu/PC Pasir Pasang Pasir urug

SAT

KOEFISIEN

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH OH

0.140 0.070 0.0070 0.007 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

11,200.00 6,300.00 700.00 770.00 18,970.00

M M3 Kg M3 M3

1.100 0.027 3.920 0.056 0.024 Jumlah Harga Bahan

36,200.00 650.00 1,145.00 265,000.00 166,000.00

39,820.00 17.55 4,488.40 14,840.00 3,984.00 63,149.95

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.5.1.1.36 Pemasangan 1 m' pipa beton Ø 30 - 100 cm A TENAGA Pekerja L.01 Tukang Batu L.02 Kepala Tukang L.03 Mandor L.04 B BAHAN Pipa beton dia 30 Bata merah Semen abu-abu/PC Pasir Pasang Pasir urug

15%

0.00

82,119.95

82,119.95 12,317.99 94,437.94

OH OH OH OH

0.380 0.190 0.0190 0.019 Jumlah Tenaga Kerja

80,000.00 90,000.00 100,000.00 110,000.00

30,400.00 17,100.00 1,900.00 2,090.00 51,490.00

M M3 Kg M3 M3

1.100 0.550 10.300 0.061 0.069 Jumlah Harga Bahan

63,200.00 650.00 1,145.00 265,000.00 166,000.00

69,520.00 357.50 11,793.50 16,165.00 11,454.00 109,290.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG A.8.4.1.1 Pemasangan 1 m pipa PVC Ø 63 mm A TENAGA Pekerja L.01 OH 0.081 Tukang pipa L.02 OH 0.041 Mandor L.04 OH 0.008 Jumlah Tenaga Kerja B BAHAN pipa PVC Ø 63 mm M 1.000 Jumlah Harga Bahan C PERALATAN Sewa tripot/tackel & handle Crane 2 T Hari 0.006 Jumlah Harga Alat D Jumlah (A+B+C)

0.00

160,780.00

80,000.00 90,000.00 110,000.00

160,780.00 24,117.00 184,897.00

6,480.00 3,690.00 880.00 11,050.00 0.00 0.00 0.00 0.00 11,050.00

NO 1

URAIAN 2 E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

HARGA SATUAN (Rp.) 6 11,050.00

JUMLAH HARGA (Rp.) 7 1,657.50 12,707.50

NO

URAIAN

1 2 A.8.4.1.2 Pemasangan 1 m pipa PVC Ø 90 mm A TENAGA Pekerja Tukang pipa Mandor

HARGA SATUAN (Rp.) 6

KODE

SAT

KOEFISIEN

3

4

5

L.01 L.02 L.04

OH OH OH

0.094 0.047 0.009 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

7,520.00 4,230.00 990.00 12,740.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 29,861.60

0.008 Jumlah Harga Alat

#N/A

#N/A #N/A

B BAHAN pipa PVC Ø 90 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.3 Pemasangan 1 m pipa PVC Ø 110 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN pipa PVC Ø 110 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

15%

B BAHAN pipa PVC Ø 150 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

#N/A #N/A #N/A

#N/A

0.105 0.053 0.011 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

8,400.00 4,770.00 1,210.00 14,380.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 300.00

0.010 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.118 0.059 0.012 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

9,440.00 5,310.00 1,320.00 16,070.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.012 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.5 Pemasangan 1 m pipa PVC Ø 200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

7

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.4 Pemasangan 1 m pipa PVC Ø 150 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.)

15%

OH OH OH

#N/A

0.189 0.095 0.019

80,000.00 90,000.00 110,000.00

#N/A #N/A #N/A

15,120.00 8,550.00 2,090.00

NO

URAIAN

KODE

SAT

1

2

3

4

B BAHAN pipa PVC Ø 200 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

M

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.6 Pemasangan 1 m pipa PVC Ø 250 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN pipa PVC Ø 250 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

B BAHAN pipa PVC Ø 300 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

B BAHAN pipa PVC Ø 400 mm

7 25,760.00

#N/A

#N/A 14,479.78

0.024 Jumlah Harga Alat

#N/A

#N/A #N/A #N/A #N/A #N/A

#N/A

OH OH OH

0.256 0.128 0.026 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

20,480.00 11,520.00 2,860.00 34,860.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.034 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.294 0.147 0.029 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

23,520.00 13,230.00 3,190.00 39,940.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 75.00

0.040 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.8 Pemasangan 1 m pipa PVC Ø 400 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.)

1.000 Jumlah Harga Bahan

15%

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.7 Pemasangan 1 m pipa PVC Ø 300 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 5 6 Jumlah Tenaga Kerja KOEFISIEN

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.544 0.272 0.054 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

43,520.00 24,480.00 5,940.00 73,940.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 110.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2 C PERALATAN Sewa tripot/tackel & handle Crane 2 T

3

4

5

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.9 Pemasangan 1 m pipa PVC Ø 450 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN pipa PVC Ø 450 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

B BAHAN pipa PVC Ø 500 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa PVC Ø 600 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

#N/A

JUMLAH HARGA (Rp.) 7 #N/A #N/A #N/A #N/A #N/A

#N/A

OH OH OH

0.669 0.335 0.067 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

53,520.00 30,150.00 7,370.00 91,040.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.100 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.809 0.405 0.081 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

64,720.00 36,450.00 8,910.00 110,080.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A #VALUE!

0.122 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.11 Pemasangan 1 m pipa PVC Ø 600 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

0.080 Jumlah Harga Alat

15%

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.10 Pemasangan 1 m pipa PVC Ø 500 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 6

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.957 0.479 0.096 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

76,560.00 43,110.00 10,560.00 130,230.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 6,410.00

0.145 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A

#N/A #N/A #N/A

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.8.4.1.12 Pemasangan 1 m pipa PVC Ø 800 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa PVC Ø 800 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa PVC Ø 900 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa PVC Ø 1000 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

80,000.00 90,000.00 110,000.00

129,440.00 72,810.00 17,820.00 220,070.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 10,370.00

0.250 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

1.691 0.846 0.169 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

135,280.00 76,140.00 18,590.00 230,010.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 8,390.00

0.262 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

1.895 0.948 0.190 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

151,600.00 85,320.00 20,900.00 257,820.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.294 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.15 Pemasangan 1 m pipa PVC Ø 1100 mm A TENAGA Pekerja L.01 Tukang pipa L.02

7

1.618 0.809 0.162 Jumlah Tenaga Kerja

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.14 Pemasangan 1 m pipa PVC Ø 1000 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.)

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.13 Pemasangan 1 m pipa PVC Ø 900 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 6

15%

OH OH

#N/A

2.099 1.050

80,000.00 90,000.00

#N/A #N/A #N/A

167,920.00 94,500.00

NO 1

URAIAN

KODE

SAT

2

3 L.04

4 OH

Mandor B BAHAN Pipa PVC Ø 1100 mm

M

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.16 Pemasangan 1 m pipa PVC Ø 1200 A TENAGA Pekerja Tukang pipa Mandor

#N/A

#N/A 0.00

0.327 Jumlah Harga Alat

#N/A

#N/A #N/A #N/A #N/A #N/A

#N/A

mm L.01 L.02 L.04

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

OH OH OH

2.303 1.152 0.230 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

184,240.00 103,680.00 25,300.00 313,220.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.359 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.8.4.1.17 Pemasangan 1 m pipa HDPE Ø 63 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa HDPE Ø 63 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

#N/A #N/A #N/A

#N/A

OH OH OH

0.035 0.017 0.003 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

2,800.00 1,530.00 330.00 4,660.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 37,520.00

0.019 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

B BAHAN Pipa HDPE Ø 100 mm

1.000 Jumlah Harga Bahan

15%

B BAHAN Pipa PVC Ø 1200 mm

A.8.4.1.18 Pemasangan 1 m pipa HDPE Ø 100 A TENAGA Pekerja Tukang pipa Mandor

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.210 110,000.00 23,100.00 Jumlah Tenaga Kerja 285,520.00 KOEFISIEN

15%

#N/A #N/A #N/A

#N/A

mm L.01 L.02 L.04

OH OH OH

0.040 0.020 0.004 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

3,200.00 1,800.00 440.00 5,440.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 10,980.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2 C PERALATAN Sewa tripot/tackel & handle Crane 2 T

3

4

5

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.19 Pemasangan 1 m pipa HDPE Ø 125 A TENAGA Pekerja Tukang pipa Mandor

L.01 L.02 L.04

#N/A #N/A #N/A

#N/A

80,000.00 90,000.00 110,000.00

3,600.00 2,070.00 550.00 6,220.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A #REF!

0.019 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

#N/A #N/A #N/A

#N/A

mm L.01 L.02 L.04

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

OH OH OH

0.062 0.031 0.006 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

4,960.00 2,790.00 660.00 8,410.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.019 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

D Jumlah (A+B+C) E Overhead & Profit

#N/A #N/A

0.045 0.023 0.005 Jumlah Tenaga Kerja

Hari

B BAHAN Pipa HDPE Ø 150 mm

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

7

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

B BAHAN Pipa HDPE Ø 200 mm

#N/A

JUMLAH HARGA (Rp.)

mm

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

A.8.4.1.21 Pemasangan 1 m pipa HDPE Ø 200 A TENAGA Pekerja Tukang pipa Mandor

0.019 Jumlah Harga Alat

15%

B BAHAN Pipa HDPE Ø 125 mm

A.8.4.1.20 Pemasangan 1 m pipa HDPE Ø 150 A TENAGA Pekerja Tukang pipa Mandor

HARGA SATUAN (Rp.) 6

15%

#N/A #N/A #N/A

#N/A

mm L.01 L.02 L.04

OH OH OH

0.102 0.051 0.010 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

8,160.00 4,590.00 1,100.00 13,850.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.019 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A

#N/A #N/A

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.22 Pemasangan 1 m pipa HDPE Ø 250 A TENAGA Pekerja Tukang pipa Mandor

KODE

SAT

KOEFISIEN

3

4

5

7

mm L.01 L.02 L.04

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

OH OH OH

0.133 0.067 0.013 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

10,640.00 6,030.00 1,430.00 18,100.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.042 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

#N/A #N/A #N/A

#N/A

mm L.01 L.02 L.04

B BAHAN Pipa HDPE Ø 300 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

OH OH OH

0.170 0.085 0.017 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

13,600.00 7,650.00 1,870.00 23,120.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.065 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.24 Pemasangan 1 m pipa HDPE Ø 4 00 A TENAGA Pekerja Tukang pipa Mandor

JUMLAH HARGA (Rp.) #N/A

B BAHAN Pipa HDPE Ø 250 mm

A.8.4.1.23 Pemasangan 1 m pipa HDPE Ø 300 A TENAGA Pekerja Tukang pipa Mandor

HARGA SATUAN (Rp.) 6

15%

#N/A #N/A #N/A

#N/A

mm L.01 L.02 L.04

B BAHAN Pipa HDPE Ø 400 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

OH OH OH

0.290 0.145 0.029 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

23,200.00 13,050.00 3,190.00 39,440.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.152 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.25 Pemasangan 1 m pipa HDPE Ø 450 mm A TENAGA Pekerja L.01

15%

OH

#N/A

0.359

80,000.00

#N/A #N/A #N/A

28,720.00

NO 1

URAIAN

KODE

SAT

2

3 L.02 L.04

4 OH OH

Tukang pipa Mandor B BAHAN Pipa HDPE Ø 450 mm

M

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.26 Pemasangan 1 m pipa HDPE Ø 500 A TENAGA Pekerja Tukang pipa Mandor

L.01 L.02 L.04

#N/A 0.00

0.200 Jumlah Harga Alat

#N/A

#N/A #N/A #N/A #N/A #N/A

#N/A

OH OH OH

0.433 0.216 0.043 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

34,640.00 19,440.00 4,730.00 58,810.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.251 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

#N/A #N/A #N/A

#N/A

mm L.01 L.02 L.04

B BAHAN Pipa HDPE Ø 600 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

OH OH OH

0.512 0.256 0.051 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

40,960.00 23,040.00 5,610.00 69,610.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 4,329.60

0.307 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

B BAHAN Pipa HDPE Ø 800 mm

#N/A

mm

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

A.8.4.1.28 Pemasangan 1 m pipa HDPE Ø 800 A TENAGA Pekerja Tukang pipa Mandor

1.000 Jumlah Harga Bahan

15%

B BAHAN Pipa HDPE Ø 500 mm

A.8.4.1.27 Pemasangan 1 m pipa HDPE Ø 600 A TENAGA Pekerja Tukang pipa Mandor

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.180 90,000.00 16,200.00 0.036 110,000.00 3,960.00 Jumlah Tenaga Kerja 48,880.00 KOEFISIEN

15%

#N/A #N/A #N/A

#N/A

mm L.01 L.02 L.04

OH OH OH

M

0.893 0.446 0.089 Jumlah Tenaga Kerja 1.000

80,000.00 90,000.00 110,000.00

71,440.00 40,140.00 9,790.00 121,370.00

#N/A

#N/A

NO

URAIAN

KODE

SAT

1

2

3

4

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.29 Pemasangan 1 m pipa HDPE Ø 900 A TENAGA Pekerja Tukang pipa Mandor

L.01 L.02 L.04

7 0.00 #N/A #N/A #N/A #N/A #N/A

#N/A

OH OH OH

1.353 0.677 0.135 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

108,240.00 60,930.00 14,850.00 184,020.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 600.00

0.883 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.30 Pemasangan 1 m pipa HDPE Ø 1000 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa HDPE Ø 1000 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

15%

A.8.4.1.31 Pemasangan 1 m pipa HDPE Ø 1100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

#N/A #N/A #N/A

#N/A

OH OH OH

1.659 0.830 0.166 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

132,720.00 74,700.00 18,260.00 225,680.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 5,400.00

1.093 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

D Jumlah (A+B+C) E Overhead & Profit

#N/A

JUMLAH HARGA (Rp.)

mm

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

0.573 Jumlah Harga Alat

15%

B BAHAN Pipa HDPE Ø 900 mm

B BAHAN Pipa HDPE Ø 1100 mm

HARGA SATUAN (Rp.) 5 6 Jumlah Harga Bahan KOEFISIEN

15%

#N/A #N/A #N/A

#N/A

OH OH OH

1.818 0.909 0.182 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

145,440.00 81,810.00 20,020.00 247,270.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 8,000.00

1.205 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A

#N/A #N/A

NO 1

URAIAN

KODE

SAT

KOEFISIEN

3

4

5

2 F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.32 Pemasangan 1 m pipa HDPE Ø 1200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa HDPE Ø 1200 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa GIP Ø 63 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

2.370 1.185 0.237 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

189,600.00 106,650.00 26,070.00 322,320.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

1.584 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.345 0.172 0.034 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

27,600.00 15,480.00 3,740.00 46,820.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A #VALUE!

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

B BAHAN Pipa GIP Ø 100 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

15%

A.8.4.1.35 Pemasangan 1 m pipa GIP Ø 125 mm A TENAGA

#N/A #N/A #N/A

#N/A

OH OH OH

0.400 0.200 0.040 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

32,000.00 18,000.00 4,400.00 54,400.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

#N/A

#N/A #N/A

Hari Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

OH OH OH

Jumlah Harga Alat

A.8.4.1.34 Pemasangan 1 m pipa GIP Ø 100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.) #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.33 Pemasangan 1 m pipa GIP Ø 63 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 6

15%

#N/A

#N/A #N/A #N/A

NO 1

URAIAN

KODE

SAT

2

3 L.01 L.02 L.04

4 OH OH OH

Pekerja Tukang pipa Mandor B BAHAN Pipa GIP Ø 125 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

M

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.448 80,000.00 35,840.00 0.224 90,000.00 20,160.00 0.045 110,000.00 4,950.00 Jumlah Tenaga Kerja 60,950.00 KOEFISIEN

1.000 Jumlah Harga Bahan

Hari

#N/A

#N/A 0.00

#N/A

#N/A #N/A

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.36 Pemasangan 1 m pipa GIP Ø 150 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa GIP Ø 150 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.506 0.253 0.051 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

40,480.00 22,770.00 5,610.00 68,860.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A #VALUE!

#N/A

#N/A #N/A

Hari Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.37 Pemasangan 1 m pipa GIP Ø 200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa GIP Ø 200 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.796 0.398 0.080 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

63,680.00 35,820.00 8,800.00 108,300.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A #VALUE!

#N/A

#N/A #N/A

Hari Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.38 Pemasangan 1 m pipa GIP Ø 250 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa GIP Ø 250 mm

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.949 0.475 0.095 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

75,920.00 42,750.00 10,450.00 129,120.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2 C PERALATAN Sewa tripot/tackel & handle Crane 2 T

3

4

5

HARGA SATUAN (Rp.) 6

Hari

#N/A Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.39 Pemasangan 1 m pipa GIP Ø 300 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa GIP Ø 300 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

15%

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

0.958 0.479 0.096 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

76,640.00 43,110.00 10,560.00 130,310.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 185,500.00

#N/A

#N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

1.212 0.606 0.121 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

96,960.00 54,540.00 13,310.00 164,810.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 231.00

#N/A

#N/A #N/A

Hari Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.41 Pemasangan 1 m pipa GIP Ø 450 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa GIP Ø 450 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

15%

#N/A #N/A #N/A

#N/A

OH OH OH

1.353 0.676 0.135 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

108,240.00 60,840.00 14,850.00 183,930.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 6,800.00

#N/A

#N/A #N/A

Hari Jumlah Harga Alat

D Jumlah (A+B+C)

#N/A #N/A

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

B BAHAN Pipa GIP Ø 400 mm

7

#N/A #N/A #N/A

#N/A

Jumlah Harga Alat

A.8.4.1.40 Pemasangan 1 m pipa GIP Ø 4 00 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.)

#N/A

NO 1

URAIAN

KODE

SAT

KOEFISIEN

3

4

5 15%

2 E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.42 Pemasangan 1 m pipa GIP Ø 500 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa GIP Ø 500 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

HARGA SATUAN (Rp.) 6 #N/A

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

80,000.00 90,000.00 110,000.00

117,520.00 66,150.00 16,170.00 199,840.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

#N/A

#N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

1.327 0.664 0.133 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

106,160.00 59,760.00 14,630.00 180,550.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 544,452.55

#N/A

#N/A #N/A

Hari Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.44 Pemasangan 1 m pipa GIP Ø 800 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa GIP Ø 800 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

15%

A.8.4.1.45 Pemasangan 1 m pipa GIP Ø 900 mm A TENAGA

#N/A #N/A #N/A

#N/A

OH OH OH

2.327 1.163 0.233 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

186,160.00 104,670.00 25,630.00 316,460.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 32,247.00

#N/A

#N/A #N/A

Hari Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

#N/A #N/A

1.469 0.735 0.147 Jumlah Tenaga Kerja

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

B BAHAN Pipa GIP Ø 600 mm

7

OH OH OH

Jumlah Harga Alat

A.8.4.1.43 Pemasangan 1 m pipa GIP Ø 600 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.)

15%

#N/A

#N/A #N/A #N/A

NO 1

URAIAN

KODE

SAT

2

3 L.01 L.02 L.04

4 OH OH OH

Pekerja Tukang pipa Mandor B BAHAN Pipa GIP Ø 900 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

M

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 2.623 80,000.00 209,840.00 1.312 90,000.00 118,080.00 0.262 110,000.00 28,820.00 Jumlah Tenaga Kerja 356,740.00 KOEFISIEN

1.000 Jumlah Harga Bahan

Hari

#N/A

#N/A 0.00

#N/A

#N/A #N/A

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.46 Pemasangan 1 m pipa GIP Ø 1000 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa GIP Ø 1000 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

15%

#N/A #N/A #N/A

#N/A

OH OH OH

2.911 1.456 0.291 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

232,880.00 131,040.00 32,010.00 395,930.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

#N/A

#N/A #N/A

Hari Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.47 Pemasangan 1 m pipa GIP Ø 1100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa GIP Ø 1100 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

15%

#N/A #N/A #N/A

#N/A

OH OH OH

3.200 1.600 0.320 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

256,000.00 144,000.00 35,200.00 435,200.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A #VALUE!

#N/A

#N/A #N/A

Hari Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.48 Pemasangan 1 m pipa GIP Ø 1200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa GIP Ø 1200 mm

15%

OH OH OH

M

#N/A #N/A #N/A

#N/A

3.488 1.744 0.349 Jumlah Tenaga Kerja 1.000

80,000.00 90,000.00 110,000.00

279,040.00 156,960.00 38,390.00 474,390.00

#N/A

#N/A

NO

URAIAN

KODE

SAT

1

2

3

4

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

HARGA SATUAN (Rp.) 5 6 Jumlah Harga Bahan KOEFISIEN

Hari

#N/A Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.49 Pemasangan 1 m pipa DCI Ø 100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa DCI Ø 100 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

15%

B BAHAN Pipa DCI Ø 125 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa DCI Ø 150 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

36,110.00 #N/A #N/A #N/A #N/A #N/A

#N/A

0.489 0.098 0.049 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

39,120.00 8,820.00 5,390.00 53,330.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 27,000.00

0.380 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.547 0.109 0.055 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

43,760.00 9,810.00 6,050.00 59,620.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.380 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.51 Pemasangan 1 m pipa DCI Ø 150 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

7

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.50 Pemasangan 1 m pipa DCI Ø 125 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.)

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.613 0.123 0.061 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

49,040.00 11,070.00 6,710.00 66,820.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.380 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

NO 1

URAIAN

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

15%

#N/A

2 D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.52 Pemasangan 1 m pipa DCI Ø 200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa DCI Ø 200 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa DCI Ø 250 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa DCI Ø 300 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.55 Pemasangan 1 m pipa DCI Ø 400 mm A TENAGA

#N/A #N/A #N/A

0.855 0.171 0.085 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

68,400.00 15,390.00 9,350.00 93,140.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A #VALUE!

0.380 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.951 0.190 0.095 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

76,080.00 17,100.00 10,450.00 103,630.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.050 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.54 Pemasangan 1 m pipa DCI Ø 300 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

7

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.53 Pemasangan 1 m pipa DCI Ø 250 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.)

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.973 0.195 0.097 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

77,840.00 17,550.00 10,670.00 106,060.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 37,727.75

0.071 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A

#N/A #N/A #N/A

NO 1

URAIAN 2 Pekerja Tukang pipa Operator alat berat Mandor

KODE

SAT

3 L.01 L.02 L. 08 L.04

4 OH OH OH OH

B BAHAN Pipa DCI Ø 300 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

M

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.56 Pemasangan 1 m pipa DCI Ø 450 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Operator alat berat L. 08 Mandor L.04 B BAHAN Pipa DCI Ø 450 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa DCI Ø 500 mm

C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.023 0.031 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

15%

#N/A #N/A #N/A

#N/A

OH OH OH OH

1.813 0.363 0.143 0.181 Jumlah Tenaga Kerja

80,000.00 90,000.00 #N/A 110,000.00

145,040.00 32,670.00 #N/A 19,910.00 #N/A

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 71,300.00

0.029 0.039 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.57 Pemasangan 1 m pipa DCI Ø 500 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Operator alat berat L. 08 Mandor L.04

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 1.545 80,000.00 123,600.00 0.309 90,000.00 27,810.00 0.093 #N/A #N/A 0.154 110,000.00 16,940.00 Jumlah Tenaga Kerja #N/A KOEFISIEN

15%

#N/A #N/A #N/A

#N/A

OH OH OH OH

2.047 0.409 0.193 0.205 Jumlah Tenaga Kerja

80,000.00 90,000.00 #N/A 110,000.00

163,760.00 36,810.00 #N/A 22,550.00 #N/A

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 3,300.00

0.034 0.045 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

Hari

15%

#N/A

#N/A #N/A #N/A

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.8.4.1.58 Pemasangan 1 m pipa DCI Ø 600 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Operator alat berat L. 08 Mandor L.04 B BAHAN Pipa DCI Ø 600 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa DCI Ø 800 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa DCI Ø 900 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

2.011 0.402 0.293 0.201 Jumlah Tenaga Kerja

80,000.00 90,000.00 #N/A 110,000.00

160,880.00 36,180.00 #N/A 22,110.00 #N/A

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 2,000.00

0.058 0.077 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH OH

3.859 0.772 0.493 0.386 Jumlah Tenaga Kerja

80,000.00 90,000.00 #N/A 110,000.00

308,720.00 69,480.00 #N/A 42,460.00 #N/A

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 24,000.00

0.084 0.225 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.60 Pemasangan 1 m pipa DCI Ø 900 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Operator alat berat L. 08 Mandor L.04

JUMLAH HARGA (Rp.)

OH OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.59 Pemasangan 1 m pipa DCI Ø 800 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Operator alat berat L. 08 Mandor L.04

HARGA SATUAN (Rp.) 6

15%

#N/A #N/A #N/A

#N/A

OH OH OH OH

4.995 0.999 0.593 0.499 Jumlah Tenaga Kerja

80,000.00 90,000.00 #N/A 110,000.00

399,600.00 89,910.00 #N/A 54,890.00 #N/A

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.093 0.248 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

Hari

15%

#N/A

#N/A #N/A #N/A

NO

URAIAN

KODE

1 2 3 A.8.4.1.61 Pemasangan 1 m pipa DCI Ø 1000 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Operator alat berat L. 08 Mandor L.04 B BAHAN Pipa DCI Ø 1000 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

SAT

KOEFISIEN

4

5

B BAHAN Pipa DCI Ø 1100 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa DCI Ø 900 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

7

5.931 1.186 0.793 0.693 Jumlah Tenaga Kerja

80,000.00 90,000.00 #N/A 110,000.00

474,480.00 106,740.00 #N/A 76,230.00 #N/A

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.112 0.298 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH OH

6.949 1.390 0.793 0.695 Jumlah Tenaga Kerja

80,000.00 90,000.00 #N/A 110,000.00

555,920.00 125,100.00 #N/A 76,450.00 #N/A

M

1.000 Jumlah Harga Bahan

#N/A

#N/A #REF!

0.152 0.304 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.63 Pemasangan 1 m pipa DCI Ø 1200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Operator alat berat L. 08 Mandor L.04

JUMLAH HARGA (Rp.)

OH OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.62 Pemasangan 1 m pipa DCI Ø 1100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Operator alat berat L. 08 Mandor L.04

HARGA SATUAN (Rp.) 6

15%

#N/A #N/A #N/A

#N/A

OH OH OH OH

8.056 1.611 0.893 0.806 Jumlah Tenaga Kerja

80,000.00 90,000.00 #N/A 110,000.00

644,480.00 144,990.00 #N/A 88,660.00 #N/A

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.18 0.360 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

Hari

15%

#N/A

#N/A #N/A #N/A

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.8.4.1.64 Pemasangan 1 m pipa baja Ø 63 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa Baja Ø 63 mm

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa Baja Ø 100 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa Baja Ø 125 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.67 Pemasangan 1 m pipa baja Ø 150 mm A TENAGA

7

0.499 0.100 0.050 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

39,920.00 9,000.00 5,500.00 54,420.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 15,549.21

0.004 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.579 0.116 0.058 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

46,320.00 10,440.00 6,380.00 63,140.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.004 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.66 Pemasangan 1 m pipa baja Ø 100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.)

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.65 Pemasangan 1 m pipa baja Ø 100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 6

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.648 0.130 0.065 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

51,840.00 11,700.00 7,150.00 70,690.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 13,250.00

0.004 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A

#N/A #N/A #N/A

NO 1

URAIAN

KODE

SAT

2

3 L.01 L.02 L.04

4 OH OH OH

Pekerja Tukang pipa Mandor B BAHAN Pipa Baja Ø 150 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

M

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.68 Pemasangan 1 m pipa baja Ø 200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

B BAHAN Pipa Baja Ø 200 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa Baja Ø 250 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

#N/A

#N/A 0.00

0.004 Jumlah Harga Alat

#N/A

#N/A #N/A #N/A #N/A #N/A

#N/A

OH OH OH

1.113 0.223 0.111 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

89,040.00 20,070.00 12,210.00 121,320.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 9,000.00

0.004 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

1.325 0.265 0.133 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

106,000.00 23,850.00 14,630.00 144,480.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A #REF!

0.004 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.70 Pemasangan 1 m pipa baja Ø 300 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

1.000 Jumlah Harga Bahan

15%

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.69 Pemasangan 1 m pipa baja Ø 250 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.708 80,000.00 56,640.00 0.142 90,000.00 12,780.00 0.071 110,000.00 7,810.00 Jumlah Tenaga Kerja 77,230.00 KOEFISIEN

15%

OH OH OH

#N/A

1.415 0.283 0.141

80,000.00 90,000.00 110,000.00

#N/A #N/A #N/A

113,200.00 25,470.00 15,510.00

NO

URAIAN

KODE

SAT

1

2

3

4

B BAHAN Pipa Baja Ø 300 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T

M

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.1.71 Pemasangan 1 m pipa baja Ø 400 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa Baja Ø 400 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

HARGA SATUAN (Rp.) 5 6 Jumlah Tenaga Kerja KOEFISIEN

JUMLAH HARGA (Rp.) 7 154,180.00

1.000 Jumlah Harga Bahan

#N/A

#N/A 275,192.40

0.004 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

#N/A #N/A #N/A

#N/A

OH OH OH

2.366 0.473 0.237 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

189,280.00 42,570.00 26,070.00 257,920.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.027 0.039 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

Hari

15%

#N/A

#N/A #N/A #N/A

NO

URAIAN

KODE

1 2 3 A.8.4.1.72 Pemasangan 1 m pipa baja Ø 450 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa Baja Ø 450 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

SAT

KOEFISIEN

4

5

B BAHAN Pipa Baja Ø 500 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa Baja Ø 600 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

80,000.00 90,000.00 110,000.00

178,480.00 40,140.00 24,530.00 243,150.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 145,750.00

0.026 0.037 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

2.432 0.486 0.243 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

194,560.00 43,740.00 26,730.00 265,030.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.029 0.045 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

2.208 0.442 0.221 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

176,640.00 39,780.00 24,310.00 240,730.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 1,000.00

0.027 0.039 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.75 Pemasangan 1 m pipa baja Ø 800 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

7

2.231 0.446 0.223 Jumlah Tenaga Kerja

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.74 Pemasangan 1 m pipa baja Ø 600 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.)

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.73 Pemasangan 1 m pipa baja Ø 500 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 6

15%

OH OH OH

#N/A

3.897 0.779 0.390

80,000.00 90,000.00 110,000.00

#N/A #N/A #N/A

311,760.00 70,110.00 42,900.00

NO

URAIAN

KODE

SAT

1

2

3

4

B BAHAN Pipa Baja Ø 800 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

M

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.76 Pemasangan 1 m pipa baja Ø 900 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa Baja Ø 900 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa Baja Ø 1000 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

B BAHAN Pipa Baja Ø 1100 mm C PERALATAN

7 424,770.00

#N/A

#N/A 0.00

0.046 0.098 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A

#N/A

OH OH OH

4.403 0.081 0.440 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

352,240.00 7,290.00 48,400.00 407,930.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.052 0.115 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

Hari

15%

#N/A #N/A #N/A

#N/A

OH OH OH

4.895 0.979 0.489 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

391,600.00 88,110.00 53,790.00 533,500.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 8,628.00

0.058 0.133 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.78 Pemasangan 1 m pipa baja Ø 1100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.)

1.000 Jumlah Harga Bahan

15%

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.77 Pemasangan 1 m pipa baja Ø 1000 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 5 6 Jumlah Tenaga Kerja KOEFISIEN

15%

#N/A #N/A #N/A

#N/A

OH OH OH

5.387 1.077 0.539 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

430,960.00 96,930.00 59,290.00 587,180.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

NO 1

URAIAN

KODE

2 3 Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

SAT 4 Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.1.79 Pemasangan 1 m pipa baja Ø 1200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa Baja Ø 1200 mm C PERALATAN Sewa excavator type 225 kap 0.5 - 1.0 m3 Sewa tripot/tackel & handle Crane 2 T

15%

5.897 1.176 0.588 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

471,760.00 105,840.00 64,680.00 642,280.00

M

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

0.07 0.167 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A

0.005 0.002 0.0005 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

400.00 180.00 55.00 635.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 21,992.08

Hari

0.003 Jumlah Harga Alat

#N/A

#N/A #N/A

Hari

15%

A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA A.8.4.2.1 Pemotongan 1 buah pipa PVC Ø 63 mm A TENAGA Pekerja L.01 OH Tukang pipa L.02 OH Mandor L.04 OH

C PERALATAN Peralatan potong pipa T1/manual (gergaji)/saw D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.2 Pemotongan 1 buah pipa PVC Ø 90 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa PVC Ø 90 mm C PERALATAN Peralatan potong pipa T1/manual (gergaji)/saw D Jumlah (A+B+C) E Overhead & Profit

#N/A #N/A #N/A

#N/A

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

B BAHAN Pipa PVC Ø 63 mm

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.064 #N/A #N/A 0.150 #N/A #N/A Jumlah Harga Alat #N/A KOEFISIEN

15%

#N/A

#N/A #N/A #N/A

#N/A

OH OH OH

0.014 0.007 0.001 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

1,120.00 630.00 110.00 1,860.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 11,706.48

Hari

0.003 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

#N/A

#N/A #N/A

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

A.8.4.2.3 Pemotongan 1 buah pipa PVC Ø 110 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa PVC Ø 110 mm C PERALATAN Peralatan potong pipa T1/manual (gergaji)/saw

B BAHAN Pipa PVC Ø 150 mm C PERALATAN Peralatan potong pipa T1/manual (gergaji)/saw

B BAHAN Pipa PVC Ø 200 mm C PERALATAN Peralatan potong pipa T1/manual (gergaji)/saw

0.022 0.011 0.002 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

1,760.00 990.00 220.00 2,970.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 40,650.00

Hari

0.003 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.031 0.015 0.003 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

2,480.00 1,350.00 330.00 4,160.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 1,500.00

Hari

0.003 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.081 0.040 0.008 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

6,480.00 3,600.00 880.00 10,960.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 24,000.00

Hari

0.017 Jumlah Harga Alat

#N/A

#N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.6 Pemotongan 1 buah pipa PVC Ø 250 mm A TENAGA Pekerja L.01 Tukang pipa L.02

7

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.5 Pemotongan 1 buah pipa PVC Ø 200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.) #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.4 Pemotongan 1 buah pipa PVC Ø 150 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 6

15%

OH OH

#N/A

0.128 0.064

80,000.00 90,000.00

#N/A #N/A #N/A

10,240.00 5,760.00

NO 1

URAIAN

KODE

SAT

2

3 L.04

4 OH

Mandor B BAHAN Pipa PVC Ø 250 mm C PERALATAN Peralatan potong pipa T1/manual (gergaji)/saw

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.030 Jumlah Harga Alat

#N/A

#N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.7 Pemotongan 1 buah pipa PVC Ø 300 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa PVC Ø 300 mm C PERALATAN Peralatan potong pipa T1/manual (gergaji)/saw

15%

B BAHAN Pipa PVC Ø 400 mm C PERALATAN Peralatan potong pipa T1/manual (gergaji)/saw

0.155 0.077 0.015 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

12,400.00 6,930.00 1,650.00 20,980.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.037 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

B BAHAN Pipa PVC Ø 450 mm

#N/A #N/A #N/A

#N/A

OH OH OH

0.331 0.166 0.033 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

26,480.00 14,940.00 3,630.00 45,050.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 7,886.50

Hari

0.086 Jumlah Harga Alat

#N/A

#N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.9 Pemotongan 1 buah pipa PVC Ø 450 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

#N/A #N/A #N/A

#N/A

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.8 Pemotongan 1 buah pipa PVC Ø 400 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.013 110,000.00 1,430.00 Jumlah Tenaga Kerja 17,430.00 KOEFISIEN

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.420 0.210 0.042 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

33,600.00 18,900.00 4,620.00 57,120.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

NO 1

URAIAN 2 C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

KODE

SAT

KOEFISIEN

3

4

5

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.10 Pemotongan 1 buah pipa PVC Ø 500 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa PVC Ø 450 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

B BAHAN Pipa PVC Ø 600 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

B BAHAN Pipa PVC Ø 800 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D Jumlah (A+B+C) E Overhead & Profit

#N/A

JUMLAH HARGA (Rp.) 7 #N/A #N/A #N/A #N/A #N/A

#N/A

OH OH OH

0.518 0.259 0.052 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

41,440.00 23,310.00 5,720.00 70,470.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.069 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

#N/A #N/A #N/A

#N/A

OH OH OH

0.623 0.311 0.062 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

49,840.00 27,990.00 6,820.00 84,650.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.086 Jumlah Harga Alat

#N/A

#N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.12 Pemotongan 1 buah pipa PVC Ø 800 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

0.054 Jumlah Harga Alat

15%

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.11 Pemotongan 1 buah pipa PVC Ø 600 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 6

15%

#N/A #N/A #N/A

#N/A

OH OH OH

1.089 0.545 0.109 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

87,120.00 49,050.00 11,990.00 148,160.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 42,780.00

Hari

0.160 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

#N/A

#N/A #N/A

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

A.8.4.2.13 Pemotongan 1 buah pipa PVC Ø 900 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa PVC Ø 900 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

B BAHAN Pipa PVC Ø 1000 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

B BAHAN Pipa PVC Ø 1100 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

1.141 0.571 0.114 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

91,280.00 51,390.00 12,540.00 155,210.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 10,800.00

Hari

0.168 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

#N/A #N/A #N/A

#N/A

OH OH OH

1.285 0.643 0.129 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

102,800.00 57,870.00 14,190.00 174,860.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.191 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

#N/A #N/A #N/A

#N/A

OH OH OH

1.429 0.715 0.143 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

114,320.00 64,350.00 15,730.00 194,400.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.213 Jumlah Harga Alat

#N/A

#N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.16 Pemotongan 1 buah pipa PVC Ø 1200 mm A TENAGA Pekerja L.01

7

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.15 Pemotongan 1 buah pipa PVC Ø 1100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.) #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.14 Pemotongan 1 buah pipa PVC Ø 1000 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 6

15%

OH

#N/A

1.573

80,000.00

#N/A #N/A #N/A

125,840.00

NO 1

URAIAN

KODE

SAT

2

3 L.02 L.04

4 OH OH

Tukang pipa Mandor B BAHAN Pipa PVC Ø 1200 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D E F A.8.4.2.17 A

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaaan (D+E) Pemotongan 1 buah pipa HDPE Ø 63 mm TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08

B BAHAN Pipa HDPE Ø 63 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 11,175.95

Hari

0.236 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

B BAHAN Pipa HDPE Ø 100 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

0.002 0.001 0.0002 0.0340 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00 #N/A

160.00 90.00 22.00 #N/A #N/A

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 72,426.40

Hari

0.004 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

B BAHAN Pipa HDPE Ø 125 mm

#N/A #N/A #N/A

#N/A

OH OH OH OH

0.006 0.003 0.0010 0.0710 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00 #N/A

480.00 270.00 110.00 #N/A #N/A

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.005 Jumlah Harga Alat

#N/A

#N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.19 Pemotongan 1 buah pipa HDPE Ø 125 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08

#N/A #N/A #N/A

#N/A

OH OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.18 Pemotongan 1 buah pipa HDPE Ø 100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.787 90,000.00 70,830.00 0.157 110,000.00 17,270.00 Jumlah Tenaga Kerja 213,940.00 KOEFISIEN

15%

OH OH OH OH

Bh

#N/A #N/A #N/A

#N/A

0.009 0.005 0.0010 0.0960 Jumlah Tenaga Kerja 1.000

80,000.00 90,000.00 110,000.00 #N/A

720.00 450.00 110.00 #N/A #N/A

#N/A

#N/A

NO

URAIAN

KODE

SAT

1

2

3

4

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.20 Pemotongan 1 buah pipa HDPE Ø 150 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08 B BAHAN Pipa HDPE Ø 150 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

B BAHAN Pipa HDPE Ø 200 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D E F A.8.4.2.22 A

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaaan (D+E) Pemotongan 1 buah pipa HDPE Ø 250 mm TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08

B BAHAN Pipa HDPE Ø 250 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D Jumlah (A+B+C) E Overhead & Profit

0.006 Jumlah Harga Alat

15%

#N/A

JUMLAH HARGA (Rp.) 7 0.00 #N/A #N/A #N/A #N/A #N/A

#N/A

OH OH OH OH

0.016 0.008 0.0020 0.1210 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00 #N/A

1,280.00 720.00 220.00 #N/A #N/A

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.009 Jumlah Harga Alat

#N/A

#N/A #N/A #N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.21 Pemotongan 1 buah pipa HDPE Ø 200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08

HARGA SATUAN (Rp.) 5 6 Jumlah Harga Bahan KOEFISIEN

15%

#N/A

OH OH OH OH

0.044 0.022 0.0040 0.1710 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00 #N/A

3,520.00 1,980.00 440.00 #N/A #N/A

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 12,825.68

Hari

0.017 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

#N/A #N/A #N/A

#N/A

OH OH OH OH

0.067 0.033 0.0070 0.2210 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00 #N/A

5,360.00 2,970.00 770.00 #N/A #N/A

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 3,445.00

Hari

0.023 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

#N/A

#N/A #N/A

NO

URAIAN

KODE

1

2 3 F Harga Satuan Pekerjaaan (D+E) A.8.4.2.23 Pemotongan 1 buah pipa HDPE Ø 300 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08 B BAHAN Pipa HDPE Ø 300 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

SAT

KOEFISIEN

4

5

B BAHAN Pipa HDPE Ø 400 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

B BAHAN Pipa HDPE Ø 450 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

0.090 0.045 0.0090 0.2710 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00 #N/A

7,200.00 4,050.00 990.00 #N/A #N/A

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 11,450.00

Hari

0.030 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

#N/A #N/A #N/A

#N/A

OH OH OH OH

0.177 0.088 0.0180 0.3710 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00 #N/A

14,160.00 7,920.00 1,980.00 #N/A #N/A

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.055 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

#N/A #N/A #N/A

#N/A

OH OH OH OH

0.225 0.113 0.0230 0.4210 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00 #N/A

18,000.00 10,170.00 2,530.00 #N/A #N/A

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 35,650.00

Hari

0.070 Jumlah Harga Alat

#N/A

#N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.26 Pemotongan 1 buah pipa HDPE Ø 500 mm A TENAGA Pekerja L.01 Tukang pipa L.02

7

OH OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.25 Pemotongan 1 buah pipa HDPE Ø 450 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08

JUMLAH HARGA (Rp.) #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.24 Pemotongan 1 buah pipa HDPE Ø 400 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08

HARGA SATUAN (Rp.) 6

15%

OH OH

#N/A

0.277 0.139

80,000.00 90,000.00

#N/A #N/A #N/A

22,160.00 12,510.00

NO 1

URAIAN

KODE

SAT

2

3 L.04 L.08

4 OH OH

Mandor Operator B BAHAN Pipa HDPE Ø 500 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 880.00

Hari

0.085 Jumlah Harga Alat

#N/A

#N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.27 Pemotongan 1 buah pipa HDPE Ø 600 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08 B BAHAN Pipa HDPE Ø 600 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

15%

B BAHAN Pipa HDPE Ø 800 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

0.333 0.167 0.0330 0.5710 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00 #N/A

26,640.00 15,030.00 3,630.00 #N/A #N/A

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 440.00

Hari

0.101 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

B BAHAN Pipa HDPE Ø 900 mm

#N/A #N/A #N/A

#N/A

OH OH OH OH

0.601 0.301 0.0600 0.7710 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00 #N/A

48,080.00 27,090.00 6,600.00 #N/A #N/A

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 1,650.00

Hari

0.179 Jumlah Harga Alat

#N/A

#N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.29 Pemotongan 1 buah pipa HDPE Ø 900 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08

#N/A #N/A #N/A

#N/A

OH OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.28 Pemotongan 1 buah pipa HDPE Ø 800 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.0280 110,000.00 3,080.00 0.4710 #N/A #N/A Jumlah Tenaga Kerja #N/A KOEFISIEN

15%

OH OH OH OH

Bh

#N/A #N/A #N/A

#N/A

0.913 0.456 0.0910 0.8710 Jumlah Tenaga Kerja 1.000

80,000.00 90,000.00 110,000.00 #N/A

73,040.00 41,040.00 10,010.00 #N/A #N/A

#N/A

#N/A

NO

URAIAN

KODE

SAT

1

2

3

4

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.30 Pemotongan 1 buah pipa HDPE Ø 1000 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08 B BAHAN Pipa HDPE Ø 1000 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

B BAHAN Pipa HDPE Ø 1100 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D E F A.8.4.2.32 A

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaaan (D+E) Pemotongan 1 buah pipa HDPE Ø 1200 mm TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08

B BAHAN Pipa HDPE Ø 1200 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D Jumlah (A+B+C)

0.270 Jumlah Harga Alat

15%

#N/A

JUMLAH HARGA (Rp.) 7 1,000.00 #N/A #N/A #N/A #N/A #N/A

#N/A

OH OH OH OH

1.125 0.562 0.1120 0.9710 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00 #N/A

90,000.00 50,580.00 12,320.00 #N/A #N/A

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 20,000.00

Hari

0.332 Jumlah Harga Alat

#N/A

#N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.31 Pemotongan 1 buah pipa HDPE Ø 1100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 Operator L.08

HARGA SATUAN (Rp.) 5 6 Jumlah Harga Bahan KOEFISIEN

15%

#N/A #N/A #N/A

#N/A

OH OH OH OH

1.238 0.619 0.1240 1.0710 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00 #N/A

99,040.00 55,710.00 13,640.00 #N/A #N/A

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.365 Jumlah Harga Alat

#N/A

#N/A #N/A

15%

#N/A #N/A #N/A

#N/A

OH OH OH OH

1.619 0.809 0.1620 1.1710 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00 #N/A

129,520.00 72,810.00 17,820.00 #N/A #N/A

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.477 Jumlah Harga Alat

#N/A

#N/A #N/A #N/A

NO 1

URAIAN 2 E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

A.8.4.2.33 Pemotongan 1 buah pipa GIP Ø 63 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa GIP Ø 63 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

7 #N/A #N/A

0.019 0.010 0.0020 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

1,520.00 900.00 220.00 2,640.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 60,523.00

Hari

Jumlah Harga Alat

15%

63,163.00

63,163.00 9,474.45 72,637.45

mm L.01 L.02 L.04

B BAHAN Pipa GIP Ø 100 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

OH OH OH

0.058 0.029 0.0060 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

4,640.00 2,610.00 660.00 7,910.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.35 Pemotongan 1 buah pipa GIP Ø 125 A TENAGA Pekerja Tukang pipa Mandor

JUMLAH HARGA (Rp.)

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.34 Pemotongan 1 buah pipa GIP Ø 100 A TENAGA Pekerja Tukang pipa Mandor

HARGA SATUAN (Rp.) 6 #N/A

15%

7,910.00

7,910.00 1,186.50 9,096.50

mm L.01 L.02 L.04

B BAHAN Pipa GIP Ø 125 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.36 Pemotongan 1 buah pipa GIP Ø 150 mm A TENAGA

OH OH OH

0.092 0.046 0.0090 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

7,360.00 4,140.00 990.00 12,490.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 11,450.00

Hari

Jumlah Harga Alat

15%

23,940.00

23,940.00 3,591.00 27,531.00

NO 1

URAIAN

KODE

SAT

2

3 L.01 L.02 L.04

4 OH OH OH

Pekerja Tukang pipa Mandor B BAHAN Pipa GIP Ø 150 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

Bh

1.000 Jumlah Harga Bahan

Hari

Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.37 Pemotongan 1 buah pipa GIP Ø 200 A TENAGA Pekerja Tukang pipa Mandor

15%

L.01 L.02 L.04

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

19,390.00 2,908.50 22,298.50

0.340 0.170 0.0340 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

27,200.00 15,300.00 3,740.00 46,240.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

Jumlah Harga Alat

15%

46,240.00

46,240.00 6,936.00 53,176.00

mm L.01 L.02 L.04

B BAHAN Pipa GIP Ø 250 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

OH OH OH

0.475 0.237 0.0470 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

38,000.00 21,330.00 5,170.00 64,500.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 77,654.90

Hari

Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

B BAHAN

19,390.00

#N/A 1,540.00

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.39 Pemotongan 1 buah pipa GIP Ø 300 A TENAGA Pekerja Tukang pipa Mandor

#N/A

mm

B BAHAN Pipa GIP Ø 200 mm

A.8.4.2.38 Pemotongan 1 buah pipa GIP Ø 250 A TENAGA Pekerja Tukang pipa Mandor

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.131 80,000.00 10,480.00 0.066 90,000.00 5,940.00 0.0130 110,000.00 1,430.00 Jumlah Tenaga Kerja 17,850.00 KOEFISIEN

15%

142,154.90

142,154.90 21,323.24 163,478.14

mm L.01 L.02 L.04

OH OH OH

0.504 0.252 0.0500 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

40,320.00 22,680.00 5,500.00 68,500.00

NO 1

URAIAN 2 Pipa GIP Ø 300 mm

KODE

SAT

3

4 Bh

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.40 Pemotongan 1 buah pipa GIP Ø 400 A TENAGA Pekerja Tukang pipa Mandor

L.01 L.02 L.04

0.738 0.369 0.0740 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

59,040.00 33,210.00 8,140.00 100,390.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 11,925.00

Hari

Jumlah Harga Alat

15%

112,315.00

112,315.00 16,847.25 129,162.25

mm L.01 L.02 L.04

B BAHAN Pipa GIP Ø 450 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

OH OH OH

0.848 0.424 0.0850 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

67,840.00 38,160.00 9,350.00 115,350.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

68,500.00 10,275.00 78,775.00

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

B BAHAN Pipa GIP Ø 500 mm

68,500.00

mm

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

A.8.4.2.42 Pemotongan 1 buah pipa GIP Ø 500 A TENAGA Pekerja Tukang pipa Mandor

Jumlah Harga Alat

15%

B BAHAN Pipa GIP Ø 400 mm

A.8.4.2.41 Pemotongan 1 buah pipa GIP Ø 450 A TENAGA Pekerja Tukang pipa Mandor

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 1.000 #N/A #N/A Jumlah Harga Bahan 0.00 KOEFISIEN

15%

115,350.00

115,350.00 17,302.50 132,652.50

mm L.01 L.02 L.04

OH OH OH

0.941 0.471 0.0940 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

75,280.00 42,390.00 10,340.00 128,010.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 11,250.00

Hari

Jumlah Harga Alat

NO 1

URAIAN 2 D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

A.8.4.2.43 Pemotongan 1 buah pipa GIP Ø 600 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa GIP Ø 600 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

15%

B BAHAN Pipa GIP Ø 800 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

B BAHAN Pipa GIP Ø 900 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.46 Pemotongan 1 buah pipa GIP Ø 1000 mm

7 139,260.00 20,889.00 160,149.00

0.864 0.432 0.0860 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

69,120.00 38,880.00 9,460.00 117,460.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #REF!

Hari

Jumlah Harga Alat

15%

#REF! #REF! #REF!

#REF!

OH OH OH

1.567 0.783 0.1570 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

125,360.00 70,470.00 17,270.00 213,100.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 70,605.00

Hari

Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.45 Pemotongan 1 buah pipa GIP Ø 900 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

139,260.00

JUMLAH HARGA (Rp.)

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.44 Pemotongan 1 buah pipa GIP Ø 800 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 6

15%

283,705.00

283,705.00 42,555.75 326,260.75

OH OH OH

1.770 0.885 0.1770 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

141,600.00 79,650.00 19,470.00 240,720.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

Jumlah Harga Alat

15%

240,720.00

240,720.00 36,108.00 276,828.00

NO 1

HARGA SATUAN (Rp.) 6

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

L.01 L.02 L.04

OH OH OH

1.974 0.987 0.1970 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

157,920.00 88,830.00 21,670.00 268,420.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 1,889.25

Hari

Jumlah Harga Alat

A TENAGA Pekerja Tukang pipa Mandor B BAHAN Pipa GIP Ø 1000 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.8.4.2.47 Pemotongan 1 buah pipa GIP Ø 1100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa GIP Ø 1100 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

B BAHAN Pipa GIP Ø 1200 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

80,000.00 90,000.00 110,000.00

174,240.00 98,010.00 23,980.00 296,230.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 16,750.00

Hari

Jumlah Harga Alat

312,980.00

312,980.00 46,947.00 359,927.00

OH OH OH

2.382 1.191 0.2380 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

190,560.00 107,190.00 26,180.00 323,930.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 8,100.00

Hari

Jumlah Harga Alat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

B BAHAN Pipa DCI Ø 100 mm

270,309.25 40,546.39 310,855.64

2.178 1.089 0.2180 Jumlah Tenaga Kerja

15%

A.8.4.2.48 Pemotongan 1 buah pipa GIP Ø 1200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

7

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.49 Pemotongan 1 buah pipa DCI Ø 100 A TENAGA Pekerja Tukang pipa Mandor

270,309.25

JUMLAH HARGA (Rp.)

15%

332,030.00

332,030.00 49,804.50 381,834.50

mm L.01 L.02 L.04

OH OH OH

Bh

0.071 0.014 0.0070 Jumlah Tenaga Kerja 1.000

80,000.00 90,000.00 110,000.00

5,680.00 1,260.00 770.00 7,710.00

#N/A

#N/A

NO

URAIAN

KODE

SAT

1

2

3

4

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.50 Pemotongan 1 buah pipa DCI Ø 125 A TENAGA Pekerja Tukang pipa Mandor

HARGA SATUAN (Rp.) 5 6 Jumlah Harga Bahan KOEFISIEN

0.003 Jumlah Harga Alat

15%

#N/A

15,810.00

JUMLAH HARGA (Rp.) 7 0.00 #N/A 8,100.00 15,810.00 2,371.50 18,181.50

mm L.01 L.02 L.04

OH OH OH

0.112 0.022 0.0110 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

8,960.00 1,980.00 1,210.00 12,150.00

B BAHAN Pipa DCI Ø 125 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 2,947.54

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

0.010 Jumlah Harga Alat

#N/A

#N/A 0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.51 Pemotongan 1 buah pipa DCI Ø 150 A TENAGA Pekerja Tukang pipa Mandor

15%

15,097.54

15,097.54 2,264.63 17,362.17

mm L.01 L.02 L.04

OH OH OH

0.159 0.032 0.0160 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

12,720.00 2,880.00 1,760.00 17,360.00

B BAHAN Pipa DCI Ø 150 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

0.018 Jumlah Harga Alat

#N/A

#N/A 19,650.30

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.52 Pemotongan 1 buah pipa DCI Ø 200 A TENAGA Pekerja Tukang pipa Mandor

15%

37,010.30

37,010.30 5,551.55 42,561.85

mm L.01 L.02 L.04

OH OH OH

0.366 0.073 0.0370 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

29,280.00 6,570.00 4,070.00 39,920.00

B BAHAN Pipa DCI Ø 200 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 800.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

0.054 Jumlah Harga Alat

#N/A

#N/A 0.00

NO 1

URAIAN 2 D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.53 Pemotongan 1 buah pipa DCI Ø 250 A TENAGA Pekerja Tukang pipa Mandor

KODE

SAT

KOEFISIEN

3

4

5

HARGA SATUAN (Rp.) 6

15%

40,720.00

JUMLAH HARGA (Rp.) 7 40,720.00 6,108.00 46,828.00

mm L.01 L.02 L.04

OH OH OH

0.476 0.095 0.0480 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

38,080.00 8,550.00 5,280.00 51,910.00

B BAHAN Pipa DCI Ø 250 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 16,750.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

0.073 Jumlah Harga Alat

#N/A

#N/A 1,305.30

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.54 Pemotongan 1 buah pipa DCI Ø 300 A TENAGA Pekerja Tukang pipa Mandor

15%

69,965.30

69,965.30 10,494.80 80,460.10

mm L.01 L.02 L.04

OH OH OH

0.512 0.102 0.0510 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

40,960.00 9,180.00 5,610.00 55,750.00

B BAHAN Pipa DCI Ø 300 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 7,200.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

0.079 Jumlah Harga Alat

#N/A

#N/A 550.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.55 Pemotongan 1 buah pipa DCI Ø 400 A TENAGA Pekerja Tukang pipa Mandor

15%

63,500.00

63,500.00 9,525.00 73,025.00

mm L.01 L.02 L.04

B BAHAN Pipa DCI Ø 400 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.56 Pemotongan 1 buah pipa DCI Ø 450 mm

OH OH OH

0.941 0.188 0.0940 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

75,280.00 16,920.00 10,340.00 102,540.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.158 Jumlah Harga Alat

#N/A

#N/A

102,540.00

102,540.00 15,381.00 117,921.00

15%

NO 1

KODE

SAT

KOEFISIEN

2

3

4

5

L.01 L.02 L.04

OH OH OH

1.137 0.227 0.1140 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

90,960.00 20,430.00 12,540.00 123,930.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.176 Jumlah Harga Alat

#N/A

#N/A

123,930.00

123,930.00 18,589.50 142,519.50

A TENAGA Pekerja Tukang pipa Mandor B BAHAN Pipa DCI Ø 450 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.57 Pemotongan 1 buah pipa DCI Ø 500 A TENAGA Pekerja Tukang pipa Mandor

15%

L.01 L.02 L.04

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

1.312 0.262 0.1310 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

104,960.00 23,580.00 14,410.00 142,950.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 2,900.30

Hari

0.192 Jumlah Harga Alat

#N/A

#N/A 0.00

15%

145,850.30

145,850.30 21,877.55 167,727.85

mm L.01 L.02 L.04

B BAHAN Pipa DCI Ø 600 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

OH OH OH

1.309 0.262 0.1310 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

104,720.00 23,580.00 14,410.00 142,710.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.192 Jumlah Harga Alat

#N/A

#N/A 795.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.59 Pemotongan 1 buah pipa DCI Ø 800 A TENAGA Pekerja Tukang pipa Mandor

7

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.58 Pemotongan 1 buah pipa DCI Ø 6 00 A TENAGA Pekerja Tukang pipa Mandor

JUMLAH HARGA (Rp.)

mm

B BAHAN Pipa DCI Ø 500 mm

B BAHAN

HARGA SATUAN (Rp.) 6

URAIAN

15%

143,505.00

143,505.00 21,525.75 165,030.75

mm L.01 L.02 L.04

OH OH OH

2.598 0.520 0.2600 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

207,840.00 46,800.00 28,600.00 283,240.00

NO 1

URAIAN 2 Peralatan potong pipa T2 / mekanik / cilinder saw

KODE

SAT

3

4 Bh

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.60 Pemotongan 1 buah pipa DCI Ø 900 A TENAGA Pekerja Tukang pipa Mandor

#N/A

284,140.00

#N/A 0.00 284,140.00 42,621.00 326,761.00

mm L.01 L.02 L.04

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

OH OH OH

3.370 0.674 0.3370 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

269,600.00 60,660.00 37,070.00 367,330.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.381 Jumlah Harga Alat

#N/A

#N/A 8,100.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.61 Pemotongan 1 buah pipa DCI Ø 1000 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa DCI Ø 1000 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

15%

A.8.4.2.62 Pemotongan 1 buah pipa DCI Ø 1100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

375,430.00

375,430.00 56,314.50 431,744.50

OH OH OH

4.021 0.804 0.4020 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

321,680.00 72,360.00 44,220.00 438,260.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 2,947.54

Hari

0.441 Jumlah Harga Alat

#N/A

#N/A 0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

0.310 Jumlah Harga Alat

15%

B BAHAN Pipa DCI Ø 900 mm

B BAHAN Pipa DCI Ø 1100 mm

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 1.000 #N/A #N/A Jumlah Harga Bahan 900.00 KOEFISIEN

15%

441,207.54

441,207.54 66,181.13 507,388.67

OH OH OH

4.731 0.946 0.4730 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

378,480.00 85,140.00 52,030.00 515,650.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.506 Jumlah Harga Alat

#N/A

#N/A 19,650.30

NO 1

URAIAN 2 D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5 15%

A.8.4.2.63 Pemotongan 1 buah pipa DCI Ø 1200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa DCI Ø 1200 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

535,300.30

JUMLAH HARGA (Rp.) 7 535,300.30 80,295.05 615,595.35

OH OH OH

5.502 1.100 0.5500 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

440,160.00 99,000.00 60,500.00 599,660.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 800.00

Hari

0.576 Jumlah Harga Alat

#N/A

#N/A 0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.64 Pemotongan 1 buah pipa baja Ø 63 A TENAGA Pekerja Tukang pipa Mandor

HARGA SATUAN (Rp.) 6

15%

600,460.00

600,460.00 90,069.00 690,529.00

mm L.01 L.02 L.04

B BAHAN Pipa baja Ø 63 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

OH OH OH

0.028 0.006 0.0030 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

2,240.00 540.00 330.00 3,110.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 48,780.00

Hari

0.037 Jumlah Harga Alat

#N/A

#N/A 800.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.65 Pemotongan 1 buah pipa baja Ø 100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa baja Ø 100 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.66 Pemotongan 1 buah pipa baja Ø 125 mm

15%

52,690.00

52,690.00 7,903.50 60,593.50

OH OH OH

0.085 0.017 0.0080 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

6,800.00 1,530.00 880.00 9,210.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 3,500.00

Hari

0.040 Jumlah Harga Alat

#N/A

#N/A 0.00

15%

12,710.00

12,710.00 1,906.50 14,616.50

NO 1

HARGA SATUAN (Rp.) 6

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

L.01 L.02 L.04

OH OH OH

0.133 0.027 0.0130 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

10,640.00 2,430.00 1,430.00 14,500.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.042 Jumlah Harga Alat

#N/A

#N/A 31,500.00

A TENAGA Pekerja Tukang pipa Mandor B BAHAN Pipa baja Ø 125 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.67 Pemotongan 1 buah pipa baja Ø 150 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa baja Ø 150 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

15%

B BAHAN Pipa baja Ø 200 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

46,000.00 6,900.00 52,900.00

0.184 0.037 0.0180 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

14,720.00 3,330.00 1,980.00 20,030.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 21,262.88

Hari

0.045 Jumlah Harga Alat

#N/A

#N/A 0.00

15%

41,292.88

41,292.88 6,193.93 47,486.81

OH OH OH

0.476 0.095 0.0480 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

38,080.00 8,550.00 5,280.00 51,910.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.060 Jumlah Harga Alat

#N/A

#N/A 129,112.55

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.69 Pemotongan 1 buah pipa baja Ø 250 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

7

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.68 Pemotongan 1 buah pipa baja Ø 200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

46,000.00

JUMLAH HARGA (Rp.)

15%

OH OH OH

0.663 0.133 0.0660 Jumlah Tenaga Kerja

181,022.55

80,000.00 90,000.00 110,000.00

181,022.55 27,153.38 208,175.93

53,040.00 11,970.00 7,260.00 72,270.00

NO 1

URAIAN 2 B BAHAN Pipa baja Ø 250 mm

KODE

SAT

KOEFISIEN

3

4

5

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

B BAHAN Pipa baja Ø 300 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

B BAHAN Pipa baja Ø 400 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

#N/A

#N/A 11,925.00

Hari

0.068 Jumlah Harga Alat

#N/A

#N/A 0.00

15%

B BAHAN Pipa baja Ø 450 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

84,195.00

84,195.00 12,629.25 96,824.25

OH OH OH

0.745 0.149 0.0740 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

59,600.00 13,410.00 8,140.00 81,150.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 94,850.00

Hari

0.072 Jumlah Harga Alat

#N/A

#N/A 11,908.00

15%

187,908.00

187,908.00 28,186.20 216,094.20

OH OH OH

1.440 0.288 0.1440 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

115,200.00 25,920.00 15,840.00 156,960.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 84,000.00

Hari

0.105 Jumlah Harga Alat

#N/A

#N/A 5,830.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.72 Pemotongan 1 buah pipa baja Ø 450 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

7

1.000 Jumlah Harga Bahan

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.71 Pemotongan 1 buah pipa baja Ø 400 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.)

Bh

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.70 Pemotongan 1 buah pipa baja Ø 300 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 6

15%

246,790.00

246,790.00 37,018.50 283,808.50

OH OH OH

1.399 0.280 0.1400 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

111,920.00 25,200.00 15,400.00 152,520.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.107 Jumlah Harga Alat

#N/A

#N/A 0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.73 Pemotongan 1 buah pipa baja Ø 500 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa baja Ø 500 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

15%

B BAHAN Pipa baja Ø 600 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

B BAHAN Pipa baja Ø 800 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.76 Pemotongan 1 buah pipa baja Ø 900 mm

7 152,520.00 22,878.00 175,398.00

1.558 0.312 0.1560 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

124,640.00 28,080.00 17,160.00 169,880.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.107 Jumlah Harga Alat

#N/A

#N/A 157,994.76

15%

327,874.76

327,874.76 49,181.21 377,055.97

OH OH OH

1.437 0.287 0.1440 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

114,960.00 25,830.00 15,840.00 156,630.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 2,900.30

Hari

0.113 Jumlah Harga Alat

#N/A

#N/A 0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.2.75 Pemotongan 1 buah pipa baja Ø 800 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

152,520.00

JUMLAH HARGA (Rp.)

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.74 Pemotongan 1 buah pipa baja Ø 600 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 6

15%

159,530.30

159,530.30 23,929.55 183,459.85

OH OH OH

2.624 0.525 0.2620 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

209,920.00 47,250.00 28,820.00 285,990.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.166 Jumlah Harga Alat

#N/A

#N/A 795.00

15%

286,785.00

286,785.00 43,017.75 329,802.75

NO 1

HARGA SATUAN (Rp.) 6

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

L.01 L.02 L.04

OH OH OH

2.971 0.594 0.2970 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

237,680.00 53,460.00 32,670.00 323,810.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 8,100.00

Hari

0.183 Jumlah Harga Alat

#N/A

#N/A 19,350.00

A TENAGA Pekerja Tukang pipa Mandor B BAHAN Pipa baja Ø 900 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.77 Pemotongan 1 buah pipa baja Ø 1000 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Pipa baja Ø 1000 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

15%

B BAHAN Pipa baja Ø 1100 mm C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

351,260.00 52,689.00 403,949.00

3.319 0.664 0.3320 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

265,520.00 59,760.00 36,520.00 361,800.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.201 Jumlah Harga Alat

#N/A

#N/A 60,000.00

15%

421,800.00

421,800.00 63,270.00 485,070.00

OH OH OH

3.667 0.733 0.3670 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

293,360.00 65,970.00 40,370.00 399,700.00

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 142,080.30

Hari

0.218 Jumlah Harga Alat

#N/A

#N/A 0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.79 Pemotongan 1 buah pipa baja Ø 1200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

7

OH OH OH

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.2.78 Pemotongan 1 buah pipa baja Ø 1100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

351,260.00

JUMLAH HARGA (Rp.)

15%

OH OH OH

4.015 0.803 0.4020 Jumlah Tenaga Kerja

541,780.30

80,000.00 90,000.00 110,000.00

541,780.30 81,267.05 623,047.35

321,200.00 72,270.00 44,220.00 437,690.00

NO 1

URAIAN 2 B BAHAN Pipa baja Ø 1200 mm

KODE

SAT

KOEFISIEN

3

4

5

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw

HARGA SATUAN (Rp.) 6

7

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

Hari

0.236 Jumlah Harga Alat

#N/A

#N/A 0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA A.8.4.3.1 Pemasangan 1 buah Valve Ø 150 mm A TENAGA Pekerja L.01 OH 1.429 Tukang pipa L.02 OH 0.715 Mandor L.04 OH 0.1430 Jumlah Tenaga Kerja B BAHAN Valve Ø 150 mm Bh 1.000 Jumlah Harga Bahan C PERALATAN Sewa tripot/tackel & handle Crane 2 T Hari 0.100 Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.3.2 Pemasangan 1 buah Valve Ø 200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.)

15%

437,690.00

437,690.00 65,653.50 503,343.50

80,000.00 90,000.00 110,000.00

114,320.00 64,350.00 15,730.00 194,400.00

#N/A

#N/A 0.00

#N/A

#N/A 0.00

194,400.00

194,400.00 29,160.00 223,560.00

OH OH OH

1.714 0.857 0.1710 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

137,120.00 77,130.00 18,810.00 233,060.00

B BAHAN Valve Ø 200 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

0.300 Jumlah Harga Alat

#N/A

#N/A 0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.3.3 Pemasangan 1 buah Valve Ø 250 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

233,060.00

233,060.00 34,959.00 268,019.00

OH OH OH

1.714 0.857 0.1710 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

137,120.00 77,130.00 18,810.00 233,060.00

B BAHAN Valve Ø 250 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 94,850.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

0.400 Jumlah Harga Alat

#N/A

#N/A 0.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.3.4 Pemasangan 1 buah Valve Ø 300 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 6

15%

327,910.00

JUMLAH HARGA (Rp.) 7 327,910.00 49,186.50 377,096.50

OH OH OH

2.000 1.000 0.2000 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

160,000.00 90,000.00 22,000.00 272,000.00

B BAHAN Valve Ø 300 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 3,500.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

0.500 Jumlah Harga Alat

#N/A

#N/A 0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.3.5 Pemasangan 1 buah Valve Ø 400 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

275,500.00

275,500.00 41,325.00 316,825.00

OH OH OH

3.429 1.715 0.3430 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

274,320.00 154,350.00 37,730.00 466,400.00

B BAHAN Valve Ø 400 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 80,000.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

1.000 Jumlah Harga Alat

#N/A

#N/A 5,500.00

D E F A.8.4.3.6 A

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaaan (D+E) Pemasangan 1 buah Valve Ø 450 mm TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

551,900.00

551,900.00 82,785.00 634,685.00

OH OH OH

3.429 1.715 0.3430 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

274,320.00 154,350.00 37,730.00 466,400.00

B BAHAN Valve Ø 450 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

1.000 Jumlah Harga Alat

#N/A

#N/A 0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.3.7 Pemasangan 1 buah Valve Ø 500 mm A TENAGA

15%

466,400.00

466,400.00 69,960.00 536,360.00

NO

URAIAN

KODE

SAT

2

3 L.01 L.02 L.04

4 OH OH OH

1 Pekerja Tukang pipa Mandor

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 4.000 80,000.00 320,000.00 2.000 90,000.00 180,000.00 0.4000 110,000.00 44,000.00 Jumlah Tenaga Kerja 544,000.00 KOEFISIEN

B BAHAN Valve Ø 500 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

1.000 Jumlah Harga Alat

#N/A

#N/A 183,273.77

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.3.8 Pemasangan 1 buah Valve Ø 600 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

727,273.77

727,273.77 109,091.07 836,364.84

OH OH OH

1.421 0.711 0.1420 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

113,680.00 63,990.00 15,620.00 193,290.00

B BAHAN Valve Ø 600 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 30,938.50

C PERALATAN Sewa tripot/tackel & handle Crane 2 T Mobile crane =< 3 ton

Hari Hari

0.600 0.300 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A 0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.3.9 Pemasangan 1 buah Valve Ø 700 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

224,228.50

224,228.50 33,634.28 257,862.78

OH OH OH

1.429 0.715 0.1430 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

114,320.00 64,350.00 15,730.00 194,400.00

B BAHAN Valve Ø 700 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 10,648.50

C PERALATAN Sewa tripot/tackel & handle Crane 2 T Mobile crane =< 3 ton

Hari Hari

0.500 0.500 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A 37,418.50

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.3.10 Pemasangan 1 buah Valve Ø 800 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN

15%

OH OH OH

1.786 0.893 0.1790 Jumlah Tenaga Kerja

242,467.00

80,000.00 90,000.00 110,000.00

242,467.00 36,370.05 278,837.05

142,880.00 80,370.00 19,690.00 242,940.00

NO

URAIAN

KODE

SAT

2

3

4 Bh

1

Valve Ø 800 mm C PERALATAN Sewa tripot/tackel & handle Crane 2 T Mobile crane =< 3 ton

Hari Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.3.11 Pemasangan 1 buah Valve Ø 900 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 1.000 #N/A #N/A Jumlah Harga Bahan 121,950.00 KOEFISIEN

0.500 0.500 Jumlah Harga Alat

15%

#N/A #N/A

380,308.50

#N/A #N/A 15,418.50 380,308.50 57,046.28 437,354.78

OH OH OH

1.714 0.857 0.1710 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

137,120.00 77,130.00 18,810.00 233,060.00

B BAHAN Valve Ø 900 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 40,500.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T Mobile crane =< 3 ton

Hari Hari

0.750 0.750 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A 121,950.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.3.12 Pemasangan 1 buah Valve Ø 1000 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

395,510.00

395,510.00 59,326.50 454,836.50

OH OH OH

2.571 1.286 0.2570 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

205,680.00 115,740.00 28,270.00 349,690.00

B BAHAN Valve Ø 1000 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T Mobile crane =< 3 ton

Hari Hari

1.000 1.000 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A 45,000.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.3.13 Pemasangan 1 buah Valve Ø 1100 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

394,690.00

394,690.00 59,203.50 453,893.50

OH OH OH

3.000 1.500 0.300 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

240,000.00 135,000.00 33,000.00 408,000.00

B BAHAN Valve Ø 1100 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 245,626.77

C PERALATAN Sewa tripot/tackel & handle Crane 2 T Mobile crane =< 3 ton

Hari Hari

#N/A #N/A

#N/A #N/A

1.000 1.000

NO

URAIAN

KODE

SAT

1

2

3

4

D E F A.8.4.3.14 A

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaaan (D+E) Pemasangan 1 buah Valve Ø 1200 mm TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

KOEFISIEN 5 Jumlah Harga Alat

HARGA SATUAN (Rp.) 6

15%

JUMLAH HARGA (Rp.) 7 0.00

653,626.77

653,626.77 98,044.02 751,670.79

OH OH OH

3.000 1.500 0.3000 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

240,000.00 135,000.00 33,000.00 408,000.00

B BAHAN Valve Ø 1200 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T Mobile crane =< 3 ton

Hari Hari

1.000 1.000 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A 268,792.94

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.3.15 Pemasangan 1 buah Tee Ø 150 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

676,792.94

676,792.94 101,518.94 778,311.88

OH OH OH

0.106 0.053 0.0110 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

8,480.00 4,770.00 1,210.00 14,460.00

B BAHAN Tee Ø 150 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 42,868.80

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

0.028 Jumlah Harga Alat

#N/A

#N/A 0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.3.16 Pemasangan 1 buah Tee Ø 200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

57,328.80

57,328.80 8,599.32 65,928.12

OH OH OH

0.216 0.108 0.0220 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

17,280.00 9,720.00 2,420.00 29,420.00

B BAHAN Tee Ø 200 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

0.029 Jumlah Harga Alat

#N/A

#N/A 0.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

29,420.00

29,420.00 4,413.00 33,833.00

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

A.8.4.3.17 Pemasangan 1 buah Tee Ø 250 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

OH OH OH

0.326 0.163 0.0330 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

26,080.00 14,670.00 3,630.00 44,380.00

B BAHAN Tee Ø 250 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 3,500.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

0.039 Jumlah Harga Alat

#N/A

#N/A 0.00

D E F A.8.4.3.18 A

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaaan (D+E) Pemasangan 1 buah Tee Ø 300 mm TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

47,880.00

47,880.00 7,182.00 55,062.00

OH OH OH

0.436 0.218 0.0440 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

34,880.00 19,620.00 4,840.00 59,340.00

B BAHAN Tee Ø 300 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A 0.00

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

0.500 Jumlah Harga Alat

#N/A

#N/A 13,500.00

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.3.19 Pemasangan 1 buah Tee Ø 400 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

72,840.00

72,840.00 10,926.00 83,766.00

OH OH OH

0.656 0.328 0.0660 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

52,480.00 29,520.00 7,260.00 89,260.00

B BAHAN Tee Ø 400 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

0.500 Jumlah Harga Alat

#N/A

#N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.3.20 Pemasangan 1 buah Tee Ø 450 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04 B BAHAN Tee Ø 450 mm

15%

OH OH OH

Bh

#N/A #N/A #N/A

#N/A

0.766 0.383 0.0770 Jumlah Tenaga Kerja 1.000

80,000.00 90,000.00 110,000.00

61,280.00 34,470.00 8,470.00 104,220.00

#N/A

#N/A

NO

URAIAN

KODE

SAT

1

2

3

4

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.3.21 Pemasangan 1 buah Tee Ø 500 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

HARGA SATUAN (Rp.) 5 6 Jumlah Harga Bahan KOEFISIEN

0.500 Jumlah Harga Alat

15%

#N/A

JUMLAH HARGA (Rp.) 7 #N/A #N/A #N/A #N/A #N/A #N/A

#N/A

OH OH OH

0.876 0.438 0.0880 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

70,080.00 39,420.00 9,680.00 119,180.00

B BAHAN Tee Ø 500 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Sewa tripot/tackel & handle Crane 2 T

Hari

0.600 Jumlah Harga Alat

#N/A

#N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.3.22 Pemasangan 1 buah Tee Ø 600 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

#N/A #N/A #N/A

#N/A

OH OH OH

1.096 0.548 0.1100 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

87,680.00 49,320.00 12,100.00 149,100.00

B BAHAN Tee Ø 600 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Sewa tripot/tackel & handle Crane 2 T Mobile crane =< 3 ton

Hari Hari

0.193 0.096 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.3.23 Pemasangan 1 buah Tee Ø 700 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

#N/A #N/A #N/A

#N/A

OH OH OH

1.316 0.658 0.1320 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

105,280.00 59,220.00 14,520.00 179,020.00

B BAHAN Tee Ø 700 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Sewa tripot/tackel & handle Crane 2 T Mobile crane =< 3 ton

Hari Hari

#N/A #N/A

#N/A #N/A

0.225 0.113

NO

URAIAN

KODE

SAT

1

2

3

4

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.3.24 Pemasangan 1 buah Tee Ø 800 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

KOEFISIEN 5 Jumlah Harga Alat

HARGA SATUAN (Rp.) 6

15%

JUMLAH HARGA (Rp.) 7 #N/A #N/A #N/A #N/A

#N/A

OH OH OH

1.536 0.768 0.1540 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

122,880.00 69,120.00 16,940.00 208,940.00

B BAHAN Tee Ø 800 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Sewa tripot/tackel & handle Crane 2 T Mobile crane =< 3 ton

Hari Hari

0.257 0.129 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.3.25 Pemasangan 1 buah Tee Ø 900 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

#N/A #N/A #N/A

#N/A

OH OH OH

1.756 0.878 0.1760 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

140,480.00 79,020.00 19,360.00 238,860.00

B BAHAN Tee Ø 900 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Sewa tripot/tackel & handle Crane 2 T Mobile crane =< 3 ton

Hari Hari

0.321 0.161 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.3.26 Pemasangan 1 buah Tee Ø 1000 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

15%

#N/A #N/A #N/A

#N/A

OH OH OH

1.976 0.988 0.1980 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

158,080.00 88,920.00 21,780.00 268,780.00

B BAHAN Tee Ø 1000 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Sewa tripot/tackel & handle Crane 2 T Mobile crane =< 3 ton

Hari Hari

0.366 0.183 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit

15%

#N/A

#N/A #N/A

NO 1

URAIAN 2 F Harga Satuan Pekerjaaan (D+E)

KODE

SAT

KOEFISIEN

3

4

5

A.8.4.3.28 Pemasangan 1 buah Tee Ø 1200 mm A TENAGA Pekerja L.01 Tukang pipa L.02 Mandor L.04

JUMLAH HARGA (Rp.) 7 #N/A

OH OH OH

2.416 1.208 0.2420 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

193,280.00 108,720.00 26,620.00 328,620.00

B BAHAN Tee Ø 1200 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Sewa tripot/tackel & handle Crane 2 T Mobile crane =< 3 ton

Hari Hari

0.450 0.225 Jumlah Harga Alat

#N/A #N/A

#N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.4

HARGA SATUAN (Rp.) 6

15%

#N/A #N/A #N/A

#N/A

HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA

A.8.4.4.1 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm A TENAGA Pekerja L.01 OH Tukang pipa L.02 OH Mandor L.04 OH

1.466 0.733 0.1470 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

117,280.00 65,970.00 16,170.00 199,420.00

B BAHAN Pipa Ø 80 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw Sewa Genset 1500 watt Sewa Pompa Submersible 3 m3/h Sewa tripot/tackel & handle Crane 2 T

Hari Hari Hari Hari

0.606 0.075 0.968 0.865 Jumlah Harga Alat

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.4.2 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm A TENAGA Pekerja L.01 OH Tukang pipa L.02 OH Mandor L.04 OH

15%

1.646 0.823 0.1650 Jumlah Tenaga Kerja

#N/A

80,000.00 90,000.00 110,000.00

#N/A #N/A #N/A

131,680.00 74,070.00 18,150.00 223,900.00

NO

URAIAN

KODE

SAT

KOEFISIEN

2

3

4

5

1

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

B BAHAN Pipa Ø 100 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw Sewa Genset 1500 watt Sewa Pompa Submersible 3 m3/h Sewa tripot/tackel & handle Crane 2 T

Hari Hari Hari Hari

0.650 0.159 1.078 0.911 Jumlah Harga Alat

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.8.4.4.3 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm A TENAGA Pekerja L.01 OH Tukang pipa L.02 OH Mandor L.04 OH

#N/A #N/A #N/A

#N/A

2.096 1.048 0.2100 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

167,680.00 94,320.00 23,100.00 285,100.00

B BAHAN Pipa Ø 150 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw Sewa Genset 1500 watt Sewa Pompa Submersible 3 m3/h Sewa tripot/tackel & handle Crane 2 T

Hari Hari Hari Hari

0.760 0.369 1.353 1.026 Jumlah Harga Alat

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.8.4.4.4 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm A TENAGA Pekerja L.01 OH Tukang pipa L.02 OH Mandor L.04 OH

#N/A #N/A #N/A

#N/A

2.546 1.273 0.2550 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

203,680.00 114,570.00 28,050.00 346,300.00

B BAHAN Pipa Ø 200 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw Sewa Genset 1500 watt Sewa Pompa Submersible 3 m3/h Sewa tripot/tackel & handle Crane 2 T

Hari Hari Hari Hari

0.870 0.579 1.628 1.141 Jumlah Harga Alat

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.4.5 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm A TENAGA

15%

#N/A

#N/A #N/A #N/A

NO

URAIAN

KODE

SAT

2

3 L.01 L.02 L.04

4 OH OH OH

1 Pekerja Tukang pipa Mandor

B BAHAN Pipa Ø 250 mm

Bh

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 2.996 80,000.00 239,680.00 1.498 90,000.00 134,820.00 0.3000 110,000.00 33,000.00 Jumlah Tenaga Kerja 407,500.00 KOEFISIEN

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2 C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw Sewa Genset 1500 watt Sewa Pompa Submersible 3 m3/h Sewa tripot/tackel & handle Crane 2 T

3

4

5

Hari Hari Hari Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

HARGA SATUAN (Rp.) 6

0.980 0.789 1.903 1.256 Jumlah Harga Alat

15%

A.8.4.4.6 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm A TENAGA Pekerja L.01 OH Tukang pipa L.02 OH Mandor L.04 OH

#N/A #N/A #N/A #N/A

JUMLAH HARGA (Rp.) 7 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

#N/A

3.446 1.723 0.3450 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

275,680.00 155,070.00 37,950.00 468,700.00

B BAHAN Pipa Ø 300 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw Sewa Genset 1500 watt Sewa Pompa Submersible 3 m3/h Sewa tripot/tackel & handle Crane 2 T

Hari Hari Hari Hari

1.090 0.999 2.178 1.371 Jumlah Harga Alat

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.8.4.4.7 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm A TENAGA Pekerja L.01 OH Tukang pipa L.02 OH Mandor L.04 OH

#N/A #N/A #N/A

#N/A

4.346 2.173 0.4350 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

347,680.00 195,570.00 47,850.00 591,100.00

B BAHAN Pipa Ø 400 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw Sewa Genset 1500 watt Sewa Pompa Submersible 3 m3/h Sewa tripot/tackel & handle Crane 2 T

Hari Hari Hari Hari

1.310 1.419 2.728 1.601 Jumlah Harga Alat

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.4.8 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm A TENAGA Pekerja L.01 OH Tukang pipa L.02 OH Mandor L.04 OH

15%

4.796 2.398 0.4800

#N/A

80,000.00 90,000.00 110,000.00

#N/A #N/A #N/A

383,680.00 215,820.00 52,800.00

NO

URAIAN

KODE

SAT

1

2

3

4

B BAHAN Pipa Ø 450 mm

Bh

HARGA SATUAN (Rp.) 5 6 Jumlah Tenaga Kerja KOEFISIEN

1.000 Jumlah Harga Bahan

#N/A

JUMLAH HARGA (Rp.) 7 652,300.00 #N/A #N/A

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2 C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw Sewa Genset 1500 watt Sewa Pompa Submersible 3 m3/h Sewa tripot/tackel & handle Crane 2 T

3

4

5

Hari Hari Hari Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

HARGA SATUAN (Rp.) 6

1.420 1.629 3.003 1.716 Jumlah Harga Alat

15%

A.8.4.4.9 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm A TENAGA Pekerja L.01 OH Tukang pipa L.02 OH Mandor L.04 OH

#N/A #N/A #N/A #N/A

JUMLAH HARGA (Rp.) 7 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

#N/A

5.246 2.623 0.5250 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

419,680.00 236,070.00 57,750.00 713,500.00

B BAHAN Pipa Ø 500 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw Sewa Genset 1500 watt Sewa Pompa Submersible 3 m3/h Sewa tripot/tackel & handle Crane 2 T

Hari Hari Hari Hari

1.530 1.839 3.278 1.831 Jumlah Harga Alat

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

A.8.4.4.10 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm A TENAGA Pekerja L.01 OH Tukang pipa L.02 OH Mandor L.04 OH

#N/A #N/A #N/A

#N/A

6.146 3.073 0.6150 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

491,680.00 276,570.00 67,650.00 835,900.00

B BAHAN Pipa Ø 600 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw Sewa Genset 1500 watt Sewa Pompa Submersible 3 m3/h Sewa tripot/tackel & handle Crane 2 T

Hari Hari Hari Hari

1.750 2.259 3.828 2.061 Jumlah Harga Alat

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.4.11 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm A TENAGA Pekerja L.01 OH Tukang pipa L.02 OH Mandor L.04 OH B BAHAN

15%

7.046 3.523 0.7050 Jumlah Tenaga Kerja

#N/A

80,000.00 90,000.00 110,000.00

#N/A #N/A #N/A

563,680.00 317,070.00 77,550.00 958,300.00

NO

URAIAN

KODE

SAT

2

3

4 Bh

1 Pipa Ø 700 mm

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw Sewa Genset 1500 watt Sewa Pompa Submersible 3 m3/h Sewa tripot/tackel & handle Crane 2 T

Hari Hari Hari Hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

1.970 2.679 4.378 2.291 Jumlah Harga Alat

15%

A.8.4.4.12 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 800 mm A TENAGA Pekerja L.01 OH Tukang pipa L.02 OH Mandor L.04 OH

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

#N/A

7.946 3.973 0.7950 Jumlah Tenaga Kerja

80,000.00 90,000.00 110,000.00

635,680.00 357,570.00 87,450.00 1,080,700.00

B BAHAN Pipa Ø 800 mm

Bh

1.000 Jumlah Harga Bahan

#N/A

#N/A #N/A

C PERALATAN Peralatan potong pipa T2 / mekanik / cilinder saw Sewa Genset 1500 watt Sewa Pompa Submersible 3 m3/h Sewa tripot/tackel & handle Crane 2 T

Hari Hari Hari Hari

2.190 3.099 4.928 2.521 Jumlah Harga Alat

#N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.5

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 1.000 #N/A #N/A Jumlah Harga Bahan #N/A KOEFISIEN

15%

#N/A #N/A #N/A

#N/A

HARGA SATUAN PEKERJAAN PENGETESAN PIPA

A.8.4.5.1 Pengetesan 1 m pipa Ø 50 mm A TENAGA Pekerja Mandor

L.01 L.04

B BAHAN Air test (air bersih) Bahan bakar Oli

OH OH

0.008 0.0008 Jumlah Tenaga Kerja

80,000.00 110,000.00

640.00 88.00 728.00

M3 Liter Liter

0.002 0.060 0.020 Jumlah Harga Bahan

#N/A #N/A #N/A

#N/A #N/A #N/A #N/A

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.5.2 Pengetesan 1 m pipa Ø 75 mm A TENAGA Pekerja

15%

L.01

OH

#N/A

0.008

80,000.00

#N/A #N/A #N/A

640.00

NO 1

URAIAN

KODE

SAT

2

3 L.04

4 OH

Mandor B BAHAN Air test (air bersih) Bahan bakar Oli

M3 Liter Liter

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.0008 110,000.00 88.00 Jumlah Tenaga Kerja 728.00 KOEFISIEN

0.004 0.060 0.002 Jumlah Harga Bahan

#N/A #N/A #N/A

#N/A #N/A #N/A #N/A

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.5.3 Pengetesan 1 m pipa Ø 100 mm A TENAGA Pekerja Mandor

15%

L.01 L.04

OH OH

0.008 0.0008 Jumlah Tenaga Kerja

#N/A

80,000.00 110,000.00

#N/A #N/A #N/A

640.00 88.00 728.00

NO 1

URAIAN 2 B BAHAN Air test (air bersih) Bahan bakar Oli

KODE

SAT

KOEFISIEN

3

4

5

M3 Liter Liter

HARGA SATUAN (Rp.) 6

0.008 0.060 0.002 Jumlah Harga Bahan

#N/A #N/A #N/A

JUMLAH HARGA (Rp.) 7 #N/A #N/A #N/A #N/A

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.5.4 Pengetesan 1 m pipa Ø 150 mm A TENAGA Pekerja Mandor

15%

L.01 L.04

B BAHAN Air test (air bersih) Bahan bakar Oli

#N/A #N/A #N/A

#N/A

OH OH

0.008 0.0008 Jumlah Tenaga Kerja

80,000.00 110,000.00

640.00 88.00 728.00

M3 Liter Liter

0.018 0.060 0.002 Jumlah Harga Bahan

#N/A #N/A #N/A

#N/A #N/A #N/A #N/A

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.5.5 Pengetesan 1 m pipa Ø 200 mm A TENAGA Pekerja Mandor

15%

L.01 L.04

B BAHAN Air test (air bersih) Bahan bakar Oli

#N/A #N/A #N/A

#N/A

OH OH

0.008 0.0008 Jumlah Tenaga Kerja

80,000.00 110,000.00

640.00 88.00 728.00

M3 Liter Liter

0.031 0.060 0.002 Jumlah Harga Bahan

#N/A #N/A #N/A

#N/A #N/A #N/A #N/A

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.5.6 Pengetesan 1 m pipa Ø 250 mm A TENAGA Pekerja Mandor B BAHAN Air test (air bersih)

15%

L.01 L.04

OH OH

M3

#N/A #N/A #N/A

#N/A

0.008 0.0008 Jumlah Tenaga Kerja 0.049

80,000.00 110,000.00

640.00 88.00 728.00

#N/A

#N/A

NO 1

URAIAN

KODE

SAT

2

3

4 Liter Liter

Bahan bakar Oli

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 0.060 #N/A #N/A 0.002 #N/A #N/A Jumlah Harga Bahan #N/A KOEFISIEN

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.5.7 Pengetesan 1 m pipa Ø 300 mm A TENAGA Pekerja Mandor

15%

L.01 L.04

B BAHAN Air test (air bersih) Bahan bakar Oli

#N/A #N/A #N/A

#N/A

OH OH

0.008 0.0008 Jumlah Tenaga Kerja

80,000.00 110,000.00

640.00 88.00 728.00

M3 Liter Liter

0.071 0.060 0.002 Jumlah Harga Bahan

#N/A #N/A #N/A

#N/A #N/A #N/A #N/A

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.5.8 Pengetesan 1 m pipa Ø 400 mm A TENAGA Pekerja Mandor

15%

L.01 L.04

B BAHAN Air test (air bersih) Bahan bakar Oli

#N/A #N/A #N/A

#N/A

OH OH

0.008 0.0008 Jumlah Tenaga Kerja

80,000.00 110,000.00

640.00 88.00 728.00

M3 Liter Liter

0.126 0.060 0.002 Jumlah Harga Bahan

#N/A #N/A #N/A

#N/A #N/A #N/A #N/A

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.5.9 Pengetesan 1 m pipa Ø 500 mm A TENAGA Pekerja Mandor B BAHAN Air test (air bersih) Bahan bakar Oli C PERALATAN

15%

L.01 L.04

#N/A #N/A #N/A

#N/A

OH OH

0.008 0.0008 Jumlah Tenaga Kerja

80,000.00 110,000.00

640.00 88.00 728.00

M3 Liter Liter

0.158 0.060 0.002 Jumlah Harga Bahan

#N/A #N/A #N/A

#N/A #N/A #N/A #N/A

NO

URAIAN

KODE

SAT

KOEFISIEN

1

2

3

4

5

HARGA SATUAN (Rp.) 6

JUMLAH HARGA (Rp.) 7

Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.5.10 Pengetesan 1 m pipa Ø 600 mm A TENAGA Pekerja Mandor

15%

L.01 L.04

B BAHAN Air test (air bersih) Bahan bakar Oli

#N/A #N/A #N/A

#N/A

OH OH

0.008 0.0008 Jumlah Tenaga Kerja

80,000.00 110,000.00

640.00 88.00 728.00

M3 Liter Liter

0.283 0.060 0.002 Jumlah Harga Bahan

#N/A #N/A #N/A

#N/A #N/A #N/A #N/A

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

A.8.4.6 A.8.4.6.1

15%

HARGA SATUAN PEKERJAAN ELEKTRIKAL (K3) Pemasangan 1 buah titik lampu A TENAGA Pekerja L.01 B BAHAN Pipa listrik 5/8" Kabel T Dus L Bow Las Dop Klem Mangkok Saklar Fitting

#N/A

#N/A #N/A #N/A

%

1.000 Jumlah Tenaga Kerja

80,000.00

80,000.00 80,000.00

btg m buah buah buah buah buah buah buah

3.000 24.000 3.000 4.000 3.000 24.000 1.000 1.000 1.000 Jumlah Harga Bahan

4,200.00 1,800.00 800.00 400.00

12,600.00 43,200.00 2,400.00 1,600.00 0.00 144,000.00 2,000.00 10,500.00 5,000.00 221,300.00

6,000.00 2,000.00 10,500.00 5,000.00

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.8.4.6.2

(K3) Pemasangan 1 buah MCB A TENAGA Pekerja B BAHAN Pipa listrik 5/8" Kabel T Dus L Bow

15%

L.01

%

btg m buah buah

1.000 Jumlah Tenaga Kerja 3.000 15.000 1.000 2.000

301,300.00

301,300.00 45,195.00 346,495.00

80,000.00

80,000.00 80,000.00

4,200.00 1,800.00 800.00 400.00

12,600.00 27,000.00 800.00 800.00

NO 1

URAIAN

KODE

SAT

2

3

4 buah buah

Klem biasa MCB

HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.) 5 6 7 24.000 6,000.00 144,000.00 24.000 21,800.00 523,200.00 Jumlah Harga Bahan 708,400.00 KOEFISIEN

C PERALATAN Jumlah Harga Alat D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)

15%

788,400.00 118,260.00 906,660.00

788,400.00

Nganjuk,

2018

Mengetahui Kepala Dinas Pekerjaan Umum dan Penataan Ruang Kabupaten Nganjuk

Ir. FADJAR JUDIONO, M. Si Pembina Utama Muda NIP. 19640311 199303 1 012

KODE KECAMATAN

Kerikil (Maks 30mm) 8

=

DAFTAR UPAH PEKERJA KECAMATAN LOCERET NO

JENIS KEGIATAN PERORANGAN

SATUAN

UPAH

1

Tukang Batu

1 Hr

90,000.00

2

Tukang Kayu

1 Hr

90,000.00

3

Tukang Besi

1 Hr

90,000.00

4 5 6 7 8 9 10 11 12

Tukang Aspal Tukang Cat Tukang pipa Tukang las konstruksi Kepala Tukang Pekerja Mandor Operator Crane Pembantu operator Crane

1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr

90,000.00 90,000.00 90,000.00 90,000.00 100,000.00 80,000.00 110,000.00 150,000.00 100,000.00 Nganjuk,

2018

Mengetahui Kepala Dinas PU dan Penataan Ruang Kabupaten Nganjuk

Ir. FADJAR JUDIONO, M. Si Pembina Utama Muda NIP. 19640311 199303 1 012

DAFTAR HARGA BAHAN BANGUNAN KECAMATAN LOCERET

No

URAIAN BAHAN

SATUAN

HARGA (Rp)

1

Air

lt

50.00

2

Aqua Proof

kg

48,800.00

3

Asbes gelombang besar Uk. 1,80 x ,9 x 0,4 Cm

Lbr

79,100.00

4

Asbes gelombang kecil Uk. 3.0 x 1.05 x 0.4 Cm

Lbr

75,100.00

5

Avoor / Bak Mandi Biasa

Bh

13,800.00

6

Avoor / Bak Mandi Stainless

Bh

151,000.00

7

Avoor /KM Biasa

Bh

22,200.00

8

Avoor /KM Stainlees

Bh

124,000.00

9

Besi profil

kg

13,420.00

10

Bak cuci tangan stenlis

bh

173,300.00

11

Bak cuci tangan wastafel

bh

257,800.00

12

Bak mandi fiber glaas

bh

306,900.00

13

Balok Kayu Jati Lokal



12,138,800.00

14

Balok Kayu Jati Perhutani



18,000,000.00

15

Balok Kayu Kamper



6,877,000.00

16

Balok Kayu Kruing



5,720,000.00

17

Balok Kayu Meranti



5,419,400.00

18

Balok Kayu Tahun (Mauni)



5,500,000.00

19

Bambu Ori P ; 4 m

Bt

22,500.00

20

Bata merah

Bji

650.00

21

Bata ringan

Bh

8,900.00

22

Bataco

Bh

3,700.00

23

Batu Ampyangan

kg

5,000.00

24

Batu belah / batu kali



182,000.00

25

Batu belah 10 - 15 / 10 - 20 cm



182,000.00

26

Batu belah 15 - 25 cm



182,000.00

27

Batu Candi 10/20 cm

M2

120,000.00

28

Batu Lempeng



70,000.00

29

Batu pecah 2-3 cm (pecah mesin)



306,000.00

30

Batu pecah 2-3 cm (pecah mesin)



306,000.00

31

Batu pecah 5-7 cm



306,000.00

32

Baut baja/Begel

kg

18,000.00

33

Besi beton

kg

9,200.00

34

Besi beton ulir

kg

9,600.00

35

Besi beugel/baut

kg

13,420.00

36

Besi Kanal C

kg

13,420.00

37

Besi Kanal C 10/UNP

kg

182,000.00

38

Besi Plat

kg

13,420.00

39

Besi Plat Strip

kg

13,420.00

40

Besi Siku

kg

13,420.00

41

Beton roosteer lokal

bh

14,200.00

42

Bubung asbes gel besar ( ardek 1 stel 2 lbr )

bh

63,000.00

43

Bubung asbes gel kecil ( ardek 1 stel 2 lbr )

bh

34,700.00

44

Buis Beton Dia 15 cm

M'

36,200.00

45

Buis Beton Dia 20 cm

M'

45,600.00

47

Buis Beton Dia 30 cm

M'

63,200.00

48

Buis Beton Dia 40 cm

M'

74,500.00

49

Buis Beton Dia 50 cm

M'

74,900.00

50

Buis Beton Dia 60 cm

M'

69,700.00

51

Buis Beton Dia 80 cm

M'

82,900.00

52

Buis Beton U 15 cm

M'

23,700.00

53

Buis Beton U 20 cm

M'

29,500.00

54

Buis Beton U 30 cm

M'

36,200.00

55

Buis Beton U 40 cm

M'

48,200.00

56

Buis Beton U 50 cm

M'

90,000.00

57

Cat Genteng

kg

38,700.00

58

Cat Meny

kg

22,200.00

59

Cat meny besi

kg

36,000.00

60

Cat meny Kayu

kg

30,600.00

61

Cat penutup

kg

54,600.00

62

Cat penutup (besi/kayu)

kg

54,000.00

63

Cat Tembok Eksterior

kg

99,100.00

64

Cat Tembok Interior

kg

21,700.00

65

Coating

kg

65,000.00

66

Daun jendela aluminium (0.6x1.1) lengkap

bh

430,000.00

67

Daun pintu aluminium kaca 5 mm (engsel biasa) lengkap

bh

950,000.00

68

Dempul kayu

kg

30,100.00

69

Dolken Kayu Jati Ø 8 - 10 / 400 cm

Bt

75,000.00

70

Dolken Kayu Ø 8 - 10 / 400 cm

Bt

25,000.00

71

Door Closer

bh

198,700.00

72

Door Holder

bh

160,000.00

73

Door Stoper

bh

30,900.00

74

Engsel jendela ( H )

bh

14,100.00

75

Engsel jendela (Arch)

bh

15,200.00

76

Engsel pintu ( H )

bh

17,500.00

77

Engsel pintu (Arch)

bh

31,200.00

78

Eternit (asbes)



24,200.00

79

Formika

Lbr

80

Genteng beton

bh

5,500.00

81

Genteng Bubung beton

Bh

7,000.00

82

Genteng Bubung Glazzur

bh

20,000.00

83

Genteng bubung kodok

bh

3,400.00

84

Genteng Glazzur

bh

11,000.00

85

Genteng kaca

bh

9,900.00

86

Genteng kodok

bh

2,000.00

87

Genteng pres

bh

1,800.00

88

Genting mantili

bh

2,300.00

89

Granite Tile 40x40



132,500.00

90

Granite Tile 60x60



126,000.00

91

Grendel jendela

bh

8,000.00

92

Grendel pintu

bh

21,600.00

93

Gypsum board ( 1.2 x 2.4 cm )

Lbr

61,000.00

94

Hak angin

Stel

15,100.00

95

Handel Jendela

Bh

9,900.00

96

Jendela besi



97

Kaca bening Uk. 3 mm



97,500.00

98

Kaca bening Uk. 5 mm



95,000.00

-

-

99

Kaca ray-band Uk. 5mm



91,600.00

100

Kanstin 40x20x10 cm

bh

10,400.00

101

Kanstin 40x25x15 cm

bh

28,700.00

102

Kanstin 60x30x20 cm

bh

53,900.00

103

Kanstin 60x40x15 cm

bh

47,100.00

104

Kapur Pasang



105

Kawat Baja / bendrat

kg

20,000.00

-

106

Kawat Burung



19,400.00

107

Kawat duri

M'

19,800.00

108

Kawat Harmonika



29,400.00

109

Kawat kasa



23,200.00

110

Kawat las

kg

31,800.00

111

Kawat nyamuk



18,100.00

112

Kayu 5/7

m3

5,500,000.00

113

Kayu papan 3/20

114

Kertas gosok (rempelas)

Lbr

4,100.00

115

Kloset duduk + Aksesoris

bh

1,505,800.00

116

Kloset duduk biasa

bh

476,200.00

117

Kloset jongkok keramik warna tua

bh

160,000.00

118

Kloset jongkok keramik warna muda

bh

137,600.00

119

Koral beton



306,000.00

120

Kran Dia 1/2

bh

21,800.00

121

Kran Dia 3/4

bh

27,400.00

122

Kuas

bh

12,700.00

123

Kusen aluminium coklat 3"

m'

67,000.00

124

Kusen aluminium coklat 4"

m'

77,000.00

125

Kusen aluminium silver 3"

m'

55,000.00

126

Kusen aluminium silver 4"

m'

67,000.00

127

Lem (kayu + tembok)

kg

12,800.00

128

List Eternit

M'

7,600.00

129

List gypsum besar

m'

19,500.00

130

List gypsum kecil

m'

16,500.00

131

List Profil kayu besar

M'

18,000.00

132

List Profil kayu kecil

M'

9,800.00

133

Magnet Pintu

bh

31,200.00

134

Meni besi

kg

36,000.00

135

Meteran

Bh.

21,600.00

136

Minyak Cat ( Thinner A )

Ltr

27,600.00

137

Minyak cat ( Thinner B )

Ltr

18,300.00

138

Minyak Pelumas

Ltr

24,000.00

139

Paku 2"- 3"

140

Paku asbes

kg

49,000.00

141

Paku biasa 2"-5"

kg

16,400.00

142

Paku eternit / triplek

kg

33,900.00

143

Paku kait

kg

500.00

144

Paku sekrup

bh

300.00

145

Paku seng (Paku payung)

Kg

43,600.00

146

Paku Usuk/reng

kg

16,400.00

147

Papan Kayu Bauwplank / Begisting



860,100.00

148

Papan Kayu Jati Kampung



15,000,000.00

149

Papan Kayu Jati Perhutani

150

Papan Kayu Kamper



9,516,600.00

151

Papan Kayu Kruing



8,312,500.00

5,583,300.00

16,400.00

25,000,000.00

152

Papan Kayu Meranti



5,583,300.00

154

Papan Kayu Tahun (Mauni)



5,000,000.00

155

Pasir beton



265,000.00

156

Pasir Pasang



265,000.00

157

Pasir urug



166,000.00

158

Paving 21x10,5x6 cm (polos)

m2

57,500.00

159

Paving 21x10,5x8 cm (polos)

m2

76,000.00

160

Pintu dan Kusen aluminium KM

Set

545,000.00

161

Pintu dan Kusen PVC

Set

223,100.00

162

Pipa Galvanis Dia 1"

M'

15,000.00

163

Pipa Galvanis Dia 1/2"

M'

12,000.00

164

Pipa Galvanis Dia 3/4"

M'

16,100.00

165

Pipa kurasan

bh

10,500.00

166

Pipa PVC AW Dia 1"

M'

8,300.00

167

Pipa PVC AW Dia 1,5"

M'

13,200.00

168

Pipa PVC AW Dia 1/2"

M'

6,900.00

169

Pipa PVC AW Dia 2"

M'

20,200.00

170

Pipa PVC AW Dia 3"

M'

32,300.00

171

Pipa PVC AW Dia 3/4"

M'

6,800.00

172

Pipa PVC AW Dia 4"

M'

49,200.00

173

Pipa PVC Tpe C Dia 3/4 "

m'

4,600.00

174

Plamur kayu

kg

27,500.00

175

Plamur tembok

kg

11,600.00

176

Politur

Ltr

56,700.00

177

Politur jadi

Ltr

53,500.00

178

Pompa Air National / Smizhu

Bh

519,200.00

179

Pompa Jet Pump Groundfos

Bh

1,408,300.00

180

Profil kaca

M'

25,000.00

181

Residu

Lti

18,000.00

182

Rolling door aluminium



350,000.00

183

Saklar ganda

bh

17,900.00

184

Saklar tunggal

bh

14,200.00

185

Seal tape

bh

3,000.00

186

Sealant

tube

23,100.00

187

Semen abu-abu/PC

kg

1,145.00

188

Semen merah



31,200.00

189

Semen portland

Zak

45,800.00

190

Semen Putih/ Warna (40 kg/zak )

Zak

88,000.00

191

Semen warna

kg

8,000.00

192

Seng Gelombang BJLS 20 x 3 m

Lbr

79,500.00

193

Seng Gelombang BJLS 30 x 3 m

Lbr

91,300.00

194

Seng Talang BJLS 30 x 60 cm

Lbr

23,700.00

195

Seng Talang BJLS 30 x 90 cm

Lbr

32,800.00

196

Serat Fiber



1,900.00

197

Sirtu



188,000.00

198

Skrup fixer

bh

1,000.00

199

Slot (kunci-kunci pintu) lokal 2x Putar

bh

90,900.00

200

Sock Drat D 3/4"

bh

2,500.00

201

Solar

Ltr

5,700.00

202

Talang karet 60 cm

m'

11,600.00

203

Tanah liat



65,000.00

204

Tanah urug



160,000.00

205

Tandon Air 500 ltr

Bh

781,800.00

206 207 208 209 210 211 212

Tegel Keramik Dinding Motif 20x25 Tegel Keramik Dinding Motif 25x40 Tegel Keramik Dinding Polos 20x25 Tegel Keramik Dinding Polos 25x40 Tegel Keramik Lantai Motif 20x20 Tegel Keramik Lantai Motif 30x30 Tegel Keramik Lantai Motif 40x40

M² M² M² M² M² M² M²

60,700.00 59,100.00 54,500.00 57,800.00 47,600.00 47,500.00 57,900.00

213

Tegel Keramik Lantai Polos 20x20



51,000.00

214

Tegel Keramik Lantai Polos 30x30



41,700.00

215 217 218 219 220 221 222 223 224 225 226

Tegel Keramik Lantai Polos 40x40 Tegel Plint Granite 10x40 Tegel Plint Granite 10x60 Tegel Plint Keramik 10x20 Tegel Plint Keramik 10x40 Tekwood dilapis aluminium Tepung Gypsum Topi Uskup 30x21x6 cm (polos) Topi Uskup 30x21x8 cm (polos) Triplek Triplek 3 mm

M² bh bh bh bh Lbr kg bh bh Lbr Lbr

45,800.00 6,000.00 30,000.00 600.00 3,700.00 67,500.00 2,700.00 5,800.00 6,200.00 93,300.00 49,200.00

227 228

Triplek 4 mm Vernis

Lbr Ltr Nganjuk,

65,000.00 42,000.00 2018

Mengetahui Kepala Dinas Pekerjaan Umum dan Penataan Ruang Kabupaten Nganjuk

Ir. FADJAR JUDIONO, M. Si Pembina Utama Muda NIP. 19640311 199303 1 012

KELOMPOK BARANG : ALAT-ALAT & BAHAN LISTRIK NO NAMA BARANG 1 Box panel PVC isi 4 MCB 2 Bohlam LED Philips 13 W 3 Bohlam LED Philips 3 W 4 Bohlam LED Philips 4 W 5 Bohlam LED Philips 6 W 6 Bohlam SL Philips 18 W 7 Bohlam SL Philips 23 W 8 Bohlam SL Philips 42 W Spiral 9 Down light / PLC 13 watt 10 Fitting lampu SL 11 Handle 15 A 12 Isolasi Plastik 13 Kabel NYA Enterna 1,5 mm 14 Kabel NYA Enterna 2,5 mm 15 Kabel NYM Enterna 2 x 1,5 mm 16 Kabel NYM Enterna 2 x 2,5 mm 17 Kabel NYM Enterna 3 x 1,5 mm 18 Kabel NYM Enterna 3 x 2,5 mm 19 Kabel NYY Enterna 2 x 1,5 mm 20 Kabel NYY Enterna 2 x 2,5 mm 21 Kabel NYY Enterna 3 x 2,5 mm 22 Kabel Twoested enterna 2 x10 mm 23 Kap Lampu TL 40 W 24 Knee PVC 1" 25 Konektor 26 Lampu TL 2 x 18 watt grille 27 Lampu TL 2 x 36 watt grille 28 Lampu TL Philip 40 W 29 L Bow 30 Mangkok 31 Mcb 2 A 32 Mcb 4 A 33 Mcb 6 A 34 Pipa PVC ⁵/₈ 35 Saklar Ganda Broco 36 Saklar Tunggal Broco 37 Klem 38 Stop Kontak Lubang 2 39 Stop Kontak Lubang 3 40 Stop Kontak Lubang 4 41 Stop Kontak Tanam Brocco 42 Stop Kontak Tempel Broco 43 T Dus 44 Kabel telephone 45 Outlet TV Broco 46 Outlet Telephone

SATUAN buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah meter meter meter meter meter meter meter meter meter meter meter meter meter meter meter meter meter meter meter

HARGA NETT 21,800.00 40,900.00 17,700.00 21,500.00 29,000.00 29,000.00 34,500.00 53,800.00 46,500.00 5,000.00 27,500.00 4,500.00 1,800.00 3,000.00 6,200.00 8,200.00 7,100.00 10,500.00 8,800.00 12,100.00 14,900.00 4,500.00 34,000.00 500.00 3,500.00 12,500.00 15,000.00 18,000.00 400.00 2,000.00 35,100.00 35,100.00 32,600.00 4,200.00 14,000.00 10,500.00 6,000.00 9,700.00 12,700.00 13,200.00 11,200.00 9,700.00 800.00 15,000.00 40,000.00 40,000.00 Nganjuk,

2018

Mengetahui Kepala Dinas Pekerjaan Umum dan Penataan Ruang Kabupaten Nganjuk

Ir. FADJAR JUDIONO, M. Si Pembina Utama Muda NIP. 19640311 199303 1 012

Penataan Ruang Kabupaten Nganjuk

Ir. FADJAR JUDIONO, M. Si Pembina Utama Muda NIP. 19640311 199303 1 012

KECAMATAN NGANJU KECAMATAN SUKOMORO KECAMATAN WILANGAN KECAMATAN BAGOR KECAMATAN BERBEK

0 KECAMATAN LOCERET

KECAMATAN SAWAHA KECAMATAN LOCERET KECAMATAN NGETOS KECAMATAN LOCERET KECAMATAN KERTOSONO KECAMATAN NGRONGGOT KECAMATAN BARON

0

0

KECAMATAN PATIANROWO KECAMATAN GONDANG KECAMATAN REJOSO KECAMATAN LENGKONG KECAMATAN JATIKALEN KECAMATAN NGLUYU

0

KECAMATAN PACE KECAMATAN TANJUNGANOM KECAMATAN PRAMBON

1 2 3 4 5 6 7 8

Batu kali pecah 15/20 Batu pecah 2-3 cm Pasir urug Pasir brantas Sirtu Tanah urug Batu pecah 1-2 cm Batu pecah 5-7

Nganjuk 1 182,000.00 306,000.00 166,000.00 265,000.00 188,000.00 160,000.00 311,000.00 193,000.00

Sukomoro 2 182,000.00 306,000.00 166,000.00 265,000.00 188,000.00 160,000.00 311,000.00 193,000.00

1

0

182000

2 3

0 0

306000 166000

4 5

0 0

265000 188000

6

0 0 0

160000 311000 193000

Batu kali pecah 15/20 Batu pecah 2-3 cm Pasir urug Pasir brantas Sirtu Tanah urug Batu pecah 1-2 cm Batu pecah 5-7

7 8

Wilangan 3 180,000.00 303,000.00 163,000.00 262,000.00 185,000.00 158,000.00 309,000.00 191,000.00

Bagor 4 180,000.00 303,000.00 163,000.00 262,000.00 185,000.00 158,000.00 309,000.00 191,000.00

Berbek 5 182,000.00 306,000.00 166,000.00 265,000.00 188,000.00 160,000.00 311,000.00 193,000.00

Sawahan 6 185,000.00 308,000.00 168,000.00 267,000.00 190,000.00 163,000.00 314,000.00 196,000.00

182000 306000 166000 265000 188000 160000 311000 193000

Ngetos 7 185,000.00 308,000.00 168,000.00 267,000.00 190,000.00 163,000.00 314,000.00 196,000.00

Loceret 8 182,000.00 306,000.00 166,000.00 265,000.00 188,000.00 160,000.00 311,000.00 193,000.00

Kertosono 9 182,000.00 306,000.00 166,000.00 265,000.00 188,000.00 160,000.00 311,000.00 193,000.00

Ngronggot 10 182,000.00 306,000.00 166,000.00 265,000.00 188,000.00 160,000.00 311,000.00 193,000.00

Baron

Patianrowo

Gondang

11.00 180,000.00 303,000.00 163,000.00 262,000.00 185,000.00 158,000.00 309,000.00 191,000.00

12.00 182,000.00 306,000.00 166,000.00 265,000.00 188,000.00 160,000.00 311,000.00 193,000.00

0

0

0 0

0 0

0 0

0 0

0 0 0

0 0 0

13.00 180,000.00 303,000.00 163,000.00 262,000.00 185,000.00 158,000.00 309,000.00 191,000.00

Rejoso 14 180,000.00 303,000.00 163,000.00 262,000.00 185,000.00 158,000.00 309,000.00 191,000.00

Lengkong 15 185,000.00 308,000.00 168,000.00 267,000.00 190,000.00 163,000.00 314,000.00 196,000.00

Jatikalen 16 185,000.00 308,000.00 168,000.00 267,000.00 190,000.00 163,000.00 314,000.00 196,000.00

0 0 0 0 0 0 0 0

Ngluyu 17 185,000.00 308,000.00 168,000.00 267,000.00 190,000.00 163,000.00 314,000.00 196,000.00

Pace 18 180,000.00 303,000.00 163,000.00 262,000.00 185,000.00 158,000.00 309,000.00 191,000.00

Tanjunganom 19 182,000.00 306,000.00 166,000.00 265,000.00 188,000.00 160,000.00 311,000.00 193,000.00

Prambon 20 182,000.00 306,000.00 166,000.00 265,000.00 188,000.00 160,000.00 311,000.00 193,000.00

NO. ANALISA A.2.2.1 A.2.2.1.1 A.2.2.1.2 A.2.2.1.3 A.2.2.1.4 A.2.2.1.5 A.2.2.1.6 A.2.2.1.7 A.2.2.1.8 A.2.2.1.9 A.2.2.1.10 A.2.2.1.11 A.2.2.1.12 A.2.2.1.13 A.2.2.1.14 A.2.2.1.15 A.2.2.1.16 A.2.3.1 A.2.3.1.1 A.2.3.1.2 A.2.3.1.3 A.2.3.1.4 A.2.3.1.5 A.2.3.1.6 A.2.3.1.7 A.2.3.1.8 A.2.3.1.9 A.2.3.1.10 A.2.3.1.11 A.2.3.1.12 A.2.3.1.13 A.2.3.1.14 A.3.2.1 A.3.2.1.1 A.3.2.1.2 A.3.2.1.3 A.3.2.1.4 A.3.2.1.5

A.3.2.1.6 A.3.2.1.7 A.3.2.1.8 A.3.2.1.9 A.3.2.1.10 A.3.2.1.11 A.4.1.1 A.4.1.1.1 A.4.1.1.2 A.4.1.1.3 A.4.1.1.4 A.4.1.1.5 A.4.1.1.6 A.4.1.1.7 A.4.1.1.8 A.4.1.1.9 A.4.1.1.10 A.4.1.1.11 A.4.1.1.12 A.4.1.1.13 A.4.1.1.14 A.4.1.1.15 A.4.1.1.16 A.4.1.1.17 A.4.1.1.18 A.4.1.1.19 A.4.1.1.20 A.4.1.1.21 A.4.1.1.22 A.4.1.1.23 A.4.1.1.24 A.4.1.1.25 A.4.1.1.26 A.4.1.1.27 A.4.1.1.35 A.4.1.1.36 A.4.1.2 A.4.1.2.1

A.4.1.2.2 A.4.1.2.3 A.4.1.2.4 A.4.1.2.5 A.4.1.2.6 A.4.1.2.7 A.4.1.2.8 A.4.1.2.9 A.4.1.2.10 A.4.1.2.11 A.4.1.2.12 A.4.1.2.13 A.4.1.2.14 A.4.1.2.15 A.4.1.2.16 A.4.1.2.17 A.4.1.2.18 A.4.1.2.19 A.4.1.2.20 A.4.1.2.21 A.4.1.2.22 A.4.1.2.23 A.4.1.2.24 A.4.2.1 A.4.2.1.1 A.4.2.1.2 A.4.2.1.3 A.4.2.1.4 A.4.2.1.5 A.4.2.1.6 A.4.2.1.7 A.4.2.1.8 A.4.2.1.9 A.4.2.1.10 A.4.2.1.11 A.4.2.1.12 A.4.2.1.13 A.4.2.1.14 A.4.2.1.15 A.4.2.1.16

A.4.2.1.17 A.4.2.1.18 A.4.2.1.19 A.4.2.1.20 A.4.2.1.21 A.4.2.1.22 A.4.2.1.23 A.4.4.1 A.4.4.1.1 A.4.4.1.2 A.4.4.1.3 A.4.4.1.4 A.4.4.1.5 A.4.4.1.6 A.4.4.1.7 A.4.4.1.8 A.4.4.1.9 A.4.4.1.10 A.4.4.1.11 A.4.4.1.12 A.4.4.1.13 A.4.4.1.14 A.4.4.1.15 A.4.4.1.16 A.4.4.1.17 A.4.4.1.18 A.4.4.1.19 A.4.4.1.20 A.4.4.1.21 A.4.4.1.22 A.4.4.1.23 A.4.4.1.24 A.4.4.1.25 A.4.4.1.26 A.4.4.2 A.4.4.2.1 A.4.4.2.2 A.4.4.2.3 A.4.4.2.4

A.4.4.2.5 A.4.4.2.6 A.4.4.2.7 A.4.4.2.8 A.4.4.2.9 A.4.4.2.10 A.4.4.2.11 A.4.4.2.12 A.4.4.2.13 A.4.4.2.14 A.4.4.2.15 A.4.4.2.16 A.4.4.2.17 A.4.4.2.18 A.4.4.2.19 A.4.4.2.20 A.4.4.2.21 A.4.4.2.22 A.4.4.2.23 A.4.4.2.24 A.4.4.2.25 A.4.4.2.26 A.4.4.2.27 A.4.4.2.28 A.4.4.2.29 A.4.4.3 A.4.4.3.1 A.4.4.3.2 A.4.4.3.2 A.4.4.3.3 A.4.4.3.4 A.4.4.3.5 A.4.4.3.6 A.4.4.3.7 A.4.4.3.8 A.4.4.3.9 A.4.4.3.10 A.4.4.3.11 A.4.4.3.12 A.4.4.3.13

A.4.4.3.14 A.4.4.3.15 A.4.4.3.16 A.4.4.3.17 A.4.4.3.18 A.4.4.3.19 A.4.4.3.20 A.4.4.3.21 A.4.4.3.22 A.4.4.3.23 A.4.4.3.24 A.4.4.3.25 A.4.4.3.26 A.4.4.3.27 A.4.4.3.28 A.4.4.3.29 A.4.4.3.30 A.4.4.3.31 A.4.4.3.32 A.4.4.3.33 A.4.4.3.34 A.4.4.3.35 A.4.4.3.36 A.4.4.3.37 A.4.4.3.38 A.4.4.3.39 A.4.4.3.40 A.4.4.3.41 A.4.4.3.42 A.4.4.3.43 A.4.4.3.44 A.4.4.3.45 A.4.4.3.46 A.4.4.3.47 A.4.4.3.48 A.4.4.3.49 A.4.4.3.50 A.4.4.3.51 A.4.4.3.52 A.4.4.3.53 A.4.4.3.54

A.4.4.3.55 A.4.4.3.56 A.4.4.3.57 A.4.4.3.58 A.4.4.3.59 A.4.4.3.60 A.4.4.3.61 A.4.4.3.62 A.4.4.3.63 A.4.4.3.64 A.4.4.3.65 A.4.4.3.66 A.4.4.3.67 A.4.5.1 A.4.5.1.1 A.4.5.1.2 A.4.5.1.3 A.4.5.1.4 A.4.5.1.5 A.4.5.1.6 A.4.5.1.7 A.4.5.1.8 A.4.5.1.9 A.4.5.2 A.4.5.2.1 A.4.5.2.2 A.4.5.2.3 A.4.5.2.4 A.4.5.2.5 A.4.5.2.6 A.4.5.2.7 A.4.5.2.8 A.4.5.2.9 A.4.5.2.10 A.4.5.2.11 A.4.5.2.12 A.4.5.2.13 A.4.5.2.14 A.4.5.2.15

A.4.5.2.16 A.4.5.2.17 A.4.5.2.18 A.4.5.2.19 A.4.5.2.20 A.4.5.2.21 A.4.5.2.22 A.4.5.2.23 A.4.5.2.24 A.4.5.2.25 A.4.5.2.26 A.4.5.2.27 A.4.5.2.28 A.4.5.2.29 A.4.5.2.30 A.4.5.2.31 A.4.5.2.32 A.4.5.2.33 A.4.5.2.34 A.4.5.2.35 A.4.5.2.36 A.4.5.2.37 A.4.5.2.38 A.4.5.2.39 A.4.5.2.40 A.4.5.2.41 A.4.5.2.42 A.4.5.2.43 A.4.6.1.1 A.4.6.1.1 A.4.6.1.2 A.4.6.1.3 A.4.6.1.4 A.4.6.1.5 A.4.6.1.6 A.4.6.1.7 A.4.6.1.8 A.4.6.1.9 A.4.6.1.10 A.4.6.1.11

A.4.6.1.12 A.4.6.1.13 A.4.6.1.14 A.4.6.1.15 A.4.6.1.16 A.4.6.1.18 A.4.6.1.19 A.4.6.1.20 A.4.6.1.21 A.4.6.1.22 A.4.6.1.23 A.4.6.1.24 A.4.6.1.25 A.4.6.1.26 A.4.6.1.27 A.4.6.1.28 A.4.6.2 A.4.6.2.1 A.4.6.2.2 A.4.6.2.3 A.4.6.2.4 A.4.6.2.5 A.4.6.2.6 A.4.6.2.7 A.4.6.2.8 A.4.6.2.9 A.4.6.2.10 A.4.6.2.11 A.4.6.2.12 A.4.6.2.13 A.4.6.2.14 A.4.6.2.15 A.4.6.2.16 A.4.6.2.17 A.4.6.2.18 A.4.6.2.19 A.4.6.2.20 A.4.6.2.21 A.4.6.2.22 A.4.6.2.23

A.4.7.1 A.4.7.1.1 A.4.7.1.2 A.4.7.1.3 A.4.7.1.4 A.4.7.1.5 A.4.7.1.6 A.4.7.1.7 A.4.7.1.8 A.4.7.1.9 A.4.7.1.10 A.4.7.1.11 A.4.7.1.12 A.4.7.1.13 A.4.7.1.14 A.4.7.1.15 A.4.7.1.16 A.4.7.1.17 A.4.7.1.18 A.4.7.1.19 A.4.7.1.20 A.4.7.1.21 A.4.7.1.22 A.5.1.1 A.5.1.1.1 A.5.1.1.2 A.5.1.1.3 A.5.1.1.4 A.5.1.1.5 A.5.1.1.6 A.5.1.1.7 A.5.1.1.8 A.5.1.1.9 A.5.1.1.10 A.5.1.1.11 A.5.1.1.12 A.5.1.1.13 A.5.1.1.14 A.5.1.1.15

A.5.1.1.16 A.5.1.1.17 A.5.1.1.18 A.5.1.1.19 A.5.1.1.20 A.5.1.1.21 A.5.1.1.22 A.5.1.1.23 A.5.1.1.24 A.5.1.1.25 A.5.1.1.26 A.5.1.1.27 A.5.1.1.28 A.5.1.1.29 A.5.1.1.30 A.5.1.1.31 A.5.1.1.32 A.5.1.1.33 A.5.1.1.34 A.5.1.1.35 A.5.1.1.36 A.8.4.6 A.8.4.6.1 A.8.4.6.2

KEGIATAN HARGA SATUAN PEKERJAAN PERSIAPAN (K3) Pembuatan 1 m² pagar sementara dari kayu tinggi 2 meter (K3) Pembuatan 1 m² pagar sementara dari seng gelombang tinggi 2 meter (K3) Pembuatan 1 m² pagar sementara dari kawat duri tinggi 1,8 meter Pengukuran dan Pemasangan 1 M' Bouwplank (K3) Pembuatan 1M² kantor sementara lantai plesteran (K3) Pembuatan 1M² rumah jaga (Konstruksi kayu) (K3) Pembuatan 1M² gudang semen dan peralatan (K3) Pembuatan 1M² bedeng pekerja (K3) Pembuatan 1M² lapangan dan perataan (K3) Pembuatan 1M² steger/perancah dari bambu Pembuatan 1 buah kotak adukan ukuran 40cm x 50cm x 25cm Pembuatan 1 M² jalan sementara Pembongkaran 1 M³ beton bertulang Pembongkaran 1 M³ dinding tembok bata Pemasangan 1 M² pagar kawat jaring galvanis panjang 240 cm Pemasangan 1 M² panel beton pracetak 5x50x213 cm HARGA SATUAN PEKERJAAN TANAH Penggalian 1 m³ tanah biasa sedalam 1 meter Penggalian 1 m³ tanah biasa sedalam 2 meter Penggalian 1 m³ tanah biasa sedalam 3 meter Penggalian 1 m³ tanah keras sedalam 1 meter Penggalian 1 m³ tanah cadas sedalam 1 meter Penggalian 1 m³ tanah Lumpur sedalam 1 meter Pengerjaan Stripping 1 m² tanah tebing setinggi 1 meter Pembuangan 1 m³ tanah sejauh 30 meter Pengurugan kembali 1 m³ galian tanah (K3) Pemadatan tanah 1 m³ tanah (per 20cm) Pengurugan 1 m³ dengan pasir urug Pemasangan 1 m³ lapisan pudel campuran 1KP:3PP:7TL Pemasangan 1 M² lapisan ijuk tebal 10cm untuk bidang resapan Pengurugan 1 M² sirtu padat HARGA SATUAN Pemasangan 1 m³ Pemasangan 1 m³ Pemasangan 1 m³ Pemasangan 1 m³ Pemasangan 1 m³

PEKERJAAN PONDASI pondasi batu belah campuran 1SP : 3 PP pondasi batu belah campuran 1SP : 4 PP pondasi batu belah campuran 1SP : 5 PP pondasi batu belah campuran 1SP : 6 PP pondasi batu belah campuran 1SP : 8 PP

Pemasangan 1 m³ pondasi batu belah campuran 1SP : 1 KP : 2 PP Pemasangan 1 m³ pondasi batu belah campuran 1SP : 3 KP : 10 PP Pemasangan 1 m³ pondasi batu belah campuran ¼SP : 1 KP : 4 PP (K3) Pemasangan 1 m³ batu kosong (anstamping) Pemasangan 1 m³ pondasi siklop, 60% beton campuran 1SP : 2 PB : 3Kr dan 40% batu belah Pemasangan 1 m³ pondasi sumuran, diameter 100 cm HARGA SATUAN PEKERJAAN BETON Membuat 1 M³ beton mutu f'с = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c =0,87 Membuat 1 M³ beton mutu f'с = 9,8 Mpa (K125), slump (12 ± 2) cm, w/c =0,78 Membuat 1 M³ beton mutu f'с = 12,2 Mpa (K150), slump (12 ± 2) cm, w/c =0,72 Membuat 1 M³ lantai kerja beton mutu f'с = 7,4 Mpa (K100), slump (3-6) cm, w/c =0,87 Membuat 1 M³ beton mutu f'с = 14,5 Mpa (K175), slump (12±2) cm, w/c =0,66 Membuat 1 M³ beton mutu f'с = 16,9 Mpa (K200), slump (12±2) cm, w/c =0,61 Membuat 1 M³ beton mutu f'с = 19,3 Mpa (K225), slump (12±2) cm, w/c =0,58 Membuat 1 M³ beton mutu f'с = 21,7 Mpa (K250), slump (12±2) cm, w/c =0,56 Membuat 1 M³ beton mutu f'с = 24,0 Mpa (K275), slump (12±2) cm, w/c =0,53 Membuat 1 M³ beton mutu f'с = 26,4 Mpa (K300), slump (12±2) cm, w/c =0,52 Membuat 1 M³ beton mutu f'с = 28,8 Mpa (K325), slump (12±2) cm, w/c =0,49 Membuat 1 M³ beton mutu f'с = 31,2 Mpa (K350), slump (12±2) cm, w/c =0,48 Membuat 1 M³ beton kedap air dengan strorox -100 Pemasangan 1 m' PVC Waterstop lebar 150 mm Pemasangan 1 m' PVC Waterstop lebar 200 mm Pemasangan 1 m' PVC Waterstop lebar 230 mm - 320 mm Pembesian 10 Kg dengan besi polos atau besi ulir Pembesian 1 Kg dengan besi polos atau besi ulir Pemasangan 10 Kg kabel prategang (prestressed) polos/strands Pemasangan 10 Kg jaring kawat baja (wiremesh) Pemasangan 1 M² bekisting untuk pondasi (K3) Pemasangan 1 M² bekisting untuk sloof (K3) Pemasangan 1 M² bekisting untuk kolom (K3) Pemasangan 1 M² bekisting untuk balok (K3) Pemasangan 1 M² bekisting untuk lantai (K3) Pemasangan 1 M² bekisting untuk dinding Pemasangan 1 M² bekisting untuk tangga Pemasangan 1 M² jembatan untuk pengecoran beton Membuat 1 M' kolom praktis beton bertulang (11 X 11) cm Membuat 1 M' ring balok beton bertulang (10 X 15) cm HARGA SATUAN BETON PRACETAK (K3) Membuat 1 M² lahan produksi 8 cm beton mutu f'с = 14,5 Mpa (K175), slump (12 ± 2) cm

(K3) Membuat 1 M² lahan produksi tebal 10 cm beton mutu f'с = 14,5 Mpa (K175), slump (12 ± 2) cm (K3) Membuat 1 M² lahan produksi tebal 12 cm beton mutu f'с = 14,5 Mpa (K175), slump (12 ± 2) cm (K3) Membuat 1 M² lahan produksi tebal 15 cm beton mutu f'с = 14,5 Mpa (K175), slump (12 ± 2) cm (K3) Pembuatan 1 M² bekesting untuk plat beton pracetak (5 kali pakai) Pembuatan 1 M² bekesting untuk balok beton pracetak (10-12 kali pakai) Pembuatan 1 M² bekesting untuk kolom beton pracetak (10-12 kali pakai) Pemasangan dan membuka bekesting 1 buah komponen plat beton pracetak Pemasangan dan membuka bekesting 1 buah komponen balok beton pracetak Pemasangan dan membuka bekesting 1 buah komponen kolom beton pracetak Penuangan / menebar untuk 1 buah komponen plat pracetak Penuangan / menebar beton untuk 1 buah komponen balok pracetak Penuangan / menebar beton untuk 1 buah komponen kolom pracetak Mendirikan 1 buah komponen plat pracetak Mendirikan 1 buah komponen balok pracetak Mendirikan 1 buah komponen kolom pracetak Mendirikan 1 buah komponen plat pracetak (± 20 m) Melangsir 1 buah komponen balok pracetak (± 20 m) Melangsir 1 buah komponen kolom pracetak (± 20 m) Bahan 1 M³ grouting campuran Bahan 1 M³ grouting tidak campuran Upah melakukan 1 titik grouting pada join pracetak Pemasangan 1 titik bekesting join pracetak Upah 1 titik Join dengan Sling HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM Pemasangan 1 Kg besi profil Pemasangan 1 Kg rangka kuda-kuda baja IWF Mengerjakan 100 Kg pekerjaan perakitan Pembuatan 1 M² pintu besi plat baja tebal 2 mm rangkap, rangka baja siku Pengerjaan 10 cm pengelasan dengan las listrik Pembuatan 1 M² rangka jendela besi scuare tube (25 X 5) cm Pemasangan 1 M² rangka pintu rolling door besi Pemasangan 1 M² pintu lipat ( folding door ) bahan plastik/ PVC Pemasangan 1 M² Sunscreen alluminium Pemasangan 1 M² rolling door aluminium Pemasangan 1 M Kusen pintu aluminium Pemasangan 1 M² pintu aluminium strip lebar 8 cm Pemasangan 1 M² kaca rangka aluminium Pemasangan 1 M² venetions dan Vertical blinde Pemasangan 1 M² terali besi strip (2x3) mm Pemasangan 1 M² kawat nyamuk

Pemasangan 1 M² jendela nako & tralis Pemasangan 1 M' talang datar / jurai bjls 28 lebar 90 cm Pemasangan 1 M talang ½ lingkaran D-15 cm seng plat bjls 30 lebar 45 cm Pemasangan 1 M² rangka besi hollow 1x40.40.2mm, modul 60x120 cm, dinding partisi Pemasangan 1 M² rangka besi hollow 1x40.40.2mm, modul 60x60 cm, plafon (K3) Pemasangan 1 M² atap pelana rangka atap baja canai dingin profil C75 (K3) Pemasangan 1 M² atap jurai rangka atap baja canai dingin profil C75 HARGA SATUAN PEKERJAAN PASANGAN DINDING Pemasangan 1M² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP Pemasangan 1M² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP Pemasangan 1M² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP Pemasangan 1M² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP Pemasangan 1M² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP Pemasangan 1M² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 KP : 10 PP Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 2 PP Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 3 PP Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 4 PP Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 5 PP Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 6 PP Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 8 PP Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 3 KP : 10 PP Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SM : 1 KP : 1 PP Pemasangan 1M² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SM : 1 KP : 2 PP Pemasangan 1M² dinding conblock HB20 campuran 1 SP : 3 PP Pemasangan 1M² dinding conblock HB20 campuran 1 SP : 4 PP Pemasangan 1M² dinding conblock HB15 campuran 1 SP : 3 PP Pemasangan 1M² dinding conblock HB15 campuran 1 SP : 4 PP Pemasangan 1M² dinding conblock HB10 campuran 1 SP : 3 PP Pemasangan 1M² dinding conblock HB10 campuran 1 SP : 4 PP Pemasangan 1M² dinding terawang(rooster) 12x11x24 campuran 1 SP : 3 PP Pemasangan 1M² dinding terawang(rooster) 12x11x24 campuran 1 SP : 4 PP Pemasangan 1M² dinding bata berongga ekspose12x11x24 campuran 1 SP : 3 PP Pemasangan 1M² dinding bata ringan tebal 7.5 cm dengan mortar siap pakai Pemasangan 1M² dinding bata ringan tebal 10 cm dengan mortar siap pakai HARGA SATUAN PEKERJAAN PLESTERAN Pemasangan 1M² plesteran campuran 1 SP : 1 PP : tebal 15 mm Pemasangan 1M² plesteran campuran 1 SP : 2 PP : tebal 15 mm Pemasangan 1M² plesteran campuran 1 SP : 3 PP : tebal 15 mm Pemasangan 1M² plesteran campuran 1 SP : 4 PP : tebal 15 mm

Pemasangan 1M² plesteran campuran 1 SP : 5 PP : tebal 15 mm Pemasangan 1M² plesteran campuran 1 SP : 6 PP : tebal 15 mm Pemasangan 1M² plesteran campuran 1 SP : 7 PP : tebal 15 mm Pemasangan 1M² plesteran campuran 1 SP : 7 PP : tebal 15 mm Pemasangan 1M² plesteran campuran 1 SP : ½ KP : 3 PP : tebal 15 mm Pemasangan 1M² plesteran campuran 1 SP : 2 KP : 8 PP : tebal 15 mm Pemasangan 1M² plesteran campuran 1 SM : 1 KP : 1 PP : tebal 15 mm Pemasangan 1M² plesteran campuran 1 SM : 1 KP : 2 PP : tebal 15 mm Pemasangan 1M² plesteran campuran 1 SP : 1 PP : tebal 20 mm Pemasangan 1M² plesteran campuran 1 SP : 3 PP : tebal 20 mm Pemasangan 1M² plesteran campuran 1 SP : 4 PP : tebal 20 mm Pemasangan 1M² plesteran campuran 1 SP : 5 PP : tebal 20 mm Pemasangan 1M² plesteran campuran 1 SP : 6 PP : tebal 20 mm Pemasangan 1M² plesteran campuran 1 SM : 1 KP : 2 PP tebal 20 mm Pemasangan 1M² berapen campuran 1 SP : 5 PP tebal 15 mm Pemasangan 1M² plesteran skoning campuran 1 SP : 3 PP lebar 10 cm Pemasangan 1M² plesteran granit campuran 1 SP : 2 granit tebal 1 cm Pemasangan 1M² plesteran traso 1 SP : 2 traso tebal 1 cm Pemasangan 1M² plesteran ciprat 1 SP : 2 PP Pemasangan 1M² finishing siar pasangan bata merah Pemasangan 1M² finishing siar pasangan conblock ekspose Pemasangan 1M² finishing siar pasangan batu kali, campuran 1 SP : 2 PP Pemasangan 1M² acian. Pemasangan 1M² plesteran dengan mortar siap pakai (MSP) Pemasangan 1M² plesteran dengan acian mortar siap pakai (MSP) HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Pemasangan 1M² lantai ubin PC abu-abu ukuran 40cm x 40cm. Pemasangan 1M² lantai ubin PC abu-abu ukuran 30cm x 30cm. Pemasangan 1M² lantai ubin PC abu-abu ukuran 30cm x 30cm. Pemasangan 1M² lantai ubin PC abu-abu ukuran 20cm x 20cm. Pemasangan 1M² lantai ubin warna ukuran 40cm x 40cm. Pemasangan 1M² lantai ubin warna ukuran 30cm x 30cm. Pemasangan 1M² lantai ubin warna ukuran 20cm x 20 cm. Pemasangan 1M² lantai ubin teraso ukuran 40 cm x 40 cm. Pemasangan 1M² lantai ubin teraso ukuran 30 cm x 30 cm. Pemasangan 1M² lantai ubin granit ukuran 40 cm x 40 cm. Pemasangan 1M² lantai ubin granit ukuran 30 cm x 30 cm. Pemasangan 1M² lantai ubin teralux marmer ukuran 40 cm x 40 cm. Pemasangan 1M² lantai ubin teralux marmer ukuran 30 cm x 30 cm. Pemasangan 1M² lantai ubin teralux marmer ukuran 60 cm x 60 cm.

Pemasangan 1M² lantai ubin teralux marmer ukuran 40 cm x 40 cm. Pemasangan 1M² lantai ubin teralux marmer ukuran 30 cm x 30 cm. Pemasangan 1M' plint ubin Pc abu abu ukuran 15 cm x 20 cm. Pemasangan 1M' plint ubin Pc abu abu ukuran 10 cm x 30 cm. Pemasangan 1M' plint ubin Pc abu abu ukuran 10 cm x 40 cm. Pemasangan 1M' plint ubin warna ukuran 10 cm x 20 cm. Pemasangan 1M' plint ubin warna ukuran 10 cm x 30 cm. Pemasangan 1M' plint ubin warna ukuran 10 cm x 40 cm. Pemasangan 1M' plint ubin teraso ukuran 10 cm x 30 cm. Pemasangan 1M' plint ubin teraso ukuran 10 cm x 40 cm. Pemasangan 1M' plint ubin granit ukuran 10 cm x 40 cm. Pemasangan 1M' plint ubin granit ukuran 10 cm x 30 cm. Pemasangan 1M' plint ubin teralux kerang ukuran 10 cm x 40 cm. Pemasangan 1M' plint ubin teralux kerang ukuran 10 cm x 30 cm. Pemasangan 1M' plint ubin teralux marmer ukuran 10 cm x 60 cm. Pemasangan 1M' plint ubin teralux marmer ukuran 10 cm x 40 cm. Pemasangan 1M' plint ubin teralux marmer ukuran 10 cm x 30 cm. Pemasangan 1M² lantai teraso cor di tempat, tebal 3 cm. Pemasangan 1M² lantai keramik artistik 10 cm x 20 cm. Pemasangan 1M² lantai keramik artistik 10 cm x 10 cm. atau 5 cm x 20 cm Pemasangan 1M² lantai keramik ukuran 33 cm x 33 cm Pemasangan 1M² lantai keramik ukuran 30 cm x 30 cm Pemasangan 1M² lantai keramik ukuran 20 cm x 20 cm Pemasangan 1M² lantai keramik ukuran 10 cm x 33 cm untuk variasi/border Pemasangan 1M² lantai keramik mozaik ukuran 30 cm x 30 cm. Pemasangan 1M' plint keramik ukuran 10 cm x 20 cm. Pemasangan 1M' plint keramik ukuran 10 cm x 10 cm. Pemasangan 1M' plint keramik ukuran 5 cm x 20 cm. Pemasangan 1M' plint internal cove artistik 5 cm x 5 cm x 20 cm. Pemasangan 1M² lantai marmer ukuran 100 cm x 100 cm . Pemasangan 1M² lantai karpet Pemasangan 1M² lantai underlayer (pelapis bawah karpet) Pemasangan 1M² lantai parquet kayu Pemasangan 1M² lantai kayu gymfloor Pemasangan 1M² dinding porslen 11 cm x 11 cm Pemasangan 1M² dinding porslen 10 cm x 20 cm Pemasangan 1M² dinding porslen 20 cm x 20 cm Pemasangan 1M² dinding keramik artistik 10 cm x 20 cm Pemasangan 1M² dinding keramik artistik 5 cm x 20 cm Pemasangan 1M² dinding keramik 10 cm x 20 cm Pemasangan 1M² dinding keramik 20 cm x 20 cm

Pemasangan 1M² dinding keramik marmer 100 cm x 100 cm Pemasangan 1M² dinding bata pelapis 3cm x 7cm x 24cm Pemasangan 1M² dinding bata paras Pemasangan 1M² dinding batu tempel hitam Pemasangan 1M² lantai vynil ukuran 30cm x 30cm Pemasangan 1M² walpaper lebar 50cm Pemasangan 1M² floor hardener Pemasangan 1M' plint vynil 15cm x 30cm Pemasangan 1M' plint kayu tebal 2cm lebar 10cm Pemasangan 1M2 paving block natural tebal 6 cm Pemasangan 1M2 paving block natural tebal 8 cm Pemasangan 1M2 paving block bewarna tebal 6 cm Pemasangan 1M2 paving block bewarna tebal 8 cm SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND) Pemasangan 1M2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm Pemasangan 1M² langit-langit akustik ukuran (30cm x 30cm) Pemasangan 1M² langit-langit akustik ukuran (30cm x 60cm) Pemasangan 1M² langit-langit akustik ukuran (60cm x 120cm) Pemasangan 1M² langit-langit triplek ukuran (120cm x 240cm) tebal 3mm, 4mm & 6mm Pemasangan 1M² langit-langit lambrisering kayu, tebal 9mm Pemasangan 1M² langit-langit gypsum board ukuran ( 120 x 240 x 9) mm, tebal 9mm Pemasangan 1M² langit-langit akustik ukuran (60 x 120) cm berikut kerangka aluminium Pemasangan 1M' list langit-langit kayu profil HARGA SATUAN PEKERJAAN PENUTUP ATAP Pemasangan 1M' atap genteng palentong kecil Pemasangan 1M2 Atap genteng kodok galzuur Pemasangan 1M2 atap genteng palentong besar / super Pemasangan 1M' bubung genteng palentong Pemasangan 1M' bubung genteng kodok glazuur Pemasangan 1M' bubung palentong besar Pemasangan 1M2 roof light fibreglass 90x180 Pemasangan 1M2 atap asbes gelombang 0.92m x 2.5m x 5mm Pemasangan 1M2 atap asbes gelombang 0.92m x 2.25m x 5mm Pemasangan 1M2 atap asbes gelombang 0.92m x 2.00m x 5mm Pemasangan 1M2 atap asbes gelombang 0.92m x 1.80m x 5mm Pemasangan 1M2 atap asbes gelombang 1.05m x 3.00m x 4mm Pemasangan 1M2 atap asbes gelombang 1.05m x 2.70m x 4mm Pemasangan 1M2 atap asbes gelombang 1.05m x 2.40m x 4mm Pemasangan 1M2 atap asbes gelombang 1.05m x 2.10m x 4mm

Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan

1M2 atap asbes gelombang 1.05m x 1.50m x 4mm 1M2 atap asbes gelombang 1.08m x 3.00m x 6mm 1M2 atap asbes gelombang 1.08m x 2.70m x 6mm 1M2 atap asbes gelombang 1.08m x 2.40m x 6mm 1M2 atap asbes gelombang 1.08m x 2.10m x 6mm 1M2 atap asbes gelombang 1.08m x 1.80m x 6mm 1M' bubung stel gelombang 0.92m 1M' bubung stel gelombang 1.05m 1M' bubung stel gelombang 1.08m 1M' Nok paten 0.92m 1M' Nok paten 1,05 m 1M' Nok paten 1,08 m 1M' Nok paten 0,92 m 1M' Nok stel rata 1,05 m 1 M2 genteng beton 1 M2 genteng aspal 1 M2 genteng metal ukuran 80x100 atap pelana 1 M2 genteng metal ukuran 80x100 atap jurai 1 M2 atap sirap kayu 1 M' nok genteng beton 1 M' nok genteng aspal 1 M' nok genteng metal 1 M' nok sirap 1 M' atap seng gelombang 1 M' nok atap seng 1 M' atap alumunium 1 M' nok alumunium 1 M2 alumunium foil/sisalation

HARGA SATUAN PEKERJAAN KAYU Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau kelas III Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas III Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau kelas II Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II Pembuatan 1 m2 daun pintu plywood rangkap rangka kayu kelas II tertutup (lebar sampai 90 cm) Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II Pembuatan 1 m2 jalusi kusen, kayu kelas I atau II Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I

Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II Pemasangan 1 m3 konstruksi kuda-kuda konvensional kayu kelas I, II dan III bentang 6 m Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I Pemasangan 1 m3 konstruksi gording, kayu kelas II Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II Pemasangan 1 m2 rangka atap sirap, kayu kelas II Pemasangan 1 m2 rangka langit-langit (50x100) cm, kayu kelas II atau III Pemasangan 1 m2 rangka langit-langit (60x60) cm, kayu kelas II atau III Pemasangan 1 m' lisplank ukuran (3x20) cm, kayu kelas I atau II Pemasangan 1 m' lisplank ukuran (3x30) cm, kayu kelas I atau II Pemasangan 1 m2 rangka dinding pemisah (60x120) cm, kayu kelas II atau III Pemasangan 1 m2 rangka dinding pemisah teakwood rangkap, rangka kayu kelas II Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120x240) cm Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV HARGA SATUAN PEKERJAAN KUNCI DAN KACA Pemasangan 1 buah kunci tanam antik Pemasangan 1 buah kunci tanam biasa Pemasangan 1 buah kunci kamar mandi Pemasangan 1 buah kunci silinder Pemasangan 1 buah engsel pintu Pemasangan 1 buah engsel jendela kupu-kupu Pemasangan 1 buah engsel angin Pemasangan 1 buah spring knip Pemasangan 1 buah kait angin Pemasangan 1 buah door closer Pemasangan 1 buah kunci slot Pemasangan 1 buah Door holder Pemasangan 1 buah Door stop Pemasangan 1 buah rel pintu sorong Pemasangan 1 buah kunci lemari Pemasangan 1 m2 kaca tebal 3 mm Pemasangan 1 m2 kaca tebal 5 mm Pemasangan 1 m2 kaca tebal 8 mm Pemasangan 1 m2 kaca buram tebal 12 mm Pemasangan 1 m2 kaca cermin tebal 5 mm Pemasangan 1 m2 kaca cermin tebal 8 mm Pemasangan 1 m2 kaca wireglassed tebal 5 mm Pemasangan 1 m2 kaca patri tebal 5 mm

HARGA SATUAN PEKERJAAN PENGECATAN 1 m2 Pengikisan/pengerokan permukaan cat lama 1 m2 Pencucian bidang permukaan tembok yang pernah dicat 1 m2 Pengerokan karat pada permukaan baja secara manual 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) Pelaburan 1 m2 bidang kayu dengan teak oil Pelaburan 1 m2 bidang kayu dengan politur Pelaburan 1 m2 bidang kayu dengan cat residu dan ter Pelaburan 1 m2 bidang kayu dengan vernis Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) Pelaburan 1 m2 tembok dengan kalkarium Pelaburan 1 m2 tembok dengan Kapur Pasang sirih Pelaburan 1 m2 tembok lama dengan Kapur Pasang sirih (pemeliharaan) Pemasangan 1 m2 wallpaper Pengecatan 1 m2 permukaan baja dengan meny besi Pengecatan 1 m2 permukaan baja dengan meny besi dengan perancah Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis cat Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir Plituran 10 m2 dengan plitur melamic HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG (K3) Pemasangan 1 buah closet duduk/monoblock Pemasangan 1 buah closet jongkok porselen Pemasangan 1 buah closet jongkok teraso (K3) Pemasangan 1 buah urinoir (K3) Pemasangan 1 buah wastafel (K3) Pemasangan 1 buah bathcuip porselen (K3) Pemasangan 1 buah bak fibreglass vol 1 m3 (K3) Pemasangan 1 buah bak mandi batu bata vol 0.30 m3 Pemasangan 1 buah bak mandi teraso vol 0.30 m3 Pemasangan 1 buah bak fibreglass vol 1 m3 (K3) Pemasangan 1 buah bak beton volume 1 m3 Pemasangan 1 buah bak cuci piring stainlessteel Pemasangan 1 buah bak cuci piring teraso Pemasangan 1 buah floor drain Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

Pemasangan 1 buah bak kontrol pasangan bata 45 cm x 45 cm tinggi 50 cm Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm Pemasangan 1 m' pipa galvanis diameter 1/2" Pemasangan 1 buah kran diameter 1/2" atau 3/4" Pemasangan 1 m' pipa galvanis diameter 3/4" Pemasangan 1 m' pipa galvanis diameter 1" Pemasangan 1 m' pipa galvanis diameter 1 1/2" Pemasangan 1 m' pipa galvanis diameter 3" Pemasangan 1 m' pipa galvanis diameter 4" Pemasangan 1 m' pipa PVC tipe AW diameter 1/2" Pemasangan 1 m' pipa PVC tipe AW diameter 3/4" Pemasangan 1 m' pipa PVC tipe AW diameter 1" Pemasangan 1 m' pipa PVC tipe AW diameter 1 1/2" Pemasangan 1 m' pipa PVC tipe AW diameter 2" Pemasangan 1 m' pipa PVC tipe AW diameter 2 1/2" Pemasangan 1 m' pipa PVC tipe AW diameter 3" Pemasangan 1 m' pipa PVC tipe AW diameter 4" Pemasangan 1 m' pipa air limbah jenis pipa tanah Ø 20 cm Pemasangan 1 m' pipa air limbah jenis pipa tanah Ø 15 cm Pemasangan 1 m' pipa beton Ø 15 - 20 cm Pemasangan 1 m' pipa beton Ø 30 - 100 cm HARGA SATUAN PEKERJAAN ELEKTRIKAL (K3) Pemasangan 1 buah titik lampu (K3) Pemasangan 1 buah MCB

NILAI (Rp) 831,119.95 750,182.95 763,442.45 827,541.27 #VALUE! Jendela naco 2,163,587.00 2,347,920.50 2,669,690.50 15,525.00 #VALUE! Tali ijuk 353,066.56 158,746.00 1,310,977.00 655,488.50 14,669.35 #VALUE! Panel beton pracetak

72,162.50 88,492.50 105,075.50 96,048.00 145,590.00 116,092.50 5,232.50 31,625.00 52,325.00 52,325.00 257,945.00 426,052.00 Kapur Pasang padam 15,697.50 Ijuk 285,602.50

898,684.75 857,997.75 829,759.50 809,922.00 782,695.75

588,736.35 Kapur Pasang 715,156.25 Kapur Pasang 698,268.50 455,172.30 2,422,219.70 937,259.20

916,048.92 947,851.36 972,801.42 850,507.96 1,002,210.21 1,030,524.03 1,051,486.88 1,065,734.57 1,090,420.13 1,098,006.86 1,179,665.88 1,189,690.61 1,201,232.50 #VALUE! #VALUE! #VALUE! 129,536.00 12,953.60 124,119.50 #VALUE! 346,278.80 378,382.78 562,668.55 581,643.55 677,668.55 #VALUE! 497,080.60 215,761.99 205,555.60 114,758.96

80,194.76

Strorox - 100 Waterstop lebar 150 mm Waterstop lebar 200 mm Waterstop lebar 230 mm - 320 mm

Jaring kawat baja dilas

Penjaga jarak bekisting / spacer

Koef Minyak Begisting Koef Minyak Begisting

100,257.82 111,011.63 150,398.23 #VALUE! #VALUE! #VALUE! 7,371.50 11,925.50 9,648.50 57,534.50 59,167.50 53,314.00 86,909.18 96,872.55 131,570.24 23,578.34 23,578.34 23,578.34 #VALUE! #VALUE! 51,175.00 115,931.50 46,931.50

30,547.45 30,547.45 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 615,825.00 110,465.55 #VALUE! 544,452.55 247,227.00 #VALUE! #VALUE!

Phenol film 12 mm Phenol film 12 mm Phenol film 12 mm

Sewa Crane Sewa Crane Sewa Crane Sewa Crane Sewa Crane Sewa Crane Semen grout Semen grout

Sewa alat Sewa alat Sewa alat Besi scuare tube Pintu gulung besi Pintu lipat Pintu lipat Profil Aluminium Aluminium strip

#VALUE! 203,410.50 85,834.85 #VALUE! #VALUE! #VALUE! 162,205.20

268,303.62 257,764.16 249,946.46 246,961.35 248,184.37 228,107.21 129,855.41 124,434.19 121,569.37 119,782.39 119,210.61 117,118.87 114,485.37 99,453.84 102,357.82 316,471.26 321,900.75 245,781.79 249,555.75 174,850.83 178,175.07 66,148.00 66,148.00 74,934.00 298,517.00 298,517.00

72,038.39 66,304.95 63,995.79 62,278.02

Rangka metal hollow 40.40.2 mm Rangka metal hollow 40.40.2 mm Baja ringan canai dingin C75 Baja ringan canai dingin C75

Kapur Pasang padam

Kapur Pasang padam

HB-20 HB-20 HB-15 HB-15 HB-10 HB-10 Bata rooster Bata berongga Bata rooster Cek harga mortar dan ketebalan harga bata ringan Cek harga mortar dan ketebalan harga bata ringan

61,497.03 60,790.51 60,463.22 60,135.93 60,743.23 59,242.25 52,262.67 54,019.41 88,761.18 85,682.31 83,290.36 82,350.62 81,307.02 74,371.42 38,244.03 58,486.12 83,409.50 Harga batu granit 83,409.50 48,514.36 27,586.95 13,135.30 58,752.69 35,444.43 0.00 0.00

65,694.90 65,958.25 65,958.25 69,601.45 144,239.90 135,820.75 139,245.45 77,654.90 81,195.75 230,029.90 81,195.75 77,654.90 81,195.75 77,552.55

Harga ubin abu-abu Harga ubin abu-abu Harga ubin abu-abu Harga ubin abu-abu

Harga ubin teraso Harga ubin teraso Harga ubin granit Harga ubin teralux Harga ubin teralux Harga ubin teralux

77,654.90 81,195.75 22,654.13 21,809.52 21,809.52 22,597.84 22,597.84 22,597.84 22,597.84 22,597.84 29,497.84 22,597.84 22,597.84 22,597.84 22,597.84 22,597.84 22,597.84 57,017.00 158,875.43 163,015.43 148,479.43 197,713.75 210,039.45 230,558.90 157,994.76 25,587.84 25,127.84 23,579.77 163,392.34 139,555.43 36,328.50 25,599.00 109,077.50 109,077.50 187,356.27 183,273.77 175,821.77 183,273.77 184,653.77 183,273.77 245,626.77

Harga ubin teralux Harga ubin teralux Harga plint ubin PC Harga plint ubin PC Harga plint ubin PC Harga plint ubin warna Harga plint ubin warna Harga plint ubin warna Harga plint ubin teraso Harga plint ubin teraso Harga plint ubin granit Harga plint teralux Harga plint teralux Harga plint teralux Harga plint teralux Harga plint teralux Harga teraso cor Harga keramik artistik Harga keramik Harga keramik

Harga keramik Harga keramik Harga plint keramik Harga plint keramik Harga interval cove Harga marmer Harga Karpet Harga underlayer Harga parquet Harga Kayu Gymfloor Harga porselen Harga porselen Harga porselen Harga keramik artistik Harga keramik artistik Harga keramik

237,778.37 205,124.12 135,215.56 287,015.56 32,062.00 52,520.50 25,599.00 17,066.00 112,792.00 169,300.70 192,915.95 95,901.95 118,901.95

42,318.85 27,548.25 27,548.25 23,281.75 50,533.30 267,361.77 41,155.05 106,662.50 10,918.10

75,187.00 339,744.50 51,094.50 99,889.00 195,339.00 172,339.00 22,448.00 29,336.50 29,336.50 83,156.50 96,801.25 58,805.25 28,577.50 24,796.30 24,796.30

Harga marmer Harga bata pelapis Harga bata paras Harga vynil Wallpaper floor hardener vynil

paving warna paving warna

Akustik Akustik Akustik tergantung tipe papan kayu Harga Bahan Harga list profil

Harga roof light Harga asbes Harga asbes

Harga asbes Harga asbes Harga asbes

24,796.30 24,796.30 24,796.30 24,796.30 24,796.30 24,796.30 22,666.50 22,666.50 22,666.50 22,666.50 22,666.50 22,666.50 26,726.00 22,666.50 101,305.80 51,060.00 30,026.50 30,026.50 45,034.00 211,001.77 41,952.00 42,837.50 53,797.00 92,572.70 31,539.90 101,384.00 130,525.00 20,562.00

Harga asbes Harga asbes Harga asbes Harga asbes Harga asbes Harga asbes Harga bubung Harga bubung Harga nok Harga nok Harga nok Harga nok Harga nok Harga nok Harga bahan Harga bahan Harga bahan Harga bahan Harga nok Harga nok Harga nok

Harga bahan Harga bahan Harga bahan

25,911,570.00 10,591,845.00 538,545.00 413,001.80 1,594,268.00 1,050,318.00 2,292,755.00 591,855.55 Plywood 1,098,585.80 Plywood 1,070,583.30 1,078,391.80 Teakwood

662,833.55 24,880,411.00 28,147,388.50 10,113,893.50 337,663.00 137,393.72 183,351.17 187,789.37 345,218.50 350,025.50 290,830.40 299,073.60 321,176.60 469,182.75 12,052.00 104,358.82

74,899.50 59,052.50 58,339.50 58,339.50 54,611.20 29,963.25 49,743.25 19,642.00 37,007.00 290,984.50 129,501.50 246,479.50 48,587.50 74,899.50 31,214.45 142,467.18 139,304.68 21,785.72 31,772.32 19,642.00 22,252.50 19,642.00 25,054.48

Teakwood Teakwood Plywood Bilik Bambu

Kunci tanam biasa Kunci tanam KM Kunci Silinder

Spring knip

Rel pintu sorong Kunci lemari

Kaca tebal 8 mm Kaca buram 12 mm Kaca cermin 5 mm Kaca cermin 8 mm Kaca wireglassed 5 mm Kaca patri 5 mm

14,179.50 15,042.00 15,674.50 48,967.00 64,262.00 17,825.00 70,767.55 17,204.00 42,946.75 19,782.30 15,272.00 7,785.50 14,702.75 5,514.25 28,100.25 29,442.30 56,405.43 62,624.40 32,582.95 140,859.59 124,499.00 1,668,420.00

Soda api

Kalkarium Kapur Pasang sirih Kapur Pasang sirih Wallpaper

2,274,410.20 484,920.50 287,005.50 224,273.00 Urinoir 687,603.40 93,529.50 Bathcuip 1,256,637.20 1,488,537.00 1,202,670.00 476,534.70 11,652,773.14 254,322.50 122,705.00 Bak cuci piring 155,652.50 451,927.00

672,019.75 814,335.70 40,123.50 79,148.75 47,431.75 45,471.00 52,658.50 39,238.00 39,238.00 22,764.25 22,586.00 25,259.75 15,697.50 51,704.00 23,483.00 81,057.75 111,182.00 65,491.35 16,306.54 94,437.94 184,897.00

Pipa galvanis 3" Pipa galvanis 4"

Pipa PVC AW 1 1/2" Pipa PVC AW 2 1/2"

Pipa tanah Pipa tanah dia 15

346,495.00 Las Dop 906,660.00

No

URAIAN BAHAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

Kawat duri Jendela naco Tali ijuk Panel beton pracetak 5 x 50 x 213 Kolom beton Strorox-100 Waterstop L= 150 mm Waterstop L= 200 mm Waterstop L= 230-320 mm Jaring kawat baja dilas Penjaga jarak begisting Besi hollow 50 x 50 x 3 Phenol film 12 m Dinabolt dia 12 mm (10-15cm) Sewa crane Sewa pipe support Semen grout Screening Besi scuare tube Besi lis kaca (1x1) cm Pintu rolling door besi Pintu lipat Profil kaca Venetion blinds dan vertical blinds (tirai) seng plat bjls 30 lebar 45 cm Kapur Pasang padam Conblock HB-20 Conblock HB-15 Conblock HB-10 Bata berongga Batu granit Batu traso Ubin abu-abu uk 40x40 Ubin abu-abu uk 30x30 Ubin abu-abu uk 20x20 Ubin teraso uk 40x40 Ubin teraso uk 30x30 Ubin granit uk 40x40 Ubin granit uk 30x30 Ubin granit uk 60x60 Ubin teralux marmer uk 40x40 Ubin teralux marmer uk 30x30 Ubin teralux marmer uk 60x60 Plint ubin Pc abu abu uk 15x20 Plint ubin Pc abu abu uk 10x30 Plint ubin Pc abu abu uk 10x40 Plint ubin warna uk 10x20 Plint ubin warna uk 10x30 Plint ubin warna uk 10x40 Plint ubin teraso uk 10x30

SATUAN M' Bh Bh Lbr Bt Kg M M M Kg Bh Kg Lbr Bh UH UH Kg Kg M M M2 M2 M M2

Buah Kg Kg Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah

HARGA (Rp) 4,300.00

51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93

Plint ubin teraso uk 10x40 Plint ubin granit uk 10x30 Plint ubin granit uk 10x40 Plint ubin teralux kerang 10x40 Plint ubin teralux kerang 10x30 Plint ubin teralux marmer 10x60 Plint ubin teralux marmer 10x40 Plint ubin teralux marmer 10x30 Teraso cor Keramik artistik 10x20 Keramik artistik 10x10 Keramik 33x33 Keramik 30x30 Keramik 20x20 Keramik 10 cm x 33 cm untuk variasi/border Keramik mozaik ukuran 30 cm x 30 cm Plint keramik ukuran 10 cm x 20 cm Plint keramik ukuran 10 cm x 10 cm Plint keramik ukuran 5 cm x 20 cm plint internal cove artistik 5 cm x 5 cm x 20 cm. marmer ukuran 100 cm x 100 cm Karpet Lem underlayer (pelapis bawah karpet) parquet kayu Kayu Gymfloor porslen 11 cm x 11 cm porslen 10 cm x 20 cm porslen 20 cm x 20 cm keramik artistik 10 cm x 20 cm keramik artistik 5 cm x 20 cm keramik 10 cm x 20 cm keramik 20 cm x 20 cm keramik marmer 100 cm x 100 cm bata pelapis 3cm x 7cm x 24cm bata paras batu tempel hitam vynil ukuran 30cm x 30cm walpaper lebar 50cm floor hardener plint vynil 15cm x 30cm langit-langit akustik ukuran (30cm x 30cm) langit-langit akustik ukuran (60cm x 120cm) Profil allum "T" Kawat dia 4mm Ramset Roof light 90x180 asbes gelombang 0.92m x 2.5m x 5mm asbes gelombang 0.92m x 2.25m x 5mm asbes gelombang 1.05m x 2.70m x 4mm asbes gelombang 1.05m x 3.00m x 4mm asbes gelombang 1.05m x 2.70m x 4mm asbes gelombang 1.05m x 2.40m x 4mm

Buah Buah Buah Buah Buah Buah Buah Buah M3 Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah M2 Kg M2 M2 M2 Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah kg Buah Lembar Lembar M Kg Bh Lembar Lembar Lembar Lembar Lembar Lembar Lembar

asbes gelombang 1.05m x 2.10m x 4mm asbes gelombang 1.05m x 1.50m x 4mm asbes gelombang 1.08m x 3.00m x 6mm asbes gelombang 1.08m x 2.70m x 6mm asbes gelombang 1.08m x 2.40m x 6mm asbes gelombang 1.08m x 2.10m x 6mm asbes gelombang 1.08m x 1.80m x 6mm bubung stel gelombang 0.92m paku skrup 3,5" bubung stel gelombang 1.05m bubung stel gelombang 1.08m

Lembar Lembar Lembar Lembar Lembar Lembar Lembar Lembar Bh Lembar Lembar

Nok paten 92 cm Nok paten 1,05 cm Nok stel rata 1,05 m Genteng aspal Plywood 6 mm Plastic aerator Genteng metal Sirap kayu Nok genteng beton Nok genteng aspal Kayu balok borneo Almn gel tbl 0,55 Paku hak panjang 15 cm Aluminum foil

Lembar

Plywood tebal 4 mm ukuran (90x220) cm Teakwood tebal 4 mm ukuran (90x220) cm Formika

Paku skrup 10 cm Bilik bambu List kayu 2/4 Door closer kunci silinder Door stop Rel pintu sorong

Kunci lemari Sealent kaca tebal 8 mm Kaca buram 12 mm

Kaca cermin 5 mm Kaca cermin 8 mm Kaca wireglassed 5 mm Kaca patri 5 mm Soda api Sabun Teak oil

Lembar Lembar Bh Lembar Bh Bh Bh Bh Bh M3 Lbr Kg M2 Lembar Lembar Lembar Kg M2 M3 Bh Bh Bh Set Set Kg M2 M2 M2 M2 M2 M2

Kg Kg Ltr

Kalkarium Kapur Pasang sirih

Alang-alang Wallpaper closet jongkok teraso Urinoir Bathcuip Porselen 11 x 11

Waterdrain bak cuci piring teraso Pipa galvanis 1/2" Pipa galvanis diameter 3/4" Pipa galvanis 1" Pipa galvanis 1 1/2" Pipa PVC AW 3/4" Pipa PVC AW 1 1/2" Pipa PVC AW 2 1/2" Pipa tanah Ø 20 cm Pipa tanah dia 15

MSP Bata ringan tebal 7.5 cm Bata ringan tebal 10 cm

Kg Kg Ikat M2 Bh Bh Bh Bh Bh Bh m m

Rencana Anggaran Biaya

No. Uraian pekerjaan No.    Uraian Pekerjaan    Satuan                                                                                                           (Rp)                   (Rp)                    (R                                              I Pendahuluan I    Pendahuluan                    1 Pembersihan lahan 1    Pembersihan Lahan        m2      2    Bowplak                        m          2 Bowplak                                                                                                                                                                                                                                                                                                     II Galian tanah /Urugan II    Galian / Urugan                    1    Galian Tanah Pondasi     m3       1 Galian tanah pondasi 2 Urugan Tanah 2    Urugan Tanah                m3                                                                                                                                                                                                                      III    Pondasi                    III Pondasi 1 Tongkat 1    Tongkat 70 cm          bh    33.00 2 2    Sepatu tongkat + pen    ls    1.00     900,000 2        Sepatu  900,000 tongkat     + pen    ls    1.0 3    Pasangan      11,340,000 batu padas        m3    2 1 3    Pasangan batu padas    m3    25.20     450,000                                                                               13,725,000                                          IV Beton IV    Beton                    1 1    Tongkat 12/12        m3    0.33     2,500,000     1    831,600 Tongkat     12/12        m3    0.33    2    Slof 12/12            m3    1.62     2,5 2 2    Slof 12/12        m3    1.62     2,500,000      4,050,000 3 3    Kolom 8/12        m3    0.91     2,500,000      2,268,000 3    Kolom 8/12            m3    0.91     2 4 4    Balak 8/12        m3    0.88     2,500,000      2,208,000 4    Balak 8/12            m3    0.88     2, 5 5    Kuda-kuda 8/12        m3    0.23     2,500,0005        Kuda-kuda  576,000    8/12        m3    0.23  6 6    Kanopi            m3    0.15     2,500,000      375,000 6    Kanopi                m3    0.15     2,50 7 7    Dak             m3    1.20     2,500,000      3,000,000 7    Dak               m3    1.20     2,500 8 8    Rabatan lantai        m3    3.15     700,000    8     2,205,000 Rabatan     lantai        m3    3.15                                                                                 15,513,600                                          V V    Dinding / Plesteran                    V    Dinding / Plesteran                    1    Pasangan      16,770,000 bata merah        m2    2 1 1    Pasangan bata merah    m2    258.00     65,000 2 2    Plesteran        m2    516.00     35,000      18,060,000 2    Plesteran            m2    516.00     3 3 3    Acian            m2    516.00     8,000            4,128,000 3    Acian                m2    516.00     8,0                                                                               38,958,000                                          VI VI    Kap / Atap                    VI    Kap / Atap                    1 1    Kuda-kuda meranti 5/10    m    0.75     3,200,000 1    Kuda-kuda      2,400,000 meranti     5/10    m     1,433,600 Kaso Meranti     5/7    m    0.45      2 2    Kaso Meranti 5/7    m    0.45     3,200,000    2    3 3    Reng meranti 3/5    m    0.70     3,200,000     3     2,236,800 Reng meranti     3/5    m    0.70    4 4    Sakura roof        m2    87.00     75,000      6,525,000 4    Sakura     roof        m2    87.00      5    Wall    flasing        m    26.00     5 5 5    Wall flasing        m    26.00     55,000      1,430,000 6 6    Nok Sakura roof        m    9.50     55,000      522,500 6    Nok Sakura     roof        m    9.50   7 7    Listplank Meranti    m    27.00     45,000      1,215,000 7    Listplank     Meranti    m    27.00                                                                                 15,762,900                                          VII VII    Plapon                    VII    Plapon                   

            VIII

            IX

            X

            XI

            XII

            XIII

1 1    Kerangka meranti 5/5    m    142.00     20,500 1       Kerangka  2,911,000 meranti     5/5    m    14      3,195,000 Nusaboarb    4mm        m2    71.0 2 2    Nusaboarb 4mm        m2    71.00     45,000 2    3 3    List plapon         m2    5.88     65,000      382,200 3    List    plapon         m2    5.88     6                                                                   6,488,200                                          VII    Kusen, pintu dan jendela                    VII    Kusen, pintu dan jendela        1 1    Kusen             m    82.30     65,000      5,349,500 1    Kusen                 m    82.30     65,0 2 2    Jendela            bh    6.00     425,000      2,550,000 2    Jendela                bh    6.00     425 3       Pintu  1,950,000 double    plywood    bh    3.0 3 3    Pintu double plywood    bh    3.00     650,000 4 4    Pintu luar 9mm        bh    2.00     750,000    4     1,500,000 Pintu luar   9mm        bh    2.00   5 5    Pintu Utama        bh    1.00     800,000      800,000 5    Pintu    Utama        bh    1.00     8 6    Pintu     WC        bh    1.00     700, 6 6    Pintu WC        bh    1.00     700,000      700,000                                                                   12,849,500                                          IX    Keramik                    IX    Keramik                     9,600,000 Lantai 30/30             m2    64.00   1 1    Lantai 30/30         m2    64.00     150,000    1    2 2    Dinding WC 20/25,20/20    m2    14.00     150,000 2    Dinding      2,100,000 WC 20/25,20/20        m2   3 3    Kitchen set 30/30    m2    6.00     2,000,0003         12,000,000 Kitchen set 30/30        m2    6.00                                                                     23,700,000                                          X    Plumbing                    X    Plumbing                    1 1    Gali Sepitang         m3    1.60     450,000     1     720,000 Gali Sepitang             m3    1.60    2 2    Gorong2 + pasang    bh    3.00     300,000     2     900,000 Gorong2   + pasang    bh    3.00  3     725,000 Tutup sepitang     lgkp    ls    1.00  3 3    Tutup sepitang lgkp    ls    1.00     725,000     4 4    Closed duduk lengkap    ls    1.00     2,550,000 4        Closed  2,550,000 duduk     lengkap    ls    1.0 5 5    Bak Mandi        ls    1.00     850,000      850,000 5    Bak     Mandi        ls    1.00     850 6 6    Floor drain 2" lgkp    bh    2.00     270,000    6     540,000 Floor drain     2" lgkp    bh    2.00  7 7    Kran air bersih 0,5"    bh    4.00     170,000 7         680,000 Kran air     bersih 0,5"    bh    4.00                                                                   6,965,000                                          XI    Pengecatan                    XI    Pengecatan                    1 1    Dinding luar        m2    220.00     12,500      2,750,000 1    Dinding    luar        m2    220.00   2 2    Dinding dalam        m2    190.00     9,500    2         Dinding 1,805,000 dalam            m2    190.0 3        Listplang        m2    9.80     25,0 3 3    Listplang        m2    9.80     25,000      245,000 4 4    Plapon            m2    94.00     9,500          893,000 4    Plapon                m2    94.00     9,5 5 5    Kusen            m2    18.54     30,000      556,116 5    Kusen                m2    18.54     30, 6        Jendela            m2    3.02     30, 6 6    Jendela            m2    3.02     30,000      90,600 7 7    Pintu            m2    21.20     30,000      636,000 7        Pintu            m2    21.20     30,0                                                                   6,975,716                                          XII    Listrik                    XII    Listrik                    1 1    Stop kontak biasa lgkp    ttk    7.00     250,000 1        Stop  1,750,000 kontak biasa     lgkp    ttk    7 2 2    Stop kontak TV        ttk    1.00     250,000    2     250,000 Stop kontak     TV        ttk    1.00    2,500,000 Titik lampu     lgkp    ttk    10.00    3 3    Titik lampu lgkp    ttk    10.00     250,000    3    4 4    Bok MCB 2 grop lgkp    bh    1.00     400,0004        Bok  400,000 MCB 2    grop lgkp    bh    1.0 5 5    Arde standart        bh    1.00     350,000      350,000 5    Arde     standart        bh    1.00                                                                        5,250,000                                          XIII    Halaman, taman, hiasan                    XIII    Halaman, taman, hiasan       

            XIV

                       

                       

                       

1 1    Taman rumput gajah mini    m2    20.00     80,000 1    Taman      1,600,000 rumput gajah     mini    m2     Pohon  250,000 palm     standart    bh    1.0 2 2    Pohon palm standart    bh    1.00     250,0002    3 3    Gorong2 parit        m    4.00     250,000      1,000,000 3    Gorong2     parit        m    4.00      4 4    Cor jembatan        m2    4.00     200,000     4     800,000 Cor jembatan            m2    4.00    5    Car     port        ls    18.00     65,00 5 5    Car port        ls    18.00     65,000      1,170,000 6 6    Ornamen            m2    5.00     250,000      1,250,000 6    Ornamen                m2    5.00     2                                                                   6,070,000                                          XIV    Lain-lain                    XIV    Lain-lain                    1 1    Kitchen set lgkp    ls    1.00     3,500,000     1     3,500,000 Kitchen     set lgkp    ls    1.00     3 2 2    Saluran Keliling    m    44.00     50,000      2,200,000 2    Saluran     Keliling    m    44.00      3    1,365,000 Benangan    pondasi    m2    27.3 3 3    Benangan pondasi    m2    27.30     50,000     4 4    Benangan Dinding    m    36.00     35,000    4     1,260,000 Benangan     Dinding    m    36.00 5 5    Benangan kanopi     ls    1.00     350,000     5     350,000 Benangan     kanopi     ls    1.00    6      Benangan  562,500     plapon Dak    m2    7 6 6    Benangan plapon Dak    m2    7.50     75,000                              9,237,500                     Jumlah                     173,170,416         Spasi 10 %                 17,317,042         Total                     190,487,458         Rp / m2                     3,023,610

Pekerjaan    Satuan    Volume    Harga Satuan     Jumlah Harga    Total Harga     (Rp)                    (Rp)

an                    han Lahan        m2         170.00     10,000          1,700,000                           m          170.00     15,000           2,550,000                                                                                                       4,250,000 rugan                    nah Pondasi     m3         3.60         150,000        540,000     nah                m3         76.50         90,000        6,885,000                                                                                                       7,425,000                 0 cm          bh    33.00     45,000      1,485,000     ngkat + pen    ls    1.00     900,000      900,000     batu padas    m3    25.20     450,000      11,340,000                        13,725,000                2/12        m3    0.33     2,500,000      831,600             m3    1.62     2,500,000      4,050,000     2        m3    0.91     2,500,000      2,268,000     2        m3    0.88     2,500,000      2,208,000     a 8/12        m3    0.23     2,500,000      576,000            m3    0.15     2,500,000      375,000         m3    1.20     2,500,000      3,000,000     antai        m3    3.15     700,000      2,205,000                        15,513,600 Plesteran                    bata merah    m2    258.00     65,000      16,770,000            m2    516.00     35,000      18,060,000         m2    516.00     8,000            4,128,000                        38,958,000 p                    a meranti 5/10    m    0.75     3,200,000      2,400,000     anti 5/7    m    0.45     3,200,000      1,433,600     anti 3/5    m    0.70     3,200,000      2,236,800     of        m2    87.00     75,000      6,525,000     g        m    26.00     55,000      1,430,000     ra roof        m    9.50     55,000      522,500     Meranti    m    27.00     45,000      1,215,000                        15,762,900                

meranti 5/5    m    142.00     20,500      2,911,000     b 4mm        m2    71.00     45,000      3,195,000     n         m2    5.88     65,000      382,200                        6,488,200 intu dan jendela                           m    82.30     65,000      5,349,500             bh    6.00     425,000      2,550,000     ble plywood    bh    3.00     650,000      1,950,000     9mm        bh    2.00     750,000      1,500,000     ma        bh    1.00     800,000      800,000            bh    1.00     700,000      700,000                        12,849,500                   30         m2    64.00     150,000      9,600,000     WC 20/25,20/20    m2    14.00     150,000      2,100,000     et 30/30    m2    6.00     2,000,000      12,000,000                        23,700,000                    ang         m3    1.60     450,000      720,000     + pasang    bh    3.00     300,000      900,000     itang lgkp    ls    1.00     725,000      725,000     duk lengkap    ls    1.00     2,550,000      2,550,000     i        ls    1.00     850,000      850,000     n 2" lgkp    bh    2.00     270,000      540,000     ersih 0,5"    bh    4.00     170,000      680,000                        6,965,000 an                    ar        m2    220.00     12,500      2,750,000     alam        m2    190.00     9,500          1,805,000            m2    9.80     25,000      245,000            m2    94.00     9,500          893,000           m2    18.54     30,000      556,116             m2    3.02     30,000      90,600         m2    21.20     30,000      636,000                        6,975,716                 ak biasa lgkp    ttk    7.00     250,000      1,750,000     ak TV        ttk    1.00     250,000      250,000     u lgkp    ttk    10.00     250,000      2,500,000     2 grop lgkp    bh    1.00     400,000      400,000     dart        bh    1.00     350,000      350,000                        5,250,000 n, taman, hiasan                   

mput gajah mini    m2    20.00     80,000      1,600,000     m standart    bh    1.00     250,000      250,000     parit        m    4.00     250,000      1,000,000     atan        m2    4.00     200,000      800,000         ls    18.00     65,000      1,170,000                m2    5.00     250,000      1,250,000                        6,070,000 n                    et lgkp    ls    1.00     3,500,000      3,500,000     eliling    m    44.00     50,000      2,200,000     pondasi    m2    27.30     50,000      1,365,000     Dinding    m    36.00     35,000      1,260,000     kanopi     ls    1.00     350,000      350,000     plapon Dak    m2    7.50     75,000      562,500    

Related Documents