PEMERINTAH KABUPATEN TRENGGALEK

DAFTAR ANALISA HARGA SATUAN UPAH DAN BAHAN TAHUN 2017

DATARAN RENDAH DAN TINGGI ( NON PPN )

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN TRENGGALEK

DAFTAR HARGA SATUAN UPAH DAN BAHAN DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PEMERINTAH KABUPATEN TRENGGALEK Tahun Anggaran 2017 UPAH KERJA

PROPINSI KABUPATEN TAHUN

KABUPATEN TRENGGALEK No 1 I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

JENIS KEGIATAN PERORANGAN 2 UPAH Tukang Batu/Kayu/Besi/Aspal/Cat Kepala Tukang Pekerja / Buruh tak terampil Mandor Penjaga Buruh terampil Buruh semi terampil Opertor Loader/excavator Operator terampil Operator semi terampil Pembantu operator Sopir Terampil Sopir Pribadi Mekanik Terampil Mekanik Semi Terampil Pembantu sopir Juru Ukur Memakai Pesawat Juru Ukur

Satuan 3 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr

BESAR UPAH ( Rp ) RENDAH 4 85,000.00 87,500.00 70,000.00 90,000.00 70,000.00 80,000.00 75,000.00 200,000.00 150,000.00 100,000.00 75,000.00 87,000.00 81,000.00 90,000.00 81,000.00 75,000.00 400,000.00 120,000.00

DAFTAR HARGA BAHAN BANGUNAN

PROPINSI KABUPATEN TAHUN

KABUPATEN TRENGGALEK No

URAIAN BAHAN

SATUAN

1

2

3

II 1 2 3 4 5 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

BAHAN Air di angkut sejauh 3 km Agregat halus 0,2 - 0.5 cm Alat-alat bantu *) Angker Bolt ( 20 kg ) Akustirk Baja konstruksi/profil Baja Sling D. 14 mm Baja Sling D. 32 mm Baja tralis Bambu Bronjong Bambu Bongkotan Bambu Ori Bambu Ori P ; 4 m Bambu Apus/Tali Batang Kelapa Bataco Batu belah 7 - 10 cm Batu belah 10 - 15 / 10 - 20 cm Batu belah 15 - 25 cm Batu belah / Batu Gebal Batu belah / batu kali Batu bobos MD. Palimanan Batu Bobos MD. Suruh Batu Gunung (quarry) Batu Kali Quari Batu Merah Batu Muka Batu pecah 0,2-1 cm (pecah mesin) Batu pecah 1-2 cm Batu pecah 1-2 cm (pecah mesin) Batu pecah 2-3 cm Batu pecah 2-3 cm (pecah mesin) Batu pecah 3-5 cm Batu pecah 3-5 cm (pecah mesin) Batu pecah 5-7 cm Batu pecah 7-10 cm Batu quarry pecah tersaring Batu quarry-royalti Baut baja/Begel Bensin/Premium (sewaktu-waktu ada perubahan harga mengikuti harga yang berlaku/harga perubahan tersebut) Besi galvanis d. 2"

HARGA SATUAN (NON PPN) ( Rp ) RENDAH 4

M³ M³ set set lbr kg m1 m1 kg Bt Bt Bt Bt Bt Bt Bh M³ M³ M³ M³ M³ M³ M³ M³ M³ Bji M2 M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ kg Ltr

82,900.00 348,000.00 157,400.00 93,300.00 281,900.00 17,600.00 39,100.00 196,100.00 14,400.00 18,900.00 21,400.00 21,400.00 21,400.00 17,000.00 664,100.00 4,200.00 253,500.00 253,500.00 253,500.00 253,500.00 253,500.00 241,500.00 241,500.00 253,500.00 253,500.00 1,040.00 36,200.00 348,000.00 353,800.00 380,300.00 304,500.00 354,600.00 284,500.00 310,800.00 253,500.00 253,500.00 257,900.00 218,200.00 18,100.00 6,800.00

m1

90,600.00

DAFTAR HARGA BAHAN BANGUNAN

PROPINSI KABUPATEN TAHUN

KABUPATEN TRENGGALEK No

URAIAN BAHAN

SATUAN

1

2

3

II 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75

BAHAN Besi galvanis d. 3" Besi Kanal C 10/UNP Besi Siku Besi Plat Besi Plat Strip Besi Bulat ST 60 Begisting Plat Baja Buis Beton Dia 15 - 20 cm Buis Beton 1/2 Dia 15 - 20 cm Buis Beton 1/2 Dia 30 cm Buis Beton Dia 100 ( 50 cm ) Buis Beton Dia 30 Buis Beton Dia 40 - 100 cm Buis Beton Dia 50 ( 50 cm ) Buis Beton Dia 60 ( 50 cm ) Buis Beton Dia 80 ( 50 cm ) Cat tembok Cat jembatan/Emco Cat Marka Jalan (Thermo Plastic) Cat Marka Cat Meny Cat Putih Seng Bron Cat Genteng Cat kayu Cat meny Kayu Cat meny besi Cetok Check Valve dia. 1'' Dolken kayu dan sejenis d. 15 - 20 cm P. 2 m' Dolken kayu jati lokal d. 15 - 20 cm P. 2 m'

m1 kg kg kg kg kg kg M' M' M' M' M' M' M' M' M' kg kg M² kg kg kg kg kg kg kg bh bh Bt Bt

HARGA SATUAN (NON PPN) ( Rp ) RENDAH 4

144,400.00 20,800.00 20,800.00 20,800.00 20,800.00 20,500.00 31,600.00 48,300.00 24,100.00 36,200.00 241,500.00 72,400.00 84,500.00 60,300.00 78,400.00 99,600.00 23,200.00 81,000.00 138,800.00 73,500.00 30,100.00 60,300.00 58,500.00 68,800.00 30,100.00 38,800.00 24,600.00 135,800.00 69,300.00 110,200.00

DAFTAR HARGA BAHAN BANGUNAN

PROPINSI KABUPATEN TAHUN

KABUPATEN TRENGGALEK No

URAIAN BAHAN

SATUAN

1

2

3

II 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117

BAHAN Elektroda baja RB Gemuk/Stemvet Genteng beton Genteng Bubung beton Genteng bubung kodok Genteng Bubung Glazzur Genteng Glazzur Genteng kaca Genteng kodok Genteng pres Genting maantili Grendel pintu (alfa) Grendel pintu panjang (sespan) Grosok brantas Grosok lokal Grosok Tulungagung Gembok Gypsum board ( 1.2 x 2.4 cm ) Ijuk Kapur Sirih Kasut Kayu Kawat Baja / bendrat Kawat Bronjong Kawat duri Kawat galvanis 4 mm ( BWG 8 ) Kawat Harmonika Kawat Burung Kawat kasa Kawat nyamuk Kayu Acuan Kayu bakar Keramik Arstiktik Uk. 10 Cm x 15-40 Cm Kertas gosok (rempelas) Kotak Adukan Klem penjepit seling ø 12 mm Klem penjepit seling ø 8 mm Klingker Kloset duduk Kloset duduk keramik ( monoblok ) setara Toto Kloset jongkok keramik warna muda ( monoblok ) setara INA Kloset jongkok keramik warna tua( monoblok ) setara INA Kloset jongkok teraso

kg kg bh Bh bh bh bh bh bh bh bh bh bh M³ M³ M³ Bh Lbr kg M³ bh kg kg kg kg M² M² M² M² M³ M³ M² Lbr Bh M' M' bh bh bh bh bh bh

HARGA SATUAN (NON PPN) ( Rp ) RENDAH 4

40,600.00 42,200.00 8,400.00 12,000.00 7,200.00 30,100.00 15,300.00 14,100.00 3,800.00 4,400.00 4,800.00 18,100.00 54,300.00 246,900.00 56,700.00 246,900.00 91,500.00 87,400.00 28,300.00 530,400.00 14,400.00 16,900.00 18,000.00 17,400.00 18,000.00 27,000.00 17,200.00 21,500.00 15,000.00 5,140,800.00 422,600.00 78,400.00 3,600.00 55,100.00 36,200.00 9,600.00 505,900.00 784,800.00 2,716,800.00 173,900.00 179,000.00 48,300.00

DAFTAR HARGA BAHAN BANGUNAN

PROPINSI KABUPATEN TAHUN

KABUPATEN TRENGGALEK No

URAIAN BAHAN

SATUAN

1

2

3

II 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156

BAHAN Kolom beton pracetak (0,15 x 0,20 x 2,50) Kran Dia 1/2 Kran Dia 3/4 Kuas eterna 2" - 5" Kunci pembengkok tulangan Kusen aluminium putih Kusen aluminium coklat Lampu Mercury 50 - 200 watt Lampu LED 9 watt setara phillip Lampu taman besar Lampu taman kecil Lampu TI 2 x 20 watt Lampu Hemat Energi 20 watt setara phillip Lem PVC Lem (kayu + tembok) Lim vinyl List Eternit List gypsum besar List gypsum kecil List Profil kecil List Profil besar Magnet Pintu Marmer Hitam Marmer Putih Meteran Minyak Aspal Minyak Bakar(sewaktu-waktu ada perubahan harga mengikuti harga yang berlaku/harga perubahan tersebut) Minyak Cat ( Thinner A ) Minyak cat ( Thinner B ) Minyak Diesel/Solar (sewaktu-waktu ada perubahan harga mengikuti harga yang berlaku/harga perubahan tersebut) Minyak flux Minyak Pelumas Minyak Tanah (sewaktu-waktu ada perubahan harga mengikuti harga yang berlaku/harga perubahan tersebut) Mesin Diesel 20 PK Molen Multiplek 6 mm Multiplek 9 mm Multiplek 10 mm Mur Baut 1/2", 5/8", 7/8"

Btg bh bh bh bh m' m' bh bh bh bh bh bh kg kg kg M' m' m' M' M' bh M² M² Bh. Ltr Ltr Ltr Ltr Ltr Ltr Ltr Ltr Unit Unit Lbr Lbr Lbr kg

HARGA SATUAN (NON PPN) ( Rp ) RENDAH 4

370,700.00 36,600.00 41,800.00 18,000.00 25,600.00 108,600.00 114,700.00 455,700.00 80,800.00 210,700.00 179,600.00 251,600.00 59,700.00 8,200.00 14,400.00 50,700.00 4,800.00 15,000.00 9,600.00 9,600.00 18,100.00 28,600.00 381,900.00 327,400.00 28,100.00 14,700.00 13,700.00 33,000.00 28,500.00 6,100.00 11,700.00 31,300.00 15,100.00 4,226,200.00 13,433,300.00 92,700.00 137,600.00 175,000.00 36,200.00

DAFTAR HARGA BAHAN BANGUNAN

PROPINSI KABUPATEN TAHUN

KABUPATEN TRENGGALEK No

URAIAN BAHAN

SATUAN

1

2

3

II 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198

BAHAN Naco (kerangka dan daun) Oli Gardan Ongkos pasang stop kontak + instalasi Ongkos pasang titik lampu + instalasi Ongkos kerja konstruksi Ongkos kerja mesin Ongkos kerja kayu Paku jembatan Paku seng (Paku payung) Paku Usuk/reng Paku asbes Paku eternit / triplek Paku kait Paku sekrup Paku sumbat Paku keling 3/4', 5/8', 7/8' Panel beton pracetak (L 0,50 P 2.13. T 0,05) Papan Kayu Balau Papan Kayu Kamper Papan Kayu Kruing Papan Kayu Meranti Papan Kayu Tahun (Mauni/Mindi/Segon Tekik/Akasia) Papan Kayu JATI Papan Kayu Bauwplank / Begisting Pasir ayak beton (Brantas) Pasir Brantas (beton) Pasir Brantas Pasir Lokal Pasir urug Paving Stone Warna NON KONTRUKSI Paving Stone Polos NON KONTRUKSI Paving Stone Warna K 175 Paving Stone Polos K 175 Paving Stone Warna K 225 Paving Stone Polos K 225 Penangkal Petir Pintu dan Kusen PVC Pion Beton Pintu aluminium 1 CM COKLAT Pintu besi baja 3mm Pintu besi gantung Pintu besi gulung

M² ltr Titik Titik kg kg M³ kg Kg kg kg kg bh bh bh kg Lbr M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ bh bh bh bh bh bh bh Set bh M² M² M² M²

HARGA SATUAN (NON PPN) ( Rp ) RENDAH 4

49,200.00 39,500.00 175,000.00 175,000.00 11,800.00 24,900.00 1,040,400.00 22,000.00 25,300.00 13,800.00 25,300.00 19,500.00 25,700.00 930.00 1,500.00 34,100.00 215,000.00 16,180,000.00 15,395,000.00 10,263,000.00 8,150,000.00 7,848,000.00 19,687,000.00 2,415,000.00 276,400.00 276,400.00 276,400.00 120,700.00 120,700.00 1,600.00 1,500.00 1,600.00 1,500.00 1,900.00 1,800.00 108,600.00 452,700.00 21,900.00 543,300.00 1,147,100.00 1,212,900.00 519,100.00

DAFTAR HARGA BAHAN BANGUNAN

PROPINSI KABUPATEN TAHUN

KABUPATEN TRENGGALEK No

URAIAN BAHAN

SATUAN

1

2

3

II 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240

BAHAN Pintu besi lipat 0,6 MM Pintu + kusen PVC Pipa kurasan Pipa besi Dia. 5/8 mm ( Listrik ) Pipa Almunium Dia. 3/8 mm Pipa PVC Tpe C Dia 3/4 " Pipa PVC Tpe C Dia 1 " Pipa PVC Tpe C Dia 1.5 " Pipa PVC Tpe C Dia 2 " Pipa PVC Tpe C Dia 2.5 " Pipa PVC Tpe C Dia 3 " Pipa PVC Tpe C Dia 4 " Pipa PVC 1.5 " (sejenis naga sakti) Pipa PVC 2 " (sejenis naga sakti) Pipa Pengecatan pintu kayu Plamur kayu Plamur tembok Poli Karbonat (Rangka Besi) Poli Karbonat (Rangka Stenlis) Politur Politur jadi Pompa Sanchin type SC 45 Pompa Sanchin type SC 120 Pompa Groundfos JP Daya Dorong:40m,Daya Hisap: 11m Pompa Air DAB Pompa Air National / Smizhu Rel pintu dorong Residu (ter) Roling door aluminium Rangka atap ROOF TRUS Slang Miliard 5/8' Slang Miliard 3/4' Slang Waterpas Sealent Seal tape Scakelar ganda Scakelar tunggal Skrup Fixer Semen abu-abu / PC (50 kg/zak) Semen abu-abu / PC (40 kg/zak) Semen abu-abu / PC

M² Set bh m' m' m' m' m' m' m' m' m' m' m' kg M² kg kg M² M² Ltr Ltr Unit Unit Unit Bh Bh Bh Lti M² M² m m m tube bh bh bh bh Zak Zak kg

HARGA SATUAN (NON PPN) ( Rp ) RENDAH 4

1,186,500.00 452,700.00 25,200.00 2,600.00 15,400.00 4,700.00 6,700.00 9,000.00 12,400.00 15,700.00 17,300.00 23,100.00 8,800.00 10,000.00 18,900.00 127,500.00 26,700.00 6,400.00 452,800.00 573,500.00 80,800.00 84,300.00 4,226,200.00 4,497,800.00 7,333,600.00 664,100.00 694,200.00 269,700.00 21,200.00 868,400.00 629,300.00 3,600.00 4,500.00 2,700.00 15,000.00 3,100.00 19,000.00 15,300.00 5,400.00 69,300.00 55,400.00 1,386.00

DAFTAR HARGA BAHAN BANGUNAN

PROPINSI KABUPATEN TAHUN

KABUPATEN TRENGGALEK No

URAIAN BAHAN

SATUAN

1

2

3

II 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282

BAHAN Semen Merah Semen Putih/ Warna (40 kg/zak ) Seng Gelombang BJLS 20 x 3 m Seng Gelombang BJLS 25 x 3 m Seng Gelombang BJLS 30 x 3 m Seng Talang BJLS 30 x 60 cm Seng Talang BJLS 30 x 90 cm Seling D. 32 mm Seling D. 16 mm Seling D. 14 mm Seling D. 12 mm Seling D. 10 mm Seling D. 8 mm Septictangk dan Rembesan 6 m³ Sirlag Sirtu lokal/urug Slot (kunci-kunci pintu) lokal 2x Putar Sock Drat D 3/4" Solar Stempet gemuk Water Drain Tanah liat Tanah Urug Pilihan Tandon air 1000 ltr Tandon air 550 ltr Tanah urug Timbunan biasa Timbunan pilihan Arde Asbes datar Uk. 50.200.04 Asbes gelombang besar Uk. 305 x 105 x 0,4 Cm Asbes gelombang kecil Uk. 1.80 x 80 x 0.4 Cm Avoor /KM Stainlees Avoor / Bak Mandi Stainless Baja profil Besi Kanal C Besi Siku Bak cuci tangan stenlis Bak cuci tangan wastafel Bak kip Bak mandi fiber glaas Bak mandi teraso

M³ Zak Lbr Lbr Lbr Lbr Lbr m' m' m' m' m' m' bh kg M³ bh bh Ltr kg bh M³ M³ bh bh M³ M³ M³ bh Lbr Lbr Lbr Bh Bh kg kg kg bh bh bh bh bh

HARGA SATUAN (NON PPN) ( Rp ) RENDAH 4

225,900.00 112,100.00 86,900.00 107,400.00 117,000.00 26,600.00 41,200.00 191,900.00 47,000.00 42,200.00 35,000.00 22,900.00 18,100.00 6,234,300.00 301,800.00 126,000.00 295,700.00 2,900.00 6,100.00 42,200.00 95,400.00 69,300.00 76,800.00 1,903,000.00 1,164,000.00 60,300.00 73,500.00 78,700.00 57,100.00 42,600.00 104,800.00 42,900.00 61,300.00 48,300.00 17,600.00 20,800.00 20,800.00 229,400.00 431,600.00 4,029,200.00 470,900.00 741,300.00

DAFTAR HARGA BAHAN BANGUNAN

PROPINSI KABUPATEN TAHUN

KABUPATEN TRENGGALEK No

URAIAN BAHAN

SATUAN

1

2

3

II 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324

BAHAN Balok Kayu Balau Balok Kayu Jati Lokal Balok Kayu Kamper Balok Kayu Kruing Balok Kayu Meranti Balok Kayu Tahun (Mauni/Mindi/Segon/Tekik/Akasia) Besi Beton Polos f 8 mm-12 mm,panj.12m Besi beugel/baut Biaya Penyambungan Daya 1300 WATT Biaya Penyambungan Daya 2200 WATT Biaya Penyambungan Daya 900 WATT Bubung asbes gel besar ( ardek 1 stel 2 lbr ) Bubung asbes gel kecil ( ardek 1 stel 2 lbr ) Daun jendela aluminium (0.6x1.1) lengkap Daun pintu aluminium kaca 5 mm (engsel biasa) lengkap Daun pintu aluminium kaca 5 mm (engsel swing) lengkap Dempul kayu Engsel cendela ( H ) Engsel cendela (Arch) Engsel pintu ( H ) Engsel pintu (Arch) Eternit (asbes) Formika Hak angin Handel Jendela Jendela besi Jendela naco Kabel NBC 6 mm Kabel Tuesty Kaca bening Uk. 3 mm Kaca bening Uk. 5 mm Kaca ray-band Uk. 5mm Kaca Cermin Kapur Pasang Kapur Sirih Karet Reng Standart dia. 2'' Karet Reng Standart dia. 3'' Karet Reng Standart dia. 4'' Karet Reng Standart dia. 6'' Talang karet 60 cm Talang karet 80 cm Teak oil

M³ M³ M³ M³ M³ M³ kg kg Unit Unit Unit Stel Stel bh bh bh kg bh bh bh bh M² Lbr Stel Bh M² M² kg kg M² M² M² M² M³ M³ bh bh bh bh m' m' ltr

HARGA SATUAN (NON PPN) ( Rp ) RENDAH 4

15,286,000.00 19,018,000.00 15,093,000.00 9,780,000.00 7,969,000.00 7,486,000.00 12,100.00 19,900.00 3,018,700.00 4,226,200.00 2,415,000.00 87,400.00 33,100.00 905,600.00 3,018,700.00 4,226,200.00 42,200.00 7,700.00 21,500.00 20,800.00 45,800.00 15,800.00 386,800.00 16,900.00 6,400.00 802,700.00 272,300.00 171,300.00 171,300.00 138,800.00 196,100.00 226,300.00 150,900.00 761,000.00 530,400.00 18,600.00 25,900.00 37,200.00 46,600.00 15,500.00 20,400.00 10,700.00

DAFTAR HARGA BAHAN BANGUNAN

PROPINSI KABUPATEN TAHUN

KABUPATEN TRENGGALEK No

URAIAN BAHAN

SATUAN

1

2

3

II 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366

BAHAN Tegel Keramik Lantai Polos Tegel Keramik Lantai Warna Muda Tegel Keramik Lantai Warna Tua Tegel Keramik Dinding Polos Tegel Keramik Dinding Warna Tekwood Tekwood dilapis aluminium Tempat sabun Triplek 3 mm Triplek 4 mm Teralis besi plat/siku Ubin Abu-abu Uk. 20 Cm x 20 Cm Ubin Teraso Uk. 30 Cm x 30 Cm Ubin Wafel Uk. 20 Cm x 20 Cm Vernis Zekering kast lokal 1 goup Zekering kast lokal 2 goup Zekering kast lokal 4 goup Pipa Galvanis Dia 1" Pipa Galvanis Dia 1.5" Pipa Galvanis Dia 1/2" Pipa Galvanis Dia 10" Pipa Galvanis Dia 12" Pipa Galvanis Dia 2" Pipa Galvanis Dia 3" Pipa Galvanis Dia 3/4" Pipa Galvanis Dia 4" Pipa Galvanis Dia 6" Pipa Galvanis Dia 8" Pipa PVC AW Dia 1" Pipa PVC AW Dia 1,5" Pipa PVC AW Dia 1/2" Pipa PVC AW Dia 10" Pipa PVC AW Dia 12" Pipa PVC AW Dia 2" Pipa PVC AW Dia 3" Pipa PVC AW Dia 3/4" Pipa PVC AW Dia 4" Pipa PVC AW Dia 6" Profil Kaca Daun Pintu/Jendela Alumunium/ Fillent Profil Alumunium Daun Pintu 10 cm Profil Alumunium Daun Jendela 6 cm

M² m2 m2 m2 m2 Lbr Lbr bh Lbr Lbr M² M² M² M² Ltr bh bh bh M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M'

HARGA SATUAN (NON PPN) ( Rp ) RENDAH 4

48,000.00 56,500.00 63,700.00 62,800.00 66,000.00 126,700.00 118,300.00 36,200.00 61,300.00 81,400.00 845,200.00 51,700.00 62,400.00 70,300.00 66,400.00 84,500.00 150,800.00 241,500.00 48,100.00 64,500.00 30,100.00 1,215,500.00 1,339,900.00 90,600.00 144,400.00 38,100.00 233,800.00 672,100.00 1,034,100.00 11,400.00 21,100.00 6,600.00 443,700.00 633,900.00 33,100.00 60,000.00 8,800.00 74,800.00 167,500.00 6,000.00 271,900.00 210,100.00

DAFTAR HARGA BAHAN BANGUNAN

PROPINSI KABUPATEN TAHUN

KABUPATEN TRENGGALEK No

URAIAN BAHAN

SATUAN

1

2

3

II 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 394 395 396 397 398 399 400 401 402 403 404 405

BAHAN Kaca Hias/Patri Door Holder Rangka Plafond Hollow Rangka Atap Galvalum Atap Galvalum C-75, 0.8 C-75, 0.55 Reng 0.43 Baut (screw driver) Dynabolt Talang jurai Soda api Stoper / Topi uskup t=6cm (K 175) Stoper / Topi uskup t=6cm (K 225) Kanstin Trap uk. 15.25.40 (me) Roster Beton Gergaji Gergaji besi Gunting pemotong baja Sewa kereta dorong Kereta dorong Sewa molen Palu Ember Vibrator Kantong Plastik Karung Plastik Bodem Bronjong Pabrikasi 2x1x0,5 (2,7mm) Bronjong Pabrikasi 2x1x0,5 (3,0mm) Gedek / Sesek Langit-langit PVC biasa Langit-langit PVC Bertingkat Besi Kanal C 10, 4 Besi Kanal C 10, 3 Roster Merah

HARGA SATUAN (NON PPN) ( Rp ) RENDAH 4

M² 573,500.00 bh 301,800.00 M² 181,100.00 M² 175,000.002011 TRENGGALEK, 2011 TRENGGALEK, M² 60,300.00 KEPALADINAS DINASPERUMAHAN PERUMAHAN PERMUKIMAN KEPALA PERMUKIMAN m' KEBERSIHAN 21,000.00 DAN DAN KEBERSIHAN m' 18,700.00 KABUPATEN KABUPATEN TRENGGALEK TRENGGALEK m' 10,300.00 bh 500.00 bh 5,100.00 m' 30,100.00 Ir. Ir.MOKHAMAD MOKHAMADSISWANTO, SISWANTO,SH, SH,MM MM kg 55,300.00 NIP. NIP.19590406 19590406198403 198403 11010 010 bh 5,500.00 bh 6,300.00 16,800.00 bh bh 24,100.00 bh 69,400.00 bh 16,900.00 bh 543,300.00 hari 100,400.00 bh 557,400.00 hari 120,700.00 bh 33,900.00 bh 11,800.00 jam 144,600.00 bh 10,800.00 bh 10,800.00 bh 146,500.00 bh 245,300.00 bh 302,700.00 bh 63,000.00 M² 271,600.00 M² 332,000.00 m' 73,400.00 m' 59,900.00 bh 9,000.00

TRENGGALEK, PEBRUARI 2017 KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN TRENGGALEK

DAFTAR HARGA BAHAN BANGUNAN

PROPINSI KABUPATEN TAHUN

KABUPATEN TRENGGALEK No

URAIAN BAHAN

SATUAN

1

2

3

II

HARGA SATUAN (NON PPN) ( Rp ) RENDAH 4

BAHAN

Ir. JANU RIANTO, MT NIP. 19580131 199011 1 001

DAN BAHAN ATAAN RUANG

GGALEK

PROPINSI KABUPATEN TAHUN

JAWA TIMUR TRENGGALEK 2017

BESAR UPAH ( Rp ) TINGGI 5 85,000.00 87,500.00 70,000.00 90,000.00 70,000.00 80,000.00 75,000.00 200,000.00 150,000.00 100,000.00 75,000.00 87,000.00 81,000.00 90,000.00 81,000.00 75,000.00 400,000.00 120,000.00

KETERANGAN 6

PROPINSI KABUPATEN TAHUN

JAWA TIMUR TRENGGALEK 2017

ARGA SATUAN (NON PPN) ( Rp ) TINGGI 5

113,100.00 356,100.00 165,450.00 93,300.00 284,700.00 18,400.00 39,800.00 199,200.00 15,000.00 18,900.00 21,400.00 21,400.00 30,100.00 17,000.00 664,100.00 4,200.00 288,700.00 288,700.00 288,700.00 288,700.00 288,700.00 241,500.00 241,500.00 288,700.00 288,700.00 1,260.00 42,200.00 348,900.00 343,900.00 381,500.00 315,000.00 367,000.00 309,700.00 338,100.00 288,700.00 288,700.00 264,600.00 231,000.00 20,500.00 7,900.00 90,600.00

Keterangan

6

6,000.00

PROPINSI KABUPATEN TAHUN

JAWA TIMUR TRENGGALEK 2017

ARGA SATUAN (NON PPN) ( Rp ) TINGGI 5

144,400.00 20,800.00 20,800.00 20,800.00 20,800.00 20,500.00 32,500.00 54,200.00 30,100.00 42,200.00 241,500.00 78,400.00 90,500.00 66,300.00 90,500.00 114,600.00 25,000.00 82,900.00 190,300.00 74,800.00 35,000.00 78,400.00 59,100.00 69,400.00 35,000.00 46,600.00 25,600.00 141,200.00 70,500.00 111,500.00

Keterangan

6

PROPINSI KABUPATEN TAHUN

JAWA TIMUR TRENGGALEK 2017

ARGA SATUAN (NON PPN) ( Rp ) TINGGI 5

42,000.00 44,600.00 9,000.00 12,600.00 7,800.00 30,700.00 15,600.00 18,700.00 4,100.00 4,700.00 5,100.00 24,100.00 60,300.00 252,000.00 59,200.00 252,000.00 91,500.00 96,600.00 22,600.00 536,700.00 14,400.00 17,600.00 22,500.00 29,500.00 24,600.00 34,300.00 21,700.00 21,700.00 21,700.00 5,166,000.00 392,400.00 90,500.00 3,800.00 56,700.00 37,400.00 10,800.00 603,700.00 805,900.00 2,747,000.00 178,700.00 185,900.00 60,300.00

Keterangan

6

PROPINSI KABUPATEN TAHUN

JAWA TIMUR TRENGGALEK 2017

ARGA SATUAN (NON PPN) ( Rp ) TINGGI 5

389,200.00 37,400.00 50,500.00 19,200.00 28,300.00 114,700.00 120,700.00 478,500.00 80,800.00 221,500.00 188,700.00 264,200.00 59,700.00 9,400.00 14,700.00 50,700.00 4,800.00 15,000.00 10,800.00 9,600.00 18,100.00 36,200.00 401,300.00 343,700.00 34,600.00 14,900.00 13,900.00 37,000.00 28,900.00 6,100.00 11,900.00 43,000.00 15,200.00 4,830,000.00 15,093,700.00 93,500.00 138,800.00 186,000.00 38,900.00

Keterangan

6

PROPINSI KABUPATEN TAHUN

JAWA TIMUR TRENGGALEK 2017

ARGA SATUAN (NON PPN) ( Rp ) TINGGI 5

51,700.00 41,400.00 175,000.00 175,000.00 11,800.00 24,900.00 1,040,400.00 23,300.00 27,000.00 19,000.00 27,000.00 26,500.00 26,900.00 950.00 1,700.00 37,800.00 225,700.00 16,301,000.00 15,395,000.00 11,169,000.00 9,660,000.00 7,245,000.00 19,687,000.00 3,984,700.00 344,000.00 344,000.00 344,000.00 120,700.00 150,800.00 1,900.00 1,800.00 1,900.00 1,800.00 2,100.00 2,000.00 114,600.00 467,800.00 23,300.00 543,300.00 1,207,500.00 1,285,800.00 550,200.00

Keterangan

6

2,100,000.00

PROPINSI KABUPATEN TAHUN

JAWA TIMUR TRENGGALEK 2017

ARGA SATUAN (NON PPN) ( Rp ) TINGGI 5

1,257,500.00 467,800.00 26,700.00 2,800.00 16,500.00 6,200.00 7,200.00 9,200.00 12,600.00 15,900.00 17,800.00 23,600.00 9,500.00 10,900.00 18,900.00 134,600.00 32,600.00 9,600.00 458,800.00 579,600.00 82,100.00 86,600.00 4,226,200.00 4,769,600.00 7,773,500.00 664,100.00 706,300.00 286,000.00 22,500.00 920,700.00 667,100.00 3,600.00 4,800.00 2,700.00 15,000.00 3,600.00 22,400.00 17,600.00 5,900.00 71,400.00 57,100.00 1,428.00

Keterangan

6

PROPINSI KABUPATEN TAHUN

JAWA TIMUR TRENGGALEK 2017

ARGA SATUAN (NON PPN) ( Rp ) TINGGI 5

239,500.00 118,700.00 93,100.00 116,100.00 139,400.00 27,700.00 41,500.00 193,200.00 48,300.00 43,400.00 36,200.00 24,100.00 19,300.00 6,626,800.00 301,800.00 126,000.00 301,800.00 3,600.00 6,100.00 44,600.00 101,200.00 75,600.00 81,900.00 1,969,600.00 1,192,300.00 84,500.00 78,700.00 85,300.00 60,600.00 45,300.00 105,700.00 46,400.00 62,300.00 50,700.00 18,400.00 i 20,800.00 20,800.00 232,300.00 452,700.00 4,271,100.00 499,200.00 785,800.00

Keterangan

6

PROPINSI KABUPATEN TAHUN

JAWA TIMUR TRENGGALEK 2017

ARGA SATUAN (NON PPN) ( Rp ) TINGGI 5

15,347,000.00 19,018,000.00 15,093,000.00 10,263,000.00 8,603,000.00 7,094,000.00 12,200.00 21,700.00 3,018,700.00 4,226,200.00 2,415,000.00 96,600.00 34,100.00 966,000.00 3,139,500.00 4,347,000.00 42,200.00 7,900.00 21,500.00 21,100.00 47,100.00 17,900.00 410,000.00 18,200.00 10,000.00 850,900.00 288,900.00 181,600.00 181,600.00 142,800.00 197,700.00 239,900.00 150,800.00 806,600.00 537,900.00 19,800.00 27,700.00 39,600.00 49,500.00 15,800.00 22,300.00 11,500.00

Keterangan

6

0

PROPINSI KABUPATEN TAHUN

JAWA TIMUR TRENGGALEK 2017

ARGA SATUAN (NON PPN) ( Rp ) TINGGI 5

53,800.00 62,300.00 64,800.00 63,400.00 70,400.00 134,400.00 120,700.00 36,200.00 62,300.00 83,200.00 863,300.00 54,800.00 66,400.00 74,700.00 66,400.00 84,500.00 150,900.00 241,500.00 48,100.00 64,500.00 30,100.00 1,288,500.00 1,420,500.00 90,600.00 144,400.00 38,100.00 247,900.00 712,400.00 1,096,200.00 11,600.00 21,300.00 7,000.00 443,700.00 633,900.00 33,300.00 60,700.00 9,200.00 79,500.00 176,400.00 6,600.00 288,700.00 222,800.00

Keterangan

6

PROPINSI KABUPATEN TAHUN

JAWA TIMUR TRENGGALEK 2017

ARGA SATUAN (NON PPN) ( Rp ) TINGGI 5

579,600.00 316,800.00 193,200.00 2011 187,100.00 2011 AHANPERMUKIMAN PERMUKIMAN 72,400.00 AHAN 22,300.00 RSIHAN RSIHAN 19,900.00 RENGGALEK ENGGALEK 11,000.00 600.00 5,500.00 30,100.00 WANTO, WANTO,SH, SH,MM MM 58,800.00 198403 98403 11010 010 6,000.00 6,800.00 17,800.00 26,500.00 83,200.00 17,000.00 543,300.00 105,000.00 567,500.00 150,800.00 37,400.00 11,900.00 148,000.00 11,100.00 11,100.00 155,400.00 246,300.00 303,600.00 57,700.00 283,700.00 344,100.00 85,500.00 72,000.00 10,100.00

K, PEBRUARI 2017 AS PEKERJAAN UMUM ENATAAN RUANG TEN TRENGGALEK

Keterangan

6

PROPINSI KABUPATEN TAHUN

JAWA TIMUR TRENGGALEK 2017

ARGA SATUAN (NON PPN) ( Rp ) TINGGI

NU RIANTO, MT 80131 199011 1 001

5

Keterangan

6

1

STANDAR NASIONAL INDONESIA BANGUNAN GEDUNG DAN PERUMAHAN ANALISA BIAYA KONSTRUKSI ( ABK ) TH 2017 KABUPATEN TRENGGALEK PEKERJAAN PERSIAPAN

Dataran Rendah Koefisien

Analisa

Uraian

1 6.1

Sat

Volume

2

3

Harga

Jumlah Harga

Jumlah

Satuan

Upah

Bahan

(Rp.)

(Rp.)

(Rp.)

(Rp.)

4

5

6

7

1 M' PAGAR SEMENTARA DARI KAYU TINGGI 2 M TENAGA Tukang Kayu

0.200

Oh

85,000.00

Kepala Tukang

0.020

Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.400

Oh

70,000.00

28,000.00

Mandor

0.020

Oh

90,000.00

1,800.00

BAHAN Dolken kayu dan sejenis d. 15 - 20 cm P

1.250 Btng

69,300.00

86,625.00

Semen abu-abu / PC

2.500

Pasir Brantas (beton)

0.005

Kg

1,386.00

3,465.00



276,400.00

Koral Beton Split 1 - 2 cm

1,382.00

0.009



353,800.00

3,184.20

Kayu 5 / 7

0.072



7,486,000.00

538,992.00

Residu

0.400

Lt

21,200.00

8,480.00

0.060

Kg

13,800.00

Paku Usuk

Jumlah 6.2

828.00 48,550.00

642,956.20

691,506.20

1 M' PAGAR SEMENTARA DARI SENG GELOMBANG TENAGA Tukang Kayu

0.200

Oh

85,000.00

17,000.00

Kepala Tukang

0.020

Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.400

Oh

70,000.00

28,000.00

Mandor

0.020

Oh

90,000.00

1,800.00

BAHAN Dolken Kayu Jati ø 8 - 10 x 4 m

1.250 Btng

69,300.00

86,625.00

Semen abu-abu / PC

2.500

Kg

1,386.00

3,465.00

Pasir Brantas (beton)

0.005



276,400.00

1,382.00

Koral Beton Split 1 - 2 cm

0.009



353,800.00

3,184.20

Seng Gelombang Bjls 28

1.200

Lbr

86,900.00

104,280.00

Kayu 5/7 ( Tahun )

0.072



7,486,000.00

538,992.00

Meny Besi

0.450

Kg

38,800.00

17,460.00

Paku Usuk

0.060

Kg

13,800.00

828.00

Jumlah 6.3

48,550.00

756,216.20

1 M' PAGAR SEMENTARA DARI KAWAT DURI TENAGA Tukang Kayu

0.200

Oh

85,000.00

17,000.00

Kepala Tukang

0.020

Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.020

Oh

90,000.00

1,800.00

BAHAN Dolken Kayu Jati ø 8 - 10 x 4 m

1.000 Btng

69,300.00

69,300.00

Semen abu-abu / PC

2.000

Kg

1,386.00

2,772.00

Pasir Brantas (beton)

0.005



276,400.00

1,382.00

Koral Beton Split 1 - 2 cm

0.009



353,800.00

3,184.20

Kawat Duri

25.000

Kg

17,400.00

435,000.00

Paku Usuk

0.060

Kg

13,800.00

828.00

804,766.20

2 1

2

3

4

Jumlah 6.4

5

6

41,550.00

7

512,466.20

554,016.20

1 M' PENGUKURAN DAN PEMASANGAN BOWPLANK TENAGA Tukang Kayu

0.100

Oh

85,000.00

8,500.00

Kepala Tukang

0.010

Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100

Oh

70,000.00

7,000.00

Mandor

0.005

Oh

90,000.00

450.00

Usuk Kayu Bouplank

0.012



7,486,000.00

89,832.00

Papan

0.007



7,848,000.00

54,936.00

0.020

Kg

13,800.00

BAHAN

Paku Usuk

Jumlah

276.00 16,825.00

145,044.00

161,869.00

3 1 6.5

2

3

4

Tukang Kayu

2.000

Oh

85,000.00

170,000.00

Tukang batu

1.000

Oh

85,000.00

85,000.00

Kepala Tukang

0.300

Oh

87,500.00

26,250.00

Pekerja/Buruh tak terampil

2.000

Oh

70,000.00

140,000.00

Mandor BAHAN

0.050

Oh

90,000.00

4,500.00

Dolken Kayu Jati ø 8 - 10 x 4 m

69,300.00

86,625.00

Kg

1,386.00

48,510.00

Pasir Lokal

0.150



120,700.00

18,105.00

Pasir Brantas (beton)

0.100



276,400.00

27,640.00

Koral Beton Split 1 - 2 cm

0.150



353,800.00

53,070.00

Seng Gelombang Bjls 28

0.750

Lbr

86,900.00

65,175.00

Kayu 5/7

0.180



7,486,000.00

1,347,480.00

Bata Merah

1.250 Btng

30.000

Bh

1,040.00

31,200.00

Bingkai Nako

0.200



272,300.00

54,460.00

Kaca Polos

0.080



196,100.00

15,688.00

Kunci tanam

0.150

Bh

295,700.00

44,355.00

Triplek 4 mm

0.060

Lbr

81,400.00

4,884.00

Paku Usuk

0.850

Kg

13,800.00

11,730.00

Jumlah

425,750.00

Tukang Kayu

2.000

Oh

85,000.00

170,000.00

Kepala Tukang

0.200

Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor BAHAN

0.050

Oh

90,000.00

4,500.00

69,300.00

117,810.00

10.500

Kg

1,386.00

14,553.00

Pasir Brantas (beton)

0.030



276,400.00

8,292.00

Koral Beton Split 1 - 2 cm

0.050



353,800.00

17,690.00

Seng Gelombang Bjls 28

1.500

Lbr

86,900.00

130,350.00

Kayu 5/7

0.210



7,486,000.00

1,572,060.00

Paku Usuk

0.300

Kg

13,800.00

2,234,672.00

1.700 Btng

4,140.00 262,000.00

1,864,895.00

2,126,895.00

1 M² PEMBUATAN PEMBUATAN RUMAH JAGA / KONSTRUKSI KAYU TENAGA Tukang Kayu

1.500

Oh

85,000.00

127,500.00

Kepala Tukang

0.150

Oh

87,500.00

13,125.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor BAHAN

0.050

Oh

90,000.00

4,500.00

Dolken Kayu Jati ø 8 - 10 x 4 m

3.000 Btng

Seng Gelombang Bjls 28

1.500

Lbr

86,900.00

130,350.00

Kayu 5/7 ( Tahun )

0.276



7,486,000.00

2,066,136.00

0.700

Kg

13,800.00

Paku Usuk

69,300.00

Jumlah

207,900.00

9,660.00 215,125.00

2,414,046.00

2,629,171.00

1 M² PEMBERSIHAN LAPANGAN DAN PERATAAN TENAGA Pekerja/Buruh tak terampil

0.100

Oh

70,000.00

Mandor

0.050

Oh

90,000.00

Jumlah 6.9

1,808,922.00

Semen abu-abu / PC

Jumlah

6.8

7

1 M² PEMBUATAN GUDANG SEMEN DAN ALAT - ALAT TENAGA

Dolken Kayu Jati ø 8 - 10 x 4 m

6.7

6

35.000

Semen abu-abu / PC

6.6

5

1 M² PEMBUATAN KANTOR SEMENTARA DGN LANTAI PLESTERAN TENAGA

1 M² PEMBUATAN BEDENG PEKERJA / BURUH TENAGA

7,000.00 4,500.00 11,500.00

11,500.00

4 1

2

3

4

5

Tukang Kayu

2.000

Oh

85,000.00

170,000.00

Kepala Tukang

0.200

Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

6

7

BAHAN Dolken Kayu Jati ø 8 - 10 x 4 m

69,300.00

86,625.00

Semen abu-abu / PC

18.000

1.250 Btng Kg

1,386.00

24,948.00

Pasir Brantas (beton)

0.030



276,400.00

8,292.00

Koral Beton Split 1 - 2 cm

0.050



353,800.00

17,690.00

Seng Gelombang Bjls 32

1.500

Lbr

117,000.00

175,500.00

Kayu 5/7

0.186



7,486,000.00

1,392,396.00

Triplek 4 mm

1.350

Lbr

81,400.00

109,890.00

Paku Usuk

0.300

Kg

13,800.00

Jumlah

4,140.00 262,000.00

1,819,481.00

2,081,481.00

5 1 6.10

2

3

4

5

6

7

1 M² PEMBUATAN BAK ADUKAN ( 40 X 50 X 20 ) CM TENAGA Tukang Kayu

0.300

Oh

85,000.00

25,500.00

0.0015

Oh

90,000.00

135.00

Papan Kayu Biasa

0.030



7,848,000.00

235,440.00

Kayu 5/7

0.001



7,486,000.00

7,486.00

Paku Usuk

0.080

Kg

13,800.00

Mandor BAHAN

Jumlah 6.12

1,104.00 25,635.00

244,030.00

269,665.00

1 M² PEMBUATAN JALAN SEMENTARA TEBAL 15 CM TENAGA Pekerja/Buruh tak terampil

0.100

Oh

70,000.00

7,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

Batu belah 15/20 cm

0.150



253,500.00

38,025.00

Batu pecah 5 - 7 cm

0.090



253,500.00

22,815.00

Pasir Urug

0.010



120,700.00

BAHAN

Jumlah 6.13

1,207.00 11,500.00

62,047.00

73,547.00

1 M³ PEMBONGKARAN BETON BERTULANG TENAGA Pekerja/Buruh tak terampil Mandor

6.667

Oh

70,000.00

0.333

Oh

90,000.00

Jumlah 6.14

466,690.00 29,970.00

496,660.00

496,660.00

1 M³ PEMBONGKARAN DINDING TEMBOK BATA MERAH TENAGA Pekerja/Buruh tak terampil Mandor

6.667

Oh

70,000.00

0.033

Oh

90,000.00

Jumlah 6.15

466,690.00 2,970.00

469,660.00

469,660.00

1 M² PAS. PAGAR KAWAT JARING GALVANIS TINGGI 1 M TENAGA Tukang Kayu

0.042

Oh

85,000.00

3,570.00

Kepala Tukang

0.004

Oh

87,500.00

350.00

Pekerja/Buruh tak terampil

0.042

Oh

70,000.00

2,940.00

Mandor

0.002

Oh

90,000.00

180.00

1.100

M2

15,000.00

BAHAN Kawat Ram ( Jaring )

Jumlah 6.16

16,500.00 7,040.00

16,500.00

23,540.00

1 M² PAS. PAGAR KAWAT JARING GALVANIS TINGGI 1 M TENAGA Tukang Kayu

0.125

Oh

85,000.00

Kepala Tukang

0.012

Oh

87,500.00

10,625.00 1,050.00

Pekerja/Buruh tak terampil

0.375

Oh

70,000.00

26,250.00

Mandor

0.019

Oh

90,000.00

1,710.00

0.525 Btg

BAHAN Kolom Beton Pracetak

370,700.00

194,617.50

Semen abu-abu / PC

10.500

Kg

1,386.00

14,553.00

Pasir Brantas (beton)

0.030



276,400.00

8,292.00

Koral Beton Split 1 - 2 Cm

0.050



353,800.00

17,690.00

1.100

M2

15,000.00

Kawat Ram ( Jaring )

Jumlah 6.16

16,500.00 39,635.00

1 M² PAS. PAGAR PANEL BETON TINGGI 1 M TENAGA Tukang Kayu

0.125

Oh

85,000.00

10,625.00

Kepala Tukang

0.012

Oh

87,500.00

1,050.00

Pekerja/Buruh tak terampil

0.375

Oh

70,000.00

26,250.00

251,652.50

291,287.50

6 1

2 Mandor

3

4

5

6

0.019

Oh

90,000.00

Panel Beton Pracetak

0.986

Lbr

215,000.00

211,990.00

Kolom Beton Pracetak

0.525 Btg

370,700.00

194,617.50 14,553.00

7

1,710.00

BAHAN

Semen abu-abu / PC

10.500

Kg

1,386.00

Pasir Brantas (beton)

0.030



276,400.00

8,292.00

Koral Beton Split 1 - 2 Cm

0.050



353,800.00

17,690.00

Jumlah

39,635.00

447,142.50

486,777.50

7 1

2

3

4

5

6

7

PEKERJAAN TANAH 6.1

1M³ GALIAN TANAH BIASA SEDALAM 1 M Pekerja/Buruh tak terampil Mandor

0.750

Oh

70,000.00

0.025

Oh

90,000.00

Jumlah 6.2

Pekerja/Buruh tak terampil

0.900

Oh

70,000.00

63,000.00

Mandor

0.045

Oh

90,000.00

4,050.00

Pekerja/Buruh tak terampil

1.050

Oh

70,000.00

Mandor

0.067

Oh

90,000.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

Mandor

0.032

Oh

90,000.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

Mandor

0.060

Oh

90,000.00

72,880.00

105,000.00 5,400.00

110,400.00

110,400.00

Pekerja/Buruh tak terampil

1.200

Oh

70,000.00

84,000.00

Mandor

0.045

Oh

90,000.00

4,050.00

88,050.00

88,050.00

1M² PEKERJAAN STRIPING TANAH SETINGGI 1 M Pekerja/Buruh tak terampil

0.050

Oh

70,000.00

Mandor

0.005

Oh

90,000.00

3,500.00 450.00

3,950.00

3,950.00

1M³ PEMBUANGAN TANAH SEJAUH 150 M Pekerja/Buruh tak terampil

0.516

Oh

70,000.00

Mandor

0.050

Oh

90,000.00

36,120.00 4,500.00

40,620.00

40,620.00

1M² URUGAN TANAH KEMBALI Mandor

0.192

Oh

70,000.00

0.019

Oh

90,000.00

Jumlah

13,440.00 1,710.00

15,150.00

15,150.00

1M³ PEMADATAN TANAH (Per 20 cm) Pekerja/Buruh tak terampil

0.500

Oh

70,000.00

35,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

Jumlah 6.11

2,880.00

1M³ GALIAN TANAH LUMPUR SEDALAM 1 M

Pekerja/Buruh tak terampil

6.10

70,000.00

1M³ GALIAN TANAH CADAS SEDALAM 1 M

Jumlah 6.9

79,530.00

72,880.00

Jumlah 6.8

6,030.00

1M³ GALIAN TANAH KERAS SEDALAM 1 M

Jumlah 6.7

73,500.00 79,530.00

Jumlah 6.6

67,050.00

67,050.00

1M³ GALIAN TANAH BIASA SEDALAM 3 M

Jumlah 6.5

54,750.00

1M³ GALIAN TANAH BIASA SEDALAM 2M

Jumlah 6.4

2,250.00 54,750.00

Jumlah 6.3

52,500.00

39,500.00

39,500.00

1M³ URUGAN TANAH BIASA TENAGA Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.010

Oh

90,000.00

900.00

1.200



60,300.00

BAHAN Tanah Biasa

Jumlah 6.12

72,360.00 21,900.00

72,360.00

1M³ URUGAN TANAH PILIHAN TENAGA Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.010

Oh

90,000.00

900.00

1.200



76,800.00

BAHAN Tanah Pilihan

92,160.00

94,260.00

8 1

2

3

4

Jumlah 6.13

5

6

21,900.00

92,160.00

7

114,060.00

1M³ URUGAN PASIR TENAGA Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.010

Oh

90,000.00

900.00

1.200



120,700.00

BAHAN Pasir Urug

Jumlah

144,840.00 21,900.00

144,840.00

166,740.00

9 1 6.14

2

3

4

5

6

7

1M³ URUGAN SIRTU TENAGA Pekerja/Buruh tak terampil

0.250

Oh

70,000.00

17,500.00

Mandor BAHAN

0.025

Oh

90,000.00

2,250.00

1.200



126,000.00

Sirtu Urug

Jumlah 6.15

151,200.00 19,750.00

151,200.00

170,950.00

1M³ LAPISAN PUDEL CAMP. 1 kp : 3 psr : 7 TL . TENAGA Tukang

0.400

Oh

85,000.00

Kepala Tukang

0.040

Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.800

Oh

70,000.00

56,000.00

Mandor BAHAN

0.080

Oh

90,000.00

7,200.00

Pasir Urug

0.400



120,700.00

48,280.00

Kapur Pasang

0.135



761,000.00

102,735.00

0.948



69,300.00

Tanah Liat

Jumlah 6.16

34,000.00

65,696.40 100,700.00

216,711.40

317,411.40

1M³ LAPISAN PUDEL CAMP. 1 kp : 5 TL . TENAGA Tukang

0.400

Oh

85,000.00

Kepala Tukang

0.040

Oh

87,500.00

34,000.00 3,500.00

Pekerja/Buruh tak terampil

0.800

Oh

70,000.00

56,000.00

Mandor

0.080

Oh

90,000.00

7,200.00

Kapur Pasang

0.248



761,000.00

Tanah Liat

1.240



69,300.00

BAHAN

Jumlah 6.17

188,728.00 85,932.00 100,700.00

274,660.00

375,360.00

1M2 PASANG LAPISAN IJUK TEBAL 10 CM TENAGA Pekerja/Buruh tak terampil

0.150

Oh

70,000.00

10,500.00

Mandor

0.015

Oh

90,000.00

1,350.00

6.000 Kg

28,300.00

BAHAN IJUK

Jumlah 6.18

169,800.00 11,850.00

169,800.00

181,650.00

1M² PEMBUATAN JALAN SEMENTARA TEBAL 25 CM TENAGA Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.100

Oh

90,000.00

9,000.00

Batu Belah 15/25 cm

0.275



253,500.00

69,712.50

Batu Pecah 5 - 7

0.030



253,500.00

7,605.00

Pasir Urug

0.050



120,700.00

BAHAN

Jumlah

6,035.00 79,000.00

83,352.50

162,352.50

10 1

2

3

4

5

6

7

PEKERJAAN PASANGAN PONDASI BATU BELAH Pasir Brantas (beton) 6.1

1 M³ PAS. POND. BATU BELAH CAM 1 Pc : 1 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

51,000.00 5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

BAHAN Batu Belah 15/20 cm

1.200



253,500.00

304,200.00

Semen abu-abu / PC

392.000

Kg

1,386.00

543,312.00

Pasir Brantas (beton)

0.314



276,400.00

Jumlah 6.2

86,789.60 168,000.00

934,301.60

1,102,301.60

1 M³ PAS. POND. BATU BELAH CAM 1 Pc : 2 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

51,000.00 5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

BAHAN Batu Belah 15/20 cm

1.200



253,500.00

304,200.00

Semen abu-abu / PC

267.000

Kg

1,386.00

370,062.00

Pasir Brantas (beton)

0.427



276,400.00

Jumlah 6.3

118,022.80 168,000.00

792,284.80

960,284.80

1 M³ PAS. POND. BATU BELAH CAM 1 Pc : 3 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

51,000.00 5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

BAHAN Batu Belah 15/20 cm

1.200



253,500.00

304,200.00

Semen abu-abu / PC

202.000

Kg

1,386.00

279,972.00

Pasir Brantas (beton)

0.485



276,400.00

Jumlah 6.4

134,054.00 168,000.00

718,226.00

886,226.00

1 M³ PAS. POND. BATU BELAH CAM 1 Pc : 4 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

51,000.00 5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

BAHAN Batu Belah 15/20 cm

1.200



253,500.00

304,200.00

Semen abu-abu / PC

163.000

Kg

1,386.00

225,918.00

Pasir Brantas (beton)

0.520



276,400.00

Jumlah 6.5

143,728.00 168,000.00

673,846.00

1 M³ PAS. POND. BATU BELAH CAM 1 Pc : 5 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

51,000.00 5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

1.200



253,500.00

BAHAN Batu Belah 15/20 cm

304,200.00

841,846.00

11 1

2 Semen abu-abu / PC Pasir Brantas (beton)

3

4

136.000

Kg

1,386.00

0.544



276,400.00

Jumlah 6.6

5

6

7

188,496.00 150,361.60 168,000.00

643,057.60

811,057.60

1 M³ PAS. POND. BATU BELAH CAM 1 Pc : 6 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

51,000.00 5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

BAHAN Batu Belah 15/20 cm

1.200



253,500.00

304,200.00

Semen abu-abu / PC

117.000

Kg

1,386.00

162,162.00

Pasir Brantas (beton)

0.561



276,400.00

Jumlah

155,060.40 168,000.00

621,422.40

789,422.40

12 1 6.7

2

3

4

5

6

7

1 M³ PAS. POND. BATU BELAH CAM 1 Pc : 8 Psr TENAGA Tukang

0.600

Oh

85,000.00

51,000.00

Kepala Tukang

0.060

Oh

87,500.00

5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

BAHAN Batu Belah 15/20 cm

1.200



253,500.00

304,200.00

Semen abu-abu / PC

91.000

Kg

1,386.00

126,126.00

Pasir Brantas (beton)

0.584



276,400.00

161,417.60

Jumlah

168,000.00

591,743.60

759,743.60

Pasir Brantas (beton) 6.8

1 M³ PAS. POND. BATU BELAH CAM 1 Kp :1Sm ; 1 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor BAHAN

0.075

Oh

90,000.00

6,750.00

Batu Belah 15/20 cm

1.200



253,500.00

304,200.00

Kapur Pasang

0.229



761,000.00

174,269.00

Semen Merah

0.229



225,900.00

51,731.10

Pasir Brantas (beton)

0.544



276,400.00

150,361.60

Jumlah 6.9

51,000.00

168,000.00

680,561.70

848,561.70

1 M³ PAS. POND. BATU BELAH CAM 1 Kp :1Sm ; 2 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

51,000.00 5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

Batu Belah 15/20 cm

1.200



253,500.00

304,200.00

Kapur Pasang

0.170



761,000.00

129,370.00

Semen Merah

0.170



225,900.00

38,403.00

Pasir Brantas (beton)

0.340



276,400.00

BAHAN

Jumlah 6.10

93,976.00 168,000.00

565,949.00

733,949.00

1 M³ PAS. POND. BATU BELAH CAM 1Pc; 3 Kp ; 10 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

51,000.00 5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

BAHAN Batu Belah 15/20 cm

1.200



253,500.00

61.000

Kg

1,386.00

84,546.00

Kapur Pasang

0.147



761,000.00

111,867.00

Pasir Brantas (beton)

0.492



276,400.00

135,988.80

Semen Pc

Jumlah 6.11

304,200.00

168,000.00

1 M³ PAS. POND. BATU BELAH CAM 1Pc; 1/4 Kp ; 4 Psr TENAGA Tukang

0.600

Oh

85,000.00

51,000.00

Kepala Tukang

0.060

Oh

87,500.00

5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

BAHAN

636,601.80

804,601.80

13 1

2

3

Batu Belah 15/20 cm Semen Pc

4

1.200



6 304,200.00 216,216.00

156.000

Kg

1,386.00

Kapur Pasang

0.032



761,000.00

24,352.00

Pasir Brantas (beton)

0.584



276,400.00

161,417.60

Jumlah 6.12

5

253,500.00

168,000.00

706,185.60

7

874,185.60

1 M³ PAS. POND. BATU BELAH KOSONGAN TENAGA Tukang

0.390

Oh

85,000.00

Kepala Tukang

0.039

Oh

87,500.00

33,150.00 3,412.50

Pekerja/Buruh tak terampil

0.780

Oh

70,000.00

54,600.00

Mandor

0.039

Oh

90,000.00

3,510.00

1.200



253,500.00

0.432



120,700.00

BAHAN Batu Belah 15/20 cm Pasir Urug

Jumlah

304,200.00 52,142.40 94,672.50

356,342.40

451,014.90

14 1 6.13

2

3

4

5

6

7

1 M³ PAS. POND. SUMURAN dia. 100 cm. TENAGA Tukang

0.300

Oh

85,000.00

25,500.00

Kepala Tukang

0.030

Oh

87,500.00

2,625.00

Pekerja/Buruh tak terampil

2.380

Oh

70,000.00

166,600.00

Mandor

0.080

Oh

90,000.00

7,200.00

BAHAN Batu Belah 15/20 cm Semen Pc Pasir Brantas (beton) Koral Beton Split 1 - 2 cm.

0.450



253,500.00

114,075.00

194.000

Kg

1,386.00

268,884.00

0.312



276,400.00

86,236.80

0.468



353,800.00

Jumlah 6.14

165,578.40 201,925.00

634,774.20

836,699.20

1 M' PEMB. TIANG PANCANG ( 40 x 40 ) CM BETON BERTULANG TENAGA Tukang Batu

0.670

Oh

85,000.00

56,950.00

Kepala Tukang

0.067

Oh

87,500.00

5,862.50

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

BAHAN Pasir Urug

0.019



120,700.00

2,293.30

Semen Pc

60.500

Kg

1,386.00

83,853.00

Pasir Brantas (beton)

0.094



276,400.00

25,981.60

Koral Beton Split 1 - 2 cm.

0.150



353,800.00

53,070.00

45.000

Kg

12,100.00

544,500.00

Kawat Tali ( Bendrat )

0.900

Kg

16,900.00

15,210.00

Kayu Kaso 5 / 7 cm

0.032



7,486,000.00

239,552.00

Paku

0.120

Kg

13,800.00

1,656.00

Minyak Begesting

0.090

Lt

31,300.00

2,817.00

Plamur Tembok

0.240

Kg

6,400.00

Besi Beton

Jumlah 6.15

1,536.00 137,312.50

970,468.90

1,107,781.40

1 M' PEMB. TIANG PANCANG ( 35 x 35 ) CM BETON BERTULANG TENAGA Tukang Batu

0.500

Oh

85,000.00

Kepala Tukang

0.050

Oh

87,500.00

42,500.00 4,375.00

Pekerja/Buruh tak terampil

0.800

Oh

70,000.00

56,000.00

Mandor

0.040

Oh

90,000.00

3,600.00

BAHAN Pasir Urug

0.016



120,700.00

1,931.20

Semen Pc

49.000

Kg

1,386.00

67,914.00

Pasir Brantas (beton)

0.080



276,400.00

22,112.00

Koral Beton Split 1 - 2 cm.

0.125



353,800.00

44,225.00

34.500

Kg

12,100.00

417,450.00

Kawat Tali ( Bendrat )

0.700

Kg

16,900.00

11,830.00

Kayu Kaso 5 / 7 cm

0.027



7,486,000.00

202,122.00

Paku

0.120

Kg

13,800.00

1,656.00

Minyak Begesting

0.090

Lt

31,300.00

2,817.00

Plamur Tembok

0.200

Kg

6,400.00

1,280.00

Besi Beton

Jumlah

106,475.00

773,337.20

879,812.20

15 1

2

3

4

5

6

7

PEKERJAAN PASANGAN BATA MERAH Pasir Brantas (beton) ( TEBAL PASANGAN 1/2 BT ) 6.1

1 M² PAS. BATA MERAH CAM 1 Pc : 1 Psr TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.320

Oh

70,000.00

22,400.00

Mandor

0.015

Oh

90,000.00

1,350.00

Bata Merah

70.000

Biji

1,040.00

72,800.00

Semen abu-abu / PC

27.800

Kg

1,386.00

38,530.80

Pasir Brantas (beton)

0.028



276,400.00

BAHAN

Jumlah 6.2

7,739.20 33,125.00

119,070.00

152,195.00

1 M² PAS. BATA MERAH CAM 1 Pc : 2 Psr TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

Bata Merah

70.000

Biji

1,040.00

72,800.00

Semen abu-abu / PC

18.950

Kg

1,386.00

26,264.70

Pasir Brantas (beton)

0.038



276,400.00

BAHAN

Jumlah 6.3

10,503.20 31,725.00

109,567.90

141,292.90

1 M² PAS. BATA MERAH CAM 1 Pc : 3 Psr TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

Bata Merah

70.000

Biji

1,040.00

72,800.00

Semen abu-abu / PC

14.370

Kg

1,386.00

19,916.82

Pasir Brantas (beton)

0.040



276,400.00

BAHAN

Jumlah 6.4

11,056.00 31,725.00

103,772.82

135,497.82

1 M² PAS. BATA MERAH CAM 1 Pc : 4 Psr TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

Bata Merah

70.000

Biji

1,040.00

72,800.00

Semen abu-abu / PC

11.500

Kg

1,386.00

15,939.00

Pasir Brantas (beton)

0.043



276,400.00

BAHAN

Jumlah 6.5

11,885.20 31,725.00

100,624.20

1 M² PAS. BATA MERAH CAM 1 Pc : 5 Psr TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

70.000

Biji

1,040.00

BAHAN Bata Merah

72,800.00

132,349.20

16 1

2 Semen abu-abu / PC Pasir Brantas (beton)

3

4

9.680

Kg

1,386.00

0.045



276,400.00

Jumlah 6.6

5

6

7

13,416.48 12,438.00 31,725.00

98,654.48

130,379.48

1 M² PAS. BATA MERAH CAM 1 Pc : 6 Psr TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

BAHAN Bata Merah

70.000

Biji

1,040.00

Semen abu-abu / PC

8.320

Kg

1,386.00

11,531.52

Pasir Brantas (beton)

0.049



276,400.00

13,543.60

Jumlah

72,800.00

31,725.00

97,875.12

129,600.12

17 1 6.7

2

3

4

5

6

7

1 M² PAS. BATA MERAH CAM 1 Pc : 8 Psr TENAGA Tukang

0.100

Oh

85,000.00

8,500.00

Kepala Tukang

0.010

Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

BAHAN Bata Merah

70.000

Biji

1,040.00

Semen abu-abu / PC

6.500

Kg

1,386.00

9,009.00

Pasir Brantas (beton)

0.050



276,400.00

13,820.00

Jumlah 6.8

72,800.00

31,725.00

95,629.00

127,354.00

1 M² PAS. BATA MERAH CAM 1 Kp : 1 Sm ; 1Psr TENAGA Tukang

0.100

Oh

85,000.00

8,500.00

Kepala Tukang

0.010

Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

BAHAN Bata Merah

70.000

Biji

1,040.00

72,800.00

Kapur Pasang

0.018



761,000.00

13,698.00

Semen Merah

0.018



225,900.00

4,066.20

0.018



276,400.00

Pasir Brantas (beton)

Jumlah 6.9

4,975.20 31,725.00

95,539.40

127,264.40

1 M² PAS. BATA MERAH CAM 1 Kp : 1 Sm ; 2Psr TENAGA Tukang

0.100

Oh

85,000.00

8,500.00

Kepala Tukang

0.010

Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

70.000

Biji

1,040.00

72,800.00

Kapur Pasang

0.014



761,000.00

10,654.00

Semen Merah

0.014



225,900.00

3,162.60

Pasir Brantas (beton)

0.028



276,400.00

BAHAN Bata Merah

Jumlah 6.10

7,739.20 31,725.00

94,355.80

126,080.80

1 M² PAS. BATA MERAH CAM 1 Pc : 3 Kp ; 10 Psr TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

BAHAN Bata Merah

70.000

Biji

1,040.00

Semen abu-abu / PC

4.500

Kg

1,386.00

6,237.00

Kapur Pasang

0.015



761,000.00

11,415.00

0.050



276,400.00

Pasir Brantas (beton)

Jumlah

72,800.00

13,820.00 31,725.00

Pasir Brantas (beton) ( TEBAL PASANGAN 1 BT ) 6.11

1 M² PAS. . BATA MERAH CAM 1 Pc : 2 Psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

Kepala Tukang

0.020

Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

104,272.00

135,997.00

18 1

2

3

4

5

6

7

BAHAN Bata Merah

140.000

Biji

1,040.00

145,600.00

Semen abu-abu / PC

43.500

Kg

1,386.00

60,291.00

Pasir Brantas (beton)

0.080



276,400.00

22,112.00

Jumlah 6.12

63,450.00

228,003.00

291,453.00

1 M² PAS. . BATA MERAH CAM 1 Pc : 3 Psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

Kepala Tukang

0.020

Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

BAHAN Bata Merah

140.000

Biji

1,040.00

145,600.00

Semen abu-abu / PC

32.950

Kg

1,386.00

45,668.70

Pasir Brantas (beton)

0.091



276,400.00

25,152.40

Jumlah

63,450.00

216,421.10

279,871.10

19 1 6.13

2

3

4

5

6

7

1 M² PAS. . BATA MERAH CAM 1 Pc : 4 Psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

17,000.00

Kepala Tukang

0.020

Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

140.000

Biji

1,040.00

145,600.00

Semen abu-abu / PC

26.550

Kg

1,386.00

36,798.30

Pasir Brantas (beton)

0.093



276,400.00

BAHAN Bata Merah

Jumlah 6.14

25,705.20 63,450.00

208,103.50

271,553.50

1 M² PAS. . BATA MERAH CAM 1 Pc : 5 Psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

17,000.00

Kepala Tukang

0.020

Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

140.000

Biji

1,040.00

145,600.00

Semen abu-abu / PC

22.200

Kg

1,386.00

30,769.20

Pasir Brantas (beton)

0.102



276,400.00

BAHAN Bata Merah

Jumlah 6.15

28,192.80 63,450.00

204,562.00

268,012.00

1 M² PAS. . BATA MERAH CAM 1 Pc : 6 Psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

17,000.00

Kepala Tukang

0.020

Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

140.000

Biji

1,040.00

145,600.00

Semen abu-abu / PC

22.200

Kg

1,386.00

30,769.20

Pasir Brantas (beton)

0.102



276,400.00

BAHAN Bata Merah

Jumlah 6.16

28,192.80 63,450.00

204,562.00

268,012.00

1 M² PAS. . BATA MERAH CAM 1 Pc : 3Kp ; 10 Psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

17,000.00

Kepala Tukang

0.020

Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

140.000

Biji

1,040.00

145,600.00

Semen abu-abu / PC

10.080

Kg

1,386.00

13,970.88

Kapur Pasang

0.0275



761,000.00

20,927.50

Pasir Brantas (beton)

0.0925



276,400.00

BAHAN Bata Merah

Jumlah 6.17

25,567.00 63,450.00

206,065.38

1 M² PAS. . BATA MERAH CAM 1 kp : 1 sm : 1 psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

Kepala Tukang

0.020

Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

BAHAN Bata Merah

140.000

Biji

1,040.00

145,600.00

Kapur Pasang

0.018



761,000.00

13,698.00

Semen merah

0.0180



225,900.00

4,066.20

269,515.38

20 1

2 Pasir Brantas (beton)

3 0.0180

4 M³

Jumlah 6.18

5

276,400.00

6

7

4,975.20 63,450.00

168,339.40

231,789.40

1 M² PAS. . BATA MERAH CAM 1 kp : 1 sm : 2 psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

Kepala Tukang

0.020

Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

140.000

Biji

1,040.00

145,600.00

Kapur Pasang

0.014



761,000.00

10,654.00

Semen merah

0.0140



225,900.00

3,162.60

Pasir Brantas (beton)

0.0280



276,400.00

BAHAN Bata Merah

Jumlah

7,739.20 63,450.00

167,155.80

230,605.80

21 1 6.19

2

3

4

5

6

7

1 M² PAS. ROSTER / TERAWANG ( 1/2 BT) CAM 1PC : 4PSR UK 20 X 20 TENAGA Tukang

0.100

Oh

85,000.00

8,500.00

Kepala Tukang

0.010

Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

Terawang (Roster)

30.000

Biji

24,100.00

723,000.00

Semen abu-abu / PC

11.000

Kg

1,386.00

15,246.00

Pasir Brantas (beton)

0.0350



276,400.00

9,674.00

BAHAN

Jumlah

31,725.00

747,920.00

779,645.00

22 1

2

3

4

5

6

7

PEKERJAAN PLESTERAN Pasir Brantas (beton) 6.1

1 M² PLESTERAN CAM 1 Pc ; 1 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.150

Oh

85,000.00

Kepala Tukang

0.015

Oh

87,500.00

12,750.00 1,312.50

Pekerja/Buruh tak terampil

0.200

Oh

70,000.00

14,000.00

Mandor

0.010

Oh

90,000.00

900.00

Semen abu-abu / PC

15.504

Kg

1,386.00

Pasir Brantas (beton)

0.016



276,400.00

BAHAN

Jumlah 6.2

21,488.54 4,422.40 28,962.50

25,910.94

54,873.44

1 M² PLESTERAN CAM 1 Pc ; 2 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.150

Oh

85,000.00

Kepala Tukang

0.015

Oh

87,500.00

12,750.00 1,312.50

Pekerja/Buruh tak terampil

0.200

Oh

70,000.00

14,000.00

Mandor

0.010

Oh

90,000.00

900.00

Semen abu-abu / PC

10.224

Kg

1,386.00

Pasir Brantas (beton)

0.020



276,400.00

BAHAN

Jumlah 6.3

14,170.46 5,528.00 28,962.50

19,698.46

48,660.96

1 M² PLESTERAN CAM 1 Pc ; 3Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.150

Oh

85,000.00

Kepala Tukang

0.015

Oh

87,500.00

12,750.00 1,312.50

Pekerja/Buruh tak terampil

0.200

Oh

70,000.00

14,000.00

Mandor

0.010

Oh

90,000.00

900.00

7.776

Kg

1,386.00

0.023



276,400.00

BAHAN Semen abu-abu / PC Pasir Brantas (beton)

Jumlah 6.4

10,777.54 6,357.20 28,962.50

17,134.74

46,097.24

1 M² PLESTERAN CAM 1 Pc ; 4 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.150

Oh

85,000.00

12,750.00

Kepala Tukang

0.015

Oh

87,500.00

1,312.50

Pekerja/Buruh tak terampil

0.200

Oh

70,000.00

14,000.00

Mandor

0.010

Oh

90,000.00

900.00

Semen abu-abu / PC

6.240

Kg

1,386.00

8,648.64

Pasir Brantas (beton)

0.024



276,400.00

6,633.60

BAHAN

Jumlah 6.5

28,962.50

15,282.24

44,244.74

1 M² PLESTERAN CAM 1 Pc ; 5 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.150

Oh

85,000.00

12,750.00

Kepala Tukang

0.015

Oh

87,500.00

1,312.50

Pekerja/Buruh tak terampil

0.200

Oh

70,000.00

14,000.00

Mandor

0.010

Oh

90,000.00

900.00

Semen abu-abu / PC

5.184

Kg

1,386.00

Pasir Brantas (beton)

0.026



276,400.00

BAHAN

Jumlah 6.6

1 M² PLESTERAN CAM 1 Pc ; 6 Psr ( TEBAL 1,5 CM) TENAGA

7,185.02 7,186.40 28,962.50

14,371.42

43,333.92

23 1

2

3

4

5

6

Tukang

0.150

Oh

85,000.00

Kepala Tukang

0.015

Oh

87,500.00

1,312.50

Pekerja/Buruh tak terampil

0.200

Oh

70,000.00

14,000.00

Mandor

0.010

Oh

90,000.00

900.00

Semen abu-abu / PC

4.416



1,386.00

Pasir Brantas (beton)

0.027



276,400.00

7

12,750.00

BAHAN

Jumlah

6,120.58 7,462.80 28,962.50

13,583.38

42,545.88

24 1 6.7

2

3

4

5

6

7

1 M² PLESTERAN CAM 1 Pc ; 8 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.150

Oh

85,000.00

12,750.00

Kepala Tukang

0.015

Oh

87,500.00

1,312.50

Pekerja/Buruh tak terampil

0.200

Oh

70,000.00

14,000.00

Mandor

0.010

Oh

90,000.00

900.00

Semen abu-abu / PC

3.456

Kg

1,386.00

Pasir Brantas (beton)

0.029



276,400.00

BAHAN

Jumlah 6.8

4,790.02 8,015.60 28,962.50

12,805.62

41,768.12

1 M² PLESTERAN CAM 1 Kp ; 1Sm ; 1 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.120

Oh

85,000.00

Kepala Tukang

0.012

Oh

87,500.00

10,200.00 1,050.00

Pekerja/Buruh tak terampil

0.220

Oh

70,000.00

15,400.00

Mandor

0.011

Oh

90,000.00

990.00

Kapur Pasang

0.009



761,000.00

6,849.00

Semen Merah

0.009



225,900.00

2,033.10

Pasir Brantas (beton)

0.009



276,400.00

BAHAN

Jumlah 6.9

2,487.60 27,640.00

11,369.70

39,009.70

1 M² PLESTERAN CAM 1 Kp ; 1Sm ; 2 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.120

Oh

85,000.00

Kepala Tukang

0.012

Oh

87,500.00

10,200.00 1,050.00

Pekerja/Buruh tak terampil

0.220

Oh

70,000.00

15,400.00

Mandor

0.011

Oh

90,000.00

990.00

Kapur Pasang

0.007



761,000.00

5,327.00

Semen Merah

0.007



225,900.00

1,581.30

Pasir Brantas (beton)

0.015



276,400.00

4,146.00

BAHAN

Jumlah 6.10

27,640.00

11,054.30

38,694.30

1 M² PLESTERAN CAM 1Pc ; 2 Kp ; 8 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.120

Oh

85,000.00

Kepala Tukang

0.012

Oh

87,500.00

10,200.00 1,050.00

Pekerja/Buruh tak terampil

0.220

Oh

70,000.00

15,400.00

Mandor

0.011

Oh

90,000.00

990.00

Semen abu-abu / PC

3.000

Kg

1,386.00

4,158.00

Kapur Pasang

0.005



761,000.00

3,805.00

Pasir Brantas (beton)

0.020



276,400.00

5,528.00

BAHAN

Jumlah 6.11

27,640.00

13,491.00

41,131.00

1 M² BERAPEN CAM 1Pc ; 5 Psr TENAGA Tukang

0.070

Oh

85,000.00

Kepala Tukang

0.007

Oh

87,500.00

5,950.00 612.50

Pekerja/Buruh tak terampil

0.150

Oh

70,000.00

10,500.00

Mandor

0.008

Oh

90,000.00

720.00

Semen abu-abu / PC

5.184

Kg

1,386.00

Pasir Brantas (beton)

0.026



276,400.00

BAHAN

Jumlah 6.12

1 M² PLESTERAN SIAR UNTUK DINDING BATA TENAGA

7,185.02 7,186.40 17,782.50

14,371.42

32,153.92

25 1

2

3

4

5

6

Tukang

0.070

Oh

85,000.00

Kepala Tukang

0.007

Oh

87,500.00

612.50

Pekerja/Buruh tak terampil

0.150

Oh

70,000.00

10,500.00

Mandor

0.008

Oh

90,000.00

720.00

3.108

Kg

1,386.00

7

5,950.00

BAHAN Semen abu-abu / PC

Jumlah 6.13

4,307.69 17,782.50

4,307.69

22,090.19

1 M² PLESTERAN SIAR UNTUK PASANGAN BATU CAM 1PC : 2Psr TENAGA Tukang

0.140

Oh

85,000.00

11,900.00

Kepala Tukang

0.014

Oh

87,500.00

1,225.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

6.340

Kg

1,386.00

0.012



276,400.00

BAHAN Semen abu-abu / PC Pasir Brantas (beton)

Jumlah

8,787.24 3,316.80 35,475.00

12,104.04

47,579.04

26 1 6.14

2

3

4

5

6

7

1 M² ACIAN BETON TENAGA Tukang

0.100

Oh

85,000.00

8,500.00

Kepala Tukang

0.010

Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.150

Oh

70,000.00

10,500.00

Mandor

0.008

Oh

90,000.00

720.00

3.250

Kg

1,386.00

BAHAN Semen abu-abu / PC

Jumlah

4,504.50 20,595.00

4,504.50

25,099.50

27 1

2

3

4

5

6

7

PEKERJAAN KAYU PEMBUATAN KOZEN PINTU - JENDELA PEK. PASANG PINTU DAN JENDELA 6.1

1 M³ PASANG KOZEN PINTU / JENDELA KAYU JATI TENAGA Tukang

18.000

Oh

85,000.00

1,530,000.00

Kepala Tukang

2.000

Oh

87,500.00

175,000.00

Pekerja/Buruh tak terampil

6.000

Oh

70,000.00

420,000.00

Mandor

0.300

Oh

90,000.00

27,000.00

Kayu jati 6/15

1.100



19,018,000.00

20,919,800.00

Paku 10 cm

1.250

kg

13,800.00

17,250.00

Lem Kayu

1.000

kg

14,400.00

BAHAN

Jumlah 6.2

14,400.00 2,152,000.00

20,951,450.00

23,103,450.00

1 M³ PASANG KOZEN PINTU / JENDELA KAYU KAMPER TENAGA Tukang

18.000

Oh

85,000.00

1,530,000.00

Kepala Tukang

2.000

Oh

87,500.00

175,000.00

Pekerja/Buruh tak terampil

6.000

Oh

70,000.00

420,000.00

Mandor

0.300

Oh

90,000.00

27,000.00

Kayu Kamper 6/15

1.200



15,093,000.00

18,111,600.00

Paku 10 cm

1.250

kg

13,800.00

17,250.00

Lem Kayu

1.000

kg

14,400.00

BAHAN

Jumlah 6.3

14,400.00 2,152,000.00

18,143,250.00

20,295,250.00

1 M³ PASANG KOZEN PINTU / JENDELA KAYU BALAU TENAGA Tukang

18.000

Oh

85,000.00

1,530,000.00

Kepala Tukang

2.000

Oh

87,500.00

175,000.00

Pekerja/Buruh tak terampil

6.000

Oh

70,000.00

420,000.00

Mandor

0.300

Oh

90,000.00

27,000.00

Kayu Balau 6/15

1.200



15,286,000.00

18,343,200.00

Paku 10 cm

1.250

kg

13,800.00

17,250.00

Lem Kayu

1.000

kg

14,400.00

BAHAN

Jumlah 6.4

14,400.00 2,152,000.00

18,374,850.00

20,526,850.00

1 M³ PASANG KOZEN PINTU / JENDELA KAYU TAHUN TENAGA Tukang

18.000

Oh

85,000.00

1,530,000.00

Kepala Tukang

2.000

Oh

87,500.00

175,000.00

Pekerja/Buruh tak terampil

6.000

Oh

70,000.00

420,000.00

Mandor

0.300

Oh

90,000.00

27,000.00

Kayu Tahun 6/15

1.200



7,486,000.00

8,983,200.00

Paku 10 cm

1.250

kg

13,800.00

17,250.00

Lem Kayu

1.000

kg

14,400.00

BAHAN

Jumlah 6.5

14,400.00 2,152,000.00

9,014,850.00

1 M² PASANG DAUN PINTU PANIL KAYU JATI TENAGA Tukang

2.500

Oh

85,000.00

212,500.00

Kepala Tukang

0.250

Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

0.040



19,687,000.00

BAHAN Papan Kayu jati

787,480.00

11,166,850.00

28 1

2 Lem Kayu

3 0.500

4 kg

Jumlah 6.6

5

14,400.00

6

7

7,200.00 308,875.00

794,680.00

1,103,555.00

1 M² PASANG DAUN PINTU PANIL KAYU KAMPER TENAGA Tukang

2.500

Oh

85,000.00

212,500.00

Kepala Tukang

0.250

Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

0.040



15,395,000.00

0.500

kg

14,400.00

BAHAN Papan Kayu Kanper Lem Kayu

Jumlah

615,800.00 7,200.00 308,875.00

623,000.00

931,875.00

29 1 6.7

2

3

4

5

6

7

1 M² PASANG DAUN PINTU PANIL KAYU BALAU TENAGA Tukang

2.500

Oh

85,000.00

212,500.00

Kepala Tukang

0.250

Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

Papan Kayu Balau

0.040



16,180,000.00

Lem Kayu

0.500

kg

14,400.00

BAHAN

Jumlah 6.8

647,200.00 7,200.00 308,875.00

654,400.00

963,275.00

1 M² PASANG DAUN PINTU PANIL KAYU TAHUN TENAGA Tukang

2.500

Oh

85,000.00

212,500.00

Kepala Tukang

0.250

Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

Papan Kayu Tahun

0.040



7,848,000.00

Lem Kayu

0.500

kg

14,400.00

BAHAN

Jumlah 6.9

313,920.00 7,200.00 308,875.00

321,120.00

629,995.00

1 M² PASANG DAUN PINTU/JENDEL KACA KAYU JATI TENAGA Tukang

2.000

Oh

85,000.00

170,000.00

Kepala Tukang

0.200

Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800

Oh

70,000.00

56,000.00

Mandor

0.040

Oh

90,000.00

3,600.00

Papan Kayu jati

0.024



19,687,000.00

Lem Kayu

0.300

kg

14,400.00

BAHAN

Jumlah 6.10

472,488.00 4,320.00 247,100.00

476,808.00

723,908.00

1 M² PASANG DAUN PINTU /JENDEL KACA KAYU KAMPER TENAGA Tukang

2.000

Oh

85,000.00

170,000.00

Kepala Tukang

0.200

Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800

Oh

70,000.00

56,000.00

Mandor

0.040

Oh

90,000.00

3,600.00

Papan Kayu Kamper

0.024



15,395,000.00

Lem Kayu

0.300

kg

14,400.00

BAHAN

Jumlah 6.11

369,480.00 4,320.00 247,100.00

373,800.00

620,900.00

1 M² PASANG DAUN PINTU / JENDELA KACA KAYU BALAU TENAGA Tukang

2.000

Oh

85,000.00

170,000.00

Kepala Tukang

0.200

Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800

Oh

70,000.00

56,000.00

Mandor

0.040

Oh

90,000.00

3,600.00

0.024



16,180,000.00

0.300

kg

14,400.00

BAHAN Papan Kayu Balau Lem Kayu

Jumlah 6.13

388,320.00 4,320.00 247,100.00

1 M² PASANG DAUN PINTU /JENDELA KACA KAYU TAHUN TENAGA Tukang

2.000

Oh

85,000.00

170,000.00

Kepala Tukang

0.200

Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800

Oh

70,000.00

56,000.00

392,640.00

639,740.00

30 1

2 Mandor

3

4

5

6

0.040

Oh

90,000.00

Papan Kayu Tahun

0.024



7,848,000.00

188,352.00

Lem Kayu

0.300

kg

14,400.00

4,320.00

7

3,600.00

BAHAN

Jumlah 6.14

247,100.00

192,672.00

439,772.00

1 M² PASANG DAUN PINTU/JENDEL JALUSI KAYU JATI TENAGA Tukang

3.000

Oh

85,000.00

255,000.00

Kepala Tukang

0.300

Oh

87,500.00

26,250.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

Papan Kayu jati

0.064



19,687,000.00

Lem Kayu

0.500

kg

14,400.00

BAHAN

Jumlah

1,259,968.00 7,200.00 355,750.00

1,267,168.00

1,622,918.00

31 1 6.15

2

3

4

5

6

7

1 M² PASANG DAUN PINTU /JENDEL JALUSI KAYU KAMPER TENAGA Tukang

3.000

Oh

85,000.00

255,000.00

Kepala Tukang

0.300

Oh

87,500.00

26,250.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

Papan Kayu Kanper

0.064



15,395,000.00

Lem Kayu

0.500

kg

14,400.00

BAHAN

Jumlah 6.16

985,280.00 7,200.00 355,750.00

992,480.00

1,348,230.00

1 M² PASANG DAUN PINTU / JENDELA JALUSI KAYU BALAU TENAGA Tukang

3.000 Oh

85,000.00

255,000.00

Kepala Tukang

0.300 Oh

87,500.00

26,250.00

Pekerja/Buruh tak terampil

1.000 Oh

70,000.00

70,000.00

Mandor

0.050 Oh

90,000.00

4,500.00

BAHAN Papan Kayu Balau

0.064



16,180,000.00

Lem Kayu

0.500

kg

14,400.00

Jumlah 6.17

1,035,520.00 7,200.00 355,750.00

1,042,720.00

1,398,470.00

1 M² PASANG DAUN PINTU /JENDELA JALUSI KAYU TAHUN TENAGA Tukang

3.000 Oh

85,000.00

255,000.00

Kepala Tukang

0.300 Oh

87,500.00

26,250.00

Pekerja/Buruh tak terampil

1.000 Oh

70,000.00

70,000.00

Mandor

0.050 Oh

90,000.00

4,500.00

BAHAN Papan Kayu Tahun

0.064



7,848,000.00

Lem Kayu

0.500

kg

14,400.00

Jumlah 6.18

502,272.00 7,200.00 355,750.00

509,472.00

865,222.00

1 M² PASANG JALUSI KUSEN KAYU JATI TENAGA Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.500 Oh

70,000.00

35,000.00

Mandor

0.025 Oh

90,000.00

2,250.00

BAHAN Papan Kayu jati

0.060



19,687,000.00

Paku`1cm - 2,5cm

0.150

Kg

13,800.00

Jumlah 6.19

1,181,220.00 2,070.00 224,750.00

1,183,290.00

1,408,040.00

1 M² PASANG JALUSI KUSEN KAYU KAMPER TENAGA Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.500 Oh

70,000.00

35,000.00

Mandor

0.025 Oh

90,000.00

2,250.00

BAHAN Papan Kayu Kanper Paku`1cm - 2,5cm

0.060



15,395,000.00

0.150

Kg

13,800.00

Jumlah 6.20

923,700.00 2,070.00 224,750.00

1 M² PASANG JALUSI KUSEN KAYU BALAU TENAGA Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.500 Oh

70,000.00

35,000.00

925,770.00

1,150,520.00

32 1

2 Mandor

3

4

0.025 Oh

90,000.00

5

6

7

2,250.00

BAHAN Papan Kayu Balau

0.060



16,180,000.00

970,800.00

Paku`1cm - 2,5cm

0.150

Kg

13,800.00

2,070.00

Jumlah 6.21

224,750.00

972,870.00

1,197,620.00

1 M² PASANG JALUSI KUSEN KAYU TAHUN Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.500 Oh

70,000.00

35,000.00

Mandor

0.025 Oh

90,000.00

2,250.00

BAHAN Papan Kayu Tahun

0.060



7,848,000.00

Paku`1CM - 2,5CM

0.150

Kg

13,800.00

Jumlah

470,880.00 2,070.00 224,750.00

472,950.00

697,700.00

33 1 6.22

2

3

4

5

6

7

1 M² PASANG DAUN PINTU TEAKWOOD RANGKAP KAYU JATI TENAGA Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu jati

0.0250



19,687,000.00

Paku`

0.030

Kg

13,800.00

414.00

Lem Kayu

0.300

Kg

14,400.00

4,320.00

0.860

Lbr

126,700.00

Teakwood 4 mm (120x240)cm

Jumlah 6.23

492,175.00

108,962.00 247,100.00

605,871.00

852,971.00

1 M² PASANG DAUN PINTU TEAKWOOD RANGKAP KAYU KANPER TENAGA Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Kanper

0.0250



15,395,000.00

384,875.00

Paku`

0.030

Kg

13,800.00

414.00

Lem Kayu

0.300

Kg

14,400.00

4,320.00

Teakwood 4 mm (120x240)cm

0.860

Lbr

126,700.00

108,962.00

Jumlah 6.24

247,100.00

498,571.00

745,671.00

1 M² PASANG DAUN PINTU TEAKWOOD RANGKAP KAYU BALAU TENAGA Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Balau

0.0250



16,180,000.00

Paku`

0.030

Kg

13,800.00

414.00

Lem Kayu

0.300

Kg

14,400.00

4,320.00

0.860

Lbr

126,700.00

Teakwood 4 mm (120x240)cm

Jumlah 6.25

404,500.00

108,962.00 247,100.00

518,196.00

765,296.00

1 M² PASANG DAUN PINTU TEAKWOOD RANGKAP KAYU TAHUN TENAGA Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Tahun

0.0250



7,848,000.00

Paku`

0.030

Kg

13,800.00

414.00

Lem Kayu

0.300

Kg

14,400.00

4,320.00

0.860

Lbr

126,700.00

Teakwood 4 mm (120x240)cm

Jumlah 6.26

196,200.00

108,962.00 247,100.00

309,896.00

1 M² PASANG DAUN PINTU TEAKWOOD + FORMIKA KAYU JATI Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu jati

0.0250



19,687,000.00

492,175.00

556,996.00

34 1

2

3

4 13,800.00

6

7

0.030

Lem Kayu

0.800

Kg

14,400.00

11,520.00

Formika

0.500

Lbr

386,800.00

193,400.00

Teakwood 4 mm (120x240)cm

0.860

Lbr

126,700.00

108,962.00

Jumlah

Kg

5

Paku`

414.00

293,975.00

806,471.00

1,100,446.00

35 1 6.27

2

3

4

5

6

7

1 M² PASANG DAUN PINTU TEAKWOOD + FORMIKA KAYU KANPER TENAGA Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Kanper

0.0250



15,395,000.00

Paku`

0.030

Kg

13,800.00

414.00

Lem Kayu

0.800

Kg

14,400.00

11,520.00

Formika

0.500

Lbr

386,800.00

193,400.00

Teakwood 4 mm (120x240)cm

0.860

Lbr

126,700.00

Jumlah 6.28

384,875.00

108,962.00 293,975.00

699,171.00

993,146.00

1 M² PASANG DAUN PINTU TEAKWOOD + FORMIKA KAYU BALAU TENAGA Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Balau

0.0250



16,180,000.00

Paku`

0.030

Kg

13,800.00

414.00

Lem Kayu

0.800

Kg

14,400.00

11,520.00

Formika

0.500

Lbr

386,800.00

193,400.00

Teakwood 4 mm (120x240)cm

0.860

Lbr

126,700.00

Jumlah 6.29

404,500.00

108,962.00 293,975.00

718,796.00

1,012,771.00

1 M² PASANG DAUN PINTU TEAKWOOD + FORMIKA KAYU TAHUN TENAGA Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Tahun

0.0250



7,848,000.00

Paku`

0.030

Kg

13,800.00

414.00

Lem Kayu

0.800

Kg

14,400.00

11,520.00

Formika

0.500

Lbr

386,800.00

193,400.00

0.860

Lbr

126,700.00

Teakwood 4 mm (120x240)cm

Jumlah 6.30

196,200.00

108,962.00 293,975.00

510,496.00

804,471.00

1 M² PAS. DAUN PINTU TEAKWOOD LAPIS ALUMINIUM RANGKAP RANGKA KAYU JATI TENAGA Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Jati

0.0250



19,687,000.00

492,175.00

Paku`

0.030

Kg

13,800.00

414.00

Lem Kayu

1.200

Kg

14,400.00

17,280.00

Teakwood 4 mm (120x240)cm

0.860

Lbr

126,700.00

108,962.00

0.500

Lbr

118,300.00

Teakwood Aluminium

Jumlah 6.31

59,150.00 293,975.00

1 M² PAS. DAUN PINTU TEAKWOOD LAPIS ALUMINIUM RANGKAP RANGKA KAYU KANPER TENAGA Tukang

2.500 Oh

85,000.00

212,500.00

677,981.00

971,956.00

36 1

2

3

4

5

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

6

7

BAHAN Papan Kayu Kanper

0.0250



15,395,000.00

Paku`

0.030

Kg

13,800.00

414.00

Lem Kayu

1.200

Kg

14,400.00

17,280.00

Teakwood 4 mm (120x240)cm

0.860

Lbr

126,700.00

108,962.00

Teakwood Aluminium

0.500

Lbr

118,300.00

Jumlah

384,875.00

59,150.00 293,975.00

570,681.00

864,656.00

37 1 6.32

2

3

4

5

6

7

1 M² PAS. DAUN PINTU TEAKWOOD LAPIS ALUMINIUM RANGKAP RANGKA KAYU BALAU TENAGA Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Balau

0.0250



16,180,000.00

Paku`

0.030

Kg

13,800.00

414.00

Lem Kayu

1.200

Kg

14,400.00

17,280.00

Teakwood 4 mm (120x240)cm

0.860

Lbr

126,700.00

108,962.00

Teakwood Aluminium

0.500

Lbr

118,300.00

Jumlah 6.33

404,500.00

59,150.00 293,975.00

590,306.00

884,281.00

1 M² PAS. DAUN PINTU TEAKWOOD LAPIS ALUMINIUM RANGKAP RANGKA KAYU TAHUN TENAGA Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Tahun

0.0250



7,848,000.00

Paku`

0.030

Kg

13,800.00

414.00

Lem Kayu

1.200

Kg

14,400.00

17,280.00

Teakwood 4 mm (120x240)cm

0.860

Lbr

126,700.00

108,962.00

Teakwood Aluminium

0.500

Lbr

118,300.00

59,150.00

Jumlah

196,200.00

293,975.00

382,006.00

675,981.00

38 1

2

3

4

5

6

7

PEKERJAAN KAYU PEMBUATAN RANGKA ATAP RANGKA ATAP BAJA RINGAN 6.01

1 M² PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP ASBES/SPANDEK TENAGA Tukang

0.650

85,000.00

Kepala Tukang

0.010

87,500.00

55,250.00 875.00

Pekerja/Buruh tak terampil

0.225

70,000.00

15,750.00

Mandor

0.100

90,000.00

9,000.00

C-75 , 0.8

1.488

21,000.00

31,248.00

C-75 , 0.6

2.232

18,700.00

41,738.40

28.000

500.00

14,000.00

Dynabolt

1.600

5,100.00

8,160.00

Reng

3.600

10,300.00

37,080.00

Talang jurai

0.124

30,100.00

BAHAN

Baut (screw driver)

Jumlah 6.02

3,732.40 80,875.00

216,833.80

135,958.80

1 M² PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL TENAGA Tukang

0.650

85,000.00

55,250.00

Kepala Tukang

0.010

87,500.00

875.00

Pekerja/Buruh tak terampil

0.225

70,000.00

15,750.00

Mandor

0.100

90,000.00

9,000.00

C-75 , 0.8

1.488

21,000.00

31,248.00

C-75 , 0.6

2.232

18,700.00

41,738.40 19,000.00

BAHAN

Baut (screw driver)

38.000

500.00

Dynabolt

1.600

5,100.00

8,160.00

Reng

3.600

10,300.00

37,080.00

0.124

30,100.00

Talang jurai

Jumlah

3,732.40 80,875.00

140,958.80

221,833.80

PEKERJAAN KUDA - KUDA 6.1

1 M³ PAS. KONSTRUKSI KUDA-KUDA KAYU JATI TENAGA Tukang

12.000 Oh

85,000.00

1,020,000.00

Kepala Tukang

1.200 Oh

87,500.00

105,000.00

Pekerja/Buruh tak terampil

4.000 Oh

70,000.00

280,000.00

Mandor

0.200 Oh

90,000.00

18,000.00

BAHAN Kayu jati

1.100



19,018,000.00

20,919,800.00

Paku 12cm

5.600

Kg

13,800.00

77,280.00

15.000

Kg

20,800.00

Besi Plat Strip tebal 5mm

Jumlah 6.2

312,000.00 1,423,000.00

21,309,080.00

22,732,080.00

1 M³ PAS. KONSTRUKSI KUDA-KUDA KAYU BALAU TENAGA Tukang

12.000 Oh

85,000.00

1,020,000.00

Kepala Tukang

1.200 Oh

87,500.00

105,000.00

Pekerja/Buruh tak terampil

4.000 Oh

70,000.00

280,000.00

Mandor

0.200 Oh

90,000.00

18,000.00

BAHAN KayuBalau

1.100



15,286,000.00

16,814,600.00

Paku 12cm

5.600

Kg

13,800.00

77,280.00

15.000

Kg

20,800.00

Besi Plat Strip tebal 5mm

Jumlah

312,000.00 1,423,000.00

17,203,880.00

18,626,880.00

39 1 6.3

2

3

4

5

6

7

1 M³ PAS. KONSTRUKSI KUDA-KUDA KAYU KRUING TENAGA Tukang

12.000 Oh

85,000.00

1,020,000.00

Kepala Tukang

1.200 Oh

87,500.00

105,000.00

Pekerja/Buruh tak terampil

4.000 Oh

70,000.00

280,000.00

Mandor

0.200 Oh

90,000.00

18,000.00

BAHAN Kayu Kruing

1.100



9,780,000.00

Paku 12cm

5.600

Kg

13,800.00

77,280.00

15.000

Kg

20,800.00

312,000.00

Besi Plat Strip tebal 5mm

Jumlah

10,758,000.00

1,423,000.00

11,147,280.00

12,570,280.00

40 1 6.4

2

3

4

5

6

7

1 M³ PAS. KONSTRUKSI KUDA-KUDA KAYU MERANTI TENAGA Tukang

12.000 Oh

85,000.00

1,020,000.00

Kepala Tukang

1.200 Oh

87,500.00

105,000.00

Pekerja/Buruh tak terampil

4.000 Oh

70,000.00

280,000.00

Mandor

0.200 Oh

90,000.00

18,000.00

BAHAN Kayu Meranti

1.100



7,969,000.00

Paku 12cm

5.600

Kg

13,800.00

77,280.00

15.000

Kg

20,800.00

312,000.00

Besi Plat Strip tebal 5mm

Jumlah 6.5

8,765,900.00

1,423,000.00

9,155,180.00

10,578,180.00

1 M³ PAS. KONSTRUKSI KUDA-KUDA KAYU TAHUN TENAGA Tukang

12.000 Oh

85,000.00

1,020,000.00

Kepala Tukang

1.200 Oh

87,500.00

105,000.00

Pekerja/Buruh tak terampil

4.000 Oh

70,000.00

280,000.00

Mandor

0.200 Oh

90,000.00

18,000.00

BAHAN Kayu Tahun

1.100



7,486,000.00

Paku 12cm

5.600

Kg

13,800.00

77,280.00

15.000

Kg

20,800.00

312,000.00

Besi Plat Strip tebal 5mm

Jumlah 6.6

8,234,600.00

1,423,000.00

8,623,880.00

10,046,880.00

1 M³ ONGKOS PAS. KONSTRUKSI KUDA-KUDA LAMA TENAGA Tukang

12.000 Oh

85,000.00

1,020,000.00

Kepala Tukang

1.200 Oh

87,500.00

105,000.00

Pekerja/Buruh tak terampil

4.000 Oh

70,000.00

280,000.00

Mandor

0.200 Oh

90,000.00

Jumlah

18,000.00

1,423,000.00

1,423,000.00

PEKERJAAN GORDING 6.7

1 M³ PAS. KONSTRUKSI GORDING KAYU JATI TENAGA Tukang

7.200 Oh

85,000.00

Kepala Tukang

0.720 Oh

87,500.00

612,000.00 63,000.00

Pekerja/Buruh tak terampil

2.400 Oh

70,000.00

168,000.00

Mandor

0.120 Oh

90,000.00

10,800.00

BAHAN Kayu jati

1.100



19,018,000.00

Paku 12cm

3.000

Kg

13,800.00

41,400.00

15.000

Kg

20,800.00

312,000.00

Besi Plat Strip tebal 5mm

Jumlah 6.8

20,919,800.00

853,800.00

21,273,200.00

22,127,000.00

1 M³ PAS. KONSTRUKSI GORDING KAYU BALAU TENAGA Tukang

7.200 Oh

85,000.00

Kepala Tukang

0.720 Oh

87,500.00

612,000.00 63,000.00

Pekerja/Buruh tak terampil

2.400 Oh

70,000.00

168,000.00

Mandor

0.120 Oh

90,000.00

10,800.00

BAHAN KayuBalau

1.100



15,286,000.00

Paku 12cm

3.000

Kg

13,800.00

41,400.00

15.000

Kg

20,800.00

312,000.00

Besi Plat Strip tebal 5mm

Jumlah 6.9

16,814,600.00

853,800.00

1 M³ PAS. KONSTRUKSI GORDING KAYU KRUING TENAGA Tukang

7.200 Oh

85,000.00

612,000.00

17,168,000.00

18,021,800.00

41 1

2

3

4

5

Kepala Tukang

0.720 Oh

87,500.00

63,000.00

Pekerja/Buruh tak terampil

2.400 Oh

70,000.00

168,000.00

Mandor

0.120 Oh

90,000.00

10,800.00

6

7

BAHAN Kayu Kruing

1.100



9,780,000.00

Paku 12cm

3.000

Kg

13,800.00

41,400.00

15.000

Kg

20,800.00

312,000.00

Besi Plat Strip tebal 5mm

Jumlah

10,758,000.00

853,800.00

11,111,400.00

11,965,200.00

42 1 6.10

2

3

4

5

6

7

1 M³ PAS. KONSTRUKSI GORDING KAYU MERANTI TENAGA Tukang

7.200 Oh

85,000.00

612,000.00

Kepala Tukang

0.720 Oh

87,500.00

63,000.00

Pekerja/Buruh tak terampil

2.400 Oh

70,000.00

168,000.00

Mandor

0.120 Oh

90,000.00

10,800.00

BAHAN Kayu Meranti

1.100



7,969,000.00

Paku 12cm

3.000

Kg

13,800.00

41,400.00

15.000

Kg

20,800.00

312,000.00

Besi Plat Strip tebal 5mm

Jumlah 6.11

8,765,900.00

853,800.00

9,119,300.00

9,973,100.00

1 M³ PAS. KONSTRUKSI GORDING KAYU TAHUN TENAGA Tukang

7.200 Oh

85,000.00

612,000.00

Kepala Tukang

0.720 Oh

87,500.00

63,000.00

Pekerja/Buruh tak terampil

2.400 Oh

70,000.00

168,000.00

Mandor

0.120 Oh

90,000.00

10,800.00

BAHAN Kayu Tahun

1.100



7,486,000.00

Paku 12cm

3.000

Kg

13,800.00

41,400.00

15.000

Kg

20,800.00

312,000.00

Besi Plat Strip tebal 5mm

Jumlah 6.12

8,234,600.00

853,800.00

8,588,000.00

9,441,800.00

1 M³ ONGKOS PAS. KONSTRUKSI GORDING LAMA TENAGA Tukang

7.200 Oh

85,000.00

612,000.00

Kepala Tukang

0.720 Oh

87,500.00

63,000.00

Pekerja/Buruh tak terampil

2.400 Oh

70,000.00

168,000.00

Mandor

0.120 Oh

90,000.00

10,800.00

3.000

13,800.00

BAHAN Paku 12cm

Kg

Jumlah

41,400.00 853,800.00

41,400.00

895,200.00

PEKERJAAN KASO + RENG 6.13

1 M² PAS. KASO + RENG KAYU ( JATI - JATI) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Jati

0.010



19,018,000.00

190,180.00

Reng Kayu Jati

0.003



19,018,000.00

57,054.00

Paku 5 - 10cm

0.150

Kg

13,800.00

Jumlah 6.14

2,070.00 16,825.00

249,304.00

266,129.00

1 M² PAS. KASO + RENG KAYU (BALAU - BALAU) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Balau

0.010



15,286,000.00

152,860.00

Reng Kayu Balau

0.003



15,286,000.00

45,858.00

Paku 5 - 10cm

0.150

Kg

13,800.00

Jumlah 6.15

1 M² PAS. KASO + RENG KAYU ( BALAUI - JATI)

2,070.00 16,825.00

200,788.00

217,613.00

43 1

2

3

4

5

6

7

TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Balau

0.010



15,286,000.00

152,860.00

Reng Kayu Jati

0.003



19,018,000.00

57,054.00

Paku 5 - 10cm

0.150

Kg

13,800.00

Jumlah

2,070.00 16,825.00

211,984.00

228,809.00

44 1 6.16

2

3

4

5

6

7

1 M² PAS. KASO + RENG KAYU ( KRUING - JATI) TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Kruing

0.010



9,780,000.00

97,800.00

Reng Kayu Jati

0.003



19,018,000.00

57,054.00

Paku 5 - 10cm

0.150

Kg

13,800.00

2,070.00

Jumlah 6.17

16,825.00

156,924.00

173,749.00

1 M² PAS. KASO + RENG KAYU ( KRUING - BALAU ) TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Kruing

0.010



9,780,000.00

97,800.00

Reng Kayu Balau

0.003



15,286,000.00

45,858.00

Paku 5 - 10cm

0.150

Kg

13,800.00

2,070.00

Jumlah 6.18

16,825.00

145,728.00

162,553.00

1 M² PAS. KASO + RENG KAYU ( KRUING - TAHUN ) TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Kruing

0.010



9,780,000.00

97,800.00

Reng Kayu Tahun

0.003



7,486,000.00

22,458.00

0.150

Kg

13,800.00

Paku 5 - 10cm

Jumlah 6.19

2,070.00 16,825.00

122,328.00

139,153.00

1 M² PAS. KASO + RENG KAYU ( MERANTI - JATI) TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Meranti

0.010



7,969,000.00

79,690.00

Reng Kayu Jati

0.003



19,018,000.00

57,054.00

0.150

Kg

13,800.00

Paku 5 - 10cm

Jumlah 6.20

2,070.00 16,825.00

138,814.00

155,639.00

1 M² PAS. KASO + RENG KAYU ( TAHUN - JATI) TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Tahun

0.010



7,486,000.00

74,860.00

Reng Kayu Jati

0.003



19,018,000.00

57,054.00

0.150

Kg

13,800.00

Paku 5 - 10cm

Jumlah

2,070.00 16,825.00

133,984.00

150,809.00

45 1 6.21

2

3

4

5

6

7

1 M² PAS. KASO + RENG KAYU ( TAHUN - TAHUN) TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Tahun

0.010



7,486,000.00

74,860.00

Reng Kayu Tahun

0.003



7,486,000.00

22,458.00

Paku 5 - 10cm

0.150

Kg

13,800.00

2,070.00

Jumlah

16,825.00

99,388.00

116,213.00

46 1 6.22

2

3

4

5

6

7

1 M² PAS. KASO LAMA + RENG BARU KAYU JATI TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Reng Kayu Jati

0.003



19,018,000.00

Paku 5 - 10cm

0.150

Kg

13,800.00

Jumlah 6.23

57,054.00 2,070.00 16,825.00

59,124.00

75,949.00

1 M² PAS. KASO LAMA + RENG BARU KAYU BALAU TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Reng Kayu Balau

0.003



15,286,000.00

Paku 5 - 10cm

0.150

Kg

13,800.00

Jumlah 6.24

45,858.00 2,070.00 16,825.00

47,928.00

64,753.00

1 M² PAS. KASO LAMA + RENG BARU KAYU TAHUN TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Reng Kayu Tahun

0.003



7,486,000.00

Paku 5 - 10cm

0.150

Kg

13,800.00

Jumlah 6.25

22,458.00 2,070.00 16,825.00

24,528.00

41,353.00

1 M² PAS. KASO + RENG ATAP SIRAP KAYU ( JATI - JATI) TENAGA Tukang

0.120 Oh

85,000.00

10,200.00

Kepala Tukang

0.012 Oh

87,500.00

1,050.00

Pekerja/Buruh tak terampil

0.120 Oh

70,000.00

8,400.00

Mandor

0.006 Oh

90,000.00

540.00

BAHAN Kaso Kayu JATI

0.007



19,018,000.00

133,126.00

Reng Kayu JATI

0.006



19,018,000.00

114,108.00

Paku 5 - 10cm

0.150

Kg

13,800.00

Jumlah 6.26

2,070.00 20,190.00

249,304.00

269,494.00

1 M² PAS. KASO + RENG ATAP SIRAP KAYU ( BALAU - JATI) TENAGA Tukang

0.120 Oh

85,000.00

10,200.00

Kepala Tukang

0.012 Oh

87,500.00

1,050.00

Pekerja/Buruh tak terampil

0.120 Oh

70,000.00

8,400.00

Mandor

0.006 Oh

90,000.00

540.00

BAHAN Kaso Kayu BALAU

0.007



15,286,000.00

107,002.00

Reng Kayu JATI

0.006



19,018,000.00

114,108.00

Paku 5 - 10cm

0.150

Kg

13,800.00

Jumlah 6.27

2,070.00 20,190.00

1 M² PAS. KASO + RENG ATAP SIRAP KAYU ( KAMPER - JATI) TENAGA Tukang

0.120 Oh

85,000.00

10,200.00

223,180.00

243,370.00

47 1

2

3

4

5

6

Kepala Tukang

0.012 Oh

87,500.00

1,050.00

Pekerja/Buruh tak terampil

0.120 Oh

70,000.00

8,400.00

Mandor

0.006 Oh

90,000.00

540.00

7

BAHAN Kaso Kayu KAMPER

0.007



15,093,000.00

105,651.00

Reng Kayu JATI

0.006



19,018,000.00

114,108.00

Paku 5 - 10cm

0.150

Kg

13,800.00

Jumlah

2,070.00 20,190.00

221,829.00

242,019.00

48 1 6.28

2

3

4

5

6

7

1 M² PAS. KASO + RENG ATAP SIRAP KAYU ( KRUING - JATI) TENAGA Tukang

0.120 Oh

85,000.00

10,200.00

Kepala Tukang

0.012 Oh

87,500.00

1,050.00

Pekerja/Buruh tak terampil

0.120 Oh

70,000.00

8,400.00

Mandor

0.006 Oh

90,000.00

540.00

BAHAN Kaso Kayu KRUING

0.007



9,780,000.00

68,460.00

Reng Kayu JATI

0.006



19,018,000.00

114,108.00

Paku 5 - 10cm

0.150

Kg

13,800.00

2,070.00

Jumlah 6.29

20,190.00

184,638.00

204,828.00

1 M² PAS. KASO + RENG ATAP SIRAP KAYU ( MERANTI - JATI) TENAGA Tukang

0.120 Oh

85,000.00

10,200.00

Kepala Tukang

0.012 Oh

87,500.00

1,050.00

Pekerja/Buruh tak terampil

0.120 Oh

70,000.00

8,400.00

Mandor

0.006 Oh

90,000.00

540.00

BAHAN Kaso Kayu MERANTI

0.007



7,969,000.00

55,783.00

Reng Kayu JATI

0.006



19,018,000.00

114,108.00

Paku 5 - 10cm

0.150

Kg

13,800.00

2,070.00

Jumlah 6.30

20,190.00

171,961.00

192,151.00

1 M² PAS. KASO + RENG ATAP GNT BETON KAYU ( BALAU - JATI) TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu BALAU

0.010



15,286,000.00

152,860.00

Reng Kayu JATI

0.006



19,018,000.00

114,108.00

0.150

Kg

13,800.00

Paku 5 - 10cm

Jumlah 6.31

2,070.00 16,825.00

269,038.00

285,863.00

1 M² PAS. KASO + RENG ATAP GNT BETON KAYU ( KRUING - JATI) TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu KRUING

0.010



9,780,000.00

97,800.00

Reng Kayu JATI

0.006



19,018,000.00

114,108.00

0.150

Kg

13,800.00

Paku 5 - 10cm

Jumlah 6.32

2,070.00 16,825.00

213,978.00

230,803.00

1 M² PAS. KASO + RENG ATAP GNT BETON KAYU ( MERANTI - JATI) TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu MERANTI

0.010



7,969,000.00

79,690.00

Reng Kayu JATI

0.006



19,018,000.00

114,108.00

0.150

Kg

13,800.00

Paku 5 - 10cm

Jumlah

2,070.00 16,825.00

195,868.00

212,693.00

49 1 6.33

2

3

4

5

6

7

1 M² PAS. KASO + RENG ATAP GNT BETON KAYU ( TAHUN - JATI) TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Tahun

0.010



7,486,000.00

74,860.00

Reng Kayu Jati

0.006



19,018,000.00

114,108.00

Paku 5 - 10cm

0.150

Kg

13,800.00

2,070.00

Jumlah

16,825.00

191,038.00

207,863.00

50 1

2

3

4

5

6

7

PEKERJAAN RANGKA LANGIT - LANGIT 6.34

1 M² PAS. RANGKA LANGIT - LANGIT ( 50X100 )KAYU JATI TENAGA Tukang

0.250 Oh

85,000.00

21,250.00

Kepala Tukang

0.025 Oh

87,500.00

2,187.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.075 Oh

90,000.00

6,750.00

BAHAN Kaso Kayu Jati Paku

0.0154



19,018,000.00

292,877.20

0.200

Kg

13,800.00

2,760.00

Jumlah 6.35

40,687.50

295,637.20

336,324.70

1 M² PAS. RANGKA LANGIT - LANGIT ( 50X100 )KAYU KANPER TENAGA Tukang

0.250 Oh

85,000.00

21,250.00

Kepala Tukang

0.025 Oh

87,500.00

2,187.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.075 Oh

90,000.00

6,750.00

BAHAN Kaso Kayu Kamper Paku

0.0154



15,093,000.00

0.200

Kg

13,800.00

Jumlah 6.36

232,432.20 2,760.00 40,687.50

235,192.20

275,879.70

1 M² PAS. RANGKA LANGIT - LANGIT ( 50X100 ) KAYU KRUING TENAGA Tukang

0.250 Oh

85,000.00

Kepala Tukang

0.025 Oh

87,500.00

21,250.00 2,187.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.075 Oh

90,000.00

6,750.00

BAHAN Kaso Kayu Kruing Paku

0.0154



9,780,000.00

0.200

Kg

13,800.00

Jumlah 6.37

150,612.00 2,760.00 40,687.50

153,372.00

194,059.50

1 M² PAS. RANGKA LANGIT - LANGIT ( 50X100 ) KAYU MERANTI TENAGA Tukang

0.250 Oh

85,000.00

Kepala Tukang

0.025 Oh

87,500.00

21,250.00 2,187.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.075 Oh

90,000.00

6,750.00

BAHAN Kaso Kayu Meranti Paku

0.0154



7,969,000.00

0.200

Kg

13,800.00

Jumlah 6.38

122,722.60 2,760.00 40,687.50

125,482.60

166,170.10

1 M² PAS. RANGKA LANGIT - LANGIT ( 50X100 ) KAYU TAHUN TENAGA Tukang

0.250 Oh

85,000.00

Kepala Tukang

0.025 Oh

87,500.00

21,250.00 2,187.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.075 Oh

90,000.00

6,750.00

BAHAN Kaso Kayu Tahun Paku

0.0154



7,486,000.00

0.200

Kg

13,800.00

Jumlah 6.39

115,284.40 2,760.00 40,687.50

1 M² ONGKOS PAS. RANGKA LANGIT - LANGIT ( 50X100 ) KAYU LAMA TENAGA Tukang

0.250 Oh

85,000.00

21,250.00

Kepala Tukang

0.025 Oh

87,500.00

2,187.50

118,044.40

158,731.90

51 1

2

3

4

5

6

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.075 Oh

90,000.00

6,750.00

0.200

13,800.00

7

BAHAN Paku

Kg

Jumlah 6.40

2,760.00 40,687.50

2,760.00

43,447.50

1 M² PAS. RANGKA LANGIT - LANGIT ( 60 x 60 )KAYU JATI TENAGA Tukang

0.300 Oh

85,000.00

Kepala Tukang

0.030 Oh

87,500.00

25,500.00 2,625.00

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

BAHAN Kaso Kayu Jati Paku

0.0163



19,018,000.00

0.250

Kg

13,800.00

Jumlah

309,993.40 3,450.00 43,025.00

313,443.40

356,468.40

52 1 6.41

2

3

4

5

6

7

1 M² PAS. RANGKA LANGIT - LANGIT ( 60 x 60 )KAYU KANPER TENAGA Tukang

0.300 Oh

85,000.00

25,500.00

Kepala Tukang

0.030 Oh

87,500.00

2,625.00

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

BAHAN Kaso Kayu Kamper Paku

0.0163



15,093,000.00

0.250

Kg

13,800.00

Jumlah 6.42

246,015.90 3,450.00 43,025.00

249,465.90

292,490.90

1 M² PAS. RANGKA LANGIT - LANGIT ( 60 x 60 ) KAYU KRUING TENAGA Tukang

0.300 Oh

85,000.00

Kepala Tukang

0.030 Oh

87,500.00

25,500.00 2,625.00

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

BAHAN Kaso Kayu Kruing Paku

0.0163



9,780,000.00

0.250

Kg

13,800.00

Jumlah 6.43

159,414.00 3,450.00 43,025.00

162,864.00

205,889.00

1 M² PAS. RANGKA LANGIT - LANGIT ( 60 x 60 ) KAYU MERANTI TENAGA Tukang

0.300 Oh

85,000.00

Kepala Tukang

0.030 Oh

87,500.00

25,500.00 2,625.00

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

BAHAN Kaso Kayu Meranti Paku

0.0163



7,969,000.00

0.250

Kg

13,800.00

Jumlah 6.44

129,894.70 3,450.00 43,025.00

133,344.70

176,369.70

1 M² PAS. RANGKA LANGIT - LANGIT ( 60 x 60 ) KAYU TAHUN TENAGA Tukang

0.300 Oh

85,000.00

Kepala Tukang

0.030 Oh

87,500.00

25,500.00 2,625.00

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

BAHAN Kaso Kayu Tahun Paku

0.0163



7,486,000.00

0.250

Kg

13,800.00

Jumlah 6.45

122,021.80 3,450.00 43,025.00

125,471.80

168,496.80

1 M² ONGKOS PAS. RANGKA LANGIT - LANGIT ( 60 x 60 ) KAYU LAMA TENAGA Tukang

0.300 Oh

85,000.00

Kepala Tukang

0.030 Oh

87,500.00

25,500.00 2,625.00

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

0.250

13,800.00

BAHAN Paku

Kg

Jumlah

3,450.00 43,025.00

PEKERJAAN LISPLANK 6.46

1 M' PAS. LISPLANK ( 3 X 20 ) KAYU JATI TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

3,450.00

46,475.00

53 1

2

3

4

5

6

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

7

BAHAN Papan Kayu jati Paku`

0.0072



19,687,000.00

0.050

Kg

13,800.00

Jumlah 6.47

141,746.40 690.00 26,200.00

142,436.40

168,636.40

1 M' PAS. LISPLANK ( 3 X 20 ) KAYU KANPER TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Kanper Paku`

0.0072



15,395,000.00

110,844.00

0.050

Kg

13,800.00

690.00

Jumlah

26,200.00

111,534.00

137,734.00

54 1 6.48

2

3

4

5

6

7

1 M' PAS. LISPLANK ( 3 X 20 ) KAYU BALAU TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Balau

0.0072



16,180,000.00

0.050

Kg

13,800.00

Paku`

Jumlah 6.49

116,496.00 690.00 26,200.00

117,186.00

143,386.00

1 M' PAS. LISPLANK ( 3 X 20 ) KAYU KRUING TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Kruing

0.0072



10,263,000.00

0.050

Kg

13,800.00

Paku`

Jumlah 6.50

73,893.60 690.00 26,200.00

74,583.60

100,783.60

1 M' PAS. LISPLANK ( 3 X 20 ) KAYU TAHUN TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Tahun Paku`

0.0072



7,848,000.00

0.050

Kg

13,800.00

Jumlah 6.51

56,505.60 690.00 26,200.00

57,195.60

83,395.60

1 M' ONGKOS PAS. LISPLANK ( 3 X 20 ) KAYU LAMA TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

0.050

13,800.00

BAHAN Paku`

Kg

Jumlah 6.52

690.00 26,200.00

690.00

26,890.00

1 M' PAS. LISPLANK ( 3 X 30 ) KAYU JATI TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu jati

0.011



19,687,000.00

216,557.00

Paku`

0.050

Kg

13,800.00

690.00

Jumlah 6.53

26,200.00

1 M' PAS. LISPLANK ( 3 X 30 ) KAYU KANPER TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

217,247.00

243,447.00

55 1

2

3

4

5

6

7

BAHAN Papan Kayu Kanper

0.011



15,395,000.00

Paku`

0.050

Kg

13,800.00

Jumlah 6.54

169,345.00 690.00 26,200.00

170,035.00

196,235.00

1 M' PAS. LISPLANK ( 3 X 30 ) KAYU BALAU TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Balau

0.011



16,180,000.00

Paku`

0.050

Kg

13,800.00

Jumlah

177,980.00 690.00 26,200.00

178,670.00

204,870.00

56 1 6.55

2

3

4

5

6

7

1 M' PAS. LISPLANK ( 3 X 30 ) KAYU KRUING TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Kruing

0.011



10,263,000.00

Paku`

0.050

Kg

13,800.00

Jumlah 6.56

112,893.00 690.00 26,200.00

113,583.00

139,783.00

1 M' PAS. LISPLANK ( 3 X 30 ) KAYU TAHUN TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Tahun

0.011



7,848,000.00

Paku`

0.050

Kg

13,800.00

Jumlah 6.57

86,328.00 690.00 26,200.00

87,018.00

113,218.00

1 M' ONGKOS PAS. LISPLANK ( 3 X 30 ) KAYU LAMA TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

0.050

13,800.00

BAHAN Paku`

Kg

Jumlah 6.58

690.00 26,200.00

690.00

26,890.00

1 M' PAS. LISPLANK ( 2 X 2 X 20 ) KAYU JATI TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.050 Oh

90,000.00

4,500.00

BAHAN Papan Kayu jati Paku`

0.0086



19,687,000.00

0.0600

Kg

13,800.00

Jumlah 6.59

169,308.20 828.00 20,875.00

170,136.20

191,011.20

1 M' PAS. LISPLANK ( 2 X 2 X 20 ) KAYU KANPER TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.050 Oh

90,000.00

4,500.00

BAHAN Papan Kayu Kanper

0.0086



15,395,000.00

132,397.00

Paku`

0.0600

Kg

13,800.00

828.00

Jumlah 6.60

20,875.00

1 M' PAS. LISPLANK ( 2 X 2 X 20 ) KAYU BALAU TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.050 Oh

90,000.00

4,500.00

133,225.00

154,100.00

57 1

2

3

4

5

6

7

BAHAN Papan Kayu Balau

0.0086



16,180,000.00

Paku`

0.0600

Kg

13,800.00

Jumlah 6.61

139,148.00 828.00 20,875.00

139,976.00

160,851.00

1 M' PAS. LISPLANK ( 2 X 2 X 20 ) KAYU KRUING TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.050 Oh

90,000.00

4,500.00

BAHAN Papan Kayu Kruing

0.0086



10,263,000.00

Paku`

0.0600

Kg

13,800.00

Jumlah

88,261.80 828.00 20,875.00

89,089.80

109,964.80

58 1 6.62

2

3

4

5

6

7

1 M' PAS. LISPLANK ( 2 X 2 X 20 ) KAYU TAHUN TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.050 Oh

90,000.00

4,500.00

BAHAN Papan Kayu Tahun

0.0086



7,848,000.00

Paku`

0.0600

Kg

13,800.00

Jumlah 6.63

67,492.80 828.00 20,875.00

68,320.80

89,195.80

1 M PAS. RANGKA DINDING PEMISAH ( 60x120 ) KAYU JATI 2

TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Kaso Kayu Jati

0.0280



19,018,000.00

Paku`

0.1500

Kg

13,800.00

Jumlah 6.64

532,504.00 2,070.00 53,407.50

534,574.00

587,981.50

1 M2 PAS. RANGKA DINDING PEMISAH ( 60x120 ) KAYU KAMPER TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Kaso Kayu Kamper

0.0280



15,093,000.00

Paku`

0.1500

Kg

13,800.00

Jumlah 6.65

422,604.00 2,070.00 53,407.50

424,674.00

478,081.50

1 M2 PAS. RANGKA DINDING PEMISAH ( 60x120 ) KAYU KRUING TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Kaso Kayu Kruing

0.0280



9,780,000.00

Paku`

0.1500

Kg

13,800.00

Jumlah 6.66

273,840.00 2,070.00 53,407.50

275,910.00

329,317.50

1 M2 PAS. RANGKA DINDING PEMISAH ( 60x120 ) KAYU MERANTI TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Kaso Kayu Meranti Paku`

0.0280



7,969,000.00

0.1500

Kg

13,800.00

Jumlah 6.67

223,132.00 2,070.00 53,407.50

1 M2 PAS. RANGKA DINDING PEMISAH ( 60x120 ) KAYU TAHUN TENAGA Tukang

0.450 Oh

85,000.00

38,250.00

Kepala Tukang

0.045 Oh

87,500.00

3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

225,202.00

278,609.50

59 1

2 Mandor

3

4

0.008 Oh

90,000.00

5

6

7

720.00

BAHAN Kaso Kayu Tahun

0.0280



7,486,000.00

209,608.00

Paku`

0.1500

Kg

13,800.00

2,070.00

Jumlah 6.68

53,407.50

211,678.00

265,085.50

1 M PAS. RANGKA DINDING PEMISAH TEAKWOOD RANGKAP KAYU JATI 2

TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Balok Kayu Jati 6/12

0.0280



19,018,000.00

Lem Kayu

0.5600

kg

14,400.00

8,064.00

Teakwood 4 mm (120x240)cm

0.8600

Lbr

126,700.00

108,962.00

0.1500

Kg

13,800.00

Paku`

Jumlah

532,504.00

2,070.00 53,407.50

651,600.00

705,007.50

60 1 6.69

2

3

4

5

6

7

1 M2 PAS. RANGKA DINDING PEMISAH TEAKWOOD RANGKAP KAYU KAMPER TENAGA Tukang

0.450 Oh

85,000.00

38,250.00

Kepala Tukang

0.045 Oh

87,500.00

3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Balok Kayu Kamper 6/12

0.0280



15,093,000.00

Lem Kayu

0.5600

kg

14,400.00

8,064.00

Teakwood 4 mm (120x240)cm

0.8600

Lbr

126,700.00

108,962.00

0.1500

Kg

13,800.00

Paku`

Jumlah 6.70

422,604.00

2,070.00 53,407.50

541,700.00

595,107.50

1 M2 PAS. RANGKA DINDING PEMISAH TEAKWOOD RANGKAP KAYU KRUING TENAGA Tukang

0.450 Oh

85,000.00

38,250.00

Kepala Tukang

0.045 Oh

87,500.00

3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Balok Kayu Kruing 6/12

0.0280



9,780,000.00

273,840.00

Lem Kayu

0.5600

kg

14,400.00

8,064.00

Teakwood 4 mm (120x240)cm

0.8600

Lbr

126,700.00

108,962.00

Paku`

0.1500

Kg

13,800.00

Jumlah 6.71

2,070.00 53,407.50

392,936.00

446,343.50

1 M2 PAS. RANGKA DINDING PEMISAH TEAKWOOD RANGKAP KAYU MERANTI TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Balok Kayu Meranti 6/12

0.0280



7,969,000.00

Lem Kayu

0.5600

kg

14,400.00

8,064.00

Teakwood 4 mm (120x240)cm

0.8600

Lbr

126,700.00

108,962.00

0.1500

Kg

13,800.00

Paku`

Jumlah 6.72

223,132.00

2,070.00 53,407.50

342,228.00

395,635.50

1 M2 PAS. RANGKA DINDING PEMISAH TEAKWOOD RANGKAP KAYU TAHUN TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Balok Kayu Tahun 6/12

0.0280



7,486,000.00

Lem Kayu

0.5600

kg

14,400.00

8,064.00

Teakwood 4 mm (120x240)cm

0.8600

Lbr

126,700.00

108,962.00

0.1500

Kg

13,800.00

Paku`

Jumlah 6.73

209,608.00

2,070.00 53,407.50

1 M' PAS. LIST ETERNIT TENAGA Tukang

0.050 Oh

85,000.00

Kepala Tukang

0.005 Oh

87,500.00

437.50

Pekerja/Buruh tak terampil

0.050 Oh

70,000.00

3,500.00

Mandor

0.003 Oh

90,000.00

270.00

BAHAN

4,250.00

328,704.00

382,111.50

61 1

2 List Eternit Paku

3

4

1.050

M'

4,800.00

0.010

kg

13,800.00

Jumlah 6.74

5

6

7

5,040.00 138.00 8,457.50

5,178.00

13,635.50

1 M' PAS. LIST PLAFOND KAYU PROFIL TENAGA Tukang

0.050 Oh

85,000.00

Kepala Tukang

0.005 Oh

87,500.00

4,250.00 437.50

Pekerja/Buruh tak terampil

0.050 Oh

70,000.00

3,500.00

Mandor

0.003 Oh

90,000.00

270.00

BAHAN Kayu List Profil

1.050

M'

9,600.00

Paku

0.010

kg

13,800.00

Jumlah

10,080.00 138.00 8,457.50

10,218.00

18,675.50

62 1 6.75

2

3

4

5

6

7

1 M' PAS. LIST PLAFOND GYBSUM KECIL TENAGA Tukang

0.050 Oh

85,000.00

4,250.00

Kepala Tukang

0.005 Oh

87,500.00

437.50

Pekerja/Buruh tak terampil

0.050 Oh

70,000.00

3,500.00

Mandor

0.003 Oh

90,000.00

270.00

BAHAN List Gypsum Kecil

1.050

M'

9,600.00

Paku

0.010

kg

13,800.00

Jumlah 6.76

10,080.00 138.00 8,457.50

10,218.00

18,675.50

1 M' PAS. LIST PLAFOND GYBSUM BESAR TENAGA Tukang

0.050 Oh

85,000.00

Kepala Tukang

0.005 Oh

87,500.00

4,250.00 437.50

Pekerja/Buruh tak terampil

0.050 Oh

70,000.00

3,500.00

Mandor

0.003 Oh

90,000.00

270.00

List Gypsum Besar

1.050

M'

15,000.00

15,750.00

Paku

0.010

kg

13,800.00

138.00

BAHAN

Jumlah

8,457.50

15,888.00

24,345.50

63 1

2

3

4

5

6

7

PEKERJAAN BETONAN 6.4

1 M³ MEMBUAT LANTAI KERJA BETON MUTU K 100 TENAGA Tukang

0.200 Oh

85,000.00

Kepala Tukang

0.020 Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

1.200 Oh

70,000.00

84,000.00

Mandor

0.006 Oh

90,000.00

540.00

BAHAN Semen abu-abu / PC

230.00

Kg

1,386.00

318,780.00

Pasir Brantas (beton)

0.640



276,400.00

176,896.00

Koral Beton Split 1 - 2 cm

0.760



353,800.00

Jumlah 6.5

268,888.00 103,290.00

764,564.00

867,854.00

1 M³ MEMBUAT BETON MUTU K 175 TENAGA Tukang

0.250 Oh

85,000.00

Kepala Tukang

0.025 Oh

87,500.00

21,250.00 2,187.50

Pekerja/Buruh tak terampil

1.650 Oh

70,000.00

115,500.00

Mandor

0.080 Oh

90,000.00

7,200.00

BAHAN Semen abu-abu / PC

326.00

Kg

1,386.00

451,836.00

Pasir Brantas (beton)

0.540



276,400.00

149,256.00

Koral Beton Split 1 - 2 cm

0.760



353,800.00

Jumlah I.2 (BOW)

268,888.00 146,137.50

869,980.00

1,016,117.50

100 KG MENGERJAKAN BESI BETON 10% BETON HILANG TENAGA Tukang besi

6.7500

Oh

85,000.00

573,750.00

Kepala Tukang

2.2500

Oh

87,500.00

196,875.00

Pekerja

6.7500

Oh

70,000.00

472,500.00

110.00

Kg

12,100.00

2.0000

Kg

16,900.00

BAHAN Kg Besi Beton Kg Kawat Tali (blendrat)

Jumlah F.7

1,331,000.00 33,800.00 1,243,125.00

1,364,800.00

2,607,925.00

10 M² MEMBUAT BEKISTING LANTAI TENAGA Tukang

3.300 Oh

85,000.00

280,500.00

Kepala Tukang

0.330 Oh

87,500.00

28,875.00

Pekerja/Buruh tak terampil

3.200 Oh

70,000.00

224,000.00

Mandor

0.060 Oh

90,000.00

5,400.00

BAHAN Kayu Tahun

0.40



2,415,000.00

966,000.00

Minyak Begisting

2.00

Ltr

31,300.00

62,600.00

0.15

Balok Kayu Tahun

M3

7,486,000.00

1,122,900.00

Bambu P : 4m

60.00 Btg

21,400.00

1,284,000.00

Paku

4.000

Kg

13,800.00

55,200.00

Teakwood (120x240)cm

3.500

Lbr

126,700.00

443,450.00

Jumlah F.8

538,775.00

10 M² MEMBUAT BEKISTING TENAGA Tukang

5.000 Oh

85,000.00

425,000.00

Kepala Tukang

0.500 Oh

87,500.00

43,750.00

Pekerja/Buruh tak terampil

2.000 Oh

Mandor

0.100 Oh

90,000.00

9,000.00

Pekerja/Buruh tak terampil

6.000 Oh

70,000.00

420,000.00

3,934,150.00

4,472,925.00

64 1

2

3

4

5

6

7

BAHAN Kayu Tahun Paku

0.40



2,415,000.00

4.000

Kg

13,800.00

Jumlah I

966,000.00 55,200.00 897,750.00

1,021,200.00

1,918,950.00

1,016,117.50 2,607,925.00 4,472,925.00 8,096,967.50

1 M ³ BETON BERTULANG UNTUK LANTAI MENGGUANAKAN BESI 100 Kg

6.5

1 M³ MEMBUAT BETON 1 Pc ; 2 Psr ; 3 Kr

I.2

100 KG MENGERJAKAN BESI BETON

F.7

10 M² MEMBUAT BEKISTING Jumlah

146,137.50

869,980.00

1,243,125.00

1,364,800.00

538,775.00

3,934,150.00

1,928,037.50

6,168,930.00

65 1 II

2

3

4

5

6

7

1 M ³ BETON BERTULANG MENGGUANAKAN BESI 100 Kg

6.5

1 M³ MEMBUAT BETON 1 Pc ; 2 Psr ; 3 Kr

I.2

100 KG MENGERJAKAN BESI BETON

F.8

10 M² MEMBUAT BEKISTING Jumlah

III

146,137.50

869,980.00

1,243,125.00

1,364,800.00

897,750.00

1,021,200.00

2,287,012.50

3,255,980.00

1,016,117.50 2,607,925.00 1,918,950.00 5,542,992.50

1 M ³ BETON BERTULANG MENGGUANAKAN BESI 130 Kg

6.5

1 M³ MEMBUAT BETON 1 Pc ; 2 Psr ; 3 Kr

I.2

130 KG MENGERJAKAN BESI BETON

F.8

10 M² MEMBUAT BEKISTING Jumlah

IV

146,137.50

869,980.00

1,616,062.50

1,774,240.00

897,750.00

1,021,200.00

2,659,950.00

3,665,420.00

1,016,117.50 3,390,302.50 1,918,950.00 6,325,370.00

1 M ³ BETON BERTULANG MENGGUANAKAN BESI 160 Kg

6.5

1 M³ MEMBUAT BETON 1 Pc ; 2 Psr ; 3 Kr

I.2

160 KG MENGERJAKAN BESI BETON

F.8

10 M² MEMBUAT BEKISTING

( I.2 X 1.6 ) Jumlah

V

146,137.50

869,980.00

1,989,000.00

2,183,680.00

897,750.00

1,021,200.00

3,032,887.50

4,074,860.00

1,016,117.50 4,172,680.00 1,918,950.00 7,107,747.50

1 M ³ BETON BERTULANG MENGGUANAKAN BESI 200 Kg

6.5

1 M³ MEMBUAT BETON 1 Pc ; 2 Psr ; 3 Kr

I.2

200 KG MENGERJAKAN BESI BETON

F.8

10 M² MEMBUAT BEKISTING

( I.2 X 2 ) Jumlah

146,137.50

869,980.00

2,486,250.00

2,729,600.00

897,750.00

1,021,200.00

3,530,137.50

4,620,780.00

1,016,117.50 5,215,850.00 1,918,950.00 8,150,917.50

66 1

2

3

4

5

6

7

PEKERJAAN PENUTUP ATAP PEKERJAAN PENUTUP ATAP GENTENG 6.1

1 M² PAS. GENTENG PRES BIASA TENAGA Tukang

0.075 Oh

85,000.00

6,375.00

Kepala Tukang

0.008 Oh

87,500.00

700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Genteng Pres

25.000

Bh

4,400.00

Jumlah 6.2

110,000.00 18,295.00

110,000.00

128,295.00

1 M² PAS. GENTENG KODOK TENAGA Tukang

0.075 Oh

85,000.00

Kepala Tukang

0.008 Oh

87,500.00

6,375.00 700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Genteng Kodok

25.000

Bh

3,800.00

Jumlah 6.3

95,000.00 18,295.00

95,000.00

113,295.00

1 M² PAS. GENTENG KACA TENAGA Tukang

0.075 Oh

85,000.00

Kepala Tukang

0.008 Oh

87,500.00

6,375.00 700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Genteng Kaca

25.000

Bh

14,100.00

Jumlah 6.4

352,500.00 18,295.00

352,500.00

370,795.00

1 M² PAS. GENTENG PRES BESAR / MANTILI TENAGA Tukang

0.075 Oh

85,000.00

6,375.00

Kepala Tukang

0.008 Oh

87,500.00

700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Genteng Pres besar / mantili

20.000

Bh

4,800.00

Jumlah 6.5

96,000.00 18,295.00

96,000.00

114,295.00

1 M' PAS. GENTENG BUBUNG PRES BIASA TENAGA Tukang

0.200 Oh

85,000.00

Kepala Tukang

0.020 Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.400 Oh

70,000.00

28,000.00

Mandor

0.002 Oh

90,000.00

180.00

BAHAN Genteng Bubung Pres

5.000

Bh

7,200.00

36,000.00

Semen abu-abu / PC

8.000

Kg

1,386.00

11,088.00

Pasir Brantas (beton)

0.032



276,400.00

Jumlah 6.6

8,844.80 46,930.00

1 M' PAS. GENTENG BUBUNG KODOK TENAGA Tukang

0.200 Oh

85,000.00

Kepala Tukang

0.020 Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.400 Oh

70,000.00

28,000.00

55,932.80

102,862.80

67 1

2 Mandor

3

4

0.002 Oh

90,000.00

5

6

7

180.00

BAHAN Genteng Bubung Kodok

5.000

Bh

7,200.00

36,000.00

Semen abu-abu / PC

8.000

Kg

1,386.00

11,088.00

0.032



276,400.00

Pasir Brantas (beton)

Jumlah 6.7

8,844.80 46,930.00

55,932.80

102,862.80

1 M² PAS. GENTENG GLAZURR TENAGA Tukang

0.075 Oh

85,000.00

6,375.00

Kepala Tukang

0.008 Oh

87,500.00

700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Genteng Glazurr

25.000 Jumlah

Bh

15,300.00

382,500.00 18,295.00

382,500.00

400,795.00

68 1 6.8

2

3

4

5

6

7

1 M' PAS. GENTENG BUBUNG GLAZURR TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.400 Oh

70,000.00

28,000.00

Mandor

0.002 Oh

90,000.00

180.00

Genteng Bubung Glazurr

4.000

Bh

30,100.00

120,400.00

Semen abu-abu / PC

8.000

Kg

1,386.00

11,088.00

Pasir Brantas (beton)

0.032



276,400.00

8,844.80

BAHAN

46,930.00 6.9

140,332.80

187,262.80

1 M² ONGKOS PAS. GENTENG LAMA TENAGA Tukang

0.075 Oh

85,000.00

6,375.00

Kepala Tukang

0.008 Oh

87,500.00

700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

Jumlah

720.00

18,295.00

18,295.00

PEKERJAAN PENUTUP ASBES GELOMBANG 6.10

1 M' PAS. ATAP ASBES GELOMBANG BESAR ( 1,05 X 3 m ) TEBAL 4 MM TENAGA Tukang

0.070 Oh

85,000.00

Kepala Tukang

0.007 Oh

87,500.00

5,950.00 612.50

Pekerja/Buruh tak terampil

0.140 Oh

70,000.00

9,800.00

Mandor

0.007 Oh

90,000.00

630.00

BAHAN Asbes Gel.Besar(1.05x 3m)x4mm

0.350

Lbr

104,800.00

Paku Kait

0.120

Kg

25,700.00

Jumlah 6.11

36,680.00 3,084.00 16,992.50

39,764.00

56,756.50

1 M² PAS. ATAP ASBES GELOMBANG KECIL ( 1,80 X 0.8 m ) TEBAL 4 MM TENAGA Tukang

0.070 Oh

85,000.00

Kepala Tukang

0.007 Oh

87,500.00

5,950.00 612.50

Pekerja/Buruh tak terampil

0.140 Oh

70,000.00

9,800.00

Mandor

0.007 Oh

90,000.00

630.00

Asbes Gel. Kecil(1.80x0.8m)x4mm

0.830

Lbr

42,900.00

Paku Kait

0.120

Kg

25,700.00

BAHAN

Jumlah 6.12

35,607.00 3,084.00 16,992.50

38,691.00

55,683.50

1 M' PAS. BUBUNG ASBES GELOMBANG ( 1.08 ) M TENAGA Tukang

0.125 Oh

85,000.00

10,625.00

Kepala Tukang

0.013 Oh

87,500.00

1,137.50

Pekerja/Buruh tak terampil

0.084 Oh

70,000.00

5,880.00

Mandor

0.004 Oh

90,000.00

360.00

Bubung Asbes Gel. Besar

2.050

Lbr

87,400.00

Paku Skrup

6.000

bh

930.00

BAHAN

Jumlah 6.13

179,170.00 5,580.00 18,002.50

1 M² PAS. GENTENG BETON TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

184,750.00

202,752.50

69 1

2

3

4

5

6

7

BAHAN Genteng Beton Paku

11.000

Bh

8,400.00

0.030

Kg

13,800.00

Jumlah

92,400.00 414.00 24,275.00

92,814.00

117,089.00

70 1 6.14

2

3

4

5

6

7

1 M' PAS. BUBUNG GENTENG BETON TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.400 Oh

70,000.00

28,000.00

Mandor

0.020 Oh

90,000.00

1,800.00

Bubung Genteng Beton

3.500

Bh

12,000.00

Paku

0.050

Kg

13,800.00

690.00

Semen abu-abu / PC

10.800

Kg

1,386.00

14,968.80

Pasir Brantas (beton)

0.032



276,400.00

8,844.80

Semen Warna

1.000

Kg

2,802.50

BAHAN

Jumlah 6.15

42,000.00

2,802.50 48,550.00

69,306.10

117,856.10

1 M2 PAS. ATAP SIRAP TENAGA Tukang

0.250 Oh

85,000.00

Kepala Tukang

0.025 Oh

87,500.00

21,250.00 2,187.50

Pekerja/Buruh tak terampil

0.166 Oh

70,000.00

11,620.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Atap Sirap Kayu Paku

60.000

bh

0.200

Kg

13,800.00

Jumlah 6.16

2,760.00 35,777.50

2,760.00

1 M' PAS. NOK ATAP SIRAP TENAGA Tukang

0.250 Oh

85,000.00

21,250.00

Kepala Tukang

0.025 Oh

87,500.00

2,187.50

Pekerja/Buruh tak terampil

0.125 Oh

70,000.00

8,750.00

Mandor

0.006 Oh

90,000.00

540.00

BAHAN Seng Plat BJLS 50

0.400

Lbr

41,200.00

16,480.00

Kayu Papan Tahun

0.004



7,848,000.00

31,392.00

Paku

0.110

Kg

13,800.00

Jumlah 6.17

1,518.00 32,727.50

49,390.00

82,117.50

1 M² PAS. ATAP SENG GELOMBANG TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

5,100.00 525.00

Pekerja/Buruh tak terampil

0.120 Oh

70,000.00

8,400.00

Mandor

0.006 Oh

90,000.00

540.00

Seng Gelombang BJLS 28

0.700

Lbr

86,900.00

Paku

0.020

Kg

13,800.00

BAHAN

Jumlah 6.18

60,830.00 276.00 14,565.00

61,106.00

75,671.00

1 M' PAS. NOK ATAP SENG GELOMBANG TENAGA Tukang

0.070 Oh

85,000.00

5,950.00

Kepala Tukang

0.008 Oh

87,500.00

700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.006 Oh

90,000.00

540.00

0.300

Lbr

26,600.00

0.040

Kg

13,800.00

11,740.00

BAHAN Seng Plat BJLS 28 Paku

Jumlah

7,980.00 552.00 17,690.00

8,532.00

26,222.00

71 1 6.19

2

3

4

5

6

7

1 M2 PAS. ATAP ALUMINIUM TENAGA Tukang

0.750 Oh

85,000.00

63,750.00

Kepala Tukang

0.008 Oh

87,500.00

700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.006 Oh

90,000.00

540.00

1.050

M2

60,300.00

0.020

Kg

13,800.00

11,740.00

BAHAN Atap Aluminium Gelombang Paku

Jumlah

63,315.00 276.00 75,490.00

63,591.00

139,081.00

72 1 6.20

2

3

4

5

6

7

1 M' PAS. NOK ATAP ALUMINIUM TENAGA Tukang

1.000 Oh

85,000.00

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.010 Oh

90,000.00

900.00

8,775.00

BAHAN Nok Standar 40 Cm 18 swg 22

1.200

M2

Paku

0.040

Kg

-

Jumlah 6.21

-

13,800.00

552.00 93,775.00

552.00

1 M2 PAS. ATAP ALUMINIUM FOIL / SISALATION TENAGA Tukang

0.050 Oh

85,000.00

Kepala Tukang

0.005 Oh

87,500.00

4,250.00 437.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

1.050

60,300.00

11,657.50

BAHAN Atap Aluminium Gelombang

Jumlah

M2

63,315.00 15,907.50

63,315.00

79,222.50

73 1

2

3

4

5

6

7

PEKERJAAN PENUTUP LANGIT - LANGIT 6.1

1 M² PAS. LANGIT - LANGIT ASBES / ETERNIT ( 100 X 100 )CM TENAGA Tukang

0.070 Oh

85,000.00

Kepala Tukang

0.007 Oh

87,500.00

612.50

Pekerja/Buruh tak terampil

0.030 Oh

70,000.00

2,100.00

0.0015 Oh

90,000.00

135.00

Mandor

5,950.00

BAHAN Plat asbes ( Eternit DN ) Paku Eternit

1.100



15,800.00

0.010

Kg

19,500.00

Jumlah 6.2

17,380.00 195.00 8,797.50

17,575.00

26,372.50

1 M² PAS. LANGIT - LANGIT AKUSTIK ( 60 X 120 ) CM TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.060 Oh

70,000.00

4,200.00

Mandor

0.003 Oh

90,000.00

270.00

BAHAN Akustik Arm Strong (60x120 )cm

1.500

Lbr

281,900.00

422,850.00

Paku Eternit

0.050

Kg

19,500.00

975.00

Jumlah 6.3

13,845.00

423,825.00

437,670.00

1 M² PAS. LANGIT - LANGIT TEAKWOOD ( 60 X 120 ) CM TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.070 Oh

70,000.00

4,900.00

0.0035 Oh

90,000.00

315.00

Mandor

8,500.00

BAHAN teakwood ( 120x240 ) cm Paku Eternit

0.375

Lbr

126,700.00

0.030

Kg

19,500.00

Jumlah 6.4

47,512.50 585.00 14,590.00

48,097.50

62,687.50

1 M² PAS. LANGIT - LANGIT ASBES / ETERNIT ( 100 X 100 ) cm PLAFON KAMPER TENAGA Tukang

0.320 Oh

85,000.00

Kepala Tukang

0.032 Oh

87,500.00

2,800.00

Pekerja/Buruh tak terampil

0.180 Oh

70,000.00

12,600.00

0.0770 Oh

90,000.00

6,930.00

Mandor

27,200.00

BAHAN Kayu kamper

0.0154



15,093,000.00

232,432.20

Paku

0.200

Kg

13,800.00

2,760.00

Plat Asbes ( Eternit )

1.100



15,800.00

17,380.00

Paku Eternit

0.010

Kg

19,500.00

Jumlah 6.5

195.00 49,530.00

252,767.20

1 M² PAS. LANGIT - LANGIT AKUSTIK ( 60 X 120 ) cm PLAFON KAMPER TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.260 Oh

70,000.00

18,200.00

0.0130 Oh

90,000.00

1,170.00

Mandor

34,000.00

BAHAN Kayu kanper

0.0163



15,093,000.00

246,015.90

Paku

0.250

Kg

13,800.00

3,450.00

Akustik Arm Strong ( 60x120) cm

1.500

Lbr

281,900.00

422,850.00

Paku Eternit

0.050

Kg

19,500.00

975.00

302,297.20

74 1

2

3

4

Jumlah 6.6

5 56,870.00

6

7

673,290.90

730,160.90

1 M² PAS. LANGIT - LANGIT TEAKWOOD ( 60 X 120 ) cm PLAFON KAMPER TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.270 Oh

70,000.00

18,900.00

0.0140 Oh

90,000.00

1,260.00

Mandor

34,000.00

BAHAN Kayu kanper

0.0163



15,093,000.00

246,015.90

Paku

0.250

Kg

13,800.00

3,450.00

teakwood (120x240 ) cm

0.375

Lbr

126,700.00

47,512.50

Paku Eternit

0.030

Kg

19,500.00

Jumlah

585.00 57,660.00

297,563.40

355,223.40

75 1 6.7

2

3

4

5

6

7

1 M² PAS. LANGIT - LANGIT ASBES / ETERNIT ( 100 X 100 ) cm PLAFON KRUING TENAGA Tukang

0.320 Oh

85,000.00

27,200.00

Kepala Tukang

0.032 Oh

87,500.00

2,800.00

0.180 Oh

70,000.00

12,600.00

0.0770 Oh

90,000.00

6,930.00

Pekerja/Buruh tak terampil Mandor BAHAN kayu kruing

0.0154



9,780,000.00

Paku

0.200

Kg

13,800.00

2,760.00

Plat Asbes ( Eternit )

1.100



15,800.00

17,380.00

0.010

Kg

19,500.00

Paku Eternit

Jumlah 6.8

150,612.00

195.00 49,530.00

170,947.00

220,477.00

1 M² PAS. LANGIT - LANGIT AKUSTIK ( 60 X 120 ) cm PLAFON KRUING TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.260 Oh

70,000.00

18,200.00

0.0130 Oh

90,000.00

1,170.00

Mandor

34,000.00

BAHAN Kayu Kruing

0.0163



9,780,000.00

159,414.00

Paku

0.250

Kg

13,800.00

3,450.00

Akustik Arm Strong ( 60x120 )cm

1.500

Lbr

281,900.00

422,850.00

Paku Eternit

0.050

Kg

19,500.00

Jumlah 6.9

975.00 56,870.00

586,689.00

643,559.00

1 M² PAS. LANGIT - LANGIT TEAKWOOD ( 60 X 120 ) cm PLAFON KRUING TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.270 Oh

70,000.00

18,900.00

0.0140 Oh

90,000.00

1,260.00

Mandor

34,000.00

BAHAN Kayu Kruing

0.0163



9,780,000.00

Paku

0.250

Kg

13,800.00

3,450.00

Teakwood ( 120x240 )cm

0.375

Lbr

126,700.00

47,512.50

0.030

Kg

19,500.00

Paku Eternit

Jumlah 6.10

159,414.00

585.00 57,660.00

210,961.50

268,621.50

1 M² PAS. LANGIT - LANGIT ASBES / ETERNIT ( 100 X 100 ) cm PLAFON MERANTI TENAGA Tukang

0.320 Oh

85,000.00

Kepala Tukang

0.032 Oh

87,500.00

2,800.00

Pekerja/Buruh tak terampil

0.180 Oh

70,000.00

12,600.00

0.0770 Oh

90,000.00

6,930.00

Mandor

27,200.00

BAHAN kayu Meranti

0.0154



7,969,000.00

Paku

0.200

Kg

13,800.00

2,760.00

Plat Asbes ( Eternit )

1.100



15,800.00

17,380.00

0.010

Kg

19,500.00

Paku Eternit

Jumlah 6.11

122,722.60

195.00 49,530.00

1 M² PAS. LANGIT - LANGIT AKUSTIK ( 60 X 120 ) cm PLAFON MERANTI TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.260 Oh

70,000.00

18,200.00

0.0130 Oh

90,000.00

1,170.00

Mandor BAHAN

34,000.00

143,057.60

192,587.60

76 1

2 kayu Meranti

3 0.0163

4 M³

5

7,969,000.00

6

7

129,894.70

Paku

0.250

Kg

13,800.00

3,450.00

Akustik Arm Strong ( 60x120 )cm

1.500

Lbr

281,900.00

422,850.00

Paku Eternit

0.050

Kg

19,500.00

975.00

Jumlah

56,870.00

557,169.70

614,039.70

77 1 6.12

2

3

4

5

6

7

1 M² PAS. LANGIT - LANGIT TEAKWOOD ( 60 X 120 ) cm PLAFON MERANTI TENAGA Tukang

0.400 Oh

85,000.00

34,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

0.270 Oh

70,000.00

18,900.00

0.0140 Oh

90,000.00

1,260.00

Pekerja/Buruh tak terampil Mandor BAHAN kayu Meranti

0.016



7,969,000.00

Paku

0.250

Kg

13,800.00

3,450.00

teakwood ( 120x240 )cm

0.375

Lbr

126,700.00

47,512.50

0.030

Kg

19,500.00

Paku Eternit

Jumlah 6.13

129,894.70

585.00 57,660.00

181,442.20

239,102.20

1 M² PAS. LANGIT - LANGIT ASBES / ETERNIT ( 100 X 100 ) cm PLAFON TAHUN TENAGA Tukang

0.320 Oh

85,000.00

Kepala Tukang

0.032 Oh

87,500.00

2,800.00

Pekerja/Buruh tak terampil

0.180 Oh

70,000.00

12,600.00

0.0770 Oh

90,000.00

6,930.00

Mandor

27,200.00

BAHAN Kayu Tahun

0.0154



7,486,000.00

115,284.40

Paku

0.200

Kg

13,800.00

2,760.00

Plat Asbes ( Eternit )

1.100



15,800.00

17,380.00

Paku Eternit

0.010

Kg

19,500.00

Jumlah 6.14

195.00 49,530.00

135,619.40

185,149.40

1 M² PAS. LANGIT - LANGIT AKUSTIK ( 60 X 120 ) cm PLAFON TAHUN TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.260 Oh

70,000.00

18,200.00

0.0130 Oh

90,000.00

1,170.00

Mandor

34,000.00

BAHAN Kayu Tahun

0.0163



7,486,000.00

Paku

0.250

Kg

13,800.00

3,450.00

Akustik Arm Strong ( 60x120 )cm

1.500

Lbr

281,900.00

422,850.00

0.050

Kg

19,500.00

Paku Eternit

Jumlah 6.15

122,021.80

975.00 56,870.00

549,296.80

606,166.80

1 M² PAS. LANGIT - LANGIT TEAKWOOD ( 60 X 120 ) cm PLAFON TAHUN TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.270 Oh

70,000.00

18,900.00

0.0140 Oh

90,000.00

1,260.00

Mandor

34,000.00

BAHAN Kayu Tahun

0.0163



7,486,000.00

Paku

0.250

Kg

13,800.00

3,450.00

Teakwood ( 120x240 )cm

0.375

Lbr

126,700.00

47,512.50

0.030

Kg

19,500.00

Paku Eternit

Jumlah 6.16

122,021.80

585.00 57,660.00

173,569.30

231,229.30

1 M² PAS. LANGIT - LANGIT GYPSUM BOARD ( 240 X 120 ) cm PLAFON TAHUN TENAGA Tukang

0.350 Oh

85,000.00

Kepala Tukang

0.035 Oh

87,500.00

3,062.50

Pekerja/Buruh tak terampil

0.300 Oh

70,000.00

21,000.00

0.0150 Oh

90,000.00

1,350.00

Mandor BAHAN

29,750.00

0.0032

78 1

2 Kayu Tahun

3

4

5

6

0.0163



7,486,000.00

Paku

0.250

Kg

13,800.00

3,450.00

Gypsum Board ( 120 x 240 ) cm

0.364



87,400.00

31,813.60

Paku Sekrup

0.110

Kg

13,800.00

1,518.00

Jumlah

7

122,021.80

55,162.50

158,803.40

213,965.90

79 1 6.17

2

3

4

5

6

7

1 M² PAS. LANGIT - LANGIT GYPSUM BOARD ( 240 X 120 ) cm PLAFON MERANTI TENAGA Tukang

0.350 Oh

85,000.00

29,750.00

Kepala Tukang

0.035 Oh

87,500.00

3,062.50

0.300 Oh

70,000.00

21,000.00

0.0150 Oh

90,000.00

1,350.00

Pekerja/Buruh tak terampil Mandor BAHAN Kayu Meranti

0.0163



7,969,000.00

Paku

0.250

Kg

13,800.00

3,450.00

Gypsum Board ( 120 x 240 ) cm

0.364



87,400.00

31,813.60

0.110

Kg

13,800.00

Paku Sekrup

Jumlah 6.18

129,894.70

1,518.00 55,162.50

166,676.30

221,838.80

1 M² PAS. LANGIT - LANGIT GYPSUM BOARD ( 240 X 120 ) cm PLAFON KAMPER TENAGA Tukang

0.350 Oh

85,000.00

Kepala Tukang

0.035 Oh

87,500.00

3,062.50

Pekerja/Buruh tak terampil

0.300 Oh

70,000.00

21,000.00

0.0150 Oh

90,000.00

1,350.00

Mandor

29,750.00

BAHAN Kayu Kamper

0.0163



15,093,000.00

246,015.90

Paku

0.250

Kg

13,800.00

3,450.00

Gypsum Board ( 120 x 240 ) cm

0.364



87,400.00

31,813.60

Paku Sekrup

0.110

Kg

13,800.00

Jumlah 6.19

1,518.00 55,162.50

282,797.50

337,960.00

1 M² PAS. LANGIT - LANGIT ASBES / ETERNIT ( 100 X 100 ) cm PLAFON KAYU LAMA TENAGA Tukang

0.320 Oh

85,000.00

Kepala Tukang

0.032 Oh

87,500.00

2,800.00

Pekerja/Buruh tak terampil

0.180 Oh

70,000.00

12,600.00

0.0770 Oh

90,000.00

6,930.00

Mandor

27,200.00

BAHAN Paku

0.200

Kg

13,800.00

2,760.00

Plat Asbes ( Eternit )

1.100



15,800.00

17,380.00

0.010

Kg

19,500.00

Paku Eternit

Jumlah

195.00 49,530.00

20,335.00

69,865.00

80 1

2

3

4

5

6

7

PEKERJAAN SANITASI 6.1

1 BH PAS. KLOSET DUDUK / MONOBLOK TENAGA Tukang

1.100 Oh

85,000.00

Kepala Tukang

0.011 Oh

87,500.00

962.50

Pekerja/Buruh tak terampil

3.300 Oh

70,000.00

231,000.00

0.1600 Oh

90,000.00

14,400.00

Mandor

93,500.00

BAHAN Kloset Duduk Monoblok

1.000

Perlengkapan 6 % harga Kloset

0.060

Bh

2,716,800.00

Jumlah 6.2

2,716,800.00

2,716,800.00

163,008.00 339,862.50

2,879,808.00

3,219,670.50

1 BH PAS. KLOSET JONGKOK PORSELIN TENAGA Tukang

1.500 Oh

85,000.00

127,500.00

Kepala Tukang

0.150 Oh

87,500.00

13,125.00

Pekerja/Buruh tak terampil

1.000 Oh

70,000.00

70,000.00

0.1600 Oh

90,000.00

14,400.00

Mandor BAHAN Kloset Jongkok Porselin

1.000

Bh

173,900.00

173,900.00

Semen abu-abu / PC

6.000

Kg

1,386.00

8,316.00

Pasir Brantas (beton)

0.010



276,400.00

Jumlah 6.3

2,764.00 225,025.00

184,980.00

410,005.00

1 BH PAS. KLOSET JONGKOK TRASO TENAGA Tukang

1.500 Oh

85,000.00

127,500.00

Kepala Tukang

0.300 Oh

87,500.00

26,250.00

Pekerja/Buruh tak terampil

1.000 Oh

70,000.00

70,000.00

Mandor

0.110 Oh

90,000.00

9,900.00

Kloset Jongkok traso

1.000

Bh

48,300.00

48,300.00

Semen abu-abu / PC

6.000

Kg

1,386.00

8,316.00

Pasir Brantas (beton)

0.010



276,400.00

2,764.00

Bata Merah

7.000

Bj

1,040.00

BAHAN

Jumlah 6.4

7,280.00 233,650.00

66,660.00

300,310.00

1 BH PAS. WASTAFEL TENAGA Tukang

1.450 Oh

85,000.00

123,250.00

Kepala Tukang

0.150 Oh

87,500.00

13,125.00

Pekerja/Buruh tak terampil

1.200 Oh

70,000.00

84,000.00

0.1000 Oh

90,000.00

9,000.00

Mandor BAHAN Wastafel

1.000

Perlengkapanya 12 % harga barang

0.120

Semen abu-abu / PC

6.000

Pasir Brantas (beton)

0.010

Bh

431,600.00

431,600.00

431,600.00

51,792.00

Kg

1,386.00

8,316.00



276,400.00

2,764.00

Jumlah 6.5

229,375.00

494,472.00

1 BH PAS. BADKIP PORSELIN TENAGA Tukang

0.075 Oh

85,000.00

6,375.00

Kepala Tukang

0.750 Oh

87,500.00

65,625.00

Pekerja/Buruh tak terampil Mandor

-

Oh

70,000.00

0.2500 Oh

90,000.00

22,500.00

BAHAN Badkip

1.000

Bh

4,029,200.00

4,029,200.00

723,847.00

81 1

2 Perlengkapanya 20 % harga barang

3

4

0.200 Jumlah

6.6

5

4,029,200.00

6

7

805,840.00 94,500.00

4,835,040.00

4,929,540.00

1 BH PAS. BAK BETON VOL. 1 M ³ AIR TENAGA Tukang

4.500 Oh

85,000.00

Kepala Tukang

0.900 Oh

87,500.00

382,500.00 78,750.00

Pekerja/Buruh tak terampil

3.500 Oh

70,000.00

245,000.00

Mandor

0.900 Oh

90,000.00

81,000.00

BAHAN Beton 1;2;3

0.564



1,016,117.50

573,090.27

Besi Beton

2,178,000.00

180.00

Kg

12,100.00

Kawat tali

2.400

Kg

16,900.00

40,560.00

Cetakan Kayu Tahun

0.360



7,486,000.00

2,694,960.00

Ubin Porselin

5.000



63,700.00

318,500.00

Perlengkapan 10 % harga total bahan

0.100

318,500.00

31,850.00

Jumlah

787,250.00

5,836,960.27

6,624,210.27

82 1 6.7

2

3

4

5

6

7

1 BH PAS. BAK FIBERGLASS VOL. 1 M ³ AIR TENAGA Tukang

4.500 Oh

85,000.00

382,500.00

Kepala Tukang

0.900 Oh

87,500.00

78,750.00

Pekerja/Buruh tak terampil

3.000 Oh

70,000.00

210,000.00

Mandor

0.900 Oh

90,000.00

81,000.00

BAHAN Bak Fiberglass

1.000

Perlengkapan 12 % harga Fiberglass

0.120

Bh

470,900.00

Jumlah 6.8

470,900.00

470,900.00

56,508.00 752,250.00

527,408.00

1,279,658.00

1 BH PAS. BUIS BETON, DIA 15 - 20 cm TENAGA Tukang

0.070 Oh

85,000.00

Kepala Tukang

0.007 Oh

87,500.00

5,950.00 612.50

Pekerja/Buruh tak terampil

0.140 Oh

70,000.00

9,800.00

Mandor

0.007 Oh

90,000.00

630.00

BAHAN Buis Beton ø 15 - 20 cm

1.100

Bh

48,300.00

53,130.00

Pas. Batu bata 1: 4

0.027



132,349.20

3,573.43

Semen abu-abu / PC

3.920

Kg

1,386.00

5,433.12

Pasir Brantas (beton)

0.056



276,400.00

15,478.40

0.240



120,700.00

Pasir Urug

Jumlah 6.9

28,968.00 16,992.50

106,582.95

123,575.45

1M' PAS. BUIS BETON, DIA 30 cm - 100 cm TENAGA Tukang

0.190 Oh

85,000.00

16,150.00

Kepala Tukang

0.019 Oh

87,500.00

1,662.50

Pekerja/Buruh tak terampil

0.380 Oh

70,000.00

26,600.00

Mandor

0.019 Oh

90,000.00

1,710.00

1.100

Bh

72,400.00

79,640.00

BAHAN Buis Beton ø 30 cm Pas. Batu bata 1 : 3

0.550



135,497.82

74,523.80

Semen abu-abu / PC

10.300

Kg

1,386.00

14,275.80

Pasir Brantas (beton)

0.061



276,400.00

16,860.40

Pasir Urg

0.069



120,700.00

Jumlah 6.10

8,328.30 46,122.50

193,628.30

239,750.80

1 BH PAS. BAK KONTROL BATU BATA UK. 45 X 45 CM TENAGA Tukang

0.473 Oh

85,000.00

Kepala Tukang

0.047 Oh

87,500.00

40,205.00 4,112.50

Pekerja/Buruh tak terampil

1.420 Oh

70,000.00

99,400.00

Mandor

0.071 Oh

90,000.00

6,390.00

BAHAN Pas. Batu bata 1 : 3

0.250



135,497.82

33,874.46

Semen abu-abu / PC

77.000

Kg

1,386.00

106,722.00

Pasir Brantas (beton)

0.220



276,400.00

60,808.00

Besi Beton

2.600

Kg

12,100.00

31,460.00

Batu Pecah Split 1 - 2 cm

0.020



353,800.00

7,076.00

Jumlah 6.11

150,107.50

1 BH PAS. BAK KONTROL BATU BATA UK. 60 X 60 CM TENAGA Tukang

0.720 Oh

85,000.00

61,200.00

Kepala Tukang

0.072 Oh

87,500.00

6,300.00

Pekerja/Buruh tak terampil

2.160 Oh

70,000.00

151,200.00

239,940.46

390,047.96

83 1

2 Mandor

3

4

0.108 Oh

90,000.00

5

6

7

9,720.00

BAHAN Pas. Batu bata 1 : 3

0.371



135,497.82

50,269.69

Semen abu-abu / PC

114.000

Kg

1,386.00

158,004.00

Pasir Brantas (beton)

0.304



276,400.00

84,025.60

Besi Beton

4.850

Kg

12,100.00

58,685.00

Batu Pecah Split 1 - 2 cm

0.033



353,800.00

Jumlah

11,675.40 228,420.00

362,659.69

591,079.69

84 1 6.12

2

3

4

5

6

7

1 M' PASANG PIPA GALVANIS DIA 1/2 " TENAGA Tukang

0.090 Oh

85,000.00

7,650.00

Kepala Tukang

0.009 Oh

87,500.00

787.50

Pekerja/Buruh tak terampil

0.054 Oh

70,000.00

3,780.00

Mandor

0.027 Oh

90,000.00

2,430.00

BAHAN Pipa Galvanis ø 1/2 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

30,100.00

Jumlah 6.13

36,120.00

36,120.00

12,642.00 14,647.50

48,762.00

63,409.50

1 M' PASANG PIPA GALVANIS DIA 3/4" TENAGA Tukang

0.090 Oh

85,000.00

Kepala Tukang

0.009 Oh

87,500.00

7,650.00 787.50

Pekerja/Buruh tak terampil

0.054 Oh

70,000.00

3,780.00

Mandor

0.027 Oh

90,000.00

2,430.00

12,217.50

BAHAN Pipa Galvanis ø 3/4 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

38,100.00

Jumlah 6.14

45,720.00

45,720.00

16,002.00 14,647.50

61,722.00

76,369.50

1 M' PASANG PIPA GALVANIS DIA 1 " TENAGA Tukang

0.090 Oh

85,000.00

Kepala Tukang

0.009 Oh

87,500.00

7,650.00 787.50

Pekerja/Buruh tak terampil

0.054 Oh

70,000.00

3,780.00

Mandor

0.027 Oh

90,000.00

2,430.00

BAHAN Pipa Galvanis ø 1 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

48,100.00

Jumlah 6.15

57,720.00

57,720.00

20,202.00 14,647.50

77,922.00

92,569.50

1 M' PASANG PIPA GALVANIS DIA 1.1/2 " TENAGA Tukang

0.180 Oh

85,000.00

15,300.00

Kepala Tukang

0.018 Oh

87,500.00

1,575.00

Pekerja/Buruh tak terampil

0.108 Oh

70,000.00

7,560.00

0.0054 Oh

90,000.00

486.00

Mandor BAHAN Pipa Galvanis ø 1.1/2 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

64,500.00

Jumlah 6.16

77,400.00

77,400.00

27,090.00 24,921.00

104,490.00

129,411.00

1 M' PASANG PIPA GALVANIS DIA 2 " TENAGA Tukang

0.180 Oh

85,000.00

15,300.00

Kepala Tukang

0.018 Oh

87,500.00

1,575.00

Pekerja/Buruh tak terampil

0.108 Oh

70,000.00

7,560.00

0.0054 Oh

90,000.00

486.00

Mandor BAHAN Pipa Galvanis ø 2 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

90,600.00 108,720.00

Jumlah 6.17

108,720.00 38,052.00 24,921.00

1 M' PASANG PIPA GALVANIS DIA 3 " TENAGA Tukang

0.180 Oh

85,000.00

15,300.00

Kepala Tukang

0.018 Oh

87,500.00

1,575.00

146,772.00

171,693.00

85 1

2 Pekerja/Buruh tak terampil Mandor

3

4

5

6

0.108 Oh

70,000.00

7,560.00

0.0054 Oh

90,000.00

486.00

7

BAHAN Pipa Galvanis ø 3 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

144,400.00 173,280.00

Jumlah 6.18

173,280.00 60,648.00 24,921.00

233,928.00

258,849.00

1 M' PASANG PIPA GALVANIS DIA 4 " TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.225 Oh

85,000.00

19,125.00

0.0225 Oh

87,500.00

1,968.75

0.135 Oh

70,000.00

9,450.00

0.0068 Oh

90,000.00

612.00

BAHAN Pipa Galvanis ø 4 " Perlengkapan 35 % Harga Barang

1.20 0.350 Jumlah

M'

233,800.00

280,560.00

280,560.00

98,196.00 31,155.75

378,756.00

409,911.75

86 1 6.19

2

3

4

5

6

7

1 M' PASANG PIPA PVC TYPE AW DIA 1/2 " TENAGA Tukang

0.060 Oh

85,000.00

5,100.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Pekerja/Buruh tak terampil Mandor BAHAN Pipa PVC Type AW ø 1/2 "

1.20

Perlengkapan 35 % Harga Barang

M'

0.350

6,600.00

Jumlah 6.20

7,920.00

7,920.00

2,772.00 8,307.00

10,692.00

18,999.00

1 M' PASANG PIPA PVC TYPE AW DIA 3/4 " TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Mandor

5,100.00

BAHAN Pipa PVC Type AW ø 3/4 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

8,800.00

Jumlah 6.21

10,560.00

10,560.00

3,696.00 8,307.00

14,256.00

22,563.00

1 M' PASANG PIPA PVC TYPE AW DIA 1 " TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Mandor

5,100.00

BAHAN Pipa PVC Type AW ø 1 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

11,400.00

Jumlah 6.22

13,680.00

13,680.00

4,788.00 8,307.00

18,468.00

26,775.00

1 M' PASANG PIPA PVC TYPE AW DIA 1.1/2 " TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Mandor

5,100.00

BAHAN Pipa PVC Type AW ø 1.1/2 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

21,100.00

Jumlah 6.23

25,320.00

25,320.00

8,862.00 8,307.00

34,182.00

42,489.00

1 M' PASANG PIPA PVC TYPE AW DIA 2 " TENAGA Tukang

0.090 Oh

85,000.00

Kepala Tukang

0.009 Oh

87,500.00

787.50

Pekerja/Buruh tak terampil

0.054 Oh

70,000.00

3,780.00

0.0027 Oh

90,000.00

243.00

Mandor

7,650.00

BAHAN Pipa PVC Type AW ø 2 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

33,100.00 39,720.00

Jumlah 6.24

39,720.00 13,902.00 12,460.50

1 M' PASANG PIPA PVC TYPE AW DIA 3 " TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil

0.135 Oh

85,000.00

11,475.00

0.0135 Oh

87,500.00

1,181.25

0.081 Oh

70,000.00

5,670.00

53,622.00

66,082.50

87 1

2 Mandor

3

4

0.0041 Oh

90,000.00

5

6

7

369.00

BAHAN Pipa PVC Type AW ø 3. " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

60,000.00

72,000.00

72,000.00

25,200.00

Jumlah 6.25

18,695.25

97,200.00

115,895.25

1 M' PASANG PIPA PVC TYPE AW DIA 4 " TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.135 Oh

85,000.00

11,475.00

0.0135 Oh

87,500.00

1,181.25

0.081 Oh

70,000.00

5,670.00

0.0041 Oh

90,000.00

369.00

BAHAN Pipa PVC Type AW ø 4 " Perlengkapan 35 % Harga Barang

1.20 0.350 Jumlah

M'

74,800.00

89,760.00

89,760.00

31,416.00 18,695.25

121,176.00

139,871.25

88 1 6.26

2

3

4

5

6

7

1 M' PASANG PIPA PVC TYPE AW DIA 6 " TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.135 Oh

85,000.00

11,475.00

0.0135 Oh

87,500.00

1,181.25

0.081 Oh

70,000.00

5,670.00

0.0041 Oh

90,000.00

369.00

BAHAN Pipa PVC Type AW ø 6 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

167,500.00

Jumlah 6.27

201,000.00

201,000.00

70,350.00 18,695.25

271,350.00

290,045.25

1 M' PASANG PIPA PVC TYPE C DIA 3/4 " TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Mandor

5,100.00

BAHAN Pipa PVC Type C ø 3/4 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

4,700.00

Jumlah 6.28

5,640.00

5,640.00

1,974.00 8,307.00

7,614.00

15,921.00

1 M' PASANG PIPA PVC TYPE C DIA 1 " TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Mandor

5,100.00

BAHAN Pipa PVC Type C ø 1 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

6,700.00

Jumlah 6.29

8,040.00

8,040.00

2,814.00 8,307.00

10,854.00

19,161.00

1 M' PASANG PIPA PVC TYPE C DIA 1.5 " TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Mandor

5,100.00

8,145.00

BAHAN Pipa PVC Type C ø 1.5 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

9,000.00

Jumlah 6.30

10,800.00

10,800.00

3,780.00 8,307.00

14,580.00

22,887.00

1 M' PASANG PIPA PVC TYPE C DIA 2 " TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Mandor

5,100.00

BAHAN Pipa PVC Type C ø 2 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

12,400.00 14,880.00

Jumlah 6.31

14,880.00 5,208.00 8,307.00

1 M' PASANG PIPA PVC TYPE C DIA 2.5 " TENAGA Tukang

0.090 Oh

85,000.00

7,650.00

Kepala Tukang

0.009 Oh

87,500.00

787.50

Pekerja/Buruh tak terampil

0.054 Oh

70,000.00

3,780.00

20,088.00

28,395.00

89 1

2 Mandor

3

4

0.0027 Oh

90,000.00

5

6

7

243.00

BAHAN Pipa PVC Type C ø 2.5 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

15,700.00

18,840.00

18,840.00

6,594.00

Jumlah 6.32

12,460.50

25,434.00

37,894.50

1 M' PASANG PIPA PVC TYPE C DIA 3 " TENAGA Tukang

0.135 Oh

85,000.00

11,475.00

Kepala Tukang

0.014 Oh

87,500.00

1,181.25

Pekerja/Buruh tak terampil

0.081 Oh

70,000.00

5,670.00

0.0041 Oh

90,000.00

369.00

Mandor BAHAN Pipa PVC Type C ø 3. " Perlengkapan 35 % Harga Barang

1.20 0.350 Jumlah

M'

17,300.00

20,760.00

20,760.00

7,266.00 18,695.25

28,026.00

46,721.25

90 1 6.33

2

3

4

5

6

7

1 M' PASANG PIPA PVC TYPE C DIA 4 " TENAGA Tukang

0.135 Oh

85,000.00

11,475.00

Kepala Tukang

0.014 Oh

87,500.00

1,181.25

0.081 Oh

70,000.00

5,670.00

0.0041 Oh

90,000.00

369.00

Pekerja/Buruh tak terampil Mandor BAHAN Pipa PVC Type C ø 4 "

1.20

Perlengkapan 35 % Harga Barang

M'

0.350

23,100.00

Jumlah 6.34

27,720.00

27,720.00

9,702.00 18,695.25

37,422.00

56,117.25

1 BH PASANG BAK CUCI STAINLES STEEL TENAGA Tukang

0.300 Oh

85,000.00

25,500.00

Kepala Tukang

0.030 Oh

87,500.00

2,625.00

Pekerja/Buruh tak terampil

0.030 Oh

70,000.00

2,100.00

0.0015 Oh

90,000.00

135.00

Mandor BAHAN Bak Cuci Stainless Steel

1.00

Bh

229,400.00

Water drain + Assesoris

1.000

Stl

95,400.00

Jumlah 6.35

229,400.00 95,400.00 30,360.00

324,800.00

355,160.00

1 BH PASANG BAK CUCI TRASO TENAGA Tukang

0.500 Oh

85,000.00

42,500.00

Kepala Tukang

0.050 Oh

87,500.00

4,375.00

Pekerja/Buruh tak terampil

0.050 Oh

70,000.00

3,500.00

0.0025 Oh

90,000.00

225.00

Mandor BAHAN Bak Cuci Teraso

1.000

Bh

135,497.82

135,497.82

Water drain + Assesoris

1.000

Bh

95,400.00

95,400.00

Semen abu-abu / PC

20.000

M'

1,386.00

27,720.00

Pasir Brantas (beton)

0.050

Kg

276,400.00

13,820.00

Jumlah 6.36

50,600.00

272,437.82

323,037.82

1 BH PASANG KRAN DIA "1/2" TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.010 Oh

70,000.00

700.00

Mandor

0.005 Oh

90,000.00

450.00

Kran ø "1/2"

1.000

Bh

36,600.00

36,600.00

Seal tape

0.025

Bh

3,100.00

77.50

BAHAN

Jumlah 6.37

10,525.00

36,677.50

47,202.50

1 BH PASANG KRAN DIA " 3/4" TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.010 Oh

70,000.00

700.00

Mandor

0.005 Oh

90,000.00

450.00

Kran ø "3/4"

1.000

Bh

41,800.00

Seal tape

0.025

Bh

3,100.00

BAHAN

Jumlah 6.38

1 BH PASANG AVOOR BAK MANDI TENAGA

41,800.00 77.50 10,525.00

41,877.50

52,402.50

91 1

2

3

4

5

6

Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.010 Oh

70,000.00

700.00

0.0050 Oh

90,000.00

450.00

Mandor

7

BAHAN Avoor Bak Mandi

1.000 Jumlah

Bh

48,300.00

48,300.00 10,525.00

48,300.00

58,825.00

92 1 6.39

2

3

4

5

6

7

1 BH PASANG AVOOR KAMAR MANDI TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

0.010 Oh

70,000.00

700.00

0.0050 Oh

90,000.00

450.00

Pekerja/Buruh tak terampil Mandor BAHAN Avoor KM

1.000 Jumlah

Bh

61,300.00

61,300.00 10,525.00

61,300.00

71,825.00

93 1

2

3

4

5

6

7

PEKERJAAN BESI DAN ALUMINIUM 6.1

1 KG PABRIKASI DAN PASANG RANGKA ATAP BAJA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.077 Oh

85,000.00

0.0006 Oh

87,500.00

6,545.00 52.50

0.196 Oh

70,000.00

13,720.00

0.1400 Oh

90,000.00

12,600.00

BAHAN Baja Profil WF Elektroda 20% x harga bahan

1.100

Kg

17,600.00

0.200

%

19,360.00

Jumlah 6.2

19,360.00 3,872.00 32,917.50

23,232.00

56,149.50

1 M² PASANG PINTU BESI BAJA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.650 Oh

85,000.00

55,250.00

0.0650 Oh

87,500.00

5,687.50

0.650 Oh

70,000.00

45,500.00

0.0320 Oh

90,000.00

2,880.00

BAHAN Pintu Besi Baja

1.000



1,147,100.00

Jumlah 6.3

1,147,100.00 109,317.50

1,147,100.00

1,256,417.50

1 M² PASANG JENDELA BESI BAJA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

1.050 Oh

85,000.00

0.1050 Oh

87,500.00

89,250.00 9,187.50

1.050 Oh

70,000.00

73,500.00

0.00525 Oh

90,000.00

472.50

BAHAN Jendela Besi Baja

1.000



802,700.00

Jumlah 6.4

802,700.00 172,410.00

802,700.00

975,110.00

1 M² PASANG PINTU BESI GANTUNG TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

1.050 Oh

85,000.00

0.1050 Oh

87,500.00

89,250.00 9,187.50

1.050 Oh

70,000.00

73,500.00

0.00525 Oh

90,000.00

472.50

BAHAN Pintu Besi Gantung

1.000



1,212,900.00

Jumlah 6.5

1,212,900.00 172,410.00

1,212,900.00

1,385,310.00

1 M² PASANG PINTU BESI GULUNG TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

1.200 Oh

85,000.00

102,000.00

0.1200 Oh

87,500.00

10,500.00

1.200 Oh

70,000.00

84,000.00

0.0060 Oh

90,000.00

540.00

BAHAN Pintu Besi Gulung

1.000



519,100.00

Jumlah 6.6

519,100.00 197,040.00

519,100.00

716,140.00

1 M² PASANG PINTU BESI LIPAT Tukang

0.440 Oh

85,000.00

Kepala Tukang

0.044 Oh

87,500.00

37,400.00 3,850.00

Pekerja/Buruh tak terampil

0.440 Oh

70,000.00

30,800.00

Mandor

0.022 Oh

90,000.00

1,980.00

BAHAN Pintu Besi Lipat

1.000 Jumlah



1,186,500.00

1,186,500.00 74,030.00

1,186,500.00

1,260,530.00

94 1

2

6.7

1 M² PASANG ROLLING DOOR BESI

3

4

5

6

7

TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

1.200 Oh

85,000.00

102,000.00

0.1200 Oh

87,500.00

10,500.00

1.200 Oh

70,000.00

84,000.00

0.0060 Oh

90,000.00

540.00

BAHAN Rolling door besi

1.000 Jumlah



519,100.00

519,100.00 197,040.00

519,100.00

716,140.00

95 1 6.8

2

3

4

5

6

7

1 M² PASANG ROLLING DOOR ALUMUNIUM TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

1.000 Oh

85,000.00

85,000.00

0.1000 Oh

87,500.00

8,750.00

1.000 Oh

70,000.00

70,000.00

0.0500 Oh

90,000.00

4,500.00

BAHAN Rolling door aluminium

1.000



868,400.00

Jumlah 6.9

868,400.00 168,250.00

868,400.00

1,036,650.00

1 M² PASANG PINTU ALUMINIUM TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

1.050 Oh

85,000.00

0.1050 Oh

87,500.00

89,250.00 9,187.50

1.050 Oh

70,000.00

73,500.00

0.0052 Oh

90,000.00

468.00

BAHAN Pintu Aluminium

1.000



543,300.00

Jumlah 6.10

543,300.00 172,405.50

543,300.00

715,705.50

1 M² PASANG DAUN JENDELA KACA ALUMUNIUM TENAGA Tukang

0.085 Oh

85,000.00

7,225.00

Kepala Tukang

0.008 Oh

87,500.00

700.00

Pekerja/Buruh tak terampil

0.085 Oh

70,000.00

5,950.00

Mandor

0.004 Oh

90,000.00

360.00

BAHAN Profil Aluminium

4.400

M1

Profil Kaca

4.500

M1

Sealent

0.270 Tube

210,100.00

924,440.00

6,000.00

27,000.00

15,000.00

Jumlah 6.11

4,050.00 14,235.00

955,490.00

969,725.00

1 M² PASANG PINTU KACA RANGKA ALUMINIUM TENAGA Tukang

0.085 Oh

85,000.00

Kepala Tukang

0.008 Oh

87,500.00

7,225.00 700.00

Pekerja/Buruh tak terampil

0.085 Oh

70,000.00

5,950.00

Mandor

0.004 Oh

90,000.00

360.00

BAHAN Profil Aluminium

4.400



Profil Kaca

4.500

M'

Sealent

0.270 Tube

271,900.00

1,196,360.00

6,000.00

27,000.00

15,000.00

Jumlah 6.12

4,050.00 14,235.00

1,227,410.00

1,241,645.00

1 M² PASANG TERALI BESI TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

1.200 Oh

85,000.00

0.0120 Oh

87,500.00

102,000.00 1,050.00

1.200 Oh

70,000.00

84,000.00

0.0006 Oh

90,000.00

54.00

BAHAN Besi Teralis

1.100



845,200.00

Jumlah 6.13

929,720.00 187,104.00

1 M² PASANG KAWAT HARMONIKA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil

0.100 Oh

85,000.00

8,500.00

0.0100 Oh

87,500.00

875.00

0.100 Oh

70,000.00

7,000.00

929,720.00

1,116,824.00

96 1

2 Mandor

3

4

0.0005 Oh

90,000.00

5

6

7

45.00

BAHAN Kawat Harmonika

1.100



27,000.00

29,700.00

Paku

0.020

Kg

13,800.00

276.00

0.0018



15,395,000.00

Papan Kayu Kanper

Jumlah

27,711.00 16,420.00

57,687.00

74,107.00

97 1 6.14

2

3

4

5

6

7

1 M² PASANG KAWAT KASA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.100 Oh

85,000.00

8,500.00

0.0100 Oh

87,500.00

875.00

0.100 Oh

70,000.00

7,000.00

0.0005 Oh

90,000.00

45.00

BAHAN Kawat Kasa

1.100



21,500.00

Paku

0.020

Kg

13,800.00

276.00

0.0018



15,395,000.00

27,711.00

Papan Kayu Kanper

Jumlah 6.15

23,650.00

16,420.00

51,637.00

68,057.00

1 M² PASANG KAWAT BURUNG TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.100 Oh

85,000.00

8,500.00

0.0100 Oh

87,500.00

875.00

0.100 Oh

70,000.00

7,000.00

0.0005 Oh

90,000.00

45.00

BAHAN Kawat Burung

1.100



17,200.00

Paku

0.020

Kg

13,800.00

276.00

0.0018



15,395,000.00

27,711.00

Papan Kayu Kanper

Jumlah 6.16

18,920.00

16,420.00

46,907.00

63,327.00

1 M² PASANG KAWAT NYAMUK TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.100 Oh

85,000.00

8,500.00

0.0100 Oh

87,500.00

875.00

0.100 Oh

70,000.00

7,000.00

0.0005 Oh

90,000.00

45.00

BAHAN Kawat Nyamuk

1.100



15,000.00

16,500.00

Paku

0.020

Kg

13,800.00

276.00

0.0018



15,395,000.00

Papan Kayu Kanper

Jumlah 6.17

27,711.00 16,420.00

44,487.00

60,907.00

1 M² PASANG JENDELA NAKO & TERALIS TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.200 Oh

85,000.00

17,000.00

0.0200 Oh

87,500.00

1,750.00

0.200 Oh

70,000.00

14,000.00

0.0010 Oh

90,000.00

90.00

BAHAN Jendela Nako

1.100



272,300.00

299,530.00

Besi Strip

7.000

M1

20,800.00

145,600.00

10.000

BH

930.00

Paku Biasa (Sekrup 1-2,5 cm)

Jumlah 6.18

9,300.00 32,840.00

454,430.00

487,270.00

1 M' PASANG TALANG DATAR / MIRING BJLS 28 Lebar 90 cm TENAGA Tukang

0.400 Oh

85,000.00

34,000.00

Kepala Tukang

0.025 Oh

87,500.00

2,187.50

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

Seng Plat BJLS 30

1.050

M1

41,200.00

43,260.00

Paku

0.015

Kg

13,800.00

207.00

0.019



7,848,000.00

BAHAN

Papan Kayu

Jumlah

149,112.00 51,087.50

192,579.00

243,666.50

98 1 6.19

2

3

4

5

6

7

1 KG PASANG BESI PROFIL TENAGA Tukang Las

0.060 Oh

85,000.00

5,100.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.060 Oh

70,000.00

4,200.00

Mandor

0.003 Oh

90,000.00

270.00

1.150

17,600.00

BAHAN Besi Profil

Jumlah

Kg

20,240.00 10,095.00

20,240.00

30,335.00

99 1 6.20

2

3

4

5

6

7

1 KG PASANG RANGKA KUDA-KUDA BAJA IWF TENAGA Tukang Las

0.060 Oh

85,000.00

5,100.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.060 Oh

70,000.00

4,200.00

Mandor

0.003 Oh

90,000.00

270.00

1.150

17,600.00

BAHAN Besi Baja IWF

Kg

Jumlah 6.21

20,240.00 10,095.00

20,240.00

30,335.00

100 KG PEKERJAAN PERAKITAN TENAGA Tukang Besi

0.100 Oh

85,000.00

Kepala Tukang

0.001 Oh

87,500.00

8,500.00 87.50

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

459.00

BAHAN Solar

1.000

Ltr

6,100.00

Minyak Pelumas

0.100

Ltr

31,300.00

Jumlah 6.22

6,100.00 3,130.00 16,046.50

9,230.00

25,276.50

1 M2 MENGERJAKAN PINTU BESI PLAT BAJA TEBAL 2 MM RANGKAP, RANGKA BAJA SIKU TENAGA Tukang Las

1.050 Oh

85,000.00

Kepala Tukang

0.105 Oh

87,500.00

89,250.00 9,187.50

Pekerja/Buruh tak terampil

1.050 Oh

70,000.00

73,500.00

Mandor

0.052 Oh

90,000.00

4,680.00

BAHAN Besi Siku L 30,30,3 Kawat Las Besi Plat Baja

15.000

Kg

20,800.00

0.050

Kg

17,600.00

880.00

32.800

Kg

20,800.00

682,240.00

Jumlah 6.23

312,000.00

176,617.50

995,120.00

1,171,737.50

1 CM MENGERJAKAN PENGELASAN DENGAN LISTRIK TENAGA Tukang Las Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.002 Oh

85,000.00

0.0002 Oh

87,500.00

170.00 17.50

0.004 Oh

70,000.00

280.00

0.0002 Oh

90,000.00

18.00

BAHAN Kawat Las

0.040

Kg

17,600.00

704.00

Solar

0.030

Ltr

6,100.00

183.00

Minyak Pelumas

0.004

Ltr

31,300.00

125.20

4.000 6.24

485.50

1,012.20

1,497.70

1 M' KUSEN PINTU ALUMUNIUM PUTIH TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.043 Oh

85,000.00

0.0043 Oh

87,500.00

3,655.00 376.25

0.043 Oh

70,000.00

3,010.00

0.0021 Oh

90,000.00

189.00

BAHAN Kusen Alumunium Putih

1.100

m'

108,600.00

119,460.00

Skrup Fixer

2.000

bh

5,400.00

10,800.00

Sealent

0.060 tube

15,000.00

900.00

M' 6.25

7,230.25

1 M' KUSEN PINTU ALUMUNIUM COKLAT TENAGA Tukang

0.043 Oh

85,000.00

3,655.00

131,160.00

138,390.25

100 1

2 Kepala Tukang Pekerja/Buruh tak terampil Mandor

3

4

5

6

0.0043 Oh

87,500.00

376.25

0.043 Oh

70,000.00

3,010.00

0.0021 Oh

90,000.00

189.00

7

BAHAN Kusen Alumunium Coklat

1.100

m'

114,700.00

126,170.00

Skrup Fixer

2.000

bh

5,400.00

10,800.00

Sealent

0.060 tube

15,000.00

900.00 7,230.25

137,870.00

145,100.25

101 1

2

3

4

5

6

7

PEKERJAAN PENGUNCI DAN KACA 6.1

1 BH PASANG KUNCI TANAM BIASA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.500 Oh

85,000.00

42,500.00

0.0100 Oh

87,500.00

875.00

0.010 Oh

70,000.00

700.00

0.0050 Oh

90,000.00

450.00

BAHAN Kunci Tanam biasa

1.000

Bh

295,700.00

Jumlah 6.2

295,700.00 44,525.00

295,700.00

340,225.00

1 BH PASANG ENGSEL PINTU TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Engsel Pintu

1.000

Bh

20,800.00

Jumlah 6.3

20,800.00 15,180.00

20,800.00

35,980.00

1 BH PASANG PEGANGAN PINTU / DOOR HOLDER TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.500 Oh

85,000.00

42,500.00

0.0500 Oh

87,500.00

4,375.00

0.050 Oh

70,000.00

3,500.00

0.00250 Oh

90,000.00

225.00

BAHAN Door Holder

1.000

Bh

301,800.00

Jumlah 6.4

301,800.00 50,600.00

301,800.00

352,400.00

1 BH PASANG ENGSEL JENDELA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.100 Oh

85,000.00

8,500.00

0.0100 Oh

87,500.00

875.00

0.010 Oh

70,000.00

700.00

0.0005 Oh

90,000.00

45.00

BAHAN Engsel Jendela

1.000

Bh

21,500.00

Jumlah 6.5

21,500.00 10,120.00

21,500.00

31,620.00

1 BH PASANG KAIT ANGIN TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Kait Angin

1.000

Bh

16,900.00

Jumlah 6.6

16,900.00 15,180.00

16,900.00

1 BH PASANG REL PINTU DORONG TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.600 Oh

85,000.00

51,000.00

0.0600 Oh

87,500.00

5,250.00

0.060 Oh

70,000.00

4,200.00

0.0030 Oh

90,000.00

270.00

BAHAN Rel Pintu Dorong

1.000

Bh

269,700.00

269,700.00

32,080.00

102 1

2

3

4

Jumlah 6.7

5

6

60,720.00

269,700.00

7

330,420.00

1 M² PASANG KACA BIASA TEBAL 3 MM TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Kaca Biasa 3 mm

1.100 Jumlah



138,800.00

152,680.00 15,180.00

152,680.00

167,860.00

103 1 6.8

2

3

4

5

6

7

1 M² PASANG KACA BIASA TEBAL 5 MM TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Kaca Biasa 5 mm

1.100



196,100.00

Jumlah 6.9

215,710.00 15,180.00

215,710.00

230,890.00

1 M² PASANG KACA RIBEN TEBAL 5 MM TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Kaca Riben 5 mm

1.100



226,300.00

Jumlah 6.10

248,930.00 15,180.00

248,930.00

264,110.00

1 BH PASANG GRENDEL JENDELA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Grendel

1.000

Bh

18,100.00

Jumlah 6.11

18,100.00 15,180.00

18,100.00

33,280.00

1 BH PASANG GRENDEL PINTU TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Grendel Pintu Panjang

1.000

Bh

54,300.00

Jumlah 6.12

54,300.00 15,180.00

54,300.00

69,480.00

1 BH PASANG KACA HIAS/PATRI TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Kaca Patri

1.100

M2

573,500.00

Jumlah 6.13

630,850.00 15,180.00

630,850.00

646,030.00

1 BH PASANG KACA CERMIN TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Kaca Cermin

1.100 Jumlah

M2

226,300.00

248,930.00 15,180.00

248,930.00

264,110.00

104 1

2

3

4

5

6

7

PEKERJAAN PENUTUP LANTAI DAN DINDING 6.1

1 M² PASANG LANTAI TEGEL ABU - ABU TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.130 Oh

85,000.00

0.0130 Oh

87,500.00

11,050.00 1,137.50

0.270 Oh

70,000.00

18,900.00

0.01400 Oh

90,000.00

1,260.00

BAHAN Tegel Abu - Abu

1.043



51,700.00

53,923.10

Semen abu-abu / PC

10.400

Kg

1,386.00

14,414.40

Pasir Brantas (beton)

0.045



276,400.00

Jumlah 6.2

12,438.00 32,347.50

80,775.50

113,123.00

1 M² PASANG LANTAI TEGEL KERAMIK POLOS TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.350 Oh

85,000.00

0.0350 Oh

87,500.00

29,750.00 3,062.50

0.620 Oh

70,000.00

43,400.00

0.03000 Oh

90,000.00

2,700.00

BAHAN Tegel Keramik

1.043



48,000.00

Semen Warna

1.500

Kg

2,802.50

4,203.75

10.000

Kg

1,386.00

13,860.00

0.045



276,400.00

Semen abu-abu / PC Pasir Brantas (beton)

Jumlah 6.3

50,064.00

12,438.00 78,912.50

80,565.75

159,478.25

1 M² PASANG LANTAI TEGEL KERAMIK WARNA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.350 Oh

85,000.00

0.0350 Oh

87,500.00

29,750.00 3,062.50

0.620 Oh

70,000.00

43,400.00

0.03000 Oh

90,000.00

2,700.00

BAHAN Tegel Keramik

1.043



56,500.00

Semen Warna

1.500

Kg

2,802.50

4,203.75

Semen abu-abu / PC

10.000

Kg

1,386.00

13,860.00

Pasir Brantas (beton)

0.045



276,400.00

12,438.00

Jumlah 6.4

58,929.50

78,912.50

89,431.25

168,343.75

1 M' PASANG PLINT KERAMIK ARTISTIK 10 X 20 Cm TENAGA Tukang

0.090 Oh

85,000.00

Kepala Tukang

0.009 Oh

87,500.00

7,650.00 787.50

Pekerja/Buruh tak terampil

0.090 Oh

70,000.00

6,300.00

Mandor

0.005 Oh

90,000.00

450.00

Plint Keramik Artistik

1.050

M'

78,400.00

Semen Warna

0.025

Kg

2,802.50

70.06

Semen abu-abu / PC

1.140

Kg

1,386.00

1,580.04

0.0030



276,400.00

BAHAN

Pasir Brantas (beton)

Jumlah 6.5

82,320.00

829.20 15,187.50

1 M² PASANG LANTAI BATU MARMER PUTIH (100x100) CM TENAGA Tukang

0.350 Oh

85,000.00

29,750.00

Kepala Tukang

0.035 Oh

87,500.00

3,062.50

Pekerja/Buruh tak terampil

0.620 Oh

70,000.00

43,400.00

Mandor

0.030 Oh

90,000.00

2,700.00

84,799.30

99,986.80

105 1

2

3

4

5

6

7

BAHAN Batu Marmer Putih

1.060



327,400.00

Semen Warna

0.650

Kg

2,802.50

1,821.63

Semen abu-abu / PC

8.190

Kg

1,386.00

11,351.34

0.045



276,400.00

Pasir Brantas (beton)

Jumlah

347,044.00

12,438.00 78,912.50

372,654.97

451,567.47

106 1 6.6

2

3

4

5

6

7

1 M² PASANG LANTAI BATU MARMER HITAM (100x100) CM TENAGA Tukang

0.350 Oh

85,000.00

29,750.00

Kepala Tukang

0.035 Oh

87,500.00

3,062.50

Pekerja/Buruh tak terampil

0.620 Oh

70,000.00

43,400.00

Mandor

0.030 Oh

90,000.00

2,700.00

BAHAN Batu Marmer Hitam

1.060



381,900.00

Semen Warna

0.650

Kg

2,802.50

1,821.63

Semen abu-abu / PC

8.190

Kg

1,386.00

11,351.34

0.045



276,400.00

Pasir Brantas (beton)

Jumlah 6.7

404,814.00

12,438.00 78,912.50

430,424.97

509,337.47

1 M² PASANG DINDING KERAMIK POLOS TENAGA Tukang

0.450 Oh

85,000.00

38,250.00

Kepala Tukang

0.045 Oh

87,500.00

3,937.50

Pekerja/Buruh tak terampil

0.600 Oh

70,000.00

42,000.00

Mandor

0.030 Oh

90,000.00

2,700.00

Keramik Dinding Polos

1.020



62,800.00

64,056.00

Semen Warna

1.940

Kg

2,802.50

5,436.85

Semen abu-abu / PC

9.300

Kg

1,386.00

12,889.80

Pasir Brantas (beton)

0.018



276,400.00

BAHAN

Jumlah 6.8

4,975.20 86,887.50

87,357.85

174,245.35

1 M² PASANG DINDING KERAMIK WARNA TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.600 Oh

70,000.00

42,000.00

Mandor

0.030 Oh

90,000.00

2,700.00

Keramik Dinding Warna

1.020



66,000.00

Semen Warna

1.940

Kg

2,802.50

5,436.85

Semen abu-abu / PC

9.300

Kg

1,386.00

12,889.80

0.018



276,400.00

BAHAN

Pasir Brantas (beton)

Jumlah 6.9

67,320.00

4,975.20 86,887.50

90,621.85

177,509.35

1 M² PASANG DINDING BATU MARMER PUTIH (100x100) CM TENAGA Tukang

0.650 Oh

85,000.00

Kepala Tukang

0.065 Oh

87,500.00

55,250.00 5,687.50

Pekerja/Buruh tak terampil

0.720 Oh

70,000.00

50,400.00

Mandor

0.035 Oh

90,000.00

3,150.00

BAHAN Batu Marmer Putih

1.020



327,400.00

Paku

2.000

Bh

1,500.00

3,000.00

Semen abu-abu / PC

12.440

Kg

1,386.00

17,241.84

Pasir Brantas (beton)

0.025



276,400.00

6,910.00

0.650

Kg

2,802.50

Semen Warna

Jumlah 6.10

333,948.00

1,821.63 114,487.50

1 M² PASANG DINDING BATU MARMER HITAM (100x100) CM TENAGA Tukang

0.650 Oh

85,000.00

55,250.00

Kepala Tukang

0.065 Oh

87,500.00

5,687.50

Pekerja/Buruh tak terampil

0.720 Oh

70,000.00

50,400.00

362,921.47

477,408.97

107 1

2 Mandor

3

4

0.035 Oh

90,000.00

5

6

7

3,150.00

BAHAN Batu Marmer Hitam

1.020



381,900.00

389,538.00

Paku

2.000

Bh

1,500.00

3,000.00

Semen abu-abu / PC

12.440

Kg

1,386.00

17,241.84

Pasir Brantas (beton)

0.025



276,400.00

6,910.00

Semen Warna

0.650

Kg

2,802.50

Jumlah

1,821.63 114,487.50

418,511.47

532,998.97

108 1 6.11

2

3

4

5

6

7

1 M² PASANG DINDING BATU TEMPEL TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.350 Oh

85,000.00

29,750.00

0.0350 Oh

87,500.00

3,062.50

0.620 Oh

70,000.00

43,400.00

0.03000 Oh

90,000.00

2,700.00

BAHAN Batu Tempel ( Bobos Warna )

1.100



241,500.00

265,650.00

Semen abu-abu / PC

11.750

Kg

1,386.00

16,285.50

Pasir Brantas (beton)

0.035



276,400.00

9,674.00

Jumlah 6.12

78,912.50

291,609.50

370,522.00

1 M² PASANG DINDING KLINGKER TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.035 Oh

85,000.00

2,975.00

0.0350 Oh

87,500.00

3,062.50

0.620 Oh

70,000.00

43,400.00

0.03000 Oh

90,000.00

2,700.00

BAHAN Klingker

1.020



505,900.00

Paku

0.001

Kg

13,800.00

13.80

12.440

Kg

1,386.00

17,241.84

0.035



276,400.00

Semen abu-abu / PC Pasir Brantas (beton)

Jumlah 6.13

516,018.00

9,674.00 52,137.50

542,947.64

595,085.14

1 M² PASANG PAVING STONE POLOS NON KONTRUKSI TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.250 Oh

85,000.00

21,250.00

0.0250 Oh

87,500.00

2,187.50

0.250 Oh

70,000.00

17,500.00

0.0250 Oh

90,000.00

2,250.00

BAHAN Paving Stone Polos Pasir Lokal

30.000

Bh

1,500.00

0.050

M3

120,700.00

Jumlah 6.14

45,000.00 6,035.00 43,187.50

51,035.00

94,222.50

1 M² PASANG PAVING STONE WARNA NON KONTRUKSI TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.250 Oh

85,000.00

21,250.00

0.0250 Oh

87,500.00

2,187.50

0.250 Oh

70,000.00

17,500.00

0.0250 Oh

90,000.00

2,250.00

BAHAN Paving Stone Warna Pasir Lokal

30.000

Bh

1,600.00

48,000.00

0.050

M3

120,700.00

6,035.00

Jumlah 6.15

43,187.50

54,035.00

97,222.50

1 M2 PASANG PAVING STONE / CONBLOK ABU-ABU TEBAL 6 CM K 175 Tenaga : Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.250 Oh

85,000.00

21,250.00

0.0250 Oh

87,500.00

2,187.50

0.250 Oh

70,000.00

17,500.00

0.0250 Oh

90,000.00

2,250.00

Bahan : Paving Stone / Conblok abu - abu tebal 6 c

Pasir Lokal

50 M2

1,500.00

75,000.00

0.050 M3

120,700.00

6,035.00

Jumlah

43,187.50

81,035.00

124,222.50

109 1 6.16

2

3

4

5

6

7

1 M2 PASANG PAVING STONE / CONBLOK WARNA TEBAL 6 CM K 175 Tenaga : Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.250 Oh

85,000.00

21,250.00

0.0250 Oh

87,500.00

2,187.50

0.250 Oh

70,000.00

17,500.00

0.0250 Oh

90,000.00

2,250.00

Bahan : Paving Stone / Conblok warna tebal 6 cm

Pasir Lokal

50 M2

1,600.00

0.050 M3

120,700.00

Jumlah

80,000.00 6,035.00 43,187.50

86,035.00

129,222.50

110 1 6.17

2

3

4

5

6

7

1 M2 PASANG PAVING STONE / CONBLOK ABU-ABU TEBAL 6 CM K225 Tenaga : Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.250 Oh

85,000.00

21,250.00

0.0250 Oh

87,500.00

2,187.50

0.250 Oh

70,000.00

17,500.00

0.0250 Oh

90,000.00

2,250.00

Bahan : Paving Stone /Conblok abu - abu tebal 6 cm

Pasir Lokal

50 M2

1,800.00

90,000.00

0.050 M3

120,700.00

6,035.00

Jumlah 6.18

43,187.50

96,035.00

139,222.50

1 M2 PASANG PAVING STONE / CONBLOK WARNA TEBAL 6 CM K225 Tenaga : Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.250 Oh

85,000.00

21,250.00

0.0250 Oh

87,500.00

2,187.50

0.250 Oh

70,000.00

17,500.00

0.0250 Oh

90,000.00

2,250.00

Bahan : Paving Stone / Conblok warna tebal 6 cm

Pasir Lokal

50 M2

1,900.00

95,000.00

0.050 M3

120,700.00

6,035.00

Jumlah 6.19

43,187.50

101,035.00

144,222.50

1 M' PASANG STOPER / TOPI USKUP ABU-ABU K.175 TENAGA Tukang Kepala Tukang Buruh terampil Mandor

0.100 Oh

85,000.00

8,500.00

0.0100 Oh

87,500.00

875.00

0.200 Oh

70,000.00

14,000.00

0.0010 Oh

90,000.00

90.00

BAHAN Stoper / Topi uskup t=6cm (K 175)

3.340

Bh

5,500.00

18,370.00

Pasir Lokal

0.050



120,700.00

6,035.00

Jumlah 6.20

23,465.00

24,405.00

47,870.00

1 M' PASANG STOPER / TOPI USKUP ABU-ABU K.225 TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.0100 Oh

87,500.00

875.00

Buruh terampil

0.200 Oh

70,000.00

14,000.00

0.0010 Oh

90,000.00

90.00

Mandor

8,500.00

BAHAN Stoper / Topi uskup t=6cm (K 225)

3.340

Bh

6,300.00

Pasir Lokal

0.050



120,700.00

Jumlah 6.21

21,042.00 6,035.00 23,465.00

27,077.00

50,542.00

1 M' PASANG KANSTIN TRAP UK15.25.40 K-175 TENAGA Mandor

0.001 Oh

85,000.00

85.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Tukang

0.050 Oh

70,000.00

3,500.00

Buruh terampil

0.050 Oh

90,000.00

4,500.00

Kanstin Trap uk. 15.25.40 (me)

2.500

Bh

16,800.00

Semen abu-abu / PC

1.000

kg

1,386.00

1386

Pasir Beton

0.001



276,400.00

276.4

BAHAN

Jumlah 6.22

1 M2 PASANGAN BATAKO ( 1 PC : 5 PSR) TENAGA

42000

8,960.00

43,662.40

52,622.40

111 1

2

3

4

5

Mandor Lapangan

0.05 Oh

85,000.00

Kepala Tukang Batu

0.02 Oh

87,500.00

1,750.00

Tukang Batu

0.24 Oh

70,000.00

16,800.00

Pekerja / Pekerja Tidak Terlatih

0.72 Oh

90,000.00

64,800.00

12.5 Bj

6

7

4,250.00

BAHAN Batako Padat Portland Cement Pasir Beton

4,200.00

52500

1.6 Kg

1,386.00

2217.6

0.05 M3

276,400.00

Jumlah

13820 87,600.00

68,537.60

156,137.60

112 1

2

3

4

5

6

7

PEKERJAAN PENGECATAN 6.1

1 M² MENGIKIS / MENGEROK PERMUKAAN CAT LAMA TENAGA Pekerja/Buruh tak terampil Mandor

0.150 Oh

70,000.00

10,500.00

0.00250 Oh

90,000.00

225.00

BAHAN Soda Api

0.050

Kg

55,300.00

Jumlah 6.2

2,765.00 10,725.00

2,765.00

13,490.00

1 M² MENDEMPUL DAN MENGECAT 2X SELESAI TEMBOK BARU TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.063 Oh

85,000.00

5,355.00

0.0063 Oh

87,500.00

551.25

0.020 Oh

70,000.00

1,400.00

0.00250 Oh

90,000.00

225.00

BAHAN Cat Tembok Penutup 2X

0.260

Kg

23,200.00

Plamir

0.100

Kg

6,400.00

640.00

Cat Dasar

0.100

kg

23,200.00

2,320.00

Jumlah 6.3

6,032.00

7,531.25

8,992.00

16,523.25

1 M² MENGECAT 2X SELESAI TEMBOK LAMA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.042 Oh

85,000.00

3,570.00

0.0042 Oh

87,500.00

367.50

0.028 Oh

70,000.00

1,960.00

0.00250 Oh

90,000.00

225.00

BAHAN Cat Tembok Penutup 2X

0.180

Kg

23,200.00

Cat Dasar

0.120

Kg

23,200.00

Jumlah 6.4

4,176.00 2,784.00 6,122.50

6,960.00

13,082.50

1 M² MENGECAT 2X SELESAI GENTENG BARU TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.063 Oh

85,000.00

0.0063 Oh

87,500.00

5,355.00 551.25

0.020 Oh

70,000.00

1,400.00

0.00250 Oh

90,000.00

225.00

BAHAN Cat Penutup 2X

0.260

Kg

58,500.00

Cat Dasar

0.100

kg

58,500.00

Jumlah 6.5

15,210.00 5,850.00 7,531.25

21,060.00

28,591.25

1 M² MENGECAT 2X SELESAI GENTENG LAMA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.042 Oh

85,000.00

0.0042 Oh

87,500.00

3,570.00 367.50

0.028 Oh

70,000.00

1,960.00

0.00250 Oh

90,000.00

225.00

BAHAN Cat Penutup 2X

0.180

Kg

58,500.00

Cat Dasar

0.120

Kg

58,500.00

Jumlah 6.6

10,530.00 7,020.00 6,122.50

1 M² MENDEMPUL DAN MENGOSOK BIDANG KAYU TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil

0.040 Oh

85,000.00

0.0040 Oh

87,500.00

3,400.00 350.00

0.040 Oh

70,000.00

2,800.00

17,550.00

23,672.50

113 1

2 Mandor

3

4

0.00250 Oh

90,000.00

5

6

7

225.00

BAHAN Plamir

0.080

Kg

26,700.00

2,136.00

Kertas Gosok

0.200

Lbr

3,600.00

720.00

0.020

Kg

28,500.00

Minyak Cat

Jumlah 6.7

570.00 6,775.00

3,426.00

10,201.00

1 M² MENGECAT BIDANG KAYU LAMA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.075 Oh

85,000.00

6,375.00

0.0075 Oh

87,500.00

656.25

0.070 Oh

70,000.00

4,900.00

0.00250 Oh

90,000.00

225.00

BAHAN Plamir

0.150

Kg

26,700.00

4,005.00

Cat Dasar

0.170

Kg

68,800.00

11,696.00

0.170

Kg

68,800.00

Cat Penutup EMCO

Jumlah

11,696.00 12,156.25

27,397.00

39,553.25

114 1 6.8

2

3

4

5

6

7

1 M² MENDEMPUL DAN MENGECAT 2X SELESAI BIDANG KAYU BARU TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.009 Oh

85,000.00

765.00

0.0060 Oh

87,500.00

525.00

0.070 Oh

70,000.00

4,900.00

0.00250 Oh

90,000.00

225.00

BAHAN Cat Many

0.200

Kg

30,100.00

Plamir

0.150

Kg

26,700.00

4,005.00

Cat Dasar

0.170

Kg

68,800.00

11,696.00

0.260

Kg

68,800.00

Cat Penutup EMCO

Jumlah 6.9

6,020.00

17,888.00 6,415.00

39,609.00

46,024.00

1 M² MELABUR BIDANG KAYU DENGAN TEAK OIL TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.063 Oh

85,000.00

5,355.00

0.0630 Oh

87,500.00

5,512.50

0.040 Oh

70,000.00

2,800.00

0.00250 Oh

90,000.00

225.00

BAHAN Teak Oil

0.360

Ltr

10,700.00

Jumlah 6.10

3,852.00 13,892.50

3,852.00

17,744.50

1 M² MELABUR BIDANG KAYU DENGAN PELITUR TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.060 Oh

85,000.00

5,100.00

0.0160 Oh

87,500.00

1,400.00

-

Oh

70,000.00

0.00250 Oh

90,000.00

225.00

BAHAN Pelitur

0.150

Ltr

80,800.00

12,120.00

Pelitur Jadi

0.372

Ltr

84,300.00

31,359.60

Kertas Gosok

2.000

Lbr

3,600.00

7,200.00

Jumlah 6.11

6,725.00

50,679.60

57,404.60

1 M² MELABUR BIDANG KAYU DENGAN RESIDU DAN TER TENAGA Pekerja/Buruh tak terampil Mandor

0.100 Oh

70,000.00

7,000.00

0.00600 Oh

90,000.00

540.00

BAHAN Residu / Ter

0.350

Ltr

21,200.00

Jumlah 6.12

7,420.00 7,540.00

7,420.00

14,960.00

1 M² MELABUR BIDANG KAYU DENGAN VERNIS TENAGA Tukang

0.160 Oh

85,000.00

Kepala Tukang

0.016 Oh

87,500.00

1,400.00

Pekerja/Buruh tak terampil

0.160 Oh

70,000.00

11,200.00

0.00250 Oh

90,000.00

225.00

Mandor

13,600.00

BAHAN Vernis

0.150

Ltr

66,400.00

9,960.00

Dempul

0.050

Kg

42,200.00

2,110.00

Kertas Gosok

0.100

Lbr

3,600.00

360.00

Kuas

0.010

Bh

18,000.00

Jumlah 6.13

180.00 26,425.00

1 M² MENGECAT PERMUKAAN BAJA DENGAN MANY BESI TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

12,610.00

39,035.00

115 1

2

3

4

5

6

Pekerja/Buruh tak terampil

0.020 Oh

70,000.00

1,400.00

Mandor

0.010 Oh

90,000.00

900.00

0.100

Kg

38,800.00

0.010

Bh

18,000.00

7

BAHAN Meny besi Kuas

3,880.00 180.00

Jumlah 6.14

21,050.00

4,060.00

25,110.00

1 M² MENGECAT PERMUKAAN BAJA DENGAN MANY BESI DAN PERANCAH TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.225 Oh

85,000.00

19,125.00

0.0225 Oh

87,500.00

1,968.75

0.250 Oh

70,000.00

17,500.00

0.00750 Oh

90,000.00

675.00

BAHAN Meny besi

0.100

Kg

38,800.00

3,880.00

Kuas

0.010

Bh

18,000.00

180.00

0.002



7,486,000.00

Perancah kayu

Jumlah

14,972.00

58,300.75 19,032.00 TRENGGALEK, 2007 KEPALA DINAS PERUMAHAN DAN PERMUKIMAN TRENGGALEK, PEBRUARI 2017 KABUPATEN TRENGGALEK KEPALA DINAS PEKERJAAN UMUM KEPALA DAN PENATAAN RUANG KABUPATEN TRENGGALEK 39,268.75

Ir. HUSNI HIDAYAT PEMBINA UTAMA MUDA 510 053 573 Ir. JANU RIANTO, MT NIP. 510 053 573 NIP. 19580131 199011 1 001

1

STANDAR NASIONAL INDONESIA BANGUNAN GEDUNG DAN PERUMAHAN ANALISA BIAYA KONSTRUKSI ( ABK ) TH 2017 KABUPATEN TRENGGALEK PEKERJAAN PERSIAPAN

Dataran Tinggi Koefisien

Analisa

Uraian

1

2

6.1

Sat

Volume 3

Harga

Jumlah Harga

Satuan

Upah

Bahan

(Rp.)

(Rp.)

(Rp.)

4

5

6

1 M' PAGAR SEMENTARA DARI KAYU TINGGI 2 M TENAGA Tukang Kayu

0.200

Oh

85,000.00

Kepala Tukang

0.020

Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.400

Oh

70,000.00

28,000.00

Mandor

0.020

Oh

90,000.00

1,800.00

BAHAN Dolken kayu dan sejenis d. 15 - 20 cm P

1.250 Btng

70,500.00

88,125.00

Semen abu-abu / PC

2.500

Kg

1,428.00

3,570.00

Pasir Brantas (beton)

0.005



344,000.00

1,720.00

Koral Beton Split 1 - 2 cm

0.009



343,900.00

3,095.10

Kayu 5 / 7

0.072



7,094,000.00

510,768.00

Residu

0.400

Lt

22,500.00

9,000.00

Paku Usuk

0.060

Kg

19,000.00

Jumlah 6.2

1,140.00 48,550.00

617,418.10

1 M' PAGAR SEMENTARA DARI SENG GELOMBANG TENAGA Tukang Kayu

0.200

Oh

85,000.00

Kepala Tukang

0.020

Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.400

Oh

70,000.00

28,000.00

Mandor

0.020

Oh

90,000.00

1,800.00

BAHAN Dolken Kayu Jati ø 8 - 10 x 4 m

1.250 Btng

70,500.00

88,125.00

Semen abu-abu / PC

2.500

Kg

1,428.00

3,570.00

Pasir Brantas (beton)

0.005



344,000.00

1,720.00

Koral Beton Split 1 - 2 cm

0.009



343,900.00

3,095.10

Seng Gelombang Bjls 28

1.200

Lbr

93,100.00

111,720.00

Kayu 5/7 ( Tahun )

0.072



7,094,000.00

510,768.00

Meny Besi

0.450

Kg

46,600.00

20,970.00

Paku Usuk

0.060

Kg

19,000.00

Jumlah 6.3

1,140.00 48,550.00

741,108.10

1 M' PAGAR SEMENTARA DARI KAWAT DURI TENAGA Tukang Kayu

0.200

Oh

85,000.00

Kepala Tukang

0.020

Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.020

Oh

90,000.00

1,800.00

BAHAN Dolken Kayu Jati ø 8 - 10 x 4 m

1.000 Btng

70,500.00

70,500.00

Semen abu-abu / PC

2.000

Pasir Brantas (beton)

0.005

Kg

1,428.00

2,856.00



344,000.00

Koral Beton Split 1 - 2 cm

1,720.00

0.009



343,900.00

3,095.10

Kawat Duri

25.000

Kg

29,500.00

737,500.00

Paku Usuk

0.060

Kg

19,000.00

1,140.00

Jumlah

41,550.00

816,811.10

2 1 6.4

2

3

4

5

6

1 M' PENGUKURAN DAN PEMASANGAN BOWPLANK TENAGA Tukang Kayu

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100

Oh

70,000.00

7,000.00

Mandor

0.005

Oh

90,000.00

450.00

Usuk Kayu Bouplank

0.012



7,094,000.00

85,128.00

Papan

0.007



7,245,000.00

50,715.00

Paku Usuk

0.020

Kg

19,000.00

BAHAN

Jumlah 6.5

Tukang Kayu

2.000

Oh

85,000.00

170,000.00

Tukang batu

1.000

Oh

85,000.00

85,000.00

Kepala Tukang

0.300

Oh

87,500.00

26,250.00

Pekerja/Buruh tak terampil

2.000

Oh

70,000.00

140,000.00

Mandor BAHAN

0.050

Oh

90,000.00

4,500.00

70,500.00

88,125.00

35.000

Kg

1,428.00

49,980.00

Pasir Lokal

0.150



120,700.00

18,105.00

Pasir Brantas (beton)

0.100



344,000.00

34,400.00

Koral Beton Split 1 - 2 cm

0.150



343,900.00

51,585.00

Seng Gelombang Bjls 28

0.750

Lbr

93,100.00

69,825.00

Semen abu-abu / PC

Kayu 5/7

1.250 Btng

0.180



7,094,000.00

1,276,920.00

30.000

Bh

1,260.00

37,800.00

Bingkai Nako

0.200



288,900.00

57,780.00

Kaca Polos

0.080



197,700.00

15,816.00

Kunci tanam

0.150

Bh

301,800.00

45,270.00

Triplek 4 mm

0.060

Lbr

83,200.00

4,992.00

Paku Usuk

0.850

Kg

19,000.00

16,150.00

Bata Merah

Jumlah

425,750.00

1,766,748.00

1 M² PEMBUATAN GUDANG SEMEN DAN ALAT - ALAT TENAGA Tukang Kayu

2.000

Oh

85,000.00

170,000.00

Kepala Tukang

0.200

Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor BAHAN

0.050

Oh

90,000.00

4,500.00

Dolken Kayu Jati ø 8 - 10 x 4 m

70,500.00

119,850.00

Semen abu-abu / PC

10.500

1.700 Btng Kg

1,428.00

14,994.00

Pasir Brantas (beton)

0.030



344,000.00

10,320.00

Koral Beton Split 1 - 2 cm

0.050



343,900.00

17,195.00

Seng Gelombang Bjls 28

1.500

Lbr

93,100.00

139,650.00

Kayu 5/7

0.210



7,094,000.00

1,489,740.00

Paku Usuk

0.300

Kg

19,000.00

Jumlah 6.7

136,223.00

1 M² PEMBUATAN KANTOR SEMENTARA DGN LANTAI PLESTERAN TENAGA

Dolken Kayu Jati ø 8 - 10 x 4 m

6.6

380.00 16,825.00

5,700.00 262,000.00

1,797,449.00

1 M² PEMBUATAN PEMBUATAN RUMAH JAGA / KONSTRUKSI KAYU TENAGA Tukang Kayu

1.500

Oh

85,000.00

127,500.00

Kepala Tukang

0.150

Oh

87,500.00

13,125.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor BAHAN

0.050

Oh

90,000.00

4,500.00

Dolken Kayu Jati ø 8 - 10 x 4 m

3.000 Btng

70,500.00

211,500.00

Seng Gelombang Bjls 28

1.500

Lbr

93,100.00

139,650.00

Kayu 5/7 ( Tahun )

0.276



7,094,000.00

1,957,944.00

Paku Usuk

0.700

Kg

19,000.00

13,300.00

3 1

2

3 Jumlah

4

5 215,125.00

6 2,322,394.00

4 1 6.8

2

3

4

Pekerja/Buruh tak terampil

0.100

Oh

70,000.00

Mandor

0.050

Oh

90,000.00

Jumlah 6.9

5

6

1 M² PEMBERSIHAN LAPANGAN DAN PERATAAN TENAGA 7,000.00 4,500.00 11,500.00

1 M² PEMBUATAN BEDENG PEKERJA / BURUH TENAGA Tukang Kayu

2.000

Oh

85,000.00

170,000.00

Kepala Tukang

0.200

Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

BAHAN Dolken Kayu Jati ø 8 - 10 x 4 m

70,500.00

88,125.00

Semen abu-abu / PC

18.000

1.250 Btng Kg

1,428.00

25,704.00

Pasir Brantas (beton)

0.030



344,000.00

10,320.00

Koral Beton Split 1 - 2 cm

0.050



343,900.00

17,195.00

Seng Gelombang Bjls 32

1.500

Lbr

139,400.00

209,100.00

Kayu 5/7

0.186



7,094,000.00

1,319,484.00

Triplek 4 mm

1.350

Lbr

83,200.00

112,320.00

Paku Usuk

0.300

Kg

19,000.00

Jumlah 6.10

5,700.00 262,000.00

1,787,948.00

1 M² PEMBUATAN BAK ADUKAN ( 40 X 50 X 20 ) CM TENAGA Tukang Kayu

0.300

Oh

85,000.00

25,500.00

0.0015

Oh

90,000.00

135.00

Papan Kayu Biasa

0.030



7,245,000.00

217,350.00

Kayu 5/7

0.001



7,094,000.00

7,094.00

0.080

Kg

19,000.00

Mandor BAHAN

Paku Usuk

Jumlah 6.12

1,520.00 25,635.00

225,964.00

1 M² PEMBUATAN JALAN SEMENTARA TEBAL 15 CM TENAGA Pekerja/Buruh tak terampil

0.100

Oh

70,000.00

7,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

Batu belah 15/20 cm

0.150



288,700.00

43,305.00

Batu pecah 5 - 7 cm

0.090



288,700.00

25,983.00

Pasir Urug

0.010



150,800.00

BAHAN

Jumlah 6.13

1,508.00 11,500.00

70,796.00

1 M³ PEMBONGKARAN BETON BERTULANG TENAGA Pekerja/Buruh tak terampil

6.667

Oh

70,000.00

Mandor

0.333

Oh

90,000.00

Jumlah 6.14

466,690.00 29,970.00 496,660.00

1 M³ PEMBONGKARAN DINDING TEMBOK BATA MERAH TENAGA Pekerja/Buruh tak terampil

6.667

Oh

70,000.00

Mandor

0.033

Oh

90,000.00

Jumlah 6.15

466,690.00 2,970.00 469,660.00

1 M² PAS. PAGAR KAWAT JARING GALVANIS TINGGI 1 M TENAGA Tukang Kayu

0.042

Oh

85,000.00

Kepala Tukang

0.004

Oh

87,500.00

3,570.00 350.00

Pekerja/Buruh tak terampil

0.042

Oh

70,000.00

2,940.00

Mandor

0.002

Oh

90,000.00

180.00

1.100

M2

21,700.00

BAHAN Kawat Ram ( Jaring )

Jumlah

23,870.00 7,040.00

23,870.00

5 1 6.16

2

3

4

5

6

1 M² PAS. PAGAR KAWAT JARING GALVANIS TINGGI 1 M TENAGA Tukang Kayu

0.125

Oh

85,000.00

Kepala Tukang

0.012

Oh

87,500.00

10,625.00 1,050.00

Pekerja/Buruh tak terampil

0.375

Oh

70,000.00

26,250.00

Mandor

0.019

Oh

90,000.00

1,710.00

0.525 Btg

BAHAN Kolom Beton Pracetak

389,200.00

204,330.00

Semen abu-abu / PC

10.500

Kg

1,428.00

14,994.00

Pasir Brantas (beton)

0.030



344,000.00

10,320.00

Koral Beton Split 1 - 2 Cm

0.050



343,900.00

17,195.00

Kawat Ram ( Jaring )

1.100

M2

21,700.00

23,870.00

Jumlah 6.16

39,635.00

270,709.00

1 M² PAS. PAGAR PANEL BETON TINGGI 1 M TENAGA Tukang Kayu

0.125

Oh

85,000.00

Kepala Tukang

0.012

Oh

87,500.00

10,625.00 1,050.00

Pekerja/Buruh tak terampil

0.375

Oh

70,000.00

26,250.00

Mandor

0.019

Oh

90,000.00

1,710.00

0.986

Lbr

225,700.00

222,540.20

0.525 Btg

BAHAN Panel Beton Pracetak Kolom Beton Pracetak

389,200.00

204,330.00

Semen abu-abu / PC

10.500

Kg

1,428.00

14,994.00

Pasir Brantas (beton)

0.030



344,000.00

10,320.00

Koral Beton Split 1 - 2 Cm

0.050



343,900.00

17,195.00 -

Jumlah

39,635.00

PEKERJAAN TANAH 6.1

1M³ GALIAN TANAH BIASA SEDALAM 1 M Pekerja/Buruh tak terampil

0.750

Oh

70,000.00

52,500.00

Mandor

0.025

Oh

90,000.00

2,250.00

Jumlah 6.2

54,750.00

1M³ GALIAN TANAH BIASA SEDALAM 2M Pekerja/Buruh tak terampil

0.900

Oh

70,000.00

63,000.00

Mandor

0.045

Oh

90,000.00

4,050.00

Jumlah 6.3

67,050.00

1M³ GALIAN TANAH BIASA SEDALAM 3 M Pekerja/Buruh tak terampil Mandor

1.050

Oh

70,000.00

0.067

Oh

90,000.00

Jumlah 6.4

1M³ GALIAN TANAH KERAS SEDALAM 1 M Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

Mandor

0.032

Oh

90,000.00

70,000.00 2,880.00 72,880.00

1M³ GALIAN TANAH CADAS SEDALAM 1 M Pekerja/Buruh tak terampil Mandor

1.500

Oh

70,000.00

0.060

Oh

90,000.00

Jumlah 6.6

6,030.00 79,530.00

Jumlah 6.5

73,500.00

105,000.00 5,400.00 110,400.00

1M³ GALIAN TANAH LUMPUR SEDALAM 1 M Pekerja/Buruh tak terampil

1.200

Oh

70,000.00

Mandor

0.045

Oh

90,000.00

Jumlah

84,000.00 4,050.00 88,050.00

469,379.20

6 1 6.7

2

3

4

Pekerja/Buruh tak terampil Mandor

0.050

Oh

70,000.00

0.005

Oh

90,000.00

Jumlah 6.8

Pekerja/Buruh tak terampil

0.516

Oh

70,000.00

Mandor

0.050

Oh

90,000.00

450.00

36,120.00 4,500.00 40,620.00

1M² URUGAN TANAH KEMBALI Pekerja/Buruh tak terampil

0.192

Oh

70,000.00

Mandor

0.019

Oh

90,000.00

13,440.00 1,710.00 15,150.00

1M³ PEMADATAN TANAH (Per 20 cm) Pekerja/Buruh tak terampil

0.500

Oh

70,000.00

Mandor

0.050

Oh

90,000.00

Jumlah 6.11

3,500.00

1M³ PEMBUANGAN TANAH SEJAUH 150 M

Jumlah 6.10

6

3,950.00

Jumlah 6.9

5

1M² PEKERJAAN STRIPING TANAH SETINGGI 1 M

35,000.00 4,500.00 39,500.00

1M³ URUGAN TANAH BIASA TENAGA Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.010

Oh

90,000.00

900.00

1.200



84,500.00

BAHAN Tanah Biasa

Jumlah 6.12

101,400.00 21,900.00

101,400.00

1M³ URUGAN TANAH PILIHAN TENAGA Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.010

Oh

90,000.00

900.00

1.200



81,900.00

BAHAN Tanah Pilihan

Jumlah 6.13

98,280.00 21,900.00

98,280.00

1M³ URUGAN PASIR TENAGA Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.010

Oh

90,000.00

900.00

1.200



150,800.00

BAHAN Pasir Urug

Jumlah 6.14

180,960.00 21,900.00

180,960.00

1M³ URUGAN SIRTU TENAGA Pekerja/Buruh tak terampil

0.250

Oh

70,000.00

17,500.00

Mandor BAHAN

0.025

Oh

90,000.00

2,250.00

1.200



126,000.00

Sirtu Urug

Jumlah 6.15

151,200.00 19,750.00

151,200.00

1M³ LAPISAN PUDEL CAMP. 1 kp : 3 psr : 7 TL . TENAGA Tukang

0.400

Oh

85,000.00

Kepala Tukang

0.040

Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.800

Oh

70,000.00

56,000.00

Mandor BAHAN

0.080

Oh

90,000.00

7,200.00

Pasir Urug

0.400



150,800.00

60,320.00

Kapur Pasang

0.135



806,600.00

108,891.00

Tanah Liat

0.948



75,600.00

Jumlah

34,000.00

71,668.80 100,700.00

240,879.80

7 1 6.16

2

3

4

5

6

1M³ LAPISAN PUDEL CAMP. 1 kp : 5 TL . TENAGA Tukang

0.400

Oh

85,000.00

Kepala Tukang

0.040

Oh

87,500.00

34,000.00 3,500.00

Pekerja/Buruh tak terampil

0.800

Oh

70,000.00

56,000.00

Mandor

0.080

Oh

90,000.00

7,200.00

0.248



806,600.00

1.240



75,600.00

BAHAN Kapur Pasang Tanah Liat

Jumlah 6.17

200,036.80 93,744.00 100,700.00

293,780.80

1M2 PASANG LAPISAN IJUK TEBAL 10 CM TENAGA Pekerja/Buruh tak terampil

0.150

Oh

70,000.00

10,500.00

Mandor

0.015

Oh

90,000.00

1,350.00

6.000 Kg

22,600.00

BAHAN IJUK

Jumlah 6.18

135,600.00 11,850.00

135,600.00

1M² PEMBUATAN JALAN SEMENTARA TEBAL 25 CM TENAGA Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.100

Oh

90,000.00

9,000.00

Batu Belah 15/25 cm

0.275



288,700.00

79,392.50

Batu Pecah 5 - 7

0.030



288,700.00

8,661.00

0.050



150,800.00

BAHAN

Pasir Urug

Jumlah

7,540.00 79,000.00

95,593.50

PEKERJAAN PASANGAN PONDASI BATU BELAH Pasir Brantas (beton) 6.1

1 M³ PAS. POND. BATU BELAH CAM 1 Pc : 1 Psr TENAGA Tukang

0.600

Oh

85,000.00

51,000.00

Kepala Tukang

0.060

Oh

87,500.00

5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

BAHAN Batu Belah 15/20 cm

1.200



288,700.00

346,440.00

Semen abu-abu / PC

392.000

Kg

1,428.00

559,776.00

Pasir Brantas (beton)

0.314



344,000.00

108,016.00

Jumlah 6.2

168,000.00

1,014,232.00

1 M³ PAS. POND. BATU BELAH CAM 1 Pc : 2 Psr TENAGA Tukang

0.600

Oh

85,000.00

51,000.00

Kepala Tukang

0.060

Oh

87,500.00

5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

BAHAN Batu Belah 15/20 cm

1.200



288,700.00

346,440.00

Semen abu-abu / PC

267.000

Kg

1,428.00

381,276.00

Pasir Brantas (beton)

0.427



344,000.00

146,888.00

Jumlah

168,000.00

874,604.00

8 1 6.3

2

3

4

5

6

1 M³ PAS. POND. BATU BELAH CAM 1 Pc : 3 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

51,000.00 5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

Batu Belah 15/20 cm

1.200



288,700.00

346,440.00

Semen abu-abu / PC

202.000

Kg

1,428.00

288,456.00

Pasir Brantas (beton)

0.485



344,000.00

BAHAN

Jumlah 6.4

166,840.00 168,000.00

801,736.00

1 M³ PAS. POND. BATU BELAH CAM 1 Pc : 4 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

51,000.00 5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

Batu Belah 15/20 cm

1.200



288,700.00

346,440.00

Semen abu-abu / PC

163.000

Kg

1,428.00

232,764.00

Pasir Brantas (beton)

0.520



344,000.00

BAHAN

Jumlah 6.5

178,880.00 168,000.00

758,084.00

1 M³ PAS. POND. BATU BELAH CAM 1 Pc : 5 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

51,000.00 5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

Batu Belah 15/20 cm

1.200



288,700.00

346,440.00

Semen abu-abu / PC

136.000

Kg

1,428.00

194,208.00

Pasir Brantas (beton)

0.544



344,000.00

BAHAN

Jumlah 6.6

187,136.00 168,000.00

727,784.00

1 M³ PAS. POND. BATU BELAH CAM 1 Pc : 6 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

51,000.00 5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

BAHAN Batu Belah 15/20 cm

1.200



288,700.00

346,440.00

Semen abu-abu / PC

117.000

Kg

1,428.00

167,076.00

Pasir Brantas (beton)

0.561



344,000.00

Jumlah 6.7

192,984.00 168,000.00

706,500.00

1 M³ PAS. POND. BATU BELAH CAM 1 Pc : 8 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

51,000.00 5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

BAHAN Batu Belah 15/20 cm

1.200



288,700.00

346,440.00

Semen abu-abu / PC

91.000

Kg

1,428.00

129,948.00

Pasir Brantas (beton)

0.584



344,000.00

Jumlah

200,896.00 168,000.00

677,284.00

9 1

2

3

4

5

6

Pasir Brantas (beton) 6.8

1 M³ PAS. POND. BATU BELAH CAM 1 Kp :1Sm ; 1 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor BAHAN

0.075

Oh

90,000.00

6,750.00

Batu Belah 15/20 cm

1.200



288,700.00

346,440.00

Kapur Pasang

0.229



806,600.00

184,711.40

Semen Merah

0.229



239,500.00

54,845.50

Pasir Brantas (beton)

0.544



344,000.00

187,136.00

Jumlah 6.9

51,000.00

168,000.00

773,132.90

1 M³ PAS. POND. BATU BELAH CAM 1 Kp :1Sm ; 2 Psr TENAGA Tukang

0.600

Oh

85,000.00

51,000.00

Kepala Tukang

0.060

Oh

87,500.00

5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

Batu Belah 15/20 cm

1.200



288,700.00

346,440.00

Kapur Pasang

0.170



806,600.00

137,122.00

Semen Merah

0.170



239,500.00

40,715.00

0.340



344,000.00

BAHAN

Pasir Brantas (beton)

Jumlah 6.10

116,960.00 168,000.00

641,237.00

1 M³ PAS. POND. BATU BELAH CAM 1Pc; 3 Kp ; 10 Psr TENAGA Tukang

0.600

Oh

85,000.00

51,000.00

Kepala Tukang

0.060

Oh

87,500.00

5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

BAHAN Batu Belah 15/20 cm

1.200



288,700.00

346,440.00

61.000

Kg

1,428.00

87,108.00

Kapur Pasang

0.147



806,600.00

118,570.20

Pasir Brantas (beton)

0.492



344,000.00

169,248.00

Semen Pc

Jumlah 6.11

168,000.00

721,366.20

1 M³ PAS. POND. BATU BELAH CAM 1Pc; 1/4 Kp ; 4 Psr TENAGA Tukang

0.600

Oh

85,000.00

Kepala Tukang

0.060

Oh

87,500.00

51,000.00 5,250.00

Pekerja/Buruh tak terampil

1.500

Oh

70,000.00

105,000.00

Mandor

0.075

Oh

90,000.00

6,750.00

1.200



288,700.00

346,440.00 222,768.00

BAHAN Batu Belah 15/20 cm Semen Pc

156.000

Kg

1,428.00

Kapur Pasang

0.032



806,600.00

25,811.20

Pasir Brantas (beton)

0.584



344,000.00

200,896.00

Jumlah 6.12

168,000.00

795,915.20

1 M³ PAS. POND. BATU BELAH KOSONGAN TENAGA Tukang

0.390

Oh

85,000.00

Kepala Tukang

0.039

Oh

87,500.00

33,150.00 3,412.50

Pekerja/Buruh tak terampil

0.780

Oh

70,000.00

54,600.00

Mandor

0.039

Oh

90,000.00

3,510.00

Batu Belah 15/20 cm

1.200



288,700.00

Pasir Urug

0.432



150,800.00

BAHAN

Jumlah

346,440.00 65,145.60 94,672.50

411,585.60

10 1 6.13

2

3

4

5

6

1 M³ PAS. POND. SUMURAN dia. 100 cm. TENAGA Tukang

0.300

Oh

85,000.00

Kepala Tukang

0.030

Oh

87,500.00

25,500.00 2,625.00

Pekerja/Buruh tak terampil

2.380

Oh

70,000.00

166,600.00

Mandor

0.080

Oh

90,000.00

7,200.00

0.450



288,700.00

129,915.00

BAHAN Batu Belah 15/20 cm Semen Pc

194.000

Kg

1,428.00

277,032.00

Pasir Brantas (beton)

0.312



344,000.00

107,328.00

Koral Beton Split 1 - 2 cm.

0.468



343,900.00

Jumlah 6.14

160,945.20 201,925.00

675,220.20

1 M' PEMB. TIANG PANCANG ( 40 x 40 ) CM BETON BERTULANG TENAGA Tukang Batu

0.670

Oh

85,000.00

Kepala Tukang

0.067

Oh

87,500.00

56,950.00 5,862.50

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

BAHAN Pasir Urug

0.019



150,800.00

2,865.20

Semen Pc

60.500

Kg

1,428.00

86,394.00

0.094



344,000.00

32,336.00

Pasir Brantas (beton) Koral Beton Split 1 - 2 cm.

0.150



343,900.00

51,585.00

45.000

Kg

12,200.00

549,000.00

Kawat Tali ( Bendrat )

0.900

Kg

17,600.00

15,840.00

Kayu Kaso 5 / 7 cm

0.032



7,094,000.00

227,008.00

Paku

0.120

Kg

19,000.00

2,280.00

Minyak Begesting

0.090

Lt

43,000.00

3,870.00

0.240

Kg

9,600.00

Besi Beton

Plamur Tembok

Jumlah 6.15

2,304.00 137,312.50

973,482.20

1 M' PEMB. TIANG PANCANG ( 35 x 35 ) CM BETON BERTULANG TENAGA Tukang Batu

0.500

Oh

85,000.00

42,500.00

Kepala Tukang

0.050

Oh

87,500.00

4,375.00

Pekerja/Buruh tak terampil

0.800

Oh

70,000.00

56,000.00

Mandor

0.040

Oh

90,000.00

3,600.00

BAHAN Pasir Urug

0.016



150,800.00

2,412.80

Semen Pc

49.000

Kg

1,428.00

69,972.00

Pasir Brantas (beton)

0.080



344,000.00

27,520.00

Koral Beton Split 1 - 2 cm.

0.125



343,900.00

42,987.50

34.500

Kg

12,200.00

420,900.00

Kawat Tali ( Bendrat )

0.700

Kg

17,600.00

12,320.00

Kayu Kaso 5 / 7 cm

0.027



7,094,000.00

191,538.00

Paku

0.120

Kg

19,000.00

2,280.00

Minyak Begesting

0.090

Lt

43,000.00

3,870.00

Plamur Tembok

0.200

Kg

9,600.00

Besi Beton

Jumlah

1,920.00 106,475.00

775,720.30

11 1

2

3

4

5

6

PEKERJAAN PASANGAN BATA MERAH Pasir Brantas (beton) ( TEBAL PASANGAN 1/2 BT ) 6.1

1 M² PAS. BATA MERAH CAM 1 Pc : 1 Psr TENAGA Tukang

0.100

Oh

85,000.00

8,500.00

Kepala Tukang

0.010

Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.320

Oh

70,000.00

22,400.00

Mandor

0.015

Oh

90,000.00

1,350.00

Bata Merah

70.000

Biji

1,260.00

88,200.00

Semen abu-abu / PC

27.800

Kg

1,428.00

39,698.40

0.028



344,000.00

BAHAN

Pasir Brantas (beton)

Jumlah 6.2

9,632.00 33,125.00

137,530.40

1 M² PAS. BATA MERAH CAM 1 Pc : 2 Psr TENAGA Tukang

0.100

Oh

85,000.00

8,500.00

Kepala Tukang

0.010

Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

Bata Merah

70.000

Biji

1,260.00

88,200.00

Semen abu-abu / PC

18.950

Kg

1,428.00

27,060.60

0.038



344,000.00

BAHAN

Pasir Brantas (beton)

Jumlah 6.3

13,072.00 31,725.00

128,332.60

1 M² PAS. BATA MERAH CAM 1 Pc : 3 Psr TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

Bata Merah

70.000

Biji

1,260.00

88,200.00

Semen abu-abu / PC

14.370

Kg

1,428.00

20,520.36

Pasir Brantas (beton)

0.040



344,000.00

BAHAN

Jumlah 6.4

13,760.00 31,725.00

122,480.36

1 M² PAS. BATA MERAH CAM 1 Pc : 4 Psr TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

Bata Merah

70.000

Biji

1,260.00

88,200.00

Semen abu-abu / PC

11.500

Kg

1,428.00

16,422.00

Pasir Brantas (beton)

0.043



344,000.00

BAHAN

Jumlah 6.5

14,792.00 31,725.00

119,414.00

1 M² PAS. BATA MERAH CAM 1 Pc : 5 Psr TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

BAHAN Bata Merah

70.000

Biji

1,260.00

88,200.00

Semen abu-abu / PC

9.680

Kg

1,428.00

13,823.04

Pasir Brantas (beton)

0.045



344,000.00

Jumlah

15,480.00 31,725.00

117,503.04

12 1 6.6

2

3

4

5

6

1 M² PAS. BATA MERAH CAM 1 Pc : 6 Psr TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

70.000

Biji

1,260.00

Semen abu-abu / PC

8.320

Kg

1,428.00

11,880.96

Pasir Brantas (beton)

0.049



344,000.00

16,856.00

BAHAN Bata Merah

Jumlah 6.7

88,200.00

31,725.00

116,936.96

1 M² PAS. BATA MERAH CAM 1 Pc : 8 Psr TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

70.000

Biji

1,260.00

Semen abu-abu / PC

6.500

Kg

1,428.00

9,282.00

Pasir Brantas (beton)

0.050



344,000.00

17,200.00

BAHAN Bata Merah

Jumlah 6.8

88,200.00

31,725.00

114,682.00

1 M² PAS. BATA MERAH CAM 1 Kp : 1 Sm ; 1Psr TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

BAHAN Bata Merah

70.000

Biji

1,260.00

88,200.00

Kapur Pasang

0.018



806,600.00

14,518.80

Semen Merah

0.018



239,500.00

4,311.00

Pasir Brantas (beton)

0.018



344,000.00

6,192.00

Jumlah 6.9

31,725.00

113,221.80

1 M² PAS. BATA MERAH CAM 1 Kp : 1 Sm ; 2Psr TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

BAHAN Bata Merah

70.000

Biji

1,260.00

88,200.00

Kapur Pasang

0.014



806,600.00

11,292.40

Semen Merah

0.014



239,500.00

3,353.00

0.028



344,000.00

Pasir Brantas (beton)

Jumlah 6.10

9,632.00 31,725.00

112,477.40

1 M² PAS. BATA MERAH CAM 1 Pc : 3 Kp ; 10 Psr TENAGA Tukang

0.100

Oh

85,000.00

8,500.00

Kepala Tukang

0.010

Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

BAHAN Bata Merah

70.000

Biji

1,260.00

88,200.00

Semen abu-abu / PC

4.500

Kg

1,428.00

6,426.00

Kapur Pasang

0.015



806,600.00

12,099.00

Pasir Brantas (beton)

0.050



344,000.00

Jumlah

17,200.00 31,725.00

123,925.00

13 1

2

3

4

5

6

14 1

2

3

4

5

6

Pasir Brantas (beton) ( TEBAL PASANGAN 1 BT ) 6.11

1 M² PAS. . BATA MERAH CAM 1 Pc : 2 Psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

17,000.00

Kepala Tukang

0.020

Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

140.000

Biji

1,260.00

176,400.00

43.500

Kg

1,428.00

62,118.00

0.080



344,000.00

BAHAN Bata Merah Semen abu-abu / PC Pasir Brantas (beton)

Jumlah 6.12

27,520.00 63,450.00

266,038.00

1 M² PAS. . BATA MERAH CAM 1 Pc : 3 Psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

17,000.00

Kepala Tukang

0.020

Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

140.000

Biji

1,260.00

176,400.00

32.950

Kg

1,428.00

47,052.60

0.091



344,000.00

BAHAN Bata Merah Semen abu-abu / PC Pasir Brantas (beton)

Jumlah 6.13

31,304.00 63,450.00

254,756.60

1 M² PAS. . BATA MERAH CAM 1 Pc : 4 Psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

Kepala Tukang

0.020

Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

BAHAN Bata Merah

140.000

Biji

1,260.00

176,400.00

Semen abu-abu / PC

26.550

Kg

1,428.00

37,913.40

Pasir Brantas (beton)

0.093



344,000.00

Jumlah 6.14

31,992.00 63,450.00

246,305.40

1 M² PAS. . BATA MERAH CAM 1 Pc : 5 Psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

Kepala Tukang

0.020

Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

BAHAN Bata Merah

140.000

Biji

1,260.00

176,400.00

Semen abu-abu / PC

22.200

Kg

1,428.00

31,701.60

Pasir Brantas (beton)

0.102



344,000.00

Jumlah 6.15

35,088.00 63,450.00

243,189.60

1 M² PAS. . BATA MERAH CAM 1 Pc : 6 Psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

Kepala Tukang

0.020

Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

BAHAN Bata Merah

140.000

Biji

1,260.00

176,400.00

Semen abu-abu / PC

22.200

Kg

1,428.00

31,701.60

Pasir Brantas (beton)

0.102



344,000.00

Jumlah

35,088.00 63,450.00

243,189.60

15 1 6.16

2

3

4

5

6

1 M² PAS. . BATA MERAH CAM 1 Pc : 3Kp ; 10 Psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

Kepala Tukang

0.020

Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

140.000

Biji

1,260.00

176,400.00

Semen abu-abu / PC

10.080

Kg

1,428.00

14,394.24

Kapur Pasang

0.0275



806,600.00

22,181.50

Pasir Brantas (beton)

0.0925



344,000.00

BAHAN Bata Merah

Jumlah 6.17

31,820.00 63,450.00

244,795.74

1 M² PAS. . BATA MERAH CAM 1 kp : 1 sm : 1 psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

Kepala Tukang

0.020

Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

BAHAN Bata Merah

140.000

Biji

1,260.00

176,400.00

Kapur Pasang

0.018



806,600.00

14,518.80

Semen merah

0.0180



239,500.00

4,311.00

Pasir Brantas (beton)

0.0180



344,000.00

6,192.00

Jumlah 6.18

63,450.00

201,421.80

1 M² PAS. . BATA MERAH CAM 1 kp : 1 sm : 2 psr ( 1 BT ) TENAGA Tukang

0.200

Oh

85,000.00

17,000.00

Kepala Tukang

0.020

Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.600

Oh

70,000.00

42,000.00

Mandor

0.030

Oh

90,000.00

2,700.00

BAHAN Bata Merah

140.000

Biji

1,260.00

176,400.00

Kapur Pasang

0.014



806,600.00

11,292.40

Semen merah

0.0140



239,500.00

3,353.00

Pasir Brantas (beton)

0.0280



344,000.00

Jumlah 6.19

9,632.00 63,450.00

200,677.40

1 M² PAS. ROSTER / TERAWANG ( 1/2 BT) CAM 1PC : 4PSR UK 20 X 20 TENAGA Tukang

0.100

Oh

85,000.00

Kepala Tukang

0.010

Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

Terawang (Roster)

30.000

Biji

26,500.00

795,000.00

Semen abu-abu / PC

11.000

Kg

1,428.00

15,708.00

Pasir Brantas (beton)

0.0350



344,000.00

12,040.00

BAHAN

Jumlah

31,725.00

822,748.00

16 1

2

3

4

5

6

PEKERJAAN PLESTERAN Pasir Brantas (beton) 6.1

1 M² PLESTERAN CAM 1 Pc ; 1 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.150

Oh

85,000.00

12,750.00

Kepala Tukang

0.015

Oh

87,500.00

1,312.50

Pekerja/Buruh tak terampil

0.200

Oh

70,000.00

14,000.00

Mandor

0.010

Oh

90,000.00

900.00

Semen abu-abu / PC

15.504

Kg

1,428.00

22,139.71

Pasir Brantas (beton)

0.016



344,000.00

5,504.00

BAHAN

Jumlah 6.2

28,962.50

27,643.71

1 M² PLESTERAN CAM 1 Pc ; 2 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.150

Oh

85,000.00

Kepala Tukang

0.015

Oh

87,500.00

12,750.00 1,312.50

Pekerja/Buruh tak terampil

0.200

Oh

70,000.00

14,000.00

Mandor

0.010

Oh

90,000.00

900.00

Semen abu-abu / PC

10.224

Kg

1,428.00

Pasir Brantas (beton)

0.020



344,000.00

BAHAN

Jumlah 6.3

14,599.87 6,880.00 28,962.50

21,479.87

1 M² PLESTERAN CAM 1 Pc ; 3Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.150

Oh

85,000.00

Kepala Tukang

0.015

Oh

87,500.00

12,750.00 1,312.50

Pekerja/Buruh tak terampil

0.200

Oh

70,000.00

14,000.00

Mandor

0.010

Oh

90,000.00

900.00

Semen abu-abu / PC

7.776

Kg

1,428.00

Pasir Brantas (beton)

0.023



344,000.00

BAHAN

Jumlah 6.4

11,104.13 7,912.00 28,962.50

19,016.13

1 M² PLESTERAN CAM 1 Pc ; 4 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.150

Oh

85,000.00

Kepala Tukang

0.015

Oh

87,500.00

12,750.00 1,312.50

Pekerja/Buruh tak terampil

0.200

Oh

70,000.00

14,000.00

Mandor

0.010

Oh

90,000.00

900.00

Semen abu-abu / PC

6.240

Kg

1,428.00

Pasir Brantas (beton)

0.024



344,000.00

BAHAN

Jumlah 6.5

8,910.72 8,256.00 28,962.50

17,166.72

1 M² PLESTERAN CAM 1 Pc ; 5 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.150

Oh

85,000.00

Kepala Tukang

0.015

Oh

87,500.00

12,750.00 1,312.50

Pekerja/Buruh tak terampil

0.200

Oh

70,000.00

14,000.00

Mandor

0.010

Oh

90,000.00

900.00

5.184

Kg

1,428.00

0.026



344,000.00

BAHAN Semen abu-abu / PC Pasir Brantas (beton)

Jumlah 6.6

7,402.75 8,944.00 28,962.50

1 M² PLESTERAN CAM 1 Pc ; 6 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.150

Oh

85,000.00

Kepala Tukang

0.015

Oh

87,500.00

12,750.00 1,312.50

Pekerja/Buruh tak terampil

0.200

Oh

70,000.00

14,000.00

Mandor

0.010

Oh

90,000.00

900.00

16,346.75

17 1

2

3

4

5

6

BAHAN Semen abu-abu / PC Pasir Brantas (beton)

4.416



1,428.00

0.027



344,000.00

Jumlah

6,306.05 9,288.00 28,962.50

15,594.05

18 1 6.7

2

3

4

5

6

1 M² PLESTERAN CAM 1 Pc ; 8 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.150

Oh

85,000.00

Kepala Tukang

0.015

Oh

87,500.00

12,750.00 1,312.50

Pekerja/Buruh tak terampil

0.200

Oh

70,000.00

14,000.00

Mandor

0.010

Oh

90,000.00

900.00

3.456

Kg

1,428.00

0.029



344,000.00

BAHAN Semen abu-abu / PC Pasir Brantas (beton)

Jumlah 6.8

4,935.17 9,976.00 28,962.50

14,911.17

1 M² PLESTERAN CAM 1 Kp ; 1Sm ; 1 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.120

Oh

85,000.00

10,200.00

Kepala Tukang

0.012

Oh

87,500.00

1,050.00

Pekerja/Buruh tak terampil

0.220

Oh

70,000.00

15,400.00

Mandor

0.011

Oh

90,000.00

990.00

Kapur Pasang

0.009



806,600.00

7,259.40

Semen Merah

0.009



239,500.00

2,155.50

0.009



344,000.00

BAHAN

Pasir Brantas (beton)

Jumlah 6.9

3,096.00 27,640.00

12,510.90

1 M² PLESTERAN CAM 1 Kp ; 1Sm ; 2 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.120

Oh

85,000.00

10,200.00

Kepala Tukang

0.012

Oh

87,500.00

1,050.00

Pekerja/Buruh tak terampil

0.220

Oh

70,000.00

15,400.00

Mandor

0.011

Oh

90,000.00

990.00

Kapur Pasang

0.007



806,600.00

5,646.20

Semen Merah

0.007



239,500.00

1,676.50

0.015



344,000.00

BAHAN

Pasir Brantas (beton)

Jumlah 6.10

5,160.00 27,640.00

12,482.70

1 M² PLESTERAN CAM 1Pc ; 2 Kp ; 8 Psr ( TEBAL 1,5 CM) TENAGA Tukang

0.120

Oh

85,000.00

10,200.00

Kepala Tukang

0.012

Oh

87,500.00

1,050.00

Pekerja/Buruh tak terampil

0.220

Oh

70,000.00

15,400.00

Mandor

0.011

Oh

90,000.00

990.00

Semen abu-abu / PC

3.000

Kg

1,428.00

4,284.00

Kapur Pasang

0.005



806,600.00

4,033.00

0.020



344,000.00

BAHAN

Pasir Brantas (beton)

Jumlah 6.11

6,880.00 27,640.00

15,197.00

1 M² BERAPEN CAM 1Pc ; 5 Psr TENAGA Tukang

0.070

Oh

85,000.00

Kepala Tukang

0.007

Oh

87,500.00

5,950.00 612.50

Pekerja/Buruh tak terampil

0.150

Oh

70,000.00

10,500.00

Mandor

0.008

Oh

90,000.00

720.00

Semen abu-abu / PC

5.184

Kg

1,428.00

Pasir Brantas (beton)

0.026



344,000.00

BAHAN

Jumlah 6.12

7,402.75 8,944.00 17,782.50

1 M² PLESTERAN SIAR UNTUK DINDING BATA TENAGA Tukang

0.070

Oh

85,000.00

Kepala Tukang

0.007

Oh

87,500.00

5,950.00 612.50

Pekerja/Buruh tak terampil

0.150

Oh

70,000.00

10,500.00

16,346.75

19 1

2 Mandor

3

4

0.008

Oh

90,000.00

3.108

Kg

1,428.00

5

6 720.00

BAHAN Semen abu-abu / PC

Jumlah

4,438.22 17,782.50

4,438.22

20 1 6.13

2

3

4

5

6

1 M² PLESTERAN SIAR UNTUK PASANGAN BATU CAM 1PC : 2Psr TENAGA Tukang

0.140

Oh

85,000.00

Kepala Tukang

0.014

Oh

87,500.00

11,900.00 1,225.00

Pekerja/Buruh tak terampil

0.300

Oh

70,000.00

21,000.00

Mandor

0.015

Oh

90,000.00

1,350.00

6.340

Kg

1,428.00

0.012



344,000.00

BAHAN Semen abu-abu / PC Pasir Brantas (beton)

Jumlah 6.14

9,053.52 4,128.00 35,475.00

13,181.52

1 M² ACIAN BETON TENAGA Tukang

0.100

Oh

85,000.00

8,500.00

Kepala Tukang

0.010

Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.150

Oh

70,000.00

10,500.00

Mandor

0.008

Oh

90,000.00

720.00

3.250

Kg

1,428.00

BAHAN Semen abu-abu / PC

Jumlah

4,641.00 20,595.00

4,641.00

PEKERJAAN KAYU PEMBUATAN KOZEN PINTU - JENDELA PEK. PASANG PINTU DAN JENDELA 6.1

1 M³ PASANG KOZEN PINTU / JENDELA KAYU JATI TENAGA Tukang

18.000

Oh

85,000.00

1,530,000.00

Kepala Tukang

2.000

Oh

87,500.00

175,000.00

Pekerja/Buruh tak terampil

6.000

Oh

70,000.00

420,000.00

Mandor

0.300

Oh

90,000.00

27,000.00

Kayu jati 6/15

1.100



19,018,000.00

20,919,800.00

Paku 10 cm

1.250

kg

19,000.00

23,750.00

Lem Kayu

1.000

kg

14,700.00

BAHAN

Jumlah 6.2

14,700.00 2,152,000.00

20,958,250.00

1 M³ PASANG KOZEN PINTU / JENDELA KAYU KAMPER TENAGA Tukang

18.000

Oh

85,000.00

1,530,000.00

Kepala Tukang

2.000

Oh

87,500.00

175,000.00

Pekerja/Buruh tak terampil

6.000

Oh

70,000.00

420,000.00

Mandor

0.300

Oh

90,000.00

27,000.00

Kayu Kamper 6/15

1.200



15,093,000.00

18,111,600.00

Paku 10 cm

1.250

kg

19,000.00

23,750.00

Lem Kayu

1.000

kg

14,700.00

14,700.00

BAHAN

Jumlah 6.3

2,152,000.00

18,150,050.00

1 M³ PASANG KOZEN PINTU / JENDELA KAYU BALAU TENAGA Tukang

18.000

Oh

85,000.00

1,530,000.00

Kepala Tukang

2.000

Oh

87,500.00

175,000.00

Pekerja/Buruh tak terampil

6.000

Oh

70,000.00

420,000.00

Mandor

0.300

Oh

90,000.00

27,000.00

Kayu Balau 6/15

1.200



15,347,000.00

18,416,400.00

Paku 10 cm

1.250

kg

19,000.00

23,750.00

1.000

kg

14,700.00

BAHAN

Lem Kayu

Jumlah

14,700.00 2,152,000.00

18,454,850.00

21 1 6.4

2

3

4

5

6

1 M³ PASANG KOZEN PINTU / JENDELA KAYU TAHUN TENAGA Tukang

18.000

Oh

85,000.00

1,530,000.00

Kepala Tukang

2.000

Oh

87,500.00

175,000.00

Pekerja/Buruh tak terampil

6.000

Oh

70,000.00

420,000.00

Mandor

0.300

Oh

90,000.00

27,000.00

Kayu Tahun 6/15

1.200



7,094,000.00

8,512,800.00

Paku 10 cm

1.250

kg

19,000.00

23,750.00

Lem Kayu

1.000

kg

14,700.00

BAHAN

Jumlah 6.5

14,700.00 2,152,000.00

8,551,250.00

1 M² PASANG DAUN PINTU PANIL KAYU JATI TENAGA Tukang

2.500

Oh

85,000.00

212,500.00

Kepala Tukang

0.250

Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

0.040



19,687,000.00

0.500

kg

14,700.00

BAHAN Papan Kayu jati Lem Kayu

Jumlah 6.6

787,480.00 7,350.00 308,875.00

794,830.00

1 M² PASANG DAUN PINTU PANIL KAYU KAMPER TENAGA Tukang

2.500

Oh

85,000.00

212,500.00

Kepala Tukang

0.250

Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

Papan Kayu Kanper

0.040



15,395,000.00

615,800.00

Lem Kayu

0.500

kg

14,700.00

7,350.00

BAHAN

Jumlah 6.7

308,875.00

623,150.00

1 M² PASANG DAUN PINTU PANIL KAYU BALAU TENAGA Tukang

2.500

Oh

85,000.00

212,500.00

Kepala Tukang

0.250

Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

Papan Kayu Balau

0.040



16,301,000.00

652,040.00

Lem Kayu

0.500

kg

14,700.00

7,350.00

BAHAN

Jumlah 6.8

308,875.00

659,390.00

1 M² PASANG DAUN PINTU PANIL KAYU TAHUN TENAGA Tukang

2.500

Oh

85,000.00

212,500.00

Kepala Tukang

0.250

Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

Papan Kayu Tahun

0.040



7,245,000.00

289,800.00

Lem Kayu

0.500

kg

14,700.00

7,350.00

BAHAN

Jumlah

308,875.00

297,150.00

22 1 6.9

2

3

4

5

6

1 M² PASANG DAUN PINTU/JENDEL KACA KAYU JATI TENAGA Tukang

2.000

Oh

85,000.00

170,000.00

Kepala Tukang

0.200

Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800

Oh

70,000.00

56,000.00

Mandor

0.040

Oh

90,000.00

3,600.00

0.024



19,687,000.00

0.300

kg

14,700.00

BAHAN Papan Kayu jati Lem Kayu

Jumlah 6.10

472,488.00 4,410.00 247,100.00

476,898.00

1 M² PASANG DAUN PINTU /JENDEL KACA KAYU KAMPER TENAGA Tukang

2.000

Oh

85,000.00

170,000.00

Kepala Tukang

0.200

Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800

Oh

70,000.00

56,000.00

Mandor

0.040

Oh

90,000.00

3,600.00

Papan Kayu Kamper

0.024



15,395,000.00

369,480.00

Lem Kayu

0.300

kg

14,700.00

4,410.00

BAHAN

Jumlah 6.11

247,100.00

373,890.00

1 M² PASANG DAUN PINTU / JENDELA KACA KAYU BALAU TENAGA Tukang

2.000

Oh

85,000.00

170,000.00

Kepala Tukang

0.200

Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800

Oh

70,000.00

56,000.00

Mandor

0.040

Oh

90,000.00

3,600.00

Papan Kayu Balau

0.024



16,301,000.00

Lem Kayu

0.300

kg

14,700.00

BAHAN

Jumlah 6.13

391,224.00 4,410.00 247,100.00

395,634.00

1 M² PASANG DAUN PINTU /JENDELA KACA KAYU TAHUN TENAGA Tukang

2.000

Oh

85,000.00

170,000.00

Kepala Tukang

0.200

Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800

Oh

70,000.00

56,000.00

Mandor

0.040

Oh

90,000.00

3,600.00

Papan Kayu Tahun

0.024



7,245,000.00

Lem Kayu

0.300

kg

14,700.00

BAHAN

Jumlah 6.14

173,880.00 4,410.00 247,100.00

178,290.00

1 M² PASANG DAUN PINTU/JENDEL JALUSI KAYU JATI TENAGA Tukang

3.000

Oh

85,000.00

255,000.00

Kepala Tukang

0.300

Oh

87,500.00

26,250.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

Papan Kayu jati

0.064



19,687,000.00

Lem Kayu

0.500

kg

14,700.00

BAHAN

Jumlah 6.15

1,259,968.00 7,350.00 355,750.00

1,267,318.00

1 M² PASANG DAUN PINTU /JENDEL JALUSI KAYU KAMPER TENAGA Tukang

3.000

Oh

85,000.00

255,000.00

Kepala Tukang

0.300

Oh

87,500.00

26,250.00

Pekerja/Buruh tak terampil

1.000

Oh

70,000.00

70,000.00

Mandor

0.050

Oh

90,000.00

4,500.00

0.064



15,395,000.00

BAHAN Papan Kayu Kanper

985,280.00

23 1

2 Lem Kayu

3 0.500 Jumlah

4 kg

5

14,700.00

6 7,350.00

355,750.00

992,630.00

24 1 6.16

2

3

4

5

6

1 M² PASANG DAUN PINTU / JENDELA JALUSI KAYU BALAU TENAGA Tukang

3.000 Oh

85,000.00

255,000.00

Kepala Tukang

0.300 Oh

87,500.00

26,250.00

Pekerja/Buruh tak terampil

1.000 Oh

70,000.00

70,000.00

Mandor

0.050 Oh

90,000.00

4,500.00

BAHAN Papan Kayu Balau Lem Kayu

0.064



16,301,000.00

0.500

kg

14,700.00

Jumlah 6.17

1,043,264.00 7,350.00 355,750.00

1,050,614.00

1 M² PASANG DAUN PINTU /JENDELA JALUSI KAYU TAHUN TENAGA Tukang

3.000 Oh

85,000.00

255,000.00

Kepala Tukang

0.300 Oh

87,500.00

26,250.00

Pekerja/Buruh tak terampil

1.000 Oh

70,000.00

70,000.00

Mandor

0.050 Oh

90,000.00

4,500.00

BAHAN Papan Kayu Tahun

0.064



7,245,000.00

463,680.00

Lem Kayu

0.500

kg

14,700.00

7,350.00

Jumlah 6.18

355,750.00

471,030.00

1 M² PASANG JALUSI KUSEN KAYU JATI TENAGA Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.500 Oh

70,000.00

35,000.00

Mandor

0.025 Oh

90,000.00

2,250.00

BAHAN Papan Kayu jati

0.060



19,687,000.00

Paku`1cm - 2,5cm

0.150

Kg

19,000.00

Jumlah 6.19

1,181,220.00 2,850.00 224,750.00

1,184,070.00

1 M² PASANG JALUSI KUSEN KAYU KAMPER TENAGA Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.500 Oh

70,000.00

35,000.00

Mandor

0.025 Oh

90,000.00

2,250.00

BAHAN Papan Kayu Kanper

0.060



15,395,000.00

Paku`1cm - 2,5cm

0.150

Kg

19,000.00

Jumlah 6.20

923,700.00 2,850.00 224,750.00

926,550.00

1 M² PASANG JALUSI KUSEN KAYU BALAU TENAGA Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.500 Oh

70,000.00

35,000.00

Mandor

0.025 Oh

90,000.00

2,250.00

BAHAN Papan Kayu Balau

0.060



16,301,000.00

Paku`1cm - 2,5cm

0.150

Kg

19,000.00

Jumlah 6.21

978,060.00 2,850.00 224,750.00

980,910.00

1 M² PASANG JALUSI KUSEN KAYU TAHUN Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.500 Oh

70,000.00

35,000.00

Mandor

0.025 Oh

90,000.00

2,250.00

BAHAN Papan Kayu Tahun

0.060



7,245,000.00

434,700.00

Paku`1CM - 2,5CM

0.150

Kg

19,000.00

2,850.00

25 1

2

3 Jumlah

4

5 224,750.00

6 437,550.00

26 1 6.22

2

3

4

5

6

1 M² PASANG DAUN PINTU TEAKWOOD RANGKAP KAYU JATI TENAGA Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu jati

0.0250



19,687,000.00

Paku`

0.030

Kg

19,000.00

570.00

Lem Kayu

0.300

Kg

14,700.00

4,410.00

0.860

Lbr

134,400.00

Teakwood 4 mm (120x240)cm

Jumlah 6.23

492,175.00

115,584.00 247,100.00

612,739.00

1 M² PASANG DAUN PINTU TEAKWOOD RANGKAP KAYU KANPER TENAGA Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Kanper

0.0250



15,395,000.00

Paku`

0.030

Kg

19,000.00

570.00

Lem Kayu

0.300

Kg

14,700.00

4,410.00

0.860

Lbr

134,400.00

Teakwood 4 mm (120x240)cm

Jumlah 6.24

384,875.00

115,584.00 247,100.00

505,439.00

1 M² PASANG DAUN PINTU TEAKWOOD RANGKAP KAYU BALAU TENAGA Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Balau

0.0250



16,301,000.00

Paku`

0.030

Kg

19,000.00

570.00

Lem Kayu

0.300

Kg

14,700.00

4,410.00

Teakwood 4 mm (120x240)cm

0.860

Lbr

134,400.00

115,584.00

Jumlah 6.25

407,525.00

247,100.00

528,089.00

1 M² PASANG DAUN PINTU TEAKWOOD RANGKAP KAYU TAHUN TENAGA Tukang

2.000 Oh

85,000.00

170,000.00

Kepala Tukang

0.200 Oh

87,500.00

17,500.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Tahun

0.0250



7,245,000.00

Paku`

0.030

Kg

19,000.00

570.00

Lem Kayu

0.300

Kg

14,700.00

4,410.00

0.860

Lbr

134,400.00

Teakwood 4 mm (120x240)cm

Jumlah 6.26

181,125.00

115,584.00 247,100.00

301,689.00

1 M² PASANG DAUN PINTU TEAKWOOD + FORMIKA KAYU JATI Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu jati

0.0250



19,687,000.00

492,175.00

Paku`

0.030

Kg

19,000.00

570.00

Lem Kayu

0.800

Kg

14,700.00

11,760.00

Formika

0.500

Lbr

410,000.00

205,000.00

27 1

2 Teakwood 4 mm (120x240)cm

3 0.860 Jumlah

4 Lbr

5

134,400.00

6 115,584.00

293,975.00

825,089.00

28 1 6.27

2

3

4

5

6

1 M² PASANG DAUN PINTU TEAKWOOD + FORMIKA KAYU KANPER TENAGA Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Kanper

0.0250



15,395,000.00

Paku`

0.030

Kg

19,000.00

570.00

Lem Kayu

0.800

Kg

14,700.00

11,760.00

Formika

0.500

Lbr

410,000.00

205,000.00

Teakwood 4 mm (120x240)cm

0.860

Lbr

134,400.00

Jumlah 6.28

384,875.00

115,584.00 293,975.00

717,789.00

1 M² PASANG DAUN PINTU TEAKWOOD + FORMIKA KAYU BALAU TENAGA Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Balau

0.0250



16,301,000.00

Paku`

0.030

Kg

19,000.00

570.00

Lem Kayu

0.800

Kg

14,700.00

11,760.00

Formika

0.500

Lbr

410,000.00

205,000.00

0.860

Lbr

134,400.00

Teakwood 4 mm (120x240)cm

Jumlah 6.29

407,525.00

115,584.00 293,975.00

740,439.00

1 M² PASANG DAUN PINTU TEAKWOOD + FORMIKA KAYU TAHUN TENAGA Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Tahun

0.0250



7,245,000.00

181,125.00

Paku`

0.030

Kg

19,000.00

570.00

Lem Kayu

0.800

Kg

14,700.00

11,760.00

Formika

0.500

Lbr

410,000.00

205,000.00

0.860

Lbr

134,400.00

Teakwood 4 mm (120x240)cm

Jumlah 6.30

115,584.00 293,975.00

514,039.00

1 M² PAS. DAUN PINTU TEAKWOOD LAPIS ALUMINIUM RANGKAP RANGKA KAYU JATI TENAGA Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Jati

0.0250



19,687,000.00

Paku`

0.030

Kg

19,000.00

570.00

Lem Kayu

1.200

Kg

14,700.00

17,640.00

Teakwood 4 mm (120x240)cm

0.860

Lbr

134,400.00

115,584.00

0.500

Lbr

120,700.00

Teakwood Aluminium

Jumlah

492,175.00

60,350.00 293,975.00

686,319.00

29 1 6.31

2

3

4

5

6

1 M² PAS. DAUN PINTU TEAKWOOD LAPIS ALUMINIUM RANGKAP RANGKA KAYU KANPER TENAGA Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Kanper

0.0250



15,395,000.00

Paku`

0.030

Kg

19,000.00

570.00

Lem Kayu

1.200

Kg

14,700.00

17,640.00

Teakwood 4 mm (120x240)cm

0.860

Lbr

134,400.00

115,584.00

Teakwood Aluminium

0.500

Lbr

120,700.00

Jumlah 6.32

384,875.00

60,350.00 293,975.00

579,019.00

1 M² PAS. DAUN PINTU TEAKWOOD LAPIS ALUMINIUM RANGKAP RANGKA KAYU BALAU TENAGA Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Balau

0.0250



16,301,000.00

Paku`

0.030

Kg

19,000.00

570.00

Lem Kayu

1.200

Kg

14,700.00

17,640.00

Teakwood 4 mm (120x240)cm

0.860

Lbr

134,400.00

115,584.00

0.500

Lbr

120,700.00

Teakwood Aluminium

Jumlah 6.33

407,525.00

60,350.00 293,975.00

601,669.00

1 M² PAS. DAUN PINTU TEAKWOOD LAPIS ALUMINIUM RANGKAP RANGKA KAYU TAHUN TENAGA Tukang

2.500 Oh

85,000.00

212,500.00

Kepala Tukang

0.250 Oh

87,500.00

21,875.00

Pekerja/Buruh tak terampil

0.800 Oh

70,000.00

56,000.00

Mandor

0.040 Oh

90,000.00

3,600.00

BAHAN Papan Kayu Tahun

0.0250



7,245,000.00

181,125.00

Paku`

0.030

Kg

19,000.00

570.00

Lem Kayu

1.200

Kg

14,700.00

17,640.00

Teakwood 4 mm (120x240)cm

0.860

Lbr

134,400.00

115,584.00

0.500

Lbr

120,700.00

Teakwood Aluminium

Jumlah

60,350.00 293,975.00

375,269.00

PEKERJAAN KAYU PEMBUATAN RANGKA ATAP RANGKA ATAP BAJA RINGAN 6.01

1 M² PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP ASBES/SPANDEK TENAGA Tukang

0.650

85,000.00

Kepala Tukang

0.010

87,500.00

55,250.00 875.00

Pekerja/Buruh tak terampil

0.225

70,000.00

15,750.00

Mandor

0.100

90,000.00

9,000.00

C-75 , 0.8

1.488

22,300.00

33,182.40

C-75 , 0.6

2.232

19,900.00

44,416.80

28.000

600.00

16,800.00

Dynabolt

1.600

5,500.00

8,800.00

Reng

3.600

11,000.00

39,600.00

Talang jurai

0.124

30,100.00

BAHAN

Baut (screw driver)

Jumlah

3,732.40 80,875.00

146,531.60

30 1 6.02

2

3

4

5

6

1 M² PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL TENAGA Tukang

0.650

85,000.00

Kepala Tukang

0.010

87,500.00

55,250.00 875.00

Pekerja/Buruh tak terampil

0.225

70,000.00

15,750.00

Mandor

0.100

90,000.00

9,000.00

1.488

22,300.00

33,182.40

BAHAN C-75 , 0.8 C-75 , 0.6

2.232

19,900.00

44,416.80

38.000

600.00

22,800.00

Dynabolt

1.600

5,500.00

8,800.00

Reng

3.600

11,000.00

39,600.00

Talang jurai

0.124

30,100.00

3,732.40

Baut (screw driver)

Jumlah

80,875.00

152,531.60

PEKERJAAN KUDA - KUDA 6.1

1 M³ PAS. KONSTRUKSI KUDA-KUDA KAYU JATI TENAGA Tukang

12.000 Oh

85,000.00

1,020,000.00

Kepala Tukang

1.200 Oh

87,500.00

105,000.00

Pekerja/Buruh tak terampil

4.000 Oh

70,000.00

280,000.00

Mandor

0.200 Oh

90,000.00

18,000.00

BAHAN Kayu jati

1.100



19,018,000.00

20,919,800.00

Paku 12cm

5.600

Kg

19,000.00

106,400.00

15.000

Kg

20,800.00

Besi Plat Strip tebal 5mm

Jumlah 6.2

312,000.00 1,423,000.00

21,338,200.00

1 M³ PAS. KONSTRUKSI KUDA-KUDA KAYU BALAU TENAGA Tukang

12.000 Oh

85,000.00

1,020,000.00

Kepala Tukang

1.200 Oh

87,500.00

105,000.00

Pekerja/Buruh tak terampil

4.000 Oh

70,000.00

280,000.00

Mandor

0.200 Oh

90,000.00

18,000.00

BAHAN KayuBalau

1.100



15,347,000.00

16,881,700.00

Paku 12cm

5.600

Kg

19,000.00

106,400.00

15.000

Kg

20,800.00

Besi Plat Strip tebal 5mm

Jumlah 6.3

312,000.00 1,423,000.00

17,300,100.00

1 M³ PAS. KONSTRUKSI KUDA-KUDA KAYU KRUING TENAGA Tukang

12.000 Oh

85,000.00

1,020,000.00

Kepala Tukang

1.200 Oh

87,500.00

105,000.00

Pekerja/Buruh tak terampil

4.000 Oh

70,000.00

280,000.00

Mandor

0.200 Oh

90,000.00

18,000.00

BAHAN Kayu Kruing

1.100



10,263,000.00

11,289,300.00

Paku 12cm

5.600

Kg

19,000.00

106,400.00

15.000

Kg

20,800.00

Besi Plat Strip tebal 5mm

Jumlah 6.4

312,000.00 1,423,000.00

11,707,700.00

1 M³ PAS. KONSTRUKSI KUDA-KUDA KAYU MERANTI TENAGA Tukang

12.000 Oh

85,000.00

1,020,000.00

Kepala Tukang

1.200 Oh

87,500.00

105,000.00

Pekerja/Buruh tak terampil

4.000 Oh

70,000.00

280,000.00

Mandor

0.200 Oh

90,000.00

18,000.00

BAHAN Kayu Meranti

1.100



8,603,000.00

9,463,300.00

Paku 12cm

5.600

Kg

19,000.00

106,400.00

31 1

2 Besi Plat Strip tebal 5mm

3 15.000 Jumlah

4 Kg

5

20,800.00

6 312,000.00

1,423,000.00

9,881,700.00

32 1 6.5

2

3

4

5

6

1 M³ PAS. KONSTRUKSI KUDA-KUDA KAYU TAHUN TENAGA Tukang

12.000 Oh

85,000.00

1,020,000.00

Kepala Tukang

1.200 Oh

87,500.00

105,000.00

Pekerja/Buruh tak terampil

4.000 Oh

70,000.00

280,000.00

Mandor

0.200 Oh

90,000.00

18,000.00

BAHAN Kayu Tahun Paku 12cm Besi Plat Strip tebal 5mm

1.100



7,094,000.00

7,803,400.00

5.600

Kg

19,000.00

106,400.00

15.000

Kg

20,800.00

Jumlah 6.6

312,000.00 1,423,000.00

8,221,800.00

1 M³ ONGKOS PAS. KONSTRUKSI KUDA-KUDA LAMA TENAGA Tukang

12.000 Oh

85,000.00

1,020,000.00

Kepala Tukang

1.200 Oh

87,500.00

105,000.00

Pekerja/Buruh tak terampil

4.000 Oh

70,000.00

280,000.00

Mandor

0.200 Oh

90,000.00

18,000.00

Jumlah

1,423,000.00

PEKERJAAN GORDING 6.7

1 M³ PAS. KONSTRUKSI GORDING KAYU JATI TENAGA Tukang

7.200 Oh

85,000.00

Kepala Tukang

0.720 Oh

87,500.00

612,000.00 63,000.00

Pekerja/Buruh tak terampil

2.400 Oh

70,000.00

168,000.00

Mandor

0.120 Oh

90,000.00

10,800.00

BAHAN Kayu jati

1.100



19,018,000.00

Paku 12cm

3.000

Kg

19,000.00

57,000.00

15.000

Kg

20,800.00

312,000.00

Besi Plat Strip tebal 5mm

Jumlah 6.8

20,919,800.00

853,800.00

21,288,800.00

1 M³ PAS. KONSTRUKSI GORDING KAYU BALAU TENAGA Tukang

7.200 Oh

85,000.00

Kepala Tukang

0.720 Oh

87,500.00

612,000.00 63,000.00

Pekerja/Buruh tak terampil

2.400 Oh

70,000.00

168,000.00

Mandor

0.120 Oh

90,000.00

10,800.00

BAHAN KayuBalau

1.100



15,347,000.00

Paku 12cm

3.000

Kg

19,000.00

57,000.00

15.000

Kg

20,800.00

312,000.00

Besi Plat Strip tebal 5mm

Jumlah 6.9

16,881,700.00

853,800.00

17,250,700.00

1 M³ PAS. KONSTRUKSI GORDING KAYU KRUING TENAGA Tukang

7.200 Oh

85,000.00

Kepala Tukang

0.720 Oh

87,500.00

612,000.00 63,000.00

Pekerja/Buruh tak terampil

2.400 Oh

70,000.00

168,000.00

Mandor

0.120 Oh

90,000.00

10,800.00

BAHAN Kayu Kruing

1.100



10,263,000.00

Paku 12cm

3.000

Kg

19,000.00

57,000.00

15.000

Kg

20,800.00

312,000.00

Besi Plat Strip tebal 5mm

Jumlah

11,289,300.00

853,800.00

11,658,300.00

33 1 6.10

2

3

4

5

6

1 M³ PAS. KONSTRUKSI GORDING KAYU MERANTI TENAGA Tukang

7.200 Oh

85,000.00

Kepala Tukang

0.720 Oh

87,500.00

612,000.00 63,000.00

Pekerja/Buruh tak terampil

2.400 Oh

70,000.00

168,000.00

Mandor

0.120 Oh

90,000.00

10,800.00

BAHAN Kayu Meranti Paku 12cm Besi Plat Strip tebal 5mm

1.100



8,603,000.00

3.000

Kg

19,000.00

57,000.00

15.000

Kg

20,800.00

312,000.00

Jumlah 6.11

9,463,300.00

853,800.00

9,832,300.00

1 M³ PAS. KONSTRUKSI GORDING KAYU TAHUN TENAGA Tukang

7.200 Oh

85,000.00

Kepala Tukang

0.720 Oh

87,500.00

612,000.00 63,000.00

Pekerja/Buruh tak terampil

2.400 Oh

70,000.00

168,000.00

Mandor

0.120 Oh

90,000.00

10,800.00

BAHAN Kayu Tahun

1.100



7,094,000.00

Paku 12cm

3.000

Kg

19,000.00

57,000.00

15.000

Kg

20,800.00

312,000.00

Besi Plat Strip tebal 5mm

Jumlah 6.12

7,803,400.00

853,800.00

8,172,400.00

1 M³ ONGKOS PAS. KONSTRUKSI GORDING LAMA TENAGA Tukang

7.200 Oh

85,000.00

Kepala Tukang

0.720 Oh

87,500.00

612,000.00 63,000.00

Pekerja/Buruh tak terampil

2.400 Oh

70,000.00

168,000.00

Mandor

0.120 Oh

90,000.00

10,800.00

3.000

19,000.00

BAHAN Paku 12cm

Kg

Jumlah

57,000.00 853,800.00

57,000.00

PEKERJAAN KASO + RENG 6.13

1 M² PAS. KASO + RENG KAYU ( JATI - JATI) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Jati

0.010



19,018,000.00

190,180.00

Reng Kayu Jati Paku 5 - 10cm

0.003



19,018,000.00

57,054.00

0.150

Kg

19,000.00

Jumlah 6.14

2,850.00 16,825.00

250,084.00

1 M² PAS. KASO + RENG KAYU (BALAU - BALAU) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Balau

0.010



15,347,000.00

153,470.00

Reng Kayu Balau Paku 5 - 10cm

0.003



15,347,000.00

46,041.00

0.150

Kg

19,000.00

Jumlah

2,850.00 16,825.00

202,361.00

34 1 6.15

2

3

4

5

6

1 M² PAS. KASO + RENG KAYU ( BALAUI - JATI) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Balau

0.010



15,347,000.00

153,470.00

Reng Kayu Jati Paku 5 - 10cm

0.003



19,018,000.00

57,054.00

0.150

Kg

19,000.00

Jumlah 6.16

2,850.00 16,825.00

213,374.00

1 M² PAS. KASO + RENG KAYU ( KRUING - JATI) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Kruing

0.010



10,263,000.00

102,630.00

Reng Kayu Jati

0.003



19,018,000.00

57,054.00

Paku 5 - 10cm

0.150

Kg

19,000.00

Jumlah 6.17

2,850.00 16,825.00

162,534.00

1 M² PAS. KASO + RENG KAYU ( KRUING - BALAU ) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Kruing

0.010



10,263,000.00

102,630.00

Reng Kayu Balau

0.003



15,347,000.00

46,041.00

Paku 5 - 10cm

0.150

Kg

19,000.00

Jumlah 6.18

2,850.00 16,825.00

151,521.00

1 M² PAS. KASO + RENG KAYU ( KRUING - TAHUN ) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Kruing

0.010



10,263,000.00

102,630.00

Reng Kayu Tahun

0.003



7,094,000.00

21,282.00

Paku 5 - 10cm

0.150

Kg

19,000.00

Jumlah 6.19

2,850.00 16,825.00

126,762.00

1 M² PAS. KASO + RENG KAYU ( MERANTI - JATI) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Meranti

0.010



8,603,000.00

86,030.00

Reng Kayu Jati

0.003



19,018,000.00

57,054.00

Paku 5 - 10cm

0.150

Kg

19,000.00

Jumlah

2,850.00 16,825.00

145,934.00

35 1 6.20

2

3

4

5

6

1 M² PAS. KASO + RENG KAYU ( TAHUN - JATI) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Tahun

0.010



7,094,000.00

70,940.00

Reng Kayu Jati Paku 5 - 10cm

0.003



19,018,000.00

57,054.00

0.150

Kg

19,000.00

Jumlah 6.21

2,850.00 16,825.00

130,844.00

1 M² PAS. KASO + RENG KAYU ( TAHUN - TAHUN) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Tahun

0.010



7,094,000.00

70,940.00

Reng Kayu Tahun Paku 5 - 10cm

0.003



7,094,000.00

21,282.00

0.150

Kg

19,000.00

Jumlah 6.22

2,850.00 16,825.00

95,072.00

1 M² PAS. KASO LAMA + RENG BARU KAYU JATI TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Reng Kayu Jati Paku 5 - 10cm

0.003



19,018,000.00

0.150

Kg

19,000.00

Jumlah 6.23

57,054.00 2,850.00 16,825.00

59,904.00

1 M² PAS. KASO LAMA + RENG BARU KAYU BALAU TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Reng Kayu Balau

0.003



15,347,000.00

46,041.00

Paku 5 - 10cm

0.150

Kg

19,000.00

2,850.00

Jumlah 6.24

16,825.00

48,891.00

1 M² PAS. KASO LAMA + RENG BARU KAYU TAHUN TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Reng Kayu Tahun

0.003



7,094,000.00

Paku 5 - 10cm

0.150

Kg

19,000.00

Jumlah

21,282.00 2,850.00 16,825.00

24,132.00

36 1 6.25

2

3

4

5

6

1 M² PAS. KASO + RENG ATAP SIRAP KAYU ( JATI - JATI) TENAGA Tukang

0.120 Oh

85,000.00

10,200.00

Kepala Tukang

0.012 Oh

87,500.00

1,050.00

Pekerja/Buruh tak terampil

0.120 Oh

70,000.00

8,400.00

Mandor

0.006 Oh

90,000.00

540.00

BAHAN Kaso Kayu JATI

0.007



19,018,000.00

133,126.00

Reng Kayu JATI Paku 5 - 10cm

0.006



19,018,000.00

114,108.00

0.150

Kg

19,000.00

Jumlah 6.26

2,850.00 20,190.00

250,084.00

1 M² PAS. KASO + RENG ATAP SIRAP KAYU ( BALAU - JATI) TENAGA Tukang

0.120 Oh

85,000.00

10,200.00

Kepala Tukang

0.012 Oh

87,500.00

1,050.00

Pekerja/Buruh tak terampil

0.120 Oh

70,000.00

8,400.00

Mandor

0.006 Oh

90,000.00

540.00

BAHAN Kaso Kayu BALAU

0.007



15,347,000.00

107,429.00

Reng Kayu JATI Paku 5 - 10cm

0.006



19,018,000.00

114,108.00

0.150

Kg

19,000.00

Jumlah 6.27

2,850.00 20,190.00

224,387.00

1 M² PAS. KASO + RENG ATAP SIRAP KAYU ( KAMPER - JATI) TENAGA Tukang

0.120 Oh

85,000.00

10,200.00

Kepala Tukang

0.012 Oh

87,500.00

1,050.00

Pekerja/Buruh tak terampil

0.120 Oh

70,000.00

8,400.00

Mandor

0.006 Oh

90,000.00

540.00

BAHAN Kaso Kayu KAMPER

0.007



15,093,000.00

105,651.00

Reng Kayu JATI

0.006



19,018,000.00

114,108.00

Paku 5 - 10cm

0.150

Kg

19,000.00

Jumlah 6.28

2,850.00 20,190.00

222,609.00

1 M² PAS. KASO + RENG ATAP SIRAP KAYU ( KRUING - JATI) TENAGA Tukang

0.120 Oh

85,000.00

10,200.00

Kepala Tukang

0.012 Oh

87,500.00

1,050.00

Pekerja/Buruh tak terampil

0.120 Oh

70,000.00

8,400.00

Mandor

0.006 Oh

90,000.00

540.00

BAHAN Kaso Kayu KRUING

0.007



10,263,000.00

71,841.00

Reng Kayu JATI

0.006



19,018,000.00

114,108.00

0.150

Kg

19,000.00

Paku 5 - 10cm

Jumlah 6.29

2,850.00 20,190.00

188,799.00

1 M² PAS. KASO + RENG ATAP SIRAP KAYU ( MERANTI - JATI) TENAGA Tukang

0.120 Oh

85,000.00

10,200.00

Kepala Tukang

0.012 Oh

87,500.00

1,050.00

Pekerja/Buruh tak terampil

0.120 Oh

70,000.00

8,400.00

Mandor

0.006 Oh

90,000.00

540.00

BAHAN Kaso Kayu MERANTI

0.007



8,603,000.00

60,221.00

Reng Kayu JATI

0.006



19,018,000.00

114,108.00

0.150

Kg

19,000.00

Paku 5 - 10cm

Jumlah

2,850.00 20,190.00

177,179.00

37 1 6.30

2

3

4

5

6

1 M² PAS. KASO + RENG ATAP GNT BETON KAYU ( BALAU - JATI) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu BALAU

0.010



15,347,000.00

153,470.00

Reng Kayu JATI Paku 5 - 10cm

0.006



19,018,000.00

114,108.00

0.150

Kg

19,000.00

Jumlah 6.31

2,850.00 16,825.00

270,428.00

1 M² PAS. KASO + RENG ATAP GNT BETON KAYU ( KRUING - JATI) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu KRUING

0.010



10,263,000.00

102,630.00

Reng Kayu JATI Paku 5 - 10cm

0.006



19,018,000.00

114,108.00

0.150

Kg

19,000.00

Jumlah 6.32

2,850.00 16,825.00

219,588.00

1 M² PAS. KASO + RENG ATAP GNT BETON KAYU ( MERANTI - JATI) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu MERANTI

0.010



8,603,000.00

86,030.00

Reng Kayu JATI Paku 5 - 10cm

0.006



19,018,000.00

114,108.00

0.150

Kg

19,000.00

Jumlah 6.33

2,850.00 16,825.00

202,988.00

1 M² PAS. KASO + RENG ATAP GNT BETON KAYU ( TAHUN - JATI) TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Kaso Kayu Tahun

0.010



7,094,000.00

70,940.00

Reng Kayu Jati Paku 5 - 10cm

0.006



19,018,000.00

114,108.00

0.150

Kg

19,000.00

Jumlah

2,850.00 16,825.00

187,898.00

PEKERJAAN RANGKA LANGIT - LANGIT 6.34

1 M² PAS. RANGKA LANGIT - LANGIT ( 50X100 )KAYU JATI TENAGA Tukang

0.250 Oh

85,000.00

Kepala Tukang

0.025 Oh

87,500.00

21,250.00 2,187.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.075 Oh

90,000.00

6,750.00

BAHAN Kaso Kayu Jati Paku

0.0154



19,018,000.00

0.200

Kg

19,000.00

Jumlah

292,877.20 3,800.00 40,687.50

296,677.20

38 1 6.35

2

3

4

5

6

1 M² PAS. RANGKA LANGIT - LANGIT ( 50X100 )KAYU KANPER TENAGA Tukang

0.250 Oh

85,000.00

Kepala Tukang

0.025 Oh

87,500.00

21,250.00 2,187.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.075 Oh

90,000.00

6,750.00

BAHAN Kaso Kayu Kamper Paku

0.0154



15,093,000.00

0.200

Kg

19,000.00

Jumlah 6.36

232,432.20 3,800.00 40,687.50

236,232.20

1 M² PAS. RANGKA LANGIT - LANGIT ( 50X100 ) KAYU KRUING TENAGA Tukang

0.250 Oh

85,000.00

21,250.00

Kepala Tukang

0.025 Oh

87,500.00

2,187.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.075 Oh

90,000.00

6,750.00

BAHAN Kaso Kayu Kruing Paku

0.0154



10,263,000.00

158,050.20

0.200

Kg

19,000.00

3,800.00

Jumlah 6.37

40,687.50

161,850.20

1 M² PAS. RANGKA LANGIT - LANGIT ( 50X100 ) KAYU MERANTI TENAGA Tukang

0.250 Oh

85,000.00

21,250.00

Kepala Tukang

0.025 Oh

87,500.00

2,187.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.075 Oh

90,000.00

6,750.00

BAHAN Kaso Kayu Meranti Paku

0.0154



8,603,000.00

0.200

Kg

19,000.00

Jumlah 6.38

132,486.20 3,800.00 40,687.50

136,286.20

1 M² PAS. RANGKA LANGIT - LANGIT ( 50X100 ) KAYU TAHUN TENAGA Tukang

0.250 Oh

85,000.00

Kepala Tukang

0.025 Oh

87,500.00

21,250.00 2,187.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.075 Oh

90,000.00

6,750.00

BAHAN Kaso Kayu Tahun Paku

0.0154



7,094,000.00

0.200

Kg

19,000.00

Jumlah 6.39

109,247.60 3,800.00 40,687.50

113,047.60

1 M² ONGKOS PAS. RANGKA LANGIT - LANGIT ( 50X100 ) KAYU LAMA TENAGA Tukang

0.250 Oh

85,000.00

Kepala Tukang

0.025 Oh

87,500.00

21,250.00 2,187.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.075 Oh

90,000.00

6,750.00

0.200

19,000.00

BAHAN Paku

Kg

Jumlah 6.40

3,800.00 40,687.50

3,800.00

1 M² PAS. RANGKA LANGIT - LANGIT ( 60 x 60 )KAYU JATI TENAGA Tukang

0.300 Oh

85,000.00

25,500.00

Kepala Tukang

0.030 Oh

87,500.00

2,625.00

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

BAHAN Kaso Kayu Jati Paku

0.0163



19,018,000.00

0.250

Kg

19,000.00

Jumlah

309,993.40 4,750.00 43,025.00

314,743.40

39 1 6.41

2

3

4

5

6

1 M² PAS. RANGKA LANGIT - LANGIT ( 60 x 60 )KAYU KANPER TENAGA Tukang

0.300 Oh

85,000.00

Kepala Tukang

0.030 Oh

87,500.00

25,500.00 2,625.00

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

BAHAN Kaso Kayu Kamper Paku

0.0163



15,093,000.00

0.250

Kg

19,000.00

Jumlah 6.42

246,015.90 4,750.00 43,025.00

250,765.90

1 M² PAS. RANGKA LANGIT - LANGIT ( 60 x 60 ) KAYU KRUING TENAGA Tukang

0.300 Oh

85,000.00

25,500.00

Kepala Tukang

0.030 Oh

87,500.00

2,625.00

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

BAHAN Kaso Kayu Kruing Paku

0.0163



10,263,000.00

167,286.90

0.250

Kg

19,000.00

4,750.00

Jumlah 6.43

43,025.00

172,036.90

1 M² PAS. RANGKA LANGIT - LANGIT ( 60 x 60 ) KAYU MERANTI TENAGA Tukang

0.300 Oh

85,000.00

25,500.00

Kepala Tukang

0.030 Oh

87,500.00

2,625.00

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

BAHAN Kaso Kayu Meranti Paku

0.0163



8,603,000.00

0.250

Kg

19,000.00

Jumlah 6.44

140,228.90 4,750.00 43,025.00

144,978.90

1 M² PAS. RANGKA LANGIT - LANGIT ( 60 x 60 ) KAYU TAHUN TENAGA Tukang

0.300 Oh

85,000.00

Kepala Tukang

0.030 Oh

87,500.00

25,500.00 2,625.00

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

BAHAN Kaso Kayu Tahun Paku

0.0163



7,094,000.00

0.250

Kg

19,000.00

Jumlah 6.45

115,632.20 4,750.00 43,025.00

120,382.20

1 M² ONGKOS PAS. RANGKA LANGIT - LANGIT ( 60 x 60 ) KAYU LAMA TENAGA Tukang

0.300 Oh

85,000.00

25,500.00

Kepala Tukang

0.030 Oh

87,500.00

2,625.00

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

0.250

19,000.00

BAHAN Paku

Kg

Jumlah

4,750.00 43,025.00

4,750.00

PEKERJAAN LISPLANK 6.46

1 M' PAS. LISPLANK ( 3 X 20 ) KAYU JATI TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu jati

0.0072



19,687,000.00

141,746.40

40 1

2 Paku`

3 0.050 Jumlah

4 Kg

5

19,000.00

6 950.00

26,200.00

142,696.40

41 1 6.47

2

3

4

5

6

1 M' PAS. LISPLANK ( 3 X 20 ) KAYU KANPER TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Kanper

0.0072



15,395,000.00

0.050

Kg

19,000.00

Paku`

Jumlah 6.48

110,844.00 950.00 26,200.00

111,794.00

1 M' PAS. LISPLANK ( 3 X 20 ) KAYU BALAU TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Balau

0.0072



16,301,000.00

117,367.20

0.050

Kg

19,000.00

950.00

Paku`

Jumlah 6.49

26,200.00

118,317.20

1 M' PAS. LISPLANK ( 3 X 20 ) KAYU KRUING TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Kruing

0.0072



11,169,000.00

0.050

Kg

19,000.00

Paku`

Jumlah 6.50

80,416.80 950.00 26,200.00

81,366.80

1 M' PAS. LISPLANK ( 3 X 20 ) KAYU TAHUN TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Tahun Paku`

0.0072



7,245,000.00

0.050

Kg

19,000.00

Jumlah 6.51

52,164.00 950.00 26,200.00

53,114.00

1 M' ONGKOS PAS. LISPLANK ( 3 X 20 ) KAYU LAMA TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

0.050

19,000.00

BAHAN Paku`

Kg

Jumlah 6.52

950.00 26,200.00

950.00

1 M' PAS. LISPLANK ( 3 X 30 ) KAYU JATI TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu jati Paku`

0.011



19,687,000.00

0.050

Kg

19,000.00

Jumlah

216,557.00 950.00 26,200.00

217,507.00

42 1 6.53

2

3

4

5

6

1 M' PAS. LISPLANK ( 3 X 30 ) KAYU KANPER TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Kanper Paku`

0.011



15,395,000.00

0.050

Kg

19,000.00

Jumlah 6.54

169,345.00 950.00 26,200.00

170,295.00

1 M' PAS. LISPLANK ( 3 X 30 ) KAYU BALAU TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Balau

0.011



16,301,000.00

179,311.00

Paku`

0.050

Kg

19,000.00

950.00

Jumlah 6.55

26,200.00

180,261.00

1 M' PAS. LISPLANK ( 3 X 30 ) KAYU KRUING TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Kruing Paku`

0.011



11,169,000.00

0.050

Kg

19,000.00

Jumlah 6.56

122,859.00 950.00 26,200.00

123,809.00

1 M' PAS. LISPLANK ( 3 X 30 ) KAYU TAHUN TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

BAHAN Papan Kayu Tahun

0.011



7,245,000.00

79,695.00

Paku`

0.050

Kg

19,000.00

950.00

Jumlah 6.57

26,200.00

80,645.00

1 M' ONGKOS PAS. LISPLANK ( 3 X 30 ) KAYU LAMA TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

450.00

0.050

19,000.00

BAHAN Paku`

Kg

Jumlah 6.58

950.00 26,200.00

950.00

1 M' PAS. LISPLANK ( 2 X 2 X 20 ) KAYU JATI TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.050 Oh

90,000.00

4,500.00

BAHAN Papan Kayu jati

0.0086



19,687,000.00

169,308.20

Paku`

0.0600

Kg

19,000.00

1,140.00

43 1

2

3 Jumlah

4

5 20,875.00

6 170,448.20

44 1 6.59

2

3

4

5

6

1 M' PAS. LISPLANK ( 2 X 2 X 20 ) KAYU KANPER TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.050 Oh

90,000.00

4,500.00

BAHAN Papan Kayu Kanper Paku`

0.0086



15,395,000.00

0.0600

Kg

19,000.00

Jumlah 6.60

132,397.00 1,140.00 20,875.00

133,537.00

1 M' PAS. LISPLANK ( 2 X 2 X 20 ) KAYU BALAU TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.050 Oh

90,000.00

4,500.00

BAHAN Papan Kayu Balau

0.0086



16,301,000.00

140,188.60

Paku`

0.0600

Kg

19,000.00

1,140.00

Jumlah 6.61

20,875.00

141,328.60

1 M' PAS. LISPLANK ( 2 X 2 X 20 ) KAYU KRUING TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.050 Oh

90,000.00

4,500.00

BAHAN Papan Kayu Kruing

0.0086



11,169,000.00

Paku`

0.0600

Kg

19,000.00

Jumlah 6.62

96,053.40 1,140.00 20,875.00

97,193.40

1 M' PAS. LISPLANK ( 2 X 2 X 20 ) KAYU TAHUN TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.050 Oh

90,000.00

4,500.00

BAHAN Papan Kayu Tahun

0.0086



7,245,000.00

Paku`

0.0600

Kg

19,000.00

Jumlah 6.63

62,307.00 1,140.00 20,875.00

63,447.00

1 M2 PAS. RANGKA DINDING PEMISAH ( 60x120 ) KAYU JATI TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Kaso Kayu Jati

0.0280



19,018,000.00

Paku`

0.1500

Kg

19,000.00

Jumlah 6.64

532,504.00 2,850.00 53,407.50

535,354.00

1 M2 PAS. RANGKA DINDING PEMISAH ( 60x120 ) KAYU KAMPER TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Kaso Kayu Kamper

0.0280



15,093,000.00

422,604.00

Paku`

0.1500

Kg

19,000.00

2,850.00

45 1

2

3 Jumlah

4

5 53,407.50

6 425,454.00

46 1 6.65

2

3

4

5

6

1 M2 PAS. RANGKA DINDING PEMISAH ( 60x120 ) KAYU KRUING TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Kaso Kayu Kruing Paku`

0.0280



10,263,000.00

0.1500

Kg

19,000.00

Jumlah 6.66

287,364.00 2,850.00 53,407.50

290,214.00

1 M2 PAS. RANGKA DINDING PEMISAH ( 60x120 ) KAYU MERANTI TENAGA Tukang

0.450 Oh

85,000.00

38,250.00

Kepala Tukang

0.045 Oh

87,500.00

3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Kaso Kayu Meranti

0.0280



8,603,000.00

240,884.00

Paku`

0.1500

Kg

19,000.00

2,850.00

Jumlah 6.67

53,407.50

243,734.00

1 M2 PAS. RANGKA DINDING PEMISAH ( 60x120 ) KAYU TAHUN TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Kaso Kayu Tahun Paku`

0.0280



7,094,000.00

0.1500

Kg

19,000.00

Jumlah 6.68

198,632.00 2,850.00 53,407.50

201,482.00

1 M2 PAS. RANGKA DINDING PEMISAH TEAKWOOD RANGKAP KAYU JATI TENAGA Tukang

0.450 Oh

85,000.00

38,250.00

Kepala Tukang

0.045 Oh

87,500.00

3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Balok Kayu Jati 6/12

0.0280



19,018,000.00

532,504.00

Lem Kayu

0.5600

kg

14,700.00

8,232.00

Teakwood 4 mm (120x240)cm

0.8600

Lbr

134,400.00

115,584.00

Paku`

0.1500

Kg

19,000.00

Jumlah 6.69

2,850.00 53,407.50

659,170.00

1 M2 PAS. RANGKA DINDING PEMISAH TEAKWOOD RANGKAP KAYU KAMPER TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Balok Kayu Kamper 6/12

0.0280

Lem Kayu

0.5600

kg

14,700.00

8,232.00

Teakwood 4 mm (120x240)cm

0.8600

Lbr

134,400.00

115,584.00

0.1500

Kg

19,000.00

Paku`

Jumlah



15,093,000.00

422,604.00

2,850.00 53,407.50

549,270.00

47 1 6.70

2

3

4

5

6

1 M2 PAS. RANGKA DINDING PEMISAH TEAKWOOD RANGKAP KAYU KRUING TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Balok Kayu Kruing 6/12

0.0280

Lem Kayu

0.5600

kg

14,700.00

8,232.00

Teakwood 4 mm (120x240)cm

0.8600

Lbr

134,400.00

115,584.00

0.1500

Kg

19,000.00

Paku`



10,263,000.00

Jumlah 6.71

287,364.00

2,850.00 53,407.50

414,030.00

1 M2 PAS. RANGKA DINDING PEMISAH TEAKWOOD RANGKAP KAYU MERANTI TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Balok Kayu Meranti 6/12

0.0280



8,603,000.00

Lem Kayu

0.5600

kg

14,700.00

8,232.00

Teakwood 4 mm (120x240)cm

0.8600

Lbr

134,400.00

115,584.00

Paku`

0.1500

Kg

19,000.00

2,850.00

Jumlah 6.72

240,884.00

53,407.50

367,550.00

1 M2 PAS. RANGKA DINDING PEMISAH TEAKWOOD RANGKAP KAYU TAHUN TENAGA Tukang

0.450 Oh

85,000.00

38,250.00

Kepala Tukang

0.045 Oh

87,500.00

3,937.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Balok Kayu Tahun 6/12

0.0280



7,094,000.00

198,632.00

Lem Kayu

0.5600

kg

14,700.00

8,232.00

Teakwood 4 mm (120x240)cm

0.8600

Lbr

134,400.00

115,584.00

Paku`

0.1500

Kg

19,000.00

Jumlah 6.73

2,850.00 53,407.50

325,298.00

1 M' PAS. LIST ETERNIT TENAGA Tukang

0.050 Oh

85,000.00

4,250.00

Kepala Tukang

0.005 Oh

87,500.00

437.50

Pekerja/Buruh tak terampil

0.050 Oh

70,000.00

3,500.00

Mandor

0.003 Oh

90,000.00

270.00

BAHAN List Eternit Paku

1.050

M'

4,800.00

0.010

kg

19,000.00

Jumlah 6.74

5,040.00 190.00 8,457.50

5,230.00

1 M' PAS. LIST PLAFOND KAYU PROFIL TENAGA Tukang

0.050 Oh

85,000.00

4,250.00

Kepala Tukang

0.005 Oh

87,500.00

437.50

Pekerja/Buruh tak terampil

0.050 Oh

70,000.00

3,500.00

Mandor

0.003 Oh

90,000.00

270.00

BAHAN Kayu List Profil

1.050

M'

9,600.00

10,080.00

Paku

0.010

kg

19,000.00

190.00

Jumlah

8,457.50

10,270.00

48 1 6.75

2

3

4

5

6

1 M' PAS. LIST PLAFOND GYBSUM KECIL TENAGA Tukang

0.050 Oh

85,000.00

Kepala Tukang

0.005 Oh

87,500.00

4,250.00 437.50

Pekerja/Buruh tak terampil

0.050 Oh

70,000.00

3,500.00

Mandor

0.003 Oh

90,000.00

270.00

1.050

M'

10,800.00

0.010

kg

19,000.00

BAHAN List Gypsum Kecil Paku

Jumlah 6.76

11,340.00 190.00 8,457.50

11,530.00

1 M' PAS. LIST PLAFOND GYBSUM BESAR TENAGA Tukang

0.050 Oh

85,000.00

4,250.00

Kepala Tukang

0.005 Oh

87,500.00

437.50

Pekerja/Buruh tak terampil

0.050 Oh

70,000.00

3,500.00

Mandor

0.003 Oh

90,000.00

270.00

List Gypsum Besar

1.050

M'

15,000.00

15,750.00

Paku

0.010

kg

19,000.00

190.00

BAHAN

Jumlah

8,457.50

15,940.00

PEKERJAAN BETONAN 6.4

1 M³ MEMBUAT LANTAI KERJA BETON MUTU K 100 TENAGA Tukang

0.200 Oh

85,000.00

Kepala Tukang

0.020 Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

1.200 Oh

70,000.00

84,000.00

Mandor

0.006 Oh

90,000.00

540.00

BAHAN Semen abu-abu / PC

230.00

Kg

1,428.00

328,440.00

Pasir Brantas (beton)

0.640



344,000.00

220,160.00

Koral Beton Split 1 - 2 cm

0.760



343,900.00

261,364.00

Jumlah 6.5

103,290.00

809,964.00

1 M³ MEMBUAT BETON MUTU K 175 TENAGA Tukang

0.250 Oh

85,000.00

Kepala Tukang

0.025 Oh

87,500.00

21,250.00 2,187.50

Pekerja/Buruh tak terampil

1.650 Oh

70,000.00

115,500.00

Mandor

0.080 Oh

90,000.00

7,200.00

BAHAN Semen abu-abu / PC

326.00

Kg

1,428.00

465,528.00

Pasir Brantas (beton)

0.540



344,000.00

185,760.00

Koral Beton Split 1 - 2 cm

0.760



343,900.00

261,364.00

Jumlah I.2

146,137.50

912,652.00

100 KG MENGERJAKAN BESI BETON

(BOW) 10% BETON HILANG TENAGA Tukang besi

6.7500

Oh

85,000.00

573,750.00

Kepala Tukang

2.2500

Oh

87,500.00

196,875.00

Pekerja

6.7500

Oh

70,000.00

472,500.00

Kg Besi Beton

110.00

Kg

12,200.00

Kg Kawat Tali (blendrat)

2.0000

Kg

17,600.00

BAHAN

Jumlah

1,342,000.00 35,200.00 1,243,125.00

1,377,200.00

49 1

2

F.7

10 M² MEMBUAT BEKISTING LANTAI

3

4

5

6

TENAGA Tukang

3.300 Oh

85,000.00

Kepala Tukang

0.330 Oh

87,500.00

280,500.00 28,875.00

Pekerja/Buruh tak terampil

3.200 Oh

70,000.00

224,000.00

Mandor

0.060 Oh

90,000.00

5,400.00

BAHAN Kayu Tahun

0.40



3,984,700.00

Minyak Begisting

2.00

Ltr

43,000.00

86,000.00

Balok Kayu Tahun

0.15

M3

7,094,000.00

1,064,100.00

Bambu P : 4m

60.00 Btg

30,100.00

1,806,000.00

Paku

4.000

Kg

19,000.00

76,000.00

Teakwood (120x240)cm

3.500

Lbr

134,400.00

470,400.00

Jumlah F.8

1,593,880.00

538,775.00

5,096,380.00

10 M² MEMBUAT BEKISTING TENAGA Tukang

5.000 Oh

85,000.00

425,000.00

Kepala Tukang

0.500 Oh

87,500.00

43,750.00

Pekerja/Buruh tak terampil

2.000 Oh

Mandor

0.100 Oh

90,000.00

9,000.00

Pekerja/Buruh tak terampil

6.000 Oh

70,000.00

420,000.00

BAHAN Kayu Tahun Paku

0.40



3,984,700.00

1,593,880.00

4.000

Kg

19,000.00

76,000.00

Jumlah I

897,750.00

1,669,880.00

1 M ³ BETON BERTULANG UNTUK LANTAI MENGGUANAKAN BESI 100 Kg

6.5

1 M³ MEMBUAT BETON 1 Pc ; 2 Psr ; 3 Kr

I.2

100 KG MENGERJAKAN BESI BETON

F.7

10 M² MEMBUAT BEKISTING Jumlah

II

146,137.50

912,652.00

1,243,125.00

1,377,200.00

538,775.00

5,096,380.00

1,928,037.50

7,386,232.00

146,137.50

912,652.00

1,243,125.00

1,377,200.00

897,750.00

1,669,880.00

2,287,012.50

3,959,732.00

1 M ³ BETON BERTULANG MENGGUANAKAN BESI 100 Kg

6.5

1 M³ MEMBUAT BETON 1 Pc ; 2 Psr ; 3 Kr

I.2

100 KG MENGERJAKAN BESI BETON

F.8

10 M² MEMBUAT BEKISTING Jumlah

III

1 M ³ BETON BERTULANG MENGGUANAKAN BESI 130 Kg

6.5

1 M³ MEMBUAT BETON 1 Pc ; 2 Psr ; 3 Kr

I.2

130 KG MENGERJAKAN BESI BETON

F.8

10 M² MEMBUAT BEKISTING Jumlah

IV

146,137.50

912,652.00

1,616,062.50

1,790,360.00

897,750.00

1,669,880.00

2,659,950.00

4,372,892.00

1 M ³ BETON BERTULANG MENGGUANAKAN BESI 160 Kg

6.5

1 M³ MEMBUAT BETON 1 Pc ; 2 Psr ; 3 Kr

I.2

160 KG MENGERJAKAN BESI BETON

F.8

10 M² MEMBUAT BEKISTING

( I.2 X 1.6 ) Jumlah

V

146,137.50

912,652.00

1,989,000.00

2,203,520.00

897,750.00

1,669,880.00

3,032,887.50

4,786,052.00

1 M ³ BETON BERTULANG MENGGUANAKAN BESI 200 Kg

6.5

1 M³ MEMBUAT BETON 1 Pc ; 2 Psr ; 3 Kr

I.2

200 KG MENGERJAKAN BESI BETON

F.8

10 M² MEMBUAT BEKISTING

( I.2 X 2 )

146,137.50

912,652.00

2,486,250.00

2,754,400.00

897,750.00

1,669,880.00

50 1

2

3 Jumlah

4

5 3,530,137.50

6 5,336,932.00

51 1

2

3

4

5

6

PEKERJAAN PENUTUP ATAP PEKERJAAN PENUTUP ATAP GENTENG 6.1

1 M² PAS. GENTENG PRES BIASA TENAGA Tukang

0.075 Oh

85,000.00

Kepala Tukang

0.008 Oh

87,500.00

6,375.00 700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Genteng Pres

25.000

Bh

4,700.00

Jumlah 6.2

117,500.00 18,295.00

117,500.00

1 M² PAS. GENTENG KODOK TENAGA Tukang

0.075 Oh

85,000.00

6,375.00

Kepala Tukang

0.008 Oh

87,500.00

700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Genteng Kodok

25.000

Bh

4,100.00

Jumlah 6.3

102,500.00 18,295.00

102,500.00

1 M² PAS. GENTENG KACA TENAGA Tukang

0.075 Oh

85,000.00

Kepala Tukang

0.008 Oh

87,500.00

6,375.00 700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Genteng Kaca

25.000

Bh

18,700.00

Jumlah 6.4

467,500.00 18,295.00

467,500.00

1 M² PAS. GENTENG PRES BESAR / MANTILI TENAGA Tukang

0.075 Oh

85,000.00

Kepala Tukang

0.008 Oh

87,500.00

6,375.00 700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Genteng Pres besar / mantili

20.000

Bh

5,100.00

Jumlah 6.5

102,000.00 18,295.00

102,000.00

1 M' PAS. GENTENG BUBUNG PRES BIASA TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.400 Oh

70,000.00

28,000.00

Mandor

0.002 Oh

90,000.00

180.00

BAHAN Genteng Bubung Pres

5.000

Bh

7,800.00

39,000.00

Semen abu-abu / PC

8.000

Kg

1,428.00

11,424.00

Pasir Brantas (beton)

0.032



344,000.00

11,008.00

Jumlah 6.6

46,930.00

61,432.00

1 M' PAS. GENTENG BUBUNG KODOK TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.400 Oh

70,000.00

28,000.00

Mandor

0.002 Oh

90,000.00

180.00

BAHAN Genteng Bubung Kodok

5.000

Bh

7,800.00

39,000.00

Semen abu-abu / PC

8.000

Kg

1,428.00

11,424.00

52 1

2 Pasir Brantas (beton)

3 0.032 Jumlah

4 M³

5

344,000.00

6 11,008.00

46,930.00

61,432.00

53 1 6.7

2

3

4

5

6

1 M² PAS. GENTENG GLAZURR TENAGA Tukang

0.075 Oh

85,000.00

Kepala Tukang

0.008 Oh

87,500.00

6,375.00 700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Genteng Glazurr

25.000

Bh

15,600.00

Jumlah 6.8

390,000.00 18,295.00

390,000.00

1 M' PAS. GENTENG BUBUNG GLAZURR TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.400 Oh

70,000.00

28,000.00

Mandor

0.002 Oh

90,000.00

180.00

Genteng Bubung Glazurr

4.000

Bh

30,700.00

122,800.00

Semen abu-abu / PC

8.000

Kg

1,428.00

11,424.00

Pasir Brantas (beton)

0.032



344,000.00

BAHAN

11,008.00 46,930.00

6.9

145,232.00

1 M² ONGKOS PAS. GENTENG LAMA TENAGA Tukang

0.075 Oh

85,000.00

Kepala Tukang

0.008 Oh

87,500.00

700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

0.008 Oh

90,000.00

Mandor

Jumlah

6,375.00

720.00 18,295.00

PEKERJAAN PENUTUP ASBES GELOMBANG 6.10

1 M' PAS. ATAP ASBES GELOMBANG BESAR ( 1,05 X 3 m ) TEBAL 4 MM TENAGA Tukang

0.070 Oh

85,000.00

5,950.00

Kepala Tukang

0.007 Oh

87,500.00

612.50

Pekerja/Buruh tak terampil

0.140 Oh

70,000.00

9,800.00

Mandor

0.007 Oh

90,000.00

630.00

BAHAN Asbes Gel.Besar(1.05x 3m)x4mm

0.350

Lbr

105,700.00

36,995.00

Paku Kait

0.120

Kg

26,900.00

3,228.00

Jumlah 6.11

16,992.50

40,223.00

1 M² PAS. ATAP ASBES GELOMBANG KECIL ( 1,80 X 0.8 m ) TEBAL 4 MM TENAGA Tukang

0.070 Oh

85,000.00

Kepala Tukang

0.007 Oh

87,500.00

5,950.00 612.50

Pekerja/Buruh tak terampil

0.140 Oh

70,000.00

9,800.00

Mandor

0.007 Oh

90,000.00

630.00

Asbes Gel. Kecil(1.80x0.8m)x4mm

0.830

Lbr

46,400.00

Paku Kait

0.120

Kg

26,900.00

BAHAN

Jumlah 6.12

38,512.00 3,228.00 16,992.50

41,740.00

1 M' PAS. BUBUNG ASBES GELOMBANG ( 1.08 ) M TENAGA Tukang

0.125 Oh

85,000.00

10,625.00

Kepala Tukang

0.013 Oh

87,500.00

1,137.50

Pekerja/Buruh tak terampil

0.084 Oh

70,000.00

5,880.00

Mandor

0.004 Oh

90,000.00

360.00

Bubung Asbes Gel. Besar

2.050

Lbr

96,600.00

Paku Skrup

6.000

bh

950.00

BAHAN

Jumlah

198,030.00 5,700.00 18,002.50

203,730.00

54 1 6.13

2

3

4

5

6

1 M² PAS. GENTENG BETON TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

8,500.00 875.00

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

BAHAN Genteng Beton Paku

11.000

Bh

9,000.00

0.030

Kg

19,000.00

Jumlah 6.14

99,000.00 570.00 24,275.00

99,570.00

1 M' PAS. BUBUNG GENTENG BETON TENAGA Tukang

0.200 Oh

85,000.00

Kepala Tukang

0.020 Oh

87,500.00

17,000.00 1,750.00

Pekerja/Buruh tak terampil

0.400 Oh

70,000.00

28,000.00

Mandor

0.020 Oh

90,000.00

1,800.00

3.500

Bh

12,600.00

BAHAN Bubung Genteng Beton Paku

0.050

Kg

19,000.00

950.00

Semen abu-abu / PC

10.800

Kg

1,428.00

15,422.40

Pasir Brantas (beton)

0.032



344,000.00

11,008.00

Semen Warna

1.000

Kg

2,967.50

Jumlah 6.15

44,100.00

2,967.50 48,550.00

74,447.90

1 M2 PAS. ATAP SIRAP TENAGA Tukang

0.250 Oh

85,000.00

Kepala Tukang

0.025 Oh

87,500.00

21,250.00 2,187.50

Pekerja/Buruh tak terampil

0.166 Oh

70,000.00

11,620.00

Mandor

0.008 Oh

90,000.00

720.00

BAHAN Atap Sirap Kayu Paku

60.000

bh

0.200

Kg

-

Jumlah 6.16

-

19,000.00

3,800.00 35,777.50

3,800.00

1 M' PAS. NOK ATAP SIRAP TENAGA Tukang

0.250 Oh

85,000.00

21,250.00

Kepala Tukang

0.025 Oh

87,500.00

2,187.50

Pekerja/Buruh tak terampil

0.125 Oh

70,000.00

8,750.00

Mandor

0.006 Oh

90,000.00

540.00

BAHAN Seng Plat BJLS 50

0.400

Lbr

41,500.00

16,600.00

Kayu Papan Tahun

0.004



7,245,000.00

28,980.00

Paku

0.110

Kg

19,000.00

Jumlah 6.17

2,090.00 32,727.50

47,670.00

1 M² PAS. ATAP SENG GELOMBANG TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

5,100.00 525.00

Pekerja/Buruh tak terampil

0.120 Oh

70,000.00

8,400.00

Mandor

0.006 Oh

90,000.00

540.00

Seng Gelombang BJLS 28

0.700

Lbr

93,100.00

Paku

0.020

Kg

19,000.00

BAHAN

Jumlah

65,170.00 380.00 14,565.00

65,550.00

55 1 6.18

2

3

4

5

6

1 M' PAS. NOK ATAP SENG GELOMBANG TENAGA Tukang

0.070 Oh

85,000.00

Kepala Tukang

0.008 Oh

87,500.00

5,950.00 700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.006 Oh

90,000.00

540.00

Seng Plat BJLS 28

0.300

Lbr

27,700.00

Paku

0.040

Kg

19,000.00

11,740.00

BAHAN

Jumlah 6.19

8,310.00 760.00 17,690.00

9,070.00

1 M2 PAS. ATAP ALUMINIUM TENAGA Tukang

0.750 Oh

85,000.00

Kepala Tukang

0.008 Oh

87,500.00

63,750.00 700.00

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.006 Oh

90,000.00

540.00

11,740.00

BAHAN Atap Aluminium Gelombang

1.050

M2

Paku

0.020

Kg

-

Jumlah 6.20

-

19,000.00

380.00 75,490.00

380.00

1 M' PAS. NOK ATAP ALUMINIUM TENAGA Tukang

1.000 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

85,000.00 875.00

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.010 Oh

90,000.00

900.00

8,775.00

BAHAN Nok Standar 40 Cm 18 swg 22

1.200

M2

Paku

0.040

Kg

-

Jumlah 6.21

-

19,000.00

760.00 93,775.00

760.00

1 M2 PAS. ATAP ALUMINIUM FOIL / SISALATION TENAGA Tukang

0.050 Oh

85,000.00

Kepala Tukang

0.005 Oh

87,500.00

4,250.00 437.50

Pekerja/Buruh tak terampil

0.150 Oh

70,000.00

10,500.00

Mandor

0.008 Oh

90,000.00

720.00

11,657.50

BAHAN Atap Aluminium Gelombang

1.050

M2

-

Jumlah

15,907.50

-

PEKERJAAN PENUTUP LANGIT - LANGIT 6.1

1 M² PAS. LANGIT - LANGIT ASBES / ETERNIT ( 100 X 100 )CM TENAGA Tukang

0.070 Oh

85,000.00

Kepala Tukang

0.007 Oh

87,500.00

612.50

Pekerja/Buruh tak terampil

0.030 Oh

70,000.00

2,100.00

0.0015 Oh

90,000.00

135.00

Mandor

5,950.00

BAHAN Plat asbes ( Eternit DN ) Paku Eternit

1.100



17,900.00

0.010

Kg

26,500.00

Jumlah 6.2

19,690.00 265.00 8,797.50

19,955.00

1 M² PAS. LANGIT - LANGIT AKUSTIK ( 60 X 120 ) CM TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.060 Oh

70,000.00

4,200.00

Mandor

0.003 Oh

90,000.00

270.00

BAHAN Akustik Arm Strong (60x120 )cm

1.500

Lbr

284,700.00

427,050.00

56 1

2 Paku Eternit

3 0.050 Jumlah

4 Kg

5

26,500.00

6 1,325.00

13,845.00

428,375.00

57 1 6.3

2

3

4

5

6

1 M² PAS. LANGIT - LANGIT TEAKWOOD ( 60 X 120 ) CM TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.070 Oh

70,000.00

4,900.00

0.0035 Oh

90,000.00

315.00

Mandor

8,500.00

BAHAN teakwood ( 120x240 ) cm

0.375

Lbr

134,400.00

Paku Eternit

0.030

Kg

26,500.00

Jumlah 6.4

50,400.00 795.00 14,590.00

51,195.00

1 M² PAS. LANGIT - LANGIT ASBES / ETERNIT ( 100 X 100 ) cm PLAFON KAMPER TENAGA Tukang

0.320 Oh

85,000.00

Kepala Tukang

0.032 Oh

87,500.00

2,800.00

Pekerja/Buruh tak terampil

0.180 Oh

70,000.00

12,600.00

0.0770 Oh

90,000.00

6,930.00

Mandor

27,200.00

BAHAN Kayu kamper

0.0154



15,093,000.00

Paku

0.200

Kg

19,000.00

3,800.00

Plat Asbes ( Eternit )

1.100



17,900.00

19,690.00

0.010

Kg

26,500.00

Paku Eternit

Jumlah 6.5

232,432.20

265.00 49,530.00

256,187.20

1 M² PAS. LANGIT - LANGIT AKUSTIK ( 60 X 120 ) cm PLAFON KAMPER TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.260 Oh

70,000.00

18,200.00

0.0130 Oh

90,000.00

1,170.00

Mandor

34,000.00

BAHAN Kayu kanper

0.0163



15,093,000.00

Paku

0.250

Kg

19,000.00

4,750.00

Akustik Arm Strong ( 60x120) cm

1.500

Lbr

284,700.00

427,050.00

0.050

Kg

26,500.00

Paku Eternit

Jumlah 6.6

246,015.90

1,325.00 56,870.00

679,140.90

1 M² PAS. LANGIT - LANGIT TEAKWOOD ( 60 X 120 ) cm PLAFON KAMPER TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.270 Oh

70,000.00

18,900.00

0.0140 Oh

90,000.00

1,260.00

Mandor

34,000.00

BAHAN Kayu kanper

0.0163



15,093,000.00

Paku

0.250

Kg

19,000.00

4,750.00

teakwood (120x240 ) cm

0.375

Lbr

134,400.00

50,400.00

Paku Eternit

0.030

Kg

26,500.00

795.00

Jumlah 6.7

246,015.90

57,660.00

301,960.90

1 M² PAS. LANGIT - LANGIT ASBES / ETERNIT ( 100 X 100 ) cm PLAFON KRUING TENAGA Tukang

0.320 Oh

85,000.00

Kepala Tukang

0.032 Oh

87,500.00

2,800.00

Pekerja/Buruh tak terampil

0.180 Oh

70,000.00

12,600.00

0.0770 Oh

90,000.00

6,930.00

Mandor

27,200.00

BAHAN kayu kruing

0.0154



10,263,000.00

Paku

0.200

Kg

19,000.00

3,800.00

Plat Asbes ( Eternit )

1.100



17,900.00

19,690.00

0.010

Kg

26,500.00

Paku Eternit

Jumlah

158,050.20

265.00 49,530.00

181,805.20

58 1 6.8

2

3

4

5

6

1 M² PAS. LANGIT - LANGIT AKUSTIK ( 60 X 120 ) cm PLAFON KRUING TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.260 Oh

70,000.00

18,200.00

0.0130 Oh

90,000.00

1,170.00

Mandor

34,000.00

BAHAN Kayu Kruing

0.0163



10,263,000.00

Paku

0.250

Kg

19,000.00

4,750.00

Akustik Arm Strong ( 60x120 )cm

1.500

Lbr

284,700.00

427,050.00

0.050

Kg

26,500.00

Paku Eternit

Jumlah 6.9

167,286.90

1,325.00 56,870.00

600,411.90

1 M² PAS. LANGIT - LANGIT TEAKWOOD ( 60 X 120 ) cm PLAFON KRUING TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.270 Oh

70,000.00

18,900.00

0.0140 Oh

90,000.00

1,260.00

Mandor

34,000.00

BAHAN Kayu Kruing

0.0163



10,263,000.00

Paku

0.250

Kg

19,000.00

4,750.00

Teakwood ( 120x240 )cm

0.375

Lbr

134,400.00

50,400.00

Paku Eternit

0.030

Kg

26,500.00

795.00

Jumlah 6.10

167,286.90

57,660.00

223,231.90

1 M² PAS. LANGIT - LANGIT ASBES / ETERNIT ( 100 X 100 ) cm PLAFON MERANTI TENAGA Tukang

0.320 Oh

85,000.00

Kepala Tukang

0.032 Oh

87,500.00

2,800.00

Pekerja/Buruh tak terampil

0.180 Oh

70,000.00

12,600.00

0.0770 Oh

90,000.00

6,930.00

Mandor

27,200.00

BAHAN kayu Meranti

0.0154



8,603,000.00

Paku

0.200

Kg

19,000.00

3,800.00

Plat Asbes ( Eternit )

1.100



17,900.00

19,690.00

0.010

Kg

26,500.00

Paku Eternit

Jumlah 6.11

132,486.20

265.00 49,530.00

156,241.20

1 M² PAS. LANGIT - LANGIT AKUSTIK ( 60 X 120 ) cm PLAFON MERANTI TENAGA Tukang

0.400 Oh

85,000.00

34,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

0.260 Oh

70,000.00

18,200.00

0.0130 Oh

90,000.00

1,170.00

Pekerja/Buruh tak terampil Mandor BAHAN kayu Meranti

0.0163



8,603,000.00

140,228.90

Paku

0.250

Kg

19,000.00

4,750.00

Akustik Arm Strong ( 60x120 )cm

1.500

Lbr

284,700.00

427,050.00

Paku Eternit

0.050

Kg

26,500.00

Jumlah 6.12

1,325.00 56,870.00

573,353.90

1 M² PAS. LANGIT - LANGIT TEAKWOOD ( 60 X 120 ) cm PLAFON MERANTI TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.270 Oh

70,000.00

18,900.00

0.0140 Oh

90,000.00

1,260.00

Mandor

34,000.00

BAHAN kayu Meranti

0.016



8,603,000.00

140,228.90

Paku

0.250

Kg

19,000.00

4,750.00

teakwood ( 120x240 )cm

0.375

Lbr

134,400.00

50,400.00

59 1

2 Paku Eternit

3 0.030 Jumlah

4 Kg

5

26,500.00

6 795.00

57,660.00

196,173.90

60 1 6.13

2

3

4

5

6

1 M² PAS. LANGIT - LANGIT ASBES / ETERNIT ( 100 X 100 ) cm PLAFON TAHUN TENAGA Tukang

0.320 Oh

85,000.00

Kepala Tukang

0.032 Oh

87,500.00

2,800.00

Pekerja/Buruh tak terampil

0.180 Oh

70,000.00

12,600.00

0.0770 Oh

90,000.00

6,930.00

Mandor

27,200.00

BAHAN Kayu Tahun

0.0154



7,094,000.00

Paku

0.200

Kg

19,000.00

3,800.00

Plat Asbes ( Eternit )

1.100



17,900.00

19,690.00

0.010

Kg

26,500.00

Paku Eternit

Jumlah 6.14

109,247.60

265.00 49,530.00

133,002.60

1 M² PAS. LANGIT - LANGIT AKUSTIK ( 60 X 120 ) cm PLAFON TAHUN TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.260 Oh

70,000.00

18,200.00

0.0130 Oh

90,000.00

1,170.00

Mandor

34,000.00

BAHAN Kayu Tahun

0.0163



7,094,000.00

Paku

0.250

Kg

19,000.00

4,750.00

Akustik Arm Strong ( 60x120 )cm

1.500

Lbr

284,700.00

427,050.00

Paku Eternit

0.050

Kg

26,500.00

1,325.00

Jumlah 6.15

115,632.20

56,870.00

548,757.20

1 M² PAS. LANGIT - LANGIT TEAKWOOD ( 60 X 120 ) cm PLAFON TAHUN TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.040 Oh

87,500.00

3,500.00

Pekerja/Buruh tak terampil

0.270 Oh

70,000.00

18,900.00

0.0140 Oh

90,000.00

1,260.00

Mandor

34,000.00

BAHAN Kayu Tahun

0.0163



7,094,000.00

Paku

0.250

Kg

19,000.00

4,750.00

Teakwood ( 120x240 )cm

0.375

Lbr

134,400.00

50,400.00

0.030

Kg

26,500.00

Paku Eternit

Jumlah 6.16

115,632.20

795.00 57,660.00

171,577.20

1 M² PAS. LANGIT - LANGIT GYPSUM BOARD ( 240 X 120 ) cm PLAFON TAHUN TENAGA Tukang

0.350 Oh

85,000.00

29,750.00

Kepala Tukang

0.035 Oh

87,500.00

3,062.50

0.300 Oh

70,000.00

21,000.00

0.0150 Oh

90,000.00

1,350.00

Pekerja/Buruh tak terampil Mandor BAHAN Kayu Tahun

0.0163



7,094,000.00

115,632.20

Paku

0.250

Kg

19,000.00

4,750.00

Gypsum Board ( 120 x 240 ) cm

0.364



96,600.00

35,162.40

Paku Sekrup

0.110

Kg

19,000.00

Jumlah 6.17

2,090.00 55,162.50

157,634.60

1 M² PAS. LANGIT - LANGIT GYPSUM BOARD ( 240 X 120 ) cm PLAFON MERANTI TENAGA Tukang

0.350 Oh

85,000.00

Kepala Tukang

0.035 Oh

87,500.00

3,062.50

Pekerja/Buruh tak terampil

0.300 Oh

70,000.00

21,000.00

0.0150 Oh

90,000.00

1,350.00

Mandor

29,750.00

BAHAN Kayu Meranti

0.0163



8,603,000.00

140,228.90

Paku

0.250

Kg

19,000.00

4,750.00

Gypsum Board ( 120 x 240 ) cm

0.364



96,600.00

35,162.40

61 1

2 Paku Sekrup

3 0.110 Jumlah

4 Kg

5

19,000.00

6 2,090.00

55,162.50

182,231.30

62 1 6.18

2

3

4

5

6

1 M² PAS. LANGIT - LANGIT GYPSUM BOARD ( 240 X 120 ) cm PLAFON KAMPER TENAGA Tukang

0.350 Oh

85,000.00

Kepala Tukang

0.035 Oh

87,500.00

3,062.50

Pekerja/Buruh tak terampil

0.300 Oh

70,000.00

21,000.00

0.0150 Oh

90,000.00

1,350.00

Mandor

29,750.00

BAHAN Kayu Kamper

0.0163



15,093,000.00

Paku

0.250

Kg

19,000.00

4,750.00

Gypsum Board ( 120 x 240 ) cm

0.364



96,600.00

35,162.40

0.110

Kg

19,000.00

Paku Sekrup

Jumlah 6.19

246,015.90

2,090.00 55,162.50

288,018.30

1 M² PAS. LANGIT - LANGIT ASBES / ETERNIT ( 100 X 100 ) cm PLAFON KAYU LAMA TENAGA Tukang

0.320 Oh

85,000.00

Kepala Tukang

0.032 Oh

87,500.00

2,800.00

Pekerja/Buruh tak terampil

0.180 Oh

70,000.00

12,600.00

0.0770 Oh

90,000.00

6,930.00

Mandor

27,200.00

BAHAN Paku

0.200

Kg

19,000.00

3,800.00

Plat Asbes ( Eternit )

1.100



17,900.00

19,690.00

0.010

Kg

26,500.00

Paku Eternit

Jumlah

265.00 49,530.00

23,755.00

PEKERJAAN SANITASI 6.1

1 BH PAS. KLOSET DUDUK / MONOBLOK TENAGA Tukang

1.100 Oh

85,000.00

Kepala Tukang

0.011 Oh

87,500.00

962.50

Pekerja/Buruh tak terampil

3.300 Oh

70,000.00

231,000.00

0.1600 Oh

90,000.00

14,400.00

Mandor

93,500.00

BAHAN Kloset Duduk Monoblok

1.000

Perlengkapan 6 % harga Kloset

0.060

Bh

2,747,000.00

Jumlah 6.2

2,747,000.00

2,747,000.00

164,820.00 339,862.50

2,911,820.00

1 BH PAS. KLOSET JONGKOK PORSELIN TENAGA Tukang

1.500 Oh

85,000.00

127,500.00

Kepala Tukang

0.150 Oh

87,500.00

13,125.00

Pekerja/Buruh tak terampil

1.000 Oh

70,000.00

70,000.00

0.1600 Oh

90,000.00

14,400.00

Mandor BAHAN Kloset Jongkok Porselin

1.000

Bh

178,700.00

178,700.00

Semen abu-abu / PC

6.000

Pasir Brantas (beton)

0.010

Kg

1,428.00

8,568.00



344,000.00

Jumlah 6.3

3,440.00 225,025.00

190,708.00

1 BH PAS. KLOSET JONGKOK TRASO TENAGA Tukang

1.500 Oh

85,000.00

127,500.00

Kepala Tukang

0.300 Oh

87,500.00

26,250.00

Pekerja/Buruh tak terampil

1.000 Oh

70,000.00

70,000.00

Mandor

0.110 Oh

90,000.00

9,900.00

Kloset Jongkok traso

1.000

Bh

60,300.00

60,300.00

Semen abu-abu / PC

6.000

Kg

1,428.00

8,568.00

Pasir Brantas (beton)

0.010



344,000.00

3,440.00

Bata Merah

7.000

Bj

1,260.00

BAHAN

Jumlah

8,820.00 233,650.00

81,128.00

63 1 6.4

2

3

4

5

6

1 BH PAS. WASTAFEL TENAGA Tukang

1.450 Oh

85,000.00

123,250.00

Kepala Tukang

0.150 Oh

87,500.00

13,125.00

Pekerja/Buruh tak terampil

1.200 Oh

70,000.00

84,000.00

0.1000 Oh

90,000.00

9,000.00

Mandor BAHAN Wastafel

1.000

Bh

452,700.00

452,700.00

Perlengkapanya 12 % harga barang

0.120

Semen abu-abu / PC

6.000

Kg

452,700.00

54,324.00

1,428.00

Pasir Brantas (beton)

0.010



344,000.00

8,568.00

Jumlah 6.5

3,440.00 229,375.00

519,032.00

1 BH PAS. BADKIP PORSELIN TENAGA Tukang

0.075 Oh

85,000.00

6,375.00

Kepala Tukang

0.750 Oh

87,500.00

65,625.00

Pekerja/Buruh tak terampil Mandor

Oh

70,000.00

0.2500 Oh

-

90,000.00

22,500.00

BAHAN Badkip

1.000

Perlengkapanya 20 % harga barang

0.200

Bh

4,271,100.00

Jumlah 6.6

4,271,100.00

4,271,100.00

854,220.00 94,500.00

5,125,320.00

1 BH PAS. BAK BETON VOL. 1 M ³ AIR TENAGA Tukang

4.500 Oh

85,000.00

Kepala Tukang

0.900 Oh

87,500.00

382,500.00 78,750.00

Pekerja/Buruh tak terampil

3.500 Oh

70,000.00

245,000.00

Mandor

0.900 Oh

90,000.00

81,000.00

BAHAN Beton 1;2;3

0.564



1,058,789.50

597,157.28

Besi Beton

2,196,000.00

180.00

Kg

12,200.00

Kawat tali

2.400

Kg

17,600.00

42,240.00

Cetakan Kayu Tahun

0.360



7,094,000.00

2,553,840.00

Ubin Porselin

5.000



64,800.00

324,000.00

Perlengkapan 10 % harga total bahan

0.100

324,000.00

32,400.00

Jumlah 6.7

787,250.00

5,745,637.28

1 BH PAS. BAK FIBERGLASS VOL. 1 M ³ AIR TENAGA Tukang

4.500 Oh

85,000.00

Kepala Tukang

0.900 Oh

87,500.00

382,500.00 78,750.00

Pekerja/Buruh tak terampil

3.000 Oh

70,000.00

210,000.00

Mandor

0.900 Oh

90,000.00

81,000.00

BAHAN Bak Fiberglass

1.000

Perlengkapan 12 % harga Fiberglass

0.120

Bh

499,200.00

Jumlah 6.8

499,200.00

499,200.00

59,904.00 752,250.00

559,104.00

1 BH PAS. BUIS BETON, DIA 15 - 20 cm TENAGA Tukang

0.070 Oh

85,000.00

Kepala Tukang

0.007 Oh

87,500.00

5,950.00 612.50

Pekerja/Buruh tak terampil

0.140 Oh

70,000.00

9,800.00

Mandor

0.007 Oh

90,000.00

630.00

BAHAN Buis Beton ø 15 - 20 cm

1.100

Bh

54,200.00

59,620.00

Pas. Batu bata 1: 4

0.027



151,139.00

4,080.75

Semen abu-abu / PC

3.920

Kg

1,428.00

5,597.76

Pasir Brantas (beton)

0.056



344,000.00

19,264.00

0.240



150,800.00

Pasir Urug

Jumlah

36,192.00 16,992.50

124,754.51

64 1 6.9

2

3

4

5

6

1M' PAS. BUIS BETON, DIA 30 cm - 100 cm TENAGA Tukang

0.190 Oh

85,000.00

Kepala Tukang

0.019 Oh

87,500.00

16,150.00 1,662.50

Pekerja/Buruh tak terampil

0.380 Oh

70,000.00

26,600.00

Mandor

0.019 Oh

90,000.00

1,710.00

1.100

Bh

78,400.00

86,240.00

BAHAN Buis Beton ø 30 cm Pas. Batu bata 1 : 3

0.550



154,205.36

84,812.95

Semen abu-abu / PC

10.300

Kg

1,428.00

14,708.40

Pasir Brantas (beton)

0.061



344,000.00

20,984.00

Pasir Urg

0.069



150,800.00

Jumlah 6.10

10,405.20 46,122.50

217,150.55

1 BH PAS. BAK KONTROL BATU BATA UK. 45 X 45 CM TENAGA Tukang

0.473 Oh

85,000.00

Kepala Tukang

0.047 Oh

87,500.00

40,205.00 4,112.50

Pekerja/Buruh tak terampil

1.420 Oh

70,000.00

99,400.00

Mandor

0.071 Oh

90,000.00

6,390.00

BAHAN Pas. Batu bata 1 : 3

0.250



154,205.36

38,551.34

Semen abu-abu / PC

77.000

Kg

1,428.00

109,956.00

Pasir Brantas (beton)

0.220



344,000.00

75,680.00

Besi Beton

2.600

Kg

12,200.00

31,720.00

0.020



343,900.00

Batu Pecah Split 1 - 2 cm

Jumlah 6.11

6,878.00 150,107.50

262,785.34

1 BH PAS. BAK KONTROL BATU BATA UK. 60 X 60 CM TENAGA Tukang

0.720 Oh

85,000.00

61,200.00

Kepala Tukang

0.072 Oh

87,500.00

6,300.00

Pekerja/Buruh tak terampil

2.160 Oh

70,000.00

151,200.00

Mandor

0.108 Oh

90,000.00

9,720.00

BAHAN Pas. Batu bata 1 : 3

0.371



154,205.36

57,210.19

Semen abu-abu / PC

114.000

Pasir Brantas (beton)

0.304

Kg

1,428.00

162,792.00



344,000.00

Besi Beton

104,576.00

4.850

Kg

12,200.00

Batu Pecah Split 1 - 2 cm

59,170.00

0.033



343,900.00

Jumlah 6.12

11,348.70 228,420.00

395,096.89

1 M' PASANG PIPA GALVANIS DIA 1/2 " TENAGA Tukang

0.090 Oh

85,000.00

Kepala Tukang

0.009 Oh

87,500.00

7,650.00 787.50

Pekerja/Buruh tak terampil

0.054 Oh

70,000.00

3,780.00

Mandor

0.027 Oh

90,000.00

2,430.00

BAHAN Pipa Galvanis ø 1/2 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

30,100.00

Jumlah 6.13

36,120.00

36,120.00

12,642.00 14,647.50

48,762.00

1 M' PASANG PIPA GALVANIS DIA 3/4" TENAGA Tukang

0.090 Oh

85,000.00

Kepala Tukang

0.009 Oh

87,500.00

7,650.00 787.50

Pekerja/Buruh tak terampil

0.054 Oh

70,000.00

3,780.00

Mandor

0.027 Oh

90,000.00

2,430.00

12,217.50

BAHAN Pipa Galvanis ø 3/4 " Perlengkapan 35 % Harga Barang

1.20 0.350

M'

38,100.00

45,720.00

45,720.00

16,002.00

65 1

2

3 Jumlah

4

5 14,647.50

6 61,722.00

66 1 6.14

2

3

4

5

6

1 M' PASANG PIPA GALVANIS DIA 1 " TENAGA Tukang

0.090 Oh

85,000.00

Kepala Tukang

0.009 Oh

87,500.00

7,650.00 787.50

Pekerja/Buruh tak terampil

0.054 Oh

70,000.00

3,780.00

Mandor

0.027 Oh

90,000.00

2,430.00

BAHAN Pipa Galvanis ø 1 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

48,100.00 57,720.00

Jumlah 6.15

57,720.00 20,202.00 14,647.50

77,922.00

1 M' PASANG PIPA GALVANIS DIA 1.1/2 " TENAGA Tukang

0.180 Oh

85,000.00

15,300.00

Kepala Tukang

0.018 Oh

87,500.00

1,575.00

Pekerja/Buruh tak terampil

0.108 Oh

70,000.00

7,560.00

0.0054 Oh

90,000.00

486.00

Mandor BAHAN Pipa Galvanis ø 1.1/2 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

64,500.00

77,400.00

77,400.00

27,090.00

Jumlah 6.16

24,921.00

104,490.00

1 M' PASANG PIPA GALVANIS DIA 2 " TENAGA Tukang

0.180 Oh

85,000.00

15,300.00

Kepala Tukang

0.018 Oh

87,500.00

1,575.00

0.108 Oh

70,000.00

7,560.00

0.0054 Oh

90,000.00

486.00

Pekerja/Buruh tak terampil Mandor BAHAN Pipa Galvanis ø 2 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

90,600.00

Jumlah 6.17

108,720.00

108,720.00

38,052.00 24,921.00

146,772.00

1 M' PASANG PIPA GALVANIS DIA 3 " TENAGA Tukang

0.180 Oh

85,000.00

15,300.00

Kepala Tukang

0.018 Oh

87,500.00

1,575.00

0.108 Oh

70,000.00

7,560.00

0.0054 Oh

90,000.00

486.00

Pekerja/Buruh tak terampil Mandor BAHAN Pipa Galvanis ø 3 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

144,400.00

Jumlah 6.18

173,280.00

173,280.00

60,648.00 24,921.00

233,928.00

1 M' PASANG PIPA GALVANIS DIA 4 " TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.225 Oh

85,000.00

19,125.00

0.0225 Oh

87,500.00

1,968.75

0.135 Oh

70,000.00

9,450.00

0.0068 Oh

90,000.00

612.00

BAHAN Pipa Galvanis ø 4 " Perlengkapan 35 % Harga Barang

1.20 0.350 Jumlah

M'

247,900.00

297,480.00

297,480.00

104,118.00 31,155.75

401,598.00

67 1 6.19

2

3

4

5

6

1 M' PASANG PIPA PVC TYPE AW DIA 1/2 " TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Mandor

5,100.00

BAHAN Pipa PVC Type AW ø 1/2 "

1.20

Perlengkapan 35 % Harga Barang

M'

0.350

7,000.00 8,400.00

Jumlah 6.20

8,400.00 2,940.00 8,307.00

11,340.00

1 M' PASANG PIPA PVC TYPE AW DIA 3/4 " TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Mandor

5,100.00

BAHAN Pipa PVC Type AW ø 3/4 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

9,200.00

Jumlah 6.21

11,040.00

11,040.00

3,864.00 8,307.00

14,904.00

1 M' PASANG PIPA PVC TYPE AW DIA 1 " TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Mandor

5,100.00

BAHAN Pipa PVC Type AW ø 1 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

11,600.00 13,920.00

Jumlah 6.22

13,920.00 4,872.00 8,307.00

18,792.00

1 M' PASANG PIPA PVC TYPE AW DIA 1.1/2 " TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Mandor

5,100.00

BAHAN Pipa PVC Type AW ø 1.1/2 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

21,300.00

25,560.00

25,560.00

8,946.00

Jumlah 6.23

8,307.00

34,506.00

1 M' PASANG PIPA PVC TYPE AW DIA 2 " TENAGA Tukang

0.090 Oh

85,000.00

7,650.00

Kepala Tukang

0.009 Oh

87,500.00

787.50

0.054 Oh

70,000.00

3,780.00

0.0027 Oh

90,000.00

243.00

Pekerja/Buruh tak terampil Mandor BAHAN Pipa PVC Type AW ø 2 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

33,300.00

Jumlah 6.24

39,960.00

39,960.00

13,986.00 12,460.50

53,946.00

1 M' PASANG PIPA PVC TYPE AW DIA 3 " TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.135 Oh

85,000.00

11,475.00

0.0135 Oh

87,500.00

1,181.25

0.081 Oh

70,000.00

5,670.00

0.0041 Oh

90,000.00

369.00

BAHAN Pipa PVC Type AW ø 3. "

1.20

M'

60,700.00

72,840.00

68 1

2 Perlengkapan 35 % Harga Barang

3 0.350 Jumlah

4

5

72,840.00

6 25,494.00

18,695.25

98,334.00

69 1 6.25

2

3

4

5

6

1 M' PASANG PIPA PVC TYPE AW DIA 4 " TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.135 Oh

85,000.00

11,475.00

0.0135 Oh

87,500.00

1,181.25

0.081 Oh

70,000.00

5,670.00

0.0041 Oh

90,000.00

369.00

BAHAN Pipa PVC Type AW ø 4 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

79,500.00 95,400.00

Jumlah 6.26

95,400.00 33,390.00 18,695.25

128,790.00

1 M' PASANG PIPA PVC TYPE AW DIA 6 " TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.135 Oh

85,000.00

11,475.00

0.0135 Oh

87,500.00

1,181.25

0.081 Oh

70,000.00

5,670.00

0.0041 Oh

90,000.00

369.00

BAHAN Pipa PVC Type AW ø 6 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

176,400.00

Jumlah 6.27

211,680.00

211,680.00

74,088.00 18,695.25

285,768.00

1 M' PASANG PIPA PVC TYPE C DIA 3/4 " TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Mandor

5,100.00

BAHAN Pipa PVC Type C ø 3/4 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

6,200.00 7,440.00

Jumlah 6.28

7,440.00 2,604.00 8,307.00

10,044.00

1 M' PASANG PIPA PVC TYPE C DIA 1 " TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Mandor

5,100.00

BAHAN Pipa PVC Type C ø 1 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

7,200.00

8,640.00

8,640.00

3,024.00

Jumlah 6.29

8,307.00

11,664.00

1 M' PASANG PIPA PVC TYPE C DIA 1.5 " TENAGA Tukang

0.060 Oh

85,000.00

5,100.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Pekerja/Buruh tak terampil Mandor

8,145.00

BAHAN Pipa PVC Type C ø 1.5 " Perlengkapan 35 % Harga Barang

1.20

M'

0.350

9,200.00

Jumlah 6.30

11,040.00

11,040.00

3,864.00 8,307.00

14,904.00

1 M' PASANG PIPA PVC TYPE C DIA 2 " TENAGA Tukang

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.036 Oh

70,000.00

2,520.00

0.0018 Oh

90,000.00

162.00

Mandor

5,100.00

BAHAN Pipa PVC Type C ø 2 "

1.20

M'

12,600.00

15,120.00

70 1

2 Perlengkapan 35 % Harga Barang

3 0.350 Jumlah

4

5

15,120.00

6 5,292.00

8,307.00

20,412.00

71 1 6.31

2

3

4

5

6

1 M' PASANG PIPA PVC TYPE C DIA 2.5 " TENAGA Tukang

0.090 Oh

85,000.00

Kepala Tukang

0.009 Oh

87,500.00

787.50

Pekerja/Buruh tak terampil

0.054 Oh

70,000.00

3,780.00

0.0027 Oh

90,000.00

243.00

Mandor

7,650.00

BAHAN Pipa PVC Type C ø 2.5 "

1.20

Perlengkapan 35 % Harga Barang

M'

0.350

15,900.00 19,080.00

Jumlah 6.32

19,080.00 6,678.00 12,460.50

25,758.00

1 M' PASANG PIPA PVC TYPE C DIA 3 " TENAGA Tukang

0.135 Oh

85,000.00

11,475.00

Kepala Tukang

0.014 Oh

87,500.00

1,181.25

Pekerja/Buruh tak terampil

0.081 Oh

70,000.00

5,670.00

0.0041 Oh

90,000.00

369.00

Mandor BAHAN Pipa PVC Type C ø 3. "

1.20

Perlengkapan 35 % Harga Barang

M'

0.350

17,800.00

21,360.00

21,360.00

7,476.00

Jumlah 6.33

18,695.25

28,836.00

1 M' PASANG PIPA PVC TYPE C DIA 4 " TENAGA Tukang

0.135 Oh

85,000.00

11,475.00

Kepala Tukang

0.014 Oh

87,500.00

1,181.25

0.081 Oh

70,000.00

5,670.00

0.0041 Oh

90,000.00

369.00

Pekerja/Buruh tak terampil Mandor BAHAN Pipa PVC Type C ø 4 "

1.20

Perlengkapan 35 % Harga Barang

M'

0.350

23,600.00

Jumlah 6.34

28,320.00

28,320.00

9,912.00 18,695.25

38,232.00

1 BH PASANG BAK CUCI STAINLES STEEL TENAGA Tukang

0.300 Oh

85,000.00

25,500.00

Kepala Tukang

0.030 Oh

87,500.00

2,625.00

Pekerja/Buruh tak terampil

0.030 Oh

70,000.00

2,100.00

0.0015 Oh

90,000.00

135.00

Mandor BAHAN Bak Cuci Stainless Steel

1.00

Bh

232,300.00

Water drain + Assesoris

1.000

Stl

101,200.00

Jumlah 6.35

232,300.00 101,200.00 30,360.00

333,500.00

1 BH PASANG BAK CUCI TRASO TENAGA Tukang

0.500 Oh

85,000.00

42,500.00

Kepala Tukang

0.050 Oh

87,500.00

4,375.00

Pekerja/Buruh tak terampil

0.050 Oh

70,000.00

3,500.00

0.0025 Oh

90,000.00

225.00

Mandor BAHAN Bak Cuci Teraso

1.000

Bh

154,205.36

154,205.36

Water drain + Assesoris

1.000

Bh

101,200.00

101,200.00

Semen abu-abu / PC

20.000

M'

1,428.00

28,560.00

Pasir Brantas (beton)

0.050

Kg

344,000.00

17,200.00

Jumlah

50,600.00

301,165.36

72 1 6.36

2

3

4

5

6

1 BH PASANG KRAN DIA "1/2" TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.010 Oh

70,000.00

700.00

Mandor

0.005 Oh

90,000.00

450.00

1.000

Bh

37,400.00

0.025

Bh

3,600.00

BAHAN Kran ø "1/2" Seal tape

Jumlah 6.37

37,400.00 90.00 10,525.00

37,490.00

1 BH PASANG KRAN DIA " 3/4" TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.010 Oh

70,000.00

700.00

Mandor

0.005 Oh

90,000.00

450.00

Kran ø "3/4"

1.000

Bh

50,500.00

50,500.00

Seal tape

0.025

Bh

3,600.00

90.00

BAHAN

Jumlah 6.38

10,525.00

50,590.00

1 BH PASANG AVOOR BAK MANDI TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

0.010 Oh

70,000.00

700.00

0.0050 Oh

90,000.00

450.00

Pekerja/Buruh tak terampil Mandor BAHAN Avoor Bak Mandi

1.000

Bh

50,700.00

Jumlah 6.39

50,700.00 10,525.00

50,700.00

1 BH PASANG AVOOR KAMAR MANDI TENAGA Tukang

0.100 Oh

85,000.00

8,500.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Pekerja/Buruh tak terampil

0.010 Oh

70,000.00

700.00

0.0050 Oh

90,000.00

450.00

Mandor BAHAN Avoor KM

1.000

Bh

62,300.00

Jumlah

62,300.00 10,525.00

62,300.00

PEKERJAAN BESI DAN ALUMINIUM 6.1

1 KG PABRIKASI DAN PASANG RANGKA ATAP BAJA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.077 Oh

85,000.00

0.0006 Oh

87,500.00

6,545.00 52.50

0.196 Oh

70,000.00

13,720.00

0.1400 Oh

90,000.00

12,600.00

BAHAN Baja Profil WF

1.100

Kg

18,400.00

Elektroda 20% x harga bahan

0.200

%

20,240.00

Jumlah 6.2

20,240.00 4,048.00 32,917.50

24,288.00

1 M² PASANG PINTU BESI BAJA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.650 Oh

85,000.00

0.0650 Oh

87,500.00

55,250.00 5,687.50

0.650 Oh

70,000.00

45,500.00

0.0320 Oh

90,000.00

2,880.00

BAHAN Pintu Besi Baja

1.000 Jumlah



1,207,500.00

1,207,500.00 109,317.50

1,207,500.00

73 1

2

6.3

1 M² PASANG JENDELA BESI BAJA

3

4

5

6

TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

1.050 Oh

85,000.00

0.1050 Oh

87,500.00

89,250.00 9,187.50

1.050 Oh

70,000.00

73,500.00

0.00525 Oh

90,000.00

472.50

BAHAN Jendela Besi Baja

1.000



850,900.00

Jumlah 6.4

850,900.00 172,410.00

850,900.00

1 M² PASANG PINTU BESI GANTUNG TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

1.050 Oh

85,000.00

89,250.00

0.1050 Oh

87,500.00

9,187.50

1.050 Oh

70,000.00

73,500.00

0.00525 Oh

90,000.00

472.50

BAHAN Pintu Besi Gantung

1.000



1,285,800.00

Jumlah 6.5

1,285,800.00 172,410.00

1,285,800.00

1 M² PASANG PINTU BESI GULUNG TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

1.200 Oh

85,000.00

102,000.00

0.1200 Oh

87,500.00

10,500.00

1.200 Oh

70,000.00

84,000.00

0.0060 Oh

90,000.00

540.00

BAHAN Pintu Besi Gulung

1.000



550,200.00

Jumlah 6.6

550,200.00 197,040.00

550,200.00

1 M² PASANG PINTU BESI LIPAT Tukang

0.440 Oh

85,000.00

37,400.00

Kepala Tukang

0.044 Oh

87,500.00

3,850.00

Pekerja/Buruh tak terampil

0.440 Oh

70,000.00

30,800.00

Mandor

0.022 Oh

90,000.00

1,980.00

BAHAN Pintu Besi Lipat

1.000



1,257,500.00

Jumlah 6.7

1,257,500.00 74,030.00

1,257,500.00

1 M² PASANG ROLLING DOOR BESI TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

1.200 Oh

85,000.00

102,000.00

0.1200 Oh

87,500.00

10,500.00

1.200 Oh

70,000.00

84,000.00

0.0060 Oh

90,000.00

540.00

BAHAN Rolling door besi

1.000



550,200.00

Jumlah 6.8

550,200.00 197,040.00

550,200.00

1 M² PASANG ROLLING DOOR ALUMUNIUM TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

1.000 Oh

85,000.00

0.1000 Oh

87,500.00

85,000.00 8,750.00

1.000 Oh

70,000.00

70,000.00

0.0500 Oh

90,000.00

4,500.00

BAHAN Rolling door aluminium

1.000 Jumlah



920,700.00

920,700.00 168,250.00

920,700.00

74 1 6.9

2

3

4

5

6

1 M² PASANG PINTU ALUMINIUM TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

1.050 Oh

85,000.00

0.1050 Oh

87,500.00

89,250.00 9,187.50

1.050 Oh

70,000.00

73,500.00

0.0052 Oh

90,000.00

468.00

BAHAN Pintu Aluminium

1.000



543,300.00

Jumlah 6.10

543,300.00 172,405.50

543,300.00

1 M² PASANG DAUN JENDELA KACA ALUMUNIUM TENAGA Tukang

0.085 Oh

85,000.00

7,225.00

Kepala Tukang

0.008 Oh

87,500.00

700.00

Pekerja/Buruh tak terampil

0.085 Oh

70,000.00

5,950.00

Mandor

0.004 Oh

90,000.00

360.00

BAHAN Profil Aluminium

4.400

M1

222,800.00

980,320.00

Profil Kaca

4.500

M1

6,600.00

29,700.00

Sealent

0.270 Tube

15,000.00

4,050.00

Jumlah 6.11

14,235.00

1,014,070.00

1 M² PASANG PINTU KACA RANGKA ALUMINIUM TENAGA Tukang

0.085 Oh

85,000.00

7,225.00

Kepala Tukang

0.008 Oh

87,500.00

700.00

Pekerja/Buruh tak terampil

0.085 Oh

70,000.00

5,950.00

Mandor

0.004 Oh

90,000.00

360.00

BAHAN Profil Aluminium

4.400



288,700.00

1,270,280.00

Profil Kaca

4.500

M'

6,600.00

29,700.00

Sealent

0.270 Tube

15,000.00

4,050.00

Jumlah 6.12

14,235.00

1,304,030.00

1 M² PASANG TERALI BESI TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

1.200 Oh

85,000.00

102,000.00

0.0120 Oh

87,500.00

1,050.00

1.200 Oh

70,000.00

84,000.00

0.0006 Oh

90,000.00

54.00

BAHAN Besi Teralis

1.100



863,300.00

Jumlah 6.13

949,630.00 187,104.00

949,630.00

1 M² PASANG KAWAT HARMONIKA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.100 Oh

85,000.00

0.0100 Oh

87,500.00

8,500.00 875.00

0.100 Oh

70,000.00

7,000.00

0.0005 Oh

90,000.00

45.00

BAHAN Kawat Harmonika

1.100



34,300.00

Paku

0.020

Kg

19,000.00

380.00

0.0018



15,395,000.00

27,711.00

Papan Kayu Kanper

Jumlah

37,730.00

16,420.00

65,821.00

75 1 6.14

2

3

4

5

6

1 M² PASANG KAWAT KASA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.100 Oh

85,000.00

0.0100 Oh

87,500.00

8,500.00 875.00

0.100 Oh

70,000.00

7,000.00

0.0005 Oh

90,000.00

45.00

BAHAN Kawat Kasa Paku Papan Kayu Kanper

1.100



21,700.00

0.020

Kg

19,000.00

380.00

0.0018



15,395,000.00

27,711.00

Jumlah 6.15

23,870.00

16,420.00

51,961.00

1 M² PASANG KAWAT BURUNG TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.100 Oh

85,000.00

0.0100 Oh

87,500.00

8,500.00 875.00

0.100 Oh

70,000.00

7,000.00

0.0005 Oh

90,000.00

45.00

BAHAN Kawat Burung Paku Papan Kayu Kanper

1.100



21,700.00

0.020

Kg

19,000.00

380.00

0.0018



15,395,000.00

27,711.00

Jumlah 6.16

23,870.00

16,420.00

51,961.00

1 M² PASANG KAWAT NYAMUK TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.100 Oh

85,000.00

0.0100 Oh

87,500.00

8,500.00 875.00

0.100 Oh

70,000.00

7,000.00

0.0005 Oh

90,000.00

45.00

BAHAN Kawat Nyamuk Paku Papan Kayu Kanper

1.100



21,700.00

0.020

Kg

19,000.00

380.00

0.0018



15,395,000.00

27,711.00

Jumlah 6.17

23,870.00

16,420.00

51,961.00

1 M² PASANG JENDELA NAKO & TERALIS TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.200 Oh

85,000.00

0.0200 Oh

87,500.00

17,000.00 1,750.00

0.200 Oh

70,000.00

14,000.00

0.0010 Oh

90,000.00

90.00

BAHAN Jendela Nako

1.100



288,900.00

317,790.00

Besi Strip

7.000

M

1

20,800.00

145,600.00

BH

950.00

Paku Biasa (Sekrup 1-2,5 cm)

10.000 Jumlah

6.18

9,500.00 32,840.00

472,890.00

1 M' PASANG TALANG DATAR / MIRING BJLS 28 Lebar 90 cm TENAGA Tukang

0.400 Oh

85,000.00

Kepala Tukang

0.025 Oh

87,500.00

34,000.00 2,187.50

Pekerja/Buruh tak terampil

0.200 Oh

70,000.00

14,000.00

Mandor

0.010 Oh

90,000.00

900.00

Seng Plat BJLS 30

1.050

M1

41,500.00

Paku

0.015

Kg

19,000.00

285.00

Papan Kayu

0.019



7,245,000.00

137,655.00

BAHAN

Jumlah

43,575.00

51,087.50

181,515.00

76 1 6.19

2

3

4

5

6

1 KG PASANG BESI PROFIL TENAGA Tukang Las

0.060 Oh

85,000.00

Kepala Tukang

0.006 Oh

87,500.00

5,100.00 525.00

Pekerja/Buruh tak terampil

0.060 Oh

70,000.00

4,200.00

Mandor

0.003 Oh

90,000.00

270.00

1.150

18,400.00

BAHAN Besi Profil

Kg

Jumlah 6.20

21,160.00 10,095.00

21,160.00

1 KG PASANG RANGKA KUDA-KUDA BAJA IWF TENAGA Tukang Las

0.060 Oh

85,000.00

5,100.00

Kepala Tukang

0.006 Oh

87,500.00

525.00

Pekerja/Buruh tak terampil

0.060 Oh

70,000.00

4,200.00

Mandor

0.003 Oh

90,000.00

270.00

1.150

18,400.00

BAHAN Besi Baja IWF

Kg

Jumlah 6.21

21,160.00 10,095.00

21,160.00

100 KG PEKERJAAN PERAKITAN TENAGA Tukang Besi

0.100 Oh

85,000.00

Kepala Tukang

0.001 Oh

87,500.00

8,500.00 87.50

Pekerja/Buruh tak terampil

0.100 Oh

70,000.00

7,000.00

Mandor

0.005 Oh

90,000.00

459.00

BAHAN Solar

1.000

Ltr

6,100.00

Minyak Pelumas

0.100

Ltr

43,000.00

Jumlah 6.22

6,100.00 4,300.00 16,046.50

10,400.00

1 M2 MENGERJAKAN PINTU BESI PLAT BAJA TEBAL 2 MM RANGKAP, RANGKA BAJA SIKU TENAGA Tukang Las

1.050 Oh

85,000.00

Kepala Tukang

0.105 Oh

87,500.00

89,250.00 9,187.50

Pekerja/Buruh tak terampil

1.050 Oh

70,000.00

73,500.00

Mandor

0.052 Oh

90,000.00

4,680.00

BAHAN Besi Siku L 30,30,3 Kawat Las Besi Plat Baja

15.000

Kg

20,800.00

0.050

Kg

18,400.00

920.00

32.800

Kg

20,800.00

682,240.00

Jumlah 6.23

312,000.00

176,617.50

995,160.00

1 CM MENGERJAKAN PENGELASAN DENGAN LISTRIK TENAGA Tukang Las Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.002 Oh

85,000.00

0.0002 Oh

87,500.00

170.00 17.50

0.004 Oh

70,000.00

280.00

0.0002 Oh

90,000.00

18.00

BAHAN Kawat Las

0.040

Kg

18,400.00

736.00

Solar

0.030

Ltr

6,100.00

183.00

Minyak Pelumas

0.004

Ltr

43,000.00

4.000

172.00 485.50

1,091.00

77 1 6.24

2

3

4

5

6

1 M' KUSEN PINTU ALUMUNIUM PUTIH TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.043 Oh

85,000.00

0.0043 Oh

87,500.00

3,655.00 376.25

0.043 Oh

70,000.00

3,010.00

0.0021 Oh

90,000.00

189.00

BAHAN Kusen Alumunium Putih

1.100

m'

Skrup Fixer

2.000

bh

Sealent

0.060 tube

114,700.00

126,170.00

5,900.00

11,800.00

15,000.00

M' 6.25

900.00 7,230.25

138,870.00

1 M' KUSEN PINTU ALUMUNIUM COKLAT TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.043 Oh

85,000.00

0.0043 Oh

87,500.00

3,655.00 376.25

0.043 Oh

70,000.00

3,010.00

0.0021 Oh

90,000.00

189.00

BAHAN Kusen Alumunium Coklat

1.100

m'

Skrup Fixer

2.000

bh

Sealent

0.060 tube

120,700.00

132,770.00

5,900.00

11,800.00

15,000.00

900.00 7,230.25

145,470.00

PEKERJAAN PENGUNCI DAN KACA 6.1

1 BH PASANG KUNCI TANAM BIASA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.500 Oh

85,000.00

42,500.00

0.0100 Oh

87,500.00

875.00

0.010 Oh

70,000.00

700.00

0.0050 Oh

90,000.00

450.00

BAHAN Kunci Tanam biasa

1.000

Bh

301,800.00

Jumlah 6.2

301,800.00 44,525.00

301,800.00

1 BH PASANG ENGSEL PINTU TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Engsel Pintu

1.000

Bh

21,100.00

Jumlah 6.3

21,100.00 15,180.00

21,100.00

1 BH PASANG PEGANGAN PINTU / DOOR HOLDER TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.500 Oh

85,000.00

42,500.00

0.0500 Oh

87,500.00

4,375.00

0.050 Oh

70,000.00

3,500.00

0.00250 Oh

90,000.00

225.00

BAHAN Door Holder

1.000

Bh

316,800.00

Jumlah 6.4

316,800.00 50,600.00

316,800.00

1 BH PASANG ENGSEL JENDELA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.100 Oh

85,000.00

8,500.00

0.0100 Oh

87,500.00

875.00

0.010 Oh

70,000.00

700.00

0.0005 Oh

90,000.00

45.00

BAHAN Engsel Jendela

1.000

Bh

21,500.00

21,500.00

78 1

2

3 Jumlah

4

5 10,120.00

6 21,500.00

79 1 6.5

2

3

4

5

6

1 BH PASANG KAIT ANGIN TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Kait Angin

1.000

Bh

18,200.00

Jumlah 6.6

18,200.00 15,180.00

18,200.00

1 BH PASANG REL PINTU DORONG TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.600 Oh

85,000.00

51,000.00

0.0600 Oh

87,500.00

5,250.00

0.060 Oh

70,000.00

4,200.00

0.0030 Oh

90,000.00

270.00

BAHAN Rel Pintu Dorong

1.000

Bh

286,000.00

Jumlah 6.7

286,000.00 60,720.00

286,000.00

1 M² PASANG KACA BIASA TEBAL 3 MM TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Kaca Biasa 3 mm

1.100



142,800.00

Jumlah 6.8

157,080.00 15,180.00

157,080.00

1 M² PASANG KACA BIASA TEBAL 5 MM TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Kaca Biasa 5 mm

1.100



197,700.00

Jumlah 6.9

217,470.00 15,180.00

217,470.00

1 M² PASANG KACA RIBEN TEBAL 5 MM TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Kaca Riben 5 mm

1.100



239,900.00

Jumlah 6.10

263,890.00 15,180.00

263,890.00

1 BH PASANG GRENDEL JENDELA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Grendel

1.000 Jumlah

Bh

24,100.00

24,100.00 15,180.00

24,100.00

80 1 6.11

2

3

4

5

6

1 BH PASANG GRENDEL PINTU TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Grendel Pintu Panjang

1.000

Bh

60,300.00

Jumlah 6.12

60,300.00 15,180.00

60,300.00

1 BH PASANG KACA HIAS/PATRI TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Kaca Patri

1.100

M2

579,600.00

Jumlah 6.13

637,560.00 15,180.00

637,560.00

1 BH PASANG KACA CERMIN TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.150 Oh

85,000.00

12,750.00

0.0150 Oh

87,500.00

1,312.50

0.015 Oh

70,000.00

1,050.00

0.00075 Oh

90,000.00

67.50

BAHAN Kaca Cermin

1.100

M2

239,900.00

Jumlah

263,890.00 15,180.00

263,890.00

PEKERJAAN PENUTUP LANTAI DAN DINDING 6.1

1 M² PASANG LANTAI TEGEL ABU - ABU TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.130 Oh

85,000.00

11,050.00

0.0130 Oh

87,500.00

1,137.50

0.270 Oh

70,000.00

18,900.00

0.01400 Oh

90,000.00

1,260.00

BAHAN Tegel Abu - Abu

1.043



54,800.00

57,156.40

Semen abu-abu / PC

10.400

Kg

1,428.00

14,851.20

Pasir Brantas (beton)

0.045



344,000.00

15,480.00

Jumlah 6.2

32,347.50

87,487.60

1 M² PASANG LANTAI TEGEL KERAMIK POLOS TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.350 Oh

85,000.00

29,750.00

0.0350 Oh

87,500.00

3,062.50

0.620 Oh

70,000.00

43,400.00

0.03000 Oh

90,000.00

2,700.00

BAHAN Tegel Keramik

1.043



53,800.00

Semen Warna

1.500

Kg

2,967.50

4,451.25

10.000

Kg

1,428.00

14,280.00

0.045



344,000.00

Semen abu-abu / PC Pasir Brantas (beton)

Jumlah

56,113.40

15,480.00 78,912.50

90,324.65

81 1 6.3

2

3

4

5

6

1 M² PASANG LANTAI TEGEL KERAMIK WARNA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.350 Oh

85,000.00

0.0350 Oh

87,500.00

29,750.00 3,062.50

0.620 Oh

70,000.00

43,400.00

0.03000 Oh

90,000.00

2,700.00

BAHAN Tegel Keramik Semen Warna Semen abu-abu / PC Pasir Brantas (beton)

1.043



62,300.00

1.500

Kg

2,967.50

4,451.25

10.000

Kg

1,428.00

14,280.00

0.045



344,000.00

Jumlah 6.4

64,978.90

15,480.00 78,912.50

99,190.15

1 M' PASANG PLINT KERAMIK ARTISTIK 10 X 20 Cm TENAGA Tukang

0.090 Oh

85,000.00

Kepala Tukang

0.009 Oh

87,500.00

7,650.00 787.50

Pekerja/Buruh tak terampil

0.090 Oh

70,000.00

6,300.00

Mandor

0.005 Oh

90,000.00

450.00

Plint Keramik Artistik

1.050

M'

90,500.00

Semen Warna

0.025

Kg

2,967.50

74.19

Semen abu-abu / PC

1.140

Kg

1,428.00

1,627.92

Pasir Brantas (beton)

0.0030



344,000.00

1,032.00

BAHAN

Jumlah 6.5

95,025.00

15,187.50

97,759.11

1 M² PASANG LANTAI BATU MARMER PUTIH (100x100) CM TENAGA Tukang

0.350 Oh

85,000.00

29,750.00

Kepala Tukang

0.035 Oh

87,500.00

3,062.50

Pekerja/Buruh tak terampil

0.620 Oh

70,000.00

43,400.00

Mandor

0.030 Oh

90,000.00

2,700.00

BAHAN Batu Marmer Putih

1.060



343,700.00

364,322.00

Semen Warna

0.650

Kg

2,967.50

1,928.88

Semen abu-abu / PC

8.190

Kg

1,428.00

11,695.32

Pasir Brantas (beton)

0.045



344,000.00

15,480.00

Jumlah 6.6

78,912.50

393,426.20

1 M² PASANG LANTAI BATU MARMER HITAM (100x100) CM TENAGA Tukang

0.350 Oh

85,000.00

29,750.00

Kepala Tukang

0.035 Oh

87,500.00

3,062.50

Pekerja/Buruh tak terampil

0.620 Oh

70,000.00

43,400.00

Mandor

0.030 Oh

90,000.00

2,700.00

BAHAN Batu Marmer Hitam

1.060



401,300.00

Semen Warna

0.650

Kg

2,967.50

1,928.88

Semen abu-abu / PC

8.190

Kg

1,428.00

11,695.32

0.045



344,000.00

Pasir Brantas (beton)

Jumlah 6.7

425,378.00

15,480.00 78,912.50

454,482.20

1 M² PASANG DINDING KERAMIK POLOS TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.600 Oh

70,000.00

42,000.00

Mandor

0.030 Oh

90,000.00

2,700.00

Keramik Dinding Polos

1.020



63,400.00

Semen Warna

1.940

Kg

2,967.50

5,756.95

Semen abu-abu / PC

9.300

Kg

1,428.00

13,280.40

BAHAN 64,668.00

82 1

2 Pasir Brantas (beton)

3 0.018 Jumlah

4 M³

5

344,000.00

6 6,192.00

86,887.50

89,897.35

83 1 6.8

2

3

4

5

6

1 M² PASANG DINDING KERAMIK WARNA TENAGA Tukang

0.450 Oh

85,000.00

Kepala Tukang

0.045 Oh

87,500.00

38,250.00 3,937.50

Pekerja/Buruh tak terampil

0.600 Oh

70,000.00

42,000.00

Mandor

0.030 Oh

90,000.00

2,700.00

Keramik Dinding Warna

1.020



70,400.00

Semen Warna

1.940

Kg

2,967.50

5,756.95

Semen abu-abu / PC

9.300

Kg

1,428.00

13,280.40

0.018



344,000.00

BAHAN

Pasir Brantas (beton)

Jumlah 6.9

71,808.00

6,192.00 86,887.50

97,037.35

1 M² PASANG DINDING BATU MARMER PUTIH (100x100) CM TENAGA Tukang

0.650 Oh

85,000.00

Kepala Tukang

0.065 Oh

87,500.00

55,250.00 5,687.50

Pekerja/Buruh tak terampil

0.720 Oh

70,000.00

50,400.00

Mandor

0.035 Oh

90,000.00

3,150.00

BAHAN Batu Marmer Putih

1.020



343,700.00

Paku

2.000

Bh

1,700.00

3,400.00

Semen abu-abu / PC

12.440

Kg

1,428.00

17,764.32

Pasir Brantas (beton)

0.025



344,000.00

8,600.00

0.650

Kg

2,967.50

Semen Warna

Jumlah 6.10

350,574.00

1,928.88 114,487.50

382,267.20

1 M² PASANG DINDING BATU MARMER HITAM (100x100) CM TENAGA Tukang

0.650 Oh

85,000.00

55,250.00

Kepala Tukang

0.065 Oh

87,500.00

5,687.50

Pekerja/Buruh tak terampil

0.720 Oh

70,000.00

50,400.00

Mandor

0.035 Oh

90,000.00

3,150.00

BAHAN Batu Marmer Hitam

1.020



401,300.00

409,326.00

Paku

2.000

Bh

1,700.00

3,400.00

Semen abu-abu / PC

12.440

Kg

1,428.00

17,764.32

Pasir Brantas (beton)

0.025



344,000.00

8,600.00

Semen Warna

0.650

Kg

2,967.50

Jumlah 6.11

1,928.88 114,487.50

441,019.20

1 M² PASANG DINDING BATU TEMPEL TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.350 Oh

85,000.00

0.0350 Oh

87,500.00

29,750.00 3,062.50

0.620 Oh

70,000.00

43,400.00

0.03000 Oh

90,000.00

2,700.00

BAHAN Batu Tempel ( Bobos Warna )

1.100



241,500.00

265,650.00

Semen abu-abu / PC

11.750

Kg

1,428.00

16,779.00

Pasir Brantas (beton)

0.035



344,000.00

Jumlah

12,040.00 78,912.50

294,469.00

84 1 6.12

2

3

4

5

6

1 M² PASANG DINDING KLINGKER TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.035 Oh

85,000.00

0.0350 Oh

87,500.00

2,975.00 3,062.50

0.620 Oh

70,000.00

43,400.00

0.03000 Oh

90,000.00

2,700.00

BAHAN Klingker Paku Semen abu-abu / PC Pasir Brantas (beton)

1.020



603,700.00

0.001

Kg

19,000.00

19.00

12.440

Kg

1,428.00

17,764.32

0.035



344,000.00

Jumlah 6.13

615,774.00

12,040.00 52,137.50

645,597.32

1 M² PASANG PAVING STONE POLOS NON KONTRUKSI TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.250 Oh

85,000.00

0.0250 Oh

87,500.00

21,250.00 2,187.50

0.250 Oh

70,000.00

17,500.00

0.0250 Oh

90,000.00

2,250.00

BAHAN Paving Stone Polos Pasir Lokal

30.000

Bh

1,800.00

0.050

M3

120,700.00

Jumlah 6.14

54,000.00 6,035.00 43,187.50

60,035.00

1 M² PASANG PAVING STONE WARNA NON KONTRUKSI TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.250 Oh

85,000.00

0.0250 Oh

87,500.00

21,250.00 2,187.50

0.250 Oh

70,000.00

17,500.00

0.0250 Oh

90,000.00

2,250.00

BAHAN Paving Stone Warna Pasir Lokal

30.000

Bh

1,900.00

0.050

M3

120,700.00

Jumlah 6.15

57,000.00 6,035.00 43,187.50

63,035.00

1 M2 PASANG PAVING STONE / CONBLOK ABU-ABU TEBAL 6 CM K 175 Tenaga : Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.250 Oh

85,000.00

0.0250 Oh

87,500.00

21,250.00 2,187.50

0.250 Oh

70,000.00

17,500.00

0.0250 Oh

90,000.00

2,250.00

50 M2

1,800.00

0.050 M3

120,700.00

Bahan : Paving Stone / Conblok abu - abu tebal 6 c

Pasir Lokal

Jumlah 6.16

90,000.00 6,035.00 43,187.50

96,035.00

1 M2 PASANG PAVING STONE / CONBLOK WARNA TEBAL 6 CM K 175 Tenaga : Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.250 Oh

85,000.00

0.0250 Oh

87,500.00

21,250.00 2,187.50

0.250 Oh

70,000.00

17,500.00

0.0250 Oh

90,000.00

2,250.00

50 M2

1,900.00

0.050 M3

120,700.00

Bahan : Paving Stone / Conblok warna tebal 6 cm

Pasir Lokal

Jumlah

95,000.00 6,035.00 43,187.50

101,035.00

85 1 6.17

2

3

4

5

6

1 M2 PASANG PAVING STONE / CONBLOK ABU-ABU TEBAL 6 CM K225 Tenaga : Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.250 Oh

85,000.00

0.0250 Oh

87,500.00

21,250.00 2,187.50

0.250 Oh

70,000.00

17,500.00

0.0250 Oh

90,000.00

2,250.00

Bahan : Paving Stone /Conblok abu - abu tebal 6 cm

Pasir Lokal

50 M2

2,000.00

0.050 M3

120,700.00

Jumlah 6.18

100,000.00 6,035.00 43,187.50

106,035.00

1 M2 PASANG PAVING STONE / CONBLOK WARNA TEBAL 6 CM K225 Tenaga : Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.250 Oh

85,000.00

0.0250 Oh

87,500.00

21,250.00 2,187.50

0.250 Oh

70,000.00

17,500.00

0.0250 Oh

90,000.00

2,250.00

Bahan : Paving Stone / Conblok warna tebal 6 cm

Pasir Lokal

50 M2

2,100.00

0.050 M3

120,700.00

Jumlah 6.19

105,000.00 6,035.00 43,187.50

111,035.00

1 M' PASANG STOPER / TOPI USKUP ABU-ABU K.175 TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.0100 Oh

87,500.00

875.00

Buruh terampil

0.200 Oh

70,000.00

14,000.00

0.0010 Oh

90,000.00

90.00

Mandor

8,500.00

BAHAN Stoper / Topi uskup t=6cm (K 175)

Pasir Lokal

3.340

Bh

6,000.00

0.050



120,700.00

Jumlah 6.20

20,040.00 6,035.00 23,465.00

26,075.00

1 M' PASANG STOPER / TOPI USKUP ABU-ABU K.225 TENAGA Tukang

0.100 Oh

85,000.00

Kepala Tukang

0.0100 Oh

87,500.00

875.00

Buruh terampil

0.200 Oh

70,000.00

14,000.00

0.0010 Oh

90,000.00

90.00

Mandor

8,500.00

BAHAN Stoper / Topi uskup t=6cm ( K225)

3.340

Bh

6,800.00

22,712.00

Pasir Lokal

0.050



120,700.00

6,035.00

Jumlah 6.21

23,465.00

28,747.00

1 M' PASANG KANSTIN TRAP UK15.25.40 K-175 TENAGA Mandor

0.001 Oh

85,000.00

85.00

Kepala Tukang

0.010 Oh

87,500.00

875.00

Tukang

0.050 Oh

70,000.00

3,500.00

Buruh terampil

0.050 Oh

90,000.00

4,500.00

Kanstin Trap uk. 15.25.40 (me)

2.500

Bh

17,800.00

44500

Semen abu-abu / PC

1.000

kg

1,428.00

1428

0.001



344,000.00

BAHAN

Pasir Beton

Jumlah

344 8,960.00

46,272.00

86 1 6.22

2

3

4

5

6

1 M2 PASANGAN BATAKO ( 1 PC : 5 PSR) TENAGA Mandor Lapangan

0.05 Oh

85,000.00

Kepala Tukang Batu

0.02 Oh

87,500.00

4,250.00 1,750.00

Tukang Batu

0.24 Oh

70,000.00

16,800.00

Pekerja / Pekerja Tidak Terlatih

0.72 Oh

90,000.00

64,800.00

12.5 Bj

4,200.00

52500

1.6 Kg

1,428.00

2284.8

0.05 M3

344,000.00

BAHAN Batako Padat Portland Cement Pasir Beton

Jumlah

17200 87,600.00

71,984.80

PEKERJAAN PENGECATAN 6.1

1 M² MENGIKIS / MENGEROK PERMUKAAN CAT LAMA TENAGA Pekerja/Buruh tak terampil Mandor

0.150 Oh

70,000.00

10,500.00

0.00250 Oh

90,000.00

225.00

BAHAN Soda Api

0.050

Kg

58,800.00

Jumlah 6.2

2,940.00 10,725.00

2,940.00

1 M² MENDEMPUL DAN MENGECAT 2X SELESAI TEMBOK BARU TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.063 Oh

85,000.00

0.0063 Oh

87,500.00

5,355.00 551.25

0.020 Oh

70,000.00

1,400.00

0.00250 Oh

90,000.00

225.00

BAHAN Cat Tembok Penutup 2X

0.260

Kg

25,000.00

Plamir

0.100

Kg

9,600.00

960.00

Cat Dasar

0.100

kg

25,000.00

2,500.00

Jumlah 6.3

6,500.00

7,531.25

9,960.00

1 M² MENGECAT 2X SELESAI TEMBOK LAMA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.042 Oh

85,000.00

0.0042 Oh

87,500.00

3,570.00 367.50

0.028 Oh

70,000.00

1,960.00

0.00250 Oh

90,000.00

225.00

BAHAN Cat Tembok Penutup 2X

0.180

Kg

25,000.00

Cat Dasar

0.120

Kg

25,000.00

Jumlah 6.4

4,500.00 3,000.00 6,122.50

7,500.00

1 M² MENGECAT 2X SELESAI GENTENG BARU TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.063 Oh

85,000.00

0.0063 Oh

87,500.00

5,355.00 551.25

0.020 Oh

70,000.00

1,400.00

0.00250 Oh

90,000.00

225.00

BAHAN Cat Penutup 2X Cat Dasar

0.260

Kg

59,100.00

0.100

kg

59,100.00

Jumlah

15,366.00 5,910.00 7,531.25

21,276.00

87 1 6.5

2

3

4

5

6

1 M² MENGECAT 2X SELESAI GENTENG LAMA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.042 Oh

85,000.00

0.0042 Oh

87,500.00

3,570.00 367.50

0.028 Oh

70,000.00

1,960.00

0.00250 Oh

90,000.00

225.00

BAHAN Cat Penutup 2X Cat Dasar

0.180

Kg

59,100.00

0.120

Kg

59,100.00

Jumlah 6.6

10,638.00 7,092.00 6,122.50

17,730.00

1 M² MENDEMPUL DAN MENGOSOK BIDANG KAYU TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.040 Oh

85,000.00

0.0040 Oh

87,500.00

3,400.00 350.00

0.040 Oh

70,000.00

2,800.00

0.00250 Oh

90,000.00

225.00

BAHAN Plamir

0.080

Kg

32,600.00

2,608.00

Kertas Gosok

0.200

Lbr

3,800.00

760.00

Minyak Cat

0.020

Kg

28,900.00

Jumlah 6.7

578.00 6,775.00

3,946.00

1 M² MENGECAT BIDANG KAYU LAMA TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.075 Oh

85,000.00

0.0075 Oh

87,500.00

6,375.00 656.25

0.070 Oh

70,000.00

4,900.00

0.00250 Oh

90,000.00

225.00

BAHAN Plamir

0.150

Kg

32,600.00

4,890.00

Cat Dasar

0.170

Kg

69,400.00

11,798.00

0.170

Kg

69,400.00

Cat Penutup EMCO

Jumlah 6.8

11,798.00 12,156.25

28,486.00

1 M² MENDEMPUL DAN MENGECAT 2X SELESAI BIDANG KAYU BARU TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.009 Oh

85,000.00

0.0060 Oh

87,500.00

765.00 525.00

0.070 Oh

70,000.00

4,900.00

0.00250 Oh

90,000.00

225.00

BAHAN Cat Many

0.200

Kg

35,000.00

Plamir

0.150

Kg

32,600.00

4,890.00

Cat Dasar

0.170

Kg

69,400.00

11,798.00

0.260

Kg

69,400.00

Cat Penutup EMCO

Jumlah 6.9

7,000.00

18,044.00 6,415.00

41,732.00

1 M² MELABUR BIDANG KAYU DENGAN TEAK OIL TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.063 Oh

85,000.00

5,355.00

0.0630 Oh

87,500.00

5,512.50

0.040 Oh

70,000.00

2,800.00

0.00250 Oh

90,000.00

225.00

BAHAN Teak Oil

0.360 Jumlah

Ltr

11,500.00

4,140.00 13,892.50

4,140.00

88 1 6.10

2

3

4

5

6

1 M² MELABUR BIDANG KAYU DENGAN PELITUR TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.060 Oh

85,000.00

5,100.00

0.0160 Oh

87,500.00

1,400.00

-

Oh

70,000.00

0.00250 Oh

90,000.00

225.00

BAHAN Pelitur

0.150

Ltr

82,100.00

12,315.00

Pelitur Jadi

0.372

Ltr

86,600.00

32,215.20

Kertas Gosok

2.000

Lbr

3,800.00

7,600.00

Jumlah 6.11

6,725.00

52,130.20

1 M² MELABUR BIDANG KAYU DENGAN RESIDU DAN TER TENAGA Pekerja/Buruh tak terampil Mandor

0.100 Oh

70,000.00

7,000.00

0.00600 Oh

90,000.00

540.00

BAHAN Residu / Ter

0.350

Ltr

22,500.00

7,875.00

Jumlah 6.12

7,540.00

7,875.00

1 M² MELABUR BIDANG KAYU DENGAN VERNIS TENAGA Tukang

0.160 Oh

85,000.00

Kepala Tukang

0.016 Oh

87,500.00

1,400.00

Pekerja/Buruh tak terampil

0.160 Oh

70,000.00

11,200.00

0.00250 Oh

90,000.00

225.00

Mandor

13,600.00

BAHAN Vernis

0.150

Ltr

66,400.00

9,960.00

Dempul

0.050

Kg

42,200.00

2,110.00

Kertas Gosok

0.100

Lbr

3,800.00

380.00

Kuas

0.010

Bh

19,200.00

192.00

Jumlah 6.13

26,425.00

12,642.00

1 M² MENGECAT PERMUKAAN BAJA DENGAN MANY BESI TENAGA Tukang

0.200 Oh

85,000.00

17,000.00

Kepala Tukang

0.020 Oh

87,500.00

1,750.00

Pekerja/Buruh tak terampil

0.020 Oh

70,000.00

1,400.00

Mandor

0.010 Oh

90,000.00

900.00

Meny besi

0.100

Kg

46,600.00

Kuas

0.010

Bh

19,200.00

BAHAN 4,660.00 192.00

Jumlah 6.14

21,050.00

4,852.00

1 M² MENGECAT PERMUKAAN BAJA DENGAN MANY BESI DAN PERANCAH TENAGA Tukang Kepala Tukang Pekerja/Buruh tak terampil Mandor

0.225 Oh

85,000.00

0.0225 Oh

87,500.00

19,125.00 1,968.75

0.250 Oh

70,000.00

17,500.00

0.00750 Oh

90,000.00

675.00

BAHAN Meny besi

0.100

Kg

46,600.00

Kuas

0.010

Bh

19,200.00

192.00

Perancah kayu

0.002



7,094,000.00

14,188.00

Jumlah

4,660.00

39,268.75

19,040.00

TRENGGALEK, 2007 KEPALA DINAS PERUMAHAN DAN PERMUKIMAN TRENGGALEK, PEBRUARI 2017 KABUPATEN TRENGGALEK KEPALA DINAS PEKERJAAN UMUM KEPALA DAN PENATAAN RUANG KABUPATEN TRENGGALEK

Ir. HUSNI HIDAYAT PEMBINA UTAMA MUDA 510 053 573

KABUPATEN TRENGGALEK KEPALA 89 1

2

3

4

5

6

Ir. HUSNI HIDAYAT PEMBINA UTAMA MUDA 510 053 573 Ir. JANU RIANTO, MT NIP. 510 053 573 NIP. 19580131 199011 1 001

90

G DAN PERUMAHAN 2017

Jumlah (Rp.) 7

665,968.10

789,658.10

858,361.10

91 7

153,048.00

2,192,498.00

2,059,449.00

92 7

2,537,519.00

93 7

11,500.00

2,049,948.00

251,599.00

82,296.00

496,660.00

469,660.00

30,910.00

94 7

310,344.00

509,014.20

54,750.00

67,050.00

79,530.00

72,880.00

110,400.00

88,050.00

95 7

3,950.00

40,620.00

15,150.00

39,500.00

123,300.00

120,180.00

202,860.00

170,950.00

341,579.80

96 7

394,480.80

147,450.00

174,593.50

1,182,232.00

1,042,604.00

97 7

969,736.00

926,084.00

895,784.00

874,500.00

845,284.00

98 7

941,132.90

809,237.00

889,366.20

963,915.20

506,258.10

99 7

877,145.20

1,110,794.70

882,195.30

100 7

170,655.40

160,057.60

154,205.36

151,139.00

149,228.04

101 7

148,661.96

146,407.00

144,946.80

144,202.40

155,650.00

102 7

103 7

329,488.00

318,206.60

309,755.40

306,639.60

306,639.60

104 7

308,245.74

264,871.80

264,127.40

854,473.00

105 7

56,606.21

50,442.37

47,978.63

46,129.22

45,309.25

106 7

44,556.55

107 7

43,873.67

40,150.90

40,122.70

42,837.00

34,129.25

108 7

22,220.72

109 7

48,656.52

25,236.00

23,110,250.00

20,302,050.00

20,606,850.00

110 7

10,703,250.00

1,103,705.00

932,025.00

968,265.00

606,025.00

111 7

723,998.00

620,990.00

642,734.00

425,390.00

1,623,068.00

112 7

1,348,380.00

113 7

1,406,364.00

826,780.00

1,408,820.00

1,151,300.00

1,205,660.00

114 7

662,300.00

115 7

859,839.00

752,539.00

775,189.00

548,789.00

116 7

1,119,064.00

117 7

1,011,764.00

1,034,414.00

808,014.00

980,294.00

118 7

872,994.00

895,644.00

669,244.00

227,406.60

119 7

NG BIASA/METAL

233,406.60

22,761,200.00

18,723,100.00

13,130,700.00

120 7

11,304,700.00

121 7

9,644,800.00

1,423,000.00

22,142,600.00

18,104,500.00

12,512,100.00

122 7

10,686,100.00

9,026,200.00

910,800.00

266,909.00

219,186.00

123 7

230,199.00

179,359.00

168,346.00

143,587.00

162,759.00

124 7

147,669.00

111,897.00

76,729.00

65,716.00

40,957.00

125 7

270,274.00

244,577.00

242,799.00

208,989.00

197,369.00

126 7

287,253.00

236,413.00

219,813.00

204,723.00

337,364.70

127 7

276,919.70

202,537.70

176,973.70

153,735.10

44,487.50

357,768.40

128 7

293,790.90

215,061.90

188,003.90

163,407.20

47,775.00

129 7

168,896.40

130 7

137,994.00

144,517.20

107,566.80

79,314.00

27,150.00

243,707.00

131 7

196,495.00

206,461.00

150,009.00

106,845.00

27,150.00

132 7

191,323.20

133 7

154,412.00

162,203.60

118,068.40

84,322.00

588,761.50

134 7

478,861.50

135 7

343,621.50

297,141.50

254,889.50

712,577.50

602,677.50

136 7

467,437.50

420,957.50

378,705.50

13,687.50

18,727.50

137 7

19,987.50

24,397.50

913,254.00

1,058,789.50

2,620,325.00

138 7

5,635,155.00

2,567,630.00

1,058,789.50 2,620,325.00 5,635,155.00 9,314,269.50

1,058,789.50 2,620,325.00 2,567,630.00 6,246,744.50

1,058,789.50 3,406,422.50 2,567,630.00 7,032,842.00

1,058,789.50 4,192,520.00 2,567,630.00 7,818,939.50

1,058,789.50 5,240,650.00 2,567,630.00

139 7

8,867,069.50

140 7

135,795.00

120,795.00

485,795.00

120,295.00

108,362.00

141 7

108,362.00

142 7

408,295.00

192,162.00

18,295.00

57,215.50

58,732.50

221,732.50

143 7

123,845.00

122,997.90

80,397.50

80,115.00

144 7

26,760.00

15,907.50

28,752.50

145 7

442,220.00

146 7

65,785.00

305,717.20

736,010.90

359,620.90

231,335.20

147 7

657,281.90

280,891.90

205,771.20

630,223.90

148 7

253,833.90

149 7

182,532.60

605,627.20

229,237.20

0.0033

212,797.10

150 7

237,393.80

151 7

343,180.80

73,285.00

3,251,682.50

415,733.00

314,778.00

152 7

748,407.00

5,219,820.00

6,532,887.28

1,311,354.00

141,747.01

153 7

263,273.05

412,892.84

623,516.89

63,409.50

154 7

76,369.50

155 7

92,569.50

129,411.00

171,693.00

258,849.00

432,753.75

156 7

19,647.00

23,211.00

27,099.00

42,813.00

66,406.50

157 7

117,029.25

158 7

147,485.25

304,463.25

18,351.00

19,971.00

23,211.00

159 7

28,719.00

160 7

38,218.50

47,531.25

56,927.25

363,860.00

351,765.36

161 7

48,015.00

61,115.00

61,225.00

72,825.00

57,205.50

1,316,817.50

162 7

1,023,310.00

1,458,210.00

747,240.00

1,331,530.00

747,240.00

1,088,950.00

163 7

715,705.50

1,028,305.00

1,318,265.00

1,136,734.00

82,241.00

164 7

68,381.00

68,381.00

68,381.00

505,730.00

232,602.50

165 7

31,255.00

31,255.00

26,446.50

1,171,777.50

1,576.50

166 7

146,100.25

152,700.25

346,325.00

36,280.00

367,400.00

167 7

31,620.00

168 7

33,380.00

346,720.00

172,260.00

232,650.00

279,070.00

39,280.00

169 7

75,480.00

652,740.00

279,070.00

119,835.10

169,237.15

170 7

178,102.65

112,946.61

472,338.70

533,394.70

171 7

176,784.85

172 7

183,924.85

496,754.70

555,506.70

373,381.50

173 7

697,734.82

103,222.50

106,222.50

139,222.50

144,222.50

174 7

149,222.50

154,222.50

49,540.00

52,212.00

55,232.00

175 7

159,584.80

13,665.00

17,491.25

13,622.50

28,807.25

176 7

23,852.50

10,721.00

40,642.25

48,147.00

18,032.50

177 7

58,855.20

15,415.00

39,067.00

25,902.00

58,308.75 2007 AN DAN PERMUKIMAN ENGGALEK LA

IDAYAT MA MUDA 573

ENGGALEK LA

IDAYAT MA MUDA 573

53 573

178 7