REKAPITULASI RENCANA ANGGARAN BIAYA ENGINEERING ESTIMATE PEKERJAAN PEKERJAAN LOKASI

: Fasilitasi Percontohan Ruang Terbuka Publik - Revolusi Mental Kec.Masamba Kab. Luwu Utara : TAMAN LESTARI SULIKAN MASAMBA KAB. LUWU UTARA PROVINSI SULAWESI SELATAN : APBN 2016

URAIAN PEKERJAAN

NO.

JUMLAH HARGA

A

PEKERJAAN PENDAHULUAN

Rp

12.540.000

B

PEKERJAAN KONSTRUKSI DAN VIDEOTRON

Rp

212.840.454

Pekerjaan Pondasi Pekerjaan Pipa dan Besi Pekerjaan Pemasangan Videotron

Rp Rp Rp

20.197.684 67.477.970 125.164.800

45.400.670

B.1 B.2 B.3

PEKERJAAN PAPAN NAWA CITA DAN BUTIR PANCASILA

Rp

C.1 C.2

Pekerjaan Instalasi Kabel & Lampu Sorot Pekerjaan Pondasi dan Dinding

Rp Rp

6.600.000 15.727.167

C.3

Pekerjaan Bangku Taman

Rp

23.073.503

PEKERJAAN AKHIR

Rp

2.500.000

Pekerjaan Pembersihan Sisa Pekerjaan

Rp

2.500.000

C

D D.1

REAL COST PPN 10% TOTAL HARGA DIBULATKAN

Rp Rp Rp

273.281.124 27.328.112 300.609.236

Rp

300.609.000

Terbilang : TIGA RATUS JUTA ENAM RATUS SEMBILAN RIBU RUPIAH

Dibuat Oleh Penawar, CV. FILZAH UTAMA

RUSDI AMIR Direktur

R.A.B RENCANA ANGGARAN BIAYA ENGINEERING ESTIMATE PEKERJAAN LOKASI TAHUN ANGGARAN

NO.

URAIAN PEKERJAAN

I

II PEKERJAAN PENDAHULUAN Mobilisasi Alat dan Bahan Bangsal Kerja Dokumentasi & Pelaporan Sambungan Listrik 5000 Watt Biaya Perizinan

A A.1 A.2 A.3 A.4 A.5

B B.1 B.1.1 B.1.2 B.1.3 B.1.4 a b c d B.1.5 B.1.6

: Fasilitasi Percontohan Ruang Terbuka Publik - Revolusi Mental Kec.Masamba Kab. Luwu Utara : TAMAN LESTARI SULIKAN MASAMBA KAB. LUWU UTARA PROVINSI SULAWESI SELATAN : APBN 2016

PEKERJAAN KONSTRUKSI DAN VIDEOTRON Pekerjaan Pondasi Galian Tanah Pasir Urug Lantai Kerja 5 cm Pekerjaan Poer Plat Bekisting Besi D.16 Besi Begel 12 Beton K.225 Urugan Kembali Pas. Angkur Baut 16mm dan Plat Dudukan Tiang 10 mm

VOLUME

SATUAN

HARGA SATUAN

JUMLAH HARGA

III

IV

V

VI

72,00 1,00 1,00 1,00 1,00

jam/hari Ls Ls Unit Ls

Rp Rp Rp Rp Rp

70.000 2.500.000 1.000.000 3.000.000 1.000.000 TOTAL

Rp Rp Rp Rp Rp Rp

5.040.000 2.500.000 1.000.000 3.000.000 1.000.000 12.540.000

20,00 0,40 0,40

m3 m3 m3

Rp Rp Rp

66.150 152.460 876.325

Rp Rp Rp

1.323.000 60.984 350.530

30,80 343,81 42,89 9,65 5,00 1,00

m2 kg kg m3 m3 Ls

Rp Rp Rp Rp Rp Rp

99.981 14.871 14.871 921.412 48.300 500.000

Rp Rp Rp Rp Rp Rp Rp

3.079.415 5.112.820 637.811 8.891.623 241.500 500.000 20.197.684

296.360 296.360 154.518 102.018 516.338 500.000

Rp Rp Rp Rp Rp Rp Rp

4.149.046 5.319.669 21.138.062 7.741.126 28.130.067 1.000.000 67.477.970

TOTAL B.2 B.2.1 B.2.2 B.2.3 B.2.4 B.2.5 B.2.6

Pekerjaan Pipa dan Besi Pekerjaan Tiang Pipa Besi 16 Inc -7,8 mm Pekerjaan Melintang Pipa Besi 16 Inc - 7,8 mm Pekerjaan Pipa Besi GIP 2 Inc Pekerjaan Pipa Besi GIP 1,5 Inc Pasangan Alcovan + Rangka Siku 4.4 Aksesoris Plat besi Ukiran Bugis (dilubang)

14,00 17,95 136,80 75,88 54,48 2,00

m1 m1 m1 m1 m2 Ls

Rp Rp Rp Rp Rp Rp TOTAL

B.3 B.3.1 B.3.2 B.3.3 B.3.4 B.3.5 B.3.6 B.3.7 B.3.8

Pekerjaan Pemasangan Videotron Panel LED Screen (termasuk Hanging Bar) Controller Receiving Card Multifungtion Card Ligth Sensor UPS PC/Prosessing Computer (Prosessor Core i3, HD 500GB, RAM 8GB, VGA 2 GB) Speaker Outdor Sistem + Aksesoris

10,00 9,22 1,00 10,00 1,00 1,00 1,00

m2 m2 Unit Unit Unit Unit Unit

Rp Rp Rp Rp Rp Rp

5.000.000 5.000.000 2.000.000 5.000.000 5.000.000 5.000.000

Rp Rp Rp Rp Rp Rp

46.080.000 5.000.000 20.000.000 5.000.000 5.000.000 5.000.000

1,00

Unit

Rp

12.000.000

Rp

12.000.000

2,00

Unit

Rp

10.000.000

Rp

20.000.000

1,00

Unit

Rp Rp Rp Rp

118.080.000 7.084.800 125.164.800

Spesifikasi: Rated Input Selection / Impedance : 25W (100V Line) Sensitivity : 98dB (1W) Frequency Response : 120 ~ 150.000Hz Speaker Component : 12cm Cone - Type Horizontal Directivity Constant Horn : 90° (±45° Horizontal From Front Axis) 98dB or More (1W) Speaker Cord : 2-Core Cabtyre Cord With Diameter of 6mm Operating Temperature : -20 to +55 Dust/Water Protection : IP65 Bracket : Stainless Steel Net : Aluminium Screw : Stainless Steel Dimension : 366 x 230 x 272mm (WxHxD) B.3.7

IPC (Outdor) / Box Panel & Aksesoris

JUMLAH OVER HEAD 7% TOTAL

C C.1 C.1.1 C.1.2 C.1.2

PEKERJAAN PAPAN NAWA CITA DAN BUTIR PANCASILA Pekerjaan Instalasi Kabel & Lampu Sorot Box Panel & Aksesoris 1,00 Instalasi Kabel Tanam NYY 3x4 mm 100,00 Pasang Lampu Sorot 50 Watt 2,00

bh m' bh

Rp Rp Rp

2.500.000 21.000 1.000.000 TOTAL

Rp Rp Rp Rp

2.500.000 2.100.000 2.000.000 6.600.000

C.2 C.2.1 C.2.2 C.2.3 C.2.4 C.2.5 C.2.6 C.2.7 C.2.8 C.2.9 C.2.10 C.2.11 C.2.12 C.2.13 C.2.15 C.2.16 C.2.17

Pekerjaan Pondasi dan Dinding Galian Pondasi Urugan Pasir Alas 5 cm Pekerjaan Pondasi Batu Gunung 1: 4 Pekerjaan Pas. Batu Bata 1:4 Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pengecetan Pekerjaan Pas. Batu Alam Andesit 20x40 Pasangan Alcovan + Rangka Siku 4.4 Urugan Kembali Sloef 15x15 Kolom 15x15 Ringbalk 10x15 Pekerjaan Rangka Pipa Besi 1,5 (Aksesoris ) Pas. Stiker Nawa Cita Pas. Stiker Butir Pancasila

m3 m3 m3 m2 m2 m2 m2 m2 m2 m3 m1 m1 m1 m2 m2 m2

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

66.150 152.460 841.339 109.506 56.864 25.305 32.183 359.006 516.338 48.300 58.098 46.311 58.098 102.018 300.000 300.000

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

36.548 8.423 357.569 328.517 375.302 167.013 212.405 1.050.091 1.652.280 6.671 87.148 185.244 87.148 1.275.225 1.026.000 1.008.000 7.863.583 15.727.167

Rp Rp Rp Rp Rp Rp Rp Rp

12.502 4.802 413.931 32.412 14.424 18.344 381.670 1.044.706

Rp Rp

1.922.792 23.073.503

Rp Rp

2.500.000 2.500.000

0,55 0,06 0,43 3,00 6,60 6,60 6,60 2,93 3,20 0,14 1,50 4,00 1,50 12,50 3,42 3,36

TOTAL UNIT TOTAL

2 C.3 C.3.1 C.3.2 C.3.3 C.3.4 C.3.5 C.3.6 C.3.7 C.3.8

Pekerjaan Bangku Taman Galian Pondasi Batu Bata Urugan Pasir Alas 5 cm Pekerjaan Pas. Batu Bata 1:4 Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pengecetan Pasangan Kayu 5 / 10 Kls 1 Pekerjaan Pas. Batu Alam Andesit 20x40

0,19 0,03 3,78 0,57 0,57 0,57 0,06 2,91

m3 m3 m2 m2 m2 m2 m3 m2

Rp Rp Rp Rp Rp Rp Rp Rp

TOTAL UNIT TOTAL

12 D D.1

PEKERJAAN AKHIR Pekerjaan Pembersihan Sisa Pekerjaan

1,00

Ls

66.150 152.460 109.506 56.864 25.305 32.183 6.361.163 359.006

Rp

2.500.000 TOTAL

ANALISA ARSITEKTUR Ars - 02 1 M3 Timbunan Tanah Kembali (PERMEN PU 28/PRT/M/2016) OH 0,500 Pekerja OH 0,050 Mandor (Over head + profit 5 %)

@ @ @

Rp Rp Rp

80.000,00 120.000,00 2.300,00

= = =

Jumlah Ars - 08 1 M2 Memasang dinding bata merah tebal ½ bata, campuran spesi 1 PC : 5 PP (PERMEN PU 28/PRT/M/2016) Bahan 70,00 Buah Bata merah 700,00 = @ Rp 9,68 kg PC 1.200,00 = @ Rp 0,045 m3 PP 175.000,00 = @ Rp Tenaga kerja 0,30 OH Pekerja 80.000,00 = @ Rp 0,10 OH Tukang batu 90.000,00 = @ Rp 0,01 OH Kepala tukang 100.000,00 = @ Rp 0,02 OH Mandor Rp 120.000,00 = @ (Over head + profit 5 %) 5.214,55 = @ Rp Jumlah total Ars - 12 1 M2 Memasang plesteran 1 PC : 3 PP, tebal 15 mm (PERMEN PU 28/PRT/M/2016) Bahan 7,776 Kg PC @ Rp 0,023 M3 PP @ Rp Tenaga kerja 0,300 OH Pekerja @ Rp 0,150 OH Tukang batu @ Rp 0,015 OH Kepala tukang @ Rp 0,015 OH Mandor @ Rp (Over head + profit 5 %) @ Rp

Rp Rp Rp Rp

40.000,00 6.000,00 2.300,00 48.300,00

Rp Rp Rp

49.000,00 11.616,00 7.875,00

Rp Rp Rp Rp Rp Rp Rp

24.000,00 9.000,00 1.000,00 1.800,00 5.214,55 109.505,55 109.505,55

1.200,00 175.000,00

= =

Rp Rp

9.331,20 4.025,00

80.000,00 90.000,00 100.000,00 120.000,00 2.707,81

= = = = =

Rp Rp Rp Rp Rp Rp

24.000,00 13.500,00 1.500,00 1.800,00 2.707,81 56.864,01

50.000,00

=

Rp

2.500,00

80.000,00 90.000,00 100.000,00 120.000,00 1.205,00 Jumlah total analisa pekerjaan pengecetan Ars -16 1 m2 pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) (PERMEN PU 28/PRT/M/2016) Bahan 0,10 Kg Plamir 15.000,00 @ Rp 0,10 Kg Cat dasar 25.000,00 @ Rp 0,26 Kg Cat penutup 2 x 70.000,00 @ Rp 0,01 bh Rool Cat Tembok 25.000,00 @ Rp Jumlah I

= = = = = =

Rp Rp Rp Rp Rp Rp

16.000,00 4.500,00 500,00 600,00 1.205,00 25.305,00

= = = = =

Rp Rp Rp Rp Rp

1.500,00 2.500,00 18.200,00 250,00 22.450,00

Jumlah total Ars - 15 1 M2 Acian semen instan (ANALISA LAPANGAN) Bahan 0,050

sak

Drymix perekat bata ringan Ex.MU-200 Setara @ 40 kg

Tenaga kerja 0,200 OH Pekerja 0,050 OH Tukang batu 0,005 OH Kepala tukang 0,005 OH Mandor (Over head + profit 5 %)

@

@ @ @ @ @

Rp

Rp Rp Rp Rp Rp

Tenaga 0,02 0,063 0,0063 0,003

Oh Oh Oh Oh

Pekerja Tukang cat Kepala Tukang Mandor

(Over head + profit 5 %) Ars - 23 Pasang Batu Alam Andesit per m2 (PERMEN PU 28/PRT/M/2016) Bahan : 1,10 M2 Batu Alam 0,19 zak Semen 0,02 m3 pasir 1,50 kg Semen warna Tenaga kerja 0,10 OH 0,60 OH 0,05 OH 0,03 OH

Tukang Pekerja Kepala Tukang Mandor

(Over head + profit 5 %)

80.000,00 90.000,00 100.000,00 120.000,00 Jumlah II Rp 1.532,50 Jumlah rekap

= = = = = = =

Rp Rp Rp Rp Rp Rp Rp

1.600,00 5.670,00 630,00 300,00 8.200,00 1.532,50 32.182,50

@ @ @ @

Rp Rp Rp Rp

200.000,00 60.000,00 175.000,00 25.000,00 Jumlah I

= = = =

Rp Rp Rp Rp Rp

220.000,00 11.160,00 3.150,00 37.500,00 271.810,00

@ @ @ @

Rp Rp Rp Rp

80.000,00 90.000,00 100.000,00 120.000,00 Jumlah II Rp 17.095,50 Jumlah I + Jumlah II

= = = =

Rp Rp Rp Rp Rp Rp Rp

8.000,00 54.000,00 4.500,00 3.600,00 70.100,00 17.095,50 359.005,50

@ @ @ @ @

@

Rp Rp Rp Rp

=

Ars - 32 1 m2 ACP (Aluminum Composit Panel) Bahan 2 1,05 m2 Aluminium Composte Panel @ 20,00 bh Sekrup @ 0,27 tube sealant @ Tenaga kerja 1,25 Org/Hr Pekerja @ 0,63 Org/Hr Tukang khusus aluminium @ 0,50 Org/Hr Kepala tukang @ 0,10 Org/Hr Mandor @ (Over head + profit 5 %)

Rp Rp Rp

200.000,00 2.500,00 50.000,00

= = =

Rp Rp Rp

210.000,00 50.000,00 13.500,00

Rp Rp Rp Rp Rp

80.000,00 90.000,00 100.000,00 120.000,00 24.587,50

= = = = =

Rp Rp Rp Rp Rp Rp

100.000,00 56.250,00 50.000,00 12.000,00 24.587,50 516.337,50

Ars - 49 1 M3 Pasang Kayu Kls 1 (PERMEN PU 28/PRT/M/2016) Bahan Balok kayu 1,10 M3 Paku 10 cm 1,25 Kg Lem kayu 1,00 Kg

@ @ @

Rp Rp Rp

3.000.000,00 25.000,00 25.000,00

= = =

Rp Rp Rp

3.300.000,00 31.250,00 25.000,00

@ @ @ @ @

Rp Rp Rp Rp Rp

80.000,00 90.000,00 100.000,00 120.000,00 302.912,50 Jumlah

= = = = =

Rp Rp Rp Rp Rp Rp

560.000,00 1.890.000,00 210.000,00 42.000,00 302.912,50 6.361.162,50

Tenaga kerja Pekerja 7,00 OH Tukang Kayu 21,00 OH Kepala tukang 2,10 OH Mandor 0,35 OH (Over head + profit 5 %)

=

STR - 01 1m3 Menggali tanah biasa sedalam 1 meter (PERMEN PU 28/PRT/M/2016) Tenaga kerja 0,75 OH Pekerja 0,025 OH Mandor (Over head + profit 5%)

@ @ @

Rp Rp Rp

80.000,00 120.000,00 3.150,00 jumlah tot

STR - 06 1 m3 Mengurug pasir urug (PERMEN PU 28/PRT/M/2016) Bahan 1,2 m3 Pasir Urug Tenaga kerja 0,3 OH Pekerja 0,01 OH Mandor (Over head + profit 5%) STR - 13

= = = =

Rp Rp Rp Rp

60.000,00 3.000,00 3.150,00 66.150,00

@

Rp

100.000,00

=

Rp

120.000,00

@ @

Rp Rp Rp

80.000,00 120.000,00 7.260,00

= = =

Rp Rp Rp Rp

24.000,00 1.200,00 7.260,00 152.460,00

= =

Rp Rp

126.000,00 2.550,00

= = = = =

Rp Rp Rp Rp Rp Rp Rp

5.600,00 6.300,00 700,00 480,00 7.081,50 148.711,50 14.871,15

= =

Rp Rp

126.000,00 2.550,00

= = = = =

Rp Rp Rp Rp Rp Rp Rp

5.600,00 6.300,00 700,00 480,00 7.081,50 148.711,50 14.871,15

= = = = =

Rp Rp Rp Rp Rp

40.000,00 7.500,00 1.500,00 49.000,00 24.500,00

= = = = = = =

Rp Rp Rp Rp Rp Rp Rp

41.600,00 23.400,00 2.600,00 3.120,00 70.720,00 4.761,00 99.981,00

@

jumlah tot 10,000 Kg Pembesian dengan besi polos atau besi ulir D 16 (PERMEN PU 28/PRT/M/2016) Bahan 10,5 kg Besi beton Ulir D 16 @ Rp 12.000,00 0,15 kg Kawat beton @ Rp 17.000,00 Tenaga kerja 0,07 OH Pekerja @ Rp 80.000,00 0,07 OH Tukang besi @ Rp 90.000,00 0,007 OH Kepala tukang @ Rp 100.000,00 0,004 OH Mandor @ Rp 120.000,00 (Over head + profit 5%) 7.081,50 @ Rp jumlah tot 1 kg pembesian

10,000 Kg Pembesian dengan besi polos atau besi ulir D 22 (PERMEN PU 28/PRT/M/2016) Bahan 10,5 kg Besi beton Ulir D 22 @ Rp 12.000,00 0,15 kg Kawat beton @ Rp 17.000,00 Tenaga kerja 0,07 OH Pekerja @ Rp 80.000,00 0,07 OH Tukang besi @ Rp 90.000,00 0,007 OH Kepala tukang @ Rp 100.000,00 0,004 OH Mandor @ Rp 120.000,00 (Over head + profit 5%) 7.081,50 @ Rp jumlah tot 1 kg pembesian STR - 19 1,000 M2 Memasang bekisting untuk pondasi (PERMEN PU 28/PRT/M/2016) Bahan 0,04 m3 Kayu kelas III @ Rp 1.000.000,00 0,3 kg Paku 5 cm – 10 cm @ Rp 25.000,00 0,1 Liter Minyak bekisting @ Rp 15.000,00 STR - 15

Bahan 2x pakai Tenaga kerja 0,52 OH 0,26 OH 0,026 OH 0,026 OH

Pekerja Tukang kayu Kepala tukang Mandor

@ @ @ @

(Over head + profit 5%)

@

Rp Rp Rp Rp upah Rp

80.000,00 90.000,00 100.000,00 120.000,00 4.761,00

jumlah tot

Page 6

analisa struktur

STR - 26

1,000 (PERMEN PU bahan : 326 760 1029 215 Upah : 1,65 0,275 0,028

m3 Membuat beton mutu f’c = 26,4 MPa (K 175), slump (12 ± 2) cm, w/c = 0,52 28/PRT/M/2016) Kg Kg Kg Ltr

PC PB KR (maksimum 30 mm) Air

@ @ @ @

Rp Rp Rp Rp

1.200,00 125,00 166,67 5,00

= = = =

Rp Rp Rp Rp

391.200,00 95.000,00 171.500,00 1.075,00

Oh Oh

Pekerja Mandor Tukang Batu

@ @

Rp Rp

80.000,00 120.000,00

= =

Rp Rp

132.000,00 33.000,00

@

Rp

90.000,00

=

Rp

2.520,00

@

Rp Rp

100.000,00 41.729,75

Rp Rp

8.300,00 41.729,75

Oh 0,083 Oh Kepala Tukang (Over head + profit 5%) STR - 27

= = @ = jumlah tot Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm,

1,000 m3 (PERMEN PU 28/PRT/M/2016) bahan : 371 kg PC 698 kg PB 1047 kg KR (maksimum 30 mm) 215 Liter Air Upah : 1,65 OH Pekerja 0,275 OH Tukang batu 0,028 OH Kepala tukang 0,083 OH Mandor (Over head + profit 5%)

Rp 876.324,75 w/c = 0,58

@ @

Rp Rp Rp Rp

1.200,00 125,00 166,67 5,00

= = = =

Rp Rp Rp Rp

445.200,00 87.250,00 174.500,00 1.075,00

@ @ @

Rp Rp Rp Rp Rp

80.000,00 90.000,00 100.000,00 120.000,00 43.876,75

= = = = =

Rp Rp Rp Rp Rp Rp

132.000,00 24.750,00 2.800,00 9.960,00 43.876,75 921.411,75

= = =

Rp Rp Rp

270.000,00 242.400,00 84.875,00

= = = = =

Rp Rp Rp Rp Rp Rp

120.000,00 67.500,00 7.500,00 9.000,00 40.063,75 841.338,75

= = = = = = = =

Rp Rp Rp Rp Rp Rp Rp Rp

2.000,00 250,00 3.000,00 4.923,45 7.650,00 4.800,00 0,75 1,50

= = = = = = =

Rp Rp Rp Rp Rp Rp Rp Rp

14.400,00 1.800,00 1.800,00 1.800,00 600,00 1.080,00 2.205,29 46.310,99

@

jumlah tot 1,000 M3 Memasang pondasi batu belah, campuran 1 PC : 3 PP (PERMEN PU 28/PRT/M/2016) Bahan 1,2 M3 Batu belah 15 cm/20 cm @ Rp 225.000,00 202 Kg PC @ Rp 1.200,00 0,485 M3 PP @ Rp 175.000,00 Tenaga kerja 1,5 OH Pekerja @ Rp 80.000,00 0,75 OH Tukang batu @ Rp 90.000,00 0,075 OH Kepala tukang @ Rp 100.000,00 0,075 OH Mandor @ Rp 120.000,00 (Over head + profit 5%) 40.063,75 @ Rp jumlah tot STR - 32 1 M' Membuat kolom praktis beton bertulang (11 x 11) cm (PERMEN PU 28/PRT/M/2016) Bahan 0,002 m3 Kayu kelas III @ Rp 1.000.000,00 0,01 kg Paku 5 cm – 12 cm @ Rp 25.000,00 0,2 Liter Minyak bekisting @ Rp 15.000,00 3 kg Besi beton polos @ Rp 1.641,15 0,45 kg Kawat beton @ Rp 17.000,00 4,00 kg PC @ Rp 1.200,00 0,006 m3 PB @ Rp 125,00 0,009 m3 KR @ Rp 166,67 Tenaga kerja 0,18 OH Pekerja @ Rp 80.000,00 0,02 OH Tukang batu @ Rp 90.000,00 0,02 OH Tukang kayu @ Rp 90.000,00 0,02 OH Tukang besi @ Rp 90.000,00 0,006 OH Kepala tukang @ Rp 100.000,00 0,009 OH Mandor @ Rp 120.000,00 (Over head + profit 5%) 2.205,29 @ Rp STR - 30

jumlah tot

Page 7

analisa struktur

STR - 33

1 M' Membuat ring balok beton bertulang (10 x 15) cm (PERMEN PU 28/PRT/M/2016) Bahan 0,003 m3 Kayu kelas III @ Rp 1.000.000,00 0,02 kg Paku 5 cm – 12 cm @ Rp 25.000,00 0,200 Liter Minyak bekisting @ Rp 15.000,00 3,600 kg Besi beton polos @ Rp 1.641,15 0,05 kg Kawat beton @ Rp 17.000,00 5,500 Kg PC @ Rp 1.200,00 0,009 m3 PB @ Rp 125,00 0,015 m3 KR @ Rp 166,67 Tenaga kerja 0,297 OH Pekerja @ Rp 80.000,00 0,033 OH Tukang batu @ Rp 90.000,00 0,033 OH Tukang kayu @ Rp 90.000,00 0,033 OH Tukang besi @ Rp 90.000,00 0,01 OH Kepala tukang @ Rp 100.000,00 0,015 OH Mandor @ Rp 120.000,00 (Over head + profit 5%) 2.766,59 @ Rp jumlah tot

Page 8

= = = = = = = =

Rp Rp Rp Rp Rp Rp Rp Rp

3.000,00 500,00 3.000,00 5.908,14 850,00 6.600,00 1,13 2,50

= = = = = = =

Rp Rp Rp Rp Rp Rp Rp Rp

23.760,00 2.970,00 2.970,00 2.970,00 1.000,00 1.800,00 2.766,59 58.098,35

analisa struktur

ME-01

Memasang 1 m' pipa PVC tipe AW Ø 6" (PERMEN PU 11/PRT/M/2013) Bahan 1 M 1,20 Pipa PVC Ø 6" 0,35Harga pipaPerlengkapan

Tenaga 0,08 0,14 0,01 0,00

Oh Oh Oh Oh

Pekerja Tukang batu Kepala Tukang Mandor

(Over head + profit 5 %)

ME-02

Memasang 1 m' pipa PVC tipe AW Ø 5" (PERMEN PU 11/PRT/M/2013) Bahan 1 M 1,20 Pipa PVC Ø 5" 0,35Harga pipaPerlengkapan

Tenaga 0,08 0,14 0,01 0,00

Oh Oh Oh Oh

Pekerja Tukang batu Kepala Tukang Mandor

(Over head + profit 5 %)

ME-03

Memasang 1 m' pipa PVC tipe AW Ø 4" (PERMEN PU 11/PRT/M/2013) Bahan M1 1,20 Pipa PVC Ø 4" 0,35Harga pipaPerlengkapan

Tenaga 0,08 0,14 0,01 0,00

Oh Oh Oh Oh

Pekerja Tukang batu Kepala Tukang Mandor

(Over head + profit 5 %)

ME - 04 Memasang 1 m' pipa PVC tipe AW Ø 3" (PERMEN PU 11/PRT/M/2013) Bahan M1 1,20 Pipa PVC Ø 3" Harga 0,35 pipa Perlengkapan Tenaga 0,08 0,14 0,01 0,00

Oh Oh Oh Oh

Pekerja Tukang batu Kepala Tukang Mandor

(Over head + profit 5 %)

@ @

Rp Rp

Jumlah I

= = =

Rp Rp Rp

@ @ @ @

Rp Rp Rp Rp

80.000,00 90.000,00 100.000,00 120.000,00 Jumlah II 1.023,60 @ Rp Jumlah I + Jumlah II

= = = = = =

Rp Rp Rp Rp Rp Rp Rp

Jumlah I

= = =

Rp Rp Rp

80.000,00 90.000,00 100.000,00 120.000,00 Jumlah II 1.023,60 @ Rp Jumlah I + Jumlah II

= = = = = =

Rp Rp Rp Rp Rp Rp Rp

Jumlah I

= = =

Rp Rp Rp

80.000,00 90.000,00 100.000,00 120.000,00 Jumlah II Rp 1.023,60 @ Jumlah I + Jumlah II

= = = = = =

Rp Rp Rp Rp Rp Rp Rp

=

Rp

-

Jumlah I

= =

Rp Rp

-

80.000,00 90.000,00 100.000,00 120.000,00 Jumlah II 1.023,60 @ Rp Jumlah I + Jumlah II

= = = =

Rp Rp Rp Rp Rp Rp Rp

@ @

Rp Rp

@ @ @ @

Rp Rp Rp Rp

@ @

Rp Rp

@ @ @ @

Rp Rp Rp Rp

@

Rp

@

Rp

@ @ @ @

Rp Rp Rp Rp

-

= =

-

6.480,00 12.150,00 1.350,00 492,00 20.472,00 1.023,60 21.495,60

-

6.480,00 12.150,00 1.350,00 492,00 20.472,00 1.023,60 21.495,60

-

6.480,00 12.150,00 1.350,00 492,00 20.472,00 1.023,60 21.495,60

6.480,00 12.150,00 1.350,00 492,00 20.472,00 1.023,60 21.495,60

ME - 05 Memasang 1 m' pipa PVC diameter 1" (PERMEN PU 11/PRT/M/2013) Bahan 1,20 M' Pipa PVC Ø 1" harga 0,25 pipa Perlengkapan Tenaga 0,08 0,14 0,01 0,00 (Over head

Oh Pekerja Oh Tukang batu Oh Kepala tukang Oh Mandor + profit 5 %)

ME - 06 Memasang 1 m' pipa PVC diameter 1 1/2" (PERMEN PU 11/PRT/M/2013) Bahan 1,20 M' Pipa PVC Ø 1 1/2" harga 0,25 pipa Perlengkapan Tenaga 0,08 0,14 0,01 0,00 (Over head

Oh Pekerja Oh Tukang batu Oh Kepala tukang Oh Mandor + profit 5 %)

ME - 07 Memasang 1 m' pipa PVC diameter 2" (PERMEN PU 11/PRT/M/2013) Bahan 1,20 M' Pipa PVC Ø 2" harga 0,25 pipa Perlengkapan Tenaga 0,08 Oh Pekerja 0,14 Oh Tukang batu 0,01 Oh Kepala tukang 0,00 Oh Mandor (Over head + profit 5 %)

ME - 08 Memasang 1 m' pipa PVC diameter 1/2" (PERMEN PU 11/PRT/M/2013) Bahan 1,20 M' Pipa PVC 1/2" harga 0,35 pipa Perlengkapan Tenaga 0,08 Oh Pekerja 0,06 Oh Tukang batu 0,006 Oh Kepala tukang 0,002 Oh Mandor (Over head + profit 5 %)

ME - 09 Memasang 1 m' pipa PVC diameter 3/4" (PERMEN PU 11/PRT/M/2013) Bahan 1,20 M' Pipa PVC 3/4" harga 0,25 pipa Perlengkapan Tenaga 0,08 Oh Pekerja 0,14 Oh Tukang batu

@

Rp

-

=

Rp

-

@

Rp

-

=

Rp

-

@ @ @ @

Rp 80.000,00 Rp 90.000,00 Rp 100.000,00 Rp 120.000,00 Rp 1.023,60 Jumlah total

= = = = =

Rp Rp Rp Rp Rp Rp

@

Rp

-

=

Rp

-

@

Rp

-

=

Rp

-

@ @ @ @

Rp 80.000,00 Rp 90.000,00 Rp 100.000,00 Rp 120.000,00 Rp 1.023,60 Jumlah total

= = = = =

Rp Rp Rp Rp Rp Rp

@

Rp

-

=

Rp

-

@

Rp

-

=

Rp

-

@ @ @ @

Rp 80.000,00 Rp 90.000,00 Rp 100.000,00 Rp 120.000,00 Rp 1.023,60 Jumlah total

= = = = =

Rp Rp Rp Rp Rp Rp

@

Rp

-

=

Rp

-

@

Rp

-

=

Rp

-

@ @ @ @

Rp 80.000,00 Rp 90.000,00 Rp 100.000,00 Rp 120.000,00 Rp 636,00 Jumlah total

= = = = = =

Rp Rp Rp Rp Rp Rp

@

Rp

-

=

Rp

-

@

Rp

-

=

Rp

-

@ @

Rp Rp

= =

Rp Rp

@

@

@

@

80.000,00 90.000,00

6.480,00 12.150,00 1.350,00 492,00 1.023,60 21.495,60

6.480,00 12.150,00 1.350,00 492,00 1.023,60 21.495,60

6.480,00 12.150,00 1.350,00 492,00 1.023,60 21.495,60

6.480,00 5.400,00 600,00 240,00 636,00 13.356,00

6.480,00 12.150,00

0,01 Oh Kepala tukang 0,00 Oh Mandor (Over head + profit 5 %) ME - 10 Memasang 1 m' pipa GIP diameter 15 mm (PERMEN PU 11/PRT/M/2013) Bahan 1,00 M' Pipa GIP 15 mm" Tenaga 0,35 Oh Pekerja 0,17 Oh Tukang batu 0,03 Oh Mandor (Over head + profit 5 %)

ME - 11 Memasang 1 m' pipa GIP diameter 20 mm (PERMEN PU 11/PRT/M/2013) Bahan 1,00 M' Pipa GIP 20 mm" Tenaga 0,35 Oh Pekerja 0,17 Oh Tukang batu 0,03 Oh Mandor (Over head + profit 5 %)

ME - 12 Memasang 1 m' pipa GIP diameter 25 mm (PERMEN PU 11/PRT/M/2013) Bahan 1,00 M' Pipa GIP 25 mm" Tenaga 0,35 Oh Pekerja 0,17 Oh Tukang batu 0,03 Oh Mandor (Over head + profit 5 %) ME - 14 Memasang 1 m' pipa GIP diameter 50 mm (PERMEN PU 11/PRT/M/2013) Bahan 1,00 M' Pipa GIP 50 mm" Tenaga 0,35 Oh Pekerja 0,17 Oh Tukang batu 0,03 Oh Mandor (Over head + profit 5 %) ME - 25 1 MTR PEMASANGAN PIPA 16" shc80 (Analisa Lapangan) Bahan 1,00 Meter Pipa 16" 7,8mm 1,00 Meter Pengecatan/Cooting/Assesoris Tenaga 0,50 o/hr Tukang listrik 0,05 o/hr Mandor (Over head + profit 5 %)

@ @

Rp 100.000,00 Rp 120.000,00 Rp 1.023,60 Jumlah total

= = = =

Rp Rp Rp Rp

@

Rp

=

Rp

@ @ @

Rp 80.000,00 Rp 90.000,00 Rp 120.000,00 Rp 2.358,00 Jumlah total

= = = = =

Rp Rp Rp Rp Rp

@

Rp

=

Rp

@ @ @

Rp 80.000,00 Rp 90.000,00 Rp 120.000,00 Rp 2.358,00 Jumlah total

= = = = =

Rp Rp Rp Rp Rp

27.600,00 15.480,00 4.080,00 2.358,00 49.518,00

@

Rp

50.000,00

=

Rp

50.000,00

@ @ @

Rp 80.000,00 Rp 90.000,00 Rp 120.000,00 Rp 4.858,00 Jumlah total

= = = = =

Rp Rp Rp Rp Rp

27.600,00 15.480,00 4.080,00 4.858,00 102.018,00

@

Rp

100.000,00

=

Rp

100.000,00

@ @ @

Rp 80.000,00 Rp 90.000,00 Rp 120.000,00 Rp 7.358,00 Jumlah total

= = = = =

Rp Rp Rp Rp Rp

27.600,00 15.480,00 4.080,00 7.358,00 154.518,00

@ @

Rp Rp

200.000,00 31.248,00

= =

Rp Rp

200.000,00 31.248,00

@ @

Rp 90.000,00 Rp 120.000,00 Rp 14.112,40 Jumlah total

= = = =

Rp Rp Rp Rp

45.000,00 6.000,00 14.112,40 296.360,40

@

@

@

@

@

@

-

-

1.350,00 492,00 1.023,60 21.495,60

27.600,00 15.480,00 4.080,00 2.358,00 49.518,00

-

ME - 66 1 m' Kabel Tr NYY 3 x 4 mm (Analisa Lapangan) Bahan 1,00 M' Kabel NYY 3 x 4 mm Tenaga 0,01 Hr Mandor 0,02 Hr Kepala Tukang listrik 0,02 Hr Tukang (Over head + profit 5 %)

@

Rp

15.000,00

=

Rp

15.000,00

@ @ @

Rp 120.000,00 Rp 100.000,00 Rp 90.000,00 Rp 1.000,00 Jumlah total

= = = =

Rp Rp Rp Rp Rp

1.200,00 2.000,00 1.800,00 1.000,00 21.000,00

=

DAFTAR HARGA BAHAN BANGUNAN DAN UPAH KERJA TAHUN ANGGARAN 2016 NO

JENIS BAHAN/ TENAGA

SATUAN

HARGA

KET

KET. HARGA

1

2

3

4

5

6

1

Batu kali Utuh/Bulat

M3

Rp

225.000,00

4

Pasir Timbunan/Gunung

M3

Rp

100.000,00

7

Pasir Pasangan

M3

Rp

175.000,00

Rp

125,00

8 10 12 14 18 19

Kerikil Air Besi D 16 Besi D 22 Semen Portland (Tonasa 50 Kg) Semen Nat/warna

M3 Ltr Kg Kg Kg Kg

Rp Rp Rp Rp Rp Rp

300.000,00 5,00 12.000,00 12.000,00 1.200,00 25.000,00

Rp

166,67

22

Drymix perekat bata ringan Ex.MU-200 Setara @ 40 kg

sak

Rp

50.000,00

23 25 27 29

Batu Merah Kawat beton Minyak bekisting Kayu kelas I Balok

Bh Kg Lt M3

Rp Rp Rp Rp

700,00 17.000,00 15.000,00 3.000.000,00

33

Kayu kelas III Bekisting

M3

Rp

1.000.000,00

M3 Kg Kg 2,5 kg bh Bh Tube Kg M Btg Btg Kg

1.000.000,00 25.000,00 25.000,00 70.000,00 25.000,00 2.500,00 50.000,00 15.000,00 15.000,00 50.000,00 100.000,00 25.000,00 200.000,00 2.500.000,00

34 39 43 44 45 73 74 76 133 266 268 307 316 345

Kayu kelas III bekisting Paku Campur Cat dasar Undercoat Tembok Cat Penutup EX Mowilex Roll Cat Tembok Paku sekrup Sealent Plamur NYY 3 x 4 mm2 Pipa GIP 25 mm Pipa GIP 50 mm Lem kayu ACP + instalasi

Rp 60.000,00

Box Panel & Accessories

Unit

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

NO. 1 3

PERALATAN Sewa Excavator Dump truck

SAT. Jam Jam

HARGA SATUAN Rp 550.000,00 Rp 100.000,00

KET.

KET. HARGA

NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14

UPAH KERJA Pekerja Tukang Kayu Tukang Batu Tukang Cat Tukang Listrik Tukang Pipa Tukang Besi Kepala Tukang Kayu Kepala Tukang Batu Kepala Tukang Listrik Kepala Tukang Cat Kepala Tukang Pipa Kepala Tukang Besi Mandor

SAT. Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari Org/Hari

HARGA SATUAN Rp 80.000,00 Rp 90.000,00 Rp 90.000,00 Rp 90.000,00 Rp 90.000,00 Rp 90.000,00 Rp 90.000,00 Rp 100.000,00 Rp 100.000,00 Rp 100.000,00 Rp 100.000,00 Rp 100.000,00 Rp 100.000,00 Rp 120.000,00

KET.

KET. HARGA

M2

3,25

49230,76923

40000

516337,5

Related Documents

Ttess Analisa Gedung 2016
October 2019 7
Analisa
October 2019 73
Analisa
May 2020 59
2016
May 2020 26

More Documents from ""