Progress Report
Dear Respected Sir, This is to about the commissioning progress of Mains Synchronization panel, till the 03-10-2017 at 16:00 provided control cables are terminated at mains synch panel and some cables are still pending for lying that is responsibility of AMANAH Mall so kindly arrange to lying of pending cables to synch panel as soon as possible so that we can move to the next step of termination of control wires in the field and related ACBs. In this step we also required any qualified engineer (for ACBs interlocking, UVTs and internal connections) with whom co-ordination we can discus and terminate the wires in the field. Kindly nominate the related person for that purpose so we can start technical discussion with him. Here is the list of pending cables for lying 1234-
2.5 mm cable for Mains-3 Current Transformer signals 1.5mm cable for Tie breakers on/off/ and status in synch room 2.5 mm cable for tie breakers C.T signals 1.5 mm cable for bus bar P.T Kindly arrange the above cables because of these cables project being delayed .we are not responsible of any delay if cables are not arranged in time. Our engineering and commissioning team is now free and waiting for these cables
Iftikhar Ahmed Project Engineer