S10

Página :

1

Precios y cantidades de recursos requeridos por tipo Obra Subpresupuesto Fecha Lugar

0401002 001 04/06/2012

LABORATORIO DE EMERGENCIA PARA EL I.N.S.N. - ETAPA II NUEVO LABORATORIO DE EMERGENCIA PARA EL I.N.S.N. - ETAPA II

150105

LIMA - LIMA - BREÑA

Código

Recurso

0101030002 0147000022 0147010001 0147010002 0147010003 0147010004

GUARDIAN OPERADOR DE EQUIPO LIVIANO CAPATAZ OPERARIO OFICIAL PEON

Unidad

Cantidad

Precio S/.

Parcial S/.

7.86 15.43 17.15 14.29 11.62 11.33

2,829.60 1,405.34 2,739.92 21,807.77 15,215.34 7,781.51

MANO DE OBRA hh hh hh hh hh hh

360.0000 91.0787 159.7620 1,526.0862 1,309.4098 686.8059

51,779.48

MATERIALES 0201030004 0202000007 0202000008 0202010026 0203020003 0205000003 0205010004 0217000024 0217010020 0221000001 0231110001 0234000000 0239050000 0243040000 0244030028

ACEITE PARA MOTOR SAE-30 ALAMBRE NEGRO RECOCIDO # 16 ALAMBRE NEGRO RECOCIDO # 8 CLAVOS C/C PROMEDIO ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 PIEDRA CHANCADA DE 1/2" ARENA GRUESA LADRILLO KING KONG 18 HUECOS 9 X 13 X 23 cm LADRILLO DE TECHO HUECO 15x30x30cm CEMENTO PORTLAND TIPO I (42.5 kg) MADERA ANDAMIAJE GASOLINA 84 OCTANOS AGUA MADERA TORNILLO TRIPLAY DE 4 X 8 X 19 mm

gal kg kg kg kg m3 m3 u u bls p2 gal m3 p2 pl

0.0721 943.7862 230.7844 208.6320 12,693.7173 85.4518 57.0263 7,394.0400 2,950.5000 983.3646 41.3655 2.1624 21.4717 4,770.7667 14.7124

42.00 4.50 4.50 4.50 3.75 45.00 40.00 0.60 1.90 15.50 4.50 13.00 9.00 4.50 90.00

3.03 4,247.04 1,038.53 938.84 47,601.44 3,845.33 2,281.05 4,436.42 5,605.95 15,242.15 186.14 28.11 193.25 21,468.45 1,324.12 108,439.85

EQUIPOS 0337010001 0349070004 0349100007 0349180024

HERRAMIENTAS MANUALES VIBRADOR DE CONCRETO 4 HP 2.40" MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 WINCHE DE DOS BALDES DE 350 kg MOTOR ELECTRICO 3.6 HP

%MO hm hm hm

35.3265 35.3262 29.5185

20.00 30.00 26.40

1,868.41 706.53 1,059.79 779.29 4,414.02

Total

S/.

164,633.35

Related Documents


More Documents from ""

Se Acerca La Web 3
October 2019 29
Datos Curiosos.docx
June 2020 13
Formacion Del Profesorado
October 2019 37
Mercadillo9
November 2019 27