20080630 4p Kuma Bio Xpress

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 20080630 4p Kuma Bio Xpress as PDF for free.

More details

  • Words: 1,670
  • Pages: 4
Bio-Xpress

Decentralised Systems

Bio-Xpress—Accelerated Aerobic Action How they work Bio-Xpress Reactors operate on a continuous aerobic digestion principle. In essence, this mimics nature with all important improvements in speed, space and safety.

Integrated Control Station

Special points of interest:

Raw sewage is passed to the multistage Bio-Xpress Reactor after it has been screened for non biodegradable waste. The Bio-Xpress Reactor continually aerates and processes the sewage until it is separated into Recycled Water and valuable Biosludge.

High performance, maintenance free dual purpose Bio-Xpress micro media with 20 year guarantee.

A typical complete installation is described on page 3 along with two example illustrations of Bio-Xpress Decentralised Wastewater Stations. A more complete description can be found at:



Ready to reclaim water within hours of delivery.



A complete solution: 2 Phase Bio-Xpress Sewer Mining Stations, can recycle waste back to pure, potable water.

In a Bio-Xpress Decentralised Wastewater Station, all equipment is installed above ground and housed typically in an unobtrusive building designed to be in harmony with its surrounding environment. This means that there is simply no opportunity for untreated effluent to enter the environment and water table, and Kuma Sewer Mining Stations will not impact negatively on the community.



Highest quality construction, built to provide greater than 20 years continuous operation.

















Lowest Total Cost of Operation of any comparable comprehensive sewage treatment system. No consumables in primary stage, no service breaks whatsoever. Electricity and sewage IN High quality Biosludge and Recycled and/or potable water OUT.

http://bio-xpress.blogspot.com

Typical Installation Scenarios Bio-Xpress Reactor systems are especially suited for: Office buildings

Cluster Housing projects

Parks

Resorts

Sports arenas

RV areas

Indigenous housing communities

Race tracks

Airports

Schools

Island communities

Retirement villages

Sanatoriums

Hospitals

Remote rural communities

Aged Care homes

Residential areas

Spas

Shopping malls

Industrial estates

Apartment buildings

Golf Clubs

Factories

Campgrounds

Gas stations

Marinas

Bus depots

Condominiums Mining sites Hotels Military camps Gated communities

Fully upgradeable as needs increase.

Refugee Camps

9 models for all sizes of projects for 300 to more than 1800 people.

Prisons

Bio-Xpress Reactors can be installed in multiples to accommodate upgrades and larger communities. Safety ++: no long distance pumping to remote sewage farms with the danger of pipe/pump failure.

Caravan Parks Stadiums

Recreational areas

Bio-Xpress Reactors can be retrofitted to existing buildings or provide a comprehensive solution for water saving and recycling in Green Building projects.

Installations have minimal space requirement and environmental impact in terms of noise, odour and power consumption.

http://bio-xpress.blogspot.com

Reactor model specifications PERFORMANCE PER 24 HOURS Model

300

500 700

850

Litres treated

73,000

101,000

147,000

174,000

211,000

248,000

284,000

330,000

360,000

367

504

734

871

1055

1238

1422

1651

1800

Max power daily

100

110

120

132

150

160

180

200

210

Av. duty cycle

60

66

72

80

90

96

108

120

126

Bio-Xpress Media installed — Kg

1500

2100

3000

3600

4400

5100

5900

6800

7400

Length — Metres

2.44

3.66

4.88

5.87

7.32

8.53

9.75

10.97

11.96

Width

2.39

2.39

2.39

2.39

2.39

2.39

2.39

2.39

2.39

Height

2.24

2.24

2.24

2.24

2.24

2.24

2.24

2.24

2.24

Shipping weight — Kg

1286

2143

3000

3643

4500

5357

6214

6857

7714

Operational weight

11000

16000

21000

26000

32000

38000

43000

48000

53000

Average number of persons served

1050 1250 1450 1600

1800

based on: 200 Phase 1 Bio-Reactor

litres/person/day

( kW hrs.)

Recycled water fit for re-use

About our manufacturing standards 2nd Phase potable water

Bio-Xpress reactors are manufactured in Thailand by Kuma with the highest quality components and raw materials. Only ISO standard components and fittings from the USA are used along with International Standards based high grade steel to ensure every Bio-Xpress Reactor will provide at least a full 20 years operational lifetime. Welding is completed to the highest level and exceeds all international and military standards. After fabrication is completed, the entire unit is sandblasted back to white metal before precision coating with a coal tar based epoxy resin. There are 9 standard sizes ranging from 2.5 metres in length for an average of 300+ persons to 12 metres length catering for over 1800. Our factory is open for inspection by appointment to all government officials, environmental delegations, community organisations and current and prospective customers.

Rapid shipment

Orders are completed under firm contract with agreed delivery times and costs.

Rapid shipment worldwide in 20’ & 40’ ISO containers All Kuma Bio-Xpress Reactors and ancillary systems have been designed to fit and be readily packed in standard ISO shipping containers. This means complete systems can be delivered worldwide to your location and be fully operational in a matter of hours from their arrival on-site. New Thailand — Laos Friendship Bridge across the Mekong at; Muhkdahan/Savanakeht opened 2006 A vital link in the new ASEAN Trans-Asia Highway

When the requirement to upgrade or downsize a Station arises, Kuma Bio-Xpress systems can be quickly de-commissioned, sanitised and packed for removal and use elsewhere. This deployment flexibility ensures the fastest time to service and minimises operational and capital cost and space requirements. Northern Thailand offers one of the most central world delivery centres with excellent road freight from our factory to ports in Bangkok and, with the completion of the new ASEAN Trans Asia Highway, providing an east west-coast to coast road, we will further speed delivery to Asia, The Middle East, Europe and the American continents.

http://bio-xpress.blogspot.com

Bio-Xpress Decentralised systems 1st Phase Bio-Xpress Wastewater Station — serving 700 persons



Buffer tank to balance shock loading



non-biodegradable waste automatically loaded in eco friendly, transportable disposal containers



Biosludge outlet



Low BOD Recycled Water for gardens, car washing, toilet flushing and general building exterior cleansing

What is the role of the buffer tank? The role of the buffer tank in a Bio-Xpress Sewer Mining Station is two fold. Firstly it is the place where non-biodegradable objects that find there way into the system are screened out for instant incineration or returned via appropriate containers as approved landfill. The secondary role is to ensure that the sewage received will never overflow the 1st Phase treatment system. By designing the capacities to adequately cope for the community being served, any chance of sewage overflow is eliminated.

2 Phase Bio-Xpress Sewer Mining Station — serving 2000 persons



On site staff amenities if required



Optional power backup or self contained primary power source



Destruction of nonbiodegradable waste in a high energy incinerator



Biosludge pathogen removal, pelletising, packing and storage station (in development)



Recycled Water for Sports Grounds, parks, gardens, car washing, toilet flushing and general exterior cleansing



Optional Class A potable water processing in a 2nd Phase membrane technology, UV and Ozone treatment system

http://bio-xpress.blogspot.com

Bio-Xpress Treating Industrial and hazardous waste water •

Food industry



Paper and pulp



Petro-chemical



Pharmaceutical



Beverage industry



Meat packing



Fish farming



Slaughter houses



Land fills



Packaging



Sugar Cane Processing

Bio-Xpress Reactors can be fitted with additional dousing, screening and flocculation systems in the primary stages for the removal of heavy metals, chemicals, detergents, pharmaceuticals and other contaminants when catering for industrial and hazardous waste water.

Decentralised Systems

How safe is low BOD Recycled Water? Biochemical Oxygen Demand is the primary measure and performance yardstick of water safety for humans. With a BOD of less than 8 mg/L, the accelerated treatment provided by the innovative multi -stage Bio-Xpress Reactor ensures the lowest BOD of any primary (1st Phase) sewage treatment system. This extremely low BOD ensures you and your family's health for responsible Recycled Water re-use, and very importantly, saves costly membrane consumables and lowers maintenance when going on to 2nd Phase treatment for the return to Class A potable water.

Reclaiming for your choice of water re-use By keeping the Class A water treatment as a separate 2nd Phase, Bio-Xpress clients and operators are able to decide how much of the treated Recycled Water is set aside for Class A potable water production. This means in those times when water is in abundance, primary treated, very low BOD Recycled Water can be mined and recycled. With Bio-Xpress Sewer Mining Stations you have the flexibility to ensure you are always operating for the minimum cost and the maximum effectiveness, irrespective of water availability or demand.

About our Bio-Media The Bio-Xpress Micro-Media provides a lifetime of operation and eliminates the need for consumables in the primary treatment Phase. The micro construction ensures the maximum surface area to house the bacteria. The serrated external surface provide a highly effective series of cutting edges to speed the break-down of suspended solids and ensure the minimum cycle time from sewage to low BOD Recycled Water.

Total Cost of Operation When we quote for the installation of a Bio-Xpress Sewer Mining station you will be provided with a Total Cost of Operation financial plan that spells out in fine detail every aspect of both the capital and on-going expenses. With this useful tool, you are provided with a yardstick that ensures all your competitive quotes are providing the maximum comparative financial detail. Call us any time for an obligation free TCO for your project.

Minimising on-going maintenance and consumables

call us: Kuma can provide solutions for any water treatment situation, especially where portability or immediate “in service” is needed. These solutions are delivered with the industry’s most competitive TCO.

Bio-Xpress Sewer Mining Stations can be designed with 2nd Phase treatment facilities. This means that the bulk of the treatment task (1st Phase) is handled by the Primary Bio-Xpress Reactor equipped with Kuma Micro Bio-Media with no need whatever for consumables. The optional 2nd Phase water purification system takes the low BOD Recycled Water from the Bio-Xpress Reactor and returns it to Class A potable water as required using reverse osmosis and membrane technology coupled with proven UV and Ozone sterilisation.

Australia: Kuma Group Pty Ltd 18 Emily Street Seymour Victoria 3660 Australia

Total Cost of Operation report

Melbourne: Email:

Website:

04 11 22 3336 [email protected]

http://bio-xpress.blogspot.com

Related Documents

20080630 4p Kuma Bio Xpress
November 2019 0
Xpress Bro
December 2019 5
Beynd 4p
June 2020 19
Feverbach 4p
June 2020 21
04-01-09-kuma
June 2020 8
20080630 Fn Adesso Basta
October 2019 20