CONTRACTUAL

CORTE DE MANO DE OBRA ETAPA 1

CONTRATO No. CPJ-0011001-01-17 OBJETO:

SAO

001 001 001 001 001 001 001 001 001 001 001 001 001 001 001 001 001 001 001 001 001 001 001 001 001

13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 39 35 13

68838 69191 68480 68835 69192 68357 68866 60009 60242 60052 16422 62165 62193 68474 68473 68473 61020 61010 68855 68860 60074 60023 62098 68871 67781

25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25

DESDE

FECHA INICIO

08.Aug.17

08.Feb.17

HASTA

FECHA TERMIN

07.Nov.17

03.Aug.17

EXPEDICION

OTRO SI PLAZO

30

C.C/NIT: 900,835,892-1 CONTRATADO

ACTIVIDAD IT

08.Aug.17

Retiro de malla eslabonada de h=2.00m Retiro de poste cerramiento Retiro de puertareja metalica de 1.0 2.0m Instalación de malla eslabonada Instalación de poste cerramiento Instalacion de puertareja metalica de 1.0 - 2.0 m Excavación de pila de 0-2 m..D= 0.60 m Acarreo de tierra de pila Vaciado de pila maciza de D= 0.60 m Preparación concreto Acarreo concreto Construcción de Campamento provisional Vaciado de piso en mortero Demolición piso Demolición muro en ladrillo Demolición muro en bloque Hora oficial Hora Ayudante Vaciado de viga aerea Vaciado de losa aerea Excavación de 0-2 m Lleno compactado Rocería Cuneta vaciada de 30 cms de ancho Pega de ladrillo de 10

PAZ Y SALVO ALMACEN ASEO Y SEGURIDAD

OTRO SI PLAZO

OBRA: ARBOLEDA DE SAN ANTONIO ETAPA 1

COD.

CA SB

91

M de O en adecuación de provisionales, contrucción campamento y obras complementarias provisionales para la obra Arboleda de San Antonio.

CONTRATISTA: MHF SERVICIOS DE CONSTRUCCIÓN S.A.S COD. PPTO

POLIZA No 1908751-5

PLAZO

UN

Ml Un Un Ml Un Un Ml M³ Ml M³ M³ M² M² M² M² M² Hr Hr Ml M² M³ M³ M² Ml M²

CANT

OT1 TOTAL

200 200 10 420 300 10 40 40 40 30 30 300 200 150 150 150 200 200 50 100 40 25 3,000 400 115

200 200 10 420 300 10 40 250 290 40 30 30 300 200 150 150 150 200 500 700 -50 0 -100 0 200 240 200 225 3,000 400 115

VR. UNITARIO $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

3,500 3,000 15,000 7,000 4,000 40,000 32,000 9,000 38,000 15,000 10,000 6,000 11,000 10,000 9,000 9,000 9,000 6,500 25,000 27,000 22,000 12,000 4,000 9,000 15,000

Hasta: 30.Sep.17

CORTE No. 2 (DOS) VR. PARCIAL

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

700,000 600,000 150,000 2,940,000 1,200,000 400,000 1,280,000 2,610,000 1,520,000 450,000 300,000 1,800,000 2,200,000 1,500,000 1,350,000 1,350,000 1,800,000 4,550,000 5,280,000 2,700,000 ### $ 3,600,000 $ 1,725,000

VENCIDO

Desde: 10.Sep.17

CANT

70.00 10.00 2.00 38.00 43.00 2.00 ### 15.00 15.00 ### ### 25.30 52.00 28.50 23.00 ###

### ### ### 39.00 ###

COPIA CONTROLADA Octubre 9 de 2010, REV: 1 Sistema de Gestión Integral. 04/01/2019

VR. PARCIAL 245,000.00 30,000.00 30,000.00 266,000.00 172,000.00 80,000.00 ### 225,000.00 150,000.00 661,560.00 ### 253,000.00 468,000.00 256,500.00 207,000.00 ### ### ### ### 351,000.00 ###

ACUMULADO CANT

135.00 68.00 6.00 106.00 88.00 4.00 40.00 283.32 32.50 30.00 30.00 160.26 200.00 45.30 97.00 63.50 68.00 700.00 240.00 225.00 1,477.50 39.00 109.36

VLR. PARCIAL 472,500 204,000 90,000 742,000 352,000 160,000 1,280,000 2,549,880 1,235,000 450,000 300,000 961,560 2,200,000 453,000 873,000 571,500 612,000 4,550,000 5,280,000 2,700,000 5,910,000 351,000 1,640,400

POR PAGAR CANT

65.0 132.0 4.0 314.0 212.0 6.0 0.0 6.7 7.5 0.0 0.0 139.7 0.0 104.7 53.0 86.5 132.0 0.0 0.0 0.0 0.0 0.0 1,522.5 361.0 5.6

VLR. PARCIAL 227,500 396,000 60,000 2,198,000 848,000 240,000 0 60,120 285,000 0 0 838,440 0 1,047,000 477,000 778,500 1,188,000 0 0 0 0 0 6,090,000 3,249,000 84,600

414225457.xls | Pagina 2 de 5

CONTRATO No. CPJ-0011001-01-17

OBRA: ARBOLEDA DE SAN ANTONIO ETAPA 1

M de O en adecuación de provisionales, contrucción campamento y obras complementarias provisionales para la obra Arboleda de San Antonio.

OBJETO:

CONTRATISTA: MHF SERVICIOS DE CONSTRUCCIÓN S.A.S COD. PPTO

COD.

CA SB

IT

001 25

39

Hasta: 30.Sep.17

C.C/NIT: 900,835,892-1 CONTRATADO

ACTIVIDAD

UN

SAO

CANT

OT1 TOTAL

VENCIDO

Desde: 10.Sep.17

CORTE No. 2 (DOS)

VR. UNITARIO

VR. PARCIAL

CANT

VR. PARCIAL

ACUMULADO CANT

VLR. PARCIAL

POR PAGAR CANT

VLR. PARCIAL

OTRO SI # 01 80012 M de o descargue de cemento

UN

0

TOTAL COSTO DIRECTO ADMINISTRACIÓN 2% IMPREVISTOS 0% UTILIDAD 4% SUBTOTAL (ANTES DE IVA) IVA 19% TOTAL A FACTURAR RETEFUENTE 2% RETEGARANTIA 10% DESCUENTOS MATERIALES DESCUENTO SEGURIDAD SOCIAL AMORTIZACIÓN DE ANTICIPO 0% TOTAL A PAGAR

500

$

$ $ $ $ $ $ $

200.00 $

100,000

52,105,000 1,042,100 1,823,675 54,970,775 346,498 55,317,273

0 $

55,317,273

###

60,000.00

### 448,506.80 784,886.90 ### 149,128.51 ### 473,175.00 2,365,873.37 ###

300.00

60,000

33,997,840.00 679,956.80 1,189,924.40 35,867,721.20 226,085.64 36,093,806.84 717,355.00 3,586,772.12 31,789,679.72

200.0

23,527,593.28

________________________________ ________________________________ VoBo. Coordinador de obras VoBo. Director de Obra

________________________________ VoBo. Interventor

________________________________ VoBo. Contratista

________________________________ VoBo. Residente tecnico

________________________________ VoBo. Residente Admon.

________________________________ VoBo. Comfenalco

01.Apr.19 | PCP

VoBo. Presupuestos

COPIA CONTROLADA Octubre 9 de 2010, REV: 1 Sistema de Gestión Integral. 04/01/2019

40,000

18,107,160.00 362,143.20 633,750.60 19,103,053.80 120,412.36 19,223,466.16

OBRA CONTRATO OBJETO CONTRATISTA: NIT

Contratista MHF Servicios de Construcción sas

Capítulo - Item

Elemento

ACTA No 1 Desde 1 septiembre Hasta 23 de septiembre UND.

L

MEDIDAS H

A

Factor

Cantidad

CANT.

OBSERVACIONES

MOVIMIENTO DE TIERRAS Excavaciones Excavación manual 0-2 m Excavacion brecha desagues

m3

211.30

0.30

0.30

1.00

19.02

apiques busqueda box coulvert excavacion buscando firmeza

m3 m3

3.00 0.50

1.00 8.00

1.00 1.50

4.000 1.000

12.00 6.00

explanacion para sala de ventas excavacion sendero escalas

m3 m3

10.00 1.00

5.00 43.00

0.30 0.50

1.000 1.000

15.00 21.50

excavacion buscando desague excavacion para llenar costales

m3 m3

0.60 3.00

2.30 11.00

0.40 0.50

1.000 1.000

0.55 16.50

excavacion para muro excavacion peldaños

m3 m3

3.40 1.00

10.00 0.60

0.50 0.30

1.000 35.000

17.00 6.30

excavacion muro caspete exc para almacen

m3 m3

1.50 1.80

10.00 4.00

0.50 1.20

1.000 1.000

7.50 8.64

exc sendero peatonal excav para acopio de formaleta exc baños trabajadores

m3 m3

1.00 1.50 1.50

8.00 10.00 3.65

0.20 0.50 0.50

1.000 1.000 1.000

1.60 7.50 2.74

1.20

2.00

1.50

1.000

exc oficina siso Excavacion por nivelaciones--ver detalle nivelaciones exc baños ingenieros

m m3 3

m3 m3

3.60 38.60

1.50

2.60

0.80

1.000

Total

3.12 187.17 se debe hacer otrosi

Acarreo tierra Acarreo de tierra de excavaciones

m3

243.32

1.00

Total

243.32 243.32 se debe hacer otrosi

Llenos y nivelaciones Lleno con material de excavación almacen interventoria

m3 m3

1.50 1.40

4.00 3.10

6.30 6.80

1.00 1.00

37.80 29.51

direccion caspete obreros

m m3

1.20 1.50 0.90

3.60 5.70 3.40

8.30 9.60 10.00

1.00 1.00 1.00

35.86 82.08 30.60

0.00 0.00

2.60 3.00

4.00 3.66

1.00 1.00

0.00 0.00

1.50 1.50

1.50 1.00

4.00 0.60

1.00 1.00

9.00 0.90

211.30

0.30

0.30

1.00

19.02

baños of baños trabajadores siso sala de ventas brecha alcantarillado

3

m m3 3

m3 m3 m3 m3

Total

244.77 se debe hacer otrosi

Nivelación de terreno almacen interventoria direccion caspete obreros baños of baños trabajadores siso cemento sala de ventas

m2 m2 m2 m2

4.00

6.30

1.00

25.20

3.10 3.60

6.80 8.30

1.00 1.00

21.08 29.88

5.70 3.40 2.60 3.00 1.50 7.00 10.00

9.60 10.00 4.00 3.66 4.00 5.00 3.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00

54.72 34.00 10.40 10.98 6.00 35.00 30.00 se paga como excavacion…x

Total

257.26 0.15= 38.6 m³

CERRAMIENTO RETIROS

Retiro de malla existente Retiro de estacones existentes Retiro de puerta reja

un un un

70.00 10.00 2.00

1.00 1.00 1.00

70.00 10.00 2.00

ml ml un

38.00 28.00 15.00

1.00 1.00 1.00

38.00 28.00 se paga como estacon 15.00

Total INSTALACION

Instalación de malla Instalación de sarán Instalacion de estacones Total

43.00

CONCRETO PLACAS DE PISO caspete



5.70

9.60

0.10

1.00

5.47

obreros baños of baños trabajadores siso

m³ m³ m³ m³

3.40 2.60 3.00 1.50

10.00 4.00 3.66 4.00

0.10 0.10 0.10 0.10

1.00 1.00 1.00 1.00

Total

3.40 1.04 1.10 0.60

15.82

Corte y figuración Refuerzo para VIGAS casetas

kg

117.60

117.60

Total

117.60 se debe hacer otrosi

MORTEROS PISOS CASETAS caspete obreros baños of baños trabajadores siso

m² m² m² m² m²

9.60 10.00 4.00 3.66 4.00

5.7 3.4 2.6 3 1.5

1.00 1.00 1.00 1.00 1.00

Total

54.72 34.00 10.40 10.98 6.00 116.10

DEMOLICIONES Demolicion pisos y muros Demolicion muro en ladrillo de arcilla Demolición en muro en bloque Demolición en piso en concreto

m² m² m²

52.00 28.50 25.30

Total Roceria almacen interventoria direccion caspete obreros baños of baños trabajadores siso cemento brechas maestro acopio material

m² m² m² m² m² m² m² m² m² m² m² m²

6.00 6.00 6.00 5.70 5.50 4.00 4.00 4.00 12.00 211.00 6.00 9.00

6.30 6.80 8.30 13.00 10.00 6.00 6.00 6.00 11.00 2.00 4.00 10.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Total

37.80 40.80 49.80 74.10 55.00 24.00 24.00 24.00 132.00 422.00 24.00 90.00

997.50

Campamentos Construccion de campamentos trabajadores pasamanos

28.40 35.00

2.65 1.00

1.00 1.00

1.000 1.000

75.26 35.00

Total

110.26

Cunetas, cárcamos y sumideros Cunetas Cuneta provisional

m

39.00

39.00

Total

39.00

Mamposteria Muros de 10-20-40 liso oficina Direccion



oficina interventoria



caspete



7.80 3.40 8.50 6.85 3.60

2.80 2.65 2.40 2.80 2.65

2.00 3.00 1.00 4.50 0.40

2.65 2.65 1.80 2.40 2.40

-1.00 -1.05 -1.05 -2.25 1.05

2.250 1.230 1.230 0.080 1.230

3.00

1.00

Total Vaciado de vigas de amarre

21.84 9.01 24.27 19.18 9.54 -1.29 5.30 7.95 1.80 10.80 0.96 109.36

Oficina Direccion Oficina Interventoria

7.80 6.85

8.50 3.60

Caspete

4.50

8.10

3.40 2.40

19.70 12.85 12.60

Total

45.15 se debe hacer otrosi

DESCARGUE DE CEMENTO Descargue de cemento

un

300.00

1.00

1.00

Total PERSONAL POR ADMINISTRACION

300.00 300.00 se debe hacer otrosi

Ayudante descargue de madera desmonte de puertas cargue de material para oficina buscando medidor de acueducto cargue de sala de ventas traslado teleras y equipo

hr hr hr hr hr hr

4.00 7.00 4.00 2.00 36.00 6.00

4.00 7.00 4.00 2.00 36.00 6.00

busqueda de alcantarillado comision de topografia sacada de basura llenada de costales buscando mojon transporte formaleta transporte de adobe barrer calle moviendo muebles de ventas acarreo de arena repaliar triturado descargue de madera traslado a almacen organizar acopio de madera descargue de material acopio de tuberia traslado de arbol corte de canes para peldaños

hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr

7.00 36.00 124.00 224.00 4.00 82.00 40.00 8.00 20.00 20.00 36.00 7.00 40.00 27.00 7.00 4.00 3.00 10.00

7.00 36.00 124.00 224.00 4.00 82.00 40.00 8.00 20.00 20.00 36.00 7.00 40.00 27.00 7.00 4.00 3.00 10.00 Err:522 500.00

Oficial trabajos de energia trabajos acueducto salidas electricas inst hidrosanitarias organizando extensiones electricas organizando accesos oficinas Total

hr hr hr hr hr hr

10 2 5 2 2 2

1.00 1.00 1.00 1.00 1.00 1.00

10.00 2.00 5.00 2.00 2.00 2.00 23.00

solo se pagan 500 se debe hacer otrosi

Related Documents

Corte
May 2020 18
Corte
May 2020 27
Corte
October 2019 55
Corte-perfil.pdf
June 2020 24
Corte Directo.pdf
December 2019 43

More Documents from "Mileycha Alexandra Jimenez Serrano"

Belo Newsletter
May 2020 24
Supra Folder Layout
May 2020 28
Servier Ad Opt2
May 2020 28
Playtex Advertorial
May 2020 25