RESUMEN DE LA VALORIZACION DE OBRA N° 11 OBRA PRINCIPAL OBRA

MES DE JULIO 2016

ENTIDAD CONTRATANTE SUPERVISION CONTRATISTA

: MANTENIMIENTO PERIODICO DE LA CARRETERA PANAMERICANA NORTE SECTOR : SAN MARTIN (580+000) - CHICLAYO (776+000) - 1ra. Etapa : MINISTERIO DE TRANSPORTES, COMUNICACIONES - PROVIAS NACIONAL : CONSULTORES S.A. :CONTRATISTAS GENERALES S.A.

CONTRATO DE OBRA PRESUPUESTO BASE PRESUPUESTO CONTRATO FECHA PPTO. BASE / CONTRATO

: Nº 0XX-2004-MTC/20 : S/. 17`631,589.51 sin incluir IGV : S/. 17'948,773.92 sin incluir IGV : 30/06/2003

PAGO A CUENTA A CANCELAR AL CONTRATISTA MONTO

CONCEPTO

S/.

A.- Monto valorizado en el presente mes : - Valorizacion No.11 - Regularización Valorización anterior

208,939.38 208,939.38 0.00

B.- Reajuste de las Valorizaciones : - Reajuste de la Valorizacion No.11 - Regularizacion Reajuste Valorización anterior - Retención por atraso de Obra

#REF! #REF! #REF! 0.00

C.- Deducción del Reajuste que no corresponde : - Por Adelanto Directo - Por Adelanto de Materiales - Por Regularización del Adelanto Directo - Por Regularización del Adelanto de Materiales

#REF! #REF! #REF! 0.00 #REF!

D.- Amortización del Adelanto Directo : - En la Valorizacion No.11 - Regularización Valorización anterior

#REF! #REF! #REF!

E.- Amortizacion del Adelanto de Materiales : - En la Valorizacion No.11 - Regularización Valorización anterior

#REF! #REF! #REF!

F.- Otros : - Otros

0.00 0.00

I.- TOTAL ABONOS (sin IGV) (A+B+C+D+E+F)

S/.

Retenciones : - Multa por atraso injustificado en inicio de trabajos - Multa por falta o deficiencia de mantenimiento de tránsito - Multa por no presentación del CAO Actualizado - Multa por atraso del Calendario de Utilización de Equipos

#REF! 0.00 0.00 0.00 0.00 0.00

II.- TOTAL RETENCIONES

S/.

0.00

III.- MONTO NETO A PAGAR ( I - II )

S/.

#REF!

IV.- I.G.V. ( 19% DE I )

S/.

#REF!

V.- MONTO A FACTURAR ( I + IV )

S/.

#REF!

SON : VEINTISEIS MIL DOSCIENTOS VEINTITRES Y 58/100 NUEVOS SOLES S.E.ú.O NOTA : 1.- Se aplica el 19 % por concepto de IGV , según lo dispuesto en la Adenda No. 01 al Contrato de Obra ,con fecha 25.03.2004

OBRA : MANTENIMIENTO PERIODICO DE LA CARRETERA PANAMERICANA NORTE SECTOR : SAN MARTIN (580+000) - CHICLAYO (776+000) SUPERVISION : CONSULTORES S.A. CONTRATISTA : CONTRATISTAS GENERALES S.A.

VALORIZACION DE OBRA Nº 11 OBRA PRINCIPAL MES DE FEBRERO- 2005 ITEM.

DESCRIPCION DE PARTIDA

1.000 1.101 1.103

OBRAS PRELIMINARES MOVILIZACION Y DESMOVILIZACION DE EQUIPOS MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL

2.000 2.101 2.103a 2.103b 2.109 2.112 2.113 2.208 2.401 2.402 2.406 2.410 2.420 2.421 2.423 2.500

UND

METRADO BASE

P.U. BASE

PRESUPUESTO BASE

S/.

S/.

METRADO

74.59% 24.04%

0.00  0.00  0.00  0.00  0.00 

0.00  0.00  0.00  0.00  0.00 

0.00% 0.00% 0.00% 0.00% 0.00%

3,840.00 41,854.18 494,092.18 1,024,515.20 18,126.09 2,563,475.97 932,395.51 875,766.00 724.47

52,416.00 15,067.50 133,404.89 1,208,927.94 2,187,094.02 2,973,632.13 1,389,269.31 472,913.64 153,804.98

100.00% 57.81% 97.50% 97.74% 99.35% 97.57% 67.64% 100.00% 98.70%

12,688.41 2,838.81 9,849.60

251.00 930.65

12,387.28 2,838.81 9,548.47

97.63% 100.00% 96.94%

91.29 12.79 14.49 20.51 14.75

1,220,396.39 21,909.60 246,412.14 938,879.55 7,383.60 5,811.50

240.00 16,800.00 58,521.77 340.38 358.00

1,097,023.74 21,909.60 214,872.00 847,980.45 6,981.19 5,280.50

89.89% 100.00% 87.20% 90.32% 94.55% 90.86%

S/. S/. S/. S/.

13,913,817.48 2,326,390.28 1,391,381.75 17,631,589.51

10,611,692.70 1,774,275.02 1,061,169.27 13,447,136.99

161,968.96 27,081.21 16,196.90 205,247.07

S/. %

17,948,773.92

13,689,044.97 76.27%

208,939.38 1.16%

338.00 358.76 76.62 4.16 5.79 6.35 13.65 0.36 0.27 1.18 120.66 1.16 1.49 0.54 212.30

12,255,068.76 2,305,498.00 275,168.92 101,521.50 416.00 165,015.00 23,495.00 52,416.00 26,062.56 136,823.31 1,236,922.02 2,201,441.70 3,047,666.84 2,053,880.07 472,913.64 155,828.20

3.000 3.303 3.304

OBRAS DE ARTE Y DRENAJE LIMPIEZA DE ALCANTARILLAS METALICAS, INC. CABEZAL LIMPIEZA DE ALCANTARILLAS DE CONCRETO, INC. CABEZAL

ML ML

251.00 960.00

11.31 10.26

4.000 4.805a 4.805b 4.810a 4.810b 4.825

SEÑALIZACION Y SEGURIDAD VIAL POSTE DELINEADOR TACHA REFLECTIVA MARCAS EN EL PAVIMENTO PINTADO DE PARAPETOS Y MUROS DE ALCANTARILLAS CAPTAFAROS

240.00 19,266.00 64,795.00 360.00 394.00

PRESUPUESTO AFECTADO POR F.R. (S/IGV) AVANCE PORCENTUAL

F.R.=

1.017989553

NOTA : La comparación del Avance Porcentual, incluyendo los Deductivos aprobados se muestra en el cuadro adjunto.

0.15 0.45

37,993.09 29,374.26 8,618.83 74,511.24

0.00  0.00  0.00  100.00

ACUMULADO MES ACTUAL %

9,140,850.41 554,320.00

6,821.00 767.00 1,325.00 100.00 28,500.00 3,700.00 3,840.00 72,396.00 506,753.00 1,048,239.00 18,245.00 2,627,299.00 1,378,443.00 875,766.00 734.00

E.F.-

S/.

1,640.00

M3 M3 M3 M3 ML ML M2 M2 M2 M2 M3 KG LT KG M3

16.72% 10.00%

METRADO

84.91% 85.00% 84.83%

PAVIMENTOS PARCHADO SUPERFICIAL CARPETA ASFALTICA PARA PARCHADO PROFUNDO BASE GRANULAR PARA PARCHADO PROFUNDO DESARENADO DE CALZADA Y BERMAS TRATAMIENTO DE FISURAS FINAS TRATAMIENTO DE FISURAS GRUESAS REPARACION SUPERFICIAL DE BERMAS CON CARPETA ASFALTICA IMPRIMACION ASFALTICA RIEGO DE LIGA SELLO ASFALTICO PAVIMENTO DE CONCRETO ASFALTICO CEMENTO ASFALTICO PEN 60/70 EMULSION ASFALTICA FILLER O RELLENO MINERAL NIVELACION DE BERMA CON MACADAM BITUMINOSO

COSTO DIRECTO GASTOS GENERALES UTILIDAD TOTAL PRESUPUESTO BASE S/IGV

%

361,431.27 166,454.14 194,977.13

1.00 12.00

A.B.C.D.-

S/.

PRESENTE VALORIZACION

0.85 10.18

195,828.40 19,152.96

425,663.92 195,828.40 229,835.52

Glb MES

UND UND M2 M2 UND

ACUMULADO MES ANTERIOR

8.93% 15.00% 3.75%

METRADO

1.00 10.63

0.61%

0.00% 0.00% 0.00%

1,640.00

0.00  0.00 

416.00

100.00%

100.00

0.00  0.00  0.00 

0.00% 0.00% 0.00%

0.00  0.00 

763.83 1,968.61

274.98 531.52

1.06% 0.39%

0.00 

0.00%

117.94 33,231.50 12,406.94

14,230.64 38,548.54 18,486.34

0.65% 1.26% 0.90%

0.00 

0.00%

2,023.22

1.30%

9.53

0.00

0.00  0.00  49,464.63 1,539.00 1,990.85 19.62 36.00

3,840.00 42,618.01 496,060.79 1,024,515.20 18,244.03 2,596,707.47 944,802.45 875,766.00 734.00

0.00%

0.00% 0.00%

251.00 930.65

4.05%

0.00 

0.00%

19,683.81 28,847.41 402.41 531.00

7.99% 3.07% 5.45% 9.14%

240.00 18,339.00 60,512.62 360.00 394.00

MONTO PRESUP. CONTRATO MONTO PRESUP.BASE FACTOR DE RELACION FECHA DE PRESUPUESTO BASE

: S/. 17,948,773.92 : S/. 17,631,589.51 : 1.017989553 : 30/06/2003

VALORIZACION DE OBRA Nº 11

A PRINCIPAL MES DE FEBRERO- 2005 ACUMULADO MES ACTUAL S/.

SALDO POR VALORIZAR %

399,424.36 195,828.40 203,595.96

93.84% 100.00% 88.58%

9,215,361.65 554,320.00

75.20% 24.04%

0.00  0.00 

0.00% 0.00%

METRADO

S/.

%

26,239.56

6.16%

0.00 

0.00 

0.00%

1.37

26,239.56

11.42%

5,181.00 767.00 1,325.00

3,039,707.11 1,751,178.00 275,168.92 101,521.50

24.80% 75.96% 100.00% 100.00%

416.00

100.00%

0.00 

0.00 

0.00%

0.00  0.00 

0.00% 0.00%

28,500.00 3,700.00

165,015.00 23,495.00

100.00% 100.00%

52,416.00 15,342.48 133,936.41 1,208,927.94 2,201,324.66 3,012,180.67 1,407,755.65 472,913.64 155,828.20

100.00% 58.87% 97.89% 97.74% 99.99% 98.84% 68.54% 100.00% 100.00%

12,387.28 2,838.81 9,548.47

97.63% 100.00% 96.94%

1,146,488.37 21,909.60 234,555.81 876,827.86 7,383.60 5,811.50

93.94% 100.00% 95.19% 93.39% 100.00% 100.00%

0.00 

0.00 

0.00%

29,777.99 10,692.21 23,723.80 0.97 30,591.53 433,640.55

10,720.08 2,886.90 27,994.08 117.04 35,486.17 646,124.42

41.13% 2.11% 2.26% 0.01% 1.16% 31.46%

0.00  0.00 

0.00  0.00 

0.00% 0.00%

0.00 

0.00 

0.00%

29.35

301.13

3.06%

301.13

73,908.02

2.37%

6.06%

0.00 

0.00 

0.00%

927.00 4,282.38

11,856.33 62,051.69

4.81% 6.61%

0.00  0.00 

0.00  0.00 

0.00% 0.00%

10,773,661.66 1,801,356.23 1,077,366.17 13,652,384.06

3,140,155.82 525,034.05 314,015.58 3,979,205.45

13,897,984.35 77.43%

4,050,789.57 22.57%

OBRA : MANTENIMIENTO PERIODICO DE LA CARRETERA PANAMERICANA NORTE SECTOR : SAN MARTIN (580+000) - CHICLAYO (776+000) SUPERVISION : CONSULTORES S.A. CONTRATISTA : CONTRATISTAS GENERALES S.A.

RESUMEN DE VALORIZACION (Incluyendo Presupuestos Deductivos) 1.- OBRA PRINCIPAL PRESUPUESTO VAL. DESCRIPCION

Obra Principal

OFERTADO

VALORIZACION

SALDO

ACUM. ANTERIOR

MES ACTUAL

ACUMULADA ACTUAL

POR VALORIZAR

S/.



S/.

17,948,773.92

11

13,689,044.97

208,939.38

13,897,984.35

15,680,367.06

13,689,044.97

208,939.38

13,897,984.35

1,782,382.71

100.00%

87.30%

1.33%

88.63%

11.37%

-165,513.07

Presupuesto Deductivo 02

-87,279.22

Presupuesto Deductivo 03

-2,015,614.57

% DE AVANCE

VALORIZACION

S/ IGV

Presupuesto Deductivo 01

TOTAL AVANCE

VALORIZACION

S/.

%

S/. 88.63%

%

1,782,382.71

11.37%