01.- Plano Clave Ptar-layout1.pdf

  • Uploaded by: cesar
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 01.- Plano Clave Ptar-layout1.pdf as PDF for free.

More details

  • Words: 2,862
  • Pages: 1
CREADO CON UNA VERSIÓN PARA ESTUDIANTES DE AUTODESK

CAMARA DE BOMBEO EL CUCHO Sistema de Coordenadas: PSAD 1956 UTM Zone 17S

LEYENDA A A´ 17 ´

B´ B´



16

`

D´ 1.00

1.30

A

P01

SARDINEL

1.00



1.30

´15

´A

P01

15

PT CUCHO

N.P.T. +47.55 GRASS

N.P.T. +47.40 PISO DE ADOQUIN

F´ 13

DN1200 DN1200

PEDESTAL CONCRETO FC=210 KG/CM2 0.30 X 0.30 H=0.5

COLUMNA H 10.22 pulg. 10.08 pulg x 0.68 pulg

12

14

´

VIGA H 6.20 pulg x 6.02 pulg x 0.37pulg

C1

E=535,465.639 m. N=9'459,980.104 m. Z=47.483

C1

VP(0.60×0.30)

B VS(0.50×0.30)

´A

13 ´13 ´

C1

11 VS(0.50×0.30)

02

VIGA H 10.22 pulg x 10.08 pulg x 0.68pulg

N.P.T. +47.55

C1

VP(0.60×0.30)

GRASS

10A

12

N.P.T. +47.55 GRASS

10

CAMINO DE ACCESO N.P.T. +47.55 PISO DE CEMENTO PULIDO BRUÑADO

11

´

+42.80

CAMINO DE ACCESO N.P.T. +47.55

9

A

03

REJILLAS DE DRENAJE

10

´10´

PISO DE CEMENTO PULIDO BRUÑADO

03

04

PLUVIAL

SARDINEL

8 9´

N.P.T. +47.55 GRASS

06

07

05

CAMINO DE ACCESO N.P.T. +47.55

7A

PISO DE CEMENTO PULIDO BRUÑADO

7



VOLUMEN : 97.00 m3. MATERIAL : CONCRETO ARM. SISTEMA : CAMARA HUMEDA Y SECA N° DE BOMBAS : --- UNIDADES POTENCIA DE BOMBAS : 100 hp SISTEMA DE PRE TRATAMIENTO 01 POZO DE GRUESOS 02 REJAS MEDIAS DE 15 mm 01 TORNILLO TRANSPORTADOR 01 COMPACTADOR LAVADOR 02 DESARENADORES VORTEX 02 CLASIFICADORES DE ARENA

PATIO DE MANIOBRAS N.P.T. +47.40 PISO DE ADOQUIN

SARDINEL +42.65



7´A

+42.65

6

17

B

VEREDA N.P.T. +47.55

0.15

B

1.50

08

08

N.P.T. +47.55

3.38

PISO CEMENTO PULIDO BRUÑADO

0.60

9.00 0.80

2.40

5

1.81

ELECTROBOMBA CENTRIFUGA HORIZONTAL

0.70

4.20

CISTERNA

V11

P-M6

0.70



0.90 0.15

PISO CEMENTO PULIDO BRUÑADO

V3

V2

0.70

V2

0.70

1.08

V10

CAMINO DE ACCESO N.P.T. +47.55

1.09

0.70

PISO CEMENTO PULIDO BRUÑADO

0.62 0.15 1.50

V2

0.70

0.70 VEREDA N.P.T. +47.55

P-M3

V2

0.70



0.70

HIDRONEUMATICO

16

SARDINEL

4A

4

0.72

P-M4

1.23

N.P.T. +47.55 GRASS

0.31

N.P.T.= +39.10

PISO CERAMICO .30x.30 COLOR GRIS

0.46

V8

0.25

0.62

15

0.25

0.25

0.72

0.25

SARDINEL

V1

V1

1.23

P-M5

0.72

PLUVIAL

0.91



.72



0.30

A

1.52

14

0.69

0.70

PISO DE CEMENTO PULIDO BRUÑADO V9

REJILLAS DE DRENAJE

V1 V1

TAPA DE FIBRA DE VIDRIO E=1pulg.

0.72

Llega tub. Ø 200 mm canal villa

V1

V1

VEREDA

1.23

N.P.T. +47.55 PISO CEMENTO PULIDO BRUÑADO

1.30

P01

1.00 1.85

PORTON

V-6 1.90

V1

V1

3.00 x 3.50

P-M9

0.15

1.23

GRASS

V1

CUARTO DE MEDIA TENSION

N.P.T. +47.65

V1

0.72

CUARTO DE TABLEROS

GE

PISO DE CEMENTO PULIDO BRUÑADO

0.72

GE 506KW-460V

10

N.P.T. +47.65

272KW-460V

N.P.T. +47.65

V1 PISO DE CEMENTO PULIDO BRUÑADO

14 GRASS

2

PISO DE CEMENTO PULIDO BRUÑADO

N.P.T. +47.55

N.P.T. +47.55

LOSA DE CONCRETO ARMADO N.P.T. +47.55

0.72



V-5 1.40

V-6 1.90

1.23

V-5 1.40

1.00 1.85

1.00 1.85

PORTON DOS HOJAS DE METAL

P-M7

0.72

1.00 1.85

V-5 1.40

RAMPA S:10%

VEREDA N.P.T. +47.55 PISO CEMENTO PULIDO BRUÑADO

1.00

1.00 1.85

1.23

RAMPA S:10%

Ingresa a Camara humeda.

VEREDA N.P.T. +47.55 PISO CEMENTO PULIDO BRUÑADO



0.72



1.23

3

B

13

N.P.T. +47.55

1.23

PISO DE CEMENTO PULIDO BRUÑADO

12

3.17

11

GRASS

V1

V1

.72 1.23

0.72

1.04

0.72

N.P.T. +47.55

1

GRASS

B

A

B

C J2

D

E

F

G

H

J

J2

K

L

M

M2

N

O

P

Q

A

LEYENDA COLECTORES BZ-PLAZA E=534,613.723 m. N=9'459,462.425 m. Z=58.853

BM-11 E=534,369.206 m. N=9'459,348.286 m. Z=48.063 m.s.n.m.

COLECTOR CANCHAQUE

CANAL VIA-LONGITUD PASE 20 M

LÍNEA PRINCIPAL Y AUXILIAR PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 159.95 mts. TUB. GRP PN1 - SN5000 DN 700 mm LONGITUD : 810.24 mts. TUB. GRP PN1 - SN5000 DN 1,000 mm LONGITUD : 86.20 mts.

DN 1000 HDPE

COLECTO AREA DE

CONTROL PROCESOSDE

NPT 38.30

AREA INCUBACION

DEPOSITO REACTIVOS

LABORATORIO DE ANALISIS FISICO QUIMICO

CUARTO

DE DESPERDICIOS

LIMPIEZA

NPT 38.30

SERVICIOS

LAVANDERIA

ALMACEN ROPA

HIGIENICOS

LIMPIA

DN 1000mm

RIEGO E INCENDIO

SERVICIO

AGUA DE

DE BOMBEO

AGUA DE

CAMARA

AGUA DE CLORACION

DN 250mm

CASETA DE CLORACION

DN 200mm

NPT 38.80

N° 2

DE CLORO

N° 1

DE CLORO

ALMACEN

DE CLORO

DE CONTACTO

DE CONTACTO TANQUE

NPT 39.80

OR

NPT 39.80

0 38.3

NPT 39.80

NPT

NPT 38.30

CAMARA DE BOMBEO CB-7 2

1 3

4 2

1 1

5

4

3

5

3

LAVANDERIA

1

5

4

2

2 3 5

2

5

1

4

4 3 1

3

2

5

4

5

4

3

5

1

5

2

1

ALMACEN

ROPA LIMPIA

3

4

2

4

2

5

3

2

3

4

4

5

1

3

4

4

2

1

1

5

5

3

1

2

5

3 2

SERVICIOS HIGIENICOS

4

3

5 4

3

5

2

1

6

5

4

3

2

4

2

3

1

2

1

7 8 3

4

5

1

11

5

12

4

3

2

10

2

1

12

11 10

NPT 39.80

9 8

3

2

3

1

4

3

2

4

2

1

5 5

4

1

3

4

5

4

1

4

5

6 3

2

2

5

7

1

3

2

1

2

1

· · · · · · · · · · ·

9

AREA RESERVADA PARA FUTURA CONSTRUCCION DE DESHIDRATADOR MECANICO DE LODOS 3 4

1 2

2

3 1

4

3

5

4 5

1 2

5

5

3

NPT 39.80

3

2 3 4

5

5

2

5

1

4 1

4

5

3

4

3

2

4

4

CAMARA DE BOMBEO CB-3

2

2

1

3

5

CAMARA DE BOMBEO CB-8

5

1

4

4

5 3

1

2

3

4

5

5

3

2

4

1

5

2

1

4 3

2

CAMARA DE BOMBEO CB 2

NPT 39.80

BM-14

LINEA DE IMPULSION EL CUCHO

CA

LONGITUD : 1563.00 mts. MATERIAL : GRP PN 6 SN2500 DIAMETRO : 700 mm.

PTAR SULLANA

DIA

A

COLECTOR CAYETANO HEREDIA

BM-05 E=535,276.950 m. N=9'458,729.370 m. Z=58.807 m.s.n.m

PVC ISO 21138:2010 SN4 DN 355 mm LONGITUD : 192.37 mts.

Qpro : 547.83 L/S Qmaxh : 986.10 l/s

NO HERE

CT OR CO LE

0 38.8

MARGEN DERECHO: PVC ISO 21138:2010 SN4 DN 250 mm LONGITUD : 506.00 mts. PVC ISO 21138:2010 SN4 DN 315 mm LONGITUD : 258.11 mts.

LINEA DE SIFON INVERTIDO

COLECTO R CAYETA

SU LL AN

NPT

TARAPACÁ

LONGITUD : 4715.11 mts. MATERIAL : GRP PN16 SN 5000 DIAMETRO : 800 mm.

38.80 NPT

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 137.50 mts.

E=534,896.124 m. N=9'459,000.287 m. Z=54.088 m.s.n.m.

PA

39.80

CAMARA DE BOMBEO CB-1

PVC ISO 21138:2010 SN4 DN 250 mm LONGITUD : 444 mts. PVC ISO 21138:2010 SN4 DN 315 mm LONGITUD : 0.00 mts.

MARGEN IZQUIERDO:

BM-12

COLECTOR SANTA ROSA INICIO DE SIFON INVERTIDO

GRP

DN70 GATO DE ERA ESCAL

S

=

24% RIDAD 0m. BARA Fº Gº NDA Ø1 1/2 DE SEGU " H=1.0

=

2‰

E=531,375.062 m. N=9'458,448.912 m. Z=39.488

E=533,544.973 m. N=9'458,622.911 m. Z=62.023 m.s.n.m.

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 297.36 mts.

TUB. GRP PN1 - SN5000 DN 500 mm LONGITUD : 68.40 mts.

TA TARJE TIPO UERTA COMP DE DA DERO ENTRA

S

=

1‰

VERTE

O CUCH

IGN

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 639.57 mts.

BM-13

SUBCOLECTOR SULLANA

VIENE

0

GRP

JAR

DN80

ALBU

Z LÓPE IMP. DE

0

GRP

DN50

VIENE

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 364.95 mts.

E=532,120.894 m. N=9'457,595.270 m. Z=61.936 m.s.n.m.

EMPALME

LONGITUD : 2761.23 mts. MATERIAL : GRP PN10 SN 5000 DIAMETRO : 500 mm.

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 418.88 mts. QmaxHor : 14.398 lt/s

AREA LIBRE

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 1,103.33 mts.

TUB. GRP PN1-SN 5000 DN 600 mm LONGITUD : 265.00 mts.

MARGEN IZQUIERDO: PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 928.03 mts.

TUB. GRP PN1-SN 5000 DN 1,000 mm LONGITUD :0.00 mts.

MARGEN DERECHO:

QmaxHor : 159.710 lt/s

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 991.77 mts.

COLECTOR INDUSTRIAL 01

PVC ISO 21138:2010 SN4 DN 250 mm LONGITUD : 0.00 mts.

SUBCOLECTOR BUENOS AIRES

TUB. GRP PN1 - SN5000 DN 400 mm LONGITUD : 233.58 mts.

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 1,251.79 mts.

QmaxHor : 14.40 lt/s

BM-02 EMPALME A COLECTOR BUENOS AIRES

EMPALMES EMPALME COLEC. CHAMPAGNAT PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 931.70 mts.

E=535,977.634 m. N=9'457,132.259 m.

TUB. GRP PN1 - SN5000 DN 400 mm LONGITUD : 5.90 mts. QmaxHor : 82.61 lt/s

QUEBRADA-LONGITUD PASE 80 M

Z=68.184SN4 DN 200 mm PVC ISO 21138:2010 LONGITUD : 1,325.87 mts.

E=535,591.878 m. N=9'457,064.587 m. Z=65.907 m.s.n.m.

DN 900

PEDESTAL CONCRETO FC=210 KG/CM2 0.30 X 0.30 H=0.5

1 COLUMNA H 10.22 pulg. 10.08 pulg x 0.68 pulg

P-2

C1

C1

VP(0.60×0.30)

VS(0.50×0.30)

P-1 PULIDO

1.30

CEMENTO

C1

BRUÑADO

C1

1.00 1.85 V-4 1.40



3

P01

1.00 1.30

RAMPA S:10%

4´ GE

4

E

P01

0V

4A

1.00

272KW-46

TG

1.30

N.P.T. 30*30cm

13

+59.52

CERAMICO

03

03

04

06 PULIDO

V-5 2.85

CEMENTO

VEREDA +59.42

N.P.T.

1.00 1.85

PISO

BRUÑADO



5 1.00 1.85 V-6 1.90

05

1.30

SALA

P01

07

1.00



30*30cm

1.00 1.85

S

12

+59.52

TABLERO

CERAMICO

N.P.T.

DE

6

V-6 1.90 CEMENTO

07

PULIDO

VEREDA +59.42

N.P.T.

PISO

BRUÑADO

P01

1.00

7

1.30



2400

V2

P-M7

1584

600

7A

3385

08

30*30cm

+59.52

CERAMICO

N.P.T.

1028

08

700 700 V2

8 1090

09

700

700

V2

1082

V1

V1

A 715

V1

V1

9

1228



CAMARA DE BOMBEO

715

1228

V1

SALIDA DEL FLUJO HACIA LA CAMARA DE BOMBEO

8´A

Ingresa a Camara humeda.

V1

10

10

V1

C

V1

715



700

700

V2

700

700

V-7 1.70

11

1.00 1.85

V3

10A

10´ V1

V1

V1

V1 V1

V1

11´

11

C

11´A

12´

254

TRIA

L3

PISO CEMENTO PULIDO BRUÑADO N= +61.850

PISO CEMENTO PULIDO BRUÑADO N= +61.850

15

13

10

PATIO ADOQUINADO N= +61.500

N= +61.850

0.6 VV 0 -1

02 06

02

P2

0.60 VV-1

01

CASETA DE BOMBEO

02

TAPA DE REJAS

06 PROYECCION TECHO 2.10 1.50

PROY. TAPA INSPECCION 0.60 VV-1

TRAFO BT 50KVA

2.10 1.50

P1

Sistema de Coordenadas: PSAD 1956 UTM Zone 17S

0.60 VV-1

0.60 VV-1

2.10 1.50

2.10 1.50 0.60 VV-1

0.60 VV-1

IMPULSION VA HACIA EL BUZON DEL COLECTOR INDUSTRIAL Nº 01

V2

N= +61.850

PISO CEMENTO PULIDO BRUÑADO

N= +61.850

PISO CEMENTO PULIDO BRUÑADO

PISO CEMENTO PULIDO BRUÑADO

PM-01

05

CISTERNA

N= +61.950 Piso cemento pulido bruñado

NIVEL DE PISO PULIDO N= + 62.05

2.10 1.50

HIDRONEUMATICO

N= +61.850

CENTRIFUGA HORIZONTAL

P1

PATIO ADOQUINADO N= +61.500

06

N= +61.950 Piso cemento pulido bruñado

N= +61.850

CONTROL DE OLORES

OFICINA ADMINISTRATIVA

V1

PISO CEMENTO PULIDO BRUÑADO

P1

VOLUMEN : 14.00 m3. MATERIAL : CONCRETO ARM. SISTEMA : CAMARA HUMEDA Y SECA N° DE BOMBAS : --- UNIDADES POTENCIA DE BOMBAS : 100 hp

N= +61.950 Piso cemento pulido bruñado

0.60 VV-1

DIAMETRO : 350mm.

2.10 1.50

MATERIAL : GRP-PN10-5000

20

TP

SALA DE TABLERO

V2

10

01

LONGITUD : 1875.71 mts.

CAMARA DE BOMBEO IND. 01

TT-A

10 COVERS GRATINGS

2.10 0.60 1.50 VV-1

LINEA DE IMPULSION INDUST.

E=533,597.989 m. N=9'456,506.028 m. Z=64.659 m.s.n.m.

GE

01

06

2.10 1.50

BM-7

Sistema de Coordenadas: PSAD 1956 UTM Zone 17S

03



DUS

N= +61.950



R IN

Piso cemento pulido bruñado

D´ D´2

CTO

PISO CEMENTO PULIDO BRUÑADO



COL E

E=536,545.239 m. N=9'456,809.723 m. Z=74.634 m.s.n.m.

P3





BM-01

2.1 1.5 0 0



G´ G´2

VOLUMEN : 37.00 m3. MATERIAL : CONCRETO ARM. SISTEMA : CAMARA HUMEDA Y SECA N° DE BOMBAS : --- UNIDADES POTENCIA DE BOMBAS : 100 hp SISTEMA DE PRE TRATAMIENTO 01 POZO DE GRUESOS 02 REJAS MEDIAS DE 15 mm 01 TORNILLO TRANSPORTADOR 01 COMPACTADOR LAVADOR 02 DESARENADORES VORTEX 02 CLASIFICADORES DE ARENA

USTR R IND

GRUPO ELECTROGENO

12

13´

CTO COLE

VS(0.50×0.30)

2.10 0.90

INGRESO DEL FLUJO

2

02 VP(0.60×0.30)

NPT. 55.549

2.20 0.75

CISTERNA

CAMARA DE BOMBEO LOPEZ ALBUJAR

INGRESO DEL FLUJO

15

VEREDA +59.42

N.P.T.

PISO



01

VIGA H 6.20 pulg x 6.02 pulg x 0.37pulg

1.00 P01

14 N.P.T. +59.52

CERAMICO 30*30cm

IAL 1

L

1.00 P01

1.30

16

TUB. GRP PN1-SN 5000 DN 600 mm LONGITUD : 5.19 mts.

0.6 VV 0 -1 2.1 1.5 0 0

1.30

K

J

I

H

G

F

E

D2

TUB. GRP PN1-SN 5000 DN 400 mm LONGITUD : 45.53 mts.

BM-03

Piso: pulido

A

D

C

B

PVC ISO 21138:2010 SN4 DN 250 mm LONGITUD : 0.00 mts.

TUB. GRP PN1- SN5000 DN 500 mm LONGITUD : 680.60 mts.

E=533,134.661 m. N=9'457,145.648 m. Z=61.153 m.s.n.m

A

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 389.60 mts.

COLECTOR CHAMPAGNAT

BM-8



MARGEN DERECHO:

TUB. GRP PN1 - SN5000 DN 450 mm LONGITUD : 766.00 mts.

COLECTOR CHAMPAGNAT

LINEA DE IMP. LOPEZ ALBURJAR

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 2,616.27 mts.

01 POZO DE GRUESOS 02 REJAS MEDIAS DE 15 mm 01 TORNILLO TRANSPORTADOR 01 COMPACTADOR LAVADOR 02 DESARENADORES VORTEX 02 CLASIFICADORES DE ARENA

PVC ISO 21138:2010 SN4 DN 315 mm LONGITUD : 0.00 mts.

S

BM-9

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 1,486.54 mts.

OS AIRE

SUB COLECTORES

EL SISTEMA DE PRE TRATAMIENTO DE LA PTAR, SE ENCUENTRA EN LAS CAMARAS DE BOMBEO. LAS CAMARAS DE BOMBEO, CUENTAN CON EL SIGUIENTE PROCESO DE PRE TRATAMIENTO :

MARGEN IZQUIERDO:

R BUEN

E=530,751.786 m. N=9'457,731.404 m. Z=64.876 m.s.n.m.

TUB. GRP PN1 - SN5000 DN 700 mm LONGITUD : 698.54 mts.

E=535,386.750 m. N=9'458,107.090 m. Z=61.036 m.s.n.m.

EMPALME A COLECTOR SULLANA

COLECTOR SANTA ROSA

E=532,579.505 m. N=9'457,722.109 m. Z=62.219

BM-10

COLECTOR LOPEZ ALBUJAR

COLECTOR BUENOS AIRES

QmaxHor : 714.98 lt/s E=534,295.039 m. N=9'458,043.598 m. Z=58.283 m.s.n.m.

BZ-CBONITO

NOTA :

BM-04

O COLECT

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 333.31 mts.

TUB. GRP PN1-SN 5000 DN 600 mm LONGITUD : 584.22 mts. TUB. GRP PN1-SN 5000 DN 1,200 mm LONGITUD : 50.90 mts.

MARGEN IZQUIERDO:

E=533,539.395 m. N=9'458,179.509 m. Z=62.378

EMPALME A COLECTOR SANTA ROSA

E=531,682.910 m. N=9'458,128.651 m. Z=69.246

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 543.50 mts.

PATIO ADOQUINADO N= +61.500

.20

02

.20

V3

07

BAÑO

N= +61.950 Ceramica 30×30

P4

N= +61.850

PISO CEMENTO PULIDO BRUÑADO

PISO CEMENTO PULIDO BRUÑADO N= +61.850

P5

P6

COLECTOR INDUSTRIAL 03 TUB. GRP PN1 - SN5000 DN 900 mm LONGITUD : 1,150.90 mts. QmaxHor : 136.770 lt/s EMPALME A COLECTOR INDUSTRIAL 03 PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 640.76 mts.

COLECTOR INDUSTRIAL 02

COLECTOR INDUSTRIAL 2

PVC ISO 21138:2010 SN4 DN 315 mm LONGITUD : 806.86 mts. PVC ISO 21138:2010 SN4 DN 400 mm LONGITUD : 65.85 mts. TUB. GRP PN1-5N 5000 DN 600 mm LONGITUD : 1,713.47 mts. QmaxHor : 83.460 lt/s

BM-6 E=533,654.080 m. N=9'455,461.830 m. Z=76.971 m.s.n.m.

Escala Horizontal:

25

50

75

100

1/7,500

MUNICIPALIDAD PROVINCIAL DE SULLANA

CONSORCIO PTAR MW

“MEJORAMIENTO DEL SISTEMA DE EVACUACIÓN, TRATAMIENTO Y DISPOSICIÓN FINAL DE AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA, PROVINCIA DE SULLANA - PIURA”

CREADO CON UNA VERSIÓN PARA ESTUDIANTES DE AUTODESK

PLANTA

0

PLANO CLAVE DE SULLANA PTAR

P-CLAVE-PROY

1

01/01

CREADO CON UNA VERSIÓN PARA ESTUDIANTES DE AUTODESK

BZ-PTAR

EMPALME A COLECTOR CAYETANO H.

TUB. GRP PN1-SN 10000 DN 600 mm LONGITUD : 991.42 mts.

EL

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 553.77 mts.

ESTRUCTURA DE INICIO DE SIFON

TUB. GRP PN1 - SN5000 DN 400 mm LONGITUD : 308.73 mts.

MARGEN DERECHO: PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 325.71 mts.

IMP.

SUBCOLECTOR SANTA ROSA

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 596.60 mts.

TUB. GRP PN1- SN5000 DN 450 mm LONGITUD : 1,139.35 mts.

DE

E=532,358.670 m. N=9'458,215.976 m. Z=73.011

SUBCOLECTOR CAYETANO HEREDIA

TUB. GRP PN1 - SN5000 DN 355 mm LONGITUD : 215.15 mts.

EMPALME A COLECTOR TARAPACÁ

QmaxHor : 22.040 lt/s

BZ-VRAUL

QmaxHor : 50.392 lt/s

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 0.00 mts.

SUBCOLECTOR TARAPACÁ

PVC ISO 21138:2010 SN4 DN 355 mm LONGITUD : 553.77 mts.

TUB. GRP PN1 - SN5000 DN 355 mm LONGITUD : 325.30mts.

COLECTOR SULLANA

QmaxHor : 52.990 lt/s

PVC ISO 21138:2010 SN4 DN 200 mm LONGITUD : 448.22 mts.

MATERIAL : GRP PN 16-10 SN5000 DIAMETRO : 800 mm-500 mm.

0

CAJA-PTAR

PVC ISO 21138:2010 SN4 DN 400 mm LONGITUD : 567.12 mts.

S

· ·

CREADO CON UNA VERSIÓN PARA ESTUDIANTES DE AUTODESK

TA

NPT 38.80

NPT

· · · · · · · · · · ·

EMPALMES A COLECTOR CANCHAQUE RA

1

3

2

NPT 39.80

NPT 38.80

QmaxHor : 142.934 lt/s

AQUE

LE

CT

NPT 39.80

TANQUE

R CANCH

TDP

ART.DE

MENAJE

6%

DEPOSITO ALMACEN

COCINA

6%

COMEDOR

0 2.1 0 0 1.5 0.6 -1 VV

AREA DE DIGESTION

DE LABORATORIO

2.10 0.60 1.50 VV-1

DOCUMENTACION

NPT 38.80

0.60 2.10 VV-1 1.50

AREA DE INGENIERIA

CO

INGRESO

LABORATORIO ANALISIS DE BACTERIOLOGICO

DAMAS

0.60 2.10 VV-1 1.50

AREA DE INGENIERIA DEPOSITO REACTIVOS

SS.HH.

0.60 VV-1

AREA DE INGENIERIA

ALMACEN

2.10 1.50

SS.HH. VARONES

AREA DE LAVADO

JARDIN

SALA DE REUNIONES

Related Documents

Plano 01.pdf
October 2019 18
Programa-clave
May 2020 5
Clave Dicotomica
June 2020 4
Plano
April 2020 31

More Documents from ""

June 2020 21
October 2019 53
Sewer Cad
May 2020 23