Carbon Track Crankset Service Instructions
Revision Date 13-Jan-09
www.fullspeedahead.com
ZS055-v0
Page 1 of 3
Service Instructions Congratulations on your Full Speed Ahead product. Please read these instructions and follow them for correct use. Since specific tools and experience are necessary for proper installation, it is recommended that the crankset be installed by a qualified bicycle technician. These instructions and instructions for other FSA products are available for download at http://www.fullspeedahead.com/techdoc
Specification
Item Number / Model Name CK-816C/IS-TKA / Carbon Track
Crankset
Components
Follow the assembly order in the illustration: ⓞ Bottom Bracket Shell ③ M15 Crank Bolts x1 ① Right BB Cup x1
④ Main Body
② Left BB Cup x1 Contact If you have questions, please visit our web site contact page at : http://www.fullspeedahead.com/contact
Warranty Revision Date 13-Jan-09
www.fullspeedahead.com
ZS055-v0
Page 2 of 3
Full Speed Ahead (FSA) warrants all FSA, Gravity, Vision and RPM products
Crankset installation
1. 2. 3.
Ensure that Bottom Bracket (BB) shell ⓞ is clean and free of metal chips, dirt and excess paint. Follow assembly order pictured above. Pre-install the R. BB cup ①, and spindle Main body ④, half way. Pre-install the L. BB cup ② half way. Repeat the step 2, tightening the R. BB cup ① ensuring it is parallel to the surface of BB shell. Then tighten the L. BB cup ②. Note: Ensure main body aligns directly inside of left cup during tightening.
4. 5.
Install right crank arm by precisely engaging the spindle hole of crank to BB spindle. Tighten M15 crank bolt ③ to 410-610 kgf.cm / 40-60 Nm / 350-530 in.lbs. Install the left crank arm. Tighten M15 bolt ③ to 410-610 kgf.cm / 40-60 Nm / 350-530 in.lbs Note: If alloy M15 crank bolts are used: First, install crank arms with steel M15 crank bolts to recommended torque. Then remove steel bolt and install alloy bolt instead.
6.
Adjust the the Left / Right BB cups accordingly (one thread equals 0.8mm-1mm) to adjust to the required chain line.
Full Speed Ahead, USA 12810 NE 178th St. Suite 102 Woodinville, WA 98072 Tel: 1_425_488_8653 Fax: 1_425_489_1082
Revision Date 13-Jan-09
www.fullspeedahead.com
Full Speed Ahead, Europe Via Del Lavoro, 56 20040 Busnago, Milan, ltaly Tel: +39_039_688_5265 Fax: +39_039_682_3336
ZS055-v0
TH INDUSTRIES / FSA Asia 487 Ko-Chung Rd. Ta-Li City 412 Taichung County, Taiwan Tel: +886_4_2406_8641 Fax: +886_4_2406_8076
Page 3 of 3