Zs055-carbon Track Crankset (english-20090113) V0

  • Uploaded by: manuel
  • 0
  • 0
  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Zs055-carbon Track Crankset (english-20090113) V0 as PDF for free.

More details

  • Words: 395
  • Pages: 3
Carbon Track Crankset Service Instructions

Revision Date 13-Jan-09

www.fullspeedahead.com

ZS055-v0

Page 1 of 3

Service Instructions Congratulations on your Full Speed Ahead product. Please read these instructions and follow them for correct use. Since specific tools and experience are necessary for proper installation, it is recommended that the crankset be installed by a qualified bicycle technician. These instructions and instructions for other FSA products are available for download at http://www.fullspeedahead.com/techdoc

Specification

Item Number / Model Name CK-816C/IS-TKA / Carbon Track

Crankset

Components

Follow the assembly order in the illustration: ⓞ Bottom Bracket Shell ③ M15 Crank Bolts x1 ① Right BB Cup x1

④ Main Body

② Left BB Cup x1 Contact If you have questions, please visit our web site contact page at : http://www.fullspeedahead.com/contact

Warranty Revision Date 13-Jan-09

www.fullspeedahead.com

ZS055-v0

Page 2 of 3

Full Speed Ahead (FSA) warrants all FSA, Gravity, Vision and RPM products

Crankset installation

1. 2. 3.

Ensure that Bottom Bracket (BB) shell ⓞ is clean and free of metal chips, dirt and excess paint. Follow assembly order pictured above. Pre-install the R. BB cup ①, and spindle Main body ④, half way. Pre-install the L. BB cup ② half way. Repeat the step 2, tightening the R. BB cup ① ensuring it is parallel to the surface of BB shell. Then tighten the L. BB cup ②. Note: Ensure main body aligns directly inside of left cup during tightening.

4. 5.

Install right crank arm by precisely engaging the spindle hole of crank to BB spindle. Tighten M15 crank bolt ③ to 410-610 kgf.cm / 40-60 Nm / 350-530 in.lbs. Install the left crank arm. Tighten M15 bolt ③ to 410-610 kgf.cm / 40-60 Nm / 350-530 in.lbs Note: If alloy M15 crank bolts are used: First, install crank arms with steel M15 crank bolts to recommended torque. Then remove steel bolt and install alloy bolt instead.

6.

Adjust the the Left / Right BB cups accordingly (one thread equals 0.8mm-1mm) to adjust to the required chain line.

Full Speed Ahead, USA 12810 NE 178th St. Suite 102 Woodinville, WA 98072 Tel: 1_425_488_8653 Fax: 1_425_489_1082

Revision Date 13-Jan-09

www.fullspeedahead.com

Full Speed Ahead, Europe Via Del Lavoro, 56 20040 Busnago, Milan, ltaly Tel: +39_039_688_5265 Fax: +39_039_682_3336

ZS055-v0

TH INDUSTRIES / FSA Asia 487 Ko-Chung Rd. Ta-Li City 412 Taichung County, Taiwan Tel: +886_4_2406_8641 Fax: +886_4_2406_8076

Page 3 of 3

Related Documents


More Documents from "manuel"