Wat Dam 6b

  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Wat Dam 6b as PDF for free.

More details

  • Words: 283
  • Pages: 1
FAX: 0091-0870 – 2459547 Telegrams: ‘NITWGL’ Website: www.nitw.ac.in

Phones: 2459191, 192,193 2459544,545,548( PBX 7 lines)

NATIONAL INSTITUTE OF TECHNOLOGY WARANGAL – 506004 (A.P), INDIA

Lr. No: NITW/CED/SD/SRIC From Dr. N V Umamahesh Professor & Head Department of Civil Engineering

Dt: 03.08.2009 To The Project Officer RG, OCP – III M/s SCC Ltd; Ramagundam Area II.

Dear Sir Sub: Construction of Water dams at 6B incline- Third party Inspection – Reg; Ref: RG2/CVL/7D/6B WD/1705 dated 23.07.2009. Thank you very much for the letter referred above, requiring NITW to carryout Third party quality check of materials related to Construction of water dams. With reference the letter cited above, the Department of Civil Engineering, NIT Warangal can provide the following service. 1. Assessing the Quality of Concreting work. 2. Reporting and guidance on quality improvement. 3. Technical advice, comments on quality of concrete construction materials and quality of workmanship of Concrete construction. 4. Visit to the construction site on suitable convenient dates. The consultancy charges are as follows: S. No 1. 2. 3. 4.

Charges per Visit

Details

Rs. 20, 277 ( including all taxes) Rs. 35,485 ( including all taxes) TA + Hospitality Quality Tests (If required)

Consultation on Surface Consultation in the mine To be arranged by M/s SCCL Charged extra if done at NITW as per institution norms or client organization will get the quality tests as recommended, done through suitable agency.

Mode of Payment: The consultancy charges shall be paid in advance through DD drawn in favour of Director, NIT, Warangal. I am sure that the interaction between your department and NITW will help improve the quality of infrastructure works taken up by your department. Thanking you. Yours Sincerely (N V Umamahesh)

Related Documents

Wat Dam 6b
July 2020 0
6b
April 2020 34
6b
April 2020 32
6b
April 2020 38
6b
November 2019 46
6b
April 2020 37