WASTE MANAGEMENT IN WESTERN MACEDONIA

Presentation by: Periklis Kafasis Head, Dept. of Programming & Project Development

Responsible body for Waste Management:

DIADYMA SA

Company was founded in 1998

Shareholders: - Municipalities of Grevena, Kastoria, Florina, Kozani & Ptolemaida - The Local Unions of the municipalities of the four prefectures of the region

Main activities: Mechanical Collection Transferring Recovery and Recycling Mechanical Treatment and Recovery Sanitary Landfilling Landfill restoration

WASTE TRANSFERING SYSTEM Florina

Amindeo The IWMS of W. Macedonia includes the Central Facilities of Integrated Waste Management which is supplied by 10 Local Waste Management Facilities (LWMF). Mixed waste is being transported and also recyclable materials, to serve the needs of the local collection system. That integrated system serves the needs of 61 municipalities of W. Macedonia and 300.000 residents.

Kastoria

Ptolemaida CFIWM Kozani

Tsotyli Siatista

Servia

Grevena Deskati

Each month the Local Waste Management Facility (LWMF) network of W. Macedonia…

receives 2,500 truckloads… more than 10,000 tonnes of urban waste are being transferred…

The Central Facilities of Integrated Waste Managemt

(1) The Landfill’s 2 cells (2) The leachate monitoring system (3) The biogas monitoring system (4) Other facilities (administration building, maintenance building etc)

Landfill restoration

Dump restoration works were completed in mid 2007. Environmental inspections and risk assessment studies for more than 200 sites were conducted and also technical studies for all high risk dumps. Funding was provided by the EU for restoration works in 40 sites,

Restoration works for all high-risk dumps have been completed in mid2007. Total cost have reached € 9m.

40 high risk dumpsites 91 restored low risk dumpsites 76 low risk dumpsites

The Mechanical and Biological Treatment

DIADYMA SA is moving towards the construction of infrastructures for waste treatment and development.

The MTP has a capacity of 150.000 tones, and it will maximize the recovery of recyclables, doubling the landfills’ lifecycle.

Integrated Waste Management in W. Macedonia through Private-Public Partnership (PPP) Development Program of THESEUS

28/11/2006 Contract sign with the Advisor to support DIADYMA in means of PPP for Integrated Waste Management System (IWMS) Budget 225,000 € Four scenarios

1) Mechanical sorting, production of compost and RDF 2) Biological drying 3) Mechanical and biological treatment (anaerobic digestion) 4) Mass-fired burning & energy production

Integrated Waste Management in W. Macedonia through Private-Public Partnership (PPP)

In cooperation with the Special Secretariat for PPPs, DIADYMA SA deposited a complete file to the Ministry of Economy in March 2007, taking a decisive step towards the implementation of the first Integrated Regional Waste Management System in Greece through the process of Public Private Partnership. In August 2007, the Interministerial Commission for PPPs, approved the implementation of the project to the provisions of the PPPs law and in March 2009 the contract with the Technical Advisor was signed. The Advisor in direct cooperation with DIADYMA will prepare the action issues for the selection of the Private Partner

Integrated Waste Management in W. Macedonia through Private-Public Partnership (PPP) Project’s Time-schedule

Stage A: Contract notice (Pre-selection – Phase A) => June 2009 Stage B: Pre-selection and Preparation of Phase B Stage C: Phase B => January 2010 Stage D: Tender=> May 2010 Stage E: Enhancement of Private Concessionaire => July 2010 Stage F: Construction => June 2012

Integrated Waste Management in W. Macedonia through Private-Public Partnership (PPP) Project’s general information and targets Budget 250m € (Co-funding-116m€ from the State – 134m€ from the beneficiaries) Time-schedule 25 years Reduction of the quantities of waste that go into the landfill Minimisation of environmental impact through the treatment of the waste biodegradable fraction Production of materials and energy that lead to financial benefits In 2010, the biodegradable waste that will be diverted form the Landfill will be more than 24.137 tones, in 2013 more than 40.030 tones and in 2020 more than 55.305 tones The Project creates new standards for waste management across the country

Local Waste Management Facilities turn into “Green points”

maximizing recovery rates becomes the main target of the regional IWMS of W. Macedonia

2.500 tonnes of paper are transported annually

ALTERNATIVE MANAGEMENT OF SPECIFIC WASTE

Packaging materials Electrical and electronic waste Car batteries & tires Used mineral oils Bulky waste and debris

Western Macedonia Development of Innovation in the Field of Solid Waste Management in Western Macedonia

Patrners: Germany-Spain-Greece SMART I: Former mining sites and industrial heritage: Recovery and Redevelopment SMART II: NatuReshaping Landscape

Partners: Italy-Morocco-Greece Waste Management on Mountainous Regions

Partners: Italy-Spain-Greece Countryside and Landscape: Opportunities from Renewable Energies

Partners: Greece - FYROM Recycling and Material recovery: Regional Environmental Management capacity and infrastructure

European Programs

Thank you for your attention