UEM Tech Wall

548 UNITS OF GOVERNMENT APARTMENTS AT PARCEL 17RM4, PRECINCT 17, PUTRAJAYA WILAYAH PERSEKUTUAN

IBS KNOWLEDGE SHARING

UEM Tech Wall

CONTENT     

SCOPE OF WORK FACTORY FACILITIES PRODUCTION PROCESS DELIVERY MOCK UP UNIT

UEM Tech Wall

SCOPE OF WORK 

SUPPLY AND DELIVER NON-STRUCTURAL WALL (FACADE WALL) TO SITE 

TEN (10) TYPES: 1. WALL 01 SERIES 2. WALL 02 SERIES 3. WALL 03 SERIES 4. WALL 04 SERIES 5. WALL 05 SERIES 6. WALL 06 SERIES 7. WALL 08 SERIES 8. WALL 22 SERIES 9. AIR-COND LEDGE 10.WINDOW HOOD

UEM Tech Wall

WALL 01 SERIES    

WALL WALL WALL WALL

PANEL PANEL PANEL PANEL

01 1A 1A1 1A1d

UEM Tech Wall

WALL 02 SERIES  

WALL PANEL 2A WALL PANEL 2B

UEM Tech Wall

WALL 03 SERIES 

WALL PANEL 3A

UEM Tech Wall

WALL 04 SERIES    

WALL WALL WALL WALL

PANEL PANEL PANEL PANEL

4A 4A1 4A2 4B

UEM Tech Wall

WALL 05 SERIES     

WALL WALL WALL WALL WALL

PANEL PANEL PANEL PANEL PANEL

5A 5B 5C 5D 5E

UEM Tech Wall

WALL 06 SERIES       

WALL WALL WALL WALL WALL WALL WALL

PANEL PANEL PANEL PANEL PANEL PANEL PANEL

6 6A2 6A3 6A4 6A5 6A6 6A7

UEM Tech Wall

WALL 08 SERIES  

WALL PANEL 8A WALL PANEL 8B

UEM Tech Wall

WALL 22 SERIES  

WALL PANEL 22 WALL PANEL 22A

UEM Tech Wall

AIR CONDITION LEDGE  

PRECAST ELEMENT AC1 PRECAST ELEMENT AC2

UEM Tech Wall

WINDOW HOOD  

PRECAST ELEMENT C30 PRECAST ELEMENT C31

UEM Tech Wall

FACTORY FACILITIES   



FACTORY FLOOR BATCHING PLANT COMPACTION USING TABLE VIBRATION SYSTEM GANTRY CRANES

factory and batching plant

dedicated factory floor

table vibration system

UEM Tech Wall

PRODUCTION PROCESS     

MOULD PREPARATION REINFORCEMENT PREPARATION QA/QC CHECK CONCRETING PROCESS YARDING

UEM Tech Wall

MOULD PREPARATION

spraying water-based mould oil onto the mould cleaning of mould

cleaning of formwork with the water-based mould oil evenly

UEM Tech Wall

REINFORCEMENT PREPARATION

placing and tying of reinforcement into the mould

checking of reinforcement

UEM Tech Wall

QA / QC MANAGEMENT

QA & QC LABORATORY

preparing for concrete cube samples compression machine to test concrete cube strength

UEM Tech Wall

CONCRETING PROCESS

discharging of concrete from casting hopper

spreading of concrete

concreting in progress

dismantling of form vibrator completion of compaction

trowel finishing

trowel of concrete

formwork striking

UEM Tech Wall

YARDING

transferring of panel to storage yard

temporary stacking of panels

racking of panels

turning of panel

stacking of panels

UEM Tech Wall

DELIVERY

loading of panels in factory

arrival of panels at site

unloading of panels at site

arrival at project site

unloading of panels at site

erection of panels at site

assembly of window hood at site

UEM Tech Wall

MOCK-UP UNIT IN FACTORY

FOUNDATION LAYOUT

MOCK UP UNIT PANEL LAYOUT

MOCK UP UNIT LAYOUT IN 3D VIEW

concreting of ground floor installation of panel

marking prior to installation shim plate for leveling

verticality check

propping of panel

front view

side view

rear view

hall & living room bedroom 1 & 2

installation of electrical conduits

installation of sanitary pipes

UEM Tech Wall

THANK YOU

Related Documents

Uem Litetechs
May 2020 7
Uem Examenesopticafisica
October 2019 13
Mo____o Uem
May 2020 12
Uel E Uem Livros
June 2020 13
Uem Update Newsletter
December 2019 13

More Documents from ""